ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Bids TO: Honorable Mayor and City Council
FROM: Daniel R. Maldonado, Water Director
DATE: November 3, 2026
SUBJECT: Wastewater Treatment Plants No. 2 and 3 Septage Receiving Station Improvements Accept bid and approve contract with GSE Construction Company Inc. ($1,107,007) for the Septage Receiving Station Improvement Project.

RECOMMENDATION:

Staff recommend acceptance of low bid and approval of contract.

BACKGROUND:

The Wastewater Division operates four septage receiving stations, with two septage receiving stations at Wastewater Treatment Plant No. 2 (WWTP2) and two septage receiving stations at Wastewater Treatment Plant No. 3 (WWTP3). These stations receive septage from permitted haulers and are equipped with processing units that remove rocks, gravel, rags, and coarse solids from the septage, which reduces the potential for damage to downstream equipment.

In Fiscal Year 2024-25, City completed construction of Project E3K304, which upgraded one of the septage receiving stations at WWTP3. The upgraded station has demonstrated consistent performance and confirmed the effectiveness of the new technology in meeting the operational requirements of the Wastewater Division.

At this time, both septage receiving stations at WWTP2 and one of the septage receiving stations at WWTP3 are nonfunctional and damaged beyond repair. With only one operational station in service, the Wastewater Division is unable to reliably accommodate the septage deliveries.

The work to be performed consists, in general, of replacing the two existing septage receiving units, including piping and valves at WWTP 2 and one existing septage receiving unit, including piping and valves at WWTP 3. The work also includes the installation of electrical and instrumentation equipment. Septage receiving units shall be provided by the City of Bakersfield.

The Engineer’s Estimate for this construction contract was $1,903,200. On October 29, 2026, five bids were received. The acceptable bids are as follows:

GSE Construction Company Inc. in the amount of $1,107,007.00 7633 Southfront Road, Suite 160
Livermore, CA 94551
Syblon Reid in the amount of $1,251,000.00
1130 Sibley Street
Folsom, CA 95630
Eclipse Construction Services, Inc. in the amount of $1,367,000.00 5401 Woodmere Drive
Bakersfield, CA 93313
HPS Mechanical, Inc. in the amount of $1,390,000.00
3100 E Belle Terrace
Bakersfield, CA 93307
Metro Builders & Engineering Group, Ltd in the amount of $1,750,570.00 2610 Avon Street, Suite A
Newport Beach, CA 92663
Staff recommend acceptance of the bids and approval of the construction contract to the lowest responsive and responsible bidder, GSE Construction Company Inc.

FISCAL IMPACT:

Sufficient funds are budgeted in the Sewer Enterprise Fund capital improvement program for this agreement. Therefore, there is no impact to the General Fund with award of this agreement.

COUNCIL GOAL:

Reliable Infrastructure