Cities Index.
Agenda packet, joint meeting

Bell Gardens City Council
February 12, 2024

Document
Agenda packet, joint meeting
Meeting
February 12, 2024
Body
Bell Gardens City Council
Pages
4
Original file
667 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

CITY OF BELL GARDENS

CITY COUNCIL/ SUCCESSOR AGENCY TO THE COMMUNITY

DEVELOPMENT COMMISSION

JOINT MEETING
M O N DAY, F E B RUARY 12, 2024, 6: 00 P M
AGENDA
LOCATION: CITY COUNCIL CHAMBERS, 7100 GARFIELD AVENUE, BELL GARDENS, CA90201 The meeting will be held at Bell Gardens City Hall in the Council Chambers. The public may attend the meeting in -person or virtually as instructed below. You may view the meeting live on the City's website at https://www.bellgardens.org/i-want-to/watch-city-council-meetings .

ACCESSIBILITY: If requested, the agenda and backup materials will be made available in appropriate alternative formats to persons with a disability, as required by Section 202 of the Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132), and the federal rules and regulations adopted in implementation thereof. Any person who requires a disability -related modification or accommodation, in order to observe and/or offer public comment may request such reasonable modification, accommodation, aid, or service by contacting the City Clerk's office by telephone at 562-806-7704 or via email to [email protected] no later than 72-hours before the scheduled meeting.

PUBLIC PARTICIPATION: The members of the public may address the City Council / Agency Members on any item listed on the agenda or on matters which are not listed on the agenda but are within the subject matter jurisdiction of the City Council / Successor Agency. Public comments are limited to three (3) minutes per person for each designated public comment period(s). Public comments for non - agenda items will be limited to a total of 30 minutes. Public comments can be made by any of the following ways:

IN -PERSON: Members of the public can provide in -person comments at the podium in the Council Chamber. The Council Chambers will have seating available for members of the public to attend the meeting in person, subject to capacity limits. Public comments are limited to three (3) minutes for each designated public comment period(s) per speaker, unless a different time is announced by the presiding chair. Speakers who wish to address the City Council / Agency Members should do so by submitting a "Public Comment Card" card by 5:00 p.m. for Closed Session items and by 6:00 p.m. for all other designated public comment periods as listed.

BY TELEPHONE: Phone Number: (669)900-9128 Webinar I D: 813 3236 4343# Passcode: 2021# To address the City Council press *9 to raise your hand then *6 to unmute yourself when instructed.

VIRTUALLY LIVE: Members of the public may participate via Zoom by https://zoom.us/join and entering the Zoom Meeting I D: 813 3236 4343 Passcode: 2021
Comments may also be made via the Zoom app by using the "Raise Hand" feature when it is your turn to speak the host will unmute you. Comments will not be accepted in the QandA Chat function of the zoom app.

WRITTEN COMMENTS: Public comments may be emailed to [email protected] or mailed to: City Clerk's Office, 7100 Garfield Ave., Bell Gardens, CA 90201. To ensure distribution to the members of the City Council /Agency Members prior to consideration of the agenda, please submit 1 comments no later than one (1) hour prior to the meeting. Those comments, as well as any comments received after, will be distributed to the members of the City Council / Successor Agency and will be part of the official public record of this meeting.

For more information, you may contact the City Clerk's office during regular business hours 7:30 a.m. to 6:00 p.m., Monday through Thursday at (562) 806-7704.

PUBLIC HEARING: Public participation will be separately called for the public to provide comments at the time of each public hearing item. Speakers who wish to provide a comment should do so by submitting a "Public Comment Card" to the staff liaison, clerk, prior to the designated public comment period.

CALL TO ORDER

INVOCATION

PLEDGE OF ALLEGIANCE

ROLL CALL OF CITY COUNCIL MEMBERS / SUCCESSOR AGENCY TO THE COMMUNITY

DEVELOPMENT COMMISSION MEMBERS
Gabriela Gomez, Council Member/Agency Member
Maria Pulido, Council Member / Agency Member
Francis De Leon Sanchez, Council Member/Agency Member
Marco Barcena, Mayor Pro Tern / Vice Chair
Jorgel Chavez, Mayor/ Chair

PRESENTATIONS
• GATEWAY CITIES COUNCIL OF GOVERNMENTS ENERGY ACTION AWARD • RECOGNIZING BLACK HISTORY MONTH

PUBLIC COMMENTS ON NON -AGENDA ITEMS UNDER THE SUBJECT MATTER

JURISDICTION OF THE CITY COUNCIL/ SUCCESSORAGENCY
During this time, the members of the public may address the City Council / SuccessorAgency regarding any items within the subject matter jurisdiction of the City Council / Successor Agency. Public comments are limited to 3 minutes per person subject to an overall 30-minute period for non -agenda items.

Government Code Section 54590 prohibits the City Council / Successor Agency from taking action or engaging in discussion on a specific item unless it appears on the agenda.

PUBLIC COMMENTS ONAGENDAITEMS ONLY
During this time, the members of the public may address the City Council /Agency Members regarding any items listed on the agenda. Public comments are limited to 3 minutes per person.

CITY MANAGER'S REPORT
CONSENT CAL E N DAR (item Nos. 1 -9)
All matters listed under the Consent Calendar are considered to be routine and can be acted on by one roll call vote. There will be no separate discussion of these items unless members of the City Council / Successor Agency request specific items to be removed from the Consent Calendar for separate action. 2 Items called for separate discussion will be heard as the next order of business.

1. GENERAL MOTION TO WAIVE FULL READING AND APPROVE ORDINANCES BY TITLE ONLY PURSUANT TO CALIFORNIA GOVERNMENT CODE SECTION 36934 In order to expedite the conduct of business at City Council meetings, California State Law (California Government Code Section 36934) allows Ordinances to be read by title if a majority of the legislative body supports the motion to waive the full reading.

Recommendation:

It is staff's recommendation that the City Council approve a general motion to waive full reading and approve Ordinances by title only pursuant to California Government Code Section 36934.

2. APPROVAL MINUTES OF JANUARY 22, 2024 CITY COUNCIL CLOSED SESSION AND

CITY/ SUCCESSOR AGENCY JOINT MEETINGS
Approve the minutes of the January 22, 2024 City Council Closed Session and City/Successor Agency Joint Meetings.

Recommendation:

It is staff's recommendation that the City Council approve the minutes of the January 22, 2024 Closed Session and City/Successor Agency Joint Meetings.

3. WARRANT REGISTERS AND WIRE TRANSFERS
In approving the action of receiving and filing the warrant registers, the official minutes of the Bell Gardens City Council should state that each individual member of the City Council is not voting on, influencing the outcome of, or participating in approving, accepting, receiving or filing any warrant which bears the name of the same council member, or pays for any costs or expenses, or otherwise benefits the same named council member. Each council member will not be participating, influencing or voting on any such warrant bearing their name or which benefits the same named council member, but with that exception is voting in favor of receiving and filing all other warrants contained in this report, unless otherwise noted on the record at the time of the approval of the action required by this report.

Recommendation:

It is staff's recommendation that the City Council receive and file the warrant registers, wire transfers, and net payrolls dated 01 /11 /2024 and 01 /16/2024.

4. WARRANT REGISTER SUCCESSORAGENCY
In approving the action of receiving and filing the warrant registers, the official minutes of the Successor Agency should state that each individual member of the Successor Agency is not voting on, influencing the outcome of, or participating in approving, accepting, receiving or filing any warrant which bears the name of the same Successor Agency Member, or pays for any costs or expenses, or otherwise benefits the same named Successor Agency Member. Each Successor Agency Member will not be participating, influencing or voting on any such warrant bearing their name or which benefits the same named Successor Agency Member, but with that exception is voting in favor of receiving and filing all other warrants contained in this report, unless otherwise noted on the record at the time of the approval of the action required by this report.

Recommendation:

It is staff's recommendation that the Successor Agency Members receive and file the warrant register dated 01/16/24.

5. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BELL GARDENS,

CALIFORNIA, UPDATING THE CITYWIDE CLASSIFICATION AND COMPENSATION 51 PLAN AND APPROVING A BUDGET APPROPRIATION TO ESTABLISH/ AMEND STAFF

POSITIONS IN THE COMMUNITY DEVELOPMENT DEPARTMENT FOR THE

IMPLEMENTATION OF THE RENT STABILIZATION AND TENANT EVICITION PROTECTIONS PROGRAM AS ESTABLISHED BY ORDINANCE NO. 925 Adopt the updated Citywide Classification and Compensation plan and approval of Class Specifications in the Community Development Department to properly support and implement the Bell Gardens Rent Stabilization Program as established by Ordinance No. 925.

Recommendation:

It is recommended that the City Council:

1. Establish the positions of Housing Specialist 11, Housing Programs Supervisor, and Housing I nspector/Code Enforcement Officer;

2. Amend the title of Director of Community Development to Deputy City Manager / Director of Community Development;

3. Update the job specification of Housing Specialist to reflect updated chain -of -command; and

4. Adopt the attached Resolution establishing the salary range of the newly established positions and reflecting recommended position title amendments.

6. APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO SOLICIT

BIDS FOR THE SOIL REMEDIATION PROJECT AT THE FORMER BERK OIL SITE (CIP NO. 3927
The plans and specifications for the Soil Remediation Project at the former Berk Oil Site have been prepared. Approval of this item will allow the City to advertise the project for bids.

Recommendation:

It is staff's recommendation that the City Council:

1. Approve plans and specifications for the Soil Remediation Project at the former Berk Oil Site; and

2. Authorize staff to solicit competitive bids and publish the Notice Inviting Sealed Bids.

7. AWARD OF PROFESSIONAL SERVICES AGREEMENT FOR MUNICIPAL ENGINEERING

SERVICES
Consideration of a Resolution to approve a Professional Services Agreement with Bowman Infrastructure Engineers Ltd. for Municipal Engineering Services.

Recommendation:

It is staff's recommendation that the City Council:

1. Adopt the attached Resolution; and

2. Authorize the City Manager to execute a Professional Services Agreement with Bowman Infrastructure Engineers Ltd. (Bowman Infrastructure) for ongoing as -needed Municipal Engineering Services, subject to City Attorney approval as to form.

8. CALIFORNIA OFFICE OF EMERGENCY SERVICES ALLOTMENT APPROVAL The California 9-1-1 Emergency Communications Branch awarded the Bell Gardens Police Department an allotment of funds from the Governor's Office, which oversees the California Office of Emergency Services (CAL OES). The funds are to be used to complete state mandated upgrades to the Police Department's Dispatch center.

Recommendation:

It is staff's recommendation that the City Council adopt the attached Resolution accepting funds from the California Office of Emergency Services (CAL OES) and appropriate these funds for use by the Bell Gardens Police Department.
4 9. A RESOLUTION DECLARING A CLIMATE EMERGENCY AND ENDORSING THE CALL

FORAGLOBAL FOSSIL FUEL NON-PROLIFERATION TREATY
Approval of a Resolution declaring a climate emergency and endorsing the call for a global fossil fuel non-proliferation treaty.

Recommendation:

It is the staff's recommendation that the City Council adopt a Resolution declaring a climate emergency and endorsing the call for a global fossil fuel non-proliferation treaty.

DISCUSSION (Item Nos. 10 -11)

10. LOCAL COMMISSIONS APPOINTMENT LIST
The Local Commissions Appointments List outlines the City of Bell Gardens Commissions and Commissioners. Per the Bell Gardens Municipal Code, City Commissions consist of Bell Gardens residents appointed by each member of the City Council. Council Members may remove commissioners during any regular City Council meeting and may appoint commissioners following 10 working days after the posting of the vacancy notice.

Recommendation:

It is staff's recommendation that the City Council review the Commissions Appointments List and by motion, remove commissioners and/or make appointments to the posted vacancies.

11. UPDATE ON CITY RENT STABILIZATION AND TENANT EVICTION PROTECTIONS ORDINANCE (BGMC CHAPTERS 5.62AND 5.63)
Update on the City's Rent Stabilization and Tenant Eviction Protections Ordinance No. 925 pertaining to BGMC Chapters 5.62 and 5.63.

Recommendation:

It is staff's recommendation that the City Council discuss and consider one of the following actions:

1. Receive and file this report and take no further action; or

2. Direct staff to further analyze BGMC Chapters 5.62 and 5.63 and bring back recommendec amendments at a noticed public hearing.

CITY COUNCIL / SUCCESSORAGENCY MEMBER COMMENTS

ADJOURNMENT
Daisy Gomez, City Clerk
Agenda posted on February 8, 2024.

CITY OF BELL GARDENS

OFFICE OF THE CITY MANAGER
f b.

AGENDAREPORT
Item 1.

TO: Honorable Mayor and City Council Members
FROM: Michael B. O'Kelly, City Manager
BY: Daisy Gomez, City Clerk
SUBJECT: GENERAL MOTION TO WAIVE FULL READING AND APPROVE ORDINANCES BY TITLE ONLY PURSUANT TO CALIFORNIA GOVERNMENT CODE SECTION 36934 DATE: February 12, 2024
RECOMMENDATION:

It is staff's recommendation that the City Council approve a general motion to waive full reading and approve Ordinances by title only pursuant to California Government Code Section 36934.

BACKGROUND/DISCUSSION:

In order to expedite the conduct of business at Council meetings, California State Law (California Government Code Section 36934) allows Ordinances to be read by title if a majority of the Council supports the motion waiving the full reading. Most California cities adopt a standard motion at the beginning of each meeting in order to effectuate this waiver.

Since most of the Ordinances introduced and adopted consist of multiple pages of technical language, reading by title only allows the Council to eliminate the communication of redundant information and attend to other matters during the meetings. Otherwise, the entire Ordinance language will have to be read in full.

CONCLUSION:

Allowing ordinances to be read by title only, according to California State Law, will expedite the conduct of business at Council Meetings.

FISCAL IMPACT:

No fiscal impact.

APPROVED ELECTRONICALLY BY:

Michael B. O'Kelly, City Manager
Stephanie Vasquez, City Attorney and/or Susie Altamirano, Assistant City Attorney Manuel Carrillo, Director of Finance and Administrative Services C.

CITY OF BELL GARDENS

OFFICE OF THE CITY MANAGER
f b.

AGENDAREPORT
Item 2.

TO: Honorable Mayor and City Council Members
FROM: Michael B. O'Kelly, Executive Director
BY: Daisy Gomez, City Clerk
SUBJECT: APPROVAL MINUTES OF JANUARY 22,2024 CITY COUNCIL CLOSED SESSION AND

CITY/ SUCCESSOR AGENCY JOINT MEETINGS
DATE: February 12, 2024
RECOMMENDATION:

It is staff's recommendation that the City Council approve the minutes of the January 22, 2024 Closed Session and City/Successor Agency Joint Meetings.

BACKGROUND/DISCUSSION:

Every Closed Session and City/Successor Agency Joint Meetings the City Clerk documents the actions made by the Agency Members/City Council.

CONCLUSION:

If approved, the minutes of the Closed Session and City/Successor Agency Joint Meetings will be archived in the City Clerk's Office.

FISCAL IMPACT:

No fiscal impact.

ATTACHMENTS:

Exhibit 1 - Minutes of January 22, 2024 Regular City Council/Successor Agency Joint Meeting Exhibit 2 - Minutes of January 22, 2024 Closed Session
APPROVED ELECTRONICALLY BY:

Michael B. O'Kelly, City Manager
Stephanie Vasquez, City Attorney and/or Susie Altamirano, Assistant City Attorney Manuel Carrillo, Director of Finance and Administrative Services 7 CITY OF BELL GARDENS

CITY COUNCIL/ SUCCESSOR AGENCY TO THE COMMUNITY

DEVELOPMENT COMMISSION

JOINT MEETING
M0NDAY, JANUARY 22, 2024, 6:00 PM

MINUTES
LOCATION: CITY COUNCIL CHAMBERS, 7100 GARFIELD AVENUE, BELL GARDENS, CA90201 PUBLIC PARTICIPATION: The members of the public may address the City Council / Agency Members on any item listed on the agenda or on matters which are not listed on the agenda but are within the subject matter jurisdiction of the City Council / Successor Agency. Public comments are limited to three (3) minutes per person for each designated public comment period(s). Public comments for non - agenda items will be limited to a total of 30 minutes. Public comments can be made by any of the following ways:

IN -PERSON: Members of the public can provide in -person comments at the podium in the Council Chamber. The Council Chambers will have seating available for members of the public to attend the meeting in person, subject to capacity limits. Public comments are limited to three (3) minutes for each designated public comment period(s) per speaker, unless a different time is announced by the presiding chair. Speakers who wish to address the City Council / Agency Members should do so by submitting a "Public Comment Card" card by 5:00 p.m. for Closed Session items and by 6:00 p.m. for all other designated public comment periods as listed.

BY TELEPHONE: Phone Number: (669)900-9128 Webinar I D: 813 3236 4343# Passcode: 2021# To address the City Council press *9 to raise your hand then *6 to unmute yourself when instructed.

VIRTUALLY LIVE: Members of the public may participate via Zoom by https://zoom.us/join and entering the Zoom Meeting I D: 813 3236 4343 Passcode: 2021
Comments may also be made via the Zoom app by using the "Raise Hand" feature when it is your turn to speak the host will unmute you. Comments will not be accepted in the QandA Chat function of the zoom app.

WRITTEN COMMENTS: Public comments may be emailed to [email protected] or mailed to: City Clerk's Office, 7100 Garfield Ave., Bell Gardens, CA 90201. To ensure distribution to the members of the City Council /Agency Members prior to consideration of the agenda, please submit comments no later than one (1) hour prior to the meeting. Those comments, as well as any comments received after, will be distributed to the members of the City Council / Successor Agency and will be part of the official public record of this meeting.

For more information, you may contact the City Clerk's office during regular business hours 7:30 a.m. to 6:00 p.m., Monday through Thursday at (562) 806-7704.

PUBLIC HEARING: Public participation will be separately called for the public to provide comments at the time of each public hearing item. Speakers who wish to provide a comment should do so by submitting a "Public Comment Card" to the staff liaison, clerk, prior to the designated public comment period.

Exhibit 1 8

CALL TO ORDER
The Council Members of the City of Bell Gardens City Council/Successor Agency held a Joint Regular meeting on January 22, 2024, in the Council Chambers, 7100 Garfield Avenue, Bell Gardens, CA with Mayor Jorgel Chavez presiding. Mayor Jorgel Chavez called the joint meeting to order at 6:05 p.m.

INVOCATION
The invocation was given by Minister Daniel Anguiano.

PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Girl Scout Brownie Troop #2543.

ROLL CALL OF CITY COUNCIL MEMBERS / SUCCESSOR AGENCY TO THE COMMUNITY

DEVELOPMENT COMMISSION MEMBERS

Present:

Gabriela Gomez, Agency Member/Council Member
Maria Pulido, Agency Member/Council Member
Francis De Leon Sanchez, Agency Member/Council Member
Marco Barcena, Vice Chair/Mayor Pro Tern
Jorgel Chavez, Chair/Mayor

Absent:

None

PRESENTATIONS
• CERTIFICATE OF RECOGNITION - BELL GARDENS HIGH SCHOOL FOOTBALL TEAM
Mayor Jorgel Chavez read the certificate of recognition and presented it to Division 14. • CERTIFICATE OF RECOGNITION -HAM BURGUESAS URUAPAN
This item was heard after the Certificate of Recognition - Outgoing Toastmasters Officers.

Mayor Jorgel Chavez read the certificate of recognition and presented it. • CERTIFICATE OF RECOGNITION -OUTGOING TOASTMASTERS OFFICERS This item was heard prior to the Certificate of Recognition - Hamburguesas Uruapan and after the Certificate of Recognition - Bell Gardens High School Football Team.

Mayor Pro Tern Marco Barcena read the certificate of recognition and presented it to the outgoing Club President Rene Estrada, incoming Club President Monica Gross, and Club 587.

PUBLIC COMMENTS ON NON -AGENDA ITEMS UNDER THE SUBJECT MATTER Exhibit 1 9

JURISDICTION OF THE CITY COUNCIL/ SUCCESSOR AGENCY
City Clerk Daisy Gomez announced that there were no written comments received.

Ciro Alvarez spoke in opposition to rent stabilization.

Gerber Barrios and Irma Monzon Lopez spoke in opposition to rent stabilization.

Bruce Crow spoke regarding various topics.

Norma Cabral spoke regarding rent control.

Rogelio Rodriguez spoke regarding various topics.

Guadalupe Rodriguez spoke in opposition to rent stabilization.

PUBLIC COMMENTS ONAGENDAITEMS ONLY
City Clerk Daisy Gomez announced that there were no written comments received.

Bruce Crow spoke regarding Item Nos. 7, 8, and 10.

CITY MANAGER'S REPORT
City Manager Michael O'Kelly provided a brief report.

CONSENT CALENDAR (Item Nos. 1 -10)
All matters listed under the Consent Calendar are considered to be routine and can be acted on by one roll call vote. There will be no separate discussion of these items unless members of the City Council / Successor Agency request specific items to be removed from the Consent Calendar for separate action.

Items called for separate discussion will be heard as the next order of business.

A motion was made by Councilmember Francis De Leon Sanchez seconded by Councilmember Gabriel Gomez to approve Consent Calendar Item Nos. 1 - 10.

The motion carried 5-0 with the following vote for Item Nos. 1 -10:

AYES:

Gomez, Pulido, Sanchez, Barcena, Chavez
NOES:

None
ABSENT:

None
ABSTAI N:

None

1. GENERAL MOTION TO WAIVE FULL READING AND APPROVE ORDINANCES BY TITLE ONLY PURSUANT TO CALIFORNIA GOVERNMENT CODE SECTION 36934 In order to expedite the conduct of business at City Council meetings, California State Law (California Government Code Section 36934) allows Ordinances to be read by title if a majority of the legislative body supports the motion to waive the full reading.

Exhibit 1 10

Recommendation:

It is staff's recommendation that the City Council approve a general motion to waive full reading and approve Ordinances by title only pursuant to California Government Code Section 36934.

2. APPROVAL MINUTES OF JANUARY 8, 2024 CITY / SUCCESSOR AGENCY JOINT

MEETING
Approve the minutes of the January 8, 2024 City/Successor Agency Joint Meeting.

Recommendation:

It is staff's recommendation that the City Council approve the minutes of the January 8, 2024 City/Successor Agency Joint Meeting.

3. WARRANT REGISTERS AND WIRE TRANSFERS
In approving the action of receiving and filing the warrant registers, the official minutes of the Bell Gardens City Council should state that each individual member of the City Council is not voting on, influencing the outcome of, or participating in approving, accepting, receiving or filing any warrant which bears the name of the same council member, or pays for any costs or expenses, or otherwise benefits the same named council member. Each council member will not be participating, influencing or voting on any such warrant bearing their name or which benefits the same named council member, but with that exception is voting in favor of receiving and filing all other warrants contained in this report, unless otherwise noted on the record at the time of the approval of the action required by this report.

Recommendation:

It is staff's recommendation that the City Council receive and file the warrant registers, wire transfers, and net payrolls dated 12/28/23, 01/02/24 and 01/09/24.

4. WARRANT REGISTER SUCCESSORAGENCY
In approving the action of receiving and filing the warrant registers, the official minutes of the Successor Agency should state that each individual member of the Successor Agency is not voting on, influencing the outcome of, or participating in approving, accepting, receiving or filing any warrant which bears the name of the same Successor Agency Member, or pays for any costs or expenses, or otherwise benefits the same named Successor Agency Member. Each Successor Agency Member will not be participating, influencing or voting on any such warrant bearing their name or which benefits the same named Successor Agency Member, but with that exception is voting in favor of receiving and filing all other warrants contained in this report, unless otherwise noted on the record at the time of the approval of the action required by this report.

Recommendation:

It is staff's recommendation that the Successor Agency Members receive and file the warrant register dated 01/02/24.

5. NOVEMBER2023 TREASURER'S REPORT
The Treasurer's Report is a list of cash, investment portfolio and restricted bond cash held by the City.

Recommendation:

It is recommended that the City Council receive, approve, and file the November 2023 Treasurer's Report.

Exhibit 1 11

6. DECEMBER2023 TREASURER'S REPORT
The Treasurer's Report is a list of cash, investment portfolio and restricted bond cash held by the City.

Recommendation:

It is recommended that the City Council receive, approve, and file the December 2023 Treasurer's Report.

7. A RESOLUTION AUTHORIZING A COST RECOVERY PROGRAM AGREEMENT WITH

THE CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, LOS ANGELES A request to approve a Cost Recovery Program Agreement with the California Regional Water Quality Control Board, Los Angeles Region.

Recommendation:

It is staff's recommendation that the City Council:

1. Adopt the attached Resolution authorizing a Cost Recovery Program Agreement with the California Water Quality Control Board, Los Angeles Region, for environmental investigation and cleanup oversight of the contaminated former Berk Oil and Pacific Metal Craft property located at 5600-5636 Shull Street, subject to City Attorney approval, as to form; and

2. Appropriate $312,914.86 from the General Fund to be reimbursed by DTSC's Equitable Communities Revitalization Grant funding.

Resolution No. 2024-03 was approved

8. RESOLUTION APPOINTING A SECOND ALTERNATE TO THE GOVERNING BOARD OF

THE LOS ANGELES GATEWAY REGION INTEGRATED WATER MANAGEMENT

AUTHORITY
Consideration of a Resolution appointing a second Alternate Member to the Governing Board of the Los Angeles Gateway Region Integrated Water Management Authority.

Recommendation:

It is staff's recommendation that the City Council adopt the attached Resolution appointing a second Alternate to the Los Angeles Gateway Region Integrated Regional Water Management Joint Powers Authority (GWMA) Governing Board.

Resolution No. 2024-04 was approved

9. RESOLUTION APPROVING A FIFTH AMENDMENT TO ENGINEERING SERVICES AGREEMENT WITH BOWMAN INFRASTRUCTURE ENGINEERS LTD. DBA

INFRASTRUCTURE ENGINEERS TO EXTEND THE TERM FOR ONE ADDITIONAL MONTH
Consideration of a Resolution approving a Fifth Amendment to the Engineering Services Agreement with Bowman Infrastructure Engineers Ltd. dba Infrastructure Engineers to extend the term through February 29, 2024.

Recommendation:

It is staff's recommendation that the City Council adopt the attached Resolution authorizing the City Manager to execute the Fifth Amendment with Bowman Infrastructure Engineers Ltd. dba Infrastructure Engineers.

Resolution No. 2024-05 was approved
Exhibit 1 12

10. AWARD OF CONSTRUCTION CONTRACT FOR THE JOHN ANSON FORD PARK REGIONAL AQUATICS CENTER IMPROVEMENTS (CIP NO. 3888) (CDBG PROJECT NO.602095-19)
Consideration of award of a Construction Contract to Bernards Bros. I nc. for the John Anson Ford Park Regional Aquatics Center Improvements.

Recommendation:

It is staff's recommendation that the City Council by motion:

1. Award a Construction Contract to Bernards Bros. Inc. for the John Anson Ford Park Regional Aquatics Center Improvements; Cl P 3888; CDBG Project No. 60295-19;

2. Authorize the City Manager to execute the Construction Contract, subject to City Attorney approval as to form; and

3. Authorize the City Manager to approve change orders that may be necessary during construction to cover any unforeseen condition in an amount not to exceed 6% of the Construction Contract.

DISCUSSION (Item No. 11)

11. LOCAL COMMISSIONS APPOINTMENT LIST
The Local Commissions Appointments List outlines the City of Bell Gardens Commissions and Commissioners. Per the Bell Gardens Municipal Code, City Commissions consist of Bell Gardens residents appointed by each member of the City Council. Council Members may remove commissioners during any regular City Council meeting and may appoint commissioners following 10 working days after the posting of the vacancy notice.

Recommendation:

It is staff's recommendation that the City Council review the Commissions Appointments List and by motion, remove commissioners and/or make appointments to the posted vacancies.

A motion was made by Councilmember Gabriela Gomez, seconded by Mayor Pro Tern Marco Barcena to appoint Monica Kakimoto to fill Councilmember Gabriela Gomez vacancy in the Senior Citizen Commission.

The motion carried 5-0 with the following vote:

AYES:

Gomez, Pulido, Sanchez, Barcena, Chavez
NOES:

None
ABSENT:

None
ABSTAI N:

None

CITY COUNCIL / SUCCESSOR AGENCY M EM BER COM M ENTS
Members of the Council and Successor Agency made community announcements and comments.

ADJOURNMENT
Mayor Jorgel Chavez adjourned the meeting at 7:33 p.m.

Exhibit 1 13

Daisy Gomez, City Clerk
Agenda posted on January 18, 2024.

Exhibit 1 14

CITY OF BELL GARDENS

CITY COUNCIL

REGULAR MEETING - CLOSED SESSION
MONDAY, JANUARY 22, 2024
5:00 PM

MINUTES
LOCATION: CITY COUNCIL CHAMBERS, 7100 GARFIELD AVENUE, BELL GARDENS, CA 90201 The meeting will be held at Bell Gardens City Hall in the Council Chambers. The public may attend the meeting in person or virtually as instructed below. You may view the meeting live on the City's website at https://www.bellgardens.org/i-want-to/watch-city-council-meetings .

ACCESSIBILITY: If requested, the agenda and backup materials will be made available in appropriate alternative formats to persons with a disability, as required by Section 202 of the Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132), and the federal rules and regulations adopted in implementation thereof. Any person who requires a disability -related modification or accommodation, in order to observe and/or offer public comment may request such reasonable modification, accommodation, aid, or service by contacting the City Clerk's office by telephone at 562-806-7704 or via email to CityClerkDesk(d)-bellgardens.org no later than 72-hours before the scheduled meeting.

PUBLIC PARTICIPATION: The members of the public may address the City Council on any item listed on the agenda. Public comments are limited to three (3) minutes. Public comments for non - agenda items will be limited to a total of 30 minutes. Public comments can be made by any of the following ways:

IN -PERSON: Members of the public can provide in -person comments at the podium in the Council Chamber. The Council Chambers will have seating available for members of the public to attend the meeting in person, subject to capacity limits. Public comments are limited to (3) minutes per speaker, unless different time is announced by the presiding chair. Speakers who wish to address the City Council should do so by submitting a "Public Comment Card" by 5:00 pm.

BY TELEPHONE: Phone Number: (669)900-9128 Webinar ID: 813 3236 4343# Passcode: 2021# To address the City Council press *9 to raise your hand then *6 to unmute yourself when instructed.

VIRTUALLY LIVE: Members of the public may participate via Zoom by https://zoom.us/loin and entering the Zoom Meeting ID: 813 3236 4343 Passcode: 2021 Comments may also be made via the Zoom app by using the "Raise Hand" feature when it is your turn to speak the host will unmute you. Comments will not be accepted in the QandA Chat function of the zoom app.

WRITTEN COMMENTS: Public comments may be emailed to PublicComments(a)-bellgardens.org or mailed to: City Clerk's Office, 7100 Garfield Ave., Bell Gardens, CA 90201. To ensure distribution Exhibit 2 15

to the members of the City Council prior to consideration of the agenda, please submit comments no later than one (1) hour prior to the meeting. Those comments, as well as any comments received after, will be distributed to the members of the City Council and will be part of the official public record of this meeting.

For more information, you may contact the City Clerk's office during regular business hours 7:30 a.m. to 6:00 p.m., Monday through Thursday at (562) 806-7704.

CALL TO ORDER
The Council Members of the City of Bell Gardens City Council held a regular meeting on January 22, 2024, in the Council Chambers, 7100 Garfield Avenue, Bell Gardens, CA with Mayor Jorgel Chavez presiding at 5:06 p.m.

ROLL CALL OF CITY COUNCIL MEMBERS

Present: Gabriela Gomez, Council Member
Maria Pulido, Council Member
Francis De Leon Sanchez, Council Member
Marco Barcena, Mayor Pro Tem
Jorgel Chavez, Mayor
/_1• - ►=

PUBLIC COMMENTS ON AGENDA ITEMS ONLY
City Clerk Daisy Gomez announced that there were no written comments and no public comments were provided.

CLOSED SESSION (Item Nos. 1 - 3):

City Attorney Stephanie Vasquez announced that the Closed Session items are listed on the agenda.

The City Council recessed into closed session at 5:07 p.m. to discuss the items as listed on the agenda.

1. CONFERENCE WITH LEGAL COUNSEL ANTICIPATED LITIGATION -

SIGNIFICANT EXPOSURE TO LITIGATION PURSUANT TO GOVERNMENT CODE SECTION 54956.9 SUBDIVISION (D)(2)
One (1) Matter

2. PURSUANT TO GOVERNMENT CODE SECTION 54957 — ANNUAL PUBLIC

EMPLOYEE PERFORMANCE EVALUATION PURSUANT TO TERMS OF

AGREEMENT
Title: City Manager
Exhibit 2 16

3. PURSUANT TO GOVERNMENT CODE SECTION 54957.6 - CONFERENCE

WITH LABOR NEGOTIATOR
City Designated Representative: Stephanie Vasquez, City Attorney Unrepresented Employee: City Manager

CLOSED SESSION REPORT
The City Council reconvened to open session at 6:04 p.m., City Attorney Stephanie Vasquez announced that there was no reportable action.

ADJOURNMENT
Mayor Jorgel Chavez adjourned the meeting at 6:05 p.m.

Daisy Gomez, City Clerk
Agenda was posted on January 18, 2024.

Exhibit 2 17

CITY OF BELL GARDENS

OFFICE OF THE CITY MANAGER
f b.

AGENDAREPORT
Item 3.

TO: Honorable Mayor and City Council Members
FROM: Michael B. O'Kelly, City Manager
BY: Manuel Carrillo, Director of Finance & Administrative Services SUBJECT: WARRANT REGISTERS AND WIRE TRANSFERS
DATE: February 12, 2024
RECOMMENDATION:

It is staff's recommendation that the City Council receive and file the warrant registers, wire transfers, and net payrolls dated 01 /11 /2024 and 01 /16/2024.

BACKGROUND/DISCUSSION:

The attached warrant registers, wire transfers, and net payrolls are for 01/11/2024 and 01/16/24. The warrant registers, wire transfers, and net payrolls reflect the financial obligations of the City for the above referenced dates.

CONCLUSION:

If the recommendation to the City Council is approved, then the warrant registers, wire transfers, and net payrolls dated 01 /11 /2024 and 01 /16/2024 will be received and filed.

FISCAL IMPACT:

ATTACHMENTS:

EXHIBIT-1 WARRANT REGISTER
APPROVED ELECTRONICALLY BY:

Michael B. O'Kelly, City Manager
Stephanie Vasquez, City Attorney and/or Susie Altamirano, Assistant City Attorney Manuel Carrillo, Director of Finance and Administrative Services 18 r
d
O
a
w' I r- 1` N N Iq It r O Cl O O �T d' O Cf N N 0 0 O N N 1- O O CO _ ''..... 't v O 0o w w N N O 00 O a* Cp t0 M M O O It 07 1,- CO - T CO 0 r O O M M vi (O t6 O Ln 00 1� PZ T r CM M �- r 1- M It Ln M to LO QO O O CO 00 'ITT V 1- 1-0 IT It It LO U) LI) Ln N N rM 14' O (O CO M M (O W M M CO 0 M M � M (O W CO t0 N N r Cf) - W N
ONO coNN N � M In W r
T
LL
z .. �. gov .,
W O O O O /�� �1 O O N O a 0 "� p
g H W~ H H VVF H N~ UO ~ D- w d vO N
a z g it Ix N CO U) a N ix �z
a QQ `� ❑ ~ a' =) �v
3 w a w �wW� z
O ~ a W dd
o w N _iof w w z m LL z
a Z O = j w z O W Q
o U H V m (n g U J (L CL O
:p ¢J¢ Z J ❑ > U U Q Q > a a' Q
L- W w 0 Cl) w cn cn m O cn O m m; cn cn
(A ❑ Q } (n a m z rn m m CO (n w
o IWi v~i 2 (L as a a x m of Ixwlyw IL
O
a
0 00
M
N
1-
N
LO
N
O
N
LO
cM
j
X } (O
�
ti
C\lti

CMO N M
ti
m
N
O
d
Ui
U)
C
LO
C
LO
C
T M
O O O
LOC
C
U
f` N
O W
J
r
i 0 O
(O a Z
()
m
0)
m
0)
m
N
m
O CD O
O O O
0 m
w
❑
coLL
LO
r a> LO
LO
O7
of
U
Z
Q
m
Z
Vj
U)
W
C6
w
w
U
U
U
�
o
w
H
H
W L7
04 W
w
w
O
Q
o
d
W
Q
z
U'
j
W
w
Q
H
D
CO
F=-
U W
itz
O
O
w
D
z =
oN
CO
0a
w
Z
Z
J
CO
Q
O
Z
m
U
¢
m
2 ad
a
a
a
a a
O
0 m
co
N
M
O
00 M
0A
O
0 CO
0 M
r-
�
O
(Op
O
co
O
C
M
O
O
co
O-
d
�J
CD
Co
O
O
O
O
O
O
O
O
O
O
O
O
O
O O
,�T
Nt
It
It
It
It
I- �t
,0
N
N
NNN
N
N
N N
03 O
O
O
O
O
O
O
O
O
O O
G
r
N
N
N
N
N
N
N
N N
�-
O
CO
w
w
O
(O O
9 O
M
It
LO
co 00
OD
CD
�
OD
r
OD 00
�
co co 00 co co 00
rn
X
w

N C Mr M 000OLO0000Lf)LO000 c0 N N N N It O Cl O O O Oo0000co 3 M N 00 0 0 0 0 M O O O M O W — m 00 �r V c0 CO N 0 0 LO in Q O N c0 I- M O 00 V W OOO(DCO000Md) W,* C`) M 00 r t} d' N N O Od' OOLO, Q N W M LO LO LO LO Ln LO LO LO M o0 CO W r r W O 00 M M V le LO LO 00 a r O) r� V) M M r r
cM O 00 N N r T M r
r r
O
O
N
a
M (000 W m `1 .. .. N ..
o Q :° �° :: o W Lwa
-0 I d W OOOOQOOOMQ-M�O ❑ W W U U UUwUW
v ����o-c�n�(nw�OC�O U)to U O ❑ ❑❑❑❑❑
Q, > d �voc�o�O)ONLf) 00�M Z U U w d to (n(nwfnw
O *b*k (Of Jjit* *k*N !*k*Nk J ¢ ¢ LL O z zzwzZ
O. Z U HHHF_1=2Z HH F- w c=1 �U' U � a ddXaa
zzzzw�z?zzzzz = ¢ ¢ u) x x x w x x
w »»> > »»> N z w ww(nww
d❑❑❑❑❑❑❑❑❑❑❑❑❑ w UU N
c Na- �aaaU��aaaa�a z v tvi0Of=a
O
a
N
z
w u) N
tl! a N N NMc'MMCO
Q N N co O O M 0) O O N N N N
J N N N O CO 0 0
(' d �_ r- O N r N N r N N N_ N_
L J V c 0 OMd'LnOp00M.�} LC1cOf�0 O N N O rr
d J p C �_ N M V LA LO U') LO (O ce) 0 0 N O 0 CO fO C0 > D N M M M M M M M M M M M M O r- ti C O r LO - r M
m C U Ln O) 0 0) d) O) a7 0) 6) O) O) O) WOO) O LO LO r O O O M 0) M M M M M M M M M M M M M M O N N r m O
LL
O
H
V w
wOf U
J
U
w a
w �z `z N
U)V)
O w w
U U
> w O w
W -j w
w (U
n co Y
U U) 2 It Q
Q Z U (On Z
¢ Q Q Q ¢ Q m
00 O 0
0 q N Ot 0
C Cl) c0 Cl) N CID
O O

CDCDO O O
Nr It
+O04 -' O O

N N N N N N N
(00 cr(0 co co co co
Ec
T C
lT 0
U
� d
N -O
O
N V Z CD 00
0 0 i- N_ 'T
C C1 O) O) O) O) 0 d) O)
3 O 00
L
CD m ; O 00 000 000 OOD 000 000 X
CDr r r w

Cl)
co
z
LU
LU
J �
d J
7 m
LL
rO
r_
V
•'
=
'ctOvOrN000
f� 'It O O O r h O r
O
O
O
O
0 O
00O
O O O
0 r
0 e-
CO
I%
CO
ti
f�
00 CA 0
00 ti
0 r
0)
3 p
4C'7�r00 co
O
O
O
Cp 0 M
O
O
M
M
CO
0 CO
LO
r
co
ty
po
p
E
— 00
f� M N CO N r r It co
vOO(ON?
N
N
)
N M 0
�
r
M
M
CO
N al
In
90 C.
��
00 00
00 LO
Q
r r r v N O>
r
CM
r
Ch
00 C6
�
et
r'
�
M
M
CF)
t'M
01 L" f
r
r
r
r
r
CDO
r
r
ram+
w
ram+
w
04 m
w
Q'
m +�+
ate+
ram+
N
ram+
O
F-
Cl)
O
H
O
t� O H
O
H
d'
O
F-
Q
U
O
H
O
F-
N
p
O
H
>
O
O
F
v
co
N N
�N
z
m
z
U
No

N M M N M
p0iiNNOON
N
p
r
J
(�
I-
M
O
ci
Z
U
w
U-
N
r
WC
CN
'rtVU❑N
f�n
J
m
U
JQ
O
WU U w W U
p❑W W ❑❑W
Q
z
ZNw
❑
aw
W
W
w
WcUn
❑
w
�
U
Q
W W Z U w LU w w
ZZdfWtozzU
z
w
W a
W
m
J
dda
W
U
c
O

W WXZZ W W Z
¢
~
WLU
J
w
W
J
}
J
U
=
a. X X W a a X X d
U
�j
Ud'
w w
O
W
Z❑
❑
U
'L

W WXX W WX
C7
W
Z
mod'
Q.
q=
=
Q
Z
U
y
JfnU W W UUw
U
HF-
F-
v
H❑
❑
Z
d
m
UUU❑�UU❑
U
��
❑
No
❑
❑
❑
W
O
a U Q' w d
of
a
d d
d
N
d
CL
d
Q
CL
>
O
IL
'O ONONNNNN MM
Op 0p N N
C N N N N 04 N N N N v
r rNNN Op
C rOLOM00 N It
O ODI-- MItMP�- M
V 0l4tu)0400hrLO I-
Ln V) CD f- f- CO M CA 00
of
LU
H
z
W
U
❑
U
Y
Z
co
O CD
CD
o
v
p
O N
r
1 � r
CO
C
O
U
0)
v Z �
Y
7 000
m cc
v
00 00
M
0 CO
M
N
O
O
O
N
O
r
N 00 r
N,
O
N
CM
O r N
()
O
o
v
W
O
N
Q to
Ln LO LO
N N N
❑
r
Cl O
CM r
W N
W
Z Z)
Q 0
Z
W ❑
z O
Z
W
LL U)
O J
U W
W
W ~
2 U H
m m
m
0 Cl
v v
O O
co
r r
r r
LO CD
000 00
0 00
r r
❑
U
W
U
W J
to w
_J =
Q � H
J
U w
O
U J
Z � J
d
x Q Q
m U U
v I- m
LO ti n
to
0 0 0
N N N
0 0 0
co to CCD
r r r
r r r
n 00 m
r r r
co co OD
r r r
v
N
O
O
O
M
N
ti
N
r
D
Z
2 O
= Q
Cl)
O
z
m
O
J
',....,.

J
W
J W
H
Q w
w
2 U U
U
U
o
m
0 0
Nt Nt
v
Nt
N N
N
N
0 004
0 0
(0
r
co
r
r r
r
r
r
O r N04
M
000 000 000 000
r r r r
N
L
X
w

It
Q
T
T
T
N
O
N
co
T
O
C O O O 0 0 0 0 O O O O CA N r O O er 0 0 0 0 0 0 Cl O O 0) It 7 O O O O o 0 O O N 0n N r O O 0 0 0 0 0 0 0 0 O 0! C o p O O O CA CO r at O O N '1 1• r O to O W O (O 00 CO W CV er M 111 00 00 0 C r CO W r 00 00 W r- f• CO 0 CD O M CO M M W O M OD Q T to CA [O V' 0 lA C) m l0 0 M O V 0 W N N 0 r M— N W CA CO() C7 (O N A M (6 (D r r
N — r
O
A
r0+
ram+
N w
r
rp+
w
w
J
CO 0 CD C6
N
N
HO Q
❑
MN
p
MNNM
N1O
FO-
M
N
U
O '��
~
zNNN-W
ND
O
�Q�Cflcl)U
❑
m
C-4
�0
m
c`T-
N
2 V% -.JN ()>
r
M
W
(n
fAC4
O
(i'
W
O
N
Cl)
N
H
X�
>0¢J�m
Q U J
Q
W
W W
❑
O
U
W
a
J Z O— J Q
Q'z0��
0)❑
Q
QQ
z
U
N
❑
❑
N
OU
UU
Q
W
N
Z
z
W
O��Q�0-1 Z
U)
ots
E
r
J
J
Zv��Q
z
Z)»
J
J
z
�1-VUM
Z
V
J
J J
Z
m
O
0 Z
Z
U
D. q- of LL �
U
J
W
W(!)
LL Cn (4 U 0z
C?
Iq[
LL
J
a
❑
❑
LL
Cn
rt
Cl) COmUNm
fraaw
fra
m
w
r
0 aL
f`
LO
7 N
C
CD
O O_
U �
rn
0 a
U_
Z
0 U
of
W of Z LU
X O
Q Z
U CO
O J
O m
N
O CL
O W
O
U
(0 N
N N 00
0 0 CD
CD
� v
O O
(_0 (`D
M
N
O
N
W
❑
U
�`
0 O
O
m
g
O
Z
❑
OU
r
N
O
N
O
O
N
N
M
a-
CO)
M M
m
N
O
0 O
N
N
ti
N N
O O
M
O
m
N
N
00 N N
co
N
0 OU
N
O
O
O
O
O
C� O N M d' Lo
((0
N
N
N
CO
z0
m
N
-0
m
aN-��rr
O
m
ZQ
}
z
z
Of
d
W
2 z
0 w
Y
Q
of
D
O
U
J
Z
IL
Q
¢
w
�
U
Z
�
O
O
U
O
a
m
0 z
z
z
(Wa
a
-
¢
L
U
of
LU
O
D
Z
Z
O
Z
LL'
O
❑
❑
tL
W
}
m
}
J
W
Q
J
Q
J
X
U
W
❑
lL
0 U
O
�
0 0
0 't
00 ti
(n
00 O
0 O
o
O
O
O
00 O
O
O
O
N
N
N
N
N
N
N
N
O
N
O
N
O
N
O
N
O
N
O
N
O
0 CD
coo
((00
(00
(_0
C�0
(�O
M N N co N N N M M
0 00 Co 00 00 000 000 000 000 000
M C
00 00
r c-
N
N

LO
_ qt O 00 00 Cl CDLD 0 CO MJ O O 0 0 0 00 N In In CD CD0 0 'at It 0) M N M O 00 OR O O O O 00 00 0 0 O O O N (0 O 00 O O 0 0 I ti VM I� M O M 1- 00 M It le Ln Ln CO M O O M O M W Lo T W O O Lo M V M O 00 r I� OA N N M M M M N N r O O d' I\ � w LO M r- I- LD fp m r 00 a Of r r I� ^ r r 00 00 r m r O W r r r r Ln r
N N r r N
.`
u
Ln
m
C
l0
�+
-
U
Z
2 V)
Z
J
O
>
W
M
of
Y
J
O
W
¢
W
J
',. ❑
z
U
LL
W
0 Y
LLI
Z
O
U)
Q
o
>
H
z
M
O-'
W
J
U)
¢
O
d
o
¢
�'
a
o
w
a
J
w
O
LL
w
o
z
w
z
�
U
H
x
3:

U
O
❑
LL
w
w
z
w
❑
❑
u)
w
�Z
❑
W
W
W
LL
LLLL
LL
U
(D
2 2
O
�
_M
00 Ln
q'
O
�
It
h
O
�
M
00 Ln
''..
h
N
�
0)
coM
O
LO
N
O
O
00 O
O
O
O
�}
�
p^j
Cl)
'.. O
O
O
O
O
O
O
O
O
O
r
O
O
O
O
O
O
O
O
O
O
O
O
O
�
't
N
N
N
N
N
N
N
N
N
N
N
N
O
O
O
O
O
O
O
O
O
N
N
N
N
N
N
N
N
N
N
N
N
O
CD
Cfl
r
r
(0
r
CD
r
r
(�D
r
CSC
r
coo
r
w
r
r
M
CD f- O O
M
M M
M M M
a7
O O O O 0)
M 00 00 00 OD 00 Co
� r r r r r r
M
N
CN CO
r
) � 000 WOD c �_
DO r r r r r w

(c
47 CD
m
IL
• -gr NThNI'- 'tNOO .tN M M 0 0 O O O 00 'Rf 't -e U) LO N N (fl OO T M I, M (D U) CI tt ti Cn 01 O O N N O O O N N (O (O ;� -ct OR (D 3 et tt f- r M CO 't ti O M m M M T r O O M M 0 00 Q M CD W N N M CO Q A M 7 T M v '' tt LO 't p1 OO OO O O co 00 0 0 0 M 0 LO W - T N T LL) w w M M It le 00 w tt M CO)
Cl) d M
M
O
n
04 w
(fl Ln�6 ..

N_ LO
W � \ NM
!0
..

Lp
Z
..
—O
CKLLJ0
1 a
Q
a
z
O
z
�O
z
cW7
U
0 a00 U) Cd 5- 9�U
OVLL_Q(0zm w
�
U
—
z
a
�
0 5
J
z
_
p
U
U JCn❑mf)CO(nU0'
m
Q
J
d
w
Z
d
Q
(n
>
U
L<
❑ U U ❑ ❑ U U U 3 p
❑
❑
❑
❑
❑
❑
❑
❑
3:

LL.

UU�aawQ� 0�d(L
U
li
d
a
s
li
(L
a
a
s
N
W
It
U)
0 �
J
C
N
m
N LOA
C
Cl)
U)
CO M� et
L() LO LO Ln
Ln
(Dti
NCO
COO
O
N
CO

LO LO U) U) (O

N N N N N N N N N N
O CO w CD co CO CD (D
M
M
N
\
It
T
0 P-
OD
N.

Cl) It
h M
()
IT
CO (D
It It It ItI-T �IcT �qqt
o0
N
T
It
N
�
I-
It
�
M o
Cl) N
LO
v rn
M (D
0 0
T
T
U
0 Cn
COof
Q
w
U)
d U
z w
w❑ z
w U
ii CO
W
w U
EE a
D J
w ft
U d
D
z
Z
of
W
CO D
Z) Q
9 O
z
z J
Q0LL
J
00 Lr)
T
LO
Lf) CD
0 00
0 0
0 0
CN 0
0 CD
c0 c\D
T T
(0 <D
T T
r T
T
Nt �
0 0 0 0

T T T T
Cn
Z
w
z
J
W
U
2 J
w
M
O 0
(D 0
z W
J 2
LO �
0 0
0 0
0 0
r T
T
r (D
(O T
tt M M
OMO O) a)
N 000 000
n CM Cl)
U
J
0 Z
W
z
0 H
D CO
U) C
z 0
a a
0 J
W
Z O
LOn coo
0 0
0 0
T T
T T
LLO U) Lf)
0 0 0 0
T r r r
N
T
x
w

ti
tt (o 000'ch0000000 00 w r` P. O O O O Ln N I'- > w wwUa� ZUn.

