Staff Report

TO: City Council
FROM: Robert Vestal, Interim Public Works Director
DATE September 5, 2023
SUBJECT: Award a Public Works Agreement to Vance Corporation for Construction of Citywide Street Rehabilitation and Maintenance Project in an Amount Not to Exceed $4,857,405 – Capital Improvement Project R-24

Description Citywide Street Rehabilitation and Maintenance Project (CIP R-24).

Background and Analysis:

On January 17, 2023, City Council approved the street selection for the 2023 Citywide Street Rehabilitation and Maintenance Project (Project) and authorized the Public Works Director to finalize the bid package and solicit bids.

Consistent with Council’s direction, staff prepared plans and specification and advertised the Project on July 27, 2023. On August 22, 2023, five (5) bids were received and publicly opened. The following is a summary of the received bids:

1. Vance Corporation $4,831,824

2. Matich Corporation $5,198,418

3. Calmex Engineering $5,943,692

4. All American Asphalt $6,127,783

5. Hardy and Harper $6,275,000

Vance Corporation is the apparent lowest responsive and responsible bidder. No bid challenges were received. Only the base bid was considered in evaluating the bids for the apparent lowest bidder. Vance Corporation had a minor irregularity in the base bid schedule, item 6 total cost. The stated total of $216,521 was incorrect and should read $220,621. The minor irregularity did not provide an advantage compared to the other bidders.

In addition to the base bid, the Project bid package included an additive bid schedule A (Additive A). Additive A allows for the mill and overlay of the alley, east of Beaumont Avenue, between Sixth Street and Seventh Street, and the connected east -west alley

Page 348 of 669 ends

portion. Vance Corporation provided an Additive A total cost of $25,581. City staff is recommending including Additive A as part of the Project construction.

City staff anticipates scheduling a preconstruction meeting with Vance Corporation within ten days of contract execution and issuing a Notice to Proceed (NTP).

Subsequently, Vance Corporation will have ten days to commence construction after the NTP is issued.

Fiscal Impact:

The cost to prepare this staff report is estimated to be $750. Construction cost for the Project will be paid from the Citywide Street Rehabilitation and Maintenance Project (CIP R-24). The following table is a summary of the Project budget:

R-24 Citywide Street Rehabilitation and Maintenance 23/24 Project Accounting Summary
Funding Summary
Funding Year Funding Source Amount
22/23 SB1 $1,117,898
22/23 Measure A $1,638,936
22/23 CDBG $503,086
22/23 General $3,101,170
Total Project Funding = $6,361,090
Budget Summary
Project Component Budget Encumbered Paid to
Date
Remaining
Budget
Project Management $0 $0 $0 $0
Preliminary Services $0 $0 $0 $0
Environmental $0 $0 $0 $0
Design $0 $0 $0 $0
Construction $6,361,090 ($74,877) $0 $6,286,213
Construction Management $0 $0 $0 $0
Permits $0 $0 $0 $0
Equipment $0 $0 $0 $0
Project Summary Totals $6,361,090 ($74,877) $0 $6,286,213

The public works agreement with Vance Corporation for construction will be in an amount not to exceed $4,857,405. Staff is recommending a construction contingency of $971,481, or approximately 20% of the public works agreement, to allow for unforeseen construction changes. The total construction amount requested at this time is therefore $5,828,886. The construction budget will be established from the available CIP budget as shown in the preceding table.

Page 349 of 669 ends

Recommended Action:

Waive all minor bid irregularities and award a Public Works Agreement to Vance Corporation for construction of Citywide Street Rehabilitation and Maintenance Project (CIP R-24) in an amount not to exceed $4,857,405; and authorize the City Manager to sign change orders up to an additional $971,481 for a total construction amount of $5,828,886.

Attachments:

A. Public Works Agreement (Vance Corporation)
B. Project Plans and Specifications

Page 350 of 669 ends

!>
!>
!(
!(
!(
!(
[[[[[[[[[[
[[[[[[[[[[
!(
!(!(
!(
!(
!(!(!(!(!(!(
!(
!(
!(
!(!(
!(
CITY OF BEAUMONT2023 Annual Street Projects - TowncenterPUBLIC WORKS DEPARTMENT Date Created: 7/24/2023
I
Legend
!(Sewer Manhole
!(Stormdrain Manhole
[Traffic Loop
!(Gas Valve
!>Edison Vault
2023 Street Project
Mill
Mill- Additive
Slurry

Page 351 of 669 ends

!(!(!(!(
!(!(
!(
!(!(!(
!(!(
!(

OAK VALLEY PKWY

TWELFTH ST

MEDIAN BREAK
13TH ST

MEDIAN BREAK

MEDIAN BREAK

MEDIAN BREAK

MEDIAN BREAK

BEAUMONT AVE
PA
L
M
AV
E
PA
L
M
AV
E
PA
L
M
AV
E
PA
L
M
AV
E

MICHIGAN AVE

TWELFTH ST

SHERIE CT

TWELFTH ST

ORANGE AVE
PE
NN

SYLVANIA AVE

KYLIE CT

CYRISE LN

ELIZABETH AVE

FA I T H C I R

CHESTNUT AVE

DADASH ST

OAK VALLEY PKWY

CAMERON ST

MAGNOLIA
AVE

MOIRA ST
EUC
LI
D AVE

ANTONELL CT
13TH ST

TWELFTH ST
MAP
LE
AVE

DONNA DR

CHRISTINA ST

SHELBY ST

MASSACH

USETTS AVE

LARAINE DR
MA
P
L
E
AV
E

SAN MIGUEL DR
CITY OF BEAUMONT2023 Annual Street Projects - TowncenterPUBLIC WORKS DEPARTMENT Date Created: 7/24/2023
I
Legend
!(Sewer Manhole
!(Stormdrain Manhole
[Traffic Loop
!(Gas Valve
!>Edison Vault
Dig Outs
2023 Street Project
Mill
Slurry

Page 352 of 669 ends

SUNDANCE DR

S T A R L I G H T A V E

BURGANDYROSE
WAY

CHINABERRY LN

BEGONIAWAY

AMBROSIA
ST

SUNSET PL
S
N
A
P
D
R
A
G
O
N

WAY

POINSETTIA WAY

S U M A C C T

DAFFODIL WAY

OAK VALLEY PKWY
YARROW
LN

ALPINE CT

CURRANT WAY

Q U E E N A N N E S L N

D I A N T H U S W A Y

AGAVECT

S O R R E L C T

EM ERALD MOON WAY
IVY LN

WATE R LEA F C T

JONQUIL LN

SUNFLOWERCT

CHENILLE WAY

SILVERTORCH W A Y
D
O
R
A
D
O W
A
Y

C A R I N A W A Y

DAYBREAK WAY

S U N B U R S T DR

NEW DAWN LNSHOOTING
S
T
A
R
D
R

RAI N LILY WAY
A
P
O
L
L
O WAY

MIDNIGHT SUN DR

VERONICA CT

JADE MOON LN

SUNBURSTDR

RIGEL ST

MOONLIGHTDR

ACANTHUS LN

DEL SOL WAY

HUNTERMOON
WAY
MARI

POSA PL

NIGH THAWK PL

DAISY DR

BLU E STA R WAY
P
OP
P
Y
CT

W I LL OW M OON WAY SAGEBRUSH
PL

BEACH GRASS WAY
H
A
D
A
R
WAY

GOLD FINCH PL
FR
E
EZ
IA WAY

SAND PIPER DR

CORAL PL

SAGEBRUSH WAY

SENITADR

MOSS ROSE WAY
S
E
R
A
M
OON
DR

SEAGULL DR

BLAZING STAR DR

DESERT STAR DR

DOVE LN

EARLY BLUE LN

PAVO D R

LYRA W A Y

SILVERTORCHDR

S P I C A D R

XENIA AVE

BOTTLEBRUSH CT

BAYBERRY LN

JUNIPER LN

CARNATION
L
N

DAY LILY DR

HALF MOON LN

POLARIS LN

S H O O T I N G S T A R D R

WHITE CLOUD LNLARKSPURLN

SMOKETREELN

BIG SKY DR

CRESCENT MOONWAY

SUNDANCE
DR

C LO V E R WAY

ASTER PL

SPARROW PT

SILVERBERRY
LN

STARRY SKIES RD

FALLBROOK RD

HEATH LN
AM
BER
LILY
DR

TIGERFLOWER
DR
P
H
O
E
N
I
X
D
R

S U N D A N C E CIR

SUNDANCEC I R
CITY OF BEAUMONT2023 Annual Street Projects - SundancePUBLIC WORKS DEPARTMENT Date Created: 7/24/2023
I
Legend
!(Sewer Manhole
!(Stormdrain Manhole
[Traffic Loop
!(Gas Valve
!>Edison Vault
2023 Street Project
Mill
Slurry

Page 353 of 669 ends

!>
!>
!>
[[[[[[[[[[!(!(
!(
!(!(
!(
!(
!(!(
!(!(
!(!(!(!(
AMER
ICA
N AVE
6TH ST
PENNS

YLVANIA AVE
I
LL

INOIS AVE
6TH ST
6TH ST
CITY OF BEAUMONT2023 Annual Street Projects - 6th StreetPUBLIC WORKS DEPARTMENT Date Created: 7/24/2023
I
Legend
!(Sewer Manhole
!(Stormdrain Manhole
[Traffic Loop
!(Gas Valve
!>Edison Vault
2023 Street Project
Mill
Slurry
!>!>!>
!>
[[[[[[[[[[[[
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
X
E
N
I
A AV
E

HIGHLAND SPRINGS AVE
6TH ST
6TH ST
H
I
G
H
L
A
N
D

S
P
R
I
NG
S
AV
E

ALLEGHENY AVE

Page 354 of 669 ends

S I GNAL P E A K
SENECA

SPRINGS
PKWY

P O T R E R O B L V D POTRERO BLVD

FOURSEASONSCIR

TINKERS CREEK PARK

FOSTER ST
W
HI
T
E
S
A
N
D
S

PENNSYLVANIA AVE

LANAI ST

LYNN AVE
L
O
T
U
S

A
V
E
PA
L
M
AVE

G O R D O N C T

BENCHMARK ST

FESTIVECT

GLORIAAVE

FAIRCLIFF ST

KINN AVE
MALAGA
A
V
E

DUNSTON S TR
O
Y
A
L

C
T

TOURSCT

TAHOEST

DIEGO RD

ARCHES PARK

LENORECT

BOSTONAVE
T
EM
P
L
E
AVE

ESTANCIA S T
DRAKE
AVE

KOBE ST

TARGA LN
GAETA
CT

NE W TO N S T

P OTRERO B L V D

L E A F ST
B
E
R
K
S
H
I
R
E
AV
E
L
O
G
A
N
AVE

LOMA AVE

S E N E C A S P R I N G S P K W Y
SENECA

SPRINGS
PKWY

FLEETST

AZTEC CT

GABLE CT
M
I
C
H
I
G
A
N
A
V
E

BECK CT

BOGEY DR

PAISLEYCT

TRIPOLIST

UNDERHILL CT

BROADRIVER TRL
GOTHIC
AVE
MA
N
Z
A
NI
TA PAR
K
R
D

JACKSON CT

DWYERAVE
FINLEY
A
V
E

O L Y M P I C S T

BROWNIE WAY
SENECA

SPRINGS
PKWY
CITY OF BEAUMONT2023 Annual Street Projects - Seneca Springs SouthPUBLIC WORKS DEPARTMENT Date Created: 7/24/2023
I
Legend
!(Sewer Manhole
!(Stormdrain Manhole
[Traffic Loop
!(Gas Valve
!>Edison Vault
2023 Street Project
Mill
Slurry

Page 355 of 669 ends

M
A
R
R D
R

B E A N S T
D
E
V
LIN
DR

B E A N

M I L L ER P L
S
I
N
G
H

S
T

MORRIS ST

VENTURI AVE

DEMARETDR

JONES WAY

FLOYD CIR

ARMOUR A V E

STANDLERST
M
A
R

R I RW I N S T
SA
N TIM
OTE
O C
A
NY
O
N R
D

B E A N S T
O
G
R
A
D
Y
CT

PEPPER LN

GEIBERGERCT

WOODSPL

H A G E N HEIGHTS

BOROS BLVD

P A L M E R A V EVARDONST

KITE ST MIDDLECOFF CT

L I T T L E R L N
C
RENSH
A
W ST

BURKE ST
CITY OF BEAUMONT2023 Annual Street Projects - Fairway CanyonPUBLIC WORKS DEPARTMENT Date Created: 7/24/2023
I
Legend
!(Sewer Manhole
!(Stormdrain Manhole
[Traffic Loop
!(Gas Valve
!>Edison Vault
2023 Street Project
Mill
Slurry

BYRON TRL ROSBURGRD

PALMER AVE

LOCKE LN

TREVINOTRL

S A N D E R S S T

HARMON HEIGHTSJONES WAY
J
A
C
K
L
I
N

TERRACE
DR

MILLER PL N I C KL A US N O O K

HOGAN A V E
H
A
R
M
O
N
H
E
I
G
H
T
S
TRL

H O G A N D DR RUNYAN RD
C
H
E
R
R
Y
V
A
L
L
E
Y
BLV
D
C
A
S
P
E
R
CV

STOCKTON ST

COODY AVE

MIDDLECOFFCT

STANDLERST

PICARDPL

SNEAD ST
A
N
D
E
R
S
O
N
S
T

HOGAN DR

Page 356 of 669 ends

DA
X AVE
Z
I
L
L
I
O
N

S
T

CASEY CT

S T R A I G H T A W A Y D R
A
M
A
T
U
E
R
WAY

CONNOR CT
I 10HOSEL S T
P
E
R
K
I
N
S

C
I
R

A M A T E U R WAY

A L B A T R O S S S T

PARKWAY DR

HIGH RIDGE DR

BR U T US WAY

DEUCE CT

RANCHO VISTA DR

BRU T US WAY

KELLY ST
CUR
T
IS WAY

GALLERY LN DIVOT DR

DESERT LA
W
N DR
NI
LS
E
N
C
T

OAK VALLEY PKWY
A
M
A
T
U
E
R
W
A
Y

BLADE ST

W E D G E S D R
BOWKER
P
L
AY
C
T

GATEWAY DR

DESERT LAWN DR

SAN TIMOTEO CANYON RD
BLADE
S
T

POTRERO BLVD
CITY OF BEAUMONT2023 Annual Street Projects - CurtisPUBLIC WORKS DEPARTMENT Date Created: 7/24/2023
I
Legend
!(Sewer Manhole
!(Stormdrain Manhole
[Traffic Loop
!(Gas Valve
!>Edison Vault
2023 Street Project
ARAM
Mill
Slurry

Page 357 of 669 ends

CITY OF BEAUMONT2023 Annual Street Projects - Street and Curb Ramp ListPUBLIC WORKS DEPARTMENT Date Created: 7/24/2023
I
Str e e t Nam e Fr om To Tr e atm e nt Ar e a (SF)Location 0 Perkins Cul-de-sac Ranc ho V is ta A RA M 15024.691421 CurtisRancho V is ta Perkins Nils en A RA M 27336.30731 CurtisNilsenRancho V ista Cul-de-s ac A RA M 15351.459409 CurtisEndresenRancho V ista Cul-de-s ac A RA M 8248.379243 CurtisGatewayOak V alley Brutus A RA M 19039.804754 CurtisKellyRancho V ista Brutus A RA M 11834.15181 CurtisConnorParkwayCul-de-s ac A RA M 12056.152613 CurtisParkwayCul-de-sac Connor A RA M 31021.602836 CurtisDaxParkwayBrutusARAM7990.254837 CurtisBrutusDaxKellyARAM60966.956294 CurtisKellyBrutusHigh Ridge A RA M 6676.064243 CurtisCurtisBrutusHigh Ridge A RA M 6753.755738 CurtisHigh Ridge Curtis Kelly A RA M 61937.154624 CurtisCaseyParkwaycul-de-s ac A RA M 7626.398501 CurtisBrutusCul-de-sac Dax A RA M 10865.571376 CurtisBrutusKellyDesert Law n A RA M 15384.262114 CurtisHigh Ridge Cul-de-sac Curtis A RA M 12086.796588 CurtisHigh Ridge Kelly Cul-de-s ac A RA M 10999.142255 CurtisCrenshawCul-de-sac Tract Boundary Slurry 42800.855201 Fairw ay CanyonPepperCrenshawDevlinSlurry27540.596362 Fairw ay CanyonDevlinPepperTract Boundary Slurry 22807.817806 Fairw ay CanyonO Grady Cul-de-sac Pepper Slurry 15532.375413 Fairw ay CanyonO Grady Pepper Cul-de-s ac Slurry 14581.600105 Fairw ay CanyonDemaretMillerPalmerSlurry14704.457187 Fairw ay CanyonKiteCul-de-sac Demaret Slurry 18648.949582 Fairw ay CanyonMillerCul-de-sac Cul-de-s ac Slurry 51534.382384 Fairw ay CanyonJonesPalmerMillerSlurry15723.434534 Fairw ay CanyonMiddlecoffCul-de-sac Jones Slurry 21745.292669 Fairw ay CanyonMiddlecoffJonesCul-de-s ac Slurry 21605.140703 Fairw ay CanyonNicklausCul-de-sac Harmon Heights Slurry 15885.550341 Fairw ay CanyonHarmon Heights Nic klaus Palmer Slurry 16945.515935 Fairw ay CanyonHoganHarmon Heights Trevino Slurry 65263.57666 Fairw ay CanyonJacklin Terrac e Hogan Cul-de-s ac Slurry 11990.96938 Fairw ay CanyonSneadTrevinoRunyanSlurry29052.838799 Fairw ay CanyonRunyanSneadTrevinoSlurry14569.67005 Fairw ay CanyonCoodyCul-de-sac Trevino Slurry 21830.015034 Fairw ay CanyonTrevinoTract Boundary Cul-de-s ac Slurry 41455.177953 Fairw ay CanyonRosburgTrevinoAndersonSlurry21561.293599 Fairw ay CanyonAndersonRosburgSandersSlurry36075.51788 Fairw ay CanyonCasperCul-de-sac Trevino Slurry 20220.127581 Fairw ay CanyonSandersTrevinoCherry V alley Slurry 11912.202473 Fairw ay CanyonBurkeDevinFloydNone23980.388514 Fairw ay CanyonLittlerCul-de-sac V enturi None 20859.70597 Fairw ay CanyonVenturiCul-de-sac Boros None 86940.919591 Fairw ay CanyonMorrisVenturiPalmerNone41321.556749 Fairw ay CanyonBorosCul-de-sac A rmour None 36328.374768 Fairw ay CanyonArmourCul-de-sac Palmer None 48702.940386 Fairw ay CanyonBorosArmourCul-de-s ac None 24475.596138 Fairw ay CanyonWoodsArmourCul-de-s ac None 15538.857336 Fairw ay CanyonIrwinCul-de-sac Palmer None 37112.407227 Fairw ay CanyonFloydCul-de-sac Irw in None 10134.162616 Fairw ay CanyonOak V alley Potrero Des ert Law n Slurry 252854.249349 OV PDiegoCul-de-sac Potrero Slurry 19197.421604 Senec a SpringsKinnCul-de-sac Diego Slurry 22261.119857 Senec a SpringsTargaDiegoKobeSlurry24859.188216 Senec a SpringsKobeTargaBrownieSlurry21578.904351 Senec a SpringsBrownieKobeManzanitaSlurry42527.8961 Senec a SpringsBogeyKobeCul-de-s ac Slurry 16575.491241 Senec a SpringsSeneca Springs Manzanita Potrero Slurry 139786.465431 Senec a SpringsLynnSeneca Springs Es tanc ia Slurry 4276.98206 Senec a SpringsEstanciaLoganMalagaSlurry38992.02372 Senec a SpringsLoganOlympicEstanciaSlurry11087.409738 Senec a SpringsOlympicLoganMalagaSlurry40763.35134 Senec a SpringsMalagaSeneca Springs Oly mpic Slurry 17968.135526 Senec a SpringsLanaiSeneca Springs Dw yer Slurry 4880.371457 Senec a SpringsDwyerDustonFaircliffSlurry35817.40049 Senec a SpringsDustonDwyerFinleySlurry22928.125144 Senec a SpringsDrakeCul-de-sac Dus ton Slurry 25976.686047 Senec a SpringsGableCul-de-sac Fairc lif f Slurry 17144.452996 Senec a SpringsFaircliffGableFinleySlurry35609.848145 Senec a SpringsFinleyFaircliffDustonSlurry30832.964052 Senec a SpringsDrakeDunstonTahoeSlurry9566.439895 Senec a SpringsTahoeSeneca Springs Temple Slurry 29980.106414 Senec a SpringsTempleTahoeToursSlurry38082.808818 Senec a SpringsTripoliSeneca Springs Temple Slurry 15935.1341 Senec a SpringsUnderhillCul-de-sac Temple Slurry 22056.655795 Senec a SpringsPaisleyCul-de-sac Benc hmark Slurry 18277.234798 Senec a SpringsAztecCul-de-sac Bos ton Slurry 15613.137832 Senec a SpringsFleetFestiveBostonSlurry25267.427327 Senec a SpringsBostonBenchmarkCul-de-s ac Slurry 36172.498172 Senec a SpringsBenchmarkSeneca Springs Gothic Slurry 17577.281888 Senec a SpringsGothicBenchmarkNewtonSlurry24442.203018 Senec a SpringsNewtonLotusGothicSlurry22157.211449 Senec a SpringsRoyalCul-de-sac New ton Slurry 10142.161456 Senec a SpringsLotusSeneca Springs Leaf Slurry 22613.288829 Senec a SpringsLomaCul-de-sac Leaf Slurry 17389.752522 Senec a SpringsLeafLomaLenoreSlurry25425.163314 Senec a SpringsLenoreLeafCul-de-s ac Slurry 39765.443723 Senec a SpringsJacksonCul-de-sac Lenore Slurry 30016.140184 Senec a SpringsBeckCul-de-sac Gloria Slurry 16383.883154 Senec a SpringsGloriaFosterPotreroSlurry17252.510493 Senec a SpringsFosterLenoreGaetaSlurry30263.356643 Senec a SpringsGaetaCul-de-sac Fos ter Slurry 13466.88608 Senec a SpringsSixth Street Penns y lv ania Highland Springs Mill 538098.865388 Six thSunsetStarlightNew Daw n Slurry 3750.84771 SundanceNew Daw n Cul-de-sac Midnight Sun Slurry 24191.278676 SundanceMidnight Sun New Daw n Silv er Torc h Slurry 27624.969908 SundanceMoonlightNew Daw n Silv er Torc h Slurry 26022.397865 SundanceCrescent Moon Moonlight Cul-de-s ac Slurry 14474.779069 SundanceSilver Torch Oak V alley Big Sky Slurry 20370.864278 SundanceBig Sky Cul-de-sac Fall Brook Slurry 58361.090367 SundanceFallbrookBig Sky Midnight Sun Slurry 17523.994288 SundanceMidnight Sun Silver Torc h Fallbrock Slurry 41415.819599 SundanceWhite Cloud Midnight Sun Cul-de-s ac Slurry 13416.206932 SundanceStarry Skies Midnight Sun Big Sky Slurry 13566.407677 SundanceHalf Moon Midnight Sun Cul-de-s ac Slurry 12791.870523 SundanceDaybreakMidnight Sun Cul-de-s ac Slurry 9950.408019 SundanceDaybreakOak V alley Midnight Sun Slurry 3958.690311 SundanceSagebrushSundanceSagebrushSlurry6617.329915 SundanceSilver Torch Sagebrus h Oak V alley Slurry 41167.478417 SundanceSunflowerCul-de-sac Silv ertor ch Slurry 16327.590134 Sundance Early Blue A s ter Sentia Slurry 22060.411458 SundanceDay Lilly Sunf low er A ster Slurry 9787.23717 SundanceAsterEarly Blue Day Lily Slurry 14569.523554 SundanceSenitaEarly Blue Wall Flow er Slurry 7944.62032 SundanceWall Flow er Poppy Cul-de-s ac Slurry 16119.271934 SundancePoppySilver Torc h Cul-de-s ac Slurry 25569.734237 Sundance Str e e t Nam e Fr om To Tr e atm e nt Ar e a (SF)LocationSagebrushCul-de-sac Cul-de-sac Slurry 48506.046731 SundanceShooting Star Cul-de-sac Rain Lily Slurry 79597.268952 SundanceRain Lily Shooting Star Blaz ing Star Slurry 18797.617769 SundanceDoradoStarlightShooting Star Slurry 3709.957922 SundanceCarinaStarlightShooting Star Slurry 3724.922839 SundanceDesert Star Shooting Star Willow Moon Slurry 27885.805182 SundanceWillow Moon Desert Star Ly ra Slurry 17097.983299 SundanceLyraDesert Star Waterleaf Slurry 35646.497249 SundanceWaterleafLyraCul-de-sac Slurry 22587.613538 SundanceBottlebrushCul-de-sac Willow moon Slurry 12064.406904 SundanceSeagullWaterleafRain Lily Slurry 6644.025263 SundanceBlazing Star Rain liliy Sunburst Slurry 6815.121499 SundanceLarkspurMariposaDaisySlurry50877.101639 SundanceDaisyLarkspurAmber Lily Slurry 13599.351663 SundanceAmber Lily Cul-de-sac Dais y Slurry 24933.837594 SundanceIvySundanceLarkspurSlurry3689.982096 SundanceJade Moon Emerald Moon Sand Piper Slurry 6605.427148 SundanceSand Piper Jade Moon Mos s Ros e Slurry 24529.220496 SundanceMoss Ross Blue Star Sand Piper Slurry 7421.5284 SundanceBlue Star Mos s Rose Sera Moon Slurry 17569.03389 SundanceGold Finc h Jade Moon Sera Moon Slurry 7866.773504 SundanceSera Moon Gold Finc h Sand Piper Slurry 21116.424871 SundanceSparrowCul-de-sac Blue Star Slurry 18847.825114 SundanceEmerald Moon Starlight Rigel Slurry 2899.169922 SundanceRogelSpicaPavoSlurry27586.964247 SundancePavoRigelApolloSlurry9331.858321 SundanceSpicaApolloRigelSlurry8539.488782 SundanceAnserHadarApolloSlurry6475.090404 SundanceApolloSunburstPavoSlurry35208.255079 SundanceHadarCul-de-sac A ns er Slurry 12388.677268 SundanceChenilleStarlightEarly Blue Slurry 3624.776205 SundanceDoveShooting Star Ly ra Slurry 6628.553601 SundanceFifthCaliforniaBeaumontSlurry48282.050341 Tow ncenterFifthBeaumontMichiganMill115594.685995 Tow ncenterMagnolia5th6thMill19133.154572 Tow ncenterOrange5th6thMill19733.31299 Tow ncenter Maple 5th 6th Mill 19765.576621 Tow ncenterChestnut5th6thMill19425.265713 Tow ncenterMichigan5th6thMill19686.888051 Tow ncenterMagnolia6th7thMill30117.93821 Tow ncenterMagnolia7th8thMill17140.035523 Tow ncenterMagnolia8th9thMill20648.414117 Tow ncenterMagnolia9th10thMill18938.276183 Tow ncenterMagnolia10th11thMill20331.714423 Tow ncenterTwelfthBeaumontOrangeMill30917.136295 Tow ncenterTwelfthOrangePalmMill31371.141914 Tow ncenterTwelfthPalmPennsylvaniaMill67342.923061 Tow ncenterMassachusettsSixthEighthMill45548.623171 Tow ncenterMassachusettsEighthTenthMill42311.566338 Tow ncenterMassachusettsTenthEleventhMill19695.985594 Tow ncenterMassachusettsCul-de-sac Thirteenth Mill 33088.257573 Tow ncenterMassachusettsThirteenthCul-de-sac Mill 24053.248241 Tow ncenterThirteenthBeaumontOrangeMill28672.527065 Tow ncenterThirteenthOrangePalmMill28764.056889 Tow ncenterThirteenthPalmMichiganMill31265.190985 Tow ncenterThirteenthMichiganPennsylvaniaMill28179.012359 Tow ncenterLaraineBeaumontBeaumontMill25356.984898 Tow ncenterCyriseSherieOrangeSlurry15743.463718 Tow ncenterSherieCyriseCul-de-sac Mill 5942.45063 Tow ncenterKylieCyriseCul-de-sac Slurry 11958.399644 Tow ncenterDonnaOrangeMapleMill10071.318658 Tow ncenterMapleCul-de-sac Donna Mill 21400.761478 Tow ncenterMapleTwelfthThirteenthMill33362.222364 Tow ncenterCyriseBeaumontSherieMill9942.635491 Tow ncenterFifthMcDonaldsBeaumontMill6385.473953 Tow ncenterEuclidSixthFifthMill20624.527269 Tow ncenterAlley E/o Beamo Six th Seventh Mill- A dditiv e 14220.899936 Tow nCenter #Stree t Cross Stre et/Locati on Corner Case Repai r Descri ption Area (sf)1 6th Beaumont Ave NE A Truncate d Dome s & Top Landing 8126thBeaumont Ave NW A Compl e te Removal and Replacement 20836thBeaumont Ave SW A Truncate d Dome s & N1/2 of Ramp Re moval and Re pl ace me nt 7646thBeaumont Ave SE A Truncate d Dome s56thMagnoliaSWAComplete Removal and Replacement 29466thMagnoliaSEAComplete Removal and Replacement 21376thMagnoliaNEAComplete Removal and Replacement 18886thOrangeSWAComplete Removal and Replacement 17896thOrangeSEAComplete Removal and Replacement 167106thPalmSWAComplete Removal and Replacement 431116thPalmSEATruncated Dome s126thPalmNEATruncated Dome s & Top Landing 15136thPalmNWATruncated Dome s & Top Landing 28146thChestnutSWATruncated Dome s & Top Landing 38156thChestnutSEDComplete Removal and Replacement 161166thMichiganSWAComplete Removal and Replacement 244176thMichiganSEAComplete Removal and Replacement 160186thMassachusetts SW A Compl e te Removal and Replacement 166196thMassachusetts SE A Truncate d Dome s206thMassachusetts NE A Compl e te Removal and Replacement w/ 2 CB 316216thMassachusetts NW A Compl e te Removal and Replacement w/ CB 184226thXeniaSWAComplete Removal and Replacement 315236thXeniaSEAComplete Removal and Replacement 293246thDWY W/O Appl e bee's SW A Truncate d Dome s256thDWY W/O Appl e bee's SE A Truncate d Dome s266thDWY E/O Appl e bee's SW A Truncate d Dome s276thHighland Springs SW A Truncate d Dome s & Top Landing 48286thHighland Springs NW A Compl e te Removal and Replacement 282296thDWY @ Cri cke t NE A Truncate d Dome s306thDWY @ Cri cke t NW A Truncate d Dome s316thAllegheny NE A Truncate d Dome s & Top Landing 19326thAllegheny NW A Truncate d Dome s336thDWY @ Do It Best NW A Truncate d Dome s346thAmericanNWATruncated Dome s & Top Landing 45356thIllinoisNEBComplete Removal and Replacement 201366thIllinoisNWAComplete Removal and Replacement 311376thPennsylvaniaNEAComplete Removal and Replacement 236386thPennsylvaniaNWAComplete Removal and Replacement 324396thMapleNEAComplete Removal and Replacement 200406thMapleNWAComplete Removal and Replacement 195415thMagnoliaNEATruncated Dome s425thMagnoliaNWATruncated Dome s435thOrangeNWATruncated Dome s445thOrangeNEAComplete Removal and Replacement 528455thMapleNWARamp, Truncate d Dome s & Bottom Landi ng 131465thMapleNEATruncated Dome s475thPalmNWAComplete Removal and Replacement 406485thPalmNEAComplete Removal and Replacement 191495thBeaumont Ave SE D Compl e te Removal and Replacement 89505thBeaumont Ave SW A Compl e te Removal and Replacement 186515thBeaumont Ave NW A Compl e te Removal and Replacement 332525thBeaumont Ave NE A Compl e te Removal and Replacement 291535thCaliforniaSEBComplete Removal and Replacement 391545thCaliforniaNEBComplete Removal and Replacement 246555thEdgarNWDComplete Removal and Replacement 84565thEdgarNWDComplete Removal and Replacement 69575thEuclidNWDComplete Removal and Replacement 60585thEuclidNEDComplete Removal and Replacement 525912thBeaumont Ave SE A Truncate d Dome s6012thOrangeSEAComplete Removal and Replacement 1676112thDadashSWAComplete Removal and Replacement 1396212thDadashSEAComplete Removal and Replacement 556313thMassachusetts NE D Compl e te Removal and Replacement 5986413thMassachusetts NW D Compl e te Removal and Replacement 5606513thPalmNEAComplete Removal and Replacement 4906613thMapleSWBComplete Removal and Replacement 4126713thMapleSEBComplete Removal and Replacement 3796813thOrangeSEBComplete Removal and Replacement 3966913thBeaumont Ave NE B Compl e te Removal and Replacement 3727013thBeaumont Ave SE B Compl e te Removal and Replacement 31671CyriseBeaumont Ave SE B Truncate d Dome s72CyriseBeaumont Ave NE A Truncate d Dome s73CyriseSherieSWBComplete Removal and Replacement 39974CyriseSherieSEBComplete Removal and Replacement 40175CyriseKylieSWATruncated Dome s76CyriseKylieSEATruncated Dome s77CyriseOrangeSWATruncated Dome s & Landi ngs 4178CyriseOrangeNWATruncated Dome s79DonnaMapleNWBComplete Removal and Replacement 12080S Larai ne Beaumont Ave SE A Compl e te Removal and Replacement 51281S Larai ne Beaumont Ave NE A Compl e te Removal and Replacement 49282N Larai ne Beaumont Ave SE A Compl e te Removal and Replacement 54183N Larai ne Beaumont Ave NE A Compl e te Removal and Replacement 414 FY23 Stree t Project Ramp Rehabilitation
AC Mill and Overlay Schedule:

Sixth Street: 3" (0.25') Mill and OverlayIntersection of 5th Street and Beaumont Ave: 3" (0.25') Mill and OverlayAll other "Mill" streets: 2" (0.17') Mill and Overlay

Page 358 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
1 TECHNICAL PROVISIONS

TECHNICAL PROVISIONS

TABLE OF CONTENTS
TP01. NOTIFICATION OF RESIDENTS AND BUSINESSES..........................................2 TP02. SOUND REQUIREMENTS .........................................................................................2 TP03. TRAFFIC CONTROL ..................................................................................................3 TP04. WATER POLLUTION CONTROL............................................................................7 TP05. MOBILIZATION........................................................................................................10 TP06. TEMPORARY CONSTRUCTION SIGN.................................................................11 TP07. CONSTRUCTION SURVEY AND MONUMENT PRESERVATION.................11 TP08. CONSTRUCTION WATER.......................................................................................12 TP09. PAVEMENT PREPARATION FOR ALL WORK .................................................12 TP10. ROUT AND SEAL CRACKS.....................................................................................14 TP11. DIG OUTS....................................................................................................................15 TP12. ASPHALT RUBBER AND AGGREGATE MEMBRANE (ARAM).....................16 TP13. SLURRY SEAL ...........................................................................................................17 TP14. COLD MILLING ASPHALT CONCRETE SURFACING....................................20 TP15. EDGE MILLING ASPHALT CONCRETE SURFACING ....................................21 TP16. HOT MIX ASPHALT .................................................................................................21 TP17. TRAFFIC STRIPING AND PAVEMENT MARKINGS........................................22 TP18. PAVEMENT MARKERS...........................................................................................23 TP19. ADJUST VALVE TO GRADE...................................................................................24 TP20. ADJUST MANHOLE TO GRADE ...........................................................................24 TP21. CONCRETE REMOVAL...........................................................................................25 TP22. MINOR CONCRETE (RAMPS)................................................................................25 TP23. CURB RAMP DETECTABLE WARNING SURFACE..........................................26 TP24. GUARANTEE..............................................................................................................27

Page 359 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
2 TECHNICAL PROVISIONS
TP01. NOTIFICATION OF RESIDENTS AND BUSINESSES

The Contractor shall provide notice of the work, in person and with printed notification (in English and Spanish language), at least ten (10) working days prior to commencing construction activities, to all agencies, firms, institutions, postal service, residents, Transit Authorities, schools, stores, utilities and waste disposal service providers fronting or affected by the work. Additional printed notification (in English and Spanish language) shall be given not less than forty-eight (48) hours prior to performing any work which will restrict property access, close or partially close the street, or which will restrict or disallow street parking. All schools and churches shall receive seven (7) working days notification prior to performing any work which will restrict property access.

The Contractor shall coordinate with the school district for pick-up and drop-off of school children, with the transit authority for the pick-up and drop off of riders, with waste collection/disposal service providers, with the US postal service to ensure delivery of mail, and with churches for weekly or special activities.

The printed notices shall contain a general description of the work to be done and the date that the work is to be done. The notices shall also include a statement that parking will be restricted as called for on the "NO PARKING" signs to be posted along the street. All public notices must be reviewed and approved by the Resident Engineer prior to its distribution.

The Contractor shall also post printed "NO PARKING-TOW AWAY" signs at one-hundred-foot (100') maximum spacing along each side of the affected street for forty-eight (48) hours prior to the commencement of the street improvement work. The Contractor shall document the day, date and time the "NO PARKING" signs were posted. Posting of signs on trees and utility poles will not be allowed.

The signs shall contain the day, date, hours and vehicle code section reference that parking will be prohibited on that particular street, CVC 22651L and CVC 22654D. Signs that prohibit or restrict parking shall be removed immediately upon completion of work in the restricted or prohibited area.

The printed notices and the "NO PARKING" signs shall be furnished by the Contractor.

Payment: Full compensation for compliance with the preceding requirements shall be considered as being included in the various Contract items in the bid schedule and no additional compensation will be allowed therefor.

TP02. SOUND REQUIREMENTS
Sound control shall conform to General Conditions Article 25 and the provisions in Section 3-12.2, "Noise Control," of the Standard Specifications and these special provisions.

Page 360 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
3 TECHNICAL PROVISIONS
The noise level from the Contractor's operations, between the hours of 9:00 p.m. and 6:00 a.m., shall not exceed 86 dBA at a distance of 50 feet. This requirement shall not relieve the Contractor from responsibility for complying with local ordinances regulating noise level.

The noise level requirement shall apply to the equipment on the job or related to the job, including but not limited to trucks, transit mixers or transient equipment that may or may not be owned by the Contractor. The use of loud sound signals shall be avoided in favor of light warnings except those required by safety laws for the protection of personnel.

Payment: Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore.

TP03. TRAFFIC CONTROL
Traffic controls, including but not limited to, vehicular and pedestrian traffic controls, maintenance of vehicular and pedestrian access through work areas, detours, and street closures shall be in accordance with these Technical Provisions, Special Provisions; Traffic Control Plans; California MUTCD, Part 6, Temporary Traffic Control, Caltrans adopted 2014; the current "Work Area Traffic Control Handbook"; and Subsection 7-10, of the current "Standard Specifications for Public Works Construction," including all its subsequent amendments. Nothing in the Special Provisions shall be construed as relieving the Contractor from its responsibility to provide for the safety and convenience of traffic and the public during construction.

In the event of conflict, the order of precedence shall be as follows:

1. Special Provisions

2. Traffic Control Plans

3. California Manual on Uniform Traffic Control Devices, Part 6, Temporary Traffic Control, Caltrans adopted 2014.

4. Work Area Traffic Control Handbook. (WATCH)

5. Standard Specifications
Traffic Control shall be in accordance with the following Special Provisions:

1. All streets shall remain open to through traffic at all times. Street closure is not allowed except as approved by the Engineer. The contractor shall obtain written permission from City Engineer at least ten (10) day prior to road closure. The Contractor shall make provisions to allow local traffic access to the closed streets. The local traffic consists of, but is not limited to, residences, church congregations, farmers, post offices, meter readers, trash pickup, school buses, and emergency vehicles. The Contractor shall provide a smooth travel way and either a flagger and/or signing to direct traffic.

2. The Contractor shall be responsible for the preparation of Traffic Control Plans as necessary for the work. The Traffic Control Plans shall be signed and stamped by a

Page 361 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
4 TECHNICAL PROVISIONS
California Registered Traffic Engineer and transmitted to the City for approval no later than fourteen (14) calendar days prior to the scheduled commencement of work.

Comments and corrections shall be returned to the Contractor within five (5) working days. The Traffic Control Plans shall conform to the requirements listed in these Technical Provisions; California MUTCD Part 6, Temporary Traffic Control; the Work Area Traffic Control Handbook; and the Standard Specifications.

3. All traffic controls and safety devices, equipment and materials, including but not limited to cones, channelizers, delineators, flashing warning lights, barricades, high level warning devices (telescoping flag trees), flags, signs, markers, portable barriers, temporary railing (Type-K), temporary fencing, flashing arrow signs, changeable message sign, markings, and flagging equipment shall be provided and maintained in “like new” condition.

4. The Contractor shall furnish and properly install, construct, erect, use and continuously inspect and maintain, twenty-four (24) hours per day, seven (7) days per week, which includes holidays, all said devices, equipment and materials and all temporary and permanent pedestrian and driving surfaces as necessary to provide for the safety and convenience of, and to properly warn, guide, control, regulate, channelize and protect the vehicular traffic, pedestrian traffic, project workers, and the public throughout the entire limits of the work activity and beyond said limits as necessary to include areas affecting or affected by the work, from the date of Notice to Proceed to the completion and acceptance of the work.

5. High-level warning devices (telescoping flag trees) are required at all times for work being performed within the roadway unless otherwise specifically approved by the Engineer.

6. All barricades shall be equipped with flashing warning lights, and all traffic cones shall be no less than 711mm (28“) in height, except that shorter cones, 305 mm (12“) minimum height, may be permitted during striping maintenance operations where the only function of the cone is to protect the wet paint from the traffic.

7. The entire area of orange and white stripes for barricades shall be Type I, engineering grade, or Type II, super engineering grade, retro-reflective sheeting conforming to the requirements of ASTM Designation: D 4956-95.

8. Type III barricades, no less than 1.83 m (6’) in length and equipped with two (2) Type “N” markers each and two (2) portable flashing beacons each, shall be used to close streets, except as otherwise specifically approved by the Engineer for minor maintenance work of no more than one (1) working day’s duration, on weekdays, or on holidays only, and limited to the hours between 8:30 a.m. and 3:30 p.m. Said barricades shall be placed across the full roadway at each point of closure with the distance between barricades, or between barricades and curbs, not exceeding 3’ except that one (1) 11’ wide gap between barricades shall be provided at the center of the street. Barricades to the right of the street’s center, facing the inbound vehicular traffic, shall also be equipped with one (1)

Page 362 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
5 TECHNICAL PROVISIONS
R11-2, “Road Closed” sign, one (1) R11-4, “Road Closed to Thru Traffic,” sign, and a Type P warning sign.

9. Channelizers shall be surface mounted type and shall be furnished, placed and maintained at the locations shown on the Plans or as approved by the Engineer, and shall conform to the provisions in Subsection 12-3.07, “Channelizers,” of the State of California Standard Specifications and these Special Provisions.

10. When no longer required for the work as determined by the Engineer, channelizers (except channelizers to be left in place), and underlying adhesive used to cement the channelizer bases to the pavement, shall be removed. Removed channelizers and adhesive shall become the property of the Contractor and shall be removed from the site of work.

11. Reflectorized (both sides) temporary self-adhesive markers, 100mm (4in) wide, shall be applied to unstriped pavement surface before opening the travel way to public traffic.

Reflectorized temporary yellow markers shall be used for to delineate the centerline to separate opposing traffic. Reflectorized temporary white markers shall be used to delineate lanes of travel and placed in 600mm (24in) intervals transverse to the road to delineate stop bars and limit lines.

12. The reflectorized temporary markers shall be removed the same day the first coat of striping has been placed on the pavement. The removal of the markers shall be done such a way that the pavement is not damaged.

13. Except as otherwise approved by the Engineer, two-way vehicular traffic shall be maintained at all times within two (2) 11’ wide lanes on streets having an effective roadway width of 44’ or more with restricted parking. Other streets of lesser widths may be reduced to one (1) 12’ wide lane with work activity being limited to one side at a time, and the one-way vehicular traffic being maintained at all times by properly trained and experienced flaggers. All lane closures shall have flashing arrow signs to provide additional, high level, advanced warning.

14. No reduction of the traveled way width shall be permitted on any City street before 9:00 a.m. or after 3:30 p.m., on weekends or holidays, or when active work is not being done, unless otherwise approved by the Engineer.

15. Properly trained and experienced flaggers shall be provided to direct traffic when said traffic is to be interrupted, when two-way traffic is to be reduced to one-way traffic, and at other such times as is necessary to safely pass traffic through or around the work area and when so directed by the Engineer.

16. Vehicular access to occupied residential property may be restricted on weekdays, other than holidays, between the hours of 8:30 a.m. and 3:30 p.m. while essential work activity is taking place only upon approval by the Engineer and providing the Contractor gives

Page 363 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
6 TECHNICAL PROVISIONS
the property owner or resident at least forty-eight (48) hour advance written and oral notice.

17. Convenient and safe pedestrian access to schools, churches, occupied residential and business property shall be maintained at all times. Access to mailboxes shall be maintained at all times such that the postal delivery service is not interrupted. Trash pick- up services shall not be interrupted. Access to vacant and unused property may be restricted when approved by the Engineer. Both vehicular and pedestrian access shall be maintained at all times to all other property except as otherwise specifically authorized in writing by the Engineer.

18. Vehicular access to business, school and church driveways shall be maintained at all times during construction.

19. Traffic control and safety devices and equipment being used that becomes damaged, destroyed, faded, graffitied, encrusted, soiled, misplaced, worn out, inoperative, lost, or stolen shall be promptly repaired, refurbished, or replaced. Traffic control and safety devices and equipment being used, that are displaced or not in an upright position from any cause, shall be promptly returned or restored to their proper position.

20. An unobstructed view of all signs and warning devices including, but not limited to, stop signs, stop ahead signs, street name signs, and other regulatory, warning and construction signs, markers, and warning devices shall be maintained at all times. All speed limit signs shall be black on white with signs at either end of the project notifying the motoring public that fines are doubled in construction zones. No trucks or other equipment or materials shall be stopped, parked, or otherwise placed so as to obscure said signs, markers and devices from the view of the vehicular and pedestrian traffic to which it applies.

21. When entering or leaving roadways carrying public traffic, the Contractor’s equipment, whether empty or loaded, shall yield to said public traffic at all times, except where the traffic is being controlled by police officers, fire officers, properly trained and experienced flaggers, or at traffic signalized intersections.

22. Stockpiling or storage of materials on any public right-of-way or parking area will not be allowed without the specific written permission of the Engineer. Materials spilled along or on said right-of-way or parking area shall be removed completely and promptly. All stockpile and storage areas shall be maintained in a safe, neat, clean, and orderly condition, and shall be restored to equal or better than original condition upon completion of the work.

23. On projects involving work on, closure of, or partial closure of existing streets, and where vehicular access to the abutting property must be restricted, the work shall be so selected, arranged and scheduled that the person(s) requiring access to said abutting property and residents along said streets affected will be able to park within a reasonable distance of not more than 500’ from their homes or destination. In addition, no two adjoining streets

Page 364 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
7 TECHNICAL PROVISIONS
shall be closed at the same time, except as otherwise approved by the Engineer. Residents must be given written notice of such restrictions a minimum of 48 hours in advance.

24. When work has been completed on a particular street or has been suspended or rescheduled, and said street is to be opened to vehicular traffic, all equipment, “NO PARKING” signs, other obstructions, and unnecessary traffic control devices and equipment shall be promptly removed from that street, except as otherwise approved by the Engineer.

25. Should the Contractor be neglectful, negligent, or refuse, fail, or otherwise be unavailable to promptly, satisfactorily, and fully comply with the provisions specified and referred to herein above, the City reserves the right to correct or mitigate any situation, that in the sole opinion of the Engineer, constitutes a serious deficiency or serious case of noncompliance, by any means at its disposal at the Contractor’s or permittee’s expense, and shall deduct the cost therefore from the Contractor’s progress or final payments.

Such corrective action taken by the City shall not reduce or abrogate the Contractor’s legal obligations and liability for proper traffic control and safety measures and shall not serve to transfer said obligations and liabilities from the Contractor to the City or the City’s agents.

26. Streets determined to be major thoroughfares by the Engineer shall undergo construction in stages, or as approved by the field inspector, to allow at least one 10 ft. wide traffic lane for each direction of travel at all times. The Engineer will approve street closures for construction, as necessary, based on the approved construction schedule.

27. Violations of any of the above Provisions or provisions of the referenced publications, unless promptly and completely corrected to the satisfaction of the Engineer, shall, at the sole discretion of the City, be grounds for termination of the Contract, or shut down or partial shutdown of the work, without compensation to the Contractor or permittee, or liability to the City, all as prescribed by contractual obligation or State law, whichever is applicable.

EXCEPTION: Contractor may not work on a street that is in front of a school between the hours of 7:00 AM and 3:30 PM. Monday through Friday unless written authorization is given by the City Engineer. All streets abutting a schoo l ground can only be worked on during weekends.

Payment: Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore.

TP04. WATER POLLUTION CONTROL
Throughout the term of this contract, the total soil disturbance area of the project site shall be less than 1 acre. The Contractor shall comply with the Area-Wide Municipal Stormwater Permit NPDES No. CAS 618033, hereafter referred to in this section as the “Municipal Permit”, issued by the California Regional Water Quality Control Board (CRWQCB) – Santa Ana Region. This

Page 365 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
8 TECHNICAL PROVISIONS
Permit regulates both stormwater and non-stormwater discharges associated with Contractor’s construction activities. A copy of the Permit may be obtained on the internet at:
http://www.waterboards.ca.gov/santaana/

The Contractor shall comply with the requirements of the Municipal Permit, and all other applicable federal, state and local laws, ordinances, statues, rules, and regulations concerning water pollution control.

The WPCP shall include Fact Sheets for all selected project BMPs.

Contractor’s Water Pollution Control Program (WPCP) shall be prepared by a Qualified SWPPP Developer in accordance with Section 3, “Preparing a Water Pollution Control Program (WPCP)”, of the Caltrans Stormwater Pollution Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP) Preparation Manual (June 2011), which is available as a free download from:
http://www.dot.ca.gov/hq/construc/stormwater/manuals.htm

WATER POLLUTION CONTROL MEASURES
A. Work having the potential to cause water pollution shall not commence until the Contractor’s WPCP has been reviewed and approved by the Engineer. The Engineer’s review and approval of the Contractor’s WPCP shall not waive any contractual requirements and shall not relieve the Contractor from achieving and maintaining compliance with all federal, state, and local laws, ordinances, statues, rules, and regulations. A copy of Contractor’s WPCP shall be maintained onsite. When the WPCP or access to the construction site is requested by a representative of a federal, state, or local regulatory agency, Contractor shall make the WPCP available and Contractor shall immediately contact the Engineer. Requests from the public for the Contractor’s WPCP shall be directed to the Engineer.

B. Contractor’s WPCP shall describe the Contractor’s plan for managing runoff during each construction phase. Contractor’s WPCP shall describe the Best Management Practices (BMPs) that will be implemented to control erosion, sediment, tracking, construction materials, construction wastes, and non-stormwater flows. BMP details shall be based upon California Stormwater Quality Association’s (CASQA) California Stormwater Quality BMP Handbook Subscription Portal ( http://www.cabmphandbooks.com) or the Caltrans Construction Site BMP Manual
https://dot.ca.gov/programs/construction/storm-water-and-water-pollution-control/manuals- and-handbooks
Contractor’s WPCP shall describe installation, operation, inspection, maintenance, and monitoring activities that will be implemented for compliance with the Municipal Permit and all applicable federal, state, and local laws, ordinances, statutes, rules, and regulations related to the protection of water quality.

C. The Contractor’s WPCP preparer shall have been trained to prepare WPCPs or SWPPPs and shall have previous experience with preparing SWPPP or WPCP requirements on a previous project.

Page 366 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
9 TECHNICAL PROVISIONS
The Contractor shall designate a Water Pollution Control Manager that shall have been trained to implement WPCP or SWPPP requirements. Contractor's Water Pollution Control Manager shall:

1. Be responsible for all water pollution control work.

2. Be the Engineer's primary contact for all water pollution control work.

3. Have the authority to mobilize resources (crews, supplies, equipment, etc.) to make immediate repairs of water pollution control measures or to supplement water pollution control measures to maintain compliance with all federal, state, and local laws, ordinances, and regulations related to the protection of water quality, including the Municipal Permit.

The WPCP shall contain all required and applicable certifications and evidence of training for the Water Pollution Control Manager, WPCP Developer, and all other employees working on the project receiving formal training or certification.

D. Water Pollution Control Training: Contractor shall provide water pollution control training to Contractor's employees and subcontractors prior to their performing work on the work site.

The water pollution control training shall be appropriate to the employee or subcontractor function and area of responsibility and shall address (as applicable):

1. Erosion Control (water and wind)

2. Sediment Control

3. Tracking Control

4. Materials & Waste Management

5. Non-Stormwater Discharge Management

6. Run-on and Run-off Control
E. Monitoring and Reporting: Observations and inspections conducted by the Contractor's Water Pollution Control Manager shall be documented on the Construction Site Inspection Checklist included in Contractor's WPCP. A copy of each completed Construction Site Inspection Checklist shall be submitted to the Engineer within 24 hours of conducting the inspection General Requirements:

In the event the City incurs any Administrative Civil Liability (fine) imposed by the CRWQCB – Santa Ana Region, the State Water Resources Control Board, or EPA, as a result of Contractor’s failure to fully implement the provisions of “Stormwater and Non-Stormwater Pollution Control”, the Engineer, may, in the exercise of his sole judgment and discretion, withhold from payments otherwise due Contractor a sufficient amount to cover the Administrative Civil Liability including City staff time, legal counsel, consultant support costs and all other associated cost.

The Contractor shall be responsible for all costs and for any liability imposed by law as a result of the Contractor’s failure to comply with the requirements set forth in “Water Pollution Control”, including but not limited to, compliance with the applicable provisions of the Caltrans Handbooks, Municipal Permit, Federal, State, and local regulations. For the purpose of this paragraph, costs and liabilities include, but not limited to, fines, penalties, damages, and costs associated with defending against enforcement actions whether taken against the City or the Contractor, including those levied under the Federal Clean Water Act and the State Porter-Cologne Water Quality Act.

Page 367 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
10 TECHNICAL PROVISIONS
Within fifteen (15) working days after the award of the contract, the Contractor shall submit two (2) copies and one pdf file of the WPCP to the Engineer for review and approval. The Contractor shall allow ten (10) working days for the Engineer to review the WPCP. If revisions are required as determined by the Engineer, the Contractor shall revise and resubmit the WPCP within three (3) working days of receipt of the Engineer’s comments and shall allow ten (10) working days for the Engineer to review the revisions. The Contractor shall submit four (4) copies of the pproved WPCP and one pdf. file to the Engineer prior to notice to proceed. The Contractor must have an approved WPCP prior to the notice to proceed.

Unless otherwise directed by the Engineer or specified in these Special Provisions, the Contractor’s responsibility for WPCP implementation shall continue throughout any temporary suspension of work.

The Engineer may withhold progress payments or order the suspension of construction operations without an extension of the contract time, if the Contractor fails to comply with the requirements of “Water Pollution Control” as determined by the Engineer.

All BMP repairs shall be implemented by the Contractor within 72 hrs of notification by engineer.

Payment: Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore.

TP05. MOBILIZATION
Mobilization shall conform to General Conditions, Article 45 and the following:

Mobilization shall consist of preparatory work and operations, including, but not limited to those necessary for the movement of personnel, equipment, supplies and incidentals to the project site and for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items on the project site.

De-mobilization shall consist of the completion of all final construction and administrative work required to secure the project for termination and acceptance by the Engineer, including, but not limited to the following:

1. Satisfactory completion of Finishing Roadway;

2. Removal of all temporary facilities, construction office, temporary utilities, temporary BMPs, plant, equipment, surplus material, construction debris and similar from project limits and adjacent property, as required and as directed by the Engineer;

3. Restoration of all temporary roads and haul routes and construction storage and office areas, etc. to original or better condition;

4. Completion of record of drawings (as-built), to the satisfaction of the Engineer;

5. Submission of final certified payroll documents to the Engineer;

Page 368 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
11 TECHNICAL PROVISIONS

6. Completion of the requirements of permits issued by other agencies;

7. Satisfactory completion of all other contractually and legally required construction and administrative items of work.

Payment: Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore.

TP06. TEMPORARY CONSTRUCTION SIGN
The Contractor shall install a temporary construction sign at the project limits, as approved by the Engineer. The contractor shall relocate the signs as work transitions from area to area or as directed by the City Engineer.

Project signs shall conform to the following requirements:
Outside sign dimensions shall be 4' x 8'; material shall be 3/4" marine grade plywood substrate painted white both sides and edges, or approved equal, with 1" wide black border Printing shall be black, except city logo, using latex or eco solvent UV inhibited ink City will provide "initial proof" layout in digital format. Contractor shall provide "final proof" layout for Public Works approval.
Contractor shall provide photo of actual sign to city for approval prior to installation Contractor shall install signs at project site at locations approved by engineer Sign shall be securely mounted on 2 - 4"x4" wood posts set 5'(min) into stable earth. Sign shall be 18" (min) clear of vehicular and pedestrian travel ways. Bottom of sign shall be 7' (min) above finished grade.
Contractor shall be responsible to maintain sign in good condition, graffiti free, for the duration of the project and at the completion of the project shall remove the sign and posts, restore area to pre-existing condition, and deliver sign to the Public Works Department.

Payment: Full compensation for project signs shall be made at the contract amount for each sign, and shall include full compensation for, but not limited to, furnishing all labor, materials, tools, equipment, relocation, and incidentals, for doing all work involved and no additional compensation will be allowed therefor.

TP07. CONSTRUCTION SURVEY AND MONUMENT PRESERVATION
Construction Survey, Staking and Monument Preservation includes qualified personnel, equipment, and supplies required for, but not limited to Project control, grading, paving, tie out of all centerline monuments, replacement of disturbed monuments, and additional items included in the contract documents.

The Contractor shall employ engineers or surveyors to perform adequate surveys and staking necessary to construct the work to the proper lines and grades. Reconstructed asphalt concrete surfaces shall have a cross slope between 1.5% and 5%. New curb & gutter shall have a minimum slope of 0.5%. Grade breaks must be spaced a minimum 25’ apart and be no greater than 0.25%.

Page 369 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
12 TECHNICAL PROVISIONS
Copies of the field notes, cut sheets or diagrams used in setting stakes shall be promptly furnished to the Engineer.

The contractor will be responsible to provide pre and post-construction corner records for the City to file with Riverside County.

Payment: Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore.

TP08. CONSTRUCTION WATER
The Contractor shall obtain construction water from Beaumont Cherry Valley Water District.

Temporary construction water meters are available from the District. These meters will require the Developer/Contractor make application at the District offices and pay all the required deposits/fees.

Payment: Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore.

