Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 403 0 61 0 1567 724 330 1482 0 Future Volume (veh/h) 0 0 0 403 0 61 0 1567 724 330 1482 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 453 0 69 0 1761 813 371 1665 0 Peak Hour Factor 0.95 0.95 0.95 0.89 0.95 0.89 0.95 0.89 0.89 0.89 0.89 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 3 0 630 0 561 0 2428 1025 488 3527 0
Arrive On Green 0.00 0.00 0.00 0.17 0.00 0.17 0.00 0.47 0.47 0.14 0.68 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 453 0 69 0 1761 813 371 1665 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 6.5 0.0 1.0 0.0 15.0 20.5 5.6 8.3 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 6.5 0.0 1.0 0.0 15.0 20.5 5.6 8.3 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 3 0 630 0 561 0 2428 1025 488 3527 0 V/C Ratio(X) 0.00 0.00 0.00 0.72 0.00 0.12 0.00 0.73 0.79 0.76 0.47 0.00 Avail Cap(c_a), veh/h 0 273 0 1122 0 1703 0 2460 1034 512 3595 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 21.4 0.0 19.1 0.0 11.7 7.2 22.7 4.1 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 1.6 0.0 0.1 0.0 1.1 4.3 6.3 0.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 2.5 0.0 0.3 0.0 3.9 4.4 2.3 0.7 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 22.9 0.0 19.2 0.0 12.8 11.5 29.0 4.2 0.0 LnGrp LOS C B B B C A
Approach Vol, veh/h 0 522 2574 2036
Approach Delay, s/veh 0.0 22.4 12.4 8.8
Approach LOS C B A
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 11.6 29.7 13.5 0.0 41.3 13.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 26.0 17.0 8.0 38.0 29.0 Max Q Clear Time (g_c+I1), s 7.6 22.5 8.5 0.0 10.3 3.0
Green Ext Time (p_c), s 0.1 3.1 1.1 0.0 12.9 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 12.0
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/20/2025 Existing Year 2025 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 157 324 63 199 521 324 243 1596 163 259 964 439 Future Volume (veh/h) 157 324 63 199 521 324 243 1596 163 259 964 439 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 176 364 71 224 585 364 273 1793 183 291 1083 493 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 227 1288 395 291 1382 423 344 2013 205 351 2193 681 Arrive On Green 0.06 0.25 0.25 0.08 0.27 0.27 0.10 0.42 0.42 0.10 0.42 0.42 Sat Flow, veh/h 3510 5187 1589 3510 5187 1588 3510 4784 486 3510 5187 1610 Grp Volume(v), veh/h 176 364 71 224 585 364 273 1294 682 291 1083 493 Grp Sat Flow(s),veh/h/ln 1755 1729 1589 1755 1729 1588 1755 1729 1812 1755 1729 1610 Q Serve(g_s), s 5.3 6.1 3.8 6.8 10.1 23.6 8.2 37.4 37.8 8.8 16.5 27.5 Cycle Q Clear(g_c), s 5.3 6.1 3.8 6.8 10.1 23.6 8.2 37.4 37.8 8.8 16.5 27.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.27 1.00 1.00
Lane Grp Cap(c), veh/h 227 1288 395 291 1382 423 344 1455 762 351 2193 681 V/C Ratio(X) 0.77 0.28 0.18 0.77 0.42 0.86 0.79 0.89 0.89 0.83 0.49 0.72 Avail Cap(c_a), veh/h 227 1392 427 390 1632 500 487 1504 789 357 2193 681 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 49.7 32.8 32.0 48.5 32.8 37.7 47.7 29.0 29.1 47.7 22.8 25.9 Incr Delay (d2), s/veh 15.2 0.1 0.2 6.5 0.2 12.6 5.9 6.8 12.5 14.7 0.2 3.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.7 2.5 1.4 3.1 4.1 10.2 3.7 15.2 17.3 4.4 6.1 10.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 64.9 32.9 32.2 55.0 33.0 50.3 53.5 35.8 41.6 62.4 22.9 29.8 LnGrp LOS E C C D C D D D D E C C
Approach Vol, veh/h 611 1173 2249 1867
Approach Delay, s/veh 42.1 42.5 39.7 30.9
Approach LOS D D D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.8 49.4 13.0 30.8 14.6 49.7 11.0 32.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 47.0 12.0 29.0 15.0 43.0 7.0 34.0 Max Q Clear Time (g_c+I1), s 10.8 39.8 8.8 8.1 10.2 29.5 7.3 25.6 Green Ext Time (p_c), s 0.0 5.7 0.2 2.3 0.4 7.0 0.0 3.2 Intersection Summary
HCM 7th Control Delay, s/veh 37.7
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 199 0 240 0 0 0 102 603 0 0 996 112 Future Volume (veh/h) 199 0 240 0 0 0 102 603 0 0 996 112 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 216 0 261 0 0 0 111 655 0 0 1083 122 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 611 0 0 0 5 0 329 3111 0 0 2038 624
Arrive On Green 0.17 0.00 0.00 0.00 0.00 0.00 0.09 0.60 0.00 0.00 0.39 0.39 Sat Flow, veh/h 3510 216 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 216 13.2 0 0 0 111 655 0 0 1083 122 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 1.9 0.0 0.0 0.0 1.0 2.0 0.0 0.0 5.7 1.8 Cycle Q Clear(g_c), s 1.9 0.0 0.0 0.0 1.0 2.0 0.0 0.0 5.7 1.8 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 611 0 5 0 329 3111 0 0 2038 624
V/C Ratio(X) 0.35 0.00 0.00 0.00 0.34 0.21 0.00 0.00 0.53 0.20 Avail Cap(c_a), veh/h 2777 0 1557 0 496 4543 0 0 3224 988 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 12.9 0.0 0.0 0.0 15.0 3.2 0.0 0.0 8.2 7.1 Incr Delay (d2), s/veh 0.3 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 0.0 0.0 0.3 0.0 0.0 0.0 1.0 0.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.2 0.0 0.0 0.0 15.6 3.3 0.0 0.0 8.5 7.2 LnGrp LOS B B A A A
Approach Vol, veh/h 0 766 1205
Approach Delay, s/veh 0.0 5.1 8.3
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 25.2 7.3 17.9 10.2 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 4.0 3.0 7.7 3.9 0.0
Green Ext Time (p_c), s 4.2 0.0 6.2 0.7 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.7
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 132 765 185 202 374 151 87 479 188 366 771 91 Future Volume (veh/h) 132 765 185 202 374 151 87 479 188 366 771 91 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.98 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 142 823 199 217 402 162 94 515 202 394 829 98 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 252 1500 456 314 1592 484 222 1124 343 546 1603 490 Arrive On Green 0.07 0.29 0.29 0.09 0.31 0.31 0.06 0.22 0.22 0.16 0.31 0.31 Sat Flow, veh/h 3510 5187 1576 3510 5187 1578 3510 5187 1585 3510 5187 1587 Grp Volume(v), veh/h 142 823 199 217 402 162 94 515 202 394 829 98 Grp Sat Flow(s),veh/h/ln 1755 1729 1576 1755 1729 1578 1755 1729 1585 1755 1729 1587 Q Serve(g_s), s 2.5 8.6 6.6 3.9 3.7 5.1 1.7 5.5 7.3 6.9 8.4 2.9 Cycle Q Clear(g_c), s 2.5 8.6 6.6 3.9 3.7 5.1 1.7 5.5 7.3 6.9 8.4 2.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 252 1500 456 314 1592 484 222 1124 343 546 1603 490 V/C Ratio(X) 0.56 0.55 0.44 0.69 0.25 0.33 0.42 0.46 0.59 0.72 0.52 0.20 Avail Cap(c_a), veh/h 328 2747 835 328 2747 836 328 2747 839 547 3070 939 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.8 19.3 18.6 28.4 16.7 17.2 28.9 21.9 22.6 25.8 18.2 16.3 Incr Delay (d2), s/veh 2.0 0.3 0.7 5.8 0.1 0.4 1.3 0.3 1.6 4.6 0.3 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 3.0 2.2 1.7 1.3 1.6 0.7 2.0 2.6 2.9 2.8 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.8 19.6 19.2 34.2 16.8 17.6 30.2 22.2 24.2 30.4 18.5 16.5 LnGrp LOS C B B C B B C C C C B B
Approach Vol, veh/h 1164 781 811 1321
Approach Delay, s/veh 20.9 21.8 23.6 21.9
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.0 17.9 9.7 22.6 8.1 23.8 8.6 23.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 34.0 6.0 34.0 6.0 38.0 6.0 34.0 Max Q Clear Time (g_c+I1), s 8.9 9.3 5.9 10.6 3.7 10.4 4.5 7.1 Green Ext Time (p_c), s 0.2 3.8 0.0 6.2 0.0 5.9 0.1 3.1 Intersection Summary
HCM 7th Control Delay, s/veh 21.9
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 57 87 180 84 36 71 96 675 60 52 1074 55 Future Volume (veh/h) 57 87 180 84 36 71 96 675 60 52 1074 55 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 64 98 202 94 40 80 108 758 67 58 1207 62 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 101 331 281 122 354 296 140 2043 620 95 1915 581 Arrive On Green 0.06 0.17 0.17 0.07 0.19 0.19 0.08 0.39 0.39 0.05 0.37 0.37 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 64 98 202 94 40 80 108 758 67 58 1207 62 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 2.0 2.6 6.8 3.0 1.0 2.5 3.4 6.0 1.6 1.8 11.0 1.5 Cycle Q Clear(g_c), s 2.0 2.6 6.8 3.0 1.0 2.5 3.4 6.0 1.6 1.8 11.0 1.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 101 331 281 122 354 296 140 2043 620 95 1915 581 V/C Ratio(X) 0.64 0.30 0.72 0.77 0.11 0.27 0.77 0.37 0.11 0.61 0.63 0.11 Avail Cap(c_a), veh/h 282 1283 1088 188 1185 990 219 3055 927 251 3144 955 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.7 20.7 22.5 26.5 19.5 20.1 26.1 12.4 11.1 26.8 15.0 12.0 Incr Delay (d2), s/veh 6.5 0.5 3.4 9.8 0.1 0.5 8.7 0.1 0.1 6.2 0.3 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 1.1 2.7 1.5 0.4 0.9 1.6 1.8 0.5 0.8 3.4 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 33.2 21.2 25.9 36.3 19.7 20.6 34.9 12.5 11.2 33.0 15.3 12.0 LnGrp LOS C C C D B C C B B C B B
Approach Vol, veh/h 364 214 933 1327
Approach Delay, s/veh 26.0 27.3 15.0 15.9
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.0 26.7 7.9 16.1 8.5 25.3 7.2 16.8 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 8.0 34.0 6.0 39.0 7.0 35.0 9.0 36.0 Max Q Clear Time (g_c+I1), s 3.8 8.0 5.0 8.8 5.4 13.0 4.0 4.5 Green Ext Time (p_c), s 0.0 5.1 0.0 1.2 0.0 8.3 0.0 0.5 Intersection Summary
HCM 7th Control Delay, s/veh 17.8
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 24 993 6 3 1494 24 9 2 2 50 0 47 Future Volume (veh/h) 24 993 6 3 1494 24 9 2 2 50 0 47
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 26 1079 7 3 1624 26 10 2 2 54 0 51 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 58 2496 16 7 2322 37 359 72 43 265 43 148
Arrive On Green 0.03 0.47 0.47 0.00 0.44 0.44 0.19 0.19 0.19 0.19 0.00 0.19 Sat Flow, veh/h 1810 5317 34 1810 5256 84 969 373 224 586 223 764 Grp Volume(v), veh/h 26 702 384 3 1068 582 14 0 0 105 0 0 Grp Sat Flow(s),veh/h/ln 1810 1729 1894 1810 1729 1882 1565 0 0 1573 0 0 Q Serve(g_s), s 0.5 4.9 4.9 0.1 9.0 9.0 0.0 0.0 0.0 0.1 0.0 0.0 Cycle Q Clear(g_c), s 0.5 4.9 4.9 0.1 9.0 9.0 0.2 0.0 0.0 1.9 0.0 0.0 Prop In Lane 1.00 0.02 1.00 0.04 0.71 0.14 0.51 0.49
Lane Grp Cap(c), veh/h 58 1623 889 7 1527 831 475 0 0 456 0 0 V/C Ratio(X) 0.45 0.43 0.43 0.40 0.70 0.70 0.03 0.00 0.00 0.23 0.00 0.00 Avail Cap(c_a), veh/h 251 1725 945 251 1725 939 1205 0 0 1212 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 17.2 6.4 6.4 17.9 8.1 8.1 11.8 0.0 0.0 12.5 0.0 0.0 Incr Delay (d2), s/veh 5.5 0.2 0.3 31.7 1.1 2.0 0.0 0.0 0.0 0.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.7 0.8 0.1 1.6 2.0 0.1 0.0 0.0 0.6 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 22.6 6.6 6.7 49.7 9.2 10.1 11.8 0.0 0.0 12.7 0.0 0.0 LnGrp LOS C A A D A B B B
Approach Vol, veh/h 1112 1653 14 105
Approach Delay, s/veh 7.0 9.6 11.8 12.7
Approach LOS A A B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.1 20.9 11.0 5.1 19.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.2 2.1 6.9 3.9 2.5 11.0
Green Ext Time (p_c), s 0.0 0.0 4.7 0.5 0.0 4.9
Intersection Summary
HCM 7th Control Delay, s/veh 8.7
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 188 681 363 241 949 242 400 1384 195 248 1102 174 Future Volume (veh/h) 188 681 363 241 949 242 400 1384 195 248 1102 174 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 194 702 374 248 978 249 412 1427 201 256 1136 179 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 345 1450 444 278 1351 563 417 1701 655 325 1564 644 Arrive On Green 0.10 0.30 0.30 0.08 0.28 0.28 0.13 0.35 0.35 0.10 0.32 0.32 Sat Flow, veh/h 3291 4863 1490 3291 4863 1490 3291 4863 1508 3291 4863 1508 Grp Volume(v), veh/h 194 702 374 248 978 249 412 1427 201 256 1136 179 Grp Sat Flow(s),veh/h/ln 1646 1621 1490 1646 1621 1490 1646 1621 1508 1646 1621 1508 Q Serve(g_s), s 5.3 11.2 22.3 7.1 17.2 11.8 11.8 25.6 8.2 7.2 19.6 7.3 Cycle Q Clear(g_c), s 5.3 11.2 22.3 7.1 17.2 11.8 11.8 25.6 8.2 7.2 19.6 7.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 345 1450 444 278 1351 563 417 1701 655 325 1564 644 V/C Ratio(X) 0.56 0.48 0.84 0.89 0.72 0.44 0.99 0.84 0.31 0.79 0.73 0.28 Avail Cap(c_a), veh/h 348 1746 535 278 1643 652 417 1849 701 382 1797 716 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 40.3 27.3 31.1 42.9 30.9 22.1 41.3 28.3 17.5 41.7 28.4 17.7 Incr Delay (d2), s/veh 2.0 0.3 10.0 28.1 1.3 0.5 40.7 3.4 0.3 9.1 1.3 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 4.0 8.6 3.8 6.4 3.9 6.8 9.3 2.6 3.1 7.0 2.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 42.3 27.5 41.1 71.1 32.2 22.7 82.0 31.7 17.8 50.8 29.7 17.9 LnGrp LOS D C D E C C F C B D C B
Approach Vol, veh/h 1270 1475 2040 1571
Approach Delay, s/veh 33.8 37.1 40.5 31.8
Approach LOS C D D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.3 37.1 12.0 32.2 16.0 34.5 13.9 30.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 36.0 8.0 34.0 12.0 35.0 10.0 32.0 Max Q Clear Time (g_c+I1), s 9.2 27.6 9.1 24.3 13.8 21.6 7.3 19.2 Green Ext Time (p_c), s 0.2 5.6 0.0 4.0 0.0 6.3 0.1 5.6 Intersection Summary
HCM 7th Control Delay, s/veh 36.2
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Rosedale Highway & NW Promenade 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 149 1127 1358 134 167 106
Future Volume (veh/h) 149 1127 1358 134 167 106
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 154 1162 1400 138 172 109
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 359 3287 2239 694 586 269
Arrive On Green 0.10 0.63 0.43 0.43 0.17 0.17
Sat Flow, veh/h 3510 5358 5358 1608 3510 1610
Grp Volume(v), veh/h 154 1162 1400 138 172 109
Grp Sat Flow(s),veh/h/ln 1755 1729 1729 1608 1755 1610
Q Serve(g_s), s 1.7 4.2 8.4 2.1 1.7 2.4
Cycle Q Clear(g_c), s 1.7 4.2 8.4 2.1 1.7 2.4
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 359 3287 2239 694 586 269
V/C Ratio(X) 0.43 0.35 0.63 0.20 0.29 0.41
Avail Cap(c_a), veh/h 438 4009 2845 882 2713 1244
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 16.9 3.5 8.9 7.1 14.6 14.9
Incr Delay (d2), s/veh 0.8 0.1 0.3 0.1 0.3 1.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 0.2 1.7 0.0 0.6 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.7 3.5 9.2 7.2 14.9 15.9
LnGrp LOS B A A A B B
Approach Vol, veh/h 1316 1538 281
Approach Delay, s/veh 5.2 9.0 15.3
Approach LOS A A B
Timer - Assigned Phs 4 6 7 8
Phs Duration (G+Y+Rc), s 29.4 10.7 8.1 21.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 31.0 5.0 22.0
Max Q Clear Time (g_c+I1), s 6.2 4.4 3.7 10.4
Green Ext Time (p_c), s 8.0 0.9 0.1 6.9
Intersection Summary
HCM 7th Control Delay, s/veh 8.0
HCM 7th LOS A
" +++ 1 7 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 146 1017 19 56 1256 145 19 19 30 222 34 156 Future Volume (veh/h) 146 1017 19 56 1256 145 19 19 30 222 34 156 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 149 1038 19 57 1282 148 19 19 31 227 35 159 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 296 2108 654 97 1949 605 81 481 213 358 766 336 Arrive On Green 0.08 0.41 0.41 0.05 0.38 0.38 0.02 0.13 0.13 0.10 0.21 0.21 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1599 3510 3610 1581 Grp Volume(v), veh/h 149 1038 19 57 1282 148 19 19 31 227 35 159 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1599 1755 1805 1581 Q Serve(g_s), s 2.1 7.8 0.4 1.6 10.8 3.3 0.3 0.2 0.9 3.3 0.4 4.6 Cycle Q Clear(g_c), s 2.1 7.8 0.4 1.6 10.8 3.3 0.3 0.2 0.9 3.3 0.4 4.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 296 2108 654 97 1949 605 81 481 213 358 766 336 V/C Ratio(X) 0.50 0.49 0.03 0.59 0.66 0.24 0.23 0.04 0.15 0.63 0.05 0.47 Avail Cap(c_a), veh/h 401 2567 797 207 2567 797 334 2199 974 668 2543 1113 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 23.0 11.6 9.4 24.3 13.6 11.3 25.2 19.8 20.1 22.6 16.5 18.1 Incr Delay (d2), s/veh 1.3 0.2 0.0 5.5 0.4 0.2 1.5 0.0 0.3 1.9 0.0 1.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 2.1 0.1 0.7 3.1 0.9 0.1 0.1 0.3 1.3 0.1 1.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 24.3 11.8 9.4 29.8 14.0 11.5 26.7 19.9 20.4 24.5 16.5 19.2 LnGrp LOS C B A C B B C B C C B B
Approach Vol, veh/h 1206 1487 69 421
Approach Delay, s/veh 13.3 14.3 22.0 21.8
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.4 11.0 6.8 25.3 5.2 15.1 8.4 23.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 32.0 6.0 26.0 5.0 37.0 6.0 26.0 Max Q Clear Time (g_c+I1), s 5.3 2.9 3.6 9.8 2.3 6.6 4.1 12.8 Green Ext Time (p_c), s 0.3 0.1 0.0 6.0 0.0 0.7 0.1 7.0 Intersection Summary
HCM 7th Control Delay, s/veh 15.1
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 243 910 361 235 603 145 320 1089 350 141 911 212 Future Volume (veh/h) 243 910 361 235 603 145 320 1089 350 141 911 212 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 245 919 365 237 609 146 323 1100 354 142 920 214 Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 227 1492 462 265 1548 480 341 1814 563 211 1129 497 Arrive On Green 0.07 0.30 0.30 0.08 0.32 0.32 0.10 0.37 0.37 0.06 0.33 0.33 Sat Flow, veh/h 3319 4904 1519 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 245 919 365 237 609 146 323 1100 354 142 920 214 Grp Sat Flow(s),veh/h/ln 1659 1635 1519 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 6.0 14.1 19.3 6.2 8.5 6.4 8.5 16.0 16.8 3.7 21.7 9.8 Cycle Q Clear(g_c), s 6.0 14.1 19.3 6.2 8.5 6.4 8.5 16.0 16.8 3.7 21.7 9.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 227 1492 462 265 1548 480 341 1814 563 211 1129 497 V/C Ratio(X) 1.08 0.62 0.79 0.89 0.39 0.30 0.95 0.61 0.63 0.67 0.81 0.43 Avail Cap(c_a), veh/h 227 1790 554 265 1846 572 341 2069 642 303 1401 617 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 40.8 26.1 27.9 40.0 23.4 22.7 39.1 22.4 22.7 40.2 26.9 22.9 Incr Delay (d2), s/veh 82.2 0.5 6.4 29.6 0.2 0.4 35.3 0.4 1.6 3.7 3.1 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.9 5.0 7.1 3.5 3.0 2.1 4.9 5.5 5.6 1.5 8.4 3.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 123.1 26.6 34.3 69.6 23.6 23.1 74.4 22.8 24.3 43.9 30.0 23.5 LnGrp LOS F C C E C C E C C D C C
Approach Vol, veh/h 1529 992 1777 1276
Approach Delay, s/veh 43.9 34.5 32.5 30.5
Approach LOS D C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.6 36.4 11.0 30.7 13.0 33.0 10.0 31.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 37.0 7.0 32.0 9.0 36.0 6.0 33.0 Max Q Clear Time (g_c+I1), s 5.7 18.0 8.2 21.3 10.5 23.7 8.0 10.5 Green Ext Time (p_c), s 0.1 5.3 0.0 5.1 0.0 5.2 0.0 4.2 Intersection Summary
HCM 7th Control Delay, s/veh 35.5
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 111 745 20 21 1007 278 47 38 28 179 46 114 Future Volume (veh/h) 111 745 20 21 1007 278 47 38 28 179 46 114 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 116 776 21 22 1049 290 49 40 29 186 48 119 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 149 2114 653 47 1268 562 87 272 229 237 429 362 Arrive On Green 0.08 0.41 0.41 0.03 0.35 0.35 0.05 0.14 0.14 0.13 0.23 0.23 Sat Flow, veh/h 1810 5187 1602 1810 3610 1601 1810 1900 1600 1810 1900 1604 Grp Volume(v), veh/h 116 776 21 22 1049 290 49 40 29 186 48 119 Grp Sat Flow(s),veh/h/ln 1810 1729 1602 1810 1805 1601 1810 1900 1600 1810 1900 1604 Q Serve(g_s), s 3.4 5.7 0.4 0.7 14.5 7.8 1.4 1.0 0.9 5.4 1.1 3.4 Cycle Q Clear(g_c), s 3.4 5.7 0.4 0.7 14.5 7.8 1.4 1.0 0.9 5.4 1.1 3.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 149 2114 653 47 1268 562 87 272 229 237 429 362 V/C Ratio(X) 0.78 0.37 0.03 0.47 0.83 0.52 0.56 0.15 0.13 0.79 0.11 0.33 Avail Cap(c_a), veh/h 165 2114 653 165 1453 644 165 904 761 364 1112 939 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.6 11.3 9.7 26.3 16.2 14.1 25.5 20.5 20.4 23.0 16.8 17.7 Incr Delay (d2), s/veh 18.9 0.1 0.0 7.1 3.7 0.7 5.6 0.2 0.2 6.1 0.1 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.0 1.6 0.1 0.3 5.1 2.2 0.7 0.4 0.3 2.5 0.4 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 43.5 11.4 9.7 33.3 19.9 14.8 31.1 20.8 20.7 29.1 16.9 18.2 LnGrp LOS D B A C B B C C C C B B
Approach Vol, veh/h 913 1361 118 353
Approach Delay, s/veh 15.4 19.0 25.0 23.8
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.2 11.8 5.4 26.3 6.6 16.3 8.5 23.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 26.0 5.0 22.0 5.0 32.0 5.0 22.0 Max Q Clear Time (g_c+I1), s 7.4 3.0 2.7 7.7 3.4 5.4 5.4 16.5 Green Ext Time (p_c), s 0.2 0.2 0.0 4.1 0.0 0.6 0.0 2.7 Intersection Summary
HCM 7th Control Delay, s/veh 18.7
HCM 7th LOS B
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 18 778 76 142 736 13 101 31 138 39 17 3 Future Volume (veh/h) 18 778 76 142 736 13 101 31 138 39 17 3 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 19 810 79 148 767 14 105 32 144 41 18 3 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 42 1123 485 189 1416 627 144 373 315 80 305 254 Arrive On Green 0.02 0.31 0.31 0.10 0.39 0.39 0.08 0.20 0.20 0.04 0.16 0.16 Sat Flow, veh/h 1810 3610 1559 1810 3610 1598 1810 1900 1605 1810 1900 1583 Grp Volume(v), veh/h 19 810 79 148 767 14 105 32 144 41 18 3 Grp Sat Flow(s),veh/h/ln 1810 1805 1559 1810 1805 1598 1810 1900 1605 1810 1900 1583 Q Serve(g_s), s 0.5 9.3 1.7 3.7 7.6 0.2 2.6 0.6 3.7 1.0 0.4 0.1 Cycle Q Clear(g_c), s 0.5 9.3 1.7 3.7 7.6 0.2 2.6 0.6 3.7 1.0 0.4 0.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 42 1123 485 189 1416 627 144 373 315 80 305 254 V/C Ratio(X) 0.45 0.72 0.16 0.78 0.54 0.02 0.73 0.09 0.46 0.51 0.06 0.01 Avail Cap(c_a), veh/h 195 1475 637 195 1475 653 195 1021 863 195 1021 851 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.4 14.2 11.6 20.3 10.9 8.7 20.9 15.3 16.5 21.7 16.5 16.4 Incr Delay (d2), s/veh 7.3 1.2 0.2 18.0 0.4 0.0 8.6 0.1 1.0 5.0 0.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.9 0.4 2.2 2.0 0.1 1.3 0.2 1.1 0.5 0.1 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.7 15.4 11.8 38.3 11.3 8.7 29.5 15.4 17.5 26.7 16.6 16.4 LnGrp LOS C B B D B A C B B C B B
Approach Vol, veh/h 908 929 281 62
Approach Delay, s/veh 15.4 15.5 21.8 23.3
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.1 13.1 8.9 18.5 7.7 11.5 5.1 22.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 25.0 5.0 19.0 5.0 25.0 5.0 19.0 Max Q Clear Time (g_c+I1), s 3.0 5.7 5.7 11.3 4.6 2.4 2.5 9.6 Green Ext Time (p_c), s 0.0 0.5 0.0 2.8 0.0 0.0 0.0 3.1 Intersection Summary
HCM 7th Control Delay, s/veh 16.5
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 215 2 637 489 505 495 317 1298 15 4 1625 237 Future Volume (veh/h) 215 2 637 489 505 495 317 1298 15 4 1625 237 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 223 0 657 342 748 510 327 1338 15 4 1675 244 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 516 0 458 445 935 792 334 2236 25 9 1726 535 Arrive On Green 0.15 0.00 0.15 0.25 0.25 0.25 0.10 0.44 0.44 0.01 0.34 0.34 Sat Flow, veh/h 3506 0 3114 1753 3681 3116 3401 5123 57 1753 5025 1559 Grp Volume(v), veh/h 223 0 657 342 748 510 327 875 478 4 1675 244 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1830 1753 1675 1559 Q Serve(g_s), s 5.9 0.0 15.0 18.4 19.4 14.9 9.8 20.3 20.3 0.2 33.4 12.4 Cycle Q Clear(g_c), s 5.9 0.0 15.0 18.4 19.4 14.9 9.8 20.3 20.3 0.2 33.4 12.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.03 1.00 1.00
Lane Grp Cap(c), veh/h 516 0 458 445 935 792 334 1462 799 9 1726 535 V/C Ratio(X) 0.43 0.00 1.43 0.77 0.80 0.64 0.98 0.60 0.60 0.43 0.97 0.46 Avail Cap(c_a), veh/h 516 0 458 499 1048 887 334 1462 799 86 1726 535 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 39.6 0.0 43.4 35.2 35.6 33.9 45.8 21.9 21.9 50.5 32.9 26.0 Incr Delay (d2), s/veh 0.6 0.0 207.2 6.4 4.1 1.4 43.6 0.7 1.2 29.1 15.2 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.5 0.0 18.7 8.2 8.7 5.4 5.9 7.2 8.0 0.2 14.6 4.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 40.1 0.0 250.7 41.6 39.6 35.3 89.5 22.6 23.1 79.6 48.1 26.6 LnGrp LOS D F D D D F C C E D C
Approach Vol, veh/h 880 1600 1680 1923
Approach Delay, s/veh 197.3 38.7 35.8 45.5
Approach LOS F D D D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.5 48.5 19.0 14.0 39.0 29.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 40.0 15.0 10.0 35.0 29.0 Max Q Clear Time (g_c+I1), s 2.2 22.3 17.0 11.8 35.4 21.4 Green Ext Time (p_c), s 0.0 7.6 0.0 0.0 0.0 4.5
Intersection Summary
HCM 7th Control Delay, s/veh 63.0
HCM 7th LOS E
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 552 57 58 860 50 38
Future Volume (veh/h) 552 57 58 860 50 38
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 594 61 62 925 54 41
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1149 118 125 2046 129 98
Arrive On Green 0.35 0.35 0.07 0.57 0.13 0.13
Sat Flow, veh/h 3399 339 1810 3705 967 734
Grp Volume(v), veh/h 324 331 62 925 96 0
Grp Sat Flow(s),veh/h/ln 1805 1837 1810 1805 1719 0
Q Serve(g_s), s 3.8 3.8 0.9 4.0 1.4 0.0
Cycle Q Clear(g_c), s 3.8 3.8 0.9 4.0 1.4 0.0
Prop In Lane 0.18 1.00 0.56 0.43
Lane Grp Cap(c), veh/h 628 639 125 2046 230 0
V/C Ratio(X) 0.52 0.52 0.50 0.45 0.42 0.00
Avail Cap(c_a), veh/h 1690 1721 678 5274 837 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 6.9 6.9 12.0 3.4 10.6 0.0
Incr Delay (d2), s/veh 0.7 0.7 3.0 0.2 1.2 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 0.5 0.3 0.0 0.4 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 7.6 7.6 15.0 3.5 11.8 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 655 987 96
Approach Delay, s/veh 7.6 4.2 11.8
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 7.6 5.8 13.3 19.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 13.0 10.0 25.0 39.0
Max Q Clear Time (g_c+I1), s 3.4 2.9 5.8 6.0
Green Ext Time (p_c), s 0.1 0.1 3.3 6.6
Intersection Summary
HCM 7th Control Delay, s/veh 5.9
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 173 227 165 156 344 282 219 1339 109 205 1247 143 Future Volume (veh/h) 173 227 165 156 344 282 219 1339 109 205 1247 143 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 180 236 172 162 358 294 228 1395 114 214 1299 149 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 273 939 724 249 914 406 323 1783 546 344 1814 562 Arrive On Green 0.08 0.26 0.26 0.07 0.25 0.25 0.09 0.34 0.34 0.10 0.35 0.35 Sat Flow, veh/h 3510 3610 2785 3510 3610 1603 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 180 236 172 162 358 294 228 1395 114 214 1299 149 Grp Sat Flow(s),veh/h/ln 1755 1805 1392 1755 1805 1603 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 3.5 3.6 3.4 3.2 5.8 11.8 4.4 17.0 3.6 4.1 15.3 4.7 Cycle Q Clear(g_c), s 3.5 3.6 3.4 3.2 5.8 11.8 4.4 17.0 3.6 4.1 15.3 4.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 273 939 724 249 914 406 323 1783 546 344 1814 562 V/C Ratio(X) 0.66 0.25 0.24 0.65 0.39 0.72 0.71 0.78 0.21 0.62 0.72 0.27 Avail Cap(c_a), veh/h 399 1744 1345 299 1641 729 399 1990 609 349 1916 594 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.6 20.6 20.5 31.9 21.8 24.0 31.0 20.7 16.3 30.5 19.9 16.4 Incr Delay (d2), s/veh 2.7 0.1 0.2 3.7 0.3 2.5 4.2 1.9 0.2 3.3 1.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 1.4 1.0 1.3 2.2 4.2 1.9 6.1 1.1 1.7 5.4 1.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 34.3 20.8 20.7 35.6 22.1 26.5 35.3 22.6 16.5 33.8 21.1 16.6 LnGrp LOS C C C D C C D C B C C B
Approach Vol, veh/h 588 814 1737 1662
Approach Delay, s/veh 24.9 26.4 23.9 22.3
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.9 28.2 9.0 22.3 10.5 28.6 9.5 21.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 27.0 6.0 34.0 8.0 26.0 8.0 32.0 Max Q Clear Time (g_c+I1), s 6.1 19.0 5.2 5.6 6.4 17.3 5.5 13.8 Green Ext Time (p_c), s 0.1 5.2 0.0 2.0 0.1 5.3 0.1 2.8 Intersection Summary
HCM 7th Control Delay, s/veh 23.9
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 476 27 54 656 20 35 3 70 4 4 11 Future Volume (veh/h) 10 476 27 54 656 20 35 3 70 4 4 11 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 11 523 30 59 721 22 38 3 77 4 4 12 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 36 950 409 146 1157 35 260 21 248 52 52 156
Arrive On Green 0.02 0.26 0.26 0.08 0.32 0.32 0.15 0.15 0.15 0.15 0.15 0.15 Sat Flow, veh/h 1810 3610 1553 1810 3572 109 1683 133 1607 339 339 1018 Grp Volume(v), veh/h 11 523 30 59 364 379 41 0 77 20 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1553 1810 1805 1876 1816 0 1607 1697 0 0 Q Serve(g_s), s 0.3 5.7 0.7 1.4 7.8 7.8 0.9 0.0 2.0 0.5 0.0 0.0 Cycle Q Clear(g_c), s 0.3 5.7 0.7 1.4 7.8 7.8 0.9 0.0 2.0 0.5 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.06 0.93 1.00 0.20 0.60
Lane Grp Cap(c), veh/h 36 950 409 146 584 608 280 0 248 259 0 0 V/C Ratio(X) 0.30 0.55 0.07 0.40 0.62 0.62 0.15 0.00 0.31 0.08 0.00 0.00 Avail Cap(c_a), veh/h 276 2205 949 276 1103 1146 872 0 771 259 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 22.1 14.6 12.7 20.0 13.1 13.1 16.8 0.0 17.2 16.6 0.0 0.0 Incr Delay (d2), s/veh 4.6 0.5 0.1 1.8 1.1 1.1 0.2 0.0 0.7 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 1.8 0.2 0.6 2.4 2.5 0.3 0.0 0.6 0.2 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 26.8 15.1 12.8 21.8 14.2 14.2 17.0 0.0 17.9 16.8 0.0 0.0 LnGrp LOS C B B C B B B B B
Approach Vol, veh/h 564 802 118 20
Approach Delay, s/veh 15.2 14.8 17.6 16.8
Approach LOS B B B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.1 7.7 16.1 11.0 4.9 18.8
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 22.0 7.0 28.0 7.0 7.0 28.0
Max Q Clear Time (g_c+I1), s 4.0 3.4 7.7 2.5 2.3 9.8
Green Ext Time (p_c), s 0.3 0.0 3.0 0.0 0.0 3.8
Intersection Summary
HCM 7th Control Delay, s/veh 15.2
HCM 7th LOS B
h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 24 248 159 225 291 79 157 173 180 46 98 13 Future Volume (veh/h) 24 248 159 225 291 79 157 173 180 46 98 13 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.93 1.00 0.92 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 25 258 166 234 303 82 164 180 188 48 102 14 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 70 550 246 333 753 336 257 866 681 111 716 98 Arrive On Green 0.04 0.15 0.15 0.09 0.21 0.21 0.07 0.46 0.46 0.06 0.44 0.44 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1495 1810 1614 222 Grp Volume(v), veh/h 25 258 166 234 303 82 164 180 188 48 0 116 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1495 1810 0 1836 Q Serve(g_s), s 0.9 4.4 6.6 4.4 4.9 2.9 3.1 3.9 5.3 1.7 0.0 2.5 Cycle Q Clear(g_c), s 0.9 4.4 6.6 4.4 4.9 2.9 3.1 3.9 5.3 1.7 0.0 2.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.12
Lane Grp Cap(c), veh/h 70 550 246 333 753 336 257 866 681 111 0 815 V/C Ratio(X) 0.36 0.47 0.68 0.70 0.40 0.24 0.64 0.21 0.28 0.43 0.00 0.14 Avail Cap(c_a), veh/h 187 1330 593 414 1383 617 414 952 749 187 0 893 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 31.8 26.2 27.2 29.8 23.2 22.4 30.6 11.1 11.5 30.7 0.0 11.2 Incr Delay (d2), s/veh 3.0 0.6 3.2 4.0 0.3 0.4 2.6 0.1 0.2 2.6 0.0 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 1.7 2.5 1.8 1.9 1.0 1.3 1.4 1.4 0.8 0.0 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 34.8 26.9 30.4 33.8 23.6 22.8 33.2 11.2 11.7 33.3 0.0 11.3 LnGrp LOS C C C C C C C B B C B
Approach Vol, veh/h 449 619 532 164
Approach Delay, s/veh 28.6 27.3 18.2 17.7
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.2 34.9 10.4 14.3 9.0 34.1 6.6 18.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 34.0 8.0 25.0 8.0 33.0 7.0 26.0 Max Q Clear Time (g_c+I1), s 3.7 7.3 6.4 8.6 5.1 4.5 2.9 6.9 Green Ext Time (p_c), s 0.0 1.6 0.1 1.7 0.1 0.5 0.0 1.8 Intersection Summary
HCM 7th Control Delay, s/veh 24.0
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 41 330 44 48 321 92 37 33 44 111 31 52 Future Volume (veh/h) 41 330 44 48 321 92 37 33 44 111 31 52 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 42 340 45 49 331 95 38 34 45 114 32 54 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 86 743 329 97 765 339 153 405 342 328 500 417 Arrive On Green 0.05 0.21 0.21 0.05 0.21 0.21 0.04 0.21 0.21 0.09 0.26 0.26 Sat Flow, veh/h 1810 3610 1598 1810 3610 1599 3510 1900 1603 3510 1900 1584 Grp Volume(v), veh/h 42 340 45 49 331 95 38 34 45 114 32 54 Grp Sat Flow(s),veh/h/ln 1810 1805 1598 1810 1805 1599 1755 1900 1603 1755 1900 1584 Q Serve(g_s), s 0.8 3.0 0.8 1.0 2.9 1.8 0.4 0.5 0.8 1.1 0.5 1.0 Cycle Q Clear(g_c), s 0.8 3.0 0.8 1.0 2.9 1.8 0.4 0.5 0.8 1.1 0.5 1.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 86 743 329 97 765 339 153 405 342 328 500 417 V/C Ratio(X) 0.49 0.46 0.14 0.51 0.43 0.28 0.25 0.08 0.13 0.35 0.06 0.13 Avail Cap(c_a), veh/h 294 2546 1127 294 2546 1127 476 1855 1566 571 1907 1590 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.1 12.8 12.0 17.0 12.6 12.2 17.0 11.6 11.7 15.7 10.2 10.4 Incr Delay (d2), s/veh 4.3 0.4 0.2 4.0 0.4 0.4 0.8 0.1 0.2 0.6 0.1 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.9 0.2 0.4 0.8 0.5 0.1 0.2 0.2 0.4 0.1 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.4 13.3 12.2 21.0 13.0 12.6 17.9 11.7 11.9 16.3 10.2 10.5 LnGrp LOS C B B C B B B B B B B B
Approach Vol, veh/h 427 475 117 200
Approach Delay, s/veh 14.0 13.7 13.8 13.8
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.4 11.9 6.0 11.6 5.6 13.7 5.7 11.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 36.0 6.0 26.0 5.0 37.0 6.0 26.0 Max Q Clear Time (g_c+I1), s 3.1 2.8 3.0 5.0 2.4 3.0 2.8 4.9 Green Ext Time (p_c), s 0.1 0.3 0.0 2.0 0.0 0.3 0.0 2.1 Intersection Summary
HCM 7th Control Delay, s/veh 13.8
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 39 134 203 95 223 142 439 1284 150 149 1025 63 Future Volume (veh/h) 39 134 203 95 223 142 439 1284 150 149 1025 63 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 40 137 207 97 228 145 448 1310 153 152 1046 64 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 143 663 295 237 1091 333 568 2075 635 273 1638 502 Arrive On Green 0.04 0.18 0.18 0.07 0.21 0.21 0.16 0.40 0.40 0.08 0.32 0.32 Sat Flow, veh/h 3510 3610 1608 3510 5187 1585 3510 5187 1589 3510 5187 1588 Grp Volume(v), veh/h 40 137 207 97 228 145 448 1310 153 152 1046 64 Grp Sat Flow(s),veh/h/ln 1755 1805 1608 1755 1729 1585 1755 1729 1589 1755 1729 1588 Q Serve(g_s), s 0.7 1.9 7.1 1.6 2.1 4.7 7.2 12.0 3.8 2.5 10.2 1.7 Cycle Q Clear(g_c), s 0.7 1.9 7.1 1.6 2.1 4.7 7.2 12.0 3.8 2.5 10.2 1.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 143 663 295 237 1091 333 568 2075 635 273 1638 502 V/C Ratio(X) 0.28 0.21 0.70 0.41 0.21 0.43 0.79 0.63 0.24 0.56 0.64 0.13 Avail Cap(c_a), veh/h 298 2019 899 357 2990 914 655 3078 943 298 2550 781 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.5 20.4 22.6 26.4 19.2 20.2 23.8 14.2 11.8 26.2 17.3 14.4 Incr Delay (d2), s/veh 1.1 0.2 3.0 1.1 0.1 0.9 5.6 0.3 0.2 1.9 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.7 2.5 0.6 0.7 1.5 3.0 3.6 1.1 1.0 3.3 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 28.5 20.6 25.6 27.5 19.3 21.1 29.4 14.5 11.9 28.1 17.7 14.5 LnGrp LOS C C C C B C C B B C B B
Approach Vol, veh/h 384 470 1911 1262
Approach Delay, s/veh 24.1 21.6 17.8 18.8
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.6 27.6 8.0 14.8 13.5 22.6 6.4 16.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 6.0 33.0 11.0 29.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 4.5 14.0 3.6 9.1 9.2 12.2 2.7 6.7 Green Ext Time (p_c), s 0.0 9.3 0.0 1.4 0.3 6.3 0.0 1.8 Intersection Summary
HCM 7th Control Delay, s/veh 19.2
HCM 7th LOS B
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 43 463 136 174 825 44 231 648 165 69 616 85 Future Volume (veh/h) 43 463 136 174 825 44 231 648 165 69 616 85 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 45 487 143 183 868 46 243 682 174 73 648 89 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 154 1088 484 288 1184 63 350 1060 470 205 1310 403 Arrive On Green 0.04 0.30 0.30 0.08 0.34 0.34 0.10 0.29 0.29 0.06 0.25 0.25 Sat Flow, veh/h 3510 3610 1607 3510 3487 185 3510 3610 1599 3510 5187 1597 Grp Volume(v), veh/h 45 487 143 183 449 465 243 682 174 73 648 89 Grp Sat Flow(s),veh/h/ln 1755 1805 1607 1755 1805 1866 1755 1805 1599 1755 1729 1597 Q Serve(g_s), s 0.8 6.6 4.1 3.1 13.2 13.2 4.1 10.0 5.2 1.2 6.5 2.7 Cycle Q Clear(g_c), s 0.8 6.6 4.1 3.1 13.2 13.2 4.1 10.0 5.2 1.2 6.5 2.7 Prop In Lane 1.00 1.00 1.00 0.10 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 154 1088 484 288 613 634 350 1060 470 205 1310 403 V/C Ratio(X) 0.29 0.45 0.30 0.64 0.73 0.73 0.70 0.64 0.37 0.36 0.49 0.22 Avail Cap(c_a), veh/h 290 1670 744 464 925 956 406 1969 872 290 2657 818 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.0 17.1 16.2 26.9 17.6 17.6 26.4 18.6 16.9 27.4 19.3 17.9 Incr Delay (d2), s/veh 1.0 0.3 0.3 2.3 1.7 1.7 4.2 0.7 0.5 1.0 0.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.4 1.4 1.3 4.9 5.1 1.7 3.4 1.7 0.5 2.1 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.1 17.4 16.5 29.2 19.3 19.2 30.6 19.3 17.4 28.4 19.6 18.2 LnGrp LOS C B B C B B C B B C B B
Approach Vol, veh/h 675 1097 1099 810
Approach Delay, s/veh 18.0 20.9 21.5 20.2
Approach LOS B C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.5 21.8 9.0 22.2 10.0 19.3 6.7 24.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 33.0 8.0 28.0 7.0 31.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 3.2 12.0 5.1 8.6 6.1 8.5 2.8 15.2 Green Ext Time (p_c), s 0.0 4.5 0.1 3.4 0.1 4.1 0.0 4.9 Intersection Summary
HCM 7th Control Delay, s/veh 20.4
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 120 483 127 171 678 85 329 887 192 145 732 112 Future Volume (veh/h) 120 483 127 171 678 85 329 887 192 145 732 112 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 125 503 132 178 706 89 343 924 200 151 762 117 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 252 1468 448 273 1500 452 453 1574 488 264 1295 401 Arrive On Green 0.07 0.28 0.28 0.08 0.29 0.29 0.13 0.30 0.30 0.08 0.25 0.25 Sat Flow, veh/h 3510 5187 1583 3510 5187 1562 3510 5187 1609 3510 5187 1608 Grp Volume(v), veh/h 125 503 132 178 706 89 343 924 200 151 762 117 Grp Sat Flow(s),veh/h/ln 1755 1729 1583 1755 1729 1562 1755 1729 1609 1755 1729 1608 Q Serve(g_s), s 2.1 4.7 4.0 3.0 6.9 2.6 5.8 9.3 6.1 2.6 7.9 3.6 Cycle Q Clear(g_c), s 2.1 4.7 4.0 3.0 6.9 2.6 5.8 9.3 6.1 2.6 7.9 3.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 252 1468 448 273 1500 452 453 1574 488 264 1295 401 V/C Ratio(X) 0.50 0.34 0.29 0.65 0.47 0.20 0.76 0.59 0.41 0.57 0.59 0.29 Avail Cap(c_a), veh/h 286 2618 799 286 2618 788 514 2956 917 457 2871 890 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.4 17.5 17.2 27.5 18.0 16.5 25.8 18.1 17.0 27.4 20.3 18.7 Incr Delay (d2), s/veh 1.5 0.1 0.4 4.9 0.2 0.2 5.6 0.4 0.6 1.9 0.4 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 1.6 1.3 1.3 2.3 0.8 2.4 3.0 1.9 1.0 2.7 1.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 28.9 17.6 17.6 32.4 18.2 16.7 31.4 18.5 17.6 29.4 20.7 19.0 LnGrp LOS C B B C B B C B B C C B
Approach Vol, veh/h 760 973 1467 1030
Approach Delay, s/veh 19.5 20.7 21.4 21.8
Approach LOS B C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.6 22.6 8.8 21.4 11.9 19.3 8.4 21.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 35.0 5.0 31.0 9.0 34.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 4.6 11.3 5.0 6.7 7.8 9.9 4.1 8.9 Green Ext Time (p_c), s 0.1 6.6 0.0 3.6 0.2 5.1 0.0 4.6 Intersection Summary
HCM 7th Control Delay, s/veh 21.0
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/21/2025 Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 67 67 188 239 125 78 218 1171 179 24 993 29 Future Volume (veh/h) 67 67 188 239 125 78 218 1171 179 24 993 29 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 69 69 194 246 129 80 225 1207 185 25 1024 30 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 100 343 283 294 547 454 272 1723 264 51 1337 413 Arrive On Green 0.06 0.18 0.18 0.16 0.29 0.29 0.15 0.38 0.38 0.03 0.26 0.26 Sat Flow, veh/h 1810 1900 1571 1810 1900 1578 1810 4536 695 1810 5187 1604 Grp Volume(v), veh/h 69 69 194 246 129 80 225 920 472 25 1024 30 Grp Sat Flow(s),veh/h/ln 1810 1900 1571 1810 1900 1578 1810 1729 1773 1810 1729 1604 Q Serve(g_s), s 2.4 2.0 7.4 8.5 3.3 2.4 7.7 14.4 14.4 0.9 11.7 0.9 Cycle Q Clear(g_c), s 2.4 2.0 7.4 8.5 3.3 2.4 7.7 14.4 14.4 0.9 11.7 0.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.39 1.00 1.00
Lane Grp Cap(c), veh/h 100 343 283 294 547 454 272 1314 673 51 1337 413 V/C Ratio(X) 0.69 0.20 0.69 0.84 0.24 0.18 0.83 0.70 0.70 0.49 0.77 0.07 Avail Cap(c_a), veh/h 225 651 538 338 769 639 310 1346 690 141 1535 475 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.8 22.4 24.6 26.1 17.5 17.2 26.5 16.8 16.8 30.8 22.0 18.0 Incr Delay (d2), s/veh 8.3 0.3 2.9 14.9 0.2 0.2 15.1 1.6 3.1 7.2 2.1 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 0.8 2.7 4.4 1.3 0.8 4.0 4.7 5.1 0.4 4.2 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 38.1 22.7 27.5 40.9 17.7 17.3 41.6 18.4 19.9 38.0 24.1 18.1 LnGrp LOS D C C D B B D B B D C B
Approach Vol, veh/h 332 455 1617 1079
Approach Delay, s/veh 28.7 30.2 22.1 24.3
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 5.8 28.4 14.4 15.6 13.6 20.5 7.5 22.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 25.0 12.0 22.0 11.0 19.0 8.0 26.0 Max Q Clear Time (g_c+I1), s 2.9 16.4 10.5 9.4 9.7 13.7 4.4 5.3 Green Ext Time (p_c), s 0.0 5.0 0.1 0.7 0.1 2.8 0.0 0.8 Intersection Summary
HCM 7th Control Delay, s/veh 24.4
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 47 20 81 125 34 100 81 1418 90 79 1333 41 Future Volume (veh/h) 47 20 81 125 34 100 81 1418 90 79 1333 41 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 48 21 84 129 35 103 84 1462 93 81 1374 42 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 90 48 193 304 346 290 128 1862 576 126 1855 561 Arrive On Green 0.05 0.15 0.15 0.09 0.18 0.18 0.07 0.36 0.36 0.07 0.36 0.36 Sat Flow, veh/h 1810 332 1329 3510 1900 1589 1810 5187 1603 1810 5187 1570 Grp Volume(v), veh/h 48 0 105 129 35 103 84 1462 93 81 1374 42 Grp Sat Flow(s),veh/h/ln 1810 0 1661 1755 1900 1589 1810 1729 1603 1810 1729 1570 Q Serve(g_s), s 1.2 0.0 2.7 1.6 0.7 2.7 2.1 11.8 1.9 2.1 10.9 0.8 Cycle Q Clear(g_c), s 1.2 0.0 2.7 1.6 0.7 2.7 2.1 11.8 1.9 2.1 10.9 0.8 Prop In Lane 1.00 0.80 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 90 0 241 304 346 290 128 1862 576 126 1855 561 V/C Ratio(X) 0.54 0.00 0.44 0.42 0.10 0.36 0.66 0.79 0.16 0.65 0.74 0.07 Avail Cap(c_a), veh/h 192 0 917 373 1049 877 192 1982 613 192 1982 600 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.9 0.0 18.4 20.4 16.0 16.8 21.3 13.5 10.3 21.4 13.2 10.0 Incr Delay (d2), s/veh 4.9 0.0 1.2 0.9 0.1 0.7 5.6 2.0 0.1 5.4 1.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 0.9 0.6 0.3 0.8 0.9 3.3 0.5 0.9 3.0 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 26.8 0.0 19.6 21.3 16.2 17.6 26.9 15.5 10.4 26.8 14.6 10.0 LnGrp LOS C B C B B C B B C B B
Approach Vol, veh/h 153 267 1639 1497
Approach Delay, s/veh 21.8 19.2 15.8 15.2
Approach LOS C B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.3 20.9 8.1 10.8 7.3 20.8 6.3 12.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 18.0 5.0 26.0 5.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 4.1 13.8 3.6 4.7 4.1 12.9 3.2 4.7 Green Ext Time (p_c), s 0.0 3.0 0.0 0.5 0.0 3.4 0.0 0.4 Intersection Summary
HCM 7th Control Delay, s/veh 16.0
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 253 0 155 0 0 0 296 1419 0 0 1309 249 Future Volume (veh/h) 253 0 155 0 0 0 296 1419 0 0 1309 249 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 258 0 158 0 0 0 302 1448 0 0 1336 254 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 901 0 268 0 316 0 369 3412 0 0 1897 589
Arrive On Green 0.17 0.00 0.17 0.00 0.00 0.00 0.20 0.66 0.00 0.00 0.37 0.37 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 258 0 158 0 0 0 302 1448 0 0 1336 254 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 3.0 0.0 4.1 0.0 0.0 0.0 7.3 6.0 0.0 0.0 10.0 5.4 Cycle Q Clear(g_c), s 3.0 0.0 4.1 0.0 0.0 0.0 7.3 6.0 0.0 0.0 10.0 5.4 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 901 0 268 0 316 0 369 3412 0 0 1897 589 V/C Ratio(X) 0.29 0.00 0.59 0.00 0.00 0.00 0.82 0.42 0.00 0.00 0.70 0.43 Avail Cap(c_a), veh/h 2015 0 779 0 919 0 477 3991 0 0 2167 673 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 17.1 0.0 17.5 0.0 0.0 0.0 17.3 3.7 0.0 0.0 12.3 10.9 Incr Delay (d2), s/veh 0.2 0.0 2.1 0.0 0.0 0.0 8.4 0.1 0.0 0.0 0.9 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.0 1.3 0.0 0.0 0.0 3.1 0.2 0.0 0.0 2.6 1.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.2 0.0 19.6 0.0 0.0 0.0 25.7 3.8 0.0 0.0 13.2 11.4 LnGrp LOS B B C A B B
Approach Vol, veh/h 416 0 1750 1590
Approach Delay, s/veh 18.1 0.0 7.6 12.9
Approach LOS B A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 33.9 11.6 13.3 20.6 11.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 35.0 22.0 12.0 19.0 22.0
Max Q Clear Time (g_c+I1), s 8.0 6.1 9.3 12.0 0.0
Green Ext Time (p_c), s 10.6 1.5 0.2 4.6 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 11.0
HCM 7th LOS B
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Jet Way 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 88 75 1815 107 14 1753
Future Volume (veh/h) 88 75 1815 107 14 1753
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 95 81 1952 115 15 1885
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 183 163 2971 922 48 3587
Arrive On Green 0.10 0.10 0.57 0.57 0.03 0.69
Sat Flow, veh/h 1810 1610 5358 1610 1810 5358
Grp Volume(v), veh/h 95 81 1952 115 15 1885
Grp Sat Flow(s),veh/h/ln 1810 1610 1729 1610 1810 1729
Q Serve(g_s), s 2.2 2.1 11.2 1.4 0.4 7.7
Cycle Q Clear(g_c), s 2.2 2.1 11.2 1.4 0.4 7.7
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 183 163 2971 922 48 3587
V/C Ratio(X) 0.52 0.50 0.66 0.12 0.31 0.53
Avail Cap(c_a), veh/h 1041 926 3581 1112 291 4894
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 18.5 18.5 6.4 4.3 20.8 3.2
Incr Delay (d2), s/veh 2.3 2.3 0.3 0.1 3.6 0.1
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.9 0.8 1.3 0.3 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 20.8 20.8 6.7 4.3 24.3 3.4
LnGrp LOS C C A A C A
Approach Vol, veh/h 176 2067 1900
Approach Delay, s/veh 20.8 6.6 3.5
Approach LOS C A A
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 5.2 28.9 34.1 9.4
Change Period (Y+Rc), s 4.0 4.0 4.0 5.0
Max Green Setting (Gmax), s 7.0 30.0 41.0 25.0
Max Q Clear Time (g_c+I1), s 2.4 13.2 9.7 4.2
Green Ext Time (p_c), s 0.0 11.7 16.2 0.5
Intersection Summary
HCM 7th Control Delay, s/veh 5.8
HCM 7th LOS A
h 7 1 7 " 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 254 162 0 1842 1745 642
Future Volume (veh/h) 254 162 0 1842 1745 642
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 281 141 0 1880 1781 0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 611 272 0 3301 3301
Arrive On Green 0.17 0.17 0.00 0.64 0.64 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 281 141 0 1880 1781 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 2.9 3.3 0.0 8.5 7.8 0.0
Cycle Q Clear(g_c), s 2.9 3.3 0.0 8.5 7.8 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 611 272 0 3301 3301
V/C Ratio(X) 0.46 0.52 0.00 0.57 0.54
Avail Cap(c_a), veh/h 1057 470 0 5049 5049
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 15.4 15.6 0.0 4.3 4.1 0.0
Incr Delay (d2), s/veh 0.5 1.5 0.0 0.2 0.1 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.1 1.1 0.0 0.2 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 15.9 17.1 0.0 4.4 4.3 0.0
LnGrp LOS B B A A
Approach Vol, veh/h 422 1880 1781
Approach Delay, s/veh 16.3 4.4 4.3
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 30.2 10.9 30.2
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 40.0 12.0 40.0
Max Q Clear Time (g_c+I1), s 10.5 5.3 9.8
Green Ext Time (p_c), s 15.7 0.9 14.7
Intersection Summary
HCM 7th Control Delay, s/veh 5.6
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 902 0 220 0 1623 398 188 1714 0 Future Volume (veh/h) 0 0 0 902 0 220 0 1623 398 188 1714 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 940 0 229 0 1691 415 196 1785 0 Peak Hour Factor 0.95 0.95 0.95 0.96 0.95 0.96 0.95 0.96 0.96 0.96 0.96 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 3 0 1108 0 986 0 2153 1153 288 2918 0
Arrive On Green 0.00 0.00 0.00 0.31 0.00 0.31 0.00 0.41 0.41 0.08 0.56 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 940 0 229 0 1691 415 196 1785 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 14.8 0.0 3.2 0.0 17.3 6.0 3.3 14.0 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 14.8 0.0 3.2 0.0 17.3 6.0 3.3 14.0 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 3 0 1108 0 986 0 2153 1153 288 2918 0 V/C Ratio(X) 0.00 0.00 0.00 0.85 0.00 0.23 0.00 0.79 0.36 0.68 0.61 0.00 Avail Cap(c_a), veh/h 0 153 0 1306 0 1637 0 2297 1197 288 3062 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 19.8 0.0 15.8 0.0 15.5 3.2 27.2 8.9 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 4.8 0.0 0.1 0.0 1.8 0.2 6.4 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 5.9 0.0 1.0 0.0 5.3 0.7 1.5 3.2 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 24.6 0.0 15.9 0.0 17.2 3.4 33.6 9.2 0.0 LnGrp LOS C B B A C A
Approach Vol, veh/h 0 1169 2106 1981
Approach Delay, s/veh 0.0 22.9 14.5 11.6
Approach LOS C B B
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 9.0 29.3 22.7 0.0 38.3 22.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 27.0 22.0 5.0 36.0 31.0 Max Q Clear Time (g_c+I1), s 5.3 19.3 16.8 0.0 16.0 5.2 Green Ext Time (p_c), s 0.0 6.1 1.8 0.0 11.7 0.8
Intersection Summary
HCM 7th Control Delay, s/veh 15.3
