Bakersfield  San Luis Obispo  Long Beach | www.dpsiinc.com October 2, 2026
Silvia Arizaga
City of Bakersfield’s Water Department
1501 Truxtun Avenue
Bakersfield, CA 93301
Subject: Project No. 27WDWR06 Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation Dear Ms. Arizaga:

Thank you for the opportunity to submit our proposal for the Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation project. Our services include CCTV inspection and condition assessment of the intake and return pipelines, diversion planning, rehabilitation recommendations, and preparation of design plans, specifications, and an engineer’s estimate.

Established in 2007, DPSI brings together licensed civil and mechanical engineers, land surveyors, certified inspectors, and construction managers to support public works and infrastructure projects. Our mechanical integrity and engineering teams combine experience in embedded piping assessments and rehabilitation design, providing continuity from field inspection through the completed design package.

For Truxtun Lakes, our approach connects documented pipeline conditions with practical rehabilitation recommendations and coordinated design. Close communication with City staff throughout inspection, engineering, and review will support completion of the final plans, specifications, and engineer’s estimate by May 31, 2027.

We appreciate your consideration and look forward to supporting the City of Bakersfield on this project.

Sincerely,
Espiri Ferreira, PE
Director of Mechanical Engineering
Diversified Project Services International, Inc.

CSLB 973308 | DIR #1000005579 | UEI GNKAG9NG9X76
5351 Olive Drive, Suite 100
Bakersfield, CA 93308
[email protected]
(661) 371-2800
Bakersfield  San Luis Obispo  Long Beach | www.dpsiinc.com October 2, 2026
Silvia Arizaga
City of Bakersfield
1000 Buena Vista Road
Bakersfield, CA 93311
via email: [email protected]
SUBJECT: PROPOSAL FOR SERVICES | TRUXTUN LAKES CARRIER SPREADING FACILITY PIPELINE REHABILITATION – BAKERSFILED, CALIFORNIA
Dear Ms. Arizaga:

We are pleased to provide you with this proposal for CCTV inspection, pipeline condition assessment, diversion planning, and rehabilitation design for the Truxtun Lakes Carrier Spreading Facility in Bakersfield, California. We understand the City seeks to assess the structural integrity of the existing intake and return pipelines, develop rehabilitation plans and specifications, and obtain an engineer’s estimate by May 31, 2027. DPSI’s experience assessing embedded reinforced concrete piping, supported by our in-house engineering team, will provide continuity from field inspection through rehabilitation design, bidding and construction.

Diversified Project Services International, Inc. (DPSI) will provide the following services as described below.

SCOPE OF SERVICES
DPSI will assess the existing intake and return pipelines at the Truxtun Lakes Carrier Spreading Facility and use the findings to support rehabilitation recommendations and design. Based on the City’s available records, the return pipe is a 30-inch reinforced concrete pipe (RCP), and the intake pipe is believed to be a 36-inch RCP, its size and configuration will be verified to the extent accessible during the assessment.

CCTV INSPECTION AND CONDITION ASSESSMENT
DPSI will perform closed-circuit television (CCTV) inspections using a remotely operated camera crawler with pan, tilt, and zoom capabilities. PACP-trained personnel will document observed conditions using NASSCO PACP coding, where applicable.

The inspection will identify and record visible defects, obstructions, connections, infiltration, and other conditions relevant to the pipelines’ structural condition and rehabilitation design. DPSI will review the video and inspection records and summarize the findings for each pipeline.

Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 2 DPSI will coordinate access and inspection activities with the City and provide a qualified standby rescue team for confined-space entry associated with the CCTV inspection. The camera crawler will inspect the pipelines remotely, with personnel entering access structures as needed to deploy and retrieve the equipment.

SURVEY
A topographic survey is needed to provide the existing condition of a site for design purposes. We will prepare a topographic survey of the site showing the following information:
 Elevations based North American Vertical Datum of 1988 (NAVD 88)  Horizontal control based on North American Datum of 1983 (NAD 83)  Obtain design level topographic sections on 50-foot stations, including all visible features within the 25-foot corridor of the existing pipeline.
 Locate and collect all curbs, flowlines, lip of gutters, back of sidewalk, driveways, curb ramps, median curbs, street crown, fences, retaining walls, trees, signs, striping, railroad tracks, monuments, trench scars, and buildings
 Locate and collect visible utility features (valves, meters, cleanouts, manholes, inlets, fire hydrants, vaults, poles, streetlights, traffic signals, USA markings, etc.)  Obtain rim and invert elevations for all manholes and inlets. Provide pipe sizes, directions and include photos of inside structures with indication of north arrow direction on photo

DIVERSION PLAN
DPSI will create a detailed specification for temporarily diverting flow from the Carrier Canal. DPSI will gather and clearly delineate the information required for bidding and designing a temporary hydraulic system that will accommodate a safe dry-work area for access to the project site while minimizing interruption to canal operations.

