AMENDMENT #2 TO AGREEMENT NO. 2023-101
M:\Advanced Project Delivery\Projects\FY 2022-2023\T3K324 - Monitor St Corridor Improvements (SRTS)\Consultants\Kimley- Horn\Monitor 100%\Amendment No.2 to Agmt 2023-101 KH.doc -- Page 1 of 4 Pages --
AGREEMENT NO.
AMENDMENT NO. TWO TO
AGREEMENT NO. __2023-101__
THIS AMENDMENT NO. TWO TO AGREEMENT NO. 2023-101 is made and entered into on ________________, by and between the CITY OF BAKERSFIELD, a charter c ity and a municipal corporation (referred to herein as “CITY”), and KIMLEY HORN AND ASSOCIATES, INC., a Corporation authorized to do business in California (referred to herein as “DESIGN CONSULTANT”).
R E C I T A L S
WHEREAS, on April 26, 202 3, CITY and DESIGN CONSULTANT entered into Agreement No. 2023- 101 in the amount of Four Hundred Forty-Eight Thousand, Nine Hundred Forty Dollars and Zero Cents ($448,940.00) wherein DESIGN CONSULTANT agreed to provide design services for the Safe Routes to Schools Improvement Project; and
WHEREAS, on May 08, 2024, CITY and DESIGN CONSULTANT entered into Amendment No. 1 to expand the scope of work, and increase Compensation in the amount of One Million, Five Hundred and Eighty Two Thousand, Eight Hundred Dollars and Zero Cents ($1,582,800.00), for a total compensation not-to- exceed Two Million, Thirty One Thousand, Seven Hundred Forty Dollars and Zero Cents ($2,031,740.00); and
WHEREAS, CITY and DESIGN CONSULTANT desire to enter Amendment No. 2 to alter the scope of work.
NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and DESIGN CONSULTANT mutually agree to amend Agreement No. 2023- 101 as follows:
1. Section 1 of Agreement No. 2023- 101 entitled “Scope of Work” is hereby amended to read as follows:
1. SCOPE OF WORK. In exchange for the Compensation
(defined below), DESIGN CONSULTANT must competently and thoroughly design and engineer the Project as more specifically described in the Request , attached as Exhibit A and incorporated herein by reference, and in DESIGN CONSULTANT’s scope of work, attached hereto as Exhibit B, and in DESIGN CONSULTANT’S additional scope of work, attached hereto as Exhibit C and in DESIGN CONSULTANT’S alterations to the scope of work, attached hereto as Exhibit D and incorporated herein by this reference (collectively, the project description in the Request and DESIGN ____________________________________________________
AMENDMENT #2 TO AGREEMENT NO. 2023-101
M:\Advanced Project Delivery\Projects\FY 2022-2023\T3K324 - Monitor St Corridor Improvements (SRTS)\Consultants\Kimley- Horn\Monitor 100%\Amendment No.2 to Agmt 2023-101 KH.doc -- Page 2 of 4 Pages --
CONSULTANT’s scope of work are referred to as “Scope of Work”).
DESIGN CONSULTANT’s services shall include all the procedures necessary to properly complete the Scope of Work, whether specifically included in the Scope of Work or not.
2. Except as amended herein, all other provisions of Agreement No. 2023- 101 shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. Two to Agreement No. 2023- 101 to be executed the day and year first above written.
____________________________________________________
AMENDMENT #2 TO AGREEMENT NO. 2023-101
M:\Advanced Project Delivery\Projects\FY 2022-2023\T3K324 - Monitor St Corridor Improvements (SRTS)\Consultants\Kimley- Horn\Monitor 100%\Amendment No.2 to Agmt 2023-101 KH.doc -- Page 4 of 4 Pages --
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By:
ASHLEY ZAMBRANO
Deputy District Attorney
Insurance: __________
COUNTERSIGNED:
By:
RANDY MCKEEGAN
Finance Director
Attachments: Exhibits A, B, C, and D
Exhibit A: RFP
Scope of Work for Original Agreement
Kimley>>>Horn Page 2
The existing conditions present many notable challenges. The wide streets and travel lanes promote higher speeds and create long crossing distances for people walking, while the continuous parking lanes can reduce visibility of people, especially children, attempting to cross the streets. The signalized intersections are spaced ½ mile apart, creating long stretches of the corridor where no crossings of Monitor Street are provided. The lack of landscaping, particularly trees, reduce appeal and the appetite for walkability while also creating heat islands due to the lack of shade. In addition, the existing shared parking and bike lane with no bike lane striping or buffer for long stretches of the corridor might reduce bicyclists' sense of comfort and perceived safety and increase the risk of "dooring" from parked vehicles.
Vision
The following schools are located along, or within a block radius of, Monitor Street, and fall within the Kern High School District (KHSD) and the Greenfield Union School District (GFUSD). • South High School (KHSD)
• Prosperity Elementary School (GFUSD)
• Greenfield Middle School (GFUSD)
• Greenfield Community School (GFUSD)
• Palla Raffaello Elementary School (GFUSD)
• Valle Verde Elementary School (GFUSD)
• Leon H. Ollivier Middle School (GFUSD)
• Horizon Elementary School (GFUSD)
• Golden Valley High School (KHSD)
The vision for the Project is to transform Monitor Street into a safer corridor for all users, including the most vulnerable - school-aged students, by implementing improvements such as traffic calming, enhanced pedestrian crossings, improved signage and lighting, more resilient pavement markings, ADA modifications, median modifications, and sidewalk improvements.
Project Understanding
The City seeks to complete preliminary studies and create conceptual designs for improvements along the Monitor Street Corridor with the goal of approval and presentation of the developed concepts, to then identify potential grant funding opportunities for construction. This constitutes Phase 1 of the Project. Phase 1 will aim to scope Phase 2 of the Project which will include completing the environmental document and final design to prepare the Project for the Construction Phase.
The scope of services provided by Kimley-Hom for Phase 1 (outlined below) is intended to support the design alternatives analysis and anticipated grant application process. Since community engagement and stakeholder input is an important component of any grant application, the scope includes updating the community/stakeholders on the project and soliciting input on the needs and proposed improvements.
In addition, the City is seeking support on its ongoing pavement rehabilitation program. This support comprises of signing and striping plans required to incorporate any modification to existing lane configurations at the time of pavement rehabilitation on select roadway segments. -------, l kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 CO\i�i�'CiO' ·1 CQPY
--
ID Tas Task Name
No.