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/20/2025 Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 308 530 155 306 671 369 159 1151 215 308 1741 300 Future Volume (veh/h) 308 530 155 306 671 369 159 1151 215 308 1741 300 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 328 564 165 326 714 393 169 1224 229 328 1852 319 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 351 1436 440 403 1512 463 244 1473 276 395 1965 610 Arrive On Green 0.10 0.28 0.28 0.11 0.29 0.29 0.07 0.34 0.34 0.11 0.38 0.38 Sat Flow, veh/h 3510 5187 1590 3510 5187 1588 3510 4389 821 3510 5187 1610 Grp Volume(v), veh/h 328 564 165 326 714 393 169 964 489 328 1852 319 Grp Sat Flow(s),veh/h/ln 1755 1729 1590 1755 1729 1588 1755 1729 1752 1755 1729 1610 Q Serve(g_s), s 9.3 8.8 8.4 9.1 11.3 23.3 4.7 25.7 25.7 9.1 34.5 15.3 Cycle Q Clear(g_c), s 9.3 8.8 8.4 9.1 11.3 23.3 4.7 25.7 25.7 9.1 34.5 15.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.47 1.00 1.00
Lane Grp Cap(c), veh/h 351 1436 440 403 1512 463 244 1161 588 395 1965 610 V/C Ratio(X) 0.93 0.39 0.37 0.81 0.47 0.85 0.69 0.83 0.83 0.83 0.94 0.52 Avail Cap(c_a), veh/h 351 1506 461 527 1765 541 246 1161 588 422 1973 612 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 44.6 29.3 29.1 43.1 29.1 33.3 45.4 30.6 30.6 43.4 30.0 24.0 Incr Delay (d2), s/veh 31.4 0.2 0.5 7.0 0.2 10.8 8.0 5.2 9.8 12.5 9.9 0.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.4 3.5 3.1 4.2 4.5 9.8 2.2 10.5 11.4 4.4 14.5 5.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 76.0 29.5 29.7 50.2 29.3 44.1 53.5 35.8 40.4 55.9 39.8 24.8 LnGrp LOS E C C D C D D D D E D C
Approach Vol, veh/h 1057 1433 1622 2499
Approach Delay, s/veh 44.0 38.1 39.0 40.0
Approach LOS D D D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 15.2 37.5 15.5 31.7 10.9 41.8 14.0 33.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 12.0 33.0 15.0 29.0 7.0 38.0 10.0 34.0 Max Q Clear Time (g_c+I1), s 11.1 27.7 11.1 10.8 6.7 36.5 11.3 25.3 Green Ext Time (p_c), s 0.1 3.6 0.4 3.8 0.0 1.4 0.0 3.9 Intersection Summary
HCM 7th Control Delay, s/veh 40.0
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 143 0 151 0 0 0 203 1117 0 0 1003 145 Future Volume (veh/h) 143 0 151 0 0 0 203 1117 0 0 1003 145 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 151 0 159 0 0 0 214 1176 0 0 1056 153 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 535 0 0 0 5 0 434 3231 0 0 2008 615
Arrive On Green 0.15 0.00 0.00 0.00 0.00 0.00 0.12 0.62 0.00 0.00 0.39 0.39 Sat Flow, veh/h 3510 151 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 151 13.7 0 0 0 214 1176 0 0 1056 153 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 1.4 0.0 0.0 0.0 2.0 3.9 0.0 0.0 5.6 2.3 Cycle Q Clear(g_c), s 1.4 0.0 0.0 0.0 2.0 3.9 0.0 0.0 5.6 2.3 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 535 0 5 0 434 3231 0 0 2008 615
V/C Ratio(X) 0.28 0.00 0.00 0.00 0.49 0.36 0.00 0.00 0.53 0.25 Avail Cap(c_a), veh/h 2760 0 1547 0 493 4515 0 0 3204 981 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 13.4 0.0 0.0 0.0 14.6 3.3 0.0 0.0 8.4 7.4 Incr Delay (d2), s/veh 0.3 0.0 0.0 0.0 0.9 0.1 0.0 0.0 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 0.0 0.0 0.6 0.0 0.0 0.0 1.0 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.7 0.0 0.0 0.0 15.4 3.3 0.0 0.0 8.6 7.6 LnGrp LOS B B A A A
Approach Vol, veh/h 0 1390 1209
Approach Delay, s/veh 0.0 5.2 8.5
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 26.2 8.4 17.8 9.4 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 5.9 4.0 7.6 3.4 0.0
Green Ext Time (p_c), s 8.2 0.1 6.1 0.4 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.1
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 149 507 181 236 807 282 200 907 211 208 802 107 Future Volume (veh/h) 149 507 181 236 807 282 200 907 211 208 802 107 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 152 517 185 241 823 288 204 926 215 212 818 109 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 235 1447 440 290 1529 465 298 1462 447 477 1726 528 Arrive On Green 0.07 0.28 0.28 0.08 0.29 0.29 0.08 0.28 0.28 0.14 0.33 0.33 Sat Flow, veh/h 3510 5187 1576 3510 5187 1578 3510 5187 1586 3510 5187 1587 Grp Volume(v), veh/h 152 517 185 241 823 288 204 926 215 212 818 109 Grp Sat Flow(s),veh/h/ln 1755 1729 1576 1755 1729 1578 1755 1729 1586 1755 1729 1587 Q Serve(g_s), s 3.1 5.8 7.0 4.9 9.7 11.4 4.1 11.3 8.2 4.0 9.1 3.6 Cycle Q Clear(g_c), s 3.1 5.8 7.0 4.9 9.7 11.4 4.1 11.3 8.2 4.0 9.1 3.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 235 1447 440 290 1529 465 298 1462 447 477 1726 528 V/C Ratio(X) 0.65 0.36 0.42 0.83 0.54 0.62 0.68 0.63 0.48 0.44 0.47 0.21 Avail Cap(c_a), veh/h 290 2431 738 290 2431 739 435 2431 743 484 2502 766 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.0 20.9 21.4 32.8 21.4 22.1 32.2 22.8 21.6 28.8 19.2 17.3 Incr Delay (d2), s/veh 3.5 0.1 0.6 18.0 0.3 1.4 2.8 0.5 0.8 0.7 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 2.1 2.4 2.7 3.5 3.9 1.7 4.1 2.8 1.6 3.2 1.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.5 21.1 22.0 50.8 21.7 23.4 35.0 23.2 22.4 29.5 19.4 17.5 LnGrp LOS D C C D C C D C C C B B
Approach Vol, veh/h 854 1352 1345 1139
Approach Delay, s/veh 24.0 27.3 24.9 21.1
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.9 24.4 10.0 24.2 10.2 28.1 8.9 25.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 34.0 6.0 34.0 9.0 35.0 6.0 34.0 Max Q Clear Time (g_c+I1), s 6.0 13.3 6.9 9.0 6.1 11.1 5.1 13.4 Green Ext Time (p_c), s 0.2 6.6 0.0 3.9 0.2 5.6 0.0 6.3 Intersection Summary
HCM 7th Control Delay, s/veh 24.5
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/20/2025
Existing Year 2025 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 38 77 199 83 123 49 173 1273 84 30 1115 62 Future Volume (veh/h) 38 77 199 83 123 49 173 1273 84 30 1115 62 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 40 80 207 86 128 51 180 1326 88 31 1161 65 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 73 329 279 113 372 311 225 2267 688 61 1797 545 Arrive On Green 0.04 0.17 0.17 0.06 0.20 0.20 0.12 0.44 0.44 0.03 0.35 0.35 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 40 80 207 86 128 51 180 1326 88 31 1161 65 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 1.3 2.2 7.5 2.9 3.6 1.6 5.9 11.9 2.0 1.0 11.6 1.7 Cycle Q Clear(g_c), s 1.3 2.2 7.5 2.9 3.6 1.6 5.9 11.9 2.0 1.0 11.6 1.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 73 329 279 113 372 311 225 2267 688 61 1797 545 V/C Ratio(X) 0.55 0.24 0.74 0.76 0.34 0.16 0.80 0.58 0.13 0.51 0.65 0.12 Avail Cap(c_a), veh/h 177 1208 1024 148 1177 984 266 3130 951 177 2876 873 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.9 21.9 24.0 28.3 21.3 20.5 26.1 13.1 10.3 29.1 16.9 13.7 Incr Delay (d2), s/veh 6.3 0.4 3.9 15.1 0.5 0.2 13.9 0.2 0.1 6.5 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 1.0 3.0 1.7 1.5 0.6 3.1 3.5 0.6 0.5 3.7 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.2 22.3 27.9 43.4 21.8 20.7 40.0 13.3 10.4 35.7 17.3 13.8 LnGrp LOS D C C D C C D B B D B B
Approach Vol, veh/h 327 265 1594 1257
Approach Delay, s/veh 27.4 28.6 16.1 17.5
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.1 30.8 7.8 16.6 11.6 25.2 6.5 18.0 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 37.0 5.0 39.0 9.0 34.0 6.0 38.0 Max Q Clear Time (g_c+I1), s 3.0 13.9 4.9 9.5 7.9 13.6 3.3 5.6 Green Ext Time (p_c), s 0.0 9.6 0.0 1.1 0.0 7.7 0.0 0.9 Intersection Summary
HCM 7th Control Delay, s/veh 18.7
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
Appendix C. Year 2027 Cumulative
Peak Hour Analysis Worksheets
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 33 1142 28 2 811 38 5 4 0 33 12 30 Future Volume (veh/h) 33 1142 28 2 811 38 5 4 0 33 12 30 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 35 1202 29 2 854 40 5 4 0 35 13 32 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.96 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 76 2095 51 6 1842 86 326 210 0 264 112 143
Arrive On Green 0.04 0.40 0.40 0.00 0.36 0.36 0.22 0.22 0.00 0.22 0.22 0.22 Sat Flow, veh/h 1810 5209 126 1810 5071 237 686 958 0 467 512 652 Grp Volume(v), veh/h 35 798 433 2 582 312 9 0 0 80 0 0
Grp Sat Flow(s),veh/h/ln 1810 1729 1877 1810 1729 1850 1643 0 0 1631 0 0 Q Serve(g_s), s 0.6 5.7 5.7 0.0 4.1 4.1 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.6 5.7 5.7 0.0 4.1 4.1 0.1 0.0 0.0 1.2 0.0 0.0 Prop In Lane 1.00 0.07 1.00 0.13 0.56 0.00 0.44 0.40
Lane Grp Cap(c), veh/h 76 1391 755 6 1256 672 536 0 0 520 0 0 V/C Ratio(X) 0.46 0.57 0.57 0.35 0.46 0.46 0.02 0.00 0.00 0.15 0.00 0.00 Avail Cap(c_a), veh/h 283 1949 1058 283 1949 1043 1422 0 0 1402 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 14.9 7.4 7.4 15.9 7.8 7.8 9.8 0.0 0.0 10.2 0.0 0.0 Incr Delay (d2), s/veh 4.4 0.4 0.7 33.6 0.3 0.5 0.0 0.0 0.0 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.8 1.0 0.1 0.7 0.8 0.0 0.0 0.0 0.3 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 19.3 7.8 8.1 49.4 8.1 8.3 9.8 0.0 0.0 10.3 0.0 0.0 LnGrp LOS B A A D A A A B
Approach Vol, veh/h 1266 896 9 80
Approach Delay, s/veh 8.2 8.2 9.8 10.3
Approach LOS A A A B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.1 16.8 11.0 5.3 15.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.1 2.0 7.7 3.2 2.6 6.1
Green Ext Time (p_c), s 0.0 0.0 5.1 0.3 0.0 4.0
Intersection Summary
HCM 7th Control Delay, s/veh 8.3
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/28/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 176 696 388 139 611 152 289 1247 258 188 1083 128 Future Volume (veh/h) 176 696 388 139 611 152 289 1247 258 188 1083 128 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 202 800 446 160 702 175 332 1433 297 216 1245 147 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 267 1601 491 221 1533 597 398 1779 653 277 1600 619 Arrive On Green 0.08 0.33 0.33 0.07 0.32 0.32 0.12 0.37 0.37 0.08 0.33 0.33 Sat Flow, veh/h 3291 4863 1491 3291 4863 1491 3291 4863 1508 3291 4863 1508 Grp Volume(v), veh/h 202 800 446 160 702 175 332 1433 297 216 1245 147 Grp Sat Flow(s),veh/h/ln 1646 1621 1491 1646 1621 1491 1646 1621 1508 1646 1621 1508 Q Serve(g_s), s 6.2 13.7 29.8 5.0 12.0 8.3 10.3 27.6 14.5 6.7 24.0 6.6 Cycle Q Clear(g_c), s 6.2 13.7 29.8 5.0 12.0 8.3 10.3 27.6 14.5 6.7 24.0 6.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 267 1601 491 221 1533 597 398 1779 653 277 1600 619 V/C Ratio(X) 0.76 0.50 0.91 0.72 0.46 0.29 0.83 0.81 0.45 0.78 0.78 0.24 Avail Cap(c_a), veh/h 380 1683 516 285 1543 600 475 2057 739 316 1824 688 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 46.8 28.0 33.4 47.6 28.5 21.3 44.7 29.7 20.8 46.7 31.5 20.0 Incr Delay (d2), s/veh 5.3 0.2 19.5 6.4 0.2 0.3 10.6 2.1 0.5 10.4 1.9 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.6 5.0 12.6 2.1 4.4 2.7 4.5 10.0 4.8 3.0 8.9 2.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 52.1 28.3 52.9 54.0 28.7 21.5 55.3 31.8 21.3 57.1 33.4 20.2 LnGrp LOS D C D D C C E C C E C C
Approach Vol, veh/h 1448 1037 2062 1608
Approach Delay, s/veh 39.2 31.4 34.1 35.4
Approach LOS D C C D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 12.8 42.0 11.0 38.2 16.6 38.2 12.4 36.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 44.0 9.0 36.0 15.0 39.0 12.0 33.0 Max Q Clear Time (g_c+I1), s 8.7 29.6 7.0 31.8 12.3 26.0 8.2 14.0 Green Ext Time (p_c), s 0.1 8.5 0.1 2.4 0.3 6.6 0.2 4.7 Intersection Summary
HCM 7th Control Delay, s/veh 35.2
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Rosedale Highway & NW Promenade 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 67 1265 808 61 86 50
Future Volume (veh/h) 67 1265 808 61 86 50
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 74 1390 888 67 95 55
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 268 2965 1887 585 580 266
Arrive On Green 0.08 0.57 0.36 0.36 0.17 0.17
Sat Flow, veh/h 3510 5358 5358 1608 3510 1610
Grp Volume(v), veh/h 74 1390 888 67 95 55
Grp Sat Flow(s),veh/h/ln 1755 1729 1729 1608 1755 1610
Q Serve(g_s), s 0.6 4.8 4.0 0.8 0.7 0.9
Cycle Q Clear(g_c), s 0.6 4.8 4.0 0.8 0.7 0.9
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 268 2965 1887 585 580 266
V/C Ratio(X) 0.28 0.47 0.47 0.11 0.16 0.21
Avail Cap(c_a), veh/h 577 5115 3580 1110 3693 1694
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 13.3 3.8 7.4 6.4 10.9 11.0
Incr Delay (d2), s/veh 0.6 0.1 0.2 0.1 0.1 0.4
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 0.6 0.0 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.8 3.9 7.6 6.5 11.0 11.4
LnGrp LOS B A A A B B
Approach Vol, veh/h 1464 955 150
Approach Delay, s/veh 4.4 7.5 11.1
Approach LOS A A B
Timer - Assigned Phs 4 6 7 8
Phs Duration (G+Y+Rc), s 21.4 9.0 6.3 15.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 30.0 32.0 5.0 21.0
Max Q Clear Time (g_c+I1), s 6.8 2.9 2.6 6.0
Green Ext Time (p_c), s 9.8 0.5 0.0 5.0
Intersection Summary
HCM 7th Control Delay, s/veh 6.0
HCM 7th LOS A
" +++ 1 7 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 120 1067 12 14 710 90 10 23 48 223 25 112 Future Volume (veh/h) 120 1067 12 14 710 90 10 23 48 223 25 112 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 135 1199 13 16 798 101 11 26 54 251 28 126 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 308 1970 612 36 1619 503 50 534 237 402 896 393 Arrive On Green 0.09 0.38 0.38 0.02 0.31 0.31 0.01 0.15 0.15 0.11 0.25 0.25 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1600 3510 3610 1582 Grp Volume(v), veh/h 135 1199 13 16 798 101 11 26 54 251 28 126 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1600 1755 1805 1582 Q Serve(g_s), s 1.7 8.8 0.2 0.4 5.9 2.2 0.1 0.3 1.4 3.2 0.3 3.1 Cycle Q Clear(g_c), s 1.7 8.8 0.2 0.4 5.9 2.2 0.1 0.3 1.4 3.2 0.3 3.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 308 1970 612 36 1619 503 50 534 237 402 896 393 V/C Ratio(X) 0.44 0.61 0.02 0.44 0.49 0.20 0.22 0.05 0.23 0.62 0.03 0.32 Avail Cap(c_a), veh/h 519 3066 952 191 2847 884 371 2287 1014 815 2744 1203 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 20.5 11.8 9.2 22.9 13.2 12.0 23.1 17.3 17.8 20.0 13.5 14.5 Incr Delay (d2), s/veh 1.0 0.3 0.0 8.2 0.2 0.2 2.2 0.0 0.5 1.6 0.0 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 2.3 0.1 0.2 1.7 0.6 0.1 0.1 0.4 1.2 0.1 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.5 12.2 9.2 31.1 13.5 12.1 25.3 17.4 18.3 21.6 13.5 15.0 LnGrp LOS C B A C B B C B B C B B
Approach Vol, veh/h 1347 915 91 405
Approach Delay, s/veh 13.1 13.6 18.9 19.0
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.4 11.0 4.9 22.0 4.7 15.7 8.2 18.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 30.0 5.0 28.0 5.0 36.0 7.0 26.0 Max Q Clear Time (g_c+I1), s 5.2 3.4 2.4 10.8 2.1 5.1 3.7 7.9 Green Ext Time (p_c), s 0.4 0.3 0.0 7.2 0.0 0.5 0.1 5.0 Intersection Summary
HCM 7th Control Delay, s/veh 14.3
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 126 484 161 309 745 109 242 668 202 91 946 254 Future Volume (veh/h) 126 484 161 309 745 109 242 668 202 91 946 254 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 138 532 177 340 819 120 266 734 222 100 1040 279 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 212 986 305 390 1248 387 304 2034 631 191 1300 572 Arrive On Green 0.06 0.20 0.20 0.12 0.25 0.25 0.09 0.41 0.41 0.06 0.38 0.38 Sat Flow, veh/h 3319 4904 1518 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 138 532 177 340 819 120 266 734 222 100 1040 279 Grp Sat Flow(s),veh/h/ln 1659 1635 1518 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 3.1 7.4 8.1 7.7 11.4 4.9 6.1 7.9 7.7 2.2 20.8 10.8 Cycle Q Clear(g_c), s 3.1 7.4 8.1 7.7 11.4 4.9 6.1 7.9 7.7 2.2 20.8 10.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 212 986 305 390 1248 387 304 2034 631 191 1300 572 V/C Ratio(X) 0.65 0.54 0.58 0.87 0.66 0.31 0.88 0.36 0.35 0.52 0.80 0.49 Avail Cap(c_a), veh/h 304 2050 635 390 2178 675 304 2306 715 304 1605 706 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.0 27.4 27.7 33.2 25.5 23.1 34.3 15.4 15.3 35.1 21.1 18.0 Incr Delay (d2), s/veh 3.3 0.5 1.7 18.8 0.6 0.5 23.8 0.1 0.3 2.2 2.4 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 2.7 2.8 3.9 4.0 1.6 3.2 2.5 2.3 0.9 7.4 3.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 38.3 27.9 29.4 52.0 26.1 23.5 58.1 15.5 15.7 37.3 23.5 18.7 LnGrp LOS D C C D C C E B B D C B
Approach Vol, veh/h 847 1279 1222 1419
Approach Delay, s/veh 29.9 32.8 24.8 23.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.4 35.8 13.0 19.4 11.0 33.2 8.9 23.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 36.0 9.0 32.0 7.0 36.0 7.0 34.0 Max Q Clear Time (g_c+I1), s 4.2 9.9 9.7 10.1 8.1 22.8 5.1 13.4 Green Ext Time (p_c), s 0.1 3.5 0.0 3.8 0.0 6.2 0.1 5.4 Intersection Summary
HCM 7th Control Delay, s/veh 27.5
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 80 689 20 20 519 91 52 28 34 338 77 99 Future Volume (veh/h) 80 689 20 20 519 91 52 28 34 338 77 99 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 85 733 21 21 552 97 55 30 36 360 82 105 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 125 1394 430 46 813 359 96 291 245 429 640 541 Arrive On Green 0.07 0.27 0.27 0.03 0.23 0.23 0.05 0.15 0.15 0.24 0.34 0.34 Sat Flow, veh/h 1810 5187 1598 1810 3610 1596 1810 1900 1601 1810 1900 1606 Grp Volume(v), veh/h 85 733 21 21 552 97 55 30 36 360 82 105 Grp Sat Flow(s),veh/h/ln 1810 1729 1598 1810 1805 1596 1810 1900 1601 1810 1900 1606 Q Serve(g_s), s 2.3 6.1 0.5 0.6 7.1 2.5 1.5 0.7 1.0 9.6 1.5 2.3 Cycle Q Clear(g_c), s 2.3 6.1 0.5 0.6 7.1 2.5 1.5 0.7 1.0 9.6 1.5 2.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 125 1394 430 46 813 359 96 291 245 429 640 541 V/C Ratio(X) 0.68 0.53 0.05 0.46 0.68 0.27 0.57 0.10 0.15 0.84 0.13 0.19 Avail Cap(c_a), veh/h 179 1843 568 179 1283 567 214 938 790 572 1313 1110 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 23.0 15.8 13.7 24.3 17.9 16.2 23.4 18.5 18.6 18.4 11.6 11.9 Incr Delay (d2), s/veh 6.4 0.3 0.0 7.0 1.0 0.4 5.2 0.2 0.3 8.3 0.1 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 1.9 0.1 0.3 2.4 0.8 0.7 0.3 0.3 4.4 0.5 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.5 16.1 13.8 31.4 19.0 16.6 28.7 18.6 18.9 26.7 11.7 12.1 LnGrp LOS C B B C B B C B B C B B
Approach Vol, veh/h 839 670 121 547
Approach Delay, s/veh 17.4 19.0 23.3 21.6
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 16.0 11.8 5.3 17.6 6.7 21.1 7.5 15.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 16.0 25.0 5.0 18.0 6.0 35.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 11.6 3.0 2.6 8.1 3.5 4.3 4.3 9.1 Green Ext Time (p_c), s 0.5 0.2 0.0 3.2 0.0 0.8 0.0 1.9 Intersection Summary
HCM 7th Control Delay, s/veh 19.3
HCM 7th LOS B
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 23 633 242 107 447 18 125 26 174 37 55 14 Future Volume (veh/h) 23 633 242 107 447 18 125 26 174 37 55 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 26 728 278 123 514 21 144 30 200 43 63 16 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 56 1038 448 158 1242 549 184 422 356 84 316 263 Arrive On Green 0.03 0.29 0.29 0.09 0.34 0.34 0.10 0.22 0.22 0.05 0.17 0.17 Sat Flow, veh/h 1810 3610 1557 1810 3610 1596 1810 1900 1606 1810 1900 1583 Grp Volume(v), veh/h 26 728 278 123 514 21 144 30 200 43 63 16 Grp Sat Flow(s),veh/h/ln 1810 1805 1557 1810 1805 1596 1810 1900 1606 1810 1900 1583 Q Serve(g_s), s 0.6 8.1 6.9 3.0 4.9 0.4 3.5 0.6 5.0 1.0 1.3 0.4 Cycle Q Clear(g_c), s 0.6 8.1 6.9 3.0 4.9 0.4 3.5 0.6 5.0 1.0 1.3 0.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 56 1038 448 158 1242 549 184 422 356 84 316 263 V/C Ratio(X) 0.47 0.70 0.62 0.78 0.41 0.04 0.78 0.07 0.56 0.51 0.20 0.06 Avail Cap(c_a), veh/h 202 1530 660 202 1530 677 202 1060 896 202 1060 883 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.4 14.3 13.9 20.0 11.2 9.8 19.6 13.8 15.5 20.9 16.1 15.7 Incr Delay (d2), s/veh 5.9 0.9 1.4 13.6 0.2 0.0 16.4 0.1 1.4 4.8 0.3 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.4 1.9 1.6 1.4 0.1 2.1 0.2 1.5 0.5 0.5 0.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.3 15.1 15.3 33.6 11.5 9.8 36.1 13.9 16.9 25.7 16.4 15.8 LnGrp LOS C B B C B A D B B C B B
Approach Vol, veh/h 1032 658 374 122
Approach Delay, s/veh 15.5 15.5 24.0 19.6
Approach LOS B B C B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.1 13.9 7.9 16.9 8.6 11.5 5.4 19.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 25.0 5.0 19.0 5.0 25.0 5.0 19.0 Max Q Clear Time (g_c+I1), s 3.0 7.0 5.0 10.1 5.5 3.3 2.6 6.9 Green Ext Time (p_c), s 0.0 0.7 0.0 2.3 0.0 0.3 0.0 2.3 Intersection Summary
HCM 7th Control Delay, s/veh 17.2
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 264 0 574 428 441 427 303 1116 2 2 1430 182 Future Volume (veh/h) 264 0 574 428 441 427 303 1116 2 2 1430 182 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 322 0 700 594 438 521 370 1361 2 2 1744 222 Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 555 0 493 847 445 753 368 2404 4 5 1800 558
Arrive On Green 0.16 0.00 0.16 0.24 0.24 0.24 0.11 0.46 0.46 0.00 0.36 0.36 Sat Flow, veh/h 3506 0 3114 3506 1841 3116 3401 5182 8 1753 5025 1559 Grp Volume(v), veh/h 322 0 700 594 438 521 370 880 483 2 1744 222 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1839 1753 1675 1559 Q Serve(g_s), s 10.2 0.0 19.0 18.6 28.4 18.3 13.0 22.9 22.9 0.1 40.9 12.8 Cycle Q Clear(g_c), s 10.2 0.0 19.0 18.6 28.4 18.3 13.0 22.9 22.9 0.1 40.9 12.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 555 0 493 847 445 753 368 1554 853 5 1800 558 V/C Ratio(X) 0.58 0.00 1.42 0.70 0.98 0.69 1.00 0.57 0.57 0.42 0.97 0.40 Avail Cap(c_a), veh/h 555 0 493 847 445 753 368 1554 853 73 1801 559 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 46.8 0.0 50.5 41.5 45.3 41.4 53.5 23.4 23.4 59.7 37.8 28.8 Incr Delay (d2), s/veh 1.5 0.0 200.5 2.6 38.5 2.7 47.9 0.5 0.9 50.9 14.5 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.4 0.0 20.8 8.0 17.1 7.0 7.8 8.4 9.3 0.1 17.9 4.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 48.3 0.0 251.0 44.1 83.8 44.1 101.4 23.9 24.3 110.6 52.3 29.3 LnGrp LOS D F D F D F C C F D C
Approach Vol, veh/h 1022 1553 1733 1968
Approach Delay, s/veh 187.1 55.3 40.5 49.8
Approach LOS F E D D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.3 59.7 23.0 17.0 47.0 33.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 51.0 19.0 13.0 43.0 29.0 Max Q Clear Time (g_c+I1), s 2.1 24.9 21.0 15.0 42.9 30.4 Green Ext Time (p_c), s 0.0 9.0 0.0 0.0 0.1 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 71.0
HCM 7th LOS E
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 765 31 31 556 72 87
Future Volume (veh/h) 765 31 31 556 72 87
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 869 35 35 632 82 99
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1444 58 76 2076 134 162
Arrive On Green 0.41 0.41 0.04 0.57 0.18 0.18
Sat Flow, veh/h 3631 142 1810 3705 764 922
Grp Volume(v), veh/h 444 460 35 632 182 0
Grp Sat Flow(s),veh/h/ln 1805 1874 1810 1805 1696 0
Q Serve(g_s), s 6.2 6.2 0.6 2.9 3.2 0.0
Cycle Q Clear(g_c), s 6.2 6.2 0.6 2.9 3.2 0.0
Prop In Lane 0.08 1.00 0.45 0.54
Lane Grp Cap(c), veh/h 737 765 76 2076 297 0
V/C Ratio(X) 0.60 0.60 0.46 0.30 0.61 0.00
Avail Cap(c_a), veh/h 1521 1579 395 4283 741 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 7.4 7.4 15.0 3.5 12.2 0.0
Incr Delay (d2), s/veh 0.8 0.8 4.4 0.1 2.0 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.0 1.1 0.3 0.0 1.1 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 8.2 8.2 19.4 3.6 14.2 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 904 667 182
Approach Delay, s/veh 8.2 4.4 14.2
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 9.6 5.3 17.1 22.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 14.0 7.0 27.0 38.0
Max Q Clear Time (g_c+I1), s 5.2 2.6 8.2 4.9
Green Ext Time (p_c), s 0.3 0.0 4.9 4.1
Intersection Summary
HCM 7th Control Delay, s/veh 7.4
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 173 340 296 133 309 233 225 887 130 247 1169 143 Future Volume (veh/h) 173 340 296 133 309 233 225 887 130 247 1169 143 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 201 395 344 155 359 271 262 1031 151 287 1359 166 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 294 927 715 240 872 387 358 1734 530 386 1775 550 Arrive On Green 0.08 0.26 0.26 0.07 0.24 0.24 0.10 0.33 0.33 0.11 0.34 0.34 Sat Flow, veh/h 3510 3610 2784 3510 3610 1602 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 201 395 344 155 359 271 262 1031 151 287 1359 166 Grp Sat Flow(s),veh/h/ln 1755 1805 1392 1755 1805 1602 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 3.9 6.3 7.3 3.0 5.8 10.7 5.0 11.5 4.9 5.5 16.2 5.3 Cycle Q Clear(g_c), s 3.9 6.3 7.3 3.0 5.8 10.7 5.0 11.5 4.9 5.5 16.2 5.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 294 927 715 240 872 387 358 1734 530 386 1775 550 V/C Ratio(X) 0.68 0.43 0.48 0.65 0.41 0.70 0.73 0.59 0.28 0.74 0.77 0.30 Avail Cap(c_a), veh/h 354 1769 1365 253 1665 739 405 1944 595 455 2019 626 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.9 21.5 21.9 31.5 22.2 24.0 30.2 19.2 17.0 29.9 20.3 16.7 Incr Delay (d2), s/veh 4.1 0.3 0.5 5.2 0.3 2.3 5.9 0.4 0.3 5.5 1.6 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.6 2.4 2.1 1.3 2.2 3.8 2.2 3.9 1.6 2.4 5.7 1.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.0 21.8 22.4 36.7 22.5 26.3 36.1 19.6 17.3 35.4 21.9 17.0 LnGrp LOS D C C D C C D B B D C B
Approach Vol, veh/h 940 785 1444 1812
Approach Delay, s/veh 24.8 26.6 22.3 23.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.6 27.2 8.7 21.8 11.1 27.7 9.8 20.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 9.0 26.0 5.0 34.0 8.0 27.0 7.0 32.0 Max Q Clear Time (g_c+I1), s 7.5 13.5 5.0 9.3 7.0 18.2 5.9 12.7 Green Ext Time (p_c), s 0.2 5.5 0.0 3.7 0.1 5.5 0.1 2.8 Intersection Summary
HCM 7th Control Delay, s/veh 24.0
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 6 696 156 92 473 6 153 6 159 21 16 9 Future Volume (veh/h) 6 696 156 92 473 6 153 6 159 21 16 9 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 8 870 195 115 591 8 191 8 199 26 20 11 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 26 1233 532 181 1556 21 300 13 277 96 74 41
Arrive On Green 0.01 0.34 0.34 0.10 0.43 0.43 0.17 0.17 0.17 0.12 0.12 0.12 Sat Flow, veh/h 1810 3610 1559 1810 3645 49 1740 73 1607 819 630 347 Grp Volume(v), veh/h 8 870 195 115 293 306 199 0 199 57 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1559 1810 1805 1889 1813 0 1607 1796 0 0 Q Serve(g_s), s 0.3 12.5 5.6 3.6 6.6 6.6 6.1 0.0 7.0 1.7 0.0 0.0 Cycle Q Clear(g_c), s 0.3 12.5 5.6 3.6 6.6 6.6 6.1 0.0 7.0 1.7 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.03 0.96 1.00 0.46 0.19
Lane Grp Cap(c), veh/h 26 1233 532 181 771 807 313 0 277 211 0 0 V/C Ratio(X) 0.30 0.71 0.37 0.64 0.38 0.38 0.64 0.00 0.72 0.27 0.00 0.00 Avail Cap(c_a), veh/h 213 1696 732 304 939 983 578 0 512 211 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 29.1 17.0 14.8 25.8 11.7 11.7 22.9 0.0 23.3 24.0 0.0 0.0 Incr Delay (d2), s/veh 6.3 0.8 0.4 3.7 0.3 0.3 2.1 0.0 3.5 0.7 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 4.2 1.6 1.6 2.1 2.2 2.5 0.0 2.5 0.7 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.4 17.8 15.2 29.4 12.0 12.0 25.1 0.0 26.7 24.7 0.0 0.0 LnGrp LOS D B B C B B C C C
Approach Vol, veh/h 1073 714 398 57
Approach Delay, s/veh 17.5 14.8 25.9 24.7
Approach LOS B B C C
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 14.3 10.0 24.4 11.0 4.9 29.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 19.0 10.0 28.0 7.0 7.0 31.0 Max Q Clear Time (g_c+I1), s 9.0 5.6 14.5 3.7 2.3 8.6
Green Ext Time (p_c), s 1.2 0.1 5.1 0.0 0.0 3.1
Intersection Summary
HCM 7th Control Delay, s/veh 18.3
HCM 7th LOS B
h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 64 421 195 282 245 52 129 92 243 78 176 15 Future Volume (veh/h) 64 421 195 282 245 52 129 92 243 78 176 15 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.92 1.00 0.91 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 75 495 229 332 288 61 152 108 286 92 207 18 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 97 704 314 438 960 428 232 768 598 138 707 62 Arrive On Green 0.05 0.20 0.20 0.12 0.27 0.27 0.07 0.40 0.40 0.08 0.41 0.41 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1480 1810 1708 148 Grp Volume(v), veh/h 75 495 229 332 288 61 152 108 286 92 0 225 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1480 1810 0 1856 Q Serve(g_s), s 3.3 10.2 10.7 7.3 5.1 2.3 3.4 2.9 11.4 4.0 0.0 6.5 Cycle Q Clear(g_c), s 3.3 10.2 10.7 7.3 5.1 2.3 3.4 2.9 11.4 4.0 0.0 6.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.08
Lane Grp Cap(c), veh/h 97 704 314 438 960 428 232 768 598 138 0 769 V/C Ratio(X) 0.77 0.70 0.73 0.76 0.30 0.14 0.65 0.14 0.48 0.67 0.00 0.29 Avail Cap(c_a), veh/h 203 1126 502 526 1262 563 351 806 628 181 0 788 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 37.4 30.1 30.3 33.9 23.5 22.4 36.5 15.1 17.6 36.0 0.0 15.6 Incr Delay (d2), s/veh 12.0 1.3 3.2 5.2 0.2 0.2 3.1 0.1 0.6 5.8 0.0 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.7 4.2 4.1 3.2 2.0 0.8 1.5 1.1 3.5 1.9 0.0 2.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 49.4 31.4 33.5 39.1 23.6 22.6 39.6 15.2 18.2 41.9 0.0 15.8 LnGrp LOS D C C D C C D B B D B
Approach Vol, veh/h 799 681 546 317
Approach Delay, s/veh 33.7 31.1 23.6 23.4
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.1 36.4 14.0 19.6 9.3 37.2 8.3 25.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 34.0 12.0 25.0 8.0 34.0 9.0 28.0 Max Q Clear Time (g_c+I1), s 6.0 13.4 9.3 12.7 5.4 8.5 5.3 7.1 Green Ext Time (p_c), s 0.0 1.5 0.3 2.9 0.1 1.1 0.0 1.7 Intersection Summary
HCM 7th Control Delay, s/veh 29.2
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 55 593 25 40 257 73 41 49 130 230 37 82 Future Volume (veh/h) 55 593 25 40 257 73 41 49 130 230 37 82 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 69 741 31 50 321 91 51 61 162 288 46 102 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 114 1137 505 92 1093 485 181 332 280 430 467 389 Arrive On Green 0.06 0.31 0.31 0.05 0.30 0.30 0.05 0.17 0.17 0.12 0.25 0.25 Sat Flow, veh/h 1810 3610 1602 1810 3610 1602 3510 1900 1602 3510 1900 1584 Grp Volume(v), veh/h 69 741 31 50 321 91 51 61 162 288 46 102 Grp Sat Flow(s),veh/h/ln 1810 1805 1602 1810 1805 1602 1755 1900 1602 1755 1900 1584 Q Serve(g_s), s 1.8 8.4 0.6 1.3 3.2 2.0 0.7 1.3 4.4 3.7 0.9 2.5 Cycle Q Clear(g_c), s 1.8 8.4 0.6 1.3 3.2 2.0 0.7 1.3 4.4 3.7 0.9 2.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 114 1137 505 92 1093 485 181 332 280 430 467 389 V/C Ratio(X) 0.61 0.65 0.06 0.54 0.29 0.19 0.28 0.18 0.58 0.67 0.10 0.26 Avail Cap(c_a), veh/h 229 1977 878 191 1901 844 370 1401 1181 592 1521 1268 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.7 14.0 11.4 22.0 12.7 12.2 21.7 16.7 18.0 19.9 13.8 14.4 Incr Delay (d2), s/veh 5.1 0.6 0.1 4.9 0.1 0.2 0.8 0.3 1.9 1.8 0.1 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 2.6 0.2 0.6 1.0 0.5 0.3 0.5 1.4 1.4 0.3 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 26.8 14.7 11.4 26.9 12.8 12.4 22.5 17.0 19.9 21.7 13.9 14.8 LnGrp LOS C B B C B B C B B C B B
Approach Vol, veh/h 841 462 274 436
Approach Delay, s/veh 15.5 14.3 19.7 19.3
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.8 12.3 6.4 18.9 6.4 15.7 7.0 18.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 35.0 5.0 26.0 5.0 38.0 6.0 25.0 Max Q Clear Time (g_c+I1), s 5.7 6.4 3.3 10.4 2.7 4.5 3.8 5.2 Green Ext Time (p_c), s 0.2 0.8 0.0 4.1 0.0 0.5 0.0 2.0 Intersection Summary
HCM 7th Control Delay, s/veh 16.6
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 22 327 377 148 161 100 198 884 197 160 1174 26 Future Volume (veh/h) 22 327 377 148 161 100 198 884 197 160 1174 26 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 23 348 401 157 171 106 211 940 210 170 1249 28 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 89 1085 483 242 1784 546 306 1793 549 238 1692 518 Arrive On Green 0.03 0.30 0.30 0.07 0.34 0.34 0.09 0.35 0.35 0.07 0.33 0.33 Sat Flow, veh/h 3510 3610 1609 3510 5187 1587 3510 5187 1588 3510 5187 1588 Grp Volume(v), veh/h 23 348 401 157 171 106 211 940 210 170 1249 28 Grp Sat Flow(s),veh/h/ln 1755 1805 1609 1755 1729 1587 1755 1729 1588 1755 1729 1588 Q Serve(g_s), s 0.5 5.5 17.1 3.2 1.6 3.5 4.3 10.7 7.3 3.5 15.7 0.9 Cycle Q Clear(g_c), s 0.5 5.5 17.1 3.2 1.6 3.5 4.3 10.7 7.3 3.5 15.7 0.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 89 1085 483 242 1784 546 306 1793 549 238 1692 518 V/C Ratio(X) 0.26 0.32 0.83 0.65 0.10 0.19 0.69 0.52 0.38 0.71 0.74 0.05 Avail Cap(c_a), veh/h 238 1567 698 333 2393 732 476 2463 754 238 2111 647 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.2 20.0 24.0 33.4 16.4 17.0 32.7 19.3 18.2 33.6 22.0 17.0 Incr Delay (d2), s/veh 1.5 0.2 5.6 2.9 0.0 0.2 2.8 0.2 0.4 9.7 1.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 2.1 6.4 1.4 0.6 1.1 1.8 3.7 2.4 1.7 5.7 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.7 20.1 29.6 36.4 16.4 17.2 35.4 19.5 18.6 43.3 23.1 17.1 LnGrp LOS D C C D B B D B B D C B
Approach Vol, veh/h 772 434 1361 1447
Approach Delay, s/veh 25.6 23.8 21.8 25.4
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.0 29.5 9.1 26.1 10.4 28.0 5.9 29.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 7.0 32.0 10.0 30.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 5.5 12.7 5.2 19.1 6.3 17.7 2.5 5.5 Green Ext Time (p_c), s 0.0 6.8 0.1 2.8 0.2 6.2 0.0 1.3 Intersection Summary
HCM 7th Control Delay, s/veh 24.0
HCM 7th LOS C
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 49 1001 211 220 551 43 140 473 162 43 582 48 Future Volume (veh/h) 49 1001 211 220 551 43 140 473 162 43 582 48 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 52 1065 224 234 586 46 149 503 172 46 619 51 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 162 1341 597 330 1422 111 246 912 404 151 1171 360 Arrive On Green 0.05 0.37 0.37 0.09 0.42 0.42 0.07 0.25 0.25 0.04 0.23 0.23 Sat Flow, veh/h 3510 3610 1608 3510 3391 266 3510 3610 1597 3510 5187 1595 Grp Volume(v), veh/h 52 1065 224 234 311 321 149 503 172 46 619 51 Grp Sat Flow(s),veh/h/ln 1755 1805 1608 1755 1805 1852 1755 1805 1597 1755 1729 1595 Q Serve(g_s), s 1.0 17.6 6.8 4.3 8.1 8.1 2.8 8.1 6.0 0.9 7.0 1.7 Cycle Q Clear(g_c), s 1.0 17.6 6.8 4.3 8.1 8.1 2.8 8.1 6.0 0.9 7.0 1.7 Prop In Lane 1.00 1.00 1.00 0.14 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 162 1341 597 330 757 777 246 912 404 151 1171 360 V/C Ratio(X) 0.32 0.79 0.38 0.71 0.41 0.41 0.61 0.55 0.43 0.31 0.53 0.14 Avail Cap(c_a), veh/h 262 1562 695 367 835 856 262 1777 786 262 2553 785 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.9 18.8 15.4 29.5 13.7 13.7 30.3 21.7 21.0 31.1 22.8 20.8 Incr Delay (d2), s/veh 1.1 2.5 0.4 5.5 0.4 0.4 3.6 0.5 0.7 1.1 0.4 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 6.8 2.2 1.9 2.9 3.0 1.2 3.0 2.1 0.3 2.5 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 32.1 21.3 15.8 35.0 14.0 14.0 33.9 22.3 21.7 32.2 23.2 20.9 LnGrp LOS C C B C B B C C C C C C
Approach Vol, veh/h 1341 866 824 716
Approach Delay, s/veh 20.8 19.7 24.2 23.6
Approach LOS C B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.9 20.9 10.3 28.9 8.7 19.1 7.1 32.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 33.0 7.0 29.0 5.0 33.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 2.9 10.1 6.3 19.6 4.8 9.0 3.0 10.1 Green Ext Time (p_c), s 0.0 3.4 0.1 5.2 0.0 3.8 0.0 3.5 Intersection Summary
HCM 7th Control Delay, s/veh 21.8
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 144 817 150 143 518 42 191 586 127 168 699 175 Future Volume (veh/h) 144 817 150 143 518 42 191 586 127 168 699 175 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 152 860 158 151 545 44 201 617 134 177 736 184 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 267 1688 516 266 1687 509 305 1322 410 282 1288 399 Arrive On Green 0.08 0.33 0.33 0.08 0.33 0.33 0.09 0.25 0.25 0.08 0.25 0.25 Sat Flow, veh/h 3510 5187 1586 3510 5187 1565 3510 5187 1608 3510 5187 1608 Grp Volume(v), veh/h 152 860 158 151 545 44 201 617 134 177 736 184 Grp Sat Flow(s),veh/h/ln 1755 1729 1586 1755 1729 1565 1755 1729 1608 1755 1729 1608 Q Serve(g_s), s 2.5 8.1 4.5 2.5 4.8 1.2 3.4 6.1 4.1 3.0 7.5 5.9 Cycle Q Clear(g_c), s 2.5 8.1 4.5 2.5 4.8 1.2 3.4 6.1 4.1 3.0 7.5 5.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 267 1688 516 266 1687 509 305 1322 410 282 1288 399 V/C Ratio(X) 0.57 0.51 0.31 0.57 0.32 0.09 0.66 0.47 0.33 0.63 0.57 0.46 Avail Cap(c_a), veh/h 347 2648 810 347 2648 799 405 2819 874 520 2989 927 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.1 16.6 15.3 27.1 15.4 14.2 26.9 19.1 18.4 27.0 20.0 19.4 Incr Delay (d2), s/veh 1.9 0.2 0.3 1.9 0.1 0.1 2.4 0.3 0.5 2.3 0.4 0.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 2.7 1.4 1.0 1.6 0.4 1.3 2.0 1.3 1.2 2.5 1.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.0 16.8 15.7 29.0 15.6 14.3 29.3 19.4 18.9 29.3 20.4 20.2 LnGrp LOS C B B C B B C B B C C C
Approach Vol, veh/h 1170 740 952 1097
Approach Delay, s/veh 18.2 18.2 21.4 21.8
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.9 19.5 8.6 23.8 9.3 19.1 8.6 23.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 9.0 33.0 6.0 31.0 7.0 35.0 6.0 31.0 Max Q Clear Time (g_c+I1), s 5.0 8.1 4.5 10.1 5.4 9.5 4.5 6.8 Green Ext Time (p_c), s 0.2 4.1 0.1 6.1 0.1 5.2 0.1 3.4 Intersection Summary
HCM 7th Control Delay, s/veh 20.0
HCM 7th LOS B
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/21/2025 Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 43 91 271 153 107 59 172 836 204 44 886 18 Future Volume (veh/h) 43 91 271 153 107 59 172 836 204 44 886 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 47 99 295 166 116 64 187 909 222 48 963 20 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 82 457 379 210 592 492 233 1390 338 83 1300 402 Arrive On Green 0.05 0.24 0.24 0.12 0.31 0.31 0.13 0.33 0.33 0.05 0.25 0.25 Sat Flow, veh/h 1810 1900 1576 1810 1900 1579 1810 4160 1012 1810 5187 1604 Grp Volume(v), veh/h 47 99 295 166 116 64 187 755 376 48 963 20 Grp Sat Flow(s),veh/h/ln 1810 1900 1576 1810 1900 1579 1810 1729 1714 1810 1729 1604 Q Serve(g_s), s 1.5 2.5 10.6 5.4 2.7 1.8 6.1 11.3 11.4 1.6 10.4 0.6 Cycle Q Clear(g_c), s 1.5 2.5 10.6 5.4 2.7 1.8 6.1 11.3 11.4 1.6 10.4 0.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.59 1.00 1.00
Lane Grp Cap(c), veh/h 82 457 379 210 592 492 233 1155 573 83 1300 402 V/C Ratio(X) 0.58 0.22 0.78 0.79 0.20 0.13 0.80 0.65 0.66 0.58 0.74 0.05 Avail Cap(c_a), veh/h 149 689 571 268 814 677 298 1311 650 149 1539 476 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.4 18.4 21.5 26.1 15.3 15.0 25.7 17.2 17.2 28.4 20.9 17.2 Incr Delay (d2), s/veh 6.3 0.2 3.9 11.7 0.2 0.1 11.4 1.0 2.0 6.3 1.6 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 1.0 3.7 2.8 1.0 0.6 3.0 3.6 3.8 0.7 3.6 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 34.7 18.7 25.4 37.8 15.5 15.1 37.1 18.2 19.2 34.7 22.5 17.3 LnGrp LOS C B C D B B D B B C C B
Approach Vol, veh/h 441 346 1318 1031
Approach Delay, s/veh 24.9 26.1 21.2 23.0
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.8 24.3 11.0 18.6 11.8 19.2 6.7 22.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 23.0 9.0 22.0 10.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.6 13.4 7.4 12.6 8.1 12.4 3.5 4.7 Green Ext Time (p_c), s 0.0 4.5 0.1 1.0 0.1 2.7 0.0 0.7 Intersection Summary
HCM 7th Control Delay, s/veh 22.8
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 17 4 32 85 10 48 49 1189 117 60 1215 27 Future Volume (veh/h) 17 4 32 85 10 48 49 1189 117 60 1215 27 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 19 4 35 93 11 53 54 1307 129 66 1335 30 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 43 21 183 274 340 285 100 1879 581 115 1921 581 Arrive On Green 0.02 0.12 0.12 0.08 0.18 0.18 0.06 0.36 0.36 0.06 0.37 0.37 Sat Flow, veh/h 1810 168 1468 3510 1900 1589 1810 5187 1604 1810 5187 1570 Grp Volume(v), veh/h 19 0 39 93 11 53 54 1307 129 66 1335 30 Grp Sat Flow(s),veh/h/ln 1810 0 1636 1755 1900 1589 1810 1729 1604 1810 1729 1570 Q Serve(g_s), s 0.4 0.0 0.9 1.1 0.2 1.2 1.3 9.2 2.4 1.5 9.4 0.5 Cycle Q Clear(g_c), s 0.4 0.0 0.9 1.1 0.2 1.2 1.3 9.2 2.4 1.5 9.4 0.5 Prop In Lane 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 43 0 204 274 340 285 100 1879 581 115 1921 581 V/C Ratio(X) 0.44 0.00 0.19 0.34 0.03 0.19 0.54 0.70 0.22 0.58 0.69 0.05 Avail Cap(c_a), veh/h 210 0 988 408 1147 960 210 2169 670 210 2169 656 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 20.7 0.0 16.9 18.8 14.6 15.0 19.8 11.7 9.5 19.6 11.5 8.7 Incr Delay (d2), s/veh 7.1 0.0 0.4 0.7 0.0 0.3 4.5 0.8 0.2 4.5 0.8 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 0.3 0.4 0.1 0.4 0.5 2.2 0.6 0.6 2.3 0.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.8 0.0 17.3 19.5 14.6 15.3 24.3 12.5 9.7 24.1 12.3 8.7 LnGrp LOS C B B B B C B A C B A
Approach Vol, veh/h 58 157 1490 1431
Approach Delay, s/veh 20.8 17.8 12.7 12.8
Approach LOS C B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.7 19.6 7.4 9.4 6.4 19.9 5.0 11.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 18.0 5.0 26.0 5.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.5 11.2 3.1 2.9 3.3 11.4 2.4 3.2 Green Ext Time (p_c), s 0.0 4.3 0.0 0.1 0.0 4.1 0.0 0.2 Intersection Summary
HCM 7th Control Delay, s/veh 13.2
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 136 0 189 0 0 0 177 1227 0 0 1159 170 Future Volume (veh/h) 136 0 189 0 0 0 177 1227 0 0 1159 170 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 151 0 210 0 0 0 197 1363 0 0 1288 189 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 1042 0 320 0 377 0 250 3163 0 0 1949 605
Arrive On Green 0.20 0.00 0.20 0.00 0.00 0.00 0.14 0.61 0.00 0.00 0.38 0.38 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 151 0 210 0 0 0 197 1363 0 0 1288 189 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 1.5 0.0 5.0 0.0 0.0 0.0 4.4 5.8 0.0 0.0 8.6 3.5 Cycle Q Clear(g_c), s 1.5 0.0 5.0 0.0 0.0 0.0 4.4 5.8 0.0 0.0 8.6 3.5 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 1042 0 320 0 377 0 250 3163 0 0 1949 605 V/C Ratio(X) 0.14 0.00 0.66 0.00 0.00 0.00 0.79 0.43 0.00 0.00 0.66 0.31 Avail Cap(c_a), veh/h 2195 0 849 0 1001 0 303 3728 0 0 2361 733 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 14.0 0.0 15.4 0.0 0.0 0.0 17.4 4.3 0.0 0.0 10.8 9.2 Incr Delay (d2), s/veh 0.1 0.0 2.3 0.0 0.0 0.0 10.8 0.1 0.0 0.0 0.5 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 1.5 0.0 0.0 0.0 2.1 0.3 0.0 0.0 1.9 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 14.1 0.0 17.7 0.0 0.0 0.0 28.2 4.4 0.0 0.0 11.3 9.5 LnGrp LOS B B C A B A
Approach Vol, veh/h 361 0 1560 1477
Approach Delay, s/veh 16.2 0.0 7.4 11.1
Approach LOS B A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 29.5 12.3 9.8 19.7 12.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 30.0 22.0 7.0 19.0 22.0
Max Q Clear Time (g_c+I1), s 7.8 7.0 6.4 10.6 0.0
Green Ext Time (p_c), s 9.1 1.4 0.0 5.1 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 9.9
HCM 7th LOS A
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Jet Way 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 60 12 1704 73 10 1584
Future Volume (veh/h) 60 12 1704 73 10 1584
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 71 14 2005 86 12 1864
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 136 121 3078 955 39 3685
Arrive On Green 0.07 0.07 0.59 0.59 0.02 0.71
Sat Flow, veh/h 1810 1610 5358 1610 1810 5358
Grp Volume(v), veh/h 71 14 2005 86 12 1864
Grp Sat Flow(s),veh/h/ln 1810 1610 1729 1610 1810 1729
Q Serve(g_s), s 1.6 0.3 10.7 1.0 0.3 6.8
Cycle Q Clear(g_c), s 1.6 0.3 10.7 1.0 0.3 6.8
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 136 121 3078 955 39 3685
V/C Ratio(X) 0.52 0.12 0.65 0.09 0.30 0.51
Avail Cap(c_a), veh/h 1079 960 3710 1152 302 5070
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 18.7 18.1 5.7 3.7 20.2 2.7
Incr Delay (d2), s/veh 3.1 0.4 0.3 0.0 4.3 0.1
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 0.1 0.9 0.2 0.1 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.8 18.5 6.0 3.7 24.5 2.9
LnGrp LOS C B A A C A
Approach Vol, veh/h 85 2091 1876
Approach Delay, s/veh 21.3 5.9 3.0
Approach LOS C A A
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 4.9 28.9 33.8 8.1
Change Period (Y+Rc), s 4.0 4.0 4.0 5.0
Max Green Setting (Gmax), s 7.0 30.0 41.0 25.0
Max Q Clear Time (g_c+I1), s 2.3 12.7 8.8 3.6
Green Ext Time (p_c), s 0.0 12.1 16.2 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 4.9
HCM 7th LOS A
h 7 1 7 " 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 297 201 0 1653 1642 605
Future Volume (veh/h) 297 201 0 1653 1642 605
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 366 184 0 1837 1824 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 681 303 0 3187 3187
Arrive On Green 0.19 0.19 0.00 0.61 0.61 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 366 184 0 1837 1824 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 3.7 4.2 0.0 8.6 8.5 0.0
Cycle Q Clear(g_c), s 3.7 4.2 0.0 8.6 8.5 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 681 303 0 3187 3187
V/C Ratio(X) 0.54 0.61 0.00 0.58 0.57
Avail Cap(c_a), veh/h 1340 596 0 4739 4739
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 14.8 15.1 0.0 4.7 4.6 0.0
Incr Delay (d2), s/veh 0.7 2.0 0.0 0.2 0.2 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.3 1.5 0.0 0.4 0.4 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 15.5 17.0 0.0 4.8 4.8 0.0
LnGrp LOS B B A A
Approach Vol, veh/h 550 1837 1824
Approach Delay, s/veh 16.0 4.8 4.8
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 28.9 11.6 28.9
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 37.0 15.0 37.0
Max Q Clear Time (g_c+I1), s 10.6 6.2 10.5
Green Ext Time (p_c), s 14.3 1.4 14.2
Intersection Summary
HCM 7th Control Delay, s/veh 6.3
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 408 0 68 0 1585 724 359 1479 0 Future Volume (veh/h) 0 0 0 408 0 68 0 1585 724 359 1479 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 458 0 76 0 1781 813 403 1662 0 Peak Hour Factor 0.95 0.95 0.95 0.89 0.95 0.89 0.95 0.89 0.89 0.89 0.89 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 3 0 640 0 569 0 2357 1007 525 3512 0
Arrive On Green 0.00 0.00 0.00 0.18 0.00 0.18 0.00 0.45 0.45 0.15 0.68 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 458 0 76 0 1781 813 403 1662 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 6.5 0.0 1.1 0.0 15.6 21.1 6.0 8.3 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 6.5 0.0 1.1 0.0 15.6 21.1 6.0 8.3 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 3 0 640 0 569 0 2357 1007 525 3512 0 V/C Ratio(X) 0.00 0.00 0.00 0.72 0.00 0.13 0.00 0.76 0.81 0.77 0.47 0.00 Avail Cap(c_a), veh/h 0 239 0 1191 0 1707 0 2371 1011 578 3603 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 21.2 0.0 19.0 0.0 12.4 7.6 22.4 4.2 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 1.5 0.0 0.1 0.0 1.4 4.9 5.7 0.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 2.5 0.0 0.4 0.0 4.2 4.8 2.4 0.8 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 22.7 0.0 19.1 0.0 13.8 12.5 28.0 4.3 0.0 LnGrp LOS C B B B C A
Approach Vol, veh/h 0 534 2594 2065
Approach Delay, s/veh 0.0 22.2 13.4 8.9
Approach LOS C B A
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 12.2 28.9 13.7 0.0 41.0 13.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 9.0 25.0 18.0 7.0 38.0 29.0 Max Q Clear Time (g_c+I1), s 8.0 23.1 8.5 0.0 10.3 3.1
Green Ext Time (p_c), s 0.2 1.8 1.2 0.0 12.9 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 12.5
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/21/2025 Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 157 324 63 199 522 325 243 1598 163 260 965 440 Future Volume (veh/h) 157 324 63 199 522 325 243 1598 163 260 965 440 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 176 364 71 224 587 365 273 1796 183 292 1084 494 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 227 1289 395 291 1384 424 344 2012 204 352 2193 681 Arrive On Green 0.06 0.25 0.25 0.08 0.27 0.27 0.10 0.42 0.42 0.10 0.42 0.42 Sat Flow, veh/h 3510 5187 1589 3510 5187 1588 3510 4785 486 3510 5187 1610 Grp Volume(v), veh/h 176 364 71 224 587 365 273 1296 683 292 1084 494 Grp Sat Flow(s),veh/h/ln 1755 1729 1589 1755 1729 1588 1755 1729 1813 1755 1729 1610 Q Serve(g_s), s 5.3 6.1 3.8 6.8 10.1 23.7 8.2 37.6 37.9 8.8 16.5 27.7 Cycle Q Clear(g_c), s 5.3 6.1 3.8 6.8 10.1 23.7 8.2 37.6 37.9 8.8 16.5 27.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.27 1.00 1.00
Lane Grp Cap(c), veh/h 227 1289 395 291 1384 424 344 1454 762 352 2193 681 V/C Ratio(X) 0.78 0.28 0.18 0.77 0.42 0.86 0.79 0.89 0.90 0.83 0.49 0.73 Avail Cap(c_a), veh/h 227 1390 426 389 1629 499 487 1502 787 357 2193 681 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 49.8 32.9 32.0 48.6 32.8 37.8 47.7 29.1 29.2 47.8 22.8 26.0 Incr Delay (d2), s/veh 15.4 0.1 0.2 6.5 0.2 12.7 5.9 7.0 12.7 14.9 0.2 3.9 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.8 2.5 1.4 3.1 4.1 10.3 3.7 15.3 17.4 4.4 6.1 10.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 65.2 33.0 32.2 55.1 33.0 50.5 53.7 36.0 41.9 62.7 23.0 29.9 LnGrp LOS E C C E C D D D D E C C
