Cities Index.
Agenda packet, regular meeting

Beaumont City Council
May 16, 2023

Document
Agenda packet, regular meeting
Meeting
May 16, 2023
Body
Beaumont City Council
Pages
57,171
Original file
2.9 MB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

DINA EL CHAMMAS GASS
Senior Engineer
[email protected]
• Solana Vista Elementary School Reconstruction Pipeline Risk Assessment | Solana Beach CA
• Brownwell Middle School Project Pipeline Risk Assessment | Gilroy CA CEQA
• 4416 Azusa Canyon Road Project IS/MND | Irwindale CA
• Whitmore Villa Residential Development IS/MND | Monterey Park CA • San Bernardino Countywide Plan EIR | San Bernardino County CA • Agua Mansa Commerce Park Specific Plan EIR | Jurupa Valley CA • Etiwanda Avenue/Country Village Road Truck Restriction Ordinance EIR | Jurupa Valley CA
• Proposed Rule 2305; Warehouse Indirect Source Rule Environmental Assessment | South Coast Air Basin CA
• New City Center Mixed-Use Project EIR | Laguna Niguel CA • Newport Crossings Mixed Use Project EIR | Newport Beach CA

PRIOR EXPERIENCE
• Crowe Creek State Revolving Fund Project | Fairfield IA • Baku Tbilisi Cheyhan Pipeline | Republic of Georgia
• Crescent New Gas Processing Plant | United Arab Emirates • Mitigation of NGL Plants Flares and RAG Utilization Project | Qatar • Dorood Project Onshore Facilities | Iran
• Expansion and Development of the Harweel Miscible Gas Injection Enhanced Oil Recovery Project| Oman
• Kashagan Field Development Project | Kazakhstan

PUBLICATIONS
• “Immerse in Your Watershed: Problem Based, Service Learning for Undergraduate Sustainability Education,” The Journal of Sustainability Education, January 2017.
• “Potentiality of Wastewater Reclamation and Reuse in the Lebanon: A Case Study,” Master’s Thesis, American University of Beirut, Beirut, Lebanon, 2003.

AWARDS
• 2002 Abd El Aal Research Award for the Advancement of Water Resource Engineering Research

Page 957 of 1311 ends

MICHAEL J. WATSON PG
Senior Geologist
With two decades in the environmental consulting industry, Mike is proficient in performing site assessments and remediation. He specializes in site assessments, geohazard studies, operations and maintenance programs, air quality and industrial hygiene assessments, groundwater investigations, and remedial actions. Mike also manages materials acquisition, field equipment maintenance, and subcontractor coordination on large field investigations and monitoring programs.

A dedicated geologist, Mike continually strives to refine his knowledge, methods, and efficacy. He is especially committed to his current work for numerous school districts throughout California, where he assists in site assessment services and the Department of Toxic Substances Control’s school site approval process. He performs Phase I ESAs, PEAs, geohazard studies, supplemental site investigations, remedial investigation reports, removal action documents, feasibility study reports, Title 5 Constraints Studies, and fill testing reports. In addition, he assists with the management and implementation of field investigations, assembles project data, and arranges methodical and comprehensive procedures to attain the client’s goals.

HIGHLIGHTS OF EXPERIENCE
Site Assessments
• PEA and Geological and Environmental Hazards Assessment (GEHA) for Proposed STEM High School, Natomas USA | Natomas CA
• PEA-Equivalent and GEHA for Mare Island Technology Academy Renovations, Griffin Technology Academies | Vallejo CA
• Supplemental Site Investigation for David Starr Jordan High School | Los Angeles USD
• PEAs, Phase I ESAs, and GEHAs for various schools | Riverside USD • Phase I ESAs, Addendums and GEHAs for various sites | Paradise USD • PEA, Housekeeping Services, and GEHA for Rise Kohyang High School, Bright Star Schools | Los Angeles CA
• PEA and Remedial Action for New High School at 201 North Douglas Street, Wiseburn USD | El Segundo CA
• PEA, SSI and Removal Action for Dillard Elementary School Reconstruction | Elk Grove USD
• Phase I ESAs for multiple properties | Rancho Cordova CA • PEAs, Phase I ESAs, Geohazards Study Reports, and Title 5 Studies for various schools | Moreno Valley USD
• PEAs and Fill Testing for various schools | Clovis USD • PEA for Proposed Castaic High School, William S. Hart Union High School District | Castaic CA

EDUCATION
• BS, Geology, University of
California, Riverside

REGISTRATIONS
• California Professional Geologist
No. 8177

CERTIFICATIONS
• 40-Hour Hazardous Waste Workers
(HAZWOPER) Certification
• 24-Hour First Responders
Certification
• 8-Hour HAZWOPER Refresher
Certification
• CPR/First Aid Certification
• NITON X-ray Fluorescence (XRF)
Analyzer Certification

AFFILIATIONS
• Geological Society of America
• Association of Environmental and
Engineering Geologists
• Seismological Society of America
• Inland Geological Society
• South Coast Geological Society
Team member since 2005

Page 958 of 1311 ends

MICHAEL J. WATSON
Senior Geologist
[email protected]
• Phase I ESA for Proposed K–8 Parker Dam School | Needles USD • Removal Action, Fill Testing and Quarterly Groundwater Sampling for Central Region High School No. 13 | Los Angeles USD
• Removal Actions for Chaffey West Community Day School and Chino Early Education Center | San Bernardino County Superintendent of Schools • Phase I ESA for the Arrowhead Springs Resort | San Bernardino CA • Phase I/II ESAs for Former Gas Station | Los Angeles CA • Quarterly Groundwater Sampling, Remedial Investigation and Remedial Action for Santa Fe Springs Athletic Fields, Little Lake City School District | Santa Fe Springs CA
• Environmental Services for various schools | Hayward USD Regulatory Compliance and Strategic Planning
• Operations & Maintenance for Rise Da Vinci High School, Da Vinci Schools | Los Angeles CA
• Operations & Maintenance for New Murray Middle School, Sierra Sands USD | Ridgecrest CA
• Environmental Auditing for General Motors Railroad Locomotive Service Facility | Commerce CA
• Construction Site Review Implementation, RAW, and Methane Mitigation System Inspection for Hull Middle School | Torrance USD • Underground Storage Tank Closure Report and Construction Response:

Removal of Six Hydraulic Lifts for Central Region Elementary School No. 13 | Los Angeles USD
• Removal Action, Oil Well Re-abandonment, Crude Oil Pipeline Removal, Construction Response Services, and Construction Site Review Implementation for Harry Bridges Span K–8 | Los Angeles USD CEQA and Title 5/CDE Assessments
• UC Berkeley Long Range Development Plan | Berkeley CA • Community College Site Analysis for 1155 W. Foothill Boulevard, Citrus Community College | Glendora CA
• Wildomar Crossroads Mixed Use IS/MND | Wildomar CA
• Norwalk Entertainment District: Civic Center Specific Plan EIR | Norwalk CA • GEHA for New K-8 School for Arboretum SP Area | Fontana USD • Title 5 studies for various schools in Westminster and Huntington Beach | Westminster School District
• City of Los Banos General Plan EIR | Los Banos CA
• City of Santa Ana General Plan EIR | Santa Ana CA

PUBLICATIONS
• M. J. Watson and S. Jorgensen, Geologic Map of the Margarita Peak 7.5 Minute Quadrangle, San Diego County, California: A Digital Database, version 1.0, mapping by S. S. Tan, California Division of Mines and Geology, Preliminary Geologic Map, 2001.
• M. J. Watson et al., Quaternary Geologic Materials Map of Part of the Juniper Hills 7.5 Minute Quadrangle, California, in Seismic Hazard Zone Report for the Juniper Hills 7.5-Minute Quadrangle, Los Angeles County, California, mapping by A. G. Barrows, D. J. Beeby, D. B. Burke, T. W. Dibblee Jr., J. E. Kahle, and D. J.

Ponti, California Geological Survey Seismic Hazard Zone Report 102, 2003. • M. J. Watson, K. R. Bovard, R. M. Alvarez, and C. I. Gutierrez, Geologic Map of the Oceanside 30’ X 60’ Quadrangle, California, mapping by M. P. Kennedy and S. S. Tan, California Geological Survey Regional Geologic Map Series, Map No. 2: Scale 1:100,000, 2007.

Page 959 of 1311 ends

KIM HERKEWITZ
GIS Manager
As GIS Manager, Kim participates in nearly every PlaceWorks project.

She has significant experience combining and analyzing information from a variety of perspectives, and she is adept at mapping and analyzing that data for planning projects and online applications.

Kim’s design work is deceptively simple and always unique, distinguished by the accuracy of her eye and her rigorous aesthetic logic. Her meticulous attention to detail and balance are particularly evident in her mapping and online applications. She has worked on site and grading plans, illustrative and land use plans, 3D visualization and modeling, web design, and various types of presentations. She is proficient with the entire ArcGIS suite of programs as well as ArcGIS Online, SketchUp, Google Earth, Photoshop, InDesign, and Illustrator. She is experienced with Python programming and Javascript/HTML5.

HIGHLIGHTS OF EXPERIENCE
GIS/Urban Planning
• San Bernardino Web-Based Countywide Plan and Program EIR | San Bernardino County CA
• Anaheim First Community Assessment | Anaheim CA
• City of Moorpark General Plan Update and EIR | Moorpark CA • Palm Springs 2019 Limited General Plan Update and EIR | Palm Springs CA • Santa Ana 2019 General Plan Update | Santa Ana CA
• Long Beach SEADIP Specific Plan, LCP Amendment | Long Beach CA • City of San Clemente General Plan Update | San Clemente CA • City of Fountain Valley 2040 General Plan Update and EIR | Fountain Valley • City of Ontario 2019-20 General Plan Update and EIR | Ontario CA • County of San Bernardino Strategic Visioning | San Bernardino County CA • New Jersey Highlands Council Fiscal Impact Assessment | Chester NJ • San Bernardino County Visioning, Phase 3 | San Bernardino County CA • Renaissance Rialto Specific Plan | Rialto CA
• North Fontana Specific Plan | Fontana CA
• Temple City General Plan Update and EIR | Temple City CA • Yucaipa 2035 General Plan Update and PEIR | Yucaipa CA • Newhall Ranch Open Space and Land Use Analysis | Valencia CA • City of Redondo Beach Focused General Plan Update | Redondo Beach CA • City of Menifee General Plan and EIR | Menifee CA
• La Habra General Plan Update | La Habra CA
• Bloomington Community Plan Update |San Bernardino CA
• Sierra Madre General Plan Update and EIR | Sierra Madre CA • Westminster General Plan Update and EIR | Westminster CA • Town of Yucca Valley General Plan Update | Yucca Valley CA • Los Alamitos General Plan and EIR | Los Alamitos CA

EDUCATION
• BS, Geography, California State
University, Long Beach
Team member since 2006

Page 960 of 1311 ends

KIM HERKEWITZ
GIS Manager
[email protected]
• City of San Bernardino General Plan Update and EIR | San Bernardino CA • County of San Bernardino Underutilized Land Analysis | San Bernardino County CA
• City of Industry General Plan Update | City of Industry CA • City of Irvine Climate Action Plan | Irvine CA
• City of Irvine Climate Action Plan Phase 2| Irvine CA • Anthem Master Plan | United Arab Emirates
• La Mesa Downtown Village Specific Plan | La Mesa CA
• Rialto Airport Land Use Study | Rialto CA
• Mammoth Crossings Planning Study & Specific Plan | Mammoth Lakes CA • Palm Springs General Plan Update and Downtown Urban Design Program | Palm Springs CA
• Shafter-Lerdo Specific Plan | Bakersfield CA
• Winchester Crossroads Specific Plan | Riverside County CA • Greenspot Village and Marketplace Specific Plan EIR | Highland CA • Hemet Stock Farm Specific Plan | Hemet CA
• Thomas Winery Retail Center Redevelopment | Rancho Cucamonga CA Graphic Design
• The Arboretum Specific Plan Project Branding and Graphics Package | Fontana CA
• Artesia Corridor Specific Plan, Project Branding | Gardena CA • Clovis General Plan Update & EIR | Clovis CA
• El Monte General Plan & Development Code Update Graphics Package | El Monte CA
• Centennial Specific Plan Graphics Package, Tejon Ranch | Los Angeles County CA • The Meadows at Cummings Valley Master Plan Graphics Package | Tehachapi CA • Renaissance Rialto Specific Plan Graphics Package | Rialto CA • Valley Trails Specific Plan Graphics Package | Fontana CA • Santa Ana General Plan Housing Element Update Graphics Package | Santa Ana CA
• University Heights Specific Plan & Annexation Graphics Package | San Marcos CA • SCAG 2% Compass Blueprint Strategy Implementation Demonstration Projects: 3D Modeling and Visualization | Southern California

Page 961 of 1311 ends

ERIN GUY
GIS Coordinator, Associate
Erin believes that planning is a community-based profession, and she demonstrates this in her “user based” mindset and implementation of user-oriented GIS tools, online web maps, web applications, and story maps. Her professional background in public health and GIS helps her to provide meaningful data that is visually appealing, intuitive, and facilitates collaboration across communities between citizens, stakeholders, and professionals.

Before joining PlaceWorks, she gained valuable community experience in the public sector at the Tennessee Department of Environment and Conservation, where she used interactive, online web maps to display monthly data from monitoring waterways across eastern Tennessee for surface water and air pollution. Erin also has private-sector experience, for example, as a GIS analyst for RSI Entech, where she coordinated in-field and technical GIS data management for the remediation and repurposing of the K-25 Manhattan Project site in eastern Tennessee.

HIGHLIGHTS OF EXPERIENCE
• Solano Transportation Authority Multi-Jurisdictional Safety Element Update | Solano County CA
• Metrolink Station Area Analysis | SCAG Region CA
• San Mateo General Plan Update | San Mateo CA
• Downtown Oakland Zoning Code Assistance | Oakland CA
• Technical Assistance | SB 2 Planning Grants Program | Statewide • City of Ontario 2019-20 General Plan Update and EIR | Ontario CA • City of Fountain Valley 2040 General Plan Update and EIR | Fountain Valley CA • Yucca Valley 2021 Housing Element Update | Yucca Valley CA • City of Yucaipa Housing Element Update and CEQA | Yucaipa CA • Future Year SED Distribution Land Use Concepts, Western Riverside Council of Governments | Statewide
• GIS Assistance for the needs of Western Community Energy, Western Riverside Council of Governments | Riverside County CA
• Santa Barbara County Climate Change Vulnerability Analysis | Santa Barbara CA • City of Palm Springs 2019 Limited General Plan Update and EIR | Palm Springs CA
• City of La Habra Comprehensive Housing & Safety Elements | La Habra CA • Town of Mammoth Lakes Climate Adaptation and Resiliency Plan | Mammoth Lakes CA
• Inland Valley Development Agency Multijurisdictional Specific Plan | San Bernardino CA
• Riverside County General Plan Update: 6th Cycle RHNA| Riverside CA • City of San Bernardino General Plan Update and EIR | San Bernardino CA • City of Corona General Plan Update and EIR | Corona CA

EDUCATION
• Graduate Certificate, GIS for Urban
and Regional Planning, University of
Florida, Gainesville
• BS, Environmental Management,
University of Florida, Gainesville
• Certificate in GIS, Roane State
Community College, Harriman,
Tennessee
• Master of Public Health, Health
Policy/Management, University of
Tennessee, Knoxville
• BS, Dietetics, Colorado State
University, Fort Collins

AFFILIATIONS
• American Planning Association
• Board member, APA Orange County
Young Planners Group | 2020, 2021
Team member since 2020

Page 962 of 1311 ends

ERIN GUY
GIS Coordinator, Associate
[email protected]
• City of San Dimas 2021 Housing Element Update | San Dimas CA • County of San Bernardino Zoning Web Map | San Bernardino CA • Hollister General Plan Update and EIR | Hollister CA
• SCAG Economic Projection Comparison | Southern California • LEAP Grant (Housing Element Update and Bloomington Land Use/ Infrastructure Planning) | San Bernardino County CA
• Anaheim First Community Assessment | Anaheim CA
• City of Rancho Cucamonga General Plan Update EIR | Rancho Cucamonga CA • Redondo Beach Focused General Plan Update | Redondo Beach CA • City of Moorpark General Plan Update and EIR | Moorpark CA • City of Industry Housing Element Services | City of Industry CA • Dana Point 2021 Safety and Housing Elements Update | Dana Point CA • Santa Ana General Plan Update | Santa Ana CA
• Needles General Plan and Land Use Element Update | Needles CA • San Bernardino Countywide Plan and Program EIR | San Bernardino County CA • Eastvale General Plan Update | Eastvale CA
• Southeast Area Specific Plan Update | Long Beach CA
• AFFH GIS Mapping Assistance | City of Sacramento CA
• Contract Planning & CEQA Services |Wildomar CA

PRIOR EXPERIENCE
• Planning Technician | City of San Clemente | San Clemente CA • GIS Analyst | RSI Entech | Oak Ridge TN
• Environmental Planning Intern | Tennessee Department of Environment & Conservation | Oak Ridge TN

PUBLICATIONS
• “The Impact of Policy Monitoring Programs on Political Participation in Community Stakeholders ” and “Improving Health Outcomes of Obese Individuals with Community Based Interprofessional Experiential Learning Activities,” poster sessions of the 2016 Tennessee Public Health Assoc.

Conference, Franklin, TN

SPEAKING ENGAGEMENTS
• “Soil Sample Analysis of Cuba’s Oldest Tobacco Farm: Finca El Pinar Robaina” | 2018 East Tennessee Collegiate Division Meeting of The Tennessee Academy of Science | Knoxville TN
• “Public Health Implications of Cyclotron Decommissioning” | 2016 | Women in Nuclear Symposium , University of Tennessee Student Chapter | Knoxville TN AWARDS
• Linda Talarico “Women in GIS” Scholarship | Roane State Community College | 2017

Page 963 of 1311 ends

EDUCATION
Bachelor of Science in Civil Engineering, University of California, Davis, 1999

REGISTRATIONS
Licensed Traffic Engineer, State of California (TR2402)

RECOGNITIONS
WTS Honorable Ray LaHood Award Winner (Man of the Year) – Inland Empire Chapter (2023)

PRESENTATIONS
VMT Related Presentations:
 2023 UCLA Land Use Law and Policy Conference
 2022 National APA
 2022 Western ITE
 2022 CEAC Public Works Officers Institute
 2022 SBCOG City/County Conference
 2019 California APA
 2019 CSU Facilities Conference
Future of Transportation Presentations:
 2018 SBCTA City/County Conference
 2017 WRCOG Planning Conference
Parking Presentations:
 2018 OC Planning Directors Conference
 2015 OC Planning Directors Conference
 2011 SCAG Toolbox Tuesday
Emergency Evacuation Assessment – 2022 National APA
Conference
Multi-Modal Levels of Service – ULI SCIC
Innovative Interchange Designs – District 8 Professional Liaison Committee Meeting, 2011
Roundabout Operations and Feasibility – ASCE national
webinar series, 2011 through 2018
Process of Signal Coordination – ASCE national webinar series, 2011 through 2016
ABOUT
Jason D. Pack, P.E., is a Principal with Fehr & Peers located in Southern California. He is actively involved in a wide variety of project work but also finds time to lead the firm’s research and development efforts in Emergency Evacuation assessment. Jason has an extensive background in travel demand forecasting, traffic operations assessment (including micro-simulation assessment), VMT analysis, big data analysis, transit ridership forecasting, and transportation impact studies involving NEPA and CEQA. His focus is to utilize his experience and the technical resources of the company to help clients answer their toughest questions related to mobility.

His recent work has included forecasting and operations assessment for large infrastructure improvements, developing recommendations for SB 743 implementation (California's new requirements to consider VMT as an impact metric under CEQA), assisting agencies with establishing VMT banks/exchanges, emergency evacuation assessment to respond to new legislative requirements (SB 99 and AB 747) and development of innovative transportation policies to assist City's advancing transportation into the future.

PROJECT EXPERIENCE
CEQA/NEPA Assessment
Jason has completed transportation assessments for over 150 projects in support of CEQA or NEPA documentation. These include impact assessment to support negative declarations, transportation sections for EIRs, and transportation sections for EISs or joint EIR/EISs.

Jason has actively been involved in assisting jurisdictions with SB 743 implementation. Example projects are noted below:
 WRCOG VMT SB 743 Implementation Study, CA
 SBCTA SB 743 Countywide VMT SB 743 Implementation
Phase I, CA
 SBCTA SB 743 Countywide VMT SB 743 Implementation
Phase II (VMT mitigation bank/exchange program), CA

Jason Pack, TE
Principal

Page 964 of 1311 ends

 North Orange County Collaborative VMT SB 743
Implementation Study/Guidelines, CA
 CSU SB 743 Guidelines, CA
 County of San Bernardino Transportation Impact
Study Guidelines, CA
 Corona SB 743 Implementation, CA
 Eastvale SB 743 Implementation, CA
 Moreno Valley SB 743 Implementation, CA
 Villages at Lakeview Traffic Impact Study, Riverside
County, CA
 Riverside Housing Element Traffic Impact Study, CA
General Plans
Jason has worked on a wide variety of General Plans
throughout the state of California, including:
 City of Beaumont
 City of Rancho Cucamonga
 City of Palm Springs
 City of Indio
 City of Moreno Valley
 City of Carlsbad
 City of Redlands
 City of Corona
 City of Montclair
 City of Westminster
 County of San Bernardino
 City of Fountain Valley
 City of San Marcos
 City of Chico
 City of Saratoga
 City of Rancho Cordova

Most of these projects included Complete Street elements, extensive travel demand forecasting, and some level of multi- modal transportation assessment.

Specific Plans/Master Plans/Corridor Plans
Jason has completed assessment for more than 20 specific plans, master plans, and corridor plans. Key projects are identified below:
 Beach Boulevard Corridor Specific Plan - Evaluated a land use plan along Beach Blvd in Anaheim including
vehicle and multi-modal capacity assessment
 MAG High Capacity Transit Corridors Sustainability
Study – Evaluating the benefits of providing transit
oriented development along the high capacity transit
corridors in the greater Phoenix area
 RTC of Southern Nevada High Capacity Transit Study
– Evaluating the benefits of providing transit oriented development along the high capacity transit corridors
in the Las Vegas area
 Long Beach Boulevard Corridor Specific Plan –
Completing the transportation recommendations and
assessment for this corridor in the City of Long Beach
including extensive multi-modal assessment
 Cal Poly Pomona Master Plan – Completed the
transportation recommendations and assessment of the
proposed University Master Plan
 Holt Boulevard Corridor Plan – Assessing the corridor in the City of Ontario to consider multi-modal opportunities along the corridor (including a Bus Rapid Transit
application)
 Wine Country Community Plan – Assisted Riverside
County in developing a travel demand forecasting model
and evaluation of the plan for the Temecula Wine Country Area
 CollegeTown Specific Plan – Assessing redevelopment of the block south of the Cal State Fullerton Campus
including the closure of Nutwood Avenue, application of a street car through the project, and mixed-use
development on the site (including Hope International
University, retail, housing, and other development
opportunities)
 San Bernardino Bus Rapid Transit TOD Overlay Study –
Assisting in developing transportation strategies in support of TOD along the SBx BRT system
Impact Fee Programs, Banks, and Exchanges
Jason has led Fehr & Peers involvement in the development of both traditional traffic impact fee programs in addition to fees, banks, and exchanges. Key projects are noted below:
 SBCTA VMT Mitigation Bank Feasibility Study
 WRCOG VMT Mitigation Fee/Bank/Exchange Feasibility
Study
 City of Orange VMT and LOS Traffic Impact Fee Program  CVAG Transportation Uniform Mitigation Fee Program
(TUMF), Transportation Prioritization and Planning Study (TPPS), and Regional Arterial Cost Estimates (RACE) project  Westminster Traffic Impact Fee Program
 Kern COG KARGO Fee Program (truck/logistics fee
program)
 Riverside County Transportation Commission
Truck/Logistics Fee Program
 City of Rancho Cucamonga Traffic Impact Fee Program
 City of Grass Valley Traffic Impact Fee Program
 WRCOG AB 602 Assessment (considering building size in the fee calculation)

Page 965 of 1311 ends

Paul Herrmann, TE
Senior Associate

EDUCATION
BS, Civil Engineering, California Polytechnic State
University, Pomona, CA (2011)

REGISTRATIONS
Licensed Traffic Engineer, CA (TR2797)

PRESENTATIONS
 SB 743 in OC, City Engineers Association of
Orange County (CEAOC), 2020
 SB 743 in Riverside & San Bernardino, Institute
of Transportation Engineers Riverside/San
Bernardino Chapter (RSBITE), 2020
 Preparing For A Post VMT World Apocalypse,
Association of Environmental Professionals
(AEP) Conference, 2020
ABOUT
Mr. Herrmann has eleven years of experience in
transportation engineering and transportation
planning at Fehr & Peers. Prior to Fehr & Peers,
Paul worked at the City of Corona in the Traffic
Engineering Department for two years. He has
led a wide variety of projects including traffic
studies, infrastructure projects, travel demand
forecasting, parking and circulation studies, and
long-range development plans. Mr. Herrmann is
an expert in SB 743 Implementation and VMT
Analysis for CEQA projects. Mr. Herrmann is also
an active member in the Fehr & Peers SB 743
Working Group and Safety Group which hold
weekly discussions on evolving industry best
practices. Mr. Herrmann serves clients
throughout Southern California with projects
throughout the SCAG region.

PROJECT EXPERIENCE
CEQA/NEPA Assessment
Paul has completed transportation assessments for over 50 projects in support of CEQA or NEPA documentation. These include impact assessment to support negative declarations, transportation sections for EIRs, and transportation sections for EISs or joint EIR/EISs.

Significant environmental transportation impact assessments that Paul has led are noted below:
 Villages at Lakeview Traffic Impact Study, Riverside County, CA  Riverside Housing Element Traffic Impact Study, CA
 Ontario Airport Cargo Facility EIR, Ontario, CA
 Riverside County Arena TIA, Palm Desert, CA
 City of Anaheim Beach Boulevard Corridor Plan Traffic Study and EIR, Anaheim, CA
 Subarea 29 Residential Project Subsequent EIR, Ontario, CA  Etiwanda Heights Neighborhood and Conservation Plan/EIR, Rancho Cucamonga, CA
 City of Anaheim Beach Boulevard Corridor Plan Traffic Study and EIR, Anaheim, CA
 Gateway at Grand Terrace Specific Plan EIR, Grand Terrace, CA  Section 31 Specific Plan EIR, Rancho Mirage, CA,
 Crossings Specific Plan Traffic Study & EIR, Fountain Valley, CA  Long Beach Blvd Specific Plan, Long Beach, CA
 South East Area Specific Plan, Long Beach, CA

Paul has actively been involved in assisting jurisdictions with SB 743 implementation and writing City’s Transportation Impact Study Guidelines.

Example projects are noted below:
 Anaheim SB 743 Implementation and TIA Guidelines
 Santa Ana SB 743 Implementation and TIA Guidelines
 Aliso Viejo SB 743 Implementation and TIA Guidelines
 Fountain Valley SB 743 Implementation and TIA Guidelines  Corona SB 743 Implementation and TIA Guidelines
 Eastvale SB 743 Implementation and TIA Guidelines
.

Page 966 of 1311 ends

 Moreno Valley SB 743 Implementation & Impact Fee
Feasibility Study
 Ontario SB 743 Update and TIA Guidelines, CA
 Hemet SB 743 Implementation and TIA Guidelines
On-Call Consulting Services
Paul serves as an on-call consultant for several cities and agencies for traffic engineering and planning services. Key active on-call contracts are noted below.
 City of Eastvale Traffic Engineering and Planning
 Cal Poly Pomona Transportation Design and Planning
Services
 City of Santa Ana CEQA Peer Review
 City of Corona Transportation Study Peer Review
 City of Menifee CEQA Peer Review
General Plans
Paul has worked on a wide variety of General Plans throughout the state of California, including:
 City of Ontario
 City of Chino
 City of Lake Elsinore
 City of Moreno Valley
 City of Redlands
 City of Corona
 County of San Bernardino
 City of Fountain Valley
 City of Diamond Bar
 City of Los Alamitos
 City of Anaheim

These projects included providing support for the EIR through travel demand forecasting, VMT assessment, and LOS
assessment.

Parking Studies
Paul has completed numerous parking assessments. Key
studies are identified below:
 Agua Caliente Band of Cahuilla Indians Casino Studies in Palm Springs, Cathedral City and Rancho Mirage,
CA
 100 E. Ocean Boulevard Hotel Project, Parking, Traffic & TDM Study, Long Beach, CA
 Downtown Fullerton Parking Study, Fullerton, CA
Grant Applications
Paul has assisted with eh development of grant applications by providing transportation metrics on several assessments.

Example studies are identified below:
 Potrero Boulevard Interchange TCEP Grant,
Beaumont, CA
 Crown Valley Parkway Widening RAISE Grant, Laguna
Niguel, CA
 I-15 & SR-74 Interchange Improvement TCEP Grant,
Lake Elsinore, CA
 Santa Ana Boulevard Grade Separation SAGS Grant,
Santa Ana, CA
 Market Street Bridge Widening BIP Grant, Riverside,
CA
 Mission Boulevard Bridge Improvement BIP Grant,
Riverside County, CA
 McKinley Grade Separation TCEP Grant, Corona, CA
Emergency Evacuation Planning
Paul has managed several emergency evacuation assessments consistent with AB 747, AB 1409, and SB 99. Example projects are noted below:
 Moreno Valley general Plan Update Evacuation
Assessment, CA
 Richmond Safety Element Update Evacuation
Assessment, CA
 Calabasas Housing Element Update Evacuation
Assessment, CA
 Lafayette Safety Element Update Evacuation
Assessment, Lafayette, CA
 Ontario Evacuation Assessment, CA
 City of Orange Evacuation Assessment, CA
University projects
Paul has completed a variety of studies for community colleges and four-year institutions. Paul currently is an active member of the company’s CSU Working Group that ensures consistency with studies completed for all campuses. Key projects are noted below:

 On-Call Transportation Engineering/Planning Services, Cal Poly Pomona, Pomona, CA
 University Shuttle Only Lane Design
 Campus Master Plan Update & EIR
 TDM Plan
 Kellogg Dr. & University Dr. Signal Design
 On-Campus Bike Lane Design
 CSUSB Master Plan Traffic Study & EIR, San
Bernardino, CA
 RCCD Inland Empire Technical Trade Center Study,
Riverside, CA
 UC Irvine Safety Mitigation Study
 UC Irvine Hydrogen Fuel Project Transportation Study
 CollegeTown Specific Plan & EIR, Fullerton, CA
 Moreno Valley Community College Master Plan
Update, Moreno Valley, CA
 Bonita High School Parking Lot Access Study, La
Verne, CA

Page 967 of 1311 ends

Jeremy Adams
ECORP’s Project Manager/Senior Architectural Historian/Senior II Mr. Adams is a Cultural Resources Manager and Senior Architectural Historian with 14 years of experience in developing cultural resources management strategies and leading the implementation of cultural inventories, evaluations, effects analysis, and preparation of mitigation documents. He holds a Master of Arts degree in History (Public History), a Bachelor of Arts degree in History, and he meets the Secretary of the Interior's Professional Qualification Standards for Architectural History and History. Mr. Adams serves as principal investigator for all architectural history components of projects and is well versed in the practical application of the laws and regulations of Section 106 of the National Historic Preservation Act (NHPA) and California Environmental Quality Act (CEQA). He is highly skilled at historical research and analysis and is familiar with numerous archives, libraries, museums, and other historical repositories throughout California.

