1 | P a g e

Multi-Modal Transportation & Traffic Safety Committee Bi-Monthly Report February 2026

Projects
The City of Bakersfield Public Works Department is dedicated to proactively identifying, planning, and implementing effective Traffic Calming measures across the City. These initiatives are designed with the goal of enhancing road safety for all users, particularly pedestrians and cyclists, while promoting a safer, more inclusive environment for various modes of transportation. By strategically targeting areas with high traffic volumes and pedestrian activity, the department aims to reduce accidents, improve the overall safety of our roadways, and encourage sustainable transportation options.

The following is a comprehensive list of both current and completed projects, each carefully developed with a focus on multi-modal transportation, traffic safety, and community well-being.

These projects reflect the City’s commitment to creating a balanced and accessible transportation system that meets the needs of all residents, whether they’re traveling by foot, bicycle, car, or public transit. Through these efforts, the Public Works Department strives to foster a safer, more connected, and more resilient community.

*Grant Funded
Complete Streets
Project Execution Status
Complete Streets along Stine
Rd: Ming Ave to Wilson Rd
APD (Design)
Streets (Install) Construction Complete
Complete Streets along Baker
St: Monterey St to 21st St*
APD (Design)
Streets (Install) 90% Design reached
Corridor Enhancements:

Chester Ave
Design Engineering (Design)
Contractor (Install)
Design Complete. Advertisement pending
additional funding.

Corridor Enhancements: 18th
St and 19th St
Design Engineering (Design)
Contractor (Install)
Project Awarded to Cen-Cal Construction. Set
to begin Q4 FY25/26
Corridor Enhancements: MLK
Blvd*
Consultant (Design)
Contractor (Install) Design at 75%.

Corridor Enhancements:

Monitor St
Consultant (Design)
Contractor (Install) Phase 1 at 100% Design. Con. Set for FY27/28 Corridor Enhancements: H St* Consultant (Design)
Contractor (Install)
Design at 100%. Finalizing Public Comments
and CTC Extension before advertising

2 | P a g e

Corridor Enhancements: Niles
St & Monterey St
Consultant (Design)
Contractor (Install)
Design at 65%. Phase 1 Construction funding
request for FY26/27.

Traffic Calming and Pedestrian Improvements
Project Execution Status
Traffic Calming - Oleander Ave: E California
Ave to Brundage Ln
APD (Design)
Streets (Install) Sent to Streets for Installation
Pedestrian Improvements - Wible Rd:

Berkshire Rd to Panama Ln
APD (Design)
Contractor (Install)
Design at 100%. Construction
funding request for FY26/27.

Rapid Rectangular Flashing Beacon - Truxtun
Ave at Pine St*
APD (Design)
Contractor (Install)
Awarded. Construction to begin Q4 FY
25/26
Rapid Rectangular Flashing Beacon - Chester
Ave at 22nd St*
APD (Design)
Contractor (Install) Design Complete. Ready to Advertise Pedestrian Improvements: Q St and Espee St Design Engineering (Design) Contractor (Install) Phase 1 of Construction Complete.

Speed Hump – Christmas Tree Ln APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Gasoline Alley Dr APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Sundale Ave APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Jewett Ave APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – O St APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Real Rd APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Beech St APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Custer Ave APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – District Blvd APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Sandra Dr APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Flashing Beacons: Norris Rd & Stiern Middle
School
APD (Design)
Contractor (Install) Construction complete.

Garces Memorial Circle Enhancement Consultant (Design)
Contractor (Install) Construction Complete
Flashing Beacon: Veterans Elem, Warren Jr
High*
APD (Design)
Contractor (Install) Construction Complete
Flashing Beacon: Calloway Dr (Norris),
Monitor St*
APD (Design)
Contractor (Install) Construction Complete

Speed Hump – Las Entradas
APD (Design)
Streets (Install)
Construction Complete

Flashing Beacon: Golden Valley High School APD (Design) Contractor (Install)
Construction Complete

Radar Feedback Signs: Various Locations* APD (Design)
Contractor (Install) Construction Complete
Reflective Signal Backplates: Various
Locations*
APD (Design)
Contractor (Install) Construction Complete
Rectangular Rapid Flashing Beacon: Heritage
Park/Mt Vernon Ave
APD (Design)
Contractor (Install) Construction Complete
3 | P a g e