NOTICE TO PROCEED
PROJECT KICK-OFF MEETING
1 DATA COUfCTlON & EVALUATION OF
EXISTING CONDmONS
1.1 Data Collection
1.2 Development of Base Map
6 1.3 Field Review
2 AERIAL SURVEY
8 Drone Flight
Prepare Survey & ROW Base
10 3 UTILITY COORDINATION
11 Utility A Letters
12 Utility Base Mapping
13 4 COMMUNITY ENGAGEMENT
14 .1 Online Public Engagement Tool
15 .2 Stakeholder/Community Meeting
16 5 PRELIMINARY ENGINEERING
17 5.1 Studies and Assessment
18 Develop Initial Assessment
19 City Review
20 Final Assessment
21 5.2 Concept Alternatives
22 Develop Early Concept Layouts
23 City Review
24 Concept Review Meeting
2S Final Concepts
26 Selection of Preferred Alternative
27 5.3 30% Design
28 Draft 30% Design
29 City Review
30 Final 30% Design
31 5.4 Environmental Screening
32 6 ASSESSMENT OF GRANT FUNDING
33 7 PAVEMENT REHAB PLAN SUPPORT
34 8 PROJECT MANAGEMENT, COORDINATION,
AND ADMINISTRATION
Projtct Monitor Strut Schtdule Task
Cate: Thu 4/6/2.3
\
8 n ::"l
� �.: , ' ,- -· 0 \\ JJ
,__,,... .. -�
City of Bakersfield
Monitor Complete Streets • Phase 1
Duration Start Finish Predecessors !Jan '24 IF•b' 4
17 24 31 7 14 1 4 11
0 days Mon 5/1/23 Mon 5/1/23
0 days Mon 5/8/23 Mon 5/8/23 1FS+6 days
35 days Tue 5/9/23 Mon 6/26/23
20 days Tue 5/9/23 Mon 6/5/23 2
15 days Tue 6/6/23 Mon 6/26/23 4
Odays Mon 6/26/23 Mon 6/26/23 5 6/26
100 days Thu 8/6/20 Wed 12/23/20
O days Mon 5/15/23 Mon 5/15/23 2FS+S days � S/1S
15 days Tue 5/16/23 Mon 6/5/23 8
100 days Thu 8/6/20 Wed 12/23/20
20 days Tue 5/9/23 Mon 6/5/23 2
40 days Tue 6/6/23 Mon 7/31/23 11,9
70 days Tue 6/27/23 Mon 10/2/23
70 days Tue 6/27/23 Mon 10/2/23 6
Odays Mon 10/2/23 Mon 10/2/23 22FF+l0 days
175 days Tue 6/6/23 Mon 2/S/24
75 days Tue 6/6/23 Mon 9/18/23
SO days Tue 6/6/23 MonS/14/23 4
10 days Tue 8/15/23 Mon 8/28/23 18
lS days Tue 8/29/23 Mon 9/18/23 19
65 days Tue 8/8/23 Mon 11/6/23
30 days Tue 8/8/23 Mon 9/18/23 17FF,5,9,12
10 days Tue 9/19/23 Mon 10/2/23 22
Odays Mon 10/9/23 Mon 10/9/23 23FS+S days 10/9
15 days Tue 10/10/23 Mon 10/30/23 24
0 days Mon 11/6/23 Mon 11/6/23 25FS+S days,14,l 11/6
65 days Tue 11/7/23 Mon 2/5/24
30 days Tue 11/7/23 Mon 12/18/23 26,14,15
4w ks Tue 12/19/23 Mon 1/15/24 28
15 days Tue 1/16/24 Mon 2/5/24 29
lOdays Tue 1/23/24 Mon 2/5/24 27FF
25 days Tue 1/2/24 Mon 2/5/24 27FF
200 days Mon S/1/23 Fri 2/2/24
200days Mon 5/1/23 Fri 2/2/24
M1ltstone • Summ•ry �ad1ine ♦ Progttss Cntial P•th
kimley-horn.com 660 South Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040 April 19, 2024
Gavin Grimes
Civil Engineer III – Advanced Project Delivery
City of Bakersfield
1501 Truxton Avenue
Bakersfield, CA 93301
Cc: Mr. Gregg Strakaluse, Public Works Director
Mr. Paul Archer, Civil Engineer IV
RE: Proposal to Complete Final Design for the Monitor Street School Corridor Active Transportation Improvements Project – Phase 2
Dear Mr. Grimes:
Kimley-Horn and Associates, Inc. (Kimley-Horn or “the Consultant”) is pleased to submit this letter amendment proposal (the “Amendment”) to the City of Bakersfield (the “City” or “Client”) to complete final design for the Monitor Street School Corridor Active Transportation Improvements Project (the “Project”). Our understanding, scope of services, schedule, and fee to perform these services are included below.
BACKGROUND
The City provided a Notice to Proceed to Kimley-Horn on May 4 th, 2023 to complete Phase 1 of the Project. The purpose of Phase 1 was to develop and study various alternatives with the goal of selecting a locally preferred alternative based on City and community input to move forward with into final design.
To support the preliminary engineering designs for the alternatives, Kimley-Horn completed aerial mapping, utility coordination and base mapping, traffic counts and operational analysis, and community engagement. Kimley-Horn developed two alternatives, which were submitted to the City on January 19, 2024 for review and input. The key improvement features contained in those alternatives include raised medians, buffered bike lanes on both sides of Monitor Street, protected intersections, bus bays, existing signal modifications, street and pedestrian lighting, and shade trees. The first alternative maintains existing parking along the corridor, while the second alternative prioritizes additional buffer islands and tree planting for shade of the bike lanes and pedestrian walkways.
The City is in the process of selecting a preferred alternative and will be applying for the 2025 Active Transportation Program (ATP) Cycle 7 (anticipated call for projects – Thursday, March 21, 2024) to receive grant funding for the project’s construction, the proposal for which is included in this amendment.
PROJECT UNDERSTANDING
With Phase 1 nearing completion, the City has requested Kimley-Horn to provide a proposal for the completion of Phase 2 of the Project. Phase 2 will include the completion of design topographic ground surveys and right of way engineering, utility coordination, grant support, completion of the Environmental Document and supporting technical studies, and preparation of final design construction documents.
Exhibit C: Expanded Scope of Work for Amendment 1
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040 Since the City will be applying for the ATP grant funds, both the California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) documents are anticipated to be required.
Since the project proposes bike and pedestrian improvements, it may qualify for a Statutory Exemption (SE) under CEQA per SB 922. SE applies to projects that fall under a certain definition, regardless of the project’s potential impacts to the environment. If a project is statutorily exempt from CEQA it requires no further environmental review. In addition to project category type, there are also other stipulations that need to be met in qualify for the SE such as no right-of-way (ROW) impacts. Alternately a Categorial Exemption (CE) can be applied for under CEQA. It is anticipated that the City will prepare the CEQA SE or CE, and Kimley-Horn will complete the activities required by Caltrans for NEPA. It is anticipated a Categorical Exclusion will be the appropriate level of NEPA documentation. A Preliminary Environmental Study (PES) form is required by Caltrans to scope the NEPA document and required technical studies. Since Caltrans will typically not process a PES form until a federal ID number has been awarded to the Project, the Kimley-Horn team recommends holding off on advancing any NEPA tasks until federal funding is identified.
Kimley-Horn will assist the City with the preparation of one grant application for ATP Cycle 7 Large Infrastructure Projects as provided by the Caltrans Division of Local Assistance (DLA). The grant application will be prepared in a manner consistent with the Caltrans published guidelines at the time of the development of this Scope of Services. The preparation of this grant application will require input, both qualitative and quantitative, from the City.
Kimley-Horn will provide the services specifically set forth below to complete Phase 2 of the Project.
SCOPE OF SERVICES
Task 1: ATP Cycle 7 Grant Application Preparation
Task 1.1 Data Requests
Kimley-Horn shall be entitled to rely on the completeness and accuracy of all information provided by the City. The City shall provide all information requested by Kimley-Horn during the project including but not limited to the following:
l GIS shapefiles for relevant active transportation infrastructure (existing and proposed) l Relevant planning documents and associated materials
Task 1.2 Define the Project and Compare to Grant Criteria Kimley-Horn will perform the following as part of this sub-task:
l Draft the Project Descriptions – We will prepare/update the project description based on discussion with the City. The project description will form the basis for the grant application. l California Transportation Commission (CTC) Virtual Site Visit – Kimley-Horn will prepare all materials and presentation for a virtual site visit with CTC to discuss the application. l Site Visit – Kimley-Horn will conduct one site visit to review the project area and take updated photographs specifically for the application, where needed.
