This is an Intergovernmental Support Agreement (IGSA) between the Marine Corps Logistics Base (MCLB) Barstow and the City of Barstow. When referred to collectively, MCLB Barstow and the City of Barstow are referred to as the "Parties."
1. BACKGROUND:
MCLB Barstow’s Facilities Maintenance Branch (FMB) has an enduring, long-term requirement to provide the installation with building maintenance and repair sustainment. The FMB is challenged with limited personnel, availability of DoD-mandated vendors, and strict contracting and acquisition methods.
To address these challenges, specific materials, and services (M&S) that would enhance MCLB Barstow FMB productivity and are supportable by the City of Barstow including: uniform services (purchasing and upkeep), purchase of repair parts and hardware, facility repair materials exceeding $10,000 in value and maintenance and repair of roads and other linear structures, such as road striping, pothole repair, and crack filling. Historically, MCLB Barstow has contracted these services using the government credit purchase card (GCPC), but due to GCPC purchase thresholds, they cannot procure materials or services exceeding $10,000. This need has prompted the pursuit of installation support services through the City of Barstow, which has demonstrated similar capabilities in its existing IGSA with the Department of the Army at Fort Irwin, California.
MCLB Barstow has an enduring requirement to sample drinking water and wastewater generated on the installation from various treatment facilities and elsewhere. MCLB Barstow has historically contracted for analysis of these samples in accordance with permits issued by the State of California. The City of Barstow similarly has sampling and analysis requirements for its respective permits issued by the State of California and has existing laboratory capabilities sufficient to provide analytical services to MCLB Barstow. MCLB Barstow wishes to garner installation support services from the City of Barstow to assist with the installation's environmental compliance needs.
MCLB Barstow has a long-term requirement to provide the installation with Liquefied Petroleum Gas (LPG) to heat buildings, operate material handling equipment, and operate generators for wells. MCLB Barstow has historically contracted for LPG, but the General Services Administration determined that commercial and industrial LPG was out of scope for its vendors to provide out of the United States Marine Corps SERV Mart Stores. The City of Barstow similarly has requirements for LPG and has existing capabilities sufficient to provide services to MCLB Barstow. MCLB Barstow wishes to gamer installation support services from the City of Barstow to assist with the installation's LPG needs.
2. AUTHORITIES: This IGSA is entered into pursuant to Title 10 U.S.C. §2679 (formerly 10 U.S.C. §2336). It is governed by Department of Defense Instruction (DoDI) 4000.19.
3. PURPOSE: IGSA is made by and between the Commanding Officer, MCLB Barstow and the City of Barstow to establish a reimbursable relationship between MCLB Barstow and the City of Barstow. This IGSA will support the purchasing of Materials and Services (M&S) to support MCLB Barstow’s facilities maintenance and construction requirements, drinking water and wastewater analysis services to support MCLB Barstow, uniform services to support MCLB Barstow, road maintenance and repair to support MCLB Barstow, and support for the purchase of Liquefied Petroleum Gas (LPG) to support MCLB Barstow.
4. DEFINITIONS: The term “Order” means a request under the overarching terms of the IGSA for specific Material and Services, Wastewater and drinking water analyses, Liquified petroleum gas, Road maintenance and repair, and General Facility Construction Services.
5. RELATIONSHIP OF THE PARTIES:
Each Party acts in an independent capacity and is not considered the officer, agent, or employee of the other. Costs for personnel and contractors, including pay, benefits, and travel, are the responsibility of each respective Party.
In the exercise of their respective rights and obligations under this IGSA, each Party acts in an independent capacity, and neither is to be considered the officer, agent, or employee of the other.
Each Party is responsible for all costs of its personnel and contractors, including pay and benefits, support, and travel. Neither party shall provide, without the written consent of the other party, any contractor or employee with a release that waives or purports to waive any rights a party may have to seek relief or redress against that contractor or employee.
6. GENERAL PROVISIONS:
6.1. POINTS OF CONTACT (POCs): The following points of contact (POC) will be used by the Parties to communicate in the implementation of this IGSA. Each Party may change its POC upon a reasonable notice to the other Party.
6.1.1. For MCLB Barstow:
6.1.1.1 Support Agreements Manager: 760-577-6168
6.1.1.2 Operations Officer: 760-577-5406
6.1.1.3 Facilities Manager: 760-577-6544
6.1.2. For the City of Barstow:
6.1.2.1 Primary POC: Andrew Espinoza, Interim General Manager of Environmental Service (EMAIL) 760-255-5157)
6.1.2.2 Alternate POC: Wesley Garrison, Operations and Maintenance Superintendent ([email protected], 760-577-4588)
6.2. CORRESPONDENCE: All correspondence to be sent and notices given pursuant to this IGSA will be addressed, if to the MCLB Barstow, too
6.2.1. for MCLB Barstow:
Commanding Officer
Business Performance Office (B440)
ATTN: Support Agreements Manager
Box 110115
Barstow, CA 92311-5050
6.2.2. For the City of Barstow:
City Manager, Rochelle Clayton
Phone – (760)255-5101
Email – [email protected]
Community Development Director, Chris Heldreth
Phone – (760)255-5169
Email – [email protected]
Public Works Superintendent, Tom Alva
Phone – (760)255-5140
Email – [email protected]
Field Services Supervisor, Jason Miller
Phone – (760)255-5142
Email – [email protected]
City of Barstow
220 E. Mountain View St.
Barstow, CA 92311
7.3. RECORDS:
7.3.1. The parties shall follow established procedures in accordance with permits for maintaining books, records, documents, or other evidence pertaining to costs and expenses under this IGSA and Orders hereunder for a minimum of three years after the expiration of the IGSA.