Traffic Calming Demo - Beale Ave: Niles St
and Monterey St
APD (Design)
Contractor (Install) Construction Complete
Speed Hump – Marella Way @ Stockdale
Christian School
APD (Design)
Streets (Install) Construction Complete
Speed Hump – Sandra Dr and Laurel Dr APD (Design)
Streets (Install) Construction Complete
Speed Hump – Summertree Ln and Canter
Way
APD (Design)
Streets (Install) Construction Complete
Speed Hump – El Potrero Ln and Mesa
Grande St
APD (Design)
Streets (Install) Construction Complete
Speed Hump – Dennen St APD (Design)
Streets (Install) Construction Complete
Speed Hump – Abbott Dr APD (Design)
Streets (Install) Construction Complete

Bike Trails
Project Execution Status
Stonecreek Loop: Class IV Cycle Track APD (Design)
Contractor (Install) Design at 100%. Advertising in Feb 2026 Kentucky St Urban Greening - Beale Ave to Baker
St, Canal to Mt Vernon Ave*
APD (Design)
Contractor (Install)
60% Design. Coordinating with County of
Kern
Beach Park Bridge Consultant (Design)
Environmental permitting and review.

Concept selected. Additional Design Funding
requested for FY26/27
Multi-Use Path: Friant-Kern Canal* Consultant (Design)
Contractor (Install) Under Construction.

Bike Lane: Old County Dump Rd* APD (Design)
Streets (Install) Construction Complete
Multi-Use Path: Stockdale Ranch Consultant (Design)
Contractor (Install) Construction Complete

Strategy
Public Works is dedicated to fostering continuous improvement across the City by proactively identifying and implementing opportunities that enhance the quality of life for residents. In addition to carefully evaluating and responding to public requests, the department places a strong focus on critical areas such as prioritizing safety and accessibility around schools, expanding and enhancing multi-modal infrastructure, and revitalizing the City’s historic corridors. A key component of this effort is the ongoing transformation of the Downtown core and Old Town Kern, which serve as a vibrant hub for commerce, culture, and community. By focusing on these strategic initiatives, Public Works aims to build a more sustainable, equitable, and future-ready City for all.

Funding
Safe Streets & Roads 4 All (SS4A): The Safe Streets and Roads for All Program is a U.S.

Department of Transportation initiative that provides funding to local governments and regional 4 | P a g e

entities for planning and implantation projects focused on reducing crashes and improving road safety. The program aims to support efforts on sustainable transportation solutions, particularly for vulnerable road users like pedestrians and cyclists.
 City of Bakersfield Comprehensive Safety Action Plan
Transformative Climate Communities (TCC): The Transformative Climate Communities (TCC) program is a California initiative that provides funding to disadvantaged communities for projects that reduce greenhouse gas emissions, improve public health, and enhance local economic opportunities. It aims to support community-driven climate resilience efforts through integrated strategies that address both environmental and social equity challenges.  Complete Streets Improvements: Dr. Martin Luther King Jr. Blvd Community Project Funding Grant (CPF): The Community Project Funding (CPF) program allocates federal funds to support local initiatives that address specific community needs, such as affordable housing, infrastructure improvements, and economic development. These funds are directed toward projects that benefit low- and moderate-income communities, helping to enhance living conditions and promote sustainable growth.
 Complete Streets Improvements: Dr. Martin Luther King Jr. Blvd  Monitor St Active Transportation Improvements – Phase I Active Transportation Program (ATP): The Active Transportation Program (ATP) is a California initiative that provides funding for projects that promote walking, biking, and other forms of active transportation. It focuses on improving safety, mobility, and access, particularly for disadvantaged communities, while encouraging healthier and more sustainable transportation options.  ‘H’ Street Corridor Improvements (Cycle 6 - Funded)
 Monitor St Active Transportation Improvements Project (Cycle 7 – Unfunded) Congestion Mitigation and Air Quality (CMAQ): The Congestion Mitigation and Air Quality (CMAQ) program is a federal initiative that provides funding to state and local governments for projects aimed at reducing traffic congestion and improving air quality. It supports efforts to enhance transportation systems, promote clean vehicle technologies, and encourage alternatives to driving, such as public transit and non-motorized transportation.  ‘H’ Street Safety Improvements (FY 25/26)
 18th & 19th Street Improvements (FY 25/26)
 Monitor Street Active Transportation Improvements – Phase I (FY 27/28) Transportation Development Act (TDA-3): The Transportation Development Act (TDA-3) is a California funding program that provides financial support for public transportation and bicycle/pedestrian projects through a portion of the state's sales tax revenue. TDA-3 specifically allocates funds to support transit services, including those that serve rural and smaller communities, promoting accessibility and sustainable transportation options.  Rapid Rectangular Flashing Beacons on Truxtun Avenue at Pine Street (FY 24/25)  Rapid Rectangular Flashing Beacons on Chester Avenue at 22nd Street (FY 24/25) 5 | P a g e

 Pedestrian Improvements along Potomac at UPRR Crossing (FY 26/27 Co-Applicant with Kern County)