WHEREAS, the City Council held a duly noticed public hearing pursuant to law on the Agreement on June 1, 2022; and
WHEREAS, the City Council has reviewed the Development Agreement (DA 19-03) (attached as Exhibit “A” herewith and incorporated herein by reference) and finds and declares that compliance with all notice, hearing, and procedural requirements as set forth by law have been met, thus allowing the City Council to review and consider the approval of the attached Development Agreement (DA 19-03); and
WHEREAS, the City Council hereby specifically finds that the provisions of the Development Agreement (DA 19-03) are consistent with the General Plan of the City; and
WHEREAS, the City Council hereby specifically finds that the Development Agreement (DA 19-03) is compatible with the uses authorized in, and the regulations prescribed for, the land use district in which the real property is located within the Industrial Commercial I-C zone; and WHEREAS, the City Council hereby specifically finds that the Development Agreement (DA 19-03) is in conformance with the public convenience and general welfare of persons residing in the immediate area and will not be detrimental or injurious to property or persons in the general neighborhood or to the general welfare of the residents of the city as a whole; and
WHEREAS, the City Council hereby specifically finds that the Development Agreement (DA 19-03) is consistent with the provisions of California Government Code §§ 65864 - 65869.5.

WHEREAS, the findings set forth in the attached Development Agreement (DA 20-02) and as set forth in the Negative Declaration are hereby incorporated as findings by this City Council in adopting this ordinance, and WHEREAS, as required by law, the City Council gave first reading to the proposed ordinance on April 20, 2022.

NOW, THEREFORE BE IT ORDAINED by the City Council of the City of Baldwin Park, California, as follows:

SECTION 1. The City Council hereby certifies the Mitigated Negative Declaration, and based upon substantial evidence presented to the City Council during the above-referenced hearing, including the Initial Study, any public comments received during the public comment period of the Mitigated Negative Declaration, the written staff reports, verbal testimony, and the development plans, the City Council hereby finds that:

Ordinance ____

Page 3 ends

a) There is no substantial evidence that the project will have a significant effect on the environment; and
b) The negative declaration reflects the City's independent judgment and analysis; and
SECTION 2. The City Council hereby adopts the following findings of fact required by Subchapter 153.210.860 of the City’s Municipal Code relating to Development Agreements:
a) The development agreement is consistent with the General Plan objectives, policies, land uses and implementation programs and any other adopted plans or policies applicable to the agreement.

The proposed billboard structure is located along the I-10, San Bernardino Freeway. The subject site is not in a
General Plan focus area. However, the General Plan has
identified the general area for industrial uses. The
installation of billboards adjacent to the I-10 San Bernardino Freeway is a land use that is typically seen within industrial areas adjacent to freeways and would not conflict with future or existing larger scale industrial development.
b) The development agreement is compatible with the uses authorized in, and the regulations prescribed for, the land use district in which the real property is located.

The proposed billboard is compatible with other uses
allowed in the project site’s land use district and zone. The project site is zoned I-C, Industrial Commercial, which is compatible with the underlying “General Industrial” General Plan Land Use Designation. Furthermore, the property and project site is adequately adjacent to the I-10 San
Bernardino Freeway and said billboard structure is designed to advertise toward the freeway.
c) The development agreement is in conformance with the public convenience and general welfare of persons residing in the immediate area and will not be detrimental or injurious to property or persons in the general neighborhood or to the general welfare of the residents of the city as a whole.

As mentioned above, the digital-faced billboard is proposed to be located on a property zoned Industrial Commercial (I-C) and is developed with a multi-tenant industrial complex that is Ordinance ____

Page 4 ends

consistent with the zone. Furthermore, the construction of the proposed digital billboard will reduce vehicular trips and resources that would otherwise be required for the
maintenance or change-out of paper advertisements on a
conventional static billboard. As such, it is anticipated that the billboard structure will not be detrimental or injurious to the subject property or the general neighborhood as the surrounding/adjacent areas are also developed with non- residential uses.
d) The development agreement is consistent with the provisions of California Government Code §§ 65864 - 65869.5.

Pursuant to the City Attorney’s Office, along with review by the Chief Executive Officer and the Planning Division Staff, the Development Agreement (Reference Attachment #2) is
consistent with California Government Code Sections 65864- 65869.5.

SECTION 3. The City Council hereby approves and adopts the Development Agreement (DA 19-03), by and between Becker Boards Small, LLC and the City of Baldwin Park, in the form as attached hereto as Exhibit “A” and authorizes and directs the Mayor to sign it in the name of the City of Baldwin Park.

SECTION 4. The City Council directs the City staff to carry out the terms and conditions of the Development Agreement (DA 19-03) and make any modifications, amendments, or alterations to the Development Agreement (DA 20-02) as deemed administratively necessary from time to time.

SECTION 5. The City Council does hereby adopt the Condition of Approval applicable to the Development Agreement (DA 19-03):
a) Applicant shall submit a signed wet-stamped survey
prepared by a licensed engineer identifying that the distance between the proposed billboard structure at 1529 Virginia Avenue and any other billboard complies with the State of California Outdoor Advertising Act development standards and the Applicant agrees that their proposed billboard sign at 12921 Garvey Avenue will be built in conformance with the State of California Outdoor Advertising Act, including but not limited to being placed 500 feet or more from any other existing billboard.

Ordinance ____

Page 5 ends

____________________________________
SECTION 6. This ordinance shall go into effect and be in full force and operation from and after thirty (30) days after its final reading and adoption. ___________________________________
PASSED AND APPROVED ON THE __ day of , 2022
___________________________________
EMMANUEL J. ESTRADA, MAYOR
ATTEST:
___________________________________

MARLEN GARCIA,

CITY CLERK
___________________________________

STATE OF CALIFORNIA )
_____________
COUNTY OF LOS ANGELES ) ss:

CITY OF BALDWIN PARK )
________________________
I, MARLEN GARCIA, City Clerk of the City of Baldwin Park, do hereby certify that the foregoing ordinance was regularly introduced and placed upon its first reading at a regular meeting of the City Council on April 20, 2022. Thereafter, said Ordinance No. ____ was duly approved and adopted at a regular meeting ________________________________
_______
of the City Council on , 2022 by the following vote:

AYES: COUNCIL MEMBERS:

NOES: COUNCIL MEMBERS:

ABSTAIN: COUNCIL MEMBERS:

ABSENT: COUNCIL MEMBERS:

MARLEN GARCIA,

CITY CLERK

INITIAL STUDY AND MITIGATED NEGATIVE

DECLARATION

FOR THE

VIRGINIA AVENUE DIGITAL BILLBOARD PROJECT
JANUARY 25, 2022
Prepared for:

City of Baldwin Park –
Community Development Department
14403 E. Pacific Avenue
Baldwin Park, CA 91706
(626) 960-4011
Prepared by:

De Novo Planning Group
1020 Suncast Lane, Suite 106
El Dorado Hills, CA 95762
(916) 580-9818
D e N o v o P l a n n i n g G r o u p
A L a n d U s e P l a n n i n g , D e s i g n , a n d E n v i r o n m e n t a l F i r m

INITIAL STUDY AND

MITIGATED NEGATIVE DECLARATION

FOR THE

VIRGINIA AVENUE DIGITAL BILLBOARD PROJECT
JANUARY 25, 2022
Prepared for:

City of Baldwin Park –
Community Development Department
14403 E. Pacific Avenue
Baldwin Park, CA 91706
(626) 960-4011
Prepared by:

De Novo Planning Group
1020 Suncast Lane, Suite 106
El Dorado Hills, CA 95762
(916) 580-9818

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page i
Table of Contents
...............................

1.0 INTRODUCTION
................................................................ .................................................................................................................................... ............................................................ 1 ................................

2.0 PROJECT DESCRIPTION
........................................................................................................................................ ...................................................................... 3 ................................

3.0 ENVIRONMENTAL CHECKLIST FORM
............................................................................................................ ............................................................................................ 12 ................................

4.0 ENVIRONMENTAL ANALYSIS
................................................................................................................................... ............................................................................................. 15 ................................

4.1 Aesthetics
.............................................................................................................. ........................................................................................................................................... 15 ......................

4.2 Agriculture and Forestry Resources
................................................................................................ ................................................................................................................ 24 .....

4.3 Air Quality
................................................................................................ .............................................................................................. ......................................................................... 26 ................................

4.4 Biological Resources
........................................................................................................................ ......................................................................................................... 29 ................................

4.5 Cultural Resources ...................................................................................................................... .................................................................................................................... 32 ...

4.6 Energy
................................................................................................................................ ............................................................................................ ....................................
34 ................................

4.7 Geology and Soils
................................................................ ........................................................................................................... .............................................................. 36 ................................

4.8 Greenhouse Gas Emissions
...................................................................................................................... ................................................................................................. 40 ................................

4.9 Hazards and Hazardous Materials 43

4.10 Hydrology and Water Quality 46

4.11 Land Use and Planning 49

4.12 Mineral Resources 51

4.13 Noise 52

4.14 Population and Housing 56

4.15 Public Services 57

4.16 Recreation 59

4.17 Transportation 60

4.18 Tribal Cultural Resources 63

4.19 Utilities and Service Systems 65

4.20 Wildfire 67

4.21 Mandatory Findings of Significance 69

5.0 REFERENCES 71

6.0 REPORT PREPARATION PERSONNEL 74
Appendices
Appendix A – Sign Lighting Study
Appendix B – Approved Plans
Appendix C – Tribal Consultation Letters
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 1

1.0 INTRODUCTION

This Initial Study (IS) / Mitigated Negative Declaration (MND) evaluates the Virginia Avenue Digital Billboard Project (hereafter, “Project”) proposed by Lamar of Los Angeles (hereafter, “Project Applicant”).

The Project is proposed on the northern portio n of a parcel (hereafter “Project site”) located at 1529 Virginia Avenue, and immediately south of Interstate 10 in the City of Baldwin Park, Los Angeles County, California. The Project Applicant proposes to construct and operate a dual-faced, digital/light emitting diodes (LED) billboard with associated infrastructure connections on the Project site. Under existing conditions, the property is fully developed with a commercial/industrial use (i.e., Industrial Powder Coatings) to which the Project would contribute additional development in the form of a billboard.

1.1 Purpose of this Document
The Project is the subject of analysis in this document pursuant to the California Environmental Quality Act (CEQA). The content of this MND complies with all criteria, standards, and procedures of CEQA (California Public Resource Code Section 21000 et se q.) and the CEQA Guidelines (California Code of Regulations, Title 14, Division 6, Chapter 3, Section 15000 et seq.).

CEQA is a statewide environmental statute contained in Public Resources Code §§21000 -21177 that applies to most public agency decisions to carry out, authorize, or approve actions that have the potential to adversely affect the environment. CEQA requires that before a public agency makes a decision to approve a project that could have one or more adverse effects on the physical environmen t, the agency must inform itself about the project’s potential environmental impacts, give the public an opportunity to comment on the environmental issues, and take feasible measures to avoid or reduce potential harm to the physical environment.

As defined by CEQA Guidelines §15367, the City of Baldwin Park is the Lead Agency for the proposed Project. “Lead Agency” refers to the public agency that has the principal responsibility for carrying out or approving a project. One discretionary approval is required of the City of Baldwin Park to implement the proposed Project: a Development Agreement between the Project Applicant and Lead Agency.

Administrative approvals would consist of the issuance of a building permit. These actions and other approval act ions required of the City of Baldwin Park and/or other governmental agencies to fully implement the proposed Project are described in more detail in Section 2.0, Project Description. If this MND is approved by the City of Baldwin Park, Responsible and Trustee agencies with approval authorities over the Project can use this MND as the CEQA compliance document as part of their decision -making processes.

1.2 CEQA Requirements for Mitigated Negative Declarations A MND is a written statement by the Lead Agency briefly describing the reasons why a proposed project, which is not exempt from the requirements of CEQA, will not have a significant effect on the environment and therefore does not require preparation of an Environmental Impact Report (EIR) (CEQA Guidelines §15371). The CEQA Guidelines require the preparation of a MND if the Initial Study prepared for a project identifies potentially significant effects, but: 1) revisions in the project plans or proposals m ade by, or agreed to by the applicant before a proposed MND and Initial Study are released for public review would avoid or mitigate the effects where clearly no significant effects would occur; and 2) there is no substantial evidence, in light of the whol e record before the Lead Agency, that the project as revised may have a significant effect on the environment (CEQA Guidelines §15070[b]).

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 2

1.3 Format and Content of this Mitigated Negative Declaration The following items comprise the MND in its entirety:
1) This document, including all Sections. Section 3.0 contains the completed Environmental Checklist/Initial Study and Section 4.0 contains the proposed Project’s associated analyses, which documents the evidence relied upon to support the findings and conclusions of the Initial Study. 2) The Mitigation Monitoring and Reporting Program (MMRP), which lists the mitigation measures that the City of Baldwin Park has identified and imposed on the proposed P roject to ensure that the Project’s environmental effects are reduced to less -than-significant levels. The basis for the MMRP is found in the Environmental Checklist/Initial Study. The MMRP also indicates the required timing for the implementation of eac h mitigation measure, identifies the parties responsible for implementing and/or monitoring the mitigation measures, and identifies the level of significance following the incorporation of mitigation 3) One technical report is attached as Technical Appendix A. This report is also on file and available for public review at the City of Baldwin Park, Community Development Department (14403 East Pacific Avenue, Baldwin Park, CA 91706) and is hereby incorporated by reference pursuant to CEQA Guidelines §15150.

A. Sign Lighting Study, prepared by Daktronics, and dated December 11, 2020 4) Approved plans (elevations and colored renderings) are attached as Technical Appendix B. These plans are also on file and available for public review at the City of Baldwin Park, Community Development Department (14403 East Pacific Avenue, Baldwin Park, CA 91706) and is hereby incorporated by reference pursuant to CEQA Guidelines §15150.

A. Sign Elevations, prepared by RMG Outdoor Inc., and dated March 27, 2020 B. Sign Colored Renderings, prepared by Equity Sign Group, and dated July 8, 2020 5) Tribal consultation letters are attached as Technical Appendix C.

1.4 Preparation and Processing of this Mitigated Negative Declaration The City of Baldwin Park, Community Development Department, directed and supervised the preparation of this MND. Although prepared with assistance of the consulting firm De Novo Planning Group, the content contained within and the conclusions drawn by this MND reflect the sole independent judgment of the City of Baldwin Park.

This MND and a Notice of Intent (NOI) to adopt the MND will be distributed to the following entities for a 30-day public review period: 1) organizations and individuals who have previously requested such notice in writing to the City of Baldwin Park; 2) direct mailing to the owners of property contiguous to the Project site as shown on the latest equalized assessment roll; 3) responsible and trustee agencies (public agencies that have a level of discretionary approval over some component of the proposed Project); 4) the County of Los Angeles Clerk; and 5) the California Office of Planning and Research, State Clearinghouse, for review by State agencies. The NOI identifies the location(s) where the MND and its associated MMRP and Technical Appendices are available for public review. In addition, notice of the public review period also will occur via posting of a notice at City Hall (14403 East Pacific Avenue), via standard mailing to property owners located within a 300 -foot radius of the Project site, and publication in a newspaper of general circulation in the Project area. The NOI also establishes a 30-day public review period during which Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 3
comments on t he adequacy of the MND document may be provided to the City of Baldwin Park, Community Development Department.

Following the 30-day public review period, the City of Baldwin Park will review any and all comment letters received and determine whether any substantive comments were provided that may warrant revisions to the MND document. If substantial revisions are not necessary (as defined by CEQA Guidelines §15073.5(b)), then the MND will be finalized and forwarded to the City of Baldwin Park Planning Commission for review as part of their deliberations concerning the proposed Project. A public hearing(s) will be held before the City’s Planning Commission to consider the proposed Project and the adequacy of this MND. Public comments will be heard and considered at the hearing(s). If the MND is approved by the Planning Commission, the Project would be recommended for approval to the City of Baldwin Park City Council. If approved, City Council would adopt findings relative to the Project’s environmental effects as disclosed in the MND and a Notice of Determination (NOD) will be filed with the County of Los Angeles Clerk.

2.0 PROJECT DESCRIPTION

2.1 Project Location
The Virginia Avenue Digital Billboard Project (Project) site is located in the City of Baldwin Park within the County of Los Angeles; refer to Figure 1, Regional Vicinity. The City of Baldwin Park is located in the south- central portion of Los Angeles County and is bordered to the north by the City of Irwindale, to the east by the City of West Covina, to the south by the City of Industry and unincorporated Los Angeles County, and to the west by the City of El Monte. The Project site is located at 1529 Virginia Avenue, Baldwin Park (APN 8558-032-018), abutting Interstate 10 (I-10) to the north; refer to Figure 2, Project Location, and Figure 3, Site Plan.

Regional access to the site is provided via the Harbor Freeway (Interstate [I] 110) to the north. Local access to the site is provided primarily from Virginia Avenue.

2.2 Existing Setting

EXISTING SITE USES
As shown on Figure 3: Site Plan , under existing conditions, an existing commercial/industrial building occupied by Industrial Powder Coatings is located within the Project site. A small asphalt-paved parking lot and storage area is located surrounding the commercial building. The north-central portion of the Project site, where the proposed billboard would be installed, is asphalt -paved. A grassy s trip of land separates the Project site from the I-10 freeway corridor.

GENERAL PLAN AND ZONING
The Project site is designated “Commercial/Industrial (CI)” by the City’s General Plan Land Use Map. The Project site is zoned “Industrial Commercial (I-C)”. The I-C zoning designation is intended to provide areas for the development of industrial parks, office complexes and light manufacturing businesses. (Baldwin Park, 20 20, § 153.050.010) No General Plan land use amendment or zoning change is proposed or required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 4

SURROUNDING LAND USES

As shown on Figure 3: Site Plan , the Project site is bounded on the north by the I -10 freeway and an associated high freeway sound wall ; on the south by Virginia Avenue, south of which is a s ingle-family residential neighborhood; on the west by an existing commercial/industrial building occupied by Industrial Powder Coatings; and on the east by an In-N-Out Company Store. Additional commercial uses are located to the south of the project site, including House of Lumber Plywood and Hardware.

2.3 Project Characteristics
The Project evaluated in this MND is proposed by Lamar of Los Angeles (the “Project Applicant”) and is referred to as “Virginia Avenue Digital Billboard Project.” The Project Applicant is proposing to install and operate an approximately 90-foot tall digital billboard, located at 1529 Virginia Avenue, on a developed industrial parcel within the City of Baldwin Park, adjacent to the I-10 freeway corridor.

As shown in Figures 2 and 3, the Project is located on a developed property that abuts the southern edge of the I-10 freeway, in the southeastern portion of the City of Baldwin Park. The proposed Project involves the construction of a dual -faced, digital/LED billboard with associated infrastructure connections. As shown on in Figure 3, Site Plan, the Project Applicant proposes to construct the billboard on the north - central portion of the triangle-shaped site. Project operation would include displaying of alternating LED advertisements on either of side of the billboard. The Project does not propose to alter the existing on- site commercial building (occupied by Industrial Powder Coatings). The operational characteristics of the Project are not expected to change the characteristics of the existing Project site in any way that could result in reasonably foreseeable environmental effects.

2.4 Project-Related Approvals

CALTRANS OUTDOOR ADVERTISING (ODA) DISPLAY PERMIT (CALTRANS) Pursuant to the Federal Highway Beautification Act (1965) and State Outdoor Advertising Act (2014), Caltrans is responsible for regulating the placement of outdoor advertising displays visible from California Highways and performing regular reviews of outd oor advertising displays located adjacent to freeways and highways identified on the National Highway System. The Project proposes to develop a digital, dual- faced billboard adjacent to the I -10 freeway; therefore, the Project would be subject to approval of an Outdoor Advertising (ODA) Display Permit by Caltrans. The ODA Display Permit would assure that certain location and design features of the Project would be met, including, but not limited to, the following:
• The billboard must be located outside the right-of-way of any highway; • There must be an existing business activity within 1,000 feet of the proposed billboard; The digital billboard must be 1,000 feet from any other digital billboard; • The digital billboard must be 500 feet from any other static billboard; and • The maximum display area is set at 25 feet in height by 60 feet in length. (Caltrans, 2021) The approval of the ODA Display Permit Application, in and of itself, would not lead to a physical change in the environment other than the fore seeable changes inherit of the construction and operation of the proposed billboard Project described in this document.