Approach Vol, veh/h 611 1176 2252 1870
Approach Delay, s/veh 42.2 42.7 40.0 31.0
Approach LOS D D D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.9 49.5 13.0 30.9 14.6 49.8 11.0 32.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 47.0 12.0 29.0 15.0 43.0 7.0 34.0 Max Q Clear Time (g_c+I1), s 10.8 39.9 8.8 8.1 10.2 29.7 7.3 25.7 Green Ext Time (p_c), s 0.0 5.6 0.2 2.3 0.4 6.9 0.0 3.2 Intersection Summary
HCM 7th Control Delay, s/veh 37.9
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 200 0 243 0 0 0 103 611 0 0 1009 112 Future Volume (veh/h) 200 0 243 0 0 0 103 611 0 0 1009 112 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 217 0 264 0 0 0 112 664 0 0 1097 122 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 610 0 0 0 5 0 330 3121 0 0 2050 628
Arrive On Green 0.17 0.00 0.00 0.00 0.00 0.00 0.09 0.60 0.00 0.00 0.40 0.40 Sat Flow, veh/h 3510 217 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 217 13.3 0 0 0 112 664 0 0 1097 122 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 1.9 0.0 0.0 0.0 1.1 2.1 0.0 0.0 5.8 1.8 Cycle Q Clear(g_c), s 1.9 0.0 0.0 0.0 1.1 2.1 0.0 0.0 5.8 1.8 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 610 0 5 0 330 3121 0 0 2050 628
V/C Ratio(X) 0.36 0.00 0.00 0.00 0.34 0.21 0.00 0.00 0.54 0.19 Avail Cap(c_a), veh/h 2761 0 1548 0 493 4517 0 0 3206 982 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 13.0 0.0 0.0 0.0 15.1 3.2 0.0 0.0 8.3 7.1 Incr Delay (d2), s/veh 0.4 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.2 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 0.0 0.0 0.3 0.0 0.0 0.0 1.1 0.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.3 0.0 0.0 0.0 15.7 3.3 0.0 0.0 8.5 7.2 LnGrp LOS B B A A A
Approach Vol, veh/h 0 776 1219
Approach Delay, s/veh 0.0 5.1 8.3
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 25.4 7.3 18.1 10.2 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 4.1 3.1 7.8 3.9 0.0
Green Ext Time (p_c), s 4.2 0.0 6.2 0.7 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.7
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 134 784 183 206 384 158 86 480 190 380 772 92 Future Volume (veh/h) 134 784 183 206 384 158 86 480 190 380 772 92 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.98 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 144 843 197 222 413 170 92 516 204 409 830 99 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 254 1529 465 275 1560 475 221 1136 347 550 1622 496 Arrive On Green 0.07 0.29 0.29 0.08 0.30 0.30 0.06 0.22 0.22 0.16 0.31 0.31 Sat Flow, veh/h 3510 5187 1576 3510 5187 1578 3510 5187 1585 3510 5187 1587 Grp Volume(v), veh/h 144 843 197 222 413 170 92 516 204 409 830 99 Grp Sat Flow(s),veh/h/ln 1755 1729 1576 1755 1729 1578 1755 1729 1585 1755 1729 1587 Q Serve(g_s), s 2.5 8.7 6.4 4.0 3.9 5.4 1.6 5.5 7.4 7.1 8.3 2.9 Cycle Q Clear(g_c), s 2.5 8.7 6.4 4.0 3.9 5.4 1.6 5.5 7.4 7.1 8.3 2.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 254 1529 465 275 1560 475 221 1136 347 550 1622 496 V/C Ratio(X) 0.57 0.55 0.42 0.81 0.26 0.36 0.42 0.45 0.59 0.74 0.51 0.20 Avail Cap(c_a), veh/h 275 2767 841 275 2767 842 331 2849 870 551 3174 971 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.6 18.9 18.1 28.9 16.9 17.5 28.7 21.6 22.3 25.6 17.9 16.1 Incr Delay (d2), s/veh 2.3 0.3 0.6 16.0 0.1 0.5 1.2 0.3 1.6 5.4 0.3 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 3.0 2.1 2.1 1.3 1.7 0.6 1.9 2.5 3.0 2.8 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.9 19.2 18.7 44.9 17.0 17.9 30.0 21.9 23.9 31.0 18.2 16.2 LnGrp LOS C B B D B B C C C C B B
Approach Vol, veh/h 1184 805 812 1338
Approach Delay, s/veh 20.6 24.9 23.3 22.0
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.0 18.0 9.0 22.8 8.0 23.9 8.6 23.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 35.0 5.0 34.0 6.0 39.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 9.1 9.4 6.0 10.7 3.6 10.3 4.5 7.4 Green Ext Time (p_c), s 0.2 3.9 0.0 6.3 0.0 5.9 0.0 3.2 Intersection Summary
HCM 7th Control Delay, s/veh 22.4
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 57 87 180 84 36 71 96 677 60 52 1077 55 Future Volume (veh/h) 57 87 180 84 36 71 96 677 60 52 1077 55 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 64 98 202 94 40 80 108 761 67 58 1210 62 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 101 331 281 122 354 296 140 2046 621 95 1918 582 Arrive On Green 0.06 0.17 0.17 0.07 0.19 0.19 0.08 0.39 0.39 0.05 0.37 0.37 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 64 98 202 94 40 80 108 761 67 58 1210 62 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 2.0 2.6 6.8 3.0 1.0 2.5 3.4 6.0 1.6 1.8 11.1 1.5 Cycle Q Clear(g_c), s 2.0 2.6 6.8 3.0 1.0 2.5 3.4 6.0 1.6 1.8 11.1 1.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 101 331 281 122 354 296 140 2046 621 95 1918 582 V/C Ratio(X) 0.64 0.30 0.72 0.77 0.11 0.27 0.77 0.37 0.11 0.61 0.63 0.11 Avail Cap(c_a), veh/h 282 1282 1086 188 1183 988 219 3050 926 250 3140 953 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.7 20.8 22.5 26.5 19.6 20.2 26.2 12.4 11.1 26.8 15.0 12.0 Incr Delay (d2), s/veh 6.5 0.5 3.5 9.8 0.1 0.5 8.7 0.1 0.1 6.2 0.3 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 1.1 2.7 1.5 0.4 0.9 1.6 1.8 0.5 0.8 3.4 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 33.3 21.3 26.0 36.4 19.7 20.6 34.9 12.5 11.1 33.0 15.3 12.0 LnGrp LOS C C C D B C C B B C B B
Approach Vol, veh/h 364 214 936 1330
Approach Delay, s/veh 26.0 27.4 15.0 15.9
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.0 26.8 7.9 16.1 8.5 25.4 7.2 16.8 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 8.0 34.0 6.0 39.0 7.0 35.0 9.0 36.0 Max Q Clear Time (g_c+I1), s 3.8 8.0 5.0 8.8 5.4 13.1 4.0 4.5 Green Ext Time (p_c), s 0.0 5.1 0.0 1.2 0.0 8.3 0.0 0.5 Intersection Summary
HCM 7th Control Delay, s/veh 17.8
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 24 993 6 3 1494 24 9 2 2 50 0 47 Future Volume (veh/h) 24 993 6 3 1494 24 9 2 2 50 0 47
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 26 1079 7 3 1624 26 10 2 2 54 0 51 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 58 2496 16 7 2322 37 359 72 43 265 43 148
Arrive On Green 0.03 0.47 0.47 0.00 0.44 0.44 0.19 0.19 0.19 0.19 0.00 0.19 Sat Flow, veh/h 1810 5317 34 1810 5256 84 969 373 224 586 223 764 Grp Volume(v), veh/h 26 702 384 3 1068 582 14 0 0 105 0 0 Grp Sat Flow(s),veh/h/ln 1810 1729 1894 1810 1729 1882 1565 0 0 1573 0 0 Q Serve(g_s), s 0.5 4.9 4.9 0.1 9.0 9.0 0.0 0.0 0.0 0.1 0.0 0.0 Cycle Q Clear(g_c), s 0.5 4.9 4.9 0.1 9.0 9.0 0.2 0.0 0.0 1.9 0.0 0.0 Prop In Lane 1.00 0.02 1.00 0.04 0.71 0.14 0.51 0.49
Lane Grp Cap(c), veh/h 58 1623 889 7 1527 831 475 0 0 456 0 0 V/C Ratio(X) 0.45 0.43 0.43 0.40 0.70 0.70 0.03 0.00 0.00 0.23 0.00 0.00 Avail Cap(c_a), veh/h 251 1725 945 251 1725 939 1205 0 0 1212 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 17.2 6.4 6.4 17.9 8.1 8.1 11.8 0.0 0.0 12.5 0.0 0.0 Incr Delay (d2), s/veh 5.5 0.2 0.3 31.7 1.1 2.0 0.0 0.0 0.0 0.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.7 0.8 0.1 1.6 2.0 0.1 0.0 0.0 0.6 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 22.6 6.6 6.7 49.7 9.2 10.1 11.8 0.0 0.0 12.7 0.0 0.0 LnGrp LOS C A A D A B B B
Approach Vol, veh/h 1112 1653 14 105
Approach Delay, s/veh 7.0 9.6 11.8 12.7
Approach LOS A A B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.1 20.9 11.0 5.1 19.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.2 2.1 6.9 3.9 2.5 11.0
Green Ext Time (p_c), s 0.0 0.0 4.7 0.5 0.0 4.9
Intersection Summary
HCM 7th Control Delay, s/veh 8.7
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 189 677 366 244 945 244 403 1412 197 250 1125 175 Future Volume (veh/h) 189 677 366 244 945 244 403 1412 197 250 1125 175 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 195 698 377 252 974 252 415 1456 203 258 1160 180 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 342 1452 445 275 1354 564 413 1710 657 326 1581 647 Arrive On Green 0.10 0.30 0.30 0.08 0.28 0.28 0.13 0.35 0.35 0.10 0.33 0.33 Sat Flow, veh/h 3291 4863 1490 3291 4863 1490 3291 4863 1508 3291 4863 1508 Grp Volume(v), veh/h 195 698 377 252 974 252 415 1456 203 258 1160 180 Grp Sat Flow(s),veh/h/ln 1646 1621 1490 1646 1621 1490 1646 1621 1508 1646 1621 1508 Q Serve(g_s), s 5.4 11.2 22.7 7.3 17.3 12.1 12.0 26.5 8.4 7.3 20.2 7.4 Cycle Q Clear(g_c), s 5.4 11.2 22.7 7.3 17.3 12.1 12.0 26.5 8.4 7.3 20.2 7.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 342 1452 445 275 1354 564 413 1710 657 326 1581 647 V/C Ratio(X) 0.57 0.48 0.85 0.92 0.72 0.45 1.01 0.85 0.31 0.79 0.73 0.28 Avail Cap(c_a), veh/h 344 1728 530 275 1627 648 413 1830 694 378 1779 709 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 40.8 27.5 31.5 43.5 31.2 22.3 41.8 28.7 17.6 42.1 28.6 17.7 Incr Delay (d2), s/veh 2.2 0.2 10.6 33.0 1.3 0.6 45.6 3.9 0.3 9.6 1.4 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.2 4.1 8.8 4.1 6.4 4.0 7.2 9.8 2.7 3.2 7.3 2.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 43.0 27.7 42.1 76.5 32.4 22.9 87.5 32.6 17.9 51.7 30.0 17.9 LnGrp LOS D C D E C C F C B D C B
Approach Vol, veh/h 1270 1478 2074 1598
Approach Delay, s/veh 34.4 38.3 42.1 32.2
Approach LOS C D D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.5 37.6 12.0 32.6 16.0 35.1 13.9 30.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 36.0 8.0 34.0 12.0 35.0 10.0 32.0 Max Q Clear Time (g_c+I1), s 9.3 28.5 9.3 24.7 14.0 22.2 7.4 19.3 Green Ext Time (p_c), s 0.1 5.1 0.0 3.9 0.0 6.2 0.1 5.6 Intersection Summary
HCM 7th Control Delay, s/veh 37.2
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Rosedale Highway & NW Promenade 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 149 1127 1358 134 167 106
Future Volume (veh/h) 149 1127 1358 134 167 106
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 154 1162 1400 138 172 109
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 359 3287 2239 694 586 269
Arrive On Green 0.10 0.63 0.43 0.43 0.17 0.17
Sat Flow, veh/h 3510 5358 5358 1608 3510 1610
Grp Volume(v), veh/h 154 1162 1400 138 172 109
Grp Sat Flow(s),veh/h/ln 1755 1729 1729 1608 1755 1610
Q Serve(g_s), s 1.7 4.2 8.4 2.1 1.7 2.4
Cycle Q Clear(g_c), s 1.7 4.2 8.4 2.1 1.7 2.4
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 359 3287 2239 694 586 269
V/C Ratio(X) 0.43 0.35 0.63 0.20 0.29 0.41
Avail Cap(c_a), veh/h 438 4009 2845 882 2713 1244
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 16.9 3.5 8.9 7.1 14.6 14.9
Incr Delay (d2), s/veh 0.8 0.1 0.3 0.1 0.3 1.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 0.2 1.7 0.0 0.6 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.7 3.5 9.2 7.2 14.9 15.9
LnGrp LOS B A A A B B
Approach Vol, veh/h 1316 1538 281
Approach Delay, s/veh 5.2 9.0 15.3
Approach LOS A A B
Timer - Assigned Phs 4 6 7 8
Phs Duration (G+Y+Rc), s 29.4 10.7 8.1 21.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 31.0 5.0 22.0
Max Q Clear Time (g_c+I1), s 6.2 4.4 3.7 10.4
Green Ext Time (p_c), s 8.0 0.9 0.1 6.9
Intersection Summary
HCM 7th Control Delay, s/veh 8.0
HCM 7th LOS A
" +++ 1 7 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 146 1016 20 59 1255 145 20 20 32 221 36 156 Future Volume (veh/h) 146 1016 20 59 1255 145 20 20 32 221 36 156 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 149 1037 20 60 1281 148 20 20 33 226 37 159 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 296 2099 651 101 1949 605 85 481 213 357 762 334 Arrive On Green 0.08 0.40 0.40 0.06 0.38 0.38 0.02 0.13 0.13 0.10 0.21 0.21 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1599 3510 3610 1581 Grp Volume(v), veh/h 149 1037 20 60 1281 148 20 20 33 226 37 159 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1599 1755 1805 1581 Q Serve(g_s), s 2.1 7.8 0.4 1.7 10.7 3.3 0.3 0.3 1.0 3.2 0.4 4.6 Cycle Q Clear(g_c), s 2.1 7.8 0.4 1.7 10.7 3.3 0.3 0.3 1.0 3.2 0.4 4.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 296 2099 651 101 1949 605 85 481 213 357 762 334 V/C Ratio(X) 0.50 0.49 0.03 0.60 0.66 0.24 0.24 0.04 0.15 0.63 0.05 0.48 Avail Cap(c_a), veh/h 401 2569 798 207 2569 798 334 2201 975 669 2545 1114 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 23.0 11.6 9.4 24.2 13.6 11.3 25.1 19.8 20.1 22.6 16.5 18.2 Incr Delay (d2), s/veh 1.3 0.2 0.0 5.6 0.4 0.2 1.4 0.0 0.3 1.9 0.0 1.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 2.2 0.1 0.8 3.1 0.9 0.1 0.1 0.3 1.3 0.2 1.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 24.3 11.8 9.4 29.8 14.0 11.5 26.6 19.9 20.5 24.5 16.5 19.2 LnGrp LOS C B A C B B C B C C B B
Approach Vol, veh/h 1206 1489 73 422
Approach Delay, s/veh 13.3 14.4 22.0 21.8
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.3 11.0 6.9 25.2 5.3 15.1 8.4 23.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 32.0 6.0 26.0 5.0 37.0 6.0 26.0 Max Q Clear Time (g_c+I1), s 5.2 3.0 3.7 9.8 2.3 6.6 4.1 12.7 Green Ext Time (p_c), s 0.3 0.2 0.0 6.0 0.0 0.7 0.1 7.0 Intersection Summary
HCM 7th Control Delay, s/veh 15.1
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 241 907 365 238 601 144 323 1095 354 140 916 210 Future Volume (veh/h) 241 907 365 238 601 144 323 1095 354 140 916 210 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 243 916 369 240 607 145 326 1106 358 141 925 212 Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 226 1497 464 264 1553 481 339 1817 563 209 1131 498 Arrive On Green 0.07 0.31 0.31 0.08 0.32 0.32 0.10 0.37 0.37 0.06 0.33 0.33 Sat Flow, veh/h 3319 4904 1519 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 243 916 369 240 607 145 326 1106 358 141 925 212 Grp Sat Flow(s),veh/h/ln 1659 1635 1519 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 6.0 14.1 19.6 6.3 8.5 6.4 8.6 16.2 17.1 3.7 21.9 9.7 Cycle Q Clear(g_c), s 6.0 14.1 19.6 6.3 8.5 6.4 8.6 16.2 17.1 3.7 21.9 9.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 226 1497 464 264 1553 481 339 1817 563 209 1131 498 V/C Ratio(X) 1.08 0.61 0.80 0.91 0.39 0.30 0.96 0.61 0.64 0.67 0.82 0.43 Avail Cap(c_a), veh/h 226 1781 552 264 1837 569 339 2059 639 301 1394 614 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.1 26.1 28.1 40.2 23.5 22.7 39.4 22.5 22.8 40.4 27.0 22.9 Incr Delay (d2), s/veh 81.3 0.5 6.8 32.8 0.2 0.3 38.6 0.4 1.7 3.7 3.2 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.9 5.0 7.3 3.6 3.0 2.1 5.1 5.6 5.7 1.5 8.5 3.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 122.3 26.6 34.8 73.1 23.6 23.1 78.0 23.0 24.5 44.1 30.3 23.5 LnGrp LOS F C C E C C E C C D C C
Approach Vol, veh/h 1528 992 1790 1278
Approach Delay, s/veh 43.8 35.5 33.3 30.7
Approach LOS D D C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.6 36.6 11.0 30.9 13.0 33.2 10.0 31.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 37.0 7.0 32.0 9.0 36.0 6.0 33.0 Max Q Clear Time (g_c+I1), s 5.7 18.2 8.3 21.6 10.6 23.9 8.0 10.5 Green Ext Time (p_c), s 0.1 5.3 0.0 5.0 0.0 5.1 0.0 4.2 Intersection Summary
HCM 7th Control Delay, s/veh 36.0
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 111 745 20 21 1007 278 47 38 28 179 46 114 Future Volume (veh/h) 111 745 20 21 1007 278 47 38 28 179 46 114 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 116 776 21 22 1049 290 49 40 29 186 48 119 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 149 2114 653 47 1268 562 87 272 229 237 429 362 Arrive On Green 0.08 0.41 0.41 0.03 0.35 0.35 0.05 0.14 0.14 0.13 0.23 0.23 Sat Flow, veh/h 1810 5187 1602 1810 3610 1601 1810 1900 1600 1810 1900 1604 Grp Volume(v), veh/h 116 776 21 22 1049 290 49 40 29 186 48 119 Grp Sat Flow(s),veh/h/ln 1810 1729 1602 1810 1805 1601 1810 1900 1600 1810 1900 1604 Q Serve(g_s), s 3.4 5.7 0.4 0.7 14.5 7.8 1.4 1.0 0.9 5.4 1.1 3.4 Cycle Q Clear(g_c), s 3.4 5.7 0.4 0.7 14.5 7.8 1.4 1.0 0.9 5.4 1.1 3.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 149 2114 653 47 1268 562 87 272 229 237 429 362 V/C Ratio(X) 0.78 0.37 0.03 0.47 0.83 0.52 0.56 0.15 0.13 0.79 0.11 0.33 Avail Cap(c_a), veh/h 165 2114 653 165 1453 644 165 904 761 364 1112 939 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.6 11.3 9.7 26.3 16.2 14.1 25.5 20.5 20.4 23.0 16.8 17.7 Incr Delay (d2), s/veh 18.9 0.1 0.0 7.1 3.7 0.7 5.6 0.2 0.2 6.1 0.1 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.0 1.6 0.1 0.3 5.1 2.2 0.7 0.4 0.3 2.5 0.4 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 43.5 11.4 9.7 33.3 19.9 14.8 31.1 20.8 20.7 29.1 16.9 18.2 LnGrp LOS D B A C B B C C C C B B
Approach Vol, veh/h 913 1361 118 353
Approach Delay, s/veh 15.4 19.0 25.0 23.8
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.2 11.8 5.4 26.3 6.6 16.3 8.5 23.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 26.0 5.0 22.0 5.0 32.0 5.0 22.0 Max Q Clear Time (g_c+I1), s 7.4 3.0 2.7 7.7 3.4 5.4 5.4 16.5 Green Ext Time (p_c), s 0.2 0.2 0.0 4.1 0.0 0.6 0.0 2.7 Intersection Summary
HCM 7th Control Delay, s/veh 18.7
HCM 7th LOS B
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 19 784 83 138 745 12 110 32 133 38 18 3 Future Volume (veh/h) 19 784 83 138 745 12 110 32 133 38 18 3 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 20 817 86 144 776 12 115 33 139 40 19 3 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 44 1127 487 184 1406 622 150 380 321 78 304 253 Arrive On Green 0.02 0.31 0.31 0.10 0.39 0.39 0.08 0.20 0.20 0.04 0.16 0.16 Sat Flow, veh/h 1810 3610 1559 1810 3610 1598 1810 1900 1605 1810 1900 1583 Grp Volume(v), veh/h 20 817 86 144 776 12 115 33 139 40 19 3 Grp Sat Flow(s),veh/h/ln 1810 1805 1559 1810 1805 1598 1810 1900 1605 1810 1900 1583 Q Serve(g_s), s 0.5 9.4 1.9 3.6 7.8 0.2 2.9 0.7 3.5 1.0 0.4 0.1 Cycle Q Clear(g_c), s 0.5 9.4 1.9 3.6 7.8 0.2 2.9 0.7 3.5 1.0 0.4 0.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 44 1127 487 184 1406 622 150 380 321 78 304 253 V/C Ratio(X) 0.45 0.72 0.18 0.78 0.55 0.02 0.77 0.09 0.43 0.51 0.06 0.01 Avail Cap(c_a), veh/h 194 1470 635 194 1470 651 194 1018 860 194 1018 848 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.5 14.3 11.7 20.4 11.1 8.8 21.0 15.2 16.4 21.8 16.6 16.5 Incr Delay (d2), s/veh 7.0 1.3 0.2 17.6 0.4 0.0 12.6 0.1 0.9 5.0 0.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.9 0.5 2.1 2.1 0.1 1.6 0.2 1.1 0.5 0.2 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.5 15.5 11.9 38.1 11.5 8.8 33.6 15.3 17.3 26.9 16.7 16.5 LnGrp LOS C B B D B A C B B C B B
Approach Vol, veh/h 923 932 287 62
Approach Delay, s/veh 15.5 15.6 23.6 23.3
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.0 13.3 8.8 18.6 7.9 11.5 5.1 22.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 25.0 5.0 19.0 5.0 25.0 5.0 19.0 Max Q Clear Time (g_c+I1), s 3.0 5.5 5.6 11.4 4.9 2.4 2.5 9.8 Green Ext Time (p_c), s 0.0 0.5 0.0 2.8 0.0 0.0 0.0 3.1 Intersection Summary
HCM 7th Control Delay, s/veh 16.8
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 217 2 642 511 523 518 316 1309 16 4 1641 237 Future Volume (veh/h) 217 2 642 511 523 518 316 1309 16 4 1641 237 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 225 0 662 597 441 534 326 1349 16 4 1692 244 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 586 0 520 849 446 755 341 2313 27 9 1793 556 Arrive On Green 0.17 0.00 0.17 0.24 0.24 0.24 0.10 0.45 0.45 0.01 0.36 0.36 Sat Flow, veh/h 3506 0 3114 3506 1841 3116 3401 5119 61 1753 5025 1559 Grp Volume(v), veh/h 225 0 662 597 441 534 326 883 482 4 1692 244 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1830 1753 1675 1559 Q Serve(g_s), s 6.8 0.0 20.0 18.6 28.6 18.8 11.4 23.5 23.5 0.3 39.1 14.3 Cycle Q Clear(g_c), s 6.8 0.0 20.0 18.6 28.6 18.8 11.4 23.5 23.5 0.3 39.1 14.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.03 1.00 1.00
Lane Grp Cap(c), veh/h 586 0 520 849 446 755 341 1514 827 9 1793 556 V/C Ratio(X) 0.38 0.00 1.27 0.70 0.99 0.71 0.96 0.58 0.58 0.44 0.94 0.44 Avail Cap(c_a), veh/h 586 0 520 849 446 755 341 1514 827 73 1805 560 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 44.4 0.0 49.9 41.4 45.2 41.5 53.6 24.4 24.4 59.4 37.3 29.4 Incr Delay (d2), s/veh 0.4 0.0 137.0 2.6 39.6 3.1 37.2 0.6 1.0 29.8 10.7 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.9 0.0 17.4 8.0 17.3 7.2 6.4 8.6 9.5 0.2 16.5 5.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 44.8 0.0 186.9 44.1 84.8 44.5 90.8 25.0 25.5 89.2 48.0 29.9 LnGrp LOS D F D F D F C C F D C
Approach Vol, veh/h 887 1572 1691 1940
Approach Delay, s/veh 150.9 55.7 37.8 45.8
Approach LOS F E D D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.6 58.1 24.0 16.0 46.7 33.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 50.0 20.0 12.0 43.0 29.0 Max Q Clear Time (g_c+I1), s 2.3 25.5 22.0 13.4 41.1 30.6 Green Ext Time (p_c), s 0.0 8.8 0.0 0.0 1.6 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 61.4
HCM 7th LOS E
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 560 58 61 870 51 40
Future Volume (veh/h) 560 58 61 870 51 40
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 602 62 66 935 55 43
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1152 118 131 2054 130 101
Arrive On Green 0.35 0.35 0.07 0.57 0.14 0.14
Sat Flow, veh/h 3398 340 1810 3705 954 746
Grp Volume(v), veh/h 329 335 66 935 99 0
Grp Sat Flow(s),veh/h/ln 1805 1837 1810 1805 1718 0
Q Serve(g_s), s 3.9 3.9 1.0 4.1 1.4 0.0
Cycle Q Clear(g_c), s 3.9 3.9 1.0 4.1 1.4 0.0
Prop In Lane 0.18 1.00 0.56 0.43
Lane Grp Cap(c), veh/h 630 641 131 2054 233 0
V/C Ratio(X) 0.52 0.52 0.50 0.46 0.42 0.00
Avail Cap(c_a), veh/h 1666 1696 668 5199 825 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 7.0 7.0 12.1 3.4 10.7 0.0
Incr Delay (d2), s/veh 0.7 0.7 3.0 0.2 1.2 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.6 0.3 0.0 0.5 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 7.7 7.7 15.1 3.6 12.0 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 664 1001 99
Approach Delay, s/veh 7.7 4.3 12.0
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 7.7 6.0 13.4 19.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 13.0 10.0 25.0 39.0
Max Q Clear Time (g_c+I1), s 3.4 3.0 5.9 6.1
Green Ext Time (p_c), s 0.1 0.1 3.4 6.7
Intersection Summary
HCM 7th Control Delay, s/veh 6.0
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 174 230 168 159 348 284 222 1350 111 206 1258 144 Future Volume (veh/h) 174 230 168 159 348 284 222 1350 111 206 1258 144 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 181 240 175 166 362 296 231 1406 116 215 1310 150 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 273 939 724 253 918 407 326 1786 546 342 1810 561 Arrive On Green 0.08 0.26 0.26 0.07 0.25 0.25 0.09 0.34 0.34 0.10 0.35 0.35 Sat Flow, veh/h 3510 3610 2785 3510 3610 1603 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 181 240 175 166 362 296 231 1406 116 215 1310 150 Grp Sat Flow(s),veh/h/ln 1755 1805 1392 1755 1805 1603 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 3.5 3.7 3.5 3.3 5.9 12.0 4.5 17.3 3.7 4.2 15.6 4.7 Cycle Q Clear(g_c), s 3.5 3.7 3.5 3.3 5.9 12.0 4.5 17.3 3.7 4.2 15.6 4.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 273 939 724 253 918 407 326 1786 546 342 1810 561 V/C Ratio(X) 0.66 0.26 0.24 0.66 0.39 0.73 0.71 0.79 0.21 0.63 0.72 0.27 Avail Cap(c_a), veh/h 397 1735 1338 298 1633 725 397 1980 606 347 1906 591 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.7 20.7 20.7 32.0 21.9 24.1 31.2 20.9 16.4 30.7 20.1 16.5 Incr Delay (d2), s/veh 2.7 0.1 0.2 4.1 0.3 2.5 4.5 2.0 0.2 3.5 1.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 1.4 1.0 1.4 2.2 4.2 1.9 6.2 1.2 1.8 5.5 1.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 34.5 20.9 20.8 36.0 22.1 26.6 35.7 22.9 16.6 34.2 21.4 16.8 LnGrp LOS C C C D C C D C B C C B
Approach Vol, veh/h 596 824 1753 1675
Approach Delay, s/veh 25.0 26.5 24.1 22.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.9 28.4 9.1 22.4 10.6 28.7 9.5 22.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 27.0 6.0 34.0 8.0 26.0 8.0 32.0 Max Q Clear Time (g_c+I1), s 6.2 19.3 5.3 5.7 6.5 17.6 5.5 14.0 Green Ext Time (p_c), s 0.1 5.1 0.0 2.0 0.1 5.2 0.1 2.9 Intersection Summary
HCM 7th Control Delay, s/veh 24.1
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 482 27 54 664 20 35 3 70 4 4 11 Future Volume (veh/h) 10 482 27 54 664 20 35 3 70 4 4 11 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 11 530 30 59 730 22 38 3 77 4 4 12 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 36 957 412 146 1164 35 259 20 247 52 52 155
Arrive On Green 0.02 0.27 0.27 0.08 0.33 0.33 0.15 0.15 0.15 0.15 0.15 0.15 Sat Flow, veh/h 1810 3610 1553 1810 3574 108 1683 133 1607 339 339 1018 Grp Volume(v), veh/h 11 530 30 59 369 383 41 0 77 20 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1553 1810 1805 1877 1816 0 1607 1697 0 0 Q Serve(g_s), s 0.3 5.8 0.7 1.4 8.0 8.0 0.9 0.0 2.0 0.5 0.0 0.0 Cycle Q Clear(g_c), s 0.3 5.8 0.7 1.4 8.0 8.0 0.9 0.0 2.0 0.5 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.06 0.93 1.00 0.20 0.60
Lane Grp Cap(c), veh/h 36 957 412 146 588 611 280 0 247 258 0 0 V/C Ratio(X) 0.30 0.55 0.07 0.40 0.63 0.63 0.15 0.00 0.31 0.08 0.00 0.00 Avail Cap(c_a), veh/h 276 2199 946 276 1099 1143 869 0 769 258 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 22.2 14.5 12.7 20.1 13.1 13.1 16.8 0.0 17.3 16.7 0.0 0.0 Incr Delay (d2), s/veh 4.6 0.5 0.1 1.8 1.1 1.1 0.2 0.0 0.7 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 1.8 0.2 0.6 2.4 2.5 0.3 0.0 0.6 0.2 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 26.9 15.1 12.7 21.9 14.2 14.2 17.1 0.0 18.0 16.8 0.0 0.0 LnGrp LOS C B B C B B B B B
Approach Vol, veh/h 571 811 118 20
Approach Delay, s/veh 15.2 14.8 17.7 16.8
Approach LOS B B B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.1 7.7 16.2 11.0 4.9 19.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 22.0 7.0 28.0 7.0 7.0 28.0
Max Q Clear Time (g_c+I1), s 4.0 3.4 7.8 2.5 2.3 10.0
Green Ext Time (p_c), s 0.3 0.0 3.1 0.0 0.0 3.8
Intersection Summary
HCM 7th Control Delay, s/veh 15.2
HCM 7th LOS B
h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 24 251 161 227 295 79 159 174 182 46 98 13 Future Volume (veh/h) 24 251 161 227 295 79 159 174 182 46 98 13 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.93 1.00 0.92 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 25 261 168 236 307 82 166 181 190 48 102 14 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 70 555 248 334 759 339 259 864 679 111 714 98 Arrive On Green 0.04 0.15 0.15 0.10 0.21 0.21 0.07 0.45 0.45 0.06 0.44 0.44 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1494 1810 1614 222 Grp Volume(v), veh/h 25 261 168 236 307 82 166 181 190 48 0 116 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1494 1810 0 1836 Q Serve(g_s), s 0.9 4.5 6.7 4.4 5.0 2.9 3.1 3.9 5.4 1.7 0.0 2.6 Cycle Q Clear(g_c), s 0.9 4.5 6.7 4.4 5.0 2.9 3.1 3.9 5.4 1.7 0.0 2.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.12
Lane Grp Cap(c), veh/h 70 555 248 334 759 339 259 864 679 111 0 812 V/C Ratio(X) 0.36 0.47 0.68 0.71 0.40 0.24 0.64 0.21 0.28 0.43 0.00 0.14 Avail Cap(c_a), veh/h 186 1326 591 413 1379 615 413 949 746 186 0 890 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 31.9 26.3 27.2 29.9 23.2 22.4 30.6 11.2 11.6 30.8 0.0 11.3 Incr Delay (d2), s/veh 3.0 0.6 3.2 4.1 0.3 0.4 2.6 0.1 0.2 2.6 0.0 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 1.8 2.5 1.9 1.9 1.0 1.3 1.4 1.5 0.8 0.0 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 34.9 26.9 30.5 34.0 23.5 22.7 33.3 11.3 11.8 33.4 0.0 11.4 LnGrp LOS C C C C C C C B B C B
Approach Vol, veh/h 454 625 537 164
Approach Delay, s/veh 28.7 27.4 18.3 17.8
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.2 34.9 10.5 14.5 9.0 34.1 6.6 18.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 34.0 8.0 25.0 8.0 33.0 7.0 26.0 Max Q Clear Time (g_c+I1), s 3.7 7.4 6.4 8.7 5.1 4.6 2.9 7.0 Green Ext Time (p_c), s 0.0 1.6 0.1 1.8 0.1 0.5 0.0 1.8 Intersection Summary
HCM 7th Control Delay, s/veh 24.1
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 41 334 44 49 325 93 37 33 44 112 31 52 Future Volume (veh/h) 41 334 44 49 325 93 37 33 44 112 31 52 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 42 344 45 51 335 96 38 34 45 115 32 54 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 86 747 331 100 775 343 153 404 341 329 499 416 Arrive On Green 0.05 0.21 0.21 0.06 0.21 0.21 0.04 0.21 0.21 0.09 0.26 0.26 Sat Flow, veh/h 1810 3610 1598 1810 3610 1599 3510 1900 1603 3510 1900 1584 Grp Volume(v), veh/h 42 344 45 51 335 96 38 34 45 115 32 54 Grp Sat Flow(s),veh/h/ln 1810 1805 1598 1810 1805 1599 1755 1900 1603 1755 1900 1584 Q Serve(g_s), s 0.8 3.1 0.9 1.0 3.0 1.9 0.4 0.5 0.8 1.1 0.5 1.0 Cycle Q Clear(g_c), s 0.8 3.1 0.9 1.0 3.0 1.9 0.4 0.5 0.8 1.1 0.5 1.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 86 747 331 100 775 343 153 404 341 329 499 416 V/C Ratio(X) 0.49 0.46 0.14 0.51 0.43 0.28 0.25 0.08 0.13 0.35 0.06 0.13 Avail Cap(c_a), veh/h 293 2534 1122 293 2534 1122 474 1847 1558 569 1898 1582 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.2 12.9 12.0 17.0 12.6 12.2 17.1 11.7 11.8 15.7 10.2 10.4 Incr Delay (d2), s/veh 4.3 0.4 0.2 4.0 0.4 0.4 0.8 0.1 0.2 0.6 0.1 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.9 0.2 0.4 0.8 0.5 0.1 0.2 0.2 0.4 0.1 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.5 13.3 12.2 21.0 13.0 12.6 18.0 11.8 12.0 16.4 10.3 10.6 LnGrp LOS C B B C B B B B B B B B
Approach Vol, veh/h 431 482 117 201
Approach Delay, s/veh 14.0 13.7 13.9 13.8
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.5 11.9 6.0 11.7 5.6 13.7 5.8 11.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 36.0 6.0 26.0 5.0 37.0 6.0 26.0 Max Q Clear Time (g_c+I1), s 3.1 2.8 3.0 5.1 2.4 3.0 2.8 5.0 Green Ext Time (p_c), s 0.1 0.3 0.0 2.0 0.0 0.3 0.0 2.1 Intersection Summary
HCM 7th Control Delay, s/veh 13.9
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 39 136 205 96 227 143 443 1286 151 151 1027 64 Future Volume (veh/h) 39 136 205 96 227 143 443 1286 151 151 1027 64 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 40 139 209 98 232 146 452 1312 154 154 1048 65 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 143 667 297 237 1097 335 571 2077 636 272 1637 501 Arrive On Green 0.04 0.18 0.18 0.07 0.21 0.21 0.16 0.40 0.40 0.08 0.32 0.32 Sat Flow, veh/h 3510 3610 1608 3510 5187 1585 3510 5187 1589 3510 5187 1588 Grp Volume(v), veh/h 40 139 209 98 232 146 452 1312 154 154 1048 65 Grp Sat Flow(s),veh/h/ln 1755 1805 1608 1755 1729 1585 1755 1729 1589 1755 1729 1588 Q Serve(g_s), s 0.7 1.9 7.2 1.6 2.2 4.7 7.3 12.0 3.8 2.5 10.3 1.7 Cycle Q Clear(g_c), s 0.7 1.9 7.2 1.6 2.2 4.7 7.3 12.0 3.8 2.5 10.3 1.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 143 667 297 237 1097 335 571 2077 636 272 1637 501 V/C Ratio(X) 0.28 0.21 0.70 0.41 0.21 0.44 0.79 0.63 0.24 0.57 0.64 0.13 Avail Cap(c_a), veh/h 296 2008 894 355 2973 908 651 3060 937 296 2535 776 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.6 20.5 22.7 26.5 19.3 20.3 23.9 14.3 11.8 26.4 17.4 14.5 Incr Delay (d2), s/veh 1.1 0.2 3.0 1.2 0.1 0.9 5.9 0.3 0.2 2.1 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.7 2.6 0.6 0.8 1.6 3.1 3.6 1.1 1.0 3.3 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 28.7 20.7 25.7 27.7 19.4 21.2 29.8 14.6 12.0 28.5 17.8 14.6 LnGrp LOS C C C C B C C B B C B B
Approach Vol, veh/h 388 476 1918 1267
Approach Delay, s/veh 24.2 21.7 18.0 19.0
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.6 27.8 8.0 15.0 13.6 22.7 6.4 16.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 6.0 33.0 11.0 29.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 4.5 14.0 3.6 9.2 9.3 12.3 2.7 6.7 Green Ext Time (p_c), s 0.0 9.3 0.0 1.4 0.3 6.3 0.0 1.8 Intersection Summary
HCM 7th Control Delay, s/veh 19.3
HCM 7th LOS B
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 42 463 140 180 827 43 238 654 170 68 624 83 Future Volume (veh/h) 42 463 140 180 827 43 238 654 170 68 624 83 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 44 487 147 189 871 45 251 688 179 72 657 87 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 151 1079 480 295 1186 61 357 1066 472 203 1305 402 Arrive On Green 0.04 0.30 0.30 0.08 0.34 0.34 0.10 0.30 0.30 0.06 0.25 0.25 Sat Flow, veh/h 3510 3610 1607 3510 3492 180 3510 3610 1599 3510 5187 1597 Grp Volume(v), veh/h 44 487 147 189 450 466 251 688 179 72 657 87 Grp Sat Flow(s),veh/h/ln 1755 1805 1607 1755 1805 1867 1755 1805 1599 1755 1729 1597 Q Serve(g_s), s 0.7 6.6 4.3 3.2 13.3 13.3 4.2 10.1 5.4 1.2 6.6 2.6 Cycle Q Clear(g_c), s 0.7 6.6 4.3 3.2 13.3 13.3 4.2 10.1 5.4 1.2 6.6 2.6 Prop In Lane 1.00 1.00 1.00 0.10 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 151 1079 480 295 613 634 357 1066 472 203 1305 402 V/C Ratio(X) 0.29 0.45 0.31 0.64 0.73 0.73 0.70 0.65 0.38 0.35 0.50 0.22 Avail Cap(c_a), veh/h 289 1666 742 463 922 954 405 1964 870 289 2650 816 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.1 17.2 16.4 26.9 17.6 17.6 26.4 18.6 17.0 27.5 19.5 18.0 Incr Delay (d2), s/veh 1.0 0.3 0.4 2.3 1.7 1.7 4.6 0.7 0.5 1.0 0.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.4 1.4 1.3 5.0 5.1 1.7 3.4 1.8 0.5 2.2 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.2 17.5 16.8 29.2 19.3 19.3 31.0 19.3 17.5 28.5 19.8 18.2 LnGrp LOS C B B C B B C B B C B B
Approach Vol, veh/h 678 1105 1118 816
Approach Delay, s/veh 18.1 21.0 21.6 20.4
Approach LOS B C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.5 21.9 9.1 22.1 10.2 19.3 6.6 24.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 33.0 8.0 28.0 7.0 31.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 3.2 12.1 5.2 8.6 6.2 8.6 2.7 15.3 Green Ext Time (p_c), s 0.0 4.6 0.2 3.4 0.1 4.2 0.0 4.9 Intersection Summary
HCM 7th Control Delay, s/veh 20.5
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 123 498 130 175 699 87 336 903 197 149 745 115 Future Volume (veh/h) 123 498 130 175 699 87 336 903 197 149 745 115 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 128 519 135 182 728 91 350 941 205 155 776 120 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 250 1471 449 277 1510 455 457 1593 494 262 1304 404 Arrive On Green 0.07 0.28 0.28 0.08 0.29 0.29 0.13 0.31 0.31 0.07 0.25 0.25 Sat Flow, veh/h 3510 5187 1583 3510 5187 1562 3510 5187 1609 3510 5187 1608 Grp Volume(v), veh/h 128 519 135 182 728 91 350 941 205 155 776 120 Grp Sat Flow(s),veh/h/ln 1755 1729 1583 1755 1729 1562 1755 1729 1609 1755 1729 1608 Q Serve(g_s), s 2.2 5.0 4.2 3.1 7.2 2.7 6.0 9.6 6.3 2.7 8.2 3.8 Cycle Q Clear(g_c), s 2.2 5.0 4.2 3.1 7.2 2.7 6.0 9.6 6.3 2.7 8.2 3.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 250 1471 449 277 1510 455 457 1593 494 262 1304 404 V/C Ratio(X) 0.51 0.35 0.30 0.66 0.48 0.20 0.77 0.59 0.42 0.59 0.59 0.30 Avail Cap(c_a), veh/h 281 2572 785 281 2572 775 505 2904 901 449 2821 875 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.0 17.8 17.5 28.0 18.3 16.7 26.3 18.3 17.2 28.0 20.6 18.9 Incr Delay (d2), s/veh 1.6 0.1 0.4 5.4 0.2 0.2 6.3 0.4 0.6 2.1 0.4 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 1.7 1.3 1.4 2.4 0.8 2.6 3.1 2.0 1.1 2.8 1.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.6 18.0 17.9 33.4 18.5 16.9 32.6 18.7 17.8 30.1 21.0 19.3 LnGrp LOS C B B C B B C B B C C B
Approach Vol, veh/h 782 1001 1496 1051
Approach Delay, s/veh 19.9 21.1 21.8 22.2
Approach LOS B C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.7 23.2 8.9 21.7 12.1 19.7 8.5 22.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 35.0 5.0 31.0 9.0 34.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 4.7 11.6 5.1 7.0 8.0 10.2 4.2 9.2 Green Ext Time (p_c), s 0.1 6.7 0.0 3.7 0.1 5.2 0.0 4.8 Intersection Summary
HCM 7th Control Delay, s/veh 21.4
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/21/2025 Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 67 67 191 242 124 78 221 1196 181 24 1014 29 Future Volume (veh/h) 67 67 191 242 124 78 221 1196 181 24 1014 29 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 69 69 197 249 128 80 228 1233 187 25 1045 30 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 99 344 284 296 551 458 274 1735 263 51 1340 414 Arrive On Green 0.05 0.18 0.18 0.16 0.29 0.29 0.15 0.38 0.38 0.03 0.26 0.26 Sat Flow, veh/h 1810 1900 1571 1810 1900 1578 1810 4543 689 1810 5187 1604 Grp Volume(v), veh/h 69 69 197 249 128 80 228 939 481 25 1045 30 Grp Sat Flow(s),veh/h/ln 1810 1900 1571 1810 1900 1578 1810 1729 1774 1810 1729 1604 Q Serve(g_s), s 2.4 2.0 7.7 8.7 3.3 2.5 8.0 15.0 15.0 0.9 12.2 0.9 Cycle Q Clear(g_c), s 2.4 2.0 7.7 8.7 3.3 2.5 8.0 15.0 15.0 0.9 12.2 0.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.39 1.00 1.00
Lane Grp Cap(c), veh/h 99 344 284 296 551 458 274 1321 678 51 1340 414 V/C Ratio(X) 0.70 0.20 0.69 0.84 0.23 0.17 0.83 0.71 0.71 0.49 0.78 0.07 Avail Cap(c_a), veh/h 222 641 530 333 757 629 305 1325 680 139 1511 467 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.3 22.7 25.0 26.4 17.6 17.3 26.9 17.1 17.1 31.3 22.5 18.3 Incr Delay (d2), s/veh 8.5 0.3 3.0 15.8 0.2 0.2 16.1 1.8 3.4 7.3 2.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 0.8 2.8 4.6 1.3 0.8 4.2 5.0 5.4 0.4 4.4 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 38.8 23.0 28.0 42.3 17.8 17.5 43.0 18.9 20.5 38.6 24.9 18.4 LnGrp LOS D C C D B B D B C D C B
Approach Vol, veh/h 335 457 1648 1100
Approach Delay, s/veh 29.2 31.1 22.7 25.0
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 5.8 28.9 14.7 15.8 13.9 20.9 7.6 22.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 25.0 12.0 22.0 11.0 19.0 8.0 26.0 Max Q Clear Time (g_c+I1), s 2.9 17.0 10.7 9.7 10.0 14.2 4.4 5.3 Green Ext Time (p_c), s 0.0 4.8 0.1 0.7 0.1 2.6 0.0 0.8 Intersection Summary
HCM 7th Control Delay, s/veh 25.1
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 47 20 81 126 34 101 81 1447 91 80 1361 41 Future Volume (veh/h) 47 20 81 126 34 101 81 1447 91 80 1361 41 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 48 21 84 130 35 104 84 1492 94 82 1403 42 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 89 48 192 304 346 289 128 1871 578 126 1866 565 Arrive On Green 0.05 0.14 0.14 0.09 0.18 0.18 0.07 0.36 0.36 0.07 0.36 0.36 Sat Flow, veh/h 1810 332 1329 3510 1900 1589 1810 5187 1603 1810 5187 1570 Grp Volume(v), veh/h 48 0 105 130 35 104 84 1492 94 82 1403 42 Grp Sat Flow(s),veh/h/ln 1810 0 1661 1755 1900 1589 1810 1729 1603 1810 1729 1570 Q Serve(g_s), s 1.2 0.0 2.7 1.7 0.7 2.7 2.1 12.2 1.9 2.1 11.2 0.8 Cycle Q Clear(g_c), s 1.2 0.0 2.7 1.7 0.7 2.7 2.1 12.2 1.9 2.1 11.2 0.8 Prop In Lane 1.00 0.80 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 89 0 240 304 346 289 128 1871 578 126 1866 565 V/C Ratio(X) 0.54 0.00 0.44 0.43 0.10 0.36 0.66 0.80 0.16 0.65 0.75 0.07 Avail Cap(c_a), veh/h 191 0 913 371 1044 873 191 1974 610 191 1974 597 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.0 0.0 18.5 20.5 16.1 16.9 21.4 13.6 10.3 21.4 13.3 10.0 Incr Delay (d2), s/veh 4.9 0.0 1.2 1.0 0.1 0.8 5.6 2.3 0.1 5.5 1.6 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 0.9 0.6 0.3 0.9 0.9 3.5 0.5 0.9 3.1 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 26.9 0.0 19.7 21.4 16.3 17.7 27.0 15.8 10.4 27.0 14.9 10.0 LnGrp LOS C B C B B C B B C B B
Approach Vol, veh/h 153 269 1670 1527
Approach Delay, s/veh 22.0 19.3 16.1 15.4
Approach LOS C B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.3 21.1 8.1 10.8 7.3 21.0 6.3 12.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 18.0 5.0 26.0 5.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 4.1 14.2 3.7 4.7 4.1 13.2 3.2 4.7 Green Ext Time (p_c), s 0.0 2.8 0.0 0.5 0.0 3.3 0.0 0.4 Intersection Summary
HCM 7th Control Delay, s/veh 16.3
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 256 0 155 0 0 0 296 1448 0 0 1334 252 Future Volume (veh/h) 256 0 155 0 0 0 296 1448 0 0 1334 252 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 261 0 158 0 0 0 302 1478 0 0 1361 257 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 890 0 266 0 314 0 365 3436 0 0 1941 603
Arrive On Green 0.17 0.00 0.17 0.00 0.00 0.00 0.20 0.66 0.00 0.00 0.37 0.37 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 261 0 158 0 0 0 302 1478 0 0 1361 257 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 3.1 0.0 4.2 0.0 0.0 0.0 7.4 6.2 0.0 0.0 10.3 5.5 Cycle Q Clear(g_c), s 3.1 0.0 4.2 0.0 0.0 0.0 7.4 6.2 0.0 0.0 10.3 5.5 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 890 0 266 0 314 0 365 3436 0 0 1941 603 V/C Ratio(X) 0.29 0.00 0.59 0.00 0.00 0.00 0.83 0.43 0.00 0.00 0.70 0.43 Avail Cap(c_a), veh/h 1974 0 763 0 900 0 429 3911 0 0 2235 694 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 17.5 0.0 17.9 0.0 0.0 0.0 17.7 3.7 0.0 0.0 12.3 10.8 Incr Delay (d2), s/veh 0.2 0.0 2.1 0.0 0.0 0.0 11.0 0.1 0.0 0.0 0.8 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.0 1.4 0.0 0.0 0.0 3.4 0.3 0.0 0.0 2.6 1.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.7 0.0 20.0 0.0 0.0 0.0 28.8 3.8 0.0 0.0 13.2 11.3 LnGrp LOS B C C A B B
Approach Vol, veh/h 419 0 1780 1618
Approach Delay, s/veh 18.6 0.0 8.0 12.9
Approach LOS B A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 34.8 11.7 13.4 21.4 11.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 35.0 22.0 11.0 20.0 22.0
Max Q Clear Time (g_c+I1), s 8.2 6.2 9.4 12.3 0.0
Green Ext Time (p_c), s 10.9 1.5 0.1 5.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 11.2
HCM 7th LOS B
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Jet Way 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 89 75 1847 107 14 1785
Future Volume (veh/h) 89 75 1847 107 14 1785
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 96 81 1986 115 15 1919
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 183 162 2986 927 48 3598
Arrive On Green 0.10 0.10 0.58 0.58 0.03 0.69
Sat Flow, veh/h 1810 1610 5358 1610 1810 5358
Grp Volume(v), veh/h 96 81 1986 115 15 1919
Grp Sat Flow(s),veh/h/ln 1810 1610 1729 1610 1810 1729
Q Serve(g_s), s 2.2 2.1 11.5 1.4 0.4 7.9
Cycle Q Clear(g_c), s 2.2 2.1 11.5 1.4 0.4 7.9
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 183 162 2986 927 48 3598
V/C Ratio(X) 0.53 0.50 0.66 0.12 0.31 0.53
Avail Cap(c_a), veh/h 1032 919 3552 1102 289 4854
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 18.7 18.6 6.4 4.2 20.9 3.3
Incr Delay (d2), s/veh 2.3 2.4 0.4 0.1 3.6 0.1
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.9 0.8 1.3 0.3 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.0 21.0 6.8 4.3 24.5 3.4
LnGrp LOS C C A A C A
Approach Vol, veh/h 177 2101 1934
Approach Delay, s/veh 21.0 6.6 3.5
Approach LOS C A A
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 5.2 29.2 34.4 9.4
Change Period (Y+Rc), s 4.0 4.0 4.0 5.0
Max Green Setting (Gmax), s 7.0 30.0 41.0 25.0
Max Q Clear Time (g_c+I1), s 2.4 13.5 9.9 4.2
Green Ext Time (p_c), s 0.0 11.7 16.6 0.5
Intersection Summary
HCM 7th Control Delay, s/veh 5.8
HCM 7th LOS A
h 7 1 7 " 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 259 166 0 1870 1771 656
Future Volume (veh/h) 259 166 0 1870 1771 656
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 287 144 0 1908 1807 0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 605 269 0 3321 3321
Arrive On Green 0.17 0.17 0.00 0.64 0.64 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 287 144 0 1908 1807 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 3.0 3.4 0.0 8.7 8.0 0.0
Cycle Q Clear(g_c), s 3.0 3.4 0.0 8.7 8.0 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 605 269 0 3321 3321
V/C Ratio(X) 0.47 0.53 0.00 0.57 0.54
Avail Cap(c_a), veh/h 1045 465 0 4992 4992
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 15.7 15.8 0.0 4.3 4.1 0.0
Incr Delay (d2), s/veh 0.6 1.6 0.0 0.2 0.1 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.1 1.2 0.0 0.2 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 16.2 17.5 0.0 4.4 4.3 0.0
LnGrp LOS B B A A
Approach Vol, veh/h 431 1908 1807
Approach Delay, s/veh 16.6 4.4 4.3
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 30.6 11.0 30.6
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 40.0 12.0 40.0
Max Q Clear Time (g_c+I1), s 10.7 5.4 10.0
Green Ext Time (p_c), s 15.9 0.9 15.0
Intersection Summary
HCM 7th Control Delay, s/veh 5.6
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 905 0 242 0 1630 397 205 1714 0 Future Volume (veh/h) 0 0 0 905 0 242 0 1630 397 205 1714 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 943 0 252 0 1698 414 214 1785 0 Peak Hour Factor 0.95 0.95 0.95 0.96 0.95 0.96 0.95 0.96 0.96 0.96 0.96 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 3 0 1110 0 988 0 2153 1154 287 2917 0
Arrive On Green 0.00 0.00 0.00 0.31 0.00 0.31 0.00 0.42 0.42 0.08 0.56 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 943 0 252 0 1698 414 214 1785 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 14.9 0.0 3.6 0.0 17.4 6.0 3.6 14.0 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 14.9 0.0 3.6 0.0 17.4 6.0 3.6 14.0 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 3 0 1110 0 988 0 2153 1154 287 2917 0 V/C Ratio(X) 0.00 0.00 0.00 0.85 0.00 0.26 0.00 0.79 0.36 0.75 0.61 0.00 Avail Cap(c_a), veh/h 0 153 0 1303 0 1634 0 2292 1196 287 3056 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 19.9 0.0 15.9 0.0 15.5 3.2 27.4 8.9 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 4.8 0.0 0.1 0.0 1.8 0.2 10.1 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 6.0 0.0 1.1 0.0 5.3 0.7 1.7 3.2 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 24.7 0.0 16.1 0.0 17.4 3.4 37.5 9.3 0.0 LnGrp LOS C B B A D A
Approach Vol, veh/h 0 1195 2112 1999
Approach Delay, s/veh 0.0 22.9 14.6 12.3
Approach LOS C B B
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 9.0 29.4 22.7 0.0 38.4 22.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 27.0 22.0 5.0 36.0 31.0 Max Q Clear Time (g_c+I1), s 5.6 19.4 16.9 0.0 16.0 5.6 Green Ext Time (p_c), s 0.0 6.0 1.8 0.0 11.7 0.9
Intersection Summary
HCM 7th Control Delay, s/veh 15.6
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/21/2025 Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 309 531 155 306 672 370 159 1152 215 309 1743 301 Future Volume (veh/h) 309 531 155 306 672 370 159 1152 215 309 1743 301 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 329 565 165 326 715 394 169 1226 229 329 1854 320 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 351 1438 441 403 1514 464 244 1472 275 396 1964 610 Arrive On Green 0.10 0.28 0.28 0.11 0.29 0.29 0.07 0.34 0.34 0.11 0.38 0.38 Sat Flow, veh/h 3510 5187 1590 3510 5187 1588 3510 4390 820 3510 5187 1610 Grp Volume(v), veh/h 329 565 165 326 715 394 169 966 489 329 1854 320 Grp Sat Flow(s),veh/h/ln 1755 1729 1590 1755 1729 1588 1755 1729 1752 1755 1729 1610 Q Serve(g_s), s 9.3 8.8 8.4 9.1 11.3 23.4 4.7 25.8 25.8 9.2 34.6 15.4 Cycle Q Clear(g_c), s 9.3 8.8 8.4 9.1 11.3 23.4 4.7 25.8 25.8 9.2 34.6 15.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.47 1.00 1.00
Lane Grp Cap(c), veh/h 351 1438 441 403 1514 464 244 1159 587 396 1964 610 V/C Ratio(X) 0.94 0.39 0.37 0.81 0.47 0.85 0.69 0.83 0.83 0.83 0.94 0.52 Avail Cap(c_a), veh/h 351 1505 461 527 1764 540 246 1159 587 421 1972 612 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 44.7 29.3 29.1 43.2 29.1 33.3 45.5 30.7 30.7 43.4 30.0 24.1 Incr Delay (d2), s/veh 32.2 0.2 0.5 7.0 0.2 10.9 8.1 5.3 10.0 12.6 10.0 0.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.5 3.5 3.1 4.2 4.5 9.8 2.2 10.5 11.4 4.4 14.6 5.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 76.9 29.5 29.7 50.2 29.3 44.2 53.6 36.0 40.6 56.0 40.1 24.9 LnGrp LOS E C C D C D D D D E D C
Approach Vol, veh/h 1059 1435 1624 2503
Approach Delay, s/veh 44.2 38.1 39.2 40.2
Approach LOS D D D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 15.3 37.5 15.5 31.7 10.9 41.8 14.0 33.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 12.0 33.0 15.0 29.0 7.0 38.0 10.0 34.0 Max Q Clear Time (g_c+I1), s 11.2 27.8 11.1 10.8 6.7 36.6 11.3 25.4 Green Ext Time (p_c), s 0.1 3.5 0.4 3.8 0.0 1.3 0.0 3.8 Intersection Summary
HCM 7th Control Delay, s/veh 40.2
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 143 0 153 0 0 0 205 1131 0 0 1016 145 Future Volume (veh/h) 143 0 153 0 0 0 205 1131 0 0 1016 145 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 151 0 161 0 0 0 216 1191 0 0 1069 153 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 534 0 0 0 5 0 433 3239 0 0 2019 618
Arrive On Green 0.15 0.00 0.00 0.00 0.00 0.00 0.12 0.62 0.00 0.00 0.39 0.39 Sat Flow, veh/h 3510 151 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 151 13.7 0 0 0 216 1191 0 0 1069 153 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 1.4 0.0 0.0 0.0 2.1 4.0 0.0 0.0 5.7 2.3 Cycle Q Clear(g_c), s 1.4 0.0 0.0 0.0 2.1 4.0 0.0 0.0 5.7 2.3 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 534 0 5 0 433 3239 0 0 2019 618
V/C Ratio(X) 0.28 0.00 0.00 0.00 0.50 0.37 0.00 0.00 0.53 0.25 Avail Cap(c_a), veh/h 2747 0 1540 0 491 4493 0 0 3189 977 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 13.4 0.0 0.0 0.0 14.7 3.3 0.0 0.0 8.4 7.4 Incr Delay (d2), s/veh 0.3 0.0 0.0 0.0 0.9 0.1 0.0 0.0 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 0.0 0.0 0.6 0.0 0.0 0.0 1.1 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.7 0.0 0.0 0.0 15.5 3.3 0.0 0.0 8.6 7.6 LnGrp LOS B B A A A
