SMALL PROJECT ANALYSIS LEVEL ASSESSMENT
Camino Media – University Square
Bakersfield, CA
Prepared For:
RGF Properties
9100 Ming Avenue, Suite 120
Bakersfield, CA 93311
Prepared By:
TRINITY CONSULTANTS
4900 California Avenue, Suite 420A
Bakersfield, CA 93309
(661) 282-2200
August 2021, revised May 2025
Project 210505.0147
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants i
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY 1-1
1.1 Executive Summary ................................ ................................ ................................ .. 1-1
1.2 Statement of Finding ................................ ................................ ................................ 1-1
2. PROJECT INFORMATION 2-1
2.1 Introduction ................................ ................................ ................................ .............. 2-1
2.2 Project Location ................................ ................................ ................................ ........ 2-1
3. SMALL PROJECT ANALYSIS LEVEL QUALIFICATION 3-1
4. AIR QUALITY IMPACTS THRESHOLDS AND EVALUATION METHODOLOGY 4-1
5. PROJECT-RELATED EMISSIONS 5-1
5.1 Short-Term Emissions ................................ ................................ ............................... 5-1
5.2 Long-Term Emissions ................................ ................................ ................................ 5-1
5.3 Potential Impact on Sensitive Receptors ................................ ................................ .. 5-2
5.4 Potential Impacts to Visibility to Nearby Class 1 Areas ................................ ............. 5-3
5.5 Potential Odor Impacts ................................ ................................ ............................. 5-3
5.6 Ambient Air Quality Impacts ................................ ................................ ..................... 5-3
5.7 Toxic Air Contaminant (TAC) Impacts ................................ ................................ ....... 5-4
5.7.1 Air Dispersion Modeling (AERMOD) ........................................................................... 5-4
5.7.2 HARP2 ................................................................................................................... 5-6
5.7.3 Health Risk Results .................................................................................................. 5-7
5.8 Greenhouse Gas Emissions ................................ ................................ ........................ 5-8
5.9 Cumulative Impacts ................................ ................................ ................................ .. 5-9
6. CONCLUSIONS 6-1
7. REFERENCES 7-1
APPENDIX A. CALEEMOD EMISSIONS ESTIMATES OUTPUT A-1
APPENDIX B. HEALTH RISK ASSESSMENT MODELING FILES B-1
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants ii
LIST OF FIGURES
Figure 2-1. Project Location 2-1
Figure 2-2. Proposed Site Plan 2-2
Figure 5-1. Receptors Analyzed for Health Risk 5-6
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants iii
LIST OF TABLES
Table 3-1. Small Project Analysis Level in Units for Residential 3-1 Table 4-1. SJVAPCD Air Quality Thresholds of Significance - Criteria Pollutants 4-1 Table 4-2. Measures of Significance - Toxic Air Contaminants 4-2 Table 5-1. Project Construction Emissions 5-1
Table 5-2. Total Project Operational Emissions 5-2
Table 5-3. Sensitive Receptors Located < 2 Miles from Project 5-2 Table 5-4. Average Daily Emissions 5-4
Table 5-5. Potential Maximum Health Risk Impacts 5-7
Table 5-6. Estimated Annual Greenhouse Gas Emissions (MT/Year) 5-9
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 1-1
1. EXECUTIVE SUMMARY
1.1 Executive Summary
Trinity Consultants has completed a limited air quality assessment for 191-unit multi -family residential community near the intersection of Camino Media and Old River Road in Bakersfield, California.
This limited air quality assessment uses the San Joaquin Valley Air Pollution Control District’s (SJVAPCD) screening tool, Small Project Analysis Level (SPAL) (SJVAPCD 20 20). This SPAL assessment was prepared pursuant to the City of Bakersfield’s Technical Study Guidelines (Bakersfield 2015), SJVAPCD’s Guidance for Assessing and Mitigating Air Quality Impacts (GAMAQI) (SJVAPCD 2015), the California Environmental Quality Act (CEQA) (Public Resources Code 21000 to 21189) Guidelines (California Code of Regulations Title 14, Division 6, Chapter 3, Sections 15000 – 15387).
1.2 Statement of Finding
Based on the SPAL established by the SJVAPCD’s GAMAQI, the emissions estimates prepared pursuant to this SPAL assessment do not exceed the SJVAPCD’s established emissions thresholds and significance thresholds for all CEQA air quality determinations; this Project would therefore not pose a significant impact to the San Joaquin Valley Air Basin and would have a less than significant air quality impact.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 2-1
2. PROJECT INFORMATION
2.1 Introduction
The Project site is located in the City of Bakersfield east of the intersection of Camino Media and Old River Road on APNs 390 -300-29 and 390 -300-30. The Project includes the construction of 191 multi -family residential units. The Project was assessed as if it would be developed in one phase. This assessment examines the projected gross impacts to air quality posed by this Project to the San Joaquin Valley Air Basin to determine whether or not the Project remains below established air quality thresholds of significance.
2.2 Project Location
The Project is located in the City of Bakersfield east of the intersection of Camino Media and Old River Road.
Figure 2-1 depicts the Project location within the City of Bakersfield and Figure 2-2 depicts the proposed site plan.
Figure 2-1. Project Location
Project
Location
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 2-2
Figure 2-2. Proposed Site Plan
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 3-1
3. SMALL PROJECT ANALYSIS LEVEL QUALIFICATION
This assessment was prepared pursuant to the SJVAPCD’s GAMAQI (SJVAPCD 2015), the CEQA (Public Resources Code 21000 to 21189) and CEQA Guidelines (California Code of Regulations Title 14, Division 6, Chapter 3, Sections 15000 – 15387). The SJVAPCD created the SPAL screening tool to streamline air quality assessments of commonly encountered projects. According to GAMAQI, the SJVAPCD “pre -calculated the emissions on a large number and types of projects to identify the level at which they have no possibility o f exceeding the emissions thresholds”1.
The SJVAPCD SPAL process established review parameters to determine whether a project qualifies as a “small project.” A project that is found to be “less than” the established parameters has “no possibility of exceeding criteria pollutant emissions thresholds.” Table 3-1 presents the SPAL size parameters for residential projects.
Table 3-1. Small Project Analysis Level in Units for Residential Land Use Category – Residential Project Size (dwelling unit)* Single Family 155
Apartment, Low Rise 224
Apartment, Mid Rise 225
Apartment, High Rise 340
Condominiums/Townhouse 256
Condominiums, High Rise 352
Mobile Home Park 292
Retirement Community 580
Congregate Care Assisted Living 536
Proposed Project – Apartment, Low Rise 191
SPAL Exceeded? No
*Project size based on SPAL Table 1, as posted on SJVAPCD webpage:
http://www.valleyair.org/transportation/CEQA Rules/GAMAQI-SPAL.pdf
As shown in Table 3-1, the proposed Project would not exceed the established SPAL limits for an “Apartment, Low Rise” residential project. The Project would construct 191 units compared to the allowable project size for a low rise apartment project which is 224 units. Based on the above information, this Project qualifies for a limited air quality analysis applying the SPAL guidance to determine air quality impacts.
1 SJVAPCD GAMAQI, Section 8.3.4, Page 85.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 4-1
4. AIR QUALITY IMPACTS THRESHOLDS AND EVALUATION
METHODOLOGY
Significance thresholds are based on the CEQA Appendix G Environmental Checklist Form (not included herein) and SJVAPCD air quality thresholds (SJVAPCD 2015). A potentially significant impact to air quality, as defined by the CEQA Checklist, would occur if the project caused one or more of the following to occur:
► Conflict with or obstruct implementation of the applicable air quality plan; ► Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard; ► Expose sensitive receptors to substantial pollutant concentrations; and/or ► Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.
The SJVAPCD has identified quantitative emission thresholds to determine whether the potential air quality impacts of a project require analysis in the form of an Environmental Impact Report. The SJVAPCD air quality thresholds from the GAMAQI are presented in Table 4-1 (SJVAPCD 2015). The SJVAPCD separates construction emissions from operational emissions, and further separates permitted operational emissions from non-permitted operational emissions, for determining significance thresholds for air pollutant emissions.
Table 4-1. SJVAPCD Air Quality Thresholds of Significance - Criteria Pollutants Pollutant/
Precursor
Construction
Emissions
Operational Emissions
Permitted Equipment
and Activities
Non-Permitted
Equipment and Activities
Emissions (tpy) Emissions (tpy) Emissions (tpy)
CO 100 100 100
NOx 10 10 10
ROG 10 10 10
SOx 27 27 27
PM10 15 15 15
PM2.5 15 15 15
Source: SJVAPCD 2015
Criteria pollutant emissions were estimated using the California Emissions Estimator Model (CalEEMod) version 2022.1 (California Air Pollution Control Officers Association (CAPCOA) 2022 ). This project would generate short-term construction emissions and long-term operational emissions.
An air quality evaluation also considers: 1) exposure of sensitive receptors to substantial pollutant concentrations; and 2) the creation of other emissions (such as those leading to odors) adversely affecting a substantial number of people. The criteria for this evaluation are based on the Lead Agency’s determination of the proximity of the proposed Project to sensitive receptors. A sensitive receptor is a location where human populations, especially children, senior citizens and sick persons, are present, and where there is a reasonable expectation of continuous human exposure to pollutants, according to the averaging period for ambient air quality standards, i.e. the 24 -hour, 8-hour or 1-hour standards. Commercial and industrial sources are not considered sensitive receptors.
Regarding toxic air contaminants, t he SJVAPCD’s GAMAQI states, “From a health risk perspective there are basically two types of land use projects that have the potential to cause long-term public health risk impacts:
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 4-2
► Type A Projects: Land use projects that will place new toxic sources in the vicinity of existing receptors, and
► Type B Projects: Land use projects that will place new receptors in the vicinity of existing toxics sources” (SJVAPCD 2015).
Table 4-2 presents the thresholds of significance used with toxic air contaminants when evaluating toxic air contaminants (TACs).
Table 4-2. Measures of Significance - Toxic Air Contaminants Agency Level Description
Significance Thresholds Adopted for the Evaluation of Impacts Under CEQA
SJVAPCD
Carcinogens Maximally Exposed Individual risk equals or exceeds 20 in one million.
Non-
Carcinogens
Acute: Hazard Index equals or exceeds 1 for the
Maximally Exposed Individual.
Chronic: Hazard Index equals or exceeds 1 for the
Maximally Exposed Individual.
Source: SJVAPCD 2015
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 5-1
5. PROJECT-RELATED EMISSIONS
This document was prepared pursuant to the SJVAPCD’s GAMAQI and SPAL guidelines and provides a cursory review of the Project emissions to demonstrate that it would not exceed established air quality emissions thresholds.
5.1 Short-Term Emissions
Table 5-1 shows the construction emission levels for the construction of a 191 unit low rise apartment project (see Appendix A). The construction emissions were based on the default CalEEMod equipment list for the proposed Project’s land use type and development intensity and applying model defaults as well as a conservative analysis approach. Construction emissions were estimated u nder the assumption that the residential development would begin construction in May 2025. The dates entered into the CalEEMod program represent the earliest construction timeline, which would estimate the worst -case emissions as construction equipment technology and emissions improve over time; therefore, all estimated emission totals ar e conservative and reflect a reasonable and legally sufficient estimate of potential impacts. All construction equipment activity levels assumed were based on the CalEEMod default values for type and number of equipment and hours per day.
Construction emission estimates also included the following SJVAPCD’s required measures for all projects:
► Water exposed area 3 times per day; and
► Reduce vehicle speed to less than 15 miles per hour.
Based on these anticipated activity levels, the Project construction activities would not exceed construction thresholds, as shown in Table 5-1. Therefore, construction emissions were found to be less than significant, and no further evaluation is required.
Table 5-1. Project Construction Emissions
Emissions
Source
Pollutant
ROG NOx CO SOx PM10 PM2.5
(tons/year)
2025 Construction Emissions 0.23 1.87 2.52 0.00 0.32 0.15 2026 Construction Emissions 0.26 1.76 3.21 0.00 0.36 0.13 2027 Construction Emissions 0.71 0.39 0.70 0.00 0.07 0.03 Maximum Annual Emissions 0.71 1.87 3.21 0.00 0.36 0.15
SJVAPCD Construction Emissions Thresholds 10 10 100 27 15 15 Is Threshold Exceeded? No No No No No No
Source: Trinity Consultants 2025
Note: 0.00 could represent < 0.00; SOx is assumed to be equivalent to SO2.
As calculated with CalEEMod, the estimated short-term construction-related emissions would not exceed SJVAPCD significance threshold levels during any given year and would therefore be less than significant.
5.2 Long-Term Emissions
Table 5-2 presents the Project’s long-term operations emissions generated from mobile, energy, and area sources as well as from water use and waste generation emissions. Most of these emissions impacts are from
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 5-2
mobile sources traveling to and from the Project area. The following changes to default values were incorporated during the CalEEMod analysis:
► Daily trip rate was updated to 1,403 trips per day according to the Traffic Study (Ruettgers & Schuler 2021)
Table 5-2. Total Project Operational Emissions
Emissions
Source
Pollutant
ROG NOx CO SOx PM10 PM2.5
(tons/year)
Operational Emissions
Mobile 0.71 0.75 6.67 0.02 1.69 0.44
Area 0.97 0.01 1.00 0.00 0.00 0.00
Energy 0.01 0.26 0.11 0.00 0.02 0.02
Water - - - - - -
Waste - - - - - -
Refrigerants - - - - - -
Total Emissions 1.70 1.02 7.78 0.02 1.71 0.46
SJVAPCD Operational Emissions Thresholds 10 10 100 27 15 15 Is Threshold Exceeded Before Mitigation? No No No No No No Source: Trinity Consultants 2025
Note: 0.00 could represent < 0.00; SOx is assumed to be equivalent to SO2.