TP09. PAVEMENT PREPARATION FOR ALL WORK
Work shall consist of preparing the existing bituminous pavement to receive any of the designated treatments and shall include, but not be limited to, weed killing, pothole repair and surface preparation as required in the Standard Specifications and these Special Provisions. The existing AC pavement exposed after cold milling shall be evaluated by Engineer and Contractor to determine extent of crack sealing and pothole repair.

Weed Killing:

Work shall consist of killing and removing weeds and other organic materials from the existing cracks, joints and random cracks in asphalt concrete surfaces and the adjacent curbs and gutters.

Contractor shall spray weed killer in all cracks, crevices and potholes with Monsanto brand Roundup (or approved equal) in accordance with the manufacturer’s instructions a minimum of fourteen (14) calendar days prior to crack sealing work. All weeds shall be re-sprayed if rain occurs within 48 hours after application. The herbicide mixture shall contain Blazon, or approved equal, a purple dye to easily confirm the herbicide has been applied. The Contractor shall remove any and all weeds that are growing through cracks from the project street located and growing within the pavement, between the concrete gutter and the pavement and in the curb and gutter to the back of curb. The contractor shall take additional care when spraying adjacent to landscape areas to assure that no overspray occurs behind the curb.

Payment for weed killing/herbicide application and weeds removal shall be included in the price paid for other items of work and shall include full compensation for all labor, tools, materials,

Page 370 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
13 TECHNICAL PROVISIONS
equipment, disposal of loose materials and incidentals for doing work involved and no separate or additional compensation will be allowed therefor.

Crack Sealing:

Refer to separate item for crack sealing.

Pothole Repair:

Work shall consist of cleaning and permanently repairing existing potholes in bituminous pavement beneath the areas receiving any surface treatment. For mill areas, potholes shall be assessed after milling operations. Voids in the surface of existing bituminous pavement greater than 1 inch and extending deeper than 1 inch shall be filled prior to receiving pavement treatment. Prior to Contractor placing surfacing materials Contractor shall fill or repair all potholes.

Pothole is the replacement of lost bituminous material only. Repairs shall be made where potholes are existing.

Potholes with no dimension larger than 16 inches in any direction or more than 4 inches deep may be repaired by replacing lost material with AC (HMA), D1-PG64-10 per 203-6.4 and placing such material per section 302-5 all of the Standard Specifications, except AC may be manually deposited, distributed and spread. Alternatively lost material may be replaced with “Perma-Patch”, or approved equal, repair material as supplied by Perma-Patch, Inc. 6123 Oakleaf Ave Baltimore, MD 21215 and placed per manufacturer’s directions. All pothole edges shall be cleaned back to sound bituminous material and pothole cleaned thoroughly as described above for crack sealing. Replaced material shall be compacted to a uniform smoothness and 95% density, level with surrounding pavement, per section 302-5.6 of the Standard Specifications by use of self-propelled roller or vibratory plate compactor.

Payment for repairing potholes in this manner shall be included in the price paid for other items of work and shall include full compensation for furnishing all labor, traffic control, materials, tools, and equipment, and incidentals for, cleaning and routing cracks, disposal of loose materials, no separate or additional compensation will be allowed therefor.

Removal of Existing Pavement Striping, Markings and Legends and Raised Pavement Markers:

Contractor shall remove all existing thermoplastic and painted pavement striping, markings and legends and raised pavement markers to a clean surface level with the adjacent pavement prior to construction of an AC overlay.

Payment for such removal shall be included in the price paid for other items of work and shall be full compensation for, but not limited to, furnishing all labor, materials, tools, equipment, and incidentals, for doing all work involved and no separate or additional compensation will be allowed therefor.

Page 371 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
14 TECHNICAL PROVISIONS
TP10. ROUT AND SEAL CRACKS
All cracks shall be filled with a rubberized asphalt material that has a minimum softening point temperature of 200° Fahrenheit and a safe heating temperature of 380° Fahrenheit, or as otherwise directed by the Engineer.

1. For cracks in size of 1/8 inch to 3/8 inch in width, the crack shall be widened using a router to form a sealant reservoir which is a minimum of 1/2 inch wide and 3/4 inch to 1 inch deep.

The routed crack shall then be cleaned with hot compressed air to remove all dust and free moisture, and then sealed to service level. Pavement surfaces receiving the Chip seal will not require crack sealing for the crack size specified of 1/8 inch to 3/8 inch wide.

2. Cracks that are more than 3/8 inch but less than 3/4 shall be cleaned for the entire crack depth using sandblasting, brushing and hot air blowing techniques, as required to provide a crack free from all debris, dust, loose material and moisture. Gauging or plowing may be required to remove incompressible deep in the crack. The clean crack shall be filled with sealant, from the bottom up to surface level, in a manner which does not result in sealant bridging or entrapped air pockets. With deep cracks, settlement of sealant may occur, thus requiring application of a second layer of sealant material. For cracks with depressed surfaces on each side of the crack shall be over filled beyond level with pavement surface and then squeezed to fill in depressed area. No more than a 2" wide and 1/16" thick strip of material may be applied to the pavement surface. The crack seal for the specified width of 3/8 inch to 3/4 inch shall apply to all pavement surfaces

3. Cracks wider than 3/4 inch and potholes shall be cleaned using sandblasting or other cleaning technique approved by the Engineer. The cracks and/or potholes shall then be filled with pea- gravel size hot mix asphalt concrete as directed by the Engineer. Filling cracks and potholes shall apply to all pavement surfaces

4. No slurry or ARAM material shall be placed until after the crack seal and/or fill material has been in place for a minimum of five (5) calendar days.

5. Where cracks form a raised lip, ripple, or ridge the crack shall be routed or milled to remove the raised portion.

6. For mill areas, the crack seal shall be performed after the milling and prior to the placement of an ac overlay.

Payment: Payment for crack treatment shall be included in the price paid for other items of work and shall include full compensation for all the work performed including crack cleaning, crack filling, as specified in these technical Provisions, and as directed by the Engineer and no additional compensation will be allowed therefor.

TP11. DIG OUTS
The inspector and Engineer are to field verify each asphalt dig out location. All asphalt dig-out areas are to be field marked by the inspector and approved by the engineer.

Page 372 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
15 TECHNICAL PROVISIONS
Upon identification of the dig out locations, the contractor shall be responsible for;

1. grinding or full depth saw cutting and excavating the existing pavement/ to a minimum of four inches (4”) below the treatment method surface. No additional compensation will be made for excavation beyond the 4”.

2. For Slurry Seal treatment areas: Cold milling all edges of dig out area a minimum of 12” beyond edge a depth of 0.1’.

3. For mill and overlay areas: no edge milling necessary. The minimum thickness shall not include the overlay thickness.

4. Contractor shall place 4” of AC B-PG 64-10 Base course. The contractor shall notify the inspector for any areas unable to meet compaction requirements.

5. Placement of 4” of asphaltic concrete per Hot Mix Asphalt technical provision. Sides at all patching locations shall be tack-coated immediately prior to placement of asphalt concrete.

Asphalt concrete used for dig outs shall be included in the digout unit cost and not included in any other item.

Payment: Full compensation for fixing pavement failures in this manner shall be made at the contract unit price paid per square foot for dig outs, and shall include full compensation for, but not limited to, furnishing all labor, materials, tools, equipment, and incidentals, for doing all work involved.

TP12. ASPHALT RUBBER AND AGGREGATE MEMBRANE (ARAM)
ARAM shall be in conformance with section 302-11 “Asphalt Rubber and Aggregate Membrane“, section 203-12 “Asphalt Rubber and Aggregate Membrane (ARAM), and section 302-10 “Asphalt Rubber and Aggregate Membrane (ARAM)”, and all subsequent sections of the Standard Specifications.

Cul-de-sacs, up to the beginning of the curb radius, stop points and other areas as designated, shall have a modified asphalt rubber binder applied pursuant to the application rates set forth in these specifications, modified with a polyethylene polymer additive added to the asphalt rubber binder between 2 percent and 4 percent by weight of the asphalt rubber binder.

The modified asphalt rubber binder shall have a Performance Grade (PG) rating of between 88 and 94. The modified asphalt rubber binder specified above is subject to the provisions of United States Patent No. 9,828,505 B2.

Pavement heaters shall be utilized after cover aggregate application and before rolling on all surfacing receiving the modified asphalt rubber binder to ensure complete embedment and adhesion of the cover aggregate to the modified asphalt rubber binder. In no event, shall the surface temperature of the cover aggregate and modified asphalt rubber binder be heated to above 275˚F. The process method for heating specified above is subject to the provisions of United States Patent No. 7,033,104 B2.

Type 2 slurry seal shall be applied to ARAM a minimum of five days after initial placement of ARAM. Final sweeping of ARAM shall occur prior to slurry.

Page 373 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
16 TECHNICAL PROVISIONS
All areas of
Payment: Full compensation for ARAM shall be made at the contract unit price paid per square foot and shall include full compensation for furnishing all labor, edge milling, materials, tools, and equipment, and for doing all the work involved, complete in place, and no additional compensation will be allowed therefor.

Compensation for slurry seal shall be made per separate slurry seal bid item.

TP13. SLURRY SEAL
Slurry seal shall be performed in accordance with sections 203-5 and 302-4 “Emulsion- Aggregate Slurry,” of the Standard Specifications and the following provisions:

Slurry over ARAM shall be applied at the application rate of 15lbs/yd2 minimum and 18lbs/yd2 maximum.

Materials:

Emulsion aggregate slurry shall be Type II. Emulsified asphalt shall be CQS-1h.

Subsection 203-5.4.2, “Materials” of the Standard Specifications is modified as follows - (2) Admixtures, such as Portland Cement or aluminum sulfate may be mixed into the slurry material to adjust the curing time such that the applied slurry can support vehicular traffic within 2 hours.
(5) Use of slag shall not be permitted.
(6) Deliveries of aggregate and emulsion shall not be made without the Engineer present.

Page 374 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
17 TECHNICAL PROVISIONS
Modify the first paragraph of Subsection 203-5.2, “Mix Design,” of the Standard Specifications to include the following:

The Contractor shall provide materials for verification of the Mix Design. Periodically throughout the project, at the direction of the City Engineer, will perform further testing as necessary to provide assurance of the Mix Design.

If the Contractor changes sources of material, i.e. aggregate and/or oil, a new Mix Design shall be resubmitted. The cost of all Mix Design retest and testing as a result of changes to the Mix Design shall be borne by the Contractor.

Prior to a change of emulsion, the Contractor shall thoroughly clean all emulsion tanks and mixing units to prevent any chemical reaction between the two emulsions.

The latex additive shall be Ultra Pave 65 K (for cationic) or an approved equal. The latex shall be added at the emulsion plant after weighing the asphalt and before the addition of mixing water.

The latex shall be added at a rate of two and a half (2.5) parts to one-hundred (100) parts of emulsion by volume (or 2.5%).

Stockpile:

Prior to the beginning of slurry operations, the Contractor shall furnish, at no cost to the City, current licensed weigh master’s certificates indicating the net weight capacity of the aggregate bin.

Prior to storing aggregate on private property, the Contractor shall submit to the Engineer written permission from the property owner for such stockpiling.

Precautions shall be taken to ensure that stockpiles do not become contaminated with oversized rock, clay, silt, or excessive amounts of moisture. The stockpiles shall be kept in areas that drain readily. Segregation of the aggregate will not be permitted.

The stockpile areas shall be thoroughly cleaned of all excess material and left in a neat, orderly appearance upon completion of slurry operations in any area.

Application:

The pavement surface shall be cleaned by sweeping, flushing, or other means necessary to remove loose particles of paving, dirt, aggregate, and any other extraneous materials. This must be performed to the satisfaction of the Engineer before any slurry seal material is placed; including the placement of slurry seal test strips.

Surface oil and grease shall be removed prior to the application of the slurry seal.

Subsection 302-4.3, “Continuous-Flow Mixers,” of the Standard Specifications shall be revised to include the following:

Page 375 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
18 TECHNICAL PROVISIONS
All slurry mixing machines shall be equipped with a Fines Feeder for the adding of cement or granular Aluminum Sulfate.

Transit mix trucks shall not be used.

The slurry shall be applied in such a manner that no ripples or waves exist. If ripples or waves occur in the slurry during the application, the work shall cease and the Contractor shall correct the situation. The Contractor may use a drag to knock down ridges. If ripples or waves are not corrected to the Engineer’s satisfaction, the street shall be reslurried at the Contractor’s expense.

No slurry seal shall be placed on a wet street or crossing without the Engineer's consent.

Intersections and commercial driveways shall be completed in two parts to allow ingress and egress to traffic. Sand may be spread over the fresh slurry only with the permission of the Engineer.

The Contractor shall be required to work around all existing utility facilities and to seal up to the edge of such facilities. Slurry shall not be applied over any manhole, valve, survey monument, or miscellaneous frames and covers. It shall be the Contractor’s responsibility to cooperate with the owner of the facility and to place protective covering over, or to otherwise avoid slurry seal coating of manholes, utility covers, concrete gutters, concrete cross gutters, and drainage facilities, and survey monuments. Any material used to protect such devices shall be removed and disposed of lawfully by the Contractor.

All thermoplastic pavement striping, markings, legends and raised pavement markers (reflective and non-reflective) shall be removed prior to construction slurry seal.

Rubber Tire Rolling - Rolling shall be performed with two complete coverages by a 12-ton nine- wheel rubber tired roller with a tire pressure of 50 psi. Rolling shall be performed after slurry and as soon as it sets up enough to support the roller and not pick up on the tires.

Areas of shade on the pavement that set up more than 10 minutes later than other areas shall be rolled separately, but as soon as they set up sufficiently to meet the requirements herein.

Insufficient rubber-tire rollers to meet these requirements shall be cause for termination of slurry operations until rolling can keep pace with slurry spread.

Contractor shall sweep the streets for two (2) consecutive days after the application of the slurry.

A third and final sweeping shall be done five to eight days after the slurry is complete. Residual material picked up from the sweepings shall be removed to a legal disposal site.

The Contactor shall protect the wet slurry from traffic at all times and if damaged or defaced, the Contractor shall repair said damage at no additional cost to the City.

The placement of slurry seal may be suspended with the concurrence of the Engineer due to unsuitable weather, temperature conditions, or other conditions that are considered unfavorable

Page 376 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
19 TECHNICAL PROVISIONS
for the prosecution of the work. The Contractor shall immediately comply with the order of suspension by the Engineer, and work shall not be resumed until authorized by the Engineer.

The days during which the suspension of work is in effect due to unsuitable weather shall not be considered working days and the date of completion shall be extended to allow for work and notification. In the event of a suspension of work, the Contractor shall remove all barricades, equipment and “No Parking” signs (if appropriate) upon the curing of the completed portion of slurry. No adjustment of unit prices of any items shall be allowed due to a suspension of work as described above.

It is anticipated that nuisance water, such as storm water runoff and irrigation water, will run in and across the right-of-way at various time throughout the period of construction. It shall be the responsibility of the Contractor, at its own expense, to provide for and protect the work from such water.

In addition, the Contactor’s responsibility shall include handling nuisance waters such that their operations do not cause them to damage existing improvements or properties adjacent to or near the site of work.

The Contractor shall, at the direction of the Engineer, repair or reseal to the entire street, or complete section thereof, as determined by the Engineer, which have not been sealed properly (includes areas that have failed to meet yield and mix design specifications) and completely. No compensation will be provided for slurry seal used in repair and reseal work.

The start and finish of slurry application shall be a straight line which, unless otherwise approved by the Engineer, shall be obtained by laying a strip of building paper or other material approved by the Engineer on the pavement surface. After application of slurry, the paper is to be removed leaving a straight edge. The entire street surface area shall be sealed the same day.

The Contractor shall sweep any raveled material on the street one (1) week after the initial placement. If the Engineer determines the raveling is excessive, the frequency of sweeping shall be adjusted to the field conditions of the raveling. If raveling continues within two (2) weeks of the initial placement, the street shall be swept and re-slurry sealed at no cost to the City. Raveling can be identified by the presence of “black pebbles” in the gutter.

Payment: The contract unit price bid per square foot for the item “Slurry Seal, Type II” shall include full compensation for all labor, tools, equipment, loading, hauling, disposing of materials, import of material, compaction and incidentals for doing work involved. Adjustment of compensation will be made for any increase or decrease in the quantities at the stipulated unit price.

TP14. COLD MILLING ASPHALT CONCRETE SURFACING
For the areas of existing asphalt pavement to be removed by cold milling, the cold milling work shall be in accordance with section 404, "Cold Milling," of the Standard Specifications and these Special Provisions and to a minimum depth as stated on the plans.

Page 377 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
20 TECHNICAL PROVISIONS
Add to Subsection 404-2, "Milling Machine," of the Standard Specifications the following:

Asphalt fabric may be encountered during the milling and removal phase. The pavement fabric shall be removed and disposed as part of this bid item.

All cold milling shall conform to these Special Provisions. All temporary striping required after cold milling operations shall be installed per City Standards. All required temporary striping shall be considered paid for under other related bid items and no additional compensation will be allowed.

The Contractor shall be responsible for furnishing, placing and maintaining barricades and lights as necessary to protect the public from danger due to the work being done. The machine used for cold planing shall have performed satisfactorily on similar work and meet the following requirements:

The Planing Machine shall be specially designed and built to perform cold planing of bituminous pavement with the ability to plane concrete patches. The cutting drum shall be a minimum of sixty (60”) inches wide with carbide tip cutting placed in variable lacing patterns to provide various finishes. The machine shall be capable of operation at speeds ranging from 0 to 40 FPM. It shall be self-propelled and have a water spray at the cutting drum to minimize dust. The machine shall be capable of removing the material next to the gutter of the pavement being reconditioned and so designed and the operator thereof can at all times observe the planning operation without leaving the controls. The cutting drum shall be adjustable as to slope and shall deep cut in one pass a maximum of three (3”) inches without producing fumes or smoke.

Ski arms to improve smoothness of grinding operations are required with a minimum 30 foot long arm.

The Contractor shall provide a smaller machine to trim areas inaccessible to the larger machine at manholes, curb returns and intersections. The smaller machine shall be equipped with a twelve (12”) inch wide cutting drum mounted upon a three (3) wheel chassis allowing it to be positioned without interrupting traffic and pedestrian flow.

During the operation the Contractor shall sweep the street with mechanical equipment and remove all loose material from planed areas. In addition, all existing asphalt/slurry buildup on the concrete gutter shall be removed and the cost thereof shall be included in the unit price of cold plaining cost, no additional compensations shall be paid. The Contractor shall abate dust nuisance by cleaning, sweeping and sprinkling with water or other means as necessary.

Residue from grinding shall not be permitted to flow or travel into gutters, onto adjacent street surfaces or parkways. All residues shall be completely removed by a vacuum sweeper and properly disposed. Sweeping is to take place immediately after the grinding has been completed and as directed by the Engineer. No washing of any residue into gutters and/or drainage structures shall be allowed. The Contractor shall cover and protect all storm drain inlets prior to the start of cold milling operations.

Page 378 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
21 TECHNICAL PROVISIONS
All pavement transitions and temporary striping/markings shall be in place prior to the opening of a lane for traffic. Any pavement grade differential between adjacent lanes that will, with the permission of the Engineer, remain during non-working hours shall be indicated with the appropriate warning signage. Cold mix A.C. shall be placed and maintained at the interface between milled and non-milled areas to eliminate the hazard caused by sudden elevation differences, especially in pedestrian path of travel areas adjacent to wheelchair ramps, and shall be removed prior to placement of surface course pavement.

The Contractor shall provide access and detours at all times for pedestrian facilities when cold milling. The Contractor is to notify the Engineer at least two (2) working days prior to and immediately after the cold mill operations so that observations and measurements may be made of areas before the placement of permanent asphalt.

Existing pavement thicknesses, as measured by the City’s geotechnical investigation, have been provided on the plans and in these specifications for reference purposes only. It shall be the contractor’s
responsibility to verify the existing pavement thickness and to adjust field operations accordingly in order to properly construct the proposed improvements.

Section 401, “Removal” of the Standard Specifications is supplemented by the following:

Removals shall include the removal of all materials to the depths shown on the plans.

Sawcut, excavation, removals, haul away, and fill necessary for these bid items shall be included and no additional compensation will be made thereof. Existing surfaces to be joined shall be sawcut on a neat, straight line at the join location.

At least two full time flag persons shall be assigned to the milling machine for traffic control when working on streets that are open to traffic.

If the milling operations results in the further degradation of the payment, the Contractor shall not continue the milling progress until the Engineer can address the issue. If the contractor fails to stop, the contractor will be liable for the damaged milled pavement and replace the failed section at their expense.

Milling depth at critical edges shall be adjusted to maintain a 3/8” lip from the finished surface of the proposed AC overlay to the critical edge. i.e. the AC surface shall not be greater the 3/8” higher than the edge of gutter
Payment: The contract unit bid price paid per square foot for Cold Milling Asphalt Concrete Surfacing shall include full compensation for furnishing all labor, materials, tools, equipment, grinding, loading, hauling, recycling, providing recycling weight certification, reports, and incidentals, and for doing all work involved in cold milling asphalt concrete surfacing, and no additional compensation will be allowed therefor.

Page 379 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
22 TECHNICAL PROVISIONS
TP15. EDGE MILLING ASPHALT CONCRETE SURFACING
Edge milling shall be performed in accordance with “Cold Milling Asphalt Concrete Surfacing”.

Edge milling shall occur along all edges where overlay and ARAM will occur.

Milling depth at critical edges shall be adjusted to maintain a 3/8” lip from the finished surface of the proposed ac overlay to the critical edge. i.e. the ac surface shall not be greater the 3/8” higher than the edge of gutter.

Edge milling shall be six feet wide, and may taper from a zero-inch mill to the necessary depth discussed above.

Payment for conforming to the requirements of this section shall be included in the price paid for other items of work and shall include full compensation for all labor, materials, tools, equipment, grinding, loading, hauling, recycling, and incidentals, and for doing all work involved in edge milling asphalt concrete surfacing.

TP16. HOT MIX ASPHALT
HMA shall conform to Green Book section 203-6, “Asphalt Concrete”. HMA shall be install/ placed in accordance with Green Book section 302-5, “Asphalt Concrete Pavement.” Project Mix: C2-PG 64-10-R05
Existing pavement markers shall be removed flush with the existing pavement prior to constructing asphalt concrete pavement.

Where asphalt concrete pavement is designated to be constructed on existing aggregate base, the existing base shall be compacted and graded in accordance with Subsection 301-2.3, "Compacting," of the Standard Specifications.

The asphalt concrete pavement shall be spread with a self-propelled mechanical spreading and finishing machine.

The Contractor shall have sufficient workers and equipment necessary to accomplish proper placement and compaction of the asphalt concrete pavement to the satisfaction of the Engineer.

Ski arms to improve smoothness of paving operations are required on all paved streets with a 30 foot minimum length arm for paving.

TACK COAT:

Section 302-5.4 “Tack Coat” of the Standard Specifications are supplemented by the following:

A tack coat shall be applied uniformly upon the existing pavement planes and joints, gutters, inlets, manholes, etc. prior to placing the asphalt concrete. The tack coat shall be SS-1h emulsified asphalt per Section 203-3. The surface to be covered shall be free of water, foreign material, vegetation

Page 380 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
23 TECHNICAL PROVISIONS
or dust before application of the tack coat.

The area to which tack coat has been applied shall be closed to public traffic. Care shall be taken to avoid tracking tack material onto existing pavement surfaces beyond the limits of construction.

Existing striping and pavement markings which have been tacked with tack coat shall be repainted at the Contractor’s expense. Certain driveways which are heavily used during hours of construction as determined by the Engineer, shall remain open as long as possible, and tack shall be applied to areas along said driveways as soon as possible before the asphalt is placed, or the Contractor may provide some means of protecting the tack coat while traffic passes over it. The means of protection shall be utilized only after approval by the Engineer.

The Contractor shall clean existing concrete and asphalt surfaces of any tack coat tracked onto them, to the satisfaction of the Engineer.

A tack coat shall be applied between each course of paving regardless of when the previous course of asphalt was laid. The contractor shall not be allowed to omit the tack coat for any circumstance unless approved by the Engineer.

Payment: The contract unit bid price paid per ton for Hot Mix Asphalt shall include full compensation for all items of the work and all appurtenant work, including furnishing all materials, labor, equipment, tools and incidentals.

Full compensation for furnishing and applying emulsion (paint binder/ tack coat) shall be considered as included in the contract price paid for Hot Mix Asphalt.

TP17. TRAFFIC STRIPING AND PAVEMENT MARKINGS
All traffic stripes and markings shall be thermoplastic. Application of thermoplastic traffic stripes (lane lines, centerlines) and thermoplastic pavement markings (word and symbol markings, limit lines, crosswalk, etc.) shall conform to the provisions in Section 84, "Pavement Markings," of the latest State Standard Specifications and these Special Provisions.

The Contractor shall layout and “cat-track” the alignment of the proposed striping at 15-foot intervals and “spot” the proposed pavement markings as called for on the Plans or match the exisitng. Striping shall vary no more than 2 inches in 50 feet from the specified alignment. The Engineer may waive minor variations.

The Contractor shall not proceed with applying any thermoplastic pavement striping and markings until the Engineer has checked and approved the cat-tracking and spotting, and has authorized the Contractor to proceed.

All traffic striping shall be performed with a road liner type striping machine. Where the configuration or location of a traffic stripe is such that the use of a road liner type striping machine is unsuitable, thermoplastic may be applied by other methods and equipment approved by the Engineer. The Engineer shall determine if the road liner type striping machine is unsuitable for a particular use.

Page 381 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
24 TECHNICAL PROVISIONS
Except as otherwise noted on the Plans or as directed by the Engineer, all angle points shall be painted as a smooth, tangent curve with a radius and length as approved in the field.

Temporary tape or reflective markers utilized for the purposes of interim delineation for centerline, lane lines, and crosswalk lines shall be placed to the side of the final striping pattern in such a way so that it will not interfere with the first coat of paint. All temporary tape and reflective markers applied for the purpose of interim delineation shall be removed by the Contractor at no additional cost to the City upon completion of the first coat of striping and prior to the final striping.

Stencils used for pavement markings must conform to the latest Caltrans approved Stenciling Standards.

Newly applied or existing striping or markings which are damaged as a result of the construction, including wheel markings by public traffic and the construction equipment, shall be replaced in kind, and any associated removals shall be performed as outlined in these Technical Provisions at the sole expense of the Contractor and no separate compensation will be allowed therefore.

Existing traffic striping and pavement markings that do not conform to the approved Plans shall be removed by wet sandblasting. Other methods may be requested by the Contractor, but shall be submitted in writing to the Engineer for approval. Blackout of existing traffic striping or pavement markings, which do not conform to the approved Plan, shall not be allowed.

Payment for all thermoplastic traffic striping, pavement markings, legends and markings shall be included in the contract lump sum price paid for Traffic Striping And Pavement Markings. Said payment shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in reestablishing all traffic stripes and applying thermoplastic pavement markings including establishing alignment for stripes, layout work, sandblasting all conflicting markings (including existing paint and thermoplastic on existing adjacent PCC gutters and spandrels), removing all conflicting raised pavement markers, and performing all work, complete in place, as shown on the Plans, as specified in the Standard Specifications and these Technical Provisions and as approved by the Engineer, and no separate or additional compensation will be allowed therefor.

TP18. PAVEMENT MARKERS
Pavement markers shall conform to the provisions in Section 82, "Signs and Markers," of the State of California Standard Specifications and these Special Provisions.

Certificates of compliance shall be furnished for pavement markers as specified in "Prequalified and Tested Signing and Delineation Materials," elsewhere in these Special Provisions.

Reflective pavement markers shall comply with the specific intensity requirements for reflectance after abrading the lens surface in accordance with California Test 669 specified for pavement markers placed in pavement recesses in Section 81-3.02C, "Reflective Pavement Markers," of the State of California Standard Specifications.

Page 382 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
25 TECHNICAL PROVISIONS
Non-reflective pavement markers shall conform to the requirements of the Section 85-1.02B, “Non-Reflective Pavement Markers,” of the State of California Standard Specifications.

The bituminous adhesive used to install both reflective and non-reflective markers shall be a hot melt bituminous adhesive asphaltic material with homogeneously mixed mineral filler and shall conform to the requirements specified in Section 81-3.03B, “Hot Melt Bituminous Adhesive,” of the Standard Specifications. Epoxy adhesive shall comply with Section 81-3.03C, “Epoxy Adhesive” of the Standard Specifications.

Reflective pavement markers shall be installed to match existing or as approved by the Engineer.

The composition of the material shall be such that its properties shall not deteriorate when heated to and applied at temperatures up to 425°F, using either air or oil jacketed melters.

Reflective pavement markers shall be placed at locations as established by the applicable Caltrans striping detail to match the existing which includes, but is not limited to temporary painted line(s), new striping, or existing striping. There shall be one marker for each location. The Contractor shall perform all work necessary to establish satisfactory locations for markers.

The Contractor shall remove existing reflective pavement markers that do not conform to the plan.

Reflective pavement markers shall be of the prismatic reflector type (3M model white 290-W and yellow 291-2Y) as outlined in Subsection 81-3.02C, “Reflective Pavement Markers,” of the State of California Standard Specifications.

In accordance with Public Contract Code Section 3400, the City has made all necessary findings, and hereby declares that the 3M brand product shall exclusively be supplied for use on this project in order to match other reflective pavement marker equipment already in use throughout the City.

In addition, the 3M product is the only product that has been found to achieve sufficient retro reflectivity and durability performance. Therefore, no substitutions will be allowed.

Existing pavement markers (blue) designating location of the fire hydrants shall be replaced “in kind” and proposed pavement markers (blue) designating location of the fire hydrants shall be installed, where they previously existed, after the paving is completed.

