Cities Index.
2025 COB UWMP Final.pdf

Bakersfield City Council
September 16, 2026

Document
2025 COB UWMP Final.pdf
Meeting
September 16, 2026
Body
Bakersfield City Council
Pages
5
Original file
24.4 MB
Text extracted from the city's file for reading and search. Open the original on pub-bakersfield.escribemeetings.com. That file is the official record.

City of Bakersfield
2025 Urban Water Management Plan

City of Bakersfield i
2025 Urban Water Management Plan
Table of Contents
_____________________________________________________________________________________ Section 1 : Introduction and Lay Description ............................................................................................ 1-1

1.01 Background and Purpose ................................................................................................ 1-1

1.02 Report Organization......................................................................................................... 1-2

1.03 Lay Description - Fundamental Determinations of the UWMP ........................................ 1-2 Section 2 : Plan Preparation ..................................................................................................................... 2-1

2.01 Agency Identification........................................................................................................ 2-1

2.02 Coordination and Outreach ............................................................................................. 2-2 Section 3 : System Description ................................................................................................................. 3-1

3.01 General Description ......................................................................................................... 3-1

3.02 Service Area Climate ....................................................................................................... 3-1

3.03 Service Area Population and Demographics ................................................................... 3-2

3.04 Land Uses within Service Area ........................................................................................ 3-4 Section 4 : Water Use Characterization ................................................................................................... 4-1

4.01 Past, Current, and Projected Water Use ......................................................................... 4-1

4.02 Future Water Savings and Water Use for Lower Income Households ............................ 4-4

4.03 Distribution System Water Losses ................................................................................... 4-5

4.04 Climate Change Considerations ...................................................................................... 4-6 Section 5 : SB X7-7 Baselines, 2020 Targets, and 2025 Reporting ........................................................ 5-1 Section 6 : Water Supply Characterization ............................................................................................... 6-1

6.01 Purchased or Imported Water ......................................................................................... 6-1

6.02 Groundwater .................................................................................................................... 6-1

6.03 Surface Water .................................................................................................................. 6-3

6.04 Stormwater ...................................................................................................................... 6-3

6.05 Wastewater and Recycled Water .................................................................................... 6-3

6.06 Desalinated Water Opportunities ..................................................................................... 6-6

6.07 Exchanges and Transfers ................................................................................................ 6-6

6.08 Supply from Storage ........................................................................................................ 6-7

6.09 Other ................................................................................................................................ 6-7

6.10 Future Water Projects ...................................................................................................... 6-7

6.10.1 Expand Recycled Water Use .............................................................................. 6-7

6.11 Summary of Existing and Planned Sources of Water ..................................................... 6-8

6.12 Energy Use .................................................................................................................... 6-10 City of Bakersfield ii
2025 Urban Water Management Plan
Section 7 : Water Service Reliability and Drought Risk Assessment ....................................................... 7-1

7.01 Water Service Reliability Assessment ............................................................................. 7-1

7.02 Description of Management Tools and Options .............................................................. 7-6

7.03 Drought Risk Assessment ............................................................................................... 7-6 Section 8 : Water Shortage Contingency Plan ......................................................................................... 8-1

8.01 Water Supply Reliability Analysis .................................................................................... 8-1

8.02 Annual Water Supply and Demand Assessment Procedures ......................................... 8-1

8.03 Six Standard Water Shortage Levels .............................................................................. 8-2

8.04 Shortage Response Actions ............................................................................................ 8-3

8.04.1 Seismic Risk Assessment and Mitigation Plan ................................................... 8-7

8.05 Communication Protocols ................................................................................................ 8-7

8.06 Compliance and Enforcement (Municipal Water System Service Area) ......................... 8-8

8.07 Legal Authorities .............................................................................................................. 8-8

8.08 Financial Consequences of WSCP ................................................................................. 8-8

8.09 Monitoring and Reporting (Municipal Water System Service Area) ................................ 8-9

8.10 WSCP Refinement Procedures (Municipal Water System Service Area) ....................... 8-9

8.11 Special Water Feature Distinction (Municipal Water System Service Area) ................... 8-9

8.12 Plan Adoption, Submittal and Availability ...................................................................... 8-10 Section 9 : Demand Management Measures ........................................................................................... 9-1

9.01 Demand Management Measures .................................................................................... 9-1

9.01.1 Water Waste Prevention Ordinances (Municipal Water System) ....................... 9-1

9.01.2 Metering .............................................................................................................. 9-1

9.01.3 Conservation Pricing (Municipal Water System) ................................................ 9-2

9.01.4 Public Education and Outreach .......................................................................... 9-2

9.01.5 Programs to Assess and Manage Distribution System Real Loss (Municipal Water System) ............................................................................................................... 9-2

9.01.6 Water Conservation Program Coordination and Staffing Support ..................... 9-2

9.01.7 Other Demand Management Measures ............................................................. 9-3

9.01.8 Asset Management (Wholesale Water System) ................................................. 9-3

9.01.9 Wholesale Supplier Assistance Programs ......................................................... 9-3

9.01.10 Implementation over the Past Five Years .......................................................... 9-3

9.01.11 Implementation to Achieve Water Use Targets (Municipal Water System) ....... 9-4 Section 10 : Plan Adoption, Submittal, and Implementation .................................................................. 10-1

10.01 Public Notice .................................................................................................................. 10-1

10.02 Plan Adoption, Submittal, and Implementation ............................................................. 10-1 City of Bakersfield iii
2025 Urban Water Management Plan
Plates
1 Water Purveyors in the City of Bakersfield
2 City of Bakersfield Municipal Water System Service Area Boundary 3 City of Bakersfield Water System Boundary and Municipal Boundary 4 City of Bakersfield Water Facilities
Appendices
A Notices
B Resolution Adopting 2025 UWMP Update
C Climate Change Information from Kern County Subbasin GSP D Table 2-2 From Kern River Flow and Municipal Water Program EIR E City of Bakersfield Municipal Code Chapters
F Water Shortage Contingency Plan
G AWWA Water Audit Reporting Worksheets
H Multi-Jurisdiction Hazard Mitigation Plan – City of Bakersfield I 2025 Municipal Water System Water Rate Schedules
J UWMP Act Checklist
City of Bakersfield iv
2025 Urban Water Management Plan
List of Acronyms and Abbreviations
AB Assembly Bill
Act Urban Water Management Planning Act
AF Acre-feet
AWWA American Water Works Association
BMP(s) Best management practice(s)
Cal Water California Water Service Company
CASGEM California Statewide Groundwater Elevation Monitoring CEQA California Environmental Quality Act
CII Commercial, industrial, and institutional
CIMIS California Irrigation Management Information System City City of Bakersfield
Corps Army Corps of Engineers
CPUC California Public Utility Commission
CSD Community Services District
CWC California Water Code
DMM(s) Demand management measure(s)
DOF Department of Finance
DRA Drought Risk Assessment
DWR California Department of Water Resources
EC Electrical Conductivity
EIR/EIS Environmental Impact Report/Environmental Impact Statement ET Evapotranspiration
GHG Greenhouse gas
GIS Geographic Information System
GPCD Gallons per capita per day
GPSCD Gallons per service connection per day GSA Groundwater Sustainability Agency
GSP Groundwater Sustainability Plan
Guidebook DWR 2020 Urban Water Management Plans Guidebook for Urban Water Suppliers ID4 Improvement District No. 4
IRWM Integrated Regional Water Management
IRWMP(s) Integrated Regional Water Management Plan(s)
KCSGSP Kern County Subbasin Groundwater Sustainability Plan KCWA Kern County Water Agency
Kern COG Kern Council of Governments
KRGSA Kern River Groundwater Sustainability Agency
MCL Maximum Contaminant Level
M&I Municipal and Industrial
MGD Million gallons per day
mg/l Milligrams per liter
MOU Memorandum of Understanding
MTBE Methyl Tertiary Butyl Ether
MWC Mutual Water Company
Plan (or UWMP) Urban Water Management Plan
RTP Regional Transportation Plan
SB Senate Bill
SB X7-7 Water Conservation Bill of 2009
SCADA Supervisory Control and Data Acquisition
SWRCB State Water Resources Control Board
City of Bakersfield v
2025 Urban Water Management Plan
SWRCB-DDW State Water Resources Control Board – Division of Drinking Water SWP State Water Project
TCP 1,2,3-Trichloropropane
TDS Total Dissolved Solids
Tenneco Tenneco West
UWMP Urban Water Management Plan
WSA Water Supply Assessment
WSCP Water Shortage Contingency Plan
WUE Water Use Efficiency
WWTP Wastewater Treatment Plant
City of Bakersfield 1-1
2025 Urban Water Management Plan
Section 1: Introduction and Lay Description

1.01 Background and Purpose
The California Urban Water Planning Act (Act) requires urban water suppliers that have 3,000 or more service connections or supply 3,000 or more acre-feet (AF) of water per year to develop an Urban Water Management Plan (UWMP or Plan), which is submitted to the California Department of Water Resources (DWR) every five years. No significant changes were made to the Act since the previous UWMP was prepared in 2020, only definitions have been added or updated.

This 2025 UWMP Update has been prepared in accordance with the January 2026 “Urban Water Management Plan Guidebook” (Guidebook) prepared by DWR. The format of the Plan generally follows the recommended organization in Chapter 1.3 of the Guidebook and incorporates the required standardized tables as numbered and shown in the Guidebook and as appropriate for the City’s wholesale and retail operations. Some of the tables are not applicable to the respective systems and are not included as noted in the text.

As noted in the Guidebook, the focus of a UWMP requires addressing the following water planning fundamentals:
 Preparing a detailed look at current and future water use, including assessing available baseline data and examining long-term planning documents like General Plans and Specific Plans.  Analyzing potable and non-potable water supplies, including reviewing water rights and contracts, assessing water deliveries, ascertaining restrictions on water availability under certain regulatory and hydrological conditions, and other opportunities or limitations for each water supply.  Analyzing water supply reliability by integrating the water-use analyses with the water supply analyses to provide a water service reliability picture under normal conditions, single dry year conditions, and five consecutive dry years through at least 2045.  Preparing a realistic Drought Risk Assessment (DRA) by including integrated water supplies and projected water use in a hypothetical five-year drought condition.  Developing an effective Water Shortage Contingency Plan (WSCP) that specifies opportunities to reduce demand and augment supplies under numerous, and even unpredictable, water shortage conditions.

This 2025 UWMP includes both the City of Bakersfield’s (City’s) Municipal Water System (retail) and Wholesale Water System (wholesale). The 2025 UWMP is an update to the 2020 UWMP adopted by the City. However, the 2025 UWMP is considered a stand-alone document.

This 2025 UWMP does not directly address the City’s urban water use objectives (UWUOs) established under the State Water Board’s Making Conservation a California Way of Life Regulation on Urban Water- Use Efficiency Standards, Objectives, and Performance Measures (Making Conservation a California Way of Life regulation) since UWUO compliance is not part of UWMP content requirements. However, continued implementation of demand management measures are anticipated as the City works to achieve compliance with its UWUOs which will result in a reduction in per capita water usage.

City of Bakersfield 1-2
2025 Urban Water Management Plan

1.02 Report Organization
The UWMP contains ten sections as outlined below:
 Section 1 – Introduction and Lay Description
 Section 2 – Plan Preparation
 Section 3 – System Description
 Section 4 – Water Use Characterization
 Section 5 – SB X7-7 Baselines, Targets, and 2020 Compliance  Section 6 – Water Supply Characterization
 Section 7 – Water Supply Reliability and Drought Risk Assessment  Section 8 – Water Shortage Contingency Plan
 Section 9 – Demand Management Measures
 Section 10 – Plan Adoption, Submittal, and Implementation

1.03 Lay Description - Fundamental Determinations of the UWMP ______________________________________________________________________________________ California Water Code
Each plan shall include a simple lay description of how much water the agency has on a reliable basis, how much it needs for the foreseeable future, what the agency’s strategy is for meeting its water needs, the challenges facing the agency, and any other information necessary to provide a general understanding of the agency’s plan (10630.5). ______________________________________________________________________________________ As detailed in the following sections of this UWMP, the City of Bakersfield’s (City) Municipal Water System and Wholesale Water System have sufficient water supplies to meet the needs of their customers for the next twenty years and beyond. Fundamental determinations in this UWMP are summarized as follows.

Water System Description
The Municipal Water System is a retail water supplier managed by the City’s Water Department and operated under a service contract with California Water Service Company (Cal Water). The service area boundaries for the Municipal Water System include only a portion of the City of Bakersfield. Remaining areas of the City are served by other retail water suppliers. The primary source of supply for the Municipal Water System is groundwater and recharged surface water supplies pumped from City owned wells. This is supplemented by water from surface water treatment plants owned by Cal Water and Kern County Water Agency Improvement District No. 4 (KCWA ID4). In 2025, the City’s Municipal Water System service area consisted of 51,559 municipal connections and it supplied a volume of 46,149 acre-feet of water to its service area.

The City’s Wholesale Water System is operated by the City’s Water Department which oversees the City’s Kern River water rights and water supplies. Kern River water supplies are either delivered to surface water treatment plants for subsequent use by retail water suppliers within the City area or are replenished to the groundwater basin for the benefit of the City and other retail water suppliers through their respective groundwater wells. A volume of 56,406 acre-feet of Kern River surface water was delivered through the Wholesale Water System during 2025.

Water Use Projections
The City has adopted General Plan and Zoning Ordinances which include land use goals, policies, and implementation measures for development. Proposed land uses within the City’s Municipal Water Service Area per the General Plan are similar to current land uses within the City. These primarily consist of City of Bakersfield 1-3
2025 Urban Water Management Plan
residential uses with some commercial, light industrial, schools, and parks. Population growth is anticipated to be about 1.4 percent annually based on historic growth rates and population projections developed by Kern Council of Governments.

The continued implementation of demand management measures to meet the UWUOs established by the State’s Making Conservation a California Way of Life regulation will result in decreasing per capita water use in the future. Water demands in the Municipal Water System service area are projected to total approximately 47,555 acre-feet annually in 2045, which is nearly the same as 2025 water usage. Water demands in the Wholesale Water System for delivery to surface water treatment plants and groundwater recharge are projected to total 100,000 acre-feet annually. The City’s projected water usage estimates are expected to adequately address climate change impacts during the period covered by this UWMP.

Water Supplies and Reliability
The City pumps groundwater and recharged surface water from the Kern County Subbasin of the San Joaquin Valley Groundwater Basin (Groundwater Basin No. 5-22.14) which is currently non-adjudicated. The Kern County Subbasin is designated as critically overdrafted and identified as a high-priority basin in the latest version of Bulletin 118 published by the DWR.

The City is a member of the Kern River Groundwater Sustainability Agency (KRGSA) which was formed in compliance with the Sustainable Groundwater Management Act (SGMA) to cooperatively manage local groundwater in a sustainable manner. The KRGSA subsequently became a participant in the Kern County Subbasin Groundwater Sustainability Plan (KCSGSP), with the intent to coordinate groundwater management throughout the entire 2,800 square mile Subbasin. An Amended KCSGSP was adopted in August 2025 and submitted to the State Water Board and DWR for review.

The KCSGSP includes management actions and proposes projects to maintain the groundwater resource in a sustainable condition under future climate change conditions through the year 2070. As a result of the ongoing management of the groundwater basin, the City’s groundwater and recharged surface water supplies are anticipated to be sufficient to meet its demands for the next 50 years and beyond. The City’s groundwater operations are subject to conformance with the requirements of the KCSGSP.

The Municipal Water System has sufficient redundancy to allow wells and other facilities to be taken offline as needed for maintenance or repairs. The City has installed standby generators at its well facilities so that it can continue to provide water supplies in the event of an electrical power outage. Wellhead groundwater treatment facilities have been installed where necessary to continue providing water supplies that meet current potable water standards. The City will construct new wells or rehabilitate existing wells as required to meet water demands. Groundwater wells will be equipped with wellhead treatment as necessary to remove contaminants that exceed water quality standards. When SWP supplies are not available from KCWA ID4, the City can deliver its Kern River supplies to KCWA ID4 for treatment in place of SWP supplies.

The Wholesale Water System provides groundwater recharge of Kern River water supplies both by transportation through the Kern River and unlined portions of the Carrier Canal and within groundwater replenishment areas such as the City’s 2800 Acres recharge facility, Truxtun Lakes, Aera Park, and the Park at Riverwalk. The Environmental Impact Report (EIR) for the Kern River Flow and Municipal Water Program estimated the City’s Kern River water supplies for both urban use and the City’s fulfillment of various contractual obligations average about 135,000 acre-feet per year. Approximately 100,000 acre-feet of the 135,000 acre-feet is designated for urban use The City has storage rights in Lake Isabella that allows for flexibility in the management of its Kern River supplies.

Water Shortage Contingency Planning
The City’s adopted its 2020 Water Shortage Contingency Plan (WSCP) as a part of its 2020 UWMP. The adopted WSCP provides measures, referred to as response actions, to be implemented in the event of water City of Bakersfield 1-4
2025 Urban Water Management Plan
shortages. The intent of the water conservation measures and progressive restrictions on water use identified in the City’s WSCP are to provide guidance to the City in managing and mitigating anticipated water supply shortages. The structured steps are designed to allow the City to assess its available water supplies and implement appropriate measures in response to actual conditions so that water shortages can be managed efficiently, predictably, and with accountability.

A water shortage condition is defined as when available water supplies are insufficient to meet the normally expected customer demands. Water shortage conditions may be a result of population growth, climate change, drought, catastrophic events, or other water shortage emergencies declared by either the City, State or Federal government.

In accordance with Water Code requirements, there are six standard water shortage levels and response actions defined in the City’s WSCP that increase restrictions on water use in response to increasing levels of water shortage conditions ranging from 10 percent to greater than 50 percent.

The City’s WSCP is a stand-alone document. The response actions and other considerations in the City’s WSCP will be reviewed on a periodic basis to determine the effectiveness of the implementation of the various measures to achieve the desired water demand reductions. Proposed revisions to the WSCP will be submitted to the City Council for adoption.

Demand Management Measures
The City has implemented demand management measures (DMMs) to achieve its water conservation targets. The City partners with Cal Water for the implementation of its Water Conservation Program. Cal Water maintains a Water Conservation Program Coordinator that oversees the water conservation programs available to the City’s Municipal Water System service area customers. The City will continue with the implementation of its existing DMMs and look for ways to improve water use efficiency as it works toward compliance with its established UWUOs.

City of Bakersfield 2-1
2025 Urban Water Management Plan
Section 2: Plan Preparation

2.01 Agency Identification
The City’s Municipal Water System is a retail urban water supplier. The Municipal Water System is managed by the City’s Water Department and operated under a service contract with California Water Service Company (Cal Water). The service area boundaries for the Municipal Water System include only a portion of the City of Bakersfield. Remaining areas of the City are served by other retail water purveyors. The primary source of supply for the Municipal Water System is recharged Kern River water and groundwater pumped from City owned wells. This is supplemented by treated Kern River water and occasional supplies of treated State Water from surface water treatment plants owned by Cal Water and Kern County Water Agency Improvement District No. 4 (KCWA ID4). Cal Water provides billing services and prepares and submits the electronic Annual Reports (eARs) on behalf of the City to the State Water Resources Control Board Division of Drinking Water (SWRCB-DDW).

In 2025, the City’s Municipal Water System service area consisted of 51,559 municipal connections and it supplied a volume of 46,149 acre-feet of water to its service area per Cal Water billing reports. See Table 2-

1. Table 2-1 Retail Only: Public Water Systems
Public Water System
Number
Public Water System
Name
Number of Municipal
Connections 2025
Volume of
Water Supplied
2025 (AF)
1510031 City of Bakersfield 51,559 46,149
TOTAL 51,559 46,149
NOTES: Number of connections and volume of water supplied per Cal Water billing reports.

Number of municipal connections is the average for 2025.

The City’s Wholesale Water System is operated by the City’s Water Department which oversees the City’s Kern River water rights and water supplies. Through the Wholesale Water System, raw Kern River water supplies are provided for groundwater replenishment and to surface water treatment plants.

This 2025 UWMP is an individual plan. The City is not part of a regional alliance. See Table 2-2.

The City is both a retail urban water supplier through its Municipal Water System and a wholesale urban water supplier through its Wholesale Water System. Information in this UWMP is presented in Calendar Year format and water quantities are presented in Acre Feet. See Table 2-3.

City of Bakersfield 2-2
2025 Urban Water Management Plan

2.02 Coordination and Outreach
______________________________________________________________________________________ California Water Code
Each urban water supplier shall coordinate the preparation of its plan with other appropriate agencies in the area, including other water suppliers that share a common source, water management agencies, and relevant public agencies, to the extent practicable (10620(d)(3)).

Each urban water supplier shall encourage the active involvement of diverse social, cultural, and economic elements of the population within the service area prior to and during the preparation of both the plan and the water shortage contingency plan (10642).

An urban water supplier that relies upon a wholesale agency for a source of water shall provide the wholesale agency with water use projections from that agency for that source of water in five-year increments to 20 years or as far as data is available. The wholesale agency shall provide information to the urban water supplier for inclusion in the urban water supplier's plan that identifies and quantifies, to the extent practicable, the existing and planned sources of water as required by subdivision (b), available from the wholesale agency to the urban water supplier over the same five-year increments, and during various water-year types in accordance with subdivision (f). An urban water

City of Bakersfield 2-3
2025 Urban Water Management Plan
supplier may rely upon water supply information provided by the wholesale agency in fulfilling the plan informational requirements of subdivisions (b) and (f) (10631(h)).

Every urban water supplier required to prepare a plan pursuant to this part shall, at least 60 days before the public hearing on the plan required by section 10642, notify any city or county within which the supplier provides water supplies that the urban water supplier will be reviewing the plan and considering amendments or changes to the plan (10621(b)). ______________________________________________________________________________________ While the City’s Municipal Water System receives the majority of its water supply from the Kern River water rights of the City’s Wholesale System, the City’s Municipal Water System also receives a portion of its water supply from KCWA ID4 as a wholesale supplier. The City has coordinated the preparation of the Plan with KCWA’s ID4 as shown inTable 2-4 Retail.

Table 2-4 Retail: Water Supplier Information Exchange
Water Code Section 10631(h)
The retail supplier has informed the following wholesale supplier(s) of projected water use.

Wholesale Water Supplier Name
Kern County Water Agency ID4
NOTES:

The City’s Wholesale Water System provides Kern River surface water to Cal Water’s Northwest and Northeast Bakersfield Water Treatment Plants and provides Kern River water for groundwater replenishment for urban water demands within City limits. Table 2-4 Wholesale lists the retail water suppliers that were informed of water supply projections as a part of the UWMP development process.

Table 2-4 Wholesale: Water Supplier Information Exchange Water Code Section 10631(h)
Supplier has informed the following water suppliers of water supplies available in accordance with CWC 10631.

California Water Service Company
NOTES:

In addition to the water suppliers listed in Table 2-4 Retail and Table 2-4 Wholesale, the City coordinated the preparation of the Plan with the City of Bakersfield City Clerk, the Kern County Clerk, Kern County Planning Department, and the following water agencies that share a common source: Casa Loma Water Company, East Niles Community Services District, Greenfield County Water District, North of the River Municipal Water District, Oildale Mutual Water Company, Rosedale-Rio Bravo Water Storage District, and Vaughn Water Company. These agencies were provided notice that an update to the UWMP was being prepared at least 60 days prior to the public hearing and invited to participate in the update to the Plan.

Further information on coordination of the Plan and public involvement is included in Section 10. Copies of notices are included in Appendix A.

City of Bakersfield 3-1
2025 Urban Water Management Plan
Section 3: System Description

3.01 General Description
______________________________________________________________________________________ California Water Code
Describe the service area of the supplier (10631(a)).
______________________________________________________________________________________ The City of Bakersfield is located at the southern end of the San Joaquin Valley approximately 100 miles north of the City of Los Angeles. The City is the largest metropolitan area in Kern County and serves as the county seat. The Sierra Nevada mountains are located to the northeast of the City and the Tehachapi Mountains are located to the south.

The City of Bakersfield purchased Kern River assets, including a majority of its water rights, along with canals, land, and the physical water distribution systems for the Ashe Domestic Water Service Area from Tenneco West (Tenneco) on December 22, 1976. The Kern River water rights, canals, and land now comprise the City’s Wholesale Water System. The Ashe Domestic Water Service Area has been expanded over time and now functions as the City’s Municipal Water System.

The boundaries of the City’s Municipal Water System Service Area and the other retail water suppliers serving lands within the City limits are shown on Plate 1. The City’s Municipal Water System Service Area covers approximately 58.62 square miles in the westerly portion of the City limits, as shown on Plates 2 and 3, and provided water service to 51,559 connections in 2025. Service connections within the Municipal Water System are primarily residential with some commercial, light industrial, and public uses. Cal Water operates and maintains the City’s Municipal Water System under contract.

The City’s Wholesale Water System service area includes all lands within the City’s boundaries. The City’s Kern River water rights provide water supplies to the Wholesale Water System. These supplies are transported though the Kern River channel and canal systems for delivery to water treatment plants owned and operated by Cal Water and KCWA’s ID4 and to surface water recharge areas such as the City’s 2800 Acre recharge facility. The City’s surface water recharge operations with Kern River water are for the benefit of the retail water suppliers providing service to City area through their respective groundwater wells. The location of City wells, water treatment plants, and water facilities used for recharge of Kern River supplies within the Wholesale Water System service area are shown on Plate 4.

3.02 Service Area Climate
______________________________________________________________________________________ California Water Code
Describe the climate of the supplier (10631(a)).
______________________________________________________________________________________ The City is located in the southern San Joaquin Valley with elevations ranging from about 300 feet to about 800 feet. Precipitation mainly occurs during the months of October through April. Winter months are generally mild, with frequent fog occurring during December and January at times when cooler air is trapped in the valley by a high pressure system. Summer months are typically hot and dry. Table 3-0 presents the monthly average rates of evapo-transpiration (Eto), minimum and maximum temperatures, and precipitation within the service area.

City of Bakersfield 3-2
2025 Urban Water Management Plan
Table 3-0: Climate
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annua
l
Average
Monthly Eto(a)
(inches)

1.61 2.46 4.11 5.73 7.73 8.81 9.25 8.58 6.25 4.23 2.18 1.35 62.29 Average
Precipitation
(inches)(b)

1.19 1.18 1.15 0.60 0.25 0.05 0.00 0.00 0.05 0.28 0.51 1.10 6.36 Average Max
Temperature
(Fahrenheit)(b)

58.5 64.3 70.2 75.9 84.1 92.3 98.3 96.9 91.4 80.2 67.1 58.8 78.2 Average Min
Temperature
(Fahrenheit)(b)

40.5 43.2 47.0 50.7 58.0 65.1 71.3 70.0 65.0 55.2 45.4 39.6 54.3 Sources:
(a) Monthly Average Eto is for CIMIS Station 125 (Arvin-Edison). (b) National Weather Service, Bakersfield Area, Monthly Climate Normals 1991-2020, NOAA Online Weather Data.

3.03 Service Area Population and Demographics
______________________________________________________________________________________ California Water Code
Describe the service area of the supplier, including current and projected population . . .

The projected population estimates shall be based upon data from the state, regional, or local service agency population projections within the service area of the urban water supplier and shall be in five-year increments to 20 years or as far as data is available (10631(a)).

Describe the service area of the supplier, including . . . other social, economic and demographic factors affecting the supplier's water management planning (10631(a)). ______________________________________________________________________________________ Since data from the DWR’s Population Tool for census year 2020 was not available at the time of preparation of this UWMP, the 2025 population for the Municipal Water System Service Area was determined using an estimated population per household for the 2020-2024 period from the US Census website1 and the estimated number of households associated with the residential connections in the service area from Cal Water (developed as part of their 2025 eAR to the SWRCB-DDW).

The estimated 2025 population is therefore calculated as 3.14 persons per household multiplied by 54,493 households or about 171,100 persons. Population projections for the years 2030 through 2045 were calculated based on a population growth rate for the Metro Bakersfield Area of 1.4 percent per year per the 2022 Regional Transportation Plan (RTP) prepared by the Kern Council of Governments (Kern COG) 2. This is consistent with the growth rate in the City’s residential water service connections over the past 5 years.

See Table 3-1 Retail.

The population per household in the City has increased from about 2.77 persons per household in 2000 to 1 https://www.census.gov/quickfacts/fact/table/bakersfieldcitycalifornia/PST045224 accessed 6/18/2026. 2 2020-2046 Forecast Growth Average Annual Rate for Metro Bakersfield Population per Table 3-2: Growth Trends for Kern County and Selected Communities
City of Bakersfield 3-3
2025 Urban Water Management Plan

3.14 persons per household in 2020-2024 based on US Census estimates. Construction of Accessory Dwelling Units (ADUs) will likely continue this trend. ADUs represented about 9% of total single family residential building permits based on 2024-2025 building permit records from the City.

The State of California Department of Finance (DOF) prepares reports with population estimates for Cities and Counties on an annual basis. The DOF report was used for the 2025 population estimate for the wholesale service area, which is assumed to be the same as the City of Bakersfield City boundary.

Population projections for the years 2030 through 2045 were estimated using the same 1.4 percent annual growth rate as used for the Municipal Water System Service Area. See Table 3-1 Wholesale.

Table 3-1 Retail: Population - Current and Projected
Water Code Section 10631(a)
Population Served
2025 2030 2035 2040 2045
171,100 183,430 196,630 210,780 225,950
NOTES: 2025 population is estimated at 171,100 based on 3.14 persons per household (from US Census website for 2020-2024) multiplied by 54,493 households within the retail service area for 2025 as estimated by Cal Water. Projections for 2030 through 2045 based on a population growth rate of 1.4 percent per year per the Kern COG 2022 RTP.

Table 3-1 Wholesale: Population - Current and Projected Water Code Section 10631(a)
Population Served
2025 2030 2035 2040 2045
419,238 449,424 481,784 516,476 553,661
NOTES: 2025 Population from DOF Table E-5. Population projections for 2030 through 2045 based on a population growth rate of 1.4 percent per year per the Kern COG 2022 RTP.

There are a few Census Block Groups within the Municipal Water Service Area that qualify as Low-Moderate Income per the City of Bakersfield Planning Division. These areas are estimated to comprise approximately 3 percent of the City’s retail service area. The City is in the process of updating its General Plan, and the current Housing Element was adopted in September 2025. Data provided in the Housing Needs Assessment3 indicates that approximately 48 percent of the overall City population is identified as low or very low income. The City continues to have a relatively high number of persons per household as reflected in its population estimates.
3 Appendix B, Housing Needs Assessment, Table B-8 Income Distribution in Bakersfield City of Bakersfield 3-4
2025 Urban Water Management Plan

3.04 Land Uses within Service Area
______________________________________________________________________________________ California Water Code
The description shall include the current and projected land uses within the existing or anticipated service area affecting the supplier’s water management planning. Urban water suppliers shall coordinate with local or regional land use authorities to determine the most appropriate land use information, including, where appropriate, land use information obtained from local or regional land use authorities ... (10631(a)). ______________________________________________________________________________________ Land use is governed by the City for areas within its service area. As noted previously, the City is in the process of updating its General Plan. The City’s General Plan and Zoning Ordinances include land use goals, policies, and implementation measures for development. Proposed land uses within the City’s Municipal Water Service Area per the General Plan are similar to current land uses within the City. These primarily consist of residential uses with some commercial, light industrial, schools, and parks. It is assumed that the general mix of development types will continue through the planning horizon of this UWMP.

City of Bakersfield 4-1
2025 Urban Water Management Plan
Section 4: Water Use Characterization

4.01 Past, Current, and Projected Water Use
______________________________________________________________________________________ California Water Code
For an urban retail water supplier, quantify, to the extent records are available, past and current water use, and projected water use (over the same five-year increments described in subdivision (a)), identifying the uses among water use sectors, including, but not necessarily limited to, all of the following uses: (A) Single-family residential; (B) Multifamily; (C) Commercial; (D) Industrial; (E) Institutional and governmental; (F) Landscape; (G) Sales to other agencies; (H) Saline water intrusion barriers, groundwater recharge, or conjunctive use, or any combination thereof; (I) Agricultural (10631(d)(1) and (2)).

The water use projections required by Section 10631 shall include projected water use for single-family and multifamily residential housing needed for lower income households, as defined in Section 50079.5 of the Health and Safety Code, as identified in the housing element of any city, county, or city and county in the service area of the supplier (10631.1(a)).
______________________________________________________________________________________ Water uses within the Municipal Water service area for 2025 totaled 46,149 acre-feet. Past water use for the years 2021 through 2024 averaged about 43,949 acre-feet per year as shown in the City’s validated AWWA Water Audit worksheets (see Appendix G). Total water use per connection for 2020 was estimated at 252 gpcd in the 2020 UWMP and has reduced to about 241 gpcd for 2025.

The breakdown of 2025 water deliveries for the Municipal Water System service area by the water use types from the Water Code is provided in Table 4-1 Retail. Brief descriptions of the water use types within the City’s Municipal Water System service area and included inTable 4-1 Retail are provided below.  Single Family Residential One lot with one dwelling unit that may include a detached secondary dwelling.
 Multi-Family Residential Multiple dwelling units contained within one building or several buildings within one complex.
 Commercial Water users that provide or distribute a product or service.
 Industrial Water users that are primarily a manufacturer or processor of materials or engaged in research
and development.
 Institutional/Governmental Water users dedicated to public service including schools, courts, churches, hospitals,
parks, and other government facilities.
 Construction Water Purchases of water by contractors for use in construction operations.
 Other (losses) Includes distribution system losses and other non-revenue water. Calculated as the difference
between water supplies and metered deliveries.

City of Bakersfield 4-2
2025 Urban Water Management Plan
Table 4-1 Retail: Total Uses for Potable and Non-Potable Water – Actual Water Code Section 10631(d)(1)
Use Type
2025 Actual Water Use1
Additional Description Potable or Non-
Potable Volume (AF)
Single Family Residential Potable 28,169
Multi-Family Residential Potable 1,301
Commercial Potable 6,981
Industrial Potable 214
Institutional/Governmental Public Facilities Potable 3,210 Other Construction Water Potable 342
Other (Losses)2 Potable 5,932
TOTAL 46,149
NOTES:

1. Does not include recycled water use.

2. The amount shown as other (losses) includes non-revenue water such as backwash, operational flushing, and fire department usage. It is calculated as the difference between water supplied to the system and metered deliveries.

The Wholesale Water System delivers Kern River water to surface water treatment plants for immediate use by the retail water systems. In addition, Kern River deliveries are also made to groundwater recharge facilities and recharged Kern River supplies are stored in the groundwater basin for future use. These supplies are pumped by the overlying retail water suppliers for use within their respective service areas.

Deliveries of water during 2025 from the Wholesale Water System to retail water suppliers and for groundwater replenishment are summarized in Table 4-1 Wholesale.

Table 4-1 Wholesale: Total Uses for Potable and Non-Potable Water – Actual Water Code Section 10631(d)(1)
Use Type
2025 Actual Water Use
Additional Description Potable or Non-
Potable
Volume
(AF)
Sales to other agencies Cal Water Northeast Treatment Plant Non-Potable 5,905 Sales to other agencies Cal Water Northwest Treatment Plant Non-Potable 3,061 Other Potable KCWA ID4 Henry C. Garnett Water
Purification Plant Non-Potable 0
Groundwater recharge River and Carrier Canal Recharge, 2800 Acre Banking, and other City Facilities Non-Potable 47,438 TOTAL 56,404
NOTES:

City of Bakersfield 4-3
2025 Urban Water Management Plan
The “Making Conservation a California Way of Life” regulation went into effect on January 1, 2025 which provides methodology whereby urban water use objectives (UWUOs) are calculated for each urban water supplier based on residential water use criteria (both indoor and outdoor), Commercial, Institutional, and Industrial (CII) performance measures including dedicated irrigation metering, and water system real losses.

The continued implementation of demand management measures to meet these UWUOs will result in decreasing per capita water use in the future. Estimates prepared by SWRCB staff indicate that the City’s water use would exceed its UWUO by approximately 39% in 2040 based on current indoor and outdoor water usage data. The breakdown of water deliveries to the various water use types in 2025 was found to be similar to that in 2020.

Future total residential water use is estimated based on the projected population data from Table 3-1 Retail and assumes compliance with UWUOs would result in a 2 percent annual reduction in future per capita residential water use from 2025 through 2040. Future water use for other than single family residential connections is projected to increase based on the 1.4% annual growth factor. Single-family residential water use is then calculated as the estimated total residential water use less the projected multi-family residential water use. Other water use and losses are estimated at 8% of total water use, which covers system losses as well as non-revenue water used for backwash, operational flushing, and fire department usage.

Table 4-2 Retail includes projections of the City’s Municipal Water Service Area water use for the years 2030 through 2045 in five-year increments.

Table 4-2 Retail: Total Uses for Potable and Non-Potable Water - Projected Water Code Section 10631(d)(1)
Use Type Additional Description
(as needed)
Projected Water Use
2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF)
Single Family2 27,084 26,091 25,119 26,927
Multi-Family1 1,475 1,581 1,695 1,817
Commercial1 7,912 8,481 9,092 9,746
Industrial1 3,638 3,900 4,181 4,482
Institutional/Governmental1 Public Facilities 244 261 280 300 Other1 Construction Water 387 415 445 477
Other (Losses)3 Estimated at 8% of total 3,468 3,714 3,560 3,806 TOTAL 44,208 44,443 44,372 47,555
NOTES:

1. Estimated as 2025 water use increased by 1.4% annual growth factor.

2. Calculated as estimated residential per capita water usage (assuming a 2% annual reduction from 2025 through 2040) multiplied by population projections from Table 3.1 less estimated multi-family water use.

3. The amount shown as other (losses) includes non-revenue water such as backwash, operational flushing, and fire department usage. Calculated as 8% of total water deliveries.

Water use projections for the City’s Wholesale Water Service for the years 2030 through 2045 area are provided in Table 4-2 Wholesale. Deliveries to Cal Water treatment plants are based on projections from Cal Water. Projected deliveries to KCWA ID4 treatment plant and for groundwater replenishment are provided by City Water Department staff. Actual deliveries in any year will depend on the Kern River water conditions and the City’s contractual Kern River obligations.

City of Bakersfield 4-4
2025 Urban Water Management Plan
Table 4-2 Wholesale: Total Uses for Potable and Non-Potable Water - Projected Water Code Section 10631(d)(1)
Use Type Additional Description
Projected Water Use
2030
(AF)
2035
(AF)
2040
(AF)
2045
(AF)
Sales to other
agencies Cal Water Northeast Treatment Plant1 11,400 11,400 11,400 11,400 Sales to other
agencies Cal Water Northwest Treatment Plant1 6,000 6,000 6,000 6,000 Other KCWA ID4 Henry C. Garnett Water
Purification Plant 6,500 6,500 6,500 6,500
Groundwater
recharge
River and Carrier Canal Recharge, 2800
Acre Banking, and other City Facilities 76,100 76,100 76,100 76,100 TOTAL 100,000 100,000 100,000 100,000
NOTES: 1. Based on Cal Water projections.

4.02 Future Water Savings and Water Use for Lower Income Households ______________________________________________________________________________________ California Water Code
Water use projections, where available, shall display and account for the water savings estimated to result from adopted codes, standards, ordinances, or transportation and land use plans identified by the urban water supplier, as applicable to the service area.. . . Water use projections that do not account for these water savings shall be noted of that fact (10631 (d)(4)(A,B)).

The water use projections required by Section 10631 shall include projected water use for single-family and multifamily residential housing needed for lower income households, as defined in Section 50079.5 of the Health and Safety Code, as identified in the housing element of any city, county, or city and county in the service area of the supplier (10631.1(a)).
______________________________________________________________________________________ The water use projections for the City’s Municipal Water Service Area are adjusted to account for the assumed decrease in future water use related to compliance with UWUOs established under the “Making Conservation a California Way of Life” regulation (see Section 4.01). Lower income water use is included in the water use projections for the City’s Municipal Water Service Area and are estimated to comprise approximately 3 percent of the City’s retail service area water use. SeeTable 4-3 Retail. Submittal Table 4-4 Retail does not apply to the City’s Municipal Water System and is not included in this UWMP.

