CITY OF BAKERSFIELD
Thomas Roads Improvement Program
SHEET 1 OF 16
CONTRACT NO. P.O. NO.
PROJECT:
FEDERAL NO. (S)
CONTRACTOR: Security Paving Company
ADDRESS: 2915 Fairhaven Drive
Bakersfield, CA 93309
YOU ARE HEREBY DIRECTED TO MAKE THE HEREIN DESCRIBED CHANGES FROM THE PLANS AND SPECIFICATIONS OR DO THE FOLLOWING WORK DESCRIBED NOT INCLUDED IN THE PLANS AND SPECIFICATIONS ON THIS CONTRACT.
NOTE: This change order is not effective until approved by City Council or City Engineer CHANGE SUBMITTED BY: Arturo Infante, Construction Manager DATE: 5/24/2024 CHANGE REQUESTED BY: Arturo Infante, Construction Manager DATE: 5/24/2024 ACCOUNT NO (S) 122-4021-825.80-41 TRCC21
127-4021-825.80-41 TRCC21 INCREASE $0.00
335-4021-825.80-41 TRCC21 DECREASE ($80,508.22)
By reason of this order the time of City Council Approval Required YES X completion will be adjusted as follows: NO ADJUSTMENT NO Approved As to Form: CITY ATTORNEY Approved by the Council of City of Bakersfield Approval Recommended: City Engineer Mayor
Countersigned: Finance Director Date
Contractor: Title:Accepted, Date:
We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above.
CONTRACT CHANGE ORDER
Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work of contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 19-069 22
NCIIPL-5109(251)
CHANGE ORDER NO.
Centennial Corridor MAINLINE
As authorized by the Engineer, and in accordance with section 4-1.05 "Changes and Extra Work" perform the following work:
Construct the screen walls to the layout and dimensions shown on sheet two of this change order.
DECREASE IN CONTRACT ITEMS AT CONTRACT ITEM PRICE:
Item No. A130, Masonry Block Wall (Spread Footing) -430.07 LF (-12.28%) @ $171.00/LF = $-73,541.97 (-12.28%) Item No. A131, Masonry Block Wall (Trench Footing) -120.25 LF (-60.13%) @ $257.00/LF = $-30,904.25 (-60.13%) TOTAL = $-104,446.22
ADJUSTMENT IN COMPENSATION AT AGREED LUMP SUM PRICE:
For not being able to complete the work of constucting these screenwalls as first order of work, as the Special Provisions dictate, resulting in increase labor and materials costs, the contractor shall receive and accept the agreed lump sum of $23,938.00. This sum constitutes full and comp lete compensation for furnishing all labor, material, equipment, tools, and incidentals including all markups by reason of this change.
Adjustment in Compensation at Agreed Lump Sum Price: $23,938.00
UNILATERAL
P
O
S
T
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
POOL
P
O
O
L
P
O
O
L
P
O
O
L
POOL
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
POOL
POOL
POOL
POOL
POOL
P
O
O
L
POOL
S
T
A
I
R
S S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
SS
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
S
T
A
I
R
S
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
TP
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
P
O
S
T
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
ASPH
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
ASPH
A
S
P
H
ASPH
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
ASP
H
ASPH
ASPH
A
S
P
H
ASPH
A
S
P
H
ASPH
ASPH
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
ASPH
A
S
P
H
ASPH
ASPH
ASPH
ASPH
A
S
P
H
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
C
O
N
C
C
O
N
C
C
O
N
C
D
I
R
T
D
I
R
T
D
I
R
T
D
I
R
T
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
CC
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
CONC
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
CONC
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
CC
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
CC
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
CC
O
N
C
C
O
N
C
C
O
N
CC
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
ON
C
C
O
N
C
C
O
N
C
C
O
N
CC
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
D
P
D
P
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
M
I
S
C
.
ASPH
ASPH
ASPH
ASPH
M
I
S
C
.
M
I
S
C
.
F
P
M
I
S
C
.
P
O
S
T
M
I
S
C
.
P
O
O
L
M
I
S
C
.
M
I
S
C
.
F
P
F
P
P
O
O
L
M
I
S
C
.