REQUESTED ENTITLEMENTS
The Project requests approval of the following entitlements:

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 5
• Development Agreement between the City and the Developer to install a digital billboard within the corridor of an interstate freeway (I-10 freeway);
• Building Permit (City of Baldwin Park);
• Approval of a development/design plan pursuant to the Outdoor Advertising Act (Caltrans) ^_

ORA N GE C OU NT Y
M o u n t a i n s
S a n F e r n a n d o
V a l l e y
P
a
c
i f i c
O
c
e
a
n
SA N

IBE RN A RD IN O

COU NT Y

L O S A N G E L E S C O U N T Y
SA N

BE RN A RD N O

COU NT Y
S a n t a M o n i c a

ORA N GE C OU NT Y

L O S A N G E L E S C O U N T Y
Santa
Monica
El Segundo
Manhattan
Beach
Hermosa Beach
Redondo
Beach
San Gabriel
Temple
City
San Marino
Bradbury
Azusa
Sierra
Madre
Arcadia
Glendora
Monrovia
Duarte
nta Clarita
Hawthorne Lynwood
South GateInglewood
Huntington Park
Vernon
West Hollywood Alhambra
Sa
Beverly Hills
Culver City
South
Pasadena
Burbank
La Canada
Flintridge
Glendale
San
Fernando
Pasadena
La Mirada
La Habra
Heights
Downey
Santa Fe
Springs
Commerce
Monterey
Park
Irwindale
Palos Verdes
Estates
Artesia
Signal
Hill
Lakewood
Long Beach
Carson
Bellflower
Paramount
Compton
Cerritos
Norwalk
Rancho
Palos Verdes
Whittier
Diamond Bar
La Puente
South El
Monte
West Covina
El Monte
Montebello
Rosemead
Industry
Baldwin Park
Pico
Rivera
San Dimas
Rolling
Hills
Lawndale
Gardena
Torrance
Los Angeles
Walnut
UV110UV2
UV19
UV107
UV2
UV142
UV261
UV133
UV22
UV90
UV66
UV91
UV71
UV30
UV39
UV57
UV90
UV72
UV22
UV710
UV55
UV210
UV72
UV72
UV57
UV42
UV47
UV1
UV1
UV1
UV90
UV42
UV19
UV1
UV90
UV39
UV2
UV14
UV118
UV170
UV73
UV60
UV91
UV55
UV91
UV241
UV134
UV213
UV60
UV2
£¤66
£¤101
§¨¦5
§¨¦405
§¨¦405
§¨¦710
§¨¦105
§¨¦10
§¨¦210
§¨¦10
§¨¦110
§¨¦405
§¨¦5
§¨¦105
§¨¦110
§¨¦710
§¨¦5
§¨¦10
§¨¦5
§¨¦110
§¨¦105
§¨¦5
§¨¦605
§¨¦605

SAN GABRIEL R

SANTAANA
R

LOS ANGELES R
R

OSANGELES
L

VIRGINIA AVENUE DIGITAL BILLBOARD PROJECT

BALDWIN PARK, CALIFORNIA
Figure 1. Project Regional Location
Legend
^_ Sign Location
County Boundary
Sources: CalAtlas; Los Angeles County. Map date: December 28, 2020.

S a n G a b r i e l M o u n t a i n s
0 52½
Miles
³
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 7
This page intentionally left blank.
^_
Francisquito Ave
Amar Rd
Puente Ave
NPuenteAve
Baldwin Park Blvd
Edanruth Ave
Robinette Ave
Tracy St
Whitesel St
Donaldale St
Mayland Ave
Waco St
Borgne Ave
Le
Big Dalton Ave
Judith St
Feather Ave
Ardila Ave
BarrydaleSt
Van Wig Ave
Ave
NSiesta
Stichman Ave
RathSt
NolandaleSt
Frazier St
Sauder St
N Stichman Ave Cagliero St
l
Maine Ave
Foster Ave
Vineland Ave
Dalewood St
Paddy Ln
Garvey Ave
Dr
N Ahern
Milbury Ave
Earl Ave
Corak St
Dancer St
Joycedale St
Via Rosa
Hamburger Ln
Durness St
N Feather Ave
Janetdale St
Remey Ave
Ragus St
Dilerdale St
Rexwood Ave
RockwayDr
N Big Dalton Ave
Ave
Blossom
Orange
Virginia Ave
§¨¦
10 l
l
l
§¨¦10
Sierra Vista
High School
Tracy
Elementary
School
Sierra Center
Shopping Mall
C i t y o f
I n d u s t r y
U n i n c o r p o r a t e d L o s A n g e l e s C o u n t y Van Wig
Elementary
School
Florence Flanner
Elementary School
Foster
Elementary
School
Jones Jr High School

VIRGINIA AVENUE DIGITAL BILLBOARD PROJECT

BALDWIN PARK, CALIFORNIA
Figure 2. Project Location
³
0 500250
Feet
Legend
^_ Sign Location
City of Baldwin Park
Other Incorporated Areas
B a l d w i n P a r k
Sources: Los Angeles County GIS; ArcGIS Online World Imagery Map Service; Google Maps.

Map date: December 28, 2020
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 9
This page intentionally left blank.

VIRGINIA AVENUE

DIGITAL BILLBOARD PROJECT

BALDWIN PARK, CALIFORNIA
Figure 3. Site Plan
³
0 2010
Feet
Legend
Project Parcel
Other Parcels
See Inset Map for Profile View
Inset Map
Source: CRC Enterprises; Los Angeles County GIS. Map date: December 28, 2020.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 11
This page intentionally left blank.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 12

3.0 ENVIRONMENTAL CHECKLIST FORM

BACKGROUND

1. Project Title: Virginia Avenue Digital Billboard

2. Lead Agency Name and Address:

City of Baldwin Park
Community Development Dept.
14403 East Pacific Avenue
Baldwin Park, CA 91706

3. Contact Person and Address:

Melissa Chipres
Associate Planner
City of Baldwin Park, City Planner
14403 East Pacific Avenue
Baldwin Park, CA 91706
Email: [email protected]

4. Project Location: 1529 Virginia Avenue, Baldwin Park, California

5. Project Sponsor’s Name and Address:

Lamar of Los Angeles
1121 S. Boyle Avenue Suite 201
Los Angeles, CA 90023

6. General Plan Designation: Commercial/Industrial (CI)

7. Zoning: Industrial Commercial (I-C)

8. Description of the Proposed Project: See Section 2.3.

9. Surrounding Land Uses and Setting: See Section 2.2.

10. Other public agencies whose approval is required: Caltrans for approval of a development/design plan pursuant to the Outdoor Advertising Act

11. Have California Native American tribes traditionally and culturally affiliated with the project area requested consultation pursuant to Public Resources Code section 21080.3.1? If so, is there a plan for consultation that includes, for example, the determination of significance of impacts to tribal cultural resources, procedures regarding confidentiality, etc.? At the time this Initial Study was made available for public review, one request for consultation ha s been received (by the Gabrieleno Band of Mission Indians – Kizh Nation). A tribal representative from the Gabrieleno Band of Mission Indians – Kizh Nation is anticipated to be present during some or all of the Project construction activities.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 13

ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this Project, involving at least one impact that is a “Potentially Significant Impact” or “Less Than Significant With Mitigation Incorporated” as indicated by the checklist on the following pages.

Aesthetics Agriculture and Forestry Resources Air Quality Biological Resources X Cultural Resources Energy
Geology and Soils Greenhouse Gas Emissions Hazards and Hazardous Materials
Hydrology and Water Quality Land Use and Planning Mineral Resources Noise Population and Housing Public Services
Recreation Transportation Tribal Cultural
Resources
Utilities and Service Systems Wildfire Mandatory Findings of Significance

DETERMINATION
On the basis of this initial evaluation:

I find that the proposed Project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.
_________________________________________________ _________________________ X
I find that although the proposed Project could have a significant effect on the environment, there will not be a significant effect in this case becau se revisions in the Project have been made by or agreed to by the Project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.

I find that the proposed Project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.

I find that the proposed Project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.

I find that although the proposed Project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed Project, nothing further is required.

CITY OF Baldwin Park
Date
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 14

EVALUATION OF ENVIRONMENTAL IMPACTS
The environmental analysis in this section is patterned after CEQA Guidelines Appendix G. An explanation is provided for all responses with the exception of “No Impact” responses, which are supported by the cited information sources. The responses consider the whole action involved, including on - and off-site project level and cumulative, indirect and direct, and short-term construction and long-term operational impacts. The evaluation of potential impacts also identifies the significance criteria or thresh old, if any, used to evaluate each impact question. If applicable, mitigation measures are identified to avoid or reduce the impact to less than significant. There are four possible responses to each question:
• Potentially Significant Impact . This response is appropriate when there is substantial evidence that an effect is significant. If there are one or more "Potentially Significant Impact" entries, upon completion of the Initial Study, an EIR is required.
• Less than Significant With Mitigation Incorporated. This response applies when the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less Than Significant Impact". The Lead Agency must describe the mitigation measures and briefly explain how they reduce the effect to a less than significant level. • Less than Significant Impact. A less than significant impact is one which is deemed to have little or no adverse effect on the environment. Mitigation measures are, therefore, not necessary, although they may be recommended to further reduce a minor impact. • No Impact. These issues were either identified as having no impact on the environment, or they are not relevant to the project.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 15

4.0 ENVIRONMENTAL ANALYSIS

4.1 Aesthetics
Except as provided in Public Resources Code
Section 21099, would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Have a substantial adverse effect on a
scenic vista? X
b. Substantially damage scenic resources,
including, but not limited to, trees, rock
outcroppings, and historic buildings within
a state scenic highway?
X
c. In non -urbanized areas, substantially
degrade the existing visual character or
quality of public views of the site and its
surroundings? (Public views are those that
are experienced from publicly accessible
vantage point). If the project is in an
urbanized area, would the project conflict
with applicable zoning and other
regulations governing scenic quality?
X
d. Create a new source of substantial light or
glare which would adversely affect day or
nighttime views in the area?
X
Existing Visual Setting
As depicted on Figure 3 , Site Plan , under existing conditions the Project site is fully developed. The southwest portion of the Project site is developed with an existing commercial building that is currently occupied by Industrial Powder Coatings . A small asphalt-paved parking lot and storage area is located surrounding the commercial building. The north-central portion of the Project site, where the proposed billboard would be installed, is asphalt -paved. A grassy strip of land and a high concrete wall separates the Project site from the I-10 freeway corridor . The proposed Project evaluated herein entails the construction of a dual-faced digital billboard on the north-central portion of the Project site.

Public views of the Project site are available primarily from motorists traveling along the I-10 freeway, and motorists and pedestrians traveling along Virginia Avenue. The visual character of the I-10 corridor in the vicinity of the Project site is established by views of commercial building frontages, c ement dividers located along the center and shoulder of the I -10, and large street trees. As shown on Figure 4, Visual Simulations, views of the southwest corner of the Project site experienced from the I-10 corridor consists of the frontage of the commercial building and nearby palm trees. Views of the Project site from Virginia Avenue include frontage views of the commercial building, asphalt parking lot, and vegetation .

Nonetheless, impacts to private views are not a subject of consideration in this MN D because the City does not have any ordinances or policies in place that protect views from privately-owned property.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 16
a) Have a substantial adverse effect on a scenic vista? Less than Significant Impact. The Project site is located in a low-lying, valley floor in the southern portion of the City. The City of Baldwin Park General Plan does not identify or discuss scenic vistas throughout the City; however, the nearest potential scenic vistas within the vicinity include views of the San Ga briel Mountains, approximately 6.3 miles to the north, and the Hacienda Hills, approximately 3.3 miles to the southwest. These distant landforms are prominently visible from the Project site’s vicinity on clear days but not under typical conditions due to atmospheric haze that is common throughout the region.

With mandatory compliance with the City of Baldwin Park Municipal Code requirements for billboard signage, Project-related development would not adversely affect views of the San Gabriel Mountains from nearby public viewing areas on clear days when the mountains are visible because the maximum height of the billboard would reach approximately 90 feet above ground and would not result in obstruction of, or substantially detract from, public views of the mountains along the horizon. Because public views of the San Gabriel Mountains would still be available from public viewing areas surrounding the Project site and the proposed digital billboard would be substantially lower in height ( 90 feet above existing grade), compared to the approximate 10,000-foot peak height of the mountain range, the Project would not have a substantial adverse effect on the public views of the surrounding mountains. Accordingly, the Project would result in a less-than-significant impact on the San Gabriel Mountains scenic vista. (USGS, 2004) Based on the foregoing analysis, the future development of a billboard on the north-central portion of the Project site would not have a substantial adverse effect on scenic vistas, and a less-than-significant impact would occur.
b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
No Impact. Implementation of the proposed Project would not damage scenic resources, including but not limited to, trees, rock outcroppings, and historic buildings within a State scenic highway. The Project site is not visible from a State scenic highway. Therefore, there is no potential for impacts to occur.

Under existing conditions, the entirety of the Project site is developed, and no trees or rock outcroppings are located within the northwestern portion of the Project site proposed to be developed with the digital billboard. Accordingly, the Project would not entail the damage or removal of any trees or rock outcroppings. Additionally, the Project has no potential to damage historic buildings, as none occur on the Project site under existing conditions. Caltrans does not officially designate any scenic highways within the City of Baldwin Park or within the vicinity of the Project site, including the segment of the I-10 freeway located to the immediate north of the Project site (Caltrans, 2011). Accordingly, the proposed Project has no potential to damage scenic resources within a State scenic highway and no impact would occur.
c) In non-urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 17
Less Than Significant Impact. The Project Applicant proposes to construct and operate a digital, dual - faced billboard on the north-central portion of the Project site. The Project site and the surrounding area is fully urbanized and developed with commercial and freeway -oriented land uses. The visual character of the I -10 corridor in the vicinity of the Project site is established by views of comm ercial building frontages, cement dividers located along the center and shoulder of the I -10, large street trees, various commercial signage posts, chain -link fencing, and lighting posts located along adjacent roadways and parking lots. Therefore, the installation and operation of a digital billboard on the site is conducive with the commercial nature of the Project area and environs located adjacent to the freeway corridor. The Project does not propose to alter the existing buildings and landscaping features on the Project site. City staff is required to review the proposed design of the billboard as part of the approval process, and design parameters will be imposed by the City based on Section 153.170 of the Zoning Code (Sign Regulations).

Thus, the Project would be consistent with the commercial character of the area, and would not result in the substantial degradation of the existing visual character or quality of the site and its surroundings.

Accordingly, a less-than-significant impact would occur. d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
Less Than Significant Impact. Under existing conditions, the Project site is developed with commercial land uses. Exterior lighting is present within neighboring commercial areas to the south, east, and west of the Project site. Lighting posts are located within roadways and parking lots adjacent to the I-10 corridor in the vicinity of the Project site. The proposed Project would res ult in an increase in ambient light generation via the projection of images on an LED interface that would be visible to motorists traveling on the I-10 freeway. Due to the height of the billboard (87 feet), all or a portion of the LED display also would be visible from nearby properties, including the residential neighborhoods nearby (see Appendix B for sign elevation).

Light measurements utilize foot -candles as a unit of lighting intensity, which is the amount of light produced by a single candle when measured from one foot away (for reference, a 100 -watt light bulb produces 137 foot -candles at one foot away) . According to the Project’s lighting study prepared by Daktronics (included herein as Technical Appendix A), and as shown on Figure 5 , Billboard Lighting Intensity, due to the lighting direction and intensity of the proposed billboard, residential areas within the vicinity of the Project site would experience a nearly undetectable increase in ambient light as a result of the operation of the proposed digital billboard. Ambient light levels within residential neighborhoods are more heavily impacted by porch lights and landscape lights than the lighting that would be produced by the proposed billboard.

Additionally, City of Baldwin Park Municipal Code § 153.170, regulates the operation of digital billboards with respect to illumination. As shown on Figure 5 , Billboard Lighting Intensity, the lighting study demonstrates that the illumination produced by the proposed billboard would not exceed 0.2 foot candles at 250 feet at any angle from its west -facing or east-facing sides. Furthermore, the billboard would be required to be equipped with a light sensing device that would automatically adjust the billboard’s brightness in order to meet the ligh t intensity requirement with respect to changes in ambient light conditions. Compliance with the aforementioned requirements and the requirements of § 153.170 of the City’s Municipal Code would ensure that the Project does not result in substantial light and/or glare impacts.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 18
Aesthetics: Mitigation Measures
Implementation of the proposed Project would result in less -than-significant impacts associated with aesthetics. Therefore, no mitigation measures are required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 19
This page intentionally left blank.

VIRGINIA AVENUE DIGITAL BILLBOARD PROJECT

BALDWIN PARK, CALIFORNIA
Figure 4. Visual Simulations
Map date: December 28, 2020.

Westbound at 90 Feet
Eastbound at 90 Feet
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 21
This page intentionally left blank.

VIRGINIA AVENUE DIGITAL BILLBOARD PROJECT

BALDWIN PARK, CALIFORNIA
Figure 5. Billboard Lighting Intensity
Source: Daktronics 12/9/2020. VALUES EXPRESSED ARE SPECIFIC TO DAKTRONIC PRODUCT ONLY. Map date: December 28, 2020. - Display at 3% Maximum Daytime Brightness
- Calculations take into account overall height of 87'
- Any rise or fall in elevation or physical blockage is not shown in calculations Legend
Project Parcel
Calculations are based on red, green, and blue LEDs (white content) powered to their maximum potential for nighttime viewing. Values are shown in footcandles (fc.) ³ 0 200100
Feet
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 23
This page intentionally left blank.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 24

4.2 Agriculture and Forestry Resources
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Convert Prime Farmland, Unique
Farmland, or Farmland of Statewide
Importance (Farmland), as shown on the
maps prepared pursuant to the Farmland
Mapping and Monitoring Program of the
California Resources Agency, to non -
agricultural use?
X
b. Conflict with existing zoning for
agricultural use, or a Williamson Act
contract?
X
c. Conflict with existing zoning for, or cause
rezoning of, forest land (as defined in Public
Resources Code section 1222(g)) or
timberland (as defined in Public Resources
Code section 4526)?
X
d. Result in the loss of forest land or
conversion of forest land to non-forest use?

X
e Involve other changes in the existing
environment which, due to their location or
nature, could result in conversion of
Farmland, to non -agricultural use or
conversion of forest land to non-forest use?
X
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use?
No Impact. The City of Baldwin Park is mostly built -out and does not contain any significant agricultural resources. According to mapping conducted by the CDC as part of the Farmland Mapping & Monitoring Program (FMMP), the Project site is identified as cont aining “Other Land.” The Project site and surrounding areas do not contain any soils mapped by the CDC as Prime Farmland, Farmland of Statewide Importance, Unique Farmland, or Farmland of Local Importance. (CDC, 2021) Accordingly, implementation of the proposed Project would not convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland) to non-agricultural use. Thus, no impact would occur and no mitigation is required. b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? No Impact . The Project site and areas to the south and west are zoned Industrial Commercial (I -C) Properties located to the north and east of the Project site are zoned as Freeway Commercial (F-C). There are no existing or proposed agricultural zoning designations affecting the Project site or surrounding area.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 25
As such, the Project has no potential to conflict with agricultural zoning designations, and no impact would occur.

According to information avai lable from the California Department of Conservation (CDC), there are no agricultural lands subject to a Williamson Act Contract within the City of Baldwin Park (CDC, 2021).

Accordingly, the proposed Project would not conflict with a Williamson Act contrac t. No impact would occur and no mitigation is required.
c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))? No Impact. The Project site and surrounding areas are developed with commercial and industrial uses under existing conditions. There are no forest resources on the Project site or within the vicinity of the Project site.

