Cities Index.
CCO 051 - Modify Electrical Brundage.pdf

Bakersfield City Council
January 22, 2025

Document
CCO 051 - Modify Electrical Brundage.pdf
Meeting
January 22, 2025
Body
Bakersfield City Council
Original file
1.6 MB
Text extracted from the city's file for reading and search. Open the original on pub-bakersfield.escribemeetings.com. That file is the official record.

CITY OF BAKERSFIELD
Thomas Roads Improvement Program
SHEET 1 OF 5
CONTRACT NO. P.O. NO.

PROJECT:

FEDERAL NO. (S)
CONTRACTOR: Security Paving Company
ADDRESS: 2915 Fairhaven Drive
Bakersfield, CA 93309

YOU ARE HEREBY DIRECTED TO MAKE THE HEREIN DESCRIBED CHANGES FROM THE PLANS AND SPECIFICATIONS OR DO THE FOLLOWING WORK DESCRIBED NOT INCLUDED IN THE PLANS AND SPECIFICATIONS ON THIS CONTRACT.

NOTE: This change order is not effective until approved by City Council or City Engineer CHANGE SUBMITTED BY: Arturo Infante, Construction Manager DATE: 1/3/2025 CHANGE REQUESTED BY: Arturo Infante, Construction Manager DATE: 1/3/2025

ACCOUNT NO (S) 122-4021-825.80-41 TRCC21
127-4021-825.80-41 TRCC21 INCREASE $0.00
335-4021-825.80-41 TRCC21 DECREASE ($11,262.29)
By reason of this order the time of City Council Approval Required YES X completion will be adjusted as follows: NO

CONTRACT CHANGE ORDER
Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work of contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 19-069 51
NCIIPL-5109(251)
CHANGE ORDER NO.

Centennial Corridor MAINLINE

NO ADJUSTMENT
As authorized by the Engineer, and in accordance with section 4-1.05 "Changes and Extra Work", and as shown on sheets 3 through 5 of this change order, modifiy the work related to Item #261, "Signal and Street Lighting" on SR58 and Brundage Lane as follows:

Adjustment of Compensation at Lump Sum Price:

Delete 1 EA PPBA - Pole D
Delete 2 EA 165WLED Fixtures
Delete 2 EA 15' Mast Arms
Delete 2 EA signs R9-3
Delete 1,350' of 3 Conductor Cable
Delete 1 EA Remove Existing Signal Pole
For the work of this change, the Contractor shall credit the City a lump sum of $15,022.51. This sum constitues full compensation, including all markups, for this change.

Adjustment in Compensation: -$15,022.51
Adjustment of Compensation at Lump Sum Price:

After the following material has been delivered to the City of Bakersfield, the Contractor shall be compensated a lump sum of $3,497.77. 1 EA PPBA - Pole D
2 EA 165WLED Fixtures
2 EA 15' Mast Arms
Adjustment in Compensation: $3,497.77
Extra Work at Agreed Lump Sum Price:

As shown on sheets 3 through 5 of this change order:

Install 25' of 3" conduit
Install 15' of Conductor #6
Install 50' of Conductor #8
Install 160' of 5 Conductor Cable
Extra Work at Lump Sum
: $262.45
TIME ADJUSTMENT:

NO ADJUSTMENT
Approved As to Form: CITY ATTORNEY Approved by the Council of City of Bakersfield Approval Recommended: City Engineer Mayor
Countersigned: Finance Director Date
Contractor: Title:Accepted, Date:

We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above.

Contract No. PW19-069
Change Order No. 51
Sheet 2 of 5

UNILATERAL
ASPH
310 3151 2 3 4
Ker06
BAKERSFIELD, CALIFORNIA 93301
1600 TRUXTUN AVENUE

CITY OF BAKERSFIELD

ELECTRICAL

REGISTERED ELECTRICAL ENGINEER
PASADENA, CALIFORNIA 91124
100 WEST WALNUT STREET

PARSONS

MATTHEW BRASH
x
x
x
x
x
Dist COUNTY ROUTE POST MILES

TOTAL PROJECT
SHEET
No.

