PROCESS/MANUFACTURER
Cab Paint Process/Manufacturer PPG 1
O 1522-800 CAB PAINT PRIMARY/LOWER
COLOR
Cab Paint Primary/Lower Color PPG Red FBCH
926234
1 O 1523-013 CAB PAINT SECONDARY/UPPER
COLOR
Cab Paint Sec/Upper Color PPG Black FBCH 9000 1
O 1524-002 CAB PAINT EXTERIOR
BREAKLINE
Cab Paint Exterior Breakline Classic 1
O 1515-004 CAB PAINT PINSTRIPE Cab Paint Pinstripe 1/2" Gold Leaf 1 S 8013-156 CAB PAINT WARRANTY Cab Paint Warranty PPG (10) Year RFW0710 1 O 1334-039 CAB PAINT INTERIOR Cab Paint Int Multi-tone Onyx Blk 1 S 1005-001 CAB ENTRY DOORS Cab Entry Doors (4) 1
O 1101-102 CAB ENTRY DOOR TYPE Cab Entry Door Type Barrier Free w/Pollak Switches 1 S 1322-007 CAB INSULATION Cab Insulation Nonwoven Polyester Fiber 1 O 1556-009 LH MID EMS COMPARTMENT LH Mid EMS Compartment 26"H w/Offset to 24"W Chamfered Corner
1 O 1558-027 LH MID EMS COMPARTMENT
EXTERIOR ACCESS
LH Mid EMS Cmpt Ext Access 26"H Hng Dr w/DA
Sand Dr Pnl
1 O 1560-002 LH MID EMS COMPARTMENT LH Mid EMS Cmpt Interior Solid Wall No Access 1
9.a
Packet Pg. 244 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
INTERIOR
O 1566-002 LH MID EMS COMPARTMENT
DOOR HARDWARE
LH Mid EMS Cmpt Door Hardware D-Ring Latch 1
O 1557-008 RH MID EMS COMPARTMENT RH Mid EMS Compartment 26"H w/Offset to 24"W Chamfered Corner
1 O 1559-027 RH MID EMS COMPARTMENT
EXTERIOR ACCESS
RH Mid EMS Cmpt Ext Access 26"H Hng Dr w/DA
Sand Dr Pnl
1 O 1561-002 RH MID EMS COMPARTMENT
INTERIOR
RH Mid EMS Cmpt Interior Solid Wall No Access 1
O 1567-002 RH MID EMS COMPARTMENT
DOOR HARDWARE
RH Mid EMS Cmpt Door Hardware D-Ring Latch 1
O 5384-002 MID EMS COMPARTMENT
LIGHTING
Mid EMS Compartment Lighting LED 2
O 1535-020 MID EMS COMPARTMENT
EXTERIOR FINISH
Mid EMS Cmpt Ext Finish Multi-tone Onyx Black 1
O 1536-002 MID EMS COMPARTMENT
INTERIOR FINISH
Mid EMS Cmpt Interior Finish DA Sand 1
S 8004-033 CAB STRUCTURAL WARRANTY Cab Structural Warranty (10) Year RFW0602 1 S 9001-006 CAB TEST INFORMATION Cab Test Information Crash Test ECE-R29/SAE J2420/SAE J2422
1 ELECTRICAL POWER DISTRIBUTION
S 5000-018 ELECTRICAL SYSTEM Elec System 12V DC Multiplex 1 O 5008-072 OEM WIRING OEM Wir Smeal ECM Park Brake Input 1 O 5005-300 VEHICLE DISPLAY Vehicle Display UltraView 780 Touchscreen w/Push Button Surround LH Sw Pnl
1 O 5046-078 MULTIPLEX DISPLAY SPECIAL
LAYOUT
Multiplex Display Special Layout Wiper Sys Prk Brk
Override Btn & Day/Night Dim
1 S 5004-002 LOAD MANAGEMENT SYSTEM Load Management System Multiplex 1 O 5622-003 DATA RECORDING SYSTEM Data Recording Sys Vehicle Data Weldon MUX 1 O 5031-013 ACCESSORY POWER Accessory Pwr & Gnd Stud 40A Batt & 15A Ign w/350A Mstr Sw/300A Batt OEM Conn
1 O 5030-050 AUXILIARY ACCESSORY
POWER
Aux Acc Pwr 6 Fuse Blue Sea Pnl Bhd Sw Pnl w/40A
Fuse Batt Dir
1 O 5032-036 ADDITIONAL ACCESSORY
POWER
Addl Acc Pwr 6 Fuse Blue Sea Pnl Eng Tnl Bhd Off
Seat w/40A Brkr Batt Dir
1 S 5011-001 EXTERIOR ELECTRICAL
TERMINAL COATING
Exterior Electrical Terminal Coating Spray On Plasti
Dip
1 S 8014-002 ELECTRICAL SYSTEM
WARRANTY
Electrical System Warranty (2) Year RFW0202 1
ENGINE
O 1701-171 ENGINE Engine Diesel 565HP Cummins X15 - Legacy 1 S 1329-002 CAB ENGINE TUNNEL Cab Engine Tunnel Large 1
O 1731-002 DIESEL PARTICULATE FILTER
CONTROLS
DPF Ctrl Regeneration Sw & Inhibit Sw 1
S 1718-002 ENGINE PROGRAMMING HIGH
IDLE SPEED
Engine Programming High Idle Speed 1250 RPM 1
S 1719-005 ENGINE HIGH IDLE CONTROL Engine High Idle Ctrl Automatic and Manual w/Disp Actv
1 S 1710-001 ENGINE PROGRAMMING ROAD
SPEED GOVERNOR
Engine Programming Road Speed Governor Enabled 1
S 1713-010 AUXILIARY ENGINE BRAKE Aux Engine Brake Compression Brake w/VG Turbo 1 O 1708-005 AUXILIARY ENGINE BRAKE
CONTROL
Aux Engine Brake Ctrl Off/Low/High Sw Pnl 1
S 1720-003 ELECTRONIC ENGINE OIL
LEVEL INDICATOR
Elec Engine Oil Level Indicator 1
O 1715-004 FLUID FILLS Fluid Fills Fwd For Large Displacement Cap 1 S 1735-001 ENGINE DRAIN PLUG Engine Drain Plug 1
S 8002-001 ENGINE WARRANTY Engine Warranty Cummins (5) Year/100,000 Miles 1
9.a
Packet Pg. 245 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) S 1707-116 REMOTE THROTTLE HARNESS Rmt Throttle Harness Cab Harness Only Shift Interlock 1 S 1721-001 ENGINE PROGRAMMING
REMOTE THROTTLE
Engine Program Rmt Throttle Off 1
S 1727-001 ENGINE PROGRAMMING IDLE
SPEED
Engine Programming Idle Speed 700 RPM 1
AIR INTAKE
S 2801-010 ENGINE AIR INTAKE Engine Air Intake Filtration and Restriction w/Replaceable Element Abv Radiator
1 COOLING
S 2704-016 ENGINE FAN DRIVE Engine Fan Drive Variable Speed 1 S 2701-021 ENGINE COOLING SYSTEM Engine Cooling System Serial Flow w/Package Drop-Out Prov
1 S 2711-005 ENGINE COOLING SYSTEM
PROTECTION
Engine Cooling System Protection Light Duty Skid
Plate Paint Frame Color
1 S 2708-001 ENGINE COOLANT Engine Coolant Extended Life 1 O 2707-002 ENGINE COOLANT FILTER Engine Coolant Filter 1 S 2706-003 ELECTRONIC COOLANT LEVEL
INDICATOR
Elec Low Coolant Level Indicator 1
S 2709-001 COOLANT HOSES Coolant Hoses Silicone 1
O 2710-005 ENGINE COOLANT OVERFLOW
BOTTLE
Engine Coolant Overflow Expansion Bottle 1
O 2705-002 ENGINE PUMP HEAT
EXCHANGER
Engine Pump Heat Exchanger 1
EXHAUST
O 2901-074 ENGINE EXHAUST SYSTEM Eng Exhaust Sys Under Frm RH Single Module Aftertreatment Inboard Inner Frm Mnt
1 O 2907-003 DIESEL EXHAUST FLUID TANK Diesel Exhaust Fluid Tank LH 6 Gal Fill Thru Rr Step 1 S 2902-010 ENGINE EXHAUST
ACCESSORIES
Engine Exhaust Acc Temp Mitigation 1
S 2906-002 ENGINE EXHAUST WRAP Engine Exhaust Wrap 1
O 8018-002 EMISSIONS SYSTEM
WARRANTY
Emissions System Warranty (5) Years/100,000 Miles
RFW0140
1 TRANSMISSION
O 1801-017 TRANSMISSION Transmission Allison 4000 EVS 1 O 1806-002 TRANSMISSION MODE
PROGRAMMING
Transmission Mode Programming 5th Startup/5th
Mode
1 S 1811-004 TRANSMISSION FEATURE
PROGRAMMING
Transmission Feature Programming Allison Gen 5 &
6-E I/O Package 198/Pumper
1 S 1807-005 TRANSMISSION SHIFT
SELECTOR
Transmission GEN 5 & 6-E Shift Sel Key Pad/Push
Button
1 S 1815-002 ELECTRONIC TRANSMISSION
OIL LEVEL INDICATOR
Elec Transmission Oil Level Indicator 1
S 1814-002 TRANSMISSION PRE-SELECT
WITH AUXILIARY BRAKE
2nd Gear Pre-Select 1
S 1808-007 TRANSMISSION COOLING
SYSTEM
Transmission Cooling System 1
S 1817-001 TRANSMISSION DRAIN PLUG Transmission Drain Plug 1 S 8005-001 TRANSMISSION WARRANTY Transmission Warranty Allison (5) Year 1
POWER TAKE OFF
9.a
Packet Pg. 246 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) O 2004-003 LH PTO LH PTO Chassis Sply 1
O 2001-154 LH PTO MODEL LH PTO Model Chelsea 281-GGFJP-E5XD 1 O 2005-008 PTO LOCATION PTO Location 8:00/1:00 1
O 2015-030 LH PTO CONTROL LH PTO Ctrl Rkr Enable "Aerial Master"/Rkr Actv "Aerial PTO"
1 DRIVELINE
O 3001-017 DRIVELINE Driveline MSI 1810/1710 w/Meritor U-Joints w/Thrust Washers
1 O 3005-074 MIDSHIP PUMP / GEARBOX Midship Pump Jackshaft w/Smeal Aerial Pump Mount Holes
1 S 3008-085 MIDSHIP PUMP / GEARBOX
MODEL
Midship Pump/Gearbox Model Waterous
CSUC20/C22 Fwd
1 O 3048-006 MIDSHIP PUMP GEARBOX
DROP
Midship Driveline Pump Gearbox Drop Waterous "B" 1
O 3009-008 MIDSHIP PUMP RATIO Midship Pump Ratio 2.46:1 1 O 3010-113
0 MIDSHIP PUMP LOCATION C/L
SUCTION TO C/L REAR AXLE
Midship Pump Location C/L Suction to C/L Rear Axle
113.0"
1 O 5013-032 PUMP SHIFT CONTROLS Pump Shift Ctrl Air Ctrl Integrated Shifter Pod 1 O 3049-003 PUMP SHIFT CONTROL
PLUMBING
Pump Shift Control Plumbing Pre-Plumb Elec/Air 1
FUEL SYSTEMS
S 3109-064 FUEL FILTER/WATER
SEPARATOR
Fuel Filter/Wtr Separator Racor GreenMAX 6600R
w/Lt & Alarm
1 S 3111-002 FUEL LINES Fuel Lines Wire Braid 1
O 3104-012 FUEL SHUTOFF VALVE Fuel Shutoff Valve at Tank and (2) at Primary Filter 1 S 3103-008 ELECTRIC FUEL PRIMER Electric Fuel Primer Engine Sply Electric Lift Pump 1 O 3112-018 FUEL COOLER Fuel Cooler w/Active Cooling Fan/Temp Ctrl Sw 1 O 3101-102 FUEL TANK Fuel Tank 68 Gallon 1
S 3130-001 FUEL TANK MATERIAL AND
FINISH
Fuel Tank Material Steel & Finish Painted Frame
Components Color
1 S 3131-001 FUEL TANK STRAP MATERIAL
AND FINISH
Fuel Tank Strap Material Steel & Finish Painted Frame
Components Color
1 O 3132-011 FUEL TANK MISCELLANEOUS
OPTIONS
Fuel Tank Miscellaneous Options - Temporarily
Mounted
1 O 3102-016 FUEL TANK FILL PORT Fuel Tank Fill Port LH Mid/RH Mid/LH Fwd 1 O 3114-006 FUEL TANK SERVICEABILITY
PROVISIONS
Fuel Tank Serviceability Prov 12' Fuel Line Extension 1 S 3115-002 FUEL TANK DRAIN PLUG Fuel Tank Drain Plug Magnetic 1
FRONT AXLE
O 2401-039 FRONT AXLE Frt Axle Hendrickson STEERTEK NXT Fabricated Box Beam 24000#
1 O 8059-025 FRONT AXLE WARRANTY Front Axle Warranty Hendrickson STEERTEK NXT Extended
1 S 2405-001 FRONT WHEEL BEARING
LUBRICATION
Frt Wheel Bearing Lube Oil 1
FRONT SUSPENSION
O 2502-006 FRONT SHOCK ABSORBERS Frt Shock Absorbers Suspension Sply 1 O 2501-019 FRONT SUSPENSION Frt Suspension Parabolic STEERTEK NXT Integrated 18000-24000# Spring Pack
1 9.a
Packet Pg. 247 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
STEERING
S 2601-006 STEERING COLUMN/WHEEL Steering Column/Whl Tilt/Teles 18" 4 Spk 1 S 2609-002 ELECTRONIC POWER
STEERING FLUID LEVEL
INDICATOR
Elec Power Steering Fluid Level Indicator 1
S 2603-016 POWER STEERING PUMP Power Steering Pump Vickers V20H w/Passive Cooler 1 O 2606-016 FRONT AXLE CRAMP ANGLE Front Axle Cramp Angle 45L/43R Degrees 1 S 2610-005 POWER STEERING GEAR Power Steering Gear TRW TAS 85 w/Assist 1 S 2608-001 CHASSIS ALIGNMENT Chassis Alignment 1
REAR AXLE
O 3401-012 REAR AXLE Rear Axle 54000# Meritor RT-52-185 1 S 3403-001 REAR AXLE DIFFERENTIAL
LUBRICATION
Rear Axle Differential Lubrication Oil 1
S 8061-023 REAR AXLE WARRANTY Rear Axle Warranty Meritor 2028 1 S 3411-001 REAR WHEEL BEARING
LUBRICATION
Rear Wheel Bearing Lubrication Oil 1
O 3407-033 REAR AXLE DIFFERENTIAL
CONTROL
Rear Axle Differential Ctrl Interaxle Lock 1
O 3408-004 VEHICLE TOP SPEED Vehicle Top Speed 65 MPH 1 S 3410-001 REAR AXLE EXTERNAL VENT Rear Axle External Vent OEM Housing Breather 1
REAR SUSPENSION
O 3501-035 REAR SUSPENSION Rear Susp Hendrickson FireMaax Air 48001-54000# 1 O 3503-003 REAR SHOCK ABSORBERS Rear Shock Absorbers Suspension Sply 1 TIRES
S 3625-002 TIRE INTERMITTENT SERVICE
RATING
Tire Intermittent Service Ratings Acceptable 1
O 3601-063 FRONT TIRE Frt Tire 425/65R 22.5 Michelin XZY3 2 O 3602-053 REAR TIRE Rear Tire 315/80R 22.5 Michelin X Works XDY 8 O 3413-538 REAR AXLE RATIO Rear Axle Ratio 5.38 1
S 3614-030 TIRE PRESSURE INDICATOR Tire Pressure Ind Frt & Rr LED 1 WHEELS
O 3701-034 FRONT WHEEL Frt Wheel Alcoa Dura-Bright 22.5 x 12.25 Alum 2 O 3703-050 REAR WHEEL Rr Whl Alcoa Dura-Bright 22.5 x 9.00 Alum 8 O 3719-002 BALANCE WHEELS AND TIRES Balance Wheels & Tires 1 O 3702-002 WHEEL TRIM Wheel Trim Hub & Nut Covers SS Shiploose 1 BRAKES
O 3205-015 BRAKE SYSTEM Brake System ABS/ATC/ESC Tandem Axle Disp Actv 1 S 3206-003 FRONT BRAKES Frt Brakes Meritor EX225 Disc 17" 1 S 3207-005 REAR BRAKES Rr Brakes S-Cam Drum 16.5" x 7" Cast Iron Shoe 1 S 3208-001 PARK BRAKE Prk Brake Rr Wheels Only 1
O 3219-002 SUPPLEMENTAL BRAKE Supplemental Brake Frt Service Brakes Prk Brk Actv 1 S 3204-029 PARK BRAKE CONTROL Prk Brake Ctrl LH Tunnel Mnt, Integrated w/Shift Pod, Adjacent To Trans Shifter
1 O 3214-002 REAR BRAKE SLACK
ADJUSTERS
Rr Brake Slack Adjusters Haldex 1
O 3202-005 AIR DRYER Air Dryer Wabco System Saver 1200 Bhd LH Batt Box 1 O 3215-009 FRONT BRAKE CHAMBERS Frt Brake Chambers Hendrickson STEERTEK NXT 1
9.a
Packet Pg. 248 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Type 24
S 3210-015 REAR BRAKE CHAMBERS Rr Brake Chambers TSE 30/36 Long Stroke 2
AIR SUPPLY SYSTEMS
S 3320-001 AIR COMPRESSOR Air Compressor Wabco SS318 18.7 CFM 1 S 3339-004 AIR GOVERNOR Air Governor Mnt on Air Dryer Bracket 1 O 3303-005 MOISTURE EJECTORS Moisture Ejectors Auto w/Cable 1 O 3307-001 AIR SUPPLY LINES Air Sply Lines Nylon w/Compression Fittings 1 O 3309-033 AIR INLET CONNECTION Air Inlet Connection 1
O 3349-002 AIR INLET LOCATION Air Inlet Location LH Lwr Frt Step Fwd 1 O 3326-002 AIR INLET/OUTLET FITTING
TYPE
Air Inlet/Outlet Manual Conn Tru-Flate Interchange
1/4"
1 S 3338-002 REAR AIR TANK MOUNTING Rear Air Tank Mnt Any Bhd Rear Axle Perpendicular w/Frame
1 FRAME
O 2103-233
0 WHEELBASE Wheelbase 233.0" 1
O 2106-064
0 REAR OVERHANG Rear Overhang 64.0" 1
S 2101-002 FRAME Frame Double Channel 35.00" Width 1
O 2111-136 MISC FRAME OPTIONS Misc Frame Options Smeal Aerials 105RM, 100RM, 125RM, 100MM Layout 4
1 O 2117-004 FRAME CLEAR AREA Frame Clear Area Inside/Outside Rail 30" Rwd Back of Cab
1 S 2110-201 FRAME PAINT Frame Paint Hot Dipped Galvanized - Frame Only Addl Comp Blk Powder Coat
1 S 8007-036 FRAME ASSEMBLY
STRUCTURAL WARRANTY
Frame Assembly Structural Warranty (50) Year
RFW0305
1 S 8019-003 FRAME RAIL CORROSION
WARRANTY
Frame Rail Corrosion Warranty (25) Year RFW0316 1
S 8022-004 FRAME COMPONENTS
CORROSION WARRANTY
Frame Components Corrosion Warranty (3) Year
RFW0315
1 BUMPER
O 2201-002 FRONT BUMPER Frt Bumper Structural Steel Channel Severe Duty 1 S 2202-005 FRONT BUMPER EXTENSION
LENGTH
Frt Bumper Extension Length 21" 1
O 2206-012 FRONT BUMPER PAINT Frt Bumper Paint Primary/Lower Cab Color w/Bedliner Black Bumper Trim
1 O 2227-024 FRONT BUMPER TRIM Frt Bumper Trim SS Ptd Wide Band Frt Top Edge/Corners Abv Apron w/Iso Washers
1 S 2208-006 FRONT BUMPER APRON Frt Bumper Apron For 21" Extension 1 O 2237-005 FRONT BUMPER DISCHARGE Front Bumper Discharge 2.5" LH Frame Mnt Plumbing 1 O 2211-075 FRONT BUMPER
COMPARTMENT CENTER
Frt Bumper Cmpt Ctr Full Size 38.00"Wx10.88"D
w/LH Notched Cover
1 O 2210-002 FRONT BUMPER
COMPARTMENT COVER
HARDWARE
Frt Bumper Cmpt Cover Hardware Gas
Cylinder/D-Ring
1 O 5503-022 MECHANICAL SIREN Mechanical Siren Federal Signal Q2B Pedestal Mnt 1 O 2218-005 MECHANICAL SIREN
LOCATION
Mech Siren Location Frt Bmpr Apron RH OB 1
S 5501-020 AIR HORN Air Horn (2) 21" Round Hadley E-Tone 1 O 2216-011 AIR HORN LOCATION Air Horn Location (2) Frt Bmpr Face R/L OB 1 O 2232-003 AIR HORN RESERVOIR Air Horn Reservoir (1) 2084 Cu In 1 O 5504-030 ELECTRONIC SIREN SPEAKER Elect Siren Speaker (2) 100W Cast Products SA4301 1 O 2217-010 ELECTRONIC SIREN SPEAKER
LOCATION
Elec Siren Speaker Location (2) Frt Bmpr Face R/L IB 1
9.a
Packet Pg. 249 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) O 2203-002 FRONT BUMPER TOW HOOKS Frt Bumper Tow Hooks Painted Below Fwd 1
CAB TILT
O 2310-002 CAB HEIGHT ADJUSTMENT Cab Height Adjustment 0.75" 1 O 2301-001 CAB TILT SYSTEM Cab Tilt System 1
O 2302-005 CAB TILT AUXILIARY PUMP Cab Tilt Aux Pump Manual Mnt w/Tilt Pump 1 O 2303-003 CAB TILT LIMIT SWITCH Cab Tilt Limit Sw Preset Limit 1 O 2305-003 CAB TILT CONTROL
RECEPTACLE
Cab Tilt Ctrl Receptacle For Customer Install In Body 1 S 2306-002 CAB TILT LOCK DOWN
INDICATOR
Cab Tilt Lock Down Indicator 1
CAB GLASS
S 1401-009 CAB WINDSHIELD Cab Windshield 1
O 1402-002 GLASS FRONT DOOR Glass Frt Dr Pwr 1
O 1407-002 GLASS TINT FRONT DOOR Glass Tint Frt Dr Automotive Dark Gray 1 O 1419-008 GLASS REAR DOOR RIGHT
HAND
Glass Rr Dr RH Pwr 1
O 1430-002 GLASS TINT REAR DOOR
RIGHT HAND
Glass Tint Rr Door RH Automotive Dark Gray 1
O 1412-008 GLASS REAR DOOR LEFT HANDGlass Rr Dr LH Pwr 1 O 1431-002 GLASS TINT REAR DOOR LEFT
HAND
Glass Tint Rr Door LH Automotive Dark Gray 1
O 1410-010 GLASS SIDE MID RIGHT HAND Glass Side Mid RH Fxd 16"W x 12"H 1 O 1432-002 GLASS TINT SIDE MID RIGHT
HAND
Glass Tint Side Mid RH Automotive Dark Gray 1
S 1409-003 GLASS SIDE MID LEFT HAND Glass Side Mid LH Fxd 16"W x 26"H 1 O 1433-002 GLASS TINT SIDE MID LEFT
HAND
Glass Tint Side Mid LH Automotive Dark Gray 1
CLIMATE CONTROL
O 1614-202 CLIMATE CONTROL Climate Ctrl Htr Defroster A/C SGM Ovrhd Alum 1 S 1632-002 CLIMATE CONTROL DRAIN Climate Control Drain Gravity 1 S 1617-201 CLIMATE CONTROL
ACTIVATION
Climate Ctrl Actv Rotary Dash Mnt Ctr 1
O 1620-019 HVAC OVERHEAD COVER
PAINT
HVAC Overhead Cover Paint Multi-tone Onyx Black 1
O 1603-002 A/C CONDENSER LOCATION A/C Condenser Location Roof Mnt Mid LH 1 S 1601-013 A/C COMPRESSOR A/C Compressor TM-31/QP-31 1
O 1530-104 UNDER CAB INSULATION Under Cab Insulation Eng Tnl & Cab Floor w/Removable Alum Tunnel Overlay
1 CAB INTERIOR
O 1327-015 INTERIOR TRIM FLOOR Interior Trim Floor w/TPlt Trim 1 S 1302-001 INTERIOR TRIM Interior Trim Vinyl 1
S 1368-002 REAR WALL INTERIOR TRIM Rear Wall Interior Trim Vinyl 1 S 1306-006 HEADER TRIM Header Trim XDuty 1
S 1305-015 TRIM CENTER DASH Trim Center Dash XDuty w/Gas Cylinder Stay 1 S 1339-102 TRIM LEFT HAND DASH Trim LH Dash XDuty 1
S 1321-030 TRIM RIGHT HAND DASH Trim RH Dash XDuty Glove Cmpt/MDT Prov/4.50"H Glovebox
1 S 1307-002 ENGINE TUNNEL TRIM Eng Tnl Trim Flr Mat 1
O 5040-200 POWER POINT DASH MOUNT Pwr Pnt Dash Mnt Batt Dir (2) Powerwerx Comb USB/Type-C Sw Pnl No Ind Lt
1 S 1303-039 STEP TRIM Step Trim Embossed & Diamond Cut SS Lwr, TPlt Mid
1 9.a
Packet Pg. 250 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) O 1336-002 STEP TRIM KICKPLATE Step Trim Kickplate Treadplate 1 S 1379-003 UNDER CAB ACCESS DOOR Under Cab Access Door Rear Step LH Painted 1 S 1102-013 INTERIOR DOOR TRIM Interior Door Trim Painted 1 O 1105-008 CAB DOOR TRIM REFLECTIVE Remove Cab Door Trim Reflective 1 S 1308-001 INTERIOR GRAB HANDLE "A"
PILLAR
Interior Grab Handle 'A' Pillar 11" Molded 1
O 1332-029 INTERIOR GRAB HANDLE
FRONT DOOR
Interior Grab Handle Frt Door Horiz 9"/Vert 9" DA
Sanded
1 O 1345-008 INTERIOR GRAB HANDLE
REAR DOOR
Int Grab Handle Rr Dr Alum Window Span 30" DA
Sanded
1 S 1301-003 INTERIOR SOFT TRIM COLOR Interior Soft Trim Color Gray 1 S 1337-001 INTERIOR TRIM SUNVISOR Interior Trim Sunvisor Vinyl 1 S 1304-001 INTERIOR FLOOR MAT COLOR Interior Floor Mat Color Gray 1 O 1335-018 CAB PAINT INTERIOR DOOR
TRIM
Cab Paint Int Dr Trim Multi-tone Onyx Black 1
O 1371-021 HEADER TRIM INTERIOR
PAINT
Header Trim Interior Paint Multi-tone Onyx Black 1
O 1370-023 TRIM CENTER DASH INTERIOR
PAINT
Trim Center Dash Interior Paint Multi-tone Onyx
Black
1 O 1378-022 TRIM LEFT HAND DASH
INTERIOR PAINT
Trim LH Dash Interior Paint Multi-tone Onyx Black 1
O 1373-022 TRIM RIGHT HAND DASH
INTERIOR PAINT
Trim RH Dash Interior Paint Multi-tone Onyx Black 1
O 1344-009 DASH PANEL GROUP Dash Pnl Group 3-Pnl w/Black Textured Aluminum Panels
1 O 1312-001 SWITCHES CENTER PANEL Switches Ctr Pnl 0 1 O 1313-023 SWITCHES LEFT PANEL Switches Left Pnl 5 (3+2) Wiper Only 1 O 1314-012 SWITCHES RIGHT PANEL Switches Right Pnl 6 (3+3) 1
CAB SEATS
S 1225-007 SEAT BELT WARNING Seat Belt Warn Disp w/VDR 1 O 1237-006 SEAT MATERIAL Seat Material USSC Ballistic w/VALORTech XD 1 O 1243-003 SEAT COLOR Seat Color Black/Red Seat Belts 1 O 1201-036 SEAT DRIVER Seat Driver USSC Valor 4-Way Air ABTS w/S4S Integrated Suspension
1 O 1213-024 SEAT BACK DRIVER Seat Back Driver Non-SCBA ABTS Reclining 1 S 1219-001 SEAT MOUNTING DRIVER Seat Mounting Driver 1
O 8102-201 OCCUPANT PROTECTION
DRIVER
Occupant Protection Driver 4Front & Air Seat RollTek
w/SRA
1 O 1202-052 SEAT OFFICER Seat Officer USSC Valor 4-Way Air ABTS w/S4S Integrated Suspension
1 O 1214-027 SEAT BACK OFFICER Seat Back Officer Non-SCBA ABTS Reclining 1 S 1220-002 SEAT MOUNTING OFFICER Seat Mounting Officer 1 O 8103-201 OCCUPANT PROTECTION
OFFICER
Occupant Protection Officer 4Front & Air Seat
RollTek w/SRA
1 S 1273-001 SEAT BELT ORIENTATION
CREW
Seat Belt Orientation Crew Outboard Shoulder To
Inboard Hip
1 O 1265-001 SEAT FORWARD FACING
OUTER LOCATION
Seat FFO Location Primary Pos (2) R/L 1
O 1205-011 SEAT CREW FORWARD FACING
OUTER
Seat Crew FFO Flip-Up Theatre Style 2
O 1217-016 SEAT BACK FORWARD FACING
OUTER
Seat Back FFO None Theatre Style 2
O 1223-002 SEAT MOUNTING FORWARD
FACING OUTER
Seat Mounting FFO Outboard 1
O 8106-102 OCCUPANT PROTECTION FFO Occupant Protection FFO RollTek Belt Pretensioner 1 S 1266-001 SEAT FORWARD FACING
CENTER LOCATION
Seat FFC Location Secondary Pos (2) Ctr 1
O 1206-032 SEAT CREW FORWARD FACING
CENTER
Seat Crew FFC USSC Valor Flip-Up 2
O 1218-035 SEAT BACK FORWARD FACING
CENTER
Seat Back FFC SCBA IMMI SmartDock 2
9.a
Packet Pg. 251 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) S 8107-101 OCCUPANT PROTECTION FFC Occupant Protection FFC RollTek Belt Pretensioner 1 S 1269-101 SEAT FRAME FORWARD
FACING
Seat Frm Fwd Fcg Dual Width 1
S 1281-101 SEAT FRAME FORWARD
FACING STORAGE ACCESS
Seat Frm Fwd Fcg Strg Acc Dr (2) R/L Sd 1
S 1224-002 SEAT MOUNTING FORWARD
FACING CENTER
Seat Mounting Forward Facing Center 1
O 1355-023 SEAT COMPARTMENT DOOR
FINISH
Seat Compartment Door Finish Multi-tone Onyx Black 1
CAB EXTERIOR
O 1511-203 WINDSHIELD WIPER SYSTEM Windshield Wiper System, Prk Brk Interlock w/Disp Override
1 S 1534-002 ELECTRONIC WINDSHIELD
FLUID LEVEL INDICATOR
Electronic Windshield Fluid Level Indicator 1
O 1103-012 CAB DOOR HARDWARE Cab Door Hardware Black 1
O 1111-004 DOOR LOCKS Door Locks Power (4) Entry Doors 1 O 1113-003 DOOR LOCK LH EMS
COMPARTMENT
Door Lock LH EMS Compartment Hng Power 1
O 1114-003 DOOR LOCK RH EMS
COMPARTMENT
Door Lock RH EMS Compartment Hng Power 1
O 1112-004 POWER DOOR LOCK
COMPARTMENT ACTIVATION
Power Door Lock Cmpt Actv Key Fob & Keypads 1
O 1503-209 GRAB HANDLES Grab Handles 3-Pc Alum Knurled 18" w/Red Reflective
1 O 1503D-00
3 LIGHTED EXTERIOR GRAB
HANDLES
Lighted Grab Handles Clear LED 1
S 1504-014 REARVIEW MIRRORS Mirror Aerodynamic Retrac 613305 Rmt Htd 1 S 1529-003 REARVIEW MIRROR HEAT
SWITCH
Rearview Mirror Heat Sw Disp 1
O 1525-008 EXTERIOR TRIM REAR
CORNER
Exterior Trim Rear Corner Treadplate Wide 1
O 1513-025 CAB FENDER Cab Fender SS 1
S 1514-002 MUD FLAPS FRONT Mud Flaps Frt 1
O 1526-031 CAB EXTERIOR FRONT & SIDE
EMBLEMS
Cab Ext Frt & Side Emblems Spartan w/Side Shiploose 1
S 1502-052 CAB EXTERIOR MODEL
NAMEPLATE
Cab Exterior Model Nameplate Gladiator 1
START / CHARGING SYSTEMS
S 5109-015 IGNITION Ign Mstr Rkr Sw w/Push-Button Start 1 O 5101-021 BATTERY Batt (6) Group 31 Harris 1
S 5106-003 BATTERY TRAY Batt Tray (2) R/L Steel 1
O 5107-007 BATTERY BOX COVER Batt Box Cover (2) Steel w/Black Handles 1 S 5102-001 BATTERY CABLE Batt Cables 1
S 5108-010 BATTERY JUMPER STUD Batt Jumper Stud Frt LH Lwr Step 8" Apart 1 O 5104-024 ALTERNATOR Alternator Leece-Neville 350A 1
S 5105-001 STARTER MOTOR Starter Motor Delco 1
LINE VOLTAGE ELECTRICAL POWER DISTRIBUTION
O 5202-400 BATTERY CONDITIONER Batt Cond Kussmaul Chief 4012 40A 1 O 5218-008 BATTERY CONDITIONER
LOCATION
Batt Cond Loc Top of LH EMS Cmpt 1
O 5203-201 BATTERY CONDITIONER
DISPLAY
Batt Cond Display Chief Remote Control Panel (RCP) 1
O 5220-010 BATTERY CONDITIONER
DISPLAY LOCATION
Batt Cond Display Location LH Mid Frt Step Rwd 1
O 5209-039 ELECTRICAL INLET LOCATIONElec Inlet Location LH Cab Side Fwd Mid 1
9.a
Packet Pg. 252 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) S 5204-055 ELECTRICAL INLET Elec Inlet 120V 20A Auto Eject 1 O 5210-004 ELECTRICAL INLET
CONNECTION
Elec Inlet Conn to Batt Conditioner 1
O 5206-013 ELECTRICAL INLET COLOR Elec Inlet Color Black 1
LIGHTING
O 5301-106 HEADLIGHTS Headlights 4 Headlamps LED, Firetech FT-4X6-4KIT 1 S 5337-001 HEADLIGHT LOCATION Headlights Below Frt Warn Lts 1 O 5303-044 FRONT TURN SIGNALS Frt Turn Signals Whelen M6 LED Above Frt Warn Rad Mnt w/Clr Lens Blk Housing
1 O 5336-019 SIDE TURN/MARKER LIGHTS Side Turn/Marker Lts LED Tecniq S170 w/Clr Lens & Blk Bezel
1 O 5302-027 MARKER & ICC LIGHTS Marker & ICC Lts Face Mnt LED Tecniq S170 w/Blk Bezel/Clr Lens
1 O 5350-104 HEADLIGHT AND MARKER
LIGHT ACTIVATION
Hdlt & Mrkr Lt Actv Disp/Halo w/Mrkr Lts/Ign Sw 1
O 5305-353 INTERIOR OVERHEAD LIGHTS Interior Overhead Lts Whelen 6" Red/Clear LED 1 S 5388-003 INTERIOR OVERHEAD
LIGHTING ACTIVATION
Int Ovrhd Lt Actv Resp Dr & Disp 1
O 5403-051 LIGHTBAR PROVISION Lightbar Prov Wire & Mnt (2) Chassis Supply 1 O 5450N-00
6 CAB FRONT LIGHTBAR MODEL Cab Front Lightbar Model Whelen F4NMINI (2) 1 S 5450-999 CAB FRONT LIGHTBAR Cab Front Lightbar - Configured in 5450M Subcategory
1 S 5450M-0
02 FRONT LIGHTBAR LAYOUT Cab Front Lightbar Layout 1
O 5450X-00
3 FRONT LIGHTBAR
ORIENTATION
Front Lightbar Orientation - Outboard/Aerial Mnt 1
O 5450L2-0
02 FRONT LIGHTBAR LIGHT
POSITION 2
Cab Front Lightbar Position 2 - Red LH Side 1
O 5450L4-0
03 FRONT LIGHTBAR LIGHT
POSITION 4
Cab Front Lightbar Position 4 - White 1
O 5450L5-0
03 FRONT LIGHTBAR LIGHT
POSITION 5
Cab Front Lightbar Position 5 - White 1
O 5450L12-
003
FRONT LIGHTBAR LIGHT
POSITION 12
Cab Front Lightbar Position 12 - White 1
O 5450L13-
003
FRONT LIGHTBAR LIGHT
POSITION 13
Cab Front Lightbar Position 13 - White 1
O 5450L15-
032
FRONT LIGHTBAR LIGHT
POSITION 15
Cab Front Lightbar Position 15 - Red RH Side 1
O 5426-003 LIGHTBAR SWITCH Lightbar Sw Disp 1
O 5317-195 FRONT SCENE LIGHTS Frt Scene Lts Whelen Pioneer 12V LED PFH1 Black (2)
1 O 5329-006 FRONT SCENE LIGHT
LOCATION
Frt Scene Lt Loc (2) Outboard Brow Pos 1
O 5335-022 FRONT SCENE LIGHTS
ACTIVATION
Frt Scene Lts Actv Disp & Lighted Momentary Rkr Sw 1
O 5306-112 SIDE SCENE LIGHTS Side Scene Lts Whelen Pioneer LED 12V PCPSM1B Surface Mnt Blk
1 O 5318-003 SIDE SCENE LIGHT LOCATION Side Scene Lt Loc Upper Mid Fwd Flat Roof Position 1 O 5316-033 SIDE SCENE ACTIVATION Side Scene Actv Indv Lighted Momentary Sw, Indv Disp Actv, Resp Side Doors
1 O 5330-035 REAR SCENE LIGHTS Rear Scene Lts Body Mount Provision 1 O 5331-009 REAR SCENE LIGHT
ACTIVATION
Rear Scene Lt Actv Sgl Sw Disp 1
S 5308-300 GROUND LIGHTS Ground Lts Tecniq T44 LED 1
S 5386-004 GROUND LIGHTING
ACTIVATION
Ground Lt Actv Prk Brk, Resp Sd Dr & Disp 1
O 5319-003 UNDER BUMPER LIGHTS Under Bmpr Lts 4" LED Prk Brk & Marker Lts 1 S 5309-003 LOWER CAB STEP LIGHTS Lwr Cab Step Lts Tecniq T44 LED 1 O 5382-007 INTERMEDIATE STEP LIGHTS Intermediate Step Lts Tecniq D06 LED 1 S 5312-003 ENGINE COMPARTMENT Engine Cmpt Work Lt LED (1) 1
9.a
Packet Pg. 253 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) LIGHT
OPTICAL WARNING DEVICES
S 5406-119 DO NOT MOVE APPARATUS
LIGHT
Do Not Move App Lt Flashing Red Tecniq K50 LED
w/Alarm
1 O 5422-020 MASTER WARNING SWITCH Mstr Warn Sw Disp w/Warning Lt Dimmer, Disp Dim & Prk Brk Interlock
1 S 5409-002 HEADLIGHT FLASHER Headlight Flasher Alternating 1 S 5425-003 HEADLIGHT FLASHER SWITCH Headlight Flasher Sw Disp 1 O 5401-125 INBOARD FRONT WARNING
LIGHTS
Inboard Frt Warn Lts Whelen M6 LED TripleFlash 75
I/O Pattern Blk Bezel
1 O 5413-003 INBOARD FRONT WARNING
LIGHTS COLOR
Inboard Frt Warn Lts Color Red w/Clr Lens 1
O 5414-101 OUTBOARD FRONT WARNING
LIGHTS
Outboard Frt Warn Lts Whelen M6 LED TripleFlash
75 I/O Pattern Blk Flg Adapter
1 O 5415-003 OUTBOARD FRONT WARNING
LIGHTS COLOR
Outboard Frt Warn Lts Color Red w/Clr Lens 1
O 5432-225 BUMPER FACE WARNING
LIGHT
Bmpr Face Warn Lt Whelen M6 LED TripleFlash 75
I/O Pattern Blk Bzl
1 O 5433-004 BUMPER FACE WARNING
LIGHT COLOR
Bmpr Face Warn Lt Color Red w/Clear Lens 1
O 5474-005 BUMPER FACE WARN
LOCATION
Bmpr Face Warn Lt Location Ctr R/L OB 1
O 5423-003 FRONT WARNING SWITCH Frt Warn Sw Disp 1
O 5404-150 INTERSECTION WARNING
LIGHTS
Intersection Warn Lts Whelen M6 LED TripleFlash 75
I/O Pattern Blk Bezel
1 O 5419-003 INTERSECTION WARNING
LIGHTS COLOR
Int Warn Lts Color Red w/Clr Lens 1
O 5420-007 INTERSECTION WARNING
LIGHTS LOCATION
Intersection Warn Lts Location Bumper Tail Ctr
Position
1 O 5402-134 SIDE WARNING LIGHTS Side Warn Lts Whelen M6 LED TripleFlash 75 I/O Pattern Blk Bezel
1 O 5418-003 SIDE WARNING LIGHTS COLORSide Warn Lts Color Red w/Clr Lens 1 O 5412-009 SIDE WARNING LIGHTS
LOCATION
Side Warn Lts Location Lwr Mid Fwd Position 1
O 5424-003 SIDE AND INTERSECTION
WARNING SWITCH
Side & Intersection Warn Sw Disp 1
O 5469-002 TANK LEVEL LIGHTS Tank Lvl Lts FRC Max Vision 1 O 5470-002 TANK LEVEL LIGHTS
ACTIVATION
Tank Lvl Lights Actv Prewire Rear of Cab 1
O 5471-003 TANK LEVEL LIGHTS
LOCATION
Tank Lvl Lights Loc Rear Cab Sides Centered 1
O 5449-034 REAR WARNING LIGHTS Rr Warn Lts LH IB Overhead Whelen TACTL5 Cont & TAL65 Advsr Shplse
1 O 5407-019 INTERIOR DOOR OPEN
WARNING LIGHTS
Int Dr Open Warn Lts Amber Weldon 15" LED Dir
Flsh
1 AUDIBLE WARNING DEVICES
O 5510-079 SIREN CONTROL HEAD Siren Ctrl Head Whelen 295HFSC9 1 O 5514-102 STEERING WHEEL HORN
BUTTON SELECTOR SWITCH
Horn Btn Sel Sw Elec Horn/Air Horn Disp Def Air
Horn On
1 O 5526-004 AUDIBLE WARNING LH FOOT
SWITCH
Audible Warning LH Foot Switch Siren 1
O 5526D-00
1 MECHANICAL SIREN FOOT
SWITCH LH
Mechanical Siren Foot Switch LH Linemaster 491-S 1
O 5526E-00
1 MECHANICAL SIREN FOOT
SWITCH LH LOCATION
Mechanical Foot Switch LH Location A-Pillar 1
O 5526F-00
1 MECHANICAL SIREN FOOT
SWITCH LH POSITION
Mechanical Siren Foot Switch Position Outboard of
Other Foot Switches
1 O 5529-002 AUDIBLE WARNING LH FOOT Audible Warn LH Ft Sw Double Brkt 30Deg TPlate 1
9.a
Packet Pg. 254 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
SWITCH BRACKET
O 5512-217 AIR HORN AUXILIARY
ACTIVATION
Air Horn Actv Rkr Sw 1
O 5513-506 MECHANICAL SIREN
BRAKE/AUXILIARY
ACTIVATION
Mech Siren Actv Rkr Sw/Brk Sw/Brk Sw Disp 1
O 5532-001 MECHANICAL SIREN
INTERLOCK
Mechanical Siren Interlock Master Warn Only 1
S 5505-002 BACK-UP ALARM Back-Up Alarm Ecco 575 1
INSTRUMENTATION
O 5601-041 INSTRUMENTATION Instrumentation Standard 1
O 5624-003 BACKLIGHTING COLOR Backlighting Color White 1
COMMUNICATIONS SYSTEMS
O 5701-300 RADIO Radio Jensen WB/AM/FM/BT 1
O 5736-100 RADIO LOCATION Radio Overhead LH 1
O 5707-002 AM/FM ANTENNA AM/FM Antenna LH Fwd Cab Roof 1 O 5737-200 RADIO SPEAKERS Radio Speakers (4) Front/Rear 1 O 5727-002 CAMERA RIGHT HAND Camera RH Teardrop 1
O 5728-012 CAMERA REAR Camera HD Rear Box w/o Speaker 1 O 5731-004 CAMERA DISPLAY Camera Display on Disp 1
O 5703-010 COMMUNICATION ANTENNA Comm Ant Base RH Fwd Cab Rf Chassis Sply 1 O 5708-003 COMMUNICATION ANTENNA
CABLE ROUTING
Comm Ant Cable Routing Under Rkr Sw Pnl 1
O 5709-003 AUXILIARY COMMUNICATION
ANTENNA
Aux Comm Ant Base LH Fwd Cab Roof Chassis Sply 1
O 5710-002 AUXILIARY COMMUNICATION
ANTENNA CABLE ROUTING
Aux Comm Ant Cable Routing Under RH Frt Seat 1
O 5702-068 TWO-WAY RADIOS Two-Way Radio Cutout RH Ovrhd/Ext Cond Undr RH Seat & Dash to Bhd Cab w/25' Coil
1 S 5020-002 PANEL LAYOUT Panel Layout 1
ADDITIONAL EQUIPMENT
S 8806-001 FIRE EXTINGUISHER Fire Extinguisher Shiploose 1 O 8807-002 ROAD SAFETY KIT Road Safety Kit Shiploose 1
S 8810-001 DOOR KEYS Door Keys for Manual Locks (4) 1
SALES ADMIN
O 8030-021 CHASSIS OPERATION MANUAL Chassis Operation Manual w/On-Board USB Storage 1 S 8031-024 ENGINE & TRANSMISSION
OPERATION MANUAL
Eng & Trans Operation Man Eng Hard Copy/Trans
Digital/Eng Owner Digital
1 O 8805-019 CAB/CHASSIS AS BUILT
WIRING DIAGRAMS
Cab/Chassis As Built Wiring Diagrams w/On-Board
USB Storage
1 S 8039-001 SALES TERMS Sales Terms 1
9.a
Packet Pg. 255 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Front Lightbar Layout
5450M-002 Cab Front Lightbar Layout
9.a
Packet Pg. 256 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Option Description
NO Cab Front Lightbar Position 1 Filter
NO Cab Front Lightbar Position 2 Filter
NO Cab Front Lightbar Position 3 Filter
NO Cab Front Lightbar Position 4 Filter
NO Cab Front Lightbar Position 5 Filter
NO Cab Front Lightbar Position 6 Filter
NO Cab Front Lightbar Position 11 Filter
NO Cab Front Lightbar Position 12 Filter
NO Cab Front Lightbar Position 13 Filter
NO Cab Front Lightbar Position 14 Filter
NO Cab Front Lightbar Position 15 Filter RH Side
NO Cab Front Lightbar Position 16 Filter Rear RH Corner NO Cab Front Lightbar Position 7 Filter RH Side
NO Cab Front Lightbar Position 8 Filter Rear RH Corner
NO Cab Front Lightbar Position 9 Filter Rear LH Corner
NO Cab Front Lightbar Position 10 Filter LH Side
Cab Front Lightbar Position 1 - Blank Rear LH Corner
Cab Front Lightbar Position 2 - Red LH Side
Cab Front Lightbar Position 3 - Red Front LH Corner
Cab Front Lightbar Position 4 - White
Cab Front Lightbar Position 5 - White
Cab Front Lightbar Position 6 - Red Front RH Corner
Cab Front Lightbar Position 7 - Blank RH Side
Cab Front Lightbar Position 8 - Blank RH Corner
Cab Front Lightbar Position 10 - Blank LH Side
Cab Front Lightbar Position 9 - Blank Rear LH Corner
Cab Front Lightbar Position 11 - Red Front LH Corner
Cab Front Lightbar Position 12 - White
Cab Front Lightbar Position 13 - White
Cab Front Lightbar Position 14 - Red Front RH Corner
Cab Front Lightbar Position 15 - Red RH Side
Cab Front Lightbar Position 16 - Blank Rear RH Corner
FRONT LIGHTBAR LEGEND INSERT
9.a
Packet Pg. 257 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Panel Layout
5020-002 Panel Layout
9.a
Packet Pg. 258 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Option Description
SWITCH PANEL - MISC PANELS
LEGEND LOCATION
CLIMATE CTRLS CTR DASH ABS ROTARY SGM S180
SIREN CONTROL HEAD WHELEN 295HFSC9 LOW CTR 99"
SWITCH PANEL RH 6 (3+3) S-180 MODELS
PWR POINT DASH MNT BATT DIR DUAL USB 1.13" HOLE SW PNL
PWR POINT DASH MNT BATT DIR DUAL USB 1.13" HOLE SW PNL
VEHICLE DISPLAY UV780 DRIVER DASH PNL
SWITCH PANEL LH (5) [3+2] SWITCHES 2010 94"
LH PTO 'AERIAL MASTER'
PTO AERIAL CONTROL RKR ACTV 'AERIAL PTO'
LEFT MOMENTARY DC SCENE
FRONT SCENE LIGHT ACTIVATION LIGHTED MOMENTARY RKR SW PNL AUX ENGINE BRAKE CONTROL OFF/LOW/HIGH SWITCH PANEL 99"
AIR HORN RKR SW ACTV
REAR AXLE DRIVER CONTROL INTERAXLE LOCK SW
RIGHT MOMENTARY DC SCENE
WINDSHIELD WIPER SYSTEM SINGLE MOTOR
MECH SIREN BRK RKR SW
MECH SIREN RKR SW
9.a
Packet Pg. 259 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) 1314A-039 SWITCH PANEL RH 6 (3+3) S-180 MODELS
Port Info
Port Label Connected From
2933-NN2-062 (AIR HORN) 5512C-001/5020PRT-025
2933-NN2-035 (SIREN) 5513C-007/5020PRT-025
2933-NN2-007 (SIREN BRAKE) 5513A-001/5020PRT-025
2933-NN2-214 (FRONT DC SCENE) 5335A-005/5020PRT-025
2933-NN2-146 (LEFT DC SCENE) 5316B-004/5020PRT-025
2933-NN2-147 (RIGHT DC SCENE) 5316A-007/5020PRT-025
9.a
Packet Pg. 260 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) 1313A-020 SWITCH PANEL LH (5) [3+2] SWITCHES 2010 94"
Port Info
Port Label Connected From
2933-NN2-245 (ENG AUX BRK HIGH / LOW /
OFF)
1708A-008/5020PRT-025
2933-NN2-011 (AERIAL PTO) 2009A-017/5020PRT-025
2933-NN2-437 (AERIAL MASTER) 2009B-004/5020PRT-025
2933-NN2-192 (INTERAXLE) 3407A-001/5020PRT-025
WIPER 1511A-003/5020PRT-025
9.a
Packet Pg. 261 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Weight Distribution
Calculated Apparatus Weight26,531 lbs.
Calculated Apparatus Z-CG 73 in.
Calculated Apparatus Y-CG -2.63 in.
Note:
The Y-CG value above is calculated from the top of the frame.
Apparatus refers to total combined value for cab and chassis and OEM inputs.
9.a
Packet Pg. 262 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Seat Locations
9.a
Packet Pg. 263 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Frame Dimensions
9.a
Packet Pg. 264 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Turning Radius
End User Name
Chassis Model 0100-012 Gladiator
Wheelbase 233.00 in
Bumper Extension 21.00 in
Bumper Width 104.40 in
Left hand outside tire turn angle 30.90 deg
Right hand outside tire turn angle 31.30 deg
Left hand Curb-to-Curb turning radius 36.10 ft, 11.00 m Right hand Curb-to-Curb turning radius 36.47 ft, 11.12 m Left hand Wall-to-Wall turning radius 40.55 ft, 12.36 m Right hand Wall-to-Wall turning radius 40.89 ft, 12.46 m
9.a
Packet Pg. 265 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Cab Glass
9.a
Packet Pg. 266 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Specification
MODEL
The chassis shall be a Gladiator model. The cab and chassis shall include design considerations for multiple emergency vehicle applications, rapid transit and maneuverability. The chassis shall be manufactured for heavy duty service with the strength and capacity to support a fully laden apparatus, one hundred (100) percent of the time.
MODEL YEAR
The chassis shall have a vehicle identification number that reflects a 2028 model year.
COUNTRY OF SERVICE
The chassis shall be put in service in the country of United States of America (USA).
The chassis will meet applicable U.S.A. federal motor vehicle safety standards per CFR Title 49 Chapter V Part 571 as clarified in the incomplete vehicle book per CFR Title 49 Chapter V Part 568 Section 4 which accompanies each chassis. The chassis manufacturer is not responsible for compliance to state, regional, or local regulations. Dealers should identify those regulations and order any necessary optional equipment from the chassis manufacturer or their OEM needed to be in compliance with those regulations.
EMISSIONS CERTIFICATION LEVEL
The cab and chassis shall be designed and built to the standards and requirements of the United States Environmental Protection Agency (EPA). The design, testing, service, and manufacturing process shall be certified compliant to these standards and requirements set forth by the agency to meet the regulated level of exhaust emissions for the model manufactured year 2027. The chassis shall also be certified to comply with the EPA model year 2027 greenhouse gas regulations for CO2 emissions. Compliance shall be granted with legacy 2026 model year engine platforms.
CAB AND CHASSIS LABELING LANGUAGE
The cab and chassis shall include the applicable caution, warning, and safety notice labels with text to be written in English. All applicable caution, warning, and safety notice labels shall be Innovative Controls brand. Where applicable to the location within the specific layout and label package of the cab and chassis, the labels shall include decorative chrome bezels. Designs shall include bezels that fit individual labels or packaged configurations of labels in certain common locations.
APPARATUS TYPE
The apparatus shall be a Quint vehicle designed for emergency service use. The apparatus shall include a permanently mounted fire pump which has a minimum rated capacity of 750 gallons per minute (3000 L/min), a water tank, a hose storage area, a compliment of ground ladders, and an aerial ladder or elevating platform with a permanently mounted waterway that shall be rear mounted thus providing the following vehicle benefits:
Improved mobility vs. mid-ship mounted units, due to shorter overall travel length and wheelbase.
9.a
Packet Pg. 267 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Increased compartment space, hose load, and water capacity in the body, resulting from ladder being raised to clear the cab.
Shorter vehicle wheelbase.
Shorter overall length of vehicle.
VEHICLE TYPE
The chassis shall be manufactured for use as a straight truck type vehicle and designed for the installation of a permanently mounted apparatus behind the cab. The apparatus of the vehicle shall be supplied and installed by the apparatus manufacturer.
VEHICLE ANGLE OF APPROACH PACKAGE
The angle of approach of the apparatus shall be a minimum of 8.00 degrees.
NFPA1901 Angle of Approach definition:
"To determine the angle of approach, place a thin steel strip against the front of the tires where they touch the ground or stretch a tight string from one front tire to the other at the front where they touch the ground. Determine the lowest point (component or equipment) on the vehicle forward of the front tire that would make the smallest angle of approach. Hang a plumb bob from the lowest point and mark the point on the ground where the point of the plumb bob touches. Measure the vertical distance from the ground to the point where the plumb bob was hung (distance V). Measure the horizontal distance from the plumb bob point to the steel strip or string running from front tire to front tire (distance H). Divide the vertical distance by the horizontal distance. The ratio of V/H is the tangent of the angle of approach.
If the ratio is known, the angle of approach can be determined from a table of trigonometric functions of angles or from a math calculator. The standard requires a minimum angle of approach of 8.00 degrees:
since the tangent of 8.00 degrees is 0.1405, if V divided by H is 0.1405 or larger, the angle of approach is 8.00 degrees or greater."
AXLE CONFIGURATION
The chassis shall feature a 6 x 4 axle configuration consisting of a tandem rear drive axle set with a single front steer axle.
GROSS AXLE WEIGHT RATINGS FRONT
The front gross axle weight rating (GAWR) of the chassis shall be 24,000 pounds.
This front gross axle weight rating shall be adequate to carry the weight of the completed apparatus including all equipment and personnel.
GROSS AXLE WEIGHT RATINGS REAR
The rear gross axle weight rating (GAWR) of the chassis shall be 52,000 pounds.
This rear gross axle weight rating shall be adequate to carry the weight of the completed apparatus including all equipment and personnel.
PUMP PROVISION
The chassis shall include provisions to mount a drive line pump in the middle of the chassis, behind the cab, more commonly known as the midship location. Chassis driveline pump provisions shall include an
9.a
Packet Pg. 268 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) interlock feature for automatic setting of the park brake when the vehicle is shifted into pump mode while the transmission is in neutral and the transmission output speed translates to less than 1 mph.
When the conditions are met the driver side parking brake valve shall activate. Once shifted to road mode the condition for electric automatic brake engagement is no longer present and the drivers parking brake control valve shall function normally.
WATER & FOAM TANK CAPACITY
The chassis shall include a carrying capacity of up to 750 gallons (2839 liters). The water and/or foam tank(s) shall be supplied and installed by the apparatus manufacturer.
WARRANTY
Purchaser shall receive a Custom Chassis Two (2) Years or 36,000 Miles limited warranty in accordance with, and subject to, warranty certificate RFW0102. The warranty certificate is incorporated by reference into this proposal, and included with this proposal or available upon request.
CAB STYLE
The cab shall be a custom, fully enclosed, EMFD model with a flat roof over the driver, officer, and crew area, designed and built specifically for use as an emergency response vehicle by a company specializing in cab and chassis design for all emergency response applications. The cab shall be designed for heavy-duty service utilizing superior strength and capacity for the application of protecting the occupants of the vehicle. This style of cab shall offer up to eight (8) seating positions.
