CITY OF BAKERSFIELD
Thomas Roads Improvement Program
SHEET 1 OF 3
CONTRACT NO. P.O. NO.
PROJECT:
FEDERAL NO. (S)
CONTRACTOR: Security Paving Company
ADDRESS: 2915 Fairhaven Drive
Bakersfield, CA 93309
YOU ARE HEREBY DIRECTED TO MAKE THE HEREIN DESCRIBED CHANGES FROM THE PLANS AND SPECIFICATIONS OR DO THE FOLLOWING WORK DESCRIBED NOT INCLUDED IN THE PLANS AND SPECIFICATIONS ON THIS CONTRACT.
NOTE: This change order is not effective until approved by City Council or City Engineer CHANGE SUBMITTED BY: Arturo Infante, Construction Manager DATE: 6/15/2025 CHANGE REQUESTED BY: Arturo Infante, Construction Manager DATE: 6/15/2025 ACCOUNT NO (S) 122-4021-825.80-41 TRCC21
127-4021-825.80-41 TRCC21 INCREASE $10,000.00
335-4021-825.80-41 TRCC21 DECREASE $0.00
By reason of this order the time of City Council Approval Required YES X completion will be adjusted as follows: NO ADJUSTMENT NO Approved As to Form: CITY ATTORNEY Approved by the Council of City of Bakersfield Approval Recommended: City Engineer Mayor
Countersigned: Finance Director Date
Contractor: Title:
CONTRACT CHANGE ORDER
Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work of contract price, agreed price and force account.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 19-069 171
NCIIPL-5109(251)
CHANGE ORDER NO.
Centennial Corridor MAINLINE
Accepted, Date:
We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above.
In accordance with section 4-1.05, "Changes and Extra Work", of the Standard Specifications, provide labor, equipment and materials as necessary to perform the following work:
Extra Work at Force Account:
At the southwest corner of S. Chester Ave and Richland St, and as shown on sheets two and three of this change order, install a new pull box and install conduit No 14.
Provide labor, equipments and materials as necessary to perform this work. The Contrator will be compensated for the actual costs. Contractor will submit invoices and extra work tickets in accordance with Section 9-1.04C of the Std Specs.
Labor, materials, and equipment, as approved by the Engineer, will be paid for in accordance with the provisions in Section 9-1.04, “Force Account” of the Standard Specifications.
All work shall be done in accordance with the attached revised plans, Special Provisions, Standard Plans and Specifications and as directed by the Engineer.
Extra Work at Force Account = $10,000.00
TIME ADJUSTMENT:
NO ADJUSTMENT
UNILATERAL
A
SP
H
C
ON
C
C
ON
C
AS PH
90 30 6789
Ker06
BAKERSFIELD, CALIFORNIA 93301
1600 TRUXTUN AVENUE
CITY OF BAKERSFIELD
ELECTRICAL
REGISTERED ELECTRICAL ENGINEER
PASADENA, CALIFORNIA 91124
100 WEST WALNUT STREET
PARSONS
MATTHEW BRASH
x
x
x
x
x
Dist COUNTY ROUTE POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
LAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
No.
Exp.
R
E
G
I
S
T
E
R
E
D
PROFESSIONAL
E
N
G
I
N
E
E
R
STATE OF CALIFORNIA
TIME PLOTTED =>
DATE PLOTTED =>
$TIME
$DATE
CHECKED BY
DESIGNED BY
CALCULATED- REVISED BY
DATE REVISED
PLANS APPROVAL DATE
DATE
CONSULTANT FUNCTIONAL SUPERVISOR
R
COPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
OR AGENTS SHALL NOT BE RESPONSIBLE FOR
THE STATE OF CALIFORNIA OR ITS OFFICERS
R
03-09-18
USERNAME => $USER
DGN FILE => $REQUEST
RELATIVE BORDER SCALE
IS IN INCHES
0 1 2 3
UNIT 1477 PROJECT NUMBER & PHASE 0600000484BORDER LAST REVISED 7/2/2010 99 58
22.7/23.8
R50.5/R55.5
DALE WILSON
MARIAM HABBOUSH
WILSON
DALE J.
13750
06/30/19
1464
10/10/18
10/10/18
CHESTER AVE
AT
SR-58 RAMPS
CHESTER AVE
STEA D Y DEMA ND SEQ UENCE
PHASE DIAGRAM
O6P
O6
O2P
NOTES:
OFFICE.
RIGHT OF WAY ENGINEERING AT THE DISTRICT
FOR ACCURATE RIGHT OF WAY DATA, CONTACT1.