Payment: The compensation of Pavement Markers shall be included in the price paid for other items of work involved and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, for doing all the work involved in removing and replacing in-kind raised pavement markers and the items specified herein and no additional compensation shall be allowed therefor.

TP19. ADJUST VALVE TO GRADE
For all existing water valve and gas valve covers and for utility vaults, the Contractor shall notify the owners to adjust their facilities to grade. The Contractor shall loosen all valve covers immediately after paving. The Contractor shall paint all water valve covers blue and all gas valve covers yellow.

Page 383 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
26 TECHNICAL PROVISIONS
Payment: Loosening valve covers after paving and painting the covers shall be included in the price paid for other items. No compensation is proposed for adjusting valves to grade.

TP20. ADJUST MANHOLE TO GRADE
Adjustment of storm drain/sewer manhole frames and covers to grade shall be in accordance with the plans and section 403 “Manhole Adjustment and Reconstruction” of the Standard Specifications and the agency or utility standards and policies that owns or has control of the manhole.

The contractor is responsible for obtaining timely written approval from other applicable agencies that have jurisdiction over other manholes found within the work area.

In areas where AC leveling course, and/or AC over milled pavement is constructed the Contractor shall adjust manhole frames and covers to grade when the finished surface of the newly constructed pavement is greater than one-half (1/2) inch higher than the existing manhole frame.

Raised manhole rings and covers shall have a Type II barricade with two flashing lights placed over each manhole until it is paved.

After the pavement has been completed, the necessary portions of the sub-grade, base, and pavement shall be neatly removed, the structure built-up, and the manhole frame set to be backfilled with PCC concrete and Type III-C3-PG 64-10 asphalt concrete. The asphalt concrete shall be placed and compacted in a workmanlike manner to conform to the appearance of the surrounding pavement. The asphalt concrete shall be placed within two (2) days after the manhole ring and cover has been adjusted to final grade, unless otherwise approved by the Engineer.

Payment: Full compensation for adjusting manholes to grade shall be made at the contract unit price paid per each and shall include full compensation for furnishing all labor, materials, tools, and equipment, and for doing all the work involved, complete in place, and no additional compensation will be allowed therefor. Adjustment of compensation will be made for any increase or decrease in the quantities of manholes at the stipulated unit price.

TP21. CONCRETE REMOVAL AND REPLACEMENT
For ramp locations identified are not complied with the required grade on the landing area (top or bottom of the ramp) and shall be removed, disposed of and replaced with PCC in accordance with applicable Americans with Disabilities Act (ADA) requirements. After concrete is removed, the affected area shall be graded and compacted before pouring the new concrete.

Payment: The contract unit price bid per square feet for the item “CONCRETE REMOVAL AND REPLACEMENT” shall include full compensation for all labor, tools, equipment, loading, hauling, disposing of materials, import of material, compaction, replacement of new PCC, and incidentals for doing work involved. Adjustment of compensation will be made for any increase or decrease in the quantities at the stipulated unit price.

Page 384 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
27 TECHNICAL PROVISIONS
TP22. MINOR CONCRETE (RAMPS)
Concrete Curb Ramps shall be per SPPWC Standard Plan 111and County of Riverside Standard Plans, case and type per plans. Concrete shall be Class 520-C-2500.

The geometry shown on the plans is representational. The final limits and geometry of the required curb ramp shall be verified and placed in the field by the contractor in order to ensure the required grades and clearances are obtained.

Curb and Gutter Shall be included in the limits of the Curb Ramp which includes the sawcutting and full AC reconstruction of a 3’ wide (slot pavement with 2-sack PCC slurry) portion of AC pavement adjacent to the curb and gutter in order to achieve the required 5% maximum grade for 4’ adjacent to the curb face. A minimum of a 3’ saw cut and pavement replacement will be required in all areas of curb return replacements adjacent to existing pavement not slated for grind and overlay. In locations for a 3’ slot pave with 2-sack PCC slurry is inadequate at achieving the required 5% maximum grade and would create adverse driving conditions for the 1’ transition, each location shall be individually documented in the construction project files justifying the reason for non-compliance. The proposed pavement section shall be full depth asphalt paving to match the existing pavement section thickness.

Construction of any necessary retaining curbs at the back of ramp or wings of the ramp are included as part of this bid item. The contractor shall install retaining curbs within the ramps to ensure that the constructed ramp is fully ADA compliant while joining existing grades at the back of walk/ramp.

When curb ramp removal and installation is adjacent to PCC cross gutters that are not abandoned/buried then the concrete shall be sawcut 4” off the existing curb face, and the new concrete shall be doweled and epoxied into the existing cross gutter spandrel at 12” on center using 18” #4 bars.

All work within the 1’ rumble strip at grade breaks of the sidewalk shall be considered as part of the curb ramp. All work past the 1’ rumble strip, which has been approved by the engineer, shall be considered as extra sidewalk or curb and gutter items and will be paid for per the respective unit price.

Existing surfaces to be joined shall be sawcut on a neat, straight line at the join location. All sawcut locations along existing cross gutters shall be cut in a curve conforming to the existing curb return and shall be cut at a set offset from the flow line as approved by the City Engineer. The flow line shall be maintained, ensuring that ponding does not occur in the existing cross gutter.

Any and all Traffic Signals, or pedestrian push button poles, traffic signal poles and other surface mounted appurtenances shall be protected in place and/or re-attached as part of this bid item.

All pull boxes within curb ramp limits shall also be adjusted to the finished grade of the new curb ramp and shall be paid for per the unit price for each respective bid item.

Page 385 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
28 TECHNICAL PROVISIONS
All water or gas valve can and lids within curb ramp limits shall also be adjusted to the finished grade of the new curb ramp and shall be paid for per the unit price for each respective bid item.

The City Engineer shall have final say regarding the case and type of curb ramp to be installed and shall retain the right to revise the ramp designation at any point prior to construction.

The contractor shall verify existing grades in order to ensure full ADA compliance Curb ramps shall be constructed with detectable warning surfacing complying with California Building Code Title 24. Detectable warning surfacing shall consist of vitrified polymer composite, with at least 25% by weight aluminum oxide, nominally 0.20" thick, colorfast and UV stable.

Panels must be embedded in new ramps. Embedded panels shall have perforated embedment ribs at 3" on center, at least 1” deep.

Other physical characteristics shall be as follows:

Compressive Strength Greater than 18,000 psi ASTM D 695 Flexural Strength Greater than 24,000 psi ASTM D 790
Tensile Strength Greater than 10,000 psi ASTM D 638
131
Water Absorption Less than 0.35% ASTM D 570
Slip Resistance Greater than 0.80 ASTM C 1028
Flame Spread Index Less than 25 ASTM E 84
Salt Spray No Change (200 hours) ASTM B 117
Chemical Stain Testing No Deterioration ASTM 1308
Abrasion Resistance Less than 0.030 (1,000 cycles) ASTM D 2386 Accelerated Weathering No Damage (2,000 hours) ASTM G 29 Load Bearing at 16,000 lbs. No Damage AASHTO-H20
Freeze / Thaw / Heat No Disintegration ASTM C 1026
The color of the panels shall be yellow complying with the Federal Standard 595B, color No. 33538. truncated domes. The Contractor shall install panels in accordance with manufacturer's recommendations. The cost of installing detectable warning service panels on new ramps shall be included in the cost of the curb ramp.

All landscaping, irrigation lines, if any, and related work to return the area to its original condition.

Retrofitting detectable warning surfaces on existing ramp or walkway surfaces shall be paid for as part of their respective bid items.

Payment: The contract unit price bid per each for the item “MINOR CONCRETE (RAMPS)” shall include full compensation for all labor, tools, equipment, loading, hauling, disposing of materials, import of material, compaction and incidentals for doing work involved.

Page 386 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
29 TECHNICAL PROVISIONS
TP23. CURB RAMP DETECTABLE WARNING SURFACE
This work includes installing detectable warning surfaces on the curb ramps or as necessary to bring the ramp into compliance.

Curb ramps shall be constructed with detectable warning surfacing complying with California Building Code Title 24. Detectable warning surfacing shall consist of vitrified polymer composite, with at least 25% by weight aluminum oxide, nominally 0.20" thick, colorfast and UV stable.

Panels must be embedded in new ramps. Embedded panels shall have perforated embedment ribs at 3" on center, at least 1” deep.

Other physical characteristics shall be as follows:

Compressive Strength Greater than 18,000 psi ASTM D 695 Flexural Strength Greater than 24,000 psi ASTM D 790
Tensile Strength Greater than 10,000 psi ASTM D 638
131
Water Absorption Less than 0.35% ASTM D 570
Slip Resistance Greater than 0.80 ASTM C 1028
Flame Spread Index Less than 25 ASTM E 84
Salt Spray No Change (200 hours) ASTM B 117
Chemical Stain Testing No Deterioration ASTM 1308
Abrasion Resistance Less than 0.030 (1,000 cycles) ASTM D 2386 Accelerated Weathering No Damage (2,000 hours) ASTM G 29 Load Bearing at 16,000 lbs. No Damage AASHTO-H20
Freeze / Thaw / Heat No Disintegration ASTM C 1026
The color of the panels shall be yellow complying with the Federal Standard 595B, color No. 33538. truncated domes. The Contractor shall install panels in accordance with manufacturer's recommendations. The cost of installing detectable warning service panels on new ramps shall be included in the cost of the curb ramp.

The manufacturer must provide a written 5-year warranty for detectable warning surface, guaranteeing replacement when there is a defect in the dome shape, color fastness sound-on-cane acoustic quality, resilience, or attachment. The warranty period shall begin upon acceptance of the contract.

Payment: “CURB RAMP DETECTABLE WARNING SURFACE” for new ramps shall be considered as included with the contract unit price paid for the MINOR CONCRETE (RAMPS).

For existing ramps the contract unit bid price per each for the item “CURB RAMP ETECTABLE WARNING SURFACE” shall include full compensation for all labor, tools, equipment, loading, hauling, disposing of materials, import of material, compaction and incidentals for doing work involved. Adjustment of compensation will be made for any increase or decrease in the quantities at the stipulated unit price.

Page 387 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
30 TECHNICAL PROVISIONS
TP24. GUARANTEE
In addition to guarantees required elsewhere, the contractor shall and hereby does guarantee all Work for a period of one (1) year after the date of acceptance of the Work by the City and shall repair and replace any and all such Work, together with any other work which may be displaced in so doing that may prove defective in workmanship and/or materials within the one (1) year period from the date of acceptance, without expense whatsoever to the City, ordinary wear and tear and usual abuse or neglect excepted. In the event of failure to comply with the above mentioned conditions within five (5) days after being notified in writing, the City is hereby authorized to proceed to have the defects repaired and made good at the expense of the Contractor, who shall pay the cost and charges therefore immediately upon demand.

Page 388 of 669 ends

City of Beaumont Citywide Street Rehabilitation Project 23/24 Technical Specifications
31 TECHNICAL PROVISIONS

APPENDIX A-CONSTRUCTION PLANS

Page 389 of 669 ends
Page 1 of 13 ends

CITY OF BEAUMONT

PUBLIC WORKS AGREEMENT

This PUBLIC WORKS AGREEMENT (“Agreement”) is made and effective ______, 2023 by and between the City of Beaumont, a municipal corporation (“CITY”), and ___________________________________ (“CONTRACTOR”). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows:

I. SCOPE OF WORK

The CONTRACTOR shall perform within the time set forth in Article 2 of this Agreement and shall furnish all labor, materials, equipment, tools, utility services, and transportation and perform and complete all work required in connection with the ___________________ (hereinafter “Project”). CITY’s Invitation for Bids (“Invitation”) for the Project, dated _______ 2023, and CONTRACTOR’s Bid in response to the Invitation, dated ________, 2023, are attached hereto as Exhibits A and B, respectively and incorporated herein by this reference. The Scope of Work for the Project is set forth in the Invitation. In the event that any terms of the Bid are different from the Invitation for Bids, the Invitation for Bids shall control.

Any additional terms in the Bid that purport to bind the City to any additional terms not contained in this Agreement and related attachments shall not be binding on the City.

By entering into this Agreement, CONTRACTOR acknowledges that there may be other contractors on the site whose work will be coordinated with that of its own.

CONTRACTOR expressly warrants and agrees that it will cooperate with other contractors and will do nothing to delay, hinder, or interfere with the work of o ther separate contractors, the CITY, the Construction Manager, the Engineer, or utilities. CONTRACTOR also expressly agrees that, in the event its work is hindered, delayed, interfered with, or otherwise affected by a separate contractor, its sole remedy will be a direct action against the separate contractor. To the extent allowed by law, the CONTRACTOR will have no remedy, and hereby expressly waives any remedy against the CITY, the Construction Manager (if any), and the Engineer on account of delay, hindrance, interference or other events.

II. TIME FOR PROJECT COMPLETION

All of CONTRACTOR’s work on the Project shall be completed within durations established for the individual activities. All work shall commence ten (10) calendar days after receiving a written Notice of Award from the CITY or Construction Manager, if a Construction Manager is employed by CITY on the Project.

CONTRACTOR shall refer to the invitations for bids, and Project Plans and Specifications, all of which, as set forth below, are incorporated herein by reference, for contractual obligations regarding individual activity durations.

Page 390 of 669 ends
Page 2 of 13 ends

III. THE CONTRACT SUM

The CITY shall pay to the CONTRACTOR for the performance of this Agreement, subject to any additions and deductions provided in the Project documents, the sum of ____________ dollars ($_______).

IV. PROGRESS PAYMENTS

Based upon Applications for Payment submitted to the Engineer by the CONTRACTOR and Certificates for Payment issued by the Engineer, the CITY shall make progress payments on account of the Contract Sum to the CONTRACTOR as provided in the General Conditions, which are fully incorporated into this Agreement by this reference.

This Agreement is subject to the provisions of Article 1.7 (commencing at Section 20104.50) of Division 2, Part 3 of the Public Contract Code regarding prompt payment of contractors by local governments. Article 1.7 mandates certain procedures for the payment of undisputed and properly submitted payment requests within 30 days after receipt, for the review of payment requests, for notice to Contractor of improper payment requests, and provides for the payment of interest on progress payment requests which are not timely made in accordance with that Article. This Agreement hereby incorporates the provisions of Article 1.7 as though fully set forth herein.

V. INDEMNITY, DEFENSE AND HOLD HARMLESS AGREEMENT

CONTRACTOR shall indemnify, defend with legal counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with C ONTRACTOR’s negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the CITY. Should conflict of interest principles preclude a single legal counsel from representing both CITY and CONTRACTOR, or should CITY otherwise find CONTRACTOR’s legal counsel unacceptable, then CONTRACTOR shall reimburse the CITY its costs of defense, including without limitation reasonable legal counsels fees, expert fees and all other costs and fees of litigation. The CONTRACTOR shall promptly pay any final judgment rendered against the CITY (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the CONTRACTOR’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

Page 391 of 669 ends
Page 3 of 13 ends

CONTRACTOR obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of CITY under any provision of this agreement, CONTRACTOR shall not be required to indemnify and hold harmless CITY for liability attributable to the active negligence of CITY, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisd iction. In instances where CITY is shown to have been actively negligent and where CITY active negligence accounts for only a percentage of the liability involved, the obligation of CONTRACTOR will be for that entire portion or percentage of liability not attributable to the active negligence of CITY.

VI. PREVAILING WAGES

A. Contractor shall comply with all applicable laws and regulations relating to prevailing wages. Wage rates for this Project shall be in accordance with the “General Wage Determination Made By the Director of Industrial Relations Pursuant To California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770, 1773 and 1773.1”, for Riverside County. Wage rates shall conform with those posted at Beaumont City Hall and the Project site.

B. The following Labor Code sections are hereby referenced and made a part of this Agreement:

1. Section 1775 - Penalty for Failure to Comply with Prevailing Wage Rates.

2. Section 1777.4 - Apprenticeship Requirements.

3. Section 1777.5 - Apprenticeship Requirements.

4. Section 1813 - Penalty for Failure to Pay Overtime.

5. Sections 1810 and 1811 - Working Hour Restrictions.

6. Section 1775 - Payroll Records.

7. Section 1773.8 - Travel and Subsistence Pay.

VII. RECORD AUDIT

In accordance with Government Code, Section 8546.7, records of both the CITY and the CONTRACTOR shall be subject to examination and audit by the Auditor General for a period of three (3) years after final payment.

VIII. FINAL PAYMENT

Final payment, constituting the entire unpaid balance of the Agreement Sum, shall be paid by the CITY to the CONTRACTOR no sooner than thirty-five (35) days after a Notice of Completion has been recorded, unless otherwise stipulated in the

Page 392 of 669 ends
Page 4 of 13 ends

Notice of Completion, provided the work has then been completed, the Agreement fully performed, and a final Certificate for Payment has been issued by the Engineer.

IX. CONTRACTOR’S FAILURE TO PROCURE COMPLETION OF PROJECT

In the event CONTRACTOR fails to furnish tools, equipment, or labor in the necessary quantity or quality, or fails to prosecute the work or any part thereof contemplated by this Agreement in a diligent and workmanlike manner, and if the CONTRACTOR for a period of three (3) calendar days after receipt of written demand from CITY or its designated representative to do so, fails to furnish tools, equipment, or labor in the necessary quantity or quality, and to prosecute its work and all parts thereof in a diligent and workmanlike manner, or after commencing to do so within said three (3) calendar days, fails to continue to do so; then the CITY may exclude the CONTRACTOR from the premises, or any portion thereof, and take possession of said premises or any portion thereof, together with all material and equipment thereon, and may complete the work contemplated by this Agreement or any portion of said work, either by furnishing the tools, equipment, labor or material necessary, or by letting the unfinished portion of said work, or the portion taken over by the CITY to another contractor or by a combination of such methods. In any event, the procuring of the completion of said work, or the portion thereof taken over by the CITY, shall be a charge against the CONTRACTOR, and may be deducted from any money due or becoming due to CONTRACTOR from the CITY, or the CONTRACTOR shall pay the CITY the amount of said charge, or the portion thereof unsatisfied. The sureties, provided for under this Agreement shall become liable for payment should CONTRACTOR fail to pay in full any said cost incurred by the CITY.

X. INSURANCE

Prior to the beginning of and throughout the duration of the Project, CONTRACTOR and its subcontractors shall maintain insurance in conformance with the requirements set forth below. Attached hereto as Exhibit C are copies of Certificates of Insurance and the waiver of subrogation endorsement as required by Section 6.B.1. CONTRACTOR will use existing coverage to comply with these requirements. If that existing coverage does not meet the requirements set forth herein, CONTRACTOR agrees to amend, supplement or endorse the existing coverage to do so.

CONTRACTOR acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to CONTRACTOR or its subcontractors in excess of the limits and coverage identified in this Agreement and which is applicable to a given loss, claim or demand, will be equally available to CITY.

A. Types of Insurance

Page 393 of 669 ends
Page 5 of 13 ends

Without limiting CONTRACTOR’s indemnification of CITY, and prior to commencement of Work, CONTRACTOR shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to CITY:

1. General liability insurance. CONTRACTOR shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.

2. Automobile liability insurance. CONTRACTOR shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the CONTRACTOR arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.

3. Umbrella or excess liability insurance. If CONTRACTOR is using umbrella coverage to meet part of its liability insurance requirements under Paragraph 1 of this Section, CONTRACTOR shall obtain and maintain an umbrella or excess liability insurance that will provide bodily injury, personal injury, completed operations and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability and employer’s liability.

Such policy or policies shall include the following terms and conditions:

 A drop down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason;  Pay on behalf of wording as opposed to reimbursement;  Concurrency of effective dates with primary policies;  Policies shall “follow form” to the underlying primary policies; and  Insureds under primary policies shall also be insureds under the umbrella or excess policies.

4. Workers’ compensation insurance. CONTRACTOR shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for CONTRACTOR’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition,

Page 394 of 669 ends
Page 6 of 13 ends

CONTRACTOR shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees.

CONTRACTOR shall submit to CITY, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of CITY, its officers, agents, employees and volunteers.

5. Pollution liability insurance. Environmental Impairment Liability Insurance shall be written on a CONTRACTOR’s Pollution Liability form or other form acceptable to CITY providing coverage for liability arising out of sudden, accidental and gradual pollution and remediation. The policy limit shall be no less than $1,000,000 dollars per claim and in the aggregate. All activities contemplated in this Agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for the hauling of waste from the project site to the final disposal location, including non-owned disposal sites.

Products/completed operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent con tractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The CITY, its officials, officers, agents, and employees, shall be included as insureds under the policy.

6. Builder’s risk insurance. Upon commencement of construction and with approval of CITY, CONTRACTOR shall obtain and maintain builder’s risk insurance for the entire duration of the Project until only the CITY has an insurable interest. The Builder’s Risk coverage shall include the coverages as specified below.

The named insureds shall be CONTRACTOR and CITY, including its officers, officials, employees, and agents. All Subcontractors (excluding those solely responsible for design Work) of any tier and suppliers shall be included as additional insureds as their interests may appear.

CONTRACTOR shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to CITY.

The policy shall contain a provision that all proceeds from the builder’s risk policy shall be made payable to the CITY. The CITY will act as a fiduciary for all other interests in the Project.

Page 395 of 669 ends
Page 7 of 13 ends

Policy shall be provided for replacement value on an “all risk” basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, Nonconforming Work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site or any staging area. Such insurance shall be on a form acceptable to CITY to ensure adequacy of terms and sublimits and shall be submitted to the CITY prior to commencement of construction.

B. Other provisions or requirements

1. Proof of insurance. CONTRACTOR shall provide certificates of insurance to CITY as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers ’ compensation. Insurance certificates and endorsements must be approved by CITY’s risk manager prior to commencement of performance. Current certification of insurance shall be kept on file with CITY at all times during the term of this contract. CITY reserves the right to require complete, certified copies of all required insurance policies, at any time.

2. Duration of coverage. CONTRACTOR shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by CONTRACTOR, his agents, representatives, employees or subcontractors. CONTRACTOR must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. CITY and its officers, officials, employees, and agents shall continue as additional insureds under such policies.

3. Primary/noncontributing. Coverage provided by CONTRACTOR shall be primary and any insurance or self-insurance procured or maintained by CITY shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and

Page 396 of 669 ends
Page 8 of 13 ends

umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non -contributory basis for the benefit of CITY before the CITY’s own insurance or self-insurance shall be called upon to protect it as a named insured.

4. CITY’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these requirements or is canceled and not replaced, CITY has the right but not the duty to obtain the insurance it deems necessary and any premium paid by CITY will be promptly reimbursed by CONTRACTOR or CITY will withhold amounts sufficient to pay premium from CONTRACTOR payments. In the alternative, CITY may cancel this Agreement.

5. Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the CITY’s risk manager.

6. Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow C ONTRACTOR or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss.

CONTRACTOR hereby waives its own right of recovery against CITY, and shall require similar written express waivers and insuran ce clauses from each of its subconsultants.

7. Enforcement of contract provisions (non estoppel). CONTRACTOR acknowledges and agrees that any actual or alleged failure on the part of the CITY to inform CONTRACTOR of non-compliance with any requirement imposes no additional obligations on the CITY nor does it waive any rights hereunder.

8. Requirements not limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type.

Page 397 of 669 ends
Page 9 of 13 ends

If the CONTRACTOR maintains higher limits than the minimums shown above, the CITY requires and shall be entitled to coverage for the higher limits maintained by the CONTRACTOR. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the CITY.

9. Notice of cancellation. CONTRACTOR agrees to oblige its insurance agent or broker and insurers to provide to CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.

10. Additional insured status. General liability policies shall provide or be endorsed to provide that CITY and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies.

This provision shall also apply to any excess/umbrella liability policies.

11. Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to CITY and approved of in writing.

12. Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that CONTRACTOR’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.

13. Pass through clause. CONTRACTOR agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by CONTRACTOR, provide the same minimum insurance coverage and endorsements required of CONTRACTOR. CONTRACTOR agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. CONTRACTOR agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to CITY for review.

14. CITY’s right to revise requirements. The CITY reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the CONTRACTOR a ninety (90) day advance written notice of such change. If such change results in substantial additional cost to the CONTRACTOR, the CITY and CONTRACTOR may renegotiate CONTRACTOR’s compensation.

Page 398 of 669 ends
Page 10 of 13 ends

15. Self-insured retentions. Any self-insured retentions must be declared to and approved by CITY. CITY reserves the right to require that self- insured retentions be eliminated, lowered, or replaced by a deductible.

Self-insurance will not be considered to comply with these specifications unless approved by CITY.

16. Timely notice of claims. CONTRACTOR shall give CITY prompt and timely notice of claims made or suits instituted that arise out of or result from CONTRACTOR’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.

17. Additional insurance. CONTRACTOR shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.

XI. CONTRACTOR’S LICENSE

CONTRACTOR must possess at the time of commencing work and throughout the Project duration, a Contractor’s License, issued by the State of California, which is current and in good standing. CONTRACTOR shall ensure that any subcontractor working on the Project possesses at the time of commencing work and throughout the Project duration, a Contractor’s License, issued by the State of California, which is current and in good standing.

XII. REGISTRATION REQUIREMENTS

A. Pursuant to Section 1771.1(a) of the Labor Code:

“A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuan t to Section 1725.5 at the time the contract is awarded.”

B. CONTRACTOR must be registered with the Department of Industrial Relations (DIR) of the State of California in order to be eligible to work on public works projects. CONTRACTOR must ensure registration with the DIR that is active and in good standing.

Page 399 of 669 ends
Page 11 of 13 ends

C. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

C. The CONTRACTOR is not subject to public works requirements (including registration with the DIR) if the public works project is under $1,000, unless the CITY knows that the same CONTRACTOR will be awarded total project costs in excess of $1,000 for a given year.

]XIII. CORPORATION IN GOOD STANDING

If CONTRACTOR is a corporation, the undersigned hereby represents and warrants that the corporation is duly incorporated and in good standing in the State of California, and that _______ whose title is President is authorized to act for and bind the corporation.

XIV. PROVISIONS REQUIRED BY LAW

Each and every provision of law and clause required by law to be inserted in this Agreement shall be deemed to be inserted herein and the Agreement shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not currently inserted, then upon application of either party the Agreement shall forthwith be physically amended to make such insertion or correction.

XV. SUBSURFACE HAZARDOUS MATERIALS

A. In the event trenches or other excavations extend deeper than four (4) feet below the surface, the CONTRACTOR shall promptly, and before the following conditions are disturbed, notify the CITY in writing of any:

1. Material that the CONTRACTOR believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code that is required to be removed to a Class I, Class II or Class III disposal site in accordance with the provisions of existing law.

Page 400 of 669 ends
Page 12 of 13 ends

2. Subsurface or latent physical conditions at the site differing from those indicated.

3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in the Work or the character provided for in the CONTRACT.

B. Upon receipt of said notification the CITY will investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the CONTRACTOR’s cost of or the time required for performance of any part of the work, the CITY will issue a change order under the procedures described in the General Conditions.

C. In the event that a dispute arises between the CITY and the CONTRACTOR whether the conditions materially differ, or involve hazardous waste or cause a decrease or increase in the CONTRACTOR’s cost of or time required for performance of any part of the work, the CONTRACTOR shall not be excused from any scheduled completion date provided for by the Agreement, but shall proceed with all work to be performed under the Agreement. The CONTRACTOR shall retain any and all rights provided either by Agreement or by law which pertain to the resolution of disputes and protests between the contracting parties.

XVI. COMPONENT PARTS OF THE CONTRACT

This Agreement entered into consists of the following CONTRACT DOCUMENTS, all of which are component parts of the Agreement as if herein set out in full or attached hereto:

Notice Inviting Bids
Scope of Work Summary
Information for Bidders
Bid Form
Non-Collusion Affidavit
Site Visit Certification
Faithful Performance Bond
Labor and Materials Payment
Bond
General and Supplemental
Conditions
Special Conditions
Project Construction Schedule
Proposed Subcontractors
Bid Bond
Information Required of Bidder
Construction Services Agreement
Certificate Regarding Worker’s
Compensation
Drug-free Workplace Certification
Plans and Specifications
Addenda
Drawings
Change Orders
Shop Drawing Transmittals
Contractor’s Certificate Regarding
Non-Asbestos Containing
Materials

Page 401 of 669 ends

13 All of the above named CONTRACT DOCUMENTS are intended to be complementary. Work required by one of the above named CONTRACT DOCUMENTS and not by others shall be done as if required by all.

XVII. ENTIRE CONTRACT

This Agreement constitutes the entire contract of the parties. No other agreements or contracts, whether oral or written, pertaining to the work to be performed, exists between the parties. This Agreement can be modified only by an amendment in writing, signed by both parties.

[Signatures on following page.]

Page 402 of 669 ends

14 SIGNATURE PAGE TO

CITY OF BEAUMONT

PUBLIC WORKS AGREEMENT

CITY:

CITY OF BEAUMONT

By:
________________________________
Mayor
CONTRACTOR:

_____________________________

By: ______________________________

Print Name: _______________________

Title:
_____________________________

Page 403 of 669 ends

15 CITY OF BEAUMONT

PUBLIC WORKS AGREEMENT

EXHIBIT “A”

CITY’S INVITATION FOR BIDS

(Insert behind this page.)

Page 404 of 669 ends

16 CITY OF BEAUMONT

PUBLIC WORKS AGREEMENT

EXHIBIT “B”

CONTRACTOR’S Bid

(Insert behind this page.)

Page 405 of 669 ends

17 CITY OF BEAUMONT

PUBLIC WORKS AGREEMENT

EXHIBIT “C”

Insurance Certificates and Endorsements

(Insert behind this page.)