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040 l Preliminary Scoring – Kimley-Horn will prepare a preliminary score for the ATP project based on the ATP Cycle 7 scoring guidelines.
► Deliverables: Materials for CTC Virtual Site Visit, and Preliminary Scoring Task 1.3 Prepare and Submit Grant Application
While Kimley-Horn will use any materials already prepared as part of Phase 1, certain figures, graphics and support items (as listed below) need to be created per ATP checklist requirements. Kimley-Horn will perform the following as part of this sub-task:
l Draft Figures – Kimley-Horn will gather and update draft exhibits, figures, and graphics for the applications:
n Vicinity Map/Location Map: Create project exhibits to agency borders and project limits n Project Layout Plan/Map: Create project exhibits per ATP checklist requirements A-D n Typical Cross-Sections: Create existing and proposed cross sections per ATP checklist requirements A and B
n Detailed Engineer’s Estimate: Generate opinion of probable costs per ATP checklist instructions and per Attachment F
n Crash/Safety Data, Collision Maps and Countermeasures: Compile information and create exhibits
n Project Schedule and Requested programming of ATP funding: Prepare project schedule and assist City with funding requests
n Warrant Studies/Guidance
n Additional Narration and Documentation: Create text provided in “narrative questions” and supplement with documentation of engineering decisions
l City Review – City will have ten (10) business days to review the figures as part of the grant review and submit comments and edits to Kimley-Horn.
l Conservation Corps – Kimley-Horn will coordinate with the Local and State Conservation Corps for the ATP applications to obtain participation and commitment (up to 3 hours). l Stakeholder Outreach – Kimley-Horn will prepare a template for Letters of Support (LOS). City will solicit stakeholders to sign LOS. Kimley-Horn will compile completed LOS for application.
Further, Kimley-Horn will work with the City to coordinate with schools/districts and walking group to incorporate input received as part of Phase 1. l Draft Grant Application – Kimley-Horn will prepare one draft ATP grant application for City review. The grant application will be based on the latest ATP scoring criteria and will also take into consideration the regional scoring criteria.
l City Review (5 days) – the City will have five business days to review the draft grant applications and to submit comments to Kimley-Horn.
l Final Grant Application – Kimley-Horn will incorporate the City comments and prepare the final application.
l Regional Supplement – Kimley-Horn will prepare and submit one hard copy and electronic file of the regional supplement as requested by Kern Council of Governments (Kern COG) in order to be eligible for MPO funds (up to 12 hours are assumed for this sub-task).
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040 ► Deliverables: Draft and Final Grant Application to City/Caltrans, and Regional Supplement to Kern COG
Task 2: Engineering Survey
Aerial mapping was obtained during Phase 1. Topographic ground surveys and ROW mapping are intended to supplement the aerial mapping completed during Phase 1 to support the final design.
Task 2.1 Topographic and Right-of-Way Mapping
The Kimley-Horn team will survey a 50-foot grid street cross-section of Monitor Street, 100-feet past intersecting streets, and will capture surface features from back of walk to back of walk. It is assumed survey outside of the public right-of-way is not required.
The Kimley-Horn team will survey street centerline monuments and ties to be used for the establishment of the existing right-of-way limits from found monuments based on City and County records maps and documents. Property lines will be shown per record only. ► Deliverables: Updated AutoCAD base map with high-resolution photo, surface TIN, and surrounding parcel data from Kern County Assessor’s GIS data Task 3 – Environmental Documentation
Phase 1 included an environmental screening to scope the anticipated level of environmental documentation. Based on the pedestrian and bicycle safety improvements proposed within existing City right-of-way, a CE/CE is anticipated. It is assumed that the City will prepare any technical studies required for CEQA, and will prepare the CEQA notice of exemption (NOE).
The City will be applying for ATP Cycle 7 grant funds for the construction of the Project. The ATP is funded with both State and Federal funds. Therefore, if federal dollars are allocated to the Project, NEPA clearance will be required. Tasks 3.2 and 3.3 will be initiated only if federal funding is received for the Project.
Task 3.1 – Project Description
The Project Description is a critical component because it is the basis for the environmental analysis.
The Kimley-Horn team will prepare a draft Project Description to be used for both CEQA and NEPA, for City review and approval. The Project Description will detail the Project’s Purpose and Need, location, environmental setting, Project components, construction schedule/phasing, and discretionary actions. Exhibits will be prepared to depict the regional and site vicinity and key project components as well as the Environmental Study Limits (ESL) and Area of Potential Effect (APE). We will respond to one reconciled set of comments on the draft Project Description. We will repurpose the Project Description drafted for the CEQA for NEPA in close coordination with City staff. ► Deliverable: Draft and Final Project Description
Optional Task 3.2 – NEPA PES Form
Caltrans will require the City to complete a Preliminary Environmental Study (PES) form. This scope
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040 includes preparation of a PES form (Chapter 6 Local Assistance Procedures Manual). We will respond to one set of consolidated comments from the City on the PES. We will revise the PES and resubmit in tracked changes for City approval. We will address final City comments and provide the PES for Caltrans submittal. We will coordinate with Caltrans to provide requested additional technical studies and Caltrans will finalize and complete the NEPA CE.
► Deliverables: Draft and Final PES Form
Optional Task 3.3 – NEPA CE
This scope assumes Caltrans will be the lead agency for NEPA. NEPA requires federal agencies to disclose to decisionmakers and the interested public a clear, accurate description of the potential environmental impacts of proposed federal actions and the reasonable alternatives to those actions.
Consistent with 23 CFR 771.117(d), Caltrans will likely use a NEPA categorical exclusion for environmental clearance. The D list (e.g., Section 771.117[d]) of categorical exclusions require additional actions prior to approval. Potential categorical exclusion categories include D.1 (modernization) and/or D.2 (highway safety improvements).
To support the NEPA CE, Kimley-Horn will draft a Mitigation Memorandum, documenting the standard Caltrans Avoidance and Minimization Measures (AMMs) that the project would incorporate. Kimley- Horn will revise the draft and prepare a final Mitigation Memorandum based on one (1) round of consolidated comments. It is understood that there will not be property acquisition requirements for the project, and that no real property takes would occur. As such, this scope assumes that no Community Impact Assessment would be required.
It is our understanding that there are no impacts to jurisdictional water features within the proposed project footprint, nor are there areas of habitat for species of concern. As such, it is not anticipated that regulatory permits (e.g. ACOE, RWQCB, CDFW) would be required.
Task 4 – Utility Coordination
Task 4.1 Utility B & C Letters
The Kimley-Horn team will prepare utility ‘B’ letters to reflect the proposed improvements and to verify the locations of facilities as incorporated into the base mapping. Potential conflicts will be identified, and follow-up phone conversations will be conducted to resolve the conflicts or to coordinate relocation requirements.
The team will prepare utility ‘C’ letters to reflect the final notification to utility owners that relocation or services are required and to coordinate the final utility contract documents. ► Deliverables: Utility B Letters; Utility C Letters; and Utility Conflict Matrix Task 4.2 Field Review and Base Map Updates
The Kimley-Horn team will visit the site to review and record visible, above-ground existing conditions with plans in hand. Existing utilities, drainage facilities, fencing and other improvements, etc. shall be
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040 noted and compared with the topographic mapping and utility base mapping prepared in Phase 1 and revised in Phase 2. The base map will be updated to reflect items identified in the field review.
