"EXHIBIT A"
FEE SCHEDULE
ICR 136.58 %
GEOTECHNICAL AND MATERIAL TESTING FOR VARIOUS PROJECTS IN
BAKERSFIELD
1. In-Place Density (ASTM D-2922)
2500 tests @ $ 0 per test
2. Maximum Density (ASTM D-1557)
275 tests @ $ 275.00 per test
3. Check Point (ASTM D-1557)
45 tests@$ 98.00 per test
I
4. In Place Density (CAL 231)
300 tests @ $ 0 per test
5. Maximum Density (CAL 216)
40 tests @ $ 295.00
6. Sand Equivalent (CAL 217)
300 tests @ $ 120.00 per test
7. Sieve Analysis (CAL 202)
600 tests@ $ 140.00 per test
8. Asphalt Content (CAL 382)
500 tests @ $ 185.00 per test
incl. in item 11
$ 75,625.00
$ 4,410.00
incl. in item 11
$ 11,800.00
$ 36,000
$ 84,000.00
$ 92,500.00
9. Concrete Cylinder (CAL 521)
150 sets @ $ 192.00 per set $ 28,800.00
Note: Assume each set consists of curing 6
cylinders & breaking an average of 4.
10. Aggregate Cleanness (CAL 227)
25 tests@ $130.00 per test $3,250.00. _
11 . Field Technician (see notes)
a. 6000 hours @ $ 125.00 per hour (ST) $ 750,000.00
b. 400 hours@ $187.00 per hour (OT) $ 74,800.00
c. 100 hours @ $ 250.00 per hour (OT) $ 25,000.00
12. Asphalt Concrete In-Place Density (CAL375)
350 tests @ $__0___per test incl. in item 11
N V 5
NV5 WEST, Inc.
_______________ 2_0_1_5_W_es_tw_in_d_D_ri_v--'e,'-S_u_it_e_9_ a_n_d_1_0.:.., _B_ak_e_rs_f_ie_ld..:..' _C_A_9_3_3_01___,_1_6_6 _1_.3_2_5_.2_6_99___,_l_www __ .N_V_5_.c_o_m
GEOTECHNICAL / MATERIAL TESTING FEE SCHEDULE
GENERAL TERMS & CONDITIONS
• Testing Samples - An hourly preparation charge will be added to all samples submitted that are not ready for testing.
• Turn-Around-Time - Standard TAT indicated in superscript. See notes regarding TAT at bottom of page 3.
RUSH: 50% surcharge. Sample prioritized over other samples in que.
PRIORITY: I 00% surcharge: Completed as fast as possible per method. • Project Setup - A $200 fee applies for setup and administration of On Call agreements and contracts less than $3,500.
• Scheduling - A minimum of 24-hour notice is required to schedule personnel (48-hour for DSNOSHPD projects). For same-day scheduling, a 50% premium applies. Same-day cancellations will incur a 2-hour charge. Cancelation after field personnel have been dispatched will be charged a 4-hour minimum charge.
• Minimum Charges - A minimum charge of 4 hours applies to inspection/testing call-out between O and 4 hours. Eight (8) hours will be charged for work performed over 4 hours up to 8 hours. Overtime charges will be rounded to the nearest half hour.
• Overtime Rates - Rates are based on an 8-hour workday between the hours of7:00 a.m. and 4:00 p.m., Monday through Friday. Work outside of these hours or in excess of 8 hours in one day or over 40 hours in one week will be charged at 1.5 times the listed rates. Work over 12 hours in one day or work on holidays will be charged at 2.0 times quoted rates. • Holidays - New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day and the following Friday, and Christmas Day. For holidays falling on Saturday or Sunday, the closest regular workday will be observed.