The specification will outline additional requirements, including but not limited to noise mitigation, on-site system monitoring/operation, automation of the hydraulic system, local and remote alarms for site conditions, etc.

DPSI will provide engineering support for the temporary diversion system during the contractor bidding, design, installation and operation phases.

AS-BUILT/REHABILITATION RECOMMENDATIONS DESIGN
DPSI will create an as-built of the existing Intake line which routes water from the southern canal to Lake #1 in the south east corner of the lake from the MI and Survey data. As-built plans will consist of a Plan/Elevation View, along with details of both ends of the line. DPSI will review MI Inspection report to determine where failed piping location occurred. Two to three repair options will be investigated and summarized in a report. Detail rehabilitation plans will be developed and will include a Plan/Elevation View, along with details of the repair option. The 100% IFC plans will be stamped and signed and sealed by a California Registered Engineer.

Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 3 DPSI will prepare and provide technical specifications for the project work to be incorporated into the construction bid package. Owner will provide their standard contract documentation intended for this project at the 60 percent review phase. The technical specifications will be prepared and provided for Owner’s review at the 90% review phase.

The Engineer’s Estimate will be the engineer’s opinion of the probable cost to construct the project. It will be prepared and based upon available data and the estimated quantities of work to be completed.

Every effort to account for the effect of inflation and oscillating construction costs will be made but the engineer will make no guarantee as to actual costs received at bid opening.

BIDDING AND CONSTRUCTION SUPPORT
DPSI will assist the City of Bakersfield in the bidding process in order to subcontract grading/earthwork and pipeline repairs for the project. Bidding and construction support services will consist of answering RFI’s during the bidding and construction process, along with preparing any necessary plan revisions or addenda, providing submittal reviews, and attending construction site meetings as necessary.

DELIVERABLES
CCTV Assessment
 CCTV inspection video of the accessible portions of the intake and return pipelines in .mp4 format.
 Inspection records documenting the location and condition of observed defects, obstructions, connections, infiltration, and other relevant findings, with NASSCO PACP coding where applicable.
 A condition assessment report for both pipelines, including an executive summary, representative photographs, inspection limitations, and findings relevant to rehabilitation design.

Survey
 CAD drawing of as-built of intake pipeline
Diversion Plan
 Diversion Plan Specification
As-built/Rehabilitation Recommendations Design
 As-built consisting of one Plan/Elevation View, and one detail sheet of both ends of the line  Repair options summary report
 Detail Rehabilitation consisting of one Plan/Elevation View, and one detail sheet of proposed repair
 Technical Specifications document
 Engineer’s Estimate of Construction Cost
Bidding and Construction Support
 Bid packages for earthwork and pipeline repairs
 Plan revisions or addenda (if necessary)
 RFI responses (as needed)
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 4

SCHEDULE
Work will begin upon receiving authorization to proceed. The proposed sequence below allows the CCTV findings to inform the rehabilitation design. Final plans, specifications, and the engineer’s estimate will be submitted by May 31, 2027. While every effort will be made to adhere to the schedule provided, unexpected field conditions, design constraints, or other conditions may arise that extend out the estimated schedule. DPSI will keep the client informed on any substantial changes to the scheduling for deliverables.

MILESTONE SCHEDULE
Kickoff, site coordination, and diversion planning Upon Authorization to Proceed CCTV inspection of Lake 1 4 field days, 1 week reporting CCTV inspection of Lake 2 5 field days, 1 week reporting Survey 1 field day, 1 day office
Diversion Plan 1 field day, 2 weeks reporting
As-built Plans of Intake line 2 weeks
Condition assessment & rehabilitation recommendations 2 weeks Submit plans, specifications, and engineer’s estimate 4 months City approval of plans, specs, and estimate 4 weeks
Address City comments and submit final design package Before May 31, 2027