Table 4-3 Retail: Inclusion in Water Use Projections
Water Code Section 10631 (a), 10631 (d)(4)(A), and 10631 (d)(4)(B) Are Future Water Savings Included in Projections? Yes
Are Lower Income Residential Demands Included In Projections? Yes NOTES: Future water use projections assume a decrease in residential per capita water use due to compliance with UWUOs established under the “Making Conservation a California Way of Life” regulation. See Section 4.01.

City of Bakersfield 4-5
2025 Urban Water Management Plan

4.03 Distribution System Water Losses
______________________________________________________________________________________ California Water Code
For an urban retail water supplier, quantify, to the extent records are available, past and current water use, and projected water use (over the same five-year increments described in subdivision (a)), identifying the uses among water use sectors, including, but not necessarily limited to, all of the following uses:. . . (J) Distribution system water loss. (10631(d)(1) and (2)).

The distribution system water loss shall be quantified for each of the five years preceding the plan update in accordance with rules adopted pursuant to Section 10608.34.

The distribution system water loss quantification shall be reported in accordance with a worksheet approved or developed by the department through a public process. The water loss quantification worksheet shall be based on the water system balance methodology developed by the American Water Works Association.

In the plan due July 1, 2021, and in each update thereafter, data shall be included to show whether the urban retail water supplier met the distribution loss standards enacted by the board pursuant to Section 10608.34 (10631(d)(3)).
______________________________________________________________________________________ Table 4-5 Retail presents the reporting status for the City’s Municipal Water System water loss audits for the years 2020 through 2024. Copies of the validated water system audits are provided in Appendix G. Water loss audit reporting is not required for the Wholesale Water Service Area. Therefore, Table 4-5 is not provided for the wholesale system.

Table 4-5 Retail: Water Loss Audit Reporting
Water Code Section 10631(d)(3)(A)
Public Water System ID #
Reported in Table 2-1 R
Reporting
Period
Submitted to DWR
Water Loss Audit
Program (yes/no)
CA1510031
2020 Yes
2021 Yes
2022 Yes
2023 Yes
2024 Yes
NOTES: See Appendix G for copies of Water Loss Audits.

Progress of the City’s Municipal Water System towards meeting the distribution system water loss standards enacted by the Water Board are shown on Table 4-6 Retail. The State Water Board Standard for 2028 Real Water Loss is provided in units of Gallons per Service Connection per Day (GPSCD). Compliance with the water loss standards is required by January 1, 2028.

The City is working to improve the accuracy of its metering equipment and the quality of data used to calculate losses. This requires cooperation with Cal Water, which operates and maintains the Municipal Water System under contract. As described in Section 9, water production and consumption are monitored to identify possible areas of leakage. Customer billing records are monitored for unusually high water use. A leak detection and repair program is implemented through Cal Water with repairs made as needed.

City of Bakersfield 4-6
2025 Urban Water Management Plan
Table 4-6 Retail: Progress Towards 2028 Water Loss Standard Water Code Section 10631(d)(3)(C)
2028 Real Water
Loss Standard
(GPSCD)
Real Water Loss
Per 2024 Water
Loss Audit
(GPSCD)
2028 Apparent
Water Loss
Standard
(GPSCD)
Apparent Water
Loss 2024 Water
Loss Audit
(GPSCD)

14.0 42.5 19.6 17.9
NOTES: Water loss data in gallons per service connection per day (GPSCD).

4.04 Climate Change Considerations
______________________________________________________________________________________ California Water Code
It is the intention of the Legislature, in enacting this part, to permit levels of water management planning … while accounting for impacts of climate change (10630). ______________________________________________________________________________________ Climate Change impacts were modeled for the Kern County Subbasin Groundwater Sustainability Plan (KCSGSP). Considerations included increases in water demands using DWR climate change factors and guidance. DWR climate change guidance referenced in the KCSGSP indicates that a change in timing of Kern River flows is anticipated, with more flows in the winter and early spring and less in the summer.

However, the total Kern River flow volume is not expected to change significantly. Section 9.6 Projected Future Subbasin Water Budget from the KCSGSP is included as Appendix C.

The Kern River is the primary water source for the City of Bakersfield. The City’s water use projections are expected to adequately consider climate change impacts during the period covered by this UWMP.

City of Bakersfield 5-1
2025 Urban Water Management Plan
Section 5: SB X7-7 Baselines, 2020 Targets, and
2025 Reporting
____________________________________________________________________________________ California Water Code
Urban water retail suppliers shall report to the department on their progress in meeting their urban water use targets as part of their urban water management plans submitted pursuant to Section 10631 (10608.12).

Urban wholesale water suppliers shall include in the urban water management plans required pursuant to Part 2.6 (commencing with Section 10610) an assessment of their present and proposed future measures, programs, and policies to help achieve the water use reductions required by this part (10608.36).
______________________________________________________________________________________ The City’s Municipal Water System achieved compliance with its 2020 per capita water use target as noted in its 2020 UWMP and shown in Table 5-1.

Table 5-1 Retail: SB X7-7 2020 Target Progress
Water Code Section 10608.40
Was Supplier part
of a merger or
consolidation since
2020?
Regional
Alliance Target
or Individual
Target?
2020 Target Actual 2020
GPCD
Did Supplier
Achieve Targeted
Reduction for
2020?
No Individual
Target 253 252 Yes
NOTES: Per City of Bakersfield 2020 UWMP
The measures, programs, and policies implemented by the Wholesale Water System to help the retail suppliers within the wholesale service area to achieve compliance are described in Chapter 9.

City of Bakersfield 6-1
2025 Urban Water Management Plan
Section 6: Water Supply Characterization
______________________________________________________________________________________ California Water Code
Identify and quantify, to the extent practicable, the existing and planned sources of water available to the supplier over the same five-year increments described in subdivision (a), providing supporting and related information including all of the following:
(1) A detailed discussion of anticipated supply availability under a normal year, single dry year, and droughts lasting at least five years, as well as more frequent and severe periods of drought, as described in the drought risk assessment. For each source of supply, consider any information pertinent to the reliability analysis conducted pursuant to Section 10635, including changes in supply due to climate change. (10631 (b)) ______________________________________________________________________________________ The City’s Municipal Water System utilizes groundwater supplies and treated surface water. Surface water from the Kern River is the source for the Wholesale Water System. Details on the City’s various water supply sources are provided below.

6.01 Purchased or Imported Water
The City’s surface water supplies are described inSection 6.03. The City does not use other purchased or imported water supplies.

6.02 Groundwater
______________________________________________________________________________________ California Water Code
If groundwater is identified as an existing or planned source of water available to the supplier, all of the following information:
(A) The current version of any groundwater sustainability plan or alternative adopted pursuant to Part 2.74 (commencing with Section 10720), any groundwater management plan adopted by the urban water supplier, including plans adopted pursuant to Part 2.75 (commencing with Section 10750), or any other specific authorization for groundwater management for basins underlying the urban water supplier’s service area. (B) A description of any groundwater basin or basins from which the urban water supplier pumps groundwater.
(C) For basins that a court or the board has adjudicated the rights to pump groundwater, a copy of the order or decree adopted by the court or the board and a description of the amount of groundwater the urban water supplier has the legal right to pump under the order or decree. For a basin that has not been adjudicated, information as to whether the department has identified the basin as a high- or medium-priority basin in the most current official departmental bulletin that characterizes the condition of the groundwater basin, and a detailed description of the efforts being undertaken by the urban water supplier to coordinate with groundwater sustainability agencies or groundwater management agencies listed in subdivision (c) of Section 10723 to maintain or achieve City of Bakersfield 6-2
2025 Urban Water Management Plan
sustainable groundwater conditions in accordance with a groundwater sustainability plan or alternative adopted pursuant to Part 2.74 (commencing with Section 10720). (D) A detailed description and analysis of the location, amount, and sufficiency of groundwater pumped by the urban water supplier for the past five years. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records. (10631(b)(4))
______________________________________________________________________________________ The City pumps groundwater and recharged surface water from the Kern County Subbasin of the San Joaquin Valley Groundwater Basin (Groundwater Basin No. 5-22.14) which is currently non-adjudicated. The Kern County Subbasin is designated as critically overdrafted and identified as a high-priority basin in the latest version of Bulletin 118 published by the DWR. The City is a member of the Kern River Groundwater Sustainability Agency (KRGSA) which covers approximately 361 square miles overlying the Kern County Subbasin. Other member agencies include the Kern Delta Water District and KCWA’s ID4. The KRGSA was formed in compliance with the Sustainable Groundwater Management Act (SGMA) to cooperatively manage local groundwater in a sustainable manner.

In response to deficiencies identified in the GSPs initially submitted to DWR, primary regulatory oversight of the Kern County Subbasin was temporarily shifted to the State Water Board in March 2023. The KRGSA subsequently became a participant in the Kern County Subbasin Groundwater Sustainability Plan (KCSGSP), with the intent to coordinate groundwater management throughout the entire 2,800 square mile Subbasin. An Amended KCSGSP was adopted in August 2025 and submitted to the State Water Board and DWR for review. State Water Board staff completed review of the adopted KCSGSP and returned the Kern County Subbasin to the DWR’s jurisdiction in December 2025.

The KCSGSP includes management actions and proposes projects to maintain the groundwater resource in a sustainable condition under future climate change conditions through the year 2070. As a result of the ongoing management of the groundwater basin, the City’s groundwater and recharged surface water supplies are anticipated to be sufficient to meet its demands for the next 50 years and beyond. The City’s groundwater operations are subject to conformance with the requirements of the KCSGSP.

Kern River water supplies are recharged to the groundwater basin by the Wholesale Water System for the benefit of retail water suppliers throughout the City, including the City’s Municipal Water System. Historic groundwater and recharged surface water pumping volumes within the Municipal Water System service area for the years 2021 through 2025 are provided in Table 6-1 Retail. The Wholesale Water System does not pump groundwater. Therefore, Table 6-1 Wholesale does not apply and is not included in this UWMP.

Table 6-1 Retail: Groundwater Volume Pumped
Water Code Section 10631(4) and 10631(4)(c)
Groundwater
Type
Location or Basin
Name 2021 (AF) 2022 (AF) 2023 (AF) 2024 (AF) 2025 (AF)
Alluvial Basin Kern County Subbasin 42,246 35,192 32,799 36,304 38,335 TOTAL 42,246 35,192 32,799 36,304 38,335
NOTES:

The Municipal Water System has sufficient redundancy to allow for wells and other facilities to be taken offline as needed for maintenance or repairs. The City has installed standby generators at its well facilities so that it can continue to provide water supply in the event of an electrical power outage. Wellhead groundwater treatment facilities have been installed where necessary in order to continue providing water supplies that meet current potable water standards.

City of Bakersfield 6-3
2025 Urban Water Management Plan

6.03 Surface Water
The Municipal Water System receives treated surface water supplies from Cal Water’s North Garden (Northwest) Treatment Plant and Kern County Water Agency ID4’s Henry C. Garnett Water Purification Plant. The Wholesale Water System provides Kern River supplies to the Cal Water Northwest and Northeast Treatment Plant. The Henry C. Garnett Water Purification Plant treats SWP supplies. When SWP supplies are not available from KCWA’s ID4, the City is able to deliver its Kern River supplies to KCWA’s ID4 for treatment in place of SWP supplies.

The Wholesale Water System provides groundwater recharge of Kern River water supplies both by transportation through the Kern River and unlined portions of City canals, including the Carrier Canal, and within groundwater replenishment areas such as the City’s 2800 Acres recharge facility, Truxtun Lakes, Aera Park, and the Park at Riverwalk. The Environmental Impact Report (EIR) for the Kern River Flow and Municipal Water Program estimated the City’s Kern River water supplies for both urban use and agricultural use to average about 135,000 acre-feet per year (see Appendix D). Approximately 100,000 acre-feet of the 135,000 acre-feet is designated for urban use The City has storage rights in Lake Isabella that allows for flexibility in the management of its Kern River supplies.

6.04 Stormwater
The City maintains almost 400 stormwater basins that capture precipitation and recharge the groundwater basin. As noted in the City’s 2020 UWMP, these stormwater basins are estimated to capture and recharge approximately 16,000 acre-feet per year of stormwater runoff on average, and approximately 4,272 acre-feet per year of additional stormwater runoff is estimated to be captured and diverted into the Kern River and unlined canals on an average annual basis. This captured stormwater becomes part of the City’s groundwater and recharged water supplies as described in Section 6.02.

6.05 Wastewater and Recycled Water
______________________________________________________________________________________ California Water Code
The plan shall provide, to the extent available, information on recycled water and its potential for use as a water source in the service area of the urban water supplier. The preparation of the plan shall be coordinated with local water, wastewater, groundwater, and planning agencies that operate within the supplier’s service area, and shall include the following:
a) A description of the wastewater collection and treatment systems in the supplier’s service area, including a quantification of the amount of wastewater collected and treated and the methods of wastewater disposal.
b) A description of the quantity of treated wastewater that meets recycled water standards, is being discharged, and is otherwise available for use in a recycled water project. c) A description of the recycled water currently being used in the supplier’s service area, including, but not limited to, the type, place, and quantity of use. d) A description and quantification of the potential uses of recycled water, including, but not limited to, agricultural irrigation, landscape irrigation, wildlife habitat enhancement, wetlands, industrial reuse, groundwater recharge, indirect potable reuse, and other appropriate uses, and a determination with regard to the technical and economic feasibility of serving those uses.

City of Bakersfield 6-4
2025 Urban Water Management Plan
e) The projected use of recycled water within the supplier’s service area at the end of 5, 10, 15, and 20 years, and a description of the actual use of recycled water in comparison to uses previously projected pursuant to this subdivision. f) A description of actions, including financial incentives, which may be taken to encourage the use of recycled water, and the projected results of these actions in terms of acre-feet of recycled water used per year.
g) A plan for optimizing the use of recycled water in the supplier’s service area, including actions to facilitate the installation of dual distribution systems, to promote recirculating uses, to facilitate the increased use of treated wastewater that meets recycled water standards, and to overcome any obstacles to achieving that increased use. (16033) ______________________________________________________________________________________ Wastewater generated within the Municipal Water System service area is collected and transported to the City’s WWTP No. 3, located within the Municipal Water System service area, which provides undisinfected secondary and tertiary treatment. Undisinfected secondary effluent is stored in percolation ponds and used for agricultural irrigation. Tertiary treated effluent is used for landscape irrigation on City owned property adjacent to the treatment plant. Wastewater treatment and disposal is not applicable to the Wholesale Water System.

WWTP No. 3 serves areas located both within and outside of the Municipal Water System service area. The wastewater volume generated within the Municipal Water System service area during 2025 is estimated at 30% of the total water demand per Table 4-1 Retail. Wastewater collected from within the Municipal Water System service area in 2025 is summarized in Table 6-2 Retail.

Table 6-2 Retail: Wastewater Collected Within Service Area Water Code Section 10633(a)
Wastewater Collection Recipient of Collected Wastewater Name of Wastewater
Collection Agency
Wastewater
Volume
Metered or
Estimated?
Volume of
Wastewater Collected
from UWMP Service
Area in 2025 (AF)1
Name of Wastewater
Treatment Plant (WWTP)
and Place ID Number
Is WWTP
Located
Within
UWMP
Area?
City of Bakersfield Estimated 13,845 Bakersfield WWTP No. 3 Place ID 273209 Yes
Total Wastewater Received from
UWMP Service Area in 20251: 13,845
NOTES:

1. Volume of wastewater generated within the Municipal Water System service area is estimated as 30% of the total 2025 water use of 46,149 acre-feet per Table 4-1 Retail.

A summary of the total wastewater treated at and discharged from WWTP No. 3 for 2025, including wastewater generated both within and outside of the Municipal Water System service area, is provided in Table 6-3 Retail.

Approximately 7,801 acre-feet of undisinfected secondary effluent was delivered in 2025 for agricultural irrigation use outside of the service area on property owned by the City of Los Angeles. Approximately 14,863 acre-feet of undisinfected secondary effluent was disposed of in percolation ponds at the WWTP.

Approximately 752 acre-feet of tertiary treated effluent was delivered as recycled water for irrigation of landscaping within the Kaiser Permanente Sports Village, a City owned soccer and football complex located within the Municipal Water System service area.

City of Bakersfield 6-5
2025 Urban Water Management Plan
The Wholesale Water System neither distributes nor provides supplemental treatment to recycled water.

Therefore, Table 6-3 Wholesale does not apply and is not included in this UWMP.

Table 6-3 Retail: Wastewater Treatment and Outcomes Within UWMP Service Area 2025 Water Code Section 10633(b)
Wastewater
Treatment Plant
Name and Place ID
Number
2025
Volume of
Wastewater
from UWMP
Service Area
(AF)
Total 2025
Volume of
Water
Treated
(AF)
2025 Outcomes of Treated Wastewater
Water Recycled Within
UWMP Service Area
Water Recycled Outside
of UWMP Service Area
Treatment
Level
Volume
(AF)
Treatment
Level
Volume
(AF)
Bakersfield WWTP #3
Place ID 273209 13,845 23,416
Secondary,
Undisinfected 14,863 Secondary,
Undisinfected 7,801
Tertiary 752
Total 15,615 7,801
NOTES: Undisinfected secondary effluent from WWTP #3 is disposed of in percolation ponds at the WWTP site and by agricultural irrigation outside of the UWMP service area.

On July 17, 2019, the City Council voted not to renew its contract for sale of wastewater for agricultural irrigation use on the farmland owned by the City of Los Angeles when it expires in 2026. This may allow for additional recycled water to be used within the Municipal Water System service area in the future.

Current and projected use of recycled water is summarized in Table 6-4 Retail. The comparison of 2025 actual recycled water use to that projected in the 2020 UWMP is included in Table 6-5 Retail. Potential projects to expand recycled water use are summarized in Table 6-6 Retail. Table 6-4 Wholesale and Table 6-5 Wholesale do not apply and are not included in this UWMP.

Table 6-4 Retail: Recycled Water Direct Beneficial Uses Within Service Area Water Code Section 10633 (c),(d),(e)
Name of Facility Producing (Treating) the
Recycled Water: City of Bakersfield WWTP #3
Name of Supplier Operating the Recycled
Water Distribution System City of Bakersfield
Beneficial Use Type Potable or Non-
Potable
2025
(AF)
2030
(AF)
2035
(AF)
2040
(AF)
2045
(AF)
Landscape Irrigation Non-Potable 752 2,240 2,240 8,961 8,961 Total: 752 2,240 2,240 8,961 8,961
NOTES: Assumes expansion of the tertiary treatment facility in 2040.

City of Bakersfield 6-6
2025 Urban Water Management Plan
Table 6-5 Retail: 2020 UWMP Recycled Water Use Projection Compared to 2025 Actual Water Code Section 10633(e)
Direct Use 2020 Projection for 2025
(AF)
2025 actual use1
(AF)
Landscape irrigation at Sports Village 2,240 752
Total 2,240 752
NOTES: 1. Planned expansion of tertiary treatment capacity at WWTP 3 and increase in landscape irrigation at the Sports Village complex did not occur.

Table 6-6 Retail: Methods to Encourage Future Recycled Water Use Water Code Section 10633(f)
Name of Action/Description Planned
Implementation Year
Expected Increase in
Recycled Water Use
Expansion of Tertiary Treatment
at WWTP No. 3 2040 8,209 AF/yr
Total 8,209 AF/yr
NOTES: Expected increase in recycled water use is the difference between projected 2040 use and actual 2025 use.

6.06 Desalinated Water Opportunities
______________________________________________________________________________________ California Water Code
Describe the opportunities for development of desalinated water, including but not limited to ocean water, brackish water, and groundwater, as a long-term supply. (10631(g)) ______________________________________________________________________________________ The City has no plans for the development of desalinated water supplies within the planning horizon of this UWMP. The City is not located near sources of ocean water or brackish groundwater. Desalination is not a feasible solution for its water supply needs.

6.07 Exchanges and Transfers
______________________________________________________________________________________ California Water Code
Describe the opportunities for exchanges or transfers of water on a short-term or long- term basis. (10631(c))
______________________________________________________________________________________ The Municipal Water System and the Wholesale Water System does not typically or routinely participate in short-term or long-term water exchanges or transfer programs. Such programs have historically been utilized only during exceptionally dry hydrologic conditions when necessary to supplement water supply or support system operations
City of Bakersfield 6-7
2025 Urban Water Management Plan

6.08 Supply from Storage
The Municipal Water System and the Wholesale Water System are supplied by a combination of direct diversions from the Kern River and releases from upstream storage, depending on hydrologic and operational conditions.

6.09 Other
The Municipal Water System and the Wholesale Water System do not have other sources of supply.

6.10 Future Water Projects
______________________________________________________________________________________ California Water Code
Include a description of all water supply projects and water supply programs that may be undertaken by the urban water supplier to meet the total projected water use, as established pursuant to subdivision (a) of Section 10635. The urban water supplier shall include a detailed description of expected future projects and programs that the urban water supplier may implement to increase the amount of the water supply available to the urban water supplier in normal and single dry water years and for a period of drought lasting five consecutive water years. The description shall identify specific projects and include a description of the increase in water supply that is expected to be available from each project. The description shall include an estimate with regard to the implementation timeline for each project or program (10631(f)). ______________________________________________________________________________________

6.10.1 Expand Recycled Water Use
As discussed in Section 6.05, the City Council voted to not renew its contract for wastewater supply for agricultural irrigation use on the farmland owned by the City of Los Angeles when it expires in 2026. This may allow for additional recycled water to be used within the Municipal Water System service area in the future.

Table 6-7 Retail: Expected Future Water Supply Projects or Programs Water Code Section 10631(f)
Name of Future
Projects or Programs
Joint Project
with other
agencies?
Description
(if needed)
Planned
Implementation
Year
Planned
for Use in
Year Type
Expected
Increase in
Water Supply to
Agency (AF)
WWTP No. 3 Tertiary
Treatment Expansion No
Expand tertiary
treatment from
2 MGD to 8 MGD
2040 All year
types 8,209
NOTES: Expected increase from 2025 average use.

City of Bakersfield 6-8
2025 Urban Water Management Plan

6.11 Summary of Existing and Planned Sources of Water
______________________________________________________________________________________ California Water Code
Identify and quantify, to the extent practicable, the existing and planned sources of water available to the supplier over the same five-year increments described in subdivision (a), providing supporting and related information, including all of the following… (2) When multiple sources of water supply are identified, a description of the management of each supply in correlation with the other identified supplies. (10631 (b)) A detailed description and analysis of the amount, and location of groundwater that is projected to be pumped by the urban water supplier. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records (10631(b)(4)(E)).
______________________________________________________________________________________ The Municipal Water System service area relies significantly on pumped groundwater and recharged surface water supplies to meet its demands. The City’s groundwater and recharged surface water supplies are expected to be sustainable and available to meet the projected demands of its service area for the next 50 years and beyond, especially with the reduction in demands anticipated due to compliance with UWUOs.

The City’s proposed expansion of its recycled water use will provide additional water supplies for the benefit of the groundwater basin. Purchases of treated surface water supplies from Cal Water Northwest Treatment Plant (treated Kern River supplies) and Henry C. Garnett Water Purification Plant (treated SWP supplies from KCWA ID4) are anticipated to be available to meet demands as projected in this Plan. When SWP supplies are not available from KCWA’s ID4, the City can deliver Kern River supplies to KCWA’s ID4 for treatment in place of SWP supplies.

Actual supplies for 2025 for the Municipal Water System service area are summarized in Tables 6-8 Retail.

Projections for water supplies are provided in Table 6-9 Retail. Projections of groundwater and recharged water pumping are estimated as the difference between the projected demands from Table 4-2 Retail and estimated purchases of treated surface water supplies.

Table 6-8 Retail: Water Supplies — Actual
Water Code Section 10631(b)
Water Supply Source Additional Detail on
Water Supply
2025
Potable or
Non-Potable
Actual Volume
(AF)
Groundwater (not desalinated) City Wells Potable 38,335 Surface Water (not desalinated) Cal Water Northwest
Treatment Plant Potable 1,341
Surface Water (not desalinated) Henry C. Garnett Water
Purification Plant Potable 6,473
Recycled Water WWTP No. 3 Tertiary Non-Potable 752
Subtotal Potable 46,149
Subtotal Non-Potable 752
Total 46,901
NOTES:

City of Bakersfield 6-9
2025 Urban Water Management Plan
Table 6-9 Retail: Water Supplies — Projected
Water Code Section 10631 (b)
Water Supply Source Additional Detail on
Water Supply
Projected Water Supply
Reasonably Available Volume
2030
(AF)
2035
(AF)
2040
(AF)
2045
(AF)
Groundwater (not desalinated) City Wells 33,208 33,443 33,372 36,555 Surface Water (not desalinated) Cal Water Northwest
Treatment Plant 4,500 4,500 4,500 4,500
Surface Water (not desalinated) Henry C. Garnett Water
Purification Plant 6,500 6,500 6,500 6,500
Recycled Water WWTP No. 3 Tertiary 2,240 2,240 8,961 8,961 Total 46,448 46,683 53,333 56,516
NOTES:

Actual Kern River deliveries to the Wholesale Water System in 2025 are provided in Table 6-8 Wholesale.

The projections of available Kern River water supplies for the Wholesale Water System shown in Table 6-9 Wholesale are based on the average historic City water yield per the EIR for the Kern River Flow and Municipal Water Program (see Appendix D) less agricultural deliveries and evaporation losses. The City’s Kern River deliveries are replenished to the groundwater basin for the benefit of retail water suppliers providing service to City areas through their respective groundwater wells.

Table 6-8 Wholesale: Water Supplies — Actual
Water Code Section 10631(b)
Water Supply Source Additional Detail on
Water Supply
2025
Actual Volume
(AF)
Potable or Non-
Potable
Surface Water (not desalinated) Kern River Supply 56,404 Non-Potable Total 56,404
NOTES:

Table 6-9 Wholesale: Water Supplies — Projected
Water Code Section 10631 (b)
Water Supply Source Additional Detail on
Water Supply
Projected Water Supply
Reasonably Available Volume
2030
(AF)
2035
(AF)
2040
(AF)
2045
(AF)
Surface Water (not desalinated) Kern River Supply 100,000 100,000 100,000 100,000 Total 100,000 100,000 100,000 100,000
NOTES:

City of Bakersfield 6-10
2025 Urban Water Management Plan

6.12 Energy Use
______________________________________________________________________________________ California Water Code
In addition to the requirements of Section 10631, an urban water management plan shall include any of the following information that the urban water supplier can readily obtain:
(1) An estimate of the amount of energy used to extract or divert water supplies. (2) An estimate of the amount of energy used to convey water supplies to the water treatment plants or distribution systems.
(3) An estimate of the amount of energy used to treat water supplies. (4) An estimate of the amount of energy used to distribute water supplies through its distribution systems.
(5) An estimate of the amount of energy used for treated water supplies in comparison to the amount used for nontreated water supplies.
(6) An estimate of the amount of energy used to place water into or withdraw from storage. (7) Any other energy-related information the urban water supplier deems appropriate (10631.2(a)).
______________________________________________________________________________________ The estimated energy used to extract, divert, convey, treat, and distribute water for the City’s Municipal Water System was determined from the energy utility invoices received during 2025 for its various water system facilities. The City does not use significant amounts of self-generated energy in its Municipal Water System. Energy is used primarily for groundwater wells and booster pumps. Data is not readily available to provide separate estimates of the amount of energy used for each component of the City’s Municipal Water System operations or to determine the amount used for treated water supplies in comparison to the amount used for nontreated water supplies.

The Municipal Water System’s estimated energy intensity for 2025 is calculated based on the Total Utility Approach as described in Appendix O of the Guidebook and shown in Table O-1B. The estimated energy use of 19,244,230 kilowatt-hours (kWh) for 2025 does not include recycled and wastewater related energy use. Therefore, the volume of water entering the process is the total municipal water use of 46,149 AF from Table 4-1 Retail.

Table O-1B: Recommended Energy Reporting
Single Delivery Product - Total Utility Approach
Reporting Period 2025
Urban Water Supplier Operational Control
Sum of All Water Management Processes
Total Utility
Volume of Water Entering Process (AF) 46,149
Energy Consumed (kWh) 19,244,230
Energy Intensity (kWh/vol. converted to MG) 1,280
City of Bakersfield 7-1
2025 Urban Water Management Plan
Section 7: Water Service Reliability and Drought
Risk Assessment

7.01 Water Service Reliability Assessment
______________________________________________________________________________________ California Water Code
Every urban water supplier shall include, as part of its urban water management plan, an assessment of the reliability of its water service to its customers during normal, dry, and multiple dry water years. This water supply and demand assessment shall compare the total water supply sources available to the water supplier with the long-term total projected water use over the next 20 years, in five-year increments, for a normal water year, a single dry water year, and a drought lasting five consecutive water years. The water service reliability assessment shall be based upon the information compiled pursuant to Section 10631, including available data from state, regional, or local agency population projections within the service area of the urban water supplier (10635(a)).

A detailed discussion of anticipated supply availability under a normal water year, single dry year, and droughts lasting at least five years, as well as more frequent and severe periods of drought, as described in the drought risk assessment. For each source of water supply, consider any information pertinent to the reliability analysis conducted pursuant to Section 10635, including changes in supply due to climate change (10631(b)(1)).
______________________________________________________________________________________ The City anticipates that its sources of supplies will be available to meet demands on a consistent basis for all year types throughout the planning horizon of this UWMP. The City’s Wholesale Water System replenishes its Kern River supplies to the groundwater basin for the benefit of retail water suppliers providing service to City areas through their respective groundwater wells. The KCSGSP includes management actions and proposes projects to maintain the groundwater resource in a sustainable condition under future climate change conditions through the year 2070. The City and other retail water suppliers within the Wholesale Water System service area are able to increase use of their groundwater wells during years of reduced Kern River supplies.

The Municipal Water System service area relies significantly on pumping of groundwater and recharged surface water supplies to meet its demands. With implementation of the projects and management actions identified in the KCSGSP, the City’s groundwater and recharged surface water supplies are anticipated to be sustainable and available to meet the projected demands of its Municipal Water System service area.

The City will construct new wells or rehabilitate existing wells as required to meet projected water demands.

Groundwater wells will be equipped with wellhead treatment as necessary to remove contaminants such as arsenic, 1,2,3-Trichloropropane, and Perfluorooctane Sulfonate (PFOS) that exceed water quality standards.

When SWP supplies are not available from KCWA ID4, the City is able to deliver its Kern River supplies to KCWA’s ID4 for treatment in place of SWP supplies.

The anticipated reliability of the City’s water supplies to meet the needs of the Municipal Water System service area for the various water year types is summarized in Table 7-1 Retail. The historic dry period of 2012 through 2016 is shown as the basis of water year data for the multiple dry year scenarios with 2015 shown as the basis of water year data for the single dry year.

City of Bakersfield 7-2
2025 Urban Water Management Plan
Table 7-1 Retail: Basis of Water Year Data (Reliability Assessment) Year Type Base Year
Available Supplies if
Year Type Repeats
% of Average Supply
Average Year Base Year 100%
Single-Dry Year 2015 100%
Multiple-Dry Years 1st Year 2012 100%
Multiple-Dry Years 2nd Year 2013 100%
Multiple-Dry Years 3rd Year 2014 100%
Multiple-Dry Years 4th Year 2015 100%
Multiple-Dry Years 5th Year 2016 100%
NOTES: The City relies significantly on groundwater pumping to meet its demands. It is anticipated that the City can provide 100% of average supplies in every year.

The City’s Wholesale Water System has contractual stages of action for delivering water to Cal Water during critically dry years. Representatives of the City’s Wholesale Water System and Cal Water meet, and mutually agree, as to when a “critically” dry year is occurring, or is about to occur, and the extent to which reductions and restrictions in the quantity of water delivered to the Cal Water treatment plant will be made.

The recent dry period of 2012 through 2016 is shown as the basis of water year data for the multiple dry year scenarios with 2015 shown as the basis of water year data for the single dry year. The actual Kern River deliveries for the Wholesale Water System for the single dry year and multiple dry year scenarios are provided in Table 7-1 Wholesale.

Table 7-1 Wholesale: Basis of Water Year Data (Reliability Assessment) Year Type Base Year
Available supplies if
year type repeats
Volume available (AF) % of avg supply
Average Year1 Average 100,000 100%
Single-Dry Year 2015 14,079 14%
Multiple-Dry Years 1st Year 2012 32,092 32%
Multiple-Dry Years 2nd Year 2013 22,245 22%
Multiple-Dry Years 3rd Year 2014 18,061 18%
Multiple-Dry Years 4th Year 2015 14,079 14%
Multiple-Dry Years 5th Year 2016 32,001 32%
NOTES:

1. Based on the average historic City water yield per the EIR for the Kern River Flow and Municipal Water Program (see Appendix D) less agricultural deliveries and evaporation losses.

A comparison of the Municipal Water System service area’s normal year potable supply totals fromTable 6- 9 Retail and normal year use totals from Table 4-3 Retail is provided in Table 7-2 Retail. A comparison of the Wholesale Water System’s normal year supply totals fromTable 6-9 Wholesale and normal year demand totals from Table 4-3 Wholesale is provided in Table 7-2 Wholesale.

City of Bakersfield 7-3
2025 Urban Water Management Plan
Table 7-2 Retail: Normal Year Supply and Use Comparison - Potable Water Code Section 10635 (a)
Description 2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF)
Supply totals
(from Table 6-9 Retail) 44,208 44,443 44,372 47,555
Use totals
(from Table 4-2 Retail) 44,208 44,443 44,372 47,555
Difference 0 0 0 0
NOTES: Water supplies and uses do not include recycled water.

Table 7-2 Wholesale: Normal Year Supply and Use Comparison Water Code Section 10635 (a)
Description 2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF)
Supply totals
(from Table 6-9 Wholesale) 100,000 100,000 100,000 100,000 Use totals
(from Table 4-2 Wholesale) 100,000 100,000 100,000 100,000 Difference 0 0 0 0
NOTES:

The City anticipates having no reduction in its available water supplies for the Municipal Water System service area during the single dry year scenario. Its supplies are projected to be adequate to meet demands in future years. A comparison of the Municipal Water System service area’s supply and demand projections for the single dry year scenario is shown in Table 7-3 Retail. Since groundwater pumping is limited to the amount needed to meet demands, the demands are shown to be equal to supplies. Recycled water supplies and the corresponding landscape irrigation demands are not included in Table 7-3 Retail as these do not impact dry year water supply planning for the Municipal Water System.

Table 7-3 Retail: Single Dry Year Supply and Use Comparison Water Code Section 10635(a)
Description 2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF)
Supply totals 44,208 44,443 44,372 47,555
Use totals 44,208 44,443 44,372 47,555
Difference 0 0 0 0
NOTES: Water supplies and uses do not include recycled water.

City of Bakersfield 7-4
2025 Urban Water Management Plan
The comparison of the Municipal Water System’s projected water supplies and uses for the required five- year multiple dry years scenario is provided in Table 7-4 Retail. The City anticipates no reduction in its available supplies during the multiple dry year scenario, especially considering the reduction in future per capita residential water use assumed due to compliance with UWUOs. Since groundwater pumping is limited to the amount needed to meet demands, the demands are shown to be equal to supplies in each year.

Recycled water supplies and the corresponding landscape irrigation demands are not included in Table 7-4 Retail as these do not impact dry year water supply planning for the Municipal Water System .

Table 7-4 Retail: Multiple Dry Years Supply and Use Comparison Water Code Section 10635(a)
Description 2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF)
First year
Supply totals 44,208 44,443 44,372 47,555
Demand totals 44,208 44,443 44,372 47,555
Difference 0 0 0 0
Second year
Supply totals 44,208 44,443 44,372 47,555
Demand totals 44,208 44,443 44,372 47,555
Difference 0 0 0 0
Third year
Supply totals 44,208 44,443 44,372 47,555
Demand totals 44,208 44,443 44,372 47,555
Difference 0 0 0 0
Fourth year
Supply totals 44,208 44,443 44,372 47,555
Demand totals 44,208 44,443 44,372 47,555
Difference 0 0 0 0
Fifth year
Supply totals 44,208 44,443 44,372 47,555
Demand totals 44,208 44,443 44,372 47,555
Difference 0 0 0 0
NOTES: Water supplies and uses do not include recycled water.

The Wholesale Water System replenishes its Kern River supplies to the groundwater basin for the benefit of retail water suppliers providing service to City areas through their respective groundwater wells. Water supplies are stored within the groundwater basin in wet years and extracted by the various retail water agencies to meet their demands when surface water supplies are reduced. The comparison of projected demands within the Wholesale Water System service area and available surface water supplies for the single dry year scenario are provided in Table 7-3 Wholesale.

City of Bakersfield 7-5
2025 Urban Water Management Plan
Table 7-3 Wholesale: Single Dry Year Supply and Use Comparison Water Code Section 10635(a)
Description 2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF)
Supply totals1 14,079 14,079 14,079 14,079
Demand totals2 100,000 100,000 100,000 100,000
Difference3 (85,921) (85,921) (85,921) (85,921)
NOTES:

1. Supply totals from Table 7-1 Wholesale.

2. Demands totals are from Table 4-3 Wholesale and include groundwater recharge.

3. Kern River water supplies are replenished in wet years and stored within the groundwater basin for extraction by the various retail water suppliers during periods of reduced surface water supplies.

The comparison of projected demands within the Wholesale Water System service area and available surface water supplies for the multiple dry year scenarios are provided in Table 7-4 Wholesale.

Table 7-4 Wholesale: Multiple Dry Years Supply and Use Comparison Water Code Section 10635(a)
Description 2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF)
First year
Supply totals1 32,092 32,092 32,092 32,092
Demand totals2 100,000 100,000 100,000 100,000
Difference3 (67,908) (67,908) (67,908) (67,908)
Second year
Supply totals1 22,245 22,245 22,245 22,245
Demand totals2 100,000 100,000 100,000 100,000
Difference3 (77,755) (77,755) (77,755) (77,755)
Third year
Supply totals1 18,061 18,061 18,061 18,061
Demand totals2 100,000 100,000 100,000 100,000
Difference3 (81,939) (81,939) (81,939) (81,939)
Fourth year
Supply totals1 14,079 14,079 14,079 14,079
Demand totals2 100,000 100,000 100,000 100,000
Difference3 (85,921) (85,921) (85,921) (85,921)
Fifth year
Supply totals1 32,001 32,001 32,001 32,001
Demand totals2 100,000 100,000 100,000 100,000
Difference3 (67,999) (67,999) (67,999) (67,999)
NOTES:

1. Supply totals from Table 7-1 Wholesale.

2. Demands totals are from Table 4-3 Wholesale and include groundwater recharge.

3. Kern River water supplies are replenished in wet years and stored within the groundwater basin for extraction by the various retail water suppliers during periods of reduced surface water supplies.

City of Bakersfield 7-6
2025 Urban Water Management Plan

7.02 Description of Management Tools and Options
______________________________________________________________________________________ California Water Code
An urban water supplier shall describe in the plan water management tools and options used by that entity that will maximize resources and minimize the need to import water from other regions (10620(f)).
______________________________________________________________________________________ The tools and options used by the City to maximize resources and minimize the need to import water from other regions include the following, which are described more fully in other sections of the Plan.  Kern River Optimized Conjunctive Use -The City plans to use its full entitlement, less current obligations, to mitigate undesirable results for water levels and water quality in the Urban MA.

Expected benefit is 67,930 acre-feet per year.
 Expand Recycled Water Use in the KRGSA - The City will increase recycled water use inside of the KRGSA from its WWTP No. 3 in 2026 when a contract for use outside of the KRGSA expires (about 72% is currently used outside of the KRGSA). Expected benefit is 13,407 acre-feet per year.  Additional Urban Conservation Measures - To reduce urban demand, additional conservation measures could be considered by the City and other urban retail water purveyors. Such actions are documented in the UWMPs and strict adherence to permanent reductions in urban demand by 2020 are underway. A decrease in the long-term per capita water use is provided in UWMPs and embedded in the projected water budgets for the KRGSA.