TOTAL
SHEETS

LAST REVISION

STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
No.

Exp.

R
E
G
I
S
T
E
R
E
D

PROFESSIONAL
E
N
G
I
N
E
E
R

STATE OF CALIFORNIA

TIME PLOTTED =>
DATE PLOTTED =>
$TIME
$DATE

CHECKED BY

DESIGNED BY

CALCULATED- REVISED BY

DATE REVISED

PLANS APPROVAL DATE
DATE

CONSULTANT FUNCTIONAL SUPERVISOR
R
COPIES OF THIS PLAN SHEET.

THE ACCURACY OR COMPLETENESS OF SCANNED

OR AGENTS SHALL NOT BE RESPONSIBLE FOR

THE STATE OF CALIFORNIA OR ITS OFFICERS
R
03-09-18
USERNAME => $USER
DGN FILE => $REQUEST

RELATIVE BORDER SCALE

IS IN INCHES
0 1 2 3
UNIT 1477 PROJECT NUMBER & PHASE 0600000484BORDER LAST REVISED 7/2/2010 99 58

22.7/23.8
R50.5/R55.5

DALE WILSON

MARIAM HABBOUSH
WILSON
DALE J.
13750
06/30/19
1464
10/10/18
10/10/18
310 3151 2 3 49

BRUNDAGE
AT
SR-58 WB RAMPS

BRUNDAGE LN
S
R
-
58 W
B

O
FF

R
A
M
P
S
R
-
58 W
B

ON

R
A
M
P

ST EA D Y DEMA N D SEQ UENCE
O1
O6
O2
O2P
O7
6' 6' 6'26' 10'

L EFT TURN LO OP DE T ECTORS DE TAIL

PHASE DIAGRAM
R
E
C
Y
C
LE

YA
R
D

D
R
IV
E
W
AY

NO SCALE
O5
OR
O5
O1 O6
O2
O8
C
R
O
SS

W
A
L
K
140
' T
O

O5
O2
O2P
O7
O7
O2P
O1
O6
O6
O8
O8

LIMIT LINE
285' TO

LIMIT LINE
285' TO
NOTES:

OFFICE.

RIG HT OF WAY EN GINE ERING AT THE DISTRICT
FOR AC CURATE RIG HT OF WA Y DATA, CO NTACT1.

SE E SHEET E-6 1
CONDUIT NOTES:
2I2L 2I4U
2I4L
5J1U
6J4L
6J4U
1I1U
8 J
7 U
8 J
7 L
7 J
9 L
O8
AB
20 '
6J2L

SEE DETAIL 'A'
PG&E
SP
AB

NO SCALE

DETAIL 'A'
GLA{
1 8
'

SEE DETAIL 'A'

SIMULTANEOUS
RS
R
Y
G
C
E
F
A
8J6L
2"C, 1-DLC
2"C, 1-DLC
2"C, 1-DLC
E
V
B
EVA
EVC
E
VUD
R61-7(CA)
3 2
2 1
4 4
4 4
2I3U
{
5J9U
{
1I9U
6J3U
GO8
O2
O7
8 J
8 L
8 J
8 U
7 7
5 6
O2
O2P
O6
AB
6 9
O6O5

2. OTHERWISE NOT ED.

AL L PULL BOXES MUST BE No. 5(TR) (E) U NL ES S
O1
O2
2"C, 1-DLC
10 B
RC
RC
2 6
6 6E
6 6
6 3"C, PT
3 4
5 6
7 8
9 3"C, 2# 6 (SIG N AL), 2 #8 (Ltg)
SE E SHE E T E-6 1
LEGEND:
2 11
E-60
SCALE: 1" = 20'
LOCATION 4 (SHEET 1 OF 2) SIGNAL AND LIGHTING SYSTEM
1-DLC
2"C,
12 13
R9-3
7 R9-3
R9-3
7 R9-3
703
7 R9-3
1 MH
07/07/21
1 1
1 2
14 14CBSC
51 3
5 02
06 08
PHASE

DETECTORS-DLC
SMA LMA 0
A
No.

