Engineering Division
Contract Change Orders Sheet 1 of 2
Change Requested by: Engineer Contractor
Change Order No. Suppl. Number Contract Number CO-RTE-PM Federal Numbers 8 BRLS-5298(030)
TO
Kleinfelder, Inc. , Contractor
You are directed to make the following changes from the plans and specifications or do the following described work not included in the plans and specifications for this contract. NOTE: This change order is not effective until approved by the City.

In accordance with “Changes and Extra Work” of the Standard Specification, the following work items have been revised:

Task
No.

Description Amount Percentage

1. Project Management $20,000.00

2. Engineering Reports

3. Utility Relocation

4. Permits and Agreements

5. Right of Way Engineering

6. Prepare Draft Roadway PS&E

7. Site Investigation for Hazardous Waste

8. Draft Structures PS&E

9. Final Structures PS&E

10. Prepare Final PS&E $28,000.00

11. Right of Way Certification Document $2,000.00

12. Utility Potholing
Direct Costs
13 Building Demolition Direct Cost

14. Design Support during Construction
Estimated Cost: Increase Decrease Amount: $50,000.00
For this order, the time of completion will be adjusted as follows: Working Days

REQUESTED BY

SIGNATURE (PRINT NAME AND TITLE) DATE
Karibia Baillargeon, Project Manager 3/2/22

APPROVAL RECOMMENDED BY

SIGNATURE (PRINT NAME AND TITLE) DATE
Brad S. Merrell, Consultant City Engineer

CITY APPROVAL BY

SIGNATURE (PRINT NAME AND TITLE) DATE
Willie A. Hopkins Jr., City Manager
We, the undersigned contractor, have given careful consideration to the change proposed and agree to provide equipment, furnish materials, and perform the work specified above, and will accept as full payment the prices shown above. NOTE: If you do not sign this order, you are directed to proceed with the ordered work. You may file a Request for Information within the time specified.

CONTRACTOR ACCEPTANCE BY

SIGNATURE (PRINT NAME AND TITLE) DATE
Karibia Baillargeon, Project Manager 3/2/22
Description of work to be done, estimate of quantities, and prices to be paid. (Segregate between work at contract price, agreed price, and force account.) Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. The last percentage shown is the net accumulated increase or decrease from the original quantity in the Bid Item List.

Sheet 2 of 2
March 2, 2022
Mr. Domingo Gonzales
Engineering Services Administrator
City of Barstow
220 East Mountain View Street, Suite A
Barstow, CA 92311
SUBJECT: Change Order #8 - for North 1st Avenue Bridge Over the BNSF Railroad Dear Domingo:

The previous Change Order #6, Phase II, included the submittal of final PS&E package and one comment/review cycle to address any questions from the City, update the package, and submit responses with final plans ready for the Bid Phase.

As requested by the City, to keep the project moving forward, we’ve accommodated three additional formal comment/review cycles from SBCTA after the final PS&E submittal. These cycles included back-checks, comments not captured in older design packages, Constructability Review, Quantity Independent Check, Cost Estimate and SSPs iterations.

In parallel, we have been supporting the City and SBCTA to address comments from HBP HQ regarding construction funding, participating and non-participating items work in the Cost Estimate, and justifications of geometric design. These activities require numerous revisions of the Cost Estimate in addition to those from the formal comment/review cycles.

This Change Order #8 was prepared to cover the additional fee for this additional scope of work along with Bid Phase support to the City and SBCTA. The total fee for Change Order #8 is $50,000.00 and would increase the total contract by this amount.

Please review the attached, and if in agreement, sign and return a fully executed copy for our files.

Sincerely,
KLEINFELDER, INC.

Karibia Baillargeon
Project Manager
770 First Avenue, Suite 400, San Diego CA 92101 p | 619.831.4600 f | 619.232.1039