CLARIFICATIONS AND ASSUMPTIONS
The following clarifications and assumptions apply to this proposal and are in addition to those stated in the above scope descriptions:
 The City will provide available drawings, site aerials(*.TIFF), operating information, and any required site-specific safety and environmental orientation for DPSI and the rescue team.  The City will coordinate the necessary flow restrictions and provide the pipelines isolated, accessible, and sufficiently cleaned for CCTV inspection.  The CCTV crawler is submersible but is not intrinsically safe. DPSI and the City will review atmospheric conditions and applicable equipment and permit requirements before inspection.  A qualified standby rescue team is included for confined-space entry associated with CCTV equipment deployment and retrieval. Access points must be available and suitable for the planned entry and rescue procedures.
 In the event that structural voids, gaps, or discontinuities are encountered that exceed the crawler's safe traversal capability, the inspection will be suspended at that location. This precautionary protocol is strictly observed to mitigate the risk of equipment entrapment and to ensure the crawler can be safely retrieved without damage or loss.  Cleaning, debris removal, construction of new access points, and crawler recovery requiring excavation or other construction work are excluded unless expressly included elsewhere in the proposal.
 Any site-specific Safety and Environmental training required for DPSI personnel is to be provided by the City’s EH&S department.

Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 5  Additional work or delays caused by circumstances beyond DPSI’s reasonable control will be billed on a Time and Material basis.
 Invert location at both end of the pipes will be accessible.  Require accessibility to the south side of the carrier canal for survey.  The diversion plan is included in the proposed engineering scope. Responsibility for installing and operating a temporary diversion must be defined separately.  The city will provide information required to formulate the diversion plan specification. Such information includes but is not limited to the following:
o Minimum, maximum, and average flowrates.
o Maximum canal water solids size.
o Allowable suction and discharge locations.
o Site elevation (in ft above sea level) where pumps will be located. o Site elevation (in ft above sea level) where the diversion will discharge. o Any pertinent elevations between the suction and discharge location. o Minimum, maximum suction and discharge site water depths (in ft above sea level) in canal.
o Upstream and downstream retention volumes (allows for a calculation of reaction time available for a backup pump to turn on or a crew to react in the case of a failure) o Invert elevation (in ft above sea level) of canal.
o Allowable water fluctuation depth and fluctuation frequency in canal. o Pressures required at tie-point locations (if applicable) o Sound constraints
o Required local and remote alarms: LAH, LAHH, LAL, LALL, Backup Pump On, Primary Pump Off, low battery, other diagnostic alarms, etc.
o Pump automation vs manual operation preferences.
o Preferred automated pump operation, if applicable: single-speed float on/off, transducer linear throttle control, transducer target level control. Specification of suction-side or discharge-side driven controls. Local and remote-control preferences. o Reverse-flow requirements.
o Hours of operation for temporary system.
o Preferred pipe materials: HDPE, Aluminum IG, HD Tank hose, etc.  Costs assume that there will be one round of review and comments per 30%, 60%, 90% submittal by City to capture redlines.
 Drawings not clearly specified in this proposal are not included in scope.  Drawings will utilize the DPSI standard title block template unless one is provided by the City.  Proposal assumes construction permit is not required for this project.

ADDITIONAL SERVICES
The following services can be provided under an Additional Services Agreement:
 Permitting services if required
 Grading and erosion plans if required
 Traffic Control Plan if needed
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 6

FEE SUMMARY

DESCRIPTION ESTIMATED T&M FEE FIXED FEE
Phase 1: Project coordination and mobilization $4,750
Phase 2: CCTV inspection, including standby rescue team $48,264 Phase 3: Condition assessment report and inspection videos $16,680 Phase 4: Survey $5,365
Phase 5: Diversion Plan $6,300
Phase 6: As-built/Rehab Plans, Specs, and Engineers Estimate $88,825 Phase 7: Bidding and Construction Support $30,150
TOTALS $99,844 $100,490
 The fees stated above are based on prevailing wage rates.  The rates are subject to change to reflect increases to the general prevailing wage determinations made by the Director of Industrial Relations.  Reimbursable expenses, including but not limited to reproduction costs, are in addition to the fees quoted above.

SCHEDULE OF VALUES (FOR FIXED FEES)

PROJECT PHASE BILLING AMOUNT
Ph.4 – Costs due upon completion of field work $5,365
Ph.5 – Costs due upon submittal of Diversion plan $6,300 Ph.6 – Costs due upon submittal of as-built plan and Recommendation Report $28,765 Ph.6 – Costs due upon submittal of 30% Rehabilitation Plans $30,030 Ph.6 – Costs due upon submittal of 60% Rehabilitation Plans $15,015 Ph.6 – Costs due upon submittal of 90% Rehabilitation Plans $7,508 Ph.6 – Costs due upon submittal of 1000% Rehabilitation Plans $7,508 Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 7

TERMS AND CONDITIONS
This agreement consists of the scope of services, the following terms, and any exhibits or applicable documents attached. This agreement supersedes any and all prior negotiations, correspondence, or agreements either written or oral. Any changes to this agreement must be mutually agreed to in writing.