There are no lands within the City of Baldwin Park, including the Project site and properties surrounding the Project site, that are zoned for forest land, timberland, or timberland zoned Timberland Produc tion (Baldwin Park, 2002a, Fig. LU-6). Accordingly, the proposed Project has no potential to impact properties zoned for forest land, timberland, or timberland zoned Timberland Production. As such, no impact would occur and no mitigation is required.
d) Result in the loss of forest land or conversion of forest land to non-forest use? No Impact. The City of Baldwin Park, including the Project site and properties surrounding the Project site, does not contain any forest lands. Under existing conditions, the Project site is developed with commercial uses and contains only limited ornamental landsca ping. Accordingly, the proposed Project has no potential to result in the loss of forest land or the conversion of forest land to non-forest use. No impact would occur and no mitigation is required.
e) Involve other changes in the existing environment, which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
No Impact. As indicated in the analyses presented above under Thresholds a) through d), the Project site and surrounding areas do not contain any lands that are used for farmland or forest land. Accordingly, the proposed Project would not involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland to non -agricultural use or the conversion of forest land to non-forest use. Thus, no impact would occur and no mitigation is required.

Agriculture and Forestry Resources: Mitigation Measures The Project would result in no impact to agriculture and forestry resources. Therefore, no mitigation measures are required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 26

4.3 Air Quality
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Conflict with or obstruct implementation of
the applicable air quality plan? X
b. Result in a cumulatively considerable net
increase of any criteria pollutant for which
the project region is non -attainment under
an applicable federal or state ambient air
quality standard?
X
c. Expose sensitive receptors to substantial
pollutant concentrations? X
d. Result in other emissions (such as those
leading to odors) adversely affecting a
substantial number of people?
X
Criteria pollutants are pollutants that are regulated through the development of human health -based and/or environmentally-based criteria for setting permissible levels. Criteria pollutants include ozone (O3), nitrogen oxides (NOx), volatile organic compounds (VOCs), particulate matter less than 10 microns (PM10), particulate matter less than 2.5 microns (PM 2.5), sulfur dioxide (SO 2), carbon monoxide (CO), reactive organic gases (ROGs), and lead.

The Project site is located within the South Coast Air Basin (SCAB), a 6,745-square mile sub-region of the South Coast Air Quality Management District (SCAQMD). The SCAB is bound by the Pacific Ocean to the west; the San Gabriel, San Bernardino, and San Jacinto Mountains to the north and east, respectively; and the San Diego County line to the south.
a) Conflict with or obstruct implementation of the applicable air quality plan? No Impact. The SCAQMD has adopted a series of Air Quality Management Plans (AQMPs) to meet State and Federal ambient air quality standards. AQMPs ar e updated regularly in order to more effectively reduce emissions and accommodate growth. The most recent AQMP (2016) was adopted by the SCAQMD Governing Board. The SCAQMD established criteria for determining consistency with their AQMP, which are defined in Chapter 12, Sections 12.2 and 12.3 of the SCAQMD CEQA Air Quality Handbook and are discussed below.
• Consistency Criterion No. 1: A proposed project would not result in an increase in the frequency or severity of existing air quality violations, or cause or contribute to new violations, or delay the timely attainment of the AQMP’s air quality standards or the interim emissions reductions. • Consistency Criterion No. 2 : A proposed project would not exceed the AQMP’s assumptions or increments based on the years of the project build-out phase.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 27
Implementation of the proposed Project would entail the installation of a digital billboard, the construction and operation of which would not result in an increase in the frequency or severity of existing air quality violations, nor would it cause or contribute to new violations that would inhibit attainment of air quality standards specified in the AQMP.

Construction and installation are anticipated to occur over a 2-3 day period, and would not result in the generat ion of emissions that would exceed the SCAQMD’s adopted thresholds for construction emissions. Operation of the project would not result in any direct emissions of criteria pollutants, and the project would not generate additional vehicle trips or vehicle miles traveled. As such, the project would not result in mobile source emissions. Operation of the billboard would require a negligible amount of electricity to be used, but at an amount that would not generate notable emissions of criteria pollutants.

Additionally, the proposed Project would not affect any regional population, housing, and employment projections prepared for the City of Baldwin Park by SCAG, and therefore would not exceed the assumptions in the AQMP. As a result, the proposed Project would not conflict with, or obstruct the implementation of, the applicable air quality plan and no impacts would occur. b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard? Less Than Significant Impact. Air quality impacts/emissions associated with a project can be placed into two categories: temporary (short -term) or long -term emissions. Temporary (short-term) emissions are generally associated with the demolition, grading, and construction activities o f the project while long - term emissions are associated with the day-to-day operation, use, and area emissions from such activities as vehicle use, consumer product use, and energy generation/consumption.

The SCAB does not achieve the State of California standards for O 3, PM10, and PM 2.5, and also does not achieve federal standards for O 3 and PM2.5 (SCAQMD, 2013, Ch. 2). As a single sign project with minimal construction and operational-related emissions, the Project would result in a negligible level of emissions in comparison to SCAQMD’s regional thresholds of significance. Therefore, the Project would not result in a cumulatively considerable net increase in emissions. Accordingly, implementation of the Project would not substantially contribute to a net increase of any criteria pollutant for which the Project region is non- attainment or is considered an O 3 precursor; therefore, impacts would be less than significant and less than cumulatively considerable.
c) Expose sensitive receptors to substantial pollutant concentrations? Less Than Significant Impact . A “sensitive receptor” is a person in the population who is particularly susceptible to health effects due to exposure to an air contaminant than is the population at large.

Sensitive receptors and associated facilities that house them in proximity to local CO sources, toxic air contaminants, or odors are of particular concern in the evaluation of potential pollutant concentrations.

Sensitive receptors include children, the elderly, persons with pr eexisting respiratory or cardiovascular illness, and athletes and others who engage in frequent, heavy cardiovascular exercise. Sensitive receptors located nearest the Project site include the residences located to the southeast, southwest, and northeast of the Project site.

As described in Threshold b), above, Project -related construction and operation would not produce emissions above the SCAQMD’s regional thresholds of significance. In addition, due to the nature of the Project (proposed stationary digital billboard), its trip generation would be nominal at one two -way trip approximately six to eight times per year, for billboard maintenance. A maximum of one two-way trip Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 28

approximately six to eight times per year is not significant enough to result in a CO “hotspot” that could lead to an exceedance of the State’s CO standards.

Accordingly, no substantial pollutant concentrations
would result from the Project’s construction or operation and a less -than-significant impact to sensitive receptors would occur.
d) Result in other emissions (such as those leading to odors adversely affecting a substantial number of people?
Less Than Significant Impact . The proposed Project would involve the construction and operation of a digital billboard, which is not a land use typically associated with emitting objectionable odors. Potential temporary odor sources associated with the construction of the proposed Project may result from construction equipment exhaust and the application of asphalt (if necessary for Proje ct construction).

Construction-related odor emissions would be temporary, short -term, and intermittent in nature and would cease upon completion of the respective phases of construction. In addition, these types of odors are common in construction activities and are not considered to be offensive or objectionable to a large portion of the population. As such, odor emissions associated with construction activities is considered less than significant. The Project’s construction-generated refuse would be stored in covered containers and removed at regular intervals in compliance with the City’s solid waste regulations. The proposed Project would also be required to comply with SCAQMD Rule 402 to prevent occurrences of public nuisances related to odors. Therefore, odors associated with construction and operation of the Project would be less than significant and no mitigation is required.

Air Quality: Mitigation Measures
The proposed Project would result in less -than-significant impacts to air quality; accordingly, mitigation measures are not required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 29

4.4 Biological Resources
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Have a substantial adverse effect, either
directly or through habitat modifications,
on any species identified as a candidate,
sensitive, or special status species in local
or regional plans, policies, or regulations,
or by the California Department of Fish and
Game or U.S. Fish and Wildlife Service?
X
b. Have a substantial adverse effect on any
riparian habitat or other sensitive natural
community identified in local or regional
plans, policies, regulations or by the
California Department of Fish and Game or
U.S. Fish and Wildlife Service?
X
c. Have a substantial adverse effect on state
or federally protected wetlands (including,
but not limited to, marsh, vernal pool,
coastal, etc.) through direct removal, filling,
hydrological interruption, or other means?
X
d. Interfere substantially with the movement
of any native resident or migratory fish or
wildlife species or with established native
resident or migratory wildlife corridors, or
impede the use of native wildlife nursery
sites?
X
e. Conflict with any local policies or
ordinances protecting biological resources,
such as a tree preservation policy or
ordinance?
X
f. Conflict with the provisions of an adopted
Habitat Conservation Plan, Natural
Community Conservation Plan, or other
approved local, regional, or state habitat
conservation plan?
X
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 30
No Impact. Under existing conditions, the Project site is developed with an existing commercial building.

The proposed 10-foot by 10-foot disturbance area of on the northwestern portion of the Project site does not contain native habitat or sensitive plant species or vegetation that serve as habitat to sensitive animal species. Accordingly, no impacts to sensitive species would occur and no mitigation measures are necessary.
b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
No Impact. The Project site is developed with commercial land uses under existing conditions. The Project site does not contain riparian habitat or other sensitive natural communities identified in local or regional plans, policies, regulations, or by the CDFW or the USFWS. Accordingly, no impact to riparian habitat would occur.
c) Have a substantial adverse effect on state or federal ly protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
No Impact. The Project site is developed with commercial land uses and does not contain any wetlands.

Accordingly, the proposed Project would have no impact on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means. d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
No Impact. Under existing conditions, the Project site is developed with existing commercial building.

Under existing conditions, the Project site does not provide habitat for native species, is not part of a terrestrial wildlife movement corridor, and does not serve as a native wildlife nursery site. The Project does not entail the removal of any trees or other vegetation where nesting birds may be present.

Regardless, mandatory compliance with the federal Migratory Bird Treaty Act (MBTA) would preclude impacts to nesting birds in the unlikely event that nesting birds are present at the site during construction activities. Accordingly, implementation of the proposed Project would have no potential to interfere with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or with the use of native wildlife nursery sites. e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
No Impact. The Project site is developed with commercial uses under existing conditions. No vegetation would be removed during the Project’s construction or operation phases. Additionally, mandatory compliance with the federal MBTA would preclude impacts to nesting birds in the unlikely event that nesting birds are present at the site at the time of construction.

There are no other local policies or ordinances protecting biological resources that are applicable to the proposed Project; accordingly, no impact due to a conflict with any local policies or ordinances protecting biological resources would occur as a result of Project implementation.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 31
f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? No Impact. According to the CDFW, there are no Habitat Conservation Plans, Natural Community Conservation Plans, or other approved local, regional, or state habitat conservation plans applicable to the Project site (CDFW, 2019). Accordingly, the Project has no potential to conflict with any of the above and no impact would occur.

Biological Resources: Mitigation Measures
Implementation of the proposed Project would not result in no impact to biological resources; accordingly, mitigation measures are not required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 32

4.5 Cultural Resources
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Cause a substantial adverse change in the
significance of a historical resource
pursuant to § 15064.5?
X
b. Cause a substantial adverse change in the
significance of an archaeological resource
pursuant to § 15064.5?
X
c. Disturb any human remains, including
those interred outside of dedicated
cemeteries?
X
a) Cause a substantial adverse change in the significance of a historical resource pursuant to § 15064.5?
No Impact. None of the Project site’s existing features are included on the National Register of Historic Places, the California Register of Historical Resources, or the California Historic Resources Information System (NPS, 2019; OHP, 2021). Thus, because the existing structure on the Project site is not on federal, State, or local lists of designated historic resources and not eligible for listing, the building is not historically significant as defined by CEQA Guidelines §15064.5 and no impact to historical resources would occur. b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5?
Less Than Significant Impact with Mitigation Incorporated . There is a remote potential for archaeological resources to be unearthed during the Project’s ground -disturbing construction activities.

However, given the small proposed area of disturbance and the currently disturbed condition of the proposed 10-foot by 10 -foot area where subsurface disturba nce would occur, it is highly unlikely that resources, if unearthed, would be eligible for inclusion in the California Register of Historical Resources.

Although unlikely, if significant archaeological resources are unearthed during ground disturbance activities, a potentially significant impact would occur if the resource is not properly identified and appropriately treated. Thus, mitigation is required to ensure that potentially significant archaeological resources are properly identified and appropriately treated. With implementation of Mitigation Measure MM CR-1 and MM CR-2 (see below), the Project’s potential impact to archaeological resources would be reduced to levels that are less than significant.
c) Disturb any human remains, including those interred outside of dedicated cemeteries? No Impact. The Project site is not known to have ever been used as a cemetery. The possibility of uncovering human remains during Project -related grading activities is also remote due to fact that the previous deve lopment of the site has substantially disturbed the subsurface of the site. Pursuant to California Health and Safety Code Section 7050.5, in the unlikely event human remains are encountered during ground-disturbing activities, no further disturbance shall occur until the County Coroner has made Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 33
the necessary findings as to origin. Pursuant to California Public Resources Code Section 5097.98(b), remains shall be left in place and free from disturbance until a final decision as to the treatment and disposition has been made by the Coroner. If the Coroner determines the remains to be Native American, the California Native American Heritage Commission (NAHC) must be contacted and the NAHC must then immediately notify the “most likely descendant(s)” of receiv ing notification of the discovery. The most likely descendant(s) shall then make recommendations within 48 hours, and engage in consultations concerning the treatment of the remains as provided in Public Resources Code Section 5097.98.

Mandatory compliance with these requirements would ensure that potential impacts associated with the discovery of human remains would not occur.

Cultural Resources: Mitigation Measures
MM CR -1: Archaeological Monitoring . Prior to the issuance of a grading permit, the Project Applicant or construction contractor shall provide evidence to the City of Baldwin Park that the construction site supervisors and crew members involved with grading and trenching operations are trained to recognize archaeological resources, should such resources be unearthed during ground-disturbing construction activities. If a suspected archaeological resource is identified on the property, the construction supervisor shall be required by his contract to immediately halt subsurface ground-disturbing activities and seek identification and evaluation of the suspected resource by a professional archaeologist. This requirement shall be noted on all grading plans and the construction contractor shall be obligated to comply with the note. The archaeologist shall evaluate the suspected resource and make a determination of significance pursuant to California Public Resources Code Section 15064.5(a). If the resource is not a significant archaeological resource, further mitigation is not required. If the resource is significant, Mitigation Measure MM CR-2 shall apply.

MM CR -2: Addressing Significant Archaeological Resources . If a significant archaeological resource(s) is discovered, the archaeological monitor, the Project Applicant, and the City of Baldwin Park Community Development Department shall confer regarding mitigation of the discovered resource(s) pursuant to California Public Resources Code Section 21083.2. A treatment plan shall be prepared, approved by the City of Baldwin Park Community Development Department, and implemented by the archaeologist.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 34

4.6 Energy
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Result in potentially significant
environmental impact due to wasteful,
inefficient, or unnecessary consumption of
energy resources, during project
construction or operation?
X
b. Conflict with or obstruct a state or local
plan for renewable energy or energy
efficiency?
X
a) Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation? Less Than Significant Impact. The means to achieve the goal of conserving energy include decreasing overall energy consumption, decreasing reliance on natural gas and oil, and increasing reliance on renewable energy sources. In particular, the proposed Project would be considered “wasteful, inefficient, and unnece ssary” if it were to violate State and federal energy standards and/or result in significant adverse impacts related to project energy requirements, energy inefficiencies, energy intensiveness of materials, cause significant impacts on local and regional e nergy supplies or generate requirements for additional capacity, fail to comply with existing energy standards, otherwise result in significant adverse impacts on energy resources, or conflict or create an inconsistency with applicable plan, policy, or regulation.

The proposed Project would use a limited amount energy resources for the operation of the digital billboard (e.g., electricity), for on-road vehicle trips 6-8 times per year for maintenance (e.g. gasoline and diesel fuel) generated by the Project (both during project construction and operation), and from off-road construction activities associated with the Project (e.g. diesel fuel). Each of these activities would require the use of energy resources. The Project would be responsible for conserving energy, to the extent feasible, and would be required to comply with Statewide and local measures regarding energy conservation, such as Title 24 building efficiency standards.

The proposed Project would be in compliance with all applicable federal, State, and local regulations regulating energy usage. For example, Southern California Edison (SCE) is responsible for the mix of energy resources used to provide electricity for its customers, and it is in the process of implementing the Statewide Renewable Portfolio Standard (RPS) to increase the proportion of renewable energy (e.g. solar and wind) within its energy portfolio. SCE has achieved at least a 33 percent mix of renewable energy resources, and will be required to achieve a renewable mix of at least 50 percent by 2030. Other statewide measures, including those intended to improve the energy efficiency of the statewide passenger and heavy-duty truck vehicle fleet (e.g. the Pavley Bill and the Low Carbon Fuel Standard) are improving vehicle fuel economies, thereby conserving gasoline and diesel fuel. These energy savings would continue to accrue over time.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 35
As a result, the Project would not result in any significant adverse impacts related to Project energy requirements, energy use inefficiencies, and/or the energy intensiveness of materials by amount and fuel type for each stage of the Project including construction, operations, maintenance, and/or removal. Both SCE, the electricity provider to the site, and Southern California Gas, the natu ral gas provider to the site, maintain sufficient capacity to serve the proposed Project. The Project would be required to comply with all existing energy efficiency standards, and would not result in significant adverse impacts on energy resources. Therefore, the proposed Project would not result in a wasteful, inefficient, or unnecessary of energy resources during Project construction or operation. Impacts would be less than significant. b) Conflict with or obstruct a state or local plan for renewable energy or energy efficiency? Less Than Significant Impact. The Project is designed with LED displays, which would require 16 amps of operating power. This level of power demand is considered negligible. As such, the Project would not conflict with or obstruct a state or local plan for renewable energy or energy efficiency; impacts would be less than significant.

Energy: Mitigation Measures
Implementation of the proposed Project would result in less -than-significant impacts due to energy; therefore, mitigation measures would not be required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 36

4.7 Geology and Soils
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Directly or indirectly cause potential
substantial adverse effects, including the
risk of loss, injury, or death involving:
1) Rupture of a known earthquake fault, as
delineated on the most recent Alquist -
Priolo Earthquake Fault Zoning Map
issued by the State Geologist for the area
or based on other substantial evidence
of a known fault? Refer to Division of
Mines and Geology Special Publication

42. X
2) Strong seismic ground shaking? X
3) Seismic-related ground failure,
including liquefaction? X
4) Landslides? X
b. Result in substantial soil erosion or the loss
of topsoil? X
c. Be located on a geologic unit or soil that is
unstable, or that would become unstable as
a result of the project, and potentially result
in on-or off-site landslide, lateral spreading,
subsidence, liquefaction or collapse?
X
d. Be located on expansive soil, as defined in
Table 18-1-B of the Uniform Building Code
(1994), creating substantial direct or
indirect risks to life or property?
X
e. Have soils incapable of adequately
supporting the use of septic tanks or
alternative waste water disposal systems
where sewers are not available for the
disposal of waste water?
X
f. Directly or indirectly destroy a unique
paleontological resource or site or unique
geologic feature?
X
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 37
a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:

1) Rupture of a known earthquake fault, as delineated on the most recent Alquist -Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.

No Impact. There are no known faults on the Project site and the Project site is not located within an Alquist-Priolo earthquake fault zone (USGS, 2021). As such, there is no potential for ground rupture at the site.
2) Strong seismic ground shaking?
Less Than Significant Impact. Southern California is a seismically active area and properties in the City of Baldwin Park, including the Project site, a re subject to periodic ground shaking and other effects from earthquake activity along nearby and regional faults. Fault zones in the regional vicinity with the potential to cause moderate ground shaking in the City of Baldwin Park include the San Andreas Fault Zone, the Sierra Madre Fault Zone, the Newport-Inglewood Fault, the Norwalk Fault, and the Whittier Fault (USGS, 2021).