To the extent permitted under applicable Federal laws and regulations, the parties shall each allow the other to inspect such books, records, documents, or other evidence.
8. FINANCIAL DETAILS
8.1. As of the effective date of this IGSA, the costs for all efforts to be ordered hereunder are estimated to be a yearly cost of $1,650,000. This amount is an estimate only that is subject to adjustment by the Parties and is not to be construed as the total financial responsibilities of MCLB Barstow, or the limits of MCLB Barstow’s needs in a given year.
8.2. This IGSA does not document the obligation of funds between the Parties. Any obligation of funds in support of this IGSA will be accomplished using City of Barstow invoices, and upon the certification of an amount of funds on a Purchase Request and Commitment (PR&C) document by a proper funds certifying officer appointed by the Marine Corps, the signature of an individual Order by the IGSAAgreement Manager or IGSA Ordering Officer, and acceptance of the Order by the City of Barstow for the scope of services delineated on the individual Order. The obligation of funds by the Parties is subject to the availability of appropriate funds pursuant to the DoD Financial Management Regulation. No provision in this IGSA will be interpreted to require obligation or payment of funds in violation of the Anti-Deficiency Act, Section 1341 of Title 31, United States Code.
8.3. Billing and Payment: The City of Barstow will submit monthly invoices at the approved prices for services accepted and rendered during the preceding month. Upon receipt of an invoice from the City of Barstow, MCLB Barstow will remit payment within thirty (30) days of receipt.
9. EFFECTIVE DATE: This IGSA takes effect beginning on the day after the last party signs.
10. REVIEW OF AGREEMENT: This IGSA will be reviewed annually on or around the anniversary of its effective date for financial impacts and triennially in its entirety.
11. MODIFICATION OF IGSA: The terms and conditions of this IGSA may only be modified by the written agreement of the parties, dually signed by their authorized representatives.
This IGSA will be reviewed annually on or around the anniversary of its effective date for financial impacts; if there are substantial changes in resource requirements, the agreement will be reviewed in its entirety.
12. TERMINATION: This IGSA may be terminated early by either party with a minimum 30 calendar days written notice. The IGSA automatically terminates after ten years from the effective date of the agreement.
13. DISPUTES
13.1. If the Parties are unable to agree about interpreting or applying a material aspect of either this IGSA or an Order, the parties agree to engage in an effort to reach mutual agreement in the proper interpretation of this IGSA or the Order, including amendment or termination of this IGSA or the Order, as necessary, or by escalating the dispute within their respective organizations.
13.2. As a condition precedent to a party bringing any action for breach of this Agreement, that party must first notify the other party in writing of the nature of the purported breach and seek in good faith to resolve the dispute through negotiation. If the parties cannot resolve the dispute through negotiation, they may agree to a mutually acceptable method of non-binding alternative dispute resolution with a qualified third party acceptable to the parties. Each party shall pay an equal share of any costs for the services provided by such a third party as such costs are incurred.
13.3. Contractor or employee disputes: All claims and disputes by employees of the City of Barstow, shall be resolved in accordance with state law and local governing policies and procedures. All claims and disputes by contractors arising under or relating to contracts awarded by the City of Barstow pursuant to or related to this IGSA and Orders hereunder, shall be resolved in accordance with state law and the terms of the individual contract. All litigation costs, including settlements and judgments, incurred or agreed to in defense of claims and disputes made by contractors and employees of the City of Barstow are the responsibility of the City of Barstow unless otherwise agreed to in writing by the MCLB Barstow Commander.
13.4. In the event of any third-party dispute or litigation relates to or potentially affects the ability to perform under, this IGSA, the Parties agree to promptly notify each other.
The existence of such a dispute or litigation shall not excuse the parties from performance pursuant to this IGSA or the Orders hereunder.
14. LIABILITY: The City of Barstow agrees and shall hold and save the MCLB Barstow free from all damages, claims, suits of whatsoever nature arising from or incidental to this IGSA and Orders hereunder, except for damages due to the fault or negligence of the MCLB Barstow or its employees. Nothing in this Agreement is intended, nor may be construed, to create any rights, confer any benefits, or relieve any liability, of any kind whatsoever in any third person not a party to this IGSA.
15. ENTIRE AGREEMENT: It is expressly understood and agreed that this IGSA embodies the entire agreement between the Parties regarding the IGSA’s subject matter, thereby merging and superseding all prior agreements and representations by the Parties with respect to such subject matter.
16. ANNEXES:
(1): Annex A Road Maintenance and Repairs (to rescind and replace former contract) (2): Annex B Lab Services for Water and Wastewater Testing (to rescind and replace former contract)
(3): Annex C Liquefied Petroleum Gas
(4): Annex D Uniform Services (to rescind and replace former contract) (5): Annex E Materials and Service
(6) : Annex F General Facility Construction Services
17. ATTACHMENT:
Attachment (2):
1) Public Works Cost for Right-of-Way Maintenance
2) City of Barstow – Table of Administrative Charges
IN WITNESS WHEREOF, the parties have executed this IGSA as of this day of , in the year .
MCLB BARSTOW CITY OF BARSTOW
BY: BY:
RUSSELL W. SAVATT IV ROCHELLE CLAYTON
COMMANDING OFFICER CITY MANAGER
DATE: DATE:
ANNEX A FOR ROAD MAINTENANCE AND REPAIR TO INTERGOVENRMENTAL
SUPPORT AGREEMENT (IGSA) BETWEEN MARINE CORPS LOGISTICS BASE (MCLB)
BARSTOW
AND
THE CITY OF BARSTOW, CALIFORNIA
This is an Annex A to the Intergovernmental Support Agreement (IGSA) between the Marine Corps Logistics Base (MCLB) Barstow and the City of Barstow. This Annex A is made by and between the Commanding Officer, MCLB Barstow and the City of Barstow to establish a reimbursable relationship for road maintenance and repair services including pothole repairs, crack sealing, shoulder maintenance, traffic markings, and/or slurry seal applications to support MCLB Barstow. Total repair and upkeep are not to exceed $500,000 per year.