As calculated (see Appendix A), the long-term operational emissions associated with the proposed Project would be less than SJVAPCD significance threshold levels and would, therefore, not pose a significant impact to criteria air pollutants. This finding is consistent with the SPAL screening thresholds.
5.3 Potential Impact on Sensitive Receptors
The proposed Project is located east of the intersection between Camino Media and Old River Road. Sensitive receptors are defined as areas where young children, chronically ill individuals, the elderly, or people who are more sensitive than the general population reside. Schools, hospitals, nursing homes and daycare centers are locations where sensitive receptors would likely reside. There are currently sensitive receptors at the existing Rosewood senior living and health center located on the proposed Project site.
Table 5-3 below shows the non-residential sensitive receptors within 2 miles of the Project site.
Table 5-3. Sensitive Receptors Located < 2 Miles from Project Receptor Type of Facility Distance from
Project in Miles
Direction from
Project
Childtime of Bakersfield Daycare 0.03 S
CSUB Children’s Center Daycare 0.23 N
Mercy Hospital Hospital 0.34 N
Ronald Regan Elementary School Elementary School 0.58 W Leo B Hart Elementary School Elementary School 0.89 S
Christa McAuliffe Elementary School Elementary School 0.92 SE Brookdale Riverwalk Senior Living 1.0 N
Brookside Senior Apartments Senior Living 1.0 SW
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 5-3
Receptor Type of Facility Distance from
Project in Miles
Direction from
Project
Stockdale Elementary School Elementary 1.13 E
Solstice Senior Living Senior Living 1.14 SE
Stockdale High School High School 1.19 SW
Magnolia Place Senior Living 1.2 SE
Columbia Elementary School Elementary School 1.28 N
La Petite Academy Daycare 1.32 SE
American Elementary School Elementary School 1.32 N
Tevis Junior High School Middle School 1.49 SE
Liberty High School High School 1.54 NW
Quailwood Elementary School Elementary School 1.67 NE
Oaks Children Center Daycare 1.69 S
Bakersfield Christian High School High School 1.69 W
Old River Elementary School Elementary School 1.74 S
Sing Lum Elementary School Elementary School 2.0 S
The closest school is Ronald Reagan Elementary School at 0.58 miles to the west. The closest hospital is Mercy Hospital Southwest at 0.34 miles north, and the closest daycare facility is Childtime of Bakersfield at 0.03 miles to the south of the Project.
Based on the predicted operational emissions and activity types, the proposed Project is not expected to affect any on-site or off-site sensitive receptors and is not expected to have any adverse impacts on any known sensitive receptor.
5.4 Potential Impacts to Visibility to Nearby Class 1 Areas It should be noted that visibility impact analyses are not usually conducted for area sources. The recommended analysis methodology was initially intended for stationary sources of emissions which were subject to the Prevention of Significant Deterioration (PSD) requirements in 40 CFR Part 60. Since the Project’s emissions are predicted to be significantly less than the PSD threshold levels, an impact at either the Dome Land Wilderness or the Sequoia National Park Areas (the two nearest Class 1 areas to the Project) is extremely unlikely. Therefore, based on the Project’s predicted emissions, the Project is not expected to have any adverse impact to visibility at any Class 1 Area.
5.5 Potential Odor Impacts
The proposed Project is a residential community located near other residential neighborhoods. Expected uses are not known to be a source of nuisance odors and are not listed in Table 6 of the SJVAPCD’s GAMAQI. The Project is therefore not anticipated to have substantial odor impacts. The Project is therefore anticipated t o have a less than significant odor impact.
5.6 Ambient Air Quality Impacts
As stated in the of GAMAQI (2015, p 96-97), SJVAPCD has developed screening levels for requiring an Ambient Air Quality Analysis (AAQA). The SJVAPCD recommends that an AAQA be performed for all criteria pollutants when emissions of any criteria pollutant resulting from project construction or operational activities exceed the 100 pounds per day screening level, after compliance with Rule 9510 requirements and implementation of all enforceable mitigation measures.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 5-4
As shown above in Table 5-4 below, average daily emissions for construction and operational activities associated with this Project would not exceed 100 pounds per day. Therefore, an AAQA is not required for this Project.
Table 5-4. Average Daily Emissions
Emission Source Pollutant (Pounds/Day)
ROG NOx CO SO2 PM10 PM2.5
Construction Emissions
Average Daily (Max) Emissions 5.50 14.37 24.66 0.03 2.74 1.14 AAQA Threshold 100 100 100 100 100 100
Is Threshold Exceeded? No No No No No No
Operational Emissions
Average Daily (Max) Emissions 9.31 5.59 42.64 0.10 9.38 2.50 AAQA Threshold 100 100 100 100 100 100
Is Threshold Exceeded? No No No No No No
5.7 Toxic Air Contaminant (TAC) Impacts
TACs, as defined by the California Health & Safety Code (CH&SC) §44321, are listed in Appendices AI and AII in AB 2588 Air Toxic “Hot Spots” and Assessment Act’s Emissions Inventory Criteria and Guideline Regulation document. SJVAPCD’s risk management objectives for permitting and CEQA are as follows:
► Minimize health risks from new and modified sources of air pollution. ► Health risks from new and modified sources shall not be significant relative to the background risk levels and other risk levels that are typically accepted throughout the community. ► Avoid unreasonable restrictions on permitting.
The proposed Project would result in emissions of Toxic Air Contaminants (TACs) during construction and would be located near existing residents; therefore, an assessment of the potential risk to the population attributable to emissions of hazardous air pollutants from the proposed Project is required. To predict the potential health risk to the population attributable to emissions of TACs from the proposed Project, ambient air concentrations were predicted with dispersion modeling to arrive at a conservative estimate of increased individual carcinogenic risk that might occur as a result of continuous exposure over the construction period for construction emissions. Similarly, predicted concentrations were used to calculate non-cancer chronic and acute hazard indices (HIs), which are the ratio of expected exposure to acceptable exposure. The basis for evaluating potential health risk is the identification of sources with increased TACs . TAC emissions from anticipated on-site construction activities were evaluated.
5.7.1 Air Dispersion Modeling (AERMOD)
Air dispersion modeling is used to estimate off -site air concentrations of chemicals associated with facility emissions. Developed to replace the Industrial Source Complex Short -Term Version 3 (ISCST3) model, AERMOD is a steady -state Gaussian plume model that can be used to assess ground level pollutant concentrations from a wide variety of sources (point, line, area, or volume) for distances up to approximately 50 km, including urban and rural terrains. AERMOD can calculate ground level concentrations for various averaging periods, such as acute short -term exposures (1 -hour averaging), chronic long term exposures (annual averages), or other required meteorological data periods (i.e., 3 -hour, 8 -hour, 24 -hour). The assumptions used for this model are listed below.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 5-5
► AERMOD Version 24142
► Projection Universal Transverse Mercator (UTM)
► Datum World Geodetic System (WGS84)
► UTM Zone 11
► Hemisphere Northern
► Selection Hourly and Period
► AERMOD File .AMI and .AMZ
► AERMOD Output File Plot File by Source
► Use Regulatory Default? Yes
► Urban or Rural? Urban
► Building Downwash? Yes
Health risk is determined using the Hotspots Analysis and Reporting Program (HARP2) software distributed by the CARB; HARP2 requires peak 1-hour emission rates and annual-averaged emission rates for all pollutants for each modeling source (CARB 2015). Assumptions used to calculate the emission rates for the proposed Project are outlined below.
5.7.1.1 Sources
To assess health risk impacts associated with Project construction emissions, combustion emissions from diesel on-site construction equipment and heavy heavy duty (HHD) trucks from hauling and vendor trips were modeled as an area source for on -site constru ction activity on the property. A unit emission rate of 1 grams/second (g/sec) was input to AERMOD as a normalized emission rate. This normalized emission rate generates a file that contains the partial contribution of each source to the total air concentration in units of micrograms per cubic meter (g/m
3) at each receptor. This AERMOD output file is then used as an input file into HARP2, which is discussed in Section 5.7.2.
5.7.1.2 Receptors
Discrete receptors were placed on residences , businesses, and sensitive receptors within close proximity of the Project site. A total of 2,684 discrete off-site receptors analyzed. The receptors are shown below in Figure 5-1. Elevated terrain options were employed even though there is not complex terrain in the Project area.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 5-6
Figure 5-1. Receptors Analyzed for Health Risk
5.7.1.3 Meteorological Data
SJVAPCD-provided, AERMET UStar processed meteorological datasets for the Bakersfield monitoring station, calendar years 2018 through 2022 was input to AERMOD (SJVAPCD 2023). This was the most recent available dataset available at the time the modeling was conducted. Urban dispersion parameters were used because the operation and the majority of the land surrounding the facility is considered "urban" under the Auer land use classification method (Auer 1978).
5.7.2 HARP2
Plot files generated by AERMOD were uploaded to the Air Dispersion Modeling and Risk Assessment Tool (ADMRT) program in the Hotspots Analysis and Reporting Program Version 2 (HARP2) (CARB 2015). ADMRT post-processing was used to assess the potential for excess cancer risk and chronic non-cancer effects using the most recent health effects data from the California EPA Office of Environmental Health Hazard Assessment (OEHHA).
5.7.2.1 Toxic Emissions Quantification
Diesel particulate matter was calculated based on the CalEEMod output of PM 10 for on -site construction equipment. It is conservatively assumed that all PM10 exhaust from CalEEMod is diesel particulate matter.
While each year of construction has different emissions, the HARP2 analysis was conducted based on the maximum annual emissions of PM10 from construction, which is a conservative estimate.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 5-7
5.7.2.1.1 Health Impacts of Diesel Particulate Matter (DPM) Short term exposure to high concentrations to DPM can cause headache, dizziness, and irritation of the eye, nose, and throat. Long term exposure can increase the risk of cardiovascular, cardiopulmonary and respiratory disease, and lung cancer.
5.7.2.2 Exposure
HARP2 site parameters were set for the mandatory minimum pathways (inhalation, soil ingestion, dermal, and mother’s milk, and homegrown produce for residential and sensitive receptors; inhalation, soil ingestion, and dermal for worker receptors). As required by SJVAPCD, time away from home adjustments were not applied in HARP2. Risk reports were generated using the derived OEHHA analysis method for carcinogenic risk and non-carcinogenic chronic risk. Site parameters are included in the HARP2 output files. Total cancer risk was predicted for each receptor. A hazard index was computed for chronic non -cancer health effects for each applicable endpoint and each receptor. A hazard index for acute non-cancer health effects was not computed since DPM does not have a risk exposure level for acute risk.
5.7.3 Health Risk Results
SJVAPCD has set the level of significance for carcinogenic risk at twenty in one million, which is understood as the possibility of causing twenty additional cancer cases in a population of one million people. The level of significance for chronic non- cancer risk is a hazard index of 1.0. All receptors were modeled with a 2-year exposure duration for the construction activities.
The carcinogenic risk and the health hazard index (HI) for chronic non-cancer risk at the maximum exposed individual resident, worker, and sensitive receptor (MEIR, MEIW, and MEISR, respectively) do not exceed the significance levels of twenty in one million (20E-06) and 1.0, respectively for the proposed Project. The MEIR, MEIW, and MEISR are identified by receptor location and risk and are provided in Table 5-5. The electronic AERMOD and HARP2 output files are provided in Appendix B.
Table 5-5. Potential Maximum Health Risk Impacts
Receptor Type Category Value UTM East UTM North
MEIR Excess Cancer Risk 1.33 in a million 307794.2 3913489.2 Chronic Hazard Index 0.0008 307794.2 3913489.2
MEIW Excess Cancer Risk 0.43 in a million 308091.7 3913323.5 Chronic Hazard Index 0.0119 308091.7 3913323.5
MEISR Excess Cancer Risk 1.60 in a million 308009.2 3913177.6 Chronic Hazard Index 0.0009 308009.2 3913177.6
As shown above in Table 5-5, the maximum predicted cancer risk for the proposed Project is 1.60 in a million.
The maximum chronic non-cancer hazard index for the proposed Project is 0.0119.
The potential health risk attributable to the proposed Project is determined to be less than significant based on the following conclusions:
1. Potential carcinogenic risk from the proposed Project is below the significance level of twenty in a million at each of the modeled receptors; and
2. The hazard index for the potential chronic non- cancer risk from the proposed Project is below the significance level of 1.0 at each of the modeled receptors.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 5-8
3. The hazard index for the potential acute non- cancer risk was not calculated since there is no acute risk associated with DPM emission; therefore, the proposed Project is considered below the significance level.
Therefore, potential risk to the population attributable to emissions of TACs from the proposed Project would be less than significant.
5.8 Greenhouse Gas Emissions
Since SJVAPCD published the GAMAQI, several new laws and executive orders were adopted that require additional reductions in years after 2020. For instance, Senate Bill 32 (Lara, 2016) requires that GHG emissions be 40% less than 1990 levels by 2030. Furthermore, Senate Bill 100 (de Leon, 2018) requires 100% zero - carbon electricity by 2045. On the day SB 100 was signed into law, the Governor also signed Executive Order B-55-18 which commits California to total, economy -wide carbon neutrality by 2045. While GHG emissions from an individual project may not have a detectable impact on global climate change, it may contribute to a significant cumulative problem (BAAQMD 2022). Therefore, as climate change is a global issue, it no longer makes sense to evaluate GHG emissions on a project-level.
