CITY COUNCIL
BALDWIN PARK
CHARITABLE RELIEF
FOUNDATION
REGULAR MEETING
Agenda
September 3, 2025, 7:00 PM
Mayor
Mayor Pro Tem
Councilmember
Councilmember
Councilmember
Alejandra Avila
Daniel Damian
Jean M. Ayala
Emmanuel J. Estrada
Manuel Lozano
Welcome to your City Council Meeting
We welcome your interest and involvement in the City’s legislative process. This agenda includes information about topics coming before the City Council and the action recommended by city staff. You can read about each topic in the staff reports, which are available on the city’s website and in the Office of the City Clerk.
Please note that, in the event of a technical issue causing a disruption in the call-in option or internet-based option, the meeting will continue unless otherwise required by law, such as when a Board Member is attending the meeting virtually pursuant to certain provisions of the Brown Act. Electronic devices are to be turned off while meetings are in session.
How to watch
The City of Baldwin Park provides two ways to watch a City Council meeting:
In Person
Most City Council meetings take place
at City Hall, 14403 E. Pacific Ave.,
Baldwin Park, CA 91706
Online
Audio streaming will be available at:
https://www.youtube.com/channel/UCFLZ0_dDFRjy59rhiDZ13Fg/featured?view_as=subscriber https://baldwinparkca.portal.civicclerk.com
Reasonable Accommodations
Individuals with disabilities may request an agenda packet in appropriate alternative formats as required by the Americans with Disability Act of 1990. Reasonable accommodations and auxiliary aids will be provided to effectively allow participation in the meeting. Please contact the City Clerk’s Office at (626) 960-4011.
Public Comments
The public is encouraged to address the City Council or any of its Agencies listed on this agenda on any matter posted on the agenda or on any other matter within its jurisdiction. In accordance with Chapter 39 of the Baldwin Park Municipal Code, Speakers must address the City Council as a whole and refrain from making impertinent, slanderous, or profane remarks or disrupt the peace of the meeting. Speaker cards are available at the podium and by request with the City Clerk.
Public Communication
There is a three-minute speaking time limit. This is the time set aside to address the City Council. Please notify the City Clerk if you require the services of an interpreter. No Action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. The legislative body or its staff may: 1) Briefly respond to statements made or questions asked by persons; or 2) Direct staff to investigate and/or schedule matters for consideration at a future meeting. [Government Code §54954.2] If you wish to comment on agenda items and are unable to physically appear in person, please email your name, place of residence, item number or to [email protected]. Written comments will be distributed and will be made part of the written record but will NOT be read verbally at the meeting.
Notice Regarding California Environmental Quality Act (CEQA) Determinations Pursuant to CEQA, a "project" is defined as a "whole action" subject to a public agency's discretionary funding or approval that has the potential to either (1) cause a direct physical change in the environment or (2) cause a reasonably foreseeable indirect physical change in the environment. "Projects" include discretionary activity by a public agency, a private activity that receives any public funding, or activities that involve the public agency's issuance of a discretionary approval and is not
statutorily or categorically exempt from CEQA. (Pub. Res. Code § 21065.) To the extent that matters listed in this Agenda are considered "projects" under CEQA, their appropriate CEQA determination will be listed below each recommendation. If no CEQA determination is listed, it has been determined that the action does not constitute a "project" under CEQA.
CALL TO ORDER
INVOCATION
PLEDGE OF ALLEGIANCE
ROLL CALL
REPORT FROM CLOSED SESSION
ANNOUNCEMENTS
The City Council are also members of the Board of Directors of the Baldwin Park Charitable Relief Foundation which are concurrently convening with the City Council this evening.
PROCLAMATIONS, COMMENDATIONS & PRESENTATIONS
Proclamation - 2025 National Suicide Prevention Week - September 7 - 13, 2025 presented to Adriana Avila from the American Foundation for Suicide Prevention.
Presentation - Certificate of Recognition to Baldwin Park & American Little League Girls Softball State Championship Participants
PUBLIC COMMUNICATIONS
CONSENT CALENDAR
All items listed are considered to be routine business by the City Council and will be approved with one motion. There will be no separate discussion of these items unless a City Councilmember so requests, in which case, the item will be removed from the general order of business and considered in its normal sequence on the agenda.
1. City of Baldwin Park’s Warrants and Demands
It is recommended that the City Council ratify the attached Warrants and Demands Register.
2. Meeting Minutes of August 20, 2025
It is recommended that the City Council approve the following meeting minutes of the Special City Council Meeting, Regular City Council Meeting, Finance Authority Meeting and the Housing Authority Meeting held on August 20, 2025.
3. Claim Rejection
It is recommended that the City Council reject the following claim and direct staff to send the appropriate notice of rejection to the claimant:
• Henry Saenz The claimant alleges bodily injury. • Gerardo Chavarria Gonzalez The claimant alleges property damages.
This government claim, and all government claims, should be considered as potential lawsuits in the future.
Thus, it is requested that all City Staff, the Mayor and all Council Members refrain from making any statements, whether public or private in nature. It is important that no statements be made so as to not prejudice this claim in any way which can happen if public or private comments are made about this claim by City staff or Council Members.
4. Approval of Appropriation of Prop A Funds to cover an unscheduled engine overhaul of one of the City's Fixed Route Buses, 2015 El Dorado E-Z Rider II Max Low Floor.
It is recommended that the City Council:
1. Approve the appropriation of $15,620.91 from Prop A Funds;
2. Authorize the Director of Finance to appropriate $15,620.91 from Fund #244 –Prop A and make necessary budget adjustments to cover the repairs; and
3. Authorize the Director of Public Works after the fact, or his designee, to complete all the proper documentation to process purchase requisition for purchase order for Nationwide Transit in the amount of $15,620.91 for the repair work to be completed.
5. Approval of Memorandum of Understanding with the Los Angeles County Metropolitan Transportation Authority (LACMTA) to Receive Proposition A Incentive Funds for Reporting Data to National Transit Database (NTD) for City Transit Services for Report Year 2022-2023 It is recommended that the City Council :
1. Approve the attached Memorandum of Understanding (MOU) with the Los Angeles County Metropolitan Transportation Authority (LACMTA) and authorize the Mayor to execute said agreement; and
2. Authorize the Director of Finance to accept the Proposition A Incentive Funds and make necessary budget adjustments related to this MOU.
6. Approval of Resolution 2025-033 to Approve the Revisions of the Engineering Manager and Community Service Officer Job Descriptions
It is recommended that the City Council approve and adopt Resolution 2025-033 to update the Engineering Manager and Community Service Officer job descriptions subject to any non-substantive changes made by the Chief Executive Officer and the City Attorney.
PUBLIC HEARING
REPORTS OF OFFICERS
7. Consideration to Approve Resolution No. 2025-032 Adopting a Mitigated Negative Declaration (MND) and Mitigation, Monitoring, and Reporting Program (MMRP) as well as the approval of the concept design for the Roadside Park Project
It is recommended that the City Council:
1. Adopt Resolution No. 2025-032 entitled, “A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK APPROVING AND ADOPTING (1) AN INITIAL STUDY
AND MITIGATED NEGATIVE DECLARATION AND MITIGATION MONITORING
AND REPORTING PROGRAM FOR THE BALDWIN PARK ROADSIDE PARK PROJECT LOCATED AT 1081 LEORITA ST.”
2. Authorize the Director of Recreation and Community Services to apply for grant funding for park improvements based on the conceptual improvements shown on the Site Plan and described in the IS/MND.
8. Approval of Employment Agreement with Maria Moreno for the position of Director of Recreation and Community Services
It is recommended that the City Council
1. Approve the Employment Agreement with Maria Moreno for the position of Director of Recreation and Community Services, subject to any non-substantive changes made by Chief Executive Officer
and the City Attorney, and subject to conditions precedent reflected in the agreement; and
2. Authorize the Mayor and City Clerk to execute an Employment Agreement with Maria Moreno.
CITY COUNCIL ACTING AS SUCCESSOR AGENCY OF THE DISSOLVED COMMUNITY
DEVELOPMENT COMMISSION
9. Successor Agency to The Dissolved Community Development Commission of The City of Baldwin Park Warrants and Demands
Staff recommends that the Board ratify the attached Warrants and Demands Register.
BALDWIN PARK CHARITABLE RELIEF FOUNDATION
10. Baldwin Park Charitable Relief Foundation Annual Financial Report For The Fiscal Year Ended June 30, 2025
It is recommended that the Board of Directors receives and files BPCRF’s Annual Financial Report for the fiscal year ending June 30, 2025.
CITY COUNCIL / CITY CLERK / CITY TREASURER / STAFF REQUESTS & COMMUNICATION
ADJOURNMENT
CERTIFICATION
I, Christopher Saenz, City Clerk of the City of Baldwin Park hereby certify that, under penalty of perjury under the laws of the State of California that the foregoing agenda was posted on the City Hall bulletin board not less than 72 hours prior to the meeting. Dated this 28th day of August 2025.
Christopher Saenz
City Clerk
For further information regarding agenda items, please contact the office of the City Clerk at (626) 960-4011 ext. 466 or via e-mail at [email protected]. In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the Public Works Department or Risk Management at (626) 960-4011. Notification 48 hours prior to the meeting will enable staff to make reasonable arrangements to ensure accessibility to this meeting. (28 CFR 34.102.104 ADA TITLE II)
ITEM NO: 1.
STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Manuel Carrillo Jr, Chief Executive Officer
Rose Tam, Finance Director
PREPARED BY: Ana Zhang, Senior Finance Clerk
DATE: September 3, 2025
SUBJECT: City of Baldwin Park’s Warrants and Demands
SUMMARY:
Attached is the Warrants and Demands Register for the City of Baldwin Park to be ratified by the City Council.
RECOMMENDED ACTION:
It is recommended that the City Council ratify the attached Warrants and Demands Register.
FISCAL IMPACT:
The payroll for the last period was $652,597.16 and the attached General Warrants Register was $1,146,907.73 for a total amount of $1,799,504.89.
BACKGROUND:
The attached Claims and Demands report format meet the required information as set out in the California Government Code. Staff has reviewed the requests for expenditures for the appropriate budgetary approval and for the authorization from the department head or its designee. Pursuant to Section 37208 of the California Government Code, the Chief Executive Officer or his/her designee does hereby certify to the accuracy of the demands hereinafter referred. Payments released since the previous City Council meeting and the following is a summary of the payment released:
1.The last payroll of the City of Baldwin Park consists of check numbers 203049 to 203063 Additionally, Automated Clearing House (ACH) Payroll deposits were made on behalf of City Employees from control number 56969 to 57275 for the period August 3, 2025, through August 16, 2025 inclusive; these are presented and hereby ratified in the amount of $652,597.16.
2.General Warrants, with the electronic fund transfer (EFT) bank drafts in the amount of $182,246.43 and checks from 252186 to 252389 in the amount of $964,661.30 for the period of August 11, 2025 to August 25, 2025, inclusive; in the total amount of $1,146,907.73 constituting of claims and demands against the City of Baldwin Park, are herewith presented to the City Council as required by law, and the same hereby ratified.
DISCUSSION:
None
ALTERNATIVES:
None
CEQA REVIEW:
None
LEGAL REVIEW:
This report does not require legal review.
ATTACHMENTS:
1. Check Register-9-3-2025
Amount
252220 08/11/2025 REGIONAL TAP SERVICE CENTER MAY 2025 POSITION SUMMARY 244-50-580-51100-15545 29.00$ 252221 08/11/2025 RICOH USA INC COPY OVERAGES FOR 8 RICOH COPIERS 12/1/24-5/31/25 401-10-141-51101-11502 510.98$ 252217 08/11/2025 PROFESSIONAL POLICE SUPPLY, INC SHOT SPONGE ROUND TRAINING KT 100-30-340-53100-00000 9.53$ 252218 08/11/2025 PROFORMA PRINTING & PROMOTIONAL PRODUCTS, INC. PARKING VIOLATION CITATION BOOKS 100-30-330-53320-00000 2,337.55$ 252219 08/11/2025 RAUL FLORES TRUSS & LIGHTING FOR STREET MARKET-M. PARK 6/12/25 100-60-610-53391-16101 3,500.00$ 252216 08/11/2025 PORSCHE CHAIYOT RUNGROTEVNICH AIRPORT PARKING-SPILLMAN TRAINING 5/12-5/15/2025 100-30-340-53100-00000 120.00$ 252217 08/11/2025 PROFESSIONAL POLICE SUPPLY, INC 15/EA DEFTECH #25 DISTRACTION DEVICE, 12-GRAM 100-30-340-53100-13040 673.72$ 252217 08/11/2025 PROFESSIONAL POLICE SUPPLY, INC 1/KIT 250 SHOT SPONGE ROUND TRAINING KIT 100-30-340-53100-00000 1,486.80$ 252213 08/11/2025 MARAVILLA FOUNDATION PERMIT REFUND 3233 SYRACUSE AV - BLDG-0125-4958 100-40-000-43400-00000 101.60$ 252214 08/11/2025 NICHOLS CONSULTING ENGINEERS, CHTD JUN 2025 SERVICES-CITY'S PAVEMENT MANAGEMENT 245-50-520-58100-55028 507.00$ 252215 08/11/2025 NORMAN A. TRAUB & ASSOCIATES BACKGROUND INVESTIGATION LT APPLICANT MILLER 100-30-340-51100-00000 2,457.70$ 252210 08/11/2025 JUAN CHAVEZ 5 GALLON OF ROCK PURSLANE, 5GALCORAL ALOE 251-50-560-53100-00000 332.78$ 252211 08/11/2025 LORENZO R SALLAS SOUND SVCS FOR STREET MARKET @ MORGAN PARK 6/12/25 100-60-610-53391-16101 3,859.00$ 252212 08/11/2025 LOS ANGELES COUNTY SHERIFFS DEPARTMENT HELICOPTER SERVICES 5/1-5/31/25 100-30-340-51100-00000 449.98$ 252209 08/11/2025 JOHN L HUNTER & ASSOCIATES INC APR 2025 CONSULTANT SERVICES FOR THE CITY'S NPDES 258-50-510-51100-15400 2,177.50$ 252209 08/11/2025 JOHN L HUNTER & ASSOCIATES INC MAY 2025 CONSULTANT SERVICES FOR THE CITY'S NPDES 258-50-510-51100-15400 1,631.25$ 252210 08/11/2025 JUAN CHAVEZ PLANTS AND TREES FOR LANDSCAPED AREAS 251-50-560-53100-00000 1,183.16$ 252208 08/11/2025 INDUSTRIAL CLEANING SYSTEMS, INC REPLACEMENT PARTS FOR POWER WASHER 100-60-620-53100-00000 604.62$ 252209 08/11/2025 JOHN L HUNTER & ASSOCIATES INC COMMERCIAL AND INDUSTRIAL INSPECTIONS 3/1-5/31/25 249-50-510-51100-15400 16,447.50$ 252209 08/11/2025 JOHN L HUNTER & ASSOCIATES INC MAR 2025 CONSULTANT SERVICES FOR THE CITY'S NPDES 258-50-510-51100-15400 947.50$ 252205 08/11/2025 GENTRY GENERAL ENGINEERING INC RESTORE THREE (3) SIDEWALKS DAMAGED DUE TO 254-50-551-51101-15705 9,566.51$ 252206 08/11/2025 GOODWILL INDUSTRIES OF SOUTHERN CALIFORNIA JUN 2025 NEXTGEN YOUTH EMPLOYMENT PROGRAM 275-25-719-51101-17518 28,534.13$ 252207 08/11/2025 GUSTAVO VASQUEZ REIM MATERIALS & SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 89.50$ 252204 08/11/2025 EVAN BROOKS ASSOCIATES, INC RFP DEV FOR TRANSIT SRVCS-BP THROUGH 3/31/2025 245-50-580-51100-15520 4,350.00$ 252204 08/11/2025 EVAN BROOKS ASSOCIATES, INC RFP DEV FOR TRANSIT SRVCS-BP TRHOUGH MARCH 31 2025 245-50-580-51100-15525 3,137.50$ 252205 08/11/2025 GENTRY GENERAL ENGINEERING INC RESTORE THREE (3) SIDEWALKS DAMAGED DUE TO 100-50-551-51101-60002 9,804.20$ 252201 08/11/2025 DEBRA L. REILLY, A PROFESSIONAL LAW CORPORATION BPPD INVESTIGATION - OFFICER VILLALOBOS 11/9/24 403-10-131-51102-00000 829.50$ 252202 08/11/2025 DONALD CHRISTOPHER LACHER BACKGROUND INVESTIGATION RECORDS SPC II 100-30-310-51100-00000 1,200.00$ 252203 08/11/2025 EL RINCON DEL SABOR POBLANO LLC CATERING FOR STREET MARKET IN THE PARK 06/19/2025 100-60-610-53100-16101 231.21$ 252199 08/11/2025 CONVERGEONE, INC. 1/EA VERKADA CB52-E OUTDOOR BULLET CAMERA, 275-30-765-58110-53005 10,918.27$ 252199 08/11/2025 CONVERGEONE, INC. FOR VERKADA CAMERAS, LARGE ARM MOUNT 100-30-340-53100-00000 8.59$ 252200 08/11/2025 DATA TICKET, INC. DATA TICKET JUNE 2025 ENTITY 0365 0705 100-40-460-51101-00000 100.00$ 252196 08/11/2025 CALIFORNIA BUILDING STANDARDS COMMISSION SPECIAL REVOLVING FUND(SB1473)-OCT-DEC 2024 100-40-000-43405-00000 406.80$ 252197 08/11/2025 CALIFORNIA BUILDING STANDARDS COMMISSION SPECIAL REVOLVING FUND(SB1473)-APR-JUN 2025 100-40-000-43405-00000 539.10$ 252198 08/11/2025 CARLA GUTIERREZ BALLOON INSTALLATION FOR PRIDE DAY MIXER 6/26/25 100-60-610-53100-16101 150.00$ 252193 08/11/2025 BOWMAN INFRASTRUCTURE ENGINEERS LTD MAR 2025 DESIGN SERVICES FOR TRAFFIC SIGNAL 256-50-520-58100-15564 15,205.00$ 252194 08/11/2025 CAL BLEND SOILS INC BOULDERS ASSORTED SIZES FOR MORGAN PARK 251-50-560-53100-00000 4,059.84$ 252195 08/11/2025 CALIFORNIA BUILDING STANDARDS COMMISSION SPECIAL REVOLVING FUND(SB1473)-JAN-MAR 2025 100-40-000-43405-00000 656.10$ 252191 08/11/2025 AXON ENTERPRISE, INC PERFORMANCE LICENSE 100-30-340-53100-00000 5,655.33$ 252191 08/11/2025 AXON ENTERPRISE, INC CRADLEPOINT FOR POLICE UNIT 100-30-340-53100-00000 493.07$ 252192 08/11/2025 BJ PARTY SUPPLIES LLC RENTAL STAGE FOR STREET MARKET IN THE PARK 6/19/25 501-60-000-22328-16101 1,930.00$ 252189 08/11/2025 AMERICAN SOCCER CO. INC JERSEYS FOR YOUTH SPORTS PROGRAM PRICE ADJ 4/29/25 501-60-000-22326-00000 (400.00)$ 252190 08/11/2025 APN LANDSCAPING INC REPLACE SPRINKLERS/INSTALL SHUT-OFF VALVE 6/29/25 245-50-562-53371-15537 850.00$ 252190 08/11/2025 APN LANDSCAPING INC REPLACE SPRINKLERS/INSTALL SHUT-OFF VALVE 6/30/25 245-50-562-53371-15537 1,900.00$ 252188 08/11/2025 AMERICAN PAPER PLASTIC SERVICES TRASH LINERS FOR PARK LANDSCAPE USE 251-50-571-53100-00000 1,003.22$ 252188 08/11/2025 AMERICAN PAPER PLASTIC SERVICES MATERIAL& SUPPLIES-TRASH LINERS-FOR ALL CITY PARKS 251-50-571-53100-00000 499.21$ 252189 08/11/2025 AMERICAN SOCCER CO. INC JERSEYS FOR YOUTH SPORTS STAR PROGRAM 501-60-000-22326-00000 1,790.85$ 252186 08/11/2025 AARDVARK TACTICAL INC SWAT GEAR FOR E. CAMACHO 100-30-340-53100-00000 4,818.76$ 252187 08/11/2025 AK TREADMILL REPAIR EXERCISE MACHINE REPAIRS IN CC WEIGHT ROOM 5/28/25 100-60-610-51100-00000 205.00$ 252188 08/11/2025 AMERICAN PAPER PLASTIC SERVICES TRASH LINERS FOR TRANSIT DIVISION USE 245-50-581-53100-15510 1,502.43$ Check Register
City of Baldwin Park, CA By (None)
Payment Dates 8/11/2025 - 8/25/2025
Payment Number Payment Date Vendor Name Description (Item) Account Number 1121 08/22/2025 BALDWIN PARK POA POLICE SWORN DUES 100-00-000-21219-00000 6,857.36$ 1121 08/22/2025 BALDWIN PARK POA POLICE NON-SWORN DUES 100-00-000-21219-00000 1,339.66$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 252241 08/11/2025 BMO BANK N.A. MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 190.34$ 252241 08/11/2025 BMO BANK N.A. MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 89.34$ 252241 08/11/2025 BMO BANK N.A. MONTHLY DROPBOX SUBS FOR BP NOW RENEWS 8/1/25 100-60-610-53330-00000 11.99$ 252241 08/11/2025 BMO BANK N.A. TRUCK RENTAL FOR IND DAY CELEB 7/2-7/4/25 100-60-610-53391-16145 595.80$ 252241 08/11/2025 BMO BANK N.A. WATER BOTTLES FOR CITY HALL 100-60-620-53100-00000 229.60$ 252241 08/11/2025 BMO BANK N.A. SG VALLEY NEWS SUBSCRIPTION RENEWS 8/23/25 100-60-610-53330-00000 26.00$ 252241 08/11/2025 BMO BANK N.A. SG VALLEY NEWS SUBSCRIPTION RENEWS 7/26/25 100-60-610-53330-00000 26.00$ 252241 08/11/2025 BMO BANK N.A. MONTHLY FEE CREATIVE CLOUD ALL APPS 7/10-8/9/25 100-60-610-53330-00000 89.99$ 252241 08/11/2025 BMO BANK N.A. CREDIT FOR ITEMS RETURNED FOR WALNUT CREEK PARK 100-60-610-53100-00000 (122.72)$ 252241 08/11/2025 BMO BANK N.A. SUPPLIES FOR THE STREET MARKET 100-60-610-53100-16101 126.92$ 252241 08/11/2025 BMO BANK N.A. SUPPLIES INDEPENDENCE DAY CELEBRATION 100-60-610-53100-16145 22.05$ 252241 08/11/2025 BMO BANK N.A. SUPPLIES FOR PETTING ZOO EVENT 100-60-610-53100-00000 43.85$ 252241 08/11/2025 BMO BANK N.A. FOAM BOARDS FOR PUBLIC INPUT MEETING 100-60-610-53100-00000 228.74$ 252241 08/11/2025 BMO BANK N.A. SUPPLIES FOR WALNUT CREEK NATURE PARK 100-60-610-53100-00000 191.05$ 252240 08/11/2025 BMO BANK N.A. FRAUD REVERSED NEXT MONTH 100-25-299-53370-00000 2.37$ 252240 08/11/2025 BMO BANK N.A. FLARES FOR P.D. 100-30-310-53100-00000 1,652.00$ 252240 08/11/2025 BMO BANK N.A. RETIREMENT CAKE FOR DISPATCHER SUPERVISOR 100-30-310-53100-00000 105.99$ 252238 08/11/2025 AT&T TOWER/AREA SEARCH RE:DR25-13712 7/7/2025 100-30-360-51101-00000 120.00$ 252239 08/11/2025 BJ PARTY SUPPLIES LLC RENTAL OF STAGE FOR STREET MARKET IN PARK 7/31/25 100-60-610-53391-16101 1,930.00$ 252240 08/11/2025 BMO BANK N.A. FRAUD REVERSED NEXT MONTH 100-25-299-53370-00000 0.04$ 252236 08/11/2025 AMERICAN EAGLE COMPUTER PROD INC. INK CARTRIDGES FOR SERGEANTS OFFICE 100-30-340-53100-00000 1,086.84$ 252236 08/11/2025 AMERICAN EAGLE COMPUTER PROD INC. INK CARTRIDGES FOR SERGEANTS OFFICE 100-30-340-53100-00000 1,072.62$ 252237 08/11/2025 AT&T ACT#34644-PHONE & WIRELESS SRVC 7/7-8/6/2025 100-30-310-53403-00000 48.17$ 252233 08/11/2025 YUNEX LLC REPLACE ILLUMINATED ST NAME SIGNS 3/18 &3/19/2025 245-50-550-51101-00000 9,900.00$ 252234 08/11/2025 ADLERHORST INTERNATIONAL LLC TRAINING FOR HOLGUIN & K9 KYRA 7/1/25-6/30/26 100-30-310-53200-00000 2,900.00$ 252235 08/11/2025 AK DIGITAL PRINTING BUSINESS CARDS FOR PLANNING - Y. CARMONA 100-40-440-53320-00000 73.40$ 252231 08/11/2025 WENDY HERNANDEZ MATERIALS & SUPPLIES FOR SENIOR CTR BINGO 110-60-630-58110-00000 141.36$ 252232 08/11/2025 WEST COAST ARBORISTS, INC MEDIUM SIZE MULCH TO ASSIST WITH WEEDB 6/30/2025 245-50-560-53100-00000 500.00$ 252233 08/11/2025 YUNEX LLC JUN 2025 CITY TRAFFIC SIGNALS AND STREET LIGHTS 240-50-530-51100-00000 1,965.05$ 252230 08/11/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES 245-50-560-53100-13401 88.62$ 252230 08/11/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES 245-50-560-53100-13401 318.87$ 252231 08/11/2025 WENDY HERNANDEZ MATERIALS & SUPPLIES-SR CTR BIRTHDAY CELEBRATION 100-60-630-53100-00000 95.22$ 252230 08/11/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES 245-50-560-53100-13401 388.57$ 252230 08/11/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES 245-50-560-53100-13401 94.62$ 252230 08/11/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES 245-50-560-53100-13401 290.51$ 252230 08/11/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES 245-50-560-53100-13401 88.62$ 252230 08/11/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES 245-50-560-53100-13401 363.63$ 252230 08/11/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES 245-50-560-53100-13401 91.62$ 252229 08/11/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 5/22-6/21/25 100-60-660-53403-00000 165.28$ 252229 08/11/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 5/22-6/21/25 100-60-680-53403-00000 104.50$ 252229 08/11/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 5/22-6/21/25 252-60-620-53403-00000 114.00$ 252228 08/11/2025 VCA ANIMAL HOSPITALS, INC. VET VISIT-FLEA MEDICATION FOR K9 KYRA 6/30/25 100-30-310-51101-17110 96.64$ 252229 08/11/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 5/22-6/21/25 100-60-620-53403-00000 301.26$ 252229 08/11/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 5/22-6/21/25 100-60-630-53403-00000 250.39$ 252228 08/11/2025 VCA ANIMAL HOSPITALS, INC. FOLLOW UP VISIT FOR CANINE KYRA 4/15/25 100-30-310-51101-00000 675.39$ 252228 08/11/2025 VCA ANIMAL HOSPITALS, INC. FOLLOW UP VISIT FOR CANINE KYRA 4/24/25 100-30-310-51101-00000 151.34$ 252228 08/11/2025 VCA ANIMAL HOSPITALS, INC. REASSES STITCHES FOR CANINE KYRA 4/28/25 100-30-310-51101-00000 61.68$ 252226 08/11/2025 SOUTHERN CALIFORNIA EDISON ELEC-CB-AUDITORIUM-14403 PACIFIC 6/9-7/9/25 100-60-620-53401-00000 6,679.55$ 252226 08/11/2025 SOUTHERN CALIFORNIA EDISON ELEC-CB-PUBLIC BLDGS-14403 PACIFIC 5/8-6/25/25 100-60-620-53401-00000 25,741.47$ 252227 08/11/2025 V & V MANUFACTURING REFURBISHING OF UNIFORMS & FLAT BADGES 6/19/25 100-30-320-53371-00000 1,141.80$ 252226 08/11/2025 SOUTHERN CALIFORNIA EDISON ELEC-RED CAR BLDG-14801 BADILLO 6/11-7/13/25 100-60-620-53401-00000 18.47$ 252226 08/11/2025 SOUTHERN CALIFORNIA EDISON ELEC-TRANSIT CENTER-3821 BOGART A 6/10-7/10/25 254-60-620-53401-15882 3,642.87$ 252226 08/11/2025 SOUTHERN CALIFORNIA EDISON ELEC-CNG-14747 1/2 RAMONA 6/10-7/10/25 100-60-620-53401-00000 5,493.56$ 252223 08/11/2025 RKA CONSULTING GROUP JUN 2025 PLAN CHECK SERVICES 100-50-510-51100-00000 2,695.00$ 252224 08/11/2025 SAN GABRIEL VALLEY WATER COMPANY WATER-121578-S. HOMES-13165 GARVEY 6/3-7/2/25 225-60-691-53402-66027 292.70$ 252225 08/11/2025 SCOTT RAPP PURCHASE SWAT UNIFORM FOR OFFICER 100-30-340-53100-13040 1,071.13$ 252222 08/11/2025 RICOH USA INC GROUP COLOR CHARGES 401-10-141-51101-11502 477.39$ 252223 08/11/2025 RKA