P OC99q(9 (?(p z a � a m U) m U)cn�af-0 M
i s �.I J -I j J J J U Ur ❑ W W I' Q' w' W U a u- Z)
Q ¢QQQQQ¢ z O V VLL W ww0(n=U)Ocn
O w0C7C7d00d Q m O 1 H a U w0mU
w JWwwwwwW D LL LL LL QQ ¢¢LLV)CaLLC7
J JJJJJJJJ �- a O O > ��
U UUUUaUUU a a a a s a (LmWw0cOfaaft
0 OD
Ln
Ln
0 't
Lo -,*- (o ;r N r'- Lc) (D'T
t
mw N0U)(prN
O
r m O 0 o o 0 0 0
00 00N0404NNNN04
N
M
m
ocor`P-rr--r-r`r-
r N O (O co(O w CO CO
�,
N
00 r�
O
r
M

M N N N N N N N N
• C
Co
NM'tr-00Cl) V,Ln
0 O
O
0 O
0 N
O
M
O

M C V M M M M M M M
OOOOo0000
C
M
MMMMC'Jg44-
N
(O
Ln
Ln
00 O
O
OOo0000C)
O
00 00 M M W OD co O0 00
N
C
V*
N
CM
J

J J J J J J J Q Q
(�
M
M m M co M co (`') CM
0 O
O
W
(0
M
cM m Cl) m M Cl) Cl) -It 'IT
N

N N N N N N N N
r
N
m
M
co
('M
O
O r r r r r r r r
l:J
d
W
Cl)
~
uj
O
<
W
J
~
Q
J
Cl)
O
W
N
z
W
z
�
a
p
Q
O
O
w
z
O
H
m
z
LL
O
LLI
Oa
ui
C7
W
C)
Q
cii
�-
C)
Ix
O
LL
w
w
z
O
Q
W
LL
a
J
J
i
Q
O
a
a
O
a
o
-
o
o
v
0 r
m
00 m
(0
0 co
P-
o
00 ccJD
't
—
0 0
0 0
0 0
o
0 0
N
N
N
N
N
N
N
N
O
N
O
N
N
N
N
N
N
N
to
to
(o
co
CD
C0
C0
c0
M L
In m
m 00M CO Mr
r
m m m m 0 0
00 W W OD 00 00
r r r r r r
Ln
N

co
I
C
•"

N O N N

LO O LO LO
C*
(0
r 0
r- r- r
O
LO
O
Lf)
O
O
O
O
O
O
O
O
M
LO
M
w
00 00
LO M
0 w
N
N
O O
O

O LO O O
I- T L` LO
M
N
00 00 r
T T W
O
LO
O
Ln
O
O
O
O
O
Ln
O
Ln
CC
r
LO
0 r
LO
O
It
LO
w
IV
CO
Cb
00 N
6; CO
O
M
O
Cif
N
Ln
N
Lf1
O O
O O
Q
T G%
T
r
O
01 O
T
T T
r co)
N
LO
N
lO
O
O
O
O
T r
M M
O
r
O
�
r
r
w
}
r
FW
w
0 w
�
¢
°w
0 4
w
-
f-
FO
0 w
W w
J
LL U
2 V
U)J
W
O
LZL1
z
C
a d w
w
w W
Q
❑ IL
d
J
d
}
Q
=
m
Q Q
o
of
w
¢
n
z z
�
chi)
ccoo
Z
U)
cn cn cn
¢
F-
F—
vi
cn
cn
d
UUU
❑
❑❑
❑
❑
❑
U
U
U
O
Q
U
aw
a
a
0-
of
a
Of
ir
>
U
af
0 n
O
M

N L- LO
r'
co LO 0
O O CD
N
T
N
N N N
O
O
Cl)
N_
N 0 CO CO
M M
N
Cl)
M
CN
O
_
N
C CO
N Cl)
000
NO
O
co
Cl)
co
00 O Q Q Q
LO
LO LO
U
U
co
U
m
LO
p
0 Cp oD
O
v
Q
Q
Z
LO
LO
CD
co
C
r
T
N
ti
00 U)
m
U
J
J
a:

O
O
H U
H
�
Q
D
w
U
w
Z
W
w
zZ
Z Q
W
J
w
2 U
J
9 w U
w
z
O
O
0 O
¢
O_
ei
L
U
O
O
❑
�
Z
OU
U-
z
z
fn
z
O
06 H
0 H
o
O
O
w
H
U)
>
X
2 2
w U)
W
J
H
0 00
r
00 00
0 T
M
T
qt O
co
M
ar0
Cp
0)
000
ClLOO
�
01 00
0 co
N
0 CD_O
O
CD
O
O
O
O
O
O
O
O
O O
I-T
It
It
It
It
It
It
+4)'
O
O
CDO
O
O
O
O
O
O O
0 cli
N
N
N
N
N
N
N N
0 0
0 CO
0 0
0 0
T
T
r
T
r
T
T
T
r
T r
COO CTD (NO CCDD (D CIt OD (D

O O O O O O O O
00 00 00 OD 00 co 00 00
00 00 00 00 co OD 00 00
r T r r T
00 cr)
t-
OD co
0 OD
T r T
0 N

C17
Q
LO
LO
LO
CD
L[]
LO O
LL)
w
O
Cl O
LO
Lo
00 co
M
M
00 O 00 w
LLB
=
eM
Cq O N
O
O
h
O 1�
�
� N
O)
at
O
O O
�
it
tt
k
�
V.N
N N ti
U
O
O
O
O
0 .O
1 1
NN
JaCO
~
COC..

Z
0 O
-CO
1O
O
1 ~.O�.

N N0.
,
00 o
w
W
U
W
U
U
U
Z
W
W
N
O
N
r
O Cco C
N N A
W
o
06 ad
C
N
m
Q
2 V
U
U
H
H
g
>
CO
Q
W
W
a
N
o
vi
r
Z
_
w
Cn
Cl)
O
O
Y
U
O
U
N
~
a
U
U U
N
W
>
H
Y
>
r
C�
C� v)
a"-
J
CO
¢
J
¢
J
>
>
w
tri
U
��
U U
a
J
Q
H
=
Q
Z
W
U)
zai
a
0 0
F-
Ix
W
U)n
e
0 w
W
0 00
Uvv
v
oo

Z
>
J
W
co
g
m
Q
0 U
w
W
U
W
W
0 O
I-
C�
U
w
0 0
Y
Y
Q
Z
In
Q
>
¢
a
Z
Z
a
w
m
Q
a
¢
H
Q
a
2 X
>
W
J
H
H
j
D
>
>
L
O
M
N
0)O
d
O
O
0 CO
C~D
1-V)
�
�
�
(A
M
C
O
0 d
N
0 t0
Ll7
O
CD
CD
cn
N
O
0 0
0 0
0 0
0 0
0 0
N
N
N
N
w
N
N
N
N
N
N
m
Cl
O
O
O
N
N
N
N
N
N
N
N
N
N
0 0
0 CD
to
CAD
(0
C(D
w
0 � Cl)
d LO (O
00 W 00 00 00 00
CD 0) M CD
O W co O
00 tl0 O O
r-
N

O
E
ti
N
N
Gf
t0
M
fp
a
N
L
Qf
Z
:i
3 O
R
C
H
O
V
a
�
o
c
oc
a'
Q
.L
0 a
W
C'
z
O
a
z
W
N
J
�
0 Q
�
J
m
O
v
C
—
OC
a
u'
O
F
V
co
N
F
N
W
W
2 F
W
L
O
O
Y
z
m
Ci
N
Q
r•
o
a
O
N
E
T
O
U
=
N
N
co
CD
4)
•B
V
m
L
d
>
W
U.

N
z
~
L
d
t
co
X

CITY OF BELL GARDENS

OFFICE OF THE CITY MANAGER
f b.

AGENDAREPORT
Item 4.

TO: Honorable Mayor and City Council Members
FROM: Michael B. O'Kelly, City Manager
BY: Manuel Carrillo, Director of Finance & Administrative Services SUBJECT: WARRANT REGISTER SUCCESSORAGENCY
DATE: February 12, 2024
RECOMMENDATION:

It is staff's recommendation that the Successor Agency Members receive and file the warrant register dated 01/16/24.

BACKGROUND/DISCUSSION:

The attached warrant register is for 01/16/24. The warrant register reflects the obligation of the Successor Agency to the Community Development Commission (Successor Agency) for the above referenced date.

CONCLUSION:

If the recommendation to the Successor Agency Members is approved, then the warrant register dated 01/16/24 will be received and filed.

FISCAL IMPACT:

Warrant register 01/16/24 12941 $26,183.80
Total Voucher $26,183 80
................................................................................................................................Grand ....Total
...Vo.$6,
u.c.h.e.r...............................2.....1..83.8.0 ATTACHMENTS:

EXHIBIT-1 WARRANT REGISTER
APPROVED ELECTRONICALLY BY:

Michael B. O'Kelly, City Manager
Stephanie Vasquez, City Attorney and/or Susie Altamirano, Assistant City Attorney Manuel Carrillo, Director of Finance and Administrative Services 29 0
Co
40 40
So
65 Go
Go
vi
C-3
vi
v
E0
00 co
Go
co;
—
(6
v-
(a
CN
N
04 C4
01 0
Q
co
.
m
04 -lid
0 0
>
IS
0 W
0 z
LU
0 0
CL
(D
w
_j
O
LU
U)
-j
4)
-J
04 -J
O
"t
>
00 UJ
r
Cl)
co
CN
LL
0 rr
LU
0 z
0 z
0 0
(3)
L)
C14
Q
C14
Q
M
IL
(0
0 0
0 Q
19 cr,
C
CvI)
F
0 4)
LLo
C4
O
0 c
0)
P.

CITY OF BELL GARDENS

OFFICE OF THE CITY MANAGER
f b.

AGENDAREPORT
Item 5.

TO: Honorable Mayor and City Council Members
FROM: Michael B. O'Kelly, City Manager
BY: Manuel Carrillo, Director of Finance and Administrative Services Andrew J. Tse, Human Resources Manager
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BELL GARDENS,

CALIFORNIA, UPDATING THE CITYWIDE CLASSIFICATION AND COMPENSATION

PLAN AND APPROVING A BUDGET APPROPRIATION TO ESTABLISH /AM END STAFF

POSITIONS IN THE COMMUNITY DEVELOPMENT DEPARTMENT FOR THE

IMPLEMENTATION OF THE RENT STABILIZATION AND TENANT EVICITION PROTECTIONS PROGRAM AS ESTABLISHED BY ORDINANCE NO. 925 DATE: February 12, 2024
RECOMMENDATION:

It is recommended that the City Council:

1. Establish the positions of Housing Specialist 11, Housing Programs Supervisor, and Housing Inspector/Code Enforcement Officer;

2. Amend the title of Director of Community Development to Deputy City Manager / Director of Community Development;

3. Update the job specification of Housing Specialist to reflect updated chain -of -command; and

4. Adopt the attached Resolution establishing the salary range of the newly established positions and reflecting recommended position title amendments.

BACKGROUND/DISCUSSION:

On September 12, 2022, the City Council of the City of Bell Gardens adopted Ordinance No. 925, adding Chapter

5.62 "Rent Stabilization" and Chapter 5.63 "Tenant Eviction Protections" to Title 5 of the Bell Gardens Municipal Code (BGMC). The Ordinance became effective on October 12, 2022, establishing the City of Bell Gardens' Rent Stabilization and Tenant Eviction Protections Program (RSTEP).

City staff conducted a Request for Proposal (RFP) on November 14, 2022, to solicit proposals from qualified firms to prepare a required cost study identifying appropriate resources, including staffing and software, to successfully implement the RSTEP program.

On April 10, 2023, the City Council selected Revenue and Cost Specialist, LLC (RSC) to conduct the cost study of the implementation of the program. As a part of the study, RCS interviewed several jurisdictions with rent stabilization programs to determine prevailing industry processes and best practices pertaining to the RSTEP such as staff duties, registry protocol, technology solutions, and any startup issues. RCS then applied the findings and analyzed the City of Bell Gardens' data to formulate proposed program implementation and staff needs. Staff reviewed RCS's recommendations and established the proposed positions within the City's organization and compensation structure for the City Council's consideration. 31 On September 25, 2023, the anticipated cost study was presented to the City Council for consideration. The Council voted to adopt the cost study with the "Best Practices" recommendation.

The proposed Housing Specialist I I position assists with the implementation of the RSTEP program and provides assistance to residents seeking programs such as rental assistance, first-time home buyer assistance, and housing rehabilitation assistance. The incumbent will also be responsible for the coordination of consultants assisting with the administering of the housing programs, and ensuring communication with the public via social media, workshops, etc.

This position is distinguished from the Housing Specialist I position based on the number of years of experience, as well as supervisory role in the absence of the Housing Supervisor as needed. The recommended salary range for this position is G255, $5,688-$6,914.

The position of Housing Programs Supervisor is responsible for overseeing daily operation of the RSTEP, as well as assisting with other programs administered by the Community Development Department as assigned by the department director. The Housing Programs Supervisor is also responsible for developing and making recommendations in the areas of housing, affordable housing, and rehabilitation. The position reports directly to the department director and exercises supervision over the Housing Specialist 11, Housing Specialist I, Housing Inspector/Code Enforcement Officer, and Office Assistant. The incumbent may be assigned acting duties in the absence of the department director. The recommended salary range for this position is M173, $7,180 - $8,727 per month.

It is recommended that the position of Housing Inspector/Code Enforcement Officer be established utilizing the existing allocation for the currently vacant Code Enforcement Officer position, resulting in the reduction of one Code Enforcement Officer position, and adding the position of Housing Inspector/Code Enforcement Officer. This position's focus would be specifically on enforcement activities of RSTEP. The incumbent would be expected to assist with other Code Enforcement activities as directed. The salary range for this position would be the same as the existing Code Enforcement Officer position.

The job specification for the position of Housing Specialist I currently reflects that the position reports directly to the Director of Community Development. It is recommended that the job specification be updated to reflect that the position reports to the Housing Programs Supervisor as proposed for consideration.

It is also recommended that the title of the position of Director of Community Development be amended to Deputy City Manager/Director of Community Development. The Director of Community Development with the Deputy City Manager designation would serve as Acting City Manager in the absence of the City Manager. This amendment also takes into consideration the expected significant public contact and outreach for the position in association with the RSTEP program and newly created Housing Division. There is no request for an amendment to the existing salary range.

CONCLUSION:

The adoption of the resolution will result in the City's ability to properly implement and operate the Bell Gardens Rent Stabilization Program as established by Ordinance No. 925 and the adopted cost study as required by law.

FISCAL IMPACT:

It is recommended that the City Council appropriates $150,000 for the Rent Stabilization Program for the remainder of Fiscal Year 2023-24. Staff will make recommendations for appropriations for Fiscal Year 2024-25 during the normal annual budget formulation process.
32 ATTACHMENTS:

Exhibit 1 - Resolution No. 2024-06
Exhibit 2 - Housing Specialist I Job Specification
Exhibit 3 - Housing Specialist I I Job Specification
Exhibit 4 - Housing I nspector/Code Enforcement Officer Job Specification Exhibit 5 - Housing Programs Supervisor Job Specification Exhibit 6 - Deputy City Manager/Director of Community Development Job Specification APPROVED ELECTRONICALLY BY:

Michael B. O'Kelly, City Manager
Stephanie Vasquez, City Attorney and/or Susie Altamirano, Assistant City Attorney Manuel Carrillo, Director of Finance and Administrative Services 33 RESOLUTION NO. 2024-06

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BELL

GARDENS, CALIFORNIA, UPDATING THE CITYWIDE

CLASSIFICATION AND COMPENSATION PLAN AND APPROVING A

BUDGET APPROPRIATION TO ESTABLISH / AMEND STAFF

POSITIONS IN THE COMMUNITY DEVELOPMENT DEPARTMENT FOR

THE IMPLEMENTATION OF THE RENT STABILIZATION AND TENANT

EVICITION PROTECTIONS PROGRAM AS ESTABLISHED BY
ORDINANCE NO. 925
WHEREAS, Section 3.01 (Preparation and Adoption) of Chapter 3 (Classification) of the City of Bell Gardens Personnel Rules and Regulations requires that the Personnel Officer (City Manager or designee) prepare and maintain the Classification Plan which shall consist of those classes of positions in the City service as approved by the City Council in adopting, amending or revising the plan;
WHEREAS, Section 3.05 (Request for New Classification) of Chapter 3 (Classification) of the City of Bell Gardens Personnel Rules and Regulations requires that upon request of the Personnel Officer (City Manager or designee), a department head provide information pertinent to class specification when requesting a new classification to be created;
WHEREAS, Section 3.08 (Class Allocation) of Chapter 3 (Classification) of the City of Bell Gardens Personnel Rules and Regulations requires the City Council to approve the new class specifications;
WHEREAS, the Human Resources Manager as designee of the Personnel Officer (City Manager), recommends that certain organizational and administrative updates to the Classification Plan be made, effective as of February 12, 2024, (except where otherwise indicated) for the implementation of the City's Rent Stabilization and Tenant Eviction Protections Program (RSTEP); and
WHEREAS, an additional budget appropriation is needed for the personnel budget for Fiscal Year 2023-24 for the purpose of establishing the added positions of Housing Specialist II and Housing Programs Supervisor within the Community Development Department of the City of Bell Gardens.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Bell Gardens as follows:

SECTION 1. The City Council of the City of Bell Gardens hereby finds that the above recitals are true and correct and incorporated them herein by this reference.

SECTION 2. The City Council hereby adopts the Citywide Classification and Compensation Plan as enumerated in Attachment "A", effective February 12, 2024 Exhibit 1 1S47

Resolution No. 2024-06
(except where otherwise indicated), which includes the addition of the positions of Housing Specialist II and Housing Programs Supervisor, and the amendment of the job specifications of the positions of Housing Specialist I, Housing Inspector/Code Enforcement Officer, and Deputy City Manager/Director of Community Development.

SECTION 3. The City Council hereby appropriates $150,000 for the implementation of the Rental Stabilization and Tenant Eviction Protections Program for the remainder of Fiscal Year 2023-24.

SECTION 4. The Rental Stabilization and Tenant Eviction Protections Program revenues are expected to offset the allocation granted by this Resolution.

SECTION 5. The City Clerk shall attest and certify to the passage and adoption of this Resolution and enter it into the book of original resolutions, and it shall become effective immediately upon its approval.

PASSED, APPROVED and ADOPTED this 12t" day of February, 2024.

APPROVED AS TO FORM:

Stephanie Vasquez
City Attorney

THE CITY OF BELL GARDENS
Jorgel Chavez, Mayor
ATTEST:

Daisy Gomez
City Clerk
Exhibit 1 2A7

Resolution No. 2024-06
I, , City Clerk of the City of Bell Gardens, hereby CERTIFY that City Council Resolution No. was adopted by the Bell Gardens City Council at a regular meeting of the City Council held on and was approved and passed by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

Daisy Gomez
City Clerk
Exhibit 1 3A7

Resolution No. 2024-06
Attachment "A"
Exhibit 1 4:y�7

le
N
N 't
LL O
L
N
co
co
co
co
co
co
co
CM
CM
CM
CM
co
co
co
co
co
N
N
N
N
N
N
co
co
c•M
N
N
c•M
N
N
N
N
N
N
c•M
N
N
= 0O
m
N
O
N
O
N
O
N
O
N
O
N
N
O
N
O
N
O
O
N
O
N
N
O
O
N
O
N
O
N
O
N
O
N
O
N
N
O
O
N
O
N
N
N
N
N
N
cm
cm
cm
cm
cm
cm
ti
ti
ti
cm
cm
ti
cm
cm
cm
cm
cm
cm
ti
cm
cm
W
U)
00 U)
ti
�
IZT
M
O
00 U')
U')
N
�
co
I�
�
'T
co
NT
ti
ti
ti
ti
N
N
N
CO
U')
LO
ti
CO
N
CO
Q,
CO
U')
co
co
co
co
CM
CM
CO
�
m
m
O
ti
NT
ti
I-
d
O
u
u
u
u
N
N
N
N
07 cO
CO
CO
L
cO
r-
00 CO
U)
N
N
6Q�
6Q�
6Q�
6Q�
6Q�
6Q�
6Q�
6Q�
6Q�
6Q�
6Q�
0 U')
CO
O
CO
N
N
N
U
N��
O
N
co
co
O
c•M
N
�
00 N
O
M
M
M
M
N
N
CO
CO
CO
CO
Q,
..
00 ..

D7
..
00 ..

CO
..

CO
..

CO
..

I�
..
..
ti
..
ti
..

CO
CO
00 O
M
m
O
O
't
't
�
..

M
..
co
..

CO
..

CO
..

Nt
..
co
..

I,-
..
0o
..

CO
U
U')m
't
't
Nt
co
N
CO
CO
0o
0o
CD
co
I�
CO
co
I,-
co
00 N
't
't
Nt
I-
m
I-
I-
co
N
CD
CD
CD
U)
N
U)
Q,
N
00 cf
D7
m
D7
Cl
Cl
ao
cM
cM
CO
I�
O7
00 m
O
't
co
co
CO
O
CO
U')
co
CO
Nt
co
CO
I,-
CO
m
O
I-
CO
CD
O
O
D7
ti
ti
M
ti
M
M
O
m
00 U')
00 00
00 CO
co
CDCD00
CD
co
Q,
00 00
�
N
N
N
cO
Ili(O
CO
�
�
O
O
m
00 "T
U-)
00 I-
00 m
co
co
co
co
CD
CD
CD
CD
co
U')
co
CO
�
L
CO
r,
Ldl
Q
t
CO
0 CO
�
I-
I-
I-
I-
CD
I-
I-
00 m
N
CDN
CD
O
N
I-
M
't
Nt
co
I,-
co
co
N
I,-N
N
I-
00 CD00
00 Q,
cM
�
D7
�
ao
CO
CO
CO
D7
,
N
ti
ti
-
Lf
-
-
Lf
d
N
CO
I-
m
N
N
N
N
O
m
O
O
00 U')
U')
U')
NtU')
co
I-
U')
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
d
00 I�
qT
M
L
cO
CO
CO
D7
00 cO
D7
N
O
O
O
N
CM
Cf)
qT
O
00 D7
00 00
00 00
00 00
00 ti
00 00
L
ti
ti
L
CO
CO
I�
L
U
d
O
N
N
N
N
N
N
N
N
N
N
N
N
N
N
w��7-5
75-
75-
75-
7 >-
7>
7 U
7>
7 v
U)
cn
N
O
O
L)

uj
co
i
�V)
QL
cNu
cNu
U
4)
Cl)
�
Cl)
a)
r
c0
'
(
N
cn
cncn
QO
cn
c<>0
U
N
LL
O
-lZ•U
>
c
c
Q
O
>+
(6Q
-,z
'E
O
O
O
NL
O
=Q
4)
c0c0
cu
c0
O
>
LL
O
O
c0
�—NN
Q
GOL
j
4-
U
E
O
co
o
E
O
O�
i
>+
cn
cn
:t:

Q
a) O
O
Vcn
U
cn
:t:
�
N�
X
N
X m
n
m
m
E
N
N
U
QUCUC)
n
C
C
Q
Q
U
w U
w 7
_
75 0-
(n
0-
O
O
c6
O2
N N
ch
z
0 N
cn
Q
N
L
to
i0) CD-r_
N
Q
Q
X c0 N
c0 Q
4— N
w o
C
o
�_ U�
U o
z
7-5
z
x
w

le
N
N 't
LL O
L
N
N
co
L
LL
Q
O
cu
co
N
O
N
L
cu
LL
W
NN�
I..L
d
>
co
co
co
M
M
M
M
M
M
M
'IT
CM
'T
NT
CM
co
m
m
m
co
co co
co
co
co
co
co
co
c'M
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
c'M
N
N
N
N
N N
N
c'M
N
N
N
N
++ J
t� m
N
O
N
O
0 N
0 N
0 N
0 N
O
N
O
N
O
N
O
N
O
N
O
N
O
N
O
N
O
N
O
N
O
N
O
N
N
O
O
N
O
N
O
N
O
N
O O
N N
O
N
N
O
O
N
O
N
O
N
O
N
I�
ti
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
N
CO
N
N
CO
CO
I�
CO
CO
CO
CO
CO CO
CO
I�
CO
CO
CO
CO
W
NCO
N
Cf)
LO
CO
CO
NT
NT
U')
CO
"T
M
"T
I-
N
Ln
CO
LO
CO
N
M
LO
N
M
I-
CO
CO
O
I�
ti
ti
O
Lf)
Lf)
I�
CO
00 CO
�T
M
N
�T
CO
M
CO
�T
ti
LO
r—
N
�T
CO
O
Q,
O
Lf)
N
O
O
CO
Lf)
N
Lf)
O
co
00 Lf)
-
O
ti
N
N
Lf)
co
Lf)
N
00 I� O
O
NT
ti
00 co
Lf)
Lf)
00 r-
ti
07 Lf)
'
CO
CO
Lf)
Lf)
CO
CO
CO
00 CO
CO
'
Lf)
'
CO
'
Lf) CO
Lf)
CO
00 Lf)
'
Lf)
0 O
O
00 m
ti
cM
O
co
O
Lf)
m
00 O
N
U')
N
Lf)
I�
0o
m
0o
Lf)
CO
m cM
O
N
N
0o
D7
ti
co
I�
CO
I�
00 CO
I�
00 N
CO
I,
CO
T
�
NT
N
NT
�
CY) N
CM
CO
CM
Q,
00 M
00 CO
Lf)
cM
cM
O
N
Lf)
Lf)
N
Lf)
cM
O7
m
c'M
�
CM
O7
Qc
� CO
00 —
cM
Lf)
O7
O
..

NT
..

Lf)
..

I�
..

CO
..

I�
..
m
..

Lf)
..

NT
..

CO
..

CO
..

Lf)
..

Lf)
..

CO
..

CO
..

CO
..
00 ..

Lf)
..

Lf)
..

NT
..

Lf)
..

NT
..

Lf)
..

NT
.. ..

Lf) CO
..

NT
..

CO
..
00 ..

Lf)
..
co
..

Lf)
Q-,
Qf,
V),
V),
V),
V),
6Q}
6Q}
6Q}
6Q}
6Q}
6Q}
Qf l
Qf l
Qf l
Qf l
Qf l
Qf l
Qf l
Qf l
Qf l
6Q}
6c} 6c}
6c}
6c}
6c}
6c}
U
O
CO
M
N
CO
CO
00 m
N
LO
CM
N
CO
"T
—
LO
—
—
"T
O CO
O
CO
CM
CO
O
U')O
U')
cocM
U')
CO
I
ti
0o
O
I�
NI-
N
CO
CO
�T
00 T
CO
N
0o O
O
N
O
LO
O
Q,
CO
O
Lf)
co
N
D7
O
00 D7
N
00 co
D7
00 N
D7
CO
CO
00 CO
M
CO
00 m
cf)
I-
00 0
..
4 ..

Lf)
..

I--
..

CO
..
r-
..
00 ..

Lf)
..
co
..

Lf)
..

CO
..
4 ..

Lf)
..

Lf)
..

Lf)
..

CO
..
r-
..

Lf)
..

Lf)
..

Nt
..

Nt
..

Nt
..

Lf)
..

Nt
.. ..

Lf) CO
..

It
..

Lf)
..

I�
..

Lf)
..
cr
..
in
6Q�
m
I-
Lf)
M
CO
O
I-
Lf)
I-
co
N
O
I-
�
co
m
N
�
�
N
'
N
't
CO I-
�
t
M
O
CO
I-
00 I�
00 00
I,-
Lf)
Lf)
00 Nt
ti
M
M
M
t
Lf)
�
M
M O
00 t
M
Lf)
I-
I-
Q,
cr
ao
O
CO
Lf)
0o
CO
CO
D7
co
O
CO
Lf)
D7
Lf)
M
M
D7
Qc
D7
cr
N
D7 O
M
Lf)
Lf)
O
Lf)
Lf)
ti
CO
CO
00 co
U')
U')
"t

U)U')U')U')
I-
U')
U')
co
Nt
co
U')
i
i CO
4 U)I�
U)
co
Nt
Q
N
CO
U')
U')
00 O
CO
CO
O
CO
M
00 CD
U)
I-
CO
CO
U')
CO
I-
N
M
CD
CD
CO
M
I-
00 CD
(O
Nt
O
CO
CO
CO
I-
CO
CO
CO
CO
U')
CO
U')CO
M N
I-
I-
CO

CDU')Q,
U')
CO
I-
U')
U')
Nt
co
Nt
0o
�
N
CO
I-
�
I-
CD
CO I-
N
CO
�
CO
4)
CO
Lf)
CO
00 i
C
Lf)
Lf)
i
�
Lf)
Lf)
I-
Lf)
C�i
't
�Lf)�Lf)r,
�C
�E9'E9'E9'E9'E�'
V/
E�'
E�'
E�'
E�'
Q�l
Q�l
I
Q�l
E�'
E�'
IM
E�'
E�'
E�'
I
E1)'
E1)' E1)'
E1)'
E1)'
E1)'
Q�l
Q�l
Q�l
i
i
2:1
21 2:1
21 2:1
i1
i�
i�
i
i�
2:1
21 i%
21 2:1
21 i%
_
_
_
_
_
_
_
_
_
_
(Q
H
O
O
O
O
O
O
O
O
O
O
O
cc
G
cc
G
cc
G
cc
G
cc
G
cc
G
cc
G
cc
G
cc
G
cc
G
cc
G
ccO
G
ccO
G
ccO
G
ccO
G
ccO
G
ccO
G
ccO
G
ccO
G
ccO
G
ccO
G
ccO
G
ccO
G
ccO ccO
G G
ccO
G
ccO
G
ccO
G
ccO
G
ccO
G
ccO
G
O
D7
qt
D7
LO
D7
O
M
Lf)
O
M
LO
co
O
N
ti
CO
c'M
I�
Nt
co
Nt
0 0
t
CO
Lf)
Lf)
I-
Lf)
Lf)
Lf)
Lf)
Lf)
Lf)
Lf)
I-
Nt
Lf)
Nt
Lf)
It
"t
't
Lf) CO
It
Lf)
I-
Lf)
Nt
Lf)
ULf)
d
N
N
N
N
N
N
N
N
N
N
N
N
N
N—
N
N
N
N
N
N
N
N
V!
L
L
cu
Ocu
cn
:3
L
L
U
70 U
L
Q
_
m
U
U
N
O
L
��
4 O
N
O
U
i
O L
^—
LL
L)
m
Q
°)
O
O
cn
L
�
0 4-
c6
.7
O
c
cu
cn
U
_cu
U
N
cn c0
EE
�
c6
c6
�
—
O
_
c0
•
Cl)
R
U
U
0 0-0
co
c
O�
0cn
Q
cu
0 _�
cn
O
�UV)
OO
y--•
a
J U
.�
O
O
"=
N
a-
Q
U
U
"-
U
U
c6
a
U�
4)
(n
(n
(n
Q
O
to
cu
\
'� '�
O
cu
cu
c6
cn H
�+
W
W
:
�_
�_
�
�_
�_
Q
0 -2
cn
-a
c0 M
—CU
—CU
Q
L
(n
L
f—
L
O
O
O
U
O
1 N
N
�•
(�
cn `-
in
in
in
(n
p
O
N N
N
N
0 0
0 U
U
Ucn
.)
cn
.�
N
O
O
'�
.�
U
Y
m
N
N
N N
N
N
N
N
N
O
N
O
O
O
O
"
Q
Q
Q
Q
Q
(D
(0 �
U
U
U (D
U
= W
=__
Z
O��
W
W W
(n
(n
(n
(n
H
(n
O
Q
W
U
�U
O
O
Cl)
Q O
cn
F= =
Q.

W .v
O
cn
L
cn
U Q
C�
w

le
N
N 't
LL O
L
N
J.,
co
N
O
co
N
O
co
N
O
m
N
N
N
W
co
co
co
W
co
COo
m
Q,
CO
m
'
N
Ln
U)
61),
61),
61),
�
04 N
I�
c0
-t
-t
U
CD
CD
Ln
co
m
Nt
m
O
Q
I-
00 m
Q,
N
CD
>+
:1
d
O
Lo
U
d
�
U
U
U
//U
V^
!
O
N
O
m
m m
i U
cu
m
O cu
O N
CU
CU
� � o
C
J (n
O
W
m
In
Y cn ^�^
O LL
O
O
Q
U Q
Q.

E . LU
W 0
acn
O
cn
co
co
co
co
co
co
M
M
M
M
M
M
co
co
co
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
O
O
N
N
N
N
N
N
N
N
N
N
N
N
N
I�
O
O
O
N
N'T
NT
LO
N
�
CO
CO
N
U)
O
N
00 00
NT
N
co
O
co
CO
Il
CO
O
co
NT
Cf)
m
rl
O
ti
CO
00 O
O
CO
cl
(f}
(f}
(f}
(f}
(f}
(f}
N
N
N
N
N
N
O
N
O
N
O
N
O
N
O
N
O
N
Ln
CO
I-
co
N
N
NT
co
m
0o
I,-
NT
O

U')CDNT
CD
U')
O
O
O
O
O
O
O7
Ln
O7
CM
cM
I�
M
CO
ao
ao
M
c0
c0
c0
0 CO
m
co
CO
0o
0o
m
U')N
CD
0 O
O
O
O
O
O
O
O
O
O
I,
00 co
co
M
CO
CO
N
co
NT
O
O
CO
CO
CO
O
O
O
O
O
O
CO
CO
O
D7
CM
r-
00 00
N
N
00 "'
io
CO
D7
CO
CO
I�
00 00
O
N
O
O
O
O
O
O
O
Q
ca
Q
ca
Q
ca
Q
ca
Q
ca
Q
ca
I�
O
m
N
N
Lf)
00 O
O
O
O
"T
00 N
LO
m
O
m
D7
LO
�
m
m
Q
Q
Q
Q
Q
Q
cM
CO
cr
I�
O7
N
N
CO
I�
N
—
—
—
—
—
—
CO
00 CO
Lo
I�
ti
00 O
q
D7
O
6Q}
6Q}
6Q}
6Q}
6Q}
6Q}
6Q}
tf}
O
O
6Q�
.
.
.
.
.
.

O
O
N
N
,_
>
,_
>
,_
>
,_
>
,_
>
,=
>
N
N
N
N
Lo
00 Lo
N
I�
M
D7
ti
M
Lo
D7
O
M
D7
't
CO
I�
N
ti
ti
N
M
O
O
O
00 D7
M
O
N
N
O
O
N
O
S
Lo
00 O7
CO
00 t
O
M
00 V
V
V
V
V
C�
0 0
0 0
CO
00 00
CO
Lf)
I--
I--
m
I--
O7
O
Cl
O
O
v
v
v
v
,",O-_
",O-_
�
r_
6}
6}
�}
�}
�}
6}
6}
6}
6}
�}
�}
—
—
�}
Qf,
N
N
N
N
N
a)O
O
O
O
N
N
N
N
N
N
0 0
>+
>+
>+
>+
>+
C
C
C
C
C
_
C
_
C
C
_
C
C
C
_
C
C
_
C
C
N
N
N
N
N
N
O
O
(n
(n
0 0
0 0
N
N
00 D7
LO
CM
00 M
CO
cu
CO
I�
O
Op
O
O
Lo
Lo
CO
Lo
Lo
CO
CO
CO
I�
00 00
ti
ti
N
N
N
N
a)
a)cn cn
Q
CL
Q
Q
Q
0 Q
0 Q
0 Q
0 Q
0 Q
0 n3
n3
cu
O
cu
O
(0
co
N
N
N
co
co
co
co
cn
cn
U
U
U
U
U
U
Q
Q
(0
(0
O
I
L
N
L
L
Q
U)
U
U
N
Q
4-
�
O
cn
L
cn
L
C
O
00 c6
>
N
N
cu
Lo
cn
Q
Q
0-V
L
Q
U
~
cu
N
to
N
12 E
�
�
�(
cu
N
Q
E
__
to
to
L
E
>_
`J)U
U
O0aa
U
4)
amo0
Lcu
_>UJc/
N
O
.—cu
L
O
O
O
a)
O
O
U)
nM
U)
Q
�
a-
a-
nN
IV
N
Q
U)
^
^
Q
L
U)
L L3:

LO
N a
E�
M
'a
0)
_
cn
_
cn
o
o
U ..

N ..
cu
cn
p O
O
N
N
N
U N
Q
N c0
(6 75- 0N
Q'
Q'
QL
�
U U
U
L
Q
_
U
U)
U)
U)—
(n U
a
D O
V O
N
0)
0)
0)
cnQ
a Q
w
o
U)
CL
0 0
0 O
a))
0-
0-1
ol
0-
Z
0-
1 0
1 2
I 2
2 Date Adopted:: February 12, 2024

CITY OF BELL GARDENS
Housing Specialist I
Under the supervision of the Housing Supervisor and Housing Specialist II in the absence of Housing Supervisor, the Housing Specialist I coordinates and provides services and activities pertaining to the City's housing programs, including, but not limited to, implementation of a rent stabilization ordinance, rental assistance, first-time home buyer assistance, and housing rehabilitation assistance. Coordination involves working with consultants administering the housing programs and ensuring communication with the public via social media, workshops, and other duties as assigned.

The Housing Specialist I is a specialized professional/technical class assigned a variety of clerical and administrative duties relating to the Housing Programs administered by the Community Development Department.
(The following functions are typical for this classification. Incumbents may not perform all the listed functions and/or may be required to perform additional or different functions from those set forth below to address business needs and changing business practices.) • Plan and prioritize the services and activities of assigned programs within the Housing Division, including the rent stabilization ordinance, rental assistance program, Cal Home grant for first-time home buyer and housing rehabilitation assistance; duties will include being the liaison between the City's grant consultant, other resource agencies such as Stayed Housed LA and the Los Angeles County Development Authority (LACDA), and the public to ensure the public is receiving every opportunity to connect and receive available housing resources. • Establish schedules and methods for providing assigned services; identify resource needs; review needs with appropriate management staff; allocate resources accordingly.
• Participate in the development and implementation of goals and objectives as well as policies and procedures; make recommendations for changes and improvements to existing standards, policies, and procedures; monitor work activities to ensure compliance with established policies and procedures. • Develop procedures for new programs; develop and receive approval for policies and procedures to implement federal regulations and new programs; participate in development of new policies and procedures to improve service delivery. • Provide information and resolve problems with applicants, tenants, owners, and the public as needed; coordinate and participate in the preparation of newsletters and outreach material.
• Participate in the selection of assigned staff, including consultants; provide or coordinate staff training as applicable; identify and bring in consultants to conduct Exhibit 2 quality control audits of tenant files Niensure accuracy of staff's work.

• Participate in the preparation and administration of the assigned program budget; submit budget recommendations; monitor expenditures.
• Monitor program compliance with federal law and regulations; monitor application procedures and processes; recommend revisions to City ordinances related to housing assistance; analyze and implement federal, state, and local guidelines related to a future Section 8 Housing Program if the City were to create a Housing Authority.
• Perform other related duties as required.

Knowledge of:

Principles and practices used in housing assistance programs; needs assessment principles and techniques; counseling techniques; interviewing techniques; fraud prevention strategies; basic principles and practices of budget preparation and administration; principles and procedures of record keeping; principles of business letter writing and basic report preparation; office procedures, methods, and equipment including computers and applicable software applications such as word processing, spreadsheets, and databases as well as specialized housing systems; pertinent federal, state, and local laws, codes, and regulations.

Ability to:

Understand the organization and operation of the organization and of outside agencies as necessary to assume assigned responsibilities; apply housing assistance program knowledge in the assessment of service delivery, including development of policies and procedures to improve and streamline service delivery; understand, interpret, and apply general and specific administrative and departmental policies and procedures as well as applicable federal, state, and local policies, laws, and regulations; prepare clear and concise reports; participate in the preparation and administration of assigned budgets; plan and organize work to meet changing priorities and deadlines; effectively represent the Community Development Department/Housing Division to outside individuals and agencies to accomplish the goals and objectives of the unit; work cooperatively with other departments, government officials, and outside agencies; respond tactfully, clearly, concisely, and appropriately to inquiries from the public, staff, or other agencies on sensitive issues in area of responsibility; diffuse or intervene in threatening and emergency situations; communicate clearly and concisely, both orally and in writing; and establish and maintain effective working relationships with those contacted in the course of work.

These are position functions which may be changed, deleted or reassigned to accommodate an individual with a disability.

Exhibit 2 42

MINIMUM QUALIFICATIONS
Any combination of education, training and experience that has provided the knowledge, skills and abilities necessary for successful job performance. A typical way to obtain the requisite qualifications to perform the duties of this class is as follows:

Education/Training
Graduation from high school or equivalent and college level course work or specialized training in Public Administration, Social Services, or a related field; and four (4) years of responsible experience in a housing assistance program; a Bachelor's Degree is highly desirable.

Ability to speak Spanish is highly desirable.

License(s) / Certification(s)
Valid California Class C driver's license and acceptable driving record.

Physical Requirements
Work is performed in an office environment with several hours spent sitting and using a computer terminal or standing at the front customer service counter assisting service users. May require travel to attend meetings and conferences.

Exhibit 2 43

Date Adopted: February 12, 2024

CITY OF BELL GARDENS
Housing Specialist II
Under the supervision of the Housing Supervisor, the Housing Specialist II coordinates and provides services and activities pertaining to the City's housing programs, including, but not limited to, implementation of the rent stabilization ordinance, rental assistance program, first-time home buyer assistance program, housing rehabilitation assistance program, and other duties and programs as assigned. Coordination involves working with consultants administering the housing programs and ensuring communication with the public via social media, workshops, etc. This position is distinguished from the Housing Specialist I based on the number of years of experience as well as supervisory role in the absence of the Housing Supervisor as needed.

The Housing Specialist II is a specialized professional/technical class assigned a variety of clerical and administrative duties relating to the Housing Programs administered by the Community Development Department.
(The following functions are typical for this classification. Incumbents may not perform all the listed functions and/or may be required to perform additional or different functions from those set forth below to address business needs and changing business practices.) • Supervise Housing Division staff in the absence of the Housing Supervisor, as needed.
• Plan and prioritize the services and activities of assigned programs within the Housing Division, including the rent stabilization ordinance, rental assistance program, Cal Home grant for first-time home buyer and housing rehabilitation assistance; duties will include being the liaison between the City's grant consultant, other resource agencies such as Stayed Housed LA and the Los Angeles County Development Authority (LACDA), and the public to ensure the public is receiving every opportunity to connect and receive available housing resources. • Establish schedules and methods for providing assigned services; identify resource needs; review needs with appropriate management staff; allocate resources accordingly.
• Participate in the development and implementation of goals and objectives as well as policies and procedures; make recommendations for changes and improvements to existing standards, policies, and procedures; monitor work activities to ensure compliance with established policies and procedures. • Develop procedures for new programs; develop and receive approval for policies and procedures to implement federal regulations and new programs; participate in development of new policies and procedures to improve service delivery.

Exhibit 3 44

• Provide information and resolve problems with applicants, tenants, owners, and the public as needed; coordinate and participate in the preparation of newsletters and outreach material.
• Participate in the selection of assigned staff, including consultants; provide or coordinate staff training as applicable; identify and bring in consultants to conduct quality control audits of tenant files to ensure accuracy of staff's work. • Participate in the preparation and administration of the assigned program budget; submit budget recommendations; monitor expenditures.
• Monitor program compliance with federal law and regulations; monitor application procedures and processes; recommend revisions to City ordinances related to housing assistance; analyze and implement federal, state, and local guidelines related to a future Section 8 Housing Program if the City were to create a Housing Authority.
• Perform other related duties as required.

Knowledge of:

Principles and practices used in housing assistance programs; needs assessment principles and techniques; counseling techniques; interviewing techniques; fraud prevention strategies; basic principles and practices of budget preparation and administration; principles and procedures of record keeping; principles of business letter writing and basic report preparation; office procedures, methods, and equipment including computers and applicable software applications such as word processing, spreadsheets, and databases as well as specialized housing systems; pertinent federal, state, and local laws, codes, and regulations.

Ability to:

Understand the organization and operation of the organization and of outside agencies as necessary to assume assigned responsibilities; apply housing assistance program knowledge in the assessment of service delivery, including development of policies and procedures to improve and streamline service delivery; understand, interpret, and apply general and specific administrative and departmental policies and procedures as well as applicable federal, state, and local policies, laws, and regulations; prepare clear and concise reports; participate in the preparation and administration of assigned budgets; plan and organize work to meet changing priorities and deadlines; effectively represent the Community Development Department/Housing Division to outside individuals and agencies to accomplish the goals and objectives of the unit; work cooperatively with other departments, government officials, and outside agencies; respond tactfully, clearly, concisely, and appropriately to inquiries from the public, staff, or other agencies on sensitive issues in area of responsibility; diffuse or intervene in threatening and emergency situations; communicate clearly and concisely, both orally and in writing; and establish and maintain effective working relationships with those contacted in the course of work.

These are position functions which may be changed, deleted or reassigned to accommodate an individual with a disability.

Exhibit 3 45

MINIMUM QUALIFICATIONS
Any combination of education, training and experience that has provided the knowledge, skills and abilities necessary for successful job performance. A typical way to obtain the requisite qualifications to perform the duties of this class is as follows:

Education/Training
Graduation from high school or equivalent and college level course work or specialized training in Public Administration, Social Services, Housing, or a related field; and four (4) years of responsible experience in a housing assistance program; a Bachelor's Degree is highly desirable.

Ability to speak Spanish is highly desirable.

License(s) / Certification(s)
Valid California Class C driver's license and acceptable driving record.

Physical Requirements
Work is performed in an office environment with several hours spent sitting and using a computer terminal or standing at the front customer service counter assisting service users. May require travel to attend meetings and conferences.

Exhibit 3 46

Date Adopted: February 12, 2024

CITY OF BELL GARDENS
Housing Inspector / Code Enforcement Officer
Under the supervision of the Housing Programs Supervisor, performs the duties insuring community compliance of the Bell Gardens Municipal Code; focuses on compliance with housing law and programs; receive complaints; investigate and identify municipal code violations; take appropriate action related to the violations; keep an accurate record of all cases; perform field inspections; researches appropriate laws, codes, and regulations; work with the public at the counter; may also perform general code enforcement duties, as time and schedule permit, for the Building Services Supervisor; perform related duties as assigned.

The Housing Inspector/Code Enforcement Officer is a specialized professional/technical class assigned a variety of administrative duties relating to the Housing Division and Code Enforcement Divisions of the Community Development Department.

Investigate complaints involving violations of the City's Rent Stabilization and Tenant Eviction Protections Ordinance and all other housing programs as assigned; also, as time permits, investigates illegal uses of private property or public right-of-way such as noise, vehicle storage, sign placement, littering, zoning; address and resolve complaints regarding compliance with the enforcement of Zoning Code and other City Ordinances; maintain records of investigations conducted and actions taken; conduct field investigations; issue correction notices and orders to comply; prepare and compile documentation for prosecution cases involving municipal code violations and give testimony in court; inspects subsidized and rehabilitated housing conditions for conformity with state and local health and safety code requirements and regulations; researches appropriate laws, codes, and regulations in preparing recommendations for allowance or discontinuance of activities in question; interpret municipal code; maintain investigation files, record and log; meet with property owners to develop a plan to resolve violations; refer complaints and observed violations to proper department or agency for enforcement; enforce vehicle codes with respect to abandoned vehicles; issue citations; attends various City Commission meetings and provides information of ordinances, proposed changes, policies and procedures; research proposed ordinances as directed; prepare statistical and photographic reports on a regular basis to resolve zoning enforcement issues; perform related duties as assigned. Weekends may be required.

Knowledge of zoning and municipal codes; procedures involved in the investigation and enforcement of codes and regulations; the basic elements of public relations; the preservation of evidence applicable to enforcement work; privileges of Exhibit 4 47

confidentiality. Ability to conduct inspections, ascertain facts and apply appropriate codes; keep logs; write complex inspection reports; work independently; establish and maintain effective relationships with those contacted in the course of work, including other City staff and the public; communicate clearly and concisely both orally and in writing; understand and carry out oral and written instructions. Ability to understand and communicate in the Spanish language is highly desirable.

These are position functions which may be changed, deleted or reassigned to accommodate an individual with a disability.

Any combination of education and/or experience equivalent to perform the duties of this position. Examples of acceptable education and experience are graduation from high school or equivalent and three (3) years experience, or its equivalent, relating to interpretation and enforcement of municipal rules and regulations, complaints procedures, zoning enforcement, code enforcement or related field. Experience in housing code enforcement in a governmental agency or closely related field of an investigative nature is preferred.

A Bachelor's degree in Public Administration, Planning, Criminology or related field is highly desirable.

Ability to speak Spanish is highly desirable.

Licenses or Certifications
Valid California Class C driver's license and acceptable driving record.

Physical Requirements
Work is done in the field in the community performing enforcement duties. Work is also performed in an office environment with several hours spent sitting and using a computer terminal or standing at the front service counter assisting service users. May require travel to attend meetings and conferences.

Exhibit 4 48

Date Adopted: February 12, 2024

CITY OF BELL GARDENS
Housing Programs Supervisor
Under the supervision of the Deputy City Manager / Director of Community, the Housing Programs Supervisor is responsible for overseeing the daily operation of various programs, including but not limited, to ensuring the successful implementation of the rent stabilization ordinance, rental assistance program, first-time home buyer assistance program, housing rehabilitation assistance program, as well as engage in program development in the areas of housing, affordable housing and rehabilitation.

The positions assigned to this classification exercises supervision over the Housing Specialist II, Housing Specialist I, Housing Inspector/Code Enforcement Officer and Office Assistant. May act for the Director in his/her absence.

The Housing Programs Supervisor is a specialized professional/technical class assigned a variety of administrative duties relating to the housing programs administered by the Community Development Department.

The following tasks are essential for the positions assigned to this classification. Any single position may not perform all of these tasks or may perform similar related tasks not listed here.

1. Supervises the daily operations of the Housing Division.

2. Oversees the City's Rent Stabilization and Tenant Eviction Protections (RSTEP) Program and ensures compliance with all required documentation and processes, including rental business licenses, rental registry, fair market return applications, rental increase contesting, capital improvement applications, and all other related tasks.

3. Oversees the determination of eligibility of applicants according to program guidelines. Oversees the preparation of applications and the amount of assistance for various programs.

4. Manages the design, implementation and development of existing and new programs.

5. Trains staff, delegates work assignments, and prepares performance evaluations.

6. Reviews all files and inspection reports of properties in a variety of programs.

Assures such units meet applicable standards. May make property inspections for various programs.

7. Prepares and monitors Housing Division budget.

Exhibit 5 49

8. Maintains a current and thorough working knowledge of relevant guidelines, regulations and laws, including, but not limited to, RSTEP, HUD Section 8, if applicable, CDBG, and Rental Assistance Programs.

9. Maintains current and thorough working knowledge of guidelines and principles of affordable housing.

10. Reviews bids, cost estimates, title reports, and escrow instructions; makes recommendations to the Director on grants and rebates.

11.Acts as staff liaison to Boards and Committees as assigned.

12. Acts as staff assistant to Housing Rent Board, if applicable, and provides research analysis and staff reports on a variety of topics including contractor agreements.

13.Attends Planning Commission, City Council, and other related meetings as needed per the Director's discretion.

Knowledge of:
• Rent Control Ordinances.
• Affordable Housing Programs and Grants.
• HUD regulations regarding Section 8 Rental Assistance Payments Program and Neighborhood Preservation Program.
• HUD's Housing Quality Standards.
• Landlord/tenant laws and mediation ordinances.
• Principles and practices of supervision.

Skill and Ability to:
• Communicate with people of all ages, economic, and cultural backgrounds as well as fellow employees.
• Analyze complex written and contractual documents.
• Communicate concisely and clearly in both verbal and written form recommending appropriate financing approaches and processing loan documents.
• Understand, interpret, and effectively apply regulations regarding Rental Assistance.
• Negotiate contracts.
• Assign work, lead, train and supervise employees.
• Evaluate work performance based upon inspection or review of completed work product.

These are position functions which may be changed, deleted or reassigned to accommodate an individual with a disability.

Exhibit 5 50

Training and Experience
Any combination equivalent to training and experience that could likely provide the required knowledge, skills, and abilities would be qualifying. A typical way to obtain the knowledge, skills, and abilities would be a Bachelor's Degree from an accredited college or university in Business or Public administration, or a related field.

Four (4) years of professional work experience in affordable housing, housing rehabilitation, rent control, or local community development programs; or, ten (10) years professional work experience in aforementioned areas in lieu of education. A minimum of two (2) years of experience coordinating or providing technical or general supervision to others is required. A Master's Degree is desirable.

Ability to speak Spanish is highly desirable.

License(s) / Certification(s)
Valid California Class C driver's license and acceptable driving record.

Physical Requirements
Work is performed in an office environment with several hours spent sitting and using a computer terminal or standing at the front service counter assisting service users. May require travel to attend meetings and conferences.

Exhibit 5 51

Date Adopted: February 12, 2024

CITY OF BELL GARDENS

DEPUTY CITY MANAGER /

DIRECTOR OF COMMUNITY DEVELOPMENT
Under the supervision of the City Manager, the Deputy City Manager / Director of Community Development is responsible for the planning, administering, and directing of the following divisions: Planning, Building and Safety, Code Enforcement, Business Licensing, Economic Development, Housing, and Community Development Block Grant (CDBG) activities of the City.

The Deputy City Manager / Director of Community Development is a specialized Executive Management class assigned a variety of responsible duties relating to the directing and implementation of Planning, Building and Safety, Code Enforcement, Business Licensing, Economic Development, Housing, and Community Development Block Grant (CDBG), and other programs as directed by the City Manager.

Essential functions, as defined under the Americans with Disabilities Act, may include any of the following representative duties, knowledge, and skills. This is not a comprehensive listing of all functions and duties performed by incumbents of this class, - employees may be assigned duties which are not listed below; reasonable accommodations will be made as required. The job description does not constitute an employment agreement and is subject to change at any time by the employer. Essential duties and responsibilities may include, but are not limited to, the following.- 1 .

Serves as Acting City Manager at the request of the City Manager when out of office.

2. Provides direction, planning, and leadership for all Community Development divisions and related activities; evaluates operational performance, reviews programs and projects, coordinates activities, and fosters communications within the department; identifies problems, collaborates with other staff, and provides conflict resolution.

3. Supervises, guides, motivates, manages, and evaluates assigned staff; delegates work, fosters working relationships, and provides training and instruction on methods, procedures, and program goals; reviews, evaluates, and provides feedback on employee performance.

4. Prepares and administers the Department budget; provides annual and monthly feedback on revenue and expenses; proposes changes or updates to the budget and consistently reviews potential areas needing fund re -allocation.