For these reasons, Project GHG emissions levels presented in Table 5-6 are primarily for disclosure purposes because impact analysis for the Project follows the approach certified by South Coast AQMD in the Final Negative Declaration for the Phillips 66 Los Angeles Refinery Carson Plant – Crude Oil Storage Capacity Project on December 12, 2014 (South Coast AQMD, 2014). The approach used by South Coast AQMD to assess GHG impacts from that project recognizes that consumers of electricity and transportation fuels are, in effect, regulated by requiring providers and importers of electricity and fuel to participate in the GHG Cap-and-Trade Program and other Programs (e.g., low carbon fuel standard, renewable portfolio standard, etc.). Each such sector-wide program exists within the framework of AB 32 and its descendant laws the purpose of which is to achieve GHG emissions reductions consistent with the AB 32 Scoping Plan.
In summary, the Project would generate GHGs from electricity use and combustion of gasoline/diesel fuels, each of which is regulated near the top of the supply-chain. As such, each citizen of California (including the operator of the Project) will have no choice but to purchase electricity and fuels produced in a way that is acceptable to the California market. Thus, Project GHG emissions will be consistent with the relevant plan (i.e., AB 32 Scoping Plan). The Project would meet its fair share of the cost to mitigate the cumulative impact of global climate change because the Project would be purchasing energy from the California market. Thus, the Project would have a less than significant impact on applicable GHG reduction plans.
Nonetheless, GHG emissions impacts from implementing the Project were calculated at the Project -specific level for construction and operations as explained in the previous paragraphs. Impact analysis for the Project follows the approach certified by South Coast AQMD in the Final Negative Declaration for the Phillips 66 Los Angeles Refinery Carson Plant – Crude Oil Storage Capacity Project on December 12, 2014 (South Coast AQMD, 2014). In summary, this approach takes into account the cumulative nature of the energy industry and recognizes that consumers of electricity and diesel fuel are in effect regulated by higher level emissions restrictions on the producers of these energy sources. Therefore, the Project’s contribution to cumulative global climate change impacts would not be cumulatively considerable.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 5-9
Table 5-6. Estimated Annual Greenhouse Gas Emissions (MT/Year) Source CO2 CH4 N2O Refrigerant CO2e
Mitigated Construction Emissions
Total 679 0.02 0.03 0.49 688
Mitigated Operational Emissions
Mobile Emissions 1,619 0.09 0.08 2.18 1,646
Area Emissions 2.45 0.00 0.00 - 2.46
Energy Emissions 317 0.03 0.00 - 318
Water Emissions 6.25 0.27 0.01 - 15.03
Waste Emissions 15.88 1.59 - - 55.56
Refrigerant Emissions - - - 0.25 0.25
Total Project Operational Emissions 1,960 1.98 0.08 2.43 2,037 Annualized Construction Emissions1 22.64 0.00 0.00 0.02 22.93 Project Emissions 1,983 1.98 0.08 2.44 2,060
*Note: 0.000 could represent <0.000
Per South Coast AQMD’s Methodology
The Project will not result in the emissions of hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), or sulfur hexafluoride (SF6), the other gases identified as GHG in AB32. The proposed Project will be subject to any regulations developed under AB32 as determined by CARB.
5.9 Cumulative Impacts
CEQA Guidelines Section 15150 permits the incorporation by reference of portions or all of other documents that provide information relevant to the Proposed Project and the environmental analysis. Documents incorporated by reference must be available for public review at an office of the Lead Agency or other public building. The documents identified below are incorporated by reference, and where relevant, the information therein has been summarized in this report.
The Metropolitan Bakersfield General Plan Update Program Environmental Impact Report (Bakersfield 2002), provides relevant cumulative analysis in the proposed Project area, is a comprehensive document, and are hereby incorporated by references pursuant to CEQA Guidelines Section 15150. The Metropolitan Bakersfield General Plan Update Program Environmental Impact Report can be reviewed at the City of Bakersfield’s Planning Division office:
1715 Chester Avenue
Bakersfield, CA 93301-5210
Monday through Friday
8 a.m. to 5 p.m.
The Proposed Project area is designated as an extreme nonattainment area for ozone and a nonattainment area for PM
10 and PM2.5.
To evaluate cumulative impacts, a list approach is used, in accordance with Section 15130(b) of the CEQA Guidelines. The list approach may utilize either (1) a list of past, present, and probable future projects producing related or cumulative impacts, including, if necessary, those projects outside the control of the agency; or (2) a summary of projections contained in an adopted general plan or related planning document, or in a prior environmental document that has been adopted or certified, which described or evaluated regional or area-wide conditions contributing to the cumulative impact.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 5-10
The potential cumulative impacts from the Proposed Project and other projects are discussed below. A cumulative project list was incorporated by reference above from the Metropolitan Bakersfield General Plan Update Program Environmental Impact Report (City of Bakersfield, 2002). Because the Basin is currently designated as “nonattainment” for ozone, PM10, and PM2.5, these projects could contribute to an existing or projected air quality exceedance, which would be a cumulative impact.
With regard to determining the significance of the contribution from the Proposed Project, the City of Bakersfield recommends that any given project’s potential contribution to cumulative impacts be assessed using the same significance criteria as for project-specific impacts. Therefore, individual projects that do not generate operational or construction emissions that exceed the SJVAPCD’s recommended daily or annual thresholds for project-specific impacts would also not cause a cumulatively considerable increase in emissions for those pollutants and, therefore, would not be considered to have a significant adverse air quality impact.
Therefore, the Proposed Project’s cumulative contribution is considered less than significant.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 6-1
6. CONCLUSIONS
Based on the criteria established by the City of Bakersfield’s Technical Studies Guidelines, SJVAPCD’s GAMAQI, and SJVAPCD’s SPAL guidelines, the proposed Project does not meet the minimum standards to require a full Air Quality Impact Analysis. Furthermore, the Project as proposed would not exceed the SJVAPCD’s criteria air pollutant emission levels and would generate less than significant air quality impacts.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants 7-1
7. REFERENCES
Bakersfield, City of. 2015. Technical Studies Guidelines, released October 27, 2015. https://content.civicplus.com/api/assets/265f75f5-bae8-40f9-8e34-7b01f8fc9d17 --------. 2002. Metropolitan Bakersfield General Plan, December 2002. https://content.civicplus.com/api/assets/6c7a0380-7841-40d6-b3ef-23ceb4fa0fd7 California Air Pollution Control Officers Association (CAPCOA). 2022a. California Emissions Estimator Model™ (CalEEMod), version 2022.1, released April 2022.
--------. 2022b. User Guide for CalEEMod Version 2022.1. https://www.caleemod.com/user-guide California Environmental Quality Act (CEQA) Statute and Guidelines. 2025. (Public Resources Code 21000 to 21177) and CEQA Guidelines (California Code of Regulations Title 14, Division 6, Chapter 3, Sections 15000 – 15387).
--------. 2018. Appendix G – Environmental Checklist Form, Final Text. December 28, 2018.
Ruettgers & Schuler. 2021. Camino Media – Single Family Residential.
San Joaquin Valley Air Pollution Control District (SJVAPCD). 2023. UStar Meteorological Datasets for Bakersfield 2018-2022. https://www.valleyair.org/permitting/air-dispersion-modeling/meteorological- data/
----------. 2020. Small Project Analysis Level (SPAL) Memorandum. November 13, 2020. http://www.valleyair.org/transportation/CEQA%20Rules/GAMAQI-SPAL.PDF -----------. 2015. Guidance for Assessing and Mitigating Air Quality Impacts (GAMAQI). March 19, 2015. http://www.valleyair.org/transportation/GAMAQI_3-19-15.pdf -----------. 2009. Guidance for Valley Land-use Agencies in Addressing GHG Emission Impacts for New Projects under CEQA. December 17, 2009.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants A-1
APPENDIX A. CALEEMOD EMISSIONS ESTIMATES OUTPUT
Camino Media - University Square Custom Report, 5/27/2025 1 / 85
Camino Media - University Square Custom Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Y ear, Unmitigated
2.3. Construction Emissions by Y ear, Mitigated
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
2.6. Operations Emissions by Sector, Mitigated
3. Construction Emissions Details
3.1. Site Preparation (2025) - Unmitigated
3.2. Site Preparation (2025) - Mitigated
3.3. Grading (2025) - Unmitigated
Camino Media - University Square Custom Report, 5/27/2025 2 / 85
3.4. Grading (2025) - Mitigated
3.5. Building Construction (2025) - Unmitigated
3.6. Building Construction (2025) - Mitigated
3.7. Building Construction (2026) - Unmitigated
3.8. Building Construction (2026) - Mitigated
3.9. Building Construction (2027) - Unmitigated
3.10. Building Construction (2027) - Mitigated
3.11. Paving (2027) - Unmitigated
3.12. Paving (2027) - Mitigated
3.13. Architectural Coating (2027) - Unmitigated
3.14. Architectural Coating (2027) - Mitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.1.2. Mitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.2. Electricity Emissions By Land Use - Mitigated
Camino Media - University Square Custom Report, 5/27/2025 3 / 85
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.2.4. Natural Gas Emissions By Land Use - Mitigated
4.3. Area Emissions by Source
4.3.1. Unmitigated
4.3.2. Mitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
4.4.2. Mitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
4.5.2. Mitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.6.2. Mitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
4.7.2. Mitigated
4.8. Stationary Emissions By Equipment Type
Camino Media - University Square Custom Report, 5/27/2025 4 / 85
4.8.1. Unmitigated
4.8.2. Mitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.9.2. Mitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.2.2. Mitigated
5.3. Construction Vehicles
Camino Media - University Square Custom Report, 5/27/2025 5 / 85
5.3.1. Unmitigated
5.3.2. Mitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.9. Operational Mobile Sources
5.9.1. Unmitigated
5.9.2. Mitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.1.2. Mitigated
5.10.2. Architectural Coatings
Camino Media - University Square Custom Report, 5/27/2025 6 / 85
5.10.3. Landscape Equipment
5.10.4. Landscape Equipment - Mitigated
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.11.2. Mitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.12.2. Mitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.13.2. Mitigated
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.14.2. Mitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.15.2. Mitigated
5.16. Stationary Sources
Camino Media - University Square Custom Report, 5/27/2025 7 / 85
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
5.18.2.2. Mitigated
8. User Changes to Default Data
Camino Media - University Square Custom Report, 5/27/2025 8 / 85
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Camino Media - University Square
Construction Start Date 5/1/2025
Operational Y ear 2027
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70
Precipitation (days) 18.0
Location 35.34461151822452, -119.11083654604438
County Kern-San Joaquin
City Bakersfield
Air District San Joaquin Valley APCD
Air Basin San Joaquin Valley
TAZ 2809
EDFZ 5
Electric Utility Pacific Gas & Electric Company
Gas Utility Southern California Gas
App Version 2022.1.1.29
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Apartments Low
Rise
191 Dwelling Unit 9.40 202,460 121,093 — 615 —
Camino Media - University Square Custom Report, 5/27/2025 9 / 85