ASPH
ASPH
ASPH
ASPH
ASPH
P
O
O
L
ASPH
ASPH
ASPH
ASPH
ASPH
DIRT
POOL
ASPH
ASPH
A
S
P
H
F
P
C
O
N
C
CONC
CONC
CONC
CONC
CONC
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
S
T
A
I
R
S
G
A
T
E
S
T
A
I
R
S
F
P
W
A
L
K
D
E
C
K
F
P
P
O
S
T
P
O
S
T
P
O
S
T
S
P
O
S
T
S
P
O
S
T
P
O
S
T
P
O
S
T
S
P
O
S
T
S
P
O
S
T
S
G
A
T
E
P
O
S
T
SP
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
D
E
C
K
G
A
T
E
G
A
T
E
G
A
T
E
P
O
S
T
S
N
E
T
N
E
T
P
L
A
Y
G
R
O
U
N
D
D
I
R
T
P
O
S
T
S
P
O
S
T
S
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
A
S
P
H
A
S
P
H
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
G
A
T
E
G
A
T
E D
I
R
T
P
I
L
E
G
A
T
E
G
A
T
E
G
A
T
E
G
A
T
EP
O
S
T
S
G
A
T
E
P
O
S
T
S
F
P
P
O
S
T
S
P
O
S
T
S
P
O
S
T
S
P
O
S
T
S
P
O
S
T
S
P
O
S
T
S
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
A
S
P
H
D
I
R
T
D
I
R
T
D
I
R
T
D
I
R
T
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
S
T
S
G
A
T
E
P
O
O
LP
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
P
O
S
T
S
P
O
O
L
P
O
O
L
P
O
O
L
P
O
O
L
370
380
380
370
3 9
0 3
8 0
390
U
V
V
C
V
C
U
V
D
I
D
I
D
I
D
I
U
V
V
C
V
C
V
C
U
V
V
C
V
C
V
C
V
C
U
V
V
C
V
C
U
V
U
V
U
V
V
C
V
C
V
C
V
C
U
V
U
V
U
V
U
V
U
V
U
V
V
C
U
V
U
V
V
C
U
V
U
V
U
V
U
V
U
V
U
V
U
B
U
V
V
C
U
V
U
V
V
C
U
V
V
C
V
C
V
C
U
V
U
V
V
C
U
V
V
C
V
C
U
B
U
V
V
C
V
C
U
V
U
V
T
S
V
C
U
V
V
C
U
V
U
V
V
C
U
V
U
V
V
C
U
V
V
C
V
C
U
B
U
V
V
C
U
B
V
C
V
C
T
S
T
S
T
S
T
S
U
V
V
C
V
C
U
V
V
C
V
C
V
C
U
V
U
V
V
C
V
C
V
C
U
V
V
C
U
B
V
C
U
V
V
C
V
C
V
C
U
V
V
C
U
B
U
V
V
C
U
V
V
C
U
V
U
B
U
V
V
C
U
V
T
S
T
S
V
C
U
V
U
V
V
C
V
C
V
C
V
C
U
V
T
S
T
S
V
C
T
S
U
V
U
B
V
C
U
V
V
C
V
C
U
V
U
V
V
C
V
C
V
C
T
S
U
V
U
V
V
C
V
C
U
V
U
B
U
V
U
V
U
V
U
V
U
V
U
V
U
V
U
V
V
C
U
V
T
S
U
V
T
S
U
V
U
V
U
B
U
V
U
V
V
C
V
C
V
C
V
C
U
V
V
C
V
C
T
S
U
V
V
C
U
V
390
390
U
V
U
V
T
S
U
V
U
V
U
V
U
V
V
C
S
T
A
I
R
S
U
V
U
V
U
V
V
C
V
C
V
C
V
C
U
V
V
C
U
V
V
C
U
V
T
S
V
C
V
C
U
V
U
B
U
B
V
C
U
V
M
I
S
C
.