CONSULTING GROUP MAY 2025 PLAN CHECK SERVICES 100-50-510-51100-00000 4,095.00$ 252221 08/11/2025 RICOH USA INC MAINTENANCE FOR 8 RICOH COPIERS 6/1-8/31/25 401-10-141-53371-11504 990.24$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 252276 08/11/2025 SINATRA UNIFORM INC UNIFORM REPLACEMENT FOR OFC. PIMENTEL 100-30-310-53100-00000 368.69$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR TEEN CENTER 100-60-660-53100-00000 40.20$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR PRIDE OF VALLEY 5K RUN 100-60-610-53100-16146 76.39$ 252273 08/11/2025 RAQUEL M. CERVANTES CASE# RID 1202591- NOE CERVANTES 100-00-000-21225-00000 115.39$ 252274 08/11/2025 RIO HONDO COMM. COLLEGE BASIC ACADEMY MOD I-PUBLIC SAFETY TRAINEES 7/17/25 100-30-310-53200-00000 3,568.50$ 252275 08/11/2025 SHI INTERNATIONAL CORP HP LASER JET PRO PRINTER FOR FAMILY SERVICE CENTER 100-60-640-53100-00000 570.85$ 252271 08/11/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-330-53100-00000 157.82$ 252271 08/11/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-300-53100-00000 548.41$ 252272 08/11/2025 PROFORMA PRINTING & PROMOTIONAL PRODUCTS, INC. FIELD PROPERTY RECEIPT BOOKS 100-30-330-53320-00000 627.11$ 252271 08/11/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-370-53100-00000 612.92$ 252271 08/11/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPIES FOR PD 100-30-370-53100-00000 193.47$ 252271 08/11/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-370-53100-00000 97.44$ 252268 08/11/2025 MICHAEL KELLY JULY 2025 TELEPHONE USAGE FOR INMATES IN JAIL 100-30-370-53403-00000 200.00$ 252269 08/11/2025 NATIONAL ASSOCIATION OF CHIEFS OF POLICE 12 MONTHS MEMBERSHIP FOR CHIEF LOPEZ 100-30-300-53330-00000 60.00$ 252270 08/11/2025 NORMAN A. TRAUB & ASSOCIATES BACKGROUND INVESTIGATION PST R. CABRERA 100-30-310-51100-00000 2,291.80$ 252265 08/11/2025 LOS ANGELES COUNTY SHERIFFS DEPARTMENT LEVYING OFFICER FILE#3302501060096-W.GARNISHMENT 100-00-000-21225-00000 142.40$ 252266 08/11/2025 LOS ANGELES REGIONAL FOOD BANK ASSORTED MEAL KITS FOR BP EMERGENCY RELIEF PROGRAM 100-60-610-53370-16166 140.00$ 252267 08/11/2025 MARISELA OCHOA REFUND-RENT DEP FOR ESTHER SNYDER CC POOL 7/26/25 501-60-000-22333-00000 150.00$ 252262 08/11/2025 JONATHAN AYALA REFUND-RENT DEP E.SNYDER CC POOL/MEET ROOM 7/27/25 501-60-000-22333-00000 300.00$ 252263 08/11/2025 KEYSTONE UNIFORMS PEPPER SPRAY FOR PD PERSONNEL 100-30-310-53100-00000 93.65$ 252264 08/11/2025 LC ACTION POLICE SUPPLY, LTD BEAN BAGS FOR PATROL 100-30-310-53100-00000 1,577.58$ 252259 08/11/2025 IMAGEN, INC. WRIST BANDS FOR SUMMER CAMP PARTICIPANTS 100-60-650-53100-00000 528.76$ 252260 08/11/2025 INSIGHT ANALYTICS CRIME ANALYSIS DASHBOARD & TRAINING SRVCS 100-30-360-51100-00000 3,750.00$ 252261 08/11/2025 IPERMIT LLC PERMIT REFUND 15019 NUBIA ST - BLDG-0725-6039 100-40-000-43400-00000 101.60$ 252256 08/11/2025 GUARDIAN ALLIANCE TECHNOLOGIES, INC. ONLINE SCREENING FOR PD APPLICANTS 100-30-310-51100-00000 270.00$ 252257 08/11/2025 HAPCOA LA MEMBERSHIP APPLICATION FOR CHIEF LOPEZ 2025 100-30-300-53330-00000 100.00$ 252258 08/11/2025 HDL, COREN & CONE SA-PROPERTY TAX JUL-SEP 2025 838-00-000-51100-14900 1,000.33$ 252253 08/11/2025 FRONTIER COMMUNICATIONS ACCT#1118215-INTERNET-7/19-8/18/25 225-60-690-53403-66027 141.18$ 252254 08/11/2025 GPS VEHICLE TRACKING SOLUTIONS ANNUAL RENEWAL OF SERVICE FOR GPS TRACKER 8/6/25 100-30-360-51100-00000 1,496.00$ 252255 08/11/2025 GRAFFITI TRACKER INC. GRAFFITI TRACKING SRVC-JUL 2025-JUN 2026 240-50-570-51101-15733 15,000.00$ 252251 08/11/2025 FORENSIC NURSE SPECIALIST, INC SEXUAL ASSAULT EXAMS 7/12-7/13/25 100-30-310-51100-00000 3,700.00$ 252252 08/11/2025 FRONTIER COMMUNICATIONS ACCT#507995-INTERNET-7/7-8/6/2025 100-30-310-53403-00000 106.64$ 252253 08/11/2025 FRONTIER COMMUNICATIONS ACCT#-INTERNET-7/19-8/18/25 100-60-620-53403-00000 4.80$ 252248 08/11/2025 CHRISTOPHER FLORES VIDEO PRODUCTION FOR PRIDE OF VALLEY 5K RUN 8/2/25 100-60-610-51101-16146 650.00$ 252249 08/11/2025 EAGLE PORTABLES INC PORTABLE RESTROOM RENTALS FOR 5K RUN 8/2/25 100-60-610-53391-16146 1,572.35$ 252250 08/11/2025 EMBLEMS INC. EXECUTIVE SECRETARY ROCKERS 100-30-310-53100-00000 195.50$ 252247 08/11/2025 CHICAS GRAPHICS AND DESIGN FULL COLOR BANNER FOR SUMMER DAY CAMP 100-60-650-53100-00000 121.55$ 252247 08/11/2025 CHICAS GRAPHICS AND DESIGN FULL COLOR BANNER FOR BARNES PARK 100-60-670-53100-15100 53.04$ 252247 08/11/2025 CHICAS GRAPHICS AND DESIGN PD NARCOTICS ENVELOPES FOR EVIDENCE 100-30-330-53320-00000 497.25$ 252244 08/11/2025 CALIFORNIA POLICE CHIEFS ASSOCIATION CPCA ASSOCIATE MEMBER DUES 7/1/25-6/30/26 100-30-300-53330-00000 170.00$ 252245 08/11/2025 CARLA GUTIERREZ BALLOON INST-YOUTH T-BALL OPEN CEREMONY 7/16/25 501-60-000-22326-00000 150.00$ 252246 08/11/2025 CHARTER COMMUNICATIONS DATA CONNECTION FOR RADIO SYSTEM 7/11-8/10/2025 100-30-310-53403-00000 395.60$ 252243 08/11/2025 BMO BANK N.A. CSMFO-SAN GABRIEL VALLEY CHAPTER MEETING 7/23/25 100-20-210-53350-00000 90.00$ 252243 08/11/2025 BMO BANK N.A. NEXT DAY FLYERS FOR INDEPENDENCE DAY 100-60-610-51101-16145 421.60$ 252243 08/11/2025 BMO BANK N.A. SUMMER CAMP @ DISCOVERY CUBE 501-60-000-22328-00000 445.00$ 252242 08/11/2025 BMO BANK N.A. ASSOCIATE ENGINEER INTERVIEW:PANEL PASTRIES 100-10-150-51101-11124 8.76$ 252243 08/11/2025 BMO BANK N.A. ELECTRIC BUG ZAPPER & KONIDEKE 6 PACK FOR FINANCE 100-20-210-53100-00000 53.01$ 252243 08/11/2025 BMO BANK N.A. NEW FISCAL YEAR STAFF MTG 100-20-210-53100-00000 120.81$ 252241 08/11/2025 BMO BANK N.A. HOTEL ACCOM BOXING TOURN IN TEMECULA 7/10/25 501-60-000-22328-16130 133.51$ 252242 08/11/2025 BMO BANK N.A. ENGINEERING ASSISTANT INTERVIEWS: PANEL LUNCH 100-10-150-51101-11124 43.49$ 252242 08/11/2025 BMO BANK N.A. ASSOCIATE ENGINEER INTERVIEWS: PANEL LUNCH 100-10-150-51101-11124 31.47$ 252241 08/11/2025 BMO BANK N.A. SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 42.84$ 252241 08/11/2025 BMO BANK N.A. PORTRAITS OF SENIOR CENTER PROM KING & QUEEN 501-60-000-22327-00000 70.00$ 252241 08/11/2025 BMO BANK N.A. HOTEL ACCOM BOXING TOURN IN TEMECULA 7/11-7/13/25 501-60-000-22328-16130 2,034.77$ 252241 08/11/2025 BMO BANK N.A. NETFLIX MONTHLY FEE-USAGE @ BARNES PARK 7/7-8/6/25 100-60-670-53330-15100 5.00$ 252241 08/11/2025 BMO BANK N.A. NETFLIX MONTHLY FEE-USAGE @ ARC 7/7-8/6/25 100-60-680-53330-00000 5.00$ 252241 08/11/2025 BMO BANK N.A. ANNUAL SUBSCRIPTION FOR CANVA SOFTWARE 100-60-630-53330-00000 149.90$ 252241 08/11/2025 BMO BANK N.A. NETFLIX MONTHLY FEE-USAGE @ TEEN CENTER 7/7-8/6/25 100-60-660-53330-00000 9.99$ 252241 08/11/2025 BMO BANK N.A. NETFLIX MONTHLY FEE-USAGE @ SENIOR CNTR 7/7-8/6/25 100-60-630-53330-00000 5.00$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 252293 08/14/2025 RIO HONDO COMM. COLLEGE DRIVER TRAINING COURSE 8/21/2025-ANTHONY P. 100-30-310-53200-00000 25.00$ 252293 08/14/2025 RIO HONDO COMM. COLLEGE DRIVER TRAINING COURSE 8/21/2025-AARON N. 100-30-310-53200-00000 25.00$ 252293 08/14/2025 RIO HONDO COMM. COLLEGE DRIVER TRAINING COURSE 8/21/2025-BRIAN M. 100-30-310-53200-00000 25.00$ 252291 08/14/2025 FRONTIER COMMUNICATIONS ACT#923225-INTERNET-S.HOMES 7/23-8/22/2025 100-60-620-53403-55003 4.80$ 252291 08/14/2025 FRONTIER COMMUNICATIONS ACT#923225-INTERNET-S.HOMES 7/23-8/22/2025 225-60-691-53403-66027 245.18$ 252292 08/14/2025 GUADALUPE RODRIGUEZ COMPUTER LOAN-6 MONTHS 100-00-000-11031-00000 1,349.25$ 252288 08/11/2025 SOUTHLAND TRANSIT, INC. FAREBOX REVENUE-BP JUNE 2025 244-50-000-42151-00000 (208.00)$ 252289 08/14/2025 CALIFORNIA CONSULTING, INC. JUL 2025 GRANT WRITING SERVICE 100-25-299-51100-17000 4,500.00$ 252290 08/14/2025 CORODATA RECORDS MANAGEMENT, INC. JULY 2025 CITY CLERK OFFICE STORAGE 100-10-120-51101-11431 64.61$ 252288 08/11/2025 SOUTHLAND TRANSIT, INC. FUEL COST-BP JUNE 2025 244-50-580-51100-15525 1,411.75$ 252288 08/11/2025 SOUTHLAND TRANSIT, INC. FUEL COST-BP JUNE 2025 245-50-580-51100-15525 2,801.97$ 252288 08/11/2025 SOUTHLAND TRANSIT, INC. DIAL-RIDE SERVICES-BP JUNE 2025 245-50-580-51100-15520 29,491.89$ 252288 08/11/2025 SOUTHLAND TRANSIT, INC. FIXED ROUTE SERVICES-BP JUNE 2025 244-50-580-51100-15525 91,030.22$ 252288 08/11/2025 SOUTHLAND TRANSIT, INC. FIXED ROUTE SERVICES-BP JUNE 2025 244-50-580-51100-15525 8,317.86$ 252288 08/11/2025 SOUTHLAND TRANSIT, INC. FAREBOX REVENUE-BP JUNE 2025 244-50-000-42151-00000 (2,935.50)$ 252286 08/11/2025 VERIZON WIRELESS PHONE-870914792-00017-CITY CLERK 6/22-7/21/25 100-10-120-53403-00000 38.34$ 252287 08/11/2025 VERIZON WIRELESS PHONE-870914792-00010-HOUSING 6/22-7/21/25 100-40-405-53403-00000 50.78$ 252287 08/11/2025 VERIZON WIRELESS PHONE-870914792-00010-HOUSING 6/22-7/21/25 220-40-420-53403-14700 50.78$ 252285 08/11/2025 US BANK TECHNOLOGY TOOLS, SCREWS, AND MOUNTS 401-10-140-53390-00000 67.58$ 252285 08/11/2025 US BANK SHIPPING SCALE 401-10-140-53390-00000 47.50$ 252285 08/11/2025 US BANK ROLLER CART REPLACEMENTS 401-10-141-53390-00000 237.49$ 252285 08/11/2025 US BANK ROLLER CART REPLACEMENTS 401-10-140-53390-00000 165.74$ 252285 08/11/2025 US BANK TECHNOLOGY TOOLS, SCREWS, AND MOUNTS 401-10-140-53390-00000 147.61$ 252285 08/11/2025 US BANK TOOLS AND CONTAINERS 401-10-140-53390-00000 109.40$ 252285 08/11/2025 US BANK CREDIT FOR CANCELLED ORDER 401-10-140-53390-00000 (61.80)$ 252285 08/11/2025 US BANK TOOLS AND CONTAINERS 401-10-140-53390-00000 108.07$ 252285 08/11/2025 US BANK IMPACT BIT SET 401-10-140-53390-00000 53.01$ 252285 08/11/2025 US BANK WEBINAR 500 MONTHLY SUBSCRIPTION 7/16-8/15/25 401-10-140-53370-11602 49.44$ 252285 08/11/2025 US BANK DUO ESSENTIALS MONTHLY 7/23-8/23/25 401-10-140-53370-11602 210.00$ 252285 08/11/2025 US BANK DELL USB FLOPPY DISK DRIVE 401-10-140-53390-00000 38.02$ 252285 08/11/2025 US BANK DMV TRANSFER OF TITLE 402-50-590-53370-00000 109.00$ 252285 08/11/2025 US BANK DMV TRANSFER OF TITLE 402-50-590-53370-00000 138.00$ 252285 08/11/2025 US BANK DESKTOP FOR BAC BUSINESS EDITION 401-10-140-53330-00000 149.99$ 252285 08/11/2025 US BANK DMV TRANSFER OF TITLE 402-50-590-53370-00000 138.00$ 252285 08/11/2025 US BANK DMV SERVICE FEE 402-50-590-53370-00000 2.90$ 252285 08/11/2025 US BANK DMV SERVICE FEE 402-50-590-53370-00000 2.90$ 252283 08/11/2025 T-MOBILE PHONE-GPS TRACKING 7/17-8/16/25 100-30-360-51101-00000 115.00$ 252284 08/11/2025 T-MOBILE PHONE-GPS TRACKING 7/11-8/8/25 100-30-360-51101-00000 115.00$ 252285 08/11/2025 US BANK DMV SERVICE FEE 402-50-590-53370-00000 2.29$ 252280 08/11/2025 STERICYCLE, INC. AUGUST 2025 COLLECTION OF BIOHAZARD MATERIALS 100-30-360-53100-00000 85.83$ 252281 08/11/2025 THE SAUCE CREATIVE SERVICES CORP FLYER DESIGN FOR THE PRIDE OF THE VALLEY 5K RUN 100-60-610-51101-16146 450.00$ 252282 08/11/2025 THE SHREDDERS DESTRUCTION OF PD CONFIDENTIAL DOCUMENTS 100-30-330-51101-00000 349.00$ 252279 08/11/2025 SOUTHERN CALIFORNIA EDISON ELEC-SERENITY HOMES-13167 GARVEY 6/19-7/21/25 100-60-620-53401-00000 2.74$ 252279 08/11/2025 SOUTHERN CALIFORNIA EDISON ELEC-SERENITY HOMES-13167 GARVEY 6/19-7/21/25 225-60-691-53370-66027 728.85$ 252280 08/11/2025 STERICYCLE, INC. JULY 2025 COLLECTION OF BIOHAZARD MATERIALS 100-30-360-53100-00000 85.83$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 228.02$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR PETTING ZOO EVENT 100-60-610-53100-00000 28.71$ 252278 08/11/2025 SO CAL SANITATION PORTABLE RESTROOM & WASHING STATION RENTALS 7/2/25 100-60-610-53391-16145 1,977.95$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR PETTING ZOO EVENT 100-60-610-53100-00000 61.80$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR PETTING ZOO EVENT 100-60-610-53100-00000 155.46$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR CITY HALL 100-60-620-53100-00000 229.60$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR STREET MARKET 100-60-610-53100-16101 71.12$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 36.18$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 40.87$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SUMMER CONCERTS 100-60-610-53100-16101 99.92$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 131.67$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 174.11$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SUMMER SPLASH 100-60-610-53100-00000 140.66$ 252277 08/11/2025 SMART & FINAL MATERIALS & SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 89.00$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 501-60-000-22327-00000 20.26$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 100-60-640-53100-00000 71.00$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 100-60-660-53100-00000 26.47$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 110-60-685-53100-00000 72.98$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 501-60-000-22328-00000 93.01$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 501-60-000-22328-00000 93.92$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 501-60-000-22328-00000 39.05$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 501-60-000-22327-00000 7.91$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 501-60-000-22328-00000 7.91$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 501-60-000-22328-00000 51.45$ 252306 08/19/2025 CALIFORNIA CONSULTING, INC. JUN 2025 GRANT WRITING SERVICES 100-25-299-51100-17000 4,500.00$ 252307 08/19/2025 CHICAS GRAPHICS AND DESIGN MISCELLANEOUS SIGNS 251-50-550-53100-00000 77.18$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 100-60-660-53100-00000 51.47$ 252303 08/19/2025 AVANT-GARDE INC HUD 5-YEAR CON PLAN, FIRST YEAR ANNUAL PLAN 220-40-420-51101-14700 2,660.00$ 252304 08/19/2025 BALDWIN PARK INVESTMENTS, INC. CAR WASH FOR VEHICLES 6/1-6/30/2025 402-50-591-51101-00000 946.00$ 252305 08/19/2025 BERLITZ LANGUAGES, INC. MAR 2025 - 3 BILINGUAL TESTS - SPANISH 100-10-150-51101-00000 180.00$ 252300 08/19/2025 AMERICAN HOME REMODELING INC PERMIT REFUND:13704 MONTEREY AVE-BLD 0325-5265 100-40-000-43400-00000 84.00$ 252301 08/19/2025 ASPLUNDH CONSTRUCTION REFUND C&D 1011 BALDWIN PARK BLDG-0124-3137 246-00-000-22540-00000 15,000.00$ 252302 08/19/2025 AUL HEALTH BENEFIT TRUST 1Q25 ADMINISTRATION FEE (ER) 100-10-150-51101-00000 3,045.00$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-BKK WEST COVINA CLASS 1 LANDFILL (SOLE) 403-10-160-51102-00000 1,303.40$ 252299 08/19/2025 ALEJANDRO CASASOLA REFUND C&D 4952 ELIZABETH ST. BLDG-0224-3414 246-00-000-22540-00000 300.00$ 252299 08/19/2025 ALEJANDRO CASASOLA REFUND C&D 4952 ELIZABETH ST.BLDG-0224-3415 246-00-000-22540-00000 393.00$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-ZOCALO PARK PROJECT 403-10-130-51102-00000 5,555.80$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-ADMINISTRATION/CITY COUNCIL 100-10-130-51102-11102 1,749.63$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025- PUBLIC RECORDS ACT/HANDLED BY ARC (PRA) 100-10-130-51102-11060 3,182.40$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-PERSONNEL MATTER 403-10-150-51102-00000 275.00$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-PERSONNEL MATTER 403-10-150-51102-00000 137.50$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-PERSONNEL MATTER 403-10-150-51102-00000 330.00$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-MARTINEZ 403-10-130-51102-00000 55.00$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-VARIOUS LITIGATION UPDATE 403-10-130-51102-00000 550.00$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-PERSONNEL MATTER 403-10-150-51102-00000 165.00$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-PITCHES MATTERS 100-30-130-51102-13405 3,275.60$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-GOV CLAIMS & LITIGATION MGMT CITY PORTION 100-10-130-51102-11102 3,106.40$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-CANNABIS (K8) 237-40-130-51102-14070 137.50$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-PARKS AND RECREATION 100-60-130-51102-16175 385.00$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025- COUNCIL MEETINGS AND OFFICE HOURS 100-10-130-51102-11102 7,930.33$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-HUMAN RESOURCES 100-10-130-51102-11103 247.50$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-BKK CLASS 1 LANDFILL (SHARED) 403-10-160-51102-00000 2,900.21$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-COMMUNITY DEVELOPMENT 100-40-130-51102-14200 5,967.50$ 252298 08/14/2025 BEST BEST & KRIEGER LLP JUN 2025-BESS AVE 100-40-130-51102-14200 137.20$ 252297 08/14/2025 VALLEY COUNTY WATER DIST WATER-2842887102-CB-15010 BADILLO 6/23-7/23/25 100-60-620-53402-00000 205.97$ 252297 08/14/2025 VALLEY COUNTY WATER DIST WATER-2842887202-CB-15010 BADILLO 6/23-7/23/25 100-60-620-53402-00000 205.97$ 252297 08/14/2025 VALLEY COUNTY WATER DIST WATER-2838010300-EV-14173 GARVEY 6/23-7/22/25 225-60-690-53402-66027 185.04$ 252297 08/14/2025 VALLEY COUNTY WATER DIST WATER-2832814300-CB-15010 BADILLO 6/23-7/22/25 100-60-620-53402-00000 640.58$ 252297 08/14/2025 VALLEY COUNTY WATER DIST WATER-2832816700-CB-14403 PACIFIC 6/23-7/22/25 100-60-620-53402-00000 1,345.84$ 252297 08/14/2025 VALLEY COUNTY WATER DIST WATER-2842833100-CB-14403 PACIFIC 6/23-7/23/25 100-60-620-53402-00000 200.97$ 252296 08/14/2025 SOUTHERN CALIFORNIA GAS CO GAS-69003-CITY BLDG-13135 GARVEY 6/26-7/28/25 100-60-620-53400-00000 26.74$ 252297 08/14/2025 VALLEY COUNTY WATER DIST WATER-2810541301-CB-14305 MORGAN 6/23-7/22/25 100-60-620-53402-00000 139.17$ 252297 08/14/2025 VALLEY COUNTY WATER DIST WATER-2810541401-CB-14305 MORGAN 6/23-7/22/25 100-60-620-53402-00000 127.07$ 252296 08/14/2025 SOUTHERN CALIFORNIA GAS CO GAS-41005-CITY PARK-14255 RAMONA 6/25-7/25/25 252-60-620-53400-00000 2,479.09$ 252296 08/14/2025 SOUTHERN CALIFORNIA GAS CO GAS-42004-CITY BLDG-14403 PACIFIC 6/27-7/29/25 100-60-620-53400-00000 368.92$ 252296 08/14/2025 SOUTHERN CALIFORNIA GAS CO GAS-65704-CITY BLDG-15010 BADILLO 6/27-7/29/25 100-60-620-53400-00000 108.88$ 252296 08/14/2025 SOUTHERN CALIFORNIA GAS CO GAS-34832-CITY BLDG-14403 PACIFIC 6/27-7/29/25 100-60-620-53400-00000 219.60$ 252296 08/14/2025 SOUTHERN CALIFORNIA GAS CO GAS-36006-CITY BLDG-14305 MORGAN 6/25-7/25/25 100-60-620-53400-00000 60.77$ 252295 08/14/2025 SOUTHERN CALIFORNIA EDISON ELEC-SERENITY HOMES-13169 GARVEY 6/19-7/21/25 225-60-691-53370-66027 1,896.74$ 252296 08/14/2025 SOUTHERN CALIFORNIA GAS CO GAS-31292-CITY PARK-1209 VINELAND 6/23-7/23/25 252-60-620-53400-00000 21.99$ 252293 08/14/2025 RIO HONDO COMM. COLLEGE DRIVER TRAINING COURSE 8/21/2025-DANIEL V. 100-30-310-53200-00000 25.00$ 252294 08/14/2025 SAN GABRIEL VALLEY EXAMINER BPGO1 ORDINANCE NO:1518 100-10-120-53330-00000 186.00$ 252295 08/14/2025 SOUTHERN CALIFORNIA EDISON ELEC-SERENITY HOMES-13169 GARVEY 6/19-7/21/25 100-60-620-53401-00000 7.17$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 252328 08/19/2025 MERRIMAC ENERGY GROUP REGULAR UNLEADED GASOLINE FOR ALL CITY VEHICLES 402-50-590-53110-16140 5,171.49$ 252327 08/19/2025 LOS ANGELES COUNTY PUBLIC WORKS MAR 2025 CITY OF BALDWIN PARK SSMP AUDIT 240-50-510-51100-15400 5,843.24$ 252328 08/19/2025 MERRIMAC ENERGY GROUP REGULAR UNLEADED GASOLINE FOR ALL CITY VEHICLES 402-50-590-53110-16140 5,164.07$ 252328 08/19/2025 MERRIMAC ENERGY GROUP REGULAR UNLEADED GASOLINE FOR ALL CITY VEHICLES 402-50-591-53110-16140 13,134.96$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE JUN 2025-LEGAL SRVC-BA020-00160 403-10-131-51102-00000 627.90$ 252325 08/19/2025 LORENZO R SALLAS SOUND SERVICES FOR STREET MARKET 6/19/25 100-60-610-51100-16101 3,859.00$ 252326 08/19/2025 LORRAINE MENDEZ HUD ADMINISTRATION FOR JUN 2025 220-40-420-51101-14700 1,040.00$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE MAY 2025-LEGAL SRVC-BA020-00146 403-10-131-51102-00000 2,056.56$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE MAY 2025-LEGAL SRVC-BA020-00001 403-10-131-51102-00000 2,276.00$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE JUN 2025-LEGAL SRVC-BA020-00170 403-10-131-51102-00000 59.00$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE MAY 2025-LEGAL SRVC-BA020-00174 403-10-131-51102-00000 2,762.50$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE MAY 2025-LEGAL SRVC-BA020-00171 403-10-131-51102-00000 1,420.50$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE MAY 2025-LEGAL SRVC-BA020-00170 403-10-131-51102-00000 72.50$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE APR 2025-LEGAL SRVC-BA020-00159 403-10-131-51102-00000 161.00$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE APR 2025-LEGAL SRVC-BA020-00146 403-10-131-51102-00000 4,479.10$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE APR 2025-LEGAL SRVC-BA020-00001 403-10-131-51102-00000 1,240.00$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE APR 2025-LEGAL SRVC-BA020-00172 403-10-131-51102-00000 995.50$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE APR 2025-LEGAL SRVC-BA020-00171 403-10-131-51102-00000 2,313.00$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE APR 2025-LEGAL SRVC-BA020-00170 403-10-131-51102-00000 72.50$ 252323 08/19/2025 LEWIS ENGRAVING INC PLATE NAMES FOR CITY COUNCIL 100-60-620-53100-00000 69.62$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE APR 2025-LEGAL SRVC-BA020-00175 403-10-131-51102-00000 118.00$ 252324 08/19/2025 LIEBERT CASSIDY WHITMORE APR 2025-LEGAL SRVC-BA020-00174 403-10-131-51102-00000 2,577.00$ 252322 08/19/2025 LA CANADA DESIGN GROUP INC APR 2025 CONSTRUCTION ADMINISTRATION SERVICES 256-50-520-58100-55022 2,932.50$ 252322 08/19/2025 LA CANADA DESIGN GROUP INC ARCHITECTURAL& ENGR. DESIGN SVC 7/1/2024-4/30/2025 200-50-520-58100-55022 435.00$ 252323 08/19/2025 LEWIS ENGRAVING INC PLATE NAMES FOR CITY COUNCIL & PARKING SIGNS 100-60-620-53100-00000 173.49$ 252320 08/19/2025 KINGDOM CAUSES, INC. APR 2025 OPERATIONAL COST S. HOMES - PLHA 225-60-691-53370-66027 10,266.52$ 252320 08/19/2025 KINGDOM CAUSES, INC. MAY 2025 OPERATIONAL COST S. HOMES - PLHA 225-60-691-53370-66027 6,374.55$ 252321 08/19/2025 KNIGHT CLAREMONT INC. TUBE FUEL 402-50-591-53100-00000 255.99$ 252320 08/19/2025 KINGDOM CAUSES, INC. APR 2025 OPERATIONAL COST S. HOMES - GEN 100-60-691-53370-00000 1,416.24$ 252320 08/19/2025 KINGDOM CAUSES, INC. APR 2025 OPERATIONAL COST S. HOMES - PLHA 225-60-691-53370-66027 2,347.26$ 252320 08/19/2025 KINGDOM CAUSES, INC. APR 2025 OPERATIONAL COST S. HOMES - GEN 100-60-691-53370-00000 85.96$ 252320 08/19/2025 KINGDOM CAUSES, INC. JAN 2025 OPERATIONAL COST S. HOMES - PLHA 225-60-691-53370-66027 1,913.47$ 252320 08/19/2025 KINGDOM CAUSES, INC. JAN 2025 OPERATIONAL COST S. HOMES - PLHA 225-60-691-53370-66027 10,050.54$ 252320 08/19/2025 KINGDOM CAUSES, INC. MAR 2025 OPERATIONAL COST S.HOMES-HILDA SOLIS 270-60-691-53370-66028 70,801.59$ 252318 08/19/2025 JOHN L HUNTER & ASSOCIATES INC JUN 2025 CONSULTANT SERVICES FOR THE CITY'S NPDES 258-50-510-51100-15400 2,005.00$ 252319 08/19/2025 JON'S FLAGS & POLES INC. FLAGS FOR CITY FACILITIES 100-60-620-53100-00000 667.95$ 252320 08/19/2025 KINGDOM CAUSES, INC. JAN 2025 OPERATIONAL COST S. HOMES - GEN 100-60-691-53370-00000 18,935.44$ 252316 08/19/2025 HOME DEPOT MATERIAL & SUPPLIES FOR FLEET DIVISION 402-50-590-53100-00000 131.50$ 252316 08/19/2025 HOME DEPOT MATERIAL & SUPPLIES FOR FLEET DIVISION 402-50-590-53100-00000 8.22$ 252317 08/19/2025 JL GROUP, LLC MATTER: POLICE USE OF FORCE 403-10-131-51102-00000 8,647.98$ 252315 08/19/2025 HOME DEPOT MATERIAL&SUPPLIES FOR BLDG MAINT 100-60-620-53100-00000 559.12$ 252315 08/19/2025 HOME DEPOT MATERIAL&SUPPLIES FOR BLDG MAINT 100-60-620-53100-00000 53.92$ 252315 08/19/2025 HOME DEPOT MATERIAL&SUPPLIES FOR BLDG MAINT 100-60-620-53100-00000 239.20$ 252315 08/19/2025 HOME DEPOT MATERIAL&SUPPLIES FOR BLDG MAINT 100-60-620-53100-00000 73.59$ 252315 08/19/2025 HOME DEPOT MATERIAL&SUPPLIES FOR BLDG MAINT 100-60-620-53100-00000 27.54$ 252315 08/19/2025 HOME DEPOT MATERIAL&SUPPLIES FOR BLDG MAINT 100-60-620-53100-00000 45.16$ 252313 08/19/2025 GLENN B DORNING, INC. MATERIAL&SUPPLIES FILTER AND OIL FOR THE KUBOTA 402-50-590-53100-00000 350.08$ 252314 08/19/2025 GRAINGER, INC. MATERIAL & SUPPLIES-CHARGER BASE, STREAMLIGHT 402-50-590-53100-00000 199.20$ 252315 08/19/2025 HOME DEPOT CREDIT MEMO FOR MATERIAL&SUPPLIES FOR BLDG MAINT 100-60-620-53100-00000 (6.14)$ 252311 08/19/2025 EZEQUIEL CONTRERAS TAE KWON DO INSTRUCTOR 6/9-7/3/25 501-60-000-22328-00000 1,228.50$ 252312 08/19/2025 FM BODY & CLASSIC RESTORATION, INC HEADLIGHTS FOR PW UNIT CNG #3 402-50-590-53100-00000 862.88$ 252312 08/19/2025 FM BODY & CLASSIC RESTORATION, INC HEADLIGHTS FOR PW TRAIL BLAZER 402-50-590-53100-00000 621.81$ 252309 08/19/2025 DOOLEY ENTERPRISES, INC. AMMO FOR PATROL 100-30-340-53100-00000 17,396.78$ 252310 08/19/2025 DREAM PAINTING INC PAINTING OF CC ENTRANCE & DISPLAY CASE 252-60-620-53371-00000 2,025.00$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 501-60-000-22328-00000 85.56$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 501-60-000-22328-00000 27.40$ 252309 08/19/2025 DOOLEY ENTERPRISES, INC. AMMO FOR PATROL 100-30-340-53100-00000 19,097.07$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 501-60-000-22328-00000 95.52$ 252308 08/19/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR RECREATION DEPARTMENT 501-60-000-22328-00000 29.62$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 