Similar to all other development projects within Southern California, the Project has the potential to expose people or struct ures to adverse effects associated with seismic events. The Project would be required to comply with the most current California Building Code (CBC), which requires the incorporation of special structural design standards to attenuate hazards associated w ith credible seismic ground shaking events that are anticipated in the Project area. Compliance with applicable requirements of the CBC would be assured through future City review of construction permits, which would require that strong seismic ground sha king effects are attenuated. As such, impacts would be less than significant and mitigation is not required.
3) Seismic-related ground failure, including liquefaction? Less Than Significant Impact. The Project site is located within a current mapped Calif ornia Liquefaction Hazard Zone (CDC, 1999). Liquefaction typically occurs in loose granular and cohesionless soils with shallow groundwater (within approximately 50 feet below ground surface [bgs]). During an earthquake, distortion of soil mass occurs and pore pressure increases resulting in a decrease in bearing capacity. After dissipation of the excess pore pressures, the saturated soils tend to settle. According to the City’s General Plan EIR, data provided by water service providers in Baldwin Park indicate that the depth to groundwater throughout the City is greater than 50 feet bgs; therefore, the potential for liquefaction hazard is low (Baldwin Park, 2002b, p. 89). Nonetheless, compliance with applicable requirements of the CBC would be assured t hrough future City review of construction permits, which would require that strong seismic ground shaking effects, that may lead to liquefaction are attenuated. As such, impacts would be less than significant and mitigation is not required.
4) Landslides?
No Impact. The Project site is not located within a current mapped California Earthquake -Induced Landslide Hazard Zone (CDC, 1999). Additionally, the Project site and surrounding area is generally flat and lacking of prominent topographical features. As such, no impacts related to landslide would occur and mitigation is not required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 38
b) Result in substantial soil erosion or the loss of topsoil? No Impact. Under existing conditions, the entirety of the Project site is developed and limited excavation would be required for installation of the billboard support column and associated utility connections.

Project excavation could remove some soil from the Project site; however, excavated soil would not remain on-site and would immediately be transported to the Puente Hills Landfill, located approximately

3.5 miles southwest of the Project site. Given the currently developed character of the Project site, the limited area of disturbance, and the fact that excavated soil would not be left on-site to erode, no impacts related to soil erosion or loss of topsoil would be anticipated. Additionally, the long-term operation of the Project as a digital billboard would not result in increased erosion effects and would not increase the volume or velocity o f water discharged from the site. Accordingly, no impacts related to soil erosion or loss of topsoil would occur and no mitigation is required. c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the pr oject, and potentially result in on -or off-site landslide, lateral spreading, subsidence, liquefaction or collapse?
Less Than Significant Impact. Potential landslide, lateral spreading, soil stability, and liquefaction hazards are addressed above under th e discussion and analysis of Thresholds a) and b). As discussed under Thresholds a) and b), with mandatory compliance with applicable requirements and standards of the CBC, impacts due to landslides and liquefaction would be less than significant and miti gation is not required.

Additionally, the entirety of the Project site is fully developed and the likelihood for the Project to be subject to unstable soils is low. The billboard column is proposed to be secured to a footing installed at a depth of approximately 42 feet bgs to ensure stability. Based on the foregoing analysis, and with mandatory compliance with the CBC requirements, the proposed Project would result in less -than- significant impacts due to unstable soil conditions that could result in on - or off-site landslides, lateral spreading, subsidence, liquefaction, and collapse.
d) Be located on expansive soil, as defined in Table 18 -1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? No Impact. The Project site is fully developed under existing conditions. Additionally, no new grading or significant excavation activities would not be required as part of the construction of the proposed billboard. The billboard column is proposed to be secured in an approximately 42-foot deep footing to ensure stability. Accordingly, the Project would not create a substantial risk to life or property associated with expansive soils, and no impact would occur.
e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water? No Impact. The proposed Project is a digital billboard, and would not utilize septic tanks or alternative wastewater disposal systems. Accordingly, no impact would occur. f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
Less Than Significant Impact. The Project site is not known to have ever contain unique paleontological resource or contain a unique geologic feature . As such, impacts would be less than significant and mitigation is not required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 39
Geology and Soils: Mitigation Measures
Implementation of the proposed Project would result in less-than-significant impacts due to geology and soils; therefore, mitigation measures would not be required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 40

4.8 Greenhouse Gas Emissions
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Generate greenhouse gas emissions, either
directly or indirectly, that may have a
significant impact on the environment?
X
b. Conflict with an applicable plan, policy or
regulation adopted for the purpose of
reducing the emissions of greenhouse
gases?
X
Existing Setting
Various gases in the Earth’s atmosphere, classified as atmospheric greenhouse gases (GHGs), play a critical role in determining the Earth’s surface temperature. Solar radiation enters Earth’s atmosphere from space, and a portion of the radiation is absorbed by the Earth’s surface. The Earth emits this radiation back toward space, but the properties of the radiation change from high -frequency solar radiation to lower-frequency infrared radiation.

Naturally occurring GHGs include water vapor (H 2O), carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), and ozone (O 3). Several classes of halogenated substances that contain fluorine, chlorine, or bromine are also GHGs, but they are, for the most part, solely a product of industrial activities. Although the direct GHGs, including CO 2, CH4, and N 2O, occur naturally in the atmosphere, human activities have changed their atmospheric concentrations. From the pre-industrial era (i.e., ending about 1750) to 2011, concentrations of these three GHGs have increased globally by 40, 150, and 20 percent, respectively (IPCC, 2013).

Greenhouse gases, which are transparent to solar radiation, are effective in absorbing infrared radiation.

As a result, this radiation that otherwise would have escaped back into space is now retained, resulting in a warming of the atmosphere. This phenomenon is known as the greenhouse effect. Among the prominent GHGs contributing to the greenhouse effect are carbon diox ide (CO2), methane (CH 4), ozone (O3), water vapor, nitrous oxide (N2O), and chlorofluorocarbons (CFCs).

Emissions of GHGs contributing to global climate change are attributable in large part to human activities associated with the industrial/manufacturing, utility, transportation, residential, and agricultural sectors.

In California, the transportation sector is the largest emitter of GHGs, followed by the industrial sector (California Energy Commission, 2020).

As the name implies, global climate change is a global problem. GHGs are global pollutants, unlike criteria air pollutants and toxic air contaminants, which are pollutants of regional and local concern, respectively.

California produced 424 million gross metric tons of carbon dioxide equivalents (MMTCO 2e) in 2019 (California Energy Commission, 2019). Given that the U.S. EPA estimates that worldwide emissions from human activities totaled nearly 46 billion gross metric tons of carbon dioxide equivalents (BMTCO 2e) in 2010, California’s incremental contribution to global GHGs is approximately 2% (U.S. EPA, 2014).

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 41
Carbon dioxide equivalents are a measurement used to account for the fact that different GHGs have different potential to retain infrared radiation in the atmosphere and contribute to the greenhouse effect.

This potential, known as the global warming potential of a GHG, is also dependent on the lifetime, or persistence, of the gas molecule in the atmosphere. Expressing GHG emissions in carbon dioxide equivalents takes the contribution of all GHG emissions to the greenhouse effect and converts them to a single unit equivalent to the effect that would occur if only CO2 were being emitted.

Consumption of fossil fuels in the transportation sector was the single largest source of California’s GHG emissions in 2014, accounting for 41% of total GHG emissions in the state. This category was followed by the industrial sector (24%), the electricity generation sector (including both in -state and out of -state sources) (15%) and the agriculture sector (8%) (California Energy Commission, 2016).

Determination of Significance Thresholds
In 2012, SCAQMD released a draft guidance for greenhouse gas emission thresholds for residential and commercial projects, which presents the following thresh olds for evaluating GHG emissions from such projects:
• Tier 1: If the project is exempt under existing statutory or categorical exemptions there is a presumption of “less-than-significant” impacts with respect to climate change. • Tier 2: If the project’s GHG emissions are within the GHG budgets in an approved regional plan (plans consistent with CEQA sections 15064(h)(3), 15125(d), or 15152(s)), there is a presumption of “less-than-significant” impacts with respect to climate change. • Tier 3: Consists of screening values at the discretion of the lead agency; however, they should be consistent for all projects within its jurisdiction. Project-related construction emissions should be amortized over 30 years and should be added back the project’s operation al emissions. The following thresholds are proposed for consideration:
o 3,000 metric tons of carbon dioxide equivalent (MTCO2e) per year for all land use types; or
o 3,500 MTCO2e per year for residential; 1,400 MTCO2e per year for commercial; or 3,000 MTCO2e per year for mixed-use projects.
• Tier 4: Does the project meet one of the following performance standards? If yes, there is a presumption of “less-than-significant” impacts with respect to climate change. o Option 1: Reduce emissions from business as usual by a certain percentage (currently undefined);
o Option 2: Early implementation of applicable AB 32 Scoping Plan measures; or o Option 3: A project-level efficiency target of 4.8 MTCO2e per service population as a 2020 target and 3.0 MTCO2e per service population as a 2035 target. The recommended plan- level target for 2020 is 6.6 MTCO2e and the plan level target for 2035 is 4.1 MTCO2e. • Tier 5: Involves mitigation offsets to achieve target significance thresholds.

According to the SCAQMD’s proposed GHG screening threshold for stationary source emissions described in the SCAQMD’s Interim CEQA GHG Significance Threshold for Stationary Sources, Rules and Plans (“SCAQMD Interim GHG Threshold”), a screening threshold of 3,000 MTCO2e per year to determine if additional analysis is required as an acceptable approach for small non -industrial projects. The City of Baldwin Park has not adopted its own numeric threshold of significance for determining impacts with respect to GHG emissions. Therefore, for purposes of analysis herein, the proposed Project may have a Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 42

significant adverse impact on GHG emissions if it would generate GHG emissions that exceed the SCAQMD’s proposed 3,000 MTCO2e per year screening threshold for all land use types (Tier 3). a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?

Less Than Significant Impact. Operational activities associated with the proposed Project would result in emissions of CO 2, CH 4, and N 2O strictly from energy source emissions from the Project’s electricity demand and mobile source emissions as a result of billboard maintenance visits (six to eight times per year). Additionally, construction activities would be minor and last approximately one week. Therefore, Project-related construction and operation would produce a negligible amount of emissions in comparison the SCAQMD’s interim threshold of 3,000 MTCO2e per year. Therefore, the proposed Project would result in a less-than-significant impact to GHG emissions, and mitigation is not required. b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
No Impact. As discussed in Threshold a) above, the Project would not generate GHG emissions above the SCAQMD draft screening level threshold of 3,000 MTCO 2e per year that is utilized to evaluate the significance of a small non-industrial project’s GHG emissions.

Additionally, activities associated with the Project would be subject to all applicable federal, state, and regional requirements adopted for the purpose of reducing GHG emissions, including, but not limited to:

CBSC Title 24 Energy Standards (also known as CalGreen); California Assembly Bill (AB) 1493 ; Executive Orders S-3-05 and B-30-15; AB 32; Senate Bill (SB) 1368; SB 97; SB 32 (2016); and the applicable policies of the City’s General Plan that reduce GHG emissions. There are no other plans, policies, or regulations adopted for the purpose of reducing GHG emissions that are applicable to the Project area; therefore, the Project would have no potential to conflict with such plans, policies, or regulations. The Project would also not generate an impact with respect to Threshold b), and no mitigation is necessary.

Greenhouse Gas Emissions: Mitigation Measures
Implementation of the proposed Project would result in less -than-significant impacts due to GHG emissions; therefore, mitigation measures would not be required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 43

4.9 Hazards and Hazardous Materials
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Create a significant hazard to the public or
the environment through the routine
transport, use, or disposal of hazardous
materials?
X
b. Create a significant hazard to the public or
the environment through reasonably
foreseeable upset and accident conditions
involving the release of hazardous
materials into the environment?
X
c. Emit hazardous emissions or handle
hazardous or acutely hazardous materials,
substances, or waste within one -quarter
mile of an existing or proposed school?
X
d. Be located on a site which is included on a
list of hazardous materials sites compiled
pursuant to Government Code Section
65962.5 and, as a result, would it create a
significant hazard to the public or the
environment?
X
e. For a project located within an airport land
use plan or, where such a plan has not been
adopted, within two miles of a public
airport or public use airport, would the
project result in a safety hazard or
excessive noise for people residing or
working in the project area?
X
f. Impair implementation of or physically
interfere with an adopted emergency
response plan or emergency evacuation
plan?
X
g. Expose people or structures, either directly
or indirectly, to a significant risk of loss,
injury or death involving wildland fires?
X
a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 44
b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials in to the environment?

d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
Less Than Significant Impact. Implementation of the proposed Project would result in the construction and operation of a digital billboard. While construction of the proposed billboard would disturb soil, there are no known hazardous materials at the Project site and no hazardous materials would be emitted during operation of the billboard. Heavy equipment would be used during construction of the proposed Project, which would be fueled and maintained by substances such as oil, diesel fuel, gasoline, hydraulic fluid, and other liquid materials that would be considered hazardous if improperly stored or handled. Improper use, storage, or transportation of hazardous materials could result in accidental releases or spills, potentially posing health risks to workers, the public, and the environment. This is a standard risk on all construction sites, and there would be no greater risk for improper handling, transportation, or spills associated with the proposed Project than would occur on any other similar construction site, and such impacts would be less than significant. Project maintenance may require the removal and replacement of defective LED enclosures, thereby resulting in waste from the disposal of the LED unit. However, LED bulbs are not considered toxic or hazard ous and are disposed of in regular landfills. Moreover, implementation and compliance with the City of Baldwin Park Municipal Code § 153.140.030, Hazardous Materials and Waste, would further ensure that any potential impacts would be less than significant (Baldwin Park, 20 20, § 153.140.030). There are no other components of the Project’s proposed construction or operation characteristics that have the potential to create a significant hazard to the public or the environment through routine transport, use, or disposal of hazardous materials. Accordingly, a less-than-significant impact would occur and no mitigation would be required. c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? No Impact. The Project site is not located within one-quarter mile of an existing or proposed school. The nearest school to the Project site is Tracy Elementary School located approximately 0.51 miles northwest of the P roject site. Accordingly, the proposed Project has no potential to emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one -quarter mile of an existing or proposed school. No impact would occur and no mitigation is required. e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? No Impact. The nearest airport to the Project site is the San Gabriel Valley Airport which is located approximately 3.4 miles northwest of the Project site. According to the Los Angeles County Airport Land Use Commission (ALUC), the Project site is not located withi n the influence area of any known airport within the County of Los Angeles (ALUC, 2012). Accordingly, no airport safety impacts would occur and no mitigation is required.
f) Impair implementation of or physically interfere with an adopted emergency resp onse plan or emergency evacuation plan?
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 45
No Impact. Due to the inherent, small-scale nature and location of the proposed billboard on the north- central portion of the developed Project site, the Project would not physically interfere with an adopted emergency response plan or emergency evacuation plan. Additionally, all construction activities would occur on-site, and no roadway closures would be required. No impact would occur and mitigation is not required.
g) Expose people or structures, either directl y or indirectly, to a significant risk of loss, injury or death involving wildland fires?
No Impact. The City’s General Plan states that because Baldwin Park is an urbanized community, structural fires rather than wildland fires represent the greatest fir e risk throughout the City (Baldwin Park, 2002a, p. PS -9). The Project site is located within and is surrounded by urban built-up land.

Accordingly, the proposed Project would not expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands. No impact would occur and no mitigation is required.

Hazards and Hazardous Materials: Mitigation Measures
Implementation of the proposed Project would result in less -than-significant impacts associated with hazards and hazardous materials; therefore, mitigation measures would not be required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 46

4.10 Hydrology and Water Quality
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Violate any water quality standards or
waste discharge requirements or
otherwise substantially degrade surface or
ground water quality?
X
b. Substantially decrease groundwater
supplies or interfere substantially with
groundwater recharge such that the project
may impede sustainable groundwater
management of the basin?
X
c. Substantially alter the existing drainage
pattern of the site or area, including
through the alteration of the course of a
stream or river or through the addition of
impervious surfaces, in a manner which
would:

X
1) Result in substantial erosion or siltation
on- or off-site? X
2) Substantially increase the rate or
amount of surface runoff in a manner
which would result in flooding on - or
offsite?
X
3) Create or contribute runoff water which
would exceed the capacity of existing or
planned stormwater drainage systems
or provide substantial additional
sources of polluted runoff?
X
4) Impede or redirect flood flows? X
d) In flood hazard, tsunami, or seiche zones,
risk release of pollutants due to project
inundation?
X
e) Conflict with or obstruct implementation of
a water quality control plan or sustainable
groundwater management plan?
X
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 47
a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality?

Less Than Significant Impact. Construction of the proposed Project would involve the drilling of a n approximately 42-foot deep, 5-foot wide borehole and the installation of materials associated with the billboard’s support infrastructure. These activities could potentially result in the generation of water quality pollutants such as silt, debris, chemicals, and other solvents with the potential to adversely affect water quality. Project excavation would remove soil from the north-central portion of the Project sit e; however, excavated soil would not remain on-site and would immediately be transported to the Puente Hills Landfill, located 3.5 miles southwest of the Project site. Given the Project’s minimal impact area and the fact that excavated soil would immediately be transported off -site, no substantial physical features associated with the construction of a digital billboard would lead to erosion or substantial contribution of polluted storm water runoff that would result in violation of any water quality standards or waste discharge requirements.

Additionally, because the area is already paved under existing conditions, the long-term operation of the digital billboard would not substantially increase the quantity or rate of storm water runoff nor would it substantially increase pollutant concentrations in storm water runoff from the site. Additionally, the Project would not produce wast ewater discharge. Therefore, water quality impacts associated with construction and operation activities would be less than significant and no mitigation measures would be required.
b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin? No Impact. No groundwater wells are located on the Project site. Additionally, the Project does not propose the installation of any wells. Therefore, implementation of the proposed Project would not deplete groundwater supplies associated with water well withdraw.

According to the City’s General Plan EIR, the depth to groundwater throughout the City is greater than 50 feet below ground surface (bgs) (Baldwin Park, 2002b, p. 89). The excavation required for utility connections and billboard support infrastructure would not extend greater than 50 feet bgs; therefore, groundwater is not anticipated to be encountered during construction of the Proj ect. Under current conditions, the portion of the Project site where the billboard would be constructed is developed and capped with asphalt; accordingly, the Project would not alter the site in a manner that would interfere with groundwater recharge. In addition, the installation of the billboard would not involve any water consumption and no net change in area -wide water consumption would occur as a result of Project implementation. Accordingly, no impacts would occur with respect to depletion of groundwater supplies or interference with groundwater recharge.
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
1) Result in substantial erosion or siltation on- or off-site? 2) Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or offsite?
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 48
3) Create or contribute runoff water which would exc eed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff?
4) Impede or redirect flood flows?
Less Than Significant Impact. The Project site is generally flat . With implementation of the Project, the site’s existing hydrological characteristics would not be substantially altered. Under the proposed conditions, runoff within the Project site would continue to drain to the southeast to the storm drain inlets within Virginia Avenue and would not be altered by the installation or operation of a billboard in the north- central portion of the Project site. Furthermore, no streams or rivers are located on-site, and thus would not be altered as a result of Project implementation. Therefore, with installation of the proposed billboard, there would be no significant alteration of the site’s existing drainage pattern and there would not be any significant increases in the rates of erosion or siltation or substantial increases in the rate or amount of surface runoff in a manner which would result in flooding on - or off-site. Impacts would be less than significant and no mitigation would be required. d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation? Less Than Significant Impact. According to the Federal Emergency Management Agency, Flood Insurance Rate Map, the Project site is located within an area of minimal flood hazard.1 Tsunamis are sea waves that are generated in response to large-magnitude earthquakes, which can result in coastal flooding. Seiches are the oscillation of large bodies of standing water, such as lakes, that can occur in response to ground shaking. The Project site is approximately 7 miles inland of the Pacific Ocean and there are no large bodies of standing water near the Project site. As a result, tsunamis and seiches do not pose hazards due to the Project site’s inland location and lack of nearby bodies of standing water. The Project site is not located within a flood hazard, tsunami or seiche zones potentially resulting in a release of pollutants due to Project Inundation; impacts would be less than significant.
e) Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
No Impact. No groundwater wells are located on the Project site. Additionally, the Project does not propose the installation of any wells. Therefore, implementation of the proposed Project would not conflict with or obstruct implementatio n of a water quality control plan or sustainable groundwater management plan.

Hydrology and Water Quality: Mitigation Measures
Implementation of the proposed Project would result in less -than-significant impacts due to hydrology and water quality considerations; accordingly, mitigation measures are not required. 1 Federal Emergency Management Agency, Flood Insurance Rate Map 06037C1795F, effective September 26, 2008, https://msc.fema.gov/portal/home, accessed August 24, 2020.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 49

4.11 Land Use and Planning
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Physically divide an established
community? X
b. Cause a significant environmental impact
due to a conflict with any land use plan,
policy, or regulation adopted for the
purpose of avoiding or mitigating an
environmental effect?
X
a) Physically divide an established community?
No Impact. The I-10 freeway traverses the City of Baldwin Park, and abuts the Project site to the north.

