Cities Index.
Agenda packet, regular meeting, third session

Banning City Council
July 9, 2024

Document
Agenda packet, regular meeting, third session
Meeting
July 9, 2024
Body
Banning City Council
Pages
33
Original file
328.6 MB
Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

3. Prioritized inspections and monitoring based on sampling and monitoring results and other metrics to help target activities that present the highest risk to water quality.

D. During the fourth term Order, the following revisions to the Public Education and Outreach Program will be priorities:

1. Continue coordination of public education outreach with adjacent MS4s.

2. Continue to evaluate and enhance outreach materials for IC/IDs, nutrients, fertilizers, and pesticides.

3. Continue to focus the Public Education and Outreach Program on the Pollutants causing the greatest impacts to water quality, determined by the monitoring results and the list of Impaired Waterbodies [303(d) list].

The Permittees have already taken several steps in this direction. For example, the Permittees have provided spray bottles with environmentally friendly pesticide recipes printed on the side to residents at community fairs; the Permittees have developed or are in the process of developing brochures for septic system management, landscape management, and gardening; the Riverside and San Bernardino County Permittees are coordinating on a Curiosity Quest Episode (KVCR Family Show) to promote BMPs for nutrients, fertilizers and pesticides and the Permittees place information in hardware and gardening stores regarding pesticide and fertilizer management. The Permittees also incorporate other materials to address general Pollutants of Concern.

E. As a result of continued program effectiveness assessment the Permittees propose to update Annual Reporting forms to incorporate specific reporting requirements for all effectiveness assessment metrics.

F. Enhanced online watershed maps to assist developers and the public with identifying areas tributary to Impaired Waterbodies.

G. WQMP

1. The Permittees committed to maintain the “Frequently Asked Questions” information sheet for New Development and Significant Redevelopment projects to assist with the development and implementation of the revised WQMP.

January 29, 2010 Final
878
Fact Sheet – Continued Page 28 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit)

2. The Permittees committed to update the Riverside County Storm Water Quality Best Management Practice Design Handbook to (1) better incorporate LID design concepts, (2) incorporate guidance to describe how developments can offset Hydromodification impacts with LID and (3) incorporate additional design guidance to ensure maintainability and functionality of BMPs, throughout the life of the development. This Order further requires the Permittees to revise the WQMP consistent with the requirements of the Order.

3. The Permittees committed to maintain the WQMP template to assist developers with developing a project-specific WQMP.

4. An audit of each of the Permittees’ Urban Runoff management programs during the third term MS4 Permit indicated no clear nexus between the watershed protection principles, including LID techniques, specified in the WQMP and the Permittees’ General Plan or related documents such as Development Standards, Zoning Codes, Conditions of Approval, Project Development Guidance, etc.. It appears that many of the existing procedures, Development Standards, Ordinances and Municipal Codes may be barriers to implement LID BMPs. This Order requires the Permittees to facilitate LID techniques specified in this Order.

H. The Regional Board has proposed a revised Notice of Intent and Notice of Termination for Permittee construction projects to assist Regional Board staff with identifying locations and owners of Permittee projects.

I. The Permittees have committed to annual updates to Sanitary Sewer Overflow Procedures to ensure proper contact information for Permittee and outside agencies.

J. WATERSHED APPROACH

1. TMDL for Bacterial Indicator in the MSAR subwatershed and nutrients in the Canyon Lake and Lake Elsinore subwatershed are incorporated into this Order (See Section V.C). The Permittees support TMDL implementation and agreed to participate in a comprehensive water quality monitoring program to ensure that Urban Runoff meets the Water Quality Objectives identified in the Basin Plan and are consistent with the WLAs specified in the TMDLs. This Order requires that, consistent with the requirements of the respective TMDL Implementation Plans, the Permittees use the water quality monitoring of Urban Runoff to evaluate the effectiveness of the BMP programs.

January 29, 2010 Final
879
Fact Sheet – Continued Page 29 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit)

2. The USEPA has recommended a shift to watershed-based NPDES permitting8 and watershed approach9 to CWA programs, including NPDES programs. The Permittees and the Regional Board also recognize that a watershed-based approach is expected to be effective in controlling Pollutants in Urban Runoff.

Consistent with this approach, this Order requires the Permittees to develop and implement programs that integrate Hydromodification and water quality management strategies with land use planning policies, ordinances, and plans within each jurisdiction. A watershed approach considers the diverse Pollutant sources and stressors and watershed goals within a defined geographic area (i.e., watershed boundaries). A watershed approach has three basic components:
a. Geographic Focus: Watersheds are nature’s boundaries. They are the land areas that drain to surface waterbodies, and they generally include lakes, rivers, estuaries, wetlands, streams, and the surrounding landscape.

Groundwater recharge areas are also considered.
b. Sound Management Techniques Based on Strong Science and Data: Sound scientific data, tools, and techniques are critical to evaluate the process.

Actions taken include characterizing priority watershed water quality problems and solutions, developing and implementing action plans, and evaluating their effectiveness within the watershed.
c. Partnerships/Stakeholder Involvement: Watersheds transcend political, social, and economic boundaries. Therefore, it is important to involve all the affected interests in designing and implementing goals for the watershed.

Watershed teams may include representatives from all levels of government, public interest groups, industry, academic institutions, private landowners, concerned citizens, and others.

There are two major sub-watersheds in Riverside County within the Permit Area – the MSAR subwatershed, consisting of the portions of the Permit Area that drain to Reaches 3 and 4 of the Santa Ana River, and the San Jacinto River subwatershed, which consists of the portions of the Permit Area that drain to Lake Elsinore. The Permittees participate in the MSAR TMDL Task Force and the Lake Elsinore and Canyon Lake TMDL Task Forces, which are stakeholder driven, watershed-based efforts to address Pollutants of Concern in the respective subwatersheds. The Permittees have also implemented several stakeholder driven, watershed-based conservation programs such as the Special Area Management 8 USEPA: Watershed-based NPDES permitting is a process that emphasizes addressing all stressors within a hydrologically-defined drainage basin, rather than addressing individual Pollutant sources on a discharge-by-discharge basis.
9 USEPA (1996a): “The watershed approach is a coordinating framework for environmental management that focuses public and private sector efforts to address the highest priority problems within hydrologically defined geographic areas, taking into consideration both ground and surface water flow.” January 29, 2010 Final
880
Fact Sheet – Continued Page 30 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) Plan, the Western Riverside County Multiple Species Conservation Plan, the San Jacinto River Integrated Watershed Management Plan and the Santa Ana Watershed Project Authority One Water One Watershed Plan.

These efforts are also addressed and discussed in the DAMP, which integrates these efforts into a coherent and uniform compliance program to protect Receiving Waters. Due to economies of scale and the fact that many of the Permittees have jurisdiction in both sub-watersheds, the Permittees have opted to continue to implement uniform MS4 Permit compliance programs across the entire Permit Area (for example Permittee training programs educate inspectors about the impacts and sources of pathogens and nutrients as opposed to offering separate sub-watershed specific training programs for the San Jacinto and MSAR sub-watersheds). The Permittees have indicated that as source assessments and monitoring data results from the aforementioned watershed efforts produce findings regarding potential urban sources of Pollutants of Concern that they may opt, in the future, to develop specific action plans for the MSAR and San Jacinto River sub-watersheds, or potentially even tributaries there-of. If so, the DAMP will be appropriately modified to clarify the sub-watershed specific components.

The Permittees also currently implement interim Hydromodification criteria and have committed to revising their Hydromodification management programs based on studies currently being conducted by the SCCWRP. This Order requires the Permittees to continue to pursue these watershed planning efforts and enhance them as appropriate to address Pollutants of Concern.

J. To promote program transparency, each Permittee proposed to develop its own LIP that:
a. Specifies how each program element of the DAMP shall be implemented; b. Describes the ordinances, plans, policies, procedures, and tools (e.g., checklists, forms, educational materials, etc.) used to execute the DAMP; c. Identifies the organizational units responsible for implementation of each program element;
d. Establishes internal reporting requirements to ensure and promote accountability; and
e. Describes an adaptive method of evaluation and assessment of program effectiveness for the purpose of identifying program improvements.

K. The audits conducted by Regional Board staff have also shown a significant deficiency in measuring program effectiveness. This Order requires quantifiable measures for evaluating program effectiveness.

January 29, 2010 Final
881
Fact Sheet – Continued Page 31 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) L. The above-mentioned strategies for the fourth-term Order build upon and continue the programs and policies developed by the Permittees during the prior MS4 Permit terms as described in Sections VI and VII above.

M. A combination of these programs and policies and the requirements specified in this Order should ensure control of Pollutants in Urban Runoff from the MS4 owned and/or controlled by the Permittees.

VIII. ORDER REQUIREMENTS AND PROVISIONS
The legislative history of storm water statutes (1987 CWA Amendments), USEPA regulations (40CFR Parts 122, 123, and 124), and clarifications issued by the State Board (State Board Orders No. WQ 91-03 and WQ 92-04) indicate that a nontraditional NPDES permitting strategy was anticipated for regulating Urban Runoff.

Due to the economic and technical infeasibility of full-scale end-of-pipe treatments and the complexity of Urban Runoff quality and quantity, MS4 permits generally include narrative requirements for the implementation of BMPs in place of Numeric Effluent Limits.

The requirements included in this Order are meant to specify those management practices, control techniques and system design and engineering methods that will result in protection of the Beneficial Uses of the Receiving Waters consistent with the MEP standard. State Board (Orders No. WQ 98-01 and WQ 99-05) concluded that MS4s must meet the technology-based MEP standard and Water Quality Standards.

The U.S. Court of Appeals for the Ninth Circuit subsequently held that strict compliance with Water Quality Standards in MS4 permits is at the discretion of the local permitting agency.

The ROWD included a discussion of the current status of Riverside County’s Urban Runoff management program and the proposed programs and policies for the next five years (fourth-term Order). This Order incorporates these documents and specifies performance commitments for specific elements of the Permittees Urban Runoff management program.

This Order recognizes the significant progress made by the Permittees during the first three MS4 Permit terms in implementing the storm water regulations. This Order also recognizes regional and innovative solutions to such a complex problem, addresses deficiencies in the Permittees’ Urban Runoff programs observed during the audits conducted by Regional Board staff, and considers comments by the USEPA on other draft MS4 Permits. This Order specifies quantifiable performance measures to determine compliance and assess the effectiveness of the Urban Runoff programs.

This Order incorporates an integrated watershed approach in solving water quality and Hydromodification impacts resulting from urbanization and aims to promote LID techniques as a key element to mitigate impacts from New Development and Significant Redevelopment projects. The proposed Order also requires the Permittees January 29, 2010 Final
882
Fact Sheet – Continued Page 32 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) to implement TMDL WLA through iterative BMP programs as required in the respective approved TMDL Implementation Plans (See Section V.C). The goal of these programs and policies that are included in this Order is to achieve and maintain Water Quality Standards in the Receiving Waters.

The essential components of the Urban Runoff management program, as established by federal regulations [40 CFR 122.26(d)] are: (i) Adequate Legal Authority, (ii) Fiscal Resources, (iii) Storm Water Quality Management Program (SQMP) - (Public Information and Participation Program, Industrial/Commercial Facilities Program, Development Planning Program, Development Construction Program, Public Agency Activities Program, IC/IDs Elimination Program), and (iv) Monitoring and Reporting Program. The major sections of the requirements in this Order include: I. Facility Information, II. Findings, III. Permittee Responsibilities, IV. Local Implementation Plan, V. Discharge Prohibitions, VI. Effluent Limitations, Discharge Specifications and Other TMDL Related Requirements, VII. Receiving Water Limitations, VIII. Legal Authority/Enforcement, IX. Illicit Connections/Illegal Discharges; Litter, Debris and Trash Control, X. Sewage Spills, Infiltration into MS4 Systems from Leaking Sanitary Sewer Lines, Septic System Failures, and Portable Toilet Discharges, XI. Co-Permittee Inspection Programs, XII. New Development (including Significant Redevelopment), XIII. Public Education and Outreach, XIV. Permittee Facilities and Activities, XV.

Training Program For Storm Water Managers, Planners, Inspectors And Municipal Contractors, XVI. Notification Requirements, XVII. Program Management/DAMP Review, XVIII. Fiscal Resources, XIX. Monitoring and Reporting Program, XX.

Provisions, XXI Permit Modification, and XXII. Permit Expiration and Renewal.

These programs and policies are intended to improve Urban Runoff quality and protect the Beneficial Uses of Receiving Waters of the Permit Area.

A. RESPONSIBILITIES
The responsibilities of the Principal Permittee are to coordinate the overall Urban Runoff management program and the Co-Permittees are responsible for managing the Urban Runoff program within their jurisdictions as detailed in the ROWD and the proposed Order, Order No. R8-2010-0033.

The existing Implementation Agreement needs to be revised to include the cities that were not signatories to this Agreement. The Order requires that a copy of the signature page and any revisions to the Agreement be included in the specified Annual Report.

B. DISCHARGE PROHIBITIONS
In accordance with CWA Section 402(p)(3)(B)(ii), this Order prohibits the discharge of Non-storm Water to the MS4s, with a few exceptions. The specified exceptions are consistent with 40 CFR 122.26(d)(2)(iv)(B)(1). If the Permittees or the January 29, 2010 Final
883
Fact Sheet – Continued Page 33 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) Executive Officer determines that any of the exempted Non-storm Water discharges is a significant source of Pollutants, a separate NPDES permit or coverage under the Regional Board’s De Minimus Permit will be required.

C. EFFLUENT LIMITATIONS AND DISCHARGE SPECIFICATIONS, INCLUDING WASTE LOAD ALLOCATIONS FOR DISCHARGES TO 303(d) LISTED

WATERBODIES WITH ADOPTED TMDLS
The Order clarifies allowed discharges and those discharges (only from Permittee owned or operated facilities and activities) allowed only if certain discharge specifications are met, such as those covered under the De Minimus Permit.

These discharges should be consistent with the Regional Board’s General De Minimus Permit for Discharges to Surface Waters, Order No. R8-2009-0003, NPDES No. CAG 998001. Permittees’ de minimus discharges covered under this Order include: 1) dewatering wastes from subterranean seepage, except for discharges from utility vaults; 2) discharges resulting from hydrostatic testing of vessels, pipelines, tanks, etc.; 3) discharges resulting from the maintenance of potable water supply pipelines, tanks, reservoirs, etc.; 4) discharges resulting from the disinfection of potable water supply pipelines, tanks, reservoirs, etc.; 5) discharges from potable water supply systems resulting from initial system startup, routine startup, sampling of influent flow, system failures, pressure releases, etc.; 6) discharges from fire hydrant testing or flushing; 7) air conditioning condensate; 8) swimming pool discharges; 9) discharges resulting from diverted stream flows; and 10) construction dewatering wastes. The DAMP and the LIP are required to be revised to incorporate information regarding Permittees’ de minimus discharges.

This Order requires Permittees to implement established TMDL WLAs specified for Urban Runoff through an iterative BMP approach (see Section V.C above).

D. RECEIVING WATER LIMITATIONS
Receiving Water Limitations are included to ensure that discharges of Urban Runoff from MS4s do not cause or contribute to violations of applicable Water Quality Standards in Receiving Waters. The compliance strategy for Receiving Water Limitations is consistent with the USEPA and State Board guidance and recognizes the complexity of Urban Runoff management.

This Order requires the Permittees to meet Water Quality Standards in Receiving Waters in accordance with USEPA requirements, as specified in State Board Order No. WQ 99-05. If Water Quality Standards are not met through implementation of certain BMPs, the Permittees are required to re-evaluate the programs and policies and to propose additional BMPs. Compliance determination will be based on this iterative BMP implementation process.

January 29, 2010 Final
884
Fact Sheet – Continued Page 34 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) E. LEGAL AUTHORITY/ENFORCEMENT
Each Permittee has adopted ordinances, municipal codes, and other regulations to establish legal authority to control discharges to the MS4s and to enforce these regulations as specified in 40 CFR 122.26(d)(2)(I)(B, C, E, and F). The Permittees are required to enforce these ordinances and to take enforcement actions against violators (40 CFR 122.26(d)(2)(iv)(A-D)).

The enforcement activities undertaken by a majority of the Permittees have consisted primarily of Notices of Violation, which act to educate the public on the environmental consequences of Illegal Discharges. In the case of the County, additional action has sometimes included recovery of investigation and clean-up costs from the responsible parties. In the event of egregious or repeated violations, the option exists for a referral to the County District Attorney for possible prosecution or to the Regional Board for enforcement under the California Water Code or the CWA. In order to eliminate unauthorized, Nonstorm Water discharges, reduce the amount of Pollutants commingling with Urban Runoff and thereby protect water quality, an additional level of enforcement is required between Notices of Violation and District Attorney referrals.

The third term MS4 Permit required the Permittees to establish the authority and resources to administer either civil or criminal fines and/or penalties for violations of their Storm Water Ordinances. The Permittees now have this authority for penalties. Within the fourth term Order, Permittees are required to exercise this authority by developing an enforcement program to be administered within the industrial, commercial and construction elements of their Urban Runoff management programs. The enforcement program has been required to be included as an update to each Permittee’s LIP. The effectiveness of this program must be documented in the Annual Reports submitted by the Permittees. However, it is acknowledged that once cases have been referred to the District Attorney or Environmental Crimes Task Force, etc. for prosecution, case details are confidential.

The fourth term Order further requires the Permittees to document and implement progressive and decisive enforcement actions, evaluate the effectiveness of their enforcement program and sanctions by tracking compliance and evaluating the amount of time to return to compliance.

This Order requires the Permittees to include in the LIP their legal authority and mechanisms to implement the various program elements required by this Order to properly manage, reduce, and mitigate potential Pollutant sources within each Permittee’s jurisdiction. The LIP shall include citations of appropriate local ordinances, identification of departmental jurisdictions and key personnel in the implementation and enforcement of those ordinances. The LIP shall include January 29, 2010 Final
885
Fact Sheet – Continued Page 35 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) procedures, tools and timeframes for progressive enforcement actions and procedures for tracking compliance.

F. ILLICIT CONNECTIONS/ILLEGAL DISCHARGES; LITTER, DEBRIS AND

TRASH CONTROL
Federal regulation, 40 CFR 122.26(d)(2(iv)(B), requires the Permittees to eliminate illicit discharges to the MS4s. The Permittees have completed a survey of the MS4 and eliminated or permitted all identified Illicit Connections. The Permittees have also established a program to address Illegal Discharges and a mechanism to respond to spills and leaks and other incidents of discharges to the MS4.

The Permittees currently have several programs to address IC/IDs:

1. The Permittees operate a toll free phone line, provide e-mail access for filing complaints and take direct calls regarding IC/ID reports from third parties.

These reports are investigated by Permittee staff and reported in IC/ID investigation forms. All Permittee public education outreach materials promote the use of these reporting mechanisms.

2. Permittee staff receive training on identification and reporting of IC/IDs to appropriate Permittee staff. These reports are investigated and reported in IC/ID reporting forms.

3. The Permittees conduct Industrial and Commercial Facility and Construction Site inspections to identify potential IC/IDs. The outcomes of these inspections are reported in inspection reporting databases.

4. The Permittees contribute funds to the County Hazardous Materials Response Team to train and educate them to handle Illegal Discharges or accidental hazardous waste discharges so as to prevent IC/IDs. A summary of HAZMAT activities is provided in the Annual Reports.

5. The RCFC&WCD monitors Office of Emergency Service reports for potential IC/ID incidents and investigates them as appropriate. Results are reported in the RCFC&WCD complaint call database and reported to the Permittees as appropriate.

6. The RCFC&WCD has developed an online GIS tool that identifies the location of District and Permittee MS4 facilities to facilitate IC/ID investigations and response.

7. The Permittees have developed a Sanitary Sewer Overflow Procedure to limit the potential for sewage spills to the MS4.

8. RCFC&WCD, as Principal Permittee, has dedicated staff that conducts dry weather monitoring and also evaluates RCFC&WCD MS4 facilities for maintenance problems and/or IC/IDs. Detected IC/IDs from monitoring data or field inspections are reported to the District’s NPDES section, logged into January 29, 2010 Final
886
Fact Sheet – Continued Page 36 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) RCFC&WCDs complaint database, and reported to the appropriate Permittee for follow up action.

However, with a few exceptions, program evaluations conducted during the third term MS4 Permit showed that this program element is primarily complaint driven or an incidental component of municipal inspections or MS4 inspections for a number of Permittees. This Order requires the Permittees to ensure their LIPs describe each Permittee’s plan for focused, systematic IC/ID investigations, outfall reconnaissance surveys, indicator monitoring, and track their sources 10 .

A proactive Illicit Discharge Detection and Elimination (IDDE) program should be integrated with other LIP program elements as appropriate including: mapping of the Permittees’ MS4 to track sources, aerial photography, Permittee inspection programs for construction, industrial, commercial, MS4, Permittee facilities, etc., watershed monitoring, public education and outreach, Pollution Prevention, and rapid assessment of stream corridors to identify dry weather flows and illegal dumping.

G. SEWAGE SPILLS, INFILTRATION INTO MS4 SYSTEMS FROM LEAKING

SANITARY SEWER LINES, SEPTIC SYSTEM FAILURES, AND PORTABLE

TOILET DISCHARGES
Federal regulation, 40 CFR 122.26(d)(2)(iv)(B)(4), requires the Permittees to develop procedures to prevent, contain, and respond to spills that may discharge into the MS4s. The Permittees have already developed a program to address various types of spills to the MS4s. This Order requires the Permittees to continue to implement the unified sewer response plans in collaboration with the local sanitary sewer system operators. To facilitate swift response actions, the Permittees are required to provide 24-hour access to MS4s to the sanitary sewer system operators. The Permittees should also work cooperatively with the sanitary sewer system operators to determine if exfiltration from leaking sanitary sewer lines is causing or contributing to Urban Runoff Pollution problems. In addition, the Permittees are required to control infiltration or seepage from sanitary sewers to the MS4s through routine preventive maintenance of the MS4 (40 CFR 122.26(d)(2)(iv)(B)(7)). This Order also requires the Permittees to implement control measures and procedures to prevent, respond to, contain and clean up all sewage and other spills from sources such as portable toilets and septic systems.

On May 2, 2006, the State Board issued the Statewide General Waste Discharge Requirements for Sanitary Sewer Systems, Water Quality Order No. 2006-0003- DWQ (SSO Order) to address proper management and operation of sewer collection systems and to control sanitary sewer overflows. It requires dischargers/enrollees to develop and implement a written Sewer System Management Plan (SSMP) approved by the discharger’s governing board and 10 Table 2: Land uses, Generating Sites and Activities that Produce Indirect Discharges from IDDE, A Guidance Manual for Program Development and Technical Assessments, October 2004 CWP.

January 29, 2010 Final
887
Fact Sheet – Continued Page 37 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) report sewer spills through an on-line reporting system. This Order requires the Permittees have reviewed the unified sewage spill response plan developed during the third term MS4 Permit with the local sewering agencies and determined that it is consistent with the requirements of the SSO Order. This Order also requires each Permittee to include in its LIP the interagency or interdepartmental sewer spill response coordination and responsibilities.

The MS4 program audits indicated that a majority of the Permittees with septic systems have inadequate information with regard to the number and location of those systems within their jurisdiction. This Order requires the Permittees with septic systems to develop within 2 years of adoption of this Order, an inventory of septic systems within its jurisdiction and establish a program to ensure that failure rates are minimized.

H. CO-PERMITTEE INSPECTION PROGRAM;
Federal regulations, 40 CFR 122.26(d)(2)(iv)(A-D), require the Permittees to inventory, prioritize and inspect Industrial and Commercial Facilities and Construction Sites. This Order requires the Co-Permittees to continue inspections of Industrial and Commercial Facilities and Construction Sites within their jurisdiction in order to control the Pollutants entering the MS4. The Co-Permittees will continue to maintain the inventory of Industrial and Commercial Facilities and Construction Sites in the above categories, prioritize these facilities based on threat to water quality, and perform regular inspections to insure compliance with local ordinances. While initial observations of non-compliance may result in ‘educational’ type enforcement, repeated non-compliance will result in more disciplinary forms of enforcement, such as monetary penalties, stop work orders or permit revocation.

An evaluation of Permittee inspection programs during the third term MS4 permit indicated certain deficiencies in the Industrial and Commercial Facility and Construction Site inspection programs of some of the Permittees. In many instances, program documentation of progressive enforcement and facilities’ return to compliance were not properly documented. This Order requires Permittees to document inspections and enforcement and evaluate the effectiveness of their inspection and enforcement program by tracking the time for facilities or sites to return to compliance. The Permittees who do not have an internet accessible database are required to initiate quarterly reporting and update of the inventory, inspection and enforcement database for facilities within their jurisdiction.

January 29, 2010 Final
888
Fact Sheet – Continued Page 38 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) In order to address discharges to the MS4 from residential sources, the fourth term MS4 Permit requires the Permittees to develop and implement a residential program to prevent residential discharges from causing or contributing to a violation of Water Quality Standards in the Receiving Waters (40 CFR 122.26(d)(2)(iv)(A)).

I. NEW DEVELOPMENT (INCLUDING SIGNIFICANT REDEVELOPMENT) Federal regulation, 40 CFR 122.26(d)(2)(iv)(A)(2), requires the Permittees to develop a comprehensive master plan to address discharges from New Development and Significant Redevelopment projects. During the third term MS4 Permit, the Permittees revised their New Development guidelines to address water quality and Hydromodification impacts resulting from urbanization. A WQMP for Urban Runoff was approved by the Regional Board in 2004 and became effective in 2005. This Order requires the Permittees to continue to work towards the goal of restoring and preserving the natural hydrologic cycles in proposed urban developments by reviewing and approving project-specific WQMPs to address post-construction impacts. The WQMP should be designed to address water quality impacts, including Hydrologic Conditions of Concern (HCOC), from New Development and Significant Redevelopment projects through: (1) Site Design BMPs, including LID techniques; (2) Source Control BMPs; and (3) Treatment Control BMPs. This Order recognizes the importance of LID techniques to minimize the impact of urbanization on water quality. This Order requires the project proponents to infiltrate, harvest and reuse, evapotranspirate, or bio-treat the volume of runoff from a 24-hour, 85th percentile storm event where feasible. The Order also provides alternatives and in-lieu programs for project sites where infiltration, harvesting and re-use, evapotranspiration and bio-treatment are not feasible.