C
F
12CSC

VEH-PED
1 3 4 6
PHASE

CABLE SCHEDULE
TYPE
CABLE
D
T
S
A
B
C
TOTAL

LIGHTING

AND SIZE

CONDUIT RUN NUMBER
#8

MESSAGE

PLACEMENTRSNS
ARROWType

STANDARD MASTARMS SIGNAL MOUNTING

MAST ARM POLE PED

LUMINAIRE
CONDUCTOR AND CONDUIT SCHEDULE (SHEETS E-60 AND E-61 ONLY) (N) (N) (N) (N)
01 #6
RSNS = REFL ECTIVE STRE E T N AME SIG N
POLE SCHEDULE (SHEETS E-60 AND E-61 ONLY)

REQUIREMENTS

SPECIAL

STATION
A OR
OFFSET
B OR
5 (N)
RW1 LED

APS PBA
1 (E) = EXISTING CONDUIT RUN (N) = NEW CONDUIT
3CSC
PBA

BRUNDAGE LN
AT
SR-58 WB RAMPS
1 2
3 4
DETAIL 'U' ES-7N REQUIRED.

SEE DETAIL B RSP ES-4E.
02 ADV
06 ADV
08 ADV
GROUND
EVC
1 1 1 1 1
3 10
1 2
0 05
2 1
3 07
4 -
2 -
1 4
1 6 6 0 56
4" 4" 4" 3-4"
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
--
-
INSTALL COUNTDOWN PED SIGNAL HEADS.
5 6
7 STRAP AND SADDLE SIGN TO SIGNAL POLE.

AMPERES VOLTS POLES METER

CONTROL TYPE

PHOTOELECTRIC
100
50 240
120
2 1

NAME PLATE

SERVICE DISCONNECT YES
YES
-

AMPERES VOLTS POLES METER

CONTROL TYPE

PHOTOELECTRIC
100
30 15
240
240
120
2 2
1 NAME PLATE

SERVICE DISCONNECT

LIGHTING

LTG CONTROL
YES
YES
YES
-
-

TRAFFIC SIGNAL -
E
F
02PBA
02PBA
Á8
VCS - - - 1
2 0
3 E
B
8 STATION AND OFFSET TAKEN FROM BRUNDAGE LN ALIGNMENT.
8 (07)
VCHS = VIDEO CABLE HARNESS
9 10 FURNISH AND INSTALL WIRELESS ANTENNA AND MODEM.

IV
11 INSTALL PG&E PULL BOX PER PG&E REQUIREMENTS.
7 (N)
3 1
-
-
-
-
-
-
-
-
-
6 G
G
Á7
Á1,Á2,Á2P
1 1
2 8
2 8
8 (N)
9 (N)
1 1 1
1 1 1
1 2 2 2
1 1 1 1
2 2 2 2 2
1 1
1 1
1 1
1 1
222 -
1 1
-
11- -
1 1 1----
44- - -
- -
1 1 1 1-
-3 3 3 3
2--
-
3 3--
-2 2 2 2
- -
-
TOTAL
FILL %

CONDUIT SIZE
16% 15% 25% 18% 19% 16% 16%
1817
1 2 2 1 1 2 4 4
363514 1614 7129
3-4"4" 3"
#6 SIGNAL 2 2 2-----
-
-
55'
2-MAS
2 6-4-1 0 0
S P-1-T
SV-2-TB45'
35'
2 B RU N D A GE LN
-
TV-1-T
3 1 1+7 5.5 8 79.03
3 1 1+5 0.9 8 57.14
3 1 1+7 0.6 2 49.62
3 1 2+8 1.3 9 49.62
3 1 3+0 8.7 8 57.23
LMA 90° OFFSET TO SMASV-2-T
-

78.70 TV-2-T
3 1 2+8 4.6 9-
55'
15'
15'
15'
15'
-
-
165W
165W
165W
165W
-
-
2-MAS
2-MAS
2-MAS
-
-
-
SV-2-T
S P-1-T
-
2 -
-
-
-
-
-
2 6-4-1 0 0
2 9-5-1 0 0
2 9-5-1 0 0
1-A (1 0')
1-A (1 0')
APS 1- -
Á2,Á5,Á2P,Á7

TOTAL DLC & VCS
LEGEND (FOR E-60 AND FOR THIS SHEET ONLY):

INSTALL INDUCTIVE LOOP DETECTORS.
2-3"
E-61
SIGNAL AND LIGHTING SYSTEMLOCATION 4 (SHEET 2 OF 2)
-
-
-
-
-
12 13 INSTALL VIDEO IMAGE PROCESSOR UNIT.