Optional Task 4.3 Utility Certification
If the Project is successful in receiving grant funding, Utility Certification will be required by Caltrans before funds can be allocated for construction. The Kimley-Horn team will prepare the required utility and ROW certification documentation to receive approval from Caltrans. This includes up to one meeting with Caltrans local assistance to review ROW and utility certification documents. ► Deliverables: Caltrans Form 13-B ROW Certification Form, Utility Liability Forms, and Form 14D Utility Notices
Task 5 – Plans, Specifications, and Estimate (PS&E)
Task 5.1 Drainage Study
The Kimley-Horn team will confirm existing drainage tributary areas contributing flows to the project limits, associated flow rates, and existing drainage facilities. The team will assess post improvement drainage areas/improvements, changes in flow rates, and impacts or modifications required for existing drainage facilities. The City of Bakersfield’s Engineering Design Manual Division Three Drainage will be used to complete the hydrological analysis.
It is assumed that the Project will maintain existing drainage patterns. A hydraulic analysis following the City of Bakersfield standards will be completed to size proposed catch basins and laterals. Because the project aims to decrease the impervious area within the project limits, an in-depth hydraulic analysis of the existing inlets and storm drain system is not included. Main line relocations or modifications are not anticipated or included, and relocation of other major utilities to accommodate the storm drain modifications are not anticipated to be required. Permanent Best Management Practices (BMPs) or stormwater treatment is not anticipated to be required.
A Draft Drainage Study will be submitted with the 60% PS&E package. One consolidated round of comments from the City is anticipated on the Draft Drainage Study. These comments will be incorporated into the Final Drainage Study for inclusion with the 90% PS&E package. ► Deliverables: One (1) Copy of the Draft and Final Drainage Study Memorandum Task 5.2 –60% PS&E
The Kimley-Horn team will produce and submit 60% plans, specifications outline, estimates, and the Draft Drainage Study for review and comment from the City.
Street Improvement plans will include sidewalk, roadway, curb extensions, and median improvements and include plan and profile views, existing right-of-way, centerline, join line, curb and gutter, flow line, top of curb, back of sidewalk, etc. for the improvements. Drainage improvements, construction details, and bus stop relocations will each be shown on their own sheets. Any potential utility conflicts will be confirmed and identified in the plans and coordinated with the various utility companies. It is assumed
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040 that utility potholing will not be required. If utility potholing is identified as being required, Kimley-Horn will notify the City and prepare a scope and fee for the anticipated effort.
Construction detail sheets will be provided for each intersection to detail the curb ramp grading. It is assumed that details required for the construction of the buffer islands will be provided on the street improvement plans.
Traffic signal modification plans will be prepared for upgrades to six (6) existing signalized intersections in accordance with City design guidelines to show the proposed signal modification including proposed signal poles and other new signal equipment or cabinet modifications. In addition, Kimley-Horn will prepare Rectangular Rapid Flashing Beacon (RRFB) design plans for two (2) new pedestrian crossings to show the proposed control. It is assumed a new interconnect system, or modifications to any existing interconnect system, will not be required. It is assumed that traffic control plans will be prepared by the contractor.
The team will review the readily available as-built plans of the existing lighting system and coordinate with the City on preparing and processing the permanent street lighting and photometric design plans.
Per the City’s GIS website, it appears existing streetlights are only at intersections. Based on the photometric analysis and the City of Bakersfield street lighting design standards, we will determine the number of new streetlights or pedestrian lights that would need to be added. It is assumed that all coordination regarding service points will be conducted by the City.
Landscaping plans will consist of street tree planting and hardscape improvements. Trees will be planted in existing landscape parkways per City Standards, and un-stabilized decomposed granite can be proposed at curb extensions for non-walkable surface areas as an alternative to planting. Street trees will be chosen based on the City’s Street Tree recommendation list and the species’ ability to grow a full canopy quickly to reduce the Heat Island Effect. Tree selection will be a collaborative process with City Staff based in previous experience and maintenance considerations. Proposed irrigation is not assumed to be required. Kimley-Horn will coordinate with the City to discuss current approach to tree watering.
Plans will be prepared in AutoCAD Civil 3D format and will be submitted to the City for review and approval. The following plans are anticipated for inclusion in the final bid set:
· Title Sheet 1 Sheet
· General Notes 1 Sheet
· Typical Sections 2 Sheets
· Survey Control Sheets 23 Sheets at 1” = 40’
· Demolition & Utility Plans 23 Sheets at 1” = 40’
· Street Improvement Plans 45 Sheets at 1” = 40’
· Construction Details 30 Sheets at 1” = 10’
· Bus Stop Relocation Plans 10 Sheets at 1” = 10’
· Drainage Plans & Details 12 Sheets at 1” = 40’
· Lighting Plans & Details 25 Sheets at 1” = 40’
· Signing & Striping Plans 25 Sheets at 1” = 40’
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040 · Signal Plans 6 Sheets at 1” = 20’
· RRFB Plans 2 Sheets at 1” = 20’
· Landscape Plans & Details 35 Sheets at 1” = 40’
Total = 240 Sheets
An outline of the technical specifications sections to be included in the ultimate project specifications document (book format) will be prepared for the 60% submittal. The outline of the technical specifications will include special materials, products, and installation procedures not covered under the City’s Standard Boilerplate Specifications, or the most current Standard Specification for Public Works Construction.
The Preliminary Opinion of Probable Construction Costs will be provided to reflect the proposed improvements shown in the 60% Submittal Plans.
► Deliverables: One (1) Electronic Copy of the 60% Plans, Specifications, & Estimate Package Task 5.3 – 90% PS&E
The Kimley-Horn team will update the plans based on one set of consolidated comments provided by the City, and other reviewing agencies, on the 60% PS&E package. Kimley-Horn will prepare a 60% Comment Response Matrix to track all comments received and their outcomes. The Draft outline technical specifications and Preliminary Opinion of Probable Construction Costs will be updated to reflect the comments, changes, and proposed improvements shown in the 90% Submittal Plans.
Kimley-Horn will then submit 90% plans, technical specifications, estimates, and the final Drainage Study for review and comment from the City, and other reviewing agencies. ► Deliverables: One (1) Electronic Copy of the 90% Plans, Specifications, & Estimate Package including the 60% Response to Comments Matrix
Task 5.4 – 100% PS&E
The Kimley-Horn team will update the plans based on comments provided by the City, and other reviewing agencies, on the 90% PS&E package. Kimley-Horn will prepare a 90% Comment Response Matrix to track all comments received and their outcomes. The Final Specifications and Opinion of Probable Construction Costs will be updated to reflect the comments, changes, and proposed improvements shown in the 100% Submittal Plans.
Kimley-Horn will then submit 100% plans, specifications, and estimates for review by the City, and other reviewing agencies.
► Deliverables: One (1) Electronic Copy of the 100% Plans, Specifications, & Estimate Package including the 90% Response to Comments Matrix
Task 6 – Project Management, Coordination, and Administration Kimley-Horn will provide project management for each task detailed in this scope of services, which is assumed to be 12 months from Notice to Proceed (NTP) to the completion of the scope of work.
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040 Management activities consist of attending meetings, creating, and updating of the project schedule, budget tracking, coordination with the City, Kimley-Horn team, and third-party agencies, developing and maintaining Project Information, quality assurance and project administration.
