ADMINISTRATIVE REPORT

MEETING DATE: August 26, 2026 AGENDA CATEGORY: Consent - Bids TO: Honorable Mayor and City Council
FROM: Zachary Meyer, Public Works Director
DATE: August 4, 2026
SUBJECT: Stonecreek Loop Cycle Track

Accept bid and approve contract with J.L. Plank Inc. dba Cen-Cal Construction for $528,825.00 (Ward 7)

RECOMMENDATION:

Staff recommends acceptance of low bid and approval of contract.

BACKGROUND:

The proposed project will provide improve d bicycle safety features primarily serving the Stonecreek community. Residents frequently make use of existing bicycle and pedestrian infrastructure for recreation and daily commutes. Located in direct proximity to the proposed project are 9 schools including, but not limited to, Stonecreek Jr High School, Panama Elementary School, and Ridgeview High School. Also located in the area are 8 religious worship centers including , but not limi ted to, Ridgeview Community Church, Gurdwara Guru Angad Darbar, and Daybreak Baptist Church. Proposed improvements will improve safety by providing a barrier to protect and increase the distance of cyclists and pedestrians from vehicle traffic.

The Stonecreek Loop Cycle Track is a pilot project comprised of established safety solutions with minor impact to existing infrastructure. If deemed successful, the safety improvements can easily be applied to numerous other locations throughout the municipality.

The work to be performed consists, in general, of installing a two-way cycle track with a concrete median and associated signage surrounding the Stonecreek Community, modifying the sidewalk at Stonecreek Park, and modifying existing pavement striping, all in conformance with the contract documents. The Engineer’s Estimate for this project is $907,000.

Item No. 1: On July 16, 2026, a total of two (2) bids were received. The bids are as follows:

J.L. Plank Inc. dba In the amount of $528,825.00 Cen-Cal Construction
31207 Denbeste Ct
Shafter, CA 93263

Kern County Custom Concrete In the amount of $890,914.34 7505 Terry John Ave
Bakersfield, CA 93308

Cen-Cal Construction is considered the lowest responsive bidder and staff recommends approv al of the contract.

FISCAL IMPACT:

This project (T4K325) is fully funded by Public Safety & Vital Services (PSVS).

COUNCIL GOAL:

Reliable Infrastructure
Safety and Resilience
Community Character & Quality of Life