DPSI bills weekly for work in progress according to the Schedule of Values above and payment is due no later than 30 days of receipt of the bill. Overdue amounts will be surcharged at 18 percent per annum or

1.5 percent monthly.

If the terms of this proposal are acceptable, please sign the following acceptance and return a copy, which will serve as our notice to proceed. The fees quoted in this proposal are valid for 60 days from this date.

If you have any questions or would like clarification on the scope of services or fees outlined above, please do not hesitate to contact us. We thank you for this opportunity to offer our services.

Respectfully submitted,
DIVERSIFIED PROJECT SERVICES INTERNATIONAL, INC.

Espiri Ferreira, PE
Director of Mechanical Engineering
[email protected]
(661) 371-2800
Enclosures:

Attachment A | Terms for DPSI Services
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 8

ACCEPTANCE OF TERMS AND AUTHORIZATION TO PROCEED
Proposal Date: October 2, 2026
Project Name: Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation Client agrees to accept work described in this proposal letter, including all terms and conditions, to be executed as of the date noted below. Payment is NOT contingent on third-party funds. Each of the signatories below represents that he or she is authorized to enter into this agreement.

City of Bakersfield Diversified Project Services International, Inc.

Signature Date Signature Date
Print Name Print Name
Title Title
Billing Email:
(for electronic invoices)
Billing Address:
(if different than mailing address)
Billing Code:
(i.e. PO, AFE, NWA, etc.)
Tasks Authorized:
(All tasks authorized unless otherwise noted)
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 9 ATTACHMENT A: TERMS FOR DPSI SERVICES
These Standard Terms and Conditions, together with our proposal and any exhibits or attachments noted in the proposal, make up the agreement between Diversified Project Services International (DPSI) and Client. Together these elements will constitute the entire agreement superseding any and all prior negotiations, correspondence, or agreements either written or oral. Any changes to this agreement must be mutually agreed to in writing.

1.0 Standard of Care

1.1 Data, interpretations, and recommendations by DPSI will be based solely on information provided to DPSI. DPSI is responsible for those data, interpretations, and recommendations, but will not be responsible for other parties' interpretations or use of the information developed.

1.2 Services performed by DPSI under this agreement are expected by the Client to be conducted in a manner consistent with the level of care and skill ordinarily exercised by members of this profession practicing contemporaneously under similar conditions in the locality of the project. No other warranty, expressed or implied, is made.

1.3 The Client agrees that DPSI may use and publish the Client's name and a general description of DPSI services with respect to the project in describing DPSI experience and qualifications to other clients and prospective clients. The Client also agrees that any patentable or copyrightable concepts developed by DPSI as a consequence of service hereunder are the sole and exclusive property of DPSI.

1.4 The Client recognizes that it is neither practical nor customary for DPSI to include all construction details in plans and specifications, creating a need for interpretation by DPSI or an individual who is under DPSI supervision. The Client also recognizes that construction review permits require DPSI to identify and correct quickly and at comparatively low cost professional errors or omissions that are revealed through construction, or errors or omissions committed by others due to misinterpretation of design documents, or due to other causes. For the foregoing reasons construction review is generally considered an essential element of a complete design professional service. Accordingly, if the Client directs DPSI not to provide construction monitoring, DPSI shall not be responsible for the consequences of any of DPSI acts, errors or omissions, except for those consequences which it reasonably could be concluded that DPSI review services would not have prevented or mitigated.

1.5 Client acknowledges that DPSI is not responsible for the performance of work by third parties including, but not limited to, engineers, architects, contractors, subcontractors, or suppliers of Client.

2.0 Billing and Payment

2.1 Invoices will be submitted to Client on a weekly basis (no longer than monthly) by DPSI and will be due and payable within 30 days of receipt of invoice. If Client objects to all or any portion of any invoice, Client will so notify DPSI in writing within fourteen (14) of the invoice date, identify the cause of the disagreement, and pay when due that portion of the invoice not in dispute. The parties will immediately make every effort to settle the disputed portion of the invoice. In the absence of written notification described above, the balance as stated on the invoice will be paid.

