Cities Index.
Amendment No. 1(1).pdf

Bakersfield City Council
March 25, 2026

Document
Amendment No. 1(1).pdf
Meeting
March 25, 2026
Body
Bakersfield City Council
Pages
4
Original file
6.3 MB
Text extracted from the city's file for reading and search. Open the original on pub-bakersfield.escribemeetings.com. That file is the official record.

AMENDMENT TO AGREEMENT
M:\Advanced Project Delivery\Projects\FY 2023-2024\P4K307 - 24th Street Pedestrian Bridge\Consultants\Parsons\New folder\Amnd No 1 to Agrmt No 2023-263.doc
Updated – August 2025
-- Page 1 of 3 Pages --
AGREEMENT NO. __________________

AMENDMENT NO. ONE TO
AGREEMENT NO. _2023-263_

This AMENDMENT NO. 1 TO AGREEMENT NO. 2023-263 _ is made and entered into on ________________, by and between the CITY OF BAKERSFIELD, a municipal corporation (referred to herein as “CITY”), and PARSONS TRANSPORTATION GROUP, INC. an Illinois Corporation authorized to do business in California (referred to herein as “DESIGN CONSULTANT”).

R E C I T A L S
WHEREAS, on November 08, 2023, CITY an d DESIGN CONSULTANT entered into Agreement No. 2023-263 in the amount of One Million Dollars and Zero Cents ($1,000,000.00) wherein DESIGN CONSULTANT agreed to provide design services for the 24th Street and Kern River Multi-Use Crossing Project; and

WHEREAS, CITY and DESIGN CONSULTANT de sire to enter into Amendment No. 1 to expand the scope of work, an d increase Compensation in the amount of One Million, Two-Hundred and Fifty Thousand Dollars and Zero Cents ($1,250,000.00), for a total compensation of Two Million, Two-Hundred and Fifty Dollars and Zero Cents ($2,250,000.00).

NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and DESIGN CONSULTANT mutually agree as follows:

1. Section 1 of Agreement No. 2023-263 entitled “Scope of Work” is hereby amended to read as follows:

1. SCOPE OF WORK. In exchange for the Compensation (defined below), DESIGN CONSULTANT must competent ly and thoroughly design and engineer the Project as more specif ically described in the Request, attached as Exhibit A and incorporated herein by reference, in DESIGN CONSULTANT's scope of work, attached hereto as Exhibit B and incorporated herein by reference, and in DESIGN CONSULTANT’S additional scope of work, attached hereto as Exhibit D and incorporated herein by this reference (collectively, the project description in the Request, DESIGN CONSULTANT's scope of work, and DESIGN CONSULTANT’S additional sc ope of work are referred to as "Scope of Work"). DESIGN CONSULTANT's services shall include all the

AMENDMENT TO AGREEMENT
M:\Advanced Project Delivery\Projects\FY 2023-2024\P4K307 - 24th Street Pedestrian Bridge\Consultants\Parsons\New folder\Amnd No 1 to Agrmt No 2023-263.doc
Updated – August 2025
-- Page 3 of 3 Pages --

APPROVED AS TO CONTENT:

PUBLIC WORKS DEPARTMENT

By:____________________________
Zachary Meyer
Public Works Director

APPROVED AS TO FORM:

VIRGINIA GENNARO
City Attorney

B y :

ASHLEY ZAMBRANO
Deputy District Attorney

Insurance: __________

COUNTERSIGNED:

B y :

RANDY MCKEEGAN
Finance Director

Attachments: Exhibits A, B, C, and D

2 This Amendment 1 for Beach Park Multi-Use Path Over Kern River Project (Project) formerly referred to as the 24th St Multi-Use Path Over Kern River Project. proposes to construct a bridge over the Kern River connecting to the adjacent cul-de-sacs at Riverside Dr, Oak St, and the Kern River Parkway at Beach Park. To date the following items have been accomplished:
- Developed 3 alignment alternatives for north of 24th St and 1 alignment alternative for south of 24th St.
- Prepared 4 rounds of architectural concepts that included a variety of bridge alternatives.
- Prepared 15% level structural plans for 5 structural alternatives. - Completed the draft environmental document and technical studies including:
o Air Quality Emission/Greenhouse Gas, and Energy Consumption Calculations o Biological Resources Study Report including Jurisdictional Delineation Report o Cultural Resources Assessment Report
o Paleontological Identification Report/Paleontological Evaluation Report o Phase I Initial Site Assessment
o Location Hydraulic Study Report
o Noise Measurement Data
This amendment proposes the additional scope:
- Additional architectural concepts. Previously 2 alternatives had been assumed. To date 4 rounds have been done, with one more included in this amendment that also includes an updated 15% structural concept.
- Additional environmental. Previously it was assumed that the limits of the study would be north of the bridge and no southern alternative was included. During the alternative development the southern alternative was identified and is now the preferred alternative. This included additional analysis area. As part of this scope of work, the draft environmental document will be updated including additional architectural details and an update to the location hydraulic study. This scope includes evaluation of
- Preparation of a 30% PS&E which will include:
o Type Selection Report
o Structural and Civil Plans
o Geotechnical Analysis
o Field Survey
o Cost Estimate
Task 1. Additional Project Management
Parsons shall assist in managing and directing City and City-consultant personnel assigned in project management, contract management, project controls, administrative support and construction management. Our services will cover all aspects of the project from project