Approach Vol, veh/h 0 1407 1222
Approach Delay, s/veh 0.0 5.2 8.5
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 26.3 8.4 17.9 9.4 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 6.0 4.1 7.7 3.4 0.0
Green Ext Time (p_c), s 8.3 0.1 6.2 0.4 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.1
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 151 520 178 239 827 294 197 910 214 217 805 109 Future Volume (veh/h) 151 520 178 239 827 294 197 910 214 217 805 109 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 154 531 182 244 844 300 201 929 218 221 821 111 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 237 1484 451 286 1557 474 294 1457 445 471 1719 526 Arrive On Green 0.07 0.29 0.29 0.08 0.30 0.30 0.08 0.28 0.28 0.13 0.33 0.33 Sat Flow, veh/h 3510 5187 1576 3510 5187 1578 3510 5187 1586 3510 5187 1587 Grp Volume(v), veh/h 154 531 182 244 844 300 201 929 218 221 821 111 Grp Sat Flow(s),veh/h/ln 1755 1729 1576 1755 1729 1578 1755 1729 1586 1755 1729 1587 Q Serve(g_s), s 3.2 6.0 6.9 5.1 10.0 12.1 4.1 11.6 8.4 4.3 9.3 3.7 Cycle Q Clear(g_c), s 3.2 6.0 6.9 5.1 10.0 12.1 4.1 11.6 8.4 4.3 9.3 3.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 237 1484 451 286 1557 474 294 1457 445 471 1719 526 V/C Ratio(X) 0.65 0.36 0.40 0.85 0.54 0.63 0.68 0.64 0.49 0.47 0.48 0.21 Avail Cap(c_a), veh/h 286 2395 728 286 2395 728 429 2395 732 477 2465 754 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.5 20.9 21.2 33.4 21.5 22.3 32.8 23.2 22.1 29.5 19.6 17.7 Incr Delay (d2), s/veh 3.8 0.1 0.6 21.3 0.3 1.4 2.8 0.5 0.8 0.7 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 2.2 2.3 2.8 3.7 4.2 1.7 4.2 2.9 1.7 3.2 1.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 37.3 21.1 21.8 54.7 21.8 23.7 35.6 23.7 22.9 30.2 19.8 17.9 LnGrp LOS D C C D C C D C C C B B
Approach Vol, veh/h 867 1388 1348 1153
Approach Delay, s/veh 24.1 28.0 25.3 21.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.9 24.7 10.0 25.1 10.2 28.4 9.0 26.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 34.0 6.0 34.0 9.0 35.0 6.0 34.0 Max Q Clear Time (g_c+I1), s 6.3 13.6 7.1 8.9 6.1 11.3 5.2 14.1 Green Ext Time (p_c), s 0.2 6.6 0.0 4.0 0.2 5.6 0.0 6.4 Intersection Summary
HCM 7th Control Delay, s/veh 25.0
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/21/2025
Year 2027 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 38 77 199 83 123 49 173 1276 84 30 1118 62 Future Volume (veh/h) 38 77 199 83 123 49 173 1276 84 30 1118 62 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 40 80 207 86 128 51 180 1329 88 31 1165 65 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 73 329 279 113 372 310 224 2270 690 61 1800 546 Arrive On Green 0.04 0.17 0.17 0.06 0.20 0.20 0.12 0.44 0.44 0.03 0.35 0.35 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 40 80 207 86 128 51 180 1329 88 31 1165 65 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 1.3 2.2 7.5 2.9 3.6 1.6 5.9 11.9 2.0 1.0 11.6 1.7 Cycle Q Clear(g_c), s 1.3 2.2 7.5 2.9 3.6 1.6 5.9 11.9 2.0 1.0 11.6 1.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 73 329 279 113 372 310 224 2270 690 61 1800 546 V/C Ratio(X) 0.55 0.24 0.74 0.76 0.34 0.16 0.80 0.59 0.13 0.51 0.65 0.12 Avail Cap(c_a), veh/h 177 1206 1022 147 1175 982 265 3124 949 177 2871 872 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.9 21.9 24.1 28.3 21.3 20.5 26.2 13.1 10.3 29.2 16.9 13.7 Incr Delay (d2), s/veh 6.3 0.4 3.9 15.2 0.5 0.2 13.9 0.2 0.1 6.6 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 1.0 3.0 1.7 1.5 0.6 3.1 3.5 0.6 0.5 3.8 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.2 22.3 28.0 43.6 21.9 20.8 40.1 13.3 10.4 35.8 17.3 13.8 LnGrp LOS D C C D C C D B B D B B
Approach Vol, veh/h 327 265 1597 1261
Approach Delay, s/veh 27.5 28.7 16.2 17.6
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.1 30.9 7.8 16.6 11.6 25.3 6.5 18.0 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 37.0 5.0 39.0 9.0 34.0 6.0 38.0 Max Q Clear Time (g_c+I1), s 3.0 13.9 4.9 9.5 7.9 13.6 3.3 5.6 Green Ext Time (p_c), s 0.0 9.6 0.0 1.1 0.0 7.7 0.0 0.9 Intersection Summary
HCM 7th Control Delay, s/veh 18.7
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
Appendix D. Year 2027 With Project Phase I
Peak Hour Analysis Worksheets
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 36 1155 31 2 828 38 8 4 0 33 12 33 Future Volume (veh/h) 36 1155 31 2 828 38 8 4 0 33 12 33 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 38 1216 33 2 872 40 8 4 0 35 13 35 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.96 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 81 2102 57 6 1843 84 379 154 0 256 110 150
Arrive On Green 0.04 0.40 0.40 0.00 0.36 0.36 0.22 0.22 0.00 0.22 0.22 0.22 Sat Flow, veh/h 1810 5191 141 1810 5077 232 878 705 0 440 505 689 Grp Volume(v), veh/h 38 810 439 2 593 319 12 0 0 83 0 0 Grp Sat Flow(s),veh/h/ln 1810 1729 1874 1810 1729 1851 1583 0 0 1633 0 0 Q Serve(g_s), s 0.7 5.8 5.8 0.0 4.2 4.3 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.7 5.8 5.8 0.0 4.2 4.3 0.2 0.0 0.0 1.2 0.0 0.0 Prop In Lane 1.00 0.08 1.00 0.13 0.67 0.00 0.42 0.42
Lane Grp Cap(c), veh/h 81 1400 759 6 1255 672 532 0 0 516 0 0 V/C Ratio(X) 0.47 0.58 0.58 0.35 0.47 0.47 0.02 0.00 0.00 0.16 0.00 0.00 Avail Cap(c_a), veh/h 282 1940 1052 282 1940 1039 1384 0 0 1395 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 14.9 7.4 7.4 16.0 7.9 7.9 9.9 0.0 0.0 10.3 0.0 0.0 Incr Delay (d2), s/veh 4.2 0.4 0.7 33.9 0.3 0.5 0.0 0.0 0.0 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.9 1.0 0.1 0.7 0.8 0.0 0.0 0.0 0.4 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 19.1 7.8 8.1 49.9 8.1 8.4 9.9 0.0 0.0 10.4 0.0 0.0 LnGrp LOS B A A D A A A B
Approach Vol, veh/h 1287 914 12 83
Approach Delay, s/veh 8.2 8.3 9.9 10.4
Approach LOS A A A B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.1 17.0 11.0 5.4 15.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.2 2.0 7.8 3.2 2.7 6.3
Green Ext Time (p_c), s 0.0 0.0 5.2 0.3 0.0 4.1
Intersection Summary
HCM 7th Control Delay, s/veh 8.4
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/28/2025
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 242 738 400 139 657 152 289 1289 258 188 1167 162 Future Volume (veh/h) 242 738 400 139 657 152 289 1289 258 188 1167 162 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 281 858 465 162 764 177 336 1499 300 219 1357 188 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 323 1633 500 221 1482 583 355 1727 637 280 1615 649 Arrive On Green 0.10 0.34 0.34 0.07 0.30 0.30 0.11 0.36 0.36 0.08 0.33 0.33 Sat Flow, veh/h 3291 4863 1491 3291 4863 1490 3291 4863 1508 3291 4863 1508 Grp Volume(v), veh/h 281 858 465 162 764 177 336 1499 300 219 1357 188 Grp Sat Flow(s),veh/h/ln 1646 1621 1491 1646 1621 1490 1646 1621 1508 1646 1621 1508 Q Serve(g_s), s 8.6 14.5 30.7 4.9 13.2 8.4 10.3 29.3 14.6 6.6 26.3 8.3 Cycle Q Clear(g_c), s 8.6 14.5 30.7 4.9 13.2 8.4 10.3 29.3 14.6 6.6 26.3 8.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 323 1633 500 221 1482 583 355 1727 637 280 1615 649 V/C Ratio(X) 0.87 0.53 0.93 0.73 0.52 0.30 0.95 0.87 0.47 0.78 0.84 0.29 Avail Cap(c_a), veh/h 323 1671 512 226 1527 596 355 1814 664 291 1718 681 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 45.3 27.3 32.7 46.6 29.2 21.5 45.1 30.6 21.2 45.7 31.5 18.9 Incr Delay (d2), s/veh 21.6 0.3 23.3 11.3 0.3 0.3 33.8 4.6 0.5 12.6 3.7 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.3 5.3 13.4 2.3 4.8 2.8 5.6 11.1 4.8 3.1 9.9 2.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 67.0 27.6 56.0 57.9 29.5 21.8 79.0 35.3 21.8 58.3 35.3 19.1 LnGrp LOS E C E E C C E D C E D B
Approach Vol, veh/h 1604 1103 2135 1764
Approach Delay, s/veh 42.7 32.4 40.2 36.4
Approach LOS D C D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 12.7 40.2 10.9 38.2 15.0 37.8 14.0 35.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 9.0 38.0 7.0 35.0 11.0 36.0 10.0 32.0 Max Q Clear Time (g_c+I1), s 8.6 31.3 6.9 32.7 12.3 28.3 10.6 15.2 Green Ext Time (p_c), s 0.0 4.9 0.0 1.5 0.0 4.9 0.0 4.9 Intersection Summary
HCM 7th Control Delay, s/veh 38.5
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Project Dwy D/NW Promenade & Rosedale Highway 12/27/2025 Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 67 1331 64 80 808 61 96 6 36 86 6 50 Future Volume (veh/h) 67 1331 64 80 808 61 96 6 36 86 6 50 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1870 1870 1900 1900 1870 1870 1870 1900 1870 1900 Adj Flow Rate, veh/h 74 1463 67 84 888 67 101 6 38 99 0 55 Peak Hour Factor 0.91 0.91 0.95 0.95 0.91 0.91 0.95 0.95 0.95 0.91 0.95 0.91 Percent Heavy Veh, % 0 0 2 2 0 0 2 2 2 0 2 0
Cap, veh/h 224 1768 540 122 1792 556 166 10 62 499 0 222 Arrive On Green 0.06 0.34 0.34 0.07 0.35 0.35 0.14 0.14 0.14 0.14 0.00 0.14 Sat Flow, veh/h 3510 5187 1583 1781 5187 1609 1204 72 453 3619 0 1610 Grp Volume(v), veh/h 74 1463 67 84 888 67 145 0 0 99 0 55 Grp Sat Flow(s),veh/h/ln 1755 1729 1583 1781 1729 1609 1729 0 0 1810 0 1610 Q Serve(g_s), s 1.0 13.1 1.5 2.3 6.9 1.4 4.0 0.0 0.0 1.2 0.0 1.5 Cycle Q Clear(g_c), s 1.0 13.1 1.5 2.3 6.9 1.4 4.0 0.0 0.0 1.2 0.0 1.5 Prop In Lane 1.00 1.00 1.00 1.00 0.70 0.26 1.00 1.00
Lane Grp Cap(c), veh/h 224 1768 540 122 1792 556 238 0 0 499 0 222 V/C Ratio(X) 0.33 0.83 0.12 0.69 0.50 0.12 0.61 0.00 0.00 0.20 0.00 0.25 Avail Cap(c_a), veh/h 346 1839 561 175 1839 570 613 0 0 1283 0 571 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 22.7 15.4 11.5 23.1 13.1 11.4 20.6 0.0 0.0 19.4 0.0 19.5 Incr Delay (d2), s/veh 0.9 3.2 0.1 6.8 0.2 0.1 2.5 0.0 0.0 0.2 0.0 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 4.3 0.4 1.1 2.0 0.4 1.6 0.0 0.0 0.5 0.0 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 23.6 18.6 11.6 29.9 13.3 11.4 23.1 0.0 0.0 19.6 0.0 20.1 LnGrp LOS C B B C B B C B C
Approach Vol, veh/h 1604 1039 145 154
Approach Delay, s/veh 18.5 14.6 23.1 19.8
Approach LOS B B C B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 7.5 21.3 11.0 7.2 21.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 18.0 5.0 18.0 18.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 6.0 4.3 15.1 3.5 3.0 8.9
Green Ext Time (p_c), s 0.5 0.0 2.2 0.4 0.0 3.8
Intersection Summary
HCM 7th Control Delay, s/veh 17.4
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. " +++ 7 h 1 7 4 h 4 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 120 1199 90 14 806 90 82 41 48 223 45 112 Future Volume (veh/h) 120 1199 90 14 806 90 82 41 48 223 45 112 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 135 1347 101 16 906 101 92 46 54 251 51 126 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 297 2112 656 36 1776 551 253 506 224 395 652 285 Arrive On Green 0.08 0.41 0.41 0.02 0.34 0.34 0.07 0.14 0.14 0.11 0.18 0.18 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1600 3510 3610 1579 Grp Volume(v), veh/h 135 1347 101 16 906 101 92 46 54 251 51 126 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1600 1755 1805 1579 Q Serve(g_s), s 1.8 10.4 2.0 0.4 7.0 2.2 1.2 0.6 1.5 3.4 0.6 3.6 Cycle Q Clear(g_c), s 1.8 10.4 2.0 0.4 7.0 2.2 1.2 0.6 1.5 3.4 0.6 3.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 297 2112 656 36 1776 551 253 506 224 395 652 285 V/C Ratio(X) 0.45 0.64 0.15 0.44 0.51 0.18 0.36 0.09 0.24 0.63 0.08 0.44 Avail Cap(c_a), veh/h 492 2907 902 181 2699 838 351 2168 961 773 2601 1138 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.8 11.9 9.4 24.2 13.1 11.5 22.1 18.7 19.1 21.2 17.0 18.2 Incr Delay (d2), s/veh 1.1 0.3 0.1 8.3 0.2 0.2 0.9 0.1 0.5 1.7 0.1 1.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 2.8 0.5 0.2 2.0 0.6 0.5 0.2 0.5 1.3 0.2 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 22.8 12.2 9.5 32.5 13.3 11.7 23.0 18.8 19.7 22.9 17.1 19.3 LnGrp LOS C B A C B B C B B C B B
Approach Vol, veh/h 1583 1023 192 428
Approach Delay, s/veh 12.9 13.5 21.0 21.1
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.6 11.0 5.0 24.3 7.6 13.0 8.2 21.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 30.0 5.0 28.0 5.0 36.0 7.0 26.0 Max Q Clear Time (g_c+I1), s 5.4 3.5 2.4 12.4 3.2 5.6 3.8 9.0 Green Ext Time (p_c), s 0.4 0.4 0.0 8.0 0.0 0.7 0.1 5.5 Intersection Summary
HCM 7th Control Delay, s/veh 14.7
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 126 526 161 327 780 132 242 668 240 116 946 254 Future Volume (veh/h) 126 526 161 327 780 132 242 668 240 116 946 254 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 138 578 177 359 857 145 266 734 264 127 1040 279 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 211 1034 320 383 1288 399 298 2001 621 199 1291 568 Arrive On Green 0.06 0.21 0.21 0.12 0.26 0.26 0.09 0.41 0.41 0.06 0.38 0.38 Sat Flow, veh/h 3319 4904 1518 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 138 578 177 359 857 145 266 734 264 127 1040 279 Grp Sat Flow(s),veh/h/ln 1659 1635 1518 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 3.2 8.2 8.1 8.4 12.2 6.1 6.2 8.1 9.7 2.9 21.2 11.0 Cycle Q Clear(g_c), s 3.2 8.2 8.1 8.4 12.2 6.1 6.2 8.1 9.7 2.9 21.2 11.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 211 1034 320 383 1288 399 298 2001 621 199 1291 568 V/C Ratio(X) 0.65 0.56 0.55 0.94 0.67 0.36 0.89 0.37 0.43 0.64 0.81 0.49 Avail Cap(c_a), veh/h 298 2014 623 383 2140 663 298 2203 683 341 1577 694 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.6 27.5 27.5 34.2 25.7 23.4 35.1 16.0 16.5 35.8 21.7 18.5 Incr Delay (d2), s/veh 3.4 0.5 1.5 30.3 0.6 0.6 26.7 0.1 0.5 3.3 2.6 0.7 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 2.9 2.8 4.7 4.3 2.0 3.4 2.6 0.1 1.2 7.7 3.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 39.0 28.0 29.0 64.4 26.3 24.0 61.8 16.2 17.0 39.1 24.3 19.1 LnGrp LOS D C C E C C E B B D C B
Approach Vol, veh/h 893 1361 1264 1446
Approach Delay, s/veh 29.9 36.1 25.9 24.6
Approach LOS C D C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.7 35.8 13.0 20.4 11.0 33.5 9.0 24.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 35.0 9.0 32.0 7.0 36.0 7.0 34.0 Max Q Clear Time (g_c+I1), s 4.9 10.1 10.4 10.2 8.2 23.2 5.2 14.2 Green Ext Time (p_c), s 0.1 3.3 0.0 4.1 0.0 6.1 0.1 5.7 Intersection Summary
HCM 7th Control Delay, s/veh 29.0
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 80 711 20 28 536 101 52 28 41 351 77 99 Future Volume (veh/h) 80 711 20 28 536 101 52 28 41 351 77 99 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 85 756 21 30 570 107 55 30 44 373 82 105 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 123 1362 420 61 824 364 96 286 241 440 647 547 Arrive On Green 0.07 0.26 0.26 0.03 0.23 0.23 0.05 0.15 0.15 0.24 0.34 0.34 Sat Flow, veh/h 1810 5187 1598 1810 3610 1596 1810 1900 1601 1810 1900 1606 Grp Volume(v), veh/h 85 756 21 30 570 107 55 30 44 373 82 105 Grp Sat Flow(s),veh/h/ln 1810 1729 1598 1810 1805 1596 1810 1900 1601 1810 1900 1606 Q Serve(g_s), s 2.4 6.5 0.5 0.8 7.5 2.9 1.5 0.7 1.2 10.1 1.5 2.4 Cycle Q Clear(g_c), s 2.4 6.5 0.5 0.8 7.5 2.9 1.5 0.7 1.2 10.1 1.5 2.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 123 1362 420 61 824 364 96 286 241 440 647 547 V/C Ratio(X) 0.69 0.55 0.05 0.49 0.69 0.29 0.58 0.10 0.18 0.85 0.13 0.19 Avail Cap(c_a), veh/h 175 1809 557 175 1259 557 210 920 775 561 1288 1089 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 23.5 16.4 14.2 24.5 18.3 16.5 23.9 18.9 19.1 18.6 11.7 12.0 Incr Delay (d2), s/veh 6.6 0.4 0.0 5.9 1.1 0.4 5.4 0.2 0.4 9.6 0.1 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 2.0 0.1 0.4 2.6 0.9 0.7 0.3 0.4 4.8 0.6 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.2 16.8 14.3 30.4 19.3 16.9 29.2 19.1 19.5 28.2 11.8 12.2 LnGrp LOS C B B C B B C B B C B B
Approach Vol, veh/h 862 707 129 560
Approach Delay, s/veh 18.0 19.4 23.6 22.8
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 16.5 11.8 5.7 17.6 6.7 21.6 7.5 15.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 16.0 25.0 5.0 18.0 6.0 35.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 12.1 3.2 2.8 8.5 3.5 4.4 4.4 9.5 Green Ext Time (p_c), s 0.5 0.2 0.0 3.2 0.0 0.8 0.0 1.9 Intersection Summary
HCM 7th Control Delay, s/veh 20.0
HCM 7th LOS B
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 23 646 242 113 455 21 125 26 180 40 55 14 Future Volume (veh/h) 23 646 242 113 455 21 125 26 180 40 55 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 26 743 278 130 523 24 144 30 207 46 63 16 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 56 1047 452 167 1269 561 184 413 349 88 312 260 Arrive On Green 0.03 0.29 0.29 0.09 0.35 0.35 0.10 0.22 0.22 0.05 0.16 0.16 Sat Flow, veh/h 1810 3610 1558 1810 3610 1596 1810 1900 1606 1810 1900 1583 Grp Volume(v), veh/h 26 743 278 130 523 24 144 30 207 46 63 16 Grp Sat Flow(s),veh/h/ln 1810 1805 1558 1810 1805 1596 1810 1900 1606 1810 1900 1583 Q Serve(g_s), s 0.6 8.4 7.0 3.2 5.0 0.5 3.5 0.6 5.3 1.1 1.3 0.4 Cycle Q Clear(g_c), s 0.6 8.4 7.0 3.2 5.0 0.5 3.5 0.6 5.3 1.1 1.3 0.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 56 1047 452 167 1269 561 184 413 349 88 312 260 V/C Ratio(X) 0.47 0.71 0.62 0.78 0.41 0.04 0.78 0.07 0.59 0.52 0.20 0.06 Avail Cap(c_a), veh/h 199 1509 651 199 1509 667 199 1003 848 239 1045 870 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.7 14.4 13.9 20.2 11.2 9.7 19.9 14.1 16.0 21.1 16.4 16.0 Incr Delay (d2), s/veh 6.0 0.9 1.4 15.1 0.2 0.0 16.8 0.1 1.6 4.8 0.3 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.5 1.9 1.8 1.4 0.1 2.1 0.2 1.6 0.5 0.5 0.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.6 15.3 15.3 35.3 11.4 9.7 36.8 14.2 17.6 25.9 16.7 16.1 LnGrp LOS C B B D B A D B B C B B
Approach Vol, veh/h 1047 677 381 125
Approach Delay, s/veh 15.6 15.9 24.6 20.0
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.2 13.9 8.2 17.2 8.6 11.5 5.4 20.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 24.0 5.0 19.0 5.0 25.0 5.0 19.0 Max Q Clear Time (g_c+I1), s 3.1 7.3 5.2 10.4 5.5 3.3 2.6 7.0 Green Ext Time (p_c), s 0.0 0.7 0.0 2.4 0.0 0.3 0.0 2.3 Intersection Summary
HCM 7th Control Delay, s/veh 17.5
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 296 0 574 428 441 444 303 1193 2 2 1505 221 Future Volume (veh/h) 296 0 574 428 441 444 303 1193 2 2 1505 221 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 361 0 700 594 438 541 370 1455 2 2 1835 270 Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 555 0 493 847 445 753 368 2405 3 5 1801 559
Arrive On Green 0.16 0.00 0.16 0.24 0.24 0.24 0.11 0.46 0.46 0.00 0.36 0.36 Sat Flow, veh/h 3506 0 3114 3506 1841 3116 3401 5182 7 1753 5025 1559 Grp Volume(v), veh/h 361 0 700 594 438 541 370 941 516 2 1835 270 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1839 1753 1675 1559 Q Serve(g_s), s 11.6 0.0 19.0 18.6 28.4 19.1 13.0 25.1 25.1 0.1 43.0 16.1 Cycle Q Clear(g_c), s 11.6 0.0 19.0 18.6 28.4 19.1 13.0 25.1 25.1 0.1 43.0 16.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 555 0 493 847 445 753 368 1554 853 5 1801 559 V/C Ratio(X) 0.65 0.00 1.42 0.70 0.98 0.72 1.00 0.61 0.61 0.42 1.02 0.48 Avail Cap(c_a), veh/h 555 0 493 847 445 753 368 1554 853 73 1801 559 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 47.4 0.0 50.5 41.5 45.3 41.8 53.5 24.0 24.0 59.7 38.5 29.9 Incr Delay (d2), s/veh 2.7 0.0 200.5 2.6 38.5 3.3 48.0 0.7 1.2 50.9 26.1 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.1 0.0 20.8 8.0 17.1 7.4 7.8 9.2 10.2 0.1 20.6 5.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 50.1 0.0 251.0 44.1 83.8 45.1 101.5 24.6 25.2 110.6 64.6 30.5 LnGrp LOS D F D F D F C C F F C
Approach Vol, veh/h 1061 1573 1827 2107
Approach Delay, s/veh 182.6 55.5 40.4 60.3
Approach LOS F E D E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.3 59.7 23.0 17.0 47.0 33.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 51.0 19.0 13.0 43.0 29.0 Max Q Clear Time (g_c+I1), s 2.1 27.1 21.0 15.0 45.0 30.4 Green Ext Time (p_c), s 0.0 9.5 0.0 0.0 0.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 73.4
HCM 7th LOS E
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 790 31 36 590 72 94
Future Volume (veh/h) 790 31 36 590 72 94
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 898 35 41 670 82 107
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1457 57 86 2097 128 167
Arrive On Green 0.41 0.41 0.05 0.58 0.18 0.18
Sat Flow, veh/h 3637 138 1810 3705 730 953
Grp Volume(v), veh/h 458 475 41 670 190 0
Grp Sat Flow(s),veh/h/ln 1805 1875 1810 1805 1692 0
Q Serve(g_s), s 6.6 6.6 0.7 3.1 3.4 0.0
Cycle Q Clear(g_c), s 6.6 6.6 0.7 3.1 3.4 0.0
Prop In Lane 0.07 1.00 0.43 0.56
Lane Grp Cap(c), veh/h 743 771 86 2097 297 0
V/C Ratio(X) 0.62 0.62 0.48 0.32 0.64 0.00
Avail Cap(c_a), veh/h 1430 1485 276 3849 876 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 7.6 7.6 15.2 3.5 12.6 0.0
Incr Delay (d2), s/veh 0.8 0.8 4.1 0.1 2.3 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.1 1.2 0.3 0.0 1.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 8.5 8.4 19.3 3.6 14.9 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 933 711 190
Approach Delay, s/veh 8.4 4.5 14.9
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 9.8 5.6 17.5 23.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 17.0 5.0 26.0 35.0
Max Q Clear Time (g_c+I1), s 5.4 2.7 8.6 5.1
Green Ext Time (p_c), s 0.4 0.0 4.9 4.3
Intersection Summary
HCM 7th Control Delay, s/veh 7.6
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 185 362 296 143 330 236 225 910 133 247 1179 151 Future Volume (veh/h) 185 362 296 143 330 236 225 910 133 247 1179 151 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 215 421 344 166 384 274 262 1058 155 287 1371 176 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 307 939 725 249 880 390 356 1721 527 388 1768 548 Arrive On Green 0.09 0.26 0.26 0.07 0.24 0.24 0.10 0.33 0.33 0.11 0.34 0.34 Sat Flow, veh/h 3510 3610 2785 3510 3610 1602 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 215 421 344 166 384 274 262 1058 155 287 1371 176 Grp Sat Flow(s),veh/h/ln 1755 1805 1392 1755 1805 1602 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 4.2 6.9 7.4 3.3 6.4 11.0 5.1 12.1 5.1 5.6 16.7 5.7 Cycle Q Clear(g_c), s 4.2 6.9 7.4 3.3 6.4 11.0 5.1 12.1 5.1 5.6 16.7 5.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 307 939 725 249 880 390 356 1721 527 388 1768 548 V/C Ratio(X) 0.70 0.45 0.47 0.67 0.44 0.70 0.74 0.61 0.29 0.74 0.78 0.32 Avail Cap(c_a), veh/h 348 1739 1342 249 1637 727 398 1838 562 497 1985 615 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.3 21.9 22.0 32.0 22.6 24.3 30.8 19.8 17.5 30.4 20.8 17.2 Incr Delay (d2), s/veh 5.3 0.3 0.5 6.7 0.3 2.3 6.2 0.6 0.3 4.3 1.8 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.8 2.6 2.1 1.5 2.4 3.9 2.3 4.2 1.6 2.4 6.0 1.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.6 22.2 22.5 38.6 22.9 26.6 37.0 20.4 17.8 34.7 22.6 17.6 LnGrp LOS D C C D C C D C B C C B
Approach Vol, veh/h 980 824 1475 1834
Approach Delay, s/veh 25.5 27.3 23.0 24.0
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.8 27.4 9.0 22.4 11.2 28.1 10.2 21.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 25.0 5.0 34.0 8.0 27.0 7.0 32.0 Max Q Clear Time (g_c+I1), s 7.6 14.1 5.3 9.4 7.1 18.7 6.2 13.0 Green Ext Time (p_c), s 0.2 5.2 0.0 3.9 0.1 5.3 0.1 3.0 Intersection Summary
HCM 7th Control Delay, s/veh 24.6
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 6 718 156 95 493 12 153 6 165 27 16 9 Future Volume (veh/h) 6 718 156 95 493 12 153 6 165 27 16 9 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 8 898 195 119 616 15 191 8 206 34 20 11 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 26 1248 539 181 1551 38 306 13 282 108 64 35 Arrive On Green 0.01 0.35 0.35 0.10 0.43 0.43 0.18 0.18 0.18 0.12 0.12 0.12 Sat Flow, veh/h 1810 3610 1559 1810 3599 88 1740 73 1607 940 553 304 Grp Volume(v), veh/h 8 898 195 119 309 322 199 0 206 65 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1559 1810 1805 1881 1813 0 1607 1797 0 0 Q Serve(g_s), s 0.3 13.2 5.7 3.8 7.1 7.1 6.2 0.0 7.4 2.0 0.0 0.0 Cycle Q Clear(g_c), s 0.3 13.2 5.7 3.8 7.1 7.1 6.2 0.0 7.4 2.0 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.05 0.96 1.00 0.52 0.17
Lane Grp Cap(c), veh/h 26 1248 539 181 778 811 319 0 282 207 0 0 V/C Ratio(X) 0.30 0.72 0.36 0.66 0.40 0.40 0.62 0.00 0.73 0.31 0.00 0.00 Avail Cap(c_a), veh/h 209 1664 719 298 921 960 567 0 503 207 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 29.6 17.3 14.9 26.3 11.9 11.9 23.2 0.0 23.7 24.7 0.0 0.0 Incr Delay (d2), s/veh 6.3 1.0 0.4 4.1 0.3 0.3 2.0 0.0 3.6 0.9 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 4.5 1.7 1.7 2.2 2.3 2.5 0.0 2.7 0.8 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.9 18.3 15.3 30.4 12.2 12.2 25.2 0.0 27.3 25.5 0.0 0.0 LnGrp LOS D B B C B B C C C
Approach Vol, veh/h 1101 750 405 65
Approach Delay, s/veh 17.9 15.1 26.2 25.5
Approach LOS B B C C
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 14.7 10.1 25.0 11.0 4.9 30.2
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 19.0 10.0 28.0 7.0 7.0 31.0 Max Q Clear Time (g_c+I1), s 9.4 5.8 15.2 4.0 2.3 9.1
Green Ext Time (p_c), s 1.2 0.1 5.1 0.0 0.0 3.3
Intersection Summary
HCM 7th Control Delay, s/veh 18.7
HCM 7th LOS B
h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 64 434 195 290 254 55 129 92 249 81 176 15 Future Volume (veh/h) 64 434 195 290 254 55 129 92 249 81 176 15 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.92 1.00 0.91 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 75 511 229 341 299 65 152 108 293 95 207 18 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 97 707 315 437 962 429 232 767 598 139 708 62 Arrive On Green 0.05 0.20 0.20 0.12 0.27 0.27 0.07 0.40 0.40 0.08 0.41 0.41 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1480 1810 1708 148 Grp Volume(v), veh/h 75 511 229 341 299 65 152 108 293 95 0 225 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1480 1810 0 1856 Q Serve(g_s), s 3.3 10.7 10.7 7.6 5.3 2.5 3.4 2.9 11.8 4.1 0.0 6.5 Cycle Q Clear(g_c), s 3.3 10.7 10.7 7.6 5.3 2.5 3.4 2.9 11.8 4.1 0.0 6.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.08
Lane Grp Cap(c), veh/h 97 707 315 437 962 429 232 767 598 139 0 769 V/C Ratio(X) 0.77 0.72 0.73 0.78 0.31 0.15 0.65 0.14 0.49 0.68 0.00 0.29 Avail Cap(c_a), veh/h 203 1124 501 524 1258 561 350 804 626 180 0 786 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 37.5 30.3 30.3 34.1 23.6 22.5 36.6 15.1 17.8 36.1 0.0 15.7 Incr Delay (d2), s/veh 12.0 1.4 3.2 6.2 0.2 0.2 3.1 0.1 0.6 6.9 0.0 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.7 4.3 4.1 3.4 2.1 0.9 1.5 1.1 3.6 2.0 0.0 2.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 49.5 31.7 33.5 40.3 23.7 22.7 39.7 15.2 18.4 43.1 0.0 15.9 LnGrp LOS D C C D C C D B B D B
Approach Vol, veh/h 815 705 553 320
Approach Delay, s/veh 33.8 31.7 23.7 24.0
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.2 36.4 14.0 19.7 9.3 37.3 8.3 25.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 34.0 12.0 25.0 8.0 34.0 9.0 28.0 Max Q Clear Time (g_c+I1), s 6.1 13.8 9.6 12.7 5.4 8.5 5.3 7.3 Green Ext Time (p_c), s 0.0 1.5 0.3 3.0 0.1 1.1 0.0 1.8 Intersection Summary
HCM 7th Control Delay, s/veh 29.5
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 55 599 25 43 263 73 41 49 137 230 37 82 Future Volume (veh/h) 55 599 25 43 263 73 41 49 137 230 37 82 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 69 749 31 54 329 91 51 61 171 288 46 102 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 113 1137 505 97 1104 490 180 340 287 427 474 395 Arrive On Green 0.06 0.31 0.31 0.05 0.31 0.31 0.05 0.18 0.18 0.12 0.25 0.25 Sat Flow, veh/h 1810 3610 1603 1810 3610 1602 3510 1900 1602 3510 1900 1584 Grp Volume(v), veh/h 69 749 31 54 329 91 51 61 171 288 46 102 Grp Sat Flow(s),veh/h/ln 1810 1805 1603 1810 1805 1602 1755 1900 1602 1755 1900 1584 Q Serve(g_s), s 1.8 8.7 0.7 1.4 3.4 2.0 0.7 1.3 4.7 3.8 0.9 2.5 Cycle Q Clear(g_c), s 1.8 8.7 0.7 1.4 3.4 2.0 0.7 1.3 4.7 3.8 0.9 2.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 113 1137 505 97 1104 490 180 340 287 427 474 395 V/C Ratio(X) 0.61 0.66 0.06 0.56 0.30 0.19 0.28 0.18 0.60 0.67 0.10 0.26 Avail Cap(c_a), veh/h 224 1940 861 187 1866 828 363 1375 1159 581 1492 1244 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.1 14.3 11.6 22.3 12.8 12.4 22.1 16.8 18.2 20.3 14.0 14.6 Incr Delay (d2), s/veh 5.2 0.7 0.1 5.0 0.1 0.2 0.9 0.2 2.0 1.9 0.1 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 2.7 0.2 0.6 1.0 0.6 0.3 0.5 1.5 1.4 0.3 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.3 15.0 11.6 27.3 13.0 12.5 22.9 17.1 20.2 22.2 14.0 14.9 LnGrp LOS C B B C B B C B C C B B
Approach Vol, veh/h 849 474 283 436
Approach Delay, s/veh 15.9 14.5 20.0 19.6
Approach LOS B B C B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.9 12.7 6.6 19.2 6.5 16.1 7.0 18.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 35.0 5.0 26.0 5.0 38.0 6.0 25.0 Max Q Clear Time (g_c+I1), s 5.8 6.7 3.4 10.7 2.7 4.5 3.8 5.4 Green Ext Time (p_c), s 0.2 0.8 0.0 4.1 0.0 0.5 0.0 2.0 Intersection Summary
HCM 7th Control Delay, s/veh 16.9
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 22 330 377 151 164 100 198 884 200 160 1174 26 Future Volume (veh/h) 22 330 377 151 164 100 198 884 200 160 1174 26 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 23 351 401 161 174 106 211 940 213 170 1249 28 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 89 1085 483 246 1790 548 306 1791 549 237 1690 517 Arrive On Green 0.03 0.30 0.30 0.07 0.35 0.35 0.09 0.35 0.35 0.07 0.33 0.33 Sat Flow, veh/h 3510 3610 1609 3510 5187 1587 3510 5187 1588 3510 5187 1588 Grp Volume(v), veh/h 23 351 401 161 174 106 211 940 213 170 1249 28 Grp Sat Flow(s),veh/h/ln 1755 1805 1609 1755 1729 1587 1755 1729 1588 1755 1729 1588 Q Serve(g_s), s 0.5 5.6 17.2 3.3 1.7 3.5 4.3 10.7 7.5 3.5 15.8 0.9 Cycle Q Clear(g_c), s 0.5 5.6 17.2 3.3 1.7 3.5 4.3 10.7 7.5 3.5 15.8 0.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 89 1085 483 246 1790 548 306 1791 549 237 1690 517 V/C Ratio(X) 0.26 0.32 0.83 0.65 0.10 0.19 0.69 0.52 0.39 0.72 0.74 0.05 Avail Cap(c_a), veh/h 237 1563 696 332 2386 730 475 2456 752 237 2105 645 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.3 20.0 24.1 33.5 16.4 17.0 32.8 19.3 18.3 33.8 22.1 17.1 Incr Delay (d2), s/veh 1.5 0.2 5.7 2.9 0.0 0.2 2.8 0.2 0.4 9.8 1.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 2.1 6.4 1.4 0.6 1.1 1.8 3.7 2.4 1.7 5.7 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.8 20.2 29.7 36.4 16.4 17.2 35.5 19.6 18.7 43.6 23.2 17.1 LnGrp LOS D C C D B B D B B D C B
Approach Vol, veh/h 775 441 1364 1447
Approach Delay, s/veh 25.6 23.9 21.9 25.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.0 29.5 9.2 26.2 10.4 28.1 5.9 29.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 7.0 32.0 10.0 30.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 5.5 12.7 5.3 19.2 6.3 17.8 2.5 5.5 Green Ext Time (p_c), s 0.0 6.8 0.1 2.8 0.2 6.2 0.0 1.3 Intersection Summary
HCM 7th Control Delay, s/veh 24.1
HCM 7th LOS C
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 49 1001 214 230 551 43 143 483 170 43 595 48 Future Volume (veh/h) 49 1001 214 230 551 43 143 483 170 43 595 48 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 52 1065 228 245 586 46 152 514 181 46 633 51 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 162 1335 594 340 1426 112 244 919 407 150 1182 363 Arrive On Green 0.05 0.37 0.37 0.10 0.42 0.42 0.07 0.25 0.25 0.04 0.23 0.23 Sat Flow, veh/h 3510 3610 1608 3510 3391 266 3510 3610 1597 3510 5187 1595 Grp Volume(v), veh/h 52 1065 228 245 311 321 152 514 181 46 633 51 Grp Sat Flow(s),veh/h/ln 1755 1805 1608 1755 1805 1852 1755 1805 1597 1755 1729 1595 Q Serve(g_s), s 1.0 17.9 7.1 4.6 8.2 8.2 2.9 8.4 6.5 0.9 7.3 1.7 Cycle Q Clear(g_c), s 1.0 17.9 7.1 4.6 8.2 8.2 2.9 8.4 6.5 0.9 7.3 1.7 Prop In Lane 1.00 1.00 1.00 0.14 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 162 1335 594 340 759 779 244 919 407 150 1182 363 V/C Ratio(X) 0.32 0.80 0.38 0.72 0.41 0.41 0.62 0.56 0.45 0.31 0.54 0.14 Avail Cap(c_a), veh/h 259 1545 688 363 826 847 259 1758 778 259 2526 777 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.3 19.1 15.7 29.7 13.8 13.8 30.7 22.0 21.2 31.5 23.0 20.9 Incr Delay (d2), s/veh 1.1 2.7 0.4 6.4 0.4 0.3 4.2 0.5 0.8 1.1 0.4 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 6.9 2.3 2.1 2.9 3.0 1.2 3.1 2.3 0.3 2.6 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 32.4 21.7 16.1 36.1 14.1 14.1 34.8 22.5 22.0 32.6 23.4 21.0 LnGrp LOS C C B D B B C C C C C C
Approach Vol, veh/h 1345 877 847 730
Approach Delay, s/veh 21.2 20.3 24.6 23.8
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.9 21.3 10.6 29.1 8.7 19.4 7.1 32.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 33.0 7.0 29.0 5.0 33.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 2.9 10.4 6.6 19.9 4.9 9.3 3.0 10.2 Green Ext Time (p_c), s 0.0 3.5 0.0 5.1 0.0 3.9 0.0 3.5 Intersection Summary
HCM 7th Control Delay, s/veh 22.2
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 144 817 153 150 518 42 194 607 132 168 725 175 Future Volume (veh/h) 144 817 153 150 518 42 194 607 132 168 725 175 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 152 860 161 158 545 44 204 639 139 177 763 184 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 264 1677 513 266 1680 507 307 1355 420 281 1316 408 Arrive On Green 0.08 0.32 0.32 0.08 0.32 0.32 0.09 0.26 0.26 0.08 0.25 0.25 Sat Flow, veh/h 3510 5187 1586 3510 5187 1565 3510 5187 1608 3510 5187 1608 Grp Volume(v), veh/h 152 860 161 158 545 44 204 639 139 177 763 184 Grp Sat Flow(s),veh/h/ln 1755 1729 1586 1755 1729 1565 1755 1729 1608 1755 1729 1608 Q Serve(g_s), s 2.6 8.3 4.7 2.7 4.9 1.2 3.5 6.4 4.3 3.0 7.9 5.9 Cycle Q Clear(g_c), s 2.6 8.3 4.7 2.7 4.9 1.2 3.5 6.4 4.3 3.0 7.9 5.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 264 1677 513 266 1680 507 307 1355 420 281 1316 408 V/C Ratio(X) 0.58 0.51 0.31 0.59 0.32 0.09 0.66 0.47 0.33 0.63 0.58 0.45 Avail Cap(c_a), veh/h 342 2610 798 342 2610 788 399 2779 862 513 2947 914 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.5 16.9 15.7 27.6 15.7 14.5 27.2 19.2 18.4 27.4 20.1 19.4 Incr Delay (d2), s/veh 2.0 0.2 0.3 2.1 0.1 0.1 2.7 0.3 0.5 2.3 0.4 0.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 2.8 1.4 1.1 1.6 0.4 1.4 2.1 1.4 1.2 2.7 1.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.5 17.2 16.0 29.7 15.8 14.6 29.9 19.4 18.9 29.8 20.5 20.1 LnGrp LOS C B B C B B C B B C C C
Approach Vol, veh/h 1173 747 982 1124
Approach Delay, s/veh 18.6 18.7 21.5 21.9
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.9 20.1 8.7 23.9 9.4 19.6 8.6 23.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 9.0 33.0 6.0 31.0 7.0 35.0 6.0 31.0 Max Q Clear Time (g_c+I1), s 5.0 8.4 4.7 10.3 5.5 9.9 4.6 6.9 Green Ext Time (p_c), s 0.2 4.3 0.1 6.1 0.1 5.4 0.1 3.4 Intersection Summary
HCM 7th Control Delay, s/veh 20.3
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/21/2025 Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 43 91 278 160 107 59 177 865 209 44 922 18 Future Volume (veh/h) 43 91 278 160 107 59 177 865 209 44 922 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 47 99 302 174 116 64 192 940 227 48 1002 20 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 81 460 382 217 604 502 238 1409 339 82 1306 404 Arrive On Green 0.04 0.24 0.24 0.12 0.32 0.32 0.13 0.34 0.34 0.05 0.25 0.25 Sat Flow, veh/h 1810 1900 1576 1810 1900 1579 1810 4170 1004 1810 5187 1604 Grp Volume(v), veh/h 47 99 302 174 116 64 192 779 388 48 1002 20 Grp Sat Flow(s),veh/h/ln 1810 1900 1576 1810 1900 1579 1810 1729 1716 1810 1729 1604 Q Serve(g_s), s 1.6 2.6 11.3 5.9 2.8 1.8 6.5 12.1 12.2 1.6 11.3 0.6 Cycle Q Clear(g_c), s 1.6 2.6 11.3 5.9 2.8 1.8 6.5 12.1 12.2 1.6 11.3 0.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.59 1.00 1.00
Lane Grp Cap(c), veh/h 81 460 382 217 604 502 238 1168 580 82 1306 404 V/C Ratio(X) 0.58 0.22 0.79 0.80 0.19 0.13 0.81 0.67 0.67 0.59 0.77 0.05 Avail Cap(c_a), veh/h 144 665 552 259 786 653 288 1266 628 144 1486 459 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.4 19.0 22.3 26.9 15.6 15.2 26.5 17.8 17.8 29.4 21.8 17.8 Incr Delay (d2), s/veh 6.5 0.2 4.9 13.9 0.2 0.1 13.2 1.2 2.5 6.6 2.2 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 1.0 4.1 3.1 1.1 0.6 3.3 4.0 4.2 0.8 4.0 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.0 19.3 27.3 40.8 15.7 15.4 39.7 19.0 20.3 36.0 24.0 17.9 LnGrp LOS D B C D B B D B C D C B
Approach Vol, veh/h 448 354 1359 1070
Approach Delay, s/veh 26.4 28.0 22.3 24.4
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.8 25.2 11.5 19.2 12.3 19.8 6.8 24.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 23.0 9.0 22.0 10.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.6 14.2 7.9 13.3 8.5 13.3 3.6 4.8 Green Ext Time (p_c), s 0.0 4.4 0.0 1.0 0.1 2.5 0.0 0.7 Intersection Summary
HCM 7th Control Delay, s/veh 24.2
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 17 4 35 88 10 48 52 1228 120 60 1265 27 Future Volume (veh/h) 17 4 35 88 10 48 52 1228 120 60 1265 27 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 19 4 38 97 11 53 57 1349 132 66 1390 30 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 43 19 185 278 344 288 103 1894 586 114 1925 583 Arrive On Green 0.02 0.13 0.13 0.08 0.18 0.18 0.06 0.37 0.37 0.06 0.37 0.37 Sat Flow, veh/h 1810 156 1478 3510 1900 1589 1810 5187 1604 1810 5187 1570 Grp Volume(v), veh/h 19 0 42 97 11 53 57 1349 132 66 1390 30 Grp Sat Flow(s),veh/h/ln 1810 0 1634 1755 1900 1589 1810 1729 1604 1810 1729 1570 Q Serve(g_s), s 0.5 0.0 1.0 1.1 0.2 1.2 1.3 9.7 2.5 1.5 10.0 0.5 Cycle Q Clear(g_c), s 0.5 0.0 1.0 1.1 0.2 1.2 1.3 9.7 2.5 1.5 10.0 0.5 Prop In Lane 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 43 0 205 278 344 288 103 1894 586 114 1925 583 V/C Ratio(X) 0.45 0.00 0.21 0.35 0.03 0.18 0.55 0.71 0.23 0.58 0.72 0.05 Avail Cap(c_a), veh/h 208 0 975 403 1134 948 208 2143 662 208 2143 649 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.0 0.0 17.1 19.0 14.7 15.1 20.0 11.9 9.6 19.8 11.8 8.8 Incr Delay (d2), s/veh 7.1 0.0 0.5 0.7 0.0 0.3 4.5 1.0 0.2 4.5 1.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 0.3 0.4 0.1 0.4 0.6 2.4 0.6 0.6 2.5 0.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 28.1 0.0 17.6 19.7 14.7 15.4 24.5 12.8 9.8 24.4 12.9 8.8 LnGrp LOS C B B B B C B A C B A
Approach Vol, veh/h 61 161 1538 1486
Approach Delay, s/veh 20.9 18.0 13.0 13.3
Approach LOS C B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.8 19.9 7.5 9.5 6.5 20.2 5.0 11.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 18.0 5.0 26.0 5.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.5 11.7 3.1 3.0 3.3 12.0 2.5 3.2 Green Ext Time (p_c), s 0.0 4.1 0.0 0.1 0.0 3.9 0.0 0.2 Intersection Summary
HCM 7th Control Delay, s/veh 13.5
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 136 0 192 0 0 0 180 1272 0 0 1215 170 Future Volume (veh/h) 136 0 192 0 0 0 180 1272 0 0 1215 170 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 151 0 213 0 0 0 200 1413 0 0 1350 189 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 1036 0 321 0 378 0 253 3183 0 0 1971 612
Arrive On Green 0.20 0.00 0.20 0.00 0.00 0.00 0.14 0.61 0.00 0.00 0.38 0.38 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 151 0 213 0 0 0 200 1413 0 0 1350 189 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 1.5 0.0 5.2 0.0 0.0 0.0 4.6 6.2 0.0 0.0 9.3 3.5 Cycle Q Clear(g_c), s 1.5 0.0 5.2 0.0 0.0 0.0 4.6 6.2 0.0 0.0 9.3 3.5 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 1036 0 321 0 378 0 253 3183 0 0 1971 612 V/C Ratio(X) 0.15 0.00 0.66 0.00 0.00 0.00 0.79 0.44 0.00 0.00 0.68 0.31 Avail Cap(c_a), veh/h 2145 0 829 0 979 0 297 3643 0 0 2307 716 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 14.3 0.0 15.8 0.0 0.0 0.0 17.8 4.4 0.0 0.0 11.1 9.3 Incr Delay (d2), s/veh 0.1 0.0 2.4 0.0 0.0 0.0 11.7 0.1 0.0 0.0 0.7 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 1.6 0.0 0.0 0.0 2.2 0.4 0.0 0.0 2.2 0.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 14.4 0.0 18.2 0.0 0.0 0.0 29.4 4.5 0.0 0.0 11.8 9.6 LnGrp LOS B B C A B A
Approach Vol, veh/h 364 0 1613 1539
Approach Delay, s/veh 16.6 0.0 7.6 11.5
Approach LOS B A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 30.2 12.5 10.0 20.2 12.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 30.0 22.0 7.0 19.0 22.0
Max Q Clear Time (g_c+I1), s 8.2 7.2 6.6 11.3 0.0
Green Ext Time (p_c), s 9.4 1.4 0.0 4.9 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 10.2
HCM 7th LOS B
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Project Dwy G/Jet Way 01/01/2026
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 42 0 204 60 0 12 253 1704 73 10 1614 46 Future Volume (veh/h) 42 0 204 60 0 12 253 1704 73 10 1614 46 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 1870 1900 1900 1900 1900 1870 Adj Flow Rate, veh/h 0 0 262 71 0 14 266 2005 86 12 1899 48 Peak Hour Factor 0.95 0.95 0.95 0.85 0.95 0.85 0.95 0.85 0.85 0.85 0.85 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 2 0 0 0 0 2
Cap, veh/h 0 240 407 278 0 204 321 3302 1025 28 2446 748 Arrive On Green 0.00 0.00 0.13 0.13 0.00 0.13 0.18 0.64 0.64 0.02 0.47 0.47 Sat Flow, veh/h 0 1870 3170 1135 0 1585 1781 5187 1610 1810 5187 1585 Grp Volume(v), veh/h 0 0 262 71 0 14 266 2005 86 12 1899 48 Grp Sat Flow(s),veh/h/ln 0 1870 1585 1135 0 1585 1781 1729 1610 1810 1729 1585 Q Serve(g_s), s 0.0 0.0 4.3 3.2 0.0 0.4 7.9 12.5 1.1 0.4 16.7 0.9 Cycle Q Clear(g_c), s 0.0 0.0 4.3 3.2 0.0 0.4 7.9 12.5 1.1 0.4 16.7 0.9 Prop In Lane 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 240 407 278 0 204 321 3302 1025 28 2446 748 V/C Ratio(X) 0.00 0.00 0.64 0.26 0.00 0.07 0.83 0.61 0.08 0.44 0.78 0.06 Avail Cap(c_a), veh/h 0 616 1044 506 0 522 391 3323 1031 166 2658 812 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 0.0 0.0 22.6 22.1 0.0 20.9 21.6 5.9 3.8 26.7 12.0 7.9 Incr Delay (d2), s/veh 0.0 0.0 1.7 0.5 0.0 0.1 11.7 0.3 0.0 10.4 1.4 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 1.5 0.8 0.0 0.2 3.7 1.7 0.1 0.2 4.3 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 24.3 22.6 0.0 21.1 33.3 6.2 3.8 37.1 13.4 7.9 LnGrp LOS C C C C A A D B A
Approach Vol, veh/h 262 85 2357 1959
Approach Delay, s/veh 24.3 22.4 9.2 13.4
Approach LOS C C A B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.8 38.8 11.0 13.8 29.8 11.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 35.0 18.0 12.0 28.0 18.0 Max Q Clear Time (g_c+I1), s 2.4 14.5 6.3 9.9 18.7 5.2
Green Ext Time (p_c), s 0.0 13.8 0.8 0.2 7.1 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 12.1
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 7 h 1 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 314 201 0 1713 1691 618
Future Volume (veh/h) 314 201 0 1713 1691 618
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 379 191 0 1903 1879 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 688 306 0 3212 3212
Arrive On Green 0.19 0.19 0.00 0.62 0.62 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 379 191 0 1903 1879 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 4.0 4.6 0.0 9.3 9.1 0.0
Cycle Q Clear(g_c), s 4.0 4.6 0.0 9.3 9.1 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 688 306 0 3212 3212
V/C Ratio(X) 0.55 0.62 0.00 0.59 0.59
Avail Cap(c_a), veh/h 1293 575 0 4572 4572
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 15.4 15.6 0.0 4.8 4.8 0.0
Incr Delay (d2), s/veh 0.7 2.1 0.0 0.2 0.2 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.5 1.6 0.0 0.5 0.5 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 16.1 17.7 0.0 5.0 4.9 0.0
LnGrp LOS B B A A
Approach Vol, veh/h 570 1903 1879
Approach Delay, s/veh 16.6 5.0 4.9
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 30.0 12.0 30.0
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 37.0 15.0 37.0
Max Q Clear Time (g_c+I1), s 11.3 6.6 11.1
Green Ext Time (p_c), s 14.7 1.4 14.6
Intersection Summary
HCM 7th Control Delay, s/veh 6.5
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 408 0 81 0 1632 724 369 1518 0 Future Volume (veh/h) 0 0 0 408 0 81 0 1632 724 369 1518 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 458 0 91 0 1834 813 415 1706 0 Peak Hour Factor 0.95 0.95 0.95 0.89 0.95 0.89 0.95 0.89 0.89 0.89 0.89 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 3 0 639 0 568 0 2349 1004 534 3516 0
Arrive On Green 0.00 0.00 0.00 0.18 0.00 0.18 0.00 0.45 0.45 0.15 0.68 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 458 0 91 0 1834 813 415 1706 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 6.6 0.0 1.3 0.0 16.4 21.3 6.2 8.7 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 6.6 0.0 1.3 0.0 16.4 21.3 6.2 8.7 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 3 0 639 0 568 0 2349 1004 534 3516 0 V/C Ratio(X) 0.00 0.00 0.00 0.72 0.00 0.16 0.00 0.78 0.81 0.78 0.49 0.00 Avail Cap(c_a), veh/h 0 238 0 1186 0 1700 0 2360 1008 575 3587 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 21.3 0.0 19.2 0.0 12.7 7.7 22.4 4.2 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 1.5 0.0 0.1 0.0 1.7 5.0 6.2 0.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 2.5 0.0 0.4 0.0 4.5 4.9 2.6 0.8 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 22.9 0.0 19.3 0.0 14.5 12.7 28.6 4.4 0.0 LnGrp LOS C B B B C A
Approach Vol, veh/h 0 549 2647 2121
Approach Delay, s/veh 0.0 22.3 13.9 9.1
Approach LOS C B A
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 12.4 28.9 13.7 0.0 41.2 13.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 9.0 25.0 18.0 7.0 38.0 29.0 Max Q Clear Time (g_c+I1), s 8.2 23.3 8.6 0.0 10.7 3.3
Green Ext Time (p_c), s 0.1 1.6 1.1 0.0 13.2 0.3
Intersection Summary
HCM 7th Control Delay, s/veh 12.9
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/21/2025 Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 164 324 63 199 522 342 243 1621 163 273 978 453 Future Volume (veh/h) 164 324 63 199 522 342 243 1621 163 273 978 453 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 184 364 71 224 587 384 273 1821 183 307 1099 509 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 223 1324 406 289 1423 436 338 2000 200 350 2183 678 Arrive On Green 0.06 0.26 0.26 0.08 0.27 0.27 0.10 0.42 0.42 0.10 0.42 0.42 Sat Flow, veh/h 3510 5187 1589 3510 5187 1588 3510 4792 479 3510 5187 1610 Grp Volume(v), veh/h 184 364 71 224 587 384 273 1312 692 307 1099 509 Grp Sat Flow(s),veh/h/ln 1755 1729 1589 1755 1729 1588 1755 1729 1814 1755 1729 1610 Q Serve(g_s), s 5.7 6.2 3.8 6.9 10.2 25.5 8.4 39.3 39.7 9.5 17.2 29.5 Cycle Q Clear(g_c), s 5.7 6.2 3.8 6.9 10.2 25.5 8.4 39.3 39.7 9.5 17.2 29.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.26 1.00 1.00
Lane Grp Cap(c), veh/h 223 1324 406 289 1423 436 338 1443 757 350 2183 678 V/C Ratio(X) 0.83 0.27 0.17 0.77 0.41 0.88 0.81 0.91 0.91 0.88 0.50 0.75 Avail Cap(c_a), veh/h 223 1364 418 382 1599 490 414 1474 773 350 2183 678 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 51.0 32.9 32.0 49.6 32.7 38.3 48.8 30.2 30.3 49.0 23.5 27.1 Incr Delay (d2), s/veh 21.8 0.1 0.2 7.0 0.2 15.7 9.4 8.5 15.2 21.3 0.2 4.7 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.1 2.5 1.5 3.2 4.1 11.4 3.9 16.3 18.7 5.0 6.4 11.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 72.8 33.0 32.2 56.6 32.9 54.0 58.2 38.7 45.5 70.3 23.7 31.8 LnGrp LOS E C C E C D E D D E C C
Approach Vol, veh/h 619 1195 2277 1915
Approach Delay, s/veh 44.8 44.1 43.1 33.3
Approach LOS D D D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 15.0 50.0 13.1 32.2 14.6 50.4 11.0 34.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 47.0 12.0 29.0 13.0 45.0 7.0 34.0 Max Q Clear Time (g_c+I1), s 11.5 41.7 8.9 8.2 10.4 31.5 7.7 27.5 Green Ext Time (p_c), s 0.0 4.4 0.2 2.3 0.2 7.1 0.0 2.7 Intersection Summary
HCM 7th Control Delay, s/veh 40.3
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 200 0 246 0 0 0 106 619 0 0 1019 112 Future Volume (veh/h) 200 0 246 0 0 0 106 619 0 0 1019 112 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 217 0 267 0 0 0 115 673 0 0 1108 122 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 607 0 0 0 5 0 334 3131 0 0 2057 630
Arrive On Green 0.17 0.00 0.00 0.00 0.00 0.00 0.10 0.60 0.00 0.00 0.40 0.40 Sat Flow, veh/h 3510 217 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 217 13.4 0 0 0 115 673 0 0 1108 122 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 2.0 0.0 0.0 0.0 1.1 2.1 0.0 0.0 5.9 1.8 Cycle Q Clear(g_c), s 2.0 0.0 0.0 0.0 1.1 2.1 0.0 0.0 5.9 1.8 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 607 0 5 0 334 3131 0 0 2057 630
V/C Ratio(X) 0.36 0.00 0.00 0.00 0.34 0.21 0.00 0.00 0.54 0.19 Avail Cap(c_a), veh/h 2746 0 1539 0 490 4492 0 0 3188 977 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 13.0 0.0 0.0 0.0 15.1 3.2 0.0 0.0 8.3 7.1 Incr Delay (d2), s/veh 0.4 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.2 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 0.0 0.0 0.3 0.0 0.0 0.0 1.1 0.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.4 0.0 0.0 0.0 15.8 3.3 0.0 0.0 8.5 7.2 LnGrp LOS B B A A A