The Project site is located within an area dominated by freeway-oriented commercial land uses that abut the south side of the I-10 freeway where billboard structures are typical. Due to the small-scale nature of the Project ( an approximately 87 -foot tall dual -faced digital billboard on an already developed site), it would not have the potential to physically divide an established community. Accordingly, no impacts would result from the Project’s implementation with respect to the division of an established community. b) Cause a significant environmental impact due to a conflict with any land use plan, policy , or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Less Than Significant Impact. The land use plans, policies, and regulations applicable to the proposed Project include the City’s General Plan and the City’s Zoning Code/Municipal Code. Each of these plans, policies, and regulations is discussed below.

Analysis of Consistency with the City of Baldwin Park General Plan The City’s General Plan designates the Project site as “Commercial/Industrial (CI)” (Baldwin Park, 2002a, Fig. LU-6). The installation of a digital billboard adjacent to the I-10 freeway is a land use that is a typically seen within commercial areas adjacent to freeways and would not conflict with future or existing large scale commercial development. Accordingly, the Project would be consistent with the City’s General Plan and would not require an amendment to the City’s General Plan.

Analysis of Consistency with the City of Baldwin Park Zoning Code/Municipal Code Under existing conditions, the Proj ect site is zoned “Industrial Commercial (I -C)”. The I -C zoning designation is intended to provide areas for the development of industrial parks, office complexes and light manufacturing businesses. (Baldwin Park, 2020, § 153.050.010) No General Plan land use amendment or zoning change is proposed. The installation of a digital billboard within the I-10 corridor is a land use that would be freeway-oriented and would not conflict with future or existing industrial parks, office complexes and light manufacturing businesses.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 50
In addition, the proposed Project would be required to comply with the variety of lighting, structural, and legal provisions required by Municipal Code § 153.170, all of which would be enforced as conditions of the Project’s required Development Agreement or through future City review of implementing development permit applications (grading permits, building permits, etc.).

Therefore, the Project would not cause adverse environmental effects and be consistent with or otherwise would not conflict with all applicable provisions of the City’s Zoning Code and Municipal Code and would not require a change of zoning designation or any additional zone code amendments.

Accordingly, the proposed Project would not conflict with the City of Baldwin Park Municipal Code or the City’s General Plan goals and policies, and impacts would be less than significant.

Land Use and Planning: Mitigation Measures
Implementation of the proposed Project would result in less-than-significant impacts due to land use and planning considerations; accordingly, mitigation measures are not required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 51

4.12 Mineral Resources
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Result in the loss of availability of a known
mineral resource that would be of value to
the region and the residents of the state?
X
b. Result in the loss of availability of a locally-
important mineral resource recovery site
delineated on a local general plan, specific
plan or other land use plan?
X

a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
b) Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? No Impact. Under existing conditions, the Project site is developed with commercial/industrial uses. No mines, wells, or other resource extraction activity occurs on the property or is known to have ever occurred on the property. The City’s General Plan EIR identifies the Project site as being located within “Mineral Resource Zone 2 (MRZ-2),” which is defined as an area where there is little or no likelihood for presence of significant mineral resources (Baldwin Park, 2002b, Figure 11). Additionally, the proposed Project site is not identified as a locally -important mineral resource recovery site delineated on a local general, specific plan, or other land use plan. Accordingly, no impact would occur.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 52

4.13 Noise
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Generation of a substantial temporary or
permanent increase in ambient noise levels
in the vicinity of the project in excess of
standards established in the local general
plan or noise ordinance, or applicable
standards of other agencies?
X
b. Generation of excessive groundborne
vibration or groundborne noise levels? X
c. For a project located within the vicinity of a
private airstrip or an airport land use plan
or, where such a plan has not been adopted,
within two miles of a public airport or
public use airport, would the project
expose people residing or working in the
project area to excessive noise levels?
X
Existing Noise Conditions
Existing Study Area Ambient Noise Conditions
The Project site occurs in an urbanized portion of the City of Baldwin Park. Accordingly, the background ambient noise levels within the vicinity of the Project site are dominated by transportation‐related noise associated with the surrounding roadway network, which includes noise from automobile and light/heavy truck activities along the I-10 freeway.

Existing Groundborne Vibration
Based on the operational characteristics of the commercial uses on the site under current conditions, there are no sources of substantial groundborne vibration generated on the Project site. With the exception of groundborne vibration generated by roadway vehicle traffic along the 1 -10 freeway and adjacent roadways, no sources of substantial groundborne vibration occur in the Project site’s vicinity.

Airport Noise and Vibration
The nearest airport to the Project is the San Gabriel Valley Airport which is located approximately 3.4 miles northwest of th e Project site. According to the Los Angeles County ALUC, the Project site is not located within the influence area of any airport within the County of Los Angeles (ALUC, 2021).

Accordingly, noise or vibration issues from airports would not occur.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 53
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?

Less Than Significant Impact.

Construction-Related Noise Impacts
According to the City of Baldwin Park Municipal Code, construction activities are limited to the hours of 7:00 a.m. to 7:00 p.m. on Mondays to Fridays . No numerical noise threshold is established by the City’s Municipal Code pertaining to construction noise. Therefore, the Project’s mandatory compliance with the permitted construction hours established by the City’s Municipal Code would ensure that noise generated by the construction of the Project would not exceed applicable standards. Less-than-significant impacts would occur with respect to noise generated from construction of the Project, and mitigation is not required.

Operation-Related Noise Impacts
Regarding Project-related operational activities , noise level standards applicable to the Project include those provided in the Noise Element of the City of Baldwin Park General Plan and the Baldwin Park Municipal Code, as described below.

City of Baldwin Park General Plan Noise Element
The City of Baldwin Park General Plan Noise Element identifies noise-sensitive land uses and noise sources, and defines areas of noise impact for the purpose of developing policies to ensure that Baldwin Park residents are protected from excessive noise intrusion (Baldwi n Park, 2002b, pp. 65 -72). Sensitive land uses are generally defined as locations where people reside or where the presence of noise could adversely affect the use of the land. Sensitive land uses include but are not limited to uses such as schools, hospitals, residences, libraries, and recreation areas. Sensitive receptors located nearest the Project site include the residences located to the southeast of the Project site. According to the City’s General Plan EIR, noise‐sensitive land uses, such as res idential, are clearly compatible with exterior noise levels at or below 65 dBA CNEL (Baldwin Park, 2002b, Table 13). Operation of the Project is not anticipated to emit any audible noise except for very minor noise from periodic maintenance activity that w ould be overshadowed by vehicular noise on adjacent I-10 freeway. Accordingly, the Project would result in less- than-significant impacts with respect to the noise standards established by the City of Baldwin Park General Plan Noise Element.

City of Baldwin Park Municipal Code
The City of Baldwin Park Municipal Code § 153.140.070, Noise, establishes noise limits that apply to all zones within the City. Table 6-5, Municipal Code Noise Standards, provides base exterior noise standards applicable to the Project site and properties surrounding the Project site.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 54
Table 6-5
Municipal Code Noise Standards
Land Use Time Period Base Exterior Noise Level
Standards (dBA)
Residential
Daytime: 7:00 a.m. to 7:00 p.m. 55
Evening: 7:00 p.m. to 10:00 p.m. 50
Nighttime: 10:00 p.m. to 7:00 a.m. 45
Commercial Daytime: 7:00 a.m. to 10:00 p.m. 65
Nighttime: 10:00 p.m. to 7:00 a.m. 55

Industrial

Anytime 65
Source: (Baldwin Park, 2016, Section 153.140.070)
The operational activities associated with the proposed digital billboard would not emit any audible noise except for very minor noise from periodic maintenance activity that would be overshadowed by vehicular noise on the adjacent I -10 freeway. The operat ional activities associated with the proposed digital billboard would not be anticipated to generate any substantial increases in noise levels to the area that would result in exceedance of the base exterior noise level standards shown in Table 6-5. Accordingly, the Project would result in less-than-significant impacts with respect to Municipal Code standards applicable to operational noise, and no mitigation is required.

The only potential sources of substantial temporary or periodic increases in noise levels are temporary and intermittent noise associated with the Project’s construction activities via the operation of heavy equipment. Construction activity would be restricted to the permissible daytime hours permitted by the City’s Municipal Code (7:00 a.m. to 7:00 p.m. on Mondays to Fridays) over the course of the Project’s construction schedule (less than a week). Compliance with the City’s Municipal Code noise standards would ensure that Project construction activities would be less than significant, and mitigation would not be required. Further, construction noise would likely be overshadowed by vehicular noise levels from the adjacent I -10 freeway. Operation of the proposed digital billboard would not generate substantial temporary or periodic increases in ambient noise levels in the Project vicinity.

Based on the foregoing analysis, the Project would not result in the exposure of persons to or generation of noise levels in excess of standards established in the City’s General Plan or the Municipa l Code noise ordinance, or the applicable standards of other agencies. As such, impacts would be less than significant with respect to Threshold a), and mitigation is not required. b) Generation of excessive groundborne vibration or groundborne noise levels? Less Than Significant Impact. Groundborne vibration is an oscillatory motion which can be described in terms of displacement, velocity, or acceleration. It is expected that groundborne vibration from Project construction activities would cause intermittent, localized intrusion through the operation of heavy construction equipment and trucks. Any exposure of nearby sensitive receivers to nominal vibration would be temporary and only occur during permissible construction hours as permitted by the City’s Municipal Code. Truck vibration levels are dependent on vehicle characteristics, load, speed, and pavement conditions. Additionally, truck deliveries (if necessary) to the site may increase vibration levels in the area; however, truck deliveries would only occur during permissible construction hours as permitted by the City’s Municipal Code and would be indiscernible from vehicular movement on the adjacent I -10 freeway. There would be no sources of perceptible vibration associated with Project’s operation. Based Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 55
on the foregoing analysis, vibration levels associated with the Project are considered less than significant, and no mitigation is necessary.
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopt ed, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
No Impact . The nearest airport to the Project is the San Gabriel Valley Airport which is loc ated approximately 3.4 miles northwest of the Project site. According to the Los Angeles County ALUC, the Project site is not located within the influence area of any airport within the County of Los Angeles (ALUC, 2012). Accordingly, the Project would no t expose people residing or working in the Project area to excessive noise levels in relation to airports.

There are no private airstrips within the Project vicinity. Accordingly, the proposed Project would not expose people residing or working in the Pr oject area to excessive noise levels. No impact would occur and no mitigation is required.

Noise: Mitigation Measures
Implementation of the proposed Project would result in less -than-significant impacts to noise; accordingly, mitigation measures are not required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 56

4.14 Population and Housing
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Induce substantial unplanned population
growth in an area, either directly (for
example, by proposing new homes and
businesses) or indirectly (for example,
through extension of roads or other
infrastructure)?
X
b. Displace substantial numbers of existing
people or housing, necessitating the
construction of replacement housing
elsewhere?
X
a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
No Impact. The proposed Project would contribute the additional development of a digital billboard to the north-central portion of the Project site. Digital billboards are typical of and complementary to commercial freeway uses and have no potential to induce substantial population growth in the area, either directly or indirectly. Electric utility improvements required by the Project would solely serve the digital billboard’s energy demand and would not directly or indirectly induce population growth to the area. No impact would occur and no mitigation is required. b) Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
No Impact. Under existing conditions, the Project site does not contain any residential structures.

Therefore, there is no potential for the Project to displace substantial numbers of people. No impact would occur and no mitigation is required.

Population and Housing: Mitigation Measures
Implementation of the proposed Project would result in no impact to Population and Housing. Thus, no mitigation measures are required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 57

4.15 Public Services
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Result in substantial adverse physical
impacts associated with the provision of
new or physically altered governmental
facilities, need for new or physically altered
governmental facilities, the construction of
which could cause significant
environmental impacts, in order to
maintain acceptable service ratios,
response times or other performance
objectives for any of the public services:
1) Fire protection? X
2) Police protection? X
3) Schools? X
4) Parks? X
5) Other public facilities? X
a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
1) Fire protection?
2) Police Protection?
3) Schools?
4) Parks?
5) Other public facilities
No Impact. Fire protection, police protection, and other public services are provided to the existing commercial land uses at the Project site. The addition of a digital billboard to the northwestern portion of the Project site would not create a measurable increase in demand for fire or police protection services because the site is already receiving these services. There is no component of the Project that would lead to increased demand for fire and police services. The Project would not create a direct demand for public school services, as the land use that would occupy the Project site (i.e., a digital billboard) would not generate any school -aged children requiring public education. No component of the Project would Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 58
measurably increase demand for public service facilities or result in the need to physically alter or cause the construction of new public service facilities. Because no physically expanded or new public facilities would be required, no impact would occur and mitigation is not required.

Public Services: Mitigation Measures
Implementation of the proposed Project would not increase public services demand such that new or physically altered public service facilities would need to be constructed or expanded to meet the demand.

Thus, no impact would occur and no mitigation measures are required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 59

4.16 Recreation
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Would the project increase the use of
existing neighborhood and regional parks
or other recreational facilities such that
substantial physical deterioration of the
facility would occur or be accelerated?
X
b. Does the project include recreational
facilities or require the construction or
expansion of recreational facilities which
might have an adverse physical effect on
the environment?
X
a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?
b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? No Impact. The construction and/or operation of a digital billboard on the north -central portion of the Project site would not increase the use of recreation facilities, because it would not create a measurable demand for recreational facilities through inducing population growth, inducing the growth of businesses or housing developments, or displacing existing recreational facilities. Accordingly, the Project would not increase the use of existing neighborhood and regional parks or other recreational facili ties such that substantial physical deterioration of the facilities would occur or be accelerated. Additionally, implementation of the Project would not include recreational facilities or require the construction of or expansion of recreational facilities which would have an adverse physical effect on the environment. No impact would occur, and mitigation is not required.

Recreation: Mitigation Measures
Implementation of the proposed Project would have no impact to Recreation. Thus, no mitigation measures are required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 60

4.17 Transportation
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Conflict with a program plan, ordinance or
policy addressing the circulation system,
including transit, roadway, bicycle and
pedestrian facilities?
X
b. Would the project conflict or be
inconsistent with CEQA Guidelines section
15064.3, subdivision (b)?
X
c. Substantially increase hazards due to a
geometric design feature (e.g., sharp curves
or dangerous intersections) or
incompatible uses (e.g., farm equipment)?
X
d. Result in inadequate emergency access? X
a) Conflict with a program plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities?
No Impact. Temporary traffic impacts would be restricted within the window of the Project’s construction schedule (less than a week) and between the permissible construction activity hours (7:00 a.m. to 7:00 p.m. on Mondays to Fridays) permitted by City of Baldwin Park Municipal Code § 130.04. Due to the small scale of the proposed construction of the billboard, Project construction would not require a substantia l quantity of truck hauls to the site. Additionally, the Project Applicant estimates that four (4) construction crew members would be required at the site each day throughout the construction of the Project, which would not generate a substantial quantity of trips during construction hours. Project operation is not anticipated to generate any additional trips to the Project site, with the exception of one two-way trip 6- 8 times per year in order to perform on-site maintenance of the billboard. Accordingly, the Project would not conflict with an applicable plan, ordinance or policy related to the circulation system. No impact would occur and mitigation is not required.
b) Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)?
No Impact. As discussed under Threshold a), trips generated by construction and operation of the Project would be nominal, and implementation of the Project would not generate trips that would conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b). Therefore, no impact would occur. c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? Less than Significant Impact. Project-related construction or operation would not require the construction of new roadways and the existing configuration of the roadways within the vicinity of the Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 61
Project site would remain unchanged; therefore, impacts re lated to sharp curves or dangerous intersections would not occur.

Implementation of the Project would be required to comply with the State Outdoor Advertising Act (2014) and the Federal Highway Beautification Act (1965). The Outdoor Advertising Act contains a number of provisions relating to the construction and operation of digital and static signs adjacent to roadways which are intended to prevent the creation of unsafe driving conditions along the adjacent roadways as a result of the presence of such signs. These provisions include, but are not limited to, the following:
• The placing of any light source “...of any color of such brilliance as to impair the vision of drivers upon the highway” is prohibited (Caltrans, 2014, § 21466.5); • The sign must b e constructed to withstand a wind pressure of 20 pounds per square feet of exposed surface;
• No sign shall display any statements or words of an obscene, indecent, or immoral character; No sign shall display flashing, intermittent, or moving light or lights; • Message center signs may not include any illumination or message change that is in motion or appears to be in motion or that change or expose a message for less than four seconds. No message center sign may be located within 500 feet of an existing bi llboard or 1,000 feet of another message center display, on the same side of the highway. (Caltrans, 2014, § 5401 - § 5405).

The Federal Highway Beautification Act governs advertising signage located along the interstate highway system, such as the I-10 freeway. The Federal Highway Beautification Act requires advertising signage be erected only in commercial or industrial zones and adhere to the following restrictions:
• No signs shall imitate or resemble any official traffic sign, signal or device, nor shall signs obstruct or interfere with official signs;
• Signs located on the same side of the freeway must be separated by at least 500 feet; and, • Signs shall not include flashing, intermittent or moving lights, and shall not emit light that may obstruct or impair the vision of any driver.

Mandatory compliance with State and Federal regulations would ensure that the Project would not increase hazards due to a design feature. Additionally, the Project site is designated as “Commercial/Industrial (CI)” by the City’s General Plan, and is designated “Industrial Commercial (I-C)” by the City’s Zoning Map. The installation of a digital billboard adjacent to the I-10 freeway is a land use that is a typically seen within commercial areas adjacent to freeways and would not conflict with future or existing large -scale commercial development. Considering the foregoing analysis and regulatory requirements, Project impacts would be less than significant and no mitigation is required. d) Result in inadequate emergency access?
No Impact. Under existing conditions, adequate emergency access is provided within the vicinity of the Project site. Project-related construction and operation would not obstruct existing roadways and would not alter the existing roadway system . No component of the Project would require the temporary or permanent closure of a roadway. Accordingly, the Project would not result in inadequate emergency access and no impact would occur.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 62
Transportation/Traffic: Mitigation Measures:

Implementation of the proposed Project would result in less -than-significant impacts to Transportation/Traffic. Thus, no mitigation measures are required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 63

4.18 Tribal Cultural Resources
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Cause a substantial adverse change in the
significance of a tribal cultural resource,
defined in Public Resources Code section
21074 as either a site, feature, pl ace,
cultural landscape that is geographically
defined in terms of the size and scope of the
landscape, sacred place, or object with
cultural value to a California Native
American tribe, and that is:
1) Listed or eligible for listing in the
California Register of Historical
Resources, or in a local register of
historical resources as defined in Public
Resources Code section 5020.1(k), or
X
2) A resource determined by the lead
agency, in its discretion and supported
by substantial evidence, to be significant
pursuant to criteria set forth in
subdivision (c) of Public Resources Code
Section 5024.1. In applying the criteria
set forth in subdivision (c) of Public
Resource Code Section 5024.1, the lead
agency shall consider the significance of
the resource to a California Native
American tribe.

X
a) Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
1) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k)? 2) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 64
Less Than Significant Impact . Assembly Bill (AB) 52 requires that lead agencies evaluate a project’s

potential impact on “tribal cultural resources”, which include “[s]ites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native Ame rican tribe that are eligible for inclusion in the California Register of Historical Resources or included in a local register of historical resources”. AB52 also gives lead agencies the discretion to determine, based on substantial evidence, whether a re source qualifies as a “tribal cultural resource.” AB 52 applies whenever a lead agency adopts an environmental impact report, mitigated negative declaration, or negative declaration.

In compliance with Assembly Bill 52, Native American tribes traditionally and culturally affiliated with the geographic area of the Project site were notified of the proposed Project on July 28, 2021 (See Appendix C). Pursuant to California AB 52, Native American Tribes that previously requested the City to notify them about projects of interest were given a 30 -day notice to request consultation regarding the Project. A notification list is maintained by the City of Baldwin Park and tribes requesting notification were sent notification via certified mail by the City of Baldwi n Park. A total of three tribes were notified of the proposed Project. The tribes notified included the Gabrieleno Band of Mission Indians – Kizh Nation, the Gabrieleno Tongva Tribe, and the Soboba Band of Luiseno Indians. The 30-day period concluded on August 27, 2021. The Gabrieleno Band of Mission Indians – Kizh Nation elected to consult on the Project.

