RESOLUTION NO.
MAKING FINDINGS REQUIRED UNDER
GOVERNMENT CODE SECTION 4217.10 TO
4217.18, AUTHORIZING CITY OF BAKERFIELD
TO ENTER INTO AN ENERGY SAVINGS
PERFORMANCE CONTRACT WITH WILLDAN
ENERGY SOLUTIONS FOR EFFICIENCY AND
INFRASTRUCUTRE IMPROVEMENTS PROJECTS.
WHEREAS, City of Bakersfield (“City”) selected Willdan Energy Solutions (“Willdan”) through a competitive Request for Qualifications (“RFQ”) process to support City with energy conservation design-build services; and WHEREAS, on June 25, 2025, City and Willdan entered Agreement No. 2025- 106 the purpose of which was for Willdan to conduct an Investment Grade Audit (“IGA”) of City’s Public Works Department Fleet and Fleet Infrastructure with aim to facilitate advancement in fleet transition to Zero Emission Vehicles, and WHEREAS, Willdan has completed the IGA, which includes an in-depth analysis of the financial aspects of energy savings and return on investment from changes or upgrades to City facilities that are in alignment with addressing core infrastructure needs and efficiency improvements; and
WHEREAS, the scopes of work identified in the Energy Savings Performance Contract (“ESPC”) are a result of recommendations from the IGA, which prioritizes measures that include time-restricted incentives for equipment and upgrades based to various systems; and
WHEREAS, California Government Code Sections 4217.10 to 4217.18, authorizes City to enter into a ESPC for the implementation of energy-related improvements if the Council finds that is in the best interest of City to enter into such agreement and that the anticipated cost to the City for electrical energy or conservation services provided by Willdan under the contract will be less than the anticipated marginal cost to City of the electrical energy that would have been consumed by City in the absence of the actions contemplated in the ESPC; and WHEREAS, the anticipated cost to City for electrical energy or conservation services provided under the ESPC will be less than the anticipated marginal costs of City of electrical energy that would have been consumed by City in the absence of the implementation of the improvements under the ESPC; and WHEREAS, the total cost of the Project is $19,922,436 and if all measures are
constructed, the anticipated lifetime (20-year) incentives and savings are outlined in Summary of Findings, attached as Exhibit A; and WHEREAS, staff has identified funding within the Equipment Fund, Water Fund, Sewer Fund, and Refuse Fund for the capital costs necessary to complete this infrastructure project; and
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:
1. The above recitals are true and correct and incorporated herein by reference.
2. The Council hereby finds that it is in the best interest of City to enter into the Energy Savings Performance Contract.
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on , by the following vote:
AYES: COUNCIL MEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCIL MEMBER
ABSTAIN: COUNCIL MEMBER
ABSENT: COUNCIL MEMBER
JULIE DRIMAKIS, CMC
CITY CLERK AND EX OFFICIO of the
Council of the City of Bakersfield
APPROVED
By:
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By:
ASHLEY ZAMBRANO
Chief Assistant City Attorney
COUNTERSIGNED:
By:
RANDY MCKEEGAN
Finance Director
Exhibits: A – Summary of Findings
City of Bakersfield – EV Infrastructure & Fleet
Transition Investment Grade Audit
2033+ ACF Compliance Plan Project
Investment Grade Audit Summary of Findings
I. Project
Overview
The Investment Grade Audit (IGA) was conducted by Willdan for the City of Bakersfield in coordination with Fleet Services, Public Works, Water Resources, Solid Waste, and Wastewater staff. The 2033+ Advanced Clean Fleets (ACF) Compliance Plan Project is the first construction project delivered under the City's Zero-Emission Vehicle (ZEV) Fleet Transition Master Plan. The project will cover eight (8) sites at seven (7) City facilities:
Site Facility City Funding Source
1530 Eye St. South City Hall – Public Works
Annex General Fund
1000 Buena Vista Rd. Water Resources Office Domestic Water Enterprise 2601 S Mt Vernon Ave. Mt. Vernon Green Waste Organics & Recycling Facility Solid Waste Enterprise
2260 S Union Ave. Materials Recovery Facility Solid Waste Enterprise 6901 Mc Cutchen Rd. Wastewater Treatment Plant No. 3 Sewer Enterprise 1700 E Planz Rd. Wastewater Treatment Plant No. 2 Sewer Enterprise 4101 Truxtun Ave. – Parcel A Corporation Yard General Fund, Solid Waste & Sewer
4101 Truxtun Ave. – Parcel C Corporation Yard General Fund, Solid Waste & Sewer
Scope
Design, procurement, and installation of electric vehicle charging station (EVCS) infrastructure to support 395 City vehicles and equipment, including approximately 320 ACF-regulated vehicles:
133 installed charging ports (63 Level 2, 69 DC fast charging, 1 forklift).
EXHIBIT A - Summary of Findings
136 make-ready ports (117 Level 2, 19 DC fast) for future chargers without re-trenching or service upsizing.