1.1. MCLB Barstow will:
1.1.1. Pay the City of Barstow within 30 days of receiving approved invoices for accepted services.
1.2. The City of Barstow will:
1.2.1. Execute agreed-upon work as outlined in the scope of work.
1.2.4. Supply all labor, equipment, transportation, supplies, and materials necessary to perform road maintenance services.
1.3. Both Parties will:
1.3.1. Cooperate to ensure mutual goals are met and issues are promptly resolved.
1.3.2. Notify the other party of any concerns and communicate transparently to address issues.
1.3.3. Resolve disputes amicably before initiating termination procedures.
1.3.4. Protect personal information and maintain confidentiality when requested, in compliance with applicable laws.
1.3.5. Respond to public requests for IGSA-related information under the Freedom of Information Act (FOIA).
ANNEX B FOR LAB SERVICES TO INTERGOVENRMENTAL SUPPORT AGREEMENT (IGSA) BETWEEN MARINE CORPS LOGISTICS BASE (MCLB) BARSTOW AND
THE CITY OF BARSTOW, CALIFORNIA
This is an Annex B to the Intergovernmental Support Agreement (IGSA) between the Marine Corps Logistics Base (MCLB) Barstow and the City of Barstow. This Annex B is made by and between the Commanding Officer, MCLB Barstow and the City of Barstow to establish a reimbursable relationship for drinking water and wastewater analysis services to support MCLB Barstow.
1. RESPONSIBILITIES OF THE PARTIES:
1.1.MCLB Barstow will:
1.1.1 Provide the City of Barstow with access to MCLB Barstow's relevant environmental permits to identify the general scope of services to be requested by MCLB Barstow and the applicable due dates for Orders to be placed with the City of Barstow. Services are generally required for twelve monthly sampling events, four quarterly sampling events, semi-annual, and annual sampling events; however, services requested by MCLB Barstow and required turnaround times (TATs) may vary from these permits, as deemed necessary by MCLB Barstow
1.1.2. Collect water and wastewater samples in accordance with its relevant permits and promptly store in Building 325 for pick-up by laboratory for analysis within ten (10) days of the applicable due date for permit compliance. Shorter TATs may be requested by MCLB Barstow prior to sample pick-up, and may be approved by the City of Barstow at the following rates (based on standard analytical costs):
1 DAY TAT: 200%
2 DAY TAT: 100%
3 DAY TAT: 50%
5 DAY TAT: 25%
7 DAY TAT: 10%
1.1.3. Be responsible for the proper packaging and chain of custody requirements preceding pick-up from laboratory.
1.1.4. Complete a Chain of Custody Form to accompany each required drinking water and Wastewater analysis requested from City of Barstow. The receipt of a completed Chain of Custody Form will initiate the TAT and dictate any applicable TAT rate premiums for required analysis.
1.1.5. Be responsible for incorporating laboratory results received from the city of Barstow in all quarterly, semi-annual and annual reports due to the State of California Water Resources Board on the last day of the following month, and submitting those reports.
1.2. The City of Barstow will:
1.2.4. Provide drinking water and wastewater analysis of samples provided by MCLB Barstow at a laboratory meeting the State of California certification requirements, as reflected in applicable MCLB Barstow permits.
1.2.5. Perform sampling analysis according to applicable MCLB Barstow permits and amendments, and as reflected in Chain of Custody Forms received from MCLB Barstow. In the event of conflict between the permit requirements and the Chain of Custody Form, the City of Barstow will defer to what is requested in the Chain of Custody Form.
1.2.6. Promptly begin providing the services as soon as an Order is received from MCLB Barstow and accepted. Other than requests for shorter TAT on samples, the City of Barstow will accept all Orders placed by MCLB Barstow for services covered by this IGSA.
1.2.7. Minimize delays in the provision of services and/or any sub-standard quality analysis of MCLB Barstow samples, to the extent possible. In the event delays are expected or sub-standard services are provided, the City of Barstow shall immediately remedy and handle in accordance with Quality Control and Inspection procedures.
1.2.8. Adhere to the services requested and prices reflected in a Chain of Custody Form, as written. The City of Barstow will not perform any work not contemplated or included in
the scope of services, or in excess of the dollar amount reflected in the Order, without prior written approval from the IGSA Agreement Manager or Ordering Officer on an approved IGSA Order Modification. Any work performed or cost runovers that have not received advance written approval from the IGSA Agreement Manager or Ordering Officer will be at the expense of the City of Barstow.
1.2.9. Subject to shorter TAT premiums, as applicable, provide laboratory results to MCLB Barstow in accordance with the following deadlines, unless otherwise reflected in the Chain of Custody Form:
1.2.9.1. Laboratory results for water shall be submitted to MCLB Barstow by the 5th day of the month following receipt of a Chain of Custody Form. For example, laboratory results for sample picked up by laboratory in February are due March 5th, and laboratory results for samples picked up by laboratory in March are due April 5th. If the 5th day of the month is a holiday or falls on a weekend, the City of Barstow shall provide laboratory results to MCLB Barstow within three workdays occurring after the weekend or holiday.
1.2.9.2.Laboratory results for wastewater shall be submitted to MCLB Barstow by the 15th day of the month following receipt of a Chain of Custody Form.