5. Collaborates and engages with other department heads, leaders, supervisors, community members, and the general public on community development needs; provides recommendations for planning, programs, projects, business licensing, Exhibit 6
code enforcement and economic de Qlopment; coordinates work to ensure Z
timeliness, efficiency, and accuracy.

6. Develops and maintains extensive relationships; works on special projects requested by the City Manager, the City Council, or other departments; conducts strategic and long-range planning, research, and analysis for the Department and the City.

7. Attends, engages, and represents the City at various meetings; develops, prepares, and presents documents and reports to the Board and City Council; studies and presents potential changes which could impact Community Development; writes staff reports as necessary.

8. Supports the relationship between Bell Gardens and the general public by demonstrating courteous and cooperative behavior when interacting with citizens, visitors, and City staff; maintains confidentiality of work -related issues and pertinent information; performs other duties as required or assigned.

Knowledge of:
• Community Development administration, planning, and management. • Applicable State and Federal statutes and codes.
• Project management principles and practices.
• Negotiation techniques, real estate principles, legislative analysis, cost benefit analysis, and public administration.
• Budget development and implementation.
• California Uniform Building Code, Government Code, Health and Safety Code • City General Plan, City Housing Element, and the Federal Register. • Personnel management and supervision.
• Record keeping, report preparation, filing methods, and public speaking. • General office policies and procedures; computers and general office equipment.

Skill in:
• Organizing work and setting priorities to meet deadlines. • Using tact, discretion, initiative, and independent judgement within established guidelines.
• Affordable housing development, land entitlement process, and planning principles.
• Researching, compiling, and summarizing a variety of informational and statistical data.
• Understanding building codes, municipal finance, and municipal law. • Understanding and interpreting complex policies, protocols, and procedures. • Planning, organizing, assigning, directing, and evaluating the work of assigned staff.
• Operating a computer with intermediate level proficiency in document and file management, word-processing, database management, and internet and email usage.

These are position functions which may be changed, deleted or reassigned to accommodate an individual with a disability.

Exhibit 6 53

MINIMUM QUALIFICATIONS
Any combination of education, training and experience that has provided the knowledge, skills and abilities necessary for successful job performance. A typical way to obtain the requisite qualifications to perform the duties of this class is as follows:

Education/Training
Graduation from an accredited college or university with a Bachelor's Degree in Urban Planning, Public Administration, Business Administration, or related field; Master's Degree in Urban Planning, Public Administration, or Business Administration is highly desirable.

Ability to speak Spanish is highly desirable.

Experience
Ten (10) years of experience in housing, planning, administration, real estate finance, or public policy; OR an equivalent combination of education, training, and experience.

Licenses or Certifications
Valid California Class C driver's license and acceptable driving record.

Physical Requirements
Work is performed in an office environment with several hours spent sitting and using a computer terminal. May require travel to attend meetings and conferences.

Exhibit 6 54

CITY OF BELL GARDENS

OFFICE OF THE CITY MANAGER

AGENDA REPORT
Item 6.

TO: Honorable Mayor and City Council Members
FROM: Michael B. O'Kelly, City Manager
BY: Bernardo I niguez, Director of Public Works/Facilities Gustavo Romo, Director of Community Development
SUBJECT: APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO SOLICIT

BIDS FOR THE SOIL REM EDIATION PROJECT AT THE FORMER BERK OIL SITE (CIP NO.3927)
DATE: February 12, 2024
RECOMMENDATION:

It is staff's recommendation that the City Council:

1. Approve plans and specifications for the Soil Remediation Project at the former Berk Oil Site; and

2. Authorize staff to solicit competitive bids and publish the Notice Inviting Sealed Bids.

BACKGROUND/DISCUSSION:

Since 1985 the former Berk Oil site on Shull Street (Project Site) has been the subject of numerous investigations and reports of contamination. Berk Oil conducted asphalt mixing and oil distribution operations in the western portion of the Project Site from approximately 1965 through 1989, and Pacific Metal Craft conducted metal and plastic parts fabrication in the eastern portion of the Project Site from 1984 through the early 1990s, when the facility was demolished. Six known underground storage tanks (USTs) and a sub -grade steam cleaning sump were used during their years of operation. Preliminary investigations revealed volatile organic and petroleum hydrocarbon contamination across several of the parcels. There was concern that contamination sources were polluting the underlying groundwater, further compromising environmental conditions.

The former Bell Gardens Redevelopment Agency purchased the western portion of the Project Site in 1985 and the eastern portion in 1992, with the City of Bell Gardens (City) Successor Agency taking over ownership of the Project Site in 2012. Since the acquisition, the area has lain fallow and unused and has recently had conceptual approvals for residences and erection of an electronic billboard.

The Project Site is included in the Department of Toxic Substances Control's (DTSC's) EnviroStor system, which tracks the cleanup, permitting, enforcement and investigation efforts for sites with known or potential contamination. I n August 2011, DTSC approved a Targeted Site Investigation (TS I) for the Project Site, which consisted of a contiguous series of vacant parcels, bounded by residences to the north, and to the west by the 1-710 freeway. The Los Angeles Regional Water Quality Control Board (Regional Board) is the Lead Agency working with DTSC and the City for the Project Site's cleanup activities. The Project Site is an Open Site Assessment with the Regional Board as of October 19, 2015.

On January 1, 2021, Senate Bill 158 authorized DTSC to implement a grant program known as the Equitable Community Revitalization Grant (ECRG) to provide financial assistance to communities via reimbursable grants to investigate and cleanup brownfield sites. Brownfields are sites that are contaminated or thought to be contaminated 55 with hazardous waste, and are underutilized due to perceived remediation cost and liability concerns. Cleaning up brownfields eliminates the threat from hazardous substances and it also enables abandoned or underutilized land to be used for productive reuse, such as residential or commercial development. The ECRG is an unprecedented opportunity to address the historically disproportionate impacts to communities and to revitalize land for public benefit.

On June 6, 2022, DTSC awarded the City a ECRG for an amount of $6,495,000 to fund cleanup activities at the Project Site.

On October 14, 2022, the City Council approved a Professional Services Agreement with WSP USA Environment & Infrastructure Inc. (WSP) for remediation consulting services for the Project Site. WSP prepared a Remedial Action Work Plan (RAW) for the Project Site to include refinement, planning, and design of the remedial actions, and conduct actions to comply with the California Environmental Quality Act (CEQA) and grant reporting requirements.

WSP has also prepared the construction documents for the Soil Remediation Project at the former Berk Oil Site (Project), which include plans, specifications, and engineer's estimate, in accordance with the City's internal procurement policies and the Public Contract Code. The Project scope of work includes, but is not limited to, site preparation activities (removal of shallow debris, loose and disturbed soil, building foundations, and asphalt/pavement surfaces), export and offsite recycling/disposal of materials generated during site preparation, excavation of approximately 8,100 bank cubic yards of impacted soil, export and offsite disposal of impacted soil, import of backfill material (as needed), excavation backfilling and compaction and/or recontouring of removal areas to eliminate trip/fall/entrapment hazards, and site restoration. The total contract period for the Project is seventy (70) working days, which includes twenty (20) working days for the preparation of the Work Plans described in the RAW.

Upon authorization by the City Council, staff will proceed with the bid phase of the Project, publishing the Notice Inviting Sealed Bids (NISB) in a local newspaper of general circulation and other electronic media, and posting the plans and specifications on the City's website. Bids will be publicly opened and a contract will be awarded to the lowest responsive and responsible bidder at a future City Council meeting. The published NISB will state the time and place for receiving and opening of sealed bids, and will distinctly describe the Project. The NISB will be published in accordance with Public Contract Code § 20164.

Tentative Bid Schedule is as follows:
• Bid Period: February 13, 2024, through March 14, 2024 • Mandatory Pre -Bid Meeting: February 27, 2024, at 10:00 a.m. • Requests for Information Due: March 5, 2024, at 12:00 p.m. • Bid Opening: March 14, 2024, at 11:00 a.m.
• Anticipated Award of Contract: April 8, 2024
DESIGN IMMUNITY:

Government Code section 830.6 states in part, "Neither a public entity nor a public employee is liable for an injury caused by the plan or design of a construction of, or an improvement to, public property where such plan or design has been approved in advance of the construction or improvement by the legislative body of the public entity or by some other body or employee exercising discretionary authority to give such approval or where such plan or design is prepared in conformity with standards previously approved." In order to bid the Project and provide California design immunity, per Government Code section 830.6, the City 56 Council must approve the plans and specifications prior to the construction bidding process. The intent of Government Code section 830.E is to prevent a judge or juryfrom second-guessing discretionary approvals made by the public agency and its employees regarding a plan or design for a construction project.

The plans and specifications for the Project are consistent with the City's standards and the General Plan. Staff's recommendation for City Council approval of the plans and specifications is intended to avail the City of the immunities set forth in Government Code section 830.6, prior to proceeding with construction of the Project. Through the City Council's approval, the Director of Public Works/Facilities, as the City's project manager, would be authorized to act on the City's behalf in approving any necessary alterations or modifications of the plans and specifications throughout the course of the Project.

ENVI RONMENTAL ANALYSIS :

The Regional Board has completed an Initial Study for the Project in accordance with CEQA (Pub. Resources Code, div. 13, § 21000 et seq) and accompanying Guidelines [California Code of Regulations [CCR], tit. 14, § 15000 et seq]. The Regional Board, acting as the Lead Agency, has the primary responsibility for carrying out or approving the Project, whereas the DTSC, acting as the Responsible Agency, has discretionary authority over a project through management of the ECRG that the City received from DTSC. Based on the Initial Study, the Regional Board is recommending a finding that the Project could not have a significant effect on the environment; therefore, a Negative Declaration will be prepared.

CONCLUSION:

Upon authorization by the City Council, staff will proceed with the bid phase of the Project.

FISCAL IMPACT:

The Project's construction cost is estimated to be $3,205,700. The Project will be funded through the ECRG received from DTSC.

ATTACHMENTS:

Exhibit 1 - Notice Inviting Sealed Bids
APPROVED ELECTRONICALLY BY:

Michael B. O'Kelly, City Manager
Stephanie Vasquez, City Attorney and/or Susie Altamirano, Assistant City Attorney Manuel Carrillo, Director of Finance and Administrative Services 57 NOTICE INVITING SEALED BID
FOR

SOIL REMEDIATION PROJECT

AT FORMER BERK OIL SITE
CIP NO. 3927

IN THE CITY OF BELL GARDENS
PUBLIC NOTICE IS HEREBY GIVEN that the City of Bell Gardens as AGENCY, invites sealed bids for the above -stated project and will receive such bids in the offices of the City Clerk, City Hall, 7100 South Garfield Avenue, Bell Gardens, California 90201, up to the hour of 11:00 AM on March 14, 2024, at which time they will be publicly opened.

Copies of the Plans, Specifications, and contract documents are available on the City's website at https://www.belIgardens.org/i-want-to/view-bids-rfps/rfps-and-bids . To be on the Plan Holders List for this project, each bidder must submit a Bidder's Information Sheet, which is also available on the City's website, to biniguez(a)bellgardens.org and and i. hope. cox(a)-wsp. com. Bids will not be accepted unless the bidder is on the Plan Holder List. All Bidder Information Sheets are required to be submitted no later than March 5, 2024. Bids will not be accepted unless the Bidder Information Sheet is submitted and logged onto the plan holders list. Failure to submit the Bidder Information Sheet by the deadline noted will result in declaring any submitted bids as non -responsive.

To comply with SB 854, beginning January 1, 2015 the following applies:

1. No contractor or subcontractor may be listed on a bid proposal for public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

2. No contractor or subcontractor may be awarded a contract for public works on a public works project awarded on or after April 1, 2015, unless registered with the DIR.

3. The project is subject to compliance monitoring and enforcement by the DIR.

4. Require the prime contractor to post job site notices prescribed by regulation (regulation not created yet) or the City must post the notices itself.

The Contractor shall fill in the Department of Industrial Relations (DIR) Contractor Registration Number Form provided in Appendix "B" and submit it with the sealed Bid.

Exhibit 1 58

Attendance at a pre -bid meeting is mandatory and will be held on Tuesday, February 27, 2024 at 10:00 AM at the City Hall Council Chambers (7100 Garfield Avenue, Bell Gardens, California 90201.) All Prime Contractors are required to have a representative attend and sign in at the pre -bid meeting. Failure to comply with this attendance and sign -in requirement will result in Bidder's proposal being found non -responsive to the required procedures.

Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Pursuant to the provisions of Section 1773.2 of the Labor Code of the State of California, the minimum prevailing rate of per hourly wages for each craft, classification or type of workman needed to execute the contract shall be those determined by the Director of Industrial Relations of the State of California, which are on file at the City Hall, City of Bell Gardens, 7100 South Garfield Avenue, Bell Gardens, California 90201, and are available to any interested party on request.

Attention is directed to the provisions of Section 1777.5 (Chapter 1141, Statutes of 1968) and 1777.5 of the Labor Code concerning the employment of apprentices by the Contractor or any such subcontractor under him. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, age, marital status, ancestry, sex, religion, or handicap will also be required.

The AGENCY will deduct 5 percent retention from all progress payments as specified in Section 9-3.2 of these specifications. The Contractor may substitute an escrow holder surety of equal value to the retention. The Contractor shall be beneficial owner of the surety and shall receive any interest thereon. Contractor shall provide AGENCY with weekly payroll reports.

The AGENCY hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, age, marital status, ancestry, sex, religion, sexual orientation or handicap in any consideration leading to the award of contract.

In entering into a public works contract, or a subcontract, to supply goods, services, or material pursuant to a public works contract, the Contractor, or subcontractor, offers and agrees to assign to the awarding body all rights, title and interest in, and to, all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties.

Exhibit 1 59

Bids must be prepared on the approved Proposal forms or copies thereof in conformance with the Instructions to Bidders and submitted in a sealed envelope plainly marked on the outside as follows:

SOIL REMEDIATION PROJECT

AT FORMER BERK OIL SITE
CIP NO. 3927
The bid must be accompanied by cash, a certified or cashier's check, or bidder's bond, issued by an "admitted surety insurer" made payable to the AGENCY for an amount no less than 10 percent of the total base bid amount.

All bidders shall be licensed in accordance with the provisions of the Business and Professions Code and shall possess a State Contractor's License, Class A, at the time of bid submittal. The successful Contractor and each of their subcontractors will be required to possess a Business License from the City.

The liquidated damages for this project is five hundred dollars ($500.00) per calendar day the project is not completed within the contract time.

The AGENCY reserves the right to reject any or all bids, to waive any irregularity and to take all bids under advertisement for a period of sixty (60) days.

The Contractor shall complete all work in every detail within seventy (70) working days comprised of twenty (20) working days for Contractor's preparation of Work Plans, and Engineer's review, five (5) working days for mobilization, forty (40) working days for construction, and five (5) working days for demobilization, after the effective date in the Notice to Proceed with the Work to be issued by the CITY.

BY ORDER OF the City of Bell Gardens, California.

Dated: February 12, 2024
Exhibit 1 60

CITY OF BELL GARDENS

OFFICE OF THE CITY MANAGER
f b.

AGENDAREPORT
Item 7.

TO: Honorable Mayor and City Council Members
FROM: Michael B. O'Kelly, City Manager
BY: Bernardo I niguez, Director of Public Works/Facilities Karla Gonzalez, Senior Management Analyst
SUBJECT: AWARD OF PROFESSIONAL SERVICES AGREEMENT FOR MUNICIPAL

ENGINEERING SERVICES
DATE: February 12, 2024
RECOMMENDATION:

It is staff's recommendation that the City Council:

1. Adopt the attached Resolution; and

2. Authorize the City Manager to execute a Professional Services Agreement with Bowman Infrastructure Engineers Ltd. (Bowman Infrastructure) for ongoing as -needed Municipal Engineering Services, subject to City Attorney approval as to form.

BACKGROUND/DISCUSSION:

The City of Bell Gardens (City) addresses its professional engineering services and requirements through contracted Municipal Engineering Services. The Bell Gardens Municipal Code (BGMC) authorizes the City to select professional services based on demonstrated competence and professional qualifications necessary for the satisfactory performance of the required services.

On October 10, 2023, the Public Works Department released a Request for Proposals (RFP) for Municipal Engineering Services. On October 16, 2023, the City issued Addendum No.1 to extend the proposal submittal deadline from October 26, 2023, to November 2, 2023; and on October 30, 2023, the City issued Addendum No. 2 to extend the proposal submittal deadline to November 9, 2023, and to respond to questions from the prospective bidders.

The Municipal Engineering Services to be provided under the RFP include, but are not limited to, the following:

City Engineering Services
• Providing technical advice, feasibility studies and constructability reviews, analyzing and preparing long- and short- term engineering programs consistent with the City's economic capabilities, identifying future Capital Improvement Program ("Cl P") projects and preparing a robust Cl P in alignment with the City's needs.

As -needed Traffic. Water, and Development Engineering Services • Preparing assessments and analyses, providing technical advice, and assisting City's departments, commissions, and committees on various issues and studies related to traffic, private developments, and the City's water system and infrastructure.

Public Works Permit Management and Inspections
61 • Reviewing and processing right-of-way permit applications, handling engineering -related inquiries from stakeholders, performing daily inspections, issuing correction and stop work notices when applicable.

C I P Project Design, Construction Management, and Inspections • Providing design, technical studies, land surveys, project management and administration, funding management, construction management and inspections, and labor compliance services in association with the City's adopted CI P projects.

NPDES Stormwater Compliance Consultant Services
• Providing any required stormwater certifications, trainings, program implementation, inspections, and monitoring necessary to achieve and maintain compliance with the requirements and/or conditions contained in the Municipal Separate Storm Sewer System National Pollutant Discharge Elimination System (MS4 NPDES) Permit, the State General Construction and General Industrial Activity Permits (CGP and IGP), the Los Angeles River Upper Reach 2 Watershed Management Program and Coordinated Integrated Monitoring Programs (LARUR2 WMP and CIMP); and the requirements and conditions contained in the Safe, Clean Water Program (Measure W), of which the City is a recipient of Municipal and Regional Measure W funds.

On November 9, 2023, a total of seven (7) proposals were received in response to the RFP. The proposals were reviewed and ranked by a panel consisting of Public Works staff, based on the following criteria:
• Demonstrated understanding of the scope of work for supporting City projects/programs and ability to complete the requirements.
• Personnel qualifications and ability to provide other Public Works -related services such as project administration, grant administration, and contract administration. This includes familiarity with federal, State and regional/local agency requirements, including funding and project entitlement requirements from agencies such as FHWA, FTA, Caltrans, Metro, and other entities.
• Proven recent experience of relevant services and projects, and references.

On January 16 and 24, 2024, interviews were conducted with the top five (5) proposers.

The table below illustrates the scores for the seven proposers:

Comprehension of
RFP
Qualification of
Proposers
References
Total
(100
Points)
Bowman Infrastructure
15 63
19 96
Willdan Engineering
15 62
19 95
Onward Engineering
14 57
18 89
Transtech
13 55
18 85
Ladayu Consulting
Group
13 52
17 82
Project Partners
11 43
16 69
Minagar & Associates,
1 nc.
7 45
16 67
Although contracts for professional services need not be awarded to the lowest responsible bidder, cost may be considered as a factor. The table below illustrates a comparison of the hourly rates offered by the top two rated firms:
62 Bowman Infrastructure
Classification
Hourly Rate
City Engineer
$160
City Traffic Engineer
$152
Senior Water Engineer
$158
Development Engineer
$152
Permit Inspector
$102
NPDES Program Manager
$151
Willdan Engineering
Classification
Hourly Rate
City Engineer
$155
City Traffic Engineer
$150
Water Engineer
$168
Development Engineer
$158
Permit Inspector
$125
NPDES Program Manager
Varies
CONCLUSION:

Based on Bowman Infrastructure's proposal rating, its competitive hourly rates, and previous satisfactory performance with the City in providing the requested services, staff is recommending that the City Council award Bowman Infrastructure a three-year Professional Services Agreement with an optional two one-year extensions for an annual amount not -to -exceed $1,500,000.

FISCAL IMPACT:

Funds for contracted engineering services are included in the FY 2023-2024 operating and capital improvement project budgets.

ATTACHMENTS:

Exhibit 1 - Resolution No. 2024-07
Exhibit 2 -Agreement with Exhibits
APPROVED ELECTRONICALLY BY:

Michael B. O'Kelly, City Manager
Stephanie Vasquez, City Attorney and/or Susie Altamirano, Assistant City Attorney Manuel Carrillo, Director of Finance and Administrative Services 63 RESOLUTION NO. 2024-07

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BELL

GARDENS, CALIFORNIA, APPROVING A PROFESSIONAL SERVICES

AGREEMENT BY AND BETWEEN THE CITY OF BELL GARDENS AND
BOWMAN INFRASTRUCTURE ENGINEERS LTD. FOR MUNICIPAL

ENGINEERING SERVICES
WHEREAS, the City of Bell Gardens ("City") addresses its professional engineering services and requirements through contracted Municipal Engineering Services; and
WHEREAS, in accordance with Bell Gardens Municipal Code ("BGMC") Section

3.04.105, on October 10, 2023, the City released a Request for Proposals for Municipal Engineering Services ("RFP"); and
WHEREAS, on November 9, 2023, the City received responses from seven qualified firms; and
WHEREAS, after reviewing and scoring the proposals, City staff from the Public Works Department determined that Bowman Infrastructure Engineers Ltd. ("Bowman Infrastructure") is qualified to perform the services requested based on its demonstrated understanding of the scope, expertise, and competitive rates; and WHEREAS, the City desires to enter into an agreement with Bowman Infrastructure for Municipal Engineering Services for a three-year term with an optional two one-year extensions.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Bell Gardens as follows:

SECTION 1. The City Council of the City of Bell Gardens hereby finds that the above recitals are true and correct and incorporate them herein by this reference.

SECTION 2. The City Council hereby approves an on -going as -needed Professional Services Agreement for Municipal Engineering Services by and between the City and Bowman Infrastructure, in a form approved by the City Attorney, for an annual amount not -to -exceed $1,500,000, which shall be consistent with the rate schedule set forth in Bowman Infrastructure's proposal.

SECTION 3. The City Council hereby authorizes the City Manager to execute the agreement along with all documents reasonably necessary to effectuate the intent of this Resolution.

SECTION 4. The City Clerk shall attest and certify to the passage and adoption of this Resolution and enter it into the book of original resolutions, and it shall become effective immediately upon its approval.
[Signatures on the following page]
Exhibit 1 64

Resolution No. 2024-07
PASSED, APPROVED and ADOPTED this 12t" day of February, 2024.

THE CITY OF BELL GARDENS
Jorgel Chavez, Mayor
APPROVED AS TO FORM: ATTEST:

Stephanie Vasquez
City Attorney
2of3
Daisy Gomez
City Clerk
Exhibit 1 65

Resolution No. 2024-07
I, , City Clerk of the City of Bell Gardens, hereby CERTIFY that City Council Resolution No. was adopted by the Bell Gardens City Council at a regular meeting of the City Council held on
the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:
3of3
, and was approved and passed by
Daisy Gomez
City Clerk
Exhibit 1 66

2024

PROFESSIONAL SERVICES AGREEMENT
(Engagement: Ongoing As -Needed Municipal Engineering Services) (Parties: Bowman Infrastructure Engineers Ltd. and City of Bell Gardens) THIS PROFESSIONAL SERVICES AGREEMENT (hereinafter, "Agreement") is made and entered into this day of 2024 (hereinafter, the "Effective Date") by and between the CITY OF BELL GARDENS, a municipal corporation (hereinafter, "CITY") and BOWMAN INFRASTRUCTURE ENGINEERS LTD. (hereinafter, "CONSULTANT"). For the purposes of this Agreement, CITY and CONSULTANT may be referred to collectively by the capitalized term "Parties." The capitalized term "Party" may refer to CITY or CONSULTANT interchangeably, as appropriate.

RECITALS
WHEREAS, CITY requires ongoing as -needed municipal engineering services; and
WHEREAS, CITY staff has determined that CONSULTANT possesses the experience, skills and training necessary to competently provide such services to CITY; and
WHEREAS, the execution of this Agreement was approved by the Bell Gardens City Council at its Regular Meeting.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions herein contained, CITY and CONSULTANT agree as follows:

1. ENGAGEMENT TERMS

1.1 TERM: This Agreement shall have a term of three (3) years commencing on March 1, 2024 through March 1, 2027 (hereinafter, the "Term"). Nothing in this Section shall operate to prohibit or otherwise restrict the CITY's ability to terminate this Agreement at any time for convenience or for cause as provided under Article V (Termination), below. The Term of the Agreement may be extended by the CITY subject to its same terms and conditions for a maximum of two (2) one-year extensions, provided the City Manager issues written notice of its intent to extend the Term of the Agreement prior to the expiration of the initial Term.

1.2 SCOPE OF WORK:

A. Subject to the terms and conditions of this Agreement, CONSULTANT agrees to provide the services and tasks described in that certain Request for Proposals of CITY entitled "Request for Proposal for Municipal Engineering Services" (hereinafter, "CITY RFP") dated October 10, 2023, and the written proposal of CONSULTANT entitled "City of Bell Gardens Municipal Engineering Services" (hereinafter, the "CONSULTANT 1 Exhibit 2 67

PROPOSAL") dated November 9, 2023. The CITY RFP and the CONSULTANT PROPOSAL are attached and incorporated hereto as Exhibit "A" and "B" respectively. The term "Scope of Work" shall be a collective reference to the CITY RFP and the CONSULTANT PROPOSAL.

The capitalized term "Work" shall be a collective reference to all the various services and tasks referenced in the Scope of Work. In the event of any conflict or inconsistency between the provisions of the document entitled CITY RFP and the provisions of the document entitled CONSULTANT PROPOSAL, the requirements of the document entitled CITY RFP shall govern and control but only to the extent of the conflict or inconsistency and no further. In the event of any conflict or inconsistency between the provisions of the Scope of Work and the provisions of this Agreement to which the Scope of Work is attached, the provisions of this Agreement shall govern and control.

1.3 PROSECUTION OF WORK:

A. CONSULTANT shall perform the Work contemplated under this Agreement on an as -needed basis. Nothing in this Agreement shall be construed to grant CONSULTANT the exclusive right to perform any of the types of services or tasks contemplated under this Agreement nor shall anything in this Agreement be construed to entitle CONSULTANT to the receipt of any sums under this Agreement, except to the extent CITY requests the performance of any Work in the manner described below and such Work is in fact performed and completed by CONSULTANT and accepted by CITY.

CITY requests for the performance of specific as -needed services or tasks contemplated under this Agreement shall be made in the form of a written work order(s) issued by the City Representative (each such written request hereinafter referred to as a "Task Order"). The standard Task Order form will be provided by the City Representative and shall include the following information-
1 . A detailed description of the specific services or tasks requested;

2. The location of where the particular services or tasks are to be performed, if applicable;

3. A not -to -exceed budget for performing the services or tasks;

4. A timeline for completing the requested services or tasks;

5. Any other information CITY deems necessary and relevant to the requested services or tasks; and

6. The signature of the City Representative, confirming that the services or tasks have been authorized by the City Representative.

B. CONSULTANT shall perform no as -needed work under this Agreement without a signed Task Order provided by the City Representative, containing the information set forth in Section 1.3 (A), above.

C. Time is of the essence in the performance of Work under this Agreement, and in the absence of a specific schedule or other instructions from the City 2 Exhibit 2 68

Representative, CONSULTANT shall begin and complete performance of the Work in a timely and a diligently manner as possible.

1.4 COMPENSATION: CONSULTANT shall perform the Work in accordance with the "Cost and Pricing Proposal Price Sheet" beginning on page 100 of the CONSULTANT PROPOSAL (hereinafter, the "FEE SCHEDULE"). The foregoing notwithstanding, CONSULTANT's total compensation for the performance of all Work contemplated under this Agreement, will not exceed the total budgeted annual aggregate sum of ONE MILLION FIVE HUNDRED THOUSAND DOLLARS ($1,500,000) (hereinafter, the "Annual Not -to -Exceed Sum") during the Term of this Agreement, unless such added expenditures are first approved by the City Council. In the event CONSULTANT's charges are projected to exceed the Annual Not -to -Exceed Sum prior to the expiration of this Agreement, CITY may suspend CONSULTANT's performance pending CITY's approval of any anticipated expenditures in excess of the Annual Not -to -Exceed Sum or any other CITY approved amendment to the compensation terms of this Agreement.

1.5 PAYMENT OF COMPENSATION: Following the conclusion of each calendar month, CONSULTANT shall submit to CITY an itemized invoice indicating the services performed and tasks completed during the recently concluded calendar month, including any applicable Task Order services and the reimbursable out-of- pocket expenses incurred. If the amount of CONSULTANT's compensation is a function of hours worked by CONSULTANT's personnel, the invoice should indicate the number of hours worked, the persons responsible for performing the Work, the rate of compensation at which such services and tasks were performed, the subtotal for each task and service performed and a grand total for all services performed. Within thirty (30) calendar days of receipt of each invoice, CITY will notify CONSULTANT in writing of any disputed amounts included in the invoice.

Within forty-five (45) calendar days of receipt of each invoice, CITY will pay all undisputed amounts included on the invoice. CITY will not withhold applicable taxes or other authorized deductions from payments made to CONSULTANT.

1.6 ACCOUNTING RECORDS: CONSULTANT will maintain complete and accurate records with respect to all matters covered under this Agreement for a period of three (3) years after the expiration or termination of this Agreement. CITY will have the right to access and examine such records, without charge, during normal business hours. CITY will further have the right to audit such records, to make transcripts therefrom and to inspect all program data, documents, proceedings, and activities.

1.7 ABANDONMENT BY CONSULTANT: In the event CONSULTANT ceases to perform the Work agreed to under this Agreement or otherwise abandons the undertaking contemplated herein prior to the expiration of this Agreement or prior to completion of any or all tasks set forth in the Scope of Work, CONSULTANT will deliver to CITY immediately and without delay, all materials, records and other work product prepared or obtained by CONSULTANT in the performance of this Agreement. Furthermore, CONSULTANT will only be compensated for the reasonable value of the services, tasks and other Work performed up to the time of cessation or abandonment, less a deduction for any damages, costs or 3 Exhibit 2 69

additional expenses which CITY may incur as a result of CONSULTANT's cessation or abandonment.

II.

PERFORMANCE OF AGREEMENT

2.1 CITY'S REPRESENTATIVE: The CITY hereby designates Bernardo Iniguez, Director of Public Works/Facilities (hereinafter, the "City Representative") to act as its representative for the performance of this Agreement. The City Representative or their designee will act on behalf of the CITY for all purposes under this Agreement. CONSULTANT will not accept directions or orders from any person other than the City Representative or their designee.

2.2 CONSULTANT REPRESENTATIVE: CONSULTANT hereby designates Sid Mousavi, MSCE, PE, Senior Principal, to act as its representative for the performance of this Agreement (hereinafter, "Consultant Representative").

Consultant Representative will have full authority to represent and act on behalf of the CONSULTANT for all purposes under this Agreement. Consultant Representative or their designee will supervise and direct the performance of the Work, using their best skill and attention, and will be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Work under this Agreement. Notice to the Consultant Representative will constitute notice to CONSULTANT.

2.3 COORDINATION OF SERVICE; CONFORMANCE WITH REQUIREMENTS:

CONSULTANT agrees to work closely with CITY staff in the performance of the Work and this Agreement and will be available to CITY staff and the City Representative at all reasonable times. All work prepared by CONSULTANT will be subject to inspection and approval by City Representative or their designees.

2.4 STANDARD OF CARE; PERFORMANCE OF EMPLOYEES: CONSULTANT represents, acknowledges and agrees to the following:

A. CONSULTANT will perform all Work skillfully, competently and to the highest standards of CONSULTANT's profession;
B. CONSULTANT shall at all times employ such force, plant, materials, and tools as will be sufficient in the opinion of the CITY to perform the Work within the time limits established, and as provided herein. It is understood and agreed that said tools, equipment, apparatus, facilities, labor, and material shall be furnished and said Work performed and completed as required by the Agreement, and subject to the approval of the CITY's authorized representative;
C. CONSULTANT will perform all Work in a manner reasonably satisfactory to the CITY;
D. CONSULTANT will comply with all applicable federal, state and local laws and regulations, including the conflict of interest provisions of Government 4 Exhibit 2 70

Code Section 1090 and the Political Reform Act (Government Code Section 81000 et seq.). CONSULTANT shall be liable for all violations of such laws and regulations in connection with the Work. If CONSULTANT performs any work knowing it to be contrary to such laws, rules and regulations, CONSULTANT shall be solely responsible for all costs arising therefrom; E. CONSULTANT understands the nature and scope of the Work to be performed under this Agreement as well as any and all schedules of performance;
F. All of CONSULTANT's employees and agents possess sufficient skill, knowledge, training and experience to perform those services and tasks assigned to them by CONSULTANT; and
G. All of CONSULTANT's employees and agents (including, but not limited to, subcontractors and subconsultants) possess all licenses, permits, certificates, qualifications and approvals of whatever nature that are legally required to perform the tasks and services contemplated under this Agreement and all such licenses, permits, certificates, qualifications and approvals will be maintained throughout the term of this Agreement and made available to CITY for copying and inspection.

The Parties acknowledge and agree that CONSULTANT will perform, at CONSULTANT's own cost and expense and without any reimbursement from CITY, any services necessary to correct any errors or omissions caused by CONSULTANT's failure to comply with the standard of care set forth under this Section or by any like failure on the part of CONSULTANT's employees, agents, contractors, subcontractors and subconsultants. Such effort by CONSULTANT to correct any errors or omissions will be commenced immediately upon their discovery by either Party and will be completed within seven (7) calendar days from the date of discovery or such other extended period of time authorized by the City Representative in writing and in their sole and absolute discretion. The Parties acknowledge and agree that CITY's acceptance of any work performed by CONSULTANT or on CONSULTANT's behalf will not constitute a release of any deficiency or delay in performance. The Parties further acknowledge, understand and agree that CITY has relied upon the foregoing representations of CONSULTANT, including but not limited to the representation that CONSULTANT possesses the skills, training, knowledge and experience necessary to perform the Work skillfully, competently and to the highest standards of CONSULTANT's profession.

2.5 ASSIGNMENT: The skills, training, knowledge and experience of CONSULTANT are material to CITY's willingness to enter into this Agreement. Accordingly, CITY has an interest in the qualifications and capabilities of the person(s) who will perform the services and tasks to be undertaken by CONSULTANT or on behalf of CONSULTANT in the performance of this Agreement. In recognition of this interest, CONSULTANT agrees that it will not assign or transfer, either directly or indirectly or by operation of law, this Agreement or the performance of any of CONSULTANT's duties or obligations under this Agreement without the prior 5 Exhibit 2 71

written consent of the CITY. In the absence of CITY's prior written consent, any attempted assignment or transfer will be ineffective, null and void and will constitute a material breach of this Agreement.

2.6 SUBSTITUTION OF KEY PERSONNEL: CONSULTANT has represented to CITY that certain key personnel will perform and coordinate the Work under this Agreement. Should one or more of such personnel become unavailable, CONSULTANT may substitute other personnel of at least equal competence upon written approval of CITY. In the event that CITY and CONSULTANT cannot agree as to the substitution of key personnel, CITY shall be entitled to terminate this Agreement for cause. As discussed below, any personnel who fail or refuse to perform the Work in a manner acceptable to the CITY, or who are determined by the CITY to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project or a threat to the safety of persons or property, shall be promptly removed from the Project by the CONSULTANT at the request of the CITY.

2.7 CONTROL AND PAYMENT OF SUBORDINATE: The Work will be performed by CONSULTANT or under CONSULTANT's strict supervision. CONSULTANT will determine the means, methods and details of performing the Work subject to the requirements of this Agreement. CITY retains CONSULTANT on an independent contractor basis and not as an employee. CONSULTANT reserves the right to perform similar or different services for other principals during the term of this Agreement, provided such work does not unduly interfere with CONSULTANT's competent and timely performance of the Work contemplated under this Agreement and provided the performance of such services does not result in the unauthorized disclosure of CITY's confidential or proprietary information. Any additional personnel performing the Work under this Agreement on behalf of CONSULTANT are not employees of CITY and will at all times be under CONSULTANT's exclusive direction and control. CONSULTANT will pay all wages, salaries and other amounts due to such personnel and will assume responsibility for all benefits, payroll taxes, Social Security and Medicare payments and the like. CONSULTANT will be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: Social Security taxes, income tax withholding, unemployment insurance, disability insurance, workers' compensation insurance and the like.

2.8 REMOVAL OF EMPLOYEES OR AGENTS: If any of CONSULTANT's officers, employees, agents, contractors, subcontractors or subconsultants are determined by the City Representative to be uncooperative, incompetent, a threat to the adequate or timely performance of the tasks assigned to CONSULTANT, a threat to persons or property, or if any of CONSULTANT's officers, employees, agents, contractors, subcontractors or subconsultants fail or refuse to perform the Work in a manner acceptable to the CITY, such officer, employee, agent, contractor, subcontractor or subconsultant will be promptly removed by CONSULTANT and will not be reassigned to perform any of the Work.

2.9 COMPLIANCE WITH LAWS: CONSULTANT will keep itself informed of and in compliance with all applicable federal, state or local laws to the extent such laws 6 Exhibit 2 72

control or otherwise govern the performance of the Work. CONSULTANT's compliance with applicable laws will include, without limitation, compliance with all applicable Cal/OSHA requirements and applicable regulations of the Federal Department of Housing and Urbanization.

2.10 NON-DISCRIMINATION: CONSULTANT represents that it is an equal opportunity employer and it shall not discriminate against any subconsultant, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

2.11 INDEPENDENT CONTRACTOR STATUS: The Parties acknowledge, understand and agree that CONSULTANT and all persons retained or employed by CONSULTANT are, and will at all times remain, wholly independent contractors and are not officials, officers, employees, departments or subdivisions of CITY.

CONSULTANT will be solely responsible for the negligent acts and/or omissions of its employees, agents, contractors, subcontractors and subconsultants.

CONSULTANT and all persons retained or employed by CONSULTANT will have no authority, express or implied, to bind CITY in any manner, nor to incur any obligation, debt or liability of any kind on behalf of, or against, CITY, whether by contract or otherwise, unless such authority is expressly conferred to CONSULTANT under this Agreement or is otherwise expressly conferred by CITY in writing.

III.

INSURANCE

3.1 DUTY TO PROCURE AND MAINTAIN INSURANCE: Prior to the beginning of and throughout the duration of the Work, CONSULTANT will procure and maintain policies of insurance that meet the requirements and specifications set forth under this Article. CONSULTANT will procure and maintain the following insurance coverage, at its own expense:

A. Commercial General Liability Insurance: CONSULTANT will procure and maintain Commercial General Liability Insurance ("CGL Coverage") as broad as Insurance Services Office Commercial General Liability coverage (occurrence Form CG 0001) or its equivalent. Such CGL Coverage will have minimum limits of no less than One Million Dollars ($1,000,000.00) per occurrence and Two Million Dollars ($2,000,000.00) in the general aggregate for bodily injury, personal injury, property damage, operations, products and completed operations, and contractual liability.

B. Automobile Liability Insurance: CONSULTANT will procure and maintain Automobile Liability Insurance as broad as Insurance Services Office Form Number CA 0001 covering Automobile Liability, Code 1 (any auto). Such Automobile Liability Insurance shall have minimum limits of no less than One Million Dollars ($1,000,000.00) per accident for bodily injury and property damage.

Exhibit 2 73

C. Workers' Compensation Insurance/ Employer's Liability Insurance: A policy of workers' compensation insurance in such amount as will fully comply with the laws of the State of California and which will indemnify, insure and provide legal defense for both CONSULTANT and CITY against any loss, claim or damage arising from any injuries or occupational diseases occurring to any worker employed by or any persons retained by CONSULTANT in the course of carrying out the Work contemplated in this Agreement.

D. Errors & Omissions Insurance: For the full term of this Agreement and for a period of three (3) years thereafter, CONSULTANT will procure and maintain Errors and Omissions Liability Insurance appropriate to CONSULTANT's profession. Such coverage will have minimum limits of no less than One Million Dollars ($1,000,000.00) per claim.

3.2 ADDITIONAL INSURED REQUIREMENTS: The CGL Coverage and the Automobile Liability Insurance will contain an endorsement naming the CITY and CITY's elected and appointed officials, officers, employees, agents and volunteers as additional insureds.

3.3 REQUIRED CARRIER RATING: All varieties of insurance required under this Agreement will be procured from insurers admitted in the State of California and authorized to issue policies directly to California insureds. Except as otherwise provided elsewhere under this Article, all required insurance will be procured from insurers who, according to the latest edition of the Best's Insurance Guide, have an A.M. Best's rating of no less than A:VII. CITY may also accept policies procured by insurance carriers with a Standard & Poor's rating of no less than BBB according to the latest published edition the Standard & Poor's rating guide. As to Workers' Compensation Insurance/ Employer's Liability Insurance, the CITY Representative is authorized to authorize lower ratings than those set forth in this Section.

3.4 PRIMACY OF CONSULTANT'S INSURANCE: All policies of insurance provided by CONSULTANT will be primary to any coverage available to CITY or CITY's elected or appointed officials, officers, employees, agents or volunteers. Any insurance or self-insurance maintained by CITY or CITY's elected or appointed officials, officers, employees, agents or volunteers will be in excess of CONSULTANT's insurance and will not contribute with it.

3.5 WAIVER OF SUBROGATION: All insurance coverage provided pursuant to this Agreement will not prohibit CONSULTANT or CONSULTANT's officers, employees, agents, subcontractors or subconsultants from waiving the right of subrogation prior to a loss. CONSULTANT hereby waives all rights of subrogation against CITY, its officials, officers, employees, agents and volunteers.

3.6 VERIFICATION OF COVERAGE: CONSULTANT acknowledges, understands and agrees, that CITY's ability to verify the procurement and maintenance of the insurance required under this Article is critical to safeguarding CITY's financial s
Exhibit 2 74

well-being and, indirectly, the collective well-being of the residents of the CITY.

Accordingly, CONSULTANT warrants, represents and agrees that it will furnish CITY with original certificates of insurance and endorsements evidencing the coverage required under this Article on forms satisfactory to CITY in its sole and absolute discretion. The certificates of insurance and endorsements for each insurance policy will be signed by a person authorized by that insurer to bind coverage on its behalf, and will be on forms provided by the CITY if requested. All certificates of insurance and endorsements will be received and approved by CITY as a condition precedent to CONSULTANT's commencement of any Work. Upon CITY's written request, CONSULTANT will also provide CITY with certified copies of all required insurance policies and endorsements.

3.7 FAILURE TO MAINTAIN COVERAGE: In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced immediately so as to avoid a lapse in the required coverage, CITY has the right but not the duty to obtain the insurance it deems necessary and any premium paid by CITY will be promptly reimbursed by CONSULTANT or CITY will withhold amounts sufficient to pay premium from CONSULTANT payments. In the alternative, CITY may cancel this Agreement effective upon notice.

3.8 SPECIAL RISKS OR CIRCUMSTANCES. CITY reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

IV.

INDEMNIFICATION

4.1 The Parties agree that CITY and CITY's elected and appointed officials, officers, employees, agents and volunteers (hereinafter, the "City Indemnitees") should, to the fullest extent permitted by law, be protected from any and all loss, injury, damage, claim, lawsuit, cost, expense, attorneys' fees, litigation costs, or any other cost arising out of or in any way related to the performance of this Agreement. Accordingly, the provisions of this indemnity provision are intended by the Parties to be interpreted and construed to provide the City Indemnitees with the fullest protection possible under the law. CONSULTANT acknowledges that CITY would not enter into this Agreement in the absence of CONSULTANT's commitment to indemnify, defend and protect CITY as set forth herein.

Notwithstanding the foregoing, to the extent CONSULTANT's Work are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to Claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT.

CONSULTANT's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the CITY, its officials, officers, employees, agents or volunteers.

4.2 To the fullest extent permitted by law, CONSULTANT shall indemnify, hold harmless and defend the City Indemnitees from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys' fees, 9 Exhibit 2 75

expert fees and all other costs, and fees of litigation) of every nature arising out of or in connection with CONSULTANT's performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole negligence or willful misconduct of the CITY.

4.3 CITY shall have the right to offset against the amount of any compensation due to CONSULTANT under this Agreement, any amount due to CITY from CONSULTANT as a result of CONSULTANT's failure to either pay CITY promptly for any costs associated with CONSULTANT's obligations to indemnify the City Indemnitees under this Article, or related to CONSULTANT's failure to either (i) pay taxes on amounts received pursuant to this Agreement, or (ii) comply with applicable workers' compensation laws.

4.4 The obligations of CONSULTANT under this Article will not be limited by the provisions of any workers' compensation act or similar act. CONSULTANT expressly waives its statutory immunity under such statutes or laws as to CITY and CITY's elected and appointed officials, officers, employees, agents, and volunteers.

4.5 CONSULTANT agrees to obtain executed indemnity agreements with provisions identical to those set forth herein this Article from each and every subcontractor or any other person or entity involved by, for, with or on behalf of CONSULTANT in the performance of this Agreement. In the event CONSULTANT fails to obtain such indemnity obligations from others as required herein, CONSULTANT agrees to be fully responsible and indemnify, hold harmless and defend CITY and CITY's elected and appointed officials, officers, employees, agents, and volunteers from and against any and all claims and losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of CONSULTANT's subcontractors or any other person or entity involved by, for, with or on behalf of CONSULTANT in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys' fees incurred by counsel of CITY's choice.

4.6 CITY does not, and shall not waive any rights that it may possess against CONSULTANT because of the acceptance by CITY, or the deposit with CITY, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost, or expense.

4.7 This Article and all provisions contained herein (including but not limited to the duty to indemnify, defend, and hold free and harmless) shall survive the termination or normal expiration of this Agreement and is in addition to any other rights or remedies which the CITY may have at law or in equity.

4.8 WORK OF CONSULTANT'S DESIGN PROFESSIONALS SERVICES: The duty to indemnify, defend and hold harmless as set forth under this subsection shall 10 Exhibit 2 76

apply to the negligence, recklessness or willful misconduct of any individual who qualifies as a "design professional" within the meaning of subsection (c)(2) of Section 2782.8 of the California Civil Code in so far as such negligence, recklessness or willful misconduct occurs in the performance, work or activities that must be performed by a "design professional." Subject to the limitation of the preceding sentence, to the fullest extent permitted by law, CONSULTANT shall immediately defend and indemnify and hold harmless the City Indemnities, defined above, from and against any and all liability, loss, damage, expense, cost (including without limitation reasonable attorneys' fees, expert fees and all other costs and fees of litigation) of every nature arising out of the negligence, recklessness, or willful misconduct of CONSULTANT or any of CONSULTANT's officers, employees, servants, agents, contractors, subcontractors or authorized volunteers or any other person or entity involved by, for, or with or on behalf of CONSULTANT in the performance of design professional services under this Agreement. The Parties understand and agree that the duty of CONSULTANT to indemnify, defend and hold harmless pursuant to this subsection includes the duty to defend as set forth in Section 2778 of the California Civil Code. CONSULTANT's obligation to indemnify applies unless it is finally adjudicated that the liability was caused by the sole active negligence or sole willful misconduct of an indemnified party. If it is finally adjudicated that liability is caused by the comparative active negligence or willful misconduct of an indemnified party, then CONSULTANT's indemnification obligation shall be reduced in proportion to the established comparative liability.

4.9 WORK OF ALL OTHER PERSONS/NON-DESIGN PROFESSIONALS: Except as otherwise provided under Section 4.2 of this Article, above, to the fullest extent permitted by law, CONSULTANT shall indemnify, defend and hold harmless the City Indemnitees from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys' fees, expert fees and all other costs and fees of litigation) of every nature to the extent caused by CONSULTANT's negligent performance under this Agreement, including but not limited to the negligent acts, errors or omissions of CONSULTANT or CONSULTANT's officers, employees, agents, servants, contractors, subcontractors or subconsultants or the failure of the same to comply with any of the duties, obligations or standards of care set forth herein. The duty to indemnify, defend and hold harmless under this subsection shall not encompass a duty to indemnity, defend or hold harmless for liability, loss, suit, damage, expense, or cost caused by the negligence or willful misconduct of any or all of the City Indemnitees. The duty to indemnify, defend and hold harmless as set forth under this subsection is intended to encompass liabilities, losses, damages, expense and costs not otherwise subject to subsection 4.2, above.

4.10 As to the duties to indemnify under Sections 4.1 and 4.2 of this Article, above, CITY shall have the right to offset against the amount of any compensation due CONSULTANT under this Agreement any amount due CITY from CONSULTANT as a result of CONSULTANT's failure to pay CITY promptly any indemnification arising under this Article and related to CONSULTANT's failure to either: (i) pay taxes on amounts received pursuant to this Agreement, or (ii) comply with applicable workers' compensation laws.
11 Exhibit 2 77

4.11 As to the duties to indemnify under Sections 4.1 and 4.2 of this Article, above, the obligations of CONSULTANT under this Article will not be limited by the provisions of any workers' compensation act or similar act. CONSULTANT expressly waives its statutory immunity under such statutes or laws as to CITY and CITY's elected and appointed officials, officers, employees, agents and authorized volunteers.

4.12 As to the duties to indemnify under Sections 4.1 and 4.2 of this Article, above, CONSULTANT agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Article from each and every subcontractor or any other person or entity involved by, for, with or on behalf of CONSULTANT in the performance of this Agreement. In the event CONSULTANT fails to obtain such indemnity obligations from others as required herein, CONSULTANT agrees to be fully responsible and indemnify, hold harmless and defend CITY and CITY's elected and appointed officials, officers, employees, agents and authorized volunteers from and against any and all claims and losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of CONSULTANT's subcontractors or any other person or entity involved by, for, with or on behalf of CONSULTANT in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys' fees incurred by counsel of CITY's choice.

4.13 As to the duties to indemnify under Sections 4.1 and 4.2 of this Article, above, CITY does not, and shall not, waive any rights that it may possess against CONSULTANT because of the acceptance by CITY, or the deposit with CITY, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense.

4.14 As to the duties to indemnify under Sections 4.1 and 4.2 of this Article, above, the duties to indemnify, defend and hold harmless as set forth under this Section, shall survive the early termination or normal expiration of this Agreement and shall be in addition to any other rights or remedies which the CITY may have at law or in equity.

V.

TERMINATION

5.1 TERMINATION WITHOUT CAUSE: CITY may immediately terminate this Agreement at any time for convenience and without cause by giving prior written notice of CITY's intent to terminate this Agreement which notice shall specify the effective date of such termination. Upon such termination for convenience, CONSULTANT will be compensated only for those services and tasks which have been performed by CONSULTANT up to the effective date of the termination.

CONSULTANT may not terminate this Agreement except for cause as provided under Section 5.2, below. If this Agreement is terminated as provided herein, CITY may require CONSULTANT to provide all finished or unfinished Documents and 12 Exhibit 2 78

Data, as defined in Section 6.1, below, and other information of any kind prepared by CONSULTANT in connection with the performance of the Work.

CONSULTANT will be required to provide such Documents and Data within fifteen (15) calendar days of CITY's written request. No actual or asserted breach of this Agreement on the part of CITY pursuant to Section 5.2, below, will operate to prohibit or otherwise restrict CITY's ability to terminate this Agreement for convenience as provided under this Section.

5.2 EVENTS OF DEFAULT; BREACH OF AGREEMENT:

A. In the event either Party fails to perform any duty, obligation, service or task set forth under this Agreement (or fails to timely perform or properly perform any such duty, obligation, service or task set forth under this Agreement), an event of default (hereinafter, "Event of Default") will occur. For all Events of Default, the Party alleging an Event of Default will give written notice to the defaulting Party (hereinafter referred to as a "Default Notice") which will specify: (i) the nature of the Event of Default; (ii) the action required to cure the Event of Default; (iii) a date by which the Event of Default will be cured, which will not be less than the applicable cure period set forth under Sections 5.2(B) and 5.2(C), below, or if a cure is not reasonably possible within the applicable cure period, to begin such cure and diligently prosecute such cure to completion. The Event of Default will constitute a breach of this Agreement if the defaulting Party fails to cure the Event of Default within the applicable cure period or any extended cure period allowed under this Agreement.

B. CONSULTANT will cure the Event of Default within the following time periods:

Within ten (10) business days of CITY's issuance of a Default Notice for any failure of CONSULTANT to timely provide CITY or CITY's employees or agents with any information and/or written reports, documentation or work product which CONSULTANT is obligated to provide to CITY or CITY's employees or agents under this Agreement.

Prior to the expiration of the 10-day cure period, CONSULTANT may submit a written request for additional time to cure the Event of Default upon a showing that CONSULTANT has commenced efforts to cure the Event of Default and that the Event of Default cannot be reasonably cured within the 10-day cure period. The foregoing notwithstanding, CITY will be under no obligation to grant additional time for the cure of an Event of Default under this Section 5.2(B)(i) that exceeds seven (7) calendar days from the end of the initial 10-day cure period; or ii. Within fourteen (14) calendar days of CITY's issuance of a Default Notice for any other Event of Default under this Agreement. Prior to the expiration of the 14-day cure period, CONSULTANT may submit a written request for additional time to cure the Event of Default upon a showing that CONSULTANT has commenced efforts to cure the Event of Default and that the Event of Default cannot be reasonably cured 13 Exhibit 2 79

within the 14-day cure period. The foregoing notwithstanding, CITY will be under no obligation to grant additional time for the cure of an Event of Default under this Section 5.2(B)(ii) that exceeds thirty (30) calendar days from the end of the initial 14-day cure period.