Parking Lot 185 Space 1.66 0.00 0.00 — — —
Recreational
Swimming Pool
1.70 1000sqft 0.04 1,700 0.00 — — —
Health Club 4.50 1000sqft 0.10 4,500 0.00 — — —
General Office
Building
1.50 1000sqft 0.03 1,500 0.00 — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector # Measure Title
Construction C-10-A Water Exposed Surfaces
Construction C-10-C Water Unpaved Construction Roads
Construction C-11 Limit Vehicle Speeds on Unpaved Roads Energy E-10-B Establish Onsite Renewable Energy Systems: Solar Power
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 38.9 38.9 31.7 31.5 0.06 1.37 19.9 21.2 1.26 10.2 11.4 — 6,869 6,869 0.28 0.19 8.76 6,895 Mit. 38.9 38.9 31.7 31.5 0.06 1.37 5.32 6.69 1.26 2.68 3.93 — 6,869 6,869 0.28 0.19 8.76 6,895 %
Reduced
— — — — — — 73% 68% — 74% 66% — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.02 1.72 12.0 20.6 0.03 0.44 1.91 2.35 0.41 0.46 0.86 — 4,773 4,773 0.14 0.19 0.23 4,833 Camino Media - University Square Custom Report, 5/27/2025 10 / 85
Mit. 2.02 1.72 12.0 20.6 0.03 0.44 1.91 2.35 0.41 0.46 0.86 — 4,773 4,773 0.14 0.19 0.23 4,833 %
Reduced
— — — — — — — — — — — — — — — — — —
Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 3.96 3.92 10.2 17.6 0.02 0.41 2.96 3.37 0.37 1.16 1.53 — 4,102 4,102 0.11 0.16 2.94 4,156 Mit. 3.96 3.92 10.2 17.6 0.02 0.41 1.62 1.95 0.37 0.44 0.81 — 4,102 4,102 0.11 0.16 2.94 4,156 %
Reduced
— — — — — — 45% 42% — 62% 47% — — — — — — —
Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.72 0.71 1.87 3.21 < 0.005 0.07 0.54 0.61 0.07 0.21 0.28 — 679 679 0.02 0.03 0.49 688 Mit. 0.72 0.71 1.87 3.21 < 0.005 0.07 0.30 0.36 0.07 0.08 0.15 — 679 679 0.02 0.03 0.49 688 %
Reduced
— — — — — — 45% 42% — 62% 47% — — — — — — —
Exceeds
(Annual)
— — — — — — — — — — — — — — — — — —
Threshol
d
— 10.0 10.0 100 27.0 — — 15.0 — — 15.0 — — — — — — —
Unmit. — No No No No Y es — No Y es — No — — — — — — —
Mit. — No No No No Y es — No Y es — No — — — — — — —
2.2. Construction Emissions by Y ear, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Y ear TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2025 4.03 3.39 31.7 31.5 0.06 1.37 19.9 21.2 1.26 10.2 11.4 — 6,869 6,869 0.28 0.19 8.76 6,895 2026 1.98 1.70 11.2 23.0 0.03 0.39 1.91 2.30 0.36 0.46 0.81 — 4,950 4,950 0.13 0.18 7.93 5,016 2027 38.9 38.9 6.99 10.9 0.01 0.30 0.34 0.48 0.27 0.08 0.32 — 1,705 1,705 0.06 0.02 1.10 1,713 Camino Media - University Square Custom Report, 5/27/2025 11 / 85
Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2025 2.02 1.72 12.0 20.6 0.03 0.44 1.91 2.35 0.41 0.46 0.86 — 4,773 4,773 0.14 0.19 0.23 4,833 2026 1.92 1.63 11.3 19.9 0.03 0.39 1.91 2.30 0.36 0.46 0.81 — 4,723 4,723 0.14 0.19 0.21 4,782 2027 1.79 1.56 10.8 19.3 0.03 0.35 1.91 2.26 0.32 0.46 0.78 — 4,675 4,675 0.13 0.19 0.18 4,734 Average
Daily
— — — — — — — — — — — — — — — — — —
2025 1.52 1.29 10.2 13.8 0.02 0.41 2.96 3.37 0.37 1.16 1.53 — 3,091 3,091 0.10 0.09 1.56 3,121 2026 1.65 1.41 9.64 17.6 0.02 0.33 1.62 1.95 0.31 0.39 0.69 — 4,102 4,102 0.11 0.16 2.94 4,156 2027 3.96 3.92 2.15 3.84 0.01 0.08 0.30 0.37 0.07 0.07 0.14 — 823 823 0.02 0.03 0.47 833 Annual — — — — — — — — — — — — — — — — — —
2025 0.28 0.23 1.87 2.52 < 0.005 0.07 0.54 0.61 0.07 0.21 0.28 — 512 512 0.02 0.01 0.26 517 2026 0.30 0.26 1.76 3.21 < 0.005 0.06 0.30 0.36 0.06 0.07 0.13 — 679 679 0.02 0.03 0.49 688 2027 0.72 0.71 0.39 0.70 < 0.005 0.01 0.05 0.07 0.01 0.01 0.03 — 136 136 < 0.005 < 0.005 0.08 138
2.3. Construction Emissions by Y ear, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Y ear TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2025 4.03 3.39 31.7 31.5 0.06 1.37 5.32 6.69 1.26 2.68 3.93 — 6,869 6,869 0.28 0.19 8.76 6,895 2026 1.98 1.70 11.2 23.0 0.03 0.39 1.91 2.30 0.36 0.46 0.81 — 4,950 4,950 0.13 0.18 7.93 5,016 2027 38.9 38.9 6.99 10.9 0.01 0.30 0.34 0.48 0.27 0.08 0.32 — 1,705 1,705 0.06 0.02 1.10 1,713 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2025 2.02 1.72 12.0 20.6 0.03 0.44 1.91 2.35 0.41 0.46 0.86 — 4,773 4,773 0.14 0.19 0.23 4,833 2026 1.92 1.63 11.3 19.9 0.03 0.39 1.91 2.30 0.36 0.46 0.81 — 4,723 4,723 0.14 0.19 0.21 4,782 2027 1.79 1.56 10.8 19.3 0.03 0.35 1.91 2.26 0.32 0.46 0.78 — 4,675 4,675 0.13 0.19 0.18 4,734 Camino Media - University Square Custom Report, 5/27/2025 12 / 85
Average
Daily
— — — — — — — — — — — — — — — — — —
2025 1.52 1.29 10.2 13.8 0.02 0.41 1.35 1.76 0.37 0.44 0.81 — 3,091 3,091 0.10 0.09 1.56 3,121 2026 1.65 1.41 9.64 17.6 0.02 0.33 1.62 1.95 0.31 0.39 0.69 — 4,102 4,102 0.11 0.16 2.94 4,156 2027 3.96 3.92 2.15 3.84 0.01 0.08 0.30 0.37 0.07 0.07 0.14 — 823 823 0.02 0.03 0.47 833 Annual — — — — — — — — — — — — — — — — — —
2025 0.28 0.23 1.87 2.52 < 0.005 0.07 0.25 0.32 0.07 0.08 0.15 — 512 512 0.02 0.01 0.26 517 2026 0.30 0.26 1.76 3.21 < 0.005 0.06 0.30 0.36 0.06 0.07 0.13 — 679 679 0.02 0.03 0.49 688 2027 0.72 0.71 0.39 0.70 < 0.005 0.01 0.05 0.07 0.01 0.01 0.03 — 136 136 < 0.005 < 0.005 0.08 138
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 11.0 10.3 5.33 57.3 0.11 0.18 9.31 9.49 0.17 2.35 2.53 112 13,017 13,129 12.0 0.49 32.0 13,608 Mit. 11.0 10.3 5.33 57.3 0.11 0.18 9.31 9.49 0.17 2.35 2.53 112 12,550 12,662 11.9 0.48 32.0 13,136 %
Reduced
— — — — — — — — — — — — 4% 4% 1% 2% — 3%
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 9.32 8.74 5.86 35.9 0.10 0.17 9.31 9.49 0.17 2.35 2.52 112 11,873 11,985 12.1 0.53 2.27 12,446 Mit. 9.32 8.74 5.86 35.9 0.10 0.17 9.31 9.49 0.17 2.35 2.52 112 11,406 11,518 12.0 0.52 2.27 11,974 %
Reduced
— — — — — — — — — — — — 4% 4% 1% 2% — 4%
Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 9.92 9.31 5.59 42.6 0.10 0.18 9.20 9.38 0.17 2.33 2.50 112 12,196 12,308 12.0 0.51 14.7 12,775 Camino Media - University Square Custom Report, 5/27/2025 13 / 85
Mit. 9.92 9.31 5.59 42.6 0.10 0.18 9.20 9.38 0.17 2.33 2.50 112 11,729 11,841 11.9 0.50 14.7 12,303 %
Reduced
— — — — — — — — — — — — 4% 4% 1% 2% — 4%
Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.81 1.70 1.02 7.78 0.02 0.03 1.68 1.71 0.03 0.42 0.46 18.5 2,019 2,038 1.99 0.08 2.43 2,115 Mit. 1.81 1.70 1.02 7.78 0.02 0.03 1.68 1.71 0.03 0.42 0.46 18.5 1,942 1,960 1.98 0.08 2.43 2,037 %
Reduced
— — — — — — — — — — — — 4% 4% 1% 2% — 4%
Exceeds
(Annual)
— — — — — — — — — — — — — — — — — —
Threshol
d
— 10.0 10.0 100 27.0 — — 15.0 — — 15.0 — — — — — — —
Unmit. — No No No No — — No — — No — — — — — — —
Mit. — No No No No — — No — — No — — — — — — —
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 4.93 4.44 3.83 45.6 0.10 0.06 9.31 9.37 0.06 2.35 2.41 — 10,585 10,585 0.51 0.44 30.5 10,759 Area 5.88 5.82 0.11 11.1 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 0.00 30.0 30.0 < 0.005 < 0.005 — 30.2 Energy 0.16 0.08 1.40 0.62 0.01 0.11 — 0.11 0.11 — 0.11 — 2,380 2,380 0.26 0.02 — 2,391 Water — — — — — — — — — — — 16.1 21.7 37.8 1.65 0.04 — 90.8 Waste — — — — — — — — — — — 95.9 0.00 95.9 9.59 0.00 — 336 Refrig. — — — — — — — — — — — — — — — — 1.48 1.48
Total 11.0 10.3 5.33 57.3 0.11 0.18 9.31 9.49 0.17 2.35 2.53 112 13,017 13,129 12.0 0.49 32.0 13,608 Camino Media - University Square Custom Report, 5/27/2025 14 / 85
——————————————————Daily,
Winter
(Max)
Mobile 4.33 3.83 4.46 35.3 0.09 0.06 9.31 9.37 0.06 2.35 2.41 — 9,471 9,471 0.56 0.47 0.79 9,627 Area 4.83 4.83 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Energy 0.16 0.08 1.40 0.62 0.01 0.11 — 0.11 0.11 — 0.11 — 2,380 2,380 0.26 0.02 — 2,391 Water — — — — — — — — — — — 16.1 21.7 37.8 1.65 0.04 — 90.8 Waste — — — — — — — — — — — 95.9 0.00 95.9 9.59 0.00 — 336 Refrig. — — — — — — — — — — — — — — — — 1.48 1.48
Total 9.32 8.74 5.86 35.9 0.10 0.17 9.31 9.49 0.17 2.35 2.52 112 11,873 11,985 12.1 0.53 2.27 12,446 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 4.41 3.92 4.13 36.5 0.10 0.06 9.20 9.27 0.06 2.33 2.38 — 9,779 9,779 0.53 0.45 13.2 9,941 Area 5.35 5.32 0.05 5.48 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 14.8 14.8 < 0.005 < 0.005 — 14.9 Energy 0.16 0.08 1.40 0.62 0.01 0.11 — 0.11 0.11 — 0.11 — 2,380 2,380 0.26 0.02 — 2,391 Water — — — — — — — — — — — 16.1 21.7 37.8 1.65 0.04 — 90.8 Waste — — — — — — — — — — — 95.9 0.00 95.9 9.59 0.00 — 336 Refrig. — — — — — — — — — — — — — — — — 1.48 1.48
Total 9.92 9.31 5.59 42.6 0.10 0.18 9.20 9.38 0.17 2.33 2.50 112 12,196 12,308 12.0 0.51 14.7 12,775 Annual — — — — — — — — — — — — — — — — — —
Mobile 0.80 0.71 0.75 6.67 0.02 0.01 1.68 1.69 0.01 0.42 0.44 — 1,619 1,619 0.09 0.08 2.18 1,646 Area 0.98 0.97 0.01 1.00 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 2.45 2.45 < 0.005 < 0.005 — 2.46 Energy 0.03 0.01 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 394 394 0.04 < 0.005 — 396 Water — — — — — — — — — — — 2.66 3.59 6.25 0.27 0.01 — 15.0 Waste — — — — — — — — — — — 15.9 0.00 15.9 1.59 0.00 — 55.6 Refrig. — — — — — — — — — — — — — — — — 0.25 0.25
Total 1.81 1.70 1.02 7.78 0.02 0.03 1.68 1.71 0.03 0.42 0.46 18.5 2,019 2,038 1.99 0.08 2.43 2,115
2.6. Operations Emissions by Sector, Mitigated
Camino Media - University Square Custom Report, 5/27/2025 15 / 85
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 4.93 4.44 3.83 45.6 0.10 0.06 9.31 9.37 0.06 2.35 2.41 — 10,585 10,585 0.51 0.44 30.5 10,759 Area 5.88 5.82 0.11 11.1 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 0.00 30.0 30.0 < 0.005 < 0.005 — 30.2 Energy 0.16 0.08 1.40 0.62 0.01 0.11 — 0.11 0.11 — 0.11 — 1,913 1,913 0.18 0.01 — 1,919 Water — — — — — — — — — — — 16.1 21.7 37.8 1.65 0.04 — 90.8 Waste — — — — — — — — — — — 95.9 0.00 95.9 9.59 0.00 — 336 Refrig. — — — — — — — — — — — — — — — — 1.48 1.48
Total 11.0 10.3 5.33 57.3 0.11 0.18 9.31 9.49 0.17 2.35 2.53 112 12,550 12,662 11.9 0.48 32.0 13,136 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 4.33 3.83 4.46 35.3 0.09 0.06 9.31 9.37 0.06 2.35 2.41 — 9,471 9,471 0.56 0.47 0.79 9,627 Area 4.83 4.83 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Energy 0.16 0.08 1.40 0.62 0.01 0.11 — 0.11 0.11 — 0.11 — 1,913 1,913 0.18 0.01 — 1,919 Water — — — — — — — — — — — 16.1 21.7 37.8 1.65 0.04 — 90.8 Waste — — — — — — — — — — — 95.9 0.00 95.9 9.59 0.00 — 336 Refrig. — — — — — — — — — — — — — — — — 1.48 1.48
Total 9.32 8.74 5.86 35.9 0.10 0.17 9.31 9.49 0.17 2.35 2.52 112 11,406 11,518 12.0 0.52 2.27 11,974 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 4.41 3.92 4.13 36.5 0.10 0.06 9.20 9.27 0.06 2.33 2.38 — 9,779 9,779 0.53 0.45 13.2 9,941 Area 5.35 5.32 0.05 5.48 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 14.8 14.8 < 0.005 < 0.005 — 14.9 Energy 0.16 0.08 1.40 0.62 0.01 0.11 — 0.11 0.11 — 0.11 — 1,913 1,913 0.18 0.01 — 1,919 Water — — — — — — — — — — — 16.1 21.7 37.8 1.65 0.04 — 90.8 Waste — — — — — — — — — — — 95.9 0.00 95.9 9.59 0.00 — 336 Refrig. — — — — — — — — — — — — — — — — 1.48 1.48
Camino Media - University Square Custom Report, 5/27/2025 16 / 85
Total 9.92 9.31 5.59 42.6 0.10 0.18 9.20 9.38 0.17 2.33 2.50 112 11,729 11,841 11.9 0.50 14.7 12,303 Annual — — — — — — — — — — — — — — — — — —
Mobile 0.80 0.71 0.75 6.67 0.02 0.01 1.68 1.69 0.01 0.42 0.44 — 1,619 1,619 0.09 0.08 2.18 1,646 Area 0.98 0.97 0.01 1.00 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 2.45 2.45 < 0.005 < 0.005 — 2.46 Energy 0.03 0.01 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 317 317 0.03 < 0.005 — 318 Water — — — — — — — — — — — 2.66 3.59 6.25 0.27 0.01 — 15.0 Waste — — — — — — — — — — — 15.9 0.00 15.9 1.59 0.00 — 55.6 Refrig. — — — — — — — — — — — — — — — — 0.25 0.25
Total 1.81 1.70 1.02 7.78 0.02 0.03 1.68 1.71 0.03 0.42 0.46 18.5 1,942 1,960 1.98 0.08 2.43 2,037
3. Construction Emissions Details
3.1. Site Preparation (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
3.94 3.31 31.6 30.2 0.05 1.37 — 1.37 1.26 — 1.26 — 5,295 5,295 0.21 0.04 — 5,314 Dust
From
Material
Movement
— — — — — — 19.7 19.7 — 10.1 10.1 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 17 / 85
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.18 0.15 1.47 1.41 < 0.005 0.06 — 0.06 0.06 — 0.06 — 247 247 0.01 < 0.005 — 247 Dust
From
Material
Movement
— — — — — — 0.92 0.92 — 0.47 0.47 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.03 0.03 0.27 0.26 < 0.005 0.01 — 0.01 0.01 — 0.01 — 40.8 40.8 < 0.005 < 0.005 — 41.0 Dust
From
Material
Movement
— — — — — — 0.17 0.17 — 0.09 0.09 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.09 0.08 0.07 1.32 0.00 0.00 0.21 0.21 0.00 0.05 0.05 — 236 236 0.01 0.01 0.85 240 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.05 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 10.0 10.0 < 0.005 < 0.005 0.02 10.2 Camino Media - University Square Custom Report, 5/27/2025 18 / 85