INSTALL AS DIRECTED BY THE ENGINEER
2070E CONTROLLER AND BBS CABINET. FURNISH C11 WIRE HARNESS AND INSTALL DEPARTMENT-FURNISHED 332L CONTROLLER CABINET WITH INSTALL VIDEO IMAGE DETECTOR SENSOR UNIT ON SIGNAL MAST ARM.

CTID No: 06500580055495M
ADDRESS: 1622 BRUNDAGE LANE
ENCLOSURE, WITH THE FOLLOWING CIRCUIT BREAKERS;
120/240V, 3 WIRE, TYPE III-CF SERVICE EQUIPMENT
CTID No: 06500580055495M
0 3
5CSC
INSTALL TYPE PG&E (RULE 16) SERVICE.

INSTALL 3 POINT LATCH HANDLE AND LOCK OVER, SEE DETAIL D ON SHEET ED-38 704
- 1 1 2 2
1 M
H
07 /
07 /
21 -
- - -
- --
8%
Á1,Á6,Á8
Á5,Á8
2 (N)
-
1 2
3 2"
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6%
1 1
1 1
1 1
1 14 EXISTING LUMINAIRE TO REMAIN; PROTECT IN PLACE.

Ker06
BAKERSFIELD, CALIFORNIA 93301
1600 TRUXTUN AVENUE

CITY OF BAKERSFIELD

ELECTRICAL

REGISTERED ELECTRICAL ENGINEER
PASADENA, CALIFORNIA 91124
100 WEST WALNUT STREET

PARSONS

MATTHEW BRASH
x
x
x
x
x
Dist COUNTY ROUTE POST MILES

TOTAL PROJECT
SHEET
No.

TOTAL
SHEETS

LAST REVISION

STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
No.

Exp.

R
E
G
I
S
T
E
R
E
D

PROFESSIONAL
E
N
G
I
N
E
E
R

STATE OF CALIFORNIA

TIME PLOTTED =>
DATE PLOTTED =>
3:20:17 PM
7/9/2021

CHECKED BY

DESIGNED BY

CALCULATED- REVISED BY

DATE REVISED

PLANS APPROVAL DATE
DATE

CONSULTANT FUNCTIONAL SUPERVISOR
R
COPIES OF THIS PLAN SHEET.

THE ACCURACY OR COMPLETENESS OF SCANNED

OR AGENTS SHALL NOT BE RESPONSIBLE FOR

THE STATE OF CALIFORNIA OR ITS OFFICERS
R
03-09-18
USERNAME => p002502C
DGN FILE => 0600000001ua061_R1.dgn

RELATIVE BORDER SCALE

IS IN INCHES
0 1 2 3
UNIT 1477 PROJECT NUMBER & PHASE 0600000484BORDER LAST REVISED 7/2/2010 99 58

22.7/23.8
R50.5/R55.5

DALE WILSON

MARIAM HABBOUSH
WILSON
DALE J.
13750
06/30/19
1464
10/10/18
10/10/18
51 4
5 ELECTRICAL QUANTITIES

NO SCALE
EQ-3
TO DETERMINE ALL MATERIALS NEEDED FOR EACH SYSTEM.

COMPONENTS. SEE ELECTRICAL SYSTEMS PLANS AND SPECIFICATIONS

ELECTRICAL SYSTEMS QUANTITIY TABELS SUMMARIZE SIGNIFICANT NOTE:

FA
753

SIGNAL AND LIGHTING SYSTEM

REMOVING EXISTING ELECTRICAL SYSTEM
SHEET No.