Page 406 of 669 ends

Staff Report

TO: City Council
FROM: Robert Vestal, Interim Public Works Director
DATE September 5, 2023
SUBJECT: Baseline Agreement for Potrero Boulevard Interchange Phase II Project

Description Baseline Agreement (Agreement) for the State Route 60 (SR-60)/Potrero Boulevard Interchange Phase II Project(Project) between California Transportation Commission (CTC), the California Department of Transportation (Caltrans), and the City of Beaumont.

Background and Analysis:

In 2010, the City began working with Caltrans to construct a new modified partial cloverleaf interchange on SR-60 with a new bridge overcrossing at Potrero Boulevard.

Due to lack of funding, the City decided to develop the project as a two-phase improvement while keeping environmental and right of way components complete for the whole Project. Phase I, which completed construction in 2020, include d the widening of Potrero Boulevard and construction of the overcrossing structure. Phase II, the subject of the Agreement, includes constructing the eastbound and westbound off - ramps and loop on-ramps to provide access to SR-60, realigning Western Knolls Avenue that fronts the freeway, and installing landscape features to complete the interchange.

In June 2016, in partnership with Caltrans, the Project received environmental clearances for its compliance under the California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA). Subsequently, the City acquired all parcels needed for the entire Project and cleared utility conflicts which lead to obtaining right of way certification in June 2017. With funding contributions from the City, Riverside County Transportation Commission (RCTC), and previously committed federal funds, Phase I construction began in 2018 and was completed in 2020.

On November 18, 2022, the City applied for 2022 Trade Corridor Enhancement Program (TCEP) grant. The purpose of the Trade Corridor Enhancement Program is to provide funding for infrastructure improvements on federally designated Trade Corridors of National and Regional Significance, on California's portion of the National Highway

Page 407 of 669 ends

Freight Network, as identified in California Freight Mobility Plan, and along other corridors that have a high volume of freight movement.

On June 29, 2023, the CTC adopted the 2022 TCEP Program of Projects, Resolution G-22-46, which includes $33,500,000 in TCEP funding for the Project.

TCEP is a reimbursement program for eligible costs incurred. An agency may begin incurring eligible costs upon allocation. However, reimbursement is dependent upon entering into an agreement with Caltrans. Therefore, staff is recommending that City Council approve the baseline agreement.

Future City Council Items associated with the Project:

 2nd Amendment to Mark Thomas Professional Service Agreement to update plans to latest Caltrans Standards
 Funding Agreement Between RCTC and City for $8,000,000 TUMF Reginal Arterial Funds
 Pre-bid Project Plans, Specifications, and Estimate Approval  Construction Award

Tentative Project Schedule:

 CTC Baseline Agreement Approval 12/7/2023
 Caltrans Right-of-Way Certification 1/2024
 CEQA/NEPA Revalidation 3/2024
 Final PS&E 5/2024
 Begin Construction 11/2024
 Construction Completion 11/2026
Fiscal Impact:

The cost to prepare this staff report is estimated to be $1,000. There is no cost associated with the approval of the Agreement. The following is an account summary for the Project with TCEP and TUMF RA funds included:

2016-003 Potrero Phase 2 Project Accounting Summary
Funding Summary
Funding Year Funding Source Amount
21/22 Pass Zone TIP (Construction) $1,500,000.00
22/23 Pass Zone TIP (Construction) $1,500,000.00

Page 408 of 669 ends

23/24 Pass Zone TIP (Construction) $3,250,000.00
21/22 Pass Zone TIP (PSE) $250,000.00
23/24 TCEP (State) $7,500,000.00
23/24 TCEP NHFP (Federal) $26,000,000.00
23/24 RCTC TUMF RA $8,000,000.00
23/24 General Fund $1,000,000.00
Total Project Funding = $49,000,000.00
Budget Summary
Project Component Budget Encumbered Paid to Date Remaining Budget
Project Management $0.00 $0.00 $0.00 $0.00
Preliminary Services $0.00 ($4,980.00) ($2,922.50) $0.00 Environmental $0.00 $0.00 $0.00 $0.00
Design $400,000.00 ($112,344.00) ($109,836.42) $287,656.00 Construction $48,600,000.00 $0.00 $0.00 $48,600,000.00 Construction Management $0.00 $0.00 $0.00 $0.00
Permits $0.00 $0.00 $0.00 $0.00
Equipment $0.00 $0.00 $0.00 $0.00
Project Summary Totals $49,000,000.00 ($117,324.00) ($112,758.92) $48,887,656.00

Recommended Action:

Approve Baseline Agreement for the State Route 60 (SR-60)/Potrero Boulevard Interchange Phase II Project between California Transportation Commission, the California Department of Transportation, and the City of Beaumont.

Attachments:

A. Baseline Agreement with Exhibits
B. 2022 TCEP Program of Projects

Page 409 of 669 ends

Project Baseline Agreement Page 1 of 3

STATE OF CALIFORNIA - CALIFORNIA TRANSPORTATION COMMISSION CTC-0001 (REV. 03/2023)
ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017

PROJECT BASELINE AGREEMENT

1.FUNDING PROGRAM
Resolution
Active Transportation Program
Local Partnership Program (Competitive)
Solutions for Congested Corridors Program
State Highway Operation and Protection Program
Trade Corridor Enhancement Program

2.PARTIES AND DATE

2.1 This Project Baseline Agreement (Agreement) effective on (will be completed by CTC), is made by and between the California Transportation Commission (Commission), the California Department of Transportation (Caltrans), the Project Applicant, ,and the Implementing Agency, , sometimes collectively referred to as the “Parties”.

3.RECITAL

3.1 Whereas at its meeting the Commission approved the and included in this program of projects the , the parties are entering into this Project Baseline Agreement to document the project cost, schedule, scope and benefits, as detailed on the Project Programming Request Form attached hereto as Exhibit A, the Project Report attached hereto as Exhibit B, the Performance Metrics Form, if applicable, attached hereto as Exhibit C, as the baseline for project monitoring by the Commission.

3.2 The undersigned Project Applicant certifies that the funding sources cited are committed and expected to be available; the estimated costs represent full project funding; and the scope and description of benefits is the best estimate possible.

4.GENERAL PROVISIONS
The Project Applicant, Implementing Agency, and Caltrans agree to abide by the following provisions:

4.1 To meet the requirements of the Road Repair and Accountability Act of 2017 (Senate Bill [SB] 1, Chapter 5, Statutes of 2017) which provides the first significant, stable, and on-going increase in state transportation funding in more than two decades.

4.2 To adhere, as applicable, to the provisions of the Commission:

Resolution , “Adoption of Program of Projects for the Active Transportation Program”, dated Resolution , “Adoption of Program of Projects for the Local Partnership Program”, dated Resolution , “Adoption of Program of Projects for the Solutions for Congested Corridors Program”, dated
Resolution , “Adoption of Program of Projects for the State Highway Operation and Protection Program”, dated
Resolution , “Adoption of Program of Projects for the Trade Corridor Enhancement Program”, dated

(to be completed by CTC)
The State Route 60 (SR-60)/Potrero Boulevard Interchange Phase II Project The State Route 60 (SR-60)/Potrero Boulevard Interchange Phase II Project City of Beaumont City of Beaumont
6/29/2023
G-22-46
6/29/2022
4 Trade Corridor Enhancement Program

Page 410 of 669 ends
Page 2 of 3 ends

4.3 All signatories agree to adhere to the Commission's Guidelines. Any conflict between the programs will be resolved at the discretion of the Commission.

4.4 All signatories agree to adhere to the Commission's SB 1 Accountability and Transparency Guidelines and policies, and program and project amendment processes.

4.5 4.6
agrees to secure funds for any additional costs of the project. agrees to report to Caltrans on a quarterly basis; on the progress made toward the implementation of the project, including scope, cost, schedule, and anticipated benefits/performance metric outcomes.

4.7 Caltrans agrees to prepare program progress reports on a on a semi-annual basis and include information appropriate to assess the current

4.8 state of the overall program and the current status of each project identified in the program report. agrees to submit a timely Completion Report and Final Delivery Report as specified in the Commission’s SB 1 Accountability and Transparency Guidelines.
documents, including without limitation engineering, financial and other data, and methodologies and assumptions used in the determination of project benefits and performance metric outcomes during the course of the project, and retain those records for six years from the date of the final closeout of the project. Financial records will be maintained in accordance with Generally Accepted Accounting Principles.

4.11 The Inspector General of the Independent Office of Audits and Investigations has the right to audit the project records, including technical and financial data, of the Department of Transportation, the Project Applicant, the Implementing Agency, and any consultant or sub-consultants at any time during the course of the project and for six years from the date of the final closeout of the project, therefore all project records shall be maintained and made available at the time of request. Audits will be conducted in accordance with Generally Accepted Government Auditing Standards.

5.SPECIFIC PROVISIONS AND CONDITIONS

5.1 Project Schedule and Cost
See Project Programming Request Form, attached as Exhibit A.

5.2 Project Scope
See Project Report or equivalent, attached as Exhibit B. At a minimum, the attachment shall include the cover page, evidence of approval, executive summary, and a link to or electronic copy of the full document.

5.3 Performance Metrics
See Performance Metrics Form, if applicable, attached as Exhibit C.

Attachments:

Exhibit A: Project Programming Request Form
Exhibit B: Project Report
Exhibit C: Performance Metrics Form (if applicable)
m agrees to submit a timely Project Performance Analysis as specified in the Commission's SB 1 Accountability and Transparency Guidelines.

4.9 4.10 All signatories agree to maintain and make available to the Commission and/or its designated representative, all work related

5.4 Additional Provisions and Conditions
Project Baseline Agreement
(Please attach an additional page if additional space is needed.) City of Beaumont
City of Beaumont
City of Beaumont
City of Beaumont

Page 411 of 669 ends

Project Baseline Agreement Page 3 of 3

SIGNATURE PAGE
TO

PROJECT BASELINE AGREEMENT
Resolution
Date
Implementing Agency
Date
Date
District Director
California Department of Transportation
Tony Tavares
Director
California Department of Transportation
Date
Date
Project Applicant
Executive Director
California Transportation Commission
Project Name
(to be completed by CTC)
The State Route 60 (SR-60)/Potrero Boulevard Interchange Phase II Project Mayor Julio Martinez III
City of Beaumont
Mayor Julio Martinez III
City of Beaumont

Page 412 of 669 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION PROJECT PROGRAMMING REQUEST (PPR) PRG-0010 (REV 08/2020)
ePPR-5209-2023-0001 v0
PPR ID
Amendment (Existing Project)YES NO 11/16/2022 16:26:39Date Programs LPP-C LPP-F TCEPSCCP STIP Other
08 District
34142
EA
0800020445
Project ID PPNO
City of Beaumont
Nominating Agency
Co-Nominating Agency
SCAG
MPO
Local Assistance
Element
Jeff Hart
Project Manager/Contact
951-769-8520
Phone
[email protected]
Email Address
SR-60/Potrero Boulevard Interchange Phase II
Project Title
County Route PM Back PM Ahead
Riverside County 60 28.030 30.420
ON SR-60 BETWEEN JACK RABBIT TRAIL & SR-60/I-10 JUNCTION PHASE 2: NEW INTERCHANGE ON/OFF RAMPS. CONSTRUCT WESTBOUND/EASTBOUND EXIT RAMPS (2 LANES) and WESTBOUND/EASTBOUND LOOP ENTRY RAMPS (2 LANES) (ENTRY RAMPS INCLUDING HOV LANE), REALIGN WESTERN KNOLLS AVENUE, AND REMOVE WESTERN KNOLLS AVENUE CONNECTION TO SR-60.

Location (Project Limits), Description (Scope of Work)
Component Implementing Agency
City of BeaumontPA&ED
City of BeaumontPS&E
City of BeaumontRight of Way
City of BeaumontConstruction
Legislative Districts
42Assembly:23Senate:36Congressional:

Project Milestone Existing Proposed
Project Study Report Approved
Begin Environmental (PA&ED) Phase 02/05/2008
(ND/MND)/FONSICirculate Draft Environmental Document Document Type 05/21/2012 Draft Project Report 05/21/2012
End Environmental Phase (PA&ED Milestone)03/30/2016
Begin Design (PS&E) Phase 08/01/2016
End Design Phase (Ready to List for Advertisement Milestone)09/14/2023 Begin Right of Way Phase 04/01/2013
End Right of Way Phase (Right of Way Certification Milestone)05/01/2023 Begin Construction Phase (Contract Award Milestone)11/23/2023 End Construction Phase (Construction Contract Acceptance Milestone)11/23/2025 Begin Closeout Phase 01/01/2026
End Closeout Phase (Closeout Report)12/31/2026

Page 413 of 669 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION PROJECT PROGRAMMING REQUEST (PPR) PRG-0010 (REV 08/2020)
ePPR-5209-2023-0001 v0
PPR ID
11/16/2022 16:26:39Date
Provides access between north and south of, and full access to SR-60; Improve mailine operation along SR-60 by eliminating cross barrier traffic and access openings; Reduce forecasted mainline congestion on SR-60 and I-10; Provides efficient goods movement options for all modes of travel; Improve safety for five major interchanges / intersection.

Purpose and Need
NHS Improvements YES NO 2Roadway Class Reversible Lane Analysis YES NO Inc. Sustainable Communities Strategy Goals YES NO Reduce Greenhouse Gas Emissions YES NO Project Outputs
Category Outputs Unit Total
Operational Improvement Interchange modifications EA 1
Operational Improvement Auxiliary lanes Miles 0.49
Active Transportation Bicycle lane-miles Miles 0.75
Active Transportation Sidewalk miles Miles 0.89

Page 414 of 669 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION PROJECT PROGRAMMING REQUEST (PPR) PRG-0010 (REV 08/2020)
ePPR-5209-2023-0001 v0
PPR ID
11/16/2022 16:26:39Date
The project meets the current and future growth needs of increasing travel demands (vehicles and trucks); the project provides immediate traffic congestion relieves on I-10; the project provides immediate traffic congestion relieves at three major interchanges: the SR-60/I10 interchange, the I-10/Oak Valley interchange, and the I-10/SR-79 (Beaumont) interchange. The project improves traffic circulations of local network. The project will improve safety along SR-60 by eliminating undesirable egress and ingress access at SR-60 and Western Knolls intersection.

The project meets the current and future growth needs of increasing travel demands (vehicles and trucks); the project provides immediate traffic congestion relieves on I-10; the project provides immediate traffic congestion relieves at three major interchanges: the SR-60/I-10 interchange, the I-10/Oak Valley interchange, and the I-10/SR 79 (Beaumont) interchange. The project improves traffic circulations of local network. The project will improve safety along SR-60 by eliminating undesirable egress and ingress access at SR-60 and Western Knolls intersection.

Additional Information

Page 415 of 669 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION PROJECT PROGRAMMING REQUEST (PPR) PRG-0010 (REV 08/2020)
ePPR-5209-2023-0001 v0
PPR ID
Performance Indicators and Measures
Measure Required For Indicator/Measure Unit Build Future No Build Change Congestion
Reduction TCEP Change in Daily Vehicle Hours of Delay Hours 20,285 21,762 -1,477 TCEP Change in Daily Truck Hours of Delay Hours 1,257.67 1,305.72 -48.05 Throughput
(Freight)TCEP Change in Truck Volume # of Trucks 200,512 192,442 8,070 TCEP Change in Rail Volume # of Trailers 0 0 0
# of Containers 0 0 0
Velocity
(Freight)TCEP Travel Time or Total Cargo Transport Time Hours 6,715.6 6,895.1 -179.5 Air Quality &
GHG (only
‘Change’
required)

LPPF, LPPC, SCCP, TCEP
Particulate Matter PM 2.5 Tons 28.8 28.4 0.4
PM 10 Tons 30.3 29.8 0.5
LPPF, LPPC, SCCP, TCEP Carbon Dioxide (CO2)Tons 3,051,527 3,054,042 -2,515 LPPF, LPPC, SCCP, TCEP Volatile Organic Compounds (VOC)Tons 4,283.7 4,227.3 56.4 LPPF, LPPC, SCCP, TCEP Sulphur Dioxides (SOx)Tons 30.15 30.18 -0.03 LPPF, LPPC, SCCP, TCEP Carbon Monoxide (CO)Tons 48,600 48,172 428 LPPF, LPPC, SCCP, TCEP Nitrogen Oxides (NOx)Tons 5,573.8 5,494.3 79.5 Safety LPPF, LPPC, SCCP, TCEP Number of Fatalities Number 0 0 0 LPPF, LPPC, SCCP, TCEP Fatalities per 100 Million VMT Number 0 0 0 LPPF, LPPC, SCCP, TCEP Number of Serious Injuries Number 1.9 8.2 -6.3 LPPF, LPPC, SCCP, TCEP Number of Serious Injuries per 100 Million VMT Number 0.57 0.98 -0.41 Economic
Development LPPF, LPPC, SCCP, TCEP Jobs Created (Only ‘Build’ Required)Number 625 0 625 Cost
Effectiveness
(only ‘Change’
required)

LPPF, LPPC, SCCP, TCEP
Cost Benefit Ratio Ratio 3.41 0 3.41

Page 416 of 669 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION PROJECT PROGRAMMING REQUEST (PPR) PRG-0010 (REV 08/2020)
ePPR-5209-2023-0001 v0
PPR ID
08 District
34142
EA
0800020445
Project ID PPNO
Riverside County
County
60 Route
SR-60/Potrero Boulevard Interchange Phase II
Project Title
Existing Total Project Cost ($1,000s)
Component Prior 23-24 24-25 25-26 26-27 27-28 28-29+Total Implementing Agency E&P (PA&ED)City of Beaumont
PS&E City of Beaumont
R/W SUP (CT)City of Beaumont
CON SUP (CT)City of Beaumont
R/W City of Beaumont
CON City of Beaumont
TOTAL
Proposed Total Project Cost ($1,000s)Notes

E&P (PA&ED)
PS&E 2,000 2,000

R/W SUP (CT)

CON SUP (CT)
R/W
CON 48,000 48,000
TOTAL 2,000 48,000 50,000
Fund #1:Local Funds - City Funds (Committed)Program Code Existing Funding ($1,000s)
Component Prior 23-24 24-25 25-26 26-27 27-28 28-29+Total

E&P (PA&ED)
PS&E

R/W SUP (CT)

CON SUP (CT)
R/W
CON
TOTAL
City of Beaumont
Funding Agency
NotesProposed Funding ($1,000s)

E&P (PA&ED)
PS&E 2,000 2,000

R/W SUP (CT)

CON SUP (CT)
R/W
CON
TOTAL 2,000 2,000

Page 417 of 669 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION PROJECT PROGRAMMING REQUEST (PPR) PRG-0010 (REV 08/2020)
ePPR-5209-2023-0001 v0
PPR ID
Fund #2:Local Funds - City Funds (Committed)Program Code Existing Funding ($1,000s)
Component Prior 23-24 24-25 25-26 26-27 27-28 28-29+Total

E&P (PA&ED)
PS&E

R/W SUP (CT)

CON SUP (CT)
R/W
CON
TOTAL
City of Beaumont
Funding Agency
NotesProposed Funding ($1,000s)

E&P (PA&ED)
PS&E

R/W SUP (CT)

CON SUP (CT)
R/W
CON 8,000 8,000
TOTAL 8,000 8,000
Fund #3:Local Funds - TUMF (Committed)Program Code
Existing Funding ($1,000s)
Component Prior 23-24 24-25 25-26 26-27 27-28 28-29+Total

E&P (PA&ED)
PS&E

R/W SUP (CT)

CON SUP (CT)
R/W
CON
TOTAL
Western Riverside Council of Govern
Funding Agency
NotesProposed Funding ($1,000s)

E&P (PA&ED)
PS&E

R/W SUP (CT)

CON SUP (CT)
R/W
CON 6,500 6,500
TOTAL 6,500 6,500

Page 418 of 669 ends

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION PROJECT PROGRAMMING REQUEST (PPR) PRG-0010 (REV 08/2020)
ePPR-5209-2023-0001 v0
PPR ID
Fund #4:State SB1 TCEP - Trade Corridors Enhancement Account (Uncommitted)Program Code Existing Funding ($1,000s)
Component Prior 23-24 24-25 25-26 26-27 27-28 28-29+Total

E&P (PA&ED)
PS&E

R/W SUP (CT)

CON SUP (CT)
R/W
CON
TOTAL
California Transportation Commissio
Funding Agency
NotesProposed Funding ($1,000s)

E&P (PA&ED)
PS&E

R/W SUP (CT)

CON SUP (CT)
R/W
CON 33,500 33,500
TOTAL 33,500 33,500

Page 419 of 669 ends
Page 420 of 669 ends
Page 421 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

TABLE OF CONTENTS

1. INTRODUCTION .............................................................................................................................. 1

2. RECOMMENDATIONS ..................................................................................................................... 2

3. BACKGROUND ................................................................................................................................ 2 A. Project History ........................................................................................................................ 2 B. Community Interaction ........................................................................................................... 6 C. Existing Facility ....................................................................................................................... 6

4. NEED and PURPOSE ...................................................................................................................... 10 A. Problem, Deficiencies, Justification ....................................................................................... 10 B. Regional & System Planning ................................................................................................. 12 1) Identified Systems .......................................................................................................... 12 2) State Planning ................................................................................................................ 12 3) Regional Planning ........................................................................................................... 13 4) Local Planning ................................................................................................................ 13 5) Transit Operator Planning .............................................................................................. 13 C. Traffic ................................................................................................................................... 14 1) Existing and Forecasted Freeway Mainline Volumes ....................................................... 14 2) Projected Traffic Volumes .............................................................................................. 15 3) Impacts to Existing Interchanges .................................................................................... 19 4) Freeway Mainline and Ramps ......................................................................................... 19 5) Intersection Levels of Service ......................................................................................... 20 6) Accident Rates ................................................................................................................ 20

5. ALTERNATIVES ............................................................................................................................. 23 A. Viable Alternatives ............................................................................................................... 23 1) Proposed Engineering Features/Considerations: ............................................................ 23 2) Phased Interchange Features .......................................................................................... 25 3) Nonstandard Mandatory and Advisory Design Features ................................................. 27 4) Interim Features ............................................................................................................. 28 5) High Occupancy Vehicle (HOV) Bus and Carpool Lanes ................................................... 31 6) Ramp Metering .............................................................................................................. 31 7) CHP Enforcement Areas .................................................................................................. 31 8) Park and Ride Facilities ................................................................................................... 31 9) Utility and Other Owner Involvement............................................................................. 31 10) Railroad Involvement ..................................................................................................... 33 11) Highway Planting ........................................................................................................... 33 12) Erosion Control............................................................................................................... 33 13) Noise Barriers ................................................................................................................. 33 14) Non‐Motorized and Pedestrian Features ........................................................................ 33 15) Retaining Walls and Bridge Structures ............................................................................ 34 16) Life Cycle Cost Analysis ................................................................................................... 34 17) Needed Structure Rehabilitation and Upgrading ............................................................. 35 18) Cost Estimates ................................................................................................................ 35 19) Right of Way Data .......................................................................................................... 36

Page 422 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

B. Rejected Alternatives ........................................................................................................... 36

6. CONSIDERATIONS REQUIRING DISCUSSION .................................................................................. 37 A. Hazardous Waste ................................................................................................................. 37 B. Value Analysis ...................................................................................................................... 37 C. Resource Conservation ......................................................................................................... 39 D. Right of Way Issues .............................................................................................................. 39 1) Right‐of‐Way Required ................................................................................................... 39 2) Relocation Impact Studies .............................................................................................. 41 3) Airspace Lease Areas ...................................................................................................... 41 4) Utility and Other Owner Involvement............................................................................. 41 5) Railroad Involvement ..................................................................................................... 42 E. Environmental Issues ............................................................................................................ 42 F. Air Quality Conformity .......................................................................................................... 44 G. Title VI Considerations .......................................................................................................... 45 H. Noise Abatement Decision Report ........................................................................................ 45

7. OTHER CONSIDERATIONS AS APPROPRIATE ................................................................................. 45 A. Public Hearing Process .......................................................................................................... 45 B. Permits ................................................................................................................................. 46 C. Cooperative Agreements ...................................................................................................... 46 D. Other Agreements ................................................................................................................ 46 E. Transportation Management Plan for Use During Construction ............................................ 47 F. Stage Construction ............................................................................................................... 48 G. Accommodation of Oversize Loads ....................................................................................... 49 H. Graffiti Control ..................................................................................................................... 50

8. PROGRAMMING ........................................................................................................................... 50

9. REVIEWS ...................................................................................................................................... 51

10. PROJECT PERSONNEL ................................................................................................................... 51

11. LIST OF ATTACHMENTS ................................................................................................................ 52

Page 423 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

1 1. INTRODUCTION
The City of Beaumont (City), in cooperation with the California Department of Transportation (Caltrans), proposes to construct a new modified partial cloverleaf interchange including a bridge overcrossing at State Route 60 (SR‐60) for Potrero Boulevard.  Caltrans is the Lead Agency under the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

Alternatives considered for the proposed project beyond the “No‐Build” alternative were a spread diamond (Type L‐2) configuration, and a partial cloverleaf (Type L‐9) modified configuration.  On July 11, 2012, the Project Development Team (PDT) selected the partial cloverleaf (Type L‐9) modified configuration as the “Build” alternative, herein referenced as “project.” The project is located in the western end of the City within the San Gorgonio Pass area of Riverside County.  Attachment “A” shows the regional location and Attachment “B” illustrates the surrounding vicinity.

The project is identified in the City’s General Plan Circulation Element (2007) and in the Southern California Association of Governments (SCAG) 2012‐2035 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS). On April 4, 2012, the Regional Council of SCAG adopted the RTP/SCS. On June 4, 2012, the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) found the RTP/SCS and the 2010/2011 Federal Transportation Improvement Plan (FTIP) (thru Amendment 11‐24) to conform to the applicable State Improvement Plan (SIP). The design concept and scope of the project is consistent with the project description in the RTP/SCS (ID# RIV 050535)
Due to potential funding issues, the project will be constructed in two (2) phases.  Phase 1 will involve the construction of the Potrero overcrossing structure, installation of concrete median barrier throughout the project limits, and will include extending existing Potrero Boulevard, a 2‐lane local roadway, from 1,350‐ft north of the SR‐60 centerline to approximately 592‐ft south of SR‐60 centerline.   A temporary connection will be made to existing Western Knolls Avenue, a 2‐lane frontage road located north of SR‐60.  No ramp connections to the SR‐60 mainline will be constructed as part of Phase 1.  See Attachment “S”.

Phase 2 will involve constructing the remainder of the project to include eastbound and westbound on and off ramps; and the realignment of the existing Western Knolls Avenue frontage road.  See Attachment “T”.

Project costs for Phase 1 and Phase 2 are estimated to be $23.0M and $54.4M, respectively including roadway, structures, right of way, environmental mitigations, escalation, and capital outlay support.   Funding for both phases will primarily come from local traffic impact fees, and federal funds provided by Demo‐SAFETEA‐LU, Federal Appropriations Earmarks, and Surface Transportation Priorities programs.  Phase 1 is anticipated to start construction in Spring 2013 and be completed by Summer 2014.

Page 424 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

2 Phase 2 is anticipated to start construction in Summer 2014 and be completed by Summer 2015.

2. RECOMMENDATIONS
It is recommended that this Project Report and the Final Environmental Document be approved using the Build Alternative and that the project proceed to the next phase.

The City of Beaumont has been consulted with respect to the recommended project, their views have been considered, and the City is in general accord with the project as presented.

Construction Cooperative Agreements with the City of Beaumont were executed on January 26, 2012 and March 12, 2012 for Phase 1 (EA 34141) and Phase 2 (EA 34142) improvements, respectively.  These agreements define the responsibilities of both parties in the construction phase.  A separate maintenance agreement will be executed prior to the completion of the project.

3. BACKGROUND
A. Project History
On November 29, 1995, a Project Study Report (1995 PSR) was approved by Caltrans for a new interchange connection at SR‐60.  A design exception for nonstandard interchange spacing was prepared and also approved by Caltrans on this same date in conjunction with requirements of Design Information Bulletin (DIB) 77 – Interchange Spacing.  Soon after these approvals a Draft Project Report and Draft Environmental Document were prepared and submitted to Caltrans by the City, however, the project was put on hold due to the lack of funding and an unforeseen worsening of economic conditions. As such, all work associated with the Project Approval phase was put on hold.

Since then the City has continued to approve residential, commercial, and industrial developments north and south of SR‐60.  These projects have access to and from local roadways that essentially parallel SR‐60 and then connect to Interstate 10 (I‐ 10) at Oak Valley Parkway and at Beaumont Avenue (State Route 79).   As planned growth continues in the western area of the City, traffic forecasts indicate that I‐10 and SR‐60 will experience a high degree of congestion and delays unless an alternative access to the western area of the City is provided at SR‐60.

In July 2006, the City made a formal commitment to Caltrans to continue with the Project Approval/Environmental Document (PA/ED) phase for constructing a new interchange at Potrero Boulevard and SR‐60. A Cooperative Agreement for Project

Page 425 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

3 Development, which includes PA/ED; Plans, Specifications and Estimate (PS&E); and right of way acquisitions, was approved by the Beaumont City Council on February 5, 2008 and executed by Caltrans on February 28, 2008.

Conclusions presented in the 1995 PSR are updated as follows:

a) Interchange Justification – It was demonstrated in the 1995 PSR that existing intersections along SR‐60 (Jack Rabbit Trail) and/or local streets (Western Knolls Avenue) could not provide the necessary traffic level of service nor could they be improved to satisfactorily accommodate the design‐year traffic demands at that time.  Year 2035 forecasts continue to show that increases in traffic demands from the western area of the City will degrade levels of service on the SR‐60 and I‐10 mainlines.