The cab shall incorporate a fully enclosed design with side wall roof supports, allowing for a spacious cab area with no partition between the front and rear sections of the cab. To provide a superior finish by reducing welds that fatigue cab metal; the roof, the rear wall and side wall panels shall be assembled using a combination of welds and proven industrial adhesives designed specifically for aluminum fabrication for construction.
The cab shall be constructed using multiple aluminum extrusions in conjunction with aluminum plate, which shall provide proven strength and the truest, flattest body surfaces ensuring less expensive paint repairs if needed. All aluminum welding shall be completed to the American Welding Society and ANSI D1.2-96 requirements for structural welding of aluminum.
All interior and exterior seams shall be sealed for optimum noise reduction and to provide the most favorable efficiency for heating and cooling retention.
The cab shall be constructed of 5052-H32 corrosion resistant aluminum plate. The cab shall incorporate tongue and groove fitted 6061-T6 0.13 & 0.19 inch thick aluminum extrusions for extreme duty situations. A single formed, one (1) piece extrusion shall be used for the "A" pillar, adding strength and rigidity to the cab as well as additional roll-over protection. The cab side walls and roof skin shall be
0.13 inch thick; the rear wall skin shall be 0.09 inch thick; the front cab structure shall be 0.19 inch thick.
The exterior width of the cab shall be 99.40 inches wide with a minimum interior width of 91.00 inches.
The overall cab length shall be 137.10 inches with 60.00 inches from the centerline of the front of the axle to the back of the cab.
9.a
Packet Pg. 269 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The cab interior shall be designed to afford the maximum usable interior space and attention to ergonomics with hip and legroom while seated which exceeds industry standards. The crew cab floor shall be flat across the entire walking area for ease of movement inside the cab.
The cab shall offer an interior height of 57.50 inches from the front floor to the headliner and a rear floor to headliner height of 55.00 inches at a minimum. The cab shall offer an interior measurement at the floor level from the rear of the engine tunnel to the rear wall of the cab of 55.88 inches. All interior measurements shall include the area within the interior trimmed surfaces and not to any unfinished surface.
The cab shall include a driver and officer area with two (2) cab doors large enough for personnel in full firefighting gear. The front doors shall offer a clear opening of 40.25 inches wide X 53.50 inches high, from the cab floor to the top of the door opening. The cab shall also include a crew area with up to two (2) cab doors, also large enough for personnel in full firefighting gear. The rear doors shall offer a clear opening of 32.25 inches wide X 51.00 inches high, from the cab floor to the top of the door opening.
The cab shall incorporate a progressive two (2) step configuration from the ground to the cab floor at each door opening. The progressive steps are vertically staggered and extend the full width of each step well allowing personnel in full firefighting gear to enter and exit the cab easily and safely.
The first step for the driver and officer area shall measure approximately 11.50 inches deep X 31.13 inches wide. The intermediate step shall measure approximately 8.50 inches deep X 32.50 inches wide.
The height from the first step to the intermediate step and the intermediate step to the cab floor shall not exceed 11.00 inches.
The first step for the crew area shall measure approximately 11.50 inches deep X 20.44 inches wide.
The intermediate step shall measure approximately 10.25 inches deep X 22.75 inches wide. The height from the first step to the intermediate step and the intermediate step to the cab floor shall not exceed
12.80 inches.
OCCUPANT PROTECTION
An IMMI 4Front® occupant protection system shall be installed in the vehicles cab. The system shall inflate up to three (3) air bags in the following locations as applicable by customer specification:
Steering wheel air bag to protect the head and neck of the driver Knee bolster air bag to protect the drivers legs
Knee bolster air bag to protect the officers legs
The air bags shall use a combination of high-pressure stored argon and oxygen with a pyrotechnic charge for initiation to inflate the bags remain inflated for several seconds.
The system shall be connected to the crash detection sensor that will also activate the driver and first officer integrated belt pretensioners if it detects a frontal crash. A RollTek rollover occupant protection system shall be installed in the apparatus cab. The system shall include an integrated roll sensor (IRS).
9.a
Packet Pg. 270 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The IRS shall be a microprocessor-controlled solid-state sensing device that utilizes vehicle-specific calibrations to detect rollovers. The IRS shall be equipped with pyrotechnic loops for connection to the protective countermeasures which shall include seat integrated side roll airbags (SRA), integrated seat belt pretensioners, and air seat pull-downs (S4S), in applicable occupant seat positions.
The IRS shall continuously monitor the truck`s acceleration and angle, and upon detection of an imminent roll-over, shall activate protective countermeasures in a pre-programmed sequence. In addition, the IRS shall also act as a data recorder to record crash events for post-crash evaluation.
CAB FRONT FASCIA
The front cab fascia shall be constructed of 5052-H32 Marine Grade, 0.13 of an inch thick aluminum plate which shall be an integral part of the cab.
The cab fascia will encompass the entire front of the aluminum cab structure from the bottom of the windshield to the bottom of the cab and shall be the "Classic" design.
The front cab fascia shall include two (2) molded plastic modules on each side accommodating a total of up to four (4) Hi/Low beam headlights and two (2) turn signal lights or up to four (4) warning lights. A gloss black molded plastic bezel shall be provided on each side around each set of four lamps.
FRONT GRILLE
The front cab fascia shall include a classic box style, 304 stainless steel front grille. The grille shall measure 55.45 wide X 33.50 inches high X 1.50 inches deep. The upper portion of the grille shall be hinged to provide service access behind the grille. The grille shall include a minimum free air intake of 750.00 square inches. The grille and hinge shall be painted gloss black.
CAB UNDERCOAT
There shall be undercoating applied to the underside of the cab which provides an abrasion resistant coating for protection against corrosion caused by moisture, salt, alkalis and galvanic reaction.
CAB SIDE DRIP RAIL
There shall be a drip rail along the top radius of each cab side. The drip rails shall help prevent water from the cab roof running down the cab side.
CAB PAINT EXTERIOR
The cab exterior shall be painted two tone per customers specified paint colors following the RFG-SR-001 paint standards.
CAB PAINT PROCESS/MANUFACTURER
The cab shall be painted with PPG Industries paint prior to the installation of glass accessories and all other cab trim to ensure complete paint coverage and the maximum in corrosion protection of all metal surfaces.
All metal surfaces on the cab shall be mechanically etched by sanding disc to remove any surface oxidation or surface debris which may hinder the paint adhesion. Once all imperfections on the exterior surfaces are removed and sanded smooth, body fillers shall be applied to the cab on all surfaces that require a critically aesthetic finish and sanded smooth.
9.a
Packet Pg. 271 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The entire cab shall then be coated with a high quality base primer that is designed to fill any minor surface defects, provide an adhesive bond between the primer and the paint and improve the color and gloss retention of the color. The finish to this procedure shall be sanding the cab to a smooth finish followed by sealing the seams with an automotive seam sealer. The minimum thickness of the primer coat after sanding shall be 2.50 mils with a maximum thickness of 5.00 mils.
The cab shall then be painted the specific color(s) designated by the customer with an acrylic urethane type system designed to retain color and resist acid rain and most atmospheric chemicals found on an emergency scene. The paint shall have a minimum thickness of 1.00 mils with a maximum of 4 mills, followed by a clear top coat with a minimum of 2.5 mils and a maximum of 3.5 mils. The entire cab shall then be baked to speed the curing process of the coatings.
CAB PAINT PRIMARY/LOWER COLOR
The primary/lower paint color shall be PPG FBCH 926234 red.
CAB PAINT SECONDARY/UPPER COLOR
The secondary/upper paint color shall be PPG FBCH 9000 black.
CAB PAINT EXTERIOR BREAKLINE
The upper and lower paint shall meet at a breakline on the cab which shall be located approximately
1.00 inch below the door windows on each side of the cab. The breakline shall curve down at the front cab corners to approximately 5.00 inches below the windshields on the front of the cab.
CAB PAINT PINSTRIPE
A 0.50 inch wide gold leaf tape with black borders shall be applied on the break line between the two different colored surfaces.
CAB PAINT WARRANTY
Purchaser shall receive a Paint and Finish (Exterior Clear coated) Ten (10) Years limited warranty in accordance with, and subject to, warranty certificate RFW0710. The warranty certificate is incorporated by reference into this proposal, and included with this proposal or available upon request.
CAB PAINT INTERIOR
The visible interior cab structure surfaces shall be painted with a multi-tone onyx black texture finish.
CAB ENTRY DOORS
The cab shall include four (4) entry doors, two (2) front doors and two (2) crew doors designed for ease of entering and egress when outfitted with an SCBA. The doors shall be constructed of extruded aluminum with a nominal thickness of 0.13 inch. The exterior skins shall be constructed of 0.13 inch aluminum plate.
The doors shall include a double rolled style automotive rubber seal around the perimeter of each door frame and door edge which ensures a weather tight fit.
All door hinges shall be hidden within flush mounted cab doors for a pleasing smooth appearance and perfect fit along each side of the cab. Each door hinge shall be piano style with a 0.38 inch pin and shall be constructed of stainless steel.
CAB ENTRY DOOR TYPE
9.a
Packet Pg. 272 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) All cab entry doors shall be barrier clear design resulting in exposed lower cab steps. The doors shall provide approximately 32.00 inches of clearance from the ground to the bottom of the door so cab doors may be opened un-hindered by most obstacles encountered, such as guard rails along interstate highways.
Entry doors shall include Pollak mechanical plunger style switches for electrical component activation.
CAB INSULATION
The cab ceiling and walls shall include a nonwoven polyester fiber insulation. The insulation shall act as a barrier absorbing noise as well as assisting in sustaining the desired climate within the cab interior.
LH MID EMS COMPARTMENT
The cab shall include a compartment located in the middle of the wall above the left side wheel well.
The inner rear corner of the compartment shall be chamfered at a 45-degree angle to eliminate the square corner. The chamfered corner shall be cut at a width and depth of 7.00 inches the full height of the compartment. This compartment shall be offset and measure 17.00 inches just inside the door opening offset to 24.00 inches wide X 26.00 inches high X 25.00 inches deep, when viewing perpendicular to the side of the cab.
LH MID EMS EXTERIOR ACCESS
The cab shall include a hinged box pan door featuring a full length stainless steel piano style hinge and a DA sanded aluminum inner panel located in the middle of the wall above the left side wheel well. The compartment shall have a clear door opening of 15.00 inches wide X 24.00 inches high.
LH MID EMS COMPARTMENT INTERIOR
The cab compartment located in the middle of the wall above the left side wheel well shall include solid aluminum walls with no interior access. This compartment shall be finished to customer specification.
LH MID EMS COMPARTMENT DOOR HARDWARE
The left side EMS compartment door shall include a bent D-ring slam latch. There shall be a switch to activate the open compartment warning light in the cab in the event the door is left ajar.
RH MID EMS COMPARTMENT
The cab shall include a compartment located in the middle of the wall above the right side wheel well.
The inner rear corner of the compartment shall be chamfered at a 45-degree angle to eliminate the square corner. The chamfered corner shall be cut at a width and depth of 7.00 inches the full height of the compartment. This compartment shall be offset and measure 17.00 inches just inside the door opening offset to 24.00 inches wide X 26.00 inches high X 25.00 inches deep, when viewing perpendicular to the side of the cab.
RH MID EMS EXTERIOR ACCESS
The cab shall include a hinged box pan door featuring a full length stainless steel piano style hinge and a DA sanded aluminum inner panel located in the middle of the wall above the right side wheel well. The compartment shall have a clear door opening of 15.00 inches wide X 24.00 inches high.
RH MID EMS COMPARTMENT INTERIOR
The cab compartment located in the middle of the wall above the right side wheel well shall include solid aluminum walls with no interior access. This compartment shall be finished to customer specification.
9.a
Packet Pg. 273 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
RH MID EMS COMPARTMENT DOOR HARDWARE
The right side EMS compartment door shall include a bent D-ring slam latch. There shall be a switch to activate the open compartment warning light in the cab in the event the door is left ajar.
MID EMS COMPARTMENT LIGHTING
The interior portion of each of the mid EMS compartments shall include compartment door activated LED lighting to illuminate all usable surfaces within each compartment.
MID EMS COMPARTMENT EXTERIOR FINISH
The mid EMS compartment surfaces that are exposed to the interior of the cab shall be painted with a multi-tone onyx black texture finish.
MID EMS COMPARTMENT INTERIOR FINISH
The EMS compartment interior shall feature a DA sanded finish.
CAB STRUCTURAL WARRANTY
Purchaser shall receive a Cab Structure (Aluminum) Ten (10) Years or 100,000 Miles limited warranty in accordance with, and subject to, warranty certificate RFW0602. The warranty certificate is incorporated by reference into this proposal, and included with this proposal or available upon request.
CAB TEST INFORMATION
The cab shall have successfully completed the preload side impact, static roof load application and frontal impact without encroachment to the occupant survival space when tested in accordance with Section 4 of SAE J2420 COE Frontal Strength Evaluation Dynamic Loading Heavy Trucks, Section 5 of SAE J2422 Cab Roof Strength Evaluation Quasi Static Loading Heavy Trucks and ECE R29 Uniform Provisions Concerning the Approval of Vehicles with regard to the Protection of the Occupants of the Cab of a Commercial Vehicles Annex 3 Paragraph 5.
The above tests have been witnessed by and attested to by an independent third party. The test results were recorded using cameras, high speed imagers, accelerometers and strain gauges. Documentation of the testing shall be provided upon request.
ELECTRICAL SYSTEM
The chassis shall include a single starting electrical system which shall include a 12 volt direct current multiplexing system, suppressed per SAE J551. The wiring shall be appropriate gauge cross link with 311 degree Fahrenheit insulation. All SAE wires in the chassis shall be color coded and shall include the circuit number and function where possible. The wiring shall be protected by 275 degree Fahrenheit minimum high temperature flame retardant loom. All nodes and sealed Deutsch connectors shall be waterproof.
OEM WIRING
The wiring system shall include a prewire for ECM park brake input and engine ground return circuits located behind the switch panel. The circuits shall include an extra 2.00 feet of wire and shall be labeled "ECM Park Brake Input".
MULTIPLEX DISPLAY
The multiplex electrical system shall include an UltraView 780 display with an interactive touchscreen display and fourteen (14) tactile push buttons. The display shall be located on the left side of the dash in
9.a
Packet Pg. 274 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) the switch panel. The display shall feature a full color 7.00 inch LCD display screen which shall include a message bar displaying the time of day and important messages requiring acknowledgement by the user. The display screen shall be video ready for back-up cameras and applicable customer spec camera systems.
The display shall offer varying fonts and background colors. The display shall be fully programmable to the needs of the customer and shall offer virtually infinite flexibility for screen configuration options.
MULTIPLEX DISPLAY SPECIAL LAYOUT
The vehicle display and control screen shall be configured specifically for a virtual button on the control screen to override the park brake interlocked deactivation of the wiper system. This will reset when the park brake is cycled.
The vehicle display and control screen shall also be configured specifically for the display dimmer control screen to have two dimmer settings. The dimmer settings shall be labeled "DAY" (Normal) and "NIGHT". This shall omit the additional default settings "MAX" and "DIM".
LOAD MANAGEMENT SYSTEM
The apparatus load management shall be performed by the included multiplex system. The multiplex system shall also feature the priority of sequences and shall shed electrical loads based on the priority list specifically programmed.
DATA RECORDING SYSTEM
The chassis shall have a Weldon Vehicle Data Recorder (VDR) system installed. The system shall be designed to meet NFPA 1900 and shall be integrated with the Weldon Multiplex electrical system. The following information shall be recorded:
Vehicle Speed
Acceleration
Deceleration
Engine Speed
Engine Throttle Position
ABS Event
Seat Occupied Status
Seat Belt Status
Master Optical Warning Device Switch Position
Time
Date
Each portion of the data shall be recorded at the specified intervals and stored for the specified length of time to meet NFPA 1900 guidelines and shall be retrievable by connecting a laptop computer to the VDR system. The laptop connection shall be a panel mounted female type B USB connection point, remotely mounted in the left side foot well.
ACCESSORY POWER
The electrical distribution panel shall include two (2) power studs. The studs shall be size #10 and each of the power studs shall be circuit protected with a fuse of the specified amperage. One (1) power stud shall be capable of carrying up to a 40 amp battery direct load. One (1) power stud shall be capable of
9.a
Packet Pg. 275 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) carrying up to a 15 amp ignition switched load. The two (2) power studs shall share one (1) #10 ground stud.
An OEM body connections bracket shall be installed on the chassis near the left hand battery box. The bracket shall include one (1) set each of a 350 amp master power switched and 300 amp battery direct power and ground studs. The 300 amp & 350 amp studs will not have any fuse protection and will be the responsibility of anyone using these studs to have fuse protection for each load attached. The studs will be labeled with max available amperage.
AUXILIARY ACCESSORY POWER
An auxiliary six (6) position Blue Sea Systems 5025 blade type fuse panel shall be installed behind the switch panel. The fuse panel shall be circuit protected with a 40 amp fuse wired for a battery direct load.
ADDITIONAL ACCESSORY POWER
An additional six (6) position Blue Sea Systems 5025 blade type fuse panel shall be installed on the side wall of the engine tunnel behind the officer's seat. The fuse panel shall be circuit protected with a 40 amp fuse wired for a battery direct load.
EXTERIOR ELECTRICAL TERMINAL COATING
All terminals exposed to the elements will be sprayed with a high visibility protective rubberized coating to prevent corrosion.
ELECTRICAL SYSTEM WARRANTY
Purchaser shall receive an Electrical System Two (2) Years or 36,000 Miles limited warranty in accordance with, and subject to, warranty certificate RFW0202. The warranty certificate is incorporated by reference into this proposal, and included with this proposal or available upon request.
ENGINE
The chassis engine shall be a Cummins X15 engine. The X15 engine shall be an in-line six (6) cylinder, four-cycle diesel-powered engine. The engine shall offer a rating of 565 horsepower at 1800 RPM and shall be governed at 2100 RPM. The torque rating shall feature 1850-foot pounds of torque at 1000 RPM with 912 cubic inches (14.9 liter) of displacement.
The X15 engine shall feature a VGT Turbocharger, a high-pressure common rail fuel system, fully integrated electronic controls with an electronic governor, and shall be EPA certified to meet the 2021-26 emissions standards using cooled exhaust gas recirculation and selective catalytic reduction technology.
The engine shall include an engine mounted combination full flow/by-pass oil filter with replaceable spin on cartridge for use with the engine lubrication system. High quality lubricating oil that meets Cummins Engineering Standard CES 20086/CES20087 shall be used, see engine manual and vehicle data tag.
A wiring harness shall be supplied ending at the back of the cab. The harness shall include a connector which shall allow an optional harness for the pump panel. The included circuits shall be provided for a tachometer, oil pressure, engine temperature, hand throttle, high idle and a PSG system. A circuit for J1939 data link shall also be provided at the back of the cab.
9.a
Packet Pg. 276 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) If a pre-2027 emission engine is NOT available at the time of build (starting production on January 1, 2026) your order will automatically be upgraded and charged for either the 2027 engine compliant Cummins X-10 or X-15, with all associated costs being passed on to the end user.
No exceptions.
CAB ENGINE TUNNEL
The cab interior shall include an integrated engine tunnel constructed of 5052-H32 Marine Grade 0.19 of an inch thick aluminum alloy plate. The tunnel shall be a maximum of 46.50 inches wide X 29.00 inches high.
DIESEL PARTICULATE FILTER CONTROLS
There shall be two (2) controls for the diesel particulate filter. One (1) control shall be for regeneration and one (1) control shall be for regeneration inhibit.
ENGINE PROGRAMMING HIGH IDLE SPEED
The engine high idle control shall maintain the engine idle at approximately 1250 RPM when engaged.
ENGINE HIGH IDLE CONTROL
The vehicle shall be equipped with an automatic high-idle speed control which shall be pre-set to operate the engine at a specified RPM to increase alternator output if the system voltage drops to 12.5 volts. This device shall automatically operate only when the engine is running, the transmission is in neutral, and with the parking brake set. The automatic high idle will stay engaged for a minimum of ten (10) minutes and until the system, voltage has reached 13.0 volts. Application of the service brake will override the automatic high idle and reset timer. The vehicle shall be equipped with a high-idle speed virtual button on the vehicle display and control screen to activate/deactivate manual control only. It shall be pre-set so when activated, it will operate the engine at the specified RPM to increase alternator output. This device shall operate only when the engine is running, the transmission is in neutral, and with the parking brake set. When automatically engaged the high idle shall disengage when the operator depresses the brake pedal, or the transmission is placed in gear, and shall be available to manually or automatically re-engage when the brake pedal is released, or when the transmission is placed in neutral.
Virtual control screen shall not override automatic high idle between voltage parameters during timed cycle. Display shall indicate when high idle is disabled, enabled, or active.
ENGINE PROGRAMMING ROAD SPEED GOVERNOR
The engine shall include programming which will govern the top speed of the vehicle.
AUXILIARY ENGINE BRAKE
A compression brake, for the six (6) cylinder engine shall be provided. A cutout relay shall be installed to disable the compression brake when in pump mode or when an ABS event occurs. The engine compression brake shall activate upon 0% accelerator when in operation mode and actuate the vehicles brake lights.
The engine shall utilize a variable geometry turbo (VGT) as an integrated auxiliary engine brake to offer a variable rate of exhaust flow, which when activated in conjunction with the compression brake shall enhance the engine's compression braking capabilities.
AUXILIARY ENGINE BRAKE CONTROL
9.a
Packet Pg. 277 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) An engine compression brake control device shall be included. The electronic control device shall monitor various conditions and shall activate the engine brake only if all of the following conditions are simultaneously detected:
A valid gear ratio is detected.
The driver has requested or enabled engine compression brake operation. The throttle is at a minimum engine speed position.
The electronic controller is not presently attempting to execute an electronically controlled final drive gear shift.
There is no active ABS event.
The compression brake shall be controlled through an off/low/high rocker switch on the dash.
ELECTRONIC ENGINE OIL LEVEL INDICATOR
The engine oil shall be monitored electronically and shall send a signal to activate a warning in the instrument panel when levels fall below normal. The warning shall activate in a low oil situation upon turning on the master battery and ignition switches without the engine running.
FLUID FILLS
The front of the chassis shall accommodate fluid fill for the engine oil through the grille. This area shall also accommodate a check for the engine oil. The transmission, power steering, and coolant fluid fills and checks shall be under the cab. The windshield washer fill shall be accessible through the front left side mid step.
ENGINE DRAIN PLUG
The engine shall include an original equipment manufacturer installed oil drain plug.
ENGINE WARRANTY
The Cummins engine shall be warranted for a period of five (5) years or 100,000 miles, whichever occurs first.
REMOTE THROTTLE HARNESS
An apparatus interface wiring harness for the engine and transmission pump interlocks shall be supplied with the chassis. The harness shall include a connector for connection to a chassis pump panel harness supplied by the body builder and shall terminate in the left frame rail behind the cab for connection by the body builder. The harness shall include circuits deemed for a pump panel and shall contain circuits for a hand throttle, and a multiplexed gauge. Separate circuits shall also be included for a pump control switch, "Pump Engaged" and "OK to Pump" indicator lights, open compartment ground, start signal, park brake ground, ignition signal, master power, clean power, customer ignition, air horn solenoid switch, high idle switch and high idle indicator light. The harness shall contain interlocks that will prevent shifting to road or pump mode unless the transmission output speed translates to less than 1 mph and the transmission is in neutral. The shift to pump mode shall also require the park brake be set.
ENGINE PROGRAMMING REMOTE THROTTLE
The engine ECM (Electronic Control Module) discreet wire remote throttle circuit shall be turned off for use with a J1939 based pump controller or when the discreet wire remote throttle controls are not required.
ENGINE PROGRAMMING IDLE SPEED
The engine low idle speed will be programmed at 700 rpm.
9.a
Packet Pg. 278 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
ENGINE AIR INTAKE
The engine air intake system shall include an ember separator. This ember separator shall be designed to protect the downstream air filter from embers using a combination of unique flat and crimped metal screens packaged in a heavy duty galvanized steel frame. This multilayered screen shall trap embers and allow them to burn out before passing through the pack.
The engine air intake system shall also include an air cleaner mounted above the radiator. This air cleaner shall utilize a replaceable dry type filter element designed to prevent dust and debris from being ingested into the engine. A service cover shall be provided on the housing, reducing the chance of contaminating the air intake system during air filter service.
The air intake system shall include a restriction indicator light in the warning light cluster on the instrument panel, which shall activate when the air cleaner element requires replacement.
ENGINE FAN DRIVE
The engine cooling system fan shall incorporate a thermostatically controlled, Horton fully variable type fan drive with SmartClutch J-1939 CAN controller.
The variable speed fan clutch only engages at the amount needed for proper cooling to facilitate improved vehicle performance, cab heating in cold climates, and fuel economy. The fan clutch design shall be fail-safe so that if the clutch drive fails the fan shall engage to prevent engine overheating due to the fan clutch failure. The fan speed shall include a J-1939 CAN clutch controller to receive signal from the engine control module to activate at variable rates of speed. Variable speeds shall be set through thermostatic and engine speed signals to run as efficiently and quietly as required to maintain temperature.
ENGINE COOLING SYSTEM
There shall be a heavy-duty aluminum cooling system designed to meet the demands of the emergency response industry. The cooling system shall have the capacity to keep the engine properly cooled under all conditions of road and pumping operations. The cooling system shall be designed and tested to meet or exceed the requirements specified by the engine and transmission manufacturer and all EPA requirements. The complete cooling system shall be mounted to isolate the entire system from vibration or stress. The individual cores of the cooling system shall be mounted in a manner to allow expansion and contraction at various rates without inducing stress into the adjoining cores.
The cooling system shall be comprised of a charge air cooler to radiator serial flow package that provides the maximum cooling capacity for the specified engine as well as serviceability. The main components shall include a surge tank, a charge air cooler bolted to the front of the radiator, recirculation shields, a shroud, a fan, and required tubing.
The radiator shall be a down-flow design constructed with aluminum cores, plastic end tanks, and a steel frame. The radiator shall be equipped with a drain cock to drain the coolant for serviceability.
The cooling system shall include a one piece injected molded polymer fan with a three (3) piece fiberglass fan shroud.
The cooling system shall be equipped with a surge tank that is capable of removing entrained air from the system. The surge tank shall be equipped with a low coolant probe and rearward oriented sight glass
9.a
Packet Pg. 279 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) to observe coolant in the system. A cold fill and observation line shall be included within the frame mounted translucent recovery bottle to monitor the level of the coolant. The surge tank shall have a dual seal cap that meets the engine manufacturer's pressure requirements and allows for expansion and recovery of coolant into a separate integral expansion chamber.
All radiator tubes shall be formed from aluminized steel tubing. Recirculation shields shall be installed where required to prevent heated air from reentering the cooling package and affecting performance.
The charge air cooler shall be a cross-flow design constructed completely of aluminum with cast tanks.
All charge air cooler tubes shall be formed from aluminized steel tubing and installed with silicone hump hoses and stainless steel "constant torque" style clamps meeting the engine manufacturer's requirements.
The radiator and charge air cooler shall be removable through the bottom of the chassis.
ENGINE COOLING SYSTEM PROTECTION
The engine cooling system shall include a recirculation shield designed to act as a light duty skid plate below the radiator to provide additional protection for the engine cooling system from light impacts, stones, and road debris. The skid plate shall be painted to match the frame components.
ENGINE COOLANT
The cooling package shall include Extended Life Coolant (ELC). The use of ELC provides longer intervals between coolant changes over standard coolants providing improved performance. The coolant shall contain a 50/50 mix of ethylene glycol and de-ionized water to keep the coolant from freezing to a temperature of -34 degrees Fahrenheit.
Proposals offering supplemental coolant additives (SCA) shall not be considered, as this is part of the extended life coolant makeup.
ENGINE COOLANT FILTER
An engine coolant filter with a shut-off valve for the inlet and outlet shall be installed on the chassis.
The location of the filter shall allow for easy maintenance.
Proposals offering engines equipped with coolant filters shall be supplied with standard non-chemical type particulate filters.
ELECTRONIC COOLANT LEVEL INDICATOR
The instrument panel shall feature a low engine coolant indicator light which shall be located in the center of the instrument panel. An audible tone alarm shall also be provided to warn of a low coolant incident.
COOLANT HOSES
The cooling systems hose shall be formed silicone hose and formed aluminized steel tubing and include stainless steel constant torque band clamps.
ENGINE COOLANT OVERFLOW BOTTLE
A remote engine coolant overflow expansion bottle shall be provided in the case of over filling the coolant system. The overflow bottle shall capture the expansion fluid or overfill rather than allow the fluid to drain on the ground.
9.a
Packet Pg. 280 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
ENGINE PUMP HEAT EXCHANGER
A single bundle type coolant to water heat exchanger shall be installed between the engine and the radiator. The heat exchanger shall be designed to prohibit water from the pump from coming in contact with the engine coolant. This shall allow the use of water from the discharge side of the pump to assist in cooling the engine.
ENGINE EXHAUST SYSTEM
The exhaust system shall include an end-in end-out horizontally mounted single module after treatment device, and downpipe from the charge air cooled turbo. The single module shall include four temperature sensors, diesel particulate filter (DPF), urea dosing module (UL2), and a selective catalytic reduction (SCR) catalyst to meet current EPA standards. The selective catalytic reduction catalyst utilizes a diesel exhaust fluid solution consisting of urea and purified water to convert NOx into nitrogen, water, and trace amounts of carbon dioxide. The solution shall be mixed and injected into the system through the DPF and SCR.
The system shall utilize 0.07 inch thick stainless steel exhaust tubing between the engine turbo and the DPF. Zero leak clamps seal all system joints between the turbo and DPF.
The single module after treatment through the end of the tailpipe shall be connected with zero leak clamps. The discharge shall terminate horizontally on the right side of the vehicle ahead of the rear tires.
The exhaust system after treatment module shall be mounted below the frame in the inboard position.
The mounting brackets shall be mounted on the inside of the frame.
DIESEL EXHAUST FLUID TANK
The exhaust system shall include a molded cross linked polyethylene tank for Diesel Exhaust Fluid (DEF). The tank shall have a capacity of six (6) usable gallons and shall be mounted on the left hand side of the chassis frame behind the batteries below the frame.
The DEF tank shall be designed with capacity for expansion in case of fluid freezing. Engine coolant, which shall be thermostatically controlled, shall be run through lines in the tank to help prevent the DEF from freezing and to provide a means of thawing the fluid if it should become frozen.
The tank fill tube shall be routed under the rear of the cab with the fill neck and splash guard accessible in the top rear step.
ENGINE EXHAUST ACCESSORIES
An exhaust temperature mitigation device shall be shipped loose for installation by the body manufacturer on the vehicle. The temperature mitigation device shall lower the temperature of the exhaust by combining ambient air with the exhaust gasses at the exhaust outlet.
ENGINE EXHAUST WRAP
The exhaust tubing between the engine turbo and the diesel particulate filter (DPF) shall be wrapped with a thermal cover in order to retain the necessary heat for DPF regeneration. The exhaust wrap shall also help protect surrounding components from radiant heat which can be transferred from the exhaust.
The exhaust flex joint shall not include the thermal exhaust wrap.
EMISSIONS SYSTEMS WARRANTY
9.a
Packet Pg. 281 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Purchaser shall receive a Regulated Emissions Systems Five (5) Years or 100,000 Miles limited warranty in accordance with, and subject to, warranty certificate RFW0140. The warranty certificate is incorporated by reference into this proposal, and included with this proposal or available upon request.
TRANSMISSION
The drive train shall include an Allison model EVS 4000 torque converting, automatic transmission which shall include electronic controls. The transmission shall feature two (2) 10-bolt PTO pads located on the converter housing.
The transmission shall include two (2) internal oil filters which shall offer Allison formulated Castrol TranSynd synthetic transmission fluid which shall be utilized in the lubrication of the EVS transmission. An electronic oil level sensor shall be included with the readout located in the shift selector.
The transmission gear ratios shall be:
1st 3.51:1
2nd 1.91:1
3rd 1.43:1
4th 1.00:1
5th 0.74:1
6th 0.64:1 (if applicable)
Rev 4.80:1
TRANSMISSION MODE PROGRAMMING
The transmission, upon start-up, will select the fifth speed operation without the need to press the mode button.
TRANSMISSION FEATURE PROGRAMMING
The Allison Gen V/VI-E transmission EVS group package number 127 shall contain the 198 vocational package in consideration of the duty of this apparatus as a pumper. This package shall incorporate an automatic neutral with selector override. This feature commands the transmission to neutral when the park brake is applied, regardless of drive range requested on the shift selector. This requires re-selecting drive range to shift out of neutral for the override.
This package shall be coupled with the use of a split shaft PTO and incorporate pumping circuits.
These circuits shall be used allowing the vehicle to operate in the fourth range lockup while operating the pump mode due to the 1 to 1 ratio through the transmission, therefore the output speed of the engine is the input speed to the pump. The pump output can be easily calculated by using this input speed and the drive ratio of the pump itself to rate the gallons of water the pump can provide.
A transmission interface connector shall be provided in the cab. This package shall contain the following input/output circuits to the transmission control module. The Gen V/VI-E transmission shall include prognostic diagnostic capabilities. These capabilities shall include the monitoring of the fluid life, filter change indication, and transmission clutch maintenance.
Function ID Description Wire assignment
Inputs
C PTO Request 142
9.a
Packet Pg. 282 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) J Fire Truck Pump Mode (4th Lockup) 122 / 123
Outputs
C Range Indicator 145 (4th)
G PTO Enable Output 130
Signal Return 103
TRANSMISSION SHIFT SELECTOR
An Allison pressure sensitive range selector touch pad shall be provided and located to the right of the driver within clear view and easy reach. The shift selector shall have a graphical Vacuum Florescent Display (VFD) capable of displaying two lines of text. The shift selector shall provide mode indication and a prognostic indicator (wrench symbol) on the digital display. The prognostics monitor various operating parameters and shall alert you when a specific maintenance function is required.
ELECTRONIC TRANSMISSION OIL LEVEL INDICATOR
The transmission fluid shall be monitored electronically.
TRANSMISSION PRE-SELECT WITH AUXILIARY BRAKE
When the auxiliary brake is engaged, the transmission shall automatically shift to second gear to decrease the rate of speed assisting the secondary braking system and slowing the vehicle.
TRANSMISSION COOLING SYSTEM
The transmission shall include a water to oil cooler system located in the cooling loop between the radiator and the engine. The transmission cooling system shall meet all transmission manufacturer requirements. The transmission cooling system shall feature continuous flow of engine bypass water to maintain uninterrupted transmission cooling.
TRANSMISSION DRAIN PLUG
The transmission shall include an original equipment manufacturer installed magnetic transmission fluid drain plug.
TRANSMISSION WARRANTY
The Allison EVS series transmission shall be warranted for a period of five (5) years with unlimited mileage. Parts and labor shall be included in the warranty.
LH PTO
A ten (10) bolt standard duty clutched drive PTO shall be provided by the chassis manufacturer and installed on the transmission. Installation shall include mounting of the PTO and wiring the unit with a control switch.
LH PTO MODEL
A ten (10) bolt Chelsea model 281-GGFJP-E5XD heavy duty transmission driven PTO shall be installed. The clutched shifted PTO is designed specifically for the Allison world transmission and provides an intermittent and continuous torque rating of 360 lb. ft.
PTO LOCATION
The transmission shall have two (2) power take off (PTO) mounting locations, one (1) in the 8:00 oclock position and one (1) in the 1:00 oclock position.
LH PTO CONTROL
9.a
Packet Pg. 283 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Switches for the power take off shall be wired to the V-mux node to be used by the OEM. There shall be an on/off rocker switch labeled "Aerial Master" wired to a V-mux input and output with integral light wired to the v-mux input terminal of the switch that shall illuminate when the switch is on, and the v-mux output is active.
There shall be an on/off rocker switch labeled "Aerial PTO" activated by the "Aerial Master" rocker switch with an input to the V-mux node when the switch is on and an integral light activated by an independent V-mux output. The switches shall be located on dash.
DRIVELINE
All drivelines shall be heavy duty metal tube and equipped with MSI 1810 series universal joints for the main drivelines, and 1710 series for the inter-axle shaft. The shafts shall be dynamically balanced prior to installation to alleviate future vibration. In areas of the driveline where a slip shaft is required, the splined slip joint shall be coated with Glide Coat®. The drivelines shall include Meritor brand u-joints with thrust washers.
MIDSHIP PUMP / GEARBOX
A temporary jackshaft driveline shall be installed by the chassis manufacturer to accommodate the mid-ship split shaft pump as specified by the apparatus manufacturer. Holes shall be provided in the frame as specified by the OEM for mounting a Smeal aerial pump module.
See PDF for specific hole pattern.
MIDSHIP PUMP / GEARBOX MODEL
The midship pump/gearbox provisions shall be for a Waterous CSUC20 or C22 pump.
MIDSHIP PUMP GEARBOX DROP
The Waterous pump gearbox shall have a "B" (short) drop length.
MIDSHIP PUMP RATIO
The ratio for the midship pump shall be 2.46:1.
MIDSHIP PUMP LOCATION C/L SUCTION TO C/L REAR AXLE
The midship pump shall be located so the dimension from the centerline of the suction to the centerline of the rear axle is 113.00 inches.
PUMP SHIFT CONTROLS
One (1) air pump shift control panel shall be located on the left hand side of the engine tunnel, integrated with the shifter pod. The following shall be provided on the panel: a three (3) position control lever; an engraved PUMP ENGAGED identification light; and an engraved OK TO PUMP identification light. The pump shift control panel shall be black with a yellow border outline and shall include pump instructions. An instruction plate describing the transmission shift selector position used for pumping shall be provided and located so it can be read from the drivers position per NFPA
16.10.1.3. The road mode shall be selected when the control lever is in the forward position and pump mode shall be selected when the control lever is in the rearward position.
The control lever center position shall exhaust air from both pump and road sides of the pump gear box shift cylinder.
PUMP SHIFT CONTROL PLUMBING
9.a
Packet Pg. 284 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Air connections shall be provided from the air supply tank to the pump shift control valve and from the pump shift control valve to the frame mounted bracket. The frame mounted bracket shall include labeling identifying the pump and road connection points with threaded 0.25 inch NPT fittings on the solenoid for attaching the customer installed pump. The air supply shall be pressure protected from service brake system.
FUEL FILTER/WATER SEPARATOR
The fuel system shall have a Racor GreenMAX 6600R fuel filter/water separator as a primary filter. The fuel filter shall have a drain valve and a see-through cover to allow visual inspection of fuel and filter condition. The Racor 6600R shall meet engine requirements for particulate size, collection capacity, removal efficiency, and water removal efficiency. The filter shall be capable of handling a maximum flow rate of 150 gallons per hour.
A secondary fuel filter shall be included as approved by the engine manufacturer.
An instrument panel lamp and audible alarm which indicates when water is present in the fuel-water separator shall also be included.
FUEL LINES
The fuel system supply and return lines installed from the fuel tank to the engine shall be black textile braided lines which are reinforced with braided high tensile steel wire. The fuel lines shall be connected with reusable steel fittings.
FUEL SHUTOFF VALVE
There shall be two (2) fuel shutoff valves which shall be installed, one (1) in the fuel draw line at the primary fuel filter and one (1) in the fuel outlet line at the primary fuel filter to allow the fuel filters to be changed without loss of fuel to the fuel pump.
A third fuel shutoff valve shall be installed in the fuel draw line, near the fuel tank to allow maintenance to be performed with minimal loss of fuel.
ELECTRIC FUEL PRIMER
Integral to the engine assembly is an electric lift pump that serves the purpose of pre-filter fuel priming.
FUEL COOLER
A fuel cooler shall be provided to lower fuel temperature allowing the vehicle to operate at higher ambient temperatures. The fuel cooler shall include an electrical fan and temperature-controlled relay switch.
FUEL TANK
The fuel tank shall have a capacity of sixty-eight (68) gallons and shall measure 35.00 inches in width X
17.00 inches in height X 29.00 inches in length.
The baffled tank shall have a vent port to facilitate venting to the top of the fill neck for rapid filling without "blow-back" and a roll over ball check vent for temperature related fuel expansion and draw.
The tank is designed with dual draw tubes and sender flanges. The tank shall have 2.00 inch NPT fill ports for right or left hand fill. A 0.50 inch NPT drain plug shall be centered in the bottom of the tank.
9.a
Packet Pg. 285 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The fuel tank shall be mounted below the frame, behind the rear axle. Two (2) three-piece strap hanger assemblies with "U" straps bolted midway on the fuel tank front and rear shall be utilized to allow the tank to be easily lowered and removed for service purposes. Rubber isolating pads shall be provided between the tank and the upper tank mounting brackets. Strap mounting studs through the rail, hidden behind the body shall not be acceptable.
FUEL TANK MATERIAL AND FINISH
The fuel tank shall be constructed of 12 gauge aluminized steel. The exterior of the tank shall be powder coated black and then painted to match the frame components.
All powder coatings, primers and paint shall be compatible with all metals, pretreatments and primers used. The cross hatch adhesion test per ASTM D3359 Method B, results to be 5B minimum. The pencil hardness test per ASTM D3363 shall have a final post-curved pencil hardness of H-2H. The direct impact resistance test per ASTM D2794, results to be 5B minimum.
Any proposals offering painted fuel tanks with variations from the above process shall not be accepted.
The film thickness of vendor supplied parts shall also be sufficient to meet the performance standards as stated above.
FUEL TANK STRAP MATERIAL
The fuel tank straps shall be constructed of ASTM A-36 steel. The fuel tank straps shall be powder coated black and then painted to match the frame components if possible.
FUEL TANK MISCELLANEOUS OPTIONS
The fuel tank shall be temporarily mounted, to be permanently relocated by the OEM. The tank and mounting straps as specified shall be included with the chassis along with components for permanent standard installation.
FUEL TANK FILL PORT
The fuel tank fill ports shall be provided with two (2) left fill ports located one (1) in the forward position and one (1) in the middle position and the right fill port located in the middle position of the fuel tank.
FUEL TANK SERVICEABILTY PROVISIONS
The chassis fuel lines and sender wiring shall have additional length provided so the tank can be easily lowered and removed for service purposes. The additional 12.00 feet of length shall be located above the fuel tank and shall be coiled and secured. The fuel line fittings shall be pointed towards the right side (curbside) of the chassis.
FUEL TANK DRAIN PLUG
A 0.5 inch NPT magnetic drain plug shall be centered in the bottom of the fuel tank.
FRONT AXLE
The front axle shall be a Hendrickson STEERTEK Non-drive front axle, NXT Fire/Rescue model. The axle shall include 3.74 inches of drop and a 70.87 inches wide king pin intersection (KPI). The axle shall be a box-shaped fabricated beam with integrated suspension. The axle shall include a conventional style hub with a standard knuckle. The weight capacity for the axle shall be rated up to 24,000 pounds.
FRONT WHEEL BEARING LUBRICATION
9.a
Packet Pg. 286 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The front axle wheel bearings shall be lubricated with oil. The oil level can be visually checked via clear inspection windows in the front axle hubs.
FRONT SHOCK ABSORBERS
Shock absorbers shall be supplied by the suspension manufacturer and installed on the front axle suspension.
FRONT SUSPENSION
The front suspension shall include a parabolic leaf spring pack integrated into the Hendrickson STEERTEK NXT axle consisting of 58.40 inches long and 4.00 inches wide tapered leaf springs and shall feature a military double wrapped front eye. Spring eyes shall have Hendricksons proprietary threaded pin bushings to increase roll stiffness. The spring capacity shall be rated specifically to the axle configuration from 18,000 and up to 24,000 pounds.
STEERING COLUMN/ WHEEL
The cab shall include a Douglas Autotech steering column which shall include a seven (7) position tilt, a
2.25 inch telescopic adjustment, and an 18.00 inch, four (4) spoke steering wheel located at the drivers position. The steering wheel shall be covered with black polyurethane foam padding.
The steering column shall contain a horn button, self-canceling turn signal switch, four-way hazard switch and headlamp dimmer switch.
ELECTRONIC POWER STEERING FLUID LEVEL INDICATOR
The power steering fluid shall be monitored electronically and shall send a signal to activate an audible alarm and visual warning in the instrument panel when fluid level falls below normal.
POWER STEERING PUMP
The hydraulic power steering pump shall be a Vickers V20H and shall be gear driven from the engine.
The pump shall be a fixed displacement vane type. The power steering system shall include an oil to air passive cooler.
FRONT AXLE CRAMP ANGLE
The chassis shall have a front axle cramp angle of 45-degrees to the left and 43-degrees to the right.
Note: Addition of optional equipment may require cramp angle to be reduced.
POWER STEERING GEAR
The power steering gear shall be a TRW model TAS 85 with an assist cylinder.
CHASSIS ALIGNMENT
The chassis frame rails shall be measured to insure the length is correct and cross checked to make sure they run parallel and are square to each other. The front and rear axles shall be laser aligned. The front tires and wheels shall be aligned and toe-in set on the front tires by the chassis manufacturer.
REAR AXLE
The rear axle shall be a Meritor model RT-52-185 tandem drive axle. The axle shall include precision forged, single reduction differential gearing, and shall have a fire service rated capacity of 54,000 pounds.
9.a
Packet Pg. 287 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The axle shall be built of superior construction and quality components to provide the rugged dependability needed to stand up to the fire industrys demands. The axle shall include rectangular shaped, hot-formed housing with a standard wall thickness of 0.56 of an inch for extra strength and rigidity and a rigid differential case for high axle strength and reduced maintenance.
The axle shall have heavy-duty Hypoid gearing for longer life, greater strength and quieter operation.
Industry-standard wheel ends for compatibility with both disc and drum brakes, and unitized oil seal technology to keep lubricant in and help prevent contaminant damage will be used.
REAR AXLE DIFFERENTIAL LUBRICATION
The rear axle differential shall be lubricated with oil.
REAR AXLE WARRANTY
The rear axle shall be warranted by Meritor for five (5) years with unlimited miles under the general service application. Details of the Meritor warranty are provided on the PDF document attached to this option.
REAR WHEEL BEARING LUBRICATION
The rear axle wheel bearings shall be lubricated with oil.
REAR AXLE DIFFERENTIAL CONTROL
The tandem axle chassis shall include an inter-axle differential lock, which shall allow both axles to be engaged as drive axles. The inter-axle differential lock shall be controlled by a lighted locking rocker switch on the switch panel.
VEHICLE TOP SPEED
The top speed of the vehicle shall be approximately 65 MPH +/-2 MPH at governed engine RPM.
REAR SUSPENSION
The tandem rear axle shall feature a Hendrickson Firemaax air suspension. Each axle will be independently suspended for optimum performance. The suspension shall include four optimized air springs mounted to cast structural trailing arms, transverse cross beams for increased roll stability and four heavy duty shock absorbers. Dual air height control valves shall be installed on each axle to ensure equal frame height on both sides of the vehicle regardless of the load. Axle alignment is maintained using four eccentric bushings at each frame bracket. The rear tandem suspension shall have 54.00 inch axle centers.
The rear suspension capacity shall be rated at 48,001 to 54,000 pounds
REAR SHOCK ABSORBERS
Shock absorbers shall be supplied by the suspension manufacturer and installed on the rear axle suspension.
TIRE INTERMITTENT SERVICE RATING
The chassis shall be rated using Intermittent Service ratings provided to the emergency vehicle market by the tire manufacturers as the basis for determining the maximum vehicle load and speed.
FRONT TIRE
9.a
Packet Pg. 288 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The front tires shall be Michelin 425/65R-22.5 20PR "L" tubeless radial XZY3 mixed service tread.
The front tire stamped load capacity shall be 22,800 pounds per axle with a nominal speed rating of 65 miles per hour when properly inflated to 120 pounds per square inch.
The Michelin Intermittent Service Rating maximum load capacity shall be 24,396 pounds per axle with a maximum speed of 65 miles per hour when properly inflated to 120 pounds per square inch.
The Michelin Intermittent Service Rating maximum speed capacity shall be 22,800 pounds per axle with a speed rating of 75 miles per hour when properly inflated to 120 pounds per square inch.
The Michelin Intermittent Service Rating limits the operation of the emergency vehicle to no more than fifty (50) miles of continuous operation under maximum recommended payload, or without stopping for at least twenty (20) minutes. The emergency vehicle must reduce its speed to no more than 50 MPH after the first fifty (50) miles of travel.
REAR TIRE
The rear tires shall be Michelin 315/80R-22.5 20PR "L" tubeless radial X Works XDY mixed service tread.
The rear tire stamped load capacity shall be 33,080 pounds per axle with a nominal speed rating of 65 miles per hour when properly inflated to 130 pounds per square inch.
The Michelin Intermittent Service Rating maximum load capacity shall be 35,396 pounds per axle with a maximum speed of 65 miles per hour when properly inflated to 130 pounds per square inch.
The Michelin Intermittent Service Rating maximum speed capacity shall be 33,080 pounds per axle with a speed rating of 75 miles per hour when properly inflated to 130 pounds per square inch.
The Michelin Intermittent Service Rating limits the operation of the emergency vehicle to no more than fifty (50) miles of continuous operation under maximum recommended payload, or without stopping for at least twenty (20) minutes. The emergency vehicle must reduce its speed to no more than 50 MPH after the first fifty (50) miles of travel.
REAR AXLE RATIO
The rear axle ratio shall be 5.38:1.
TIRE PRESSURE INDICATOR
There shall be electronic chrome LED valve caps shipped loose for installation by the OEM which shall illuminate with a red LED when tire pressure drops 8psi provided. The valve caps are self-calibrating and set to the pressure of the tire upon installation.
FRONT WHEEL
The front wheels shall be Alcoa hub piloted, 22.50 inch X 12.25 inch aluminum wheels. The outer face of the wheels shall feature Alcoas Dura-Bright® finish as an integral part of the wheel surface. Alcoa Dura-Bright® wheels keep their shine without polishing. Brake dust, grime and road debris are easily removed by simply cleaning the wheels with soap and water. The hub piloted mounting system shall provide easy installation and shall include two-piece flange nuts.
9.a
Packet Pg. 289 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
REAR WHEEL
The rear wheels shall be Alcoa hub piloted, 22.50 inch X 9.00 inch aluminum wheels with a polished outer surface and Alcoa Dura-Bright® wheel treatment as an integral part of the wheel surface. The inner rear wheels shall be Alcoa hub piloted, 22.50 inch X 9.00 inch aluminum wheels with a polished inner and outer surface and Alcoa Dura-Bright® wheel treatment as an integral part of the wheel surface. The hub piloted mounting system shall provide easy installation and shall include two-piece flange nuts.
BALANCE WHEELS AND TIRES
All of the wheels and tires, including any spare wheels and tire assemblies, shall be dynamically balanced.
WHEEL TRIM
The front wheels shall include stainless steel lug nut covers and stainless steel baby moons shipped loose with the chassis for installation by the apparatus builder. The baby moons shall have cutouts for oil seal viewing when applicable.
The rear wheels shall include stainless steel lug nut covers and band mounted spring clip stainless steel high hats shipped loose with the chassis for installation by the apparatus builder.
The lug nut covers, baby moons, and high hats shall be RealWheels® brand constructed of 304L grade, non-corrosive stainless steel with a mirror finish. Each wheel trim component shall meet D.O.T. certification.
BRAKE SYSTEM
A rapid build-up air brake system shall be provided. The air brakes shall include, at a minimum, a three (3) air tank, four (4) reservoir system with a total of 6236 cubic inch of air capacity. A floor mounted treadle valve shall be mounted inside the cab for graduated control of applying and releasing the brakes.
An inversion valve shall be installed to provide a service brake application in the unlikely event of primary air supply loss. All air reservoirs provided on the chassis shall be labeled for identification.
The tandem rear axle spring brakes shall automatically apply in any situation when the air pressure falls below 25 PSI and shall include a mechanical means for releasing the spring brakes when necessary. An audible alarm shall designate when the system air pressure is below 60 PSI.
A six (6) sensor, six (6) modulator Anti-lock Braking System (ABS) shall be installed on the front and tandem rear axles in order to prevent the brakes from locking or skidding while braking during hard stops or on icy or wet surfaces. This in turn shall allow the driver to maintain steering control under heavy braking and in most instances, shorten the braking distance. The electronic monitoring system shall incorporate diagonal circuitry which shall monitor wheel speed during braking through a sensor and tone ring on each wheel. A dash mounted ABS lamp shall be provided to notify the driver of a system malfunction. The ABS system shall automatically disengage the auxiliary braking system device when required. The speedometer screen shall be capable of reporting all active defaults using PID/SID and FMI standards.
Additional safety shall be accommodated through Automatic Traction Control (ATC) which shall be installed on the tandem rear axle. The ATC system shall apply the ABS when the drive wheels lose
9.a
Packet Pg. 290 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) traction. The system shall scale the electronic engine throttle back to prevent wheel spin while accelerating on ice or wet surfaces.
A virtual button on the vehicle display and control screen shall be provided and properly labeled "mud/snow". When the switch is pressed once, the system shall allow a momentary wheel slip to obtain traction under extreme mud and snow conditions. During this condition the ATC light shall blink continuously notifying the driver of activation. Pressing the switch again shall deactivate the mud/snow feature.
The Electronic Stability Control (ESC) unit is a functional extension of the electronic braking system. It is able to detect any skidding of the vehicle about its vertical axis as well as any rollover tendency. The control unit comprises an angular-speed sensor that measures the vehicles motion about the vertical axis, caused, for instance, by cornering or by skidding on a slippery road surface. An acceleration sensor measures the vehicles lateral acceleration. The Controller Area Network (CAN) bus provides information on the steering angle. On the basis of lateral acceleration and steering angle, an integrated microcontroller calculates a theoretical angular speed for the stable vehicle condition. FRONT BRAKES The front brakes shall be Meritor EX225 Disc Plus disc brakes with 17.00 inch vented rotors.
REAR BRAKES
The rear brakes shall be Meritor 16.50 inch X 7.00 inch S-cam drum type. The brakes shall feature a cast iron shoe.
PARK BRAKE
Upon application of the push-pull valve in the cab, the rear brakes will engage via mechanical spring force. This is accomplished by dual chamber rear brakes, satisfying the FMVSS parking brake requirements.
SUPPLEMENTAL BRAKE
A supplemental brake engagement shall be supplied that can only be engaged while the rear spring brakes are engaged. In addition to the mechanical rear brake engagement, the front service brakes shall also be engaged via air pressure, providing additional braking capability. Front service brake activation shall be accomplished with activation of the rear mechanical park brake valve.
PARK BRAKE CONTROL
A Meritor-Wabco manual hand control push-pull style valve shall operate the parking brake.
The parking brake actuation valve shall be mounted to the left side of the engine tunnel integrated into the transmission shift pod console within easy access of the driver.
REAR BRAKE SLACK ADJUSTERS
Haldex rear brake automatic slack adjusters shall be installed on the axle.
AIR DRYER
The brake system shall include a Wabco System Saver 1200 air dryer with an integral heater with a Metri-Pack sealed connector. The air dryer incorporates an internal turbo cutoff valve that closes the path between the air compressor and air dryer purge valve during the compressor "unload" cycle. The turbo cutoff valve allows purging of moisture and contaminants without the loss of turbo boost pressure.
9.a
Packet Pg. 291 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The air dryer shall be mounted behind the battery box on the left hand side.
FRONT BRAKE CHAMBERS
The front brakes shall be provided with type 24 brake chambers as supplied with the Hendrickson STEERTEK NXT axle.
REAR BRAKE CHAMBERS
The rear axle shall include TSE 30/36 brake chambers which shall convert the energy of compressed air into mechanical force and motion. This shall actuate the brake camshaft, which in turn shall operate the foundational brake mechanism forcing the brake shoes against the brake drum. The TSE Type 36 brake chamber has a 36.00 square inch effective area.
AIR COMPRESSOR
The air compressor provided for the engine shall be a Wabco® SS318 single cylinder pass-through drive type compressor which shall be capable of producing 18.7 CFM at 1200 engine RPMs. The air compressor shall feature a higher delivery efficiency translating to more air delivery per horsepower absorbed. The compressor shall include an aluminum cylinder head which shall improve cooling, reduce weight and decrease carbon formation. Superior piston and bore finishing technology shall reduce oil consumption and significantly increasing the system component life.
AIR GOVERNOR
An air governor shall be provided to control the cut-in and cut-out pressures of the engine mounted air compressor. The governor shall be calibrated to meet FMVSS requirements. The air governor shall be located on the air dryer bracket.
MOISTURE EJECTORS
Automatic moisture ejectors with a manual drain provision shall be installed on all reservoirs of the air supply system. The manual drain provision shall include an actuation pull cable coiled and tied at each drain valve. The supplied cables when extended shall be sufficient in length to allow each drain to be activated from the side of the apparatus.
AIR SUPPLY LINES
The air system on the chassis shall be plumbed with color coded reinforced nylon tubing air lines. The primary (rear) brake line shall be green, the secondary (front) brake line red, the parking brake line orange or yellow, and the auxiliary (outlet) will be blue.
Brass compression type fittings shall be used on the nylon tubing except as noted. All drop hoses shall include fiber reinforced neoprene covered hoses.
Note: The IR-2 valve shall include push to connect fittings.
AIR INLET CONNECTION
An air connection for the shoreline air inlet shall be supplied.
AIR INLET LOCATION
The air inlet shall be installed in the left hand side lower front step in the forward position.
AIR INLET/ OUTLET FITTING TYPE
The air connector supplied shall be a 0.25 inch size Tru-Flate Interchange style manual connection
9.a
Packet Pg. 292 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) which is compatible with Milton T style, Myers 0.25 inch Automotive style and Parker 0.25 inch 10 Series connectors.