He has prepared historic contexts, property histories, and carried out architectural site documentation for buildings, structures, and historical landscapes. He has also prepared built-environment impact assessments and has developed mitigation measures for CEQA and Section 106 projects. In addition, he has carried out all three versions of Historic American Buildings Survey (HABS), Historic American Engineering Record (HAER), Historic American Landscapes Survey (HALS) documentation, developed educational interpretive panels, has completed Caltrans Standard Environmental Reference documents, multiple versions of Finding of Effect documents, and has evaluated numerous historic-age buildings and properties, as well as assisted lead agencies with State Historic Preservation Officer (SHPO) consultation. As the manager of ECORPs cultural resources department in Rocklin, he has led numerous cultural resources studies and is the principal investigator and author for multiple architectural history studies.

Education
M.A., History (Public History), California State University, Sacramento B.A., History, California State University, Chico
Professional Experience
Lincoln Avenue Widening Project (East Street to Evergreen Street), Orange County – City of Anaheim as a Sub to Ardurra. Architectural Historian responsible for the inventory and evaluation of 23 historic-age buildings and structures along East Lincoln Avenue in Orange County, California. The project required assessment of indirect project impacts to adjacent buildings and a thorough documentation effort of the historic-age residential houses, motels, and commercial buildings within the project area. The evaluations required development of multiple historic contexts appropriate for the evaluations of many types of buildings associated with different historical themes. In addition, the evaluation required archival research, detailed property descriptions, and a high-level impact assessment.

Architectural History Inventory and Evaluation of Villa Park High School Modernization Project, Orange County – Orange Unified School District as a sub to PlaceWorks, Inc. Architectural Historian responsible for developing the strategy for inventory and archival research of Villa Park High School and supervising the evaluation of the school, including QA/QC. In support of CEQA, the proposed

Page 968 of 1311 ends

Jeremy Adams, M.A. (Continued)

Page 2 of 2 ends

modernization project required the recordation of each historic-age building located on the school property. The field effort included recording 10 buildings and structures on DPR 523 records, including archival research. Directed the evaluation of the school and its buildings against the CRHR eligibility criteria.

Architectural History Inventory and Evaluation of Orange High School Modernization Project, Orange County – Orange Unified School District as a sub to PlaceWorks, Inc. Architectural Historian responsible for developing the strategy for inventory and archival research of Orange High School and supervising the evaluation of the school, including QA/QC. In support of CEQA, the proposed modernization project required the recordation of each historic-age building located on the school property. The field effort included recording 20 buildings and structures on DPR 523 records, including archival research. Directed the evaluation of the school and its buildings against the CRHR eligibility criteria.

Historical Resources Evaluation Report (HRER) for the Milligan Drive Bridge Project, Orange County – City of Laguna Beach as a sub to Ardurra. Architectural Historian and Assistant Cultural Resources Manager responsible for the inventory and evaluation of the Milligan Drive Bridge, Orange County. The project was subject to PRC 5024 and compliance with Caltrans SER under the MOU for state-owned historical resources. Supervised the field and archival research effort, prepared the historical context, and wrote the evaluation for every historic-age building and structure within the architectural PAL for the project. The HRER was attached to the HRCR for the 5024 project.

Imperial Beach Resort, San Diego County – Imperial Beach Resort, LLC. Architectural Historian responsible for the inventory and evaluation of historic-age buildings within the proposed resort development area in support of the Initial Study. The project required recordation and thorough documentation of a historic-age duplex building within the project area. The evaluation required development of an historical context for Imperial Beach and an evaluation of the building which required archival research, detailed property descriptions, and a high-level impact assessment.

Vermont Corridor Development Plan Project, Los Angeles County – Los Angeles County Public Works. Architectural Historian responsible for the inventory and evaluation of every historic-age building located within the Vermont Corridor Development Plan area. The project first required an extensive constraints analysis which included some archival research, records search, review of local historical databases and resource lists, assessment of potential project impacts, and a letter report of the findings submitted to the County. Once constraints were identified, a complete inventory and evaluation of all historic-age buildings located within the area of direct and indirect impact for the project was conducted.

The inventory and evaluation included a week-long inventory of the project area, extensive archival research, coordination with city and county agencies, multiple client meetings and coordination efforts, and a substantial evaluation report submitted to the County.

Beautiful Church Camp Conifer Project, San Bernardino County – Beautiful Church. Architectural Historian and Assistant Cultural Resources Manager responsible for the evaluation of an historic-age recreational campground located in San Bernardino National Forest. The project required preparation of a detailed site map identifying buildings and structures located within the campground, archival research, and evaluation of eligibility for the NRHP and CRHR. Supervised the cultural resources studies and coordinated with the USFS and supported SHPO consultation.

Page 969 of 1311 ends

Seth Myers
Senior Air Quality/Greenhouse Gas/Noise Specialist
With 18 years of experience as an environmental planner and air quality/noise analyst, Mr. Myers is involved in the preparation of a full range of CEQA and NEPA environmental compliance and review documents including environmental impact reports. He has extensive expertise conducting air quality, greenhouse gas emissions, and noise analyses and has a comprehensive working knowledge of the associated regulatory environment. He is proficient in the use of CalEEMod, EMFAC, AERMOD, SoundPLAN, the Roadway Construction Model, the Federal Highway Administration (FHWA) Highway Traffic Noise Prediction Model, and other industry standard emissions and noise modeling tools. In addition, Mr. Myers prepares implementation documents and programs such as zoning ordinance updates, design review programs, and planning program guidelines.

Education
B.A., Environmental Studies and Planning (Minor in Biology), Sonoma State University, California Registrations, Certifications, Permits and Affiliations  FAA Noise and Air Emissions Trainings: Noise and Emissions Fundamentals, Aviation Environmental Design Tool (AEDT), U.S. Department of Transportation Volpe Center Professional Experience
Audi Fletcher Jones Project, Orange County – City of Costa Mesa (2019). Analyzed the potential emissions and noise-related effect of the proposal to demolish an existing lumber yard and retail building on the site and construct a sales and service center for Audi.

Ganahl Lumber Hardware Store & Lumber Yard Project, Orange County – San Juan Capistrano (2017-2019). The proposed Project includes a Ganahl Lumber Hardware store containing a lumber yard with a will-call storage area, a delivery truck loading bay, industrial yard, and miscellaneous ancillary equipment such as forklifts. The other proposed uses on the site include restaurants and a 5.4-acre vehicle storage area. In close proximity to sensitive noise receptors, on-site noise levels of proposed lumber yard activities were based on actual noise measurements conducted at the existing Ganahl Lumber facility in Costa Mesa. These measurements were verified with previous research conducted by ECORP, as well as previous noise analyses prepared for other hardware stores proposed by Ganahl Lumber.

Septic to Sewer Project, Orange County – City of Santa Ana (2019). Analyzed the potential emissions and noise-related effect of installing sewer mains and lateral connecters to transfer existing residences and businesses currently employing the use of septic systems to the City’s sewer systems. The Project site encompasses 635 linear feet entirely within the public right-of-way.

Page 970 of 1311 ends

Seth Myers (Continued)

Page 2 of 2 ends

Hospital Frontage Road/Justice Center Way Pavement Rehabilitation Project, Orange County – OC Public Works (2018). In support of a categorical exemption, analyzed emissions and noise-related effects of the proposed Project, which included the removal and replacement of asphalt pavement along Hospital Frontage Road and Justice Center Way and ancillary roadway improvements. Primary environmental issues involve the effects of nighttime noise generated during Project construction.

Verdugo Street Beautification Project, Orange County – City of San Juan Capistrano (2018). The Verdugo Street Beautification Project consists of the construction of widened sidewalks, landscaping, irrigation, storm drain, utilities, ADA ramps, rolled curb, enhanced paving, enhanced lighting, and street furniture, to provide for a more pedestrian friendly downtown adjacent to the City’s train station, parking structure, and the Historic Los Rios District.

Gate 12 Improvement Plan Project, Orange County – City of Laguna Woods (2010). Prepared the initial study analyzing the potential environmental effects of a series of facility improvements within Laguna Woods Village Gate 12 in Laguna Woods. The improvements include the removal of the existing clubhouse and a portion of the auxiliary building, and the construction of a new clubhouse (The Main Lounge) and the creation of an event lawn for use with special events, along with a total increase of 65 parking stalls. Issues included the potential to encounter lead paint and/or asbestos during proposed demolition activities and the effects of noise on the surrounding community.

Ontario Avenue Widening Project, Riverside County – City of Corona (2020). Prepared an air quality, greenhouse gas emissions, and noise impact assessment for the Ontario Avenue Widening Project (Project), which includes a congestion relief effort involving the widening of an approximately 2,000 feet portion of Ontario Avenue in the City of Corona. The severity of impacts was determined based upon the comparison of AM and PM peak hour vehicle idling times during existing conditions and post-Project implementation conditions.

Third Party Review of Mt. SAC Educational and Facilities Master Plan, Los Angeles County – City of Walnut (2018-2019). Peer-reviewed the EIR prepared for the Project, which identifies the framework for the uses and development of land on campus necessary to accommodate an identified level of enrollment and physical development. While the proposed 2018 Master Plan identifies the physical resources necessary to meet Mt. SAC’s mission and its long-range development plans, it makes no commitments regarding the timing for achieving identified enrollment projections or implementing physical development in order to respond to future funding decisions, demographics, and other factors external to the proposed 2018 Master Plan process.

Mediterranean Apartments, San Bernardino County – City of Victorville (2020). The Project proposed 18 apartment buildings made up of 440 apartment units. The Project also includes a common clubhouse and several outdoor amenities, including a pool. The apartment complex would include a total of 891 parking spaces; 310 of which would be covered by carports with solar photovoltaic (PV) panels. EV chargers powered by these PV panels would be provided. Prepared the air quality, greenhouse gas emissions, energy consumption and noise analyses. .

Page 971 of 1311 ends

Stacie Tennant
Senior Wildlife Biologist/Project Manager
Ms. Stacie Tennant has more than 25 years of experience as a Wildlife Biologist/Project Manager. She has extensive experience in conducting and coordinating sensitive species surveys; focused surveys for Threatened/ Endangered plant and wildlife species; reconnaissance surveys; and habitat evaluations for Endangered, Threatened, and sensitive floral and faunal species; processing resource agency permits; and managing projects for multiple industries including transportation, water, electric utilities, and private development. She has authored and managed the development of biological resources sections of numerous Environmental Impact Reports (EIRs); Initial Study/Mitigated Negative Declaration’s (IS/MND’s); Biological Technical Reports; Biological Assessments (pursuant to Section 7 consultations with the U.S. Fish and Wildlife Service [USFWS]); Natural Environment Studies (NESs) (pursuant to California Department of Transportation [Caltrans] guidelines); focused surveys for sensitive species; tree reports; resource management plans; mitigation monitoring reports; Habitat Assessments and Determination of Biologically Equivalent or Superior Preservation (DBESP) Reports for the Western Riverside County MSHCP; and general biological assessments and constraints analyses. She is experienced at implementation of field programs to track, report, and support compliance requirements and mitigation measures.

Professional Experience
On-Call Contract Planning/CEQA Staff Augmentation Services, Riverside County – City of Wildomar as a Sub to PlaceWorks (2020-Ongoing). Project Manager responsible for coordinating with City planning and engineering staff and serving as extension of staff to address biological and MSHCP compliance issues.

Ranchero Road Widening Project, San Bernardino County – City of Hesperia as a Sub to Angenious Engineering Services, Inc. (2021-Ongoing). Project Manager for the widening of Ranchero Road from its current two-lane configuration to a four-lane facility. Overseeing all pre-construction surveys, biological monitoring, and reporting for the project. Ensuring the project remains in compliance with all permits and the Mitigation Monitoring and Reporting Program. Currently working on obtaining the Incidental Take Permit for Joshua trees.

Hillwood Ethanac Project, Riverside County – Albert A. Webb & Associates (2022-Ongoing). Project Manager responsible for overseeing a biological resources assessment of a property proposed for development. The assessment included a literature review and a field survey to identify plant communities, wildlife species and sensitive habitats, including burrowing owl habitat. A report was prepared that contained the results of the survey and information about potential biological constraints to the proposed residential development. The report also contained a Western Riverside County Multiple Species Habitat Conservation Plan Consistency Analysis.

Phelan Road Widening Project, San Bernardino County – County of San Bernardino, Department of Public Works as a Sub to EXP US Services, Inc. (2021-Ongoing). Project Manager for the widening of a

Page 972 of 1311 ends

Stacie Tennant (Continued)

Page 2 of 2 ends

12.1-mile-long section of Phelan Road between State Route 138 and Los Banos Avenue. Currently overseeing all focused special-status plant and wildlife surveys and reporting for the project. An IS/MND and NES will be prepared for the project.

Federal As-Needed Environmental Compliance Services for Programs Development Division, Los Angeles County – Los Angeles County Public Works (2021-2023). Task Order Manager in support of Los Angeles County Public Works contract providing environmental documentation services (IS/MNDs and EIRs), regulatory permit services, environmental permit compliance services, and environmental mitigation services for Federal projects or federal-aid or state funded projects.

Mission Hospital Pipeline Improvements, Orange County – Wood Rogers, Inc. (2022). Biological Project Manager responsible for overseeing a biological reconnaissance survey and focused special-status plant and coastal California gnatcatcher surveys for a pipeline improvement project in Orange County, California. Following the surveys, a Biological Technical Report and IS/MND was prepared.

Pioneertown Coffee Shop Project, San Bernardino County – Pioneer Development, LLC (2022).

Project Manager responsible of overseeing a biological reconnaissance-level survey and report prepared in support of CEQA for the proposed coffee shop project. Vegetation communities and wildlife habitats were characterized, and to determine if suitable habitat for sensitive biological resources was present. A Joshua tree inventory was conducted at the time of the survey.

Substation Projects, Riverside and San Bernardino Counties – Southern California Edison (2010- 2018). Project Manager for several Southern California Edison’s (SCE’s) Substation projects, which involved vegetation mapping, focused special-status plant/wildlife surveys, wetland delineations, and preparation of Biological Resources Technical Reports, and biological resources sections of Proponent’s Environmental Assessment Reports and EIRs.

Edinger Avenue Bridge Replacement, Orange County – OC Public Works (2016-2019). Project Manager for a Bridge Replacement Project in the City of Huntington Beach from design planning, project execution until project completion. Oversaw all biological surveys including focused surveys for special status plant and wildlife species. Wrote the Natural Environmental Study (NES) pursuant to Caltrans guidelines, the biological resources section of an Initial Study/Mitigation Negative Declaration, and the Biological Assessment (pursuant to USFWS Section 7 Consultation). Obtained all the permits for the project (i.e., 1602 permit, Nationwide Permit, Coastal Development Permit). Served as the main point of contact for the Project Construction Manager hired by the County of Orange and oversaw the environmental compliance program.

Lincoln Boulevard, Los Angeles County – City of Los Angeles (2016-2019). Senior Project Manager for a Bridge Replacement Project in the City of Los Angeles. Oversaw all biological surveys including focused surveys for special status plant and wildlife species. Wrote the Natural Environmental Study (NES) pursuant to Caltrans guidelines.

Page 973 of 1311 ends
Page 974 of 1311 ends

Office Location
3 MacArthur Place, Suite 1100, Santa Ana, CA 92707
714.966.9220 | 714.966.9221 (f)
Additional Offices
Inland Empire | Los Angeles | Bay Area | Sacramento | Central Coast placeworks.com

Page 975 of 1311 ends

3 MacArthur Place, Suite 1100 | Santa Ana, California 92707 | 714.966.9220 | PlaceWorks.com J. COST
March 15, 2023
Grace Wichert
Procurement and Contracts Specialist

CITY OF BEAUMONT
550 E. 6th Street
Beaumont, CA 92223
Subject: Cost Proposal to accompany Statement of Qualifications for On-Call Planning and Environmental Services
Dear Ms. Wichert:

Please find attached copies of PlaceWorks’ and our subconsultants’ standard fee schedules.

We understand the significance of this effort and look forward to discussing our qualifications with you in greater detail. This proposal shall remain valid for 90 days from the date of submittal. As a Principal, I am authorized to bind the team to the contents of this submittal and to negotiate contracts on behalf of PlaceWorks. Please contact me at 714.966.9220 x 2730 or [email protected] with any questions.

We look forward to your response.

Respectfully submitted,

PLACEWORKS
Mark Teague AICP
Managing Principal, Environmental Services

Page 976 of 1311 ends

PlaceWorks – 2023 Standard Fee Schedule
Staff Level Hourly Bill Rate
Principal $210–$335
Associate Principal $195–$275
Senior Associate II $170–$260
Senior Associate I $160–$215
Associate II $135–$190
Associate I $125–$175
Project Planner $105–$165
Planner $90–$145
Graphics Specialist $90–$155
Administrator $145–$200
Clerical/Word Processing/Technical Editor $45–$150
Intern $80–$115
Subconsultants are billed at cost plus 10%. Mileage reimbursement rate is the standard IRS-approved rate. Possible yearly increase of 5% on bill rates. 2023_v.1_(01-09-23)

Page 977 of 1311 ends

Fehr & Peers reserves the right to change these rates at any time with or without advance notice.

2022-2023
(July 2022 through June 2023)
Hourly Billing Rates

Classification Hourly Rate

Principal $240.00 - $375.00
Senior Associate $205.00 - $300.00
Associate $175.00 - $255.00
Senior Engineer/Planner $160.00 - $215.00
Engineer/Planner $130.00 - $175.00
Senior Engineering Technician $150.00 - $215.00
Senior Project Accountant $170.00 - $190.00
Senior Project Coordinator $130.00 - $180.00
Project Coordinator $120.00 - $170.00
Technician $150.00 - $170.00
Intern $95.00 - $140.00

 Other Direct Costs / Reimbursable expenses are invoiced at cost plus 10% for handling.
 Personal auto mileage is reimbursed at the then current IRS approved rate (58.5 cents per mile as of Jan 2022).
 Voice & Data Communications (Telephone, fax, computer, e-mail, etc.) are invoiced at cost as a percentage of project labor.

Page 978 of 1311 ends

www.ecorpconsulting.com

FEE SCHEDULE FOR PROFESSIONAL SERVICES
ECORP Consulting, Inc. – 2023 Rates*
Principal I-IV* .............................................................................................................................................. $225-$350 Senior I-IV* .................................................................................................................................................. $160-$210 Staff I-III* ...................................................................................................................................................... $135-$150 Associate I-III* ............................................................................................................................................. $105-$125 Assistant I-III* ................................................................................................................................................ $85-$100 Technician I-III* ...............................................................................................................................................$65-$85 GIS Specialist I-III ....................................................................................................................................... $120-$165 GIS Technician ....................................................................................................................................................... $100 Technical Editor ..................................................................................................................................................... $155 Publications Specialist I-II ....................................................................................................................... $100-$120 Accountant I-III ........................................................................................................................................... $115-$160 Clerical ....................................................................................................................................................................... $90 *Technical classification includes biologists, regulatory permitting specialists, archaeologists, architectural historians, paleontologists, air quality/greenhouse gas specialists, noise specialists, planners, CEQA/NEPA specialists, UAS pilots, and other technical professionals.

Other Direct/Reimbursable Costs
 Reproduction, equipment and other direct expenses are reimbursed at cost plus a 14-percent administrative handling charge (excluding mileage).  Mileage will be billed at the current IRS rate, adjusted annually.  Subcontractor expenses are reimbursed at cost plus a 12-percent administrative handling charge.  Expert Witness Testimony, including Depositions, is billed at time and a half.  Rental vehicles will be charged at the current standard daily rate, typically $100 per day.  Per Diem, depending upon geography, may be charged if overnight stays are required.  Non-standard invoicing will be billed at the hourly rates for support personnel.  Hourly rates will escalate at a rate of 3% per annum.

Page 979 of 1311 ends

ON-CALL PLANNING AND

ENVIRONMENTAL

SERVICES
City of Beaumont
Proposal | March 16, 2023
Submitted To:

Grace Wichert, Procurement and Contracts Specialist
City of Beaumont, 550 E 6th Street, Beaumont, CA 92223

Page 980 of 1311 ends

1City of Beaumont
On-Call Planning and Environmental Services

TABLE OF CONTENTS
A Cover Letter 2
B Introduction/Information 4
C Firm Approach 9
D Firm Profile 12
E Principal Office Location 13
F Proposed Team 14
G References 17
H Scope of Services 19
I Cost Proposal 23
J Additional Information 23
K Insurance 24
L Appendix 25
1Client Name | Project NamePage 981 of 1311

Balancing the Natural and Built Environment
March 16, 2023
Grace Wichert
Procurement and Contracts Specialist
City of Beaumont
550 E. 6th Street
Beaumont, CA 92223
Subject: On-Call Planning and Environmental Services
Dear Ms. Wichert:

Thank you for the opportunity to provide a proposal for On-Call Planning and Environmental Services.

It is our understanding that the City of Beaumont (City) anticipates a variety of professional services including Environmental Impact Reports (EIR), Mitigated Negative Declarations (MND), Negative Declarations (ND), Initial Studies (IS), and/or technical studies. Psomas’ Environmental Group has prepared environmental documentation services for projects in Southern California for 25 years. The Psomas team will be led by Jennifer Marks as Principal in-Charge and Charles Holcombe, MBA, as Project Manager.

Charles is a new addition to the team; therefore, our proposal highlights experience for the Psomas team and for Charles exclusively to show our combined capabilities.

Charles will be the primary contact for the City, will be responsible for preparation of the California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) documents, will coordinate with all technical staff and team members, and will confirm the projects stay within schedule.

Charles has 17 years of experience in the preparation of CEQA and NEPA documentation and has worked for the City successfully preparing and revising an IS/MND for the Brookside South Recharge Project, as well as managing the Beaumont Industrial Park EIR and Crossroads Industrial Park Complex Addendum.

Jennifer has 24 years of experience in the preparation of environmental documentation pursuant to CEQA, including mixed-use, infill, and transit-oriented development projects, many located in the Inland Empire.

She will serve as the contract administrator with the authorization to bind Psomas to the contract and will provide Quality Assurance/Quality Control for projects completed under the On-Call contract.

A scope of work, with clear expectations for level of effort and deliverables, and adherence to schedules are essential criteria for excellent client service. Psomas will provide a detailed scope of work that is responsive to the needs of the RFP, project-specific issues, and City and Applicant concerns for individual projects. Each scope of work will include a breakdown of fee estimates by task, with clear demarcation between anticipated professional and direct fees. Regardless of the project, Psomas provides effective and efficient CEQA and NEPA documentation and consulting services by:1650 Spruce Street Suite 400
Riverside, CA 92507
Tel 951.787.8421
www.Psomas.com

COVER LETTER
Section A

Page 982 of 1311 ends

f Ensuring consistency among data, assumptions for the project description, and all topical issues and reports
f Coordinating with the lead agency to determine the appropriate analytic approach to ensure consistency with other similar projects
f Conducting early consultation with applicable resource agencies if there are complex issues to be resolved
f Ensuring that mitigation measures are reasonable, practical, and enforceable f Conducting field surveys in the area to identify all relevant land uses and activities that may be adversely impacted in the neighborhood and City
f Maintaining awareness of current regulatory issues and trends that may affect the project Psomas has a clear understanding of the City’s expectations regarding analysis approach, level of detail, and environmental review that would be required for this contract. Psomas’ combined local knowledge and extensive experience with CEQA/NEPA will provide the City with a uniquely qualified consulting team for the preparation of environmental documentation.

As a Vice President and Principal of Psomas, I, Jennifer Marks, am authorized to bind Psomas contractually.

I maintain an office in our Santa Ana office located at 5 Hutton Centre Drive, Suite 300, Santa Ana, CA 92707.

This cover letter constitutes certification, under penalty of perjury, that Psomas complies with nondiscrimination requirements of the State and Federal Government. We acknowledge and confirm receipt of Addendum No. 1, issued on March 7, 2023. If you need additional information or have any questions, please contact me by phone at 714.481.8041 or email at [email protected].

Sincerely,

Jennifer Marks Charles Holcombe III, MBA
Vice President/Principal-in-Charge Project Manager
City of Beaumont
March 16, 2023

Page 2 of 2 ends
Page 983 of 1311 ends

4City of Beaumont
On-Call Planning and Environmental Services

B INTRODUCTION/INFORMATION
and documents; and regulation compliant document
processing. We are committed to fostering trust-
based client relations that will last well beyond any
single project.

Understanding of Services
As a leader in the field of environmental analysis,
Psomas helps clients successfully navigate the
increasingly complex processes required by CEQA
and NEPA. Psomas strives to work with clients to
ensure that project designs are conceived in a way
that minimize environmental impacts before starting
the CEQA process. For instance, when preparing an
Environmental Impact Report (EIR) or other CEQA
document, we challenge our staff and our clients
to collaborate in order to find opportunities for
avoidance of—rather than mitigation for—significant
environmental impacts. While avoidance is not always
possible, time spent at the beginning of a project’s
EIR process to address potential constraints can
often prevent or minimize costly mitigation and time
during the public review and permitting process.

The following are just some of the CEQA and NEPA
compliance documents Psomas can prepare for
projects within the City of Beaumont:

CEQA Documentation
f Categorical Exemptions (CEs)
f Initial Studies (ISs)
f Negative Declarations (NDs)
f Mitigated Negative Declarations (MNDs)
f Sustainable Community Environmental
Assessments (SCEAs)
f Environmental Impact Reports (EIRs)
f Addenda
SUBMITTING FIRM:

PSOMAS
1650 Spruce Street , Suite 400
Riverside, CA 92507
951.787.8421
PRIMARY CONTACT:

Charles Holcombe III, MBA
Project Manager
951.300.2820
[email protected]
Overview
For over 25 years, Psomas has provided environmental
impact analyses and California Environmental
Quality Act (CEQA)/National Environmental Policy
Act (NEPA) documentation for a variety of projects
including, but not limited to, infill, mixed-use,
residential, retail/commercial, office, resort/hotel,
industrial, and infrastructure for public and private
sector clients. We have a team that can provide the
City of Beaumont with the highest level of service and
expertise in CEQA and NEPA documentation and in-
house related technical analyses/studies, including:
f Air Quality, Greenhouse Gas (GHG) Emissions,
and Energy Analyses
f Health Risk Assessments
f Noise and Vibration Studies
f Cultural Resources Assessments and
Monitoring
f Tribal Cultural Resources Coordination
(Assembly Bill [AB] 52 and Senate Bill [SB] 18)
f Biological Resources Surveys/Assessments and
Monitoring
f Regulatory Permitting and Jurisdictional
Delineations
f Habitat Restoration/Mitigation Planning and
Monitoring
f GIS Services
Psomas’ goal is to establish long-lasting, positive, and productive working relationships with our clients.

In an effort to best serve the needs of our clients, we strive to consistently deliver quality work products
within each project’s schedule and cost constraints.

Our project management style is rooted in our
commitment to provide accurate and comprehensive
consulting services; timely and cost-effective reports
4Client Name | Project NamePage 984 of 1311

5City of Beaumont
On-Call Planning and Environmental Services
NEPA Documentation
f Categorical Exclusions (CEs)
f Environmental Assessments (EAs)
f Findings of No Significant Impact (FONSIs)
f Environmental Impact Statements (EISs)
f Socioeconomics Analysis
f Environmental Justice Analysis California
Department of Transportation (Caltrans)
Documentation
f Preliminary Environmental Analysis Reports
(PEARs)
f Preliminary Environmental Studies (PESs)
f Joint Documentation (EIR/EIS; IS/EA) pursuant
to Caltrans Standard Environmental Reference
(SER) Additional Documentation Services
f Constraints Analyses
f Peer Reviews
f Mitigation Monitoring and Reporting
Plans/Programs (MMRPs) Preparation and
Construction Compliance
f Findings of Fact and Statement of Overriding
Consideration
Project Management Services
Psomas provides a wide range of project management
services to supplement our clients’ staff resources.

Our senior staff members will assist the City
by facilitating and managing projects, offering
entitlement strategies, and assisting in issue
resolution. Project management services include:
f Scoping and Community Meetings/Public
Hearings
f Agency Coordination
f Project Processing Strategies
f Project Strategy and Management
f CEQA/NEPA Legislation/Regulation, Case Law
and Guidance
Air Quality, Greenhouse Gas Emissions, Noise
and Vibration Services
f CEQA/NEPA Air Quality and Greenhouse Gas
(GHG) Analyses and Technical Reports
f Air Quality Dispersion Modeling (CALINE,
ISCST3, AERMOD)
f Air Quality Emissions Calculations (CalEEMod,
EMFAC, OFFROAD, AP-42)
f Health Risk Assessments
f Peer Review of Technical Analyses Noise and
Vibration Analysis
f CEQA/NEPA Noise and Vibration Analyses and
Technical Reports
f 3D Noise Modeling (SoundPlan)
f Noise Ordinance Assessment
f Ambient and Construction Noise Monitoring
f Traffic, Rail, and Stationary Source Noise and
Vibration Modeling
f FHWA/Caltrans Noise Analyses and Technical
Reports
f Peer Review of Technical Analyses
Cultural Resources: Archaeology,
Paleontology, and Tribal Cultural Services
f CEQA, NEPA, and NHPA Section 106 Compliance
Analyses
f Federal, State, and Local Agency Consultation
and Interagency and Departmental
Coordination
f Phase I Records Search and Survey Reports
f Phase II Resource Evaluation Studies and Reports
f Phase III Data Recovery Mitigation Studies and
Reports
f Phase IV Monitoring Mitigation Studies and
Reports
f Paleontological Resources Assessments
f Caltrans Documentation
„Archaeological Survey Reports (ASRs)
„Extended Phase I Reports (XPIs)
„Paleontological Identification Reports (PIRs)
5Client Name | Project NamePage 985 of 1311

6City of Beaumont
On-Call Planning and Environmental Services
„Paleontological Evaluation Reports (PERs)
f Paleontological Mitigation Plans (PMPs)
f Completion of State Department of Parks and
Recreation (DPRs) 523 Resource Record Forms
f Native American Scoping and Consultation
(AB 52 and SB 18)
f Construction Monitoring and Salvage
Biological Resources Analysis and Regulatory
Permitting
f CEQA/NEPA Biological Resources Analyses and
Technical Reports
f Literature Reviews
f Regulatory Compliance Expertise
f Special Status Species Survey Expertise,
Analyses, Documentation, and Implementation
Services
f Arborist Reports and Tree Surveys; Vegetation
and Wildlife Surveys; Special Status Species
Surveys
f Resource Agency Permit Processing and
Coordination
„Regional Water Quality Control Board
(RWQCB) Section 401 Water Quality
Certification
„U.S. Army Corps of Engineers (USACE)
Section 404 Permits
„California Department of Fish and Wildlife
(CDFW) Section 1600 Streambed Alteration
Agreement
„California Coastal Commission (CCC)
f Regulatory Documentation
f Habitat Resource Management Planning/
Implementation Expertise
f Landscape Management/Habitat Restoration,
Mitigation Implementation and Maintenance
f Construction Support
GIS Mapping and Spatial Analyses
f Map Production
f Database Design
f Data Conversion and Integration
f GPS Surveys
f Spatial Analyses
f Mapping 3D Analyses
f Shade and Shadow Modeling
f Impact Assessments
f Geocoding
f Graphic Design Services
f Visual Simulations
Additional In-House Services
Additional services available at Psomas that can
support the preparation of environmental documents
pursuant to CEQA and NEPA are listed below. These
in-house capabilities and technical specialties
underscore our capacity to provide the full range of
services as needed during project execution.