For example, laboratory results for samples picked up by laboratory in February is due on March 15th, and laboratory results for samples picked up by laboratory in March are due on April 15th. If the 15th day of the month is a holiday or falls on a weekend, the City of Barstow shall provide laboratory results to MCLB Barstow within three workdays occurring after the weekend or holiday.
1.2.9.3.Sampling dates shall be coordinated with the Chief Plant Operator to make sure results are provided as required.
1.2.10. Anticipate, and be prepared to provide analytical services for, the following parameters at a minimum:
Monthly: phenols, Total Dissolved Solids (TDS), Total Suspended Solids (TSS), Biological Oxygen Demand (BOD), oil and grease, Chemical Oxygen Demand (COD), and Methylene Blue Active Substances (MBAS).
Quarterly: ammonia, Total Kjeldahl Nitrogen (TKN), nitrate, volatile organic compounds (VOC), oil and grease, COD, phenols, TDS, BOD, and MBAS.
Semi-Annually: chloride, fluoride, sulfate, chromium 6, total chromium, hardness, calcium, magnesium, sodium and boron, ammonia, TKN, nitrate, voe, oil and grease, COD, phenols, TDS, BOD, and MBAS.
Annually: Semi Volatile Organic Component, antimony, arsenic, barium, beryllium, cadmium, cobalt, copper, lead, molybdenum, nickel, selenium, silver, thallium, vanadium, and mercury, chloride, fluoride, sulfate, chromium 6, total chromium, hardness, calcium, magnesium, sodium, boron, ammonia, TKN, nitrate, voe, oil and grease, COD, phenols, TDS, BOD, and MBAS.
MCLB Barstow may add or reduce the parameters and sampling frequency as necessary according to permit requirements.
1.2.11. Expect one resampling effort per quarter for a total of four resampling events at the discretion of MCLB Barstow.
1.2.12. As the current lab contract comes to an end, the City will begin the new term for the award of a competitive contract. Once complete the City of Barstow and MCLB Barstow will be required to modify this agreement with the new cost adjustments.
1.3. Both parties will:
1.3.4. Cooperate to ensure mutual goals are met and issues are promptly resolved.
1.3.5. Promptly notify the other party of any concerns and communicate openly and transparently to ensure any concerns or issues are promptly dealt with in order to not impede performance under this IGSA.
1.3.6. Resolve to try to work out disputes to the extent feasible before initiating termination procedures.
1.3.7. To the extent permitted by the laws governing each party, the parties shall protect personal information and also shall maintain the confidentiality of other exchanged information when requested to do so by the providing party.
1.3.8. Comply with public requests for information related to this IGSA pursuant to the Freedom of Information Act, 5 U.S.C. §552.
ANNEX C FOR LIQUEFIED PETROLEUM (LPG) GAS SERVICES TO
INTERGOVENRMENTAL SUPPORT AGREEMENT (IGSA) BETWEEN MARINE CORPS
LOGISTICS BASE (MCLB) BARSTOW
AND
THE CITY OF BARSTOW, CALIFORNIA
This is an Annex C to the Intergovernmental Support Agreement (IGSA) between the Marine Corps Logistics Base (MCLB) Barstow and the City of Barstow. This Annex C is made by and between the Commanding Officer, MCLB Barstow and the City of Barstow to establish a reimbursable relationship for purchase of Liquefied Petroleum Gas (LPG) to support MCLB Barstow.
1. RESPONSIBILITIES OF THE PARTIES:
1.1. MCLB Barstow will:
1.1.1. Provide a detailed scope of services to be obtained and the period of performance required.
1.1.2. Obligate full funding required to furnish the services described in the scope of services.
1.1.3. Negotiate with the City of Barstow to ensure a fair and reasonable price for the services ordered and obtained. Validate the final negotiated amount required to furnish the scope of services applicable price and employ cost analysis techniques as determined necessary to protect the interests of the Marine Corps and the United States.
1.1.4. Pay the City of Barstow within 30 days of receipt of periodic invoices for services rendered and accepted by MCLB Barstow.
1.2. The City of Barstow will:
1.2.1. Provide a full LPG service for a not-to-exceed (NTE) 100,000 gallons a year.
1.2.2. Provide a firm-fixed price supply requirement contract with an economic price adjustment to supply and deliver LPG, which includes rental of tanks and associated equipment.
1.2.3. Furnish all labor, equipment, transportation, supplies, and materials necessary to deliver bulk liquid propane into contractor furnished and MCLB Barstow furnished property storage tanks at various locations as called for under this contract.
1.2.4. Meet Industry Standard 2.1 UN 1075, Non-corrosive and Odorized. It is the responsibility of the contractor to ensure the industry standards are met.
1.2.5. Deliver to the Marine Corps Logistics Base, Barstow, CA at various locations.
1.2.6. Provide the quantity of LPG required, but will vary depending upon the average temperatures, with more LPG usage during colder winters.
1.2.7. Not be obligated to continue the delivery of bulk propane under the contract, or otherwise deliver quantities, in excess of the NTE quantity of 100,000 gallons per year, unless the City of Barstow with MCLB Barstow Public Works Department approval (i) notifies the contractor, in writing, that the NTE quantities have been increased and (ii) provide a revised NTE total quantity for the line item(s) under the contract/delivery order.
1.2.8. Provide contractor furnished property and shall be provided at no charge to MCLB Barstow, except as may be expressly provided here under. Such contractor furnished property shall be delivered to MCLB Barstow at the locations designated. MCLB Barstow reserves the right to re-designate locations at which the contractors furnish property is to be located.