Program evaluations conducted during the third term MS4 Permit indicated a need for establishing a clear nexus between the watershed protection principles (including LID) and the planning and approval processes of the Permittees. This Order requires the Permittees to review and revise their Development Standards, Zoning Codes, Conditions of Approval, Development Project Guidance, ordinances, and other related documents to identify and eliminate barriers to incorporate watershed protection principles.

The SMC, including project lead agency, the San Bernardino County Flood Control District, in collaboration with SMC member, SCCWRP and the California Storm Water Quality Association (CASQA), is developing a LID Manual for Southern California with funding from the State Board, CASQA and other sources. This manual will be incorporated into the CASQA BMP Handbooks. The Permittees are encouraged to utilize the manual as a resource for proper LID design and implementation techniques.

Program evaluations have also suggested a need for improvement in the Permittees’ inspection, and tracking of post-construction BMPs. This Order requires the Permittees to revise their close-out procedures to include field January 29, 2010 Final
889
Fact Sheet – Continued Page 39 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) verification that Site Design, Source Control and Treatment Control BMPs are operational and consistent with the approved WQMP.

This Order incorporates new project categories and revised thresholds for several categories of New Development and Significant Redevelopment projects that trigger the requirement for a WQMP. New project categories include streets, roads and highways of 5,000 square feet or more of paved surface and retail gasoline outlets (RGOs) with 5,000 square feet or more with 100 or more average daily vehicle traffic. The threshold criteria that trigger the WQMP requirement for nonresidential commercial/industrial construction projects have been reduced from 100,000 square feet to 10,000 square feet or more of impervious surface. The threshold for residential subdivision projects has also been revised from 10 units or more to a threshold of 10,000 square feet or more of impervious surface.

This Order incorporates new project categories and revised thresholds for several categories of New Development and Significant Redevelopment projects that trigger the requirement for a WQMP. The 2008 National Research Council (NRC) report11 indicates that roads and parking lots constitute as much as 70% of total impervious cover in ultra-urban landscape, and as much as 80% of the directly connected impervious cover. Roads tend to capture and export more storm water Pollutants than other impervious covers. As such, roads are included as a priority development category for which WQMPs are required. The NRC report also indicates that there is a direct relationship between impervious cover and the biological condition of downstream receiving waters. The Permittees are required to address HCOC from New Development and Significant Redevelopment projects to minimize downstream impacts. Private New Development and Significant Redevelopment projects incorporating roads typically allow road runoff to be addressed as part of the overall water quality strategy for the larger common plans of development. Permittee streets, roads and highways capital projects have special limitations. For example, the footprint of street, road and highway capital projects is often limited and may have hydraulic constraints due to lack of underground storm drain systems that would otherwise be necessary to hydraulically facilitate treatment of runoff. There are also limitations specified in state and federal design and code specifications that may limit or prohibit BMPs.

Permittees may also be subject to flow diversion liability and limited road maintenance budgets and equipment. Street, road and highway projects that function as part of the MS4 also receive runoff and associated Pollutants from both existing urban areas and other external sources, including adjacent land use activities, aerial deposition, brake pad and tire wear and other sources that may be outside the Co-Permittee’s authority to regulate and/or economic or technological ability to control. These offsite flows can overwhelm Treatment Control BMPs designed to address the footprint (consistent with the typical requirements for a WQMP) of street, road or highway capital projects incorporating curb and gutter as part of its stormwater conveyance function. Despite these limitations, the Regional 11 National Research Council Report (2008), http://www.nap.edu/catalog.php?record_id=12465 January 29, 2010 Final
890
Fact Sheet – Continued Page 40 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) Board finds that Permittee construction of streets, roads and highway capital projects may provide an opportunity to address Pollutant loads from existing urban areas. However, due to the nature of the facilities and projects, it would be unduly burdensome for the Co-Permittees to maintain WQMP documents for transportation projects (in addition to Facility Pollution Prevention Plans and other overlapping requirements of this Order). The Permittees are therefore not required to prepare WQMP documents for street, road and highway capital projects, but instead are required to develop equivalent documents that include site specific consideration utilizing BMP guidance to address street, roads and highway capital project runoff to the MEP.

As public works, streets, roads and highway projects are the only facilities typically captured by the new WQMP category, and these projects typically have unique constraints that make them difficult to address through the WQMP process, a separate set of requirements has been established for addressing this category of development. Roads that are typically constructed as part of a development are typically incorporated into the broader WQMP for the development activity, providing more options for mitigation via the WQMP process.

Consistent with a long term holistic approach to address water quality and Hydromodification impacts resulting from urbanization, this Order requires Permittees to continue to develop tools that facilitate integration, to the extent practicable, of water quality, stream protection, storm water management and reuse strategies with land use planning policies, ordinances, and plans within each jurisdiction. These tools should address cumulative impacts of development on vulnerable streams, preserve or restore, consistent with the MEP standard, the structure and function of streams, and protect surface and groundwater quality. For 303(d) listed waterbodies with Urban Runoff Pollutant sources and without a TMDL, the Permittees are required to provide special protections such as requiring more effective post-construction BMPs focus training programs and develop targeted public outreach that would address the urban source of the Pollutant of Concern.

The Permittees are also required to participate in the TMDL development and implementation.

J. PUBLIC EDUCATION AND OUTREACH;
Federal regulation, 40 CFR 122.26(d)(iv), requires the Permittees to develop a comprehensive storm water management plan with public participation and 40 CFR 122.26(d)(iv)(B)(6) requires the Permittees to engage in outreach activities to facilitate the proper management of Pollutants. Public outreach is an important element of the overall urban Pollution Prevention program. The Permittees have committed to implement a strategic and comprehensive public education program to maintain the integrity of the Receiving Waters and their ability to sustain Beneficial Uses. The Principal Permittee has taken the lead role in the outreach programs and has targeted various groups including businesses, industry, development, utilities, environmental groups, institutions, homeowners, school January 29, 2010 Final
891
Fact Sheet – Continued Page 41 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) children, and the general public. The Permittees have developed a number of educational materials, have established a storm water Pollution Prevention hotline, started an advertising and educational campaign, and distributed public education materials at a number of public events. The Permittees are required to continue these efforts and to expand public participation and education programs.

The Permittees have already developed BMP fact sheets to address sources from residential activities such as auto washing and maintenance activities; use and disposal of pesticides, herbicides, fertilizers and household cleaners; and collection and disposal of pet wastes.

This Order requires the Permittees to annually review their public education and outreach efforts and revise their activities, if necessary, to address public outreach needs fed back from other Urban Runoff program elements. Federal regulation, 40 CFR 122.26(d)(v), requires the Permittees to conduct a program assessment to determine the reduction in Pollutant loadings due to Urban Runoff management programs. Each Permittee is required to implement an assessment program, guided by the CASQA Guidance manual or equivalent alternative, to measure the change in behavior of its target communities to reduce discharge of Pollutants to the MS4 and the environment.

K. PERMITTEE FACILITIES AND ACTIVITIES;
Federal regulation, 40 CFR 122.26(d)(iv)(A), requires the Permittees to ensure that their activities and facilities do not cause or contribute to violations of Water Quality Standards in receiving waters. Education of Permittee planning, inspection, and maintenance staff is critical to ensure that Permittee facilities and activities do not cause or contribute to an exceedance of Receiving Water Quality Standards.

The 2002 MS4 Permit also specified minimum requirements for street sweeping and inspection and maintenance of drainage facilities. The Permittees were also required to develop and distribute BMP fact sheets for various Permittee activities. Permittee as well as contract staff that perform Permittee activities were required to be properly trained. The second and third term MS4 Permits required the Permittees to prepare a Municipal Facilities Strategy (MFS) to ensure that Permittee facilities and activities do not contribute Pollutants to Receiving Waters. The MFS was incorporated into Section 5 of the DAMP during the third term MS4 Permit. Each year, by August 1st, the Permittees are required to review their activities and facilities to determine the need for revisions to Section 5 of the DAMP.

This Order continues and builds upon the requirement of the third term MS4 Permit by requiring Permittees to include structural post-construction BMP information for certain Permittee projects along with the Notice of Termination submitted to the Executive Officer upon completion of the construction activity.

The Notice of Termination must include photographs of the completed project, a location map, and for public works projects subject to a WQMP, structural postJanuary 29, 2010 Final 892
Fact Sheet – Continued Page 42 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) construction BMP location, field verification report and identify long term operation and maintenance responsibility. Permittees are required to develop a database of post-construction BMPs for which the Permittees are responsible and shall reference this database in the LIP.

Program evaluations conducted during the third term MS4 Permit indicated varying degrees of compliance at Permittee facilities and activities. This Order requires each Permittee to inventory its fixed facilities, field operations and MS4 facilities to ensure that Permittee facilities do not cause or contribute to a Pollution or Nuisance in Receiving Waters. These facilities and field operations are to be prioritized for inspection according to threat to water quality.

Fixed Permittee facilities and field operations include, but are not limited to fire training facilities, corporate yards, maintenance and storage yards, animal shelters, water treatment facilities, swimming pools, warehouses, and hazardous materials storage facilities, and recreation facilities. The Permittees are required to include in their LIP procedures and schedules for inspections and maintenance of Permittee facilities and activities. Urban Runoff from other Permittee facilities, such as airports, wastewater treatment plants and landfills, is regulated under the General Industrial Permit.

L. PERMITTEE CONSTRUCTION PROJECTS
The third term MS4 Permit authorized the discharge of storm water from Construction Sites on one acre or more that are under ownership or direct responsibility of the Permittees. The Permittees were required to notify the Executive Officer prior to commencement of construction activities, and to comply with the substantive requirements of the latest Statewide General Construction Activities Storm Water Permit.

Program evaluations conducted during the third term MS4 Permit indicated that some of the Permittees were not submitting or were not aware of the requirement to submit a Notice of Intent and a Notice of Completion for Permittee construction projects.

M. TRAINING PROGRAM FOR STORM WATER MANAGERS, PLANNERS,

INSPECTORS AND MUNICIPAL CONTRACTORS
Education of Permittee planning, inspection, and maintenance staff is important to ensure that land use decisions, local permit approvals and Permittee facilities and activities do not cause or contribute to an exceedance of Receiving Water Quality Standards. During the term of the 2002 MS4 Permit, the Permittees attended training classes specific to major Urban Runoff program elements including New Development/Significant Redevelopment, Construction Site and Industrial Facility inspections, and Permittee activities.

January 29, 2010 Final
893
Fact Sheet – Continued Page 43 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) This Order requires the Permittees, in conjunction with a broader array of MS4 Programs or CASQA, to define the program implementation training needs for Urban Runoff program staff, including contractors, managers and inspectors.

The training curriculum must be designed for Permittee facilities and field operations staff, Permittee inspection staff, Urban Runoff program managers and those involved in the review and approval of WQMPs and CEQA documents, including Permittee contractors. The audits of the Permittees indicated the need for better inter-departmental collaboration and communication in the local Urban Runoff program implementation. This Order requires LIPs to develop and document processes and procedures for coordination between planners, plan reviewers, engineers and inspectors to ensure that appropriate post-construction BMPs are approved, installed, and are operational.

N. NOTIFICATION REQUIREMENTS
Most of the notification requirements that were spread throughout the third term MS4 Permit were consolidated into one section.

O. PROGRAM MANAGEMENT ASSESSMENT/DAMP REVIEW
The DAMP is a management document that needs to be updated with the new requirements of this Order.

P. FISCAL RESOURCES
Each Permittee is expected to exercise its full authority to secure the resources necessary to meet all requirements of this Order. See Section IX for existing funding mechanisms and potential limitations to Permittee funding.

Q. MONITORING AND REPORTING REQUIREMENTS
During the first term MS4 Permit and part of the second term MS4 Permit, the Permittees conducted monitoring of the Urban Runoff flows, Receiving Water quality, and sediment quality. The Santa Ana Phase I NPDES Monitoring Program began in November 1991 with 27 monitoring sites. The program has been reduced in phases to more specifically address Urban Runoff program needs and to redirect monitoring resources to TMDL-related activities. There was a time where samples were collected on a rotational basis with no consistent monitoring from year to year. On April 14, 2003, with the submittal of an Interim Monitoring Program, monitoring at seven core sampling locations (Sampling Stations 040, 316, 318, 364, 702, 707, and 752) was established that provided representative and consistent monitoring results for the Permit Area.

The Riverside County monitoring programs, as well as other monitoring programs nationwide, have shown that there is a high degree of uncertainty in January 29, 2010 Final
894
Fact Sheet – Continued Page 44 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) the quality of Urban Runoff and that there are significant variations in the quality of Urban Runoff spatially and temporally. However, most of the monitoring programs to date have indicated that there are a number of Pollutants in Urban Runoff. A link between Pollutants in Urban Runoff and Beneficial Use Impairments has been established in a few studies.

This Order requires the Permittees identified as TMDL stakeholders in an approved TMDL to continue to comply with applicable TMDL Implementation Plan requirements, including monitoring requirements, and to implement Urban TMDL WLAs through an iterative BMP approach (see Section V.C above).

Wet and Dry Seasons are defined differently by the various monitoring programs included in this Order. The Middle Santa Ana TMDL defines the Wet Season as 31st November 1 through March and the Canyon Lake/Lake Elsinore TMDL monitoring defines it as October 1st through May 31st . The Monitoring and Reporting Program for this Order generally defines the Wet Season as October 1st through May 31st. Monitoring required under this Order is expected to be conducted consistent with the applicable seasonal definitions.

The MSAR Bacterial Indicator TMDL and Canyon Lake/Lake Elsinore Nutrient TMDL requires the Permittees to comply with TMDL Implementation Plan requirements to revise the DAMP to incorporate BMPs in the Permittees Urban Runoff programs. This Order requires the Permittees to evaluate the effectiveness of the BMPs implemented as part of the DAMP in conformance with the TMDL Implementation Plan requirements.

This MS4 monitoring program includes sampling Urban Runoff at a variety of sites located throughout the Permit Area for three storm events per year. Urban Runoff samples will be collected and analyzed for a variety of constituents. In addition to these efforts, the Permittees are reevaluating their overall Urban Runoff monitoring program to determine its effectiveness in meeting the following objectives:

1. Assess rates of mass loading

2. Assess influence of land use on water quality

3. Assess compliance with Water Quality Objectives

4. Assess effectiveness of water quality controls

5. Detect IC/IDs

6. Identify problem areas and/or trends

7. Identify Pollutants of Concern

8. Identify baseline conditions

9. Establish/maintain a water quality database
January 29, 2010 Final
895
Fact Sheet – Continued Page 45 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) To accomplish these goals, the following activities are conducted:

1. Collect water quality data

2. Collect rainfall/runoff data

3. Establish quality assurance/control procedures

4. Conduct data analysis and archiving

5. Install and maintain appropriate equipment

6. Prepare an Annual Report
RCFC&WCD, in its role as Principal Permittee, participates in the SMC and other task forces. The goal of the SMC is to develop the technical information necessary to better understand storm water mechanisms and impacts, and then develop the tools that will effectively and efficiently improve storm water decision-making.

Some of the cooperative monitoring efforts conducted through the SMC and other task forces include Comparative Evaluation of Microbial Source Tracking Techniques, Model Monitoring Program Guidance, Peak Flow Study, and Laboratory Inter-Calibration Studies. Under the auspices of the SMC, SCCWRP prepared “Model Monitoring Program for Municipal Separate Storm Sewer Systems in Southern California”, August 2004 Technical Report No. 419. This report noted, “...the lack of mass emissions stations in the inland counties hampers their ability to estimate the proportional contribution of these inland areas to cumulative loads downstream”. The SMC consists of representatives from the Counties of Ventura, Los Angeles, Orange, San Bernardino, Riverside, and San Diego and the Cities of Long Beach, and Los Angeles, the Los Angeles, Santa Ana and San Diego Regional Boards, the State Board, SCCWRP, Caltrans, and the USEPA. This Order requires the Permittees to continue mass emissions monitoring to determine Pollutant loading.

During the second and third term MS4 Permits, there was an increased focus on watershed management initiatives and coordination among the MS4 permittees in Orange, Riverside and San Bernardino Counties. The MS4 permittees participated in a number of regional monitoring programs and other coordinated program and policy developments, such as the Regional Integrated Freshwater Bioassessment Monitoring Program, and the BMP Effectiveness Assessment. The Principal Permittee continues to be an active participant in the SWQSTF, MSAR Bacterial Indicator TMDL, Canyon Lake/Lake Elsinore (San Jacinto) Nutrient TMDL and the SMC. This Order recommends that the Permittees continue their participation in these types of watershed coordination efforts and provides them with opportunities to use these efforts to comply with applicable requirements of the Permit.

The third term MS4 Permit required the Permittees to initiate bioassessment monitoring. To allow for a holistic approach, this Order requires the Permittees to participate in the Regional Integrated Freshwater Bioassessment Monitoring January 29, 2010 Final
896
Fact Sheet – Continued Page 46 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) Program in lieu of a separate bioassessment monitoring program for the Permit Area.

This Order requires the Permittees to re-evaluate their CMP and submit a revised plan for approval. The revised CMP should integrate the goals and objectives of the Watershed Action Plan and rectify data gaps from previous monitoring efforts.

R. PROVISIONS – Standard Language per NPDES regulations.

S. PERMIT MODIFICATION– Standard Language per NPDES regulations.

T. PERMIT EXPIRATION AND RENEWAL– Standard Language per NPDES regulations.

IX. WATER QUALITY BENEFITS, COST ANALYSIS, AND FISCAL ANALYSIS There are direct and indirect benefits from clean lakes and beaches, clean water, and a clean environment. It is difficult to assign a dollar value to the benefits the public derives from fishable and swimmable waters. In 1972, at the start of the NPDES program, only 1/3 of the U.S. waters were swimmable and fishable. In 2008, more than 2/3 of the U.S. waters met these criteria. In the 1999 “Money” magazine survey of the “Best Places to Live”, clean water and air ranked as two of the most important factors in choosing a place to live. Thus environmental quality has a definite link to property values.

The true magnitude of the Urban Runoff problem is still elusive and any cost estimate for cleaning up Urban Runoff would be premature short of end-of-pipe treatments. For Urban Runoff, end-of-pipe treatments are cost prohibitive and are not generally considered as a technologically feasible option. Over the last decade, the Permittees have attempted to define the problem and implemented BMPs to the MEP to combat the problem.

The costs incurred by the Permittees in implementing these programs and policies can be divided into three broad categories:

A. Shared costs: These are costs that fund activities performed mostly by the Principal Permittee under the Implementation Agreement. These activities include overall storm water program coordination; intergovernmental agreements; representation at the SWQSTF, Regional Board/State Board meetings and other public forums; preparation and submittal of compliance reports and other reports required under the NPDES permits, responding to Water Code Section 13267 requests, budget and other program documentation; coordination of consultant studies, Co-Permittee meetings, and training seminars.

January 29, 2010 Final
897
Fact Sheet – Continued Page 47 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) B. Individual Costs for DAMP Implementation: These are costs incurred by each Permittee for implementing the BMPs (drainage facility inspections for Illicit Connections, drain inlet/catch basin stenciling, public education, etc.) included in the DAMP. A number of programs and policies for Non-Point and Urban Runoff Pollution controls existed prior to the MS4 permit program. However, the DAMP that was developed and implemented in response to the MS4 Permits required additional programs and policies for Urban Runoff Pollution control.

C. Individual Costs of Pre-Existing Programs: These are costs incurred by each Permittee for water Pollution control measures which were already in existence prior to the MS4 permit program. These programs included recycling, litter control, street sweeping, drainage facility maintenance, and emergency spill response.

Historically, the Permittees have employed four distinct funding methods to finance their NPDES Activities. Many Permittees utilize a combination of these funding sources. The different methods include:

A. Santa Ana Watershed Benefit Assessment Area
In 1991, the RCFC&WCD established the Santa Ana Watershed Benefit Assessment Area (SAWBAA) to fund its NPDES activities. Currently, SAWBAA revenues fund both area-wide NPDES program activities and the RCFC&WCD’s individual MS4 permit compliance activities.

B. County Service Area 152
In December 1991, the County of Riverside formed County Service Area 152 (CSA 152) to provide funding for compliance activities associated with its NPDES permit activities. Under the laws that govern CSAs, sub-areas may be established within the overall CSA area with different assessment rates set within each sub-area. The cities of Corona, Moreno Valley, Norco, Riverside, Lake Elsinore and San Jacinto elected to participate in CSA 152.

C. Utility Charge
The City of Hemet funds a portion of its NPDES program activities through a utility charge.

D. General Fund /Other Revenues
Permittees also utilize general fund revenue to finance their NPDES activities.

Several Permittees also report using general fund and other revenue sources (e.g., gas taxes, developer fees, etc.) to fund a portion of their Urban Runoff management activities.

January 29, 2010 Final
898
{Current Economic Conditions
The following information was provided by the Permittees and does not constitute a finding by the Regional Board:

Fact Sheet – Continued Page 48 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) The Annual Report provides the most recent budgets and expenditure projections available for the costs incurred by the Permittees in implementing these programs and policies. The following information, in parenthesis, on the current economic conditions was provided by the Permittees.

Historically, the Permittees have employed several funding methods to finance their MS4 Permit compliance activities. Unfortunately, the mortgage crisis, collapse of the housing market and the economic recession has resulted in the cessation of virtually all development activity and has significantly reduced sales tax revenue in the Santa Ana Region. Property tax revenues have been reduced by the high level of foreclosure activity and reduced property values. Property tax revenues have been further reduced by homeowner requests for reassessments to reflect the reduced property values. The impact of these economic conditions on the Permittees in the Santa Ana Region has been particularly severe. As a result, funds typically provided by these funding methods has been severely reduced, and it is anticipated that this condition will continue for an indefinite period. The funding methods historically used and the effects of the economic situation on the availability of funds through these sources are summarized as follows:
• Santa Ana Watershed Benefit Assessment Area. In 1991, the District established the Santa Ana Watershed Benefit Assessment Area to fund its MS4 Permit compliance activities. Currently, the Benefit Assessment revenues fund the District’s share of the area-wide MS4 Permit program activities and the District’s individual compliance activities as a Permittee. Under the Benefit Assessment each parcel is taxed based on the impervious area of each parcel at a set rate established through Proposition 218. This rate has not been increased since 1991 and increases in revenues have resulted from increases in the number of contributing parcels resulting from New Development. In 2007/08 the Santa Ana Watershed Benefit Assessment generated approximately $2,030,000 in revenue. These revenues are used to fund the District’s compliance activities and the bulk of the administrative costs associated with the District’s duties as Principal Permittee.

Outlook: The District expects at best to maintain, if not see temporary reductions in Benefit Assessment revenues due to the significant number of homes that are not paying property tax due to foreclosure. An increase in the established Benefit Assessment rate to compensate for these reductions would require approval of 2/3 of the voters or 50% of the property owners and is unlikely, especially in the current economic climate. An increase in the number of contributing parcels will not occur until the development industry recovers.

January 29, 2010 Final
899
Fact Sheet – Continued Page 49 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) • General Fund/Other Revenues. The County and the Cities utilize general fund revenue to finance most of their MS4 Permit compliance activities. General fund revenue is generated by property tax, sales tax, and auto license taxes.

Outlook: The Permittees expect a continued reduction in the funds available through General Fund/Other Revenues through at least FY 2010/2011.

Historically, the Permittees have investigated other funding sources, including a phone survey conducted by LESJWA with support from the District and the County of Riverside to evaluate the possibility of passing a new assessment to fund water quality improvements benefiting Lake Elsinore. The results of the survey found insufficient voter support for water quality-related issues to move forward with a special election. The Permittees have also formed a finance committee which has met several times to obtain information about actions that they can take to maximize revenues and potential alternative funding sources.

These efforts met with some success, particularly in relation to maximizing fees for service; however significant new funding sources were not identified or available to the Permittees even during the more favorable economic conditions experienced during the term of the 2002 Riverside County MS4 Permit. • Fees. Several Permittees charge fees for services such as inspections, plan check and other recoverable costs related to compliance with the 2002 Riverside County MS4 Permit. These fees cover both the direct and indirect costs associated with conducting these inspections/reviews including associated compliance tracking and reporting.

Outlook: It is notable that, with the virtual collapse of the development industry in the Santa Ana Region, the fees received by the Permittees for review of New Developments and Construction Site inspections have been significantly reduced. With this reduced level of fee-based income, maintenance of the existing inspection and plan review programs will place a burden on overall funding of the compliance programs. The Permittees do not expect revenues from fees to recover until the development industry recovers. Even with recovery of the development industry, it is anticipated that revenues from fees will be reduced for the majority of the Cities within the Santa Ana Region and the County due to the reduced area remaining for development in their jurisdictions.
• Grants. The Permittees have actively pursued and, as available, used grants to fund compliance programs.

Outlook: In December the State's budget crisis resulted in a directive to State agencies from the Department of Finance to halt projects that rely on bond funds, including those funded by Proposition 40, Proposition 50 or Proposition

84. The State of California is the primary source of grant funding for water January 29, 2010 Final
900
Fact Sheet – Continued Page 50 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) quality projects. Future availability of funds to resume compliance projects funded by grants is uncertain.

It is clear that the current economic climate and that of the foreseeable future is creating a significant burden upon the Permittees that will make the continuance of all existing MS4 Permit compliance programs difficult. If new funding sources or alternative combinations of funding sources cannot be identified, it is likely that compliance program funding will be further impacted.