I. PROFESSIONAL. TECHNICAL. & SUPPORT STAF F
(Hourly ratts u11l,ss othuwis, indicattd. Charg,s ar, portal-to portal from/to NV5's lab) A. Professional Staff
Principal Engineer/Geologist/Consultant
Senior Engineer/Geologist/Consultant (PE, CEG)
Project Engineer/Geologist/Consultant
Sr. Staff Engineer/Geologist/Consultant
Staff Engineer/Geologist/Consultant
Construction Services Manager
Project Manager
Standard
$ 210
$ 195
$ 170
$ 145
$ 135
$ 180
$ 170
B. Technical Staff Prevailing Wage Standard
ICC Special Inspector I/ Soil-Asphalt-AC! Technician I $ 118 $ ICC Special Inspector II / Soil-Asphalt-A CI Technician II $ I 25 $ ICC Special Inspector III / Soil-Asphalt-AC! Technician W $ 130 $ A WS Certified Welding Inspector I $ 125 $
A WS Certified Welding Inspector U $ 130 $
Roofing/Waterproofing Inspector I $ 120 S
Roofing/Waterproofing Inspector II $ 130 $
NOT Technician I (UT/Mag PanJDye Pen.) $ 120 $
NOT Technician ll (UT/Mag PanJDye Pen.) $ 130 $
98 105
1 IO
105
110
100
110
100
110
C- Public Works/DSNOSPHD Inspection
Project Inspector / OSHPD IOR C, DSA Pl Ill
Project Inspector / OSHPD !OR B, DSA PI n
Project Inspector / OSHPD !OR A, DSA PI I
DSA Masonry / Shotcrete Inspection I
Standard
DSA Masonry / Shotcrete Inspection U
D. Sample Pickup. Delivery. Storage & Mileage
S I 15
$ 125
$ 135
$ 115
$ 125
Sample Pickup/Delivery (>25mi. r>diusdub)- plus applicable unit price Saturday Sample Pickup/Delivery (hourly, 4 hr minimum, plus mileage) Mileage / Trip Charge - Field Vehicle $0.60 / mi ($30/day min. charge) Mileage- Coring Truck
Vehicle - Field Truck
E. Diamond Coring
$ 100
$ 110
$ 120
$ 100
$ 115
Standard
$ 761hr
$ 105/hr
$ 0.60/mi
$ 0.75/mi
$ 60/day
*Min. charge= field time w/travel + I hr. mob./demob for accessible natwork only - diamond coring outside of natwork areas will be per quote.
NV5 is cu1iji,d
or approv,d by:
• Travel - Hourly travel is charged portal-to-portal for technicians.
Travel charges may be waived for special inspectors within 25 miles of our laboratory. Mileage/frip Charges charged at rates listed below. • Per Diem - Per diem will be charged at 1.1 times the Federal (GSA) rate for all out-of-town assignments unless otherwise arranged. • Project Management & Report Distribution - All assignments are under the supervision of a Registered Professional Engineer.
Engineering time of 0.1 hour per inspection day or ½-hour/week (min) will be invoiced for scheduling, management, & report review. • Outside Services / Drillers-CPT I Subcontractors - Cost plus 15%. • Prevailing Wage - Client shall notify NV5, in writing, of any requirement for payment of California Prevailing Wage or other predetermined wage condition. Client agrees to indemnify NV5 against all costs related Client's failure to notify NV5 of predetermined wage requirements.
• Sample Disposition - Unless previously arranged, all samples will be disposed of upon completion of testing. Any samples suspected of contamination held pending disposition by Client. If requested, retained samples may be archived for a specified period for an agreed monthly fee - typically $5/mo per ring/tube sample, $ I Olmo AC box, $15/mo bulk.
• Certified Payroll - A $40 per week minimum, per project processing fee for Certified Payroll will be assessed on Prevailing Wage Projects. • Escalation - Listed rates are subject to annual escalation in accordance with NV5 Bakersfield's published annual Fee Schedule. Updated Fee Schedules will be published annually and become effective January I.