2.2 Invoices are delinquent if payment has not been received within forty-five (45) days from receipt of invoice. Client will pay an additional charge of 1-1/2 (1.5) percent per month or 18% per year of any delinquent amount, excepting any portion of the invoiced amount in dispute and resolved in favor of Client. All time spent and expenses incurred (including any attorney's fees) in connection with collection of any delinquent amount will be paid by Client to DPSI per DPSI current fee schedule. In the event Client fails to pay DPSI within sixty (60) days after invoices are rendered, Client agrees that DPSI will have the right to consider the failure to pay DPSI invoice as a breach of this agreement.

2.3 Client agrees that if Client requests services not specified herein, Client agrees to timely pay for all such services as extra work. DPSI will notify the Client prior to performance of services which are not specified in this agreement.

2.4 Client agrees that payment to DPSI is in no way contingent on the results of work by DPSI or on the outcome of any litigation.

2.5 Preparation and/or travel time will be charged at the hourly rate.

Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 10

3.0 Additional Services

3.1 Additional services include making revisions in drawings, specifications or other documents when such revisions are: Inconsistent with approvals or instructions previously given by the Client, including revisions made necessary by adjustments in the Client's program or project budget; Required by the enactment or revision or codes, laws or regulations subsequent to the preparation of such documents.

3.2 Additional services include providing services required because of significant changes in the project including, but not limited to, size, quality, complexity, the Client's schedule, or the method of bidding or negotiating and contracting for construction.

3.3 Where unexpected developments increase the scope of work as defined herein and/or prove the assumptions of this proposal invalid, we will make a reasonable effort to contact you to discuss the effects and adjustment of cost.

4.0 Site Access and Site Conditions

4.1 Client will grant or obtain free access to the site for all equipment and personnel necessary for DPSI to perform the work set forth in this agreement. Client will notify any and all possessors of the project site that Client has granted DPSI free access to the site. DPSI will take reasonable precautions to minimize damage to the site, but it is understood by Client that, in the normal course of work, some damage may occur and the correction of such damage is not part of this agreement unless so specified in the proposal.

5.0 Ownership of Documents

5.1 All reports, maps, plans, field data, field notes, estimates and other documents, whether in hard copy or machine readable form, which are prepared by DPSI as instruments of professional service, shall remain the property of DPSI. The Client may retain copies, including copies stored on magnetic tape or disk, for information and for reference in connection with the occupancy and use of the project.

5.2 Because of the possibility that information and data delivered in machine readable form may be altered, whether inadvertently or otherwise, DPSI reserves the right to retain the original tapes/disks and to remove from copies provided to the Client all identification reflecting the involvement of DPSI in their preparation. DPSI also reserves the right to retain hard copy originals of all project documentation delivered to the Client in machine readable form, which originals shall be referred to and shall govern in the event of any inconsistency between the two.

5.3 The Client recognizes that changes or modifications to DPSI instruments of professional service introduced by anyone other than DPSI may result in adverse consequences which DPSI can neither predict nor control. Therefore, and in consideration of DPSI ' agreement to deliver its instruments of professional service in machine readable form, the Client agrees, to the fullest extent permitted by law, to hold harmless and indemnify DPSI from and against all claims, liabilities, losses, damages, and costs, including but not limited to attorney's fees, arising out of or in any way connected with the modification, misinterpretation, misuse or reuse by others of the machine readable information and data provided by DPSI under this Agreement. The foregoing indemnification applies, without limitation, to any use of the project documents on other projects, for additions to this project, or for completion of this project by others, excepting only such use as may be authorized, in writing, by DPSI.

5.4 Client agrees that all reports and other work furnished to Client or his agents, which are not paid for, will be returned upon demand and will not be used by Client or others for any purpose whatsoever.

6.0 Client Responsibilities

6.1 The Client shall provide full information including a program setting forth the Client's design objectives, constraints, and construction budget criteria.

6.2 The Client shall furnish a legal description, a certified land survey, and the services of a soil, structural, mechanical, electrical or other engineer or consultant services, and laboratory tests, inspections, or Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 11 reports as required by law or as requested by DPSI to perform the functions and services required of this agreement. The information shall be furnished at the Client's expense and DPSI shall be entitled to rely upon the accuracy and completeness thereof.