Economic Projections
According to Chicago Title, Southwest Riverside County has experienced a very significant increase in supply of single-family residential units on the market. As a result, housing price indicators are very negative. In the majority of the Southwest Riverside submarket, the pending price is less than closing price that suggests the weakness of the market. The October 2008 count of bank owned (REO) properties for Riverside County as a whole was 12,078. The number of foreclosures was 23,480. The presence of high levels of REO properties will continue to negatively affect the price line. In addition, the level of foreclosures is increasing. At the end of January 2009, 68% of the homes listed for sale are foreclosures or short sales12 .

With regard to other sectors of the economy, Riverside County has taken a serious turn for the worse in 2008, with projections indicating that the severe downturn will continue through 2009 at the very least. The economic difficulties being faced in the Southwest Riverside submarket is the result of the dramatic downturn in the housing market in this area, the national financial turmoil, the worldwide credit crisis, and the increasing consumer debt crisis. According to Beacon Economics, a respected economics consulting firm in Los Angeles, Inland Southern California is clearly at the epicenter of this economic turmoil, with extremely high rates of unemployment at present. Unemployment rates in Inland Southern California are expected to reach 12.4% (Riverside County beat that – unemployment was 14.6% in November 2009 – California Employment Development Department) before this deep recession is over. Housing prices are expected to continue their precipitous decline from their peak levels in the two Inland Southern California counties through at least 2011. According to Dataquick, median home prices in Riverside County peaked at $415,000 in January 2007. At the end of this cycle, the median home price in Riverside County is expected to be $198,000. Figure 1 depicts the median housing price in Riverside County over the period 1990 to August 2008. 12 Orange County Register, January 27, 2009, p. 11.

January 29, 2010 Final
901
Fact Sheet – Continued Page 51 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) Figure 1. Riverside County Median Housing Price (1990 – August 2008) Source: Riverside County Center for Demographic Research. 2008. Riverside County Progress Report, pg 14.

Local Government sales tax revenues remained fairly stagnant through 2006 and began to decline in early 2007, according to Beacon. By the second quarter of 2008, the taxable sales in Riverside County declined by 7.7%. This will continue with taxable sales possibly bottoming out by 2010. These shocks are expected to continue and accelerate within the southwest Riverside County economy.

As a direct outcome of the current economy and the economic outlook into the term of the 2009 Riverside County MS4 Permit, the number of New Development proposals has plummeted and any significant rebound is not forecast. New and redevelopment projects will likely remain minimal. As shown in Figure 2, the number of housing units being added each year has dropped below the levels seen at any point in time during the 2002 Riverside County MS4 Permit. These numbers will likely continue to decrease for a significant portion of the new 2010 Riverside County MS4 Permit term.

January 29, 2010 Final
902
Fact Sheet – Continued Page 52 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) Figure 2. Riverside County Housing Units Added (1990 – 2008) Source: Riverside County Center for Demographic Research. 2008. Riverside County Progress Report, pg 12.

These economic issues and projections directly affect and limit both:
• The need for including enhanced New Development and Significant Redevelopment requirements in the 2010 Riverside County MS4 Permit, and • The Permittees ability to fund, and even seek new funding sources for additional MS4 Permit requirements for New Development and Significant Redevelopment projects.

Permittee specific projections are as follows:

County of Riverside
The County is operating with a structural deficit of $12 million and plans a 25% budget reduction from FY 2008/2009 through FY 2011/2012. The County’s current budget of $4.7 billion represents a 5% reduction from the previous year and next year’s budget is expected to be cut by 10%. These cuts are directly associated with the decline in property values caused by the high number of foreclosures. There are concerns about having to use discretionary funds to meet State mental health and social service mandates. In addition, the County is dependent on funds from Federal and State sources. If during this time of economic crisis Federal and State funding sources are reduced or eliminated, any unfunded programs will be terminated. Only core County programs will continue.

January 29, 2010 Final
903
Fact Sheet – Continued Page 53 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) The primary source of general fund revenue is from property taxes and sales tax. With the unprecedented number of foreclosures, reduced property values, and declining sales, general fund revenue is in a downward spiral.

Another source of funding is through the Solid Waste Tipping Fees paid at the County landfills. Volume is down 15% since 2006 with anticipated downward trend to 40% reduction in solid waste through 2014. Programs that are partially funded through tipping fee allotments will be impacted. Due to the declining economy the recycling market has collapsed. Virtually no recyclable materials are being shipped for reprocessing. This loss of revenue and increased disposal costs is further impacting the general fund.

Cuts of 25% for all Net County Cost general fund programs will translate into reduction of County services and elimination of unfunded State and Federal programs. Only core value programs will be provided (including public safety and fee programs).

The County has instituted a hiring freeze and required each department to create a report outlining the projected effects of the budget cuts. The County currently employs over 20,000 people, and layoffs are expected to result from the findings of these departmental reports. It is anticipated that this will impact program delivery for stormwater related activities. No County department will be able to sustain current staffing levels as they try to meet the 25% budget reduction strategy. 13 14
City of Menifee
The newly incorporated City of Menifee FY 2008/2009 initial budget was estimated from their comprehensive fiscal analysis that was submitted to the Local Agency Formation Commission during the incorporation process.

Because of the economic uncertainty, and the fact that the City is only now beginning to staff positions, it is unknown what the immediate impact of the fiscal crisis will be. The County is responsible for assisting the City in meeting its MS4 Permit compliance requirements during the first year of incorporation which expires October 1, 2009. Currently, the level of property tax revenue that will be available to the City is uncertain. Funding for MS4 Permit compliance requirements was not explicitly budgeted. A financial hardship currently exists because of the costs associated with incorporation.

City of Murrieta
The City of Murrieta’s FY 2008/2009 budget did not increase compared to FY 2007/2008. The City has identified a $3.3 million budget shortfall for the current fiscal year ending on June 30, 2009. This represents approximately

8.2% of the City’s projected revenue which must be absorbed in five months. 13 “The Realities of Recession in California: A Statewide Report by U.S. Senator Barbara Boxer, December, 2008, p. 18.
14 Riverside County Executive Office, January, 2008.

January 29, 2010 Final
904
Fact Sheet – Continued Page 54 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) The shortfalls are primarily due to reduced sales tax and property tax revenues. Department heads are currently working on revised budgets to adjust for the loss in revenue.

Additional, budget cuts are anticipated for FY 2009/2010 because the immediate economic outlook is not good. There have been approximately 2,000 home foreclosures within the City. Sales tax revenue is estimated to drop 12.5%, property tax revenue will drop, and the State took approximately $525,000 out of redevelopment funds. Murrieta did not receive any vehicle licensing fees from the State and it appears likely that the State will take more revenue from the cities to solve its budget problems. New NPDES requirements that increase compliance costs will create a financial hardship for the City.

City of Riverside
The City of Riverside has seen declining general fund revenue over the last two fiscal years in virtually all categories. The City's most recent projection indicates that total general fund revenues for the current fiscal year will be under $200 million, down from a budget of $215 million as adopted, and $226.5 million in the prior fiscal year. This represents a decline over two fiscal years of approximately 12%. Specifically, property tax and sales tax revenue continue their decline, which is primarily attributable to decreased residential construction activity and in the case of sales tax declining automobile sales.

The decline in revenue has resulted in a corresponding reduction to general fund expenditures. Specifically, approximately 12% of the positions authorized for the general fund have been vacated and unfunded, either through transferring staff to other funds, attrition or limited layoffs of temporary and contract staff. Additionally, the level of service provided to the community in virtually all City departments has been reduced through funding reductions to items such as street maintenance, recreation programs and libraries, though great care has been taken to minimize the impact of cuts to the public.

It is anticipated that in the near term the economic situation will not improve, and staff is preparing a budget for the upcoming fiscal year that anticipates further decreases in revenue.

City of Wildomar
The newly incorporated City of Wildomar FY 2008/2009 initial budget was estimated from their comprehensive fiscal analysis that was submitted to the Local Agency Formation Commission during the incorporation process.

Because of the economic uncertainty, and the fact that the City is only now beginning to staff positions, it is unknown what the immediate impact of the fiscal crisis will be. The County is responsible for assisting the City in meeting its MS4 Permit compliance requirements the first year of incorporation that expires July 1, 2009. Currently, the level of property tax revenue that will be January 29, 2010 Final
905
Fact Sheet – Continued Page 55 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) available to the City is uncertain. Funding for MS4 Permit compliance requirements was not explicitly budgeted. A financial hardship currently exists because of the costs associated with incorporation.}
X. ANTIDEGRADATION ANALYSIS
The Regional Board has considered whether a complete antidegradation analysis, pursuant to 40 CFR 131.12 and State Board Resolution No. 68-16, is required for these Urban Runoff discharges. The Regional Board finds that the Pollutant loading rates to the Receiving Waters will be reduced with the implementation of the requirements in this Order. As a result, the quality of Urban Runoff discharges and Receiving Waters will be improved, thereby improving protection for the Beneficial Uses of Waters of the U.S.. Since this Order will not result in a lowering of water quality, a complete antidegradation analysis is not necessary, consistent with the federal and state antidegradation requirements.

XI. ANTI-BACKSLIDING
Sections 402(o)(2) and 303(d)(4) of the CWA and federal regulations at 40 CFR 122.44(l) prohibit backsliding in NPDES permits. These anti-backsliding provisions require Effluent Limitations in a reissued NPDES permit to be as stringent as those in the previous permit, with some exceptions where Effluent Limitations may be relaxed.

All Effluent Limitations in this Order are at least as stringent as the Effluent Limitations in the 2002 Order.

XII. PUBLIC WORKSHOP AND PUBLIC HEARING
Regional Board conducted a public workshop regarding the proposed Order on August 3, 2009 at the City of Loma Linda, Council Chambers, 25541 Barton Road, Loma Linda, CA. Based on the comments received, a second draft was released for public review and comments on October 22, 2009. The third draft, issued on December 15, 2009, will be considered for adoption at a public hearing as follows:

Date and time: January 29, 2010; meeting starts at 9:00 a.m.

Location: City of Loma Linda, Council Chambers
25541 Barton Road
Loma Linda, CA
A Notice of Public Hearing and Hearing Procedure is posted on the Regional Board’s website indicated below. An agenda for the public hearing to consider adoption of the proposed Order will be posted on the Regional Board’s website approximately 10 days prior to the meeting date at:
http://www.waterboards.ca.gov/santaana/water_issues/programs/stormwater/riverside_permit.shtml January 29, 2010 Final
906
Fact Sheet – Continued Page 56 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) This information may be also obtained by calling the Regional Board office at 951-782- 4130.

The Regional Board recognizes the significance of Riverside County's Storm Water/Clean Water Protection Program and will conduct, participate, and/or assist with any workshop during the term of this Order to promote and discuss the requirements of this Order and the progress of the Urban Runoff management program. The details of the public workshops will be posted on the Regional Board’s website indicated above.

Persons wishing to be included in the mailing list for any of the items related to this permit may register their name, mailing address and phone number with the Regional Board office at the address given below.

XIII. PUBLIC HEARING
The Regional Board will hold a public hearing regarding the proposed waste discharge requirements. A Notice of Public Hearing was published in the Legal Notices section of the Press Enterprise, a local newspaper, on November 13, 2009. The public hearing on this item is scheduled as indicated above in Section XI. Additional information regarding the public hearing will also be posted on the website indicated above.

Further information regarding the conduct and nature of the public hearing concerning these waste discharge requirements may be obtained by writing or visiting the Santa Ana Regional Board office, 3737 Main Street, Suite 500, Riverside, CA 92501. This and other information are also available at the website at:
www.waterboards.ca.gov/santaana.

XIV. INFORMATION AND COPYING
Persons wishing further information may write to the above address or call Keith Elliott at (951) 782-4925. Copies of the application, proposed waste discharge requirements, and other documents (other than those which the Executive Officer maintains as confidential) are available at the Regional Board office for inspection and copying by appointment scheduled between the hours of 8:30 a.m. and 4:00 p.m., Monday through Friday (excluding holidays, and furlough days).

XV. REGISTER OF INTERESTED PERSONS
Any person interested in a particular application or group for applications may leave his name, address and phone number as part of the file for an application. Copies of tentative waste discharge requirements will be available on the web for all interested parties to download.

E-mail registration:
http://www.waterboards.ca.gov/resources/email_subscriptions/reg8_subscribe.shtml January 29, 2010 Final
907
Fact Sheet – Continued Page 57 of 57
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Riverside County Urban Runoff Management Program (MS4 Permit) XVI. RECOMMENDATION
Staff recommendation is to adopt the tentative Order, Order No. R8-2010-0033, as presented.

January 29, 2010 Final
908
Order No. R8-2010-0033 (NPDES No. CAS 618033)
Area-wide Urban Runoff
RCFC&WCD, the County of Riverside, and the Incorporated Cities APPENDIX 7

NOTICE OF INTENT AND

NOTICE OF TERMINATION

FOR DE-MINIMUS DISCHARGES
909

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD

SANTA ANA REGION

NOTICE OF INTENT

TO COMPLY WITH THE TERMS AND CONDITIONS OF THE
Riverside County MS4 Permit
ORDER NO. R8-2010-0033
NPDES NO. CAS 618033
San Bernardino County MS4 Permit
ORDER NO.R8-2010-0036
NPDES NO. CAS618036

GENERAL WASTE DISCHARGE REQUIREMENTS FOR DISCHARGE TO

SURFACE WATERS

THAT POSE INSIGNIFICANT (DE MINIMUS) THREAT TO WATER QUALITY I. PERMITTEE (Person/Agency Responsible for the Discharge) Agency/Company
Name:_______________________________________________________________________ _________________________________________________________________ _____________ _____________ _______ : ___________________ : (______) ______________ _____________________
_______________________________________________________________________ _________________________________________________________________ _____________ _____________ _______ :____________________ (______) ______________ _____________________
:_________________,
________________________
__________________ ________________________
_____________
_____________________________________________________
____________________________________________T _______________________ _________________________________________ __________________ ____________________________________________
Address/Street
City State ZIP Contact Person
Phone ; Email:

II. FACILITY
Name:

Address/Street
City State ZIP Contact Person
Phone: ; Email:
a. Projected Flow Rate (gpd)
b. Receiving Water (identify):

III. INDICATE EXISTING PERMIT NUMBER: (if applicable)
a. Individual Permit Order No. NPDES No.
b. General Permit Order No. R8-2010-003-
c. Others (specify)
IV. CERTIFICATION:

I certify under penalty of law that I am an authorized representative of the permittee and that I have personally examined and am familiar with the information submitted in this application and all attachments and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in the application, I believe the information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. In addition, I certify that the permittee will comply with the terms and conditions stipulated in Orders No. R8-2009-0003 and (R8-2010-0033 or R8-2010-0036, as applicable) including the monitoring and reporting program issued by the Executive Officer of the Regional Board.

Name:
(type or print)
itle:

Signature: Date:

Email:

Remarks: If changes to facility ownership and/or treatment processes were made after the issuance of the existing permit, please provide a description of such changes on another sheet and submit it with this Notice of Intent.
910
- 2 -
V. OTHER REQUIRED INFORMATION - FOR NEW DISCHARGERS AND FOR NEW

DISCHARGES AND LOCATIONS NOT PREVIOUSLY REPORTED BY EXISTING DISCHARGERS.

Please provide a COMPLETE characterization of your discharge. A complete characterization includes, but is not limited to:
a. A list of constituents and the discharge concentration of each constituent; b. The estimated average and maximum daily flow rates at unit of gallons per day(gpd); the frequency and duration of the discharge and the date(s) when discharge will start; c. The proposed discharge location(s) as latitude and longitude for each discharge point; d. A description of the proposed treatment system (if appropriate); e. The affected receiving water; the receiving water(s) shall be 1) receiving storm drain/creek, and/or
2) the ultimate receiving water, such as Santa Ana River, San Jacinto River, Lake Elsinore, Prado Park Lake, etc.;
f. A map showing the path from the point of initial discharge to the ultimate receiving water.

Please try to limit your maps to size of 8.5” X 11”.
g. A list of known or suspected leaking underground tanks and other facilities or operations that have, or may have impacted the quality of the underlying groundwater within 200 feet of the site property lines for projects with expected discharge flow rates of less than 100,000 gallons per day and within 500 feet of the site property lines for projects with expected discharge flow rates of greater than 100,000 gallons per day.
h. Any other information deemed necessary by the Executive Officer.

VI. OTHER
Attach additional sheets to explain any responses which need clarification. List attachments with titles and dates below:

You will be notified by a representative of the RWQCB within 30 days of receipt of your application. The notice will state if your application is complete or if there is additional information you must submit to complete your application, pursuant to Division 7, Section 13260 of the California Water Code.
911
1 STATE WATER RESOURCES CONTROL BOARD
1001 I Street, Sacramento, California 95814
ORDER WQ 2022-0103-DWQ

STATEWIDE WASTE DISCHARGE REQUIREMENTS

GENERAL ORDER FOR SANITARY SEWER SYSTEMS
This Order was adopted by the State Water Resources Control Board on December 6, 2022.

This Order shall become effective 180 days after the Adoption Date of this General Order, on June 5, 2023.

The Enrollee shall comply with the requirements of this Order upon the Effective Date of this General Order.

This General Order does not convey any property rights of any sort or any exclusive privileges.

The requirements prescribed herein do not authorize the commission of any act causing injury to persons or property, protect the Enrollee from liability under federal, state, or local laws, nor create a vested right for the Enrollee to continue the discharge of waste.

CERTIFICATION
I, Jeanine Townsend, Clerk to the Board, do hereby certify that this Order with all attachments is a full, true, and correct copy of the Order adopted by the State Water Board on December 6, 2022.

AYE: Chair E. Joaquin Esquivel
Vice Chair Dorene D’Adamo
Board Member Sean Maguire
Board Member Laurel Firestone
Board Member Nichole Morgan
NAY: None
ABSENT: None
ABSTAIN: None
for
Jeanine Townsend
Clerk to the Board
912

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
2 Table of Contents

1. Introduction .................................................................................................................... 4

2. Regulatory Coverage and Application Requirements .................................................... 5

2.1. Requirements for Continuation of Existing Regulatory Coverage ....................... 5

2.2. Requirements for New Regulatory Coverage...................................................... 5

2.3. Regulatory Coverage Transfer............................................................................ 7

3. Findings ......................................................................................................................... 7

3.1. Legal Authorities ................................................................................................. 7

3.2. General ............................................................................................................. 11

3.3. Water Quality Control Plans, Policies and Resolutions ..................................... 14

3.4. California Environmental Quality Act................................................................. 16

3.5. State Water Board Funding Assistance for Compliance with Water Board Water Quality Orders ................................................................................................... 16

3.6. Notification to Interested Parties ....................................................................... 17

4. Prohibitions .................................................................................................................. 17

4.1 Discharge of Sewage from a Sanitary Sewer System....................................... 17

4.2. Discharge of Sewage to Waters of the State..................................................... 17

4.3. Discharge of Sewage Creating a Nuisance....................................................... 18

5. Specifications............................................................................................................... 18

5.1. Designation of a Legally Responsible Official ................................................... 18

5.2. Sewer System Management Plan Development and Implementation............... 18

5.3. Certification of Sewer System Management Plan and Plan Updates................ 19

5.4. Sewer System Management Plan Audits .......................................................... 19

5.5. Six-Year Sewer System Management Plan Update.......................................... 21

5.6. System Resilience............................................................................................. 22

5.7. Allocation of Resources .................................................................................... 22

5.8. Designation of Data Submitters......................................................................... 22

5.9. Reporting Certification....................................................................................... 22

5.10. System Capacity ............................................................................................... 23

5.11. System Performance Analysis .......................................................................... 23

5.12. Spill Emergency Response Plan and Remedial Actions ................................... 23

5.13. Notification, Monitoring, Reporting and Recordkeeping Requirements ............. 24

5.14. Electronic Sanitary Sewer System Service Area Boundary Map....................... 26

5.15. Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems ................................................................................... 26

5.16. Voluntary Notification of Spills from Privately-Owned Laterals and/or Systems to the California Office of Emergency Services ..................................................... 27

5.17. Unintended Failure to Report ............................................................................ 27 913

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
3 5.18. Duty to Report to Water Boards ........................................................................ 27

5.19. Operation and Maintenance............................................................................... 27

6. Provisions .................................................................................................................... 27

6.1. Enforcement Provisions .................................................................................... 27

6.2. Other Regional Water Board Orders ................................................................. 30

6.3. Sewer System Management Plan Availability ................................................... 31

6.4. Entry and Inspection ......................................................................................... 31 Table of Attachments
Attachment A – Definitions .....................................................................................................A-1 Attachment B – Application for Enrollment .............................................................................B-1 Attachment C - Notice of Termination.....................................................................................C-1 Attachment D – Sewer System Management Plan – Required Elements ..............................D-1 Attachment E1 – Notification, Monitoring, Reporting and Recordkeeping Requirements .....E1-1 Attachment E2 – Summary of Notification, Monitoring and Reporting Requirements...........E2-1 Attachment F – Regional Water Quality Control Board Contact Information ..........................F-1 914

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
4 1. INTRODUCTION
This General Order regulates sanitary sewer systems designed to convey sewage. For the purpose of this Order, a sanitary sewer system includes, but is not limited to, pipes, valves, pump stations, manholes, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks. A sanitary sewer system includes:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.

Sewage is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

Sewage contains high levels of suspended solids, non-digested organic waste, pathogenic bacteria, viruses, toxic pollutants, nutrients, oxygen-demanding organic compounds, oils, grease, pharmaceuticals, and other harmful pollutants.

For the purpose of this General Order, a spill is a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Sewage and its associated wastewater spilled from a sanitary sewer system may threaten public health, beneficial uses of waters of the State, and the environment.

This General Order serves as statewide waste discharge requirements and supersedes the previous State Water Resources Control Board (State Water Board) Order 2006-0003-DWQ and amendments thereafter. All sections and attachments of this General Order are enforceable by the State Water Board and Regional Water Quality Control Boards (Regional Water Boards). Through this General Order, the State Water Board requires an Enrollee to:
• Comply with federal and state prohibitions of discharge of sewage to waters of the State, including federal waters of the United States;
• Comply with specifications, and notification, monitoring, reporting and recordkeeping requirements in this General Order that implement the federal Clean Water Act, the California Water Code (Water Code), water quality control plans (including Regional Water Board Basin Plans) and policies;
• Proactively operate and maintain resilient sanitary sewer systems to prevent spills; • Eliminate discharges of sewage to waters of the State through effective implementation of a Sewer System Management Plan;
• Monitor, track, and analyze spills for ongoing system-specific performance improvements; and
• Report noncompliance with this General Order per reporting requirements. 915

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
5 An Enrollee is a public, private, or other non-governmental entity that has obtained approval for regulatory coverage under this General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
o greater than one (1) mile in length (each individual sanitary sewer system); o one (1) mile or less in length where the State Water Board or a Regional Water Board requires regulatory coverage under this Order; or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Board or a Regional Water Board requires regulatory coverage under this Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.

For the purpose of this Order, a sanitary sewer system includes only systems owned and/or operated by the Enrollee.

2. REGULATORY COVERAGE AND APPLICATION REQUIREMENTS

2.1. Requirements for Continuation of Existing Regulatory Coverage To continue regulatory coverage from previous Order 2006-0003-DWQ under this General Order, within the 60-days-prior-to the Effective Date of this General Order, the Legally Responsible Official of an existing Enrollee shall electronically certify the Continuation of Existing Regulatory Coverage form in the online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database. The Legally Responsible Official will receive an automated CIWQS-issued Notice of Applicability email, confirming continuation of regulatory coverage under this General Order. All regulatory coverage under previous Order 2006-0003-DWQ will cease on the Effective Date of this Order.

An Enrollee continuing existing regulatory coverage is not required to submit a new application package or pay an application fee for enrollment under this General Order.

The annual fee due date for continued regulatory coverage from previous Order 2006-0003-DWQ to this General Order remains unchanged.

A previous Enrollee of Order 2006-0003-DWQ that fails to certify the Continuation of Existing Regulatory Coverage form in the online CIWQS database by the Effective Date of this Order is considered a New Applicant, and will not have regulatory coverage for its sanitary sewer system(s) until:
• A new application package for system(s) enrollment is submitted per section 2.2 (Requirements for New Regulatory Coverage) below; and
• The new application package is approved per section 2.2.2 (Approval of Application Package (For New Applicants Only)).

2.2. Requirements for New Regulatory Coverage
No later than 60 days prior to commencing and/or assuming operation and maintenance responsibilities of a sanitary sewer system, a duly authorized representative that 916

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
6 maintains legal authority over the public or private sanitary sewer system is required to enroll under this General Order by submitting a complete application package as specified below and as provided in Attachment B (Application for Enrollment Form) of this General Order.

Unless required by a Regional Water Board, a public agency that owns a combined sewer system subject to the Combined Sewer Overflow Control Policy (33 U.S. Code § 1342(q)), is not required to enroll, under this Order, the portions of its sanitary sewer system(s) that collects combined sanitary wastewater and stormwater.

2.2.1. Application Package Requirements
The Application for Enrollment package for new applicants must include the following items:
• Application for Enrollment Form. The form in Attachment B of this General Order must be completed, signed, and certified by a Legally Responsible Official, in accordance with section 5.1 (Designation of a Legally Responsible Official) of this General Order. If an electronic Application for Enrollment form is available at the time of application, a new applicant shall submit its application form electronically; and
• Application Fee. A fee payable to the “State Water Resources Control Board” in accordance with the Fee Schedule in the California Code of Regulations, Title 23, section 2200, or subsequent fee regulations updates.

The application fee for this General Order is based on the sanitary sewer system’s threat to water quality and complexity designations of category 2C or 3C, which is assigned based on the population served by the system. The current Fee Schedule for sanitary sewer systems is listed under subdivision (a)(2) at the following website:

Fee Schedule (https://www.waterboards.ca.gov/resources/fees/water_quality/).