Task 6.1 - Meetings
Up to twelve (12) virtual monthly progress meetings between the Kimley-Horn Team and the City will be held to coordinate the project details. It is assumed that up to four (4) staff will attend each monthly meeting. These meetings will provide opportunities for Kimley-Horn to report upon the status of the project, coordinate activities, and review the schedule. ► Deliverables: Preparation of Meeting Agendas, and Meeting Notes for up to 12 meetings Task 6.2 – Schedule
A Critical Path Method (CPM) schedule will be prepared by Kimley-Horn. We will prepare an initial schedule within the first two weeks following the issuance of a notice to proceed. The schedule will include tasks, project milestone dates, and agency review periods for project submittals. The CPM schedule will be monitored during project performance. If schedule delays occur or appear likely, Kimley-Horn will advise the City of the situation and recommend corrective actions as appropriate. The schedule will be updated monthly, or as required, to reflect changes and progress on major milestones throughout the duration of the project.
► Deliverables: Schedule and Schedule Updates
Task 6.3 – Project Administration
Project files will be maintained for the duration of the project. Progress reports and billing statements will be prepared following the end of each month. Project expenditures will be tracked and reported for each major task element. This task includes the assistance with project correspondence, billings, and submittals.
► Deliverables: Up to 12 Monthly Progress Reports and Invoices Optional Task 6.4 – Funding Administration Support
If the Project is successful in receiving federal funding through the Active Transportation Program, Kimley-Horn will support the City in preparing required funding allocation, authorization, and documentation. It is assumed the City will take the lead on preparing the necessary documents to allocate and authorize funds, and Kimley-Horn will support in reviewing the prepared documents and provided any additional required information.
Task 7 – Bid and Construction Support
The Kimley-Horn team will provide support services for this Project during the bidding and construction phases including the following:
l Provide engineering assistance related to finalizing bid items, special provisions, and responses to contractor bid questions.
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040 l Review of contractor’s construction submittals for conformance with the contract documents l Review and respond to contractors’ Request for Information (RFI) l Create and maintain file directory to keep records of construction submittals and RFI correspondence
l Attend site visits as needed
l Prepare as-built plans per revisions by contractor
The Kimley-Horn team will complete Task 7 on a time and materials basis. A total of 84 hours are estimated to support the bid and construction support phases with an anticipated duration of 16 months.
If additional effort is required, the Kimley-Horn team will coordinate with City for additional funds to complete bid and construction support services.
ADDITIONAL SERVICES
Any services not specifically described in the above scope, as well as any changes in the scope the Client requests, will be considered Additional Services and will be performed at our then-current hourly rates.
FEE AND BILLING
Kimley-Horn will perform the services described in Tasks 1 through 8 in the Scope of Services for a time and materials basis for the total contract fee below:
LABOR TASKS
Task 1 – ATP Cycle 7 Grant Application
Task 2 – Engineering Survey
Task 3 – Environmental Documentation
Task 4 – Utility Coordination
Task 5 – PS&E
Task 6 – Project Management, Coordination, and Administration Task 7 – Bid and Construction Support
Expenses
Total without Optional Tasks
OPTIONAL TASKS
Task 3.2 – NEPA CE
Task 4.3 – Utility Certification
Task 6.4 –Funding Administration Support
Total with Optional Tasks
FEE
$41,700
$71,400
$8,600
$22,300
$1,306,300
$72,900
$21,000
$5,000
$1,549,200
$10,900
$11,000
$11,700
$1,582,800
SCHEDULE
We will provide these services according to a mutually agreed upon schedule. Our intention is to complete this scope of work within 12 months of receipt of Notice to Proceed and anticipated to completed by April 2025 in Phase 2 in preparation of the final bid set.
A draft Project schedule is attached to this proposal letter.
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040
CLOSURE
If you concur in all the foregoing and wish to direct us to proceed with the services, please return along with the appropriate contract documentation. This proposal is valid for sixty (60) days after the date of this letter.
We appreciate the opportunity to provide these services to you. Please contact us if you have any questions.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC
Sowmya Chandrasekhar, P.E., T.E., P.T.O.E. Nicole Dias, P.E.
Project Manager Contract Manager
P.E. No.: 83100 P.E. No.: 86490
cc: Hours and Budget Backup Summary
Draft Project Schedule
Task
No. Task Description
Lead Project
Manager
Assistant
Project
Manager
Project
Engineer Ill
Project
Engineer Il Sr. Engineer Sr. Engineer Project
Engineer Ill
Project
Engineer Il
Project
Engineer Il
Assistant
Project
Manager
Project
Engineer Ill
Project
Engineer Il Sr. Engineer Project
Engineer Il
Program
Manager Il
Technical
Editor
Billing Rate $290 $240 $220 $170 $285 $285 $220 $170 $170 $240 $220 $170 $285 $170 $170 $135 1 ATP Cycle 7 Grant Application 1 3 8 2 82 13 11 27 8 191 41,615$ 41,615 $ 41,615 $
1.1 Data Requests 51 24 21 3,820$ 3,820 $ 3,820 $
1.2 Define the Project and Compare to Grant Criteria 56 5 8 24 5,945$ 5,945 $ 5,945 $
1.3 Prepare and Submit Grant Application 8 8 22 16 26 66 146 31,850$ 31,850 $ 31,850 $ 2 Topographic Survey & ROW Mapping 42 1 4 20 4,720$ 66,660 $ 71,380 $ 71,380 $ 3 Environmental Documentation 10 19 14 22 24 89 19,360$ 19,360 $ 8,510 $
3.1 Project Description 51 4 4 6 10 39 8,510$ 8,510 $ 8,510 $
3.2 Optional - NEPA PES Form 33 8 8 14 36 7,590$ 7,590 $
3.3 Optional - NEPA CE Coordination 22 28 14 3,260$ 3,260 $ 4 Utility Coordination 28 40 75 8 8 159 33,310$ 33,310.00 $ 22,280 $
4.1 Utility B & C Letters 81 5 4 0 63 12,420$ 12,420.00 $ 12,420.00 $
4.2 Field Review 81 0 1 0 8 8 44 9,860$ 9,860.00 $ 9,860.00 $
4.3 Optional - Utility Certification 12 15 25 52 11,030$ 11,030 $ 5 PS&E 98 86 1305 2920 90 435 950 130 880 31 6925 1,306,245$ 1,306,245 $ 1,306,245 $
5.1 Drainage Study 5 10 45 160 1 221 41,085$ 41,085 $ 41,085 $
5.2 60% PS&E 45 32 620 1280 40 200 460 60 460 10 3207 604,980$ 604,980 $ 604,980 $
5.3 90% PS&E 30 24 380 900 30 145 330 50 280 10 2179 410,810$ 410,810 $ 410,810 $
5.4 100% PS&E 18 20 260 580 20 90 160 20 140 10 1318 249,370$ 249,370 $ 249,370 $ 6 Project Management, Coordination, & Administration 86 24 24 104 12 24 24 24 15 337 84,505$ 84,505 $ 72,810 $
6.1 Meetings (Monthly Progress mtgs) 24 24 12 36 12 24 24 156 38,400$ 38,400 $ 38,400 $
6.2 Schedule 18 12 30 8,640$ 8,640 $ 8,640 $
6.3 Project Administration 24 46 24 12 106 25,770$ 25,770 $ 25,770 $
6.4 Optional - Funding Support 20 12 10 34 5 11,695$ 11,695 $ 7 Bid & Construction Support 26 24 10 10 14 48 8 20,990$ 20,990 $ 20,990 $ 265 112 1434 3005 240 33 504 12 1060 14 22 24 130 880 24 50 7809 $76,850 $26,880 $315,480 $510,850 $68,400 $9,405 $110,880 $2,040 $180,200 $3,360 $4,840 $4,080 $37,050 $149,600 $4,080 $6,750 1,510,745$ 66,660 $ 1,577,405$ 1,543,830 $ 5,000.00$ 5,000.00 $
1,582,405$ 1,548,830 $
Expenses
Total Task Fee
w/ Optional
Tasks
Total Task Fee
w/o Optional
Tasks
TOTAL PROJECT COSTS
Kimley
Horn
Total
Hours
Kimley-Horn
Total Cost
KSI
Survey
TOTAL HOURS (includes Optional Tasks)
Subtotal Labor (includes optional tasks)
Not-to-Exceed Fee Estimate
City of Bakersfield
Monitor Complete Streets Project - Phase 2
Roadway Traffic SupportEnv LA
ID Task
No.