Water/Wastewater Engineering
f Water Supply Assessments (WSA) and
Verifications
f Water, Sewer, and Recycled Water
Infrastructure Plans and Studies
f Surface Water Studies
f Water Quality Monitoring Plans
f Water Quality Assessment Report/Low Impact
Development (LID) Report
f Water Quality Monitoring and Treatment
f National Pollutant Discharge Elimination
System (NPDES) Permitting
f Impact Analyses
f Construction Storm Water Pollution Prevention
Plans (SWPPPs)
f Best Management Practices (BMPs)
f Water Quality Management Plans (WQMPs)
f Alternative Water Supply Analyses
f Water and Sewer Systems Design
f Bridge Design
f Hydrology and Hydraulics Analyses
6Client Name | Project NamePage 986 of 1311

7City of Beaumont
On-Call Planning and Environmental Services
Civil Engineering/Site Development
f Land Planning and Urban Design
f Land Use Entitlement
f Subdivision Design
f Sustainable Site Design
f 3D (BIM) Site Design and Modeling
f Utilities Planning and Design
f Grading, Drainage and Flood Control
f Hydrology
f Hydraulic Assessments
f Street and Highway Design
f Water and Sewer Systems Design
f Retaining and Sound Wall Design
Transportation/Traffic and Parking Analysis
f Vehicle Miles Traveled Analyses
f Traffic Impact and Parking Studies
f Transit-Oriented Development (TOD) Planning
Studies
f Regional Transportation Studies
f Street Improvement Design and Engineering
f Signal Warrants and Timing Studies
f Road Safety Analysis
f Traffic Engineering Design
f Pavement Markings and Signing Plans
f Traffic Control and Sequencing Plans
How Psomas Meets Scope of
Services Objectives
Our proposed Project Manager, Charles Holcombe
III, will function as an integral City staff member
through regular coordination and communication
with appropriate City staff. Charles understands
his job will be to identify and process CEQA/NEPA
compliance documents for a variety of private
development applications and City-sponsored actions
in a timely and cost-efficient manner. Charles has
worked well with the City in the past, successfully
preparing and revising an IS/MND for the Brookside
South Recharge Project, as well as managing the
Beaumont Industrial Park EIR and Crossroads
Industrial Park Complex Addendum.

He will evaluate applications and work closely
with staff to clearly describe the proposed project
so the most appropriate CEQA compliance process
and document can be selected, whether that be
an exemption, MND, or EIR. He will prepare or
review the necessary evaluation materials quickly
and efficiently to help expedite the planning and
environmental processes for each specific project.

Charles will coordinate and meet with other City
staff as needed to process projects and City projects.

He will also help identify potential issues or possible project changes or mitigation as needed to prevent
unnecessary delays and additional costs. Charles is
located in our Riverside office and will be responsive
to the needs of the City on projects needing CEQA or
NEPA compliance.

He can take advantage of the full range of
environmental services offered by Psomas to
provide any needed technical support that private
or public projects in the City may require, especially
regarding air quality, greenhouse gas, energy, noise,
biological resources, vehicle miles traveled, traffic,
cultural resources, or tribal cultural resources. He
has 17 years of experience in both the public and
private sectors and understands the importance
of maintaining budgets and schedules on multiple
projects being processed at the same time. Charles
has managed the preparation and processing of more
than a dozen projects simultaneously, including
regulatory permitting and resolving difficult inter-
agency environmental issues. Charles will become
your “go to” CEQA/NEPA compliance person and
provide effective and efficient environmental services
and will meet or exceed all your expectations in this
regard.

Subconsultants
Psomas maintains excellent working relationships
with numerous subconsultants and we contract only
with companies that have proven track records for
providing high quality work products in a timely and
cost-efficient manner. Psomas will be supported by
experienced subconsultants when their expertise
7Client Name | Project NamePage 987 of 1311

8City of Beaumont
On-Call Planning and Environmental Services
is determined necessary to meet specific technical
requirements of an on-call project, and will be
approved by the City prior to signing project specific
agreements. Charles will oversee the quality and
schedule of the technical reports prepared by each of
our trusted teaming partners listed below, and also
confirm the efficient transfer of information between
the City, applicant, and appropriate subconsultant for
each of the environmental reports.

Technical areas in which Psomas proposes to use
subconsultants include, but are not limited to:
f Geological/Geotechnical and Phase I ESA
(Hazards) Services (Sladden Engineering)
f Traffic/Transportation (Urban Crossroads will
be utilized when an engineer with specific
experience/knowledge would facilitate the
successful completion of the project)
Sladden Engineering, Inc.

Geological/Geotechnical and Phase I ESA
(Hazards) Services
Sladden Engineering is a geotechnical engineering
and geological consulting firm initially founded in
1959. Sladden Engineering has a long history as a
highly respected geotechnical consulting firm that
has been involved with thousands of successful
projects throughout Southern California.

Sladden Engineering’s experience includes all types of
development and construction performed in Southern
California. The firm has provided geotechnical
engineering, geologic, and material testing services
on residential, commercial and industrial projects,
municipal facilities and the infrastructures
associated with these projects. From preliminary
geotechnical and geological studies through
construction inspection, Sladden Engineering
provides a team of experienced professional and
technical personnel. Their project experience includes
numerous prominent clients and recognizable
facilities.

Sladden Engineering's in-house geotechnical and
construction materials testing laboratory offers
comprehensive testing services that enable their firm
to provide timely and accurate test results.

Urban Crossroads, Inc.

Traffic/Transportation Engineering
Founded in 2000, Urban Crossroads, Inc., is a
California “S” Corporation and certified Small
Business (SBE #48585) and a leading provider of
traffic, air, and noise consulting services. They serve both public and private sector clients to provide
forecasting, analysis, and design for all modes of
transportation. At Urban Crossroads, they recognize
the importance of delivering a timely work product
that satisfies the regulatory requirements while
communicating with their clients throughout the
process.

Urban Crossroads provides a full range of traffic
services that include traffic impact analysis, traffic
engineering, travel demand modeling, simulations,
and many other traffic related services. In addition
to these services, they actively maintain their
expertise with the latest analytical tools, travel
demand models, intersection level of service analysis
methodologies, and traffic simulation.

PRIMARY OFFICE LOCATION
20341 SW Birch Street
Suite 230
Newport Beach, CA 92660

PRIMARY OFFICE LOCATION
450 Egan Avenue
Beaumont, CA 92223
8Client Name | Project NamePage 988 of 1311

9City of Beaumont
On-Call Planning and Environmental Services

C FIRM APPROACH
Scope of Work Approach
The environmental documentation requirements
and the type of CEQA document determined to be
appropriate for a project can vary extensively. It
is recognized the City anticipates future projects
to be undertaken by the pre-qualified on-call
Environmental Consultants may primarily
necessitate preparation of a Negative Declaration/
Mitigated Negative Declaration (ND/MND) or
Environmental Impact Report (EIR), and this is
probable. However, infill redevelopment, small-scale
open space projects, additions and renovations,
and other types of development that may occur in
Beaumont's future may qualify for review using
an alternate form of CEQA documentation, such
as a Categorical Exemption (CE), streamlined ND/
MND review pursuant to Section 15183.3 of the
CEQA Guidelines, or a Sustainable Communities
Environmental Assessment (SCEA).

Upon receiving the City’s Request for Proposal (RFP),
Psomas will prepare a detailed Scope of Work (SOW)
that is responsive to the requirements of the RFP,
project-specific issues, identified concerns, and
required technical analysis. Because all projects are
unique, Psomas will consider the most appropriate
and efficient environmental review process for each
proposal. In light of the type of project and level of
analysis, the SOW will propose a cost estimate that
breaks down the fee by task, with clear demarcation
between anticipated professional and direct fees.

The SOW will be accompanied by a detailed timeline
highlighting milestones and deliverables, consistent
with the proposed SOW.

Clear expectations for level of effort, deliverables
and adherence to schedule and budget are inherent
criteria in excellent client service. Regardless of
the type and size of a project, Psomas believes in a
holistic approach toward project management and
client satisfaction, while meeting the requirements of
the technical scope of services.

Developing and maintaining a collaborative client
relationship is a component of this approach.

Psomas is committed to fostering trust-based client
relationships that will last well beyond any single
project. Building upon the notion of this relationship
includes establishing a line of communication that
facilitates data sharing, project information updates,
and schedule and cost maintenance. We will rely on
the expertise and knowledge of City staff as much
as they will rely on our capabilities in managing the
environmental documentation process.

Additionally, and more specifically, we embrace the
following steps in our process:
f Establish a communication protocol with City
staff, technical leads including subconsultants
and other key team members to ensure
project-critical information is efficiently and
accurately conveyed across the team
f Ensure roles/responsibilities are clear for
efficient management of assignments and
quality control of services and deliverables
f Utilize experienced staff with extensive
relevant experience who will do the job right
the first time
f Agree on initial project schedule and budget
with City staff and a protocol for updating
status on both during all project phases
f Determine key project description details
with the City early to facilitate accurate and
consistent peer reviews and EIR analyses
f Verify that technical approach/scope of
services as conveyed in the proposal still meet
City expectations following completion of
project description
f Collaborate up front with the City on standard
templates for project deliverables, including
peer review technical memoranda and CEQA
document components
9Client Name | Project NamePage 989 of 1311

10City of Beaumont
On-Call Planning and Environmental Services
Psomas’ in-house Quality Assurance/Quality Control
(QA/QC) process will confirm that all deliverables
are accurate and legally defensible. Psomas’ QA/QC
process for each documentation is described in more
detail on the following page.

Project Controls
Psomas has espoused methods and approaches in its
preparation and delivery of environmental documents
and supporting technical studies to verify project
deadlines are met and the process is completed within
budget.

Scope of Work (SOW). The SOW for most projects
influences the budget and schedule. Upon project
kick-off, the SOW will be further discussed with
the City of Beaumont (City) and better defined. As
the SOW will direct the action items for all tasks
proposed, it is imperative that it be kept updated and
any changes in approach and direction be reflected
in the SOW. The SOW will be communicated with
the City at regular intervals to facilitate solutions to potential issues, as applicable, before they become
impediments to completing the proposed project.

Schedule. An agreed-upon master schedule will be
used to monitor progress on key milestones and
deliverables. The schedule will be updated, as needed,
and distributed to the project team. Additionally,
in order to maintain the project schedule, we have
established workload management systems to assist
in the meeting project schedule. The mechanisms in
place, the diligence of our Project Manager, and access to a deep bench of environmental experts will keep
the proposed project on schedule.

Budget. The budget is another key component that
will be closely monitored and controlled by the Project Manager. Assigned hours and costs for each task will
be communicated with the Psomas team to maintain
that hours allocated for those tasks are aligned with
performance. The Project Manager has real-time
information regarding total authorized budget, costs
expended to date, current expenditures, and the
remaining balance. Access to accurate, complete data
will allow our Project Manager to alert the City to
potential budget implications if issues arise.

Status Reports. Each of these items will be regularly
reviewed and communicated to City staff. The
method of communicating project status will be
established during project initiation and will be
dependent on the City staff preferences. As a regular
course of business, Psomas maintains some level
of communication on a weekly basis for all active
projects and may communicate via conference call
or in-person meeting, or via email with an itemized
update on the status for all deliverables, a budget
overview, and review of the project schedule.

Implementation Strategies
Best Practices
The environmental documentation needs of every
project are unique and depend on the type and
size of the project, existing conditions, potential
impacts, and public controversy, among other
factors. However, regardless of the type and size of
projects, best practices espoused by our project team
will facilitate the environmental process on future
projects.

Technical Solutions. One of the strengths of the
Psomas team is taking the time in the beginning of
the project to develop a thorough project description
that correctly reflects details of project construction and operation. Upon completion and approval by
the City, the project description will be shared with
the Psomas technical leads and subconsultants, as
applicable. Based on our experience, a solid and stable project description can serve to avoid later revisions
We meet our clients’ needs by providing timely and technically sound documentation that complies with regulatory and planning agency requirements. 10Client Name | Project NamePage 990 of 1311

11City of Beaumont
On-Call Planning and Environmental Services
to the environmental document analyses
and related technical studies.

Additionally, the Project Manager
will closely monitor the
content of technical studies/
analyses to keep the City
apprised of the progress
and any issues that
may arise. If potential
constraints and impacts
are identified, Psomas
will alert the City to avoid
impacts and required
mitigation, whenever
feasible.

Furthermore, one of the key
roles of the Project Manager and
Principal-in-Charge will be to provide
ongoing guidance and strategic consultation to the
City regarding new regulations affecting proposed
projects. Problem-solving and creative discussions
help to streamline the process for the environmental
documents.

In-House Quality Assurance/Quality Control
(QA/QC). Psomas is committed to providing high
quality technical documents that engender client
satisfaction, meet the needs of the project, and
withstand legal scrutiny. Therefore, conducting
in-house QA/QC reviews concurrent with the
preparation of written technical
documents is a critical part of
our delivery of technically
sound and legally defensible
environmental documents.

In fact, Psomas has a
company-wide quality
assurance/quality control
committee that is called
“Pride in Performance”
with the goal of
maintaining the culture
of “quality” throughout the
firm.

Our QA/QC process begins
with the assignment of staff
members with the appropriate
technical expertise and experience.

All work products are prepared with the
oversight and review of an assigned technical lead.

Upon completion of the first internal draft, it is
reviewed by the Project Manager for consistency
with the project description, compliance with our
approved scope of work, and technical accuracy.

Upon revisions, it is sent to our in-house technical
editor for review of grammar, proper nomenclature,
references, and methodological consistency. The last
step is a thorough and complete word processing
review. Only then is the document submitted to the
City for review.

Qualified
Staff
Project
Work Plan
Assignments
of Tasks
Adherence
to Standards
Tracking and
Documentation

MONITORING/REVIEWTRAINING
ORIENTATION11Client Name | Project NamePage 991 of 1311

12City of Beaumont
On-Call Planning and Environmental Services

D FIRM PROFILE
Firm Organization
Founded in 1946, Psomas has been in business 77 years and is operating as a California corporation (C0705477).

Dedicated to balancing the natural and built environment, Psomas serves public and private clients in the site development, transportation, water, and energy markets with the following core services offered:
f Environmental planning and resource
management
f Civil engineering
f Water and wastewater engineering
f Transportation and traffic engineering
f Land planning and urban design
f Land use entitlements
f Survey and geospatial services including use of
drones, 3D laser scanning and subsurface utility
locating
f Site development engineering
f Structural engineering
f Construction management
f GIS consulting
Psomas has 15 offices located in California, Arizona, Washington, and Utah. We currently employ a staff of over 740 employees with 44 professionals assigned to the Environmental Group in Southern California.

Office locations:
f Auburn, CA (24)
f Culver City, CA (14)
f Los Angeles, CA (95)
f Santa Ana, CA (165)
f Pasadena, CA (22)
f Riverside, CA (26)
f Roseville, CA (109)
f Salt Lake City, UT (42)
f San Diego, CA (30)
f Seattle, WA (62)
f Tacoma, WA (43)
f Tuscon, AZ (51)
f Valencia, CA (16)
f Walnut Creek, CA (39)
f Wenatchee, WA (5)
OFFICES15
100%
EMPLOYEE OWNED 100+77YEARS

EXPERIENCE

CERTIFIED

SUSTAINABILITY
Professionals
ENV SP + LEED Credentialed

TOP DESIGN FIRMS
No.

No.

Psomas is No. 15
Overall
Psomas is No. 1 in
Surveying
& Mapping
12Client Name | Project NamePage 992 of 1311

13City of Beaumont
On-Call Planning and Environmental Services

E PRINCIPAL OFFICE LOCATION
The following office locations will be responsible for the implementation of this contract. f Riverside | 1650 Spruce Street, Suite 400, Riverside, CA 92507 f Santa Ana | 5 Hutton Centre Drive, Suite 300, Santa Ana, CA 92707 f Pasadena | 225 South Lake Avenue, Suite 1000, Pasadena, CA 91101 f Los Angeles | 555 South Flower Street, Suite 4300, Los Angeles, CA 90071 The primary office which will serve the City for this contract will be our Riverside location. Additional Psomas offices that may be used to assist in the preparation of environmental documents are Santa Ana, Los Angeles, and Pasadena.

All offices work seamlessly together as a team, and frequently travel to different offices for project needs.

Notably, Charles Holcombe III, the assigned Project Manager for this contract, maintains an office in Riverside and is available to visit the City for meetings, as necessary.

We work as a team, through collaboration and brainstorming sessions, toward the common goal of providing the best projects for our clients. 13Client Name | Project NamePage 993 of 1311

14City of Beaumont
On-Call Planning and Environmental Services

F PROPOSED TEAM

CITY OF BEAUMONT

COMMUNITY DEVELOPMENT

DEPARTMENT
Jennifer Marks
PSOMAS

PRINCIPAL-IN-CHARGE/

QA/QC MANAGER
Charles Holcombe III, MBA
PSOMAS

PROJECT MANAGER
Sean Noonan, AICP
Jordan Werkmeister
PSOMAS

CEQA/NEPA

DOCUMENTATION
Tin Cheung
PSOMAS

AIR QUALITY/CLIMATE

CHANGE/GHG/NOISE
Charles Cisneros, MS, RPA
Brianna House
PSOMAS

CULTURAL/TRIBAL

CULTURAL RESOURCES
Amber Heredia
PSOMAS

BIOLOGICAL

RESOURCES
Darlene Yellowhair,
PE, TE, PTOE, RSP2i, ENV SP
PSOMAS
Charlene So, TE

URBAN CROSSROADS

TRANSPORTATION/

TRAFFIC
David Brotchie,

PE, QSD, LEED AP
PSOMAS

HYDROLOGY/WATER

QUALITY
Matthew Cohrt, PG, CEG

SLADDEN ENGINEERING

GEOLOGY AND SOILS/

HAZARDS
Project Management Team
Much of the responsibility for the success of the CEQA
process depends on the Project Manager’s ability
to engender the confidence of the Lead Agency by
providing consistently dependable, accurate, and
responsive client service. In order to meet the needs
and expectations of the City, Psomas has assembled a
qualified project team that can prepare the requested
CEQA and/or NEPA documentation within the
identified budget and schedule.

Organization Chart
While each of the key staff members will have other
project responsibilities, we work hard to ensure that
our client’s project schedules are met. Therefore, each team member will have adequate availability to meet
upcoming project requirements. We are careful not
to commit 100% of any staff member’s time, thereby
ensuring availability of qualified staff.

The organization chart presented below identifies
our project team and lines of communication on this
contract. We have also included Sladden Engineering
and Urban Crossroads as subconsultants on our
team to provide their specialized expertise when
needed for a particular assignment. The table on
the following page provides a description of each
team member’s role, availability, relevant experience
and qualifications. Detailed resumes for each team
member are provided in the Appendix beginning on
page A-1.

The Psomas team members listed on the organization
chart will be available for the duration of the
City’s on-call contract. With a staff of over 40
environmental/resource management professionals,
we can assign additional staff as needed on projects
per the City’s approval of their qualifications.

ENVIRONMENTAL SUPPORT
14Client Name | Project NamePage 994 of 1311

15City of Beaumont
On-Call Planning and Environmental Services
Personnel Responsibility and Experience Table
Proposed team members are shown in the table below and each of their resumes are located in the Appendix Section, highlighting their individual qualifications including years of experience, relevant experience, and certification/permits for this on-call contract.

Key Personnel/Role Responsibility Similar Past Experience Psomas
Jennifer Marks
Principal-in-Charge
f Contract management
f Coordinate with the Project Manager to
ensure projects are on schedule and within
budget
f QA/QC review of environmental documents
f Proven Group Manager for CEQA/
NEPA compliance
f Experience with both public and
private projects
Charles Holcombe III,
MBA
Project Manager/Primary Contact
f Primary contact for City for this contract
f Preparation and management of the scope of
work, fee estimate, and schedule on projects
f Preparation of environmental documents
and/or technical analyses
f Day-to-day project management and regular
coordination with the City
f Day-to-day coordination for preparation of
the environmental documents
f Attend and facilitate team and public
meetings and make presentations, as needed
f Proven Senior CEQA/NEPA Project
Manager
f Extensive experience in the Inland
Empire, including the City of
Beaumont
f Wide range of project types and
sizes, both public and private
Sean Noonan, AICP
Environmental Planner
f Conduct research for and prepare
environmental documents and/or technical
analyses under the supervision of the Project
Manager
f Site visits to document existing conditions
f Assist in the management of Project Teams
f Experience with both private and
public projects
f Worked on small and large projects
in the Inland Empire
f Has found creative solutions to
environmental issues
Jordan Werkmeister
Environmental Planner
f Conduct research for and prepare
environmental documents and/or technical
analyses under the supervision of the Project
Manager
f Assist in preparation of air quality and
greenhouse gas analyses
f Strong team player and support for
CEQA documentation
f Worked on a variety of projects in
Southern California
Tin Chueng
Air Quality/Climate Change/GHG/Noise Manager
f Oversee and/or prepare the air quality, GHG
emissions, health risk assessment, noise and
vibration analysis
f Conduct and/or oversee air quality, GHG,
health risk, and noise modeling eff orts
f Coordinate noise monitoring
f Managed a wide range of air quality,
GHG, and noise projects
f Worked on both public and private
projects throughout Southern
California
f Familiar with modeling
requirements of local and regional
agencies
Charles Cisneros, MS,
RPA
Senior Archaeologist
f Oversee and/or prepare the cultural
resources analyses (historic, archaeological,
tribal cultural resources and paleontological
resources), including Section 106 analyses, if
needed
f Assist the City in Native American
coordination, if required, including required
coordination and project notification
pursuant to AB 52
f Certified Archaeologist familiar with
resources and tribes in Southern
California
f Experienced with CEQA and NEPA
level assessments
f Experience coordinating with Native
American tribal representatives
15Client Name | Project NamePage 995 of 1311

16City of Beaumont
On-Call Planning and Environmental Services
Key Personnel/Role Responsibility Similar Past Experience Psomas
Brianna House
Paleontologist
f Conduct paleontological surveys, if needed
f Prepare paleontological resources analyses
f Experience preparing
paleontological assessments
Amber Heredia
Biological Resources Manager
f Conduct or oversee biological surveys and
nesting bird surveys, if needed
f Prepare or provide QA/QC for biological
resources analyses
f Advise the team on strategies to reduce or
avoid impacts to biological resources
f Performed surveys in Southern
California for southwestern willow
flycatcher, coastal California
gnatcatcher, least Bell’s vireo,
burrowing owl
f Completed numerous biological
assessments consistent with County
MSHCP requirements
Darlene Yellowhair,

PE, TE, PTOE, ENV SP,

LEED AP
Traffic/Transportation Engineer
f Coordination with City and other agencies
regarding the traffic impact analysis, as
appropriate and as directed by the City
f Conduct traffic impact analysis and
associated modeling
f Conduct parking analyses, if needed
f Licensed Traffic Engineer
f Extensive experience with traffic
engineering projects
f Worked with both public and
private clients
f Completed traffic safety, signal
warrant, and corridor studies
David Brotchie, PE,

QSD, LEED AP
Hydrology and Water Quality Engineer
f Prepare grading and drainage plans as well
as water quality technical analyses
f Provide water resources management,
facilities master plans, groundwater
modeling, contaminant transport modeling,
and hydrologic and hydraulic modeling and
analysis
f Professional Civil Engineer
f Project experience includes design
and development of roadways,
commercial projects, master
planning of residential subdivisions,
stormwater management, and flood
control
f Hydrology and hydraulic experience
has focused on civil works
infrastructure projects including
levee, floodwall design, and
drainage master plans and studies
Subconsultants
Matthew Cohrt, PG,
CEG
Sladden Engineering
Geologist/Hazardous Materials Engineer
f Conduct Phase I ESA Assessments
f Perform geologic site evaluations including
borehole logging and sampling, geologic
mapping, fault and seismic studies
f Coordinate and perform geologic studies
including related research and investigation
of potential geologic hazards
f Licensed Professional Geologist
f Projects include residential
developments and various
commercial and industrial
developments, which involved
seismicity evaluation, exploratory
trenching and fault studies, slope
stability evaluation, geologic
mapping, rolling boulder and or
rock fall hazard evaluations, ground
subsidence studies, laboratory
testing and computer analyses
Charlene So, PE
Urban Crossroads
Traffic/Transportation Engineer
f Coordination with City and other agencies
regarding the traffic impact analysis, as
appropriate and as directed by the City
f Conduct traffic impact analysis and
associated modeling
f Conduct parking analyses, if needed
f Licensed Traffic Engineer
f Expert in transportation planning
and traffic impact analyses
f Has completed a variety of traffic
studies throughout Southern
California
f Experienced project manager/traffic
engineer familiar with the analysis
techniques of the most current
Highway Capacity Manual
Personnel Responsibility and Experience Table (Continued) 16Client Name | Project NamePage 996 of 1311

17City of Beaumont
On-Call Planning and Environmental Services

G REFERENCES
1 City of Arcadia
240 West Huntington Drive
Arcadia, CA 91066
Lisa L. Flores
Planning and Community
Development Administrator
626.574.5445
[email protected]
On-Call Environmental Consulting Services, Arcadia, CA: Psomas was awarded a three-year contract by the City of Arcadia to provide on-call environmental services from 2018 to 2021, with the first of the optional one-year extensions granted in 2022. Representative task orders to both the Planning and Community Development Department and Public Works Department as part of the on-call contract to date have included:

Arcadia Bicycle Facility Improvements #2; Huntington Plaza Mixed-Use Development; Huntington Parkview Mixed-Use Development; City Center Design Plan; Categorical Exemptions; and Nesting Bird Surveys. (Services provided: 2018 to Present)
2018 Educational and Facilities Master Plan (EFMP) EIR, Walnut, CA:

Psomas prepared an EIR for the implementation of the Mt. SAC 2018 EFMP.

The project involved implementation of the 2018 EFMP, which serves as Mt. SAC’s long-range development plan over a 10-year horizon period. In addition to the EIR, Psomas also prepared technical analyses to support the EIR, including air quality, biological resources, cultural and tribal resources, greenhouse gas emissions, hydrology and water quality, and traffic analyses. (Services provided: 3/2018 to 8/2020)
Technology and Health Building IS/MND, Walnut, CA: Psomas prepared an IS/MND for this project which involves construction of a new four-story Technology and Health building north of Temple Avenue and west of Bonita Drive on the Mt. SAC campus in the City of Walnut. In addition to the IS/MND, Psomas also prepared technical studies/analyses in support of the Project EIR, including air quality, greenhouse gas emissions, noise,and traffic studies/analyses. (Services provided: 1/2021 to 12/2021) Mt. San Antonio College
1100 North Grand Avenue
Walnut, CA 91789
Gary Nellesen
Director, Facilities Planning and
Management
909.274.5176
[email protected]
2 PSOMAS ENVIRONMENTAL GROUP PROJECT EXPERIENCE
Psomas has extensive experience providing environmental services for General Plans and Specific Plans for commercial/retail centers; master planned communities; residential communities; parks, golf courses, and recreational facilities; urban infill, mixed-use, and transit-oriented development projects. Projects provided in this section showcase our expertise with a variety of environmental documents successfully completed within the last three years and ongoing that demonstrate our ability to successfully navigate the CEQA process. We have included references for projects that our Principal-in-Charge, Jennifer Marks, is leading for Psomas, as well as those for projects led by Charles Holcomble who will serve as our Project Manager and primary contact. 3 City of Long Beach
Development Services, Planning
411 W. Ocean Boulevard
Long Beach, CA 90802
Amy Harbin, AICP
Planner
562.570.6872
[email protected]
Pacific Place EIR, Long Beach, CA: Psomas is currently preparing an EIR for the Pacific Place Project, located on approximately 14 acres at the north ends of Pacific Place and Ambeco Road in Long Beach. The project involves development of a three-story self-storage building. The building would be 40 feet tall and include interior and exterior accessible storage units. The project would also include development of recreational vehicle storage, including 405 surface pull-through spaces and 173 covered pull-in spaces.

A waste disposal station and self-serve car wash would be included as part of the recreational vehicle storage facility. As part of the construction, an engineered cap would be designed and constructed to cover the entire project site to address known contamination related to the site’s historic use as an oil brine water treatment facility and oil wells. The EIR contains a full account of historic contamination, site assessments, remediation plans, and response actions, which are addressed through a mitigation measure requiring Department of Toxic Substances Control approval. The EIR is also focusing on potential air quality and traffic access impacts related to truck and RV trips. (Services provided: 2020 to Present)
17Client Name | Project NamePage 997 of 1311

18City of Beaumont
On-Call Planning and Environmental Services
4 City of Norco
2870 Clark Avenue
Norco, CA 92860
Alma Robles
Planning Director
951.270.5662
[email protected]
Norco Valley Square EIR, City of Norco, CA: The proposed project would result in a mix of multi-family residential units, indoor/outdoor commercial food services with performance stage, and hotel development. The residential portion of the project will be constructed on approximately

11.26 acres on the west portion of the project site and includes 320 one-, two- and three-bedroom units configured into 20 three-story buildings.

The project is planned for approximately 280,000 SF of net rentable square footage, resulting in a density of approximately 29 dwelling units per acre. An approximately 6,000 SF single-story recreation center with offices, meeting rooms, and fitness uses, including a pool and spa, are planned near the project entry. There are 196 single car garages and 380 surface spaces, plus 256 open spaces on the residential property (total of 576 spaces dedicated to residential use). In addition, 64 overflow parking stalls will be shared with commercial food services. The commercial food services and ancillary uses are located on approximately 3.60 acres on the northeast portion of the project site and include a 8,700 SF commercial food service building and other uses such as enhanced community gathering spaces. A total of 50 parking spaces are reserved exclusively for the food area, with another 64 parking spaces shared with residential use.