Approach Vol, veh/h 0 788 1230
Approach Delay, s/veh 0.0 5.1 8.4
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 25.6 7.4 18.2 10.2 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 4.1 3.1 7.9 4.0 0.0
Green Ext Time (p_c), s 4.3 0.0 6.2 0.7 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.7
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 134 784 186 209 384 158 89 491 193 380 785 92 Future Volume (veh/h) 134 784 186 209 384 158 89 491 193 380 785 92 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.98 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 144 843 200 225 413 170 96 528 208 409 844 99 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 253 1526 464 274 1557 474 224 1151 352 548 1629 498 Arrive On Green 0.07 0.29 0.29 0.08 0.30 0.30 0.06 0.22 0.22 0.16 0.31 0.31 Sat Flow, veh/h 3510 5187 1576 3510 5187 1578 3510 5187 1585 3510 5187 1587 Grp Volume(v), veh/h 144 843 200 225 413 170 96 528 208 409 844 99 Grp Sat Flow(s),veh/h/ln 1755 1729 1576 1755 1729 1578 1755 1729 1585 1755 1729 1587 Q Serve(g_s), s 2.5 8.8 6.6 4.0 3.9 5.4 1.7 5.6 7.5 7.1 8.5 2.9 Cycle Q Clear(g_c), s 2.5 8.8 6.6 4.0 3.9 5.4 1.7 5.6 7.5 7.1 8.5 2.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 253 1526 464 274 1557 474 224 1151 352 548 1629 498 V/C Ratio(X) 0.57 0.55 0.43 0.82 0.27 0.36 0.43 0.46 0.59 0.75 0.52 0.20 Avail Cap(c_a), veh/h 274 2753 837 274 2753 838 329 2834 866 548 3158 966 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.8 19.1 18.3 29.1 17.0 17.6 28.9 21.6 22.3 25.8 18.0 16.1 Incr Delay (d2), s/veh 2.4 0.3 0.6 17.8 0.1 0.5 1.3 0.3 1.6 5.6 0.3 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 3.1 2.1 2.2 1.3 1.7 0.7 2.0 2.6 3.0 2.9 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 31.1 19.4 18.9 46.9 17.1 18.0 30.1 21.9 23.9 31.4 18.3 16.3 LnGrp LOS C B B D B B C C C C B B
Approach Vol, veh/h 1187 808 832 1352
Approach Delay, s/veh 20.7 25.6 23.3 22.1
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.0 18.2 9.0 22.8 8.1 24.1 8.6 23.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 35.0 5.0 34.0 6.0 39.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 9.1 9.5 6.0 10.8 3.7 10.5 4.5 7.4 Green Ext Time (p_c), s 0.1 4.0 0.0 6.3 0.0 6.0 0.0 3.2 Intersection Summary
HCM 7th Control Delay, s/veh 22.6
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/21/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 57 87 183 87 36 71 99 694 63 52 1096 55 Future Volume (veh/h) 57 87 183 87 36 71 99 694 63 52 1096 55 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 64 98 206 98 40 80 111 780 71 58 1231 62 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 99 334 283 126 362 303 143 2066 627 94 1924 584 Arrive On Green 0.05 0.18 0.18 0.07 0.19 0.19 0.08 0.40 0.40 0.05 0.37 0.37 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 64 98 206 98 40 80 111 780 71 58 1231 62 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 2.1 2.7 7.2 3.2 1.0 2.5 3.6 6.3 1.7 1.9 11.6 1.5 Cycle Q Clear(g_c), s 2.1 2.7 7.2 3.2 1.0 2.5 3.6 6.3 1.7 1.9 11.6 1.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 99 334 283 126 362 303 143 2066 627 94 1924 584 V/C Ratio(X) 0.64 0.29 0.73 0.77 0.11 0.26 0.77 0.38 0.11 0.62 0.64 0.11 Avail Cap(c_a), veh/h 275 1252 1061 183 1156 965 214 2980 905 245 3067 931 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.4 21.2 23.1 27.1 19.8 20.4 26.7 12.6 11.2 27.5 15.4 12.2 Incr Delay (d2), s/veh 6.8 0.5 3.6 11.8 0.1 0.5 9.6 0.1 0.1 6.4 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 1.1 2.8 1.7 0.4 0.9 1.7 1.9 0.5 0.9 3.6 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 34.2 21.7 26.6 38.9 19.9 20.9 36.4 12.7 11.3 33.9 15.7 12.3 LnGrp LOS C C C D B C D B B C B B
Approach Vol, veh/h 368 218 962 1351
Approach Delay, s/veh 26.6 28.8 15.4 16.3
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.1 27.6 8.1 16.4 8.7 26.0 7.3 17.3 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 8.0 34.0 6.0 39.0 7.0 35.0 9.0 36.0 Max Q Clear Time (g_c+I1), s 3.9 8.3 5.2 9.2 5.6 13.6 4.1 4.5 Green Ext Time (p_c), s 0.0 5.3 0.0 1.3 0.0 8.4 0.0 0.5 Intersection Summary
HCM 7th Control Delay, s/veh 18.3
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
HCM 7th TWSC SWC Rosedale & Coffee
27: El Toro Viejo Rd & Project Dwy A 12/28/2025
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 4.9
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 6 90 81 6 98 51
Future Vol, veh/h 6 90 81 6 98 51
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 0 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 6 95 85 6 103 54
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 322 46 0 0 92 0
Stage 1 88 - - - - -
Stage 2 233 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 647 1014 - - 1501 -
Stage 1 925 - - - - -
Stage 2 784 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 603 1014 - - 1501 -
Mov Cap-2 Maneuver 603 - - - - -
Stage 1 925 - - - - -
Stage 2 730 - - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 9.13 0 4.98
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 972 1501 -
HCM Lane V/C Ratio - - 0.104 0.069 -
HCM Ctrl Dly (s/v) - - 9.1 7.6 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - 0.3 0.2 -
* *1 h *
HCM 7th TWSC SWC Rosedale & Coffee
28: Project Dwy B & Rosedale Highway 12/28/2025
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1444 26 0 910 0 24
Future Vol, veh/h 1444 26 0 910 0 24
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 90 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1520 27 0 958 0 25
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 760
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 299
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 299
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 18.15
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 299 - - -
HCM Lane V/C Ratio 0.084 - - -
HCM Ctrl Dly (s/v) 18.1 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.3 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
29: Project Dwy C & Rosedale Highway 12/28/2025
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1438 24 0 954 0 24
Future Vol, veh/h 1438 24 0 954 0 24
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1514 25 0 1004 0 25
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 757
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 300
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 300
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 18.08
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 300 - - -
HCM Lane V/C Ratio 0.084 - - -
HCM Ctrl Dly (s/v) 18.1 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.3 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
30: Project Dwy E & Rosedale Highway 12/28/2025
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1344 18 0 949 0 36
Future Vol, veh/h 1344 18 0 949 0 36
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1415 19 0 999 0 38
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 707
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 324
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 324
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 17.59
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 324 - - -
HCM Lane V/C Ratio 0.117 - - -
HCM Ctrl Dly (s/v) 17.6 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.4 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
31: Coffee Road & Project Dwy F 12/28/2025
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 18 0 1836 1658 32
Future Vol, veh/h 0 18 0 1836 1658 32
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - 50
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 19 0 1933 1745 34
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 873 - 0 - 0
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 252 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 252 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 20.44 0 0
HCM LOS C
Minor Lane/Major Mvmt NBT EBLn1 SBT SBR
Capacity (veh/h) - 252 - -
HCM Lane V/C Ratio - 0.075 - -
HCM Ctrl Dly (s/v) - 20.4 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.2 - -
I* 7
HCM 7th TWSC SWC Rosedale & Coffee
32: Coffee Road & Project Dwy H 12/28/2025
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 18 0 2030 1878 0
Future Vol, veh/h 0 18 0 2030 1878 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 19 0 2137 1977 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 988 - 0 - 0
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 211 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 211 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 23.72 0 0
HCM LOS C
Minor Lane/Major Mvmt NBT EBLn1 SBT SBR
Capacity (veh/h) - 211 - -
HCM Lane V/C Ratio - 0.09 - -
HCM Ctrl Dly (s/v) - 23.7 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.3 - -
f ** **t
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 29 1017 11 3 1518 24 14 2 2 50 0 52 Future Volume (veh/h) 29 1017 11 3 1518 24 14 2 2 50 0 52 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 32 1105 12 3 1650 26 15 2 2 54 0 57 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 69 2515 27 7 2322 37 390 53 31 250 44 155
Arrive On Green 0.04 0.48 0.48 0.00 0.44 0.44 0.19 0.19 0.19 0.19 0.00 0.19 Sat Flow, veh/h 1810 5290 57 1810 5258 83 1112 275 163 540 228 811 Grp Volume(v), veh/h 32 722 395 3 1085 591 19 0 0 111 0 0 Grp Sat Flow(s),veh/h/ln 1810 1729 1890 1810 1729 1883 1550 0 0 1579 0 0 Q Serve(g_s), s 0.6 5.1 5.1 0.1 9.3 9.3 0.0 0.0 0.0 0.1 0.0 0.0 Cycle Q Clear(g_c), s 0.6 5.1 5.1 0.1 9.3 9.3 0.3 0.0 0.0 2.0 0.0 0.0 Prop In Lane 1.00 0.03 1.00 0.04 0.79 0.11 0.49 0.51
Lane Grp Cap(c), veh/h 69 1644 898 7 1527 831 474 0 0 449 0 0 V/C Ratio(X) 0.47 0.44 0.44 0.40 0.71 0.71 0.04 0.00 0.00 0.25 0.00 0.00 Avail Cap(c_a), veh/h 248 1705 932 248 1705 928 1180 0 0 1199 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 17.2 6.3 6.3 18.1 8.3 8.3 12.0 0.0 0.0 12.7 0.0 0.0 Incr Delay (d2), s/veh 4.8 0.2 0.3 31.7 1.2 2.2 0.0 0.0 0.0 0.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.7 0.8 0.1 1.7 2.1 0.1 0.0 0.0 0.6 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 22.0 6.5 6.7 49.9 9.5 10.5 12.1 0.0 0.0 13.0 0.0 0.0 LnGrp LOS C A A D A B B B
Approach Vol, veh/h 1149 1679 19 111
Approach Delay, s/veh 7.0 10.0 12.1 13.0
Approach LOS A A B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.1 21.4 11.0 5.4 20.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.3 2.1 7.1 4.0 2.6 11.3
Green Ext Time (p_c), s 0.0 0.0 4.8 0.5 0.0 4.8
Intersection Summary
HCM 7th Control Delay, s/veh 8.9
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/28/2025
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 299 746 383 244 1016 244 403 1481 197 250 1256 227 Future Volume (veh/h) 299 746 383 244 1016 244 403 1481 197 250 1256 227 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 308 769 395 252 1047 252 415 1527 203 258 1295 234 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 346 1456 446 283 1363 561 470 1780 676 315 1550 634 Arrive On Green 0.11 0.30 0.30 0.09 0.28 0.28 0.14 0.37 0.37 0.10 0.32 0.32 Sat Flow, veh/h 3291 4863 1490 3291 4863 1488 3291 4863 1491 3291 4863 1491 Grp Volume(v), veh/h 308 769 395 252 1047 252 415 1527 203 258 1295 234 Grp Sat Flow(s),veh/h/ln 1646 1621 1490 1646 1621 1488 1646 1621 1491 1646 1621 1491 Q Serve(g_s), s 9.7 13.8 26.4 7.9 20.7 13.3 12.9 30.4 9.0 8.0 25.9 11.2 Cycle Q Clear(g_c), s 9.7 13.8 26.4 7.9 20.7 13.3 12.9 30.4 9.0 8.0 25.9 11.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 346 1456 446 283 1363 561 470 1780 676 315 1550 634 V/C Ratio(X) 0.89 0.53 0.88 0.89 0.77 0.45 0.88 0.86 0.30 0.82 0.84 0.37 Avail Cap(c_a), veh/h 346 1580 484 283 1487 599 472 1905 714 315 1673 671 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 46.2 30.5 34.9 47.3 34.5 24.5 44.0 30.6 18.2 46.4 33.1 20.6 Incr Delay (d2), s/veh 23.6 0.3 16.7 27.4 2.3 0.6 17.5 4.0 0.2 15.7 3.6 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.9 5.1 11.0 4.2 7.9 4.4 6.1 11.4 0.0 3.8 9.8 3.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 69.9 30.8 51.6 74.8 36.8 25.1 61.5 34.6 18.4 62.2 36.7 21.0 LnGrp LOS E C D E D C E C B E D C
Approach Vol, veh/h 1472 1551 2145 1787
Approach Delay, s/veh 44.6 41.1 38.3 38.3
Approach LOS D D D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.0 42.3 13.0 35.3 19.0 37.4 15.0 33.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 41.0 9.0 34.0 15.0 36.0 11.0 32.0 Max Q Clear Time (g_c+I1), s 10.0 32.4 9.9 28.4 14.9 27.9 11.7 22.7 Green Ext Time (p_c), s 0.0 5.9 0.0 2.9 0.0 5.1 0.0 4.9 Intersection Summary
HCM 7th Control Delay, s/veh 40.2
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Rosedale Highway & NW Promenade 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 149 1237 1358 134 167 106
Future Volume (veh/h) 149 1237 1358 134 167 106
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 154 1275 1400 138 172 109
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 359 3287 2239 694 586 269
Arrive On Green 0.10 0.63 0.43 0.43 0.17 0.17
Sat Flow, veh/h 3510 5358 5358 1608 3510 1610
Grp Volume(v), veh/h 154 1275 1400 138 172 109
Grp Sat Flow(s),veh/h/ln 1755 1729 1729 1608 1755 1610
Q Serve(g_s), s 1.7 4.8 8.4 2.1 1.7 2.4
Cycle Q Clear(g_c), s 1.7 4.8 8.4 2.1 1.7 2.4
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 359 3287 2239 694 586 269
V/C Ratio(X) 0.43 0.39 0.63 0.20 0.29 0.41
Avail Cap(c_a), veh/h 438 4009 2845 882 2713 1244
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 16.9 3.6 8.9 7.1 14.6 14.9
Incr Delay (d2), s/veh 0.8 0.1 0.3 0.1 0.3 1.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 0.2 1.7 0.0 0.6 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.7 3.6 9.2 7.2 14.9 15.9
LnGrp LOS B A A A B B
Approach Vol, veh/h 1429 1538 281
Approach Delay, s/veh 5.2 9.0 15.3
Approach LOS A A B
Timer - Assigned Phs 4 6 7 8
Phs Duration (G+Y+Rc), s 29.4 10.7 8.1 21.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 31.0 5.0 22.0
Max Q Clear Time (g_c+I1), s 6.8 4.4 3.7 10.4
Green Ext Time (p_c), s 8.9 0.9 0.1 6.9
Intersection Summary
HCM 7th Control Delay, s/veh 7.8
HCM 7th LOS A
" +++ 1 7 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 146 1228 140 59 1414 145 139 50 32 221 66 156 Future Volume (veh/h) 146 1228 140 59 1414 145 139 50 32 221 66 156 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 149 1253 143 60 1443 148 142 51 33 226 67 159 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 279 2176 676 97 2043 634 276 528 234 348 603 264 Arrive On Green 0.08 0.42 0.42 0.05 0.39 0.39 0.08 0.15 0.15 0.10 0.17 0.17 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1600 3510 3610 1578 Grp Volume(v), veh/h 149 1253 143 60 1443 148 142 51 33 226 67 159 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1600 1755 1805 1578 Q Serve(g_s), s 2.3 10.5 3.2 1.8 13.3 3.5 2.2 0.7 1.0 3.5 0.9 5.3 Cycle Q Clear(g_c), s 2.3 10.5 3.2 1.8 13.3 3.5 2.2 0.7 1.0 3.5 0.9 5.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 279 2176 676 97 2043 634 276 528 234 348 603 264 V/C Ratio(X) 0.53 0.58 0.21 0.62 0.71 0.23 0.52 0.10 0.14 0.65 0.11 0.60 Avail Cap(c_a), veh/h 308 2459 763 159 2459 763 308 2029 899 616 2346 1025 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 25.2 12.6 10.5 26.4 14.5 11.5 25.2 21.0 21.2 24.7 20.1 22.0 Incr Delay (d2), s/veh 1.6 0.3 0.2 6.2 0.7 0.2 1.5 0.1 0.3 2.0 0.1 2.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 3.0 0.9 0.9 4.0 1.0 0.9 0.3 0.3 1.4 0.3 1.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 26.8 12.9 10.7 32.6 15.2 11.7 26.7 21.1 21.5 26.7 20.2 24.2 LnGrp LOS C B B C B B C C C C C C
Approach Vol, veh/h 1545 1651 226 452
Approach Delay, s/veh 14.0 15.5 24.7 24.9
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.7 12.3 7.1 27.9 8.5 13.5 8.5 26.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 32.0 5.0 27.0 5.0 37.0 5.0 27.0 Max Q Clear Time (g_c+I1), s 5.5 3.0 3.8 12.5 4.2 7.3 4.3 15.3 Green Ext Time (p_c), s 0.3 0.3 0.0 7.2 0.0 0.9 0.0 7.1 Intersection Summary
HCM 7th Control Delay, s/veh 16.6
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 241 970 365 272 665 184 323 1095 413 179 916 210 Future Volume (veh/h) 241 970 365 272 665 184 323 1095 413 179 916 210 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 243 980 369 275 672 186 326 1106 417 181 925 212 Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 225 1506 467 263 1562 484 338 1746 541 255 1130 497 Arrive On Green 0.07 0.31 0.31 0.08 0.32 0.32 0.10 0.36 0.36 0.08 0.33 0.33 Sat Flow, veh/h 3319 4904 1519 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 243 980 369 275 672 186 326 1106 417 181 925 212 Grp Sat Flow(s),veh/h/ln 1659 1635 1519 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 6.0 15.3 19.7 7.0 9.6 8.4 8.7 16.6 21.5 4.7 22.0 9.7 Cycle Q Clear(g_c), s 6.0 15.3 19.7 7.0 9.6 8.4 8.7 16.6 21.5 4.7 22.0 9.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 225 1506 467 263 1562 484 338 1746 541 255 1130 497 V/C Ratio(X) 1.08 0.65 0.79 1.05 0.43 0.38 0.97 0.63 0.77 0.71 0.82 0.43 Avail Cap(c_a), veh/h 225 1774 550 263 1830 567 338 1940 602 375 1389 611 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.2 26.5 28.0 40.7 23.8 23.4 39.6 23.7 25.3 39.9 27.2 23.0 Incr Delay (d2), s/veh 82.7 0.7 6.6 68.4 0.2 0.5 39.6 0.6 5.5 3.6 3.3 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.9 5.5 7.3 5.2 3.4 2.8 5.2 5.8 7.7 1.9 8.5 3.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 123.9 27.2 34.6 109.1 24.0 23.9 79.2 24.3 30.8 43.5 30.4 23.6 LnGrp LOS F C C F C C E C C D C C
Approach Vol, veh/h 1592 1133 1849 1318
Approach Delay, s/veh 43.7 44.6 35.4 31.1
Approach LOS D D D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.8 35.5 11.0 31.2 13.0 33.3 10.0 32.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 35.0 7.0 32.0 9.0 36.0 6.0 33.0 Max Q Clear Time (g_c+I1), s 6.7 18.6 9.0 21.7 10.7 24.0 8.0 11.6 Green Ext Time (p_c), s 0.2 4.8 0.0 5.3 0.0 5.1 0.0 4.7 Intersection Summary
HCM 7th Control Delay, s/veh 38.5
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 111 779 20 36 1037 297 47 38 38 198 46 114 Future Volume (veh/h) 111 779 20 36 1037 297 47 38 38 198 46 114 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 116 811 21 38 1080 309 49 40 40 206 48 119 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 149 2050 633 72 1273 565 86 264 222 259 445 376 Arrive On Green 0.08 0.40 0.40 0.04 0.35 0.35 0.05 0.14 0.14 0.14 0.23 0.23 Sat Flow, veh/h 1810 5187 1602 1810 3610 1601 1810 1900 1600 1810 1900 1604 Grp Volume(v), veh/h 116 811 21 38 1080 309 49 40 40 206 48 119 Grp Sat Flow(s),veh/h/ln 1810 1729 1602 1810 1805 1601 1810 1900 1600 1810 1900 1604 Q Serve(g_s), s 3.6 6.3 0.5 1.2 15.6 8.7 1.5 1.0 1.2 6.2 1.1 3.5 Cycle Q Clear(g_c), s 3.6 6.3 0.5 1.2 15.6 8.7 1.5 1.0 1.2 6.2 1.1 3.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 149 2050 633 72 1273 565 86 264 222 259 445 376 V/C Ratio(X) 0.78 0.40 0.03 0.53 0.85 0.55 0.57 0.15 0.18 0.80 0.11 0.32 Avail Cap(c_a), veh/h 160 2050 633 160 1405 623 160 841 708 384 1076 908 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 25.4 12.2 10.5 26.6 16.9 14.7 26.3 21.4 21.5 23.4 17.0 17.9 Incr Delay (d2), s/veh 20.1 0.1 0.0 5.9 4.7 0.8 5.8 0.3 0.4 6.9 0.1 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 1.8 0.1 0.6 5.7 2.6 0.7 0.4 0.4 2.9 0.5 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 45.5 12.4 10.5 32.5 21.6 15.5 32.2 21.7 21.9 30.3 17.1 18.4 LnGrp LOS D B B C C B C C C C B B
Approach Vol, veh/h 948 1427 129 373
Approach Delay, s/veh 16.4 20.6 25.7 24.8
Approach LOS B C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 12.1 11.8 6.2 26.3 6.7 17.2 8.7 23.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 12.0 25.0 5.0 22.0 5.0 32.0 5.0 22.0 Max Q Clear Time (g_c+I1), s 8.2 3.2 3.2 8.3 3.5 5.5 5.6 17.6 Green Ext Time (p_c), s 0.2 0.2 0.0 4.2 0.0 0.6 0.0 2.3 Intersection Summary
HCM 7th Control Delay, s/veh 20.0
HCM 7th LOS B
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 19 803 83 148 760 17 110 32 143 43 18 3 Future Volume (veh/h) 19 803 83 148 760 17 110 32 143 43 18 3 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 20 836 86 154 792 18 115 33 149 45 19 3 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 44 1137 491 191 1431 633 149 367 310 85 301 250 Arrive On Green 0.02 0.32 0.32 0.11 0.40 0.40 0.08 0.19 0.19 0.05 0.16 0.16 Sat Flow, veh/h 1810 3610 1559 1810 3610 1598 1810 1900 1605 1810 1900 1583 Grp Volume(v), veh/h 20 836 86 154 792 18 115 33 149 45 19 3 Grp Sat Flow(s),veh/h/ln 1810 1805 1559 1810 1805 1598 1810 1900 1605 1810 1900 1583 Q Serve(g_s), s 0.5 9.8 1.9 3.9 8.0 0.3 2.9 0.7 3.9 1.1 0.4 0.1 Cycle Q Clear(g_c), s 0.5 9.8 1.9 3.9 8.0 0.3 2.9 0.7 3.9 1.1 0.4 0.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 44 1137 491 191 1431 633 149 367 310 85 301 250 V/C Ratio(X) 0.45 0.74 0.18 0.80 0.55 0.03 0.77 0.09 0.48 0.53 0.06 0.01 Avail Cap(c_a), veh/h 191 1451 627 191 1451 642 191 1005 849 191 1005 837 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.7 14.4 11.7 20.7 11.0 8.7 21.2 15.6 16.9 22.0 16.9 16.8 Incr Delay (d2), s/veh 7.1 1.5 0.2 21.5 0.4 0.0 13.4 0.1 1.2 5.0 0.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 3.1 0.5 2.5 2.2 0.1 1.6 0.3 1.2 0.5 0.2 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.8 15.9 11.9 42.2 11.5 8.7 34.7 15.8 18.1 27.0 17.0 16.8 LnGrp LOS C B B D B A C B B C B B
Approach Vol, veh/h 942 964 297 67
Approach Delay, s/veh 15.8 16.3 24.3 23.7
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.2 13.1 9.0 18.9 7.9 11.5 5.2 22.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 25.0 5.0 19.0 5.0 25.0 5.0 19.0 Max Q Clear Time (g_c+I1), s 3.1 5.9 5.9 11.8 4.9 2.4 2.5 10.0 Green Ext Time (p_c), s 0.0 0.5 0.0 2.8 0.0 0.0 0.0 3.2 Intersection Summary
HCM 7th Control Delay, s/veh 17.4
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 267 2 642 511 523 542 316 1419 16 4 1781 306 Future Volume (veh/h) 267 2 642 511 523 542 316 1419 16 4 1781 306 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 276 0 662 597 441 559 326 1463 16 4 1836 315 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 562 0 499 815 428 724 327 2429 27 9 1925 597 Arrive On Green 0.16 0.00 0.16 0.23 0.23 0.23 0.10 0.47 0.47 0.01 0.38 0.38 Sat Flow, veh/h 3506 0 3114 3506 1841 3116 3401 5125 56 1753 5025 1559 Grp Volume(v), veh/h 276 0 662 597 441 559 326 956 523 4 1836 315 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1831 1753 1675 1559 Q Serve(g_s), s 9.0 0.0 20.0 19.7 29.0 20.9 12.0 26.2 26.2 0.3 44.3 19.5 Cycle Q Clear(g_c), s 9.0 0.0 20.0 19.7 29.0 20.9 12.0 26.2 26.2 0.3 44.3 19.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.03 1.00 1.00
Lane Grp Cap(c), veh/h 562 0 499 815 428 724 327 1588 868 9 1925 597 V/C Ratio(X) 0.49 0.00 1.33 0.73 1.03 0.77 1.00 0.60 0.60 0.44 0.95 0.53 Avail Cap(c_a), veh/h 562 0 499 815 428 724 327 1588 868 70 1933 599 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 47.8 0.0 52.4 44.3 47.9 44.8 56.4 24.2 24.2 61.9 37.4 29.8 Incr Delay (d2), s/veh 0.7 0.0 160.4 3.4 51.8 5.2 48.9 0.6 1.2 30.0 11.5 0.9 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.8 0.0 18.6 8.6 18.9 8.3 7.1 9.7 10.7 0.2 18.8 7.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 48.4 0.0 212.9 47.7 99.7 50.0 105.3 24.8 25.3 91.9 48.9 30.6 LnGrp LOS D F D F D F C C F D C
Approach Vol, veh/h 938 1597 1805 2155
Approach Delay, s/veh 164.5 62.9 39.5 46.3
Approach LOS F E D D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.6 63.2 24.0 16.0 51.8 33.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 55.0 20.0 12.0 48.0 29.0 Max Q Clear Time (g_c+I1), s 2.3 28.2 22.0 14.0 46.3 31.0 Green Ext Time (p_c), s 0.0 10.2 0.0 0.0 1.5 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 65.5
HCM 7th LOS E
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 600 58 71 929 51 50
Future Volume (veh/h) 600 58 71 929 51 50
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 645 62 76 999 55 54
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1181 113 144 2077 122 120
Arrive On Green 0.35 0.35 0.08 0.58 0.14 0.14
Sat Flow, veh/h 3422 319 1810 3705 853 838
Grp Volume(v), veh/h 350 357 76 999 110 0
Grp Sat Flow(s),veh/h/ln 1805 1841 1810 1805 1707 0
Q Serve(g_s), s 4.4 4.4 1.1 4.6 1.7 0.0
Cycle Q Clear(g_c), s 4.4 4.4 1.1 4.6 1.7 0.0
Prop In Lane 0.17 1.00 0.50 0.49
Lane Grp Cap(c), veh/h 641 653 144 2077 244 0
V/C Ratio(X) 0.55 0.55 0.53 0.48 0.45 0.00
Avail Cap(c_a), veh/h 1526 1556 510 4578 962 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 7.3 7.3 12.6 3.5 11.1 0.0
Incr Delay (d2), s/veh 0.7 0.7 3.0 0.2 1.3 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 0.7 0.4 0.1 0.5 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 8.1 8.0 15.6 3.7 12.4 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 707 1075 110
Approach Delay, s/veh 8.0 4.6 12.4
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 8.1 6.3 14.1 20.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 8.0 24.0 36.0
Max Q Clear Time (g_c+I1), s 3.7 3.1 6.4 6.6
Green Ext Time (p_c), s 0.2 0.0 3.5 7.1
Intersection Summary
HCM 7th Control Delay, s/veh 6.3
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 194 265 168 178 383 289 222 1384 116 206 1277 159 Future Volume (veh/h) 194 265 168 178 383 289 222 1384 116 206 1277 159 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 202 276 175 185 399 301 231 1442 121 215 1330 166 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 294 952 735 271 929 413 323 1781 545 334 1797 557 Arrive On Green 0.08 0.26 0.26 0.08 0.26 0.26 0.09 0.34 0.34 0.10 0.35 0.35 Sat Flow, veh/h 3510 3610 2785 3510 3610 1603 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 202 276 175 185 399 301 231 1442 121 215 1330 166 Grp Sat Flow(s),veh/h/ln 1755 1805 1392 1755 1805 1603 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 4.1 4.4 3.6 3.7 6.7 12.5 4.6 18.4 3.9 4.3 16.4 5.5 Cycle Q Clear(g_c), s 4.1 4.4 3.6 3.7 6.7 12.5 4.6 18.4 3.9 4.3 16.4 5.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 294 952 735 271 929 413 323 1781 545 334 1797 557 V/C Ratio(X) 0.69 0.29 0.24 0.68 0.43 0.73 0.72 0.81 0.22 0.64 0.74 0.30 Avail Cap(c_a), veh/h 387 1691 1304 290 1591 706 387 1929 590 339 1858 576 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.3 21.3 21.0 32.6 22.5 24.6 32.0 21.7 16.9 31.7 20.8 17.3 Incr Delay (d2), s/veh 3.3 0.2 0.2 5.9 0.3 2.5 5.0 2.5 0.2 4.1 1.6 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.7 1.7 1.0 1.7 2.6 4.4 2.0 6.7 1.3 1.8 5.9 1.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.6 21.5 21.2 38.5 22.8 27.1 37.0 24.2 17.1 35.7 22.4 17.6 LnGrp LOS D C C D C C D C B D C B
Approach Vol, veh/h 653 885 1794 1711
Approach Delay, s/veh 25.8 27.6 25.4 23.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.9 28.9 9.6 23.2 10.7 29.2 10.1 22.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 27.0 6.0 34.0 8.0 26.0 8.0 32.0 Max Q Clear Time (g_c+I1), s 6.3 20.4 5.7 6.4 6.6 18.4 6.1 14.5 Green Ext Time (p_c), s 0.0 4.6 0.0 2.3 0.1 4.9 0.1 3.1 Intersection Summary
HCM 7th Control Delay, s/veh 25.2
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 517 27 59 699 30 35 3 80 14 4 11 Future Volume (veh/h) 10 517 27 59 699 30 35 3 80 14 4 11 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 11 568 30 65 768 33 38 3 88 15 4 12 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 36 993 427 154 1198 51 253 20 242 125 33 100 Arrive On Green 0.02 0.27 0.27 0.09 0.34 0.34 0.15 0.15 0.15 0.15 0.15 0.15 Sat Flow, veh/h 1810 3610 1554 1810 3521 151 1683 133 1607 840 224 672 Grp Volume(v), veh/h 11 568 30 65 394 407 41 0 88 31 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1554 1810 1805 1867 1816 0 1607 1735 0 0 Q Serve(g_s), s 0.3 6.4 0.7 1.6 8.6 8.7 0.9 0.0 2.3 0.7 0.0 0.0 Cycle Q Clear(g_c), s 0.3 6.4 0.7 1.6 8.6 8.7 0.9 0.0 2.3 0.7 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.08 0.93 1.00 0.48 0.39
Lane Grp Cap(c), veh/h 36 993 427 154 614 635 273 0 242 258 0 0 V/C Ratio(X) 0.31 0.57 0.07 0.42 0.64 0.64 0.15 0.00 0.36 0.12 0.00 0.00 Avail Cap(c_a), veh/h 269 2150 926 269 1075 1112 850 0 752 258 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 22.7 14.7 12.6 20.4 13.1 13.1 17.3 0.0 17.9 17.3 0.0 0.0 Incr Delay (d2), s/veh 4.7 0.5 0.1 1.8 1.1 1.1 0.3 0.0 0.9 0.2 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 2.0 0.2 0.6 2.6 2.7 0.3 0.0 0.7 0.3 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.4 15.2 12.7 22.2 14.2 14.2 17.6 0.0 18.9 17.5 0.0 0.0 LnGrp LOS C B B C B B B B B
Approach Vol, veh/h 609 866 129 31
Approach Delay, s/veh 15.3 14.8 18.5 17.5
Approach LOS B B B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.1 8.0 16.9 11.0 4.9 20.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 22.0 7.0 28.0 7.0 7.0 28.0
Max Q Clear Time (g_c+I1), s 4.3 3.6 8.4 2.7 2.3 10.7
Green Ext Time (p_c), s 0.4 0.0 3.3 0.0 0.0 4.1
Intersection Summary
HCM 7th Control Delay, s/veh 15.3
HCM 7th LOS B
h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 24 271 161 242 310 84 159 174 192 51 98 13 Future Volume (veh/h) 24 271 161 242 310 84 159 174 192 51 98 13 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.93 1.00 0.91 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 25 282 168 252 323 88 166 181 200 53 102 14 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 70 558 249 349 777 346 258 855 672 117 712 98 Arrive On Green 0.04 0.15 0.15 0.10 0.22 0.22 0.07 0.45 0.45 0.06 0.44 0.44 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1493 1810 1614 222 Grp Volume(v), veh/h 25 282 168 252 323 88 166 181 200 53 0 116 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1493 1810 0 1836 Q Serve(g_s), s 0.9 5.0 6.8 4.8 5.3 3.1 3.2 4.0 5.9 2.0 0.0 2.6 Cycle Q Clear(g_c), s 0.9 5.0 6.8 4.8 5.3 3.1 3.2 4.0 5.9 2.0 0.0 2.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.12
Lane Grp Cap(c), veh/h 70 558 249 349 777 346 258 855 672 117 0 810 V/C Ratio(X) 0.36 0.51 0.68 0.72 0.42 0.25 0.64 0.21 0.30 0.45 0.00 0.14 Avail Cap(c_a), veh/h 183 1306 583 406 1358 606 406 935 735 183 0 877 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 32.4 26.8 27.6 30.2 23.4 22.5 31.1 11.6 12.1 31.1 0.0 11.5 Incr Delay (d2), s/veh 3.1 0.7 3.2 5.2 0.4 0.4 2.7 0.1 0.2 2.7 0.0 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 2.0 2.6 2.1 2.0 1.1 1.3 1.4 1.6 0.9 0.0 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.5 27.5 30.8 35.4 23.7 22.9 33.8 11.7 12.3 33.9 0.0 11.6 LnGrp LOS D C C D C C C B B C B
Approach Vol, veh/h 475 663 547 169
Approach Delay, s/veh 29.1 28.1 18.6 18.6
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.5 35.1 10.9 14.7 9.1 34.5 6.7 18.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 34.0 8.0 25.0 8.0 33.0 7.0 26.0 Max Q Clear Time (g_c+I1), s 4.0 7.9 6.8 8.8 5.2 4.6 2.9 7.3 Green Ext Time (p_c), s 0.0 1.6 0.1 1.9 0.1 0.5 0.0 1.9 Intersection Summary
HCM 7th Control Delay, s/veh 24.7
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 41 344 44 54 335 93 37 33 54 112 31 52 Future Volume (veh/h) 41 344 44 54 335 93 37 33 54 112 31 52 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 42 355 45 56 345 96 38 34 56 115 32 54 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 86 758 336 107 800 354 153 400 337 327 494 412 Arrive On Green 0.05 0.21 0.21 0.06 0.22 0.22 0.04 0.21 0.21 0.09 0.26 0.26 Sat Flow, veh/h 1810 3610 1599 1810 3610 1599 3510 1900 1603 3510 1900 1584 Grp Volume(v), veh/h 42 355 45 56 345 96 38 34 56 115 32 54 Grp Sat Flow(s),veh/h/ln 1810 1805 1599 1810 1805 1599 1755 1900 1603 1755 1900 1584 Q Serve(g_s), s 0.8 3.2 0.9 1.1 3.1 1.9 0.4 0.5 1.1 1.1 0.5 1.0 Cycle Q Clear(g_c), s 0.8 3.2 0.9 1.1 3.1 1.9 0.4 0.5 1.1 1.1 0.5 1.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 86 758 336 107 800 354 153 400 337 327 494 412 V/C Ratio(X) 0.49 0.47 0.13 0.52 0.43 0.27 0.25 0.09 0.17 0.35 0.06 0.13 Avail Cap(c_a), veh/h 290 2508 1111 338 2604 1154 469 1777 1499 563 1827 1524 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.4 13.0 12.0 17.1 12.5 12.1 17.3 11.9 12.1 15.9 10.4 10.6 Incr Delay (d2), s/veh 4.3 0.5 0.2 4.0 0.4 0.4 0.8 0.1 0.2 0.6 0.1 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.9 0.2 0.5 0.9 0.5 0.1 0.2 0.3 0.4 0.1 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.7 13.4 12.2 21.1 12.9 12.5 18.1 12.0 12.3 16.6 10.5 10.8 LnGrp LOS C B B C B B B B B B B B
Approach Vol, veh/h 442 497 128 201
Approach Delay, s/veh 14.1 13.7 14.0 14.0
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.5 11.9 6.2 11.9 5.6 13.7 5.8 12.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 35.0 7.0 26.0 5.0 36.0 6.0 27.0 Max Q Clear Time (g_c+I1), s 3.1 3.1 3.1 5.2 2.4 3.0 2.8 5.1 Green Ext Time (p_c), s 0.1 0.3 0.0 2.0 0.0 0.3 0.0 2.2 Intersection Summary
HCM 7th Control Delay, s/veh 13.9
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 39 141 205 101 232 143 443 1286 156 151 1027 64 Future Volume (veh/h) 39 141 205 101 232 143 443 1286 156 151 1027 64 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 40 144 209 103 237 146 452 1312 159 154 1048 65 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 143 668 297 241 1105 338 570 2075 636 272 1634 500 Arrive On Green 0.04 0.18 0.18 0.07 0.21 0.21 0.16 0.40 0.40 0.08 0.32 0.32 Sat Flow, veh/h 3510 3610 1608 3510 5187 1585 3510 5187 1589 3510 5187 1588 Grp Volume(v), veh/h 40 144 209 103 237 146 452 1312 159 154 1048 65 Grp Sat Flow(s),veh/h/ln 1755 1805 1608 1755 1729 1585 1755 1729 1589 1755 1729 1588 Q Serve(g_s), s 0.7 2.0 7.2 1.7 2.2 4.8 7.4 12.1 4.0 2.5 10.3 1.7 Cycle Q Clear(g_c), s 0.7 2.0 7.2 1.7 2.2 4.8 7.4 12.1 4.0 2.5 10.3 1.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 143 668 297 241 1105 338 570 2075 636 272 1634 500 V/C Ratio(X) 0.28 0.22 0.70 0.43 0.21 0.43 0.79 0.63 0.25 0.57 0.64 0.13 Avail Cap(c_a), veh/h 295 2002 891 354 2963 906 649 3051 934 295 2528 774 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.7 20.6 22.7 26.6 19.3 20.3 24.0 14.3 11.9 26.5 17.5 14.6 Incr Delay (d2), s/veh 1.1 0.2 3.0 1.2 0.1 0.9 6.0 0.3 0.2 2.1 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.7 2.6 0.7 0.8 1.6 3.1 3.7 1.1 1.0 3.4 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 28.8 20.7 25.7 27.8 19.4 21.2 29.9 14.7 12.1 28.6 17.9 14.7 LnGrp LOS C C C C B C C B B C B B
Approach Vol, veh/h 393 486 1923 1267
Approach Delay, s/veh 24.2 21.7 18.0 19.1
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.6 27.8 8.1 15.0 13.7 22.8 6.4 16.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 6.0 33.0 11.0 29.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 4.5 14.1 3.7 9.2 9.4 12.3 2.7 6.8 Green Ext Time (p_c), s 0.0 9.3 0.0 1.4 0.3 6.3 0.0 1.8 Intersection Summary
HCM 7th Control Delay, s/veh 19.4
HCM 7th LOS B
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 42 463 145 194 827 43 243 673 185 68 643 83 Future Volume (veh/h) 42 463 145 194 827 43 243 673 185 68 643 83 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 44 487 153 204 871 45 256 708 195 72 677 87 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 151 1060 472 308 1181 61 361 1085 481 202 1324 408 Arrive On Green 0.04 0.29 0.29 0.09 0.34 0.34 0.10 0.30 0.30 0.06 0.26 0.26 Sat Flow, veh/h 3510 3610 1607 3510 3492 180 3510 3610 1599 3510 5187 1597 Grp Volume(v), veh/h 44 487 153 204 450 466 256 708 195 72 677 87 Grp Sat Flow(s),veh/h/ln 1755 1805 1607 1755 1805 1867 1755 1805 1599 1755 1729 1597 Q Serve(g_s), s 0.7 6.8 4.6 3.5 13.5 13.5 4.3 10.5 6.0 1.2 6.9 2.6 Cycle Q Clear(g_c), s 0.7 6.8 4.6 3.5 13.5 13.5 4.3 10.5 6.0 1.2 6.9 2.6 Prop In Lane 1.00 1.00 1.00 0.10 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 151 1060 472 308 611 632 361 1085 481 202 1324 408 V/C Ratio(X) 0.29 0.46 0.32 0.66 0.74 0.74 0.71 0.65 0.41 0.36 0.51 0.21 Avail Cap(c_a), veh/h 286 1705 759 400 911 943 400 1940 859 286 2618 806 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.5 17.7 16.9 27.1 17.9 17.9 26.7 18.7 17.1 27.8 19.6 18.0 Incr Delay (d2), s/veh 1.1 0.3 0.4 2.6 1.8 1.7 5.1 0.7 0.6 1.1 0.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.5 1.5 1.4 5.1 5.2 1.8 3.6 2.0 0.5 2.3 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.5 18.0 17.3 29.8 19.7 19.6 31.8 19.4 17.7 28.9 19.9 18.3 LnGrp LOS C B B C B B C B B C B B
Approach Vol, veh/h 684 1120 1159 836
Approach Delay, s/veh 18.6 21.5 21.8 20.5
Approach LOS B C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.5 22.5 9.4 22.0 10.3 19.7 6.6 24.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 33.0 7.0 29.0 7.0 31.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 3.2 12.5 5.5 8.8 6.3 8.9 2.7 15.5 Green Ext Time (p_c), s 0.0 4.7 0.1 3.4 0.1 4.3 0.0 4.9 Intersection Summary
HCM 7th Control Delay, s/veh 20.8
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 123 498 135 185 699 87 341 942 207 149 783 115 Future Volume (veh/h) 123 498 135 185 699 87 341 942 207 149 783 115 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 128 519 141 193 728 91 355 981 216 155 816 120 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 247 1454 444 275 1496 451 459 1643 510 258 1346 417 Arrive On Green 0.07 0.28 0.28 0.08 0.29 0.29 0.13 0.32 0.32 0.07 0.26 0.26 Sat Flow, veh/h 3510 5187 1583 3510 5187 1562 3510 5187 1609 3510 5187 1608 Grp Volume(v), veh/h 128 519 141 193 728 91 355 981 216 155 816 120 Grp Sat Flow(s),veh/h/ln 1755 1729 1583 1755 1729 1562 1755 1729 1609 1755 1729 1608 Q Serve(g_s), s 2.2 5.1 4.5 3.4 7.4 2.8 6.2 10.2 6.8 2.7 8.8 3.8 Cycle Q Clear(g_c), s 2.2 5.1 4.5 3.4 7.4 2.8 6.2 10.2 6.8 2.7 8.8 3.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 247 1454 444 275 1496 451 459 1643 510 258 1346 417 V/C Ratio(X) 0.52 0.36 0.32 0.70 0.49 0.20 0.77 0.60 0.42 0.60 0.61 0.29 Avail Cap(c_a), veh/h 275 2523 770 275 2523 760 496 2848 883 441 2767 858 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.6 18.3 18.1 28.6 18.8 17.1 26.8 18.3 17.2 28.6 20.7 18.9 Incr Delay (d2), s/veh 1.7 0.1 0.4 7.7 0.2 0.2 7.0 0.3 0.6 2.2 0.4 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 1.8 1.4 1.6 2.5 0.9 2.7 3.3 2.1 1.1 3.0 1.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.3 18.5 18.5 36.3 19.0 17.4 33.8 18.7 17.7 30.9 21.2 19.3 LnGrp LOS C B B D B B C B B C C B
Approach Vol, veh/h 788 1012 1552 1091
Approach Delay, s/veh 20.4 22.2 22.0 22.3
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.7 24.2 9.0 21.9 12.3 20.5 8.5 22.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 35.0 5.0 31.0 9.0 34.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 4.7 12.2 5.4 7.1 8.2 10.8 4.2 9.4 Green Ext Time (p_c), s 0.1 7.0 0.0 3.7 0.1 5.4 0.0 4.8 Intersection Summary
HCM 7th Control Delay, s/veh 21.8
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/28/2025 Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 67 67 201 252 124 78 231 1250 191 24 1067 29 Future Volume (veh/h) 67 67 201 252 124 78 231 1250 191 24 1067 29 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 69 69 207 260 128 80 238 1289 197 25 1100 30 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 97 350 289 304 568 472 282 1753 268 50 1340 414 Arrive On Green 0.05 0.18 0.18 0.17 0.30 0.30 0.16 0.39 0.39 0.03 0.26 0.26 Sat Flow, veh/h 1810 1900 1571 1810 1900 1579 1810 4538 693 1810 5187 1604 Grp Volume(v), veh/h 69 69 207 260 128 80 238 982 504 25 1100 30 Grp Sat Flow(s),veh/h/ln 1810 1900 1571 1810 1900 1579 1810 1729 1773 1810 1729 1604 Q Serve(g_s), s 2.6 2.1 8.5 9.5 3.5 2.6 8.7 16.7 16.7 0.9 13.7 1.0 Cycle Q Clear(g_c), s 2.6 2.1 8.5 9.5 3.5 2.6 8.7 16.7 16.7 0.9 13.7 1.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.39 1.00 1.00
Lane Grp Cap(c), veh/h 97 350 289 304 568 472 282 1336 685 50 1340 414 V/C Ratio(X) 0.71 0.20 0.72 0.85 0.23 0.17 0.84 0.74 0.74 0.50 0.82 0.07 Avail Cap(c_a), veh/h 212 611 505 317 722 600 291 1336 685 132 1440 445 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.9 23.6 26.2 27.6 18.0 17.7 28.1 18.0 18.0 32.8 23.9 19.2 Incr Delay (d2), s/veh 9.4 0.3 3.3 19.2 0.2 0.2 19.5 2.2 4.1 7.5 3.7 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 0.9 3.1 5.3 1.4 0.8 4.8 5.6 6.2 0.5 5.1 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 41.2 23.9 29.5 46.9 18.2 17.9 47.5 20.1 22.1 40.3 27.6 19.3 LnGrp LOS D C C D B B D C C D C B
Approach Vol, veh/h 345 468 1724 1155
Approach Delay, s/veh 30.8 34.1 24.5 27.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 5.9 30.4 15.5 16.6 14.6 21.7 7.7 24.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 25.0 12.0 22.0 11.0 19.0 8.0 26.0 Max Q Clear Time (g_c+I1), s 2.9 18.7 11.5 10.5 10.7 15.7 4.6 5.5 Green Ext Time (p_c), s 0.0 4.2 0.0 0.8 0.0 2.0 0.0 0.8 Intersection Summary
HCM 7th Control Delay, s/veh 27.3
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 47 20 86 131 34 101 86 1521 96 80 1434 41 Future Volume (veh/h) 47 20 86 131 34 101 86 1521 96 80 1434 41 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 48 21 89 135 35 104 89 1568 99 82 1478 42 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 89 46 193 306 345 289 131 1891 585 126 1875 567 Arrive On Green 0.05 0.14 0.14 0.09 0.18 0.18 0.07 0.36 0.36 0.07 0.36 0.36 Sat Flow, veh/h 1810 317 1342 3510 1900 1589 1810 5187 1604 1810 5187 1570 Grp Volume(v), veh/h 48 0 110 135 35 104 89 1568 99 82 1478 42 Grp Sat Flow(s),veh/h/ln 1810 0 1658 1755 1900 1589 1810 1729 1604 1810 1729 1570 Q Serve(g_s), s 1.2 0.0 2.9 1.7 0.7 2.7 2.3 13.1 2.0 2.1 12.2 0.8 Cycle Q Clear(g_c), s 1.2 0.0 2.9 1.7 0.7 2.7 2.3 13.1 2.0 2.1 12.2 0.8 Prop In Lane 1.00 0.81 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 89 0 238 306 345 289 131 1891 585 126 1875 567 V/C Ratio(X) 0.54 0.00 0.46 0.44 0.10 0.36 0.68 0.83 0.17 0.65 0.79 0.07 Avail Cap(c_a), veh/h 189 0 903 368 1034 865 189 1955 604 189 1955 592 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.2 0.0 18.8 20.7 16.3 17.1 21.6 13.8 10.3 21.7 13.6 10.0 Incr Delay (d2), s/veh 5.0 0.0 1.4 1.0 0.1 0.8 6.0 3.1 0.1 5.6 2.2 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 1.0 0.6 0.3 0.9 1.0 3.8 0.5 0.9 3.4 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.1 0.0 20.1 21.7 16.4 17.9 27.6 16.9 10.4 27.3 15.8 10.1 LnGrp LOS C C C B B C B B C B B
Approach Vol, veh/h 158 274 1756 1602
Approach Delay, s/veh 22.3 19.6 17.1 16.2
Approach LOS C B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.3 21.4 8.2 10.9 7.5 21.3 6.4 12.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 18.0 5.0 26.0 5.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 4.1 15.1 3.7 4.9 4.3 14.2 3.2 4.7 Green Ext Time (p_c), s 0.0 2.2 0.0 0.5 0.0 2.8 0.0 0.4 Intersection Summary
HCM 7th Control Delay, s/veh 17.1
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 256 0 160 0 0 0 301 1532 0 0 1417 252 Future Volume (veh/h) 256 0 160 0 0 0 301 1532 0 0 1417 252 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 261 0 163 0 0 0 307 1563 0 0 1446 257 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 895 0 270 0 319 0 372 3434 0 0 1926 598
Arrive On Green 0.17 0.00 0.17 0.00 0.00 0.00 0.21 0.66 0.00 0.00 0.37 0.37 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 261 0 163 0 0 0 307 1563 0 0 1446 257 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 3.1 0.0 4.4 0.0 0.0 0.0 7.6 6.9 0.0 0.0 11.4 5.6 Cycle Q Clear(g_c), s 3.1 0.0 4.4 0.0 0.0 0.0 7.6 6.9 0.0 0.0 11.4 5.6 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 895 0 270 0 319 0 372 3434 0 0 1926 598 V/C Ratio(X) 0.29 0.00 0.60 0.00 0.00 0.00 0.82 0.46 0.00 0.00 0.75 0.43 Avail Cap(c_a), veh/h 1949 0 753 0 889 0 462 3861 0 0 2096 651 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 17.6 0.0 18.1 0.0 0.0 0.0 17.9 3.8 0.0 0.0 12.9 11.1 Incr Delay (d2), s/veh 0.2 0.0 2.2 0.0 0.0 0.0 9.6 0.1 0.0 0.0 1.4 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.0 1.4 0.0 0.0 0.0 3.3 0.3 0.0 0.0 3.1 1.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.8 0.0 20.3 0.0 0.0 0.0 27.5 3.9 0.0 0.0 14.3 11.5 LnGrp LOS B C C A B B
Approach Vol, veh/h 424 0 1870 1703
Approach Delay, s/veh 18.7 0.0 7.8 13.9
Approach LOS B A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 35.1 11.9 13.7 21.5 11.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 35.0 22.0 12.0 19.0 22.0
Max Q Clear Time (g_c+I1), s 8.9 6.4 9.6 13.4 0.0
Green Ext Time (p_c), s 11.6 1.5 0.2 4.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 11.6
HCM 7th LOS B
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Project Dwy G/Jet Way 01/01/2026
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 69 0 337 89 0 75 386 1847 107 14 1827 70 Future Volume (veh/h) 69 0 337 89 0 75 386 1847 107 14 1827 70 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 1870 1900 1900 1900 1900 1870 Adj Flow Rate, veh/h 0 0 433 96 0 81 406 1986 115 15 1965 74 Peak Hour Factor 0.95 0.95 0.95 0.93 0.95 0.93 0.95 0.93 0.93 0.93 0.93 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 2 0 0 0 0 2
Cap, veh/h 0 241 409 220 0 204 452 3603 1095 32 2380 727 Arrive On Green 0.00 0.00 0.13 0.13 0.00 0.13 0.25 0.69 0.69 0.02 0.46 0.46 Sat Flow, veh/h 0 1870 3170 970 0 1585 1781 5187 1577 1810 5187 1585 Grp Volume(v), veh/h 0 0 433 96 0 81 406 1986 115 15 1965 74 Grp Sat Flow(s),veh/h/ln 0 1870 1585 970 0 1585 1781 1729 1577 1810 1729 1585 Q Serve(g_s), s 0.0 0.0 9.8 7.2 0.0 3.5 16.7 14.3 1.8 0.6 25.0 2.0 Cycle Q Clear(g_c), s 0.0 0.0 9.8 7.2 0.0 3.5 16.7 14.3 1.8 0.6 25.0 2.0 Prop In Lane 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 241 409 220 0 204 452 3603 1095 32 2380 727 V/C Ratio(X) 0.00 0.00 1.06 0.44 0.00 0.40 0.90 0.55 0.10 0.46 0.83 0.10 Avail Cap(c_a), veh/h 0 445 754 326 0 377 541 3770 1146 120 2536 775 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 0.0 0.0 33.0 31.9 0.0 30.3 27.3 5.7 3.8 36.8 17.8 11.6 Incr Delay (d2), s/veh 0.0 0.0 43.0 1.4 0.0 1.2 15.9 0.2 0.0 10.0 2.3 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 6.0 1.7 0.0 1.4 8.1 2.6 0.3 0.3 8.3 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 75.9 33.2 0.0 31.5 43.2 5.9 3.8 46.8 20.1 11.7 LnGrp LOS F C C D A A D C B
Approach Vol, veh/h 433 177 2507 2054
Approach Delay, s/veh 75.9 32.4 11.8 20.0
Approach LOS E C B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 5.4 56.6 13.8 23.2 38.7 13.8
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 55.0 18.0 23.0 37.0 18.0 Max Q Clear Time (g_c+I1), s 2.6 16.3 0.0 18.7 27.0 9.2 Green Ext Time (p_c), s 0.0 20.2 0.0 0.5 7.7 0.5
Intersection Summary
HCM 7th Control Delay, s/veh 21.1
HCM 7th LOS C
Notes
User approved volume balancing among the lanes for turning movement. 4 7 h 1 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 283 166 0 1956 1863 680
Future Volume (veh/h) 283 166 0 1956 1863 680
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 304 153 0 1996 1901 0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 592 263 0 3366 3366
Arrive On Green 0.16 0.16 0.00 0.65 0.65 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 304 153 0 1996 1901 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 3.3 3.7 0.0 9.4 8.7 0.0
Cycle Q Clear(g_c), s 3.3 3.7 0.0 9.4 8.7 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 592 263 0 3366 3366
V/C Ratio(X) 0.51 0.58 0.00 0.59 0.56
Avail Cap(c_a), veh/h 1104 491 0 4745 4745
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 16.3 16.5 0.0 4.3 4.1 0.0
Incr Delay (d2), s/veh 0.7 2.0 0.0 0.2 0.1 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.2 1.3 0.0 0.2 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.0 18.5 0.0 4.4 4.3 0.0
LnGrp LOS B B A A
Approach Vol, veh/h 457 1996 1901
Approach Delay, s/veh 17.5 4.4 4.3
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 31.7 11.0 31.7
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 39.0 13.0 39.0
Max Q Clear Time (g_c+I1), s 11.4 5.7 10.7
Green Ext Time (p_c), s 16.3 1.0 15.5
Intersection Summary
HCM 7th Control Delay, s/veh 5.7
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 905 0 261 0 1697 397 224 1787 0 Future Volume (veh/h) 0 0 0 905 0 261 0 1697 397 224 1787 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 943 0 272 0 1768 414 233 1861 0 Peak Hour Factor 0.95 0.95 0.95 0.96 0.95 0.96 0.95 0.96 0.96 0.96 0.96 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 3 0 1087 0 967 0 2146 1141 332 2967 0
Arrive On Green 0.00 0.00 0.00 0.30 0.00 0.30 0.00 0.41 0.41 0.09 0.57 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 943 0 272 0 1768 414 233 1861 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 15.5 0.0 4.0 0.0 19.0 6.3 4.0 15.0 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 15.5 0.0 4.0 0.0 19.0 6.3 4.0 15.0 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 3 0 1087 0 967 0 2146 1141 332 2967 0 V/C Ratio(X) 0.00 0.00 0.00 0.87 0.00 0.28 0.00 0.82 0.36 0.70 0.63 0.00 Avail Cap(c_a), veh/h 0 149 0 1212 0 1540 0 2233 1168 336 3060 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 20.8 0.0 16.8 0.0 16.4 3.5 27.5 9.0 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 6.4 0.0 0.2 0.0 2.6 0.2 6.3 0.4 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 6.5 0.0 1.3 0.0 6.0 0.8 1.8 3.4 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 27.1 0.0 16.9 0.0 18.9 3.7 33.9 9.4 0.0 LnGrp LOS C B B A C A