SIGNS
REMOVE TYPE 9 FB AND
POLE
REMOVE TYPE 1-A SIGNAL
POLE
REMOVE TYPE 15 SIGNAL
POLE
REMOVE TYPE 16 SIGNAL
POLE
REMOVE TYPE 17 SIGNAL
POLE
REMOVE TYPE 19 SIGNAL
POLE
REMOVE TYPE 26 SIGNAL

SERVICE

REMOVE TYPE III-AF
BBS

CONTROL ASSEMBLY AND
REMOVE MODEL 170

RS MAGNETIC DETECTORS

RS MVDS EQUIPMENT
EA
E-62 2 0 0 0 0 0 0 0 0 0 0 3
E-63 2 0 3 0 0 0 0 1 0 0 1 2
E-64 0 1 2 0 0 3 0 1 1 7 0 7
E-65 0 0 1 0 1 1 1 0 1 2 0 7
3"C, TYPE 3
No. 6 CONDUCTOR
No. 8 CONDUCTOR
CAT5E CABLE
(PUSH BUTTON ASSEMBLY)
(CSC)
3 CONDUCTOR SIGNAL CABLE
(APS CABLE)
(CSC)
5 CONDUCTOR SIGNAL CABLE
(VEHICLE-PEDESTRIAN)

CABLE (CSC)
12 CONDUCTOR SIGNAL
(DLC)

DETECTOR LEAD IN CABLE

EVUD CABLE
12' PR #19 SIC
LF
105 0 0 0 0 0 345 35 1405 4920 1080 20
0 0 0 0 0 0 995 45 0 0 0 0
0 350 425 320 1110 560 2855 150 2980 4935 0 0
SHEET No.

E-53
E-55
E-57 & E-58
2"C, TYPE 3
4"C, TYPE 3
SIGNAL AND LIGHTING SYSTEM (2 OF 2)

MODIFYING EXISTING ELECTICAL SYSTEM
SIGNAL AND LIGHTING SYSTEM (1 OF 2)

MODIFYING EXISTING ELECTICAL SYSTEM
No. 5(TR)(E) PB
No. 6(TR)(E) PB
POLE)
TYPE 1-A (6') (SIGNAL

POLE) FOUNDATION
TYPE 1-A (6') (SIGNAL
POLE)
TYPE 1-A (10') (SIGNAL

FOUNDATION
TYPE 1-A (SIGNAL POLE)
POLE)
TYPE 19-3-100 (SIGNAL

POLE) FOUNDATION
TYPE 19-3-100 (SIGNAL

SIGNAL)
TYPE 26-1-100 (TRAFFIC

SIGNAL) FOUNDATION
TYPE 26-1-100 (TRAFFIC

SIGNAL)
TYPE 26-4-100 (TRAFFIC

SIGNAL) FOUNDATION
TYPE 26-4-100 (TRAFFIC

SIGNAL)
TYPE 29-5-100 (TRAFFIC

SIGNAL) FOUNDATION
TYPE 29-5-100 (TRAFFIC
LUMINAIRE MAST ARM (12')
LUMINAIRE MAST ARM (15')
SIGNAL MAST ARM (35')
SIGNAL MAST ARM (40')
SIGNAL MAST ARM (45')
SIGNAL MAST ARM (50')
SIGNAL MAST ARM (25')

ASSEMBLY (PBA)

SIGNAL (APS) PUSH BUTTON

ACCESSIBLE PEDESTRIAN

CABINET
FURNISHED MODEL 332

INSTALL DEPARTMENT

FOUNDATION
MODEL 332 CABINET

CONTROLLER ASSEMBLY
FURNISHED 2070E

INSTALL DEPARTMENT

CABINET

BATTERY BACKUP SYSTEM
165W LED LUMINAIRE
SIGN

REFLECTIVE STREET NAME

ETHERNET SWITCH

INDUCTIVE LOOP DETECTORS
SIGN R9-3A
SIGN R3-18
SIGN R61-13(CA)
EA
3 0 0 0 0 0 1 1 0 0 0 0 0 0 1 0 0 2 0 0 1 2 0 0 2 1 1 1 0 23 3 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 15 3 1 1 5 5 0 0 1 1 1 1 1 1 2 1 1 0 1 1 0 12 1 1 1 1 3 0 1 32 0 0 0 SHEET No.