The hotel is located on approximately 3.56 acres in the southeast portion of the project site and consists of a 128-key, four-story building with 133 parking spaces. (Services provided: 9/2020 to 9/2021)

PROJECT MANAGER PROJECT EXPERIENCE
We have provided additional project references for Charles in Section J: Additional Information that do not meet the timeframe requirements for this section but are local projects relevant to the scope of work. 18Client Name | Project NamePage 998 of 1311

19City of Beaumont
On-Call Planning and Environmental Services

H SCOPE OF SERVICES
Planning and Environmental
Services Approach
In accordance with the City’s request, Psomas, with our understanding of the vision, environment, and priorities of the City, is proposing to provide On-Call Planning
and Environmental Services, including CEQA and
NEPA documentation, technical study preparation, and
permitting to the City of Beaumont. Our staff’s experience ranges from small infill development/redevelopment
projects that may require Categorical Exemptions (CEs), Categorical Exclusions (CEs) or Addendum documents, to
mid-size projects that require Negative Declarations (NDs), Mitigated Negative Declarations (MNDs), Environmental
Assessments (EAs), and Findings of No Significant Impact (FONSIs), to large-scale projects that require Environmental Impact Reports (EIRs), or Environmental Impact Statements (EISs). Our depth of experience in various types of environmental documents and geographies provides us with a range of knowledge and expertise that will apply to a variety of projects in the City.

Additionally, if requested, Psomas’ specialists will prepare technical studies for Air Quality, Energy, Greenhouse Gas Emissions, Noise, and Transportation, in addition to Biological Resources and Regulatory Permitting, Cultural Resources, Tribal Cultural Resources, Hydrology, and Water Quality, as deemed necessary.

However, if technical studies are prepared by the future applicants’ consultants, Psomas can perform peer reviews of such studies and prepare memoranda summarizing the findings of the peer reviews.

Psomas understands the City will notify the selected consultants of future projects, at which time Psomas and other consultants will submit work plans, cost estimates, and schedules to the City. Upon being selected by the City for preparation of an environmental document for a future project, Psomas will initiate the process by meeting with the City and project team to define the project and coordinate on the technical approach. Subsequently, the Psomas Team will conduct research and gather data; prepare technical studies, as necessary; or peer review the technical studies prepared by the applicant’s consultants. Upon completion of the technical studies or peer review of the applicant-provided technical studies, Psomas will prepare administrative or screencheck drafts of the environmental document and a final draft for review and approval by the City prior to distribution for public review. Upon receipt of comments from the public, Psomas will prepare draft and final responses to comments and final document for review and approval by the City prior to distribution to the commenters and the decision makers. Additionally, Psomas will attend study sessions, Planning Commission, and City Council hearings. Psomas will also be responsible for preparing all the notices required for that particular type of environmental document.
19Client Name | Project NamePage 999 of 1311

20City of Beaumont
On-Call Planning and Environmental Services
Psomas will provide quality control for each draft of the document. Our in-house quality assurance/quality control process will confirm that all deliverables are accurate and legally defensible.

Furthermore, while it is assumed the City will identify the appropriate CEQA document for future projects, if requested by the City, Psomas can assist with that effort. The potential need for NEPA documentation will also be assessed and discussed with the City and required federal agency permitting identified.

Specific Approach
Kick-Off Meeting
Upon being selected by the City for a future project, the Psomas Project Manager will meet with the City to initiate the assigned project. The kick-off meeting will provide an opportunity to discuss and/or confirm the approach to the CEQA or NEPA document and environmental process; discuss the technical analyses/ studies; and identify the key community issues/concerns. Additionally, the project schedule will be discussed, and a communication protocol established. Psomas will identify information needs and prepare a data needs request.

The project initiation task will also include conducting a site visit, data collection, and preparing a project description.

Draft Initial Study and Required Technical Studies
Psomas routinely prepares Initial Studies (ISs) to determine the appropriate environmental documentation. Upon a project kick-off meeting, Psomas will prepare an IS in accordance with the State CEQA Guidelines (California Code of Regulations (CCR), Title 14, Chapter 3, Sections 15000, et seq.) to determine the appropriate CEQA documentation for a project. All topical issues will be evaluated in the IS, and all conclusions will be substantiated by technical information.

Psomas’ technical experts will prepare technical analyses, including air quality, energy, greenhouse gas emissions, noise, transportation, hydrology/drainage, and Water Quality Management Plan (WQMP). For certain technical disciplines such as geology and soils, hazards materials, and historic resources, Psomas will engage experts/firms within the industry who have worked extensively with Psomas.

If technical studies are prepared by the applicant’s consultants, Psomas’ technical experts will conduct peer reviews of those studies for technical adequacy and compliance with CEQA requirements.

Draft Environmental Document
Psomas recognizes that future City projects, depending on their types, size, and issues of concern, may require any type of CEQA or NEPA document. As indicated above, upon completion of the analysis in the IS and conclusions of the technical studies, the City and Psomas will determine the appropriate type of CEQA document for the project, unless a determination has already been made by the City. 20Client Name | Project NamePage 1000 of 1311

21City of Beaumont
On-Call Planning and Environmental Services
f Categorical Exemption: Article 19 of CEQA
Guidelines (Sections 15300 to 15333) lists the criteria for categorical exemptions. If it is determined that a
project is within one of the classes of projects, which have been determined not to have a significant
impact on the environment, that project would be
exempt from provisions of CEQA. Additionally, if
it is determined through the IS analysis that no
significant impacts would result from the said
project, a CE would be prepared, and no additional
environmental documentation will be required.
f Negative Declaration: Per the analysis in the IS
or the City’s prior finding, if it is determined that
the potential impacts of the project are less than
significant such that no mitigation measures would be required, an ND would be the appropriate CEQA document for that project. The ND will be prepared in compliance with Article 6 of CEQA Guidelines (Section 15070 to 15075), which includes the criteria, requirements, contents, and process for an ND.
f Mitigated Negative Declaration: If it is determined that the project would result in potentially significant impacts, and that mitigation measures would be required to reduce the potentially significant impacts to less than significant level, an MND would be the appropriate type of environmental documentation for that project. The MND will be prepared in compliance with Article 6 of CEQA Guidelines (Section 15070 to 15075), which includes the criteria, requirements, contents, and process for an MND. f Environmental Impact Report: If it is determined that the project would result in potentially significant impacts, and the impacts of the project are such that, even with incorporation of mitigation measures, some of the impacts would remain significant and unavoidable, an EIR would be the appropriate type of environmental documentation for that project. The EIR will be prepared in compliance with Article 7 of CEQA Guidelines (Section 15080 to 15097), which includes the criteria, requirements, and process for an EIR. Article 9 of CEQA Guidelines (Sections 15120 to 15132) lists the contents of an EIR. The specific type of EIR (e.g., project, program, master) will depend on the scale, schedule/duration, phasing, and level of detail available.

Regardless of the type of the document, upon completion, administrative or screencheck drafts of the environmental document will be provided to City staff and the applicant for review. Upon receipt of comments, they will be addressed prior to resubmitting the document for a second round of review. The draft document will be approved by the City prior to distribution for public review.

Psomas will distribute the draft documents for public review. 21Client Name | Project NamePage 1001 of 1311

22City of Beaumont
On-Call Planning and Environmental Services
Final Environmental Document
f Final Negative Declaration or Mitigated Negative Declaration: Upon completion of the 20- or 30-day public review period for an ND or MND, Psomas will coordinate with the City on the approach to preparing responses received on the ND or MND. Preparation of responses to comments on an ND or MND is not required but recommended to assist the City in the decision-making process. All environmental comments on the ND or MND will receive responses. Upon finalizing the response to comments they will be mailed out to the commenting agencies at least 10 calendar days prior to any public hearings.
f Final Environmental Impact Report: Upon completion of the 45-day public review period for a draft EIR, Psomas will coordinate with the City on the approach to preparing responses to comments on the draft EIR. Upon finalizing the final EIR and response to comments, including errata, Psomas will mail out the responses to commenting agencies at least 10 calendar days prior to any public hearings.
f Mitigation Monitoring and Reporting Program: Pursuant to Section 15097 of the State CEQA Guidelines, Psomas will prepare a Mitigation Monitoring and Reporting Program (MMRP) for the CEQA document (MND and EIR).

The MMRP will confirm that the mitigation measures proposed and contained in the final environmental document are implemented. f Findings of Fact and Statement of Overriding Considerations: As part of the final EIR, Psomas will prepare the findings of fact and, if applicable, a statement of overriding considerations, for the project pursuant to Sections 15091 and 15093 of the State CEQA Guidelines.
f Noticing: Psomas will prepare and distribute all applicable notices for all types of CEQA and NEPA documents, upon project initiation, public distribution of CEQA and NEPA documents, and document certification.

This task will include Notice of Exemption (NOE), Notice of Completion (NOC), Notice of Availability (NOA), Notice of Intent (NOI) (to adopt an ND or an MND), Notice of Preparation (NOP), and Notice of Determination (NOD).

Attendance at Meetings and Public Hearings
Throughout the environmental process, Psomas will attend various meetings, including project team meetings, community meetings (if requested), and scoping meeting. Additionally, upon completion of the environmental document, Psomas will attend Planning Commission and City Council public study sessions (if requested) and public hearings where decision makers consider projects. Psomas will be available to make presentations and/or provide input to the City and address questions regarding CEQA.
22Client Name | Project NamePage 1002 of 1311

23City of Beaumont
On-Call Planning and Environmental Services

J ADDITIONAL INFORMATION

I COST PROPOSAL
Per the instructions of the RFP, we have provided our cost proposal under separate cover.

Additional Project Manager References
We have provided two additional project references for our Project Manager, Charles Holcombe III.

Reference
Contact Information Project and Description
City of Banning
99 E Ramsey Street
Banning, CA 92220
Adam Rush Community Development
Director
951.922.3131
[email protected]
Services completed 7/2010
Banning Gateway Project IS/MND, City of Banning, CA: Mr. Holcombe assisted in preparing an IS/MND for the Banning Gateway Project, which proposed to construct 12 office/warehouse buildings and associated parking on approximately 63.98 acres located north of the intersection of Ramsay Street and Hathaway Street, in the eastern portion of the City of Banning. The project proposed up to 1,194,045 SF of office and warehouse uses.

Riverside County Planning Department
4080 Lemon Street
12th Floor
Riverside, CA 92501
Brett Dawson
Project Planner
951.955.0972
[email protected]
Services completed 10/2017
San Gorgonio Crossings Project EIR, Riverside County, CA: Mr. Holcombe managed the preparation of the San Gorgonio Crossings EIR and associated technical studies, including a Paleontological Resources Survey, Phase I Cultural Resources Survey, Air Quality Analysis, Health Risk Assessment (HRA), GHG Emissions Analysis Report, and a Noise Impact Analysis, to evaluate the potential environmental impacts associated with the construction and operation of the San Gorgonio Crossing Project in Riverside County. The proposed project would construct two industrial buildings totaling more than 2.5 million SF on approximately 229 acres near Cherry Valley, California.

Approximately 160 acres (70 percent) of the project site would be developed, with 68 acres remaining as natural open space. Key project issues included land use compatibility with nearby rural homes, air emissions from diesel trucks, traffic, noise, and an earthquake fault that traverses the site. The County received more than 700 comment letters on the recirculated Draft EIR for this highly controversial project and coordinated the ability to provide prompt responses to these comments in an expedited manner kept the project on schedule to meet the County’s General Plan Amendment (GPA) cycle.
23Client Name | Project NamePage 1003 of 1311

24City of Beaumont
On-Call Planning and Environmental Services
Provide an environment
where employees feel RESPECTED, have access
to equitable opportunities,
and where all backgrounds,
experiences, and
perspectives are embraced.

RECOGNIZE and honor
individuals whose actions
reflect our organization’s
commitment to social
responsibility and
accountability.

Initiate and COLLABORATE
in meaningful dialogue
around justice, equity,
diversity, inclusion and
belonging.

Promote a culture
of SERVICE through
outreach efforts, building
connections, and
providing support for
underrepresented groups
in our communities.

Actions we are undertaking in support of Psomas’ organizational values include:

Psomas' Purpose and Values
At Psomas, we use our talents and passions to improve the environment for humankind.

Inspiration through Teamwork
At Psomas, we prefer the team approach. Through collaboration and brainstorming, we inspire each other. In addition to our local teams, we work with our colleagues in Psomas offices across the Western U.S. This gives us a broad range of resources and expertise to draw from and learn from as well.

A Culture of Mentoring
Our culture of open communication and mentorship certainly produces better projects, but it also translates into a welcoming and supportive working environment. Our management style centers around encouraging open dialogue and promoting professional growth. It’s important to us that our employees reach the height of their potential and we do everything to support them.

Psomas strives to enhance
and sustain an inclusive
and equitable culture that
respects and celebrates
all individuals. We are
committed to fostering
an environment where
our employees can bring
their authentic selves to
work and are empowered
to use their talents to best
serve our community.

Psomas carries professional liability insurance including liability at a minimum of one million per claim, worker’s compensation, and vehicle coverage including comprehensive and collision insurance. The required insurance will remain in force at the time of contract execution.

K INSURANCE

J ADDITIONAL INFORMATION (CONTINUED)
24Client Name | Project NamePage 1004 of 1311

25City of Beaumont
On-Call Planning and Environmental Services

L APPENDIX
Exceptions to the Standard
Service Agreement
Psomas respectfully requests the following
modifications to the City of Beaumont's RFP and
Professional Services Agreement (delete blue text/
insert orange text).

RFP, PAGE 5:

M. The firm will be required to have professional
liability insurance including liability at a minimum
of one million per claim occurrence, worker’s
compensation, and vehicle coverage including
comprehensive and collision insurance naming the
City of Beaumont as additional insured.

PROFESSIONAL SERVICES AGREEMENT:

5. Obligations of CONTRACTOR.

5.06. CONTRACTOR represents that it possesses
all required licenses necessary or applicable to the
performance of Services to practice its profession
under this Agreement and the Proposal and shall
obtain and keep in full force and effect all permits
and approvals required to perform the Services
herein practice its profession. In the event CITY
is required to obtain an approval or permit from
another governmental entity, CONTRACTOR shall
provide, at CITY’s expense, all necessary supporting
documents to be filed with such entity.

6. Insurance.

6.04. ...Errors and omissions insurance in a minimum
amount of $2 million per occurrence claim to cover
any negligent acts or omissions committed...

7. General Conditions pertaining to Insurance Coverage

7.03. ...The certificates of insurance hereunder shall
state that coverage shall not be suspended, voided,
canceled by either party, or reduced in coverage
or in limits, except after thirty (30) days' prior
written notice has been given to CITY, ten (10) days if cancellation is due to non-payment of premium.

7.06. CONTRACTOR agrees to provide immediate
notice to CITY of any claim or loss against
CONTRACTOR or arising out of the Services
performed under this Agreement...

8. Indemnification.

8.01, item a. ...including expert witness fees and
any other costs or expenses of any kind whatsoever
without restriction or limitation to the extent
incurred in relation to, as a consequence of or arising out of, or in any way attributable actually, allegedly
or impliedly, in whole or in part to CONTRACTOR’S
willful misconduct or negligent the performance of
this Agreement...(and/or CONTRACTOR’s agents and/
or employees) is alleged to be an employee of CITY.

All obligations under this provision are to be paid by
CONTRACTOR as they are incurred by CITY.
b. ...CONTRACTOR shall not be required to indemnify
and hold harmless CITY as set forth above for
liability to the extent attributable solely to the fault of...

10. Termination of Agreement.

10.02. ...Immediately upon termination payment,
CONTRACTOR agrees to promptly provide and deliver
to CITY...

12. Ownership of Documents; Audit.

12.01. ...At the CITY’s sole discretion, CONTRACTOR
may be permitted to retain original documents, and
furnish reproductions to CITY upon request, at no
cost to CITY. CONTRACTOR shall not be responsible
for any claims, costs or damages related to CITY’S
use of such materials on any project other than that
for which they were prepared.

12.02. ...nor authorize others to do so, without the
prior written consent of CITY. This obligation
does not apply to data or materials (a) known by
CONTRACTOR prior to this Agreement; (b) in the
public domain, or (c) required to be disclosed by
operation of law.

Resumes
Detailed resumes for our proposed team and
subconsultants are provided on the following pages.
25Client Name | Project NamePage 1005 of 1311

A-1City of Beaumont
On-Call Planning and Environmental Services
Charles Holcombe III, MBA – Psomas
Project Manager
Charles Holcombe, MBA, has more than 17 years of experience as an Environmental Planner and Project Manager specializing in Environmental Impact Assessments (EIAs) and urban and regional land use planning for both the public and private sectors. He has authored General Plan Updates, Specific Plans, EIRs, Environmental Assessments (EAs), and IS/MNDs for such planning efforts.

Mr. Holcombe possesses strong technical understanding of both CEQA and NEPA. He also has a wide range of project experience developing environmental compliance strategies under CEQA and NEPA for industrial facilities, residential and commercial projects, educational and public facilities, and roadway and regional recreation centers.

Experience
Brookside South Recharge Project IS/MND, San Gorgonio Pass Water Agency – City of Beaumont, CA: Assisted in preparing and revising an IS/MND for the Brookside South Recharge Project, which proposes to divert state water project (SWP) water to the concrete-lined Mountain View Channel and convey the water 5,822 linear feet (LF) to the confluence with Noble Creek. Once in Noble Creek, the SWP water would be used to recharge the Beaumont groundwater basin.

Recharge would be facilitated by the seasonal construction of up to 37 earthen berms, which would form a series of small flow-through recharge basins along 5,580 LF of Noble Creek. Berms would be annually leveled prior to the onset of the wet season to allow unimpeded flows. Additional work included rewriting each section to ensure consistency with the new technical studies that were required after the San Gorgonio Pass Water Agency decided to extend the channel to approximately 6,400 LF.

Beaumont Industrial Park EIR and Crossroads Industrial Park Complex Addendum – City of Beaumont, CA: As the Project Manager for the Beaumont Industrial Park EIR and Crossroads Industrial Park Complex Addendum project, managed the preparation of a letter report analyzing the adequacy of the proposed Bonito Beaumont Industrial Park’s site plan dated January 5, 2010, and the site plan’s consistency with the certified EIR (SCH No. 98101012) for the Rolling Hills Ranch Specific Plan Addendum (Amendment No. 2) dated April 2004 and approved site plan dated October 29, 2007. The project site was approved in 1991 as the Rolling Hills Ranch Specific Plan residential development (SCH 90020369).

After project approval, revisions to the Rolling Hills Ranch Specific Plan required a new EIR to be prepared for the Southwest Properties Transportation System, which was certified in January 2000 (SCH No. 98101012). The 2000 EIR included the first amended Rolling Hills Ranch Specific Plan in its entirety and appropriate information from the 1991 EIR. In 2004, the project description was modified to include an industrial warehouse/manufacturing center identified as the Crossroads Industrial Park Complex System (SCH No. 98101012). The Crossroads Industrial Park Complex would consist of a contemporary industrial warehouse complex, supporting approximately three million square feet of building space,

EDUCATION
MBA/University of
Redlands
BA/Environmental
Studies/University of
Redlands

CERTIFICATIONS
California Real Estate
License/No. 01453065
Certified Project
Manager/Michael
Brandman Associates
Certified Financial
Consultant/Financial
2000

PROFESSIONAL AFFILIATIONS
Association of
Environmental
Professionals
California Association of
Realtors
East Valley Association
of Realtors
Urban Land Institute,
Inland Empire

EXPERIENCE
With Psomas for less
than one year; with
other firms for 17 years
A-1Client Name | Project NamePage 1006 of 1311

A-2City of Beaumont
On-Call Planning and Environmental Services

5.34 acres of open space and approximately 15 acres of landscaped areas. The City of Beaumont determined, pursuant to CEQA Guidelines Section 15164, that an addendum to the certified Final EIR for the Southwest Properties Transportation EIR (2000) was required. Consequently, an addendum was prepared for the Crossroads Industrial Park complex, which was approved in April 2004.

Leadership in Energy and Environmental Design Certified I-10 Distribution Center EIR, Shopoff Group – Riverside County, CA: As the Project Manager for the I-10 Distribution Center project, managed the preparation of an EIR for the Shopoff Group’s I-10 Distribution Center project located in Riverside County.

The proposed distribution center consists of two industrial buildings totaling approximately 2,555,600 SF for industrial-type use. In addition, the project included photovoltaic solar facilities and the building rooftops were designed to facilitate solar energy conversion apparatus. The project site is located on 228 acres on the north side of Cherry Valley Boulevard, between the cities of Calimesa and Beaumont. The project was processed as a fast-track application (2010 completion date) through the County of Riverside.

San Gorgonio Crossings Project EIR, Cherry Valley – Riverside County, CA:

Managed the preparation of the San Gorgonio Crossings EIR and associated technical studies, including a Paleontological Resources Survey, Phase I Cultural Resources Survey, Air Quality Analysis, Health Risk Assessment (HRA), GHG Emissions Analysis Report, and a Noise Impact Analysis, to evaluate the potential environmental impacts associated with the construction and operation of the San Gorgonio Crossing Project in Riverside County. The proposed project would construct two industrial buildings totaling more than 2.5 million SF on approximately 229 acres near Cherry Valley, California. Approximately 160 acres (70 percent) of the project site would be developed, with 68 acres remaining as natural open space. Key project issues included land use compatibility with nearby rural homes, air emissions from diesel trucks, traffic, noise, and an earthquake fault that traverses the site. The County received more than 700 comment letters on the recirculated Draft EIR for this highly controversial project and coordinated the ability to provide prompt responses to these comments in an expedited manner kept the project on schedule to meet the County’s General Plan Amendment (GPA) cycle for 2017. This project was processed under the County of Riverside’s Fast Track Program and was approved by the Board of Supervisors in October 2017.

Public Safety Enterprise Communication Facilities EIR – Riverside County, CA:

Assisted in conducting baseline research, writing select air quality rules and regulations, and preparing the maps and photo exhibits for the Public Safety Enterprise Communication Facilities Programmatic EIR. The proposed project would install a communication tower and related facilities (i.e., generator, building, perimeter fence), construct access roads, and construct numerous new communications facilities throughout Riverside County and along the Riverside County borders in the counties of Orange, San Bernardino, and San Diego. The project would expand the Riverside County emergency services radio tower network from 25 sites to approximately 70 sites throughout the County.

Charles Holcombe III,
MBA
(Continued)
A-2Client Name | Project NamePage 1007 of 1311

A-3City of Beaumont
On-Call Planning and Environmental Services
Jennifer Marks – Psomas
Principal-in-Charge
Jennifer Marks is a Senior Project Manager with over 24 years of experience in environmental documentation and analysis consistent with CEQA and NEPA.

Jennifer’s career has focused on a wide variety of projects, including specific plan and general plan analyses; transportation infrastructure; public works assignments related to water resources; and various utility infrastructure projects. She has also performed environmental consulting services for mixed- use, residential, office, higher education, and resort developments. She has managed multiple water and wastewater infrastructure projects, including projects for the Santa Margarita Water District; Irvine Ranch Water District; City of Anaheim Public Utilities Department for water projects and Public Works Department for sewer projects; and the Water Replenishment District of Southern California. She has also prepared environmental documentation and supplemental information to meet specific agency requirements, including those for the following agencies: Caltrans; State Water Resources Control Board; U.S. Bureau of Reclamation; U.S. Environmental Protection Agency; USACE; USFWS; CDFW; various local planning and development departments; and private developers. Through her project work, Jennifer has developed strong working relationships with agency personnel, County and City staff, private developers, and a variety of specialty consultants.

Experience
Mt. San Antonio College, 2018 Educational and Facilities Master Plan EIR – Walnut, CA: Project Manager for implementation of the 2018 Educational and Facilities Master Plan, which serves as Mt. SAC’s long-range development plan, over a 10-year horizon period. The plan was evaluated in the EIR at a program level with the expectation that additional analyses may be required as specific projects are proposed. In addition to the EIR, Psomas also prepared technical analyses to support the EIR, including air quality, biological resources, cultural and tribal resources, greenhouse gas emissions, hydrology and water quality, and traffic analyses.

University of California, Riverside, Student Success Center IS/MND – Riverside, CA: Project Manager for the preparation of an IS/MND’s Student Success Center, a new 3- to 4- story facility with a maximum building capacity of 80,000 gross square feet (GSF), and approximately 1,070 general assignment classroom seats.

The project would provide (1) general assignment classrooms designed for modern pedagogy and technology; (2) multipurpose student life spaces for use by student organizations and areas for scholarly activity such as tutoring, mentoring, and study; and (3) (shelled) dining services venue. The IS/MND was tiered from UCR 2005 Long-Range Development Plan EIR and the 2005 Long-Range Development Plan Amendment 2 EIR.

University of California, Riverside, School of Medicine Building II IS/MND – Riverside, CA: Project Manager for preparation of a tiered IS/MND. The project involves construction of a new facility consisting of instructional, collaboration, and student life space, as well as office and support spaces. The project would be located

EDUCATION
1999/BS/Natural
Resources, Planning and
Interpretation/Humboldt
State University

PROFESSIONAL

AFFILIATIONS
American Society of Civil
Engineers
Environmental and
Water Resources
Institute

EXPERIENCE
With Psomas for 23
years; with other firms
for 1 year
A-3Client Name | Project NamePage 1008 of 1311

A-4City of Beaumont
On-Call Planning and Environmental Services
in an area currently developed as a surface parking lot and the School of Medicine modular trailer. The IS/MND was tiered from the UCR 2005 Long Range Development Plan EIR and the 2005 Long Range Development Plan Amendment 2 EIR.

Mt. San Antonio College, Parking and Circulation Master Plan – Walnut, CA:

Environmental Project Manager provided professional services to improve parking and circulation opportunities on campus. The environmental documentation required will be based on the Facilities Master Plan in 2002 and take into account the project’s proposed actions or the community’s concerns with future projects.

Possible documents include an Addendum or Program, Project, Subsequent, or Supplemental EIR. Psomas is providing a two-phased approach to determine the level of documentation required. Phase 1 is a general assessment of need, which will assist in determining the appropriate level of environmental documentation listed above and Phase 2 will present an overview of possible CEQA and/or NEPA documentation, or a fulfillment of the need established in Phase I.

City of Rancho Cucamonga General Plan Update Program EIR – Rancho Cucamonga, CA: Project Manager for this project, which involved an update to the 2001 General Plan, providing guidance for future development in the City of Rancho Cucamonga and its Sphere of Influence over the next 15 to 20 years.

Adoption of the proposed General Plan Update allows for an increase in development potential throughout the City and the addition of transit-supported, mixed-use development along the City’s main transportation corridors. Jennifer worked closely with the City, the Client, and various technical consultants to prepare the Program EIR under a very compressed timeframe.

Eastern Municipal Water District, Wellhead Treatment Facility Constraints Analysis and IS/MND (Well 56) – Perris, CA: Project Manager for an Initial Study and Mitigated Negative Declaration and related technical analyses to evaluate the impacts of the construction of a wellhead treatment facility for the purpose of removal of perfluorooctonoic acid (PFOA) and perfluorooctane sulfonate (PFOS).

A constraints analysis was prepared to evaluate several potential locations for the proposed wellhead treatment facilities. The site options were reduced to five feasible alternatives and Psomas prepared the CEQA documentation to fully evaluate each alternative.

Jefferson at Empire Lakes Addendum to an EIR – Rancho Cucamonga, CA:

Assistant Project Manager for the preparation of an Addendum to the Rancho Cucamonga Industrial Area Specific Plan Subarea 18 Specific Plan Final EIR for the Jefferson at Empire Lakes project in Rancho Cucamonga. The project involved the development of 20.5 acres of agriculture into a 521-unit, high-density apartment complex adjacent to the Empire Lakes Golf Course.

Integra Perris Distribution Center EIR – Perris, CA: Assistant Project Manager for the preparation of an Addendum for this project, which involves the expansion of the Integra Perris Distribution Center (IPDC) to include an approximately

10.2-acre parcel located immediately southwest of the IPDC site. The expansion would allow for the construction of a 273,000-SF warehouse building, attached to the west end of the existing IPDC building. Jennifer assisted in the preparation of various sections of the EIR.

Jennifer Marks
(Continued)
A-4Client Name | Project NamePage 1009 of 1311

A-5City of Beaumont
On-Call Planning and Environmental Services
Sean Noonan, AICP – Psomas
Environmental Planner
Sean Noonan, AICP, is an Environmental Planner and Project Manager with 12 years of experience working on various types of public and private projects across Southern California. In his current role, Sean prepares and manages the preparation of CEQA/NEPA environmental documents and supporting environmental technical studies. He is also experienced in providing his clients with support related to regulatory permitting, environmental compliance during final design and construction, and environmental constraints during due diligence. Sean works on various project types, but is particularly experienced in providing environmental consulting services for transportation and other infrastructure projects.

Experience
Gateway Highlands – Moreno Valley, CA: Project Manager for the preparation of an IS/MND. This project consisted of 108 hillside residential units. Sean coordinated environmental technical studies and was the primary author of the IS/MND. Sean efficiently updated the IS/MND analyses to account for last minute changes to the grading plan and water quality management plan.

Santa Ana River Levee Stabilization Project – Riverside County, CA: Project Manager for preparation of technical studies to support the rehabilitation of a portion of the Santa Ana River levee including removal, disposal, and replacement of approximately 6,200 LF of rock slope protection with a grouted rock slope protection and extending the levee armoring deeper below the calculated scour depths. Technical studies prepared include Air Quality Assessment, Phase I Cultural Resources Inventory, Greenhouse Gas Emissions Analysis, and a Hazardous Waste Sites and Soil Contamination Records Technical Memorandum.

Los Angeles Department of Water and Power As-Needed Regulatory Permitting Services – Los Angeles, CA: Regulatory Specialist for the preparation of Jurisdictional Delineations (JDs) under MBC Aquatics Los Angeles Department of Water and Power (LADWP) On-Call Receiving Water Monitoring Services.

Psomas has conducted 21 JDs and various biological services for LADWP from 2017-2020. Sean conducts field work, prepares jurisdictional delineation reports, and provides regulatory permitting support. Sean has completed eight JDs for LADWP; six in Los Angeles County including Castaic-Haskell L3 Project, Adelanto-Toluca Line 1 500kV Reconductoring Project, Power Pole Replacement Project, Spunky Canyon Weir Maintenance Project, Kenneth Hahn State Recreation Area, and Celilo Sylmar Tower Replacement Project. Sean also prepared a jurisdictional delineation for the South Haiwee, Little Lake, and Jawbone Canyon Projects in Inyo County and Kern County, CA and for the Adelanto Converter Station Project in the County of San Bernardino.

City of Arcadia On-Call Environmental Services – Arcadia, CA: Project Manager on numerous task orders from approximately 2018 to the present with various divisions in the Development Services Department, including Planning Division,

EDUCATION
2014/MS/Urban and
Regional Planning/
California State
Polytechnic University,
Pomona
2011/MA/Geography/
California State
University, Fullerton
2006/BA/History/
University of California,
Santa Barbara

CERTIFICATIONS
American Institute of
Certified Planners/
American Planning
Association/027853

PROFESSIONAL

AFFILIATIONS
American Institute of
Certified Planners
American Planning
Association
Association of
Environmental
Professionals

EXPERIENCE
With Psomas for 4 years;
with other firms for 8
years
A-5Client Name | Project NamePage 1010 of 1311

A-6City of Beaumont
On-Call Planning and Environmental Services
Engineering Division, and Transportation Services Division. This has involved preparation of IS/MNDs, CEs, and supporting technical analyses, including air quality and noise analyses and/or arborist surveys, as well as pre-construction nesting bird for a variety of projects.