Senate Bill (SB) 18 requires that lead agencies, “prior to the adoption or amendment of a city or county’s general plan, conduct consultations with California Native American tribes for the purpose of preserving specified places, features, and objects that are located within the city or county’s jurisdiction. The bill would define the term “consultation” for purposes of those provisions. By imposing new du ties on local governments with respect to consultations regarding the protection and preservation of California Native American historical, cultural, and sacred sites, the bill would impose a state-mandated local program.” As provided under Impact b) under Section 4.5: Cultural Resources, although unlikely, if significant archaeological resources are unearthed during ground disturbance activities, implementation of Mitigation Measure MM CR -1 and MM CR -2 would ensure that the Project’s potential impact to archaeological resources would be reduced to levels that are less than significant.

Tribal Cultural Resources: Mitigation Measures:

Implementation of the proposed Project would result in less -than-significant impacts to Triba l Cultural Resources. Thus, no mitigation measures are required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 65

4.19 Utilities and Service Systems
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Require or result in the relocation or
construction of new or expanded water, or
wastewater treatment or storm water
drainage, electric power, natural gas, or
telecommunications facilities, the
construction or relocation of which could
cause significant environmental effects?
X
b. Have sufficient water supplies available to
serve the project and reasonably
foreseeable future development during
normal, dry and multiple dry years?
X
c. Result in a determination by the
wastewater treatment provider which
serves or may serve the project that it has
adequate capacity to serve the project’s
projected demand in addition to the
provider’s existing commitments?
X
d. Generate solid waste in excess of State or
local standards, or in excess of th e capacity
of local infrastructure, or otherwise impair
the attainment of solid waste reduction
goals?
X
e. Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste?
X
a) Require or result in the relocation or construction of new or expanded water, or wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects? No Impact. Implementation of the Project would result in the construction and operation of a digital billboard on a site that is fully developed with commercial land uses under existing conditions. Due to the nature of the Project (digital billboard), it would not result in demand for water, wastewater, stormwater, or natural gas. Additionally, the Project would not substantially alter the Project site’s existing hydrological characteristics. With installation of the proposed Project, there would be no significant alteration of the site’s existing drainage pattern and there would not be any significant increases in the rate or quantity of surface runoff. The Project would utilize electric power, but not in a manner that would require or result in the relocation or construction of new facilities. Accordingly, no impact would occur and mitigation is not required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 66
b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years?
No Impact. The construction and operation of the proposed digital billboard would not create a demand for domestic water. No impact would occur and no mitigation measures are required. c) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
No Impact. Under existing conditions, the Los Angeles County Sani tation District (LACSD) adequately serves wastewater treatment services to the Project site. The construction and operation of a digital billboard would not generate wastewater or cause an increased demand for wastewater treatment. Thus, the Project woul d not adversely affect the physical capacity of the existing wastewater infrastructure system that services the site. No impact would occur and no mitigation measures are required. d) Generate solid waste in excess of State or local standards, or in exces s of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? Less than Significant . The City of Baldwin Park contracts with Waste Management of San Gabriel Valley/Pomona for solid waste collection services. Solid waste generated within the City is transported to the Scholl Canyon Landfill (SCLF), operated by the LACSD. As of 2011, the SCLF was calculated to have a remaining capacity of 9,900,000 cubic yards (or 3,400 tons per day) and has a cease operation date of April 1, 2030 (CalRecycle, 2021). Considering the remaining capacity (9,900,000 cubic yards) and cease operation date (April 1, 2030) of the SCLF, the SCLF would have sufficient capacity to accommodate the Project’s nominal construction-related waste generation. Additionally, Project excavation would remove soil from the northwestern corner of the Project site which would be transported to the Puente Hills Landfill, located 3.4 miles southwest of the Project site. The Puente Hills Landfill does not accept solid waste; however, according to the LACSD the Puente Hills Landfill has the capacity to accept to soil dumps.

Lastly, Project operations would not generate a substantial demand for solid waste beyond the existing demand of the Project site. Thus, the Project would not adversely affect the physical capacity of any landfills and a less-than-significant impact would occur. e) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
Less Than Significant Impact. The construction and operation of a digital billboard is not anticipated to generate a substantial demand for solid waste disposal. Project-related construction activities would generate nominal quantities of solid waste during the Project’s construction schedule (less than a week).

The Project would be required to comply with all applicable solid waste statutes and regulations; as such, impacts related to solid waste statutes and regulations would be less than significant. Accordingly, the Project would not foreseeably conflict with any Federal, State, and local statutes and regulations related to solid waste, resulting in a less-than-significant impact.

Utilities and Service Systems: Mitigation Measures:

Implementation of the proposed Project would result in less -than-significant impacts to Utilities and Service Systems. Thus, no mitigation measures are required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 67

4.20 Wildfire
If located in or near state responsibility areas
or lands classified as very high fire hazard
severity zones, would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Substantially impair an adopted emergency
response plan or emergency evacuation
plan?
X
b. Due to slope, prevailing winds, and other
factors, exacerbate wildfire risks, and
thereby expose project occupants to,
pollutant concentrations from a wildfire or
the uncontrolled spread of a wildfire?
X
c. Require the installation or maintenance of
associated infrastructure (such as roads,
fuel breaks, emergency water sources,
power lines or other utilities) that may
exacerbate fire risk or that may result in
temporary or ongoing impacts to the
environment?
X
d. Expose people or structures to signi ficant
risks, including downslope or downstream
flooding or landslides, as a result of runoff,
post-fire slope instability, or drainage
changes?
X
a) Substantially impair an adopted emergency response plan or emergency evacuation plan? b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes? No Impact. The Project site not located within a State Responsibility Area (SRA) and is not located within a Very High Fire Hazard Severity Zone (VHFHSZ) within a Local Responsibility Area (LRA). The Project site is relatively flat and does not contain any slopes or features that would exacerbate wildfire risks. In addition, the City’s General Plan states that because Baldwin Park is an urbanized community, structural fires rather than wildland fires represent the greatest fire risk throughout the City (Baldwin Park, 2002a, p. PS-9). The Project site is located within and is surrounded by urban built-up land. Accordingly, the proposed Project would not expose people or structures to a significant risk of loss, injury or death Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 68
involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands. No impact would occur and no mitigation is required.

Wildfire: Mitigation Measures:

Implementation of the proposed Project would result in less -than-significant impacts to Utilities and Service Systems. Thus, no mitigation measures are required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 69

4.21 Mandatory Findings of Significance
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Does the project have the potential to
substantially degrade the quality of the
environment, substantially reduce the
habitat of a fish or wildlife species, cause a
fish or wildlife population to drop below
self-sustaining levels, threaten to eliminate
a plant or animal community, substantially
reduce the number or restrict the range of
a rare or endangered plant or animal or
eliminate important examples of the major
periods of California history or prehistory?
X
b. Does the project have impacts that are
individually limited, but cumulatively
considerable?
(“Cumulatively considerable” means that
the incremental effects of a project are
considerable when viewed in connection
with the effects of past projects, the effects
of other current projects, and the effects of
probable future projects)?
X
c. Does the project have environmental
effects which will cause substantial adverse
effects on human beings, either directly or
indirectly?
X
a) Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife populati on to drop below self -sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? Less Than Significant Impact With Mitigation Incorporated. All impacts to the environment, including impacts to habitat for fish and wildlife species, fish and wildlife populations, plant and animal communities, rare and endangered plants and animals, and historical and pre -historical resources were evaluated as part of this IS / MND. Implementation of the Project would contribute additional development in the form of a digital billboard to a fully developed property and would not impact biological resources. As indicated in the discussion and analysis of Cultural Resources, none of the existing buildings on the Project site are included on the National Register of Historic Places, California Register of Historical Resources, or a local register of historical resources, nor are they eligible for listing; accordingly, there would be no impact to historical resources resulting from Project implementation. The Project site is fully developed under existing conditions; theref ore, no significant archaeological resources are likely Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 70
to be discovered during excavation activities. Additionally, the limited degree of excavation that would be required to install the proposed billboard column and associated utility connections would n ot result in impacts to significant archaeological resources. Nonetheless, in an abundance of caution, Mitigation Measures MM CR-1 and MM CR-2 would be implemented to reduce impacts to archaeological resources to a level below significance. Accordingly, the Project would not degrade the quality of the environment and impacts would be less than significant with implementation of Mitigation Measures MM CR -1 and MM CR-2.

Mitigation Measures: No additional mitigation measures are required. b) Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)?
Less Than Significant Impact With Mitigation Incorporated. Based on the analysis contained in this Initial Study, the proposed Project would not have cumulatively considerable impacts with implementation of Project mitigation measures. Implementation of standard conditions and mitigation measures at the Project-level would reduce the potential for the incremental effects of the proposed Project to be considerable when viewed in connection w ith the effects of past projects, current projects, or probable future projects.

Mitigation Measures: No additional mitigation measures are required. c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly?
Less Than Significant Impact With Mitigation Incorporated . Previous sections of this Initial Study reviewed the proposed Project’s potential impacts to human beings related to several environmental topical areas. As determined throughout this Initial Study, the proposed Project would not result in any potentially significant impacts that cannot be mitigated or reduced with implementation of mitigation measures and/or standard c onditions imposed by the City. The Project would not cause a substantial adverse effect on human beings, either directly or indirectly and impacts would be less than significant.

Mitigation Measures: No additional mitigation measures are required.

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 71

5.0 REFERENCES
Ahrens, Donald C., Meteorology Today: An Introduction to Weather, Climate, & the Environment, 2006.

CalFire, Fire Hazard Severity Zone Maps, Fire Hazard Severity Zones in SRA, https://osfm.fire.ca.gov/divisions/wildfire-planning-engineering/wildland-hazards-building- codes/fire-hazard-severity-zones-maps/, accessed December 7, 2021.

CalFire, Fire Hazard Severity Zone Maps, Very High Fire Hazard Severity Zones in LRA, https://osfm.fire.ca.gov/divisions/wildfire-planning-engineering/wildland-hazards-building- codes/fire-hazard-severity-zones-maps/, accessed December 7, 2021.

California Air Resources Board (CARB), Risk Reduction Plan to Reduce Particulate Matter Emissions from Diesel-Fueled Engines and Vehicles, October 2000,
https://www.arb.ca.gov/diesel/documents/rrpFinal.pdf
California Air Resources Board (CARB), California’s 2017 Climate Change Scoping Plan: The Strategy for Achieving California’s 2030 Greenhouse Gas Target, November 2017, https://ww3.arb.ca.gov/cc/scopingplan/scoping_plan_2017.pdf California Air Resources Board (CARB), EMFAC2017 Web Database, https://arb.ca.gov/emfac/2017/ California Department of Conservation (CDC), Seismic Hazard Zone Map - Baldwin Park Quadrangle. 1999, accessed September, 2016,
http://gmw.consrv.ca.gov/shmp/download/quad/BALDWIN_PARK/maps/ozn_ baldp.pdf California Department of Conservation (CDC), California Important Farmland Finder, https://maps.conservation.ca.gov/agriculture/, accessed December 8, 2021.

California Department of Fish and Wildlife, California Department of Fish and Wildlife (CDFW), California Regional Conservation Plans Map, 2019, accessed January 2021, https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=68626&inline California Department of Transportation (CalTrans), Scenic Highway System Lists, List of Eligible and Officially Designated State Scenic Highways and List of Officially Designated County Scenic Highways, https://dot.ca.gov/programs/design/lap-landscape-architecture-and-community- livability/lap-liv-i-scenic-highways, accessed January 7, 2021.

California Department of Transportation (CalTrans), Technical Noise Supplement to Traffic Noise Analysis Protocol, September 2013.

California Department of Transportation (CalTrans), Transportation and Construction Vibration Guidance Manual, September 2013.

California Department of Transportation (CalTrans), Outdoor Advertising (ODA), https://dot.ca.gov/programs/traffic-operations/oda
California Energy Commission (CEC), Inventory of California Greenhouse Gas Emissions and Sinks 1990 to 2004 (CEC-600-2006-013-SF.),
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 72
http://web.archive.org/web/20170323185651/http:/www.energy.ca.gov/2006publications/CEC- 600-2006-013/CEC-600-2006-013-SF.PDF
California Energy Commission (CEC), 2018 Power Content Label for Southern California Edison, https://www.energy.ca.gov/sites/default/files/2020-01/2018_PCL_Southern_California_Edison.pdf California Energy Commission (CEC), California Greenhouse Gas Emission Inventory – 2019 Edition, https://www.arb.ca.gov/cc/inventory/data/data.htm
California Energy Commission (CEC), Electricity Consumption by County, http://www.ecdms.energy.ca.gov/elecbycounty.aspx, accessed December 8, 2021.

California Energy Commission (CEC), Natural Gas Consumption by County, http://www.ecdms.energy.ca.gov/gasbycounty.aspx, accessed June 24, 2021.

California Energy Commission (CEC), 2019 Building Energy Efficiency Standards, https://www.energy.ca.gov/title24/2019standards/documents/2018_Title_24_2019_Building_Stan dards_FAQ.pdf, accessed June 23, 2020.

California Governor’s Office of Planning and Research (OPR), Transmittal of the Governor’s Office of Planning and Research’s Proposed SB97 CEQA Guidelines Amendments to the Natural Resources Agency, April 13, 2009,
https://planning.lacity.org/eir/CrossroadsHwd/deir/files/references/C01.pdf California Office of Historic Preservation (OHP), California Historical Resources, 2021, accessed January 2021, http://ohp.parks.ca.gov/ListedResources/?view=county&criteria=19 CalRecycle, SWIS Facility/Site Activity Details,
https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/3531?siteID=1000, accessed December 8, 2021.

City of Baldwin Park. City of Baldwin Park 2020 General Plan, 2002a, accessed September 2016, https://www.baldwinpark.com/online-documents/community-development/planning/general- plan-individual-elements
City of Baldwin Park, City of Baldwin Park 2020 General Plan Update EIR, 2002b, accessed September 2016.

City of Baldwin Park. 2020. Baldwin Park Code of Ordinances, https://codelibrary.amlegal.com/codes/baldwinpark/latest/overview, accessed January 8, 2021.

Daktronics, Inc., Lighting Analysis for Daktronics DB 14’ x 48’ Digital Display 1529 Virginia Ave., Baldwin Park, CA 91706, December 11, 2020.

Federal Transit Administration (FTA), Transit Noise and Vibration Impact Assessment, May 2006.

Google Earth Pro, Google Earth Pro Program, 2021, accessed January, 2021 Intergovernmental Panel on Climate Change (IPCC), 2013, Climate Change 2013: The Physical Science Basis, Summary for Policymakers.,
http://www.climatechange2013.org/images/report/WG1AR5_SPM_FINAL.pdf Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 73
Los Angeles County Airport Land Use Commission (ALUC). 2014. County of Los Angeles Airports and Airport Influence Areas. Web. Accessed January, 2021. Available:
http://planning.lacounty.gov/assets/upl/project/ALUC_Airports_June2012_rev 2d.pdf South Coast Air Quality Management District (SCAQMD), CEQA Air Quality Handbook, 1993, https://www.aqmd.gov/home/rules-compliance/ceqa/air-quality-analysis-handbook# South Coast Air Quality Management District (SCAQMD), Final 2016 AQMP, http://www.aqmd.gov/home/air-quality/clean-air-plans/air-quality-mgt-plan/final-2016-aqmp Southern California Association of Governments (SCAQMD), 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy, April 2016,
http://scagrtpscs.net/Pages/FINAL2016RTPSCS.aspx
United States Geological Survey (USGS). 2004. Geologic Setting of the Transverse Ranges Province. Web.

Accessed September, 2016. Available:
http://geomaps.wr.usgs.gov/archive/scamp/html/scg_trans_sgm.html United States Geological Survey (USGS). 2016. Quaternary Fault and Fold Database of the United States.

Web. Accessed January, 2021. Available: http://earthquake.usgs.gov/hazards/qfaults/map/#qfaults United States Green Building Council (USGBC), Green Building Costs and Savings, 2020, https://www.usgbc.org/articles/green-building-costs-and-savings, accessed June 24, 2020.

United States Environmental Protection Agency (U.S. EPA), Climate Change Indicators in the United States: Global Greenhouse Gas Emissions, Updated May 2014, www.epa.gov/climatechange/indicators
United States National Parks Service (NPS). 2014. National Register of Historic Places Program: Research.

Web. Accessed January, 2021. Available: https://www.nps.gov/nr/research/ Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration
January 2022 Page 74

6.0 REPORT PREPARATION PERSONNEL
City of Baldwin Park (Lead Agency)
Community Development Dept.
14403 East Pacific Avenue
Baldwin Park, CA 91706
Melissa Chipres, Associate Planner
De Novo Planning Group (Environmental Consultant)
1020 Suncast Lane, Suite 106
El Dorado Hills, CA 95762
916.949.3231
Ben Ritchie, Principal Planner
Josh Smith, Associate Planner
Technical Specialists
Daktronics (Lighting)
201 Daktronics Drive, PO Box 5128
Brookings, SD 57006
Eric Johnson, Applications Engineer
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration Screencheck Review Draft January 2021 Page 75
APPENDIX A – SIGN LIGHTING STUDY

201 Daktronics Dr. PO Box 5128
Brookings, SD 57006-5128
tel 800-325-7446 605-692-0200
fax 605-692-0381
www.daktronics.com
December 11, 2020
Re:   Lighting Analysis for Daktronics DB 14’ x 48’ Digital Display 1529 Virginia Ave., Baldwin Park, CA 91706
The attached lighting analysis pertains to the digital billboard display manufactured by Daktronics, Inc., and proposed for installation at 1529 Virginia Ave., Baldwin Park, CA 91706.  The following is an explanation of the analysis:

1. Units of Measurement.   A foot‐candle (or foot‐candle, fc, lm/ft2, or ft‐c) is a measurement of light intensity.

DF-02766

One foot‐candle is defined as enough light to saturate a one‐foot square with one lumen of light. For example, where the display illuminates at 0.19 foot‐candles, it has a light intensity of approximately 19% of a single wax candle as viewed from 1 foot away.

2. Assumptions: The accompanying graph depicts illumination levels in foot candles that the display will

produce based on nighttime running levels at a measurement height of 87 feet in elevation. The measurements assume total darkness with regards to the surrounding light and an all‐white content on the display.  These assumptions provide for the worst‐case scenario, not the more likely application.

3. Practical Application: Typical content runs at 25‐35% of the brightness of all‐white content, therefore, the

4. Ambient Light Effects. The presence of ambient light producing elements at night including, but not limited actual levels of illumination will nearly always be markedly lower than that shown in the graph. to, roadway and traffic lighting, commercial lighting from nearby commercial properties, the moon, etc., will further diminish the impact of the light output from the display in question.

5. Other Limiting Factors. Daktronics digital billboards produce directional illumination which means the light

shines in an out‐and‐downward fashion which limits illumination onto unintended areas. Further, the Daktronics digital display is equipped with a light sensor allowing for automatic dimming utilizing 256 levels of dimming. The display’s dimming capabilities are designed to ensure that it does not exceed 0.3 foot candles above ambient light as measured from an appropriate distance from the signi. The 0.3 foot candles metric is a leading industry standard and has been adopted in numerous states and municipalities throughout the U.S.

201 Daktronics Dr. PO Box 5128
Brookings, SD 57006-5128
tel 800-325-7446 605-692-0200
fax 605-692-0381
www.daktronics.com
Please let me know if you have any questions or concerns.

Sincerely,
Daktronics, Inc.

Eric Johnson
Applications Engineer
605‐692‐0200
DF-02766
i Please note, while the sign’s brightness during daylight hours would be almost always incidental, there may be times in which the sign would produce illumination levels above ambient light during such hours. Examples when such an occurrence could happen would be during a very dark and stormy day. It is important to note, however, that the sign is equipped with a working photo‐sensor that automatically adjusts its brightness based on ambient light. The photo‐sensor adjusts the sign’s brightness to lower levels, preventing the sign from appearing overly bright during those rare occasions where its brightness would exceed ambient light.

