Text extracted from the city's file for reading and search. Open the original on pub-bakersfield.escribemeetings.com. That file is the official record.

9100 Ming Avenue, Suite 202 | Bakersfield, CA 93311 | 661.748.3893| www.ardurra.com

May 12, 2026

Mr. Dillon O’ Donohue, Engineer III
City of Bakersfield
1000 Buena Vista Rd.

Bakersfield, CA 93311

SUBJECT: L-208 TCP Removal Project
Amendment No. 3 – Evaluate the use of Bag Filters, Additional RSSCT Coordination, Chlorine Analyzers, and DDW Permitting

Dear Mr. Donohue:

Ardurra is pleased to provide this amendment to include the following design services:

 Investigation, calculations and recommendations associated with adding Variable Frequency Drive (VFDs) and connecting the well to the distribution system including sizing of the pump impeller
 Work related to modifying, upgrading, revising the oxygen injection system  Specifications for a third party vendor for the carbon fill, backwashing, etc to test the system together during startup

SCOPE OF WORK

Task 1.1 – VFDs and Connection of Well to Distribution System  Perform pump calculations and modeling pump with VFD performance for standard operation and pumping to distribution system which resulted in pump selection recommendations and sizing of pump impeller
 Coordination with City and City’s pump supplier to provide final pump selection

Task 1.2 – Modify Oxygen Injection System
 Coordination with City on the oxygen injection system

Task 1.3 – Specifications for Carbon Fill/Backwash Testing  Provide Specifications for a third party to fill the carbon system, backwash it, and provide startup and testing support

Mr. Donohue
May 12, 2026

Page 2 of 2 ends

9100 Ming Avenue, Suite 202 | Bakersfield, CA 93311 | 661.748.3893| www.ardurra.com Task 1.4 – Chlorine Analyzers
 Revise drawings and Specifications (civil, mechanical, electrical and instrumentation) to add chlorine analyzers, relocate sample station, sample lines and connection and valves to the design documents

PROJECT FEE

$284,895 Original Contract (approved April 23, 2025)
$42,305 Amendment No. 1
$27,470 Amendment No. 2
$73,405 Amendment No. 3

$428,075 New Contract Amount

We appreciate the opportunity to provide our proposed scope and fee to the City for this work and would be happy to discuss it further with the City. If you have any questions, please do not hesitate to contact me at 661.748.3893 or [email protected].

Sincerely,

Dolores Salgado, PE
Client Service Manager

Enclosures: Fee Proposal

City of Bakersfield
L-208 Well Treatment
Amendment 3 Fee Schedule
Project
Director
Project
Manager
Project
Engineer III
CAD
Designer
Sr. Electrical
Engineer
Electrical
Engineer
Sr. I&C
Engineer
I&C
Engineer Labor Hrs Labor Costs
Billing Rate 305$ 270$ 190$ 175$ 270$ 125$ 270$ 170$ Task 1 Additional Design Services 8 82 96 132 0.5 24 1 24 162 73,405$ 73,405$

1.1 VFDs and Connection of Well to Distribution
System 2 28 44 38 112 23,180 $ 23,180 $

1.2 Modify Oxygen Injection System 2 2 4 8 16 3,310 $ 3,310 $

1.3 Specifications for Carbon Fill/Backwash Testing 2 8 24 34 7,330 $ 7,330 $

1.4 Chlorine Analyzer 2 44 24 86 0.5 24 1 24 205.5 39,585 $ 39,585 $ 8 82 96 132 0.5 24 1 24 128
2,440 $ 22,140 $ 18,240 $ 23,100 $ 135 $ 3,000 $ 270 $ 4,080 $ 73,405 $ 73,405 $ Total Hours:

Amendment No. 3