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.66 1.66 < 0.005 < 0.005 < 0.005 1.68 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.2. Site Preparation (2025) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
3.94 3.31 31.6 30.2 0.05 1.37 — 1.37 1.26 — 1.26 — 5,295 5,295 0.21 0.04 — 5,314 Dust
From
Material
Movement
— — — — — — 5.11 5.11 — 2.63 2.63 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.18 0.15 1.47 1.41 < 0.005 0.06 — 0.06 0.06 — 0.06 — 247 247 0.01 < 0.005 — 247 Camino Media - University Square Custom Report, 5/27/2025 19 / 85
———————0.120.12—0.240.24——————Dust
From
Material
Movement
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.03 0.03 0.27 0.26 < 0.005 0.01 — 0.01 0.01 — 0.01 — 40.8 40.8 < 0.005 < 0.005 — 41.0 Dust
From
Material
Movement
— — — — — — 0.04 0.04 — 0.02 0.02 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.09 0.08 0.07 1.32 0.00 0.00 0.21 0.21 0.00 0.05 0.05 — 236 236 0.01 0.01 0.85 240 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.05 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 10.0 10.0 < 0.005 < 0.005 0.02 10.2 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.66 1.66 < 0.005 < 0.005 < 0.005 1.68 Camino Media - University Square Custom Report, 5/27/2025 20 / 85
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.3. Grading (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
3.80 3.20 29.7 28.3 0.06 1.23 — 1.23 1.14 — 1.14 — 6,599 6,599 0.27 0.05 — 6,622 Dust
From
Material
Movement
— — — — — — 9.20 9.20 — 3.65 3.65 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.52 0.44 4.07 3.88 0.01 0.17 — 0.17 0.16 — 0.16 — 904 904 0.04 0.01 — 907 Dust
From
Material
Movement
— — — — — — 1.26 1.26 — 0.50 0.50 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Camino Media - University Square Custom Report, 5/27/2025 21 / 85
Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.10 0.08 0.74 0.71 < 0.005 0.03 — 0.03 0.03 — 0.03 — 150 150 0.01 < 0.005 — 150 Dust
From
Material
Movement
— — — — — — 0.23 0.23 — 0.09 0.09 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.10 0.09 0.08 1.51 0.00 0.00 0.24 0.24 0.00 0.06 0.06 — 270 270 0.01 0.01 0.97 274 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.15 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 33.7 33.7 < 0.005 < 0.005 0.06 34.1 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 5.57 5.57 < 0.005 < 0.005 0.01 5.65 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.4. Grading (2025) - Mitigated
Camino Media - University Square Custom Report, 5/27/2025 22 / 85
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
3.80 3.20 29.7 28.3 0.06 1.23 — 1.23 1.14 — 1.14 — 6,599 6,599 0.27 0.05 — 6,622 Dust
From
Material
Movement
— — — — — — 2.39 2.39 — 0.95 0.95 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.52 0.44 4.07 3.88 0.01 0.17 — 0.17 0.16 — 0.16 — 904 904 0.04 0.01 — 907 Dust
From
Material
Movement
— — — — — — 0.33 0.33 — 0.13 0.13 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.10 0.08 0.74 0.71 < 0.005 0.03 — 0.03 0.03 — 0.03 — 150 150 0.01 < 0.005 — 150 Camino Media - University Square Custom Report, 5/27/2025 23 / 85
———————0.020.02—0.060.06——————Dust
From
Material
Movement
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.10 0.09 0.08 1.51 0.00 0.00 0.24 0.24 0.00 0.06 0.06 — 270 270 0.01 0.01 0.97 274 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.15 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 33.7 33.7 < 0.005 < 0.005 0.06 34.1 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 5.57 5.57 < 0.005 < 0.005 0.01 5.65 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.5. Building Construction (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 24 / 85
——————————————————Daily,
Summer
(Max)
Off-Roa
d
Equipm
ent
1.35 1.13 10.4 13.0 0.02 0.43 — 0.43 0.40 — 0.40 — 2,398 2,398 0.10 0.02 — 2,406 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.35 1.13 10.4 13.0 0.02 0.43 — 0.43 0.40 — 0.40 — 2,398 2,398 0.10 0.02 — 2,406 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.53 0.44 4.10 5.11 0.01 0.17 — 0.17 0.16 — 0.16 — 940 940 0.04 0.01 — 944 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.10 0.08 0.75 0.93 < 0.005 0.03 — 0.03 0.03 — 0.03 — 156 156 0.01 < 0.005 — 156 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 25 / 85
Worker 0.72 0.66 0.58 10.6 0.00 0.00 1.72 1.72 0.00 0.40 0.40 — 1,896 1,896 0.08 0.07 6.80 1,925 Vendor 0.03 0.02 0.81 0.27 0.01 0.01 0.19 0.20 0.01 0.05 0.06 — 711 711 0.01 0.11 1.96 745 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.64 0.57 0.71 7.28 0.00 0.00 1.72 1.72 0.00 0.40 0.40 — 1,663 1,663 0.03 0.07 0.18 1,684 Vendor 0.03 0.02 0.87 0.27 0.01 0.01 0.19 0.20 0.01 0.05 0.06 — 712 712 0.01 0.11 0.05 744 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.26 0.23 0.25 3.10 0.00 0.00 0.67 0.67 0.00 0.16 0.16 — 678 678 0.01 0.03 1.15 687 Vendor 0.01 0.01 0.33 0.11 < 0.005 < 0.005 0.07 0.08 < 0.005 0.02 0.02 — 279 279 < 0.005 0.04 0.33 292 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.05 0.04 0.05 0.57 0.00 0.00 0.12 0.12 0.00 0.03 0.03 — 112 112 < 0.005 < 0.005 0.19 114 Vendor < 0.005 < 0.005 0.06 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 46.2 46.2 < 0.005 0.01 0.06 48.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.6. Building Construction (2025) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.35 1.13 10.4 13.0 0.02 0.43 — 0.43 0.40 — 0.40 — 2,398 2,398 0.10 0.02 — 2,406 Camino Media - University Square Custom Report, 5/27/2025 26 / 85
0.000.000.000.000.000.00—0.000.000.000.000.000.000.000.000.000.000.00Onsite truck
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.35 1.13 10.4 13.0 0.02 0.43 — 0.43 0.40 — 0.40 — 2,398 2,398 0.10 0.02 — 2,406 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.53 0.44 4.10 5.11 0.01 0.17 — 0.17 0.16 — 0.16 — 940 940 0.04 0.01 — 944 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.10 0.08 0.75 0.93 < 0.005 0.03 — 0.03 0.03 — 0.03 — 156 156 0.01 < 0.005 — 156 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.72 0.66 0.58 10.6 0.00 0.00 1.72 1.72 0.00 0.40 0.40 — 1,896 1,896 0.08 0.07 6.80 1,925 Vendor 0.03 0.02 0.81 0.27 0.01 0.01 0.19 0.20 0.01 0.05 0.06 — 711 711 0.01 0.11 1.96 745 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 27 / 85
Worker 0.64 0.57 0.71 7.28 0.00 0.00 1.72 1.72 0.00 0.40 0.40 — 1,663 1,663 0.03 0.07 0.18 1,684 Vendor 0.03 0.02 0.87 0.27 0.01 0.01 0.19 0.20 0.01 0.05 0.06 — 712 712 0.01 0.11 0.05 744 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.26 0.23 0.25 3.10 0.00 0.00 0.67 0.67 0.00 0.16 0.16 — 678 678 0.01 0.03 1.15 687 Vendor 0.01 0.01 0.33 0.11 < 0.005 < 0.005 0.07 0.08 < 0.005 0.02 0.02 — 279 279 < 0.005 0.04 0.33 292 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.05 0.04 0.05 0.57 0.00 0.00 0.12 0.12 0.00 0.03 0.03 — 112 112 < 0.005 < 0.005 0.19 114 Vendor < 0.005 < 0.005 0.06 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 46.2 46.2 < 0.005 0.01 0.06 48.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.7. Building Construction (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.28 1.07 9.85 13.0 0.02 0.38 — 0.38 0.35 — 0.35 — 2,397 2,397 0.10 0.02 — 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 28 / 85
2,405—0.020.102,3972,397—0.35—0.350.38—0.380.0213.09.851.071.28Off-Roa d
Equipm
ent
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.10 0.92 8.45 11.1 0.02 0.32 — 0.32 0.30 — 0.30 — 2,055 2,055 0.08 0.02 — 2,062 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.20 0.17 1.54 2.03 < 0.005 0.06 — 0.06 0.05 — 0.05 — 340 340 0.01 < 0.005 — 341 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.67 0.61 0.53 9.76 0.00 0.00 1.72 1.72 0.00 0.40 0.40 — 1,856 1,856 0.02 0.06 6.12 1,881 Vendor 0.03 0.02 0.78 0.25 0.01 0.01 0.19 0.20 0.01 0.05 0.06 — 697 697 0.01 0.10 1.81 729 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.61 0.54 0.65 6.67 0.00 0.00 1.72 1.72 0.00 0.40 0.40 — 1,628 1,628 0.03 0.07 0.16 1,649 Vendor 0.03 0.02 0.83 0.26 0.01 0.01 0.19 0.20 0.01 0.05 0.06 — 698 698 0.01 0.10 0.05 728 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Camino Media - University Square Custom Report, 5/27/2025 29 / 85
——————————————————Average
Daily
Worker 0.53 0.47 0.50 6.24 0.00 0.00 1.46 1.46 0.00 0.34 0.34 — 1,450 1,450 0.02 0.06 2.27 1,469 Vendor 0.02 0.02 0.70 0.22 < 0.005 0.01 0.16 0.17 0.01 0.05 0.05 — 598 598 0.01 0.09 0.67 624 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.10 0.09 0.09 1.14 0.00 0.00 0.27 0.27 0.00 0.06 0.06 — 240 240 < 0.005 0.01 0.38 243 Vendor < 0.005 < 0.005 0.13 0.04 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 99.0 99.0 < 0.005 0.01 0.11 103 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.8. Building Construction (2026) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.28 1.07 9.85 13.0 0.02 0.38 — 0.38 0.35 — 0.35 — 2,397 2,397 0.10 0.02 — 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.28 1.07 9.85 13.0 0.02 0.38 — 0.38 0.35 — 0.35 — 2,397 2,397 0.10 0.02 — 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Camino Media - University Square Custom Report, 5/27/2025 30 / 85
——————————————————Average
Daily
Off-Roa
d
Equipm
ent
1.10 0.92 8.45 11.1 0.02 0.32 — 0.32 0.30 — 0.30 — 2,055 2,055 0.08 0.02 — 2,062 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.20 0.17 1.54 2.03 < 0.005 0.06 — 0.06 0.05 — 0.05 — 340 340 0.01 < 0.005 — 341 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.67 0.61 0.53 9.76 0.00 0.00 1.72 1.72 0.00 0.40 0.40 — 1,856 1,856 0.02 0.06 6.12 1,881 Vendor 0.03 0.02 0.78 0.25 0.01 0.01 0.19 0.20 0.01 0.05 0.06 — 697 697 0.01 0.10 1.81 729 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.61 0.54 0.65 6.67 0.00 0.00 1.72 1.72 0.00 0.40 0.40 — 1,628 1,628 0.03 0.07 0.16 1,649 Vendor 0.03 0.02 0.83 0.26 0.01 0.01 0.19 0.20 0.01 0.05 0.06 — 698 698 0.01 0.10 0.05 728 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.53 0.47 0.50 6.24 0.00 0.00 1.46 1.46 0.00 0.34 0.34 — 1,450 1,450 0.02 0.06 2.27 1,469 Vendor 0.02 0.02 0.70 0.22 < 0.005 0.01 0.16 0.17 0.01 0.05 0.05 — 598 598 0.01 0.09 0.67 624 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 31 / 85
Worker 0.10 0.09 0.09 1.14 0.00 0.00 0.27 0.27 0.00 0.06 0.06 — 240 240 < 0.005 0.01 0.38 243 Vendor < 0.005 < 0.005 0.13 0.04 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 99.0 99.0 < 0.005 0.01 0.11 103 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.9. Building Construction (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.23 1.03 9.39 12.9 0.02 0.34 — 0.34 0.31 — 0.31 — 2,397 2,397 0.10 0.02 — 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.16 0.14 1.23 1.70 < 0.005 0.04 — 0.04 0.04 — 0.04 — 315 315 0.01 < 0.005 — 316 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.03 0.02 0.23 0.31 < 0.005 0.01 — 0.01 0.01 — 0.01 — 52.2 52.2 < 0.005 < 0.005 — 52.4 Camino Media - University Square Custom Report, 5/27/2025 32 / 85
0.000.000.000.000.000.00—0.000.000.000.000.000.000.000.000.000.000.00Onsite truck
Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.53 0.51 0.59 6.12 0.00 0.00 1.72 1.72 0.00 0.40 0.40 — 1,596 1,596 0.03 0.07 0.14 1,616 Vendor 0.03 0.02 0.80 0.25 0.01 0.01 0.19 0.20 0.01 0.05 0.06 — 682 682 0.01 0.10 0.04 712 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.07 0.07 0.07 0.88 0.00 0.00 0.22 0.22 0.00 0.05 0.05 — 218 218 < 0.005 0.01 0.31 221 Vendor < 0.005 < 0.005 0.10 0.03 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 89.7 89.7 < 0.005 0.01 0.09 93.7 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.16 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 36.1 36.1 < 0.005 < 0.005 0.05 36.6 Vendor < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 14.8 14.8 < 0.005 < 0.005 0.02 15.5 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.10. Building Construction (2027) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 33 / 85
Off-Roa
Equipment
