1 | Page

Multi-Modal Transportation & Traffic Safety Committee Bi-Monthly Report June 2026

Projects
The City of Bakersfield Public Works Department is committed to identifying, planning, and implementing traffic calming improvements that enhance safety and mobility throughout the community. These initiatives are designed to improve roadway conditions for all users, with particular emphasis on increasing safety and accessibility for pedestrians, bicyclists, and other vulnerable road users.

By strategically prioritizing corridors and neighborhoods with elevated traffic volumes, safety concerns, and significant pedestrian activity, the Department seeks to reduce collisions, improve roadway operations, and support a more balanced transportation network. These efforts also contribute to broader City goals related to multimodal mobility, neighborhood livability, and sustainable transportation.

The following provides a summary of current and completed projects that incorporate traffic calming and multimodal transportation improvements. Each project reflects the City’s ongoing commitment to enhancing transportation safety, improving accessibility, and creating a more connected, resilient, and equitable community for residents and visitors alike.
*Grant Funded
Complete Streets
Project Execution Status
Complete Streets along Stine
Rd: Ming Ave to Wilson Rd
APD (Design)
Streets (Install) Construction Complete
Complete Streets along Baker
St: Monterey St to 21st St*
APD (Design)
Streets (Install) 90% Design reached.

Corridor Enhancements:

Chester Ave
Design Engineering (Design)
Contractor (Install)
Design Complete. Advertisement pending
additional funding.

Corridor Enhancements: 18th St
and 19th St
Design Engineering (Design)
Contractor (Install) Construction in Progress
Corridor Enhancements: MLK
Blvd*
Consultant (Design)
Contractor (Install) Design at 80%.

Corridor Enhancements:

Monitor St
Consultant (Design)
Contractor (Install)
Phase 1 at 100% Design. Phase 2 pending ATP
funding.

Corridor Enhancements: H St* Consultant (Design)
Contractor (Install)
Council approval on 6/10. Set to begin
construction.

Corridor Enhancements: Niles
St & Monterey St
Consultant (Design)
Contractor (Install)
Design at 90%. Phase 1 Construction funding
request for FY26/27.

2 | Page

Traffic Calming and Pedestrian Improvements
Project Execution Status
Traffic Calming - Oleander Ave: California
Ave to Brundage Ln
APD (Design)
Streets (Install) Completed
Pedestrian Improvements - Wible Rd:

Berkshire Rd to Panama Ln
APD (Design)
Contractor (Install)
Design at 100%. Construction funding
request for FY26/27.

Rapid Rectangular Flashing Beacon - Truxtun
Ave at Pine St*
APD (Design)
Contractor (Install) Awarded. Construction underway.

Rapid Rectangular Flashing Beacon - Chester
Ave at 22nd St*
APD (Design)
Contractor (Install) Design Complete. Set to re-bid.

Pedestrian Improvements: Q St and Espee St Design Engineering (Design) Contractor (Install) Phase 1 of Construction Complete.

Speed Hump – Christmas Tree Ln APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Gasoline Alley Dr APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Sundale Ave APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Jewett Ave APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – O St APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Real Rd APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Beech St APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Custer Ave APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – District Blvd APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Speed Hump – Sandra Dr APD (Design)
Streets (Install)
Design Complete. Multi Modal Funding
requested for FY 26/27
Flashing Beacons: Norris Rd & Stiern Middle
School
APD (Design)
Contractor (Install) Construction complete.

Garces Memorial Circle Enhancement Consultant (Design)
Contractor (Install) Construction Complete
Flashing Beacon: Veterans Elem, Warren Jr
High*
APD (Design)
Contractor (Install) Construction Complete
Flashing Beacon: Calloway Dr (Norris),
Monitor St*
APD (Design)
Contractor (Install) Construction Complete

Speed Hump – Las Entradas
APD (Design)
Streets (Install)
Construction Complete

Flashing Beacon: Golden Valley High School APD (Design) Contractor (Install)
Construction Complete

Radar Feedback Signs: Various Locations* APD (Design)
Contractor (Install) Construction Complete
Reflective Signal Backplates: Various
Locations*
APD (Design)
Contractor (Install) Construction Complete
Rectangular Rapid Flashing Beacon: Heritage
Park/Mt Vernon Ave
APD (Design)
Contractor (Install) Construction Complete
Traffic Calming Demo - Beale Ave: Niles St
and Monterey St
APD (Design)
Contractor (Install) Construction Complete
3 | Page

Speed Hump – Marella Way @ Stockdale
Christian School
APD (Design)
Streets (Install) Construction Complete
Speed Hump – Sandra Dr and Laurel Dr APD (Design)
Streets (Install) Construction Complete
Speed Hump – Summertree Ln and Canter
Way
APD (Design)
Streets (Install) Construction Complete
Speed Hump – El Potrero Ln and Mesa
Grande St
APD (Design)
Streets (Install) Construction Complete
Speed Hump – Dennen St APD (Design)
Streets (Install) Construction Complete
Speed Hump – Abbott Dr APD (Design)
Streets (Install) Construction Complete

Bike Trails
Project Execution Status
Stonecreek Loop: Class IV Cycle Track APD (Design)
Contractor (Install)
Design at 100%. Finalizing funding and
advertisement plan.

