Contract Change Order No. 1(1).pdf

Bakersfield City Council
March 25, 2026

Document
Contract Change Order No. 1(1).pdf
Meeting
March 25, 2026
Body
Bakersfield City Council
Pages
1
Original file
540 KB
Text extracted from the city's file for reading and search. Open the original on pub-bakersfield.escribemeetings.com. That file is the official record.

COPY DISTRIBUTION:

ORIGINAL-CITY CLERK, WHITE-CONTRACTOR, BLUE-CONSTRUCTION, GREEN-CONTRACTOR'S INFO, YELLOW-CALTRANS, PINK ENGR., GOLD-PURCHASING

CITY OF BAKERSFIELD

PUBLIC WORKS DEPARTMENT

CONTRACT NO. P. O. NO.

PROJECT: SHEET 1 OF 1
CONTRACTOR: N/A
ADDRESS: FEDERAL NO. (S)

YOU ARE HEREBY DIRECTED TO MAKE THE HEREIN DESCRIBED CHANGES FROM THE PLANS AND SPECIFICATIONS OR DO THE FOLLOWING WORK DESCRIBED NOT INCLUDED IN THE PLANS AND SPECIFICATIONS ON THIS CONTRACT.

NOTE: This change order is not effective until approved by City Council or City Engineer Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work of contract price, agreed price and force account.

Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.

CHANGE REQUESTED BY: SUBMITTED BY: DATE: January 16, 2026 ESTIMATED COST:

ACCOUNT NO (S)

INCREASE

DECREASE
By reason of this order the time of City Council Approval Required YES completion will be adjusted as follows: NONE NO
Approved As to Form: CITY ATTORNEY Approved by the Council of City of Bakersfield Approval Recommended: Public Works Director Mayor
Countersigned: Finance Director Date
We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above.

Accepted, Date: Contractor: Title:

James Leonard, Solid Waste Director Breanne Banks, Secretary $393,026.00
Green Machine Sales, LLC
5 Gigante Drive
Hampstead, NH 03841
This Change Order provides for additional work associated with the City's Materials Recovery Facility (MRF) sorting line upgrade and redesign that was identified following execution of the original agreement. The additional work is required to support the operation of the Green Eye® Hyperspectral Optical Sorting System and was not included in the original contract scope.

The Change Order includes construction of a reinforced concrete pit and the furnishing and installation of an air compressor system necessary to supply compressed air to the optical sorters. Approval of this Change Order will allow completion of the MRF sorting line upgrade as designed and ensure proper installation and operation of the optical sorting equipment.
4210-44081-814-5080410-0000-P3K31800
2025-070 PA2600000201
City's Materials Recovery Facility (MRF)
sorting line redesign and upgrade
CHANGE ORDER NO.

Docusign Envelope ID: 6568B814-4058-442B-8D7E-32988B646D26 Pres. John F Green
John Green
Due to Volatile Steel Market ~ Prices are subject to change at time of order Prices good for thirty (30) days
CITY OF BAKERSFIELD - 241562 - ADD1 - PIT CONSTRUCTION & AIR COMPRESSOR

Page 1 of 1 ends

January 9th, 2025 Quote #: 241562 ADD1
City of Bakersfield Public Works Department
2260 South Union Avenue
Bakersfield, CA 93307
Attn: Renee Taylor
Dear Renee,
Thank you for the opportunity to provide an addendum to your SSR MRF project #241562 to construct a pit and provide an air compressor system. Our quotation and specifications are as follows:

PIT CONSTRUCTION
Pit Dimensions 83’L x 11’W x 5’ Deep
Pit Floor Reinforcement #4 Rebar 16” On Center
Pit Wall Reinforcement #4 Rebar 12” On Center
Pit Plating 4”W x 2” Deep Recession Around Pit Perimeter with 3/8” Thick Steel Diamond Plate Pit Plating
Pit Angle Reinforcement 4” x 4” x ½” Angle “J”-Bolt Welded to Inside of Angle Around Pit Perimeter
PIT CONSTRUCTION PRICE…………………………………………………. $194,250.00

DELIVERED & INSTALLED

AIR COMPRESSOR
ONE: ROTARY SCREW AIR COMPRESSOR
One rotary screw style air compressor designed to provide all necessary compressed air requirements to all four Green Eye ® Optical Sorters.

Flow Rate 608.03 CFM @ 125PSI
Drive Motor 125HP; 460V/3Ph/60Hz
Ambient Temperature (Max/Min) 115F/40F
Non-Ferrous Air Pipe Included; Non-ferrous distribution piping included and installed from air compressor to each respective Green Eye® Optical Sorter Fresh Air-Duct Included: Fresh air-duct from each Green Eye® Optical Sorter to building exterior included and installed; Existing building modifications required by others
AIR COMPRESSOR PRICE…………………………………………………… $198,776.00

DELIVERED & INSTALLED
5 Gigante Drive Hampstead, NH 03841 USA
Phone: (315) 303-5448 Fax: (315) 303-5583
Email: [email protected]
Designers, Manufacturers and Dealers of
Waste Processing Products & Services
TOTAL PRICE………………......……………………………..............……… $393,026.00 Docusign Envelope ID: 6568B814-4058-442B-8D7E-32988B646D26 Certificate Of Completion
Envelope Id: 6568B814-4058-442B-8D7E-32988B646D26
Status: Completed
Subject: Complete with Docusign: Green Machine Sales, LLC CCO No. 1.pdf Source Envelope:

Document Pages: 2
Signatures: 1
Envelope Originator:

Certificate Pages: 4
Initials: 0
City Clerk's Office
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
[email protected]
IP Address: 174.46.226.5
Record Tracking
Status: Original
2/25/2026 2:34:44 PM
Holder: City Clerk's Office
[email protected]
Location: DocuSign
Security Appliance Status: Connected
Pool: StateLocal
Storage Appliance Status: Connected
Pool: City of Bakersfield
Location: Docusign
Signer Events
Signature
Timestamp
John Green
[email protected]
Pres. John F Green
President
Security Level: Email, Account Authentication
(None)
Signature Adoption: Drawn on Device
Using IP Address:
2600:1017:b0c1:2a5a:bdac:71f:55e2:5703
Signed using mobile
Sent: 2/25/2026 2:51:48 PM
Resent: 3/3/2026 8:40:02 AM
Viewed: 3/7/2026 8:07:04 AM
Signed: 3/7/2026 8:07:18 AM
Electronic Record and Signature Disclosure:

Accepted: 3/7/2026 8:07:04 AM
ID: 2f59ab98-aa25-4d68-a265-adf84a1fead9
In Person Signer Events
Signature
Timestamp
Editor Delivery Events
Status
Timestamp
Agent Delivery Events
Status
Timestamp
Intermediary Delivery Events
Status
Timestamp
Certified Delivery Events
Status
Timestamp
Carbon Copy Events
Status
Timestamp
Witness Events
Signature
Timestamp
Notary Events
Signature
Timestamp
Envelope Summary Events
Status
Timestamps
Envelope Sent
Hashed/Encrypted
2/25/2026 2:51:48 PM
Certified Delivered
Security Checked
3/7/2026 8:07:04 AM
Signing Complete
Security Checked
3/7/2026 8:07:18 AM
Completed
Security Checked
3/7/2026 8:07:18 AM
Payment Events
Status
Timestamps
Electronic Record and Signature Disclosure

ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, City of Bakersfield (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system.

Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.

Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below.

Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below.

Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us.

All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/28/2022 10:51:05 AM Parties agreed to: John Green
Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us.

How to contact City of Bakersfield:

You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows:

To contact us by email send messages to: [email protected]

To advise City of Bakersfield of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at [email protected] and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address.

If you created a DocuSign account, you may update it with your new email address through your account preferences.

To request paper copies from City of Bakersfield
To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to [email protected] and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any.

To withdraw your consent with City of Bakersfield
To inform us that you no longer wish to receive future notices and disclosures in electronic format you may:
i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to [email protected] and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process..

Required hardware and software
The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements.

Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.

By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:
 You can access and read this Electronic Record and Signature Disclosure; and  You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and
 Until or unless you notify City of Bakersfield as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Bakersfield during the course of your relationship with City of Bakersfield.

Due to Volatile Steel Market ~ Prices are subject to change at time of order Prices good for thirty (30) days
CITY OF BAKERSFIELD - 241562 - ADD1 - PIT CONSTRUCTION & AIR COMPRESSOR

Page 1 of 1 ends

January 9th, 2025 Quote #: 241562 ADD1
City of Bakersfield Public Works Department
2260 South Union Avenue
Bakersfield, CA 93307
Attn: Renee Taylor
Dear Renee,
Thank you for the opportunity to provide an addendum to your SSR MRF project #241562 to construct a pit and provide an air compressor system. Our quotation and specifications are as follows:

PIT CONSTRUCTION
Pit Dimensions 83’L x 11’W x 5’ Deep
Pit Floor Reinforcement #4 Rebar 16” On Center
Pit Wall Reinforcement #4 Rebar 12” On Center
Pit Plating 4”W x 2” Deep Recession Around Pit Perimeter with 3/8” Thick Steel Diamond Plate Pit Plating
Pit Angle Reinforcement 4” x 4” x ½” Angle “J”-Bolt Welded to Inside of Angle Around Pit Perimeter
PIT CONSTRUCTION PRICE…………………………………………………. $194,250.00

DELIVERED & INSTALLED

AIR COMPRESSOR
ONE: ROTARY SCREW AIR COMPRESSOR
One rotary screw style air compressor designed to provide all necessary compressed air requirements to all four Green Eye ® Optical Sorters.

Flow Rate 608.03 CFM @ 125PSI
Drive Motor 125HP; 460V/3Ph/60Hz
Ambient Temperature (Max/Min) 115F/40F
Non-Ferrous Air Pipe Included; Non-ferrous distribution piping included and installed from air compressor to each respective Green Eye® Optical Sorter Fresh Air-Duct Included: Fresh air-duct from each Green Eye® Optical Sorter to building exterior included and installed; Existing building modifications required by others
AIR COMPRESSOR PRICE…………………………………………………… $198,776.00

DELIVERED & INSTALLED
5 Gigante Drive Hampstead, NH 03841 USA
Phone: (315) 303-5448 Fax: (315) 303-5583
Email: [email protected]
Designers, Manufacturers and Dealers of
Waste Processing Products & Services
TOTAL PRICE………………......……………………………..............……… $393,026.00