E-53
E-55
E-57 & E-58
1 07/30/19
1 MH
07/30/19
1 MH
2 2 2 2 2 2
MH
07/07/21
2 MH
No. 5(TR)(E) PB
POLE)
TYPE 1-A (6') (SIGNAL

POLE) FOUNDATION
TYPE 1-A (6') (SIGNAL

PBA POST

SIGNAL)
TYPE 29-5-100 (TRAFFIC

SIGNAL) FOUNDATION
TYPE 29-5-100 (TRAFFIC
LUMINAIRE MAST ARM (15')
SIGNAL MAST ARM (35')
SIGNAL MAST ARM (45')
SIGNAL MAST ARM (55')

ASSEMBLY (PBA)

SIGNAL (APS) PUSH BUTTON

ACCESSIBLE PEDESTRIAN

CABINET
FURNISHED MODEL 332

INSTALL DEPARTMENT

FOUNDATION
MODEL 332 CABINET

CABINET

BATTERY BACKUP SYSTEM
165W LED LUMINAIRE
SIGN

REFLECTIVE STREET NAME
SIGN R9-3
SIGN R61-13(CA)
EA
12 2 2 - 2 2 2 1 1 1 4 1 1 1 2 1 6 1
SHEET No.

E-60
3"C, TYPE 3
No. 6 CONDUCTOR
No. 8 CONDUCTOR
(PUSH BUTTON ASSEMBLY)
(CSC)
3 CONDUCTOR SIGNAL CABLE
(APS CABLE)
(CSC)
5 CONDUCTOR SIGNAL CABLE
(VEHICLE-PEDESTRIAN)

CABLE (CSC)
12 CONDUCTOR SIGNAL
(DLC)

DETECTOR LEAD IN CABLE
EVC
LF
295 230 315 860 1160 170 210 2045 3470 930
2"C, TYPE 3
4"C, TYPE 3

SIGNAL)
TYPE 26-1-100 (TRAFFIC

SIGNAL) FOUNDATION
TYPE 26-1-100 (TRAFFIC
2 2
Ker06
BAKERSFIELD, CALIFORNIA 93301
1600 TRUXTUN AVENUE

CITY OF BAKERSFIELD

ELECTRICAL

REGISTERED ELECTRICAL ENGINEER
PASADENA, CALIFORNIA 91124
100 WEST WALNUT STREET

PARSONS

MATTHEW BRASH
x
x
x
x
x
Dist COUNTY ROUTE POST MILES

TOTAL PROJECT
SHEET
No.

TOTAL
SHEETS

LAST REVISION

STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
No.

Exp.

R
E
G
I
S
T
E
R
E
D

PROFESSIONAL
E
N
G
I
N
E
E
R

STATE OF CALIFORNIA

TIME PLOTTED =>
DATE PLOTTED =>
2:46:55 PM
7/9/2021

CHECKED BY

DESIGNED BY

CALCULATED- REVISED BY

DATE REVISED

PLANS APPROVAL DATE
DATE

CONSULTANT FUNCTIONAL SUPERVISOR
R
COPIES OF THIS PLAN SHEET.

THE ACCURACY OR COMPLETENESS OF SCANNED

OR AGENTS SHALL NOT BE RESPONSIBLE FOR

THE STATE OF CALIFORNIA OR ITS OFFICERS
R
03-09-18
USERNAME => p002502C
DGN FILE => 0600000001uc003.dgn

RELATIVE BORDER SCALE

IS IN INCHES
0 1 2 3
UNIT 1477 PROJECT NUMBER & PHASE 0600000484BORDER LAST REVISED 7/2/2010 99 58

22.7/23.8
R50.5/R55.5

DALE WILSON

MARIAM HABBOUSH
WILSON
DALE J.
13750
06/30/19
1464
10/10/18
10/10/18
51 5
5

← All documents from this meeting