Kentucky St Urban Greening - Beale Ave to Baker
St, Canal to Mt Vernon Ave*
APD (Design)
Contractor (Install)
60% Design. Coordinating with County of
Kern
Beach Park Bridge Consultant (Design)
Environmental permitting and review.

Concept selected. Additional Design Funding
requested for FY26/27. Contract amended for
30% design.

Multi-Use Path: Friant-Kern Canal* Consultant (Design)
Contractor (Install) Under Construction.

Bike Lane: Old County Dump Rd* APD (Design)
Streets (Install) Construction Complete
Multi-Use Path: Stockdale Ranch Consultant (Design)
Contractor (Install) Construction Complete

Strategy
The Public Works Department is committed to advancing continuous improvement throughout the City by identifying, evaluating, and implementing initiatives that enhance residents’ quality of life. In addition to responding to community needs and public requests, the Department prioritizes efforts that improve transportation safety and accessibility near schools, expand and enhance multimodal transportation infrastructure, and revitalize key historic corridors.

A significant component of these efforts is the ongoing transformation of the Downtown core and Old Town Kern areas, which serve as important centers for commerce, culture, and community activity. Through these strategic investments and improvement initiatives, the Department seeks to promote a safer, more accessible, sustainable, and resilient community while supporting the City’s long-term growth and development objectives.

4 | Page

Funding
Safe Streets & Roads 4 All (SS4A): The Safe Streets and Roads for All Program is a U.S.

Department of Transportation initiative that provides funding to local governments and regional entities for planning and implantation projects focused on reducing crashes and improving road safety. The program aims to support efforts on sustainable transportation solutions, particularly for vulnerable road users like pedestrians and cyclists. • City of Bakersfield Comprehensive Safety Action Plan
o Project initiation is contingent upon completion of the FY 2026/27 budget process and authorization of funding.

Transformative Climate Communities (TCC): The Transformative Climate Communities (TCC) program is a California initiative that provides funding to disadvantaged communities for projects that reduce greenhouse gas emissions, improve public health, and enhance local economic opportunities. It aims to support community-driven climate resilience efforts through integrated strategies that address both environmental and social equity challenges.
• Complete Streets Improvements: Dr. Martin Luther King Jr. Blvd Community Project Funding Grant (CPF): The Community Project Funding (CPF) program allocates federal funds to support local initiatives that address specific community needs, such as affordable housing, infrastructure improvements, and economic development.

These funds are directed toward projects that benefit low- and moderate-income communities, helping to enhance living conditions and promote sustainable growth. • Complete Streets Improvements: Dr. Martin Luther King Jr. Blvd • Monitor St Active Transportation Improvements – Phase I Active Transportation Program (ATP): The Active Transportation Program (ATP) is a California initiative that provides funding for projects that promote walking, biking, and other forms of active transportation. It focuses on improving safety, mobility, and access, particularly for disadvantaged communities, while encouraging healthier and more sustainable transportation options.
• ‘H’ Street Corridor Improvements (Cycle 6 - Funded)
• Monitor St Active Transportation Improvements Project (Cycle 7 – Unfunded) • Cycle 8 Application to include:
o Phase 2 of Monitor Street Complete Streets
o Niles and Monterey Corridor Enhancements
Congestion Mitigation and Air Quality (CMAQ): The Congestion Mitigation and Air Quality (CMAQ) program is a federal initiative that provides funding to state and local governments for projects aimed at reducing traffic congestion and improving air quality.

It supports efforts to enhance transportation systems, promote clean vehicle technologies, and encourage alternatives to driving, such as public transit and non- motorized transportation.
• ‘H’ Street Safety Improvements (FY 25/26)
• 18
th & 19th Street Improvements (FY 25/26) – Under Construction • Monitor Street Active Transportation Improvements – Phase I 5 | Page

Transportation Development Act (TDA-3): The Transportation Development Act (TDA-3) is a California funding program that provides financial support for public transportation and bicycle/pedestrian projects through a portion of the state's sales tax revenue. TDA-3 specifically allocates funds to support transit services, including those that serve rural and smaller communities, promoting accessibility and sustainable transportation options. • Rapid Rectangular Flashing Beacons on Truxtun Avenue at Pine Street (Funded and under construction)
• Rapid Rectangular Flashing Beacons on Chester Avenue at 22nd Street (Funded and set to bid)
• Pedestrian Improvements along Potomac at UPRR Crossing (FY 26/27 Co-Applicant with Kern County)