252350 08/19/2025 WAXIE SANITARY SUPPLY JANITORIAL SUPPLIES FOR CITY FACILITIES 100-60-620-53100-00000 314.80$ 252350 08/19/2025 WAXIE SANITARY SUPPLY JANITORIAL SUPPLIES FOR CITY FACILITIES 252-60-620-53100-00000 1,847.46$ 252350 08/19/2025 WAXIE SANITARY SUPPLY MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 140.25$ 252350 08/19/2025 WAXIE SANITARY SUPPLY MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 1,243.91$ 252350 08/19/2025 WAXIE SANITARY SUPPLY JANITORIAL SUPPLIES FOR CITY FACILITIES 100-60-620-53100-00000 261.30$ 252350 08/19/2025 WAXIE SANITARY SUPPLY MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 209.97$ 252350 08/19/2025 WAXIE SANITARY SUPPLY MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 701.23$ 252350 08/19/2025 WAXIE SANITARY SUPPLY MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 2,414.43$ 252349 08/19/2025 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 100-60-620-53100-00000 68.07$ 252349 08/19/2025 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 100-60-620-53100-00000 39.45$ 252350 08/19/2025 WAXIE SANITARY SUPPLY MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 4,377.87$ 252348 08/19/2025 UNITED PUMPING SERVICE INC FRONT CLARIFIER AT CITY YARD & RESIDENTIAL SPILL 245-50-551-51101-15705 853.50$ 252349 08/19/2025 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 100-60-620-53100-00000 18.90$ 252349 08/19/2025 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 100-60-620-53100-00000 145.62$ 252346 08/19/2025 TRIPEPI,SMITH AND ASSOCIATES, INC JUN 2025 PROGRAMMING AND COMMUNITY OUTREACH 270-50-520-58100-15093 753.75$ 252347 08/19/2025 TWO WAY DIRECT WALKIE TALKIES FOR SUMMER LUNCH PROGRAM 100-60-610-53100-17505 4,357.44$ 252348 08/19/2025 UNITED PUMPING SERVICE INC FRONT CLARIFIER AT CITY YARD & RESIDENTIAL SPILL 402-50-590-51100-00000 1,880.90$ 252345 08/19/2025 THE SAUCE CREATIVE SERVICES CORP SUMMER/FALL REC GUIDE DESIGN & SPANISH TRANSLATION 100-60-670-51100-15100 1,000.00$ 252345 08/19/2025 THE SAUCE CREATIVE SERVICES CORP SUMMER/FALL REC GUIDE DESIGN & SPANISH TRANSLATION 501-60-000-22328-16146 4,160.00$ 252346 08/19/2025 TRIPEPI,SMITH AND ASSOCIATES, INC APR 2025 PROGRAMMING AND COMMUNITY OUTREACH 270-50-520-58100-15093 321.25$ 252345 08/19/2025 THE SAUCE CREATIVE SERVICES CORP SUMMER/FALL REC GUIDE DESIGN & SPANISH TRANSLATION 100-60-640-51100-00000 990.00$ 252345 08/19/2025 THE SAUCE CREATIVE SERVICES CORP SUMMER/FALL REC GUIDE DESIGN & SPANISH TRANSLATION 100-60-650-51100-00000 2,800.00$ 252345 08/19/2025 THE SAUCE CREATIVE SERVICES CORP SUMMER/FALL REC GUIDE DESIGN & SPANISH TRANSLATION 100-60-660-51100-00000 550.00$ 252343 08/19/2025 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS PLHA FUNDS TO ESPERANZA VILLA TINY HOMES NOV 2024 225-60-690-53370-66027 2,181.62$ 252344 08/19/2025 STUART CAPITAL LLC REFUND C&D 14527 CLARK AVE B00-022-520,521,546 246-00-000-22540-00000 15,000.00$ 252345 08/19/2025 THE SAUCE CREATIVE SERVICES CORP SUMMER/FALL REC GUIDE DESIGN & SPANISH TRANSLATION 100-60-630-51100-00000 1,000.00$ 252343 08/19/2025 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS GEN FUNDS TO ESPERANZA TINY HOMES OCT 2024 100-60-690-53370-00000 10,925.03$ 252343 08/19/2025 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS PLHA FUNDS TO ESPERANZA TINY HOMES OCT 2024 225-60-690-53370-66027 1,072.79$ 252343 08/19/2025 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS GEN FUNDS TO ESPERANZA VILLA TINY HOMES NOV 2024 100-60-690-53370-00000 13,313.56$ 252343 08/19/2025 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS PLHA FUNDS TO ESPERANZA VILLA TINY HOMES AUG 2024 225-60-690-53370-66027 2,389.35$ 252343 08/19/2025 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS GEN FUNDS TO ESPERANZA VILLA TINY HOMES SEP 2024 100-60-690-53370-00000 8,406.35$ 252343 08/19/2025 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS PLHA FUNDS TO ESPERANZA VILLA TINY HOMES SEP 2024 225-60-690-53370-66027 2,187.87$ 252343 08/19/2025 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS GEN FUNDS TO ESPERANZA VILLA TINY HOMES JUL 2024 100-60-690-53370-00000 9,826.90$ 252343 08/19/2025 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS PLHA FUNDS TO ESPERANZA VILLA TINY HOMES JUL 2024 225-60-690-53370-66027 929.59$ 252343 08/19/2025 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS GEN FUNDS TO ESPERANZA VILLA TINY HOMES AUG 2024 100-60-690-53370-00000 8,942.96$ 252342 08/19/2025 ROGER LI CONSTRUCTION, INC. REFUND C&D 13500 PALM AVE BLDG-0125-4953 246-00-000-22540-00000 300.00$ 252343 08/19/2025 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS GEN FUNDS TO ESPERANZA VILLA TINY HOMES JUN 2024 100-60-690-53370-00000 10,093.53$ 252343 08/19/2025 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS PLHA FUNDS TO ESPERANZA VILLA TINY HOMES JUN 2024 225-60-690-53370-66027 1,634.39$ 252341 08/19/2025 RKA CONSULTING GROUP MAY 2025 CITY ENGINEERING SERVICES 240-50-510-51100-00000 6,650.00$ 252341 08/19/2025 RKA CONSULTING GROUP MAY 2025 CIVIL & BUILDING PLAN CHECK SERVICES 270-50-520-58100-55022 140.00$ 252341 08/19/2025 RKA CONSULTING GROUP JUN 2025 CITY ENGINEERING SERVICES 240-50-510-51100-00000 6,912.50$ 252340 08/19/2025 RIO HONDO COMM. COLLEGE MODULE II FOR PST'S CABRERA, EAVES, LARIOS, & SOTO 100-30-310-53200-00000 2,184.00$ 252340 08/19/2025 RIO HONDO COMM. COLLEGE MODULE I FOR PST'S CABRERA, EAVES, LARIOS, & SOTO 100-30-310-53200-00000 3,769.00$ 252341 08/19/2025 RKA CONSULTING GROUP APR 2025 CITY ENGINEERING SERVICES 240-50-510-51100-00000 7,875.00$ 252338 08/19/2025 REGIONAL TAP SERVICE CENTER JUNE 2025 POSITION SUMMARY 244-50-580-51100-15545 36.00$ 252339 08/19/2025 REYNOLDS MOTOR CORP. MAINTENANCE & REPAIRS TO UNIT #5040 6/3/25 402-50-590-53371-00000 1,132.57$ 252339 08/19/2025 REYNOLDS MOTOR CORP. MAINTENANCE & REPAIRS TO UNIT #5040 6/24/25 402-50-590-53371-00000 1,652.80$ 252336 08/19/2025 PERIC FANG REFUND C&D 4246 CULTER AVE BLDG-0323-1765 246-00-000-22540-00000 802.00$ 252337 08/19/2025 RAUL FLORES TRUSS & LIGHTING RENTAL FOR STREET MARKET IN PARK 501-60-000-22328-16101 3,500.00$ 252338 08/19/2025 REGIONAL TAP SERVICE CENTER APRIL 2025 POSITION SUMMARY 244-50-580-51100-15545 13.00$ 252334 08/19/2025 PALICON GROUP BACKGROUND FOR OFFICER APPLICANT D. ESCALONA 100-30-310-51100-00000 2,000.00$ 252335 08/19/2025 PEDROZA CONCRETE SYSTEMS, INC GRAVEL ROAD INSTALLATION @ 701 FRAZIER 6/29/25 245-50-551-51101-15705 3,780.00$ 252333 08/19/2025 OSCAR MIRANDA HYDRO JETTING SEWER CUTTING & REMOVING 6/24/25 255-50-551-51100-15705 1,500.00$ 252334 08/19/2025 PALICON GROUP BACKGROUND FOR OFFICER APPLICANT M. FINO 100-30-310-51100-00000 2,000.00$ 252330 08/19/2025 NEW CHEF FASHION, INC. 2 JACKETS WITH CITY LOGO 100-10-150-53370-11123 82.88$ 252331 08/19/2025 NORMAN A. TRAUB & ASSOCIATES ARBITRATION PREPARATION/MEETINGS 9/16/23-9/26/24 403-10-131-51102-00000 1,160.00$ 252332 08/19/2025 ODP BUSINESS SOLUTIONS, LLC CUSTOME STAMPS RECEIVED 100-40-450-53100-00000 90.05$ 252328 08/19/2025 MERRIMAC ENERGY GROUP REGULAR UNLEADED GASOLINE FOR ALL CITY VEHICLES 402-50-591-53110-16140 13,142.39$ 252329 08/19/2025 MYNOR RACANCOJ REFUND C&D 4629 MONTEREY AVE B00-022-276 246-00-000-22540-00000 754.00$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 52.37$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 52.37$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 57.31$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 24.84$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 24.84$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 21.32$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 21.33$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 57.32$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 46.04$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 39.15$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 39.14$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 5.51$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 5.51$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 46.03$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 30.66$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 13.10$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 13.10$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 40.80$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 40.80$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 30.65$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 30.66$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 13.21$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 13.21$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 17.52$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 17.51$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 30.65$ 252367 08/21/2025 HELEN HERNANDEZ REIM-MATERIALS & SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 249.54$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 27.00$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 26.99$ 252364 08/21/2025 EMBLEMS INC. BPPD BLACK & GRAY HASHMARKS 100-30-310-53100-00000 117.00$ 252365 08/21/2025 FRANCISCO J. CARVENTE MUSIC ENTERTAINMENT MEXICAN INDEPENDENCE 9/17/25 501-60-000-22327-00000 650.00$ 252366 08/21/2025 GUSTAVO VASQUEZ REIM-MATERIAL & SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 43.08$ 252363 08/21/2025 DJOAINE ASIS MUSICAL ENTERTAINMENT AT ZOCALO PARK 9/23/25 110-60-685-51101-00000 1,000.00$ 252364 08/21/2025 EMBLEMS INC. BPPD SHOULDER PATCHES 100-30-310-53100-00000 351.00$ 252364 08/21/2025 EMBLEMS INC. BPPD SGT, DET, CORPORAL, & FTO PATCHES 100-30-310-53100-00000 2,612.00$ 252360 08/21/2025 CINTAS FIRST AID & SAFETY FIRST AID & SAFETY FOR SECOND FLOOR 403-10-160-51101-00000 324.30$ 252361 08/21/2025 CONCENTRA HEALTH SERVICES, INC 1 CLASS I PHYSICAL& DOT PHYSICAL 100-10-150-51101-11122 180.00$ 252362 08/21/2025 DAVID EVANS AND ASSOCIATES INC. LNDSCP PLAN CK-LP-24-06 4437 PHELAN 6/29-8/2/25 100-40-000-22350-14133 208.00$ 252358 08/21/2025 CALIFORNIA POLICE CHIEFS ASSOCIATION CPCA DUES FOR 76-100 PERSONNEL 7/1/25-6/30/26 100-30-300-53330-00000 1,872.00$ 252359 08/21/2025 CHICAS GRAPHICS AND DESIGN BANNERS & SIGNS FOR PRIDE OF THE VALLLEY 5K RUN 100-60-610-53100-16146 1,430.98$ 252359 08/21/2025 CHICAS GRAPHICS AND DESIGN 4 BANNERS MADE FOR BASIC PROGRAM 100-60-650-53100-00000 265.20$ 252357 08/21/2025 BMI ANNUAL MUSIC LICENSE FEE 7/1/25-6/30-26 100-60-660-53330-00000 213.60$ 252357 08/21/2025 BMI ANNUAL MUSIC LICENSE FEE 7/1/25-6/30-26 100-60-670-53330-15100 213.60$ 252357 08/21/2025 BMI ANNUAL MUSIC LICENSE FEE 7/1/25-6/30-26 100-60-680-53330-00000 213.60$ 252356 08/21/2025 ALCO TARGET CO. SUPPLIES FOR RANGE 100-30-310-53100-00000 310.08$ 252357 08/21/2025 BMI ANNUAL MUSIC LICENSE FEE 7/1/25-6/30-26 100-60-610-53330-00000 213.60$ 252357 08/21/2025 BMI ANNUAL MUSIC LICENSE FEE 7/1/25-6/30-26 100-60-630-53330-00000 213.60$ 252353 08/19/2025 YUNEX LLC JUN 2025 TRAFFIC SIGNAL MAINTENANCE & CALL OUTS 255-50-551-51100-15705 1,900.00$ 252354 08/21/2025 ADLERHORST INTERNATIONAL LLC WORKING BALL T-TUG HANDLE & LEASH FOR K9 KYRA 100-30-310-53100-17110 113.14$ 252355 08/21/2025 ADMIN SURE INC. SEP 2025 GEN & AUTO LIABILITY - WORKERS COMP-ADMIN 403-10-160-51100-00000 9,223.00$ 252353 08/19/2025 YUNEX LLC JUN 2025 TRAFFIC SIGNAL MAINTENANCE & CALL OUTS 245-50-551-51101-15705 2,102.00$ 252353 08/19/2025 YUNEX LLC JUN 2025 TRAFFIC SIGNAL MAINTENANCE & CALL OUTS 251-50-551-51101-15510 123.00$ 252353 08/19/2025 YUNEX LLC JUN 2025 TRAFFIC SIGNAL MAINTENANCE & CALL OUTS 245-50-550-51100-15705 2,610.45$ 252353 08/19/2025 YUNEX LLC JUN 2025 TRAFFIC SIGNAL MAINTENANCE & CALL OUTS 245-50-550-51101-00000 1,076.91$ 252353 08/19/2025 YUNEX LLC JUN 2025 TRAFFIC SIGNAL MAINTENANCE & CALL OUTS 245-50-551-51100-15510 1,500.00$ 252352 08/19/2025 WILLDAN ENGINEERING PROFESSIONAL SERVICES RENDERED THROUGH 5/2/25 240-50-510-51100-00000 559.50$ 252352 08/19/2025 WILLDAN ENGINEERING PROFESSIONAL SERVICES RENDERED THROUGH 5/30/25 240-50-510-51100-00000 2,121.00$ 252352 08/19/2025 WILLDAN ENGINEERING PROFESSIONAL SERVICES RENDERED THROUGH 6/30/25 240-50-510-51100-00000 702.00$ 252351 08/19/2025 WEST COAST ARBORISTS, INC CITY WIDE TREE MAINTENANCE CONTRACT 6/3-6/9/2025 251-50-561-51100-00000 3,489.75$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14403 PACIFIC 8/1/25 252-60-620-53371-00000 32.71$ 252386 08/21/2025 TERRA REALTY ADVISORS INC BILLBOARD MATTERS 100-40-405-51100-00000 1,146.66$ 252387 08/21/2025 U.S. ARMOR CORPORATION SAFETY VEST FOR PD OFFICER 100-30-340-53100-00000 936.95$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14403 PACIFIC 8/1/25 100-60-620-53371-00000 70.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14403 PACIFIC 8/1/25 252-60-620-53371-00000 70.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14403 PACIFIC 8/1/25 100-60-620-53371-00000 32.71$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14305 MORGAN 7/25/25 252-60-620-53371-00000 41.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 4100 BALDWIN PARK 7/7/25 100-60-620-53371-00000 75.60$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 4100 BALDWIN PARK 7/7/25 252-60-620-53371-00000 75.60$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 1209 VINELAND 7/25/25 100-60-620-53371-00000 30.00$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 1209 VINELAND 7/25/25 252-60-620-53371-00000 30.00$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14305 MORGAN 7/25/25 100-60-620-53371-00000 41.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 15010 BADILLO 7/17/25 252-60-620-53371-00000 34.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 3251 PATRITTI 7/25/25 100-60-620-53371-00000 40.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 3251 PATRITTI 7/25/25 252-60-620-53371-00000 40.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 15010 BADILLO 7/17/25 100-60-620-53371-00000 48.00$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 15010 BADILLO 7/17/25 252-60-620-53371-00000 48.00$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 15010 BADILLO 7/17/25 100-60-620-53371-00000 34.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 13135 GARVEY 7/17/25 252-60-620-53371-00000 84.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 13135 GARVEY 7/17/25 100-60-620-53371-00000 29.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 13135 GARVEY 7/17/25 252-60-620-53371-00000 29.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 13135 GARVEY 7/17/25 100-60-620-53371-00000 62.38$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 13135 GARVEY 7/17/25 252-60-620-53371-00000 62.38$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 13135 GARVEY 7/17/25 100-60-620-53371-00000 84.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14349 PACIFIC 7/17/25 252-60-620-53371-00000 78.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14403 PACIFIC 7/17/25 100-60-620-53371-00000 50.00$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14403 PACIFIC 7/17/25 252-60-620-53371-00000 50.00$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14403 PACIFIC 7/11/25 100-60-620-53371-00000 32.71$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14403 PACIFIC 7/11/25 252-60-620-53371-00000 32.71$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14349 PACIFIC 7/17/25 100-60-620-53371-00000 78.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 4100 BALDWIN PARK 7/7/25 252-60-620-53371-00000 109.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14403 PACIFIC 7/11/25 100-60-620-53371-00000 70.50$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 14403 PACIFIC 7/11/25 252-60-620-53371-00000 70.50$ 252382 08/21/2025 SMART & FINAL MATERIALS&SUPPLIES FOR THE STREET MARKET 100-60-610-53100-16101 12.69$ 252383 08/21/2025 SPORT PINS INTERNATIONAL MEDALS FOR PRIDE OF THE VALLEY 5K RUN 501-60-000-22328-16146 3,501.88$ 252384 08/21/2025 TERMINIX EXTERMINATION SERVICES AT 4100 BALDWIN PARK 7/7/25 100-60-620-53371-00000 109.50$ 252381 08/21/2025 SIRCHIE FINGER PRINT LABORATORIES SUPPLIES FOR EVIDENCE - PD 100-30-360-53100-00000 168.92$ 252381 08/21/2025 SIRCHIE FINGER PRINT LABORATORIES SUPPLIES FOR EVIDENCE - PD 100-30-360-53100-00000 212.66$ 252382 08/21/2025 SMART & FINAL MATERIAL&SUPPLIES FOR COMMUNITY CENTER 100-60-610-53100-00000 7.71$ 252379 08/21/2025 RAQUEL M. CERVANTES CASE# RID 1202591- NOE CERVANTES 100-00-000-21225-00000 115.39$ 252380 08/21/2025 RODOLFO CARDENAS MUSIC ENTERTAINMENT FOR FASHION SHOW 8/20/25 501-60-000-22327-00000 250.00$ 252381 08/21/2025 SIRCHIE FINGER PRINT LABORATORIES SUPPLIES FOR EVIDENCE - PD 100-30-360-53100-00000 30.89$ 252378 08/21/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-360-53100-00000 1,115.69$ 252378 08/21/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-310-53100-00000 179.89$ 252378 08/21/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-310-53100-00000 13.56$ 252375 08/21/2025 LOS ANGELES COUNTY SHERIFFS DEPARTMENT LEVYING OFFICER FILE#3302501060096-W.GARNISHMENT 100-00-000-21225-00000 142.40$ 252376 08/21/2025 MAVERICK DATA SYSTEMS WARRANT BUILDER SUBS FOR DET BUREAU-ANNUAL LICENSE 100-30-360-53330-00000 2,500.00$ 252377 08/21/2025 MAXIMINO RUIZ RODRIGUEZ FINAL PAYMENT-CONCERT AT STREET MARKET 8-21-25 100-60-610-51100-16101 3,520.00$ 252374 08/21/2025 LILAS INC CLEANING SERVICES FOR JAIL 8/7/25 100-30-370-51101-00000 70.00$ 252374 08/21/2025 LILAS INC CLEANING SERVICES FOR JAIL 7/30/25 100-30-370-51101-00000 70.00$ 252373 08/21/2025 JOCELYN BADILLO REIM-MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 41.01$ 252374 08/21/2025 LILAS INC CLEANING SERVICES FOR JAIL 7/11/25 100-30-370-51101-00000 70.00$ 252370 08/21/2025 JENNY TORRES FOOD ITEM FOR VALLEY 5K RUN WINNERS 100-60-610-53100-16146 98.44$ 252371 08/21/2025 JESSICA SERRANO PER DIEM-ADVANCED SEARCH WARRANT:8/21-22/2025 100-30-310-53200-00000 16.00$ 252372 08/21/2025 JOAN GASCA FY25-26 TUITION REIM-ORGANIZATIONAL THEORY CLASS 100-10-150-53210-11121 856.27$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 252-60-620-53100-00000 23.14$ 252369 08/21/2025 INTERACTIVE DATA, LLC ONLINE SEARCH SITES FOR DB CASES 100-30-360-51100-00000 84.00$ 252370 08/21/2025 JENNY TORRES PRIDE OF VALLEY 5K RUN SANCTION FEE 100-60-610-51101-16146 455.56$ 252368 08/21/2025 HOME DEPOT MATERIAL&SUPPLIES FOR FACILITY MAINTENANCE 100-60-620-53100-00000 23.14$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number DFT0011588 08/22/2025 STATE DISBURSEMENT SDU - CHILD SUPPORT 100-00-000-21225-00000 3,903.28$ DFT0011589 08/22/2025 STATE DISBURSEMENT SDU - CHILD SUPPORT 100-00-000-21225-00000 261.69$ Grand Total: 1,146,907.73$
DFT0011469 08/14/2025 PERS-RETIREMENT PERS MISC CITY PAID - PEPRA 100-00-000-21256-00000 3.65$ DFT0011482 08/14/2025 PERS-RETIREMENT S. ANAYA - PERS SURVIVOR RETIREMENT 100-00-000-21207-00000 (0.93)$ DFT0011483 08/14/2025 PERS-RETIREMENT ROUNDING DIFFERENCE 100-25-299-53370-00000 (0.13)$ DFT0011442 08/14/2025 PERS-RETIREMENT PERS MISC CITY PAID - PEPRA 100-00-000-21256-00000 21,382.86$ DFT0011467 08/14/2025 PERS-RETIREMENT PERS SWORN ER REG PAY 100-00-000-21256-00000 (0.52)$ DFT0011468 08/14/2025 PERS-RETIREMENT PERS MISC CITY PAID 100-00-000-21256-00000 2.89$ DFT0011439 08/14/2025 PERS-RETIREMENT PERS SWORN ER REG PAY 100-00-000-21256-00000 27,304.07$ DFT0011440 08/14/2025 PERS-RETIREMENT PT PERS MISC CITY PAID 100-00-000-21256-00000 660.80$ DFT0011441 08/14/2025 PERS-RETIREMENT PERS MISC CITY PAID 100-00-000-21256-00000 24,777.12$ DFT0011417 08/14/2025 PERS-RETIREMENT PERS MISC 352 100-00-000-21206-00000 13,556.43$ DFT0011438 08/14/2025 PERS-RETIREMENT PERS SWORN CITY PAID - PEPRA 100-00-000-21256-00000 28,142.80$ DFT0011414 08/14/2025 PERS-RETIREMENT PERS SWORN- 344 100-00-000-21206-00000 27,660.01$ DFT0011415 08/14/2025 PERS-RETIREMENT PERS MISC 350 100-00-000-21206-00000 17,202.33$ DFT0011416 08/14/2025 PERS-RETIREMENT PERS SWORN 351 100-00-000-21206-00000 8,975.05$ 252389 08/21/2025 WILDFIRE ARTS ENTERTAINMENT LLC BUBBLE ENTERTAINMENT@YOUTH SPORTS CEREMONY 8/5/25 501-60-000-22326-00000 500.00$ DFT0011412 08/14/2025 PERS-RETIREMENT PERS SURVIVOR RETIREMENT 100-00-000-21207-00000 196.23$ DFT0011413 08/14/2025 PERS-RETIREMENT PERS REDEPOSIT 100-00-000-21206-00000 21.78$ 252387 08/21/2025 U.S. ARMOR CORPORATION SAFETY VEST FOR PD OFFICER 100-30-340-53100-00000 936.95$ 252388 08/21/2025 ULINE, INC. EVENT CHAIRS FOR ZOCALO PARK 110-60-685-53100-00000 4,250.86$ 252388 08/21/2025 ULINE, INC. SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 383.42$
ITEM NO: 2.
STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Manuel Carrillo Jr, Chief Executive Officer
PREPARED BY: Shirley Quinones, Chief Deputy City Clerk
DATE: September 3, 2025
SUBJECT: Meeting Minutes of August 20, 2025
SUMMARY:
The City Council held the following meetings on August 20, 2025; Special City Council Meeting, Regular City Council Meeting, Finance Authority Meeting and Housing Authority Meeting.
RECOMMENDED ACTION:
It is recommended that the City Council approve the following meeting minutes of the Special City Council Meeting, Regular City Council Meeting, Finance Authority Meeting and the Housing Authority Meeting held on August 20, 2025.
FISCAL IMPACT:
There is no fiscal impact associated with this item.
BACKGROUND:
None
DISCUSSION:
None
ALTERNATIVES:
None
CEQA REVIEW:
These actions are exempt from review under the California Environmental Quality Act (California Public Resources Code §§ 2100, et seq., “CEQA”) and CEQA regulations (14 California Code of Regulations §§ 15000, et seq.)
LEGAL REVIEW:
This report does not require legal review.
ATTACHMENTS:
1. Meeting Minutes of August 20 2025
8-20-2025 City Council Regular_FA_HA Minutes
CITY COUNCIL
FINANCE AUTHORITY
HOUSING AUTHORITY
REGULAR MEETING
Minutes
August 20, 2025, 7:00 PM
Mayor
Mayor Pro Tem
Councilmember
Councilmember
Councilmember
Alejandra Avila
Daniel Damian
Jean M. Ayala
Emmanuel J. Estrada
Manuel Lozano
These minutes are presented in Agenda order.
CALL TO ORDER
The meeting was called to order at approximately 7:04 p.m. by Mayor Avila.
INVOCATION
The invocation was given by Pastor Jackson.
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Chief Executive Officer Carrillo.
ROLL CALL
City Clerk Saenz performed roll call:
MEMBERS:
Council Member Jean M. Ayala (present)
Council Member Emmanuel J. Estrada (present)
Council Member Manuel Lozano (present)
Mayor Pro Tem Daniel Damian (present)
Mayor Alejandra Avila (present)
REPORT FROM CLOSED SESSION
The Clerk records no special meeting occurred on 8/20/2025.
ANNOUNCEMENTS
Mayor announced that the City Council are also members of the Board of Directors of the Housing Authority and Finance Authority which are concurrently convening with the City Council this evening and each Council Member is paid an additional stipend of $30 for attending the Housin g Authority meeting and $50 for attending the Finance Authority meeting.
PROCLAMATIONS, COMMENDATIONS & PRESENTATIONS
Mayor and the City Council proclaimed August 20, 2025 as Vaia Rue Beatrix Cazares Day.
Jose Martinez, General Manager of VCWD gave Water District Updates.
PUBLIC COMMUNICATIONS
Mayor Avila opened Public Communications at approximately 7:47 p.m., the following spoke:
1) Irma Morales
Seeing no one else wishing to speak public communications was closed.
8-20-2025 City Council Regular_FA_HA Minutes
CONSENT CALENDAR
1. City of Baldwin Park’s Warrants and Demands
Motion to ratify the attached Warrants and Demands Register.
MOTION: It was moved by Manuel Lozano, seconded by Daniel Damian to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
2. Treasurer's Report CC - June 2025
Motion to receive and file the Treasurer’s Report for June 2025.
MOTION: It was moved by Manuel Lozano, seconded by Daniel Damian to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
3. Meeting Minutes of August 6, 2025
Motion to approve the following meeting minutes of the Special City Council and the Regular City Council Meeting held on August 6, 2025.
MOTION: It was moved by Manuel Lozano, seconded by Daniel Damian to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
4. Approve the Selection of Vendors for the Purchase of Three (3) Trucks from Puente Hills Ford with Aftermarket Equipment (AME) from Black & White Emergency Vehicles
Motion to:
1. Authorize the purchase of:
- One (1) Ford F-250 in the amount of $66,730.35, and
- Two (2) Ford Ranger XLTs at $49,823.00 each (totaling $99,646) from Puente Hills Ford
2. Approve the purchase of Aftermarket Equipment (AME) from Black & White Emergency Vehicles in the amount of $75,000 for all three (3) vehicles.
3. Authorize the Director of Finance to appropriate the amounts listed below from Measure BP Fund, make the necessary budget adjustments, and create new account numbers as needed to track all related expenditures.
- $166,377 for vehicle purchases plus 10% contingency
- $75,000 for AME plus 10% contingency
- $24,200 for contingency. Each purchase requisition will include a 10% contingency for the purchase of trucks and AME upfitting.
4. Authorize the Director of Public Works, or their designee, to execute all documents necessary to complete the purchases.
Item #4 was pulled for further discussion.