1.2.9. In the event that any contractor furnished property tanks are removed and replaced by the contractor, the contractor shall ensure that MCLB Barstow is provided an amount of LPG in the replacement tanks equivalent to the amount of LPG in the removed tank at no cost to MCLB Barstow.
1.2.10. Provide all costs to maintain contractor furnished property and correct tank discrepancies shall be borne by the contractor, including the inspection of contractor owned tanks during refueling.
1.2.11. Be responsible for maintenance, inspection, and/or repair of all contractors furnished property utilized during the performance of this contract.
1.2.12. Be responsible for training MCLB Barstow base employees on the proper use of equipment.
1.2.13. Conduct inspections of contractor owned tanks in accordance with industry standards.
1.2.14. Establish a means in which to account for the property. A copy shall be provided to the MCLB Barstow five (5) days prior to the date of the first delivery. When additional tanks are installed, the contractor shall advise MCLB Barstow in writing as to the serial numbers, locations, and size of all tanks within five (5) days after their installation and upon any changing of tanks thereafter.
1.2.15. Provide additional contractor furnished tanks to be installed or the removal of already installed if such tanks are no longer required. The City of Barstow shall notify the contractor fifteen (15) days prior to requested additions or reductions. Should it become necessary for the contractor to remove its tanks, MCLB Barstow shall be reimbursed for the unused propane remaining in the tanks being removed.
1.2.16. Be responsible for all costs of delivery and installation of new tanks, including but not limited to, off-loading the tanks, setting, mounting, and stabilizing of tanks and all necessary connections.
1.2.17. Not fill tank to full capacity during summer months 1 June through 30 September. In the event this does happen and MCLB Barstow has to dispatch Emergency Service personnel to cool the tank, the contractor will absorb all costs associated with Emergency Services. The City of Barstow will not be responsible for any costs or damages associated with the incident or Emergency Services.
1.2.18. Conduct annual safety training for all personnel that will be using LPG for Forklift refueling operations.
1.2.19. Obtain service contact on a competitive basis.
1.3. Both parties will:
1.3.1. Cooperate to ensure mutual goals are met and issues are promptly resolved.
1.3.2. Promptly notify the other party of any concerns and communicate openly and transparently to ensure any concerns or issues are promptly dealt with in order to not impede performance under this IGSA.
1.3.3. Resolve to try to work out disputes to the extent feasible before initiating termination procedures.
1.3.4. To the extent permitted by the laws governing each party, the parties shall protect personal information and shall maintain the confidentiality of other exchanged information when requested to do so by the providing party.
1.3.5. Comply with public requests for information related to this IGSA pursuant to the Freedom of Information Act, 5 U.S.C. §552.
ANNEX D FOR UNIFORM RENTAL SERVICE TO INTERGOVENRMENTAL SUPPORT
AGREEMENT (IGSA) BETWEEN MARINE CORPS LOGISTICS BASE (MCLB)
BARSTOW
AND
THE CITY OF BARSTOW, CALIFORNIA
This is Annex D to the Intergovernmental Support Agreement (IGSA) between the Marine Corps Logistics Base (MCLB) Barstow and the City of Barstow. This Annex D is made by and between the Commanding Officer, MCLB Barstow and the City of Barstow to establish a reimbursable relationship with uniform rental services to support MCLB Barstow.
1. RESPONSIBILITIES OF THE PARTIES:
1.1. The MCLB Barstow will:
1.1.1. Provide a detailed scope of services to be obtained and the period of performance required.
1.1.2. Obligate full funding required to furnish the services described in the scope of services.
1.1.3. Negotiate with the City of Barstow to ensure a fair and reasonable price for the services ordered is obtained. Validate the final negotiated amount required to furnish the scope of services applicable price and cost analysis techniques as determined necessary to protect the interests of the Marine Corps and the United States.
1.1.4. Pay the City of Barstow within 30 days of receipt of periodic invoices for services rendered and accepted by MCLB Barstow.
1.2. The City of Barstow will:
1.2.1. Provide a full uniform rental service for an estimated 60 employees that includes:
1.2.2. 45 employee uniforms consisting of 11 Flame Resistant (FR) rating ATPV
8.6 or above rated shirts (long sleeves) and 11 FR rating 20.7 or above 100% cotton blue jeans/kakis each. Provide 12 Flame Resistant FR 80 Cal arch flash suit, hood, and balaclava.
1.2.3. 15 employee uniforms consisting of 11 non-FR shirts (short or long sleeves) and 11 nonFR pants each.
1.2.4. Provide each employee with one perm-lined FR/NONFR panel jacket.
1.2.5. Add name tags to all non-Arc Flash shirts.
1.2.6. The quantities are estimates for acquainting the service provider with probable quantities to be expected during the agreement period. The proposed quantities may be subject to additions or deletions.
1.2.7. Measure each employee for specific size and issues.
1.2.8. Make weekly deliveries to pick up soiled uniforms and drop off clean uniforms.
1.2.9. If employee gains or loses weight, employee will be re-measured for proper size with an additional cost to the government of $5.00.
1.2.10. If uniform becomes damaged due to non-normal wear and tear the service provider will replace with an additional cost to the government of $5.00.
1.2.11. If employee leaves and is replaced by a new employee, service provider will then measure and provide new uniform to new employee with an additional cost to the government of $0.50 per garment.
1.2.12. All normal wear and tears will be the service provider’s responsibility to replace without additional cost to the government.
1.2.13. Each location will have a laundry bank to put in soiled uniforms for service.
1.2.14. The service provider will always maintain inventory control for each employee so that uniforms have been assigned.
1.2.15. Service provider will deliver the estimated 60 uniforms to three different locations. The uniforms will be delivered to Nebo Annex Building 196, Yermo Annex Building 573, and Yermo Annex Building 608.
