Text extracted from the city's file for reading and search. Open the original on barstowcityca.iqm2.com. That file is the official record.

BARSTOW M
Measure I
Funded
Completed
• First Avenue Bridge Over BNSF Railroad Tracks -
Replacement of nearly 90-year-old steel truss bridge,
with upgraded concrete bridge designed to meet current
vehicle and pedestrian ADA requirements.
• Lenwood Road Grade Separation -
Construction of grade separation elevating Lenwood Road crossing over BNSF railroad tracks.
• Total Road Improvement Program (TRIP)
Rimrock Road - Replacement of pavement and widening
of Rimrock Rd from Barstow Road, east to Dean Wash.

Work also included concrete sidewalk and curb and gutter repairs, and upgrades on ADA ramps.
• Cameron Area -
Replacement of pavement in streets, concrete sidewalk, curb and gutter repairs, and upgrades on ADA ramps in Central Barstow. • Montara Area -
Replacement of pavement in streets, concrete sidewalk, curb and gutter repairs, and upgrades on ADA ramps in East Barstow.

Current and Future
• Installation of Traffic Signal at Barstow and Rimrock Roads • First Avenue - Mojave River Bridge and Overflow Bridge - Replacement of existing bridges which have design and
seismic deficiencies.
• West Section 7th Street Improvement Project - Phase II and III - Replacement of existing paving and upgrading / widening street section with construction of concrete curbs and gutters. • Pedestrian and Bicycle Corridor Project - BARSTOW
Improvements to City streets and sidewalks as part of the ROUTE "Safe Routes to Schools" and City's Active Transportation Program. 66 Pavement Preservation and Rehabilitation - Cameron Area.

Rimrock Road Reconstruction Project -
Pavement replacement on Rimrock Road from Barstow Road
to Avenue H.

Lenwood Road Reconstruction Project -
Pavement replacement on Lenwood Road between Agate Road to railroad tracks.
sb MEASURE I

SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY

MEASURE I

BY THE NUMBERS
Promises Made - Promises Kept
When the voters of San Bernardino County overwhelmingly approved the Measure extension in 2004, it came with a commitment by SBCTA to deliver on the promises of a better transportation system.

That promise has been kept as the agency
continues to offer more choices for
how we move to and through our
beautiful county.

Measure I has participated in the delivery of
$2.5 projects in a wide range of its programs, totaling $700M $2.9 billion, with Measure I contributing
Billion $682 million. Local
Improvements
generated for
projects and
programs
More than $700 Million
$2.9
has been returned to local
jurisdictions for projects like
Billion sidewalks, pothole repairs, and
improved signalization
Regional at intersections.

Infrastructure
Improvements A
Freeway titi
32,500
Grade Separations
Jobs Interchanges Double Track
Supported by Measure I* sb
* Statistic based on job impact numbers from
USDOT, and revenue generated by Measure I cta Rote Transportati Transit since 2010.

San Bernardino County Transportation Authority
909.884.8276 www.goSBCTA.com
1170 W. Third Street, San Bernardino, CA 92410

← All documents from this meeting