MOTION: It was moved by Daniel Damian, seconded by Manuel Lozano to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
8-20-2025 City Council Regular_FA_HA Minutes
5. Approval of Amendment No. 3 to the Grant Agreement with Oath to Country Foundation (OTCF) to support the continued operation of the senior Veteran home as part of the Home Rehabilitation Pilot
Motion to:
1. Authorize the Chief Executive Officer (CEO) to execute an amended Grant Agreement with Oath to Country Foundation (OTCF) subject to any non-substantive changes made by the CEO and City Attorney; and
2. Authorize the Director of Finance to re-appropriate funding for the Home Rehabilitation Pilot Program and make the necessary budget adjustments; and
3. Approve the Addendum to the Inter-Agency Agreement between the City of Baldwin Park and the Police Department for the ARPA Obligation; and
4. Approve the Addendum to the Inter-Agency Agreement between the City of Baldwin Park and the Community Development Department for the ARPA Obligation.
5. Set priority to veterans listed on the Code Enforcement List.
Item #5 was pulled for further discussion.
MOTION: It was moved by Daniel Damian, seconded by Alejandra Avila to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
6. Consider Approval of Amendment No. 2 to the Maintenance Services Agreement (MSA) With West Coast Arborists (WCA), Inc. for the Citywide Tree Maintenance Services Agreement
Motion to:
1. Approve Amendment No. 2 to the Maintenance Services Contract with West Coast Arborists (WCA), Inc. for Citywide Tree Maintenance Services, extending the term contract for an additional one (1) year and adjusting rates by 3.0% for FY25-26 due to CPI increase; and,
2. Approve an increase to the annual not-to-exceed contract amount from $171,000 to $225,000 in FY25-26 to reflect the CPI increase and to perform additional grid trims; and
3. Authorize the Mayor and City Clerk to execute Amendment No. 2; and,
4. Authorize the Director of Finance to make necessary appropriation and budget adjustments for the increase in rates to allow payments approved for FY 2025-26.
Item #6 was pulled for further discussion.
MOTION: It was moved by Emmanuel J Estrada, seconded by Alejandra Avila to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
PUBLIC HEARING
7. Conduct a Public Hearing and Adopt Resolution No. 2025-031 and Resolution No. HA 2025-005 Approving the Adoption of an Updated Fee Schedule for Issuing, Processing and Filing of Various City Services and Permits
Motion to adopt Resolution No. 2025-031 and HA 2025-005 approving the Proposed City of Baldwin Park and Baldwin Park Housing Authority Fee Schedule.
The City Council and the Housing Authority Public Hearings were conducted simultaneously.
8-20-2025 City Council Regular_FA_HA Minutes
Mayor Avila opened the Public Hearing at approximately 8:06 p.m., seeing no one wishing to speak, the public hearing was closed.
MOTION: It was moved by Manuel Lozano, seconded by Daniel Damian to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
REPORTS OF OFFICERS
8. Project Status Update on the CDBG Citywide Sidewalk Replacement Project Motion to receive and file the report regarding this Project status update.
MOTION: It was moved by Daniel Damian, seconded by Manuel Lozano to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
CITY COUNCIL ACTING AS SUCCESSOR AGENCY OF THE DISSOLVED COMMUNITY
DEVELOPMENT COMMISSION
9. Treasurer's Report SA - June 2025
Motion to receive and file the Treasurer’s Report for June 2025.
MOTION: It was moved by Manuel Lozano, seconded by Daniel Damian to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
FINANCE AUTHORITY
10. Treasurer's Report FA - June 2025
Motion to receive and file the Treasurer’s Report for June 2025.
MOTION: It was moved by Jean M Ayala, seconded by Manuel Lozano to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
HOUSING AUTHORITY
11. Baldwin Park Housing Authority’s Warrants and Demands Motion to ratify the attached Warrants and Demands Register.
MOTION: It was moved by Jean M Ayala seconded by Manuel Lozano to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
12. Treasurer's Report HA - June 2025
Motion to receive and file the Treasurer’s Report for June 2025.
MOTION: It was moved by Jean M Ayala seconded by Manuel Lozano to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
HOUSING AUTHORITY PUBLIC HEARING
13. Conduct a Public Hearing and Adopt Resolution No. 2025-031 and Resolution No. HA 2025-005 Approving the Adoption of an Updated Fee Schedule for Issuing, Processing and Filing of Various City Services and Permits
Motion to adopt Resolution No. 2025-031 and HA 2025-005 approving the Proposed City of Baldwin Park and Baldwin Park Housing Authority Fee Schedule.
8-20-2025 City Council Regular_FA_HA Minutes
The City Council and the Housing Authority Public Hearings were conducted simultaneously.
Mayor Avila opened the Public Hearing at approximately 8:06 p.m., seeing no one wishing to speak, the public hearing was closed.
MOTION: It was moved by Manuel Lozano, seconded by Daniel Damian to adopt motion. Passed. [5-0] AYES: AYALA, ESTRADA, LOZANO, DAMIAN, AVILA
CITY COUNCIL / CITY CLERK / CITY TREASURER / STAFF REQUESTS &
COMMUNICATION
Council Member Lozano sought consensus of the City Council to direct staff to look into the possibility of placing a traffic light by Puente and Walnut creek. Also, wanted to inform the Council of Neighborhood Meeting with the residents near the Bassett Project.
Mayor Alejandra Avila sought consensus of the City Council to direct staff to light up the Bridge in Teal beginning on November 3 for Alzheimer’s Awareness Month.
Council Member Estrada sought consensus of the City Council to direct staff to send letter to all agencies and CPUC regarding the raising water rates.
ADJOURNMENT
The meeting was adjourned at approximately 8:33 p.m. by Mayor Avila.
APPROVED: September 20, 2025
Alejandra Avila, Mayor
ATTEST:
Christopher Saenz, City Clerk
ITEM NO: 3.
STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Manuel Carrillo Jr, Chief Executive Officer
PREPARED BY: Karina Rueda, Human Resources/Risk Manager DATE: September 3, 2025
SUBJECT: Claim Rejection
SUMMARY:
This report seeks City Council consideration and direction to reject the Claim for Damages to person or property received for filing against the City of Baldwin Park.
RECOMMENDED ACTION:
It is recommended that the City Council reject the following claim and direct staff to send the appropriate notice of rejection to the claimant:
• Henry Saenz The claimant alleges bodily injury. • Gerardo Chavarria Gonzalez The claimant alleges property damages.
This government claim, and all government claims, should be considered as potential lawsuits in the future. Thus, it is requested that all City Staff, the Mayor and all Council Members refrain from making any statements, whether public or private in nature. It is important that no statements be made so as to not prejudice this claim in any way which can happen if public or private comments are made about this claim by City staff or Council Members.
FISCAL IMPACT:
Fiscal impact is unknown at this time.
BACKGROUND:
In order for the statute of limitations to begin on the claim received, it is necessary for the City Council to reject the claim by order of motion and that the claimant is sent written notification of said action.
DISCUSSION:
None.
ALTERNATIVES:
There are no other alternatives for the Council to consider since rejection of the claim is necessary for the Statute of Limitations to begin on the claim received.
CEQA REVIEW:
None.
LEGAL REVIEW:
This report does not require legal review.
ATTACHMENTS:
None
ITEM NO: 4.
STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Daniel Padilla, Director of Public Works
PREPARED BY: Lena Abdullah, Management Analyst
DATE: September 3, 2025
SUBJECT: Approval of Appropriation of Prop A Funds to cover an unscheduled engine overhaul of one of the City's Fixed
Route Buses, 2015 El Dorado E-Z Rider II Max Low Floor.
SUMMARY:
This item seeks City Council consideration for the approval of an appropriation $15,620.91 of Prop A funds to cover an emergency repair.
RECOMMENDED ACTION:
It is recommended that the City Council:
1. Approve the appropriation of $15,620.91 from Prop A Funds;
2. Authorize the Director of Finance to appropriate $15,620.91 from Fund #244 –Prop A and make necessary budget adjustments to cover the repairs; and
3. Authorize the Director of Public Works after the fact, or his designee, to complete all the proper documentation to process purchase requisition for purchase order for Nationwide Transit in the amount of $15,620.91 for the repair work to be completed.
FISCAL IMPACT:
There is no impact on the General Funds. The appropriation will come from Fund #244, Proposition A Local Return Funds in the amount of $15,620.91. The request has been submitted and approved by Metro.
BACKGROUND:
Southland Transit, Inc. (STI) has been the City’s transit service operator for over 30 years. On March 6, 2024, the City Council approved a Transit Services Agreement (TSA) with Southland Transit to continue to operate the City’s fixed route and dial-a-ride services as well as provide bus maintenance. Exhibit A- Scope of Services, Section G: Equipment-Vehicles of said agreements stipulates that some major repairs, including engine rebuilds, that STI's maintenance personnel are unable to complete will be completed by a third party and the City will cover the cost.
This City owns five (5) 2015 El Dorado EZ Rider II transit buses used to operate the Pumpkin and Teal Fixed Route Lines. At any given time, the maximum number of buses in operation at the same time is four (4). The fifth vehicle is used as a backup to ensure that, in the case of an unexpected breakdown or during scheduled maintenance, service is not interrupted and riders are not impacted.
DISCUSSION:
City Staff were informed that vehicle #3115 had broken down and an emergency overhaul of the engine was needed that STI's maintenance personnel were unable to complete. Therefore, STI and City Staff obtained a total of three quotes to determine where the repairs would be completed. The quotes are attached and summarized
below:
TEC of California, La Mirada, CA $ 26,352.13
Rush Truck Center, Whittier, CA $ 25,422.93
Nationwide Transit, Carson, CA $ 14,200.83
To avoid service disruptions, staff proceeded with the urgent repairs with Nationwide Transit. At the time of the preparation of this Staff Report the repairs were complete and the vehicle returned to service.
ALTERNATIVES:
None
CEQA REVIEW:
None.
LEGAL REVIEW:
This report does not require legal review.
ATTACHMENTS:
1. Nationwide Quote
2. Rush Truck Quote
3. TEC of CA Quote
4. Requisition Request Form
Anthony Vazquez
City of Baldwin Park
Mobile: (626) 960-3993
[email protected]
2015 El Dorado E-Z Rider II Max Low Floor
VIN: 1N9MNALG4FCO84199
Mileage: 291,793 mi
Customer Comments
Upon inspection well look for the cause of the failure to ensure it doesn't reoccur, this may add some parts but we DON'T add any extra labor.
This quote is for an engine that does not have any holes through the block Cummins ISLG Inframe
Description Price QTY HRS Subtotal
Labor: R&R ISLG Engine
Disassemble Engine, Replace Piston / Liners, Rod Bearings, Thermostat, Upper Gasket Set, Oil & Filter, Update to current calibration. test and inspect for leaks.
33.33 $5,833.33
Part: Complete Cummins 8.9 ISLG Inframe kit
New Steel Pistons
New liners
Cooling Nozzles
Connecting Rod Bearings
Upper & Lower gasket Sets
Rebuilt Cylinder Head
Oil Filter and oil
Spark Plugs
Thermostat
Oil cooler
Misc. shop supplies and HAZMAT Disposal
$7,000.00 1 $7,000.00
Subcontract: Warranty
1-year unlimited miles: The warranty covers repairs or service for one year, regardless of how many miles the bus is driven.
Work performed: The warranty covers only repairs or maintenance work that has been completed by NTS
Sensors and accessories: These are not included unless they are specifically replaced by the company (NTS) during repairs.
Driver neglect: If the engine fails due to driver neglect or poor maintenance (not following the proper maintenance schedule), the warranty could be voided.
Cummins maintenance recommendation: The bus must be maintained according to Cummins' specific maintenance schedule to avoid voiding the warranty.
$0.00
Estimated Tax (10.25%): $717.50 Total: $13,550.83 Nationwide Transit
1543 East Del Amo Boulevard
Carson, ca 90746
(310) 438-3627
[email protected]
nationwidetransit.com
Estimate #7581
Created: 07/30/2025
Payment Term: On Receipt
Service Writer: David Benalt
Powered by
Wed 7/30/2025 — Page 1 of 2
TOWING
Description Subtotal
Fee: CBP-NTS $650.00
Total: $650.00
Estimates provided are an approximation of timing and charges to you for the services requested. They are based on the anticipated work to be done. It is possible for unexpected complications to cause some deviation from the original quote. You hereby authorize the repair work described in this estimate to be done along with the procurement of the necessary material(s), including permission to operate the vehicle for on-road testing or inspection. If any additional repairs are required, we will prepare a revised work order providing the cost of additional parts and labor and total revised cost. All parts are new unless specified otherwise.
Deposits are non-refundable. No returns or refunds on special ordered items or electrical parts. There is no warranty for used parts or customer supplied parts.
You agree that we are not responsible for loss or damage to your vehicle, including loss of articles left in the vehicle, including, without limitation, in case of fire, theft, or any other cause(s) beyond our control.
Labor ................................................. $5,833.33 Parts ................................................. $7,000.00 Subcontracts ............................................ $0.00 Subtotal .................................... $12,833.33 Shop Supplies .................................... $0.00 EPA ..................................................... $0.00 Fees ................................................ $650.00 Tax .................................................. $717.50 Grand Total ................................... $14,200.83 Paid to Date ........................................ ($0.00) REMAINING BALANCE $14,200.83
We are not responsible for any delays caused by unavailability of parts or delays in delivery of parts by the supplier or transporter. You have the right to know before authorizing any additional repairs what those repairs will be and what they will cost. If required repairs exceed the authorized estimated amount, we must obtain your approval to perform the repairs. We will keep you informed and perform only repairs authorized by you.
Signature
Nationwide Transit
1543 East Del Amo Boulevard
Carson, ca 90746
(310) 438-3627
[email protected]
nationwidetransit.com
Estimate #7581
Created: 07/30/2025
Payment Term: On Receipt
Service Writer: David Benalt
Powered by
Wed 7/30/2025 — Page 2 of 2
Parts Quote #
Parts Quote by
Quote Expires
Customer #
State Zip RO#
Year
Parts Sub Total
$9,818.31 $21,242.31
$125.00 $125.00
$500.00 $500.00
$1,700.00 $1,700.00
$12,143.31
$11,424.00
$571.20
$55.00
$4.00
$24,197.51
$1,245.42
$25,442.93
Customer Signature X
Total
PLEASE SIGN AND SEND BACK TO FAX# 562-551-5094 Sales Tax (check one)
Parts TotalThe above estimate is based on our initial inspection, and does not cover additional parts and/or labor which may be required after the work is begun.
Occasionally, after a job has been started, worn or broken parts are discovered that are not evident upon first inspection. Quotations on parts and labor are current, and subject to change.
Machine Fee
EPA Fee
Shop Supplies
Service Department Phone Number
Service Department E-mail
562-551-5067
Rush Truck Center
2450 KELLA AVE
WHITTIER,CA 90601
Overhaul
Description
Cylinder Deck Adjust, If Needed
Fluids & Misc Parts
REPAIR ESTIMATE
Customer Name
Southland Transit
Unit Number
Make
Mileage
Fleet Cal to Update the Software After Engine Installation 07/10/25
Model VIN
Engine Make
$11,424.00
Comments
ESTIMATE PREPARED BY: Matthew Kamel Sublet
Labor Total
[email protected]
Labor
Phone Number
Freight
Sub Total
Contact
Address
Date
Engine Serial Number
City Fax Number
ACCEPT
DECLINE
1N9MNALG4FC084199EZ Rider II
El Dorado2015
291793 3115 CUMMINS
TEC of California Inc - La Mirada (Volvo/Mack) Primary Portal for Mack & Volvo Truck Repairs
15000 Firestone Blvd. La Mirada, California 90638
Phone: (714) 521-9806 - Fax: (714) 443-5241
Case Number: 19907423
Repair Order Number: N/A
Purchase Order Number: N/A
Service Advisor: Groom, Kevin - Case Date 2025-08-06 08:03:21 -0700 Customer: City Of Baldwin Park Unit Number:
Address: 13135 GARVEY AVE BALDWIN
PARK, CA 91706
Phone: (626) 705-6890
Fax: N/A
Customer Number: 563277
Asset: 2015 Unknown VNM
Serial Number: FC084199
VIN: 1N9MNALG4FC084199
Engine: CUM ISL
Engine Hours: 0
Odometer: 291793 Miles
Warranty Start: N/A
In Service: N/A
1 C/R QUOTE FOR ENGINE OVERHAUL
Quantity Price Totals
Labor: 40 $8,840.00
Parts: CU5569421RX HEAD,CYLINDER 1.0 $6,988.15 $6,988.15 CU3924447 SHIM 6.0 $54.04 $324.24
CU5633625 KIT,OVERHAUL 1.0 $4,739.89 $4,739.89
CU3886396 6.2 CALIBRATION FLT REG. 1.0 $140.70 $140.70
CRC05050 BRAKE CLEAN,LOW VOC CA COMPLIANT 6.0 $4.22 $25.32 24016949 SEALANT 2.0 $26.45 $52.90
CU3958112 COVER,GEAR 1.0 $195.73 $195.73
CU6305290 THERMOSTAT 1.0 $127.58 $127.58
RC-AFRRA053 GREEN 50/50 COOLANT 10.0 $10.29 $102.90
CU891017 10W-30 1 GAL 8.0 $20.01 $160.08
CU3945917 KIT,MAIN BEARING 1.0 $353.60 $353.60
CU5449240 PUMP ,LUBRICATING OIL 1.0 $461.94 $461.94
CU3950661 BEARING,CONNECTING ROD 12.0 $30.28 $363.36
CU6424502 KIT,SEAL 1.0 $111.19 $111.19
980464 CABLE TIE 20.0 $1.01 $20.20
948211 CABLE TIE 10.0 $0.96 $9.60
CU3163075 PAINT 1.0 $31.70 $31.70
CU5633319 KIT,UPPER ENGINE GASKET 1.0 $1,625.09 $1,625.09 Parts Total $15,834.17
Operation Total: $24,674.17
TEC of California Inc - La Mirada (Volvo/Mack) Primary Portal for Mack & Volvo Truck Repairs Updated at: 2025-08-06 12:25:55 -0700
Updated at: 2025-08-06 12:25:55 -0700
ESTIMATE
Parts
Labor
Shop Supplies
Taxes
Total
$15,834.17
$8,840.00
$100.00
$1,577.96
$26,352.13
All estimates are subject to teardown and inspection and are valid for 30 days from the date above. The undersigned Customer authorizes TEC Equipment, Inc., and/or its subsidiaries (collectively, “Dealer”), to perform service work on the identified vehicle and further agrees as follows: Dealer shall not be responsible for loss or damage to the vehicle, any articles left therein, or vehicle cargo (except when the result of Dealer’s gross negligence or willful misconduct). Dealer shall have no responsibility for any service delays resulting from the unavailability of parts, or delivery or transport delays, or lost profits or downtime while the vehicle is in Dealer’s possession. Customer authorizes dealer to operate the vehicle for testing, inspection, relocation, pickup, and/or delivery purposes. Dealer warrants only that each service performed shall be free from material defects in workmanship for a period of 90 days immediately following completion of such service; other than the foregoing warranty, DEALER MAKES NO
OTHER WARRANTY , EXPRESS OR IMPLIED, REGARDING ANY SERVICE WORK OR PARTS SUPPLIED IN CONNECTION
WITH SUCH WORK, INCLUDIING BUT NOT LIMITED TO ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Dealer’s liability arising out of any defective service work hereunder shall be limited to the cost of correcting such defect as reasonably determined by Dealer and shall not include any charges for transportation, towing, travel, substitute vehicles, consumable items, loss of revenue or profits, or downtime. IN NO CASE SHALL DEALER BE LIABLE TO
CUSTOMER FOR LOST PROFITS OR ANY SPECIAL, CONSEQUENTIAL, OR INCIDENTAL DAMAGES, HOWEVER CASUED, KNOWN OR UNKNOWN, ANTICIPATED OR UNANTICIPATED. Customer shall reimburse Dealer for all out-of-pocket expenses incurred by Dealer with respect to the vehicle, including but not limited to travel and transportation expenses, tow charges, and any work completed by third parties. Dealer will not return replaced parts to Customer except upon Customer’s written request prior to commencement of service.
AUTHORIZED BY:_________________________ DATE:___/____/____ TEC of California Inc - La Mirada (Volvo/Mack) Primary Portal for Mack & Volvo Truck Repairs Updated at: 2025-08-06 12:25:55 -0700
Updated at: 2025-08-06 12:25:55 -0700
ESTIMATE
TEC of California Inc - La Mirada (Volvo/Mack) Primary Portal for Mack & Volvo Truck Repairs
Customer: City Of Baldwin Park
Case Number: 19907423
Unit Number:
Asset: 2015 Unknown VNM
VIN: 1N9MNALG4FC084199
Fax #:
One-time Purchase _ FY25-26
If yes, please attach proof that the vendor is in good standing and free of suspension and debarment on SAM.gov.
Telephone
x Email
Internet
Other (Please provide explanation):
Name of employee who obtained / received quotes:
($10,000.01 - $50,000.00 Requires CEO Approval)
CEO Approval
(Over $50,000.00 Requires City Council Approval)
Department Head Name (Printed)
CEO Name (Printed)
Division Head Approval Division Head Name (Printed)
Department Head Approval
Tax:
Daniel Padilla
0.00 Are you using federal funds for this purchase? Yes No
0.00 Bus is a 2015 El Dorado E-Z Rider II Max Low Floor Subtotal:during repair.
Manuel Carrillo Jr.
x
vendor, Nationwide Transit, submited the lowest qualifying quote and is able to perform work within our timeline. Their work will also include a 1-year unlimited miles warranty on work or
0.00 Purchase requsition for emergency repair work to engine for one (1) city transit bus. Selected 244-50-580-58110-00000 15,620.91 Total: $15,620.91
Emergency Engine Repair Work to City Bus Shipping:
0.00 0.00
0.00 repairs performed by NTS.
CITY OF BALDWIN PARK
PURCHASE REQUISITION
Date:
Requisition #:
P.O. #:Nationwide TransitVendor:8.12.2025
Date Required: Order Date:
Vendor #:
Phone #:
1543 East Del Amo Blvd.
Carson, CA 90746
(310) 439-3627
Address:
Total AmountUnit PriceItem Qty Unit Account No. Catalog/Item No./Description * Requisition will also include an additional 10% contingency for any unforseen work needed Quotes:
Anthony Vazquez/ Joe Licitra
(310) 438-3627
(714) 443-5241
(562) 551-5067
Anthony Vazquez
$24,674.17
Please provide justification for purchase below:
City bus is currently in need of engine overhaul. City staff reached out to three (3) qualifying vendors for quotes. Nationwide Transit (NTS) submitted to lowest quote. Their cost will also include transportation to and from city yard facilities. Estimated time of completion is 4-5 business days. This emergency repair was expedited in order to avoid any disruptions to service.
Nationwide Transit
TEC of California
Method:
David Benalt
Kevin Groom
Matthew Kamel
Revised 5-28-2024
Purchases of $5,000 or more require three quotes. Please provide the information requested below. Justification required for Sole Source.
Vendors: Contact Person or Email:Phone # or Web Address:
Rush Truck Center
$14,200.83
25,42.93
ITEM NO: 5.
STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Daniel Padilla, Director of Public Works
PREPARED BY: Lena Abdullah, Management Analyst
DATE: September 3, 2025
SUBJECT: Approval of Memorandum of Understanding with the Los Angeles County Metropolitan Transportation Authority
(LACMTA) to Receive Proposition A Incentive Funds for
Reporting Data to National Transit Database (NTD) for City Transit Services for Report Year 2022-2023
SUMMARY:
This report seeks Council consideration for the approval of a Memorandum of Understanding (MOU) with the Los Angeles County Metropolitan Transportation Authority (LACMTA) in order for the City of Baldwin Park to receive Proposition “A” Discretionary Incentive funds in the amount of $144,404 for reporting year 2022-23 for reporting of Baldwin Park’s Transit Services data to the National Transit Database (NTD).
RECOMMENDED ACTION:
It is recommended that the City Council :
1. Approve the attached Memorandum of Understanding (MOU) with the Los Angeles County Metropolitan Transportation Authority (LACMTA) and authorize the Mayor to execute said agreement; and
2. Authorize the Director of Finance to accept the Proposition A Incentive Funds and make necessary budget adjustments related to this MOU.
FISCAL IMPACT:
There is no impact to the General Fund. The City will receive a total amount of $144,404 from LACMTA as Proposition “A” discretionary incentive program revenue. These restricted funds are used to offset the costs of operating the City’s Transit Services Program.
BACKGROUND:
The City of Baldwin Park voluntarily reports annual City transit program ridership and service miles statistics to LACMTA. The data includes annual costs, revenue, number of passengers, and services provided through the Baldwin Park Transit Program. LACMTA’s collected data from each operator generates additional Federal Section 5307 capital funds to the County of Los Angeles regionally.
On June 27, 2024, LACMTA approved the Fiscal Year 2024-25 transit fund allocations, which included funds to make payments to all cities that voluntarily reported NTD data for FY 2022-23. The City has voluntarily submitted NTD data to LACMTA, for Fiscal Year 2022-23 which successfully met all NTD and Federal Transit Administration (FTA) requirements including an NTD audit with no findings.
DISCUSSION:
The City of Baldwin Park receives funds for its NTD reporting based on the same formula that the FTA uses to reimburse LACMTA. The Federal process for reviewing the data creates a two-year lag between data submittal and fund disbursements. This year the City received an MOU for reporting year 2022-23. The NTD Funds will be
applied as revenue in FY2025-26.
ALTERNATIVES:
City Council may choose not to approve this MOU which is not recommend as the City will forfeit $144,404 in Proposition “A” discretionary revenue.
CEQA REVIEW:
The action being considered by the city council is exempt from the California Environmental Quality Act (CEQA) because it is not a “project” under section 15378(b)(5) of CEQA guidelines. The action involves an organizational or administrative activity of government that will not result in a direct or indirect physical change in the environment.
LEGAL REVIEW:
This report has been reviewed and approved by the City Attorney as to legal form and content.
ATTACHMENTS:
1. Baldwin Park FY25 MOUPAIBALP25000 Prop A Incentive Voluntary
MOUPAIBALP25000
PROPOSITION A DISCRETIONARY INCENTIVE GRANT PROGRAM
MEMORANDUM OF UNDERSTANDING
FOR COLLECTING AND REPORTING DATA FOR THE
NATIONAL TRANSIT DATABASE
FOR REPORT YEAR 2023
This Memorandum of Understanding (MOU) is entered into as of June 1, 2025 by and between Los Angeles County Metropolitan Transportation Authority (“LACMTA”) and the City of Baldwin Park (the “City”).
WHEREAS, on November 14, 1980, the voters of the County of Los Angeles approved by majority vote Proposition A, an ordinance establishing a one-half percent sales tax for public transit purposes; and
WHEREAS, at its September 26, 2001 meeting, the LACMTA authorized payment of Proposition A Discretionary Incentive funds to each participating agency in an amount equal to the Federal funds generated for the region by each agency’s reported data; and
WHEREAS, at its June 27, 2024 meeting, LACMTA approved the Fiscal Year FY 2024-25 transit fund allocations, which included funds to make payments to all cities that voluntarily reported NTD data for FY 2022-23; and
WHEREAS, the City has voluntarily submitted their FY2022-23 data to the National Transit Database (NTD) and have successfully met all NTD and Federal Transit Administration (FTA) requirements in order to generate Federal 5307 funds for the Los Angeles County region; and
WHEREAS, the City has requested funds under the Proposition A Discretionary Incentive Program for collecting and reporting data for the NTD from the FY 2022-23 Report Year (the “Project”); and
WHEREAS, on May 5, 2025, the Federal Transit Administration (FTA) published in the Federal Register the FY 2024-25 Apportionments, Allocations, and Program Information including unit values for the data reported to the NTD; and
WHEREAS, the parties desire to agree on the terms and conditions for payment for the Project.
NOW, THEREFORE, LACMTA and the City hereby agree to the following terms and procedures:
ARTICLE 1. TERM
1.0 This Memorandum of Understanding (“MOU”) will be in effect from June 1, 2025, through June 30, 2028 at which time all unused funds shall lapse.
ARTICLE 2. STANDARDS
2.0 To receive payment for the submittal of the FY 2022-23 NTD statistics, the City warrants that it:
A. Adhered to the Federal Guidelines for collecting and Reporting NTD statistics including all audit requirements;
B. Prepared and submitted the FY 2022-23 ANNUAL NTD REPORT of the City’s fixed-route and/or demand response transit service to the NTD on or before October 31, 2023;
C. Prepared and submitted the FY 2022-23 ANNUAL NTD REPORT of the City’s fixed-route and/or demand response transit service to the LACMTA on or before February 15, 2024;
ARTICLE 3. PAYMENT OF FUNDS TO CITY
3.0 LACMTA shall pay the City for collecting and reporting FY 2022-23 NTD statistics.
LACMTA shall pay the City for submitting the FY 2022-23 ANNUAL NTD REPORT for the applicable transit services as follows:
MOTOR BUS SERVICE
For City’s motor bus service, LACMTA shall pay an amount equal to the 183,638 revenue vehicle miles reported by the City multiplied by the FTA unit value of
0.686483228324693 per revenue vehicle mile. See Attachment A for detail.
DIAL-A-RIDE SERVICE
For City’s dial-a-ride service, LACMTA shall pay an amount equal to the 26,715 revenue vehicle miles reported by the City multiplied by the FTA unit value of
0.686483228324693 per revenue vehicle mile. See Attachment A for detail.
3.1 The City shall submit one invoice to LACMTA prior to June 30, 2028, in the amount of $144,404 to receive its payment described above.
3.2 INVOICE BY CITY:
Send invoice with supporting documentation to:
Los Angeles County Metropolitan Transportation Authority Accounts Payable
P. O. Box 512296
Los Angeles, CA 90051-0296
[email protected]
Re: LACMTA MOU# MOUPAIBALP25000 M.S. Chelsea Meister (99-21-3)
ARTICLE 4. CONDITIONS
4.0 The City agrees to comply with all requirements specified by the FTA guidelines for reporting NTD statistics.
4.1 The City understands and agrees that LACMTA shall have no liability in connection with the City’s use of the funds. The City shall indemnify, defend, and hold harmless LACMTA and its officers, agents, and employees from and against any and all liability and expenses including defense costs and legal fees and claims for damages of any nature whatsoever, arising out of any act or omission of the City, its officers, agents, employees, and subcontractors in performing the services under this MOU.
4.2 The City is not a contractor, agent or employee of LACMTA. The City shall not represent itself as a contractor, agent or employee of LACMTA and shall have no power to bind LACMTA in contract or otherwise.
4.3 The City agrees that expenditure of the Proposition A Discretionary Incentive funds will be used for projects that meet the eligibility, administrative, audit and lapsing requirements of the Proposition A and Proposition C Local Return guidelines most recently adopted by the LACMTA Board.
4.4 These expenditures will be subject to AUDIT as part of LACMTA’s annual Consolidated Audit.
ARTICLE 5. REMEDIES
5.0 LACMTA reserves the right to terminate this MOU and withhold or recoup funds if it determines that the City has not met the requirements specified by the FTA for collecting and submitting NTD statistics through LACMTA.