7.03 Drought Risk Assessment
______________________________________________________________________________________ California Water Code
Every urban water supplier shall include, as part of its urban water management plan, a drought risk assessment for its water service to its customers as part of information considered in developing the demand management measures and water supply projects and programs to be included in the urban water management plan. The urban water supplier may conduct an interim update or updates to this drought risk assessment within the five-year cycle of its urban water management plan update. The drought risk assessment shall include each of the following:
(1) A description of the data, methodology, and basis for one or more supply shortage conditions that are necessary to conduct a drought risk assessment for a drought period that lasts five consecutive water years, starting from the year following when the assessment is conducted.
(2) A determination of the reliability of each source of supply under a variety of water shortage conditions. This may include a determination that a particular source of water supply is fully reliable under most, if not all, conditions. (3) A comparison of the total water supply sources available to the water supplier with the total projected water use for the drought period (4) Considerations of the historical drought hydrology, plausible changes on projected supplies and demands under climate change conditions, anticipated regulatory changes, and other locally applicable criteria (10635(b)). ______________________________________________________________________________________ City of Bakersfield 7-7
2025 Urban Water Management Plan
The water supplies for the Municipal Water System are projected to be adequate to meet demands during the years of the Drought Risk Assessment. The City’s Kern River supplies have been replenished to the groundwater basin and provide reliability of groundwater supplies for a five-year drought. When SWP supplies are not available from KCWA’s ID4, the City is able to deliver its Kern River water to KCWA’s ID4 for treatment in place of SWP supplies. The Five-Year Drought Risk Assessment for the Municipal Water System is presented in Table 7-5 Retail.

Although the City anticipates no reduction in its available supplies, it is assumed that water supplies and water use are reduced by 10 percent in the third through fifth dry years as a result of water conservation measures expected to be implemented during an extended drought period. Since groundwater pumping is limited to the amount needed to meet use, the water use is shown to be equal to supplies for 2026 and 2027.

In years 2028 through 2030, the reduction in use will be accomplished by implementation of appropriate measures from the Water Shortage Contingency Plan (See Section 8). Recycled water supplies and the corresponding landscape irrigation use are not included in Table 7-5 Retail as these do not impact dry year water supply planning for the Municipal Water System.

Table 7-5 Retail: Five-Year Drought Risk Assessment
Water Code Section 10635(b)
2026 Total
Total Water Use 43,470
Total Supplies 43,470
Surplus/Shortfall w/o WSCP Action 0
Planned WSCP Actions (use reduction and supply augmentation) WSCP – supply augmentation benefit 0
WSCP – use reduction savings benefit 0
Revised Surplus/Shortfall 0
2027 Total
Total Water Use 43,469
Total Supplies 43,469
Surplus/Shortfall w/o WSCP Action 0
Planned WSCP Actions (use reduction and supply augmentation) WSCP – supply augmentation benefit 0
WSCP – use reduction savings benefit 0
Revised Surplus/Shortfall 0
2028 Total
Total Water Use 43,502
Total Supplies 39,152
Surplus/Shortfall w/o WSCP Action (4,350)
Planned WSCP Actions (use reduction and supply augmentation) WSCP – supply augmentation benefit 0
WSCP – use reduction savings benefit 4,350
Revised Surplus/Shortfall 0
City of Bakersfield 7-8
2025 Urban Water Management Plan
2029 Total
Total Water Use 43,508
Total Supplies 39,157
Surplus/Shortfall w/o WSCP Action (4,351)
Planned WSCP Actions (use reduction and supply augmentation) WSCP – supply augmentation benefit 0
WSCP – use reduction savings benefit 4,351
Revised Surplus/Shortfall 0
2030 Total
Total Water Use 44,208
Total Supplies 39,787
Surplus/Shortfall w/o WSCP Action (4,421)
Planned WSCP Actions (use reduction and supply augmentation) WSCP – supply augmentation benefit 0
WSCP – use reduction savings benefit 4,421
Revised Surplus/Shortfall 0
The Five-Year Drought Risk Assessment for the Wholesale Water System is presented in Table 7-5 Wholesale. Water supplies are based on the five-year drought period from Table 7-1 Wholesale. The Wholesale Water System use of 100,000 AF annually includes water supplies used for groundwater recharge. Total water use in Table 7-5 Wholesale is shown to be equal to total supplies in each year since the Wholesale Water System replenishes its Kern River supplies to the groundwater basin for the benefit of retail water suppliers providing service to City areas through their respective groundwater wells.

Water supplies are stored within the groundwater basin in wet years and extracted by the various retail water agencies to meet their water use when surface water supplies are reduced. Wholesale Water System groundwater recharge in future drought years will be reduced to match available supplies. Water use within the retail water agencies is also anticipated to be reduced due to implementation of measures from their respective Water Shortage Contingency Plans (see Section 8 for information on the City’s WSCP).

Table 7-5 Wholesale: Five-Year Drought Risk Assessment
Water Code Section 10635(b)
2026 Total
Total Water Use 32,092
Total Supplies 32,092
Surplus/Shortfall w/o WSCP Action 0
Planned WSCP Actions (use reduction and supply augmentation) WSCP – supply augmentation benefit 0
WSCP – use reduction savings benefit 0
Revised Surplus/Shortfall 0
City of Bakersfield 7-9
2025 Urban Water Management Plan
2027 Total
Total Water Use 22,245
Total Supplies 22,245
Surplus/Shortfall w/o WSCP Action 0
Planned WSCP Actions (use reduction and supply augmentation) WSCP – supply augmentation benefit 0
WSCP – use reduction savings benefit 0
Revised Surplus/Shortfall 0
2028 Total
Total Water Use 18,061
Total Supplies 18,061
Surplus/Shortfall w/o WSCP Action 0
Planned WSCP Actions (use reduction and supply augmentation) WSCP – supply augmentation benefit 0
WSCP – use reduction savings benefit 0
Revised Surplus/Shortfall 0
2029 Total
Total Water Use 14,079
Total Supplies 14,079
Surplus/Shortfall w/o WSCP Action 0
Planned WSCP Actions (use reduction and supply augmentation) WSCP – supply augmentation benefit 0
WSCP – use reduction savings benefit 0
Revised Surplus/Shortfall 0
2030 Total
Total Water Use 32,001
Total Supplies 32,001
Surplus/Shortfall w/o WSCP Action 0
Planned WSCP Actions (use reduction and supply augmentation) WSCP – supply augmentation benefit 0
WSCP – use reduction savings benefit 0
Revised Surplus/Shortfall 0
City of Bakersfield 8-1
2025 Urban Water Management Plan
Section 8: Water Shortage Contingency Plan
The City adopted a Water Shortage Contingency Plan (WSCP) with the elements described in this subsection and is included in Appendix F.

As a wholesale urban water supplier, the Wholesale Water System “shall not include planning elements in its water management plan as provided in Article 2 (commencing with Section 10630) that would be applicable to urban water suppliers or public agencies directly providing water, or to their customers, without the consent of those suppliers or public agencies.” (Water Code Section 10620(c)).

Therefore, elements within the City’s WSCP are noted when they apply directly to the Municipal Water System service area or the Wholesale Water System service area. The retail agencies within the City’s Wholesale Water System service area are responsible for the implementation and enforcement of restrictions and prohibitions at the retail level within their respective service areas.

8.01 Water Supply Reliability Analysis
______________________________________________________________________________________ California Water Code
The analysis of water supply reliability conducted pursuant to Section 10635 (10632(a)(1)). ______________________________________________________________________________________ The findings from the water supply reliability analysis from Section 7 are consistent with those from the water supply reliability analysis summarized in the City’s WSCP (see Appendix F).

8.02 Annual Water Supply and Demand Assessment Procedures ______________________________________________________________________________________ California Water Code
The procedures used in conducting an annual water supply and demand assessment that include, at a minimum, both of the following:
(A) The written decision-making process that an urban water supplier will use each year to determine its water supply reliability
(B) The key data inputs and assessment methodology used to evaluate the urban water supplier’s water supply reliability for the current year and one dry year, including all of the following:
(i) Current year unconstrained demand, considering weather, growth, and other influencing factors, such as policies to manage current supplies to meet demand objectives in future years, as applicable; (ii) Current year available supply, considering hydrological and regulatory conditions in the current year and one dry year. The annual supply and demand assessment may consider more than one dry year solely at the discretion of the urban water supplier; (iii) Existing infrastructure capabilities and plausible constraints; City of Bakersfield 8-2
2025 Urban Water Management Plan
(iv) A defined set of locally applicable evaluation criteria that are consistently relied upon for each annual water supply and demand assessment;
(v) A description and quantification of each source of water supply (10632 (a)(2))
An urban water supplier shall conduct an annual water supply and demand assessment pursuant to subdivision (a) of Section 10632 and, on or before July 1 of each year, submit an annual water shortage assessment report to the department with information for anticipated shortage, triggered shortage response actions, compliance and enforcement actions, and communication actions consistent with the supplier’s water shortage contingency plan. An urban water supplier that relies on imported water from the State Water Project or the Bureau of Reclamation shall submit its annual water supply and demand assessment within 14 days of receiving its final allocations, or by July 1 of each year, whichever is later (10632.1).
______________________________________________________________________________________ Refer to the City’s WSCP inAppendix F for the annual water supply and demand assessment procedures.

8.03 Six Standard Water Shortage Levels
______________________________________________________________________________________ California Water Code
(A) Six standard water shortage levels corresponding to progressive ranges of up to 10, 20, 30, 40, and 50 percent shortages and greater than 50 percent shortage.

Urban water suppliers shall define these shortage levels based on the suppliers’ water supply conditions, including percentage reductions in water supply, changes in groundwater levels, changes in surface elevation or level of subsidence, or other changes in hydrological or other local conditions indicative of the water supply available for use. Shortage levels shall also apply to catastrophic interruption of water supplies, including, but not limited to, a regional power outage, an earthquake, and other potential emergency events; (B) An urban water supplier with an existing water shortage contingency plan that uses different water shortage levels may comply with the requirement in subparagraph (A) by developing and including a cross-reference relating its existing categories to the six standard water shortage levels 10632(a)(3). ______________________________________________________________________________________ The six standard water shortage levels as defined in the City’s WSCP are summarized inTable 8-1.

City of Bakersfield 8-3
2025 Urban Water Management Plan
Table 8-1: Water Shortage Contingency Plan Levels
Water Code Section 10632(a)(3)(B)
Shortage
Level
Percent
Shortage Range Narrative Description
1 Up to 10% Variations in precipitation and mild droughts that may only last a year or two.
2 Up to 20%
Prolonged water shortages of moderate
severity such as those caused by a multi-year
drought.
3 Up to 30%
Most severe multi-year droughts, major
failures in water production and distribution
facilities.
4 Up to 40% An exceptional crisis that could be caused only by the most severe multi-year drought, natural
disaster, or catastrophic failure of major water
supply infrastructure. Impacts to public health
and safety would be significant.
5 Up to 50%
6 >50%
NOTES:

8.04 Shortage Response Actions
______________________________________________________________________________________ California Water Code
Shortage response actions that align with the defined shortage levels and include, at a minimum, all of the following:
(A) Locally appropriate supply augmentation action.
(B) Locally appropriate demand reduction actions to adequately respond to shortages.
(C) Locally appropriate operational changes.
(D) Additional, mandatory prohibitions against specific water use practices that are in addition to state-mandated prohibitions and appropriate to the local conditions. (E) For each action, an estimate of the extent to which the gap between supplies and demand will be reduced by implementation of the action (10632(a)(4)). ______________________________________________________________________________________ The Wholesale Water System will communicate with its retail water system customers regarding the anticipated shortage level and corresponding reductions in available water supplies. The Wholesale Water System will participate in public awareness campaigns and may implement measures to increase available supplies such as short-term water purchases or exchanges depending on the anticipated shortage gap (see Table 8-2 Wholesale). Table 8-2 is not applicable to the City’s Municipal Water System.

City of Bakersfield 8-4
2025 Urban Water Management Plan
Table 8-2 Wholesale: Supply Augmentation and Other Actions Water Code Section 10632(a)(4)(A),(C) and (E)
Shortage Level
Supply Augmentation
Methods and Other
Actions
Reduction in
Shortage Gap
(volume or percent)
Additional
Explanation or
Reference
3 or higher Transfers, exchanges,
purchases, etc.

Will depend on need
and availability
NOTES:

The demand reduction actions for the Municipal Water System service area for each Shortage Level from the City’s WSCP are summarized inTable 8-3 Retail. Table 8-3 is not applicable to the City’s Wholesale Water System.

The Shortage Level in Table 8-3 Retail indicates the shortage level at which the demand reduction actions take effect. For each subsequent Shortage Level, all demand reduction actions from the previous Shortage Levels remain in effect. In Shortage Level 1, the demand reduction actions are voluntary. Starting with Shortage Level 2, the demand reduction actions become mandatory. The City Council may take any other action available to further reduce demands within the Municipal Water System service area to meet available supplies.

Cal Water manages billing for the Municipal Water System and cooperates with the City in providing rebates and water use surveys. See Section 9 for more information on these Demand Management Measures.

Table 8-3 Retail: Demand Reduction Actions
Water Code Section 10632(a)(4)(B),(D), and (E)
Shortage
Level
Demand Reduction
Actions
Shortage Gap
Reduction Value
Additional Explanation or
Reference
Penalty, Charge,
or Other
Enforcement?
All
Shortage
Levels
Expand Public
Information Campaign
Depends on
Shortage Level.

See Notes.

Implemented at all stages
as appropriate to meet
demand reduction targets
No
All
Shortage
Levels
Offer Water Use Surveys
Depends on
Shortage Level.

See Notes.

Implemented at all stages No
All
Shortage
Levels
Provide Rebates on
Plumbing Fixtures and
Devices
Depends on
Shortage Level.

See Notes.

Implemented at all stages No
All
Shortage
Levels
Provide Rebates for
Landscape Irrigation
Efficiency
Depends on
Shortage Level.

See Notes.

Implemented at all stages No
All
Shortage
Levels
Landscape - Restrict or
prohibit runoff from
landscape irrigation
Depends on
Shortage Level.

See Notes.

Implemented at all stages
No for Level 1,
Yes for Levels 2
and Higher
All
Shortage
Levels
Landscape - Limit
landscape irrigation to
specific times
Depends on
Shortage Level.

See Notes.

Advise irrigation to be
done after 6 pm and
before 9 am for optimal
efficiency
No for Level 1,
Yes for Levels 2
and Higher
City of Bakersfield 8-5
2025 Urban Water Management Plan
Shortage
Level
Demand Reduction
Actions
Reduction in
Shortage Gap
Additional Explanation or
Reference
Penalty, Charge,
or Other
Enforcement?
All
Shortage
Levels
CII - Other CII restriction
or prohibition
Depends on
Shortage Level.

See Notes.

Implement water
efficiency measures to
reduce potable water
usage consistent with
reduction targets
No for Level 1,
Yes for Levels 2
and Higher
All
Shortage
Levels
Landscape - Other
landscape restriction or
prohibition
Depends on
Shortage Level.

See Notes.

All irrigation and
landscape projects shall
adhere to the State's
Model Water Efficient
Landscape Ordinance
No for Level 1,
Yes for Levels 2
and Higher
All
Shortage
Levels
Other - Customers must
repair leaks, breaks, and
malfunctions in a timely
manner
Depends on
Shortage Level.

See Notes.

Implemented at all stages
No for Level 1,
Yes for Levels 2
and Higher
All
Shortage
Levels
Other - Require
automatic shut off of
hoses
Depends on
Shortage Level.

See Notes.

Require shut-off nozzles
on hoses for vehicle
washing with potable
water
No for Level 1,
Yes for Levels 2
and Higher
1 Decrease Line Flushing Up to 10%
(See Note 1)
Implemented as
appropriate to meet
demand reduction targets
No
1 Landscape - Limit
landscape irrigation to
specific days
Up to 10%
(See Note 1)
Every other day, three
days per week
No for Level 1,
Yes for Levels 2
and Higher
2 Other - Prohibit use of
potable water for
washing hard surfaces
Up to 20%
(See Note 2) Yes
2 CII - Other CII restriction
or prohibition
Up to 20%
(See Note 2)
Must reduce water usage
consistent with reduction
targets
Yes
3 Increase Water Waste
Patrols
Up to 30%
(See Note 3) No
3 Reduce System Water
Loss
Up to 30%
(See Note 3) No
3 Water Features - Restrict
water use for decorative
water features, such as
fountains
Up to 30%
(See Note 3)
Prohibit water use for
decorative water features
that do not recirculate
water
Yes
3 Other - Prohibit vehicle
washing except at
facilities using recycled or
recirculating water
Up to 30%
(See Note 3) Yes
City of Bakersfield 8-6
2025 Urban Water Management Plan
Shortage
Level
Demand Reduction
Actions
Reduction in
Shortage Gap
Additional Explanation or
Reference
Penalty, Charge,
or Other
Enforcement?
3 Other - Prohibit use of
potable water for
construction and dust
control
Up to 30%
(See Note 3) No
3 Other Up to 30%
(See Note 3)
Implement mandatory
customer reductions Yes
3 Other Up to 30%
(See Note 3)
Implement drought
ordinance Yes
4 Increase Frequency of
Meter Reading
Up to 40%
(See Note 4)
Monitor water use for
compliance reduction
targets
No
4 Landscape - Prohibit all
landscape irrigation
Up to 40%
(See Note 4)
Prohibit all landscape
irrigation with potable
water
Yes
4 Other water feature or
swimming pool
restriction
Up to 40%
(See Note 4)
Prohibit use of water for
recreational purposes
such as water parks and
filling of pools
No
4 Other Up to 40%
(See Note 4)
Promote/expand use of
recycled water No
5 Pools and Spas - Require
covers for pools and spas
Up to 50%
(See Note 5) No
5 Moratorium or Net Zero
Demand Increase on New
Connections
Up to 50%
(See Note 5)
Require net zero demand
increase on new water
service connections
No
6 Landscape - Prohibit all
landscape irrigation
Greater than
50%
(See Note 6)
Yes
6 Moratorium or Net Zero
Demand Increase on New
Connections
Greater than
50%
(See Note 6)
Moratorium on new
water service connections No
NOTES:

1. Target demand reduction for all measures for Shortage Level 1 is up to 10%.

2. Target demand reduction for all measures for Shortage Level 2 is up to 20%.

3. Target demand reduction for all measures for Shortage Level 3 is up to 30%.

4. Target demand reduction for all measures for Shortage Level 4 is up to 40%.

5. Target demand reduction for all measures for Shortage Level 5 is up to 50%.

6. Target demand reduction for all measures through Shortage Level 6 is greater than 50% up to the anticipated shortage gap.

See Appendix F for the City’s complete Water Shortage Contingency Plan.

City of Bakersfield 8-7
2025 Urban Water Management Plan

8.04.1 Seismic Risk Assessment and Mitigation Plan
______________________________________________________________________________________ California Water Code
a) In addition to the requirements of paragraph (3) of subdivision (a) of Section 10632, beginning January 1, 2020, the plan shall include a seismic risk assessment and mitigation plan to assess the vulnerability of each of the various facilities of a water system and mitigate those vulnerabilities.
b) An urban water supplier shall update the seismic risk assessment and mitigation plan when updating its urban water management plan as required by Section 10621.
c) An urban water supplier may comply with this section by submitting, pursuant to Section 10644, a copy of the most recent adopted local hazard mitigation plan or multihazard mitigation plan under the federal Disaster Mitigation Act of 2000 (Public Law 106-390) if the local hazard mitigation plan or multihazard mitigation plan addresses seismic risk (10632.5). ______________________________________________________________________________________ A seismic risk analysis and mitigation plan was completed as a part of the Kern County Multi-Jurisdiction Hazard Mitigation Plan. Earthquake hazard was determined to be a high priority issue county wide. A copy of the most recent draft Jurisdiction Annex for the City of Bakersfield from the Kern County Multi-Jurisdiction Hazard Mitigation Plan is provided in Appendix H. This seismic risk assessment is referenced in the City’s WSCP in Appendix F.

In the event of an earthquake or other catastrophic event, the City will implement its Emergency Response Plan. The City will coordinate with the Kern County Emergency Operations Center in accordance with the Kern County Emergency Operations Plan.

8.05 Communication Protocols
______________________________________________________________________________________ California Water Code
Communication protocols and procedures to inform customers, the public, interested parties, and local, regional, and state governments, regarding, at a minimum, all of the following:
(A) Any current or predicted shortages as determined by the annual water supply and demand assessment described pursuant to Section 10632.1. (B) Any shortage response actions triggered or anticipated to be triggered by the annual water supply and demand assessment described pursuant to Section 10632.1.
(C) Any other relevant communications (10632(a)(5)).
______________________________________________________________________________________ Refer to the City’s WSCP inAppendix F for a description of communication protocols.

City of Bakersfield 8-8
2025 Urban Water Management Plan

8.06 Compliance and Enforcement (Municipal Water System Service Area) ______________________________________________________________________________________ California Water Code
For an urban retail water supplier, customer compliance, enforcement, appeal, and exemption procedures for triggered shortage response actions as determined pursuant to Section 10632.2 (10632(a)(6)).
______________________________________________________________________________________ Refer to the City’s WSCP inAppendix F for compliance and enforcement procedures.

8.07 Legal Authorities
______________________________________________________________________________________ California Water Code
(A) A description of the legal authorities that empower the urban water supplier to implement and enforce its shortage response actions specified in paragraph (4) that may include, but are not limited to, statutory authorities, ordinances, resolutions, and contract provisions.
(B) A statement that an urban water supplier shall declare a water shortage emergency in accordance with Chapter 3 (commencing with Section 350) of Division 1.
(C) A statement that an urban water supplier shall coordinate with any city or county within which it provides water supply services for the possible proclamation of a local emergency, as defined in Section 8558 of the Government Code. (10632(a)(7)).

Water Code Section Division 1, Section 350 - Declaration of water shortage emergency condition.

The governing body of a distributor of a public water supply, whether publicly or privately owned and including a mutual water company, shall declare a water shortage emergency condition to prevail within the area served by such distributor whenever it finds and determines that the ordinary demands and requirements of water consumers cannot be satisfied without depleting the water supply of the distributor to the extent that there would be insufficient water for human consumption, sanitation, and fire protection.
______________________________________________________________________________________ Refer to the City’s WSCP inAppendix F for the legal authorities that empower its implementation.

8.08 Financial Consequences of WSCP
______________________________________________________________________________________ California Water Code
A description of the financial consequences of, and responses for, drought conditions, including, but not limited to, all of the following:
(A) A description of potential revenue reductions and expense increases associated with activated shortage response actions described in paragraph (4); City of Bakersfield 8-9
2025 Urban Water Management Plan
(B) A description of mitigation actions needed to address revenue reductions and expense increases associated with activated shortage response actions described in paragraph (4);
(C) A description of the cost of compliance with Chapter 3.3 (commencing with Section 365) of Division 1 (10632(a)(8)).
______________________________________________________________________________________ Refer to the City’s WSCP inAppendix F for a discussion of the financial consequences of water shortage conditions.

8.09 Monitoring and Reporting (Municipal Water System Service Area) ______________________________________________________________________________________ California Water Code
For an urban retail water supplier, monitoring and reporting requirements and procedures that ensure appropriate data is collected, tracked, and analyzed for purposes of monitoring customer compliance and to meet state reporting requirements (10632(a)(9)). ______________________________________________________________________________________ Refer to the City’s WSCP inAppendix F for monitoring and reporting requirements and procedures.

8.10 WSCP Refinement Procedures (Municipal Water System Service Area) ______________________________________________________________________________________ California Water Code
Reevaluation and improvement procedures for systematically monitoring and evaluating the functionality of the water shortage contingency plan in order to ensure shortage risk tolerance is adequate and appropriate water shortage mitigation strategies are implemented as needed (10632(a)(10)).
______________________________________________________________________________________ Refer to the City’s WSCP inAppendix F for evaluation and refinement procedures.

8.11 Special Water Feature Distinction (Municipal Water System Service Area) ______________________________________________________________________________________ California Water Code
For purposes of developing the water shortage contingency plan pursuant to subdivision (a), an urban water supplier shall analyze and define water features that are artificially supplied with water, including ponds, lakes, waterfalls, and fountains, separately from swimming pools and spas, as defined in subdivision (a) of Section 115921 of the Health and Safety Code (10632(b)). ______________________________________________________________________________________ Refer to the City’s WSCP inAppendix F for measures that may apply to special water features.

City of Bakersfield 8-10
2025 Urban Water Management Plan

8.12 Plan Adoption, Submittal and Availability
______________________________________________________________________________________ California Water Code
The urban water supplier shall make available the water shortage contingency plan prepared pursuant to this article to its customers and any city or county within which it provides water supplies no later than 30 days after adoption of the water shortage contingency plan (10632(c)).

Not later than 30 days after filing a copy of its water shortage contingency plan with the department, the urban water supplier and the department shall make the plan available for public review during normal business hours (10645(b)).

If an urban water supplier revises its water shortage contingency plan, the supplier shall submit to the department a copy of its water shortage contingency plan prepared pursuant to subdivision (a) of Section 10632 no later than 30 days after adoption, in accordance with protocols for submission and using electronic reporting tools developed by the department (10644(b)). ______________________________________________________________________________________ The City’s WSCP was revised and adopted as a part of the 2025 UWMP.

City of Bakersfield 9-1
2025 Urban Water Management Plan
Section 9: Demand Management Measures

9.01 Demand Management Measures
______________________________________________________________________________________ California Water Code
. . .a narrative description that addresses the nature and extent of each water demand management measure implemented over the past five years. The narrative shall describe the water demand management measures that the supplier plans to implement to achieve its water use targets pursuant to Section 10608.20 (10631(e)(1)(A)).

The narrative pursuant to this paragraph shall include descriptions of the following water demand management measures:
i. Water waste prevention ordinances
ii. Metering
iii. Conservation pricing
iv. Public education and outreach
v. Programs to assess and manage distribution system real loss vi. Water conservation program coordination and staffing support vii. Other demand management measures that have a significant impact on water use as measured in gallons per capita per day, including innovative measures, if implemented (10631(e)(1)(B)).

For an urban wholesale water supplier, as defined in Section 10608.12, (provide) a narrative description of the items in clauses (ii), (iv), (vi), and (vii) of subparagraph (B) of paragraph (1), and a narrative description of its distribution system asset management and wholesale supplier assistance programs (10631(e)(2)).
______________________________________________________________________________________

9.01.1 Water Waste Prevention Ordinances (Municipal Water System) The City has adopted water waste prevention measures as a part of its Municipal Code in Chapter 14.02, Chapter 12.28, and Chapter 14.04.300 and as a part of its WSCP. Copies of the City’s Municipal Code chapters are provided in Appendix E. The City’s WSCP is provided inAppendix F.

9.01.2 Metering
All customers within the Municipal Water System service area are charged based on metered readings and established rate schedules. All current and new connections including temporary connections are required to be metered and billed per volume of use. The Municipal Water System also meters and records water use for City owned facilities and landscaping.

The Wholesale Water System meters deliveries to all customers. Customers are billed monthly according to contractual rates.

Existing meters are checked on a regular basis for leakage and accuracy. Cal Water keeps an inventory of all meters in the Municipal Water System as well as a schedule of meter testing and repair by size, type, and customer class. Meters are repaired or replaced as needed to maintain accuracy within the recommended range appropriate for the meter type.

City of Bakersfield 9-2
2025 Urban Water Management Plan

9.01.3 Conservation Pricing (Municipal Water System)
Customers within the Municipal Water System service area are billed a monthly service charge based on meter size and a quantity charge for water usage according to meter readings. A copy of the City’s current rate schedule for the Municipal Water System is provided in Appendix I. The City’s water rate structure meets the definition for conservation pricing since customers are charged a volumetric rate.

9.01.4 Public Education and Outreach
The City has implemented public education and outreach measures including the following:
 Providing water conservation information and links on the City’s website.  Providing funding for bill stuffers to educate and remind customers to conserve water.  Providing water use summaries on customer bills and providing access to detailed water use information through Cal Water’s website.
 Partnering with Cal Water to offer water conservation kits, rebates, and vouchers to encourage customers to implement conservation measures. Information and links are provided on the City’s website.
 Distributing press releases regarding water resource issues and the need for water conservation.  Participating in water conservation media campaigns with other local purveyors.  Participating in “Water Awareness Month” each year in conjunction with the Water Association of Kern County and the American Water Works Association.
 Participating with KCWA ID4 in school education programs including classroom education, water facility tours, and media campaigns. Funding for these programs comes from general tax revenues collected from throughout the metropolitan Bakersfield area.  Participating in local stakeholder events promoting water usage regulations and expanded rebate program.

9.01.5 Programs to Assess and Manage Distribution System Real Loss (Municipal Water System)
The City’s Municipal Water System conducts the required annual water audits for the Municipal Water System using the AWWA Water Audit software. Water production and consumption are monitored to identify possible areas of leakage. Customer billing records are monitored for unusually high water use. A leak detection and repair program is implemented through Cal Water, which provides maintenance of the Municipal Water System under contract and makes repairs as needed.

The City partners with Cal Water to provide water efficiency inspections and landscape water surveys as requested by customers to identify problems and recommend repairs or improvements. Large City owned landscaped areas include master control systems that monitor the irrigation system and alert staff to potential water line leaks or sprinkler head breaks.

9.01.6 Water Conservation Program Coordination and Staffing Support The City partners with Cal Water for the implementation of its Water Conservation Program. Cal Water maintains a Water Conservation Program Coordinator that oversees the water conservation programs available to the City’s Municipal Water System service area customers. The Wholesale Water System does not have a water conservation program coordinator.

City of Bakersfield 9-3
2025 Urban Water Management Plan

9.01.7 Other Demand Management Measures
The City has implemented other demand management measures including the following:
 Using recycled water for irrigation of the Kaiser Permanente Sports Village.  Installing “smart” irrigation controllers in all City parks.  Closing City spray parks during drought conditions.
 Reducing the time and frequency of irrigation for City parks and landscape areas during drought conditions.
 Prohibiting natural lawn within newly constructed City medians.  Reducing the frequency that City vehicles are washed.  Replaced bathroom fixtures with water efficient fixtures at the Mechanics Bank Arena, Theater, and Convention Center, and the San Joaquin Community Ice Center of Bakersfield.  Reducing the frequency and duration of fire apparatus testing operations.  Update of landscape standards to reflect the current State Model Water Efficient Landscape Ordinance.
 Adopting, by reference, the California Green Code sections relating to installation of low water use plumbing fixtures in new construction.
 Maximizing opportunities to convert landscaped areas around City buildings to promote greater water efficiency.
 Aggressively pursuing available grants to further water conservation efforts.

9.01.8 Asset Management (Wholesale Water System)
The Wholesale Water system actively manages its infrastructure. Water system facilities are inspected regularly, and repairs are made as required. Maintenance operations are scheduled as appropriate for each facility.

9.01.9 Wholesale Supplier Assistance Programs
The Wholesale Water System does not have assistance programs beyond those described in other sections of this UWMP.

9.01.10 Implementation over the Past Five Years
______________________________________________________________________________________ California Water Code
(Provide) a narrative description of that addresses the nature and extent of each water demand management measure implemented over the past five years (10631(e)(1)(A)). ______________________________________________________________________________________ A narrative description of the nature of demand management measures implemented over the past five years is provided in previous sections. Cal Water provided information regarding the extent of the implementation of demand management efforts over the past five years within the Municipal Water System service area which is summarized as follows:
 High-Efficiency Washer Rebates – 429
 Premium High-Efficiency Toilet Rebates – 98
City of Bakersfield 9-4
2025 Urban Water Management Plan
 Smart Irrigation Controller Rebates – 944
 Conservation Kits – 242
 Rotating Nozzle Rebates – 131
 Turf Replacement Rebates (square feet) – 33,622
 Drip Irrigation System Rebates (square feet) – 5,858
 Large Rotary Nozzle Rebates – 129
 Pressure Regulated Sprinkler Spray Body Rebates – 200  Smart Landscape Tune Up - 53.

9.01.11 Implementation to Achieve Water Use Targets (Municipal Water System) ______________________________________________________________________________________ California Water Code
The narrative shall describe the water demand management measure that the supplier plans to implement to achieve its water use targets pursuant to Section 10608.20 (10631(e)(1)(A)). ______________________________________________________________________________________ While the Municipal Water System has achieved its water use reduction targets, it will continue with the implementation of its existing DMMs and look for ways to improve water use efficiency.

City of Bakersfield 10-1
2025 Urban Water Management Plan
Section 10: Plan Adoption, Submittal, and
Implementation

10.01 Public Notice
______________________________________________________________________________________ California Water Code
Every urban water supplier required to prepare a plan shall…at least 60 days prior to the public hearing on the plan…notify any city or county within which the supplier provides water supplies that the urban water supplier will be reviewing the plan and considering amendments or changes to the plan (10621(b)).
…Prior to adopting either [the plan or water shortage contingency plan], the urban water supplier shall make both of the plan and the water shortage contingency plan available for public inspection and shall hold a public hearing or hearings thereon. Prior to any of these hearings, notice of the time and place of the hearing shall be published within the jurisdiction of the publicly owned water supplier pursuant to Section 6066 of the Government Code. The urban water supplier shall provide notice of the time and place of a hearing to any city or county within which the supplier provides water supplies (10642).

Government Code section 6066 - Publication of notice pursuant to this section shall be once a week for two successive weeks. Two publications in a newspaper published once a week or oftener, with at least five days intervening between the respective publication dates not counting such publication dates, are sufficient. The period of notice commences upon the first day of publication and terminates at the end of the fourteenth day, including therein the first day.
______________________________________________________________________________________ The efforts the City has taken to involve appropriate agencies and the general public in the planning process are summarized below. Copies of notices are included in Appendix A.

For the 2025 UWMP and WSCP update, the public hearing was held on August 19, 2026. Accordingly, notice was provided as follows:
 Notice to County on March 18, 2026 (at least 60 days prior to hearing),  Letter to Interested Parties (see Section 2.02) on March 18, 2026,  Notice to County and Interested Parties on August 5, 2026 with date and time of hearing,  Notice in local newspaper on August 5 and August 12, 2026 (per Gov. Code 6066 – 2 weeks in advance of hearing),
 Posted Draft 2025 UWMP and WSCP on City of Bakersfield Water Department’s website and Department’s office on August 5, 2026 (2 weeks prior to hearing), and  Drafts of the documents were provided to the entities that requested such drafts.

10.02 Plan Adoption, Submittal, and Implementation
______________________________________________________________________________________ California Water Code
After the hearing or hearings, the plan or water shortage contingency plan shall be adopted as prepared or as modified after the hearing (10642).

City of Bakersfield 10-2
2025 Urban Water Management Plan
Each urban water supplier shall update and submit its 2025 plan to the department by July 1, 2026… (10621(f)).

The urban water supplier shall provide that portion of its urban water management plan prepared pursuant to this article to any city or county within which it provides water supplies no later than 60 days after the submission of its urban water management plan (10635(c)).

The plan, or amendments to the plan, submitted to the department … shall be submitted electronically and shall include any standardized forms, tables, or displays specified by the department (10644(a)(2)).

An urban water supplier shall submit to the department, the California State Library, and any city or county within which the supplier provides water supplies a copy of its plan no later than 30 days after adoption (10644(a)(1).

Not later than 30 days after filing a copy of its plan with the department, the urban water supplier and the department shall make the plan available for public review during normal business hours. (10645(a)).

The amendments to, or changes in, the plan shall be adopted and filed in the manner set forth in Article 3 (commencing with Section 10640) (10621(d)).

Copies of amendments or changes to the plans shall be submitted to the department, the California State Library, and any city or county within which the supplier provides water supplies within 30 days after adoption (10644(a)(1)).
______________________________________________________________________________________ The 2025 UWMP and WSCP update were adopted by the City at the Regular Meeting of the City Council on September 16, 2026. A public hearing was held on August 19, 2026. The intent of the Public Hearing was to gather input from the public that is served by the City as well as other interested entities. Written and verbal comments received during the public hearing process have been addressed as appropriate in the final Plan documents. A copy of the resolution adopting the 2025 UWMP and WSCP update is included in Appendix B.

The 2025 UWMP and WSCP update will be submitted to the California Department of Water Resources, the California State Library, and the County within 30 days of adoption.

Commencing no later than 30 days after adoption, the City will have a copy of the 2025 UWMP and WSCP available for public review at City Hall during normal business hours. The 2025 UWMP and WSCP will also be posted on the City’s website.

PLATE 1

PLATE 4
C
ity of Bakersfield  A‐1  ‐
2025 Urban Water Management Plan
Appendix A:

Notices:
 Notice of UWMP Preparation
 Notice of Public Hearing
 Proof of Publication

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

March 18, 2026

CITY OF BAKERSFIELD
Attn: City Clerk
1600 Truxtun Avenue
Bakersfield, CA 93301

SUBJECT: 60-Day Notice - Preparation of 2025 Update to the City of Bakersfield Urban Water Management Plan

In accordance with the California Water Code Sections 10620 and 10621, you are being notified that the City of Bakersfield is reviewing its Urban Water Management Plan (UWMP) and considering amendments or changes to the Plan. The City’s 2025 UWMP Update is being prepared in accordance with the Urban Water Management Planning Act and current California Water Code requirements.

This letter provides the required 60-day notice of the Public Hearing and Adoption Meeting for the City’s 2025 UWMP Update which is planned to be held in June or July 2026. Information regarding the time and location of the public hearing will be sent at a later date. An electronic file with the draft UWMP is anticipated to be provided during June 2026. After adoption by the City, the UWMP will be submitted to the California Department of Water Resources.

The City welcomes your input regarding the preparation of the 2025 UWMP. If you have any comments regarding the City’s 2025 UWMP Update, please provide them to the City Water Resources Department at your earliest convenience.

Very truly yours,
Kristina Budak, Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

March 18, 2026

COUNTY OF KERN
Attn: County Clerk
1115 Truxtun Avenue
Bakersfield, CA 93301

SUBJECT: 60-Day Notice - Preparation of 2025 Update to the City of Bakersfield Urban Water Management Plan

In accordance with the California Water Code Sections 10620 and 10621, you are being notified that the City of Bakersfield is reviewing its Urban Water Management Plan (UWMP) and considering amendments or changes to the Plan. The City’s 2025 UWMP Update is being prepared in accordance with the Urban Water Management Planning Act and current California Water Code requirements.

This letter provides the required 60-day notice of the Public Hearing and Adoption Meeting for the City’s 2025 UWMP Update which is planned to be held in June or July 2026. Information regarding the time and location of the public hearing will be sent at a later date. An electronic file with the draft UWMP is anticipated to be provided during June 2026. After adoption by the City, the UWMP will be submitted to the California Department of Water Resources.

The City welcomes your input regarding the preparation of the 2025 UWMP. If you have any comments regarding the City’s 2025 UWMP Update, please provide them to the City Water Resources Department at your earliest convenience.

Very truly yours,
Kristina Budak, Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

March 18, 2026

KERN COUNTY PLANNING AND NATURAL RESOURCES
Attn: Craig Murphy, Director
2700 M Street, Suite 100
Bakersfield, CA 93301

SUBJECT: 60-Day Notice - Preparation of 2025 Update to the City of Bakersfield Urban Water Management Plan

In accordance with the California Water Code Sections 10620 and 10621, you are being notified that the City of Bakersfield is reviewing its Urban Water Management Plan (UWMP) and considering amendments or changes to the Plan. The City’s 2025 UWMP Update is being prepared in accordance with the Urban Water Management Planning Act and current California Water Code requirements.

This letter provides the required 60-day notice of the Public Hearing and Adoption Meeting for the City’s 2025 UWMP Update which is planned to be held in June or July 2026. Information regarding the time and location of the public hearing will be sent at a later date. An electronic file with the draft UWMP is anticipated to be provided during June 2026. After adoption by the City, the UWMP will be submitted to the California Department of Water Resources.

The City welcomes your input regarding the preparation of the 2025 UWMP. If you have any comments regarding the City’s 2025 UWMP Update, please provide them to the City Water Resources Department at your earliest convenience.