In addition to any other failure on the part of CONSULTANT to perform any duty, obligation, service or task set forth under this Agreement (or the failure to timely perform or properly perform any such duty, obligation, service or task), an Event of Default on the part of CONSULTANT will include, but will not be limited to the following: (i) CONSULTANT's refusal or failure to perform any of the services or tasks called for under the Scope of Work; (ii) CONSULTANT's failure to fulfill or perform its obligations under this Agreement within the specified time or if no time is specified, within a reasonable time; (iii) CONSULTANT's and/or its employees' disregard or violation of any federal, state, local law, rule, procedure or regulation; (iv) the initiation of proceedings under any bankruptcy, insolvency, receivership, reorganization, or similar legislation as relates to CONSULTANT, whether voluntary of involuntary; (v) CONSULTANT's refusal or failure to perform or observe any covenant, condition, obligation or provision of this Agreement; and/or (vii) CITY's discovery that a statement representation or warranty by CONSULTANT relating to this Agreement is false, misleading or erroneous in any material respect.

C. CITY will cure any Event of Default asserted by CONSULTANT within forty- five (45) calendar days of CONSULTANT's issuance of a Default Notice, unless the Event of Default cannot reasonably be cured within the 45-day cure period. Prior to the expiration of the 45-day cure period, CITY may submit a written request for additional time to cure the Event of Default upon a showing that CITY has commenced its efforts to cure the Event of Default and that the Event of Default cannot be reasonably cured within the 45-day cure period. The foregoing notwithstanding, an Event of Default dealing with CITY's failure to timely pay any undisputed sums to CONSULTANT as provided under Section 1.5, above, will be cured by CITY within five (5) calendar days from the date of CONSULTANT's Default Notice to CITY.

D. CITY, in its sole and absolute discretion, may also immediately suspend CONSULTANT's performance under this Agreement pending
CONSULTANT's cure of any Event of Default by giving CONSULTANT written notice of CITY's intent to suspend CONSULTANT's performance (hereinafter, a "Suspension Notice"). CITY may issue the Suspension Notice at any time upon the occurrence of an Event of Default. Upon such suspension, CONSULTANT will be compensated only for those services and tasks which have been rendered by CONSULTANT to the reasonable satisfaction of CITY up to the effective date of the suspension. No actual or asserted breach of this Agreement on the part of CITY will operate to prohibit or otherwise restrict CITY's ability to suspend this Agreement as provided herein.

E. No waiver of any Event of Default or breach under this Agreement will 14 Exhibit 2 80

constitute a waiver of any other or subsequent Event of Default or breach.

No waiver, benefit, privilege, or service voluntarily given or performed by a Party will give the other Party any contractual rights by custom, estoppel, or otherwise.

F. The duties and obligations imposed under this Agreement and the rights and remedies available hereunder will be in addition to and not a limitation of any duties, obligations, rights and remedies otherwise imposed or available by law. In addition to any other remedies available to CITY at law or under this Agreement in the event of any breach of this Agreement, CITY, in its sole and absolute discretion, may also pursue any one or more of the following remedies:
i. Upon written notice to CONSULTANT, the CITY may immediately terminate this Agreement in whole or in part;
ii. Upon written notice to CONSULTANT, the CITY may extend the time of performance;
iii. The CITY may proceed by appropriate court action to enforce the terms of the Agreement to recover damages for CONSULTANT's breach of the Agreement or to terminate the Agreement; or
iv. The CITY may exercise any other available and lawful right or remedy.

CONSULTANT will be liable for all legal fees plus other costs and expenses that CITY incurs upon a breach of this Agreement or in the CITY's exercise of its remedies under this Agreement.

G. In the event CITY is in breach of this Agreement, CONSULTANT's sole remedy will be the suspension or termination of this Agreement and/or the recovery of any unpaid sums lawfully owed to CONSULTANT under this Agreement for completed services and tasks.

5.3 SCOPE OF WAIVER: No waiver of any default or breach under this Agreement will constitute a waiver of any other default or breach, whether of the same or other covenant, warranty, agreement, term, condition, duty or requirement contained in this Agreement. No waiver, benefit, privilege, or service voluntarily given or performed by a Party will give the other Party any contractual rights by custom, estoppel, or otherwise.

5.4 SURVIVING ARTICLES, SECTIONS AND PROVISIONS: The termination of this Agreement pursuant to any provision of this Article or by normal expiration of its term or any extension thereto will not operate to terminate any Article, Section or provision contained herein which provides that it will survive the termination or normal expiration of this Agreement.
15 Exhibit 2 81

VI.

MISCELLANEOUS PROVISIONS

6.1 DOCUMENTS & DATA; LICENSING OF INTELLECTUAL PROPERTY: All Documents and Data will be and remain the property of CITY without restriction or limitation upon their use or dissemination by CITY. For purposes of this Agreement, the term "Documents and Data" means and includes all reports, analyses, correspondence, plans, designs, notes, summaries, strategies, charts, schedules, spreadsheets, calculations, lists, data compilations, documents or other materials developed and/or assembled by or on behalf of CONSULTANT in the performance of this Agreement and fixed in any tangible medium of expression, including but not limited to Documents and Data stored digitally, magnetically and/or electronically. This Agreement creates, at no cost to CITY, a perpetual license for CITY to copy, use, reuse, disseminate and/or retain any and all copyrights, designs, and other intellectual property embodied in all Documents and Data. CONSULTANT will require all subcontractors and subconsultants working on behalf of CONSULTANT in the performance of this Agreement to agree in writing that CITY will be granted the same right to copy, use, reuse, disseminate and retain Documents and Data prepared or assembled by any subcontractor or subconsultant as applies to Documents and Data prepared by CONSULTANT in the performance of this Agreement.

6.2 CONFIDENTIALITY: All data, documents, discussion, or other information developed or received by CONSULTANT or provided for performance of this Agreement are deemed confidential and will not be disclosed by CONSULTANT without prior written consent by CITY. CITY will grant such consent of disclosure as legally required. Upon request, all CITY data will be returned to CITY upon the termination or expiration of this Agreement. CONSULTANT will not use CITY's name or insignia, photographs, or any publicity pertaining to the Work in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of CITY.

6.3 FALSE CLAIMS ACT: CONSULTANT warrants and represents that neither CONSULTANT nor any person who is an officer of, in a managing position with, or has an ownership interest in CONSULTANT has been determined by a court or tribunal of competent jurisdiction to have violated the False Claims Act, 31 U.S.C., Section 3789 et seq. and the California False Claims Act, Government Code Section 12650 et seq.

6.4 NOTICES: All notices permitted or required under this Agreement will be given to the respective Parties at the following addresses, or at such other address as the respective Parties may provide in writing for this purpose:

CONSULTANT:

Bowman Infrastructure Engineers Ltd
3060 Saturn Street
Suite 250
Brea, CA 92821
CITY:

City of Bell Gardens
7100 S. Garfield Avenue
Bell Gardens, CA 90201
Attn: Director of Public
Works/Facilities
16 Exhibit 2 82

Attn: Sid Mousavi, MSCE, PE, Senior Phone: 562-806-7700 Principal
Phone: 714-940-0100
Such notices will be deemed effective when personally delivered or successfully transmitted by facsimile as evidenced by a fax confirmation slip or when mailed, forty-eight (48) hours after deposit with the United States Postal Service, first class postage prepaid and addressed to the Party at its applicable address.

6.5 COOPERATION; FURTHER ACTS: The Parties will fully cooperate with one another, and will take any additional acts or sign any additional documents as are reasonably necessary, appropriate or convenient to achieve the purposes of this Agreement.

6.6 SUBCONTRACTING: CONSULTANT will not subcontract any portion of the Work required by this Agreement, except as expressly stated herein, without the prior written approval of CITY. Subcontracts (including without limitation subcontracts with subconsultants), if any, will contain a provision making them subject to all provisions stipulated in this Agreement, including provisions relating to insurance requirements and indemnification.

6.7 CITY'S RIGHT TO EMPLOY OTHER CONSULTANTS: CITY reserves the right to employ other contractors in connection with the various projects worked upon by CONSULTANT.

6.8 PROHIBITED INTERESTS: CONSULTANT warrants, represents and maintains that it has not employed nor retained any company or person, other than a bona fide employee working solely for CONSULTANT, to solicit or secure this Agreement. Further, CONSULTANT warrants and represents that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for CONSULTANT, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, CITY will have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of CITY, during the term of his or her service with CITY, will have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

6.9 TIME IS OF THE ESSENCE: Time is of the essence for each and every provision of this Agreement.

6.10 GOVERNING LAW AND VENUE: This Agreement will be interpreted and governed according to the laws of the State of California. In the event of litigation between the Parties, venue, without exception, will be in the Los Angeles County Superior Court of the State of California. If, and only if, applicable law requires that all or part of any such litigation be tried exclusively in federal court, venue, without exception, will in the Central District of California located in the City of Los Angeles, California.
17 Exhibit 2 83

6.11 ATTORNEYS' FEES: If either Party commences an action against the other Party, legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing Party in such litigation will be entitled to have and recover from the losing Party reasonable attorneys' fees and all other costs of such action.

6.12 SUCCESSORS AND ASSIGNS: This Agreement will be binding on the successors and assigns of the Parties.

6.13 NO THIRD -PARTY BENEFIT: There are no intended third -party beneficiaries of any right or obligation assumed by the Parties. All rights and benefits under this Agreement inure exclusively to the Parties.

6.14 CONSTRUCTION OF AGREEMENT: This Agreement will not be construed in favor of, or against, either Party but will be construed as if the Parties prepared this Agreement together through a process of negotiation and with the advice of their respective attorneys.

6.15 SEVERABILITY: If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions will continue in full force and effect.

6.16 AMENDMENT; MODIFICATION: No amendment, modification or supplement of this Agreement will be valid or binding unless executed in writing and signed by both Parties, subject to CITY approval. The requirement for written amendments, modifications or supplements cannot be waived and any attempted waiver will be void and invalid.

6.17 CAPTIONS: The captions of the various articles, sections and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement.

6.18 INCONSISTENCIES OR CONFLICTS: In the event of any conflict or inconsistency between the provisions of this Agreement and any of the exhibits attached hereto, the provisions of this Agreement will control.

6.19 ENTIRE AGREEMENT: This Agreement, including all attached exhibits, constitutes the entire, complete, final and exclusive expression of the Parties with respect to the matters addressed herein and supersedes all other agreements or understandings, whether oral or written, which may have been entered into between CITY and CONSULTANT prior to the execution of this Agreement. Any statements, representations, or other agreements, whether oral or written, made by either Party that is not embodied herein will not be valid or binding on the Parties. No amendment, modification or supplement to this Agreement will be valid and binding unless in writing and duly executed by the Parties pursuant to Section

6.16, above.

6.20 FORCE MAJEURE: The Term shall be extended in the event of any delays due to unforeseeable causes beyond the control of CONSULTANT and without the 18 Exhibit 2 84

fault or negligence of CONSULTANT, including but not limited to severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the CITY. CONSULTANT shall within three (3) calendar days of the commencement of such delay notify the City Representative in writing of the causes of the delay.

The City Representative shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the City Representative such delay is justified. The City Representative's determination shall be final and conclusive upon the parties to this Agreement. In no event shall CONSULTANT be entitled to recover damages against the CITY for any delay in the performance of this Agreement, however caused, CONSULTANT's sole remedy being extension of the Agreement pursuant to this Section.

6.21 COUNTERPARTS: This Agreement may be executed in any number of counterparts, each of which shall be deemed an original, but all of which when taken together shall constitute one and the same instrument. No handwritten or typewritten amendment, modification or supplement to any one counterpart will be valid or binding unless made to all three counterparts in conformity with Section

6.16, above. One fully executed original counterpart will be delivered to CONSULTANT and two original counterparts will be retained by CITY. (SIGNATURES ON NEXT PAGE)
19 Exhibit 2 85

IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed the day and year first appearing in this Agreement, above.

CITY OF BELL GARDENS: BOWMAN INFRASTRUCTURE
ENGINEERS LTD.:

By: By:

Name: Name:

Title: Title:

Date:

APPROVED AS TO FORM:

Stephanie Vasquez, City Attorney
Date:
20 Exhibit 2 86

EXHIBIT "A"

CITY RFP
21 Exhibit 2 87

REQUEST FOR PROPOSALS
FOR

MUNICIPAL ENGINEERING SERVICES
ADDENDUM NO. 2
October 30, 2023
This addendum is being issued for the REQUEST FOR PROPOSALS FOR MUNICIPAL ENGINEERING SERVICES.

Submit a proposal for these services with the full understanding and full consideration of this addendum.

A. This addendum is being issued to make the following changes:

1. The Proposal submittal deadline is extended from 5:00 P.M. on Thursday, November 2, 2023, to 5:00 P.M. on Thursday, November 9, 2023.

2. In the Submittal Procedures/Deadline section, the tentative schedule is revised to read as follows:

Release of RFP
Tuesday, October 10, 2023
Deadline for Questions
Thursday, October 19, 2023 @ 5:00 p.m.

Response to Questions
Monday, October 30, 2023
Proposal Due Date
Thursday, November 9, 2023 @ 5:00 p.m.

Interviews with Proposers, if necessary
Tuesday, November 21, 2023
City Council Recommendation of Award
Monday, December 11, 2023
B. This addendum is being issued to incorporate the following Questions and Answers ("Q&A") into the RFP:

1. Q: Are firms required to submit a response for all the services (entire scope of work) or may they choose which service areas to respond to? We understand that it is the intent of the City to select a single Consultant to provide services? As stated in the RFC' it is the intent of the City to select a single Consultant to provide the requested municipal engineering services,' hoWeVer, the City reserves the right to se/arc/ one or more, Consultants to provider as -needed municipal engineeninq services through this RFC' Firms may chooser Which Scope of Work categories to respond to,- however, the City's preference is to select one firm (i.e., the same firm) to provide the services under Scope of Work categories A, (City Engineer Detainer), B, (As -Needed Traffic Engineer), C. (Public Works hermit

Page 1 of 4 ends

Exhibit 2 88

Addendum No. 2
RFP for Municipal Engineering Services

Page 2 of 4 ends

Management and Inspection), D, (s-Illororded Water Fnglnorer), E. (s-Illororded Development Fnglnorer), and I . (It PDE S Stor lArater Compliance ConsUltant Sornrlces), The City may select one or more firms to provider the sornrlces under Scope of Work categor.y F (As -Needed Public Works/CIP Project Design, Project Management & Administration, inistration, Funding Management, Construction Management, Construction Inspection, and I....abor Compliance Sornrlces).

2. Q: Our firm is unfamiliar with and has never been subjected to a fee structure that is based on a percentage of average construction low bid results. Please consider revising the method of compensation for As Needed Public Works / CIP Design, Project Management & Administration, Funding Management, Construction Management, Construction Inspection and Labor Compliance Services to Hourly rates, not -to -exceed a negotiated scope and allowance. The City's determination on this item may affect our ability to propose.

Submit a proposal In accordance with the RFP Method of Compensation and Proposal Format and Content Requirements sections,

3. Q: Can firms submit on some parts of the scope, or does the City want only comprehensive proposals for all scope items?
Refer to Answer to Question 1,

4. Q: How many contracts will be issued?
Unknown at this time,

5. Q: Is there any way for a further extension for the RFP due date — preferably to late November?
Refer to Section AJ of this addendum,

6. Q: Would the City consider an electronic only submittal rather than hard copy? Proposer must submit a proposal In accordance with the RFP SUbmittal ProcordurerslDeadllnor section,

7. Q: Should Attachment "B" —Acknowledgement of City's standard form Agreement be included with the proposal?
Mors.

8. Q: Does the City envision that this contract could be used to acquire support staff? Many other cities use the On -Call contract as a means of pulling in outside support staff when that need arises. Having staff support as a part of the On -Call RFPs not only gives flexibility but catalyzes competition that results in lower billing rates for those staff as well.

As stated In the RFP ' the City Is seeking proposals for various as -needed, 1. or., ova -call, municipal engineering sornrlces.

Exhibit 2 89

Addendum No. 2
RFP for Municipal Engineering Services

Page 3 of 4 ends

9. Q: The RFP mentions that the City has used private firms in the past for the services mentioned in the scope. What firms did the City use? Could the City share any estimate based on the historic data about the total number of personnel proposed or working currently along with the hourly rate and spending done on contract?
The City has previously contracted with Wil/dan and currently contracts with Infrastructure, Engineers, previously known asAdvanced Applied Engineering, for municipal engineering services.

10. Q: How many firms is the City planning on selecting? Is there a preference for firms who can provide all services listed in the scope?? The number of firms is unknown at this time. As stated in the RFC' it is the intent of the City to select a single Consultant to provide the requested municipal engineenIng services, however, the City reserves the right to select one or more Consultants to provide as -needed municipal engineering services through this RFP

11. Q: Please specify the total budget allocated for this contract? The total budget allocated for this contract is unknown at this time since the number of Capital Improvement program projects will vary; and the City has not determined hoer many contracts will be awarded,

12. Q: Do the services need to be delivered onsite or is there a possibility for remote operations and performance?
Services will be delivered onsite and remotely Refer to the RFP Scope of Work section.

13. Q: Please specify the anticipated start date of the project.

The anticipated effective date for the professional services agreement is December ll, 2023,

14. Q: Are escalations to hourly rates allowed?
As hart of their proposal, proposers may request an anneal adjustment to the hourly rates after the initial yeas; not to exceed the percentage change in the Consumer price Index for All Urban Consumers, I....os Angeles area, for the 12-month period ending September immediately preceding the agreement anniversary date. Any adjustment to the hourly rates WoUld take effect on January I..>r each .year

15. Q: Are there any CaIPERS concerns we should be aware of? The contracted firm(s) shall be responsible for any salaries and benefits of their respective employees as a direct result of providing the contracted municipal engineering services contained in this RFC' including any pension liabilities for employees of the fir (s). The contracted firm(s) shall not use any CaIPF S retirees for any of the services contained in this RFC' Exhibit 2 90

Addendum No. 2
RFP for Municipal Engineering Services

Page 4 of 4 ends

16. Q: Can firms apply for a portion of a category? For instance, Category F lists Project Design, Project Management & Administration, Funding Management, Construction Management, Construction Inspection, and Labor Compliance Services. Are we able to provide just project management services, or are we required to fulfill all services listed in the category? Flans arc, required to fulfill all sarnrlces listed within a respective, cafe o

17. Q: Since some of the scope is for as -needed services and positions, how does the City recommend listing out deliverables needed and creating a work plan showing proposed hours for each retainer service as required in section 2:

Methodology of the Proposal Format and Content Requirements.

It Is up the proposer to provider a methodology to address the components In than Scope of Work,

18. Q: Is there any special consideration given to small or disadvantaged businesses?
No.

Proposers who have already submitted their proposal will be contacted to arrange for return of their proposal.

Sincerely,
Bernardo Iniguez
Director of Public Works/Facilities
The Proposer shall individually identify and acknowledge receipt of this addendum by signing and enclosing a copy of this form in their proposal submittal. Failure to do so may result in disqualification of their proposal.

Signature of Proposer
Proposer Firm Name and Address
Date
Exhibit 2 91

C1`1 Y 0IIIII lull a ELL GAIRDENS
1:111YBI 1l11C WGRIKS D11]l3XII � I ME14T
82:1 ���Wfl��flA 90201-61221
327( 'VA[RFTF.. D]D AlA1v1B16.J[.' w BELL GAFIIJ ') E114S, CALU :, � 1 11.1
(562) 8067770 w��AX (562) 806-7789 a VIAN1101V BB,

REQUEST FOR PROPOSALS
FOR

MUNICIPAL ENGINEERING SERVICES
October 16, 2023
This addendum is being issued for the REQUEST FOR PROPOSALS FOR MUNICIPAL

ENGINEERING SERVICES
Submit a proposal for these services with the full understanding and full consideration of this addendum.

This addendum is being issued to make the following changes:

1. The Proposal submittal deadline is extended from 5:00 P.M. on Thursday, October 26, 2023 to 5:00 P.M. on Thursday, November 2, 2023.

2. In the Submittal Procedures/Deadline section, the tentative schedule is revised to read as follows:
. . . . .. . ...........

Release of RFP
Tuesday, 10, 2023
Deadline for Questions
-October
Thursday, October 19, 2023 @ 5:00 p.m.

Response to Questions
Thursday, October 26, 2023
Pmposal Due Date.

Thursday, November 2, 2023 5:00 00, M �. @-
Interviews with Proposers, if necessary
Tuesday, November 14, 2023
City_Council _Recommendation of Award
I Monday, December 11, 2023

3. In the Method of Compensation section, "Traffic Engineer Retainer" is revised to read "As -Needed Traffic Engineer," and the corresponding Compensation Method for this Work Item is revised from "Lump sum per month" to "Hourly rates." Sinqtrel
INS*,
B rn o In uez
Director of Public Works/Facilities
The proposer shall individually identify and acknowledge receipt of this addendum by signing and enclosing a copy of this form in his/her proposal submittal. Failure to do so may result in disqualification of his/her proposal.

Signature of Proposer
Date,,
Exhibit 2 Proposer Firm Name and Address 92

REQUEST FOR PROPOSALS
FOR

MUNICIPAL ENGINEERING SERVICES
RFP Release Date
Tuesday, October 10, 2023
Proposal Submittal Deadline
5:00 p.m., Thursday, October 26, 2023
Contact Person:

Bernardo Iniguez, Director of Public Works/Facilities
City of Bell Gardens
8327 Garfield Avenue
Bell Gardens, CA 90201
(562) 806-7770
biniguezO-bellgardens.org
7100 Garfield Avenue • Bell Gardens, CA 90201 • (562) 806-7700 • www.belIgardens.org Exhibit 2 93

TABLE OF CONTENTS
BACKGROUND AND GENERAL INFORMATION................................................................. 3 SUBMITTAL PROCEDURES/DEADLINE............................................................................... 3 DEFINITIONS, TERMS, AND CONDITIONS.......................................................................... 4 SCOPEOF WORK................................................................................................................ 12 METHOD OF COMPENSATION..............................................................................36 PROPOSAL FORMAT AND CONTENT REQUIREMENTS..................................................36 EVALUATION CRITERIA......................................................................................................39 ATTACHMENTS:

Attachment A — Proposal Price Sheet
Attachment B — Acknowledgement of City's Standard Form of Agreement Attachment C — Sample Professional Services Agreement
Exhibit 2 94

BACKGROUND AND GENERAL INFORMATION
The City of Bell Gardens (City) was incorporated on August 1, 1961, as a general law city, thus, it operates under the Council/Manager form of government. The five City Council members are elected at -large by registered voters in the City for staggered four-year terms and serve as the City's legislative, policy -making body. The Mayor position is shared among the Council members who select one another as Mayor annually. The City Council holds bi-monthly public meetings. The City Manager is responsible for directing City affairs as prescribed by the City Council. The City has a population of approximately 39,000 in an area of 2.4 square miles located in the southeastern part of Los Angeles County. The City shares a common boundary with the Cities of South Gate, Bell, Downey, and Commerce. The City is considered an integral part of the Los Angeles -Long Beach metropolitan area.

The City's departments include Finance and Administration, City Clerk, Community Development, Recreation and Community Services, Police, and Public Works. Fire services are provided by the Los Angeles County Fire Department.

The Public Works Department consists of various divisions, including Administration, Street Maintenance, Parks and Facilities Maintenance, Utilities and Contracts, Solid Waste Management, Transportation Services, and the City Water System. The Public Works Department also manages the City's Capital Improvement Program (CIP). The fiscal year 2023/2024 CIP budget consists of 25 CIP projects totaling approximately $43.7 million.

The City is seeking proposals from qualified firms with proven expertise to provide professional engineering contract services, including 1) City Engineer services retainer through a qualified California -licensed professional engineer who will serve as the City's designated "City Engineer;" 2) as -needed Traffic Engineer services; 3) Public Works permit management and inspection services; 4) as -needed Water Engineer services; 5) as -needed Development Engineer services; 6) as -needed Public Works/CIP project design, project management & administration, funding management, construction management and inspection, and labor compliance services; 7) as -needed other/additional Public Works engineering services; and 8) NPDES Stormwater Compliance Consultant services for the Public Works Department (collectively "municipal engineering services"). The City currently contracts out these municipal engineering services to a private firm and is seeking to re-evaluate costs and qualifications.

Please review this Request for Proposals for Municipal Engineering Services (RFP) outlining the range of services being sought to determine if you wish to submit a proposal for the requested services.

It is the intent of the City to select a single Consultant to provide the requested municipal engineering services; however, the City reserves the right to select one or more Consultants to provide as -needed municipal engineering services either through this RFP or through subsequent solicitations for as -needed municipal engineering services. The term of the Agreement will be for three (3) years with up to two (2) optional one-year extensions.

SUBMITTAL PROCEDURES/DEADLINE
An electronic version of the proposal shall be emailed to cityclerkdesk(cD-bel/gardens.org and biniguez(cD_bel/gardens.org no later than 5:00 p.m. on Thursday, October 26, 3 Exhibit 2 95

2023. Additionally, three hard copy sets of the proposal (two (2) bound, one (1) unbound) shall be mailed no later than 5:00 p.m. on Thursday, October 26, 2023, to the City Clerk's Office. The electronic version of the proposal must be an exact duplicate of the hard copies and the subject line must read "City of Bell Gardens Proposal for Municipal Engineering Services". If the proposal includes any comments over and above the specific information requested in this RFP, such information should be included as a separate appendix and placed at the end of the proposal.

Postmarks by this date are unacceptable and no facsimiles will be accepted. Please mail or deliver your response in a sealed envelope with "City of Bell Gardens Proposal for Municipal Engineering Services" written below the address label and addressed as follows:

City Clerk's Office
Attention: Daisy Gomez, City Clerk
Municipal Engineering Services RFP Response
City of Bell Gardens
7100 Garfield Avenue
Bell Gardens, CA 90201
Questions and Inquiries
To ensure a fair and objective RFP process and evaluation, all questions and inquiries related to this RFP shall be addressed in writing to Bernardo Iniguez, Director of Public Works/Facilities, at bin iguez(a)bellgardens.org. The deadline for written questions and inquiries is Tuesday, October 17, 2023 at 5:00 p.m. City Hall is open Monday through Thursday from 7:30 AM to 6:00 PM.

The tentative schedule for this RFP is as follows:

Release of RFP
Tuesday, October 10, 2023
Deadline for Questions
Tuesday, October 17, 2023 @ 5:00 p.m.

Response to Questions
Thursday, October 19, 2023
Proposal Due Date
Thursday, October 26, 2023 @ 5:00 p.m.

Interviews with Proposers, if necessary
Wednesday, November 1, 2023
City Council Recommendation of Award
Monday, November 13, 2023

DEFINITIONS, TERMS, AND CONDITIONS
Definitions: To simplify and clarify the language throughout this RFP, the following definitions shall apply:

City Council: The elected officials of the City of Bell Gardens, who have been given the authority to exercise such powers and jurisdiction on all City business as conferred by the State Constitution and the City of Bell Gardens Municipal Code.

Agreement: An agreement between the City and the selected Consultant to furnish professional services over a designated period.
4 Exhibit 2 96

Consultant: The bidder, contractor, vendor, firm, company, proposer, organization, or individual offering a proposal in response to this RFP.

Proposal General Terms and Conditions:

RFP General Conditions
Consultants should be aware that the RFP and the contents of the successful proposal will become a part of any subsequent contractual documents that may arise from this RFP.

Following the Proposal Submission Deadline, the City, pursuant to the California Public Records Act (Govt. Code Section 6250 et seq.) reserves the right to make copies of all submitted proposals available for inspection and copying by any interested member of the public, except to the limited extent the City determines that any information contained in a proposal is legally privileged under the California Public Records Act. By submission of a proposal, Consultants acknowledge and agree that their proposal and any information contained therein may be disclosed by the City to interested members of the public, including other proposers. All responses to the RFP received become a matter of public record and shall be regarded as public records, except for those elements in each proposal which are defined by the Proposer as business or trade secrets and plainly marked as "Confidential," "Trade Secret," or "Proprietary." The City shall not in any way be liable or responsible for the disclosure of any such proposal or portions thereof, if they are not plainly marked as "Confidential," "Trade Secret," or "Proprietary" or if disclosure is required under the Public Records Act. Any proposal which contains language purporting to render all or significant portions of the proposal "Confidential," "Trade Secret," or "Proprietary" shall be regarded as non -responsive.

Proposal Validity
All proposals, with associated costs, shall be considered valid and binding on the Consultant for a period of ninety (90) days after the proposal due date.

Electronic Documents
Consultants may be supplied with the original RFP documents in electronic form to aid in the preparation of proposal(s). By accepting these electronic documents, each Consultant agrees not to edit or change the language or format of these documents. Submission of a proposal by a Consultant signifies full agreement with this requirement.

Receipt of Proposals
Submitted proposal(s) must be properly addressed and received by the City prior to the date and time specified. The mere fact that the proposal was dispatched will not be considered; the Consultant must ensure that the proposal is delivered.

Proposals received after the date and time specified shall be returned and will be considered void and unacceptable. The City is not responsible for the lateness of the mail carrier, etc.; and the time/date stamp of receipt by the City Clerk's Office shall be the official time of receipt. 5 Exhibit 2 97

Alterations
Proposal documents cannot be physically altered or amended after the closing date. Alterations made before closing must be initialed by the Consultant to guarantee authenticity. Proposals may not be withdrawn after the proposal closing date, and each Consultant agrees to this stipulation upon submittal of its proposal. However, all proposals are subject to negotiation before an agreement is awarded as further described below.

Point of Contact and Communication
The Director of Public Works/Facilities is the designated "Point of Contact" for this RFP.

Proposers must only communicate with the Point of Contact during the RFP submission and procurement process. Communications initiated by proposers to this RFP with members of the City Council, or officers, personnel or employees of the City, other than via the Point of Contact, may be grounds for disqualification. Any inquiries or requests during this RFP submission and procurement process shall be submitted in writing to the Point of Contact as follows:

City of Bell Gardens
Attention: Bernardo Iniguez, Director of Public Works/Facilities 8327 Garfield Avenue
Bell Gardens, CA 90201
(562) 806-7770
Email: [email protected]
The City shall not be responsible for any verbal communication between any employee of the City and any proposed Consultant outside of the communication procedures established in this RFP. Only written requirements and qualifications will be considered. No oral statement of any person shall modify or otherwise change, or affect the terms, conditions, or specifications stated in the resulting contract.

Proposers and proposers' representatives may not communicate with the City Council members about this RFP. In addition, proposers and proposers' representatives may not communicate outside the procedures set forth in this RFP with an officer, employee or agent of the City regarding this RFP until after Agreement Award. However, proposers and their representatives are not prohibited from making oral statements or presentations in public to one or more representatives of the City during a public meeting.

A "proposer" or "proposer's representative" includes all of the proposer's employees, officers, directors, Consultants and agents, any subcontractors or suppliers listed in the proposer's proposal, and any individual or entity who has been requested by the proposer to contact the City on the proposer's behalf.
6 Exhibit 2 98

Reservations
The City reserves the right to accept or reject any or all responses received in response to this RFP. The City also reserves the right to waive any informality, technical defect or clerical error or irregularity in any response. The City's potential award of an agreement will not be based on any single factor, nor will it be based solely or exclusively on the lowest cost proposal. If an agreement is awarded, the award will be to the Consultant or Consultants who in the judgment of the City have presented an optimal balance of relevant experience, price, quality of service, work history and other factors which the City may consider relevant and important in determining which proposals are best for the City. Additionally, the City may, for any reason, decide not to award any agreements based on this RFP. The City reserves the right to cancel or modify this RFP. The City shall not be obligated to respond to any responses submitted, nor be legally bound in any manner by the submission of the response. The City reserves the right to negotiate deliverables and associated costs. There is no guarantee that the City will award an agreement.

Reimbursements
The Consultant shall be solely and exclusively responsible for all costs incurred in connection with the preparation and submission of the proposals; demonstrations; interviews; preparation of responses to questions and requests for additional information; for contract discussions; or for anything in any way related to this RFP. The City is not liable for any costs incurred by a proposer in response to this RFP. Whether or not a Consultant is awarded an Agreement pursuant to this RFP, no proposer shall be entitled to reimbursement for any costs or expenses associated with the Consultant's participation in this RFP process.

Certification
Any proposal that does not contain all the information requested in this RFP will be considered incomplete and may be rejected by the City.

Funding
The City operates and is funded on a fiscal yearly basis. Accordingly, the City reserves the right to terminate, without any liability, any Agreement for which funding is not available.

Negotiations
Negotiations may be conducted with responsible Consultants who submit proposals that are reasonably susceptible of being selected. All Consultants reasonably susceptible of being selected based on criteria set forth in this RFP may be given an opportunity to make a presentation and/or interview. Although this process will ultimately result in the award of a single Agreement, the City reserves the right to negotiate an Agreement with more than one firm.
7 Exhibit 2 99

Additional Information
During the proposal evaluation process, the City reserves the right, where it may serve the City's best interest, to request additional information or clarifications from Consultants. The City also reserves the right to investigate the qualifications of the proposed Consultant(s) as it deems appropriate.

Award of Agreement
Award of any agreement resulting from this RFP will be by the City Council at a public meeting.

State and Federal Requirements
Since some of the City's projects and programs are funded through State or federal funds, the selected Consultant will comply with any applicable State or federal provisions, including but not limited to, the Community Development Block Grant (CDBG) Contract and Federal Provisions, which include Non-discrimination and Equal Employment Opportunity requirements, Conflict of Interest requirements, County Lobbying Certification, Warranty of Compliance with County's Defaulted Property Tax Reduction Program, and Federal Lobbying Certification. Also, if applicable, selection of the Consultant will comply fully with the requirements of OMB Circular A-102 and all other federal procurement standards.

During the performance of the Agreement, the selected Consultant will agree to comply with the following CDBG Contract and Federal provisions:

1. Non -Discrimination and Equal Employment Opportunity A. The Consultant shall not discriminate as to race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition, or sexual orientation, in the performance of its services and duties pursuant to this Agreement, and will comply with all rules and regulations of City relating thereto. Such nondiscrimination shall include but not be limited to the following: employment, upgrading, demotion, transfers, recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.

B. The Consultant will, in all solicitations or advertisements for employees placed by or on behalf of Consultant state either that it is an equal opportunity employer or that all qualified applicants will receive consideration for employment without regard to race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition, or sexual orientation.

C. Consultant will cause the foregoing provisions to be inserted in all subcontracts for any work covered by this Agreement except contracts or subcontracts for standard commercial supplies or raw materials.

D. Executive Order 11246 requires that during the performance of this Agreement, Consultant agrees not to discriminate against any employee or applicant for 8 Exhibit 2 100

employment because of race, religion, sex, color or national origin. Consultant will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, color or national origin. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer, rates of pay or other forms of compensation, and selection for training, including apprenticeship.

Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the Consultant setting forth the provisions of this nondiscrimination clause.

E. Section 3 of the Housing and Community Development Act of 1968, as amended, 12 U.S.C. 1701 et seq., requires that, to the greatest extent feasible, opportunities for training and employment be given to lower income residents of the project area and contracts for work in connection with the project be awarded to business concerns which are located in or owned in substantial part by persons residing in the area of the project.

F. Title VI of the Civil Rights Act of 1964 provides that no person shall, on the ground of race, color or national origin, be excluded from participation in, be denied the benefits of, or be subject to discrimination under any program or activity receiving federal financial assistance.

G. Section 109, Title I of the Housing and Community Development Act of 1974 provides that no person shall, on the grounds of race, color, national origin, or sex be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program of activity funded in whole or in part with funds made available under this title.

H. Any prohibition against discrimination on the basis of age under the Age Discrimination Act of 1975, or with respect to an otherwise qualified disabled individual, as provided in Section 504 of the Rehabilitation Act of 1973, shall also apply.

2. Conflict of Interest
The Consultant, its agents and employees shall comply will all applicable Federal, State and County laws and regulations governing conflict of interest including, but not limited to, 24 CFR Section 570.611 and 24 CFR Part 85, Section 85.36(b). The Consultant agrees to incorporate the language found in this Section, Conflict of Interest, in contracts using CDBG funds and subject to compliance with conflict of interest Federal, State and County laws.

The general rule shall be that no person described in the Persons covered section below of this Section, Conflict of Interest, who exercise, or has exercised any function or responsibilities with respect to CDBG activities, or who is in a position to participate in a decision making process or gain inside information with regards to such activities, may obtain a financial interest or benefit from a CDBG-assisted activity, or have a financial interest in any contract, subcontract, or agreement with respect to CDBG-assisted activity, or with respect to the proceeds of the CDBG-assisted activity, either for themselves or those with whom they have 9 Exhibit 2 101

business or immediate family ties, during their tenure or for one year thereafter.

Persons covered -The conflict of interest provisions of this Section, Conflict of Interest, shall apply to any person who is an employee, agent, consultant, officer, or elected official or appointed official of the City, or of any designated public agencies, or of any subrecipients that are receiving CDBG funds.

The Consultant represents, warrants and agrees that to the best of its knowledge, it does not presently have, nor will it acquire during the term of the Contract, any interest direct or indirect, by contract, employment or otherwise, or as a partner, joint venture or shareholder (other than as a shareholder holding a one (1 %) percent or less interest in publicly traded companies) or affiliate with any business or business entity that has entered into any contract, subcontract or arrangement with the County or County of Los Angeles Community Development Commission.

Upon execution of this Contract and during its term, as appropriate, the Consultant shall, disclose in writing to the County any other contract or employment during the term of this Contract by any other persons, business or corporation in which employment will or may likely develop a conflict of interest between the County's and/or Commission's interest and the interests of the third parties.

3. Records and Audits
The Consultant shall maintain accounts and records, including personnel, property and financial records, adequate to identify and account for all costs pertaining to this Agreement and such other records as may be deemed necessary by the CITY to assure proper accounting for all project funds, both federal and non-federal shares. These records will be made available for audit purposes to the CITY or any authorized representative, and will be retained five (5) years after the expiration of this Agreement unless permission to destroy them is granted by the CITY. (24 CFR Part 84, Sec. 84.53)

4. County Lobbying Certification
The Consultant certifies that:

A. It is understood that each person/entity/firm who applies for a Community Development Commission contract, as part of that process, shall certify that they are familiar with the requirements of the Los Angeles County Code Chapter

2.160, (Los Angeles County Ordinance 9.-0031) and;
B. That all persons/entity/firm who seek a contract with the Community Development Commission shall be disqualified therefrom and denied that contract and, shall be liable in civil action, if any lobbyist, lobbying firm, lobbyist employer or any other person or entity acting on behalf of the above named firm fails to comply with the provisions of the County Code.

5. Consultant's Warranty of Compliance with County's Defaulted Property Tax Reduction Program:
10 Exhibit 2 102

A. The Consultant acknowledges that the County has established a goal of ensuring that all individuals and businesses that benefit financially from the County through contract are current in paying their personal and real property tax obligations (secured and unsecured roll) in order to mitigate the economic burden otherwise imposed upon the County and its taxpayers. Unless the Consultant qualifies for an exemption or exclusion, the Consultant warrants and certifies that to the best of its knowledge it is now in compliance, and during the term of this Agreement will maintain compliance, with the County's Defaulted Tax Program, found at Los Angeles County Ordinance No. 2009-0026 and codified at Los Angeles County Code, Chapter 2.206.

B. Failure of the Consultant to maintain compliance with the requirements set forth in the "County's Defaulted Property Tax Reduction Program " shall constitute default under this Agreement. Without limiting the rights and remedies available to the City under any other provision of this Agreement, failure of the Consultant to cure such default within 10 days of notice shall be grounds upon which the City may suspend or terminate this Agreement pursuant to the County's Defaulted Property Tax Reduction Program found at Los Angeles County Ordinance No. 2009-0026 and codified at Los Angeles County Code, Chapter 2.206.

6. Federal Lobbying Certification
The Consultant certifies that:

A. No Federal appropriated funds have been paid or will be paid, by or on behalf of the Consultant, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, and officer or employee of Congress, or an employee of any Member of Congress in connection with the awarding of any Federal contract, the making of any cooperative agreement, and the extension, continuation renewal, amendment, or modification of any Federal contract, grant, loan or cooperative agreement.

B. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the Consultant shall complete and submit Standard Form-LLL, "Disclosures Form to Report Lobbying", in accordance with its instructions.

C. The Consultant shall require that the language of this certification be included in all subcontracts and that all subcontracts shall certify and disclose accordingly.

Familiarity with Caltrans Local Assistance Procedures Manual The Consultant shall be familiar with the Caltrans Local Assistance Procedures Manual (LAPM) as demonstrated by experience on projects processed through the Caltrans Local Assistance Program. Projects financed in whole or in part with federal funds are also subject to Title 49 of the Code of Federal Regulations, Part 26, "Participation by Disadvantaged Business 11 Exhibit 2 103

Enterprises in Department of Transportation Financial Assistance Programs." The Consultant shall ensure that the Disadvantaged Business Enterprise Participation Level (DBE Goal) for each project is calculated and adhered to, either through meeting the goal or demonstrating a good faith effort to meet the goal. The Consultant will be required to adhere to any new federal requirements during the term of the Agreement.

Labor Compliance
The selected Consultant will comply with any applicable State or federal labor compliance requirements, including the paying of prevailing wages to certain classifications performing work under an agreement awarded as a result of this RFP, if the State Department of Industrial Relations (DIR) or a federal agency require the paying of such prevailing wages to certain classifications during the term of the agreement.

Consultant Dress Code, Appearance, and Equipment
The selected Consultant shall require each of its employees to adhere to industry standards of work ethic and attire. Shirts shall be worn at all times and shall be buttoned and tucked in. The Consultant's employees shall have shirts with the Consultant's company logo or wear Consultant -issued identification cards at all times while performing work on behalf of the City.

No caps with insignias or designs other than the Consultant's logo may be worn and no caps shall be worn backwards. The Consultant shall provide its employees all of the necessary equipment, vehicles, and apparatus needed to perform the services contained in this RFP.

SCOPE OF WORK
The primary goal of this RFP is to solicit proposals from qualified Consultants who can assist the City with municipal engineering services.

The Scope of Work is as follows:

A. City Engineer Retainer
The firm will provide a qualified individual to serve as the City's designated "City Engineer," who will report directly to the Director of Public Works/Facilities. The City Engineer shall be a registered professional civil engineer in the State of California for at least the past ten (10) years and have been assigned to serve the role of City Engineer in a California municipality within the past three (3) years. The retainer hours will be eighty (80) hours per month, with four (4) hours of regular weekly office hours at the Public Works Maintenance Yard office on Tuesdays and Thursdays from 1:00 p.m. to 5:00 p.m. For the remaining monthly retainer hours, the City Engineer will be available off -site for electronic or telephone communication with City staff, public officials, community leaders, developers, contractors, utilities, public agencies, and the general public. The City Engineer's tasks may include, but not be limited to, the following:

1. Attend public meetings including, but not limited to, meetings of the City Council, Planning Commission, and Traffic and Safety Commission; and staff level meetings 12 Exhibit 2 104

with City staff, public officials, community leaders, developers, contractors, utilities, public agencies, and the general public.

2. Analyze the City's needs and prepare, recommend, and administer long- and short-range programs consistent with the economic capabilities of the City. This includes preparation of any and all documentation related to the City's annual Capital Improvement Program (CIP) project budgets.

3. Identify current and future CIP projects, recommend those future CIP projects to the Director of Public Works/Facilities for inclusion in the upcoming fiscal year's CIP project budget, and document budget, scope, schedule, status, organizational responsibility (including other Professional Engineering Firms) and funding sources for CIP projects.

4. Conduct bi-weekly CIP Update meetings, tracking all CIP projects, including current status, funding/budget status, and provide a bi-weekly CIP project report to the Director of Public Works/Facilities; coordinate with City staff and various consultants to deliver the City's CIP projects; and assist the Director of Public Works/Facilities with the management of the City's CIP including managing design consultants, consultant project managers, and consultant construction managers.

5. Review and comment on private development projects including private development construction plans, site plans, or subdivision maps for compliance with City adopted design standards, subdivision standards, including, but not limited to, review of the following:
a. Map Plans: Review tentative maps, final maps, easement deeds and lot line adjustments, and comply with the Conditions of Approval as set by City staff, City commissions, and the City Council. Consultant shall check and review map boundaries, metes and bounds, and field check final documentation prior to bond exoneration.
b. Hydrology and Hydraulics Plans: Review hydrology and hydraulic studies in compliance with Los Angeles County Drainage Design Standards, Hydrology Manuals, Local Drainage Manuals, and utilize appropriate Hydrology and Hydraulics software programs.
c. Street Improvement Plans: Review street, drainage, and traffic control plans in compliance with the following: City standards, Standard Plans and Specifications for Public Works Construction (Greenbook), MUTCD, Caltrans Highway Design Manual, Caltrans Traffic Manual, Caltrans Standard Plans and Specifications, Los Angeles County Hydrology Manuals, Local Drainage Manuals, the Americans with Disabilities Act, and California Title 24 requirements.
d. Structural Improvement Plans and calculations.

6. Provide general engineering consultation in connection with problems such as traffic 13 Exhibit 2 105

congestion, need for traffic calming, parking issues, street signs programs, water services, etc.

7. Recommend policies, regulations and/or ordinances pertaining to engineering matters.

8. Provide technical advice for the City's personnel assigned to Public Works maintenance activities.

9. Advise the City regarding engineering, construction financing, and grant funding opportunities available from other governmental agencies and, when so directed, prepare and initiate applications for such funding opportunities.

10. Make recommendations pertaining to land development project control.

11. Establish working relationships and coordination with all other public agencies and private utilities involving engineering matters affecting City.

12. Conduct field investigations of various engineering issues.

13.Assist the City with the processing of required federal, state and regional permits.

14.Assist the City with processing grant applications and administration of awarded grants.

15. Perform miscellaneous engineering tasks, feasibility studies, investigations, and other duties as directed by the Director of Public Works/Facilities.

16. Establish working relationships with adjacent agencies, utilities, federal, state and regional agencies, and special districts.

B. As -Needed Traffic Engineer
The firm will provide a qualified individual to serve as the City's designated "City Traffic Engineer" on an as -needed basis. The City Traffic Engineer shall be a registered professional traffic engineer in the State of California for at least the past ten (10) years and have been assigned to serve the role of City Traffic Engineer in a California municipality within the past three (3) years. The City Traffic Engineer's tasks may include, but not be limited to, the following:

1. Advise and assist City's departments, commissions, committees, and the City Council on various traffic related issues and provide interface with regional and State transportation agencies.

2. Assess the potential traffic impact of proposed development/redevelopment projects.

3. When requested by the Director of Public Works/Facilities (or his/her designee), prepare engineering reports to the Traffic and Safety Commission in response to 14 Exhibit 2 106

requests for traffic control device installations and modifications, including, but not limited to, stop signs, crosswalks, traffic channelization, speed humps/bumps, parking restrictions, and speed zones; disabled parking requests; permit parking district requests; and any other traffic -related matters within the purview of the Traffic and Safety Commission.

4. Prepare grant applications for funding from federal, state, and regional/local agencies for traffic safety studies and improvements.

5. Identify, review, and develop recommendations for corrective measures at locations experiencing accident rates higher than normally anticipated.

6. Provide technical advice to City's staff in connection with the maintenance and operation of City's traffic signal facilities.

7. Conduct or review traffic engineering, traffic analysis, speed analysis, and transportation planning studies or project -specific traffic -related issues.

8. Provide comprehensive analyses of existing and projected traffic conditions.

9. Provide electronic traffic control device studies and design including, but not limited to, signs, signals, pavement markings, pedestrian flashers, and rectangular rapid flashing beacons.

10. Perform pedestrian studies including those to provide safe routes to school.

11. Review subdivision or new development projects involving traffic impact analyses.

12. Ensure compliance with traffic standards including, but not limited to, the CA Manual on Uniform Traffic Control Devices (CA MUTCD).

13. Perform miscellaneous traffic engineering services.

C. Public Works Permit Management and Inspection
The firm will provide a qualified individual to serve as the City's designated "Public Works Inspector." The Public Works Inspector shall have at least five (5) years of experience conducting public works inspections for municipal right-of-way or encroachment permits, and have performed public works inspection services in a California municipality within the past twelve (12) months. The Public Works Inspector will be available for eighty (80) hours per month, with office hours at the Public Works Maintenance Yard office from 8:00 a.m. to 10:00 a.m., Monday through Thursday, for permit management, processing, issuance, and counter inquiries; and field hours in the City for inspections and other site visits from 10:00 a.m. to 1:00 p.m., Monday through Thursday. The Public Works Inspector's tasks may include, but not be limited to, the following:
15 Exhibit 2 107

Receive, review, process Public Works permit applications; assess permit fees; and issue permits to applicants.

2. Handle public works permit and other engineering -related matters and inquiries al the Public Works Maintenance Yard office, including responding to inquiries from permittees or potential permit applicants.

3. Provide construction inspection/observation of permit work within the public right-of- way, including issuing correction notices, if necessary, and closing out finaled perm its.

4. Provide a daily schedule of inspections to the Director of Public Works/Facilities.

5. Issue stop work notices for unpermitted work.

6. Maintain a log of Public Works permits, showing the permit status.

7. Ensure permittees are complying with minimum construction BMPs to prevent construction debris from entering the storm drain system.

D. As -Needed Water Engineer
The firm will provide as -needed water engineering services through a qualified Water Engineer at the request of the Director of Public Works/Facilities (or his/her designee).

The Water Engineer shall be a registered professional civil engineer in the State of California for at least the past ten (10) years and have performed Water Engineer services in a California municipality within the past three (3) years. The Water Engineer's tasks may include, but not be limited to, the following:

1. Attend meetings regarding the City's Water System.

2. Review water policy issues for the City.

3. Assess the potential impact of proposed development and/or redevelopment projects on the City's Water System.

4. Prepare water studies, water master plans, water conservations plans, or other similar water -related plans.

5. Provide technical advice to City staff regarding the maintenance and operation of the City's water system.

6. Review potential regulations impacting the City's Water System. 16 Exhibit 2 108

7. Provide technical memorandums on recommended water treatment systems including, but not limited to, treatment for PFAS, metals, and other compounds or pollutants of concern affecting water quality.

E. As -Needed Development Engineer
The firm will provide as -needed development engineering services through a qualified Development Engineer at the request of the Director of Public Works/Facilities (or his/her designee). The Development Engineer shall be a registered professional civil engineer in the State of California for at least the past ten (10) years and have performed Development Engineer services in a California municipality within the past three (3) years. The Development Engineer's tasks may include, but not be limited to, the following:

1. Attend public meetings including, but not limited to, meetings of the City Council and Planning Commission; and meetings with City staff, public officials, community leaders, developers, contractors, and the general public.

2. Review and comment on planning programs and land development projects.

3. Provide general engineering consultation in connection with the business of the Community Development Department/Planning Division.

4. Review tentative and final tract and parcel maps, site plans, and other submittals for developments and make recommendations as to engineering matters until final action is taken by the City.

5. Review, check, and approve land divisions.

6. Check all improvement plans prepared by private developers for facilities under the jurisdiction of the City.

7. Establish performance and labor and material bond amounts when required and require posting of such securities and other development fees within the proper time sequence of such development review.

8. Provide field inspection during construction of such improvements by private developers and at the proper time, recommend notices of completion and acceptance of work.

9. Provide such necessary and related functions as are normal practice of the City in the City engineering review of private developments.
17 Exhibit 2 109

F. As -Needed Public Works/CIP Project Design, Project Management & Administration, Funding Management, Construction Management, Construction Inspection, and Labor Compliance Services
The firm will provide as -needed Public Works/CIP project design, project management & administration, funding management, construction management and inspection, and labor compliance services through qualified individuals at the request of the Director of Public Works/Facilities (or his/her designee). The firm's design phase and construction phase staff must each have at least five (5) years of experience of providing design phase and construction phase engineering services to municipalities in California and have performed these services for California municipalities within the past twelve (12) months. Plans, specifications, engineering reports and/or studies must contain a valid registered professional engineer/architect stamp from Consultant's staff, who shall be registered professionals in the State of California. The firm's tasks may include, but not be limited to, the following:

1. Public Works/CIP Project Design Services:
a. General Design Services
Prepare preliminary and final design for Public Works/CIP projects, including, but not limited to, plans, specifications, design calculations, analyses and project design schedules as required by the conditions on the respective project.