Forecasts indicate that the project will reduce mainline average daily traffic (ADT) as trips are diverted to local roadways via the new interchange at SR‐60 as follows:

 Eastbound SR‐60 traffic that is interacting with the area north of SR‐60 and west of I‐10 could exit at the proposed Potrero Boulevard Interchange rather than travel through the I‐10/SR‐60 Junction and then exit at the Oak Valley/I‐10 Interchange. Vice versa, the traffic from the area north of SR‐60 and west of I‐10 could go westbound on SR‐60 by entering at Potrero Boulevard rather than traveling through the Oak Valley/I‐10 Interchange and the I‐10/SR‐60 Junction.

 Eastbound SR‐60 traffic that is interacting with the area north of SR‐60 and east of I‐10 could exit at the proposed Potrero Boulevard Interchange rather than travel through the I‐10/SR‐60 Junction and then exit at the Oak Valley/I‐10 Interchange. Vice versa, the traffic from the area north of SR‐60 and east of I‐10 could go westbound on SR‐60 by entering at Potrero Boulevard rather than traveling through the Oak Valley/I‐10 Interchange and the I‐10/SR‐60 Junction.

 Eastbound SR‐60 traffic that is interacting with the area south of SR‐60 and west of I‐10 could exit at the proposed Potrero Boulevard Interchange rather than travel through the I‐10/SR‐60 Junction and then exit at the Beaumont Avenue/I‐10 Interchange. Vice versa, the traffic from the area south of SR‐60 and east of I‐10 could go westbound on SR‐60 by entering it at Potrero Boulevard rather than traveling through the Beaumont Avenue/I‐ 10 Interchange and the I‐10/SR‐60 Junction.

Page 426 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

4 b) Consideration of Alternatives – Two (2) interchange alternatives were considered in the 1995 PSR ‐ a spread diamond configuration and a partial cloverleaf configuration.  The same alternatives were considered in the current traffic analysis.  See Section 5(A), “Alternatives” for more discussion. The current traffic impact analysis considered both configurations, and concluded that the partial cloverleaf configuration presents superior traffic operations over the spread diamond configuration.  The spread diamond configuration increased right of way needs and impacts to the environment. More right of way acquisitions at the northwest and southwest quadrants are required which would impact the adjacent planned development (Heartland).  As a result, the PDT decided to remove the spread diamond configuration from further consideration.

Other interchange locations on SR‐60 and improvements to existing interchanges were considered as follows:

 Jack Rabbit Trail/SR‐60 intersection – Providing a full access interchange at this location instead of the proposed location was considered during the alternative screening process. However, since an interchange was not included in the City’s General Plan Circulation Element or regional transportation plans governed by SCAG, RCTC, or WRCOG at this location, it was eliminated from further consideration.

 Oak Valley Parkway/I‐10 Interchange – Improvements at this interchange were considered. The City has prepared a separate PSR (EA 08‐0G280K) for this interchange which identifies improvements as a separate project.

Caltrans approved the PSR on December 15, 2009. The project did consider planned improvements by this project in the traffic impact analysis.

However, the project would not reduce service levels to current standards.

To accomplish the latter, major capacity improvements would be required with or without the project, which was deemed to be outside the scope of the project.

 Beaumont Avenue (SR 79)/I‐10 Interchange and I‐10/SR‐60 Junction – Both of these interchanges were evaluated by the traffic impact analysis, which concluded that the project will provide levels of service benefits at each location.  However, the project would not reduce service levels to current standards.  To accomplish the latter, major capacity improvements would be required with or without the project, which was deemed to be outside the scope of the project.

Page 427 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

5 c) Interchange Spacing – The minimum standard interchange spacing between a freeway‐to‐freeway interchange and local street interchange is 2.0 miles.   A mandatory design exception for interchange spacing was approved by Caltrans on November 28, 1995, allowing the spacing between the I‐10/SR‐60 Junction and the proposed interchange to be 1.53 miles.  The location of the proposed interchange remains unchanged from what was contemplated in the 1995 PSR; therefore, the approved Fact Sheet is still “valid” and is referenced herein.  The 2015 and 2035 traffic analysis concludes that all of the ramp merging and diverging points along SR‐60 associated with the project are forecasted to operate at acceptable levels of service.

d) No Significant Adverse Impact – The 1995 PSR concluded that the proposed interchange did not impact the safety and operation of SR‐60 based on year 2000 and 2020 traffic demands and would not present significant adverse impacts to the environment that could not be mitigated to less than significant.

This conclusion remains unchanged under the current project based on traffic impact analysis performed for year 2015 and 2035 and the results of environmental studies.

e) Connection to Public Roads – The 1995 PSR presented connecting Western Knolls Avenue with Potrero Boulevard by extending the existing frontage road to the west.  This proposal remains unchanged in the current project, however, since the time of the 1995 PSR, the City has completed construction of a 2‐lane roadway along the Potrero Boulevard northern alignment that will begin at Oak Valley Parkway, traverse south to just north of SR‐60 and then continues east to the western terminus of existing Western Knolls Avenue.  It is proposed to connect to the newly constructed improvements; however, the realignment and extension of Western Knolls Avenue to the northwest will also be constructed.

The project will also provide direct access to a future bypass route that would extend Potrero Boulevard to the south, which was not considered in the PSR.

The bypass route is currently being planned and designed by the Riverside County Transportation Department in cooperation with the City.  This bypass route will extend from the proposed interchange southerly and then easterly until it intersects State Route 79 (refer to Attachment “C”).  See Section 4(A), “Need for the Project”, for more discussion.

Other local roadways will connect to Potrero Boulevard in accordance with the City’s General Plan Circulation Element; namely, “B” Street, “C” Street, Willow Springs Road, and 4th Street, in the future (refer to Attachment “D”).

Page 428 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

6 f) Meets Local Planning – the project defined in the 1995 PSR was consistent with local and regional land use plans, however, at that time it was not included in SCAG’s RTP or RTIP.  Currently, the project is included in the 2008 RTP and RTIP which have also been approved by FHWA/FTA for air quality conformity.  See Section 4(B) (3), “Regional Planning” for more discussion.

g) Coordination with Development – development improvements were coordinated with the locally preferred alternative in mind.  Since approval of the 1995 PSR, the City continued to approve development plans within the western area of the City north and south of SR‐60.  The project has been updated taking into account approved and planned developments in the western area.  See Section 3(C), under “Existing Lands” for more discussion.

B. Community Interaction
On February 5, 2008, the Beaumont City Council approved entering into a Project Development Cooperative Agreement with the State for the project.  Since this was a publicly noticed meeting, Caltrans considered this meeting as being part of the public scoping and disclosure process. A Public Meeting (Open House format) was publically noticed and held on June 4, 2012 at Beaumont City Hall two (2) weeks after the beginning of the circulation period of the Draft Environmental Document (DED).  Caltrans and City staff attended this meeting to answer questions regarding the project. Written comments received at the meeting were collected and responses were included in the Final Environmental Document (FED).

C. Existing Facility
State Route 60

A connection to SR‐60 does not exist at the project location.  Currently, the portion of SR‐60 between Jack Rabbit Trail and Interstate 10 (I‐10)/SR‐60 Junction is a conventional 4‐lane divided highway (2 lanes in each direction) with two (2) intersections and three (3)  access openings.  Within the project limits, the existing SR‐60 mainline right of way varies in width and accommodates four (4) – 12‐ft lanes of traffic (two in each direction); standard 8‐ft shoulders; and a median width that varies from 21‐ft to 26‐ft.

As‐built plans indicate that the existing travel lanes are underlain by 0.40‐ft of asphalt pavement over 0.67‐ft of cement treated base (CTB) over 0.67‐ft of sub‐ base material.  However, pavement core samples taken within the project area indicate that the CTB and sub‐base material does not exist.   Asphalt pavement thicknesses along the eastbound lane (No. 1) and shoulder varied from 0.92‐ft to

1.29‐ft.  Along westbound lane (No. 1) and shoulder, the thickness varied from

Page 429 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

7 0.88‐ft to 1.48‐ft.  A recent maintenance project constructed by Caltrans installed a

0.1‐ft layer of rubberized hot mix asphalt (RHMA) over the travel lanes. Field reviews did not find significant areas of pavement distress within the limits of the project.

The existing mainline pavement section, constructed in the 1956, was evaluated for remaining service life and it was determined that it should be removed and replaced with a rigid pavement section.  This was deemed to be outside the scope of the project.

Along the SR‐60 mainline, an existing bridge (San Timoteo Creek Bridge No. 56‐ 0065) crosses Coopers Creek which is a tributary to San Timoteo Creek.  On‐site drainage flows enter parallel drainage ditches within the median and along the outside edges of the mainline.  Flows collected in the median ditches are conveyed through underground pipelines to the mainline edges, and then to Coopers Creek via earthen and concrete drainage swales.

The existing intersections and access openings are shown on Attachment “E” and are described as follows:

 Jack Rabbit Trail (JRT) (PM 27.97) is an existing at‐grade intersection at SR‐60.

Eastbound traffic on SR‐60 can exit from the mainline to southbound JRT from via an off‐ramp. Westbound traffic on SR‐60 can access southbound JRT from a dedicated left turn pocket that allows vehicles to cross eastbound SR‐60 lanes.

Northbound JRT traffic can turn left onto westbound SR‐60 lanes and continue eastbound onto SR‐60 via an on‐ramp.

 Location 1 (PM 28.48) is a 20‐ft opening in access control that allows ingress and egress to private lands and an existing cell tower site south of SR‐60.

 Location 2 (PM 29.40) is a 30‐ft opening in access control that allows ingress and egress to private land located south of SR‐60.

 Location 3 (PM 29.40) is an existing at‐grade intersection at the western end of Western Knolls Avenue (WKA), a 2‐lane frontage road located along the north side of SR‐60.   A concrete median barrier was constructed by Caltrans (from PM

28.2 to PM 29.9) at this location to prevent vehicles from crossing the SR‐60 median.  Right‐in and right‐out movements are currently allowed.

 Location 4 (PM 29.93) is an existing at‐grade intersection with the same WKA frontage road at its eastern end.  Eastbound traffic on SR‐60 can turn left into

Page 430 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

8 the frontage road using a dedicated left turn pocket.  Traffic destined for eastbound SR‐60 can cross the westbound SR‐60 lanes; then wait in the median until they can proceed onto eastbound SR‐60 traffic lanes.

Additionally, an operating business (Dowling Orchards) exists at this location along the south side of SR‐60. Eastbound traffic on SR‐60 can exit and enter the mainline at this location.  Westbound traffic on SR‐60 can turn left from the mainline to enter this location and turn left from the location to continue westbound.  These cross‐median movements are not compatible with the traffic demands and current freeway speeds along SR‐60.

Interstate 10

Interstate 10 is a 6‐lane freeway (3 lanes in each direction) with standard 10‐ft shoulders and a median width of 36‐ft.  The I‐10/SR‐60 Junction, located between Oak Valley Parkway Interchange and Beaumont Avenue (SR 79) Interchange, is a freeway‐to‐freeway interchange.

Both I‐10 and SR‐60 are functionally classified as Urban Principal Arterials; are listed in the California Freeway and Expressway System; included in the National Network for Federal Surface Transportation Assistance Act (STAA) for Oversized Trucks; are in the Transportation Gateways of Statewide Significance; and are Intermodal Corridors of Economic Significance (ICES) in Caltrans Interregional Transportation Strategic Plan (ITSP).

Local Roadways

The City constructed a new 2‐lane roadway that extends westerly from Western Knolls Avenue and then continues to the north along the Potrero Boulevard alignment to Oak Valley Parkway, a major east‐west arterial roadway.  Other local roadways, such as 4th Street, a parallel roadway south of SR‐60, provide access to existing, planned, and future commercial/industrial developments located immediately south of SR‐60. Together, these local roadways provide access to the western area of the City (refer to Attachment “F”).

Existing Lands

The existing lands surrounding the location of the project are mainly vacant and undeveloped.  Access to these lands occurs primarily from the local roadways mentioned above. A single residential unit and a few commercial businesses are located north of SR‐60 and west of the I‐10/SR‐60 Junction.

Page 431 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

9 Site grading and other construction activities are on‐going northwest of the project for what is commonly known as the Heartland project, a large‐scale development that will consist of more than 1,000 residential homes and commercial areas located to the west of Potrero Boulevard and north of SR‐60.   Attachment “F” depicts the state of developed and undeveloped lands in the project area as of 2009.  Attachment “G” depicts the designated land uses included in the City of Beaumont General Plan (2007) which guides the future development of the lands surrounding the project.  Attachment “H” identifies the planned development projects north and south of SR‐60 within the vicinity of the project.

Existing Access and Interchange Configurations
Existing access to SR‐60 occurs at the Jack Rabbit Trail Interchange and the I‐10/SR‐ 60 Junction.  Table 3.1 presents a summary of the distances anticipated between these existing access points and the project with their respective interchange configurations:

Table 3.1 – Interchange Distances from Proposed Interchange Location PM Configuration Distance from Proposed
Interchange (Miles)
Jack Rabbit Trail 27.97 Public Road
intersection 0.94
Proposed Potrero
Boulevard IC 28.91 Modified Type L‐9  0.00
I‐10/SR‐60 Junction 30.44 Freeway‐to‐Freeway 1.53

Anticipated impacts to these adjacent interchanges and intersections due to the project are as follows:

 Operational analysis indicates that traffic demands for the I‐10/SR‐60 Junction will decrease in the year 2035 with the project.  Surface ramp intersections at the Junction are forecasted to operate at levels of service (LOS) “F” without the project.  They will operate at LOS “A” with the project. See Section 4(C), “Traffic” for more discussion.
 The interchange spacing between the existing I‐10/SR‐60 Junction and the proposed interchange will not meet standard interchange spacing requirements of two (2) miles per Design Information Bulletin (DIB) 77.  A Fact Sheet for

Page 432 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

10 nonstandard interchange spacing of 1.53 miles was approved by Caltrans on November 29, 1995.
 The spacing between the existing Jack Rabbit Trail intersection and the proposed interchange exceeds the spacing requirements of 1/2 mile for openings along expressways.  The spacing between the proposed interchange and this intersection was approved with the November 29, 1995 Fact Sheet.

This intersection experiences very low traffic volumes (less than 100 average daily traffic).  Therefore, no impacts to its operations are anticipated due to the project.

4. NEED and PURPOSE
A. Problem, Deficiencies, Justification
The Need and Purpose for the project was reviewed and approved by the Project Development Team (PDT) in June 2011.  The purpose of the project is to:
 Provide access between north and south of, and full access to, SR‐60  Improve mainline operations along State Route 60 (SR‐60) by eliminating cross barrier traffic and access openings
 Reduce forecasted mainline congestion
Need for the Project
The project is being initiated by the City of Beaumont to mitigate increased traffic volumes in the area associated with future development and to implement the City’s General Plan.  Significant growth is anticipated in the near future in this area from approved development.  There is currently no access from north of SR‐60 to the south except via crossing the expressway median at Western Knolls Avenue (East).
a) Need to provide access between north and south of, and full access to, SR‐60 ‐ In its current condition the SR‐60 mainline effectively acts as a physical barrier between developed and undeveloped lands located north and south of the mainline.  Access to existing lands (developed and undeveloped) with in the western area of the City is limited to two interchanges along I‐10 – at Oak Valley Parkway (OVP) and Beaumont Avenue (SR‐79). Traffic analyses show that as growth increases in the western area, these interchanges, as well as, SR‐60 and I‐10 would degrade in level of service.  The new interchange would provide a north‐south crossing (Potrero Boulevard) at SR‐60 that would allow for a redistribution of traffic into and within the western area of the City.  The City’s General Plan Circulation Element calls for the new interchange and the north‐ south roadway connection to existing east‐west roadways, OVP and 4th Street.

Page 433 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

11 The project would provide a new north‐south roadway overcrossing (Potrero Boulevard) at SR‐60.  This overcrossing would allow local traffic destined for the western area of the City to move across SR‐60 without affecting SR‐60 mainline operations.  Additionally, the north‐south crossing would reduce east‐west traffic that must use the Oak Valley Parkway and Beaumont Avenue (SR‐79) interchanges.
b) Need to improve mainline operations along SR‐60 by eliminating cross barrier traffic and access openings ‐ Along SR‐60, traffic flows along the eastbound and westbound mainline lanes are affected by existing at‐grade intersections located at Jack Rabbit Trail; at the east and west ends of Western Knolls Avenue (a 2‐lane frontage road located on the north side of the mainline); and at three (3) other access openings located along the south side of the mainline.  Vehicles exit and enter SR‐60 from these intersections and access openings while mainline traffic travels at high speeds, sometimes in excess of 70 miles per hour.

Table 4.6 presents a summary of accident information obtained from Caltrans’ Traffic Accident Surveillance and Analysis System (TASAS) Table B Report from July 1, 2006 thru March 31, 2010. Attachment “E” identifies these intersections and access openings.
c) Need to reduce forecasted mainline congestion ‐ Year 2035 traffic forecasts along SR‐60 and I‐10 indicate that mainline levels of service would degrade to unacceptable levels of service, resulting in increased congestion and delays to local and regional traffic Existing 2010 Average Daily Traffic (ADT) volumes along SR‐60 are 51,300 vehicles per day (vpd).  Forecasted 2035 ADT along SR‐ 60 would increase by 171.7%.  Along I‐10, existing 2010 ADT are 103,700 vpd west of the I‐10/SR‐60 Junction and 144,800 vpd east of the I‐10/SR‐60 Junction.  Forecasted 2035 ADT along I‐10 would increase respectively by 102.4% and 70.4%.

Due to these forecasted increases in traffic demands, the mainline freeways (SR‐60 and I‐10) and existing interchanges at Oak Valley Parkway/I‐10, Beaumont Avenue (SR‐79)/I‐10, and the I‐10/SR‐60 Junction would degrade to unacceptable levels of service that would result in severe congestion and impacts to the travelling public.

To address this condition, the City is sponsoring the project, a new interchange on SR‐60 that would effectively change travel patterns within the western area of the City. The project acting in conjunction with other planned local roadways would result in providing relief to the areas of future congestion noted earlier by removing traffic from SR‐60 and I‐10 to the local roadway system.

Page 434 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

12 B. Regional & System Planning
1) Identified Systems

The project will be located on SR‐60 which provides interregional mobility between the commercial centers of Los Angeles, Riverside, and San Bernardino areas.  Within District 8 in San Bernardino and Riverside Counties, SR‐60 extends a distance of approximately 40.5 miles as an east‐west Principal Arterial.  SR‐60 varies in width from four (4) lanes in rural areas to ten (10) lanes in urbanized areas.  The total length of the route is approximately 70.4 miles beginning near the junction of I‐5 and I‐10 in Los Angeles County and terminates at the junction with I‐10 in the City and in Riverside County.

2) State Planning

In August 1999, Caltrans adopted a Route Concept Fact Sheet (RCFS) for SR‐60 between San Bernardino (PM R0.0) and Riverside (PM R30.5).  The RCFS calls for expanding SR‐60 from four (4) lanes to eight (8) lanes from Perris Boulevard to the I‐10/SR‐60 Junction.  Two of the additional lanes are planned to be High Occupancy Vehicle (HOV) lanes (one in each direction) within the latter Post Mile (PM) limits and beyond.

Caltrans is in the process of preparing a final draft of a Transportation Corridor Concept Report (TCCR) for SR‐60.  A preliminary analysis of the segment that the project lies within indicates that in order to maintain a concept Level of Service “D” through 2035, three (3) lanes (in each direction) built to freeway standards plus two (2) HOV lanes are needed.  The Ultimate Transportation Corridor (UTC) requires adequate right of way for five (5) lanes (four mixed‐flow and one HOV) in each direction on the mainline for a total of ten (10) lanes.  This does not include right of way for auxiliary lanes and sound walls which may be needed as the area continues to develop.

The design of the proposed Potrero Boulevard overcrossing bridge structure is planned to accommodate the ten (10) lane freeway section.  When implemented, slope paving adjacent to the eastbound and westbound loop on‐ramps will be removed and replaced with tie‐back retaining walls.

Attachment “I” depicts how the proposed bridge structure will accommodate eight (8) and ten (10) freeway lanes on SR‐60.

Page 435 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

13 3) Regional Planning
The project is identified in the City’s General Plan Circulation Element (2007) and in the Southern California Association of Governments (SCAG) 2012‐2035 Regional Transportation Plan/Sustainable Communities (RTP/SCS). On April 4, 2012, the Regional Council of SCAG adopted the RTP/SCS. On June 4, 2012, the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) found the RTP/SCS and the 2010/2011 Federal Transportation Improvement Plan (FTIP) (thru Amendment 11‐24) to conform to the applicable State Improvement Plan (SIP). The design concept and scope of the project is consistent with the project description in the RTP/SCS (ID# RIV 050535)

4) Local Planning

The project is included in the March 2007 City of Beaumont General Plan Circulation Element.  The new Potrero Boulevard/Western Knolls Avenue intersection is shown as Potrero Boulevard/“C” Street in this document.  The project is identified in the Western Riverside Council of Governments Transportation Uniform Mitigation Fee (TUMF) program, and the County of Riverside General Plan.

5) Transit Operator Planning
The project is located on SR‐60, providing linkage between the western area of the City and interregional travel between the commercial centers of Los Angeles, Riverside, and San Bernardino areas.  The Riverside Transit Agency (RTA) provides regional bus service between the cities of Riverside, Banning, Beaumont, and Moreno Valley using SR‐60 thru the following systems:
 Line 35 – from the Moreno Valley Mall (in Moreno Valley) with stops at K‐ Mart, two Walmart’s (one in Moreno Valley and the other in the Beaumont/Banning area), and the Riverside County Medical Center.

 Line 210 – from Banning and Beaumont to Downtown Riverside Terminal via Moreno Valley and Riverside Metrolink Station.

Regional bus services from these Lines are coordinated with Pass Transit, which serves the local communities of Beaumont and Banning.  The project would not affect existing bus services.

Page 436 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

14 C. Traffic
1) Existing and Forecasted Freeway Mainline Volumes

Congestion along SR‐60 is attributed to heavy commuter traffic during the weekdays.  Congestion and delays are expected to increase along with the continued growth that is projected for the region.  Table 4.1 presents existing 2010 Average Daily Traffic (ADT), forecasted ADT for year 2015 (opening year), and forecasted ADT for year 2035 as follows:

Table 4.1 – Existing and Forecasted ADT on SR‐60
Limits Mainline Existing
Year 2010
2015 ADT
% Increase
2035 ADT
% Increase
Without Project
West of I‐
10/SR‐60
Junction(1)
SR‐60 51,300 67,800
+32.2%
139,400
+171.7%
With Project
Potrero Blvd
IC to I‐10/SR‐
60 Junction
SR‐60 51,300 63,600
+24.0%
128,900
+151.3%
(1) Jack Rabbit Trail ADT is nominal at less than <100 vehicles/day.

Source:  SR‐60/Potrero Interchange Traffic Impact Analysis (March 2010)

As can be seen, 2015 and 2035 ADT volumes along SR‐60 will increase with or without the project.  However, with the project, a reduction of 2015 ADT volumes equaling 10,500 trips (or 7.5%) is forecasted in the year 2035.  Year 2015 forecasts show that a 4,200 trip (or 6.2%) reduction is expected.  These ADT reductions will directly benefit the SR‐60 mainline operations as congestion and delays are minimized.

Table 4.2 compares 2015 and 2035 ADT volumes along I‐10.  Similarly, ADTs on this facility will increase with or without the project.  However, with the project, a reduction of 2015 ADT volumes equaling 10,500 trips (or 2.9%) west of I‐10/SR‐60 Junction and 2,000 trips (or 1.2%) east of I‐10/SR‐60 Junction is forecasted.  In 2035, ADT volumes will reduce by 50,000 trips (or 15.5%) west of the I‐10/SR‐60 Junction with no change east of the I‐10/SR‐60 Junction.

These results indicate that I‐10 mainline operations will also benefit from the project in reducing congestion and delays.

Page 437 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

15 Table 4.2 – Existing and Forecasted ADT on I‐10
Limits Mainline Existing
Year 2010
2015 ADT
% Increase
2035 ADT
% Increase
Without Project
West of I‐10/SR‐60
Junction I‐10 103,700 122,900
+18.5%
209,900
+102.4%
East of I‐10 /SR‐60
Junction I‐10 144,800 166,100
+14.7%
246,800
+70.4%
With Project
West of I‐10/SR‐60
Junction I‐10 103,700 112,400
+8.4%
159,900
+54.2%
East of I‐10 /SR‐60
Junction I‐10 144,800 164,100
+13.3%
246,800
+70.4%
Source: SR‐60/Potrero Interchange Traffic Impact Analysis (March 2010)

Table 4.3 and Table 4.4 compares mainline forecasted LOS along I‐10 and SR‐ 60 in the morning (AM) and evening (PM) “peak periods” with the project and without the project. Black colored cells highlight LOS “F” conditions and grey cells highlight LOS “E” conditions.  Under these conditions, the travelling public will encounter significant and considerable delays.   The comparison illustrates the benefits that the project will provide to the traveling public.

2) Projected Traffic Volumes

The projected traffic volumes at studied intersections for Year 2015 and 2035 with and without the project are presented in Table 4.5.  The LOS for intersections studied within the project area is improved or remain unchanged with the project except for under the following Year 2035 conditions:

a) Intersection #6 ‐ Potrero Blvd and “C” Street – AM LOS lowered from “C” to “D”.  The lower LOS is within acceptable levels per City standards.  Note that this intersection coincides with the new Potrero Blvd/Western Knolls Avenue intersection.

b) Intersection #10 – I‐10 EB Ramps/Oak Valley Pkwy – AM LOS lowered from “C” to “F”.  PM LOS is “F” with or without the new interchange.

Page 438 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

16 Source: SR‐60/Potrero Interchange Traffic Impact Analysis (March 2010)

Page 439 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

17 Source: SR‐60/Potrero Interchange Traffic Impact Analysis (March 2010)

Page 440 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

18 Table 4.5 – Level of Service at Studied Intersections Intersection
2015
Without Project
2015
With Project
2035
Without Project
2035
With Project
Delay
(Sec)
Level of
Service
Delay
(Sec)
Level of
Service
Delay
(Sec)
Level of
Service
Delay
(Sec)
Level of
Service
No. Name AM PM AM PM AM PM AM PM AM PM AM PM AM PM AM PM 1 Potrero Boulevard (NS)
Oak Valley Pkwy (EW) 28.9 22.7 C C 5.7 4.4 A A 20.3 23.8 C C 8.8 12.2 A B 2 Potrero Boulevard (NS)
"B" Street (EW) 22.0 16.0 C B 5.5 8.5 A A 26.6 26.1 C C 9.2 28.4 A C 3 Potrero Boulevard (NS)
"C" Street (EW) 51.0 20.8 D C 9.0 8.6 A A 25.8 40.1 C D 37.1 35.9 D D 4 Potrero Boulevard (NS)
SR-60 WB Ramps (EW) 5.3 5.0 A A 11.6 14.6 B B 5 Potrero Boulevard (NS)
SR-60 EB Ramps (EW) 6.4 6.4 A A 9.9 16.7 A B 6 Potrero Boulevard (NS)
Willow Springs Road
(EW) 25.9 24.7 C C 13.0 14.6 B B 28.3 50.2 C D 35.0 36.9 D D 7 Potrero Boulevard (NS)
4th Street (EW) 26.2 24.7 C C 14.9 13.0 B B 40.1 37.3 D D 30.2 32.2 C C 8 Desert Lawn Drive (NS)
Oak Valley Pkwy (EW) 13.5 13.3 B B 10.6 11.8 B B 23.4 -- C F 19.1 29.5 B C 10 I-10 EB Ramps (NS)
Oak Valley Pkwy (EW) 19.5 22.1 B C 12.1 12.9 B B 22.9 -- C F 23.6 -- F F 11 I-10 WB Ramps (NS)
Oak Valley Pkwy (EW) 24.3 22.8 C C 10.9 11.5 B B 43.3 -- D F 15.3 20.6 B C 12A
SR-60 & I-10 EB Off
Ramp (NS)
I-10 EB On Ramp & 6th
St (EW) 3.2 4.9 A A 1.0 1.8 A A 11.9 -- B F 0.6 5.0 A A 12B Viele Ave (NS)
6th Street (EW) 12.3 11.8 B B 5.4 6.2 A A 31.6 -- C F 7.4 10.5 A B 13 Beaumont Avenue (NS)
6th Street (EW) 45.3 44.1 D D 25.2 25.4 C C 60.2 -- F F 39.6 54.3 D F 15 Beaumont Ave (NS)
I-10 WB Ramps (EW) 21.3 29.1 C C 16.3 16.4 B B -- -- F F -- -- F F 16 Beaumont Ave (NS)
I-10 EB Ramps (EW) 8.1 10.0 A A 4.0 5.1 A A -- -- F F 8.9 -- A F “‐‐“= Traffic Volume greater than capacity – LOS is “F” Source: SR‐60/Potrero Interchange Traffic Impact Analysis (March 2010)

Page 441 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

19 3) Impacts to Existing Interchanges

a) Jack Rabbit Trail Intersection – No impacts will occur at this interchange due to the project.  Since existing and projected traffic volumes are relatively low, LOS degradations will be nominal.  In the approved traffic analysis, this interchange is removed in 2035 assuming that a local roadway south of and parallel to SR‐60 will be constructed prior to this year.

b) I‐10/SR‐60 Junction – Once constructed, the project significantly changes the overall circulation pattern within the project area.  In year 2035, up to 708 vehicles per hour will be removed from this Junction as the traveling public will have other options to access adjacent residential communities and commercial businesses.  Per Table 4.5, the Junction will operate at LOS “A” in both the AM and PM peak hour. Without the proposed interchange, the Junction would operate at LOS “B” and “F” levels in the AM and PM peak hour, respectively.

c) I‐10/Oak Valley Parkway Interchange – As noted, once constructed, the project will improve the level of service at the westbound ramps.