Very truly yours,
Kristina Budak, Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

March 18, 2026

KERN COUNTY WATER AGENCY ID4
P.O. BOX 58
Bakersfield, CA 93302

SUBJECT: 60-Day Notice - Preparation of 2025 Update to the City of Bakersfield Urban Water Management Plan

In accordance with the California Water Code Sections 10620 and 10621, you are being notified that the City of Bakersfield is reviewing its Urban Water Management Plan (UWMP) and considering amendments or changes to the Plan. The City’s 2025 UWMP Update is being prepared in accordance with the Urban Water Management Planning Act and current California Water Code requirements.

This letter provides the required 60-day notice of the Public Hearing and Adoption Meeting for the City’s 2025 UWMP Update which is planned to be held in June or July 2026. Information regarding the time and location of the public hearing will be sent at a later date. An electronic file with the draft UWMP is anticipated to be provided during June 2026. After adoption by the City, the UWMP will be submitted to the California Department of Water Resources.

The City welcomes your input regarding the preparation of the 2025 UWMP. If you have any comments regarding the City’s 2025 UWMP Update, please provide them to the City Water Resources Department at your earliest convenience.

Very truly yours,
Kristina Budak, Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

March 18, 2026

NORTH OF THE RIVER MUNICIPAL WATER DISTRICT
4000 Rio Del Norte Street
Bakersfield, CA 93308

SUBJECT: 60-Day Notice - Preparation of 2025 Update to the City of Bakersfield Urban Water Management Plan

In accordance with the California Water Code Sections 10620 and 10621, you are being notified that the City of Bakersfield is reviewing its Urban Water Management Plan (UWMP) and considering amendments or changes to the Plan. The City’s 2025 UWMP Update is being prepared in accordance with the Urban Water Management Planning Act and current California Water Code requirements.

This letter provides the required 60-day notice of the Public Hearing and Adoption Meeting for the City’s 2025 UWMP Update which is planned to be held in June or July 2026. Information regarding the time and location of the public hearing will be sent at a later date. An electronic file with the draft UWMP is anticipated to be provided during June 2026. After adoption by the City, the UWMP will be submitted to the California Department of Water Resources.

The City welcomes your input regarding the preparation of the 2025 UWMP. If you have any comments regarding the City’s 2025 UWMP Update, please provide them to the City Water Resources Department at your earliest convenience.

Very truly yours,
Kristina Budak, Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

March 18, 2026

OILDALE MUTUAL WATER COMPANY
P.O. BOX 5638
Bakersfield, CA 93308-5638

SUBJECT: 60-Day Notice - Preparation of 2025 Update to the City of Bakersfield Urban Water Management Plan

In accordance with the California Water Code Sections 10620 and 10621, you are being notified that the City of Bakersfield is reviewing its Urban Water Management Plan (UWMP) and considering amendments or changes to the Plan. The City’s 2025 UWMP Update is being prepared in accordance with the Urban Water Management Planning Act and current California Water Code requirements.

This letter provides the required 60-day notice of the Public Hearing and Adoption Meeting for the City’s 2025 UWMP Update which is planned to be held in June or July 2026. Information regarding the time and location of the public hearing will be sent at a later date. An electronic file with the draft UWMP is anticipated to be provided during June 2026. After adoption by the City, the UWMP will be submitted to the California Department of Water Resources.

The City welcomes your input regarding the preparation of the 2025 UWMP. If you have any comments regarding the City’s 2025 UWMP Update, please provide them to the City Water Resources Department at your earliest convenience.

Very truly yours,
Kristina Budak, Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

March 18, 2026

ROSEDALE-RIO BRAVO WATER STORAGE DISTRICT
849 ALLEN ROAD
Bakersfield, CA 93314

SUBJECT: 60-Day Notice - Preparation of 2025 Update to the City of Bakersfield Urban Water Management Plan

In accordance with the California Water Code Sections 10620 and 10621, you are being notified that the City of Bakersfield is reviewing its Urban Water Management Plan (UWMP) and considering amendments or changes to the Plan. The City’s 2025 UWMP Update is being prepared in accordance with the Urban Water Management Planning Act and current California Water Code requirements.

This letter provides the required 60-day notice of the Public Hearing and Adoption Meeting for the City’s 2025 UWMP Update which is planned to be held in June or July 2026. Information regarding the time and location of the public hearing will be sent at a later date. An electronic file with the draft UWMP is anticipated to be provided during June 2026. After adoption by the City, the UWMP will be submitted to the California Department of Water Resources.

The City welcomes your input regarding the preparation of the 2025 UWMP. If you have any comments regarding the City’s 2025 UWMP Update, please provide them to the City Water Resources Department at your earliest convenience.

Very truly yours,
Kristina Budak, Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

March 18, 2026

VAUGHN WATER COMPANY
10014 GLENN STREET
Bakersfield, CA 93312

SUBJECT: 60-Day Notice - Preparation of 2025 Update to the City of Bakersfield Urban Water Management Plan

In accordance with the California Water Code Sections 10620 and 10621, you are being notified that the City of Bakersfield is reviewing its Urban Water Management Plan (UWMP) and considering amendments or changes to the Plan. The City’s 2025 UWMP Update is being prepared in accordance with the Urban Water Management Planning Act and current California Water Code requirements.

This letter provides the required 60-day notice of the Public Hearing and Adoption Meeting for the City’s 2025 UWMP Update which is planned to be held in June or July 2026. Information regarding the time and location of the public hearing will be sent at a later date. An electronic file with the draft UWMP is anticipated to be provided during June 2026. After adoption by the City, the UWMP will be submitted to the California Department of Water Resources.

The City welcomes your input regarding the preparation of the 2025 UWMP. If you have any comments regarding the City’s 2025 UWMP Update, please provide them to the City Water Resources Department at your earliest convenience.

Very truly yours,
Kristina Budak, Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

March 18, 2026

CALIFORNIA WATER SERVICE
3725 H Street
Bakersfield, CA 93304

SUBJECT: 60-Day Notice - Preparation of 2025 Update to the City of Bakersfield Urban Water Management Plan

In accordance with the California Water Code Sections 10620 and 10621, you are being notified that the City of Bakersfield is reviewing its Urban Water Management Plan (UWMP) and considering amendments or changes to the Plan. The City’s 2025 UWMP Update is being prepared in accordance with the Urban Water Management Planning Act and current California Water Code requirements.

This letter provides the required 60-day notice of the Public Hearing and Adoption Meeting for the City’s 2025 UWMP Update which is planned to be held in June or July 2026. Information regarding the time and location of the public hearing will be sent at a later date. An electronic file with the draft UWMP is anticipated to be provided during June 2026. After adoption by the City, the UWMP will be submitted to the California Department of Water Resources.

The City welcomes your input regarding the preparation of the 2025 UWMP. If you have any comments regarding the City’s 2025 UWMP Update, please provide them to the City Water Resources Department at your earliest convenience.

Very truly yours,
Kristina Budak, Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

March 18, 2026

CASA LOMA WATER COMPANY
1016 Lomita Drive
Bakersfield, CA 93307

SUBJECT: 60-Day Notice - Preparation of 2025 Update to the City of Bakersfield Urban Water Management Plan

In accordance with the California Water Code Sections 10620 and 10621, you are being notified that the City of Bakersfield is reviewing its Urban Water Management Plan (UWMP) and considering amendments or changes to the Plan. The City’s 2025 UWMP Update is being prepared in accordance with the Urban Water Management Planning Act and current California Water Code requirements.

This letter provides the required 60-day notice of the Public Hearing and Adoption Meeting for the City’s 2025 UWMP Update which is planned to be held in June or July 2026. Information regarding the time and location of the public hearing will be sent at a later date. An electronic file with the draft UWMP is anticipated to be provided during June 2026. After adoption by the City, the UWMP will be submitted to the California Department of Water Resources.

The City welcomes your input regarding the preparation of the 2025 UWMP. If you have any comments regarding the City’s 2025 UWMP Update, please provide them to the City Water Resources Department at your earliest convenience.

Very truly yours,
Kristina Budak, Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

March 18, 2026

EAST NILES COMMUNITY SERVICES DISTRICT
P.O. BOX 6038
Bakersfield, CA 93386

SUBJECT: 60-Day Notice - Preparation of 2025 Update to the City of Bakersfield Urban Water Management Plan

In accordance with the California Water Code Sections 10620 and 10621, you are being notified that the City of Bakersfield is reviewing its Urban Water Management Plan (UWMP) and considering amendments or changes to the Plan. The City’s 2025 UWMP Update is being prepared in accordance with the Urban Water Management Planning Act and current California Water Code requirements.

This letter provides the required 60-day notice of the Public Hearing and Adoption Meeting for the City’s 2025 UWMP Update which is planned to be held in June or July 2026. Information regarding the time and location of the public hearing will be sent at a later date. An electronic file with the draft UWMP is anticipated to be provided during June 2026. After adoption by the City, the UWMP will be submitted to the California Department of Water Resources.

The City welcomes your input regarding the preparation of the 2025 UWMP. If you have any comments regarding the City’s 2025 UWMP Update, please provide them to the City Water Resources Department at your earliest convenience.

Very truly yours,
Kristina Budak, Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

March 18, 2026

GREENFIELD COUNTY WATER DISTRICT
551 Taft Highway
Bakersfield, CA 93307

SUBJECT: 60-Day Notice - Preparation of 2025 Update to the City of Bakersfield Urban Water Management Plan

In accordance with the California Water Code Sections 10620 and 10621, you are being notified that the City of Bakersfield is reviewing its Urban Water Management Plan (UWMP) and considering amendments or changes to the Plan. The City’s 2025 UWMP Update is being prepared in accordance with the Urban Water Management Planning Act and current California Water Code requirements.

This letter provides the required 60-day notice of the Public Hearing and Adoption Meeting for the City’s 2025 UWMP Update which is planned to be held in June or July 2026. Information regarding the time and location of the public hearing will be sent at a later date. An electronic file with the draft UWMP is anticipated to be provided during June 2026. After adoption by the City, the UWMP will be submitted to the California Department of Water Resources.

The City welcomes your input regarding the preparation of the 2025 UWMP. If you have any comments regarding the City’s 2025 UWMP Update, please provide them to the City Water Resources Department at your earliest convenience.

Very truly yours,
Kristina Budak, Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

August 5, 2026

CITY OF BAKERSFIELD
Attn: City Clerk
1600 Truxtun Avenue
Bakersfield, CA 93301

SUBJECT: Notice of Public Hearing on 2025 Update to the City of Bakersfield Urban Water Management Plan

The City of Bakersfield (City) will hold a PUBLIC HEARING on August 19, 2026 at 10:00 AM for the purpose of adopting its draft 2025 Urban Water Management Plan (UWMP) and Water Shortage Contingency Plan (WSCP).

The draft 2025 UWMP and WSCP have been prepared pursuant to the “Urban Water Management Planning Act”, California Water Code Sections 10610 through 10657. The California Department of Water Resources requires every urban water supplier to prepare and adopt an updated UWMP at least once every five years, in years ending in five and zero . The WSCP is a stand-alone document that may be updated independent of the UWMP cycle.

The PUBLIC HEARING will be held during the City of Bakersfield Water Board meeting:

Date: August 19, 2026
Time: 10:00 AM
Place: Water Department
1000 Buena Vista Road
Bakersfield, CA 93311

The City invites all interested parties to attend and present their comments. The draft 2025 UWMP and WSCP are available for review at the City’s Water Department and on its website . Please submit written comments by 5:00 PM on Monday August 17
th to the City Water Department at
1000 Buena Vista Road, Bakersfield, CA 93311.

Very truly yours,
Daniel Maldonado, Assistant Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

August 5, 2026

COUNTY OF KERN
Attn: County Clerk
1115 Truxtun Avenue
Bakersfield, CA 93301

SUBJECT: Notice of Public Hearing on 2025 Update to the City of Bakersfield Urban Water Management Plan

The City of Bakersfield (City) will hold a PUBLIC HEARING on August 19, 2026 at 10:00 AM for the purpose of adopting its draft 2025 Urban Water Management Plan (UWMP) and Water Shortage Contingency Plan (WSCP).

The draft 2025 UWMP and WSCP have been prepared pursuant to the “Urban Water Management Planning Act”, California Water Code Sections 10610 through 10657. The California Department of Water Resources requires every urban water supplier to prepare and adopt an updated UWMP at least once every five years, in years ending in five and zero . The WSCP is a stand-alone document that may be updated independent of the UWMP cycle.

The PUBLIC HEARING will be held during the City of Bakersfield Water Board meeting:

Date: August 19, 2026
Time: 10:00 AM
Place: Water Department
1000 Buena Vista Road
Bakersfield, CA 93311

The City invites all interested parties to attend and present their comments. The draft 2025 UWMP and WSCP are available for review at the City’s Water Department and on its website . Please submit written comments by 5:00 PM on Monday August 17
th to the City Water Department at
1000 Buena Vista Road, Bakersfield, CA 93311.

Very truly yours,
Daniel Maldonado, Assistant Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

August 5, 2026

KERN COUNTY PLANNING AND NATURAL RESOURCES
Attn: Craig Murphy, Director
2700 M Street, Suite 100
Bakersfield, CA 93301

SUBJECT: Notice of Public Hearing on 2025 Update to the City of Bakersfield Urban Water Management Plan

The City of Bakersfield (City) will hold a PUBLIC HEARING on August 19, 2026 at 10:00 AM for the purpose of adopting its draft 2025 Urban Water Management Plan (UWMP) and Water Shortage Contingency Plan (WSCP).

The draft 2025 UWMP and WSCP have been prepared pursuant to the “Urban Water Management Planning Act”, California Water Code Sections 10610 through 10657. The California Department of Water Resources requires every urban water supplier to prepare and adopt an updated UWMP at least once every five years, in years ending in five and zero . The WSCP is a stand-alone document that may be updated independent of the UWMP cycle.

The PUBLIC HEARING will be held during the City of Bakersfield Water Board meeting:

Date: August 19, 2026
Time: 10:00 AM
Place: Water Department
1000 Buena Vista Road
Bakersfield, CA 93311

The City invites all interested parties to attend and present their comments. The draft 2025 UWMP and WSCP are available for review at the City’s Water Department and on its website . Please submit written comments by 5:00 PM on Monday August 17
th to the City Water Department at
1000 Buena Vista Road, Bakersfield, CA 93311.

Very truly yours,
Daniel Maldonado, Assistant Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

August 5, 2026

KERN COUNTY WATER AGENCY ID4
3200 Rio Mirada Drive
Bakersfield, CA 93308

SUBJECT: Notice of Public Hearing on 2025 Update to the City of Bakersfield Urban Water Management Plan

The City of Bakersfield (City) will hold a PUBLIC HEARING on August 19, 2026 at 10:00 AM for the purpose of adopting its draft 2025 Urban Water Management Plan (UWMP) and Water Shortage Contingency Plan (WSCP).

The draft 2025 UWMP and WSCP have been prepared pursuant to the “Urban Water Management Planning Act”, California Water Code Sections 10610 through 10657. The California Department of Water Resources requires every urban water supplier to prepare and adopt an updated UWMP at least once every five years, in years ending in five and zero . The WSCP is a stand-alone document that may be updated independent of the UWMP cycle.

The PUBLIC HEARING will be held during the City of Bakersfield Water Board meeting:

Date: August 19, 2026
Time: 10:00 AM
Place: Water Department
1000 Buena Vista Road
Bakersfield, CA 93311

The City invites all interested parties to attend and present their comments. The draft 2025 UWMP and WSCP are available for review at the City’s Water Department and on its website . Please submit written comments by 5:00 PM on Monday August 17
th to the City Water Department at
1000 Buena Vista Road, Bakersfield, CA 93311.

Very truly yours,
Daniel Maldonado, Assistant Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

August 5, 2026

CALIFORNIA WATER SERVICE
3725 H Street
Bakersfield, CA 93304

SUBJECT: Notice of Public Hearing on 2025 Update to the City of Bakersfield Urban Water Management Plan

The City of Bakersfield (City) will hold a PUBLIC HEARING on August 19, 2026 at 10:00 AM for the purpose of adopting its draft 2025 Urban Water Management Plan (UWMP) and Water Shortage Contingency Plan (WSCP).

The draft 2025 UWMP and WSCP have been prepared pursuant to the “Urban Water Management Planning Act”, California Water Code Sections 10610 through 10657. The California Department of Water Resources requires every urban water supplier to prepare and adopt an updated UWMP at least once every five years, in years ending in five and zero . The WSCP is a stand-alone document that may be updated independent of the UWMP cycle.

The PUBLIC HEARING will be held during the City of Bakersfield Water Board meeting:

Date: August 19, 2026
Time: 10:00 AM
Place: Water Department
1000 Buena Vista Road
Bakersfield, CA 93311

The City invites all interested parties to attend and present their comments. The draft 2025 UWMP and WSCP are available for review at the City’s Water Department and on its website . Please submit written comments by 5:00 PM on Monday August 17
th to the City Water Department at
1000 Buena Vista Road, Bakersfield, CA 93311.

Very truly yours,
Daniel Maldonado, Assistant Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

August 5, 2026

EAST NILES COMMUNITY SERVICES DISTRICT
P.O. BOX 6038
Bakersfield, CA 93386

SUBJECT: Notice of Public Hearing on 2025 Update to the City of Bakersfield Urban Water Management Plan

The City of Bakersfield (City) will hold a PUBLIC HEARING on August 19, 2026 at 10:00 AM for the purpose of adopting its draft 2025 Urban Water Management Plan (UWMP) and Water Shortage Contingency Plan (WSCP).

The draft 2025 UWMP and WSCP have been prepared pursuant to the “Urban Water Management Planning Act”, California Water Code Sections 10610 through 10657. The California Department of Water Resources requires every urban water supplier to prepare and adopt an updated UWMP at least once every five years, in years ending in five and zero . The WSCP is a stand-alone document that may be updated independent of the UWMP cycle.

The PUBLIC HEARING will be held during the City of Bakersfield Water Board meeting:

Date: August 19, 2026
Time: 10:00 AM
Place: Water Department
1000 Buena Vista Road
Bakersfield, CA 93311

The City invites all interested parties to attend and present their comments. The draft 2025 UWMP and WSCP are available for review at the City’s Water Department and on its website . Please submit written comments by 5:00 PM on Monday August 17
th to the City Water Department at
1000 Buena Vista Road, Bakersfield, CA 93311.

Very truly yours,
Daniel Maldonado, Assistant Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

August 5, 2026

GREENFIELD COUNTY WATER DISTRICT
551 Taft Highway
Bakersfield, CA 93307

SUBJECT: Notice of Public Hearing on 2025 Update to the City of Bakersfield Urban Water Management Plan

The City of Bakersfield (City) will hold a PUBLIC HEARING on August 19, 2026 at 10:00 AM for the purpose of adopting its draft 2025 Urban Water Management Plan (UWMP) and Water Shortage Contingency Plan (WSCP).

The draft 2025 UWMP and WSCP have been prepared pursuant to the “Urban Water Management Planning Act”, California Water Code Sections 10610 through 10657. The California Department of Water Resources requires every urban water supplier to prepare and adopt an updated UWMP at least once every five years, in years ending in five and zero . The WSCP is a stand-alone document that may be updated independent of the UWMP cycle.

The PUBLIC HEARING will be held during the City of Bakersfield Water Board meeting:

Date: August 19, 2026
Time: 10:00 AM
Place: Water Department
1000 Buena Vista Road
Bakersfield, CA 93311

The City invites all interested parties to attend and present their comments. The draft 2025 UWMP and WSCP are available for review at the City’s Water Department and on its website . Please submit written comments by 5:00 PM on Monday August 17
th to the City Water Department at
1000 Buena Vista Road, Bakersfield, CA 93311.

Very truly yours,
Daniel Maldonado, Assistant Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

August 5, 2026

NORTH OF THE RIVER MUNICIPAL WATER DISTRICT
2836 McCray Street
Bakersfield, CA 93308

SUBJECT: Notice of Public Hearing on 2025 Update to the City of Bakersfield Urban Water Management Plan

The City of Bakersfield (City) will hold a PUBLIC HEARING on August 19, 2026 at 10:00 AM for the purpose of adopting its draft 2025 Urban Water Management Plan (UWMP) and Water Shortage Contingency Plan (WSCP).

The draft 2025 UWMP and WSCP have been prepared pursuant to the “Urban Water Management Planning Act”, California Water Code Sections 10610 through 10657. The California Department of Water Resources requires every urban water supplier to prepare and adopt an updated UWMP at least once every five years, in years ending in five and zero . The WSCP is a stand-alone document that may be updated independent of the UWMP cycle.

The PUBLIC HEARING will be held during the City of Bakersfield Water Board meeting:

Date: August 19, 2026
Time: 10:00 AM
Place: Water Department
1000 Buena Vista Road
Bakersfield, CA 93311

The City invites all interested parties to attend and present their comments. The draft 2025 UWMP and WSCP are available for review at the City’s Water Department and on its website . Please submit written comments by 5:00 PM on Monday August 17
th to the City Water Department at
1000 Buena Vista Road, Bakersfield, CA 93311.

Very truly yours,
Daniel Maldonado, Assistant Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

August 5, 2026

OILDALE MUTUAL WATER COMPANY
P.O. BOX 5638
Bakersfield, CA 93308-5638

SUBJECT: Notice of Public Hearing on 2025 Update to the City of Bakersfield Urban Water Management Plan

The City of Bakersfield (City) will hold a PUBLIC HEARING on August 19, 2026 at 10:00 AM for the purpose of adopting its draft 2025 Urban Water Management Plan (UWMP) and Water Shortage Contingency Plan (WSCP).

The draft 2025 UWMP and WSCP have been prepared pursuant to the “Urban Water Management Planning Act”, California Water Code Sections 10610 through 10657. The California Department of Water Resources requires every urban water supplier to prepare and adopt an updated UWMP at least once every five years, in years ending in five and zero . The WSCP is a stand-alone document that may be updated independent of the UWMP cycle.

The PUBLIC HEARING will be held during the City of Bakersfield Water Board meeting:

Date: August 19, 2026
Time: 10:00 AM
Place: Water Department
1000 Buena Vista Road
Bakersfield, CA 93311

The City invites all interested parties to attend and present their comments. The draft 2025 UWMP and WSCP are available for review at the City’s Water Department and on its website . Please submit written comments by 5:00 PM on Monday August 17
th to the City Water Department at
1000 Buena Vista Road, Bakersfield, CA 93311.

Very truly yours,
Daniel Maldonado, Assistant Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

Water Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127

August 5, 2026

ROSEDALE-RIO BRAVO WATER STORAGE DISTRICT
849 ALLEN ROAD
Bakersfield, CA 93314

SUBJECT: Notice of Public Hearing on 2025 Update to the City of Bakersfield Urban Water Management Plan

The City of Bakersfield (City) will hold a PUBLIC HEARING on August 19, 2026 at 10:00 AM for the purpose of adopting its draft 2025 Urban Water Management Plan (UWMP) and Water Shortage Contingency Plan (WSCP).

The draft 2025 UWMP and WSCP have been prepared pursuant to the “Urban Water Management Planning Act”, California Water Code Sections 10610 through 10657. The California Department of Water Resources requires every urban water supplier to prepare and adopt an updated UWMP at least once every five years, in years ending in five and zero . The WSCP is a stand-alone document that may be updated independent of the UWMP cycle.

The PUBLIC HEARING will be held during the City of Bakersfield Water Board meeting:

Date: August 19, 2026
Time: 10:00 AM
Place: Water Department
1000 Buena Vista Road
Bakersfield, CA 93311

The City invites all interested parties to attend and present their comments. The draft 2025 UWMP and WSCP are available for review at the City’s Water Department and on its website . Please submit written comments by 5:00 PM on Monday August 17
th to the City Water Department at
1000 Buena Vista Road, Bakersfield, CA 93311.

Very truly yours,
Daniel Maldonado, Assistant Water Director

By: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

W
ater Department
1000 Buena Vista Road, Bakersfield, CA 93311
661-326-3715 FAX: 661-852-2127
August 5, 2026

VAUGHN WATER COMPANY
4600 ROSEDALE LN
Bakersfield, CA 93314-8688
SUBJ
ECT: Notice of Public Hearing on 2025 Update to the
City of Bakersfield Urban Water Management Plan
The City of Bakersfield (City) will hold a PUBLIC HEARING on August 19, 2026 at 10:00 AM for the purpose of adopting its draft 2025 Urban Water Management Plan (UWMP) and Water Shortage Contingency Plan (WSCP).

Th
e draft 2025 UWMP and WSCP have been prepared pursuant to the “Urban Water Management Planning Act”, California Water Code Sections 10610 through 10657. The California Department of Water Resources requires every urban water supplier to prepare and adopt an updated UWMP at least once every five years, in years ending in five and zero . The WSCP is a stand-alone document that may be updated independent of the UWMP cycle.

T
he PUBLIC HEARING will be held during the City of Bakersfield Water Board meeting:

D
ate: August 19, 2026
Time: 10:00 AM
Place: Water Department
1000 Buena Vista Road
Bakersfield, CA 93311
T
he City invites all interested parties to attend and present their comments. The draft 2025 UWMP and WSCP are available for review at the City’s Water Department and on its website . Please submit written comments by 5:00 PM on Monday August 17th to the City Water Department at 1000 Buena Vista Road, Bakersfield, CA 93311.

V
ery truly yours,
Daniel Maldonado, Assistant Water Director
B
y: ________________________________________
Dillon O’Donohue, P.E.

Civil Engineer III, Water Department

City of Bakersfield B-1 -
2025 Urban Water Management Plan
Appendix B:

Resolution Adopting 2025 UWMP
City of Bakersfield C-1 -
2025 Urban Water Management Plan
Appendix C:

Climate Change Information from
Kern County Subbasin GSP

Kern County Subbasin
Groundwater Sustainability Plan 9-64

9.6 Projected Future Subbasin Water Budget

Projected (future) water budgets for the Kern Subbasin were developed using the C2VSimFG-Kern. These projected water budgets establish expected Baseline conditions to evaluate the impacts of GSP implementation. Three projected scenarios, each representing a different expected future hydrologic condition, were developed for the Kern Subbasin by adapting C2VSimFG-Kern as follows:
• Future Baseline Conditions: Repeat historical hydrology with expected future water supply.
• 2030 Climate Conditions: Adjust historical hydrology for 2030 climatic conditions and expected water supply.
• 2070 Climate Conditions: Adjust historical hydrology for 2070 climatic conditions and expected water supply.
§ 354.18. Water Budget
(b) Each Plan shall quantify the current, historical, and projected water budget for the basin as follows:
(3) Projected water budgets shall be used to estimate future baseline conditions of supply, demand, and aquifer response to Plan implementation, and to identify the uncertainties of these projected water budget components. The projected water budget shall utilize the following methodologies and assumptions to estimate future baseline conditions concerning hydrology, water demand and surface water supply availability or reliability over the planning and implementation horizon:
(A) Projected hydrology shall utilize 50 years of historical precipitation, evapotranspiration, and streamflow information as the baseline condition for estimating future hydrology. The projected hydrology information shall also be applied as the baseline cond ition used to evaluate future scenarios of hydrologic uncertainty associated with projections of climate change and sea level rise.
(B) Projected water demand shall utilize the most recent land use, evapotranspiration, and crop coefficient information as the baseline condition for estimating future water demand. The projected water demand information shall also be applied as the baseline condition used to evaluate future scenarios of water demand uncertainty associated with projected changes in local land use planning, population growth, and climate. (C) Projected surface water supply shall utilize the most recent water supply information as the baseline condition for estimating future surface water supply. The projected surface water supply shall also be applied as the baseline condition used to evaluate future scenarios of surface water supply availability and reliability as a function of the historical surface water supply identified in Section 354.18(c)(2)(A), and the projected changes in local land use planning, population growth, and climate.
(d) The Agency shall utilize the following information provided, as available, by the Department pursuant to Section 353.2, or other data of comparable quality, to develop the water budget:
(3) Projected water budget information for population, population growth, climate change, and sea level rise.
 23 CCR § 354.18(c)(3)
 23 CCR § 354.18(d)(3)

Kern County Subbasin
Groundwater Sustainability Plan 9-65
Projected future water budgets were developed for the three scenarios listed above over a 50-year planning and implementation horizon. To assess the sustainability of the proposed Plan, the C2VSimFG-Kern model future scenario input files were then modified to create three additional scenarios that incorporate all the P/MAs. The six total scenario models provide a basis of comparison for evaluating proposed P/MAs over the SGMA planning and implementation horizon with varying degrees of climate change impacts.

9.6.1 Projected Water Budget Methods and Data Sources

C2VSimFG-Kern was modified to incorporate projected future hydrology and land use using analog data from the historical C2VSimFG-Kern model. This approach meets GSP requirements using:
• A 50-year time-series of historical precipitation, evapotranspiration, and stream flow information as the future Baseline hydrology conditions. • The most recent land use, satellite-based evapotranspiration, crop coefficient and urban population growth information as the Baseline condition for estimating future water demands.
• The most recent water supply projections as the Baseline condition for estimating future surface water supply.
• DWR (2018a) Climate Change Guidance and Data Sets to incorporate estimated climate change conditions for the Kern Subbasin. • Specialized analysis of the Kern River watershed and estimated runoff volumes under climate change conditions.
• Specialized analysis of CVP deliveries to Kern County under climate change conditions incorporating implementation of the San Joaquin River Restoration Program.
• Specialized analysis of SWP deliveries to Kern County under climate change conditions incorporating implementation of the Operations, Criteria, and Plan (OCAP) Biological Opinion and recent changes in Table A and Article 21 allocations.

9.6.2 Development of Projected Water Budget Scenarios

Projected water budgets for the Kern Subbasin were developed using the C2VSimFG-Kern to evaluate the performance of P/MAs with respect to achieving  23 CCR § 354.18(c)(3)
 23 CCR § 354.18(d)(3)

 23 CCR § 354.18(c)(3)
 23 CCR § 354.18(d)(3)

Kern County Subbasin
Groundwater Sustainability Plan 9-66
groundwater sustainability. Participating agencies provided a list of projected future P/MAs to be implemented between WY2021 and WY2040. Projected future conditions under Baseline conditions, 2030 Climate Conditions, and 2070 Climate Conditions were simulated both with and without these projects through WY2070 using the C2VSimFG- Kern model, for a total of six projected scenarios.

Proposed future P/MAs were provided by GSAs. The types of P/MAs are summarized as follows:
• “Demand Reduction” P/MAs involve reducing the volume of water use, typically through changes in land use, including:
o Agricultural demand reduction projects through incentives or actions to reduce crop water use.
o Agricultural land retirement and conversion of agricultural land to recharge basins.
o Conversion of agricultural land to urban land.
• “Supplemental Water Supply” P/MAs involve increasing water supplies, including:
o Increased surface water imports generally resulting from projected, or already contracted, water purchases.
o New water conveyance facilities including pipelines and reservoirs to increase flexibility.
o Expansion of surface water delivery areas to reduce groundwater usage. • “Other Local Water Supply” P/MAs involve increasing local water supplies, including:
o Utilizing treated wastewater derived from both urban areas and oil production operations; increased utilization occurs in both existing and new locations. o Increased stream flow diversions: these include exercising riparian water rights and diverting flood flows.
o Reallocation of water; generally reducing sales of surface water and stored surface water in some GSAs and using this water within the agency. o Augmenting surface water supplies with treated brackish water.

Some P/MAs are implemented gradually over many years, with savings increasing each year over the implementation period. Some are implemented only in certain years (wet years, for example). The anticipated average-annual water supply benefit of the proposed P/MAs steadily increases over the 20-year period from WY2021 to WY2040 to represent the implementation of the Kern Subbasin Plan. This increasing trend, as shown as the average-annual water supply benefit over five-year increments shown in Figure 9-17, is summarized as follows:

Kern County Subbasin
Groundwater Sustainability Plan 9-67
• About 116,000 AFY over the first five-year period (WY2021 to WY2025). • About 216,000 AFY over the second five-year period (WY2026 to WY2030). • About 343,000 AFY over the third five-year period (WY2031 to WY2035). • About 361,000 AFY over the fourth five-year period (WY2036 to WY2040).

The anticipated water supply benefit of the proposed P/MAs included in the C2VSimFG-Kern projected future simulations is 422,000 AFY over the period from WY2041 to WY2070. Benefits of implementing these P/MAs over the 20-year implementation period are summarized in Figure 9-17.

9.6.2.1 Projected Future Baseline Development
Projected water budgets are required by SGMA Regulations to represent future conditions over a 50-year planning and implementation horizon. A Baseline condition was developed that projects water supply, demand and operations based on current land use and expected water supply availability over 50 years. The Baseline then serves as a basis of comparison for evaluating proposed P/MAs for achieving sustainability over the planning and implementation horizon. Each predictive scenario model simulates the 50-year planning and implementation period WY2021 to WY2070.

Development of the projected future Baseline conditions is summarized below.

9.6.2.2 Projected Future Time Period Development
WY1995 to WY2014 is used as a historical hydrology period because detailed demand and supply data are available for this period, and because most Kern Subbasin water delivery infrastructure was fully developed by the middle of this period. The average Kern River inflow for this period is also very close to the long-term average Kern River inflow.

The projected future simulation period is based on repeating the WY1995 to WY2014 historical study period. Since the historical period is only 20 years long, the 50-year sequence of hydrology was developed by repeating data from the historical period as shown in Appendix H-1, Table 18, and summarized below:
• Simulation period WY2021 to WY2032 uses the historical period WY2003 to WY2014.
• Simulation period WY2033 to WY2052 uses the historical period WY1995 to WY2014.
• Simulation period WY2053 to WY2070 uses the historical period WY1995 to WY2012.

This sequence is used to match long-term average flows on the Kern River, and to ensure that the 50-year simulation period does not end in an extreme drought or extreme wet year. By starting the projected 50-year future simulation period with

Kern County Subbasin
Groundwater Sustainability Plan 9-68
WY2003, the period has approximately 100 percent of the long-term average streamflow conditions on the Kern River, as indicated by an average annual Kern River Index of 100 percent. The sequence includes the appropriate range of hydrologic conditions including extremely wet years and extended periods of drought.

Kern County Subbasin
Groundwater Sustainability Plan 9-69

Figure 9-17. Average Annual Benefit of Proposed SGMA Projects and Management Actions

Kern County Subbasin
Groundwater Sustainability Plan 9-70

9.6.2.3 Development of Key Baseline Data Sets
Key required components for the Projected Future Baseline, as summarized in the DWR Water Budget Best Management Practices (DWR, 2016B) include the following:
• The projected Baseline hydrology conditions use 50-years of historical precipitation and streamflow following the sequence outlined in Section 6.1. • Surface water supplies are based on available information from DWR and others to project future water imports from the SWP, CVP, and Kern River diversions. For the Kern River, recent diversion practices based on entitlements are used to develop water use consistent with the Baseline hydrology. • WY2013 land use is used as current land use as representative of land use prior to implementation of SGMA in 2015. Drought conditions in WY2014 and WY2015 resulted in reduced agricultural production, and more recent land use begins to include changes as a result of SGMA.
• Consumptive use for agriculture and undeveloped lands is based on the current land use and ITRC METRIC-based evapotranspiration. Following DWR guidance, ITRC METRIC data over the Baseline period is varied according to varying hydrologic conditions (e.g., water year type).
• Urban water demand is based on projections from recent urban water management plans to meet regulations for future water use. Urban demand is estimated in the model based on projected urban population growth and per capita water demand information (including recent regulatory guidance). • Small watershed inflows use the same parameters as the historical C2VSimFG-Kern model; however, volumes varied based on changes in the precipitation and ET under the 2030 and 2070 climate change conditions.

Time-series input data were first developed for the Baseline scenario model for WY2021 to WY2070. Development of this time-series input data generally involved repeating time-series data from the historical C2VSimFG-Kern in the appropriate sequence. The following time-series data were developed for each scenario:
• Precipitation rates
• Evapotranspiration rates
• Surface water inflow rates
• Surface water diversion and delivery rates
• Specified groundwater pumping rates
Baseline scenario model time-series data files were then modified following DWR guidelines to produce time-series input data for the 2030 Climate Conditions and 2070 Climate Conditions scenarios. C2VSimFG-Kern input data were modified only in Kern

Kern County Subbasin
Groundwater Sustainability Plan 9-71
County. C2VSimFG-Kern input data for areas outside of Kern County were not modified.

These baseline data sets are incorporated into the model files to develop the projected future water demand and supply under Baseline, 2030 Climate and 2070 Climate conditions. A summary of the development of the projected future water demand and supply is discussed below.

9.6.2.4 Projected Future Water Demand
The projected future water demand uses fixed WY2013 land use areas with historical evapotranspiration rates for the Baseline and modified evapotranspiration rates for the 2030 and 2070 Climate Scenarios. An increasing urban population was projected based on urban water management plans and other information to develop projected-future water demand for the Baseline, 2030 and 2070 Climate Scenarios.

9.6.2.5 Agricultural Water Demand
Evapotranspiration rates for the Baseline scenario model use repeating input evapotranspiration rates from C2VSimFG-Kern in the appropriate sequence. DWR provided monthly change factors for ETo values under 2030 and 2070 central tendency climatic conditions on a 6 km x 6 km Variable Infiltration Capacity Model (VIC) grid for calendar years 1915 through 2011 (DWR 2018A). The VIC grid IDs for each C2VSim subregion in the Kern Subbasin were identified and area weighted monthly ETo change factors were calculated for each subregion. Baseline scenario ETc rates for each subregion were then multiplied by the appropriate area-weighted ETo change factors to produce time-series ETc rates for the 2030 Climate and 2070 Climate scenarios.

Factors for calendar years 1959 to 1961 are used as analogs for calendar years 2012 to 2014.

9.6.2.6 Urban Water Demand
Urban water demand calculations include an indoor component and an outdoor component. Indoor urban water demands are based on the urban population and monthly per capita water demand. Future urban populations for Kern County urban areas are estimated using California Department of Finance population projections.

Future per capita urban water demands are estimated using projections from urban water management plans and California urban water conservation regulations, including SB 606 and AB 1668. Future outdoor urban water demands are based on ETc rates, which were modified as described in the Agricultural Water Demand section above.

9.6.2.7 Water Banking Recovery
Future water banking recovery rates use repeating historical recovery rates in the appropriate sequence. No adjustments were made to Baseline rates or to rates for 2030 and 2070 climatic conditions.

Kern County Subbasin
Groundwater Sustainability Plan 9-72

9.6.2.8 Projected Future Water Supply
Projected future precipitation, stream inflow and surface water imports time series were developed following DWR guidelines.

9.6.2.9 Precipitation Rates
Precipitation rates for the Baseline scenario model use repeating input precipitation rates from C2VSimFG-Kern in the appropriate sequence. DWR provided monthly change factors for precipitation under 2030 and 2070 central tendency climatic conditions on a 6 km x 6 km VIC grid for calendar years 1915 through 2011 (DWR 2018A). The VIC grid ID for each C2VSim element in the Kern Subbasin was identified and the Baseline scenario precipitation rates were multiplied by the appropriate factors to produce time-series precipitation rates for the 2030 Climate and 2070 Climate scenarios. Factors for calendar years 1959 to 1961 are used as analogs for calendar years 2012 to 2014.

9.6.2.10 Surface Water Inflow Rates
Surface water inflow rates for Poso Creek and the White River for the Baseline scenario model use repeating input inflow rates from C2VSimFG-Kern in the appropriate sequence. DWR (2018a) provided unimpaired streamflow change factor datasets for Central Valley streams, and an Excel spreadsheet tool to modify basin unimpaired streamflow using these change factors. The unimpaired streamflow change factors and spreadsheet were used to modify Baseline inflows to produce 2030 Climate and 2070 Climate scenario time series inflows for Poso Creek and White River.

Surface water inflow rates for the Kern River at First Point for the Baseline scenario model use repeating historical inflow rates from C2VSimFG-Kern in the appropriate sequence. Flows on the Kern River are regulated, so the unimpaired streamflow method is not appropriate for estimating future flows under 2030 and 2070 climatic conditions.

Projected Kern River flows at First Point under 2030 and 2070 central tendency conditions were estimated by GEI (2018) using calendar years 1956 to 2010 hydrology.