OLB
O2P
OLB
O3
O3P
SEE SHEET E-59
CONDUIT NOTES:
2I4U
5J1U
6J3U 6J2U
AB
120/240V
SP PG&E
A
B
C
D
E
AB
AB
AB
CB
L
M
CROSS WALK
230' TO
AB
AB
AB
1 9
2 O3 O3
O3
O3P
O3P
OLB
OLB
OLB
O2PO2P
O6
O6
O6
O6P
O6P
RS AB
RS
RS
3 4
5 6
7 88
AB
1 4 # 8 (Ltg), 1 DLC
2"C, 2 # 6 (SIG N AL),
2"C, 1 DLC
3J6L
3I7U 3I7L
2"C, 1 DLC
2"C, 1 DLC
3 C
R
O
SS
W
A
L
K
1 4
0 ' T
O
14 OLA
OLA
OLA
5 5
MATCH LINE (SHEET E-58)
R
IC
H
L
AND
S
T
W
B
R
OU
TE
58 E
B
R
OU
TE
58 6
MATCH LINE (SHEET E-58)
PV
PV
RS
AB
RS
R
/
W
BC
Exist 1"C, 1-SIC 8
87 PV
PV2I2L
CROSS WALK
230' TO
15 AB 2
2. OTHERWISE NOTED.
ALL PULL BOXES MUST BE No. 5(TR)(E) UNLESS
6(E)
O3
O6
CB
4 # 8 (Ltg)
Exist 2"C, 2 # 6 (SIG N AL),
CC
AB
RC
10 (SERVICE ENTRA NCE CO N D UCTORS)
Exist 3"c,
6J3L
6J4L
6J4U
3I5U 3I5L
CB
2"C, 1-6 SMFO
SEE SHEET E-59
LEGEND:
5 5
BC
E-57
MODIFYING EXISTING ELECTRICAL SYSTEM
SCALE: 1" = 20'LOCATION 3 (SHEET 1 OF 3)
SIGNAL AND LIGHTING SYSTEM
SEE SHEET E-59
ABBREVIATIONS:
2I2L
700
6(TR)(E)
6(TR)(E)
ADDENDUM NO. 2
MEX'S BID PLAN SET 03/28/2019
B.I. # A267
UX
UY
VA
UZ
VB
VC
VD
VF
VE
VG
VH
VI
VJ
VK
VL
VM
VN
VO
VP
VQ
VR
VT
VV
VU
VW
VS
VX
VY
VZ
WA
WB
WC
WE
WD
WG
WH
WI
WF
WJ
WK
WL
WM
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
HLE'S BID PLAN SET 03/28/2019
171
2 3
Pullbox 5TR
Installation
09/13/2024
Pullbox 6TR
Installation
09/13/2024
Conduit 3" y 4"
Installation
09/13/2024
02 04
06 PHASE DETECTORS-DLC
SMA LMA 0
A
No.
B
C
D
E
F
12CSC
VEH-PED
1 2 3 4 6 7
PHASE
CABLE SCHEDULE
TYPE
CABLE
D
T
S
A
B
C
E
F
TOTAL
CIRCUITAWG
LIGHTING
AND SIZE
CONDUIT RUN NUMBER
8 G
#8
MESSAGE
RSNS
ARROWType
STANDARD MASTARMS SIGNAL MOUNTING
MAST ARM POLE PED
LUMINAIRE
TOTAL
CONDUIT SIZE
G
H
(N) (N) (E)
#6
H
REQUIREMENTS
SPECIAL
5 (N)
RW1 LED
APS PBA
(E) = EXISTING CONDUIT RUN, (N) = NEW CONDUIT
3CSC
PBA
APS CABLE
RS Exist CONDUCTORS, INSTALL CONDUCTORS AS SHOWN.
CHESTER AVE
AT
SR-58 RAMPS
CONDUCTOR AND CONDUIT SCHEDULE (SHEETS E-57, E-58, E-59 ONLY) POLE SCHEDULE (SHEETS E-57, E-58, E-59 ONLY)
9 10 12 1311
J
K
L
M
I
A
No.
B
C
D
E
F
G
H
J
K
L
M
I
STATION
A OR
OFFSET
B OR
I
J
K
L
M
(N) (N) (N) (N) (E) (N) (N) (N) (N)
D
6 3
03 SIGNAL POWER
1 1
1 1
1 1
1 1
1 1 1
11 1 1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1 1
1 1
1 1
1 14
(E)
1 7
6 6
6 4
4 5
5 4
4 3
3 2
2 1
1 5
5 4
4 3
3 2
2 1
1 1
2 2 222 2 2 2 2 2 2
2 2
2 2 22
4 11
4 1
4 1
4 1
4 4
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 23 26 22 26
2-4" 4" 4" 3" 2" 4" 4" 3" 3" 2"
- - - - 6 -
- - - - 3 -
29-5-100
- - - - 2 -
- - - - - TP-1-T 2 -
SP-1-T 350' 15' 165W 3-MAS SV-1-T
2SP-1-T -
26-1-100 35' 12' 165W SV-1-T SP-1-T 2 - RL Exist POLE.
RL Exist POLE.
1-A (10')
1-A (10')
MAS
1-A (10') - - - - SP-1-T 4 -
OLA,OLB,2P
2P
6P
2,2P
4,4P
OLC,OLD,6P
6 6
4 4
2 2
2 2
3 3
6 1 1
1 1 1
11 1 1 1
1 1
1 1
1 26-4-100 12'45' 165W SV-1-T SP-1-T 42-MAS
- - - - - 6
-
SP-1-T
TP-1-T
- - - - SP-1-T 6
SP-1-T
-
6 -
-
1 2
3 4
AMPERES VOLTS POLES LOAD METER
CONTROL TYPE
PHOTOELECTRIC
100 240 2 MAIN BREAKER YES
50 20
120
120
1 2 SPARE
TRAFFIC SIGNAL YES
YES
AMPERES VOLTS POLES LOAD METER
CONTROL TYPE
PHOTOELECTRIC
100 240 2 MAIN BREAKER YES
30 240
SPARE
YES
YES20 120 1
2 LIGHTING IV
-
-
-
-
-
INSTALL COUNTDOWN PED SIGNAL HEADS.