Prepare plans and specifications in accordance with a format appropriate for the respective project including, but not limited to, City standard plans and specifications, "Greenbook" Standard Specifications for Public Works Construction and Standard Plans for Public Works Construction, Caltrans standards, or Construction Specifications Institute (CSI) standards. iii. Conduct all field, topographic, and control surveys; prepare all geotechnical studies and reports; obtain title reports for adjacent properties as required; and include survey by a licensed surveyor of all property lines and easements for anticipated right-of-way and easement acquisitions. All topographic survey, property lines, and easements shall be mapped and accurately provided in AutoCAD format for use during design.
iv. Provide 30% conceptual plans, as well as 60%, 90%, and 100% plans, specifications, and estimate (PS&E) submittal packages for City review. v. Prepare project cost estimates and perform field reviews as needed. vi. Perform peer review services for general compliance. vii. Prepare utility coordination letters and coordinate with all utilities to obtain existing utility record plans, as-builts, schematics, etc. The existing utility information shall be shown on the final design plans.
18 Exhibit 2 110

viii. Prepare feasibility studies as needed.
ix. Prepare final bid documents incorporating all comments from previous reviews. Final plans shall be plotted electronically to PDF in full size, and shall be signed by the engineer in responsible charge licensed in the State of California.
x. Attend pre -bid meetings to address any questions about the project.

A. Assist in the preparation of any necessary addenda that may be required. xii. Review and respond to contractors Requests for Information as well as review and approve submittals.
xiii. Attend pre -construction meetings.
xiv. Review, prepare and approve shop drawings.
xv. Coordinate with pertinent regulatory agencies, stakeholders, material and equipment suppliers and assist the City with obtaining approvals and permits as may be required from applicable agencies including, but not limited to, Los Angeles County, Metropolitan Water District, Metropolitan Transportation Authority, Caltrans, or other federal, state, regional, and local agencies. b. Land Surveying
Provide field and office land surveying services for the construction of municipal improvements including, but not limited to, facilities, streets, traffic signals, walls, bridges, trails, storm drains, channels, and utilities. All work is to be performed under the direct supervision and charge of a registered land surveyor in the State of California.
ii. Land surveying services may include the following:

1. Monument perpetuation in compliance with California Business and Professions Code, Section 8771

2. Geographical Positioning Systems (GPS)

3. Topographical and preliminary design surveys

4. Aerial Photography

5. Construction survey staking and earthwork

6. "As built" surveys/plans of completed improvements

7. Title and records research for right-of-way engineering, property acquisitions, dedications, vacations, and boundary surveys

8. Preparation of legal descriptions for easements, dedications, and leases

9. Preparation of survey records, corner records, parcel maps, tract maps, and lot line adjustments
19 Exhibit 2 111

c. Environmental Compliance and Permitting
The Consultant shall be responsible for determining all environmental or jurisdictional permits and clearances required to deliver the respective project.

Based on the assessment, the Consultant shall prepare, submit all required permit applications, environmental review documentation, and related documents for processing by the City; and obtain all required environmental or jurisdictional permits required by federal, state, local, and jurisdictional agencies to ensure the project is cleared for construction.

The Consultant shall prepare appropriate California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) documentation and any associated technical studies, if applicable, that are required to clear the project for construction. The documentation may include, but not be limited to, the following:

1. Initial Study

2. Mitigated Negative Declaration

3. Negative Declaration

4. CEQA/NEPA Compliance

5. Environmental Impact Statement/Environmental Impact Report

6. Biological Assessment

7. Regulatory agency permitting
iii. The Consultant shall prepare a schedule of permits with the required timelines to ensure each permit is obtained prior to the start of construction. iv. The Consultant shall prepare all environmental documents in preliminary and final draft stages for City review, and shall incorporate any comments made during the preliminary document review.
v. If applicable, the Consultant shall coordinate and manage the environmental document approval process, including all public review and hearings that may be required.
d. Geotechnical Engineering and Materials Testing
i. The Consultant shall provide Geotechnical Engineering and Materials Testing Services including, but not be limited to, the following:

1. Laboratory testing

2. Materials sampling and field testing

3. Drilling/subsurface exploration; pavement coring

4. Geophysical Investigation

5. Pavement rehabilitation evaluation/recommendation; identify pavement dig -out areas for pavement resurfacing projects.

6. Geological/Geotechnical Engineering

7. Source Inspection Quality Management Plan (SIQMP) Reports 20 Exhibit 2 112

8. Materials/Foundation/Geotechnical Design Reports

9. Soils Reports

10. Specialty Testing
e. Landscape Architectural Services
The Consultant shall provide Landscape Architect Services for City parks, trails, street medians and parking lots, including dog parks and other approved park projects, through a California -licensed landscape architect in the State of California for at least the past ten (10) years and have performed landscape architectural services in a California municipality within the past three (3) years.

These services will include, but not be limited to, the following:

1. Landscape architecture, including preparation of plans, specifications, estimates, and scheduling.

2. Complete data collection including, but not limited to, file review, General Plan review, scoping meetings, boundary and topographic surveying, research of existing utility locations, and engineering studies.

3. Coordinate with City staff and consultants for CIP projects and other City projects.

4. Provide conceptual design and alternative development plans and schematic plans including 3D modeling and videos of the project, as needed.

5. Conduct informational workshops, monthly status meetings, and presentations to City officials, as needed.

6. Provide information regarding any additional services that may benefit the City.

7. Other related services as requested/directed by the Director of Public Works/Facilities.

2. Project Management & Administration:
a. The Consultant shall perform the following tasks:
i. Assist City staff in scoping, developing, and scheduling capital projects. ii. Prepare RFQs and RFPs, as necessary.
iii. Assist City staff with coordination with other City departments, agencies, utilities, and community as required; monitoring budget and schedule; community outreach as required; and serving as the City's owner representative in all aspects of the project process, if directed by the Director of Public Works/Facilities.

3. Funding Management:
a. The Consultant shall manage the local, state, or federal funding and reporting to the respective funding agencies including Caltrans, Metro, FHWA, FTA, HUD, State Parks, etc.
21 Exhibit 2 113

4. Construction Management and Inspection Services
a. The Consultant shall provide professional engineers/construction managers with significant experience in administering Public Works/CIP projects. The proposed Consultant staff will be well versed in all aspects of construction administration including, but not limited to, project scheduling, project controls, project management, partnering, and claims resolution, in order to ensure project completion on time and within the established budget of the respective project.

Projects in the City vary in size, magnitude, and scope including, but not limited to, street improvements, facility improvements, park improvements, storm drain, pipeline or utility improvements, and traffic signal improvements. The Consultant shall provide experienced personnel, equipment, and facilities to perform the following tasks:
i. Provide and maintain contract administration and full-time project inspection for the duration of each respective project. ii. Coordinate meetings with City representatives, contractors, and other agencies related to the project, including scheduling and chairing of pre -construction meetings and progress meetings; providing assistance in responding to all questions in a timely manner and preparing meeting minutes.
iii. Establish coordination and communication procedures among project participants.
iv. Provide videotape and photographic documentation of project site prior to and during construction.
v. Assist the City's representatives in conducting and coordinating field meetings with contractors and act as the City's liaison for coordination and communication with other agencies, engineers, and architects as needed. vi. Coordinate with design engineers and project managers on design issues encountered during construction.
vii. Coordinate and facilitate coordination with utility companies and the contractor.
viii. Provide public outreach services as required.
ix. Review the project contract documents and perform a constructability review.
x. Review the contractor's submittals in accordance with the requirements of the project specifications and the City's requirements prior to final approval.
22 Exhibit 2 114

A. Review and respond to all project Requests for Information (RFIs) in a timely manner.
xii. Review and facilitate submittals and shop drawings. xiii. Establish and implement procedures for processing and expediting RFIs/Requests for Clarification (RFCs), approval of shop drawing submittals, approval of material and equipment sample submittals, approval of contract schedule adjustments, negotiate and recommend for approval of change orders, substitutions and review and recommend for approval of payment requests; and provide document management including maintain logs for RFIs/RFCs, change orders, submittals, Requests for Quotations, Correction Notices, Stop Work Notices, and other related construction documents.
xiv. Log compliance with environmental documentation and stormwater compliance, including the proper implementation of construction stormwater best management practices (BMPs).
xv. Review, negotiate, process, and monitor contract change orders with the City's approval.
xvi. Review extra work invoices and time and material tickets. xvii. Provide construction inspection and quality control services; including ensuring the scheduling of any applicable specialty inspections that may be required for a project, including for concrete work, electrical/telemetry, structural, and equipment testing; and ensure specialty inspectors have all necessary certifications.
xviii. Ensure the contractor is complying with all applicable permitting requirements, agency requirements, local regulations, and utility requirements.
xix. Verify that contractor used proper materials and equipment, and that all street and facility construction, street restoration, and site improvements are properly completed in accordance with the plans and specifications. xx. Verify protection of existing survey monuments and their restoration, including informing the contractor of these requirements at the pre -construction meeting.
xxi. Ensure the contractor is implementing minimum construction BMPs or BMPs prescribed by the construction SWPPP for sites covered by the State General Construction Activity Stormwater Permit.
xxii. Provide construction material testing, geotechnical testing, and 23 Exhibit 2 115

compaction testing.
xxiii. Review material testing for compliance with the contract documents. xxiv. Monitor the contractor's safety program and performance as required for compliance with Cal/OSHA; and identify and issue notices to the contractor for any safety concerns or violations.
xxv. Participate and assist in conducting final inspection, testing, and release of facilities.
xxvi. Review and approve record drawings at project completion. xxvii. Assist in preparation of daily pay estimates in accordance with the inspection daily report.
xxviii. Assist in preparation of contractor's monthly pay estimates. xxix. Report all unresolved issues and potential claims to the City's representative in writing on daily basis; evaluate all contractor claims and coordinate the resolution of conflicts in the plans and/or specifications, contractor -suggested design changes, and design changes necessitated by unforeseen field conditions.
xxx. Review contractor's CPM schedule and monitor updates on a weekly basis.
xxxi. Provide weekly status updates and comprehensive monthly reports with construction updates; with the monthly reports consisting of the project progress, any compliance issues, and most recent logs for submittals, change orders, RFIs, materials testing, project photos, and any other pertinent information concerning the status of the project. xxxii. Prepare the preliminary and final project punch list and verify completion of punch list items by the contractor for final acceptance by the City. xxxiii. Monitor the maintenance of the project record drawings during construction and the final preparation of "as -built" drawings after project completion.
xxxiv. Assist in project closeout; prepare all documentation needed for project closeout, including assembling all warranties, guarantees, and operation and maintenance manuals.
xxxv. Submit a final construction management report summarizing the project history, including major problems, claims and recommendations, and actions taken for corrective action.
24 Exhibit 2 116

xxxvi. For most typical Public Works/CIP projects, full time inspection will be 8 hours per day and construction management will be 4 hours per day for the duration of the project; subject to modification based on the actual project scope.

5. Labor Compliance:
a. The Consultant shall coordinate with the City's Labor Compliance Consultant for the necessary labor compliance monitoring for each respective Public Works/CIP project. If the City's Labor Compliance Consultant cannot provide the necessary labor compliance services, then the Consultant shall provide these services.

These services shall include, but not be limited to, the following:
i. Provide labor compliance services for construction project activities with reporting as required by federal, state, or county regulations as needed. ii. Review certified payroll and conduct on -site interviews as required. iii. Prepare final reporting documents in a format in accordance with granting agency requirements.
iv. Assist the City in preparing for any project audits. v. Attend audits in support of staff and ensure that the proper documents are available.

Federally funded project caveat. The City intends to construct during the duration of the agreement multiple transportation projects that are state and federally funded. In addition to the services described above, these projects may require additional or specific services as described below in compliance with the Caltrans Local Assistance Procedure Manual (LAPM). The selected Consultant shall perform site investigations, cost estimating, planning, land surveying, preliminary engineering, civil engineering design, construction support and other services as deemed necessary by the City for which the Consultant is qualified related to federal and state funded projects, and charge these services in accordance with the categories above. The Consultant may provide services to the City including, but not limited to, the following:
• Project Management — The Director of Public Works/Facilities will serve as the contract manager and direct liaison between the Consultant and Caltrans District No. 7 Division of Local Assistance. The Consultant shall be responsible for project management activities throughout the life of the contract and the scope of activities includes, but is not limited to, coordinating and being responsible for scheduling meetings, managing the project schedule, preparing and distributing minutes, field reviews, tracking action items for the City and the Consultant's subcontractors, and preparing all submissions for the City to submit to Caltrans 25 Exhibit 2 117

Local Assistance.
• Preliminary Engineering Studies — Develop general project locations and design concepts and related activities needed to establish the parameters for final design such as Geometrics, Hydraulics, Geotechnical, Bridge, Landscape Architecture, Traffic Operations, Electrical, ITS Elements, etc.
• Surveys and Mapping — The Consultant shall be responsible for data collection, mapping and surveying necessary for preliminary engineering, design, cost estimates, right-of-way impacts, and the level of environmental clearance. The scope of comprehensive base mapping and surveying includes, but is not limited to, Control Surveys, Aerial Photogrammetry, Design Level Topographic Surveys, Right -of -Way mapping and property boundary mapping required for property acquisitions, and a Record of Survey.
• Environmental Studies and Documentation — Complete the environmental review; including preparation of Caltrans Preliminary Environmental Study and all other technical studies and documents required to comply with CEQA and NEPA and to obtain environmental clearance from Caltrans.
• Utility Coordination —Submit improvement plans to utility companies in accordance with their requirements. Coordinate utility relocations, including relocation of the utility poles, as needed. Prepare all documentation required to obtain utility clearance from Caltrans.
• Right of Way Phase & Determination —The Consultant shall prepare the Request for Authorization to advance a project to the Right of Way Phase using procedures outlined in the Caltrans Local Assistance Procedures Manual. When authorized, the Consultant shall review right-of-way records and establish additional right-of-way along the entire alignment, if necessary. The Consultant shall prepare all documents required to obtain right-of-way clearance from Caltrans. The Consultant shall also support City staff in negotiations with property owners for property acquisition and in coordinating improvements affecting improvements on private property and necessitating Temporary Construction Easements. • Design — Design the improvements and prepare the plans, specifications, and estimates in accordance with Caltrans Standards and AASHTO Geometric Design guidelines to achieve project objectives. The Consultant shall examine and present project alternatives, as necessary, which complete project goals within construction budget. PS&E shall be submitted to the City at 30%, 60%, 90%, and final contract documents.
26 Exhibit 2 118

• Construction Phase Authorization — The Consultant shall prepare the Request for Authorization to advance the project to Construction using procedures outlined in the Caltrans Local Assistance Procedures Manual.
• Bid Process — Provide an electronic copy of the final approved plans and specifications, a mylar copy of the final approved plans, and a hard copy of the final approved specifications. The electronic copy of the plans shall be provided as both AutoCAD files and PDF files, and the electronic copy of the specifications shall be provided in both Microsoft Word format and PDF format. The Consultant will be responsible for making copies of contract documents and will distribute them to plan rooms and contractors. The Consultant shall respond to questions that arise during the bid phase and prepare addendums which will be distributed by the City, as necessary.
• Construction Support — The Consultant shall provide support during construction to the City. This shall include, but not be limited to, review of submittals and shop drawings, responding to Requests for Information, modifications to the design in response to changed conditions encountered during construction, and assistance in the review and analysis of proposed Change Order proposals. Attendance at weekly progress meetings may be required.
• Grant Administration — The Consultant shall prepare Requests for Authorization (RFA) to Caltrans Local Assistance for the various phases of work including, but not limited to, the following: 1) Preliminary Engineering (PE) & DBE Goal Setting; 2) Right of Way (R/W); 3) Utility Relocation (RW/UTIL); and 4) Construction (CON).

Consultant shall prepare the Award Package and Final Report of Expenditures to Caltrans and shall assist the City in the preparation of federal and state invoices and requests for reimbursement. These services shall be in accordance with Caltrans Standards, FHWA Standards, and the City's Standards.

G. As -Needed Other/Additional Public Works Engineering Services At times, the City may require other/additional Public Works engineering and administrative services. The firm will provide as -needed other/additional Public Works engineering services through qualified individuals at the request of the Director of Public Works/Facilities (or his/her designee). The firm's other/additional Public Works engineering staff must each have at least five (5) years of experience of providing miscellaneous engineering -related services to municipalities in California and have performed these services for California municipalities within the past twelve (12) months.

The firm's tasks may include, but not be limited to, the following:

1. Project administration, grant administration, and contract administration for projects or programs not related to Category F (Public Works/CIP Projects). 27 Exhibit 2 119

2. Miscellaneous engineering services as needs arise.

H. NPDES Stormwater Compliance Consultant Services
The City is subject to various stormwater requirements contained in the Municipal Separate Storm Sewer System (MS4) National Pollutant Discharge Elimination System (NPDES) Permit and State General Construction and General Industrial Activity Permits (CGP and IGP) issued by the Los Angeles Regional Quality Control Board (RWQCB) and the State Water Resources Control Board (SWRCB), respectively. The City is also subject to the conditions contained in the Los Angeles River Upper Reach 2 Watershed Management Group (LARUR2-WMG) Watershed Management Program (WMP) and Coordinated Integrated Monitoring Programs (CIMP); and the requirements and conditions contained in the Safe, Clean Water Program (Measure W), of which the City is a recipient of Municipal and Regional Measure W funds. The Consultant will provide the City with NPDES Stormwater Compliance Consultant Services with Consultant staff possessing any required stormwater certifications to achieve and maintain compliance with the requirements and/or conditions contained in the MS4 NPDES Permit, CGP, IGP, LARUR2-WMG WMP and CIMP, and the Measure W ordinance. The firm's tasks will include, but not be limited to, the following:

Stormwater Management Program Minimum Control Measures Compliance.

The Consultant will ensure compliance with the requirements for Progressive Enforcement and Interagency Coordination, Public Information and Participation Program, Industrial/Commercial Facilities Program, Planning and Land Development Program, Construction Program, Public Agency Activities Program, Illicit Discharge Detection and Elimination Program contained in the most recent MS4 NPDES Permit (currently Order R4-2021-0105, NPDES No. CAS004004) and the most recent LARUR2-WMG WMP. These tasks will include, but not be limited to, the following:
a. Industrial/Commercial Facilities Program
The Consultant shall perform the following:

Track Critical Industrial/Commercial Sources
Review City databases to determine inventory of industrial/commercial facilities subject to a stormwater inspection
Track facilities (industrial and commercial sources) using a GIS-based inventory using an electronic database
Track inspection reports and enforcement actions with an electronic database Educate Industrial/Commercial Sources
Notify facility operators of applicable Best Management Practice (BMP) requirements
Develop and implement a Business Assistance Program
Develop educational materials to be distributed to facilities Inspect Critical Industrial/Commercial Sources
28 Exhibit 2 120

Inspect State NPDES Permitted industrial facilities for proper BMP implementation
Inspect commercial/light industrial facilities for proper BMP implementation Inspect eating establishments and nurseries for proper BMP implementation Verify the implementation of the Commercial and Industrial Source Control BMPs identified on Table 6 of the MS4 NPDES Permit
Ensure Compliance (Implement Progressive Enforcement)
Follow-up at non -compliant facilities within 4 weeks
Prepare formal violation notices following City's municipal code Manage program and implement quality assurance/quality control (QA/QC) procedures
Train City staff
The Consultant will keep track and inform the City of when the required Industrial/Commercial Facilities Control Program inspections will need to be conducted in order to remain in compliance with the MS4 NPDES Permit and LARUR2-WMG WMP. The Consultant will perform the industrial/commercial facility stormwater inspections with the following minimum program elements: (1) tracking, (2) education, (3) inspection, and (4) ensuring compliance with the municipal ordinance at industrial and commercial facilities that are critical sources of pollutants in stormwater.

The City will issue the Consultant a separate Request for Service or Task Order for each round of industrial/commercial facility stormwater inspections.

The Consultant's industrial/commercial facility stormwater inspections will include the following components:
i. Information Gathering
The Consultant will gather the following information during the inspection of each industrial or commercial facility to assist the City in updating its watershed -based inventory as required by the RWQCB:
(1) Name of facility;
(2) Name of owner/operator and contact information;
(3) Address of facility (physical and mailing);
(4) The latitude/longitude coordinates;
(5) Standard Industrial Classification (SIC) code;
(6) North American Industry Classification System (NAICS) code (optional); 29 Exhibit 2 121

(7) A narrative description of the activities performed and/or principal products produced;
(8) Status of exposure of materials to storm water;
(9) Name of receiving water;
(10) Identification of facilities that have active coverage under the SWRCB's General NPDES Permit for the Discharge of Storm Water Associated with Industrial Activities (Industrial General Permit) or other individual or general NPDES permits. For facilities with active coverage under the Industrial General Permit, the type of coverage (i.e., Notice of Intent or No Exposure Certification) and the Waste Discharge Identification (WDID) number shall be included;
(11) Identification of facilities that have filed a Notice of Non -Applicability (NONA) or any applicable waiver issued by the LARWQCB or the SWRCB pertaining to stormwater discharges;
(12) Date and description of outreach; and
(13) Date(s) of inspection(s).
ii. Inspections
The Consultant will list the number of industrial/commercial facilities subject to a stormwater inspection based on the City's most recent business license inventory or other readily available database of industrial/commercial facilities subject to a stormwater inspection including, but not limited to, restaurants, auto repair/services facilities, retail gas stations, and industrial facilities. The Consultant will ensure industrial/commercial facility stormwater inspections are conducted by qualified and certified stormwater inspectors as required by the MS4 NPDES Permit. The Consultant shall update the inventory of critical sources at least once every two years on behalf of the City. The update shall be accomplished through collection of new information obtained through field activities or through other readily available inter- and intra-agency informational databases (e.g., business licenses, pretreatment permits, sanitary sewer connection permits, and similar information).
iii. Education
The Consultant will notify the owner/operator of each of its inventoried commercial and industrial sites of the BMP requirements applicable to the site/source. The Consultant's inspector will provide the owner with the required BMP information on a City approved handout. More specifically, the Consultant's inspector will distribute stormwater pollution prevention educational materials to operators of auto facilities, restaurants, industrial facilities, and mobile businesses. This will also meet the requirement of the City to implement a Business Assistance 30 Exhibit 2 122

Program to provide technical information to businesses to facilitate their efforts to reduce the discharge of pollutants in stormwater.
iv. Schedule
The Consultant will provide a schedule for the completion of the required industrial/commercial facility stormwater inspections, including any required reinspection due to violations. The Consultant will provide the City with inspection records and provide the information to the City in an electronic database. For facilities with violations, a reinspection will be completed within 4 weeks of the initial inspection. A notice of compliance/violation will be forwarded to the owner within one week of the inspection notifying them of the violation and informing them of the reinspection.
v. Scope of Industrial/Commercial Facilities Stormwater Inspections Commercial Facilities: The Consultant will inspect commercial facilities subject to a stormwater inspection every two years. The Consultant will inspect these facilities to confirm that stormwater and non-stormwater BMPs are being effectively implemented in compliance with municipal ordinances. At each facility, inspectors shall verify that the operator is implementing effective source control BMPs for the pollutants generated by the commercial activity.

Likewise, for those BMPs that are not adequately protective of water quality, the Consultant, as authorized by the City, may require a commercial facility to install additional site -specific controls. Each inspection shall be documented by an inspection report that includes a summary of the inspection, conclusion, and photos.

Industrial Facilities: The Consultant will inspect industrial facilities subject to a stormwater inspection every two years for facilities that have exposure to stormwater and every five years for facilities that do not have exposure to stormwater. The Consultant will inspect these facilities to confirm that:
(1) The facility is either enrolled in the Industrial General Permit (i.e., has an active WDID number) or has submitted a NONA application to the Los Angeles Water Board.
(2) A Storm Water Pollution Prevention Plan (SWPPP) is developed and available at the facility.
(3) BMPs are being effectively implemented at the facility for all pollutants of concern.

The Consultant shall document each inspection with an inspection report that includes a summary of the inspection, conclusion, and photos. The Consultant will also inform the RWQCB and/or SWRCB, within 2 weeks after conducting the inspections, of any industrial facilities subject to coverage under the IGP that do not have evidence of coverage through a current WDID number or a 31 Exhibit 2 123

No Exposure Certification.
b. Planning and Land Development Program
The Consultant shall perform the following:

Program Implementation
Ensure the City has prepared and adopted a Low Impact Development (LID) ordinance
Review or ensure LID plans/Standard Urban Stormwater Mitigation Plans SUSMPs are reviewed
Prepare SUSMP/Post-construction BMP Maintenance Agreements/Covenants and ensure they are executed by the project developer/property owner, and recorded by the L.A. County Registrar -Recorder, if applicable Track projects and BMPs in an electronic database
Track all inspection reports and enforcement actions
Conduct BMP verification inspections
Notify existing SUSMP sites of maintenance requirements Conduct BMP maintenance inspections
Conduct follow-up activities at non -compliant projects Manage Program, Implement QA/QC Procedures
Train City staff
c. Development Construction Program
The Consultant shall perform the following:

For sites less than one acre: review erosion control plans and track, inspect, and conduct follow-up site visits
Inventory construction sites >1 acre
Update the inventory of construction sites >1 acre month) Track site inventory, inspections, and enforcement actions using an electronic database
Review and approve Construction SWPPPs prior to the City's issuance of land disturbance permits
Inspect >1 acre construction sites monthly for proper BMP implementation Ensure compliance (implement progressive enforcement
Follow-up at non -compliant facilities within 4 weeks
Prepare formal violation notices following Cit 's municipal code Train City staff
Train plan reviewers and permitting staff in BMP standards and SWPPP requirements
Train construction site inspection staff in BMP standards and SWPPP requirements Manage Program, Implement QA/QC Procedures
The Consultant will coordinate the annual mandatory training sessions with pertinent City staff. Training topics will include the key components of the QSP and QSD 32 Exhibit 2 124

Programs. The Consultant will update and revise training documentation as necessary and will make the materials available for distribution to pertinent City staff. Turn -around time for SWPPP review will be two weeks. Inspections at State -permitted construction sites will be conducted once per month. Inspections at sites disturbing less than one acre but with enhanced control measures that exceed the minimum requirements will also be inspected once per month. Enforcement actions, when necessary, will be issued within one week. Follow-ups will be conducted within the timeframe provided in the enforcement action.
d. Public Agency Activities Program
The Consultant shall perform the following:

Public Construction Activities (addressed by Development Construction Program) Inventory Public Facilities for 24 categories of public facilities, including pollutants sources
Inventory Existing Development Retrofit Opportunities
Identify and rank candidate retrofit areas using watershed model/screening tools Public Agency Facility and Activity Management
Develop language to require contractors to implement BMPs Landscape, Park and Recreational Facilities Management
Develop Integrated Pest Management Policy
Storm Drain Operation and Maintenance
Prioritize catch basins
Assist with installation of trash capture devices in high priority areas Municipal Employee and contractor Training
Train staff in targeted positions of requirements of Public Agency Activities Program Manage Program, Implement QA/QC Procedures
e. Illicit Discharge Detection and Elimination Program
The Consultant shall perform the following:

Ensure illicit discharges are investigated and eliminated Develop written procedures for illicit discharge investigation and elimination Investigate illicit discharge complaints and prepare investigation reports Conduct follow-up investigation to verify elimination of detected illicit discharges Public reporting of non-stormwater discharges ands ills Develop written procedures for tracking complaints
Document complaints and investigations
Develop Spill Response Plan
Provide illicit connection and illicit discharge education and training Train City staff on illicit discharge identification, elimination, clean-up, reporting, and documentation
Manage Program, Implement QA/QC Procedures
f. Public Information and Participation Program
33 Exhibit 2 125

The Consultant shall perform the following:

Public Participation: Participate in a City event to promote public involvement in pollution prevention as needed
Develop Residential Outreach Program
Prepare article for City media outlet
Develop educational materials to address vehicle, house, yard, animal, and construction wastes
Distribute materials at points of purchase (auto parts, home improvement, pet/feed stores, etc.)
Ensure City's Public Works environmental/stormwater webpage contains required educational items
Ensure educational materials are provided to school children (if not addressed by L.A. County program)
Manage Program, Implement QA/QC
g. Watershed Management/TMDL Programs
The Consultant shall perform the following:

Provide as -needed assistance with program development for any applicable Total Maximum Daily Loads (TMDLs) including, but not limited to, Bacteria, Metals, and Trash TMDLs:

Watershed Control Measures: Provide as -needed assistance with implementation efforts, such as:

Public LID retrofit projects and green streets projects Nonstructural and institutional watershed control measures Non-stormwater discharge source identification
Trash Amendments compliance
Ensure compliance with monitoring efforts undertaken by LARUR2-WMG WMP watershed consultants
Adaptive Management: Provide as -needed assistance with program developments
Representation: Provided as -needed CITY representation at LARUR2-WMG WMP meetings, Lower Los Angeles River WASC meetings, and any other stormwater- related meetings as requested by the Director of Public Works/Facilities h. Monitoring and Reporting Program
The Consultant shall perform the following:

Reporting: Prepare the MS4 NPDES Annual Report, including MS4-related TMDL Reporting
Reporting: Prepare the Semi -Annual MS4 NPDES Report, including MS4-related TMDL Reporting
Ensure compliance with monitoring efforts undertaken by LARUR2-WMG WMP 34 Exhibit 2 126

and CIMP watershed consultants; if LARUR2-WMG no longer provides this monitoring, then Consultant shall coordinate any necessary monitoring Preparation of the Annual Report will include a first draft for review by the Director of Public Works/Facilities two months prior to the annual submittal deadline, and a final draft for final review by the Director of Public Works/Facilities one month prior to the annual submittal deadline.

2. General Stormwater Compliance Consultant Assistance.

The Consultant shall perform the following:

Represent City at relevant NPDES-related or Measure W-related meetings and update City staff
Provide program updates to City staff and elected officials Provide assistance with the MS4 Permit renewal process, representing City interests in negotiations and communications with the RWCB, SWRCB, or U.S. EPA.

Provide assistance with other stormwater-related tasks as requested by the Director of Public Works/Facilities
Assist City staff with overall program management for MS4 NPDES Permit compliance (including preparation of documents for reports to the County and RWQCB
Provide inventory of City facilities that area potential source of stormwater pollution Provide inventory of existing development to identify potential locations with retrofitting opportunities
Develop BMPs for mitigation of stormwater pollution at City facilities Evaluate City's landscape management program to ensure protocols are in place to properly manage application and storage of pesticides and fertilizers to prevent stormwater pollution
Assist City staff with public education/outreach activities, as requested by City.

For development projects, ensure the City is issuing technical approval of SWPPPs and LID/SUSMP Plans
Inspect construction sites to ensure correct installation and operation of BMPs Post construction, conduct annual maintenance inspections to ensure correct operation of BMPs and LID Plans.

Provide Measure W program administration including, but not limited to, preparing draft Measure W Annual Plans, draft Measure W Annual Reports, and Draft Measure W Quarterly Reports, including providing all required technical or engineering information by a licensed engineer in the State of California, for review by the Director of Public Works/Facilities at least one month prior to the submittal deadline to L.A. County Flood Control District (LACFCD); and submit the finalized tans or reports to LACFCD if directed by the Director of Public Works/Facilities The Scope of Work may be modified through negotiation and/or by written addendum after the Agreement is approved.
35 Exhibit 2 127

METHOD OF COMPENSATION
Work Item
Compensation Method
City Engineer Retainer
Lump sum per month
Traffic Engineer Retainer
Lump sum per month
Public Works Permit Management and
Hourly rates
Inspection
As -Needed Water Engineering
Hourly rates
As -Needed Development Engineering
Hourly rates
As -Needed Public Works/CIP Project
Design fees based on percentage of the
Design, Project Management &
estimated cost of construction. Construction
Administration, Funding Management,
fees based on percentage of average of
Construction Management, Construction
three (3) lowest bids. If only two (2) bids are
Inspection, And Labor Compliance Services
received, the average of the two (2) bids will
be used. If only one (1) bid is received, the
actual bid amount will be used.

As -Needed Other/Additional Public Works
Hourly rates, not -to -exceed a negotiated
Services
scope and lump sum.
-Engineering
NPDES Stormwater Compliance Consultant
Hourly rates
Services

PROPOSAL FORMAT AND CONTENT REQUIREMENTS
The following instructions describe the form in which proposals must be submitted.

Responses to the following items will be used for proposal evaluation. Proposals that do not contain responses to each of the requirement items will be considered incomplete and may be rejected.

Proposal documents should provide a straightforward, concise description of the Consultant's capabilities to satisfy the requirements of this RFP. Emphasis should be on completeness, clarity of content, and conveyance of the information requested by the City. The requirements stated do not preclude a Consultant from furnishing additional reports, functions, and costs as deemed appropriate.

The proposal must contain the following elements:
36 Exhibit 2 128

1. Transmittal Letter:
a. A letter of transmittal signed by an individual authorized to bind the proposer stating the proposer has read and will comply with all terms and conditions of the RFP. The transmittal letter will contain, at a minimum: a) company name and address; and b) an executive summary briefly describing the proposer's ability to perform the work requested, a history of the Consultant's background and experience providing services, and a description of the firm's understanding of the City's needs. b. Conflict of Interest Statement: The Consultant shall disclose any financial, business, or other relationship with the City that may have an impact upon the outcome of this Agreement. Particular attention should be paid to compliance with Government Code section 1090.

2. Methodology
a. Include description of a) the approach and methodology to be taken in addressing each component in the scope of work, b) a listing of the specific tasks, milestones and deliverables required to properly perform the requested services, and c) a workplan showing proposed hours for each retainer service, availability of team members, quality assurance & supervision.
b. The City will expect the selected Consultant to adhere to the established methodology and workplan.

3. Management and Staffing:

Describe the management and staffing configuration to be utilized to complete each component of the scope of work. Describe the qualifications of staff to be assigned to the City, their title, and types and amount of equivalent experience. Resumes of all proposed personnel must be included. The proposal must indicate who will have primary responsibility for the requested services. The proposal must also identify any proposed subcontractors or subconsultants that are integral to the proposed team.

4. Minimum Qualifications, Prior Related Experience, and References a. Firms or individuals must demonstrate competence and capability to satisfactorily perform the scope of work. Firms must have at least ten (10) years of experience providing municipal engineering services in California. Proposals that do not meet the minimum qualifications will be determined nonresponsive and ineligible for award. The proposer must provide evidence to show that the firm and members of the proposer's project team possess the specific minimum experience, 37 Exhibit 2 129

qualifications, competence, resources, and business integrity as specified in the scope of work that are necessary to carry out the work under the contract as expected. Examples of evidence include, but are not limited to resumes, letters of reference, and project/service summaries that highlight the team's specific experience.
b. A list of at least five (5) professional references, three (3) of which shall be from a municipal or public agency. This client reference list must be included as an appendix to the proposal and must include the following information for each reference listed: a) complete description of the work/services provided, b) the time period for the work/services provided, c) the name and contact information of the client, including telephone number and/or address, and d) the key managers and professionals assigned to the work/services. The information concerning the work/services provided for each respective client must be no more than five (5) years old.

5. Cost and Pricing:
a. Proposals must include the Proposal Price Sheet attached as Attachment "B." b. For as -needed non -retainer services, proposals must include staff hourly rates, plus any other proposed costs such as mark-ups, overhead, travel, etc. An hourly fee/rate schedule must be submitted with the proposal. If the scope of work is substantially modified, the extra cost or credit must be negotiated based on the submitted hourly fees/rates.

6. Additions or Exceptions:
a. A single and separate section with the heading "ADDITIONS OR EXCEPTIONS TO THE CITY'S REQUEST FOR PROPOSAL" containing a complete and detailed description of all the Consultant's exceptions to the provisions and conditions of the attached City standard professional services agreement attached as Attachment "C."

7. Pending Litigation:

Include an explanation and status, if in the last five years, the firm or an office or principal of the firm has been involved in any substantiated complaints, litigation, legal proceedings, or investigations by a regulatory authority.
38 Exhibit 2 130

8. Insurance:

Evidence of commercial liability, professional liability, and workers compensation insurance coverages must be included. Insurance requirements are listed on the sample agreement attached as Attachment "C."

EVALUATION CRITERIA
The award of an agreement will be made to the most qualified Consultant(s) whose proposal complies with the prescribed requirements. The City reserves the right to reject any or all proposals and to waive any technical errors, irregularities, or discrepancies, if to do so is deemed to serve the best interests of the City. In no event will an award be made until all necessary investigations are made as to the responsibility and qualifications of the Consultant to whom it is proposed to make such an award.

Proposals will be reviewed and evaluated by City staff, including the Director of Public Works/Facilities, and will be ranked based on the following criteria:

1. Comprehension of the Request for Proposals
(Max Score. 15 Points)
This relates to the proposer's basic understanding of the City's requested services and proposer's ability to articulate a concise description of the role of the requested services.

2. Qualifications of Proposer
(Max Score. 65 Points)
• Experience of the firm
• Staffing and resources
• Qualifications and experience of proposed personnel
- City Engineer
- Traffic Engineer
- Other assigned personnel
• Ability to provide other Public Works -related services such as project administration, grant administration, and contract administration.
• Familiarity with federal, State and regional/local agency requirements, including funding and project entitlement requirements from agencies such as FHWA, FTA, Caltrans, Metro, etc.

3. References
(Max Score. 20 Points)
This relates to the reputation and quality of past work performed by the proposer based on municipal and other professional references.

If further clarifications or negotiations are required, on -site or virtual interviews may be conducted. Participation in these interviews will be at the expense of the proposers. The 39 Exhibit 2 131

interview panel will be made up of staff members or representatives from the City.

Recommendations will be provided to the City Council for final selection and award.

Proposals failing to provide sufficient information and assurances of performance to adequately assess each category of the required services and/or failing to comply with the requirements and conditions of this RFP may not be given further consideration.

Factors such as, but not limited to, any of the following may be considered just cause to disqualify a response to the RFP without further consideration:
• Evidence of collusion, directly or indirectly, among Consultants with regard to the amount, terms, or conditions of this proposal;
• Any attempt to improperly influence any member of the selection staff or City Council members;
• Existence of any lawsuit, unresolved contractual claim or dispute between Consultant and the City;
• Evidence of incorrect information submitted as part of the RFP; • Evidence of Consultant's inability to successfully complete the responsibilities and obligations of the proposed scope of work; and
• Consultant's default under any agreement, which results in termination of the Agreement.

Each proposal will be considered along with those of other responding Consultants, with respect to ability to perform effectively and efficiently those scope of work outlined above.

The successful Consultant shall not discriminate, in any way, against any person based on race, sex, color, age, religion, sexual orientation, actual or perceived gender identity, disability, ethnicity, or national origin, or any other protected classification in connection with or related to the performance of the Agreement.

Close coordination with the City is required to assure that all requirements will be met. The City reserves the right to withdraw this RFP at any time without any prior notice. Further, the City makes no representations that any Agreement will be awarded to any Consultant responding to this RFP. The City expressly reserves the right to postpone reviewing the proposals for its own convenience and to reject any or all proposals responding to this RFP without indicating any reasons for such rejection(s).
40 Exhibit 2 132

ATTACHMENT "A"

PROPOSAL PRICE SHEET
41 Exhibit 2 133

PROPOSAL PRICE SHEET
A. City Retainer:

City Engineer @ $ per month
B. As -needed Traffic Enaineer:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

C. Public Works Right of Way Permit Management and Inspection:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

D. As -Needed Water Engineer:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

E. As -Needed Development Engineer:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

F. As -Needed Public Works/Capital Improvement Program Projects:

These services will be billed as a percentage of a project's construction cost. Specify the percentages for the services listed below for construction costs less than $499,999, construction cost between $500,000 - $999,999, construction cost between $1,000,000 - $4,999,999, and construction cost over $5,000,000:

1. Design Services _%

2. Project Management and Administration _%

3. Funding Management _%

4. Construction Management _%

5. Construction Inspection _%
For Labor Compliance, attach the hourly rates for the various classifications that would be billed to the City under this category.

G. As -Needed Other Public Works Engineering Services:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

H. NPDES Stormwater Compliance Consultant Services
Attach the hourly rates for the various classifications that would be billed to the City under this category.
42 Exhibit 2 134

ATTACHMENT "B"

ACKNOWLEDGEMENT OF CITY'S STANDARD FORM OF AGREEMENT
43 Exhibit 2 135

ACKNOWLEDGEMENT OF CITY'S STANDARD FORM OF AGREEMENT
I, the undersigned, certify that I, [insert name] am the [insert title] of [insert firm
name], the party making the proposal for award of an agreement for ENGINEERING SERVICES ("Proposer") and, on behalf of the Proposer, hereby:

Accept City's Standard Form of Agreement — check one box. u As is, without qualifications or modifications.
u As modified by attachment. [Proposer to provide]
I certify that I am authorized to sign this Consent Form on behalf of the Proposer.

Executed this day of
Signature of Officer
2023 at
Title of Officer
, California.

Printed/Typed Name of Officer
44 Exhibit 2 136

ATTACHMENT "C"

SAMPLE PROFESSIONAL SERVICES AGREEMENT
45 Exhibit 2 137

EXHIBIT "B"

CONSULTANT PROPOSAL
22 Exhibit 2 138

B4
WON
City of Bell Gardens, CA
Municipal Engineering Services
Submitted by:
11011007=111111111
Sid Mousavi, MSCE, PE, Senior Principal Bernardo I nig uez, Director of Public Works / Facilities Infrastructure Engineers, a Bowman company City of Bell Gardens 3060 Saturn Street, Suite 250 8327 Garfield Avenue
Brea, CA 92821 Bell Gardens, CA 90201
714.94UIOO 1 [email protected] I bowman.corn

INFRASTRUCTURE
' e
November 9,2023
Exhibit 2 139

Table of Contents
TAB #

SECTION
PAGE #
Transmittal Letter
2 Methodology
4 Management and Staffing26
Qualifications, Related Experiencer e s
93 Cost and Pricing
95 Additions or Exceptions
700
Pending Litigation
707
Insurance
702
Appendix
703
Exhibit 2 140

Transmittal Letter

kw INFRASTRUCTURE

ENGINEERS
% a Bowman company
November 9, 2023
Bernardo Iniguez
Director of Public Works / Facilities
City of Bell Gardens
8327 Garfield Avenue
Bell Gardens, CA 90201
RE: Municipal Engineering Services
It has been a privilege for Infrastructure Engineers to provide engineering services for the City of Bell Gardens.

We are thankful for the opportunity to present our qualifications to continue serving the city and the community of Bell Gardens. The city has accomplished much in the past two decades, including numerous street improvement projects, Safe Route to School Programs, parkfacilities, traffic signal projects and the Bicycle Casino renovation and hotel improvements project. On behalf of the city, Infrastructure Engineers (IE), a Bowman company has obtained several streets and transportation grants, park and recreation facilities funds, active transportation program grants, water improvements grants and various highway safety grants to further enhance the safety and quality of life for the residents and businesses of Bell Gardens.

IE is currently engaged in several important projects for the city and we would be honored to continue our partnership with your staff and the community in the coming years. Some of these projects include:

1. Various Alleys Improvements Project - CIP 3930. 7. ATP Cycle 5 Citywide Complete Street Phase I.

2. Florence Avenue & Eastern Avenue Improvements. 8. Water Resources Development Act of 2022.

3. Garfield Avenue & Eastern Avenue Improvements. 9. GWMA Recycled Water Project.

4. Florence Avenue & Jaboneria / Ira Improvements. 10. Well No.1, State Planning Grant, Amendment No. 2.

5. Eastern Avenue Improvements. 11. Well No. 3C / 3F Abandonment.

6. Clara Avenue Corridor Improvements.

We have expanded our staffing and resources to address the needs of the City of Bell Gardens for current and future projects. We have added highly experienced city engineers, city planners, architects, inspectors, technicians, construction managers as well as support staff to meet and exceed the demand for additional services. We have established a reputation for meeting the expectations of the city by employing experienced staff members who not only understand engineering, but also have a solid foundation in the inner workings of the city and the Public Works responsibilities. More than 90% of our staff, as part of their professional development, have worked for city governments as employees. As a result, our company is known for providing responsive service and quality recommendations and solutions to a wide range of design and construction projects, in addition to fulfilling the city's staff augmentation needs. We believe that successful projects are the result of a well -managed and motivated team, committed to being accountable and sharing ownership in the product or service that they provide.
3060 Saturn Street, Suite 250, Brea, California 92821
714.940.0100
infrastructure-engineers.com I bowman.com
Exhibit 2 142

Our employees assigned to the City of Bell Gardens have worked together and with the city staff for several years and have developed cohesive relationships that will ultimately improve efficiency and make the work environment apleasant place toconduct business. VVeare eager Noaggressively respond tothe wide-ranging services that the city requires. VVebelieve that our team has the qualifications and the experience that is necessary tosupport the city with all of their municipal engineering services based on the following reasons:
^ Proven and Experienced Team The proposed |Eteam members exhibit the interpersonal skills, level of integrity, thoroughness, proactive approach and technical competence required by the city. Our staff has the proven ability tomulti-task and towork with the minimal supervision that is required to meet tNecity's current staffing and project needs. The team has diverse experience in a variety of roadway improvements, water systems, sewer rehabilitations, storm drain improvements, site work, grading, traffic improvements and facility design and construction projects.
^ Proven Track Record IE staff exclusively service state and local agencies and have an extensive history of successfully providing a wide range of services. Our experience minimizes training time and results in cost savings for the city. Additionally, our team has extensive experience providing professional services for municipal agencies and we encourage the city to contact our references and confirm our successful track record.
^ UmderstamdimgCity's Financial Needs We understand the city isoften faced with budget constraints. |Ehas a history of successfully delivering projects with very limited budgets. We are committed to working with the city and the rates provided herein are the generally accepted average within the industry. ^ Cost Effective Approach Due toour experience with many complex public improvement and [|Pprojects, webring fresh, newideastoso|vemanyofthechaUemgesfacingnewdeve|opmen1sinthemos efficient and cost-effective way possible. Each project, by its nature, is different from all others and it has its own unique challenges and solutions.

VVebelieve that the qualifications of our staff, in combination with our competitive rates and our dedicated interest in the City of Bell Gardens, makes IE exceptionally qualified to provide the city with professional engineering services. Byselecting |Ethe city will benefit from the experience offormer City Engineers and adedicated team with varied and extensive municipal experience and the ability tosupport all projects the city may undertake. VVelook forward tocontinuing our working relationship with the city and providing our professional services tohelp you meet the city'sgoals and objectives.

VVeare excited and grateful for the opportunity to continue providing Municipal Engineering Services to the City of Bell Gardens. We thank you for giving IE the opportunity to be of service to the city and for the chance toonce again partner with the city to be part of this great city's legacy and to make a difference in your community. IE has no financial, business, or other relationship with the city that may have an impact upon the outcome of this Agreement, imparticular compliance with Government Code section lOgO.

As an officer of the firm, I am authorized to bind IE to all commitments made in this proposal and execute agreements. We have read and will comply with all terms and conditions of the RFP. If you have any questions regarding this proposal, please do not hesitate to contact me at 714.940.0100 or byemnaiUatsmnomsavi@imfemgr. corr).

Sincerely,
/wrm^srnuorums

ENGINEERS
aBowman company
Sid K8omsavkK8SCE.PE infrastructure-engineers.comI bowman.com Exhibit Senior Principal 143

Methodology

Methodology

UNDERSTANDING THE CITY'S NEEDS
The City of Bell Gardens needs a full -service engineering firm with the capabilities and resources to manage all the engineering and construction support needs of the city. The city requires the services of a City Engineer, Traffic Engineer, Water Engineer, Public Works Permit and Inspection staff, Planning, and Community Development Engineer. Other needed services include assistance with the city's National Pollutant Discharge Elimination System (NPDES) compliance and coordination as well as other engineering and administrative services, such as project administration, grant administration and contract administration.

The City Engineer will be the lead staff and will bring other expertise to the programs and projects at pre -scheduled intervals or as needed by the city. Responsibilities also include, but are not limited to, oversight of traffic and transportation engineering support, water engineering, NPDES programming and management, plan review and plan check services, construction management and inspection, civil design, structural improvements, mechanical, electrical design, land surveying, mapping, geotechnical engineering, investigations and reporting, engineering assessments, grant writing and funding compliance. We understand the city does not necessarily need all of these services all at once, or on a daily basis, but, they need to be available promptly, when needed.

The city requires a City Engineer committed to the city at least four (4) hours per week to respond to inquiries from city departments, outside agencies, contractors, utility companies, and the general public. The City Engineer may also be required to attend City Council meetings and Department Heads staff meeting every month. When requested, the City Engineer or the traffic engineer must attend Traffic Commission meetings, Planning Commission meetings or any other public meetings that may require engineering supported expertise. At the same time, the City Engineer and engineering team must be available during city hours to communicate and respond to phone calls and ernails on engineering matters related in the City of Bell Gardens.

The city needs an engineering company with a wide range of resources and expertise to handle the varied and complex capital improvement projects and programs. The engineering team must be familiar with Green Streets designs and Complete Streets concepts.The engineering design team must complete projects and prepare plans and specifications in accordance with general engineering practices and in compliance with funding source requirements. The engineering design and construction management team will also oversee bidding processes and contract awards t Understanding the city's budgeting process, procedures and practices is vital. Experience in managing various funding sources for the city's projects is essential, and demonstrated capability and resources to apply for grants as well as comply with funding sourcesrequirernents is necessary. Understanding of the NPDES permitting requirements, compliance and promotion of the concept and requirements of the clean water act is also a high priority for the city.

Ultimately, the city needs a firm that can engage and manage the members of its organization as extensions of the city staff.

The City Engineer and engineering team members must gain the respect and confidence of city staff in their ability to carry on this important responsibility for the next five years, without any interuptions to the city's operations.

Based upon the city's request for proposals (RFP) and our understanding and knowledge of the city, we offer a team that is exceptionally qualified to provide professional engineering services for the following reasons:

We have provided these very services to the city for the past 18 years and we have a deep understanding of the city and its needs.

We specialize in providing services to municipalities; we can streamline complex projects, enabling us to meet expedited project schedules.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginq(*ing Services I November 9,2023 4

��A��N=��=0��N������ (cont.)� o�m.��mm~~�m~~m~~��,� K.~~~~~�� �
^ We are intimately familiar with the City of Bell Gardens, its staff and the community, which will save the city valuable time by eliminating any potential learning curve.
^ All of our team members have extensive experience in all facets of municipal engineering including city engineering, traffic engineering, water engineering, and construction management support services. ^ For many clients, including the City of Bell Gardens, we take projects from inception through completion and, therefore, we are familiar with all phases and aspects ofall different types ofpublic works improvement projects. ^ The individuals assigned to the city are supported by our entire staff of professionals and support personnel thereby ensuring that our staff and services are responsive to the city's needs, during the entire time and duration of the contract. ^ For the past lQyears, wehave been successful imapplying for and receiving grant funding for various public works projects and our team isvery familiar with grant writing and funds administration ofpublic works projects. ^ VVeare currently engaged imseveral major improvement projects for the city. |mmost cases, wehave assisted the city to obtain the grant funding and therefore vveare the most familiar with their implementation.

WORK PLAN
Our qualified team includes experienced engineers, project managers, inspectors, plan checkers and support staff that will be available to provide services to the City of Bell Gardens. In addition, we will provide support staff asneeded tosupport engineering and administrative functions. Although the staff members committed to the City of Bell Gardens are assigned a certain number ofhours, staff are available for additional hours toget the job done. The proposed hours for staff members are a guideline for performing the services and additional support staff can be assigned to the city, as needed.

In providing services to the City of Bell Gardens we propose to provide:
^ City Engineer for 4hours per week.
^ Capital Improvement Projects (QP)management for 8hours per week. ctueEngineers, aBowman company | Municipal Enginq(*�PgServices | November 9,2CQ] 5

Methodology (cont.)
City Traffic Engineer for 2 hours per week.

Water Engineer for 2 hours per week.

Development Engineer for 2 hours per week.

Engineering Permit Technician for 6 hours per week.

NPDES support as needed.

Grant writing, public outreach and fund administration on an as -needed basis.

Our detailed work plan for the functions these staff members will perform for the city are listed below.

City Retainer Services
Retainer support services provided to the city include City Engineer, Deputy City Engineer, Development Engineer, Public Works Permit and Inspection, Traffic Engineer and Water Engineer. In addition, NPDES compliance and services will be provided, as needed and as directed by the city. Our assigned City Engineer in collaboration with other dedicated IE staff and our subconsultants will be available to take projects through all phases from preliminary engineering to design, construction and project close out. Services provided to the City of Bell Gardens will include:

City Engineer
The current contract City Engineer or Deputy City Engineer are on -site approximately four hours per week. The City Engineer may spend an additional six to eight hours per week to manage the city's Capital Improvement Projects. All of these hours will be included in the monthly retainer rate. The following are some of the key functions to be performed by the City Engineer routinely:

The City Engineer and all assigned support staff will attend meetings with the City Council, Planning Commission, city staff, public officials, community leaders, developers, contractors and the general public, when directed by the Director of Public Works or the City Administration, on an as -needed basis.

The City Engineer will analyze the city's short and long-term needs, taking into consideration the project budget and the delivery schedules. The City Engineer will recommend and administer short- and long-term programs to meet the city's needs, based on a comprehensive analysis of the budgets, schedules, and the priorities on a daily basis.