However, level of service for eastbound ramps will degrade in the AM period from “C” to “F”.  A separate Project Study Report (EA 08‐0G280K) for this interchange was approved by Caltrans on December 15, 2009.

Results of that study indicate that the LOS for the eastbound ramps will operate at LOS A in the AM period and LOS B in the PM period under year 2030 conditions.

d) I‐10/Beaumont Avenue (SR‐79) Interchange – The westbound ramps at this interchange operate at LOS “F” with or without the interchange.

Significant improvement to the AM LOS occurs after the proposed project is constructed (“F” to “A”), however, PM LOS remains at “F” levels with or without the proposed interchange.   Currently, there are no plans to improve this interchange by the City or Caltrans.  Any improvements to this interchange would be outside the scope of the project.

4) Freeway Mainline and Ramps

Tables 4.3 and 4.4 indicate that the LOS for the SR‐60 mainline will improve as a result of the project.  This is due to the distribution of traffic off SR‐60 to the local roadway systems.  Table 4.5 shows that the ramp intersections at the proposed interchange will operate in 2035 for the westbound ramp termini at LOS “B” in the AM peak hour and LOS “B” in the PM peak hour.

Page 442 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

20 The eastbound ramp termini will operate at LOS “A” and LOS “B’ for the AM and PM peak hours, respectively.

5) Intersection Levels of Service

Per Table 4.5, out of the fifteen (15) intersections studied, all will either improve in LOS due to the project or will remain unchanged from existing deficiencies.  The Beaumont Avenue (SR‐79)/I‐10 interchange will have some operational improvements in 2035 at the eastbound ramp intersection due to the project.  The westbound ramp intersection will have operational improvements from the project in 2015.  However, it is recommended that a separate operational analysis for this interchange be done separately.

6) Accident Rates

Table 4.6 presents a summary of accident information obtained from the Traffic Accident Surveillance and Analysis System (TASAS) Table B Report from July 1, 2006 thru March 31, 2010.

Factors that could play a role in causing the types of accidents indicated in Table 4.6 are: driving under the influence (DUI), speeding, not paying attention, slippery roadway due to rain, following too close, fog, etc.

Caltrans constructed a concrete (Type 60) median barrier between PM 28.8 and PM 29.9 in November 2007 (EA 0G460) at the western end of the Western Knolls Avenue intersection to restrict movements to right‐in/right‐ out from westbound SR‐60 traffic. All movements to and from SR‐60 at this intersection and at the eastern intersection at Western Knolls Avenue (WKA) will be closed as part of Phase 2. A cul‐de‐sac will also be constructed at the eastern end of WKA.

As can be seen from Table 4.6, under “Actual Accident Rates” fatality and injury accidents along SR‐60 and at Jack Rabbit Trail are below the “Statewide Average Accident Rates” for similar types of state highways.  At Locations 1, 2, 3, and 4 the total “Actual Accident Rates” (highlighted in bold text) exceed the total “Statewide Average Accident Rates.”  The number and types of accidents that occurred at these locations are shown in Table 4.7.

Page 443 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

21 Table 4.6 ‐ TASAS Data – July 1, 2006 thru March 31, 2010 Location
Total No.

Accident
s
Fatality
Accident
Injury
Accident
Actual Accident Rates
(Per Million Vehicle Miles)
Statewide Average
Accident Rates
(Per Million Vehicle
Miles)
F F+I Total F F+I Total
SR‐60
PM 27.50 to
PM 30.494
130 1 48 .005 .27 .71 .014 .36 .90
Jack Rabbit
Trail
PM 27.97
10 0 4 0(a) .07(a) .16(a) .003(a) .08(a) .20(a)
Location 1
PM 28.48 10 0 4 0(a) .07(a) .16(a) .001(a) .06(a) .15(a) Location 2
PM 29.40 10 0 3 0(a) .05(a) .16(a) .001(a) .06(a) .15(a) Location 3
PM 29.40
Westbound
11 0 4 0(a) .07(a) .18(a) .001(a) .06(a) .15(a)
Location 4
PM 29.93
Eastbound
20 0 11 0(a) .18(a) .33(a) .001(a) .06(a) .15(a)
Source:  Caltrans District 8 (April 2011)
Note:  PM location begins just west of Jack Rabbit Trail and ends west of the I‐10/SR‐60 Junction (a)  Accident rate denoted as per million vehicles
PM = Postmile   F = Fatality   I = Injury
The project would close and remove the intersections at Locations 3 and 4 (Western Knolls Avenue [East and West]) and the access openings to SR‐60 at Locations 1 and 2, which should reduce the number of accidents shown above.  Access from Location 1 would remain in place to perpetuate access to lands located south of SR‐60 under Phase 1; however, the City intends to close this access by requiring the construction of a local frontage road as a condition of future development or as an independent project prior to the completion of Phase 2.

Page 444 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

22 Table 4.7 ‐ Traffic Accident Types
Location Sideswipe Rear End Broadside Hit Object
Jack Rabbit
Trail
PM 27.97
3 2 2 3
Location 1
PM 28.480
3 2 2 3
Location 2
PM 29.400
2 4 2 2
Location 3
PM 29.400
Westbound at
WKA
2 3 3 3
Location 4
PM 29.93
WKA/Dowling
Orchards
4 6 6 4
Source:  Caltrans TASAS (July 1, 2006 thru March 31, 2010) Access to businesses and residences along Western Knolls Avenue would be provided from the new interchange and the westerly extension of Western Knolls Avenue until it intersects Potrero Boulevard.  Access to the existing business, Dowling Orchards (at Location 4), will be provided via the construction of a new roadway extending from 4th Street as part of the Dowling Business Park development.  Access from SR‐60 would remain until the new roadway is constructed prior to the completion of Phase 2.  The Jack Rabbit Trail intersection will continue to remain in place. The Western Knoll Avenue intersections would ultimately be removed.  It is anticipated that removal of the intersections and access openings would reduce collisions and injuries that are occurring along present day SR‐60.

Page 445 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

23 5. ALTERNATIVES
The project has been assigned to Project Development Category 3 because it is a new interchange on a previously constructed access controlled route requiring new right of way.

A.  Viable Alternatives
Three (3) alternatives were identified and considered for the project as follows:

 No Build – No improvements proposed.

 Partial Cloverleaf (Locally Preferred Alternative) ‐ Construct a new modified partial cloverleaf interchange (Type L‐9).

 Spread Diamond ‐ Construct a new spread diamond interchange (Type L‐2).

A Value Analysis (VA) study was done and confirmed the Partial Cloverleaf configuration as the locally preferred alternative for the new connection to SR‐60.

Preliminary engineering was performed to develop the ultimate geometric layout for the partial cloverleaf configuration to establish future right of way limits and to develop overall environmental impacts.

The PDT selected the Partial Cloverleaf alternative as the proposed build project on July 11, 2012.

1) Proposed Engineering Features/Considerations:

The project will include the following engineering features/considerations:

a) A modified Type L‐9 interchange configuration will be constructed.

b) Potrero Boulevard will be constructed to six (6) lanes (three northbound and three southbound) between Willow Springs Parkway and Western Knolls Avenue.

c) Traffic signals will be constructed along Potrero Boulevard at the following locations:

1. Eastbound ramps termini (new)

2. Westbound ramps termini (new)

3. Potrero Boulevard and Western Knolls Avenue (new)

Page 446 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

24 d) A six (6)‐lane overcrossing bridge structure at SR‐60 (three lanes in each direction) with a 14‐ft raised median separation, one 14‐ft inside lane in each direction; two 12‐ft lanes in each direction; 10‐ft shoulders, and 6‐ ft pedestrian sidewalks on both sides.

e) The existing SR‐60 mainline bridge (San Timoteo Creek Bridge No. 56‐ 0065) crossing Coopers Creek will be widened to the south to accommodate the approach auxiliary lane to the eastbound off‐ramp.

f) The eastbound off ramp, eastbound diagonal on ramp and eastbound loop on ramp will be constructed to 2035 lane requirements.  Ramp metering infrastructure and CHP enforcement areas will be provided on the on ramps.

g) The westbound off ramp, westbound loop on ramp, and westbound diagonal on ramp will be constructed to 2035 lane requirements.  Ramp metering infrastructure and CHP enforcement areas will be provided on the on ramps.

h) A westbound and eastbound approach auxiliary lane will be constructed in advance of the eastbound and westbound off ramps.

The design of the pavement section for the auxiliary lanes will consider these lanes to be future mixed flow lanes.

i) Right of way will be acquired for the interchange and local roadway improvements.

j) Western Knolls Avenue will be realigned and extended from its western terminus to Potrero Boulevard.  One lane each direction will be constructed with 8‐foot shoulders.

k) Existing utilities that interfere with the project will be relocated.

Interfering utilities such as overhead power lines and underground pipelines that will lie within the proposed State right of way will be relocated outside State right of way.  Utility easements for the relocated utilities will be acquired.

l) Retaining walls will be constructed along the south side of the eastbound off ramp and along the north and south sides of the westbound diagonal on ramp.

Page 447 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

25 2) Phased Interchange Features

Currently, planned developments located north and south of SR‐60 have slowed down in construction due to a depressed economy.  Additionally, obtaining full funding for construction of the entire project is also difficult due to economic conditions.   To move the project forward, the City has decided to construct the project into two (2) phases.  The first phase will construct a 6‐lane bridge overcrossing at SR‐60 that will provide better north‐ south circulation within the western area.  There will be no connection to SR‐ 60 in this phase.  The second phase will construct the remaining portion of the project that will provide for ramp connections to the mainline.

Construction of the second phase is anticipated to be completed by Summer 2015.

Accordingly, the engineering features of the two phases are described as follows:

PHASE 1   (See Attachment “S”)

 Potrero Boulevard will be constructed to two (2) lanes (one in each direction) starting approximately 592 feet south of SR‐60 centerline and ending approximately 1,350 feet north of SR‐60 centerline until it connects to existing Potrero Boulevard.

 Demolition of portions of the existing 2‐lane Potrero Boulevard/Western Knolls Avenue roadway and construction of a new intersection just north of SR‐60.

 Construct a new six (6)‐lane bridge overcrossing striped for two lanes at SR‐60.  The bridge overcrossing will ultimately accommodate a 14‐ft raised median separation, one 14‐ft inside lane in each direction, two 12‐ ft lanes in each direction, 10‐ft shoulders, and a 6‐ft pedestrian sidewalk on both sides.

 Remove existing median pavement and construct a new concrete median barrier, new median pavement along SR‐60 across the eastern Western Knolls Avenue intersection, and new metal beam guardrail.  Access to SR‐ 60 would be restricted to right‐in/right‐out movements at Western Knolls Avenue (east and west ends) and at the Dowling Orchards access.

Page 448 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

26  Existing utilities that are in conflict with the above‐mentioned improvements would be relocated.  Easements for the relocated utilities will be acquired during Phase 1.

 Right of way will be acquired for Phase 1 needs only.

 Maintain existing opening in access control to existing parcel located at PM 28.48 on south side of SR‐60.

 Permits from resource agencies and associated costs for mitigation banks for Phase 1 impacts only.

PHASE 2   (See Attachment “T”)

 A Type L‐9 (modified) interchange configuration will be constructed.

 Widen Potrero Boulevard to six (6) lanes (three northbound and three southbound) between the eastbound ramp termini and relocated Western Knolls Avenue intersection.

 Traffic signals will be constructed along Potrero Boulevard at the following locations:

 Eastbound ramps termini (new)
 Westbound ramps termini (new)
 Potrero Boulevard/Western Knolls Avenue (new)

 Widen the existing SR‐60 mainline bridge (San Timoteo Creek Bridge No. 56‐0065) crossing Coopers Creek to the south to accommodate the approach auxiliary lane to the eastbound off‐ramp.

 Construct the eastbound off ramp, eastbound loop on ramp, and eastbound diagonal on ramp.  Ramp metering infrastructure, maintenance pull‐outs, and CHP enforcement areas will be provided on the on ramps.

 Construct the westbound off ramp, westbound loop on ramp, and westbound diagonal on ramp.  Ramp metering infrastructure, maintenance pull‐outs, and California Highway Patrol (CHP) enforcement areas will be provided on the on ramps.

Page 449 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

27  An auxiliary lane will be constructed in advance of the eastbound and westbound off ramps.  The design of the pavement section for the auxiliary lanes will consider these lanes to be future mixed flow lanes.

 Western Knolls Avenue would be realigned from its western terminus to Potrero Boulevard to the existing frontage roadway.  One 12‐ft lane in each direction will be constructed with 8‐ft shoulders.

 Retaining walls will be constructed along the south side of the eastbound off ramp and along the north and south sides of the westbound diagonal on ramp.

 Right of way will be acquired for Phase 2 needs.

 Remove access opening to existing parcel located at PM 28.48 on south side of SR‐60.

 Remove the Western Knolls Avenue and Dowling Orchard access intersections at SR‐60.

 Permits from resource agencies and associated costs for mitigation banks for Phase 2 impacts only.

3) Nonstandard Mandatory and Advisory Design Features

No exceptions to Advisory Design Standards are anticipated.

Caltrans has reviewed and approved the following documents associated with exceptions to Mandatory Design Standards. These exceptions are consistent with current Highway Design Manual standards:

a) A Fact Sheet Exception to Mandatory Design Standards was reviewed and approved by Mr. Ron Nelson, Project Development Coordinator for OPPD on November 28, 1995 (see Attachment “Q”).  Design exceptions that were involved with this approval included a reduction in interchange spacing between the proposed interchange and the I‐ 10/SR‐60 freeway‐to‐freeway junction (2.0 miles to 1.5 miles).

b) A Fact Sheet Exception to Mandatory Design Standards was reviewed and approved by Mr. Luis Betancourt, Design Coordinator, HQ Division of Design on January 12, 2012.  Design exceptions that were involved with this approval included existing nonstandard curve radii and

Page 450 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

28 nonstandard site distances along the SR‐60 mainline between Station 342+90 and Station 393+97.

The following nonstandard design features are identified but are deemed to be outside the construction limits of the project:

c) The ramp from eastbound I‐10 to westbound SR‐60 has a lane convergence of 16:1.  The Highway Design Manual (HDM) advisory design standard calls for a convergence of 50:1.

d) The median width along SR‐60 at the westbound left turn pocket at Jack Rabbit Trail intersection is 9‐ft.  The HDM mandatory design standard calls for a 12‐ft minimum median width for multilane conventional highways in rural areas.

4) Interim Features

Prior to the construction of Phase 1 improvements, the City plans to construct interim improvements, as a separate project, which will include an acceleration/deceleration lane along westbound SR‐60 at the Western Knolls Avenue (West) intersection. The eastern intersection of Western Knolls Avenue at SR‐60 will remain open as it exists today. The interim improvements will allow safer traffic movements at Western Knolls Avenue (West) until both intersections are removed under Phase 2.  Attachment “U” includes an exhibit that depicts the limits of the interim improvements.  A separate environmental clearance will be obtained for the interim improvements. Construction costs for the interim improvements are estimated to be $2.2M.

On October 19, 2011, Caltrans approved a Supplemental Traffic Impact Analysis for Phase 1 that determined anticipated levels of service at existing and proposed intersections at Western Knolls Avenue and at SR‐60.  The results of this analysis indicate that the proposed Phase 1 improvements, in conjunction with the interim improvements, will support future traffic demands.  In addition, these improvements are anticipated to continue to maintain acceptable peak hour operations at the mainline access intersections and along the SR‐60 Freeway until Year 2015 conditions.  Table 5‐1 and Table 5‐2 present the anticipated Levels of Service (LOS) for specific intersection locations and SR‐60 mainline segments respectively.

Intersection LOS deficiencies indicated in Year 2015 and 2025 will be eliminated upon construction of Phase 2 improvements which is scheduled to be completed by 2014.

Page 451 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

29 Table 5.1 – Phase 1 ‐ Intersection Analysis
Intersection Location
Existing 2015 2025
Delay
(Seconds)
Level of
Service
Delay
(Seconds)
Level of
Service
Delay
(Seconds)
Level of
Service

AM PM AM PM AM PM AM PM AM PM AM PM
Potrero Boulevard/
Western Knolls Avenue
Future Intersection 23.7 17.0 C C 1123.3 644.4 F F
Western Knolls Avenue
(West) / Western Knolls
Avenue

8.5 8.5 A A 11.0 10.8 B B 31.3 24.7 D C
Western Knolls Avenue
(West) / SR‐601

12.3 15.0 B B 38.2 60.0 E F 661.1 971.3 F F
Western Knolls Avenue
(East)/Dowling
Orchard/SR‐60

40.3 62.3 E F NA NA NA NA NA NA NA NA
Western Knolls Avenue
(East)/SR‐602
NA NA NA NA 13.0 15.7 B C 16.7 25.0 C C
Dowling Orchard/SR‐602 NA NA NA NA 19.6 22.4 C C 45.3 121.1 E F Source:  Potrero Boulevard at SR‐60 Freeway Interchange, Phase 1 – Focused Traffic Analysis  (September 2011) AM = morning peak hour      PM = evening peak hour    NA = Not Applicable

1. Existing right‐in/right‐out traffic movements from SR‐60

2. Proposed right‐in/right‐out traffic movements from SR‐60

Page 452 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

30 Table 5.2 – Phase 1 ‐ SR‐60 Mainline Segment Analysis Mainline Segment
Existing 2015 2025
Density
(pc/mi/ln)
Level of
Service
Density
(pc/mi/ln)
Level of
Service
Density
(pc/mi/ln)
Level of
Service
AM PM AM PM AM PM AM PM AM PM AM PM
We
s
t
b
o
u
n
d

West of Western
Knolls Avenue (West) 10.6 15.1 A B 14.8 19.0 B C 23.0 29.3 C D Western Knolls
Avenue (West) to
Dowling Orchard

10.5 15.0 A B 11.9 17.1 B B 17.0 24.3 B C
East of Dowling
Orchard/Western
Knolls Avenue

10.6 15.1 A B 12.1 17.2 B B 17.2 24.5 B C
Ea
s
t
b
o
u
n
d

West of Western
Knolls Avenue (West)
to Dowling Orchard

13.0 12.3 B B 16.4 17.2 B B 21.1 24.1 C C
East of Dowling
Orchard/Western
Knolls Avenue

13.0 12.3 B B 15.1 14.3 B B 18.5 17.7 C B
Source:  Potrero Boulevard at SR‐60 Freeway Interchange, Phase 1 –Focused Traffic Analysis  (September 2011) AM = morning peak hour      PM = evening peak hour     pc/mi/ln = passenger car/mile/lane

Page 453 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

31 5) High Occupancy Vehicle (HOV) Bus and Carpool Lanes

HOV lanes are not being constructed as part of the project.  HOV bypass lanes will be provided on the eastbound diagonal and loop on ramps; and on the westbound diagonal and loop on ramps.  The provision for HOV bypass lanes for these ramps is consistent with the “Route Concept Fact Sheet for State Route 60”, dated August 1999 as prepared by Caltrans.

6) Ramp Metering

Traffic operating system infrastructure for ramp metering will be installed at each on ramp by the project.

7) CHP Enforcement Areas

CHP enforcement areas will be included on each on ramp.

8) Park and Ride Facilities

Coordination with the District Park and Ride Coordinator indicates that there are no requirements for providing park and ride facilities for this project.

9) Utility and Other Owner Involvement

Utilities within the project area are owned and operated by the following purveyors:

 Southern California Edison (overhead and underground electric);  Questar Gas Company (underground gas);
 Southern California Gas (underground gas);
 Level 3 Communication (fiber optics);
 Verizon (telephone), and
 City of Beaumont (sanitary sewer).

Attachment “S” and Attachment “T” depicts the preliminary relocation of existing utilities within the project area according to records received from the utility purveyors for Phase 1 and Phase 2 respectively.

Page 454 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

32 Southern California Edison has overhead electric lines located parallel, to the south side of SR‐60 from Station (STA) 350+00 to 372+50 and along the north side of SR‐ 60 from STA 357+20 to 423+00 (A‐Line).  There are perpendicular crossings at STA 357+00, 370+50, 372+50, 395+80 (A‐Line), and STA 419+90 (NR‐Line). Relocation of portions of these overhead electric lines will be required to avoid conflicts with the proposed improvements or to place them outside the future State right of way.  An overhead electric line crossing SR‐60 at STA 395+80 (A‐Line) will be removed to avoid direct conflict with the proposed overcrossing.  The electric lines crossing at STA 370+50 and 372+50 (A‐Line) will be combined and relocated.

Southern California Gas Company has a 4‐inch distribution gas line running parallel to the entire length of Western Knolls Avenue and it eventually crosses SR‐60 at STA 322+00 (NR‐Line).  Relocation of this utility is not anticipated at this time.

Questar Gas Company has a 16‐inch transmission gas line that crosses Potrero Boulevard at STA 476+60 (P‐Line) and the proposed Western Knolls Avenue realignment at STA 11+20 and STA 14+40 (WK‐Line).  This utility also crosses the westbound off‐ramp at STA 407+20 (WB1 Line); SR‐60 at STA 407+70 (A‐Line); and the eastbound on‐ramp at STA 408+05 (EB2 ‐ Line).

Beaumont‐Cherry Valley Water District has planned two future 24‐inch potable water lines and one 24‐inch reclaimed water line located along Potrero Boulevard north of SR‐60.  No water pipelines exist at the interchange location today.  The City of Beaumont is working with future developments located north and south of SR‐60 to bring water pipelines to the interchange area. A temporary well station may be required at the interchange location to provide irrigation water for proposed landscaping.

The City of Beaumont has an abandoned sanitary sewer pump station located on the north side of SR‐60 at STA 468+50 (P‐Line).  This abandoned sewer pump station will be removed to avoid conflict with the proposed northern abutment of the Potrero Boulevard overcrossing.  In addition, conflicting portions of abandoned 12‐inch and 24‐inch sanitary sewer pipelines located in the northeast quadrant of the interchange will be removed to avoid conflicts with proposed drainage improvements.

The City of Beaumont has a sewer force main that lies within the proposed right of way.  This sewer force main will be relocated to be parallel to the westbound off‐ ramp and outside the proposed State right of way.

Page 455 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

33 10) Railroad Involvement

There is no railroad involvement in this project.

11) Highway Planting

Existing vegetation will be removed as part of the project.  The impacted area of existing vegetation is 30.11 acres.  A separate contract for new highway planting will follow the road construction project.  Attachment “J” includes a conceptual plan for landscaping improvements at the project site.  A budget for highway planting and irrigation is included in the project cost estimate.

12) Erosion Control

Each stage of construction will include temporary erosion control measures.

Permanent erosion control measures will be included where appropriate.  A Storm Water Pollution Prevention Plan (SWPPP) will be required prior to construction operations.  A Storm Water Data Report (SWDR) has been prepared for the project.

Attachment “M” includes the approved title page of the SWDR.

13) Noise Barriers

Noise analyses conducted for the project indicate that the closest and only sensitive noise receptor in the project vicinity is located more than 1,500 feet from the proposed interchange.  Due to this distance, no impacts are anticipated at the sensitive receptor, therefore, no sound walls are proposed.

Based on the above, a Noise Abatement Decision Report (NADR) is not required for the project.

14) Non‐Motorized and Pedestrian Features

The project provides for pedestrian access along the west and east sides of Potrero Boulevard using a 6‐ft wide sidewalk. Curb ramps will be provided at the ramp termini using State standards.  Curb ramps at intersections outside State right of way will use City standards.  All ramps will be designed in accordance with the provisions of the Americans with Disabilities Act (ADA). City standard 10‐ft wide shoulders along both sides of Potrero Boulevard will be available for bicycle traffic.

Lighting standards, electrical cabinets, fire hydrants, signs and other fixed objects will be located beyond the back of sidewalk to provide an unobstructed area for

Page 456 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

34 pedestrians. Type “D” detector loops will be installed at new traffic signals to detect bicycles and motorcycles to meet the requirements of Assembly Bill 1581.

Pedestrian signals will be provided at the eastbound and westbound on‐ramps to allow pedestrians to cross these two‐lane ramps more safely.

15) Retaining Walls and Bridge Structures

Retaining walls and bridge railings constructed for the project will receive aesthetic surface treatments to soften their appearance with respect to the surrounding environment.  Attachment “K” presents draft aesthetic treatments for the proposed Potrero Boulevard bridge overcrossing structure at SR‐60.

16) Life Cycle Cost Analysis

A Materials Report (MR) was approved by Caltrans on December 12, 2011.  A Life Cycle Cost Analysis (LCCA) was prepared for the project to determine the optimum pavement design section that will lower life‐cycle cost for the project.  New ramps and auxiliary lanes were considered in the analysis. Traffic Indices (TI) for the SR‐60 mainline (based on an opening year of 2015) were approved by Mr. Gary Green, Office Chief, Office of Forecasting on August 2, 2011 and are shown in Table 5.3.

Table 5.3 – Traffic Indices
Traffic Index Year
Mainline
(including 2‐ft of
adjacent shoulder)
Shoulder
20‐year 16.50 10.50
20‐year ESAL 179,497,432 3,589,949
40‐year 18.50 12.00
40‐year ESAL 474,543,323 9,490,866

The LCCA was approved by Caltrans in March 2012. The following preliminary pavement sections for mainline auxiliary lanes and ramps were approved for the project:

Mainline Auxiliary Lanes: 1.3’ JPCP/0.1’ Bond/0.5’ LCB/0.7’ AS Ramps:   0.95’ JPCP/1.3’ AB

Page 457 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

35 Auxiliary lanes pavement sections at the westbound and eastbound off‐ramps will be designed based on the 40‐year TI values shown in the preceding table.  Ramp pavement sections will be designed in accordance with Table 613.5A from the Highway Design Manual (2006).  Preliminary pavement sections have been developed to establish project budgets for the project (see Attachment “P”).

However, final pavement section designs will be determined during the final design phase.

17) Needed Structure Rehabilitation and Upgrading
Widening of the existing San Timoteo Creek (Bridge No. 56‐0065) structure crossing Coopers Creek is included in the project.  In addition to the widening, the Type 1 curb and railing on the westbound side of this structure will be removed and upgraded with a Type 732 concrete barrier.

There are no other existing bridge structures requiring rehabilitation or upgrading.

Attachment “L” includes an approved Advanced Planning Study for the project bridge structures.

18) Cost Estimates

The total project and construction cost (in 2011 dollars), including the costs of right of way, utility relocations, environmental mitigation, capital outlay support, and mid‐year escalation costs for the project is presented in Table 5.4.  Refer to Attachment “P” for a more detailed breakdown of Phase 1 and Phase 2 costs.

Table 5.4 – Preliminary Project Cost Summary
Items Phase 1 Phase 2
Roadway $9,000,000 $33,400,000
Structure $8,600,000 $810,000
Right‐of‐Way / Utilities $500,000 $6,400,000
Escalation (Phase 2 to 2014) $ 0 $3,290,000
Subtotal $18,100,000 $43,900,000
Capital Outlay Support $4,400,000 $9,000,000
Environmental Mitigation $500,000 1,500,000
Totals $23,000,000 $54,400,000

Page 458 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

36 19) Right of Way Data

Right of way cost estimates, including utility relocation costs, are discussed within Section 5(A) (18) of this report.  Sections 5(A) (9) and 5(A) (10) provide more information regarding utility relocations and railroad involvement.  Right of way data sheets for the project are included in Attachment “O” and additional discussion is provided in Section 6(D), “Right of Way” herein.

B. Rejected Alternatives
The following alternatives were rejected from further consideration.  Specific reasons for rejecting these alternatives are discussed in as follows:

 Jack Rabbit Trail/SR‐60 Interchange ‐ Providing a full access interchange at this location instead of the proposed location was considered during the alternative screening process. However, since an interchange was not included in the City’s General Plan Circulation Element or regional transportation plans governed by SCAG, RCTC, or WRCOG at this location, it was eliminated from further consideration.

 Potrero Boulevard/SR‐60 Interchange ‐ Spread Diamond Configuration – Providing a spread diamond configuration was rejected for the following reasons:

a) The spread diamond configuration presents a larger overall footprint in the northwest and southeast quadrants of the proposed interchange as compared to a partial cloverleaf configuration.  As a result, larger right of way impacts to approved residential and commercial developments would occur, as well as, more impacts to the environment.  An additional 3.40 acres and 6.58 acres  would be required respectively for a total of 9.98 acres; and

b) The spread diamond configuration does not operate as efficiently as the partial cloverleaf configuration.  Table 5.5 presents a comparison of intersection level of service at the proposed ramp termini for each configuration.  The partial cloverleaf will provide superior levels of service as compared to the spread diamond configuration.

Page 459 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

37 Table 5.5 – Partial Cloverleaf vs. Spread Diamond Configuration Intersection Operations Comparison
Intersection
2035
Partial Cloverleaf
Level of Service
2035
Spread Diamond
Level of Service
Peak Hour Peak Hour
AM PM AM PM
Potrero Blvd and WB Ramps B B C C
Potrero Blvd and EB Ramps A B C D

6. CONSIDERATIONS REQUIRING DISCUSSION
A. Hazardous Waste
Lead‐contaminated soil will be managed in compliance with DTSC Variance V09HQSCD006.  An aerial deposited lead (ADL) site investigation of the exposed soil adjacent to the SR‐60 westbound and eastbound shoulders was performed within the project limits.  Results of the tested soils indicate the following:

Excavation
Depth
STLC (mg/l)
TTLC (mg/kg)
DI WET (mg/l)
Soil Type Handling
0 to 1 foot
> 5.0

1.5 feet
< 5.0
<1000
n/a
X
Non‐hazardous waste suitable for on‐
site reuse ‐ Notify and require Lead
Compliance Plan for worker safety
Soils within the parcels to be acquired for the project will be tested for pesticides and herbicides during the design phase and submitted to Caltrans for review and concurrence.  Handling and disposal of the soils containing pesticides and herbicides will be included in the project specifications.