The analysis considered the impacts of changed runoff in each sub-watershed contributing to the Kern River to develop revised streamflow estimates for Kern River at First Point. Projected scenario flows for the Kern River at First Point for calendar years 2011 to 2014 are estimated using flows for analog years with similar annual flows and monthly flow pattern. Analog years 1986, 1991, 1990 and 1961 are used for calendar years 2011 to 2014 in the projected scenarios. Figure 9-18 graphically summarizes the changes in Kern River water supplies relative to historical data. The lower graph shown in Figure 9-18 shows the average monthly shift in Kern River inflows after applying 2030 and 2070 climate change guidance to historical flows. In general, the annual Kern River flows remain similar; however, the peak flows shift in time. The monthly shifts show an increase in flow during December through February and a decrease in flow during May, June, and July.

Kern County Subbasin
Groundwater Sustainability Plan 9-73

9.6.2.11 Surface Water Deliveries
Surface water delivery rates for the Baseline scenario model were developed by first repeating input surface water delivery rates from the C2VSimFG-Kern in the appropriate sequence and then modifying selected data sets. Surface water deliveries from local imported sources such as recycled produced water are held constant at WY2015 rates for all projected scenarios.

The Kern Subbasin is served by both the CVP and the SWP. Recent changes in CVP and SWP operations and their impacts on future surface water supplies are reflected in surface water diversion rates for the three scenarios.

Future CVP deliveries will be affected by implementation of the San Joaquin River Restoration Program (SJRRP) that includes the 2008 U.S. Fish & Wildlife Service biological opinion (BO) on the Long-Term Operational Criteria and Plan (OCAP) for coordination of the CVP and SWP.

Future CVP delivery projections developed by the Friant Water Authority (FWA) were used in place of DWR’s CVP projections. FWA (2018) used CalSim-II to develop projected surface water deliveries with SJRRP implementation under hydrological conditions representing the Baseline, 2030 Climate, and 2070 Climate conditions by delivery class for WY1922 to WY2003, and estimated allocations to each CVP contractor. The 2015.c data set is used for Baseline scenario CVP deliveries, the 2030.c data set is used for the 2030 Climate scenario CVP deliveries, and the 2070.c data set is used for the 2070 Climate scenario CVP deliveries. A summary of each of these data sets from FWA (2018) is provided below:
• “2015.c” was designed to represent current conditions, where implementation of the San Joaquin River Restoration Settlement (SJRRS) is limited by downstream capacity limitations and the climate and hydrology are assumed to be most similar to historical hydrologic conditions.
• “2030.c” was designed to represent near future climate conditions centered around 2030 and uses DWR’s central tendency climate projection. This scenario assumes implementation of the SJRRS.
• “2070.c” was designed to represent far-future climate conditions centered around 2070 and uses DWR’s central tendency climate projection. This scenario assumes implementation of the SJRRS.

CVP deliveries for WY2004 to WY2014 are estimated using deliveries for analog years WY1951 to WY1961; these analog years have a similar distribution of water availability.

Figure 9-19 graphically presents the average annual CVP deliveries to the Kern Subbasin based on the FWA (2018) guidance. The monthly values show a general decrease in deliveries but not a temporal shift. The net result of the climate change modifications is that CVP deliveries to the Kern Subbasin for the 2030 Climate scenario

Kern County Subbasin
Groundwater Sustainability Plan 9-74
are 80 percent of the Baseline scenario and CVP deliveries for the 2070 scenario are 68 percent of the Baseline scenario.

Future SWP deliveries will be affected by operational changes implemented between 2004 and 2008 including the OCAP BO, reduced Table A contract amounts and reduced Article 21 deliveries. DWR provided projected future deliveries from the CVP and SWP for WY1922 to WY2003, derived from CalSim-II modeling conducted for the Water Supply Investment Program (WSIP) (California Water Commission, 2016).

The SWP projections provided by DWR for WY1995 to WY2003 and historical deliveries for WY2004 to WY2014 were modified to incorporate the impacts of SWP operational changes in the three projected scenarios. A summary of the modifications to historical SWP deliveries to develop an equivalent projected-future SWP delivery schedule are summarized below:
• Baseline Hydrologic Conditions:
o WY1995 to WY2003 conditions are based on 2030-Level CALSIM increased by 3.03 percent.
o WY2004 to WY2007 conditions are based on historical data adjusted for OCAP BO.
o WY2008 to WY2014 conditions are based on historical data with the assumption that OCAP BO adjustments are already factored into the data. • 2030 Climate Conditions:
o WY1995 to WY2003 conditions are based on the 2030-Level CALSIM Projection.
o WY2004 to WY2007 conditions are based on OCAP BO adjustment reduced by 3.03 percent.
o WY2008 to WY2014 conditions are based on historical data reduced by 3.03 percent.
• 2070 Climate Conditions:
o WY1995 to WY2003 conditions are based on the 2070-Level CALSIM Projection.
o WY2004 to WY2007 conditions are based on OCAP BO adjustment reduced by 8.09 percent.
o WY2008 to WY2014 conditions are based on historical data reduced by 8.09 percent.

Kern County Subbasin
Groundwater Sustainability Plan 9-75
Figure 9-20 graphically illustrates the total changes in SWP deliveries to the Kern Subbasin. The net result of the climate change modifications is that SWP deliveries to the Kern Subbasin for the Baseline scenario are 83 percent of historical; for the 2030 Climate scenario are 80 percent of historical; and for the 2070 scenario are 76 percent of historical.

Figure 9-21 shows the composite changes in total surface water supplies from the Kern River, CVP, and SWP. The net result of the climate change modifications is that Kern River, CVP, and SWP deliveries to the Kern Subbasin for the Baseline scenario are 93 percent of historical; for the 2030 Climate scenario are 88 percent of historical; and for the 2070 Climate scenario are 85 percent of historical.

Kern County Subbasin
Groundwater Sustainability Plan 9-76

Figure 9-18. Projected-Future - Water Supplies from the Kern River

Kern County Subbasin
Groundwater Sustainability Plan 9-77

Figure 9-19. Projected-Future Water Supplies from the Friant-Kern- Canal for the Federal Central Valley Project

Kern County Subbasin
Groundwater Sustainability Plan 9-78

Figure 9-20. Projected Future Water Supplies from the California Aqueduct for the State Water Project

Kern County Subbasin
Groundwater Sustainability Plan 9-79

Figure 9-21. Total Projected Future Water Supplies from Kern River, SWP, and Central Valley Project

Kern County Subbasin
Groundwater Sustainability Plan 9-80

9.6.3 Additional Surface Water Supply Adjustments

Within the Kern Subbasin, water users engage in complex real-time water trading and wheeling activities to maximize water utilization, minimize waste and energy consumption, and meet immediate water needs. It would be difficult to project future surface water deliveries in the Kern Subbasin without the use of a surface water allocation model that simulates these water trading and wheeling activities. Therefore, for this modeling effort, monthly future-scenario agricultural, urban and recharge deliveries from sources originating outside the Kern Subbasin have been estimated by adjusting historical deliveries by the ratio of (total scenario inflows)/(total historical inflows) for each month, where total inflows are the sum of CVP deliveries, SWP deliveries and Kern River at First Point. In addition, Kern River flows at First Point flows above historical flows under the 2030 Climate and 2070 Climate scenarios have been proportionally added to selected recharge deliveries. This method is deemed adequate for the Subbasin-level future scenario analyses.

Some future scenario data sets do not cover the entire historical water budget period from WY1995 through WY2014. In these cases, data from an analog historical period with similar water availability has been used to fill in the missing data. The analog years for each data type are summarized as:
• For CVP deliveries (CalSim-II data), WY1951 to WY1961 have been used as analogs for missing WY2004 to WY2014 data; these analog years have a similar distribution of water availability.
• Projected future Kern River at First Point flows for calendar years 1986, 1991, 1990, and 1961 have been used as analogs for missing calendar years 2011 through 2014; each of these analog years had a similar historical annual flow volume and monthly distribution.
• For climatic data adjustment factors, calendar years 1959 to 1961 have been used as analogs to missing calendar years 2012 to 2014.

9.6.4 Projected Water Budget Results

The C2VSimFG-Kern was run for three scenarios representing Baseline, 2030 Climate and 2070 Climate conditions, both with and without the proposed P/MAs for a total of six projected future scenarios.

C2VSimFG-Kern calculates water budget components each month of the simulation period for each future scenario. Projected future water budgets developed based on the C2VSimFG-Kern simulation results with the proposed P/MAs are then compared to  23 CCR § 354.18(c)(3)
 23 CCR § 354.18(d)(3)

 23 CCR § 354.18(d)(3)

Kern County Subbasin
Groundwater Sustainability Plan 9-81
results for the future scenarios without the P/MAs to assess how these changes enhance groundwater sustainability within the Kern Subbasin.

The average annual value of each water budget component summarizes the impacts over 50 years with current water demands. The water budget results for the six Projected scenarios are presented in Appendix H-1, Table 19 through 24, and include averages over three different periods, which include:
• WY2021 to WY2040 – Implementation Period representing the 20-year period required by the SGMA Regulations to implement P/MAs to achieve sustainability.
• WY2041 to WY2070 – Sustainability Period representing the 30-year hydrologic period following the Implementation Period to assess the long-term sustainability of the proposed P/MAs with variable climatic conditions including periods with above average rainfall and extended droughts. • WY2021 to WY2070 – Simulation Period representing the entire 50-year projected future hydrologic conditions.

Changes to surface water diversions under the proposed P/MAs include monthly increases or reductions to 37 model diversions and the addition of seven new diversions. Ten new groundwater pumping wells have been added to simulate a new groundwater pumping program. Agricultural land use has been converted to native vegetation in ten GSAs, and to urban land use in three GSAs. The P/MAs included in the C2VSimFG-Kern scenarios are described in Section 14.

Baseline simulation results indicate that the Kern Subbasin has an average annual overdraft over the Sustainability Period (WY2041 to WY2070) of 324,326 AFY. By implementing the proposed P/MAs, the Kern Subbasin is forecasted to achieve sustainability by 2040 with an estimated 42,144 AFY of annual surplus over the Sustainability Period. With adjustments to account for limitations in the simulation (discussed in Section 9.8.2), the adjusted change in storage increases to 85,578 AFY.

Hydrographs of the simulated groundwater levels showing the projected future change in groundwater levels relative to the MO and MT for each monitoring well are provided in Appendix H-3. A regional model such as C2VSimFG-Kern does not perfectly represent local groundwater levels; however, it does represent long-term changes in groundwater levels. Therefore, the hydrographs are presented showing the projected future change in groundwater levels for each monitoring well. This was done using the superposition method where the simulated groundwater elevation change is calculated relative to the simulated March 2015 groundwater levels from the model. This simulated change in groundwater levels is then applied to the measured March 2015 groundwater level at that monitoring location. The result was to superimpose the simulated change in groundwater levels from the projected future C2VSimFG-Kern scenarios relative to the measured March 2015 groundwater level. The superposition process provided a more

Kern County Subbasin
Groundwater Sustainability Plan 9-82
realistic projection of future groundwater elevations relative to the MO and MT to aid sustainability planning including the development of Projects and Management Actions (P/MAs).

Collectively, the C2VSimFG-Kern simulation results indicate that the currently proposed P/MAs, once fully implemented, provide a reasonable approach to achieve sustainable management of the Kern Subbasin and can be adaptively managed to meet future challenges, as necessary. A summary of each of the six projected future water budgets from C2VSimFG-Kern is provided below.

9.6.4.1 Baseline Condition Water Budgets
For the Baseline Scenario without SGMA Projects, the groundwater budget for WY2021 to WY2040 (Appendix H-1, Table 19) repeats the 20-year historical hydrologic period so it provides a direct comparison of the differences between the projected future Baseline without SGMA Projects and the historical condition. The primary difference between historical conditions and the projected future Baseline is a nearly 20 percent decrease in imported surface water deliveries primarily from the SWP due to the OCAP BO. Over this period, the average groundwater pumping is 1,581,000 AFY, which includes agricultural pumping, urban pumping, and exported water. This results in an additional loss of groundwater storage of about 50,000 AFY over the 50-year projected future Baseline period.

The Baseline Scenario with SGMA Projects simulates the P/MAs applied to the Baseline Scenario. No other changes were made except for the addition of the P/MAs to provide a direct comparison of the relative benefits of about 422,000 AFY of proposed P/MAs. The groundwater budget for the Baseline Scenario with SGMA Projects is provided in Appendix H-1, Table 20.

Comparing the groundwater budget for WY2041 to WY2070 (Appendix H-1, Table 20) with the same period from the Baseline Scenario (Appendix H-1, Table 19) provides an evaluation of groundwater conditions after the P/MAs have been fully implemented. As a result of implementing the P/MAs, total net aquifer inflows increase about 135,400 AFY. The total net aquifer outflows decrease about 231,100 AFY due mostly to decreased groundwater pumping with agricultural demand reduction management actions.

The change in groundwater storage for the Baseline Scenario with SGMA Projects improves by about 360,000 AFY compared to the Baseline Scenario without SGMA Projects. This change results in a net gain in groundwater in aquifer storage for WY2041 to WY2070 of about 42,100 AFY. A comparison of the annual change in groundwater storage over the 50-year hydrologic period is shown in Figure 9-22. The time series shows that change in groundwater storage has stabilized to slightly increasing over the period from WY2041 to WY2070.

Kern County Subbasin
Groundwater Sustainability Plan 9-83
A comparison of the average annual water budget components for the two different Baseline Scenarios is shown in Figure 9-23. Over WY2041 to WY2070, the average groundwater pumping of 1,354,000 AFY for the Baseline Scenario with SGMA Projects (which includes agricultural pumping, urban pumping, and exported water) is over 270,000 AFY less than in the Baseline Scenario.

9.6.4.2 2030 Climate Change Water Budgets
The 2030 Climate scenarios simulate how the Kern Subbasin responds assuming hydrologic conditions representing a potentially drier climate and are based on the DWR Climate Change Guidance and Resource Guide (DWR, 2018A and 2018B). The 2030 Climate scenarios were run both with and without SGMA projects. Results for these 2030 Climate scenarios are shown in Figure 9-24.

The groundwater budget for the 2030 Climate Scenario without SGMA Projects for WY2041 to WY2070 (Appendix H-1, Table 21) is compared the same period for the Baseline Scenario without SGMA Projects to assess the relative change due to the climate change assumptions. The results show a net increase in aquifer inflows of about 44,700 AFY, however, the aquifer net outflows increase by about 101,200 AFY. This is mostly attributed to the climate shift to earlier rainfall making more surface water available for water banking and conjunctive use projects during the winter but less available for irrigation in the summer, resulting in higher groundwater pumping. The net change in groundwater storage is an additional decline of about 56,600 AFY due to the climate change impacts.

The 2030 Climate Scenario with SGMA Projects simulates the proposed P/MAs (Section 14) applied to the 2030 climate change conditions. No other changes were made to this scenario. The groundwater budget for the 2030 Climate Scenario with SGMA Projects is provided in Appendix H-1, Table 22.

Comparing the groundwater budget for WY2041 to WY2070 (Appendix H-1, Table 21) between the two 2030 Climate Scenarios, the total net aquifer inflows increase about 118,700 AFY due to increased water banking and conjunctive use projects and deep percolation. The total net aquifer outflows decrease about 249,300 AFY due mostly to decreased groundwater pumping with agricultural demand reduction management actions.

Kern County Subbasin
Groundwater Sustainability Plan 9-84

Figure 9-22. Projected-Future Change in Groundwater Storage for Baseline Conditions

Kern County Subbasin
Groundwater Sustainability Plan 9-85

Figure 9-23. Baseline Projected Future Average Annual Groundwater Budget for WY2041 to 2070

Kern County Subbasin
Groundwater Sustainability Plan 9-86

Figure 9-24. 2030 Climate Projected Future- Average Annual Groundwater Budget for WY2041 to 2070

Kern County Subbasin
Groundwater Sustainability Plan 9-87
The change in groundwater storage for the 2030 Climate Scenario with SGMA Projects improves by about 368,000 AFY. This change results in a net decline in groundwater in aquifer storage over WY2041 to WY2070 of about 12,900 AFY. A comparison of the annual change in groundwater storage over the 50-year hydrologic period is shown in Figure 9-27. The time series shows that change in groundwater storage has stabilized to slightly increasing over the period from WY2041 to WY2070, but at a level below the results for the Baseline Scenario with SGMA Projects.

A comparison of the average annual water budget components for the two 2030 Climate Scenarios is shown in Figure 9-24. Over this period, the average groundwater pumping of 1,444,000 AFY for the 2030 Climate Scenario with SGMA Projects, which includes agricultural pumping, urban pumping and exported water, is over 290,000 AFY less than in the 2030 Climate Scenario without SGMA Projects.

9.6.4.3 2070 Climate Change Water Budgets
The 2070 Scenarios simulate how the Kern Subbasin aquifer would respond assuming hydrologic conditions representing a potentially very dry climate and are based on the DWR Climate Change Guidance (DWR, 2018A and 2018B). The 2070 Climate Change Scenarios were run both with and without SGMA Projects.

The groundwater budget for the 2070 Climate Scenario without SGMA Projects over WY2041 to WY2070 (Appendix H-1, Table 23) is compared the same period for the Baseline Scenario without SGMA Projects to assess the relative change due to the climate change assumptions. The results show a net increase in aquifer inflows of about 66,100 AFY, however, the net aquifer outflows increase by about 231,600 AFY. This is mostly attributed to an even greater climate shift to earlier rainfall making more surface water available for water banking and conjunctive use projects during the winter but less available for irrigation in the summer resulting in higher groundwater pumping. The net change in groundwater storage is an additional decline of about 165,500 AFY due to the climate change assumptions.

The 2070 Climate Scenario with SGMA Projects simulates the proposed P/MAs (Section 14) applied to the 2070 climate change conditions. No other changes were made to this scenario. The groundwater budget for the 2070 Climate Scenario with SGMA Projects is provided in Appendix H-1, Table 24. Comparing the groundwater budget for WY2041 to WY2070 (Appendix H-1, Table 23) between the two 2070 Climate Scenarios, the total net aquifer inflows increase about 106,300 AFY due to increased water banking and conjunctive use projects and deep percolation. The total net aquifer outflows decrease about 265,300 AFY due mostly to decreased groundwater pumping due to agricultural demand reduction management actions.

The change in groundwater storage for 2070 Climate Scenario with SGMA Projects improves by about 371,600 AFY. This change results in a net decline of groundwater in aquifer storage over WY2041 to WY2070 of about 118,300 AFY. A comparison of the annual change in groundwater storage over the 50-year hydrologic period is shown in

Kern County Subbasin
Groundwater Sustainability Plan 9-88
Figure 9-26. The time series shows that change in groundwater storage has stabilized to slightly increasing over the period from WY2041 to WY2070, but at a level below the results for the Baseline and 2030 Scenarios with SGMA Projects.

A comparison of the average annual water budget components for the two different 2070 Climate Scenarios is shown in Figure 9-25. Over this period, the average groundwater pumping of 1,559,000 AFY for the 2070 Climate Scenario with SGMA Projects, which includes agricultural pumping, urban pumping and exported water, is over 307,000 AFY less than in the 2070 Climate Scenario without SGMA Projects.

9.6.5 Change in Groundwater Storage

Groundwater sustainability for the Kern Subbasin was assessed using annual changes in groundwater storage. As discussed above, the decline in groundwater storage of the three future scenarios without P/MAs is significantly mitigated by the implementation of the proposed P/MAs. An assessment of the projected future groundwater storage change for the six projected future scenarios is summarized in Appendix H-1, Table 25.

The results of these simulations are summarized in Table 9-12.

Table 9-12. Summary of Simulated Change in Groundwater Storage Results over the 2041 to 2070 Sustainability Period
C2VSimFG-Kern Model Scenario
Change in
Groundwater
Storage (AFY)
Summary for All
Model Scenarios
Historic (WYs 1995-2014) -274,200
Current (WYs 2015-2023) -344,019
Baseline (WYs 2040-2070) -324,326
Baseline with Projects (WYs 2040-2070) 85,578
2030 Climate Change (WYs 2040-2070) -372,120
2030 Climate with Projects (WYs 2040-2070) 46,829
2070 Climate Change (WYs 2040-2070) -472,336
2070 Climate with Projects (WYs 2040-2070) -45,969

 23 CCR § 354.18(d)(3)

Kern County Subbasin
Groundwater Sustainability Plan 9-89

Figure 9-25. 2070 Climate Change Projected Future Average Annual Groundwater Budget for WY2041 to 2070

Kern County Subbasin
Groundwater Sustainability Plan 9-90

Figure 9-26. Projected Future Change in Groundwater Storage for all Conditions

Kern County Subbasin
Groundwater Sustainability Plan 9-91
These adjustments resulted in an overall improvement in the change in groundwater storage for the projected future water budgets. For the scenarios that include the SGMA Projects, the change in groundwater storage improves by 43,400 AFY (Baseline), 59,700 AFY (2030 Climate), and 72,300 AFY (2070 Climate). As a result of these adjustments, the adjusted change in groundwater storage for the three scenarios with SGMA Projects varied as follows:
• The Baseline Scenario with SGMA Projects changes from an increase of 42,100 AFY to an increase of 85,600 AFY.
• The 2030 Climate Scenario with SGMA Projects changes from a decline of 12,900 AFY to an increase of 46,800 AFY.
• The 2070 Climate Scenario with SGMA Projects changes from a decline of 118,000 AFY to a decline of 46,000 AFY.

These adjustments indicate areas of future improvement for C2VSimFG-Kern. Future updates to the model will address how to better simulate these conditions directly to limit the use of post-simulation adjustments.

9.7 Subbasin Sustainability Assessment

As defined by SGMA, the sustainable yield of a basin is the amount of groundwater that can be withdrawn annually without causing undesirable results. Although the SGMA Regulations require that a single value of sustainable yield must be calculated basin- wide, it should be noted that the sustainable yield can be changed with implementation of recharge projects, variations in climate, or changes in stream flow conditions. For the projected future scenarios, both the climate and the managed water supply operations are significantly affected which would lead to a change in the sustainable yield for the Kern Subbasin.

9.7.1 Sustainability Assessment
For the sustainability assessment, the sustainable yield was recalculated using the method described above, and the results are presented in Appendix H-1, Table 26.

Without the P/MAs, the percentage by which the total groundwater pumping exceeds the sustainable yield provides context to compare the significance of the level of groundwater pumping for the Kern Subbasin. For the scenarios without P/MAs, the groundwater pumping exceeds the sustainable yield on the order of 25 percent to 34 percent Appendix H-1, Table 26. However, with the proposed P/MAs, the groundwater pumping is less than the sustainable yield of the Kern Subbasin for the Baseline and 2030 climate scenarios and is within three percent of the sustainable yield for the 2070 Climate Scenario Appendix H-1, Table 23. This assessment indicates that the proposed P/MAs for the Kern Subbasin are of sufficient magnitude that, if fully  23 CCR § 354.18(d)(3)
C
ity of Bakersfield    D‐1  ‐
2025 Urban Water Management Plan
Appendix D:

Table 2‐2 from Kern River Flow and
Municipal Water Program EIR

City of Bakersfield 2. Program Description

Kern River Flow and Municipal Water Program
Draft Environmental Impact Report

2-25
June 2012

Table 2-2. City of Bakersfield Current Minimum Obligations and Kern River Yields

Quantity (TAF) Total
Annual
(TAF)

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
City Water Obligations
Water Treatment Plants 0.5 1.7 1.5 1.3 1.6 2 2.1 2.1 2 1.6 1.4 1 19 Kern River Canal & Irrigating Company (KRC&I) 0.05 0.15 0.45 0.8 1.05 1.10 1.10 1.10 0.73 0.30 0.15 0.03 7 Olcese Water District 0.02 0.05 0.08 0.10 0.12 0.13 0.13 0.13 0.13 0.08 0.03 0.02 1 City Water Feature Amenities (c) 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 5 Miller-Haggin Obligations + Isabella Evaporation
Losses, and Preexisting Delivery Obligations (b) 0 0 3.3 3.3 3.3 3.3 3.3 3.3 0 0 0 0 20 Long-Term Sale to Rosedale-Rio Bravo Water
Storage District 3.4 3.3 3.3 0 0 0 0 0 0 0 0 0 10
Current Minimum Obligations 4.4 5.6 9.1 5.9 6.5 7.0 7.1 7.1 3.3 2.4 2.0 1.5 62 Kern River Water Yield (1954–2010)
City Historic Rights(a)
Median Year 1.1 1.1 16.1 18.4 22.5 20.1 9.9 0.7 0 0 0.1 0.4 90 Average Year (mean) 1.5 1.7 17.1 19.7 28.3 25.2 14.2 5.9 0.4 0.3 0.4 1.1 116 Dry Year (25th percentile) 0.3 0.8 8.0 13.6 16.3 11.3 1.8 0 0 0 0 0 52 Wet Year (75th percentile) 1.4 1.3 24 24.8 36.4 31.9 19.9 11.4 0.9 0.7 0.8 1.1 155 Kern River Canal & Irrigating Company (KRC&I) Laterals
Median Year 0 0 0 0.8 3.5 2.5 0 0 0 0 0 0 7
Average Year (mean) 1.2 1.3 0.5 2 4.7 3.7 1.1 0.3 0.2 0 0.2 1 16 Dry Year (25th percentile) 0 0 0 0.1 1.3 0.4 0 0 0 0 0 0 2 Wet Year (75th percentile) 0.7 0.5 0.8 3.4 7.2 5.8 1.6 0 0 0 0 0 20 Old South Fork Right
Median Year 0.5 0.5 0 0.2 0.3 0.2 0.1 0 0 0 0.1 0.2 2
Average Year (mean) 0.4 0.4 0.1 0.2 0.3 0.3 0.2 0.1 0.2 0.2 0.2 0.3 3 Dry Year (25th percentile) 0.1 0.4 0 0.1 0.2 0.1 0 0 0 0 0 0 1 Wet Year (75th percentile) 0.6 0.6 0.1 0.3 0.3 0.3 0.2 0.1 0.5 0.3 0.4 0.6 4 Total Historic City Water Yield: Sum of City Base, KRC&I Laterals, and Old South Fork Deliveries Median Year 1.6 1.6 16.2 19.4 26.4 22.8 10 0.7 0.1 0 0.2 0.5 99 Average Year (mean) 3 3.5 17.7 21.9 33.3 29.2 15.5 6.4 0.8 0.5 0.8 2.4 135 Dry Year (25th percentile) 0.4 1.2 8 13.8 17.8 11.8 1.8 0 0 0 0 0.1 55 Wet Year (75th percentile) 2.7 2.3 24.9 28.5 44 38 21.7 11.6 1.4 1 1.2 1.7 179 City of Bakersfield 2. Program Description

Table 2-2. (continued) City of Bakersfield Current Minimum Obligations and Kern River Yields

Kern River Flow and Municipal Water Program
Draft Environmental Impact Report

2-26
June 2012

Quantity (TAF) Total
Annual
(TAF)

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Notes: TAF = thousand acre-feet
(a) Water deliveries do not include water released by other rights holders or the City of Bakersfield. (b) Miller-Haggin Obligations include river channel and canal recharge to make deliveries to first point canals below the Kern Island right and to deliver second point water and lower River water to second point undiminished during the March-August period. Preexisting delivery obligations are from agreements assumed by the City upon the City’s purchase of Kern River water rights. These include agreements with Kern County for Isabella Recreation Pool, Lake Ming, and Hart Park. Other year to year miscellaneous water sales are not included in the City Existing Water Obligations.
(c) City Water Feature Amenities = Truxtun Lakes, The Park at RiverWalk, Aera Park Pond, Wilson Ponds, etc.

Note: This table is reproduced in Chapter 3, Section 3.7 “Water Supply and Groundwater Resources” as Table 3.7-1

C
ity of Bakersfield    E‐1  ‐
2025 Urban Water Management Plan
Appendix E:

City of Bakersfield Municipal Code Chapters:
 Chapter 12.28 – Water in Gutters or Sidewalks
 Chapter 14.02 – Water Use Regulations
 Chapter 14.04 – City Domestic Water Service Area

12.28.010

12.28.020

12.28.030

12.28.040
Chapter 12.28

WATER IN GUTTERS OR SIDEWALKS
Sections:

Hose or water pipe on public way unlawful.

Water on sidewalks unlawful—Exception.

Allowing irrigation water to overflow into gutters unlawful.

Duty to turn off water before it overflows into gutters.

12.28.010 Hose or water pipe on public way unlawful.

Any person leaving or permitting to be left any hose or water pipe upon or across any sidewalk, sidewalk space or any public passageway, within the city, between the hours of nine p.m. and six a.m., shall be punished as set forth in general penalty provision Section 1.40.010. (Ord. 3434 § 1, 1996; prior code § 10.07.090)

12.28.020 Water on sidewalks unlawful—Exception.

Any person owning or having in his possession any water pipe, drain or hose and who permits the water therefrom to run across any sidewalk, public street or alleyway, so as to injure the same or obstruct or interfere with the free travel thereon, or who permits said water to run into or upon the surface of the street, shall be punished as set forth in general penalty provision Section 1.40.010, excepting, however, that it is not unlawful to use a reasonable amount of water to clean any sidewalk or portion thereof within the city. (Ord. 3434 § 2, 1996; prior code § 10.07.070)

12.28.030 Allowing irrigation water to overflow into gutters unlawful.

It is unlawful for the owner, agent or tenant of any dwelling house, apartment house, flat building or any building or premises in the city where water is used to irrigate or sprinkle the lawn or plants on or about said premises to allow the water so being used to run, or for such person to sprinkle said premises until the water floods the parking space between the sidewalk and the curb and overflows into the gutter and street. (Prior code § 8.56.010)

12.28.040 Duty to turn off water before it overflows into gutters.

It shall be the duty of all owners, agents or tenants of dwelling houses, apartment houses, flat buildings and all such premises where water is used to irrigate or sprinkle the lawn and plants on or about said premises, to shut or Ch. 12.28 Water in Gutters or Sidewalks | Bakersfield Municipal Code Page 1 of 2 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

Disclaimer: The city clerk has the official version of the Bakersfield Municipal Code. Users should contact the city clerk for ordinances passed subsequent to the ordinance cited above.

City Website: www.bakersfieldcity.us
City Telephone: (661) 326-3000
Hosted by General Code.
turn off all water before the same runs over the curb in front of said premises and into the gutter and street. (Prior code § 8.56.020)
Ch. 12.28 Water in Gutters or Sidewalks | Bakersfield Municipal Code Page 2 of 2 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

14.02.010

14.02.020

14.02.030

14.02.035

14.02.040

14.02.045
Chapter 14.02

WATER USE REGULATIONS
Sections:

Outside irrigation restrictions.

Penalty.

Administrative citations.

Administrative fines.

Administrative citation review process.

Administrative hearing officer.

14.02.010 Outside irrigation restrictions.

A. Outside irrigation of ornamental landscapes or turf with potable water is allowed in accordance with the rules and regulations promulgated by the State Water Resources Control Board relative to water usage.

B. Outside irrigation in a manner that causes water to flow onto adjacent property, nonirrigated areas, sidewalks, and/or gutters is strictly prohibited.

C. Outside irrigation is advised to be done after six p.m. and before nine a.m. for optimal efficiency.

D. In addition to the above, commercial, industrial, and institutional properties, such as campuses, golf courses, and cemeteries, shall immediately implement water efficiency measures to reduce potable water usage in an amount consistent with the reduction targets of the State Water Resources Control Board as amended from time to time.

E. All irrigation and landscaping projects shall adhere to that certain Model Water Efficient Landscaping Ordinance known and designated as California Code of Regulations, Title 23, Chapter 2.7 as adopted by the state and as pursuant to Chapter 17.61 of this code, Landscape Standards. (Ord. 5035 § 1, 2020; Ord. 4915 § 1, 2017; Ord. 4830 § 1, 2015; Ord. 4804 § 2, 2015)

14.02.020 Penalty.

Failure to comply with these regulations may be punishable as an infraction, or misdemeanor pursuant to Bakersfield Municipal Code Section 1.40.010, an administrative citation pursuant to Bakersfield Municipal Code Section 14.02.030, or any other available remedies allowed by law. (Ord. 4830 § 1, 2015; Ord. 4804 § 2, 2015) Ch. 14.02 Water Use Regulations | Bakersfield Municipal Code Page 1 of 4 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

14.02.030 Administrative citations.

A. Whenever an enforcement officer charged with the enforcement of this chapter determines that a violation of a provision has occurred, the enforcement officer shall have the authority to issue an administrative citation to any person responsible for the violation. Said enforcement officer shall be a trained city agent or their designee.

B. Each administrative citation shall contain the following information:

1. The date of the violation or, if the date of the violation is unknown, then the date the violation is identified;

2. The address or a definite description of the location where the violation occurred;

3. The section of the code violated and a description of the violation;

4. The amount of the fine and how to pay it;

5. A description of the administrative citation review process;

6. An order prohibiting the continuation or repeated occurrence of the code violation described in the administrative citation; and

7. The name and signature of the citing enforcement officer.

C. The fine shall be paid to the city within thirty days from the date of the administrative citation; payment of a fine under this section shall not excuse or discharge any continuation or repeated occurrence of the code violation that is the subject of the administrative citation.

D. The city may collect any past due administrative citation fine by use of all available legal means. (Ord. 5102 § 1, 2022; Ord. 4830 § 1, 2015)

14.02.035 Administrative fines.

A. The fines for violation of this chapter shall be as follows:

1. Fifty dollars for the first offense, one hundred fifty dollars for the second offense, and two hundred fifty dollars to one thousand dollars for each subsequent offense in a calendar year.

B. Any administrative citation fine paid pursuant to subsection A shall be refunded if it is determined, after a hearing, that the person charged in the administrative citation was not responsible for the violation or that there was no violation as charged in the administrative citation. (Ord. 4830 § 1, 2015) Ch. 14.02 Water Use Regulations | Bakersfield Municipal Code Page 2 of 4 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

14.02.040 Administrative citation review process.

Any recipient of an administrative citation may appeal the citation by completing a request for hearing form and returning it to the city within thirty days from the date of the administrative citation, together with an advance deposit of the fine.

A. No appeal hearing to contest an administrative citation shall be held unless the fine has been deposited in advance.

B. An appeal hearing shall be set for a date that is not less than fifteen days and not more than sixty days from the date that the request for hearing is filed.

C. The appellant shall be notified of the time and place set for the hearing at least ten calendar days prior to the date of the hearing.

D. At the hearing, the appellant shall have the opportunity to testify and to present evidence concerning the administrative citation.

E. The failure of the appellant to appear at the appeal hearing shall constitute a forfeiture of the fine and a failure to exhaust their administrative remedies.

F. The administrative citation and any additional report submitted by the enforcement officer shall constitute prima facie evidence of the respective facts contained in those documents.

G. The hearing officer may continue the hearing and/or request additional information from the enforcement officer or the recipient of the administrative citation prior to issuing a written decision.

H. Any person aggrieved by an administrative decision of a hearing officer on an administrative citation appeal may obtain review of the administrative decision by filing a petition for review with the Kern County Superior Court in accordance with the timelines and provisions set forth in California Government Code Section 53069.4. (Ord. 4830 § 1, 2015)

14.02.045 Administrative hearing officer.

The city manager shall designate the hearing officer for the appeal hearing.

A. After considering all of the testimony and evidence submitted at the appeal hearing, the hearing officer shall issue a written decision to uphold or dismiss the administrative citation and shall list in the decision the reasons for that decision. The decision of the hearing officer shall be final.

B. If the hearing officer determines that the administrative citation should be upheld, the hearing officer may increase or decrease the fine amount. The appellant must pay the city any increased amount within thirty days of receiving the decision of the hearing officer.

Ch. 14.02 Water Use Regulations | Bakersfield Municipal Code Page 3 of 4 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

Disclaimer: The city clerk has the official version of the Bakersfield Municipal Code. Users should contact the city clerk for ordinances passed subsequent to the ordinance cited above.

City Website: www.bakersfieldcity.us
City Telephone: (661) 326-3000
Hosted by General Code.

C. If the hearing officer determines that the administrative citation should be dismissed or the fine reduced, the city shall refund the appropriate amount of the deposited fine within thirty days.

D. The employment, performance evaluation, compensation and benefits of the hearing officer shall not be directly or indirectly conditioned upon the amount of administrative citation fines upheld by the hearing officer. (Ord. 4830 § 1, 2015)
Ch. 14.02 Water Use Regulations | Bakersfield Municipal Code Page 4 of 4 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

14.04.010

14.04.011

14.04.020

14.04.030

14.04.040

14.04.050

14.04.060

14.04.070

14.04.080

14.04.090

14.04.100

14.04.110

14.04.120

14.04.130

14.04.140

14.04.150

14.04.160

14.04.170

14.04.180

14.04.190

14.04.200

14.04.210

14.04.220

14.04.230

14.04.240

14.04.250

14.04.260

14.04.270

14.04.280

14.04.290
Chapter 14.04

CITY DOMESTIC WATER SERVICE AREA
Sections:

Definitions.

Establishment of city domestic water service area.

Description of service.

Application for service.

Contracts.

Reserved.

Reserved.

Reserved.

Reserved.

Reserved.

Reserved.

Reserved.

Rates and fees.

Reserved.

Reserved.

Reserved.

Reserved.

Reserved.

Reserved.

Reserved.

Reserved.

Reserved.

Reserved.

Reserved.

Service connections, meters and customers’ facilities—Installation.

Service connections, meters and customers’ facilities—Ownership.

Service connections, meters and customers’ facilities—Installation and maintenance responsibility.

Service connections, meters and customers’ facilities—Right of access to customers’ premises.

Service connections, meters and customers’ facilities—Compensation to city’s employees.

Ch. 14.04 City Domestic Water Service Area | Bakersfield Municipal Code Page 1 of 12 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

14.04.300

14.04.310

14.04.320

14.04.330

14.04.340
Service connections, meters and customers’ facilities—Responsibility for loss or damage.

Service connections, meters and customers’ facilities—Water wastage.

Service connections, meters and customers’ facilities—Customers’ responsibilities precedent to receiving service.

Service connections, meters and customers’ facilities—Ground wire attachments.

Meter tests and adjustment of bills.

Service to separate premises and multiple units—Resale of water.

14.04.010 Definitions.

For the purposes of this chapter, the following words shall have the meanings as set forth in this section:

A. “Applicant” means the person, corporation, partnership or other agency applying for water service.

B. “Business service” means provision of water for use in connection with commercial premises devoted primarily to operations for profit including offices, stores, markets, apartments, hotels, motels, automobile trailer parks or courts, service stations and the like.

C. “City” means the city and department of water, or California Water Service Company, agent.

D. “Customer” means any person, association, corporation, partnership or other agency of record supplied with water service from the city.

E. “Date of presentation” means the date upon which a bill or notice is mailed or delivered by the city to the customer.

F. “Industrial service” means provision of water to industrial premises where the water is used primarily in manufacturing or processing activities.

G. “Irrigation service” means provision of water for commercial agriculture, floracultural or horticultural use and billed under distinct irrigation rates.

H. “Main extensions” means the extension of water distribution mains beyond existing facilities in accordance with the provisions of the rule applicable to main extensions filed as part of these tariff schedules.

I. “Metered service” means service for which the charges are computed on the basis of measured quantities of water.

J. “Premises” means the integral property or area, including improvements thereon, to which water service is, or is to be, provided.

K. “Rates” means the rate or charge for water use.

Ch. 14.04 City Domestic Water Service Area | Bakersfield Municipal Code Page 2 of 12 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

L. “Residential service” means provision of water for household purposes, including water used on the premises for sprinkling lawns, gardens and shrubbery; washing vehicles; and other similar and customary purposes pertaining to single-family or multiple-family dwelling.

M. “Service connection” means service pipe and meter (where applicable) from the distribution pipeline to the nearest curb or property line adjacent to a dedicated public street or to a public utility easement available for use by the city.