Machine, Truck & I Operator
Machine, Truck & Operator & Oiler
Machine, Truck, Operator & Oiler- Full Day
Coring Bit Charge
F. Support Staff & Special Services
Laboratory Technician
Certified Payroll Admin. (0.5 hr minJwk)
Court Appearance and Depositions (4 hr min)
Clerical
Prevailing Wage
$230/hr
$340/hr
$2,700
II. MATERI
A
LSANDEQUIPMEN T
A. Equipment
I. Air Meter (Concrete) $
2. Asphalt Patch (cold patch / cutback) - per bag $
3. Calibrated Ram (Pull test) $
4. Ceiling Wire Dead-Weight Equip. $
5. Coating Thickness Gauge $
6. Concrete Slab Moisture Emission Kit / RH Probe (ea.) $
7. Floor Flatness (plus labor- 4hr min) $
8. Durometer Gauge (Shore AID) $
9. Dynamic Cone Penetrometer (Wildcat w/ 35 lb hammer) $ I 0. Generator (Portable) $
11. Ground Penetrating Radar (GPR) - (plus labor - 4 hr min) $
12. Hardness Gauge (Brinell. Rockwell) $
13. Non-Shrink High-Strength Grout (per bag) $
14. Nuclear Gauge $
15. Pachometer (Rebar) Survey Equipment $
16. Peristaltic Groundwater Sampling Pump $
17. Portable Generator $
18. Scaffold - Portable $
19. Scl:lmidt Hammer $
20. Skidmore Wilhelm, per day $
21. Torque Wrench (Large,> 100 ft-lb), per day $
22. Torque Wrench (Small), per day $
23. Ultrasonic / Mag. Particle Equipment & Consumables $ Standard
$ 195/hr
$ 295/hr
$2 ,300
$ 3.50/in
Standard
$130/hr
$80/hr
$405/hr
$72/hr
Rate
55/dy
60/bag
100/dy
168/dy
100/dy
80/ea
600/dy
60/dy
520/dy
100/dy
420/dy
120/dy
50/dy
50/dy
100/dy
210/dy
95/dy
110/dy
75/dy
225/dy
90/dy
28/dy
80/dy
NV 5
NVS WEST, INC.
CITY OF BAKERSFIELD FEE SCHEDULE
m. LAB TESTS: AGGREGATE, SOlL, & sro E
A Soils - Geotechnical
I. Anerberg Limits (LL and PL) -ASTM D43 I 8, CTM 204 8
2. Consolidation (up to 9 Load/Rebound PIS) -ASTM D2435 E
3. Collapse -ASTM D4546 8
4. additional Load Increment (Consol./Collapse) - per pt.
5. Direct Shear, remolded sample -ASTM D3080 °
6. Direct Shear, undisturbed (ring) sample -ASTM D3080 °
7. Expansion Index -ASTM D4829 8
8. Moisture & Dry Density (ring samples) A
9. Organic Content by Oven Bum-0ff -AASHTO T-267
10. pH (soil)-ASTM 04972 c
11. Resistivity-ASTM G57 c
12. Resistivity (Minimum) -CfM 643 c
13. Soil Classification -ASTM D2488 -Visual-Manual A
14. Soluble Chloride (soils)'
15. Soluble Sulfate (soils) c
16. Unconfined compression on prepared specimens
B Panicle Size Analysis
I. Sand equivalent (ASTM D24 I 9, CTM 217)'
2. Sieve #200 wash only (ASTM DI 140, CTM 202)'
3. Sieve (coarse or fine only, no wash -ASTM C 136, CTM 202) A
4. Sieve (coarse & fine w/ wash -ASTM C 136, CTM 202) A
5. Hydrometer w/ Fine Sieve(ASTM D422, CfM 203) 8
6. Hydrometer w/ Fine & Coarse Sieve(ASTM D422, CTM 203) 8 C Moisture Density Relationship
I. Max. Density-Opt. Moisrure (4 in. mold)-ASTM Dl557, D698 A
2. Max. Density-Opt. Moisture (6 io. mold)-ASTM Dl5 57, D698 A
3. Max. Density-Opt. Moist. w/ Rock Corr. -ASTM Dl 557, 04718 A