U
V
V
C
V
C
V
C
U
B
U
V
T
S
T
S
U
B
V
C
V
C
V
C
V
C
V
C
U
V
U
V
T
S
U
V
U
V
U
V
V
C
V
C
V
C
V
C
V
C
T
S
V
C
U
V
V
C
V
C
V
C
V
C
V
C
U
V
U
B
V
C
V
C
U
B
V
C
U
V
U
B
D
I
V
C
T
S
V
C
V
C
V
C
U
V
U
V
V
C
U
V
U
V
D
I
V
C
V
C
D
I
U
V
U
B
T
S
V
C
V
C
T
S
T
S
W
E
L
L
D
I
V
C
V
C
T
S
U
V
W
E
L
L
T
S
V
C
V
C
U
B
T
S
U
V
U
V
U
B
T
S
U
B
T
S
V
C
U
V
U
V
U
B
V
C
D
I
W
E
L
L
V
C
U
V
U
B
U
B
U
B
V
C
V
C
U
B
V
C
U
V
V
C
U
V
U
B
W
E
L
L
V
C
U
V
V
C
V
C
U
B
U
V
V
C
U
B
U
B
U
B
V
C
V
C
U
B
V
C
T
S
T
S
U
B
U
V
U
V
V
C
T
S
V
C
U
V
T
S
V
C
U
B
V
C
U
B
U
V
U
V
U
B
V
C
V
C
U
B
U
B
U
V
U
B
P
O
O
L
V
C
U
V
U
B
U
B
U
B
V
C
U
B
U
B
U
B
U
B
P
O
O
L
U
B
U
B
U
V
U
V
U
B
U
B
U
B
U
B
U
B
U
V
U
B
U
B
U
B
U
V
U
B
U
B
U
B
U
B
U
B
U
B
U
B
U
V
U
V
1 5
2 0
2 5
130
60 65
70 75
20 25
1 5
2 0
1 0
15 2
0 25
30 15
20 25
5 10
15 15
20 25
690
695
690
695
15 20
25 2
3 5
2 4
0 2
4 5
2 5
0 2
5 5
2 6
0 2
6 5
315
510
515
520
525
530
535
540
545 550
555
560
565
5 7
0 5
7 5
85 90
95 100
60 55
65 70
75 30
8 9
310
1 2
3 4
315
6 7
8 9
320
501
601
602
325
330
1 9
8 7
6 4
3 2
1 2
1 8
9 6
7 1
4 6
2 3
205
210
7 200
215
3 4
1 2
1 2
3 4
305
7 6
4 LEGEND
SCALE: 1" = 200'
S
T
O
C
K
D
A
L
E
H
W
Y
REAL ROAD
STINE ROAD
F
O
R
D
A
V
E
J
O
S
E
P
H
D
R
LA MIRADA
MARELLA WAY
MONTCLAIR ST
C
A
L
IF
O
R
N
IA
A
V
E
SCREEN WALL INFORMATION
CENTENNIAL CORRIDOR
END SCREEN WALL (STANDARD FOOTING)
118' Lt "SR58" 515+20.51
EC
122.44' Lt "SR58" 514+38.20
BC
128.77' Lt "SR58" 513+92.60
Beg SCREEN WALL (STANDARD FOOTING)
147.88' Lt "SR58" 513+07.91
Beg WOOD FENCE
114.49' Rt "SR58" 513+59.42
END WOOD FENCE
113.93' Rt "SR58" 515+50.66
Beg SCREEN WALL (STANDARD FOOTING)
104' Lt "SR58" 538+49.98
AP
132.41' Lt "SR58" 541+80.12
AP
132.86' Lt "SR58" 541+89.12
AP
128.64' Lt "SR58" 542+06.56
AP
128.95' Lt "SR58" 542+14.35
AP
134' Lt "SR58" 542+15.78
AP
135.5' Lt "SR58" 543+09.33
END SCREEN WALL (STANDARD FOOTING)
145.49' Lt "SR58" 545+04.48
Beg WOOD FENCE
185.32' Rt "SR58" 539+40.84
Beg SCREEN WALL (TRENCH FOOTING)
END WOOD FENCE
88.12' Rt "SR58" 539+61.57
AP
87.86' Rt "SR58" 539+65.21
AP
86.84' Rt "SR58" 539+65.43
BC
87.66' Rt "SR58" 539+69.26
EC
92.54' Rt "SR58" 540+19.82
BC
139.91' Rt "SR58" 542+03.69
EC
151.45' Rt "SR58" 542+50.68
AP
166.62' Rt "SR58" 542+98.05
END SCREEN WALL (STANDARD FOOTING)
161.61' Rt "SR58" 544+88.47
Beg SCREEN WALL (STANDARD FOOTING)
END SCREEN WALL (TRENCH FOOTING)
PCC
87.54' Rt "SR58" 539+73.20
Beg SCREEN WALL (STANDARD FOOTING)
BC
174.93' Lt "SR58" 547+16.93
EC
173.78' Lt "SR58" 547+98.35
BC
168.05' Lt "SR58" 548+12.42
EC
159.96' Lt "SR58" 548+54.29
AP
155.82' Lt "SR58" 548+61.32