Carlsbad Veterans Park, Master Planning and Environmental Permitting Phase – Carlsbad, CA: Environmental Planner for providing professional services for new 91.5-acre park. The developable area of the site was only 48 acres due to the presence of native vegetation preserves. The program for the project included active and passive recreation amenities, an open space interpretive area, public art, trails, utilities, parking, restrooms, and maintenance facilities. Psomas provided civil engineering, environmental, and surveying services for the Project Master Planning Phase and environmental permitting to result in final design concepts and required permits and authorizations for improvements.

More specifically, civil engineering master planning support services included development of project constraints, concept grading and utilities plans, CEQA level hydrology and stormwater management reports, traffic impact analysis, and hillside management plans. Sean coordinated environmental technical studies and was the primary author of the IS/MND.

Arcadia Town Center Initial Study/Mitigated Negative Declaration – Arcadia, CA: Environmental Planner for the preparation of an IS/MND on this project, which consists of 181 residential units and 13,130 SF of groundfloor commercial uses. Given the location of this project in downtown Arcadia, this project involves a high level of coordination with the City and Applicant to develop a comprehensive description of how the project would be constructed, including details such as staging, contractor parking, excavation and temporary shoring methods, and utility relocation. Psomas also prepared technical analyses in support of this project, including a traffic study as well as air quality, greenhouse gas emissions, noise, and cultural analyses. Sean coordinated the environmental technical studies and was the primary author of the IS/MND.

Central Harbor Boulevard Transit Corridor – Orange County, CA: Project Manager worked with the Orange County Transportation Authority (OCTA) staff to develop a project description, and then to prepare a Preliminary Environmental Assessment (PEA) Memorandum to identify the appropriate level of environmental documentation required for the National Environmental Policy Act (NEPA) and California Environmental Quality Act (CEQA) compliance.

SR-1 (Lincoln Boulevard) Multimodal Improvements Project EIR/EA – Los Angeles, CA: Environmental Planner for the preparation of the Environmental Impact Report/Environmental Assessment and supporting technical studies for this project. The project includes the widening of Lincoln Boulevard from Fiji Way to Jefferson Boulevard to provide capacity for future light rail transit, with three vehicle lanes in each direction, Class II bicycle lanes, and sidewalks on both sides of the bridge. The project includes replacement of the Lincoln Boulevard Bridge over Ballona Creek, and replacement of the Culver Boulevard overpass while minimizing impacts to the creek and wetlands.

Sean Noonan, AICP
(Continued)
A-6Client Name | Project NamePage 1011 of 1311

A-7City of Beaumont
On-Call Planning and Environmental Services
Jordan Werkmeister – Psomas
Environmental Planner
Jordan Werkmeister is a recent graduate from the University of California, Davis, with a degree in Environmental Policy Analysis and Planning and also worked with Psomas as an Environmental Planning Intern prior to graduation. During that time and since joining Psomas full-time, Jordan has worked on a variety of CEQA and NEPA documents, including preparation of initial studies, reviewing plans and drafting project descriptions, and writing key analysis sections. As an Environmental Planner, Jordan will prepare environmental documents, assist with management efforts, and coordinate with internal staff and subconsultants.

Experience
Parkwest Development IS/MND – Fullerton, CA: Environmental Planner for this project, which involves the redevelopment of a 2.5-acre site with apartment units, hotel, retail, restaurant, a pedestrian bridge, and parking. The project is a multi- story development, ranging from 8 to 10 stories in height and proposes to: 1) construct apartments, a hotel, retail uses, and a roof-top restaurant; 2) demolish an existing parking structure and construct apartments; 3) reconfigure the surface parking lot in front of the Train Depot to provide better flow and parking; and 4) construct a pedestrian bridge over East Santa Fe Avenue connecting the new parking structure to the hotel and apartments. Jordan is assisting in preparation of the IS/MND.

Tustin Ranch Hills Planned Development EIR – County of Orange, CA:

Environmental Planner for this project, which consists of the replacement of the existing Tustin Hills Racquet and Pickleball Club with a Planned Unit Development consisting of 17 buildings containing 34 single-family townhome units and three single-family detached units for a total of 37 units. Jordan assisted in the preparation of environmental technical studies and the EIR for this project.

SR-1 (Lincoln Boulevard) Multimodal Improvements Project EIR/EA – Los Angeles, CA: Environmental Planner for the preparation of the Environmental Impact Report/Environmental Assessment and supporting technical studies for this project. The project includes the widening of Lincoln Boulevard from Fiji Way to Jefferson Boulevard to provide capacity for future light rail transit, with three vehicle lanes in each direction, Class II bicycle lanes, and sidewalks on both sides of the bridge. The project includes replacement of the Lincoln Boulevard Bridge over Ballona Creek, and replacement of the Culver Boulevard overpass while minimizing impacts to the creek and wetlands.

City of Moorpark Civic Center Master Plan Project – Moorpark, CA:

Environmental Planner for this project, which consists of the phased development of a new Civic Center for the City of Moorpark. The project would be gradually developed over four phases and would ultimately include a City Library building and a City Hall building, as well as other commercial and residential uses. Psomas prepared environmental technical studies and the Environmental Impact Report for this project.

EDUCATION
2022/BS/Environmental
Policy Analysis and
Planning/University of
California, Davis

CERTIFICATIONS
Social and Behavioral
Research Training/
University of California,
Davis/43105809

EXPERIENCE
With Psomas for 1 year;
with other firms for 2
years
A-7Client Name | Project NamePage 1012 of 1311

A-8City of Beaumont
On-Call Planning and Environmental Services
Tin Cheung – Psomas
Air Quality and Noise Manager
Tin Cheung has 29 years of experience conducting air quality, climate change, noise, and vibration studies for CEQA and NEPA compliance. His experience includes preparing air pollutant emissions inventories, dispersion modeling, climate change, and health risk assessments (HRAs) using a variety of computer data models. He is also proficient in conducting noise and vibration studies for stationary and mobile sources. He has employed monitoring equipment for the measurement of noise, vibration, and particulate matter.

Mr. Cheung’s project experience includes analyses of land uses, including large- scale infrastructure, residential, commercial, industrial, educational, energy, and recreational uses. He has extensive knowledge of the CEQA/NEPA regulatory process and impact assessment methods established by USEPA, the California Air Resources Board (CARB), and local air quality management districts. Tin has also performed third-party reviews for technical adequacy and CEQA compliance in support of legal efforts and government quality assurance/quality control.

Experience
Colton Community Soccer Park Initial Study and Mitigated Negative Declaration – Colton, CA: Air Quality and Noise Manager for an IS/MND and an MMRP for the City’s proposed community soccer park. The community park will include eight lighted soccer fields that can host soccer tournaments as well as provide local teams with practice facilities. The proposed project will be constructed and operated on a 21-acre portion of the 45-acre site with the remaining 24 acres retained as natural open space along the Santa Ana River.

Infrastructure improvements include paved parking; restroom and concession buildings; a police sub-station; breezeways with seating; child play areas; multipurpose trails; shaded spectator seating, and a maintenance yard with a cellphone tower. Major environmental issues addressed in the IS/MND include potential impacts to the river and associated biological resources and the presence of a former landfill beneath the property.

Santa Ana River Levee Stabilization Project – Riverside County, CA: Air Quality and Noise Manager for preparation of technical studies to support the rehabilitation of a portion of the Santa Ana River levee including removal, disposal, and replacement of approximately 6,200 LF of rock slope protection with a grouted rock slope protection and extending the levee armoring deeper below the calculated scour depths. Technical studies prepared include Air Quality Assessment, Phase I Cultural Resources Inventory, Greenhouse Gas Emissions Analysis, and a Hazardous Waste Sites and Soil Contamination Records Technical Memorandum.

Eastern Municipal Water District, Wellhead Treatment Facility Constraints Analysis and IS/MND (Well 56) – Perris, CA: Air Quality and Noise Manager for an Initial Study and Mitigated Negative Declaration and related technical analyses to evaluate the impacts of the construction of a wellhead treatment facility for

EDUCATION
1993/BA/Geography and
Environmental Studies/
University of California,
Santa Barbara

PROFESSIONAL

AFFILIATIONS
Association of
Environmental
Professionals

EXPERIENCE
With Psomas for 6 years;
with other firms for 23
years
A-8Client Name | Project NamePage 1013 of 1311

A-9City of Beaumont
On-Call Planning and Environmental Services
the purpose of removal of perfluorooctonoic acid (PFOA) and perfluorooctane sulfonate (PFOS). A constraints analysis was prepared to evaluate several potential locations for the proposed wellhead treatment facilities. The site options were reduced to five feasible alternatives and Psomas prepared the CEQA documentation to fully evaluate each alternative.

Merrill Avenue Brownstones Initial Study/Mitigated Negative Declaration – Riverside, CA: Air Quality and Noise Manager for the IS/MND for the proposed mixed-use development with a total floor area of 98,608 SF and consisting of 108 dwelling units and associated amenities (leasing office, club room, swimming pool and spa, fitness center, and cabana) and an additional 1,200 SF of retail space which would be located on the ground floor. In addition, the Merrill Avenue street section would be modified to provide on-street parking immediately adjacent to the project site. The IS/MND addressed impacts related to noise, vibration, pollutant emissions, and toxic emissions associated with train activity on the tracks north of the site, as well as the traffic impacts from the narrowing of Merrill Avenue and during the holiday season at the Riverside Plaza shopping center to the south.

University of California, Riverside, Student Success Center Initial Study/ Mitigated Negative Declaration – Riverside, CA: Air Quality and Noise Manager for the preparation of an IS/MND’s Student Success Center, a new 3- to 4- story facility with a maximum building capacity of 80,000 gross square feet (GSF), and approximately 1,070 general assignment classroom seats. The project would provide 1) general assignment classrooms designed for modern pedagogy and technology; 2) multipurpose student life spaces for use by student organizations and areas for scholarly activity such as tutoring, mentoring, and study; and 3) (shelled) dining services venue. The IS/MND was tiered from UCR 2005 Long- Range Development Plan EIR and the 2005 Long-Range Development Plan Amendment 2 EIR.

University of California, Riverside, School of Medicine Building II IS/MND – Riverside, CA: Air Quality and Noise Manager for preparation of a tiered IS/MND.

The project involves construction of a new facility consisting of instructional, collaboration, and student life space, as well as office and support spaces. The project would be located in an area currently developed as a surface parking lot and the School of Medicine modular trailer. The IS/MND was tiered from the UCR 2005 Long Range Development Plan EIR and the 2005 Long Range Development Plan Amendment 2 EIR.

Limonite Avenue Widening, Bain to Homestead, Mitigated Negative Declaration – Jurupa Valley, CA: Air Quality and Noise Manager for an MND and various technical studies for the widening of a major community arterial in the central-western portion of the City. Major issues include permanent and temporary access changes for local property owners, impacts to biological resources associated with Pyrite Creek and the nearby Santa Ana River, and short-term noise and air pollutant emissions.

Gateway Highlands – Moreno Valley, CA: Air Quality and Noise Manager for the preparation of an IS/MND. This project consisted of 108 hillside residential units.

Tin Cheung
(Continued)
A-9Client Name | Project NamePage 1014 of 1311

A-10City of Beaumont
On-Call Planning and Environmental Services
Charles Cisneros, MS, RPA – Psomas
Cultural Resources Manager
Charles is a registered professional archaeologist with 19 years of experience in archaeological assessment and field experience in California and Nevada. He has directed numerous field projects in support of compliance with CEQA, NEPA, and Sections 106 and 110 of the National Historic Preservation Act (NHPA). Charles has managed a wide range of projects involving archaeological survey, testing, data recovery, monitoring, and laboratory analysis. He is skilled at research and data management, as well as maintaining and organizing digital and print publications.

His training and background meet the U.S. Secretary of the Interior’s Professional Qualifications Standards for prehistoric and historic archaeology and he is a California Energy Commission approved archaeologist for desert archaeology.

Experience
Colton Community Soccer Park IS/MND – Colton, CA: Cultural Resources Manager for an IS/MND and an MMRP for the City’s proposed community soccer park. The community park will include eight lighted soccer fields that can host soccer tournaments as well as provide local teams with practice facilities. The proposed project will be constructed and operated on a 21-acre portion of the 45-acre site with the remaining 24 acres retained as natural open space along the Santa Ana River. Infrastructure improvements include paved parking; restroom and concession buildings; a police sub-station; breezeways with seating; child play areas; multipurpose trails; shaded spectator seating, and a maintenance yard with a cellphone tower. Major environmental issues addressed in the IS/MND include potential impacts to the river and associated biological resources and the presence of a former landfill beneath the property. Charles provided oversight and QA/QC for Psomas’ archaeological and historic research at the CHRIS Information Center, archaeological survey, and cultural report.

Perris Circle Industrial Building 3 Project, IS/MND – Perris, CA: Senior Archaeologist to support the IS/MND for this project, that tiers from the Perris Valley Commerce Center (PVCC) Specific Plan EIR. The proposed project involves construction and operation of a 210,900 SF industrial warehouse with associated office uses and outdoor employee recreational spaces on an approximately 9.9-acre site. Responsible for preparation of the Phase I Cultural Resources Inventory and Paleontological Resource Inventory. Charles conducted Native American outreach activities to supplement the coordination conducted by the City.

University of California, Riverside, Student Success Center IS/MND – Riverside, CA:

Senior Archaeologist for the preparation of an IS/MND’s Student Success Center, a new 3- to 4- story facility with a maximum building capacity of 80,000 GSF, and approximately 1,070 general assignment classroom seats. The project would provide 1) general assignment classrooms designed for modern pedagogy and technology; 2) multipurpose student life spaces for use by student organizations and areas for scholarly activity such as tutoring, mentoring, and study; and 3) (shelled) dining services venue. The IS/MND was tiered from UCR 2005 Long-Range Development Plan EIR and the 2005 Long-Range Development Plan Amendment 2 EIR. Charles

EDUCATION
2008/MS/European
Archaeology/University
of Edinburgh, United
Kingdom
2004/BA/Anthropology/
California State
University, Los Angeles

CERTIFICATIONS
Registered Professional
Archaeologist/
Register of Professional
Archaeologists/1512280
Orange County Certified
Archaeologist/Orange
County
Riverside County
Certified Archaeologist/
Riverside County

PROFESSIONAL AFFILIATIONS
Society for American
Archaeology
Western States Folklore
Society

EXPERIENCE
With Psomas for 6 years;
with other firms for 13
years
A-10Client Name | Project NamePage 1015 of 1311

A-11City of Beaumont
On-Call Planning and Environmental Services
Cisneros was responsible for task management and provided senior oversight and support to the IS/MND analysis for cultural resources.

Eastern Municipal Water District, Wellhead Treatment Facility Constraints Analysis and IS/MND (Well 56) – Perris, CA: Cultural Resources Manager for an IS/MND and related technical analyses to evaluate the impacts of the construction of a wellhead treatment facility for the purpose of removal of perfluorooctonoic acid (PFOA) and perfluorooctane sulfonate (PFOS). A constraints analysis was prepared to evaluate several potential locations for the proposed wellhead treatment facilities. The site options were reduced to five feasible alternatives and Psomas prepared the CEQA documentation to fully evaluate each alternative.

McCanna Hills Addendum to an EIR – Riverside County, CA: Senior Archaeologist for preparation of an addendum to EIR 319 previously prepared for the McCanna Ranch Specific Plan near Lake Perris in western Riverside County. TTM33978 consists of Planning Areas 1 and 2A of the specific plan. The addendum incorporated a number of updated technical studies and current data about the nearby Mid-County Parkway. Major issues included traffic impacts expressed by the City of Perris to the west.

Mt. SAC Lot S Mitigation Monitoring – Walnut, CA: Cultural Resources Manager for this project. Psomas conducted cultural resources monitoring for the construction of a parking structure at Lot S on the Mt. SAC campus. Psomas also conducted archaeological, paleontological, and tribal cultural resources monitoring throughout the grading and earth disturbance phases of construction and prepared a Cultural and Paleontological Resources Mitigation Monitoring Report.

Merrill Avenue Brownstones IS/MND – Riverside, CA: Senior Archaeologist for the IS/MND for the proposed mixed-use development with a total floor area of 98,608 SF and consisting of 108 dwelling units and associated amenities (leasing office, club room, swimming pool and spa, fitness center, and cabana) and an additional 1,200 SF of retail space which would be located on the ground floor.

In addition, the Merrill Avenue street section would be modified to provide on- street parking immediately adjacent to the project site. The IS/MND addressed impacts related to noise, vibration, pollutant emissions, and toxic emissions associated with train activity on the tracks north of the site, as well as the traffic impacts from the narrowing of Merrill Avenue and during the holiday season at the Riverside Plaza shopping center to the south. Responsible for preparation of the Phase I Cultural Resources Inventory to support the IS/MND for this project.

The report was prepared in compliance with the City of Riverside’s guidelines for the preparation of Cultural Resource reports.

Santa Ana River Levee Stabilization Project – Riverside County, CA: Senior Archaeologist for preparation of technical studies to support the rehabilitation of a portion of the Santa Ana River levee including removal, disposal, and replacement of approximately 6,200 LF of rock slope protection with a grouted rock slope protection and extending the levee armoring deeper below the calculated scour depths. Technical studies prepared include Air Quality Assessment, Phase I Cultural Resources Inventory, Greenhouse Gas Emissions Analysis, and a Hazardous Waste Sites and Soil Contamination Records Technical Memorandum.

Charles Cisneros, MS,
RPA
(Continued)
A-11Client Name | Project NamePage 1016 of 1311

A-12City of Beaumont
On-Call Planning and Environmental Services
Brianna House – Psomas
Paleontologist
Brianna House is a professional paleontologist with five years of experience in paleontological assessment and field experience in Southern California. She has worked on several field projects in support of compliance with the California Environmental Quality Act (CEQA). Brianna has provided support on a wide range of projects involving paleontological resource monitoring, Paleontological Resource Monitoring Plans (PRMP), hydrogeology, biostratigraphy, museum education, and laboratory analysis. She is skilled at research and data management, as well as maintaining and organizing digital and print publications. Her training and background meet the U.S. Secretary of the Interior’s Professional Qualifications Standards for paleontology.

Experience
Mile Square Park Expansion Archeo/Paleo Monitoring – Orange County, CA:

Paleontologist for the paleontological resources monitoring for the OC Parks Mile Square Regional Park project located near the City of Fountain Valley.

Scope of work included developing strategies to minimize impacts to significant paleontological resources, preparing sections for the Paleontological Resources Mitigation Plan (PRMP), mitigation monitoring, correspondence with the Psomas project management team, advising construction personnel and client, and attending to project engineering details.

Aliso Wood Canyon Cultural Resources Monitoring – Orange County, CA:

Paleontologist/Field Monitor for conducting archaeological and paleontological resources monitoring to comply with the measures outlined in the Resource Management Plan for the Aliso and Wood Canyons Wilderness Park – Wondrous Watershed Trail. Tasks include coordination with OC Parks to ensure compliance with the scope of work, schedule, and budget. Brianna is the on-site field monitor for the on-the ground, close-up observation and soil examination of any type of paleontological remains that might be exposed during ground-disturbing activities.
2850 Riviera Drive - Cultural Monitoring – Laguna Niguel, CA: Paleontologist for the paleontological resources monitoring for the 2580 Riviera Drive project located in Orange County near the City of Laguna Niguel. Scope of work included developing strategies to minimize impacts to significant paleontological resources, mitigation monitoring, correspondence with the Psomas project management team, advising construction personnel and client, and attending to project engineering details.

Lancaster Health District – Lancaster, CA: Paleontologist/Field Monitor for this project. Brianna is providing paleontological resource monitoring, and preparing daily field reports for construction of two separate projects, Lancaster Health District (LHD) Phase 1 and LHD Phase 2.

EDUCATION
2023/MS/(Expected)
Geology/California State
Polytechnic University,
Pomona
2017/BS/Environmental
Geology/California State
University, Los Angeles
2014/AS/Math and
Science/Rio Hondo
College, Whittier

PROFESSIONAL

AFFILIATIONS
South Coast Geological
Society
SKILLS
Geohydrology
Paleontology
Stratigraphic Analysis

EXPERIENCE
With Psomas for 1 year;
with other firms for 4
years
A-12Client Name | Project NamePage 1017 of 1311

A-13City of Beaumont
On-Call Planning and Environmental Services
Los Angeles Department of Water and Power, Victorville to McCullough Electric Transmission Jurisdictional Delineation – Victorville, CA: Cultural Resources Specialist for a jurisdictional delineation project located in San Bernardino County, California. Brianna’s responsibilities included collecting spatial data with ARC-GIS Collector Field Maps, data management and Assistant Project Management responsibilities.

Kindred Church Biological and Cultural Resources Monitoring – Anaheim, CA:

Paleontologist/Field Monitor for this project. Psomas prepared the Initial Study/ Mitigated Negative Declaration (IS/MND) on behalf of the City of Anaheim, which was circulated for review in March 2022 and certified in June 2022. As required by Mitigation and Monitoring Program (MMP) No.380 that was adopted by the City for the Project, biological and cultural mitigation measures must be implemented prior to and during construction. Specifically, this scope of work consists of supporting the City and their team with implementation of Mitigation Measures (MMs) BIO-1, BIO-2, CUL-1, GEO-1, TCR-1, and TCR-2. Brianna’s responsibilities included developing strategies to minimize impacts to significant paleontological resources, mitigation monitoring, correspondence with the Psomas project management team, advising construction personnel and client, and attending to project engineering details.

Brianna House
(Continued)
A-13Client Name | Project NamePage 1018 of 1311

A-14City of Beaumont
On-Call Planning and Environmental Services
Amber Heredia – Psomas
Biological Resources Manager
Amber Heredia is a Senior Project Manager and Senior Biologist with 26 years of experience in the preparation of Biological Technical Reports to meet the requirements of the FESA, CESA, CEQA, NEPA, and the CWA. She has worked throughout Southern California from Kern County south through San Diego County with most of her work focused in Los Angeles, Orange, and Riverside counties. Amber has a wide range of knowledge on the plants, wildlife, and vegetation communities of Southern California, especially those listed as Threatened or Endangered. As Senior Project Manager, she has managed a variety of project types including transportation, dam/reservoir, flood control, utility, and private development projects. Amber has a thorough knowledge of protocol survey methodologies for each listed species within the region and is well-versed in the requirements of various multiple species habitat conservation plans including the Western Riverside County Multiple Species Habitat Conservation Plans (MSHCP). Amber conducts vegetation mapping, general wildlife surveys, focused surveys for southwestern willow flycatcher, least Bell’s vireo, coastal California gnatcatcher, western yellow-billed cuckoo, and burrowing owl, and assists with spring botanical surveys, herpetology surveys, and revegetation monitoring.

Experience
Stephens’ Kangaroo Rat Habitat Assessment – Lake Matthews, CA: Amber was the Project Manager for this project to assess potential habitat for Stephens’ kangaroo rat (SKR) on a 20-acre site, which was being proposed as a mitigation site for the species by a mitigation bank entity. Amber worked with a species expert who conducted the field visit to map and characterize the habitat on the site with respect to the functions and values different portions of the site would provide for SKR. Amber prepared the habitat assessment report based on the field evaluation provided by the species expert. The habitat assessment report was used by the mitigation banking entity in their coordination with CDFW to obtain approval of the mitigation site.

Perris Senior Apartments Project – Perris, CA: Amber served as the Project Manager in the preparation of technical studies to support the future CEQA document.

Technical studies included Biological Resources, Cultural Resources, Air Quality/ Greenhouse Gas Emissions, and Noise Analysis. Amber oversaw the preparation of a Habitat Assessment consistent with the Western Riverside MSHCP. She also oversaw focused surveys for special status plant species and a burrowing owl habitat assessment (no further surveys were needed based on a lack of suitable burrows).

Amber attended meetings with the client and the City to discuss the project site’s requirements under the Western Riverside MSHCP. She also coordinated with other technical experts in the preparation of their respective technical documents.

Circle City Substation Project Biological Resources Support – Riverside and San Bernardino Counties, CA: Senior Biologist for this Southern California Edison (SCE) project, which involved multiple potential sites for construction of an energy substation and several potential sites for transmission lines to and from those sites. Amber conducted protocol focused surveys for least Bell’s vireo and

EDUCATION
2005/MS/Biology/
University of California,
Riverside
1998/BS/Ecology and
Evolution/University of
California, Santa Barbara
1998/BS/Environmental
Studies/University of
California, Santa Barbara

CERTIFICATIONS
Principal Investigator for
Psomas' CDFW Entity
Scientific Collecting
Permit/SC-190240016/
California Department of
Fish and Wildlife
10(a)(1)(A) Permit for
coastal California
gnatcatcher,
southwestern willow
flycatcher, and yellow-
billed cuckoo/TE-
148554-5/U.S. Fish and
Wildlife Service

PROFESSIONAL AFFILIATIONS
Urban Land Institute
Orange County/Inland
Empire
Sea & Sage Audubon
Society
American Ornithological
Society
Southern California
Botanists
The Wildlife Society
California Native Plant
Society

EXPERIENCE
With Psomas for 24
years; with other firms
for 2 years
A-14Client Name | Project NamePage 1019 of 1311

A-15City of Beaumont
On-Call Planning and Environmental Services
southwestern willow flycatcher throughout the project study area, including along several alignments that crossed the Santa Ana River near Prado Basin and several smaller drainages. Amber also assisted with special status plant surveys.

Falcon Ridge Substation Project Biological Resources Support – San Bernardino County, CA: Biologist for this SCE project, which involved multiple potential sites for construction of an energy substation and several potential sites for transmission lines to and from the sites in the Cities of Rialto, Rancho Cucamonga, and Fontana and unincorporated San Bernardino County. Amber conducted general plant and wildlife surveys and assisted with vegetation mapping and special status plant surveys. Amber assisted in the preparation of a Biological Technical Report that analyzed potential project impacts on biological resources. Issues analyzed included potential impacts on special status plant species (including Parry’s spineflower), coastal California gnatcatcher, western burrowing owl, Los Angeles pocket mouse, and San Bernardino kangaroo rat.

Integra Perris Distribution Center (IPDC) EIR – Perris, CA: Amber was the Biological Task Manager for this project, which involves the construction of the IPDC. Additionally, she was the Biological Task Manager for the subsequent expansion of the IPDC to include an approximately 10.2-acre parcel located immediately southwest of the IPDC site. Amber oversaw the preparation of a Habitat Assessment, consistent with the Western Riverside MSHCP, that was used to support a Mitigated Negative Declaration and an update to the Habitat Assessment to support an Addendum for the expansion project. Amber managed field surveys including vegetation mapping, general plant and wildlife surveys, focused surveys for special status plants, and focused surveys for burrowing owl.

French Valley Parkway Interchange Biological Resources – Riverside County, CA:

Amber was the Biological Resources Task Manager for this project, which involves the construction of a new interchange and widening of I-5 and I-215 from Murrieta Hot Springs Road to Winchester Road. Amber mapped vegetation; conducted general wildlife surveys; and managed focused survey efforts for special status plants, least Bell’s vireo, burrowing owl, and Los Angeles pocket mouse. She was also the Lead Author on the Natural Environment Study and the Biological Resources section for the IS/MND; both were consistent with Caltrans standards.

Amber also provided biological technical support for the jurisdictional permitting process conducted by Psomas and she peer reviewed the Determination of Biologically Equivalent or Superior Preservation Report prepared by Caltrans.

In addition, Amber managed a Los Angeles pocket mouse trapping program on several potential mitigation sites in order to find a mitigation site occupied by Los Angeles pocket mouse that could mitigate for the project’s impacts.

Lakeview Substation Project, Proponent’s Environmental Assessment, Biological Technical Report and Focused Surveys – Riverside County, CA:

Biologist for this SCE’s project, which involves multiple potential sites for construction of an energy substation and several potential sites for transmission lines to and from the sites in Lakeview, Nuevo, and unincorporated Riverside County. Amber assisted with special status plant surveys. As part of this task, Amber took detailed field notes, mapped locations of special status species observed, and assisted in the preparation of the report presenting the results of the survey.

Amber Heredia
(Continued)
A-15Client Name | Project NamePage 1020 of 1311

A-16City of Beaumont
On-Call Planning and Environmental Services
Darlene Yellowhair, PE, PTOE, RSP2i, ENV SP – Psomas
Traffic Engineer
Darlene has over 17 years of extensive experience with a variety of traffic engineering projects, including traffic impact studies, traffic reports, safety studies, signal warrant studies, corridor studies, signal timing and coordination, signing and striping design, and traffic signal design. She also has experience with design and studies for alternate modes of travel, Road Safety Assessments, transportation planning, and roadway design. Darlene is well-versed in Synchro, SimTraffic, HCS, SIDRA, and GIS, and has experience with AutoCAD, MicroStation, and InRoads.

Experience
Mt. San Antonio College, Parking and Circulation Master Plan – Walnut, CA:

Traffic Engineer provided professional services to improve parking and circulation opportunities on campus. The College had significant concerns about their parking capacity and needed a new master plan to evaluate the existing parking and transportation network within the college, identify deficiencies or areas of improvement, determine needs to serve future growth, estimate the approximate cost of the recommended improvements, and prioritize the recommended facilities. Specific tasks of this study included the review of relevant technical documents/information, inventory of existing conditions, parking survey and summary of findings, evaluation of future needs (2025), conceptual development of transit center, identification and prioritization of recommended improvements, report preparation, meetings and coordination, stakeholder meetings/workshops, Traffic Impact Study, and evaluated future needs beyond 2025.

Perris Senior Housing Project – Perris, CA: Traffic Engineer Darlene was responsible for the traffic analysis, including the development of projected traffic volumes, analysis of existing and future operations, and review of school circulation and recommendations.

Mt. San Antonio College, 2018 Educational and Facilities Master Plan EIR – Walnut, CA: Lead Traffic Engineer for implementation of the 2018 Educational and Facilities Master Plan, which serves as Mt. SAC’s long-range development plan, over a 10-year horizon period. The plan was evaluated in the EIR at a program level with the expectation that additional analyses may be required as specific projects are proposed. In addition to the EIR, Psomas also prepared technical analyses to support the EIR, including air quality, biological resources, cultural and tribal resources, greenhouse gas emissions, hydrology and water quality, and traffic analyses. Darlene prepared a traffic study to support the EIR.