4. Maximum Density Checkpoint (4 in. mold)'
5. Caltrans Relative Compaction (Wet Density) -CTM 216 A D Aggregate. Soil & Rock
I. Abrasion Resistance by LA Rattler-ASTM Cl 31. CTM 211 °
2. Absorption, sand or gravel -ASTM C 127, C 128 8
3. California Bearing Ratio (CBR) with expansion -ASTM DI 883 c
4. Clay lumps and friable particles, per primary size-ASTM C 142 c
5. Cleanness Test -ASTM D4740. CTM 227 A
6. Crushed panicles, per primary size c
7. Durability Index ($120 per size fraclion)-CTM 229 A
8. Fial & Elongated Panicles (per bin size)-ASTM 04791 c
9. Lightweight pieces, per size fraction -ASTM C 123 c
I 0. Moisture determination (aggregate samples) A
11. Monar making properties of Sand ASTM C87 °
12. Organic impurities -ASTM C40, CTM 213 8
13. Petrographic Analysis of Gravel - ASTM C295 (single grading) 6
14. Petrographic Analysis of WC Sand -ASTM C295 (pre-graded) E
15. Potential Reactivity Test ASTM C289 Chemical Method 0
16. Potential Reactivity ASTM c:227 Monar Bar Method (3 month)• Each additional month
17. Potential Reactivity Test ASTM Cl 260 Rapid Method E
18. Potential Reactivity ASTM C 1293 Monar Bar w/ Pozz ( 12 month) E Extend Lo 24-months add /C/29J ,,quim Sp.Gra,·. 4< Um, W,igh1)
19. Potential Reactivity Test ASTM Cl5 67 Rapid-Cement Combo"
20. 'R' Value - ASTM D2844, CT 301 (Treated material by quote) 8
21. Specific gravity w/ absorption - coarse (ASTM C 127, CfM 206)8
22. Specific gravity w/ absorption - fine (ASTM Cl 28, CTM 207)8
23. Sulfate Soundness, 5 cycle test per primary size -ASTM C88 °
24. Thermal Resistivity of Soil (including I proctor curve)
25. Uncompacted Void Content of Fine Aggregate-AASHTO T304 8
26. Unit weight -ASTM C29
E Soil-Cement / CTB Tests
I. Lime Treatment: pH by Eades & Grim -ASTM D62676 8
2. Lime Treatment: Fabrication & Compaction (3)-ASTM D3551 8
3. Lime Treatment: Compressive Strength (ea)-ASTM D5102 8
4. Soil Cement -Moist.-Dens. - ASTM D558-Lab Mixed 8
5. Soil Cement -Moist.-Dens. - ASTM D558 -Field Mixed c
6. Soil Cement -Wet-Dry Durability -ASTM 0559 E
7. Soil Cement-Freeze-Thaw Durability-ASTM D560 E
8. Soil Cement -Mix, Compact & Cure Specimen -ASTM Dl632 A
9. Soil Cement -Compressive Strength - ea sample -ASTM D 1633 A I 0. Cement Treated Base (CTB), compact & cure E
11. Cement Treated Base -Compression (ea)
12. Cement Treated Base -Stability (3)
$ 225
$ 355
$ 175
$ 68
$ 310
$ 260
$ 224
$ 24
$ 235
$ 38
$ 62
$ 165
$ 48
$ 84
$ 84
$ 146
$ 120
$ 100
$ 110
$ 140
$ 224
$ 255
$ 225
$ 275
$ 330
$ 98
$ 295
$ 215
$ 60
$ 715
$ 115
$ 130
$ 165
$ 215
$ 190
$ 400
$ 35
$ 385
$ 95
$ 450
$ 850
$ 495
$ 785
$ 118
$ 625
$ 1600
$ 800
$ 760
$ 315
$ 110
$ 130
$ 365
$ 1030
$ 175
$ 72
$ 360
$ 440
$ 110
$ 410
$ 305
$ 980
$ 1145
$ 130
$ 120
$ 440
$ 109
$ 525
2 F Rip Rap/ Rock Slo e Protection / Dimensional Stone Tests I. Rock Gradation ° hourly engineering clu,rge (per quote)