Approach Vol, veh/h 0 1215 2182 2094
Approach Delay, s/veh 0.0 24.9 16.0 12.1
Approach LOS C B B
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 9.9 29.9 22.8 0.0 39.9 22.8
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 6.0 27.0 21.0 5.0 37.0 30.0 Max Q Clear Time (g_c+I1), s 6.0 21.0 17.5 0.0 17.0 6.0 Green Ext Time (p_c), s 0.0 4.9 1.4 0.0 12.3 1.0
Intersection Summary
HCM 7th Control Delay, s/veh 16.5
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/27/2025 Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 319 531 155 306 672 394 159 1185 215 333 1767 326 Future Volume (veh/h) 319 531 155 306 672 394 159 1185 215 333 1767 326 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 339 565 165 326 715 419 169 1261 229 354 1880 347 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 346 1482 454 401 1565 479 240 1431 260 415 1940 602 Arrive On Green 0.10 0.29 0.29 0.11 0.30 0.30 0.07 0.32 0.32 0.12 0.37 0.37 Sat Flow, veh/h 3510 5187 1590 3510 5187 1588 3510 4412 801 3510 5187 1610 Grp Volume(v), veh/h 339 565 165 326 715 419 169 988 502 354 1880 347 Grp Sat Flow(s),veh/h/ln 1755 1729 1590 1755 1729 1588 1755 1729 1756 1755 1729 1610 Q Serve(g_s), s 9.8 8.9 8.4 9.2 11.3 25.4 4.8 27.5 27.5 10.0 36.1 17.5 Cycle Q Clear(g_c), s 9.8 8.9 8.4 9.2 11.3 25.4 4.8 27.5 27.5 10.0 36.1 17.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.46 1.00 1.00
Lane Grp Cap(c), veh/h 346 1482 454 401 1565 479 240 1121 569 415 1940 602 V/C Ratio(X) 0.98 0.38 0.36 0.81 0.46 0.87 0.70 0.88 0.88 0.85 0.97 0.58 Avail Cap(c_a), veh/h 346 1482 454 518 1736 532 242 1123 570 415 1940 602 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 45.7 29.1 28.9 43.9 28.7 33.6 46.3 32.5 32.5 43.9 31.2 25.4 Incr Delay (d2), s/veh 43.1 0.2 0.5 7.4 0.2 14.0 8.9 8.4 14.9 15.7 13.8 1.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.2 3.5 3.1 4.3 4.5 11.1 2.3 11.7 12.9 5.0 15.9 6.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 88.8 29.2 29.4 51.4 28.9 47.6 55.2 40.8 47.4 59.7 45.0 26.7 LnGrp LOS F C C D C D E D D E D C
Approach Vol, veh/h 1069 1460 1659 2581
Approach Delay, s/veh 48.2 39.3 44.3 44.6
Approach LOS D D D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 16.0 36.9 15.6 33.0 10.9 42.0 14.0 34.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 12.0 33.0 15.0 29.0 7.0 38.0 10.0 34.0 Max Q Clear Time (g_c+I1), s 12.0 29.5 11.2 10.9 6.8 38.1 11.8 27.4 Green Ext Time (p_c), s 0.0 2.5 0.4 3.8 0.0 0.0 0.0 3.2 Intersection Summary
HCM 7th Control Delay, s/veh 43.9
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 143 0 158 0 0 0 210 1146 0 0 1030 145 Future Volume (veh/h) 143 0 158 0 0 0 210 1146 0 0 1030 145 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 151 0 166 0 0 0 221 1206 0 0 1084 153 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 532 0 0 0 5 0 434 3249 0 0 2031 622
Arrive On Green 0.15 0.00 0.00 0.00 0.00 0.00 0.12 0.63 0.00 0.00 0.39 0.39 Sat Flow, veh/h 3510 151 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 151 13.8 0 0 0 221 1206 0 0 1084 153 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 1.4 0.0 0.0 0.0 2.1 4.1 0.0 0.0 5.8 2.3 Cycle Q Clear(g_c), s 1.4 0.0 0.0 0.0 2.1 4.1 0.0 0.0 5.8 2.3 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 532 0 5 0 434 3249 0 0 2031 622
V/C Ratio(X) 0.28 0.00 0.00 0.00 0.51 0.37 0.00 0.00 0.53 0.25 Avail Cap(c_a), veh/h 2730 0 1530 0 488 4466 0 0 3170 971 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 13.5 0.0 0.0 0.0 14.8 3.3 0.0 0.0 8.4 7.4 Incr Delay (d2), s/veh 0.3 0.0 0.0 0.0 0.9 0.1 0.0 0.0 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 0.0 0.0 0.6 0.0 0.0 0.0 1.1 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.8 0.0 0.0 0.0 15.7 3.3 0.0 0.0 8.6 7.6 LnGrp LOS B B A A A
Approach Vol, veh/h 0 1427 1237
Approach Delay, s/veh 0.0 5.3 8.5
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 26.5 8.5 18.1 9.5 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 6.1 4.1 7.8 3.4 0.0
Green Ext Time (p_c), s 8.4 0.1 6.2 0.4 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.1
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 151 520 183 244 827 294 202 930 219 217 824 109 Future Volume (veh/h) 151 520 183 244 827 294 202 930 219 217 824 109 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 154 531 187 249 844 300 206 949 223 221 841 111 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 236 1482 450 284 1552 472 298 1476 452 468 1727 528 Arrive On Green 0.07 0.29 0.29 0.08 0.30 0.30 0.08 0.28 0.28 0.13 0.33 0.33 Sat Flow, veh/h 3510 5187 1576 3510 5187 1578 3510 5187 1586 3510 5187 1587 Grp Volume(v), veh/h 154 531 187 249 844 300 206 949 223 221 841 111 Grp Sat Flow(s),veh/h/ln 1755 1729 1576 1755 1729 1578 1755 1729 1586 1755 1729 1587 Q Serve(g_s), s 3.2 6.0 7.1 5.2 10.1 12.2 4.2 11.9 8.7 4.3 9.6 3.7 Cycle Q Clear(g_c), s 3.2 6.0 7.1 5.2 10.1 12.2 4.2 11.9 8.7 4.3 9.6 3.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 236 1482 450 284 1552 472 298 1476 452 468 1727 528 V/C Ratio(X) 0.65 0.36 0.42 0.88 0.54 0.64 0.69 0.64 0.49 0.47 0.49 0.21 Avail Cap(c_a), veh/h 284 2376 722 284 2376 723 426 2376 727 473 2446 748 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.8 21.1 21.5 33.7 21.8 22.5 33.0 23.2 22.1 29.7 19.7 17.8 Incr Delay (d2), s/veh 3.9 0.1 0.6 25.2 0.3 1.4 2.9 0.5 0.8 0.7 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 2.2 2.4 3.1 3.7 4.2 1.8 4.3 3.0 1.7 3.4 1.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 37.7 21.2 22.1 58.9 22.1 23.9 35.9 23.7 22.9 30.5 19.9 17.9 LnGrp LOS D C C E C C D C C C B B
Approach Vol, veh/h 872 1393 1378 1173
Approach Delay, s/veh 24.3 29.1 25.4 21.7
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.9 25.1 10.0 25.2 10.3 28.7 9.0 26.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 34.0 6.0 34.0 9.0 35.0 6.0 34.0 Max Q Clear Time (g_c+I1), s 6.3 13.9 7.2 9.1 6.2 11.6 5.2 14.2 Green Ext Time (p_c), s 0.2 6.7 0.0 4.0 0.2 5.8 0.0 6.4 Intersection Summary
HCM 7th Control Delay, s/veh 25.4
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/27/2025
Year 2027 Cumulative + Project Phase I Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 38 77 204 88 123 49 178 1306 89 30 1147 62 Future Volume (veh/h) 38 77 204 88 123 49 178 1306 89 30 1147 62 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 40 80 212 92 128 51 185 1360 93 31 1195 65 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 72 332 282 118 381 318 229 2296 697 60 1812 550 Arrive On Green 0.04 0.17 0.17 0.07 0.20 0.20 0.13 0.44 0.44 0.03 0.35 0.35 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 40 80 212 92 128 51 185 1360 93 31 1195 65 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 1.4 2.3 7.9 3.2 3.7 1.7 6.3 12.6 2.2 1.1 12.4 1.8 Cycle Q Clear(g_c), s 1.4 2.3 7.9 3.2 3.7 1.7 6.3 12.6 2.2 1.1 12.4 1.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 72 332 282 118 381 318 229 2296 697 60 1812 550 V/C Ratio(X) 0.55 0.24 0.75 0.78 0.34 0.16 0.81 0.59 0.13 0.52 0.66 0.12 Avail Cap(c_a), veh/h 171 1168 990 143 1138 951 257 3026 919 171 2781 844 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.9 22.5 24.9 29.2 21.7 20.9 27.0 13.4 10.5 30.2 17.4 14.0 Incr Delay (d2), s/veh 6.5 0.4 4.1 19.6 0.5 0.2 15.8 0.2 0.1 6.7 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 1.0 3.2 2.0 1.6 0.6 3.4 3.8 0.7 0.5 4.0 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.4 22.9 28.9 48.8 22.2 21.2 42.7 13.6 10.6 36.9 17.9 14.1 LnGrp LOS D C C D C C D B B D B B
Approach Vol, veh/h 332 271 1638 1291
Approach Delay, s/veh 28.4 31.1 16.7 18.1
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.1 32.1 8.2 17.1 12.0 26.2 6.5 18.7 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 37.0 5.0 39.0 9.0 34.0 6.0 38.0 Max Q Clear Time (g_c+I1), s 3.1 14.6 5.2 9.9 8.3 14.4 3.4 5.7 Green Ext Time (p_c), s 0.0 9.7 0.0 1.2 0.0 7.8 0.0 0.9 Intersection Summary
HCM 7th Control Delay, s/veh 19.4
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
HCM 7th TWSC SWC Rosedale & Coffee
27: El Toro Viejo Rd & Project Dwy A 01/04/2026
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 5.3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 10 149 72 10 150 115
Future Vol, veh/h 10 149 72 10 150 115
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 0 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 10 152 73 10 153 117
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 443 42 0 0 84 0
Stage 1 79 - - - - -
Stage 2 365 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 543 1020 - - 1511 -
Stage 1 935 - - - - -
Stage 2 673 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 488 1020 - - 1511 -
Mov Cap-2 Maneuver 488 - - - - -
Stage 1 935 - - - - -
Stage 2 605 - - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 9.54 0 4.33
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 954 1511 -
HCM Lane V/C Ratio - - 0.17 0.101 -
HCM Ctrl Dly (s/v) - - 9.5 7.7 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - 0.6 0.3 -
* *1 h *
HCM 7th TWSC SWC Rosedale & Coffee
28: Project Dwy B & Rosedale Highway 01/04/2026
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1440 41 0 1618 0 40
Future Vol, veh/h 1440 41 0 1618 0 40
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 90 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1469 42 0 1651 0 41
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 735
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 311
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 311
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 18.33
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 311 - - -
HCM Lane V/C Ratio 0.131 - - -
HCM Ctrl Dly (s/v) 18.3 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.4 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
29: Project Dwy C & Rosedale Highway 01/04/2026
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1447 40 0 1623 0 40
Future Vol, veh/h 1447 40 0 1623 0 40
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1477 41 0 1656 0 41
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 738
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 309
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 309
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 18.41
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 309 - - -
HCM Lane V/C Ratio 0.132 - - -
HCM Ctrl Dly (s/v) 18.4 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.5 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
30: Project Dwy E & Rosedale Highway 01/04/2026
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1372 30 0 1615 0 56
Future Vol, veh/h 1372 30 0 1615 0 56
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1414 31 0 1665 0 58
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 707
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 324
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 324
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 18.51
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 324 - - -
HCM Lane V/C Ratio 0.178 - - -
HCM Ctrl Dly (s/v) 18.5 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.6 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
31: Coffee Road & Project Dwy F 01/04/2026
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 25 0 2081 1845 51
Future Vol, veh/h 0 25 0 2081 1845 51
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - 50
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 26 0 2145 1902 53
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 951 - 0 - 0
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 224 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 224 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 23.19 0 0
HCM LOS C
Minor Lane/Major Mvmt NBT EBLn1 SBT SBR
Capacity (veh/h) - 224 - -
HCM Lane V/C Ratio - 0.115 - -
HCM Ctrl Dly (s/v) - 23.2 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.4 - -
I* 7
HCM 7th TWSC SWC Rosedale & Coffee
32: Coffee Road & Project Dwy H 01/04/2026
Year 2027 Cumulative + Phase I Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 25 0 2340 1866 0
Future Vol, veh/h 0 25 0 2340 1866 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 26 0 2463 1964 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 982 - 0 - 0
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 213 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 213 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 24.25 0 0
HCM LOS C
Minor Lane/Major Mvmt NBT EBLn1 SBT SBR
Capacity (veh/h) - 213 - -
HCM Lane V/C Ratio - 0.123 - -
HCM Ctrl Dly (s/v) - 24.2 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.4 - -
f ** **t
Appendix E. Year 2028 Cumulative
Peak Hour Analysis Worksheets
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 33 1142 29 2 811 38 5 4 0 33 12 30 Future Volume (veh/h) 33 1142 29 2 811 38 5 4 0 33 12 30 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 35 1202 31 2 854 40 5 4 0 35 13 32 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.96 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 76 2093 54 6 1844 86 326 210 0 264 112 143
Arrive On Green 0.04 0.40 0.40 0.00 0.36 0.36 0.22 0.22 0.00 0.22 0.22 0.22 Sat Flow, veh/h 1810 5199 134 1810 5071 237 686 958 0 467 512 652 Grp Volume(v), veh/h 35 799 434 2 582 312 9 0 0 80 0 0
Grp Sat Flow(s),veh/h/ln 1810 1729 1875 1810 1729 1850 1643 0 0 1631 0 0 Q Serve(g_s), s 0.6 5.7 5.7 0.0 4.1 4.1 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.6 5.7 5.7 0.0 4.1 4.1 0.1 0.0 0.0 1.2 0.0 0.0 Prop In Lane 1.00 0.07 1.00 0.13 0.56 0.00 0.44 0.40
Lane Grp Cap(c), veh/h 76 1392 755 6 1257 673 535 0 0 519 0 0 V/C Ratio(X) 0.46 0.57 0.57 0.35 0.46 0.46 0.02 0.00 0.00 0.15 0.00 0.00 Avail Cap(c_a), veh/h 283 1948 1057 283 1948 1042 1422 0 0 1401 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 15.0 7.4 7.4 15.9 7.8 7.8 9.8 0.0 0.0 10.2 0.0 0.0 Incr Delay (d2), s/veh 4.4 0.4 0.7 33.6 0.3 0.5 0.0 0.0 0.0 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.8 1.0 0.1 0.7 0.8 0.0 0.0 0.0 0.3 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 19.3 7.8 8.1 49.5 8.0 8.3 9.8 0.0 0.0 10.3 0.0 0.0 LnGrp LOS B A A D A A A B
Approach Vol, veh/h 1268 896 9 80
Approach Delay, s/veh 8.2 8.2 9.8 10.3
Approach LOS A A A B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.1 16.9 11.0 5.3 15.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.1 2.0 7.7 3.2 2.6 6.1
Green Ext Time (p_c), s 0.0 0.0 5.1 0.3 0.0 4.0
Intersection Summary
HCM 7th Control Delay, s/veh 8.3
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 177 694 389 140 610 152 290 1259 259 188 1094 128 Future Volume (veh/h) 177 694 389 140 610 152 290 1259 259 188 1094 128 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 203 798 447 161 701 175 333 1447 298 216 1257 147 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 329 1615 495 229 1466 577 393 1718 638 278 1549 631 Arrive On Green 0.10 0.33 0.33 0.07 0.30 0.30 0.12 0.35 0.35 0.08 0.32 0.32 Sat Flow, veh/h 3291 4863 1491 3291 4863 1490 3291 4863 1508 3291 4863 1508 Grp Volume(v), veh/h 203 798 447 161 701 175 333 1447 298 216 1257 147 Grp Sat Flow(s),veh/h/ln 1646 1621 1491 1646 1621 1490 1646 1621 1508 1646 1621 1508 Q Serve(g_s), s 5.9 13.1 28.5 4.8 11.7 8.1 9.9 27.3 14.2 6.4 23.7 6.3 Cycle Q Clear(g_c), s 5.9 13.1 28.5 4.8 11.7 8.1 9.9 27.3 14.2 6.4 23.7 6.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 329 1615 495 229 1466 577 393 1718 638 278 1549 631 V/C Ratio(X) 0.62 0.49 0.90 0.70 0.48 0.30 0.85 0.84 0.47 0.78 0.81 0.23 Avail Cap(c_a), veh/h 330 1708 524 231 1562 606 396 1855 680 297 1708 681 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 43.0 26.6 31.7 45.4 28.4 21.3 43.0 29.7 20.7 44.7 31.2 18.7 Incr Delay (d2), s/veh 3.4 0.2 18.4 9.2 0.2 0.3 15.6 3.5 0.5 11.5 2.8 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.4 4.7 11.9 2.2 4.3 2.7 4.6 10.1 4.6 2.9 8.8 2.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 46.4 26.8 50.1 54.5 28.6 21.6 58.5 33.1 21.2 56.2 34.0 18.8 LnGrp LOS D C D D C C E C C E C B
Approach Vol, veh/h 1448 1037 2078 1620
Approach Delay, s/veh 36.8 31.5 35.5 35.6
Approach LOS D C D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 12.4 39.2 10.9 37.1 15.9 35.7 14.0 34.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 9.0 38.0 7.0 35.0 12.0 35.0 10.0 32.0 Max Q Clear Time (g_c+I1), s 8.4 29.3 6.8 30.5 11.9 25.7 7.9 13.7 Green Ext Time (p_c), s 0.0 5.9 0.0 2.6 0.0 5.3 0.1 4.7 Intersection Summary
HCM 7th Control Delay, s/veh 35.1
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Rosedale Highway & NW Promenade 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 67 1265 808 61 86 50
Future Volume (veh/h) 67 1265 808 61 86 50
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 74 1390 888 67 95 55
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 268 2965 1887 585 580 266
Arrive On Green 0.08 0.57 0.36 0.36 0.17 0.17
Sat Flow, veh/h 3510 5358 5358 1608 3510 1610
Grp Volume(v), veh/h 74 1390 888 67 95 55
Grp Sat Flow(s),veh/h/ln 1755 1729 1729 1608 1755 1610
Q Serve(g_s), s 0.6 4.8 4.0 0.8 0.7 0.9
Cycle Q Clear(g_c), s 0.6 4.8 4.0 0.8 0.7 0.9
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 268 2965 1887 585 580 266
V/C Ratio(X) 0.28 0.47 0.47 0.11 0.16 0.21
Avail Cap(c_a), veh/h 577 5115 3580 1110 3693 1694
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 13.3 3.8 7.4 6.4 10.9 11.0
Incr Delay (d2), s/veh 0.6 0.1 0.2 0.1 0.1 0.4
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 0.6 0.0 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.8 3.9 7.6 6.5 11.0 11.4
LnGrp LOS B A A A B B
Approach Vol, veh/h 1464 955 150
Approach Delay, s/veh 4.4 7.5 11.1
Approach LOS A A B
Timer - Assigned Phs 4 6 7 8
Phs Duration (G+Y+Rc), s 21.4 9.0 6.3 15.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 30.0 32.0 5.0 21.0
Max Q Clear Time (g_c+I1), s 6.8 2.9 2.6 6.0
Green Ext Time (p_c), s 9.8 0.5 0.0 5.0
Intersection Summary
HCM 7th Control Delay, s/veh 6.0
HCM 7th LOS A
" +++ 1 7 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 120 1067 12 14 710 89 10 24 50 223 26 112 Future Volume (veh/h) 120 1067 12 14 710 89 10 24 50 223 26 112 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 135 1199 13 16 798 100 11 27 56 251 29 126 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 308 1970 612 36 1619 503 50 534 237 402 896 393 Arrive On Green 0.09 0.38 0.38 0.02 0.31 0.31 0.01 0.15 0.15 0.11 0.25 0.25 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1600 3510 3610 1582 Grp Volume(v), veh/h 135 1199 13 16 798 100 11 27 56 251 29 126 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1600 1755 1805 1582 Q Serve(g_s), s 1.7 8.8 0.2 0.4 5.9 2.2 0.1 0.3 1.5 3.2 0.3 3.1 Cycle Q Clear(g_c), s 1.7 8.8 0.2 0.4 5.9 2.2 0.1 0.3 1.5 3.2 0.3 3.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 308 1970 612 36 1619 503 50 534 237 402 896 393 V/C Ratio(X) 0.44 0.61 0.02 0.44 0.49 0.20 0.22 0.05 0.24 0.62 0.03 0.32 Avail Cap(c_a), veh/h 519 3066 952 191 2847 884 371 2287 1014 815 2744 1203 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 20.5 11.8 9.2 22.9 13.2 11.9 23.1 17.3 17.8 20.0 13.5 14.5 Incr Delay (d2), s/veh 1.0 0.3 0.0 8.2 0.2 0.2 2.2 0.0 0.5 1.6 0.0 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 2.3 0.1 0.2 1.7 0.6 0.1 0.1 0.5 1.2 0.1 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.5 12.2 9.2 31.1 13.5 12.1 25.3 17.4 18.3 21.6 13.5 15.0 LnGrp LOS C B A C B B C B B C B B
Approach Vol, veh/h 1347 914 94 406
Approach Delay, s/veh 13.1 13.6 18.9 19.0
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.4 11.0 4.9 22.0 4.7 15.7 8.2 18.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 30.0 5.0 28.0 5.0 36.0 7.0 26.0 Max Q Clear Time (g_c+I1), s 5.2 3.5 2.4 10.8 2.1 5.1 3.7 7.9 Green Ext Time (p_c), s 0.4 0.3 0.0 7.2 0.0 0.5 0.1 5.0 Intersection Summary
HCM 7th Control Delay, s/veh 14.3
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 126 483 162 311 745 109 244 670 203 91 949 253 Future Volume (veh/h) 126 483 162 311 745 109 244 670 203 91 949 253 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 138 531 178 342 819 120 268 736 223 100 1043 278 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 212 986 305 390 1248 386 303 2037 632 191 1302 573 Arrive On Green 0.06 0.20 0.20 0.12 0.25 0.25 0.09 0.42 0.42 0.06 0.38 0.38 Sat Flow, veh/h 3319 4904 1518 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 138 531 178 342 819 120 268 736 223 100 1043 278 Grp Sat Flow(s),veh/h/ln 1659 1635 1518 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 3.1 7.4 8.1 7.8 11.5 4.9 6.1 7.9 7.7 2.2 20.9 10.8 Cycle Q Clear(g_c), s 3.1 7.4 8.1 7.8 11.5 4.9 6.1 7.9 7.7 2.2 20.9 10.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 212 986 305 390 1248 386 303 2037 632 191 1302 573 V/C Ratio(X) 0.65 0.54 0.58 0.88 0.66 0.31 0.88 0.36 0.35 0.52 0.80 0.49 Avail Cap(c_a), veh/h 303 2047 634 390 2175 674 303 2303 714 303 1603 705 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.0 27.4 27.7 33.3 25.6 23.1 34.4 15.4 15.3 35.1 21.1 18.0 Incr Delay (d2), s/veh 3.3 0.5 1.8 19.7 0.6 0.5 25.1 0.1 0.3 2.2 2.5 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 2.7 2.8 3.9 4.0 1.6 3.3 2.5 2.3 0.9 7.5 3.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 38.4 27.9 29.5 53.0 26.2 23.6 59.5 15.5 15.7 37.3 23.6 18.6 LnGrp LOS D C C D C C E B B D C B
Approach Vol, veh/h 847 1281 1227 1421
Approach Delay, s/veh 29.9 33.1 25.2 23.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.4 35.8 13.0 19.4 11.0 33.2 8.9 23.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 36.0 9.0 32.0 7.0 36.0 7.0 34.0 Max Q Clear Time (g_c+I1), s 4.2 9.9 9.8 10.1 8.1 22.9 5.1 13.5 Green Ext Time (p_c), s 0.1 3.5 0.0 3.8 0.0 6.2 0.1 5.4 Intersection Summary
HCM 7th Control Delay, s/veh 27.7
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 80 689 20 20 519 91 52 28 34 338 77 99 Future Volume (veh/h) 80 689 20 20 519 91 52 28 34 338 77 99 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 85 733 21 21 552 97 55 30 36 360 82 105 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 125 1394 430 46 813 359 96 291 245 429 640 541 Arrive On Green 0.07 0.27 0.27 0.03 0.23 0.23 0.05 0.15 0.15 0.24 0.34 0.34 Sat Flow, veh/h 1810 5187 1598 1810 3610 1596 1810 1900 1601 1810 1900 1606 Grp Volume(v), veh/h 85 733 21 21 552 97 55 30 36 360 82 105 Grp Sat Flow(s),veh/h/ln 1810 1729 1598 1810 1805 1596 1810 1900 1601 1810 1900 1606 Q Serve(g_s), s 2.3 6.1 0.5 0.6 7.1 2.5 1.5 0.7 1.0 9.6 1.5 2.3 Cycle Q Clear(g_c), s 2.3 6.1 0.5 0.6 7.1 2.5 1.5 0.7 1.0 9.6 1.5 2.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 125 1394 430 46 813 359 96 291 245 429 640 541 V/C Ratio(X) 0.68 0.53 0.05 0.46 0.68 0.27 0.57 0.10 0.15 0.84 0.13 0.19 Avail Cap(c_a), veh/h 179 1843 568 179 1283 567 214 938 790 572 1313 1110 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 23.0 15.8 13.7 24.3 17.9 16.2 23.4 18.5 18.6 18.4 11.6 11.9 Incr Delay (d2), s/veh 6.4 0.3 0.0 7.0 1.0 0.4 5.2 0.2 0.3 8.3 0.1 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 1.9 0.1 0.3 2.4 0.8 0.7 0.3 0.3 4.4 0.5 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.5 16.1 13.8 31.4 19.0 16.6 28.7 18.6 18.9 26.7 11.7 12.1 LnGrp LOS C B B C B B C B B C B B
Approach Vol, veh/h 839 670 121 547
Approach Delay, s/veh 17.4 19.0 23.3 21.6
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 16.0 11.8 5.3 17.6 6.7 21.1 7.5 15.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 16.0 25.0 5.0 18.0 6.0 35.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 11.6 3.0 2.6 8.1 3.5 4.3 4.3 9.1 Green Ext Time (p_c), s 0.5 0.2 0.0 3.2 0.0 0.8 0.0 1.9 Intersection Summary
HCM 7th Control Delay, s/veh 19.3
HCM 7th LOS B
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 24 635 247 105 449 18 129 26 173 37 56 14 Future Volume (veh/h) 24 635 247 105 449 18 129 26 173 37 56 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 28 730 284 121 516 21 148 30 199 43 64 16 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 59 1037 448 157 1232 545 189 426 360 84 315 262 Arrive On Green 0.03 0.29 0.29 0.09 0.34 0.34 0.10 0.22 0.22 0.05 0.17 0.17 Sat Flow, veh/h 1810 3610 1557 1810 3610 1596 1810 1900 1606 1810 1900 1583 Grp Volume(v), veh/h 28 730 284 121 516 21 148 30 199 43 64 16 Grp Sat Flow(s),veh/h/ln 1810 1805 1557 1810 1805 1596 1810 1900 1606 1810 1900 1583 Q Serve(g_s), s 0.7 8.1 7.2 2.9 4.9 0.4 3.6 0.6 4.9 1.0 1.3 0.4 Cycle Q Clear(g_c), s 0.7 8.1 7.2 2.9 4.9 0.4 3.6 0.6 4.9 1.0 1.3 0.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 59 1037 448 157 1232 545 189 426 360 84 315 262 V/C Ratio(X) 0.47 0.70 0.63 0.77 0.42 0.04 0.78 0.07 0.55 0.51 0.20 0.06 Avail Cap(c_a), veh/h 201 1525 658 201 1525 674 201 1056 892 201 1056 880 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.4 14.3 14.0 20.1 11.4 9.9 19.6 13.8 15.5 21.0 16.2 15.8 Incr Delay (d2), s/veh 5.7 0.9 1.5 12.9 0.2 0.0 17.0 0.1 1.3 4.8 0.3 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.5 2.0 1.6 1.4 0.1 2.2 0.2 1.5 0.5 0.5 0.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.1 15.2 15.5 33.1 11.6 9.9 36.6 13.8 16.8 25.8 16.5 15.9 LnGrp LOS C B B C B A D B B C B B
Approach Vol, veh/h 1042 658 377 123
Approach Delay, s/veh 15.6 15.5 24.3 19.7
Approach LOS B B C B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.1 14.1 7.9 16.9 8.7 11.5 5.5 19.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 25.0 5.0 19.0 5.0 25.0 5.0 19.0 Max Q Clear Time (g_c+I1), s 3.0 6.9 4.9 10.1 5.6 3.3 2.7 6.9 Green Ext Time (p_c), s 0.0 0.7 0.0 2.3 0.0 0.3 0.0 2.3 Intersection Summary
HCM 7th Control Delay, s/veh 17.3
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 266 0 576 437 448 437 303 1121 2 2 1437 182 Future Volume (veh/h) 266 0 576 437 448 437 303 1121 2 2 1437 182 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 324 0 702 604 446 533 370 1367 2 2 1752 222 Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 555 0 493 847 445 753 368 2404 4 5 1801 559
Arrive On Green 0.16 0.00 0.16 0.24 0.24 0.24 0.11 0.46 0.46 0.00 0.36 0.36 Sat Flow, veh/h 3506 0 3114 3506 1841 3116 3401 5182 8 1753 5025 1559 Grp Volume(v), veh/h 324 0 702 604 446 533 370 884 485 2 1752 222 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1839 1753 1675 1559 Q Serve(g_s), s 10.3 0.0 19.0 18.9 29.0 18.8 13.0 23.0 23.0 0.1 41.2 12.8 Cycle Q Clear(g_c), s 10.3 0.0 19.0 18.9 29.0 18.8 13.0 23.0 23.0 0.1 41.2 12.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 555 0 493 847 445 753 368 1554 853 5 1801 559 V/C Ratio(X) 0.58 0.00 1.42 0.71 1.00 0.71 1.00 0.57 0.57 0.42 0.97 0.40 Avail Cap(c_a), veh/h 555 0 493 847 445 753 368 1554 853 73 1801 559 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 46.8 0.0 50.5 41.7 45.5 41.6 53.5 23.4 23.4 59.7 37.9 28.8 Incr Delay (d2), s/veh 1.6 0.0 202.3 2.8 43.3 3.1 48.0 0.5 0.9 50.9 15.3 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.4 0.0 21.0 8.2 18.0 7.2 7.8 8.4 9.4 0.1 18.1 4.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 48.4 0.0 252.8 44.5 88.8 44.7 101.5 23.9 24.3 110.6 53.2 29.3 LnGrp LOS D F D F D F C C F D C
Approach Vol, veh/h 1026 1583 1739 1976
Approach Delay, s/veh 188.2 57.1 40.5 50.6
Approach LOS F E D D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.3 59.7 23.0 17.0 47.0 33.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 51.0 19.0 13.0 43.0 29.0 Max Q Clear Time (g_c+I1), s 2.1 25.0 21.0 15.0 43.2 31.0 Green Ext Time (p_c), s 0.0 9.0 0.0 0.0 0.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 71.8
HCM 7th LOS E
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 771 32 32 559 72 89
Future Volume (veh/h) 771 32 32 559 72 89
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 876 36 36 635 82 101
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1442 59 77 2077 133 163
Arrive On Green 0.41 0.41 0.04 0.58 0.18 0.18
Sat Flow, veh/h 3628 145 1810 3705 755 930
Grp Volume(v), veh/h 448 464 36 635 184 0
Grp Sat Flow(s),veh/h/ln 1805 1873 1810 1805 1695 0
Q Serve(g_s), s 6.3 6.3 0.6 2.9 3.2 0.0
Cycle Q Clear(g_c), s 6.3 6.3 0.6 2.9 3.2 0.0
Prop In Lane 0.08 1.00 0.45 0.55
Lane Grp Cap(c), veh/h 737 765 77 2077 298 0
V/C Ratio(X) 0.61 0.61 0.47 0.31 0.62 0.00
Avail Cap(c_a), veh/h 1460 1515 281 3931 896 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 7.5 7.5 15.0 3.5 12.3 0.0
Incr Delay (d2), s/veh 0.8 0.8 4.3 0.1 2.1 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.1 1.1 0.3 0.0 1.1 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 8.3 8.3 19.3 3.6 14.3 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 912 671 184
Approach Delay, s/veh 8.3 4.4 14.3
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 9.6 5.4 17.1 22.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 17.0 5.0 26.0 35.0
Max Q Clear Time (g_c+I1), s 5.2 2.6 8.3 4.9
Green Ext Time (p_c), s 0.4 0.0 4.8 4.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.5
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 173 342 298 134 311 234 227 891 131 248 1174 143 Future Volume (veh/h) 173 342 298 134 311 234 227 891 131 248 1174 143 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 201 398 347 156 362 272 264 1036 152 288 1365 166 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 294 928 716 241 874 388 359 1730 529 390 1775 550 Arrive On Green 0.08 0.26 0.26 0.07 0.24 0.24 0.10 0.33 0.33 0.11 0.34 0.34 Sat Flow, veh/h 3510 3610 2785 3510 3610 1602 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 201 398 347 156 362 272 264 1036 152 288 1365 166 Grp Sat Flow(s),veh/h/ln 1755 1805 1392 1755 1805 1602 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 3.9 6.4 7.4 3.0 5.9 10.8 5.1 11.6 4.9 5.5 16.4 5.3 Cycle Q Clear(g_c), s 3.9 6.4 7.4 3.0 5.9 10.8 5.1 11.6 4.9 5.5 16.4 5.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 294 928 716 241 874 388 359 1730 529 390 1775 550 V/C Ratio(X) 0.68 0.43 0.48 0.65 0.41 0.70 0.74 0.60 0.29 0.74 0.77 0.30 Avail Cap(c_a), veh/h 353 1762 1359 252 1658 736 403 1862 570 504 2011 623 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.0 21.6 22.0 31.6 22.2 24.1 30.3 19.3 17.1 30.0 20.4 16.8 Incr Delay (d2), s/veh 4.2 0.3 0.5 5.4 0.3 2.3 6.1 0.5 0.3 4.1 1.6 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.7 2.4 2.1 1.3 2.2 3.8 2.2 4.0 1.6 2.3 5.8 1.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.2 21.9 22.5 37.0 22.5 26.4 36.4 19.8 17.4 34.1 22.1 17.1 LnGrp LOS D C C D C C D B B C C B
Approach Vol, veh/h 946 790 1452 1819
Approach Delay, s/veh 24.9 26.7 22.6 23.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.7 27.2 8.8 21.9 11.1 27.8 9.8 20.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 25.0 5.0 34.0 8.0 27.0 7.0 32.0 Max Q Clear Time (g_c+I1), s 7.5 13.6 5.0 9.4 7.1 18.4 5.9 12.8 Green Ext Time (p_c), s 0.2 5.2 0.0 3.8 0.1 5.5 0.1 2.8 Intersection Summary
HCM 7th Control Delay, s/veh 24.0
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 6 701 157 92 476 6 154 6 159 21 16 9 Future Volume (veh/h) 6 701 157 92 476 6 154 6 159 21 16 9 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 8 876 196 115 595 8 192 8 199 26 20 11 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 26 1237 534 181 1560 21 300 13 277 96 74 41
Arrive On Green 0.01 0.34 0.34 0.10 0.43 0.43 0.17 0.17 0.17 0.12 0.12 0.12 Sat Flow, veh/h 1810 3610 1559 1810 3646 49 1740 73 1607 819 630 347 Grp Volume(v), veh/h 8 876 196 115 294 309 200 0 199 57 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1559 1810 1805 1890 1813 0 1607 1796 0 0 Q Serve(g_s), s 0.3 12.6 5.6 3.7 6.7 6.7 6.1 0.0 7.0 1.7 0.0 0.0 Cycle Q Clear(g_c), s 0.3 12.6 5.6 3.7 6.7 6.7 6.1 0.0 7.0 1.7 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.03 0.96 1.00 0.46 0.19
Lane Grp Cap(c), veh/h 26 1237 534 181 772 809 313 0 277 210 0 0 V/C Ratio(X) 0.30 0.71 0.37 0.64 0.38 0.38 0.64 0.00 0.72 0.27 0.00 0.00 Avail Cap(c_a), veh/h 212 1692 731 303 937 980 577 0 511 210 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 29.1 17.0 14.8 25.9 11.7 11.7 23.0 0.0 23.3 24.0 0.0 0.0 Incr Delay (d2), s/veh 6.3 0.9 0.4 3.7 0.3 0.3 2.2 0.0 3.5 0.7 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 4.3 1.7 1.6 2.1 2.2 2.5 0.0 2.5 0.7 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.4 17.9 15.2 29.5 12.0 12.0 25.2 0.0 26.8 24.7 0.0 0.0 LnGrp LOS D B B C B B C C C
Approach Vol, veh/h 1080 718 399 57
Approach Delay, s/veh 17.5 14.8 26.0 24.7
Approach LOS B B C C
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 14.3 10.0 24.5 11.0 4.9 29.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 19.0 10.0 28.0 7.0 7.0 31.0 Max Q Clear Time (g_c+I1), s 9.0 5.7 14.6 3.7 2.3 8.7
Green Ext Time (p_c), s 1.2 0.1 5.1 0.0 0.0 3.1
Intersection Summary
HCM 7th Control Delay, s/veh 18.3
HCM 7th LOS B
h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 64 424 196 284 247 52 130 92 244 79 176 15 Future Volume (veh/h) 64 424 196 284 247 52 130 92 244 79 176 15 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.92 1.00 0.91 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 75 499 231 334 291 61 153 108 287 93 207 18 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 97 709 316 437 964 430 233 767 597 138 706 61 Arrive On Green 0.05 0.20 0.20 0.12 0.27 0.27 0.07 0.40 0.40 0.08 0.41 0.41 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1480 1810 1707 148 Grp Volume(v), veh/h 75 499 231 334 291 61 153 108 287 93 0 225 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1480 1810 0 1856 Q Serve(g_s), s 3.3 10.4 10.8 7.4 5.2 2.3 3.4 2.9 11.5 4.0 0.0 6.5 Cycle Q Clear(g_c), s 3.3 10.4 10.8 7.4 5.2 2.3 3.4 2.9 11.5 4.0 0.0 6.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.08
Lane Grp Cap(c), veh/h 97 709 316 437 964 430 233 767 597 138 0 767 V/C Ratio(X) 0.77 0.70 0.73 0.76 0.30 0.14 0.66 0.14 0.48 0.67 0.00 0.29 Avail Cap(c_a), veh/h 203 1124 501 525 1259 562 350 828 645 158 0 786 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 37.5 30.1 30.3 34.0 23.5 22.4 36.6 15.1 17.7 36.1 0.0 15.7 Incr Delay (d2), s/veh 12.0 1.3 3.3 5.5 0.2 0.1 3.1 0.1 0.6 9.1 0.0 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.7 4.2 4.1 3.2 2.0 0.8 1.5 1.1 3.5 2.0 0.0 2.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 49.4 31.4 33.5 39.5 23.6 22.6 39.7 15.2 18.3 45.2 0.0 15.9 LnGrp LOS D C C D C C D B B D B
Approach Vol, veh/h 805 686 548 318
Approach Delay, s/veh 33.7 31.3 23.7 24.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.1 36.4 14.0 19.8 9.3 37.2 8.3 25.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 35.0 12.0 25.0 8.0 34.0 9.0 28.0 Max Q Clear Time (g_c+I1), s 6.0 13.5 9.4 12.8 5.4 8.5 5.3 7.2 Green Ext Time (p_c), s 0.0 1.5 0.3 3.0 0.1 1.1 0.0 1.7 Intersection Summary
HCM 7th Control Delay, s/veh 29.4
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 56 597 25 41 259 73 42 50 131 231 37 82 Future Volume (veh/h) 56 597 25 41 259 73 42 50 131 231 37 82 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 70 746 31 51 324 91 52 62 164 289 46 102 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 115 1139 506 93 1096 487 183 334 281 430 467 390 Arrive On Green 0.06 0.32 0.32 0.05 0.30 0.30 0.05 0.18 0.18 0.12 0.25 0.25 Sat Flow, veh/h 1810 3610 1603 1810 3610 1602 3510 1900 1602 3510 1900 1584 Grp Volume(v), veh/h 70 746 31 51 324 91 52 62 164 289 46 102 Grp Sat Flow(s),veh/h/ln 1810 1805 1603 1810 1805 1602 1755 1900 1602 1755 1900 1584 Q Serve(g_s), s 1.8 8.5 0.6 1.3 3.3 2.0 0.7 1.3 4.5 3.8 0.9 2.5 Cycle Q Clear(g_c), s 1.8 8.5 0.6 1.3 3.3 2.0 0.7 1.3 4.5 3.8 0.9 2.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 115 1139 506 93 1096 487 183 334 281 430 467 390 V/C Ratio(X) 0.61 0.65 0.06 0.55 0.30 0.19 0.28 0.19 0.58 0.67 0.10 0.26 Avail Cap(c_a), veh/h 227 1964 872 189 1888 838 367 1391 1173 588 1511 1259 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.8 14.1 11.4 22.1 12.7 12.3 21.8 16.8 18.1 20.1 13.9 14.5 Incr Delay (d2), s/veh 5.2 0.6 0.1 4.9 0.1 0.2 0.8 0.3 1.9 1.8 0.1 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 2.6 0.2 0.6 1.0 0.5 0.3 0.5 1.5 1.4 0.3 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.0 14.8 11.5 27.1 12.9 12.5 22.6 17.1 20.0 21.9 14.0 14.9 LnGrp LOS C B B C B B C B C C B B
Approach Vol, veh/h 847 466 278 437
Approach Delay, s/veh 15.6 14.3 19.8 19.4
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.9 12.4 6.5 19.1 6.5 15.8 7.0 18.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 35.0 5.0 26.0 5.0 38.0 6.0 25.0 Max Q Clear Time (g_c+I1), s 5.8 6.5 3.3 10.5 2.7 4.5 3.8 5.3 Green Ext Time (p_c), s 0.2 0.8 0.0 4.1 0.0 0.5 0.0 2.0 Intersection Summary
HCM 7th Control Delay, s/veh 16.7
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 22 330 378 148 162 101 199 885 198 160 1175 26 Future Volume (veh/h) 22 330 378 148 162 101 199 885 198 160 1175 26 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 23 351 402 157 172 107 212 941 211 170 1250 28 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 89 1087 484 242 1787 547 307 1794 549 238 1691 518 Arrive On Green 0.03 0.30 0.30 0.07 0.34 0.34 0.09 0.35 0.35 0.07 0.33 0.33 Sat Flow, veh/h 3510 3610 1609 3510 5187 1587 3510 5187 1588 3510 5187 1588 Grp Volume(v), veh/h 23 351 402 157 172 107 212 941 211 170 1250 28 Grp Sat Flow(s),veh/h/ln 1755 1805 1609 1755 1729 1587 1755 1729 1588 1755 1729 1588 Q Serve(g_s), s 0.5 5.6 17.2 3.2 1.7 3.5 4.3 10.7 7.4 3.5 15.8 0.9 Cycle Q Clear(g_c), s 0.5 5.6 17.2 3.2 1.7 3.5 4.3 10.7 7.4 3.5 15.8 0.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 89 1087 484 242 1787 547 307 1794 549 238 1691 518 V/C Ratio(X) 0.26 0.32 0.83 0.65 0.10 0.20 0.69 0.52 0.38 0.72 0.74 0.05 Avail Cap(c_a), veh/h 238 1564 697 333 2387 731 475 2457 753 238 2106 645 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.3 20.0 24.1 33.5 16.4 17.0 32.7 19.3 18.2 33.7 22.1 17.1 Incr Delay (d2), s/veh 1.5 0.2 5.7 2.9 0.0 0.2 2.8 0.2 0.4 9.8 1.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 2.1 6.4 1.4 0.6 1.1 1.8 3.7 2.4 1.7 5.7 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.8 20.2 29.7 36.5 16.4 17.2 35.5 19.5 18.7 43.6 23.2 17.1 LnGrp LOS D C C D B B D B B D C B
Approach Vol, veh/h 776 436 1364 1448
Approach Delay, s/veh 25.6 23.8 21.9 25.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.0 29.6 9.1 26.2 10.5 28.1 5.9 29.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 7.0 32.0 10.0 30.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 5.5 12.7 5.2 19.2 6.3 17.8 2.5 5.5 Green Ext Time (p_c), s 0.0 6.8 0.1 2.8 0.2 6.2 0.0 1.3 Intersection Summary
HCM 7th Control Delay, s/veh 24.1
HCM 7th LOS C
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 49 1003 214 223 551 43 142 476 165 43 586 48 Future Volume (veh/h) 49 1003 214 223 551 43 142 476 165 43 586 48 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 52 1067 228 237 586 46 151 506 176 46 623 51 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 162 1341 597 333 1424 112 245 914 404 150 1173 361 Arrive On Green 0.05 0.37 0.37 0.09 0.42 0.42 0.07 0.25 0.25 0.04 0.23 0.23 Sat Flow, veh/h 3510 3610 1608 3510 3391 266 3510 3610 1597 3510 5187 1595 Grp Volume(v), veh/h 52 1067 228 237 311 321 151 506 176 46 623 51 Grp Sat Flow(s),veh/h/ln 1755 1805 1608 1755 1805 1852 1755 1805 1597 1755 1729 1595 Q Serve(g_s), s 1.0 17.8 7.0 4.4 8.1 8.2 2.8 8.2 6.2 0.9 7.1 1.7 Cycle Q Clear(g_c), s 1.0 17.8 7.0 4.4 8.1 8.2 2.8 8.2 6.2 0.9 7.1 1.7 Prop In Lane 1.00 1.00 1.00 0.14 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 162 1341 597 333 758 778 245 914 404 150 1173 361 V/C Ratio(X) 0.32 0.80 0.38 0.71 0.41 0.41 0.62 0.55 0.44 0.31 0.53 0.14 Avail Cap(c_a), veh/h 261 1555 693 365 831 853 261 1770 783 261 2543 782 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.1 18.9 15.5 29.6 13.7 13.7 30.4 21.8 21.1 31.2 22.9 20.8 Incr Delay (d2), s/veh 1.1 2.6 0.4 5.8 0.4 0.4 3.9 0.5 0.7 1.1 0.4 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 6.9 2.3 2.0 2.9 3.0 1.2 3.0 2.2 0.3 2.5 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 32.2 21.5 15.9 35.3 14.0 14.0 34.3 22.4 21.8 32.4 23.3 21.0 LnGrp LOS C C B D B B C C C C C C
Approach Vol, veh/h 1347 869 833 720
Approach Delay, s/veh 20.9 19.8 24.4 23.7
Approach LOS C B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.9 21.0 10.4 29.0 8.7 19.2 7.1 32.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 33.0 7.0 29.0 5.0 33.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 2.9 10.2 6.4 19.8 4.8 9.1 3.0 10.2 Green Ext Time (p_c), s 0.0 3.4 0.0 5.1 0.0 3.9 0.0 3.5 Intersection Summary
HCM 7th Control Delay, s/veh 22.0
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 146 828 152 144 526 43 193 592 129 170 705 177 Future Volume (veh/h) 146 828 152 144 526 43 193 592 129 170 705 177 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 154 872 160 152 554 45 203 623 136 179 742 186 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 266 1694 518 265 1693 511 307 1326 411 284 1292 401 Arrive On Green 0.08 0.33 0.33 0.08 0.33 0.33 0.09 0.26 0.26 0.08 0.25 0.25 Sat Flow, veh/h 3510 5187 1587 3510 5187 1565 3510 5187 1608 3510 5187 1608 Grp Volume(v), veh/h 154 872 160 152 554 45 203 623 136 179 742 186 Grp Sat Flow(s),veh/h/ln 1755 1729 1587 1755 1729 1565 1755 1729 1608 1755 1729 1608 Q Serve(g_s), s 2.6 8.3 4.6 2.6 4.9 1.2 3.4 6.2 4.2 3.0 7.7 6.0 Cycle Q Clear(g_c), s 2.6 8.3 4.6 2.6 4.9 1.2 3.4 6.2 4.2 3.0 7.7 6.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 266 1694 518 265 1693 511 307 1326 411 284 1292 401 V/C Ratio(X) 0.58 0.51 0.31 0.57 0.33 0.09 0.66 0.47 0.33 0.63 0.57 0.46 Avail Cap(c_a), veh/h 344 2627 804 344 2627 793 402 2797 867 516 2966 920 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.3 16.7 15.4 27.3 15.5 14.3 27.1 19.3 18.5 27.2 20.1 19.5 Incr Delay (d2), s/veh 2.0 0.2 0.3 2.0 0.1 0.1 2.5 0.3 0.5 2.3 0.4 0.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 2.8 1.4 1.0 1.6 0.4 1.3 2.1 1.4 1.2 2.6 2.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.3 16.9 15.8 29.3 15.7 14.4 29.6 19.5 19.0 29.5 20.5 20.3 LnGrp LOS C B B C B B C B B C C C
Approach Vol, veh/h 1186 751 962 1107
Approach Delay, s/veh 18.4 18.3 21.6 22.0
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.0 19.6 8.6 24.0 9.3 19.2 8.6 24.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 9.0 33.0 6.0 31.0 7.0 35.0 6.0 31.0 Max Q Clear Time (g_c+I1), s 5.0 8.2 4.6 10.3 5.4 9.7 4.6 6.9 Green Ext Time (p_c), s 0.2 4.2 0.1 6.1 0.1 5.2 0.1 3.5 Intersection Summary
HCM 7th Control Delay, s/veh 20.1
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/21/2025 Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 43 91 272 155 106 59 174 844 205 44 895 18 Future Volume (veh/h) 43 91 272 155 106 59 174 844 205 44 895 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 47 99 296 168 115 64 189 917 223 48 973 20 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 81 457 379 212 594 494 235 1397 338 82 1302 403 Arrive On Green 0.04 0.24 0.24 0.12 0.31 0.31 0.13 0.34 0.34 0.05 0.25 0.25 Sat Flow, veh/h 1810 1900 1576 1810 1900 1579 1810 4164 1009 1810 5187 1604 Grp Volume(v), veh/h 47 99 296 168 115 64 189 761 379 48 973 20 Grp Sat Flow(s),veh/h/ln 1810 1900 1576 1810 1900 1579 1810 1729 1715 1810 1729 1604 Q Serve(g_s), s 1.6 2.6 10.8 5.5 2.7 1.8 6.2 11.5 11.5 1.6 10.6 0.6 Cycle Q Clear(g_c), s 1.6 2.6 10.8 5.5 2.7 1.8 6.2 11.5 11.5 1.6 10.6 0.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.59 1.00 1.00
Lane Grp Cap(c), veh/h 81 457 379 212 594 494 235 1160 575 82 1302 403 V/C Ratio(X) 0.58 0.22 0.78 0.79 0.19 0.13 0.80 0.66 0.66 0.58 0.75 0.05 Avail Cap(c_a), veh/h 148 683 566 266 807 671 296 1299 644 148 1525 472 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.7 18.6 21.7 26.3 15.4 15.1 25.9 17.3 17.4 28.6 21.1 17.4 Incr Delay (d2), s/veh 6.3 0.2 4.1 12.2 0.2 0.1 12.0 1.0 2.1 6.4 1.7 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 1.0 3.8 2.8 1.0 0.6 3.1 3.7 3.9 0.7 3.7 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.0 18.9 25.8 38.6 15.6 15.2 37.8 18.4 19.5 35.0 22.9 17.4 LnGrp LOS C B C D B B D B B C C B
Approach Vol, veh/h 442 347 1329 1041
Approach Delay, s/veh 25.2 26.6 21.4 23.3
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.8 24.5 11.2 18.7 12.0 19.4 6.8 23.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 23.0 9.0 22.0 10.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.6 13.5 7.5 12.8 8.2 12.6 3.6 4.7 Green Ext Time (p_c), s 0.0 4.5 0.1 1.0 0.1 2.7 0.0 0.7 Intersection Summary
HCM 7th Control Delay, s/veh 23.2
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 17 4 32 85 10 48 49 1201 117 60 1227 27 Future Volume (veh/h) 17 4 32 85 10 48 49 1201 117 60 1227 27 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 19 4 35 93 11 53 54 1320 129 66 1348 30 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 43 21 183 273 340 284 100 1885 583 115 1927 583 Arrive On Green 0.02 0.12 0.12 0.08 0.18 0.18 0.06 0.36 0.36 0.06 0.37 0.37 Sat Flow, veh/h 1810 168 1468 3510 1900 1589 1810 5187 1604 1810 5187 1570 Grp Volume(v), veh/h 19 0 39 93 11 53 54 1320 129 66 1348 30 Grp Sat Flow(s),veh/h/ln 1810 0 1636 1755 1900 1589 1810 1729 1604 1810 1729 1570 Q Serve(g_s), s 0.4 0.0 0.9 1.1 0.2 1.2 1.3 9.4 2.4 1.5 9.5 0.5 Cycle Q Clear(g_c), s 0.4 0.0 0.9 1.1 0.2 1.2 1.3 9.4 2.4 1.5 9.5 0.5 Prop In Lane 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 43 0 204 273 340 284 100 1885 583 115 1927 583 V/C Ratio(X) 0.44 0.00 0.19 0.34 0.03 0.19 0.54 0.70 0.22 0.58 0.70 0.05 Avail Cap(c_a), veh/h 210 0 985 407 1145 957 210 2163 669 210 2163 655 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 20.8 0.0 16.9 18.8 14.6 15.1 19.9 11.7 9.5 19.6 11.5 8.7 Incr Delay (d2), s/veh 7.1 0.0 0.5 0.7 0.0 0.3 4.5 0.9 0.2 4.5 0.9 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 0.3 0.4 0.1 0.4 0.5 2.3 0.6 0.6 2.3 0.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.9 0.0 17.4 19.6 14.7 15.4 24.3 12.6 9.7 24.1 12.4 8.7 LnGrp LOS C B B B B C B A C B A
Approach Vol, veh/h 58 157 1503 1444
Approach Delay, s/veh 20.8 17.8 12.8 12.9
Approach LOS C B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.7 19.7 7.4 9.4 6.4 20.0 5.0 11.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 18.0 5.0 26.0 5.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.5 11.4 3.1 2.9 3.3 11.5 2.4 3.2 Green Ext Time (p_c), s 0.0 4.2 0.0 0.1 0.0 4.1 0.0 0.2 Intersection Summary
HCM 7th Control Delay, s/veh 13.2
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 137 0 189 0 0 0 177 1239 0 0 1170 171 Future Volume (veh/h) 137 0 189 0 0 0 177 1239 0 0 1170 171 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 152 0 210 0 0 0 197 1377 0 0 1300 190 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 1040 0 319 0 377 0 250 3168 0 0 1955 607
Arrive On Green 0.20 0.00 0.20 0.00 0.00 0.00 0.14 0.61 0.00 0.00 0.38 0.38 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 152 0 210 0 0 0 197 1377 0 0 1300 190 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 1.5 0.0 5.0 0.0 0.0 0.0 4.4 5.9 0.0 0.0 8.7 3.5 Cycle Q Clear(g_c), s 1.5 0.0 5.0 0.0 0.0 0.0 4.4 5.9 0.0 0.0 8.7 3.5 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 1040 0 319 0 377 0 250 3168 0 0 1955 607 V/C Ratio(X) 0.15 0.00 0.66 0.00 0.00 0.00 0.79 0.43 0.00 0.00 0.66 0.31 Avail Cap(c_a), veh/h 2187 0 846 0 998 0 302 3715 0 0 2353 730 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 14.1 0.0 15.5 0.0 0.0 0.0 17.5 4.3 0.0 0.0 10.8 9.2 Incr Delay (d2), s/veh 0.1 0.0 2.3 0.0 0.0 0.0 10.9 0.1 0.0 0.0 0.5 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 1.5 0.0 0.0 0.0 2.1 0.4 0.0 0.0 2.0 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 14.1 0.0 17.8 0.0 0.0 0.0 28.3 4.4 0.0 0.0 11.4 9.5 LnGrp LOS B B C A B A
Approach Vol, veh/h 362 0 1574 1490
Approach Delay, s/veh 16.2 0.0 7.4 11.2
Approach LOS B A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 29.6 12.3 9.8 19.8 12.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 30.0 22.0 7.0 19.0 22.0
Max Q Clear Time (g_c+I1), s 7.9 7.0 6.4 10.7 0.0
Green Ext Time (p_c), s 9.2 1.4 0.0 5.1 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 10.0
HCM 7th LOS A
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Jet Way 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 60 12 1719 73 10 1598
Future Volume (veh/h) 60 12 1719 73 10 1598
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 71 14 2022 86 12 1880
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 135 120 3085 958 39 3691
Arrive On Green 0.07 0.07 0.59 0.59 0.02 0.71
Sat Flow, veh/h 1810 1610 5358 1610 1810 5358
Grp Volume(v), veh/h 71 14 2022 86 12 1880
Grp Sat Flow(s),veh/h/ln 1810 1610 1729 1610 1810 1729
Q Serve(g_s), s 1.6 0.3 10.9 1.0 0.3 6.9
Cycle Q Clear(g_c), s 1.6 0.3 10.9 1.0 0.3 6.9
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 135 120 3085 958 39 3691
V/C Ratio(X) 0.52 0.12 0.66 0.09 0.30 0.51
Avail Cap(c_a), veh/h 1074 956 3695 1147 301 5049
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 18.8 18.2 5.7 3.7 20.3 2.7
Incr Delay (d2), s/veh 3.1 0.4 0.3 0.0 4.3 0.1