Task Name Duration Start Finish Predecessors
1 NOTICE TO PROCEED 0 days Thu 5/4/23 Thu 5/4/23
2 PROJECT KICK-OFF MEETING 0 days Wed 5/24/23 Wed 5/24/23 1FS+6 days 3 1 DATA COLLECTION & EVALUATION OF
EXISTING CONDITIONS
88 days Wed 5/24/23 Fri 9/22/23
4 1.1 Data Collection 88 days Wed 5/24/23 Fri 9/22/23
5 Collect Existing Data 20 days Wed 5/24/23 Tue 6/20/23 2 6 Data Collection Summary Memo 19 days Tue 8/29/23 Fri 9/22/23 5,8,11,14,30 7 1.2 Development of Base Map 15 days Wed 6/21/23 Tue 7/11/23 5 8 1.3 Field Review 0 days Tue 8/22/23 Tue 8/22/23 7
9 2 AERIAL SURVEY 33 days Wed 5/24/23 Fri 7/7/23
10 Drone Flight 1 day Thu 6/15/23 Thu 6/15/23
11 Prepare Survey & ROW Base 33 days Wed 5/24/23 Fri 7/7/23 12 3 UTILITY COORDINATION 66 days Wed 5/24/23 Wed 8/23/23 13 Utility A Letters 38 days Wed 5/24/23 Fri 7/14/23 2
14 Utility Base Mapping 20 days Thu 7/27/23 Wed 8/23/23 13,11 15 4 COMMUNITY ENGAGEMENT 106 days Wed 7/12/23 Wed 12/6/23 16 4.1 Online Public Engagement Tool 68 days Wed 7/12/23 Fri 10/13/23 17 Draft Public Engagement Tool 22 days Wed 7/12/23 Thu 8/10/23 7 18 Post Public Coordinate Website 0 days Fri 9/1/23 Fri 9/1/23 17FS+16 days 19 Public Comment Push 30 days Mon 9/4/23 Fri 10/13/23 18 20 4.2 Stakeholder/Community Meeting 94 days Fri 7/28/23 Wed 12/6/23 21 Submit Stakeholder List 10 days Fri 7/28/23 Thu 8/10/23 17FF 22 Finalize Stakeholder List 31 days Fri 8/11/23 Fri 9/22/23 21 23 Determine Stakeholder Meeting
Date/Time
19 days Mon 9/25/23 Thu 10/19/23 22
24 Stakeholder Meeting 0 days Wed 10/25/23 Wed 10/25/23 23FS+4 days 25 Student Survey 5 days Mon 11/13/23 Fri 11/17/23 24FS+12 days 26 Community Meeting 0 days Wed 12/6/23 Wed 12/6/23 24FS+30 days,25 27 5 PRELIMINARY ENGINEERING 234 days Tue 8/1/23 Fri 6/21/24 28 5.1 Studies and Assessment 189 days Tue 8/1/23 Fri 4/19/24 29 Develop Initial Assessment 164 days Tue 8/1/23 Fri 3/15/24 30 Existing Conditions Assessment 20 days Tue 8/1/23 Mon 8/28/23 8FF+5 days,5 31 Proposed Conditions Assessment 10 days Mon 3/4/24 Fri 3/15/24 30,38 32 City Review 10 days Mon 3/18/24 Fri 3/29/24 29
33 Final Assessment 15 days Mon 4/1/24 Fri 4/19/24 32
34 5.2 Concept Alternatives 80 days Mon 11/6/23 Fri 2/23/24 35 Develop Early Concept Layouts 27 days Thu 12/7/23 Fri 1/12/24 7,11,14FF,19,30,24,26 36 City Review 15 days Mon 1/15/24 Fri 2/2/24 35
37 Concept Review Meeting 0 days Fri 2/9/24 Fri 2/9/24 36FS+5 days 38 Final Concepts 15 days Mon 2/12/24 Fri 3/1/24 37
39 Selection of Preferred Alternative 0 days Fri 3/8/24 Fri 3/8/24 38FS+5 days,16,20 40 5.3 30% Design 75 days Mon 3/11/24 Fri 6/21/24
41 Draft 30% Design 40 days Mon 3/11/24 Fri 5/3/24 39,16,20 42 City Review 4 wks Mon 5/6/24 Fri 5/31/24 41
43 Final 30% Design 15 days Mon 6/3/24 Fri 6/21/24 42
44 5.4 Environmental Screening 10 days Mon 6/10/24 Fri 6/21/24 40FF 45 7 PAVEMENT REHAB PLAN SUPPORT 224 days Thu 5/4/23 Tue 3/12/24 1 46 8 PROJECT MANAGEMENT, COORDINATION,
AND ADMINISTRATION
224 days Thu 5/4/23 Tue 3/12/24
50 51 PS&E Contract Approved at Council 0 days Wed 3/20/24 Wed 3/20/24 52 NOTICE TO PROCEED - Phase 2 0 days Tue 3/26/24 Tue 3/26/24 51FS+5 days 53 1 ATP (Cycle 7) Grant Application 146 days Fri 3/22/24 Fri 10/11/24 54 ATP Call for Projects 0 days Fri 3/22/24 Fri 3/22/24 39FF 55 Application Deadline 0 days Fri 6/21/24 Fri 6/21/24 54FS+61 days,44 56 ATP Grant Award Notifications 0 days Fri 10/11/24 Fri 10/11/24 55FS+80 days 57 2 ENGINEERING SURVEY 30 days Wed 4/10/24 Tue 5/21/24 58 Field Survey 10 days Wed 4/10/24 Tue 4/23/24 52FS+10 days 59 ROW & Base Mapping 20 days Wed 4/24/24 Tue 5/21/24 58 60 2 ENVIRONMENTAL DOCUMENTATION 213 days Wed 4/10/24 Fri 1/31/25 61 Project Description 10 days Wed 4/10/24 Tue 4/23/24 52FS+2 wks 62 CEQA CE - City to Complete 40 days Wed 4/24/24 Tue 6/18/24 61 63 NEPA CE 80 days Mon 10/14/24Fri 1/31/25
64 PES Form 40 days Mon 10/14/24 Fri 12/6/24 56
65 Caltrans Approves PES Form 20 days Mon 12/9/24 Fri 1/3/25 64 66 NEPA CE 40 days Mon 12/9/24 Fri 1/31/25 64
67 3 Utility Coordination 85 days Fri 10/18/24 Thu 2/13/25 68 3.1 Utility B Letters 15 days Fri 10/18/24 Thu 11/7/24 76,52 69 3.2 Utility C Letters 15 days Fri 1/24/25 Thu 2/13/25 68,80 70 3.3 Field Review 0 days Thu 11/7/24 Thu 11/7/24 68,76 71 4 PS&E 232 days Wed 5/22/24 Thu 4/10/25
72 4.1 Drainage Study 20 days Wed 5/22/24 Tue 6/18/24 59 73 4.2 60% PS&E 107 days Wed 5/22/24 Thu 10/17/24
74 60% PS&E 80 days Wed 5/22/24 Tue 9/10/24 59
75 City Review 4 wks Wed 9/11/24 Tue 10/8/24 74
76 Comment Resolution Meeting 0 days Thu 10/17/24 Thu 10/17/24 75FS+7 days 77 4.3 90% Design 77 days Wed 10/9/24 Thu 1/23/25
78 90% PS&E 50 days Wed 10/9/24 Tue 12/17/24 75
79 City Review 4 wks Wed 12/18/24 Tue 1/14/25 78
80 Comment Resolution Meeting 0 days Thu 1/23/25 Thu 1/23/25 79FS+7 days 81 4.4 100% PS&E 62 days Wed 1/15/25 Thu 4/10/25
82 100% PS&E 30 days Wed 1/15/25 Tue 2/25/25 69FF,79
83 City Review 4 wks Wed 2/26/25 Tue 3/25/25 82
84 Comment Resolution Meeting 0 days Thu 4/3/25 Thu 4/3/25 83FS+7 days 85 Final Bid Package 5 days Fri 4/4/25 Thu 4/10/25 62,66,84 86 5 PROJECT MANAGEMENT, COORDINATION,
AND ADMINISTRATION
270 days Wed 3/27/24 Tue 4/8/25
87 Meetings 270 days Wed 3/27/24 Tue 4/8/25 52
88 Schedule 270 days Wed 3/27/24 Tue 4/8/25 52
89 Project Administration 270 days Wed 3/27/24 Tue 4/8/25 52 90 6 BID AND CONSTRUCTION SUPPORT 360 days Fri 4/11/25 Thu 8/27/26 85 5/4
5/24
8/22
9/1
10/25
12/6
2/9
3/8
3/20
3/26
3/22
6/21
10/11
11/7
10/17
1/23
4/3
30 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 2 9 16 23 2 9 16 23 30 6 13 20 27 4 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25 Apr '25 May '25 Task Milestone
Summary
Deadline
Progress Critical Path
City of Bakersfield
Monitor Complete Streets - Phase 1
Project: Monitor Street Schedule
Date: Fri 3/1/24
kimley-horn.com 660 South Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040
June 11, 2025
Gavin Grimes
Civil Engineer III – Project Manager
City of Bakersfield