END SCREEN WALL (STANDARD FOOTING)
251.75' Lt "SR58" 549+31.84
Beg SCREEN WALL (STANDARD FOOTING)
181.88' Rt "SR58" 547+46.31
END SCREEN WALL (STANDARD FOOTING)
138.77' Rt "SR58" 547+69.22
Beg SCREEN WALL (TRENCH FOOTING)
139.71' Rt "SR58" 548+31.44
Beg SCREEN WALL (STANDARD FOOTING)
END SCREEN WALL (TRENCH FOOTING)
139.49' Rt "SR58" 548+39.98
(STANDARD FOOTING)
END SCREEN WALL
"SR58" 549+53.49
221.25' Rt
Beg SCREEN WALL (STANDARD FOOTING)
182.95' Rt "SR58" 555+21.65
AP
186.09' Rt "SR58" 555+95.56
END SCREEN WALL (STANDARD FOOTING)
189.87' Rt "SR58" 556+64.76
Beg SCREEN WALL (STANDARD FOOTING)
191.70' Rt "SR58" 556+88.00
AP
194.38' Rt "SR58" 557+85.55
AP
208.86' Rt "SR58" 559+95.22
AP
230.60' Rt "SR58" 562+66.96
BC
225.43' Rt "SR58" 562+87.08
Beg SCREEN WALL (TRENCH FOOTING)
END SCREEN WALL (STANDARD FOOTING)
229.02' Rt "SR58" 562+56.45
Beg SCREEN WALL (STANDARD FOOTING)
END SCREEN WALL (TRENCH FOOTING)
EC
232.80' Rt "SR58" 563+15.09
AP
238.20' Rt "SR58" 563+70.10
AP
274.38' Rt "SR58" 563+99.54
END SCREEN WALL (STANDARD FOOTING)
281.25' Rt "SR58" 565+51.22
1 2
3 4
5 6
XNo. R À T
CURVE DATA
1 289.00' 23.24' 46.38'
L
2 187.00' 1.97' 3.94'
3 187.00' 23.63' 47.01'
4 406.00' 25.83' 51.59'
5 101.00' 40.18' 76.48'
6 20.22' 39.77'89.00'
SCREEN WALL (STANDARD FOOTING)
SCREEN WALL (TRENCH FOOTING)
WOOD FENCE
EXISTING R/W
PROPOSED R/W
CUT/FILL LINE
502
1/10/2019 5:18:38 PM
DATUM Elev 370
380
390
400
410
10+00 10+20 10+40 10+60 10+80 11+00
LENGTH
Elev 389.89
FG
OG
11+20 11+40 11+60 11+80 12+00 12+20
Elev 398.89
BEGIN SCREENWALL No. 1, 10+00.00
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "1" LOL = 216.69'
SCREENWALL
48' 48' 48' 48' 24.69'
Elev 399.06
10+24.00
Elev 399.22
10+48.00
HEIGHT 8' 8.67' 8.67' 8' 8'
Elev 399.88
10+48.00
Elev 400.04
10+72.00
Elev 400.20
10+96.00
Elev 400.11
11+20.00
Elev 400.01
11+44.00
Elev 399.35
11+44.00
Elev 399.19
11+68.00
Elev 399.02
11+92.00
Elev 399.02
END SCREENWALL No. 1, 12+16.69
Elev 390.06 Elev 390.22
Elev 390.38
Elev 390.54
Elev 390.44
Elev 390.35
Elev 390.19 Elev 390.02 Elev 390.02
10+87.38 BC 11+33.76 EC
SCREENWALL
TOP OF
(Typ)
EXPANSION JOINT
SCALE: 1"=20'
SCREENWALL No. 1
380
390
400
410
10+00 10+20 10+40 10+60 10+80 11+00
LENGTH
Elev 387.52
OG
11+20 11+40 11+60 11+80 12+00 12+20
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "2" LOL = 633.77'
SCREENWALL
48' 48' 48' 48'
Elev 397.35
10+24.00
HEIGHT 8.67' 8'
Elev 397.51
10+48.00
Elev 397.67
10+72.00
Elev 397.32
11+20.00
Elev 387.68
SCREENWALL
TOP OF
(Typ)
EXPANSION JOINT
12+40 12+60 12+80 13+00
48' 48'
8'
48'
8.67' 8' 8.67' 8.67'