2.2.2. Approval of Application Package (For New Applicants Only) The Deputy Director of the State Water Board, Division of Water Quality (Deputy Director) will consider approval of each complete Application for Enrollment package.

The Deputy Director will issue a Notice of Applicability letter which serves as approved regulatory coverage for the new Enrollee.

If the submitted application package is not complete in accordance with section 2.2.1 (Application Package Requirements) of this General Order, the Deputy Director will send a response letter to the applicant outlining the application deficiencies. The applicant will have 60 days from the date of the response letter to correct the application deficiencies and submit the identified items necessary to complete the application package to the State Water Board.

2.2.3. Electronic Reporting Account for New Enrollee
Within 30 days after the date of the Approval of Complete Application Package for System Enrollment, a duly authorized representative for the Enrollee shall obtain a CIWQS Sanitary Sewer System Database user account by clicking the “User Registration” button and following the directions on the CIWQS Login Page 917

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
7 (https://ciwqs.waterboards.ca.gov). If additional assistance is needed to establish an online CIWQS user account, contact State Water Board staff by email at [email protected]. The online user account will provide the Enrollee secure access to the online CIWQS database for electronic reporting.

2.3. Regulatory Coverage Transfer
Regulatory coverage under this General Order is not transferable to any person or party except after an existing Enrollee submits a written request for a regulatory coverage transfer to the Deputy Director, at least 60 days in advance of any proposed system ownership transfer. The written request must include a written agreement between the existing Enrollee and the new Enrollee containing:
• Acknowledgement that the transfer of ownership is solely of an existing system with an existing waste discharge identification (WDID) number; • The specific ownership transfer date in which the responsibility and regulatory coverage transfer between the existing Enrollee and the new Enrollee becomes effective; and
• Acknowledgement that the existing Enrollee is liable for violations occurring up to the ownership transfer date and that the new Enrollee is liable for violations occurring on and after the ownership transfer date.

The Deputy Director will consider approval of the written request. If approved, the Deputy Director will issue a Notice of Applicability letter which serves as an approved transfer of regulatory coverage to the new Enrollee.

3. FINDINGS

3.1. Legal Authorities

3.1.1. Federal and State Regulatory Authority
The objective of the Clean Water Act is to restore and maintain the chemical, physical, and biological integrity of the waters of the United States (33 U.S.C. 1251). The Water Code authorizes the State Water Board to implement the Clean Water Act in the State and to protect the quality of all waters of the State (Water Code sections 13000 and 13160).

3.1.2. Discharge of Sewage
A discharge of untreated or partially treated sewage is a discharge of waste as defined in Water Code section 13050(d) that could affect the quality of waters of the State and is subject to regulation by waste discharge requirements issued pursuant to Water Code section 13263 and Chapter 9, Division 3, Title 23 of the California Code of Regulations.

A discharge of sewage may pollute and alter the quality of the waters of the State to a degree that unreasonably affects the beneficial uses of the receiving water body or facilities that serve those beneficial uses (Water Code section 13050(l)(1)). 918

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
8 3.1.3 Water Boards Authority to Require Technical Reports, Monitoring, and Reporting Water Code sections 13267 and 13383 authorize the Regional Water Boards and the State Water Board to establish monitoring, inspection, entry, reporting, and recordkeeping requirements. Water Code section 13267(b), authorizes the Regional Water Boards to “require any person who has discharged, discharges, or is suspected of having discharged or discharging, or who proposes to discharge waste within its region… or is suspected of having discharged or discharging, or who proposes to discharge, waste outside of its region that could affect the quality of water within its region shall furnish, under penalty of perjury, technical or monitoring reports which the regional board requires…In requiring those reports, the regional board shall provide the person with a written explanation with regard to the need for the reports and shall identify the evidence that supports requiring that person to provide the reports.” Water Code section 13267(f) authorizes the State Water Board to require this information if it consults with the Regional Water Boards and determines that it will not duplicate the efforts of the Regional Water Boards. The State Water Board has consulted with the Regional Water Boards and made this determination.

The technical and monitoring reports required by this General Order and Attachment E (Notification, Monitoring, Reporting and Recordkeeping Requirements) are necessary to evaluate and ensure compliance with this General Order. The effort to develop required technical reports will vary depending on the system size and complexity and the needs of the specific technical report. The burden and cost of these reports are reasonable and consistent with the interest of the state in protecting water quality, which is the primary purpose of requiring the reports.

Water Code section 13383(a) authorizes the Water Boards to “establish monitoring, inspection, entry, reporting, and recordkeeping requirements… for any person who discharges, or proposes to discharge, to navigable waters, any person who introduces pollutants into a publicly owned treatment works, any person who owns or operates, or proposes to own or operate, a publicly owned treatment works or other treatment works treating domestic sewage, or any person who uses or disposes, or proposes to use or dispose, of sewage sludge.” Section 13383(b) continues, “the state board or the regional boards may require any person subject to this section to establish and maintain monitoring equipment or methods, including, where appropriate, biological monitoring methods, sample effluent as prescribed, and provide other information as may be reasonably required.”
Reporting of spills from privately owned sewer laterals and systems pursuant to section

5.15 (Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems) of this General Order is authorized by Water Code section 13225(c) and encouraged by the State Water Board, wherein a local agency may investigate and report on any technical factors involved in water quality control provided the burden including costs of such reports bears a reasonable relationship to the need for the report and the benefits to be obtained therefrom. The burden of reporting private spills under section 5.15 (Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems) is minimal and is outweighed by the benefit of providing Regional Water Boards an opportunity to respond to these spills 919

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
9 when an Enrollee, which in many cases has a contractual relationship with the owner of the private system, has knowledge of the spills.

3.1.4. Water Board Authority to Prescribe General Waste Discharge Requirements Water Code section 13263(i) provides that the State Water Board may prescribe general waste discharge requirements for a category of discharges if the State Water Board finds or determines that:
• The discharges are produced by the same or similar operations; • The discharges involve the same or similar types of waste; • The discharges require the same or similar treatment standards; and • The discharges are more appropriately regulated under general waste discharge requirements than individual waste discharge requirements.

Since 2006, the State Water Board has been regulating over 1,100 publicly owned sanitary sewer systems (See section 3.1.5 (Previous Statewide General Waste Discharge Requirements) of this General Order). California also has a large unknown number of unregulated privately owned sanitary sewer systems. All waste conveyed in publicly owned and privately owned sanitary sewer systems (as defined in this General Order) is comprised of untreated or partially treated domestic waste and/or industrial waste. Generally, sanitary sewer systems are designed and operated to convey waste by gravity or under pressure; system-specific design elements and system-specific operations do not change the common nature of the waste, the common threat to public health, or the common impacts on water quality. Spills of waste from a sanitary sewer system prior to reaching the ultimate downstream treatment facility are unauthorized and enforceable by the State Water Board and/or a Regional Water Board. Therefore, spills from sanitary sewer systems are more appropriately regulated under general waste discharge requirements.

As specified in Water Code sections 13263(a) and 13241, the implementation of requirements set forth in this Order is for the reasonable protection of past, present, and probable future beneficial uses of water and the prevention of nuisance. The requirements implement the water quality control plans (Basin Plans) for each Regional Water Board and take into account the environmental characteristics of sewer service areas and hydrographic units within the state. Additionally, the State Water Board has considered water quality conditions that could reasonably be achieved through the coordinated control of all factors that affect water quality, costs associated with compliance with these requirements, the need for developing housing within California, and the need to protect sources of drinking water and other water supplies.

3.1.5. Previous Statewide General Waste Discharge Requirements On May 2, 2006, the State Water Board adopted Order 2006-0003-DWQ serving as Waste Discharge Requirements pursuant to Article 4, Chapter 4, Division 7 of the Water Code (commencing with section 13260) for inadvertent discharges to waters of the State. Order 2006-0003-DWQ prohibited discharges of untreated or partially treated sewage. Order 2006-0003-DWQ also required system-specific management, operation, and maintenance of publicly owned sewer systems greater than one mile in length. 920

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
10 To decrease the impacts on human health and the environment caused by sewage spills, the previous Order required enrollees to develop a rehabilitation and replacement plan that identifies system deficiencies and prioritizes short-term and long-term rehabilitation actions. The previous Order also required enrollees to:

1. Maintain information that can be used to establish and prioritize appropriate Sewer System Management Plan activities; and

2. Implement a proactive approach to reduce spills.

The previous Order required Sewer System Management Plan elements for “the proper and efficient management, operation, and maintenance of sanitary sewer systems, while taking into consideration risk management.”
On July 30, 2013, the State Water Board amended General Order 2006-0003-DWQ with Order WQ 2013-0058-EXEC, Amending Monitoring and Reporting Program for Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.

Many enrollees of Order 2006-0003-DWQ have already implemented proactive measures to reduce sewage spills. Other enrollees, however, still need technical assistance and funding to improve sanitary sewer system operation and maintenance for the reduction of sewage spills.

3.1.6. Existing Memorandum of Agreement with California Water Environment Association
The California Water Environment Association is a nonprofit organization dedicated to providing water industry certifications, training, and networking opportunities. The Association’s Technical Certification Program provides accredited sanitary sewer system operator certification for collection system operators and maintenance workers.

On February 10, 2016, the State Water Board entered into a collaborative agreement with the Association titled Memorandum of Agreement Between the California State Water Resources Control Board and the California Water Environment Association - Training Regarding Requirements Set Forth in Statewide General Waste Discharge Requirements for Sanitary Sewer Systems. The Memorandum sets forth collaborative training necessary for regulated sanitary sewer system personnel to operate and maintain a well operating system and ensure full compliance with statewide sewer system regulations.

On March 15, 2018, the State Water Board and the California Water Environment Association amended the existing Memorandum of Agreement to include collaborative outreach and expand training needs associated with further updates to Water Board regulations for sanitary sewer systems. The State Water Board encourages further Agreement updates as necessary to support improved sewer system operations and the professionalism of collection system operators.
921

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
11 3.2. General

3.2.1. Waters of the State
Waters of the State include any surface water or groundwater, including saline waters, within the boundaries of the state as defined in Water Code section 13050(e), and are inclusive of waters of the United States.

3.2.2. Sanitary Sewer System Spill Threats to Public Health and Beneficial Uses Sewage contains high levels of suspended solids, pathogenic organisms, toxic pollutants, nutrients, oxygen-demanding organic compounds, oil and grease and other pollutants. Sewage spills may cause a public nuisance, particularly when sewage is discharged to areas with high public exposure such as streets and surface waters used for drinking, irrigation, fishing, recreation, or other public consumption or contact uses.

More specifically, sanitary sewer spills may:
• Adversely affect aquatic life and/or threaten water quality when reaching receiving waters;
• Inadvertently release trash, including plastics;
• Impair the recreational use and aesthetic enjoyment of surface waters by polluting surface water or groundwater;
• Threaten public health through direct public exposure to bacteria, viruses, intestinal parasites, and other microorganisms that can cause serious illness such as gastroenteritis, hepatitis, cryptosporidiosis, and giardiasis; • Negatively impact ecological receptors and biota within surface waters; and • Cause nuisance including odors, closure of beaches and recreational areas, and property damage.

Sanitary sewer system spills may pollute receiving waters and threaten beneficial uses of surface water and groundwater. Potentially threatened beneficial uses include, but are not limited to the following (with associated acronym representations as included in statewide water quality control plans and Regional Water Boards’ Basin Plans):
• Municipal and Domestic Supply (MUN)
• Water Contact Recreation (REC-1) and Non-Contact Water Recreation (REC-2) • Cold Freshwater Habitat (COLD)
• Warm Freshwater Habitat (WARM)
• Native American Culture (CUL)
• Wildlife Habitat (WILD)
• Rare, Threatened, or Endangered Species (RARE)
• Spawning, Reproduction, and/or Early Development (SPWN) • Wetland Habitat (WET)
• Agricultural Supply (AGR)
• Estuarine Habitat (EST)
922

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
12 • Commercial and Sport Fishing (COMM)
• Subsistence Fishing (SUB)
• Tribal Tradition and Culture (CUL)
• Tribal Subsistence Fishing (T-SUB)
• Aquaculture (AQUA)
• Marine Habitat (MAR)
• Preservation of Biological Habitats of Special Significance (BIOL) • Migration of Aquatic Organisms (MIGR)
• Shellfish Harvesting (SHELL)
• Industrial Process Supply (PROC)
• Industrial Service Supply (IND)
• Hydropower Generation (POW)
• Navigation (NAV)
• Flood Peak Attenuation/Flood Water Storage (FLD)
• Water Quality Enhancement (WQE)
• Fresh Water Replenishment (FRSH)
• Groundwater Recharge (GWR)
• Inland Saline Water Habitat (SAL)

3.2.3. Proactive Sanitary Sewer System Management to Eliminate Spill Causes Finding 3 of the previous Order, 2006-0003-DWQ, states: “Sanitary sewer systems experience periodic failures resulting in discharges that may affect waters of the state.

There are many factors (including factors related to geology, design, construction methods and materials, age of the system, population growth, and system operation and maintenance), which affect the likelihood of an SSO [sanitary sewer overflow].

A proactive approach that requires Enrollees to ensure a system-wide operation, maintenance, and management plan is in place will reduce the number and frequency of SSOs within the state. This approach will in turn decrease the risk to human health and the environment caused by SSOs.”
Many spills are preventable through proactive attention on sanitary sewer system management using the best practices and technologies available to address major causes of spills, including but not limited to:
• Blockages from sources including but not limited to:
o Fats, oils and grease;
o Tree roots;
o Rags, wipes and other paper, cloth and plastic products; and o Sediment and debris.
• Sewer system damage and exceedance of sewer system hydraulic capacity from identified system-specific environmental, and climate-change impacts, including but not limited to:
923

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
13 o Sea level rise impacts including flooding, coastal erosion, seawater intrusion, tidal inundation and submerged lands;
o Increased surface water flows due to higher intensity rain events; o Flooding;
o Wildfires and wildfire induced impacts;
o Earthquake induced damage;
o Landslides; and
o Subsidence.
• Infrastructure deficiencies and failures, including but not limited to:
o Pump station mechanical failures;
o System age;
o Construction material failures;
o Manhole cover failures;
o Structural failures; and
o Lack of proper operation and maintenance.
• Insufficient system capacity (temporary or sustained), due to factors including but not limited to:
o Excessive and/or increased storm or groundwater inflow/infiltration; o Insufficient capacity due to population increase and/or new connections from industrial, commercial and other system users; and
o Stormwater capture projects utilizing a sanitary sewer system to convey stormwater to treatment facilities for reuse.
• Community impacts, including but not limited to:
o Power outages;
o Vandalism; and
o Contractor-caused or other third party-caused damages.

3.2.4. Underground Sanitary Sewer System Leakage
Portions of some sanitary sewer systems may leak, causing underground exfiltration (exiting) of sewage from the system. Exfiltrated sewage that remains in the underground infrastructure trench and/or the soil matrix, and that does not discharge into waters of the State (surface water or groundwater) may not threaten beneficial uses.

Underground exfiltrated sewage may threaten beneficial uses if discharged to waters of the State. Exfiltrated sewage that discharges to groundwater may impact beneficial uses of groundwater and pollute groundwater supply. Additionally, if in close proximity, exfiltrated sewage may enter into a compromised underground drainage conveyance system that discharges into a water of the United States, or into groundwater that is hydrologically connected to (feeds into) a water of the United States, thus potentially causing: (1) a Clean Water Act violation, (2) threat and impact to beneficial uses, and/or (3) surface water pollution.
924

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
14 3.2.5. Proactive Sanitary Sewer System Management to Reduce Inflow and Infiltration Excessive inflow (stormwater entering) and infiltration (groundwater seepage entering) to sanitary sewer systems is preventable through proactive sewer system management using the best practices and technologies available. The efficiency of the downstream wastewater treatment processes is dependent on the performance of the sanitary sewer system. When the structural integrity of a sanitary sewer system deteriorates, high volumes of inflow and infiltration can enter the sewer system. High levels of inflow and infiltration increase the hydraulic load on the downstream treatment plant, which can reduce treatment efficiency, lead to bypassing a portion of the treatment process, cause illegal discharge of partially treated effluent, or in extreme situations make biological treatment facilities inoperable (e.g., wash out the biological organisms that treat the waste).

3.3. Water Quality Control Plans, Policies and Resolutions The nine Regional Water Boards have adopted region-specific water quality control plans (commonly referred to as Basin Plans) that designate beneficial uses, establish water quality objectives, and contain implementation programs and policies to achieve those objectives. The State Water Board has adopted statewide water quality control plans, policies and resolutions establishing statewide water quality objectives, implementation programs and initiatives.

3.3.1. State Water Board Antidegradation Policy
On October 28, 1968, the State Water Board adopted Resolution 68-16, titled Statement of Policy with Respect to Maintaining High Quality of Waters in California, which incorporates the federal antidegradation policy. Resolution 68-16 requires that existing water quality be maintained unless degradation is justified based on specific findings.

The continued prohibition of sewage discharges from sanitary sewer systems into waters of the State aligns with Resolution 68-16. A sewage discharge from sanitary sewers to waters of the State is prohibited by this Order. Therefore, this Order does not allow degradation of waters of the State. In addition, this Order: (1) further expands the existing prohibition of sewage discharges to include waters of the State, in addition to waters of the United States as provided in previous Order 2006-0003-DWQ, and (2) enhances the ability for Water Board enforcement of violations of the established prohibitions.

3.3.2. State Water Board Sources of Drinking Water Policy On May 19,1988, the State Water Board adopted Resolution 88-63 (amended on February 1, 2006), titled Sources of Drinking Water, establishing state policy that all waters of the State, with certain exceptions, are suitable or potentially suitable for municipal or domestic supply.

3.3.3. State Water Board Cost of Compliance Resolution
On September 24, 2013, the State Water Board adopted Resolution 2013-0029, titled Directing Actions in Response to Efforts by Stakeholders on Reducing Costs of 925

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
15 Compliance While Maintaining Water Quality Protection. Through this resolution, the State Water Board committed to continued stakeholder engagement in identifying and implementing measures to reduce costs of compliance with regulatory orders while maintaining water quality protection and improving regulatory program outcomes.

3.3.4. State Water Board Human Right to Water Resolution On February 16, 2016, the State Water Board adopted Resolution 2016-0010, titled Adopting the Human Right to Water as a Core Value and Directing its Implementation in Water Board Programs and Activities, addressing the human right to water as a core value and directing Water Board programs to implement requirements to support safe drinking water for all Californians.

On November 16, 2021, the State Water Board adopted Resolution 2021-0050 titled Condemning Racism, Xenophobia, Bigotry, and Racial Injustice, and Strengthening Commitment to Racial Equity, Diversity, Inclusion, Access, and Anti-racism. Among other actions, through Resolution 2021-0050, the State Water Board, in summary as corresponding to this General Order, reaffirms its commitment to its Human Right to Water resolution, upholding that every human being in California deserves safe, clean, affordable, and accessible water for human consumption, cooking, and sanitation purposes. Resolution 2021-0050 provides the State Water Board commitment to:
• Protect public health and beneficial uses of waterbodies in all communities, including communities disproportionately burdened by wastes discharge of waste to land and surface water;
• Restore impaired surface waterbodies and degraded aquifers; and • Promote multi-benefit water quality projects.

Through Resolution 2021-0050, the State Water Board also commits to expanding implementation of its Climate Change Resolution to address the disproportionate effects of extreme hydrologic conditions and sea-level rise on Black, Indigenous, and people of color communities, prioritizing:
• The right to safe, clean, affordable, and accessible drinking water and sanitation; • Sustainable management and protection of local groundwater resources; • Healthy watersheds; and
• Access to surface waterbodies that support subsistence fishing.

On June 7, 2022, the State Water Board adopted a Resolution, titled Authorizing the Executive Director or Designee to Enter into One or More Multi-Year Contracts Up to a Combined Sum of $4,000,000 for a Statewide Wastewater Needs Assessment, supporting the equitable access to sanitation for all Californians and implementation of Resolutions 2016-0010 and 2021-0050.

This General Order supports the State Water Board priority in collecting a comprehensive set of data for California’s wastewater systems, including sanitary sewer systems. Data reported per the requirements of this Order will be used with data from other Water Boards’ programs, to further develop criteria and create a statewide risk 926

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
16 framework to prioritize critical funding and infrastructure investments for California’s most vulnerable populations, including disadvantaged or severely disadvantaged communities with inadequate or failing sanitation systems and threatened access to healthy drinking water supplies.

3.3.5. State Water Board Open Data Resolution
On July 10, 2018, the State Water Board adopted Resolution 2018-0032, titled Adopting Principles of Open Data as a Core Value and Directing Programs and Activities to Implement Strategic Actions to Improve Data Accessibility and Associated Innovation, directing regulatory programs to assure all monitoring and reporting requirements support the State Water Boards’ Open Data Initiative.

3.3.6. State Water Board Response to Climate Change
On March 7, 2017, the State Water Board adopted Resolution 2017-0012, titled Comprehensive Response to Climate Change, requiring a proactive response to climate change in all California Water Board actions, with the intent to embed climate change consideration into all programs and activities.

3.4. California Environmental Quality Act
The adoption of this Order is an action to reissue general waste discharge requirements that is exempt from the California Environmental Quality Act (Public Resources Code section 21000 et seq.) because it is an action taken by a regulatory agency to assure the protection of the environment and the regulatory process involves procedures for protection of the environment (Cal. Code Regs., Title 14, section 15308). In addition, the action to adopt this Order is exempt from CEQA pursuant to Cal. Code Regs., Title 14, section 15301, to the extent that it applies to existing sanitary sewer collection systems that constitute “existing facilities” as that term is used in sections 15301 and 15302, to the extent that it results in the repair or replacement of existing systems involving negligible or no expansion of capacity.

3.5. State Water Board Funding Assistance for Compliance with Water Board Water Quality Orders
The State Water Board, Division of Financial Assistance administers the implementation of the State Water Board financial assistance programs, per Board-adopted funding policies. Among other funding areas, the Division administers loan and grant funding for the planning and construction of wastewater and water recycling facilities per funding program-specific policies and guidelines. Applicants may apply for Clean Water State Revolving Fund low-interest loan, Small Community Wastewater grant funding assistance, and other funding available at the time of application, for some of the costs associated with complying with this General Order.

Funding applicants may obtain further information regarding current funding opportunities, and Division of Financial Assistance staff contact information at the following website: Financial Assistance Funding - Grants and Loans | California State Water Resources Control Board.
(https://www.waterboards.ca.gov/water_issues/programs/grants_loans/) 927

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
17 Section 13477.6 of the Water Code authorizes the Small Community Grant Fund.

The Small Community Grant Fund allows the State Water Board to provide grant funding assistance to small, disadvantaged communities and small severely disadvantaged communities that may not otherwise be able to afford a loan or similar financing for projects to comply with requirements of this General Order. The State Water Board also considers loan forgiveness on a disadvantaged community-specific basis.

For disadvantaged communities’ wastewater needs, the State Water Board places priority on the funding of projects that address:
• Public health;
• Violations of waste discharge requirements and National Pollutant Discharge Elimination System (NPDES) permits;
• Providing sewer system service to existing septic tank owners; and • High priority public health and water quality concerns identified by a Regional Water Board.

3.6. Notification to Interested Parties
On January 31, 2022, the State Water Board notified interested parties and persons of its intent to reissue Sanitary Sewer Systems General Order 2006-0003-DWQ by issuing a draft General Order for a 60-day public comment period. State Water Board staff conducted extensive stakeholder outreach and encouraged public participation in the adoption process for this General Order. On March 15, 2022, the State Water Board held a public meeting to hear and consider oral public comments. The State Water Board considered all public comments prior to adopting this General Order.

THEREFORE, IT IS HEREBY ORDERED, that pursuant to Water Code sections 13263, 13267, and 13383 this General Order supersedes Order 2006-0003-DWQ, Order WQ 2013-0058-EXEC, and any amendments made to these Orders thereafter, except for enforcement purposes and to meet the provisions contained in Division 7 of the Water Code (commencing with section 13000) and regulations adopted thereunder, and the provisions of the Clean Water Act and regulations and guidelines adopted thereunder, the Enrollee shall comply with the requirements in this Order.

4. PROHIBITIONS

4.1 Discharge of Sewage from a Sanitary Sewer System
Any discharge from a sanitary sewer system that has the potential to discharge to surface waters of the State is prohibited unless it is promptly cleaned up and reported as required in this General Order.

4.2. Discharge of Sewage to Waters of the State
Any discharge from a sanitary sewer system, discharged directly or indirectly through a drainage conveyance system or other route, to waters of the State is prohibited. 928

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
18 4.3. Discharge of Sewage Creating a Nuisance
Any discharge from a sanitary sewer system that creates a nuisance or condition of pollution as defined in Water Code section 13050(m) is prohibited.

5. SPECIFICATIONS

5.1. Designation of a Legally Responsible Official
The Enrollee shall designate a Legally Responsible Official that has authority to ensure the enrolled sanitary sewer system(s) complies with this Order, and is authorized to serve as a duly authorized representative. The Legally Responsible Official must have responsibility over management of the Enrollee’s entire sanitary sewer system, and must be authorized to make managerial decisions that govern the operation of the sanitary sewer system, including having the explicit or implicit duty of making major capital improvement recommendations to ensure long-term environmental compliance.

The Legally Responsible Official must have or have direct authority over individuals that:
• Possess a recognized degree or certificate related to operations and maintenance of sanitary sewer systems, and/or
• Have professional training and experience related to the management of sanitary sewer systems, demonstrated through extensive knowledge, training and experience.

For example, a sewer system superintendent or manager, an operations manager, a public utilities manager or director, or a district engineer may be designated as a Legally Responsible Official.

The Legally Responsible Official shall complete the electronic CIWQS “User Registration” form (https://ciwqs.waterboards.ca.gov/ciwqs/newUser.jsp). A Legally Responsible Official that represents multiple enrolled systems shall complete the electronic CIWQS “User Registration” form for each system.