1.2.16. Obtain service contact on a competitive basis.
1.3. Both parties will:
1.3.1. Cooperate to ensure mutual goals are met and issues are promptly resolved.
1.3.2. Promptly notify the other party of any concerns and communicate openly and transparently to ensure any concerns or issues are promptly dealt with in order to not impede performance under this IGSA.
1.3.3. Resolve to try to work out disputes to the extent feasible before initiating termination procedures.
1.3.4. To the extent permitted by the laws governing each party, the parties shall protect personal information and shall maintain the confidentiality of other exchanged information when requested to do so by the providing party.
1.3.5. Comply with public requests for information related to this IGSA pursuant to the Freedom of Information Act, 5 U.S.C. §552.
ANNEX E FOR MATERIALS AND SERVICES TO INTERGOVERNMENTAL SUPPORT
AGREEMENT (IGSA) BETWEEN MARINE CORPS LOGISTICS BASE (MCLB)
BARSTOW
AND
THE CITY OF BARSTOW, CALIFORNIA
This is an Annex E to the Intergovernmental Support Agreement (IGSA) between the Marine Corps Logistics Base (MCLB) Barstow and the City of Barstow. This Annex E is made by and between the Commanding Officer, MCLB Barstow and the City of Barstow to establish a reimbursable relationship for purchase of Materials and Services (M&S) support MCLB Barstow. Total purchase costs are not to exceed $250,000 per quarter.
1. RESPONSIBILITIES OF THE PARTIES:
1.1. MCLB Barstow will:
1.1.1. Provide a detailed scope of work or itemized quote for M&S to be procured for facility maintenance repair.
1.1.2. Obligate full funding to furnish the required M&S and agreed upon fee from City of Barstow.
1.1.3. Pay the City of Barstow within 30 days of receiving approved invoices for accepted services.
1.2. The City of Barstow will:
1.2.1. Execute agreed-upon work as outlined in the scope of work.
1.2.2. Provide M&S to MCLB Barstow.
1.2.3. Furnish a firm-fixed price contract with an economic price adjustment for materials and services.
1.2.4. Supply all labor, equipment, transportation, supplies, and materials necessary to deliver the requested M&S.
1.2.5. Procure services on a competitive basis ensuring quality and cost-effectiveness.
1.3. Both Parties will:
1.3.1. Cooperate to ensure mutual goals are met and issues are promptly resolved.
1.3.2. Notify the other party of any concerns and communicate transparently to address issues.
1.3.3. Resolve disputes amicably before initiating termination procedures.
1.3.4. Protect personal information and maintain confidentiality when requested, in compliance with applicable laws.
1.3.5. Respond to public requests for IGSA-related information under the Freedom of Information Act (FOIA).
ANNEX F FOR GENERAL FACILITY CONSTRUCTION SERVICES TO
INTERGOVENRMENTAL SUPPORT AGREEMENT (IGSA) BETWEEN MARINE CORPS
LOGISTICS BASE (MCLB) BARSTOW
AND
THE CITY OF BARSTOW, CALIFORNIA
The purpose of this Annex is to authorize the Marine Corps Logistics Base (MCLB) Barstow Commanding Officer, in consultation with the City Manager for the City of Barstow, to authorize the City of Barstow to perform public works projects and provide General Facility Construction Services at MCLB Barstow.
The parties execute this Annex in order to provide services, supplies, or construction to the United States, to achieve cost savings for the Department of the Marine Corps, and to provide additional revenues to local governments and their work forces.
RESPONSIBILITIES OF THE PARTIES:
MCLB Barstow will provide a formal Request for Proposal to (RFP) to City of Barstow to acquire the stated service. The RFP will state the detailed requirement of the service in forms of statement of work, technical reference, and period of performance, and which might also include but not limited to drawing and schematics. City of Barstow will review the RFP package and provide formal requests for information (RFI) to clarify any specific requirements that relate to the RFP. City of Barstow will provide a cost proposal corresponding to the RFP and RFIs. Once MCLB Barstow deems the proposal awardable, MCLB Barstow will issue an Approved Purchase Request from the accounting system to serve as a Purchase order for City of Barstow to proceed with the service. MCLB Barstow is only obligated to the dollar amount that is stated on the Purchase order if the provided service meets and exceeds the requirements that are stated on the RFP and RFIs.
The City of Barstow shall perform public works projects of up to one million dollars ($1,000,000) in value per project at MCLB Barstow with the written approval of the Commanding Officer and the City Manager. Public works projects worth greater than one million dollars require the additional approval of the Barstow City Council. The value of the public works projects to be performed by the City of Barstow shall be measured by the amount budgeted for the project by the United States.
This is a non-personal services agreement. Each party is responsible for all costs of its personnel including pay, benefits, support, and travel. Each party is responsible for supervision or management of its personnel.
The tasks, duties and responsibilities set forth in this Annex F may not be interpreted or implemented in any manner that results in City of Barstow personnel creating or modifying federal policy, obligating appropriated funds of the United States, or overseeing the work of federal employees.
Under no circumstances shall City of Barstow employees or contractors be deemed federal employees. If the City of Barstow shall provide services through a contract, the contract must be awarded through competitive procedures. (This requirement does not apply to collective bargaining agreements between the City of Barstow and its employees.) Employees of the United States may not perform services for or on behalf of the City of Barstow without the approval of the IGSA Manager.