REAR AIR TANK MOUNTING
If a combination of wheel base, air tank quantity, or other requirements necessitate the location of one or more air tanks to be mounted rear of the fuel tank, these tank(s) will be mounted perpendicular to frame.
WHEELBASE
The chassis wheelbase shall be 233.00 inches.
REAR OVERHANG
The chassis rear overhang shall be 64.00 inches.
FRAME
The frame shall consist of double rails running parallel to each other with cross members forming a ladder style frame. The frame rails shall be formed in the shape of a "C" channel, with the outer rail measuring 10.25 inches high X 3.50 inches deep upper and lower flanges X 0.38 inches thick with an inner channel of 9.44 inches high X 3.13 inches deep and 0.38 inches thick. Each rail shall be constructed of 110,000 psi minimum yield high strength low alloy steel. Each double rail section shall be rated by a Resistance Bending Moment (RBM) minimum of 3,213,100 inch pounds and have a minimum section modulus of 29.21 cubic inches. The frame shall measure 35.00 inches in width.
Proposals calculating the frame strength using the "box method" shall not be considered.
Proposals including heat treated rails shall not be considered. Heat treating frame rails produces rails that are not uniform in their mechanical properties throughout the length of the rail. Rails made of high strength, low alloy steel are already at the required yield strength prior to forming the rail.
A minimum of seven (7) fully gusseted 0.25 inch thick cross members shall be installed. The inclusion of the body mounting, or bumper mounting shall not be considered as a cross member. The cross members shall be attached using zinc coated grade 8 fasteners. The bolt heads shall be flanged type, held in place by distorted thread flanged lock nuts. Each cross member shall be mounted to the frame rails utilizing a minimum of 0.25 inch thick gusset reinforcement plates at all corners balancing the area of force throughout the entire frame.
.Any proposals not including additional reinforcement for each cross member shall not be considered.
All relief areas shall be cut in with a minimum 2.00 inch radius at intersection points with the edges ground to a smooth finish to prevent a stress concentration point.
MISCELLANEOUS FRAME OPTIONS
The frame shall include drillings which shall be specific to mounting a Smeal 105RM, 100RM, 125RM, or 100MM substructure.
See PDF for OEM Specified pattern.
FRAME CLEAR AREA
The chassis frame shall be left clear of chassis mounted components inside or outside the frame rails
9.a
Packet Pg. 293 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) within the first 30.00 inches behind the cab to allow space for OEM installed components. Cross members may be installed in the clear area if required for proper frame or driveline configuration.
FRAME PAINT
The frame rails shall be hot dip galvanized prior to assembly and attachment of any components. The components that shall be galvanized shall include:
Main frame "C" channel or channels
The frame parts which are not galvanized shall be powder coated prior to any attachment of components. Parts which shall be powder coated shall include but are not limited to:
Steering gear bracket
Front splayed rails and fish plates
Bumper extensions
Cross members
Cross member gussets
Fuel tank mounting brackets
Fuel tank straps (unless material/finish is specified in 3130 subcat) Air tanks (unless color coded tanks are specified in 3205 subcat) Air tank mounting brackets
Exhaust mounting brackets
Air cleaner skid plate
Radiator skid plate
Battery supports, battery trays and battery covers
Other non-galvanized under carriage components which are received from the suppliers with coatings already applied shall include but are not limited to:
Suspension components
Front and rear axles
All powder coatings, primers and paint used on the non-galvanized components shall be compatible with all metals, pretreatments and primers used. The cross hatch adhesion test per ASTM D3359 shall not have a fail of more than ten (10) squares. The pencil hardness test per ASTM D3363 shall have a final post-curved pencil hardness of H-2H. The direct impact resistance test per ASTM D2794 shall have an impact resistance of 120.00 inches per pound at 2 mils.
FRAME ASSEMBLY STRUCTURAL
Purchaser shall receive a Frame Assembly Structural Fifty (50) Years or 250,000 Miles limited warranty in accordance with, and subject to, warranty certificate RFW0305. The warranty certificate is incorporated by reference into this proposal, and included with this proposal or available upon request.
FRAME RAIL CORROSION
Purchaser shall receive a Frame Rail Corrosion (Zinc Plate and Powder Coat) Twenty Five (25) Years or 150,000 Miles limited warranty in accordance with, and subject to, warranty certificate RFW0316. The warranty certificate is incorporated by reference into this proposal, and included with this proposal or available upon request.
FRAME COMPONENTS CORROSION
9.a
Packet Pg. 294 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Purchaser shall receive a Frame Components Corrosion (Powder Coat) Three (3) Years or 48,000 Miles limited warranty in accordance with, and subject to, warranty certificate RFW0313. The warranty certificate is incorporated by reference into this proposal, and included with this proposal or available upon request.
FRONT BUMPER
The chassis shall be equipped with a severe duty front bumper constructed from structural steel channel.
The bumper material shall be 0.38 thick ASTM A36 steel which shall measure 12.00 inches high with a
3.05 inch flange and shall be 104.50 inches wide with angled front corners.
The bumper shall be primed and painted as specified.
FRONT BUMPER EXTENSION LENGTH
The front bumper shall be extended approximately 21.00 inches ahead of the cab.
FRONT BUMPER PAINT
The front bumper shall be painted the same as the lower cab color. The front bumper trim shall feature a black spray on bedliner coating.
FRONT BUMPER TRIM
A stainless steel trim angle, painted to the customers specifications, shall be installed on the top corner of the bumper across the front and on the top corner of the bumper tails, terminating at the rearmost portion of the apron. The trim angle shall measure approximately 3.00 inches wide on the horizontal flange and 1.60 inches tall on the vertical flange. The trim shall be affixed to the bumper and bolted down to the apron with isolating washers.
FRONT BUMPER APRON
The 21.00 inch extended front bumper shall include an apron constructed of 0.19 inch thick embossed aluminum tread plate.
The apron shall be installed between the bumper and the front face of the cab affixed using stainless steel bolts attaching the apron to the top bumper flange.
FRONT BUMPER DISCHARGE
The chassis shall include frame mounted 2.50 inch diameter plumbed pipe intended for use as a discharge trash line. The discharge pipe shall be routed from the left hand front splay rail area behind the bumper to the area rear of the front axle, ahead of the battery box.
The discharge shall pipe shall be a, 2.50 inch stainless steel schedule 10 tube. The discharge shall include a Victaulic groove for connecting to the pump and discharge hose plumbing on each end of the tube.
The apparatus manufacturer shall plumb the discharge pipe to the pump and shall provide all valves as required.
FRONT BUMPER COMPARTMENT CENTER
The front bumper shall include a compartment in the bumper apron located in the center between the frame rails which may be used as a hose well. The compartment shall be constructed of 0.13 inch 5052-H32 grade aluminum and shall include drain holes in the bottom corners to allow excess moisture
9.a
Packet Pg. 295 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) to escape. The compartment shall be the full size of available space in the apron from the cab fascia to the bumper and 38.00 inches wide X 10.88 inches deep. The clear opening shall be 37.75 inches wide.
The compartment shall include a notched cover constructed of 0.19 inch thick bright embossed aluminum tread plate. The notch shall be located in the left front portion of the cover and shall be 4.00 inches in length with a 2.00 inches wide radius.
FRONT BUMPER COMPARTMENT COVER HARDWARE
The front bumper compartment cover(s) shall include gas cylinder stays which shall hold the cover open. Each cover shall be held in the closed position via a D-ring style latch.
MECHANICAL SIREN
The front bumper shall include an electro mechanical Federal Q2B siren, which shall be streamlined, chrome-plated and shall produce 123 decibels of sound at 10.00 feet. The Q2B siren produces a distinctive warning sound that is recognizable at long distances. A unique clutch design provides a longer coast down sound while reducing the amp draw to 100 amps. The siren shall measure 10.50 inches wide X 10.00 inches high X 14.00 inches deep. The siren shall include a pedestal mount to surface mount on a horizontal surface.
MECHANICAL SIREN LOCATION
The siren shall be pedestal mounted on the bumper apron on the furthest outboard section of the bumper on the officer side.
AIR HORN
The front bumper shall include two (2) Hadley brand E-Tone air horns which shall measure 21.00 inches long with a 6.00 inch round flare. The air horns shall be trumpet style with a chrome finish on the exterior and a painted finish deep inside the trumpet.
AIR HORN LOCATION
The air horns shall be recess mounted in the front bumper face, one (1) on the right side of the bumper in the outboard position relative to the right hand frame rail and one (1) on the left side of the bumper in the outboard position relative to the left hand frame rail.
AIR HORN RESERVOIR
One (1) air reservoir, with a 2084 cubic inch capacity, shall be installed on the chassis to act as a supply tank for operating air horns. The reservoir shall be isolated with a 90 PSI pressure protection valve on the reservoir supply side to prevent depletion of the air to the air brake system.
ELECTRONIC SIREN SPEAKER
There shall be two (2) Cast Products Inc. model SA4301, 100 watt speakers provided. Each speaker shall measure 6.20 inches tall X 7.36 inches wide X 3.06 inches deep. Each speaker shall include a flat mounting flange which shall be polished aluminum.
ELECTRONIC SIREN SPEAKER LOCATION
The two (2) electronic siren speakers shall be located on the front bumper face outboard of the frame rails with one (1) on the right side and one (1) on the left side in the inboard positions.
FRONT BUMPER TOW HOOKS
Two (2) heavy duty tow hooks, painted to match the frame components, shall be installed below the front bumper in the forward position, bolted directly to the underside of each chassis frame rail with
9.a
Packet Pg. 296 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) grade 8 bolts.
CAB HEIGHT ADJUSTMENT
The cab shall include 0.75 inch thick shims raising the cab to provide additional clearance under the cab.
CAB TILT SYSTEM
The entire cab shall be capable of tilting approximately 45-degrees to allow for easy maintenance of the engine and transmission. The cab tilt pump assembly shall be located on the right side of the chassis above the battery box.
The electric-over-hydraulic lift system shall include an ignition interlock and red cab lock down indicator lamp on the tilt control which shall illuminate when holding the "Down" button to indicate safe road operation.
It shall be necessary to activate the master battery switch and set the parking brake in order to tilt the cab. As a third precaution the ignition switch must be turned off to complete the cab tilt interlock safety circuit.
Two (2) spring-loaded hydraulic hold down hooks located outboard of the frame shall be installed to hold the cab securely to the frame. Once the hold-down hooks are set in place, it shall take the application of pressure from the hydraulic cab tilt lift pump to release the hooks.
Two (2) cab tilt cylinders shall be provided with velocity fuses in each cylinder port. The cab tilt pivots shall be 1.90 inch ball and be anchored to frame brackets with 1.25 inch diameter studs.
A steel safety channel assembly, painted safety yellow shall be installed on the right side cab lift cylinder to prevent accidental cab lowering. The safety channel assembly shall fall over the lift cylinder when the cab is in the fully tilted position. A cable release system shall also be provided to retract the safety channel assembly from the lift cylinder to allow the lowering of the cab.
CAB TILT AUXILIARY PUMP
A manual cab tilt pump module shall be attached to the cab tilt pump housing/power distribution box.
CAB TILT LIMIT SWITCH
A cab tilt limit switch shall be installed. The switch will effectively limit the travel of the cab when being tilted. The limit adjustment of the switch shall be preset by the chassis manufacturer to prevent damage to the cab or any bumper mounted option mounted in the cab tilt arc. Further adjustment to the limit by the apparatus manufacturer shall be available to accommodate additional equipment.
CAB TILT CONTROL RECEPTACLE
A 25.00 foot cab tilt control harness shall be provided on the right side of frame just behind the cab.
This harness shall consist of an 8.00 foot harness connected to the tilt pump and a 17.00 foot extension harness with a six (6) pin Deutsch connector with cap for mounting in a compartment in the body.
The remote control pendant shall include 20.00 feet of cable with a mating Deutsch connector. The remote control pendant shall be shipped loose with the chassis.
CAB TILT LOCK DOWN INDICATOR
9.a
Packet Pg. 297 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The cab dash shall include a message located within the dual air pressure gauge which shall alert the driver when the cab is unlocked and ajar. The alert message shall cease to be displayed when the cab is in the fully lowered position and the hold down hooks are secured and locked to the cab mounts.
In addition to the alert message an audible alarm shall sound when the cab is unlocked and ajar and the parking brake is released.
CAB WINDSHIELD
The cab windshield shall have a surface area of 2969.88 square inches and be of a two (2) piece wraparound design for maximum visibility.
The glass utilized for the windshield shall include standard automotive tint. The left and right windshield shall be fully interchangeable thereby minimizing stocking and replacement costs.
Each windshield shall be installed using black self locking window rubber.
GLASS FRONT DOOR
The front cab doors shall include a window which is 27.00 inches in width X 26.00 inches in height.
These windows shall have the capability to roll down completely into the door housing. This shall be accomplished using electric actuation. The left and right front door windows shall be controlled using a switch on each respective side inner door panel. The drivers door shall include a switch for each powered door window in the cab.
There shall be an irregular shaped fixed window which shall measure 2.50 inches wide at the top, 8.00 inches wide at the bottom X 26.00 inches in height, more commonly known as "cozy glass" ahead of the front door roll down windows.
The windows shall be mounted within the frame of the front doors trimmed with a black ring on the exterior.
GLASS TINT FRONT DOOR
The windows located in the left and right front doors shall include a dark gray automotive tint which shall allow forty-five percent (45%) light transmittance. The dark tint shall aid in cab cooling and help protect passengers from radiant solar energy.
GLASS REAR DOOR RH
The rear right hand side crew door shall include a window which is 27.00 inches in width X 26.00 inches in height. The window shall be a powered type and shall be controlled by a switch on the door panel ledge and on the drivers control panel.
GLASS TINT REAR DOOR RIGHT HAND
The window located in the right hand side rear window shall include a dark gray automotive tint which shall allow forty-five percent (45%) light transmittance. The dark tint shall aid in cab cooling and help protect passengers from radiant solar energy.
GLASS REAR DOOR LH
The rear left hand side crew door shall include a window which is 27.00 inches in width X 26.00 inches in height. The window shall be a powered type and shall be controlled by a switch on the door panel ledge and on the drivers control panel.
9.a
Packet Pg. 298 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
GLASS TINT REAR DOOR LEFT HAND
The window located in the left hand side rear door shall include a dark gray automotive tint which shall allow forty-five percent (45%) light transmittance. The dark tint shall aid in cab cooling and help protect passengers from radiant solar energy.
GLASS SIDE MID RH
The cab shall include a window on the right side behind the front and ahead of the crew doors which shall measure 16.00 inches wide X 12.00 inches high. This window shall be fixed within this space and shall be rectangular in shape. The window shall be mounted using self-locking window rubber. The glass utilized for this window shall include a green automotive tint unless otherwise noted.
GLASS TINT SIDE MID RIGHT HAND
The window located on the right hand side of the cab between the front and rear doors shall include a dark gray automotive tint which shall allow forty-five percent (45%) light transmittance. The dark tint shall aid in cab cooling and help protect passengers from radiant solar energy.
GLASS SIDE MID LH
The cab shall include a window on the left side behind the front door and ahead of the crew door and above the wheel well which shall measure 16.00 inches wide X 26.00 inches high. This window shall be fixed within this space and shall be rectangular in shape. The window shall be mounted using self locking window rubber. The glass utilized for this window shall include a green automotive tint unless otherwise noted.
GLASS TINT SIDE MID LEFT HAND
The window located on the left hand side of the cab between the front and rear doors shall include a dark gray automotive tint which shall allow forty-five percent (45%) light transmittance. The dark tint shall aid in cab cooling and help protect passengers from radiant solar energy.
CLIMATE CONTROL
A ceiling mounted combination defroster and cabin heating and air conditioning system shall be located above the engine tunnel area. The system covers and plenums shall be of severe duty design made of aluminum which shall be coated with a customer specified interior paint. The design of the systems covers shall provide quick access to washable air intake filters as well as easy access to other serviceable items.
The air delivery plenums provide targeted airflow directly to the vehicle occupants. Six (6) adjustable louvers will provide comfort for the front seat occupants and ten (10) adjustable louvers will provide comfort for the rear crew occupants.
The system shall be capable of producing up to 12 FPM of air velocity at all occupant seating positions.
Separate front and rear blower motors shall be of brushless design and shall be controlled independently.
It shall be capable of reducing the interior cabin air temperature from 122 F (+/- 3 F) to 80 F in thirty minutes with 50% relative humidity and full solar load as described in SAE J2646.
The system shall also provide heater pull up performance which meets or exceeds the performance requirements of SAE J1612 as well as defrost performance that meets or exceeds the performance requirements of SAE J381.
9.a
Packet Pg. 299 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) A gravity drain system shall be provided that is capable of evacuating condensate from the vehicle while on a slope of up to a 13% grade in any direction.
The air conditioning system plumbing shall be a mixture of custom bent zinc coated steel fittings and Aeroquip flexible hose with Aeroquip EZ-Clip fittings.
The overhead heater/defroster plumbing shall include an electronic flow control valve that re-directs hot coolant away from the evaporator, via a bypass loop, as the temperature control is moved toward the cold position.
Any component which needs to be accessed to perform system troubleshooting shall be accessible by one person using basic hand tools. Regularly serviced items shall be replaceable by one person using basic hand tools.
**The chassis manufacturer recommends that the overall climate system performance be based off third-party testing in accordance with the Society of Automotive Engineering standards as a complete system.
Individual component level BTU ratings is not an accurate indicator of the performance capability of the completed system. System individual component BTU ratings: Air conditioning evaporator total BTU/HR: 82,000 Air conditioning condenser total BTU/HR: 59,000
Heater coil total BTU/HR: 98,000
Performance data specified is based on testing performed by an independent third-party test facility using a medium four-door 10" raised roof cab equipped with an ISL engine.
CLIMATE CONTROL DRAIN
The climate control system shall include a gravity drain for water management. The gravity drain shall remove condensation from the air conditioning system without additional mechanical assistance.
CLIMATE CONTROL ACTIVATION
The heating, defrosting and air conditioning controls shall be in the center dash center switch panel, in a position which is easily accessible to the driver. The climate control shall be activated by a rotary switch.
HVAC OVERHEAD COVER PAINT
The overhead HVAC cover shall be painted with a multi-tone onyx black texture finish.
A/C CONDENSER LOCATION
A roof mounted A/C condenser shall be installed on the left side of the cab, mid-roof.
A/C COMPRESSOR
The air-conditioning compressor shall be a belt driven, engine mounted compressor. The compressor shall be compatible with R134-a refrigerant.
**The chassis manufacturer recommends that the overall climate system performance be based off third-party testing in accordance with the Society of Automotive Engineering standards as a complete system.
9.a
Packet Pg. 300 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Individual component level ratings are not an accurate indicator of the performance capability of the completed system.
Refrigerant Compressor displacement: 19.1 cubic inches per revolution.
UNDER CAB INSULATION
The underside of the cab tunnel surrounding the engine shall be lined with multi-layer insulation, engineered for application inside diesel engine compartments.
The insulation shall act as a noise barrier, absorbing noise thus keeping the decibel level in the cab well within NFPA recommendations. As an additional benefit, the insulation shall assist in sustaining the desired temperature within the cab interior.
The engine tunnel insulation shall measure approximately 0.30 inch thick including a multi-layer foil faced glass cloth and polyester fiber layer. The foil surface acts as protection against heat, moisture and other contaminants. The insulation shall meet or exceed FMVSS 302 flammability test.
The cab floor insulation shall measure 0.56 inch thick including a 1.0#/sf PVC barrier and a moisture and heat reflective foil facing, reinforced with fiberglass strands. The foil surface acts as protection against moisture and other contaminants. The insulation shall meet or exceed FMVSS 302 flammability test.
The insulation shall be cut precisely to fit each section and sealed for additional heat and sound deflection. The insulation shall be held in place by acrylic pressure sensitive adhesive. In addition, the insulation on the underside of the cab floor shall have aluminum pins with hard hat, hold in place fastening heads and an expanded metal overlay to assist in retaining the insulation tight against the cab.
The insulation inside the tunnel shall have a removable aluminum overlay installed to protect the insulation and assist in retaining the insulation tight against the engine tunnel surfaces.
The cab floor insulation shall cover the driver and officer floor areas as well as all crew floor areas and compartment floor areas if applicable.
INTERIOR TRIM FLOOR
The floor of the cab shall be covered with a multi-layer mat consisting of 0.25 inch thick sound absorbing closed cell foam with a 0.06 inch thick non-slip vinyl surface with a pebble grain finish. The covering shall be held in place by a pressure sensitive adhesive and embossed treadplate trim that shall wrap 2" horizontally and vertically. All exposed seams shall be sealed with silicone caulk matching the color of the floor mat to reduce the chance of moisture and debris retention.
INTERIOR TRIM
The cab interior shall include trim on the front ceiling, rear crew ceiling, and the cab walls. It shall be easily removable to assist in maintenance. The trim shall be constructed of insulated vinyl over a hard board backing.
REAR WALL INTERIOR TRIM
The rear wall of the cab shall be trimmed with vinyl.
HEADER TRIM
9.a
Packet Pg. 301 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The cab interior shall feature header trim over the driver and officer dash constructed of 5052-H32 Marine Grade, 0.13 inch thick aluminum.
TRIM CENTER DASH
The main center dash area shall be constructed of 5052-H32 Marine Grade, 0.13 inch thick aluminum plate. There shall be four (4) holes located on the top of the dash near each outer edge of the electrical access cover for ventilation. The center dash electrical access cover shall include a gas cylinder stay which shall hold the cover open during maintenance.
TRIM LH DASH
The left hand dash shall be constructed of 5052-H32 Marine Grade, 0.13 inch thick aluminum plate for a perfect fit around the instrument panel. For increased occupant protection the extreme duty left hand dash utilizes patent pending break away technology to reduce rigidity in the event of a frontal crash. The left hand dash shall offer lower vertical surface area to the left and right of the steering column to accommodate control panels.
TRIM RH DASH
The right hand dash shall be constructed of 5052-H32 Marine Grade, 0.13 of an inch thick aluminum plate and shall include a glove compartment with a hinged door and a Mobile Data Terminal (MDT) provision. The glove compartment size will measure 14.00 inches wide X 4.50 inches high X 5.88 inches deep. The MDT provision shall be provided above the glove compartment.
ENGINE TUNNEL TRIM
The cab engine tunnel shall be covered with a multi-layer mat consisting of 0.25 inch closed cell foam with a 0.06 inch thick non-slip vinyl surface with a pebble grain finish. The mat shall be held in place by pressure sensitive adhesive. The engine tunnel mat shall be trimmed with anodized aluminum stair nosing trim for an aesthetically pleasing appearance.
POWER POINT DASH MOUNT
The cab shall include two (2) Powerwerx combination fast charging (USB) and (USB) type-C power delivery receptacles in the cab dash switch panel to provide a power source for USB chargeable electrical equipment. The USB receptacle shall be capable of 1.5 amp output and the USB type C receptacle shall be capable of a 3.0 amp output. The receptacles shall be wired battery direct.
STEP TRIM
Each cab entry door shall include a three step entry. The first step closest to the ground shall be constructed of SAE 304 stainless steel with embossed perforations and diamond shaped cutout. The perforations and cutouts shall allow water and other debris to flow through rather than becoming trapped within the stepping surface. The stainless steel material shall have a number 8 mirror finish. The lower step shall be mounted to a frame which is integral with the construction of the cab for rigidity and strength. The middle step shall be integral with the cab construction and shall be trimmed in 0.08 inch thick 3003-H22 embossed aluminum tread plate.
STEP TRIM KICKPLATE
The cab steps shall include a kick plate in the rise of each step. The risers shall be trimmed in 3003-H22 bright aluminum tread-plate which is 0.07 inch thick.
UNDER CAB ACCESS DOOR
The cab shall include an aluminum access door in the left crew step riser painted to match the cab
9.a
Packet Pg. 302 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) interior paint with a push and turn latch. The under cab access door shall provide access to the diesel exhaust fluid fill.
INTERIOR DOOR TRIM
The interior trim on the doors of the cab shall consist of an aluminum panel constructed of Marine Grade 5052-H32 0.13 of an inch thick aluminum plate. The door panels shall include a painted finish.
CAB DOOR TRIM REFLECTIVE
In accordance with the current standards of NFPA, the body builder shall provide 96.00 square inches of reflective material on the interior of each cab door.
INTERIOR GRAB HANDLE "A" PILLAR
There shall be two (2) rubber covered 11.00 inch grab handles installed inside the cab, one on each "A" post at the left and right door openings. The left handle shall be located 7.88 inches above the bottom of the door window opening and the right handle shall be located 2.88 inches above the bottom of the door window opening. The handles shall assist personnel in entering and exiting the cab.
INTERIOR GRAB HANDLE FRONT DOOR
Each front door shall include one (1) ergonomically contoured 9.00 inch cast aluminum horizontal grab handle which shall be located at the upper-most center of the door panel, and one (1) 9.00 inch vertical grab handle which shall be located outboard of the paddle latch at the center of the door panel. Each handle shall feature a DA sand finish and assist personnel entering and exiting the cab.
INTERIOR GRAB HANDLE REAR DOOR
A DA sanded cast aluminum assist handle shall be provided on the inside of each rear crew door. A
30.00 inch long handle shall extend horizontally the width of the window just above the window sill.
The handle shall assist personnel in exiting and entering the cab.
INTERIOR SOFT TRIM COLOR
The cab interior soft trim surfaces shall be gray in color.
INTERIOR TRIM SUNVISOR
The header shall include two (2) sun visors, one each side forward of the driver and officer seating positions above the windshield. Each sun visor shall be constructed of Masonite and covered with padded vinyl trim.
INTERIOR FLOOR MAT COLOR
The cab interior floor mat shall be gray in color.
CAB PAINT INTERIOR DOOR TRIM
The inner door panel surfaces shall be painted with multi-tone onyx black texture finish.
HEADER TRIM INTERIOR PAINT
The metal surfaces in the header area shall be coated with multi-tone onyx black texture finish.
TRIM CENTER DASH INTERIOR PAINT
The entire center dash shall be coated with multi-tone onyx black texture finish. Any accessory pods attached to the dash shall also be painted this color.
TRIM LH DASH INTERIOR PAINT
9.a
Packet Pg. 303 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The left hand dash shall be painted with a multi-tone onyx black texture finish.
TRIM RIGHT HAND DASH INTERIOR PAINT
The right hand dash shall be painted with multi-tone onyx black texture finish.
DASH PANEL GROUP
The main center dash area shall include three (3) aluminum removable panels located one (1) to the right of the driver position, one (1) in the center of the dash and one (1) to the left of the officer position. The panels shall be coated with a black texture finish. The center panel shall be within comfortable reach of both the driver and officer.
SWITCHES CENTER PANEL
The center dash panel shall include no rocker switches or legends.
SWITCHES LEFT PANEL
The left dash panel shall include five (5) switches. There shall be three (3) across the top of the panel with two (2) below. Two (2) of the top row of switches shall be rocker type and the left one (1) shall be the windshield wiper/washer control switch. The lower switches shall be a rocker type switch.
A rocker switch with a blank legend installed directly above shall be provided for any position not designated by a specific option. The non-designated switches shall be two-position, black switches with a green indicator light. Each blank switch legend can be custom engraved by the body manufacturer. All switch legends shall have backlighting provided.
SWITCHES RIGHT PANEL
The right dash panel shall include six (6) rocker switch positions in a three (3) over three (3) switch configuration.
A rocker switch with a blank legend installed directly above shall be provided for any position without a switch and legend designated by a specific option. The non-specified switches shall be two-position, black switches with a green indicator light. Each blank switch legend can be custom engraved by the body manufacturer. All switch legends shall have backlighting provided.
SEAT BELT WARNING
A seat belt warning system, integrated with the Vehicle Data Recorder system, shall be installed for each seat within the cab. The system shall provide a visual warning indicator in the vehicle display and control screen(s).
The warning system shall activate when any seat is occupied with a minimum of 60 pounds, the corresponding seat belt remains unfastened, and the park brake is released. The warning system shall also activate when any seat is occupied, the corresponding seat belt was fastened in an incorrect sequence, and the park brake is released. Once activated, the visual indicators and applicable audible alarm shall remain active until all occupied seats have the seat belts fastened.
SEAT MATERIAL
The USSC Valor seats shall include military grade high strength, wear resistant fabric made of durable ballistic polyester. A synthetic coating shall be bonded to the back side of the material to help protect the seats from UV rays and from being saturated or contaminated by fluids. The fabric shall include the
9.a
Packet Pg. 304 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) integration VALORTech XD®, a proprietary antimicrobial agent, designed to resist toxicity and contaminants. If applicable, Theatre style seats located in the cab shall be high strength, wear resistant fabric made of durable ballistic polyester. A PVC coating shall be bonded to the back side of the material to help protect the seats from UV rays and from being saturated or contaminated by fluids. Common trade names for this material are Imperial 1200 and Durawear.
SEAT COLOR
All seats supplied with the chassis shall be black in color. All seats shall include red seat belts.
SEAT DRIVER
The driver's seat shall be a USSC Valor M Series Magnus air suspension. The four-way seat shall feature a 3.00 inches vertical travel air suspension and manual fore and aft adjustment with 9.40 inches of travel. The suspension control shall be located on the seat below the front of the cushion. The seat shall include red LED lighting in the seat base. The seat shall also feature integral springs to isolate shock.
The seat shall feature an all belts to seat (ABTS) style of safety restraint. The ABTS feature shall include a three-point shoulder harness with the lap belt, automatic retractor and the Suspension Seat Safety System (S4S) as an integral part of the seat assembly. The suspension integrated S4S shall create smaller packaging and eliminate the need to remote mount and tether through the cab floor. The buckle portion of the seat belt shall extend from the seat base towards the driver position within easy reach of the occupant.
This model of seat shall have successfully completed the static load tests set forth by FMVSS 207/210.
This testing shall include a simultaneous forward load of 3000 pounds each on the lap and shoulder belts and twenty (20) times the weight through the center of gravity.
The materials used in construction of the seat shall also have successfully completed testing regarding the flammability of materials used in the occupant compartments of motor vehicles as outlined in FMVSS 302, of which dictates the allowable burning rate of materials in the occupant compartments of motor vehicles.
SEAT BACK DRIVER
The drivers seat shall include a standard seat back incorporating the all belts to seat feature (ABTS) as described above. The seat back shall recline up to 19-degrees.
SEAT MOUNTING DRIVER
The drivers seat shall be installed in an ergonomic position in relation to the cab dash.
OCCUPANT PROTECTION DRIVER
The drivers position shall be equipped with the IMMI 4Front and RollTek Systems which shall secure belted occupants and increase the survivable space within the cab. The 4Front and RollTek Systems shall selectively deploy integrated systems to protect against injuries in qualifying frontal impact, and rollover events.
The Drivers seating area protection shall include:
9.a
Packet Pg. 305 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Drivers airbag DAB - inflates a steering wheel airbag to protect the head and neck of the driver.
Drivers knee airbag DKAB - inflating knee bolster airbags to protect the knees. Integrated roll sensor IRS - detects an imminent rollover, activates protective devices and records crash events.
Integrated belt pretension ICP - device for air ride seats tightens the seat belt, securing driver in seat and positions driver for contact with seat integrated head cushion side roll airbag. Seat pull-down system S4S - device for air seats locks seat to lowest position, increases survivable space.
Inflatable Head Cushion seat integrated Side Roll Airbag SRA - protects driver's head/neck and shields driver from dangerous surfaces.
SEAT OFFICER
The officers seat shall be a USSC Valor M Series Magnus air suspension. The four-way seat shall feature a 3.00 inches vertical travel air suspension and manual fore and aft adjustment with 9.40 inches of travel. The suspension control shall be located on the seat below the front of the cushion. The seat shall also feature integral springs to isolate shock.
The seat shall feature an all belts to seat (ABTS) style of safety restraint. The ABTS feature shall include a three-point shoulder harness with the lap belt, automatic retractor and the Suspension Seat Safety System (S4S) as an integral part of the seat assembly. The suspension integrated S4S shall create smaller packaging and eliminate the need to remote mount and tether through the cab floor. The buckle portion of the seat belt shall extend from the seat base towards the driver position within easy reach of the occupant.
The minimum vertical dimension from the seat H-point to the ceiling for this belted seating position shall be 37.00 inches measured with the seat suspension height adjusted to the upper limit of its travel.
This model of seat shall have successfully completed the static load tests by FMVSS 207/210. This testing shall include a simultaneous forward load of 3000 pounds each on the lap and shoulder belts and twenty (20) times the weight through the center of gravity. The model of seats shall also have successfully completed the flammability of materials used in the occupant compartments of motor vehicles as outlined in FMVSS 302, of which decides the burning rate of materials in the occupant compartments of motor vehicles.
SEAT BACK OFFICER
The officers seat shall include a standard seat back incorporating the all belts to seat feature (ABTS) as described above. The seat back shall recline up to 19-degrees.
SEAT MOUNTING OFFICER
The officers seat shall be installed in an ergonomic position in relation to the cab dash.
OCCUPANT PROTECTION OFFICER
9.a
Packet Pg. 306 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The officers position shall be equipped with the IMMI 4Front and RollTek Systems which shall secure belted occupants and increase the survivable space within the cab. The 4Front and RollTek Systems shall selectively deploy integrated systems to protect against injuries in qualifying frontal impact, and rollover events.
The Officers seating area protection shall include:
Officers knee airbag OKAB - inflating knee bolster airbags to protect the knees. Integrated roll sensor IRS - detects an imminent rollover, activates protective devices and records crash events.
Integrated belt pretension ICP - device for air ride seats tightens the seat belt, securing officer in seat and positioning officer for contact with seat integrated head cushion side roll airbag.
Seat pull-down system S4S - device for air seats locks seat to lowest position, increases survivable space.
Inflatable head cushion seat integrated side roll airbag SRA - protects officers head/neck and shields officer from dangerous surfaces.
SEAT BELT ORIENTATION CREW
The crew position seat belts shall follow the standard orientation which extends from the outboard shoulder extending to the inboard hip.
SEAT FORWARD FACING OUTER LOCATION
The crew area shall include two (2) forward facing outboard seats, which include one (1) located next to the outer wall of the cab on the left side of the cab and one (1) located next to the outer wall on the right side of the cab.
The primary position designation per NFPA 1900 2024 edition, shall only declare the positioning in the cab offers a minimum width of 27.60 inches of shoulder clearance without overlap of any other primary seating position and a minimum of 10.80 inches each side of seat center line. Clear width may be offset from center of seat cushion by up to 3.00 inches. It shall also offer a minimum of 22.00 inches of shoulder width clearance without any overlap of any position.
SEAT CREW FORWARD FACING OUTER
The crew area shall include a seat in the forward facing outer position which shall be a theatre style series. The seat shall feature a padded seat cushion which shall be hinged and attached to the wall providing optimum space savings. The seat shall remain in the stored position until occupied.
The minimum vertical dimension from the seat H-point to the ceiling for each belted seating position shall be 35.00 inches.
The buckle portion of the seat belt shall be mounted on a rigid or semi-rigid stalk such that the buckle remains positioned in an accessible location. The seat belt assembly anchorages shall conform to the Federal Safety Standard (FMVSS) No. 210, "Seat belt assembly anchorages".
9.a
Packet Pg. 307 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) This model of seat shall have successfully completed the static load tests by FMVSS 207/210. This testing shall include a simultaneous forward load of 3000 pounds each on the lap and shoulder belts and twenty (20) times the weight through the center of gravity. This model of seat installed in the cab model, as specified, shall have successfully completed the dynamic sled testing using FMVSS 208 as a guide with the following accommodations. In order to reflect the larger size outfitted firefighters, the test dummy used shall be a 95th percentile hybrid III male weighing 225 pounds rather than the 50th percentile male dummy weighing 165 pounds as referenced in FMVSS 208. The model of seats shall also have successfully completed the flammability of materials used in the occupant compartments of motor vehicles as outlined in FMVSS 302, of which decides the burning rate of materials in the occupant compartments of motor vehicles.
SEAT BACK FORWARD FACING OUTER
The crew area shall include a seat in the forward facing outer position which shall be a theatre style seat.
The rear wall padded trim shall act as the backrest for each seat.
There shall be a red, three-point shoulder harness with lap belt and an automatic retractor attached to the cab and available to the seat. The buckle portion of the seat belt shall be mounted on a rigid or semi-rigid stalk such that the buckle remains positioned in an accessible location. The seat belt assembly anchorages shall conform to the Federal Safety Standard (FMVSS) No. 210, "Seat belt assembly anchorages".
SEAT MOUNTING FORWARD FACING OUTER
The forward facing outer seat shall be mounted in the furthest outboard position facing the front of the cab.
OCCUPANT PROTECTION FFO
The forward facing outer seat positions shall be equipped with the RollTek rollover occupant protection system which shall secure occupants, increase the survivable space within the cab and protect against head/neck injuries in the event of a roll over accident.
The system shall function using a microprocessor-controlled, solid-state sensing device which, when the system detects a side roll shall provide instantaneous occupant protection (less than 0.3 seconds from trigger to total deployment) by automatically initiating the following sequence:
1. The seat belt shall tighten around the occupant.
System Components Shall Include:
Integrated Roll Sensor IRS - detects an imminent rollover, activates protective devices and records crash events.
Integrated Belt Pretension IBP with flip-up (non theatre) and fixed mechanical seats - tightens the seat belt around occupant, securing occupant in seat.
Integrated Gas Pretension IGP with flip-up theatre style seats - tightens the seat belt around occupant, securing occupant in seat.
SEAT FORWARD FACING CENTER LOCATION
The crew area shall include two (2) forward facing center crew seats with both located at the center of
9.a
Packet Pg. 308 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) the rear wall.
SEAT CREW FORWARD FACING CENTER
The crew area shall include a seat in the forward facing center position which shall be a USSC Valor ABTS Crew series. The seat shall feature an 18.00 inches wide padded seat cushion. The seat shall include a "Flip and Hold" feature so that the cushion shall remain in the seated position and simply touched to flip up.
The seat shall feature an all belts to seat (ABTS) style of safety restraint. The ABTS feature shall include a three-point shoulder harness with the lap belt and automatic retractor as an integral part of the seat assembly. The buckle portion of the seat belt shall extend from the seat base towards the driver position within easy reach of the occupant.
The minimum vertical dimension from the seat H-point to the ceiling for each belted seating position shall be 35.00 inches.
This model of seat shall have successfully completed the static load tests by FMVSS 207/210. This testing shall include a simultaneous forward load of 3000 pounds each on the lap and shoulder belts and twenty (20) times the weight through the center of gravity. The model of seats shall also have successfully completed the flammability of materials used in the occupant compartments of motor vehicles as outlined in FMVSS 302, of which decides the burning rate of materials in the occupant compartments of motor vehicles.
SEAT BACK FORWARD FACING CENTER
The crew area seat backs shall include an IMMI brand SmartDock® Gen 2 hands-free self contained breathing apparatus (SCBA) holder. The hands-free holder shall meet NFPA 1901-03 9G dynamic requirements for cylinder restraint systems for use in crew compartments of emergency response vehicles. The bracket shall accommodate and secure most types of self-contained breathing apparatus cylinders.
The hands-free holder shall consist of a back plate, bottom cradle, non-marring top claws, and claw height adjustment knob. The height adjustment knob shall allow for easy adjustment of the claws to the SCBA. The hands-free holder's claws shall lock from inertial forces to prevent the SCBA from becoming a projectile in the event of a crash to meet the NFPA 1901-03 standard for SCBA retention.
The SCBA holder shall offer single-motion insertion into the claws and hands-free release when the SCBA fitted seat occupant rises.
OCCUPANT PROTECTION FFC
The forward facing center seat positions shall be equipped with the RollTek rollover occupant protection system which shall secure occupants, increase the survivable space within the cab and protect against head/neck injuries in the event of a rollover accident.
The system shall function using a microprocessor-controlled, solid-state sensing device which, when the system detects a side roll shall provide instantaneous occupant protection (less than 0.3 seconds from trigger to total deployment) by automatically initiating the following sequence:
1. The seat belt shall tighten around the occupant.
System Components Shall Include:
9.a
Packet Pg. 309 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Integrated Roll Sensor IRS - detects an imminent rollover, activates protective devices and records crash events.
Integrated Belt Pretension IBP with flip-up (non theatre) and fixed mechanical seats - tightens the seat belt around occupant, securing occupant in seat.
Integrated Gas Pretension IGP with flip-up theatre style seats - tightens the seat belt around occupant, securing occupant in seat.
SEAT FRAME FORWARD FACING
The forward facing center seating positions shall include an enclosed seat frame located and installed on the rear wall. The seat frame shall measure 42.38 inches wide X 12.38 inches high X 22.00 inches deep. The seat frame shall be constructed of Marine Grade 5052-H32 0.19 inch thick aluminum plate.
The seat box shall be painted with the same color as the remaining interior.
SEAT FRAME FORWARD FACING STORAGE ACCESS
There shall be two (2) access points to the seat frame storage area, one (1) on each side of the seat frame. Each access point shall be covered by a hinged door which measures 15.00 inches in width X
10.63 inches in height with an opening that measures 13.75 inches wide X 10.00 inches high.
SEAT MOUNTING FORWARD FACING CENTER
The forward facing center seats shall be installed facing the front of the cab.
SEAT COMPARTMENT DOOR FINISH
All underseat storage compartment access doors shall have a multi-tone onyx black texture finish.
WINDSHIELD WIPER SYSTEM
The cab shall include a triple arm linkage wiper system which shall clear the windshield of water, ice and debris. There shall be two (2) windshield wipers; each shall be affixed to a radial arm. The wiper motor shall be activated by an intermittent wiper control located within easy reach of the drivers position. The windshield wipers shall be interlocked with the park brake allowing activation only when the park brake is released.
There shall be virtual button on the vehicle display and control screen to override the park brake deactivation. This will reset when the park brake is cycled.
ELECTRONIC WINDSHIELD FLUID LEVEL INDICATOR
The windshield washer fluid level shall be monitored electronically. When the washer fluid level becomes low the yellow "Check Message Center" indicator light on the instrument panel shall illuminate and the message center in the dual air pressure gauge shall display a "Check Washer Fluid Level" message.
CAB DOOR HARDWARE
The cab entry doors shall be equipped with exterior pull handles, suitable for use while wearing firefighter gloves. The handles shall be made of aluminum with a gloss black finish.
9.a
Packet Pg. 310 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The interior exit door handles shall be flush paddle type with a black finish, which are incorporated into the upper door panel.
All cab entry doors shall include locks which are keyed alike. The door locks shall be designed to prevent accidental lockout.
DOOR LOCKS
The cab entry doors shall include a Controller Area Network (CAN) based electronic door lock system which shall include two (2) external keypads, one (1) located on the left side next to the front grab handle and one (1) on the right side next to the front grab handle. There shall be one (1) red rocker switch provided on the inside of each front cab entry door to actuate the cab door locks. Each door lock may also be manually actuated from the inside of the cab by means of a red knob located on the paddle handle of the respective door. The electronic door lock system shall include four (4) key fobs for actuation with buttons for cab entry door locks and for compartment door locks.
When the doors are unlocked using the external keypad or the key fobs the interior dome lights shall illuminate and remain on for a period of twenty (20) seconds. The interior dome safety feature shall require the interior lighting power to be battery direct.
Wiring shall also be provided for up to four (4) exterior cab compartments and up to four (4) body compartments.
DOOR LOCK LH EMS COMPARTMENT
The left hand side EMS compartment shall feature a power door lock actuator.
DOOR LOCK RH EMS COMPARTMENT
The right hand side EMS compartment shall feature a power door lock actuator.
POWER DOOR LOCK COMPARTMENT ACTIVATION
The power door lock feature shall include activation for exterior compartment door locks through the key fob and keypads.
GRAB HANDLES
The cab shall include one (1) 18.00 inch three-piece knurled aluminum anti-slip exterior grab handle behind each cab door. The Hansen Anti-Slip Rails shall be mounted in bright anodized aluminum 4000 Series II stanchions, complete with weep holes to prevent the buildup of moisture.
The grab rails shall include red reflective tape.
LIGHTED GRAB HANDLES
The grab rails shall include a 12 volt, 17.00 inch long clear LED light to provide an increased margin of safety for night time cab entry and egress.
REARVIEW MIRRORS
Retrac Aerodynamic West Coast style dual vision mirror heads model 613305 shall be provided and installed on each of the front cab doors.
The mirrors shall be mounted via 1.00 inch diameter tubular stainless steel arms to provide a rigid mounting to reduce mirror vibration.
9.a
Packet Pg. 311 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The mirrors shall measure 8.00 inches wide X 19.00 inches high and shall include an integral convex mirrors installed in the mirror head below the flat glass to provide a wider field of vision. The flat and convex mirrors shall be motorized with remote horizontal and vertical adjustment. The control switches shall be mounted within easy reach of the driver. The flat and convex mirrors shall be heated for defrosting in severe cold weather conditions.
The mirrors shall be constructed of a vacuum formed chrome plated ABS plastic housing that is corrosion resistant and shall include the finest quality non-glare glass.
REARVIEW MIRROR HEAT SWITCH
The heat for the rearview mirrors shall be controlled through a virtual button on the vehicle display and control screen.
EXTERIOR TRIM REAR CORNER
There shall be an overlay of 3003-H22 aluminum tread plate which shall be 0.07 inches thick on the outside corners at the back of the cab. The overlay shall wrap 1.00 inches forward on the sides of the cab and 12.00 inches inboard on the rear wall.
CAB FENDER
Wheel well liners shall be integrated into cab design and include a bed liner undercoat to limit road splash and enable easier cleaning. Each outer fenderette shall be 3.50 inches wide made of SAE 304 polished stainless steel.
MUD FLAPS FRONT
The front wheel wells shall have mud flaps installed on them.
CAB EXTERIOR FRONT & SIDE EMBLEMS
The cab shall include three (3) Spartan emblems. There shall be one (1) installed on the front air intake grille and two (2) for the exterior sides of the cab shipped loose with the chassis for installation by the body manufacturer.
CAB EXTERIOR MODEL NAMEPLATE
The cab shall include "Gladiator" nameplates on the front driver and officer side doors.
IGNITION
A master battery system with a keyless start ignition system shall be provided. There shall be a three-position rocker switch with off, battery, and ignition positions as well as a stainless-steel etched engine start push-button. The engine start button shall include an illuminated LED halo ring. Both switches shall be mounted to the left of the steering wheel on the dash.
The engine start switch shall only operate when the master battery and ignition switch is in the "ignition" position.
BATTERY
The single start electrical system shall include six (6) Harris BCI 31 930 CCA batteries with a 210 minute reserve capacity and 4/0 welding type dual path starter cables per SAE J541.
The batteries shall be held in place by non-conducting phenolic resin hold down boards.
9.a
Packet Pg. 312 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
BATTERY TRAY
The batteries shall be installed within two (2) steel battery trays located on the left side and right side of the chassis, securely bolted to the frame rails. The battery trays shall be coated with the same material as the frame.
The battery trays shall include drain holes in the bottom for sufficient drainage of water. A durable, non-conducting, interlocking mat made by Dri-Dek shall be installed in the bottom of the trays to allow for air flow and help prevent moisture build up.
BATTERY BOX COVER
Each battery box shall include a steel cover which protects the top of the batteries. Each cover shall include flush latches which shall keep the cover secure as well as a black powder coated handle for convenience when opening.
BATTERY CABLE
The starting system shall include cables which shall be protected by 275 degree F. minimum high temperature flame retardant loom, sealed at the ends with heat shrink and sealant.
BATTERY JUMPER STUD
The starting system shall include battery jumper studs. These studs shall be located in the forward most portion of the driver's side lower step, 8.00 inches apart. The studs shall allow the vehicle to be jump started, charged, or the cab to be raised in an emergency in the event of battery failure.
ALTERNATOR
The alternator shall be Leece Neville Model BLP4004H, 350 amp, serpentine belt driven unit.
The installation shall include an integral, self-diagnostic regulator and rectifier for compact installation.
STARTER MOTOR
The single start electrical system shall include a Delco brand starter motor.
BATTERY CONDITIONER
A Kussmaul Auto Charge Chief 4012 battery conditioner shall be supplied. The battery conditioner shall provide a circuit protected 40-amp output for the chassis batteries and a 20-amp output circuit for accessory loads. The conditioner shall also include a battery temperature sensor.
BATTERY CONDITIONER LOCATION
The battery conditioner shall be mounted in the cab on top of the left-hand mid EMS compartment.
BATTERY CONDITIONER DISPLAY
A Kussmaul Chief Remote Control Panel (RCP) battery conditioner display shall be supplied.
BATTERY CONDITIONER DISPLAY LOCATION
The battery conditioner display shall be mounted in the left side front step on the vertical area above the intermediate step towards the rear of the step well.
ELECTRICAL INLET LOCATION
9.a
Packet Pg. 313 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) An electrical inlet shall be installed on the left hand side of the cab ahead of the front door in the mid position.
ELECTRICAL INLET
A Kussmaul 20 amp super auto-eject electrical receptacle shall be supplied. It shall automatically eject the plug when the starter button is depressed.
A single item or an addition of multiple items must not exceed the rating of the electric inlet that its connected to.
Amp Draw Reference List:
Kussmaul 40 LPC Charger - 5 Amps
Kussmaul Chief 4012 Charger 5.7 Amps
Kussmaul 80 LPC Charger - 13 Amps
Kussmaul Chief 6012 Charger - 9 Amps
Blue Sea P12 7532 - 7.5 Amps
Iota DLS-45/IQ4 - 11 Amps
1000W Engine Heater - 8.33 Amps
1500W Engine Heater - 12.5 Amps
120V Air Compressor - 4.2 Amps
120V Dometic HVAC - 15 Amps
ELECTRICAL INLET CONNECTION
The electrical inlet shall be connected to the battery conditioner.
ELECTRICAL INLET COLOR
The electrical inlet connection shall include a black cover.
HEADLIGHTS
The cab front shall include two (2) FireTech rectangular LED headlamps with high/low beam in the same housing and two (2) separate FireTech LED high beam only headlamps mounted in bright chrome bezels.
HEADLIGHT LOCATION
The headlights shall be located on the front fascia of the cab directly below the front warning lights.
FRONT TURN SIGNALS
The front fascia shall include two (2) Whelen model M6 4.00 inch X 6.00 inch amber LED with clear lens turn signals which shall be installed in a black radius mount housing above and outboard of the front warning and head lamps.
SIDE TURN/MARKER LIGHTS
The sides of the cab shall include two (2) Tecniq S170 LED side marker lights which shall be provided just behind the front cab radius corners. The lights shall be amber with clear lenses and black bezels.
MARKER AND ICC LIGHTS
In accordance with FMVSS, there shall be five (5) Tecniq S170 LED cab marker lamps designating
9.a
Packet Pg. 314 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) identification, center and clearance provided. These lights shall be installed on the face of the cab within full view of other vehicles from ground level. The lights shall be clear lenses with black bezels.
HEADLIGHT AND MARKER LIGHT ACTIVATION
The headlights and marker lights shall be controlled via a virtual button on the vehicle display and control screen. There shall be a virtual dimmer control on the vehicle display and control screen to adjust the brightness of the dash lights. The headlamps and markers lamps shall illuminate to 100% brilliance when the ignition switch is in the "On" position. The headlamps shall be equipped with an LED halo parking light around the perimeter of each lamp that shall activate with marker lights "on".
INTERIOR OVERHEAD LIGHTS
The cab shall include a Whelen 60CREGCS LED dome lamp located over each door. The dome lamps shall be circular in shape and shall measure approximately 6.00 inches in diameter. The lights shall include push buttons on each lamp to activate both the clear and red portions of the light individually.
INTERIOR OVERHEAD LIGHTS ACTIVATION
The clear portion of each lamp shall be activated by opening the respective door and via the vehicle display and control screen.
LIGHTBAR PROVISION
There shall be two (2) light bars installed on the cab roof. The light bars shall be provided and installed by the chassis manufacturer. The light bar installation shall include mounting and wiring to a control switch on the cab dash.
CAB FRONT LIGHTBAR MODEL
The cab shall be provided with two (2) Whelen model F4NMINI light bars. Each light bar shall be 21.50 inches in length and feature eight (8) customizable pods.
See the light bar layout for specific details.
If applicable, clear lights shall be disabled with park brake engaged.
LIGHTBAR SWITCH
The light bar shall be controlled by a virtual button on the vehicle display and control screen. This button shall be clearly labeled for identification.
FRONT SCENE LIGHTS
The front of the cab shall include two (2) Whelen Pioneer model PFH1 contour roof mount scene lights installed on the brow of the cab.
Each 75 watt lamp head shall incorporate a 12 volt DC Super-LED flood light installed in a die-cast aluminum housing. Each lamp head shall use a collimator/metalized redux flood reflector assembly with Proclera silicone optics and a clear non-optic polycarbonate lens. The lens/reflector assembly shall utilize a liquid injected molded silicone gasket to be resistant to water, moisture, dust, and other environmental conditions. The PFH1 shall be vibration resistant. The Pioneer PC boards shall be conformal coated for additional protection. Each combination flood light lamp head shall draw 13.0 amps in spotlight mode and generate 8,875 lumens total. Each lamp head shall measure 4.25 inches in height X 8.35 inches in width. The lamp heads and brackets shall be powder coated black.
FRONT SCENE LIGHT LOCATION
9.a
Packet Pg. 315 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) There shall be two (2) scene lights mounted to the front brow of the cab in the outboard position.
FRONT SCENE LIGHTS ACTIVATION
The front scene lighting shall be activated by a virtual button on the vehicle display and control screen and a lighted momentary rocker switch on the dash.
SIDE SCENE LIGHTS
The cab shall include two (2) Whelen Pioneer model PCPSM1B LED surface mount lights installed one (1) on each side of the cab.
The PCPSM1B configuration shall consist of twelve (12) white Super-LEDs for the spot light with a specialized spot reflector on the bottom, twenty-four (24) white Super-LEDs in the flood light with a clear optic collimator/metalized reflector assembly on the top, and a clear non-optic polycarbonate lens.
Each lamp head shall draw 6.0 amps and generate 7,800 lumens. Each lamp head housing shall be painted black.
SIDE SCENE LIGHT LOCATION
The scene lighting located on the left and right sides of the cab shall be mounted in the upper forward portion of the cab between the front and rear crew doors.
SIDE SCENE ACTIVATION
The scene lights shall be activated by two (2) lighted momentary rocker switches located in the switch panel, one (1) for each light, by two (2) virtual buttons on the vehicle display and control screen(s), one (1) for each light, and by opening the respective side cab doors.
REAR SCENE LIGHTS
The vehicle shall include multiplex activated rear scene lighting for body builder installed scene lights and body builder installed multiplex output.
REAR SCENE LIGHT ACTIVATION
The rear scene lighting shall be activated via a virtual button on the vehicle display and control screen.
GROUND LIGHTS
Each door shall include a Tecniq T44 LED ground light mounted to the underside of the cab step below each door. The lights shall include a polycarbonate lens, a housing which is vibration welded and LEDs which shall be shock mounted for extended life.
GROUND LIGHTS
The ground lighting shall be activated when the parking brake is set, by the opening of the door on the respective cab side, and through a virtual button on the vehicle display and control screen.
UNDER BUMPER LIGHTS
There shall be two (2) 4.00 inch round LED NFPA compliant ground lights mounted under the bumper. The lights shall include a polycarbonate lens, a housing which is vibration welded, and LEDs which shall be shock mounted for extended life. The under bumper ground lighting shall be interlocked with the park brake and the marker light activation.
LOWER CAB STEP LIGHTS
9.a
Packet Pg. 316 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The middle step located at each door shall include a Tecniq T44 LED light which shall activate with the opening of the respective door. The lights shall include a polycarbonate lens, a housing which is vibration welded and LEDs which shall be shock mounted for extended life.
INTERMEDIATE STEP LIGHTS
The intermediate step well area at each door shall include a TecNiq D06 LED light within a chrome housing. The egress step lights shall provide visibility to the step well area for the first step exiting the vehicle. The egress step lights shall activate with entry step lighting.
ENGINE COMPARTMENT LIGHT
There shall be a LED NFPA compliant light mounted under the engine tunnel for area work lighting on the engine. The light shall activate automatically when the cab is tilted.
DO NOT MOVE APPARATUS LIGHT
The front headliner of the cab shall include a flashing red TecNiq K50 LED light clearly labeled "Do Not Move Apparatus". In addition to the flashing red light, an audible alarm shall be included which shall sound while the light is activated.
The flashing red light shall be located centered left to right for greatest visibility.
The light and alarm shall be interlocked for activation when either a cab door is not firmly closed, or an apparatus compartment door is not closed, and the parking brake is released.
MASTER WARNING SWITCH
A master switch shall be included, as a virtual button on the vehicle display and control screen which shall be labeled "E Master" for identification. The button shall feature control over all devices wired through it. Any warning device switches left in the "ON" position when the master switch is activated shall automatically power up. There shall be an additional virtual button on the vehicle display and control screen to manually override an automatic warning light dimmer clearly labeled "WARNING LIGHT DIMMER". The warning light dimmer will automatically reduce the brightness of the warning lights with the display screen "Night" dimmer setting and with the park brake set. The operator can override the warning light dimmer feature and manually select the warning lights to be at normal brightness using the warning light dimmer virtual button, or "Day" display screen brightness. The lights shall also default to normal brightness when the "E Master" button is activated, and the park brake is released.
HEADLIGHT FLASHER
An alternating high beam headlight flashing system shall be installed into the high beam headlight circuit which shall allow the high beams to flash alternately from left to right.
Deliberate operator selection of high beams will override the flashing function until low beams are again selected. Per NFPA, these clear flashing lights will also be disabled "On Scene" when the park brake is applied.
HEADLIGHT FLASHER SWITCH
The flashing headlights shall be activated through a virtual button on the Vista display and control screen.
9.a
Packet Pg. 317 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
INBOARD FRONT WARNING LIGHTS
The cab front fascia shall include two (2) Whelen M6 Super LED front warning lights in the left and right inboard positions. The lights shall feature multiple flash patterns including steady burn. The lights shall be mounted to the front fascia of the cab within a black bezel. The warning lights shall be set to emit the "TripleFlash 75" in/out flash pattern.