2. Absorption / Apparent Specific Gravity -ASTM Cl2 7. CTM 206 ° $ 130
3. Durability -CTM 229 ° $ 275
4. PercentageWear-ASTM Cl 3J 0 $ 234
5. Compressive Strength-ASTM Cl 70 ° $ 140
6. Water Absorption & Density- ASTM C97 (3 required) 0 $ 88
7. Modulus of Rupture-ASTM C99 ° $ 152
8. Flexural Strength - ASTM C880 ° $ 172
9. Sulfate Soundness -ASTM D5240 (5 cycle) F $ 440
I 0. Sample Preparation (rnuinglcnuhing/processing - I hr min) $ 192/hr (Comp .. MOR & F/,x Str. require 5 samples ea. in wtt & dry conditions /I & .1 to rift.) (All prices are for prepared samples. C1mi11g and machining chargl!s are exll"a.) IV. LAB TESTS: CEMENT, CONCRETE, & MASONRY
A Cement
I. Grab sample (CCR Tille 24) includes I year storage
2. Compression Test -High Strength Grout 2" cube-ASTM C 109 B Concrete
$
$
78 62
I. Concrete compression: 6x 12 cylinder -ASTM C39 A $ 40
2. Concrete compression: 4x8 cylinder -ASTM C39 A $ 32
3. Concrete cylinder pickup: 6x 12 (>25mi rawus of Lab add hourly pickup ra1<) $ 20
4. Concrete cylinder pickup: 4x8 (>25mi.r•dius of Lab add hoorly pickup raie) $ 15
5. Concrete cylinder mold (w/ lid - spare) $ I 0.50
6. Concrete core compression test -ASTM C42 c $ 78
7. Concrete Core Length-CTM53 l $ 65
8. Concrete Trial Batch (inc/ud,s6 comprwion USIS) $ 880
9. Concrete Mix Design Review /uclud-, usting 4< revisions) $ 275 I 0. Concrete mix proportion revision $ 192
11. Density of concrete cylinder (unit weight) c $ 99
12. Drying shrinkage -ASTM CJ57 (set of 3, 5 ages) E $ 570
13. End preparation of cores, diamond sawing, per cul $ 23
14. Flexural beam pick-up (>25mL radius of /..ab add hourly pickup rouJ $ 4 7
15. Flexural strength, 6"x6" beam-ASTM C78 & C293 A $ 105
16. Shotcrete/Gunite core compression test (not including coring) $ 57
17. Coring of Shotcrete/Gunite panel in laboratory, each core $ 68 I 8. Shotcrete/Gunile panel pick-up (>2.Smi. rad,u., of Lab add hourly p,c/a,p rauJ $ 85
19. Shotcrete/Gunite Panel consiruction Per Quote
20. Lab trial batch, not including specimen tests - ASTM C 192 Per Quote
21. Lightweight. insulating concrete compress, 4 req. -ASTM C495 $ 88
22. Lightweight insulating concrete-unit weight (oven dry) $ 110
23. Modulus of elasticity, 4"x8" cylinder -ASTM C469 ° $ 275
24. Non-Shrink (Dry-Pack) Grout Compresion -2"x2"x2" $ 57
25. Petrographic Analysis - Hardened Concrete -ASTM C856 (p,r core) E $ 1075
26. Poisson's Ratio on 6"x 12" cylinders - ASTM C469 ° Per Quote
27. Splining tensile -ASTM C496 ° $ 205
28. Thermal Resistivity - Concrete - FTB $ I 040
C Masonry
I. Absorption - brick, 5 required -ASTM C67 ° $ 80
2. Absorption - masonry unit, 3 required -ASTM C 140 ° $ 62
3. Compression, brick, 5 required -ASTM C67 ° $ 52
4. Compression - masonry core c $ 58
5. Compression - masonry prisms 8"x 8" -ASTM Cl3 14 ° $ 182
6. Compression - masonry unit, 3 required -ASTM Cl4 0 ° $ 94 (requires absorption/unit weight tests for net area)