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 0.1 0.9 0.2 0.1 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.9 18.6 6.0 3.7 24.6 2.9
LnGrp LOS C B A A C A
Approach Vol, veh/h 85 2108 1892
Approach Delay, s/veh 21.3 5.9 3.0
Approach LOS C A A
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 4.9 29.1 34.0 8.2
Change Period (Y+Rc), s 4.0 4.0 4.0 5.0
Max Green Setting (Gmax), s 7.0 30.0 41.0 25.0
Max Q Clear Time (g_c+I1), s 2.3 12.9 8.9 3.6
Green Ext Time (p_c), s 0.0 12.1 16.4 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 4.9
HCM 7th LOS A
h 7 1 7 " 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 300 203 0 1665 1653 611
Future Volume (veh/h) 300 203 0 1665 1653 611
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 370 186 0 1850 1837 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 675 300 0 3209 3209
Arrive On Green 0.19 0.19 0.00 0.62 0.62 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 370 186 0 1850 1837 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 3.8 4.4 0.0 8.7 8.6 0.0
Cycle Q Clear(g_c), s 3.8 4.4 0.0 8.7 8.6 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 675 300 0 3209 3209
V/C Ratio(X) 0.55 0.62 0.00 0.58 0.57
Avail Cap(c_a), veh/h 1235 549 0 4803 4803
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 15.1 15.4 0.0 4.6 4.6 0.0
Incr Delay (d2), s/veh 0.7 2.1 0.0 0.2 0.2 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.4 1.5 0.0 0.4 0.4 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 15.8 17.4 0.0 4.8 4.8 0.0
LnGrp LOS B B A A
Approach Vol, veh/h 556 1850 1837
Approach Delay, s/veh 16.4 4.8 4.8
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 29.4 11.7 29.4
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 38.0 14.0 38.0
Max Q Clear Time (g_c+I1), s 10.7 6.4 10.6
Green Ext Time (p_c), s 14.7 1.3 14.6
Intersection Summary
HCM 7th Control Delay, s/veh 6.3
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 411 0 72 0 1594 724 374 1478 0 Future Volume (veh/h) 0 0 0 411 0 72 0 1594 724 374 1478 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 462 0 81 0 1791 813 420 1661 0 Peak Hour Factor 0.95 0.95 0.95 0.89 0.95 0.89 0.95 0.89 0.89 0.89 0.89 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 3 0 642 0 572 0 2342 1004 538 3513 0
Arrive On Green 0.00 0.00 0.00 0.18 0.00 0.18 0.00 0.45 0.45 0.15 0.68 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 462 0 81 0 1791 813 420 1661 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 6.6 0.0 1.2 0.0 15.9 21.4 6.3 8.4 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 6.6 0.0 1.2 0.0 15.9 21.4 6.3 8.4 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 3 0 642 0 572 0 2342 1004 538 3513 0 V/C Ratio(X) 0.00 0.00 0.00 0.72 0.00 0.14 0.00 0.76 0.81 0.78 0.47 0.00 Avail Cap(c_a), veh/h 0 238 0 1182 0 1694 0 2353 1007 573 3576 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 21.4 0.0 19.1 0.0 12.7 7.8 22.4 4.2 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 1.5 0.0 0.1 0.0 1.5 5.0 6.5 0.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 2.5 0.0 0.4 0.0 4.3 4.9 2.6 0.8 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 22.9 0.0 19.2 0.0 14.2 12.8 28.9 4.3 0.0 LnGrp LOS C B B B C A
Approach Vol, veh/h 0 543 2604 2081
Approach Delay, s/veh 0.0 22.4 13.8 9.3
Approach LOS C B A
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 12.4 28.9 13.8 0.0 41.3 13.8
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 9.0 25.0 18.0 7.0 38.0 29.0 Max Q Clear Time (g_c+I1), s 8.3 23.4 8.6 0.0 10.4 3.2
Green Ext Time (p_c), s 0.1 1.5 1.2 0.0 12.9 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 12.9
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/21/2025 Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 158 324 63 199 522 325 243 1599 163 260 965 440 Future Volume (veh/h) 158 324 63 199 522 325 243 1599 163 260 965 440 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 178 364 71 224 587 365 273 1797 183 292 1084 494 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 227 1289 395 291 1384 424 344 2012 204 352 2193 681 Arrive On Green 0.06 0.25 0.25 0.08 0.27 0.27 0.10 0.42 0.42 0.10 0.42 0.42 Sat Flow, veh/h 3510 5187 1589 3510 5187 1588 3510 4785 485 3510 5187 1610 Grp Volume(v), veh/h 178 364 71 224 587 365 273 1296 684 292 1084 494 Grp Sat Flow(s),veh/h/ln 1755 1729 1589 1755 1729 1588 1755 1729 1813 1755 1729 1610 Q Serve(g_s), s 5.4 6.1 3.8 6.8 10.1 23.7 8.2 37.6 38.0 8.8 16.5 27.7 Cycle Q Clear(g_c), s 5.4 6.1 3.8 6.8 10.1 23.7 8.2 37.6 38.0 8.8 16.5 27.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.27 1.00 1.00
Lane Grp Cap(c), veh/h 227 1289 395 291 1384 424 344 1454 762 352 2193 681 V/C Ratio(X) 0.78 0.28 0.18 0.77 0.42 0.86 0.79 0.89 0.90 0.83 0.49 0.73 Avail Cap(c_a), veh/h 227 1390 426 389 1629 499 486 1501 787 357 2193 681 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 49.9 32.9 32.0 48.6 32.8 37.8 47.8 29.1 29.2 47.8 22.8 26.0 Incr Delay (d2), s/veh 16.3 0.1 0.2 6.5 0.2 12.7 5.9 7.0 12.8 14.9 0.2 3.9 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.8 2.5 1.4 3.1 4.1 10.3 3.7 15.3 17.4 4.4 6.1 10.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 66.2 33.0 32.2 55.2 33.0 50.5 53.7 36.1 42.0 62.7 23.0 29.9 LnGrp LOS E C C E C D D D D E C C
Approach Vol, veh/h 613 1176 2253 1870
Approach Delay, s/veh 42.5 42.7 40.0 31.0
Approach LOS D D D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.9 49.5 13.0 30.9 14.6 49.8 11.0 32.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 47.0 12.0 29.0 15.0 43.0 7.0 34.0 Max Q Clear Time (g_c+I1), s 10.8 40.0 8.8 8.1 10.2 29.7 7.4 25.7 Green Ext Time (p_c), s 0.0 5.5 0.2 2.3 0.4 6.9 0.0 3.2 Intersection Summary
HCM 7th Control Delay, s/veh 37.9
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 200 0 244 0 0 0 104 616 0 0 1016 113 Future Volume (veh/h) 200 0 244 0 0 0 104 616 0 0 1016 113 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 217 0 265 0 0 0 113 670 0 0 1104 123 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 608 0 0 0 5 0 331 3126 0 0 2055 630
Arrive On Green 0.17 0.00 0.00 0.00 0.00 0.00 0.09 0.60 0.00 0.00 0.40 0.40 Sat Flow, veh/h 3510 217 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 217 13.4 0 0 0 113 670 0 0 1104 123 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 1.9 0.0 0.0 0.0 1.1 2.1 0.0 0.0 5.8 1.8 Cycle Q Clear(g_c), s 1.9 0.0 0.0 0.0 1.1 2.1 0.0 0.0 5.8 1.8 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 608 0 5 0 331 3126 0 0 2055 630
V/C Ratio(X) 0.36 0.00 0.00 0.00 0.34 0.21 0.00 0.00 0.54 0.20 Avail Cap(c_a), veh/h 2753 0 1543 0 492 4504 0 0 3196 979 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 13.0 0.0 0.0 0.0 15.1 3.2 0.0 0.0 8.3 7.1 Incr Delay (d2), s/veh 0.4 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.2 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 0.0 0.0 0.3 0.0 0.0 0.0 1.1 0.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.4 0.0 0.0 0.0 15.7 3.3 0.0 0.0 8.5 7.2 LnGrp LOS B B A A A
Approach Vol, veh/h 0 783 1227
Approach Delay, s/veh 0.0 5.1 8.4
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 25.5 7.4 18.1 10.2 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 4.1 3.1 7.8 3.9 0.0
Green Ext Time (p_c), s 4.3 0.0 6.2 0.7 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.7
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 135 793 182 207 388 161 85 481 192 388 773 92 Future Volume (veh/h) 135 793 182 207 388 161 85 481 192 388 773 92 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.98 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 145 853 196 223 417 173 91 517 206 417 831 99 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 253 1537 467 274 1568 477 220 1140 348 548 1625 497 Arrive On Green 0.07 0.30 0.30 0.08 0.30 0.30 0.06 0.22 0.22 0.16 0.31 0.31 Sat Flow, veh/h 3510 5187 1576 3510 5187 1578 3510 5187 1585 3510 5187 1587 Grp Volume(v), veh/h 145 853 196 223 417 173 91 517 206 417 831 99 Grp Sat Flow(s),veh/h/ln 1755 1729 1576 1755 1729 1578 1755 1729 1585 1755 1729 1587 Q Serve(g_s), s 2.6 8.9 6.4 4.0 3.9 5.5 1.6 5.5 7.5 7.3 8.4 2.9 Cycle Q Clear(g_c), s 2.6 8.9 6.4 4.0 3.9 5.5 1.6 5.5 7.5 7.3 8.4 2.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 253 1537 467 274 1568 477 220 1140 348 548 1625 497 V/C Ratio(X) 0.57 0.56 0.42 0.81 0.27 0.36 0.41 0.45 0.59 0.76 0.51 0.20 Avail Cap(c_a), veh/h 274 2753 837 274 2753 838 329 2834 866 548 3158 966 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.8 19.0 18.1 29.1 17.0 17.5 28.9 21.7 22.4 25.9 18.0 16.1 Incr Delay (d2), s/veh 2.5 0.3 0.6 16.9 0.1 0.5 1.2 0.3 1.6 6.2 0.3 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 3.1 2.1 2.2 1.3 1.8 0.6 2.0 2.6 3.1 2.8 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 31.2 19.3 18.7 46.0 17.0 18.0 30.1 21.9 24.0 32.1 18.2 16.3 LnGrp LOS C B B D B B C C C C B B
Approach Vol, veh/h 1194 813 814 1347
Approach Delay, s/veh 20.6 25.2 23.4 22.4
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.0 18.1 9.0 23.0 8.0 24.1 8.6 23.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 35.0 5.0 34.0 6.0 39.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 9.3 9.5 6.0 10.9 3.6 10.4 4.6 7.5 Green Ext Time (p_c), s 0.1 3.9 0.0 6.4 0.0 5.9 0.0 3.2 Intersection Summary
HCM 7th Control Delay, s/veh 22.6
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 57 87 181 84 36 71 96 677 60 52 1078 55 Future Volume (veh/h) 57 87 181 84 36 71 96 677 60 52 1078 55 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 64 98 203 94 40 80 108 761 67 58 1211 62 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 100 332 282 122 355 296 140 2046 621 95 1918 582 Arrive On Green 0.06 0.17 0.17 0.07 0.19 0.19 0.08 0.39 0.39 0.05 0.37 0.37 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 64 98 203 94 40 80 108 761 67 58 1211 62 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 2.0 2.6 6.9 3.0 1.0 2.5 3.4 6.0 1.6 1.8 11.1 1.5 Cycle Q Clear(g_c), s 2.0 2.6 6.9 3.0 1.0 2.5 3.4 6.0 1.6 1.8 11.1 1.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 100 332 282 122 355 296 140 2046 621 95 1918 582 V/C Ratio(X) 0.64 0.29 0.72 0.77 0.11 0.27 0.77 0.37 0.11 0.61 0.63 0.11 Avail Cap(c_a), veh/h 281 1280 1084 188 1181 987 219 3046 925 250 3135 952 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.8 20.8 22.5 26.6 19.6 20.2 26.2 12.4 11.1 26.9 15.0 12.0 Incr Delay (d2), s/veh 6.5 0.5 3.5 9.9 0.1 0.5 8.8 0.1 0.1 6.2 0.3 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 1.1 2.7 1.5 0.4 0.9 1.6 1.8 0.5 0.8 3.4 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 33.3 21.3 26.0 36.5 19.7 20.6 35.0 12.6 11.2 33.1 15.4 12.1 LnGrp LOS C C C D B C C B B C B B
Approach Vol, veh/h 365 214 936 1331
Approach Delay, s/veh 26.0 27.4 15.0 16.0
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.0 26.8 7.9 16.1 8.5 25.4 7.2 16.8 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 8.0 34.0 6.0 39.0 7.0 35.0 9.0 36.0 Max Q Clear Time (g_c+I1), s 3.8 8.0 5.0 8.9 5.4 13.1 4.0 4.5 Green Ext Time (p_c), s 0.0 5.1 0.0 1.2 0.0 8.3 0.0 0.5 Intersection Summary
HCM 7th Control Delay, s/veh 17.8
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 24 993 6 3 1494 24 9 2 2 50 0 47 Future Volume (veh/h) 24 993 6 3 1494 24 9 2 2 50 0 47
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 26 1079 7 3 1624 26 10 2 2 54 0 51 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 58 2496 16 7 2322 37 359 72 43 265 43 148
Arrive On Green 0.03 0.47 0.47 0.00 0.44 0.44 0.19 0.19 0.19 0.19 0.00 0.19 Sat Flow, veh/h 1810 5317 34 1810 5256 84 969 373 224 586 223 764 Grp Volume(v), veh/h 26 702 384 3 1068 582 14 0 0 105 0 0 Grp Sat Flow(s),veh/h/ln 1810 1729 1894 1810 1729 1882 1565 0 0 1573 0 0 Q Serve(g_s), s 0.5 4.9 4.9 0.1 9.0 9.0 0.0 0.0 0.0 0.1 0.0 0.0 Cycle Q Clear(g_c), s 0.5 4.9 4.9 0.1 9.0 9.0 0.2 0.0 0.0 1.9 0.0 0.0 Prop In Lane 1.00 0.02 1.00 0.04 0.71 0.14 0.51 0.49
Lane Grp Cap(c), veh/h 58 1623 889 7 1527 831 475 0 0 456 0 0 V/C Ratio(X) 0.45 0.43 0.43 0.40 0.70 0.70 0.03 0.00 0.00 0.23 0.00 0.00 Avail Cap(c_a), veh/h 251 1725 945 251 1725 939 1205 0 0 1212 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 17.2 6.4 6.4 17.9 8.1 8.1 11.8 0.0 0.0 12.5 0.0 0.0 Incr Delay (d2), s/veh 5.5 0.2 0.3 31.7 1.1 2.0 0.0 0.0 0.0 0.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.7 0.8 0.1 1.6 2.0 0.1 0.0 0.0 0.6 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 22.6 6.6 6.7 49.7 9.2 10.1 11.8 0.0 0.0 12.7 0.0 0.0 LnGrp LOS C A A D A B B B
Approach Vol, veh/h 1112 1653 14 105
Approach Delay, s/veh 7.0 9.6 11.8 12.7
Approach LOS A A B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.1 20.9 11.0 5.1 19.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.2 2.1 6.9 3.9 2.5 11.0
Green Ext Time (p_c), s 0.0 0.0 4.7 0.5 0.0 4.9
Intersection Summary
HCM 7th Control Delay, s/veh 8.7
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 189 676 368 245 943 244 405 1425 198 250 1136 175 Future Volume (veh/h) 189 676 368 245 943 244 405 1425 198 250 1136 175 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 195 697 379 253 972 252 418 1469 204 258 1171 180 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 338 1452 445 272 1354 563 408 1730 661 322 1603 652 Arrive On Green 0.10 0.30 0.30 0.08 0.28 0.28 0.12 0.36 0.36 0.10 0.33 0.33 Sat Flow, veh/h 3291 4863 1490 3291 4863 1490 3291 4863 1508 3291 4863 1508 Grp Volume(v), veh/h 195 697 379 253 972 252 418 1469 204 258 1171 180 Grp Sat Flow(s),veh/h/ln 1646 1621 1490 1646 1621 1490 1646 1621 1508 1646 1621 1508 Q Serve(g_s), s 5.5 11.4 23.2 7.4 17.4 12.3 12.0 27.0 8.5 7.4 20.6 7.4 Cycle Q Clear(g_c), s 5.5 11.4 23.2 7.4 17.4 12.3 12.0 27.0 8.5 7.4 20.6 7.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 338 1452 445 272 1354 563 408 1730 661 322 1603 652 V/C Ratio(X) 0.58 0.48 0.85 0.93 0.72 0.45 1.02 0.85 0.31 0.80 0.73 0.28 Avail Cap(c_a), veh/h 340 1708 523 272 1608 640 408 1859 701 340 1758 700 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.4 27.8 31.9 44.1 31.5 22.7 42.4 28.8 17.7 42.7 28.6 17.7 Incr Delay (d2), s/veh 2.4 0.2 11.3 36.4 1.3 0.6 50.9 3.7 0.3 12.3 1.4 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.2 4.1 9.1 4.2 6.5 4.0 7.4 9.9 2.7 3.4 7.4 2.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 43.8 28.1 43.2 80.5 32.8 23.2 93.3 32.5 17.9 55.1 30.1 17.9 LnGrp LOS D C D F C C F C B E C B
Approach Vol, veh/h 1271 1477 2091 1609
Approach Delay, s/veh 35.0 39.3 43.2 32.7
Approach LOS C D D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.5 38.4 12.0 32.9 16.0 35.9 13.9 30.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 37.0 8.0 34.0 12.0 35.0 10.0 32.0 Max Q Clear Time (g_c+I1), s 9.4 29.0 9.4 25.2 14.0 22.6 7.5 19.4 Green Ext Time (p_c), s 0.1 5.4 0.0 3.7 0.0 6.2 0.1 5.6 Intersection Summary
HCM 7th Control Delay, s/veh 38.1
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Rosedale Highway & NW Promenade 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 150 1126 1358 134 168 106
Future Volume (veh/h) 150 1126 1358 134 168 106
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 155 1161 1400 138 173 109
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 360 3287 2239 694 586 269
Arrive On Green 0.10 0.63 0.43 0.43 0.17 0.17
Sat Flow, veh/h 3510 5358 5358 1608 3510 1610
Grp Volume(v), veh/h 155 1161 1400 138 173 109
Grp Sat Flow(s),veh/h/ln 1755 1729 1729 1608 1755 1610
Q Serve(g_s), s 1.7 4.2 8.4 2.1 1.7 2.4
Cycle Q Clear(g_c), s 1.7 4.2 8.4 2.1 1.7 2.4
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 360 3287 2239 694 586 269
V/C Ratio(X) 0.43 0.35 0.63 0.20 0.30 0.41
Avail Cap(c_a), veh/h 437 4007 2844 882 2712 1244
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 16.9 3.5 8.9 7.1 14.6 14.9
Incr Delay (d2), s/veh 0.8 0.1 0.3 0.1 0.3 1.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 0.2 1.7 0.0 0.6 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.7 3.5 9.2 7.2 14.9 15.9
LnGrp LOS B A A A B B
Approach Vol, veh/h 1316 1538 282
Approach Delay, s/veh 5.2 9.0 15.3
Approach LOS A A B
Timer - Assigned Phs 4 6 7 8
Phs Duration (G+Y+Rc), s 29.4 10.7 8.1 21.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 31.0 5.0 22.0
Max Q Clear Time (g_c+I1), s 6.2 4.4 3.7 10.4
Green Ext Time (p_c), s 8.0 0.9 0.1 6.9
Intersection Summary
HCM 7th Control Delay, s/veh 8.0
HCM 7th LOS A
" +++ 1 7 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 146 1016 21 60 1254 144 21 21 32 221 37 156 Future Volume (veh/h) 146 1016 21 60 1254 144 21 21 32 221 37 156 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 149 1037 21 61 1280 147 21 21 33 226 38 159 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 296 2095 650 102 1948 605 88 482 213 357 758 332 Arrive On Green 0.08 0.40 0.40 0.06 0.38 0.38 0.03 0.13 0.13 0.10 0.21 0.21 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1599 3510 3610 1581 Grp Volume(v), veh/h 149 1037 21 61 1280 147 21 21 33 226 38 159 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1599 1755 1805 1581 Q Serve(g_s), s 2.1 7.8 0.4 1.7 10.7 3.3 0.3 0.3 1.0 3.2 0.4 4.6 Cycle Q Clear(g_c), s 2.1 7.8 0.4 1.7 10.7 3.3 0.3 0.3 1.0 3.2 0.4 4.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 296 2095 650 102 1948 605 88 482 213 357 758 332 V/C Ratio(X) 0.50 0.50 0.03 0.60 0.66 0.24 0.24 0.04 0.15 0.63 0.05 0.48 Avail Cap(c_a), veh/h 401 2570 798 207 2570 798 334 2201 975 669 2545 1115 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 23.0 11.7 9.4 24.2 13.6 11.3 25.1 19.8 20.1 22.6 16.5 18.2 Incr Delay (d2), s/veh 1.3 0.2 0.0 5.6 0.4 0.2 1.4 0.0 0.3 1.9 0.0 1.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 2.1 0.1 0.8 3.1 0.9 0.1 0.1 0.3 1.3 0.2 1.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 24.3 11.8 9.5 29.8 14.0 11.5 26.5 19.9 20.5 24.5 16.6 19.3 LnGrp LOS C B A C B B C B C C B B
Approach Vol, veh/h 1207 1488 75 423
Approach Delay, s/veh 13.3 14.4 22.0 21.8
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.3 11.0 6.9 25.2 5.3 15.0 8.4 23.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 32.0 6.0 26.0 5.0 37.0 6.0 26.0 Max Q Clear Time (g_c+I1), s 5.2 3.0 3.7 9.8 2.3 6.6 4.1 12.7 Green Ext Time (p_c), s 0.3 0.2 0.0 6.0 0.0 0.7 0.1 7.0 Intersection Summary
HCM 7th Control Delay, s/veh 15.1
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 240 906 367 239 600 143 325 1098 355 139 919 210 Future Volume (veh/h) 240 906 367 239 600 143 325 1098 355 139 919 210 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 242 915 371 241 606 144 328 1109 359 140 928 212 Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 225 1500 465 263 1556 482 338 1819 564 208 1133 498 Arrive On Green 0.07 0.31 0.31 0.08 0.32 0.32 0.10 0.37 0.37 0.06 0.33 0.33 Sat Flow, veh/h 3319 4904 1519 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 242 915 371 241 606 144 328 1109 359 140 928 212 Grp Sat Flow(s),veh/h/ln 1659 1635 1519 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 6.0 14.1 19.8 6.4 8.5 6.3 8.7 16.2 17.2 3.6 22.0 9.7 Cycle Q Clear(g_c), s 6.0 14.1 19.8 6.4 8.5 6.3 8.7 16.2 17.2 3.6 22.0 9.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 225 1500 465 263 1556 482 338 1819 564 208 1133 498 V/C Ratio(X) 1.07 0.61 0.80 0.92 0.39 0.30 0.97 0.61 0.64 0.67 0.82 0.43 Avail Cap(c_a), veh/h 225 1776 550 263 1832 568 338 2054 637 301 1391 612 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.2 26.2 28.2 40.4 23.5 22.8 39.5 22.6 22.9 40.5 27.1 23.0 Incr Delay (d2), s/veh 80.9 0.4 7.0 34.2 0.2 0.3 40.8 0.4 1.7 3.7 3.3 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.8 5.0 7.4 3.7 3.0 2.1 5.2 5.6 5.7 1.5 8.6 3.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 122.1 26.6 35.1 74.6 23.7 23.1 80.4 23.0 24.6 44.3 30.4 23.5 LnGrp LOS F C D E C C F C C D C C
Approach Vol, veh/h 1528 991 1796 1280
Approach Delay, s/veh 43.8 36.0 33.8 30.8
Approach LOS D D C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.5 36.8 11.0 31.0 13.0 33.3 10.0 32.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 37.0 7.0 32.0 9.0 36.0 6.0 33.0 Max Q Clear Time (g_c+I1), s 5.6 18.2 8.4 21.8 10.7 24.0 8.0 10.5 Green Ext Time (p_c), s 0.1 5.3 0.0 5.0 0.0 5.1 0.0 4.2 Intersection Summary
HCM 7th Control Delay, s/veh 36.2
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 111 745 20 21 1007 278 47 38 28 179 46 114 Future Volume (veh/h) 111 745 20 21 1007 278 47 38 28 179 46 114 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 116 776 21 22 1049 290 49 40 29 186 48 119 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 149 2114 653 47 1268 562 87 272 229 237 429 362 Arrive On Green 0.08 0.41 0.41 0.03 0.35 0.35 0.05 0.14 0.14 0.13 0.23 0.23 Sat Flow, veh/h 1810 5187 1602 1810 3610 1601 1810 1900 1600 1810 1900 1604 Grp Volume(v), veh/h 116 776 21 22 1049 290 49 40 29 186 48 119 Grp Sat Flow(s),veh/h/ln 1810 1729 1602 1810 1805 1601 1810 1900 1600 1810 1900 1604 Q Serve(g_s), s 3.4 5.7 0.4 0.7 14.5 7.8 1.4 1.0 0.9 5.4 1.1 3.4 Cycle Q Clear(g_c), s 3.4 5.7 0.4 0.7 14.5 7.8 1.4 1.0 0.9 5.4 1.1 3.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 149 2114 653 47 1268 562 87 272 229 237 429 362 V/C Ratio(X) 0.78 0.37 0.03 0.47 0.83 0.52 0.56 0.15 0.13 0.79 0.11 0.33 Avail Cap(c_a), veh/h 165 2114 653 165 1453 644 165 904 761 364 1112 939 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.6 11.3 9.7 26.3 16.2 14.1 25.5 20.5 20.4 23.0 16.8 17.7 Incr Delay (d2), s/veh 18.9 0.1 0.0 7.1 3.7 0.7 5.6 0.2 0.2 6.1 0.1 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.0 1.6 0.1 0.3 5.1 2.2 0.7 0.4 0.3 2.5 0.4 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 43.5 11.4 9.7 33.3 19.9 14.8 31.1 20.8 20.7 29.1 16.9 18.2 LnGrp LOS D B A C B B C C C C B B
Approach Vol, veh/h 913 1361 118 353
Approach Delay, s/veh 15.4 19.0 25.0 23.8
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.2 11.8 5.4 26.3 6.6 16.3 8.5 23.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 26.0 5.0 22.0 5.0 32.0 5.0 22.0 Max Q Clear Time (g_c+I1), s 7.4 3.0 2.7 7.7 3.4 5.4 5.4 16.5 Green Ext Time (p_c), s 0.2 0.2 0.0 4.1 0.0 0.6 0.0 2.7 Intersection Summary
HCM 7th Control Delay, s/veh 18.7
HCM 7th LOS B
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 20 787 87 136 750 12 115 32 130 38 19 4 Future Volume (veh/h) 20 787 87 136 750 12 115 32 130 38 19 4 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 21 820 91 142 781 12 120 33 135 40 20 4 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 46 1128 487 182 1399 619 154 383 324 78 304 253 Arrive On Green 0.03 0.31 0.31 0.10 0.39 0.39 0.09 0.20 0.20 0.04 0.16 0.16 Sat Flow, veh/h 1810 3610 1559 1810 3610 1598 1810 1900 1605 1810 1900 1583 Grp Volume(v), veh/h 21 820 91 142 781 12 120 33 135 40 20 4 Grp Sat Flow(s),veh/h/ln 1810 1805 1559 1810 1805 1598 1810 1900 1605 1810 1900 1583 Q Serve(g_s), s 0.5 9.4 2.0 3.6 7.9 0.2 3.0 0.7 3.4 1.0 0.4 0.1 Cycle Q Clear(g_c), s 0.5 9.4 2.0 3.6 7.9 0.2 3.0 0.7 3.4 1.0 0.4 0.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 46 1128 487 182 1399 619 154 383 324 78 304 253 V/C Ratio(X) 0.45 0.73 0.19 0.78 0.56 0.02 0.78 0.09 0.42 0.51 0.07 0.02 Avail Cap(c_a), veh/h 193 1467 633 193 1467 649 193 1016 858 193 1016 846 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.5 14.3 11.7 20.5 11.2 8.8 21.0 15.2 16.3 21.9 16.7 16.5 Incr Delay (d2), s/veh 6.8 1.3 0.2 17.5 0.4 0.0 14.6 0.1 0.9 5.1 0.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.9 0.5 2.1 2.2 0.1 1.7 0.2 1.0 0.5 0.2 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.3 15.6 11.9 38.0 11.6 8.9 35.5 15.3 17.1 26.9 16.8 16.6 LnGrp LOS C B B D B A D B B C B B
Approach Vol, veh/h 932 935 288 64
Approach Delay, s/veh 15.5 15.6 24.6 23.1
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.0 13.4 8.7 18.6 8.0 11.5 5.2 22.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 25.0 5.0 19.0 5.0 25.0 5.0 19.0 Max Q Clear Time (g_c+I1), s 3.0 5.4 5.6 11.4 5.0 2.4 2.5 9.9 Green Ext Time (p_c), s 0.0 0.5 0.0 2.8 0.0 0.0 0.0 3.1 Intersection Summary
HCM 7th Control Delay, s/veh 17.0
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 218 2 644 522 533 530 316 1314 16 4 1649 237 Future Volume (veh/h) 218 2 644 522 533 530 316 1314 16 4 1649 237 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 226 0 664 609 450 546 326 1355 16 4 1700 244 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 550 0 488 885 465 787 326 2284 27 9 1787 554 Arrive On Green 0.16 0.00 0.16 0.25 0.25 0.25 0.10 0.45 0.45 0.01 0.36 0.36 Sat Flow, veh/h 3506 0 3114 3506 1841 3116 3401 5119 60 1753 5025 1559 Grp Volume(v), veh/h 226 0 664 609 450 546 326 887 484 4 1700 244 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1830 1753 1675 1559 Q Serve(g_s), s 6.7 0.0 18.0 18.0 27.8 18.2 11.0 22.9 22.9 0.3 37.8 13.7 Cycle Q Clear(g_c), s 6.7 0.0 18.0 18.0 27.8 18.2 11.0 22.9 22.9 0.3 37.8 13.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.03 1.00 1.00
Lane Grp Cap(c), veh/h 550 0 488 885 465 787 326 1495 816 9 1787 554 V/C Ratio(X) 0.41 0.00 1.36 0.69 0.97 0.69 1.00 0.59 0.59 0.44 0.95 0.44 Avail Cap(c_a), veh/h 550 0 488 885 465 787 326 1495 816 76 1794 556 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 43.6 0.0 48.4 38.8 42.5 38.9 51.9 23.9 23.9 57.0 36.0 28.3 Incr Delay (d2), s/veh 0.5 0.0 175.1 2.3 33.5 2.6 50.1 0.6 1.2 29.6 11.7 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.8 0.0 18.6 7.7 16.3 6.9 6.7 8.4 9.2 0.2 16.1 4.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 44.1 0.0 223.6 41.1 76.0 41.5 102.0 24.6 25.1 86.6 47.8 28.8 LnGrp LOS D F D E D F C C F D C
Approach Vol, veh/h 890 1605 1697 1948
Approach Delay, s/veh 178.0 51.0 39.6 45.5
Approach LOS F D D D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.6 55.2 22.0 15.0 44.8 33.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 47.0 18.0 11.0 41.0 29.0 Max Q Clear Time (g_c+I1), s 2.3 24.9 20.0 13.0 39.8 29.8 Green Ext Time (p_c), s 0.0 8.5 0.0 0.0 1.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 64.5
HCM 7th LOS E
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 564 58 62 875 51 41
Future Volume (veh/h) 564 58 62 875 51 41
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 606 62 67 941 55 44
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1151 118 132 2053 129 103
Arrive On Green 0.35 0.35 0.07 0.57 0.14 0.14
Sat Flow, veh/h 3400 338 1810 3705 944 755
Grp Volume(v), veh/h 330 338 67 941 100 0
Grp Sat Flow(s),veh/h/ln 1805 1838 1810 1805 1717 0
Q Serve(g_s), s 4.0 4.0 1.0 4.1 1.4 0.0
Cycle Q Clear(g_c), s 4.0 4.0 1.0 4.1 1.4 0.0
Prop In Lane 0.18 1.00 0.55 0.44
Lane Grp Cap(c), veh/h 629 640 132 2053 234 0
V/C Ratio(X) 0.53 0.53 0.51 0.46 0.43 0.00
Avail Cap(c_a), veh/h 1596 1625 667 5054 886 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 7.1 7.1 12.1 3.4 10.7 0.0
Incr Delay (d2), s/veh 0.7 0.7 3.0 0.2 1.2 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.6 0.3 0.0 0.5 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 7.7 7.7 15.1 3.6 12.0 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 668 1008 100
Approach Delay, s/veh 7.7 4.3 12.0
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 7.7 6.0 13.5 19.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 14.0 10.0 24.0 38.0
Max Q Clear Time (g_c+I1), s 3.4 3.0 6.0 6.1
Green Ext Time (p_c), s 0.2 0.1 3.3 6.7
Intersection Summary
HCM 7th Control Delay, s/veh 6.0
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 174 232 169 160 351 285 224 1356 112 207 1263 144 Future Volume (veh/h) 174 232 169 160 351 285 224 1356 112 207 1263 144 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 181 242 176 167 366 297 233 1412 117 216 1316 150 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 270 943 728 245 918 407 326 1808 553 339 1827 566 Arrive On Green 0.08 0.26 0.26 0.07 0.25 0.25 0.09 0.35 0.35 0.10 0.35 0.35 Sat Flow, veh/h 3510 3610 2785 3510 3610 1603 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 181 242 176 167 366 297 233 1412 117 216 1316 150 Grp Sat Flow(s),veh/h/ln 1755 1805 1392 1755 1805 1603 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 3.6 3.8 3.6 3.3 6.0 12.1 4.6 17.4 3.7 4.2 15.8 4.8 Cycle Q Clear(g_c), s 3.6 3.8 3.6 3.3 6.0 12.1 4.6 17.4 3.7 4.2 15.8 4.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 270 943 728 245 918 407 326 1808 553 339 1827 566 V/C Ratio(X) 0.67 0.26 0.24 0.68 0.40 0.73 0.71 0.78 0.21 0.64 0.72 0.26 Avail Cap(c_a), veh/h 343 1716 1323 245 1615 717 393 2030 621 343 1958 607 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.1 20.9 20.8 32.5 22.1 24.4 31.5 20.9 16.4 31.1 20.1 16.6 Incr Delay (d2), s/veh 3.4 0.1 0.2 7.4 0.3 2.5 4.8 1.8 0.2 3.8 1.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 1.4 1.0 1.5 2.3 4.3 2.0 6.2 1.2 1.8 5.5 1.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.5 21.1 21.0 39.9 22.4 26.9 36.3 22.7 16.6 34.9 21.3 16.8 LnGrp LOS D C C D C C D C B C C B
Approach Vol, veh/h 599 830 1762 1682
Approach Delay, s/veh 25.4 27.6 24.1 22.7
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.9 28.9 9.0 22.7 10.7 29.2 9.5 22.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 28.0 5.0 34.0 8.0 27.0 7.0 32.0 Max Q Clear Time (g_c+I1), s 6.2 19.4 5.3 5.8 6.6 17.8 5.6 14.1 Green Ext Time (p_c), s 0.1 5.5 0.0 2.0 0.1 5.6 0.1 2.9 Intersection Summary
HCM 7th Control Delay, s/veh 24.4
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 485 27 54 668 20 35 3 70 4 4 11 Future Volume (veh/h) 10 485 27 54 668 20 35 3 70 4 4 11 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 11 533 30 59 734 22 38 3 77 4 4 12 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 36 960 413 146 1167 35 259 20 247 52 52 155
Arrive On Green 0.02 0.27 0.27 0.08 0.33 0.33 0.15 0.15 0.15 0.15 0.15 0.15 Sat Flow, veh/h 1810 3610 1554 1810 3575 107 1683 133 1607 339 339 1018 Grp Volume(v), veh/h 11 533 30 59 371 385 41 0 77 20 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1554 1810 1805 1877 1816 0 1607 1697 0 0 Q Serve(g_s), s 0.3 5.9 0.7 1.4 8.0 8.0 0.9 0.0 2.0 0.5 0.0 0.0 Cycle Q Clear(g_c), s 0.3 5.9 0.7 1.4 8.0 8.0 0.9 0.0 2.0 0.5 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.06 0.93 1.00 0.20 0.60
Lane Grp Cap(c), veh/h 36 960 413 146 589 613 279 0 247 258 0 0 V/C Ratio(X) 0.30 0.56 0.07 0.40 0.63 0.63 0.15 0.00 0.31 0.08 0.00 0.00 Avail Cap(c_a), veh/h 275 2196 945 275 1098 1142 868 0 768 258 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 22.2 14.5 12.6 20.1 13.1 13.1 16.9 0.0 17.3 16.7 0.0 0.0 Incr Delay (d2), s/veh 4.7 0.5 0.1 1.8 1.1 1.1 0.2 0.0 0.7 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 1.8 0.2 0.6 2.4 2.5 0.3 0.0 0.6 0.2 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 26.9 15.1 12.7 21.9 14.2 14.2 17.1 0.0 18.0 16.9 0.0 0.0 LnGrp LOS C B B C B B B B B
Approach Vol, veh/h 574 815 118 20
Approach Delay, s/veh 15.2 14.8 17.7 16.9
Approach LOS B B B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.1 7.7 16.2 11.0 4.9 19.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 22.0 7.0 28.0 7.0 7.0 28.0
Max Q Clear Time (g_c+I1), s 4.0 3.4 7.9 2.5 2.3 10.0
Green Ext Time (p_c), s 0.3 0.0 3.1 0.0 0.0 3.8
Intersection Summary
HCM 7th Control Delay, s/veh 15.2
HCM 7th LOS B
h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 24 253 161 229 296 80 159 174 183 46 98 13 Future Volume (veh/h) 24 253 161 229 296 80 159 174 183 46 98 13 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.93 1.00 0.91 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 25 264 168 239 308 83 166 181 191 48 102 14 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 70 556 248 337 762 340 259 863 679 111 713 98 Arrive On Green 0.04 0.15 0.15 0.10 0.21 0.21 0.07 0.45 0.45 0.06 0.44 0.44 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1494 1810 1614 222 Grp Volume(v), veh/h 25 264 168 239 308 83 166 181 191 48 0 116 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1494 1810 0 1836 Q Serve(g_s), s 0.9 4.6 6.7 4.5 5.0 2.9 3.1 3.9 5.5 1.7 0.0 2.6 Cycle Q Clear(g_c), s 0.9 4.6 6.7 4.5 5.0 2.9 3.1 3.9 5.5 1.7 0.0 2.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.12
Lane Grp Cap(c), veh/h 70 556 248 337 762 340 259 863 679 111 0 811 V/C Ratio(X) 0.36 0.48 0.68 0.71 0.40 0.24 0.64 0.21 0.28 0.43 0.00 0.14 Avail Cap(c_a), veh/h 186 1324 590 412 1377 614 412 947 745 186 0 889 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 31.9 26.3 27.2 29.9 23.2 22.4 30.7 11.2 11.6 30.9 0.0 11.3 Incr Delay (d2), s/veh 3.0 0.6 3.2 4.3 0.3 0.4 2.6 0.1 0.2 2.6 0.0 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 1.8 2.5 1.9 1.9 1.0 1.3 1.4 1.5 0.8 0.0 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.0 27.0 30.5 34.2 23.5 22.7 33.3 11.3 11.9 33.5 0.0 11.4 LnGrp LOS C C C C C C C B B C B
Approach Vol, veh/h 457 630 538 164
Approach Delay, s/veh 28.7 27.5 18.3 17.9
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.2 35.0 10.5 14.5 9.0 34.1 6.6 18.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 34.0 8.0 25.0 8.0 33.0 7.0 26.0 Max Q Clear Time (g_c+I1), s 3.7 7.5 6.5 8.7 5.1 4.6 2.9 7.0 Green Ext Time (p_c), s 0.0 1.6 0.1 1.8 0.1 0.5 0.0 1.8 Intersection Summary
HCM 7th Control Delay, s/veh 24.2
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 42 336 45 49 327 93 38 33 45 113 31 53 Future Volume (veh/h) 42 336 45 49 327 93 38 33 45 113 31 53 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 43 346 46 51 337 96 39 34 46 116 32 55 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 87 749 332 100 774 343 157 403 340 330 497 414 Arrive On Green 0.05 0.21 0.21 0.06 0.21 0.21 0.04 0.21 0.21 0.09 0.26 0.26 Sat Flow, veh/h 1810 3610 1599 1810 3610 1599 3510 1900 1603 3510 1900 1584 Grp Volume(v), veh/h 43 346 46 51 337 96 39 34 46 116 32 55 Grp Sat Flow(s),veh/h/ln 1810 1805 1599 1810 1805 1599 1755 1900 1603 1755 1900 1584 Q Serve(g_s), s 0.9 3.1 0.9 1.0 3.0 1.9 0.4 0.5 0.9 1.1 0.5 1.0 Cycle Q Clear(g_c), s 0.9 3.1 0.9 1.0 3.0 1.9 0.4 0.5 0.9 1.1 0.5 1.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 87 749 332 100 774 343 157 403 340 330 497 414 V/C Ratio(X) 0.49 0.46 0.14 0.51 0.44 0.28 0.25 0.08 0.14 0.35 0.06 0.13 Avail Cap(c_a), veh/h 293 2530 1120 293 2530 1121 473 1844 1556 568 1895 1580 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.2 12.9 12.0 17.0 12.6 12.2 17.1 11.7 11.9 15.7 10.3 10.5 Incr Delay (d2), s/veh 4.2 0.4 0.2 4.0 0.4 0.4 0.8 0.1 0.2 0.6 0.1 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.9 0.2 0.4 0.8 0.5 0.1 0.2 0.2 0.4 0.1 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.5 13.3 12.2 21.1 13.0 12.6 17.9 11.8 12.0 16.4 10.3 10.6 LnGrp LOS C B B C B B B B B B B B
Approach Vol, veh/h 435 484 119 203
Approach Delay, s/veh 14.0 13.8 13.9 13.9
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.5 11.9 6.0 11.7 5.7 13.7 5.8 12.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 36.0 6.0 26.0 5.0 37.0 6.0 26.0 Max Q Clear Time (g_c+I1), s 3.1 2.9 3.0 5.1 2.4 3.0 2.9 5.0 Green Ext Time (p_c), s 0.1 0.3 0.0 2.0 0.0 0.3 0.0 2.1 Intersection Summary
HCM 7th Control Delay, s/veh 13.9
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 40 138 206 96 229 144 445 1287 152 151 1027 64 Future Volume (veh/h) 40 138 206 96 229 144 445 1287 152 151 1027 64 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 41 141 210 98 234 147 454 1313 155 154 1048 65 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 145 669 298 237 1097 335 572 2078 637 272 1635 501 Arrive On Green 0.04 0.19 0.19 0.07 0.21 0.21 0.16 0.40 0.40 0.08 0.32 0.32 Sat Flow, veh/h 3510 3610 1608 3510 5187 1585 3510 5187 1589 3510 5187 1588 Grp Volume(v), veh/h 41 141 210 98 234 147 454 1313 155 154 1048 65 Grp Sat Flow(s),veh/h/ln 1755 1805 1608 1755 1729 1585 1755 1729 1589 1755 1729 1588 Q Serve(g_s), s 0.7 2.0 7.3 1.6 2.2 4.8 7.4 12.1 3.9 2.5 10.3 1.7 Cycle Q Clear(g_c), s 0.7 2.0 7.3 1.6 2.2 4.8 7.4 12.1 3.9 2.5 10.3 1.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 145 669 298 237 1097 335 572 2078 637 272 1635 501 V/C Ratio(X) 0.28 0.21 0.70 0.41 0.21 0.44 0.79 0.63 0.24 0.57 0.64 0.13 Avail Cap(c_a), veh/h 295 2003 892 354 2966 906 649 3053 935 295 2530 775 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.6 20.5 22.7 26.6 19.4 20.4 23.9 14.3 11.8 26.5 17.5 14.5 Incr Delay (d2), s/veh 1.1 0.2 3.0 1.2 0.1 0.9 6.0 0.3 0.2 2.1 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.7 2.6 0.6 0.8 1.6 3.1 3.6 1.1 1.0 3.4 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 28.7 20.7 25.7 27.8 19.5 21.3 29.9 14.6 12.0 28.6 17.9 14.7 LnGrp LOS C C C C B C C B B C B B
Approach Vol, veh/h 392 479 1922 1267
Approach Delay, s/veh 24.2 21.7 18.0 19.0
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.6 27.8 8.0 15.0 13.7 22.7 6.5 16.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 6.0 33.0 11.0 29.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 4.5 14.1 3.6 9.3 9.4 12.3 2.7 6.8 Green Ext Time (p_c), s 0.0 9.3 0.0 1.4 0.3 6.3 0.0 1.8 Intersection Summary
HCM 7th Control Delay, s/veh 19.4
HCM 7th LOS B
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 42 464 143 183 827 43 242 657 173 67 627 83 Future Volume (veh/h) 42 464 143 183 827 43 242 657 173 67 627 83 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 44 488 151 193 871 45 255 692 182 71 660 87 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 151 1074 478 299 1186 61 361 1070 474 202 1303 401 Arrive On Green 0.04 0.30 0.30 0.09 0.34 0.34 0.10 0.30 0.30 0.06 0.25 0.25 Sat Flow, veh/h 3510 3610 1607 3510 3492 180 3510 3610 1599 3510 5187 1597 Grp Volume(v), veh/h 44 488 151 193 450 466 255 692 182 71 660 87 Grp Sat Flow(s),veh/h/ln 1755 1805 1607 1755 1805 1867 1755 1805 1599 1755 1729 1597 Q Serve(g_s), s 0.7 6.7 4.4 3.2 13.3 13.3 4.3 10.1 5.5 1.2 6.6 2.6 Cycle Q Clear(g_c), s 0.7 6.7 4.4 3.2 13.3 13.3 4.3 10.1 5.5 1.2 6.6 2.6 Prop In Lane 1.00 1.00 1.00 0.10 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 151 1074 478 299 613 634 361 1070 474 202 1303 401 V/C Ratio(X) 0.29 0.45 0.32 0.64 0.73 0.73 0.71 0.65 0.38 0.35 0.51 0.22 Avail Cap(c_a), veh/h 289 1663 740 462 921 952 404 1960 868 289 2646 814 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.2 17.3 16.6 26.9 17.7 17.7 26.4 18.6 17.0 27.6 19.5 18.0 Incr Delay (d2), s/veh 1.0 0.3 0.4 2.3 1.7 1.7 4.9 0.7 0.5 1.0 0.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.4 1.5 1.3 5.0 5.1 1.8 3.5 1.8 0.5 2.2 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.2 17.6 16.9 29.2 19.4 19.3 31.2 19.3 17.5 28.6 19.8 18.3 LnGrp LOS C B B C B B C B B C B B
Approach Vol, veh/h 683 1109 1129 818
Approach Delay, s/veh 18.2 21.1 21.7 20.4
Approach LOS B C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.5 22.0 9.2 22.1 10.2 19.3 6.6 24.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 33.0 8.0 28.0 7.0 31.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 3.2 12.1 5.2 8.7 6.3 8.6 2.7 15.3 Green Ext Time (p_c), s 0.0 4.6 0.2 3.4 0.1 4.2 0.0 4.9 Intersection Summary
HCM 7th Control Delay, s/veh 20.6
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 124 505 131 177 709 88 339 911 199 151 751 116 Future Volume (veh/h) 124 505 131 177 709 88 339 911 199 151 751 116 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 129 526 136 184 739 92 353 949 207 157 782 121 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 249 1472 449 279 1515 457 458 1600 496 261 1308 406 Arrive On Green 0.07 0.28 0.28 0.08 0.29 0.29 0.13 0.31 0.31 0.07 0.25 0.25 Sat Flow, veh/h 3510 5187 1583 3510 5187 1563 3510 5187 1609 3510 5187 1608 Grp Volume(v), veh/h 129 526 136 184 739 92 353 949 207 157 782 121 Grp Sat Flow(s),veh/h/ln 1755 1729 1583 1755 1729 1563 1755 1729 1609 1755 1729 1608 Q Serve(g_s), s 2.2 5.1 4.2 3.2 7.4 2.8 6.1 9.8 6.4 2.7 8.4 3.8 Cycle Q Clear(g_c), s 2.2 5.1 4.2 3.2 7.4 2.8 6.1 9.8 6.4 2.7 8.4 3.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 249 1472 449 279 1515 457 458 1600 496 261 1308 406 V/C Ratio(X) 0.52 0.36 0.30 0.66 0.49 0.20 0.77 0.59 0.42 0.60 0.60 0.30 Avail Cap(c_a), veh/h 279 2552 779 279 2552 769 501 2882 894 446 2799 868 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.2 18.0 17.7 28.2 18.4 16.8 26.5 18.4 17.3 28.3 20.7 19.0 Incr Delay (d2), s/veh 1.7 0.1 0.4 5.7 0.2 0.2 6.6 0.4 0.6 2.2 0.4 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 1.8 1.3 1.4 2.5 0.9 2.6 3.2 2.0 1.1 2.8 1.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.9 18.1 18.0 33.8 18.6 17.0 33.1 18.8 17.8 30.5 21.2 19.5 LnGrp LOS C B B C B B C B B C C B
Approach Vol, veh/h 791 1015 1509 1060
Approach Delay, s/veh 20.0 21.3 22.0 22.4
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.7 23.4 9.0 21.9 12.2 19.9 8.5 22.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 35.0 5.0 31.0 9.0 34.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 4.7 11.8 5.2 7.1 8.1 10.4 4.2 9.4 Green Ext Time (p_c), s 0.1 6.8 0.0 3.7 0.1 5.2 0.0 4.8 Intersection Summary
HCM 7th Control Delay, s/veh 21.6
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/21/2025 Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 67 66 192 244 124 78 222 1208 182 24 1025 29 Future Volume (veh/h) 67 66 192 244 124 78 222 1208 182 24 1025 29 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 69 68 198 252 128 80 229 1245 188 25 1057 30 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 99 344 284 299 554 460 275 1740 263 50 1342 415 Arrive On Green 0.05 0.18 0.18 0.17 0.29 0.29 0.15 0.38 0.38 0.03 0.26 0.26 Sat Flow, veh/h 1810 1900 1571 1810 1900 1578 1810 4546 686 1810 5187 1604 Grp Volume(v), veh/h 69 68 198 252 128 80 229 947 486 25 1057 30 Grp Sat Flow(s),veh/h/ln 1810 1900 1571 1810 1900 1578 1810 1729 1774 1810 1729 1604 Q Serve(g_s), s 2.5 2.0 7.8 8.9 3.4 2.5 8.1 15.3 15.3 0.9 12.5 0.9 Cycle Q Clear(g_c), s 2.5 2.0 7.8 8.9 3.4 2.5 8.1 15.3 15.3 0.9 12.5 0.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.39 1.00 1.00
Lane Grp Cap(c), veh/h 99 344 284 299 554 460 275 1323 679 50 1342 415 V/C Ratio(X) 0.70 0.20 0.70 0.84 0.23 0.17 0.83 0.72 0.72 0.50 0.79 0.07 Avail Cap(c_a), veh/h 220 635 525 330 751 624 303 1323 679 138 1498 463 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.6 22.9 25.2 26.6 17.7 17.4 27.1 17.3 17.3 31.5 22.7 18.4 Incr Delay (d2), s/veh 8.7 0.3 3.1 16.5 0.2 0.2 16.6 1.9 3.6 7.3 2.6 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 0.8 2.8 4.8 1.3 0.8 4.3 5.1 5.6 0.5 4.6 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 39.2 23.2 28.3 43.2 17.9 17.6 43.7 19.1 20.9 38.9 25.3 18.5 LnGrp LOS D C C D B B D B C D C B
Approach Vol, veh/h 335 460 1662 1112
Approach Delay, s/veh 29.5 31.7 23.0 25.4
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 5.8 29.2 14.9 15.9 14.0 21.0 7.6 23.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 25.0 12.0 22.0 11.0 19.0 8.0 26.0 Max Q Clear Time (g_c+I1), s 2.9 17.3 10.9 9.8 10.1 14.5 4.5 5.4 Green Ext Time (p_c), s 0.0 4.7 0.1 0.7 0.1 2.5 0.0 0.8 Intersection Summary
HCM 7th Control Delay, s/veh 25.5
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 47 20 81 127 34 101 81 1462 91 80 1375 41 Future Volume (veh/h) 47 20 81 127 34 101 81 1462 91 80 1375 41 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 48 21 84 131 35 104 84 1507 94 82 1418 42 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 89 48 192 304 345 289 128 1876 580 126 1871 566 Arrive On Green 0.05 0.14 0.14 0.09 0.18 0.18 0.07 0.36 0.36 0.07 0.36 0.36 Sat Flow, veh/h 1810 332 1329 3510 1900 1589 1810 5187 1603 1810 5187 1570 Grp Volume(v), veh/h 48 0 105 131 35 104 84 1507 94 82 1418 42 Grp Sat Flow(s),veh/h/ln 1810 0 1661 1755 1900 1589 1810 1729 1603 1810 1729 1570 Q Serve(g_s), s 1.2 0.0 2.7 1.7 0.7 2.7 2.1 12.4 1.9 2.1 11.4 0.8 Cycle Q Clear(g_c), s 1.2 0.0 2.7 1.7 0.7 2.7 2.1 12.4 1.9 2.1 11.4 0.8 Prop In Lane 1.00 0.80 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 89 0 240 304 345 289 128 1876 580 126 1871 566 V/C Ratio(X) 0.54 0.00 0.44 0.43 0.10 0.36 0.66 0.80 0.16 0.65 0.76 0.07 Avail Cap(c_a), veh/h 191 0 911 370 1042 872 191 1970 609 191 1970 596 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.0 0.0 18.5 20.5 16.2 17.0 21.5 13.6 10.3 21.5 13.3 10.0 Incr Delay (d2), s/veh 4.9 0.0 1.3 1.0 0.1 0.8 5.6 2.4 0.1 5.6 1.7 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 0.9 0.6 0.3 0.9 0.9 3.5 0.5 0.9 3.2 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 26.9 0.0 19.8 21.5 16.3 17.7 27.1 16.0 10.4 27.0 15.0 10.0 LnGrp LOS C B C B B C B B C B B
Approach Vol, veh/h 153 270 1685 1542
Approach Delay, s/veh 22.0 19.4 16.3 15.5
Approach LOS C B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.3 21.1 8.1 10.9 7.3 21.1 6.3 12.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 18.0 5.0 26.0 5.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 4.1 14.4 3.7 4.7 4.1 13.4 3.2 4.7 Green Ext Time (p_c), s 0.0 2.7 0.0 0.5 0.0 3.2 0.0 0.4 Intersection Summary
HCM 7th Control Delay, s/veh 16.4
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 258 0 154 0 0 0 296 1463 0 0 1346 254 Future Volume (veh/h) 258 0 154 0 0 0 296 1463 0 0 1346 254 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 263 0 157 0 0 0 302 1493 0 0 1373 259 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 887 0 265 0 313 0 365 3441 0 0 1948 605
Arrive On Green 0.16 0.00 0.16 0.00 0.00 0.00 0.20 0.66 0.00 0.00 0.38 0.38 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 263 0 157 0 0 0 302 1493 0 0 1373 259 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 3.1 0.0 4.2 0.0 0.0 0.0 7.4 6.3 0.0 0.0 10.5 5.6 Cycle Q Clear(g_c), s 3.1 0.0 4.2 0.0 0.0 0.0 7.4 6.3 0.0 0.0 10.5 5.6 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 887 0 265 0 313 0 365 3441 0 0 1948 605 V/C Ratio(X) 0.30 0.00 0.59 0.00 0.00 0.00 0.83 0.43 0.00 0.00 0.70 0.43 Avail Cap(c_a), veh/h 1970 0 762 0 899 0 428 3903 0 0 2230 692 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 17.5 0.0 18.0 0.0 0.0 0.0 17.8 3.7 0.0 0.0 12.3 10.8 Incr Delay (d2), s/veh 0.2 0.0 2.1 0.0 0.0 0.0 11.1 0.1 0.0 0.0 0.9 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.0 1.4 0.0 0.0 0.0 3.4 0.3 0.0 0.0 2.7 1.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.7 0.0 20.1 0.0 0.0 0.0 28.9 3.8 0.0 0.0 13.2 11.3 LnGrp LOS B C C A B B
Approach Vol, veh/h 420 0 1795 1632
Approach Delay, s/veh 18.6 0.0 8.0 12.9
Approach LOS B A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 34.9 11.7 13.4 21.5 11.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 35.0 22.0 11.0 20.0 22.0
Max Q Clear Time (g_c+I1), s 8.3 6.2 9.4 12.5 0.0
Green Ext Time (p_c), s 11.0 1.5 0.1 5.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 11.2
HCM 7th LOS B
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Jet Way 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 89 74 1863 107 14 1801
Future Volume (veh/h) 89 74 1863 107 14 1801
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 96 80 2003 115 15 1937
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 182 162 2994 930 48 3604
Arrive On Green 0.10 0.10 0.58 0.58 0.03 0.69
Sat Flow, veh/h 1810 1610 5358 1610 1810 5358
Grp Volume(v), veh/h 96 80 2003 115 15 1937
Grp Sat Flow(s),veh/h/ln 1810 1610 1729 1610 1810 1729
Q Serve(g_s), s 2.2 2.1 11.7 1.4 0.4 8.0
Cycle Q Clear(g_c), s 2.2 2.1 11.7 1.4 0.4 8.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 182 162 2994 930 48 3604
V/C Ratio(X) 0.53 0.49 0.67 0.12 0.31 0.54
Avail Cap(c_a), veh/h 1029 915 3539 1098 288 4836
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 18.8 18.7 6.4 4.2 21.0 3.3
Incr Delay (d2), s/veh 2.4 2.3 0.4 0.1 3.6 0.1
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.9 0.8 1.3 0.3 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.2 21.1 6.8 4.3 24.6 3.4
LnGrp LOS C C A A C A
Approach Vol, veh/h 176 2118 1952
Approach Delay, s/veh 21.1 6.7 3.6
Approach LOS C A A
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 5.2 29.4 34.6 9.4
Change Period (Y+Rc), s 4.0 4.0 4.0 5.0
Max Green Setting (Gmax), s 7.0 30.0 41.0 25.0
Max Q Clear Time (g_c+I1), s 2.4 13.7 10.0 4.2
Green Ext Time (p_c), s 0.0 11.7 16.7 0.5
Intersection Summary
HCM 7th Control Delay, s/veh 5.8
HCM 7th LOS A
h 7 1 7 " 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 261 168 0 1884 1784 663
Future Volume (veh/h) 261 168 0 1884 1784 663
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 290 146 0 1922 1820 0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 602 268 0 3331 3331
Arrive On Green 0.17 0.17 0.00 0.64 0.64 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 290 146 0 1922 1820 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 3.0 3.5 0.0 8.8 8.1 0.0
Cycle Q Clear(g_c), s 3.0 3.5 0.0 8.8 8.1 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 602 268 0 3331 3331
V/C Ratio(X) 0.48 0.54 0.00 0.58 0.55
Avail Cap(c_a), veh/h 1039 462 0 4965 4965
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 15.8 16.0 0.0 4.3 4.1 0.0
Incr Delay (d2), s/veh 0.6 1.7 0.0 0.2 0.1 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.1 1.2 0.0 0.2 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 16.4 17.7 0.0 4.4 4.3 0.0
LnGrp LOS B B A A
Approach Vol, veh/h 436 1922 1820
Approach Delay, s/veh 16.8 4.4 4.3
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 30.8 11.0 30.8
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 40.0 12.0 40.0