The Enrollee shall submit any change to its Legally Responsible Official, and/or change in contact information, to the State Water Board within 30 calendar days of the change by emailing [email protected] and copying the appropriate Regional Water Board as provided in Attachment F (Regional Water Quality Control Board Contact Information) of this General Order.

5.2. Sewer System Management Plan Development and Implementation To facilitate adequate local funding and management of its sanitary sewer system(s), the Enrollee shall develop and implement an updated Sewer System Management Plan.

The scale and complexity of the Sewer System Management Plan, and specific elements of the Plan, must match the size, scale and complexity of the Enrollee’s sanitary sewer system(s). The Sewer System Management Plan must address, at minimum, the required Plan elements in Attachment D (Sewer System Management Plan – Required Elements) of this General Order. To be effective, the Sewer System Management Plan must include procedures for the management, operation, and maintenance of the sanitary sewer system(s). The procedures must: (1) incorporate the 929

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
19 prioritization of system repairs and maintenance to proactively prevent spills, and (2) address the implementation of current standard industry practices through available equipment, technologies, and strategies.

For an existing Enrollee under Order 2006-0003-DWQ that has certified its Continuation of Existing Regulatory Coverage, per section 2.1 (Requirements for Continuation of Existing Regulatory Coverage) of this General Order:

Within six (6) months of the Adoption Date of this General Order:
• The Legally Responsible Official shall upload the Enrollee’s existing Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database.

For a new Enrollee:

Within twelve (12) months of the Application for Enrollment approval date:
• The governing entity of the new Enrollee shall approve its Sewer System Management Plan; and
• The Legally Responsible Official shall certify and upload its Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database.

5.3. Certification of Sewer System Management Plan and Plan Updates The Legally Responsible Official shall certify and upload its Sewer System Management Plan and all subsequent updates to the online CIWQS Sanitary Sewer System Database.

5.4. Sewer System Management Plan Audits
The Enrollee shall conduct an internal audit of its Sewer System Management Plan, and implementation of its Plan, at a minimum frequency of once every three years. The audit must be conducted for the period after the end of the Enrollee’s last required audit period. Within six months after the end of the required 3-year audit period, the Legally Responsible Official shall submit an audit report into the online CIWQS Sanitary Sewer System Database per the requirements in section 3.10 (Sewer System Management Plan Audit Reporting Requirements) of Attachment E1 of this General Order.

Audit reports submitted to the CIWQS Sanitary Sewer System Database will be viewable only to Water Boards staff.

The internal audit shall be appropriately scaled to the size of the system(s) and the number of spills. The Enrollee’s sewer system operators must be involved in completing the audit. At minimum, the audit must:
• Evaluate the implementation and effectiveness of the Enrollee’s Sewer System Management Plan in preventing spills;
• Evaluate the Enrollee’s compliance with this General Order; • Identify Sewer System Management Plan deficiencies in addressing ongoing spills and discharges to waters of the State; and
930

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
20 • Identify necessary modifications to the Sewer System Management Plan to correct deficiencies.

The Enrollee shall submit a complete audit report that includes:
• Audit findings and recommended corrective actions;
• A statement that sewer system operators’ input on the audit findings has been considered; and
• A proposed schedule for the Enrollee to address the identified deficiencies.

A new Enrollee of this General Order (that did not have a sanitary sewer system enrolled in the previous State Water Board Order 2006-0003-DWQ) shall conduct its first internal Sewer System Management Plan audit for the time period between the date of submittal of its certified Sewer System Management Plan and the third subsequent December 31st date. The audit report must be submitted into the online CIWQS Sanitary Sewer System Database by July 1 of the following calendar year.

See the following tables for clarification:

Initial Audit Period and Audit Due Date for New Enrollees Audit Period Audit Due Date
New Enrollee
Certified Sewer System Management
Plan Submittal Date
through
the third subsequent December 31
st date
July 1
st date after
audit period
Example
Certified Sewer System Management
Plan Submittal Date of August 2, 2025
Audit Period of August 2, 2025 through
December 31, 2027
July 1, 2028
931

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
21 Initial Audit Period for Transition from 2-Year Audit Required in Previous Order 2006-0003-DWQ to 3-Year Audit Required in this General Order Audit Period Audit Due Date
An Enrollee
previously
regulated by Order
2006-003-DWQ
A 3-year period starting from the end of
last required 2-year Audit Period
Within six months
after end of 3-year
Audit Period
Example
Last required Audit Period start date of
August 2, 2021;
Audit Period of August 2, 2021 through
August 1, 2024
February 1, 2025
Three-Year Ongoing Audit Period
Audit Period Audit Due Date
Each Enrollee A 3-year period starting from the end of
last required Audit Period
Within six months
after end of 3-year
Audit Period

5.5. Six-Year Sewer System Management Plan Update
At a minimum, the Enrollee shall update its Sewer System Management Plan every six (6) years after the date of its last Plan Update due date. (For an Enrollee previously regulated by Order 2006-0003-DWQ, the six-year period shall commence on the due date identified in section 3.11 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this Order. The Updated Sewer System Management Plan must include:
• Elements required in Attachment D (Sewer System Management Plan – Required Elements) of this Order;
• Summary of revisions included in the Plan update based on internal audit findings; and
• Other sewer system management-related changes.

The Enrollee’s governing entity shall approve the updated Plan. The Legally Responsible Official shall upload and certify the approved updated Plan in the online CIWQS Sanitary Sewer System Database in accordance with section 3.11 (Sewer System Management Plan Reporting Requirements) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order. During the time period in between Plan updates, the Enrollee shall continuously document changes to its Sewer System Management Plan in a change log attached to the Plan. 932

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
22 5.6. System Resilience
The Enrollee shall include and implement system-specific procedures in its Sewer System Management Plan to proactively prioritize: (1) operation and maintenance, (2) condition assessments, and (3) repair and rehabilitation, to address ongoing system resilience, as specified in Attachment D (Sewer System Management Plan – Required Elements) of this General Order.

5.7. Allocation of Resources
The Enrollee shall:
• Establish and maintain a means to manage all necessary revenues and expenditures related to the sanitary sewer system; and
• Allocate the necessary resources to its sewer system management program for:
o Compliance with this General Order,
o Full implementation of its updated Sewer System Management Plan, o System operation, maintenance, and repair, and
o Spill responses.

5.8. Designation of Data Submitters
The Legally Responsible Official may designate one or more individuals as a Data Submitter for reporting of spill data. The Legally Responsible Official shall authorize the designation of Data Submitter(s) through the online CIWQS database (https://ciwqs.waterboards.ca.gov) prior to the individuals establishing a CIWQS user account (https://ciwqs.waterboards.ca.gov/ciwqs/newUser.jsp) and entering spill data into the online CIWQS Sanitary Sewer System Database.

The Legally Responsible Official shall submit any change to its Data Submitter(s), and/or change in Data Submitter contact information, to the State Water Board within 30 calendar days of the change, by emailing [email protected] and copying the appropriate Regional Water Board as provided in Attachment F (Regional Water Quality Control Board Contact Information) of this General Order.

5.9. Reporting Certification
The Legally Responsible Official shall electronically certify, on the Enrollee’s behalf, all applications, reports, the Sewer System Management Plan(s) and corresponding updates, and other information submitted electronically into the online CIWQS Sanitary Sewer System Database, as follows:
“I certify under penalty of perjury under the laws of the State of California that the electronically submitted information was prepared under my direction or supervision.

Based on my inquiry of the person(s) directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is true, accurate, and complete, and complies with the Statewide Sanitary Sewer Systems General Order.

I am aware that there are significant penalties for submitting false information.” 933

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
23 Hardcopy submittals to the State Water Board must be accompanied by the above certification statement.

5.10. System Capacity
The Enrollee shall maintain the system capacity necessary to convey: (1) base flows during dry weather conditions, and (2) wet weather peak flows consistent with designated local historic storms. Design storms must take into account system-specific stormwater contributions via inflow and infiltration, and location-specific depth of groundwater and storm frequencies. The Enrollee shall implement capital improvements to provide adequate hydraulic capacity to:
• Meet or exceed the design criteria as defined in the Enrollee’s System Evaluation and Capacity Assurance element of its Sewer System Management Plan; and • Prevent system capacity-related spills, and adverse impacts to the treatment efficiency of downstream wastewater treatment facilities.

5.11. System Performance Analysis
The Enrollee shall include a running 10-year system performance analysis in its Annual Report. The analysis must include two CIWQS-generated graphs presenting the following information:

Graph 1 – Total Spill Volume per Year:

X axis: A 10-year period which includes the current calendar year and the nine previous calendar years;
Y axis: The total spill volume, per Spill Category, for each calendar year.

Graph 2 – Total Number of Spills per Year:

X axis: A 10-year period which includes the current calendar year and the nine previous calendar years;
Y axis: The total number of spills, per Spill Category, for each calendar year.

The current calendar year is the calendar year covered in the Annual Report.

The Enrollee shall generate the graphs in CIWQS, using the existing data in the online CIWQS Sanitary Sewer System Database at the following graph generation link:
(https://ciwqs.waterboards.ca.gov/ciwqs/readOnly/PublicReportSSOServlet?reportActio n=criteria&reportId=sso_operation_report).

5.12. Spill Emergency Response Plan and Remedial Actions For Existing Enrollees (with regulatory coverage under Order 2006-0003-DWQ):

Within six (6) months of the Adoption Date of this General Order, the Enrollee shall update and implement its Spill Emergency Response Plan, per Attachment D, section 6 (Spill Emergency Response Plan) of this General Order. 934

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
24 For New Enrollees:

Within six (6) months of the Application for Enrollment approval date, the Enrollee shall develop and implement a Spill Emergency Response Plan, per Attachment D, section 6 (Spill Emergency Response Plan) of this General Order.

The Enrollee shall certify, in its Annual Report, that its Spill Emergency Response Plan is up to date.

The Spill Emergency Response Plan shall include measures to protect public health and the environment. The Enrollee shall respond to spills from its system(s) in a timely manner that minimizes water quality impacts and nuisance by:
• Immediately stopping the spill and preventing/minimizing a discharge to waters of the State;
• Intercepting sewage flows to prevent/minimize spill volume discharged into waters of the State;
• Thoroughly recovering, cleaning up and disposing of sewage and wash down water; and
• Cleaning publicly accessible areas while preventing toxic discharges to waters of the State.

5.13. Notification, Monitoring, Reporting and Recordkeeping Requirements The Enrollee shall comply with notification, monitoring, reporting, and recordkeeping requirements in Attachment E1 of this General Order.

5.13.1. Spill Categories
Individual spill notification, monitoring and reporting must be in accordance with the following spill categories:
• Category 1 Spill
A Category 1 spill is a spill of any volume of sewage from or caused by a sanitary sewer system regulated under this General Order that results in a discharge to:
o A surface water, including a surface water body that contains no flow or volume of water; or
o A drainage conveyance system that discharges to surface waters when the sewage is not fully captured and returned to the sanitary sewer system or disposed of properly.

Any spill volume not recovered from a drainage conveyance system is considered a discharge to surface water, unless the drainage conveyance system discharges to a dedicated stormwater infiltration basin or facility. 935

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
25 A spill from an Enrollee-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the Enrollee shall report all Category 1 spills per section

3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.
• Category 2 Spill
A Category 2 spill is a spill of 1,000 gallons or greater, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of 1,000 gallons or greater that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system, is a Category 2 spill. • Category 3 Spill
A Category 3 spill is a spill of equal to or greater than 50 gallons and less than 1,000 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of equal to or greater than 50 gallons and less than 1,000 gallons, that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 3 spill.
• Category 4 Spill
A Category 4 spill is a spill of less than 50 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of less than 50 gallons that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 4 spill.

5.13.2. Annual Report
The Enrollee shall submit an Annual Report (previously termed as Collection System Questionnaire in Order 2006-0003-DWQ) as specified in section 3.9 (Annual Report) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

For new Enrollees: Within 30 days of obtaining a CIWQS account, a new Enrollee shall submit its initial Annual Report, as specified in section 3.9 (Annual Report) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.
936

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
26 5.14. Electronic Sanitary Sewer System Service Area Boundary Map For continuing enrollees, starting on July 1, 2025, and no later than December 31, 2025:

For new enrollees – no earlier than July 1, 2025, or within 12 months of the Application for Enrollment approval date, whichever date is later:

The Legally Responsible Official shall submit, to the State Water Board, geospatial data detailing the locations of the Enrollee’s sanitary sewer system service area boundary, per the required content and specifications in section 3.8 (Electronic Sanitary Sewer System Service Area Boundary Map) of Attachment E1 of this General Order, for each system identified by a WDID number.

An Enrollee of a disadvantaged community that may need assistance developing an electronic map to comply with this requirement, may contact State Water Board staff for assistance at [email protected].

5.15. Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems
Within 24 hours of becoming aware of a spill (as described below) from a private sewer lateral or private sanitary sewer system that is not owned/operated by the Enrollee, the Enrollee is encouraged to report the following observations to the online CIWQS Sanitary Sewer System Database at the following link:
https://ciwqs.waterboards.ca.gov:
• A spill equal or greater than 1,000 gallons that discharges (or has a potential to discharge) to a water of the State, or a drainage conveyance system that discharges to waters of the State; or
• Any volume of sewage that discharges (or has a potential to discharge) to surface waters.

In the CIWQS module, the Enrollee is encouraged to identify:
• Time of observation;
• Description of general spill location (for example, street name and cross street names);
• Estimated volume of spill;
• If known, general description of spill destination (for example, flowing into drainage channel, flowing directly into a creek, etc.); and
• If known, name of private system owner/operator.

The CIWQS database will make the name and contact information of the entity voluntarily reporting a private spill, accessible to State and Regional Water Board staff only. The CIWQS database will only make information regarding the actual spill, accessible to the public.
937

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
27 5.16. Voluntary Notification of Spills from Privately-Owned Laterals and/or Systems to the California Office of Emergency Services
Upon observing or acquiring knowledge of any of the following from a private sewer lateral or private sanitary sewer system that is not owned/operated by the Enrollee, the Enrollee is encouraged to notify the California Office of Emergency Services (as provided by Health and Safety Code section 5410 et. seq. and Water Code section 13271), or inform the responsible party that State law requires such notification to the Office of Emergency Services by any person that causes or allows a sewage discharge to waters of the State:
• A spill equal to 1,000 gallons or more that discharges (or has a potential to discharge) to waters of the State, or a drainage conveyance system that discharges to waters of the State; or
• A spill of any volume to surface waters.

5.17. Unintended Failure to Report
If an Enrollee becomes aware that they unintentionally failed to submit relevant facts in any report required in this General Order, the Enrollee shall promptly notify Regional Water Board and State Water Board staff. Regional Water Board contact information is included in Attachment F of this Order. State Water Board staff shall be contacted by email at [email protected] for assistance in formally amending the corresponding report(s) in the online CIWQS Sanitary Sewer System Database.

5.18. Duty to Report to Water Boards
In accordance with Water Code section 13267 and/or section 13383, upon request by the State Water Board Executive Director (or designee) or a Regional Water Board Executive Officer (or designee), the Enrollee shall provide the requested information which the State or Regional Water Board deems necessary to determine compliance with this General Order.

5.19. Operation and Maintenance
To prevent discharges to the environment, the Enrollee shall maintain in good working order, and operate as designed, any facility or treatment and control system designed to contain sewage and convey it to a treatment plant.

6. PROVISIONS

6.1. Enforcement Provisions
The following enforcement provisions are based on existing federal and state regulations, laws and policies, including the federal Clean Water Act, the state Water Code and the State Water Board Enforcement Policy.

6.1.1. Enforceability of Clean Water Act and Water Code Violations Noncompliance with requirements of this General Order or discharging sewage without enrolling in this General Order constitutes a violation of the Water Code and a potential 938

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
28 violation of the Clean Water Act and is grounds for an enforcement action by the State Water Board or the applicable Regional Water Board. Failure to comply with the notification, monitoring, inspection, entry, reporting, and recordkeeping requirements may subject the Enrollee to administrative civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement. Discharging waste not in compliance with the requirements of this General Order or the Clean Water Act may subject the Enrollee to administrative civil liabilities up to $10,000 a day per violation and additional liability up to $10 per gallon of discharge not cleaned up after the first 1,000 gallons of discharge; up to $5,000 a day per violation pursuant to Water Code section 13350 or up to $20 per gallon of waste discharged; or referral to the Attorney General for judicial civil enforcement.

6.1.2. Monetary Penalties
The Water Code provides the State and Regional Water Boards the authority to pursue formal enforcement actions, including imposing administrative liability and civil monetary penalties, for non-compliance with the requirements of this General Order and violations of the Clean Water Act.

6.1.3. Falsifying or Failure to Report
The Water Code provides that any person failing or refusing to furnish technical or monitoring program reports, as required under this General Order, or falsifying any information provided in the technical or monitoring reports is subject to administrative liability and civil monetary penalties. Any person who knowingly fails or refuses to furnish technical or monitoring program reports or falsifies any information provided in reports required by this General Order is subject to criminal penalties.

6.1.4. Severability of General Order
The provisions of this General Order are severable; if any provision of this Order, or the application of any provision of this Order to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this Order shall not be affected thereby.

6.1.5. Indirect Discharges
In the event that a spill enters into a drainage conveyance system, the Enrollee shall take all feasible steps to prevent discharge of sewage into waters of the State by blocking or redirecting the flow in the drainage conveyance system, removing the sewage from the drainage conveyance system, and cleaning the system in a manner that does not inadvertently impact beneficial uses of the receiving water body.

6.1.6. Water Boards’ Considerations for Discretionary Enforcement Consistent with the State Water Board Enforcement Policy, when considering Water Code section 13327 factors, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts to contain, control, clean up, and mitigate spills. In assessing the factors, the State Water Board or the applicable Regional Water Board will consider:
939

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
29 • The Enrollee’s compliance with this General Order with a focus on compliance with reporting requirements;
• The Enrollee’s provision of adequate funding to implement the requirements of this General Order;
• The Enrollee’s compliance with providing a complete and updated Sewer System Management Plan;
• The Enrollee’s compliance with implementing its Sewer System Management Plan; • The overall effectiveness of the Enrollee’s Sewer System Management Plan with respect to:
o System management, operation, and maintenance,
o Adequate treatment facilities, sanitary sewer system facilities, and/or components with an appropriate design capacity, to reasonably prevent spills (e.g. adequately enlarging treatment or collection facilities to accommodate growth, infiltration and inflow, etc.),
o Preventive maintenance (including cleaning, root grinding, and fats, oils, and grease control) and source control measures,
o Implementation of backup equipment,
o Inflow and infiltration prevention and control,
o Appropriate sanitary sewer system capacity to prevent spills, and o The Enrollee’s responsiveness to stop and mitigate the impact of the discharge; • The Enrollee’s compliance with identifying the cause of the spill; • The Enrollee’s use of available information and observations to accurately estimate the spill volume and identify the affected or potentially affected receiving waters; • The Enrollee’s thoroughness of cleaning up sewage in drainage conveyance systems after the spill(s);
• The Enrollee’s use of water quality and biological monitoring and assessment to determine the short-term and long-term impacts to beneficial uses and the environment;
• The Enrollee’s follow up actions to improve system performance; • The Enrollee’s implementation of feasible alternatives to prevent spills, such as:
o Use of temporary storage or waste retention,
o Reduction of system inflow and infiltration,
o Collection and hauling of waste to a treatment facility, o Prevention of and/ or containment of spills due to a design storm event identified in the Enrollee’s Sewer System Management Plan,
940

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
30 o Implementation of available equipment, technologies, strategies, and recommended industry practices for maintaining and managing sewer systems to prevent spills, and contain and eliminate discharges to waters of the State; and • The spill duration and factors beyond the reasonable control of the Enrollee causing the event.

6.1.7. Enforcement Discretion Based on Reporting Compliance Consistent with the State Water Board Enforcement Policy, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts to comply with spill reporting requirements when determining compliance with Water Code section 13267 and section 13383. When assessing Water Code section 13227 factors, the State Water Board or the applicable Regional Water Board will consider:
• The Enrollee’s diligence to comply with all reporting requirements in this General Order;
• The use of best available information for the Enrollee’s reporting of spill start date and start time in which the release of sewage from the sanitary sewer system initiated;
• The Enrollee’s reporting of spill end date, and end time to be the date and time in which the release of sewage from the sanitary sewer system was stopped; • The Enrollee’s diligence to accurately estimate and report spill volumes; • The Enrollee’s subsequent verification and/or updates to initial Draft Spill Reports in accordance with this General Order; and
• The Enrollee’s timely certification of required spill reports.

Consistent with Water Code section 13267 and section 13383, the State Water Board or a Regional Water Board may require an Enrollee to report the results of a condition assessment of a specified portion of the Enrollee’s sanitary sewer system.

6.2. Other Regional Water Board Orders
It is the intent of the State Water Board that sanitary sewer systems be regulated in a manner consistent with federal and state regulations. This Order will not be interpreted or applied:
• In a manner inconsistent with the federal Clean Water Act; • To authorize a spill or discharge that is illegal under either the Clean Water Act, the Water Code, and/or an applicable Basin Plan prohibition or water quality standard; • To prohibit a Regional Water Board from issuing an individual National Pollutant Discharge Elimination System (NPDES) permit or individual waste discharge requirements superseding an Enrollee’s regulatory coverage under this General Order for a sanitary sewer system authorized under the Clean Water Act or Water Code;
941

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
31 • To supersede any more specific or more stringent waste discharge requirements or enforcement orders issued by a Regional Water Board; or • To supersede any more specific or more stringent state or federal requirements in existing regulation, an administrative/judicial order, or Consent Decree.

6.3. Sewer System Management Plan Availability
The Enrollee’s updated Sewer System Management Plan must be maintained for public inspection at the Enrollee’s offices and facilities and must be available to the public through CIWQS and/or on the Enrollee’s website, in accordance with section 3.8 (Sewer System Management Plan Reporting Requirements) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

6.4. Entry and Inspection

6.4.1. Entry and Availability of Information
The Enrollee shall allow State and Regional Water Board staff, upon presentation of credentials and other documents as may be required by law, to:
• Enter upon the Enrollee’s premises where a regulated facility or activity is located or conducted, or where records are kept under the requirements of this General Order; • Have access to and reproduce any records required to be maintained by this General Order;
• Inspect any facility and/or equipment (including monitoring and control equipment), practices, or operations required in this General Order; and • Sample or monitor substances or parameters for assuring compliance with this General Order, or as otherwise authorized by the Water Code.

6.4.2. Pre-Inspection Questionnaire
The Enrollee shall provide pre-inspection information to State and Regional Water Board staff through the completion of a Pre-Inspection Questionnaire provided by Water Board staff.
942
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 1

ATTACHMENT A - DEFINITIONS
Annual Report
An Annual Report (previously termed as Collection System Questionnaire in Order 2006-0003-DWQ) is a mandatory report in which the Enrollee provides a calendar-year update of its efforts to prevent spills.

Basin Plan
A Basin Plan is a water quality control plan specific to a Regional Water Quality Control Board (Regional Water Board), that serves as regulations to: (1) define and designate beneficial uses of surface and groundwaters, (2) establish water quality objectives for protection of beneficial uses, and (3) provide implementation measures.

Beneficial Uses
The term “Beneficial Uses” is a Water Code term, defined as the uses of the waters of the State that may be protected against water quality degradation. Examples of beneficial uses include but are not limited to, municipal, domestic, agricultural and industrial supply; power generation; recreation; aesthetic enjoyment; navigation; and preservation and enhancement of fish, wildlife, and other aquatic resources or preserves.

California Integrated Water Quality System (CIWQS)
CIWQS is the statewide database that provides for mandatory electronic reporting as required in State and Regional Water Board-issued waste discharge requirements.

Data Submitter
A Data Submitter is an individual designated and authorized by the Enrollee’s Legally Responsible Official to enter spill data into the online CIWQS Sanitary Sewer System Database. A Data Submitter does not have the authority of a Legally Responsible Official to certify reporting entered into the online CIWQS Sanitary Sewer System Database.

Disadvantaged Community
A disadvantaged community is a community with a median household income of less than eighty percent (80%) of the statewide annual median household income.

For the purpose of this General Order, there is no differentiation between a small and large disadvantaged community.

Drainage Conveyance System
A drainage conveyance system is a publicly- or privately-owned separate storm sewer system, including but not limited to drainage canals, channels, pipelines, pump stations, detention basins, infiltration basins/facilities, or other facilities constructed to transport stormwater and non-stormwater flows.
943
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 2
Enrollee
An Enrollee is a public, private, or other non-governmental entity that has obtained approval for regulatory coverage under this General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
• greater than one (1) mile in length (each individual sanitary sewer system); • one mile or less in length where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under this Order, or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under this Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.

Environmentally Sensitive Area
An environmentally sensitive area is a designated agricultural and/or wildlife area identified to need special natural landscape protection due to its wildlife or historical value.

Exfiltration
Exfiltration is the underground exiting of sewage from a sanitary sewer system through cracks, offset or separated joints, or failed infrastructure due to corrosion or other factors.

Flood Control Channel
A flood control channel is a channel used to convey stormwater and non-stormwater flows through and from areas for flood management purposes.

Governing Entity
A governing entity includes but is not limited to the following:
• A publicly elected governing board, council, or commission of a municipal agency; • A Department or Division director of a federal or state agency that is not governed by a board;
• A governing board or commission of an organization or association; and • A private system owner/manager that is not governed by a board.

Hydrologically Connected
Two waterbodies are hydrologically connected when one waterbody flows, or has the potential to flow, into the other waterbody. For the purpose of this General Order, groundwater is hydrologically connected to a surface water when the
groundwater feeds into the surface water. (The surface
waterbody in this example is termed a gaining stream as it gains flow from surrounding groundwater.)
944
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 3
Lateral (including Lower and Upper Lateral)
A lateral is an underground segment of smaller diameter pipe that transports sewage from a customer’s building or property (residential, commercial, or industrial) to the Enrollee’s main sewer line in a street or easement. Upper and lower lateral boundary definitions are subject to local jurisdictional codes and ordinances, or private system ownership.