University of California, Riverside, Student Success Center IS/MND – Riverside, CA: Traffic Engineer for the preparation of an IS/MND’s Student Success Center, a new 3- to 4- story facility with a maximum building capacity of 80,000 GSF, and approximately 1,070 general assignment classroom seats. The project would provide 1) general assignment classrooms designed for modern pedagogy and technology; 2) multipurpose student life spaces for use by student organizations

REGISTRATION
2009/AZ/Professional
Engineer/Civil/50215
2017/CA/Traffic
Engineer/2827

EDUCATION
2006/MS/Civil
Engineering/Cornell
University
2004/BS/Civil
Engineering/University
of Arizona

CERTIFICATIONS
Road Safety
Professional/
Transportation
Professional
Certification Board
Inc./169
Envision Sustainability
Professional/Institute
for Sustainable
Infrastructure
Professional Traffic
Operations Engineer/
Transportation
Professional
Certification Board
Inc./3123
LEED Accredited
Professional/U.S. Green
Building Council

PROFESSIONAL

AFFILIATIONS
Institute of
Transportation
Engineers
American Society of Civil
Engineers

EXPERIENCE
With Psomas for 17 years
A-16Client Name | Project NamePage 1021 of 1311

A-17City of Beaumont
On-Call Planning and Environmental Services
and areas for scholarly activity such as tutoring, mentoring, and study; and 3) (shelled) dining services venue. The IS/MND was tiered from UCR 2005 Long- Range Development Plan EIR and the 2005 Long-Range Development Plan Amendment 2 EIR. Darlene was responsible for the traffic evaluation memorandum for this project, coordination with the City of Riverside, and support for the IS/MND.

University of California, Riverside, School of Medicine Building II IS/MND – Riverside, CA: Traffic Engineer for preparation of a tiered IS/MND. The project involves construction of a new facility consisting of instructional, collaboration, and student life space, as well as office and support spaces. The project would be located in an area currently developed as a surface parking lot and the School of Medicine modular trailer. The IS/MND was tiered from the UCR 2005 Long Range Development Plan EIR and the 2005 Long Range Development Plan Amendment 2 EIR.

Glendale Boulevard/Hyperion Avenue Complex of Bridges Traffic Study – Los Angeles, CA: Staff Team in the collection, compilation, and development of a traffic studies for six bridges, including the Waverly Drive Bridge, that connect the communities of Atwater Village and Silver Lake. As the bridges cross the Los Angeles River, I-5 Freeway and Riverside Drive, they provide vital links for the communities. The completed traffic studies consist of existing and future vehicular, pedestrian and bicycle volumes, speed, median barrier, operational analysis, pedestrian crosswalk and cross-section alternatives. Psomas also provided a speed study, analysis of potential median treatments, operational analyses of various alternatives, evaluation of pedestrian crossing location and traffic control, and an assessment of cross-sectional elements.

Berkshire Creek Area Improvements Project IS/MND – Pasadena, CA: Traffic Engineer for this IS/MND, which would improve the ecological, hydrological, and recreational conditions for approximately 4.7 acres within the Oak Grove area of the approximate 1,300-acre Hahamongna Watershed Park. The project would replace damaged storm water infrastructure to stabilize the heavily degraded Berkshire Creek, construct a 50-foot timber bridge, fill in the eroded channel, and restore habitat to create sustainable long-term hydrologic conditions as well as eliminate flooding on the service road and the Berkshire Creek trail crossing.

In the nearby equestrian picnic area, the asphalt paving would be removed and replaced with a permeable material within a smaller footprint that continues to provide adequate parking in this area. The southernmost portion of the existing asphalt lot would be converted to a native meadow garden. Within in the remainder of the site, the project would implement oak woodland and California sage scrub habitat restoration. Psomas also prepared the Jurisdictional Delineation Report, Biological Technical Report, Cultural Resources Assessment, and Traffic Evaluation Memorandum, and habitat restoration specifications for the project. 2nd Street and Pacific Coast Highway Signal and ITS Design – Long Beach, CA:

Traffic Engineer to provide preliminary engineering services for this 10-acre resort community area that features a mix of upscale lifestyle tenants, restaurants, entertainment, local shops, and a gourmet grocery. The scope of services included engineering planning, entitlements, EIR engineering support, and ALTA survey mapping.

Darlene Yellowhair, PE,
PTOE, RSP2i, ENV SP
(Continued)
A-17Client Name | Project NamePage 1022 of 1311

A-18City of Beaumont
On-Call Planning and Environmental Services
David Brotchie, PE, QSD, LEED AP – Psomas
Hydrology/Water Quality Engineer
David Brotchie has over 28 years of experience in the planning, design, and construction of civil engineering projects for both the public and private sectors.

His project experience includes design and development of roadways, commercial projects, master planning of residential subdivisions, stormwater management, and flood control. David’s hydrology and hydraulic experience has focused on civil works infrastructure projects including levee, floodwall design, drainage master plans and studies, and USACE Periodic Inspection for flood protection systems in California, Iowa, and New Orleans.

Experience
University Village, University of Redlands – Redlands, CA: Project Manager for a 30-acre mixed use Transit Oriented Development centered around the new SBCTA Arrows Line passenger rail serving University Station and University of Redlands.

The project includes 1 million sf of residential, 150,000 SF of commercial, and a 70-key hotel. Effort to date includes land use entitlement/CEQA , and concept design for grading, utilities, drainage, Low Impact Development/water quality, roadway and floodplain analysis.

Iowa Avenue Mixed-Use – Riverside, CA: Project Manager for a 295-unit garden style market rate apartment complex with four-four story buildings located near the intersection of Blaine Street and Iowa Avenue. The project will be parked with a combination of tuck under garages and surface parking. The existing site is a former K-mart that will be demolished. Within the property there are also an operating Stater Bros. Markets and Jack in the Box. Site design elements include site ADA accessibility, grading, drainage, utility, and Low Impact Development/ Water Quality design and Water Quality Management Plan.

Centerpointe Apartments – Riverside, CA: Project Manager for a 125-unit apartment complex and an associated parking structure in the city block of Market Street between First and Second Streets within the Downtown Specific Plan. Site design elements include site ADA accessibility, grading, drainage, utility, and Low Impact Development/Water Quality design and Water Quality Management Plan. Construction services included SWPPP monitoring and BMP inspections.

Avenue R Complete Streets and Safe Routes to School – Palmdale, CA: Project Manager for providing environmental clearance and developing construction documents for infrastructure enhancements to accomplish a “Complete Streets” approach along Avenue R from Sierra Highway to 25th Street East. Psomas prepared a full range of technical studies (Natural Environmental Study, Draft Relocation Impact Statement, Community Impact Assessment memo) in support of the IS/EA on an expedited schedule due to the use of federal funding sources.

Design included Street, Drainage, Traffic Signals, Class 2 Protected Bikeway, and right-of-way acquisition.

REGISTRATION
2001/CA/Professional
Engineer/Civil/62005
2012/HI/Professional
Engineer/Civil/15128

EDUCATION
1995/BS/Civil
Engineering/California
State University, San
Jose

CERTIFICATIONS
LEED Accredited
Professional/U.S. Green
Building Council
Qualified SWPPP
Developer/Stormwater
Multiple Application and
Report Tracking System/
C62005

EXPERIENCE
With Psomas for 13
years; with other firms
for 15 years*
A-18Client Name | Project NamePage 1023 of 1311

A-19City of Beaumont
On-Call Planning and Environmental Services
Arlington Avenue Apartments – Riverside, CA: Project Manager for a 17-acre mixed use development including a 400-unit apartment and grocery development. The existing site is a former Sears at the intersection of Arlington Avenue and Streeter Avenue which will be demolished. Design included grading, drainage, utility, and Low Impact Development/Water Quality design and Water Quality Management Plan.
*Four Seasons Ko Olina Renovation – Oahu, HI: Project Manager and Resident Engineer for site grading and utility infrastructure renovation for the 19-acre resort from entitlements through construction.
*Lualualei Flood Mitigation Study – Waianae, HI: Project Manager and lead report writer for a flood mitigation study covering a 22-square mile drainage basin. The study recommended a lower level of mitigation to the $110M estimated cost for full mitigation to be within possible capital improvement budgets. The final study included conceptual plans based on hydrology and hydraulics developed as part of the project as well as public, agency, and elected official outreach. *Morrison Creek Floodwall at Union Pacific Railroad, South Sacramento Streams Flood Damage Reduction Project – Sacramento, CA: Project Manager and lead designer for flood protection improvements along the Union Pacific Railroad from the confluence of Morrison Creek and Unionhouse Creek. Project improvements included a 2,850-foot length of reinforced concrete floodwall, 930 feet of retaining walls, levee embankment sections, patrol road, drainage facilities, utility relocations and stoplog structures to accommodate the active Union Pacific Railroad facilities.
*USACE Kwajalein Installation Design Guide – Marshall Islands: Civil Engineering Lead for a complete update of existing army garrison design guide included circulation, utilities, and low impact for all areas of the base including the airfield, commercial, residential, and base operations. *NAVFAC Naval Special Warfare – Pearl Harbor, HI: Project Manager for preparing deign build RFP documents for the expansion of the Seal Delivery Vehicle Team headquarters at Pearl Harbor. Project included circulation, LID, water and sewer improvements.
*FY14 Improve Military Family Housing (MFH) Infrastructure, Phase 3, Kadena Airbase – Okinawa, Japan: Managed all aspects of the A-E design team to prepare construction documents to improve Military Family Housing (MFH) Infrastructure, Phase 3, Kadena AB and Camp Foster, Okinawa, Japan with an estimated construction cost of $18M. The civil engineering design included replacement of water and sewer distribution for the MFH neighborhoods.

The electrical engineering design included primary and secondary electrical distribution and street lighting. Special considerations were required to address hazardous materials and protect cultural assets.

David Brotchie,

PE, QSD, LEED AP
(Continued)
A-19Client Name | Project NamePage 1024 of 1311

A-20City of Beaumont
On-Call Planning and Environmental Services
Matthew Cohrt , PG, CEG – Sladden Engineering
Geologist/Hazardous Materials Engineer
Matthew Cohrt brings 20 years of experience that includes all aspects of geology. Matthew has been involved in a variety of projects including residential developments and various commercial and industrial developments. Matthew’s experience includes seismicity evaluation, exploratory trenching and fault studies, slope stability evaluation, geologic mapping, rolling boulder and or rock fall hazard evaluations, ground subsidence studies, laboratory testing and computer analyses.

As a Geologist with Sladden Engineering, Matthew designs and performs geologic site evaluations including borehole logging and sampling, geologic mapping, fault and seismic studies. He coordinates and performs the geologic studies including related research and investigation of potential geologic hazards. Geologic hazards routinely evaluated by Matthew include fault hazards, ground shaking potential, liquefaction potential, landslide or rockfall potential and ground subsidence potential. He determines the laboratory testing program, performs engineering analysis of laboratory data, prepares graphic presentations of test data and provides design parameters for various site conditions.

Experience
Fault Hazard Investigation, Dr. Brian Bearie, M.D., SWC Oak Valley Parkway and Beaumont Avenue – Beaumont, CA: Principal Geologist/Engineering Geologist; Beaumont Plain Fault trench investigation consisted of reviewing published and unpublished geologic and geotechnical literature, review of LiDAR imagery for the project site and excavating one exploratory fault trench. Geologic evaluation and logging of approximately 219 linear feet of trench to evaluate active faulting potential on the subject property.

Supplemental Rockfall Hazard Analysis, Michael Baker International, Silverrock Golf Course Resort – La Quinta, CA: Principal Geologist/Engineering Geologist; supplemental evaluation of the site consisted of reconnaissance level geologic mapping, geologic evaluation, kinematic analyses of select bedrock areas, rockfall hazard analyses and evaluation of bedrock discontinuities with respect to potential plane and wedge type failures. Rockfall protection recommendations consisted of earthen berms in conjunction with catchment ditches.

Geotechnical Investigation, Weber Metals - 16706 Garfield Avenue – Paramount, CA: Principal Geologist; geotechnical investigation for forging press building including a subterranean press pit approximately 80 feet in depth. The field investigation consisted of a total of eight (8) exploratory bores that were excavated utilizing a truck mounted hollow stem auger rig (Mobile B-61) and a mud rotary drill rig (Fraste MD/XL). In addition, four (4) CPT soundings were performed. Provided recommendations for press pit design, shoring system design and dewatering.

REGISTRATION
2009/Professional
Geologist/CA/No. 8567

EDUCATION
BS/Geology/Sonoma
State University

CERTIFICATIONS
Certified Engineering
Geologist/No. 2634

PROFESSIONAL AFFILIATIONS
Association of
Environmental and
Engineering Geologists
(AEG)
The Association of
Geohazard Professionals
(AGHP)

EXPERIENCE
With Sladden
Engineering for 18 years;
with other firms for 2
years
A-20Client Name | Project NamePage 1025 of 1311

A-21City of Beaumont
On-Call Planning and Environmental Services
Matthew Cohrt, PG, CEG
(Continued)
Phase 1 Environmental Site Assessment, EDSA – Hyatt Regency Resort and Spa – Indian Wells, CA: Principal Geologist/Engineering Geologist; Phase I Environmental Site Assessment of water park amenities proposed for the Hyatt Regency Hotel and Spa complex. The intent of this investigation was to evaluate areas of potential environmental concern that may be present as a result of past hazardous materials use, handling or storage on or near the property with respect to the range of contaminants within the scope of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and petroleum products for a parcel of commercial real estate.

Results of Shallow Soil Sampling (Phase II), Kraemer Land Company, Inc. – Avenue 50 East of Jefferson Street – Indio, CA: Principal Geologist/Engineering Geologist; shallow soil sampling was intended to evaluate soil conditions throughout the property with respect to California Environmental Protection Agency (CalEPA) California Human Health Screening Levels (CHHSLs) relating to potential risk to human health. The project site was divided into 54 quadrants and samples were collected from each quadrant at depths between six (6) and twelve (12) inches below the existing ground surface, consistent with CalEPA guidance.

A-21Client Name | Project NamePage 1026 of 1311

A-22City of Beaumont
On-Call Planning and Environmental Services
Charlene So, TE – Urban Crossroads, Inc.

Traffic/Transportation Engineer
Charlene So, TE, has worked in transportation planning and traffic engineering since 2002. Since earning her Bachelor of Science degree in Civil Engineering from the University of California, Irvine, Charlene has developed a wide range of expertise in transportation planning and traffic impact analyses. She is a registered professional traffic engineer in the state of California. Charlene is an experienced project manager leading the traffic group and traffic engineer who is familiar with the analysis techniques of the most current Highway Capacity Manual. She is proficient in the use of unique analysis software tools such as SYNCHRO, SimTraffic, VISSIM, VISTRO, and HCS.

Experience
Highland Springs and 8th Retail, Lilburn – Beaumont, CA: Associate Principal for this project which consists of 3,500 SF of fast-food restaurant uses with a 12-vehicle fueling position gas station located south of 8th Street and west of Highland Springs Avenue. The Traffic Study evaluated nine intersections.

Falloncrest, Distinguished Homes – Chino, CA: Associate Principal for this project which consists of 698 condo/townhomes, 440 apartment units, 77,597 SF of general office use, 77,597 SF of shopping center use, and 17.3 acres of park use located north of Pine Avenue and east of W. Preserve Loop. The Traffic Study evaluated 56 intersections.

Fullerton Goodman Logistics Center, Goodman Logistics – Fullerton, CA:

Associate Principal for this project which consists of 1,561,522 SF of high-cube warehouse space located north of Orangethorpe Avenue and west of N. State College Boulevard. The Traffic Study evaluated 32 intersections and 16 freeway facilities.

Merrill Commerce, Prologis – Ontario, CA: Associate Principal for this project which consists of 6,312,000 SF of high-cube fulfillment center warehouse use, 701,400 SF of high-cube cold storage warehouse use, and 1,441,000 SF of business park use located north of Merrill Avenue and east of Grove Avenue. The Traffic Study evaluated 68 intersections and 34 freeway facilities.

South Campus, Meridian Park, LLC – March Joint Powers Authority, CA: Associate Principal for this project which consists of 1,774,437 SF of warehousing uses, 1,764,180 SF of business park use, 388,011 SF of office use, 282,730 SF of shopping center use, and a 6.2-acre dog park located south of Van Buren Boulevard and east of Barton Street. The Traffic Study evaluated 47 intersections and 24 freeway facilities.

REGISTRATION
2006/CA/Registered
Professional Traffic
Engineer/TR 2414

EDUCATION
2004/BS/Civil
Engineering/University
of California, Irvine

PROFESSIONAL

AFFILIATIONS
Institute of
Transportation
Engineers (ITE) Member
National Association of
Industrial and Office
Properties (NAIOP)
Member

EXPERIENCE
With Urban Crossroads
for 19 years; with other
firms for 2 years
A-22Client Name | Project NamePage 1027 of 1311

1650 Spruce Street
Suite 400
Riverside, CA 92507
951.787.8421
www.Psomas.com

Page 1028 of 1311 ends

Balancing the Natural and Built Environment
March 16, 2023
Grace Wichert
Procurement and Contracts Specialist
City of Beaumont
550 E. 6th Street
Beaumont, CA 92223
Subject: Cost Proposal for On-Call Planning and Environmental Services Dear Ms. Wichert:

Per the instructions of the RFP, we have provided this cost proposal under separate cover. The following pages include hourly billing rates of Psomas and our subconsultants.

As a Vice President and Principal of Psomas, I, Jennifer Marks, am authorized to bind Psomas contractually. This cover letter constitutes certification, under penalty of perjury, that Psomas complies with nondiscrimination requirements of the State and Federal Government. We acknowledge and confirm receipt of Addendum No. 1, issued on March 7, 2023. If you need additional information or have any questions, please contact me by phone at 714.481.8041 or email at [email protected].

Sincerely,

Jennifer Marks Charles Holcombe III, MBA
Vice President/Principal-in-Charge Project Manager
1650 Spruce Street
Suite 400
Riverside, CA 92507
Tel 951.787.8421
www.Psomas.comPage 1029 of 1311

2City of Beaumont
On-Call Planning and Environmental Services

2023 FEE SCHEDULE
Environmental Services
(Effective through 12/31/2023 and
Subject to a 3 percent Annual Escalation)
Classification Hourly Billing Rates
Principal-in-Charge $247–$273
QA/QC Manager $221–$273
Air Quality, Climate Change and Noise Manager $2 30
Regulatory Permitting Manager $216
Senior Project Manager, Environmental $189–$240
Senior Environmental Planner $152 –$201
Senior Restoration Ecologist $173–$196
Senior Project Manager/Biological Resources Manager $173–$221 Senior Archaeologist/Paleontologist $147 –$165
Project Manager1 $142 –$184
Environmental Planner $137 –$163
Regulatory Permitting Specialist $134 –$173
Senior Field Technician2 $147 –$173
Certified Arborist $129–$173
Assistant Project Manager, Environmental $116–$158
Senior Biologist/Senior Ecologist $147 –$158
Air Quality, Climate Change, and Noise Specialist $147 –$201 Environmental Analyst $105 –$142
Biologist $124 –$142
Archaeologist/Paleontologist $95 –$131
Field Technician2 $95 –$131
GIS Manager $152 –$163
Senior GIS Analyst $126–$152
GIS Specialist $100–$121
Graphic Artist $105 –$131
Technical Writer/Editor $100 –$126
Word Processor $105 –$126
Project Assistant/Administrative Assistant $84–$105
Reimbursable Costs
Mileage Federal Standard Mileage Rate
Reprographics (Outside) at cost plus 10%
Reprographics (Inside) Request Printing fee sheet
Other Out-of-pocket Expenses at cost plus 10%
Subconsultants at cost plus 10%
Plotting:

Color Bond $1.50 per sq ft
Color Photo Gloss $2.50 per sq ft
Aerial Maps: Fewer than 500 acres $200
Aerial Maps: 500–1,500 acres $350
Aerial Maps: Greater than 1,500 acres $500

1 Environmental Planning, Biological Resources and Cultural Resources 2 Air Quality/Climate Change/Noise Analysis, Biological Resources, and Cultural Resources 2Client Name | Project NamePage 1030 of 1311

3City of Beaumont
On-Call Planning and Environmental Services

● Indio ● Beaumont ●Buena Park 2023-Schedule of Fees rev 23.1

2023 SCHEDULE OF FEES

GENERAL SCOPE OF SERVICES
Sladden Engineering provides professional services in the field of soil mechanics, geology, foundation design and earthwork engineering in accordance with generally accepted practices at the time of service. No warranty, either expressed or implied, is granted as a part of the performance of our work. Sladden Engineering does not provide services related to construction safety and shall be held harmless from any liability related to safety issues.

In the event that the client requests termination of work prior to completion, we reserve the right to complete (at the client's expense) any analysis or testing considered necessary to complete our records and protect our professional reputation.

PROFESSIONAL SERVICES
Principal Engineer/Geologist ...................................................................... $250.00 per hour Principal Engineer/Geologist (Expert Witness) ........................................... $500.00 per hour Project Engineer/Geologist ......................................................................... $175.00 per hour Staff Engineer/Geologist ............................................................................. $150.00 per hour

TESTING AND INSPECTION SERVICES
Soil Technician ........................................................................................... $110.00 per hour Senior Soil Technician .………………………………………………………....$120.00 per hour Soil Technician – Prevailing Wage ............................................................. $130.00 per hour Deputy Grading Inspector ........................................................................... $120.00 per hour Special Inspection ....................................................................................... $110.00 per hour Special Inspection – Prevailing Wage ........................................................ $130.00 per hour Administration/Secretarial .......................................................................... $85.00 per hour Report Preparation .................................................................................... $100.00 per hour Travel Time …............................................................................................ $110.00 per hour

TESTING AND INSPECTION SERVICES
Soil Technician ........................................................................................... $165.00 per hour Soil Technician – Prevailing Wage ............................................................. $195.00 per hour Special Inspection ....................................................................................... $165.00 per hour Special Inspection – Prevailing Wage ........................................................ $195.00 per hour Deputy Grading Inspector ........................................................................... $180.00 per hour Travel Time …............................................................................................ $165.00 per hour

*5:00PM – 7:00AM

** Sunday and Holidays Double Time

Minimum Charges: A minimum of two hours will be charged for field testing and show up time even if no testing is performed. Reimbursable expenses incurred will be billed at cost plus 15%.

Cancellation Charges: A minimum of four hours at the applicable billing rate will be charged for cancellations received within 12 hours of scheduled testing/inspection.

Sladden Engineering

45090 Golf Center Parkway, Suite F, Indio, CA. 92201 (760) 863-0713 6782 Stanton Avenue Suite C, Buena Park, CA 90621 (714) 523-0952 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743
www.Sladdenengineering.com
3Client Name | Project NamePage 1031 of 1311

4City of Beaumont
On-Call Planning and Environmental Services

● Indio ● Beaumont ●Buena Park 2023-Schedule of Fees rev 23.1

Sladden Engineering

LABORATORY TESTING (ASTM / CALTRANS) & FIELD SERVICES
Maximum Density/Optimum Moisture (ASTM 1557 - Method A) ................ $150.00 per test Maximum Density/Optimum Moisture (ASTM 1557 - Method C) ................ $175.00 per test Maximum Density/Optimum Moisture (California Impact) ........................... $175.00 per test Maximum Density/Theoretical (Reis Method) .............................................. $125.00 per test Sieve Analysis (without 200 wash) ............................................................. $100.00 per test Sieve Analysis (with 200 wash) ................................................................... $120.00 per test Expansion Index (UBC 18-2) ....................................................................... $135.00 per test R-Value Determination ................................................................................ $275.00 per test Sand Equivalent (Average of three) ............................................................. $110.00 per test Liquid Limit .................................................................................................... $75.00 per test Plastic Limit ................................................................................................... $75.00 per test Plasticity Index (Liquid limit & Plastic limit) ................................................. $140.00 per test Direct Shear Test ........................................................................................ $225.00 per test Marshall Max A/C/HVEEM Max ................................................................... $180.00 per test Soluble Sulfate Content Determination ......................................................... $60.00 per test Resistivity Testing .......................................................................................... $85.00 per test Corrosion Series Determination ................................................................... $160.00 per test Asphalt Extraction Gradation ....................................................................... $185.00 per test Concrete, Grout, Mortar Compression Tests……………………………………$35.00 per test Coring and Shotcrete Compression Tests .................................................... $35.00 per test Lab Technician Sample Preparation ........................................................... $89.00 per hour Excavator with Operator ............................................................................ $150.00 per hour

**Prices subject to a 2.5% annual increase.
**Any increase to the State wide general prevailing wage determination will be added to the above listed prevailing wage rate.

4Client Name | Project NamePage 1032 of 1311

5City of Beaumont
On-Call Planning and Environmental Services
Position Hourly Rates
Principal $295
Senior Associate $225
Associate $185
Senior Analyst/Engineer $155
Analyst/Engineer $125
Assistant Analyst $115
Administrative Support $105
Hourly Billing Rates
Fixed rates that are valid for the three-year duration of the contract (2023 to 2026) General
(1) Reimbursable direct costs, such as reproduction, supplies, and messenger service will be billed at cost.
(2) Hourly rates apply to work time, travel time, and time spent at public hearings and meetings. For overtime work, the above rates may be increased 50 percent. (3) Monthly billing statements are due within thirty (30) days of receipt. 5Client Name | Project NamePage 1033 of 1311

On-Call Planning
and Environmental
Services

CITY OF BEAUMONT
1650 Spruce Street, #106 | Riverside, CA 92507
(951) 787-9222 | www.migcom.com

In association with: Fehr & Peers
Proposal | March 16, 2023

Page 1034 of 1311 ends
Page 1035 of 1311 ends

PLANNING / DESIGN / COMMUNICATIONS / MANAGEMENT / TECHNOLOGY / SCIENCE 1650 Spruce Street, #106
Riverside, CA 92507
(951) 787-9222
www.migcom.com

CALIFORNIA

BERKELEY, FULLERTON,

LOS ANGELES, PASADENA,

RIVERSIDE, SACRAMENTO,

SAN DIEGO, SAN JOSE,

AND SONOMA

COLORADO
DENVER

NEW YORK

BROOKLYN
OREGON

PORTLAND
TEXAS

SAN ANTONIO

WASHINGTON

SEATTLE
March 16, 2023
City of Beaumont
c/o Grace Wichert
550 E. 6th Street
Beaumont, CA 92223
Subject: Proposal for On-Call Environmental Planning Services for the City of Beaumont
Dear Ms. Wichert and Selection Committee Members:

MIG, Inc., is pleased to submit our proposal and qualifications to the City of Beaumont (City) to provide on-call California Environmental Quality Act (CEQA) compliance services. MIG has a 40-year track record of working interactively with our public and private clients, becoming an extension of their staff.

Our environmental team has prepared and reviewed hundreds of CEQA documents and associated technical studies. MIG offers a full range of environmental services that are provided by seasoned CEQA practitioners and technical subject matter experts. Our highly capable environmental professionals and subconsultants have analyzed all manner of environmental projects throughout California and the County of Riverside. Our environmental staff also performs mitigation monitoring, field monitoring, and related services.

From our local office in Riverside, our environmental staff are accessible and can quickly respond to the consulting needs of the City. Director of Environmental Services Bob Prasse has extensive experience with all types of environmental projects, including industrial parks and warehouses, large-scale mixed-use developments, General Plans, Specific Plans, “big box” commercial centers, and transit-oriented development along the Metro Gold Line. He also has considerable experience in providing third-party peer review services for environmental documents.

Our proposal has been organized in accordance with the requirements of the Request for Proposal (RFP). We look forward to helping the City of Beaumont ensure that the environmental impacts of projects are thoroughly and cost-effectively addressed in a manner tailored specifically to the City’s vision and standards.

As Principal-in-Charge, I am authorized to represent MIG, negotiate on its behalf, and bind MIG to all commitments made in our proposal. If you have any questions, please feel free to contact Bob Prasse or me at 951-787-9222, or email us at [email protected] or [email protected].

Sincerely,
Pamela Steele
Principal-in-Charge, MIG, Inc.

Page 1036 of 1311 ends

TABLE OF CONTENTS
Introduction / Information 3
Approach 5
Firm Profile/Principal Office 7
Proposed Team 8
References 11
Scope of Services 16
Additional Information 21
Insurance 22
Appendix - Resumes 23
Cost Proposal Under Separate Cover

Page 1037 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 3 Introduction / Information
Firm Overview
MIG is a multidisciplinary firm that provides
environmental, planning, design, management,
communications, and technology services
to public and private agencies throughout
California and the United States. We develop
innovative planning and design solutions
through a highly interactive and participatory
process. We specialize in CEQA compliance,
environmental and ecological planning,
community design, landscape architecture,
park and recreation planning, urban planning,
and entitlement. MIG has successfully
assisted public and private agencies with their
environmental needs, engaging communities,
stakeholders, and decision-makers in planning,
policy, and design projects. We offer a full
range of planning and environmental services
and assist in creating innovative environments
that:
»Promote environmental stewardship and
sustainability;
»Honor the community’s history and natural
environment;
»Contribute to neighborhood and community
identity;
»Foster a sense of place;
»Promote public safety;
»Facilitate intergenerational recreation
opportunities;
»Meet maintenance and program needs; and
»Support revenue-generating goals.

Our work is characterized by a dedication to
quality; a flexible approach; compliance with
City, State, and Federal requirements; creativity
in planning and design; and a commitment to
completing projects on time and within budget.

Since its founding in 1982, MIG has grown to be
a strong team of over 260 employees.

Statement of Understanding
MIG understands the City of Beaumont is
seeking a qualified consultant to provide
on-call environmental planning services to
support City staff in relation to CEQA, including
preparation of an array of environmental
documents, assistance with the consultation
process, and coordination with City staff
during the CEQA public review process. We
understand the City has expanded substantially
over the last several years, and that future
development projects will require the
preparation of CEQA documents.

Our approach focuses on practical problem-
solving, recognizing that while CEQA
documents largely serve a public disclosure
purpose, they can also work to make projects
better and improve environmental conditions.

MIG achieves the objectives of its on-call
environmental services work by adhering to the
following three principles:
»First, the methodology and content are
consistent with the most current CEQA
statutes, guidelines, and case law;
»Second, mitigation recommendations are
realistic and feasible; and
»Third, findings are effectively presented
through clear and concise writing, informative
graphic design, and skillful oral presentation.

These principles result in legally sound CEQA
documents that fully and clearly inform the
public, decision-makers, and interested
agencies.

Page 1038 of 1311 ends

4 City of Beaumont | On-Call Planning and Environmental Services Primary Contacts:

Pamela Steele, Principal
Riverside Office
1650 Spruce Street, #106
Riverside, CA 92507
951-787-9222, ext. 8360
[email protected]
Bob Prasse, Director of Environmental
Services/Primary Liaison
Riverside Office
1650 Spruce Street, #106
Riverside, CA 92507
951-787-9222, ext. 8020
[email protected]
The diversity of our staff bridges technical
expertise and values and facilitates the
exchange of information between all parties
engaged in the planning and design process.

Staff backgrounds include environmental
analysis, urban and regional planning,
landscape architecture, public participation,
communications, graphic design, and public
policy.