1.23 1.03 9.39 12.9 0.02 0.34 — 0.34 0.31 — 0.31 — 2,397 2,397 0.10 0.02 — 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.16 0.14 1.23 1.70 < 0.005 0.04 — 0.04 0.04 — 0.04 — 315 315 0.01 < 0.005 — 316 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.03 0.02 0.23 0.31 < 0.005 0.01 — 0.01 0.01 — 0.01 — 52.2 52.2 < 0.005 < 0.005 — 52.4 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.53 0.51 0.59 6.12 0.00 0.00 1.72 1.72 0.00 0.40 0.40 — 1,596 1,596 0.03 0.07 0.14 1,616 Vendor 0.03 0.02 0.80 0.25 0.01 0.01 0.19 0.20 0.01 0.05 0.06 — 682 682 0.01 0.10 0.04 712 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.07 0.07 0.07 0.88 0.00 0.00 0.22 0.22 0.00 0.05 0.05 — 218 218 < 0.005 0.01 0.31 221 Vendor < 0.005 < 0.005 0.10 0.03 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 89.7 89.7 < 0.005 0.01 0.09 93.7 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Camino Media - University Square Custom Report, 5/27/2025 34 / 85
Annual — — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.16 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 36.1 36.1 < 0.005 < 0.005 0.05 36.6 Vendor < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 14.8 14.8 < 0.005 < 0.005 0.02 15.5 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.11. Paving (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.88 0.74 6.94 9.95 0.01 0.30 — 0.30 0.27 — 0.27 — 1,511 1,511 0.06 0.01 — 1,516 Paving 0.13 0.13 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.88 0.74 6.94 9.95 0.01 0.30 — 0.30 0.27 — 0.27 — 1,511 1,511 0.06 0.01 — 1,516 Paving 0.13 0.13 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 35 / 85
141—< 0.0050.01141141—0.03—0.030.03—0.03< 0.0050.930.650.070.08Off-Roa d
Equipm
ent
Paving 0.01 0.01 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.12 0.17 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 — 23.3 23.3 < 0.005 < 0.005 — 23.4 Paving < 0.005 < 0.005 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.06 0.05 0.96 0.00 0.00 0.18 0.18 0.00 0.04 0.04 — 194 194 < 0.005 0.01 0.59 197 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.06 0.65 0.00 0.00 0.18 0.18 0.00 0.04 0.04 — 170 170 < 0.005 0.01 0.02 172 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.07 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 16.5 16.5 < 0.005 < 0.005 0.02 16.7 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Camino Media - University Square Custom Report, 5/27/2025 36 / 85
Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.73 2.73 < 0.005 < 0.005 < 0.005 2.76 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.12. Paving (2027) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.88 0.74 6.94 9.95 0.01 0.30 — 0.30 0.27 — 0.27 — 1,511 1,511 0.06 0.01 — 1,516 Paving 0.13 0.13 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.88 0.74 6.94 9.95 0.01 0.30 — 0.30 0.27 — 0.27 — 1,511 1,511 0.06 0.01 — 1,516 Paving 0.13 0.13 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 37 / 85
141—< 0.0050.01141141—0.03—0.030.03—0.03< 0.0050.930.650.070.08Off-Roa d
Equipm
ent
Paving 0.01 0.01 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.12 0.17 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 — 23.3 23.3 < 0.005 < 0.005 — 23.4 Paving < 0.005 < 0.005 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.06 0.05 0.96 0.00 0.00 0.18 0.18 0.00 0.04 0.04 — 194 194 < 0.005 0.01 0.59 197 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.06 0.65 0.00 0.00 0.18 0.18 0.00 0.04 0.04 — 170 170 < 0.005 0.01 0.02 172 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.07 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 16.5 16.5 < 0.005 < 0.005 0.02 16.7 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Camino Media - University Square Custom Report, 5/27/2025 38 / 85
Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.73 2.73 < 0.005 < 0.005 < 0.005 2.76 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.13. Architectural Coating (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.14 0.11 0.83 1.13 < 0.005 0.02 — 0.02 0.02 — 0.02 — 134 134 0.01 < 0.005 — 134 Architect
ural
Coating
s
38.7 38.7 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.08 0.10 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 12.4 12.4 < 0.005 < 0.005 — 12.5 Architect
ural
Coating
s
3.60 3.60 — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 39 / 85
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
< 0.005 < 0.005 0.01 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 2.06 2.06 < 0.005 < 0.005 — 2.07 Architect
ural
Coating
s
0.66 0.66 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.12 0.12 0.09 1.80 0.00 0.00 0.34 0.34 0.00 0.08 0.08 — 364 364 < 0.005 0.01 1.10 369 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.12 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 30.9 30.9 < 0.005 < 0.005 0.04 31.3 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 5.11 5.11 < 0.005 < 0.005 0.01 5.18 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Camino Media - University Square Custom Report, 5/27/2025 40 / 85
3.14. Architectural Coating (2027) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.14 0.11 0.83 1.13 < 0.005 0.02 — 0.02 0.02 — 0.02 — 134 134 0.01 < 0.005 — 134 Architect
ural
Coating
s
38.7 38.7 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.08 0.10 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 12.4 12.4 < 0.005 < 0.005 — 12.5 Architect
ural
Coating
s
3.60 3.60 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 41 / 85
2.07—< 0.005< 0.0052.062.06—< 0.005—< 0.005< 0.005—< 0.005< 0.0050.020.01< 0.005< 0.005Off-Roa d
Equipm
ent
Architect
ural
Coating
s
0.66 0.66 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.12 0.12 0.09 1.80 0.00 0.00 0.34 0.34 0.00 0.08 0.08 — 364 364 < 0.005 0.01 1.10 369 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.12 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 30.9 30.9 < 0.005 < 0.005 0.04 31.3 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 5.11 5.11 < 0.005 < 0.005 0.01 5.18 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
4. Operations Emissions Details
Camino Media - University Square Custom Report, 5/27/2025 42 / 85
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
4.93 4.44 3.83 45.6 0.10 0.06 9.31 9.37 0.06 2.35 2.41 — 10,585 10,585 0.51 0.44 30.5 10,759 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Recreati
onal
Swimmi
ng
Pool
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Health
Club
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 General
Office
Building
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 4.93 4.44 3.83 45.6 0.10 0.06 9.31 9.37 0.06 2.35 2.41 — 10,585 10,585 0.51 0.44 30.5 10,759 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
4.33 3.83 4.46 35.3 0.09 0.06 9.31 9.37 0.06 2.35 2.41 — 9,471 9,471 0.56 0.47 0.79 9,627 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Camino Media - University Square Custom Report, 5/27/2025 43 / 85
0.000.000.000.000.000.00—0.000.000.000.000.000.000.000.000.000.000.00Recreati onal
Swimmi
ng
Health
Club
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 General
Office
Building
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 4.33 3.83 4.46 35.3 0.09 0.06 9.31 9.37 0.06 2.35 2.41 — 9,471 9,471 0.56 0.47 0.79 9,627 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
0.80 0.71 0.75 6.67 0.02 0.01 1.68 1.69 0.01 0.42 0.44 — 1,619 1,619 0.09 0.08 2.18 1,646 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Recreati
onal
Swimmi
ng
Pool
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Health
Club
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 General
Office
Building
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.80 0.71 0.75 6.67 0.02 0.01 1.68 1.69 0.01 0.42 0.44 — 1,619 1,619 0.09 0.08 2.18 1,646
4.1.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 44 / 85
Apartme
Low
Rise
4.93 4.44 3.83 45.6 0.10 0.06 9.31 9.37 0.06 2.35 2.41 — 10,585 10,585 0.51 0.44 30.5 10,759 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Recreati
onal
Swimmi
ng
Pool
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Health
Club
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 General
Office
Building
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 4.93 4.44 3.83 45.6 0.10 0.06 9.31 9.37 0.06 2.35 2.41 — 10,585 10,585 0.51 0.44 30.5 10,759 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
4.33 3.83 4.46 35.3 0.09 0.06 9.31 9.37 0.06 2.35 2.41 — 9,471 9,471 0.56 0.47 0.79 9,627 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Recreati
onal
Swimmi
ng
Pool
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Health
Club
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 General
Office
Building
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 4.33 3.83 4.46 35.3 0.09 0.06 9.31 9.37 0.06 2.35 2.41 — 9,471 9,471 0.56 0.47 0.79 9,627 Annual — — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 45 / 85
1,6462.180.080.091,6191,619—0.440.420.011.691.680.010.026.670.750.710.80Apartme nts
Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Recreati
onal
Swimmi
ng
Pool
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Health
Club
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 General
Office
Building
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.80 0.71 0.75 6.67 0.02 0.01 1.68 1.69 0.01 0.42 0.44 — 1,619 1,619 0.09 0.08 2.18 1,646
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — — 525 525 0.08 0.01 — 530
Parking
Lot
— — — — — — — — — — — — 35.5 35.5 0.01 < 0.005 — 35.9
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Camino Media - University Square Custom Report, 5/27/2025 46 / 85
Health
Club
— — — — — — — — — — — — 29.8 29.8 < 0.005 < 0.005 — 30.1 General
Office
Building
— — — — — — — — — — — — 19.7 19.7 < 0.005 < 0.005 — 19.8 Total — — — — — — — — — — — — 610 610 0.10 0.01 — 616
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — — 525 525 0.08 0.01 — 530
Parking
Lot
— — — — — — — — — — — — 35.5 35.5 0.01 < 0.005 — 35.9
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Health
Club
— — — — — — — — — — — — 29.8 29.8 < 0.005 < 0.005 — 30.1 General
Office
Building
— — — — — — — — — — — — 19.7 19.7 < 0.005 < 0.005 — 19.8 Total — — — — — — — — — — — — 610 610 0.10 0.01 — 616
Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — — 86.9 86.9 0.01 < 0.005 — 87.7
Parking
Lot
— — — — — — — — — — — — 5.88 5.88 < 0.005 < 0.005 — 5.94 Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Camino Media - University Square Custom Report, 5/27/2025 47 / 85
4.99—< 0.005< 0.0054.944.94————————————Health
Club
General
Office
Building
— — — — — — — — — — — — 3.25 3.25 < 0.005 < 0.005 — 3.29 Total — — — — — — — — — — — — 101 101 0.02 < 0.005 — 102
4.2.2. Electricity Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — — 57.1 57.1 0.01 < 0.005 — 57.7
Parking
Lot
— — — — — — — — — — — — 35.5 35.5 0.01 < 0.005 — 35.9
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Health
Club
— — — — — — — — — — — — 29.8 29.8 < 0.005 < 0.005 — 30.1 General
Office
Building
— — — — — — — — — — — — 19.7 19.7 < 0.005 < 0.005 — 19.8 Total — — — — — — — — — — — — 142 142 0.02 < 0.005 — 143 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — — 57.1 57.1 0.01 < 0.005 — 57.7
Camino Media - University Square Custom Report, 5/27/2025 48 / 85
Parking
Lot
— — — — — — — — — — — — 35.5 35.5 0.01 < 0.005 — 35.9
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Health
Club
— — — — — — — — — — — — 29.8 29.8 < 0.005 < 0.005 — 30.1 General
Office
Building
— — — — — — — — — — — — 19.7 19.7 < 0.005 < 0.005 — 19.8 Total — — — — — — — — — — — — 142 142 0.02 < 0.005 — 143 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — — 9.45 9.45 < 0.005 < 0.005 — 9.55 Parking
Lot
— — — — — — — — — — — — 5.88 5.88 < 0.005 < 0.005 — 5.94 Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Health
Club
— — — — — — — — — — — — 4.94 4.94 < 0.005 < 0.005 — 4.99 General
Office
Building
— — — — — — — — — — — — 3.25 3.25 < 0.005 < 0.005 — 3.29 Total — — — — — — — — — — — — 23.5 23.5 < 0.005 < 0.005 — 23.8
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Camino Media - University Square Custom Report, 5/27/2025 49 / 85
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
0.16 0.08 1.33 0.57 0.01 0.11 — 0.11 0.11 — 0.11 — 1,692 1,692 0.15 < 0.005 — 1,697 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Recreati
onal
Swimmi
ng
Pool
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Health
Club
0.01 < 0.005 0.05 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 59.1 59.1 0.01 < 0.005 — 59.3 General
Office
Building
< 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 19.2 19.2 < 0.005 < 0.005 — 19.3 Total 0.16 0.08 1.40 0.62 0.01 0.11 — 0.11 0.11 — 0.11 — 1,771 1,771 0.16 < 0.005 — 1,776 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
0.16 0.08 1.33 0.57 0.01 0.11 — 0.11 0.11 — 0.11 — 1,692 1,692 0.15 < 0.005 — 1,697 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Recreati