INBOARD FRONT WARNING LIGHTS COLOR
The warning lights mounted on the cab front fascia in the inboard positions shall be red with a clear lens.
OUTBOARD FRONT WARNING LIGHTS
The cab front fascia shall include two (2) Whelen M6 Super LED front warning lights in the left and right outboard positions. The lights shall feature multiple flash patterns including steady burn. The lights shall be mounted to the front fascia of the cab within a bezel. The warning lights shall be programmed to emit the "TripleFlash 75" in/out flash pattern. The headlight bucket adapter kit shall include a black polycarbonate flange.
OUTBOARD FRONT WARNING LIGHTS COLOR
The warning lights mounted on the cab front fascia in the outboard position shall be red with a clear lens.
BUMPER FACE WARNING LIGHT
The front bumper face shall include two (2) Whelen M6 series 4.31 inches tall X 6.75 inches wide Super LED® warning lights. The warning lights shall feature multiple flash patterns including steady burn. The lights shall be surface mounted within a chrome bezel. The warning lights shall be set to flash "TripleFlash 75" in/out flash pattern. The lights shall be surface mounted within a black bezel.
BUMPER FACE WARNING LIGHT COLOR
The warning lights in the bumper shall be red with clear lenses.
BUMPER FACE WARNING LIGHT LOCATION
The front bumper face warning lights shall be located between the frame rails in the right and left side outboard positions.
FRONT WARNING SWITCH
The front warning lights shall be controlled through a virtual control on the vehicle display and control screen. This switch shall be clearly labeled for identification.
INTERSECTION WARNING LIGHTS
The chassis shall include two (2) Whelen M6 series Super LED intersection warning lights, one (1) each side. The lights shall feature multiple flash patterns including steady burn. The lights shall be set to flash "TripleFlash 75" I/O flash pattern. The lights shall be mounted within a black bezel.
INTERSECTION WARNING LIGHTS COLOR
The intersection lights shall be red with a clear lens.
INTERSECTION WARNING LIGHTS LOCATION
9.a
Packet Pg. 318 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The intersection lights shall be mounted centered front to rear on the flat portion of the side of the bumper tail.
SIDE WARNING LIGHTS
The cab sides shall include two (2) Whelen M6 Super LED warning lights, one (1) on each side. The lights shall feature multiple flash patterns including steady burn for solid colors and multiple flash patterns for split colors. The lights shall be mounted to the sides of the cab within a black bezel. The light shall be programmed to emit the "TripleFlash 75" in/out flash pattern.
SIDE WARNING LIGHTS COLOR
The warning lights located on the side of the cab shall be red with clear lens.
SIDE WARNING LIGHTS LOCATION
The warning lights on the side of the cab shall be mounted over the front wheel well forward from the center of the front axle.
SIDE AND INTERSECTION WARNING SWITCH
The side warning lights shall be controlled through a virtual button on the vehicle display and control screen. This button shall be clearly labeled for identification.
TANK LEVEL LIGHTS
There shall be two (2) FRC MaxVision surface mount water level light strips.
The light strips shall feature four (4) colors of LED lights to indicate the fluid level of a tank. The colors from top to bottom shall be green, blue, amber, and red.
TANK LEVEL LIGHTS ACTIVATION
The tank level lights shall be pre-wired and coiled at rear of the cab for connection to the apparatus by the body builder.
TANK LEVEL LIGHTS LOCATION
There shall be water level lights mounted on each side of the cab, centered between the rear cab doors and the rear corners of the cab.
REAR WARNING LIGHTS
The cab shall include a Whelen TAL65 Traffic Advisor Kit provided by Spartan. The kit shall include the Traffic Advisor with the standard fifteen (15) feet of cable and a Whelen TACTL5 Traffic Advisor control head.
The Whelen TACTL5 Traffic Advisor control head shall be installed and wired in the header above the driver. The control head shall be mounted in the drivers side header inboard of the radio position.
The power to the control head shall be ignition switched and activation dependent upon the state of the controllers switched position upon ignition.
Wiring provisions shall be provided and routed to the rear of the frame for the Whelen traffic advisor which shall be shipped loose for OEM installation.
INTERIOR DOOR OPEN WARNING LIGHTS
9.a
Packet Pg. 319 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The interior of each door shall include one (1) 15.87 inch long X 0.73 inch tall amber Weldon LED warning light. The light shall be located on the upper portion of the door frame to be visible when a person is standing in front of the door while entering or exiting the cab. Each light shall activate with a scrolling directional flash pattern which moves from inside to outside when the door is in the open position. This shall serve as a warning to oncoming traffic.
SIREN CONTROL HEAD
A Whelen 295HFSC9 electronic siren control head shall be provided. The siren head shall feature a 200-watt output, wail, yelp, manual siren, and hands free operation which shall allow the operator to turn the siren on and off from the horn ring if a horn/siren selector switch option is also selected. The siren shall be installed in the switch panel with a location specific to the customers needs.
STEERING WHEEL HORN BUTTON SELECTOR SWITCH
A virtual button on the vehicle display and control screen shall be provided to allow control of the electric horn or the air horn from the steering wheel horn button. The horn button selection shall default to the air horn each time the display screen power is cycled off and on.
AUDIBLE WARNING LH FOOT SWITCH
A foot switch wired to actuate the mechanical siren(s) shall be supplied for installation in the front section of the cab for driver actuation.
MECHANICAL SIREN FOOT SWITCH LH
The mechanical siren foot switch shall be a Linemaster model 491-S.
MECHANICAL SIREN FOOT SWITCH LH LOCATION
The mechanical siren foot switch shall be located on the left hand side accessible to the driver between the steering column and the door.
MECHANICAL SIREN FOOT SWITCH LH POSITION
The mechanical siren foot switch shall be positioned outboard of any other foot switch, if applicable.
AUDIBLE WARNING LH FOOT SWITCH BRACKET
A 30.00 degree angled foot switch bracket, wide enough to accommodate (2) foot switches, shall be installed outboard of the steering column for specified driver accessible foot switch activations.
AIR HORN AUXILIARY ACTIVATION
The air horn activation shall be accomplished by a momentary rocker switch on the switch panel.
MECHANICAL SIREN BRAKE/AUXILIARY ACTIVATION
The mechanical siren shall be actuated by a momentary rocker switch in the switch panel on the dash. A red momentary siren brake rocker switch shall be provided in the switch panel on the dash. A virtual button for the siren brake shall be provided on the vehicle display and control screen.
MECHANICAL SIREN INTERLOCK
The siren shall only be active when master warning switch is on to prevent accidental engagement.
BACK-UP ALARM
An ECCO model 575 backup alarm shall be installed at the rear of the chassis with an output level of 107 dB. The alarm shall automatically activate when the transmission is placed in reverse.
9.a
Packet Pg. 320 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
INSTRUMENTATION
An ergonomically designed instrument panel shall be provided. Each gauge shall be backlit with LED lamps. Stepper motor movements shall drive all gauges. The instrumentation system shall be multiplexed and shall receive ABS, engine, and transmission information over the J1939 data bus to reduce redundant sensors and wiring.
A twenty eight (28) icon lightbar message center with integral LCD odometer/trip odometer shall be included. The odometer shall display up to 999,999.9 miles. The trip odometer shall display 9,999.9 miles. The LCD message center screen shall be capable of custom configuration by the users for displaying certain vehicle status and diagnostic functions.
The instrument panel shall contain the following gauges:
One (1) three-movement gauge displaying vehicle speed, fuel level, and Diesel Exhaust Fluid (DEF) level. The primary scale on the speedometer shall read from 0 to 100 MPH, and the secondary scale on the speedometer shall read from 0 to 160 KM/H. The scale on the fuel and DEF level gauges shall read from empty to full as a fraction of full tank capacity. Red indicator lights in the gauge and an audible alarm shall indicate low fuel or low DEF at 1/8th tank level.
One (1) three-movement gauge displaying engine RPM, and primary and secondary air system pressures shall be included. The scale on the tachometer shall read from 0 to 3000 RPM. The scale on the air pressure gauges shall read from 0 to 150 pounds per square inch (PSI) with a red line zone indicating critical levels of air pressure. Red indicator lights in the gauge and an audible alarm shall indicate low air pressure.
One (1) four-movement gauge displaying engine oil pressure, coolant temperature, voltmeter, and transmission temperature shall be included. The scale on the engine oil pressure gauge shall read from 0 to 100 pounds PSI with a red line zone indicating critical levels of oil pressure. A red indicator light in the gauge and audible alarm shall indicate low engine oil pressure. The scale on the coolant temperature gauge shall read from 100 to 250 degrees Fahrenheit (°F) with a red line zone indicating critical coolant temperatures. A red indicator light in the gauge and audible alarm shall indicate high coolant temperature. The scale on the voltmeter shall read from 9 to 18 volts with a red line zone indicating critical levels of battery voltage. A red indicator light in the gauge and an audible alarm shall indicate high or low system voltage. The low voltage alarm shall indicate when the system voltage has dropped below 11.8 volts for more than 120 seconds in accordance with the requirements of NFPA 1901. The scale on the transmission temperature gauge shall read from 100 to 300 degrees °F with a red line zone indicating critical temperatures. A red indicator light in the gauge and an audible alarm shall indicate a high transmission temperature.
The light bar portion of the message center shall include twenty-eight (28) LED backlit indicators. The lightbar shall be split with fourteen (14) indicators on each side of the LCD message screen. The lightbar shall contain the following indicators and produce the following audible alarms when supplied in conjunction with applicable configurations:
RED INDICATORS
Stop Engine - indicates critical engine fault
9.a
Packet Pg. 321 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Air Filter Restricted - indicates excessive engine air intake restriction Park Brake - indicates parking brake is set
Seat Belt - indicates a seat is occupied and corresponding seat belt remains unfastened Low Coolant - indicates critically low engine coolant
Cab Tilt Lock - indicates the cab tilt system locks are not engaged.
AMBER INDICATORS
Malfunction Indicator Lamp (MIL) - indicates an engine emission control system fault Check Engine - indicates engine fault
Check Transmission - indicates transmission fault
Anti-Lock Brake System (ABS) - indicates anti-lock brake system fault High exhaust system temperature indicates elevated exhaust temperatures Water in Fuel - indicates presence of water in fuel filter Wait to Start - indicates active engine air preheat cycle Windshield Washer Fluid indicates washer fluid is low DPF restriction - indicates a restriction of the diesel particulate filter Regen Inhibit-indicates regeneration of the DPF has been inhibited by the operator Range Inhibit - indicates a transmission operation is prevented and requested shift request may not occur.
SRS - indicates a problem in the supplemental restraint system Check Message - indicates a vehicle status or diagnostic message on the LCD display requiring attention.
GREEN INDICATORS
Left and Right turn signal indicators
ATC - indicates low wheel traction for automatic traction control equipped vehicles, also indicates mud/snow mode is active for ATC system
High Idle - indicates engine high idle is active.
Cruise Control - indicates cruise control is enabled
OK to Pump - indicates the pump is engaged and conditions have been met for pump operations Pump Engaged - indicates the pump transmission is currently in pump gear Auxiliary Brake - indicates secondary braking device is active
BLUE INDICATORS
High Beam indicator
AUDIBLE ALARMS
Air Filter Restriction
Cab Tilt Lock
Check Engine
Check Transmission
Open Door/Compartment
High Coolant Temperature
High or Low System Voltage
High Transmission Temperature
Low Air Pressure
Low Coolant Level
Low DEF Level
Low Engine Oil Pressure
9.a
Packet Pg. 322 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Low Fuel
Seatbelt Indicator
Stop Engine
Water in Fuel
Extended Left/Right Turn Signal On
ABS System Fault
BACKLIGHTING COLOR
The instrumentation gauges and the switch panel legends shall be backlit using white LED backlighting.
RADIO
A Jensen brand heavy-duty radio with weather band, AM/FM stereo receiver and Bluetooth capabilities shall be installed in a customer specified location. Radio shall be the current, commercially available heavy-duty single-DIN automotive model at time of vehicle manufacturing date.
RADIO LOCATION
The radio shall be installed in the left hand overhead position above the driver.
AM/FM ANTENNA
A small antenna shall be located on the left hand side of the cab roof for AM/FM and weather band reception.
RADIO SPEAKERS
There shall be two (2) speakers installed in the front portion of the cab recessed overhead and two (2) speakers installed in the rear portion of the cab overhead. The speakers shall be provided for connection to the sound system.
CAMERA RIGHT HAND
One (1) Audiovox Voyager heavy duty rearview teardrop shaped chrome plated housing camera shall be mounted on the officer side of the cab below the windshield ahead of the front door at approximately the same level as the cab door handles. The camera display shall activate when the right side turn signal is activated.
CAMERA REAR
One (1) Audiovox Voyager heavy duty box shaped HD camera shall be shipped loose for OEM installation in the body to afford the driver a clear view to the rear of the vehicle.
The rear camera display shall activate when the vehicles transmission is placed in reverse.
CAMERA DISPLAY
The camera system shall be wired to a single vehicle display and control screen located on the drivers side dash. The camera system display can be activated through the vehicle display and control screen.
COMMUNICATION ANTENNA
An antenna base, for use with an NMO type antenna, shall be mounted on the right hand front corner of the cab roof so not to interfere with light bars or other roof mounted equipment installed by chassis builder. The antenna base shall be an Antenex model MABVT8 made for either a 0.38 inch or 0.75 inch receiving hole in the antenna and shall include 17.00 foot of RG58 A/U cable with no connector at the radio end of the cable. The antenna base design provides the most corrosion resistance and best power
9.a
Packet Pg. 323 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) transfer available from a high temper all brass construction and gold plated contact design. The antenna base shall be chassis builder supplied.
COMMUNICATION ANTENNA CABLE ROUTING
The antenna cable shall be routed from the antenna base mounted on the roof to the area inside the center rocker switch console.
AUXILIARY COMMUNICATION ANTENNA
An auxiliary antenna base, for use with an NMO type antenna, shall be installed on the cab. The antenna base shall be an Antenex model MABVT8 and shall include 17.00 foot of RG58 A/U cable with no connector at the radio end of the cable. The antenna shall be mounted on the left hand front corner of the cab roof so not to interfere with light bars or other roof mounted equipment installed by chassis builder.
The antenna base shall be chassis builder supplied.
AUXILIARY COMMUNICATION ANTENNA CABLE ROUTING
The auxiliary antenna cable shall be routed from the antenna base mounted on the roof to the area behind and underneath the right hand front seat.
TWO-WAY RADIOS
A cutout shall be provided in the cab in the right hand overhead position for installation of a Firecom model 5100D radio. No wiring provision shall be provided.
A radio wire conduit with a pull wire included shall be installed and routed from behind the dash to under the officers seat for radio installation by the customer. The officers under seat storage area shall include an access hole for the conduit cut into the rear face of the seat box. The hole shall be approximately 1.00 inch from the bottom and 1.00 from the inner wall of the seat box.
There shall be flexible grey 1.50 inch diameter PVC wiring conduit with a pull wire installed and routed from the center dash and shall terminate at the left side just behind the rear wall of the cab with a twenty-five foot coil for installation by the OEM to the apparatus. The conduit shall have a straight fitting on each end.
FIRE EXTINGUISHER
A 2.50 pound D.O.T approved fire extinguisher with BC rating shall be shipped loose with the cab.
ROAD SAFETY KIT
The cab and chassis shall include one (1) emergency road safety triangle kit.
DOOR KEYS
The cab and chassis shall include a total of four (4) door keys for the manual door locks.
CHASSIS OPERATION MANUAL
The chassis operation manual shall be contained in an on board USB digital storage device. The chassis operation manual shall be accessible through a USB port provided in the OBD diagnostic panel.
ENGINE AND TRANSMISSION OPERATION MANUALS
The following manuals specific to the engine and transmission models ordered will be included with the chassis in the ship loose items:
9.a
Packet Pg. 324 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) (1) Hard copy of the Engine Operation and Maintenance manual with digital copy (1) Digital copy of the Transmission Operators manual
(1) Digital copy of the Engine Owners manual
CAB/CHASSIS AS BUILT WIRING DIAGRAMS
The cab and chassis wiring schematics and option wiring diagrams shall be contained in an on board USB digital storage device. The cab and chassis wiring schematics and option wiring diagrams shall be accessible through a USB port provided in the OBD diagnostic panel.
SALES TERMS
The sale of the chassis shall be governed by the terms contained on the Sales Terms Acceptance of Purchase Order document, a copy of which is attached to this option.
9.a
Packet Pg. 325 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Quote #: 0026241 Page 1 of 12
Quote Summary with Notes
Customer: Dealership: Fire Apparatus Solutions
1762 S Sycamore Ave
Quote No: 0026241 Quote Name: Test S180
S.O.#: Unit Type:
Option ID Description
General Info General Info Section
950012 S180 107' Rear Mount Aerial Ladder
100972 Spartan Branded Badging and Logo's
900998
901160 Engine Availability
911059 Bidding Prerequisites, United States
911060 Standards Version, NFPA
911064
911070 Documentation, NFPA
980016 Owner's Manuals, Electronic, (1) USB Drive
901037 Aerial Operations/Parts/Maintenance Manuals, (1) Printed Copy, (1) USB Drive
121744 Aerial Demonstration, Aerial Ladder, (3) Consecutive Days 911081 Misc. Equipment Allowance, 2,500 Lb.
901080 Tilt Table Test, Not Required, Chassis ESC
980012
911066
911304 Apparatus Production Photos
901230 No Preconstruction Meeting
911074 Final Inspection, OEM Factory, Required
900491 Overall Height, 143" (11'-11")
900242 Overall Length, 487" (40'-7")
900581 Wheelbase, 233 (19'-5")
900653 Angle of Approach, 8 Degrees
900674 Angle of Departure, 8 Degrees
Chassis Chassis Section
910013 Custom Chassis, Spartan, Gladiator
910020 Axles, Tandem
001360 OEM Chassis Preparations, Spartan Metro Star/Gladiator 008377 Exhaust Mitigation Device, Chassis Supplied, OEM Installed 102114 Air Line System, Brass Compression Fittings w/SST Inserts 001200 Mud Flaps, Front Chassis Provided, Rear OEM Provided
9.a
Packet Pg. 326 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Quote #: 0026241 Page 2 of 12
Option ID Description
910021 Cab Electrical, Multiplex
100964 Relocate Cab Tilt Pendant, Standard Location
910156 Front Bumper, Chassis Supplied and Installed
901220 No Front Storage Well Flooring
911284 Battery Charger, Chassis Supplied and Installed
000366 Door Open Warning Circuit, Wired to Light in Cab Water/Foam Tanks Water/Foam Tanks Section
121508 Water Tank, UPF, 480 U.S. Gallons
008185 Water Tank Mounting, UPF, Non 77' Rear Mount Aerials 002230 Water Tank Drain, 1-1/2" Valve, Aerials
910160 Water Tank Fill Tower, UPF, Black
003109 Water Tank Level Gauge, FRC Tankvision Pro 300 (WLA300-A00), Pump Operator's Panel
100445 Water Tank Level Display, Chassis Supplied FRC MaxVision, Cab Sides, OEM Datalink Connection
000348
000251 Foam Cell, UPF, 20 U.S. Gallon
910172 Foam Cell Type, Class A
910169 Foam Cell Fill Tower, UPF, Black
Hose Bed Hose Bed Section
102606
Finish, (1) Chute, Painted Door
910182 Hose Bed Capacity, 30 ft³
901161 Top / End Covers, Dealer/Customer Supplied And Installed 102541 Hose Bed Loading Lights, (2), LED, Spartan/Smeal Tube Lights W/Housing
Body / Pump Module Body / Pump Module
002647 Body, 100" Wide, Rear Mount Aerial, Tandem-Axle, Aluminum, 1/8" (77'/UT 100'/107')
121763 Side Compartment Doors, Roll-Up Doors, ROM, Painted Doors and Trim
120863 Side Compartment Doors, Roll-Up Doors, ROM, Painted Doors and Trim (8)
120874 Compartment Door Handles, All Non-Locking
100869 Vendor Supplied Pull Down Straps, (8) Roll-up Doors 010185 Rear Compartment Door, (1), Painted Lap Door, Non-Locking D-Ring Latch
901195 Inner Door Face, (1) Rear Door, Painted Main Body Color 102360 Compartment Lighting, LED Tube Lights, Spartan/Smeal, (16) 000934 Compartment Finish, Bedliner Coating, Gray
102847 Flooring, Black Turtle Tiles, All Interior Body Compartment Floors Only 000474 Air Release and Drain Holes, All Compartments
007565 Sill Protector, Stainless Steel, Lap Door
010216 Fuel Fill, OEM Painted Door, Driver's Side
901150 Wheel Well Storage Design, Tandem Axle, Standard 121546 Driver's (Left) Side Body, Mid-Size RMA, Tandem Axle, L1 Full, L2 Upper, L3 Upper, L4 Full
9.a
Packet Pg. 327 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Quote #: 0026241 Page 3 of 12
Option ID Description
L1 L1 Components
Height Height - 58"
Width Width - 25"
Upper Depth Upper Depth - 14"
Lower Depth Lower Depth - 23"
Divide Height Intermediate Divide Height - 30"
002740 Shelf (1), Adjustable, Aluminum, Shallow Depth (2 Struts), Abraded 002499 Tray (1), Floor-Mounted Roll Out, Austin Hardware, 300#, 100% Extension, Abraded, With Front Drawer Release
120785 Compartment Struts, Vertical, Welded Aluminum
L2 L2 Components
Height Height - 24"
Width Width - 78"
Upper Depth Upper Depth - 14"
Lower Depth Lower Depth - 14"
Divide Height Intermediate Divide Height - 0"
002740 Shelf (1), Adjustable, Aluminum, Shallow Depth (2 Struts), Abraded 120785 Compartment Struts, Vertical, Welded Aluminum
L3 L3 Components
Height Height - 16"
Width Width - 51"
Upper Depth Upper Depth - 14"
Lower Depth Lower Depth - 14"
Divide Height Intermediate Divide Height - 0"
002740 Shelf (1), Adjustable, Aluminum, Shallow Depth (2 Struts), Abraded 120785 Compartment Struts, Vertical, Welded Aluminum
L4 L4 Components
Height Height - 47"
Width Width - 26"
Upper Depth Upper Depth - 14"
Lower Depth Lower Depth - 23"
Divide Height Intermediate Divide Height - 25"
002740 Shelf (1), Adjustable, Aluminum, Shallow Depth (2 Struts), Abraded 002742 Shelf (1), Adjustable, Aluminum, Full Depth (4 Struts), Abraded 002499 Tray (1), Floor-Mounted Roll Out, Austin Hardware, 300#, 100% Extension, Abraded, With Front Drawer Release
120785 Compartment Struts, Vertical, Welded Aluminum
009394 WL1, Air Bottle Compartment, OEM Painted SS Door, Single 009405 WL2, Air Bottle Compartments, OEM Painted SS Doors, Two (2) Back-to-Back Single 009422 WL3, Extinguisher/Water Can Compartment, OEM Painted SS Door, Single (Up to 9" Diameter)
121584
R2 Upper, R3 Upper, R4 Full
R1 R1 Components
Height Height - 58"
9.a
Packet Pg. 328 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Quote #: 0026241 Page 4 of 12
Option ID Description
Width Width - 25"
Upper Depth Upper Depth - 14"
Lower Depth Lower Depth - 0"
Divide Height Intermediate Divide Height - 30"
002740 Shelf (1), Adjustable, Aluminum, Shallow Depth (2 Struts), Abraded 002499 Tray (1), Floor-Mounted Roll Out, Austin Hardware, 300#, 100% Extension, Abraded, With Front Drawer Release
120785 Compartment Struts, Vertical, Welded Aluminum
R2 R2 Components
Height Height - 24"
Width Width - 78"
Upper Depth Upper Depth - 14"
Lower Depth Lower Depth - 14"
Divide Height Intermediate Divide Height - 0"
002740 Shelf (1), Adjustable, Aluminum, Shallow Depth (2 Struts), Abraded 120785 Compartment Struts, Vertical, Welded Aluminum
R3 R3 Components
Height Height - 16"
Width Width - 51"
Upper Depth Upper Depth - 14"
Lower Depth Lower Depth - 14"
Divide Height Intermediate Divide Height - 0"
002740 Shelf (1), Adjustable, Aluminum, Shallow Depth (2 Struts), Abraded 120785 Compartment Struts, Vertical, Welded Aluminum
R4 R4 Components
Height Height - 47"
Width Width - 48"
Upper Depth Upper Depth - 14"
Lower Depth Lower Depth - 23"
Divide Height Intermediate Divide Height - 25"
002740 Shelf (1), Adjustable, Aluminum, Shallow Depth (2 Struts), Abraded 002499 Tray (1), Floor-Mounted Roll Out, Austin Hardware, 300#, 100% Extension, Abraded, With Front Drawer Release
120785 Compartment Struts, Vertical, Welded Aluminum
009433 WR1, Air Bottle Compartment, OEM Painted SS Door, Single 8" 009444 WR2, Air Bottle Compartments, OEM Painted SS Doors, Two (2) Back-to-Back Single 8" 009461 WR3, Extinguisher/Water Can Compartment, OEM Painted SS Door, Single (Up to 9" Diameter)
901045 Rear Side Body, Rear Mounts, Torque Box Compartment 008773 Sub Frame Body Mounts, GS-36, Hot-Dip Galvanized Steel, Aerial (107')
005118 Rub Rails, "C" Channel Design (No Rubber Inserts) 000516 Tow Option, Rear, Tow Eye, Two (2), Chrome
002187 Wheel Wells, Rear, Tandem Axle
003560 Fenderettes, (4), Tandem Axle, Stainless Steel
9.a
Packet Pg. 329 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Quote #: 0026241 Page 5 of 12
Option ID Description
120489
002427 License Plate Bracket
006375 Stainless Steel Screws, Aerial
911283 NO Bag of Bolts
900963 Walkways/Overlays/Stepping Surfaces, Tread Plate, NFPA 102839 Smart S180 Turntable Access Ladder, Driver's Side, On-Scene Access, 000505 Vertical Overlay, Tread Plate
100437 Front Steps and Lighting, Innovative Controls Dual LED Lighted, Folding Steps (4), Drivers Side, Spartan Logo
100438 Front Steps and Lighting, Innovative Controls Dual LED Lighted, 100874 Handrail, Body (Front), Top, Driver's Side, Hansen Backlit White, Red 100876
102841 Ladder Storage, In Torque Box, 107
102842 Ground Ladder Package, (1) 10' Attic (585-A), (1) Little Giant (15187), (2) 16' Roof (875-DR), (1) 28' Two-Section (1200-A), (1) 35' Three-Section (1225-A) 102843 Pike Pole Storage, In Torque Box, (6) Tubes
901249 Dealer Supplied and Installed Pike Poles
102844 Pike Pole Storage, Torque Box, (2) Trays
901249 Dealer Supplied and Installed Pike Poles
002648 Pump Module, Rear Mount Aerial, Independent, 1/8" Aluminum (107')
102434 Pump Compartment Internal Lighting, LED Tube Lights, Spartan/Smeal 009864 Running Board, Driver's Side, Tread Plate
111014
PAC Straps
111028 Running Board Storage Well Tile, (1), Black Turtle Tile Flooring 009861 Pull-Out Platform (1), Driver's Side Pump Module, Innovative Industries 009984 Dunnage Compartment, Above Pump Module
102845
Bedliner, Alum., Compression Latches and Handle
101691 Pump Panels, Rear Mount Aerial and Platform, Controls on Driver's Side, Black Bedliner Coating Finish, Polish SST Trim Rings, IC (Spartan Style) Bezels/Labels
102400 Pump Panel Lighting, Side Panels, LED Tube Lights, Spartan/Smeal, 003878 Pump Panel Lighting Activation, ON/OFF Switch on Pump Panel Pump / Foam
System
Pump / Foam System
100157 Pump, Waterous, Single-Stage, 2000 GPM, CSU, Flame Plated Impeller Hubs
000090 Mechanical Seals, Waterous
002792 Anodes, Waterous, Magnesium, 2 Discharge, 2 Intake 910623 Pump Rating, 1750 GPM
910640 Pump Mounting, Independent Pump Module
9.a
Packet Pg. 330 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Quote #: 0026241 Page 6 of 12
Option ID Description
101764 Pump Shift, Chassis Sup/Instl, Air, Lights Incorporated with Pres. Gov. 009530 Governor, TGA400, FRC
111113 Intake Relief Valve, Pump, TFT A1850, Factory Preset 006588 Primer, Trident, AirPrime (3-Barrel), Air-Operated Valve (31.001.7) 000112 Master Drain Valve, Trident
111100 Overheat Protection Manager (OPM), Waterous, With Lights and Buzzer
910645 Pump Color Primed Black - Intakes Unpainted
901166 Pump Manuals Waterous, (2)
102815 Pump Cooling System, 3/4” I.D., Class 1, 1/4 Turn Control on Pump Panel
100721 Foam System, FoamPro, S1600-1, Single System, Class A Foam, Flush System
003110 Foam Cell Level Gauge, FRC Tankvision Pro 300, WLA360-A00, Class A Foam
980014 Foam System Testing, Single System
006643 Manifold, Waterous, Standard, Side Mounts, Non-Foam 901208 Akron 8800/8600 - Push/Pull Discharges (Slow-Close on 3" or Larger) - Manual Intakes (Spartan Style Push/Pull Handles)
901211 Gauge Brand, Inn. Cntrls, 2-1/2" TC Series, Liquid Filled Gauge with Spartan Bezel, IC, psi 0-400
901274 Master Gauges, Not Required, Provided with Pressure Governor 101697 Test Ports, Pressure/Vacuum, Inn. Cntrls, Spartan Logo, Operators Panel
910527 Hardware Brand, South Park, NH Intake Swivels, NH Discharges, TFT Storz
101698 Drains, Innovative Controls, Manual Lift Handle (Spartan Style) 102775 Water Line Fittings, Compression Fittings
101704 Pump to Tank Fill, 2", Akron 8800 2" Manual Valve, IC (Spartan Style) Push-Pull Handle
101710 Tank to Pump, 3", Akron 8800 3" Manual Valve, IC (Spartan Style) Push-Pull Handle
Intakes Intakes
100381 Main Intake, Driver Side, 6", Short Tube, Full-Body Pump, MNST 901253 No Steamer Cap - Customer Will Sign SOE
002588 Auxiliary Intake, Driver-Side, 2-1/2", Fully Recessed 007059 Valve, 2-1/2", Akron, Manual, 8825, Stainless Ball, TS Handle 001246 Plug, NH, 2-1/2", South Park, HPC3008AC
100385
901253 No Steamer Cap - Customer Will Sign SOE
Discharges Discharges
002545 Discharge, Driver-Side, 2-1/2", NST (250 GPM NFPA Rated) 101723 Valve, 2-1/2", Akron, Manual, 8625, Stainless Ball, Innovative Controls (Spartan Style) Push Pull Controller (Rack and Sector)
101729 Pressure Gauge, Inn. Cntrls, 2-1/2" TC Series, Liquid Filled - PSI 0-400 (Spartan Logo)
9.a
Packet Pg. 331 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Quote #: 0026241 Page 7 of 12
Option ID Description
100527 Elbow (30 Deg.) 2-1/2" FNH x 2-1/2" MNH (SE393010AC) - NH Cap (HCC2808AC), Chrome, South Park
002545 Discharge, Driver-Side, 2-1/2", NST (250 GPM NFPA Rated) 101723 Valve, 2-1/2", Akron, Manual, 8625, Stainless Ball, Innovative Controls (Spartan Style) Push Pull Controller (Rack and Sector)
101729 Pressure Gauge, Inn. Cntrls, 2-1/2" TC Series, Liquid Filled - PSI 0-400 (Spartan Logo)
100527 Elbow (30 Deg.) 2-1/2" FNH x 2-1/2" MNH (SE393010AC) - NH Cap (HCC2808AC), Chrome, South Park
002538
101725 Valve, 2-1/2", Akron, Manual, 8825, Stainless Ball, Innovative Controls (Spartan Style) Push Pull Controller (Operators Panel)
101729 Pressure Gauge, Inn. Cntrls, 2-1/2" TC Series, Liquid Filled - PSI 0-400 (Spartan Logo)
100527 Elbow (30 Deg.) 2-1/2" FNH x 2-1/2" MNH (SE393010AC) - NH Cap (HCC2808AC), Chrome, South Park
002553
102575 Valve, 3", Akron, Manual, 8830, Stainless Ball, Innovative Controls Push Pull Controller (Operators Panel)
101729 Pressure Gauge, Inn. Cntrls, 2-1/2" TC Series, Liquid Filled - PSI 0-400 (Spartan Logo)
100609 Elbow (30 Deg.) 4" FNH x 4" MNH (SE393040AC) - NH Cap (HCC2814AC), Chrome, South Park
121832 Discharge, Front Bumper Driver-Side, 2-1/2", Chassis Installed Plumbing, Above Gravelshield, NST (250 GPM NFPA Rated)
910534 Foam Capable Discharge
101724 Valve, 2-1/2", Akron, Manual, 8825, Stainless Ball, Innovative Controls (Spartan Style) Push Pull Controller
101729 Pressure Gauge, Inn. Cntrls, 2-1/2" TC Series, Liquid Filled - PSI 0-400 (Spartan Logo)
910526 Preconnect Discharge
102579 Crosslays, Above Front Stabilizers, (2) 1-1/2" and (1) 2-1/2" 007013 Pre-connect Hose Bed Housing Coating, Abraded Finish 007018 Flooring, Dura-Dek
000205 Crosslay Rollers
009841 Crosslay Dividers (2), Abraded Aluminum with Handheld Cutout 901161 Top / End Covers, Dealer/Customer Supplied And Installed 901231 End Covers Dealer Supplied and Installed
102544 Crosslay Hose Bed Lights, LED, Spartan/Smeal Tube Lights 910701 Pre-connect, Crosslay/Speedlay, 1-1/2", NST
910663 Crosslay Load Capacity, 250' of 1-3/4" Hose, Single Stack 910534 Foam Capable Discharge
101719 Valve, 2", Akron, Manual, 8820, Stainless Ball, Innovative Controls (Spartan Style) Push Pull Controller
101729 Pressure Gauge, Inn. Cntrls, 2-1/2" TC Series, Liquid Filled - PSI 0-400 (Spartan Logo)
910526 Preconnect Discharge
910701 Pre-connect, Crosslay/Speedlay, 1-1/2", NST
9.a
Packet Pg. 332 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Quote #: 0026241 Page 8 of 12
Option ID Description
910663 Crosslay Load Capacity, 250' of 1-3/4" Hose, Single Stack 910534 Foam Capable Discharge
101719 Valve, 2", Akron, Manual, 8820, Stainless Ball, Innovative Controls (Spartan Style) Push Pull Controller
101729 Pressure Gauge, Inn. Cntrls, 2-1/2" TC Series, Liquid Filled - PSI 0-400 (Spartan Logo)
910526 Preconnect Discharge
910702 Pre-connect, Swivel, Crosslay/Speedlay, 2-1/2", NST 910666 Crosslay Load Capacity, 250' of 2-1/2" Hose, Single Stack 910534 Foam Capable Discharge
101724 Valve, 2-1/2", Akron, Manual, 8825, Stainless Ball, Innovative Controls (Spartan Style) Push Pull Controller
101729 Pressure Gauge, Inn. Cntrls, 2-1/2" TC Series, Liquid Filled - PSI 0-400 (Spartan Logo)
910526 Preconnect Discharge
007596 Discharge, Aerial Waterway, 4" (UT100'/107'/125') 102958 Valve, 4", Akron, Electric, 8940, Composite Ball, Navigator Controller (Valve Only)
101729 Pressure Gauge, Inn. Cntrls, 2-1/2" TC Series, Liquid Filled - PSI 0-400 (Spartan Logo)
111772 Flow Meter with Paddle Wheel, Class 1, Pump Panel Low Voltage Low Voltage
002956 Electrical System, Aerial, FRC ControlMaxx Multiplex, QL-12 Harnesses, Sealed Switches
911058 Electrical System Test, 12 Volt
102863 Tail Lights, LED, Whelen, M6 Series, Stop-Tail (Combination) (M62BTTC)/Turn (M62TC)/Backup (M62BU), 3-Light Vertical Individual Black Bezels (Clear Lenses)
002192 Switch, Rear Work Light, At Rear/Reverse
101968 Turn Signals, (2) in Rub Rail, LED, Tecniq, S170, Chrome Bezels, Steady Burn Except When Activated
101971 Ground Lights, LED, T44, Tecniq, Activation to Match Chassis Programming
101962 Clearance Lights, With Rubber Extension Arms, LED, Tecniq S170, Red, Chrome Bezels
004882 Camera System, Back-Up, Chassis Supplied, OEM Installed 000621 Alarm, Door Open Warning Circuit
911317 Upper Zone A, Chassis Supplied and Installed
102258 Warning Light Dimming Feature, Side & Rear Warning Lights 102773 Upper Zone C, Warning Lights (2), Whelen, LED, M6 Series, Red LEDs, Chrome Flange, Clear Lens
102570 Upper Zone B/D, Warning Lights (4), Whelen, LED, T-Series, Chrome Housing
102774 Lower Zone Warning Light Package, (6) OEM Sup., Whelen, LED, (2) M6 Series, (4) T-Series, Chrome Bezels, Red LEDs/Clear Lens 101263
Installed Controller
910739
9.a
Packet Pg. 333 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Quote #: 0026241 Page 9 of 12
Option ID Description
000890 Air Horn Activation, Push Button on Pump Panel, Driver's Side 102028 Scene Lights, Pair, 12V, Whelen, Surface Mount, LED Pioneer Plus (PCPSM2) Combo Spot/Flood, Chrome Flange
910852 Lighting Location, Side Face of Body, Center, Both Sides 110852 Lighting Activation, Pair, On Multiplex Display and Pump Panel, 'LEFT SCENE' and 'RIGHT SCENE'
102026 Scene Lights, Pair, 12V, Whelen, Surface Mount, LED Pioneer Plus (PCPSM1) Combo Spot/Flood, Chrome Flange
910851 Lighting Location, Rear Face of Body, Both Sides 110837 Lighting Activation, On Multiplex Display and Pump Panel, 'REAR SCENE'
Line Voltage Line Voltage
Aerial Aerial
001481 Construction and Dimensions, Rear Mount Ladder Structure (107') 911154
000001 -
001837
121500 Aerial Test, Non-Destructive Testing (NDT), Independent Third Party 901000 Aerial Test, Structural Safety Factor, Stability Factor and Testing 911156 Rung Covers
001509 Ladder Travel Support/Cradle, Light, Cradle Interlock System (UT 100'/107')
001514 Elevation System (UT 100'/107')
911166 Extension/Retraction System, Maintenance Free Sheaves (UT 100'/107')
911168 Wear Pads/Bearing Surfaces
911172 Rotation System, Bearing/Gear Box/Interlocks (UT 100'/107') 911175 Cab / Body Damage Protection Interlock System
001632
001636 Hydraulic Pump with "Thru-Drive" (77'/UT100'/107') 001640 Hydraulic System (UT 100'/107')
111765 Hydraulic Pressure Gauge, Rear Control Station, Inn. Cntrls, 2-1/2", TC Series, psi 0-5000
008358 Hydraulic Pressure Filter, 3 Micron (Ladders)
100446 Relocate the Stabilizer Hydraulic Valve
Shop Note:
***Subject to Engineering Approval***
003770 Reservoir Isolation Kit
001649 Emergency Hydraulic Pump (77'/UT100'/107')
911194 Swivel
001805 Aerial Angle Indicator, Base Section
001807 Aerial Extension Tape
001464 Aerial Tool, Manual Rotation Drive Tool
007719 Torque Box, Painted Black, PPG (107')
101991 Stabilizers, Front and Rear "H" Style, 16' Spread, Standard Stroke, NO Stabilizer Pins, Painted Covers (107')
9.a
Packet Pg. 334 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Quote #: 0026241 Page 10 of 12
Option ID Description
911178 Stabilizer Extension System (UT100'/107)
001594 Stabilizer Angle Level Gauges (2)
111754 Ground Control System, Electric Over Hydraulic Controls, Front and Rear Stabilizers, Lower Center Rear, Horizontal, Painted Stainless Door
001597 Stabilizer 1" Auxiliary Pads (4) with Racks Below Body 111740 Stabilizer Cover Warning Lights (4), Whelen, M6 Super-LED (M6RC), Red with Clear Lens, Activated with Aerial Master and Emergency Master, Bezel Color to Match Lower Zone Lights
008768 Stabilizer Arm Warning Lights (8), Whelen, 5G Series Super-LED (5GR00FRR), Red
003737 Stabilizer Work Lights (4), Truck-Lite LED (81105), Clear 008306 Turntable, Standard (107')
008346 Turntable Handrails, Knurled SS, Standard Turntable, (2) Openings 008344 Turntable Restraints, (2) ManSaver Bars
102477 Turntable Work Lights, (2) LED Tube Lights Spartan/Smeal, and (1) Truck-Lite, LED
001614 Ladder Hour Meter, At Turntable
102998 Turntable Control Console, Tread Plate Box/Painted Lid, Traditional, (3) Levers, IC Panel, Spartan LED Tube Light Under Lid (Ladders) 111973 System Lock Control, Red Mushroom Switch on Turntable Console 008024 Retraction Override Safety System, Switched at Turntable Console 001648 Load Sensing System, Loadminder Display (Ladders) 008264 Load Chart (107')
008022 Communication System, 2-Way, Turntable-Tip, FRC Always Clear Talking (ACT)
102880 Tracking Lights (2), 12V, On Front of Cradle, Whelen LED Pioneer Micro (MPPB), Black
111841 Tracking Lights Switch, Toggle Switch at Turntable Console 101960 Egress, Bolt-On, Short, Clean Tip, (Ladders)
007920 Ladder Creeper Controls at Tip, Switched at Turntable Console (107'/125')
001505 Folding Steps on Fly Section (77'/107'/125')
911157 Load Lifting/Rappelling Eyes on Fly Section
101929 12V Aerial Wiring (107')
111872 Tip Lights (2), 12V, Whelen, LED Pioneer Plus (PCH1P1) Spotlight, Switch on Lighthead, Pedestal Mount (PBAPEDD), White
911218 Tip Lights Locations, Ladder Tip, Both Sides
111881 Tip Light(s) Switch, Toggle Switch at Turntable Console 010024 Locator Light (1), 12V, Tomar, Micro IV Strobe (470S-1280-AMICRO), Amber, Activated by Aerial Master
911219 Locator Light Location, Ladder Tip, Driver's Side 911201 Waterway System (UT 100'/107')
007924 Positional Waterway, Switched at Turntable Console (77'/UT 100'/107') 001713 Waterway Relief Valve / Drain Valve
003717
007744 Bushing, 4" NST - NH Cap (HCC2814AC), Chrome, South Park
9.a
Packet Pg. 335 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Quote #: 0026241 Page 11 of 12
Option ID Description
102547 Aerial Monitor, Electric, TFT, Flex YN-EP1A-L (Ladders), TFT Controller at Turntable (YC-RP) and Tip (YC-TS)
112023 Monitor Color, TFT Silver, Powder Coat
006605 Nozzle, Electric, TFT Master Stream 1500 GPM, M-ERP1500-NN, 3-1/2" NH
911205 Monitor Sweep, Ladder, Single Monitor Above Horizontal 008648 Monitor Safety Interlock/Stow Feature, With Light 911209 Master Stream Controls, Turntable and Ladder Tip 100464 Valve Under Monitor (VUM), TFT, Manual, (1) 2-1/2" NST Left Gated Discharge, With Drain, AKM11-B181D
111925 Rung Lighting, Blue LED (UT 100'/107')
111932 Rung Lighting Switch, Toggle Switch at Turntable Console 007022 Ladder Signs (2), On Base Section
101403
to Door Ajar, (77'/107'/UT100/100' MMP)
911224 Stretcher, Dealer/Customer Supplied
111951 Solid Beam Roof Ladder Storage, Driver's Side Base Section 101063 Ladder, (1), Duo-Safety, 14' Roof, Double End, 775-DR 111965 Pike Pole Storage, Driver's Side Fly Section, 8' Pole 901249 Dealer Supplied and Installed Pike Poles
Paint / Striping /
Decals
Paint / Striping / Decals
009165 Body Paint, Single Tone, Aerial, Aluminum Material 901219 Non-Metallic Paint
101843 Body Paint Color, Aerial, Single Tone, Red, PPG
901234 Overlays, Pump Module Structure, Match Pump Panel, Side Mount 101862 Ladder Paint Color, Black, PPG (77'/UT 100'/107') 901219 Non-Metallic Paint
901036 Aerial Corrosion Protection
000968 Aerial Egress Paint, Red, PPG# FDGH-4353
911225 Ladder Sign Paint, Match Aerial Ladder Structure Color 001170 Under Body Finish, Two-Step Undercoating Process 006089 Corrosion Protection, Electrolysis Corrosion Kontrol (ECK) 900875
001033 Sample Paint Card with Paint Formula
901252 Dealer Supplied and Dealer Installed Lettering and Graphics 121752 Stabilizer Beam Striping, Front and Rear, (4) Stabilizers, 4" 100951 Chevron Color, Red / Black, 3M 4092 & 680-85
007382 Chevron Layout, Rear Body Surface, EXCLUDE Torque Box Door Warranties Warranties
RFW0002 General Two (2) Years or 36,000 Miles Limited Warranty RFW0502 Body Structure (Aluminum) Ten (10) Years or 100,000 Miles Limited Warranty
RFW0403 Aerial Ladder Structure Twenty (20) Years or 100,000 Miles Limited Warranty
9.a
Packet Pg. 336 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Quote #: 0026241 Page 12 of 12
Option ID Description
RFW0421 Aerial Leak-Free Hydraulics Three (3) Years or 48,000 Miles Limited Warranty
RFW0810 Aerial Waterway Ten (10) Years or 100,000 Miles Limited Warranty RFW0232 Control-Maxx Electronics Two (2) Years or 36,000 Miles Limited Warranty
RFW0800 Plumbing and Piping (Stainless Steel) Ten (10) Years or 100,000 Miles Limited Warranty
WLF800 Warranty, Water Tank, UPF, Standard Lifetime
RFW0710 Paint and Finish (Exterior Clear coated) Ten (10) Years Limited Warranty
W05810-A Warranty, Pump, Waterous, Standard 7 Year
9.a
Packet Pg. 337 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Spartan branded badging and Logo's shall be supplied.
INTENT OF SPECIFICATIONS
which the successful bidder must conform. Minor details of construction and materials solely responsible for the design and construction of all features.
Bids shall only be considered from companies that have an established reputation in the Each bidder shall furnish satisfactory evidence of his ability to construct the apparatus and furnish replacement parts for said apparatus.
Aerials containing load ratings and capabilities of the highest level within the respective model class shall be accepted. Bids submitted containing medium duty or light duty aerial ladders shall not be considered as meeting minimum requirements and will automatically be rejected.
CONTRACTOR'S SPECIFICATIONS
detailed description of the apparatus and equipment proposed and to which the apparatus furnished under contract shall conform.
and equipment.
The submitted bids shall clearly describe the capabilities of the aerial device. Items such information, estimated completed weight information and other pertinent information shall be either submitted with the bid or readily available if requested.
TIMELY PROPOSALS
It is the bidder's responsibility to see that their proposals arrive on time. Late proposals, facsimiles, e-mails, telegram, or telephone bids shall not be considered.
DRAWINGS
All bid drawings shall be stamped PROPOSAL.
9.a
Packet Pg. 338 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) A total of six (6) drawings shall be supplied. The provided drawings can be printed to any paper size, but the scale will only be valid when printed to the paper size listed in the title block
OAL (overall length) in feet and inches. The estimated length shall be rounded up to the nearest inch
OAH (overall height) in feet and inches. The estimated height shall be rounded up to the nearest inch
Wheelbase in inches
Pump house width in inches
Front of the body to the centerline of the rear axle in inches Front and rear overhang in inches
Angle of approach and departure
Roll up doors will be shown in open position. Lap doors will be shown in the closed position
Compartment dimensions shall be shown in a table on the drawing. The table shall display
1. Clear door opening - The width/height of the clear door opening
2. Interior dimensions - The interior compartment dimensions excluding any accessories or pockets (i.e. roll up door drums, hard suction hose pans, suspension pockets, etc.)
3. Divide heights - The measurement where the compartment changes from full depth to shallow depth
4. Compartment depths - Depth of the compartment with the door closed Ground ladders shall be labeled with a letter designation referring to the table for an explanation of the ladder
No pump panel or instrument panel controls, discharges or inlets shall be shown. The panel space is to be left blank and labeled "Pump Panel" shown
Water tank outline (if applicable)
Generator outline (if applicable)
Warning lights
D.O.T. lights
Chassis make/model
Fire pump make/model
Water tank capacity (if applicable)
Foam cell capacity (if applicable)
Body material
Hose bed capacity in cubic feet (if applicable)
Total compartment cubic feet
Utilize an unique bid number
Drawings shall be printed on white paper with black ink Text Block Items
PURCHASER'S OBLIGATIONS
9.a
Packet Pg. 339 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The purchaser reserves the right to accept or reject any or all bids on such basis as the purchaser deems to be in its best interest. All bidders shall be advised that the purchaser is not bound in any manner to automatically accept the lowest bid. The purchaser shall closely as possible.
SPECIALIZATION
Due to the complexity of the apparatus proposed, it is the desire of the purchaser to obtain equipment that is built by companies that specialize in the construction in accordance with NFPA, current edition compliant aerial devices.
The aerial device shall be engineered and fabricated by a manufacturer with a minimum aerial device provided shall be of the highest quality available in the industry.
SAFETY REQUIREMENTS
It is required that the bidder shall meet all State and Federal safety standards and laws use for which they are meant.
ACQUAINTANCE WITH SPECIFICATIONS
It is the responsibility of the bidder to review all of the bidding requirements. Failure of a bidder to be acquainted with this information shall not relieve them from any obligations of the bid requirements.
QUALITY AND WORKMANSHIP
The design of the apparatus shall embody the latest approved automotive engineering practices. Experimental designs and methods shall not be acceptable. consideration shall be given to the following points: accessibility of the various units that require periodic maintenance, ease of operation (including pumping and driving), and symmetrical proportions.
Construction shall be rugged and ample safety factors shall be provided to carry loads
GENERAL CONSTRUCTION
The complete apparatus, assemblies, sub-assemblies, component parts etc., shall be designed and constructed with due consideration to the nature and distribution of the load to be sustained and to the general character of service which the apparatus is to be subjected when placed in service.
All parts of the apparatus shall be strong enough to withstand the general service under full load. The apparatus shall be so designed that the various parts are readily accessible for lubrication, inspection, adjustment, and repair.
9.a
Packet Pg. 340 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) NFPA, Current Edition
American Society for Testing and Materials (ATSM A-36)
Society of Automotive Engineers, Inc. (SAE) "SAE Handbook" American Welding Society (AWS) AWSO 14.4-77
American Welding Society (AWS) D1.1 and D1.2
American Society of Non-Destructive Testing (ASNT) "ASNT CP-189 The apparatus shall be designed and constructed, and the equipment mounted, with due consideration to the distribution of the load between the front and rear axles, and side to overloading or damaging the apparatus in accordance with NFPA, current edition requirements.
LIABILITY
The bidder, if their bid is accepted, shall defend any and all suits and assume all liability for the use of any patented process, device or article forming a part of the apparatus or any appliance furnished under the contract.
WARRANTY
A copy of the warranties for the chassis, pump, body, paint, water tank (if applicable), aerial device, waterway, and waterway seals shall be furnished with each bidder's proposal.
INFORMATION REQUIRED UPON DELIVERY
The manufacturer shall supply at the time of delivery at least two copies of a complete operation and maintenance manual covering the completed aerial device as delivered.
Parts manuals, where possible, shall be cross-referenced to show the actual commercially available.
DESIGN / CONSTRUCTION / TESTING CRITERIA
herein:
The aerial ladder shall be designed, fabricated, and tested in accordance with the above
NON-DESTRUCTIVE TESTING
Steel ladders, turntable, stabilizers, and torque box shall have 100% of all welds tested using both magnetic particle method and visual testing method. Aerials that are fabricated of aluminum shall have 100% of all welds tested using dye penetrant method company. Manufacturers who rely on visual inspection (either in-house or by a third party) as the primary method of testing, and magnetic particle or dye penetrant as a secondary or "proving" test method for only suspect areas shall not be acceptable. In
9.a
Packet Pg. 341 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) any case, welds shall be tested using two (2) separate NDT inspection methods regardless of the material used to construct the aerial device.
THIRD PARTY CERTIFICATION
purchaser desires a device that has been tested by a third party for compliance with the manufacturer shall not be acceptable, no exceptions.
AERIAL DEVICE SAFETY FACTOR AND RATED CAPACITY
edition. Therefore, the aerial manufacturer shall hereby certify, by submitting a bid for
BID FORMS / SPECIFICATIONS
All bid forms shall be submitted on the attached bid form. The bid form and/or these cause for immediate rejection of any bid.
EXCEPTION TO SPECIFICATIONS
provided, they are listed and fully explained on a separate page entitled "EXCEPTIONS Each check in the "NO" column shall be listed and fully explained. Where no check is made in a particular paragraph either "YES" or "NO", it shall be assumed the bidder is taking exception to that paragraph. If a paragraph contains an empty column, where the bidder neglected to check the proper "YES" or "NO" column, it is assumed the bidder is not conforming to the requirements of this paragraph. If no explanation is given in the "EXCEPTIONS TO SPECIFICATIONS" document, the bid is subject to immediate rejection.
PROPOSALS TAKING TOTAL EXCEPTION TO THESE SPECIFICATIONS WILL BE IMMEDIATELY REJECTED.
The buyer is aware that all bidders shall have to take some exceptions, therefore; BIDDERS THAT TAKE NO EXCEPTIONS shall BE REQUIRED TO MEET EVERY PARAGRAPH TO THE FULLEST EXTENT SHOULD THEIR BID BE ACCEPTED. It is the intent of the purchaser to receive bids that do not require telephone calls or other communications to ascertain what a bidder is intending to supply. those supplied by the bidder with their proposal. Deviations shall not be acceptable unless noted as exceptions at the time of bid. The apparatus shall be rejected until said deviations are corrected to the satisfaction of the buyer.
9.a
Packet Pg. 342 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Accelerating from 0 to 35 mph within 25 seconds on a 0 percent grade Attaining a speed of 50 mph on 0 percent grade
Maintaining a speed of at least 20 mph on any grade up to and including 6 percent The maximum top speed of the apparatus shall not exceed the tire manufacturer's maximum speed rating for the tires installed on the apparatus Decisions regarding equal to or better than shall be the sole responsibility of the recipient of the bids rather than companies submitting bids. All deviations, regardless of the bid.
When exceptions are not taken but inconsistencies are noted in the submitted detailed
ROADABILITY
The apparatus, when fully equipped and loaded, shall be capable of the following performance while on dry paved roads that are in good condition:
FAILURE TO MEET TESTS
shall be cause for rejection. Failure to comply with changes as required to conform to changes, shall be cause for rejection of the apparatus.
Permission to keep or store the apparatus in any building owned or occupied by the constitute acceptance.
PROPOSAL SEQUENCE
ease of checking compliance. No exceptions shall be allowed to this requirement. The apparatus committee intends to be thorough during the evaluation of bids process. In this requirement must be strictly enforced.
AWARD OF CONTRACT
All bids submitted shall be valid for a minimum of 30 days during which time bid securities submitted with the proposals shall be held by the purchaser. Criteria for the award shall include, but not be limited to, the following:
9.a
Packet Pg. 343 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Apparatus Performance And Safety Levels / Considerations Completeness of proposal
Accuracy of accompanying data
Past performance of bidder
Financial stability of bidder
Local representation of the manufacturer
Serviceability of the proposed apparatus
Service capabilities of the bidder's local representative Compliance with NFPA, current edition
Any other factor the purchaser deems relevant
results and securities shall be returned.
ENGINE AVAILABILITY
slot at time of production, the engine will automatically be upgraded and charged for an X12 (or the X10 engine) with all costs associated with the upgrade being passed on to the end user. No exceptions.
If a pre-2027 emission engine is NOT available at the time of build (starting production on January 1, 2026) the order will automatically be upgraded and charged for either the 2027 engine compliant Cummins X-10 or X-15, with all associated costs being passed on to the end user. No exceptions.
and managed by a Company, Corporation, and/or Parent Company that is wholly based and permanently resides in the United States of America.
The Company, Corporation, and/or Parent Company, and all assets belonging to such,
PREREQUISITE BIDDING REQUIREMENTS
following conditions:
managed (in part or in whole) Company, Corporation, and/or Parent Company shall be any Company, Corporation, and/or Parent Company, that is owned, operated, managed, or held in contract, in part or wholly by a partnership or other agreement, shall be cause for immediate rejection.
Exceptions to these conditions will not be allowed under any circumstances.
NFPA
The National Fire Protection Association "Standard for Automotive Fire Apparatus", is out in full detail, with the exception of the section dealing with "Equipment
9.a
Packet Pg. 344 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Recommended for Various Types of Apparatus". Bidders shall provide the equipment requested herein and the buyer shall supply the rest before the apparatus is put into service. It is the intent of the purchaser to purchase an apparatus that meets 100% of exceptions to this requirement.
Ensure that understanding of all parties respective responsibilities have been addressed by the actual referencing of NFPA and the amendments in these Ensure that only structural materials complying with appropriate standards and codes are used for construction.
Ensure the applicable standards of design and manufacturing have been met or exceeded.
Ensure that safety factors have been met or exceeded where required.
Ensure that applicable standards for testing and inspection have been met or Ensure that where applicable components, equipment, and loose equipment carry the Ensure that in general and as a whole, all applicable requirements set forth in NFPA, exceeded, and/or addressed.