1501 Truxton Avenue
Bakersfield, CA 93301
Cc: Mr. Zac Meyer
Public Works Director
Paul Archer
Civil Engineer IV – Design Engineering
RE: Proposal to Complete Final Design for the Monitor Street School Corridor Active Transportation Improvements Project – Scope Amendment #2
Dear Mr. Grimes:
Kimley-Horn and Associates, Inc. (Kimley -Horn or “the Consultant”) is pleased to submit this letter amendment (the “Amendment”) to the City of Bakersfield (the “City” or “Client”) to amend the scope for the previously executed Monitor Street School Corridor Active Transportation Improvements Project (the “Project”) Agreement (the “Agreement”). The project corridor extends along the 3- mile stretch of Monitor Street from Merrimac Avenue to Astor Avenue (“Project Limits”). Our understanding of the scope of work adjustments are summarized below.
Background
Kimley-Horn submitted the 60% PS&E design package for the Project on November 15, 2024. The City provided comments on the 60% PS&E package on January 8 and 14, 2025, and Kimley-Horn had begun addressing comments and progressing the Project to 90% PS&E, originally targeted for March 2025. During the February 26, 2025 Project Development Team (PDT) meeting, the City directed Kimley-Horn to revise the design to incorporate raised bikeways on segments where there were densely spaced driveways and to convert all bus stops to turnouts.
Two alternatives were evaluated during the design process . The alternative selected by the City , Alternative 1, includes revised design features such as raised bikeways that provide a separated space for cyclists, enhancing safety and discouraging vehicle parking within the bikeway. These raised bikeways are proposed on select segments along both sides of Monitor Street between Berkshire Road and Fairview Road, specifically in areas with closely spaced driveways, and proposed to continue only along the west side of Monitor St reet from Fairview Road to Kyner Avenue. Attachment A illustrates the proposed raised bikeway improvements for the selected alternative design. In addition, all bus stops within the project limits — Monitor Street (Merrimac Avenue to Hosking Avenue) — will be modified to turnouts to support consistent traffic flow. The protected intersection design concept from the previous 60% plans will remain to minimize impacts on drainage and underground utilities.
Exhibit D: Additional Scope of Work for Amendment 2
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040
Kimley-Horn reviewed the revisions agreed upon with the City and summarized above, and provided an estimate of an additional $250-350k to revise the design and continue moving forward with the full Project scope. The City stated that there is no additional funding available for design revisions and requested that the Consultant develop a workplan to complete the updates within the remaining project budget.
Kimley-Horn has developed a revised- scope approach to complete the revisions and deliver 100% PS&E for a portion of the project corridor within the remaining budget. This approach includes updating and resubmitting the 60% PS&E design package to incorporate the design revisions stated above for the entire project corridor . The City is currently reapplying for funding from Congressman Valadao’s office to construct the northern segment of the corridor, from Pacheco Road to Merrimac Avenue, as an initial implementation phase to the Project (Implementation Phase 1). Kimley-Horn will advance this northern segment to 90% and 100% PS&E phases. The southern segment, south of Pacheco Road, will be shelved at the 60% design level and will be finalized as part of a future phase (Future Implementation Phase 2) once additional funding is acquired by the City.
Kimley-Horn will perform the services specifically set forth below.
Scope of Services
Task 5.2.1 – Revised 60% Plans and Estimates
This task will be added as a supplement to Task 5.2 of the original PS&E scope (submitted April 19, 2024).
The Kimley-Horn team will revise and resubmit the 60% Plans, Opinion of Probable Construction Cost (OPCC), and Draft Drainage Report based on the design revisions summarized above and agreed to at the April 18, 2025 PDT meeting, which include incorporating raised bikeways and converting all bus stops to turnouts for City review.
The street improvement plans will include sidewalks, roadway, curb extensions, and median improvements, with plan and profile views showing design elements such as existing right -of-way, centerline, joint line, curb and gutter, flow line, curb ramps, etc., for the improvements. The construction detail sheets will include curb ramp grading at intersections and bus stop relocations — buffer island details will be included on the street improvement plans. The storm drain plans will include catch basin modifications along the newly implemented raised bikeways.
The signing and striping plans will show pavement markings and signage layouts consistent with the updated roadway configuration. This includes lane assignments, bike lanes, crosswalks, legends, and other pavement markings. All signing and striping element s will be designed in accordance with both City of Bakersfield standards and the California Manual on Uniform Traffic Control Devices ( CA MUTCD), as applicable.
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040
The traffic signal plans will cover upgrades at six signalized intersections, including proposed signal poles and equipment, and Rectangular Rapid Flashing Beacon (RRFB) design plans for up to three unsignalized pedestrian crossings. It is assumed a new interconnect system, or modifications to any existing interconnect system, will not be required. It is assumed that traffic control plans will be prepared by the contractor. Traffic signal p lans will be revised based on the City’s comments and direction provided at the February 26, 2025 PDT meeting.