7. Dimensions -masonry unit, 3 required O $ 57
8. Compression test. grout specimens $ 42
9. Compression test. monar specimens $ 42
10. Diamond sawing of masonry specimens, if required (minimum) $ 30
11. Efnorescence $ 360
12. Linear shrinkage, masonry unit, set of 3 -ASTM C426 E $ 515
13. Masonry Unit Acceptance Tests -ASTM Cl 40 ° $ 645
(includes absorption, compression, dimensions, unit weight)
14. Monar Aggregate Ratio-ASTM C780 (A4)8 $ 360
15. Modulus of rupture, brick, 5 required -ASTM C67 ° $ 120
16. Moisture content - masonry unit (as received),3 req'd-ASTM CJ40 ° $ 52
17. Relative Mortar Strength - CTM 515 ° $ 465
18. Sample Pickup -Grout, Monar (per specimen) $ 31
19. Sample Pickup -Masonry Prism (per specimen) $ 83
20. Shear test on masonry core-CBC 2105A.48 $ 120
21. Tensile test on masonry block $ 465
22. Unit weight, masonry unit. 3 required -ASTM C 140 ° $ 62
23. Veneer Shear Test -ASTM C482 ° (5 required) $ 208
24. Visual Examination & Photo-Document Core-CBC 2105A.4 8 $ 52 NV 5
NVS WEST, INC.
CITY OF BAKERSFIELD FEE SCHEDULE
V. LAB TESTS: REINFORCING & STRUCTURAL STEEL
A General Testing
I. Processing mill certification (each size & heal)
2. Rockwell or Brinell Hardness, average of three readings
3. Zinc coating, each item (includes Haz Mat Fee) c
B Reinforcing Steel
I. Deformation, reinforcing steel c
2. Pre-stress, strand or wire, tensile & elongation °
3. Proof test on post-tension assembly
4. Bend Test (rebar)c
5. Tensile test (rebar), up to & including #8 c
6. Tensile test (rcbar) #9, #10, #11 °
7. Tensile test(rebar)# l4,#18 °
8. Rebar Mechanical Coupler (Tension) Test (up 10 #11 bar) 0 C Structural Steel
I. Cutting & machining charges
2. Bend rest, structural, all sizes
$25
$38
$224
$62
Per Quote
Per Quote
$68
$68
$130
$215
$224
cost+ 15%
$78
$78
$130
$70
3. Tensile test, suuctural, <¾" cross-section (cutting & machining extra)*
4. Tensile test, structural, >¾" cross-section (cutting & machining extra)*
5. Flattening test of pipe
*Tensile and yield by percent offset, add $85
D High Strength Bolts
I. DSA-Certified High Strength Bolt Set ea. (Bolt, Nut, & Washer) 0 $ 395
2. Bolts -proof load (non-DSA) 0 $ 4 7
Bolts -ultimate load O $ 68
Bolls -hardness O $ 37
3. Nuts - proof load O $ 4 7
Nuts -hardness O $ 37
4. Washers -hardness O $ 37
VI. MISCELLANEOUS CONSTRUCTION MATERIALS TESTS
I. Calibration Ce1tifica1es
2. Density of Sprayed Fireproofing
3. Roof Tile Strength
4. Roof Tile Absorption
5. Roof Cut Tests (total weight only)
6. Jobsite Trailer or Mobile Laboratory
7. Universal Testing Machine (Hourly)
8. Ground Rod Test (plus travel)
VII. ASPHALT & ASPHALTIC CONCRETE
A. Emulsions And Slurry Seals
I. Consistency test -ASTM D39 IO•
2. pH determination 8
3. Percent Residue by Evaporation ASTM D244/A
4. Reclamite Percent Residue by Evaporation ASTM D244 Mod.A