ARTICLE 6. MISCELLANEOUS
6.0 This MOU constitutes the entire understanding between the parties, with respect to the subject matter herein.
6.1 The MOU shall not be amended, nor any provisions or breach hereof waived, except in writing signed by the parties who agreed to the original MOU or the same level of authority.
ARTICLE 7. CONTACT INFORMATION
7.0 LACMTA's Address:
Los Angeles County Metropolitan Transportation Authority One Gateway Plaza
Los Angeles, CA 90012
Attention: Chelsea Meister (99-21-3)
[email protected]
7.1 City’s Address:
Baldwin Park
14403 E. Pacific Ave.
Baldwin Park,CA 91706
Attn: David Lopez
[email protected]
IN WITNESS WHEREOF, the City and LACMTA have caused this MOU to be executed by their duly authorized representatives on the date noted below:
CITY:
City of Baldwin Park Los Angeles County Metropolitan Transportation Authority
_________________________ By: ___________________________
STEPHANIE WIGGINS
Mayor/City Manager Chief Executive Officer
Date: ____________________ Date: _______________________
APPROVED AS TO FORM: APPROVED AS TO FORM:
DAWYN R. HARRISON
County Counsel
By: _____________________ By: ____________________
Legal Counsel Deputy
Date: ____________________ Date: __________________
ATTACHMENT A
LACMTA Voluntary NTD Reporting Program for FY '22
Using FY '24 FTA Formula Programs Apportionment Data Unit Values Jurisdiction MODE
Total Vehicle
Revenue Miles
Total Passenger
Miles
Total Operating
Costs $ from VRM $ from OPCOST Total Generated
Total ($)Due to
Jursd Before Tier
2 Deduction
Tier II
Operator
Deduction
Total ($)Due to
Jurisdiction
Glendale MB 870,564 1,065,127 10,532,283 597,627.59 6,185 603,812$ 603,812 (88,358) 515,454 Pasadena MB 656,127 1,849,723 7,691,950 450,420.18 25,540 475,960$ 475,960 (69,649) 406,311 LADOT COMMUNITY DASH MB 4,105,129 13,087,675 41,375,202 2,818,102 237,696 3,055,798$ 3,055,798 (447,165) 2,608,633 LADOT DEPARTMENT OF AGING DR 237,760 292,252 4,242,341 163,218 1,156 164,374$ 164,374 164,374 Total LADOT 4,342,889 13,379,927 45,617,543 2,981,320 238,852 3,220,173$ 3,220,173$ (447,165)$ 2,773,007$ - -
Total NTD 5307 Funds 5,869,580 16,294,777 63,841,776 4,029,368 270,577 4,299,945 4,299,945 (605,172) 7,994,717 -
FY25 Revenue Mile Rate
FY25 Passenger Mile Rate
0.6864832
0.0574166
ATTACHMENT A
LACMTA Voluntary NTD Reporting Program for FY22
Using FY24 FTA Formula Programs Apportionment Data Values Jurisdiction MODE
Total Vehicle
Revenue Miles $ from VRM
Tier II
Operator
Deduction
Total ($)Due to
Jurisdiction
Alhambra MB 158,987 109,141.91 109,142 Alhambra DR 98,869 67,871.91 67,872 Artesia DR (DT) 4,712 3,234.71 3,235 Azusa DR 56,416 38,728.64 38,729 Baldwin Park MB 183,638 126,064.41 126,064 Baldwin Park DR 26,715 18,339.40 18,339 Bell TD
Bell MB 33,271 22,839.98 22,840 Bell DR 16,347 11,221.94 11,222 Bellflower MB 71,986 49,417.18 49,417 Bellflower DR 14,205 9,751.49 9,751 Bell Gardens MB 98,902 67,894.56 67,895 Bell Gardens DR 25,856 17,749.71 17,750 Burbank MB 216,013 148,289.30 (21,700) 126,590 Calabasas MB 86,082 59,093.85 59,094 Calabasas DR 3,852 2,644.33 2,644 Carson MB 28,100 19,290.18 19,290 Carson TN
Carson DR 71,628 49,171.42 49,171 Cerritos MB 99,328 68,187.01 68,187 Cerritos DR 40,026 27,477.18 27,477 Compton MB 179,908 123,503.82 123,504 Compton DR 110 75.51 76 Covina DR 47,348 32,503.61 32,504 Cudahy MB 33,109 22,728.77 22,729 Cudahy DR 10,947 7,514.93 7,515 Downey MB 101,069 69,382.17 69,382 Downey DR 40,311 27,672.83 27,673 Duarte MB
El Monte MB 221,914 152,340.24 152,340 El Monte DR 60,076 41,241.17 41,241 Glendora MB 40,735 27,963.89 27,964 Glendora DR 39,545 27,146.98 27,147 Huntington Park MB 130,598 89,653.34 89,653 Huntington Park DT 42,309 29,044.42 29,044 LACDPWAvocado MB 39,286 26,969.18 26,969 LACDPWELA MB 211,455 145,160.31 145,160 LACDPWELA DR 39,971 27,439.42 27,439 LACDPWEast Valinda MB 44,182 30,330.20 30,330 LACDPWKing Medical MB 33,586 23,056.23 23,056 LACDPWWillowbrook Shuttle MB 70,091 48,116.30 48,116 LACDPWS.Whittier MB 183,982 126,300.56 126,301 LACDPWAthens MB 36,912 25,339.47 25,339 LACDPWLennox MB 27,669 18,994.30 18,994 LACDPWFloranceFirestone MB 58,082 39,872.32 39,872 Lakewood DR 54,228 37,226.61 37,227 Lawndale MB
Lynwood MB 140,961 96,767.36 96,767 Malibu DT 2,764 1,897.44 1,897 ManhattanBeach DR 23,747 16,301.92 16,302 Maywood MB 32,291 22,167.23 22,167 Maywood DR 15,175 10,417.38 10,417 MontereyPark MB 116,534 79,998.64 79,999 MontereyPark DR 24,919 17,106.48 17,106 Pico Rivera DR 17,166 11,784.17 11,784 Rosemead MB 100,780 69,183.78 69,184 Rosemead DR 38,611 26,505.80 26,506 Santa Fe Springs DR 14,694 10,087.18 10,087 South Gate MB 114,106 78,331.86 78,332 South Gate DT 116,358 79,877.59 79,878 SouthPasadena DR 27,187 18,663.42 18,663 WestCovina MB 141,973 97,462.08 97,462 WestCovina DR 44,452 30,515.55 30,516 West Hollywood MB 114,998 78,944 78,944 Total 4,054,074 2,783,054 (21,700) 2,761,354 FY25 Revenue Mile Rate 0.68648
DID NOT REPORT FOR 2023
DID NOT REPORT FOR 2023
DID NOT REPORT FOR 2023
DID NOT REPORT FOR 2023
ITEM NO: 6.
STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Manuel Carrillo Jr, Chief Executive Officer
PREPARED BY: Karina Rueda, Human Resources/Risk Manager DATE: September 3, 2025
SUBJECT: Approval of Resolution 2025-033 to Approve the Revisions of the Engineering Manager and Community Service Officer
Job Descriptions
SUMMARY:
This report requests City Council to approve a Resolution to revise the Engineering Manager and Community Service Officer job descriptions, with no changes to the existing salary range.
RECOMMENDED ACTION:
It is recommended that the City Council approve and adopt Resolution 2025-033 to update the Engineering Manager and Community Service Officer job descriptions subject to any non-substantive changes made by the Chief Executive Officer and the City Attorney.
FISCAL IMPACT:
There is no fiscal impact associated with this item.
BACKGROUND:
Public Works Department
Human Resources in collaboration with the Public Works Department and the Classified Management Employee Association (CMEA) is recommending changes the existing job description for Engineering Manager to align with operational needs and recruitment efforts. The minimum qualifications were revised to help attract and recruit potential qualified applicants based on years of experience in the field.
Police Department
On June 4, 2025, City Council approved the Measure BP Stakeholder Oversight Committee’s (SOC) recommendation for funding approval of two (2) Community Service Officer positions to address minor public safety matters inherent to city parks and plazas as well as other city-sponsored community events. To address the public safety needs of the community, Human Resources in collaboration with the Police Department and the Baldwin Park Police Officers Association (POA), is recommending changes to the existing Community Service Officer job description to align with community and departmental operational needs. The revisions to the job description will assist recruitment efforts by attracting and recruiting qualified candidates.
DISCUSSION:
None.
ALTERNATIVES:
No alternatives are recommended.
CEQA REVIEW:
None
LEGAL REVIEW:
This report does not require legal review.
ATTACHMENTS:
1. Engineering Manager Job Description_Redline
2. Community Service Officer_Redline
3. Resolution No. 2025-033 - Update Engineering Manager and Community Services Office job descriptions
Engineering Manager Baldwin Park CA 1 of 3
JOB DESCRIPTION
Engineering Manager
Revised:
Revised:
January 21, 2015
September 3, 2025
Position Code:
Group:
FLSA:
31010
CMEA
Exempt
SUMMARY
Under general direction, helps, to organizes, plans, coordinates, manages, and supervises engineering activities within the Public Works Department; coordinates engineering activities with other divisions and departments; coordinates and supervises field operations with Public Works Supervisorsstaff; takes a leadership role in implementation of the goals and objectives of the Public Works Department; and provides highly complex staff assistance to the Director of Public Works.
SUPERVISION RECEIVED AND EXERCISED
Receives general direction from the Director of Public Works.
May Eexercises direct supervision over assigned staff. Associate and Assistant Engineer, Public Works Coordinator, Public Works Supervisor and assigned clerical, technical personnel.
ESSENTIAL FUNCTIONS: Duties may include, but are not limited to, the following: May include any of the following representative duties, knowledge, and skills. This is not a comprehensive listing of all functions and duties performed by incumbents of this class; employees may be assigned duties which are not listed below; reasonable accommodations will be made as required. The job description does not constitute an employment agreement and is subject to change at any time by the employer. Essential duties and responsibilities may include, but are not limited to, the following:
• Supervises and participates in a variety of professional and sub -professional engineering work, including the preparation of plans and project specifications; directs and/or coordinates project inspections; drafts ordinances according to general instruction. • Plans, organizes and direct s engineering activities including, but are not limited to, the capital improvement program, land development projects, traffic engineering, and assessment engineering. • Supervises and participates in the review of plans; evaluates compliance with laws, ordinances, and acceptable engineering standards, and recommends corrections or improvements; supervises the preparation of legal descriptions and deeds for easements and rights-of-way. • Prepares and evaluates requests for proposals relating to projects requiring contract -engineering work; directs the preparation of project cost estimates for competitive bidding purposes; reviews plans of consulting/engineering firms performing work for the City and evaluates their performance; performs construction contract modifications and negotiates contract changes and change order costs.
• Compiles and analyzes statistical data and prepares technical reports relating to public works projects and programs; assists in the preparation of cost projects for the department budget and monitors expenditures.
• Recommends and assists in the implementation of goals and objectives; establishes schedules and methods for engineering projects; implements policies and procedures. • Coordinates the activities of the engineering staff and Public Works Supervisors. • Develops and implements the development of the engineering work plan; assigns work activities, projects and programs; monitor s workflow; reviews and evaluates work products, methods and procedures.
Engineering Manager Baldwin Park CA 2 of 3
• Participates in budget preparation and administration; prepare s cost estimates for budget recommendations; submits justifications for staffing, equipment, materials and supplies; monitors and controls expenditures; administers the approved budget. • Participates in recommending the appointment of personnel; provides or coordinates staff trainings; conducts performance evaluations; recommend discipline; implement s discipline procedures as directed; maintains discipline and high standards necessary for the efficient and professional operation of the Ddepartment.
• Answers questions and provides information to the public; investigates complaints and recommends corrective action as necessary to resolve complaints.
• Research and prepares technical and administrative staff reports; prepares written correspondence. • Build and maintain positive working relationships with co- workers, other City employees and the public using principles of good customer service.
• Perform related duties as assigned.
• Supports the relationship between the City of Baldwin Park and the general public by demonstrating courteous and cooperative behavior when interacting with visitors and City staff; maintains confidentiality of work -related issues and City information; performs other duties as required or assigned.
Knowledge of:
• Principles and practices of engineering, public works construction and urban and regional planning. • Principles and practices of public works contract administration, land development and capital improvement.
• Principles and practices of leadership, motivation, team building and conflict resolution. • Principles and practices of business correspondence and technical report writing. • Pertinent local, State, and Federal laws, rules and regulations. • Budgeting procedures and techniques.
• Principles and practices of supervision, training and personnel management. • Modern office procedures and computer equipment.
Ability to:
• Organize, direct and implement a comprehensive engineering program. • O n a continuous basis, analyze technical reports; interpret and evaluate staff reports; know laws, regulations, and codes; observe performance and evaluate staff; problem solve department related issues; remember various rules; and explain and interpret policy. • On a continuous basis, sit at desk and in meetings for long periods of time. Intermittently reach equipment surrounding desk; perform duties in the field including climbing and bending; perform simple grasping and fine manipulation; use telephone and communicate through written means. • Assist in preparing and administering a budget.
• Supervise, train, and evaluate personnel.
• Develop and recommend policies and procedures related to assigned operations. • Interpret and explain policies and procedures.
• Analyze problems, identify alternative solutions, project consequences of proposed actions and implement recommendations in support of goals.
• Gain cooperation through discussion and persuasion.
• Establish and maintain effective working relationships with those contacted in the course of work. • Communicate clearly and concisely, both orally and in writing. • Prepare construction plans using AutoCAD
MINIMUM QUALIFICATIONS:
EDUCATION, TRAINING, AND EXPEREINCE GUIDELINES:
Engineering Manager Baldwin Park CA 3 of 3
• Equivalent to a Bachelor’s degree from an accredited college or university with major coursework in civil engineeringCivil Engineering, public administrationPublic Administration, or a related field. • Four Six (6) years of increasingly responsible professional experience in civil engineering, including one year of lead responsibility..
LICENSE AND CERTIFICATION REQUIREMENTS:
• Possession of, or ability to obtain, a valid applicable California driver’s license. • Certification as an Engineer-In-Training (EIT) by the California State Board for Professional Engineers, Land Surveyors, and Geologists is desirable.
Community Service Officer Baldwin Park CA 1 of 3
JOB DESCRIPTION
Community Service Officer
Revised: September 3, 2025
Position Code:
Group:
FLSA:
51029
POA
Non-Exempt
SUMMARY
Under general supervision, performs a variety of non- hazardous duties in a non- sworn capacity and in support of Police Department operations, services, and functions, including but not limited to, the areas of patrol, traffic control, parking enforcement, community policing, records, and investigations; support duties as a non -sworn, non-peace officer in an assigned division of the Police Department; performs related clerical tasks; performs related duties as required.a variety of other duties based on the needs of the department including those related to special assignments.
SUPERVISION RECEIVED AND EXERCISED
General supervision is provided by designated sworn personnel.
ESSENTIAL FUNCTIONS: -- May include any of the following representative duties, knowledge, and skills. This is not a comprehensive listing of all functions and duties performed by incumbents of this class; employees may be assigned duties which are not listed below; reasonable ac commodations will be made as required. The job description does not constitute an employment agreement and is subject to change at any time by the employer. Essential duties and responsibilities may include, but are not limited to, the following:
• Provides visible uniformed presence/patrol either on foot or in a vehicle at City parks as a crime deterrent, may investigate quality of life complaints and initiates nuisance abatement investigations related to City parks/property and businesses, cites violator; monitors locations, prepares reports. • May investigate and write complete crime reports when no suspect is present in the field; investigates complaints and cites violator; prepares reports; investigates selected traffic collisions and other incidents as assigned.
• May be assigned to investigate cases of missing persons, adult and juvenile misdemeanor arrests and status offenders, cases of lost and found property; provides limited advisory assistance and referral services to victim and families; files charges or recommends other appropriate actions, performs court liaison duties in the absence of the court liaison officer.. • May issue parking citations; enforce laws and regulations applicable to non- moving vehicles; write citations for illegal parking; assist in identifying and removing/impounding stolen and/or abandoned vehicles/trailers; assists stranded motorists; performs traffic control; reports observed traffic hazards. • May collect and preserve evidence in accordance with established procedures; photograph crime scenes; perform fingerprinting and book prisoners; assist in the care and custody of prisoners; inventories, tags, and disposes of evidence and found property., and releases evidence to court and other parties and transports for analysis or disposal; organizes and conducts auctions. • May conduct City Neighborhood Watch and other crime prevention programs; participates in department activities/events, schedule activities and provides liaison to participating agencies and groups; composes informational materials, newsletters, and public service announcements for a variety of media as needed.
• May issue parking citations; assists in the inspections of commercial vehicles; performs traffic control; report observed traffic hazards; initiates impound action on abandoned vehicles; assists stranded motorists; may act as a crossing guard.
Community Service Officer Baldwin Park CA 2 of 3
• May provide skilled support in assistance to the public, in person or by phone, providing information relative to departmental policy and procedures; creates records of crime reports and complaints; may serve subpoenas; may appear in court to provide testimony. • May perform a variety of general clerical tasks in the performance of non- hazardous duty, including typing, compiling and tabulating statistical data; operates office equipment, including standard typewriters, word processing equipment, or a computer remote terminal; maintains related files and records; assists in dispatching duties. a remote computer terminal and a police radio. • Perform related duties as assigned. Supports the relationship between the City of Baldwin Park and the general public by demonstrating courteous and cooperative behavior when interacting with visitors and City staff; maintains confidentiality of work -related issues and City information; performs other duties as required or assigned.
Knowledge of:
• English usage, spelling, grammar, punctuation, and arithmetic. • Effective public relations and personal interaction skills. • Basic functions of a municipal law enforcement agency. • Principles and practices of customer service.
• Geography, roads, and landmarks of the City and surrounding areas.
Ability to:
• Operate a variety of police vehiclesdepartment vehicle in a lawful and safe manner. • Learn and apply basic criminal, traffic, and civil law pursuant to department training. • Understand, interpret, and apply pertinent federal, state, and local codes, laws, and regulations, including, vehicle codes, penal codes, and municipal codes. • Learn a variety of automated systems.
• Deal constructively with conflict , physical threats, verbal abuse, other stressful situations and develop/initiate effective resolutions.
• Understand and follow verbal and written directions.
• Write neat, concise, and thorough reports.
• Work independently.
• Work cooperatively and effectively with others and promote a professional image of the Ddepartment.
MINIMUM QUALIFICATIONS:
EDUCATION, TRAINING, AND EXPEREINCE GUIDELINES:
Any combination equivalent to experience and education that could likely provide the required knowledge and abilities would be qualifying. A typical way to obtain the knowledge and abilitiesy would be:
• Graduation from high school or equivalent.High School Diploma or GED equivalent. • Graduation from an accredited college with an AA Degree in a related field is desirable. • Recent employment in a job requiring extensive public interaction. Prior Police Cadet and/or Police Explorer Scout desirable.One (1) year of clerical experience involving public contact preferably in a law enforcement agency.
LICENSE AND CERTIFICATION REQUIREMENTS:
• Possession of, or ability to obtain, a valid applicable California State Ddriver’s Llicense.
• Possession of Peace Officer Standards and Training (POST) PC 832 (Powers of Arrest) certification or successfully complete the 832 PC course within three (3) months of hire.
PHYSICAL DEMANDS AND WORKING ENVIRONMENT
Work is performed in a standard office environment and in the field; may stand, sit, walk for prolonged periods of time. May be exposed to loud noise levels, cold, hot, and inclement weather conditions. Must
Community Service Officer Baldwin Park CA 3 of 3
be available to work varying work schedules depending on the needs of the department, with work schedules being adjusted periodically. May involve fixed or rotating shifts, including, holidays, weekends, evenings, and extended hours when required. Must be able to lift, carry, push, and pull materials and objects up to 50lbs.
RESOLUTION NO. 2025-033
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN
PARK APPROVING REVISIONS TO CERTAIN JOB DESCRIPTIONS
IN ACCORDANCE WITH APPLICABLE RULES AND REGULATIONS.
WHEREAS, the job descriptions for Engineering Manager and Community Service Officer have been revised to more accurately reflect the full range of duties, responsibilities, competencies, and minimum qualifications to meet operational needs; and
WHEREAS, the Engineering Manager and Community Service Officer job descriptions have been revised; and
WHEREAS, the City of Baldwin Park has attached the job descriptions referred to as Exhibit A.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES HEREBY RESOLVE AND ORDER AS FOLLOWS:
Section 1. The City Council hereby approves the revision of the Engineering Manager and Community Service Officer job descriptions, attached hereto to as Exhibit
PASSED, APPROVED, AND ADOPTED this 3rd day of September, 2025.
_______________________________
ALEJANDRA AVILA
MAYOR
[ATTESTION ON THE NEXT PAGE]
ATTEST:
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES SS:
CITY OF BALDWIN PARK
I, Christopher Saenz , City Clerk of the City of Baldwin Park do hereby certify that the foregoing Resolution No. 2025-033 was duly adopted by the City Council of the City of Baldwin Park at a regular meeting thereof held on September 3, 2025 and that the same was adopted by the following vote to wit:
AYES:
NOES: :
ABSENT:
ABSTAIN:
CHRISTOPHER SAENZ
CITY CLERK
ITEM NO: 7.
STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Manuel Carrillo Jr, Chief Executive Officer
PREPARED BY: Nick Baldwin, City Planner
DATE: September 3, 2025
SUBJECT: Consideration to Approve Resolution No. 2025-032 Adopting a Mitigated Negative Declaration (MND) and Mitigation,
Monitoring, and Reporting Program (MMRP) as well as the approval of the concept design for the Roadside Park
Project
SUMMARY:
The purpose of this staff report is to request City Council approval of Resolution No. 2025-032, adopting the Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP), as well as approving the concept design for the Roadside Park Project.
This action is required to ensure compliance with the National Park Service guidelines for the $2.1 million competitive grant awarded last year for the development of Roadside Park, located adjacent to Kaiser Hospital.
The grant funds will support improvements for the park’s development. To meet eligibility requirements for this funding, an Initial Study/Mitigated Negative Declaration was prepared in accordance with the California Environmental Quality Act (CEQA).
RECOMMENDED ACTION:
It is recommended that the City Council:
1. Adopt Resolution No. 2025-032 entitled, “A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK APPROVING AND ADOPTING (1) AN INITIAL STUDY AND
MITIGATED NEGATIVE DECLARATION AND MITIGATION MONITORING AND
REPORTING PROGRAM FOR THE BALDWIN PARK ROADSIDE PARK PROJECT LOCATED AT 1081 LEORITA ST.”
2. Authorize the Director of Recreation and Community Services to apply for grant funding for park improvements based on the conceptual improvements shown on the Site Plan and described in the IS/MND.
FISCAL IMPACT:
There would be no adverse fiscal impact associated with adoption of the Mitigated Negative Declaration and Mitigation, Monitoring, and Reporting Program for the Baldwin Park Roadside Park Project.
BACKGROUND:
None
DISCUSSION:
None.
ALTERNATIVES:
None.
CEQA REVIEW:
CALIFORNIA ENVIROMENTAL QUALITY ACT (CEQA)
The Project is being implemented by the City to address the City’s environmental efforts and expand recreational facilities. This Project aims to develop the existing surface basin area that takes drainage from the nearby roadways including Caltrans Highway into a subsurface stormwater capture and infiltration system with park features on the surface. The City is committed to maximizing community benefits through the Project. Amenities are expected to include a nature-based playground, shade structure, outdoor fitness equipment, picnic areas, native plants and pollinator garden, restroom facility, irrigation system and walking path with solar lighting, recycled benches and tables, and open green space. The park will also include approximately 17 new large shade trees, native plants and shrubs, permeable walkways, and stormwater capture bioswales and an underground water infiltration system to recharge this region’s groundwater table. The conceptual layout of the Project is included within the IS/MND in Attachment 1.
The City is a participant in the Upper San Gabriel River (USGR) Watershed Management Group (WMG), which is composed of the County of Los Angeles (County), Los Angeles County Flood Control District (LACFCD), and the Cities of Baldwin Park, Covina, Glendora, Industry, La Puente, and West Covina. The USGR WMG developed the USGR Enhanced Watershed Management Program (EWMP) Plan, which identified projects to improve water quality. The Project may support the EWMP Plan’s stormwater planning goals including reusing stormwater, enhancing flood control, promoting water conservation efforts, improving water quality, and increasing water supplies.
The Project goals are summarized as follows:
• Increase recreational park space
• Promoting groundwater recharge
• Enhance water quality
• Maximize community benefits
• Minimize disruption to residents and local businesses • Incorporate community-based input
Pursuant to the California Environmental Quality Act (CEQA), the City of Baldwin Park (“City”) prepared a Draft Initial Study/Mitigated Negative Declaration (IS/MND) to identify potential site-specific environmental constraints associated with the Baldwin Park Roadside Park Project (Project) (1081 Leorita Street, Baldwin Park, California 91706). The Draft Initial Study determined that the project could result in potentially significant impacts to the following environmental topics: aesthetics, agriculture and forestry resources, air quality, biological resources, cultural resources, energy, geology/soils, greenhouse gas emissions, hazards and hazardous materials, hydrology/water quality, land use/planning, mineral resources, noise, population/housing, public services, recreation, transportation, tribal cultural resources, utilities/service systems, wildfire, and mandatory findings of significance. Since all potentially significant impacts could be fully mitigated, the project qualifies for a Mitigated Native Declaration (MND) and therefore would not require the preparation of an Environmental Impact Report (EIR) pursuant to CEQA.
On July 22, 2025, the city released for public review the Draft IS/MND for the project pursuant to Section 15105 of the State CEQA Guidelines. The public review and comment period for the Draft IS/MND began on July 22, 2025 and closed on August 21, 2025. A Notice of Intent to adopt the IS/MND for the project was recorded with the Office of Planning and Research, and the Los Angeles County Recorder’s office, circulated to interested parties, and posted on the City’s website along with the Draft IS/MND. Notices with links to the document were
also made available for viewing at the Baldwin Park library, community center, and at the City’s Headquarters located at 14403 E. Pacific Ave. As required by CEQA, a Notice of Completion form along with copies of the Draft IS/MND were sent to the State Clearinghouse soliciting review and comment on the report by the relevant State agencies. The State Clearinghouse subsequently assigned the following State Clearinghouse Number for the Draft IS/MND: 2025070965.
The CEQA Appendix G Environmental (Initial Study) Checklist is included in Section 3. The checklist identifies potential environmental impacts by section and provides a brief discussion of each impact resulting from project implementation, with responses supported by sufficient data and analysis. During the public review period, comments were received from:
• Brandy Salas, Gabrieleño Band of Mission Indians - Kizh Nation • Kristen Way, State Department of Parks and Recreation • Miya Edmonson, California Department of Transportation
A Final IS/MND was prepared to address the comments from Brandy Salas, Gabrieleño Band of Mission Indians - Kizh Nation and Kristen Way, Department of Parks and Recreation, and California Department of Transportation.
The key findings based on the comments received during the Draft IS/MND includes:
• The Final IS/MND incorporates updated mitigation measures based on the comments received and relate to the following: TCR-1 through TCR-3 to ensure proper tribal monitoring, procedures for unanticipated discoveries of tribal cultural resources and human remains, and compliance with applicable state laws; Clarifications were made regarding responsible party references, the designation of the Most Likely Descendant (MLD) has been revised; the status of the habitat assessment under Mitigation Measure BIO-1; Caltrans noted Parcel 980592-1 includes an existing drainage basin that is onsite, the capacity of which will be retained in subsurface systems in the final design to support the drainage from the frontage road; Caltrans also encourages multi-modal infrastructure, including ADA-compliant sidewalks, high-visibility crosswalks, Class IV bike lanes, and bike parking and may be included as part of the design documents as applicable. As appropriate, each section has discussion that describes and identifies specific impacts anticipated with project implementation.
In addition to the responses to comments, the Final IS/MND includes the Updated IS/MND and a Mitigation, Monitoring, and Reporting Program (MMRP) and incorporates the Draft IS/MND by reference. An Environmental Impact Report (EIR) pursuant to CEQA is not required for the proposed project. Minor edits to the Draft IS/MND were required based on the comments that were received and included in the Final IS/MND. The Final IS/MND does not describe a project having any new or substantially more severe impacts than those identified and analyzed in the Draft IS/MND. Therefore, in accordance with State CEQA Guidelines Section 15073.5, recirculation of a Draft IS/MND is not required.
The Final IS/MND is an informational document that (1) must be considered by the City’s decisionmakers before approving the project, and (2) must reflect the Lead Agency’s independent judgment and analysis (CEQA Guidelines, Section 15090). The City must first adopt the IS/MND and approve the MMRP prior to approving the project. If the City formally approves the project, the City shall file a CEQA Notice of Determination with the County Clerk within five working days of project approval. A copy of the Notice of Determination filed by the County Clerk shall also be sent to the State Clearinghouse.
CONCLUSION
Based on the findings of the Initial Study, it is recommended that the city council approve Resolution No. 2025- 032 Adopting a Mitigated Negative Declaration for the Baldwin Park Roadside Park Project.
LEGAL REVIEW:
This report has been reviewed and approved by the City Attorney as to legal form and content.
ATTACHMENTS:
1. Resolution No. 2025-032
2. Initial Study/Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program
3. Conceptual Site Plan
4. 25-09-03 Baldwin Park Roadside Park MND Report REVISED
RESOLUTION NO. 2025-032
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
BALDWIN PARK APPROVING AND ADOPTING ( 1) AN
INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION
AND MITIGATION MONITORING AND REPORTING
PROGRAM FOR THE BA LDWIN PARK ROADSIDE PARK
PROJECT LOCATED AT 1081 LEORITA ST.
WHEREAS, pursuant to the California Environmental Quality Act (Public Resources Code, § 21000 et seq.), the State CEQA Guidelines (California Code of Regulations, title 14, § 15000 et seq.), and City of Baldwin Park’s Local CEQA Guidelines (collectively, “CEQA”), the City of Baldwin Park is the lead agency for the proposed Project; and
WHEREAS, in July 2025 , in compliance with CEQA, an Initial Study (IS) was prepared for the Project which determined the Project will not have a significant adverse impact on the environment and that a Mitigated Negative Declaration (MND) finding is appropriate; and
WHEREAS the City provided copies of the Initial Study and MND to the public and the State Clearinghouse for a review and comment period beginning on July 22, 2025, and ending on August 21, 2025 , pursuant to State CEQA Guidelines section 15073, during which time the City received three (3) comment letters; and
WHEREAS, on July 22, 2025, the City gave public notice of the City Council public meeting on the Project to property owners within a 300-foot distance; and
WHEREAS, in accordance with State CEQA Guidelines section 15073(e), on July 22, 2025, the City provided written notice to all public agencies that commented on the proposed MND of the public meeting to be held on the Project for which the MND was prepared; and
WHEREAS, on September 3, 2025 , the City Council held a public meeting and considered public testimony and evidence and recommendations presented by staff related to the proposed Project and the MND for the Project; and
WHEREAS, all the requirements of the Public Resources Code, the State CEQA Guidelines, and the City’s Local CEQA Guidelines have been satisfied by the City in connection with the preparation of the MND, which is sufficiently detailed so that all of the potentially significant environmental effects of the Project, as well as feasible mitigation measures, have been adequately evaluated; and
Resolution CC 2025-032
September 3, 2025
WHERAS, the MND prepared in connection with the Project sufficiently analyzes the feasible mitigation measures necessary to avoid or substantially lessen the Project’s potentially significant environmental impacts; and
WHERAS, the findings and conclusions made by the City Council in this Resolution are based upon the oral and written evidence presented as well as the entirety of the administrative record for the Project, which is incorporated herein by this reference.