AREAS OF EXPERTISE
»Contract Planning (On-site and On-call)
»Environmental Services (CEQA/NEPA)
»Technical Services Including Air Quality and
Climate Change Analysis, Energy Analysis,
Health Risk Assessments, Biological
Resources Analysis, Acoustical and Vibration
Analysis, Phase I Environmental Site
Assessments (for hazmat), and Visual Impact
Assessments
»Landscape Architecture & Ecological Design
»Land Planning
»General Plans/Development Codes/Specific
Plans
»Urban Planning & Design
»Geographic Information Systems
»Graphics/Visual Simulations and Analyses
»Entitlement Processing
»Contract Planning (On-Site and On-Call)

SUBCONSULTANT
Fehr & Peers – Traffic
Fehr & Peers is passionate about transforming
transportation consulting through innovation
and creativity. The firm derives inspiration by
partnering with communities to understand and
shape local transportation futures objectively
tailored to diverse needs. Clients trust Fehr
& Peers to help them overcome barriers and
uncertainty by combining advanced expertise
with curiosity, humility, and initiative to deliver
implementable, data-driven solutions that
reinforce community values.

With a focus on innovation, Fehr & Peers
differentiates itself by investing in research
and development to anticipate needs, explore
the unknown, and collaboratively imagine a
better future. The company’s culture of applied
innovation generates an appetite for new
and better ways of approaching problems,
motivates team members to explore emerging
transportation concepts and mobility trends,
and inspires the development of new analytical
tools and techniques.

As the firm grows, a steadfast commitment
to inclusive, local, and long-term community
relationships remains central to its core
philosophy. Many of the company’s client
relationships are decades long, built on years
of listening, understanding, collaboration,
and successful outcomes. Clients of Fehr &
Peers have appreciated the firm’s long-term
commitments to local communities, trusting the
team as their objective partner in transportation
since 1985. Together with the firm’s clients,
Fehr & Peers is motivated by shared success,
inclusive partnerships, and the positive impact
the company’s work has on the communities
it serves.

Fehr and Peers has worked with Beaumont for
years, supporting their General Plan Circulation
Element Update and EIR, and most recently
utilizing RIVCOM to provide grant metrics,
including VMT, in support of the Protrero
Boulevard Interchange.

Page 1039 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 5 Approach
Project Approach
MIG has successfully initiated, organized, and
managed a diverse array of planning and
environmental projects in Riverside County,
as well as many CEQA and NEPA documents
for Southern California cities and jurisdictions
throughout the entire state. Our staff has
a long and successful record working on
complex planning and environmental projects,
including tasks through on-call contracts
and third-party peer review of all types of
environmental documents. We understand the
unique project and staffing needs required
of on-call contracts, necessitating proactive
management, quickly formulating project
teams, and aligning expectations between the
client and the consultant.

Our experienced staff is capable of acting
as an extension of the Beaumont Planning
Department. We can coordinate project
and CEQA review, including the applicable
noticing and submittal requirements for
public disclosure and processes through
the State Clearinghouse and/or County.

Our staff is also experienced in making
presentations to Commissions, City Councils,
and community groups. Finally, our staff has
experience assisting with the SB 18 and AB
52 Native American consultation process. As
a multidisciplinary firm, our array of services
benefits clients; we can seamlessly integrate
our areas of expertise to support the specific
characteristics and unique environmental
challenges of each project.

Meeting On-Call Project Needs
MIG utilizes integrated project management
and accounting software to ensure that our
projects are completed on time and within
budget. We will work with City staff to expedite
the process of acquiring and managing new
assignments, thus ensuring project delivery,
quality control, and quality assurance, as well
as full capability and flexibility to provide the
appropriate services when needed.

Staff Availability
With over 260 people on staff, MIG is able to
advance multiple assignments simultaneously.

We have the personnel and resources to
accommodate new projects and to respond
to unexpected assignments. Our project
teams are assembled based on staff expertise
and capacity. The MIG staff assigned to any
project that may come from this on-call will
be committed for the duration of the project
and their current workload will not impact
their availability to successfully complete
the assignment. All our projects and staff
capacity are monitored and scheduled in
coordination with existing project workloads.

Weekly in-house firm-wide Management
Team meetings ensure a high level of
communication among project leaders and the
efficient allocation of personnel and other firm
resources. Additional meetings are held with
internal staff that frequently work together on
projects, in particular, our planning, design, and
environmental planning groups work closely to
ensure optimal allocation of staff to projects.

Page 1040 of 1311 ends

6 City of Beaumont | On-Call Planning and Environmental Services Quality Assurance/Quality Control
The Quality Assurance/Quality Control (QA/
QC) process begins with the preparation of
the scope of services and staff assignments.

The MIG project manager will closely match
staff skills and experience with each project
assignment. Once the City signs off on the
project description, scope of work, content, and
format of required technical studies, the project
manager will then have an internal kick-off
meeting to review the project assignments.

At this point, all staff will be provided clear
guidance on deliverables, and senior subject
matter experts are assigned to review
these deliverables prior to finalizing them
and sending them to the City. MIG’s project
manager will oversee all work products. The
project manager will regularly keep the City
and the applicant updated on the project's
progress. If potential issues start to develop,
the project manager will identify such issues
to the City and the applicant, and recommend
a corrective course of action before such
issues become problems. Following these QA/
QC procedures ensures that projects remain
on schedule and on budget, and that City
expectations are met. The project manager will
ensure QA/QC procedures are followed and, as
Principal-In-Charge, Pamela Steele is ultimately
responsible for oversight of these procedures
across all projects.

Budget and Schedule
Proactive project management and client
service are paramount to our success.

Our strategies for successful budget and
schedule control include: communication,
advance planning, and early establishment
(and communication) of agreed-upon scope,
budgets, milestones, and deadlines for each
task. This also takes into consideration report
and review cycles required by the City and
various other agencies and stakeholders. MIG’s
project managers carefully monitor project
costs and schedule on a regular basis to
meet the agreed-upon budget and milestone
deliverable due dates. In addition, MIG does
not overcommit our staff and will maintain
City projects as a high priority for designated
staff. Our streamlined project team will include
only essential staff in project execution.

Maintaining a streamlined project team helps
facilitate smoother project management,
simplify communications with clients and key
stakeholders, and control costs. We will create
an integrated working relationship with the City
and will provide you and the applicant with:
status updates regarding schedule and budget,
monthly progress reports, and regular informal
communication. We are proactive with our
clients in communicating project status, issues
to be resolved, the need for meetings, and
project updates and news.

Include this? it is what F&P sent over for approach.

Page 1041 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 7 Firm Profile
About MIG
MIG, Inc., improves, adapts, and creates
organizations, environments, and tools for
human development. We are a community
of designers, planners, engineers, scientists,
and storytellers who engage people in
creative problem solving and collective
action. We believe that the physical and social
environment around us have a profound
impact on our lives, and this belief shapes the
principles that guide our work:
»Communities can plan their own futures.
»The world needs an ecological perspective.
»Great projects work for everyone.
»Elegant design inspires new thinking.
»Every project presents an opportunity to
advance racial and social equity.
»All work must be context driven.

MIG is at the forefront of innovation. We
are leading local, regional, and national
planning and design initiatives to ensure
accessibility and equity; engage, educate,
and empower people through participatory
processes; facilitate strategy development
for social change; create playful and inclusive
communities; reimagine streets and repurpose
infrastructure; revitalize cities and restore
ecosystems; and promote environmental
stewardship by recognizing that the health
of the natural and built world is mutually
dependent.

For more than 40 years, MIG has served
public and private clients of every size and
jurisdiction—from single property owners
to city, county, and state governments to
regulatory agencies and developers—as
a full-service planning and environmental
consulting firm. Our dedicated staff has the
experience to guide clients in environmental
regulatory compliance, restoration design
and implementation, technical studies, and
climate action plans. As a complement to our
planning, design, and development services,
we bring critical information into the process,
and ultimately into key decisions impacting
feasibility, livability, and successful project
implementation. The breadth of our expertise is
unparalleled in state and federal environmental
analysis (CEQA, NEPA), technical studies (air
quality, biology, greenhouse gases, noise), and
peer review.

With our extensive background and
knowledge, we can prepare legally defensible
environmental documents, legally defensible
environmental documents and permit
applications, and industry-standard technical
studies for multiple project types and permit
situations, including infrastructure, residential,
commercial, institutional, industrial, recreation,
and mixed-use developments; as well as policy
initiatives such as specific and general plans,
and open space and habitat conservation
plans. Our approach is based on a thorough
understanding of guiding regulations; efficiency
and accuracy in data gathering and analysis;
and creativity and innovation in problem-
solving and mitigation.

Number of Professional Personnel:
260
Years in Business:
41 Type of Business Entity:

CA Corporation
Principal Office:
1650 Spruce Street, #106
Riverside, CA 92507
Additional Office Locations:

Berkeley (headquarters), Fullerton,
Pasadena, Los Angeles, San Diego,
San Jose, Sacramento, Denver,
San Antonio, Portland, Seattle

Page 1042 of 1311 ends

8 City of Beaumont | On-Call Planning and Environmental Services The members of the MIG Team were selected
based on their specialized capabilities and
interest in working on the variety of projects that
might be required by the City of Beaumont. This
team provides a depth of knowledge and unique
insights to help develop specific processes
and products for each assignment. For tasks
under this contract, our staff will be focused,
continuously involved, and supplemented by
the strategic addition of specialized staff at the
appropriate time, if the need arises.

Principal-in-Charge Pamela Steele will be
responsible for ensuring that your project goals
are achieved and that we provide high-quality
deliverables and superior client service.

Experienced Project Manager / Director of
Environmental Services Bob Prasse can
direct any environmental services project and
brings significant experience and knowledge in
environmental planning.

Bob has managed many successful complex
multidisciplinary projects that involved a variety
of in-house staff and subconsultants, as well
as multiple review agencies. He will bring this
wealth of experience and knowledge to any
project we may be awarded under this on-call
contract and will serve as the primary point of
contact with the City’s project manager.

Our team includes task order managers who
regularly manage teams in preparing and/
or reviewing CEQA/NEPA documents and
associated technical studies. MIG’s technical
experts provide the full range of qualifications
and experience to provide supporting studies
and documentation. Further, MIG’s firmwide
resources are available to the project team, so
that expertise in a variety of related fields are
just a call or an e-mail away.

Resumes for all proposed personnel, including
their background, education, and relevant
project experience are provided in the appendix.

Proposed Team

NAME / ROLE CREDENTIALS RELEVANT EXPERIENCE
Pam Steele
Principal-in-Charge
MIG
»University of California,
Riverside
»Brigham Young University,
Utah
»30 years of experience
offering a full range of
planning, environmental,
and development consulting
services to public agencies
and private-sector clients
»City of Cypress Assistant
Planning Director
»City of Canyon Lake
Planning Director
»City of Murrieta Planning Staff
»City of Diamond Bar
Consultant Staff
»City of Yucaipa Planning Staff
Bob Prasse
Project Manager /
Director of
Environmental Services
MIG
»MURP, University of Southern
California
»BA, Public Affairs (Urban
Planning), University of
Southern California
»Duke Realty, Alabama/Palmetto
Warehouse EIR, San Bernardino
County, CA
»City of Garden Grove Focused
General Plan Update (GPU) EIR,
Garden Grove, CA
»City of Whittier GPU EIR,
Whittier, CA

TEAM QUALIFICATIONS

Page 1043 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 9

NAME / ROLE CREDENTIALS RELEVANT EXPERIENCE
Cameron Hile
Senior Analyst
MIG
»MS, Urban and Regional
Planning, California State
Polytechnic University,
Pomona, CA
»MA, Political Science,
Colorado State University,
Fort Collins, CO
»BA, Political Science,
San Diego State University,
San Diego, CA
»Duke Realty Alabama/Palmetto
Warehouse EIR, San Bernardino
County, CA
»Whittier General Plan Update EIR,
Whittier, CA
»Costco Expansion Addendum,
Chino Hills, CA
»San Gabriel Valley Water Company
Plant M4 IS/MND, Montebello, CA
»Covina Town Center Specific Plan
EIR, Covina, CA
Kent Norton, AICP,
REPA
Senior Project Manager
MIG
»MS, Environmental Studies,
California State University,
Fullerton
»BA, Biology, California State
University, Fullerton
»American Institute of Certified
Planners (AICP)
»Registered Environmental
Property Assessor (REPA)
»Starpointe 6th Street Warehouse
MND, San Bernardino County, CA
»Memorial Park Master Plan MND,
Upland, CA
»Whittier General Plan Update EIR,
Whittier, CA
»Hemet Modular Home Factory
MND, Hemet, CA
Chris Dugan
Director of Air Quality
and Noise Services
MIG
»BS, Natural Resource
Management Cook College,
Rutgers University, New
Jersey
»Veterans Home of California,
Yountville Skilled Nursing Facility
EIR/EA, Yountville, CA
»San Mateo County Government
Center, Campus Development
Project EIR, San Mateo County, CA
Phil Gleason
Senior Analyst, Air
Quality and Noise
Services
MIG
»BS, Atmospheric Science,
University of California,
Davis, CA
»Smoky Hollow Specific Plan EIR, El
Segundo, CA
»Crowe Vincent Ave CEQA Analysis,
Azusa, CA
»Tustin Downtown Commercial Core
Plan Environmental Studies,
Tustin, CA
Kasey Kitowski
Air Quality and Noise
Analyst
MIG
»BS, Environmental Policy
Analysis and Planning from
University of California, Davis
»Costco Expansion IS/MND,
Addendum, City of Chino Hills, CA
»West Hollywood Climate Action
Plan Update and CEQA Review,
West Hollywood, CA
»Standard Works Project,
El Segundo, CA

Page 1044 of 1311 ends

10 City of Beaumont | On-Call Planning and Environmental Services

NAME / ROLE CREDENTIALS RELEVANT EXPERIENCE
Todd Easley
Director of Biology
MIG
»MS, Environmental
Management, Griffith
University, Australia
»BA, Environmental Studies,
Economics, University of
California, Santa Cruz, CA
»AA, Ventura College,
Ventura, CA
»Wetland Delineation
Certification (Richard Chinn
Environmental Training, Inc.;
Certificate No. 6425)
»Flat-tailed Horned Lizard
(FTHL) Authorization (Title 14)
»Natural Resource Services and
Habitat Enhancement for the
Department of Defense, Orange
County, CA*
»Rare Plant Inventory Surveys,
Marine Corps Base Camp
Pendleton, CA*
»Marblehead Coastal Bluff Biological
Surveys and Habitat Restoration,
San Clemente, CA*
*Work completed prior to joining MIG
Betty Kempton, PhD
Senior Biologist
MIG
»PhD, Botany, Claremont
Graduate University,
Clarement, CA
»Certification, Geographic
Information Systems (GIS),
California State University,
San Bernardino
»BS, Biology, California State
University, San Bernardino
»Wetland Delineation
Certification (Richard Chinn
Environmental Training, Inc.;
Certificate No. 6425)
»Flat-tailed Horned Lizard
(FTHL) Authorization (Title 14)
»North Hills Jurisdictional
Delineation, Brea, CA
»Valley State Route 60/Moreno
Beach Drive Interchange
Project Phase 2 (Burrowing Owl
Assessment, Natural Environmental
Study, MSHCP CA and DBESP,
Jurisdictional Delineation, and Water
Permitting), Moreno Valley, CA*
»Metropolitan Water District Mecca
Road Emergency Repairs Project,
Biological Monitoring, Mecca,
Riverside County and Coachella
Valley, CA*
*Work completed prior to joining MIG
Jason Pack, TE
Principal Traffic
Engineer
Fehr & Peers
»BS, Civil Engineering,
University of California, Davis
»Licensed Traffic Engineer,
State of California (TR2402)
»WRCOG VMT SB 743
Implementation Study, CA
»SBCTA SB 743 Countywide VMT SB
743 Implementation Phase I, CA
»SBCTA SB 743 Countywide VMT
SB 743 Implementation Phase II
(VMT mitigation bank/exchange
program), CA
Paul Herrmann, TE
Senior Traffic Engineer
Fehr & Peers
»BS, Civil Engineering,
California Polytechnic
State University, Pomona, CA
»Licensed Traffic Engineer, CA
(TR2797)
»Villages at Lakeview Traffic Impact
Study, Riverside County, CA
»Riverside Housing Element Traffic
Impact Study, CA
»Ontario Airport Cargo Facility EIR,
Ontario, CA
»Riverside County Arena TIA, Palm
Desert, CA

Page 1045 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 11 References

PROJECT DETAILS
Firm: MIG
Client: City of Commerce
Location: Commerce, CA
Reference: Sonia Griego,
Associate Planner
City of Commerce
2535 Commerce Way,
Commerce, California 90040
(323) 722-4805
[email protected]
Dates: 2017 - 2020
MIG was contracted to complete an Initial Study and Mitigated Negative Declaration for rehabilitation of AltaMed’s corporate headquarters in the City of Commerce, California. The project included conversion of the upper two floors of an existing self-storage building located at 2035 Camfield Avenue into office space, construction of a five-story parking structure located at 5401 Telegraph Road, and construction of a pedestrian footbridge connecting the fourth level of the new parking structure with the third floor of the existing self-storage building. Construction of the parking structure required demolition of an existing light industrial building located at 5401 Telegraph Road. The first floor of the existing public storage building was previously renovated with offices, training rooms, a wellness center, and café uses as part of Phase 1 and Phase 1A of the site rehabilitation. This project represented Phase 2 of the overall rehabilitation of the site.

AltaMed Camfield-Telegraph Rehabilitation Project

Page 1046 of 1311 ends

12 City of Beaumont | On-Call Planning and Environmental Services

PROJECT DETAILS
Location: Menifee, CA
Reference: Orlando Hernandez
Planning Manager
City of Menifee
29844 Haun Road
Menifee, CA 92586
951-723-3737
[email protected]
Dates: 2022 (1st contract) and
2022-present (2nd contract)
Menifee Villages Specific Plan Amendment EIR Addendum
The project includes a Specific Plan Amendment to transfer dwelling units between Planning Areas, add a new Planning Area, reduce the amount of commercial development capacity, and make revisions to definition of density designations. Under the City of Menifee’s on-call contract, MIG is in the process of preparing an EIR Addendum and peer-reviewing CEQA documents, specifically Western Riverside MSHCP Consistency Analyses and burrowing owl survey reports prepared by another biological consultant for the specific plan update. While peer-reviewing the reports prepared by the biological consultant, it was discovered that several vernal pools were undocumented in the report findings despite being visible in multiple photographs provided in the report. To confirm the findings in person, MIG’s Biologist was asked to visit the site with the City and the developer to identify the vernal pools present at the site. The vernal pools constitute Riparian and Riverine resources per the Western Riverside MSHCP.

After demonstrating to the City that sensitive resources were present, the City requested that MIG conduct protocol-level vernal pool surveys, perform a jurisdictional delineation, and prepare a Determination of Biologically Equivalent or Superior Preservation (DBESP). This portion of the project was completed within the scoped budget. A separate task order was issued to examine vernal pools present onsite after the peer review.

Page 1047 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 13

PROJECT DETAILS
Client: City of Santa Fe Springs
Location: Santa Fe Springs, CA
Reference: Wayne Morrell
Director of Planning
City of Santa Fe Springs
Planning Department
11710 Telegraph Rd,
Santa Fe Springs, CA 90670
562-868-0511, ext. 7362
waynemorrell@santafesprings.
org
Dates: Feb 2020 - Feb 2022
MIG worked with the City of Santa Fe Springs to update its General Plan and prepare the Program EIR. The 2040 General Plan is a comprehensive revision to the General Plan adopted in 1993 and 1994. MIG was hired in early 2020 to completely overhaul the General Plan, including preparation of a new Environmental Justice Element. A major component of the project was updating the Housing Element for the 6th Cycle Regional Housing Needs Allocation of 950 housing units, which represents an 18.2% increase from the existing number of housing units. The 2040 planning horizon for the Planning Area, including the City’s Sphere of Influence, is estimated to result in increases of approximately 4,572 dwellings and approximately 1,489,300 square feet of building space. An estimated increase of approximately 13,890 residents and 4,788 jobs is projected for the 2040 horizon year. Our work also included technical reports on air quality and greenhouse gas/energy, as well as a technical analysis of noise and vibration.

Santa Fe Springs General Plan and Program EIR

Page 1048 of 1311 ends

14 City of Beaumont | On-Call Planning and Environmental Services

PROJECT DETAILS
Firm: MIG
Client: County of San
Bernardino
Location: San Bernardino
County, CA
Reference: Aron Liang
Senior Planner
County of San Bernardino
290 North D Street
San Bernardino, CA 92401
909-387-0235
[email protected]
Dates: 2020 - 2021
MIG prepared an EIR for the development of the Duke Realty Warehouse Logistics Center, an approximately 1,192,671-square-foot, nonrefrigerated warehouse building on approximately 54.8 net acres of land. The building would have a maximum height of 50 feet and occupy a footprint area of 1,116,934 square feet. Onsite improvements would include approximately 293,739 square feet of landscaped area and approximately 974,669 square feet of Portland cement concrete paving for parking areas, loading areas, truck courts, and circulation drives. Implementation of the project would require several discretionary approvals by the County of San Bernardino (lead agency), including certification of the Final EIR, adoption of a Mitigation Monitoring and Reporting Program, Airport Land Use Commission approval, Site Plan Approval, approval of a Conditional Use Permit to allow the construction of the proposed warehouse building, and approval of a Tentative Parcel Map to consolidate four parcels into one large parcel.

MIG responsibilities for the project included third-party peer review of technical studies (air quality/greenhouses gases, biological resources, cultural resources, and geotechnical/soils studies) as well as preparation and processing of the EIR. Key issues for this project included historical resources (agricultural irrigation flumes), tribal cultural resources, biological resources (nesting migratory birds), air quality (VOC and NOx emissions), greenhouse gas emissions, paleontological resources, and cumulative traffic impacts (intersection Level of Service).

Through MIG’s past experience providing project entitlement services for numerous warehouse, industrial, and commercial building projects in the surrounding area, we were able to utilize our knowledge of environmental issues and neighborhood concerns associated with the East Valley area of San Bernardino County, as well as our familiarity with the San Bernardino County development review process to successfully navigate the CEQA process and deliver the Duke Realty Warehouse Logistics Center EIR on time and within budget. MIG enjoyed its collaborative working relationship with the County development staff throughout the preparation and processing of this important EIR.

Duke Realty Warehouse Project EIR

Page 1049 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 15

PROJECT DETAILS
Firm: MIG
Client: City of Grand Terrace
Location: Grand Terrace, CA
Reference: Haide Aguirre
Senior Planner
Grand Terrace Planning &
Development Services
22795 Barton Rd
Grand Terrace, CA 92313
909-954-5177
Dates: 2021-2022
MIG was contracted to complete an Initial Study and Mitigated Negative Declaration (IS/MND) for a Battery Energy Storage (BESS) Facility in the City of Grand Terrace, California. The Project site consisted of a single parcel totaling 9.86 acres. The Project will consist of lithium-ion energy batteries installed on racks, inverters, switchgear, and other associated equipment to directly interconnect into the Southern California Edison (SCE) Highgrove Substation (point of interconnection) located immediately adjacent to the north of the Project site. The Project is currently in public review as of November 2021.

Condor Battery Energy Storage Facility Project IS/MND

Page 1050 of 1311 ends

16 City of Beaumont | On-Call Planning and Environmental Services Scope of Services
MIG offers a broad scope of environmental
planning and permitting, design,
communication, management, and technology
services to public agencies and private clients.

Our public agency clients include community
development, building, planning, and public
works departments, as well as special districts.

Our array of services includes environmental
analysis in compliance with CEQA and NEPA
including:
»Environmental Impact Reports (EIRs)
»Environmental Impact Statements (EISs)
»Combined EIR/EIS
»Environmental Assessments (EAs)
»Addendums to EIRs
»Initial Study/Mitigated Negative Declarations
(IS/MNDs)
»Categorical Exemptions (CEs)
»Findings of No Significant Impact (FONSIs)
Additionally, we have in-house expertise to
prepare a full range of technical studies and
support services including:
»Biology
»AB 52 and SB 18 processing/
consultation services
»Noise
»Energy Evaluations
»Air Quality Modeling and Analysis
»Greenhouse Gas Emissions (GHG)
»Visual Simulations and Visual
Impact Analyses
»Infrastructure and “Green” Infrastructure
Analyses and Recommendations
MIG has the capabilities needed to prepare
(or review) a wide range of environmental
documents, with the exception of traffic
studies, which will be provided by Fehr & Peers.

In addition, we have relationships with a wide
array of subconsultant partners that we can call
upon if a specific service request requires their
expertise. Our team provides services in all of
the areas listed in the RFP including:
»Aesthetics and Visual Resources
»Agriculture and Forestry Resources
»Air Quality
»Biological Resources
»Energy
»Greenhouse Gas Emissions and Global
Climate Change
»Hazards and Hazardous Materials
»Hydrology and Water Quality
»Land Use and Planning
»Mineral Resources
»Noise
»Population and Housing
»Public Services
»Recreation
»Transportation
»Tribal Cultural Resources
»Utilities and Service System
»Wildfire

Page 1051 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 17 Environmental On-Call Services

CEQA/NEPA DOCUMENTS
MIG’s dedicated environmental staff have the
background and experience to properly scope
and prepare environmental impact analysis
documents for a wide variety of projects. MIG
prepares clearly written, legally defensible
environmental impact reports (EIR) and other
CEQA/NEPA compliance documentation—initial
studies (IS)/mitigated negative declarations
(MND), environmental assessments (EA)/
Findings of No Significant Impact (FONSI),
environmental impact statements (EIS), and
Categorical Exemptions/Exclusions. We
specialize in preparing both “project-specific”
environmental documents for site-specific
industrial, residential, commercial, institutional,
and mixed-use developments, as well as
broad-based “program EIRs” for specific plans,
general plans, and other policy plans.

MIG has successfully completed more than
300 EIRs, as well as numerous other CEQA
and NEPA compliance documents for public
agencies. We also provide third party peer
review services for all types of CEQA and
NEPA environmental documents and technical
studies. We regularly provide these services
to the Cities of Menifee, Commerce, Grand
Terrace, and Redlands.

AIR QUALITY IMPACT AND HEALTH

RISK ASSESSMENTS
MIG prepares the technical air quality analyses
necessary to obtain CEQA, NEPA, and other
permitting/regulatory approvals from regional,
state, and federal air agencies. MIG prepares
area and fugitive (e.g., dust and emissions from
soil disturbance and material transfer), mobile,
and stationary source emissions estimates
using agency-recommended models. The
emissions estimates developed by these
models and methodologies are compared to
regulatory thresholds of respective air quality
management districts, CEQA significance
thresholds or other state or federal regulatory
requirements as appropriate. MIG is skilled
in quantifying the emissions levels from all
aspects of a project, comparing emissions
levels and concentrations against applicable
thresholds, and developing project design
features or mitigation measures that reduce
project emissions and associated risks.

BIOLOGICAL SITE SURVEYS/SPECIAL

STATUS SPECIES SURVEYS
MIG’s experience in biological studies and
impact assessments includes the preparation
of biological surveys to evaluate existing
conditions and the presence of sensitive
habitat or special-status plant or animal species
and applicable laws pertaining to the resources
found. Biological impact assessments evaluate
the effects of a proposed project on biological
resources and are used to support CEQA/
NEPA documents and permit applications.

Page 1052 of 1311 ends

18 City of Beaumont | On-Call Planning and Environmental Services MIG also provides the technical support
required for Endangered Species Act Section
7 or Section 10 consultations and California
Fish and Wildlife Endangered Species Act 2081
permits. We have expertise in assessing the
potential occurrence of many sensitive species,
including many butterfly species and birds such
as the coastal California gnat catcher, least
bell’s vireo, and Cooper’s hawk.

REGULATORY PERMITTING
MIG’s wetland delineators maintain current
training and can identify whether specific areas
are covered under the jurisdiction of the U.S.

Army Corps of Engineers (USACE), Regional
Water Quality Control Board (RWQCB),
California Department of Fish and Wildlife
(CDFW), US Department of Fish and Wildlife
(USFWS), California Coastal Commission,
and local regulatory agencies. MIG assists
cities or projects in obtaining permits from
various regulatory agencies, including, but not
limited to, the 404 Nationwide or Individual
Permits from USACE, the Lake and Streambed
Alteration Agreement from CDFW, and the 401
Water Quality Certification from RWQCB. MIG
prepares technical studies required for these
permits as well as the permit applications.

ENERGY ESTIMATES AND EVALUATION
MIG also has expertise in evaluating the new
energy impact requirements of the recently
amended state CEQA Guidelines. Project
energy consumption is estimated using
information from air quality emissions estimates
or modeling conducted for the project. MIG
would then evaluate whether the project
would result in the wasteful, inefficient, or
unnecessary consumption of energy resources,
including mobile sources. Energy-saving
factors analyzed would include site layout
and orientation, proximity to regional arterials,
building design, and any trip-reducing or other
energy-saving operations that result in the
efficient use of available energy resources.

GREENHOUSE GAS (GHG)/CLIMATE

CHANGE IMPACT ASSESSMENTS
In California, local land use authorities are
required to consider the effects of project- and
plan-level greenhouse gas emissions as part
of the CEQA review process. Many of the
models (e.g., CalEEMod) and inventories (e.g.,
OFFROAD) MIG uses to estimate emissions of
criteria air pollutants like particulate matter also
quantify GHG emissions from common GHG
sources like vehicles, electricity consumption,
and space heating; however, the methods for
evaluating GHG emissions levels can differ
from traditional air quality analyses because
GHG emissions represent a global impact,
and there are a myriad of state, national, and
international goals, policies, and programs
adopted for the purposes of reducing GHG
emissions.

Page 1053 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 19 GHG emissions are also produced from less
common but high-emitting sources such as
refrigerants and electrical insulators that fall
outside the scope of traditional air quality
analyses.

NOISE IMPACT ASSESSMENTS
MIG performs noise monitoring and impact
assessments for environmental analysis,
mitigation monitoring, and other compliance
purposes. MIG has the necessary expertise and
equipment to monitor pre- and post-project
noise levels, documenting in-situ attenuation
patterns, and evaluating the effectiveness of
noise-reducing insulation and infrastructure.

MIG has monitored noise levels from
construction equipment, traffic, public events
(with and without amplified sound), and various
types of stationary equipment (e.g., HVAC
units, generators, concrete batch plants). MIG
collects and analyzes project-specific noise
data to assess the compatibility of pre- and
post-project noise levels with zoning standards,
general plan standards, and general quality of
life standards. MIG staff can clearly articulate
noise impact findings to decision-making
bodies and have worked with community
members, project architects, municipal staff,
and project proponents to develop mitigation
in the form of operating restrictions, sound
barriers, and sound power output limits that
provide community and project benefits.

TRAFFIC IMPACT ASSESSMENT
Fehr & Peers will prepare all necessary
transportation studies in accordance with
Senate Bill (SB 743) utilizing Vehicle Miles
Traveled (VMT) to perform transportation
impact analysis. Fehr & Peers would advise
how to approach projects consistent with
SB 743 and The Office of Planning and
Research’s (OPR’s) Technical Advisory, and the
City’s Traffic Impact Analysis Guidelines for
Vehicle Miles Traveled and Level of Service
Assessment (March 2020). Fehr & Peers
assisted the Western Riverside Council of
Governments in the development of the SB
743 implementation pathway study for member
agencies (including Beaumont) and have been
assisting local, regional, and state agencies in
implementing SB 743 and transportation impact
assessment since 2018.

