CITY OF BAKERSFIELD
Thomas Roads Improvement Program
SHEET 1 OF 2
CONTRACT NO. P.O. NO.

PROJECT: Bakersfield Freeway Connector Project
FEDERAL NO. (S)
CONTRACTOR: Security Paving Company
ADDRESS: 2915 Fairhaven Drive
Bakersfield, CA 93309

YOU ARE HEREBY DIRECTED TO MAKE THE HEREIN DESCRIBED CHANGES FROM THE PLANS AND SPECIFICATIONS OR DO THE FOLLOWING WORK DESCRIBED NOT INCLUDED IN THE PLANS AND SPECIFICATIONS ON THIS CONTRACT.

NOTE: This change order is not effective until approved by City Council or City Engineer CHANGE SUBMITTED BY: Arturo Infante, Construction Manager DATE: 10/7/2022 CHANGE REQUESTED BY: Arturo Infante, Construction Manager DATE: 10/7/2022 ACCOUNT NO (S) 122-4021-825-8041 TRCC22 - (144)
126-4021-825-8041 TRCC22 - (245)
151-4021-825-8041 TRCC22 - (245) INCREASE $0.00
335-4021-825-8041 TRCC22 - (245) DECREASE $0.00
By reason of this order the time of City Council Approval Required YES completion will be adjusted as follows: NONE NO X
Approved As to Form: CITY ATTORNEY Approved by the Council of City of Bakersfield Approval Recommended: City Engineer Mayor
Countersigned: Finance Director Date
Contractor: Title:Accepted, Date:

We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above.

CONTRACT CHANGE ORDER
Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work of contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 18-176 71
PRNSL-5109(245)
CHANGE ORDER NO.

As authorized by the Engineer, and in accordance with section 4-1.05 "Changes and Extra Work" and as requested by the Contractor, from Station 81+19.00, "MI6" alignment, to Station 691+03.79, "SR99" alignment, stripe the Southbound off ramp at Ming Ave as shown on sheet two of this change order. After removal of the falsework system for Frame 1 of the N99-W58 connector for the Mainline project (Contract No. 19-069) the Contractor shall stripe the offramp as per the Pavement Delineation Plans.

NO COST, CHANGE IN PLANS:

TIME ADJUSTMENT:

There shall be no consideration of a time adjustment for the work on this change order. The time adjustment for this change order shall be 0 (zero) working days.

UNILATERAL
Ker06
BAKERSFIELD, CALIFORNIA 93301
1600 TRUXTUN AVENUE

CITY OF BAKERSFIELD

99 58

22.3/23.9
R52.2/R52.5

MATTHEW BRASH
PASADENA, CALIFORNIA 91124
100 WEST WALNUT STREET

PARSONS
x
x
x
x
x
Dist COUNTY ROUTE POST MILES

TOTAL PROJECT
SHEET
No.

TOTAL
SHEETS

LAST REVISION

STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
No.

Exp.

R
E
G
I
S
T
E
R
E
D

PROFESSIONAL
E
N
G
I
N
E
E
R

STATE OF CALIFORNIA

TIME PLOTTED =>
DATE PLOTTED =>
8:02:37 AM
9/14/2022

CHECKED BY

DESIGNED BY

CALCULATED- REVISED BY

DATE REVISED

PLANS APPROVAL DATE
DATE

CONSULTANT FUNCTIONAL SUPERVISOR
R
COPIES OF THIS PLAN SHEET.

THE ACCURACY OR COMPLETENESS OF SCANNED

OR AGENTS SHALL NOT BE RESPONSIBLE FOR

THE STATE OF CALIFORNIA OR ITS OFFICERS
R
04-10-18
USERNAME => p002317D
DGN FILE => 0600000001ma_SB99_220606_R1.dgn

RELATIVE BORDER SCALE

IS IN INCHES
0 1 2 3
UNIT 1477 PROJECT NUMBER & PHASE 0618000213BORDER LAST REVISED 7/2/2010 C83506
03/31/23
SPARKS

JEFFREY

REGISTERED CIVIL ENGINEER
CIVIL
685
05/04/18
05/04/18
M
I
S
C
.

P
O
S
T
8 9
9 685 6904 6 7 8 9 1
85 6
7 8
6 85
90 1
0 0
6 7
8 9
8 9
8 4
+
5 9
.2
3 E
C
8 C
O
N
C
ASPH
Ahd 27+92.05
Bk 579+33.86
85 2
3 4
7 675 6802 3 4 6 7 8 9 1 2 3 4
75 80
2 3
4 6 7 8
9 1
2 3
4 75
80 2
3 4
6 7
8 9
1 2 3 4
7 9
+
4 1
.9
4 B
C
P
I 7
2 +
2 0
.0
8 75
2 3 4
6 7
SCALE 1"=50'

TRAFFIC HANDLING PLAN

APPROVED FOR TRAFFIC HANDLING WORK ONLY
NOTES:

CL

NO SCALE

SECTION A-A
(STAGE 2.1)

SEE BELOW LEFT
MATCH LINE:

SEE ABOVE RIGHT
MATCH LINE:
"SR99" LINE
"SR99" LINE
2' 2'

2. 1.

INSIDE OF BARRIER WITH RESPECT TO ALIGNMENT.

TEMP RAILING (TYPE K) OFFSET IS IN REFERENCE TO
FOR LEGENDS AND GENERAL NOTES SEE TH-1.
(12')
(12')
(12')
(12')
(12')
(12')
(12')
(12')
(12')
(12')
(12')
(12')
27B
25 "MI6" LINE
(12')
(11.5')
(11')
A
A
12'
12'

MING AVE OFF-RAMP
27B
25 END TAPER (10:1)
END Temp RAILING (TYPE K)
27' Lt "MI6" 84+83.54
MODULE (ARRAY 'U21')
Temp CRASH CUSHION
Beg REMOVE Det 27B
END Det 36

47.07' Lt "SR99" 689+79.94
END REMOVE Det 27B
END Det 27B

48.57' Lt "SR99" 691+03.79
36 Beg TAPER (10:1)
Beg Temp RAILING (TYPE K)

54.32' Lt "SR99" 685+69.81
END TAPER (10:1)

61.61' Lt "SR99" 686+55.35
Beg Det 36
END Det 25
Beg TAPER (10:1)
2' Rt "MI6" 85+80.58
Beg TAPER (10:1)
14' Lt "MI6" 83+80.20Beg DET 25, 27B
12' Lt "MI6" 81+19.00
Beg Temp RAILING (TYPE K)
14' Lt "MI6" 82+00.00
Beg Temp RAILING (TYPE K)
2' Rt "MI6" 82+00.00

CHRIS COMMONS

MATTHEW BRASH
(TYPE K)
Temp RAILING
(TYPE K)
Temp RAILING
12'16' 4'
ZONE
WORK
ZONE
WORK
(1 EA)
MOUNTED) @ 45' SPACING

CHANNELIZERS (SURFACE
(5 EA)
MOUNTED) @ 45' SPACING

CHANNELIZERS (SURFACE
(11 EA)
MOUNTED) @ 45' SPACING

CHANNELIZERS (SURFACE