The findings are not based solely on the information provided in this Resolution; and
WHEREAS, prior to taking action, the City Council has heard, been presented with, reviewed, and considered all of the information and data in the administrative record, including but not limited to the Initial Study, MND, MMRP, and all oral and written evidence presented to it during all meetings and hearings; and
WHEREAS, the MND, reflects the independent judgment of the City and is deemed adequate for purposes of making decisions on the merits of the Project; and
WHEREAS, no comments made in the public meeting conducted by the City Council, and no additional information submitted to the City Council, have produced substantial new information requiring substantial revisions that would trigger recirculation of the MND or additional environmental review of the proj ect under State CEQA Guidelines section 15073.5; and
WHERAS, all other legal prerequisites to the adoption of this Resolution have occurred.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BALDWIN PARK, DOES HEREBY RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS:
SECTION 1. RECITALS. The City Council hereby finds that the recitals set forth above are true and correct and are incorporated herein as substantive findings of this Resolution.
SECTION 2. COMPLIANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT. As the decision -making body for the Project, the City Council has reviewed and considered the information contained in the MND, Initial Study, administrative record, and all other written and oral evidence presented to the City for the Project, on file with the City and available for review at 14403 E Pacific Ave. Based on the City Council’s independent review and analysis, the Cit y Council finds that the MND Initial Study, and administrative record contain a complete and accurate reporting of the environmental impacts associated with the Project, and that the MND has been completed in compliance with the California Environmental Quality Act (Public Resources Code, § 21000 et seq.; “CEQA”), the State CEQA Guidelines (California Code of Regulations, title 14, § 15000 et seq.), and the City’s Local CEQA Guidelines.
Resolution CC 2025-032
September 3, 2025
SECTION 3. FINDINGS ON ENVIRONMENTAL IMPACTS. Based on the whole record before it, including the MND, Initial Study, the administrative record, and all other written and oral evidence presented to the City Council, the City Council finds that all environmental impac ts of the Project are either less than significant or no impact as outlined in the MND, and the Initial Study. The City Council further finds that there is no substantial evidence in the administrative record supporting a fair argument that the Project may result in any significant environmental impacts. The City Council finds that the MND, contains a complete, objective, and accurate reporting of the environmental impacts associated with the Project and reflects the independent judgment and analy sis of the City. No new significant environmental effects have been identified in the Final MND and no changes made to the MND constitute substantial revisions requiring recirculation under State CEQA Guidelines section 15073.5.
SECTION 4. ADOPTION OF THE MITIGATED NEGATIVE DECLARATION. The City hereby approved and adopts the MND, which is hereby attached to this Resolution as Exhibit “A”.
SECTION 5. ADOPTION OF THE MITIGATION MONITORING AND REPORTING PROGRAM. In accordance with the Public Resources Code section 21081.6, the City Council hereby adopts the MMRP, which is hereby attached to this Resolution as Exhibit “B”. In the event of any inconsisten cies between the Mitigation measures as set forth in the MND and the MMRP, the MMRP shall control.
SECTION 6. LOCATION AND CUSTODIAN OF RECORDS. The documents and materials associated with the Project and the MND that constitute the record of proceedings on which these findings are based are located at 14403 E. Pacific Ave.
SECTION 7. NOTICE OF DETERMINATION. The City Council hereby directs staff to prepare and file a Notice of Determination with the Los Angeles County Clerk and the State Clearinghouse within five (5) working days of the approval of the proposed Project.
Resolution CC 2025-032
September 3, 2025
PASSED AND APPROVED this 3rd day of September, 2025.
_____________________________________
ALEJANDRA AVILA
MAYOR
ATTEST:
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES ss.
CITY OF BALDWIN PARK
I, CHRISTOPHER SAENZ, Clerk of the Baldwin Park City Council, do hereby certify that the foregoing Resolution No. 2025-032 was duly and regularly approved and adopted by the City Council at a regular meeting thereof, held on the 3rd day of September, 2025 by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
________________________________________
CHRISTOPHER SAENZ
CITY CLERK
Initial Study and Mitigated
Negative Declaration
City of Baldwin Park
Roadside Park Project
State Clearinghouse No. 2025070965
1561 E. Orangethorpe Avenue, Suite 240
Fullerton, California 92831
TEL (714) 526-7500 | FAX (714) 526-7004
www.cwecorp.com
Initial Study and
Mitigated Negative Declaration
Roadside Park Project
State Clearinghouse No. 2025070965
Prepared for:
City of Baldwin Park
14403 E. Pacific Avenue
Baldwin Park, California 91706
TEL (626) 813 5269
Prepared by:
1561 E. Orangethorpe Avenue, Suite 240
Fullerton, California, 92831
TEL (714) 526-7500 | FAX (714) 526-7004 | www.cwecorp.com
August 2025
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- i -
Table of Contents
TABLE OF CONTENTS .................................................................................................................. i LIST OF FIGURES .......................................................................................................................ii LIST OF TABLES ..........................................................................................................................ii ACRONYMS ................................................................................................................................iii
1. INTRODUCTION ............................................................................................................... 1
1.1 PURPOSE AND DOCUMENT ORGANIZATION................................ ................................ .................... 1
1.2 SUMMARY OF FINDINGS ................................ ................................ ................................ .......... 1
2. PROJECT DESCRIPTION .................................................................................................. 2
2.1 PROJECT LOCATION ................................ ................................ ................................ ............... 4
3. INITIAL STUDY/ENVIRONMENTAL CHECKLIST .............................................................. 5
3.1 AESTHETICS ................................ ................................ ................................ ........................ 8
3.2 AGRICULTURE AND FORESTRY RESOURCES ................................ ................................ ................. 10
3.3 AIR QUALITY ................................ ................................ ................................ ..................... 12
3.4 BIOLOGICAL RESOURCES ................................ ................................ ................................ ....... 15
3.5 CULTURAL RESOURCES ................................ ................................ ................................ ......... 18
3.6 ENERGY ................................ ................................ ................................ ........................... 21
3.7 GEOLOGY AND SOILS ................................ ................................ ................................ ........... 22
3.8 GREENHOUSE GAS EMISSIONS ................................ ................................ ................................ 25
3.9 HAZARDS AND HAZARDOUS MATERIALS ................................ ................................ ..................... 26
3.10 HYDROLOGY AND WATER QUALITY ................................ ................................ ....................... 28
3.11 LAND USE AND PLANNING ................................ ................................ ................................ .. 30
3.12 MINERAL RESOURCES ................................ ................................ ................................ ....... 31
3.13 NOISE ................................ ................................ ................................ .......................... 32
3.14 POPULATION AND HOUSING ................................ ................................ ................................ 40
3.15 PUBLIC SERVICES ................................ ................................ ................................ ............ 41
3.16 RECREATION ................................ ................................ ................................ .................. 43
3.17 TRANSPORTATION/TRAFFIC ................................ ................................ ................................ 44
3.18 TRIBAL CULTURAL RESOURCES ................................ ................................ ............................ 46
3.19 UTILITIES AND SERVICE SYSTEMS ................................ ................................ ......................... 50
3.20 WILDFIRE ................................ ................................ ................................ ..................... 52
3.21 MANDATORY FINDINGS OF SIGNIFICANCE ................................ ................................ ............... 53
4. REFERENCES .................................................................................................................. 55
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- ii -
List of Figures
Figure 2-1 Project Location ................................ ................................ ................................ ............ 4 Figure 3-1 Noise Measurement Locations ................................ ................................ ....................... 34
List of Tables
Table 3-1 Daily Emissions for Construction of the Project ................................ ................................ . 13 Table 3-2 Greenhouse Gas Emissions for Project ................................ ................................ ............ 25 Table 3-3 Noise Assessment Results ................................ ................................ .............................. 33 Table 3-4 City of Baldwin Park Land Use Guidelines for Exterior Noise ................................ ................ 35 Table 3-5 Construction Equipment Noise Emission Levels ................................ ................................ . 36 Table 3-6 Construction Equipment Vibration Reference Levels ................................ .......................... 39
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- iii -
Acronyms
AQMP Air Quality Management Plan
BMP Best Management Practice
CCR California Code of Regulations
CDFW California Department of Fish and Wildlife
Caltrans California Department of Transportation
CEQA California Environmental Quality Act
CO Carbon Monoxide
CRHR California Register of Historic Resources
dBA Maximum A-Weighted Decibels
EIR Environmental Impact Report
EWMP Enhanced Watershed Management Program
FEMA Federal Emergency Management Agency
FHWA Federal Highway Administration
FMMP Farmland Mapping and Monitoring Program
GHG Greenhouse Gas
IPaC Information for Planning and Conservation
IS/MND Initial Study/Mitigated Negative Declaration
LACFCD Los Angeles County Flood Control District
LARWQCB Los Angeles Regional Water Quality Control Board MLD Most Likely Descendant
MRZ Mineral Resource Zone
MT Metric Tons
NAAQS National Ambient Air Quality Standards
NAHC National American Heritage Commission
NOx Nitrogen Oxides
PM Particulate Matter
PPV Peak Particle Velocity
PRIMP Paleontological Resources Impact Mitigation Program SCAB South Coast Air Basin
SCAQMD South Coast Air Quality Management District
SCCIC South Central Coastal Information Center
SLF Sacred Lands File
SMARA Surface Mining and Reclamation Act of 1975
SOx Sulfur Oxides
SVP Society of Vertebrate Paleontology
USACE United States Army Corps of Engineers
USDA United States Department of Agriculture
USFWS United States Fish and Wildlife Services
USGR Upper San Gabriel River
WEAP Worker Environmental Awareness Program
WMG Watershed Management Group
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 1 -
1. Introduction
This California Environmental Quality Act (CEQA) Initial Study/Mitigated Negative Declaration (IS/MND) has been prepared on behalf of the City of Baldwin Park (City) to identify potential site-specific environmental constraints associated with the Roadside Park Project (Project) located at 1081 Leorita Street in the City of Baldwin Park. This document has been prepared in accordance with CEQA (Public Resources Code §21000 et seq.), and the State CEQA Guidelines (Title 14, California Code of Regulations (CCR) §15000 et seq).
This IS/MND is intended for use by the City and members of the general public as a preliminary analysis to determine if there is substantial evidence that the Project may have significant effects on the environment. If site-specific environmental constraints are found to potentially have a significant effect on the environment, with mitigation, a site-specific Environmental Impact Report (EIR) should be prepared; otherwise, the lead agency may adopt a negative declaration or MND. This IS/MND was compiled for the City with the assistance of CWE. The City is serving as the Lead Agency for the proposed Project pursuant to CEQA §21067 and CEQA Guidelines Article 4 and §15367. “Lead Agency” refers to the public agency that has the principal responsibility for carrying out or approving a Project.
1.1 Purpose and Document Organization
The purpose of this document is to evaluate the potential environmental effects of the proposed Project.
Mitigation measures, if required, have been incorporated into the Project to eliminate potential significant impacts or reduce them to a less-than-significant level.
This IS/MND is organized as follows:
Section 1 – Introduction
Section 2 – Project Description
Section 3 – Initial Study/Environmental Checklist
Section 4 – References
1.2 Summary of Findings
The CEQA Appendix G Environmental (Initial Study) Checklist is included in Section 3. The Initial Study Checklist identifies potential environmental impacts, by sections, and provides a brief discussion of each impact resulting from implementation of the proposed Project. Each response confirmed as applicable in the environmental checklist is discussed and supported with sufficient data and analysis as necessary. As appropriate, each section has discussion that describes and identifies specific impacts anticipated with project implementation.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 2 -
2. Project Description
The Project is being implemented by the City to address the City’s environmental efforts and expand recreational facilities. This Project aims to develop the existing surface basin area that takes drainage from the nearby roadways including Caltrans Highway into a subsurface stormwater capture and infiltration system with park features on the surface. The City is committed to maximizing community benefits through the Project. Amenities are expected to include a nature-based playground, shade structure, outdoor fitness equipment, picnic areas, native plants and pollinator garden, restroom facility, irrigation system and walking path with solar lighting, recycled benches and tables, and open green space. The park will also include approximately 17 new large shade trees, native plants and shrubs, permeable walkways, and stormwater capture bioswales and an underground water infiltration system to recharge this region’s groundwater table. The conceptual layout of the Project is included as Figure 2-1.
The City is a participant in the Upper San Gabriel River (USGR) Watershed Management Group (WMG), which is composed of the County of Los Angeles (County), Los Angeles County Flood Control District (LACFCD), and the Cities of Baldwin Park, Covina, Glendora, Industry, La Puente, and West Covina. The USGR WMG developed the USGR Enhanced Watershed Management Program (EWMP) Plan, which identified projects to improve water quality. The Project may support the EWMP Plan’s stormwater planning goals including reusing stormwater, enhancing flood control, promoting water conservation efforts, improving water quality, and increasing water supplies.
The Project goals are summarized as follows:
Increase recreational park space
Promoting groundwater recharge
Enhance water quality
Maximize community benefits
Minimize disruption to residents and local businesses Incorporate community-based input
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 3 -
Figure 2-1 Project Concept
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 4 -
2.1 Project Location
The proposed Project will be located in the City of Baldwin Park, within Los Angeles County, California.
The City of Baldwin Park is situated in the central San Gabriel Valley region of Los Angeles County. The project site is at Roadside Park, located at 1081 Leorita Street, as depicted in Figure 2-2. Roadside Park will take the place of two empty lots at the intersection of Leorita Street and Dalewood Street, adjacent to the Kaiser Permanente Medical Center, next to the San Bernadino Freeway (Highway 10). The park’s location is also 0.25 miles from the route of the Baldwin Park Greenway, a 5-mile protected bike and pedestrian path that is currently under construction.
Figure 2-2 Project Location
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 5 -
3. Initial Study/Environmental Checklist
Environmental Checklist Form
1. Project Title: Roadside Park and Stormwater Capture Project
2. Lead Agency Name
and Address:
City of Baldwin Park
14403 E. Pacific Avenue, Baldwin Park, California 91706
3. Contact Person
and Phone
Number:
Manuel Carrillo Jr.
Director of Recreation & Community Services
(626) 813-5269
4. Project Location: Roadside Park, City of Baldwin Park, California
5. Project Sponsor’s
Name and
Address:
City of Baldwin Park
14403 E. Pacific Avenue, Baldwin Park, California 91706
6. General Plan
Designation:
Open Space
7. Zoning: Open Space
8. Description of
Project:
The City of Baldwin Park will develop a new 0.80-acre nature-based park at a blighted vacant lot adjacent to Kaiser Permanente Medical Center.
The new park, referred to as Roadside Park, is expected to include passive and active recreation features, including a nature-based playground, shade structure, outdoor fitness equipment, picnic areas, native plants and pollinator garden, restroom facility, irrigation system and walking path with solar lighting, recycled benches and tables, and open green space. The park will also include approximately 17 new large shade trees, native plants and shrubs, permeable walkways, and stormwater capture bioswales and an underground water infiltration system to recharge this region’s groundwater table.
9. Surrounding land
uses and setting:
General Commercial
10. Other public
agencies whose
approval is
required:
LACFCD
11. Have California
Native American
tribes traditionally
and culturally
affiliated with the
project area
requested
consultation
pursuant to Public
Resources Code
section 21080.3.1?
If so, has
consultation
begun?a
The City of Baldwin Park sent out notification letters to the Soboba Band of Luiseno Indians, Gabrieleno Band of Mission Indians-Kizh Nation, and Gabrieleno-Tongva Tribe, pursuant to Assembly Bill 52 and Public Resources Code Section 21080.3.1.
a. Conducting consultation early in the CEQA process allows tribal governments, lead agencies, and project proponents to discuss the level of environmental review, identify and address potential adverse impacts to tribal cultural resources, and reduce the
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 6 -
potential for delay and conflict in the environmental review process. (See Public Resources Code section 21083.3.2.) Information may also be available from the California Native American Heritage Commission’s Sacred Lands File per Public Resources Code section 5097.96 and the California Historical Resources Information System administered by the California Office of Historic Preservation. Please also note that Public Resources Code section 21082.3(c) contains provisions specific to confidentiality.
The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages.
Aesthetics
Agriculture and Forestry
Resources Air Quality
Biological Resources Cultural Resources Energy
Geology / Soils Greenhouse Gas Emissions
Hazards & Hazardous
Materials
Hydrology / Water Quality Land Use / Planning Mineral Resources Noise Population / Housing Public Services
Recreation Transportation Tribal Cultural Resources
Utilities/Service Systems Wildfire
Mandatory Findings of
Significance
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 7 -
On the basis of this initial evaluation:
I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.
I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.
I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required.
Signature Date
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 8 -
3.1 Aesthetics
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Have a substantial adverse effect on a scenic
vista? X
b) Substantially damage scenic resources, including,
but not limited to, trees, rock outcroppings, and
historic buildings within a state scenic highway?
X
c) In non-urbanized areas, substantially degrade
the existing visual character or quality public views
of the site and its surroundings? (Public views are
those that are experienced from a publicly
accessible vantage point). If the project is in an
urbanized area, would the project conflict with
applicable zoning and other regulations governing
scenic quality?
X
d) Create a new source of substantial light or glare
which would adversely affect day or nighttime views
in the area?
X
Discussion:
a) The City of Baldwin Park does not designate any scenic vistas according to the City’s General Plan.
The project site is designated as open space but is currently vacant and within an urbanized commercial area. Construction of the Project will involve temporary ground disturbance activities.
During construction, the presence of construction equipment and materials may be visible from public vantage points; however, these activities will not significantly impact any scenic views or vistas.
Once the construction is complete, the project site will have enhanced above-ground amenities and will not obstruct any existing views or vistas. Therefore, the Project is not anticipated to have a substantial adverse impact on scenic vistas, and no further impacts are expected.
b) The Project is not located within or adjacent to any designated scenic resources. According to the California Department of Transportation Scenic Highways Program Database, there are no designated state scenic highways located near the Project. Additionally, the City’s General Plan does not specify any scenic highway corridors. The proposed site does not contain any rock outcroppings or formations. Existing trees on the site may be removed, however, 17 new trees are proposed to be included in the park. As a result, there will be no significant impacts to trees, rock outcroppings, or state scenic highways. Therefore, no significant impacts to scenic resources are anticipated.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 9 -
c) The Project is located within an urbanized area. Construction activities associated with the Project will require the use of construction equipment and the storage of materials on-site, which will introduce temporary contrasting features into the visual landscape. These features may include demolition debris, excavated areas, stockpiled soils, and other materials generated and stored during construction. However, these visual disturbances will be temporary, and once construction is completed, the proposed infrastructure will enhance the aesthetic quality of the park facilities. As a result, impacts to the visual character of the site will be temporary and less than significant.
d) The project site is already situated within an urbanized area, predominantly surrounded by residential and commercial land uses. Existing sources of light, such as those from Highway 10 and the nearby parking lots, contribute to nighttime illumination. The Project will introduce new solar lighting along the proposed walking path, but this is minimal and considered less than significant. Therefore, adverse impacts to daytime or nighttime views are less than significant.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 10 -
3.2 Agriculture and Forestry Resources
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program (FMMP)
of the California Resources Agency, to non-
agricultural use?
X
b) Conflict with existing zoning for agricultural use,
or a Williamson Act contract? X
c) Conflict with existing zoning for, or cause
rezoning of, forest land (as defined in Public
Resources Code section 12220(g)), timberland (as
defined by Public Resources Code section 4526), or
timberland zoned Timberland Production (as
defined by Government Code section 51104(g))?
X
d) Result in the loss of forest land or conversion of
forest land to non-forest use? X
e) Involve other changes in the existing
environment which, due to their location or nature,
could result in conversion of Farmland, to non-
agricultural use or conversion of forest land to non-
forest use?
X
Discussion:
a) According to the State of California Department of Conservation FMMP, the project site is not located in an area designated as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance.
Therefore, there is no impact to farmland or agricultural resources.
b) The City of Baldwin Park is located within Los Angeles County, which is participating in the 2023 California Williamson Act. However, the project site is not zoned for agricultural use. Consequently, there is no anticipated impact from this designation.
c) The project location area has no forest trees or areas designated for timberland. The Project is located in an urban environment surrounded by areas of residential and commercial land use. The Project will not conflict with existing zoning of forest land, timberland, or timberland zoned Timberland Production. Therefore, there is no anticipated impact.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 11 -
d) As discussed above, the Project is not located in forest land, so there will be no loss or conversion of forest land. Therefore, there is no impact.
e) The project site is not located on land designated for agricultural use and will not result in the conversion of farmland to non-agricultural use or forest land to non-forest use. Therefore, no impacts are anticipated.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 12 -
3.3 Air Quality
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Conflict with or obstruct implementation of the
applicable air quality plan? X
b) Result in a cumulatively considerable net
increase of any criteria pollutant for which the
project region is non-attainment under an
applicable federal or state ambient air quality
standard?
X
c) Expose sensitive receptors to substantial
pollutant concentrations? X
d) Result in other emissions (such as those leading
to odors) adversely affecting a substantial number
of people?
X
Discussion:
a) The City of Baldwin Park is located within the South Coast Air Basin (SCAB), which is bound by the San Gabriel, San Bernardino, and San Jacinto Mountains to the north and east, and the Pacific Ocean to the south and west. The air quality in the SCAB is managed by the South Coast Air Quality Management District (SCAQMD). The SCAB has a history of recorded air quality violations and is an area where both state and federal ambient air quality standards are exceeded, and therefore, is subject to the 2022 Air Quality Management Plan (AQMP). The 2022 AQMP includes integrated strategies and control measures needed to meet National Ambient Air Quality Standards (NAAQS).
Construction will conform with the requirements of the 2022 AQMP and will use the strategies in the AQMP during all phases of construction. The Project will result in temporary impacts to air quality due to the construction activities, and will therefore have a less than significant impact with the 2022 AQMP.
b) The Project is located in the SCAB, which is a non-attainment area for respirable fine particulate matter (PM) 2.5 (PM
2.5), Lead, and Ozone. The SCAB is a designated attainment area for all other criteria pollutants. The SCAQMD has established Regional Significance Thresholds for each criteria pollutant. Potential air emissions were calculated using the CalEEMod, Version 2022.1.1.28, a model used to quantify air impacts from land use projects located throughout California. Table 3-1 shows the daily emissions rate for unmitigated construction during the summer, in comparison to the Regional Significance Thresholds.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 13 -
Table 3-1 Daily Emissions for Construction of the Project Pollutant NOx PM10 PM2.5 SOx CO
Maximum Emissions rate (lbs/day) 10.4 0.76a 0.44b 0.04c 15.9 Mass Daily Thresholds (lbs/day) 100 150 55 150 550
Exceed Threshold? No No No No No
a PM10 total modeled emissions
b PM2.5 total modeled emissions
c SO2 modeled emissions
The Project is not expected to result in a measurable long-term increase in air pollutant emissions.
After construction, the Project will have minimal vehicle trips to the sites for inspection and maintenance procedures. Therefore, impacts would be considered less than significant.
c) Certain residents, such as the very young, the elderly and those suffering from certain illnesses or disabilities, are particularly sensitive to air pollution and are considered sensitive receptors. The sensitive receptors of concern are Kaiser Permanente Medical Center, directly southeast at 1011 Baldwin Park Boulevard, Baldwin Park, CA 91706, Tracy Elementary School, 0.4 miles northeast at 13350 Tracy Street, Baldwin Park, CA 91706, De Anza Elementary School, 0.5 miles northwest at 12820 Bess Avenue, Baldwin Park, CA 91706, Torch Middle School, 0.6 miles southeast at 751 Vineland Avenue, Bassett, CA 91746, and the residential areas surrounding the Project site.
However, the proposed Project will not exceed the Regional Significance Threshold of criteria pollutants; therefore, the proposed Project will have a less than significant impact on nearby sensitive receptors with mitigation measure AIR-1.
d) Project construction equipment and activities, including diesel exhaust emissions, could generate odors. There may be situations where construction activity odors would be noticeable by persons working at or visiting nearby facilities, but these odors would not be unfamiliar or objectionable. In addition, these odors would be temporary and would dissipate rapidly from the source with an increase in distance. There are no long-term odors anticipated from the construction of the Project.
Because there may be short-term odors as a result from the temporary construction of the Project, impacts will be less than significant.
Mitigation Measures:
AIR-1 – Pursuant to Rule 403 of the SCAQMD, the following dust minimizing measures shall be implemented:
City of Baldwin Park and its designees shall comply with all applicable SCAQMD Rules and Regulations, including Rule 403 ensuring the cleanup of construction-related dirt on approach routes to the site. Rule 403 prohibits the release of fugitive dust emissions from any active operation, open storage pile or disturbed surface area visible beyond the property line of the emission source.
City of Baldwin Park and its designees shall comply with all SCAQMD established minimum requirements for construction activities to reduce fugitive dust and PM 10 emissions.
Adequate water techniques shall be employed to mitigate the impact of construction-related dust particulates. Portions of the site that are undergoing surface earth moving operations shall be
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 14 -
dewatered such that a crust will be formed on the ground surface, and then watered again at the end of each day. Site watering shall be performed as necessary to mitigate blowing dust. Grading operations shall be suspended during first stage ozone episodes or when winds exceed 25 mph. A high wind response plan shall be formulated for enhanced dust control if winds are forecast to exceed 25 mph in any upcoming 24-hour period. Any construction equipment using direct internal combustion engines shall use a diesel fuel with a maximum of 0.05 percent sulfur and four-degree retard. Construction operations affecting roadways within the project area including detour routes, shall be scheduled by implementing traffic hours and shall minimize obstruction of through traffic lanes.
The engines of idling trucks or heavy equipment shall be turned off if the expected duration of idling exceeds five minutes.
On-site heavy equipment used during grading and construction shall be equipped with diesel particulate filters unless it is demonstrated that such equipment is not available, or its use is not cost-competitive.
All haul trucks leaving or entering the site shall be covered or have at least two feet of freeboard. Any on-site stockpiles of debris, dirt or other dusty material shall be covered or watered twice daily.
Any site access points within 30 minutes of any visible dirt deposition on any public right-of-way shall be mechanically or manually swept.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 15 -
3.4 Biological Resources
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Have a substantial adverse effect, either directly
or through habitat modifications, on any species
identified as a candidate, sensitive, or special status species in local or regional plans, policies, or
regulations, or by the California Department of Fish
and Wildlife or U.S. Fish and Wildlife Service?
X
b) Have a substantial adverse effect on any riparian
habitat or other sensitive natural community
identified in local or regional plans, policies,
regulations or by the California Department of Fish
and Wildlife or US Fish and Wildlife Service?
X
c) Have a substantial adverse effect on state or
federally protected wetlands (including, but not
limited to, marsh, vernal pool, coastal, etc.) through
direct removal, filling, hydrological interruption, or
other means?
X
d) Interfere substantially with the movement of any
native resident or migratory fish or wildlife species
or with established native resident or migratory
wildlife corridors, or impede the use of native
wildlife nursery sites?
X
e) Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?
X
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state
habitat conservation plan?
X
Discussion:
a) Based on a report generated by the U.S. Fish and Wildlife Service (USFWS) Information for Planning and Conservation (IPaC), seven federally listed endangered species have a potential to be present in the area: Coastal California Gnatcatcher, Least Bell’s Vireo, Southwestern Willow Flycatcher, Southwestern Pond Turtle, Monarch Butterfly, Nevin’s Barberry, and Slender-horned Spineflower.
However, no critical habitat overlaps or is designated within the project area for the species above.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 16 -
The Project is located in a heavily urbanized area and is less than 100 feet away from San Bernardino Freeway (I-10), it is unlikely that suitable habitat exists for any of these species. The Project will implement various mitigation measures, including pre-construction species surveys and protective actions if special-status species are discovered during construction. Additionally, the Project will incorporate native vegetation, improving local habitat for surrounding species. With the inclusion of Mitigation Measures BIO-1 through BIO-3, the impact on sensitive, special-status, or listed species is expected to be less than significant.
b) According to the National Wetlands Inventory, as mapped by the USFWS, the Project is not located within riparian areas, and therefore, there will be no impact on riparian habitats or other sensitive natural communities. The surrounding areas have been urbanized and developed, so no significant impacts are anticipated.
c) Wetlands, as defined by the federal Clean Water Act, refer to areas that are flooded or saturated by surface water or groundwater at a frequency and duration sufficient to support vegetation adapted to life in saturated soils. These areas include swamps, marshes, streams, lakes, and bogs. There are no wetlands, vernal pools, or similar features within the proposed project site, but the project site is
0.25 miles north of Walnut Creek, a tributary of the San Gabriel River. Walnut Creek has freshwater emergent wetland, freshwater forested/shrub wetland, and riverine regions according to the National Wetlands Inventory mapper. Best Management Practices (BMPs) will be implemented throughout the construction phase to prevent erosion and control dust. During dry weather, flows are expected to be minimal and will be captured by the stormwater management system. During wet weather, the flows intercepted by the Project will not result in significant hydrological impacts. Therefore, with the implementation of Mitigation Measure BIO-3, the project’s impacts on wetlands will be less than significant.
d) The proposed Project is situated in an urbanized area, specifically in an established but vacant park.
It is anticipated that the Project will have minimal impact on local wildlife movement or nurseries.
While the site includes several trees, the urban environment suggests they are unlikely to provide suitable habitat or nesting sites for migratory birds, as defined by the federal Migratory Bird Treaty Act and the California Department of Fish and Wildlife (CDFW) Code, Section 3513 et seq. However, while the likelihood of nesting is low, it is still possible for birds to nest in the area. Project activities could result in the mortality or injury of nestlings, as well as the temporary or long-term loss of suitable foraging habitat.