The City Engineer will prepare and present a weekly status report on all engineering activities to the Director of Public Works. These reports provide a snapshot of the project status, budget, schedules, issues, and actions by various parties involved with the project.

The City Engineer will review and comment on planning related projects, such as conditional use permits, site plans, sub- division maps, including parcel maps, tract maps, lot line adjustments, easements, dedications and other subdivision map approvals.

The City Engineer will provide consultation and recommendations on various engineering issues including traffic congestion, street signs, NPDES requirements and water systems and services.

The City Engineer will provide consultation and recommendations to Bell Gardens with its participation in the 1-710 EIS / EIR project.

The City Engineer will respond to the public on questions and complaints related to ongoing traffic issues, construction projects, and other engineering questions and issues and provides recommendations and solutions.

The City Engineer will advise the city regarding engineering, construction financing and grant and grant funding opportunities available from governmental agencies and conducts research, writes and submits all related documentation in support of grants on a regular basis.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqc�g Services I November 9,2023 6

Methodology (cont.)
The City Engineer will make recommendations regarding land development projects by ensuring that all improvements and condition of approvals have been incorporated and are followed from project inception, through entitlement, construction and completion.

The City Engineer will establish and maintain effective working relationships with the city staff, utility companies and other agencies on a regular basis to make sure that all public worksrelated tasks and requirements are being implemented.

The City Engineer will also establish a quarterly Utility Coordination meeting with all major utility agencies conducting maintenance work in the city. These coordination meetings will be critical to protect the city's pavement rehabilitation program by coordinating work by utility companies to be performed in conformance with the city's pavement moratoriums and to prevent damage to the city infrastructure.

The City Engineer will meet with city staff to review the Capital Improvement Plan to assist with development of a strategy for project deliveries based on the city's needs, budgets and objectives. On an on -going basis, the City Engineer will review and establish the project scope, schedules, cost estimates and assist with development of the project plans, specifications and cost estimates (PS&E). The City Engineer will maintain a plan review comment matrix and a correction log to keep track of the progress on all capital projects. IE's internal quality control and quality assurance process includes red-team's final review in addition to utilization of a comprehensive check list prior to making recommendation for approval of the final PS&E to the Director of Public Works. The red -team review staff consist of experienced engineers, who bring many years of construction experience and expertise, who will conduct a constructibility review of all projects, prior to issuance of notice inviting bids.

As part of our quality check, the City Engineer conducts a field inspection to investigate every capital project, to determine any adverse condition during the design phase. These field verifications are critical to ensure that items which may have been missed or not identified, such as right-of-way conflicts, field conditions, utility conflicts, and other potential issues, which may negatively impact the project.
. The City Engineer will review and oversee related funding documentations in addition to management on preparation of Exhlafts�ructure Engineers, a Bowman company I Municipal Enginq(*tpg Services I November 9,2023 7

��A��N=��=0��N������ (cont.)� o�m.��mm~~�m~~m~~��,� K.~~~~~�� �
the PS&Epackages continuously, from the planning,through design and construction. The City Engineer will manage the coordination ofthe design package with outside agencies, including those responsible for handling the grant funding. ^ The City Engineer and their assigned staff will address the city's audits in addition to attending meetings with various grant funding agencies toaddress their concerns and toprovide documentation imresponse totheir inquiries. ^ The City Engineer and assigned support staff will assist with other engineering tasks as assigned by the Director of Public Traffic Engineer
Currently, |Eisproviding [ityTrafhcEngineering services two tothree hours per week. Based upon the city'sneed and the project work load, we recommend maintaining the current hours and schedule tobeincluded in the monthly retainer fee. Our staff will provide full -service traffic engineering services tothe City ofBell Gardens, per the current service intervals, however, weare committed and ready toexpand our services, to meet the demand and workload. The services offered will include but are not limited to the following ^ The City Traffic Engineer, will advise and assist all city departments, traffic commissions, various traffic related committees and the City Council onall traffic -related issues. IE will provide detailed traffic safety reports and will interface with regional and state transportation agencies for compliance and various grants funding documentation.
^Our team will provide advice and traffic engineering support tothe Director ofPublic Works, including the preparation of engineering reports, in response to requests for traffic signal installations, traffic signal modifications, new stop signs, new crosswalks, traffic channe|ioatimnand speed zones.
^ The City Engineer, working with the [ityTnafhcEngineer, will provide consultation and recommendations tothe City ofBell Gardens with its participation imthe |7lOEIS /BAproject. ^ Our team will research and prepare grant applications (i.e., HSIP, OTS and ATP) for traffic safety studies and improvements. ^ VVewill identify, review and prepare recommendations for safety and corrective measures at locations, where there have been higher than normal vehicular accidents and traffic violations are anticipated. ^ The City Engineer, with the CityTraffic Engineer, will compile and submit technica|reportsontrafhcengineering-re|ated activities.
^ We will provide analysis and comments on the traffic impacts related to the proposed new development projects. IE will also conduct field investigations to determine any adverse traffic impacts related to new developments. IE will also review and recommend additions of bike lanes and multi modal transportation concepts to be implemented as part of new developments throughout the city.
^ We will identify, review and develop recommendations and mitigation measures for locations with high rates of traffic accidents.
^ TheTraffic Engineer will attend Traffic Commission and City Council meetings, for conducting various presentations on traffic related studies and to provide recommendations, for enhancing the traffic flow and safety in the city on an as -needed basis.
^ The team will provide advice to the city staff on the maintenance and operation of the city's traffic signals, prepare traffic ctueEngineers, aBowman company | Municipal Enginq(*tpgServices | November 9,2CQ] 8

Methodology (cont.)
signal timing plans and prepare traffic signal construction plans and specifications.

We will coordinate with other departments on traffic and parking related issues. IE has conducted many parking studies, to allow on -street parking, by analyzing the off street parking by residents. IE will continue to conduct these studies to ease overflow parking throughout the city.
. We will review, analyze and respond to traffic related complaints and inquiries from the public and support the city with claims and legal issues when required.

Water Engineer
The city owns one-third of the water system in the City of Bell Gardens and has a contract with an outside provider for operations and maintenance. IE has assigned a highly experienced water engineer who has many years of water system design and management. Our assigned engineer, Charlie Marr will support the city's municipal water with the following services:

Continue working and supporting the city with the ongoing projects; Water Resources Development Act of 2022; GWMA Recycled Water Project; Well No. 1, State Planning Grant Amendment No. 2 and #1; Well No. 3C / 3F Destruction; Water CIP Funds - Miscellaneous Reports; Well No. I - Storm Water Discharge Permit. . Attend meetings regarding the city's water quality and management systems. . Review water policy issues and provide recommendations to ensure these policies are aligned with the city's long-term goals and objectives for water safety, quality and economics.

Assess the impact of any proposed new development on the city's water system. IE will review the proposed water usage by new development to identify any system upgrading that might be needed. IE will work with the developers to ensure that any deficiencies or upgrades that are needed to support new developments are designed and constructed in accordance with the city's current and future system capabilities.

Prepare water studies and water master plan. IE will constantly review and monitor the city's water system demands and constraints to identify any upgrades that may be needed to maintain the water capacity and safety for residents and businesses through the city. Water system master plan will be conducted to identify capital projects for maintaining the water system over the next 5-7 years.
. Provide technical advice to the Director of Public Works and city staff in connection with the maintenance and operation of the city's water system.

Assist the city in a variety of water related studies including valuation of the system or the need for rate adjustments.

Additional duties will be performed as needed and directed by the city.

Public Works Permit and Inspection
The assigned Permit Technician will handle public works permits and other engineering -related matters, including receipt and processing of public works permit applications and construction observation of permit work within the public right -of- way.

IE will provide a qualified Public Works Permit Technician who will also provide inspection in support of all activities, related to the city's encroachment permits. Currently, IE staff provides staffing services for a total of four (4) hours per day, three (3) to four (4) days per week. Our proposed staffing services will include a permit technician who will work at the counter for up to four (4) hours per day to assist applicants, answer phone calls related to permitting and will spend four hours of day conducting inspection for the work performed by contractors and utility agencies. We believe that this model serves the best interests of the city, since, our permit technician will continuously be involved with all related permitting activities. IE's permit technician will collect all necessary documents, including, insurance certifications, contractor's licenses, city's business licenses, Traffic Control Plans, and Bonds, if necessary. Contractors will be required to follow Cal OSHA's safety guidelines, Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqS�pg Services I November 9,2023 9

Methodology (cont.)
attend a pre -construction meeting, and follow the permit requirements for traffic safety and roadway restorations. IE will monitor the work of the contractor from issuance of the permit to inspection of all work and closing out the permits, to ensure full compliance with the requirements of the permit.

The assigned Permit Technician will be available to provide administrative support, as needed, to maintain permit files, and provide other assistance to the City Engineer, including assisting the City Engineer with coordination of all construction activities in the city.

The Permit Technician will compile and submit a weekly progress report to the Director of Public Works, detailing all permit and inspection activities. IE will retain and update a log for all permitting activities, and will provide the city with a full report, on all fees collected by the city, on a monthly basis. IE will also conduct a Public Works, permitting fee study, in case this service is needed by the city.

Planning and Development Engineer
The City Engineer will be available to assist the Community Development Department with the following tasks:

The City Engineer will attend meetings of the Planning and Community Development Divisions, meet with city staff, public officials, community leaders, developers, contractors and the general public, to provide technical input when requested. . Staff will provide subdivision map reviews, and perform engineering related plan checking for the new residential development projects.

The City Engineer will review and comment on planning programs and private land development projects.

The City Engineer will provide engineering consultation in connection with the Planning and Development Divisions.

Engineering staff will prepare studies, plans and specifications for development projects.

Staff will review tentative tract and parcel maps, site plans and other submittals and check improvement plans for facilities being proposed by the private developers.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqujing Services I November 9,2023 10

Methodology (cont.)
The City Engineer will establish performance, labor and material bond amounts and development fees for all new
. Construction management staff may also provide field
inspection during construction.

Engineering Consultant Services for Public Works Projects IE will provide full engineering design services in support of public works Capital Improvement Projects (CIP). Under the direction and supervision of the Director of Public Works and the City Engineer, our dedicated design team will take a practive approach for every project that we undertake.

The following summarizes our approach to the design and engineering work on every CIP project:

Conduct project kick-off meetings with Public Works
personnel and will assist the Director of Public Works in reviewing the project. Specific design criteria addressed during the meeting will include pavement lifespan, street crown, preferred rehabilitation strategies, cost limitations and, most importantly, potential cost savings that can be addressed in the design.

Develop a master schedule for all phases of the assigned program and all capital projects contained in the program, including clear identification of milestones for all facets of work.

As part of IE's internal project procedures, all project staff participates in monthly project status meetings with firm principals. The meetings serve as an additional control to ensure all projects move forward on, or ahead, of schedule, and resources are allocated as needed. Furthermore, the meetings allow our staff to be continually aware of project status, schedule and milestones.

Maintain communication with the Director of Public Works, including monthly written status reports and project status meetings, as needed, in addition to reviews at 35%, 65%, 95% and 100% levels of completion. Although monthly reports will be provided, IE will proactively keep the Public Works Director informed of any new developments, issues or factors involved in the project and alternatives to solve any unforeseen items. . In addition to communication, IE staff will prepare agendas of special items that warrant discussion at project status meetings, and prepare and distribute minutes with action items to involved parties.

Convene an initial meeting with key design team members and City Public Works staff in order to review and confirm the detailed project scope, schedule milestones, construction objectives, and other pertinent project details. During this meeting, design criteria and parameters will be discussed, established for each of the various elements, and incorporated into the project.

Useful records pertaining to the proposed work may exist, such as existing improvement plans, maps, as -built drawings, utility plans, reports, studies, and other pertinent information within the projects'lirnits. Additionally, there may be proposed improvements that will affect the design of the project. The design team will review these existing records and incorporate them into the design program as appropriate. The city, county and utility companies will be contacted and any information obtained will be used as a part of the base map.

Perform land surveys for the project.

Perform a site investigation to evaluate the existing condition of items pertaining to the design. During this investigation, Exhlafts�ructure Engineers, a Bowman company I Municipal Enginq@&g Services I November 9,2023 11

Methodology (cont.)
locations of damaged or distressed features will be inspected, confirmed and summarized, if required. Americans with Disabilities Act (ADA) accessibility compliance will be reviewed and non-cornphant features noted. Existing drainage patterns will be reviewed for street projects so that any changes to eliminate poncling can be identified.

Conduct fieldwork to verify the locations of surface utility features within the project limits. During the field investigation, validate the locations of other special features and items such as traffic signal loops. In conjunction with information researched, notify affected utility companies of the impending project. Surface features requiring adjustment will be identified and properly coordinated with the corresponding utility company.

If the proposed improvements interfere with existing utilities, we will arrange to have potholes taken by the utility company. If the utility company has prior rights, we will negotiate with a contractor to pothole the area for a fee as part of extra services. We will provide the city with copies of all correspondence with the utility companies compiled in a book report at the submittal of 95% plan completion, to ensure due diligence and follow-through with the utility companies.

IE will review available existing pavement analysis reports. Based on review of the reports, we will recommend to the city if an additional, supplemental or completely new report of pavement analysis of the subject streets will be needed. Our subconsultant geotechnical engineer will conduct a pavement condition survey of the existing roadway condition. If desired, non-destructive deflection testing will be conducted along streets using the Dynatest Failing Weight Deflectometer to evaluate the structural capacity of the existing pavement.

A base map will be prepared and used for the preparation of the construction drawings. This will show existing features necessary to depict the intended work within the street. As -built plans, field measurements and field survey work will be used for the compilation. The field survey work will be limited to those items and areas necessary for the proposed design.

This includes obtaining adequate topography and cross sections in areas of street widening, as necessary, for proper tie-ins and street cross -fall. This approach is anticipated to present a cost savings to the city while maintaining intent and quality of work.

Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqStpg Services I November 9,2023 12

Methodology (cont.)
Prepare plans to city standards utilizing base mapping z agreed improvement concept. Appropriate city, APWA (
Caltrans standards will be utilized and additional detaili will be included, as necessary, for adequate bidding anc construction purposes.

Prepare a comprehensive set of technical specifications.

All bid items required by the plans or otherwise needed accomplish project construction will be thoroughly des
in the general provisions and included in the contractor list.

Prepare a construction cost estimate for verification of project budget and assistance during the contractors
bidding process. Measurement of units will be containe
the specifications with additional detail for lump sum its as necessary. unitprices will b derived erive14 Ir rorn current bEu information on similar work within the area.

IE will prepare PS&E submittal package for city's review at certain milestones, depending the scope of work for each project.

These milestones are usually at 35%, 65%, 95% and 100%. A final set of signed Mylar plans, along with specifications and estimates, will be submitted to the city for bidding purposes. . Upon completion of PS&E, IE will coordinate with the City Clerk Office's to present to City Council for approval. All council meeting agendas will be coordinated through the Public Works Director.

In addition to the initial Project Definition and Program Development Meeting, continuous coordination and updates will be required between the design team and the Director of Public Works. Progress reports will be provided at appropriate intervals and, as necessary, to document project status. Meetings are generally anticipated after significant submittal milestones and when required to address specific design and coordination issues. In addition, the Director of Public Works will be continuously informed of work status and issues through email, phone and facsimile communications.

IE will prepare as -built plans based on the red mark-up plans provided by the contractor at the end of project construction and submit to the city for their retention and filing.

Construction Management and Inspection Services
Based on our collective experience having managed hundreds of various CIP projects for municipalities throughout Southern California, we posses the knowledge and the expertise to build safeguards in every project that we design and take into construction. In addition, we are intimately aligned with the city's needs, for various improvements that are needed for every type of CIP project that the city plans to build, either now, or in the future.

Our construction management starts with conducting a full review of the plans and specifications and the cost estimates and budget, during the 60% design phase. We will incorporate many of the lessons learned to ensure the plans and specifications are without any discrepancies or redundancies. A second constructibility review will be conducted on the 100% plans, to ensure that all comments and back -checks have been incorporated before, the project goes out to bid. IE will prepare the bid package and supervise the bid procedures to conform with all the State and Federal guidelines, for funding and labor compliance requirements. There are several key elements when reviewing the bid packages. Our goal has always been to Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqeg g Services I November 9,2023 13

Methodology (cont.)
make the plans and specifications and all the attachments clear to understand and to remove any discrepancies that might exist in the documents prior to bidding. As part of our red-tearn review, we will make sure that the review is conducted to ensure that all details are correctly cross-referenced and are clear to read and understand. Other constructibility items include identification of long -lead components on the project, ROW issues, utility verifications, verification of unit prices and quantities. Having in-house design capabilities provides us with access to these services.

The following is a description of major activities in managing every construction project:

1. Construction Management and Resident Engineering /Administration Masoud Sepahi will be our main point of contact for construction management support and staffing services. Masoud brings many years of experience serving the public in a variety of leadership positions. He understands the needs of the City of Bell Gardens for managing various CIP projects currently in construction or in the design phase. Masoud will be complemented by other construction managers and resident engineers, who have managed many of the city's capital improvement projects. IE will be working proactively with the design team to finalize the plans and to carry the projects into the next phase for bidding and awarding construction contracts.

2. Bid Analysis
After bids are received, IE in collaboration with Avant -Garde will review and evaluate bids for accuracy and responsiveness, based on the directions given in the Instruction to Bidders. This review will include checking the entire bid for accuracy, to ensure that all forms have been signed and proper bid -bonds are included, there are no math errors, all the forms have been completed, sub -contractors have been listed with each percent share of the work identified, references have been listed and to make sure that all the license and credentials have been included. The next check will be to call each reference to determine if there are any issues that will have to be investigated with each bidder. Licenses will also be checked to make sure that they are active for performing each trade. Once the initial investigation has been completed and potential discrepancies or issues have been identified, IE will prepare a report, listing all the bidders received and all unit prices for each bid received for the city's review. This report will also include IE's recommendations for awarding a contract to the lowest responsive bidder. IE will also investigate and prepare response to each bid protest, by first notifying and then consulting with the city.

In some unique cases, the City Attorney may be included to review the bid protest. Under the direction of the Public Works Director, IE's construction manager will assist with preparation of the agenda report for getting approval from the City Council to award a contract to the lowest responsive and responsible bidder.

3. Staff Reports
Preparation of staff reports, and executive reports is an important part of construction management on every project. As the City Engineer for the City of Placentia and Director of Construction management for the Los Angeles Metro, Masoud was responsible for the preparation of numerous staff / agenda reports on a variety of projects. In preparation of these reports, Masoud will be utilizing the city's format for each type of report and actions that are needed for approval by the City Council. These reports may be complemented by presentations to be provided under the city's direction.

4. General Construction Administration
Our approach to managing each project will be to collaborate and coordinate our activities with the city's staff and the Director Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqSig Services I November 9,2023 14

Methodology (cont.)
of Public Works in providing as -needed engineering services and at the same time, introduce many of the lessons learned from our past projects. Prior to start of any construction project and / or activity, IE will meet with the city staff to formulate a work plan and a resource allocation matrix for each individual project to build a robust team to administer and manage construction contracts, in accordance with the city's needs and budget.

IE will also establish the individual needs of the project for other necessary services, such as field survey, geotechnical investigations, materials testing, SWPPP, NPIDES Permitting and monitoring, environmental investigations and testing, deputy inspections and other specialty items as required.

5. Filing Systems
In collaboration with the city, IE will set up an electronic filing system for managing all of the future construction projects.

This system will allow the IE team and the city to have access to all construction documents in real-time and to better communicate with the contractors and outside agencies. IE will ensure to follow all grants funding requirements by following the latest guidelines for various programs, through CaltransLAPM, County's SBDG, Metro, and other outside agencies. IE will establish the procedures and we will monitor contractor's compliance with the requirements set forth by the federal and the state's prevailing wage regulations and requirements. IE will prepare and process all the required documentation on behalf of the city to secure reimbursements from outside funding agencies.

6. Pre -Construction Meeting
IE will arrange and conduct pre -construction meetings with the contractors, designers, inspectors, and other key stakeholders. We will ensure to invite all city personnel that may be involved with the project, in addition to representatives from regulatory agencies that may be involved with permitting and grant funding. We will also request that subcontractors be present at the pre -construction meeting. IE will arrange for a weekly progress meeting, to review the project status, request for information (RFI) log, change orders, project issues, etc. Our field crew and inspectors will review the plans and all the submittal documents and will conduct a pre -construction survey, by inspecting the entire job and taking photographs before Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqeg g Services I November 9,2023 15

Methodology (cont.)
and after the completion of the construction. Our daily logs will include daily photos showing site and weather conditions; traffic control measures taken by contractors: labor, equipment and materials used; quantity of work performed; and major incidents / safety violations. We will prepare appropriate electronic logs for keeping track of these activities and will discuss them during our weekly progress meetings.

7. Quality Control and Materials Testing
To control the quality of work on any construction project, a number of provisions must be built into the contract documents.

In addition to the requirements by the Standard Specifications for Public Works Construction (Green Book), which sets the minimum standards for controlling the quality at the job site, IE will evaluate and determine individual needs of the projects for a robust CIA / QC program. These provisions will need to be written into the contract documents, so that the contractors provide an adequate testing program, necessary for meeting the requirements of the project. As part of our monthly reporting, a section will be dedicated to the CIA / QC program, summarizing the testing and a review of the contractor's performance, on a regular basis. IE team will evaluate the contractor's performance and will recommend changes as necessary. IE inspectors are provided with the latest technology for documenting and reporting daily activities and are dedicated and trained to make sure the construction work is being conducted in a safe and expeditious manner.

8. Submittal / RFl Review and Precessing
IE will review and process contractor's submittals by first preparing a submittal -list for each contract. All submittals and deliverables that are required by the contract will be logged through the IE's project management system and routed to the project's architect and engineers for review and approval. IE will meet with the city prior to bidding, to learn more about the city's requirements for purchasing equipment that is compatible with the city's existing infrastructure. We will also ensure that proper warranties are stipulated for certain items per the city's needs to ensure that the maintenance and longevity of these systems are secured over the long haul. We will also add attic stock to be purchased by the contractors for the city's future use in maintaining the city's assets and infrastructure. IE will include the city staff in the submittal reviews to make sure that the city has an opportunity to review these items. We will also arrange for any special inspections and training, that may be required.

9. Change Order Review
Upon receipt of a change order request, IE will promptly investigate the field conditions to determine if a change in condition may exist. In case the site conditions involve a hazard, IE will work with the Contractor to resolve the issue immediately under a time and materials basis. However, as it was mentioned earlier, IE has learned that every change order should start with a RFI by the contractor. All changes to the original plans and specifications will have to be reviewed by the design engineers first, so that a formal response can be attained, and changes are fully documented. IE will keep track of the change orders through the city's electronic project management system and on the IE's monthly executive summary reports. IE will be managing all change order work starting from field inspection to the final payments, by first verifying them with the designers and then the city. Change orders will be reviewed, and a determination will be made on the merit quickly and expeditiously. Change orders come in variety of ways, and it is IE's responsibility to determine the cause and to provide a direction to the contractor quickly.

In our experience, change order management is one of the key elements in establishing a firm but fair relationship with the 10011H11MM,
Exhlafts�ructure Engineers, a Bowman company I Municipal Enginq@jJng Services I November 9,2023 16

Methodology (cont.)
IE takes safety seriously. We know that even one incident on the project will taint the project. As a standard practice, at the beginning of each meeting, we draw attention to a safety moment. This is to ensure that all parties and the construction team make safety on the job a priority. We believe that safety must be built into the culture of the construction team, and it must be the underlying condition for conducting any type of construction work. IE will make sure that the latest CAL -OSHA provisions have been incorporated into the contract documents and we will monitor the job daily to ensure that all safety precautions have been placed at the job site every day. At the pre -construction meetings, IE will ask to see the Contractor's Health and Safety plan and to make sure that a Safety Office has been identified by the contractor at the onset of the project, and before, construction starts. IE will ensure to document and report any incident or deficiencies that may exist on the project and will be pro -active on stopping work that is being conducted without regard to safety precautions.

11. Progress Payments
IE team will meet with the contractor prior to the first day of the month to review the progress payment summary and to conduct a field review of all work performed. Every progress report along with daily logs and correspondences will be reviewed to ensure that the progress payments are accurate and represent a true picture of the work that has been completed. Retention of the funds will be in accordance with the contract and the inspector and the construction manager will sign on the progress payment request, prior to submission to the city for processing. All approved change orders will be listed on the payment requests along with a comprehensive progress report, on all pending change orders and claims.

12. lnspections
Daily construction logs shall be provided for the city's review on IE's web -based project management systern.The project inspector will review construction progress schedules on a regular basis to verify that the project is on schedule and on track with project milestones. The project inspector will provide accurate measurements of the work completed by contractors in accordance with contract documents, in addition to the review of the soil compaction and materials testing reports and Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqStpg Services I November 9,2023 17

Methodology (cont.)
certifications of compliance. IE will also review the material testing reports regarding quality of work completed. Inspectors will ensure that failed tests are reported and direct the contractor to take correction actions to achieve full compliance. We have vast experience with installing utility work and will monitor the contractor's excavation work to prevent and minimize utility conflict delays and potential conflicts. We will achieve this by conducting potholing, which will be required by the contract, and by a thorough review of the as -build drawings. IE will prepare and submit to contractor a "Weekly Statement of Calendar / Working Days" report to ensure that the contractor is fully aware of the schedule and the critical path activities. Our inspectors have been trained to monitor various contract compliance provisions, as required by the city and outside funding agencies.This is to ensure that these provisions are being followed by the contractors. These provisions may include special traffic safety and access issues, job site protection for safety, SWPPP and NPDES monitoring, CASp certification and inspection, labor compliance postings and any other special requirements of the Contract.

We have found that compliance with the latest codes should be built into the design and carried over to construction. IE inspectors will also make sure that the contractor is following all the traffic coordination and permitting. We will coordinate with the contractor to make sure proper access to adjacent businesses / residents has been provided during the duration of construction. As noted earlier in the proposal, IE prepares a monthly status and progress report for each one of our clients and each project. These reports will include budgets, costs, schedule, and resource allocation for each project, submitted each month for the city review and approval. We found that this method of reporting works well, providing the city with a document that has all of the key project data in one place. These reports will include discussion on change orders, claims, schedules, and any other key issues that need direction from the city for managing the project. Our project manager Mr.

Sepahi will meet with the city's project manager individually to go over the report and to point out any issues that might be going on with the project, which requires city's attention. Key decisions will be made at these meetings, which will provide directions for a successful project delivery.

13. Claims
Claims management starts even before the bid & award process. We have listed a number of ways that we propose to avoid claims as part of the pre -construction phase services. We have also mentioned several safeguards for incorporation into the contract documents to eliminate claims as much as possible. However, our approach to managing claims is based on our 30 years of experience having managed numerous public works CIP projects. We will encourage and ask the contractor to submit BFI's on every issue encountered on the job site, to document each potential change. We will investigate these claims and respond back to the Contractor in a timely manner, after the engineer of record has provided our team with a formal response. We will then document all potential claims and notify the city's project manager on the status of these claims and potential change orders on a weekly basis. All RFIs, claims and change orders will be handled through the city's electronic project management system. Our goal has always been to work with the contractor to resolve all claims and process all change orders expeditiously by taking a pro -active approach. In our experience the best way to handle claims is to deal with them quickly and decisively.

14. Prevailing Wage / Labor Compliance
Prevailing Wages are required in accordance with the provisions of the Labor Code of the State of California. General prevailing rate of wages are applicable to all construction contract and IE will ensure that the Contractor is compliant to this rule, during the entire contract duration.

We will accomplish this goal by taking a proactive approach to receiving and documenting certified payrolls monthly. We will also make sure these reports are uploaded to the Department of Industrial Relations Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqS§ig Services I November 9,2023 18

Methodology (cont.)
every month. IE team will also be conducting labor interviews to ensure compliance with all the employment requirement and wage rates required by the State's wages and hour laws. IE will also ensure that the Contractor complies with all of the statutory requirements relating to the employment of apprentices and the city's labor requirements.

15. Project Closeout
The project close out starts early, before taking substantial completion on any construction project. IE will start working with the Contractor to collect all the required product data, pamphlets, owner manuals and will arrange for training on new systems for the staff and employees. IE has performed many formal commissioning on complex projects and will ensure that all new systems have been tested and perform per the intended design and specifications.

IE will review and process contractor's final payment request and release of retention, in addition to assisting the city with preparation and filing of Notice of Completion once the project has been accepted. IE will organize and deliver all project documents and files, in addition to the grant funding forms and ledgers to the city for future use. All reports, daily logs and other related construction documents will be submitted to the city electronically. All as -build plans will be collected, checked for validity, and sent to the Engineer -of -record for incorporating them into the final as -built drawings. IE has also GIS capability in-house, and can provide the city with a GIS database for all work performed by the Contractors.

16. Community Outreach
IE understands that a successful project must involve the community. IE will prepare all the printed outreach materials and project fact -sheets, working with the city's Community Liaisons to inform the public of upcoming construction activities and to collect and document all input and comments received from the public. We have performed similar services on other projects, and our team is ready to engage with the public on an as needed basis. Our public outreach coordinator will be Cali Hildebrand, who brings many years of experience supporting cities with similar outreach initiatives.

17. Federal Requirements
Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqq8jtng Services I November 9,2023 19

Methodology (cont.)
Having managed a variety of public improvement projects, supported by funding from outside agencies, IE team in conjunction with Acant-Garde is fully aware of the requirements posed by the grant funding rules and regulations. IE team will ensure that all the funding regulations by the city, state and federal laws are being coordinated and all the forms are fully executed. IE will also ensure that the contractor and their subcontractors and suppliers and vendors comply with the state and Federal orders regarding affirmative actions to ensure equal employment opportunities and fair employment practices.

NPDES Compliance and Assistance

1. Industrial /Commercial Facilities Program
IE has successfully inspected all industrial / commercial facilities within the City of Bell Gardens a total of three times. After several rounds of inspections, IE has developed a database for all commercial and industrial facilities that is frequently updated. Our approach to inspections is to first confirm the facilities' BMPs are being effectively implemented in compliance with municipal ordinance. Our inspectors verify that the business is implementing effective source control BMPs for the pollutants generated by the commercial activity. If the BMPs are not adequately protective of water quality, we require additional site -specific controls. Each inspection is to be documented by an inspection report that includes a summary of the inspection with photographs. In the future, when the city obtains ArcGIS, we will send the SKIP file for the city's records. The schedule will be provided to the city and the GIS file is updated automatically each working day as the inspections progress in real time. We shall also supply a link of completed inspection reports that will be updated at the end of the week to make it easy for city's to track our progress in confirming schedule deadlines.

As part of the inspections, our team takes advantage of the opportunity to fulfill the Business Assistance Program. IE implements the requirements of the Business Assistance Program by providing technical information to businesses to facilitate our effort to reduce the discharge of pollutants in stormwater. We accomplish this by providing California Stormwater Quality Association (CASQA) Industrial and Commercial BMP guidance specific to each business. We aid by explaining the material in the CASQA handout and by identifying solutions highlighted in the handout to bring the business to compliance. Our team provides on -site and over the phone technical advice, both of which are logged in our electronic database. Many owners and operators contact our team to discuss potential solutions or if they have any questions regarding the BMP handout, we provide consultation to them and even go back to the site to discuss in person.

The City of Bell Gardens has two businesses with an Industrial General Permit. Within the Stormwater Multiple Application and Report Tracking System (SMARTS) we verify appropriate WDID number, and if all reporting requirements are fulfilled for stormwater discharges associated with industrial activities. As part of the program, our staff also searches through the business license list provided by the city to identify if any business based on SIC codes are required to obtain an IGP. Any business that is not in compliance or resists complying will be issued a violation letter. Our team will coordinate with code enforcement to issue violation letters to bring the facility into compliance.

2. Planning and Land Development Program
As part of the Planning and Land Development Program, Jay Shih shall coordinate with the city's Community Development Department to obtain a list of agreements with developers for both new developments and redevelopments over the past ten years to review and identify all BMPs and their maintenance requirements. We shall dedicate a GIS layer to map the BMPs and create a schedule to inspect them all. There is a total of five Exhlafts�ructure Engineers, a Bowman company I Municipal Enginq(Uing Services I November 9,2023 20

Methodology (cont.)
QSPs serving the city that are capable of inspecting BMPs and creating reports and logs highlighting their discoveries and recommendations. GIS is the perfect tool for this purpose and can be used to alert our staff two years after the inspection has been completed to inform inspection commencement deadlines.

IE will request to be incorporated as part of the review process prior to issuing approval for final occupancy. Our function will be to review operation and maintenance plan, monitoring plan and to verify ongoing maintenance provisions for LID practices. Part of the review will confirm that all priority development projects retain on -site Storm Water Quality Design Volume (SWQDV). CEQA mitigation requirements will also be reviewed by our team to make sure they abide by all environmental requirements.

3. Development Construction Program
Our construction management department led by Masoud Sepahi comprises of many talented construction managers and inspectors that are intimately familiar with all Construction Program requirements set forth in the NPDES guidelines. All erosion control and sediment control plans will be reviewed and approved by our QSD / QSP personnel and will be on site as part of the inspection team to confirm adherence to all requirements to prevent illicit construction -related discharges of pollutants into the MS4 receiving waters. On the field our team will ensure all non-stormwater management and waste management housekeeping practices are adhered to.

For construction sites greater than one acre, our GIS specialist will create a separate layer to develop an electronic system to inventory grading permits, encroachment permits, demolition permits, building permits and construction permits. As part of our inspection program, our inspectors will confirm that the project is enrolled in the Construction General Permit with an active WDID number and that the accompanying SWPPP shall be fulfilled.

4. Public Agency Activities Program
Our team understands that the intent of the Public Agency Activities Program is to prevent and minimize the impacts from MS4 discharges from Permittee-owned and operated
facilities and activities. Our GIS specialist will have a designated layer for public facilities and activities such as parking lots, golf courses, swimming pools, materials storage yards, roads, catch basins and much more. IE
will maintain and update the accuracy of the inventory
through collection of new information obtained through
field activities. All personnel will be equipped with a device accessible with CIS to be able to update any information regarding such facilities in real time.

5. Illicit Discharge Detection and Elimination Program
IE will develop a program to where we shall act as the
database hub for collecting and monitoring Illicit Discharge reports from all departments. Our CIS Specialist shall
create a layer to highlight all the information collected from the responder and reporter. Latitude and Longitude information collected from the report will be utilized to drop pins for all locations and will create a reminder to Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqVing Services I November 9,2023 21

Methodology (cont.)
confirm that the issue has been resolved. Included in the GIS will have information pertaining to the source investigation discoveries and discharge elimination methods. The discharge elimination method will comply with the city's spill response plan that includes procedures to prevent, contain, and respond to all spills that may discharge into the MS4.

6. Public Information and Participation Program
As part of our commitment to educate the public IE will continue to reach the general population and ethnic communities regarding water quality priorities. Cali Hildebrand, our public outreach specialist has experience in creating story maps on ArcGIS and is experienced in creating brochures utilizing Al technology. It is in all our best interests to help the public understand the importance of stormwater management for environmental quality and local water resiliency. Brochures will be created in both English and Spanish and uploaded to Internet -based platforms, provided at commercial points of purchase, schools and community events. As part of the program Cali will also document and track the measured effectiveness in achieving our goals in educating the
community. From the results of the feedback received, we shall continue to evaluate our current materials and enhance them to better suit the city's needs in achieving community participation.

7. Watershed Management /TMDL Programs
In 2012, Aidan Mousavi attended the first Los Angeles River Upper Reach 2 (LAR UR2) Watershed Management Program
(WMP) meeting on behalf of Bell Gardens with the cities of Bell, Commerce, Cudahy, Huntington Park, Maywood, and
Vernon. Since then, IE has been involved with developing the Watershed Management Program for the City of Bell Gardens and achieving the milestones set forth in the plan. The WMP clearly characterizes water quality challenges and describes implementation actions and activities to demonstrate that MS4 discharges achieve applicable Water Quality -Based
Effluent Limitations (WQBELs) and do not cause or contribute to exceeciances of Receiving Water Limitations (RWLs). The WMP also enables the iterative Adaptive Management Process (AMP) strategy which IE will update every two years per MS4 requirements.

The development of the WIMP took two years and is a report our team in the watershed are very proud of. It also identifies structural and non-structural Watershed Control Measures (WCMs) that we still use to this day to address water quality priorities. The Water Quality Objectives (WQOs) were set using the calibrated model identified in the Reasonable Assurance Analysis (RAA). Due to our history in developing the WMI? IE is intimately aware of all the requirements the city is responsible for when achieving a successful implementation.

The relevant Total Maximum Daily Loads (TMDL) applicable to the LAR UR2 Watershed Management Area (WMA) are Nitrogen Compounds, Trash, Metals and Bacteria. Applicable target deadlines to address all relevant TMDLs extend to the year 2037 and IE has been assisting the group reach their milestones. The identified method to achieve the city's goals is through a mix - use of BMPs for infiltration, detention, constructed wetland, treatment facility, low flow diversion, site -scale detention, green infrastructure, flow -through BMP and Source Control Treatment BMPs.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqq&g Services I November 9,2023 22

Methodology (cont.)

8. Monitoring and Reporting Program
As with the WMI? IE spent two years in the development of the Coordinated Integrated Monitoring Program (LIMP) for the City of Bell Gardens which will allow implementation of integrated approach to support the AMP as intended in the MS4 Permit. In the CIMP, seven stormwater outfall-based monitoring sites are proposed which have water quality collected annually, from over 70% of the LAR UR2 WMA. The LIMP proposes both stormwater and non-stormwater outfall-based monitoring that will support the Cities Illicit Discharge Elimination Program. IE will follow the requirements set forth in the Monitoring and Reporting Program (MRP) to assess the chemical, physical, and biological impacts of MS4 discharges on receiving waters and compliance to TMDL wet -weather and dry -weather numeric limit Waste Load Allocations (WLAs). IE will utilize the LIMP results to identify and characterize pollutant loads and sources to improve the effectiveness of pollutant controls implemented. Annual Reports and Serni-Annual Reports information will be collected all year and incorporated into GIS so that reporting will be readily available for the Director's review two months prior to the submittal deadline. We understand the seriousness of providing accurate reporting data which is why we will utilize GIS in organizing all information year-round and not collecting information before the deadline.

9. General Stormwater Compliance Consultant Assistance
It is of vital importance to act as the city's representative when coordinating with all agencies such as LARWQCB, SWRCB, EPA, etc. while also providing bi-weekly updates to the city staff and elected officials regarding all NPDES-related activities.

Our team is not only aware of the requirements set forth in the permit, WMP and LIMP but also has the expertise to provide hydrology analysis and to design various stormwater quality projects such as infiltration wells, storage tanks, wetlands, diversion facilities, detention basins, biofiltration, permeable pavement and more. IE can provide reporting, design, cost estimation and has relationships with vendors to be familiar with long lead items to propose alternative solutions for quick construction. IE has also worked with Measure W to obtain funding for various projects such as the Veterans Park Project. We are aware of all Safe Clean Water funding requirements and envision securing additional funding for future projects.

Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqqB*g Services I November 9,2023 23

Methodology (cont.)
Environmental Compliance and Permitting
Preserving the environment is essential to the health and safety of our society and is an important service to IE. With a focus on minimizing environmental impacts, IE offers cost-effective solutions to clients in the public sector, the private development industry, and within the conservation community on how to deal with issues such as water scarcity, climate change, managing environmental liabilities, regulatory obligations, risk management, and good environmental stewardship.

IE offers a unique portfolio of extensive experience in natural resource inventories, wetland delineations, habitat assessments for threatened and endangered species, and surveys for conservation, development and infrastructure improvement projects. We also provide environmental services such as planning, compliance, and permitting, and we have developed, or contributed to, numerous regional habitat conservation plans (HCPs), statewide parks planning assessments, and endangered species research, planning and compliance projects.

What We Do Best
History of successfully providing environmental
services, with particular expertise in services related to natural resource identification, management,
conservation, and planning.

Finding cost effective solutions to protect the
environment and navigate ever -changing local, state,
and federal regulatory requirements.
. Keen understanding of market demands and trends.

We help to deliver smarter, healthier, and
environmentally sensitive communities.

Our Experts
Bowman is passionate about finding the best solutions
for our clients, and strives to provide innovative
answers to their environmental needs. Our licensed
professional staff includes®
. Professional Wetland Delineators
. Qualified Environmental Professionals
. Certified Wildlife Biologists
. Certified Arborists
. LEER' Accredited Professionals
Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqq8tig Services I November 9,2023 M

Methodology (cont.)
Natural Resource Surveys and
Assessments
Wetland and Waters of the U.S.

Delineations
. Natural Resources Inventories
Wildlife and Vegetation Surveys
Threatened and Endangered
Species Surveys
Habitat Assessments
. Habitat Conservation Plans
. Forest Stand Delineations
Water Quality Assessment
Soils, Geological, and
Geornorphological Assessment
Chesapeake Bay Preservation Area
Studies
Environmental Planning and
Management
Natural Resources Management
Plans
Endangered Species Conservation
and Management
Land and Wildlife Management
Plans
. Forest Conservation Plans
Wetland Creation and
Enhancement Design
Stream Restoration and
Enhancement Design
Native Vegetation Restoration
Conservation Easement Baseline
Reports and Inspections
Urban Redevelopment
departments work in concert to prov
your project needs in-house. We focu
through at every phase of your proje
Environmental Compliance
Section 404 / 401 Permitting and
Compliance
Wetland and Stream Mitigation
Monitoring
State Based Environmental Compliance
Documentation (Ex. CEQA)
NEPA Documentation
Section 7 Endangered Species Act
Consultation
Cumulative Effects Assessment
NPDES Permitting
Stormwater Pollution Prevention Plans
Phase I Environmental Site
Assessments
Phase 11 Environmental Site
Assessments
Hazardous Waste Management
Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqq8itng Services I November 9,2023 25

Management and Staffing

u
mr
cs
E
0 M cc
r LU
m Ln
I
I

1 M",

1 M",

1 M",

1 M",

Sid Mousavi, MSCE, PE
Principal -in -Charge
Education Experience
M.S. Civil Engineering, California State Principal -in -Charge I City of South El Monte, CA Polytechnic University, Pornona Responsible for contract oversight of capital projects for the city, which included B.S. Civil Engineering, California State the Safe Route to School Project (Pedestrian Improvement Project), Durfee Avenue Polytechnic University, Pornona Project (Street and Median Improvement Project), Thienes Avenue Project (Street B.S. Irrigation Engineering, Azerbaijan Improvement Project), and the NewTernple Park Improvements (Prefabricated Modular Restroorn).

University, Iran
Registrations Responsible for approving all capital projects for the city and providing cost Professional Civil Engineer: estimates and budgets for new and upcoming projects. Supervised various California (#42645) Infrastructure Engineers projects as the designated Principal -in -Charge. Participated in development meetings and provides support for various land development projects by establishing conditions for approval of projects. Supervised and directed traffic engineering and water engineering activities of the city. Attended City Council meetings and provided reports of engineering projects to the City Council. Oversaw the city's NPDES program and MS4 Permit compliance.

Principal -in -Charge I City of Brea, CA
Principal -in -Charge. Responsible for oversight of performance of professional services to provide plans, specifications and estimates (PS&E) for rehabilitation of alleys east of Brea Boulevard and south of Imperial Highway to Date Street, Downtown Parking Structure I Sewer Line Upgrade, and Sewer Main Repair in Alley west of Brea Boulevard and south of Imperial Highway.

Principal -in -Charge I City of Lynwood, CA
Provided oversight of design, construction management, and inspection of street improvements for Linden Street, Virginia Avenue. Walnut Avenue, Redwood Avenue, Elmwood Avenue, Olanda Avenue, and Las Flores Boulevard. The project included topographic surveying to address the drainage issues, removal, and replacement of broken or missing gutters and curbs, subsurface investigation of the existing asphalt structure, replacement of existing damaged or substandard driveways, removal and replacement of trees that have caused damage, design of ADA-cornphant ramps, and repair or placement of sidewalks, where necessary. IE also provided bid administration, construction management services, and inspection for these projects.

Interim City Manager, Director of Public Works & Planning and City Engineer City of Baldwin Park, CA
Served as Interim City Manager during a 14-rnonth vacancy at the City of Baldwin Park. Responsible for the development of the $40M annual operating and capital budgets, including the identification of new revenue sources for the city. Involved in labor negotiation with seven city labor groups. Also responsible for the enhancement of the city's public information and public relations materials, policy -'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqqr�g Services I November 9,2023 31

Sid Mousavi, MSCE, PE
Principal -in -Charge
development and implementation, and general administrative oversight of the city's six departments and more than 300 employees. As Executive Director to the city's Community Development Commission, directed the city's redevelopment activities.

Also served as Executive Director of the Baldwin Park Housing Authority, which provided housing services for Baldwin Park as well as the cities of Duarte, El Monte, Monrovia, and West Covina.

City Engineer I City of Bell Gardens, CA
Served as the City Engineer under a general contract to provide City Engineer services. Responsible for all capital improvement programs, land development, traffic engineering, water engineering and redevelopment engineering.

City Engineer I City of Montebello, CA
Responsible for all the city's engineering issues and projects, including overseeing the city's engineering staff. Also served as secretary to the Traffic Commission, preparing all reports and projects to the Engineering Division.

City Engineer I City of La Puente, CA
Directed all the city's engineering issues and projects. Responsible for the engineer's budget and all engineering staff who were Infrastructure Engineers employees working in City Hall. In addition, developed capital improvement programs, approved designs, and implemented projects.

Interim City Manager, Director of Public Works & Planning and City Engineer City of Baldwin Park, CA
Responsible for the direction and administration of a staff of 373 and budget of over $33M. Responsible for such achievements as: reorganization of departments, employee development program, construction of Metrolink station, construction of 9-acre park facility, pavement management program, energy management system, eradication of graffiti within city, bridge rehabilitation, transit program and signal Director of Public Works and City Engineer I City of Diamond Bar, CA Upon the city's incorporation, Sid was hired to set up the Public Works Department, with responsibility for direction and supervision of all public works functions. While with the City of Diamond Bar, interfaced with official offices such as City Council, City Commissions, City Manager's office, and other city departments and staff. Additional agency coordination included working with Caltrans, Los Angeles County agencies, Air Quality Management District, Walnut Unified School District, and community citizens and businesses.

Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqqrAng Services I November 9,2023 32

Masoud Sepahi, PE, LEER GA
City Engineer and Director of Construction Management Services Education Experience
B.S. Civil Engineering, Loyola
City Engineer I City of Placentia, CA*
Marymount University
Masoud's responsibilities included management and processing of all public works Structural / Civil Engineering,
encroachment permits in addition to all other city engineering and management California State University, Northridge
functions. Masoud was responsible for plan check, design review, and inspections associated with private developments throughout the city. He assisted the Director Registrations
of Public Works with preparation of the Capital Improvement Program (CIP) budgets and monitored the expenditures in conformance with the Department's goals and Professional Civil Engineer:
objectives. He managed all design and construction contracts associated with the California (#52786)
public works CIP program to ensure delivery of projects on time and on budget.

Leadership in Energy and
Masoud supervised and assigned work to in-house engineering, maintenance Environmental Design Green Associate
staff and consultant staff associated with CIP and plan -checking activities. His (LEER GA)
responsibilities also included negotiating and enforcing design and construction contracts, cooperative agreements, interacting with other cities and agencies, license agreements, lease agreements, schedules, and work plans to ensure projects were completed within expected timelines, material specifications, and budget.

He reviewed change orders, evaluated budgets, costs, and technical feasibility.

Conducted staff meetings with city personnel; attended meetings with other city departments, government agencies, private developers, contractors, and consultants to coordinate various projects and programs. Prepared schedules and budgets for various projects and assist with preparation of the CIP and grant applications.

Reviewed and approved tract maps, parcel maps, lot -line adjustments and provided advice to the City Administrator, planning and City Council regarding engineering and administrative issues. Prepared Agenda Reports on various actions required by the City Council. Attended City Council, Planning Commission, Traffic Commission, and other public meetings and made presentations on various engineering and construction proposals, contracts, engineering reports, and staff recommendations.

Los Angeles Metropolitan Transportation Authority I City of Los Angeles, CA* As the Director of Construction Management, Masoud was responsible for the southerly portion of the Crenshaw / LAX Transit Project. This project was an eight - and -a -half -mile light -rail line, which connects the Expo Line on Exposition Boulevard to the Metro's Green Line at the Los Angeles International Airport. This $2B project consisted of eight Stations, eight aerial bridges over major streets and the 1-405 Freeway. During his tenure with LA Metro, Masoud was responsible for management of all construction on the southern segment of the project, extending from the Greenline station to the outside of City of Inglewood. His responsibilities included management of the entire construction staff, reporting to executive management on construction progress and issues in addition to interfacing with the city officials, utility agencies, contractors, and designers. Also, working for Metro, Masoud was responsible for the management of three major Advanced Utility Relocation -' Contracts as part of the Purple Line Corridor Project. This project extended the Experience prior to the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqqring Services I November 9,2023 33

Masoud Sepahi, PE, LEER GA
City Engineer and Director of Construction Management Services terminus at Wilshire/ Western westward for about nine miles with seven new stations.

He performed Resident Engineering for three major contracts under this $4B transit project. Responsible for all of the utility relocations at three major intersections, La Brea and Fairfax in the City of Los Angeles and La Cienega at the City of Beverly Hills.

Duties included management of construction and design staff, interaction with utility agencies, contractors, designers and city officials.The advance utility contracts paved the way for mass excavation of the subway stations. The relocation of over 150 major utility lines had to be designed and constructed within a very aggressive schedule to allow for the next phases of the project to start. As the Director of Construction Manager, Masoud was responsible for delivery and relocation of major storm drains, sanitary sewer, electrical power lines, telecommunication, water, gas, and many other utilities, which had to be relocated within a very aggressive schedule.

MARRS Services I Fullerton, CA*
Principal. As the principal for MARRSfacilities, and transit divisions, Masoud was responsible for managing construction management staff and multiple contracts with various public agencies. His responsibilities included management of multiple civil engineering projects, reporting to executive management and interaction with clients. His other responsibilities included development and implementation of marketing strategies, preparation of staffing plans, preparation and analysis of company budgets and finances in addition to interaction with existing and potential new clients. Some of the major projects under his management included: LAX / Crenshaw Transit Corridor, Advanced Utility Studies, LAWA Water Systems modeling, LAX 2nd Level Roadway and Deck Repair, Metro On -call bus Facility construction management, Cesar Chavez Roundabout Project, LAX South Runway Improvements in addition to many other infrastructure improvement projects.

GKK Works I Irvine, CA*
As Program Director, Masoud was responsible for GKK's Construction Management for various public works facility projects. Some of these projects included: Police Administration Building, San Bernardino International Airport Facility Improvements Program, Third party review for all new developments for the Inland Valley Development Agency (lVDA.), runway drainage studies, conceptual design and modifications for terminal buildings, facility and site assessment, demolition of buildings and facilities at the airport, master planning, and third -party reviewer for construction of large warehouses for the lVDA. On behalf of lVDA, he also worked with private developers for development of large cargo storage and distribution centers near the airport.

Kellogg Brown and Root (KBR) I CA*
As the KBR's Construction / Design Manager for the western region, he was responsible for KBR's projects in the Southern California region. His duties included contract negotiations with clients and sub -consultants, managing and administering Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqqq�g Services I November 9,2023 34

Masoud Sepahi, PE, LEER GA
City Engineer and Director of Construction Management Services projects in addition to managing engineering staff and sub -consultants. As the design manager for the Airside Improvement Program (AIP) at Bush Intercontinental Airport, he was responsible for the management and supervision of the design staff and up to 100 sub -consultants. His responsibilities also included management of multiple design contracts to ensure compliance with the project budget and schedule in addition to the client's guidelines and regulations. Provided routine project status reporting on the work performance and productivity of designers and their subconsultants. He also reviewed and approved designer's invoice for compliance with provisions in the contract including minority participation requirements. He managed the design and construction of many projects, under the AIP program
Project / Construction Manager I City of Los Angeles, CA* As a City of Los Angeles engineering staff, Masoud worked on many infrastructure programs and projects, some of which include the Police Bond Program, Los Angeles Convention Center Expansion, Tom Bradley Terminal at LAX and many other small to large municipal facility construction and renovations. Masoud worked at the Departments of Public Works and Building and Safety, where he was responsible for plan check activities for Public Works improvements in addition to residential and commercial buildings. He was responsible for reviewing and evaluating the work of professional and technical employees engaged in the preparation of designs, plans, specifications, estimates, environmental studies, budgeting, scheduling and reports on major engineering projects. Supervised and directed engineering staff and activities in connection with design, construction, maintenance, inspection, and operation of a wide variety of engineering projects. As part of the Earthquake Recovery Division, Masoud managed the recovery and renovation of buildings after the Northridge earthquake in the San Fernando Valley.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqq�g Services I November 9,2023 35

Douglas Benash, PE, QSP / QSD
Development Engineer, CIP Manager and Water Quality Engineer Education Experience
B.S. Civil Engineering, California State City Engineer I City of La Palma, CA University, Pornona
Douglas acted as the City Engineer at the City of La Palma for three years. His Diploma in Roads Computer Program,
tasks included reviewing design professional proposals to prepare project California State Polytechnic University,
construction documents, coordinating and scheduling with staff, managing the Pornona
Capital Improvement Program, overseeing the staff management through project completion, and providing analysis of requests for information, change orders, time Registrations
/ material verification and project closeouts. Douglas also worked on a variety of projects including, but not limited to, street improvements with concrete repairs Professional Civil Engineer:
and ADA improvements on local residential streets, La Palma Avenue and Valley California (#53935)
View street improvements, Community Center flooring, and engineering water well Qualified SWPPP Practitioner (QSP)
casing improvements. Douglas coordinated with the City of Cerritos for the bridge / Qualified SWPPP Developer (QSD):
replacement project on La Palma Avenue / Del Arno Avenue Coyote Creek crossing.