INSPECTION CERTIFICATE - NFPA COMPLIANCE
purpose of this NFPA compliance inspection shall be to serve as proof to the customer that all applicable standards have been met or exceeded by the responsible manufacturer.
The following objectives shall be achieved as a result (this listing shall not be construed as being all inclusive):
CONSTRUCTION DOCUMENTATION
The contractor shall supply, at the time of delivery, at least one (1) copy of the following documents:
1. The manufacturer's record of apparatus construction details, including the following information:
9.a
Packet Pg. 345 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Owners name and address
Apparatus manufacturer, model, and serial number
Chassis make, model, and serial number
GAWR of front and rear axles
Front tire size and total rated capacity in pounds or kilograms Rear tire size and total rated capacity in pounds or kilograms Chassis weight distribution in pounds with water and manufacturer mounted equipment (front and rear)
Engine make, model, serial number, rated horsepower, related speed, and governed speed
Type of fuel and fuel tank capacity
Electrical system voltage and alternator output in amps Battery make, model, and capacity in cold cranking amps (CCA) Chassis transmission make, model, and serial number; and if so equipped, chassis transmission PTO(s) make, model, and gear ratio
If applicable, the pump make, model, rated capacity in gallons or liters per minute, and serial number
Pump transmission make, model, serial number, and gear ratio, if unit is equipped with a pump
If applicable, the auxiliary pump make, model, rated capacity in gallons or liters per minute, and serial number
On aerial apparatus, the device type, rated vertical height in feet or meters, rated horizontal reach in feet or meters, and rated capacity in pounds or kilograms Paint manufacturer and paint number(s)
Company name and signature of responsible company representative aerial device, and all the technical information required for inspections to comply with NFPA 1914, Standard for Testing Fire Department Aerial Devices
6. If the apparatus is equipped with an air system, test results of the air quality, the equipment, and hose)
8. Written load analysis and results of the electrical system performance tests capacity
9.a
Packet Pg. 346 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Manufacturers name and address
Country of manufacturer
Source of service and technical information
Parts and replacement information
Wiring diagrams for low voltage and line voltage systems to include the following information: representations of circuit logic for all electrical components and wiring, components, safety interlocks, alternator-battery power distribution circuits, and input/ output assignment sheets or equivalent circuit logic implemented in multiplexing systems
Lubrication charts
Operating instructions for the chassis, any major components such as a pump or aerial device, and any auxiliary systems
Instructions regarding the frequency and procedure for recommended maintenance Overall apparatus operating instructions
Safety considerations
Limitations of use
Inspection procedures
Recommended service procedures
Troubleshooting guide
Apparatus body, chassis, and other component manufacturers warranties Special data required by this standard
apparatus
One (1) copy of the FAMA Safety Guide
OPERATION AND SERVICE DOCUMENTATION
The contractor shall supply at the time of delivery, at least two (2) sets of complete operation and service documentation covering the completed apparatus as delivered and accepted. The documentation shall address at least the inspection, service, and also provide documentation of the following items for the entire apparatus and each major operating system or major component of the apparatus:
The contractor shall deliver with the apparatus all manufacturers operations and service documents supplied with components and equipment that are installed or supplied by the contractor.
STATEMENT OF EXCEPTIONS
material with the bid package shall meet or exceed all applicable sections for the Should any area, section or portion of the apparatus not meet the intent and applicable not achieved shall be provided to the purchaser at the time of delivery.
9.a
Packet Pg. 347 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Ladder Rack(s) and Hose Bed Door(s) (if applicable)
Aerial - Retraction/Extension (if applicable)
Aerial - Rotation (if applicable)
Tiller - HVAC Hydraulics System (if applicable)
OWNER'S MANUAL
An owner's manual containing the construction, operation, and service documentation shall be provided on a USB Drive. One (1) copy of the USB shall be provided with the apparatus.
ELECTRICAL MANUAL
A complete electrical manual for the apparatus shall also be provided on the USB Drive. schematic manual designed to accommodate all apparatus. The electrical manual shall (including Node Input/output Spreadsheet and Node Relationship Spreadsheet), and Master Wire Listing. A contact letter shall also be provided by the electrical engineer, who built the manual, with instructions on using the manual and contact information for assistance with electrical manual questions.
ELECTRICAL SCHEMATICS
A section of the electrical manual shall include schematics of the electrical system and individual unit rather than a generic schematic designed to accommodate all apparatus.
PUMP PLUMBING SCHEMATICS (if applicable)
A section of the electrical manual shall include a schematic of the pump plumbing. This schematic designed to accommodate all apparatus.
HYDRAULIC SCHEMATICS (if applicable)
A section of the electrical manual shall include schematics of the hydraulic components on the apparatus including but not limited to:
FIRE APPARATUS SAFETY GUIDE
One (1) printed copy of the FAMA Fire Apparatus Safety Guide shall be provided with the
AERIAL OPERATION/PARTS/MAINTENANCE MANUALS
One (1) printed aerial operation and maintenance manual shall be provided with the apparatus at the time of delivery. These manuals shall be written in a "step by step" format for ease of reference. One (1) USB shall be provided with a digital copy of the aerial manuals included with the printed version. Finally, a digital version of the aerial manuals will also be included with the complete Owner's Manual USB for the apparatus.
9.a
Packet Pg. 348 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
1. terminology used in the manuals)
2. Safety Information and Warnings; (to warn of dangerous conditions/personnel injury/equipment damage)
3. 4. Complete and Detailed Operating Systems Descriptions; (to impart understanding of operation/capabilities/working principles)
5. Instruction For Manufacturer Recommended Deployment and Operation Of All the aerial device)
6. Current, Actual Illustrations Of Aerial Components Throughout The Manual; (to aid
7. Complete Maintenance Instructions/Methods/Materials/Intervals/Inspections.
Information included in the manuals shall include, but no be limited to the following:
General familiarization and demonstration of aerial device Aerial apparatus safety including a review of all safety devices, interlocks. and operational hazards
Positioning and locating the vehicle for safe operations Chassis parking brakes and engagement of hydraulic system Deployment of stabilization devices and use of ground pads Operation of elevation, extension, and rotation of the aerial device Operation and use of breathing air system
Shutdown and return to service operations
Operation of tip controls and platform controls if equipped AERIAL LADDER DEVICE DEMONSTRATION - (3) DAYS
A factory trained and authorized instructor shall provide three (3) consecutive days of on-site classes after apparatus acceptance.
Topics covered in the class shall include:
Classes shall consist of presentations as well as hands-on demonstration.
MISCELLANEOUS EQUIPMENT ALLOWANCE
The Gross Axle Weight Rating (GAWR) and the Gross Combined Weight Rating (GCWR) or Gross Vehicle Weight Rating (GVWR) of the chassis shall be adequate to carry the weight of the unequipped apparatus with the water tank and other tanks full, equipment allowance of 2,500 pounds.
9.a
Packet Pg. 349 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The apparatus shall go through actual tilt table testing which shall be determined by the apparatus manufacturer.
section 4.13.1.2 of NFPA, current edition.
The apparatus shall be deemed a similar apparatus and meeting the intent of section
4.13.1.1.2 of NFPA, current edition.
TILT TABLE TESTING NOT REQUIRED
The chassis of the apparatus is equipped with Electronic Stability Control (ESC), which is in accordance with NFPA, current edition. requirement of maintaining a stability of 26.5 degrees in both directions.
VEHICLE STABILITY
The apparatus shall comply with the requirements of NFPA, current edition as it applies 100% of rated capacity at 150 pounds net pressure
70% of rated capacity at 200 pounds net pressure
50% of rated capacity at 250 pounds net pressure
100% of rated capacity at 165 pounds net pressure
INDEPENDENT THIRD PARTY PUMP CERTIFICATION
company. Tests shall be conducted so that the pump performs as listed below:
The entire pump, both suction and discharge passages, shall be hydrostatically tested to a pressure of 600 PSI. The pump shall be fully tested at the pump manufacturer’s factory to the performance spots as outlined in accordance with NFPA, current edition. The pump shall be free from objectionable pulsation and vibration.
PUMP CERTIFICATION
Chassis arrival to the OEM
Fabrication
Pump and Plumbing
Paint
Assembly
Completion of production
ONLINE CUSTOMER INTERACTION
Smeal Holding LLC. shall provide the capability for online access. phases of construction.
The following phases will be captured and displayed:
The photos shall be uploaded to a secure website, only accessible to the customer and representatives of the OEM.
9.a
Packet Pg. 350 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
FINAL INSPECTION
the apparatus body manufacturer's facility. This will allow any changes that may be required, to be done so in a timely manner. After leaving the facility, all repairs or alterations will be performed by either the dealer or an OEM-approved service center.
MAXIMUM OVERALL HEIGHT
The overall height of the apparatus shall not exceed 143” (11'-11”) from the ground. This unloaded condition to ensure a maximum overall height. In order to provide the maximum overall height, proposed units using calculated weight as a means to achieve a lower overall height shall not be accepted. The measurement shall be taken at the highest point of the apparatus.
MAXIMUM OVERALL LENGTH
The overall length of the apparatus shall not exceed 487” (40’-7”).
WHEELBASE
The wheelbase of the apparatus shall not exceed 233".
ANGLE OF APPROACH
The angle of approach of the apparatus shall be a minimum of 8 degrees.
ANGLE OF DEPARTURE
The angle of departure of the apparatus shall be a minimum of 8 degrees.
SPARTAN GLADIATOR CHASSIS
The chassis shall be a Spartan Gladiator.
EXHAUST MITIGATION DEVICE
The chassis supplied exhaust mitigation device shall be installed by the apparatus body manufacturer.
CHASSIS AIR LINES
All chassis air brake system lines and accessories supplied by or connected to the chassis air brake system shall be plumbed using DOT approved compression style brass Pipe thread connections shall be sealed with thread sealant containing PTFE that is fast
TEFLON TAPE THREAD SEALANT SHALL NOT BE USED
All air systems shall be continuous endpoint-to-endpoint runs. HOSES SHALL NOT BE
9.a
Packet Pg. 351 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
EXTENDED USING ANY TYPE OF COUPLING SOLELY FOR THE PURPOSE OF LENGTHENING THE RUN OF HOSE.
The air system of the completed vehicle shall comply with FMVSS121.
MUD FLAPS
rearward of the rear axles on the apparatus.
RELOCATE CAB TILT
Any equipment compartment door that is not closed (excluding compartments with 4 cubic foot (0.1 cubic meter ) or less of volume; or have an opening of 144 square inches (92,000 square mm) or less; or doors that do extend sideways beyond the Any ladder or equipment rack that is not in the stowed position; Any device or component that is permanently attached to the apparatus that is open, extended, or deployed in a manner that is likely to cause damage to the apparatus that A hazard warning circuit shall be tied to the circuit for the "open door" warning light in the chassis in addition to the vehicle display to alert the driver of an unsafe condition for and rear views. The door, component or device that is not properly closed or stowed will be shown on the screen in the appropriate view. The light shall be illuminated automatically when the parking brake is not fully engaged and any of the following conditions exist:
A warning placard shall be near the warning light that reads "DO NOT Move Apparatus When Light Is On."
WATER TANK
The apparatus shall be equipped with a United Plastic Fabricating (UPF) 480 U.S. gallon record of construction and shall be provided to the purchaser upon delivery of the apparatus. The water tank shall be constructed of polypropylene sheet stock, a non-corrosive stress relieved thermoplastic material, black in color, and UV-stabilized for to be completely independent of the body and compartments. All joints and seams shall be nitrogen welded and tested for maximum strength and integrity. The top of the tank easy removal.
TANK BAFFLES
The swash partitions shall be manufactured of natural color 3/8" PT2E polypropylene,
9.a
Packet Pg. 352 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) cover to allow for positive welding and maximum integrity. All partitions shall be equipped with vent and air holes to permit movement of air and water between compartments. The and be welded to each other and the walls of the tank.
TANK SUMP
One (1) sump shall be provided in the bottom of the water tank, constructed of polypropylene, and located in the driver’s side front quarter of the tank. Tanks requiring a front suction shall incorporate a 4" schedule 40 polypropylene pipe with a dip tube from the front of the tank to the sump location. The sump shall be used as a combination clean-out and drain. An anti-swirl plate shall be located approximately 2" above the sump.
TANK FILL CONNECTION
GPM.
TANK LID
The tank lid shall be constructed of polypropylene and incorporate a three-piece locking design allowing for individual removal and inspection if necessary. The tank lid shall be recessed 3/8" from the top of the tank and welded to the sides and the longitudinal partitions for maximum integrity. The lid shall have hold downs consisting of 2" polypropylene dowels spaced a maximum of 30" apart. These dowels shall extend minimum of two lifting dowels shall be drilled and tapped 1/2" x 13" to accommodate the lifting eyes.
WATER TANK MOUNTING
structure shall be supported by and welded directly to the top plate of the torque-box.
WATER TANK DRAIN
A 1-1/2" drain valve shall be provided in the pump compartment to drain the water tank.
The valve shall include a locking lever to prevent accidental draining of the water tank when there is an external drain.
WATER TANK FILL TOWER
black 1/2" PT2E polypropylene and be a minimum dimension of 8" x 8" at the outer perimeter. The tower shall have a 1/4" thick removable polypropylene screen and a PT2E polypropylene hinged-type cover.
9.a
Packet Pg. 353 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
WATER TANK LEVEL GAUGE
One (1) Fire Research, model WLA300-A00, TankVision Pro 300 water tank level gauge shall be provided on the pump operator's control panel.
The gauge shall have nine (9) easy to see super bright RGB LEDs to show the tank volume. The display shall use a two-dimensional, two-element lens to refract the light from the LEDs to provide full 180° visibility for the level indication. The gauge shall start the pump operator when the tank is almost empty.
FRC MAXVISION WATER TANK LEVEL DISPLAYS
An FRC MaxVision water tank level strip light shall be installed on the driver's side and datalink needed for all strips to mimic each other.
4" WATER TANK OVERFLOW
rear axle.
FOAM CELL
One (1) United Plastic Fabricating (UPF) 20 U.S. gallon foam cell shall be incorporated into the water tank. One (1) pressure/vacuum vent shall be installed and one (1) drain hose shall be connected to the foam cell. The drain shall have a quarter-turn valve installed inside the pump compartment and it shall drain below the frame rail of the chassis.
The foam cell shall be designed for use with Class "A" foam. front corner of the water tank. The capacity of the cell shall be engraved on the top of the
HOSE BED
side of the water tank. The hose bed shall extend backward, past the side of the turntable support, and exit at the rear of the apparatus through one (1) access opening.
The access opening shall be free of obstructions that may interfere with the deployment and loading of hose. One (1) painted aluminum door shall cover The hose bed access opening. The door shall be a horizontally hinged lift-up design with a positive latch gas strut hold open device. A 1" stainless steel body trim piece shall be at the rear-bottom of
9.a
Packet Pg. 354 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The hose bed, to protect the chevron striping when deploying hose. material to prevent the accumulation of water and to allow ventilation to aid in drying The top portion of each "T" cross section shall measure 1-1/4" wide and 3/16" thick with beaded ends. The vertical portion shall be 3/8" thick, beading out at the bottom to a thickness of 1/2" and tall enough to result in an overall height of 1". The "T" sections shall be spaced 3/4" apart to allow for drainage and ventilation. strands that are high in resistance to tension, compression and bending. An outer sheath consisting of a continuous strand mat to prevent linear splitting and slipping shall surround the core. The sheath shall also serve to draw the protective resin to the bar surface. Both reinforcements shall be pulled through an isophthalic polyester resin, rays. The bright white coating shall be baked on.
The hose bed shall be sized to accommodate the following hose load capacity:
HOSE BED CAPACITY
The hose bed shall have a minimum capacity of 30 ft³ of hose storage.
TOP / END COVERS
The top and/or end covers shall be provided and installed by the dealer/Customer. The customer shall sign a statement of exceptions.
HOSE BED LOADING LIGHTS
Two (2) Spartan/Smeal, hose bed loading lights shall be provided to illuminate of the hose bed area in accordance with NFPA, current edition. The lights shall be a 9" tube light with a chrome housing. Two (2) shall be located as deemed best by the body builder unless stated in the shop note. The hose bed lighting circuit shall be activated when the parking brake is engaged.
ALUMINUM BODY CONSTRUCTION
The apparatus body shall be fabricated from 1/8" 5052-H32, smooth aluminum sheet.
The total outside width of the apparatus body shall not exceed 100 inches. The width measurement of the sidewalls shall be made from the outside wall of the two opposite sides of the body.
The complete apparatus body shall be fabricated utilizing the break and bend techniques
9.a
Packet Pg. 355 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The main body compartments on each side, as well as the rear center compartment if department's equipment. The door opening threshold shall be positioned lower than the Continuous, solid welded seams shall be located at the upper front and upper rear shall also have solid weld seams. All door jams, on both the top and the bottom, shall be solid welded as well. Each main door jam consists of a double jam design; this is comparable to a double struck frame design, which provides superior strength and durability. All double door jams are to be welded together utilizing the plug weld technique. All remaining compartment walls shall be stitch welded. compartments as well as the rear center compartment, if applicable, shall be welded to the rear deck support structure. This rear deck support structure is specially designed for the galvanized apparatus body substructure. Each lower, rear compartment shall be adequately stitch welded to the cross tubes providing strength and durability to the entire apparatus body.
The body design shall include a "false wall" design in the lower portion of each lower, rear compartment. This "false wall" is required in order to allow for easy accessibility to the rear electrical components found in the rear tail light cluster area.
On the upper area of the apparatus body, directly above the side compartment door openings, a header is to be fabricated from smooth, aluminum sheet. This area shall be free of any body seams and shall be painted the same color as the apparatus body. The height of the header may vary depending on the following factors: apparatus design, lettering requirements, scene lights and warning light requirements as well as various other options. A "J" channel shall be incorporated into the body design in order to provide a rain gutter to further assist in preventing excessive moisture from getting into the compartments.
SIDE COMPARTMENT DOORS
ROM roll-up doors shall be installed on each side body compartment, eight (8) total.
Each door shall be a shutter type with slats that roll onto a spool at the top of the compartment. Each slat shall be equipped with nylon end shoes to assure operation without the need for constant lubrication. The door slats and tracks shall be wet painted by the door manufacturer to match the apparatus body.
integrated into the bottom rail for easy one hand operation.
DOOR HANDLES
The door handles on the side body compartments of the apparatus shall be non-locking style.
9.a
Packet Pg. 356 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
PULL DOWN STRAP
There shall be vendor supplied pull down straps installed on each roll-up door.
REAR COMPARTMENT DOOR
One (1) horizontally hinged lap type compartment door shall be installed. The lap door shall be a single panel construction and fabricated of aluminum. The door shall be painted job color. The edges of the door shall be formed to an inward angle for added rigidity. Rubber molding shall be installed in the overlap area of the door to ensure a weatherproof seal and prevent water from collecting in the door sill. The compartment door shall have a polished stainless steel continuous hinge with a rubber seal installed between the hinge and the aluminum door to separate the dissimilar metals. The hinge pin shall be stainless steel with a minimum diameter of 1/4".
The compartment door handle shall be a non-locking stainless steel recessed "D" ring type handle. A safety latch with striker plate shall be included with the door handle assembly.
cylinders shall assist in closing the door automatically when the door is positioned over the center.
The inner door face shall be painted the primary body color. The panels shall have a
BODY COMPARTMENT LIGHTING
A total of sixteen (16) LED compartment lights shall be installed in the body compartments. Each tube light shall be centered vertically along each side of the door
COMPARTMENT COATING
The interior of the body compartments shall be coated with gray Bedliner Coating unless and tear of equipment removal and shifting.
TURTLE TILES
Black Turtle Tile Plastics interlocking squares shall be provided in all of the body side maximum slip resistance and drainage each square shall have a grid surface design.
COMPARTMENT AIR RELEASE
Each compartment shall be vented to help remove trapped air when closing the compartment door. The vent shall be a rubber gasket in the area of the outboard corners of the compartment. Wiring may also be run through these areas.
COMPARTMENT DRAIN HOLES
9.a
Packet Pg. 357 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Each body compartment shall be equipped with drain holes to allow standing water to exit underneath the apparatus.
SILL PROTECTORS
A stainless steel angle sill protector shall be installed on the bottom sill area of the compartment with a lap style door to aid in reducing paint damage from equipment. The sill protector shall be attached using permanent-bonding double-sided tape.
FUEL FILL
and frame shall all be constructed out of stainless steel material.
Fuel Tank Vent Line
STANDARD WHEEL WELL STORAGE
The wheel well area of the apparatus shall be designed to additional components.
Height: 58"
Width: 25"
Depth: 14" Upper and 23" Lower
Intermediate Divide Height: 30"
Height: 24"
Width: 78"
Depth: 14" Upper and 14" Lower
Intermediate Divide Height: 0"
DRIVER'S (LEFT) SIDE BODY COMPARTMENTS
COMPARTMENT L1
A full height compartment shall be located ahead of the rear wheels on the driver's side of the apparatus body. This compartment shall be designated as L1 within these The dimensions of the compartment shall be:
COMPARTMENT L2
A standard height compartment shall be located above the rear wheels on the driver's side of the apparatus body. This compartment shall be designated as L2 within these The dimensions of the compartment shall be:
COMPARTMENT L3
A standard height compartment shall be located above the rear wheels on the driver's side of the apparatus body. This compartment shall be designated as L3 within these
9.a
Packet Pg. 358 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Height: 16"
Width: 51"
Depth: 14" Upper and 14" Lower
Intermediate Divide Height: 0"
Height: 47"
Width: 26"
Depth: 14" Upper and 23" Lower
Intermediate Divide Height: 25"
The dimensions of the compartment shall be:
COMPARTMENT L4
A full height compartment shall be located behind the rear wheels on the driver's side of the apparatus body. This compartment shall be designated as L4 within these The dimensions of the compartment shall be:
L1 Components
ADJUSTABLE SHELF
One (1) aluminum adjustable shallow-depth shelf shall be installed in the compartment.
The shelf shall be constructed of 3/16" aluminum sheet with a minimum of 2" lips. The liquids to readily drain.
FLOOR MOUNTED ROLL OUT TRAY
tray shall be equipped with an Austin Hardware drawer slide. The roller assembly shall have a rated capacity of 300 lbs. distributed load and shall have 100% extension capability. The tray shall be constructed of 3/16" aluminum sheet with 3" lips. The tray the tray in either a fully extended or closed position. The tray shall be equipped with the Austin Hardware front drawer release system which allows for one handed operation of the system.
COMPARTMENT STRUTS
Aluminum vertical strut channels shall be welded in the compartment. Two (2) struts shall be provided for any full depth portion and one (1) strut shall be provided for any shallow depth portion.
L2 Components
ADJUSTABLE SHELF
One (1) aluminum adjustable shallow-depth shelf shall be installed in the compartment.
The shelf shall be constructed of 3/16" aluminum sheet with a minimum of 2" lips. The liquids to readily drain.
9.a
Packet Pg. 359 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
COMPARTMENT STRUTS
Aluminum vertical strut channels shall be welded in the compartment. Two (2) struts shall be provided for any full depth portion and one (1) strut shall be provided for any shallow depth portion.
L3 Components
ADJUSTABLE SHELF
One (1) aluminum adjustable shallow-depth shelf shall be installed in the compartment.
The shelf shall be constructed of 3/16" aluminum sheet with a minimum of 2" lips. The liquids to readily drain.
COMPARTMENT STRUTS
Aluminum vertical strut channels shall be welded in the compartment. Two (2) struts shall be provided for any full depth portion and one (1) strut shall be provided for any shallow depth portion.
L4 Components
ADJUSTABLE SHELF
One (1) aluminum adjustable shallow-depth shelf shall be installed in the compartment.
The shelf shall be constructed of 3/16" aluminum sheet with a minimum of 2" lips. The liquids to readily drain.
ADJUSTABLE SHELF
One (1) aluminum adjustable full-depth shelf shall be installed in the compartment. The shelf shall be constructed of 3/16" aluminum sheet with a minimum of 2" lips. The shelf to readily drain.
FLOOR MOUNTED ROLL OUT TRAY
tray shall be equipped with an Austin Hardware drawer slide. The roller assembly shall have a rated capacity of 300 lbs. distributed load and shall have 100% extension capability. The tray shall be constructed of 3/16" aluminum sheet with 3" lips. The tray the tray in either a fully extended or closed position. The tray shall be equipped with the Austin Hardware front drawer release system which allows for one handed operation of the system.
COMPARTMENT STRUTS
Aluminum vertical strut channels shall be welded in the compartment. Two (2) struts shall be provided for any full depth portion and one (1) strut shall be provided for any shallow depth portion.
9.a
Packet Pg. 360 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) DRIVER'S SIDE REAR WHEEL WELL POSITION - WL1
A single air bottle compartment shall be installed in the forward portion of the rear wheel constructed of stainless steel material. The door shall have a rubber gasket to create a 100% seal to protect the interior of the compartment. The storage compartment shall be primary body color.
DRIVER'S SIDE REAR WHEEL WELL POSITION - WL2
Two (2) single air bottle compartments shall be installed in the rear wheel well area constructed of stainless-steel material. The doors shall have a rubber gasket to create a 100% seal to protect the interior of the compartment. Each storage compartment shall be painted primary body color.
DRIVER'S SIDE REAR WHEEL WELL POSITION - WL3
A single extinguisher/water can compartment shall be installed in the rearward portion of the rear wheel well area, on the driver's side. The compartment shall be large enough to stainless-steel material. The door shall have a rubber gasket to create a 100% seal to protect the interior of the compartment. The storage compartment shall be a molded body color.
Height: 58"
Width: 25"
Depth: 14" Upper and 0" Lower
Intermediate Divide Height: 30"
Height: 24"
Width: 78"
Depth: 14" Upper and 14" Lower
Intermediate Divide Height: 0"
OFFICER'S (RIGHT) SIDE BODY COMPARTMENTS
COMPARTMENT R1
of the apparatus body. This compartment shall be designated as R1 within these The dimensions of the compartment shall be:
COMPARTMENT R2
side of the apparatus body. This compartment shall be designated as R2 within these The dimensions of the compartment shall be:
9.a
Packet Pg. 361 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Height: 16"
Width: 51"
Depth: 14" Upper and 14" Lower
Intermediate Divide Height: 0"
Height: 47"
Width: 48"
Depth: 14" Upper and 23" Lower
Intermediate Divide Height: 25"
COMPARTMENT R3
side of the apparatus body. This compartment shall be designated as R3 within these The dimensions of the compartment shall be:
COMPARTMENT R4
the apparatus body. This compartment shall be designated as R4 within these The dimensions of the compartment shall be:
R1 Components
ADJUSTABLE SHELF
One (1) aluminum adjustable shallow-depth shelf shall be installed in the compartment.
The shelf shall be constructed of 3/16" aluminum sheet with a minimum of 2" lips. The liquids to readily drain.
FLOOR MOUNTED ROLL OUT TRAY
tray shall be equipped with an Austin Hardware drawer slide. The roller assembly shall have a rated capacity of 300 lbs. distributed load and shall have 100% extension capability. The tray shall be constructed of 3/16" aluminum sheet with 3" lips. The tray the tray in either a fully extended or closed position. The tray shall be equipped with the Austin Hardware front drawer release system which allows for one handed operation of the system.
COMPARTMENT STRUTS
Aluminum vertical strut channels shall be welded in the compartment. Two (2) struts shall be provided for any full depth portion and one (1) strut shall be provided for any shallow depth portion.
R2 Components
ADJUSTABLE SHELF
One (1) aluminum adjustable shallow-depth shelf shall be installed in the compartment.
9.a
Packet Pg. 362 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The shelf shall be constructed of 3/16" aluminum sheet with a minimum of 2" lips. The liquids to readily drain.
COMPARTMENT STRUTS
Aluminum vertical strut channels shall be welded in the compartment. Two (2) struts shall be provided for any full depth portion and one (1) strut shall be provided for any shallow depth portion.
R3 Components
ADJUSTABLE SHELF
One (1) aluminum adjustable shallow-depth shelf shall be installed in the compartment.
The shelf shall be constructed of 3/16" aluminum sheet with a minimum of 2" lips. The liquids to readily drain.
COMPARTMENT STRUTS
Aluminum vertical strut channels shall be welded in the compartment. Two (2) struts shall be provided for any full depth portion and one (1) strut shall be provided for any shallow depth portion.
R4 Components
ADJUSTABLE SHELF
One (1) aluminum adjustable shallow-depth shelf shall be installed in the compartment.
The shelf shall be constructed of 3/16" aluminum sheet with a minimum of 2" lips. The liquids to readily drain.
FLOOR MOUNTED ROLL OUT TRAY
tray shall be equipped with an Austin Hardware drawer slide. The roller assembly shall have a rated capacity of 300 lbs. distributed load and shall have 100% extension capability. The tray shall be constructed of 3/16" aluminum sheet with 3" lips. The tray the tray in either a fully extended or closed position. The tray shall be equipped with the Austin Hardware front drawer release system which allows for one handed operation of the system.
COMPARTMENT STRUTS
Aluminum vertical strut channels shall be welded in the compartment. Two (2) struts shall be provided for any full depth portion and one (1) strut shall be provided for any shallow depth portion.
OFFICER'S SIDE REAR WHEEL WELL POSITION - WR1
A single air bottle compartment shall be installed in the forward portion of the rear wheel
9.a
Packet Pg. 363 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) constructed of stainless-steel material. The door shall have a rubber gasket to create a 100% seal to protect the interior of the compartment. The storage compartment shall be primary body color.
OFFICER'S SIDE REAR WHEEL WELL POSITION - WR2
Two (2) single air bottle compartments shall be installed in the rear wheel well area, constructed of stainless-steel material. The doors shall have a rubber gasket to create a 100% seal to protect the interior of the compartment. The storage compartments shall be painted primary body color.
OFFICER'S SIDE REAR WHEEL WELL POSITION - WR3
A single extinguisher/water can compartment shall be installed in the rearward portion of stainless-steel material. The door shall have a rubber gasket to create a 100% seal to protect the interior of the compartment. The storage compartment shall be a molded body color.
REAR BODY COMPARTMENT
A compartment shall be located at the rear of the apparatus that extends into the apparatus torque box.
HOT-DIP GALVANIZED STEEL BODY MOUNT SUB FRAME
The main body mount sub frame shall be constructed from formed steel channel bolted and welded to the torque box. The sub frame shall be located at the front and rear of the body and in front of, above, and rear of the wheel well opening.
The compartment area behind the rear axle shall be supported by a drop frame fabricated of steel tube and angles. All drop frame structures shall be welded directly to the torque box to allow the body to be a completely separate structure from the chassis.
BODY RUB RAILS
Rub rails shall be installed beneath the compartment doors to protect the apparatus body from damage should the body be brushed or rubbed against another object. The rub rails shall be 2-1/2" x 1", 3/16" aluminum channel. The rub rails shall be highly polished and then bright dip anodized.
The rub rails shall be installed on the body utilizing non-corrosive nylon spacers and secured with stainless steel bolts. The outside edge of the rub rails shall be even with the fenderettes and bolt-on steps to prevent snagging.
TWO REAR TOW EYES
Two (2) chrome plated tow eyes shall be installed at the rear of the apparatus above the
9.a
Packet Pg. 364 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) rear step area. The tow eyes shall be bolted to a heavy-duty assembly that is welded to the torque box. The tow eyes shall have a 2-1/2" ID hole.
REAR WHEEL WELLS
The fenders shall be integral with the body sides and compartments with a seamless the wheel well area for ease of cleaning and maintenance. The liners shall match the to allow the use of tire chains when the apparatus is fully loaded.
STAINLESS STEEL FENDERETTES
Four (4) stainless steel fenderettes shall be installed at the outboard edge of the rear wheel well area, two (2) on each side. The fenderettes shall be bolted to the apparatus body using nylon washers to space them slightly away from the body to reduce the build-up of road grime. The fenderettes shall be constructed of stainless steel that has been
EXHAUST HEAT DEFLECTOR SHIELD
LICENSE PLATE BRACKET
A license plate bracket shall be mounted on the rear of the apparatus. A clear LED light shall be incorporated into the bracket.
TRIMRITE STAINLESS STEEL FASTENERS
TrimRite stainless steel fasteners shall be provided for all exposed and unpainted fasteners throughout the body in locations such as overlays, pump panels, and other numerous hardware mounting locations. TrimRite stainless is a hardenable martensitic stainless steel that provides a high level of corrosion resistance, hardness up to Rockwell C 51, good cold formability and ease of heat treatment, all of which combine to provide an alloy which has been used for many applications. TrimRite stainless is tested to salt spray standard ASTM B117, which is a 200-hour salt spray test. The OEM shall use TrimRite stainless with an added blue patch which provides improved vibration resistance for the fasteners.
WALKWAYS AND OVERLAYS
All exterior surfaces designated by the manufacturer as stepping, standing, or walking areas shall be overlaid with 3003 H22 bright tread plate to provide a slip resistant surface, even when the surface is wet. All interior surfaces designated by the manufacturer as stepping, standing, or walking areas shall be slip resistant when the surface is dry. The degree of slip resistance shall be in accordance with NFPA, current edition.
Horizontal walkways shall have .080" aluminum tread plate overlays installed and vertical surfaces shall have .125" aluminum tread plate overlays. Overlays shall be installed that are totally insulated from the apparatus with nylon shoulder washers that extend into holes in the body. Stainless steel cap nuts shall be employed where bolt
9.a
Packet Pg. 365 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) ends may damage equipment or cause injury. After the apparatus is painted and the overlays are reinstalled, they shall be additionally sealed at the edges with a caulking edges of the apparatus body.
Any designated horizontal standing or walking surface higher than 48" from the ground and not guarded by a railing, or structure at least 12" high shall have a "safety yellow line" marking the outside perimeter of the designated standing or walking surface area. standing and walking surfaces. Steps and ladders shall not be required to have the yellow line.
STEPPING SURFACES
All steps shall have a surface area of at least 35 square inches and shall be able to withstand a load of at least 500 pounds. Steps shall be provided at any area that personnel may need to climb and shall be adequately lit.
TURNTABLE ACCESS LADDER
A "Smart" aluminum fold down access ladder shall be provided and installed at the left rear of the apparatus for access to the turntable, rearward of the side body compartments. The ladder rungs shall be constructed of a slip resistant stepping material.
The upper section shall be permanently secured to the body with a mechanical style hinge and fasteners that allow the ladder to extend down and out to the ground from the apparatus body. When deployed, the fold-down steps shall create a safe and comfortable climbing angle.
Two (2) gas cylinders shall be installed to assist in the deployment of the lower fold-down section. Access ladder rung illumination shall be provided during low light conditions.
If the step is not properly stowed and the transmission is placed into drive or reverse mode with the parking brake released, it shall activate the hazard light in the cab to alert the crew.
A grab handle shall be installed on top of the body at the rear of the apparatus. the bottom of the last step in two directions so when the step is folded up you can read it from standing on top of the turn table or by standing on the ground.
FRONT TREAD PLATE OVERLAYS
A tread plate overlay shall be located on the front vertical areas of each side of the apparatus body.
And if applicable, a tread plate overlay shall be located on the rear face of each outrigger housing.
The overlays shall be located on the front of the body compartments.
9.a
Packet Pg. 366 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
FRONT BODY STEPS AND LIGHTING
Four (4) Innovative Controls folding steps (3004234-27-1-1-1-1-0) shall be located on the front of the driver's side body compartments. The folding steps shall have two large open slots to prevent the buildup of ice or mud and to provide a hand-hold when necessary.
The steps shall have a surface area of at least 35 square inches and shall be able to withstand a load of 500 pounds.
Each step shall be a backlit polydomed Spartan Logo, a LED step light module and a bottom down-light module.
FRONT BODY STEPS AND LIGHTING
Four (4) Innovative Controls folding steps (3004234-27-1-1-1-1-0) shall be located on the open slots to prevent the buildup of ice or mud and to provide a hand-hold when necessary. The steps shall have a surface area of at least 35 square inches and shall be able to withstand a load of 500 pounds.
Each step shall be a backlit polydomed Spartan Logo, a LED step light module and a bottom down-light module.
A handrail shall be installed forward on the top of the body, on the driver's side.
GROUND LADDER STORAGE
The ground ladders shall be stored within the torque box and shall be removable from the rear of the apparatus. The ladders shall be fully enclosed so road dirt and debris cannot foul or damage the ladders. The ladders shall be stored in individual full-length slides so they can be removed individually.
The Little Giant ladder will be stored unfolded in the ladder rack.
The following ground ladders shall be supplied with the apparatus:
One (1) Duo-Safety, model 585-A, 10' aluminum folding ladder shall be provided.
One (1) Wing Enterprises, model 15187-882, 17' aluminum Little Giant Defender NFPA compliant ladder shall be provided.
Two (2) Duo-Safety, model 875-DR, 16' aluminum roof ladder with roof hooks on each end shall be provided.
One (1) Duo-Safety, model 1200-A, 28' aluminum two-section extension ladder shall be provided.
One (1) Duo-Safety, model 1225-A, 35' aluminum three-section extension ladder shall be provided.
9.a
Packet Pg. 367 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
PIKE POLE STORAGE
Six (6) aluminum tubes for the storage of pike poles shall be installed inside the torque box. The provisional tubes shall be for the dealer supplied 6', 8', 12' standard pike poles and for 6', 8' and 10' New York style pike poles, (1) each.
PIKE POLE STORAGE
Two (2) aluminum trays for the storage of pike poles shall be installed inside the upper portion of the torque box.
The dealer supplied poles will be 4' D-handle.
PUMP COMPARTMENT
The complete apparatus pump compartment shall be constructed of a combination of structural tubing and formed sheet metal. The same materials used in the body shall be utilized in the construction of the pump compartment. The structure shall be welded module. These processes shall ensure the quality of structural stability of the pump compartment module.
The pump compartment module shall be separated from the apparatus body with a gap. encountered while the vehicle is in transit so that harmful torsional forces are not transmitted into the structural framework.
The pump module substructure shall be mounted above the frame to allow independent the chassis frame rails with steel, gusseted mounting brackets. Each pump compartment Each assembly shall have a two-part rubber vibration isolator. The isolator shall be of a mounts utilized shall correspond directly to the anticipated weight being supported. connections shall be bolted so that in the event of an accident, the body shall be easily removable from the truck chassis for repair or replacement.
PUMP COMPARTMENT LIGHTS
Two (2) 9" LED tube lights shall be installed in the pump compartment.
DRIVER'S SIDE RUNNING BOARD
A running board constructed of anti-slip tread plate, shall be installed on the driver's side of the pump module. The stepping area shall be as large as possible, overlapping the perimeter of the running board structure.
9.a
Packet Pg. 368 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
OFFICER'S SIDE RUNNING BOARD
running board. The stepping areas shall be as large as possible, overlapping the perimeter of the running board structure.
Two (2) PAC, model K5006, straps shall be provided and installed over the top of the compartment.
PULL-OUT PLATFORM
One (1) Innovative Industries pull-out platform shall be located on the driver's side of the pump module. The top surface of the platform shall be constructed of aluminum serrated bar grating for ease of maintenance and to provide a slip resistant surface for the operator. The platform shall lock in both the retracted and the extended position. The pull-out platform shall be capable of supporting a maximum of 500 pounds and shall be wired to the door ajar circuit.
corrosion protection.
DUNNAGE COMPARTMENT
A dunnage compartment shall be located above the pump module. The dunnage shall be abraded aluminum.
OFFICER'S SIDE DUNNAGE ACCESS PANEL
panel to allow access to the dunnage compartment. The vertically hinged panel shall be of the single pan design and shall be positively latched in the closed position utilizing (2) two compression latches. The door shall have a chrome suitcase handle installed between the compression latches. A gas strut shall be provided on the door. A stainless steel sill protector shall be installed on the bottom of the door opening to protect the paint from chipping and scratching. The door shall be wired into the door-ajar warning light circuit.
CONTROL PANEL
The driver's side of the pump enclosure shall be divided into two sections. The lower section shall contain all valve controls, primer controls, discharge relief valve controls (pilot valve), and other mechanical controls. This surface shall be referred to as the "control panel".
All valve controls shall be the self-locking type, activated by either direct control or with a direct linkage utilizing friction locking bell cranks and universal ball swivels. The primary valve handles shall have color coded tags installed in a recessed area to clearly denote the purpose of each control.
9.a
Packet Pg. 369 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
INSTRUMENT PANEL
The surface up above the control panel shall contain all instruments, gauges, test The instrument panel shall be independent and hinged and latched. All instruments, tubing, or plumbing to allow the panel to swivel to the fully open position.
The instrument and gauge panel shall be vertically hinged "swing out" to provide access for service.
OFFICER'S SIDE PUMP PANEL
associated equipment are located. This panel shall be easily removed and held in place with quick release push latches. It shall be fully removable for pump and plumbing access without the need to use hand tools. Any electrical equipment installed shall be equipped with connectors so they may be easily separated when the below described front access panel is removed.
PANEL SURFACES
black Bedliner Coating for maximum resistance to abrasion and to minimize glare. The weather.
GARNISH RING BEZEL ASSEMBLIES POLISH STAINLESS STEEL
Polish Stainless steel intake and discharge garnish rings shall be installed on the apparatus.
VERBIAGE TAG BEZEL ASSEMBLIES (Spartan Style)
Innovative Controls (Spartan Style) verbiage tag and bezels shall be installed. The bezel assemblies will be used to identify apparatus components.
SAFETY MESSAGE BEZEL ASSEMBLIES
Innovative Controls safety message and bezels shall be installed. The assemblies will be used to identify, instruct, or warn the operators.
The Innovative Controls verbiage and safety message tags shall be designed and assemblies shall feature a chrome-plated panel-mount bezel with durable UV resistant polycarbonate inserts. These UV resistant polycarbonate graphic inserts shall be sub-surface screen printed to eliminate the possibility of wear and protect the inks from fading. All insert labels shall be backed with 3M permanent adhesive (200MP), which meets UL969 and is in accordance with NFPA, current edition.
9.a
Packet Pg. 370 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
PUMP PANEL LIGHTING
illuminated by LED tube lighting. The pump panel lights shall become energized upon setting the park brake so the gauge information provided may be consulted. A stainless steel shield shall be installed over the pump panel lights to further protect them from the
PUMP PANEL LIGHT SWITCH
lights.
MIDSHIP MOUNT FIRE PUMP
service.
The pump body shall be cast as two (2) horizontally split pieces. The body shall be made of high tensile, close-grained gray iron with a minimum tensile strength of 40,000 PSI.
FLAME PLATED IMPELLER HUBS
accurately balanced for vibration free running. The stripping edges shall be located on The impeller shaft shall be stainless steel, accurately ground to size and supported at each end by oil or grease lubricated anti-friction ball bearings for rigid, precise support.
The bearings used on the impeller shaft shall be automotive type bearings, easily cross-referenced and readily available at normal parts or bearing stores. plating process, the base metal shall not be allowed to exceed a temperature of 300 degrees Fahrenheit to prevent altering the metallurgical properties of the impeller material.
IMPELLER WEAR RINGS
The pump shall be equipped with replaceable bronze wear rings for increased pump life the face of the impeller hubs forming a labyrinth that, as the clearance increases with age, directs water from the discharge side in several directions eventually exiting outward, away from the eye of the impeller hub.
LUBRICATION SYSTEM
An internal lubrication system shall deliver lubricant directly to the drive chain. This unique design shall eliminate the need for an external lubrication pump and auxiliary cooling. Oil shall be supplied with the lubrication system.
PUMP TRANSMISSION
9.a
Packet Pg. 371 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The pump shall have a Waterous model C20 series transmission. The housing of the transmission shall be constructed of high strength, three-piece, horizontally split aluminum. The drive line shafts shall be made from alloy steel forgings, hardened and ground to a size 2.350 inch 46 tooth involute spline. The drive and driven sprockets shall be made of steel and shall be hardened and have ground bores. The drive chain shall be a Morse HV high strength involute form chain. Bearings shall be deep-groove, anti-friction ball bearings and shall give support and proper alignment with the impeller shaft assembly. Bearings shall be oil splash lubricated, completely separated from the water being pumped, and protected by a V-ring and oil seal. An internal lubrication system shall deliver lubricant directly to the drive chain. This unique design eliminates the need for an external lubrication pump and auxiliary cooling. The pump and transmission shall be easily separable. A two-piece shaft shall be splined allowing for individual repair of either the pump or transmission, to keep down time to a minimum. All drive line components
MECHANICAL SEALS
The pump shall be equipped with self-adjusting, maintenance free mechanical shaft seals that shall not require manual adjustment. These seals shall be designed in a manner such that they shall remain functional enough to permit continued use of the pump in the unlikely event of a seal failure.
Two (2) on the intake side of the pump
ANODES
shall aid in preventing galvanic corrosion within the water pump and be easily replaceable. The anodes shall be installed as follows:
The pump shall be rated at 1750 gallons per minute.
FIRE PUMP MOUNTING
connected to the apparatus body.
The pump shall be frame mounted as per pump manufacture recommended guidelines; therefore minimizing the likelihood of the pump casing cracking should the apparatus be involved in a collision.
The pump module shall be mounted to the frame in a minimum of four (4) locations and shall be reinforced appropriately in order to carry the expected load for the life of the apparatus.
PUMP SHIFT
The pump shift shall be supplied and installed by the chassis manufacturer.
The pump system shift indicator lights in the chassis cab shall be supplied and installed by the chassis manufacturer.
The pump system shift indicator lights on the operator's panel shall be incorporated with the pump pressure governor.
9.a
Packet Pg. 372 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Pump discharge; shown with four daylight bright LED digits more than 1/2" high Pump Intake; shown with four daylight bright LED digits more than 1/2" high Pressure/RPM setting; shown on a dot matrix message display Pressure and RPM operating mode LEDs
Throttle ready LED
Engine RPM; shown with four daylight bright LED digits more than 1/2" high Check engine and stop engine warning LEDs
Oil pressure; shown on a dual color (green/red) LED bar graph display Engine coolant temperature; shown on a dual color (green/red) LED bar graph display Transmission Temperature: shown on a dual color (green/red) LED bar graph display Battery voltage; shown on a dual color (green/red) LED bar graph display High battery voltage
Low battery voltage (engine running)
High transmission temperature
Low engine oil pressure
High engine coolant temperature
Out of water (visual alarm only)
No engine response (visual alarm only)
PRESSURE GOVERNOR
A Fire Research InControl series TGA400 pressure governor and monitoring display kit shall be installed. The kit shall include a control module, intake pressure sensor, discharge pressure sensor, and cables. The control module case shall be waterproof and have dimensions not to exceed 5 1/2" high by 10 1/2" wide by 2" deep. The control knob shall be 2" in diameter with no mechanical stops, have a serrated grip, and a red idle push button in the center. It shall not extend more than 1 3/4" from the front of the control module. Inputs for monitored information shall be a J1939 data bus or independent wiring.
The following continuous displays shall be provided:
The dot-matrix message display shall show diagnostic and warning messages as they occur. It shall show monitored apparatus information, stored data, and program options when selected by the operator. All LED intensity shall be automatically adjusted for day and night time operation.
The program shall store the accumulated operating hours for the pump and engine to be displayed with the push of a button. The kit shall monitor inputs and support audible and visual warning alarms for the following conditions:
The program features shall be accessed via push buttons and a control knob located on the front of the control panel. There shall be a USB port located at the rear of the control Inputs to the control panel from the pump discharge and intake pressure sensors shall be electrical. The discharge pressure display shall show pressures from 0 to 600 PSI.
The intake pressure display shall show pressures from -30 in. Hg to 600 PSI.
The governor shall operate in two control modes: pressure and RPM. No discharge pressure or engine RPM variation shall occur when switching between modes. A throttle ready LED shall light when the interlock signal is recognized. The governor shall start in
9.a
Packet Pg. 373 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) pressure mode and set the engine RPM to idle. In pressure mode, the governor shall automatically regulate the discharge pressure at the level set by the operator. In RPM mode, the governor shall maintain the engine RPM at the level set by the operator except in the event of a discharge pressure increase. The governor shall limit a discharge pressure increase in RPM mode to a maximum of 30 PSI. Other safety features shall include recognition of no water conditions with an automatic programmed response and a push button to return the engine to idle.
An interlock system shall be provided to prevent advancement of the engine speed at the pump operator’s panel unless the apparatus has “Throttle Ready” indication.
The pressure governor, monitoring and master pressure display shall be programmed to
INTAKE RELIEF VALVE
A Task Force Tips, model #A1850, pressure relief valve shall be installed on the suction side of the pump. The valve shall be factory preset and shall have an easy to read adjustment range from 90 to 300 PSI with easy to read 90, 125, 150, 200, 250, 300 PSI settings and an “OFF” position. Pressure adjustment can be made utilizing a 1/4" hex key, 9/16” socket or 14mm socket. For corrosion resistance the cast aluminum valve shall have a 2-1/2" male Victaulic discharge outlet. The valve shall be in accordance with NFPA, current edition. requirements for pump inlet relief valves. The unit shall be
TRIDENT PRIMING PUMP
The priming pump shall be a Trident Emergency Products three-barrel, compressed air parts of the priming system are to be of brass and stainless steel construction. A pressure protection valve shall be installed with the priming pump. A single panel mounted control shall activate the priming pump and open the priming valve to the pump.
MASTER DRAIN VALVE
A Trident manifold drain valve assembly shall be supplied. This drain shall provide the capability to drain the entire pump by turning a single control. The valve assembly shall consist of a stainless steel plate and shaft in a bronze body with multiple ports. The drain valve control shall be mounted on the driver's side pump panel and labeled "Master Drain".
WATEROUS OVERHEAT PROTECTION MANAGER WITH INDICATOR LIGHTS AND BUZZER
A Waterous Overheat Protection Manager (OPM) shall be installed on the pump. The relief valve shall automatically relieve water from the pump when the temperature of the pump water exceeds 140°F. In addition, a warning light on the pump panel shall be triggered by a thermal switch when the water in the pump reaches 180°F. The warning light and a buzzer act as additional protection devices if the temperature inside the pump keeps rising although the valve is open. The valve shall automatically reset after activation.
9.a
Packet Pg. 374 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
PUMP PRIMED BLACK BY PUMP MANUFACTURER
The pump shall be primed black by the pump manufacturer.
The main intake(s) shall be unpainted and any auxiliary intake(s) shall be the same color as they arrived from the valve manufacturer.
PUMP MANUALS
Two (2) Pump Operation and Maintenance manuals shall be provided in digital format with the apparatus.
PUMP COOLING SYSTEM
A pump cooling system shall be provided on the apparatus. The cooling system shall keep the pump cool during long periods of pumping when water is not being discharged.
The cooling system shall also be set up in a way that the cooling system lines can be easily drained through the master pump drain.
The cooling system lines shall consist of high-temperature hose. The pump cooling lines shall be installed with one (1) line going from the discharge side of the water pump through a 3/4 in-line quarter-turn ball valve assembly up to the water tank. At the water tank, the pump cooling line shall be plumbed into a 3/4" check valve on the "Tank Fill" the cooling system is not in use. A return line from the water tank shall be plumbed into the water pump.
The pump cooling system valve shall be controlled on operators panel, and shall be clearly labeled, "Pump Cooler".
FOAM SYSTEM CLASS A
A FoamPro S1600-1 single foam system shall be installed on the apparatus. The system shall be an electronic, fully automatic, variable speed, direct injection, and discharge side foam proportioning system. The system shall be capable of handling Class A foam concentrate. The foam proportioning operation shall be based on direct measurement of shall be equipped with a control module, suitable for installation on the pump panel.
Incorporated within the motor driver shall be a microprocessor that receives input from values to ensure that the operator preset proportional amount of foam concentrate is gpm. This feature is to be engaged or disengaged with a momentary switch and will The control module shall enable the pump operator to:
Activate the foam proportioning system
9.a
Packet Pg. 375 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Select proportioning rates from 0.1% to 1.0%
if foam concentrate is not added to the tank, shut the foam concentrate pump down.
A 12-volt electric motor driven positive displacement plunger pump shall be provided.
The pump capacity shall be from 0.1 gpm to 1.7 gpm at 200 psi with a maximum operating pressure up to 400 psi. The pump shall have the capability to draw 3 feet of lift.
The system will draw a maximum of 30 amps @ 12 VDC. The motor shall be controlled by the microprocessor (mounted to the base of the pump). It shall receive signals from the control module and power the 1/2 hp electric motor in a variable speed duty cycle to ensure that the correct proportion of concentrate is injected into the water stream. A full concentrate line.
Components of the complete proportioning system as described above shall include:
Model 100 operator control module
Pump and electric motor/motor driver
Wiring harnesses
Low level tank switch
Foam injection check valve
Main waterway check valve
FOAM CELL LEVEL GAUGE
One (1) Fire Research, model WLA360-A00, TankVision Pro 300 foam tank level gauge shall be provided on the pump operator's control panel.
The gauge shall have nine (9) super bright RGB LEDs to show the tank volume. The display shall use a two-dimensional, two-element lens to refract the light from the LEDs to provide full 180° visibility for the level indication. The gauge shall use a pressure transducer installed near the bottom of the foam tank to determine the correct volume in when the tank volume is at 1/4 tank or less and use down scrolling LEDs to alert the pump operator when the tank is almost empty.
The gauge shall have a label that indicates it is for the foam cell that contains Class "A" foam.
FOAM PROPORTIONING SYSTEM TESTING
accordance with NFPA, current edition.
PLUMBING MANIFOLD
The plumbing manifold shall consist of the inlet side manifold and the discharge side manifold. Galvanized Victaulic couplings shall be used wherever possible for ease of maintenance and superior corrosion protection.
The inlet side of the plumbing manifold shall utilize schedule 10, 304-grade stainless
9.a
Packet Pg. 376 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) steel tubing and preformed elbows for inlets that are larger than 3". Side auxiliary inlets that are 3" or smaller shall utilize schedule 40, 304-grade stainless steel threaded tubing and preformed elbows. The inlet manifold shall thread into the pump auxiliary inlet ports and each inlet valve shall thread onto the inlet manifold.
The discharge side of the plumbing manifold shall utilize schedule 40, 304-grade stainless steel tubing and preformed elbows to ensure the quality of the manifold where welds are required. The discharge manifold shall connect to the pump discharge ports leak proof seal. Each discharge shall derive from a port on the manifold assembly that terminate in a location other than the pump module (i.e. rear discharges) that do not module.
INNOVATIVE CONTROLS DISCHARGE GAUGES - 2-1/2" - 0-400 PSI The discharge gauges on the apparatus shall be 2-1/2" (63mm) diameter Innovative Controls TC Series (Temperature Compensation) pressure gauges. The gauges shall shock and vibration, lubricate the internal mechanisms, prevent lens condensation, and ensure proper operation from –40° F to +160° F.
The gauges shall meet or exceed ASME B40.100 Grade B requirements with an accuracy of +/- 1.5% full scale and include an internal thermal expansion bladder that include a KEM-X Socket Saver diaphragm in the stem to eliminate freeze-up and contain chrome-plated Smeal decorative bezel that features an area for the installation of a discharge color-coding label.
The gauges shall display a range from 0 to 400 PSI with black markings on a white dial.
The test port manifold shall be from Innovative Controls and feature solid one-piece cast brass manifold construction located on the pump operator's panel. Removable chrome plated plugs shall be in two test ports, which shall protrude through the surface of the apparatus pump panel or subpanel for easy removal during manual pressure testing.
Plumbing ports 1-4 shall be behind the panel after installation. Each of these four ports and be plumbed as needed into the vacuum and pressure lines and gauges. real-time vacuum and/or pressure readings from one or both sides of the manifold. Port 5 shall be on the vacuum side and Port 6 shall be on the pressure side of the manifold.
The location of these ports shall allow the manifold to totally drain if desired.
The test port manifold may be assembled to a decorative chrome-plated die-cast zinc bezel. This bezel shall reside on the outside of the panel after installation and hold a
9.a
Packet Pg. 377 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) sub-surface printed polycarbonate overlay that will label each of the two exposed test ports – one shall be labeled ‘Vacuum’ or ‘VAC’ and the other ‘Pressure’ or ‘PRES’. This label shall cover the mounting screws and include a Spartan logo.
HARDWARE BRAND
Park Corp. Brand, if available. We reserve the right to change the brand of adapters to manufactured from high-quality brass that shall be polished to remove manufacturing Tips Brand. For corrosion resistance, the adapter shall be constructed of hard coat anodized aluminum alloy and include a polymer bearing ring for prevention of galvanic corrosion.
The auxiliary intake(s) shall terminate with NH swivels, and the discharges shall terminate with male NH threads.
DISCHARGE, PRE-CONNECT, AND INTAKE DRAINS (SPARTAN)
An Innovative Controls 3/4" quarter turn drain, shall be included on each discharge, gated intake, and steamer valve (if applicable). A side stem, long stroke chrome plated lift handle shall be provided on the drain valve to facilitate use with a gloved hand. The drain valve shall have a verbiage tag that angles upward so that it can easily be seen and read by the operator before opening. The drain valve shall be located just above the running board and below the pump panel to reduce clutter in the pump panel area. The manner as to assure complete drainage to below the apparatus. A matching color coded bezel shall be included.
AUTOMATIC DRAINS
A Class 1 automatic drain shall be installed on the deluge valve (if applicable). The drains shall also be located in low laying areas (i.e., front discharge) The Drains will open whenever the pressure in the line drops below 6 PSI.
All poly lines leading to the pressure gauges, drains, etc. in relation to the water pump 2" TANK FILL
with 2" rubber hose and stainless steel hose couplings.
An Akron Brass, model 8820, 2" Swing-Out valve shall be provided. The valve shall have stainless steel ball. The valve shall not require lubrication of seats or any other internal waterway parts, and must be capable of swinging out of the waterway for maintenance by the removal of six bolts. The valve shall be actuated by a manual actuator installed on
9.a
Packet Pg. 378 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) the valve. The manual actuator shall be controlled by a Spartan Style Innovative Controls push/pull T-handle.