The lighting design will remain unchanged from the previous 60% submittal phase. No revisions are anticipated currently.
The landscaping plans will include street trees per City standards, with species selected through a collaborative effort with the City to promote canopy growth and heat reduction. The Kimley-Horn team will develop irrigation plans as part of the 90% and 100% submittals — these are not included in the revised 60% submittal.
Plans will be prepared in AutoCAD Civil 3D format and will be submitted to the City for review and approval. The following plans are anticipated for inclusion in the final bid set:
• Title Sheet 1 Sheet
• General Notes 1 Sheet
• Typical Sections 1 Sheet
• Survey Control Sheets 8 Sheets at 1” = 40’
• Demolition & Utility Plans 8 Sheets at 1” = 40’
• Street Improvement Plans 31 Sheets at 1” = 40’
• Construction Details 36 Sheets at 1” = 10’
• Storm Drain Plans 4 Sheets at 1” = 40’
• Signing & Striping Plans 10 Sheets at 1” = 40’
• Signal Plans 6 Sheets at 1” = 20’
• Lighting Plans & Details 1 Sheets at 1” = 20’
• Landscape Plans & Details 17 Sheets at 1” = 40’
Total = 124 Sheets
The preliminary OPCC will be provided to reflect the revised improvements shown in the revised 60% Submittal Plans.
Deliverables: One (1) Electronic Copy of the 60% Plans, OPCC & Draft Drainage Report Package
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040
Task 5.3 – 90% PS&E
This task will supersede and replace Task 5.3 of the original PS&E scope (submitted April 19, 2024) in its entirety.
The Kimley-Horn team will update the plans for the northern segment of the Monitor Street corridor, from the intersection at Pacheco Road to Merrimac Avenue (Implementation Phase 1) , based on comments provided by the City on the 60% PS&E package. Consistent with the Project Design Scope, Kimley-Horn will prepare a 60% Response to Comments Matrix to track all comments received and their resolutions. The 90% Submittal Plans, Specifications, and OPCC will reflect these updates, while the southern segment (south of Pacheco Road; Future Implementation Phase 2) will remain at the 60% design level.
It is noted that based on the comments received from the City on January 9, 2025, the City intends to update the lighting along the project corridor as follows: remove all wood poles and overhead feeds, remove all direct bury poles and replace with flange mount and foundations, add pedestals per City standards to eliminate #2 boxes from PG&E, up grade existing LED fixtures to current standard LED fixtures, and add additional lighting as needed throughout the project corridor. Many of the existing lights along Monitor Street between Pacheco Road and Merrimac Avenue are on wood poles and have short luminaire mast arms which do not sufficiently illuminate the roadway. For Implementation Phase 1, the lighting design will include removing and replacing existing streetlight to adequately illuminate the corridor.
Plans will be prepared in AutoCAD Civil 3D format and will be submitted to the City for review and approval. The following plans are anticipated for inclusion in the final bid set:
• Title Sheet 1 Sheet
• General Notes 1 Sheet
• Typical Sections 1 Sheet
• Survey Control Sheets 8 Sheets at 1” = 40’
• Demolition & Utility Plans 3 Sheets at 1” = 40’
• Street Improvement Plans 7 Sheets at 1” = 40’
• Construction Details 7 Sheets at 1” = 10’
• Storm Drain Plans 4 Sheets at 1” = 40’
• Signing & Striping Plans 5 Sheets at 1” = 40’
• Signal Plans 2 Sheets at 1” = 20’
• Lighting Plans & Details 12 Sheets at 1” = 20’
• Landscape Plans & Details 4 Sheet at 1” = 40’
• Irrigation Plans & Details 4 Sheets at 1” = 40’
Total = 59 Sheets
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040
The draft technical specifications to be included in the ultimate project specifications document (book format) will be prepared for the 90% submittal. The draft technical specifications will include special materials, products, and installation procedures not covered under the City’s Standard Boilerplate Specifications, or the most current Standard Specifications for Public Works Construction.
Kimley-Horn will then submit the 90% Submittal Plans, Specifications, OPCC, and Draft Final Drainage Report for review and comment from the City, and other reviewing agencies.
Deliverables: One (1) Electronic Copy of the Phase 1 90% Plans, Specifications, OPCC, and Draft Final Drainage Report Package including the 60% Response to Comments Matrix
Task 5.4 – 100% PS&E
This task will supersede and replace Task 5.4 of the original PS&E scope (submitted April 19, 2024) in its entirety.
The Kimley-Horn team will update the Implementation Phase 1 plans based on comments provided by the City on the 90% PS&E package. Consistent with the Project Design Scope, Kimley -Horn will prepare a 90% Response to Comments Matrix to track all comments received and their resolutions.
The Final Submittal Plans, Specifications, and OPCC will reflect these updates.
Kimley-Horn will then submit 100% Submittal Plans, Specifications, OPCC, and Final Drainage Report for review and comment from the City.
Deliverables: One (1) Electronic Copy of the Phase 1 100% Plans, Specifications, OPCC , & Final Drainage Report Package including the 90% Response to Comments Matrix
Additional Services
Any services not specifically described in the above scope, as well as any changes in the scope the City requests, will be considered Additional Services and will be performed at our then-current hourly rates.
Fee and Billing
Kimley-Horn will reallocate the remaining budget originally authorized for the preparation of the 90% and 100% PS&E submittals for the proposed scope of work outlined in this amendment request.
kimley-horn.com 660 S. Figueroa Street, Suite 2050, Los Angeles, CA 90017 213 261 4040
Schedule
Kimley-Horn understands that the City needs to expend the funds allocated for the ATP Project design by the end of this calendar year. Based on the scope of work outlined above, and anticipated authorization of this amendment, Kimley-Horn proposes the following revised schedule:
Receive Authorization of this Amendment 6/13/2025
Submit Revised 60% PS&E Package (Entire Project Corridor) 07/25/2025 City Provides Comments on Revised 60% PS&E Package 08/15/2025 Submit Implementation Phase 1 90% PS&E Package 10/10/2025 City Provides Comments on Implementation Phase 1 90% PS&E Package 10/31/2025 Submit Implementation Phase 1 100% PS&E Package 12/19/2025 Closure
We appreciate the opportunity to continue to partner with you on this exciting project. Please contact me if you have any questions.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
Sowmya Chandrasekhar, P.E., T.E., P.T.O.E. Nicole Dias, P.E.
Project Manager Contract Manager
P.E. No.: 83100 P.E. No.: 86490
5'BIKE PATH2'
45' 45'
(5')EX SIDEWALK9'PARKING11'SB TRAVEL LANE11'NB TRAVEL LANE9'PARKING2' 5'BIKE PATH5'PROP SIDEWALK(6')EX DWY11'MEDIAN/TURN POCKET2' BUFFER 2' BUFFER M
M
WW
E WW
EE S WW E
WW
S
EVETCTCWWWDYHW
A
A
MONITOR ST
11'9' 5'5'11'11'9'2'5'6'
45' 45'
2' 2'2'
MONITOR STREET SCHOOL CORRIDOR ATP - RAISED BIKE PATH SECTION A-A1" = 5' MONITOR STREET SCHOOL CORRIDOR ATP - RAISED BIKE PLAN VIEW1" = 10' ALTERNATIVE 1NORTH