N. “Service pipe” means the connection between the city’s mains and the service connection, including all of the pipe, fittings and valves necessary to make the connection. (Prior code § 1.46.010)

14.04.011 Establishment of city domestic water service area.

There is established the city domestic water service area, the boundaries and service area of which shall be determined by the council by resolution, which resolution may be amended from time to time. (Ord. 4750 § 2, 2013; Ord. 2997 § 1, 1985)

14.04.020 Description of service.

A. Quantities. The city will endeavor to supply water dependably and safely in adequate quantities to meet the reasonable needs and requirements of customers.

B. Pressures. The city will endeavor to maintain normal operating pressures of not less than forty pounds per square inch nor more than one hundred twenty-five pounds per square inch at the service connection, except that during periods of hourly maximum demand the pressure at the time of peak seasonal loads may not be less than thirty pounds per square inch and that during periods of hourly minimum demand the pressure may not be more than one hundred fifty pounds per square inch. Variations in pressure under normal operation will not exceed fifty percent of the average operating pressure. (The average operating pressure will be determined by computing the arithmetical average of at least twenty-four consecutive hourly pressure readings.) C. Quality. Whenever furnished for human consumption or for domestic uses, the city will endeavor to provide water that is wholesome, potable, in no way harmful or dangerous to health, and, insofar as practicable, free from objectionable odors, taste, color and turbidity.

D. Nonliability. The city shall not be liable for injury or damage to either persons or property resulting from failure to supply either adequate quantity, quality or pressure of the water supplied pursuant to these rules or pursuant to any contract hereunder. Acceptance of service by any customer shall constitute waiver of such liability. (Ord. 2660 § 2, 1981; prior code § 1.46.020) Ch. 14.04 City Domestic Water Service Area | Bakersfield Municipal Code Page 3 of 12 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

14.04.030 Application for service.

A. Application for Service.

1. All persons, corporations, partnerships, agencies or entities of every type or kind shall make an application for water service on a form provided by the city.

2. The application is merely a written request for service and does not bind the applicant to take service for a period of time longer than that upon which the rates and minimum charge of the applicable rate schedule are based; neither does it bind the city to serve, except under reasonable conditions.

B. Individual Liability for Joint Service. Two or more parties who join in one application for service shall be jointly and severally liable for payment of bills and shall be billed by means of single periodic bills.

C. Change in Customer’s Equipment. Customers making any material change in the size, character or extent of the utilizing equipment or operations for which the city is supplying water service shall immediately give the city written notice of the extent and nature of the change.

D. Use of Water Without Application for Service Having Been Made. Any person or firm taking possession of and using water without having made application to the city for service shall be held liable for the full amount of the service rendered.

E. No application for water connection to the city-owned system shall be approved for an unincorporated area, other than the Fairhaven area, after the effective date of the ordinance codified in this section. (Ord. 5103 § 1, 2022; Ord. 5036 § 1, 2020; Ord. 4084 §§ 3, 4, 2002; Ord. 3560 § 1, 1993; Ord. 3504 § 1, 1992; prior code § 1.46.030)

14.04.040 Contracts.

A contract, as a condition precedent to receiving service from the city, will be required under any of the following circumstances:

A. Where required by provisions in a filed rate schedule; B. When a main extension to be made under the provisions of Sections 14.04.140 through 14.04.230 requires an advance for construction;
C. For temporary service supplied under the provisions of Section 14.04.130; D. For standby service or service requiring the payment of an availability fee; E. For any service to be furnished at rates or under conditions other than the rates set by the city; F. Under any circumstances where a contract would benefit the city and is directed to be prepared by the director of water resources. (Ord. 3504 § 2, 1992; prior code § 1.46.040) Ch. 14.04 City Domestic Water Service Area | Bakersfield Municipal Code Page 4 of 12 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

14.04.050 Reserved.
(Ord. 5103 § 2, 2022; Ord. 4564 § 1, 2009; Ord. 2585 § 1, 1980; prior code § 1.46.050)

14.04.060 Reserved.
(Ord. 5103 § 3, 2022; prior code § 1.46.060)

14.04.070 Reserved.
(Ord. 5103 § 4, 2022; prior code § 1.46.070)

14.04.080 Reserved.
(Ord. 5103 § 5, 2022; prior code § 1.46.080)

14.04.090 Reserved.
(Ord. 5103 § 6, 2022; prior code § 1.46.090)

14.04.100 Reserved.
(Ord. 5103 § 7, 2022; Ord. 4564 § 2, 2009; prior code § 1.46.100)

14.04.110 Reserved.
(Ord. 5103 § 8, 2022; Ord. 3939 § 5, 1999; Ord. 3783 § 4, 1997; Ord. 3604 § 1, 1994; prior code § 1.46.110)

14.04.120 Rates and fees.

A. Monthly Rates and Fees. The city water board, with concurrence of the city council, shall establish monthly rates and fees for water usage. The monthly fee consists of two components: the “readiness to serve fee” which is a flat rate for all customers based on the size of connection and a “quantity unit rates” based on the quantity of Ch. 14.04 City Domestic Water Service Area | Bakersfield Municipal Code Page 5 of 12 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026. water used. A complete schedule of all rates and fees authorized to be charged for water service shall be kept in the city’s local offices where they will be available for public inspection.

B. Availability Fees. Notwithstanding agreements otherwise, the city water board, with concurrence of the city council, shall establish availability fees for water service facilities required to enable development of all areas served by the city water system. Such fees are declared to be necessary to compensate the city for the expense incurred in furnishing source, storage, and water distribution facilities, and related capital project expenses, including, but not limited to, costs of acquisition and financing and necessary costs of operation, maintenance, replacement, improvement and extension of the water system.

Each fiscal year, the water department shall submit to the water board a proposed availability fee schedule. The availability fee shall be adjusted annually by the Construction Cost Index defined in Bakersfield Municipal Code Section 15.84.030. Also, the fee schedule shall be further adjusted to reflect all city expenses incurred as set forth in the previous paragraph. The fee shall be adopted by resolution of the city council following a noticed public hearing.

C. All applicants for service where availability fees are to be paid shall sign a domestic water service contract.

The required fee must be paid at the first occurrence of either the issuance of a building permit or the recordation of a final map. No final map allowing construction shall be recorded nor any building permit issued prior to payment of proper fees for water service. (Ord. 5103 § 9, 2022; Ord. 4732 § 1, 2013; Ord. 4344 § 1, 2006; Ord. 3504 § 3, 1992; Ord. 2660 § 3, 1981; prior code § 1.46.120)
Ch. 14.04 City Domestic Water Service Area | Bakersfield Municipal Code Page 6 of 12 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

14.04.130 Reserved.
(Ord. 5104 § 1, 2022; prior code § 1.46.130)

14.04.140 Reserved.
(Ord. 5104 § 2, 2022; prior code § 1.46.140(a)(1))

14.04.150 Reserved.
(Ord. 5104 § 3, 2022; prior code § 1.46.140(a)(2))

14.04.160 Reserved.
(Ord. 5104 § 4, 2022; prior code § 1.46.140(a)(3))

14.04.170 Reserved.
(Ord. 5104 § 5, 2022; prior code § 1.46.140(a)(4))

14.04.180 Reserved.
(Ord. 5104 § 6, 2022; prior code § 1.46.140(a)(5))

14.04.190 Reserved.
(Ord. 5104 § 7, 2022; prior code § 1.46.140(a)(6))

14.04.200 Reserved.
(Ord. 5104 § 8, 2022; prior code § 1.46.140(b)(1))
Ch. 14.04 City Domestic Water Service Area | Bakersfield Municipal Code Page 7 of 12 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

14.04.210 Reserved.
(Ord. 5104 § 9, 2022; prior code § 1.46.140(b)(2))

14.04.220 Reserved.
(Ord. 5104 § 10, 2022; prior code § 1.46.140(b)(3))

14.04.230 Reserved.
(Ord. 5104 § 11, 2022; prior code § 1.46.140(c))

14.04.240 Service connections, meters and customers’
facilities—Installation.

A. Service Connections.

1. Only contractors duly authorized by the city will be permitted to install a service connection from the city’s main to the customer’s premises.

B. Meters.

1. Meters, where authorized, will be installed by the city at the customer’s expense, unless otherwise provided in the rules and schedule of rates.

2. Where a meter and other facilities, including housings and connections, are located on a customer’s premises, no rent or other charge will be paid by the city therefor.

3. All meters will be sealed by the city at the time of installation, and no seal shall be altered or broken except by one of its authorized employees or agents.

C. Dual Water Supply—Protective Devices. Whenever there is present upon any customer’s premises a water supply which has not been approved by the Department of Public Health of the state as safe and potable for human use, or the customer is engaged upon the premises in industrial processes using or producing process water or liquid industrial waste or in the handling of sewage or any other dangerous substance, the city may refuse or discontinue service until there has been installed at the expense of the customer upon the customer’s premises a suitable protective device approved by the Department of Public Health to protect against backflow of water from the customer’s premises into the city’s system. Such protective device shall be installed in a manner approved by the city and in a location in which it is readily available to the city for periodic inspection. It shall be Ch. 14.04 City Domestic Water Service Area | Bakersfield Municipal Code Page 8 of 12 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026. the customer’s responsibility at his or her own expense to maintain such protective device in a reliable and safe operating condition at all times.

D. Pumps and Boosters. When a customer receiving service at the city’s main or service connection must by means of a pump of any kind elevate or increase the pressure of the water received, the pump shall not be attached to any pipe directly connected to the city’s main or service pipe. A customer, whose operation requires the use of a quick-opening or quick-closing valve must operate such device from a tank, cistern, sump or other facility which may be served by but not directly connected with the city’s distribution mains or service pipes.

E. Automatic Valves. Quick-closing or quick-opening valves shall not be installed on customer’s pipes which are directly attached to the city’s mains or service pipes. A customer whose operation requires the use of a quick- opening or quick-closing valve must operate such device from a tank, cistern, sump or other facility which may be served by but not directly connected with the city’s distribution mains or service pipes. (Ord. 5104 § 12, 2022; Ord. 4750 § 3, 2013; Ord. 4632 § 1, 2010; Ord. 2660 § 4, 1981; prior code § 1.46.150(a))

14.04.250 Service connections, meters and customers’
facilities—Ownership.

The service connections, meters, and other facilities furnished by the city at the customer’s expense and located wholly or partially upon a customer’s premises are and shall remain the property of the city, which has the right to repair, replace and remove upon discontinuance of service. (Ord. 2660 § 5, 1981; prior code § 1.46.150(b))

14.04.260 Service connections, meters and customers’
facilities—Installation and maintenance responsibility.

The city will not be responsible for the installation and maintenance of the water pipelines beyond the end of the city’s service connection or meter. (Prior code § 1.46.150(c))

14.04.270 Service connections, meters and customers’ facilities—Right of access to customers’ premises.

A. The city or its duly authorized agents shall at all reasonable times have the right of ingress to and egress from the customer’s premises for any purpose properly connected with the service of water to the customer.

B. Any inspection work or recommendations made by the city or its agents in connection with plumbing or appliances or any use of water on the customer’s premises, either as a result of a complaint or otherwise, will be made without charge and without assumption of any liability in connection therewith. (Prior code § 1.46.150(d)) Ch. 14.04 City Domestic Water Service Area | Bakersfield Municipal Code Page 9 of 12 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

14.04.280 Service connections, meters and customers’
facilities—Compensation to city’s employees.

All inspectors, agents and employees of the city are strictly forbidden to demand or accept any personal compensation from a customer for services rendered. (Prior code § 1.46.150(e))

14.04.290 Service connections, meters and customers’
facilities—Responsibility for loss or damage.

A. The city will not be responsible for any loss or damage caused by any negligence or wrongful act of a customer or his authorized representatives in installing, maintaining, operating or using any or all appliances, facilities or equipment for which water service is supplied.

B. The customer will be held responsible for damage to the city’s meters and other property resulting from the use or operating of appliances and facilities on the customer’s premises, including damage caused by steam, hot water, chemicals, etc., or from an act of the customer. (Prior code § 1.46.150(f))

14.04.300 Service connections, meters and customers’ facilities—Water wastage.

Where negligent or wasteful use of water exists on a customer’s premises, the city may discontinue the service if such conditions are not corrected within a reasonable time after giving customer written notice of intent to do so. (Ord. 5104 § 13, 2022; prior code § 1.46.150(g))

14.04.310 Service connections, meters and customers’
facilities—Customers’ responsibilities precedent to receiving service.

The customer, as a condition precedent to receiving service shall:

A. Furnish, install, and maintain in good repair necessary piping and facilities to make the connection from the city’s service connection to the place of consumption;
B. Provide a main valve between the city’s service connection and the point of use; C. Consult the city prior to installation and secure its approval of the location on the curbline or property line at which connection to the city’s service connection shall be made. (Prior code § 1.46.150(h)) Ch. 14.04 City Domestic Water Service Area | Bakersfield Municipal Code Page 10 of 12 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

14.04.320 Service connections, meters and customers’ facilities—Ground wire attachments.

All persons, firms, or corporations are forbidden to attach any ground wire to any plumbing which is or may be connected to any service connection or main belonging to the city, and the city will hold the customer liable for any damage to its property occasioned by any such ground wire which is now or may hereafter be attached. (Prior code § 1.46.150(i))

14.04.330 Meter tests and adjustment of bills.

A. Tests.

1. Prior to Installation. Every meter will be tested prior to being installed and no meter will be placed in service if found to register more than two percent fast or slow.

2. On Customer Request. A customer may request a meter test which may be subject to an administrative fee.

B. Adjustment of Bills for Meter Error.

1. Fast Meters. When, upon test, the average meter error is found to be more than two percent fast, the city will refund to the customer the amount of the overcharge based on corrected meter readings for the period the meter was in use but not exceeding three months.

2. Slow Meters.
a. When, upon test, a meter used for commercial (residential and business) service is found to be registering more than twenty-five percent slow, the city may bill the customer for the amount of the undercharge based upon corrected meter readings for the period the meter was in service but not exceeding three months.
b. When, upon test, a meter used for other than commercial service is found to be registering more than five percent slow, the city may bill the customer for the amount of the undercharge based upon corrected meter readings for the period the meter was in service but not exceeding three months.

3. Nonregistering Meters. The city may bill the customer for water consumed while the meter was nonregistering but for a period not exceeding three months at the minimum monthly meter rate, or upon an estimate of the consumption based upon the customer’s prior use during the same season of the year if conditions were unchanged, or upon an estimate based upon a reasonable comparison with the use of other customers during the same period, receiving the same class of service under similar circumstances and conditions.

Ch. 14.04 City Domestic Water Service Area | Bakersfield Municipal Code Page 11 of 12 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

Disclaimer: The city clerk has the official version of the Bakersfield Municipal Code. Users should contact the city clerk for ordinances passed subsequent to the ordinance cited above.

City Website: www.bakersfieldcity.us
City Telephone: (661) 326-3000
Hosted by General Code.

4. General. When it is found that the error in a meter is due to some cause, the date of which can be fixed, the overcharge or the undercharge will be computed back to but not beyond such date. (Ord. 5104 § 14, 2022; prior code § 1.46.160)

14.04.340 Service to separate premises and multiple units—Resale of water.

A. Number of Services to Separate Premises. Separate premises under single control or management will be supplied through separate individual service pipes unless the city elects otherwise.

B. Service to Multiple Units on Same Premises. Separate houses, buildings, living or business quarters on the same premises or on adjoining premises, under a single control or management, may be served by either of the following methods:

1. Through separate service pipes to each unit; provided, that the piping system from each service is independent of the others and is not interconnected;

2. Through a single service pipe to supply the entire premises, in which case only one minimum or readiness-to-serve charge will be applied. The responsibility for payment of charges for all service furnished to combined units through a single service pipe, in accordance with this chapter, must be assumed by the applicant.

C. Resale of Water. Except by special agreement with the city, no customer shall resell any of the water received from the city nor shall such water be delivered to premises other than those specified in such customer’s application for service. (Prior code § 1.46.170)
Ch. 14.04 City Domestic Water Service Area | Bakersfield Municipal Code Page 12 of 12 The Bakersfield Municipal Code is current through Ordinance 5214, passed April 8, 2026.

C
ity of Bakersfield    F‐1  ‐
2025 Urban Water Management Plan
Appendix F:

Water Shortage Contingency Plan

Final Draft 2025 Bakersfield WSCP Page 1 of 10
City of Bakersfield
Water Shortage Contingency Plan
Final Draft – August 2026

Introduction
This Water Shortage Contingency Plan (WSCP) for the City of Bakersfield (City) has been prepared in accordance with current Water Code requirements and outlines a program for responding to water supply limitations. The intent of the water conservation measures and progressive restrictions on water use identified in this WSCP is to provide guidance to the City in managing and mitigating anticipated water supply shortages. The structured steps are designed to allow the City to assess its available water supplies and implement appropriate measures in response to actual conditions so that water shortages can be managed efficiently, predictably, and with accountability.

This WSCP includes the following elements as required by the Water Code:

1. Water Supply Reliability Analysis

2. Annual Water Supply and Demand Assessment Procedures

3. Six Standard Water Shortage Levels

4. Shortage Response Actions

5. Communication Protocols

6. Compliance and Enforcement (Municipal Water System service area only)

7. Legal Authorities

8. Financial Consequences of WSCP

9. Monitoring and Reporting (Municipal Water System service area only)

10. WSCP Refinement Procedures (Municipal Water System service area only)

11. Special Water Feature Distinction (Municipal Water System service area only)

12. Plan Adoption, Submittal and Availability

All of the above elements apply to the Municipal Water System service area. The elements shown as “Municipal Water System service area only” are not applicable to the Wholesale Water System service area.

A water shortage condition is defined as when available water supplies are insufficient to meet the normally expected customer demands. Water shortage conditions may be a result of population growth, climate change, drought, catastrophic events, or other water shortage emergencies declared by either the City, County, State or Federal government.

The six standard water shortage levels and response actions defined in this WSCP increase restrictions on water use in response to the increasing levels of water shortage conditions. Other than response actions specified as applicable to the Wholesale Water System service area, t he implementation of response actions within this WSCP apply directly to the Municipal Water System service area. The retail agencies within the City’s Wholesale Water System service area are responsible for the implementation and enforcement of restrictions and prohibitions at the retail level within their respective service areas.

Each of the required elements is addressed in the following sections.

Final Draft 2025 Bakersfield WSCP Page 2 of 10

1. Water Supply Reliability Analysis
The City’s 2025 Urban Water Management Plan (2025 UWMP) update includes a water supply reliability analysis and drought risk assessment which are summarized herein. The City’s Wholesale Water System replenishes its Kern River supplies to the groundwater basin for the benefit of retail water suppliers providing service to City areas through their respective groundwater wells. The Kern River Groundwater Sustainability Agency (KRGSA) Groundwater Sustainability Plan (GSP) includes implementation of projects and management actions including the City’s conjunctive use optimization project and proposed expansion of its recycled water use which are anticipated to provide additional water supplies for the benefit of the groundwater basin. The Municipal Water System and other retail water suppliers within the Wholesale Water System service area are able to increase use of their groundwater wells during years of reduced Kern River supplies.

The Municipal Water System service area relies significantly on groundwater pumping to meet its demands. With implementation of the projects and management actions identified in the KRGSA GSP, the City’s groundwater supplies are anticipated to be sustainable and available to meet the projected demands of its Municipal Water System service area. The KRGSA GSP identifies sustainable management criteria for water levels based on the historic low water levels experienced in 2015- 2016.

Maintaining water levels above the Minimum Threshold levels identified in the KRGSA GSP is anticipated to allow the City’s wells to meet the demands of the Municipal Water System while minimizing undesirable results such as declining pump capacity, well inefficiency, water levels falling below pump intakes and pump screens, and degraded water quality.

As population and water demands increase with the Municipal Water System service area, the City will construct new wells required to meet the increased demands. Groundwater wells will be equipped with wellhead treatment as necessary to remove contaminants such as arsenic, 1,2,3-Trichloropropane (TCP), and Perfluorooctane Sulfonate (PFOS) that exceed water quality standards. When State Water Project (SWP) supplies are not available from Kern County Water Agency (KCWA) Improvement District No. 4 (ID4), the City is able to deliver its Kern River water to KCWA ID4 for treatment in place of SWP supplies.

The Drought Risk Assessment in the 2025 UWMP update evaluates the reliability of the Municipal Water System’s water supplies to meet drought conditions for 2025 and a subsequent five year period. The Drought Risk Assessment indicates that although the Municipal Water System’s water supplies are anticipated to be adequate to meet drought conditions during this period, it is assumed that water supplies and water use are reduced by 10 percent in the third through fifth dry years as a result of water conservation measures expected to be implemented during an extended drought period. T he reduction in demands will be accomplished by implementation of the appropriate Shortage Level and associated response actions in this WSCP.

A catastrophic event may result in a significant loss of City water supplies for a temporary period lasting from a day to a week or more. Examples of catastrophic events include earthquake, widespread power outage or other disaster. The WSCP shortage levels and response actions are intended to be implemented as appropriate to any future water shortage condition.

2. Annual Water Supply and Demand Assessment Procedures The Water Department Director will conduct an annual assessment of the City’s water supplies and demands and prepare an Annual Water Shortage Assessment Report (Annual Assessment Report) for both the Municipal Water System and Wholesale Water System considering the following:

Final Draft 2025 Bakersfield WSCP Page 3 of 10
• Current year unconstrained demand (considering weather, growth, and other influencing factors, such as policies to manage current supplies to meet demand objectives in future years, as applicable),
• Current year available supply (considering hydrological and regulatory conditions in the current year and one dry year),
• Existing infrastructure capabilities and plausible constraints, • A defined set of locally applicable evaluation criteria that are consistently relied upon for each annual water supply and demand assessment, and
• A description and quantification of each source of water supply.

The Annual Water Supply and Demand Assessment (AWSDA) will be completed and submitted to Department of Water Resources (DWR) prior to July 1 of each year per Water Code requirements.

If water shortage conditions requiring declaration of a Water Shortage Level 2 or higher are anticipated, the Annual Assessment Reports shall be submitted to the City Council for approval. The Annual Assessment Report for Water Shortage Level 2 or higher water shortage conditions will set for the criteria for determining when the particular Water Shortage Level is to be implemented and terminated as well as the appropriate shortage response actions, compliance and enforcement actions, and communications protocols consistent with the WSCP.

3. Six Standard Water Shortage Levels
As the water purveyor, the City must provide the minimum health and safety water needs of the Municipal Water System service area at all times. Implementation of this WSCP prioritizes water use as follows:

1. Health and safety – interior residential water use and fire suppression.

2. Commercial, Industrial, and Governmental – jobs and economic base.

3. Landscaping – residential, business/commercial, parks.

4. New Demand – all projects.

The six standard water shortage levels are defined by the State to allow for increasing levels of water conservation measures in response increasing severity of water shortage.

The applicable water shortage Level and response actions will depend on the causes, severity, and anticipated duration of the water supply shortage. The Six Standard Water Shortage Levels for both the Municipal Water System and the Wholesale Water System are summarized in Table 1.

Final Draft 2025 Bakersfield WSCP Page 4 of 10

Table 1: Water Shortage Contingency Plan Levels
Shortage
Level
Percent Shortage
Range Narrative Description
1 Up to 10% Variations in precipitation and mild droughts that may only last a year or two.
2 Up to 20%
Prolonged water shortages of moderate
severity such as those caused by a multi-year
drought.
3 Up to 30%
Most severe multi-year droughts, major
failures in water production and distribution
facilities.
4 Up to 40% An exceptional crisis that could be caused
only by the most severe multi-year drought,
natural disaster, or catastrophic failure of
major water supply infrastructure. Impacts to
public health and safety would be significant.
5 Up to 50%
6 >50%
NOTES:

4. Shortage Response Actions
The City has established the following shortage response actions within the Municipal Water System service area for the six standard water shortage levels defined above. The City will expand its public information campaign to encourage water conservation to achieve the appropriate decrease in demand for each shortage level. Water meter data will be monitored to determine the effectiveness of the shortage response actions in achieving the desired water demand reduction.

The Demand Reduction Actions to be implemented at each Shortage Level and the associated reduction in the shortage gap anticipated to be achieved due to implementation are summarized in Table 2 .

Table 2: Demand Reduction Actions
Shortage
Level
Demand Reduction
Actions
Reduction in
Shortage Gap
Additional Explanation or
Reference
Penalty, Charge,
or Other
Enforcement?
All
Shortage
Levels
Expand Public
Information Campaign
Depends on
Shortage Level.

See Notes.

Implemented at all stages
as appropriate to meet
demand reduction targets
No
All
Shortage
Levels
Offer Water Use Surveys
Depends on
Shortage Level.

See Notes.

Implemented at all stages No
All
Shortage
Levels
Provide Rebates on
Plumbing Fixtures and
Devices
Depends on
Shortage Level.

See Notes.

Implemented at all stages No

Final Draft 2025 Bakersfield WSCP Page 5 of 10
Shortage
Level
Demand Reduction
Actions
Reduction in
Shortage Gap
Additional Explanation or
Reference
Penalty, Charge,
or Other
Enforcement?
All
Shortage
Levels
Provide Rebates for
Landscape Irrigation
Efficiency
Depends on
Shortage Level.

See Notes.

Implemented at all stages No
All
Shortage
Levels
Landscape - Restrict or
prohibit runoff from
landscape irrigation
Depends on
Shortage Level.

See Notes.

Implemented at all stages
No for Level 1,
Yes for Levels 2
and Higher
All
Shortage
Levels
Landscape - Limit
landscape irrigation to
specific times
Depends on
Shortage Level.

See Notes.

Advise irrigation to be
done after 6 pm and
before 9 am for optimal
efficiency
No for Level 1,
Yes for Levels 2
and Higher
All
Shortage
Levels
CII - Other CII restriction
or prohibition
Depends on
Shortage Level.

See Notes.

Implement water
efficiency measures to
reduce potable water
usage consistent with
reduction targets
No for Level 1,
Yes for Levels 2
and Higher
All
Shortage
Levels
Landscape - Other
landscape restriction or
prohibition
Depends on
Shortage Level.

See Notes.

All irrigation and
landscape projects shall
adhere to the State's
Model Water Efficient
Landscape Ordinance
No for Level 1,
Yes for Levels 2
and Higher
All
Shortage
Levels
Other - Customers must
repair leaks, breaks, and
malfunctions in a timely
manner
Depends on
Shortage Level.

See Notes.

Implemented at all stages
No for Level 1,
Yes for Levels 2
and Higher
All
Shortage
Levels
Other – Require
automatic shut off of
hoses
Depends on
Shortage Level.

See Notes.

Require shut-off nozzles
on hoses for vehicle
washing with potable
water
No for Level 1,
Yes for Levels 2
and Higher
1 Decrease Line Flushing Up to 10%
(See Note 1)
Implemented as
appropriate to meet
demand reduction targets
No
1 Landscape - Limit
landscape irrigation to
specific times
Up to 10%
(See Note 1)
Every other day, three
days per week
No for Level 1,
Yes for Levels 2
and Higher
2 Other - Prohibit use of
potable water for
washing hard surfaces
Up to 20%
(See Note 2) Yes
2 CII - Other CII restriction
or prohibition
Up to 20%
(See Note 2)
Must reduce water usage
consistent with reduction
targets
Yes
3 Increase Water Waste
Patrols
Up to 30%
(See Note 3) No

Final Draft 2025 Bakersfield WSCP Page 6 of 10
Shortage
Level
Demand Reduction
Actions
Reduction in
Shortage Gap
Additional Explanation or
Reference
Penalty, Charge,
or Other
Enforcement?
3 Reduce System Water
Loss
Up to 30%
(See Note 3) No
3 Water Features - Restrict
water use for decorative
water features, such as
fountains
Up to 30%
(See Note 3)
Prohibit water use for
decorative water features
that do not recirculate
water
Yes
3 Other - Prohibit vehicle
washing except at
facilities using recycled or
recirculating water
Up to 30%
(See Note 3) Yes
3 Other - Prohibit use of
potable water for
construction and dust
control
Up to 30%
(See Note 3) No
3 Other Up to 30%
(See Note 3)
Implement mandatory
customer reductions Yes
3 Other Up to 30%
(See Note 3)
Implement drought
ordinance Yes
4 Increase Frequency of
Meter Reading
Up to 40%
(See Note 4)
Monitor water use for
compliance reduction
targets
No
4 Landscape - Prohibit all
landscape irrigation
Up to 40%
(See Note 4)
Prohibit all landscape
irrigation with potable
water
Yes
4 Other water feature or
swimming pool
restriction
Up to 40%
(See Note 4)
Prohibit use of water for
recreational purposes
such as water parks and
filling of pools
No
4 Other Up to 40%
(See Note 4)
Promote/expand use of
recycled water No
5 Pools and Spas - Require
covers for pools and spas
Up to 50%
(See Note 5) No
5 Moratorium or Net Zero
Demand Increase on New
Connections
Up to 50%
(See Note 5)
Require net zero demand
increase on new water
service connections
No
6 Landscape - Prohibit all
landscape irrigation
Greater than
50%
(See Note 6)
Yes

Final Draft 2025 Bakersfield WSCP Page 7 of 10
Shortage
Level
Demand Reduction
Actions
Reduction in
Shortage Gap
Additional Explanation or
Reference
Penalty, Charge,
or Other
Enforcement?
6 Moratorium or Net Zero
Demand Increase on New
Connections
Greater than
50%
(See Note 6)
Moratorium on new
water service connections No
NOTES:

1. Target demand reduction for all measures for Shortage Level 1 is up to 10%.

2. Target demand reduction for all measures for Shortage Level 2 is up to 20%.

3. Target demand reduction for all measures for Shortage Level 3 is up to 30%.

4. Target demand reduction for all measures for Shortage Level 4 is up to 40%.

5. Target demand reduction for all measures for Shortage Level 5 is up to 50%.

6. Target demand reduction for all measures through Shortage Level 6 is greater than 50% up to the anticipated shortage gap.

The City Council shall have the authority to take any other action available to further reduce demands within the Municipal Water System service area to meet available supplies.

The Wholesale Water System will communicate with its retail water system customers regarding the anticipated shortage level and corresponding reductions in available water supplies. The Wholesale Water System will participate in public awareness campaigns and may implement measures to increase available supplies such as short-term water purchases or exchanges depending on the anticipated shortage gap.

Catastrophic Events:

Catastrophic events shall be evaluated as to their impact on the respective City Water System’s ability to deliver water supplies so that the appropriate water shortage level can be identified. The Water Department Director may immediately implement the appropriate shortage response actions due to a catastrophic event.

A seismic risk analysis was completed as a part of the Kern County Multi-Jurisdiction Hazard Mitigation Plan. Earthquake hazard was determined to be a high priority issue county wide. An earthquake can impact water delivery systems through damage to canal systems, water mains, and other water system facilities.

In the event of an earthquake or other catastrophic event, the City will implement its Emergency Response Plan. The City will coordinate with the Kern County Emergency Operations Center in accordance with the Kern County Emergency Operations Plan.

5. Communication Protocols
Table 3 provides the anticipated communication protocols for the various water shortage levels. The degree of communication increases with the water shortage level.

Final Draft 2025 Bakersfield WSCP Page 8 of 10
Table 3 – Communication Protocol by Shortage Level
Shortage Level Description
1 • Public information campaign to encourage water
conservation due to water shortage level.
• Communication with Wholesale Water System
customers regarding anticipated shortage conditions.
2 • Continue with Shortage Level 1 actions as appropriate for Shortage Level 2 conditions.
• Newsletter or bill insert to notify customers of declared water shortage level and implementation of mandatory
water use restrictions in the Municipal Water System
service area.
3 through 6
• Continue with Shortage Level 2 actions as appropriate for the declared Shortage Level condition.
• Press release notifying the public of declared water
shortage level and implementation of mandatory water
use restrictions and enforcement actions in the
Municipal Water System service area.

Emergency
Conditions
• Coordination with Kern County Emergency Operations
Center.
• Communication with Wholesale Water System
customers regarding anticipated shortage conditions.
• Notifications per Emergency Response Plan.
• Public information campaign to notify customers and
public of declared water shortage emergency and
implementation of mandatory water use restrictions in
the Municipal Water System service area.

6. Compliance and Enforcement (Municipal Water System Service Area) As required by Water Code Section 366, excessive water use by metered single-family residential customers and customers in multiunit housing complexes in which each unit is individually metered or submetered is prohibited during water shortage conditions of Level 3 or higher. Customers with excessive water use will be identified through meter data in comparison to the declared water shortage condition and reasonable water use based on factors such as the full-time occupancy of the household, amount of landscaped area, seasonal weather conditions, and the rate of evapotranspiration. The City will establish procedures to monitor compliance with the water use restrictions defined in this WSCP.

Enforcement of the WSCP shall be in accordance with Bakersfield Municipal Code Chapter 14.02 Water Use Regulations which addresses water use restrictions (14.02.010), penalties (14.02.020), administrative citations (14.02.030), administrative fines (14.02.035), administrative citation review process (14.02.040), and administrative hearing officer (14.02.045).

Final Draft 2025 Bakersfield WSCP Page 9 of 10

7. Legal Authorities
The City has the legal authority to declare water shortages through adoption of resolutions or ordinances.

The City shall declare a water shortage emergency in accordance with Chapter 3 (commencing with Section 350) of Division 1 general provision regarding water shortage emergencies in the California Water Code. The City shall coordinate with Kern County for the possible proclamation of a local emergency, as defined in Section 8558 of the Government Code.

Per Bakersfield Municipal Code Section 14.02.020, failure to comply with water use regulations may be punishable as an infraction, or misdemeanor pursuant to Bakersfield Municipal Code Section 1.40.010 , an administrative citation pursuant to Bakersfield Municipal Code Section 14.02.030, or any other available remedies allowed by law.

8. Financial Consequences of WSCP
The City reviews and revises its water rates for its Wholesale Water System and its Municipal Water System on a periodic basis. The projected costs of compliance with declared shortage levels will be considered as contingencies within future rate studies so that adequate reserves will be available to cover the additional expenses and shortfalls in revenue caused by periodic water shortages. The City may also defer planned maintenance or capital improvements until revenues recover. If expenses are found to exceed revenues, the City may implement other measures such as drought rate surcharges or increases in water rates to its customers.

9. Monitoring and Reporting (Municipal Water System Service Area) The City’s Municipal Water System is operated under a service contract with Cal Water. Under normal circumstances, water production is monitored daily. Total water production is reported monthly to the City’s Water Department and incorporated into the water supply report.

During a Level 1 through Level 2 water shortage, monthly production figures will be compared to the target monthly production to verify if the water use reduction goal is being met. If reduction goals are not being met, the Water Department Director will be notified so that corrective action can be taken.

During a Level 3 through Level 6 water shortage, the procedure listed above will be followed, with the addition of a weekly production report to the Water Department Director. During emergency shortages, production figures will be reported to the Water Department Director daily.

10. WSCP Refinement Procedures (Municipal Water System Service Area) The response actions and other considerations in this WSCP shall be reviewed on a periodic basis to determine the effectiveness of the implementation of the various measures to achieve the desired water demand reductions. Proposed revisions to the WSCP will be submitted to the City Council for adoption.

11. Special Water Feature Distinction (Municipal Water System Service Area) Special water features are defined as ponds, lakes, waterfall, fountains, or other water features that may be able to use recycled water or other non-potable supplies. The City may adopt measures that are specific to special water features that do not rely on potable water as a source of supply.

12. Plan Adoption, Submittal, and Availability
This WSCP was adopted by the City as a part of the adoption process for the 2025 UWMP at the Regular Meeting of the City Council on September 16, 2026. A public hearing was held on August 19, 2026. The

Final Draft 2025 Bakersfield WSCP Page 10 of 10
intent of the Public Hearing was to gather input from the public that is served by the City’s Municipal and Wholesale Water Systems as well as other interested entities. Written and verbal comments received during the public hearing process have been addressed as appropriate in the final WSCP document. A copy of the resolution adopting the WSCP is attached as Exhibit A.

The 2025 UWMP update and WSCP will be submitted to the California Department of Water Resources, the California State Library, and Kern County within 30 days of adoption by the City.

Commencing no later than 30 days after adoption, the City will have a copy of the 2025 UWMP update and WSCP available for public review at City Hall and posted on the City’s website.

For updates to the WSCP outside of the UMWP update cycle, the City shall make the revised WSCP available as follows:
• To its customers and Kern County no later than 30 days after adoption, • To Department of Water Resources in accordance with protocols for submission and using electronic reporting tools no later than 30 days after adoption, • For public review during normal business not later than 30 days after filing a copy of the WSCP with the Department of Water Resources.

City of Bakersfield G-1 -
2025 Urban Water Management Plan
Appendix G:

AWWA Water Audit Reporting Worksheets:
 2020 through 2024
Water Audit Report for:

Reporting Year:

All volumes to be entered as: ACRE-FEET PER YEAR
Master Meter and Supply Error Adjustments
WATER SUPPLIED Pcnt: Value:

Volume from own sources: 6 34,106.740 acre-ft/yr 8 0.00% acre-ft/yr Water imported: 3 11,541.960 acre-ft/yr 4 0.00% acre-ft/yr Water exported: 0.000 acre-ft/yr acre-ft/yr
Enter negative % or value for under-registration
WATER SUPPLIED: 45,648.700 acre-ft/yr Enter positive % or value for over-registration .

AUTHORIZED CONSUMPTION
Billed metered: 8 42,514.010 acre-ft/yr
Billed unmetered: 0.000 acre-ft/yr
Unbilled metered: 0.000 acre-ft/yr Pcnt: Value:

Unbilled unmetered: 5 106.285 acre-ft/yr 1.25% acre-ft/yr24061 AUTHORIZED CONSUMPTION: 42,620.295 acre-ft/yr
WATER LOSSES (Water Supplied - Authorized Consumption) 3,028.405 acre-ft/yr Apparent Losses Pcnt: Value:

Unauthorized consumption: 3 106.285 acre-ft/yr 0.25% acre-ft/yr Customer metering inaccuracies: 2 867.633 acre-ft/yr 2.00% acre-ft/yr Systematic data handling errors: 3 106.285 acre-ft/yr 0.25% acre-ft/yr Apparent Losses: 1,080.203 acre-ft/yr
Real Losses (Current Annual Real Losses or CARL)
Real Losses = Water Losses - Apparent Losses: 1,948.202 acre-ft/yr WATER LOSSES: 3,028.405 acre-ft/yr

NON-REVENUE WATER
NON-REVENUE WATER: 3,134.690 acre-ft/yr
= Water Losses + Unbilled Metered + Unbilled Unmetered

SYSTEM DATA
Length of mains: 10 613.0 miles
Number of active AND inactive service connections: 8 48,140 Service connection density: 79 conn./mile main
Yes
Average length of customer service line: ft
Average operating pressure: 7 70.0 psi

COST DATA
Total annual cost of operating water system: 10 $33,878,737 $/Year Customer retail unit cost (applied to Apparent Losses): 10 $1.09 Variable production cost (applied to Real Losses): 9 $148.25 $/acre-ft WATER AUDIT DATA VALIDITY SCORE:

PRIORITY AREAS FOR ATTENTION:
1: Volume from own sources
2: Customer metering inaccuracies
3: Water imported
Based on the information provided, audit accuracy can be improved by addressing the following components:
$/100 cubic feet (ccf)
<----------- Enter grading in column 'E' and 'J' ----------> 106.285
*** YOUR SCORE IS: 64 out of 100 ***
A weighted scale for the components of consumption and water loss is included in the calculation of the Water Audit Data Validity Score 106.285
Average length of customer service line has been set to zero and a data grading score of 10 has been applied Are customer meters typically located at the curbstop or property line? AWWA Free Water Audit Software:

Reporting Worksheet
106.285
2020 1/2020 - 12/2020
CITY OF BAKERSFIELD (CA1510031)
?
?
?
?
?
? Click to access definition
?
?
?
?
?
?
Please enter data in the white cells below. Where available, metered values should be used; if metered values are unavailable please estimate a value. Indicate your confidence in the accuracy of the input data by grading each component (n/a or 1-10) using the drop-down list to the left of the input cell. Hover the mouse over the cell to obtain a description of the grades ?
?
?
?
?
?
(length of service line, beyond the property
boundary, that is the responsibility of the utility)
Use buttons to select
percentage of water
supplied
OR
value
?Click here:
for help using option
buttons below
?
?
?
?
+
+ Click to add a comment
WAS v5.0
+
+
+
+
+
+
American Water Works Association.