Travel Demand Forecasting (TDF) models are
the recommended tool for estimating VMT.

Fehr & Peers have prepared TDF models for
many cities, counties, and regional agencies
throughout California and was part of the team
that prepared the County’s current RIVCOM
travel demand model that is consistent with
Connect SoCal 2020, the 2020 SCAG RTP.

Fehr & Peers have used models to generate
future forecast data on a variety of projects
for the Riverside County region in addition to
Caltrans facilities.

Page 1054 of 1311 ends

20 City of Beaumont | On-Call Planning and Environmental Services Fehr & Peers modeling expertise extends
to other software tools, such as simulation
software and capacity-analysis software. Fehr &
Peers will also post-process raw model outputs
to develop the appropriate level of traffic
volumes and peak-hour turning movements
at intersections and segments. Fehr & Peers
will generate data, such as volumes, average
speeds, truck traffic, and VMT by speed
class, to support air quality, GHG, and noise
impact analysis. Specific to airport freight
studies, SB 743 does not require truck VMT in
transportation impact assessment, but truck
VMT analysis is still required for air quality,
GHG, and noise impact analysis.

When Caltrans is involved, Fehr & Peers will
adhere to Caltrans requirements (including
the Traffic Analysis Framework) and provide
defensible and mutually acceptable mitigation
measures whenever necessary.

TRIBAL CULTURAL RESOURCES
MIG, in a consultative capacity, advises our
clients regarding cost-effective options to avoid
or reduce project impacts. The MIG tailored
approach also includes the documentary
procedures concerning Native American
Consultation and/or Coordination as specified
in SB 18 and AB 52 to ensure their involvement
in protecting Tribal Cultural Resources,
properties, and sensitive archaeological sites.

VISUAL IMPACT ASSESSMENTS
MIG’s graphic and computer simulation staff
specialize in computerized view simulations and
preparation of visual impact analyses. Our team
can prepare and/or review visual simulations,
urban design height analyses, shade studies,
and other illustrative plans needed for all
types of projects. Our team has extensive
experience creating illustrations and analyzing
environments allowing for the objective review
and understanding of projects.

Page 1055 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 21 MIG SELECT CEQA DOCUMENTS CEQA DOCUMENTATIONPROGRAM EIRPROJECT-SPECIFIC EIRAIR QUALITY/GHGNOISE IMPACTSBIOLOGICAL RESOURCESCULTURAL RESOURCESVISUAL IMPACT/ AESTHETICSCity of Whittier General Plan Update EIR ˜˜˜˜˜˜ City of Santa Fe Springs General Plan Update EIR ˜˜˜˜˜˜ City of Monterey Park General Plan Update EIR ˜˜˜˜
City of Walnut General Plan Update EIR ˜˜˜˜˜˜˜
City of Desert Hot Springs General Plan Update EIR ˜˜˜˜˜˜ City of Cudahy General Plan Update EIR ˜˜˜˜
City of Garden Grove General Plan Update EIR ˜˜˜˜
Smoky Hollow Specific Plan EIR, El Segundo ˜˜˜˜
Duke Realty Warehouse EIR, San Bernardino County ˜˜˜˜˜˜ Duarte Station Specific Plan EIR, Duarte ˜˜˜˜˜
Walnut Ranch Park EIR and HCP, Walnut ˜˜˜˜˜˜˜
Garvey Avenue Specific Plan EIR, Rosemead ˜˜˜˜˜
Covina Town Center Specific Plan EIR, Covina ˜˜˜˜
Poway Road Specific Plan Amendment EIR, Poway ˜˜˜˜˜
Positive Investments, Krameria Tentative Tract Map IS/MND, Moreno Valley ˜˜˜˜˜˜ Olympic R.E. Holdings, Inland Center Drive Warehouse, San Bernardino ˜˜˜˜˜˜ 7-Eleven at Perris Boulevard/Rider Street IS/MND, Perris ˜˜˜˜˜ Meredith Specific Plan EIR Addendum, Ontario ˜˜
Memorial Park Improvements IS/MND, Upland ˜˜˜˜˜
Condor Battery Energy Storage Facility IS/MND, Grand Terrace ˜˜˜˜ Cutter Way Residential IS/MND, Covina ˜˜˜˜
Sheila Street Warehouse EIR Peer Review, Commerce ˜˜˜
Costco Expansion IS/MND Addendum, Chino Hills ˜˜˜˜
Alere Telegraph Commerce Center IS/MND, Pico Rivera ˜˜˜˜ Outfront Media Digital Billboard IS/MND, Garden Grove ˜˜ South Alhambra Ave Senior Housing Project IS/MND, Monterey Park ˜˜˜˜ Blue Mountain Spruce Street Warehouse IS/MND, Riverside ˜˜ Eastern Municipal Water District Water Well 204 IS/MND, Perris ˜˜˜˜˜ S2A Modular Home Factory IS/MND, Hemet ˜˜˜˜˜
Atlantic Boulevard Improvement Categorical Exemption, Commerce ˜˜ Arbor Express Car Wash IS/MND and Technical Studies, Rancho Cucamonga ˜˜˜˜ 123 Pomona Avenue Residential IS/MND, Monrovia ˜˜˜˜
Dhammakaya Meditation Center EIR Addendum, Azusa ˜˜
Garvey Square Mixed-Use Development IS/MND, El Monte ˜˜˜ Station Square South Specific Plan IS/MND, Monrovia ˜˜˜˜˜˜˜ Avalon Monrovia Specific Plan IS/MND, Monrovia ˜˜˜˜˜˜˜
Additional Environmental
Planning Experience
MIG has a proven track record of preparing
legally sound CEQA documents, as well as
third-party peer review and biological services,
for all types of environmental projects.

Page 1056 of 1311 ends

22 City of Beaumont | On-Call Planning and Environmental Services

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

INSURER(S) AFFORDING COVERAGE
INSURER F :

INSURER E :

INSURER D :

INSURER C :

INSURER B :

INSURER A :

NAIC #
NAME:CONTACT
(A/C, No):FAX
E-MAILADDRESS:

PRODUCER
(A/C, No, Ext):PHONE

INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

OTHER:
(Per accident)
(Ea accident)
$
$
N / A

SUBRWVDADDLINSD

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOSAUTOS ONLY NON-OWNED

SCHEDULEDOWNED

ANY AUTO

AUTOMOBILE LIABILITY
Y / N

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?(Mandatory in NH)
DESCRIPTION OF OPERATIONS belowIf yes, describe under

ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT

EROTH-STATUTEPER

LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR

CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE
DAMAGE TO RENTED $PREMISES (Ea occurrence)

COMMERCIAL GENERAL LIABILITY

CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:

POLICY PRO-JECT LOC

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)

CANCELLATION

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD

HIREDAUTOS ONLY
9/26/2022
AssuredPartners Design Professionals Insurance Services,LLC3697Mt.Diablo Blvd Suite 230LafayetteCA94549 The Certificate Team
[email protected]
License#:6003745 Berkley Insurance Company 32603
MIGINC0-01 Travelers Property Casualty Company of America 25674MIG,Inc.Moore Iacofano Goltsman,Inc.800 Hearst AveBerkeleyCA94710 The Travelers Indemnity Company of Connecticut 25682
86828654
C X 1,000,000
X 1,000,000
X Contractual Liab 10,000
Included 1,000,000
2,000,000
X
Y Y 6801H899998 8/31/2022 8/31/2023
2,000,000
C 1,000,000
X
X X
Y Y BA0S579947 8/31/2022 8/31/2023
B X X 10,000,000YCUP0H7587628/31/2022Y 8/31/2023
10,000,000
X 0
B XYUB2L5539098/31/2022 8/31/2023
1,000,000
1,000,000
1,000,000
A Professional Liability N Y AEC905795904 8/31/2022 8/31/2023 Per ClaimAggregate Limit $5,000,000$5,000,000 Umbrella Liability policy is a follow-form underlying General Liability/Auto Liability/Employers Liability.FOR PROPOSALS PURPOSES .An Actual Certificate will be issued upon the request of the Named Insured. 30 Days Notice of Cancellation
***Sample***
Insurance
MIG currently has and will maintain the minimum level
of insurance as required by the City of Beaumont

Page 1057 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 23

EDUCATION
»University of
California, Riverside
»Brigham Young
University, Utah

PROFESSIONAL

AFFILIATIONS
»National Association
of Industrial and
Office Professionals
»American Planning
Association
»Urban Land Institute
Pam Steele
PRINCIPAL-IN-CHARGE | MIG
Pam Steele has extensive experience on “both sides of the counter” offering a full range of planning, environmental, and development consulting services to public agencies and private sector clients. Early in her 30-year career, she was a Building Department employee whose frequent interaction with planners shifted her path toward contributing to a project from beginning to end—from due diligence to entitlement and permit approval to occupancy. Having served as a Planning Director and as a development project manager, Pam’s strength lies in bringing people and perspectives together to create projects that provide public and private benefits. She has prepared and managed specific plans and amendments, community and master plans, and multilayered environmental reviews and clearances for industrial, commercial, residential, and medical projects. Pam distills and articulates the needs of public agencies and private developers to foster collaboration and mutual understanding. In doing so, she helps them navigate the entire process to successfully achieve their common goals.

SELECTED PROJECT EXPERIENCE
»City of Cypress Assistant Planning Director
»City of Canyon Lake Planning Director
»City of Murrieta Planning Staff
»City of Diamond Bar Consultant Staff
»City of Yucaipa Planning Staff
Some of the private-sector projects she has managed are:
»Kaiser Commerce Center: specific plan amendments and EIR for the clean-up and redevelopment of the former 540+-acre Kaiser Steel Plant in the Fontana area of San Bernardino County
»Crossroads Business Park Specific Plan amendments and build-out of a 280+ acre industrial business park in the City of Ontario »Kaiser Permanente medical facilities and master plans in the cities of Fontana, Rancho Cucamonga, Colton, San Marcos, San Bernardino, and Victorville
»Senior assisted living projects, both new and expansions of existing facilities
»Expansion of an existing steel plant to improve air quality and safety measures
»Multiple General Plan and Specific Plan Amendments
Appendix - Resumes

Page 1058 of 1311 ends

24 City of Beaumont | On-Call Planning and Environmental Services

EDUCATION
»MURP, University of
Southern California
»BA, Public Affairs (Urban
Planning), University of
Southern California
Bob Prasse

PROJECT MANAGER / DIRECTOR OF ENVIRONMENTAL
SERVICES | MIG
Bob Prasse is a fountain of knowledge and expertise in urban planning and environmental analyses. A college class on the economics of environment peaked Bob’s interest in the factors affecting the built environment, which led to a 35+-year career working with public agencies and developers throughout Southern California. With his analysis, communications, and writing skills, Bob helps clients anticipate and adjust to changing conditions while still meeting project goals related to general and specific plans, zoning ordinances, development reviews, and entitlement services. In addition, he has managed, prepared, and processed CEQA and NEPA documentation for a wide range of planning projects, including large-scale mixed-use communities, public facilities, general plans, retail centers, and warehouse/logistics complexes. Even with all his experience, Bob enjoys the continued learning associated with finding new ways to assist clients and to improve the environment.

SELECTED PROJECT EXPERIENCE
»Duke Realty Logistics Warehouse EIR,
Redlands area of San Bernardino County, CA
»City of Garden Grove Focused General Plan Update (GPU) EIR, Garden Grove, CA
»City of Whittier GPU EIR, Whittier, CA
»City of Santa Fe Springs General Plan Update EIR,
Santa Fe Springs, CA
»City of Monterey Park GPU EIR, Monterey Park, CA
»City of Desert Hot Springs General Plan Update EIR,
Desert Hot Springs, CA
»City of Cudahy GPU EIR, Cudahy, CA
»City of Hesperia General Plan Update EIR, Hesperia, CA »The Preserve Specific Plan and Program EIR, Chino, CA
»Smoky Hollow Specific Plan Program EIR, El Segundo, CA »Covina Town Center Specific Plan Program EIR, Covina, CA »Arrow Highway Specific Plan Program EIR, Glendora, CA
»Redlands Crossing Shopping Center (Walmart Store) EIR, Redlands, CA
»Renaissance Specific Plan (Rialto Airport Reuse), Program EIR, Rialto, CA

Page 1059 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 25

EDUCATION
»MS, Urban and Regional
Planning, California State
Polytechnic University,
Pomona, CA
»MA, Political Science,
Colorado State University,
Fort Collins, CO
»BA, Political Science,
San Diego State
University, San Diego, CA

PROFESSIONAL

AFFILIATIONS
»American Planning
Association
»Association of
Environmental
Professionals
»Cal Poly Pomona
Graduate Planning
Student Association
Cameron Hile
SENIOR ANALYST | MIG
Cameron Hile is an accomplished environmental planner and analyst who integrates his knowledge of public and environmental policy and planning to support responsible development and improve the interface between human and natural environments.

Cameron has successfully applied his expertise and writing skills to develop and prepare a variety of environmental documents, such as Initial Studies, Negative Declarations, Mitigated Negative Declarations, EIR Addenda, and Air Quality Analyses.

Understanding that his work can have positive impacts on communities for decades, he constantly seeks to learn and find new ways to innovate and contribute to project success. With over 10 years of experience, Cameron communicates easily with all project stakeholders and carefully plans for contingencies to ensure a smooth and straightforward planning process. Along with his knowledge and skills, he brings integrity and diligence to each project—preparing legally defensible documents through an efficient, open, and meticulous process of research, analysis, and feedback.

SELECTED PROJECT EXPERIENCE
»Rosemead Garvey Avenue Specific Plan EIR, Rosemead, CA »Whittier General Plan Update EIR, Whittier, CA
»South Alhambra Blvd. Senior Housing IS/MND,
Monterey Park, CA
»San Gabriel Valley Water Company Plant M4 IS/MND,
Montebello, CA
»Covina Town Center Specific Plan EIR, Covina, CA
»Downey Parks and Recreation Park Renovation CEQA Analyses, Downey, CA
»Cutter Way Live-Work Development IS/MND, Covina, CA
»Flair Spectrum Mixed-Use EIR, El Monte, CA
»Gelson’s Manhattan Beach Peer Review Services,
Manhattan Beach, CA
»Santa Fe Springs General Plan and Targeted Zoning Code Update, Upland, CA
»Puente Hills Habitat Preservation Authority User Survey, Whittier, CA
»Smoky Hollow Specific Plan Update EIR, El Segundo, CA
»AltaMed Corporate Headquarters Rehabilitation Project IS/MND, Commerce, CA
»Sheila Street Warehouse Project Peer Review Services,
Commerce, CA

Page 1060 of 1311 ends

26 City of Beaumont | On-Call Planning and Environmental Services

EDUCATION
»MS, Environmental
Studies, California State
University, Fullerton
»BA, Biology, California
State University, Fullerton

CERTIFICATIONS/

REGISTRATIONS
»American Institute of
Certified Planners (AICP)
»Registered Environmental
Property Assessor (REPA)

PROFESSIONAL

AFFILIATIONS
»Association of
Environmental
Professionals
»American Planning
Association
»California Association
of Environmental
Professionals, Past
President
Kent Norton, AICP, REPA
SENIOR PROJECT MANAGER | MIG
Kent Norton has 44 years of experience in California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) compliance for public- and private-sector clients encompassing transportation, aviation, public works, schools, residential, recreational, and mixed-use land developments. He has authored and managed a wide variety of environmental compliance
documents for projects ranging from an Initial Study/Mitigated Negative Declaration (IS/MND) for relocation of aviation uses at a regional airport and road widening/improvements, to a subdivision of 13,000 acres in the San Bernardino desert and the World Logistics Center Specific Plan EIR that addressed 41-plus million square feet of warehousing on 2,600 acres in the City of Moreno Valley.

SELECTED PROJECT EXPERIENCE
»Starpointe 6th Street Warehouse MND,
San Bernardino County, CA
»Memorial Park Master Plan MND, Upland, CA
»Hemet Modular Home Factory MND, Hemet, CA
»Housing Element Update ND, Downey, CA
»General Plan Update EIR, Whittier, CA
»Queen of the Valley Hospital Specific Plan EIR,
West Covina, CA
»Community Soccer Park IS/MND, Colton, CA
»General Plan EIR, Jurupa Valley, CA
»World Logistics Center Specific Plan EIR, Moreno Valley, CA »Los Alamos Hills Master Plan and EIR for Park and School Facilities, Murrieta, CA
»Marketplace at Main Street Project EIR, Corona, CA
»West Fontana Logistics Center EIR, Fontana, CA
»North Business Park Specific Plan EIR, Westlake Village, CA »Paradise Knolls Specific Plan EIR, Jurupa Valley, CA
»Limonite Avenue Widening, Bain to Homestead IS/MND,
Jurupa Valley, CA
»Space Center Industrial Project EIR, Jurupa Valley, CA »Gateway South Building 5 MND Addendum, San Bernardino, CA

Page 1061 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 27

EDUCATION
»BS, Natural Resource
Management Cook
College, Rutgers
University, New Jersey
Chris Dugan

DIRECTOR OF AIR QUALITY AND NOISE SERVICES
MIG
Christopher Dugan’s knowledge of local, state, and federal environmental regulations contributes to the successful preparation of required documentation and appropriate mitigation measures. His undergraduate studies drew him to investigate how human development affects people and the planet. His specialization in air quality, noise, and greenhouse gases ensures that development proceeds in a responsible manner to protect critical resources. Christopher skillfully takes complex information from engineers, scientists, and other data sources and clearly conveys it in a way that is meaningful and helpful for decision- makers and the public. He uses the latest technology to make the process more efficient, accurate, and comprehensive – resulting in better outputs as well as enhanced reporting and presentation.

Christopher has developed and tailored emissions inventories using CalEEMOD, EMFAC, OFFROAD, etc.; performed screening and refined dispersion modeling (e.g., SCREEN, AERMOD); and developed mitigation measures to control and reduce stationary, area, fugitive, and mobile source emissions. Given that air and noise resources are essential quality of life factors, he is committed to delivering independent, objective analysis and consultation that enable clients to make the best choices from environmental, regulatory, and community-based perspectives.

SELECTED PROJECT EXPERIENCE
»Veterans Home of California, Yountville Skilled Nursing Facility EIR/EA, Yountville, CA
»San Mateo County Government Center, Campus Development Project EIR, San Mateo County, CA
»New Yolo Branch Library Building Project EIR, Yolo County, CA »Bear Gulch Pump Station 13 Improvement Project IS/MND, Portola Valley, CA
»Cal Water MPS Station 6 Water Tank Replacement IS/MND, Hillsborough, CA
»Carlmont High School Usher Field Lights Project IS/MND, Belmont, CA
»Guadalupe Landfill Gas to Energy Facility Relocation Project EIR, San José, CA
»Habitat for Humanity Montague Housing Development Project EA, Santa Clara, CA
»Half Moon Bay Building and Garden, Inc. Concrete Batch Plant Replacement Project EIR and Permit to Operate, Half Moon Bay, CA

Page 1062 of 1311 ends

28 City of Beaumont | On-Call Planning and Environmental Services

EDUCATION
»BS, Atmospheric Science,
University of California,
Davis, CA
Phil Gleason

SENIOR ANALYST, AIR QUALITY AND NOISE SERVICES
MIG
Phil Gleason specializes in the preparation of Air Quality, Greenhouse Gas, and Noise technical environmental analyses. In his time at MIG, Phil has prepared emissions estimates and CEQA impact assessments in accordance with U.S. EPA guidance (e.g., AP-42) and regional air agency permit handbooks. In his analyses, he often uses mass emissions modeling programs and emission factor databases as well as dispersion modeling programs for comparison of pollutant concentrations to ambient air quality standards. Phil is also versed in the preparation of human health risk assessments using model data for toxic air contaminants and hazardous air pollutants. In addition to his knowledge of air quality models and assessment techniques, Phil has also utilized the SoundPLAN noise modeling software to determine the
significance of noise generated at industrial sites.

Phil has experience interpreting and enforcing various regulations including the Clean Water Act; Safe Drinking Water Act; Resource Conservation and Recovery Act; and Federal Insecticide, Fungicide, and Rodenticide Act. Phil’s past experience working for a regulatory agency has assisted him in carrying out inspections of new trial segments, which are conducted to ensure compliance with the project’s Stormwater Pollution Prevention Plan.

SELECTED PROJECT EXPERIENCE
»Smoky Hollow Specific Plan EIR, El Segundo, CA
»Crowe Vincent Ave CEQA Analysis, Azusa, CA
»Tustin Downtown Commercial Core Plan Environmental Studies, Tustin, CA
»Cudahy General Plan and Zoning Code Update EIR, Cudahy, CA »Half Moon Bay Building and Garden Supply Concrete Batch Plant EIR, Half Moon Bay, CA
»Del Amo Neighborhood Park IS/MD, Los Angeles County, CA »Meadowood Estates EIR, Hillsborough, CA
»Menlo Park Small High School EIR, Menlo Park, CA
»Palo Alto Parks and Recreation Master Plan IS/MND,
Palo Alto, CA
»Palo Alto Public Service Building EIR, Palo Alto, CA
»Rossmoor Health Club EIR, Seal Beach, CA
»San Mateo County Government Center Campus Development
Project EIR, San Mateo County, CA

Page 1063 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 29

EDUCATION
»BS, Environmental Policy
Analysis and Planning
from University of
California, Davis
Kasey Kitowski
AIR QUALITY AND NOISE ANALYST | MIG
Kasey Kitowski is a highly skilled environmental planner and analyst who has contributed their specialized expertise in air quality and noise to a wide range of projects from public infrastructure and transportation to parks and open space. An abiding interest in environmental issues led to their degree in environmental policy and continues to motivate their work in a fast-paced and ever-changing field. Kasey’s in-depth knowledge and meticulous attention to detail result in meeting client objectives for compliance while protecting community air and noise resources in the context of a changing climate. Their ability to analyze and synthesize data from multiple sources produces clear, well-articulated air quality, climate change, and noise analyses. Kasey is inspired by opportunities to work on projects that have tangible, measurable impacts—developing feasible resource protection strategies that provide environmental benefits and facilitate effective project implementation.

SELECTED PROJECT EXPERIENCE
»Costco Expansion IS/MND, City of Chino Hills, CA
»West Hollywood Climate Action Plan Update and CEQA
Review, West Hollywood, CA
»Standard Works Project, El Segundo, CA
»San Carlos 405 Industrial Road CEQA, San Carlos, CA
»San Carlos General Plan Update and Zoning Amendment,
San Carlos, CA
»Lake Elsinore General Plan Update EIR, Lake Elsinore, CA »Watsonville - Ohlone Parkway East/West, Watsonville, CA »Santa Fe Springs General Plan and Targeted Zoning Code, Santa Fe Springs, CA
»Oxnard Campus Park Design, Oxnard, CA
»San Pablo Avenue Specific Plan Update, El Cerrito, CA
»Freedom Circle Focus Area Plan, Santa Clara, CA
»Rustin Warehouse, Riverside, CA
»Marin County Housing and Safety Elements, Marin County, CA »Clayton Housing Element, Clayton, CA

Page 1064 of 1311 ends

30 City of Beaumont | On-Call Planning and Environmental Services

EDUCATION
»MS, Environmental
Management, Griffith
University, Australia
»BA, Environmental
Studies, Economics,
University of California,
Santa Cruz, CA
»AA, Ventura College,
Ventura, CA

REGISTRATIONS
»Wetland Delineation
Certification (Richard
Chinn Environmental
Training, Inc.; Certificate
No. 6425)
»Flat-tailed Horned Lizard
(FTHL) Authorization
(Title 14)
Todd Easley
DIRECTOR OF BIOLOGY | MIG
Todd Easley has over 23 years of experience in the
environmental industry focusing on biological resources, regulatory permitting, and project management. He has
seasoned experience related to the federal Endangered Species Act (ESA), Native Plant Protection Act, Federal Noxious Weed Act, NEPA, CEQA, Migratory Bird Treaty Act, Clean Water Act, and other acts and laws related to the environmental industry.

He has successfully coordinated and managed multidisciplinary projects and has collaborated with different landowners, organizations, and agencies such as wildlife agencies, utilities, the Department of Defense, parks, public works agencies, city and county agencies, nonprofits, and private businesses.

Additionally, he is proficient leader in establishing efficient project teams, discussions on scopes of work and alternatives, biological surveys, permitting, habitat restoration, and the avoidance or minimization of impacts to the environment.

SELECTED PROJECT EXPERIENCE
»Natural Resource Services and Habitat Enhancement for the Department of Defense, Orange County, CA*
»Rare Plant Inventory Surveys, Marine Corps Base Camp
Pendleton, CA*
»Marblehead Coastal Bluff Biological Surveys and Habitat Restoration, San Clemente, CA*
»Implement Habitat Enhancement Portions of Thread-Leaved Brodiaea and Rare Plant Management Plans, Marine Corps
Installations West Camp Pendleton, CA*
»Talega Substation biological survey and Habitat restoration, San Clemente, CA*
»Joint Strike Fighter F-35 Vernal Pool creation and Mitigation, Miramar, San Diego, CA*
»Pre- and Post-Fire Management, Marine Corps Base Camp
Pendleton Camp Pendleton, CA*
»Invasive Plant Control and Revegetation Remote Training Site Warner Springs, San Diego, CA*
»West of Devers Transmission Upgrade Biological Services, Riverside and San Bernardino Counties, CA*
»Highlands Coastal California Gnatcatcher and Southwestern Willow Flycatcher Protocol Surveys, San Marcos, CA*
*Work completed prior to joining MIG

Page 1065 of 1311 ends

City of Beaumont | On-Call Planning and Environmental Services 31

EDUCATION
»PhD, Botany, Claremont
Graduate University,
Clarement, CA
»Certification, Geographic
Information Systems
(GIS), California State
University,
San Bernardino
»BS, Biology, California
State University,
San Bernardino

REGISTRATIONS
»Wetland Delineation
Certification (Richard
Chinn Environmental
Training, Inc.; Certificate
No. 6425)
»Flat-tailed Horned Lizard
(FTHL) Authorization
(Title 14)
Betty Kempton, PHD
SENIOR BIOLOGIST | MIG
A highly versatile biologist and botanist, Betty Kempton offers a depth of experience and expertise acquired over 17 years of work on a variety of environmental planning and consulting projects. An undergraduate botany class sparked her interest in plants and led to a lifelong passion. Betty views each project as an opportunity to discover something beautiful while planning for the benefit of both people and the planet. From biological assessments and surveys to monitoring and jurisdictional delineations, her extensive knowledge, GIS mapping skills, and fluid communication style allow her to convey complex information to project sponsors, partners, and stakeholders efficiently and accurately. Betty has worked with local, state, and federal agencies on a variety of projects, including public utilities, transportation, water districts, and residential and commercial developments. Through her work, she helps balance environmental protection with project implementation, allowing projects to move forward without significantly impacting biological and other important natural and cultural resources.

SELECTED PROJECT EXPERIENCE
»North Hills Jurisdictional Delineation, Brea, CA
»Valley State Route 60/Moreno Beach Drive Interchange Project Phase 2 (Burrowing Owl Assessment, Natural Environmental Study, MSHCP CA and DBESP, Jurisdictional Delineation, and Water Permitting), Moreno Valley, CA*
»Metropolitan Water District Mecca Road Emergency Repairs Project, Biological Monitoring, Mecca, Riverside County and Coachella Valley, CA*
»SCE West of Devers Upgrade (WODUP) Project, Rare Plant Surveys, San Bernardino and Riverside Counties, CA*
»Redlands Wastewater Treatment Plant Improvement Project, Biological Assessment, Redlands, CA*
»Los Angeles Department of Water Metropolitan Water District San Gabriel Tower Improvements Project, Rare Plant Surveys, Vegetation Mapping, Azusa, CA*
»LADWP Barren Ridge Line-1 Reconnaissance-Level Plant
Surveys, Rare Plant Surveys, Los Angeles County, CA*
»LADWP Bee Canyon Sag Pipe Improvement Project, Rare Plant Surveys, Vegetation Mapping, Los Angeles County, CA*
»Star Pointe Properties 6th St Commerce Center, Biological Surveys, San Bernardino, CA
*Work completed prior to joinng MIG

Page 1066 of 1311 ends

32 City of Beaumont | On-Call Planning and Environmental Services

EDUCATION
»BS, Civil Engineering,
University of California,
Davis

REGISTRATIONS
»Licensed Traffic Engineer,
State of California
(TR2402)

RECOGNITION
»WTS Honorable Ray
LaHood Award Winner
(Man of the Year) – Inland
Empire Chapter (2023)

PRESENTATIONS
»VMT Related Presentations:
-2023 UCLA Land
Use Law and Policy
Conference
-2022 National APA
-2022 Western ITE
-2022 CEAC Public
Works Officers Institute
-2022 SBCOG City/
County Conference
-2019 California APA
-2019 CSU Facilities
Conference
»Future of Transportation
Presentations:
-2018 SBCTA City/
County Conference
-2017 WRCOG Planning
Conference
»Parking Presentations:
-2018 OC Planning
Directors Conference
-2015 OC Planning
Directors Conference
Jason Pack, TE
PRINCIPAL TRAFFIC ENGINEER | FEHR & PEERS
Jason D. Pack, P.E., is a Principal with Fehr & Peers located in Southern California. He is actively involved in a wide variety of project work but also finds time to lead the firm’s research and development efforts in Emergency Evacuation assessment.

Jason has an extensive background in travel demand
forecasting, traffic operations assessment (including micro- simulation assessment), VMT analysis, big data analysis, transit ridership forecasting, and transportation impact studies involving NEPA and CEQA. His focus is to utilize his experience and the technical resources of the company to help clients answer their toughest questions related to mobility.

His recent work has included forecasting and operations assessment for large infrastructure improvements, developing recommendations for SB 743 implementation (California’s new requirements to consider VMT as an impact metric under CEQA), assisting agencies with establishing VMT banks/exchanges, emergency evacuation assessment to respond to new legislative requirements (SB 99 and AB 747), and development of innovative transportation policies to assist cities advancing transportation into the future.

SELECTED PROJECT EXPERIENCE
»WRCOG VMT SB 743 Implementation Study, CA
»SBCTA SB 743 Countywide VMT SB 743 Implementation
Phase I, CA
»SBCTA SB 743 Countywide VMT SB 743 Implementation
Phase II (VMT mitigation bank/exchange program), CA
»North Orange County Collaborative VMT SB 743
Implementation Study/Guidelines, CA
»CSU SB 743 Guidelines, CA
»County of San Bernardino Transportation Impact Study
Guidelines, CA
»Corona SB 743 Implementation, CA
»Eastvale SB 743 Implementation, CA
»Moreno Valley SB 743 Implementation, CA
»Villages at Lakeview Traffic Impact Study, Riverside County, CA »Riverside Housing Element Traffic Impact Study, CA
»Beach Boulevard Corridor Specific Plan, Anaheim, CA
»MAG High Capacity Transit Corridors Sustainability Study, Phoenix, AZ
»RTC of Southern Nevada High Capacity Transit Study, NV

Page 1067 of 1311 ends
← All documents from this meeting