TERM OF AGREEMENT:
The term of this Agreement shall be for one year from the execution of the Agreement by the IGSA Manager, and renewable for successive one-year periods for 9 additional years. The United States shall only be obligated for only one year of performance under the agreement, as it has no authority to obligate additional periods of performance without appropriation of adequate funds by the Congress. The United States shall only be obligated for an additional year of performance upon receipt of such funds, and only upon written notice by the IGSA Manager of an intent to award the option for an additional year of performance. The IGSA Manager shall provide notice of the renewal of the IGSA at least 30 days prior to the expiration of the current performance period. The IGSA Manager may condition the renewal upon availability of funds and may suspend performance of the renewed period at no additional cost to the United States, until adequate funds have been received. If funds are not received, the parties agree that the Agreement can be unilaterally terminated by the IGSA Manager without further liability to the United States.
TERMINATION:
This Annex F may be terminated by mutual written agreement at any time. Except as otherwise specified in this agreement, either party can unilaterally terminate this Annex F upon 30 days written notice to the POCs designated in this Agreement.
The United States reserves the right to terminate this agreement for its convenience at any time.
When notified by the IGSA Manager of the termination, the City of Barstow shall immediately stop all work. The government will pay the City of Barstow a percentage of the agreed price reflecting the percentage of work performed to the notice and associated reasonable termination costs. The City of Barstow shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
PAYMENT:
Work performed by the City of Barstow under this Annex F shall accord with the same payment process as detailed in the IGSA, except that all invoices properly submitted by the City shall be paid by the United States within 30 days.
OPEN COMMUNICATIONS AND QUALITY CONTROL:
The Parties shall identify and present any issues and concerns that could potentially impede successful performance of the Annex in a timely and professional manner. The City of Barstow shall maintain a quality control plan to ensure all work is completed within the specified timelines and quality standards specified in the Annex.
INSPECTION OF SERVICES: The City of Barstow will only offer tender services and goods in conformance with the IGSA and Annex. The installation shall appoint a Technical Representative (“TR”) who will be responsible for inspecting all services performed. The City of Barstow will be notified of the identity of the TR and their alternate, of any changes. If services are performed outside the installation, the TR shall be granted access to areas where services are performed.
The TR shall have the right to inspect and test all services; inspections and tests to be conducted in a manner that will not unduly delay the performance of work.
If the TR determines that services do not conform to the requirements in Agreement and the Annex, the TR can require the City of Barstow to perform the services again, in whole or in part, at no additional cost to the government. Alternatively, the TR can reduce the price to be paid for services to reflect the reduced value of the services to be performed. If the services cannot be corrected by re-performance, the TR can reduce the billed price to reflect the reduced value of the services to be performed. The TR may alternately, in his sole discretion, waive price reductions or re-performance of services. Such waivers shall not constitute a waiver of requirements in the IGSA unless approved in writing by the IGSA Manager.
If the City of Barstow is unable to perform any of the services due to an occurrence beyond the reasonable control of the parties, such as Acts of God, unusually severe weather, or government activities on the installation which impede the City of Barstow’s performance, the City of Barstow shall promptly notify the TR.
In those rare instances in which the City of Barstow fails to re-perform services or abandons performance, the United States may perform or contract for performance of the services and charge those costs to the City of Barstow. Except in an emergency, the United States will not exercise this authority without providing prior notice to the POC designated by the City of Barstow to allow for amicable resolution of issues between the parties. If services are deemed to be deficient and cannot be corrected to the satisfaction of the TR, the Agreements Officer may terminate the IGSA immediately. Such termination shall not become effective without prior notice and consultation with the City of Barstow POC identified in this agreement.
SUSPENSION OF ANNEX:
The United States reserves the right to suspend performance of the agreement or access to the installation in event of emergencies, mobilizations, national security reasons, or for other reasons outside the control of the United States. The City of Barstow will be entitled to an extension of time to for completion of the Services and shall be extended based upon the impact of the delay or suspension and shall receive an equitable compensation adjustment. In the event either party is unable to perform its obligations under the terms of this Agreement because of acts of God, strikes, equipment or transmission failure or damage reasonably beyond its control, or other causes reasonably beyond its control, such party shall not be liable for damages to the other for any damages resulting from such failure to perform or otherwise from such causes.
APPLICABLE LAW:
The Annex is subject to the law and regulations of the United States. If any federal statue expressly prescribes policies or requirements that differ from the terms and conditions of this Annex, the provisions of the statute shall govern.
CLAIMS AND DISPUTES:
The parties shall adhere to the same claim and dispute process as outlined in the IGSA.
AMENDMENTS TO THE IGSA:
Any party can propose amendments at any time. All amendments must be reduced to writing, agreed upon by the parties, and incorporated by amendment to Agreement by the IGSA Manager in order to be effective.
DUTY TO PROTECT GOVERNMENT PROPERTY ON THE INSTALLATION:
The requirement of the City of Barstow to conduct a site visit of the installation with the Technical Representative and prepare an accident-avoidance plan for the IGSA shall also cover the annex and no additional site visit or accident-avoidance plan is required to be carried out by the Public Partner for the Annex.
The City of Barstow shall take measures to protect and not damage any property of the United States during performance of services. Should the City of Barstow damage such property, the City of Barstow may replace the item or restore it to its prior condition at its own cost or reimburse the United States for such costs. If the City of Barstow does not take measures to replace or restore, the United States reserves the right to deduct replacement or restoration costs from amounts billed by the City of Barstow each month. The CR shall provide written notice of the Government's intent to offset costs against billings to allow the parties to resolve the matter amicably. Such resolution can include a schedule for payments to cover the loss or restoration of Government property over the term of the current period of performance.
CONTINUITY OF SERVICES:
The City of Barstow recognizes that the services under this Agreement are vital to the United States and must be continued without interruption and performed even in event of a dispute between the parties. Should the United States terminate this Agreement for any reason, the City of Barstow agrees to furnish phase-in training to any successor contractor and exercise its best efforts and cooperation to affect an orderly and efficient transition of services.