onal
Swimmi
ng
Pool
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Health
Club
0.01 < 0.005 0.05 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 59.1 59.1 0.01 < 0.005 — 59.3 General
Office
Building
< 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 19.2 19.2 < 0.005 < 0.005 — 19.3 Camino Media - University Square Custom Report, 5/27/2025 50 / 85
Total 0.16 0.08 1.40 0.62 0.01 0.11 — 0.11 0.11 — 0.11 — 1,771 1,771 0.16 < 0.005 — 1,776 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
0.03 0.01 0.24 0.10 < 0.005 0.02 — 0.02 0.02 — 0.02 — 280 280 0.02 < 0.005 — 281 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Recreati
onal
Swimmi
ng
Pool
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Health
Club
< 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 9.78 9.78 < 0.005 < 0.005 — 9.81 General
Office
Building
< 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 3.18 3.18 < 0.005 < 0.005 — 3.19 Total 0.03 0.01 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 293 293 0.03 < 0.005 — 294
4.2.4. Natural Gas Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
0.16 0.08 1.33 0.57 0.01 0.11 — 0.11 0.11 — 0.11 — 1,692 1,692 0.15 < 0.005 — 1,697 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Recreati
onal
Swimmi
ng
Pool
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Camino Media - University Square Custom Report, 5/27/2025 51 / 85
Health
Club
0.01 < 0.005 0.05 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 59.1 59.1 0.01 < 0.005 — 59.3 General
Office
Building
< 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 19.2 19.2 < 0.005 < 0.005 — 19.3 Total 0.16 0.08 1.40 0.62 0.01 0.11 — 0.11 0.11 — 0.11 — 1,771 1,771 0.16 < 0.005 — 1,776 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
0.16 0.08 1.33 0.57 0.01 0.11 — 0.11 0.11 — 0.11 — 1,692 1,692 0.15 < 0.005 — 1,697 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Recreati
onal
Swimmi
ng
Pool
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Health
Club
0.01 < 0.005 0.05 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 59.1 59.1 0.01 < 0.005 — 59.3 General
Office
Building
< 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 19.2 19.2 < 0.005 < 0.005 — 19.3 Total 0.16 0.08 1.40 0.62 0.01 0.11 — 0.11 0.11 — 0.11 — 1,771 1,771 0.16 < 0.005 — 1,776 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
0.03 0.01 0.24 0.10 < 0.005 0.02 — 0.02 0.02 — 0.02 — 280 280 0.02 < 0.005 — 281 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Recreati
onal
Swimmi
ng
Pool
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Camino Media - University Square Custom Report, 5/27/2025 52 / 85
9.81—< 0.005< 0.0059.789.78—< 0.005—< 0.005< 0.005—< 0.005< 0.0050.010.01< 0.005< 0.005Health Club
General
Office
Building
< 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 3.18 3.18 < 0.005 < 0.005 — 3.19 Total 0.03 0.01 0.26 0.11 < 0.005 0.02 — 0.02 0.02 — 0.02 — 293 293 0.03 < 0.005 — 294
4.3. Area Emissions by Source
4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consum
er
Product
s
4.47 4.47 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.36 0.36 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
1.05 0.99 0.11 11.1 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 — 30.0 30.0 < 0.005 < 0.005 — 30.2 Total 5.88 5.82 0.11 11.1 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 0.00 30.0 30.0 < 0.005 < 0.005 — 30.2 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Camino Media - University Square Custom Report, 5/27/2025 53 / 85
————————————————4.474.47Consum
er
Product
Architect
ural
Coating
s
0.36 0.36 — — — — — — — — — — — — — — — —
Total 4.83 4.83 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Annual — — — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consum
er
Product
s
0.82 0.82 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.07 0.07 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
0.09 0.09 0.01 1.00 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 2.45 2.45 < 0.005 < 0.005 — 2.46 Total 0.98 0.97 0.01 1.00 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 2.45 2.45 < 0.005 < 0.005 — 2.46
4.3.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consum
er
Product
s
4.47 4.47 — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 54 / 85
Architect
Coatings
0.36 0.36 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
1.05 0.99 0.11 11.1 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 — 30.0 30.0 < 0.005 < 0.005 — 30.2 Total 5.88 5.82 0.11 11.1 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 0.00 30.0 30.0 < 0.005 < 0.005 — 30.2 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consum
er
Product
s
4.47 4.47 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.36 0.36 — — — — — — — — — — — — — — — —
Total 4.83 4.83 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Annual — — — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consum
er
Product
s
0.82 0.82 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.07 0.07 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
0.09 0.09 0.01 1.00 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 2.45 2.45 < 0.005 < 0.005 — 2.46 Total 0.98 0.97 0.01 1.00 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 2.45 2.45 < 0.005 < 0.005 — 2.46 Camino Media - University Square Custom Report, 5/27/2025 55 / 85
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — 14.8 20.3 35.2 1.53 0.04 — 84.2
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — 0.19 0.22 0.41 0.02 < 0.005 — 1.05 Health
Club
— — — — — — — — — — — 0.51 0.59 1.10 0.05 < 0.005 — 2.78 General
Office
Building
— — — — — — — — — — — 0.51 0.59 1.10 0.05 < 0.005 — 2.78 Total — — — — — — — — — — — 16.1 21.7 37.8 1.65 0.04 — 90.8 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — 14.8 20.3 35.2 1.53 0.04 — 84.2
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Camino Media - University Square Custom Report, 5/27/2025 56 / 85
1.05—< 0.0050.020.410.220.19———————————Recreati
onal
Swimmi
ng
Health
Club
— — — — — — — — — — — 0.51 0.59 1.10 0.05 < 0.005 — 2.78 General
Office
Building
— — — — — — — — — — — 0.51 0.59 1.10 0.05 < 0.005 — 2.78 Total — — — — — — — — — — — 16.1 21.7 37.8 1.65 0.04 — 90.8 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — 2.46 3.36 5.82 0.25 0.01 — 13.9
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — 0.03 0.04 0.07 < 0.005 < 0.005 — 0.17 Health
Club
— — — — — — — — — — — 0.08 0.10 0.18 0.01 < 0.005 — 0.46 General
Office
Building
— — — — — — — — — — — 0.08 0.10 0.18 0.01 < 0.005 — 0.46 Total — — — — — — — — — — — 2.66 3.59 6.25 0.27 0.01 — 15.0
4.4.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 57 / 85
Apartme
Low
Rise
— — — — — — — — — — — 14.8 20.3 35.2 1.53 0.04 — 84.2
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — 0.19 0.22 0.41 0.02 < 0.005 — 1.05 Health
Club
— — — — — — — — — — — 0.51 0.59 1.10 0.05 < 0.005 — 2.78 General
Office
Building
— — — — — — — — — — — 0.51 0.59 1.10 0.05 < 0.005 — 2.78 Total — — — — — — — — — — — 16.1 21.7 37.8 1.65 0.04 — 90.8 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — 14.8 20.3 35.2 1.53 0.04 — 84.2
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — 0.19 0.22 0.41 0.02 < 0.005 — 1.05 Health
Club
— — — — — — — — — — — 0.51 0.59 1.10 0.05 < 0.005 — 2.78 General
Office
Building
— — — — — — — — — — — 0.51 0.59 1.10 0.05 < 0.005 — 2.78 Total — — — — — — — — — — — 16.1 21.7 37.8 1.65 0.04 — 90.8 Annual — — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 58 / 85
13.9—0.010.255.823.362.46———————————Apartme
nts
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — 0.03 0.04 0.07 < 0.005 < 0.005 — 0.17 Health
Club
— — — — — — — — — — — 0.08 0.10 0.18 0.01 < 0.005 — 0.46 General
Office
Building
— — — — — — — — — — — 0.08 0.10 0.18 0.01 < 0.005 — 0.46 Total — — — — — — — — — — — 2.66 3.59 6.25 0.27 0.01 — 15.0
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — 76.1 0.00 76.1 7.61 0.00 — 266
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — 5.22 0.00 5.22 0.52 0.00 — 18.3
Camino Media - University Square Custom Report, 5/27/2025 59 / 85
Health
Club
— — — — — — — — — — — 13.8 0.00 13.8 1.38 0.00 — 48.4
General
Office
Building
— — — — — — — — — — — 0.75 0.00 0.75 0.08 0.00 — 2.63
Total — — — — — — — — — — — 95.9 0.00 95.9 9.59 0.00 — 336 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — 76.1 0.00 76.1 7.61 0.00 — 266
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — 5.22 0.00 5.22 0.52 0.00 — 18.3
Health
Club
— — — — — — — — — — — 13.8 0.00 13.8 1.38 0.00 — 48.4
General
Office
Building
— — — — — — — — — — — 0.75 0.00 0.75 0.08 0.00 — 2.63
Total — — — — — — — — — — — 95.9 0.00 95.9 9.59 0.00 — 336 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — 12.6 0.00 12.6 1.26 0.00 — 44.1
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — 0.86 0.00 0.86 0.09 0.00 — 3.02
Camino Media - University Square Custom Report, 5/27/2025 60 / 85
8.01—0.000.232.290.002.29———————————Health
Club
General
Office
Building
— — — — — — — — — — — 0.12 0.00 0.12 0.01 0.00 — 0.44
Total — — — — — — — — — — — 15.9 0.00 15.9 1.59 0.00 — 55.6
4.5.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — 76.1 0.00 76.1 7.61 0.00 — 266
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — 5.22 0.00 5.22 0.52 0.00 — 18.3
Health
Club
— — — — — — — — — — — 13.8 0.00 13.8 1.38 0.00 — 48.4
General
Office
Building
— — — — — — — — — — — 0.75 0.00 0.75 0.08 0.00 — 2.63
Total — — — — — — — — — — — 95.9 0.00 95.9 9.59 0.00 — 336 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — 76.1 0.00 76.1 7.61 0.00 — 266
Camino Media - University Square Custom Report, 5/27/2025 61 / 85
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — 5.22 0.00 5.22 0.52 0.00 — 18.3
Health
Club
— — — — — — — — — — — 13.8 0.00 13.8 1.38 0.00 — 48.4
General
Office
Building
— — — — — — — — — — — 0.75 0.00 0.75 0.08 0.00 — 2.63
Total — — — — — — — — — — — 95.9 0.00 95.9 9.59 0.00 — 336 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — 12.6 0.00 12.6 1.26 0.00 — 44.1
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — 0.86 0.00 0.86 0.09 0.00 — 3.02
Health
Club
— — — — — — — — — — — 2.29 0.00 2.29 0.23 0.00 — 8.01
General
Office
Building
— — — — — — — — — — — 0.12 0.00 0.12 0.01 0.00 — 0.44
Total — — — — — — — — — — — 15.9 0.00 15.9 1.59 0.00 — 55.6
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Camino Media - University Square Custom Report, 5/27/2025 62 / 85
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — — — — — — 1.45 1.45
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — — — — — — 0.01 0.01
Health
Club
— — — — — — — — — — — — — — — — 0.02 0.02
General
Office
Building
— — — — — — — — — — — — — — — — < 0.005 < 0.005
Total — — — — — — — — — — — — — — — — 1.48 1.48
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — — — — — — 1.45 1.45
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — — — — — — 0.01 0.01
Health
Club
— — — — — — — — — — — — — — — — 0.02 0.02
General
Office
Building
— — — — — — — — — — — — — — — — < 0.005 < 0.005
Total — — — — — — — — — — — — — — — — 1.48 1.48
Annual — — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 63 / 85
Apartme
Low
Rise
— — — — — — — — — — — — — — — — 0.24 0.24
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — — — — — — < 0.005 < 0.005
Health
Club
— — — — — — — — — — — — — — — — < 0.005 < 0.005
General
Office
Building
— — — — — — — — — — — — — — — — < 0.005 < 0.005
Total — — — — — — — — — — — — — — — — 0.25 0.25
4.6.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — — — — — — 1.45 1.45
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — — — — — — 0.01 0.01
Health
Club
— — — — — — — — — — — — — — — — 0.02 0.02
General
Office
Building
— — — — — — — — — — — — — — — — < 0.005 < 0.005
Total — — — — — — — — — — — — — — — — 1.48 1.48
Camino Media - University Square Custom Report, 5/27/2025 64 / 85
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — — — — — — 1.45 1.45
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — — — — — — 0.01 0.01
Health
Club
— — — — — — — — — — — — — — — — 0.02 0.02
General
Office
Building
— — — — — — — — — — — — — — — — < 0.005 < 0.005
Total — — — — — — — — — — — — — — — — 1.48 1.48
Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Low Rise
— — — — — — — — — — — — — — — — 0.24 0.24
Recreati
onal
Swimmi
ng
Pool
— — — — — — — — — — — — — — — — < 0.005 < 0.005
Health
Club
— — — — — — — — — — — — — — — — < 0.005 < 0.005
General
Office
Building