SCOPE OF SERVICES

EXH D.

3 initiation through construction support and commissioning. Reporting of project scope, schedule, and cost shall be performed routinely and as requested for various audiences.

Parsons shall work closely with the City of Bakersfield, federal agencies and its agents, the County of Kern, utility companies, various local agencies, resource agencies, and other stakeholders to assist in developing these projects.

Anticipated activities include, but are not limited to:
• Provide project management direction an d coordination to the project team. • Develop and sustain an integrated team relat ionship with the City of Bakersfield Public Works staff.
• Perform project management activities, colla borative practices, and problem solving. • Support and participate in interagency coordina tion and public outreach. As necessary we will prepare presentation materials, conduct presentations, as requested, and document the results.
• Coordinate City of Bakersfield projects and document reviews with other project stakeholders such as County of Kern, cities, utility companies, other local agencies, and resource agencies.
• Foster and maintain relationships with state, federal and local governments, and resource agencies.
• Maintain and report scope, cost, and schedule.
• Assure quality, efficient, and timely completion of all project components.

Assumptions:
 8 month environmental delivery.

Deliverables:
 Project Management
 Schedule
 Deliverables Status Matrix and Tracking
 Progress Report
Task 2. Additional Project Development Team and Stakeholder Coordination Parsons will form a Project Development Team (PDT) amongst various parties, based on its’ history of working on Central Valley Projects and partnerships with applicable agencies and stakeholders for the Kern River. Our knowledge of Army Corps, Water Resource Agencies and Local Water Agency units, including but not limited to, Local Assistance, Encroachment Permit, Right-of-Way, and Traffic will be utilized for project advancement through the environmental phase. Effective strategies for project advancement will include early and frequent coordination with reviewers and agencies, maintaining effective relationships, and providing timely responses to comments and stakeholder concerns. This process will include frequent, scheduled discussions and provide an effective feedback loop ensuring a level of trust from the PDT. The project schedule will be tracked and monitored to ensure

4 key milestones and deliverables are completed. Finally, a central filing system will be used to ensure project consistency with Agency auditing requirements.

This task includes coordination with the US Army Corps, California Department of Fish and Wildlife, and the Regional Water Quality Control Board to coordinate preferred project alternative and coordinate any feedback into the 30% PS&E. 8 Meetings are assumed
Assumptions:
 City of Bakersfield and stakeholders will attend PDT meetings as scheduled.

Deliverables:
 Meeting Minutes

Task 3. Environmental Approval
The following items are included to obtain environmental approval:

1. Additional Environmental Document
The Project will require preparation of an Initial Study (IS) in accordance with CEQA (Public Resources Code Section 2100 et seq.) and the State CEQA Guidelines (Title 14, California Code of Regulations, Section 15000 et seq.). If the Initial Study determines that there will be no significant direct or indirect impact on the environment, a Negative Declaration (ND) will be prepared. If the IS determines that the proposed action, with the incorporation of identified mitigation measures, will not have a significant effect on the environment, a Mitigated Negative Declaration (MND) will be prepared. An Environmental Assessment (EA) will be prepared for NEPA.

This task includes expanding the environmental footprint to include the area south of 24 th
St. The environmental document will be updated to include this additional area and technical studies such as the Location Hydraulic Study to update for the revised pier configuration and aesthetics to finalize the visual aspects of the proposed bridge. Following completion of the Draft Environmental Document, consultant will address up to 2 rounds of comments. If requested Parsons will lead a public hearing at a committee or City council meeting. Following the circulation of the environmental document, consultant will address comments on up to two submittals to obtain approval of the Final Environmental Document.