New dedicated PG&E electrical services, switchgear, and make-ready infrastructure. Site civil and parking improvements at 1000 Buena Vista Rd. and 6901 Mc Cutchen Rd. Five (5) years of charger networking, maintenance, extended warranty, Register all EVCS with CARB to generate LCFS credits.
Goals
1. ACF Milestone Compliance: Phase infrastructure ahead of vehicle deliveries to meet ACF milestones through 2033 (Groups 1 and 2) and 2036 (Group 3). Avoid penalties of up to $10,000 per day per non-compliant vehicle.
2. Utility and Operating Cost Savings: Replace gasoline, diesel, CNG, and LNG fuel with off-peak electricity on PG&E's BEV-2 rate. Reduce vehicle maintenance costs. Hedge against fuel price volatility.
3. Future-Proof Infrastructure: Install upsized switchgear and make-ready ports now to support long-term fleet growth and avoid future re-work and cost escalation.
4. Leverage Available Funding Sources: Capture time-limited PG&E EV Fleet Program rebates, SJVAPCD Charge Up! vouchers, and ongoing Low Carbon Fuel Standard (LCFS) credit revenue.
II. Core Financial Findings
Project Financial Data
Guaranteed Maximum Price (GMAX): $19,922,435 (includes 5 years of networking and maintenance SLA).
Secured Incentives: $1,572,200 ($1,422,200 PG&E EV Fleet Program + $150,000 SJVAPCD Charge Up!).
Net Project Cost to City: $18,350,235
Projected Year 1 Net Operational Savings: $1,169,356 ($709,897 avoided fuel, less $329,952 new electricity, plus $514,176 maintenance savings and estimated $394,209 in LCFS credits, less $118,975 charger O&M).
Guaranteed Year 1 Net Energy Savings: $331,692 (tied to 97% charger uptime). Program Term: 20 years
Total Net Operational Savings Over Program Term: $50,473,679 (discounted 2026 $; avoided fuel costs, maintenance costs, and LCFS credits; less electricity and charger O&M).
Net Program Benefit: $26,387,752 cumulative net present value (2026 $) over the program term; cumulative cash flow turns positive in 2039. Excluding avoided CNG/LNG fueling station capital, the NPV is $22,072,467.
Annual GHG Reduction: 1,915 metric tons CO2e (216,395 gallons of gasoline equivalent avoided)
Results by Funding Source
City Funding
Source GMAX Cost Incentives Net Cost Year 1 Net Savings 20-yr
Cumulative NPV
Solid Waste
Enterprise $8,263,243 $606,276 $7,656,967 $685,423 $18,713,814 General Fund $5,662,996 $552,959 $5,110,037 $353,270 $9,178,771 Sewer Enterprise $4,346,005 $354,965 $3,991,040 $96,651 ($694,797) Domestic Water
Enterprise $1,650,192 $58,000 $1,592,192 $34,011 ($810,033) Total $19,922,435 $1,572,200 $18,350,235 $1,169,356 $26,387,752 *Corporation Yard costs and incentives are allocated by each fund's share of annual kWh at full electrification.
Conclusion
The anticipated cost to the City under the proposed contract is less than the anticipated marginal cost to the City for fuel, electrical energy, and vehicle maintenance that would have been incurred without these improvements, on a project-wide basis over the 20-year program term.
III. Statutory Basis & Requirements
Statutory Overview (CA GC § 4217.12)
To authorize the project the following must be adequately met:
Utility Cost Savings: The anticipated cost to the City for the energy services and improvements will be less than the anticipated marginal cost of thermal, electrical, or other energy that would have been consumed by the agency in the absence of those purchases. Avoided gasoline, diesel, CNG, and LNG fuel are the "other energy" baseline for this project.
Operational Efficiency: The offered energy conservation services and facility alterations are necessary and appropriate for reducing overall utility or operating costs, and for meeting the City's CARB ACF obligations.
Funding Sufficiency: The project is paid in cash with no financing obligation. Projected savings over the 20-year term exceed the net project cost on a project-wide basis.
Exemptions & Procurement Exemption
This resolution authorizes the exemption from standard formal bidding procedures as permitted under California Government Code Section 4217.10 et seq., recognizing the specialized design-build and energy-saving nature of the procurement.
Public Hearing & Notice Compliance
Notice: Pursuant to GC Section 4217.18, a public notice was posted for two consecutive weeks prior to the public hearing.
Hearing Date: A duly noticed public hearing will be held during the regularly scheduled City Council meeting on November 18, 2026, to receive public comment regarding the proposed project and energy savings performance contract. Approval on this date is required to retain $1,422,200 in PG&E EV Fleet Program incentives.
IV. Action
Approval of resolution to enter into an energy savings performance contract with Willdan for the 2033+ ACF Compliance Plan EV charging infrastructure upgrades at eight (8) City sites.