Given the heavily urbanized nature of the area and the presence of ornamental trees, there is potential for these trees to provide habitat for nesting birds. Construction activities may disturb nesting habitats; therefore, with the implementation of Mitigation Measures BIO-1 through BIO-3, the project’s impacts on nesting birds will be less than significant.
e) The proposed Project will comply with the City’s Municipal Code Chapter 153.165, Tree Preservation and Protection. Therefore, no impact on existing tree preservation policies or ordinance is anticipated.
f) The Project will not conflict with any adopted conservation plan. The Project aligns with the City’s General Plan Health and Sustainability Element goals, including Goals HS-9, to protect and enhance natural features. Therefore, no conflicts with conservation plans are anticipated.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 17 -
Mitigation Measures:
BIO-1 – Prior to ground-disturbing activities in areas that could support sensitive biological resources, a habitat assessment shall be conducted by a qualified biologist to determine the potential for special- status wildlife species to occur within affected areas, including areas directly or indirectly impacted by construction or operation of the BMPs. If a special-status wildlife species is found, pre-construction surveys of proposed work zones should be conducted 14 days prior to construction. Areas, including construction areas, staging areas, and right-of-ways, should be staked, flagged, fenced, or otherwise clearly delineated to restrict the limits of construction to the minimum necessary near areas that may support special-status wildlife species with special-status wildlife species; if avoidance is not possible, the City of Baldwin Park should consult with the appropriate regulating agency (USACE/USFWS/CDFW) to determine a strategy for compliance with the Endangered Species Act, California Fish and Wildlife Code, or other regulations supporting special-status species. The City of Baldwin Park will work together with those regulating agencies to determine appropriate impact minimization measures and compensation for any permanent impacts due to the Project. If no breeding and nesting birds and/or raptors are found, then construction may proceed as scheduled with no additional monitoring or measured required.
BIO-2 – To protect nesting birds that may occur on site or adjacent to the Project boundary, no construction shall occur from February 1 through September 15, as early as January 1 for some raptors, unless a qualified biologist completes a survey for nesting bird activity within a 500-foot radius of the construction site. The nesting bird surveys shall be conducted at appropriate nesting times and concentrate on potential roosting or perch sites. The City of Baldwin Park should require surveys be conducted by a qualified biologist no more than 7 days prior to the beginning of any Project-related activity likely to impact raptors and migratory songbirds, for the entire project site. If Project activities are delayed or suspended for more than 7 days during the breeding season, the surveys shall be repeated. If nesting raptors and migratory songbirds are identified, the following minimum no- disturbance buffers shall be implemented: 300 feet around active passerine (perching birds and songbirds) nests, 500 feet around active non-listed raptor nests and 0.5 mile around active listed bird nests. These buffers shall be maintained until the breeding season has ended or until a qualified biologist has determined that the birds have fledged and are no longer reliant upon the nest or parental care for survival. Any sensitive and special status species data documented by the Project shall be submitted to the California Natural Diversity Database with all applicable data fields filled out. The City of Baldwin Park and/or a designee will notify the CDFW once submitted.
BIO-3 – The Project shall implement BMPs to prevent erosion and the discharge of sediment and pollutants into drainages during Project activities. BMPs shall be monitored and repaired, if necessary, to ensure maximum erosion, sediment, and pollution control. The Project proponent shall prohibit the use of erosion control materials potentially harmful to fish and wildlife species, such as mono-filament netting (erosion control matting) or similar material. All fiber rolls, straw wattles, and/or hay bales utilized within and adjacent to the project site shall be free of nonnative plant materials. Fiber rolls or erosion control mesh shall be made of loose-weave mesh that is not fused at the intersections of the weave, such as jute, or coconut (coir) fiber, or other products without welded weaves.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 18 -
3.5 Cultural Resources
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Cause a substantial adverse change in the
significance of a historical resource pursuant to §
15064.5?
X
b) Cause a substantial adverse change in the
significance of an archaeological resource pursuant
to § 15064.5?
X
c) Disturb any human remains, including those
interred outside of dedicated cemeteries? X
Discussion:
a) A Cultural Resource Assessment was conducted by Dudek in May 2025. A records search of the surrounding areas via the South Central Coastal Information Center (SCCIC) located on the campus of the California State University, Fullerton included a one-mile buffer of the project location. Data from the SCCIC indicated that there have been 36 previous cultural resources studies conducted within a one-mile radius, with four studies overlapping with the project site. The SCCIC records search did not identify any cultural resources within the Project APE, though it did identify 30 previously recorded cultural resources within a one-mile radius of the Project APE. Of the 30 previously recorded resources, 28 are historic-era built environment resources, one is a historic-era trash scatter, and one is a prehistoric resource containing midden and burials.
Additional research consisting of a review of historic-period maps and aerial photographs shows that the project site was in the vicinity of the historic courses of the Walnut Creek Wash and the San Gabriel River. Additionally, the project site has been subjected to minimal structural development, but the surface area has been previously disturbed by roads, paths, previous and current development, and landscaping.
An NAHC search of the Sacred Lands File (SLF) for the project site and one-mile radius was completed with negative results. Due to the discussion above, impacts to historical resources are anticipated to be less than significant.
b) See discussion above in part a). However, if during construction any archaeological remains are found, all construction will cease until qualified personnel can identify the remains and mitigate the findings. Impacts are anticipated to be less than significant with incorporating mitigation measures CUL-1, through CUL-4.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 19 -
c) No formal cemeteries were found on or near the project site. Most Native American human remains are found in association with prehistoric archaeological sites. Mitigation measure CUL-1, through and CUL-3 will be incorporated to reduce potential impacts to less than significant.
Mitigation Measures:
CUL-1 – Prior to the commencement of grading or excavation, all workers and supervisors will receive Worker Environmental Awareness Program (WEAP) training from a qualified archaeologist regarding the potential for sensitive archaeological and paleontological resources to be unearthed during grading activities. The training shall educate and direct the workers to report any unusual specimens of bone, stone, ceramics or other archaeological artifacts or features observed during excavation, grading, and/or other construction activities to their foremen and to cease grading activities in the immediate vicinity of the discovery until a qualified archaeologist or Native American cultural monitor is notified of the discovery at the project site and can assess their significance. Upon completion of the WEAP, workers shall sign a form stating that they attended the program, understand all protection measures, and shall abide by all the rules of the WEAP. If new construction personnel are added to the Project later, the construction foreman shall ensure that new personnel receive training before they start working. The WEAP shall be implemented throughout the duration of project construction. A record of all trained personnel shall be kept at the project field construction office and shall be made available to any resource agency personnel.
CUL-2 – If previously unidentified cultural resources and/or tribal cultural resources are unearthed during ground activity, all work shall immediately be suspended within 100 feet of the discovery and the City shall be immediately notified. A qualified archaeologist and a Native American monitor shall assess the significance of the find and determine if it is a California Register of Historic Resource (CRHR)-eligible archaeological resource and/or tribal cultural resource. If the qualified archaeologist determines that adverse impacts to tribal cultural resources or significant archaeological resources could occur during the Project, then the resources shall be avoided from direct Project impacts by Project redesign, if feasible.
If the resource cannot be avoided, then an archaeological treatment plan shall be developed and implemented.
CUL-3 – In compliance with Section 5097.98 of the Public Resources Code and Section 7050.5 of the California Health and Safety Code, if human remains are encountered, all ground disturbing activities shall be immediately suspended within 100 feet of the discovery, and the County Coroner should be notified immediately. If the Coroner determines the remains are Native American in origin, they must notify the Native American Heritage Commission within 24 hours of such identification so that the Native American Heritage Commission can contact the Most Likely Descendant (MLD). The MLD shall be provided access to the discovery and will provide recommendations for treatment of the remains within 48 hours of accessing the discovery site. The MLD recommendations may include scientific removal and nondestructive analysis of human remains and items associated with Native American burials, preservation of Native American human remains and associated items in place, relinquishment of Native American human remains and associated items to the descendants for treatment, or any other culturally appropriate treatment. Disposition of human remains and any associated grave goods, if encountered, shall be treated in accordance with procedures and requirements set forth in Sections 5097.94 and 5097.98 of the Public Resources Code; Section 7050.5 of the California Health and Safety Code and CEQA Guidelines Section 15064.5.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 20 -
CUL-4 – If it can be demonstrated that a project will cause damage to a unique archaeological resource, the lead agency may require reasonable efforts to be made to permit any or all of these resources to be preserved in place or left in an undisturbed state. Preservation in place is the preferred manner of mitigating impacts to archaeological sites. Preservation in place maintains the relationship between artifacts and the archaeological context. Preservation may also avoid conflict with religious or cultural values of groups associated with the site. Examples of that treatment, in no order of preference, may include, but are not limited to, any of the following: planning construction to avoid archaeological sites, deeding archaeological sites into permanent conservation easements, capping or covering archaeological sites with a layer of soil before building on the sites, and planning parks, greenspace, or other open space to incorporate archaeological sites.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 21 -
3.6 Energy
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Result in potentially significant environmental
impact due to wasteful, inefficient, or unnecessary
consumption of energy resources, during project
construction or operation?
X
b) Conflict with or obstruct a state or local plan for
renewable energy or energy efficiency? X
Discussion:
a) The proposed sites do not require or result in potentially significant environmental impacts due to wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation. Minimal energy will be required during operation of the park for solar lighting to illuminate pedestrian pathways during nighttime. Therefore, there is no anticipated impact.
b) The proposed sites will not obstruct a state or local plan for renewable energy or energy efficiency.
Therefore, there is no anticipated impact.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 22 -
3.7 Geology and Soils
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Directly or indirectly cause potential substantial
adverse effects, including the risk of loss, injury, or death involving:
i) Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the State
Geologist for the area or based on other substantial
evidence of a known fault? Refer to Division of
Mines and Geology Special Publication 42.
X
ii) Strong seismic ground shaking? X
iii) Seismic-related ground failure, including
liquefaction? X
iv) Landslides? X
b) Result in substantial soil erosion or the loss of
topsoil? X
c) Be located on a geologic unit or soil that is
unstable, or that would become unstable as a result
of the project, and potentially result in on- or off-
site landslide, lateral spreading, subsidence,
liquefaction or collapse?
X
d) Be located on expansive soil, as defined in Table
18-1-B of the Uniform Building Code (1994),
creating substantial direct or indirect risks to life or property?
X
e) Have soils incapable of adequately supporting
the use of septic tanks or alternative waste water
disposal systems where sewers are not available for
the disposal of waste water?
X
f) Directly or indirectly destroy a unique
paleontological resource or site or unique geologic
feature?
X
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 23 -
Discussion:
a)
i) The project site is located in southern California, a seismically active region. Although the Project is not within a known earthquake fault zone as delineated on an Alquist-Priolo Earthquake Fault Zoning Map, the City’s General Plan indicates regional faults within a 50-mile radius of the city that have the potential to cause damage in the City. The General Plan also describes how although unlikely, failure of the Santa Fe Dam due to seismic activity has the potential to impact the City. Therefore, the potential impact from fault rupture is considered less than significant.
ii) The Project site is located in southern California, a seismically active area. However, the likelihood of hazards related to strong seismic ground shaking, such as ground surface rupture, is low. The Project will be designed and constructed in compliance with federal, state, and municipal building codes governing seismic safety. Thus, the impact from strong seismic ground shaking is considered less than significant.
iii) Liquefaction refers to the loss of soil strength in saturated, coarse-grained soils during seismic activity. Liquefaction susceptibility is influenced by soil properties such as grain size, relative density, fines content, and the presence of clay-size fractions. The California Geological Survey indicates that the Project is located within a liquefaction zone. However, the project design will adhere to the recommendations in the project’s geotechnical report to minimize and mitigate potential adverse effects from seismic activity. Therefore, the impact from liquefaction is considered less than significant.
iv) According to the California Geological Survey, the project site is not located in an area identified as a landslide hazard zone. As such, all structures in the project’s design will be protected from landslides and other ground movements. No impact from landslides is anticipated.
b) Construction of the Project will require minimal vegetation removal and involve various earthwork activities, including grading, excavation, and fill, which could result in localized soil erosion. However, standard erosion control measures will be implemented during construction, including revegetation or stabilization of disturbed areas following construction. Therefore, impacts related to erosion are considered less than significant.
c) As noted in Sections 3.7(a) and (b), the Project is not in a fault or landslide zone but is within a liquefaction zone. The Project will incorporate construction practices to minimize and mitigate potential adverse impacts related to soil stability. Therefore, the potential hazards associated with soil stability are considered less than significant.
d) Expansive soils, which expand when wet and shrink when dry, can cause structures to move unevenly, leading to cracking. According to the United States Department of Agriculture (USDA) Web Soil Survey, the entire project site consists of sandy loam, clay loam, and loamy sand. These soil types are generally not expansive. Sand particles provide good drainage and exhibits minimal shrink- swell behavior. Therefore, no impacts are anticipated.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 24 -
e) The Project will involve the construction of a restroom facility, but will not require the installation of septic tanks or alternative wastewater disposal systems. Therefore, no impact is anticipated.
f) Since the Project includes earthmoving activities and is expected to extend into these sensitive sediments, excavation, and grading could potentially disturb paleontological resources. The Project will involve significant ground disturbance, including excavation and grading of subsurface materials.
Based on the soil conditions and not anticipating any potential paleontological resources, mitigation measures CUL-1 through CUL-4 will be incorporated to reduced impacts to less than significant.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 25 -
3.8 Greenhouse Gas Emissions
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Generate greenhouse gas emissions, either
directly or indirectly, that may have a significant
impact on the environment?
X
b) Conflict with an applicable plan, policy or
regulation adopted for the purpose of reducing the
emissions of greenhouse gases?
X
Discussion:
a) As discussed in the Air Quality impact analysis, the Greenhouse Gas (GHG) emissions generated by the proposed Project would not exceed the SCAQMD threshold of 3,000 metric tons (MT) CO 2e per
year. The construction phase’s GHG emissions were calculated using the CalEEMod, Version 2022.1.1.22. Table 3-2 shows the unmitigated, yearly emissions rate in comparison to the Regional Significance Threshold. Because GHG missions will not exceed the threshold, the Project would have a less than significant impact on GHG.
Table 3-2 Greenhouse Gas Emissions for Project
Pollutant CO2
Maximum Construction Emissions rate (MT/year) 105
SCAQMD Threshold (MT/year) 3,000
Exceed Threshold? No
b) The Project would not conflict with the State plan and policy AB 32 (California Global Warming Solutions Act of 2006) quantitative goal of AB 32 is to reduce GHG emissions to 1990 levels by 2020.
Because the Project does not conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emission of GHG, there would be no anticipated impact.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 26 -
3.9 Hazards and Hazardous Materials
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
X
b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset
and accident conditions involving the release of
hazardous materials into the environment?
X
c) Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
within one-quarter mile of an existing or proposed
school?
X
d) Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a result,
would it create a significant hazard to the public or
the environment?
X
e) For a project located within an airport land use
plan or, where such a plan has not been adopted,
within two miles of a public airport or public use
airport, would the project result in a safety hazard
or excessive noise f or people residing or working in
the project area?
X
f) Impair implementation of or physically interfere
with an adopted emergency response plan or
emergency evacuation plan?
X
g) Expose people or structures, either directly or
indirectly, t o a significant risk of loss, injury or
death involving wildland fires?
X
Discussion:
a) Construction activities required for this Project will potentially involve excavation, grading, drilling, and other ground-disturbing activities. Anticipated construction activities may require the transport, storage, use, and disposal of small amounts of hazardous materials that may include gasoline, diesel, hydraulic fluids, oils and lubricants and other similarly related materials for the project site, however,
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 27 -
there will be no routine transport, use, or disposal of hazardous materials involved in the operation of the Project. Therefore, the impacts would be less than significant.
b) As described above, there is limited potential for hazardous materials to cause a significant hazard through the routine transport, use, or disposal of hazardous materials. However, such materials will be used during construction of the Project. Handling and disposal of materials during construction would be conducted in compliance with existing federal, state, and county regulations, and would not be expected to result in the accidental release of hazardous materials into the environment.
Therefore, impacts would be less than significant.
c) There are no schools within 0.25 miles of the project site. As discussed earlier, handling and disposal of hazardous materials is anticipated to be minimal, and would be conducted in compliance with existing federal, state, and county regulations. GHG emissions and criteria air pollutants will be emitted, but not in a significant amount, as none of the GHG emissions exceed SCAQMD thresholds.
Therefore, there are no anticipated impacts.
d) There are no Federal Superfund or other cleanup sites within the proposed project site. According to the California Department of Toxic Substances Control, the nearest Federal Superfund site is San Gabriel Valley Superfund Site Area 2, located approximately 2 miles northeast of the project site, covering 10 square miles and includes portions of the cities of Azusa, Irwindale, Baldwin Park and West Covina. The cleanup site is not near the vicinity of the project site, so no impacts are anticipated.
e) The nearest airport is San Gabriel Valley Airport, located approximately 3 miles northwest of the project site. Because the airport is not within 2 miles of the project site, there are no anticipated impacts.
f) The Project will not interfere with any emergency response or evacuation plans. The Project site is near Highway 10, which is designated as a freeway disaster route by the City, but the construction of the Project is not anticipated to affect the highway. Additionally, the Project will not increase the population in the area or the demand for emergency access. Therefore, no impacts are anticipated.
g) According to the Cal OES MyHazards Tool, the City of Baldwin Park is not designated as a Fire Hazard Severity Zone. The City is situated in a highly urbanized area, which reduces the likelihood of exposing people or structures to significant risks from wildland fires. Therefore, no impacts are anticipated.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 28 -
3.10 Hydrology and Water Quality
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Violate any water quality standards or waste
discharge requirements or otherwise substantially
degrade surface or ground water quality?
X
b) Substantially decrease groundwater supplies or
interfere substantially with groundwater recharge
such that the project may impede sustainable
groundwater management of the basin?
X
c) Substantially alter the existing drainage pattern
of the site or area, including through the alteration
of the course of a stream or river o r through the
addition of impervious surfaces, in a manner which
would:
i) result in substantial erosion or siltation on- or off- site; X
ii) substantially increase the rate or amount of
surface runoff in a manner which would result in
flooding on- or offsite;
X
iii) create or contribute runoff water which would
exceed the capacity of existing or planned
stormwater drainage systems or provide substantial
additional sources of polluted runoff; or
X
iv) impede or redirect flood flows? X
d) In flood hazard, tsunami, or seiche zones, risk
release of pollutants due to project inundation? X
e) Conflict with or obstruct implementation of a
water quality control plan or sustainable
groundwater management plan?
X
Discussion:
a) The proposed Project would not significantly violate water quality standards, waste discharge requirements, or surface or ground water quality because project construction would comply with regulations instated by the Federal Clean Water Act, Los Angeles Regional Water Quality Control Board (LARWQCB), Los Angeles County, City of Baldwin Park, and other water quality control
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 29 -
regulations. BMPs will be implemented with respect to machinery and other contaminants. During construction, silt fencing or other sediment control BMPs will be placed around the perimeter of the construction site to prevent sediment from construction related activities from leaving the Project site. Gravel bags, plastic covers, erosion control blankets, and/or other erosion control BMPs will be implemented to be consistent with the Project’s erosion control plan. In the event of a hazardous materials spill, it will be immediately reported to the appropriate public agencies, including the City, the U.S. Army Corps of Engineers (USACE), LARWQCB, and CDFW. Therefore, impacts are anticipated to be less than significant.
b) Groundwater supplies will not be affected since the project does not include the installation of any groundwater wells and does not have additional demand for groundwater. The Project will capture and infiltrate dry- and wet-weather runoff and will replenish groundwater thereby providing a beneficial impact. Therefore, there are no anticipated impacts.
c) The project site is an existing surface drainage basin that takes runoff from nearby roadways and Caltrans Highway. The project would incorporate the existing surface basin into a subsurface basin which will receive existing runoff and infiltrate the runoff to recharge groundwater supplies.
i. The Project is located in an area that is urbanized, developed and mostly impervious.
The Project will not result in substantial erosion or siltation on- or off-site as it will not alter the existing drainage patterns of the site. As noted in Section 3.10(a), construction BMPs will be implemented to prevent erosion or siltation during construction. Therefore, impacts are anticipated to be less than significant.
ii. The Project will not substantially increase surface runoff or significantly raise the imperviousness of the area, which could lead to flooding on or offsite. The park design features bioswale drains that will capture surface runoff to the stormwater capture system, reducing surface runoff. Therefore, there is no anticipated impact.
iii. The bioswale system will not create or contribute to runoff water or additional sources of polluted runoff or exceed the capacity of the drainage system. Therefore, there is no anticipated impact.
iv. The Project is not expected to impede or redirect flood flows as flows are not being diverted. Therefore, there are no anticipated impacts on flood flow patterns.
d) The proposed Project is not located within a flood hazard zone, tsunami, or seiche zone. According to the Federal Emergency Management Agency (FEMA), the project area is situated in Zone X, a low- risk area for flooding and is outside the 0.2% annual chance flood area. The proposed Project is approximately 23 miles northeast of the Pacific Ocean and is situated 315 feet above sea level.
Therefore, there are no anticipated impacts.
e) The Project will not conflict with the Los Angeles Region Basin Plan for the Coastal Watersheds of Los Angeles. All new developments are required to implement site design measures and BMPs to protect water quality and maintain natural drainage systems. Therefore, no impacts to water quality or drainage are anticipated.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 30 -
3.11 Land Use and Planning
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Physically divide an established community? X
b) Cause a significant environmental impact due to
a conflict with any land use plan, policy, or
regulation adopted for the purpose of avoiding or
mitigating an environmental effect?
X
Discussion:
a) The Project is located within the City of Baldwin Park and must adhere to the City’s adopted plans, policies, and regulations. The Project is designed to enhance community connectivity by incorporating active and passive recreational features. These facilities are not expected to physically divide or disrupt the surrounding community. Consequently, no impact is anticipated.
b) The project site is currently not designated as a specific zone, but the area is recognized as Roadside Park in the City’s General Plan, with limited use due to its current vacancy. The area is surrounded by commercial and residential land. The implementation of the Project will not conflict with any applicable land use plans, policies, or regulations intended to prevent or mitigate environmental impacts. The Project will further the City’s environmental efforts. As a result, no significant impact is anticipated.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 31 -
3.12 Mineral Resources
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Result in the loss of availability of a known
mineral resource that would be of value to the
region and the residents of the state?
X
b) Result in the loss of availability of a locally-
important mineral resource recovery site delineated
on a local general plan, specific plan or other land
use plan?
X
Discussion:
a) The Surface Mining and Reclamation Act of 1975 (SMARA) mandates the classification of land into Mineral Resource Zones (MRZs) based on the known or inferred mineral potential of the area. The MRZ categories are as follows:
MRZ-1: Areas where adequate information indicates that no significant mineral deposits are present or where it is judged that little likelihood exists for their presence. MRZ-2: Areas where adequate information indicates significant mineral deposits are present, or where it is judged that a high likelihood exists for their presence. MRZ-3: Areas containing mineral deposits the significance of which cannot be evaluated from available data.
MRZ-4: Areas where available information is inadequate for assignment to any other MRZ
The entirety of the City is classified by the California Geological Survey as MRZ-2, indicating an area where adequate information indicates significant mineral deposits are present. The City’s General Plan describes that the City is almost entirely built out, so areas containing significant resources are developed and therefore incompatible with mineral extraction and surface mining activities. Therefore, no impact is anticipated.
b) As noted above, mineral resources within the Project site and the City are inaccessible.
Consequently, the Project will not result in the loss of significant mineral resource recovery sites, and therefore, no impact is anticipated.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 32 -
3.13 Noise
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Generation of a substantial temporary or
permanent increase in ambient noise levels in the
vicinity of the project in excess of standards
established in the local general plan or noise
ordinance, or applicable standards of other
agencies?
X
b) Generation of excessive groundborne vibration or
groundborne noise levels? X
c) For a project located within the vicinity of a
private airstrip or an airport land use plan or, where
such a plan has not been adopted, within two miles
of a public airport or public use airport, would the
project expose people residing or working in the
project area to excessive noise levels?
X
Discussion:
a) The Project is primarily surrounded by residential and commercial zoned properties.
Because implementation of the Project may result in the generation of construction noise within the areas surrounding the Project during construction and project operations, a Noise Assessment was performed on June 27, 2025. To identify baseline noise conditions, short-term ambient noise level measurements at the Project and at nearby representative sensitive receptors were recorded utilizing sound level meters, as shown in Figure 3-1. The ambient noise level measurements were taken during day-time hours, or when construction would typically occur. Table 3-3 shows the results of the noise assessment, identifying minimum, average, and maximum A-weighted decibels (dBA) at nearby sensitive and residential land uses.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 33 -
Table 3-3 Noise Assessment Results
Number Location Description Minimum
(dBA)
Average
(dBA)
Maximum
(dBA)
1 Bess Avenue and Leorita Street 53 62 78
2 Leorita Street and Judith Street 41 52 87
3 Amar Road 42 53 68
4 Baldwin Park Boulevard and Bess
Avenue 52 65 87
5 Kaiser Permanente Baldwin Park 45 54 67
6 Dalewood Street 65 75 85
7 Parkwood Place 22 50 65
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 34 -
Figure 3-1 Noise Measurement Locations
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 35 -
Construction will take place between the hours of 8:00 AM until 5:00 PM Monday through Friday. The Baldwin Park Municipal code has exemptions for Noise listed in Chapter 130.37, which includes construction. Construction hours are limited to between 7:00 am and 7:00 pm. The City’s Municipal Code also states that noise levels must meet the criteria based on land use, as depicted in Table 3-4.
Table 3-4 City of Baldwin Park Land Use Guidelines for Exterior Noise Noise Zone
Allowable Noise Level (dBA)
Day
(7:00 am - 10:00 pm)
Night
(10:00 pm - 7:00 am)
Single-Family Residential 55 45
High Density Residential, Residential Garden 60 55
Commercial 65 60
Industrial 70 70
As shown in Table 3-5, the Federal Highway Administration (FHWA) identified predicted noise limits at a reference distance of 50 feet. By utilizing these values, noise levels at nearby sensitive receptors can be calculated and predicted.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 36 -
Table 3-5 Construction Equipment Noise Emission Levels Equipment Description Lmax Noise Limit at 50 feet., dB
Slow
Is Equipment an Impact
Device?
All other equipment > 5HP 85 No
Backhoe 78 No
Compactor (ground) 83 No
Compressor (air) 78 No
Concrete Mixer Truck 79 No
Concrete Saw 90 No
Crane 81 No
Dozer 82 No
Dump Truck 76 No
Excavator 81 No
Flat Bed truck 74 No
Front End Loader 79 No
Generator 81 No
Impact/Vibratory Pile Driver 101 Yes
Jackhammer 89 Yes
Mounted Impact Hammer 90 Yes
Pavement Scarifier 85 No
Pumps 81 No
Roller 80 No
Sand Blasting (single nozzle) 96 No
Slurry Trenching Machine 80 No
Vacuum Street Sweeper 82 No
Welder / Torch 74 No
Construction activities for this Project will comply with the City’s Noise Ordinance and meet all noise level requirements. The nearest sensitive receptors are the residential homes near the Project. The Project will potentially involve excavation, grading, drilling, trenching, pile driving, and other ground disturbing activities. Noise generated from construction activities would be temporary. During construction of the Project, the contractor will be required to use construction muffler devices, sound blankets, or other means to reduce noise levels to ambient levels. No long-term noise impacts are anticipated from the Project since there are no components as a part of the project that would produce noise.
Therefore, with incorporation of mitigation measures NOISE-1 through NOISE-3, impacts by noise from construction would be less than significant. Excessive noise levels will no longer occur from the Project once construction is complete.
b) Construction of the Project will generate some groundborne vibrations as part of the construction activities. The Project is expected to utilize equipment that may typically produce higher vibration levels, such as pile drivers and bulldozers. However, with the implementation of mitigation measures
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 37 -
NOISE-1 through NOISE-3, the impacts from groundborne vibrations are anticipated to be less than significant. Once construction is completed, all groundborne vibrations will cease.
c) The Project is not located within an airport land use designation and is situated more than two miles from San Gabriel Valley Airport. As a result, the Project will not expose people residing or working in the area to excessive noise levels associated with airport operations. Therefore, there is no anticipated impact.
Mitigation Measures:
NOISE-1 – The City of Baldwin Park and their designees shall implement the following measures during construction as needed:
Include design measures necessary to reduce the construction noise levels where feasible. These measures may include noise barriers, curtains, or shields. Place noise-generating construction activities (e.g., operation of compressors and generators, cement mixing, general truck idling) as far as possible from the nearest noise-sensitive land uses. Locate stationary construction noise sources as far from adjacent noise-sensitive receptors as possible.
Identify a liaison for off-site sensitive receptors, such as residents and property owners, to contact with concerns regarding construction noise and vibration. The liaison’s telephone number(s) shall be prominently displayed at construction locations. Notify, in writing, all landowners, occupants of properties adjacent to the construction area, and nearby sensitive receptors of the anticipated construction schedule at least 2 weeks prior to groundbreaking.
Prepare visible signs indicating “Noise Control Zone.” Use noise-control devices that meet original specifications and performance. To the extent practical, use electrically-powered equipment. Implement temporary noise barriers and sound-control curtains where project activity is unavoidably close to noise-sensitive receivers. In particular, noise barriers of 8 feet and 12 feet tall should be established around work sites to remove noise impacts from the different construction operation areas. The construction contractor should regularly evaluate the noise level at nearby sensitive receptors to ensure noise levels are not in exceedance. If so, the following noise barrier measures should also be incorporated:
Break line of sight from noise source to receiver
Use a frame to secure an appropriate acoustic blanket or paneling Use a solid material with a minimum surface density of 3 lb/ft 2 or mass-loaded acoustic
blankets with at least STC 25
Overlap or seal any gaps in the barriers
Designate haul routes to be used based on the least overall noise impact route, with heavily- loaded trucks away from residential streets, if possible. Identify haul routes streets with the fewest noise sensitive receivers if no alternatives are available.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 38 -
Place earth-moving equipment, fixed noise-generating equipment, stockpiles, staging areas, and other noise-producing operations as far as practicable from noise-sensitive receivers. Eliminate the use of horns, whistles, alarms, and bells. Phase demolition, earth moving, and ground impacting operations so they do not occur in the same time period.
In the case of nighttime construction, the contractor shall comply with the provisions of the nighttime noise variance issued by the City.
Conduct periodic noise measurements in accordance with an approved noise monitoring plan, specifying monitoring locations, equipment, procedures, and schedule of measurements and reporting methods to be used.
NOISE-2 – All construction activities that employ mechanized stationary equipment that generate noise levels shall comply with the applicable noise standards established by the City of Baldwin Park. The equipment shall be designed with noise-attenuating features (e.g., enclosures) and/or located at areas (e.g., belowground) where nearby noise-sensitive land uses would not be exposed to a perceptible noise increase in their noise environment.
NOISE-3 – To prevent impacts from vibrations, large vibration producing equipment should be placed as far as is feasible from sensitive receptors. Furthermore, the City of Baldwin Park and their designees should implement the following measures as needed:
Pre-construction Survey - A before and after survey should include inspecting building foundations and taking photographs (or installing crack monitors) of pre-existing conditions, cracks, or other flaws. The survey can be limited to buildings closest to the pile driving activities, except for the case of unusually fragile or historic structures that are located within approximately 200 feet of construction.
Sonic Pile Driving - At the upper range reference vibration for the sonic/vibratory pile driver, the risk for damage to nearby buildings begins when the equipment is 32 feet or closer to the structure. The nearest piling is expected to be 20 feet from the closest structure, so vibration limit exceedances would remain with use of a vibratory pile driver. Drilled Piles - Noise emission levels from bored/drilled pilling methods are approximately 15 dB lower and peak particle velocity (PPV) levels may be more than 15 times lower than those due to traditional impact piling. The use of these methods will eliminate the vibration impacts of all receivers. These methods will also substantially reduce the noise impacts and in most cases they will also be eliminated, with the use of a suitable noise barrier. Hammer Energy - A recommended way to reduce PPV is to lower the hammer energy since there is a direct relationship between hammer energy and the resultant ground vibration. Ground PPV generally follows a square root relationship with hammer energy (i.e. PPV ~ √Hammer Energy).