California (#53935)
This project involved coordination between Orange County and Los Angeles County funding agencies, OCTA, Caltrans, and Metro.

He provided development review to establish projectsconditions of approval while working with the Community Development Department on multiple development projects, including but not limited to, a McDonald's restaurant remodel, Center Pointe commercial development parking improvements and industrial parking and storm water improvements, including filing of environmental documentation per CEQA. Douglas was responsible for preparing and presenting City Council staff reports and Traffic Safety Committee reports. Furthermore, he worked with staff to prepare OCTA grant funding applications for street and storm drain improvements; and documentation preparation to maintain OCTA Measure M street improvement funding. Lastly, Douglas worked with staff to coordinate storm drain improvements, sewer improvements, traffic engineering services, and regulatory compliance as well as providing direct coordination with the Public Works Department staff.

City Engineer I City of Bell Gardens, CA
Responsible for division -wide, high-level leadership, management, supervision, and administration of an engineering division, its staff, and extended resources. Plans, directs, supervises, and reviews activities of the division, including CIP projects, land development, and databases. Works with all phases and types of municipal infrastructure projects and all levels of personnel to see those projects through to successful completion.

City Engineer / Deputy Director of Public Works I City of Monrovia, CA Doug managed the engineering operations for the city, inclusive of budget, development and redevelopment projects, capital improvements, regulatory compliance, general and traffic engineering, utilizing the staff to complete the priority projects of the Department. In addition, he had continued and initiated several -'Experience prior to joining the firm programs to implement environmental accords focusing on storm water, flood Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqqrtpg Services I November 9,2023 36

Douglas Benash, PE, QSP / QSD
Development Engineer, CIP Manager and Water Quality Engineer control, LEER building standards and utility impacts for the city. Doug performed general engineering duties for the city, including procuring design professionals to prepare project construction documents, performing plan check services, initiating construction contract procurement procedures, managing projects to completion, providing analysis of requests for information, change orders, time material verification and project closeout. Projects included building construction and renovation, site designs, integration of private development improvements, heavy and light rail projects, street construction, street improvements, storm drain improvements, underground water and sewer improvements, including coordinating various funding sources, regulatory compliance, and managing the engineering and field staff of the Public Works Department. Doug had an integral part in successful completion of these projects:

Old Town Theater Streetscape Improvement Project - Project management and coordination with the developer to complete the street improvements with the grand opening of the theater
Skate Park Construction Project - Design oversight through construction management and completion
Youth Center Construction Project - Design oversight and review through construction management and completion
Old Town Myrtle Streetscape Improvements - Design oversight and review through construction management and completion. Work coordinated with an active Old Town merchant association
Water and sewer utility projects, mainline replacement, and capital a
Storm water regulatory compliance and program implementation Project Manager I Cities of Montebello and Bell Gardens, CA Douglas was project manager during the design phase and construction manager on numerous successfully completed federally and locally funded street improvement projects, which included complete ADA rarnp improvements at intersections with associated coordination with private property improvements.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqqrtog Services I November 9,2023 37

Aidan Mousavi, MBA, PE, QSP / QSD
Director of Design Services and NPDES Program Manager
Education Experience
M.B.A. General, California State
Lilita Street and Eve Avenue Storm Drain Improvement I City of Lynwood, CA Polytechnic University, Pornona
Project Manager. Conducted a field investigation to identify cause of flooding issue.

B.S. Civil Engineering, California State
Drafted a hydrology and hydraulics report to identify issues and provided two Polytechnic University, Pornona
solutions to alleviate flooding. Developed plans to address flooding through use of drywells and developed alternative plans to direct connect proposed storrn tank to Registrations
existing storrn drain main line.

Professional Civil Engineer:

Connector Pipe Screen (CPS) I City of Bell Gardens, CA
California (#91136)
Project Manager. Conducted a field investigation of all public and private catch basins Qualified SWPPP Practitioner (QSP)
citywide. Developed a CIS based log utilizing MS4Front software. Developed plans / Qualified SWPPP Developer (QSD):
and applied for permitting through LA county to retrofit catch basins citywide by California (#91136)
installing CPS units. Hosted pre -construction meeting with contractor, city staff and LA county.

Gertrude Drive Street Improvements I City of Lynwood, CA Project Manager. Developed plans, specifications and estimate (PS&E) package for water improvement along Gertrude Drive. Designing 8-in D.I.P Water Main complete with tees, service lines, water meters, water boxes, wedge gate valves, transition couplings, thrust blocks, reducers etc. Plans included asphalt and concrete repairs along with plan and profile for curb and gutter drainage.

Virginia Avenue Street Improvements I City of Lynwood, CA Project Manager. Developed PS&E package for water improvement along Virginia Avenue. Designing 8-in D.I.P Water Main complete with tees, service lines, water meters, water boxes, wedge gate valves, transition couplings, thrust blocks, reducers etc. Plans included asphalt and concrete repairs along with plan and profile for curb and gutter drainage.

Asmus Park Catch Basin Evaluation and Feasibility Study I City of Bell Gardens, CA Project Manager. Responsible for alleviating severe flooding issue at Asmus Park by identifying issues through a field investigation and a hydrology and hydraulics analysis to identify volume of water needed to divert and treat. Developed conceptual plans of dry wells at parks to recharge ground water.

Slauson Avenue Congestion Relief Improvement Project I City of Huntington Park, CA
Project Manager. Responsible for hydrology and hydraulics analysis to divert and treat runoff from two-mile long corridor along Slauson Avenue. Designed BMPs to treat runoff and make street into a green street. Ran Synchro Simulation for ten signalized intersections for LOS analysis, coordination and timing. Designed plans and specifications for signal system upgrades and street widening.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqt�g Services I November 9,2023 38

Aidan Mousavi, MBA, PE, QSP / QSD
Director of Design Services and NPDES Program Manager
San Gabriel River Bikeway Environmental Services and Permits I City of Baldwin Park, CA
Engineering Supervisor. Responsible for developing and approving SWPPP so all pollutants and their sources, including sources of sediment associated with construction site erosion and all other activities associated with construction activity were controlled. All discharges were identified and either eliminated, controlled or treated. BMPs selected that were effective and resulted in the reduction or elimination of pollutants in storrnwater discharges. Post -construction BMPs were identified and installed during construction that were intended to reduce or eliminate pollutants after construction was complete. Developed methods to implement BMP inspection, visual monitoring, Rain Even Action Plan (REAP) and Construction Site Monitoring Program (CSMP).

NPDES Storm Water Program Inspection I City of Baldwin Park, CA As required under the state's Regional Water Quality Control Board regulations and city ordinances permitting inspection programs, the City of Baldwin Park enlisted IE to conduct a routine visual inspection for point -source pollution control. The goal of this inspection was to prevent the discharge of pollutants associated with business activities from entering the city's storrn drain system. Aidan conducted all necessary inspections for the City of Baldwin Park and provided the appropriate reports.

NPDES Annual Report I City of Montebello, CA
Project Manager. As mandated by the Trash Total Maximum Daily Loads (TMDLs) for the Los Angeles river watershed, each city within the Los Angeles River watershed is required to submit a compliance report for the Los Angeles River trash TMDL to the Regional Water Quality Control Board. With the collaboration of engineering, code enforcement, building, street maintenance, planning and relevant contracted services, Aidan developed the annual report for the city, identifying methods used to meet compliance as well as providing calculations for scientific justification.

NPDES Storm Water Program Inspection I City of Baldwin Park, CA As required under the state's Regional Water Quality Control Board regulations and city ordinances permitting inspection programs, the City of Baldwin Park enlisted Infrastructure Engineers to conduct a routine visual inspection for point -source pollution control. The goal of this inspection was to prevent the discharge of pollutants associated with business activities from entering the city's storrn drain system. Aidan conducted all necessary inspections for the City of Baldwin Park and provided the appropriate reports.

City Engineering NPDES Services I City of Montebello, CA Project Manager. Managed NPIDES services for the Cities of Montebello and Bell Gardens. Attended various meetings and coordinate with 30+ cities in the same watersheds to reach pollution reduction milestones. Responded to all requests made from the Water Board to client cities. Handled all NPIDES-related work for the city.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginq(ging Services I November 9,2023 39

Aidan Mousavi, MBA, PE, QSP / QSD
Director of Design Services and NPDES Program Manager
Coachella Grow Engineering Services, High Hampton I City of Coachella, CA Designer Engineer. Designed and designated catchment areas on I I -acre lot along with sizing and slope of pipe to divert water. Designed retention basin and dry - wells to intercept runoff from catchment areas with intent to infiltrate the entire site's runoff. Developed hydrology and hydraulics report to summarize findings and method for grading plans and retention basin size per Riverside County and City of Coachella Design Standards. The main objective for this project was designing a cannabis cultivation facility with parking and right-of-way improvements.

Upgrade Water Well No. I Pump Station I City of Bell Gardens, CA Engineering Supervisor. Responsible for hydrology and hydraulics analysis to divert and treat runoff from site. Provided recommendations for pipe size to divert water and BMPs to treat water. Drafted a report to include all analysis and recommendations. Developed a conceptual plan for the water well based on an analysis of required storage volume.

Traffic Signal Improvement at Olive Street and Phelan Avenue Intersection I City of Baldwin Park, CA
Engineering Associate. Aidan prepared a signal warrant study for the intersection of Olive and Phelan per the city's request. After having passed warrant requirements, Aidan had designed proposed improvements to make the intersection signalized.

The improvements included pavement rehabilitation, upgrading ramps to be ADA compliant, striping crosswalks and carnera detection.

ATP Cycle 2, Unprotected Crosswalk Safety Enhancement Improvements I City of Huntington Park, CA
Associate Engineer. The city requested IE to revise and complete the current plans (39 sheets), specifications and estimates which had been prepared by TransTech. The scope included 22 intersection improvements for pedestrian accessibility and safety.

The city also requested IE to obtain E76 for construction since it has only obtained Preliminary Environmental Study (PES) certifications from Caltrans. To complete the E76 process, the Right of Way certifications and request for construction was required before completion, this process took between 6-8 weeks after completion of the 100% PS&E documents.

Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqSing Services I November 9,2023 40

Shawn Mousavi, MSCE, PE, QSP / QSD
Public Works Permit Management and Inspection
Education Experience
M.S. Civil Engineering, California State Slauson Avenue Congestion Relief Improvement Project I City of Huntington Park, Polytechnic University, Pornona CA
B.S. Civil Engineering, California State Engineering Associate. Created traffic signal modification plans for six signalized Polytechnic University, Pornona intersections. Placed video detection equipment, updated cabinets and signal equipment, installed new conduits and conductors, new traffic signal poles at the Registrations intersections and prepared specifications and cost estimate.

Professional Civil Engineer: Traffic Signal Warrant Analysis on Olympic Boulevard and Allston Street California (#91696) Hereford Drive Intersection I City of Montebello, CA QSP / QSD: California (#91696) Supervising Engineer. Responsible for creating the signal warrant report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection and provided a field review of the existing conditions.

Engineering and Traffic Survey I City of Montebello, CA posted speed limits throughout the city. Conducted a field investigation, analyze SWITRS data, create speed survey maps, analyze the speed and traffic data in accordance with the CVC code, and prepare a final report.

Pavement Management System (PMS) Update Report I City of Montebello, CA Supervising Engineer. Responsible for inspecting and creating an inventory of the conditions within the City of Montebello's roadway network. Work included generating excel inventory, creating a GIS map and database, preparing a five-year budget to raise the overall pavernent condition index within the city, and creating a comprehensive report.

All Way Stop Warrants at 6th Street and West Harding Avenue I City of Montebello, CA
Supervising Engineer. Responsible for creating the all -way stop warrant report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, and provided a field review of the existing conditions.

CorridorTraffic Study Along Lincoln Avenue Between Wilcox Avenue and Montebello Boulevard I City of Montebello, CA
Engineering Associate. Prepared a traffic calming report throughout the Lincoln corridor. Analyze the existing peak hour intersection capacity and parking capacity, roundabout design, and determine the future capacity of on -street parking. -'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqStog Services I November 9,2023 41

Shawn Mousavi, MSCE, PE, QSP / QSD
Public Works Permit Management and Inspection
All Way Stop Sign Warrant Analysis 4th Street and Mines Avenue I City of Montebello, CA
Engineering Assistant. Responsible for creating the all -way stop warrant report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection and provided a field review of the existing conditions.

HSIP Cycle 7 Project -Various Intersections Improvements I City of Montebello, CA Engineering Assistant. Upgrade the signal hardware and improve signal timing for the three intersections. This included changing the phase diagram to protective - permissive and relocating existing k-rails to improve traffic flow and safety.

Responsible for the design, specification, and cost estimate of the three traffic signal Beverly Blvd Street Improvements Project I City of Montebello, CA Engineering Assistant. Responsible for preparing plans, specification, and cost estimates. Specific work included detailed field observations, design of necessary street improvements, implementing AC pavement and sidewalk repairs, updating ramps to become ADA compliant and maximizing use of federal funds.

Arroyo Drive Street Improvements I City of Montebello, CA Engineering Assistant. Responsible for developing street cross section and base map; performed field reconnaissance to inspect and verify surface indications of utilities.

Infrastructure Engineers provided design, project management, bidding of contract, construction management and inspection, as well as federal fund administration for this project that involves removal of existing AC paving and paving of AC pavement and concrete improvement reconstruction, including replacing existing curb and gutter, sidewalk, driveway approaches, access ramps, and adjustment of utility covers, traffic striping, markers, pavement markings and curb painting. The project runs from Arroyo Drive from Astra Drive to Rose Glen Ave.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqt�g Services I November 9,2023 42

Mike Bagheri, TE, PE
As -Needed Traffic Engineer
Education
Experience
Master of Public Sector Management
City Traffic Engineer I City of Montebello, CA
Leadership, California State University,
As a member of Infrastructure Engineers, a Bowman company Mike serves as the Northridge
City Traffic Engineer for the City of Montebello. He manages the daily activities of B.S. Civil Engineering, Iowa State
the Traffic Engineering Division. In this capacity, he is responsible for developing University
and managing the annual traffic division budget, securing federal funding from Caltrans for city projects, supervising the design and construction upgrade of the Registrations
new traffic signals, and managing projects for major arterials in the city. In addition, Professional Traffic Engineer:
he is responsible for reviewing traffic signal operations and new system design California (#1663)
projects, overseeing the preparation of PS&E for new traffic signals and striping plans, developing new signal timing, reviewing traffic impact studies and scopes of work Professional Civil Engineer:
prepared by consultants, and plan checking traffic control plans.

California (#47034)
Transportation Manager I City of Pasadena, CA*
Associations
Transportation Manager. Mike planned, organized, and directed the activities Past Metro Sustainability Council
of the City of Pasadena Transportation Planning and Development Division Member
including but not limited to: CIP, Metro Call for Projects, SCAG, and SCAQMD sustainable transportation grant projects, development review process, and VMT Past Metro TDM & Sustainability
/ VT transportation impact analyses using city's transportation forecasting model.

Committee Chair - 2019
Administered city's Trip Reduction Ordinance (TRO), and Transportation Demand Past Metro Transportation Advisory
Management (TDM) plan. Worked closely with the Planning Department and City Committee Member - 2019
Attorney's Office in preparing Draft Environmental Impact Reports (DEIR), and Institute of Transportation Engineers
formulation of traffic -related "response to (DEIR) comments.' Represented the (ITE) member
department at City Council, public meetings, city commissions / committees such as Planning Commission, Design Commission, and Transportation and Environmental Awards
Advisory Commission. Planned and prepared division's budget. 2015 APA Outstanding Transportation Department of Transportation, Bureau of Planning and Land Use Development Planning Project, Measuring Mobility City of Los Angeles, CA* in Pasadena beyond Auto LOS
Transportation Engineer. Mike managed and supervised a team of engineering 2009 APA Planning Excellence for
staff responsible for review of traffic studies/ Environmental Impact Reports (EIRs).

Best Practice, the Next Downtown, a
Participated and interacted with developers and city officials in developing creative Sustainable Vision for Downtown Los
and practical solutions / improvements to mitigate project -related traffic impacts.

Angeles
As point person, Mike coordinated site access and circulation design issues for 100 LAUSD's new schools in the Central, Southern and Hollywood areas with other department bureaus and other city agencies. He also prepared and submitted MTA Call for Project applications, and managed Call projects for LADOT.

Department of Transportation, Bureau of Information Services I City of Los Angeles, CA*
Transportation Engineer. Mike managed and supervised a team of engineering staff responsible for review of traffic studies / EIRs. Headed the Systems Development -'Experience prior to joining the firm and Traffic Surveys Sections responsible for development of Geographic Information Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqtgig Services I November 9,2023 43

Mike Bagheri, TE, PE
As -Needed Traffic Engineer
Systems (GIS)-based applications to streamline department operations. Issued Request for Proposals (RFPs) and managed the department's Traffic Accident Information System (TAIS) project. Secured funds from the Quality and Productivity Commission's Productivity Investment Fund to develop department Work Order Tracking System (WOTS).

Department of Transportation, Bureau of Transportation Planning I City of Los Angeles, CA*
Transportation Engineer. Managed and supervised a team of engineering staff responsible for review of traffic studies / EIRs. Managed and directed staff responsible for collecting, analyzing, and disseminating traffic data in support of the entire department. Planned and implemented a computer system for direct access to traffic data. Converted Section's business process to almost 90% paperless operation. Tested and evaluated new data collection systems for the Section resulting in acquiring more efficient data collection equipment (i.e., Nu -metric and Jaymar). Appointed by the General Manager as the department GIS coordinator. Trained more than 100 DOT staff in using and applying GIS technology in their daily work. In July 1995, prepared a technical report to plan and implement a department wide GIS-based work order system. Conducted departryient-wide MIS / GIS needs assessment survey and convened coordination meetings with representatives of all bureaus in the department.

Department of Transportation, Bureau of Transportation Planning I City of Los Angeles, CA*
Transportation Engineering Associate. Reviewed and analyzed traffic impact studies for new developments in the city to ensure compliance with adopted transportation ordinances and DOT guidelines. Evaluated adequacy of proposed measures to mitigate traffic impacts on the city's transportation system. Worked closely with Council offices.

Department of Transportation, Office of Transportation Operations ® West San Fernando Valley Offices I City of Los Angeles, CA*
Transportation Engineering Associate. Reviewed and approved traffic engineering studies conducted by staff to install, remove, or modify traffic control devices on city streets. Recommended removal and / or installation of signs including parking signs.

Worked closely with City Council offices, LAPD, and other city agencies. Received appreciation plaque from Council District 12 for outstanding work.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqt�g Services I November 9,2023 44

Jose A. Molina
Water Engineer
Education Experience
B.S. Mechanical Engineering, California Infrastructure Engineers, a Bowman company I Brea, CA State University, Los Angeles
Water System Consultant. While employed by IE, Jose has provided the services to the City of Bell Gardens. This includes oversight on the determination of PFAS Certifications
contamination and analysis of an existing water well. Worked on a water quality Grade 5, Water Distribution Operator
improvement engineering study of the city's drinking water system. Assisted with the (State Water Resources Control Board)
selection of the best available technology for PFAS treatment of a water well. Assisted Grade 4, Water Distribution Operator
with the water blending analysis of an existing water well and MWD water for PFAS (State Water Resources Control Board)
treatment. Oversaw the dynamic flow and chemistry profiling of one drinking water well. Oversaw the static and dynamic video carnera survey of one drinking water well.

Oversaw the rehabilitation and modification of one drinking water well. Also, for the City of Glendora, Jose updated the water system cross -connection control program and prepared the city's annual water system report for the State Water Resources Control Board.

Safna Engineering & Consulting I Bermuda Dunes, CA*
Water System Consultant. While consulting for Safna Engineering & Consulting, Jose provided many services to the Los Angeles County Department of Public Works Sativa Los Angeles County Water District. Jose served as the State Certified Chief Operator of Record and managed the daily operations and maintenance of the water system. Directed the operation of pumps, chemical dosage rates for wellhead, distribution residual maintenance, related flow, pressure control and storage facilities by using a System Control and Data Acquisition System (SCADA). Coordinated and oversaw the collection and analysis of various types of water samples from the water system according to procedures provided by the State Water Resources Control Board. Reported and communicated both verbally and in writing with the State Water Resources Control Board pertaining to reporting test results, production data, cross connection control corrective actions, and annual inspection of all facilities.

Prepared and submitted monthly, quarterly, and yearly water quality reports to the State Water Resources Control Board. Ensured compliance with federal, state, and county health and safety regulations. Prepared and oversaw the water system valve exercising program. Prepared and administered the water system flushing program.

Supported the county's team with the water system infrastructure design. Supported the Los Angeles County's team and contractors with the construction of new water mains and repairs of the existing water system. Oversaw the removal, rehabilitation, reinstallation, disinfecting and testing of domestic water wells. Supported the county's team with the construction of new back-up water supplies with adjacent water purveyors. Assisted the county's team with the updating of the water system emergency response plan and emergency chlorination plan. Oversaw the updating of the risk management plan for two chlorine gas systems. Oversaw the conversion of two chlorination gas systems to two sodium hypochlorite chlorination systems.

Assisted with the preparation of the annual consumer confidence report. Oversaw -'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal Enginq�g Services I November 9,2023 45

Jose A. Molina
Water Engineer
the installation of a SCADA. Oversaw the rehabilitation of two hydropneurnatic tanks.

Assisted with the updating of the water system map.

Waterworks Technology, Inc. I Los Angeles, CA*
Water System Consultant. While consulting for Waterworks Technology, Inc., Jose provided many services to the City of Lynwood Water Department. Jose assisted with the operation of pumps, chemical dosage rates for wellhead, distribution residual maintenance, related flow, pressure control and storage facilities by using a SCADA system. Oversaw the removal, rehabilitation, reinstallation, disinfecting and testing of domestic water wells. Supported the city's team and contractors with the construction of new water mains and repairs of the existing water system. Assisted with the preparation of plans and specifications for the rehabilitation of three water wells. Worked as project manager and inspector during the rehabilitation of three water wells. Reviewed plans and specifications for the construction of a new water well. Reviewed plans and specifications for the construction of a well treatment plant for the removal of PCE and TCE. Reviewed plans and specifications for the installation of a new SCADA system.

Utility Services Manager I City of Lynwood, CA*
During his tenure in this position for the City of Lynwood, Jose oversaw the preparation of the Sewer System Master Plan and Sewer System Management Plan.

Planned, organized, and exercised direct supervision over specialized crews and equipment performing preventive and reactive maintenance to the wastewater collection system. Evaluated and managed maintenance programs to ensure efficiencies and quality standards were maximized, including: closed circuit television pipe inspection program, high velocity hydraulic pressure cleaning programs, root removal programs, construction and repair of wastewater manholes and mainlines.

Developed and coordinated ongoing, on the job training, vendor and in-house training for all wastewater work tasks. Reviewed accident hazard reports and recommended corrective action. Oversaw emergency response and cleanup in the event of a sanitary sewer overflow or illicit discharge, documenting investigative findings and reporting to regulatory agencies as required. Evaluated and monitored the status and condition of wastewater infrastructure and equipment, recommending capital replacements and improvements. Reviewed new development plans and specifications for compliance with city's standards. Jose supervised, directed and assigned duties to production personnel. Oversaw personnel activities, assured proper and adequate training, and managed their performance as needed through regular performance evaluations and coaching. Coordinated and oversaw the collection and analysis of various types of water samples from the water system according to procedures provided by the State Water Resources Control Board.

Oversaw the investigation and answering of complaints to customers concerning water quality. Reported and communicated both verbally and in writing with the State Water Resources Control Board pertaining to reporting test results, production Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqStpg Services I November 9,2023 46

Jose A. Molina
Water Engineer
data, cross connection control corrective actions and annual inspection of all facilities.

Oversaw cross -connection control program. Inspected production facilities to ensure compliance with sanitary standards. Oversaw the pulling, resetting, rehabilitation, disinfecting and testing of domestic water wells. Directed the operation of pumps, chemical dosage rates for wellhead, distribution residual maintenance, related flow, pressure control and storage facilities manually or by using a SCADA system. Oversaw troubleshooting, maintenance, and improvements of SCADA system. Prepared specifications and cost estimates for capital improvement projects. Oversaw the design and construction of new water facilities and new treatment facility. Oversaw the preparation of the annual consumer confidence report. Ensured compliance with federal, state, and county health and safety regulations. Prepared budget for the operation, maintenance and capital improvement projects. Oversaw the emergency response team. Coordinated the preparation of design and construction plans with engineering staff. Insured the proper development and administration of work safety programs. Made recommendations on long-range capital improvement projects.

Oversaw the rehabilitation of five water wells and the abandonment of seven water wells. Oversaw the preparation of plans and specifications for the improvement of five water well sites and the installation of five electrical back-up generators. Oversaw the preparation of plans and specifications for the SCADA of the water system.

Oversaw the preparation of Water Master Plans and Water Management Plans.

Oversaw the preparation of the bio-terrorism vulnerability assessment for the water distribution system.

Assistant Director of Public Works / Utility Services I City of Lynwood, CA* Jose administered departmental activities in the absence of the Director of Public Works. Represented the Public Works Department with residents and community groups as it related to the city's water, sewer, street lighting and traffic signal systems.

Provided general administrative, budgetary, engineering and management assistance to the Director of Public Works. Attended City Council meetings and met with the public as needed. Supervised and conferred with the utility division supervisors concerning the planning, scheduling, and assigning of operation, maintenance, repair and construction functions of the water, sewer, street lighting and traffic signal systems. Coordinated the preparation of design and construction plans with engineering staff. Made recommendations on long-range capital improvement projects. Oversaw the development, training and evaluation of unit personnel.

Insured the proper development and administration of work safety programs.

Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqS§ig Services I November 9,2023 47

Jay Shih, PE, CASp
Certified Access Specialist and Entitlement Review
Education
Experience
B.S. Major, Concentration, University or
Certified Access Specialist (CASp) Plans Examiner, Inspector and Instructor I city Institution Name
of Corona, CA
Checks ADA improvement plans for the City of Corona including 36 city parks Registrations
restroorns, handicap parking, and playgrounds. Inspects various existing city facilities Professional Engineer: Virginia
for ADA compliance and make recommendations on required improvements. (#032887), West Virginia (#22353)
Provides inspection and certification for completed improvements, including final Structural Engineer: IL (#032887)
walk-through and punch list creation. Provides design consultation and plan review services, from design through construction documents. Prepares and provides Certifications
appropriate training materials for engineering staff, including major updates to Federal and California ADA codes. Provides technical expertise and expert witness Registration Boards (CLARB)
testimony as needed.

Certification
LEER AP BD+C
Infrastructure Engineers, a Bowman company I Brea, CA
Principal of Building & Safety. Directs and supervises professional and technical Associations
staff; prepares building and engineering proposals in response to RFPs and RFQs; makes hiring and disciplinary decisions; identifies training needs; oversees plan NAIOP (Northern Virgina)
check, permitting, and inspection; negotiates, administers, and monitors contracts Urban Land Institute (ULI)
and agreements. Provides effective leadership with the building and engineering Loudoun County Chamber of
departments to achieve project requirements, meets deadlines, satisfies customer Commerce; Board of Directors (2011 -
and client needs, ensures safe operations, and meets profitability targets. Manages all 2018), Executive Committee (2017-
aspect of building and engineering plan check, building and engineering inspection. 2018)
Provides building standards code, storrnwater, and low impact development training to staff. Checks complex structural, architectural, disabled access, land development, and public improvement plans.

City Engineer I Cities ofArtesia and Baldwin Park, CA
Directed and administered all activities of the Engineering Department, including planning, designing, and directing construction and maintenance of streets, bridges, pipelines, water and sewer systems. Managed capital improvement projects, reviewed designs completed by consultants. Monitor storrnwater discharge from MS4, construction activities, and industrial activities into the city's storm drain system for compliance with NPDES Permit requirements. Reviewed and approved public improvement and land development plans prepared by private engineers, directed counter technicians to issue encroachment permits and grading permits, calculated grading bonds, coordinated inspection and acceptance of such work.

Building Official I Cities of Huntington Park, Montebello and Baldwin Park Provided counter plan check and building code consultation; checked residential and commercial plans, including mechanical, electrical and plumbing; checked grading, drainage, low impact development, erosion control and WQMP plans; reviews soil, compaction, hydrology analyses and SUSMP reports; provided input to Planning -'Experience prior to joining the firm Department in the drafting of Conditional Use Permits; coordinated with City Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqej�g Services I November 9,2023 48

Jay Shih, PE, CASp
Certified Access Specialist and Entitlement Review
Engineers in the review of tentative and final tract maps, parcel maps for lot split, and lot merger in compliance with the Subdivision Map Act.

Building Official and Principal Plan Check Engineer I Cities of Rosemead and La Puente, CA
Provided counter plan check and building code consultation; checked residential and commercial plans, including mechanical, electrical and plumbing; checked grading, drainage, low impact development, erosion control and WQMP plans; reviewed soil, compaction, hydrology analyses and SUSMP reports; provided input to Planning Department in the drafting of Conditional Use Permits; coordinates with City Engineers in the review of tentative and final tract maps, parcel maps for lot split, and lot merger in compliance with the Subdivision Map Act.

Senior Plan Check Engineer I Cities of Baldwin Park and Huntington Park, CA Provided counter plan check and building code consultation for the building departments. Checked residential and commercial plans, including mechanical, electrical and plumbing. checked boundary, topographic, ALTA surveys, grading, drainage, low impact development, erosion control and WQMP plans.

Community Redevelopment Agency I City of Los Angeles, CA* Director of Engineering Department operations in revitalizing blighted communities within the city. Managed the design and construction of Upper 2nd Street Bridge which connects the old downtown Los Angeles with Grand Ave. Oversaw staff construction managers and inspectors in managing construction contracts. Checked tenant improvement, building rehabilitation, and public works improvement plans prepared by staff engineers and consultants prior to advertising and bidding construction projects. Provided construction management services for a new 8,645 SF Community Center. Project includes a kitchen, multipurpose rooms, administration offices, restrooms, game room, concession room, landscaping, irrigation, site walls, site lighting, and paving. The building is utilizing a dual plumbed system, and the site is using reclaimed water for irrigation. The project has required close coordination with SCE, RWQCB, and Los Angeles County Department of Public Health.

Department of Public Works I City of Los Angeles, CA*
Civil Engineer. Designed seismic retrofits to strengthen the city's unreinforced masonry buildings. Managed construction of public improvements including grade separation, bulkheads, trunklines, tilt ups, and wastewater treatment plants. Checked subdivision maps and metes and bounds legal descriptions. Designed retaining walls and concrete bulkheads. Prepared public improvement plans including sidewalks, sewers and storm drains. Performed construction management of public Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqejing Services I November 9,2023 49

Malia Durand
CEQA Manager
Education
B.S. Environmental Science, San Diego
State University
Certifications
Certified Inspector of Sediment and
Erosion Control In -Training (CISEC-IT)
Experience
Infrastructure Engineers, a Bowman company I Brea, CA
Director of Environmental and Planning Services. Malia is one of IE's multi -faceted planners with an innate ability to effectively interact with clients and the public to arrive at positive results when managing projects and staff. 2023-2031 Housing Element Update I City of WaSco, CA
Project Manager. IE was hired to prepare the 2023-2031 Housing Element and associated CEQA Exemption for the City of Wasco. Malia is the Project Manager on this project.
2023-2031 Housing Element Update I City of Shafter, CA
Project Manager. IE was hired to prepare the 2023-2031 Housing Element and the associated CEQA IS / MND for the City of Shafter. Malia is the Project Manager on this project.
2021-2029 Housing Element Update I City of Adelanto, CA Project Manager. IE is providing staffing and technical support for land use and environmental planning projects including the preparation of the 2021-2029 Housing Element and associated CEQA IS / MND for the City of Adelanto. Malia is the Project Manager on this project.
2021-2029 Housing Element Update I City of Lynwood, CA
Project Manager. IE prepared the 2021-2029 Housing Element and the associated CEQA IS / MND for the City of Lynwood. Malia is the Project Manager on this project.

CEQA Consulting Services I City of Norwalk, CA
Project Manager. IE was selected to provide CEQA / Planning Consulting Services to the City of Norwalk by performing peer reviews of various documents pertaining to the Norwalk Entertainment District -Civic Center Specific Plan Project. Malia utilizes her experience with environmental document development and review to serve as the Project Manager and Senior Environmental Planner for this project. IE provided a review of the Environmental Impact Report (EIR) and Specific Plan on behalf of and working closely alongside the city.

County of San Diego Department of Public Works I County ofSan Diego, CA* Land Use and Environmental Planner. Malia was responsible for managing the environmental processing of public works Capital Improvement Projects (CIP), from concept through construction and final mitigation sign -off. Some example projects included road improvements, bridge rehabilitation and construction, flood control facilities, dump rernediation and complex emergency repair projects. Malia was responsible for critical negotiations with local, state, and federal resource agency representatives for all permitting and compensatory mitigation associated with -'Experience prior to joining the firm impacts to sensitive habitat, jurisdictional resources and listed species. Performed Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqe&g Services I November 9,2023 50

Malia Durand
CEQA Manager
environmental code compliance, violation resolution, environmental rernediation and maintained up-to-date knowledge of environmental laws, regulations and policy governing both public and private development. Mafia has extensive experience presenting to rnernbers of the public, stakeholder groups, community planning groups, and representatives of state and federal regulatory agencies. Mafia spearheaded the development of nurnerous technological advances for essential county -wide prograrns, resulting in substantial labor and cost savings.

San Diego Regional Water Quality Control Board, Core Regulatory Unit I Son Diego, CA*
Student Assistant. Provided the tirne management and organizational skills necessary to perforrn multiple complex tasks independently or when working closely with others. Contributed her extensive knowledge and use of the statewide database, CIWQS, as well as a general knowledge and understanding of nurnerous other databases used at the Regional Board. Exhibited resourcefulness and good judgment while evaluating individual projects and reviewing annual municipality submittals.

Technology Associates International Corporation (TAIC) I Son Diego, CA* Biologist. Performed tasks involving environmental, species, habitat, construction and mitigation compliance monitoring. Gained strong environmental law and policy understanding and application in the field and in technical report write-ups.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqej�g Services I November 9,2023 51

Arjan M. Idnani, MSCE
Construction Manager
Education Arjan Idnani worked on major infrastructure projects and on public works M.S. Civil Engineering, California State improvement and rehabilitation projects throughout California. His experience University, San Jose includes work on land development projects, capital improvement projects, construction management, project management, and administration. Arjan's B.S. Civil Engineering, California State experience also includes street improvement projects, water main line replacements, Polytechnic University, Pornona slurry seal improvements, traffic signal improvements, and sanitary sewer improvements in cities of Bell Gardens, Montebello, Baldwin Park, South Gate, and South El Monte.

Experience
Construction of SBI Street Enhancement Project I City of Huntington Park, CA Project Manager. This project consisted of trenching, pipe layout, backfilling, pipe abandonment, pipe lining, demolition of existing improvements, relocation of utilities, construction of concrete improvements like sidewalks, curb and gutters, curb ramps, driveways, cold milling, concrete and asphalt paving, and placement and connection of traffic signal equipment.

Construction of Annual Street Rehabilitation Project Phase 2B I City of Compton, CA
Project Manager. This project consisted of edge milling of existing pavement, 4 in of cold -in -place- recycling (CIR), material testing, 1-1 / 2 in to 2 in asphalt rubber hot rnix (ARHM) overlay, removal and reconstruction of damaged PCC sidewalks, curbs and gutters, cross gutters, local depressions, driveway approaches, added medians, future irrigation conduit installation, ADA curb ramps; utility adjustments, reconnecting existing curb drains, installation of new water meter, traffic loop replacement, replace traffic signing, thermoplastic striping and pavement markings; and traffic control and other associate elements of work.

Construction of Urban Bicycle Project I City of Lynwood, CA Project Manager. This project included the construction of H MA Bike Path, curb and gutters, curb ramps, retaining walls, concrete swales, concrete box culverts, chain link fence, permeable pavers, installation of removable bollards, gates, main waterline, irrigation, install trees and shrubs, mulch, install single and dual ARM Pedestrian, lighting poles and luminaire, furnish and install way finding and interpretive signs, bicycle racks, fountains, and striping.

Construction of Central Park West I City of Baldwin Park, CA Project Manager. This project included the construction of Irrigation System and Landscaping, security lighting system, improvement of park area, construction of restroorn / storage area, installation of storm drain, sewer and domestic water system, construction of playground area and tot lot areas with playground equipment, construction of volleyball and basketball courts and installation of bicycle rack, shade structures, BBQs, picnic tables and drinking fountains. -'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqejAng Services I November 9,2023 52

Arjan M. Idnani, MSCE
Construction Manager
Civil Engineer I City of South El Monte, CA
Arjan operated as a permitting engineer for the city, issuing building permits and conducting Inspections for permits and off -site improvements for buildings and tract maps. He wrote and reviewed RFPs and provided project management staff reports for City Council meetings. Some projects he was involved with included the pool plaster project (including removal of existing plaster, files, and railings and installing new plaster and tiles and railings); skate park construction (including removal of existing curb and gutter, sidewalk, and benches, and construction of curb ant gutter, sidewalk, ramp, drain and trellis); and Farrner Avenue Patch project, which included removal of existing pavement, compacting existing base rock, and installing 4-in asphalt.

Santa Anita Traffic Signal Modification I City of South El Monte, CA Construction Manager. This project included installation of new traffic signal poles, a new equipment cabinet, and a video carnera and removing and replacing access ramps and striping.

Construction Manager I City of Montebello, CA
Bluff Road Improvements. This project included cold milling existing 2-inch- deep asphalt and installing 2-in of asphalt overlay along Bluff Road. In addition, construction of new curbs and gutters, sidewalks, and driveways and access ramps were performed as well as installing traffic loops and striping.

Via Compo Improvements. This project included cold milling existing 3-in- deep asphalt and installing 3-in of asphalt overlay. Also removed and replaced damaged curbs and gutters, sidewalks, and driveways, and installed traffic loops and striped.

Beverly Boulevard Improvements. This federally funded project included cold milling existing 3-in-deep asphalt and installing an overlay of 3-in of asphalt, removing and replacing damaged curbs and gutters, sidewalk, and driveway, and access ramps; pruned trees, installed traffic loops, raised manholes, striped and constructed bus pads.

Flotilla Avenue Improvements. This project included replacement of damaged 12-in clay sewer pipe in several locations as well as cold milling existing 2-in- deep asphalt and installing an overlay of 2 in of asphalt. Removed and replaced damaged curbs and gutters, sidewalk driveways, and access ramps. Raised manholes, installed traffic loops, and striped.

Garfield Avenue Improvements. This project included cold milling existing 3-in- deep asphalt and installing an overlay of 3 in of asphalt, removing, and replacing damaged curbs and gutters, sidewalks, and driveways, and access ramps.

Constructed bus pads, installed traffic loops, and striped.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqejing Services I November 9,2023 53

Arjan M. Idnani, MSCE
Construction Manager
Safe Routes to School. This project included installation of speed signs, lighting crosswalks in pavement, hatched striping of cross walks, and construction of speed bumps and access ramps.

Emergency Vehicle Preemption Project I City of Bell Gardens, CA Construction Manager. Provided construction management and inspection of installation of Opticorn detectors, Opticorn controller equipment, connecting Opticorn controller equipment to Opticorn detectors and removal of the existing conduit and replacement with new conduits. The improvements were conducted at six intersections.

NewTraffic Signal at the Intersection of Garfield Avenue and Madison Avenue City of Montebello, CA
Construction Manager. Provided construction management and inspection for this project that included installation of a new traffic signal at the intersection of Garfield Avenue and Madison Avenue. Work was comprised of all the associated equipment and electrical components (video vehicle detection system, LED systems, cabinets), painting of curb, traffic striping of the roadway, installation of markers and roadway markings, and all other required equipment to ensure the proper and intended operation.

Installation of Bus Shelters I City of Hawaiian Gardens, CA Construction Manager. This project included construction of new bus shelters along Carson Street and Pioneer Boulevard, installation of solar lights, installation of decorative trash cans and benches at new and existing bus stops and painting existing bus stops.

Construction of Ramona Boulevard I City of Baldwin Park, CA Construction Manager. This project included construction of new bus shelters along Carson Street and Pioneer Boulevard, installation of solar lights, installation of decorative trash cans and benches at new and existing bus stops and painting existing bus stops.

Widening of Kauffman Avenue and Dorothy Avenue; Construction of Fireston Median I City of South Gate, CA
Construction Manager. This project included excavation of 10 in of existing street a installing 6 in of aggregate base and 4 in of asphalt. Removed and replaced curbs and gutters, sidewalks, and driveways and constructed access ramps. Also installe streetlights, a new I 2-in water main, water services hydrants, and constructed ne" storm drains and catch basins. Constructed a median island on Firestone Boulevarld and installed an irrigation system and landscaping.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginqej�g Services I November 9,2023 54

Attif Haffar, EIT
Inspector
Education
Attif Haffar has over 30 years of diversified experience in the field of construction B.S. Civil Engineering, University of
inspection, construction management, civil engineering, water resources, and Texas at Arlington
transportation. Attif has worked in the civil design of solar and wind farm projects, master planning for drainage facilities, storm drain, regional detention basins, Registrations
hydrology and hydraulic analysis and water -quality studies, by utilizing LA Metro, Port of Long Beach, and OCTA, Metro link, RCTC, SBCTA, SANDAG and local municipalities.

Engineer -in -Training (EIT): California
Attif has designed urban highways and streets using Caltrans Standard and (#XE080535)
Specifications. He has also performed construction management by establishing the project execution plan, health and safety plan, quality assurance / quality control plan, and construction phase coordination, as well as overseeing the design and resolving various issues.

Experience
Susan Rubio Zocalo Park I Baldwin Park, CA
Inspector. Attif was involved in planning the entire project and documenting all the jobs that must be completed. Located northwest of Baldwin Park City Hall, at the intersection of Pacific and Maine Avenues to Sterling Way, the $11 M park project is supported by $6M from the state budget, secured by state Sen. Susan Rubio, a former city council member in the city.
offilOWN
Inspector. Infrastructure Engineers provided engineering design services for 2.5 miles of a Class I bicycle and pedestrian path project to connect with an existing Class III bicycle route. The entire project is built on rights -of -way either controlled by the City of Baldwin Park, Los Angeles County Department of Public Works, Los Angeles County Flood Control District or Caltrans. The right-of-way was acquired by the city through a land use agreement with the Los Angeles County Department of Public Works and Permits from Caltrans District 7. The design phase of the project included project management and meetings, data collection and record research, utility research and agency coordination, surveying, hydraulic and hydrology analysis, and final plans, specifications and cost estimate (PS&E).

Urban Bicycle Project I Lynwood, CA
This project included construction of HMA bike path, curb and gutters, curb ramps, retaining walls, concrete swales, concrete box culverts, chain link fence, permeable pavers, installation of removable bollards, gates, main waterline, irrigation, install trees and shrubs, mulch, install single and dual ARM pedestrian, lighting poles and luminaire, furnish and install way finding and interpretive signs, bicycle racks, fountains and striping.

Annual Street Rehabilitation Project I Compton, CA
Inspector IE performed in accordance with the plans, specifications and other contract documents and provided the following: construction of cold mill, ARHM -'Experience prior to joining the firm pavement, AC base course, aggregate base, full depth AC slot pavement, curb and Exhlafts�ructure Engineers, a Bowman company I Municipal Enginq�g Services I November 9,2023 55

Attif Haffar, EIT
Inspector
gutters, sidewalks, cross gutter, alley intersection, driveway approach, curb ramps, signing, striping, markings, and pavement legends, speed hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water ureter, and storm drain manhole. The project location was Rosecrans Avenue, Compton Avenue, Slater Avenue and Santa Fe Avenue.

Structural Design Plus, Inc. I Sherman Oaks, CA*
Attif was involved in planning the entire project and documenting all jobs that must be completed. He managed staff and the expenses of the project efficiently throughout the process to ensure that adjustments for unexpected issues were resolved. He inspected pavement by utilizing the City of Hollywood specifications for slurry seal and placement of the asphaltic concrete. He designed and layout of dry utilities (fiber-optic, gas, electric) sewer, box culvert, storm drain, spillway, detention basin, water quality basin, and WQMP, SWPPP, BMP reports for commercial and industrial projects. Utilized Caltrans Standards and Specifications to oversee the inspection, of the Lamp bridge and related structures. Worked in conjunction with construction managers, local officials, and other parties to ensure the project met all safety standards while also accommodating deadlines, budget guidelines and other considerations.

Chapman Construction I Corona, CA*
Inspected and reviewed projects to monitor compliance with standard specifications, safety codes, and other regulations. Scheduled events, programs, and activities as well as the work of others. Used logic and reasoning to identify the strengths and weaknesses of alternative solutions. Considered the relative costs and benefits of potential actions to choose the most appropriate one.

URS Corporation I Los Angeles, CA*
Preliminary and final hydrology reports, using unit hydrograph and routing method.

Preparing WQMP and SWPPP reports for Soda Mountain Solar Project (350-MW solar electric power generating facility) 29,000 acres.

North Spring Bridge over LA River, providing water surface elevations for the proposed and falsework condition for LA River.

South Wilmington Grade Separation (access roads and approaches to the viaduct) Port of LA. Performed drainage and WQMP report, storm drain, sewer, water, and SWPPP plan according to Caltrans standard and specifications.

SR-47 Truck Expressway Study, the project was jointly developed by the Alameda Corridor -East Construction Authority and Caltrans to replace the Schuyler Heim Lift Bridge with an elevated expressway to link Terminal Island with Alameda Street. Using Caltrans standard and specifications Attif was responsible for the storm drain, water pollution control plan, hydraulics analysis for Cerritos Channel and PS&E.

Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqeJtPg Services I November 9,2023 56

Attif Haffar, EIT
Inspector
K&A Engineering I Corona, CA*
Design, plan checks and construction management for water (mainline, pump station), sewer, box culvert, storm drain, spillway, detention basin, water quality basin, and WQMP, SWPPP, BMP reports for residential, commercial and industrial projects. Preliminary and final hydrology reports using rational, unit hydrograph and routing method. Provide quality control and quality assurance so that the project is constructed in accordance with approved plans, specifications, budget and schedule according to Caltrans standard.

CM Engineering I Son Bernardino, CA*
Worked with the key project and construction contractor individuals to monitor action plans to rectify potential construction cost overruns or delays and accommodate significant changes to the scope of work. Advised the client and other team members of any such changes. Atfif's responsibilities were to coordinate with the contracts management and project controls groups and any client subcontractors to maintain current and tirnely change orders according to Caltrans standard and specifications. Participated in negotiations with regulatory agencies and public meetings in support of clients' interests, Identified the needs for specialist resources to create project teams capable of completing effective, quality work. Discussed the qualifications required of the key project positions in specific detail with the senior managers. Collaborated with the office facilities staff to address project space requirements.

Utilizing Caltrans standard and specifications, Attif was in charge of daily personal interactions with clients, designers, owners, contractors, inspectors and authorities having jurisdiction on the project. Attif also promoted technical and commercial excellence on the project through the application of quality assurance processes.

Monitored and reported on the progress of all project activity including significant milestones, and any conditions, which would affect project cost or schedule.

Established weekly meetings to review project status and formulate action items.

Texas State Highway Department I Snyder, TX*
Highway design, plan, profile, drainage facility, pavement, striping, and details.

Monitored contractor's work and progress of construction to ensure compliance with plans, specifications for bridges, infrastructure and highway construction. Measured and recorded pay quantities and prepared daily reports. Issued notices of non- compliance and stop -work orders. Conferred with the contractor, designer, owner, and / or governing authorities to explain the basis for the issuance of the above - referenced notices and to discuss acceptable corrective actions. Material testing, measuring and recorded pay quantities.

Exhlafts�ructure Engineers, a Bowman company I Municipal EnginqeJtng Services I November 9,2023 57

Imad Zureiqat, EIT
Inspector
Education
Irnad Zureiqat has more than 40 years of experience in construction inspection and M.S. Engineering, Moscow Civil
resident engineer tasks. He has been responsible for preparation of plans, cross - Engineering Institute
sections, details, and specifications for various civil and landscape projects. Imad has coordinated with other engineering disciplines, responded to plan check comments, Registrations
and prepared material, take -off and cost estimates.

Engineer -in -Training (EIT), California
Experience
General Building Contractor License
Urban Bicycle Project I City of Lynwood, CA
(B)
This project included construction of HMA bike path, curb and gutters, curb ramps, retaining walls, concrete swales, concrete box culverts, chain link fence, permeable Certifications
pavers, installation of removable bollards, gates, main waterline, irrigation, install Special Inspector Certificates:
trees and shrubs, mulch, install single and dual ARM Pedestrian, lighting poles and luminaire, furnish and install way finding and interpretive signs, bicycle racks, Commercial Building Inspector
fountains and striping.

Structural Masonry
Maine Avenue Improvement Project I City of Baldwin Park, CA Reinforced Concrete
Provided construction inspection of this project. The purpose of the project was Prestressed Concrete Special Inspector
to create neighborhood -friendly pedestrian and bicycle linkages serving the areas Associate
surrounding Maine Avenue. The sidewalks were widened by 2 ft, continuously on ACI Field Technician Grade I
each side of the roadway; parking lanes have curb extensions at intersections and intermittent locations. Utilities were placed underground, and the driveway ramps Division of the State Architect (DSA)
were reconstructed to provide flat sidewalk paths across driveways. Lighting was Regulations & Procedures (Part 1, 11, 111)
improved and included pedestrian -scale lighting every 75 ft. Intersections were improved with new crosswalk markings, signal improvements, ADA Ramps, and a Languages
roundabout at Main Avenue / Olive Street with safety islands for pedestrians and English (native / professional
bicyclists.
proficiency)
Long Beach Boulevard I City of Lynwood, CA
Arabic (native / professional
Provided compliance with plans, specifications, and the contract; oversaw traffic proficiency)
control, and provided daily log and inspection report entries, including pictures Russian (elementary proficiency)
of the project. Reviewed and reported contractor claims, prepared weekly update reports, and reviewed contractor's invoices, verified completed work and approved all quantities. Infrastructure Engineers provided construction management, inspection, and labor compliance that included roadway resurfacing of 192,779 sq. ft. with a section of 2-in AC top course and 1-in AC leveling course and 40,000 sq. ft. with a section of 2-in of asphalt rubber hot rnix (ARHM) over I / 2-in SAMI sealant and 1-in leveling course. Concrete improvements included 4-in sidewalk, driveway approaches, cross gutters, curb and gutter, curb ramps, installation of 16 detectable warning surfaces on existing curb ramps and construction of six new bus pads.

Pacific Pedestrian &Transportation Improvement Project I City of Huntington Park, CA
Provided construction inspection, preparation of daily reports, review of change -'Experience prior to joining the firm orders and progress payment requests, coordinated soils testing service and assisted with labor compliance.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2U�g Services I November 9,2023 58

Imad Zureiqat, EIT
Inspector
Mines Avenue Street Improvements I City of Montebello, CA Construction management and inspection services included construction inspection, preparation of daily reports, review of change orders and progress payment requests, and coordinating soils testing services. The project involved roadway improvements, and pavement rehabilitation with concrete improvements of Frankel Avenue from Bluff Road to Sth Street and 16th Street from Madison Avenue to Harding Avenue.

Home 2 Suites I City of Montebello, CA
Provided construction inspection for this 203-roorn, eight -story hotel. The hotel will be owned by the city and operated by Hilton. The hotel is expected to generate more than $1 M to the city's general fund each year.

City Sanitary Sewer System 20% CCTV Project I City of Montebello, CA Responsible for inspection of this project, including preparation of daily reports, review of change orders and progress payment requests. The project involved televising and rating of the condition of 20% of the city's sanitary sewer system, including possible as -needed cleaning and draining.

Bluff Road Street Improvement I City of Montebello, CA
Infrastructure Engineers was retained by the city to provide design, project management, bidding, award of contract, construction management and inspection of the Bluff Road Street Improvement project from Sycamore Street to Date Street (AS rn I I e).

Maple Ave Street Improvements I City of Montebello, CA
Provided construction inspection of this roadway improvement project. Infrastructure Engineers prepared plans, specifications and estimates for roadway improvements, pavement rehabilitation, concrete improvements, ADA improvements and utility adjustments of Maple Avenue from Washington Boulevard to Mines Avenue.The pavement analysis and alternate rehabilitation strategies included budget analysis to complete as much of the street improvements within the fixed project budget.