10+39.38 PI
10+43.40 PI
10+47.42 PI
Elev 387.84 Elev 388.00
Elev 397.16
10+96.00Elev 397.83
10+96.00
Elev 388.16 Elev 388.32
Elev 397.48
11+44.00
Elev 388.48
Elev 397.62
11+68.00
Elev 388.62
Elev 397.75
11+92.00
Elev 398.41
11+92.00
Elev 388.75
Elev 398.41
12+16.00
Elev 388.75
Elev 398.42
12+40.00
Elev 388.75
Elev 398.57
12+64.00
Elev 388.91
Elev 398.74
12+88.00
Elev 398.07
12+88.00
Elev 389.07 Elev 389.17
MATCH LINE SCREENWALL No. 2 13+20.00
Elev 397.19
No. 2, 10+00.00
BEGIN SCREENWALL
SCALE: 1"=20'
SHEET 1
SCREENWALL No. 2
Elev 370
DATUM
Elev 398.17
13+12.00
Elev 398.20
13+20.00
Elev 389.20
Elev 397.46
END SCREENWALL No. 2, 16+33.77
13+20 13+40 13+60 13+80 14+00 14+20 14+40 14+60 14+80 15+00 15+20 15+40 15+60 15+80 16+00 16+20 16+40 8'
48'
8'
48'
8'
48'
8'
48' 48'
8'
36'
8.67' 8'
21.77'
Elev 388.46
13+35.42 PI
Elev 398.26
13+36.00
Elev 389.26
13+52.31 PI
13+59.64 PI
13+64.87 PI
Elev 398.26
13+60.00
Elev 389.26
Elev 398.26
13+84.00
Elev 389.26
Elev 398.26
14+08.00
Elev 389.26
Elev 398.26
14+32.00
Elev 389.26
14+52.42 PI
Elev 398.14
14+56.00
Elev 389.14
Elev 398.02
14+80.00
Elev 389.02
Elev 398.02
15+04.00
Elev 389.02
Elev 398.02
15+28.00
Elev 389.02
Elev 398.69
15+28.00
Elev 398.53
15+52.00
Elev 388.86
Elev 398.37
15+76.00
Elev 388.70
Elev 397.70
15+76.00
Elev 388.58 Elev 388.46
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "2" LOL = 633.77'
SCREENWALL
48'
8'
Elev 397.58
15+94.00
Elev 397.46
16+12.00
SCALE: 1"=20'
SHEET 2
SCREENWALL No. 2
MATCH LINE SCREENWALL No. 2 13+20.00
380
390
400
410
Elev 370
DATUM
DATUM Elev 370
380
390
400
410
10+00 10+20 10+40 10+60 10+80 11+00
LENGTH
Elev 387.97
FG
OG
11+20 11+40 11+60 11+80 12+00 12+20
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "3" LOL = 241.08'
SCREENWALL
48' 48' 48' 48'
Elev 397.76
10+24.00
Elev 397.90
10+48.00
HEIGHT 8.67' 8.67' 8'
Elev 398.56
10+48.00 Elev 399.71
11+20.00
Elev 399.71
11+68.00
Elev 398.88
11+92.00
Elev 398.56
END SCREENWALL No. 3, 12+41.08
Elev 388.10
10+76.48 EC
10+90.62 BC
SCREENWALL
TOP OF
(Typ)
EXPANSION JOINT
12+40 12+60
8.67' 8.67'
24'
8'
25.08'
Elev 388.23 Elev 388.90
Elev 398.72
10+72.00
Elev 399.39
10+72.00
Elev 389.06
Elev 389.73
FOOTING STEP (Typ)
Elev 397.63
BEGIN SCREENWALL No. 3, 10+00.00 BC Elev 399.55
10+96.00
Elev 389.88
Elev 390.05
11+30.39 EC
Elev 399.87
11+44.00
Elev 390.21
11+38.10 PI
Elev 390.05
Elev 399.55
11+92.00
Elev 389.88
Elev 398.72
12+16.00
Elev 389.72 Elev 389.56
FG
SCALE: 1"=20'
SCREENWALL No. 3
DATUM Elev 370
10+00 10+20 10+40 10+60 10+80 11+00 11+20 11+40 11+60
380
390
400
410
LENGTH
