Complete Streets Ordinance Yearly Report FY 23/24
Projects
The City of Bakersfield Public Works Department is committed to proactively identifying and implementing Traffic Calming measures throughout the City. These efforts aim to reduce pedestrian and cyclist-related incidents while fostering a safe, inclusive environment for all modes of transportation. The following is a list of both current and past projects, each strategically designed with multi-modal transportation and traffic safety as key priorities.
*G rant Funded
Complete Streets
Project Execution Status
Complete Streets along Stine
Rd: Ming Ave to Wilson Rd
APD (Design)
Construction Complete
Streets (Install)
Complete Streets along Baker
St: Monterey St to 21st St*
APD (Design)
Preliminary Design. Contractor (Install)
Corridor Enhancements:

Chester Ave Design Engineering (Design) Design Complete. Construction funding request for FY25/26.

Corridor Enhancements: 18th St
and 19th St Design Engineering (Design) Design underway.

Corridor Enhancements: MLK
Blvd* Consultant (Design) Contractor (Install) Design at 75%. Construction funding request for FY25/26.

Corridor Enhancements:

Monitor St Consultant (Design) Contractor (Install) Design at 75%. Construction funding request for FY25/26.

Corridor Enhancements: H St* Consultant (Design) Contractor (Install) Design at 75%. Pending Environmental and Right-of-Way approvals through Caltrans.

Corridor Enhancements: Niles
St & Monterey St Consultant (Design) Contractor (Install) Design at 65%. Phase 1 Construction funding request for FY25/26.

2 | Page

Striping
Traffic Striping – Ming Ave: Allen Rd to
Buena Vista St
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – Ashe Rd: Stockdale Hwy to
Panama Ln
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – White Ln: Allen Rd to
Buena Vista St
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – Allen Rd: Stockdale Hwy to
White Ln
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – Buena Vista Rd: White Ln
to RR Tracks
APD (Design)
Construction Complete
Streets (Install)
Traffic Striping – 18th St Angled Parking
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – Fairfax Rd: Auburn St to
Paladino Dr
APD (Design)
Construction Complete
Streets (Install)
Traffic Striping – Brimhall Rd: Calloway Dr
to Woodmont Dr
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – Chester: 24th St to Garces
Circle
APD (Design)
Construction Complete
Streets (Install)
Traffic Striping – Madison St: E Planz Rd to
White Ln
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – Striping along Grand Lakes
Ave
APD (Design)
Construction Complete
Streets (Install)
Traffic Striping – 18th St/Franklin
Elementary (Traffic Calming)
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – Buena Vista Rd: Harris Rd
to RR Tracks
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – Rafer Johnson School Area
(10th & N St)
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – Espee St: Niles St to Q St
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – Fairfax Rd: Auburn St to
Royal Coach Cir
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – Ming Ave: Union Ave to H
St
APD (Design)
Construction Complete
Streets (Install)
Traffic Striping – P St: Ming Ave to Belle
Terrace
APD (Design)
Construction Complete Streets (Install)
Traffic Striping – Planz Rd: S. H St to S.

Chester Ave
APD (Design)
Construction Complete
Streets (Install)
Traffic Striping – Wible Rd: Mckee Rd to
Hosking Ave
APD (Design)
Construction Complete Streets (Install)

3 | Page

Traffic Calming and Pedestrian Improvements
Project Execution Status
Traffic Calming - Oleander Ave: E California
Ave to Brundage Ln APD (Design) Final Design Review
Streets (Install)
Pedestrian Improvements - Wible Rd:

Berkshire Rd to Panama Ln APD (Design) Design at 90%. Construction funding request for FY25/26.

Contractor (Install)
Rapid Rectangular Flashing Beacon - Truxtun
Ave at Pine St* APD (Design) Preliminary Design.

Contractor (Install)
Rapid Rectangular Flashing Beacon - Chester
Ave at 22nd St* APD (Design) Preliminary Design.

Contractor (Install)
Pedestrian Improvements: Q St and Espee St Design Engineering (Design) Phase 1 of Construction Complete.

Speed Hump – Christmas Tree Ln APD (Design) Design Complete.

Streets (Install)
Speed Hump – Gasoline Alley Dr APD (Design) Design Complete.

Streets (Install)
Speed Hump – Sundale Ave APD (Design) Design Complete.

Streets (Install)
Speed Hump – Jewett Ave APD (Design) Design Complete.

Streets (Install)
Speed Hump – O St APD (Design) Design Complete.

Streets (Install)
Speed Hump – Real Rd APD (Design) Design Complete.

Streets (Install)
Speed Hump – Beech St APD (Design) Design Complete.

Streets (Install)
Speed Hump – Custer Ave APD (Design) Design Complete.

Streets (Install)
Speed Hump – District Blvd APD (Design) Design Complete.

Streets (Install)
Speed Hump – Sandra Dr APD (Design) Design Complete.

Streets (Install)
Flashing Beacons: Norris Rd & Stiern Middle
School APD (Design) Construction start date: 2/18/25
Contractor (Install)
Garces Memorial Circle Enhancement Consultant (Design) Contractor (Install)
Open to Public; Landscaping under
construction.

Flashing Beacon: Veterans Elem, Warren Jr
High* APD (Design) Installation complete. Awaiting power from PG&E.

Contractor (Install)
Flashing Beacon: Golden Valley High School APD (Design) Installation complete. Awaiting power from PG&E.

Contractor (Install)
4 | Page

Flashing Beacon: Calloway Dr (Norris),
Monitor St* APD (Design) Installation complete. Awaiting power from PG&E.

Contractor (Install)
Radar Feedback Signs: Various Locations* APD (Design) Construction Complete Contractor (Install)
Reflective Signal Backplates: Various
Locations* APD (Design) Construction Complete
Contractor (Install)
Rectangular Rapid Flashing Beacon: Heritage
Park/Mt Vernon Ave APD (Design) Construction Complete
Contractor (Install)
Traffic Calming Demo - Beale Ave: Niles St
and Monterey St APD (Design) Construction Complete
Contractor (Install)
Speed Hump – Marella Way @ Stockdale
Christian School APD (Design) Construction Complete
Streets (Install)
Speed Hump – Sandra Dr and Laurel Dr APD (Design) Construction Complete Streets (Install)
Speed Hump – Summertree Ln and Canter
Way APD (Design) Construction Complete
Streets (Install)
Speed Hump – El Potrero Ln and Mesa
Grande St APD (Design) Construction Complete
Streets (Install)
Speed Hump – Dennen St APD (Design) Construction Complete Streets (Install)
Speed Hump – Abbott Dr APD (Design) Construction Complete Streets (Install)
Speed Hump – Las Entradas APD (Design) Construction Complete Streets (Install)

Bike Trails
Project Execution Status
Stonecreek Loop: Class IV Cycle Track APD (Design) Design at 60%. Construction funding request for FY25/26.

Kentucky St Urban Greening - Beale Ave to Baker
St, Canal to Mt Vernon Ave* APD (Design) Preliminary Design. 24th St Bikepath Connector Bridge Consultant (Design)
Environmental permitting and review.

Additional Design Funding requested for
FY25/26
Multi-Use Path: Friant-Kern Canal* Consultant (Design)
Contractor (Install) Under Construction.

Bike Lane: Old County Dump Rd* APD (Design) Class I Bike Path Constructed. Pending installation of vehicle gate.

Multi-Use Path: Stockdale Ranch Consultant (Design)
Contractor (Install) Construction Complete