A lower lateral is the portion of the lateral located between the sanitary sewer system main, and either the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations.

An upper lateral is the portion of the lateral from the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations, to the building or property.

Legally Responsible Official
A Legally Responsible Official is an official representative, designated by the Enrollee, with authority to sign and certify submitted information and documents required by this General Order.

Nuisance
For the purpose of this General Order, a nuisance, as defined in Water Code section 13050(m), is anything that meets all of the following requirements:
• Is injurious to health, or is indecent or offensive to the senses, or an obstruction to the free use of property, so as to interfere with the comfortable enjoyment of life or property; • Affects at the same time an entire community or neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal; and
• Occurs during, or as a result of, the treatment or disposal of wastes.

Private Sewer Lateral
A private sewer lateral is the privately-owned lateral that transports sewage from private property(ies) into a sanitary sewer system.

Private Sanitary Sewer System
A private sanitary sewer system is a sanitary sewer system of any size that is owned and/or operated by a private individual, company, corporation, or organization. A private sanitary sewer system may or may not connect into a publicly owned sanitary sewer system.

Potential to Discharge, Potential Discharge
Potential to Discharge, or Potential Discharge, means any exiting of sewage from a sanitary sewer system which can reasonably be expected to discharge into a water of the State based on the size of the sewage spill, proximity to a drainage conveyance system, and the nature of the surrounding environment.
945
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 4
Receiving Water
A receiving water is a water of the State that receives a discharge of waste.

Resilience
Resilience is the ability to recover from or adjust to adversity or change, and grow from disruptions. Resilience can be built through planning, preparing for, mitigating, and adapting to changing conditions.

Sanitary Sewer System
A sanitary sewer system is a system that is designed to convey sewage, including but not limited to, pipes, manholes, pump stations, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks, including:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.

For purpose of this Order, sanitary sewer systems include only systems owned and/or operated by the Enrollee.

Satellite Sewer System
A satellite sewer system is a portion of a sanitary sewer system owned or operated by a different owner than the owner of the downstream wastewater treatment facility ultimately treating the sewage.

Sewer System Management Plan
A sewer system management plan is a living document an Enrollee develops and implements to effectively manage its sanitary sewer system(s) in accordance with this General Order.

Sewage
Sewage, and its associated wastewater, is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

Spill
A spill is a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Exfiltration of sewage is not considered to be a spill under this General Order if the exfiltrated sewage remains in the subsurface and does not reach a surface water of the State.

Training
Training is in-house or external education and guidance needed that provides the knowledge, skills, and abilities to comply with this General Order. 946
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 5
Wash Down Water
Wash down water is water used to clean a spill area.

Waste
Waste, as defined in Water Code section 13050(d), includes sewage and any and all other waste substances, liquid, solid, gaseous, or radioactive, associated with human habitation, or of human or animal origin, or from any producing, manufacturing, or processing operation, including waste placed within containers of whatever nature prior to, and for purposes of, disposal.

Waste Discharge Identification Number (WDID)
A waste discharge identification number (WDID) identifies each individual sanitary sewer system enrolled under this General Order. A WDID number is assigned to each enrolled system upon an Enrollee’s approved regulatory coverage.

Waters of the State
Waters of the State are surface waters or groundwater within boundaries of the state as defined in Water Code section 13050(e), in which the State and Regional Water Boards have authority to protect beneficial uses. Waters of the State include, but are not limited to, groundwater aquifers, surface waters, saline waters, natural washes and pools, wetlands, sloughs, and estuaries, regardless of flow or whether water exists during dry conditions.

Waters of the State include waters of the United States.

Waters of the United States
Waters of the United States are surface waters or waterbodies that are subject to federal jurisdiction in accordance with the Clean Water Act.

Water Quality Objective
A water quality objective is the limit or maximum amount of pollutant, waste constituent or characteristic, or parameter level established in statewide water quality control plans and Regional Water Boards’ Basin Plans, for the reasonable protection of beneficial uses of surface waters and groundwater and the prevention of nuisance. 947
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT B – APPLICATION FOR ENROLLMENT December 6, 2022 B - 1
ATTACHMENT B – APPLICATION FOR ENROLLMENT

1. Enrollment Status: (Mark only one item)
☐ New Enrollee
☐ New Enrollee with previous regulatory coverage under Order 2006-0003-DWQ (that failed to certify continuation of coverage in CIWQS per Order 2022-XXXX-DWQ) Existing WDID Number: __________________________________________________

2. Applicant Information:

Legally Responsible Official Submitting Application
First and Last Name: ____________________________________________________ Title: _________________________________________________________________ Phone: _______________________________________________________________ Email: ________________________________________________________________ System Owner/Operator Name: ______________________________________________ Mailing Address:________________________________________________________ City, State, Zip:_________________________________________________________ County: _______________________________________________________________ Sanitary Sewer System Name: ____________________________________________ Regional Water Quality Control Board(s): ____________________________________ Signature and Date: _____________________________________________________

3. Applicant Type (Check one):
☐ City ☐ County ☐ State ☐ Federal ☐ Special District
☐ Government Combination ☐ Private ☐ Other Non-governmental Entity

4. Wastewater Treatment Plant Receiving Sanitary Sewer System Waste:

Wastewater Treatment Plant Permittee:________________________________________ WDID No.: ______________________________________________________________ 948
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT B – APPLICATION FOR ENROLLMENT December 6, 2022 B - 2

5. Billing Information
Billing Address: ___________________________________________________________ City, State, Zip: ___________________________________________________________ Billing Contact Person and Title: ______________________________________________ Phone and Email Address: __________________________________________________

6. Application Fee:

The application fee, as required by Water Code section 13260, is based on the daily population served by the sanitary sewer system. See updated Fee Schedule. (https://www.waterboards.ca.gov/resources/fees/water_quality/) Check one of the following and enter fee amount:
☐ Population Served < 50,000 – Total Fee submitted: $ ___________ ☐ Population Served ≥ 50,000 – Total Fee submitted: $ ___________ Make the fee payment payable to the State Water Resources Control Board and mail the complete application package to:

State Water Resources Control Board, Accounting Office
P. O. Box 1888
Sacramento, CA 95812-1888
Attention: Statewide Sanitary Sewer System Program

7. Application Submittal Certification
I certify under penalty of perjury under the laws of the State of California that to the best of my knowledge and belief, the information in the submitted application package is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment.

Print Name: ______________________________________________________________ Title: ___________________________________________________________________ Signature: __________________________________________Date: ________________ 949
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT C – NOTICE OF TERMINATION December 6, 2022
C - 1

ATTACHMENT C - NOTICE OF TERMINATION

1. Enrollee Information
Enrollee Name: ___________________________________________________________ WDID No:________________________________________________________________ Legally Responsible Official Requesting Termination of Coverage: ___________________ First and Last Name: ____________________________________________________ Title: _________________________________________________________________ Phone: _______________________________________________________________ Email: ________________________________________________________________ Mailing Address: __________________________________________________________ City, State, Zip: ___________________________________________________________ County: _________________________________________________________________ Sanitary Sewer System Name(s) or Unique Identifier(s): ___________________________ Regional Water Quality Control Board(s): _______________________________________ Signature and Date:________________________________________________________

2. Basis of Termination
Explanation of termination, including subsequent regulatory coverage and subsequent owner/operator of enrolled sanitary sewer system, as applicable:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ 950
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT C – NOTICE OF TERMINATION December 6, 2022
C - 2

3. Regulatory Coverage Termination Certification
I certify under penalty of perjury under the laws of the State of California that to the best of my knowledge: 1) the sanitary sewer system I officially represent is not required to be regulated under the Statewide Waste Discharge Requirements for Sanitary Sewer Systems Order 2022-XXXX-DWQ, and 2) the information submitted in this Notice of Termination is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment. Additionally, I understand that the submittal of this Notice of Termination does not release sanitary sewer system agencies from liability for any violations of the Clean Water Act.

Print Name: ______________________________________________________________ Title: ___________________________________________________________________ Signature: __________________________________________Date: ________________ For State Water Board Use Only
☐ Approved for Termination ☐ Denied and Returned to Enrollee Deputy Director of Water Quality Signature: _____________________________________ Date: ____________________Notice of Termination Effective Date: __________________ 951
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 1
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN – REQUIRED ELEMENTS Table of Contents

1. Sewer System Management Plan Goal And Introduction ............................................D-2

1.1. Regulatory Context ...........................................................................................D-2

1.2. Sewer System Management Plan Update Schedule.........................................D-3

1.3. Sewer System Asset Overview .........................................................................D-3

2. Organization ................................................................................................................D-3

3. Legal Authority.............................................................................................................D-4

4. Operation And Maintenance Program..........................................................................D-4

4.1. Updated Map of Sanitary Sewer System ..........................................................D-4

4.2. Preventive Operation and Maintenance Activities .............................................D-4

4.3. Training .............................................................................................................D-5

4.4. Equipment Inventory .........................................................................................D-5

5. Design And Performance Provisions ...........................................................................D-5

5.1. Updated Design Criteria and Construction Standards and Specifications.........D-5

5.2. Procedures and Standards................................................................................D-5

6. Spill Emergency Response Plan..................................................................................D-6

7. Sewer Pipe Blockage Control Program........................................................................D-7

8. System Evaluation, Capacity Assurance and Capital Improvements...........................D-7

8.1 System Evaluation and Condition Assessment.................................................D-7

8.2. Capacity Assessment and Design Criteria ........................................................D-8

8.3. Prioritization of Corrective Action ......................................................................D-9

8.4. Capital Improvement Plan.................................................................................D-9

9. Monitoring, Measurement and Program Modifications.................................................D-9

10. Internal Audits............................................................................................................D-10

11. Communication Program ...........................................................................................D-10 952
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 2
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN – REQUIRED ELEMENTS A Sewer System Management Plan (Plan) is a living planning document that documents ongoing local sewer system management program activities, procedures, and decision-making – at the scale necessary to address the size and complexity of the subject sanitary sewer system(s). This Plan may incorporate other programs and other plans by reference, to address short-term and long-term system resilience through:
• Proactive planning and decision-making;
• Local government ordinances;
• Updated operations and maintenance activities and procedures; • Implementation of capital improvements;
• Sufficient local budget to support staff resources, contractors, equipment, and training; and • Updated training of staff and contractors.

The Enrollee’s development, update, and implementation of a Sewer System Management Plan addressing the requirements of this Attachment is an enforceable component of this General Order. As specified in Provision 6.1 (Enforcement Provisions) of this General Order, consistent with the Water Code and the State Water Board Enforcement Policy, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts in implementing an effective Sewer System Management Plan to prevent, contain, control, and mitigate spills when considering Water Code section 13327 factors to determine necessary enforcement of this General Order.

This Attachment includes the following required elements that the Enrollee shall address in its Plan and subsequent updates. The Enrollee shall identify any requirement in this Attachment that is not applicable to the Enrollee’s sewer system and shall explain in its Plan why the requirement is not applicable.

1. SEWER SYSTEM MANAGEMENT PLAN GOAL AND INTRODUCTION
The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to: (1) properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s), (2) reduce and prevent spills, and (3) contain and mitigate spills that do occur.

The Plan must include a narrative Introduction section that discusses the following items:

1.1. Regulatory Context
The Plan Introduction section must provide a general description of the local sewer system management program and discuss Plan implementation and updates. 953
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 3

1.2. Sewer System Management Plan Update Schedule
The Plan Introduction section must include a schedule for the Enrollee to update the Plan, including the schedule for conducting internal audits. The schedule must include milestones for incorporation of activities addressing prevention of sewer spills.

1.3. Sewer System Asset Overview
The Plan Introduction section must provide a description of the Enrollee-owned assets and service area, including but not limited to:
• Location, including county(ies);
• Service area boundary;
• Population and community served;
• System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump stations and siphons; • Structures diverting stormwater to the sewer system;
• Data management systems;
• Sewer system ownership and operation responsibilities between Enrollee and private entities for upper and lower sewer laterals;
• Estimated number or percent of residential, commercial, and industrial service connections; and
• Unique service boundary conditions and challenge(s).

Additionally, the Plan Introduction section must provide reference to the Enrollee’s upto-date map of its sanitary sewer system, as required in section 4.1 (Updated Map of Sanitary Sewer System) of this Attachment.

2. ORGANIZATION
The Plan must identify organizational staffing responsible and integral for implementing the local Sewer System Management Plan through an organization chart or similar narrative documentation that includes:
• The name of the Legally Responsible Official as required in section 5.1 (Designation of a Legally Responsible Official) of this General Order; • The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements;
• Organizational lines of authority; and
• Chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. (For example, county 954
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 4
health officer, county environmental health agency, and State Office of Emergency Services.)

3. LEGAL AUTHORITY
The Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority to:
• Prevent illicit discharges into its sanitary sewer system from inflow and infiltration (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages;
• Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure; • Require that sewer system components and connections be properly designed and constructed;
• Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operated by the Enrollee;
• Enforce any violation of its sewer ordinances, service agreements, or other legally binding procedures; and
• Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.

4. OPERATION AND MAINTENANCE PROGRAM
The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.

4.1. Updated Map of Sanitary Sewer System
An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities within the sewer system service area boundaries.

4.2. Preventive Operation and Maintenance Activities
A scheduling system and a data collection system for preventive operation and maintenance activities conducted by staff and contractors.

The scheduling system must include:
• Inspection and maintenance activities;
955
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 5
• Higher-frequency inspections and maintenance of known problem areas, including areas with tree root problems;
• Regular visual and closed-circuit television (CCTV) inspections of manholes and sewer pipes.

The data collection system must document data from system inspection and maintenance activities, including system areas/components prone to root-intrusion potentially resulting in system backup and/or failure.

4.3. Training
In-house and external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors. The training must cover:
• The requirements of this General Order;
• The Enrollee’s Spill Emergency Response Plan procedures and practice drills; • Skilled estimation of spill volume for field operators; and • Electronic CIWQS reporting procedures for staff submitting data.

4.4. Equipment Inventory
An inventory of sewer system equipment, including the identification of critical replacement and spare parts.

5. DESIGN AND PERFORMANCE PROVISIONS
The Plan must include the following items as appropriate and applicable to the Enrollee’s system:

5.1. Updated Design Criteria and Construction Standards and Specifications Updated design criteria, and construction standards and specifications, for the construction, installation, repair, and rehabilitation of existing and proposed system infrastructure components, including but not limited to pipelines, pump stations, and other system appurtenances. If existing design criteria and construction standards are deficient to address the necessary component-specific hydraulic capacity as specified in section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of this Attachment, the procedures must include component-specific evaluation of the design criteria.

5.2. Procedures and Standards
Procedures, and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.
956
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 6

6. SPILL EMERGENCY RESPONSE PLAN
The Plan must include an up to date Spill Emergency Response Plan to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills. The Spill Emergency Response Plan must include procedures to:
• Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
• Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State;
• Comply with the notification, monitoring and reporting requirements of this General Order, State law and regulations, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
• Address emergency system operations, traffic control and other necessary response activities;
• Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
• Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
• Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters; • Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
• Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; • Conduct post-spill assessments of spill response activities; • Document and report spill events as required in this General Order; and • Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.
957
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 7

7. SEWER PIPE BLOCKAGE CONTROL PROGRAM
The Sewer System Management Plan must include procedures for the evaluation of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide justification in its Plan for why a program is not needed.

The procedures must include, at minimum:
• An implementation plan and schedule for a public education and outreach program that promotes proper disposal of pipe-blocking substances; • A plan and schedule for the disposal of pipe-blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of substances generated within a sanitary sewer system service area; • The legal authority to prohibit discharges to the system and identify measures to prevent spills and blockages;
• Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management practices requirements, recordkeeping and reporting requirements; • Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance;
• An identification of sanitary sewer system sections subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each section; and • Implementation of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above.

8. SYSTEM EVALUATION, CAPACITY ASSURANCE AND CAPITAL IMPROVEMENTS The Plan must include procedures and activities for:
• Routine evaluation and assessment of system conditions; • Capacity assessment and design criteria;
• Prioritization of corrective actions; and
• A capital improvement plan.

8.1 System Evaluation and Condition Assessment
The Plan must include procedures to:
• Evaluate the sanitary sewer system assets utilizing the best practices and technologies available;
958
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 8
• Identify and justify the amount (percentage) of its system for its condition to be assessed each year;
• Prioritize the condition assessment of system areas that:
o Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies; o Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas; o Are within the vicinity of a receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List;
• Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection methods;
• Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State;
• Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities; and
• Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to: sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.

8.2. Capacity Assessment and Design Criteria
The Plan must include procedures to identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key system elements for:
• Dry-weather peak flow conditions that cause or contributes to spill events; • The appropriate design storm(s) or wet weather events that causes or contributes to spill events;
• The capacity of key system components; and
• Identify the major sources that contribute to the peak flows associated with sewer spills.

The capacity assessment must consider:
• Data from existing system condition assessments, system inspections, system audits, spill history, and other available information; • Capacity of flood-prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions;
959
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 9
• Capacity of systems subject to increased infiltration and inflow due to larger and/or higher-intensity storm events as a result of climate change; • Increases of erosive forces in canyons and streams near underground and aboveground system components due to larger and/or higher-intensity storm events; • Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and • Necessary redundancy in pumping and storage capacities.

8.3. Prioritization of Corrective Action
The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions. Prioritization must consider the severity of the consequences of potential spills.

8.4. Capital Improvement Plan
The capital improvement plan must include the following items:
• Project schedules including completion dates for all portions of the capital improvement program;
• Internal and external project funding sources for each project; and • Joint coordination between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects; and Interagency coordination with other impacted utility agencies.

9. MONITORING, MEASUREMENT AND PROGRAM MODIFICATIONS
The Plan must include an Adaptive Management section that addresses Planimplementation effectiveness and the steps for necessary Plan improvement, including:
• Maintaining relevant information, including audit findings, to establish and prioritize appropriate Plan activities;
• Monitoring the implementation and measuring the effectiveness of each Plan Element;
• Assessing the success of the preventive operation and maintenance activities; • Updating Plan procedures and activities, as appropriate, based on results of monitoring and performance evaluations; and
• Identifying and illustrating spill trends, including spill frequency, locations and estimated volumes.
960
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 10

10. INTERNAL AUDITS
The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with section 5.4 (Sewer System Management Plan Audits) of this General Order.

11. COMMUNICATION PROGRAM
The Plan must include procedures for the Enrollee to communicate with:
• The public for:
o Spills and discharges resulting in closures of public areas, or that enter a source of drinking water, and
o The development, implementation, and update of its Plan, including opportunities for public input to Plan implementation and updates.
• Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for:
o System operation, maintenance, and capital improvement-related activities. 961
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 1
ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING AND

RECORDKEEPING REQUIREMENTS
Table of Contents

1. Notification Requirements......................................................................................... E1-3

1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services ...................................................................................... E1-3

1.2. Spill Notification Information........................................................................... E1-4

1.3. Notification of Spill Report Updates................................................................ E1-4

2. Spill-Specific Monitoring Requirements .................................................................... E1-5

2.1 Spill Location and Spread .............................................................................. E1-5

2.2 Spill Volume Estimation.................................................................................. E1-5

2.3. Receiving Water Monitoring ............................................................................E1-5

2.4. Safety and Access Exceptions ........................................................................E1-8

3. Reporting Requirements ............................................................................................E1-8

3.1. Reporting Requirements for Individual Category 1 Spill Reporting .................E1-8

3.2. Reporting Requirements for Individual Category 2 Spill Reporting ...............E1-12

3.3. Monthly Certified Spill Reporting for Category 3 Spills..................................E1-14

3.4. Monthly Certified Spill Reporting for Category 4 Spills..................................E1-16

3.5. Amended Certified Spill Reports for Category 3 Spills ..................................E1-16

3.6. Annual Certified Spill Reporting of Category 4 and/or Lateral Spills .............E1-16

3.7. Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” ................................................................................................E1-16

3.8. Electronic Sanitary Sewer System Service Area Boundary Map...................E1-17

3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ)..................................................................E1-17

3.10. Sewer System Management Plan Audit Reporting Requirements ................E1-19

3.11. Sewer System Management Plan Reporting Requirements .........................E1-19

4. Recordkeeping Requirements .................................................................................E1-20

4.1. Recordkeeping Time Period..........................................................................E1-20

4.2. Availability of Documents ..............................................................................E1-20

4.3. Spill Reports..................................................................................................E1-20

4.4. Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills .......E1-21

4.5. Sewer System Telemetry Records................................................................E1-22

4.6. Sewer System Management Plan Implementation Records .........................E1-22

4.7. Audit Records................................................................................................E1-23 962
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 2

4.8. Equipment Records.......................................................................................E1-23

4.9. Work Orders..................................................................................................E1-23 963
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 3
ATTACHMENT E1– NOTIFICATION, MONITORING, REPORTING AND RECORDKEEPING

REQUIREMENTS
The Notification Requirements (section 1), Spill-specific Monitoring Requirements (section 2), Reporting Requirements (section 3) and Recordkeeping Requirements (section 4) in this Attachment are pursuant to Water Code section 13267 and section 13383, and are an enforceable component of this General Order. For the purpose of this General Order, the term:
• Notification means the notifying of appropriate parties of a spill event or other activity. • Spill-specific Monitoring means the gathering of information and data for a specific spill event to be reported or kept as records.
• Reporting means the reporting of information and data into the online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database. • Recordkeeping means the maintaining of information and data in an official records storage system.

Failure to comply with the notification, monitoring, reporting and recordkeeping requirements in this General Order may subject the Enrollee to civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement.

Water Code section 13193 et seq. requires the Regional Water Quality Control Boards (Regional Water Boards) and the State Water Resources Control Board (State Water Board) to collect sanitary sewer spill information for each spill event and make this information available to the public. Sanitary sewer spill information for each spill event includes but is not limited to: Enrollee contact information for each spill event, spill cause, estimated spill volume and factors used for estimation, location, date, time, duration, amount discharged to waters of the State, response and corrective action(s) taken.

1. NOTIFICATION REQUIREMENTS

1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services
Per Water Code section 13271, for a spill that discharges in or on any waters of the State, or discharges or is deposited where it is, or probably will be, discharged in or on any waters of the State, the Enrollee shall notify the California Office of Emergency Services and obtain a California Office of Emergency Services Control Number as soon as possible but no later than two (2) hours after:
• The Enrollee has knowledge of the spill; and
• Notification can be provided without substantially impeding cleanup or other emergency measures.

The notification requirements in this section apply to individual spills of 1,000 gallons or greater, from an Enrollee-owned and/or operated laterals, to a water of the State. 964
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 4

1.2. Spill Notification Information
The Enrollee shall provide the following spill information to the California Office of Emergency Services before receiving a Control Number, as applicable:
• Name and phone number of the person notifying the California Office of Emergency Services;
• Estimated spill volume (gallons);
• Estimated spill rate from the system (gallons per minute); • Estimated discharge rate (gallons per minute) directly into waters of the State or indirectly into a drainage conveyance system;
• Spill incident description:
o Brief narrative of the spill event, and
o Spill incident location (address, city, and zip code) and closest cross streets and/or landmarks;
• Name and phone number of contact person on-scene;
• Date and time the Enrollee was informed of the spill event; • Name of sanitary sewer system causing the spill;
• Spill cause or suspected cause (if known);
• Amount of spill contained;
• Name of receiving water body receiving or potentially receiving discharge; and • Description of water body impact and/ or potential impact to beneficial uses.

1.3. Notification of Spill Report Updates
Following the initial notification to the California Office of Emergency Services and until such time that the Enrollee certifies the spill report in the online CIWQS Sanitary Sewer System Database, the Enrollee shall provide updates to the California Office of Emergency Services regarding substantial changes to:
• Estimated spill volume (increase or decrease in gallons initially estimated); • Estimated discharge volume discharged directly into waters of the State or indirectly into a drainage conveyance system (increase or decrease in gallons initially estimated); and
• Additional impact(s) to the receiving water(s) and beneficial uses. 965
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 5

2. SPILL-SPECIFIC MONITORING REQUIREMENTS

2.1 Spill Location and Spread
The Enrollee shall visually assess the spill location(s) and spread using photography, global positioning system (GPS), and other best available tools. The Enrollee shall document the critical spill locations, including:
• Photography and GPS coordinates for:
o The system location where spill originated.

For multiple appearance points of a single spill event, the points closest to the spill origin.
• Photography for:
o Drainage conveyance system entry locations,
o The location(s) of discharge into surface waters, as applicable, o Extent of spill spread, and
o The location(s) of clean up.

2.2 Spill Volume Estimation
To assess the approximate spill magnitude and spread, the Enrollee shall estimate the total spill volume using updated volume estimation techniques, calculations, and documentation for electronic reporting. The Enrollee shall update its notification and reporting of estimated spill volume (which includes spill volume recovered) as further information is gathered during and after a spill event.

2.3. Receiving Water Monitoring

2.3.1. Receiving Water Visual Observations
Through visual observations and use of best available spill volume-estimating techniques and field calculation techniques, the Enrollee shall gather and document the following information for spills discharging to surface waters:
• Estimated spill travel time to the receiving water;
• For spills entering a drainage conveyance system, estimated spill travel time from the point of entry into the drainage conveyance system to the point of discharge into the receiving water;
• Estimated spill volume entering the receiving water; and • Photography of:
o Waterbody bank erosion,
o Floating matter,
o Water surface sheen (potentially from oil and grease), 966
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 6
o Discoloration of receiving water, and
o Impact to the receiving water.