The valve shall carry a ten (10) year warranty by the valve manufacturer. 3" TANK-TO-PUMP
of the pump. An Akron Brass, model 8830, 3" Swing-Out valve shall be provided. The self-locking ball feature using an automatic friction lock design and specially designed other internal waterway parts and must be capable of swinging out of the waterway for maintenance by the removal of six bolts. The valve shall also include a necessary B3-SH properly adjust the plumbing based on the pitch of the pump. The valve shall carry a ten (10) year warranty by the valve manufacturer.
A check valve shall be between the pump suction and the booster tank valve. The check pressurized source.
The valve shall be actuated by a manual actuator. The manual actuator shall be controlled by a Spartan Style Innovative Controls push/pull T-handle. 6" DRIVER SIDE MAIN INTAKE
A 6" main intake shall be located on the driver's side of the pump module. The suction pump thus reducing corrosion. A short steamer barrel shall be installed to accommodate an intake valve without exceeding the legal overall body width. The intake shall terminate male NH threads.
2-1/2" DRIVER'S SIDE AUXILIARY INTAKE
A 2-1/2" gated auxiliary intake with 2-1/2" plumbing shall be provided on the driver's side of the pump module. The auxiliary intake shall be fully recessed behind the panel in order to keep the valve protected from the elements.
An Akron Brass, model 8825, 2-1/2" Swing-Out valve shall be provided. The valve shall seats or any other internal waterway parts and must be capable of swinging out of the waterway for maintenance by the removal of six bolts. The valve shall be manufactured and assembled in the United States. The valve shall carry a ten (10) year warranty by the valve manufacturer.
The valve shall be actuated by an Akron Brass, model TS manual actuator installed directly on the valve. The handle shall allow the valve to be controlled directly at the valve.
9.a
Packet Pg. 379 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) One (1) 2-1/2" NH thread rocker lug chrome plated vented plug, complete with cable or chain, shall be provided.
6" OFFICER SIDE MAIN INTAKE
pump thus reducing corrosion. A short steamer barrel shall be installed to accommodate an intake valve without exceeding the legal overall body width. The intake shall terminate male NH threads.
2-1/2" DRIVER'S SIDE DISCHARGE
A 2-1/2" discharge with 2-1/2" plumbing shall be located on the driver's side of the pump compartment. The discharge shall terminate with male NH thread.
An Akron Brass model 8625 2-1/2" Swing-Out valve shall be provided. The valve shall seats or any other internal waterway parts and must be capable of swinging out of the waterway for maintenance by the removal of six bolts. The valve shall be manufactured and assembled in the United States. The valve shall carry a ten (10) year warranty by the valve manufacturer.
The valve shall be actuated by an Akron Brass rack and sector actuator installed on the valve. The manual actuator shall be controlled by a Spartan style Innovative Controls push/pull T- handle.
with a Spartan bezel and a display range from 0 to 400 PSI. The gauge shall have a black dial graphic and pointer.
One (1) 2-1/2" female NH thread swivel rocker lug x 2-1/2" male NH thread 30 degree chrome plated elbow adapter shall be provided.
One (1) 2-1/2" NH thread rocker lug chrome plated vented cap, complete with cable or chain, shall be provided.
2-1/2" DRIVER'S SIDE DISCHARGE
A 2-1/2" discharge with 2-1/2" plumbing shall be located on the driver's side of the pump compartment. The discharge shall terminate with male NH thread.
An Akron Brass model 8625 2-1/2" Swing-Out valve shall be provided. The valve shall seats or any other internal waterway parts and must be capable of swinging out of the waterway for maintenance by the removal of six bolts. The valve shall be manufactured and assembled in the United States. The valve shall carry a ten (10) year warranty by the valve manufacturer.
9.a
Packet Pg. 380 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The valve shall be actuated by an Akron Brass rack and sector actuator installed on the valve. The manual actuator shall be controlled by a Spartan style Innovative Controls push/pull T- handle.
with a Spartan bezel and a display range from 0 to 400 PSI. The gauge shall have a black dial graphic and pointer.
One (1) 2-1/2" female NH thread swivel rocker lug x 2-1/2" male NH thread 30 degree chrome plated elbow adapter shall be provided.
One (1) 2-1/2" NH thread rocker lug chrome plated vented cap, complete with cable or chain, shall be provided.
2-1/2" OFFICER'S SIDE DISCHARGE
compartment. The discharge shall terminate with male NH thread.
An Akron Brass, model 8825, 2-1/2" Swing-Out valve shall be provided. The valve shall seats or any other internal waterway parts and must be capable of swinging out of the waterway for maintenance by the removal of six bolts. The valve shall be manufactured and assembled in the United States. The valve shall carry a ten (10) year warranty by the valve manufacturer.
The valve shall be actuated by a manual actuator installed on the valve. The manual actuator shall be controlled by a Spartan style Innovative Controls push/pull T- handle at the pump operator's panel.
with a Spartan bezel and a display range from 0 to 400 PSI. The gauge shall have a black dial graphic and pointer.
One (1) 2-1/2" female NH thread swivel rocker lug x 2-1/2" male NH thread 30 degree chrome plated elbow adapter shall be provided.
One (1) 2-1/2" NH thread rocker lug chrome plated vented cap, complete with cable or chain, shall be provided.
4" OFFICER'S SIDE DISCHARGE
the pump compartment. The discharge shall terminate with male NH thread.
An Akron Brass, model 8830, 3" Swing-Out valve shall be provided. The valve shall have other internal waterway parts and must be capable of swinging out of the waterway for
9.a
Packet Pg. 381 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) maintenance by the removal of six bolts. The valve shall be manufactured and assembled in the United States. The valve shall carry a ten (10) year warranty by the valve manufacturer.
The valve shall be actuated by a manual actuator installed on the valve. The manual actuator shall be controlled by an Innovative Controls push/pull T- handle at the pump operator's panel.
with a Spartan bezel and a display range from 0 to 400 PSI. The gauge shall have a black dial graphic and pointer.
One (1) 4" female NH thread swivel rocker lug x 4" male NH thread 30 degree chrome plated elbow adapter shall be provided.
One (1) 4" NH thread rocker lug chrome plated vented cap, complete with cable or chain, shall be provided.
2-1/2" FRONT BUMPER DISCHARGE
A 2-1/2" discharge shall be located above the gravel shield on the driver's side of the front bumper. The discharge shall be plumbed with 2-1/2" chassis installed stainless with stainless steel couplings. The discharge shall terminate in male NH thread.
The discharge shall have Class1 automatic drains installed in the low routed areas below the manual drain. The automatic drains shall open whenever the pressure in the line drops below 6 PSI.
The discharge shall be foam capable.
An Akron Brass, model 8825, 2-1/2" Swing-Out valve shall be provided. The valve shall seats or any other internal waterway parts and must be capable of swinging out of the waterway for maintenance by the removal of six bolts. The valve shall be manufactured and assembled in the United States. The valve shall carry a ten (10) year warranty by the valve manufacturer.
The valve shall be actuated by a manual actuator installed on the valve. The manual actuator shall be controlled by a Spartan Style Innovative Controls push/pull T-handle. with a Spartan bezel and a display range from 0 to 400 PSI. The gauge shall have a black dial graphic and pointer.
The discharge shall be designated as a pre-connect so no cap and chain shall be required.
9.a
Packet Pg. 382 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
CROSSLAY CONFIGURATION
Two (2) 1-1/2" and one (1) 2-1/2" crosslay pre-connects shall be located above the front hose with stainless steel couplings shall be used in the plumbing.
A 90 degree swivel elbow shall be utilized to keep the hose from kinking when pulled from either side of the apparatus. The swivel for each crosslay shall be located outboard for ease of making connections while changing hose.
The pre-connect hose beds shall be sized to accommodate the following hose load capacity:
FLOORING
material. The Dura-Dek shall have "T" beams in parallel connected with cross slats that apart to allow for drainage and ventilation.
ROLLERS
Stainless steel rollers shall be provided at each end of the crosslay hose bed to facilitate deployment of hose. Vertical rollers shall be installed on each side of the hose bed opening and a horizontal roller shall be installed under the opening.
DIVIDERS
Two (2) dividers shall be in the crosslay area. Each divider shall be fabricated of 3/16" aluminum with a handheld cutout and shall be mounted in a channel on each end for
TOP / END COVERS
The top and/or end covers shall be provided and installed by the dealer/Customer. The customer shall sign a statement of exceptions.
Two (2) Spartan/Smeal, crosslay hose bed lights shall be provided to illuminate of the crosslay hose bed area in accordance with NFPA, current edition. The lights shall be a 9" tube light with a chrome housing. The lighting circuit shall be activated when the parking brake is engaged.
1-1/2" PRE-CONNECT
A 1-1/2" pre-connect with 2" plumbing shall be provided. The pre-connect shall terminate out a swivel male NST threads.
The 1-1/2" crosslay pre-connect shall be sized to accommodate 250' of 1-3/4" double All hose load capacity calculations are estimated using Snap-Tite standard hose.
The discharge shall be foam capable.
9.a
Packet Pg. 383 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) An Akron Brass, model 8820, 2" Swing-Out valve shall be provided. The valve shall have other internal waterway parts and must be capable of swinging out of the waterway for maintenance by the removal of six bolts. The valve shall be manufactured and assembled in the United States. The valve shall carry a ten (10) year warranty by the valve manufacturer.
The valve shall be actuated by a manual actuator installed on the valve. The manual actuator shall be controlled by a Spartan style Innovative Controls push/pull T- handle. with a Spartan bezel and a display range from 0 to 400 PSI. The gauge shall have a black dial graphic and pointer.
The discharge shall be designated as a pre-connect so no cap and chain shall be required.
1-1/2" PRE-CONNECT
A 1-1/2" pre-connect with 2" plumbing shall be provided. The pre-connect shall terminate out a swivel male NST threads.
The 1-1/2" crosslay pre-connect shall be sized to accommodate 250' of 1-3/4" double All hose load capacity calculations are estimated using Snap-Tite standard hose.
The discharge shall be foam capable.
An Akron Brass, model 8820, 2" Swing-Out valve shall be provided. The valve shall have other internal waterway parts and must be capable of swinging out of the waterway for maintenance by the removal of six bolts. The valve shall be manufactured and assembled in the United States. The valve shall carry a ten (10) year warranty by the valve manufacturer.
The valve shall be actuated by a manual actuator installed on the valve. The manual actuator shall be controlled by a Spartan style Innovative Controls push/pull T- handle. with a Spartan bezel and a display range from 0 to 400 PSI. The gauge shall have a black dial graphic and pointer.
The discharge shall be designated as a pre-connect so no cap and chain shall be required.
9.a
Packet Pg. 384 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) 2-1/2" PRE-CONNECT
A 2-1/2" pre-connect with 2-1/2" plumbing shall be provided. The pre-connect shall terminate out a swivel NST.
The 2-1/2" crosslay pre-connect shall be sized to accommodate 250' of 2-1/2" double All hose load capacity calculations are estimated using Snap-Tite standard hose.
The discharge shall be foam capable.
An Akron Brass, model 8825, 2-1/2" Swing-Out valve shall be provided. The valve shall seats or any other internal waterway parts and must be capable of swinging out of the waterway for maintenance by the removal of six bolts. The valve shall be manufactured and assembled in the United States. The valve shall carry a ten (10) year warranty by the valve manufacturer.
The valve shall be actuated by a manual actuator installed on the valve. The manual actuator shall be controlled by a Spartan Style Innovative Controls push/pull T-handle. with a Spartan bezel and a display range from 0 to 400 PSI. The gauge shall have a black dial graphic and pointer.
The discharge shall be designated as a pre-connect so no cap and chain shall be required.
AERIAL WATERWAY DISCHARGE
A discharge shall be plumbed to the aerial waterway with 4" plumbing. The plumbing shall be constructed from schedule 10 stainless steel components.
An Akron Brass, model 8940, 4" Swing-Out valve shall be provided. The valve shall have technology. The valve shall not require lubrication of seats or any other internal waterway parts, and must be capable of swinging out of the waterway for maintenance by the removal of four bolts. The valve shall carry a ten (10) year warranty by the valve manufacturer.
The valve shall be actuated by an Akron Brass electric actuator installed on the valve.
The electric actuator shall have a 25:1 gear ratio, which actuates from fully open to fully close in eight (8) seconds, a clutchless motor, and utilizes an electric controller with current limiting design.
The electric actuator shall be controlled by an Akron Brass electric valve controller. The electric controls shall be of true position feedback design, requiring no clutches in the motor or current limiting. The unit shall be completely sealed with momentary open, close as well as an optional one (1) touch full open feature to operate the actuator. Two (2) additional buttons shall be available to be used for preset selection, preset activation
9.a
Packet Pg. 385 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) and menu navigation. The controller shall have up to three (3) preset locations that can be user set and easily recalled upon each use. The unit shall be capable of being used in conjunction with at least two (2) additional displays to control one (1) valve. The unit shall provide position indication through a full-color backlit LCD display. The display shall be a full-color LCD display with a backlight. It shall have manual adjustment of the brightness as well as an auto-dimming option. The display banner color and custom text shall be programmed to mirror the the signed order form (the color and verbiage may not with a Spartan bezel and a display range from 0 to 400 PSI. The gauge shall have a black dial graphic and pointer.
WATERWAY FLOW METER
The Flowminder shall have a LED display to indicate the volume of water being discharged. The display shall be weatherproof. The Flowminder shall be located at the pump panel.
ELECTRICAL SYSTEM
apparatus, and shall meet the following criteria. Under no circumstances shall diodes, resistors, or fusible links be located within the wiring harness. All such components shall be located in an easy to access wiring junction box or the main circuit breaker area. All Society of Automotive Engineers recommended practices. It shall be stranded copper J1128. Each wire shall be hot stamp function coded every three inches starting one inch from the end and continuing throughout the entire harness. In addition to function coding, each wire shall be numbered, colored, and gauge coded.
Wire harnesses shall be protected by 275 degree Fahrenheit minimum high temperature Harnesses shall be modular in design; main harness system subdivided into several smaller sub-harnesses. The harness subsections shall be connected using Deutsch branded, heavy duty, environmentally sealed, connectors with silicone seals and a rear insertion/removal contact system. For isolation of electrical "zones" the harness subsections shall consist of a main harness, a pump harness with a separate pump gauge panel harness, a left body harness with a separate left compartment harness, a right body harness with a separate right compartment harness, and a rear body harness with two separate rear compartment harnesses.
The main harness and three body harnesses shall interconnect at a central, easy to reach location and their connectors shall not be obstructed by other harnesses or fuel/air lines. In addition, the main and body harness connectors shall be color-coded for ease of Where connectors are not provided by the electrical component manufacturer, all 12-volt lights and other electrical components (excluding rocker and toggle switches) shall connect to the harnesses using Deutsch brand connectors; butt connectors are
9.a
Packet Pg. 386 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) All connectors shall be rated for three feet submersion in water.
Temperature range from -67° F to 257° F continuous at rated current.
All contacts shall be soldered unless a crimping tool or machine is used that gives an even and precise pressure for the terminal being used.
All contacts shall be pull-tested to ensure their integrity. considered unacceptable.
All Deutsch connectors shall meet the following criteria:
WEATHERPROOF DOOR SWITCHES
The switches shall be used for activation of the compartment lights and to provide a signal to the door open circuit in the cab.
ELECTRICAL MANAGEMENT SYSTEM
to multiplexing, one is to reduce the number of connections in a vehicle's electrical system, because of this it is important to limit the amount of modules that control certain functions of the vehicle.
Outputs:
The outputs shall perform all the following items without added modules to perform any of the tasks:
9.a
Packet Pg. 387 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Load Shedding: The System shall have the capability to Load Shed with 8 levels any output. This means you can specify which outputs (barring NFPA restrictions) you would like Load Shed. Level 1 - 12.9v, Level 2 - 12.5V, Level 3 - 12.1V, Level 4 -
11.7V, Level 5 - 11.3V, Level 6 - 10.9V, Level 7 - 10.5, Level 8 - 10.1. Unlike conventional load shedding devices you can assign a level to any or all outputs. No add-on modules shall be acceptable; the module with the outputs must perform this function.
Load Sequencing: The System shall be able to sequence from 0 8 levels any output.
With 0 being no delay and 1 being a 1-second delay, 2 being a 2-second delay and so on. Sequencing reduces the amount of voltage spikes and drops on your vehicle, and can help limit damage to your charging system. No add-on modules shall be acceptable; the module with the outputs must perform this function.
Output Device: The System shall have solid-state output devices. Each solid-state MOS-FETs are solid-state devices with no moving parts to wear out. A typical relay, when loaded to spec, has a life of 100,000 cycles. The life of a FET is more than 100 times that of a relay. No add-on modules shall be acceptable; the module with the outputs must perform this function.
and logic is used to shut down needed outputs in park, or any one of several Flashing outputs can also be used to warn of problems. No add-on modules shall be acceptable; the module with the outputs must perform this function.
PWM: The modules shall have the ability to PWM at some outputs so that a Headlight PWM module is not needed. No add-on modules shall be acceptable; the module with the outputs must perform this function.
Diagnostics: An output shall be able to detect either a short or open circuit.
Inputs:
The inputs shall have the ability to be switched by a ground or battery signal. or dirty power will not trick an input into changing its status.
System Network:
The Multiplex system shall contain a Peer-to-Peer network. A Master-Slave Type network is not suitable for the Fire/Rescue industry. A Peer-to-Peer network means that all the modules are equal on the network; a Master is not needed to tell other nodes when to talk.
System Reliability:
The Multiplex system shall be able to perform in extreme temperature conditions, from -40° to +85° C (-40 degree to +185 degree Fahrenheit) The system shall be sealed locations or compartments around the vehicle. The modules shall be protected from over voltage and reverse polarity.
9.a
Packet Pg. 388 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Reserve capacity test
Alternator performance test at idle
Alternator performance test at full load
Low voltage alarm test
12-VOLT SYSTEMS TEST
After completion of the unit, the 12-volt electrical system shall undergo a battery of tests as listed in NFPA, current edition. These tests shall include, but not be limited to:
One (1) red LED stop/tail combination light with clease lens One (1) amber LED turn light with arrow with clear lens One (1) clear LED backup light
TAIL LIGHTS
A Whelen M6 series LED tail light assembly shall be installed on each side of the rear of the apparatus. Each assembly shall include the following:
REAR WORK LIGHT SWITCH
A switch shall be installed above the tail light bezel on the left side of the rear of the apparatus. The switch shall be wired to the backup lights to provide additional work lighting. The rear work light circuit shall be deactivated when the park brake is disengaged. In addition to the lights being activated by the above switch, the lights shall also come on when the transmission is placed in reverse.
MIDSHIP TURN SIGNALS
Two (2) Tecniq model S170 midship auxiliary/turn signal lights shall be installed in the rub rail, one (1) on each side of the body. Each light shall have amber LEDs and clear lens.
PERIMETER GROUND LIGHTING
Tecniq, model T44-WD0B-1, 4" round LED lights shall be installed beneath the The lights shall illuminate the ground within 30" of the apparatus to provide visibility of any obstructions or hazards. These areas shall include, but not be limited to, side running boards and the rear step area.
The lights activation shall match the chassis programming. The lights will be tied into the chassis ground light activation. All the body ground lights around the entire perimeter of the truck swill activate at the same time. Activation of the left and right side ground lights are not independent from each other.
CLEARANCE LIGHTS
Seven (7) Tecniq S170 red LED clearance lights with chrome bezels shall be installed in outboard corners and (3) centered at the rear.
9.a
Packet Pg. 389 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Two (2) additional Tecniq lights shall be located as high and wide as possible on the rear of the apparatus.
On the sides of the apparatus there shall be two (2) lights located in each set of rub rails on the body. One (1) forward and one (1) rearward.
Each S170 light shall have red LEDs and clear lens.
applicable ICC and DOT codes and regulations.
Two (2) extension marker lights (rubber arm style) shall be installed at the rear portion of lights shall aid the driver as to the location of the rear of the body during driving operations. The lights shall have forward facing amber bulbs and rearward-facing red bulbs.
CHASSIS SUPPLIED BACK UP CAMERA SYSTEM
A backup camera system shall be installed in the cab with the chassis. The camera shall be installed on the rear center upper portion of the apparatus.
DOOR OPEN AUDIBLE ALARM
An audible alarm shall be provided and connected to the door open circuitry.
UPPER ZONE A
The upper zone A warning lights shall be supplied and installed by the chassis manufacturer.
DIMMING FEATURE
The body warning lights to be wired into the chassis warning light dimming feature.
The side and rear warning lights shall be controlled through a chassis supplied virtual button on the vehicle display and control screen.
The warning light dimmer will automatically reduce the brightness of the warning lights with Multiplex display screen "Dim" or "Night" dimmer setting and with the park brake set.
Some lights do not have the dimming capability and will be omitted from the programming. This option is for Whelen 12v lighting only.
The dealer is responsible to ensure the proper chassis option(s) (Ref. 5422-020), to be compatible with this option are selected or they will be subject to a charge for the additional costs.
UPPER ZONE C
installed in Upper Zone C, on the upper rear face of the apparatus. The warning lights
9.a
Packet Pg. 390 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) shall consist of eighteen (18) clear Super-LED’s and a clear optic polycarbonate lens.
The warning lights, with the aid of two screws, shall have the ability to be installed as a surface mount warning lights.
including a variety of CA Title 13 compliant patterns, left/right, top/bottom, in/out, and steady burn. The lights shall also provide synchronize and low power features. The M6 other environmental conditions. The hard coated lens shall provide extended life/luster protection against UV and chemical stresses. The light engine shall be installed at the rear of the unit and be vacuum tested to ensure proper sealing. The PC board shall be conformal coated for additional protection.
UPPER ZONE B/D SIDE WARNING LIGHTS
Four (4) Whelen ION -T Series red LED lights with clear lens and chrome housings shall be installed, two (2) each in Upper Zone B and Upper Zone D. The T-Series lights shall be capable of dimming should the dimming option be selected. The lights shall be compliant with NFPA KKK1822F requirements. The hard coated lens shall provide extended life/luster protection against UV and chemical stresses. The conformal coated PC board and liquid injection molded lens/gasket assembly shall provide additional protection against environmental elements. The solid state warning lights shall be vibration resistant.
The light will have red LED's with clear lens and chrome bezel.
LOWER ZONE WARNING LIGHT PACKAGE
Four (4) Whelen T-Series Series Super-LED lights with chrome housing shall be installed in the lower zones B & D of the apparatus to be in accordance with NFPA, current edition compliance. The T-Series lights shall have the capability of dimming should the dimming option be selected.
taillight cluster bezel) shall be installed in the lower zone C of the apparatus to be in accordance with NFPA, current edition compliance.
The lights shall have red LEDs and Clear Lenses.
INSTALL CHASSIS SUPPLIED TA
omitted.
9.a
Packet Pg. 391 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
AIR HORN ACTIVATION
One (1) air horn button shall be provided on the driver's side pump panel. The button shall be red in color and include a label reading "AIR HORN".
WHELEN 12 VOLT SURFACE MOUNT SCENE LIGHT
Two (2) Whelen, model PCPSM2, Pioneer Plus Super-LED lights shall be installed on the apparatus. The 154 watt +12v DC single panel Pioneer light head shall incorporate current and ream-up time. Correlated color temperature simulates bright midday light.
16.22" wide by 6.38" high by 1.73" deep. The PCPSM2 combination optic design projects light directly down at 5° and producing illumination to the side of the vehicle arching upward to a 90° pattern of light.
The two (2) lights shall be installed on the side face of the body in the center, one (1) on each side.
on the vehicle display in the chassis cab. One (1) rocker switch shall be located on the pump panel for each side of scene lights, for a total of two (2). The switch at the pump panel shall have an indicator that shall illuminate when the switch is in the “ON” position.
The activation for the driver's side scene lights on the vehicle display and the pump "RIGHT SCENE."
WHELEN 12 VOLT SURFACE MOUNT SCENE LIGHT
Two (2) Whelen, model PCPSM1, Pioneer Plus Super-LED lights shall be installed on the apparatus. The 76 watt +12v DC single panel Pioneer light head shall incorporate current and ream-up time. Correlated color temperature simulates bright midday light. wide by 6.38" high by 1.73" deep. The PCPSM1C combination optic design projects light directly down at 5° and producing illumination to the side of the vehicle arching upward to a 90° pattern of light.
The two (2) lights shall be installed on the rear face of the body, one (1) on each side.
The rear scene light(s) shall be controlled by a switch located on the vehicle display in the chassis cab and one (1) switch located at the pump panel. The switch at the pump panel shall have an indicator that shall illuminate when the switch is in the “ON” position.
9.a
Packet Pg. 392 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The activation on the vehicle display and the pump panel switch shall be labeled "REAR SCENE."
Base Section - 40.250"
First Fly Section - 33.500"
Second Fly Section - 27.750"
Last Fly Section - 22.500"
107 AERIAL LADDER CONSTRUCTION STANDARDS
The aerial ladder shall be a rear mount design with the ladder extending toward the front of the apparatus when stowed. The aerial ladder shall be comprised of four sections and shall extend to a nominal height of 107 feet at 72 degrees, measured in a vertical plane from the top rung to the ground. To maintain a maximum level of safety, units exceeding a 76 degree angle of inclination, in accordance with NFPA, current edition, shall not be acceptable.
OPERATIONAL ENVELOPE/REACH
The aerial ladder shall have an operations range of negative 8 degrees elevation to positive 72 degrees elevation.
A minimum horizontal reach of 101’-5” shall be measured from the turntable centerline to degrees elevation.
STRUCTURAL MATERIAL
100,000 PSI yield strength (minimum) steel tubing, with full traceability on all structural materials. Each section shall be trussed diagonally, vertically, and horizontally using welded steel tubing. All critical points shall be reinforced for extra rigidity and to provide a high strength to weight ratio.
A370 standards. A606 Type 4 exhibits superior corrosion resistance over regular carbon 4 shall meet a minimum 6.0 Atmospheric Corrosion Factor. The ladder rungs shall be round and welded to each section utilizing "K" bracing for torsional rigidity.
All welding of structural components, including the aerial ladder sections, turntable, pedestal, and outriggers, will be in compliance with the American Welding Society by vendors other than the mill they were manufactured at will not be acceptable. Any component for the ladder will be traceable to their mill lots.
PRIMARY DIMENSIONS
The inside dimensions of the ladder shall be as follows:
9.a
Packet Pg. 393 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Base Section - 28.875"
First Fly Section - 24.875"
Second Fly Section - 21.375"
Last Fly Section - 17.375"
The height of the handrails above the center line of the rungs shall be as follows:
NFPA SAFETY FACTOR AND RATED CAPACITIES
determine the preceding and following Safety Factor and Rated Capacity of the aerial tests.
AERIAL DEVICE SAFETY FACTOR AND RATED CAPACITY
minimum 2.0:1 safety factor as required and in accordance with NFPA, current edition.
Therefore, the aerial manufacturer shall hereby certify, by submitting a bid for these The design stress or primary stress within all structural load supporting members of the aerial device shall not exceed 50% of the minimum as welded yield strength of the material based on the combination of the dead load of the aerial plus the rated capacity ladder centerline; with the structural load supporting members of the aerial device at either; an ambient temperature of 75 degrees F or an elevated temperature of 350 degrees F- thereby exhibiting a minimum 2.0:1 safety factor in all feasible operational conditions.
These capabilities shall be valid and true when the apparatus is deployed in the from full retraction to full extension, and at any degree of elevation (-8 to +72). In order to provide a clear picture of apparatus capabilities, any manufacturer with any restrictions
AERIAL DEVICE SAFETY FACTOR SERVICE LIFE
The purchaser desires to purchase an aerial device with a safety factor that remains NFPA compliant and constant throughout the life of the aerial device. The safety factor of every structural load bearing member in the aerial device shall remain above 2.0:1 for a "Safety Factor Service Life" of up to 20 years minimum. Any apparatus claiming to
AERIAL SPECIAL LABELS
Legible, permanent signs shall be installed in positions readily visible to the operator to provide operational directions, warnings, and cautions. The signs shall describe the function of each control and provide operating instructions.
Warning and caution signs shall indicate hazards inherent in the operation of the aerial device. These hazards shall include, but shall not be limited to:
9.a
Packet Pg. 394 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Electrical hazards involved where the aerial device does not provide protection to the personnel from contact with, or near proximity to, an electrically charged conductor.
Electrical hazards involved where the aerial device does not provide protection to ground personnel who might contact the vehicle when in contact with energized electrically charged conductors.
Hazards from stabilizer motion.
Hazards that can result from failure to follow the manufacturer's operating instructions.
AERIAL DEVICE SERIAL NUMBER PLATE
A permanent label shall disclose the following information relative to the aerial device (See turntable console lid):
Model
Serial number
Shop Order Number
OTHER LABELS
Maximum hydraulic system pressure
Hydraulic oil type
All other appropriate labels to ensure safe operation of the aerial device shall be supplied in conspicuous locations.
THIRD PARTY NON-DESTRUCTIVE TESTING
Welds shall be tested using two (2) non-destructive methods by an independent third manufacturer shall not be acceptable. Welds shall be tested using two-(2) non-ladders shall, at a minimum, have all welds tested using two-(2) separate NDT methods.
Aerial structures shall have 100 % of all structural welds tested using both magnetic particle method and visual testing method. Aerials that are fabricated of aluminum shall have 100% of all structural welds tested using dye penetrate method and visual method.
Manufacturers who rely only on visual inspection, performed in-house or by a third party, as a primary method of testing shall not be considered, and their bid shall be rejected.
STRUCTURAL SAFETY FACTOR
The purchaser desires a device that has been tested by a third party for compliance with
NFPA AERIAL STABILITY FACTOR AND TESTING
9.a
Packet Pg. 395 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) A one and one-half to one (1.5:1) stability factor shall be provided. These capabilities waterway and water reactionary force as required by NFPA, current edition. they shall be performed under, and strictly adhered to by the aerial manufacture set forth For both of the following tests, the only obstructions to a full 360-degree rotation with the aerial at 0 degrees elevation and full extension; shall be presented by the apparatus itself, and not external obstructions at the manufacturer's test location. This means that the aerial device manufacturer shall ensure that the testing grounds present no obstruction (trees, buildings, etc.) to the full 360-degree rotation at 0 degrees elevation and full extension, which may cause the need to raise the aerial to clear the obstruction.
Additionally, the apparatus shall be tested for stability only after the entire apparatus is complete. Manufacturers using a third-party to manufacture the aerial device must apparatus being in "service-ready condition". There shall be no exception to this requirement due to the fact that it would be unlikely that actual weight distribution could be accurately simulated for the stability testing.
TEST 1
following test in the presence of the third party testing company that is in compliance with the stabilizers deployed per manufacturer recommendations. The aerial device then shall have 1.5 times the rated capacity placed at the tip of the aerial, with the device at device shall be rotated 360 degrees raising and lowering the aerial as needed to clear the cab of the apparatus. The aerial shall prove to be stable during the entire test and no component of the aerial shall permanently deform.
TEST 2
following test in the presence of the third party testing company that complies with these slope with the stabilizers deployed per manufacturer's recommendations. The aerial device then shall have 1.33 times the rated capacity placed at the tip of the aerial, with the device at full extension and at 0 degrees elevation, which is the most stringent needed to clear the cab of the apparatus. The aerial shall prove to be stable during the entire test and no component of the aerial permanently deform.
RUNG COVERS
Each rung shall be covered with secure, heavy duty, deeply serrated rubber sheathing.
The rung cover shall be installed on a minimum of sixty percent (60%) of each ladder rung. Attachment of the sheathing to the rung shall be by mechanical means and an
9.a
Packet Pg. 396 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) adhesive application. Under no circumstance shall the rung covers turn when a rung is at ambient temperature (75 degrees F) or at an elevated temperature (350 degrees F); there shall be no exception to this requirement for the safety of persons climbing the ladder sections.
The sheathing shall be easily replaceable if the rubber becomes worn, however, the rung covers shall be designed, constructed, and installed with lifetime service as the objective. To ensure ease of maintenance if damaged, manufacturers using embossed metal in place of the rubber rung covers are not acceptable.
To prevent corrosion of the rungs by introducing air to the inside, under no circumstances will rung covers attached with screws or rivets be acceptable.
HEAVY DUTY LADDER TRAVEL SUPPORT
A heavy duty ladder rest with poly pads shall be provided for support of the ladder in the travel position. The location of the travel support shall be directly behind the chassis cab.
The travel support shall be fabricated from heavy duty steel and painted to match the primary body color. If the body is a two-tone design, the travel support shall be painted to match the top body color. The travel support shall be designed to be easily removable to allow for ease of maintenance and repair if necessary.
comes into contact with the ladder support.
An indicator light shall be provided on the turntable to indicate when the ladder is aligned with the travel support and may be lowered into it. The ladder rest shall be attached to the front outrigger box assembly for added stability.
The ladder rest shall be illuminated for nighttime operation. The illumination light shall automatically activate with the aerial master switch.
CRADLE INTERLOCK SYSTEM
A cradle interlock system shall be provided to prevent the lifting of the ladder from the nested position until the operator has positioned all of the stabilizers in a load supporting the stabilizers once the aerial has been elevated from the nested position.
ELEVATION SYSTEM
Two (2) double acting lift cylinders shall be utilized to provide smooth precise elevation from 8 degrees below horizontal to 72 degrees above horizontal. The lift cylinders shall have a 6" internal diameter (bore) and a 2.5" solid cylinder rod. The lift cylinders shall be equipped with integral holding valves located on the cylinder to prevent the unit from lowering should the charged lines be severed at any point within the hydraulic system.
The lowering of the ladder shall be controlled by a pressure limiting valve to limit the downward pull of the ladder when it is bedded. Both raising and lowering functions shall design speed regardless of load, angle, or extension. Ladder tip speed shall be decelerated above 65 degrees in order to reduce "tip-lash". Ladder lowering shall be controlled on the down motion to prevent the cylinders from completely retracting, thus
9.a
Packet Pg. 397 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) allowing a cushion of oil for continuous ladder load readout.
The elevation cylinder upper and lower pivot pins shall be installed with a secondary tensioning system to secure the pins and prevent them from slipping out over time. The design shall not inhibit the pins from being removed for future servicing purposes.
Cables shall have a 5:1 safety factor based on ultimate strength under all safe operating conditions.
The factor of safety shall remain above 2:1 during any extension or retraction system stall
The minimum ratio of the diameter of cable to the diameter of sheave shall be 1:12
EXTENSION/RETRACTION SYSTEM
A fully hydraulic powered extension and retraction system shall be provided using two (2) sets of Siamese hydraulic cylinders and cables. Each set shall be capable of operating the ladder in the event of a failure of the other. The extension cylinders shall each have a
3.5" internal diameter (bore) and a 1.5" diameter solid rod. Extension and retraction of the telescopic sections shall be internally limited within the cylinders, eliminating excess strain on the cables, sheaves, and ladder structure. Each of the cylinder, cable, and sheave assemblies shall be completely independent of the other, to provide a safety other. The extension cylinders shall be equipped with counterbalance holding valves to synchronize the cylinders for smoother operation and prevent the unit from retracting should the charged lines be severed at any point within the hydraulic system. The holding valves shall be mounted directly on the cylinders with no hoses between the valve and the cylinder.
The reeling of the cable shall be such to provide synchronized, simultaneous movement of all sections from full extension to full retraction. All pulleys and sheaves shall be enclosed as an added safety feature as well as to prevent personnel on the ladder from becoming entangled in them.
MAINTENANCE FREE SHEAVE BEARINGS
The aerial sheave bearings shall be made with continuous wound PTFE and high-shall be corrosion-resistant, have a high load capacity, and be self-lubricating.
It shall also be resistant to shocks, misalignment, and wear. The bearings shall not require lubrication. Aerial cable systems that require extensive maintenance, and constant lubrication, are not acceptable.
AERIAL CABLES
To ensure a maximum level of safety the following standards shall be used on the extension and retraction cable system with no exception:
minimize changes to the cable lengths and performance.
CERTIFIED CABLE SWAGED SHACKLES
9.a
Packet Pg. 398 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) assembly.
ENERGY CHAIN
The electrical cable, hydraulic hose and/or air hose shall be routed through the interior of the structural tubing of the ladder sections as well as utilizing energy chain. The energy chain shall be routed through the inside section of the vertical side walls of the aerial ladder device. The cable and/or hose routing shall use one or both bottom cord rectangular tube(s) on the base section of the ladder and the bottom cord rectangular shall utilize the energy chain in order to route all electrical cables and hose lines.
Rollers, which are located in the lower portion of the ladder section(s), shall be applications. Spacer pads, made from the same material as the rollers, shall be installed designed carrier shield(s).
The electrical cables used to transfer power up to the ladder tip shall be energy chain apparatus.
chain is very well suited to resist the harsh environmental conditions by being able to withstand extreme temperatures and is also UV resistant.
WEAR PADS/BEARING SURFACES
shall be used between the telescoping sections for maximum weight distribution, strength, and smoothness of operation. This impregnation shall provide a lubricating function.
Stainless steel adjustment screws shall be provided on the wear pads to permit proper side tension. Plates shall be installed on the sides of the slide pads where adjustment screws come into contact with them. No exceptions shall be allowed to this requirement to prohibit the adjustment screws from embedding themselves into the pads, which may cause the pad to crack and fail.
To prevent additional maintenance and pressure points from the limited surface area, roller systems in place of wear pads will not be considered acceptable.
ROTATION BEARING
A 44-inch diameter external tooth, swing circle bearing shall be used for the rotation system. The bearing shall provide 360-degree continuous rotation. The bearing shall be accommodate a particular bearing.
The bearing shall be bolted to the turntable and to the base support structure with SAE grade 8 bolts. Welding on the bearing in any manner shall not be acceptable.
9.a
Packet Pg. 399 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The turntable base and the torque box bearing plate surfaces that contact the bearing shall be machined to prevent loading the bearing when the attaching bolts are brought to full torque. Machining of the surfaces shall be done after all welding to assure no further distortion of the material.
thereby causing a concentration of forces at the shims.
BOLT TORQUING FROM TOP SIDE
All rotation bearing bolts shall be torqued from the top side of the turntable without the bolt or nut being held under the turntable by a person. Units requiring removal of equipment to access the torque bolts shall be considered unacceptable.
This design shall prevent the bolt from "spinning" while torque is being applied to the fastener. Application of Loctite or a similar compound alone, without any other means provided to hold the fastener shall not be acceptable. Additionally, this design feature shall not incorporate drilling, bending, welding on, or in any way modifying the structural fastener, nut, or washers.
ROTATION GEAR REDUCTION BOX
A hydraulically driven planetary gearbox with a drive speed reducer shall be used to rotation gear reduction box shall be installed on the top side of the turntable so that it is easily accessible, yet it shall be installed so that it does not provide an obstruction or front of the turntable, under the aerial ladder base section. Under no circumstance shall the gear box present any interference with the aerial device, even at low elevations.
Due to the additional maintenance required to keep two (2) rotation motors functioning properly without binding, units requiring more than one (1) rotation motor are not considered acceptable.
A spring applied, hydraulically released disc type swing brake shall be furnished to provide positive braking of the turntable assembly.
Provisions shall be made for manual operation of the rotation system should complete loss of hydraulic power occur. These provisions shall include a manual rotation drive tool supplied with the apparatus.
The hydraulic system shall be equipped with pressure relief valves, which shall limit the rotational torque to a nondestructive power. All moving parts of the rotation gear reduction box shall be enclosed or under the turntable decking eliminating safety hazards.
ROTATION INTERLOCK SYSTEM
The aerial device shall be equipped with a rotation interlock system to prevent the ladder provide for the full tip load rating.
The system shall monitor the stabilizers for extension. When a stabilizer is not
9.a
Packet Pg. 400 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) the aerial from being rotated more than 12 degrees past the front or rear center line into the short-jacked side of the apparatus.
A slowdown feature shall be built into the rotation interlock system. When the aerial is operating in a short-jacked mode, the rotational speed shall be automatically reduced, by approximately 50%, when the aerial is rotated to within approximately 10 degrees of the front or rear center line of the apparatus. The rotational speed shall remain reduced throughout an arc of approximately 20-degrees over the front or rear of the apparatus, regardless of the direction of the rotation movement.
The rotation function shall automatically stop when the aerial approaches the front or rear corner area of the short-jacked side of the apparatus.
The rotation interlock system shall allow for normal operation on the side of the An override system, activated by pull knobs within the main turntable control pedestal, shall be provided that allows the operator to rotate the aerial into the non-recommended (short-jacked) side of the apparatus, should the situation absolutely demand it.
To ensure the maximum amount of safety, units allowing aerial rotation to the short-jacked side of the apparatus or systems which only include a visual and audio warning without automatically stopping rotation shall not be acceptable.
AERIAL STOW OPERATION INTERLOCK SYSTEM
A safety feature shall be included in the aerial operational system that limits the possibility of damage to the apparatus when stowing the aerial.
When a rear mounted aerial is positioned over the cab area of the apparatus, the interlock system shall not allow the downward movement of the aerial below a preset angle of elevation, unless the aerial is rotated into the bed-zone envelope. The bed-zone shall be approximately 2 degrees of rotation to the left and right side of the center of the aerial bed support. Once this bed-zone envelope is attained, downward movement of the aerial shall be allowed for proper positioning into the bed support.
An indicator light shall be located at the turntable control station to inform the aerial operator when the bed-zone envelope is attained.
COLLISION PROTECTION INTERLOCK
The apparatus shall be equipped with a cab collision protection interlock. This interlock shall be enabled while rotating the aerial device at elevations as low as, or lower than the cab of the apparatus.
Should the operator accidentally rotate the aerial device toward the cab at an elevation low enough to cause a collision with the cab, the interlock shall automatically stop rotation of the aerial at a point that is within a few degrees of the cab.
A manual override shall be provided to override the interlock system.
APPARATUS BODY DAMAGE CONTROL INTERLOCK SYSTEM
9.a
Packet Pg. 401 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) A safety feature shall be included in the aerial operational system that minimizes the possibility of damage to the apparatus body at all angles for all standard (non-override) operational modes.
The system shall automatically stop the downward movement of the aerial at a preset angle of elevation unless the aerial has been rotated at least 80-degrees, left or right, from the center of the ladder support. Once this rotation point is reached, full range downward movement (to -8 degrees) shall be allowed.
The aerial manufacturer shall determine and set the angle of elevation where downward aerial movement is stopped. The highest point of an apparatus, in relation to the distance from the turntable, shall be used to determine the pre-set elevation angle stopping point.
The system shall also minimize the possibility of accidental damage to the apparatus body from aerial rotation whenever the aerial elevation is below the preset elevation angle stopping point.
Rotational speed shall be reduced by approximately 50% when the aerial is rotated within a minimum of 10 degrees of a body avoidance stopping point. Aerial rotation shall automatically stop before the aerial contacts the body of the apparatus. aerial is raised above the preset downward movement stopping point.
The body damage interlock system shall not eliminate the possibility of damage to components such as telescopic lights that are in a raised position.
A manual override shall be provided that will override the interlock system.
POWER TAKE-OFF
transmission and actuated by an electric shift, located inside the cab. The PTO, which drives the hydraulic pump, shall meet all the requirements for the aerial unit operations. "THRU-DRIVE" HYDRAULIC PUMP
The hydraulic system shall be supplied by a pressure compensated, load sensing, ladder functions to operate simultaneously, without noticeable loss of speed. The pump shall supply oil only when the ladder is in motion, thereby preventing overheating of the hydraulic oil.
The pump shall be a "thru-drive" design. This design shall be provided for applications that require a power source for additional hydraulically operated accessories or tools.
An interlock shall be provided that allows operation of the aerial device PTO shift only after the chassis spring brake has been applied and the chassis transmission has either been placed in the neutral position or the drive position if the driveline has been disengaged from the rear axle.
9.a
Packet Pg. 402 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
HYDRAULIC SYSTEM
The tubing and hoses used in the hydraulic system shall have a high-pressure rating, with the tubing having a minimum burst pressure of 9,600 to 17,400 PSI and the hoses being a minimum of 8,000 to 13,000.
The hydraulic oil tank shall have an approximate capacity of 50 gallons. A dipstick shall positive protection from contaminates. A magnetic drain plug shall be provided in a low on the hydraulic oil tank. The hydraulic oil tank shall be furnished with two pick-up tubes, one tube for normal operation and the other for emergency operation. The emergency pick-up tube shall extend further down into the oil tank to provide for reserve oil in case a hydraulic line is broken.
The hydraulic system shall be protected from possible hydraulic pump malfunctions by a relief valve, which shall route the excess oil into the oil tank when the pressure in the hydraulic system exceeds 3,500 PSI. The hydraulic control valves shall also be protected by being plumbed to a pressure relief valve to protect them from high pressure.
The hydraulic system shall be designed in such a way that all non-sealing moving components whose failure could result in motion of the aerial device shall have a minimum bursting strength of four times the maximum operating pressure to which the component is subjected. The hydraulic system shall have adequate cooling for continuous operation of not less than 2-1/2 hours.
HYDRAULIC PRESSURE GAUGE
A 2-1/2" Innovative Controls 5,000 PSI, pressure gauge model IC-3010339-21933E-OTP, shall be located at the ground level control station to monitor the hydraulic system system is energized. The liquid shall not be vulnerable to freezing in subzero temperatures.
3 MICRON HIGH-PRESSURE FILTER
hydraulic pump.
The stabilizer hydraulic and diverter valves will be located behind the turntable access steps and will be accessible though a panel.
Shop Note: ***Subject to Engineering Approval***
RESERVOIR ISOLATION KIT
Two (2) 1/4 turn ball valves shall be installed on the hydraulic reservoir to isolate it from elements during routine maintenance.
9.a
Packet Pg. 403 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
EMERGENCY PUMP
The apparatus shall be equipped with one (1) emergency hydraulic pump electrically driven from the chassis battery system. The emergency pump shall be capable of providing adequate ladder functions to stow the aerial and stabilizers in the case of main hydraulic pump failure.
Two (2) control switches for this emergency pump shall be provided. One switch shall be installed at the turntable control console and the stabilizer control station. The switches shall be labeled EPU.
The switch at the stabilizer control station shall be a lighted momentary switch. The switch at the turntable control pedestal shall be a lighted switch on the switch pad.
HYDRAULIC SWIVEL
The aerial ladder shall be equipped with a swivel at the turntable. The swivel shall connect the hydraulic lines from the hydraulic pump and reservoir to the aerial control bank at the turntable, above the point of rotation.
The swivel shall connect all the electrical circuits through the rotation point. A minimum of thirty-two (32) collector rings shall be provided. All collector rings shall be enclosed and protected with desiccant plugs to protect against condensation and corrosion. Due to the possibility of paint contamination and dirt attraction, units requiring oil or silicone to protect the collector rings shall not be acceptable.
The swivel shall allow for 360 degrees of continuous rotation of the aerial device with no loss of speed or capacity in functions.
ANGLE INDICATOR
The indicator shall give accurate elevation in degrees from -20 to +80 degrees in relation to level. The liquid shall be of proper viscosity and composition to remain in liquid form even when exposed to below zero temperatures. Reading of the indicator shall be accomplished by observing the position of a suspended ball in relation to the degrees of elevation as marked on the indicator housing. The indicator shall be backlit for visibility in low light conditions.
EXTENSION INDICATORS
Numerals shall be applied to the inside of the handrail of the base section opposite the turntable control console. The numerals shall be at appropriate intervals indicating total marks at the appropriate extension distance. The extension indicator color shall provide a high contrast with the color of the ladder section to which it is applied. This shall make the length of aerial extension easily readable by the operator by merely glancing at the indicators. Numerals indicating the length of extension shall be placed adjacent to indicating bands.
MANUAL ROTATION DRIVE TOOL
As required by NFPA, current edition, one (1) manual rotation drive tool shall be provided
9.a
Packet Pg. 404 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) as a means to rotate the turntable in the unlikely event of power loss. This drive tool shall be provided as standard equipment.
TORQUE BOX
A "torsion box" subframe shall be installed on the chassis frame rails, integral with the stabilizers. The torque box shall be constructed of steel plate. The steel plates shall have a minimum yield strength of 36,000 psi and ultimate tensile strength of 58,000 - 80,000 psi. The torque box subframe assembly shall be capable of withstanding all torsional and horizontal loads when the apparatus is supported by the stabilizers. The torque box shall be bolted in place to the chassis frame rails.
The torque box shall have a section modulus of 516.9 cubic inch and a resistance to bending moment of 18,611,273 inch pounds.
The aerial torque box shall be painted with High Solids polyurethane paint. The color shall be black.
To prevent unnecessary stress on the chassis, apparatus that use the chassis frame in place of a true torque box shall not be acceptable.
The torque Box will be adequately lit for night time operations.
FRONT AND REAR STABILIZERS
Two (2) sets of stabilizers shall be installed for stability. Both sets shall be an extending at a 16' spread, measured from the outermost edge of the stabilizers on each side of the apparatus. For additional stability, the stabilizers on each side of the apparatus shall have the capability of extending one (1) extra foot to a maximum spread of 18'. In order to get the true stabilizer spread, apparatus using measurements other than from each outside edge of the stabilizers shall not be considered acceptable.
The front stabilizers shall be located directly behind the chassis cab rear wall for part of the torque box. A heavy-duty undersling assembly shall attach the front stabilizers to the front portion of the torque box. The overlap of the undersling and the torque box shall be a minimum of 24". The bottom side of the tubes shall contain a truss assembly that shall maximize the torsional strength of the undersling assembly.
The front stabilizers and torque box shall be attached to the truck frame in six (6) separate locations, three (3) on each side of the apparatus. The mounting plates shall be located directly under the front stabilizers, under the front torque box area and at the rear stabilizer area.
The rear stabilizers shall be located directly behind the chassis rear wheels. The stabilizers shall be an integral part of the torque box.
The stabilizers shall be of the double box tube design with jack cylinders that have a 5" internal diameter (bore) and a 2.5" diameter solid cylinder rod. The jack cylinders shall be equipped with integral holding valves, which shall hold the cylinders either in the stowed or the working position, should a charged line be severed at any point within the hydraulic system.
9.a
Packet Pg. 405 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) The steel used to build the stabilizer system shall have a minimum yield strength of 36,000 psi and ultimate tensile strength of 58,000 - 80,000 psi.
Vertical jack cylinder rods shall be fully enclosed by a telescoping inner box to protect the cylinder rods, seal glands and pistons against damage from nicks, abrasion, and chrome damage. All vertical stabilizer cylinders shall be removable from the top of the box tube. The inner double box system shall be further designed to stabilize the column load imparted upon the cylinder rod, thereby also protecting against damage which may occur from lateral loading possibly caused by side slopes, shifting or sliding of the apparatus on icy or unstable surfaces, sudden sinking of one or more jack pads, or on scene collision while the aerial device is deployed. Vertical stabilizers that require cylinders to be removed from the bottom, or have the vertical stabilizer cylinders exposed, shall not be acceptable.
The stabilizers shall be connected to the hazard light circuit to warn the driver if they are not stowed when the parking brake is released.
Each extending style stabilizer shall have a painted stabilizer cover. The paint will match the color of the body unless noted in the shop order. The cover shall be adjustable to The stabilizers shall contain safety lock valves and require no mechanical stabilizer pin locks, pin storage holders, or pin holes machined in the stabilizer extending beams.
STABILIZER STROKE
The stroke of the stabilizers shall be a minimum of 25". The stabilizer pad shall be maintained at a stored height of approximately 12" to 15" (dependent on required ground clearance and angle of departure) resulting in a minimum ground penetration of 10" or greater.
STABILIZER FINISH
The extending front/rear stabilizer beams, inner jack tubes, and stabilizer pads shall be shot blasted to remove any mill scale or contamination. The individual components shall then be hot dip galvanized. The galvanizing process shall require that the entire assembly is completely submerged. Following the galvanizing process, the surface shall be ground smooth to remove dross. This preparation shall provide maximum protection for these critical components. No exceptions shall be allowed to this requirement due to stabilizers exposure to salt spray and road debris.
acrylic primer. The primer color shall be black.
STABILIZER EXTENSION SYSTEM
Extension of the front and rear horizontal beams shall be activated by dual extension cylinders, which shall each have a 2" internal diameter (bore) and a 1.25" diameter cylinder rod. The extension cylinders shall be totally enclosed within the extension beams to prevent damage to the rod and hoses. The extension beams shall be 6.00" x
8.00" x .375" wall steel tubing with a .62" steel plate welded to the top and bottom of each beam.
9.a
Packet Pg. 406 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
WEAR PADS/BEARING SURFACES
shall be used between the stabilizer housing assembly and the extension tube for maximum smoothness of operation.
Two (2) Nylatron wear pads shall be installed in each stabilizer extension system. There shall be one wear pad located on the top back portion of the extension tube assembly that shall glide on the inner wall of the top housing tube wall. There shall be an additional pad located on the inner wall of the bottom housing tube wall that shall separate the bottom side of the extension tube and the bottom wall of the housing tube. The pads shall be installed in such a manner as to reduce friction for ease of operation and to reduce the amount of metal to metal contact.
Each stabilizer down jack housing tube shall contain four wear pads, one (1) on each side of the tubes.
STABILIZER ANGLE LEVEL GAUGES
One (1) manual angle level gauge shall be located on the rear of the apparatus. The gauge shall have a sight bubble that will measure the side-to-side angle of the apparatus in 2 degree increments.
One (1) manual angle level gauge shall be located on the side of the apparatus, near the rear. The gauge shall have a sight bubble that will measure the fore-to-aft angle of the apparatus in 2 degree increments.
ELECTRIC / HYDRAULIC STABILIZER CONTROLS
The stabilizer controls shall be located at the rear of the apparatus. Two (2) stations shall be installed, one (1) on each side at the rear, arranged so that the operator has full visibility of the stabilizer being positioned. All stabilizer control functions shall be of the electric paddle joystick style. The make and model of the joysticks shall be P-Q controls, model M105. The controls shall be designed to allow stabilizers to be operated independently so that the vehicle may be set up in a restricted area or uneven terrain.
An electrically actuated diverter valve shall be provided in conjunction with the stabilizer to the stabilizer circuit or the turntable and ladder circuit.
A stabilizer deployment warning alarm, activated by stabilizer mode, shall be provided at each stabilizer to warn personnel. The warning alarm shall deactivate only when all longer in the stabilizer mode.
The stabilizer controls shall each be accessible through a painted stainless steel door.
GROUND CONTROL STATION
A control station shall be located at the rear of the apparatus in an easily accessible area. The control panel shall be illuminated for nighttime operation. The following items operation and viewing:
9.a
Packet Pg. 407 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Individual stabilizer down indicator lights
Aerial PTO engaged indicator light
High idle switch with indicator light
Emergency hydraulic pump control with indicator light
Stabilizer/Aerial diverter control with indicator light Side to side leveling bubble
A weather proof compartment shall be furnished behind the control panel and shall contain the aerial circuit breakers, interlock components and control circuit distribution terminals. The control station shall be accessible through a painted stainless steel door.
The stabilizer controls and ground control station surfaces shall be fabricated from 3mm thick solid core aluminum composite panel with double-sided painted aluminum outer surfaces bonded to a solid polyethylene core. They shall include an Innovative Controls graphic overlay design and supply a second- surface printed UV and scratch-resistant polycarbonate graphic overlay backed with UL 969-compliant outdoor adhesive.
AUXILIARY STABILIZER PADS
An auxiliary pad for additional load distribution on soft surfaces shall be supplied for each stabilizer. The pads shall be constructed of ultra-high molecular weight composite material that is a minimum of 1" thick with a minimum surface area of 576 square inches.
The auxiliary pads shall be stored in locations that are readily accessible.
STABILIZER COVER WARNING LIGHTS
stabilizer cover panel, for a total of four (4). These lights shall be red in color with a clear lens and activated by the aerial master switch and emergency master switch.
The light bezels shall match the color of the lower zone light bezels.
STABILIZER ARM WARNING LIGHTS
stabilizer beams. Each stabilizer beam shall include two (2) lights, one (1) facing forward and one (1) facing rearward. The lights shall be mounted inboard of vertical jack tubes.
The warning lights shall be activated by the aerial master switch.
STABILIZER WORK LIGHTS
illuminate the surrounding area. The lights shall be located under the stabilizer beams and activated by the aerial master switch.
TURNTABLE
The turntable shall be designed in such a manner as to allow a generous working area, regardless of the position of the aerial, including when positioned at maximum elevation. apparatus body.
The turntable shall be a minimum of 95" side to side and 95" forward to aft.
9.a
Packet Pg. 408 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) It shall be covered with Tread-Grip Safe-Deck pattern decking to allow the walking surface to shed liquids with unparalleled ease and comply with NFPA intent, to provide secure footing for the operator in all weather conditions.
A downward lip shall "skirt" the turntable decking around the entire circumference to provide protection from hazards.
All hoses and electrical lines shall be routed under removable covers in order to prevent a tripping hazard. The covers shall also be designed to prevent damage from occurring to these components. Likewise, the center of the turntable shall have a removable step of the aerial ladder.
To prevent unnecessary added weight to the apparatus, the turntable shall not be built entirely from solid materials.
AERIAL PIVOT PINS
The aerial device pivot pins shall be located on the turntable and shall attach the aerial device base section to the turntable. To maintain a suitable safety factor, the pivot pins In the interest of safety, the pivot pins shall be located as low as possible and shall be at the aerial device base rails. This shall keep the pivot points away from the areas where persons regressing to and from the aerial base section, might place their hand(s).
Aerial pivot pins shall be installed with a means to keep the pins in place. The design
TURNTABLE HANDRAILS
Three (3) handrails shall be of one piece construction and provide large sweep corners at the edge of the turntable. Each shall be 42" high and shall be constructed of knurled stainless steel. The handrails shall be installed around the rear 180 degree perimeter of the turntable for operator and personnel safety. Each individual handrail shall be secured to the turntable by the use of two (2) minimum 5/8" anchor bolts on the underside of the turntable. Additionally, chrome plated stanchions with rubber gaskets shall be provided on the top surface of the turntable where each railing meets the decking surface.