Assumptions
 Resource agency permits will be obtained during the 65% and are not included at this time.
 Public scoping workshops will not be needed. If an open forum public hearing is required by the environmental document during the public hear it will include an informal workshop held at a City provided facility.

Deliverables:
 Update Draft Environmental Document (2 Submittals)

5  Final Environmental Document (2 Submittals)
 Public Meeting/Public Hearing (1 Meeting)
 Resource Agency Permit Coordination
Task 5 30% PS&E
This task includes tasks to support the 30% PS&E.

1. Survey
Parsons will obtain field survey along the proposed alignment to tie into existing conditions. aerial topography to use to support the design.

Deliverables:
 Field Survey

2. Type Selection
This task includes preparing a Type Selection Report that includes evaluating structural alternatives for the preferred southern alignment, performing structural calculations, seismic calculations, evaluating foundation alternatives, developing a cost estimate, and preparing the associated plans listed below.
- General plan and elev
- General notes
- Typical sections
- Foundation plan / pile layout
- Typical pier plan, elevati ons, sections (1-2 sheets) - Abutment 1
- Abutment 2
- Early details / architectural features
- Construction sequence
To support the foundation design and the following geotechnical analsysi will be included as part of a Preliminary Foundation Report that will be attached to the Type Selection Report:

The available geotechnical information will be used to characterize subsurface soils and conditions and create idealized soil profiles for design purposes. Consultant will assess the subsurface soil conditions surrounding the Kern River for the purposes of foundation design for the proposed bridge and any associated retaining walls. The following analyses are anticipated to be performed for the project; • Evaluation of seismicity and estimation of Peak Ground Acceleration based on the Caltrans design criteria and provide a recommended ARS curve for bridge design. • Liquefaction, seismic settlement and lateral spreading evaluation.

6 • Foundation analysis for bridge and retaining walls. • Assessment of global slope stability and settlement potential of site soils for new embankment fill.
• Evaluation of soil corrosivity conditions and recommendations for mitigation measures.
• Development of earthwork and construction specification recommendations for proposed improvements.

The Type Selectin Report will also included a preliminary scour analysis to support the bridge design that includes analysis of long term and local scour.

Deliverables:
 Type Selection Report

3. 30% Plans
Parsons will prepare preliminary engineering plans at a 30% level plans The following is included in the plan submittal:

Plans
Title Sheet
The tile sheet will show the vicinity map and summarize sheets included in set.

Typical Cross Sections
Typical cross sections will include widths, slopes, and other geometric information including preliminary structural section recommendations.

Improvement Plans
Will include horizontal and vertical information on a sheet cut with the bottom half as plan view and the top view is profile. Plan view will identify widths, alignments information, and geometric features such as walls, bridges, curb, dike, sidewalk, bike path, roadway reconstruction, existing utilities. Based on the preliminary engineering it is assumed that there are not utilities anticipated with this project.

Grading Plans
Consultant will prepare grading plans for the proposed project.

Storm Drain Plans
Plans for storm drains and anticipated water quality improvements will be prepared.

Signing and Stripping Plans
Plans will identify proposed signage and stripping on the trail. Wayfinding signage is assumed not needed.

Lighting Plans
Plans will identify proposed lighting on the bridge and along the trail.

Landscape Concept Plan

7 Plans will identify proposed landscape features. Irrigation is not included in this submittal and would be included with the 60% submittal.

Reports
Preliminary Geotechnical Design Report
Parsons will prepare a geotechnical design report that includes summary of available relevant geotechnical information, evaluation of geologic and geotechnical hazards anticipated to affect design or construction of the proposed improvements, preliminary seismic recommendations in accordance with SDC 2.0, evaluation of foundation alternatives for the bridge and preliminary foundation capacity evaluations, anticipated fill settlement periods, preliminary construction considerations, preliminary structural section recommendations, and a recommendation for the geotechnical investigation to be performed during final design.

Estimate
Cost Estimate
Parsons will prepare construction cost estimate utilizing available bid data and the likely means and methods for construction.

Assumptions:
 Sheet cuts will be 1”=20’
 Staging plans are assumed not needed.
 Specifications to be included in 60% submittal.

