CITY OF BAKERSFIELD
Thomas Roads Improvement Program
SHEET 1 OF 1
CONTRACT NO. P.O. NO.

PROJECT:

FEDERAL NO. (S)

CONTRACTOR: Security Paving Company
ADDRESS: 2915 Fairhaven Drive
Bakersfield, CA 93309

YOU ARE HEREBY DIRECTED TO MAKE THE HEREIN DESCRIBED CHANGES FROM THE PLANS AND SPECIFICATIONS OR DO THE FOLLOWING WORK DESCRIBED NOT INCLUDED IN THE PLANS AND SPECIFICATIONS ON THIS CONTRACT.

NOTE: This change order is not effective until approved by City Council or City Engineer CHANGE SUBMITTED BY: Arturo Infante, Construction Manager DATE: 6/15/2025 CHANGE REQUESTED BY: Arturo Infante, Construction Manager DATE: 6/15/2025 ACCOUNT NO (S) 122-4021-825.80-41 TRCC21
127-4021-825.80-41 TRCC21 INCREASE $25,000.00
335-4021-825.80-41 TRCC21 DECREASE $0.00
By reason of this order the time of City Council Approval Required YES X completion will be adjusted as follows: NO ADJUSTMENT NO Approved As to Form: CITY ATTORNEY Approved by the Council of City of Bakersfield Approval Recommended: City Engineer Mayor
Countersigned: Finance Director Date
Contractor: Title:Accepted, Date:

We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above.

CONTRACT CHANGE ORDER
Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work of contract price, agreed price and force account.

Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 19-069 175
NCIIPL-5109(251)
CHANGE ORDER NO.

Centennial Corridor MAINLINE
In accordance with section 4-1.05, "Changes and Extra Work", of the Standard Specifications, provide labor, equipment and materials as necessary to perform the following work:

Extra Work at Force Account:

At Stations 71+05 and 73+85, CN4 alignment, install and maintain two light towers while the new foundations for the permanent light standards are being redesigned and constructed.

Provide labor, equipments and materials as necessary to perform this work. The Contrator will be compensated for the actual costs. Contractor will submit invoices and extra work tickets in accordance with Section 9-1.04C of the Std Specs.

Labor, materials, and equipment, as approved by the Engineer, will be paid for in accordance with the provisions in Section 9-1.04, “Force Account” of the Standard Specifications.

All work shall be done in accordance with the attached revised plans, Special Provisions, Standard Plans and Specifications and as directed by the Engineer.

Extra Work at Force Account = $25,000.00
TIME ADJUSTMENT:

NO ADJUSTMENT

UNILATERAL