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "4" LOL = 160.50'
SCREENWALL
48' 48'
HEIGHT
28.50'
Elev 399.83
BEGIN SCREENWALL No. 4, 10+00.00
Elev 399.67
10+24.00
Elev 399.51
10+48.00
Elev 399.35
10+72.00
10+05.00 PI
Elev 398.09
END SCREENWALL No. 4, 11+60.50
SCREENWALL
TOP OF
(Typ)
EXPANSION JOINT FG
OGElev 390.16 Elev 390.00 Elev 389.84
Elev 389.68
Elev 389.52 Elev 389.40
36'
8'8.67' 8'
Elev 399.19
10+96.00
Elev 398.52
10+96.00
11+80
Elev 389.09
SCALE: 1"=20'
SCREENWALL No. 4
8.67'
Elev 398.40
11+14.00
Elev 398.28
11+32.00
Elev 389.28
DATUM Elev 370
10+00 10+20 10+40 10+60
380
390
400
410
LENGTH 24'
8'HEIGHT
Elev 398.77
BEGIN SCREENWALL No. 5, 10+00.00
Elev 398.93
10+24.00
Elev 399.10
END SCREENWALL No. 5, 10+49.67
SCREENWALL
TOP OF
(Typ)
EXPANSION JOINT
OGElev 389.77 Elev 389.93 Elev 390.10
ALONG SCREEWNALL "5" LOL = 49.67'
TOTAL LENGTH OF WALL MEASURED
SCREENWALL
8'
25.67'
SCALE: 1"=20'
SCREENWALL No. 5
380
390
400
410
10+00 10+20 10+40 10+60 10+80 11+00
LENGTH
OG
11+20 11+40 11+60 11+80 12+00 12+20
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "6" LOL = 565.07'
SCREENWALL
48' 48' 48' 48'
Elev 398.20
10+24.00
HEIGHT
SCREENWALL
TOP OF
(Typ)
EXPANSION JOINT
12+40 12+60 12+80
48' 48'
Elev 385.28
MATCH LINE SCREENWALL No. 6 12+80.00
SCALE: 1"=20'
SHEET 1
SCREENWALL No. 6
Elev 370
DATUM
8'
Elev 389.20
FG
8' 8' 8' 8' 8'
Elev 398.13
10+48.00
Elev 389.13
Elev 398.28
No. 6, 10+00.00 BC
BEGIN SCREENWALL
10+08.61 BC10+04.69 PI
10+03.64 EC
10+59.56 EC
Elev 398.06
10+72.00
Elev 389.06
Elev 397.99
10+96.00
Elev 388.99
Elev 397.92
11+20.00
Elev 388.92 Elev 388.84
Elev 397.84
11+44.00
Elev 397.77
11+68.00
Elev 388.77
Elev 397.70
11+92.00
Elev 388.70 Elev 388.63
Elev 397.63
12+16.00
Elev 397.56
12+40.00
Elev 388.56
12+55.02 BC
Elev 397.48
12+64.00
Elev 388.48
Elev 385.24
Elev 389.24
Elev 398.24
10+12.55
13+20 13+40 13+60 13+80 14+00 14+20 14+40 14+60 14+80 15+00 15+20 15+40 15+60 15+80 48' 48'
8'
48'
SCALE: 1"=20'
SHEET 2
SCREENWALL No. 6
MATCH LINE SCREENWALL No. 6 12+80.00
380
390
400
410
Elev 370
DATUM
13+00
24'
8.67'
12+80
8'
48'
Elev 398.14
14+32.00
Elev 388.41
8'
24'
8.67' 8.67' 8'
48'
8'
24'
8.67'
13.07'
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "6" LOL = 565.07'
SCREENWALL
Elev 397.41
12+88.00
13+06.61 EC
Elev 397.34
13+12.00
Elev 398.01
13+12.00
Elev 388.34
Elev 398.17
13+36.00
Elev 388.50
13+59.78 PI
Elev 398.33
13+60.00
Elev 388.66
Elev 398.49
13+84.00
Elev 388.82
Elev 398.65
14+08.00
Elev 388.98
Elev 398.81
14+32.00
Elev 389.14
Elev 398.00
14+56.00
Elev 389.00
Elev 397.86
14+80.00
Elev 388.86
Elev 397.71