5 4
6 POLE PLACEMENT - 'CHE'
28+14.98
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
28+02.63
28+02.36
28+13.59
EXISTING
31+97.31
32+04.32
32+09.73
31+91.13
EXISTING
EXISTING
EXISTING
EXISTING
SV-2-TB
7 8
TO Exist TRAFFIC SIGNAL CONTROLLER AT RICHLAND AND H STREET. 1 13
15 (N)
2-4" 3-4"
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
12 22
2 2
3 1
4 1
4 1
4 1
4 1
4 1
4 1
15 15 6 4 22 20 15 11 6 3 46
1-A (7')(E)
19(E)
19(E)
19(E)
AL L EQ UIPMENT NEW U NL ES S SH OWN OTHERWISE (E)
RSNS = REFL ECTIVE STRE E T N AME SIG N
2-MAS(E)
TV-1-T
TV-1-T SP-1-T
SP-1-T
RS CONTROLLER CABINET
BETWEEN CONTROLLER CABINETS APPROX. DISTANCE = 560 FT.
RC Exist SIC. INSTALL NEW CAT5E OUTDOOR RATED CABLE CONTINUOUS INSTALL INDUCTIVE LOOP DETECTOR.
CTID No. 06500580053.681L
CTID No. 06500580053.681T
ENCLOSURE WITH THE FOLLOWING CIRCUIT BREAKERS:
Exist 120/240V, 1Á, 3 WIRE, TYPE III-CF SERVICE EQUIPMENT
63.75' RT
56.14' RT
53.79' LT
63.75' LT
57.91' LT
48.62' LT
50.96' RT
69.03' RT
02 ADV
03 ADV
04 ADV
06 ADV
1-A (10')
1-A (10')
TV-1-T
TV-2-T
TV-1-T
2-MAS(E)
MAS(E)
SV-1-T(E)
SV-1-T(E)
- - - - - - - - - - -
----------
-- -- --
------
--
--
--
--
--
--
-- --
--
--
-- --
-- --
-- --
--
--------
--
--
--
--
--
--
----
-- --
-- --
----
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
LEGEND (SHEETS E-57, E-58, E-59 ONLY):
6P,6,OLA
3P,3
OLC,2,2P
4P,4
6P,6
RUN THROUGH NEW CONDUIT TO NEW CONTROLLER CABINET.
TO Exist FIBER OPTIC NETWORK. Exist FO CABLE COILED WITHIN.
E-59
MODIFYING EXISTING ELECTRICAL SYSTEM
LOCATION 3 (SHEET 3 OF 3)
SIGNAL AND LIGHTING SYSTEM
165W (E)
165W (E)
165W (E)2-3" 2-4" 2-3"
3,3P
ETHERNET SWITCH. TERMINATE 6-SMFO CABLE IN FDU.
2070E CONTROLLER AND BBS CABINET. INSTALL CONTRACTOR FURNISHED INSTALL 332L CONTROLLER CABINET WITH DEPARTMENT-FURNISHED
RICHLAND
ROUTE 58
1-A (6')(E)
4#18
702Ker06
BAKERSFIELD, CALIFORNIA 93301
1600 TRUXTUN AVENUE
CITY OF BAKERSFIELD
ELECTRICAL
REGISTERED ELECTRICAL ENGINEER
PASADENA, CALIFORNIA 91124
100 WEST WALNUT STREET
PARSONS
MATTHEW BRASH
x
x
x
x
x
Dist COUNTY ROUTE POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
LAST REVISION
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
No.
Exp.
R
E
G
I
S
T
E
R
E
D
PROFESSIONAL
E
N
G
I
N
E
E
R
STATE OF CALIFORNIA
TIME PLOTTED =>
DATE PLOTTED =>
$TIME
$DATE
CHECKED BY
DESIGNED BY
CALCULATED- REVISED BY
DATE REVISED
PLANS APPROVAL DATE
DATE
CONSULTANT FUNCTIONAL SUPERVISOR
R
COPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
OR AGENTS SHALL NOT BE RESPONSIBLE FOR
THE STATE OF CALIFORNIA OR ITS OFFICERS
R
03-09-18
USERNAME => $USER
DGN FILE => $REQUEST
RELATIVE BORDER SCALE
IS IN INCHES
0 1 2 3
UNIT 1477 PROJECT NUMBER & PHASE 0600000484BORDER LAST REVISED 7/2/2010 99 58
22.7/23.8
R50.5/R55.5
DALE WILSON
MARIAM HABBOUSH
WILSON
DALE J.
13750
06/30/19
1464
10/10/18
10/10/18
171
3 3