HOLD HARMLESS:
Except as otherwise provided in this annex, the City of Barstow shall indemnify and hold the United States harmless against any and all judgments, expenses, liabilities, claims and charges of whatever kind or nature that may arise as a result to the extent of the City of Barstow negligence, willful acts or misconduct of the activities of the City of Barstow or its employees and subcontractors in performance of this Agreement.
INSURANCE: The insurance provided by the City of Barstow to the United States under the IGSA shall also cover all work performed under this Annex.
WAGES AND LABOR LAW PROVISIONS:
The City of Barstow shall adhere to the same Wage and Labor Provisions as outlined in the IGSA.
NON-DISCRIMINATION AND SEXUAL ASSAULT/HARASSMENT:
The Public Partner and its contractors shall adhere to the same Non-Discrimination and Sexual Assault/Harassment provisions as outlined in the IGSA.
TRANSFERABILITY: This Annex is not transferable except with the written authorization of the IGSA Manager.
ACTIONS OF DESIGNEES: Any act described in the Annex to be performed by an individual or official can be performed of the designee of such individual or official, with the exception of the Agreements Officer.
Description Regular Rate OT Rate Basis Per Hour Total#
Striping - 6 Person Crew $67.32 $100.98 Time-Based $403.93 Description Regular Rate OT Rate Basis Per Hour Total#
Travel Time $67.32 $100.98 Time-Based $403.93
Description Regular Rate OT Rate Basis Per Hour Total#
Project Administration - Street Dept. $71.57 $107.35 Time-Based $71.57 Project Administration - Finance Dept. $53.83 $80.74 Time-Based $53.83 Description Hourly Rate Basis Per Hour Total#
Striping Truck $57.58 Time-Based $57.58
Fuel - Striping Truck $5.76 Time-Based $5.76
Description Basis Material Total
Striping - Materials Actual Cost + 15% Actual Cost + 15% #
Per Hour Total is calculated at regular rate. Hourly OT rate is calculated by multiplying Regular Rate by 1.5.
Description Regular Rate OT Rate Basis Per Hour Total#
Crack Sealing - 5 Person Crew $67.32 $100.98 Time-Based $336.61 Description Regular Rate OT Rate Basis Per Hour Total#
Travel Time $67.32 $100.98 Time-Based $336.61
Description Regular Rate OT Rate Basis Per Hour Total#
Project Administration - Street Dept. $71.57 $107.35 Time-Based $71.57 Project Administration - Finance Dept. $53.83 $80.74 Time-Based $53.83 Description Rate Basis Per Hour Total#
Fleet Truck $55.55 Time-Based $55.55
Fuel - Fleet Truck $5.55 Time-Based $5.55
Crack Sealer $71.42 Time-Based $71.42
Fuel - Crack Sealer $7.14 Time-Based $7.14
Description Basis Material Total
Crack Sealing - Materials Actual Cost + 15% Actual Cost + 15% #
Per Hour Total is calculated at regular rate. Hourly OT rate is calculated by multiplying Regular Rate by 1.5.
Description Regular Rate OT Rate Basis Per Hour Total#
Pothole Repair - 2 Person Crew $67.32 $100.98 Time-Based $134.64 Description Regular Rate OT Rate Basis Per Hour Total#
Travel Time $67.32 $100.98 Time-Based $134.64
Description # of Employees Regular Rate OT Rate Basis Per Hour Total# Project Administration - Street Dept. 1 $71.57 $107.35 Time-Based $71.57 Project Administration - Finance Dept. 1 $53.83 $80.74 Time-Based $53.83 Description Rate Basis Per Hour Total
Fleet Truck $55.55 Time-Based $55.55
Fuel - Fleet Truck $5.55 Time-Based $5.55
Description Basis Material Total
Pothole Repair - Materials Actual Cost + 15% Actual Cost + 15% #
Per Hour Total is calculated at regular rate. Hourly OT rate is calculated by multiplying Regular Rate by 1.5.
Public Works Cost For Right-of Way Maintenance
Striping Streets - Personnel
Crack Sealing* - Personnel
*Based on medium range cracking from 1/4" to 1-1/2". Cracks larger than 1 1/2" require Mastic Sealing Material. Traffic control included in cost.
Striping Streets - Equipment
# of Employees
5 Quantity
10% of Hourly Equipment Cost
Each
Project Administration - Personnel
Project Administration - Personnel
Striping Streets - Travel Time
Pothole Repair - Equipment
Each
10% of Hourly Equipment Cost
Quantity
# of Employees
2 Project Administration - Personnel
Pothole Repair - Personnel
Crack Sealing* - Equipment
Each
10% of Hourly Equipment Cost
Each
10% of Hourly Equipment Cost
Quantity
As Required By Project
Crack Sealing* - Travel Time
# of Employees
1 1
5 # of Employees
# of Employees
# of Employees
6 # of Employees
6 As Required By Project
STRIPING STREETS
CRACK SEALING*
POTHOLE REPAIR
Pothole Repair - Travel Time
# of Employees
2 Pothole Repair - Materials
Quantity
Striping Streets - Materials
Quantity
As Required By Project
Crack Sealing* - Materials
Quantity
1 1
Attachment 1
Amount
(Rounded Up Nearest Dollar) Administrative Fee
$0-$49,999 10%
$50,000-$99,999 9%
$100,000-$249,999 8%
$250,000-$499,999 7%
$500,000-$999,999 6%
$1,000,000-$1,999,999 5%
$2,000,000-$2,999,999 4%
Over $3,000,000 3%