The degree of hammer energy reduction must be balanced against the likelihood/severity of expected exceedances, increase in total driving time, and ability to drive to required friction tolerances.
Vibration Monitoring - It is recommended that vibration monitoring be conducted at any building where equipment is operating closer than the limits noted in Table 3-6.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 39 -
Table 3-6 Construction Equipment Vibration Reference Levels Equipment Description Minimum Separation Distance
Pile Driver (impact) 52 feet
Pile Driver (Vibratory) 32 feet
Vibratory Roller 14 feet
Compactor (Ground) 13 feet
Large Bulldozer 8 feet
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 40 -
3.14 Population and Housing
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Induce substantial unplanned population growth
in an area, either directly (for example, by
proposing new homes and businesses) or indirectly
(for example, through extension of roads or other
infrastructure)?
X
b) Displace substantial numbers of existing people
or ho using, necessitating the construction of
replacement housing elsewhere?
X
Discussion:
a) The Project will not induce substantial unplanned population growth, either directly or indirectly. Its primary objective is to provide water quality improvements and enhance open space areas, not to develop new homes, businesses, or infrastructure that would attract population growth. Since the Project does not involve the construction of additional housing or commercial developments, nor does it extend roads or infrastructure in a way that would support such growth, population increase is anticipated, and no related impacts are expected.
b) The Project will not affect any residential areas, housing units, or other buildings, and there are no plans to displace any individuals or families. As such, no displacement of people is anticipated, and the construction of replacement housing elsewhere is not necessary. Therefore, no impacts related to displacement are anticipated.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 41 -
3.15 Public Services
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Result in substantial adverse physical impacts
associated with the provision of new or physically
altered governmental facilities, need for new or
physically altered governmental facilities, the
construction of which could cause significant
environmental impacts, in order to maintain
acceptable service ratios, response times or other
performance objectives for any of the public
services:
i. Fire protection? X
ii. Police protection? X
iii. Schools? X
iv. Parks? X
v. Other public facilities? X
Discussion:
a)
i. The nearest fire stations are Los Angeles County Fire Department Station 87, approximately
1.4 miles southwest of the Project at 140 S. 2
nd Avenue, Bassett, CA 91746, and Los Angeles
County Fire Department Fire Station 168, approximately 1.7 miles west of the Project at 3207 Cogswell Road, El Monte, CA 91732. If at any point during construction it is needed to close lanes or affect the flow of traffic, emergency services will be notified 10 days before construction. The construction of the Project will improve open space, and as a result, could potentially require emergency services should a fire or other significant emergency occur at the park. However, impacts are expected to be less than significant with mitigation measures incorporated.
ii. The nearest police station is Baldwin Park Police Department, approximately 2.1 miles northeast of the Project at 14403 Pacific Avenue, Baldwin Park, CA 91706. If at any point during construction it is needed to close lanes or affect the flow of traffic, emergency services will be notified 10 days before construction. The construction of the Project could attract people for recreational purposes, and therefore, could impact police services in the future. However, impacts are expected to be less than significant with mitigation measures incorporated.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 42 -
iii. The nearest schools are Tracy Elementary School, 0.4 miles northeast at 13350 Tracy Street, Baldwin Park, CA 91706, De Anza Elementary School, 0.5 miles northwest at 12820 Bess Avenue, Baldwin Park, CA 91706, and Torch Middle School, 0.6 miles southeast at 751 Vineland Avenue, Bassett, CA 91746. The Project is not anticipated to impact operations or increase student population. The Project will temporarily impact normal traffic levels during construction; therefore, impacts would be less than significant.
iv. The proposed Project will enhance open space areas. This will provide a benefit to the community and help reach the goals from the City’s General Plan. Consequently, other parks’ number of recreational users may fluctuate. Therefore, there is a less than significant impact.
v. Other services, such as City Hall, public libraries, and municipal services, are located outside of the Project’s area. While City staff will be needed to maintain park functions, impacts to service ratios are not expected to be significant. As a result, impacts would be less than significant.
Mitigation Measures:
PS-1 – The City shall provide reasonable advance notification to service providers such as fire, police, and emergency medical services as well as to local businesses, homeowners, and other residents adjacent to and within areas potentially affected by the proposed Project about the nature, extent, and duration of construction activities. Interim updates should be provided to inform the public of the status of the construction activities.
PS-2 – The City shall provide advance notice (at least 10-days prior) to emergency (fire, police, medical) services for any lane or street closures that may impact traffic circulation during construction.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 43 -
3.16 Recreation
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Would the project increase the use of existing
neighborhood and regional parks or other
recreational facilities such that substantial physical
deterioration of the facility would occur or be
accelerated?
X
b) Does the project include recreational facilities or
require the construction or expansion of
recreational facilities which might have an adverse
physical effect on the environment?
X
Discussion:
a) The proposed Project will enhance public park space within an urban environment. While this may result in increased use of existing neighborhood parks, potentially accelerating the physical deterioration of those facilities, no population growth is anticipated. Key BMPs, including the installation of bioswales and/or rain gardens, will be implemented alongside improvements to park facilities and city infrastructure. Therefore, the impacts are expected to be less than significant.
b) The proposed Project will feature amenities such as a nature-based playground, shade structure, outdoor fitness equipment, picnic areas, restroom facility, irrigation system and walking path with solar lighting, and recycled benches and tables. The native plants and pollinator garden in the proposed park is likely to enhance the surrounding environment, thereby increasing and improving the recreational services available to the local community. Consequently, impacts are expected to be less than significant.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 44 -
3.17 Transportation/Traffic
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Conflict with a program plan, ordinance or policy
addressing the circulation system, including transit,
roadway, bicycle and pedestrian facilities?
X
b) Would the project conflict or be inconsistent
with CEQA Guidelines section 15064.3, subdivision
(b)?
X
c) Substantially increase hazards due to a
geometric d esign feature (e.g., sharp curves or
dangerous intersections) or incompatible uses
(e.g., farm equipment)?
X
d) Result in inadequate emergency access? X
Discussion:
a) The Project will not conflict with any program, plan, ordinance, or policy addressing the circulation system. Roadways will not be modified as part of the Project, and therefore, no impacts are anticipated. There are no bike lanes or bike routes within the project site, so no impacts are anticipated in this regard. Although Baldwin Park Transit routes are along the Project area boundary on Dalewood Street, roadway impacts will be temporary during construction and return to normal usage once construction is completed. During design, the project developers should review if any multi-modal infrastructure, including ADA-compliant sidewalks, high-visibility crosswalks, Class IV bike lanes, and bike parking can be incorporated on site. While construction activities may temporarily affect pedestrian crosswalks and surrounding roads, these impacts are expected to be less than significant.
b) CEQA Guidelines Section 15064.3(b) provides criteria for evaluating transportation impacts, including those related to land use and transportation projects, qualitative analysis, and methodology.
According to the guidelines, projects located within 0.5 miles of an existing transit stop or transit corridor are presumed to result in a less-than-significant transportation impact. Although there are transit stops within 0.5 miles of the project site, the Project is not anticipated to interfere with these transit stops or affect transit routes. Therefore, transportation impacts are anticipated to be less than significant.
c) The Project does not require street reconfiguring, lane geometry and re-striping for vehicles and bicycles, lane transitions, transit stop and bus shelters, or curb and street engineering modifications.
The Project will not alter any traffic design features and therefore, there is no anticipated impact.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 45 -
d) The Project is near Highway 10, which is designated as a freeway disaster route. However, there are no anticipated impacts to the highway. Because the project sites do not anticipate an increase in population to the area, emergency services are not expected to be impacted. While it is expected that the majority of construction activities of the Project would be confined on-site, construction activities may involve temporary lane closures in the surrounding areas. With the mitigation measure TRAF-1 through TRAF-2, the Project will provide emergency access at all times and therefore will not result in inadequate emergency access. Therefore, impacts will be less than significant with mitigation measures.
Mitigation Measures:
TRAF-1 – The Contractor will notify local Police and Fire Departments in its intent to for lane closure at least ten (10) days before Work is to begin. The Contractor shall cooperate with local authorities relative to handling traffic through the area.
TRAF-2 – Transportation of heavy construction equipment and/or materials which requires use of oversized-transport vehicles on State highways will need a Caltrans transportation permit. Project specifications will limit construction traffic to off-peak periods to minimize the potential impact on State facilities. If construction traffic is expected to cause delays on any State facilities, a construction traffic control plan detailing these delays shall be submitted for Caltrans’ review.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 46 -
3.18 Tribal Cultural Resources
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Cause a substantial adverse change in the
significance of a tribal cultural resource, defined in
Public Resources Code section 21074 as either a
site, feature, place, cultural landscape that is
geographically defined in terms of the size and
scope of the landscape, sacred place, or object
with cultural value to a California Native American
tribe, and that is:
i) Listed or eligible for listing in the California
Register of Historical Resources, or in a local
register of historical resources as defined in Public
Resources Code section 5020.1(k), or
X
ii) A resource determined by the lead agency, in
its discretion and supported by substantial
evidence, to be significant pursuant to criteria set
forth in subdivision (c) of Public Resources Code
Section 5024.1. In applying the criteria set forth in
subdivision (c) of Public Resource Code Section
5024.1, the lead agency shall consider the
significance of the resource to a California Native
American tribe.
X
Discussion:
a)
i. According to the Cultural Resource Assessment conducted by Dudek in May 2025, the Sacred Lands File search with the NAHC has been completed, and results are negative for Native American cultural resources within one mile of the Project. Although there are no known tribal cultural resources identified at the project site to date, consultation and mitigation measures below would ensure impacts to Sacred Lands or tribal cultural resources would be less than significant with mitigation incorporated.
ii. The California Native American Heritage Commission (NAHC) was consulted about the Project and results were negative for sacred sites within the project area.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 47 -
The City of Baldwin Park sent out notification letters to the Soboba Band of Luiseno Indians, Gabrieleno Band of Mission Indians-Kizh Nation, and Gabrieleno-Tongva Tribe, pursuant to Assembly Bill 52 and Public Resources Code Section 21080.3.1.
Mitigation Measures:
TCR-1 – Retain a Native American Monitor 30 Days Prior to Commencement of Ground-Disturbing Activities.
The City of Baldwin Park shall retain a Native American Monitor. The monitor shall be retained prior to the commencement of any “ground-disturbing activity” for the subject project at all project locations (i.e., both on-site and any off-site locations that are included in the project description/definition and/or required in connection with the project, such as public improvement work). “Ground-disturbing activity” shall include, but is not limited to, demolition, pavement removal, potholing, auguring, grubbing, tree removal, boring, grading, excavation, drilling, and trenching.
The monitor will complete daily monitoring logs that will provide descriptions of the relevant ground-disturbing activities, the type of construction activities performed, locations of ground- disturbing activities, soil types, cultural-related materials, and any other facts, conditions, materials, or discoveries of significance to the Tribe. Monitor logs will identify and describe any discovered TCRs, including but not limited to, Native American cultural and historical artifacts, remains, places of significance, etc., (collectively, tribal cultural resources, or “TCR”), as well as any discovered Native American (ancestral) human remains and burial goods. Copies of monitor logs will be provided to the City of Baldwin Park upon written request to the Tribe.
Upon discovery of any TCRs, all construction activities in the immediate vicinity of the discovery shall cease (i.e., not less than the surrounding 50 feet) and shall not resume until the discovered TCR has been fully assessed by the Native American Monitor or qualified archaeologist. The Native American Monitor or qualified archaeologist will recover and retain all discovered TCRs in the form and/or manner the Tribe deems appropriate, in the Tribe’s sole discretion, and for any purpose the Tribe deems appropriate, including for educational, cultural and/or historic purposes.
TCR-2 – Unanticipated Discovery of Human Remains and Associated Funerary Objects
Native American human remains are defined in PRC 5097.98 (d)(1) as an inhumation or cremation, and in any state of decomposition or skeletal completeness. Funerary objects, called associated grave goods in Public Resources Code Section 5097.98, are also to be treated according to this statute.
If Native American human remains and/or grave goods discovered or recognized on the project site, then all construction activities shall immediately cease. Health and Safety Code Section 7050.5 dictates that any discoveries of human skeletal material shall be immediately reported to the County Coroner and all ground-disturbing activities shall immediately halt and shall remain halted until the coroner has determined the nature of the remains. If the coroner recognizes the human remains to be those of a Native American or has reason to believe they are Native American, he or she shall contact, by telephone within 24 hours, the Native American Heritage Commission, and Public Resources Code Section 5097.98 shall be followed.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 48 -
Human remains and grave/burial goods shall be treated alike per California Public Resources Code section 5097.98(d)(1) and (2).
Construction activities may resume in other parts of the project site at a minimum of 200 feet away from discovered human remains and/or burial goods, if the monitor determines in its sole discretion that resuming construction activities at that distance is acceptable and provides the project manager express consent of that determination (along with any other mitigation measures the Native American monitor and/or archaeologist deems necessary). (CEQA Guidelines Section 15064.5(f).)
Preservation in place (i.e., avoidance) is the preferred manner of treatment for discovered human remains and/or burial goods. Any historic archaeological material that is not Native American in origin (non-TCR) shall be curated at a public, non-profit institution with a research interest in the materials, if such an institution agrees to accept the material. If no institution accepts the archaeological material, it shall be offered to a local school or historical society in the area for educational purposes.
Any discovery of human remains/burial goods shall be kept confidential to prevent further disturbance.
TCR-3 – Procedures for Burials and Funerary Remains
The Burial Policy of the MLD shall be implemented. “Human remains” encompasses more than human bones. In ancient as well as historic times, Tribal Traditions included, but were not limited to, the preparation of the soil for burial, the burial of funerary objects with the deceased, and the ceremonial burning of human remains.
If the discovery of human remains includes four or more burials, the discovery location shall be treated as a cemetery and a separate treatment plan shall be created.
The prepared soil and cremation soils are to be treated in the same manner as bone fragments that remain intact. Associated funerary objects are objects that, as part of the death rite or ceremony of a culture, are reasonably believed to have been placed with individual human remains either at the time of death or later; other items made exclusively for burial purposes or to contain human remains can also be considered as associated funerary objects. Cremations will either be removed in bulk or by means as necessary to ensure complete recovery of all sacred materials.
In the case where discovered human remains cannot be fully documented and recovered on the same day, the remains will be covered with muslin cloth and a steel plate that can be moved by heavy equipment placed over the excavation opening to protect the remains. If this type of steel plate is not available, a 24-hour guard should be posted outside of working hours. The Tribe will make every effort to recommend diverting the project and keeping the remains in situ and protected. If the project cannot be diverted, it may be determined that burials will be removed.
In the event preservation in place is not possible despite good faith efforts by the project applicant/developer and/or landowner, before ground-disturbing activities may resume on the
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 49 -
project site, the landowner shall arrange a designated site location within the footprint of the project for the respectful reburial of the human remains and/or ceremonial objects.
Each occurrence of human remains and associated funerary objects will be stored using opaque cloth bags. All human remains, funerary objects, sacred objects and objects of cultural patrimony will be removed to a secure container on site if possible. These items should be retained and reburied within six months of recovery. The site of reburial/repatriation shall be on the project site but at a location agreed upon between the Tribe and the landowner at a site to be protected in perpetuity. There shall be no publicity regarding any cultural materials recovered.
The Tribe will work closely with the project’s qualified archaeologist to ensure that the excavation is treated carefully, ethically and respectfully. If data recovery is approved by the Tribe, documentation shall be prepared and shall include (at a minimum) detailed descriptive notes and sketches. All data recovery data recovery-related forms of documentation shall be approved in advance by the Tribe. If any data recovery is performed, once complete, a final report shall be submitted to the Tribe and the NAHC. The Tribe does NOT authorize any scientific study or the utilization of any invasive and/or destructive diagnostics on human remains.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 50 -
3.19 Utilities and Service Systems
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Require or result in the relocation or construction
of new or expanded water, wastewater treatment
or storm water drainage, electric power, natural
gas, or telecommunication facilities, the
construction or relocation of which could cause
significant environmental effects?
X
b) Have sufficient water supplies available to serve
the project a nd reasonably foreseeable future
development during normal, dry, and multiple dry
years?
X
c) Result in a determination by the wastewater
treatment provider which serves or may serve the
project that it has adequate capacity to serve the
project’s projected demand in addition to the
provider’s existing commitments?
X
d) Generate solid waste in excess of State or local
standards, or in excess of the capacity of local
infrastructure, or otherwise impair the attainment of
solid waste reduction goals?
X
e) Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste?
X
Discussion:
a) The proposed Project includes the construction of a stormwater infiltration system. Additionally, the Project will enhance the existing park and open space area. The Project is not expected to significantly increase the load on any utility or service system. Impacts will be mitigated through improvements in water quality, increased groundwater supply, and the revitalization of park facilities with nature-based stormwater management solutions. Therefore, the impacts are expected to be less than significant.
b) The proposed Project will incorporate native, predominantly drought-tolerant landscaping, allowing the plants to thrive during both normal and dry years. The design also includes the installation of efficient, low-water-use irrigation systems. The Project’s bioswale basin will rely on water to enhance the local water supply. Therefore, the impacts are anticipated to be less than significant.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 51 -
c) The Project includes the construction of a restroom facility in the park. The restroom will have a minimal increase in wastewater generated from the site as the site is a park facility and has minimal wastewater at the site. There is existing City sewer in the area that has the capacity to handle this increased wastewater flow. Therefore, this is not anticipated to significantly increase the capacity of wastewater demand for the treatment provider. Therefore, the impacts are anticipated to be less than significant.
d) During construction, some debris may be generated. However, the amount of waste is expected to be minimal and should not exceed the capacity of local infrastructure or interfere with the achievement of solid waste reduction goals. Therefore, impacts to local infrastructure and solid waste reduction goals are expected to be less than significant.
e) Waste disposal BMPs involve strategies to reduce, manage, and properly dispose of waste generated during construction or operation. These practices include waste segregation, recycling, hazardous waste management, and minimizing waste generation, ensuring that materials are disposed of in an environmentally responsible manner while complying with all applicable federal, state, and local regulations. Disposal will adhere to all relevant regulatory requirements. Therefore, no significant impacts are anticipated.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 52 -
3.20 Wildfire
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Substantially impair an adopted emergency
response plan or emergency evacuation plan? X
b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose
project occupants to, pollutant concentrations from
a wildfire or the uncontrolled spread of a wildfire?
X
c) Require the installation or maintenance of
associated infrastructure (such as roads, fuel
breaks, emergency water sources, power lines or
other utilities) that may exacerbate fire risk or that
may result in temporary or ongoing impacts to the
environment?
X
d) Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes?
X
Discussion:
a) According to the CAL FIRE Fire Hazard Severity Zones Viewer, the Project area is not within a fire hazard severity zone. Although the Project may impact traffic on the surrounding roads, and emergency services will be notified 10 days in advance before road closures. Therefore, there is less than significant impact anticipated.
b) The proposed Project will feature native vegetation, which are all flammable and susceptible to wildfires, but due to the Project’s location in a highly urbanized area, there is no potential for wildfires. Therefore, there would be no anticipated impact.
c) The Project will not require the installation or maintenance of infrastructure, such as roads, fuel breaks, emergency water sources, power lines, or other utilities that may exacerbate fire risk.
Therefore, the Project would not exacerbate fire risk, and there would be no impact.
d) The Project is built on a relatively flat and urbanized area. The Project is not anticipated to expose people or structures to significant risks of flooding or landslides. Therefore, there would be no anticipated impact.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 53 -
3.21 Mandatory Findings of Significance
Would the project:
Environmental Issue
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Does the project have the potential to
substantially degrade the quality of the
environment, substantially reduce the habitat of a
fish or wildlife species, cause a fish or wildlife
population to drop below self-sustaining levels,
threaten to eliminate a plant or animal community,
substantially reduce the number or restrict the
range of a rare or endangered plant or animal or
eliminate important examples of the major periods
of California history or prehistory?
X
b) Does the project have impacts that are
individually limited, but cumulatively considerable?
("Cumulatively considerable" means that the
incremental effects of a project are considerable
when viewed in connection with the effects of past
projects, the effects of other current projects, and
the effects of probable future projects)?
X
c) Does the project have environmental effects
which will cause substantial adverse effects on
human beings, either directly or indirectly?
X
Discussion:
a) Due to its location in an urbanized environment, the Project is not anticipated to affect the quality of the environment, habitat, fish, wildlife, or plant populations at the project site during construction or post-construction. Consequently, the Project will result in a less-than-significant impact, provided that appropriate mitigation measures are implemented.
b) The proposed Project would result in significant impacts unless mitigated for the following environmental issues: air quality, biology, cultural, noise, public services, transportation, and tribal cultural resources. Mitigation measures have been identified for each of these environmental areas to reduce impacts to a level that is less than significant. Cumulatively, the proposed Project will not result in any significant impacts that would combine substantially with impacts from other current or foreseeable future developments, assuming all other projects within the city comply with the established regulatory framework.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 54 -
c) The Project may have potential environmental effects on humans, most of which would be related to construction activities. These impacts are primarily associated with noise and air quality. As discussed in Section 3.3 and Section 3.13, these impacts are considered less than significant, or mitigation measures will be implemented to protect nearby sensitive receptors.
The Project will comply with all applicable local, state, and federal regulations. Therefore, potential impacts on human health and well-being would be less than significant with the incorporation of mitigation measures.
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 55 -
4. References
Baldwin Park, City of. City of Baldwin Park 2020 General Plan. Air Quality Element. November 2002. https://www.baldwinpark.com/DocumentCenter/View/569/Air-Quality-PDF
Baldwin Park, City of. City of Baldwin Park 2020 General Plan. Circulation Element. November 2002. https://www.baldwinpark.com/DocumentCenter/View/558/Circulation-PDF
Baldwin Park, City of. City of Baldwin Park 2020 General Plan. Land Use Element. November 2002. https://www.baldwinpark.com/DocumentCenter/View/562/Land-Use-PDF
Baldwin Park, City of. City of Baldwin Park 2020 General Plan. Noise Element. November 2002. https://www.baldwinpark.com/DocumentCenter/View/563/Noise-PDF
Baldwin Park, City of. City of Baldwin Park 2020 General Plan. Open Space and Conservation Element.
November 2002.
https://www.baldwinpark.com/DocumentCenter/View/564/Open-Space-Conservation- PDF#:~:text=The%20City's%20Park%20Master%20Plan%20designates%20over%20530%20ac res%20of,%2Dway%2C%20and%20water%20channels.
Baldwin Park, City of. City of Baldwin Park 2020 General Plan. Public Safety Element. November 2002. https://www.baldwinpark.com/DocumentCenter/View/565/Public-Safety-PDF
Baldwin Park, City of. City of Baldwin Park 2020 General Plan. Urban Design Element. November 2002. https://www.baldwinpark.com/DocumentCenter/View/566/Urban-Design-PDF
Baldwin Park, City of. City of Baldwin Park General Plan. Health and Sustainability Element. April 1, 2015.
https://www.baldwinpark.com/DocumentCenter/View/568/Health-and-Sustainability-Element-PDF
Baldwin Park, City of. City of Baldwin Park General Plan Land Use Map. September 2023. https://www.baldwinpark.com/DocumentCenter/View/598/General-Plan-Map-Updated- September-2023-PDF?bidId=
CAL FIRE. Fire Hazard Severity Zones in SRA. 2024.
https://osfm.fire.ca.gov/what-we-do/community-wildfire-preparedness-and-mitigation/fire- hazard-severity-zones
Cal OES. MyHazards.
https://myhazards.caloes.ca.gov/
CalEEMod. California Emissions Estimator Model.
CalEEMod - https://www.caleemod.com/model
California Department of Conservation. California Important Farmland Finder. https://maps.conservation.ca.gov/dlrp/ciff/
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- 56 -
California Department of Conservation. California Williamson Act Enrollment Finder. https://maps.conservation.ca.gov/dlrp/WilliamsonAct/
California Department of Conservation. Earthquake Fault Zones. https://maps.conservation.ca.gov/cgs/informationwarehouse/eqzapp/
California Department of Toxic Substances Control. Envirostor. https://www.envirostor.dtsc.ca.gov/public/map/?global
California Department of Transportation. California Scenic Highway Mapping System. https://caltrans.maps.arcgis.com/apps/webappviewer/index.html?id=465dfd3d807c46cc8e80571 16f1aacaa
City of Baldwin Park Press Release. September 30, 2024. https://www.baldwinpark.com/DocumentCenter/View/2447/24-10-Baldwin-Park-Secures-21- Million-Federal-Grant-to-Build-New-Roadside-Park
Cultural Resources Inventory Letter Report for the Roadside Park Project, City of Baldwin Park, California. Dudek. May 20, 2025.
FEMA Flood Map Service Center.
https://msc.fema.gov/portal/search?AddressQuery=manhattan%20beach%2C%20ca#searchresu ltsanchor
Los Angeles County. Disaster Routes. September 8, 2008. https://pw.lacounty.gov/dsg/DisasterRoutes/map/Baldwin%20Park.pdf
Los Angeles Geohub. County of Los Angeles Landslide Zones. August 24, 2022. https://geohub.lacity.org/datasets/306103cb524845368d5ae2923fbdccb3/explore?location=34.05 4059%2C-117.953818%2C12.57
National Ambient Air Quality Standards and California Ambient Air Quality Standards Attainment Status for South Coast Air Basin.
https://www.aqmd.gov/docs/default-source/clean-air-plans/air-quality-management-plans/naaqs- caaqs-feb2016.pdf?sfvrsn=2
South Coast Air Quality Management District.
https://www.aqmd.gov/docs/default-source/default-document-library/map-of-jurisdiction.pdf
United States Department of Agriculture, Natural Resources Conservations Service. Web Soil Survey. https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx
United States Fish and Wildlife Service. National Wetlands Inventory. Wetlands Mapper. https://www.fws.gov/wetlands/Data/Mapper.html
United States Fish and Wildlife Service. Information for Planning and Consultation. Species Mapper. https://ipac.ecosphere.fws.gov/location/index
LEGEND
1 2
3 3 5
5 6
6 7
8 14
4 9
10 11
12 13
10- FREEWAY
D ALEW OOD ST
ALLEY
LEORITA ST.
ROADSIDE PARK WESTADSIDE PARK WEST ROADSIDE PARK EASTADSIDE PARK EAST 15 1
2 3
4 5
6 7
RESTROOM
SOLAR LIGHTING
DROUGHT TOLERANT LANDSCAPING AND MULCH
NATURE BASED PLAYGROUND
BOULDER FORMATION W/INTERPRETIVE SIGNAGE
DECORATIVE PERIMETER FENCING
SAIL SHADE STRUCTURE
8 15
9 10
11 12
13 14
SEATWALL
PICNIC TABLE ADA
TRASH RECEPTACLE
BENCH
BIO SWALE
MEANDERING WALKING PATH
SINGLE UNIT FITNESS EQUIPMENT
POLLINATOR GARDEN
ENTRY POINT
1614
16 16
Initial Study and Mitigated
Negative Declaration
City of Baldwin Park
Roadside Park Project
State Clearinghouse No. 2025070965
1561 E. Orangethorpe Avenue, Suite 240
Fullerton, California 92831
TEL (714) 526-7500 | FAX (714) 526-7004
www.cwecorp.com
REVISED
Initial Study and
Mitigated Negative Declaration
Roadside Park Project
State Clearinghouse No. 2025070965
Prepared for:
City of Baldwin Park
14403 E. Pacific Avenue
Baldwin Park, California 91706
TEL (626) 813 5269
Prepared by:
1561 E. Orangethorpe Avenue, Suite 240
Fullerton, California, 92831
TEL (714) 526-7500 | FAX (714) 526-7004 | www.cwecorp.com
August 2025
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- i -
Table of Contents
T
ABLE OF CONTENTS .................................................................................................................. i LIST OF FIGURES .......................................................................................................................ii LIST OF TABLES ..........................................................................................................................ii ACRONYMS ................................................................................................................................iii
1. INTRODUCTION . .............................................................................................................. 1
1.1 PURPOSE AND DOCUMENT ORGANIZATION.................................................................................... 1
1.2 SUMMARY OF FINDINGS .......................................................................................................... 1
2. PROJECT DESCRIPTION . ................................................................................................. 2
2.1 PROJECT LOCATION ............................................................................................................... 4
3. INITIAL STUDY/ENVIRONMENTAL CHECKLIST . ............................................................. 5
3.1 AESTHETICS ........................................................................................................................ 8
3.2 AGRICULTURE AND FORESTRY RESOURCES ................................................................................. 10
3.3 AIR QUALITY ..................................................................................................................... 12
3.4 BIOLOGICAL RESOURCES ....................................................................................................... 15
3.5 CULTURAL RESOURCES ......................................................................................................... 18
3.6 ENERGY ........................................................................................................................... 21
3.7 GEOLOGY AND SOILS ........................................................................................................... 22
3.8 GREENHOUSE GAS EMISSIONS ................................................................................................ 25
3.9 HAZARDS AND HAZARDOUS MATERIALS ..................................................................................... 26
3.10 HYDROLOGY AND WATER QUALITY ....................................................................................... 28
3.11 LAND USE AND PLANNING .................................................................................................. 30
3.12 MINERAL RESOURCES ....................................................................................................... 31
3.13 NOISE .......................................................................................................................... 32
3.14 POPULATION AND HOUSING ................................................................................................ 40
3.15 PUBLIC SERVICES ............................................................................................................ 41
3.16 RECREATION .................................................................................................................. 43
3.17 TRANSPORTATION/TRAFFIC ................................................................................................ 44
3.18 TRIBAL CULTURAL RESOURCES ............................................................................................ 46
3.19 UTILITIES AND SERVICE SYSTEMS ......................................................................................... 50
3.20 WILDFIRE ..................................................................................................................... 52
3.21 MANDATORY FINDINGS OF SIGNIFICANCE ............................................................................... 53
4. REFERENCES . ................................................................................................................. 55
City of Baldwin Park California Environmental Quality Act Initial Study/Mitigated Negative Declaration
- ii -
List of Figures
Figure 2-1 Project Location ................................ ................................ ................................ ............ 4 Figure 3-1 Noise Measurement Locations ................................ ................................ ....................... 34
List of Tables
Table 3-1 Daily Emissions for Construction of the Project ................................ ................................ . 13 Table 3-2 Greenhouse Gas Emissions for Project ................................ ................................ ............ 25 Table 3-3 Noise Assessment Results ................................ ................................ .............................. 33 Table 3-4 City of Baldwin Park Land Use Guidelines for Exterior Noise ................................ ................ 35 Table 3-5 Construction Equipment Noise Emission Levels ................................ ................................ . 36 Table 3-6 Construction Equipment Vibration Reference Levels ................................ .......................... 39