15+04.00
Elev 388.71
Elev 397.57
15+28.00
Elev 388.57
Elev 397.42
15+52.00
Elev 388.43
Elev 387.76
Elev 397.35
END SCREENWALL No. 6, 15+65.07
Elev 387.68
(Typ)
EXPANSION JOINT
SCREENWALL
TOP OF
OGFG
DATUM Elev 370
10+00 10+20 10+40 10+60 10+80 11+00 11+20 11+40 11+60
380
390
400
410
LENGTH
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "8" LOL = 155.95'
SCREENWALL
48' 48' 36'
8' 8'HEIGHT
23.95'
8'8'
Elev 397.66
BEGIN SCREENWALL No. 8, 10+00.00
Elev 397.73
10+24.00
Elev 397.81
10+48.00
Elev 397.88
10+72.00
10+80.46 PI
Elev 397.95
10+96.00
Elev 398.07
11+14.00
Elev 398.19
11+32.00
Elev 398.35
END SCREENWALL No. 8, 11+55.95
SCREENWALL
TOP OF
(Typ)
EXPANSION JOINTFG
OGElev 388.66 Elev 388.73 Elev 388.81 Elev 388.88 Elev 388.95 Elev 389.07 Elev 389.19 Elev 389.35
SCALE: 1"=20'
SCREENWALL No. 8
380
390
400
410
10+00 10+20 10+40 10+60 10+80 11+00
LENGTH
OG
11+20 11+40 11+60 11+80 12+00 12+20
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "9" LOL = 975.09'
SCREENWALL
48' 48' 48' 48'
Elev 399.35
10+24.00
HEIGHT 8.67'
SCREENWALL
TOP OF
(Typ)
EXPANSION JOINT
12+40 12+60 12+80
48' 48'
8.67' 8.67'
Elev 389.52
MATCH LINE SCREENWALL No. 9 12+80.00
SCALE: 1"=20'
SHEET 1
SCREENWALL No. 9
Elev 370
DATUM
8.67' 8.67' 8'
11+06.54 PI
Elev 399.19
No. 9, 10+00.00
BEGIN SCREENWALL
Elev 389.68
Elev 399.51
10+48.00
Elev 400.18
10+48.00
Elev 389.84
FG
Elev 390.52
Elev 400.34
10+72.00
Elev 390.67
Elev 400.50
10+96.00
Elev 390.83
Elev 400.66
11+20.00
Elev 390.99
Elev 400.82
11+44.00
Elev 391.15
Elev 400.98
11+68.00
Elev 391.31
Elev 401.14
11+92.00
Elev 391.47
Elev 400.98
12+16.00
Elev 391.31
Elev 400.82
12+40.00
FOOTING STEP (Typ)
Elev 400.15
12+40.00
Elev 391.15
Elev 399.99
12+64.00
Elev 390.99
Elev 398.47
14+32.00
13+20 13+40 13+60 13+80 14+00 14+20 14+40 14+60 14+80 15+00 15+20 15+40 15+60 15+80 48'
8'
48'
8'
48'
8'
36' 48'
8.67'
Elev 389.47
SCALE: 1"=20'
SHEET 2
SCREENWALL No. 9
MATCH LINE SCREENWALL No. 9 12+80.00
380
390
400
410
Elev 370
DATUM
13+00
MATCH LINE SCREENWALL No. 9 15+80.00
8.67'
48'
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "9" LOL = 975.09'
SCREENWALL
8.67'
12'
8.67'
8.67'
48'
12+80
8'
48'
13+36.71 PI
Elev 398.34
13+12.00
Elev 399.00
13+12.00
Elev 399.08
13+00.00
Elev 399.75
13+00.00
Elev 399.83
12+88.00
Elev 388.67
Elev 389.34
Elev 389.42
Elev 390.09
Elev 390.84
390.16
Elev
Elev 398.50
13+36.00
Elev 388.83
Elev 398.66
13+60.00
Elev 388.99
Elev 398.15
13+84.00
Elev 398.82
13+84.00
Elev 389.15
Elev 398.31
14+08.00
Elev 389.31
Elev 398.47
14+56.00
Elev 389.47
Elev 398.47
14+80.00
Elev 389.47
Elev 398.33
15+04.00