5. Solids content by evaporation and ignition extraction (slurry) A
6. Wet Track Abrasion -ASTM 039 IO (prep. not included) A B. Asphaltic Concrete, Aggregate And Mixes
I. Bulk Specific Gravity (HVEEM -3 p1. LTMD) CT308 /Tl66 A
2. Bulk Specific Gravity (SP -3 pt. w/ Air voids) T312/f 166A * Add $75 for Asphalt Rubber Binder
3. Coring of asphaltic concrete - See Section E Diamond Coring
4. Extraction, % bitumen and sieve analysis
Ignition Oven Method - T308/f30 A
Solvent Extraction Method -ASTM 02172 8
5. Extraction, % bitumen only
Ignition Oven Method -T308 A
Solvent Extraction Method -ASTM 2172 8
6. Film stripping -CTM 302 c
7. Gyratory Compaction, 6'' specimen, Lab Mix* - AASHTO T3l2 8 Per Quote
$90
$105
$85
$85
Per Quote
$235
$235
$100
$79
$105
$175
$255
$168
$236
$350
$255
$435
8. Gyratory Compaction, 6'" specimen, Plant Mix* -AASHTO T3 l 2 8 $185
$340
$175
$380
$325
* Add $110 for Asphalt Rubber Binder
9. Hamburg Wheel Track-AASHTO T324 13
IO. Ignition Oven 1linder C01Tection Factor-T308 8
11. Ignition Oven Aggregate Co1Tection Factor -T308/f3o"
12. Marshall -Preparation & Compaction•
13. Marshall - Stability and flow (core)-ASTM 06927 A
14. Marshall - Stability and flow (bulk) -ASTM D6927 8
15. Marshall - Specific Gravity-ASTM 02926 A
16. Theoretical Maximum Specific Gravity (RICE)-D-2041, CT 309 A $1,565
$685
$350
$220
$137
$345
$242
$210
3 17. Moisture comem-ASTM D-1461 A
18. Recovery of Extracted Asphalt (extraction only) - ASTM 05404 ° I 9. Recovery of rnbber from ARHM extraction °
20. Specific gravity of core - ASTM 02726 A
21. HVEEM Stabilome1er test on premixed sample -CTM 366 A Stabilometer test and mixing of sample 11
22. Surface Abrasion - CTM 360 c
$120
$265
$330
$63
$195
$420
$550
23. Resistance 10 Moisture lnduced Damage -T-283 °
24. Resistance to Moisture Tnduced Damage -CT 371 °
$1,945
$2,785
NOTE: Where prices are listed for mix proponions, the necessary specific gravity tests, compaction and sieve analyses are included; however, aggregate and asphalt qualifica1ion test5 are not.
A.e.c.o.E Standard Turn-Around-Times: (where applicable TAT indicated in superscript following method):
A -3 working days; B - 5 working days; C -7 working days; D - 10 working days; E -> 10 working days
Standard TAT indicates anticipated testing time under typical conditions and is subject to availability and precedence. RUSH TAT prioritizes testing over other samples. PRIORITY TAT dedicates technician 10 complete test as quickly as possible per the method specifications -hourly charges will apply for weekend or ho! iday work.
ADDITIONAL TESTS: NV5 performs a broad spectrnm of field and laboratory testing. This Fee Schedule lists only the most common tests performed. For information regarding additional testing services, please contact our laboratory.
Aa.
MSHTOR18
.ACCREDITED I.ASOAATORI'