D ate:
12/9/2020
Light Analysis for D B 14’ x 48’
Lam ar AdverƟsing
1529 Virginia Ave., Baldw in Park, CA 91706
Values expressed are specific to D aktronics product only Prepared by:

Eric Johnson
*CalculaƟons are based on Red, G reen, and Blue LED s (W hite Content) pow ered to their m axim um potenƟal for nighƫ m e view ing. Values are show n in footcandles (fc). -D isplay at 3% of M axim um D ayƟm e Brightness
-CalculaƟons take into account an overall height of 87’ -Any rise or fall in elevaƟon or physical blockage is not show n in calculaƟons 750’
500’
250’

Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration Screencheck Review Draft January 2021 Page 76
APPENDIX B – APPROVED PLANS

REAR
LADDER
17'-6"
48'-0" FACE
4'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
4'-0"

WALKWAY
LEDGER

WALKWAY
1"
W6x9
1/2"
1/2" Ø
1/2" Ø J-BOLT,

EACH SIDE OF WALKWAY
1/2"
J-BOLT1/2" Ø J-BOLT

GRATING X EXPANDED METAL
WELDED TO ANGLES @ 18" O.C.

3.14 psf - FOR WALKWAY
(3'-1 1/2" WIDE)

2.0 psf - FOR WALKWAY
(2'-1 1/2" WIDE)
FRAME
L4"x3"x1/4" LLV FOR FRONT WALKWAY
L3"x3"x1/4" FOR REAR WALKWAY

TYPICAL WALKWAY DETAIL

REAR LEDGER
3 SIDES

REAR LEDGE
3 SIDE

WALKWAY MOUNTING DETAIL
1/4

UPRIGHT

CLIP ANGLE
L 3"x3"x1/4" x 4 3/4"
w/ (2) 1/2"Ø
A-307 BOLTS

CLIP ANGL
L 3"x3"x1/4" x 4
w/ (2) 1/2
A-307 BOLT
1 3/4"
1 3/4"
1 1/8"1 1/8"

SECTION E-E
3/8"Ø 7 x 19

PREFORMED

GALVANIZED STEEL

AIRCRAFT STRAND
3/8"Ø CROSBY CLIP, G-450
OR EQUAL (3 REQUIRED PER

CONNECTION)
CABLE - IN MEASURED POSITION (A FORCE OF 1O LBS.

SHALL BE APPLIED TO THE CABLE WHEN MEASURING THE
DEFLECTION, TO TAKE THE SLACK OUT OF CABLE.) UPRIGHT
SPAN = L 3/8" Ø GALVANIZED

WIRE ROPE THIMBLE
10" MIN.
4"3/4" Ø DROP FORGED
EYEBOLT w/ LOCK WASHER
AND 2 HEAVY HEX NUTS
4"

CABLE - RELAXED
C 5 x 6.7
L / 30

SAFETY CABLE MOUNTINGSAFETY CABLE TENSION

CABLE MOU CABLE MOU
LEVEL

CABLE MOUNT CABLE MOUNT
1/4
2 1/2"
L 2" x 2" x
L 2" x 2" x
AT 4'-4" O.C. M
L 2" x 2" x

CROSSOVER O

WALKWAY FRAMIN

CROSSOVER OR

WALKWAY FRAMING
L 2" x 2" x 3/8"
AT 4'-4" O.C. MAX.

L 2" x 2" x 1/4"
L 2" x 2" x 1/4"
1'-9"
3'-6"
1'-9"
1/4

TYPICAL HAND RAIL CONNECTION
(1) 5/8"Ø A307 BOLT

AT EACH POST
(1) 5/8"Ø A307 B

AT EACH PO
1 1/8"

FRONT LEDGER
1 1/8"

CLIP ANGLE
L 3" x 3" x 3/8"
w/ (2) 1/2"Ø
A-307 BOLTS
@ EACH LEG

UPRIGHT

CLIP ANGL
L 3" x 3" x
w/ (2) 1/2
A-307 BOLT
@ EACH L
1 1/2"

SECTION D-D
1/4
1/4

UPRIGHT

STRINGER
L 4" x 3" x
LLH

CLIP ANGL
L 5" x 3" x 1/4" x 4
w/ (2) 1/2"Ø A-307 B
GA. 2
L 4" x 3" x 1/4"

CLIP ANGLE
L 5" x 3" x 1/4" x 4 3/4" LLH
w/ (2) 1/2"Ø A-307 BOLTS
GA. 2 1/4"
3 3/4"

STRINGER MOUNTING DETAIL
2 1/2"
1/4

PLAN VIEWPLAN VIEW

CLIP ANGL
L 3x3x1/4 x 0'

CLIP ANGLE
L 3x3x1/4 x 0'-3"

DOUBLE NUT

SPREADER
OR

UPRIGHT
BRACE
BAR 3/4"BAR 3/4"Ø

CROSS BRACE DETAIL
4 1/2"
1 1/2"
(8) 5/8"
A-325 BOLT
GA. 2
(8) 5/8"Ø
A-325 BOLTS
GA. 2 1/4"

SECTION B-B

TORSION
UPRIGHT-SPREADER-TORSION CONN.

W12x30 /
W12x40

SPREADER
W12x30
W

UPRIGHT-SPREADER-TORSION CONN
CC
UPRIGHT W12x16
1/4
PL 1/4
2"x6"
B.S.

PL 1/4"
B
B
VARIES
PL 3/8
3"x
PL 3/8"
3"x FIT B.S. 1/4
1/4
1/4
2" ON CL
W12x30
W12x40
W12x30 /
3"
4 1/2"
1'-0"

SECTION C-C
4"
1'-0"
4"
1 1/2"1 1/2"
1/4
1/4
PL 3/8"
3"x FIT B.S.

PL 3/8
3"x FIT B.
3 1/2"
1 1/2"
3"
PL 1/2"x7 1/2"PL 1/2"x7 1/
x1'-6"
1'-8"
TORS
COL

TORSION
COLUMN
3/4"Ø

SPREADER
CROSS
BRACE
w/ (2) 1/2"Ø
A-307 BOLTS
@ EA. CONN.
(T & B)
BRACE
L3"x3"x1/4"
w/ (2) 1/2
A-307 BOLT
@
(T &

TORSION
BRACE

SEE CROSS

BRACE DETAIL
REAR

WALKWAY

SECTION F-F
L3"x3"x1/4"
EQ. SPACED
(4) REQ'D
1/42-6
(8) 3/4"Ø
A-325 BOLTS
GA. 3 1/2" (W12x30)
GA. 5 1/2" (W12x40)
17'-6"
T
C

TORSION
COLUMN

LED DISPLAY
(BY OTHERS)
17'-0"17'-0"
14'-0"
FACE
3'-0"
APRON

UPRIGHT

TORSION
BRACE
BRACE
REAR

WALKWAY

TORSION
5 EQ. SP.@ 8'-0" = 40'-0"
48'-0" FACE
4'-0"4'-0"
COLUMN SPLICE 1 DETAIL
5'-6"
LOWER

COLUMN PIP
48"Ø x 1.
(Fy = 45 K

COLUMN PIPE
48"Ø x 1.00"
(Fy = 45 KSI)
UPPER

COLUMN PIPE
42"Ø x .875"
3/8(Fy = 45 k
1" RIN
PLATE
(Fy = 45 ksi)
1" RING
1 3/8
@ 30° O.C.
6"
3/8

2.5 1"
MIN.
1/2"
1/2
1 1/2" RI
PLATE
1 1/2" RING

ELEVATION
73'-0"
H.A.G.L.
2 3/4" BACK SET COLUMN
PER 1/4" PER 4'-0"
90'-0"
O.A.H.
32'-0"

SEE COLUMN
SPLICE 1 DETAIL
31'-0"
COLUMN SPLICE 2 DETAIL
6'-0"

LOWER COLUM
PIPE
54"Ø x 0.75
(Fy = 45

LOWER COLUMN
54"Ø x 0.750"
(Fy = 45 KSI)
UPPER

COLUMN PIPE
48"Ø x 1"
(Fy = 40 ksi) 3/8
1" RIN
PLATE
1" RING
3/8
1 3/
@ 30° O.
1 3/8
@ 30° O.C.
2 3/4
6"
2"
MIN.
1"
1/2
1 1/2" RING1 1/2" RI
PLATE

SLOPE CONCRET

AWAY FROM PI

SLOPE CONCRETE

AWAY FROM PIPEGRADE

SEE COLUMN
SPLICE 2 DETAIL

SEE COLUM
SPLICE 2 DETA
10'-0"

COLUMN-TORSION CONNECTION
PL 1 1/2"
1'-9"
W36x150
10"

TORSION PIP
36"Ø x 0.6
(Fy = 42 ksi)

TORSION PIPE
36"Ø x 0.625"
1'-3"
PL 1/2"

GUSSETS
UPPER(20) REQ'D
COLUMN PIPE(5) @ EA.
42"Ø x 0.875"
(Fy = 45 ksi)
CORNER
3/8
6 1/8"
1/4
5/16
AA
PL
1/2"
TYP.

TYP.
1'-9"
1'-9"PL 1
4" PL
5/8"
(20) 1 1/2"Ø (PT)
A-325 BOLTS

SECTION A-A
PL 1 1/2"
4'-6"
SQUARE
3"
6"
6"
3"
6"1'-6"
3"
6" 1'-6"
6"
6"
3"
6"
6"
6"
6"
45°
3'-0"
APRON
14'-0"
FACE
UPRIGHT W12x16
APRON

TYPICAL SECTION THRU SIGN

DIGITAL DISPLA

AND ATTACHMEN
(BY OTHERS

DIGITAL DISPLAY

AND ATTACHMENT
(BY OTHERS)
3'-6" 5 1/2"
2'-1 1/2"
BRACE L3"x3"x1/4"
w/ (2) 1/2"Ø A-307 BOLTS
@ EACH CONNECTION
BRACE L3"x3"x1/4
w/ (2) 1/2"Ø A-307 B
@ EACH CONNECTI
5 1/2"
2'-1 1/2"
VARIES

TORSION
5'-0"

SPREADER
2'-1 1/2"
5 1/2"LOWER REARLOWER REA

WALKWAY
1'-6"
1'-2"
E
E
W6x9
BRACE L3"x3"x1/4"
w/ (2) 1/2"Ø A-307 BOLTS
@ EACH CONNECTION
TBD
6'-0"Ø
FF
10'-0"
10'-0"10'-0"
DECORATIVE BOLLARD, ASTM A48 CLASS 30

CAST IRON BLACK POWDER COAT FINISH
(BY OTHERS)
DECORATIVE BOLLARD, ASTM A48 CLA

CAST IRON BLACK POWDER COAT F
(BY OTHERS
C:\USERS\FANNIE\DESKTOP\RMG\RMG E-SHEETS\2020\LAMAR PRELIM BALDWIN PARK CAC:\USERS\FANNIE\DESKTOP\RMG\RMG E-SHEETS\2020\LAMAR PRELIM BALDWIN PARK CAC:\USERS\FANNIE\DESKTOP\RMG\RMG E-SHEETS\2020\LAMAR PRELIM BALDWIN PARK CAC:\USERS\FANNIE\DESKTOP\RMG\RMG E-SHEETS\2020\LAMAR PRELIM BALDWIN PARK CAC:\USERS\FANNIE\DESKTOP\RMG\RMG E-SHEETS\2020\LAMAR PRELIM BALDWIN PARK CAC:\USERS\FANNIE\DESKTOP\RMG\RMG E-SHEETS\2020\LAMAR PRELIM BALDWIN PARK CA DATE
JOB NO.SHEET NO.
14' x 48'

SINGLE POST

PARTIAL FLAG

DOUBLE FACE
35' V-BUILD

LED READY (BOTH SIDES)
DR.CH.
03/27/20
S1 of 1

CUSTOMER

LAMAR ADVERTISING

THIS PRINT IS THE PROPERTY OF

SIGN LOCATION
1529 VIRGINIA AVE

BALDWIN PARK, CA

RMG OUTDOOR, INC

PROFESSIONAL SEAL VALID ONLY WHEN
FABRICATED BY THE ABOVE. IT I
PROVIDED FOR PERMIT PURPOSES ONLY.

ANY OTHER USE OR REPRODUCTION IS

PROHIBITED WITHOUT WRITTEN

AUTHORIZATION FROM
RMG OUTDOOR, INC.

FS
OUTDOOR, INC.

FABRICATED BY THE ABOVE. IT IS
Phoenix, Arizona 8501
4425 North 24th Street, Suite 200
Phn: (602) 230-8634 Fax: (602) 230-90
Phoenix, Arizona 85016
Phn: (602) 230-8634 Fax: (602) 230-9071
JES
ENG. NO.

G-XX PRELIMINARY DRAWINGNOT FOR CONSTRUCTION

NOTES AND SPECIFICATIONS
(APPLY UNLESS OTHERWISE NOTED)
RISK CATEGORY: II
DESIGN WIND PRESSURE (SERVICE LEVEL): 28.8 PSF (AVERAGE), 40.2 PSF (MAXIMUM AT ENDS), REFER TO ASCE 7-16 FIGURE 29.3-1.

ANY SIGN COMPONENTS NOT SPECIFICALLY DETAILED ON THESE DRAWINGS BUT ATTACHED TO THE STRUCTURE SHALL BE DESIGNED IN ACCORDANCE WITH THE INFORMATION ABOVE.

SEISMIC DESIGN - SIGN STRUCTURE SEISMIC LOADS ARE DETERMINED IN ACCORDANCE WITH ASCE 7-16 CHAPTER 15 USING DATA FOR SIGNS AND BILLBOARDS FROM TABLE 15.4-2.:

CATEGORY: II
MAPPED SPECTRAL RESPONSE ACCELERATIONS: SS = 1.395, S1 = 0.548 SITE CLASS: D
SPECTRAL RESPONSE COEFFICIENTS: S =0.93, S = 0.548
SEISMIC DESIGN CATEGORY: "D"
FORCE RESISTING SYSTEM: CANTILEVERED COLUMN
DESIGN BASE SHEAR: 10.76 KIPS

SEISMIC RESPONSE COEFFICIENT (C
RESPONSE MODIFICATION FACTOR (R): 3.0
SEISMIC BASE SHEAR IS DETERMINED IN ACCORDANCE WITH SECTION 12.8 "EQUIVALENT LATERAL FORCE PROCEDURE" USING THE DESIGN DATA ABOVE
DESIGN LIVE LOAD - MAINTENANCE PLATFORM. 40 PSF OR 300 LBS CONCENTRATED LOAD.

DESIGN DEAD LOAD -
LED DISPLAY: 9000 LBS EACH (FUTURE)
OTHER STRUCTURAL MEMBERS: AS NOTED IN CALCULATIONS
STEEL - WIDE FLANGES - ASTM A-992, OTHER SHAPES & PLATES - ASTM A-36.

PIPE SECTIONS - ASTM A-53 GR B OR A 252 GR 2, OR API - LX WITH MINIMUM YIELD STRENGTH AS INDICATED ON DRAWINGS.

EXPANDED METAL GRATING - EXPANDED METAL GRATING SHALL BE MANUFACTURED FROM

CARBON STEEL IN CONFORMANCE WITH THE EXPANDED METAL MANUFACTURERS ASSOCIATION (EMMA) STANDARD NO. 557-99, 'STANDARDS FOR EXPANDED METAL.' EMMA IS A DIVISION OF THE NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM).

ALL STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED ACCORDING TO LATEST AISC SPECIFICATIONS AND STANDARD PRACTICE.

PAINTING - ALL STRUCTURAL STEEL, EXPOSED TO WEATHER, SHALL BE SHOP PRIMED AND PAINTED IN ACCORDANCE WITH AISC 335 (SPECIFICATION) AND AISC 303 (STANDARD PRACTICE). - CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSI (DESIGNED AT 2,500) AT 28 DAYS AND BE PLACED IN ACCORDANCE WITH ACI 318. CONCRETE MIX SHALL BE PROPORTIONED WITH A MAXIMUM SLUMP OF 5”.

WELDING - ALL WELDING PROCEDURES, MATERIALS AND COMPONENTS SHALL BE IN COMPLIANCE WITH AWS D1.1 USING E70XX OR EQUAL. FIELD WELDING IS NOT ALLOWED WITHOUT APPROVAL OF ENGINEER. ALL FIELD WELDING WILL REQUIRE SPECIAL INSPECTION.

BOLTS - ALL REGULAR SHALL CONFORM TO ASTM A-307. HIGH STRENGTH BOLTS SHALL CONFORM TO ASTM A-325N. ALL BOLTS SHALL BE INSTALLED TO A SNUG TIGHT CONDITION UNLESS NOTED TO BE PRE-TENSIONED (PT). PT BOLTS SHALL BE FULLY TENSIONED PER AISC TURN OF THE NUT METHOD (1/3 OF A TURN PAST A SNUG TIGHT CONDITION) OR OTHER AISC APPROVED TENSIONING

ROUND COLUMN FOOTING - EMBEDMENT DEPTH FOR FOOTING DOES NOT APPLY TO LOCATIONS

WHERE WALLS OF THE HOLE WILL NOT STAND WITHOUT SUPPLEMENTAL SUPPORT, OR WHERE UNCOMPACTED FILL OR ORGANIC FILL EXISTS. FOUNDATION IS DESIGNED UTILIZING LATERAL BEARING PER IBC SECTION 1807.3.2.1. DESIGN LATERAL SOIL PRESSURE PER IBC TABLE 1806.2 IS 300 PSF/FT (SOIL CLASS 4 - TYPE: SAND, SILTY SAND, CLAYEY SAND, SILTY GRAVEL, AND CLAYEY ALLOWABLE LATERAL SOIL PRESSURE HAS BEEN MULTIPLIED BY 2 PER SECTION 1806.3.4. VERIFY SOIL TYPE DURING EXCAVATION. NOTIFY ENGINEER OF ANY DISCREPANCY.

AND NOTIFY ENGINEER OF ANY DISCREPANCIES. ERECTORS SHALL NOTIFY ENGINEER IF CODE - 2019 CBC
WIND DESIGN - SIGN STRUCTURE WIND LOADS ARE DETERMINED IN ACCORDANCE WITH ASCE 7-16 SECTION 29.3.1.

BASIC WIND SPEED: 115 MPH (3 SECOND GUST)
RISK CATEGORY:

EXPOSURE: C
DESIGN WIND PRESSURE (SERVICE LEVEL): 28.8 PSF (AVERAGE), 40.2 REFER TO ASCE 7-16

ANY SIGN COMPONENTS NOT SPECIFICALLY DETAILED ON THESE DRAWINGS BUT

THE STRUCTURE SHALL BE DESIGNED IN ACCORDANCE WITH THE IN

SEISMI SIGN STRUCTURE SEISMIC
ASCE 7-16 CHAPTER 15 USING DATA
RISK C
= 0.

SITE CLASS:

SPECTRALDS =0.93,D1 = 0.