2.3.2. Receiving Water – Water Quality Sampling and Analysis For sewage spills in which an estimated 50,000 gallons or greater are discharged into a surface water, the Enrollee shall conduct the following water quality sampling no later than 18 hours after the Enrollee’s knowledge of a potential discharge to a surface water:
• Collect one water sample, each day of the duration of the spill, at:
o The DCS-001 location as described in section 2.3.4 (Receiving Water Sampling Locations) of this Attachment, if sewage discharges to a surface water via a drainage conveyance system; and/or
o Each of the three receiving water sampling locations in section 2.3.4 (Receiving Water Sampling Locations) of this Attachment;
If the receiving water has no flow during the duration of the spill, the Enrollee must report “No Sampling Due To No Flow” for its receiving water sampling locations.

The Enrollee shall analyze the collected receiving water samples for the following constituents per section 2.3.3 (Water Quality Analysis Specifications) of this Attachment:
• Ammonia, and
• Appropriate bacterial indicator(s) per the applicable Basin Plan water quality objectives, including one or more of the following, unless directed otherwise by the Regional Water Board:
o Total Coliform Bacteria
o Fecal Coliform Bacteria
o E-coli
o Enterococcus
Dependent on the receiving water(s), sampling of bacterial indicators shall be sufficient to determine post-spill (after the spill) compliance with the water quality objectives and bacterial standards of the California Ocean Plan or the California Inland Surface Water Enclosed Bays, and Estuaries Plan, including the frequency and/or number of post-spill receiving water samples as may be specified in the applicable plans.

The Enrollee shall collect and analyze additional samples as required by the applicable Regional Water Board Executive Officer or designee.
967
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 7

2.3.3. Water Quality Analysis Specifications
Spill monitoring must be representative of the monitored activity (40 Code of Federal Regulations section 122.41(j)(1)).

Sufficiently Sensitive Methods
Sample analysis must be conducted according to sufficiently sensitive test methods approved under 40 Code of Federal Regulations Part 136 for the sample analysis of pollutants. For the purposes of this General Order, a method is sufficiently sensitive when the minimum level of the analytical method approved under 40 Code of Federal Regulations Part 136 is at or below the receiving water pollutant criteria.

Environmental Laboratory Accreditation Program-Accredited Laboratories The analysis of water quality samples required per this General Order must be performed by a laboratory that has accreditation pursuant to Article 3 (commencing with section 100825) of Chapter 4 of Part 1 of Division 101 of the Health and Safety Code. (Water Code section 13176(a).) The State Water Board accredits laboratories through its Environmental Laboratory Accreditation Program (ELAP).

2.3.4. Receiving Water Sampling Locations
The Enrollee shall collect receiving water samples at the following locations.

Sampling of Flow in Drainage Conveyance System (DCS) Prior to Discharge Sampling
Location Sampling Location Description
DCS-001 A point in a drainage conveyance system before the drainage conveyance system flow discharges into a receiving water.

Receiving Surface Water Sampling (RSW)1
Sampling
Location Sampling Location Description
RSW-001
Point of Discharge
A point in the receiving water where sewage initially enters the receiving water.

RSW-001U:

Upstream of Point
of Discharge
A point in the receiving water, upstream of the point of sewage discharge, to capture ambient conditions absent of sewage discharge impacts.
968
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 8
Sampling
Location Sampling Location Description
RSW-001D:

Downstream of
Point of Discharge
A point in the receiving water, downstream of the point of sewage discharge, where the spill material is fully mixed with the receiving water.
1 The Enrollee must use its best professional judgment to determine the upstream and downstream distances based on receiving water flow, accessibility to upstream/downstream waterbody banks, and size of visible sewage plume.

2.4. Safety and Access Exceptions
If the Enrollee encounters access restrictions or unsafe conditions that prevents its compliance with spill response requirements or monitoring requirements in this General Order, the Enrollee shall provide documentation of access restrictions and/or safety hazards in the corresponding required report.

3. REPORTING REQUIREMENTS
All reporting required in this General Order must be submitted electronically to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov), unless specified otherwise in this General Order. Electronic reporting may solely be conducted by a Legally Responsible Official or Data Submitter(s) previously designated by the Legally Responsible Official, as required in section 5.8 (Designation of Data Submitters) of this General Order.

The Enrollee shall report any information that is protected by the Homeland Security Act, by email to [email protected], with a brief explanation of the protection provided by the Homeland Security Act for the subject report to be protected from unauthorized disclosure and/or public access, and for official Water Board regulatory purposes only.

3.1. Reporting Requirements for Individual Category 1 Spill Reporting

3.1.1. Draft Spill Report for Category 1 Spills
Within three (3) business days of the Enrollee’s knowledge of a Category 1 spill, the Enrollee shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;
969
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 9

5. Estimated spill start date and time;

6. Date and time the Enrollee notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated;
o If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry location(s); o Estimated spill volume fully recovered from the drainage conveyance system; o Estimated spill volume remaining within the drainage conveyance system;

11. Description and photographs of all discharge point(s) into the surface water;

12. Estimated spill volume that discharged to surface waters; and

13. Estimated total spill volume recovered.

3.1.2. Certified Spill Report for Category 1 Spills
Within 15 calendar days of the spill end date, the Enrollee shall submit a Certified Spill Report for Category 1 spills, to the online CIWQS Sanitary Sewer System Database.

Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section 3.1.1 (Draft Spill Report for Category 1 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
o The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;
970
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 10

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, lateral, pump station, etc.);

6. Description of the pipe material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was associated with a storm event;

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion;

14. Name and type of receiving water body(s);

15.Description of the water body(s), including but not limited to:
o Observed impacts on aquatic life,
o Public closure, restricted public access, temporary restricted use, and/or posted health warnings due to spill,
o Responsible entity for closing/restricting use of water body, and o Number of days closed/restricted as a result of the spill.

16.Whether or not the spill was located within 1,000 feet of a municipal surface water intake; and

17. If water quality samples were collected, identify sample locations and the parameters the water quality samples were analyzed for. If no samples were taken, Not Applicable shall be selected.

3.1.3. Spill Technical Report for Individual Category 1 Spill in which 50,000 Gallons or Greater Discharged into a Surface Water
For any spill in which 50,000 gallons or greater discharged into a surface water, within 45 calendar days of the spill end date, the Enrollee shall submit a Spill Technical Report to the online CIWQS Sanitary Sewer System Database. The Spill Technical Report, at minimum, must include the following information:

1. Spill causes and circumstances, including at minimum:
o Complete and detailed explanation of how and when the spill was discovered; 971
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 11
o Photographs illustrating the spill origin, the extent and reach of the spill, drainage conveyance system entrance and exit, receiving water, and post-cleanup site conditions;
o Diagram showing the spill failure point, appearance point(s), the spill flow path, and ultimate destinations;
o Detailed description of the methodology employed, and available data used to calculate the discharge volume and, if applicable, the recovered spill volume; o Detailed description of the spill cause(s);
o Description of the pipe material, and estimated age of the pipe material, at the failure location;
o Description of the impact of the spill;
o Copy of original field crew records used to document the spill; and o Historical maintenance records for the failure location.

2. Enrollee’s response to the spill:
o Chronological narrative description of all actions taken by the Enrollee to terminate the spill;
o Explanation of how the Sewer System Management Plan Spill Emergency Response Plan was implemented to respond to and mitigate the spill; and o Final corrective action(s) completed and a schedule for planned corrective actions, including:
▪ Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable,
▪ Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences, and ▪ Necessary modifications to the Emergency Spill Response Plan to incorporate lessons learned in responding to and mitigating the spill.

3. Water Quality Monitoring, including at minimum:
o Description of all water quality sampling activities conducted; o List of pollutant and parameters monitored, sampled and analyzed; as required in section 2.3 (Receiving Water Monitoring) of this Attachment; o Laboratory results, including laboratory reports;
o Detailed location map illustrating all water quality sampling points; and o Other regulatory agencies receiving sample results (if applicable).

4. Evaluation of spill impact(s), including a description of short-term and long-term impact(s) to beneficial uses of the surface water.
972
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 12

3.1.4. Amended Certified Spill Reports for Individual Category 1 Spills The Enrollee shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database.

The Enrollee shall certify the amended report.

After 90 calendar days, the Enrollee shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

3.2. Reporting Requirements for Individual Category 2 Spill Reporting

3.2.1. Draft Spill Report for Category 2 Spills
Within three (3) business days of the Enrollee’s knowledge of a Category 2 spill, the Enrollee shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Date and time the Enrollee notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated;
If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry location(s); o Estimated spill volume fully recovered from the drainage conveyance system; o Estimated spill volume remaining within the drainage conveyance system; 973
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 13
o Estimated spill volume discharged to a groundwater infiltration basin or facility, if applicable; and

11. Estimated total spill volume recovered.

3.2.2. Certified Spill Report for Category 2 Spills
Within 15 calendar days of the spill end date, the Enrollee shall submit a Certified Spill Report for the Category 2 spill, to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov). Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section 3.2.1 (Draft Spill Report for Category 2 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
o The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, pump station, etc.);

6. Description of the pipe/infrastructure material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was associated with a storm event;

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion; and
974
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 14

14. Whether or not the spill was located within 1,000 feet of a municipal surface water intake.

3.2.3. Amended Certified Spill Reports for Individual Category 2 Spills The Enrollee shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database.

The Enrollee shall certify the amended report.

After 90 calendar days, the Enrollee shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

3.3. Monthly Certified Spill Reporting for Category 3 Spills The Enrollee shall report and certify all Category 3 spills to the online CIWQS Sanitary Sewer System Database within 30 calendar days after the end of the month in which the spills occurred. (For example, all Category 3 spills occurring in the month of February shall be reported and certified by March 30th). After the Legally Responsible Official certifies the spills, the online CIWQS Sanitary Sewer System Database will issue a spill event identification number for each spill.

The monthly reporting of all Category 3 spills must include the following items for each spill:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Description, photographs, and GPS coordinates where the spill originated:
o If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

7. Estimated total spill volume exiting the system;

8. Description and photographs of the extent of the spill and spill boundaries;

9. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry locations(s); o Estimated spill volume fully recovered from the drainage conveyance system; and 975
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 15
o Estimated spill volume discharged to a groundwater infiltration basis or facility, if applicable.

10. Estimated total spill volume recovered;

11. Description of the spill event destination(s), including GPS coordinates, if available, that represent the full spread and reaches of the spill;

12. Spill end date and time;

13. Description of how the spill volume estimations were calculated, including, at minimum:
o The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology and type of data relied upon to estimate the spill start time, on-going spill rate at time of arrival (if applicable), and the spill end time;

14. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

15. System failure location (for example, main, pump station, etc.);

16. Description of the pipe/infrastructure material, and estimated age of the pipe/infrastructure material, at the failure location;

17. Description of the impact of the spill;

18. Whether or not the spill was associated with a storm event;

19. Description of spill response activities including description of immediate spill containment and cleanup efforts;

20. Description of spill corrective actions, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of the major milestones for those steps; including, at minimum:
o Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable, and
o Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences at the same spill event location, including:
▪ Adjusted schedule/method of preventive maintenance,
▪ Planned rehabilitation or replacement of sanitary sewer asset, ▪ Inspected, repaired asset(s), or replaced defective asset(s), ▪ Capital improvements,
▪ Documentation verifying immediately implemented system modifications and operating/maintenance modifications,
▪ Description of spill response activities,
976
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 16
▪ Spill response completion date, and
▪ Ongoing investigation efforts, and expected completion date of investigation to determine the full cause of spill;

21. Detailed narrative of investigation and investigation findings of cause of spill.

3.4. Monthly Certified Spill Reporting for Category 4 Spills The Enrollee shall report and certify the estimated total spill volume exiting the sanitary sewer system, and the total number of all Category 4 spills to the online CIWQS Sanitary Sewer System Database, within 30 calendar days after the end of the month in which the spills occurred.

3.5. Amended Certified Spill Reports for Category 3 Spills Within 90 calendar days of the certified Spill Report due date, the Enrollee may update or add additional information to a certified Spill Report by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The Enrollee shall certify the amended report.

After 90 calendar days, the Legally Responsible Official shall contact the State Water Board at [email protected] to request to amend a certified Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the 90-day timeframe for amending the certified Spill Report, as provided above.

3.6. Annual Certified Spill Reporting of Category 4 and/or Lateral Spills For all Category 4 spills and spills from its owned and/or operated laterals that are caused by a failure or blockage in the lateral and that do not discharge to a surface water, the Enrollee shall:
• Maintain records per section 4.4. of this Attachment; The Enrollee shall provide records upon request by State Water Board or Regional Water Board staff.
• Annually upload and certify a report, in an appropriate digital format, of all recordkeeping of spills to the online CIWQS Sanitary Sewer System Database, by February 1st after the end of the calendar year in which the spills occurred.

A spill from an Enrollee-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the Enrollee shall report all Category 1 spills per section 3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

3.7. Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills”
If either (1) no spills occur during a calendar month or (2) only Category 4, and/or Enrollee-owned and/or operated lateral spills (that do not discharge to a surface water) occur during a calendar month, the Enrollee shall certify, within 30 calendar days after 977
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 17
the end of each calendar month, either a “No-Spill” certification statement, or a “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” certification statement, in the online CIWQS Sanitary Sewer System Database, certifying that there were either no spills, or Category 4 and/or Non-Category 1 Lateral Spills that will be reported annually (per section 3.6 of this Attachment) for the designated month.

If a spill starts in one calendar month and ends in a subsequent calendar month, and the Enrollee has no further spills of any category, in the subsequent calendar month, the Enrollee shall certify “no-spills” for the subsequent calendar month.

If the Enrollee has no spills from its systems during a calendar month, but the Enrollee voluntarily reported a spill from a private lateral or a private system, the Enrollee shall certify “no-spills” for that calendar month.

If the Enrollees has spills from its owned and/or operated laterals during a calendar month, the Enrollee shall not certify “no spills” for that calendar month.

3.8. Electronic Sanitary Sewer System Service Area Boundary Map The Legally Responsible Official shall submit, to the State Water Board, an up-to-date electronic spatial map of its sewer system service area boundaries. The map must be in accordance with section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of this General Order and the specification provided on the statewide Sanitary Sewer Systems program website. The map must include the location of wastewater treatment facility(ies) that treats the sewer system waste, if in the same sewer service boundary.

By the Effective Date of this General Order, specifications for the electronic sanitary sewer service area boundary map format will be provided on the statewide Sanitary Sewer Systems Order program website.

3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ)
A new Enrollee shall complete and submit its first certified Annual Report into the online CIWQS Sanitary Sewer System Database, within 30 days of obtaining a CIWQS account; Subsequent Annual Reports are due by April 1 of each year.

All enrollees shall update their previous year’s Annual Report, by April 1 of each year after the Effective Date of this General Order, for each calendar year (January 1 through December 31).

The Annual Report must be entered directly into the online CIWQS Sanitary Sewer System Database. The Enrollee’s Legally Responsible Official shall certify the Annual Report as instructed in CIWQS;
The Annual Report must address, and update as applicable, the following items:
• Population served;
978
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 18
• Updated sewer system service area boundary map, if service area boundary has changed from original map submitted per section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of this General Order; • Number of system operation and maintenance staff:
o Entry level (less than two years of experience),
o Journey level (greater than two years of experience), o Supervisory level, and
o Managerial level;
• Number of operation and maintenance staff certified as a certified collection system operator by the California Water Environmental Association (CWEA), with:
o Corresponding number of certified collection system operator grade levels (Grade I, II, III, IV, and V);
• System information:
o Miles of system gravity and force mains,
o Number of upper and lower service laterals connected to system, o Estimated number of upper and lower laterals owned and/or operated by the Enrollee,
o Portion of laterals that is Enrollee’s responsibility, o Average age the major components of system infrastructure, o Number and age of pump stations, and
o Estimated total miles of the system pipeline not accessible for maintenance; • Name and location of the treatment plant(s) receiving sanitary sewer system’s waste;
• Name of satellite sewer system tributaries;
• Number of system’s gravity sewer above or underground crossings of water bodies throughout system;
• Number of force main (pressurized pipe) above or underground crossings of water bodies throughout system;
• Number of siphons used to convey waste throughout the sewer system; • Miles of sewer system cleaned;
• Miles of sewer system video inspected, or comparable (i.e., video closed-circuit television or alternative inspection methods);
• System Performance Evaluation as specified in section 5.11 (System Performance Analysis) of this General Order;
• Major spill causes (for example, root intrusion, grease deposition); 979
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 19
• System infrastructure failure points (for example, main, pump station, lateral, etc.); • Ongoing spill investigations; and
• Actions taken to address system deficiencies.

3.10. Sewer System Management Plan Audit Reporting Requirements The Enrollee shall submit its Sewer System Management Plan Audit and other pertinent audit information, in accordance with section 5.4 (Sewer System Management Plan Audits) of this General Order, to the online CIWQS Sanitary Sewer System Database by six (6) months after the end of the 3-year audit period.

If a Sewer System Management Plan Audit is not conducted as required: the Enrollee shall:
• Update the online CIWQS Sanitary Sewer System Database and select the justification for not conducting the Audit; and
• Notify its corresponding Regional Water Board (see Attachment F (Regional Water Quality Control Board Contact Information)) of the justification for the lapsed requirements.

The Enrollee’s reporting of a justification for not conducting a timely Audit does not justify non-compliance with this General Order. The Enrollee shall:
• Submit the late Audit as required in this General Order; and • Comply with subsequent Audit requirements and due dates corresponding with the original audit cycle.

3.11. Sewer System Management Plan Reporting Requirements For an Existing Enrollee previously regulated by Order 2006-0003-DWQ: Within every six (6) years after the required due date of its last Plan Update, the Legally Responsible Official shall upload and certify a local governing entity-approved Sewer System Management Plan Update to the online CIWQS Sanitary Sewer System Database. If the electronic document format or size capacity prevents the electronic upload of the Plan, the Legally Responsible Official shall report an electronic link to its updated Sewer System Management Plan posted on its own website.

Order 2006-0003-DWQ required each enrollee to develop its initial Sewer System Management Plan per the following schedule, with required Plan updates at a frequency of 5-years thereafter:

Systems serving populations: Greater than 100,000: May 2, 2009 Between 100,000 and 10,000: August 2, 2009
Between 10,000 and 2,500: May 2, 2010
Less than 2,500: August 2, 2010
980
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 20
This Order carries forth the previously-required Plan Update schedule per Order 2006-0003-DWQ. Per the six-year Plan Update frequency required in this Order, the Enrollee shall upload and certify its first Plan Update, to the online CIWQS Sanitary Sewer System Database by the following due dates, with subsequent Plan Updates at the frequency of six years thereafter:

Systems serving populations: Greater than 100,000: May 2, 2025 Between 100,000 and 10,000: August 2, 2025
Between 10,000 and 2,500: May 2, 2026
Less than 2,500: August 2, 2026
For a New Enrollee: Within twelve (12) months of its Application for Enrollment Approval date, the Legally Responsible Official of a new Enrollee shall upload and certify a local governing entity-approved Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database. If electronic document format or size capacity prevents the electronic upload of the Plan, the Legally Responsible Official shall report an electronic link to its Sewer System Management Plan posted on its own website. The due date for subsequent 6-year Plan updates, is six (6) years from the submittal due date of the new Enrollee’s first Sewer System Management Plan.

4. RECORDKEEPING REQUIREMENTS
The Enrollee shall maintain records to document compliance with the provisions of this General Order, and previous General Order 2006-0003-DWQ as applicable, for each sanitary sewer system owned, including any required records generated by an Enrollee’s contractor(s).

4.1. Recordkeeping Time Period
The Enrollee shall maintain records of documents required in this Attachment, including records collected for compliance with this General Order, and records collected in accordance with previous General Order 2006-0003-DWQ, for five (5) years.

4.2. Availability of Documents
The Enrollee shall make the records required in this General Order readily available, either electronic or hard copies, for review by Water Board staff during onsite inspections or through an information request.

4.3. Spill Reports
The Enrollee shall maintain records for each of the following spill-related events and activities:
• Spill event complaint, including but not limited to records documenting how the Enrollee responded to notifications of spills. Each complaint record must, at a minimum, include the following information:
o Date, time, and method of notification,
981
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 21
o Date and time the complainant first noticed the spill, if available, o Narrative description of the complaint, including any information the caller provided regarding whether the spill has reached surface waters or a drainage conveyance system, if available,
o Complainant’s contact information, if available, and
o Final resolution of the complaint;
• Records documenting the steps and/or remedial action(s) undertaken by the Enrollee, using all available information, to comply with this General Order, and previous General Order 2006-0003-DWQ as applicable;
• Records documenting how estimate(s) of volume(s) and, if applicable, volume(s) of spill recovered were calculated;
• All California Office of Emergency Services notification records, as applicable; and • Records, in accordance with the Monitoring Requirements in this Attachment.

4.4. Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills An Enrollee must maintain the following records for each individual Category 4 spill and for each individual non-Category 1 Enrollee-owned and/or operated lateral spill, and report in accordance to section 3.6 (Annual Certified Spill Reporting of Category 4 and/or Lateral Spills) of this Attachment.

Recordkeeping of Individual Category 4 Spill Information:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Description and GPS coordinates for the system location where the spill originated;

4. Did the spill reach a drainage conveyance system? If Yes:
o Description of drainage conveyance system location,
o Estimated spill volume fully recovered within the drainage conveyance system, and
o Estimated spill volume remaining within the drainage conveyance system;

5. Estimated total spill volume exiting the sanitary sewer system;

6. Spill date and start time;

7. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

8. System failure location (for example, main, pump station, etc.);

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of how the volume estimation was calculated, including, at minimum:
982
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 22
o The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology and type of data relied upon to estimate the spill start time, ongoing spill rate at time of arrival (if applicable), and the spill end time;

11. Description of implemented system modifications and operating/maintenance modifications.

Recordkeeping of Individual Lateral Spill Information:

1. Date and time the Enrollee was notified of, or self-discovered, the spill;

2. Location of individual spill;

3. Estimated individual spill volume;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.); and

5. Description of how the volume estimations were calculated.

Total Annual Spill Information:

1. Estimated total annual spill volume;

2. Description of spill corrective actions, including at minimum:
o Local regulatory enforcement action taken against the sewer lateral owner in response to a spill, as applicable, and
o System operation, maintenance and program modifications implemented to prevent repeated spill occurrences at the same spill location.

4.5. Sewer System Telemetry Records
The Enrollee shall maintain the following sewer system telemetry records if used to document compliance with this General Order, and previous General Order 2006-0003-DWQ as applicable, including spill volume estimates:
• Supervisory control and data acquisition (SCADA) system(s); • Alarm system(s);
• Flow monitoring device(s) or other instrument(s) used to estimate sewage flow rates, and/or volumes;
• Computerized maintenance management system records; and • Asset management-related records.

4.6. Sewer System Management Plan Implementation Records The Enrollee shall maintain records documenting the Enrollee’s implementation of its Sewer System Management Plan, including documents supporting its Sewer System Management Plan audits, corrections, modifications, and updates to the Sewer System Management Plan.
983
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 23

4.7. Audit Records
The Enrollee shall maintain, at minimum, the following records pertaining to its Sewer System Management Plan audits, and other internal audits:
• Completed audit documents and findings;
• Name and contact information of staff and/or consultants that conducted or involved in the audit; and
• Follow-up actions based on audit findings.

4.8. Equipment Records
The Enrollee shall maintain a log of all owned and leased sewer system cleaning, operational, maintenance, construction, and rehabilitation equipment.

4.9. Work Orders
The Enrollee shall maintain record of work orders for operations and maintenance projects.
984
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 1
ATTACHMENT E2 – SUMMARY OF NOTIFICATION, MONITORING AND REPORTING

REQUIREMENTS
This Attachment provides a summary of notification, monitoring and reporting requirements, by spill category, and for Enrollee-owned and/or operated laterals as required in Attachment E1 of this General Order, for quick reference purposes only.

Table E2-1
Spill Category 1: Spills to Surface Waters
Spill
Requirement Due Method
Notification
Within two (2) hours of the Enrollee’s knowledge of
a Category 1 spill of 1,000 gallons or greater,
discharging or threatening to discharge to surface
waters:

Notify the California Office of Emergency Services
and obtain a notification control number.

California Office
of Emergency
Services at:
(800) 852-7550
(Section 1 of
Attachment E1)
Monitoring
• Conduct spill-specific monitoring;
• Conduct water quality sampling of the receiving
water within 18 hours of initial knowledge of spill of
50,000 gallons or greater to surface waters.
(Section 2 of
Attachment E1)
Reporting
• Submit Draft Spill Report within three (3)
business days of the Enrollee’s knowledge of the
spill;
• Submit Certified Spill Report within 15 calendar
days of the spill end date;
• Submit Technical Report within 45 calendar days
after the spill end date for a Category 1 spill in
which 50,000 gallons or greater discharged to
surface waters; and
• Submit Amended Spill Report within 90 calendar
days after the spill end date.
(Section 3.1 of
Attachment E1)
985
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 2
Table E2-2
Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface Waters
Spill
Requirements Due Method
Notification
Within two (2) hours of the Enrollee’s knowledge of
a Category 2 spill of 1,000 gallons or greater,
discharging or threatening to discharge to waters of
the State:

Notify California Office of Emergency Services and
obtain a notification control number.