There will be two (2) openings in the handrails for access from the turntable access ladders.
TURNTABLE RESTRAINTS
Two (2) FRC ManSaver Bars, without covers, shall be installed in the spaces between the handrails. They shall be permanently attached at one end.
TURNTABLE WORK LIGHTING
The turntable shall be lighted for night time operation with two (2) 9" LED tube lights, which shall be automatically activated by the aerial master switch (day or night). The work lights shall be positioned so the light is directed toward the decking. The lights shall have cast aluminum housings to keep light from glaring upward into the operator's eyes.
9.a
Packet Pg. 409 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) An additional Truck-Lite LED light shall be recess mounted in the front access door of the control stand.
AERIAL HOUR METER
An hour meter shall be installed at the turntable control station connected to the system engagement control for the aerial. The meter shall register the total hours of aerial use for scheduling periodic maintenance.
Hour meters that are not connected to the aerial system engagement are not considered acceptable in order to capture true aerial operational hours.
TURNTABLE CONTROL CONSOLE
The turntable control console shall be located on the turntable, on the driver's side of the apparatus. The console shall be illuminated by a Spartan LED tube light with mounting cylinder shall assist in closing the cover automatically when it is positioned over the center. The console surface shall be angled toward the operator so controls may be viewed and operated ergonomically. Rubber bumpers shall be provided so that when the control console lid is closed, the lid and the control panel will be protected from each other (no metal to metal contact).
Three (3) handles for the ladder hydraulic functions (elevation, rotation, and extension) shall be installed at the control console. The controls shall be manual for safety and durability reasons - No Exceptions. The function of each control lever shall be cast into the plate under the appropriate lever. The controls shall be capable of being operated independently or simultaneously with a gloved hand. The speed of movement caused by The control console surface shall be fabricated from aluminum and shall include a graphic overlay. The overlay shall be Innovative Controls design and supply a second surface-printed UV and scratch-resistant polycarbonate graphic overlay backed with UL 969-compliant outdoor adhesive.
The control stand box shall have tread plate and the lid shall be painted aluminum. A hinged door shall be provided on the front of the control console with a lift and turn latch.
This door shall allow access to the inner components for inspection purposes. A recessed work light shall be provided in the access door. A hinged access door shall be provided on the outboard side of the control panel. The door shall be provided with a spring loaded, slotted head latch. The opening shall allow access to the electrical components for service purposes
All turntable controls shall override the controls at the tip. ease of operation and viewing:
Elevation, extension and rotation controls
Lighted push/pull button to deactivate hydraulic and electrical system Fast idle button
Panel light mounted in cover
9.a
Packet Pg. 410 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Rung alignment light
Ladder light switches
Ladder overload warning horn
System pressure gauge
Loadminder
Emergency pump unit switch and light
Monitor function controls
Intercom with controls
Operators load chart
SYSTEM LOCK CONTROL
A push/pull systems engagement control shall be installed at the turntable control console. The control shall energize the hydraulic system for the ladder function and shall be attached to the systems engagement control that advances the engine speed to a preset RPM when the engagement control is in the "RUN" position. In the "LOCK" position, the engine speed shall return to the normal idle RPM and the hydraulic system be de-energized.
RETRACTION OVERRIDE SYSTEM
An integral part of the extension/retraction system shall be a safety system to prevent system shall be designed in such a manner to prevent retraction of the aerial device another section.
When the steps are in an overlap condition, retraction shall only be accomplished by an operator at the primary control station pressing and holding a momentary switch at the turntable control console while the retraction control is operated.
AERIAL LOAD SENSING SYSTEM
A Loadminder shall be installed at the operator's pedestal indicating the load(s) on the aerial device. The display shall be in the form of a LED illuminated bar graph. The instrument shall be readable in day and night conditions. The display shall be a "real time" display, thereby giving immediate readings to the operator. Additionally, a color-coded bar shall be above and below the actual LED bar graph, to surround the actual reading given to the operator; thereby making the display easier and faster to read. The bar graph illuminates, representing a load on the aerial ladder, the operator need only glance at the display to determine the load applied to the aerial device - in relation to 100% rated aerial device capacity.
The readout given by the display shall be continuous relative to the NFPA compliant be limited to) the following items:
9.a
Packet Pg. 411 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Accumulated equipment on any and all ladder sections, or at the tip including manufacturer installed items or customer installed items Accumulated personnel on any and all ladder sections or at the tip Accumulated ice buildup on any and all ladder sections or at the tip The total load suspended from any load lifting / rappelling eye installed by the manufacturer
Any load reaction from dynamic loads placed on or realized by the aerial structure Any water weight or reactionary force realized by the aerial structure Any combination of the above items
The Loadminder shall be connected to a 100 dB. alarm at the operator's control station that shall sound when the ladder load is above the rated capacity. This alarm system shall also be connected to two (2) strobe lights on the end of the base section, one on each side, to provide further notice to the operator of an unsafe condition.
AERIAL LADDER LOAD CHART
A load chart shall be installed at the turntable control console of the aerial ladder. The load chart shall illustrate the full operating range of the ladder, with the waterway dry or
AERIAL COMMUNICATION SYSTEM
A Fire Research Always Clear Talking (ACT) Intercom, model ICA910-112, two-way system shall be provided between the aerial tip and the turntable control console. The intercom kit shall include two control modules, one at the aerial tip that is hands-free and one at the turntable control console that has a push-to-talk button, two speakers, and cables. The interconnection between control modules shall require two wires. The control modules shall have a LED volume display and push-button volume control. The hands-free module shall constantly transmit to the other module unless the push-to-talk button is pressed.
The intercom shall be designed for exterior use. The control module shall be no more than 2 7/8" high by 5 1/8" wide by 1 7/8". The speaker shall be no more than 5 1/8" high by 5 1/8" wide by 1 1/2" deep. The power requirements for each control module with a speaker shall not exceed 1/2 amp at 12 VDC.
TRACKING LIGHTS
Two (2) Whelen MPPB lights shall be installed low ahead of the cradle, on the base aluminum housing, powder coated black.
The LED work lights shall be rated to last 100,000 hours and produce over 3600 lumens pattern. The lights shall be controlled from the operator control station at the base of the ladder.
A bolt-on bracket to support the light shall be included.
The tracking lights shall be controlled by a toggle switch located on the turntable control console.
9.a
Packet Pg. 412 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) EGRESS
A shorter than standard length, removable, bolt on egress shall be installed on the tip of shall allow for easy replacement should the egress become damaged during rescue operations. This shall minimize the risk and cost of downtime, as is common with welded section shall not be acceptable.
When the ladder is at 0 degrees elevation, the rungs on the egress shall be on a plane of -11 degrees. This shall provide a smoother transition onto the ladder from the tip when it is at a high angle elevation.
transition between the two. The egress handrails shall have a radius design at the tip to eliminate corner joints, increase strength, and provide a professional appearance.
AERIAL LADDER CREEPER CONTROLS
shall consist of three (3) spring loaded, triple pole double throw, return to center switches, one for each main ladder function. Each function switch shall be labeled on a black and white label that is located adjacent to the switches. Each switch shall be encircled by a rubber boot to protect the switch box from collecting moisture. The creeper control shall allow the crew member on the tip of the ladder to operate these three functions within the speed limitations as set forth in accordance with NFPA, current edition.
A momentary switch shall be installed at the lower turntable control console to activate the creeper control system. When in the "normal" position, the system shall be de-energized. When the switch is held in the "on" position, power shall be available to the person at the tip and they shall be able to adjust the aerial with the creeper controls.
SECTION FOLDING STEPS
One (1) set of folding steps shall be installed at the tip of the ladder to provide solid footing for personnel while operating the elevated master stream device.
A kick plate shall be provided with each step.
on the apparatus.
FLY SECTION LOAD LIFTING/RAPPELLING EYES
The aerial ladder shall be equipped with two (2) load lifting/rappelling eyes at the tip of tip load of the ladder structure.
9.a
Packet Pg. 413 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
AERIAL WIRING
The DC wiring shall be Thermoplastic Elastomer (TPE) control cables and shall be highly for high tensile strength. The conductors shall be braided in bundles around the high resistant, bio-oil-resistant, PVC-free, halogen-free, and UV-resistant with low-than 5x the outer total diameter of the cable while moving.
This will allow up to 30 amps of 12V lighting on the aerial.
WHELEN PIONEER PLUS TIP LIGHTS
Two (2) Whelen PCH1P1 Pioneer Plus Super-LED light on a pedestal mount shall be installed at the tip of the aerial.
and a locking swivel joint with a 3/4" diameter NPT threaded base to allow the light to be manually tilted up/down and locked in position by the operator. There shall be a removable handle standard on the lighthead. The light shall have the Whelen lifetime warranty.
The light shall be complete with one (1) Whelen pedestal mount.
The lights shall be located at the aerial tip, one (1) on the driver's side and one (1) on the The tip light(s) shall be controlled by a toggle switch located on the turntable control console.
LOCATOR LIGHT
One (1) Tomar self-controlled amber strobe locator light shall be provided. The light shall be activated by the aerial master switch.
The locator light shall be located on the driver's side of the aerial tip.
WATERWAY SYSTEM
A waterway system shall be provided consisting of the following components and features:
A 4-1/2" outside diameter pipe shall be connected to the water supply on one end and to a water swivel at the rotation point of the turntable. The swivel shall allow the ladder to A 4" inside diameter pipe waterway shall be routed through the rotation point swivel up to
9.a
Packet Pg. 414 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) while elevating the aerial ladder from -8 degrees below to +72 degrees above horizontal.
The heel pivot pin shall not be integral with the waterway swivel at any point. The design of the waterway shall allow complete servicing of the waterway swivel without disturbing the heel pivot pin.
WATERWAY PIPE DIAMETERS
The integral telescopic waterway system shall consist of a 5" outside diameter steel pipe in the base section, a 4-1/2" diameter pipe on the second section, a 4" outside diameter CP-84 CHROME PLATED WATERWAY
The CP-84 telescopic waterway shall be composed of high quality 84K PSI steel. The pipes shall be professionally prepared to accept a highly durable, hot dipped galvanizing coating. Preparation shall include de-greasing as needed, followed by shot blasting to remove any contaminates or scale.
Following preparation, each water pipe shall be hot-dipped galvanized. The pipes shall be completely submerged in the galvanizing bath to ensure 100% coverage and intimate bonding of the galvanic coating to the steel. Following the dipping process, all dross shall Each pipe shall then be prepared to be heavily chrome plated. Materials (nickel/copper/ chrome) used in the chrome plating process shall be of the highest purity to complete the chrome plating process. The chrome shall be polished to an extremely high luster.
The result of the preceding processes shall provide an aerial waterway that is of unequaled quality and durability. The heavy galvanizing and chrome plating shall ensure that no corrosion occurs on the waterway and that the outer surface remains smooth for long seal life. Additionally, the chrome plating shall aid in preventing nicks, scratches, and abrasions from occurring where they would otherwise easily occur with softer and more malleable aluminum tubes.
The waterway on the base section of the aerial device shall be galvanized with the process described above, followed by complete coverage utilizing paint of job color.
POSITIONAL WATERWAY
section to be clear of obstructions when using the aerial device for rescue purposes. It shall be designed in such a manner as to allow the master stream device to be secured designed in such a manner that when it is in the forward position the monitor master stream device shall be connected to the tip of the ladder and when it is toward the back, the device travels with the next lower ladder section. The connection for remote nozzle controls and electricity to the unit shall be permanent and not incorporate any spring loaded cable reels or electrical contact pads that can foul or become damaged allowing the monitor to become inoperable. In addition, the system shall require no external power supply such as a battery to operate the monitor.
A switch shall be located at the turntable control console for the positional waterway. The
9.a
Packet Pg. 415 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) switch shall activate an electric actuator mechanism that will lock the monitor in the desired position. Two (2) separate indicator lights shall be located near the positioning switch to inform the aerial operator of the current position of the monitor. The individual lights shall be labeled "Rescue" and "Water Tower".
end of the ladder and manually change the position of the waterway will not be considered acceptable.
WATERWAY RELIEF VALVE
A 3/4" safety relief valve shall be installed in the base section waterway. The relief valve shall be preset at 240 psi. The valve shall protect the waterway from overpressure, which is normally caused by the capping of the monitor outlet. This valve in no way is to
WATERWAY DRAIN VALVE
A 1-1/2" drain valve shall be installed in the lower section of the aerial plumbing under the apparatus. The valve, when opened, shall drain the aerial waterway and lower plumbing.
AERIAL WATERWAY INLET
apparatus to be used for supplying the aerial waterway.
A 4” NST waterway weld bushing shall be provided.
One (1) 4" NH thread rocker lug chrome plated vented cap, complete with cable or chain, shall be provided.
TASK FORCE TIPS FLEX ELECTRIC MONITOR
There shall be one (1) Task Force Tips Flex, model YN-EP1A-L, electrically controlled monitor installed at the end of the aerial waterway. The monitor shall operate with 12-volt direct current.
The electrical components for the monitor shall be waterproof and utilize current limiting and absolute position feedback to protect the drive train at the ends of travel. A six-pin electrical connection for a TFT remote control nozzle shall be provided. Electrical enclosure systems shall have a rating of IP66/IP67 per IEC 65029. The monitor shall allow direct connection to J1939 CANbus systems. The monitor shall be compatible with optional wired and wireless control stations. Monitor shall allow programming, operation, and service procedures through a mobile app. The monitor shall be equipped with manual override knobs for use in the event of power failure. The motors and knobs control stainless steel worm gears for rotation and elevation adjustment.
The monitor shall have the following capabilities:
9.a
Packet Pg. 416 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Full horizontal rotation with travel stops at 90° left and right of center Vertical travel of 135° with stops at 90° above horizontal and 45° below horizontal Field changeable rotation stops, and elevation stops at 45° and 60° above and/or 15° below horizontal. Soft stops can be programmed in any position Flow capability of 2000 GPM (7600 l/min) with friction loss of no more than 5 PSI (0.3 bar)
Maximum operating pressure of 200 PSI
For resistance to corrosion the monitor shall be constructed from hard coat anodized optional pressure gauge shall be provided. The unit shall have a unique serial number The monitor shall be designed with a unique waterway that minimizes the path of travel, reduces friction loss and turbulence, and produces a far-reaching water stream. The
PRIMARY REMOTE MONITOR CONTROL STATION (TURNTABLE)
Task Force Tips model # YC-RP panel mount operator station for Flex series remote control monitors shall be installed. The operator station shall be designed for surface panel mounting from front of panel using 4 fasteners. The unit shall have a mini four direction toggle for horizontal rotation, and vertical elevation. A paddle toggle shall control nozzle stream pattern adjustment. Five programmable buttons can be used to control oscillate, park, water valve, and other accessories. The button labels can be changed to match the functions. Controls can be operated with a gloved hand. The unit shall be programmable from a mobile app. Communications shall conform to J1939 standards.
The unit shall be weatherproof and utilize weatherproof components such as liquid tight electrical connections. A Deutsch connector shall be provided for ease of service and installation. The unit shall have a unique serial number and shall be covered by a two-year warranty.
REMOTE MONITOR TOGGLE SWITCH CONTROL STATION
Task Force Tips model # YC-TS toggle switch operator station for Flex series remote control monitors shall be installed. The operator station shall be designed for surface mounting using 4 fasteners. The unit shall have a mini four direction toggle for horizontal rotation, and vertical elevation. A paddle toggle shall control nozzle stream pattern adjustment. Controls can be operated with a gloved hand. Unit shall be programmable from a mobile app. Communications shall conform to J1939 standards.
The module shall be weatherproof and utilize weatherproof components such as liquid tight electrical connections. A Deutsch connector shall be provided for ease of service and installation. The unit shall have a unique serial number and shall be covered by a two-year warranty.
MONITOR COLOR
The monitor shall be powder-coated silver by the monitor manufacturer and shall not be repainted by the OEM.
9.a
Packet Pg. 417 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) NOZZLE
A Task Force Tips, model M-ERP1500-NN, Master Stream automatic electric nozzle with 3-1/2" NH thread swivel base shall be provided. The nozzle shall be capable of producing a stream at any volume from 300 to 1500 GPM. The nozzle shall feature an electric pressure adjustment knob, which allows the operating pressure to be adjusted to tactile detent settings between 70 and 120 PSI. The nozzle shall include rubber bumper lightweight hard coat anodized aluminum for maximum resistance to corrosion and wear.
MONITOR SWEEP
The outlet vertical rotation shall be from -45 degrees to 120 degrees above horizontal with adjustable stops. When the monitor is operated above the plane of the aerial, the tip load shall be reduced by 250 lbs. The adjustable horizontal rotation shall have preset stops at 90 degrees left of center and 90 degrees right of center.
MONITOR SAFETY INTERLOCK
The monitor shall be equipped with a monitor safety interlock (MSI) that shall prevent the monitor or nozzle from coming into contact with the cab windshield and/or roof. The MSI shall automatically stop the operator from lowering the aerial into the cradle until the monitor has been fully raised to prevent damage. In addition, the blue bed zone indicator shall not illuminate until the ladder is aligned with the cradle and the monitor is in the fully raised position.
STOW FEATURE
The monitor shall be equipped with a stow feature. When activated, the stow feature shall return the monitor to a pre-programmed or nested position. The stow feature shall be activated by a covered momentary switch on the turntable control console. A light shall be provided on the control console to advise when the monitor is in the nested position.
MONITOR CONTROLS
The aerial master stream device shall have two (2) separate control stations. One station shall be at the main aerial turntable control console. The other station shall be located at the tip of the aerial ladder. Each station shall have the capability of controlling the nozzle pattern as well as the horizontal and vertical position of the device. 2-1/2" AERIAL TIP DISCHARGE
A 2-1/2” discharge shall be located at the tip of the aerial ladder. The discharge shall have a Task Force Tips VUM manually controlled monitor valve provided under the monitor. The valve shall be controlled with an NFPA compliant slow-close crank handle gear operator. A position indicator shall be provided to allow for quick visualization of the capability of up to 2000 GPM with friction loss no more than 6 psi. For maximum corrosion protection, the aluminum casting shall be hard coat anodized, with a silver an automatic drain for draining waterway when the valve is closed and unpressurized.
9.a
Packet Pg. 418 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) male outlet. Port C1 shall be located on the left side of the valve and have a left-hand elbow quarter turn ball valve with 2-1/2" NH male outlet installed, extended 4-3/4" from the main valve. C2 and C4 shall have blind plugs installed. C3 shall be located on the right side of the valve and have an External Automatic Drain Valve. All 2-1/2" NH male discharges shall have a 2-1/2" NH female by 1-1/2" NH male thread reducer and a 1-1/2" NH female cap with lanyard.
RUNG ILLUMINATION LIGHTING
The aerial ladder sections shall be equipped with permanently installed blue LED rung illumination lights. The lights shall be mounted on the inside of the ladder sections, lens shall serve to illuminate ladder rungs without inducing any glare, which would hinder safety. Each light shall be equipped with an integral guard to protect it from damage. The lights shall be positioned such that all light be directed inward toward the rungs of the aerial sections, maximizing safety for all personnel during night operations. The lights shall also aid the operator in locating aerial ladder section in conditions of reduced visibility.
Designs that use luminescent tape on the rungs shall not be permitted as they require The rung lighting shall be controlled by a toggle switch located on the turntable control console.
AERIAL LADDER SIGNS
Two (2) sign panels measuring 16" tall x 133" long shall be installed on the base section of the aerial ladder, one on each side. The sign panels shall be fabricated of 1/8" aluminum plate. The signs shall be large enough to accept a maximum lettering size of 12" high.
BASE SECTION MOUNTED STOKES BASKET STORAGE
A storage box shall be provided on the base section for a Stokes basket. The box shall aerial tip from the turntable control console. The box shall be fabricated from smooth aluminum and be painted to match the ladder. The box shall be attached to the aerial section using stainless steel fasteners. A painted aluminum lid shall be provided on the box to secure Stokes basket.
The stokes basket box will have a prox switch wired into the door-ajar warning light circuit to notify when the lid is open.
STRETCHER
The stretcher shall be dealer/customer supplied.
BASE SECTION MOUNTED ROOF LADDER
One (1) roof ladder mounting bracket set shall be provided on the outside of the base section, on the driver's side, for a solid beam roof ladder. The brackets shall be formed using break and bend techniques for added strength and an outstanding appearance. To
9.a
Packet Pg. 419 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) enhance durability, the brackets shall be coated with Bedliner Coating. Stainless steel fasteners shall be employed where the ladder bracket is bolted to the aerial section or ladder sign panel.
The roof ladder shall be secured using a spring-loaded handle, which is easily lifted away from the roof ladder with a gloved hand for safe access.
One (1) Duo-Safety, model 775-DR, 14' aluminum roof ladder with roof hooks on each end shall be provided.
FLY SECTION MOUNTED PIKE POLE
section. A strap shall be provided to hold the pike pole in the bracket.
All aluminum sections of the body shall undergo a thorough cleaning process, starting with a phosphoric acid solution to begin the etching process, followed by a complete rinse. The next step shall consist of a chemical conversion coating applied to seal the After the cleaning process, the body and its components shall be primed with a high solids primer and the seams shall be caulked.
BODY PAINT PREPARATION
superior substrate for painting:
PAINT PROCESS
The paint process shall follow the strict standards as set forth by Guidelines.
The body shall go through a three-stage paint process: primer coat, base coat (color), primer to achieve a total thickness of 2-4 mills. In the second stage of the paint process, the body shall be painted with BTLV650 High Solids Polyurethane Base Coat. A stage of the paint process, the body shall be painted with a Clear Top Coat. A minimum As part of the curing process, the painted body shall go through a Force Dry / Bake Cycle process. The painted components shall be baked at 185 degrees for 3 hours to
HAND POLISHED
After the Force Dry / Bake Cycle and ample cooldown time, the coated surface shall be sanded using 3M 1000, 1200, and/or 1500 grit sandpaper to remove surface defects. In shine to coated surface. No more than .5 mil of clear shall be removed in this process.
The paint shall be a standard non-metallic - color.
9.a
Packet Pg. 420 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
BODY PAINT COLOR
The body shall be painted with High Solids Polyurethane Base Coat.
The single tone body shall be painted red.
PUMP MODULE STRUCTURE OVERLAYS
The side mount structure overlays shall be the same material as the pump panels on each side of the pump compartment. The tubular structure will remain unpainted aluminum.
AERIAL COMPONENT PROTECTION / PAINT
All aerial device components above the rotation point that are not chrome plate, bright aluminum tread plate, or stainless steel shall be painted. All areas to be painted shall be painted shall be phosphatized to remove metal impurities, aid paint adhesion and inhibit paint. The support structure and components below the rotation point shall be painted black.
The extending stabilizer beams, inner jack cylinder protective tubes, and stabilizer pads shall be hot dip galvanized. The extending stabilizer beams, inner jack tubes, and stabilizer pads shall be shot blasted to remove any mill scale, or contamination prior to galvanizing.
Following this preparation, the individual components shall be hot dip galvanized. The galvanizing process requires that the entire assembly be completely submerged.
Following the galvanizing process, the surface shall be ground smooth to remove dross.
This preparation shall provide maximum protection for these critical components.
Following surface preparation, components shall be coated with black water-based self-etching coating. No exceptions shall be allowed to this requirement.
The high gloss polyurethane paint, which shall be applied to the aerial ladder sections and other components above the rotation point, shall be cured at an elevated temperature for a period not less than 2 hours to enhance durability and appearance.
The temperature shall not be less than 180 degrees Fahrenheit. Curing of the paint shall promote a chemical reaction within the substrate that shall harden the paint. The curing shall be performed in a clean, sealed, controlled atmosphere. The atmosphere shall comply with all environmental standards and any air entering the chamber shall be
AERIAL DEVICE PAINT COLOR
The aerial device shall be painted with High Solids polyurethane enamel paint. The color shall be black.
The paint shall be a standard non-metallic - color.
9.a
Packet Pg. 421 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
AERIAL CORROSION PROTECTION
Internal structural members of the aerial structure shall be 100% concealed from oxygen or have corrosion protection applied. Totally sealed members are not subject to the possibility of corrosion attacking the metal from the interior.
The structural tubing of the aerial structure that contains drilled holes or is exposed to outside air and elements shall be protected to eliminate the possibility of corrosion occurring on the inside of the tube. No exceptions as this is imperative to the strength and integrity of the aerial structure.
The interior of exposed tubing shall be coated with a compound labeled NWAC 120-4.
The application of the coating shall be applied after the welding process of the aerial structure is complete and shall cover 100% of the interior of the structural tube. NWAC crevice penetrating, spreading and clinging characteristics. The product dries to a nearly to humidity and condensation.
AERIAL LADDER EGRESS PAINT COLOR
The aerial ladder egress shall be painted with High Solids polyurethane enamel paint.
The color shall be red.
AERIAL LADDER SIGN PAINT COLOR
The aerial ladder signs, mounted on the base section, shall be painted the same color as the aerial ladder.
UNDERCOATING
rubberized polyurethane base compound applied after the body has been primed. The materials used incorporate unused paint products to reduce the amount of waste released into the environment. This coat shall be applied to all hidden pockets and surfaces that are not visible after completion.
automotive type undercoating when the apparatus is completed. During this application, special care shall be taken to avoid spraying the product on air lines, cables, or other items that would hinder normal maintenance.
CORROSION PREVENTION
One (1) 3.75 ounce tube of Electrolysis Corrosion Kontrol (ECK) shall be provided to use when additional items are mounted to the apparatus. ECK protects aluminum and stainless steel against electrolytic reaction, isolates dissimilar metals and gives bedding protection for hardware and fasteners. ECK contains an anti-seizing lubricant for threads. ECK is dielectric and perfect for use with electrical connectors.
THERMOPLASTIC COATING
In designated areas, Bedliner Coating XS-350, a two-component spray-in-place
9.a
Packet Pg. 422 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Tensile strength - 3,432 PSI (ASTM D-412)
Elongation - 162% (ASTM D-412)
Tear Strength - 783 PLI (ASTM D-624)
Shore D Hardness - 60 +/-1 (ASTM D-2240)
thermoplastic polyurethane system shall be used for maximum protection of the body and equipment. Bedliner Coating XS-350 is a 100% high-performance aromatic solids pure Polyurea elastomeric membrane. The coating shall be a fast cure, textured surface, multi-purpose material designed for commercial and industrial applications. It shall adhere to the body and serve as a protective, abrasion resistant liner where applied.
The coating shall exhibit the following minimum typical physical properties:
SAMPLE PAINT CARD
One (1) sample paint card shall be provided with the apparatus. The card shall show an printed on the reverse side.
All lettering and graphics will be dealer/customer supplied and installed.
REFLECTIVE STRIPING - STABILIZER BEAMS
horizontally extending stabilizer beams for increased visibility when extended. The striping shall be 4" wide and white in color.
CHEVRON COLOR - RED/BLACK
The chevron striping shall consist of red, 3M part number 4092, and black, 3M part number 680-85.
service. This sheeting is designed to provide higher sign brightness than sheeting’s that use glass bead lenses. It is intended to also provide high sign brightness in the legibility distance where other sheeting’s do not.
An SOE is required on all units sold before January 1, 2024.
CHEVRON STRIPING - REAR BODY
accordance with NFPA, current edition. The striping shall be in a chevron pattern sloping downward and away front the centerline of the apparatus at an angle of 45 degrees.
Each stripe shall be a minimum of 6" in width. The striping shall consist of a solid base The chevron pattern shall include the rear face of the body. The torque box door shall be
9.a
Packet Pg. 423 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) GENERAL TWO (2) YEARS or 36,000 MILES LIMITED WARRANTY
Purchaser shall receive a General Two (2) Years or 36,000 Miles limited warranty in is incorporated by reference into this proposal, and included with this proposal or available upon request.
BODY STRUCTURE (ALUMINUM) TEN (10) YEARS or 100,000 MILES LIMITED
WARRANTY
Purchaser shall receive a Body Structure (Aluminum) Ten (10) Years or 100,000 Miles proposal or available upon request.
AERIAL LADDER STRUCTURE TWENTY (20) YEARS or 100,000 MILES LIMITED
WARRANTY
Purchaser shall receive a Aerial Ladder Structure Twenty (20) Years or 100,000 Miles proposal or available upon request.
AERIAL LEAK-FREE HYDRAULICS THREE (3) YEARS or 48,000 MILES LIMITED
WARRANTY
Purchaser shall receive a Aerial Leak-Free Hydraulics Three (3) Years or 48,000 Miles proposal or available upon request.
AERIAL WATERWAY TEN (10) YEARS or 100,000 MILES LIMITED WARRANTY Purchaser shall receive a Aerial Waterway Ten (10) Years or 100,000 Miles limited or available upon request.
ELECTRICAL TWO (2) YEARS or 36,000 MILES LIMITED WARRANTY Purchaser shall receive a Control-MAXX Electronics Two (2) Years or 36,000 Miles proposal or available upon request.
PLUMBING AND PIPING (STAINLESS STEEL) TEN (10) YEARS or 100,000 YEARS
LIMITED WARRANTY
Purchaser shall receive a Plumbing and Piping (Stainless Steel) Ten (10) Years or
9.a
Packet Pg. 424 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) included with this proposal or available upon request.
WATER TANK WARRANTY
The tank shall be complete with a lifetime warranty. The tank manufacturer shall mark the tank and furnish notice that indicates proof of warranty. Full details shall be provided in the complete warranty document.
PAINT AND FINISH (EXTERIOR CLEAR COATED) TEN (10) YEARS LIMITED
WARRANTY
Purchaser shall receive a Paint and Finish (Exterior Clear coated) Ten (10) Years limited or available upon request.
PUMP WARRANTY
in the complete warranty document.
9.a
Packet Pg. 425 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement)
9.a
Packet Pg. 426 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Aerial Fire Apparatus and Personnel Training
The following options are proposed for consideration to support the aerial fire apparatus financial responsibility.
Option 1 Finance the Apparatus and Use BIG Funding for Training proposal to support personnel training in truck company operations. This approach would spread the apparatus purchase cost over the financing term and direct the proposed BIG contribution toward preparing personnel to operate the apparatus.
Training is estimated to cost $3,000 to $5,000 per person, depending on the truck academy selected. The total training budget would depend on the number of employees attending and the academy costs. The final amount of BIG funding available for training would need to be confirmed.
Option 2 Use Measure Q 102 for Training and Apply BIG Cost Sharing Utilize Measure Q 102 funds for the appropriate personnel training in truck company operations, subject to confirmation that the proposed use is eligible. Apply the cost share proposed by BIG Under this option, the District would identify the training allocation from Measure Q 102 and method would be addressed separately.
Items to Confirm Before Selecting an Option
of Measure Q 102 funds, the number of employees to be trained, and academy pricing. For the financing option, obtain the proposed financing term, interest rate, payment schedule, and total financing cost before determining affordability.
9.a
Packet Pg. 427 Attachment: Fire Smeal S180 107 Aerial Apparatus_Truck Purchase Agreement (6649 : Fire Truck Purchase Agreement) Joint Meeting Council/BFPD
11/3/26 06:00 PM
Engineering
Fidel Martinez
Other
Doc ID: 6639
COUNCIL RESOLUTION
AGENDA MATTER:
AUTHORIZATION FOR REIMBURSEMENT OF OFFSITE PUBLIC IMPROVEMENTS FOR ELIGIBLE PROPERTY OWNERS WITHIN PUBLIC IMPROVEMENT DISTRICT 81-1 EXECUTIVE SUMMARY:
As per Resolution No. 4713-2013 (Attachment A) adopted on July 1, 2013, the West Section 7 Public Improvements Policy (“Policy”) was established to adopt the methodology to which eligible property owners within Public Improvement District (PID 81-1) could be eligible for reimbursements based on the installation of specified offsite public improvements.
As the City nears completion of the FY 25-26 Street Rehabilitation Project, to facilitate this process, City staff reviewed property ownership information from the San Bernardino County Assessor’s Office to verify dates of ownership needed to determine reimbursement eligibility under the policy. Using the criteria established by Resolution 4717-2013, the City has calculated the proportionate reimbursement amounts for qualifying property owners. Staff is requesting City Council’s approval to authorize the distribution of reimbursement payments in accordance with the adopted policy.
DISCUSSION:
Public Improvement District (PID) 81-1 was established on December 7, 1981, to fund the installation of public sewer facilities within West Section 7 (described as bounded to the north by the I-15 Freeway, the south by Rimrock Rd., the east by Wisteria Ave., and the west by Baldwin Rd.). The assessment period continued through 1997, during which participating property owners contributed to the installation of the public infrastructure. Due to funding limitations, the City was unable to complete all anticipated public improvements within West Section 7. As a result, certain property owners were required to install off-site improvements associated with the development of their properties.
On July 1, 2013, City Council adopted Resolution 4717-2013 (Attachment A), which adopted the West Section 7 Public Improvements Policy (“Policy). The Policy established provisions for the installation of public off-site improvements and reimbursements to eligible property owners within PID 81-1 who had previously installed qualifying off-site public improvements (curb, gutter, and full city street segments) at their own expense. As per the Policy, reimbursement amounts are determined using current unit pricing costs established by the City’s “FY 25-26 Street Rehabilitation Project”. Reimbursement is also based upon property ownership during the PID 81-1 assessment period of 1981-1997. The policy, as adopted under Resolution No. 4717-2013 is summarized below:
West Section 7 Public Improvements Policy
▪ Public Improvement District No. 81-1 was formally established on December 7, 1981, and the final payment made by West Section 7 property owners into the assessment district occurred in 1997.
Therefore, any residential landowner who has owned property in West Section 7 as of December 31, 1997 and paid into Public Improvement District No. 81-1 shall have the following regulations apply:
A. If public off-site improvements at the property have not been made, then the following shall be applicable:
1. When the City constructs the West Section 7 Street Improvement Project, the following public off-site infrastructure shall be installed at no expense to the property owner:
10 Packet Pg. 428
Joint Meeting Council/BFPD
11/3/26 06:00 PM
Engineering
Fidel Martinez
Other
Doc ID: 6639
COUNCIL RESOLUTION
i. Curb / gutter
ii. Full City street segment
2. When the City constructs the West Section 7 Street Improvement Project, the City will install sewer lateral connections to all properties that do not currently have laterals installed. Property owners that have sewer laterals installed by the City as part of the West Section 7 Street Improvement Project will be required to enter into a reimbursement agreement with the City as stipulated in Chapter
12.04.021 of the Barstow Municipal Code.
A. If public off-site improvements at the subject property have been installed, the following shall be applicable:
1. The City shall reimburse each eligible property owner their proportionate share of installing the following off-site public improvements:
i. Curb / gutter
ii. Full City street segment
2. The total reimbursement amount for each property will be determined by the City Engineer based off unit costs for the West Section 7 Street Improvement Project.
3. The proportionate reimbursement amount for individual property owners shall be established based on the length of time the property was owned by each owner during the period that funds were paid into Public Improvement District 81-1.
Given that Public Improvement District 81-1 was established in 1981 and remained in effect through 1997, the overall assessment lasted for seventeen (17) years.
Each year of property ownership during that period of time shall entitle the property owner to be reimbursed for 1/17 of the amount outlined in Subsection B.1 above, and as further described by the schedule below:
i. Owner as of 1981: 100%
ii. Owner as of 1982: 94%
iii. Owner as of 1983: 88%
iv. Owner as of 1984: 82%
v. Owner as of 1985: 76%
vi. Owner as of 1986: 71%
vii. Owner as of 1987: 65%
viii. Owner as of 1988: 59%
10 Packet Pg. 429
Joint Meeting Council/BFPD
11/3/26 06:00 PM
Engineering
Fidel Martinez
Other
Doc ID: 6639
COUNCIL RESOLUTION
ix. Owner as of 1989: 53%
x. Owner as of 1990: 47%
xi. Owner as of 1991: 41%
xii. Owner as of 1992: 35%
xiii. Owner as of 1993: 29%
xiv. Owner as of 1994: 24%
xv. Owner as of 1995: 18%
xvi. Owner as of 1996: 12%
xvii. Owner as of 1997: 6%
With the near completion of the West Section 7 public off-site improvements, the City has researched property ownership criteria in regard to those parcels who have installed offsite public improvements within PID 81-1. To facilitate this process, City staff requested and received historical property ownership information from the San Bernardino County Assessor’s Office. The records were utilized to verify applicable ownership dates and reimbursement percentages. The proposed Reimbursement Schedule (Attachment B) has been attached for review and consideration by the City Council.
FISCAL IMPACT:
The total reimbursement to eligible property owners within Public Improvement District 81-1 is $104,225.60 to be appropriated from the City of Barstow's General Fund (Account No.1001208.5782) - Fund Balance
RECOMMENDED ACTION:
Staff recommends that the City Council take the following actions:
1. Approve the Reimbursement Schedule (Attachment B) for eligible property owners as per the West Section 7 Public Improvements Policy that was established under Resolution No. 4717- 2013 on July 1, 2013.
2. Authorize the City Manager, or her designee, to process and distribute reimbursement payments to qualifying owners as per provided reimbursement schedule (Attachment B).
3. Authorize a budget appropriation in the amount of $104,226 to Account No. 1001208.5782 from the City’s General Fund (Fund Balance).
10 Packet Pg. 430
ATTACHMENT A
Resolution 4717-2013
10.a
Packet Pg. 431 Attachment: RESO 4717-2013 (Attachment A) (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 Property Owners) RESOLUTION NO. 4717-2013
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
BARSTOW RELATED TO OFF-SITE PUBLIC IMPROVEMENTS IN
WEST SECTION 7.
WHEREAS, the area known as Section 7 in the City of Barstow can be generally described as the area bounded to the north by the 1-15 Freeway, to the south by Rimrock Road, to the west by Agarita Avenue, and to the east by Monterey Avenue; and
WHEREAS, a special annexation election was held on October 21, 1969 whereby property owners in Section 7 voted in favor of being annexed into the City of Barstow by a 87-70 vote (Exhibit A); and
WHEREAS, Section 7 was annexed into the City without public facilities such as utilities, streets, curbs, and gutters; and
WHEREAS, in an effort to facilitate the future growth of Section 7, the City established capital improvement plans for the installation of public infrastructure in the area (Exhibit B); and WHEREAS, due to funding constraints, Section 7 was divided into two separate areas known as East Section 7 and West Section 7; and
WHEREAS, East Section 7 can be generally described as the area bounded to the north by the 1- 15 Freeway, the south by Rimrock Road; the east by Monterey Avenue, and the west by Barstow Road; and
WHEREAS, West Section 7 can be generally described as the area bounded to the north by the 1-15 Freeway, the south by Rimrock Road; the east by Barstow Road, and the west by Agarita Avenue; and
WHEREAS, given that higher population densities existed in East Section 7, the City began installing public infrastructure in East Section 7 prior to West Section 7; and WHEREAS, East Section 7 voters approved the formation of Public Improvement District No. 77- 1 to pay the costs of installing City sewer facilities (Exhibit C); and WHEREAS, in conjunction with the installation of the City sewer facilities in East Section 7, the City and the Redevelopment Agency paid for the installation of gas lines, paved streets, curbs/ gutters, water lines, and the Armory Flood Control Channel in East Section 7 (Exhibit D); and WHEREAS, after initiating the public infrastructure improvements in East Section 7, the City then focused its attention on West Section 7; and
WHEREAS, in 1980, the City asked voters in West Section 7 to form a public improvement district to pay for the costs of installing City sewer facilities in West Section 7 (Exhibit E): and WHEREAS, the Barstow City Council, while serving in their capacity as the Redevelopment Agency, voted unanimously on October 6, 1980 that West Section 7 would receive improvements similar to those implemented in East Section 7 as soon as funding became available (Exhibit F}; and WHEREAS, voters in West Section 7 ultimately approved the formation of Public Improvement City Council Resolution No. 4 717-2013 1
10.a
Packet Pg. 432 Attachment: RESO 4717-2013 (Attachment A) (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 Property Owners) District No. 81-1 (Exhibit G) to fund the installation of City sewer facilities in West Section 7; and WHEREAS, given financial constraints faced by the City and Redevelopment Agency, implementing full public improvements in West Section 7 similar to those installed in East Section 7 became infeasible; and
WHEREAS, the City began exploring financing options for fully implementing public improvements in West Section 7, which included a detailed discussion on November 3, 1986 to discuss the potential formation of a second assessment district to be named West Side Section 7 Improvement District No. 87-1 (Exhibit H); and
WHEREAS, according to the minutes of the November 3, 1986 meeting as presented in Exhibit H, the City Manager, serving as the Executive Director of the Redevelopment Agency, stated that it was the City's intention to provide a complete project in West Section 7 through whatever means could be found, and that the potential formation of a second public improvement district to pay for the public improvements was only initiated at the request of property owners given that the City faced funding constraints; and
WHEREAS, the City mailed assessment district formation petitions to all property owners in West Section 7 on December 1. 1986 regarding the potential formation of the West Side Section 7 Improvement District No. 87-1 (Exhibit I); and
WHEREAS, based on the responses received from those that were sent West Side Section 7 Improvement District No. 87-1 formation petitions, there was not sufficient support to form the proposed district to assist with funding the West Section 7 public improvements; and WHEREAS, based on the failure of the formation of the West Side Section 7 Improvement District No. 87-1, the City Council, acting in their capacity as the Redevelopment Agency, directed on February 2, 1987 that staff proceed with installing only the center portion of all streets in the West Section 7 area (Exhibit J); and
WHEREAS, on June 31 2013, the City Council directed that staff prepare a resolution for consideration that would address the issues related to public infrastructure installation in West Section 7.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BARSTOW DOES RESOLVE AS FOLLOWS:
SECTION 1. Public Improvement District 81-1 was formally established by the City on December 7, 1981. The final payment made by West Section 7 property owners into Public Improvement District 81-1 occurred in 1997. Therefore, any current residential land owner who has owned property in West Section 7 as of December 31, 1997 and paid into Public Improvement District No. 81-1 shall have the following regulations apply:
A. If public off-site improvements at the subject property have not yet been installed. the following shall be applicable:
City Council Resolution No. 4717-2013
1. When the City constructs the West Section 7 Street
Improvement Project, the following public off-site
infrastructure shall be installed at no expense to the
property owner:
2. i. Curb / gutter
ii. Full City street segment
When the City constructs the West Section 7 Street
2 10.a
Packet Pg. 433 Attachment: RESO 4717-2013 (Attachment A) (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 Property Owners) Improvement Project, the City will install sewer lateral connections to all properties that do not currently have laterals installed. Property owners that have sewer
laterals installed by the City as part of the West Section 7 Street Improvement Project will be required to enter
into a reimbursement agreement with the City as
stipulated in Chapter 12.04.021 of the Barstow Municipal Code.
B. If public off-site improvements at the subject property have been installed, the following shall be applicable:
City Council Resolution No. 4717-2013
1. The City shall reimburse each eligible property owner their proportionate share of installing the following off-site public improvements:
1. Curb/ gutter
ii. Full City street segment
2. The total reimbursement amount for each property will be determined by the City Engineer based off unit costs for the West Section 7 Street Improvement Project.
3. The proportionate reimbursement amount for individual property owners shall be established based on the
length of time the property was owned by each owner
during the period that funds were paid into Public
Improvement District 81-1.
Given that Public Improvement District 81-1 was
established in 1981 and remained in effect through
1997, the overall assessment lasted for seventeen (17)
years.
Each year of property ownership during that period of
time shall entitle the property owner to be reimbursed for 1 /17 of the amount outlined in Section 1, Subsection 8.1 above, and as further described by the schedule below:
i. Owner as of 1981 : 100%
ii. Owner as of 1982: 94%
...
Ill. Owner as of 1983: 88%
iv. Owner as of 1984: 82%
V. Owner as of 1985: 76%
vi. Owner as of 1986: 71%
..
VII. Owner as of 1987: 65%
viii. Owner as of 1988: 59%
ix. Owner as of 1989: 53%
X. Owner as of 1990: 47°/o
xi. Owner as of 1991 : 41%
..
XII. Owner as of 1992: 35%
xiii. Owner as of 1993: 29%
xiv. Owner as of 1994: 24%
xv. Owner as of 1995: 18%
3 10.a
Packet Pg. 434 Attachment: RESO 4717-2013 (Attachment A) (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 Property Owners) xvi.
xvii.
Owner as of 1996:
Owner as of 1997:
PASSED, APPROVED AND ADOPTED, this 1
st day of July, 2013.
ATTEST:
�
City Council Resolution No. 4717-2013
12%
6%
4 10.a
Packet Pg. 435 Attachment: RESO 4717-2013 (Attachment A) (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 Property Owners) I, JoAnne V. Cousino, City Clerk for the City of Barstow, California, do hereby certify that the foregoing Resolution No. 4717-2013 was introduced at a regular meeting of the City Council of the City of Barstow held on the 1
st day of July, 2013, and was adopted at that regular meeting on the 1 st day of July,
2013 by the following vote:
AYES: COUNCIL MEMBERS GRACEY, HARPOLE; MAYOR HACKBARTH-MCINTYRE NOES: NONE
ABSENT: NONE
ABSTAINED: NONE
RECUSED: COUNCIL MEMBER HERNANDEZ; MAYOR PRO TEM SILVA
City Council Resolution No. 4717-2013 5
10.a
Packet Pg. 436 Attachment: RESO 4717-2013 (Attachment A) (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 Property Owners) TH( <ITT OJ
11BAllSTOW
City of Barstow
California
Council Resolution
4717-2013
Approval of West Section 7 Public Improvement Regulations Information
Department: City Manager Department Category: Resolution Attach men ts
Printout
July 1, 2013 - West Section Seven Public Improvements (Attachment A) July 1, 2013 - West Section Seven Public Improvements (Exhibit A) July 1, 2013 - West Section Seven Public Improvements (Exhibit B) July 1, 2013 - West Section Seven Public Improvements (Exhibit C) July 1, 2013 - West Section Seven Public Improvements (Exhibit D) July 1, 2013 - West Section Seven Public Improvements (Exhibit E) July 1, 2013 - West Section Seven Public Improvements (Exhibit F) July 1, 2013 - West Section Seven Public Improvements (Exhibit G) July 1, 2013 - West Section Seven Public Improvements (Exhibit H) July 1, 2013 - West Section Seven Public Improvements (Exhibit I) July 1, 2013 - West Section Seven Public Improvements (Exhibit J) Executive Summary
During the past several months, as staff has worked to develop proposed modifications to the Barstow Municipal Code related to public off-site improvements, one key consideration has involved how the proposed changes would impact West Section 7. At the direction of the Rules and Policy Committee and the City Council, staff has for the past several months been engaged in an in-depth analysis regarding the history and development of West Section
7. This research has resulted in the development of Resolution No. ___ -2013 for City Council consideration.
The proposed measure lists the chronological history of West Section 7, documents historical City Council policy directions related to the installation of public improvements in the area, and offers a proposed solution for resolving the matter.
Discussion
In developing the proposed West Section 7 resolution, staff accessed all of the City archives and reviewed every related file, report, and document that could be found. Based on that research, a chronology of the history of West Section 7 was developed and incorporated into the resolution. An overview of that history includes the following:
• A special annexation election was held on October 21, 1 969. Property owners in the entire Section 7 area (which can be described as bounded to the north by the 1-15 Freeway, to the south by Rimrock Road, to the west by Agarita Avenue, and to the east by Monterey Avenue) voted 87-70 in favor of being annexed into the City.
o See Exhibit A - Ordinance No. 301 approving annexation of Section 7 into City limits
10.a
Packet Pg. 437 Attachment: RESO 4717-2013 (Attachment A) (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 Property Owners) • In an effort to facilitate the future growth of the Section 7 area, the City established capital improvement plans for the installation of public infrastructure in the area. Due to funding constraints, Section 7 was divided into two separate areas that became known as East Section 7 (which can be described as bounded to the north by the 1-15 Freeway, the south by Rimrock Road, the east by Monterey Avenue, and the west by Barstow Road) and West Section 7 (which can be described as bounded to the north by the 1- 15 Freeway, the south by Rimrock Road, the east by Barstow Road, and the west by Agarita Avenue). o See Exhibit B - September 29, 1976 City Council I Redevelopment Agency Minutes discussing Section 7 capital improvement plans
• In recognition that higher population densities existed in East Section 7, the City began public its infrastructure installation in that area. To start the process, the City asked that the property owners pay for the installation of City sewer mains by forming a public improvement district. Ultimately, the voters agreed and Public Improvement District No. 77-1 was formed.
o See Exhibit C-Public Improvement District No. 77-1 Official Statement • In conjunction with the installation of the City sewer mains in East Section 7, the City and Redevelopment Agency then paid for the installation of gas lines, paved streets, curbs / gutters, water lines, and the Armory Flood Control Channel within the limits of East Section 7. o See Exhibit D - Documents highlighting City installed public infrastructure in East Section 7, including:
• Page 11, PID 77-1 Official Statement - Improvement District History • November 7, 1977- Storm Drain Installation ($1,689,700) • August 7, 1978- Gas Line installation ($23,147)
• December 3, 1979 - Water Line Installation ($327,953) • October 6, 1980- Street Installation Notice of Completion ($1,294, 184) • Once the public infrastructure was installed in East Section 7, the City turned its focus to West Section 7.
In 1980, the property owners in West Section 7 were asked to form a public improvement district to pay for the costs of installing City sewer facilities in West Section 7. As part of that request, a letter sent by the City to property owners on September 25, 1980 1 indicated and implied that the City would install off-site improvements in the West Section 7 area (including water line, gas line, curb/gutter, street, and drainage improvements) if the property owners voted in favor of implementing Public Improvement District No. 81-1 for the construction of sewer mains.
o See Exhibit E - September 26, 1980 letter to West Section 7 property owners regarding establishment of Public Improvement District No. 81-1
• Prior to the formation of Public Improvement District No. 81-1, the City Council, while serving in their capacity as the Redevelopment Agency, voted unanimously on October 6, 1980 that West Section 7 wou Id receive improvements similar to those implemented in East Section 7 as soon as funding became available.
o See Exhibit F - October 6, 1980 Redevelopment Agency meeting minutes iJ/ustrating the City's policy that West Section 7 would receive improvements similar to those installed in East Section 7 • Ultimately, the voters of West Section 7 approved the formation of Public Improvement District No. 81-1 to fund the installation of sewer mains within the West Section 7 neighborhood. o See Exhibit G- Public Improvement District No. 81-1 Official Statement
10.a
Packet Pg. 438 Attachment: RESO 4717-2013 (Attachment A) (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 Property Owners) • After approval of Public Improvement District No. 81-1, the City and Redevelopment Agency became confronted with financial constraints that made the immediate installation of full public improvements in West Section 7 financially infeasible. After analyzing a variety of different alternatives, the City Council, while serving in their capacity as the Redevelopment Agency, conducted a meeting on November 3, 1986 to discuss the potential formation of a second assessment district to be named West Side Section 7 Improvement District No. 87-1. According to the official minutes of that meeting, the City Manager stated that it was the City's intention to provide a complete project in West Section 7 through whatever means could be found. and that the potential formation of the second public improvement district to pay for the public improvements was only initiated at the request of property owners given that the City faced funding constraints.
o See Exhibit H - November 3, 1986 Redevelopment Agency meeting minutes • The City sent out assessment formation petitions to property owners in West Section 7 on December 1, 1986 regarding the potential formation of the West Side Section 7 Improvement District No. 87-1.
However, based on the responses received from the petition, there was not sufficient support from the property owners to fund a second assessment district in the West Section 7 neighborhood. o See Exhibit I - City staff report on formation efforts for the West Side Section 7 Improvement District No. 87-1
• Given that the formation of the West Side Section 7 Improvement District No. 87-1 failed, the City Council, acting in their capacity as the Redevelopment Agency, directed on February 2, 1987 that the City proceed with installing only the center portion of all streets in the West Section 7 area. o See Exhibit J - February 2, 1987 Redevelopment Agency meeting minutes Proposed West Section 7 Public Improvements Policy
Based on the history of West Section 7, staff has developed a proposed solution for City Council consideration to resolve the West Section 7 matter. The suggested policy directive is built around the following framework:
• Public Improvement District No. 81-1 was formally established on December 7, 1981, and the final payment made by West Section 7 property owners into the assessment district occurred in 1997. Therefore, any residential land owner who has owned property in West Section 7 as of December 31, 1997 and paid into Public Improvement District No. 81-1 shall have the following regulations apply:
A. If public off-site improvements at the property have not been made, then the following shall be applicable:
1. When the City constructs the West Section 7 Street Improvement Project, the following public off-site infrastructure shall be installed at no expense to the property owner:
i. Curb/ gutter
ii. Full City street segment
2. When the City constructs the West Section 7 Street Improvement Project, the City will install sewer lateral connections to all properties that do not currently have laterals installed. Property owners that have sewer laterals installed by the City as part of the West Section 7 Street Improvement Project will be required to enter into a reimbursement agreement with the City as stipulated in Chapter 12.04.021 of the Barstow Municipal Code.
8. If public off-site improvements at the subject property have been installed, the following shall be applicable:
10.a
Packet Pg. 439 Attachment: RESO 4717-2013 (Attachment A) (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 Property Owners) .. ... ' -- ... - ... ... ...,t' ... _. _ ... -.&. I. ----- ...,,, __ ..... _ ...... ' ... __ ,.. .. _ ....... t' ... '-' I -... L� _ _.,. .. A "-o-.. -· . ...., .... _ -, .. .) ...., .... L.JI'-.... � ...... ,... ,.. -e- . _ _. -
1. The City shall reimburse each eligible property owner their proportionate share of installing the following off-site public improvements:
1. Curb / gutter
11. Full City street segment
2. The total reimbursement amount for each property will be determined by the City Engineer based off unit costs for the West Section 7 Street Improvement Project.
3. The proportionate reimbursement amount for individual property owners shall be established based on the length of time the property was owned by each owner during the period that funds were pa id into Public Improvement District 81-1 .
Given th at Public Improvement District 81-1 was established in 1981 and remained in effect through 1997, the overal I assessment lasted for seventeen ( 17) years.
Each year of property ownership during that period of time shall entitle the property owner to be reimbursed for 1/17 of the amount outlined in Subsection 8.1 above, and as further described by the schedule below:
i. Owner as of 1981: 100%
ii. Owner as of 1982: 94%
iii. Owner as of 1983: 88%
IV. Owner as of 1984: 82%
V. Owner as of 1985: 76%
VI. Owner as of 1986: 71%
vii. Owner as of 1987: 65%
viii. Owner as of 1988: 59%
ix. Owner as of 1989: 53%
X. Owner as of 1990: 47%
XI. Owner as of 1991: 41%
XII. Owner as of 1992: 35%
XIII. Owner as of 1993: 29%
xiv. Owner as of 1994: 24°/o
xv. Owner as of 1995: 18%
XVI. Owner as of 1996: 12%
xvii. Owner as of 1997: 6%
RULES & POLICY COMMITTEE REVIEW:
This item was discussed with the Rules & Policy Committee on January 28, 2013, February 25, 2013, March 25, 2013, April 22, 2013, May 30, 2013, and June 25, 2013. The Committee recommended that the City Council approve Resolution No. ___ -2013 related to West Section 7 public improvements.
Recommended Action
Staff recommends that the City Council take the following actions:
1. Approve Resolution No. ___ -2013 (Attachment A) related to off-site public improvements in West Section 7.
Meeting History
Jul 1, 2013 7:00 PM Video City Council Joint Special CC/Successor/Bf PD Ii Draft
COUNCIL MEMBER HERNANDEZ AND MAYOR PRO TEM SILVA RECUSED THEMSELVES AS THEY OWN PROPERTY IN THE WEST SECTION 7 AREA. AT 8:04 P.M.
10.a
Packet Pg. 440 Attachment: RESO 4717-2013 (Attachment A) (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 Property Owners) CI1Y MANAGER CHARLES C. MITCHELL gave the chronological timeline of events.
SPEAKERS:
ANTONIO PEREZ - BARSTOW, CA
LAURA ZIEMER� BARSTOW, CA
MIKE HERNANDEZ - BARSTOW, CA
ADRIAN RODRIGUEZ - BARSTOW, CA
JAMES MAZE - BARSTOW, CA
COUNCIL MEMBER HERNANDEZ AND MAYOR PRO TEM SILVA RETURNED TO THE DIAZ AT 8:29 P.M.
RESULT:
MOVER:
SECONDER:
AYES:
AWAY:
APPROVED [3 TO 0]
Julie Hackbarth-McIntyre, Mayor
Richard Harpole, Council Member
Julie Hackbarth-McIntyre, Merrill Gracey, Richard Harpole Timothy Silva, Carmen Hernandez
Powered by IQM2
Intelligent Meeting Management Solutions
10.a
Packet Pg. 441 Attachment: RESO 4717-2013 (Attachment A) (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 Property Owners) Attachment B
Reimbursement Schedule
10.b
Packet Pg. 442 Attachment: Reimbursement Schedule (Attachment B)10.22.26 (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 PUBLIC IMPROVEMENT DISTRICT 81-1
Reimbursement Schedule
Attachment B
APN Deed Date
%
Eligibility
Curb & Gutter
(Linear Feet)
Curb & Gutter
Rate/LF
Curb & Gutter
Total
Street
(Sq. Ft.)