Copyright © 2014, All Rights Reserved.
?
?
?
+
+
+
+
+
+
+
+
+
+
+
+
+
Use Customer Retail Unit Cost to value real losses
?
To select the correct data grading for each input, determine the highest grade where the utility meets or exceeds all criteria for that grade and all grades below it.

AWWA Free Water Audit Software v5.0 Reporting Worksheet 1 Water Audit Report for:

Reporting Year:

All volumes to be entered as: ACRE-FEET PER YEAR
Master Meter and Supply Error Adjustments
WATER SUPPLIED Pcnt: Value:

Volume from own sources: 6 42,245.620 acre-ft/yr 8 0.00% acre-ft/yr Water imported: 3 5,331.960 acre-ft/yr 4 0.00% acre-ft/yr Water exported: 0.000 acre-ft/yr acre-ft/yr
Enter negative % or value for under-registration
WATER SUPPLIED: 47,577.580 acre-ft/yr Enter positive % or value for over-registration .

AUTHORIZED CONSUMPTION
Billed metered: 8 43,759.330 acre-ft/yr
Billed unmetered: 0.000 acre-ft/yr
Unbilled metered: 0.000 acre-ft/yr Pcnt: Value:

Unbilled unmetered: 5 118.944 acre-ft/yr 1.25% acre-ft/yr24061 AUTHORIZED CONSUMPTION: 43,878.274 acre-ft/yr
WATER LOSSES (Water Supplied - Authorized Consumption) 3,699.306 acre-ft/yr Apparent Losses Pcnt: Value:

Unauthorized consumption: 3 109.398 acre-ft/yr 0.25% acre-ft/yr Customer metering inaccuracies: 2 893.048 acre-ft/yr 2.00% acre-ft/yr Systematic data handling errors: 3 109.398 acre-ft/yr 0.25% acre-ft/yr Apparent Losses: 1,111.844 acre-ft/yr
Real Losses (Current Annual Real Losses or CARL)
Real Losses = Water Losses - Apparent Losses: 2,587.462 acre-ft/yr WATER LOSSES: 3,699.306 acre-ft/yr

NON-REVENUE WATER
NON-REVENUE WATER: 3,818.250 acre-ft/yr
= Water Losses + Unbilled Metered + Unbilled Unmetered

SYSTEM DATA
Length of mains: 10 618.0 miles
Number of active AND inactive service connections: 8 50,029 Service connection density: 81 conn./mile main
Yes
Average length of customer service line: ft
Average operating pressure: 7 70.0 psi

COST DATA
Total annual cost of operating water system: 10 $37,689,208 $/Year Customer retail unit cost (applied to Apparent Losses): 5 $1.13 Variable production cost (applied to Real Losses): 9 $149.63 $/acre-ft WATER AUDIT DATA VALIDITY SCORE:

PRIORITY AREAS FOR ATTENTION:
1: Volume from own sources
2: Customer metering inaccuracies
3: Customer retail unit cost (applied to Apparent Losses) Average length of customer service line has been set to zero and a data grading score of 10 has been applied Are customer meters typically located at the curbstop or property line? AWWA Free Water Audit Software:

Reporting Worksheet
118.944
2021 1/2021 - 12/2021
CITY OF BAKERSFIELD (CA1510031)
*** YOUR SCORE IS: 61 out of 100 ***
A weighted scale for the components of consumption and water loss is included in the calculation of the Water Audit Data Validity Score 109.398
Based on the information provided, audit accuracy can be improved by addressing the following components:
$/100 cubic feet (ccf)
<----------- Enter grading in column 'E' and 'J' ----------> 109.398
?
?
?
?
?
? Click to access definition
?
?
?
?
?
?
Please enter data in the white cells below. Where available, metered values should be used; if metered values are unavailable please estimate a value. Indicate your confidence in the accuracy of the input data by grading each component (n/a or 1-10) using the drop-down list to the left of the input cell. Hover the mouse over the cell to obtain a description of the grades ?
?
?
?
?
?
(length of service line, beyond the property
boundary, that is the responsibility of the utility)
Use buttons to select
percentage of water
supplied
OR
value
?Click here:
for help using option
buttons below
?
?
?
?
+
+ Click to add a comment
WAS v5.0
+
+
+
+
+
+
American Water Works Association.

Copyright © 2014, All Rights Reserved.
?
?
?
+
+
+
+
+
+
+
+
+
+
+
+
+
Use Customer Retail Unit Cost to value real losses
?
To select the correct data grading for each input, determine the highest grade where the utility meets or exceeds all criteria for that grade and all grades below it.

AWWA Free Water Audit Software v5.0 Reporting Worksheet 1 Water Audit Report for:

Audit Year:

All volumes to be entered as: ACRE-FEET PER YEAR
WATER SUPPLIED choose entry option:

VOS Volume from Own Sources: n g 6 35,192.464 Acre-ft/Yr n g 8 percent acre-ft/yr under-registration VOSEA WI Water Imported: n g 3 7,648.652 Acre-ft/Yr n g 4 percent acre-ft/yr select….. WIEA WE Water Exported: n g n/a 0.000 Acre-ft/Yr n g n/a percent acre-ft/yr select….. WEEA 42,841.116 Acre-ft/Yr
.

AUTHORIZED CONSUMPTION
BMAC Billed Metered: n g 8 40,528.632 Acre-ft/Yr
BUAC Billed Unmetered: n g n/a 0.000 Acre-ft/Yr
UMAC Unbilled Metered: n g n/a 0.000 Acre-ft/Yr choose entry option:

UUAC Unbilled Unmetered: n g 3 101.322 Acre-ft/Yr 0.25% default acre-ft/yr24061 Default option selected for Unbilled Unmetered, with automatic data grading of 3 40,629.954 Acre-ft/Yr
WATER LOSSES 2,211.162 Acre-ft/Yr
Apparent Losses
Default option selected for Systematic Data Handling Errors, with automatic data grading of 3 choose entry option:

SDHE Systematic Data Handling Errors: n g 3 101.322 Acre-ft/Yr 0.25% default acre-ft/yr CMI Customer Metering Inaccuracies: n g 2 827.115 Acre-ft/Yr 2.00% percent acre-ft/yr under-registration UC Unauthorized Consumption: n g 3 101.322 Acre-ft/Yr 0.25% default acre-ft/yr Default option selected for Unauthorized Consumption, with automatic data grading of 3 1,029.758 Acre-ft/Yr
Real Losses
1,181.404 Acre-ft/Yr
2,211.162 Acre-ft/Yr

NON-REVENUE WATER
2,312.484 Acre-ft/Yr

SYSTEM DATA
Lm Length of mains: n g 10 620.0 miles (including fire hydrant lead lengths) Nc Number of service connections: n g 8 50,838 (active and inactive) Service connection density: 82 conn./mile main
Yes
Lp Average length of (private) customer service line: n g 10 ft (average distance between property line and meter) AOP Average Operating Pressure: n g 7 70.0 psi

COST DATA
CRUC Customer Retail Unit Charge: n g 10 $1.19
VPC Variable Production Cost: n g 9 $234.04 $/acre-ft $/yr (optional input) WATER AUDIT DATA VALIDITY TIER:
go to
dashboard
PRIORITY AREAS FOR ATTENTION TO IMPROVE DATA VALIDITY: KEY PERFORMANCE INDICATOR TARGETS:

Based on the information provided, audit reliability can be most improved by addressing the following components: OPTIONAL: If targets exist for the operational performance indicators, they can be input below:
1: Volume from Own Sources (VOS) Unit Total Losses: gal/conn/day 2: Customer Metering Inaccuracies (CMI) Unit Apparent Losses: gal/conn/day 3: Water Imported (WI) Unit Real LossesA: gal/conn/day
Unit Real LossesB: gal/mile/day
If entered above by user, targets will display on KPI gauges (see Dashboard) go to start page
NON-REVENUE WATER:

If entering an
Error Adjustment,
select under- or over-
registration
WATER SUPPLIED:

AUTHORIZED CONSUMPTION:

Apparent Losses:

Average length of customer service line has been set to zero and a data grading of 10 has been applied A weighted scale for the components of supply, consumption and water loss is included in the calculation of the Water Audit Data Validity Score *** The Water Audit Data Validity Score is in Tier III (51-70). See Dashboard tab for additional outputs. *** $/100 cubic feet (ccf)
$41,321,239
Total Annual Operating Cost
Are customer meters typically located at the curbstop/property line? AWWA Free Water Audit Software:

Worksheet

CITY OF BAKERSFIELD
Jan 01 2022 - Dec 31 2022
Water Supplied Error Adjustments
Calendar2022
Real Losses:

WATER LOSSES:

Click 'g' to determine data validity grade
Click 'n' to add notes
FWAS v6.0
American Water Works Association.

Copyright © 2020, All Rights Reserved.

To access definitions, click the input name
To edit water system info:

AWWA Free Water Audit Software v6.0 Worksheet 1
0 AWWA Free Water Audit Software: Dashboard
Water Audit Report for: CITY OF BAKERSFIELD Audit Year: Calendar Jan 01 2022 - Dec 31 2022 Actual KPI result Target (see Worksheet)
1 US$ = Local
Data Validity Score: Data Validity Tier: enter current conversion rate for local currency Tier II (26-50) Tier III (51-70)
Tier IV (71-90)
Tier I (≤25)
Tier V (91-100)
Total Loss Cost Rate Apparent Loss Cost Rate Real Loss Cost Rate $/conn/year $/conn/year $/conn/year
NRW Components Summary
Unit Total Losses Unit Apparent Losses Unit Real LossesA gal/conn/day gal/conn/day gal/conn/day
Average Operating Pressure
psi
Infrastructure Leakage Index (ILI) Unit Real LossesB
dimensionless gal/mile/day
See UARL definition for additional guidance on the ILI
Real Losses Unauthorized Consumption Acre-ft/Yr gal/conn/day Systematic Data Handling Errors Unbilled Unmetered Auth Cons Customer Metering Inaccuracies Unbilled Metered Authorized Cons Apparent Losses
Real Losses
Unbilled Authorized Cons
Non-Revenue Water
0 Blended
101.3
2,312.5
$533,790
$276,496
$23,713
$833,999
1,029.8
1,181.4 VPC
Volume Value
Acre-ft/Yr $/Yr
(UARL) Unavoidable Annual Real Losses 860.9 15.1
VPC
1,7011.4

20.7 70
CRUC
Basis of Valuation

15.94 38.8

10.50 18.1
result is above
90th %ile

5.44 go to referencesgo to worksheet go to grading
2022
Tier III (51-70)65
Data Validity
gauge %iles per validated industry ranges2

0.737
Loss Control Planning for Tier DetailsSee
Key Performance Indicators
0 500
1,000
1,500
2,000
2,500Volume (Acre-ft/Yr)
Total Volume of NRW = 2,312
Acre-ft/Yr
$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
$900,000
Total Cost of NRW =
$833,999/Yr
10th %ile
25th %ile
Median
75th %ile
90th %ile
American Water Works Association.

Copyright © 2020, All Rights Reserved.

FWAS v6.0
Median
90th %ile90th %ile90th %ile
Median Median
Median
Median Median
Median Median
25th
%ile
25th
%ile
25th
%ile
25th
%ile 25th
%ile
25th
%ile
25th
%ile
25th
%ile
75th %ile75th %ile75th %ile
75th %ile 75th %ile 75th %ile
75th %ile75th %ile
10th %ile10th %ile10th %ile
90th %ile10th %ile 90th %ile10th %ile
90th %ile90th %ile90th %ile 10th %ile10th %ile10th %ile Guidance Information for Key Performance Indicators
AWWA Free Water Audit Software v6.0 Dashboard 1
Water Audit Report for:

Audit Year:

All volumes to be entered as: ACRE-FEET PER YEAR
WATER SUPPLIED choose entry option:

VOS Volume from Own Sources: n g 6 34,832.630 Acre-ft/Yr n g 8 percent acre-ft/yr select….. VOSEA WI Water Imported: n g 3 6,223.282 Acre-ft/Yr n g 4 percent acre-ft/yr select….. WIEA WE Water Exported: n g n/a Acre-ft/Yr n g n/a percent acre-ft/yr select….. WEEA 41,055.912 Acre-ft/Yr
.

AUTHORIZED CONSUMPTION
BMAC Billed Metered: n g 8 38,427.670 Acre-ft/Yr
BUAC Billed Unmetered: n g n/a 0.000 Acre-ft/Yr
UMAC Unbilled Metered: n g n/a 0.000 Acre-ft/Yr choose entry option:

UUAC Unbilled Unmetered: n g 3 96.069 Acre-ft/Yr 0.25% default acre-ft/yr24061 Default option selected for Unbilled Unmetered, with automatic data grading of 3 38,523.739 Acre-ft/Yr
WATER LOSSES 2,532.173 Acre-ft/Yr
Apparent Losses
Default option selected for Systematic Data Handling Errors, with automatic data grading of 3 choose entry option:

SDHE Systematic Data Handling Errors: n g 3 96.069 Acre-ft/Yr 0.25% default acre-ft/yr CMI Customer Metering Inaccuracies: n g 3 784.238 Acre-ft/Yr 2.00% percent acre-ft/yr under-registration UC Unauthorized Consumption: n g 3 96.069 Acre-ft/Yr 0.25% default acre-ft/yr Default option selected for Unauthorized Consumption, with automatic data grading of 3 976.377 Acre-ft/Yr
Real Losses
1,555.796 Acre-ft/Yr
2,532.173 Acre-ft/Yr

NON-REVENUE WATER
2,628.242 Acre-ft/Yr

SYSTEM DATA
Lm Length of mains: n g 10 630.7 miles (including fire hydrant lead lengths) Nc Number of service connections: n g 8 51,357 (active and inactive) Service connection density: 81 conn./mile main
Yes
Lp Average length of (private) customer service line: n g 10 ft (average distance between property line and meter) AOP Average Operating Pressure: n g 7 70.0 psi

COST DATA
CRUC Customer Retail Unit Charge: n g 10 $1.32
VPC Variable Production Cost: n g 9 $312.46 $/acre-ft $/yr (optional input) WATER AUDIT DATA VALIDITY TIER:
go to
dashboard
PRIORITY AREAS FOR ATTENTION TO IMPROVE DATA VALIDITY: KEY PERFORMANCE INDICATOR TARGETS:

Based on the information provided, audit reliability can be most improved by addressing the following components: OPTIONAL: If targets exist for the operational performance indicators, they can be input below:
1: Volume from Own Sources (VOS) Unit Total Losses: gal/conn/day 2: Customer Metering Inaccuracies (CMI) Unit Apparent Losses: gal/conn/day 3: Water Imported (WI) Unit Real LossesA: gal/conn/day
Unit Real LossesB: gal/mile/day
If entered above by user, targets will display on KPI gauges (see Dashboard) Are customer meters typically located at the curbstop/property line? AWWA Free Water Audit Software:

Worksheet
City of Bakersfield
Jan 01 2023 - Dec 31 2023
Water Supplied Error Adjustments
Calendar2023
Real Losses:

WATER LOSSES:

Average length of customer service line has been set to zero and a data grading of 10 has been applied A weighted scale for the components of supply, consumption and water loss is included in the calculation of the Water Audit Data Validity Score *** The Water Audit Data Validity Score is in Tier III (51-70). See Dashboard tab for additional outputs. *** $/100 cubic feet (ccf)
$29,838,278
Total Annual Operating Cost
go to start page
NON-REVENUE WATER:

If entering an
Error Adjustment,
select under- or over-
registration
WATER SUPPLIED:

AUTHORIZED CONSUMPTION:

Apparent Losses:

Click 'g' to determine data validity grade
Click 'n' to add notes
FWAS v6.0
American Water Works Association.

To access definitions, click the input name
To edit water system info:

AWWA Free Water Audit Software v6.0 Worksheet 1
0 AWWA Free Water Audit Software: Dashboard
Water Audit Report for: City of Bakersfield Audit Year: Calendar Jan 01 2023 - Dec 31 2023 Actual KPI result Target (see Worksheet)
1 US$ = Local
Data Validity Score: Data Validity Tier: enter current conversion rate for local currency Tier II (26-50) Tier III (51-70)
Tier IV (71-90)
Tier I (≤25)
Tier V (91-100)
Total Loss Cost Rate Apparent Loss Cost Rate Real Loss Cost Rate $/conn/year $/conn/year $/conn/year
NRW Components Summary
Unit Total Losses Unit Apparent Losses Unit Real LossesA gal/conn/day gal/conn/day gal/conn/day
Average Operating Pressure
psi
Infrastructure Leakage Index (ILI) Unit Real LossesB
dimensionless gal/mile/day
See UARL definition for additional guidance on the ILI
Real Losses Unauthorized Consumption Acre-ft/Yr gal/conn/day Systematic Data Handling Errors Unbilled Unmetered Auth Cons Customer Metering Inaccuracies Unbilled Metered Authorized Cons Apparent Losses
Real Losses
Unbilled Authorized Cons
Non-Revenue Water
0 2023
Tier III (51-70)66
Data Validity
gauge %iles per validated industry ranges2

0.737
Loss Control Planning for Tier DetailsSee
Key Performance Indicators
result is above
90th %ile

9.47 go to referencesgo to worksheet go to grading

20.40 44.0

10.93 17.0
(UARL) Unavoidable Annual Real Losses 871.6 15.2
VPC
2,2021.8

27.0 70
CRUC
Basis of Valuation
Blended

96.1 2,628.2
$561,409
$486,124
$30,018
$1,077,550
976.4
1,555.8 VPC
Volume Value
Acre-ft/Yr $/Yr
0 500
1,000
1,500
2,000
2,500
3,000Volume (Acre-ft/Yr)
Total Volume of NRW = 2,628
Acre-ft/Yr
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
Total Cost of NRW =
$1,077,550/Yr
10th %ile
25th %ile
Median
75th %ile
90th %ile
American Water Works Association.

Copyright © 2020, All Rights Reserved.

FWAS v6.0
Median
90th %ile90th %ile90th %ile
Median Median
Median
Median Median
Median Median
25th
%ile
25th
%ile
25th
%ile
25th
%ile 25th
%ile
25th
%ile
25th
%ile
25th
%ile
75th %ile75th %ile75th %ile
75th %ile 75th %ile 75th %ile
75th %ile75th %ile
10th %ile10th %ile10th %ile
90th %ile10th %ile 90th %ile10th %ile
90th %ile90th %ile90th %ile 10th %ile10th %ile10th %ile Guidance Information for Key Performance Indicators
AWWA Free Water Audit Software v6.0 Dashboard 1
Water Audit Report for:

Audit Year:

All volumes to be entered as: ACRE-FEET PER YEAR
WATER SUPPLIED choose entry option:

VOS Volume from Own Sources: n g 5 38,079.930 Acre-ft/Yr n g 8 percent acre-ft/yr select….. VOSEA WI Water Imported: n g 3 6,200.220 Acre-ft/Yr n g 4 percent acre-ft/yr select….. WIEA WE Water Exported: n g n/a 0.000 Acre-ft/Yr n g n/a percent acre-ft/yr select….. WEEA 44,280.150 Acre-ft/Yr
.

AUTHORIZED CONSUMPTION
BMAC Billed Metered: n g 8 40,684.560 Acre-ft/Yr
BUAC Billed Unmetered: n g n/a 0.000 Acre-ft/Yr
UMAC Unbilled Metered: n g n/a 0.000 Acre-ft/Yr choose entry option:

UUAC Unbilled Unmetered: n g 3 101.711 Acre-ft/Yr 0.25% default acre-ft/yr24061 Default option selected for Unbilled Unmetered, with automatic data grading of 3 40,786.271 Acre-ft/Yr
WATER LOSSES 3,493.879 Acre-ft/Yr
Apparent Losses
Default option selected for Systematic Data Handling Errors, with automatic data grading of 3 choose entry option:

SDHE Systematic Data Handling Errors: n g 3 101.711 Acre-ft/Yr 0.25% default acre-ft/yr CMI Customer Metering Inaccuracies: n g 3 830.297 Acre-ft/Yr 2.00% percent acre-ft/yr under-registration UC Unauthorized Consumption: n g 3 101.711 Acre-ft/Yr 0.25% default acre-ft/yr Default option selected for Unauthorized Consumption, with automatic data grading of 3 1,033.720 Acre-ft/Yr
Real Losses
2,460.159 Acre-ft/Yr
3,493.879 Acre-ft/Yr

NON-REVENUE WATER
3,595.590 Acre-ft/Yr

SYSTEM DATA
Lm Length of mains: n g 10 640.2 miles (including fire hydrant lead lengths) Nc Number of service connections: n g 8 51,664 (active and inactive) Service connection density: 81 conn./mile main
Yes
Lp Average length of (private) customer service line: n g 10 ft (average distance between property line and meter) AOP Average Operating Pressure: n g 7 70.0 psi

COST DATA
CRUC Customer Retail Unit Charge: n g 10 $1.40
VPC Variable Production Cost: n g 9 $305.25 $/acre-ft $/yr (optional input) WATER AUDIT DATA VALIDITY TIER:
go to
dashboard
PRIORITY AREAS FOR ATTENTION TO IMPROVE DATA VALIDITY: KEY PERFORMANCE INDICATOR TARGETS:

Based on the information provided, audit reliability can be most improved by addressing the following components: OPTIONAL: If targets exist for the operational performance indicators, they can be input below:
1: Volume from Own Sources (VOS) Unit Total Losses: gal/conn/day 2: Customer Metering Inaccuracies (CMI) Unit Apparent Losses: gal/conn/day 3: Billed Metered (BMAC) Unit Real LossesA: gal/conn/day Unit Real LossesB: gal/mile/day
If entered above by user, targets will display on KPI gauges (see Dashboard) Are customer meters typically located at the curbstop/property line? AWWA Free Water Audit Software:

Worksheet
City of Bakersfield
Jan 01 2024 - Dec 31 2024
Water Supplied Error Adjustments
Calendar2024
Real Losses:

WATER LOSSES:

Average length of customer service line has been set to zero and a data grading of 10 has been applied A weighted scale for the components of supply, consumption and water loss is included in the calculation of the Water Audit Data Validity Score *** The Water Audit Data Validity Score is in Tier III (51-70). See Dashboard tab for additional outputs. *** $/100 cubic feet (ccf)
$43,490,673
Total Annual Operating Cost
go to start page
NON-REVENUE WATER:

If entering an
Error Adjustment,
select under- or over-
registration
WATER SUPPLIED:

AUTHORIZED CONSUMPTION:

Apparent Losses:

Click 'g' to determine data validity grade
Click 'n' to add notes
FWAS v6.0
American Water Works Association.

To access definitions, click the input name
To edit water system info:

AWWA Free Water Audit Software v6.0 Worksheet 1
0 AWWA Free Water Audit Software: Dashboard
Water Audit Report for: City of Bakersfield Audit Year: Calendar Jan 01 2024 - Dec 31 2024 Actual KPI result Target (see Worksheet)
1 US$ = Local
Data Validity Score: Data Validity Tier: enter current conversion rate for local currency Tier II (26-50) Tier III (51-70)
Tier IV (71-90)
Tier I (≤25)
Tier V (91-100)
Total Loss Cost Rate Apparent Loss Cost Rate Real Loss Cost Rate $/conn/year $/conn/year $/conn/year
NRW Components Summary
Unit Total Losses Unit Apparent Losses Unit Real LossesA gal/conn/day gal/conn/day gal/conn/day
Average Operating Pressure
psi
Infrastructure Leakage Index (ILI) Unit Real LossesB
dimensionless gal/mile/day
See UARL definition for additional guidance on the ILI
Real Losses Unauthorized Consumption Acre-ft/Yr gal/conn/day Systematic Data Handling Errors Unbilled Unmetered Auth Cons Customer Metering Inaccuracies Unbilled Metered Authorized Cons Apparent Losses
Real Losses
Unbilled Authorized Cons
Non-Revenue Water
0 2024
Tier III (51-70)63
Data Validity
gauge %iles per validated industry ranges2

0.737
Loss Control Planning for Tier DetailsSee
Key Performance Indicators
result is above
90th %ile

14.54 go to referencesgo to worksheet go to grading

26.74 60.4

12.20 17.9
(UARL) Unavoidable Annual Real Losses 879.2 15.2
VPC
3,4312.8

42.5 70
CRUC
Basis of Valuation
Blended
101.7
3,595.6
$630,404
$750,963
$31,047
$1,412,415
1,033.7
2,460.2 VPC
Volume Value
Acre-ft/Yr $/Yr
0 500
1,000
1,500
2,000
2,500
3,000
3,500
4,000Volume (Acre-ft/Yr)
Total Volume of NRW = 3,596
Acre-ft/Yr
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
$1,400,000
$1,600,000
Total Cost of NRW =
$1,412,415/Yr
10th %ile
25th %ile
Median
75th %ile
90th %ile
American Water Works Association.

Copyright © 2020, All Rights Reserved.

FWAS v6.0
Median
90th %ile90th %ile90th %ile
Median Median
Median
Median Median
Median Median
25th
%ile
25th
%ile
25th
%ile
25th
%ile 25th
%ile
25th
%ile
25th
%ile
25th
%ile
75th %ile75th %ile75th %ile
75th %ile 75th %ile 75th %ile
75th %ile75th %ile
10th %ile10th %ile10th %ile
90th %ile10th %ile 90th %ile10th %ile
90th %ile90th %ile90th %ile 10th %ile10th %ile10th %ile Guidance Information for Key Performance Indicators
AWWA Free Water Audit Software v6.0 Dashboard 1
City of Bakersfield H-1 -
2025 Urban Water Management Plan
Appendix H:

Multi-Jurisdiction Hazard Mitigation Plan:
 City of Bakersfield
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

i

CITY OF BAKERSFIELD

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

ii

INTENTIONAL BLANK PAGE

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

iii
Kern County
Multi-Jurisdiction Hazard Mitigation Plan
CITY OF BAKERSFIELD (BK.)
Municipal Participating Jurisdiction Annex
Adoption Record ...................................................................................................................................................................................... iv Section 1. City of Bakersfield ............................................................................................................... 1-1

1.1 Purpose ................................................................................................................................................................................................. 1-1

1.2 Planning Methodology .................................................................................................................................................................. 1-1

1.3 What’s New ........................................................................................................................................................................................ 1-2

1.3.1 Mitigation Successes ........................................................................................................................................................... 1-3

1.4 Risk Assessment ............................................................................................................................................................................ 1-5

1.4.1 Hazard Screening Criteria ................................................................................................................................................. 1-5

1.4.2 Hazard Risk Ranking ........................................................................................................................................................... 1-7

1.4.3 Vulnerability Assessment ................................................................................................................................................. 1-8

1.4.4 Identify Hazard Problem Statements ........................................................................................................................ 1-20

1.5 Mitigation Strategy ...................................................................................................................................................................... 1-25

1.5.1 Capabilities Assessment .................................................................................................................................................. 1-25

1.5.2 Mitigation Actions .............................................................................................................................................................. 1-31

List of Figures
Figure 1-1 City of Bakersfield Location ......................................................................................................................................... 1-2 Figure 1-2. New SSCSD Office........................................................................................................................................................... 1-4 Figure 1-3: City of Bakersfield Risk Assessment ...................................................................................................................... 1-9 Figure 1-4: City of Bakersfield – FEMA Flood Zone Vulnerability & Exposure Snapshot ...................................... 1-10 Figure 1-4: City of Bakersfield – EQ S. San Andreas Mojave N. Vulnerability & Exposure Snapshot ................ 1-11 Figure 1-4: City of Bakersfield – Historic Fire Occurrence ................................................................................................ 1-12 Figure 1-4: City of Bakersfield – Wildfire Return Intervals ................................................................................................ 1-13 Figure 1-4: City of Bakersfield – Wildfire Vulnerability & Exposure Snapshot .......................................................... 1-14 Figure 1-4: City of Bakersfield – Subsidence Vulnerability & Exposure Snapshot ................................................... 1-15 Figure 1-6: City of Bakersfield – Drought Severity Timeline – Middle Kern-Upper Tehachapi-Grapevine ... 1-16 Figure 1-7. Guidance for Problem Statements ....................................................................................................................... 1-20 Figure 1-8. Mitigation Action Key .............................................................................................Error! Bookmark not defined.

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

iv
List of Tables
Table 1-1: Planning Committee Members .................................................................................................................................... 1-1 Table 1-2 Cancelled Mitigation Actions ........................................................................................................................................1-3 Table 1-3 Completed Mitigation Actions ......................................................................................................................................1-3 Table 1-4. Hazard Prioritization ...................................................................................................................................................... 1-6 Table 1-5 Document Review Crosswalk....................................................................................................................................... 1-7 Table 1-6: NFIP Status Table ........................................................................................................................................................... 1-19 Table 1-7 Problem Statements ....................................................................................................................................................... 1-21 Table 1-8. Planning and Regulatory Capabilities Summary .............................................................................................. 1-26 Table 1-9. Administrative and technical capabilities summary ..................................................................................... 1-28 Table 1-10. Financial capabilities summary ............................................................................................................................ 1-29 Table 1-11. Education and outreach capabilities summary ............................................................................................... 1-30 Table 1-12. City of Bakersfield Mitigation Actions ................................................................................................................ 1-33

Adoption Record
To comply with DMA 2000, the County Board of Supervisors and participating jurisdictions have officially adopted this Kern County Multi-Jurisdictional Hazard Mitigation Plan Volume 1 and Volume 2. The adoption of the MJHMP in its entirety recognizes the jurisdictions’ commitment to reducing the impacts of natural hazards within the County and Cities. See below record of adoption.

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-1
Section 1. City of Bakersfield

1.1 Purpose
This Annex details the hazard mitigation planning elements specific to the City of Bakersfield. This Annex is not intended to be a standalone document but appends to and supplements the information contained in the umbrella plan document. As such, all sections of the umbrella plan, including the planning process and other procedural requirements apply to and were met by the City of Bakersfield. This Annex provides additional information specific to the City of Bakersfield, with a focus on providing additional details on the planning process, risk assessment, and mitigation strategy for this community.

Hazard Mitigation Plan Point of Contact
Primary Point of Contact Alternate Point of Contact
Chris Huot, Assistant City Manager
City of Bakersfield
1600 Truxtun Ave,
Bakersfield, CA 93306
Telephone: (661) 326-3751
e-mail Address: [email protected]
Brianna Carrier, Administrative Analyst III
City of Bakersfield
1600 Truxtun Ave,
Bakersfield, CA 93306
Telephone: (661) 326-3745
e-mail Address: [email protected]

1.2 Planning Methodology
The City of Bakersfield followed the planning process detailed in Volume 1, Section 3 , including participating in the County Hazard Mitigation Planning Committee (HMPC) and Steering Committee and formulating their own internal planning team to support the broader planning process. Internal planning participants, their positions, and how they participated in the planning process are shown in Table 1-1.

Table 1-1: Planning Committee Members
Planning Committee Members Department
Chris Huot Assistant City Manager
Brianna Carrier Administrative Analyst III
John Frando Deputy Fire Chief
Kevin Albertson Fire Marshal
Robert Voyles Operations Manager
Stuart Patteson, P.E. Assistant Public Works Director
William Ballard Deputy Fire Chief
FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-2

Figure 1-1 City of Bakersfield Location

1.3 What’s New
The City of Bakersfield has been making improvements toward reducing natural hazard risks to life and property since the existing MJHMP was adopted.

The City reevaluated previous mitigation actions. Some mitigation actions have been completed and are highlighted in Table 1-3 The City determined to cancel some due to reprioritization, lack of funding, or other listed reasons. Table 1-2 lists those cancelled mitigation actions along with an explanation for why.

Other mitigation actions are pending or ongoing and are included in Table 1-12.

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-3
Table 1-2 Cancelled Mitigation Actions
Mitigation
No.

Hazard
Type
Status Year Primary
Agency
Title/Description Responsible
Party
Reason Cancelled
ma-FL-
BK-203
Flood Cancelled 2005 City of
Bakersfield
Flood and storm
damage
mitigation by
completing
improvements
recommended in
the Downtown
Bakersfield
Drainage Study.

City of
Bakersfield,
Public
Works Dept.

Some portions were completed (22nd
St. Storm Drain) and others are rolled
into 2014 ma-FL-BK-73

1.3.1 Mitigation Successes
Table 1-3 displays multiple important mitigation actions that have been completed by the City of Bakersfield. Some of the City’s success stories are described in more detail herein.

Table 1-3 Completed Mitigation Actions
Mitigation No. Hazard
Type
Status Year Primary Agency Title/Description Responsible Party
ma-AH-BK-20 All Hazard Completed 2014 City of Bakersfield Repair or replace irrigation canal culverts under city streets
City of
Bakersfield,
Public Works
Dept.
ma-FL-BK-21 Flood Completed 2014 City of Bakersfield Jewetta north of Stockdale Hwy drainage project
City of
Bakersfield
ma-FL-BK-22 Flood Completed 2014 City of Bakersfield Panaman Ln @ Golden Gate sump City of Bakersfield
ma-FL-BK-112 Flood Completed 2005 City of Bakersfield Tallisman Sump City of Bakersfield
ma-FL-BK-113 Flood Completed 2005 City of Bakersfield Pump Stations at Beach Park and Pistol Range
City of
Bakersfield
ma-FL-BK-116 Flood Completed 2005 City of Bakersfield Greenbelt Sump (Monitor Area) City of Bakersfield
Public Works
ma-FL-BK-96 Flood Completed 2014 City of Bakersfield Campus Park South Drainage Basin
City of
Bakersfield
Public Works

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-4
Success Story , New Backup
Generators for Stormwater Pumps :

The City installed two new backup
generators for critical stormwater
facilities in 2018. The project was
funded through FEMA’s Hazard
Mitigation Grant Program.

Generators were installed at the
water pump stations at Beach Park
and the police pistol range. These
generators are a critical element for
flood protection needed to ensure the
reliability of two stormwater pump
stations that protect portio ns of the
Westchester and downtown areas.

Success Story , Talisman Sump: The
City is nearing completion of replacement of the Talisman Storm Pump Station (ma-FL-BK-112). COVID-19 substantially delayed this project due to availability of submersible and vertical turbine pumps used in high volume storm pump stations. The project is projected to be completed in winter of 2021.

Success Story, Seismic Retrofits: The City has undertaken a comprehensive seismic retrofit program for City-owned bridges. The City is currently completing construction of the final bridge that qualifies under the retrofit program at Manor Street.

Figure 1-2. Completion Ceremony for New Backup Generator

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-5

1.4 Risk Assessment
The intent of this section is to profile the City of Bakersfield’s hazards and assess the City’s vulnerabilities, distinct from that of the County wide planning area. The hazard profiles in Vol ume 1 discuss overall impacts to the planning area and describes the hazard problem description, hazard extent, magnitude/severity, previous occurrences of hazard events and the likelihood of future occurrences. For more information on Risk Assessment Methodologies, see Vol. 1 and Appendix A.

1.4.1 Hazard Screening Criteria
Planning Team members from each participating jurisdiction collectively discussed which hazards should be profiled in the Plan and which should not. The results of that discussion can be found in Table 1-4.

Detailed hazard profiles of the most significant County wide hazards are described in Section 4 of Volume 1. The Planning Team reviewed previously-prepared hazard mitigation plans and other relevant documents to determine the realm of natural hazards that have the potential to affect the City of Bakersfield. Table 1-5 provides a crosswalk of hazards identified in Vol. 1 of this plan, the City of Bakersfield General Plan, and 2018 California State Hazard Mitigation Plan. The crosswalk was used to develop a preliminary hazards list, providing a framework for the Planning Team members to evaluate wh ich hazards were truly relevant to the City of Bakersfield and which ones were not. Section 1.4.2 below describes the hazard risk ranking process that was performed by the planning team which prioritized hazards that are specifically relevant to the City of Bakersfield.

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-6
Table 1-4. Hazard Prioritization
Hazard Type Explanation
Climate Change High priority county wide, profiled as part of Flood, Wildfire, and Severe Weather hazard.

Dam failure High priority county wide, profiled hazard.

Drought High priority county wide, profiled hazard
Dust Storms High priority county wide; profiled as part of Severe Weather Earthquake/ Geologic Hazards High priority county wide, profiled hazard Extreme Heat Profiled as part of Severe Weather hazard
Extreme Cold Extreme cold is rare in Kern County and not profiled in this plan Flood High priority county wide, profiled hazard
Hail Hail events are rare in Kern County and not profiled in this plan Fog While fog events do occur within Kern County, they are rare and are not considered a priority
Hazardous Material While hazardous materials can release and impact the County, there are better avenues to address this hazard outside this Plan.

High Winds/ Straight Line Winds High priority county wide, profiled as part of Severe Weather Insect Hazards While insects including Africanized honey bee and pine bark beetle exist in Kern County, this was not considered a priority and pests are not profiled in this plan
Levee Failure High priority county wide, profiled as part of Dam Failure Lightning Lightning was not identified as a priority for this plan.

Pandemic Disease While pandemic disease can impact the County, there are better avenues to address this hazard outside this plan.

Radon This hazard was not identified as a priority
Severe Thunderstorm Severe thunderstorms are rare in Kern County and not profiled in this plan.

Slope Failure High priority county wide, profiled hazard Soil Hazards High priority county wide, profiled hazard Terrorism/Human Caused Threats While terrorism is certainly a threat to the County and participating jurisdictions, it is best addressed in other plans as this HMP does not address human caused threats.

Tornado Impacts to the County from tornados are extremely unlikely, if any.

Volcanic Activity Due to distance from volcanoes and the limited chance of an eruption, this hazard was not identified as a priority.

Wildfire High priority county wide, profiled hazard
Winter Storm / Freeze Events Profiled as part of Severe Weather hazard

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-7
Table 1-5 Document Review Crosswalk
Hazards
2014 Kern County
MJHMP
2002
Bakersfield
General Plan

2009 Kern County
General Plan
2018 California State
HMP
Agricultural Pests

■
Climate Change ■

■
Dam Failure ■ ■ ■ ■
Drought ■

■
Earthquake ■ ■ ■ ■
Flood ■ ■ ■ ■
Insect Hazards ■
Landslide ■ ■ ■ ■
Levee Failure ■ ■
Manmade Hazards ■ ■
Pandemic Disease ■ ■
Sea Level Rise ■
Severe Weather ■

■
Soil Hazards ■ ■ ■
Terrorism & Tech Hazards ■
Tsunami ■
Volcano ■ ■
Wildfire ■ ■ ■

1.4.2 Hazard Risk Ranking
The City of Bakersfield’s Planning Team used the same hazard prioritization process as the Kern County Planning Committee. This process is described in detail in Section 4.3.1 of Vol . 1. Figure 1-3 displays the results of the hazard risk ranking exercise that was performed by the Planning Team. The Planning Team chose to assess the City of Bakersfield’s vulnerability to the following hazards:
▪ flood ▪ wildfire ▪ drought
▪ earthquake ▪ soil stability

All of these hazards have been profiled in Vol. 1 of this document. The purpose of this annex to address the City of Bakersfield’s vulnerability to these specifically-identified hazards.

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-8

1.4.3 Vulnerability Assessment
Assessing vulnerabilities exposes the unique characteristics of individual hazards and begins the process of narrowing down which areas within the City of Bakersfield are vulnerable to specific hazard events. The vulnerability assessment considered unique local knowledge of hazards and impacts and a GIS overlaying method for examining such vulnerabilities more in depth. Using these methods, participating jurisdictions estimated vulnerable populations, infrastructure, and potential losses from hazards.

1.4.3.1 Risk Assessment
Each participating jurisdiction developed a risk matrix that assessed the probability and impact of various hazards within the jurisdiction. Figure 1-3 is the jurisdiction’s risk assessment, which was completed in part using the web based and interactive Risk Assessment Mapping Platform (RAMP), accessed via the project website at www.mitigatehazards.com. RAMP allows interactive discovery of robust risk, vulnerability, and exposure data developed especially for Kern County. RAMP is a mapping platform built specifically for mitigation planning. It displays County/jurisdiction facilities and buildings overlaid with natural hazards layers to bring interactivity and individual discovery to the GIS analysis performed for the MJHMP. See Vol. 1 for a detailed description of RAMP. The Planning Team used RAMP in meetings and as needed to understand vulnerabilities to the City of Bakersfield. Users interactively filter facilities and buildings by natural hazard zones and/or construction characteristics.