California Office of
Emergency
Services at: (800)
852-7550
(Section 1 of
Attachment E1)
Monitoring Conduct spill-specific monitoring.
(Section 2 of
Attachment E1)
Reporting
• Submit Draft Spill Report within three (3)
business days of the Enrollee’s knowledge of the
spill;
• Submit Certified Spill Report within 15 calendar
days of the spill end date; and
• Submit Amended Spill Report within 90 calendar
days after the spill end date.
(Section 3.2 of
Attachment E1)
986
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 3
Table E2-3
Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons That Does Not Discharge to Surface Waters
Spill
Requirements Due Method
Notification Not Applicable Not Applicable
Monitoring Conduct spill-specific monitoring. (Section 2 of Attachment E1)
Reporting
• Submit monthly Certified Spill Report to the online
CIWQS Sanitary Sewer System Database within
30 calendars days after the end of the month in
which the spills occur; and
• Submit Amended Spill Reports within 90 calendar
days after the Certified Spill Report due date.
(Section 3.3 and 3.5 of
Attachment E1)
Table E2-4
Spill Category 4: Spills Less Than 50 Gallons That Do Not Discharge to Surface Waters Spill
Requirements Due Method
Notification Not Applicable Not Applicable
Monitoring Conduct spill-specific monitoring.
(Section 2 of Attachment
E1)
Reporting
• If, during any calendar month, Category 4 spills
occur, certify monthly, the estimated total spill
volume exiting the sanitary sewer system, and the
total number of all Category 4 spills into the online
CIWQS Sanitary Sewer System Database, within
30 days after the end of the calendar month in
which the spills occurred.
• Upload and certify a report, in an acceptable digital format, of all Category 4 spills to the online CIWQS
Sanitary Sewer System Database, by February 1st
after the end of the calendar year in which the
spills occur.
(Section 3.4, 3.6, 3.7
and 4.4 of Attachment
E1)
987
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 4
Table E2-5
Enrollee Owned and/or Operated Lateral Spills That Do Not Discharge to Surface Waters Spill
Requirements Due Method
Notification
Within two (2) hours of the Enrollee’s knowledge of a
spill of 1,000 gallons or greater, from an enrolleeowned and/or operated lateral, discharging or threatening to discharge to waters of the State:

Notify California Office of Emergency Services and
obtain a notification control number.

Not applicable to a spill of less than 1,000 gallons.

California Office of
Emergency Services
at: (800) 852-7550
(Section 1 of Attachment
E1)
Monitoring Conduct visual monitoring. (Section 2 of Attachment E1)
Reporting
• Upload and certify a report, in an acceptable digital format, of all lateral spills (that do not discharge to a surface water) to the online CIWQS Sanitary
Sewer System Database, by February 1st after the
end of the calendar year in which the spills occur.
• Report a lateral spill of any volume that discharges
to a surface water as a Category 1 spill.
(Sections 3.6, 3.7 and

4.4 of Attachment E1)
988
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT F – REGIONAL WATER QUALITY CONTROL December 6, 2022

BOARD CONTACT INFORMATION
F - 1
ATTACHMENT F – REGIONAL WATER QUALITY CONTROL BOARD CONTACT

INFORMATION
This Attachment provides a map, list of counties, and contact information to assist the Enrollee in identifying the corresponding Regional Water Quality Control Board office, for all Regional Water Board notification requirements in this General Order.

Region 1 -- North Coast Regional Water Quality Control Board:

Del Norte, Glenn, Humboldt, Lake, Marin, Mendocino, Modoc, Siskiyou, Sonoma, and Trinity counties.

[email protected] or (707) 576-2220
Region 2 -- San Francisco Bay Regional Water Quality Control Board:

Alameda, Contra Costa, San Francisco, Santa Clara (Northern most part of Morgan Hill), San Mateo, Marin, Sonoma, Napa, Solano counties.

[email protected] or (510) 622-2369
Region 3 -- Central Coast Regional Water Quality Control Board:

Santa Clara (most of Morgan Hill), San Mateo (Southern portion), Santa Cruz, San Benito, Monterey, Kern (small portions), San Luis Obispo, Santa Barbara, Ventura (Northern portion) counties.

[email protected] or (805) 549-3147
Region 4 -- Los Angeles Regional Water Quality Control Board:

Los Angeles, Ventura counties (small portions of Kern and Santa Barbara counties). [email protected] or (213) 576-6600
989
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT F – REGIONAL WATER QUALITY CONTROL December 6, 2022

BOARD CONTACT INFORMATION
F - 2
Region 5 -- Central Valley Regional Water Quality Control Board:

Rancho Cordova (Sacramento) Office: Colusa, Lake, Sutter, Yuba, Sierra, Nevada, Placer, Yolo, Napa, (North East), Solano (West), Sacramento, El Dorado, Amador, Calaveras, San Joaquin, Contra Costa (East), Stanislaus, Tuolumne counties.

[email protected] or (916) 464-3291 Fresno Office: Fresno, Kern, Kings, Madera, Mariposa, Merced, and Tulare counties, and small portions of San Benito and San Luis Obispo counties.

[email protected] or (559) 445-5116 Redding Office: Butte, Glen, Lassen, Modoc, Plumas, Shasta, Siskiyou, and Tehama counties.

[email protected] or (530) 224-4845 Region 6 -- Lahontan Regional Water Quality Control Board:

Lake Tahoe Office: Alpine, Modoc (East), Lassen (East side and Eagle Lake), Sierra, Nevada, Placer, El Dorado counties.

[email protected] or (530) 542-5400 Victorville Office: Mono, Inyo, Kern (East), San Bernardino, Los Angeles (North East corner) counties.

[email protected] or (760) 241-6583 Region 7 -- Colorado River Basin Regional Water Quality Control Board:

Imperial county and portions of San Bernardino, Riverside, San Diego counties.

[email protected] or (760) 346-7491
Region 8 -- Santa Ana Regional Water Quality Control Board:

Orange, Riverside, San Bernardino counties.

[email protected] or (951) 782-4130
Region 9 -- San Diego Regional Water Quality Control Board:

San Diego county and portions of Orange and Riverside counties.

[email protected] or (619) 516-1990
End of Order 2022-0103-DWQ
990
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT B – APPLICATION FOR ENROLLMENT December 6, 2022 B - 1
ATTACHMENT B – APPLICATION FOR ENROLLMENT

1. Enrollment Status: (Mark only one item)
☐ New Enrollee
☐ New Enrollee with previous regulatory coverage under Order 2006-0003-DWQ (that failed to certify continuation of coverage in CIWQS per Order 2022-XXXX-DWQ) Existing WDID Number: __________________________________________________

2. Applicant Information:

Legally Responsible Official Submitting Application
First and Last Name: ____________________________________________________ Title: _________________________________________________________________ Phone: _______________________________________________________________ Email: ________________________________________________________________ System Owner/Operator Name: ______________________________________________ Mailing Address:________________________________________________________ City, State, Zip:_________________________________________________________ County: _______________________________________________________________ Sanitary Sewer System Name: ____________________________________________ Regional Water Quality Control Board(s): ____________________________________ Signature and Date: _____________________________________________________

3. Applicant Type (Check one):
☐ City ☐ County ☐ State ☐ Federal ☐ Special District
☐ Government Combination ☐ Private ☐ Other Non-governmental Entity

4. Wastewater Treatment Plant Receiving Sanitary Sewer System Waste:

Wastewater Treatment Plant Permittee:________________________________________ WDID No.: ______________________________________________________________ Perry Gerdes
Water/Wastewater Superintendent
951-849-3273
[email protected]
Colorado River Basin
755010507
City of Banning
P.O. Box 998
Banning, CA 92220
Riverside
City of Banning Collection System
City of Banning Water Reclamation Facility
7A330100015
991
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT B – APPLICATION FOR ENROLLMENT December 6, 2022 B - 2

5. Billing Information
Billing Address: ___________________________________________________________ City, State, Zip: ___________________________________________________________ Billing Contact Person and Title: ______________________________________________ Phone and Email Address: __________________________________________________

6. Application Fee:

The application fee, as required by Water Code section 13260, is based on the daily population served by the sanitary sewer system. See updated Fee Schedule. (https://www.waterboards.ca.gov/resources/fees/water_quality/) Check one of the following and enter fee amount:
☐ Population Served < 50,000 – Total Fee submitted: $ ___________ ☐ Population Served ≥ 50,000 – Total Fee submitted: $ ___________ Make the fee payment payable to the State Water Resources Control Board and mail the complete application package to:

State Water Resources Control Board, Accounting Office
P. O. Box 1888
Sacramento, CA 95812-1888
Attention: Statewide Sanitary Sewer System Program

7. Application Submittal Certification
I certify under penalty of perjury under the laws of the State of California that to the best of my knowledge and belief, the information in the submitted application package is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment.

Print Name: ______________________________________________________________ Title: ___________________________________________________________________ Signature: __________________________________________Date: ________________ $3,453.00
Pery Gerdes
Water/Wastewater Superintendent
P.O. Box 998
Banning, CA 92220
Perry Gerdes
951-849-3273, [email protected]
992
State Water Resources Control Board
August 9, 2023
Perry Gerdes
City of Banning
P.O. Box 998
Banning, CA 92220
NOTICE OF APPLICABILITY; NEW REGULATORY COVERAGE; STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER, 2022-0103-DWQ
Dear Perry Gerdes:

Thank you for submitting the July 6, 2023, application package requesting regulatory coverage for the City of Banning under the Statewide General Order for Sanitary Sewer Systems.1 The application package is approved. This Notice of Applicability serves as confirmation of new regulatory coverage under the Statewide General Order 2022-0103-DWQ, as follows:
• Agency name: City of Banning
• Sanitary Sewer System name:Banning City CS
• Waste Discharge Identification Number (WDID):7SSO20023 • Regulatory Coverage Start Date:August 9, 2023
To comply with the Statewide General Order for Sanitary Sewer Systems, the City of Banning shall:
a. Designate a Legally Responsible Official, per Section 5.1 of the General Order. b. Within 30 days from the date of this letter, obtain a California Integrated Water Quality System (CIWQS) user account per Section 2.2.3 of the General Order. c. Within 12 months from the date of this letter, develop, certify, and upload an approved Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database, per Section 5.2 of the General Order.
1 Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems; State Water Board Order 2022-0103-DWQ.
(https://www.waterboards.ca.gov/board_decisions/adopted_orders/water_quality/2022/ wqo_2022-0103-dwq.pdf).
993
Perry Gerdes - 2 - August 9, 2023
d. Conduct an internal audit of its Sewer System Management Plan and follow audit report due dates, per Section 5.4 of the General Order. e. Update its Sewer System Management Plan at minimum every six (6) years after the date of its last Plan Update due date, per Section 5.5 of the General Order. f. Designate Data Submitters, per Section 5.8 of the General Order. g. Within 6 months from the date of this letter, develop and implement a Spill Emergency Response Plan, per Section 5.12 and per Attachment D, section 6 (Spill Emergency Response Plan) of the General Order.
h. Within 12 months from the date of this letter or by July 1, 2025, whichever is later, submit an electronic Sanitary Sewer System Service Area Boundary Map, per Section 5.14 of the General Order.
i. Within 30 days of obtaining a CIWQS account, submit the initial Annual Report, as specified in section 3.9 (Annual Report) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of the General Order.

Include also in the Annual Report, a running 10-year system performance analysis, per Section 5.11 of the General Order.

Failure to comply with the requirements set forth in this Notice of Applicability and the Statewide General Order for Sanitary Sewer Systems could result in an enforcement action as authorized by the California Water Code.

If you have any questions regarding the statewide Sanitary Sewer Systems General Order or this Notice of Applicability, please email your questions to [email protected].

Sincerely,
FOR
Karen Mogus, Deputy Director
Division of Water Quality
Cc [via email]:

Colorado River Basin Regional Water Quality Control Board Paula Rasmussen, Executive Officer
[email protected]
Kai Dunn, Supervising Water Resource Control Engineer
[email protected]
Logan Raub, Senior Environmental Scientist
[email protected]
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
City of Banning
Sewer System Study
FINAL
November 2006
1090
1091
FINAL - December 1, 2006 i
H:\client\BanningCityof\7464A00\Dlv\Rpt\Final SMP\Sewer System Study Final_2.doc

CITY OF BANNING

SEWER SYSTEM STUDY

TABLE OF CONTENTS
Page No.

1.0 INTRODUCTION ..................................................................................................... 1

1.1 Authorization ..................................................................................................1

1.2 Purpose and Objective ...................................................................................1

1.3 Background....................................................................................................1

1.4 Study Area .....................................................................................................3

1.5 Scope of Work................................................................................................5

1.6 Acknowledgments ..........................................................................................5

1.7 Project Staff....................................................................................................5

2.0 LAND USE AND WASTEWATER FLOW PROJECTIONS....................................... 7

2.1 Existing and Future Land Use ........................................................................7

2.2 Population .................................................................................................... 15

2.3 Historic Wastewater Flows ........................................................................... 16

2.4 Wastewater Flow Factors............................................................................. 17

2.5 Peaking Factors ........................................................................................... 18

2.6 Diurnal Curve ............................................................................................... 19

2.7 Wastewater Flow Projections ....................................................................... 20

3.0 WASTEWATER TREATMENT............................................................................... 23

3.1 Existing Wastewater Treatment.................................................................... 23

3.2 Future Wastewater Treatment...................................................................... 23

3.3 Wastewater Reclamation.............................................................................. 30

3.4 Sludge Management .................................................................................... 30

4.0 PLANNING AND DESIGN CRITERIA.................................................................... 31

4.1 Regulatory Requirements............................................................................. 31

4.2 Wastewater Flow Factors............................................................................. 31

4.3 Wastewater Design Flows............................................................................ 31

4.4 Wastewater Peaking Factors........................................................................ 33

4.5 Pipeline Capacity Equations......................................................................... 35

4.6 Pumping Capacity Criteria............................................................................ 38

4.7 Cost Estimating Assumptions....................................................................... 39

5.0 MODEL DEVELOPMENT ...................................................................................... 41

5.1 Model Methodology...................................................................................... 41

5.2 Collection System......................................................................................... 42

5.3 Wastewater Load Allocation ......................................................................... 44

5.4 Model Calibration ......................................................................................... 47

6.0 COLLECTION SYSTEM ANALYSIS ...................................................................... 53

6.1 Evaluation Methodology ............................................................................... 53

6.2 Existing Collection System Analysis ............................................................. 53 1092
ii FINAL - December 1, 2006
H:\client\BanningCityof\7464A00\Dlv\Rpt\Final SMP\Sewer System Study Final_2.doc

6.3 Future Collection System Analysis ............................................................... 59

6.4 Future Treatment System Analysis............................................................... 63

6.5 Recommended System Configuration .......................................................... 67

7.0 CAPITAL IMPROVEMENT PLAN .......................................................................... 69

7.1 Phasing of Improvements............................................................................. 69

7.2 Cost Estimates ............................................................................................. 73

7.3 Phasing of Project Cost................................................................................ 76

APPENDICES
Appendix A - References................................................................................................. A-1 Appendix B - Wastewater Flow Projections ..................................................................... B-1 Appendix C - Flow Monitoring Data ................................................................................. C-1

LIST OF FIGURES
Figure 1.1 Vicinity Map and Study Area .......................................................................... 4 Figure 2.1 Aerial View ..................................................................................................... 9 Figure 2.2 General Plan Land Use ................................................................................ 13 Figure 2.3 Historic Average Daily Plant Flows............................................................... 16 Figure 2.4 Historic Average Monthly Plant Flows .......................................................... 17 Figure 2.5 Wastewater Diurnal Curve............................................................................ 20 Figure 5.1 Existing Sewer Collection System ................................................................ 45 Figure 5.2 Tributary Areas and Monitoring Locations .................................................... 49 Figure 6.1 Existing System and Future System Deficiencies......................................... 55 Figure 6.2 Existing and Future System Recommendations ........................................... 57 Figure 7.1 Phasing of Proposed Sewer System Improvements..................................... 71 Figure 7.2 Distribution of Estimated Capital Cost .......................................................... 73

LIST OF TABLES
Table 1.1 Status of 1994 Sewer System Improvements................................................. 3 Table 2.1 Existing Development by Land Use Category................................................. 8 Table 2.2 Specific Plan Land Use Summary ................................................................ 11 Table 2.2 Specific Plan Land Use Summary (Continued)............................................. 12 Table 2.3 General Plan Land Use Summary ................................................................ 15 Table 2.4 Population Projections by Area..................................................................... 15 Table 2.5 Population Projections by Year..................................................................... 16 Table 2.6 Wastewater Flow Factors............................................................................. 18 Table 2.7 Wastewater Flow Projections - ADWF.......................................................... 21 Table 2.8 Wastewater Flow Projections - PDWF.......................................................... 21 Table 3.1 Wastewater Flow Projections Summary ....................................................... 24 Table 3.2 Cost Estimate Alternative 1 - WWTP Expansion Only .................................. 26 Table 3.3 Cost Estimate Alternative 2 - Pardee Satellite Plant ..................................... 26 Table 3.4 Cost Estimate Alternative 3 - LL & BB Satellite Plant.................................... 27 Table 3.5 Cost Estimate Alternative 4 - Two Satellite Plants ........................................ 28 Table 3.6 Alternatives Comparison - Treatment Cost Only........................................... 28 1093
FINAL - December 1, 2006 iii
H:\client\BanningCityof\7464A00\Dlv\Rpt\Final SMP\Sewer System Study Final_2.doc Table 4.1 Wastewater Peaking Factors........................................................................ 35 Table 4.2 Minimum Recommended Slopes for Circular Gravity Pipes.......................... 37 Table 4.3 Maximum Depth to Pipe Diameter Ratio....................................................... 37 Table 4.4 Standard Pipeline Sizes ............................................................................... 38 Table 4.5 Cost Estimating Assumptions....................................................................... 39 Table 4.5 Cost Estimating Assumptions (Continued) ................................................... 40 Table 5.1 Model and GIS summary.............................................................................. 41 Table 5.2 Model Pipeline Characteristics ..................................................................... 43 Table 5.3 Lift Station Summary.................................................................................... 44 Table 5.4 Flow Monitoring Locations............................................................................ 48 Table 5.5 Flow Monitoring Data Summary ................................................................... 48 Table 5.6 Model Calibration Results............................................................................. 51 Table 6.1 Existing System Deficiencies........................................................................ 54 Table 6.2 Existing System Recommendations ............................................................. 59 Table 6.3 Future System Deficiencies - Peak Dry Weather Conditions ........................ 61 Table 6.4 Future System Deficiencies - Peak Wet Weather Conditions ....................... 62 Table 6.5 Future Collection System Recommendations............................................... 63 Table 6.6 Alternatives Comparison .............................................................................. 66 Table 6.7 Future Treatment System Recommendations .............................................. 67 Table 7.1 Sewer System Improvements - Phasing....................................................... 70 Table 7.2 Sewer System Improvements - Cost Estimates............................................ 74 Table 7.2 Sewer System Improvements - Cost Estimates (Continued) ........................ 75 Table 7.3 Phasing of Sewer System CIP...................................................................... 76 1094
iv FINAL - December 1, 2006
H:\client\BanningCityof\7464A00\Dlv\Rpt\Final SMP\Sewer System Study Final_2.doc

LIST OF ABBREVIATIONS
Abbreviation Description
ADWF Average Dry Weather Flow
ADF Average Day Flow
AS Activated Sludge
BWF Base Wastewater Flow
cf Cubic feet
cfs Cubic feet per second
Carollo Carollo Engineers
City City of Banning
CI Cast iron
CIMIS California Irrigation Management Information System CIP Capital improvement program
d/D depth of flow to pipe diameter ratio
du/ac Dwelling unit per acre
fps feet per second
ft2
square foot
gpd/ac gallon per day per acre
gpd/cap gallons per day per capita
GWI Groundwater Inflow
lf Lineal Feet
mgd million gallons per day
PDWF Peak Dry Weather Flow
PVC Polyvinyl chloride
PWWF Peak Wet Weather Flow
RDI Rainfall dependent Inflow and Infiltration
ROW Right of Way
RWQCB California Regional Water Quality Control Board
TF Trickling Filter
VCP Vitrified clay pipe
WDR Waste Discharge Requirements
WFF Wastewater Flow Factor
WWTP Wastewater Treatment Plant

1095
FINAL - December 1, 2006 1
H:\client\BanningCityof\7464A00\Dlv\Rpt\Final SMP\Sewer System Study Final_2.doc Sewer System Study

1.0 INTRODUCTION

1.1 Authorization
This report is prepared in accordance with the consulting engineering agreement for the water, sewer, and recycled water master plan update project between the City of Banning (City) and Carollo Engineers (Carollo), dated March 14, 2006. This report represents the findings of the work conducted for Task B (Sewer Master Plan Update). The findings of Task A (Water Master Plan Update) and Task C (Water Reuse Master Plan Update) are presented in separate reports.

1.2 Purpose and Objective

1.2.1 Purpose
The purpose of this Sewer System Study is to update the 1994 Sewer Master Plan that was prepared by NBS Lowry [1]. This document identifies the deficiencies of the City’s existing sewer system under existing and ultimate sewer demands, provides recommendations for improvements to address these deficiencies, and summarizes these improvements in a Capital Improvement Program (CIP).

1.2.2 Objectives
The objectives of this Sewer System Study are:

1. Identify the existing and ultimate wastewater flows in the City.

2. Define planning and evaluation criteria for the City’s sewer system.

3. Determine the deficiencies in the City’s existing sewer system under existing and ultimate wastewater flows.

4. Determine improvements to address the system deficiencies under existing and ultimate wastewater flows.

5. Prepare a CIP including phasing and cost estimates for the recommended improvements to the City’s sewer system.

1.3 Background
During the last decade, the City has experienced an increased level of land use planning activities that will continue to increase the City’s wastewater flows. The City’s wastewater flowrate has already increased with the completion of the Sun Lakes Development. Five 1096
2 FINAL - December 1, 2006
H:\client\BanningCityof\7464A00\Dlv\Rpt\Final SMP\Sewer System Study Final_2.doc additional residential developments that are currently being planned within City’s service area will further increase the City’s sewer flows. These developments are:
• Five Bridges Development by Lennar
• Pardee Development by Pardee Homes
• Black Bench Development by SunCal Companies
• Loma Linda Development (Banning Bench)
• BDS Development south of Interstate 10
These developments are depicted on Figure 2.1. To accommodate the increase in sewer flows that are associated with these developments, the City recognized a need to update their sewer master plan. This study will evaluate the capacity of the City’s existing sewer collection system to convey the existing and projected wastewater flows and make recommendations where needed to expand the existing sewer system.

1.3.1 Previous Studies
NBS Lowry prepared the previous Sewer Master Plan [1] in 1994. In this sewer system study, a number of sewer system improvements were recommended. These improvements and the status of implementing these improvements are summarized in Table 1.1. As shown in this table, the City has only implemented two of the recommended improvements to date, as the majority of improvements are associated with the proposed developments.

This study will review the need for the remaining improvements and adjust the pipeline sizing where needed to address the updated wastewater flow projections.

Montgomery Watson Harza (MWH) completed a report titled “Update of the Banning Wastewater Treatment Facility Expansion Plan” [2] in March 2006. This study updated the 1994 Wastewater Treatment Plant (WWTP) Facility Upgrade Plan. The report evaluated process alternatives for the phased expansion of the WWTP to meet future increased wastewater treatment needs. A three stage WWTP expansion was recommended to increase the plant capacity from 3.6 million gallons per day (mgd) (2006) to 7.8 mgd (2025).

In addition, the General Plan and various specific plans were used to estimate the future wastewater flows. More information on these reports is in included in Section 2. 1097
FINAL - December 1, 2006 3
H:\client\BanningCityof\7464A00\Dlv\Rpt\Final SMP\Sewer System Study Final_2.doc (1) Improvements identified in 1994 Sewer Master Plan [1]. (2) As of August 2006.

1.4 Study Area
The study area of this sewer system study includes the entire City’s service area. The City is located in the northwest portion of Riverside County and is situated along Interstate 10 approximately 30 miles east of the City of Riverside and 25 miles west of Palm Springs.

The study area is shown on Figure 1.1.

The City encompasses 25 square miles and has a current population of approximately 29,000. Approximately 8 square miles or 32 percent of the City’s service area is currently developed. The City is growing rapidly and has an estimated build out population of nearly 100,000. The five near-term developments as indicated on Figure 2.1 have a combined area of nearly 4 square miles and are projected to increase the City’s population by 31,000 to 60,000. Hence, the City will still have significant room for growth after the completion of these developments.

Table 1.1 Status of 1994 Sewer System Improvements
Sewer System Study
City of Banning
No Sewer System Improvements(1) Completed(2)
1 Expansion of the Westward Avenue Lift Station by a capacity of 300 gpm √
2 Add a diversion sewer line consisting of a diversion manhole and 1,100 lf of 10-inch sewer on Omar Street. √
3 Add a parallel sewer line consisting of 700 lf of 12-inch sewers on Livingston Street. -
4 Add a trunk sewer line consisting of 4,200 lf of 8-inch and 8,800 lf of 10-inch sewer lines on Highland Springs Avenue. - 5 Add a trunk sewer line consisting of 14,700 lf of 8-inch, 3,600 lf of 10-inch, and 5,200 lf of 12-inch sewer on Highland Home Road.
-
6 Add a trunk sewer line consisting of one diversion manhole and 17,300 lf of 18-inch sewer on Deutsch. -
7 Add a trunk sewer line consisting of 10,400 lf of 8-inch sewer on Banning Creek. -
8 Add a parallel sewer line consisting of 800 lf of 12-inch sewer on San Gorgonio Avenue. -
9 Add a trunk sewer line consisting of 10,400 lf of 8-inch sewer on the southern limits. -
10 Add a trunk sewer line consisting of 3,000 lf of 8-inch sewer on 8th Street. -
11 Add a trunk sewer line consisting of 11,600 lf of 8-inch sewer on Sunset Avenue. -
12 Add 4,200 lf of 10-inch sewer lines, 4,200 lf of 10-inch force main and an 870 gpm lift station on the eastern limits. - 1098


t
t
t
t
t
t
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
and planning purposes only.2. This map is intended for display the City of Banning GIS.1. This map contains data fromNote:

City of Banning, CA - Sewer System Study
Banning Beaumont
Cabazon
Palm Springs
Cathedral City
Riverside Moreno Valley
North Palm Springs
S at t e Hwy 79
State Hwy 60
S at et Hwy 111
State Hwy 62
State Hwy 38
Figure 1.1 - Vicinity Map and Study Area October 2006 San Bernardino County Riverside County S at et Hwy 243
I-215
Yucaipa
Cherry Valley
Calimesa
Redlands
San Bernardino
Perris
San Jacinto

0 5 10 2.5
Miles

Page 4 ends
← All documents from this meeting