Street
Rate/SF
Street
Total
Proposed
Reimbursement
0183-091-43 3/1/1987 65% 120 $63.00 $4,914.00 1920 $3.60 $4,492.80 $9,406.80 0183-121-30 1/31/1995 18% 70 $38.00 $478.80 0 0 $0.00 $478.80 0183-031-17 3/14/1991 41% 90 $60.00 $2,214.00 990 $3.60 $1,461.24 $3,675.24 0183-041-16 11/27/1991 41% 80 $107.00 $3,509.60 480 $3.90 $767.52 $4,277.12 0183-121-25 3/29/1995 18% 70 $38.00 $478.80 420 $2.10 $158.76 $637.56 0183-031-18 9/23/1994 24% 80 $107.00 $2,054.40 480 $3.90 $449.28 $2,503.68 0183-041-08 12/5/1988 59% 260 $60.00 $9,204.00 600 $3.60 $1,274.40 $10,478.40 0183-121-20 12/27/1989 53% 280 $30.00 $4,452.00 0 0 $0.00 $4,452.00 0183-091-12 3/1/1975 100% 220 $60.00 $13,200.00 0 0 $0.00 $13,200.00 0183-101-23 3/1/1975 100% 215 $60.00 $12,900.00 1260 $3.60 $4,536.00 $17,436.00 0183-121-02 2/28/1978 100% 600 $60.00 $36,000.00 0 0 $0.00 $36,000.00 0183-091-28 10/30/1992 35% 80 $60.00 $1,680.00 0 0 $0.00 $1,680.00 GRAND TOTAL: $104,225.60
10.c
Packet Pg. 443 Attachment: Attachment B - Reimbursement Schedule (6639 : Reimbursement of Offsite Public Improvements for Eligible PID 81-1 Property Joint Meeting Council/BFPD
11/3/26 06:00 PM
Building
Christopher Heldreth
Contract
Doc ID: 6625
AGENDA ITEM
AGENDA MATTER:
INTERGOVERNMENTAL SUPPORT AGREEMENT (IGSA) BETWEEN THE CITY OF BARSTOW AND
THE MARINE CORPS LOGISTICS BASE (MCLB), BARSTOW
EXECUTIVE SUMMARY:
The City Council is requested to enter into an Intergovernmental Support Agreement (IGSA) between the City of Barstow (City) and the Marine Corps Logistics Base (MCLB), Barstow, to provide materials and services necessary to support and enhance the services provided by MCLB's Facilities Maintenance Branch. Due to limited personnel and strict procurement requirements, the proposed IGSA would allow the City to assist MCLB with procuring such services and materials to include road maintenance and repair, drinking water and wastewater analysis, Liquefied Petroleum Gas (LPG), uniform rental service, purchase of materials and services for facility repairs and maintenance, as well as completion of various public works projects. The estimated yearly cost of the IGSA is $1,650,000, although actual costs are based upon the actual materials and services provided to the MCLB by the City.
DISCUSSION:
The Intergovernmental Service Agreement (IGSA) law was adopted by Congress in 2013 to allow government agencies near military installations to partner with the federal government to provide materials and/or services that the local government agency purchases or performs for its own needs. The Federal Government may enter into an IGSA with the local government agency if the materials and/or services are performed for the agency’s own use and are awarded on a competitive basis (10 U.S.C. 2679(a). The City currently has similar IGSA/subcontractor agreements with the Army for work being performed at Fort Irwin.
The IGSA that is currently being proposed by the Marine Corps Logistics Base (MCLB), Barstow, include the following materials and services contained within the following table:
Annex Name Annex Description
Annex A Road Maintenance & Repair Road Maintenance and Repair Services (e.g. Pothole Repairs, Crack Sealing Shoulder Maintenance, Traffic
markings and/or Slurry Seal)
Annex B Drinking Water & Wastewater
Analysis
Required Laboratory Sampling of Drinking Water and
Wastewater
Annex C Liquefied Petroleum Gas (LPG) Purchase of Liquefied Petroleum Gas (LPG) Annex D Uniform Rental Service Uniform Rental Services
Annex E Materials & Services Purchase of Materials & Services for Facility Maintenance Repair
11 Packet Pg. 444
Joint Meeting Council/BFPD
11/3/26 06:00 PM
Building
Christopher Heldreth
Contract
Doc ID: 6625
AGENDA ITEM
Annex F General Facility Construction
Services
Public Works Project
The proposed IGSA would allow for administrative charges to be paid to the City of Barstow for the procurement of materials and/or services that are administered by the City. In regard to the Annex A, Road Maintenance and Repair Services, the City’s Public Works Department will provide such services and administrative charges have been incorporated into the hourly rates. Materials will be billed on an at-cost basis plus a 15 percent (15%) administrative charge. Annex E, Material and Service, are billed a 10% administrative fee, and all other annex’s administrative charges are based upon the actual cost of the maintenance and/or service and are based upon actual invoice charges. Administrative charges are billed as follows:
Amount (Rounded Up
Nearest Dollar)
Administrative Fee
$0-$49,999 10%
$50,000-$99,999 9%
$100,000-$249,999 8%
$250,000-$499,999 7%
$500,000-$999,999 6%
$1,000,000-$1,999,999 5%
$2,000,000-$2,999,999 4%
Over $3,000,000 3%
There is no potential for a substantial impact on the environment with this agreement; therefore, the agreement is exempt from review under the California Environmental Quality Act, per CEQA Guidelines, Title 24, CCR, Section 15301.
FISCAL IMPACT:
Revenue generated under the Intergovernmental Support Agreement (IGSA) between the City of Barstow and the Marine Corps Logistics Base (MCLB), Barstow, is dependent on the materials and/or services provided under the IGSA.
RECOMMENDED ACTION:
Staff recommends that the City Council:
11 Packet Pg. 445
Joint Meeting Council/BFPD
11/3/26 06:00 PM
Building
Christopher Heldreth
Contract
Doc ID: 6625
AGENDA ITEM
1. Find that the Intergovernmental Support Agreement (IGSA) is exempt from review under the California Environmental Quality Act, per CEQA Guidelines, Title 24, CCR, Section 15301.
2. Approve the attached Intergovernmental Support Agreement between the Marine Corps Logistics Base (MCLB), Barstow, with a annual review for financial impacts and triennially reviewed in its entirety.
3. Authorize the City Manager to make necessary non-substantive changes and perform all other necessary acts to implement the agreement.
Attachments:
1. IGSA Agreement with Marine Corps Logistics Base (MCLB), Barstow 11 Packet Pg. 446
INTERGOVERNMENTAL SUPPORT AGREEMENT
BETWEEN
MARINE CORPS LOGISTICS BASE (MCLB) BARSTOW
AND
THE CITY OF BARSTOW, CALIFORNIA
FOR MATERIALAND SERVICE FACILITIES MAINTENANCE AND SUSTAINMENT
SUPPORT
This is an Intergovernmental Support Agreement (IGSA) between the Marine Corps Logistics Base (MCLB) Barstow and the City of Barstow. When referred to collectively, MCLB Barstow and the City of Barstow are referred to as the "Parties."
1. BACKGROUND:
MCLB Barstow’s Facilities Maintenance Branch (FMB) has an enduring, long-term requirement to provide the installation with building maintenance and repair sustainment. The FMB is challenged with limited personnel, availability of DoD-mandated vendors, and strict contracting and acquisition methods.
To address these challenges, specific materials, and services (M&S) that would enhance MCLB Barstow FMB productivity and are supportable by the City of Barstow including: uniform services (purchasing and upkeep), purchase of repair parts and hardware, facility repair materials exceeding $10,000 in value and maintenance and repair of roads and other linear structures, such as road striping, pothole repair, and crack filling. Historically, MCLB Barstow has contracted these services using the government credit purchase card (GCPC), but due to GCPC purchase thresholds, they cannot procure materials or services exceeding $10,000. This need has prompted the pursuit of installation support services through the City of Barstow, which has demonstrated similar capabilities in its existing IGSA with the Department of the Army at Fort Irwin, California.
MCLB Barstow has an enduring requirement to sample drinking water and wastewater generated on the installation from various treatment facilities and elsewhere. MCLB Barstow has historically contracted for analysis of these samples in accordance with permits issued by the State of California. The City of Barstow similarly has sampling and analysis requirements for its respective permits issued by the State of California and has existing laboratory capabilities sufficient to provide analytical services to MCLB Barstow. MCLB Barstow wishes to garner installation support services from the City of Barstow to assist with the installation's environmental compliance needs.
MCLB Barstow has a long-term requirement to provide the installation with Liquefied Petroleum Gas (LPG) to heat buildings, operate material handling equipment, and operate generators for wells. MCLB Barstow has historically contracted for LPG, but the General Services Administration determined that commercial and industrial LPG was out of scope for its vendors to provide out of the United States Marine Corps SERV Mart Stores. The City of Barstow similarly has requirements for LPG and has existing capabilities sufficient to provide services to MCLB Barstow. MCLB Barstow wishes to gamer installation support services from the City of Barstow to assist with the installation's LPG needs.
11.a
Packet Pg. 447 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
2. AUTHORITIES: This IGSA is entered into pursuant to Title 10 U.S.C. §2679 (formerly 10 U.S.C. §2336). It is governed by Department of Defense Instruction (DoDI) 4000.19.
3. PURPOSE: IGSA is made by and between the Commanding Officer, MCLB Barstow and the City of Barstow to establish a reimbursable relationship between MCLB Barstow and the City of Barstow. This IGSA will support the purchasing of Materials and Services (M&S) to support MCLB Barstow’s facilities maintenance and construction requirements, drinking water and wastewater analysis services to support MCLB Barstow, uniform services to support MCLB Barstow, road maintenance and repair to support MCLB Barstow, and support for the purchase of Liquefied Petroleum Gas (LPG) to support MCLB Barstow.
4. DEFINITIONS: The term “Order” means a request under the overarching terms of the IGSA for specific Material and Services, Wastewater and drinking water analyses, Liquified petroleum gas, Road maintenance and repair, and General Facility Construction Services.
5. RELATIONSHIP OF THE PARTIES:
Each Party acts in an independent capacity and is not considered the officer, agent, or employee of the other. Costs for personnel and contractors, including pay, benefits, and travel, are the responsibility of each respective Party.
In the exercise of their respective rights and obligations under this IGSA, each Party acts in an independent capacity, and neither is to be considered the officer, agent, or employee of the other.
Each Party is responsible for all costs of its personnel and contractors, including pay and benefits, support, and travel. Neither party shall provide, without the written consent of the other party, any contractor or employee with a release that waives or purports to waive any rights a party may have to seek relief or redress against that contractor or employee.
6. GENERAL PROVISIONS:
6.1. POINTS OF CONTACT (POCs): The following points of contact (POC) will be used by the Parties to communicate in the implementation of this IGSA. Each Party may change its POC upon a reasonable notice to the other Party.
6.1.1. For MCLB Barstow:
6.1.1.1 Support Agreements Manager: 760-577-6168
6.1.1.2 Operations Officer: 760-577-5406
6.1.1.3 Facilities Manager: 760-577-6544
6.1.2. For the City of Barstow:
11.a
Packet Pg. 448 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
6.1.2.1 Primary POC: Andrew Espinoza, Interim General Manager of Environmental Service (EMAIL) 760-255-5157)
6.1.2.2 Alternate POC: Wesley Garrison, Operations and Maintenance Superintendent ([email protected], 760-577-4588)
6.2. CORRESPONDENCE: All correspondence to be sent and notices given pursuant to this IGSA will be addressed, if to the MCLB Barstow, too
6.2.1. for MCLB Barstow:
Commanding Officer
Business Performance Office (B440)
ATTN: Support Agreements Manager
Box 110115
Barstow, CA 92311-5050
6.2.2. For the City of Barstow:
City Manager, Rochelle Clayton
Phone – (760)255-5101
Email – [email protected]
Community Development Director, Chris Heldreth
Phone – (760)255-5169
Email – [email protected]
Public Works Superintendent, Tom Alva
Phone – (760)255-5140
Email – [email protected]
Field Services Supervisor, Jason Miller
Phone – (760)255-5142
Email – [email protected]
City of Barstow
220 E. Mountain View St.
Barstow, CA 92311
7.3. RECORDS:
11.a
Packet Pg. 449 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
7.3.1. The parties shall follow established procedures in accordance with permits for maintaining books, records, documents, or other evidence pertaining to costs and expenses under this IGSA and Orders hereunder for a minimum of three years after the expiration of the IGSA.
To the extent permitted under applicable Federal laws and regulations, the parties shall each allow the other to inspect such books, records, documents, or other evidence.
8. FINANCIAL DETAILS
8.1. As of the effective date of this IGSA, the costs for all efforts to be ordered hereunder are estimated to be a yearly cost of $1,650,000. This amount is an estimate only that is subject to adjustment by the Parties and is not to be construed as the total financial responsibilities of MCLB Barstow, or the limits of MCLB Barstow’s needs in a given year.
8.2. This IGSA does not document the obligation of funds between the Parties. Any obligation of funds in support of this IGSA will be accomplished using City of Barstow invoices, and upon the certification of an amount of funds on a Purchase Request and Commitment (PR&C) document by a proper funds certifying officer appointed by the Marine Corps, the signature of an individual Order by the IGSAAgreement Manager or IGSA Ordering Officer, and acceptance of the Order by the City of Barstow for the scope of services delineated on the individual Order. The obligation of funds by the Parties is subject to the availability of appropriate funds pursuant to the DoD Financial Management Regulation. No provision in this IGSA will be interpreted to require obligation or payment of funds in violation of the Anti-Deficiency Act, Section 1341 of Title 31, United States Code.
8.3. Billing and Payment: The City of Barstow will submit monthly invoices at the approved prices for services accepted and rendered during the preceding month. Upon receipt of an invoice from the City of Barstow, MCLB Barstow will remit payment within thirty (30) days of receipt.
9. EFFECTIVE DATE: This IGSA takes effect beginning on the day after the last party signs.
10. REVIEW OF AGREEMENT: This IGSA will be reviewed annually on or around the anniversary of its effective date for financial impacts and triennially in its entirety.
11. MODIFICATION OF IGSA: The terms and conditions of this IGSA may only be modified by the written agreement of the parties, dually signed by their authorized representatives.
This IGSA will be reviewed annually on or around the anniversary of its effective date for financial impacts; if there are substantial changes in resource requirements, the agreement will be reviewed in its entirety.
11.a
Packet Pg. 450 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
12. TERMINATION: This IGSA may be terminated early by either party with a minimum 30 calendar days written notice. The IGSA automatically terminates after ten years from the effective date of the agreement.
13. DISPUTES
13.1. If the Parties are unable to agree about interpreting or applying a material aspect of either this IGSA or an Order, the parties agree to engage in an effort to reach mutual agreement in the proper interpretation of this IGSA or the Order, including amendment or termination of this IGSA or the Order, as necessary, or by escalating the dispute within their respective organizations.
13.2. As a condition precedent to a party bringing any action for breach of this Agreement, that party must first notify the other party in writing of the nature of the purported breach and seek in good faith to resolve the dispute through negotiation. If the parties cannot resolve the dispute through negotiation, they may agree to a mutually acceptable method of non-binding alternative dispute resolution with a qualified third party acceptable to the parties. Each party shall pay an equal share of any costs for the services provided by such a third party as such costs are incurred.
13.3. Contractor or employee disputes: All claims and disputes by employees of the City of Barstow, shall be resolved in accordance with state law and local governing policies and procedures. All claims and disputes by contractors arising under or relating to contracts awarded by the City of Barstow pursuant to or related to this IGSA and Orders hereunder, shall be resolved in accordance with state law and the terms of the individual contract. All litigation costs, including settlements and judgments, incurred or agreed to in defense of claims and disputes made by contractors and employees of the City of Barstow are the responsibility of the City of Barstow unless otherwise agreed to in writing by the MCLB Barstow Commander.
13.4. In the event of any third-party dispute or litigation relates to or potentially affects the ability to perform under, this IGSA, the Parties agree to promptly notify each other.
The existence of such a dispute or litigation shall not excuse the parties from performance pursuant to this IGSA or the Orders hereunder.
14. LIABILITY: The City of Barstow agrees and shall hold and save the MCLB Barstow free from all damages, claims, suits of whatsoever nature arising from or incidental to this IGSA and Orders hereunder, except for damages due to the fault or negligence of the MCLB Barstow or its employees. Nothing in this Agreement is intended, nor may be construed, to create any rights, confer any benefits, or relieve any liability, of any kind whatsoever in any third person not a party to this IGSA.
15. ENTIRE AGREEMENT: It is expressly understood and agreed that this IGSA embodies the entire agreement between the Parties regarding the IGSA’s subject matter, thereby merging
11.a
Packet Pg. 451 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of and superseding all prior agreements and representations by the Parties with respect to such subject matter.
16. ANNEXES:
(1): Annex A Road Maintenance and Repairs (to rescind and replace former contract) (2): Annex B Lab Services for Water and Wastewater Testing (to rescind and replace former contract)
(3): Annex C Liquefied Petroleum Gas
(4): Annex D Uniform Services (to rescind and replace former contract) (5): Annex E Materials and Service
(6) : Annex F General Facility Construction Services
17. ATTACHMENT:
Attachment (2):
1) Public Works Cost for Right-of-Way Maintenance
2) City of Barstow – Table of Administrative Charges
IN WITNESS WHEREOF, the parties have executed this IGSA as of this day of , in the year .
MCLB BARSTOW CITY OF BARSTOW
BY: BY:
RUSSELL W. SAVATT IV ROCHELLE CLAYTON
COMMANDING OFFICER CITY MANAGER
DATE: DATE:
11.a
Packet Pg. 452 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
ANNEX A FOR ROAD MAINTENANCE AND REPAIR TO INTERGOVENRMENTAL
SUPPORT AGREEMENT (IGSA) BETWEEN MARINE CORPS LOGISTICS BASE (MCLB)
BARSTOW
AND
THE CITY OF BARSTOW, CALIFORNIA
This is an Annex A to the Intergovernmental Support Agreement (IGSA) between the Marine Corps Logistics Base (MCLB) Barstow and the City of Barstow. This Annex A is made by and between the Commanding Officer, MCLB Barstow and the City of Barstow to establish a reimbursable relationship for road maintenance and repair services including pothole repairs, crack sealing, shoulder maintenance, traffic markings, and/or slurry seal applications to support MCLB Barstow. Total repair and upkeep are not to exceed $500,000 per year.
1.1. MCLB Barstow will:
1.1.1. Pay the City of Barstow within 30 days of receiving approved invoices for accepted services.
1.2. The City of Barstow will:
1.2.1. Execute agreed-upon work as outlined in the scope of work.
1.2.4. Supply all labor, equipment, transportation, supplies, and materials necessary to perform road maintenance services.
1.3. Both Parties will:
1.3.1. Cooperate to ensure mutual goals are met and issues are promptly resolved.
1.3.2. Notify the other party of any concerns and communicate transparently to address issues.
1.3.3. Resolve disputes amicably before initiating termination procedures.
1.3.4. Protect personal information and maintain confidentiality when requested, in compliance with applicable laws.
1.3.5. Respond to public requests for IGSA-related information under the Freedom of Information Act (FOIA).
11.a
Packet Pg. 453 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
ANNEX B FOR LAB SERVICES TO INTERGOVENRMENTAL SUPPORT AGREEMENT (IGSA) BETWEEN MARINE CORPS LOGISTICS BASE (MCLB) BARSTOW AND
THE CITY OF BARSTOW, CALIFORNIA
This is an Annex B to the Intergovernmental Support Agreement (IGSA) between the Marine Corps Logistics Base (MCLB) Barstow and the City of Barstow. This Annex B is made by and between the Commanding Officer, MCLB Barstow and the City of Barstow to establish a reimbursable relationship for drinking water and wastewater analysis services to support MCLB Barstow.
1. RESPONSIBILITIES OF THE PARTIES:
1.1.MCLB Barstow will:
1.1.1 Provide the City of Barstow with access to MCLB Barstow's relevant environmental permits to identify the general scope of services to be requested by MCLB Barstow and the applicable due dates for Orders to be placed with the City of Barstow. Services are generally required for twelve monthly sampling events, four quarterly sampling events, semi-annual, and annual sampling events; however, services requested by MCLB Barstow and required turnaround times (TATs) may vary from these permits, as deemed necessary by MCLB Barstow
1.1.2. Collect water and wastewater samples in accordance with its relevant permits and promptly store in Building 325 for pick-up by laboratory for analysis within ten (10) days of the applicable due date for permit compliance. Shorter TATs may be requested by MCLB Barstow prior to sample pick-up, and may be approved by the City of Barstow at the following rates (based on standard analytical costs):
1 DAY TAT: 200%
2 DAY TAT: 100%
3 DAY TAT: 50%
5 DAY TAT: 25%
7 DAY TAT: 10%
1.1.3. Be responsible for the proper packaging and chain of custody requirements preceding pick-up from laboratory.
1.1.4. Complete a Chain of Custody Form to accompany each required drinking water and Wastewater analysis requested from City of Barstow. The receipt of a completed Chain of Custody Form will initiate the TAT and dictate any applicable TAT rate premiums for required analysis.
1.1.5. Be responsible for incorporating laboratory results received from the city of
11.a
Packet Pg. 454 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of Barstow in all quarterly, semi-annual and annual reports due to the State of California Water Resources Board on the last day of the following month, and submitting those reports.
1.2. The City of Barstow will:
1.2.4. Provide drinking water and wastewater analysis of samples provided by MCLB Barstow at a laboratory meeting the State of California certification requirements, as reflected in applicable MCLB Barstow permits.
1.2.5. Perform sampling analysis according to applicable MCLB Barstow permits and amendments, and as reflected in Chain of Custody Forms received from MCLB Barstow. In the event of conflict between the permit requirements and the Chain of Custody Form, the City of Barstow will defer to what is requested in the Chain of Custody Form.
1.2.6. Promptly begin providing the services as soon as an Order is received from MCLB Barstow and accepted. Other than requests for shorter TAT on samples, the City of Barstow will accept all Orders placed by MCLB Barstow for services covered by this IGSA.
1.2.7. Minimize delays in the provision of services and/or any sub-standard quality analysis of MCLB Barstow samples, to the extent possible. In the event delays are expected or sub-standard services are provided, the City of Barstow shall immediately remedy and handle in accordance with Quality Control and Inspection procedures.
1.2.8. Adhere to the services requested and prices reflected in a Chain of Custody Form, as written. The City of Barstow will not perform any work not contemplated or included in
the scope of services, or in excess of the dollar amount reflected in the Order, without prior written approval from the IGSA Agreement Manager or Ordering Officer on an approved IGSA Order Modification. Any work performed or cost runovers that have not received advance written approval from the IGSA Agreement Manager or Ordering Officer will be at the expense of the City of Barstow.
1.2.9. Subject to shorter TAT premiums, as applicable, provide laboratory results to MCLB Barstow in accordance with the following deadlines, unless otherwise reflected in the Chain of Custody Form:
1.2.9.1. Laboratory results for water shall be submitted to MCLB Barstow by the 5th day of the month following receipt of a Chain of Custody Form. For example, laboratory results for sample picked up by laboratory in February are due March 5th, and laboratory results for samples picked up by laboratory in March are due April 5th. If the 5th day of the month is a holiday or falls on a weekend, the City of Barstow shall provide laboratory results to MCLB Barstow within three workdays occurring after the weekend or holiday.
11.a
Packet Pg. 455 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
1.2.9.2.Laboratory results for wastewater shall be submitted to MCLB Barstow by the 15th day of the month following receipt of a Chain of Custody Form.
For example, laboratory results for samples picked up by laboratory in February is due on March 15th, and laboratory results for samples picked up by laboratory in March are due on April 15th. If the 15th day of the month is a holiday or falls on a weekend, the City of Barstow shall provide laboratory results to MCLB Barstow within three workdays occurring after the weekend or holiday.
1.2.9.3.Sampling dates shall be coordinated with the Chief Plant Operator to make sure results are provided as required.
1.2.10. Anticipate, and be prepared to provide analytical services for, the following parameters at a minimum:
Monthly: phenols, Total Dissolved Solids (TDS), Total Suspended Solids (TSS), Biological Oxygen Demand (BOD), oil and grease, Chemical Oxygen Demand (COD), and Methylene Blue Active Substances (MBAS).
Quarterly: ammonia, Total Kjeldahl Nitrogen (TKN), nitrate, volatile organic compounds (VOC), oil and grease, COD, phenols, TDS, BOD, and MBAS.
Semi-Annually: chloride, fluoride, sulfate, chromium 6, total chromium, hardness, calcium, magnesium, sodium and boron, ammonia, TKN, nitrate, voe, oil and grease, COD, phenols, TDS, BOD, and MBAS.
Annually: Semi Volatile Organic Component, antimony, arsenic, barium, beryllium, cadmium, cobalt, copper, lead, molybdenum, nickel, selenium, silver, thallium, vanadium, and mercury, chloride, fluoride, sulfate, chromium 6, total chromium, hardness, calcium, magnesium, sodium, boron, ammonia, TKN, nitrate, voe, oil and grease, COD, phenols, TDS, BOD, and MBAS.
MCLB Barstow may add or reduce the parameters and sampling frequency as necessary according to permit requirements.
1.2.11. Expect one resampling effort per quarter for a total of four resampling events at the discretion of MCLB Barstow.
1.2.12. As the current lab contract comes to an end, the City will begin the new term for the award of a competitive contract. Once complete the City of Barstow and MCLB Barstow will be required to modify this agreement with the new cost adjustments.
1.3. Both parties will:
1.3.4. Cooperate to ensure mutual goals are met and issues are promptly resolved.
11.a
Packet Pg. 456 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
1.3.5. Promptly notify the other party of any concerns and communicate openly and transparently to ensure any concerns or issues are promptly dealt with in order to not impede performance under this IGSA.
1.3.6. Resolve to try to work out disputes to the extent feasible before initiating termination procedures.
1.3.7. To the extent permitted by the laws governing each party, the parties shall protect personal information and also shall maintain the confidentiality of other exchanged information when requested to do so by the providing party.
1.3.8. Comply with public requests for information related to this IGSA pursuant to the Freedom of Information Act, 5 U.S.C. §552.
11.a
Packet Pg. 457 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
ANNEX C FOR LIQUEFIED PETROLEUM (LPG) GAS SERVICES TO
INTERGOVENRMENTAL SUPPORT AGREEMENT (IGSA) BETWEEN MARINE CORPS
LOGISTICS BASE (MCLB) BARSTOW
AND
THE CITY OF BARSTOW, CALIFORNIA
This is an Annex C to the Intergovernmental Support Agreement (IGSA) between the Marine Corps Logistics Base (MCLB) Barstow and the City of Barstow. This Annex C is made by and between the Commanding Officer, MCLB Barstow and the City of Barstow to establish a reimbursable relationship for purchase of Liquefied Petroleum Gas (LPG) to support MCLB Barstow.
1. RESPONSIBILITIES OF THE PARTIES:
1.1. MCLB Barstow will:
1.1.1. Provide a detailed scope of services to be obtained and the period of performance required.
1.1.2. Obligate full funding required to furnish the services described in the scope of services.
1.1.3. Negotiate with the City of Barstow to ensure a fair and reasonable price for the services ordered and obtained. Validate the final negotiated amount required to furnish the scope of services applicable price and employ cost analysis techniques as determined necessary to protect the interests of the Marine Corps and the United States.
1.1.4. Pay the City of Barstow within 30 days of receipt of periodic invoices for services rendered and accepted by MCLB Barstow.
1.2. The City of Barstow will:
1.2.1. Provide a full LPG service for a not-to-exceed (NTE) 100,000 gallons a year.
1.2.2. Provide a firm-fixed price supply requirement contract with an economic price adjustment to supply and deliver LPG, which includes rental of tanks and associated equipment.
1.2.3. Furnish all labor, equipment, transportation, supplies, and materials necessary to deliver bulk liquid propane into contractor furnished and MCLB Barstow furnished property storage tanks at various locations as called for under this contract.
11.a
Packet Pg. 458 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
1.2.4. Meet Industry Standard 2.1 UN 1075, Non-corrosive and Odorized. It is the responsibility of the contractor to ensure the industry standards are met.
1.2.5. Deliver to the Marine Corps Logistics Base, Barstow, CA at various locations.
1.2.6. Provide the quantity of LPG required, but will vary depending upon the average temperatures, with more LPG usage during colder winters.
1.2.7. Not be obligated to continue the delivery of bulk propane under the contract, or otherwise deliver quantities, in excess of the NTE quantity of 100,000 gallons per year, unless the City of Barstow with MCLB Barstow Public Works Department approval (i) notifies the contractor, in writing, that the NTE quantities have been increased and (ii) provide a revised NTE total quantity for the line item(s) under the contract/delivery order.
1.2.8. Provide contractor furnished property and shall be provided at no charge to MCLB Barstow, except as may be expressly provided here under. Such contractor furnished property shall be delivered to MCLB Barstow at the locations designated. MCLB Barstow reserves the right to re-designate locations at which the contractors furnish property is to be located.
1.2.9. In the event that any contractor furnished property tanks are removed and replaced by the contractor, the contractor shall ensure that MCLB Barstow is provided an amount of LPG in the replacement tanks equivalent to the amount of LPG in the removed tank at no cost to MCLB Barstow.
1.2.10. Provide all costs to maintain contractor furnished property and correct tank discrepancies shall be borne by the contractor, including the inspection of contractor owned tanks during refueling.
1.2.11. Be responsible for maintenance, inspection, and/or repair of all contractors furnished property utilized during the performance of this contract.
1.2.12. Be responsible for training MCLB Barstow base employees on the proper use of equipment.
1.2.13. Conduct inspections of contractor owned tanks in accordance with industry standards.
1.2.14. Establish a means in which to account for the property. A copy shall be provided to the MCLB Barstow five (5) days prior to the date of the first
11.a
Packet Pg. 459 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of delivery. When additional tanks are installed, the contractor shall advise MCLB Barstow in writing as to the serial numbers, locations, and size of all tanks within five (5) days after their installation and upon any changing of tanks thereafter.
1.2.15. Provide additional contractor furnished tanks to be installed or the removal of already installed if such tanks are no longer required. The City of Barstow shall notify the contractor fifteen (15) days prior to requested additions or reductions. Should it become necessary for the contractor to remove its tanks, MCLB Barstow shall be reimbursed for the unused propane remaining in the tanks being removed.
1.2.16. Be responsible for all costs of delivery and installation of new tanks, including but not limited to, off-loading the tanks, setting, mounting, and stabilizing of tanks and all necessary connections.
1.2.17. Not fill tank to full capacity during summer months 1 June through 30 September. In the event this does happen and MCLB Barstow has to dispatch Emergency Service personnel to cool the tank, the contractor will absorb all costs associated with Emergency Services. The City of Barstow will not be responsible for any costs or damages associated with the incident or Emergency Services.
1.2.18. Conduct annual safety training for all personnel that will be using LPG for Forklift refueling operations.
1.2.19. Obtain service contact on a competitive basis.
1.3. Both parties will:
1.3.1. Cooperate to ensure mutual goals are met and issues are promptly resolved.
1.3.2. Promptly notify the other party of any concerns and communicate openly and transparently to ensure any concerns or issues are promptly dealt with in order to not impede performance under this IGSA.
1.3.3. Resolve to try to work out disputes to the extent feasible before initiating termination procedures.
1.3.4. To the extent permitted by the laws governing each party, the parties shall protect personal information and shall maintain the confidentiality of other exchanged information when requested to do so by the providing party.
11.a
Packet Pg. 460 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
1.3.5. Comply with public requests for information related to this IGSA pursuant to the Freedom of Information Act, 5 U.S.C. §552.
ANNEX D FOR UNIFORM RENTAL SERVICE TO INTERGOVENRMENTAL SUPPORT
AGREEMENT (IGSA) BETWEEN MARINE CORPS LOGISTICS BASE (MCLB)
BARSTOW
AND
THE CITY OF BARSTOW, CALIFORNIA
This is Annex D to the Intergovernmental Support Agreement (IGSA) between the Marine Corps Logistics Base (MCLB) Barstow and the City of Barstow. This Annex D is made by and between the Commanding Officer, MCLB Barstow and the City of Barstow to establish a reimbursable relationship with uniform rental services to support MCLB Barstow.
1. RESPONSIBILITIES OF THE PARTIES:
1.1. The MCLB Barstow will:
1.1.1. Provide a detailed scope of services to be obtained and the period of performance required.
1.1.2. Obligate full funding required to furnish the services described in the scope of services.
1.1.3. Negotiate with the City of Barstow to ensure a fair and reasonable price for the services ordered is obtained. Validate the final negotiated amount required to furnish the scope of services applicable price and cost analysis techniques as determined necessary to protect the interests of the Marine Corps and the United States.
1.1.4. Pay the City of Barstow within 30 days of receipt of periodic invoices for services rendered and accepted by MCLB Barstow.
1.2. The City of Barstow will:
1.2.1. Provide a full uniform rental service for an estimated 60 employees that includes:
11.a
Packet Pg. 461 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
1.2.2. 45 employee uniforms consisting of 11 Flame Resistant (FR) rating ATPV
8.6 or above rated shirts (long sleeves) and 11 FR rating 20.7 or above 100% cotton blue jeans/kakis each. Provide 12 Flame Resistant FR 80 Cal arch flash suit, hood, and balaclava.
1.2.3. 15 employee uniforms consisting of 11 non-FR shirts (short or long sleeves) and 11 nonFR pants each.
1.2.4. Provide each employee with one perm-lined FR/NONFR panel jacket.
1.2.5. Add name tags to all non-Arc Flash shirts.
1.2.6. The quantities are estimates for acquainting the service provider with probable quantities to be expected during the agreement period. The proposed quantities may be subject to additions or deletions.
1.2.7. Measure each employee for specific size and issues.
1.2.8. Make weekly deliveries to pick up soiled uniforms and drop off clean uniforms.
1.2.9. If employee gains or loses weight, employee will be re-measured for proper size with an additional cost to the government of $5.00.
1.2.10. If uniform becomes damaged due to non-normal wear and tear the service provider will replace with an additional cost to the government of $5.00.
1.2.11. If employee leaves and is replaced by a new employee, service provider will then measure and provide new uniform to new employee with an additional cost to the government of $0.50 per garment.
1.2.12. All normal wear and tears will be the service provider’s responsibility to replace without additional cost to the government.
1.2.13. Each location will have a laundry bank to put in soiled uniforms for service.
1.2.14. The service provider will always maintain inventory control for each employee so that uniforms have been assigned.
1.2.15. Service provider will deliver the estimated 60 uniforms to three different locations. The uniforms will be delivered to Nebo Annex Building 196, Yermo Annex Building 573, and Yermo Annex Building 608.
11.a
Packet Pg. 462 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
1.2.16. Obtain service contact on a competitive basis.
1.3. Both parties will:
1.3.1. Cooperate to ensure mutual goals are met and issues are promptly resolved.
1.3.2. Promptly notify the other party of any concerns and communicate openly and transparently to ensure any concerns or issues are promptly dealt with in order to not impede performance under this IGSA.
1.3.3. Resolve to try to work out disputes to the extent feasible before initiating termination procedures.
1.3.4. To the extent permitted by the laws governing each party, the parties shall protect personal information and shall maintain the confidentiality of other exchanged information when requested to do so by the providing party.
1.3.5. Comply with public requests for information related to this IGSA pursuant to the Freedom of Information Act, 5 U.S.C. §552.
11.a
Packet Pg. 463 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
ANNEX E FOR MATERIALS AND SERVICES TO INTERGOVERNMENTAL SUPPORT
AGREEMENT (IGSA) BETWEEN MARINE CORPS LOGISTICS BASE (MCLB)
BARSTOW
AND
THE CITY OF BARSTOW, CALIFORNIA
This is an Annex E to the Intergovernmental Support Agreement (IGSA) between the Marine Corps Logistics Base (MCLB) Barstow and the City of Barstow. This Annex E is made by and between the Commanding Officer, MCLB Barstow and the City of Barstow to establish a reimbursable relationship for purchase of Materials and Services (M&S) support MCLB Barstow. Total purchase costs are not to exceed $250,000 per quarter.
1. RESPONSIBILITIES OF THE PARTIES:
1.1. MCLB Barstow will:
1.1.1. Provide a detailed scope of work or itemized quote for M&S to be procured for facility maintenance repair.
1.1.2. Obligate full funding to furnish the required M&S and agreed upon fee from City of Barstow.
1.1.3. Pay the City of Barstow within 30 days of receiving approved invoices for accepted services.
1.2. The City of Barstow will:
1.2.1. Execute agreed-upon work as outlined in the scope of work.
1.2.2. Provide M&S to MCLB Barstow.
1.2.3. Furnish a firm-fixed price contract with an economic price adjustment for materials and services.
1.2.4. Supply all labor, equipment, transportation, supplies, and materials necessary to deliver the requested M&S.
1.2.5. Procure services on a competitive basis ensuring quality and cost-effectiveness.
1.3. Both Parties will:
1.3.1. Cooperate to ensure mutual goals are met and issues are promptly resolved.
11.a
Packet Pg. 464 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
1.3.2. Notify the other party of any concerns and communicate transparently to address issues.
1.3.3. Resolve disputes amicably before initiating termination procedures.
1.3.4. Protect personal information and maintain confidentiality when requested, in compliance with applicable laws.
1.3.5. Respond to public requests for IGSA-related information under the Freedom of Information Act (FOIA).
11.a
Packet Pg. 465 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of
ANNEX F FOR GENERAL FACILITY CONSTRUCTION SERVICES TO
INTERGOVENRMENTAL SUPPORT AGREEMENT (IGSA) BETWEEN MARINE CORPS
LOGISTICS BASE (MCLB) BARSTOW
AND
THE CITY OF BARSTOW, CALIFORNIA
The purpose of this Annex is to authorize the Marine Corps Logistics Base (MCLB) Barstow Commanding Officer, in consultation with the City Manager for the City of Barstow, to authorize the City of Barstow to perform public works projects and provide General Facility Construction Services at MCLB Barstow.
The parties execute this Annex in order to provide services, supplies, or construction to the United States, to achieve cost savings for the Department of the Marine Corps, and to provide additional revenues to local governments and their work forces.
RESPONSIBILITIES OF THE PARTIES:
MCLB Barstow will provide a formal Request for Proposal to (RFP) to City of Barstow to acquire the stated service. The RFP will state the detailed requirement of the service in forms of statement of work, technical reference, and period of performance, and which might also include but not limited to drawing and schematics. City of Barstow will review the RFP package and provide formal requests for information (RFI) to clarify any specific requirements that relate to the RFP. City of Barstow will provide a cost proposal corresponding to the RFP and RFIs. Once MCLB Barstow deems the proposal awardable, MCLB Barstow will issue an Approved Purchase Request from the accounting system to serve as a Purchase order for City of Barstow to proceed with the service. MCLB Barstow is only obligated to the dollar amount that is stated on the Purchase order if the provided service meets and exceeds the requirements that are stated on the RFP and RFIs.
The City of Barstow shall perform public works projects of up to one million dollars ($1,000,000) in value per project at MCLB Barstow with the written approval of the Commanding Officer and the City Manager. Public works projects worth greater than one million dollars require the additional approval of the Barstow City Council. The value of the public works projects to be performed by the City of Barstow shall be measured by the amount budgeted for the project by the United States.
This is a non-personal services agreement. Each party is responsible for all costs of its personnel including pay, benefits, support, and travel. Each party is responsible for supervision or management of its personnel.
The tasks, duties and responsibilities set forth in this Annex F may not be interpreted or implemented in any manner that results in City of Barstow personnel creating or modifying
11.a
Packet Pg. 466 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of federal policy, obligating appropriated funds of the United States, or overseeing the work of federal employees.
Under no circumstances shall City of Barstow employees or contractors be deemed federal employees. If the City of Barstow shall provide services through a contract, the contract must be awarded through competitive procedures. (This requirement does not apply to collective bargaining agreements between the City of Barstow and its employees.) Employees of the United States may not perform services for or on behalf of the City of Barstow without the approval of the IGSA Manager.
TERM OF AGREEMENT:
The term of this Agreement shall be for one year from the execution of the Agreement by the IGSA Manager, and renewable for successive one-year periods for 9 additional years. The United States shall only be obligated for only one year of performance under the agreement, as it has no authority to obligate additional periods of performance without appropriation of adequate funds by the Congress. The United States shall only be obligated for an additional year of performance upon receipt of such funds, and only upon written notice by the IGSA Manager of an intent to award the option for an additional year of performance. The IGSA Manager shall provide notice of the renewal of the IGSA at least 30 days prior to the expiration of the current performance period. The IGSA Manager may condition the renewal upon availability of funds and may suspend performance of the renewed period at no additional cost to the United States, until adequate funds have been received. If funds are not received, the parties agree that the Agreement can be unilaterally terminated by the IGSA Manager without further liability to the United States.
TERMINATION:
This Annex F may be terminated by mutual written agreement at any time. Except as otherwise specified in this agreement, either party can unilaterally terminate this Annex F upon 30 days written notice to the POCs designated in this Agreement.
The United States reserves the right to terminate this agreement for its convenience at any time.
When notified by the IGSA Manager of the termination, the City of Barstow shall immediately stop all work. The government will pay the City of Barstow a percentage of the agreed price reflecting the percentage of work performed to the notice and associated reasonable termination costs. The City of Barstow shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
PAYMENT:
Work performed by the City of Barstow under this Annex F shall accord with the same payment process as detailed in the IGSA, except that all invoices properly submitted by the City shall be paid by the United States within 30 days.
OPEN COMMUNICATIONS AND QUALITY CONTROL:
11.a
Packet Pg. 467 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of The Parties shall identify and present any issues and concerns that could potentially impede successful performance of the Annex in a timely and professional manner. The City of Barstow shall maintain a quality control plan to ensure all work is completed within the specified timelines and quality standards specified in the Annex.
INSPECTION OF SERVICES: The City of Barstow will only offer tender services and goods in conformance with the IGSA and Annex. The installation shall appoint a Technical Representative (“TR”) who will be responsible for inspecting all services performed. The City of Barstow will be notified of the identity of the TR and their alternate, of any changes. If services are performed outside the installation, the TR shall be granted access to areas where services are performed.
The TR shall have the right to inspect and test all services; inspections and tests to be conducted in a manner that will not unduly delay the performance of work.
If the TR determines that services do not conform to the requirements in Agreement and the Annex, the TR can require the City of Barstow to perform the services again, in whole or in part, at no additional cost to the government. Alternatively, the TR can reduce the price to be paid for services to reflect the reduced value of the services to be performed. If the services cannot be corrected by re-performance, the TR can reduce the billed price to reflect the reduced value of the services to be performed. The TR may alternately, in his sole discretion, waive price reductions or re-performance of services. Such waivers shall not constitute a waiver of requirements in the IGSA unless approved in writing by the IGSA Manager.
If the City of Barstow is unable to perform any of the services due to an occurrence beyond the reasonable control of the parties, such as Acts of God, unusually severe weather, or government activities on the installation which impede the City of Barstow’s performance, the City of Barstow shall promptly notify the TR.
In those rare instances in which the City of Barstow fails to re-perform services or abandons performance, the United States may perform or contract for performance of the services and charge those costs to the City of Barstow. Except in an emergency, the United States will not exercise this authority without providing prior notice to the POC designated by the City of Barstow to allow for amicable resolution of issues between the parties. If services are deemed to be deficient and cannot be corrected to the satisfaction of the TR, the Agreements Officer may terminate the IGSA immediately. Such termination shall not become effective without prior notice and consultation with the City of Barstow POC identified in this agreement.
SUSPENSION OF ANNEX:
The United States reserves the right to suspend performance of the agreement or access to the installation in event of emergencies, mobilizations, national security reasons, or for other reasons outside the control of the United States. The City of Barstow will be entitled to an extension of time to for completion of the Services and shall be extended based upon the impact of the delay or suspension and shall receive an equitable compensation adjustment. In the event either party is
11.a
Packet Pg. 468 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of unable to perform its obligations under the terms of this Agreement because of acts of God, strikes, equipment or transmission failure or damage reasonably beyond its control, or other causes reasonably beyond its control, such party shall not be liable for damages to the other for any damages resulting from such failure to perform or otherwise from such causes.
APPLICABLE LAW:
The Annex is subject to the law and regulations of the United States. If any federal statue expressly prescribes policies or requirements that differ from the terms and conditions of this Annex, the provisions of the statute shall govern.
CLAIMS AND DISPUTES:
The parties shall adhere to the same claim and dispute process as outlined in the IGSA.
AMENDMENTS TO THE IGSA:
Any party can propose amendments at any time. All amendments must be reduced to writing, agreed upon by the parties, and incorporated by amendment to Agreement by the IGSA Manager in order to be effective.
DUTY TO PROTECT GOVERNMENT PROPERTY ON THE INSTALLATION:
The requirement of the City of Barstow to conduct a site visit of the installation with the Technical Representative and prepare an accident-avoidance plan for the IGSA shall also cover the annex and no additional site visit or accident-avoidance plan is required to be carried out by the Public Partner for the Annex.
The City of Barstow shall take measures to protect and not damage any property of the United States during performance of services. Should the City of Barstow damage such property, the City of Barstow may replace the item or restore it to its prior condition at its own cost or reimburse the United States for such costs. If the City of Barstow does not take measures to replace or restore, the United States reserves the right to deduct replacement or restoration costs from amounts billed by the City of Barstow each month. The CR shall provide written notice of the Government's intent to offset costs against billings to allow the parties to resolve the matter amicably. Such resolution can include a schedule for payments to cover the loss or restoration of Government property over the term of the current period of performance.
CONTINUITY OF SERVICES:
The City of Barstow recognizes that the services under this Agreement are vital to the United States and must be continued without interruption and performed even in event of a dispute between the parties. Should the United States terminate this Agreement for any reason, the City of Barstow agrees to furnish phase-in training to any successor contractor and exercise its best efforts and cooperation to affect an orderly and efficient transition of services.
HOLD HARMLESS:
Except as otherwise provided in this annex, the City of Barstow shall indemnify and hold the United States harmless against any and all judgments, expenses, liabilities, claims and charges of
11.a
Packet Pg. 469 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of whatever kind or nature that may arise as a result to the extent of the City of Barstow negligence, willful acts or misconduct of the activities of the City of Barstow or its employees and subcontractors in performance of this Agreement.
INSURANCE: The insurance provided by the City of Barstow to the United States under the IGSA shall also cover all work performed under this Annex.
WAGES AND LABOR LAW PROVISIONS:
The City of Barstow shall adhere to the same Wage and Labor Provisions as outlined in the IGSA.
NON-DISCRIMINATION AND SEXUAL ASSAULT/HARASSMENT:
The Public Partner and its contractors shall adhere to the same Non-Discrimination and Sexual Assault/Harassment provisions as outlined in the IGSA.
TRANSFERABILITY: This Annex is not transferable except with the written authorization of the IGSA Manager.
ACTIONS OF DESIGNEES: Any act described in the Annex to be performed by an individual or official can be performed of the designee of such individual or official, with the exception of the Agreements Officer.
11.a
Packet Pg. 470 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of Description Regular Rate OT Rate Basis Per Hour Total#
Striping - 6 Person Crew $67.32 $100.98 Time-Based $403.93 Description Regular Rate OT Rate Basis Per Hour Total#
Travel Time $67.32 $100.98 Time-Based $403.93
Description Regular Rate OT Rate Basis Per Hour Total#
Project Administration - Street Dept. $71.57 $107.35 Time-Based $71.57 Project Administration - Finance Dept. $53.83 $80.74 Time-Based $53.83 Description Hourly Rate Basis Per Hour Total#
Striping Truck $57.58 Time-Based $57.58
Fuel - Striping Truck $5.76 Time-Based $5.76
Description Basis Material Total
Striping - Materials Actual Cost + 15% Actual Cost + 15% #
Per Hour Total is calculated at regular rate. Hourly OT rate is calculated by multiplying Regular Rate by 1.5.
Description Regular Rate OT Rate Basis Per Hour Total#
Crack Sealing - 5 Person Crew $67.32 $100.98 Time-Based $336.61 Description Regular Rate OT Rate Basis Per Hour Total#
Travel Time $67.32 $100.98 Time-Based $336.61
Description Regular Rate OT Rate Basis Per Hour Total#
Project Administration - Street Dept. $71.57 $107.35 Time-Based $71.57 Project Administration - Finance Dept. $53.83 $80.74 Time-Based $53.83 Description Rate Basis Per Hour Total#
Fleet Truck $55.55 Time-Based $55.55
Fuel - Fleet Truck $5.55 Time-Based $5.55
Crack Sealer $71.42 Time-Based $71.42
Fuel - Crack Sealer $7.14 Time-Based $7.14
Description Basis Material Total
Crack Sealing - Materials Actual Cost + 15% Actual Cost + 15% #
Per Hour Total is calculated at regular rate. Hourly OT rate is calculated by multiplying Regular Rate by 1.5.
Description Regular Rate OT Rate Basis Per Hour Total#
Pothole Repair - 2 Person Crew $67.32 $100.98 Time-Based $134.64 Description Regular Rate OT Rate Basis Per Hour Total#
Travel Time $67.32 $100.98 Time-Based $134.64
Description # of Employees Regular Rate OT Rate Basis Per Hour Total# Project Administration - Street Dept. 1 $71.57 $107.35 Time-Based $71.57 Project Administration - Finance Dept. 1 $53.83 $80.74 Time-Based $53.83 Description Rate Basis Per Hour Total
Fleet Truck $55.55 Time-Based $55.55
Fuel - Fleet Truck $5.55 Time-Based $5.55
Description Basis Material Total
Pothole Repair - Materials Actual Cost + 15% Actual Cost + 15% #
Per Hour Total is calculated at regular rate. Hourly OT rate is calculated by multiplying Regular Rate by 1.5.
Public Works Cost For Right-of Way Maintenance
Striping Streets - Personnel
Crack Sealing* - Personnel
*Based on medium range cracking from 1/4" to 1-1/2". Cracks larger than 1 1/2" require Mastic Sealing Material. Traffic control included in cost.
Striping Streets - Equipment
# of Employees
5 Quantity
10% of Hourly Equipment Cost
Each
Project Administration - Personnel
Project Administration - Personnel
Striping Streets - Travel Time
Pothole Repair - Equipment
Each
10% of Hourly Equipment Cost
Quantity
# of Employees
2 Project Administration - Personnel
Pothole Repair - Personnel
Crack Sealing* - Equipment
Each
10% of Hourly Equipment Cost
Each
10% of Hourly Equipment Cost
Quantity
As Required By Project
Crack Sealing* - Travel Time
# of Employees
1 1
5 # of Employees
# of Employees
# of Employees
6 # of Employees
6 As Required By Project
STRIPING STREETS
CRACK SEALING*
POTHOLE REPAIR
Pothole Repair - Travel Time
# of Employees
2 Pothole Repair - Materials
Quantity
Striping Streets - Materials
Quantity
As Required By Project
Crack Sealing* - Materials
Quantity
1 1
Attachment 1
11.a
Packet Pg. 471 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of Amount
(Rounded Up Nearest Dollar) Administrative Fee
$0-$49,999 10%
$50,000-$99,999 9%
$100,000-$249,999 8%
$250,000-$499,999 7%
$500,000-$999,999 6%
$1,000,000-$1,999,999 5%
$2,000,000-$2,999,999 4%
Over $3,000,000 3%
Attachment 2
Annexes B, C, D and F
11.a
Packet Pg. 472 Attachment: IGSA - MCLB 11.3.26 (CC Staff Report Attachment) (6625 : Intergovernmental Support Agreement (IGSA) Between the City of Joint Meeting Council/BFPD
11/3/26 06:00 PM
City Clerk / Records
Maribel Hernandez
Other
Doc ID: 6650
AGENDA ITEM
AGENDA MATTER:
CONSIDERATION OF REMOVAL OF PLANNING COMMISSIONER TED WEASMA AND DIRECTION
REGARDING FILLING THE RESULTING UNSCHEDULED VACANCY
EXECUTIVE SUMMARY:
Mayor Silva has requested consideration of the Council of the removal of Planning Commissioner Ted Weasma from the Planning Commission. Barstow Municipal Code (BMC) section 2.24.040 provides that any member or alternate member of the Planning Commission may be removed by a majority of the City Council at the will and pleasure of the Council.
The Council is asked to decide whether Commissioner Ted Weasma should remain in office or be removed.
Options for the permanent and temporary appointment of a replacement if such vacancy by removal occurs are provided below.
BACKGROUND:
The Planning Commission consists of five regular members. The current Planning Commission consists of Paul Niemayer, Richard Bremen, Juan Antonio DeLucas, Bea Lint, and Ted Weasma as regular commissioners, and Andrew Ziemer and Marilyn Dyer Kruse as alternates. Mr. DeLucas’ term expires on December 31, 2026. The terms of Commissioners Weasma, Lint, and Niemeyer expire December 31, 2028. The terms of Commissioner Bremen and Alternates Ziemer and Dyer-Kruse expire December 31, 2029. The City Code and state law treat scheduled and unscheduled vacancies slightly differently.
On December 31, 2026, the seat of Commissioner DeLucas will expire as a regularly scheduled vacancy. BMC Section 2.24.035(a) requires that for scheduled vacancies, the vacancy shall be advertised and set timeframes for accepting applications. The City is currently accepting applications for the scheduled vacancy from October 19, 2026 through November 19, 2026.
BMC section 2.24.040 states:
“Any member or alternate member of the planning commission may be removed by a majority of the city council at the will and pleasure of such council.” For unscheduled vacancies, BMC Section 2.24.035(b) requires that the City comply with section 54974 of the Government Code, which requires that a notice be posted in the office of the City Clerk and either the City’s website or the local library within 20 days of such vacancy occurring. (Government Code section 54974(a).) Then, Council may make a final appointment to the vacant seat after at least 10 working days after the positing of the notice. (Government Code section 54974(a).) If however, the Council determines that an emergency exists, it may fill an unscheduled vacancy by appointing a member to serve on an acting basis until the permanent final appointment is made pursuant to the process in section 54974(a). (Government Code section 54974(b).) DISCUSSION:
12 Packet Pg. 473
Joint Meeting Council/BFPD
11/3/26 06:00 PM
City Clerk / Records
Maribel Hernandez
Other
Doc ID: 6650
AGENDA ITEM
Commissioners May Be Removed Without Cause
Commissioners serve at the will and pleasure of the Council. (BMC sec. 2.24.040.) No cause is required to replace a Planning Commissioner prior to the end of term. A simple majority of the City Council may remove a commissioner who serves at the will and pleasure of the Council.
If a commissioner is removed, that creates an unscheduled vacancy that must be filled pursuant to state law. (BMC sec. 2.24.035(b).)
Replacement Of A Commissioner Removed From Office Shall Be Filled Pursuant To The Process Under Government Code Section 54974
If the Council removes Mr. Weasma, the Council may select one of the following options regarding the seat:
1. Allow the vacancy to temporarily be filled by the alternates already appointed to serve when regular members are unavailable, notice the vacancy within 20 days, accept applications to fill the unscheduled vacancy, and then at least 10 working days thereafter at a public meeting appoint the final appointment to serve the remainder of the term through December 31, 2028
2. Declare the seat vacant, and not utilize the alternates currently appointed to fill in for regular members are unavailable, notice the vacancy within 20 days, accept applications to fill the unscheduled vacancy, and then at least 10 working days thereafter at a public meeting appoint the final appointment to serve the remainder of the term through December 31, 2028; or,
3. Find an “emergency” exists and appoint a successor to serve on an acting basis until the proper noticing under Gov Code sec. 54974 occurs, then notice the vacancy within 20 days, accept applications to fill the unscheduled vacancy, and then at least 10 working days thereafter at a public meeting appoint the final appointment to serve the remainder of the term through December 31, 2028.
Notice Required for Replacement of an Unscheduled Vacancy Under each of the above scenarios, the existence of the unscheduled vacancy needs to be noticed ahead of taking action to fill the final appointment. No noticing is required for taking action to fill the seat on an acting basis if an emergency is determined to exist, and no noticing is required to allow alternates to sit in the seat until the vacancy is filled.
If the unscheduled vacancy occurs on November 3, the last day to make the required posting of unscheduled vacancy would be November 23, 2026. There is no stated duration for the notice to be made. The Clerk could make such positing any date prior to November 23, 2026. Depending on the date of positing by the Clerk, the soonest that the City Council could take action would be November 24, 2026 (10 working days after November 4, 2026), and the latest would be December 14 (10 working days after November 23, 2026).
Alternatively, the Council may direct that the current open Recruitment period closing November 19 be amended to include the unscheduled vacancy. This would fulfill the requirement to provide notice within 20 days of the vacancy. The public notice and applicant communications should then be amended to clearly identify both seats and the different term lengths. Upon the close of the Recruitment period on November 19, Council would then have to treat the appointment of the two 12 Packet Pg. 474
Joint Meeting Council/BFPD
11/3/26 06:00 PM
City Clerk / Records
Maribel Hernandez
Other
Doc ID: 6650
AGENDA ITEM
positions slightly differently.
Appointment Process for Scheduled vs. Unscheduled Vacancies After the notice and application periods are over, the appointment of the scheduled and unscheduled positions are treated differently under the code.
As to the scheduled vacancy, the City code requires an ad hoc committee of two members be formed to select a commissioner to fil the vacancy, who is then presented to the Council for confirmation and appointment. (BMC sec. 2.24.035(a).)
As to the unscheduled vacancy, no ad hoc committee is used. The City code requires that Section 54974 be used, which does not require the ad hoc committee process, and only specifies the notice periods addressed above. (BMC sec. 2.24.035(b).) Appointment however is still made by the City Council. (BMC sec. 2.24.030.)
Coordination with Existing Council Meeting Schedule
The next Regular Council scheduled meetings of the City Council for the remainder of 2026 are on December 1 and December 15, and for the and Planning Commission December 28, 2026, though based on items on the current calendar this meeting likely will be cancelled.
ENVIRONMENTAL REVIEW
The proposed action is an organizational and administrative activity of government that does not constitute a project under the California Environmental Quality Act. (CEQA Guidelines, § 15378(b)(5).) FISCAL IMPACT:
No material fiscal impact is anticipated beyond ordinary staff time and the costs, if any, associated with vacancy notice and recruitment.
RECOMMENDED ACTION:
That the City Council, Consider whether to remove Planning Commissioner Ted Weasma pursuant to Barstow Municipal Code section 2.24.040. If removal is approved, provide direction regarding temporary coverage of the vacant seat and direct staff to post the required notice, amend the current Planning Commission recruitment to include the unscheduled vacancy, and return to the City Council for appointment to the unexpired term ending December 31, 2028, following completion of all required procedures.
12 Packet Pg. 475