1.4.3.2 Snapshot Exposure Maps
The included snapshot maps, displayed below in Figure 1-4 through Figure 1-10, illustrates the City of Bakersfield’s vulnerability to specific hazards. Figures include:
▪ Figure 1-4: City of Bakersfield – FEMA Flood Zone Vulnerability & Exposure Snapshot ▪ Figure 1-5: City of Bakersfield – EQ S. San Andreas Mojave N. Vulnerability & Exposure Snapshot ▪ Figure 1-6: City of Bakersfield – Historic Fire Occurrence ▪ Figure 1-7: City of Bakersfield – Wildfire Return Intervals ▪ Figure 1-8: City of Bakersfield – Wildfire Vulnerability & Exposure Snapshot ▪ Figure 1-9: City of Bakersfield – Subsidence Vulnerability & Exposure Snapshot1 ▪ Figure 1-10: City of Bakersfield – Drought Severity Timeline – Middle Kern-Upper Tehachapi- Grapevine
Based on the above risk assessment, the snapshot maps focus on those hazards prioritized by the jurisdiction. These maps helped the Planning Team understand the exposure of population, parcels, and critical infrastructure to specific hazards. Each map contains an exposure summary that displays the percent of the population, the improvement and content value of parcels, and the amount of critical infrastructure that is exposed to each respective hazard.

1 Damage estimations are available on RAMP.

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-9

Figure 1-3: City of Bakersfield Risk Assessment

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-10

Figure 1-4: City of Bakersfield – FEMA Flood Zone Vulnerability & Exposure Snapshot FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-11

Figure 1-5: City of Bakersfield – EQ S. San Andreas Mojave N. Vulnerability & Exposure Snapshot

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-12

Figure 1-6: City of Bakersfield – Historic Fire Occurrence

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-13

Figure 1-7: City of Bakersfield – Wildfire Return Intervals

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-14

Figure 1-8: City of Bakersfield – Wildfire Vulnerability & Exposure Snapshot FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-15

Figure 1-9: City of Bakersfield – Subsidence Vulnerability & Exposure Snapshot

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-16

Figure 1-10: City of Bakersfield – Drought Severity Timeline – Middle Kern-Upper Tehachapi-Grapevine

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-17

1.4.3.3 Past and Future Development
The City of Bakersfield is a charter city that crafts its own laws related to municipal affairs, including future development. If the City has not regulated, or the issue is not municipal in nature, the City is subject to State law. Future development may be subject to compliance with State of California planning, zoning, subdivision, and architecture laws.

The City of Bakersfield’s General Plan (GP) establishes long-range development policies. The GP is designed to help the City address issues related to land use, circulation (traffic), housing, open space, conservation, noise, and safety. The Land Use portion of the plan helps guide the City in determining the location of future development(s), including possible future annexation. In addition to the GP, the City has other plans that guide development in specific areas, including specific plans, policy plans, and ma ster plans. These plans help to shape future development and dictate the City’s Sphere of Influence (SOI). One of the central functions in these planning documents is to decrease risk of impact from natural hazards.

Development since Previous HMP
The City considered its growth since the last HMP and determined it had completed a central mitigation action and substantially decreased its vulnerability to hazards. The City installed new back-up generators for stormwater pumps, they have also implemented a seismic retrofit program of local bridges. This HMP Annex has been revised to reflect this substantial change in past development and continues to focus on avenues to better mitigate impacts from problematic past development. This is especially important as the District does not regulate future development and instead provides services and infrastructure to such development.

Future Development
City of Bakersfield is required to update building codes to meet the minimum standards to those required in the California Building Code last updated in 2019. California Building Codes provide some of the safest construction standards in the world and are meant to reduce risk t o occupants from high wind, seismic activity, landslides, flood, wildfire, and other natural hazards. In addition to California minimum develop standards, all jurisdictions belong to the NFIP, as such, all development must meet minimum flood protection standards set forth by FEMA. See Section 4.3.5 of Volume 1 for more information about past and future development in Kern County.

As the General Plan is updated and incorporates information from this HMP, City of Bakersfield staff are continually improving hazard information through these hazard mitigation plan updates. With this 2020 update, improved online mapping about natural hazards available on RAMP will inform those responsible for future development to make better decisions where and how future development occurs.

City of Bakersfield reviewed its general plans under the capability assessments undertaken for this hazard mitigation plan. See Section 1.5.1. Deficiencies revealed by these reviews are identified as mitigation actions to decrease risks to move beyond past trends.

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-18
The City’s municipal codes includes regulations to mitigate the impact of hazards on new and existing development, including:
▪ Drainage and stormwater retention requirements,
▪ Steep slope restrictions for new development,
▪ Waterbody buffer requirements,
▪ Floodplain management regulations,
▪ Zoning that prevents development in hazardous areas of the community such as floodplains, landslide areas, the wildland-urban interface (WUI), or other known hazard areas, and ▪ Building codes that include the most up-to-date California Fire Code, seismic standards, and many other provisions crafted to protect new construction from hazard events.

The City of Bakersfield’s current General Plan was adopted in 2002, with amendments occurring at various points since that time. Since the adoption of the General Plan and its amendments, there have been significant changes in demographics, existing conditions, land use, and economic and social trends in Bakersfield and the larger region. The beginning of a comprehensive update to the General Plan acknowledges the significant changes of the past and plans for the significant changes that will occur in the future. In addition to changes to the existing set ting, changes in data gathering and modeling capabilities have dramatically improved in the past 20 years, allowing more accurate analysis of future impacts and to better predict potential hazard impacts on the city. The comprehensive update of the General Plan will strengthen the HCP, acting as a policy tool in identifying hazards and assisting the HCP in providing guidance in hazard mitigation into the future.

Even in the event that limited development did occur within a hazard area, the municipal code sh ould ensure impacts from a hazard event are mitigated and losses are minimal. If development does occur in hazard areas, evacuation and emergency planning should take into consideration the anticipated local impacts of the hazard event, including potential interrupted services or the elimination of access.

The anticipated growth in the City will not cause significant change in vulnerability to the City for identified priority hazards.

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-19
National Flood Insurance Program (NFIP)
The NFIP makes federally backed flood insurance available to homeowners, renters, and business owners in participating communities. FEMA has prepared a detailed Flood Insurance Study (FIS) for Kern County and municipalities. The study presents water surface elevations for floods of va rious magnitudes, including the 1-percent annual chance flood and the 0.2-percent annual chance flood (the 500-YR flood).

Base flood elevations and the boundaries of the 100- and 500-YR floodplains are shown on Flood Insurance Rate Maps (FIRMs), which are the principle tool for identifying the extent and location of the flood hazard.

FIRMs are the most detailed and consistent data source available, and for many communities they represent the minimum area of oversight under their floodplain management progra m. See Section 4 of Volume 1 for general information on the NFIP.

The City of Bakersfield has participated in the NFIP since 1985. The City of Bakersfield is currently in good standing with the provisions of the NFIP. Compliance is monitored by FEMA regional staff and by the California Department of Wa ter Resources under a contract with FEMA. Maintaining compliance under the NFIP is an important component of flood risk reduction. See Table 1-6 for more information on the City’s policies and historic flood insurance claims.

Table 1-6: NFIP Status Table
NFIP Status Participating since 5/01/1985
Policies in Force 605
Policies in SFHA 17
Policies in non-SFHA 588
Total Claims Paid 25
Paid Losses $ 63,276
Repetitive Loss Properties 4
Severe Repetitive Loss Properties 0
Repetitive Loss Payment by NFIP on Building N/D
Repetitive Loss Payment by NFIP on Contents N/D
Note: N/D signifies no data.

See Volume 1, Section 4.5 for more information on the NFIP.

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-20

1.4.4 Identify Hazard Problem Statements
As part of the mitigation action identification process, the Planning Committee for each jurisdiction identified areas of concern (aka problem statements) for their respective facilities based on the risk assessment and vulnerability analysis, utilizing the RAMP mapping and static snapshot maps . Problem statements focused on the impact, victim, or threat that the hazard could create in the jurisdiction, as described in Figure 1-11. Identifying common issues and weaknesses through these problem statements assisted the Planning Committee in understanding the realm of resources needed for mitigation.

Jurisdiction problem statements are listed in Table 1-7.

The goal is to have at least one mitigation action for every problem statement. Projects or actions have been developed to mitigate each problem identified. See Table 1-12 for a full list of mitigation actions and corresponding problem statements that they address. Each problem statement is coded with a problem number for cross-referencing between Table 1-7 and Table 1-12.

Figure 1-11. Guidance for Problem Statements

IMPACT
Casualties
Property Damage
Business Interruption
Financial Loss
Environmental Contamination
VICTIM
School Children in Hazard High
Hazard Areas
Care Facilities in High Hazard
Area
Vulnerable Population Exposed to
hazards
THREAT
Increased Fuels due to drought
Hotter, drier climates
More Intense Storms
Impervious surfaces = greater
runoff
Increases of Invasive Species
FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-21
Table 1-7 Problem Statements
Problem
No.

Hazard Area of
Concern
Mitigation
Alternatives
Primary
Agency
Problem Description Related MA
ps-AH-BK-
508
All Hazard Impact ES -
Emergency
Services
City of
Bakersfield
City has generator needs for critical
facilities during PSPS events
ma-AH-BK-
552
ps-DR-BK-
493
Drought Impact PRV -
Prevention ,
PPRO -
Property
Protection
City of
Bakersfield
Drought can lead to lower groundwater
levels and quality and potentially
create undesirable result in
groundwater sustainability plan
ma-DR-BK-
553
ps-DR-BK-
494
Drought Impact PRV -
Prevention ,
NRP - Natural
Resource
Protection
City of
Bakersfield
Drought may increase subsidence and
degrade water quality, including
increase in arsenic and other harmful
chemicals
ma-DR-BK-
553
ps-DR-BK-
495
Drought Threat PRV -
Prevention
City of
Bakersfield
Drought is occurring more often and
for longer periods as a result of climate
change
ma-DR-BK-
553
ps-EQ-BK-
496
Earthquake

PRV -
Prevention
City of
Bakersfield
Levee recertifications are ongoing and
necessary in event of earthquake; last
part of recertification slated between
Chester and Manor on N. side of the
river
ma-EQ-BK-
562
ps-EQ-BK-
497
Earthquake Victim PPRO -
Property
Protection ,
PE&A - Public
Education &
Awareness , SP
- Structural
Projects
City of
Bakersfield
360,000 residents would be subject to
strong shaking resulting from a 7.2
magnitude earthquake on the San
Andreas fault, while 2,650 residents
would be subject to very strong
shaking; 288,000 residents would be
subject to strong shaking resulting
from a 7.2 magnitude earthquake on
the White Wolf fault, while 75,000
residents would be subject to very
strong shaking.
ma-EQ-BK-
554, ma-EQ-
BK-555
ps-EQ-BK-
498
Earthquake Victim PPRO -
Property
Protection , SP
- Structural
Projects
City of
Bakersfield
City has a history of EQ impacts in
downtown (1952) with unreinforced
masonry, especially with basements
under PROW and tunnels
ma-EQ-BK-
554, ma-EQ-
BK-555
ps-EQ-BK-
499
Earthquake Impact PPRO -
Property
Protection , SP
- Structural
Projects
City of
Bakersfield
Potential for liquefaction as closer to
bike path and river according to soil
report – it’s a small area
ma-EQ-BK-
554
FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-22
Problem
No.

Hazard Area of
Concern
Mitigation
Alternatives
Primary
Agency
Problem Description Related MA
ps-FL-BK-
500
Flood

PRV -
Prevention ,
PPRO -
Property
Protection ,
NRP - Natural
Resource
Protection , SP
- Structural
Projects
City of
Bakersfield
Flooding most often occurs as a result
of overflowing retention basins or
prolonged rain events where retention
basins don’t have time to drain down –
will then pump to a different basin or
send to sewer system. Includes
Westchester/downtown (Part Circle
culverts) – central Bakersfield from
Westchester to Oak (F to Oak); east of
Chester; Includes Talisman area,
where City is currently constructing a
lift station.
ma-FL-BK-73,
ma-FL-BK-72,
ma-FL-BK-551,
ma-FL-BK-
550, ma-FL-
BK-114, ma-
FL-BK-115
ps-FL-BK-
501
Flood Victim PRV -
Prevention , SP
- Structural
Projects
City of
Bakersfield
Approximately 29,400 residents living
within or near the 100-year floodplain
and 23,400 within or near 500-year
floodplain. Approximately 129
residents in proximity to floodway.
ma-FL-BK-73,
ma-FL-BK-72,
ma-FL-BK-550
ps-FL-BK-
502
Flood Impact PRV -
Prevention ,
PPRO -
Property
Protection , SP
- Structural
Projects
City of
Bakersfield
4 High Potential Loss Facilities within
100-YR Flood Zone (2 Health Care
Facilities, 1 Home Care Organization,
and 1 Dam)
ma-FL-BK-73,
ma-FL-BK-
550, ma-FL-
BK-551
ps-FL-BK-
503
Flood Impact PRV -
Prevention ,
PPRO -
Property
Protection , SP
- Structural
Projects
City of
Bakersfield
21 Transportation and Lifeline assets
within 100-YR Flood Zone (11 bridges
and 10 transmission line towers)
ma-FL-BK-549
ps-FL-BK-
614
Flood Impact PRV -
Prevention ,
PPRO -
Property
Protection
City of
Bakersfield
The City’s servers, managed by the
Technology Services Department, are
currently housed in the basement of
City Hall South. In the event of a
flooding emergency, City technology
infrastructure has the potential to be
dangerously compromised.
ma-FL-BK-549
FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-23
Problem
No.

Hazard Area of
Concern
Mitigation
Alternatives
Primary
Agency
Problem Description Related MA
ps-SS-BK-
504
Soil Stability Impact PPRO -
Property
Protection ,
NRP - Natural
Resource
Protection , SP
- Structural
Projects
City of
Bakersfield
Some subsidence in downtown area –
streets sinking in somewhat due to soil
composition - including areas such as
H Street, Fairfax, L, 21st & M. There are
a few “minor”, sinking or subsidence
locations on come City streets. The
streets listed are some and most of
them have already been repaired
including H Street, 21st St, and L St. I
would not list it as a Citywide problem.

Also to my knowledge we have never
had a Geotechnical study done of the
soil itself to determine if it is truly a
“subsidence” or soil stability problem or
possibly poor compaction, former
tunnel, or other possible cause
ma-SS-BK-558
ps-WF-BK-
505
Wildfire Impact PPRO -
Property
Protection ,
PE&A - Public
Education &
Awareness
City of
Bakersfield
Property damage resulting from
wildfire encroachment at the wildland-
urban interface.
ma-WF-BK-
559, ma-WF-
BK-560
ps-WF-BK-
506
Wildfire Victim PPRO -
Property
Protection ,
PE&A - Public
Education &
Awareness , ES
- Emergency
Services
City of
Bakersfield
Approximately 79,000 residents living
within moderate wildfire risk areas
(mostly in northeastern part of the
city) and 4,100 within high risk areas.at
the eastern edge of the city. 4 Essential
Facilities within moderate wildfire risk
areas (2 fire stations, 1 sheriff facility,
and 1 emergency operations center); 79
High Potential Loss Facilities within
moderate wildfire risk areas, including
29 special needs facilities, 15 childcare
centers, 12 schools, and 7 adult care
facilities,
ma-WF-BK-
560
ps-WF-BK-
507
Wildfire Threat PPRO -
Property
Protection ,
PE&A - Public
Education &
Awareness
City of
Bakersfield
SE portion of City requires hazard
reduction efforts (most likely through
code enforcement and fire prevention
efforts in coordination with County)
ma-WF-BK-
559, ma-WF-
BK-560
FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-24
Problem
No.

Hazard Area of
Concern
Mitigation
Alternatives
Primary
Agency
Problem Description Related MA
ps-WF-BK-
509
Wildfire Threat PRV -
Prevention ,
PPRO -
Property
Protection ,
PE&A - Public
Education &
Awareness
City of
Bakersfield
City is experiencing increased
vegetative fuel resulting from climate-
related drought.
ma-WF-BK-
560, ma-WF-
BK-561

1.4.4.1 Mitigation Action Support Tool (MAST)
As a living document, hazard problem statements and mitigation activities will be updated through a web interface application developed specifically for participating jurisdictions. The Mitigation Action Support Tool (MAST) is accessible through http://mitigatehazards.com/county-of-kern/.

MAST is a web -based interactive tool that enables multiple users to search, view, enter, and update mitigation actions, ideas or projects, and other information. MAST provides participating jurisdictions and plan reviewers (Cal OES/FEMA) access to valuable mitigation information that can be leveraged by future planning or other risk reduction efforts within the County. Participating jurisdictions can update the status of their mitigation projects throughout the planning lifecycle, and this web -based tool will improve participating jurisdiction’s ability to apply for FEMA’s Hazard Mitigation Assistance (HMA) grant programs including initial grant application processes through Cal OES.

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-25

1.5 Mitigation Strategy
The mitigation strategy is the guidebook to future hazard mitigation administration, capturing the key outcomes of the MJHMP planning process. The mitigation strategy is intended to reduce vulnerabilities outlined in the previous section (a.k.a. problem statements) with a prescription of policies and physical projects. These mitigation actions should be compatible with existing planning mechanisms and should outline specific roles and resources for implementation success.

1.5.1 Capabilities Assessment
This section examines the planning and regulatory, administrative, technical, financial, educational, and outreach capabilities to augment known issues and weaknesses from identified natural hazards.

The tables in this section explore various local planning mechanisms, administrative capacity, financial capabilities, and education and outreach initiatives. The columns in each table represent deeper dives into the following questions:
▪ Is the existing planning or regulatory mechanism used currently? (Column 1, Status) ▪ Has the HMP been integrated into the planning mechanism currently so that the named mechanism is currently used in HMP planning? (Column 2, Current Mitigation Use) ▪ Is there a future opportunity to expand, improve upon, and incorporate this 2020 HMP Update into the planning or regulatory mechanism? (Column 3, Future Opportunity) The capabilities assessment is easily-digestible and based on color coding to indicate which policies and plans are adequate, need impr ovement or in which the HMP could be integrated. Each table includes a legend that explain how each one of these questions are being answered according to the color indicated:
green, yellow, and orange.

For more information on the regulatory environment su rrounding each hazard, see hazard -specific sections of Volume 1. Volume 1, Section 5.3.5 includes an extensive list of federal and state funding opportunities as well.

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-26

1.5.1.1 Planning and Regulatory Capabilities
Table 1-8. Planning and Regulatory Capabilities Summary

CAPABILITY ASSESSMENT LEGEND
Status Current Mitigation Use Future Opportunity
Currently in use or present. Used widely for mitigation. Opportunity to expand and integrate. (Sort of) Seldomly used or limited
presence. Limited use in mitigation planning. Limited opportunity to expand and integrate. (No) Not present or available. Not used in mitigation planning. No opportunity to expand or integrate.

HMP Integration
Notes / Additional Detail Resource Status
Current
Mitigation
Use
Future
Opportunity
Planning and Regulatory Capabilities
Construction and Future Development Regulations
Building Codes
Green Green Yellow
Title 15 of the Bakersfield Municipal Code (BMC) -
Buildings and Construction
https://bakersfield.municipal.codes/Code/15
BCEGS Rating Green Green Green
Public Protection (ISO Class) Green Green Green ISO Rating: Class 2 Hazard Related Development
Standards
Green Green Green
BMC Title 15 - Buildings and Construction
-15.05.070 -Geologic or Flood Hazards
-15.40 - Earthquake Hazard Reduction in Existing
Unreinforced Masonry Bearing Wall Buildings
-15.41 Seismic Safety Administration of
Unreinforced Masonry Buildings
BMC Chapter 15.74 - Flood Damage Protection
Zoning Ordinance Green Yellow Green Title 17 of the BMC - Zoning https://bakersfield.municipal.codes/Code/17
Hazard-Specific Ordinance
Green Yellow Green
BMC Chapter 17.42 - FP-P Floodplain Primary Zone
BMC Chapter 17.44 - FP-S Floodplain Secondary
Zone
BMC Chapter 17.66 - HD (Hillside Development)
Combining Zone
Growth Management Ordinance Orange Orange Yellow
Hazard Reduction Programs (Annually Conducted)
Capital Improvements Program
(CIP) or Plan Green Yellow Green
Erosion/Sediment Control
Program Orange Orange Yellow
FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-27
HMP Integration
Notes / Additional Detail Resource Status
Current
Mitigation
Use
Future
Opportunity
Planning and Regulatory Capabilities
Hazard-Related Public Outreach
Program Orange Orange Yellow See Education and Outreach Resource Capabilities.

Stormwater Management
Program (Annual Inspections) Green Green Green
Seismic Safety Program (Non-
structural) Orange Orange Green
Earthquake Modernization Plan
(Building Safety) Orange Orange Green
Hazard Plans
General Plan Safety Element Green Yellow Green
Community Wildfire Protection
Plan (CWPP) Yellow Green Green Countywide CWPP expected 2021.

Floodplain Management Plan Green Green Orange
Stormwater Management Plan
Green Green Yellow
The City's Stormwater Management Plan is
coordinated between Public Works, Water
Resources, and Development services
City of Bakersfield shares joint National Pollutant
Discharge Elimination System (NPDES) with Kern
County - last updated 2016.

City of Bakersfield submits annual reports to the
Central Valley Regional Water Quality Control
Board
Emergency Operations Plan Green Yellow Green
Climate Action Plan Orange Orange Green Will be prepared as part of General Plan update Ground Water Management
Planning / Plans
Green Green Yellow
Sustainble Groundwater Management Act (SGMA)
planning; The City of Bakersfield participates in the
Kern River Groundwater Sustainability Agency - a
subset of KRGSA is the Groundwater Sustainability
Plan (GSP)
National Flood Protection Program (NFIP)
Floodplain Management
Regulations Green Yellow
Flood Insurance Education and
Technical Assist. Orange Orange Green
Flood Hazard Mapping / Re-
Mapping Green Green Green Re-mapping currently underway Community Rating System
(CRS) Green Yellow Green
FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-28

1.5.1.2 Administrative and Technical Capabilities
Table 1-9. Administrative and technical capabilities summary

CAPABILITY ASSESSMENT LEGEND
Status Current Mitigation Use Future Opportunity
Currently in use or present. Used widely for mitigation. Opportunity to expand and integrate. (Sort of) Seldomly used or limited
presence. Limited use in mitigation planning. Limited opportunity to expand and integrate. (No) Not present or available. Not used in mitigation planning. No opportunity to expand or integrate.

HMP Integration
Notes / Additional Detail Resource Status
Current
Mitigation
Use
Future
Opportunity
Administrative and Technical
Community Planning and Development Services
Community Planner Green Yellow Yellow Planning Director Civil Engineer Green Yellow Green Public Works Director Building Code Official (Full time
or Augmented) Green Yellow Green Building Director
Floodplain Administrator Green Green Green Building Director; with assistance from Water Resources
Fire Marshal Green Green Green Fire Chief
Dedicated Public Outreach
Personnel Green Yellow Green Public Information Office - City Manager's Office GIS Specialist and Capability Green Yellow Green GIS capabilities in Development Services and Technology Services Departments
Emergency Manager Green Yellow Green City Manager
Full-Time Building Official Green Yellow Green Building Director Grant Manager, Writer, or
Specialist Orange Orange Green
Other N/A N/A N/A
Warning Systems/Services
General Yellow Orange Green The City has a voluntary mobile application for notifications - Atlas One
Flood Orange Orange Green
Wildfire Orange Orange Green
Geological Hazards Orange Orange Green

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-29

1.5.1.3 Financial Capabilities
Table 1-10. Financial capabilities summary

CAPABILITY ASSESSMENT LEGEND
Status Current Mitigation Use Future Opportunity
Currently in use or present. Used widely for mitigation. Opportunity to expand and integrate. (Sort of) Seldomly used or limited
presence. Limited use in mitigation planning. Limited opportunity to expand and integrate. (No) Not present or available. Not used in mitigation planning. No opportunity to expand or integrate.

HMP Integration
Notes / Additional Detail Resource Status
Current
Mitigation
Use
Future
Opportunity
Fiscal Capabilities
Financial Resources for Hazard Mitigation
Levy for Specific Purposes with
Voter Approval Orange Orange Green
Utilities Fees
Green Yellow Orange
BMC Chapter 3.04.130 - All moneys deposited to
the roads program utility franchise fee and
surcharge fund shall be used for the purpose of
funding capital improvements related to the city’s
roads program, including, but not limited to, the
payment of debt service or other types of payments
related to obligations incurred in connection with
the financing of such capital improvements
Benefit assessments Yellow Yellow Green
System Development Fee Yellow Yellow Green
General Obligation Bonds to
Incur Debt Orange Orange Green
Special Tax Bonds to Incur Debt Orange Orange Green
Withheld Spending in Hazard-
Prone Areas Yellow Yellow Green
Stormwater Service Fees
Yellow Yellow Green
Kern River Levee special district under LAFCO.

Revenue comes to City Water Resources
Department to assist with levee maintenance
Capital Improvement Project
Funding Green Yellow Green

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-30

1.5.1.4 Education and Outreach
Table 1-11. Education and outreach capabilities summary

CAPABILITY ASSESSMENT LEGEND
Status Current Mitigation Use Future Opportunity
Currently in use or present. Used widely for mitigation. Opportunity to expand and integrate. (Sort of) Seldomly used or limited
presence. Limited use in mitigation planning. Limited opportunity to expand and integrate. (No) Not present or available. Not used in mitigation planning. No opportunity to expand or integrate.

HMP Integration
Notes / Additional Detail Resource Status
Current
Mitigation
Use
Future
Opportunity
Education / Outreach Capabilities
Education/Outreach Resources
Website Dedicated to Hazard
Topics Orange Orange Green
Dedicated Social Media Green Yellow Green
Hazard Info. Avail. at Library/
Planning Desk Yellow Yellow Green
Annual Public Safety Events Green Yellow Green
Ability to Field Public Tech.

Assistance Requests Yellow Yellow Green
Public Safety Newsletters or
Printed Outreach Yellow Yellow Green
Fire Safe Councils Orange Orange Green
Resource Conservation Districts
Yellow Orange Green
Improvement District-4; provides water
conversation educational materials. Captures 75%
of elementary schools within City.

Other N/A N/A N/A

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-31

1.5.2 Mitigation Actions
Mitigation actions were developed based upon the
jurisdiction’s priorities, risk assessment results, and mitigation alternatives. The mitigation action
prioritization method used by all participating
jurisdictions is described in Section 5.5.1 of Volume 1.

Table 1-12 lists each priority mitigation action,
responsible party, time frame, potential funding source, implementation steps, and resources need to
implement based upon the Planning Co mmittee
consensus.

Each participating jurisdiction , including the City of Bakersfield, considered ongoing relevancy of
mitigation actions from the existing MJHMP and
retained or removed such actions while adding new
relevant actions as well. Mitigation actions were
examined for relevancy and the potential for future
implementation and then evaluated for potential
follow-up. Some mitigation actions developed during
the previous HMP effort were not included because
they were an inherent part of the HMP update process
or were not d etailed enough for implementation at a
local Jurisdiction level. the City of Bakersfield has
made significant changes to other mitigation actions
because of the updated risk assessment and
implementation strategy, to include more detail, or to
update based on current mitigation practices. Volume 1, Section 5.5.2 provides a record of County wide mitigation actions, the status, and additional notes for each action.

Table 1-12 lists each mitigation action for the City of Bakersfield. Each participating jurisdiction developed unique mitigation actions, targeted at their own unique priorities and vulnerabilities . Each mitigation action identifies the responsible party, time frame, potential funding source, implementation steps and resources needed to implement these priority mitigation actions. As a living document, hazard problem statements and mitigation activities will be updated through MAST. The detail in Table 1-12 meets the regulatory requirements of FEMA and DMA 2000.

Figure 1-12. Mitigation Action Key

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-32

INTENTIONAL BLANK PAGE

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-33
Table 1-12. City of Bakersfield Mitigation Actions
Mitigation No. Hazard
Type
Mitigation
Type
Status Year Primary
Agency
Title/Description Responsible
Party
Estimated Cost Estimated Benefit Time
Frame
HMA
Activity
Type
Potential Grant
Source
Priority Related
Problem
Statements
ma-AH-BK-552 All Hazard SP -
Structural
Projects
Pending 2020 City of
Bakersfield
Install emergency backup
generators for fire stations where
not currently installed, emergency
shelters, animal shelter, wastewater
lift stations, and City office
facilities. City has particular need
for generator in Fire Station #3.

Building and
Public Works
High - Existing funding will not
cover the cost of the project;
implementation would require new
revenue through an alternative
source (for example, bonds, grants,
and fee increases).

High - Project will provide
an immediate reduction of
risk exposure for life and
property.
3-5 Years 5% HMGP / BRIC High ps-AH-BK-508
ma-DR-BK-553 Drought NRP -
Natural
Resource
Protection
Pending 2020 City of
Bakersfield
Install drought tolerant landscaping
in the public right of way and City-
owned buildings and facilities.

Public Works Medium - The project could be
implemented with existing funding
but would require a re-
apportionment of the budget or a
budget amendment, or the cost of
the project would have to be spread
over multiple years.

Medium - Project will have
a long-term impact on the
reduction of risk exposure
for life and property, or
project will not provide an
immediate reduction in the
risk exposure for property.
1-3 Years Project HMGP / BRIC Low ps-DR-BK-493,
ps-DR-BK-494,
ps-DR-BK-495
ma-EQ-BK-554 Earthquake PE&A -
Public
Education &
Awareness
Pending 2020 City of
Bakersfield
Conduct outreach to encourage
privately owned critical facilities
(e.g. churches, hotels, other
gathering facilities) to evaluate the
ability of the buildings to withstand
earthquakes and to address any
deficiencies identified.

Public
Information
Office
Low - The project could be funded
under the existing budget. The
project is part of or can be part of
an ongoing existing program.

Medium - Project will have
a long-term impact on the
reduction of risk exposure
for life and property, or
project will not provide an
immediate reduction in the
risk exposure for property.

Ongoing 5% HMGP / BRIC Low ps-EQ-BK-497,
ps-EQ-BK-498,
ps-EQ-BK-499
ma-EQ-BK-555 Earthquake PPRO -
Property
Protection
Pending 2020 City of
Bakersfield
Install seismic shut-off valves on
gas fixtures on City-owned
facilities.

Public Works Medium - The project could be
implemented with existing funding
but would require a re-
apportionment of the budget or a
budget amendment, or the cost of
the project would have to be spread
over multiple years.

High - Project will provide
an immediate reduction of
risk exposure for life and
property.
1-3 Years Project HMGP / BRIC High ps-EQ-BK-497,
ps-EQ-BK-498
ma-EQ-BK-562 Earthquake PRV -
Prevention
Ongoing 2020 City of
Bakersfield
Continue pursuing levee
recertification between Chester and
Manor on the north side of the Kern
River
Public Works High - Existing funding will not
cover the cost of the project;
implementation would require new
revenue through an alternative
source (for example, bonds, grants,
and fee increases).

High - Project will provide
an immediate reduction of
risk exposure for life and
property.

Ongoing N/A Internal Funding Extreme ps-EQ-BK-496
ma-FL-BK-114 Flood SP -
Structural
Projects
Pending 2005 City of
Bakersfield
Divert flow at Landfair Sump to
reduce flooding impacts
City of
Bakersfield
Public Works
Medium - The project could be
implemented with existing funding
but would require a re-
apportionment of the budget or a
budget amendment, or the cost of
the project would have to be spread
over multiple years.

High - Project will provide
an immediate reduction of
risk exposure for life and
property.

Funding
Dependent
Project HMGP / BRIC Medium ps-FL-BK-500
FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-34
Mitigation No. Hazard
Type
Mitigation
Type
Status Year Primary
Agency
Title/Description Responsible
Party
Estimated Cost Estimated Benefit Time
Frame
HMA
Activity
Type
Potential Grant
Source
Priority Related
Problem
Statements
ma-FL-BK-115 Flood PPRO -
Property
Protection
Pending 2005 City of
Bakersfield
Complete Elcia and Real drainage
project to connect to county storm
drain system
City of
Bakersfield
Public Works
Medium - The project could be
implemented with existing funding
but would require a re-
apportionment of the budget or a
budget amendment, or the cost of
the project would have to be spread
over multiple years.

High - Project will provide
an immediate reduction of
risk exposure for life and
property.

Funding
Dependent
Project HMGP / BRIC Medium ps-FL-BK-500
ma-FL-BK-72 Flood PRV -
Prevention
Pending 2014 City of
Bakersfield
Continue to Implement Sound
Floodplain Management Practices
through Participation in the
National Flood Insurance Program
Building
Division,
Planning
Division, Public
Works
Department,
Water
Resources
Department
Low - The project could be funded
under the existing budget. The
project is part of or can be part of
an ongoing existing program.

High - Project will provide
an immediate reduction of
risk exposure for life and
property.

Ongoing Planning HMGP / BRIC ,
FMA
Medium ps-FL-BK-500,
ps-FL-BK-501
ma-FL-BK-73 Flood PPRO -
Property
Protection
Pending 2014 City of
Bakersfield
Implement Citywide Drainage Basin
Maintenance Projects: Basins #212,
#139, #55, #69, #277
0 Medium - The project could be
implemented with existing funding
but would require a re-
apportionment of the budget or a
budget amendment, or the cost of
the project would have to be spread
over multiple years.

High - Project will provide
an immediate reduction of
risk exposure for life and
property.
3-5 Years Project HMGP / BRIC ,
FMA
Medium ps-FL-BK-500,
ps-FL-BK-501,
ps-FL-BK-502
ma-FL-BK-549 Flood PPRO -
Property
Protection
Pending 2020 City of
Bakersfield
Technology Services City Server
Relocation
Public Works
and Building
High - Existing funding will not
cover the cost of the project;
implementation would require new
revenue through an alternative
source (for example, bonds, grants,
and fee increases).

High - Project will provide
an immediate reduction of
risk exposure for life and
property.
3-5 Years Project HMGP / BRIC High ps-FL-BK-614,
ps-FL-BK-503
ma-FL-BK-550 Flood PPRO -
Property
Protection
Pending 2020 City of
Bakersfield
Installation of backup generators for
storm water pump stations at
critical locations throughout the
City, including along Highway
construction projects and locations
adjacent to residential
neighborhoods.

Public Works Medium - The project could be
implemented with existing funding
but would require a re-
apportionment of the budget or a
budget amendment, or the cost of
the project would have to be spread
over multiple years.

Medium - Project will have
a long-term impact on the
reduction of risk exposure
for life and property, or
project will not provide an
immediate reduction in the
risk exposure for property.
3-5 Years Project HMGP / BRIC Medium ps-FL-BK-501,
ps-FL-BK-502,
ps-FL-BK-500
ma-FL-BK-551 Flood PPRO -
Property
Protection
Pending 2020 City of
Bakersfield
Incorporate the SCADA system
mechanism for pump lift stations.

Public Works Medium - The project could be
implemented with existing funding
but would require a re-
apportionment of the budget or a
budget amendment, or the cost of
the project would have to be spread
over multiple years.

Medium - Project will have
a long-term impact on the
reduction of risk exposure
for life and property, or
project will not provide an
immediate reduction in the
risk exposure for property.
3-5 Years Project HMGP / BRIC ,
FMA
Medium ps-FL-BK-502,
ps-FL-BK-500
FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-35
Mitigation No. Hazard
Type
Mitigation
Type
Status Year Primary
Agency
Title/Description Responsible
Party
Estimated Cost Estimated Benefit Time
Frame
HMA
Activity
Type
Potential Grant
Source
Priority Related
Problem
Statements
ma-SS-BK-558 Soil
Stability
PPRO -
Property
Protection
Ongoing 2020 City of
Bakersfield
Conduct subsidence investigations
in downtown Bakersfield, including
areas such as H Street, Fairfax, L,
21st & M
Public Works High - Existing funding will not
cover the cost of the project;
implementation would require new
revenue through an alternative
source (for example, bonds, grants,
and fee increases).

High - Project will provide
an immediate reduction of
risk exposure for life and
property.
3-5 Years Planning HMGP / BRIC High ps-SS-BK-504
ma-WF-BK-559 Wildfire ES -
Emergency
Services
Ongoing 2020 City of
Bakersfield
Implement additional fire
protection code enforcement and
coordinate potential shared
enforcement with County
City
Administration,
Planning
Medium - The project could be
implemented with existing funding
but would require a re-
apportionment of the budget or a
budget amendment, or the cost of
the project would have to be spread
over multiple years.

High - Project will provide
an immediate reduction of
risk exposure for life and
property.

Ongoing N/A Internal Funding High ps-WF-BK-507,
ps-WF-BK-505
ma-WF-BK-560 Wildfire PE&A -
Public
Education &
Awareness
Pending 2020 City of
Bakersfield
Develop public outreach program
for residents in WUI areas of city,
including improved website content
and targeted outreach.

POI Low - The project could be funded
under the existing budget. The
project is part of or can be part of
an ongoing existing program.

High - Project will provide
an immediate reduction of
risk exposure for life and
property.
1-3 Years 5% HMGP / BRIC ,

AFG , EMPG
High ps-WF-BK-505,
ps-WF-BK-506,
ps-WF-BK-507,
ps-WF-BK-509
ma-WF-BK-561 Wildfire PPRO -
Property
Protection
Pending 2020 City of
Bakersfield
Implement fuels reduction program
around City-owned critical facilities
Public Works Medium - The project could be
implemented with existing funding
but would require a re-
apportionment of the budget or a
budget amendment, or the cost of
the project would have to be spread
over multiple years.

High - Project will provide
an immediate reduction of
risk exposure for life and
property.
1-3 Years N/A AFG , FP&S ,
Internal Funding
Extreme ps-WF-BK-509

FEMA/Cal OES Submission 05-19-2021
Kern Multi-Jurisdiction 2020 MJHMP Update

COUNTY OF KERN

1-36

INTENTIONAL BLANK PAGE

City of Bakersfield I-1
2025 Urban Water Management Plan
Appendix I:202
5 Municipal Water System
Water Rate Schedules
RESOLUTION NO. 069-- 2025

A RESOLUTION ADOPTING INCREASES TO WATER
RATES FOR . CITY DOMESTIC WATER SERVICE AREA
FOR FISCAL YEAR 2026 THRU 2030.

WHEREAS, Chapter 14.04 of the Bakersfield Municipal Code authorizes the City Council to establish, rates and fees sufficient for the City to recover the costs of providing domestic water services; and
WHEREAS, City staff hired a consultant to develop a rate study for the Domestic Water System in 2023; and
WHEREAS, City staff developed a ten- year infrastructure master plan in 2025 and identified insufficient funding from the previously approved rate structure; and WHEREAS, City staff developed a 2025 Supplemental Report to address inadequacies of forecasted revenues and expenditures to determine proposed rate changes; and
WHEREAS, the proposed changes were presented to the Water Board Committee on March 12, 2025 and to City Council on March 26, 2025; and WHEREAS, City staff was given permission to move forward with the proposed changes; and
WHEREAS, City staff prepared and mailed a notice of public hearing to residential and commercial users on April 25, 2025 as required by Proposition 218 notifying them of the . proposed. rate increases ,( Cal. Constitution Article XIID, section 6); and
WHEREAS, a public hearing was held on June 11, 2025 in order to receive evidence and hear all persons interested in supporting or objecting to the proposed rate increases; and
WHEREAS, the adoption of water rate increases is exempt from the California Environmental Quality Act ( CEQA) under the California Public Resources Code Section 21080( b) ( 8) because said water rates increases are, among other things related to domestic water service, for the purpose of meeting operating expenses, purchasing supplies, equipment, and/ or materials, meeting financial reserve needs and requirements, and for obtaining funds for capital projects necessary to maintain service within City' s existing service areas; and
c' s
OORIGINPc

Page 1 of 3 ends
← All documents from this meeting