SEISMIC DESIGN CATEGORY:

FORCE RESISTING SYSTEM: CANTILEV
DESIGN BASE SHEAR: 10.76
SEISMIC S): 0.310

RESPONSE MODIFICATION FACTOR
SEISMIC BASE SHEAR IS DETERMINED IN ACCORDANCE WITH SECTION 12.8 "EQUIVAL FORCE PROCEDURE" USING THE DESIGN DATA
DESIGNMAI00 LBS CONCENTR

DESIGN DEAD LO
LED DISPLAY: 9000 LBS EACH (FU
OTHER STRUCTURAL MEMBERS: AS NOTED IN CALCUL
- WIDE FLANGES - ASTM
- ASTM A-53 GR B OR A 252 GR

INDICATED ON DRAWING
- EXPANDED METAL GRATING SHALL

ALL STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED ACCORDING TO

SPECIFICATIONS AND STANDARD PRACTI
- ALL STRUCTURAL STEE
PAINTED IN ACCORDANCE WITH AISC 335 (SPECIFICATION) AND AISC 303 (STANDARD

CONCRETE - CONCRETE SHALL HAVE A MINIMUM COMPR
(DESIGNED AT 2,500) AT 28 DAYS AND BE PLACED IN ACCORDANCE WITH AC

SHALL BE PROPORTIONED WITH A MAXIMUM S

WELDIN- ALL WELDING PROCEDURES
WITH AWS D1.1 USING E70XX OR EQUAL. FIELD WELDING IS NOT ALLOWED WI OF ENGINEER. ALL FIELD W

BOL - ALL REGULAR SHA
TO ASTM A-325N. ALL BOLTS SHALL BE INSTALLED TO A SNUG TIGHT CONDITIO TO BE PRE-TENSIONED (PT). PT BOLTS SHALL BE FULLY TENSIONED PER AISC T METHOD (1/3 OF A TURN PAST A SNUG TIGHT CONDITION) OR OTHER AISC APPRO METHOD.
- EMBEDMENT DEPTH FOR FO

WHERE WALLS OF THE HOLE WILL NOT STAND WITHOUT SUPPLEMENTAL SUPPO UNCOMPACTED FILL OR ORGANIC FILL EXISTS. FOUNDATION IS DESIGNED UTILIZ

BEARING PE
300 PSF/FT (SOIL CLASS 4 - TYPE: SAND, SILTY SAND, CLAYEY SAND, SILTY GRAVEL, AND CLAYE GRAVEL). ALLOWABLE LATERAL SOIL PRESSURE HAS BEEN MULTIPLIED BY 2 PER SECTIO 1806.3.4. VERIFY SOIL TYPE DURING EXCAVATION. NOTIFY ENGINEER OF ANY DISCREPANC EXTEND COLUMN PIPE TO BOTTOM OF FOOTING (3" CONCRETE COVER REQUIRED) SPECIAL INSPECTIONS - SPECIAL INSPECTIONS ARE REQUIRED PER CHAPTER 17 FOR THE FOLLOWING ITEMS:
--HIGH STRENGTH BOLTS: PERIODIC INSPECTION TO REVIEW BOLT TYPE AND TENSION --PIER FOUNDATION: VERIFY PROPER DEPTH AND DIAMETER

STEEL FABRICATOR - ALL STRUCTURAL STEEL SHALL BE SHOP FABRICATED BY THE FOLLOWING CITY OF LOS ANGELES APPROVED FABRICATOR:

PAGE STEEL
2040 INDUSTRIAL DRIVE
PAGE, AZ 85040

UNLESS SPECIFICALLY INDICATED AS FIELD WORK, NO FIELD WELDING IS ALLOWED WITHOUT THE APPROVAL OF THE ENGINEER OF RECORD. SPECIAL INSPECTIONS IS REQUIRED FOR ALL FIELD WELDING.

THE ERECTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD BEFORE ERECTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES. ERECTORS SHALL NOTIFY ENGINEER I STRUCTURE IS LOCATED NEAR ANY BUILDINGS.

THE UNDERSIGNED ENGINEER WILL NOT SUPERVISE THE FABRICATION OR ERECTION OF THIS STRUCTURE.

DAKTRONICS.COM E-MAIL: [email protected]
201 Daktronics Drive, PO Box 5128, Brookings, SD 57006
Phone: 1-800-325-8766 or 605-692-0200 Fax: 605-697-4746 DD4570066 REV01 112719

DIGITAL BILLBOARD MODEL SPECIFICATIONS
SIZE
(INDUSTRY
NAMES)

DISPLAY SIZE

ACTIVE AREA

OVERALL

DISPLAY SIZE

ROWS AND

COLUMNS

PIXEL SPACING
(MM)

DISPLAY
WEIGHT

OPERATING
AMPS**
POWER

REQUIREMENTS
14' x 48'
(Bulletin) 13'2" x 47'3" 13'8" x 47'9" 200 x 720
240 x 864
20 MT
16 MT
5,050 lbs
(2,295 kg) 16 amps 64 amps
*Brightness can be adjusted to meet local regulations.
**Measurements based on content over a 24 hour period @120/240VAC.

For precise measurements, request a Daktronics shop and riser drawing.

DB-6500 14'x48' PRODUCT SPECIFICATIONS

Power Requirements:
64 Amps
Brightness*:
8,500 nits when shipped;
5,000 nits at year 10 guarantee
Service Access:

Front and rear access-standard
Environmental Protection:

Fully-sealed IP-67 module, fully-sealed
power supply, and PLR
LEDs per Pixel:
3 color matched LEDs: 1 red, 1 green, 1 blue
Viewing Angle:
160° H x 70° V
Compliance Information:
redundant communication
UL, cUL, UL-Energy Verified,
Multidirectional Light Sensor System:

IBC 2012, FCC Compliant
Operating Temperature:

Multi-direction sensing with
power-saving algorithms
-30° to +120° F (-34° to +49° C)
Contrast:

Surge Suppression:

High-contrast, non-reflective louver design
Color Capability:

Standard
19 bit - 144 quadrillion
Light Control Standards:

Complies with local, federal, and
industry light output standards
Diagnostics:

Advanced diagnostics checks
the following:
- Module and display temperatures
- Display dimming
- Non-visual alerts
- Visual inspection
Filterless Display:

Less maintenance, sealed components
with increased reliability
Integrated Control System:
- Governs hold times
- Limits media to static images
Display Calibration:

Factory calibrated individual LEDs
Display Dimming:
256 dimming levels
Snap™ Technology:

Automatically blend new modules
with existing
Visual Verification:
- Webcam
- Retractable webcam arm
(where applicable)
SmartLink™:

Remote control and
Virginia Avenue Digital Billboard Project
Initial Study/Mitigated Negative Declaration Screencheck Review Draft January 2021 Page 77
APPENDIX C – TRIBAL CONSULTATION LETTERS
July 28, 2021
Linda Candelaria
Co-Chairwoman
C/O Sam Dunlap, Cultural Resource Representative
Gabrielino Tongva Tribe
[email protected]
RE: Tribal Consultation Notification Pursuant to Assembly Bill 52; 1529 Virginia Avenue Project, Baldwin Park, California
Chairwoman Candelaria:

This letter is to notify you of the proposed double faced digital billboard at 1529 Virginia Ave. (APN: 8558- 032-018), (Proposed Project) described below in the City of Baldwin Park (City), Los Angeles County, California. Pursuant to the California Environmental Quality Act (CEQA) and CEQA Guidelines, the City, as Lead Agency, has initiated preparation of an Initial Study/Mitigated Negative Declaration for the Proposed Project.

The subject property is located in an “Industrial Commercial” (I-C) Zone. The surrounding land uses and zoning consists of Industrial Commercial (I-C) to the north, west, and south, and Freeway Commercial (F- C) on the east of the subject property.

The proposed project has been tentatively approved by the City’s Design Review Committee and requires approval by the Planning Commission of the following entitlements:

1. Design Review for the billboard architecture and site design.

2. Development Agreement review for the
Your tribal group is invited to contact the City and participate in AB 52 consultation with the City pertaining to the Proposed Project. Please consider this letter and preliminary project information as the formal notification of the Proposed Project. The point of contact for the City is as follows.

Name/Title: Melissa Chipres, Associate Planner
Address: 14403 E. Pacific Ave
City and Zip Code: Baldwin Park, CA 91706
Telephone: 626.960.4011, ext. 452
Email: [email protected]
The City would appreciate receiving any comments, information or questions you may have regarding cultural places within the Proposed Project site. All information provided will be kept confidential.

Pursuant to Government Code Section 65352.3, please respond with 30 thirty days of the date of this letter if you would like to consult on the Proposed Project. Apart from consultation, please contact Melissa Chipres, Associate Planner, at 626.960.4011, ext. 452 if you would like to be notified of public hearings for the proposed project or if you have any questions or concerns with the proposed project.

Thank you for your involvement in this process and your attention to this matter.

Sincerely,
Melissa Chipres
Associate Planner
July 28, 2021
Mr. Andrew Salas, Chairperson
Gabrieleño Band of Mission Indians-Kizh Nation
P. O. Box 393
Covina, CA 91723
RE: Tribal Consultation Notification Pursuant to Assembly Bill 52; 1529 Virginia Avenue Project, Baldwin Park, California
Chair Salas:

This letter is to notify you of the proposed double faced digital billboard at 1529 Virginia Ave. (APN: 8558- 032-018), (Proposed Project) described below in the City of Baldwin Park (City), Los Angeles County, California. Pursuant to the California Environmental Quality Act (CEQA) and CEQA Guidelines, the City, as Lead Agency, has initiated preparation of an Initial Study/Mitigated Negative Declaration for the Proposed Project.

The subject property is located in an “Industrial Commercial” (I-C) Zone. The surrounding land uses and zoning consists of Industrial Commercial (I-C) to the north, west, and south, and Freeway Commercial (F- C) on the east of the subject property.

The proposed project has been tentatively approved by the City’s Design Review Committee and requires approval by the Planning Commission of the following entitlements:

1. Design Review for the billboard architecture and site design.

2. Development Agreement review for the
Your tribal group is invited to contact the City and participate in AB 52 consultation with the City pertaining to the Proposed Project. Please consider this letter and preliminary project information as the formal notification of the Proposed Project. The point of contact for the City is as follows.

Name/Title: Melissa Chipres, Associate Planner
Address: 14403 E. Pacific Ave
City and Zip Code: Baldwin Park, CA 91706
Telephone: 626.960.4011, ext. 452
Email: [email protected]
The City would appreciate receiving any comments, information or questions you may have regarding cultural places within the Proposed Project site. All information provided will be kept confidential.

Pursuant to Government Code Section 65352.3, please respond with 30 thirty days of the date of this letter if you would like to consult on the Proposed Project. Apart from consultation, please contact Melissa Chipres, Associate Planner, at 626.960.4011, ext. 452 if you would like to be notified of public hearings for the proposed project or if you have any questions or concerns with the proposed project.

Thank you for your involvement in this process and your attention to this matter.

Sincerely,
Melissa Chipres
Associate Planner
July 28, 2021
Mr. Joseph Ontiveros
Cultural Resource Director
Soboba Band of Luiseno Indians
P. O. Box 487
San Jacinto, CA 92581
RE: Tribal Consultation Notification Pursuant to Assembly Bill 52 ; 1529 Virginia Avenue Project, Baldwin Park, California
Chair Ontiveros:

This letter is to notify you of the proposed double faced digital billboard at 1529 Virginia Ave. (APN: 8558- 032-018), (Proposed Project) described below in the City of Baldwin Park (City), Los Angeles County, California. Pursuant to the California Environmental Quality Act (CEQA) and CEQA Guidelines, the City, as Lead Agency, has initiated preparation of an Initial Study/Mitigated Negative Declaration for the Proposed Project.

The subject property is located in an “Industrial Commercial” (I-C) Zone. The surrounding land uses and zoning consists of Industrial Commercial (I-C) to the north, west, and south, and Freeway Commercial (F- C) on the east of the subject property.

The proposed project has been tentatively approved by the City’s Design Review Committee and requires approval by the Planning Commission of the following entitlements:

1. Design Review for the billboard architecture and site design.

2. Development Agreement review for the
Your tribal group is invited to contact the City and participate in AB 52 consultation with the City pertaining to the Proposed Project. Please consider this letter and preliminary project information as the formal notification of the Proposed Project. The point of contact for the City is as follows.

Name/Title: Melissa Chipres, Associate Planner
Address: 14403 E. Pacific Ave
City and Zip Code: Baldwin Park, CA 91706
Telephone: 626.960.4011, ext. 452
Email: [email protected]
The City would appreciate receiving any comments, information or questions you may have regarding cultural places within the Proposed Project site. All information provided will be kept confidential.

Pursuant to Government Code Section 65352.3, please respond with 30 thirty days of the date of this letter if you would like to consult on the Proposed Project. Apart from consultation, please contact Melissa Chipres, Associate Planner, at 626.960.4011, ext. 452 if you would like to be notified of public hearings for the proposed project or if you have any questions or concerns with the proposed project.

Thank you for your involvement in this process and your attention to this matter.

Sincerely,
Melissa Chipres
Associate Planner
Vicinity Map
LOCATION: 1529 Virginia Avenue
CASE NUMBER: DA 19-03
DATE: June 1, 2022
AREA
MAP
Not to Scale
N
Subject
Property

ITEM NO. 11

STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Manuel Carrillo Jr., Director of Recreation & Community Services Sam Gutierrez, Director of Public Works
Ron Garcia, Acting Community Development Director
DATE: June 1, 2022
SUBJECT: Authorization to Accept Budget Allocation from Los Angeles Homeless Services Authority (LAHSA) for Operational Funding at Garvey Family Bridge Housing Site and Consideration for Approval of the Draft Site Layout Plan and Schematic Design

SUMMARY
The purpose of this staff report is to request authorization to accept a budget allocation in the amount of up to $821,250 from the Los Angeles Homeless Services Authority (LAHSA) for the operations at Garvey Family Bridge Housing and to approve the draft proposed site layout plan and schematic design for the site.

RECOMMENDATION
Staff recommends that the City Council:

1. Authorize to accept a budget allocation of up to $821,250 from LAHSA for the operations at Garvey Family Bridge Housing; and

2. Approve initial draft proposed site layout plan and schematic design; and

3. Authorize the Director of Public Works to move the project into the development phase and to coordinate with various entities in all elements as necessary to complete the construction improvements; and

4. Authorize the Director of Recreation and Community Services to submit notice to receive budget allocation to LAHSA and execute any necessary documents associated with the funding allocation; and

5. Authorize the Director of Finance to appropriate funding and make necessary changes to the budget.

FISCAL IMPACT
There is no fiscal impact to the General Fund at this time.

BACKGROUND
At their February 16, 2022, City Council meeting, the City Council approved the Agreement between the City of Baldwin Park and the San Gabriel Valley Regional Housing Trust (SGVRHT) to provide homeless housing and related services for homeless families at the City-owned property located at 13167 Garvey Avenue. The total capital grant award for the Homeless Housing Pilot Program (HHPP) is $1,125,000. The agreement does not include operational funding for the project. Therefore, City and SGVRHT staff has researched alternative funding options to support the project’s operational needs.

The office of LAHSA’s Interim Housing Division in its FY 22-23 budget allocations have identified interest to support the upcoming Garvey Family Bridge Housing Site Tiny Home Village for the operations of 50 beds/16 units of family bridge housing at the emergency non-congregate shelter. In accordance with LAHSA’s funding guidelines, the following requirements must be met to be eligible to receive the funds:
 Using LAHSA funds to assist homeless families as defined by U.S. Department of Housing and Urban Development (HUD). No Los Angeles County Office of Education (LACOE) definition of homelessness can be used for eligibility for these units  An agreed nexus to the City of Baldwin Park as (priority placement), but not exclusive to our City if units are not occupied with local residents  Housing First/Low Barrier (no background checks allowed)  Ability to service undocumented families
 $90 per unit per night ($10 more than the Cities and Council of Governments Interim Housing Services Funds)
 Funding Timeframe- July 1, 2022, through June 30, 2023 (we anticipate being operational in late September2022) staff will seek alternatives for gap funding from July 2022- September 2022.

Housing First Approach
A strategy to reduce homelessness in and around our cities is essentially a strategy to help people to move into homes. Over the years, the Housing First approach has emerged as the most successful and cost-effective way to accomplish this and has been adopted widely as a result. The goal of Housing First is to provide housing to individuals and families quickly with as few obstacles as possible. Applicants are not rejected on the basis of poor credit or financial history, poor or lack of rental history, criminal convictions unrelated to tenancy, or behaviors that indicate a lack of “housing readiness.” Housing First is considered a national evidence based best practice in ending homelessness.
 In 2016, California became a Housing First state
 LA County Board of Supervisors declared Los Angeles County a Housing First County  Service providers in LA County operate under a Housing First model United States Interagency Council on Homelessness (USICH) described the Housing First approach with the following core principles:

1. Homelessness is a housing crisis to be addressed through the provision of safe and affordable housing.

2. All people experiencing homelessness, regardless of their housing history and duration of homelessness, can achieve housing stability in permanent housing.

3. Everyone is “housing ready,”meaning that sobriety, compliance in treatment, or even a clean criminal history is not necessary to succeed in housing.

4. Many people experience improvements in overall quality of life and in the areas of health, mental health, substance use, and employment as a result of achieving housing.

5. People experiencing homelessness have the right to self-determination and should be treated with dignity and respect.

6. The exact configuration of housing and services depends upon the needs and preferences of the population.

If funding is approved, the City and SGVRHT will work collaboratively to issue a solicitation to request bids from homeless service providers. The results of this solicitation when ready will be brought back to the City Council for consideration.

In addition, at their February 16, 2022, City Council meeting, City Council authorized the Director of Community Development to prepare a site plan and schematic design for the housing development and, when ready, return at a subsequent City Council meeting for review, discussion, and direction thereof. The planning process began in earnest following City Council direction with staff ordering a topographical survey of the site.

Subsequently, staff has been actively working with SGVRHT and the planning and architectural firm, SRK Architects, in the development of the site layout and schematic design. Staff has coordinated closely with SRK through the schematic design process to ensure that it is in-line with the requirements of the HHPP grant and that it meets all integral components for the site with emphasis on the needs for future family residents. The goal is to complete construction of the first phase of the site and be operational in approximately four (4) months. In general, this phase will consist of the installation of modular units in the parking lot area of the site, along with trailer/portable bathrooms and buildings for laundry use.

The site draft layout plan and schematic design have now been finalized and are ready for presentation to the City Council for review, comments, and approval.

ALTERNATIVES
The alternative is not to accept a budget allocation in the amount of up to $821,250 from LAHSA for the operations at Garvey Family Bridge Housing and not approve initial proposed site layout plan and schematic design.

LEGAL REVIEW
None is required.

ATTACHMENTS

1. Draft Site Plan
W D

BALDWIN PARK, CA
PHASE 1

FAMILY TINY

HOME VILLAGE

GARVEY AVE
2254 South Figueroa Street
Los Angeles, CA. 90007
Tel. (213) 747-1199
www.srkarchtectsinc.com
©©
21007.03
ETAT
OO ILA
N
F
C-11258
RB
R
AI
AI
N
S
RENEWAL DATE:

ECI
08/31/23
C
E
AE
TI
F
TL
HCRDS A.N K
I
CET

NOT FOR

CONSTRUCTION
JH
HC

SITE PLAN
A-1.1
3/32" = 1'-0"
TRUE
NORTH
1PROPOSED SITE PLAN
3/32" = 1'-0"

SITE PLAN KEYNOTES
2254 South Figueroa Street
Los Angeles, CA 90007
213-749-1199
srkarchitectsinc.co m
TINY HOME VILLAGE Phase 1
family units and adaptive building reuse0 10’ 30’
Scale: 1” = 20’
W D

SK-3j
April 7, 2022
© 2022 SRK Architects Inc.
1 2
3 4
5 6
7 8 9 10 11
12 13
14 15
16 PHASE 2 PHASE 1 Site Concept
Site Section A-A
A
Converted Garage 758 sf
into Multi-purpose room
Main Entry to
Phase One
Shelter
< 150’ Fire
Access
New wood deck to facilitate ADAProposed ADA
Access
New ADA Ramp
from R.O.W.

ADA Units
Covered
Sand Box
16 Units =
50 Beds Max
Painted Floor in
playground motif
New Laundry &
Rest-room Trailers
Optional Pass-
thru door on
double unit
(optional roll
away crib)
Typ. 3 Bed Unit
(1 full size +
Twin bunk beds)

2254 South Figueroa Street
Los Angeles, CA 90007
213-749-1199
srkarchitectsinc.co m
TINY HOME VILLAGE Phase 1
family units and adaptive building reuse0 10’ 30’
Scale: 1” = 20’
W D
SK-3j
April 7, 2022

© 2022 SRK Architects Inc.
1 2
3 4
5 6
7 8 9 10 11
12 13
14 15
16 PHASE 2 PHASE 1 Site Concept
Site Section A-A
A
Converted Garage 758 sf
into Multi-purpose room
Main Entry to
Phase One
Shelter
< 150’ Fire
Access
New wood deck to facilitate ADAProposed ADA
Access
New ADA Ramp
from R.O.W.

ADA Units
Covered
Sand Box
16 Units =
50 Beds Max
Painted Floor in
playground motif
New Laundry &
Rest-room Trailers
Optional Pass-
thru door on
double unit
(optional roll
away crib)
Typ. 3 Bed Unit
(1 full size +
Twin bunk beds)
Site Schematic Concept
View of Site Concept
2254 South Figueroa Street
Los Angeles, CA 90007
213-749-1199
srkarchitectsinc.co m
TINY HOME VILLAGE Phase 1
family units and adaptive building reuse SK-3k
April 7, 2022
© 2022 SRK Architects Inc.

D R A F T

← All documents from this meeting