6.3 The Client shall furnish all legal, accounting and insurance counseling services as may be necessary at any time for the project, including auditing services the Client may require to verify the Contractor's Applications for Payment or to ascertain how or for what purposes the Contractor uses the moneys paid by the Client. The information above shall be furnished at the Client's expense, and DPSI shall be entitled to rely upon the accuracy and completeness thereof.

6.4 If the Client observes or otherwise becomes aware of any fault or defect in the project or nonconformance with the Contract Documents, prompt written notice shall be given by the Client to DPSI.

6.5 The Client shall furnish information and shall review DPSI work and provide decisions as expeditiously as necessary for the orderly progress of the project and of DPSI services.

7.0 Insurance

7.1 DPSI represents and warrants that it and its agents, staff and consultants employed by it, is and are protected by workman's compensation insurance and that DPSI has such coverage under public liability and property damage insurance policies which DPSI deems to be adequate. Certificates for all such policies of insurance shall be provided to Client upon request in writing. Within the limits and conditions of such insurance, DPSI agrees to indemnify and save Client harmless from and against any loss, damage or liability arising from any negligent acts by DPSI, its agents, staff, and consultants employed by it. DPSI shall not be responsible for any loss, damage or liability beyond the amounts, limits, and conditions of such insurance. DPSI shall not be responsible for any loss, damage, or liability arising from any acts by client, its agents, staff, and other consultants employed by client.

8.0 Termination

8.1 This agreement may be terminated by either party seven (7) days after written notice in the event of any breach of any provision of this agreement or in the event of substantial failure of performance by the other party, or if Client suspends the work for more than three (3) months. In the event of termination, DPSI will be paid for services performed prior to the date of termination plus reasonable termination expenses including the cost of completing analyses, records and reports necessary to document job status at the time of termination.

8.2 Failure of the client to make payments to DPSI when due in accordance with this agreement shall be considered substantial nonperformance and cause for termination. If the Client fails to make payment when due to DPSI for services and expenses, DPSI may, upon seven (7) days written notice to the client, suspend performance of services under this agreement. Unless payment in full is received by DPSI within seven (7) days of the date of the notice, the suspension shall take effect without further notice. In the event of a suspension of services, DPSI shall have no liability to the client for delay, damage, loss of agency approvals, loss of financing, interest expenses, etc. caused the Client because of such suspension of service.

9.0 Disputes Resolution

9.1 All claims, disputes, and other matters in controversy between DPSI and Client arising out of or related to this agreement will be submitted to "alternative dispute resolution" (ADR) such as mediation and/or arbitration, before and as a condition precedent to other remedies provided by law. If and to the extent Client and DPSI have agreed on methods for resolving such disputes, then such methods will be set forth in the "alternative dispute resolution agreement" which, if attached, is incorporated and made a part of this agreement.

9.2 If a dispute at law related to the services provided under this agreement and that dispute requires litigation instead of ADR as provided upon, then:

Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 12

9.2.1 The claim will be brought and tried in judicial jurisdiction of the court of the county where DPSI principal place of business is located and client waives the right to remove the action to any other county or judicial jurisdiction, and;

9.2.2 The prevailing party will be entitled to recovery of all reasonable costs incurred, including staff time, court costs, attorney's fees, and other claim related expenses.

10.0 Assigns

10.1 DPSI shall not assign this agreement in whole or in part nor shall it subcontract any portion of the work to be performed hereunder; except that DPSI may use the services of persons of entities not in our employ when it is appropriate and customary to do so. Such persons and entities include, but are not necessarily limited to, specialized consultants and testing laboratories. DPSI use of others for additional services shall not be unreasonably restricted by the client provided DPSI notifies the client in advance.

11.0 Governing Law and Survival

11.1 The law of the State of California will govern the validity of these terms, their interpretation and performance.

11.2 If any of the provisions contained in this agreement are held illegal, invalid or unenforceable, the enforceability of the remaining provisions will not be impaired. Limitations of liability and indemnities will survive termination of this agreement for any cause.

12.0 Indemnification

12.1 To the fullest extent permitted by law, both Parties shall release, protect, indemnify, and hold free and harmless each other from any and all liabilities, judgments, demands, claims, bodily injuries, damages, losses and expenses, including but not limited to reasonable attorneys’ fees and costs arising out of or resulting from or attributable in any way to injury to or death of persons, and direct damages to or loss of real or personal property, to the extent caused directly and solely by their negligent acts or omissions or for any and all direct losses due to any infringement of any proprietary interest which in whole or in part, arise out of, relate to, result from, or are connected with any infringement or violation.