— — — — — — — — — — — — — — — — < 0.005 < 0.005
Total — — — — — — — — — — — — — — — — 0.25 0.25
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Camino Media - University Square Custom Report, 5/27/2025 65 / 85
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.7.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type
Camino Media - University Square Custom Report, 5/27/2025 66 / 85
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 67 / 85
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.9.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 68 / 85
Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 69 / 85
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 70 / 85
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 71 / 85
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Camino Media - University Square Custom Report, 5/27/2025 72 / 85
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Site Preparation Site Preparation 5/1/2025 5/20/2025 6.00 17.0 — Grading Grading 5/21/2025 7/17/2025 6.00 50.0 —
Building Construction Building Construction 7/18/2025 2/25/2027 6.00 504 — Paving Paving 2/26/2027 4/6/2027 6.00 34.0 —
Architectural Coating Architectural Coating 4/7/2027 5/15/2027 6.00 34.0 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Site Preparation Rubber Tired Dozers Diesel Average 3.00 8.00 367 0.40 Camino Media - University Square Custom Report, 5/27/2025 73 / 85
Site Preparation Tractors/Loaders/Back Diesel Average 4.00 8.00 84.0 0.37 Grading Graders Diesel Average 1.00 8.00 148 0.41
Grading Excavators Diesel Average 2.00 8.00 36.0 0.38
Grading Tractors/Loaders/Back
hoes
Diesel Average 2.00 8.00 84.0 0.37
Grading Scrapers Diesel Average 2.00 8.00 423 0.48
Grading Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40 Building Construction Forklifts Diesel Average 3.00 8.00 82.0 0.20 Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 Building Construction Cranes Diesel Average 1.00 7.00 367 0.29 Building Construction Welders Diesel Average 1.00 8.00 46.0 0.45 Building Construction Tractors/Loaders/Back
hoes
Diesel Average 3.00 7.00 84.0 0.37
Paving Pavers Diesel Average 2.00 8.00 81.0 0.42
Paving Paving Equipment Diesel Average 2.00 8.00 89.0 0.36 Paving Rollers Diesel Average 2.00 8.00 36.0 0.38
Architectural Coating Air Compressors Diesel Average 1.00 6.00 37.0 0.48
5.2.2. Mitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Site Preparation Rubber Tired Dozers Diesel Average 3.00 8.00 367 0.40 Site Preparation Tractors/Loaders/Back
hoes
Diesel Average 4.00 8.00 84.0 0.37
Grading Graders Diesel Average 1.00 8.00 148 0.41
Grading Excavators Diesel Average 2.00 8.00 36.0 0.38
Grading Tractors/Loaders/Back
hoes
Diesel Average 2.00 8.00 84.0 0.37
Grading Scrapers Diesel Average 2.00 8.00 423 0.48
Grading Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40 Camino Media - University Square Custom Report, 5/27/2025 74 / 85
Building Construction Forklifts Diesel Average 3.00 8.00 82.0 0.20 Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 Building Construction Cranes Diesel Average 1.00 7.00 367 0.29 Building Construction Welders Diesel Average 1.00 8.00 46.0 0.45 Building Construction Tractors/Loaders/Back
hoes
Diesel Average 3.00 7.00 84.0 0.37
Paving Pavers Diesel Average 2.00 8.00 81.0 0.42
Paving Paving Equipment Diesel Average 2.00 8.00 89.0 0.36 Paving Rollers Diesel Average 2.00 8.00 36.0 0.38
Architectural Coating Air Compressors Diesel Average 1.00 6.00 37.0 0.48
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Site Preparation — — — —
Site Preparation Worker 17.5 17.3 LDA,LDT1,LDT2
Site Preparation Vendor — 10.6 HHDT,MHDT
Site Preparation Hauling 0.00 20.0 HHDT
Site Preparation Onsite truck — — HHDT
Grading — — — —
Grading Worker 20.0 17.3 LDA,LDT1,LDT2
Grading Vendor — 10.6 HHDT,MHDT
Grading Hauling 0.00 20.0 HHDT
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 141 17.3 LDA,LDT1,LDT2
Building Construction Vendor 21.7 10.6 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Camino Media - University Square Custom Report, 5/27/2025 75 / 85
Building Construction Onsite truck — — HHDT
Paving — — — —
Paving Worker 15.0 17.3 LDA,LDT1,LDT2
Paving Vendor — 10.6 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck — — HHDT
Architectural Coating — — — —
Architectural Coating Worker 28.1 17.3 LDA,LDT1,LDT2
Architectural Coating Vendor — 10.6 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT
5.3.2. Mitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Site Preparation — — — —
Site Preparation Worker 17.5 17.3 LDA,LDT1,LDT2
Site Preparation Vendor — 10.6 HHDT,MHDT
Site Preparation Hauling 0.00 20.0 HHDT
Site Preparation Onsite truck — — HHDT
Grading — — — —
Grading Worker 20.0 17.3 LDA,LDT1,LDT2
Grading Vendor — 10.6 HHDT,MHDT
Grading Hauling 0.00 20.0 HHDT
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 141 17.3 LDA,LDT1,LDT2
Building Construction Vendor 21.7 10.6 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Camino Media - University Square Custom Report, 5/27/2025 76 / 85
Building Construction Onsite truck — — HHDT
Paving — — — —
Paving Worker 15.0 17.3 LDA,LDT1,LDT2
Paving Vendor — 10.6 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck — — HHDT
Architectural Coating — — — —
Architectural Coating Worker 28.1 17.3 LDA,LDT1,LDT2
Architectural Coating Vendor — 10.6 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 409,982 136,661 9,000 3,000 4,352
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Site Preparation — — 25.5 0.00 —
Grading — — 150 0.00 —
Paving 0.00 0.00 0.00 0.00 1.66
Camino Media - University Square Custom Report, 5/27/2025 77 / 85
5.6.2. Construction Earthmoving Control Strategies
Non-applicable. No control strategies activated by user.
5.7. Construction Paving
Land Use Area Paved (acres) % Asphalt
Apartments Low Rise — 0%
Parking Lot 1.66 100%
Recreational Swimming Pool 0.00 0%
Health Club 0.00 0%
General Office Building 0.00 0%
5.8. Construction Electricity Consumption and Emissions Factors kWh per Y ear and Emission Factor (lb/MWh)
Y ear kWh per Y ear CO2 CH4 N2O
2026 0.00 204 0.03 < 0.005
2027 0.00 204 0.03 < 0.005
2025 0.00 204 0.03 < 0.005
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Y ear VMT/Weekday VMT/Saturday VMT/Sunday VMT/Y ear Apartments Low
Rise
1,403 1,403 1,403 512,092 13,286 13,286 13,286 4,849,547 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Recreational
Swimming Pool
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Health Club 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Camino Media - University Square Custom Report, 5/27/2025 78 / 85
0.000.000.000.000.000.000.000.00General Office
Building
5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Y ear VMT/Weekday VMT/Saturday VMT/Sunday VMT/Y ear Apartments Low
Rise
1,403 1,403 1,403 512,092 13,286 13,286 13,286 4,849,547 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Recreational
Swimming Pool
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Health Club 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
General Office
Building
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
Hearth Type Unmitigated (number)
Apartments Low Rise —
Wood Fireplaces 0
Gas Fireplaces 0
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 0
Conventional Wood Stoves 0
Catalytic Wood Stoves 0
Non-Catalytic Wood Stoves 0
Pellet Wood Stoves 0
Camino Media - University Square Custom Report, 5/27/2025 79 / 85
5.10.1.2. Mitigated
Hearth Type Unmitigated (number)
Apartments Low Rise —
Wood Fireplaces 0
Gas Fireplaces 0
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 0
Conventional Wood Stoves 0
Catalytic Wood Stoves 0
Non-Catalytic Wood Stoves 0
Pellet Wood Stoves 0
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq
ft)
Residential Exterior Area Coated (sq
ft)
Non-Residential Interior Area Coated
(sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
409981.5 136,661 9,000 3,000 4,352
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 180
5.10.4. Landscape Equipment - Mitigated
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 180
Camino Media - University Square Custom Report, 5/27/2025 80 / 85
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Apartments Low Rise 938,745 204 0.0330 0.0040 5,281,050 Parking Lot 63,534 204 0.0330 0.0040 0.00
Recreational Swimming Pool 0.00 204 0.0330 0.0040 0.00
Health Club 53,389 204 0.0330 0.0040 184,375
General Office Building 35,170 204 0.0330 0.0040 59,909
5.11.2. Mitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Apartments Low Rise 102,165 204 0.0330 0.0040 5,281,050 Parking Lot 63,534 204 0.0330 0.0040 0.00
Recreational Swimming Pool 0.00 204 0.0330 0.0040 0.00
Health Club 53,389 204 0.0330 0.0040 184,375
General Office Building 35,170 204 0.0330 0.0040 59,909
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Apartments Low Rise 7,744,639 2,413,872
Parking Lot 0.00 0.00
Recreational Swimming Pool 100,543 0.00
Health Club 266,144 0.00
Camino Media - University Square Custom Report, 5/27/2025 81 / 85
General Office Building 266,601 0.00
5.12.2. Mitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Apartments Low Rise 7,744,639 2,413,872
Parking Lot 0.00 0.00
Recreational Swimming Pool 100,543 0.00
Health Club 266,144 0.00
General Office Building 266,601 0.00
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Apartments Low Rise 141 —
Parking Lot 0.00 —
Recreational Swimming Pool 9.69 —
Health Club 25.6 —
General Office Building 1.40 —
5.13.2. Mitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Apartments Low Rise 141 —
Parking Lot 0.00 —
Recreational Swimming Pool 9.69 —
Health Club 25.6 —
General Office Building 1.40 —
Camino Media - University Square Custom Report, 5/27/2025 82 / 85
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Apartments Low Rise Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Apartments Low Rise Household
refrigerators and/or
freezers
R-134a 1,430 0.12 0.60 0.00 1.00
Recreational
Swimming Pool
Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
Recreational
Swimming Pool
Stand-alone retail
refrigerators and
freezers
R-134a 1,430 0.04 1.00 0.00 1.00
Health Club Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
Health Club Stand-alone retail
refrigerators and
freezers
R-134a 1,430 0.04 1.00 0.00 1.00
General Office
Building
Household
refrigerators and/or
freezers
R-134a 1,430 0.02 0.60 0.00 1.00
General Office
Building
Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
5.14.2. Mitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Apartments Low Rise Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Apartments Low Rise Household
refrigerators and/or
freezers
R-134a 1,430 0.12 0.60 0.00 1.00
Camino Media - University Square Custom Report, 5/27/2025 83 / 85
Recreational
Swimming Pool
Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
Recreational
Swimming Pool
Stand-alone retail
refrigerators and
freezers
R-134a 1,430 0.04 1.00 0.00 1.00
Health Club Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
Health Club Stand-alone retail
refrigerators and
freezers
R-134a 1,430 0.04 1.00 0.00 1.00
General Office
Building
Household
refrigerators and/or
freezers
R-134a 1,430 0.02 0.60 0.00 1.00
General Office
Building
Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.15.2. Mitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Y ear Horsepower Load Factor
5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr) Daily Heat Input (MMBtu/day) Annual Heat Input (MMBtu/yr) Camino Media - University Square Custom Report, 5/27/2025 84 / 85
5.17. User Defined
Equipment Type Fuel Type
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
5.18.2.2. Mitigated
Camino Media - University Square Custom Report, 5/27/2025 85 / 85
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
8. User Changes to Default Data
Screen Justification
Land Use The lot acreage was updated based on site plan.
Construction: Construction Phases Construction phase length updates to accurately reflect project timelines.
Operations: Hearths No woodstoves/fireplaces
Operations: Vehicle Data Updated trip rate for residential per trip generation letter. Other land uses are only intended for residents and would not require additional trips.
Operations: Fleet Mix Updated to match SJVAPCD residential fleet mix for 2027.
Camino Media – University Square / Small Project Analysis Level Assessment Trinity Consultants B-1
APPENDIX B. HEALTH RISK ASSESSMENT MODELING FILES
(Electronic Files)