Deliverables:
 Plans
 Estimate

Sensitive#
Beach Park and Kern River Multi-Use Crossing - Fee Proposal

TOTAL DIRECT

LABOR LABOR

HOURS COSTS
Task Description
1 Project Management 258.00 $32,930.00
2 Project Development Team and Stakeholder Coordination 132.00 $29,380.00 3 Environmental Approval 1390.00 $232,195.00
5 30% PS&E 5079.00 $849,490.00

TOTAL LABOR HOURS AND DIRECT LABOR COSTS
TOTAL LABOR HOURS 6859.00
TOTAL DIRECT LABOR COSTS $1,143,995.00
Notes:

Other Direct Costs
Total ODC's
Mileage $4,805.00
Auto Rental $0.00
Printing $0.00
Per Diem $0.00
Postage/Delivery $0.00
Lodging $3,000.00
Equipment Rental $0.00
CEQA/County Clerk Filing $3,200.00
$11,005.00
Subconsultants
Company Total Subs
Lee Andrews Group $25,000.00
DPSI $20,000.00
EMI $50,000.00
$0.00
$95,000.00
$1,250,000.00Total Estimated Cost
Description
Total Other Direct Costs
Public Outreach
Aerial Topography
Geotechnical

LABOR HOURS AND COSTS

SUMMARY
Total Subconsultants

Page 1 of 4 ends

EXH. D Cont.

Sensitive#
Beach Park and Kern River Multi-Use Crossing - Fee Proposal

TOTAL DIRECT

PROGRAM DIRECTOR DISCPLINE LEAD PROJECT

ENGINEER III

PROJECT

ENGINEER II

PROJECT

ENGINEER I CAD TECHNICIAN OFFICE MANAGER LABOR LABOR
$305.00 $275.00 $210.00 $160.00 $120.00 $100.00 $85.00 HOURS COSTS 1 Project Management 0.00 $0.00
Project Management 50 208 258.00 $32,930.00
2 Project Development Team and Stakeholder Coordination 0.00 $0.00 Meetings 18 12 12 42.00 $10,230.00
Coordination 20 30 40 90.00 $19,150.00

TOTAL LABOR HOURS AND DIRECT LABOR COSTS
TOTAL LABOR HOURS 88.00 42.00 0.00 0.00 52.00 0.00 208.00 390.00 TOTAL DIRECT LABOR COSTS $26,840.00 $11,550.00 $0.00 $0.00 $6,240.00 $0.00 $17,680.00 $62,310.00 Notes:

OTHER DIRECT COSTS UNIT TOTAL ODC's
Mileage LS $5,000.00
Printing LS $0.00
Lodging LS $3,000.00
Per Diem LS $0.00
Postage/Delivery LS $0.00
$8,000.00

SUBCONSULTANT COSTS TOTAL SUB COSTS
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$70,310.00
Subconsultants

TOTAL SUBCONSULTANT COSTS
Task 1 and 2 - TOTAL ESTIMATED COST

LABOR HOURS AND COSTS
TASK NO. 1 AND 2
Other Direct Costs

TOTAL OTHER DIRECT COSTS

Page 2 of 4 ends

Sensitive#
Beach Park and Kern River Multi-Use Crossing - Fee Proposal

TOTAL DIRECT

PROGRAM

DIRECTOR

ENVIRONMENTAL

MANAGER
SENIOR

ENVIRONMENTAL

SCIENTIST

ASSOCIATE

ENVIRONMENTAL

SCIENTIST

ASSISTANT

ENVIRONMENTAL

SCIENTIST

LABOR LABOR
$305.00 $275.00 $180.00 $130.00 $100.00 HOURS COSTS
3 Environmental Approval 0.00 0.00 0.00 0.00 0.00 0.00 $0.00

3.1 Environmental Document 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 CEQA Draft ED For Public Circulation 10.00 50.00 100.00 120.00 200.00 480.00 $70,400.00 NEPA Draft ED 4.00 10.00 30.00 30.00 30.00 104.00 $16,270.00 Permit Coordination/ECRs 40.00 100.00 150.00 0.00 40.00 330.00 $70,700.00 Public Hearing/Public Outreach 12.00 6.00 8.00 6.00 0.00 32.00 $7,530.00 CEQA Final ED 5.00 40.00 80.00 90.00 120.00 335.00 $50,625.00 NEPA Final ED 4.00 10.00 25.00 40.00 30.00 109.00 $16,670.00

TOTAL LABOR HOURS AND DIRECT LABOR COSTS
TOTAL LABOR HOURS 75.00 216.00 393.00 286.00 420.00 1390.00 TOTAL DIRECT LABOR COSTS $22,875.00 $59,400.00 $70,740.00 $37,180.00 $42,000.00 $232,195.00 $232,195.00
Notes:

OTHER DIRECT COSTS UNIT TOTAL ODC's
Mileage LS $1,000.00
Printing LS $0.00
Lodging LS $0.00
Per Diem LS $0.00
Postage/Delivery LS $0.00
Equipment Rental LS $0.00
CEQA/County Clerk Filing Fees LS $3,200.00
$4,200.00