Page 460 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

38 B. Value Analysis
A Value Analysis (VA) Study was conducted by Caltrans and facilitated by Value Management Strategies, Inc. for the project during September 23, 24, 29, and 30, 2009.

A Preliminary Value Analysis Study Report was presented by the VA Team on October 1, 2009.  The VA team developed fifteen (15) alternatives for improvement of the project.

Table 6.1 presents the VAS alternatives. A VA Implementation meeting was held on December 10, 2009 to discuss the alternatives and to determine which ones would be incorporated into the project.  After much discussion, the meeting participants rejected all of the alternatives noting that they would not meet Caltrans’ 20‐year design policy and design standards for Potrero Boulevard established by the City of Beaumont.

Table 6.1 – Value Analysis (VA) Study Alternatives
Alt No. Alternative Description

1.1 Reduce Potrero Blvd Bridge width to 80‐ft

1.2 Build the 6‐lane Potrero Blvd Bridge, but consider only an 8‐Lane SR 60; Modify abutment and shorten bridge span to 288‐ft

1.3 Reduce Potrero Blvd Bridge width to 96‐ft and reduce bridge span to 288‐ft

1.4 Reduce Potrero Blvd Bridge width to 96‐ft

1.5 Reduce two 14‐ft inside lanes to 12‐ft; Total width is 120‐ft

1.6 Reduce Potrero Blvd Bridge width to 74.75‐ft

2.0 Use Precast Beams on the Full As‐Planned Project; Use Bulb‐T or I Girder

3.0 Reduce the 10‐ft outside shoulders on the Potrero Blvd Bridge to 8‐ft

4.0 Reduce 14‐ft median to 2‐ft for striping; Reduce width from 124‐ft to 112‐ft

5.1 Construct single‐lane westbound off‐ramp; Eliminate auxiliary lane

5.2 Construct single‐lane westbound off‐ramp; Reduce terminal section from four to three lanes (Two Left Turn, One Right Turn)

6.0 Eliminate the eastbound loop ramp; Modify the eastbound slip on‐ramp

7.0 Modify eastbound off‐ramp terminal section to two left‐turn lanes and one right‐turn lane

8.0 Narrow all Potrero Boulevard lanes to two lanes in each direction

9.0 Eliminate Coopers Creek Bridge widening; Eliminate auxiliary Lane from Station 349 to Station 365 (1,600 Feet)

Page 461 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

39 C. Resource Conservation
Measures that will be taken to conserve energy and nonrenewable resources for the project are as follows:

1. Stage construction of the project will be planned and scheduled to minimize impacts to existing traffic flows along SR‐60.  It is anticipated that separate eastbound and westbound mainline closures along SR‐60 will be done at night to erect falsework for the Potrero overcrossing structure during Phase 1.  Detouring of mainline traffic during Phase 2 will not be required.

2. Construction activities will be planned and scheduled to maximize the efficient use of construction manpower and equipment to reduce the use of fuel and power consumption.

3. Proposed traffic signal systems will be interconnected to move traffic through the new interchange and local streets efficiently.

4. Existing pavement sections along Western Knolls Avenue will be rehabilitated to minimize removals.

5. Existing pavement sections to be removed may be recycled and incorporated into the new pavement sections.

D. Right of Way Issues
1) Right‐of‐Way Required

Right of way for the proposed interchange footprint will be obtained as part of Phase

1.  Property to be acquired south and north of SR‐60 generally consists of vacant lands.  Table 6.2 presents the parcels affected by the project and estimated areas of acquisitions:

Table 6.2 – Anticipated Right‐of‐Way Needs
Build
Alternative
Parcels
Affected
Approximate
Area (acres)
Number of
Partial Takes
Number of
Full Takes
1 7 29.37 7 0

Page 462 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

40 Table 6.3 presents a preliminary breakdown of the parcels that will affected, property owner name, parcel location, and approximate areas of acquisitions for the project.

The properties required for the project are generally unimproved.  The designated property uses include residential, agricultural and commercial.  The right of way requirements will impact seven (7) privately owned larger parcels and one (1) governmental entity ownership.

Table 6.3 – Preliminary Right of Way Acquisitions
Assessor Parcel
Number (APN) Property Owner
Parcel
Location
Approximate Area of
Acquisition
414‐110‐010 City of Beaumont South of SR‐60 2.41 acres
421‐020‐001 Private South of SR‐60 0.49 acres
421‐020‐006 Private South of SR‐60 0.72 acres
421‐020‐008 Private South of SR‐60 1.53 acres
421‐020‐003 Private South of SR‐60 12.30 acres
421‐060‐003 Private South of SR‐60 6.92 acres
414‐120‐022 Private North of SR‐60 5.00 acres
Totals     29.37 acres

The identified rights to be acquired include fee simple and abutter’s rights.   Abutters’ rights previously acquired will be reestablished along new mainline right of way.

Abutters (access rights) will be acquired to close the existing at grade intersections at Western Knolls Avenue.  The parcels on the north will have access via the new interchange and the extension of Western Knolls Avenue. The parcels to the south will likely suffer from some severance damages and loss of business goodwill due to location and orientation of the agricultural related commercial building.  Legal access appears to be available from the south via local roads.  No excess land is anticipated as a result of the acquisitions.  No mitigation acquisition is anticipated.

Page 463 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

41 Existing openings in access control north and south of SR‐60 will be removed and replaced with State access control at the following locations (See Attachment “E”):
 Location 1 (PM 28.48) is a 20‐ft opening in access control that allows ingress and egress to private lands and an existing cell tower site south of SR‐60.  This access will remain in place under Phase 1.  This access will be closed prior to the opening of Phase 2.

 Location 2 (PM 29.40) is a 30‐ft opening in access control that allows ingress and egress to private land located south of SR‐60.  This access will be closed under Phase 2.

 Location 3 (PM 29.40) is an existing at‐grade intersection with Western Knolls Avenue (WKA), a 2‐lane frontage road located along the north side of SR‐60.

Right‐in and right‐out movements are currently allowed.  This access will be closed under Phase 2.

 Location 4 (PM 29.93) is an existing at‐grade intersection with the same WKA frontage road at its eastern end.  During Phase 1, a concrete median barrier will be constructed across this intersection.  Right‐in/right‐out movements into WKA on the north and to the Dowling Orchard parcel on the south will be maintained.

Complete closure of the access will be made under Phase 2.

2) Relocation Impact Studies

No relocations of existing homes or businesses are involved in the project.

3) Airspace Lease Areas

No airspace lease areas are involved in the project.

4) Utility and Other Owner Involvement

Southern California Edison (SCE) will be involved to coordinate the relocation of existing overhead electrical lines along the south side of SR‐60 from Station (STA) 357+00 to 370+50 (A‐Line) and along the north side of SR‐60 from STA 357+25 to 411+50 (A‐Line).  New easements will be obtained to accommodate the relocated overhead electrical lines.

Page 464 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

42 A 50‐foot longitudinal easement owned by the Metropolitan Water District (MWD) exists from STA 355+00 to 369+50 (A‐Line) according to land records.  Currently, there are no improvements within this easement.  Coordination with MWD will be performed to have this easement relinquished within State right of way.

5) Railroad Involvement

No railroads are involved with the project.

E. Environmental Issues
A Final Environmental Document (FED) was approved on March 1, 2013.  The finding of the Initial Study supports a Mitigated Negative Declaration (MND) under CEQA.  A Finding of No Significant Impact (FONSI) was issued on March 1, 2013, under NEPA.

Attachment “V” includes the FED and FONSI.  A summary of the findings of the FED are as follows:

Traffic and Transportation – the project may have short‐term impacts to traffic due to project construction.  Measures to address impacts during construction include the preparation of a Traffic Management Plan (TMP) that will include orderly stage construction, advance warning signage, public information and outreach, CHP enforcement, and changeable message signs along the freeway mainline.

Visual/Aesthetics – The visual impacts of the project can be summarized by saying that the semi‐rural character of the SR‐60 corridor within the project limits would become noticeably more suburban.  Generally, this change would affect SR‐60 users more than it would those who view the mainline from adjacent developments.  This change would not be significant enough to impact visual elements in both short‐range and long‐range views from SR‐60.  Measures will include implementing the improvements shown on the landscape concept plan (See Attachment “J”) that utilizes native plant varieties that are representative of the vegetation communities within the project area. Removal of existing trees within State right‐of‐way will be replaced at a 3:1 ratio.  A separate contract for new highway planting will follow the road construction project.  Additionally, aesthetic treatments to the surfaces of proposed retaining walls and the overcrossing bridge structure at Potrero Boulevard shall be incorporated into the project (See Attachment “K”).  Nighttime light and glare shall be directed away or shielded from sensitive uses.

Cultural Resources – no cultural, archaeological, or paleontological resources were found within the project area limits; therefore Caltrans deemed a finding of no impact appropriate.  Conservation measures include monitoring and specific requirements in the event such resources are encountered during construction.

Page 465 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

43 Cultural Resources – no cultural, archaeological, or paleontological resources were found within the project area limits; therefore Caltrans deemed a finding of no impact appropriate.  Conservation measures include monitoring and specific requirements in the event such resources are encountered during construction.

Hazardous Waste/Materials – Aerial Deposited Lead (ADL) is anticipated just outside and along SR‐60.  Lead levels above State and federal regulatory standards may be exceeded requiring special handling and disposal requirements associated with hazardous waste during construction. Lead‐contaminated soil found within the State right‐of‐way shall be managed in accordance with DTSC Variance V09HQSCD006.  Testing for pesticides and herbicides will be performed prior to the completion of design.

Air Quality – construction dust control will be subject to feasible practices identified by the South Coast Air Quality Management District (SCAQMD) Dust Rule 403 in addition to other requirements specified in Section 7.102C “Emissions Reductions”, Section 14‐9 “Air Quality”, and Section 18 “Dust Palliative” of Caltrans’ Standard Specifications.

Biological Environment – the project may potentially have adverse impacts to natural communities; wetlands and other waters, and certain non‐listed special status species within the biological study areas described in the Natural Environment Study technical report.

Measures have been developed to avoid and minimize impacts to Southern Cottonwood‐ Willow Riparian Forest, Riversidean Sage Scrub, and Coast Live Oak Woodland.

Impacts to the least Bell’s vireo (LBV), a federally and state endangered bird species, and associated riparian/riverine areas cannot be avoided. Conservation measures include purchasing credits in the Santa Ana River Wetlands Mitigation Bank through the Riverside County Park and Open Space District; implementing BMPs resulting from storm waters; and adhering to the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP).  Other requirements are specified in the FED for addressing burrowing owls, migratory birds, Stephen’s kangaroo rat (SKR), and bat species. Review by the California Department of Fish and Game (CDFG) and the United States Fish and Wildlife Service (USFWS) occurred on March 18, 2010 to demonstrate project consistency with the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP).

Invasive plant species may potentially be introduced to the project area during construction.  Measures to combat invasive species generally include:

 Landscaping bare soil with locally adopted seed mixtures to preclude the invasion of noxious weeds;

Page 466 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

44  Landscaping bare soil with locally adopted seed mixtures to preclude the invasion of noxious weeds;
 Cleaning of construction equipment to remove mud and other debris that may contain invasive plants and/or seeds;
 Covering of trucks carrying vegetation that is to be removed from the site; and  Disposal of said vegetation in accordance with applicable laws and regulations.

On April 22, 2010, a formal Section 7 consultation was completed with the USFWS which resulted in the following findings:

 The proposed purchase of credits in a wetland creation program should provide preservation that is biologically equivalent or superior to avoidance of the riparian/riverine habitat on the project site.
 The project is consistent with the Narrow Endemic Plant Species policy of the MSHCP.  The project is consistent with the MSHCP Additional Survey Needs and Procedures policy of the MSHCP for the burrowing owl.
 Implementation of the project will not result in jeopardy to the least Bell’s Vireo (LBV) or Stephen’s Kangaroo Rat (SKR).

The USFWS and CDFG concurred with proposed compensatory efforts to offset the loss of 2.053‐acres of State streambeds and 0.104‐acres of riparian habitat.  In addition, the project will result in the loss of 0.0075‐acres of wetlands.  The project proposes to purchase credits equivalent to 0.3345‐acres, in the form of habitat creation, from the Santa Ana Watershed Authority or the Riverside‐Corona Resource Conservation District at a 3:1 ratio for riparian and wetlands.

For impacts to streambed and non‐wetlands waters, credits will be purchased equivalent to 4.106‐acres in the form of habitat enhancement, habitat creation, or a combination of the two at a 2:1 ratio.  The proposed purchase of 4.4405‐acres of credits in a wetland creation program should provide preservation that is biologically equivalent or superior to avoidance of the riparian/riverine habitat on the project site.

Water Quality ‐ the project will comply with Caltrans’ Statewide NPDES permit and a Storm Water Data Report (SWDR).  A SWDR has been prepared for the project which summarizes the actions that will be taken to comply with the aforementioned permit.

Attachment “M” includes a copy of the approval page of the SWDR.

F. Air Quality Conformity
The project is identified in the Southern California Association of Governments (SCAG) 2012‐2035 Regional Transportation Plan/Sustainable Communities (RTP/SCS). On April 4,

Page 467 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

45 2012‐2035 RTP/SCS and the 2010/2011 Federal Transportation Improvement Plan (FTIP) (thru Amendment 11‐24) to conform to the applicable State Improvement Plan (SIP). The design concept and scope of the project is consistent with the project description in the RTP/SCS (ID# RIV 050535).

An Air Quality Conformity Analysis for the project was submitted to FHWA on September 27, 2012.  On October 18, 2012, FHWA issued a determination that the project was in conformance.

G. Title VI Considerations
Caltrans and FHWA policies demonstrate commitment to Title VI of the Civil Rights Act requirements that no person be excluded from or denied the benefits of or discriminated by any Federal activity because of race, color, religion, national origin, gender, age or handicap.  Implementation of this project is compliant with these policies and Executive Order 12898, “Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations.”

The project’s partial cloverleaf configuration (Type L‐9) does not impact Title VI requirements in regards to the mobility of low income and minority populations.  The project will provide for equivalent access to this facility that will address current American with Disabilities Act (ADA) requirements by providing provisions for cross slopes, ramps, sidewalk widths, and obstruction conflict avoidance for pedestrian pathways.  Details of the pedestrian facilities and their relationship to the project as a whole will be clearly depicted and submitted as described in Design Information Bulletin (DIB) 82‐04.

H. Noise Abatement Decision Report
Noise studies prepared for the project indicate that the closest and only sensitive noise receptor in the project vicinity is located more than 1,500 feet from the proposed interchange.  Due to this distance no impacts are anticipated at the sensitive receptor and no sound walls or other sound attenuation are proposed for the project.  Therefore, a Noise Abatement Decision Report is not required for this project.

7. OTHER CONSIDERATIONS AS APPROPRIATE

A. Public Hearing Process
A public information meeting was held at Beaumont City Hall as part of the environmental review process.  Comments received from the public at this meeting were documented and considered in preparation of the Final Environmental Document (FED) and Final Project Report (FPR).

Page 468 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

46 documented and considered in preparation of the Final Environmental Document (FED) and Final Project Report (FPR).

B. Permits
The following permits are anticipated for the project:

1. Section 404 Permit from the U.S. Army Corp of Engineers (USACE)

2. 1602 Streambed Alteration Agreement from the California Department of Fish and Game (CDFG).

3. Section 401 Water Quality Certification from the Santa Ana Regional Water Quality Control Board (RWQCB).

4. This project must conform to the requirements of Caltrans’ Statewide National Pollutant Discharge Elimination System (NPDES) Storm Water Permit, Order No. 99‐ 06‐DWQ, NPDES No. CAS000003 in addition to the responsibilities specific in Caltrans’ Statewide Storm Water Management Plan (SWMP). The project must also conform to the requirements of the General NPDES Permit for Construction Activities, Order No. 2009‐0009 DWQ, NPDES No. CAS000002, and any subsequent General Permit in effect at the time of project activity.

C. Cooperative Agreements
A Project Development Cooperative Agreement (No. 8‐1334) between the State and the City of Beaumont was approved on February 28, 2008.  See Attachment “R” to review the conditions of the agreement.

On September 27, 2011 Caltrans delegated authority to the City to advertise, award, and administer (AAA) the construction phase of Phase 1 and Phase 2. Construction Cooperative Agreements between the State and City were approved on January 26, 2012 (Phase 1) and March 12, 2012 (Phase 2).   See Attachment “R” to review the conditions of the agreements.

D. Other Agreements
California Transportation Commission (CTC) consent is required for public road openings or connections with freeways.  Sections 23.5, 100.2, and 100.3 of the Streets and Highway Code authorize Caltrans to enter into Freeway Agreements providing for the closing of city streets, county highways or county roads.  Freeway agreements must show CTC approved new connection of new city streets or new county highways and roads.

A Freeway Agreement was executed between the State of California Department of Public Works, Division of Highways and the County of Riverside on July 2, 1956.  This agreement will be superseded in part by a new freeway agreement between the State

Page 469 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

47 and the City of Beaumont.  Portions of the previous agreement not within the City Limits will remain in effect.

A Freeway Maintenance Agreement will be required.  The proposed roadway and traffic signal systems at the interchange ramps will be owned operated and maintained by the State after construction.  Maintenance costs will be shared between the City and State in accordance with Caltrans established policies.  This agreement will be developed during the design phase and will be addressed in the Cooperative Agreement for the construction phase.

The City will be required to cover costs and responsibilities associated with environmental mitigations for the project.  The City will also be responsible for the installation of planting and irrigation of all landscaped areas within State right of way.

The responsibilities of maintenance and monitoring costs of said landscaping will be determined during the PS&E phase of the project and will be included in the new Freeway Maintenance Agreement.

E. Transportation Management Plan for Use During Construction A Transportation Management Plan (TMP) will be required to minimize delay and inconvenience to the public during construction.  The TMP shall be developed concurrently with the development of the project plans.  The TMP Guidelines, revised May 2004, shall be utilized in the preparation of the plan.  Anticipated TMP elements that will be included are:
 Provide orderly construction sequences as a requirement of the contract plans.  Provide changeable message signs, advanced warning, and guide signs.  Provide or maintain an equal number of traffic lanes and storages during construction.
 Provide information on daily construction activities to local media to advise motorists of changes to traffic patterns during construction.
 Provide toll‐free numbers to commuters for information and to log complaints if deemed necessary.
 Prohibit the Contractor from closing, or working in or adjacent to traffic lanes during heavy recreational seasons and access to funeral processions.  The City will initiate and administer the COZEEP service agreement with the CHP and local police during construction of the project whenever daytime or nighttime temporary lane closures, and freeway closures are to be implemented.

Delays to existing traffic along SR‐60 due to the construction of the proposed improvements are anticipated.  Full night time closures of the SR‐60 mainline will be

Page 470 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

48 required for erection of bridge falsework under Phase 1.  Temporary reductions in lane widths along SR‐60 within the project limits will be required to provide adequate space for the construction of the proposed auxiliary lanes, bridge median columns, bridge falsework, and median barriers.  Temporary K‐rail with traffic screens will be installed to protect construction workers and to minimize visual distractions. Temporary closure of Potrero Boulevard (north of SR‐60) will also be required during Phase 1 to allow for connections to new bridge construction.

Special attention will be given to developing traffic plans to safely handle mainline traffic during the construction of bridge median columns and falsework crossing SR‐60 during Phase 1.

Appropriate advanced warning and detour signage shall be installed on Potrero Boulevard and Western Knolls Avenue to inform the public of any detours during the construction phase. A public outreach/community liaison program will be established by the City of Beaumont before construction starts to provide a point of contact with businesses and neighborhoods that will be affected by the project.  The following programs being considered are as follows:
 A media communication plan will be developed to update public with information regarding the construction phases of the project.
 Temporary signs will be installed notifying the public of closures, detours and the duration of the closure.
 Providing alternate access points to businesses to minimize temporary disruption through coordination with construction.
 Providing at least one open driveway to all businesses during construction.

There will be coordination among the project construction team with the California Highway Patrol, City Police and Fire Department, County Sheriff Department, County Fire Districts, and local public and private ambulance and paramedic providers in the area to prepare a construction period emergency access plan prior to the start of construction.

A Transportation Management Plan Data Sheet is included in Attachment “N”, which identifies preliminary TMP elements and estimated costs.

F. Stage Construction
It is anticipated that the project will be constructed in two (2) primary stages for Phase 1 and Phase 2 as follows:

PHASE 1 ‐ Stage 1
 Relocate interfering overhead and underground utilities.  Construct mainline pavement widening along the outside edges of eastbound and

Page 471 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

49 westbound SR‐60 to accommodate median construction of bridge pier columns and falsework.
 Construct embankments north and south of SR‐60 for roadway rough grade and bridge abutment construction.
 Construct concrete median and pavement across Western Knolls Avenue eastern intersection and MBGR to the existing bridge structure. Access to SR‐60 restricted to right‐in/right‐out movements at the east Western Knolls Avenue intersection during this phase.

PHASE 1 ‐ Stage 2
 Move eastbound and westbound traffic to the outside of SR‐60 to allow room in the median area to construct pier foundations and columns.  Install bridge falsework.  Implement separate mainline closures in westbound and eastbound directions to accommodate erection of falsework across SR‐60.  This would most likely occur during the night and on weekends as required to minimize disruption to SR‐60 traffic.
 Construct 6‐lane bridge superstructure and roadway pavement.  Complete installation of pavement striping and signing.

PHASE 2 ‐ Stage 1
 Relocate interfering utilities.
 Widen SR‐60 bridge structure (San Timoteo Creek Bridge No. 56‐0065) to the south along eastbound SR‐60.
 Construct Potrero Boulevard, westbound and eastbound ramps, and auxiliary lanes along eastbound and westbound SR‐60.
 Construct Western Knolls Avenue realignment to Potrero Boulevard.

PHASE 2 ‐ Stage 2
 Demolish existing access openings and intersections.  Finalize roadway construction to SR‐60 at these locations. Complete installation of pavement striping and signing.

G. Accommodation of Oversize Loads
This project will not restrict the movement of oversized loads through the area.

Page 472 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

50 H. Graffiti Control
This project does not propose any unique design to prohibit or deter graffiti.  Vine plantings could be installed where space allows along the wall to reduce the potential for graffiti on retaining walls.  Responsible parties involved in preventing and removing graffiti will be addressed in the Freeway Maintenance Agreement.

8. PROGRAMMING
Table 8.1 presents the funding resources for the project. Table 8.2 presents the project milestone schedule.

Table 8.1 – Funding Resources
Fund Type Fund Amount
Local Funds $ 71,895,000
Demo‐SAFETEA‐LU $1,440,000
Surface Transportation Program  $990,000
FFY 2010 Appropriations Earmarks $750,000
FFY 2009 Appropriation Earmarks  $855,000
FFY 2008 Appropriation Earmarks  $1,470,000
TOTAL $77,400,000

Page 473 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

51 9. REVIEWS
SR‐60/Potrero Boulevard Traffic Impact Analysis, prepared by Urban Crossroads, dated March 2010, was reviewed and approved by District Traffic Forecasting and Highway Operations in March 2010. Geometric Approval Drawings (GAD) for the project were reviewed and concurred with by Manuel Jabson III– Traffic Surveillance Region A on August 19, 2009 and by Brian K. Frazer – Headquarters Geometric Reviewer on August 20, 2009.  The GAD was approved by Anthony Ng – Office Chief, Design J on August 20, 2009.

10. PROJECT PERSONNEL
Table 10.1 identifies the people who can be contacted if any questions should arise about this report or the environmental document:

Table 8.2 –Project Milestones
Milestone
Completion Date
Phase 1 Phase 2
PA/ED March 2013 March 2013
Complete Design April 2013 December 2013
Right‐of‐Way Certification April 2013(a) March 2014(a)
Advertise Construction
Contract(b) Spring 2013 Spring 2014
Begin Construction Summer 2013 Summer 2014
Complete Construction Summer 2014 Summer 2015
(a) Assumes dedication of right of way by property owners. (b) Advertisement, Award, and Administration (AAA) delegated to City on 9/27/2011.

Page 474 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

52 Table 10.1  Project Representatives
Representative Name Phone
Caltrans Project Management Jason Bennecke (909) 556‐8852 Caltrans Design Oversight Gideon Agra  (909) 383‐4227
Caltrans Design Oversight Du Lu (909) 383‐6999
Caltrans Environmental Planning Boniface Udotor (909) 888‐2347 Caltrans Environmental Planning Illeen Prentiss (909) 388‐7070 Caltrans HQ Geometric Reviewer Brian K. Frazer/Anthony Ng (909) 275‐2926 City of Beaumont Ernest Egger  (951) 769‐8520
Consultant Project Manager Jimmy Sims, Mark Thomas & Company (408) 453‐5373

11. LIST OF ATTACHMENTS
A. Regional Location Map
B. Vicinity Map
C. City of Beaumont Western Area Projects
D. City of Beaumont General Plan Circulation Element
E. State Route 60 Existing Access Openings and Intersections F. Existing Developed and Undeveloped Lands
G. City General Plan Land Uses Surrounding Project
H. Future Development Projects Within the Vicinity of Project I. Potrero Blvd and SR‐60 – 8‐lane and 10‐lane Section
J. Conceptual Landscape Plan
K. Proposed Bridge Aesthetics
L. Advanced Planning Study
M. Storm Water Drainage Report  (Approval Page Only)
N. Traffic Management Plan Data Sheet
O. Right of Way Data Sheet
P. Preliminary Project Cost Estimates – Phase 1 and 2
Q. Approved Fact Sheets (Approval Page Only) – November 1995 and January 2012 R. Project Development and Construction Agreements
S. Typical Sections, Layout, Profile, Utility Plans – Phase 1 T. Typical Sections, Layout, Profile, Utility Plans – Phase 2 U. Interim Improvements Exhibit
V. Final Environmental Document (under separate cover)

Page 475 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT A

REGIONAL LOCATION MAP

Page 476 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT A

REGIONAL LOCATION MAP

Page 477 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT B

VICINITY MAP

Page 478 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT B

VICINITY MAP

Page 479 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT C

CITY OF BEAUMONT
WESTERN AREA PROJECTS

Page 480 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT C

CITY OF BEAUMONT
WESTERN AREA PROJECTS
New Interchange
Potrero Blvd at SR‐60 –
Phase 1 ‐ 2‐lane Potrero
and 6‐lane bridge
completed by Summer
2014.   Phase 2 – Full
interchange
construction completed
by Summer 2015.

Potrero Blvd – Oak Valley
Parkway to Western Knolls
Avenue (WKA) – Construction
completed
Preliminary Potrero Boulevard
Bypass Alignment.  Currently in
preliminary design. Estimated
construction completed by 2035.

Local Roadway Project –
Potrero Blvd and 4th Street
Extension – 2‐lane
construction completed by
Summer 2014.

Limits of Project
Westbound Acceleration
and Deceleration lane on
SR‐60 mainline at WKA
(West) – Construction
completed by Summer
2013 Not to Scale
City Boundary

Page 481 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT D

CITY OF BEAUMONT
GENERAL PLAN CIRCULATION ELEMENT

Page 482 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

New
Interchang
Enlarged Area
Not to Scale
Not to Scale
ATTACHMENT D

CITY OF BEAUMONT
GENERAL PLAN CIRCULATION

ELEMENT

Page 483 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT E

STATE ROUTE 60
EXISTING ACCESS OPENINGS AND INTERSECTIONS

Page 484 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT E

STATE ROUTE 60
EXISTING ACCESS OPENINGS
AND INTERSECTIONS
PM 28.03
Begin Project
317 feet east of
Jack Rabbit Trail
PM 30.42
End Project
106 feet west of
the I‐10/SR‐60
Junction
Legend
EB = Eastbound
WB = Westbound
PM = Postmile
I/C = Interchange
Project Limits
Location of
Proposed
Interchange
PM 28.91

Page 485 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT F

EXISTING DEVELOPED AND UNDEVELOPED LANDS

Page 486 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT F

EXISTING DEVELOPED AND
UNDEVELOPED LANDS
Not to Scale
Legend
UP Railroad

Page 487 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT G

CITY GENERAL PLAN LAND USES SURROUNDING
THE PROJECT

Page 488 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

PM 28.03
Begin Project
317 feet east of
Jack Rabbit Trail
PM 30.42
End Project
106 feet west of
the I‐10/SR‐60
Junction
New
Interchange
Location
City Boundary
Not to Scale
ATTACHMENT G

CITY GENERAL PLAN
LAND USES
SURROUNDING THE

PROJECT

Page 489 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT H

FUTURE DEVELOPMENTS WITHIN THE VICINITY
OF THE PROJECT

Page 490 of 669 ends

08‐RIV‐60‐PM 28.03/30.42
EA 341400
PN 0800000612
RU 2232
Local Funds 800.100
February 2013

ATTACHMENT H

FUTURE

DEVELOPMENT
PROJECTS IN THE
VICINITY OF THE

PROJECT
Not to Scale
New
Interchange
Location
PM 30.42
End Project
106 feet west of
the I‐10/SR‐60
Junction
City Boundary
PM 28.03
Begin Project
317 feet east of
Jack Rabbit Trail

Page 491 of 669 ends