Elev 389.33
Elev 398.25
15+16.00
Elev 389.25
Elev 388.58
Elev 398.17
15+28.00
Elev 388.50
Elev 398.05
15+52.00
Elev 388.38
Elev 397.93
15+76.00
Elev 388.26
SCREENWALL
TOP OF
(Typ)
EXPANSION JOINTFG
OG
SCALE: 1"=20'
SHEET 3
SCREENWALL No. 9
16+20 16+40 16+60 16+80 17+00 17+20 17+40 17+60 17+80 18+00 18+20 18+40 18+60 18+80 MATCH LINE SCREENWALL No. 9 15+80.00
380
390
400
410
Elev 370
DATUM
16+00
MATCH LINE SCREENWALL No. 9 18+80.00
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "9" LOL = 975.09'
SCREENWALL
8.67'
48'
8.67'
48'
8.67'
48'
8.67'
48'
8.67'
48'
8.67'
48'
8.67'
48'
15+80
18+03.24 PI17+54.25 PI
16+92.83 EC16+64.12 BC
16+25.68 PI
Elev 397.81
16+00.00
Elev 388.14
Elev 397.69
16+24.00
Elev 388.02
Elev 397.53
16+48.00
Elev 383.11
Elev 397.37
16+72.00
Elev 382.95
Elev 397.20
16+96.00
Elev 387.54
Elev 397.04
17+20.00
Elev 387.38
Elev 397.17
17+44.00
Elev 387.50
Elev 397.30
17+68.00
Elev 387.63
Elev 397.42
17+92.00
Elev 387.75
Elev 397.55
18+16.00
Elev 387.88
Elev 397.55
18+40.00
Elev 387.88
Elev 397.55
18+64.00
Elev 387.88
Elev 398.21
18+64.00
Elev 388.55Elev 388.01
Elev 383.26
Elev 382.81
Elev 387.56
SCREENWALL
TOP OF
(Typ)
EXPANSION JOINTFG
OG
Elev 398.43
18+96.00
Elev 389.43
SCALE: 1"=20'
SHEET 4
SCREENWALL No. 9
19+40 19+60 19+80
8'
36'
MATCH LINE SCREENWALL No. 9 18+80.00
380
390
400
410
Elev 370
DATUM
19+00 19+20
8.67'
48'
8'
27.09'
18+80
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "9" LOL = 975.09'
SCREENWALL
Elev 398.43
END SCREENWALL No. 9, 19+75.09
Elev 398.43
19+48.00
Elev 398.43
19+30.00
Elev 389.43Elev 389.43Elev 389.43
Elev 398.43
19+12.00
Elev 399.09
19+12.00
Elev 399.09
18+96.00
Elev 389.43
Elev 388.76
SCREENWALL
TOP OF
(Typ)
EXPANSION JOINT
OG
DATUM Elev 370
10+00 10+20 10+40 10+60 10+80 11+00 11+20 11+40 11+60
380
390
400
410
LENGTH 48' 24'
HEIGHT
27.11'
Elev 409.44
10+24.00
SCREENWALL
TOP OF
(Typ)
EXPANSION JOINT FG
OG
Elev 399.77
SCALE: 1"=20'
SCREENWALL No. 10
TOTAL LENGTH OF WALL MEASURED ALONG SCREEWNALL "10" LOL = 147.11'
SCREENWALL
8.67'8.67' 8.67'
Elev 408.77
10+24.00
FOOTING STEP (Typ)
Elev 399.11
Elev 398.44
Elev 397.77
Elev 396.44
Elev 395.77
Elev 395.11
Elev 394.44
Elev 408.11
10+48.00
Elev 408.77
10+48.00
Elev 407.44
10+72.00
Elev 408.11
10+72.00
Elev 409.44
BEGIN SCREENWALL No. 10, 10+00.00 BC
Elev 404.11
END SCREENWALL No. 10, 11+47.11 EC
Elev 406.11
10+96.00
Elev 404.77
11+20.00
Elev 405.44
11+20.00
Elev 404.11
11+32.00
Elev 404.77
11+32.00
Elev 405.44
11+08.00
Elev 406.11
11+08.00
Elev 407.44
10+84.00
Elev 406.77
10+84.00
406.77
Elev
10+96.00
Elev 397.11
48'
8.67'