SUBCONSULTANT COSTS TOTAL SUB COSTS
Lee Andrews Group Public Hearing Support $25,000.00
$0.00
$0.00
$0.00
$0.00
$25,000.00
$261,395.00
Subconsultants

TOTAL SUBCONSULTANT COSTS
Task 3 - TOTAL ESTIMATED COST

LABOR HOURS AND COSTS
TASK NO. 3

TOTAL LABOR COSTS
Other Direct Costs

TOTAL OTHER DIRECT COSTS

Page 3 of 4 ends

Sensitive#
Beach Park and Kern River Multi-Use Crossing - Fee Proposal

TOTAL DIRECT

PROGRAM

DIRECTOR DISCPLINE LEAD PROJECT

ENGINEER III

PROJECT

ENGINEER II

PROJECT

ENGINEER I CAD TECHNICIAN CLERICAL LABOR LABOR
$305.00 $275.00 $210.00 $160.00 $120.00 $100.00 $70.00 HOURS COSTS 5 30% PS&E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00

5.1 Survey 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Survey 1.00 2.00 2.00 6.00 6.00 40.00 0.00 57.00 $6,955.00

5.2 Type Selection 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Structural Calculations 20.00 40.00 600.00 500.00 500.00 80.00 0.00 1740.00 $291,100.00 Seismic Analysis 10.00 15.00 165.00 400.00 0.00 0.00 0.00 590.00 $105,825.00 Structural Plans 15.00 30.00 250.00 300.00 200.00 300.00 0.00 1095.00 $167,325.00 Structure Estimate 5.00 10.00 50.00 70.00 0.00 0.00 0.00 135.00 $25,975.00 Scour Analysis 4.00 8.00 20.00 100.00 160.00 0.00 0.00 292.00 $42,820.00 Preliminary Foundation Report 4.00 12.00 40.00 0.00 0.00 0.00 0.00 56.00 $12,920.00 Type Selection Report 6.00 40.00 50.00 100.00 0.00 45.00 0.00 241.00 $43,830.00

4.3 30% PS&E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Title Sheet (1 Sheet) 1.00 0.00 3.00 4.00 0.00 5.00 0.00 13.00 $2,075.00 Typical Cross Sections (1 Sheet) 2.00 0.00 4.00 0.00 10.00 0.00 0.00 16.00 $2,650.00 Improvement Plans (3 Sheets) 6.00 0.00 12.00 20.00 16.00 0.00 0.00 54.00 $9,470.00 Grading Plans (3 Sheets) 2.00 10.00 40.00 100.00 50.00 0.00 0.00 202.00 $33,760.00 Storm Drain Plans (3 Sheets) 6.00 30.00 0.00 14.00 0.00 0.00 0.00 50.00 $12,320.00 Signing and Stripping Plans (3 Sheets) 6.00 30.00 0.00 40.00 0.00 0.00 0.00 76.00 $16,480.00 Lighting Plans (3 Sheets) 6.00 30.00 0.00 50.00 0.00 100.00 0.00 186.00 $28,080.00 Landscape Concept Plans (3 Sheets) 10.00 40.00 0.00 50.00 100.00 0.00 0.00 200.00 $34,050.00 Cost Estimate 6.00 15.00 10.00 15.00 20.00 10.00 0.00 76.00 $13,855.00

TOTAL LABOR HOURS AND DIRECT LABOR COSTS
TOTAL LABOR HOURS 110.00 312.00 1246.00 1769.00 1062.00 580.00 0.00 5079.00 TOTAL DIRECT LABOR COSTS $33,550.00 $85,800.00 $261,660.00 $283,040.00 $127,440.00 $58,000.00 $0.00 $849,490.00 Notes:

OTHER DIRECT COSTS UNIT TOTAL ODC's
Mileage LS $0.00
Auto Rental LS $0.00
Printing LS $0.00
Lodging LS $0.00
Per Diem LS $0.00
Postage/Delivery LS $0.00
$0.00

SUBCONSULTANT COSTS TOTAL SUB COSTS
DPSI Field Survey LS $20,000.00
EMI Preliminary Geotechnical Report LS $50,000.00
$0.00
$0.00
$70,000.00
$919,490.00
Subconsultants

TOTAL SUBCONSULTANT COSTS
Task 4 - TOTAL ESTIMATED COST

LABOR HOURS AND COSTS
TASK NO. 5
Other Direct Costs

TOTAL OTHER DIRECT COSTS

Page 4 of 4 ends