Max Q Clear Time (g_c+I1), s 10.8 5.5 10.1
Green Ext Time (p_c), s 16.0 0.9 15.1
Intersection Summary
HCM 7th Control Delay, s/veh 5.6
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 907 0 254 0 1633 397 214 1715 0 Future Volume (veh/h) 0 0 0 907 0 254 0 1633 397 214 1715 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 945 0 265 0 1701 414 223 1786 0 Peak Hour Factor 0.95 0.95 0.95 0.96 0.95 0.96 0.95 0.96 0.96 0.96 0.96 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 3 0 1111 0 989 0 2153 1154 287 2916 0
Arrive On Green 0.00 0.00 0.00 0.31 0.00 0.31 0.00 0.42 0.42 0.08 0.56 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 945 0 265 0 1701 414 223 1786 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 15.0 0.0 3.8 0.0 17.5 6.0 3.8 14.1 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 15.0 0.0 3.8 0.0 17.5 6.0 3.8 14.1 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 3 0 1111 0 989 0 2153 1154 287 2916 0 V/C Ratio(X) 0.00 0.00 0.00 0.85 0.00 0.27 0.00 0.79 0.36 0.78 0.61 0.00 Avail Cap(c_a), veh/h 0 153 0 1301 0 1632 0 2289 1196 287 3052 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 19.9 0.0 16.0 0.0 15.6 3.2 27.5 8.9 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 4.9 0.0 0.1 0.0 1.8 0.2 12.6 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 6.0 0.0 1.2 0.0 5.4 0.7 1.9 3.2 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 24.8 0.0 16.1 0.0 17.4 3.4 40.2 9.3 0.0 LnGrp LOS C B B A D A
Approach Vol, veh/h 0 1210 2115 2009
Approach Delay, s/veh 0.0 22.9 14.7 12.7
Approach LOS C B B
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 9.0 29.4 22.8 0.0 38.4 22.8
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 27.0 22.0 5.0 36.0 31.0 Max Q Clear Time (g_c+I1), s 5.8 19.5 17.0 0.0 16.1 5.8 Green Ext Time (p_c), s 0.0 5.9 1.8 0.0 11.7 1.0
Intersection Summary
HCM 7th Control Delay, s/veh 15.8
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/21/2025 Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 309 531 155 306 672 370 159 1153 215 309 1743 301 Future Volume (veh/h) 309 531 155 306 672 370 159 1153 215 309 1743 301 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 329 565 165 326 715 394 169 1227 229 329 1854 320 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 351 1438 441 403 1514 464 244 1472 275 396 1964 610 Arrive On Green 0.10 0.28 0.28 0.11 0.29 0.29 0.07 0.34 0.34 0.11 0.38 0.38 Sat Flow, veh/h 3510 5187 1590 3510 5187 1588 3510 4391 820 3510 5187 1610 Grp Volume(v), veh/h 329 565 165 326 715 394 169 966 490 329 1854 320 Grp Sat Flow(s),veh/h/ln 1755 1729 1590 1755 1729 1588 1755 1729 1752 1755 1729 1610 Q Serve(g_s), s 9.3 8.8 8.4 9.1 11.3 23.4 4.7 25.8 25.8 9.2 34.6 15.4 Cycle Q Clear(g_c), s 9.3 8.8 8.4 9.1 11.3 23.4 4.7 25.8 25.8 9.2 34.6 15.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.47 1.00 1.00
Lane Grp Cap(c), veh/h 351 1438 441 403 1514 464 244 1159 587 396 1964 610 V/C Ratio(X) 0.94 0.39 0.37 0.81 0.47 0.85 0.69 0.83 0.83 0.83 0.94 0.52 Avail Cap(c_a), veh/h 351 1505 461 527 1764 540 246 1159 587 421 1972 612 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 44.7 29.3 29.1 43.2 29.1 33.3 45.5 30.7 30.7 43.4 30.0 24.1 Incr Delay (d2), s/veh 32.2 0.2 0.5 7.0 0.2 10.9 8.1 5.4 10.0 12.6 10.0 0.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.5 3.5 3.1 4.2 4.5 9.8 2.2 10.6 11.5 4.4 14.6 5.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 76.9 29.5 29.7 50.2 29.3 44.2 53.6 36.0 40.7 56.0 40.1 24.9 LnGrp LOS E C C D C D D D D E D C
Approach Vol, veh/h 1059 1435 1625 2503
Approach Delay, s/veh 44.2 38.1 39.3 40.2
Approach LOS D D D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 15.3 37.5 15.5 31.7 10.9 41.8 14.0 33.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 12.0 33.0 15.0 29.0 7.0 38.0 10.0 34.0 Max Q Clear Time (g_c+I1), s 11.2 27.8 11.1 10.8 6.7 36.6 11.3 25.4 Green Ext Time (p_c), s 0.1 3.5 0.4 3.8 0.0 1.3 0.0 3.8 Intersection Summary
HCM 7th Control Delay, s/veh 40.2
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 143 0 154 0 0 0 206 1138 0 0 1023 145 Future Volume (veh/h) 143 0 154 0 0 0 206 1138 0 0 1023 145 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 151 0 162 0 0 0 217 1198 0 0 1077 153 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 533 0 0 0 5 0 433 3244 0 0 2026 621
Arrive On Green 0.15 0.00 0.00 0.00 0.00 0.00 0.12 0.63 0.00 0.00 0.39 0.39 Sat Flow, veh/h 3510 151 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 151 13.8 0 0 0 217 1198 0 0 1077 153 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 1.4 0.0 0.0 0.0 2.1 4.0 0.0 0.0 5.7 2.3 Cycle Q Clear(g_c), s 1.4 0.0 0.0 0.0 2.1 4.0 0.0 0.0 5.7 2.3 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 533 0 5 0 433 3244 0 0 2026 621
V/C Ratio(X) 0.28 0.00 0.00 0.00 0.50 0.37 0.00 0.00 0.53 0.25 Avail Cap(c_a), veh/h 2739 0 1535 0 489 4480 0 0 3180 974 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 13.5 0.0 0.0 0.0 14.7 3.3 0.0 0.0 8.4 7.4 Incr Delay (d2), s/veh 0.3 0.0 0.0 0.0 0.9 0.1 0.0 0.0 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 0.0 0.0 0.6 0.0 0.0 0.0 1.1 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.8 0.0 0.0 0.0 15.6 3.3 0.0 0.0 8.6 7.6 LnGrp LOS B B A A A
Approach Vol, veh/h 0 1415 1230
Approach Delay, s/veh 0.0 5.2 8.5
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 26.4 8.4 18.0 9.4 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 6.0 4.1 7.7 3.4 0.0
Green Ext Time (p_c), s 8.4 0.1 6.2 0.4 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.1
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 153 527 177 240 836 301 195 911 215 222 806 109 Future Volume (veh/h) 153 527 177 240 836 301 195 911 215 222 806 109 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 156 538 181 245 853 307 199 930 219 227 822 111 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 238 1505 457 284 1572 478 291 1453 444 468 1715 525 Arrive On Green 0.07 0.29 0.29 0.08 0.30 0.30 0.08 0.28 0.28 0.13 0.33 0.33 Sat Flow, veh/h 3510 5187 1576 3510 5187 1578 3510 5187 1586 3510 5187 1587 Grp Volume(v), veh/h 156 538 181 245 853 307 199 930 219 227 822 111 Grp Sat Flow(s),veh/h/ln 1755 1729 1576 1755 1729 1578 1755 1729 1586 1755 1729 1587 Q Serve(g_s), s 3.2 6.1 6.8 5.1 10.2 12.5 4.1 11.7 8.6 4.4 9.4 3.7 Cycle Q Clear(g_c), s 3.2 6.1 6.8 5.1 10.2 12.5 4.1 11.7 8.6 4.4 9.4 3.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 238 1505 457 284 1572 478 291 1453 444 468 1715 525 V/C Ratio(X) 0.65 0.36 0.40 0.86 0.54 0.64 0.68 0.64 0.49 0.48 0.48 0.21 Avail Cap(c_a), veh/h 284 2375 722 284 2375 722 425 2375 726 473 2445 748 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.8 20.9 21.1 33.7 21.6 22.4 33.1 23.4 22.3 29.8 19.8 17.9 Incr Delay (d2), s/veh 4.1 0.1 0.6 23.0 0.3 1.4 2.8 0.5 0.8 0.8 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 2.2 2.3 2.9 3.7 4.3 1.7 4.2 3.0 1.8 3.3 1.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 37.9 21.0 21.7 56.8 21.9 23.8 36.0 23.9 23.2 30.6 20.0 18.1 LnGrp LOS D C C E C C D C C C B B
Approach Vol, veh/h 875 1405 1348 1160
Approach Delay, s/veh 24.2 28.4 25.6 21.9
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.9 24.8 10.0 25.6 10.2 28.6 9.0 26.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 34.0 6.0 34.0 9.0 35.0 6.0 34.0 Max Q Clear Time (g_c+I1), s 6.4 13.7 7.1 8.8 6.1 11.4 5.2 14.5 Green Ext Time (p_c), s 0.2 6.6 0.0 4.0 0.2 5.6 0.0 6.5 Intersection Summary
HCM 7th Control Delay, s/veh 25.2
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/21/2025
Year 2028 Cumulative Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 38 77 200 83 123 49 174 1277 84 30 1119 62 Future Volume (veh/h) 38 77 200 83 123 49 174 1277 84 30 1119 62 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 40 80 208 86 128 51 181 1330 88 31 1166 65 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 73 330 280 113 372 311 225 2272 690 60 1799 546 Arrive On Green 0.04 0.17 0.17 0.06 0.20 0.20 0.12 0.44 0.44 0.03 0.35 0.35 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 40 80 208 86 128 51 181 1330 88 31 1166 65 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 1.3 2.2 7.5 2.9 3.6 1.6 6.0 11.9 2.0 1.0 11.7 1.7 Cycle Q Clear(g_c), s 1.3 2.2 7.5 2.9 3.6 1.6 6.0 11.9 2.0 1.0 11.7 1.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 73 330 280 113 372 311 225 2272 690 60 1799 546 V/C Ratio(X) 0.55 0.24 0.74 0.76 0.34 0.16 0.80 0.59 0.13 0.51 0.65 0.12 Avail Cap(c_a), veh/h 176 1203 1020 147 1172 979 264 3116 946 176 2863 869 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.0 22.0 24.1 28.4 21.3 20.6 26.2 13.1 10.3 29.3 16.9 13.7 Incr Delay (d2), s/veh 6.3 0.4 3.9 15.4 0.5 0.2 14.2 0.2 0.1 6.6 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 1.0 3.0 1.7 1.5 0.6 3.1 3.5 0.6 0.5 3.8 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.3 22.3 28.0 43.8 21.9 20.8 40.4 13.3 10.4 35.8 17.3 13.8 LnGrp LOS D C C D C C D B B D B B
Approach Vol, veh/h 328 265 1599 1262
Approach Delay, s/veh 27.5 28.8 16.2 17.6
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.1 31.0 7.9 16.7 11.7 25.4 6.5 18.1 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 37.0 5.0 39.0 9.0 34.0 6.0 38.0 Max Q Clear Time (g_c+I1), s 3.0 13.9 4.9 9.5 8.0 13.7 3.3 5.6 Green Ext Time (p_c), s 0.0 9.6 0.0 1.2 0.0 7.7 0.0 0.9 Intersection Summary
HCM 7th Control Delay, s/veh 18.8
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
Appendix F. Year 2028 With Project Phases I-II
Peak Hour Analysis Worksheets
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 36 1156 32 2 830 38 9 4 0 33 12 34 Future Volume (veh/h) 36 1156 32 2 830 38 9 4 0 33 12 34 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 38 1217 34 2 874 40 9 4 0 35 13 36 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.96 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 81 2102 59 6 1845 84 391 141 0 253 110 153
Arrive On Green 0.04 0.41 0.41 0.00 0.36 0.36 0.22 0.22 0.00 0.22 0.22 0.22 Sat Flow, veh/h 1810 5187 145 1810 5078 232 924 648 0 431 502 700 Grp Volume(v), veh/h 38 811 440 2 595 319 13 0 0 84 0 0 Grp Sat Flow(s),veh/h/ln 1810 1729 1873 1810 1729 1851 1572 0 0 1634 0 0 Q Serve(g_s), s 0.7 5.9 5.9 0.0 4.2 4.3 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.7 5.9 5.9 0.0 4.2 4.3 0.2 0.0 0.0 1.3 0.0 0.0 Prop In Lane 1.00 0.08 1.00 0.13 0.69 0.00 0.42 0.43
Lane Grp Cap(c), veh/h 81 1402 759 6 1256 673 533 0 0 515 0 0 V/C Ratio(X) 0.47 0.58 0.58 0.35 0.47 0.47 0.02 0.00 0.00 0.16 0.00 0.00 Avail Cap(c_a), veh/h 282 1939 1051 282 1939 1038 1377 0 0 1394 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 15.0 7.4 7.4 16.0 7.9 7.9 9.9 0.0 0.0 10.3 0.0 0.0 Incr Delay (d2), s/veh 4.2 0.4 0.7 34.0 0.3 0.5 0.0 0.0 0.0 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.9 1.0 0.1 0.7 0.8 0.1 0.0 0.0 0.4 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 19.1 7.8 8.1 49.9 8.1 8.4 9.9 0.0 0.0 10.4 0.0 0.0 LnGrp LOS B A A D A A A B
Approach Vol, veh/h 1289 916 13 84
Approach Delay, s/veh 8.2 8.3 9.9 10.4
Approach LOS A A A B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.1 17.0 11.0 5.4 15.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.2 2.0 7.9 3.3 2.7 6.3
Green Ext Time (p_c), s 0.0 0.0 5.2 0.4 0.0 4.1
Intersection Summary
HCM 7th Control Delay, s/veh 8.4
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 246 737 402 140 660 152 290 1303 259 188 1188 165 Future Volume (veh/h) 246 737 402 140 660 152 290 1303 259 188 1188 165 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 286 857 467 163 767 177 337 1515 301 219 1381 192 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 322 1634 501 222 1486 574 355 1758 647 258 1615 649 Arrive On Green 0.10 0.34 0.34 0.07 0.31 0.31 0.11 0.36 0.36 0.08 0.33 0.33 Sat Flow, veh/h 3291 4863 1491 3291 4863 1490 3291 4863 1508 3291 4863 1508 Grp Volume(v), veh/h 286 857 467 163 767 177 337 1515 301 219 1381 192 Grp Sat Flow(s),veh/h/ln 1646 1621 1491 1646 1621 1490 1646 1621 1508 1646 1621 1508 Q Serve(g_s), s 8.8 14.5 30.9 5.0 13.3 8.5 10.4 29.5 14.5 6.7 27.0 8.5 Cycle Q Clear(g_c), s 8.8 14.5 30.9 5.0 13.3 8.5 10.4 29.5 14.5 6.7 27.0 8.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 322 1634 501 222 1486 574 355 1758 647 258 1615 649 V/C Ratio(X) 0.89 0.52 0.93 0.73 0.52 0.31 0.95 0.86 0.47 0.85 0.86 0.30 Avail Cap(c_a), veh/h 322 1667 511 226 1524 585 355 1858 678 258 1715 680 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 45.5 27.3 32.8 46.7 29.2 22.0 45.3 30.2 20.8 46.5 31.8 19.0 Incr Delay (d2), s/veh 24.4 0.3 24.0 11.5 0.3 0.3 34.9 4.2 0.5 22.5 4.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.5 5.2 13.6 2.3 4.9 2.8 5.7 11.0 4.8 3.4 10.2 2.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 69.9 27.6 56.8 58.2 29.5 22.3 80.2 34.5 21.3 69.0 36.1 19.3 LnGrp LOS E C E E C C F C C E D B
Approach Vol, veh/h 1610 1107 2153 1792
Approach Delay, s/veh 43.6 32.6 39.8 38.3
Approach LOS D C D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 12.0 40.9 10.9 38.3 15.0 37.9 14.0 35.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 39.0 7.0 35.0 11.0 36.0 10.0 32.0 Max Q Clear Time (g_c+I1), s 8.7 31.5 7.0 32.9 12.4 29.0 10.8 15.3 Green Ext Time (p_c), s 0.0 5.4 0.0 1.4 0.0 4.6 0.0 4.9 Intersection Summary
HCM 7th Control Delay, s/veh 39.1
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Project Dwy D/NW Promenade & Rosedale Highway 12/27/2025 Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 67 1335 72 87 808 61 99 6 38 86 7 50 Future Volume (veh/h) 67 1335 72 87 808 61 99 6 38 86 7 50 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1870 1870 1900 1900 1870 1870 1870 1900 1870 1900 Adj Flow Rate, veh/h 74 1467 76 92 888 67 104 6 40 100 0 55 Peak Hour Factor 0.91 0.91 0.95 0.95 0.91 0.91 0.95 0.95 0.95 0.91 0.95 0.91 Percent Heavy Veh, % 0 0 2 2 0 0 2 2 2 0 2 0
Cap, veh/h 217 1956 597 123 1993 618 156 9 60 467 0 208 Arrive On Green 0.06 0.38 0.38 0.07 0.38 0.38 0.13 0.13 0.13 0.13 0.00 0.13 Sat Flow, veh/h 3510 5187 1583 1781 5187 1609 1198 69 461 3619 0 1610 Grp Volume(v), veh/h 74 1467 76 92 888 67 150 0 0 100 0 55 Grp Sat Flow(s),veh/h/ln 1755 1729 1583 1781 1729 1609 1728 0 0 1810 0 1610 Q Serve(g_s), s 1.1 13.3 1.7 2.8 6.9 1.5 4.5 0.0 0.0 1.3 0.0 1.7 Cycle Q Clear(g_c), s 1.1 13.3 1.7 2.8 6.9 1.5 4.5 0.0 0.0 1.3 0.0 1.7 Prop In Lane 1.00 1.00 1.00 1.00 0.69 0.27 1.00 1.00
Lane Grp Cap(c), veh/h 217 1956 597 123 1993 618 224 0 0 467 0 208 V/C Ratio(X) 0.34 0.75 0.13 0.75 0.45 0.11 0.67 0.00 0.00 0.21 0.00 0.26 Avail Cap(c_a), veh/h 323 2199 671 164 2199 682 573 0 0 1201 0 534 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 24.4 14.7 11.1 24.8 12.4 10.7 22.5 0.0 0.0 21.2 0.0 21.3 Incr Delay (d2), s/veh 0.9 1.3 0.1 12.1 0.2 0.1 3.4 0.0 0.0 0.2 0.0 0.7 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 4.0 0.5 1.4 2.0 0.4 1.9 0.0 0.0 0.5 0.0 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 25.3 16.0 11.2 36.9 12.6 10.8 25.9 0.0 0.0 21.4 0.0 22.0 LnGrp LOS C B B D B B C C C
Approach Vol, veh/h 1617 1047 150 155
Approach Delay, s/veh 16.2 14.6 25.9 21.6
Approach LOS B B C C
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 7.8 24.5 11.0 7.4 24.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 18.0 5.0 23.0 18.0 5.0 23.0 Max Q Clear Time (g_c+I1), s 6.5 4.8 15.3 3.7 3.1 8.9
Green Ext Time (p_c), s 0.6 0.0 5.1 0.4 0.0 4.9
Intersection Summary
HCM 7th Control Delay, s/veh 16.4
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. " +++ 7 h 1 7 4 h 4 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 120 1217 99 14 809 89 85 43 50 223 48 112 Future Volume (veh/h) 120 1217 99 14 809 89 85 43 50 223 48 112 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 135 1367 111 16 909 100 96 48 56 251 54 126 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 296 2129 661 36 1794 557 258 502 223 395 643 281 Arrive On Green 0.08 0.41 0.41 0.02 0.35 0.35 0.07 0.14 0.14 0.11 0.18 0.18 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1600 3510 3610 1579 Grp Volume(v), veh/h 135 1367 111 16 909 100 96 48 56 251 54 126 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1600 1755 1805 1579 Q Serve(g_s), s 1.8 10.6 2.2 0.4 7.0 2.2 1.3 0.6 1.6 3.4 0.6 3.6 Cycle Q Clear(g_c), s 1.8 10.6 2.2 0.4 7.0 2.2 1.3 0.6 1.6 3.4 0.6 3.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 296 2129 661 36 1794 557 258 502 223 395 643 281 V/C Ratio(X) 0.46 0.64 0.17 0.44 0.51 0.18 0.37 0.10 0.25 0.64 0.08 0.45 Avail Cap(c_a), veh/h 489 2888 896 180 2681 832 349 2153 954 768 2584 1130 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.9 11.9 9.4 24.4 13.0 11.5 22.2 18.9 19.3 21.3 17.2 18.5 Incr Delay (d2), s/veh 1.1 0.3 0.1 8.3 0.2 0.2 0.9 0.1 0.6 1.7 0.1 1.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 2.8 0.5 0.2 2.0 0.6 0.5 0.2 0.5 1.3 0.2 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 23.0 12.2 9.5 32.7 13.3 11.6 23.1 19.0 19.9 23.0 17.3 19.6 LnGrp LOS C B A C B B C B B C B B
Approach Vol, veh/h 1613 1025 200 431
Approach Delay, s/veh 12.9 13.4 21.2 21.3
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.7 11.0 5.0 24.6 7.7 13.0 8.2 21.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 30.0 5.0 28.0 5.0 36.0 7.0 26.0 Max Q Clear Time (g_c+I1), s 5.4 3.6 2.4 12.6 3.3 5.6 3.8 9.0 Green Ext Time (p_c), s 0.4 0.4 0.0 8.0 0.0 0.7 0.1 5.5 Intersection Summary
HCM 7th Control Delay, s/veh 14.7
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 126 535 162 331 783 133 244 670 251 123 949 253 Future Volume (veh/h) 126 535 162 331 783 133 244 670 251 123 949 253 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 138 588 178 364 860 146 268 736 276 135 1043 278 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 211 1038 321 382 1290 400 297 1988 617 209 1293 569 Arrive On Green 0.06 0.21 0.21 0.12 0.26 0.26 0.09 0.41 0.41 0.06 0.38 0.38 Sat Flow, veh/h 3319 4904 1518 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 138 588 178 364 860 146 268 736 276 135 1043 278 Grp Sat Flow(s),veh/h/ln 1659 1635 1518 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 3.2 8.4 8.2 8.5 12.2 6.1 6.2 8.2 10.3 3.1 21.4 11.0 Cycle Q Clear(g_c), s 3.2 8.4 8.2 8.5 12.2 6.1 6.2 8.2 10.3 3.1 21.4 11.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 211 1038 321 382 1290 400 297 1988 617 209 1293 569 V/C Ratio(X) 0.65 0.57 0.55 0.95 0.67 0.37 0.90 0.37 0.45 0.65 0.81 0.49 Avail Cap(c_a), veh/h 297 2009 622 382 2134 661 297 2197 682 340 1573 692 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.7 27.6 27.5 34.3 25.7 23.5 35.2 16.2 16.9 35.8 21.7 18.5 Incr Delay (d2), s/veh 3.4 0.5 1.5 33.7 0.6 0.6 28.4 0.1 0.5 3.3 2.7 0.7 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 3.0 2.8 4.9 4.3 2.0 3.5 2.7 3.2 1.3 7.8 3.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 39.1 28.1 29.0 68.1 26.3 24.0 63.7 16.4 17.4 39.1 24.4 19.2 LnGrp LOS D C C E C C E B B D C B
Approach Vol, veh/h 904 1370 1280 1456
Approach Delay, s/veh 29.9 37.2 26.5 24.7
Approach LOS C D C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.9 35.7 13.0 20.5 11.0 33.6 9.0 24.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 35.0 9.0 32.0 7.0 36.0 7.0 34.0 Max Q Clear Time (g_c+I1), s 5.1 10.2 10.5 10.4 8.2 23.4 5.2 14.2 Green Ext Time (p_c), s 0.1 3.3 0.0 4.1 0.0 6.1 0.1 5.8 Intersection Summary
HCM 7th Control Delay, s/veh 29.5
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 80 717 20 29 537 102 52 28 42 354 77 99 Future Volume (veh/h) 80 717 20 29 537 102 52 28 42 354 77 99 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 85 763 21 31 571 109 55 30 45 377 82 105 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 123 1357 418 63 824 364 95 285 240 443 650 549 Arrive On Green 0.07 0.26 0.26 0.03 0.23 0.23 0.05 0.15 0.15 0.24 0.34 0.34 Sat Flow, veh/h 1810 5187 1598 1810 3610 1596 1810 1900 1601 1810 1900 1606 Grp Volume(v), veh/h 85 763 21 31 571 109 55 30 45 377 82 105 Grp Sat Flow(s),veh/h/ln 1810 1729 1598 1810 1805 1596 1810 1900 1601 1810 1900 1606 Q Serve(g_s), s 2.4 6.6 0.5 0.9 7.5 2.9 1.5 0.7 1.3 10.3 1.5 2.4 Cycle Q Clear(g_c), s 2.4 6.6 0.5 0.9 7.5 2.9 1.5 0.7 1.3 10.3 1.5 2.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 123 1357 418 63 824 364 95 285 240 443 650 549 V/C Ratio(X) 0.69 0.56 0.05 0.49 0.69 0.30 0.58 0.11 0.19 0.85 0.13 0.19 Avail Cap(c_a), veh/h 175 1802 555 175 1254 554 210 917 772 559 1283 1085 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 23.6 16.6 14.3 24.6 18.3 16.6 24.0 19.0 19.3 18.7 11.7 12.0 Incr Delay (d2), s/veh 6.7 0.4 0.0 5.9 1.1 0.5 5.4 0.2 0.4 9.9 0.1 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 2.1 0.2 0.4 2.6 0.9 0.7 0.3 0.4 4.9 0.6 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.3 16.9 14.4 30.4 19.4 17.0 29.4 19.2 19.6 28.6 11.8 12.2 LnGrp LOS C B B C B B C B B C B B
Approach Vol, veh/h 869 711 130 564
Approach Delay, s/veh 18.2 19.5 23.6 23.1
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 16.7 11.8 5.8 17.6 6.7 21.7 7.5 15.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 16.0 25.0 5.0 18.0 6.0 35.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 12.3 3.3 2.9 8.6 3.5 4.4 4.4 9.5 Green Ext Time (p_c), s 0.4 0.2 0.0 3.2 0.0 0.8 0.0 1.9 Intersection Summary
HCM 7th Control Delay, s/veh 20.1
HCM 7th LOS C
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 24 651 247 111 458 21 129 26 181 41 56 14 Future Volume (veh/h) 24 651 247 111 458 21 129 26 181 41 56 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 28 748 284 128 526 24 148 30 208 47 64 16 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 59 1050 453 164 1259 557 189 416 351 89 310 259 Arrive On Green 0.03 0.29 0.29 0.09 0.35 0.35 0.10 0.22 0.22 0.05 0.16 0.16 Sat Flow, veh/h 1810 3610 1558 1810 3610 1596 1810 1900 1606 1810 1900 1583 Grp Volume(v), veh/h 28 748 284 128 526 24 148 30 208 47 64 16 Grp Sat Flow(s),veh/h/ln 1810 1805 1558 1810 1805 1596 1810 1900 1606 1810 1900 1583 Q Serve(g_s), s 0.7 8.5 7.2 3.2 5.1 0.5 3.6 0.6 5.3 1.2 1.3 0.4 Cycle Q Clear(g_c), s 0.7 8.5 7.2 3.2 5.1 0.5 3.6 0.6 5.3 1.2 1.3 0.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 59 1050 453 164 1259 557 189 416 351 89 310 259 V/C Ratio(X) 0.47 0.71 0.63 0.78 0.42 0.04 0.78 0.07 0.59 0.53 0.21 0.06 Avail Cap(c_a), veh/h 198 1502 648 198 1502 664 198 999 844 238 1040 867 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.7 14.5 14.0 20.3 11.3 9.8 19.9 14.2 16.0 21.2 16.5 16.1 Incr Delay (d2), s/veh 5.7 0.9 1.4 15.0 0.2 0.0 17.4 0.1 1.6 4.8 0.3 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.6 2.0 1.8 1.4 0.1 2.2 0.2 1.6 0.5 0.5 0.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.4 15.4 15.5 35.3 11.6 9.9 37.4 14.2 17.6 26.0 16.9 16.2 LnGrp LOS C B B D B A D B B C B B
Approach Vol, veh/h 1060 678 386 127
Approach Delay, s/veh 15.7 16.0 24.9 20.2
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.2 14.0 8.1 17.3 8.8 11.5 5.5 19.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 24.0 5.0 19.0 5.0 25.0 5.0 19.0 Max Q Clear Time (g_c+I1), s 3.2 7.3 5.2 10.5 5.6 3.3 2.7 7.1 Green Ext Time (p_c), s 0.0 0.7 0.0 2.4 0.0 0.3 0.0 2.3 Intersection Summary
HCM 7th Control Delay, s/veh 17.6
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 306 0 576 437 448 456 303 1210 2 2 1519 224 Future Volume (veh/h) 306 0 576 437 448 456 303 1210 2 2 1519 224 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 373 0 702 604 446 556 370 1476 2 2 1852 273 Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 555 0 493 847 445 753 368 2405 3 5 1801 559
Arrive On Green 0.16 0.00 0.16 0.24 0.24 0.24 0.11 0.46 0.46 0.00 0.36 0.36 Sat Flow, veh/h 3506 0 3114 3506 1841 3116 3401 5183 7 1753 5025 1559 Grp Volume(v), veh/h 373 0 702 604 446 556 370 954 524 2 1852 273 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1839 1753 1675 1559 Q Serve(g_s), s 12.0 0.0 19.0 18.9 29.0 19.8 13.0 25.6 25.6 0.1 43.0 16.4 Cycle Q Clear(g_c), s 12.0 0.0 19.0 18.9 29.0 19.8 13.0 25.6 25.6 0.1 43.0 16.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 555 0 493 847 445 753 368 1554 853 5 1801 559 V/C Ratio(X) 0.67 0.00 1.42 0.71 1.00 0.74 1.00 0.61 0.61 0.42 1.03 0.49 Avail Cap(c_a), veh/h 555 0 493 847 445 753 368 1554 853 73 1801 559 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 47.6 0.0 50.5 41.7 45.5 42.0 53.5 24.1 24.1 59.7 38.5 30.0 Incr Delay (d2), s/veh 3.2 0.0 202.3 2.8 43.3 3.9 48.0 0.7 1.3 50.9 28.9 0.7 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.3 0.0 21.0 8.2 18.0 7.7 7.8 9.4 10.5 0.1 21.1 5.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 50.7 0.0 252.8 44.5 88.8 45.9 101.5 24.8 25.4 110.6 67.4 30.6 LnGrp LOS D F D F D F C C F F C
Approach Vol, veh/h 1075 1606 1848 2127
Approach Delay, s/veh 182.7 57.3 40.3 62.7
Approach LOS F E D E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.3 59.7 23.0 17.0 47.0 33.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 51.0 19.0 13.0 43.0 29.0 Max Q Clear Time (g_c+I1), s 2.1 27.6 21.0 15.0 45.0 31.0 Green Ext Time (p_c), s 0.0 9.6 0.0 0.0 0.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 74.6
HCM 7th LOS E
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 803 32 38 595 72 97
Future Volume (veh/h) 803 32 38 595 72 97
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 912 36 43 676 82 110
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1467 58 89 2108 126 169
Arrive On Green 0.41 0.41 0.05 0.58 0.18 0.18
Sat Flow, veh/h 3635 140 1810 3705 718 964
Grp Volume(v), veh/h 465 483 43 676 193 0
Grp Sat Flow(s),veh/h/ln 1805 1874 1810 1805 1691 0
Q Serve(g_s), s 6.8 6.8 0.8 3.2 3.5 0.0
Cycle Q Clear(g_c), s 6.8 6.8 0.8 3.2 3.5 0.0
Prop In Lane 0.07 1.00 0.42 0.57
Lane Grp Cap(c), veh/h 748 777 89 2108 296 0
V/C Ratio(X) 0.62 0.62 0.48 0.32 0.65 0.00
Avail Cap(c_a), veh/h 1412 1467 272 3803 865 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 7.7 7.7 15.4 3.5 12.8 0.0
Incr Delay (d2), s/veh 0.9 0.8 4.0 0.1 2.4 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.2 1.2 0.3 0.0 1.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 8.5 8.5 19.4 3.6 15.2 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 948 719 193
Approach Delay, s/veh 8.5 4.6 15.2
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 9.8 5.6 17.8 23.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 17.0 5.0 26.0 35.0
Max Q Clear Time (g_c+I1), s 5.5 2.8 8.8 5.2
Green Ext Time (p_c), s 0.4 0.0 5.0 4.3
Intersection Summary
HCM 7th Control Delay, s/veh 7.7
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 189 370 298 145 332 238 227 919 135 248 1185 152 Future Volume (veh/h) 189 370 298 145 332 238 227 919 135 248 1185 152 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 220 430 347 169 386 277 264 1069 157 288 1378 177 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 311 950 733 247 884 392 357 1719 526 388 1764 547 Arrive On Green 0.09 0.26 0.26 0.07 0.24 0.24 0.10 0.33 0.33 0.11 0.34 0.34 Sat Flow, veh/h 3510 3610 2785 3510 3610 1602 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 220 430 347 169 386 277 264 1069 157 288 1378 177 Grp Sat Flow(s),veh/h/ln 1755 1805 1392 1755 1805 1602 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 4.3 7.1 7.5 3.3 6.4 11.2 5.2 12.4 5.2 5.7 17.0 5.8 Cycle Q Clear(g_c), s 4.3 7.1 7.5 3.3 6.4 11.2 5.2 12.4 5.2 5.7 17.0 5.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 311 950 733 247 884 392 357 1719 526 388 1764 547 V/C Ratio(X) 0.71 0.45 0.47 0.69 0.44 0.71 0.74 0.62 0.30 0.74 0.78 0.32 Avail Cap(c_a), veh/h 345 1724 1330 247 1623 720 395 1822 557 493 1968 610 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.5 21.9 22.1 32.3 22.7 24.5 31.1 20.0 17.7 30.7 21.1 17.4 Incr Delay (d2), s/veh 5.8 0.3 0.5 7.6 0.3 2.3 6.5 0.6 0.3 4.5 1.9 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 2.7 2.2 1.6 2.5 4.0 2.3 4.3 1.7 2.4 6.1 1.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 37.3 22.3 22.5 40.0 23.1 26.9 37.6 20.6 18.0 35.2 23.0 17.8 LnGrp LOS D C C D C C D C B D C B
Approach Vol, veh/h 997 832 1490 1843
Approach Delay, s/veh 25.7 27.8 23.4 24.4
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.9 27.6 9.0 22.7 11.2 28.2 10.3 21.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 25.0 5.0 34.0 8.0 27.0 7.0 32.0 Max Q Clear Time (g_c+I1), s 7.7 14.4 5.3 9.5 7.2 19.0 6.3 13.2 Green Ext Time (p_c), s 0.2 5.2 0.0 4.0 0.1 5.2 0.0 3.0 Intersection Summary
HCM 7th Control Delay, s/veh 24.9
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 6 729 157 95 497 12 154 6 167 29 16 9 Future Volume (veh/h) 6 729 157 95 497 12 154 6 167 29 16 9 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 8 911 196 119 621 15 192 8 209 36 20 11 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 26 1256 542 180 1557 38 308 13 285 110 61 34 Arrive On Green 0.01 0.35 0.35 0.10 0.43 0.43 0.18 0.18 0.18 0.11 0.11 0.11 Sat Flow, veh/h 1810 3610 1559 1810 3600 87 1740 73 1607 966 537 295 Grp Volume(v), veh/h 8 911 196 119 311 325 200 0 209 67 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1559 1810 1805 1881 1813 0 1607 1798 0 0 Q Serve(g_s), s 0.3 13.5 5.7 3.9 7.2 7.2 6.2 0.0 7.5 2.1 0.0 0.0 Cycle Q Clear(g_c), s 0.3 13.5 5.7 3.9 7.2 7.2 6.2 0.0 7.5 2.1 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.05 0.96 1.00 0.54 0.16
Lane Grp Cap(c), veh/h 26 1256 542 180 781 814 321 0 285 206 0 0 V/C Ratio(X) 0.30 0.73 0.36 0.66 0.40 0.40 0.62 0.00 0.73 0.33 0.00 0.00 Avail Cap(c_a), veh/h 207 1651 713 296 914 953 563 0 499 206 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 29.9 17.4 14.9 26.6 11.9 11.9 23.3 0.0 23.8 24.9 0.0 0.0 Incr Delay (d2), s/veh 6.3 1.1 0.4 4.1 0.3 0.3 2.0 0.0 3.7 0.9 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 4.6 1.7 1.7 2.3 2.4 2.6 0.0 2.7 0.9 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.2 18.5 15.3 30.7 12.2 12.2 25.3 0.0 27.5 25.8 0.0 0.0 LnGrp LOS D B B C B B C C C
Approach Vol, veh/h 1115 755 409 67
Approach Delay, s/veh 18.1 15.1 26.4 25.8
Approach LOS B B C C
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 14.8 10.1 25.3 11.0 4.9 30.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 19.0 10.0 28.0 7.0 7.0 31.0 Max Q Clear Time (g_c+I1), s 9.5 5.9 15.5 4.1 2.3 9.2
Green Ext Time (p_c), s 1.2 0.1 5.1 0.0 0.0 3.3
Intersection Summary
HCM 7th Control Delay, s/veh 18.8
HCM 7th LOS B
h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 64 440 196 293 256 55 130 92 252 83 176 15 Future Volume (veh/h) 64 440 196 293 256 55 130 92 252 83 176 15 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.92 1.00 0.91 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 75 518 231 345 301 65 153 108 296 98 207 18 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 97 712 317 436 965 430 233 766 596 140 707 61 Arrive On Green 0.05 0.20 0.20 0.12 0.27 0.27 0.07 0.40 0.40 0.08 0.41 0.41 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1480 1810 1707 148 Grp Volume(v), veh/h 75 518 231 345 301 65 153 108 296 98 0 225 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1480 1810 0 1856 Q Serve(g_s), s 3.3 10.8 10.8 7.7 5.4 2.5 3.4 2.9 12.0 4.3 0.0 6.5 Cycle Q Clear(g_c), s 3.3 10.8 10.8 7.7 5.4 2.5 3.4 2.9 12.0 4.3 0.0 6.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.08
Lane Grp Cap(c), veh/h 97 712 317 436 965 430 233 766 596 140 0 768 V/C Ratio(X) 0.77 0.73 0.73 0.79 0.31 0.15 0.66 0.14 0.50 0.70 0.00 0.29 Avail Cap(c_a), veh/h 202 1120 500 523 1255 560 349 802 624 180 0 783 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 37.6 30.3 30.3 34.3 23.6 22.5 36.7 15.2 17.9 36.3 0.0 15.8 Incr Delay (d2), s/veh 12.0 1.4 3.2 6.8 0.2 0.2 3.1 0.1 0.6 8.2 0.0 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.7 4.4 4.1 3.4 2.1 0.9 1.5 1.1 3.6 2.1 0.0 2.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 49.6 31.8 33.5 41.1 23.8 22.7 39.8 15.3 18.6 44.5 0.0 16.0 LnGrp LOS D C C D C C D B B D B
Approach Vol, veh/h 824 711 557 323
Approach Delay, s/veh 33.9 32.1 23.8 24.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.2 36.5 14.0 19.9 9.3 37.3 8.3 25.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 34.0 12.0 25.0 8.0 34.0 9.0 28.0 Max Q Clear Time (g_c+I1), s 6.3 14.0 9.7 12.8 5.4 8.5 5.3 7.4 Green Ext Time (p_c), s 0.0 1.5 0.3 3.0 0.1 1.1 0.0 1.8 Intersection Summary
HCM 7th Control Delay, s/veh 29.8
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 56 605 25 44 265 73 42 50 139 231 37 82 Future Volume (veh/h) 56 605 25 44 265 73 42 50 139 231 37 82 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 70 756 31 55 331 91 52 62 174 289 46 102 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 114 1141 506 97 1109 492 182 343 289 427 476 397 Arrive On Green 0.06 0.32 0.32 0.05 0.31 0.31 0.05 0.18 0.18 0.12 0.25 0.25 Sat Flow, veh/h 1810 3610 1603 1810 3610 1602 3510 1900 1602 3510 1900 1584 Grp Volume(v), veh/h 70 756 31 55 331 91 52 62 174 289 46 102 Grp Sat Flow(s),veh/h/ln 1810 1805 1603 1810 1805 1602 1755 1900 1602 1755 1900 1584 Q Serve(g_s), s 1.8 8.8 0.7 1.4 3.4 2.0 0.7 1.3 4.9 3.8 0.9 2.5 Cycle Q Clear(g_c), s 1.8 8.8 0.7 1.4 3.4 2.0 0.7 1.3 4.9 3.8 0.9 2.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 114 1141 506 97 1109 492 182 343 289 427 476 397 V/C Ratio(X) 0.62 0.66 0.06 0.56 0.30 0.18 0.29 0.18 0.60 0.68 0.10 0.26 Avail Cap(c_a), veh/h 222 1923 854 185 1849 821 360 1362 1149 575 1479 1233 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.3 14.4 11.6 22.5 12.9 12.4 22.3 16.9 18.4 20.5 14.0 14.7 Incr Delay (d2), s/veh 5.3 0.7 0.1 5.0 0.1 0.2 0.9 0.2 2.0 1.9 0.1 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 2.7 0.2 0.6 1.0 0.6 0.3 0.5 1.6 1.4 0.3 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.6 15.1 11.7 27.6 13.0 12.6 23.1 17.2 20.4 22.4 14.1 15.0 LnGrp LOS C B B C B B C B C C B B
Approach Vol, veh/h 857 477 288 437
Approach Delay, s/veh 16.0 14.6 20.2 19.8
Approach LOS B B C B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.9 12.8 6.6 19.4 6.5 16.2 7.1 19.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 35.0 5.0 26.0 5.0 38.0 6.0 25.0 Max Q Clear Time (g_c+I1), s 5.8 6.9 3.4 10.8 2.7 4.5 3.8 5.4 Green Ext Time (p_c), s 0.2 0.8 0.0 4.1 0.0 0.5 0.0 2.0 Intersection Summary
HCM 7th Control Delay, s/veh 17.1
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 22 334 378 151 165 101 199 885 202 160 1175 26 Future Volume (veh/h) 22 334 378 151 165 101 199 885 202 160 1175 26 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 23 355 402 161 176 107 212 941 215 170 1250 28 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 89 1087 484 246 1793 549 307 1792 549 237 1689 517 Arrive On Green 0.03 0.30 0.30 0.07 0.35 0.35 0.09 0.35 0.35 0.07 0.33 0.33 Sat Flow, veh/h 3510 3610 1609 3510 5187 1587 3510 5187 1588 3510 5187 1588 Grp Volume(v), veh/h 23 355 402 161 176 107 212 941 215 170 1250 28 Grp Sat Flow(s),veh/h/ln 1755 1805 1609 1755 1729 1587 1755 1729 1588 1755 1729 1588 Q Serve(g_s), s 0.5 5.6 17.3 3.3 1.7 3.5 4.3 10.7 7.6 3.5 15.9 0.9 Cycle Q Clear(g_c), s 0.5 5.6 17.3 3.3 1.7 3.5 4.3 10.7 7.6 3.5 15.9 0.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 89 1087 484 246 1793 549 307 1792 549 237 1689 517 V/C Ratio(X) 0.26 0.33 0.83 0.65 0.10 0.20 0.69 0.53 0.39 0.72 0.74 0.05 Avail Cap(c_a), veh/h 237 1559 695 332 2380 728 474 2450 750 237 2100 643 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.4 20.1 24.1 33.6 16.4 17.0 32.8 19.4 18.4 33.9 22.2 17.2 Incr Delay (d2), s/veh 1.5 0.2 5.7 2.9 0.0 0.2 2.8 0.2 0.5 10.0 1.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 2.1 6.5 1.4 0.6 1.1 1.8 3.8 2.5 1.7 5.7 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.9 20.2 29.9 36.5 16.4 17.2 35.6 19.6 18.8 43.9 23.3 17.2 LnGrp LOS D C C D B B D B B D C B
Approach Vol, veh/h 780 444 1368 1448
Approach Delay, s/veh 25.7 23.9 22.0 25.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.0 29.6 9.2 26.3 10.5 28.1 5.9 29.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 7.0 32.0 10.0 30.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 5.5 12.7 5.3 19.3 6.3 17.9 2.5 5.5 Green Ext Time (p_c), s 0.0 6.8 0.1 2.8 0.2 6.2 0.0 1.3 Intersection Summary
HCM 7th Control Delay, s/veh 24.2
HCM 7th LOS C
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 49 1003 218 235 551 43 145 487 174 43 602 48 Future Volume (veh/h) 49 1003 218 235 551 43 145 487 174 43 602 48 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 52 1067 232 250 586 46 154 518 185 46 640 51 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 161 1332 593 348 1432 112 243 920 407 150 1184 364 Arrive On Green 0.05 0.37 0.37 0.10 0.42 0.42 0.07 0.25 0.25 0.04 0.23 0.23 Sat Flow, veh/h 3510 3610 1608 3510 3391 266 3510 3610 1597 3510 5187 1595 Grp Volume(v), veh/h 52 1067 232 250 311 321 154 518 185 46 640 51 Grp Sat Flow(s),veh/h/ln 1755 1805 1608 1755 1805 1852 1755 1805 1597 1755 1729 1595 Q Serve(g_s), s 1.0 18.1 7.3 4.7 8.2 8.3 2.9 8.5 6.7 0.9 7.4 1.7 Cycle Q Clear(g_c), s 1.0 18.1 7.3 4.7 8.2 8.3 2.9 8.5 6.7 0.9 7.4 1.7 Prop In Lane 1.00 1.00 1.00 0.14 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 161 1332 593 348 762 782 243 920 407 150 1184 364 V/C Ratio(X) 0.32 0.80 0.39 0.72 0.41 0.41 0.63 0.56 0.45 0.31 0.54 0.14 Avail Cap(c_a), veh/h 257 1534 683 411 846 868 257 1692 749 257 2432 748 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.5 19.3 15.9 29.8 13.8 13.8 30.9 22.1 21.4 31.7 23.2 21.0 Incr Delay (d2), s/veh 1.1 2.8 0.4 4.9 0.4 0.3 4.6 0.5 0.8 1.1 0.4 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 7.0 2.4 2.1 2.9 3.0 1.3 3.1 2.3 0.4 2.6 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 32.7 22.1 16.3 34.7 14.1 14.1 35.5 22.7 22.2 32.8 23.6 21.2 LnGrp LOS C C B C B B D C C C C C
Approach Vol, veh/h 1351 882 857 737
Approach Delay, s/veh 21.5 20.0 24.9 24.0
Approach LOS C B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.9 21.4 10.8 29.2 8.7 19.6 7.1 32.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 32.0 8.0 29.0 5.0 32.0 5.0 32.0 Max Q Clear Time (g_c+I1), s 2.9 10.5 6.7 20.1 4.9 9.4 3.0 10.3 Green Ext Time (p_c), s 0.0 3.5 0.1 5.0 0.0 3.9 0.0 3.6 Intersection Summary
HCM 7th Control Delay, s/veh 22.4
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 146 828 156 152 526 43 196 615 135 170 737 177 Future Volume (veh/h) 146 828 156 152 526 43 196 615 135 170 737 177 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 154 872 164 160 554 45 206 647 142 179 776 186 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 262 1680 514 264 1683 508 308 1366 424 283 1328 412 Arrive On Green 0.07 0.32 0.32 0.08 0.32 0.32 0.09 0.26 0.26 0.08 0.26 0.26 Sat Flow, veh/h 3510 5187 1586 3510 5187 1565 3510 5187 1608 3510 5187 1608 Grp Volume(v), veh/h 154 872 164 160 554 45 206 647 142 179 776 186 Grp Sat Flow(s),veh/h/ln 1755 1729 1586 1755 1729 1565 1755 1729 1608 1755 1729 1608 Q Serve(g_s), s 2.6 8.5 4.9 2.8 5.0 1.2 3.5 6.5 4.4 3.1 8.2 6.1 Cycle Q Clear(g_c), s 2.6 8.5 4.9 2.8 5.0 1.2 3.5 6.5 4.4 3.1 8.2 6.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 262 1680 514 264 1683 508 308 1366 424 283 1328 412 V/C Ratio(X) 0.59 0.52 0.32 0.61 0.33 0.09 0.67 0.47 0.34 0.63 0.58 0.45 Avail Cap(c_a), veh/h 338 2582 790 338 2582 779 395 2749 852 507 2915 904 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.9 17.1 15.9 27.9 15.9 14.6 27.5 19.3 18.5 27.7 20.3 19.5 Incr Delay (d2), s/veh 2.1 0.2 0.4 2.2 0.1 0.1 2.9 0.3 0.5 2.3 0.4 0.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 2.9 1.5 1.1 1.6 0.4 1.4 2.2 1.4 1.2 2.7 2.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.0 17.4 16.2 30.1 16.0 14.7 30.4 19.6 19.0 30.1 20.7 20.3 LnGrp LOS C B B C B B C B B C C C
Approach Vol, veh/h 1190 759 995 1141
Approach Delay, s/veh 18.8 18.9 21.7 22.1
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.0 20.4 8.7 24.2 9.5 19.9 8.7 24.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 9.0 33.0 6.0 31.0 7.0 35.0 6.0 31.0 Max Q Clear Time (g_c+I1), s 5.1 8.5 4.8 10.5 5.5 10.2 4.6 7.0 Green Ext Time (p_c), s 0.2 4.4 0.1 6.1 0.1 5.5 0.1 3.5 Intersection Summary
HCM 7th Control Delay, s/veh 20.5
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/27/2025 Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 43 91 280 163 106 59 180 876 211 44 939 18 Future Volume (veh/h) 43 91 280 163 106 59 180 876 211 44 939 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 47 99 304 177 115 64 196 952 229 48 1021 20 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 80 460 382 220 607 505 241 1421 341 81 1308 404 Arrive On Green 0.04 0.24 0.24 0.12 0.32 0.32 0.13 0.34 0.34 0.04 0.25 0.25 Sat Flow, veh/h 1810 1900 1576 1810 1900 1579 1810 4173 1001 1810 5187 1604 Grp Volume(v), veh/h 47 99 304 177 115 64 196 788 393 48 1021 20 Grp Sat Flow(s),veh/h/ln 1810 1900 1576 1810 1900 1579 1810 1729 1716 1810 1729 1604 Q Serve(g_s), s 1.6 2.7 11.6 6.1 2.8 1.8 6.7 12.4 12.5 1.7 11.7 0.6 Cycle Q Clear(g_c), s 1.6 2.7 11.6 6.1 2.8 1.8 6.7 12.4 12.5 1.7 11.7 0.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.58 1.00 1.00
Lane Grp Cap(c), veh/h 80 460 382 220 607 505 241 1178 585 81 1308 404 V/C Ratio(X) 0.59 0.22 0.80 0.80 0.19 0.13 0.81 0.67 0.67 0.59 0.78 0.05 Avail Cap(c_a), veh/h 142 655 543 255 774 643 283 1246 618 142 1463 452 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.9 19.3 22.7 27.3 15.7 15.4 26.9 18.0 18.0 29.9 22.2 18.1 Incr Delay (d2), s/veh 6.6 0.2 5.4 14.9 0.1 0.1 14.3 1.3 2.6 6.7 2.5 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 1.1 4.3 3.3 1.1 0.6 3.4 4.1 4.3 0.8 4.2 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.6 19.6 28.1 42.2 15.9 15.5 41.1 19.3 20.6 36.6 24.7 18.1 LnGrp LOS D B C D B B D B C D C B
Approach Vol, veh/h 450 356 1377 1089
Approach Delay, s/veh 27.1 28.9 22.8 25.1
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.9 25.7 11.8 19.5 12.5 20.1 6.8 24.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 23.0 9.0 22.0 10.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.7 14.5 8.1 13.6 8.7 13.7 3.6 4.8 Green Ext Time (p_c), s 0.0 4.3 0.0 1.0 0.1 2.3 0.0 0.7 Intersection Summary
HCM 7th Control Delay, s/veh 24.8
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 17 4 36 89 10 48 52 1245 120 60 1287 27 Future Volume (veh/h) 17 4 36 89 10 48 52 1245 120 60 1287 27 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 19 4 40 98 11 53 57 1368 132 66 1414 30 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 43 19 187 279 345 289 103 1901 588 114 1931 585 Arrive On Green 0.02 0.13 0.13 0.08 0.18 0.18 0.06 0.37 0.37 0.06 0.37 0.37 Sat Flow, veh/h 1810 148 1484 3510 1900 1589 1810 5187 1604 1810 5187 1570 Grp Volume(v), veh/h 19 0 44 98 11 53 57 1368 132 66 1414 30 Grp Sat Flow(s),veh/h/ln 1810 0 1633 1755 1900 1589 1810 1729 1604 1810 1729 1570 Q Serve(g_s), s 0.5 0.0 1.1 1.2 0.2 1.2 1.3 9.9 2.5 1.6 10.3 0.5 Cycle Q Clear(g_c), s 0.5 0.0 1.1 1.2 0.2 1.2 1.3 9.9 2.5 1.6 10.3 0.5 Prop In Lane 1.00 0.91 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 43 0 205 279 345 289 103 1901 588 114 1931 585 V/C Ratio(X) 0.45 0.00 0.21 0.35 0.03 0.18 0.55 0.72 0.22 0.58 0.73 0.05 Avail Cap(c_a), veh/h 207 0 969 401 1128 943 207 2132 659 207 2132 645 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.1 0.0 17.2 19.1 14.7 15.2 20.1 11.9 9.6 20.0 11.9 8.8 Incr Delay (d2), s/veh 7.1 0.0 0.5 0.8 0.0 0.3 4.5 1.1 0.2 4.6 1.2 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 0.3 0.4 0.1 0.4 0.6 2.5 0.6 0.7 2.6 0.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 28.2 0.0 17.7 19.8 14.8 15.5 24.6 13.0 9.8 24.5 13.1 8.8 LnGrp LOS C B B B B C B A C B A
Approach Vol, veh/h 63 162 1557 1510
Approach Delay, s/veh 20.9 18.1 13.1 13.5
Approach LOS C B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.8 20.0 7.5 9.5 6.5 20.3 5.0 12.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 18.0 5.0 26.0 5.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.6 11.9 3.2 3.1 3.3 12.3 2.5 3.2 Green Ext Time (p_c), s 0.0 4.0 0.0 0.1 0.0 3.8 0.0 0.2 Intersection Summary
HCM 7th Control Delay, s/veh 13.7
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 137 0 193 0 0 0 180 1289 0 0 1238 171 Future Volume (veh/h) 137 0 193 0 0 0 180 1289 0 0 1238 171 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 152 0 214 0 0 0 200 1432 0 0 1376 190 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 1035 0 321 0 379 0 253 3189 0 0 1982 615
Arrive On Green 0.20 0.00 0.20 0.00 0.00 0.00 0.14 0.61 0.00 0.00 0.38 0.38 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 152 0 214 0 0 0 200 1432 0 0 1376 190 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 1.6 0.0 5.3 0.0 0.0 0.0 4.6 6.3 0.0 0.0 9.6 3.6 Cycle Q Clear(g_c), s 1.6 0.0 5.3 0.0 0.0 0.0 4.6 6.3 0.0 0.0 9.6 3.6 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 1035 0 321 0 379 0 253 3189 0 0 1982 615 V/C Ratio(X) 0.15 0.00 0.67 0.00 0.00 0.00 0.79 0.45 0.00 0.00 0.69 0.31 Avail Cap(c_a), veh/h 2129 0 823 0 971 0 294 3615 0 0 2290 711 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 14.4 0.0 15.9 0.0 0.0 0.0 17.9 4.4 0.0 0.0 11.2 9.3 Incr Delay (d2), s/veh 0.1 0.0 2.4 0.0 0.0 0.0 11.9 0.1 0.0 0.0 0.8 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 1.6 0.0 0.0 0.0 2.2 0.4 0.0 0.0 2.2 0.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 14.5 0.0 18.3 0.0 0.0 0.0 29.8 4.5 0.0 0.0 12.0 9.6 LnGrp LOS B B C A B A
Approach Vol, veh/h 366 0 1632 1566
Approach Delay, s/veh 16.7 0.0 7.6 11.7
Approach LOS B A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 30.5 12.6 10.0 20.4 12.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 30.0 22.0 7.0 19.0 22.0
Max Q Clear Time (g_c+I1), s 8.3 7.3 6.6 11.6 0.0
Green Ext Time (p_c), s 9.5 1.4 0.0 4.8 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 10.3
HCM 7th LOS B
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Project Dwy G/Jet Way 01/01/2026
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 44 0 212 60 0 12 275 1719 73 10 1636 51 Future Volume (veh/h) 44 0 212 60 0 12 275 1719 73 10 1636 51 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 1870 1900 1900 1900 1900 1870 Adj Flow Rate, veh/h 0 0 272 71 0 14 289 2022 86 12 1925 54 Peak Hour Factor 0.95 0.95 0.95 0.85 0.95 0.85 0.95 0.85 0.85 0.85 0.85 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 2 0 0 0 0 2
Cap, veh/h 0 244 414 275 0 207 342 3327 1033 27 2412 737 Arrive On Green 0.00 0.00 0.13 0.13 0.00 0.13 0.19 0.64 0.64 0.02 0.46 0.46 Sat Flow, veh/h 0 1870 3170 1125 0 1585 1781 5187 1610 1810 5187 1585 Grp Volume(v), veh/h 0 0 272 71 0 14 289 2022 86 12 1925 54 Grp Sat Flow(s),veh/h/ln 0 1870 1585 1125 0 1585 1781 1729 1610 1810 1729 1585 Q Serve(g_s), s 0.0 0.0 4.6 3.3 0.0 0.4 8.8 12.9 1.1 0.4 17.8 1.1 Cycle Q Clear(g_c), s 0.0 0.0 4.6 3.3 0.0 0.4 8.8 12.9 1.1 0.4 17.8 1.1 Prop In Lane 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 244 414 275 0 207 342 3327 1033 27 2412 737 V/C Ratio(X) 0.00 0.00 0.66 0.26 0.00 0.07 0.85 0.61 0.08 0.44 0.80 0.07 Avail Cap(c_a), veh/h 0 597 1011 487 0 506 379 3327 1033 160 2574 787 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 0.0 0.0 23.3 22.8 0.0 21.5 22.0 5.9 3.8 27.5 12.8 8.4 Incr Delay (d2), s/veh 0.0 0.0 1.8 0.5 0.0 0.1 15.0 0.3 0.0 10.5 1.8 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 1.7 0.8 0.0 0.2 4.4 1.9 0.2 0.2 4.8 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 25.1 23.3 0.0 21.6 37.0 6.3 3.9 38.1 14.6 8.4 LnGrp LOS C C C D A A D B A
Approach Vol, veh/h 272 85 2397 1991
Approach Delay, s/veh 25.1 23.0 9.9 14.6
Approach LOS C C A B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.9 40.2 11.4 14.8 30.2 11.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 35.0 18.0 12.0 28.0 18.0 Max Q Clear Time (g_c+I1), s 2.4 14.9 6.6 10.8 19.8 5.3 Green Ext Time (p_c), s 0.0 13.7 0.8 0.1 6.4 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 13.0
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 7 h 1 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 319 203 0 1735 1707 625
Future Volume (veh/h) 319 203 0 1735 1707 625
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 384 193 0 1928 1897 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 690 307 0 3222 3222
Arrive On Green 0.19 0.19 0.00 0.62 0.62 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 384 193 0 1928 1897 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 4.1 4.7 0.0 9.5 9.3 0.0
Cycle Q Clear(g_c), s 4.1 4.7 0.0 9.5 9.3 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 690 307 0 3222 3222
V/C Ratio(X) 0.56 0.63 0.00 0.60 0.59
Avail Cap(c_a), veh/h 1277 568 0 4515 4515
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 15.6 15.8 0.0 4.9 4.8 0.0
Incr Delay (d2), s/veh 0.7 2.1 0.0 0.2 0.2 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.5 1.6 0.0 0.5 0.5 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 16.3 17.9 0.0 5.0 5.0 0.0
LnGrp LOS B B A A
Approach Vol, veh/h 577 1928 1897
Approach Delay, s/veh 16.8 5.0 5.0
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 30.4 12.1 30.4
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 37.0 15.0 37.0
Max Q Clear Time (g_c+I1), s 11.5 6.7 11.3
Green Ext Time (p_c), s 14.9 1.4 14.7
Intersection Summary
HCM 7th Control Delay, s/veh 6.6
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.