Bicknell Park Pump Station Project I City of Montebello, CA Infrastructure Engineers provided project management, bidding, award of contract, construction management and inspection for the construction phase of Bicknell Park pump station. Responsible for construction inspection, preparation of daily reports, review of change orders and progress payment requests.

Citywide Safety Enhancement - Active Transportation Plan (ATP) I City of Bell Gardens, CA
Responsible for inspection of this project, including preparation of daily reports, review of change orders and progress payment requests. The project area was comprised of the entire City of Bell Gardens. One of the goals of this project was to create a bike -friendly environment; to encourage residents, especially students, to bike to their destinations. The proposed work at various locations included installing Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2Uing Services I November 9,2023 59

Imad Zureiqat, EIT
Inspector
video cameras at several intersections, installing Americans with Disabilities Act (ADA)-corripliant ramps, countdown pedestrian heads, and bike lane signing and striping on some city streets that met minimum qualification for a bike lane.

Golden State Water Company I Carson, CA*
Prepared fire flow requests, invoices, plan checks, meter service record cards and filing.

West Valley Investment Group I Tarzana, CA*
Supervised construction and safety in seismic retrofit project in Santa Monica Parking Structure 5. Monitored excavations, poured concrete for foundations of piers at UCLA tower cooling building.

Minco Construction I Harbor City, CA*
Followed up construction and safety project at Compton College Stadium renovation; coordinated and managed subcontractors; conducted weekly construction meetings; prepared RFI, PCO, payment progress, purchase orders, as -built drawings and take -off.

Pence Engineering I Irvine, CA*
Prepared plans, cross -sections, details, and specifications for various civil and landscape projects. Coordinated with other engineering disciplines, responded to plan check comments. Prepared material, take -off and cost estimates.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2oing Services I November 9,2023 60

Christopher Ley, PE
Senior Civil Engineer
Education Christopher Ley has over 15 years design and engineering experience. His expertise B.S. Civil Engineering, Oregon State includes CAD and graphic design, civil engineering design including street layout, University hydrology, drainage, sewer design and grading for residential and commercial projects.

Registrations Experience
Professional Civil Engineer: Walden and Associates I Irvine, CA* California (#80620) Project Engineer. Christopher was responsible for civil engineering design including street layout, hydrology, drainage, sewer design and grading for residential and commercial projects. Skilled in developing plans and survey data sets using AutoCAD Civil 3D 2012 and 2016. Production of reports using Microsoft Word and Excel, Bentley WaterCAD, and Bluebearn.

WWD / L&S Engineering I Monterey, CA*
Staff Engineer / CAD Manager. Responsible for civil engineering design including street layout, hydrology, drainage, sewer design and grading for residential and commercial projects. Skilled in developing plans and survey data sets using AutoCAD Land Desktop 2006 and AutoCAD Civil 3D 2011. Responsible for company's migration from Land Desktop 2006 to Civil 3D 2011. Subsequent duties as CAD Manager, responsible for all training in Civil 3D after initial off -site classes, development of comprehensive styles and description key sets, and implementing transitions to Civil 3D standards from Land Desktop. Also developed training aids and curriculum for transition. Responsible for conversion of Civil 3D files for Revit.

Administrative assistant duties during slow periods, including accounting, filing and office development. IT duties when necessary, including rebuilding network after incomplete implementation by consultant. WWD became L&S in August 2012.

Saroyan Masterbuilders I Sand City, CA*
CAD Manager / Senior Draftsman. Responsible for residential and commercial design and drafting while ensuring ADA compliance, egress requirements and coordination of plans from various disciplines into a single set. Was responsible for implementation of AutoCAD 2006 system, training of 2 supervisors, development of CAD standards and overseeing transition from hand drafting.

Greenway Design I Marina, CA*
Drafting and Engineering Manager. Residential design and drafting including determination of code compliance for lateral stability and egress. Extensive experience with Microstation V8 and Triforrna production drafting of residential structures, including application of engineering notes.

Lin al Cedar Homes, Inc. I Seattle, WA*
Senior Draftsman. Responsible for residential design and drafting, including determination of code compliance for lateral stability and egress. Instrumental in -'Experience prior tojoining the firm creating structural designs of posts and beams for a variety of vertical and lateral Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2U�g Services I November 9,2023 61

Christopher Ley, PE
Senior Civil Engineer
loads. Pioneered development of various charts as aids in design of structural elements. Directly involved in the implementation of Microstation Triforma 3D, and developed methods of aligning non -planar elements that were subsequently used by Microstation in their official training programs.

Baker Engineers, Inc. I Lynwood, WA*
Staff Engineer. Duties included structural design including wind and seismic analysis, gravity design, rigid frarne foundation design and pin pile foundation design.

Production and structural detail drawings and drafting foundation plans.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2UAng Services I November 9,2023 62

Amir Farahani, TE, PE
Senior Traffic Engineer
Education Amir Farahani has more than 30 years of experience in various traffic, transportation B.S. Civil Engineering, California State
and civil engineering disciplines. He has experience with contract administration, University, Los Angeles
design experience and regulatory compliance. He has worked with Infrastructure Engineers, a Bowman company for the past two years as a Principal Engineer. He Registrations
has been in charge of various traffic and transportation studies; design of traffic signals, high -intensity activated crosswalk (HAWK) signals and Rectangular Rapid Professional Traffic Engineer:

Flashing Beacon (RRFB) for pedestrian crossings. In working with the City of Orange, California (#T2363)
as an Engineering Tech. 11 and eventually as a City Traffic Engineer /Traffic and Professional Civil Engineer:

Transportation Manager, he has been involved in all aspects of the projects the city California (#C54235)
has designed and constructed. This includes coordinating with local, county, state, and federal agencies and various utilities to ensure successful project completion.

Arnir understands the level of detail and problern-solving skills required to complete high -profile projects on time and within budget.

Experience
Slauson Avenue Congestion Relief Improvements Project I City of Huntington Park, CA
Project Manager. Conducting traffic signal left turn phasing for five intersections in the project limits and recommending protected permissive left turn phasing with flashing yellow left turn arrow. Designed the subject traffic signals accordingly and prepared PS&E.

ATP Cycle V-Safe Routes and Childhood Obesity Project I City of Huntington Park, CA
Project Manager. In charge of various traffic related works such as design of HAWK beacon system for three pedestrian crossings; design of pedestrian scramble crosswalk striping; traffic signal modifications to create a separate pedestrian scramble cycle; restriping of existing crosswalks with a high -visibility continental design; realignment of existing crosswalks to align with the proposed conversion of Hood Avenue into a one-way street and prepared the project PS&E.

Imperial HWY and Ruth Avenue Traffic Signal Improvements Project I City of Lynwood, CA
The work to be done in general, consists of, but is not limited to the following:
mobilization, traffic control, remove existing crosswalks, warning lights, and streetlights; removal and construction of concrete sidewalks, curb and gutters, curb ramps; furnish and install traffic signal system, battery backup system, pull boxes, traffic signal loop detectors and connect DLC to pull box, relocate fire hydrant and water valve, providing construction survey, and traffic signing, striping and markings as shown on the plans and noted in these special provisions. -'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2uing Services I November 9,2023 63

� ° �� N= ° ~�� ���
�mN���� m-Nm��hNN�����x m m~x m—m~Senior Traffic Engineer Senior Traffic Engineer / Manager -Transportation Services /City Traffic Engineer | City ufOrange, CA*
Amirutilized his many years ofexperience tomanage various traffic and civil engineering projects. He also managed traffic and civil construction projects during his employment with the City ofOrange. Amnir planned, managed, and provided oversight of the daily functions, operations and activities of traffic and transportation division of the City of Orange, including Traffic Management Center (TMC), traffic signal timing, operation and maintenance, review of residential and commercial developments; and was responsible for leading the traffic operation and transportation planning team. Amniralso managed and participated in the development and implementation ofgoals, objectives, policies and priorities for the division. Healso provided recommendations within departmental policy regarding appropriate service and staffing levels.

Oversaw and participated imthe development and administration ofthe operation and capital improvement division annual budget; participated imthe forecast of funds needed for staffing, equipment, materials, and supplies; monitored and approved expenditures; implemented adjustments. Attended and participated as CityTraffic Engineer at city council, commissions, committees, and other agency meetings asrequired. Prepared and presented technical information, analysis, and recommendations. Oversaw the development ofconsultant requests for proposals for professional and construction services and the advertising and bid processes; evaluated proposals and recommended project award; administered contracts after Collaborated with other city departments, police, fire, [altrans,O[TAand other outside agencies toplan, implement and complete projects and initiatives toimprove traffic safety and mobility around the city. Identified outside funding sources for city traffic and transportation programs, directed and prepared funding applications.

Responded to traffic and transportation related resident and commuters' inquiries and requests. Oversaw traffic signal plans preparation and coordination programs, developed and approved traffic engineering standards and policies for the city.

Reviewed and analyzed studies, environmental impact reports, proposals, and negotiations with other agencies tosecure projects and policies favorable tothe city.

Senior Civil Engineer /Associate Civil Engineer /Assistant Civil Engineer Engineering Tech. H|City ufOrange, CA*
Planned, prioritized, assigned, supervised, reviewed and participated imthe work of staff responsible for providing traffic engineering services within the assigned section. Developed and prepared construction plans, specifications, and estimates for various in-house design projects including traffic, streets, sewers and storm drains.

Participated in the selection of engineering staff; provided or coordinated staff training; worked with employees tocorrect deficiencies; implemented ctueEngineers, aBowman company | Municipal Engin2g�pgServices | November 9,2CQ] 64

Amir Farahani, TE, PE
Senior Traffic Engineer
discipline procedures. Reviewed and prepared transportation and traffic engineering studies; prepared requests for proposals; reviewed environmental impact reports; reviewed transportation models. Performed project management for the design and construction of capital improvement projects for city departments including public works, community services, economic development and fire. Ensured conformance with state, federal, and local standards and procedures in carrying out projects.

Prepared and applied for project funding from federal, state, and utility grant programs including Highway Bridges Rehabilitation and Replacement (HBRR), Arterial Highway Rehabilitation Program (AHRP), Safe Route to Schools (SR2S / SRTS), Highway Safety Improvement Program (HSIP), Transportation Enhancement Activities (TEA), Orange County Sanitation District Cooperative Projects, State -Local Transportation Partnership Program (SLTPP), Community Development Block Grant (CDBG) and City Engineers Flood Control Advisory Committee (CEFCAQ.

Interacted and communicated with the public, city management and departments, contractors, consultants and other governmental agencies to resolve issues.

Prepared and processed various documents including council agenda reports, consultant agreements, hydrology and hydraulic studies, requests for proposals, plan check, consultant selection, bid evaluation, insurance certificates, environmental compliance, encroachment permits, right-of-way and reimbursement packages.

Revised and maintained city standard plans and specifications.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2&g Services I November 9,2023 65

Charlie Marr, PE
Water Engineer
Education
Charlie Marr is Principal Civil Engineer with engineering and management B.S. Civil Engineering (Environmental
experience in water and sewer systems master planning and design, including Emphasis), California Polytechnic State
hydraulic modeling, and water resources analysis in support of pump station and University, Pomona, 1987
pipeline design, and creative solutions to sewer service that may not be conducive with standard operation. The master plans for domestic water, wastewater, and Registrations
nondornestic water systems performed for cities; large residential, industrial, and commercial developments; and university campuses state-wide typically include Professional Civil Engineer:
preparation of capital improvement programs identifying future facilities and sizing California (#53435)
to accommodate proposed infill and service area expansion. Master planning and hydraulic modeling are key tasks for preliminary design of both water and sewer Associations
piping and pumping systems to determine optimal pipe diameter, and pumping Associate Member, American Society
system curves for reliable and efficient operation.
of Civil Engineers (ASCE), Metro LA
Branch
Experience
American Water Works Association
Avalon Tract 36649 Water and Sewer Calculations I Jurupa Valley, CA (AWWA)
Prepared water and sewer flow estimates and hydraulic analysis. The water and sewer purveyor for the Project site is Rubidoux Community Service District who conditioned Orange County Water Association
the analysis in order to confirm the capacity of their existing systems to serve the (OCWA), past member
Project. RCSD Water and Sanitary Sewer Systems Design and Construction manual Water Emergency Response of Orange
dictating operating parameters to verify with the completion of the proposed project County, Engineering Advisor, past
and full occupancy. The Manual was used for estimating average and peak water, member
as well as procedures for evaluating system operation. For the water system that meant maintaining minimum pressures and maximum velocities. For sewer, it was determined that depth ratio increase was negligible.

MCRV Sewer Service Evaluation I Houston, TX
Assisted on a development project for Houston Medical Center RV Resort. Utility service challenges stemmed from a remote location for this medical facility designed for recovering hospital patients, and a scheduling misunderstanding for a sewer main line construction. The sewer would not be constructed for at least a year following patient move -ins to the Resort. Blue Mountain Development assembled a team of experts to help coordinate approvals for a temporary pump -to -haul operation, which required compliance with additional regulations associated with hauling medical wastewater. Provided technical guidance for collection system, wastewater storage, pumping capacity, and service frequency schedule. This allowed Resort operation until the sewer main could be constructed and implemented for permanent service.

LaPal ma Master Plan Update I La Palma, CA
Recently completed La Palma's 2020 WSMP Update. Prior to this, prepared the City's Sewer Master Plan and SSMP, complete with a NASSCO-certified condition assessment specialist for identifying and prioritizing all defects found for a major portion of the city's system. The updated sewer reports included hydraulic analysis -' and focused on updating the CIP and required SECAP of the SSMP. As a result of the Experience prior to the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2utpg Services I November 9,2023 66

Charlie Marr, PE
Water Engineer
detailed studies, the city has been compliant with the WDR and SSMP requirements.

Well No. I Site Improvements I Bell Gardens, CA
Preparing preliminary design and final design for the city's well site improvements project as an applicant for State Water Resources Control Board funding to improve its water supply system and maximize its use of local water supplies. New facilities include Treatment vessels for controlling PFAS conta rn I nation, 1.2 MG steel storage reservoir, and booster pump station. The project team solicited the expertise of RC Slade and Associates, renowned groundwater and well planning specialists, to provide opinion regarding feasibility of drilling a second well within the project site.

Appurtenances include (1) on -site piping and valving; (2) booster pumping with variable -speed to control flow for the closed system operation; (3) modifications to existing well operation; (4) 1 million gallons of on -site storage; (5) new chlorine injection / analyzers; and (6) SCADA offices. The PDR phase is complete and final design was underway until PFAS contamination was discovered requiring the addition of pressure vessels (GAC or Ion -Exchange).

Pico Apartment Building Rehabilitation I Pico Rivera, CA* Assisted in resolving a sewer service challenge for a 79-unit apartment complex which was undergoing a complete rehabilitation. The rehab project exposed sewer issues that required a complete overhaul of the service concept, including off -site collection to, and utilization of, a recently decommissioned LACSD trunk sewer.

Assisted in the presentation of these alternatives, and ultimately improved sewer service for the entire project.

Golden Oaks Senior Living I Whittier, CA*
Evaluated the public sewer system and capacity to serve a new senior living facility.

The review was critical for obtaining city approvals to connect to the existing sewer system that was thought to be at capacity. Key demonstrating existing capacity was the extended flow monitoring operation performed by a flow monitoring contractor (US Cubed). Determined that existing flows were within acceptable operating depth ratios, and that the addition of flows from the new residential development would continue operating at acceptable depths.

Tournament Hill Sewer Analysis I Beaumont, CA*
Prepared a sewer analysis for a potentially undersized trunk sewer to be utilized by the proposed Tournament Hills residential project (Project). The trunk sewer system serves hundreds of acres of exiting development and is proposed to serve a separate development within the same sewershed as the TH project. The team coordinated with the sewer purveyor (City of Beaumont) to understand the'design' boundaries of the sewershed, estimate sewer volume and peak flows, evaluate record drawings of the sewer, and make a determination of its capacity to serve the Project. The study resulted in options that could be implemented, including monitoring of flows during Project development move -ins and acceptable design procedures for a sewer Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2utpg Services I November 9,2023 67

Charlie Marr, PE
Water Engineer
anticipated to flow full during wet weather. Inflow and Infiltration (I&I) can be very unpredictable, but can be minimized if designed for.

Wastewater Recycling Plant and Recycled Water Use I Coronado, CA* Part of a Civil Engineering team to update a feasibility study prepared for a high profile wastewater reclamation and reuse facility on the Coronado Golf Course. This high profile project is a result of the conditions caused by five years of drought and limited watering allowance, and to develop a more reliable water supply for irrigation. city and golf course officials authorized an in-depth study to update their 2011 feasibility study and prepare bridging documents to pave the way for procuring a design -build (D-B) team. The study proposed to include (1) feasibility study update; (2) engineering report preparation for the Waste Discharge Requirements; (3) public outreach and workshops; (4) funding opportunities; (5) CEQA, CA Water Code and AWWA WateReuse compliance; and (6) D-B team solicitation and procurement.

The Foundry I Redondo Beach, CA*
Teamed with Blue Mountain Development to re -direct sewer flows from an old metal working operation site to a more appropriate sewer system conditioned by the City of Redondo Beach. The site was under re-developrnent from an industrial land use site to a high -end multi residential development. Existing severing from the old metal- working operation included a problematic siphon that required frequent flushing to minimize odor issues. By converting the sewer system as part of the redevelopment project, the city was able to remove a "hotspot" maintenance issue from their O&M program. The recommended sewer system had to be pumped from a central pumping facility on -site to a different location within the public system, which was accomplished using a private gravity flow system to a low-pressure pumping station and discharge system pre -fabricated by E-One.

Exhlafts�ructure Engineers, a Bowman company I Municipal EnginVr�g Services I November 9,2023 68

Nathan Kirby
Administrative Support
Education Most of Nathan Kirby's career has been spent in service to municipalities in Los Business Administration, Cypress Angeles County. He has held positions in which he has been responsible for College, Cypress, CA administrative duties related to public works projects, construction and quality control.

Experience
Complete Street Improvements on Maine Avenue Project I City of Baldwin Park, CA Served as project assistant. Scope of work included removal and replacement of sidewalk, curb and gutter, driveway approach, catch basins, and manholes, rain garden, landscape, new pavement, which included manhole adjusting and streetlight system. Responsible for preparations and / or organization of all construction documents including Contract Change Orders, Meeting Agendas, Progress Payments, Project Budgets, BFI's, Right of Way Maps, Daily Reports and Weekly Statements.

Garfield Avenue Improvements Project I City of Bell Gardens, CA Served as project assistant. Scope of work included removal and replacement of sidewalk, curb and gutter, traffic loops, regulatory signs, curb ramps, and new pavement, which included manhole and valve adjusting. Responsible for preparations and / or organization of all construction documents including Contract Change Orders, Meeting Agendas, Progress Payments, Project Budgets, BFI's, Right of Way Maps, Daily Reports and Weekly Statements.

ATP Cycle 2 Uncontrolled Crosswalk Pedestrian Safety Enhancements Improvements Project I City of Huntington Park, CA
Served as project assistant. Scope of work included removal and replacement of traffic signal systems, vehicle and pedestrian heads, cabinets, controllers, pedestrian push buttons, curb and gutter, curb ramps, flashing beacon, HAWK signal, street name signs, traffic striping and tree removal. Responsible for preparations and / or organization of all construction documents including Contract Change Orders, Meeting Agendas, Progress Payments, Project Budgets, BFI's, Right of Way Maps, Daily Reports and Weekly Statements.

Water Main Replacement Project I City of Huntington Park, CA Served as project assistant. Scope of work included removal and replacement of concrete sidewalk, curb and gutter, driveway approaches, curb ramps, 8-in and I 0-in water main line, water meters, water service lines, tree pruning, and new pavement, which included manhole and valve adjusting. Responsible for preparations and / or organization of all construction documents including Contract Change Orders, Meeting Agendas, Progress Payments, Project Budgets, BFI's, Right of Way Maps, Daily Reports and Weekly Statements.
-'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal EnginDring Services I November 9,2023 69

Cali Hildebrand
Public Outreach Specialist
Education
B.S. Geography, California State
University, Fullerton
Certifications
Geographic Information System (GIS)
Cali is a highly motivated, self -motivated, detail -oriented self-starter with high proficiency in various disciplines and four years of experience. Cali has a B.S. in Geography, a certificate in GIS, experience with ArcGIS, Microsoft Office Suite, Google Suite, Canva, digital and print marketing, website management, quality assurance, research and more. Cali's unique skill -set makes her a valuable member of our team.

Experience
Infrastructure Engineers, a Bowman company I Brea, CA
Planning Technician. Under general supervision of internal senior staff, provides a variety of essential planning, CIS and marketing functions. Cali provides technical assistance and information to internal staff on projects, the public, performs technical work involving customer service; review of applications and plans for completeness and compliance and performs other related work as necessary. Cali provides assistance to staff planners, as needed and serves as the project's primary Planning Technician on -call. Under the general supervision of the Planning Manager and CIS Analyst, Cali also provides technical and support assistance in the development and implementation of Planning Division activities and CIS Support Services. These activities include but are not limited to providing land use and planning information assistance to various project teams; performs and provides CIS computer application support to the CIS Analyst to various project teams; and is vested in learning through hands on training, project tasks and mentoring by senior level staff.

Marketing Coordinator. Cali drove the creation and maintenance of the company's internal social media calendar. She created and scheduled content for the following social media platforms: Instagrarn, Facebook, Twitter, TikTok, Linkedin, Pinterest, etc. Worked collaboratively with designers in the ideation and execution of visual content. Assisted in communications and developing and implementing social campaigns with ambassadors and influencers. Daily interactions with the social media community by responding to messages, comments and drive engagement.

XYZ Printing, Inc. I Anaheim, CA*
Marketing Assistant. Assisted in the everyday operations of the company's social media accounts by developing daily social media content and scheduled posts to coincide with target audience usage. Implemented strategies to expand brand recognition in the 3D printing industry. Provided outstanding service to new and existing customers by focusing on customer concerns and developing solutions via phone and email. Increased customer base by collaborating with content creators and promoting products through giveaways, product content and promotional sales.

Researched competitor services and trends for analysis of marketing strategies. -'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal EnginDring Services I November 9,2023 70

Shawnt Babakhanian
QAIQCEngineer
Education Shawnt Babakhanian has 30 years of experience in the preparation of contract AutoCAD, Glendale College
drawings for a variety of civil engineering, transportation engineering and structural engineering projects. He also has extensive knowledge and expertise in both IT and AutoCAD Civil 3D, Westech College
CARD management.

Microstation, Westech College
Experience
Land Development Desktop, Westech
Bartlett Avenue Rehabilitation Project I City ofAdelanto, CA College
CADD Manager. Responsible for overseeing the project's drafting, design, cost estimates, and specifications for improvements to the asphalt pavement, cross gutter, ADA curb ramps, and water main replacement. The project was not only completed according to the client's requirements but also finished on schedule and well within the budget. In addition, oversaw drafting quality assurance and quality control to meet the standards and requirements set forth by the City of Adelanto.

Bell -flower Street Rehabilitation Project I City ofAdelanto, CA CARD Manager. Improvements to the asphalt pavement, cross gutter, ADA curb ramps, and water main replacement. Responsible for reviewing the project's specifications and cost projections, as well as the design and drafting. In addition, responsible for drafting quality assurance and quality control to meet the standards and requirements set forth by the City of Adelanto.

SBI Street Enhancement Project I City of Huntington Park, CA Designer / Drafter. Sanitary sewer, water, and street improvement plans, including plan and profile, cross -sections, construction details, utility, and traffic striping plans.

Was also involved in preparing specifications and cost estimate for the project, which required the replacement of the old sanitary sewer and water system with a newer system that was up to standards. In addition, was responsible for quality assurance quality control for drafting of civil plans during the project.

Water Main Replacement Project I City of Huntington Park, CA Designer/ Drafter. Main water line, fire hydrants, water meters, and backflow prevention element of the project. Also in charge of the field investigation, specifications, and cost estimate. In addition, was responsible for quality assurance / quality control for project plans and details during the project. The project was completed per standard details, on time, and within budget.

Various Residential Street Improvements (IFY 20-21)1 City of Hawaiian Gardens, CA Designer / Drafter. Street improvements, signing and striping, and utility plans. In addition, was involved in design, specifications and cost estimates preparation.

Responsible for quality assurance / quality control for project plans and details to ensure the project was completed while adhering to city requirements. The project was completed on time and within budget.
-'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal EnginVr�g Services I November 9,2023 71

Shawnt Babakhanian
QAIQCEngineer
Schmidt Road Street Improvement Project I City of El Monte, CA Designer / Drafter. Street improvements, signing and striping plans. In addition, was involved in specifications and cost estimates preparation. He was responsible for quality assurance / quality control for project plans and details to ensure the project was completed while adhering to city requirements. The project was completed on time and within budget.

Alley Improvement, Various Street Rehabilitations and Water Main Replacement Project I City of Brea, CA
Designer / Drafter / Utility Coordinator. Responsible for designing / drafting alley pavement, longitudinal gutter, street improvements, signing and striping and utility improvements within the project area. In charge of drafting the main water line system, fire hydrants, fire services, water meters and backflow prevention for the project. Also, responsible for acquiring and verifying utility plans by coordinating with utility agencies. Shawnt oversaw quality control for the project to ensure that it was completed while observing city requirements.

Alley and Industrial Street Rehabilitation Project I City of Brea, CA Designer / Drafter. Responsible for the preparation of plans, profiles, and details, and involved with the field investigation that included field surveys of the asphalt pavement, sidewalks, curbs and gutters, driveways, and curb ramps. Also involved in specifications and cost estimate preparation. Responsible for quality assurance / quality control for the project's plans and details to ensure that the project was completed while adhering to city requirements. The project was completed on time and within budget.

Lincoln Park Improvement I City ofAnaheim, CA
Designer / Drafter. Project included construction of roadway improvements, including removal of existing improvements including AC pavement, concrete sidewalk, curbs and gutters, storm drain improvements and landscaping, and construction of new street and sidewalk improvements, including new concrete curb and gutter, concrete sidewalk, storm drain catch basins, drainage inlet modifications and AC pavement sections. In addition, was responsible for quality assurance / quality control for drafting of civil plans during the project.

Safe Routes to School - Pleasant View, Vineland and Tracy Elementary Schools City of Baldwin Park, CA
Designer / Drafter. Preparation of PS&E for new signing and striping, curb extensions, new curb and gutter, sidewalks, ADA-cornphant ramps, and pavement. Other improvements include the installation of detectable warning surfaces. The project consists of work on nine intersections.

Exhlafts�ructure Engineers, a Bowman company I Municipal EnginDrAng Services I November 9,2023 72

Jason Wasmund, MURP
Planner I//
Education Jason Wasmund has over 20 years of experience in current and advance planning Master of Urban and Regional
including General Plan Amendments, Housing Element Updates, architectural Planning, University of California,
design reviews, historic preservation planning, and extensive high level entitlement Irvine
processing. Having spent nearly his entire career working for cities in Southern California, Jason is an expert in urban land use planning. He has led the development B.S. Environmental Policy, Analysis and
of significant portions of housing elements, processed annexations and code Planning, University of California, Davis
amendments, managed the designation of numerous landmarks, and managed a variety of commercial and residential development projects including general Affiliations
plan amendments, zone changes, planned unit developments, and conditional use American Planning Association (APA)
permits. Jason is proficient in Accessory Dwelling Unit (ADU) application processing member
and oversees the processing of Commercial Cannabis Program applications.

Experience
Planner Ill. Jason provides support services on current and advanced planning projects including Housing Element Updates, Environmental Justice Elements, Public Safety Element Updates, Specific Plan Amendments and associated CEQA documents.

As a planner, Jason is well -versed in entitlement processing, the preparation of staff reports, resolutions, and ordinances; has extensive planning counter experience, and assists with public outreach activities such as scoping meetings, workshops, charrettes and popup events.
2023-2031 Housing Element Update I City of WaSco, CA
Senior Planner. IE has been selected to prepare the 2023-2031 Housing Element for the City of Wasco. Jason is the lead urban planner in the development of the 6th Cycle Housing Element, under Malia Durand's direction. Jason has contributed to the research and composition on this project, leading the development of the constraints, previous element review and programs sections.
2023-2031 Housing Element Update I City of Shafter, CA
Senior Planner. IE has been selected to prepare the 2023-2031 Housing Element for the City of Shafter. Jason is the lead urban planner in the development of the Housing Element, under Malia Durand's direction. Jason has contributed to the research and composition on this project, leading the development of the constraints, previous element review, and programs sections.

Senior Planner I City of Norco, CA
Jason provided staff augmentation to the City of Norco. Jason served the city as a part-time Senior Planner on an interim basis, provided on -site support services, completed housing element annual reports and processed an annexation to the city.

Senior Planner I City of Moreno Valley, CA
Jason recently provided remote planning services to the City of Moreno Valley on an -'Experience prior to joining the firm interim part-time basis. He performed plan checks and reviewed tentative tract map Exhlafts�ructure Engineers, a Bowman company I Municipal EnginDring Services I November 9,2023 73

Jason Wasmund, MURP
Planner I//
applications for planned unit development involving a general plan amendment zone change for the city.
2021-2029 Housing Element Update I City of Adelanto, CA Senior Planner. Jason is the lead urban planner assisting with the development of the City of Adelanto's Housing Element, under Malia Durand's direction.

Senior Planner I City of Adelanto, CA
As part of IE's Planning Support and Staff Augmentation Services contract with the City of Adelanto, Jason provided on -site support services to the city on current and advance planning projects and CEQA compliance. Jason managed the daily planning functions including assigning plan checks, managing the current projects list, managing major current planning projects, coordinating reports to the City Manager and providing direction to / supporting the professional development of planning staff.

Senior Planner I City of Huntington Park, CA
On behalf of IE, Jason provided staff augmentation services to the City of Huntington Park on a full-time interim basis on major current planning projects, policy development and CEQA compliance.

Associate Planner I City of Corona, CA
Jason completed a I 2-rnonth assignment at the City of Corona as the exclusive planner assigned to process over fifty Commercial Cannabis Program application packets, developing review processes, identifying and proposing solutions to application review issues and providing strong customer service to initiate a successful commercial cannabis permit program. His processing skills and knowledge resulted in the successful completion of his service.

Design & Historic Preservation Section I City of Pasadena, CA* Assistant Planner. Extensive background in design and historic preservation planning, including entitlement processing, preparation of staff reports and public hearings.

Jason participated in the designation of numerous landmarks, National Register nominations, design review of commercial buildings and multi-farnily residential development, numerous Certificates of Appropriateness and implementation of a master development plan.

Department of Planning and Redevelopment I City of Glendora, CA* Assistant Planner. Extensive background in current planning, entitlement processing, regular counter assistance, research and preparation of staff reports, and public hearings before the Planning Commission and City Council. Projects included entitlement processing for new commercial buildings and additions; multi-farnfly residential developments; new wireless sites and co -locations; second story reviews; code amendment ordinances; zone changes; variances; conditional use permits; and historic landmark designations.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginvq�g Services I November 9,2023 74

John Moreno
Environmental Planner 11
Education
B.A. Urban Studies, California State
University, Northridge
John is a highly motivated and goal -driven professional offering 17 years'experience preparing environmental compliance documents pursuant to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA) for both public and private sector clients. He has prepared Categorical Exemptions, Addenda, Initial Studies (ISs), Negative Declarations (NDs) and Mitigated Negative Declarations (MNDs), Environmental Impact Reports (EIRs), Program EIRs, Subsequent EIRs as well as tiered documents and combined CEQA / NEPA documents. He has excelled in developing comprehensive and legally defensible CEQA / NEPA documents and effective permit applications for complex and challenging projects.

His documents are precise, clearly written, and well organized. Additionally, his experience also includes preparing Housing Elements and has experience working with cities as an augment staff member primarily reviewing project plans for consistency with city development standards and land use / zoning requirements.

Technically proficient in all Microsoft Office programs and familiar with AutoCAD, ArchiCAD and Arch GIS 8. John is also fluent in Spanish.

Experience
2023-2031 Housing Element Update I City of WaSco, CA
Associate Environmental Planner. Serving as an Associate Environmental Planner, John assisted with the preparation of the City of Wasco's Housing Element to ensure the Housing Element was being prepared in compliance with all state requirements.

John took on several roles in the completion of the Housing Element which included: identifying and analyzing existing and projected housing needs for all economic segments of the community; providing a summary of the population and housing characteristics that contribute to the present and future housing needs in Wasco; provide goals, policies, quantified objectives and scheduled programs to preserve, improve and develop housing; attended several community meetings and participated in public outreach efforts, prepared a Categorical Exemption in compliance with CEQA and frequent direct contact with staff of various state agencies. Housing Programs, which John helped develop, became the basis for annual progress reports (APR). The Housing Programs included: 1) Adequate Sites for Affordable Housing; 2) Home Ownership Assistance Programs; 4) Section 8 Housing Choice Vouchers; 5) City Grants for Special Needs Groups; 7) Code Enforcement; 8) Conservation of Existing and Future Affordable Units; 9) Streamline Residential Permit Processing; 10) and Fair Housing Services.
2023-2031 Housing Element Update I City of Shafter, CA
Associate Environmental Planner. Serving as an Associate Environmental Planner, John assisted with the preparation of the City of Shafter's Housing Element to ensure the Housing Element was being prepared in compliance with all state requirements. John took on several roles in the completion of the Housing Element which included: identifying and analyzing existing and projected housing needs for -'Experience prior to joining the firm all economic segments of the community; providing a summary of the population Exhlafts�ructure Engineers, a Bowman company I Municipal EnginVr�g Services I November 9,2023 75

John Moreno
Environmental Planner 11
and housing characteristics that contribute to the present and future housing needs in Shafter; provide goals, policies, quantified objectives and scheduled programs to preserve, improve and develop housing; attended several community meetings and participated in public outreach efforts, prepared a Mitigated Negative Declaration (MND) in compliance with CEQA and frequent direct contact with staff of various state agencies. Housing Programs, which John helped develop, became the basis for annual progress reports (APR). The Housing Programs included: 1) Adequate Sites for Affordable Housing; 2) Home Ownership Assistance Programs; 4) Section 8 Housing Choice Vouchers; 5) City Grants for Special Needs Groups; 7) Code Enforcement; 8) Conservation of Existing and Future Affordable Units; 9) Streamline Residential Permit Processing; 10) and Fair Housing Services.

Associate Environmental Planner I City of Adelanto, CA
As part of IE's Planning Support and Staff Augmentation Services contract with the City of Adelanto, John provided support services to the city on CEQA compliance in preparing Adelanto's 6th Cycle Housing Element where it was determined that a Mitigated Negative Declaration (MND) would be the appropriate environmental compliance document for the Housing Element which analyzed potential environmental impacts associated with implementing the city's Housing Element.

John analyzed all environmental topic areas and where appropriate, developed mitigation measures to reduce impacts to levels below significance.

Associate Planner I City of Moreno Valley, CA
As part of IE's Planning Support and Staff Augmentation Services contract with the City of Moreno Valley, John provides support to the City of Moreno Valley as an augment staff member. Duties include reviewing project plans submitted by applicants to determine compliance with city development standards and land use / zoning requirements. Additionally, duties include reviewing CEQA environmental documentation and technical studies in support of projects as well as direct communications with city staff and project applicants.

Associate Environmental Planner / Project Manager I City of Bakersfield, CA In support of the preparation of an Environmental Impact Report (EIR) for the Hagerman Industrial Park General Plan Amendment and Zone Change in the City of Bakersfield, John has been providing support in all phases of the CEQA process, including initial project planning; public notice preparation, distribution, and filing; conducting public outreach including public meetings and hearings (traditional and virtual), Notices of Determination and other decision documents. John collects, catalogs, and responds to public comments and coordinates with responsible and trustee agencies. The City of Bakersfield lead agency in the event of a legal challenge.

Additional duties include project budget and schedule tracking.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enginvrtog Services I November 9,2023 76

Cameron Lukos, MS
GISAnolyst
Education Cameron is a CIS Analyst who has seven years of environmental consulting M.S. Environmental Science &
experience including conducting wetland delineations, noise construction Technology, California State University,
monitoring, tree surveys, nesting bird surveys, habitat restoration monitoring, with Fullerton
a concentration on CIS applications thereto. Knowledge also extends to permitting (specifically regarding USACE 404 Permits, RWQCB 401 Certifications, and CDFW 1600 B.A. Environmental Analysis, Pitzer
Agreements) and CEQA. Cameron is proficient in Wetland Delineation, CEQA, USACE College
404 Permits, RWQCB 401 Certifications, CDFW 1600 agreements, Arcmap, ArcGIS online, GPSTrirnbles and data collection, ArcGIS Collector, programming skills in Certifications
Excel, VBA, Python, R, JavaScript, SQL Databases, Tableau, Big Data, Machine Learning, Data Analysis Certification, University
Microsoft Office and Adobe Photoshop.
of California, Irvine
Experience
Basic Wetland Delineation
Certification, Wetland Training
2023-2031 Housing Element Update I City of Wasco, CA
Institute, Wisconsin
Infrastructure Engineers has been hired to prepare the 2023-2031 Housing Element for the City of Wasco. Cameron is the CIS Analyst providing CIS services and support for graphics and visuals for the Housing Element. He has conducted geospatial analysis of the City of Wasco to identify appropriate sites for residential development according to the RHNA allocation. He is preparing the site inventory AFFH analysis and corresponding figures. He conducted ADU analysis using the City of Wasco's APRs and HCD approved methodology as part of the RHNA allocation. 2023-2031 Housing Element Update I City of Shafter, CA
Infrastructure Engineers has been hired to prepare the 2023-2031 Housing Element for the City of Shafter. Cameron is the CIS Analyst providing CIS services and support for graphics and visuals for the Housing Element. He has conducted geospatial analysis of the City of Shafter to identify appropriate sites for residential development according to the RHNA allocation. He is preparing the site inventory AFFH analysis and corresponding figures. He conducted ADU analysis using the City of Shafter's APRs and HCD approved methodology as part of the RHNA allocation. 2021-2029 Housing Element Update I City of Adelanto, CA Infrastructure Engineers has been hired to prepare the 2021-2029 Housing Element for the City of Adelanto. Cameron is the CIS Analyst providing CIS services and support for graphics and visuals for the Housing Element. He has conducted geospatial analysis of the City of Adelanto to identify appropriate sites for residential development according to the RHNA allocation. He is preparing the site inventory AFFH analysis and corresponding figures. He conducted ADU analysis using the City of Adelanto's APRs and HCD approved methodology as part of the RHNA allocation. 2021-2029 Housing Element Update I City of Lynwood, CA
Infrastructure Engineers has been hired to prepare the 2021-2029 Housing Element for the City of Lynwood. Cameron is the CIS Analyst providing CIS services and support for graphics and visuals for the Housing Element. He has conducted -'Experience prior to joining the firm geospatial analysis of the City of Lynwood to identify appropriate sites for residential Exhlafts�ructure Engineers, a Bowman company I Municipal Enginvrtog Services I November 9,2023 77

Cameron Lukos, MS
GISAnolyst
development according to the RHNA allocation. He is preparing the site inventory AFFH analysis and corresponding figures. He conducted ADU analysis using the City of Lynwood's APRs and HCD approved methodology as part of the RHNA allocation.

General Plan and Zoning Code Consistency Project I City of Bell Gardens, CA Infrastructure Engineers has been contracted to assist the city in updating the General Plan to ensure consistency with the Zoning Code. The city is evaluating approximately one hundred parcels for zone change to allow for more rnixed-use and residential development throughout the city. Cameron is the CIS Analyst who conducted geospatial analysis if the City of Bell Gardens to identify inconsistencies between the General Plan Land Use Map and Zoning Map. He prepared GIS-based maps of existing land use and zoning designations and updated those land use and zoning maps to correct identified inconsistencies.

Environmental Justice Element and Public Safety Element Update I City of Lynwood, CA
CIS Analyst. Cameron is providing CIS services and support to assist in the production of tables, figures and exhibits.

Asian Garden Mail Parking Structure I City of Westminster, CA CIS Analyst. Cameron is providing CIS services and support for graphics and visuals in production of project description.

Ruth Villalobos and Associates I Ontario, CA*
CIS Analyst / Associate Biologist. Cameron supported and assisted in conducting biological surveys and wetland delineations. Prepared maps and complex databases using a variety of digital data sources including the most current aerial photography, AutoCAD, GPS field collection data, and geo-transformation of historic data for production of various reports, including wetland delineations and permit applications. Reviewed and prepared EIR and CEQA document sections, project descriptions, technical documents, and biological documents. Utilized software knowledge including ArcGIS I O.X, ArcGIS Online, Arc Collector, Trimble CPS Receivers, Pathfinder Office Software, Adobe Photoshop and Microsoft Office (Word, Excel, Glenn Lukas Associates I Santa Ana, CA*
CIS Technician. Cameron formulated CIS models for wetland delineations, mitigation plans, biological surveys, environmental planning and land use planning. Conducted CIS analyses for U.S. Army Corps of Engineers, Regional Water Quality Control Board, and California Department of Fish and Wildlifejurisdictional delineations, biological resources and impact and environmental assessments / alternatives analyses.

Prepared relevant, presentable, project -specific exhibits for reports and CEQA documents that depict aquatic resources, biological resources, monitoring areas, proposed impacts, proposed restoration and photo documentation.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin22�g Services I November 9,2023 78

Bahar Baradaran, EIT
Utility Engineer and Engineering Assistant
Education Bahar Baradaran has four years of experience in civil engineering that includes M.S. Civil and Environmental
roadway infrastructure projects.

Engineering with a focus on Water
Experience
Resources, California State University,
Bell -flower Street Rehabilitation Project I City ofAdelanto, CA Fullerton
Engineering Assistant for designing and planning the primary pavement B.S. Civil Engineering, University of
rehabilitation, water main and sanitary sewer lines. Also designed the pavement Science and Culture, Iran
based on the geotechnical report and was responsible for coordinating with geotechnical investigators to identify the pavement design and requirements.

Registrations
Prepared plans, profiles, specifications and cost estimate for this project. Also sent Engineer in Training (EIT):
utility notices and coordinated with Edison, water and gas companies.

California (#178797)
Bartlett Avenue Rehabilitation Project I City ofAdelanto, CA Engineering Assistant who gathered data from survey and site inspections to design and plan the main water and sewer lines. Collaborated with client to develop water and sewer improvement plans and profiles in compliance with city regulations.

Conducted extensive research and analysis of existing infrastructure, topography and environmental factors to develop effective solutions. Designed and drafted detailed plans and profiles using Civil 3D. Managed project timelines and prepared cost estimate to ensure it was within budget limits and provided the best value.

SBI Santa Fe Avenue and Miles Avenue I City of Huntington Park, CA Engineering Assistant who was instrumental in sketching plans for sanitary sewer, water and street enhancements. This included detailed plan, cross -sectional views and traffic striping. Played an essential role in helping with specifications and calculating the cost estimate for the project, which entailed updating the outdated water and sanitary sewer systems to meet current standards.

CIP Priority 213 Street Improvement Project I City of Lynwood, CA Engineering Assistant who created all sheets for improvements and utility relocations for the city's Phase 2 CIP Street Improvement Project. Tasks included coordinating with utility companies and conducting field investigations to obtain measurements of existing site and proposed improvements. Prepared specification package per Greenbook and has developed quantities for removals and improvements for cost ATP Cycle 2 Lynwood Community Linkages to Civic Center and Long Beach Boulevard I City of Lynwood, CA
Engineering Assistant responsibile for creating the signing and striping sheets for the project. Work involved creating the construction notes and designing the new striping on AutoCAD.
-'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2lring Services I November 9,2023 79

Bahar Baradaran, EIT
Utility Engineer and Engineering Assistant
Street Rehabilitation Project I City of Bell Gardens, CA Engineering Assistant responsible for developing street cross section and base map; performed field reconnaissance to inspect and verify surface indications of utilities. Infrastructure Engineers is providing design, project management, bidding of contract, construction management and inspection, as well as federal fund administration for this project that involves removal of existing AC paving and paving of AC pavement and concrete improvement reconstruction, including replacing existing curb and gutter, sidewalk, driveway approaches, access ramps, and adjustment of utility covers, traffic striping, markers, pavement markings and curb MM
Internship at City of Irvine I City of Irvine, CA*
Intern who acted as a sustainability manager assistant. Aided in the development of plans on drainage, road, and residential projects and helped with environmental studies, permitting and alternative analyses. Observed the preparation, function and process of tender and contract documents in action and assisted civil engineers to fulfill these. Also collaborated with research on other projects as a team member.

Internship at William Simpson and Associates I City of Lake Forest, CA* Intern who drafted detail of sections, plans, and elevations with AutoCAID. She handled cost of materials estimations, report and document tracking, project documentation, on -site project visits, and building permit applications. Bahar shadowed senior civil engineer on a project to determinate the on -going stability of concrete stabilized footpath around a commercial center.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2&g Services I November 9,2023 80

Hamed Habibi, MS
Engineering Assistant
Education
M.S. Transportation Planning,
International University of Qazvin, Iran
B.S. Civil Engineering, Sharif University
of Technology, Tehran, Iran
blamed Habibi has 12 years of experience in traffic engineering, especially in Traffic Signal Planning, Actuated Traffic Signal Systems, and ITS systems. His experience includes drafting, and designing traffic signal plans, writing traffic signal warrants and stop sign warrant reports, creating cost estimates, generating specifications, designing street overlays, and generating conceptual imagery for exhibits in different projects.

Registrations Experience
SCATS Training Course / RTA / New Quiet Zone Preparation of PS for 12 Railroad HWY Crossings I City of Covina, CA South Wales -Sydney- Australia Engineering Assistant. Responsible for preparation of proposed Improvement plans for 12 highway/ railroad crossings including quadratic gates, medians, pavement, traffic striping, markings and signage in accordance with CAMUTCD and Metrolink Standards.

Left Turn Warrant Studies for Five Intersections at Slauson Avenue I City of Huntington Park, CA
Engineering Assistant. Responsible for creating the left turn warrants report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersections, simulated these five intersections in Synchro for five different scenarios, conducted pedestrian safety analysis and provided a field review of existing conditions.

All -Way Stop Sign Warrant Analysis - Florence Place and Scout Avenue Intersection I City of Bell Gardens, CA
Engineering Assistant. Responsible for creating the all -way stop warrant report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.

All -Way Stop Sign Warrant Analysis - Jaboneria Road and Gotham Street Intersection I City of Bell Gardens, CA
Engineering Assistant. Responsible for creating the all -way stop warrant report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.

Speed Zone Survey and Speed Limit Study for Garfield Avenue I City of Bell Gardens, CA
Engineering Assistant. Responsible for creating Speed Survey Analysis report in accordance with CA-MUTCD and CVC. Conducted an analysis on the collision history of the intersection, Road Condition Analysis and provided a field review for achieving the efficient speed limit.
-'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal Engin22tog Services I November 9,2023 81

Hamed Habibi, MS
Engineering Assistant
Transportation Assessment for the Rancho Adelanto City Center Project I City of Bell Gardens, CA
Engineering Assistant. Responsible for creating the Transportation Assessment report including Project Trip Generation based on ITE-Trip Generation Manual (last edition), Project Trip Distribution & Trip Assignment, Vehicle Miles Traveled (VMT) Assessment, Traffic Signal Warrants Study, analysis of other modes of transportation (non-autornobile facilities) for the project. This involved using AutoCAD to create the Conceptual Traffic Signal Plan and Access Improvement for the proposed intersection.

All -Way Stop Sign Warrant Analysis - Bell -flower Street and Lawson Avenue Intersection I City ofAdelonto, CA
verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.

All -Way Stop Sign Warrant Analysis - Stevens Street and Bartlett Avenue Intersection I City ofAdelanto, CA
Engineering Assistant. Responsible for creating the all -way stop warrant report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.

All -Way Stop Sign Warrant Analysis - Stevens Street and Kemper Avenue Intersection I City ofAdelanto, CA
Engineering Assistant. Responsible for creating the all -way stop warrant report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.

NewTraffic Signal at Imperial Hwy and Ruth Avenue Intersection I City of Lynwood, CA
Engineering Assistant. Responsible for the design of the traffic signal, striping plans, specifications, and cost estimate for the new traffic signal intersection. This involved using AutoCAD to create the general notes, construction notes, conductor schedule, traffic signal plan and phase diagram for this project.

Engineering, Assistant. Responsible for creating the PHB, all-w n, and traffic signal warrant report and verifying the warrant conditions satisfied on the CA- MLJTCD, Designed a collision diagram, conducted an analysis on the collision history - of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2*g Services I November 9,2023 82

Michael Dela Cruz, EIT
Engineering Assistant
Education Experience
B.S. Civil Engineering, California State Infrastructure Engineers, a Bowman company I Brea, CA University, Los Angeles
Engineering Assistant. Performed tasks contributing to the completion of various public works projects under the supervision of a professional civil engineer registered Registrations
in the State of California. These tasks include CAD drafting / design; grading and Engineer in Training (EIT):
drainage design, preparation of plans, specifications, and estimates (PS&E); submittal California
and plan check coordination with agencies, clients, and subconsultants; preparation of Standard Urban Storrnwater Mitigation Plans (SUSMP) and Water Quality Management Plans (WQMP); quantity takeoff, earthwork calculations, and field checks.

Bell -flower Avenue Rehabilitation Project I City ofAdelanto, CA Engineering Assistant. Assisted in the development of preliminary Plans, Specifications and Estimate (PS&E) for full -depth asphalt pavement rehabilitation, including redesigning curb ramps to meet ADA compliance. Pavement design was based on geotechnical recommendations and city requirements. Coordinated with land surveyor to identify limits of right-of-way and required dedication.

Bartlett Avenue Rehabilitation Project I City ofAdelanto, CA Engineering Assistant. Assisted in the development of Plans, Specifications and Estimate (PS&E) for full -depth asphalt pavement rehabilitation, including redesigning curb ramps to meet ADA compliance. Pavement design was based on geotechnical recommendations and city requirements. Coordinated with land surveyor to identify limits of right-of-way and required dedication.

San Gabriel River Greenway and Neighborhood Connection Project I City of Baldwin Park, CA
Engineering Assistant. Assisted in the development of Plans, Specifications and Estimate (PS&E) for the landscaping of a 2.3-mile shared -use bike trail currently under construction. Coordinated for plan review and project compliance on behalf of the City of Baldwin Park with various governmental agencies, including United States Army Corps of Engineers (USACE), Los Angeles County Flood Control District (LACFCD), and Los Angeles County Department of Public Works (LACDPW). Contacted vendors to incorporate project elements crucial to the project scope. Coordinated with the Landscape Architectural subconsultant to ensure landscape and irrigation plans comply with requirements of the aforementioned agencies.

Big Dalton Wash Greenway and Neighborhood Connection Project I City of Baldwin Park, CA
Engineering Assistant. Assisted in the development of Plans, Specifications and Estimate (PS&E) for a 2.8-mile shared -use bike trail. Coordinated for plan review and project compliance on behalf of the City of Baldwin Park with various governmental agencies, including United States Army Corps of Engineers (USACE), Los Angeles -'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal Engin22gig Services I November 9,2023 83

Michael Dela Cruz, EIT
Engineering Assistant
County Flood Control District (LACFCD), Los Angeles County Department of Public Works (LACDPW), Southern California Regional Rail Authority (SCRRA) and neighboring municipalities. Contacted vendors to incorporate project elements crucial to the project scope.

P.A. Area Engineering, Inc. I City of Carson, CA*
Junior Civil Engineer. Performed tasks contributing to the completion of various private land development and public works projects under the supervision of a professional civil engineer registered in the State of California. These tasks include:

CAD drafting / design, grading and drainage design, low impact development (LID) design, preparation of SUSMP and WQMP, preparation of Storm Water Pollution Prevention Plan (SWPPP) reports, SWPPP inspections, hydrology studies, cost estimate, quantity takeoff, earthwork calculations, construction administration and support, sewer area studies, slope density analysis, and field checks.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin22�g Services I November 9,2023 84

Jaelin Murray, EIT
Engineering Assistant
Education
B.S. Civil Engineering with a
specialization in Structural
Engineering, University of California,
Irvine
Registrations
Engineer in Training (EIT):

California (#178483)
-'Experience prior to joining the firm
Jaelin Murray has two years of experience in civil engineering which includes roadway and storrnwater projects.

Experience
ATP Cycle 5 Citywide Complete Street Improvements Project I City of Bell Gardens, CA
Engineering Assistant. Jaelin was instrumental in drafting base maps from survey and assessor maps. Also responsible for creating existing utility maps and creating plan cut sheets.

South Verdugo Road Pavement Rehabilitation I City of Glendale, CA Engineering Assistant. Played an essential role in conducting field project walks utilizing CIS to identify damaged or hazardous utilities, concrete and pavernent. She also checked and identified sidewalks, driveways and ramps for proper width, height and slope. Prepared plan sheets for improvements, designing driveways and ramps.

Industrial Commercial Facilities Program Project I City of Bell Gardens, CA Engineering Assistant. Responsible for creating inventory and gathering data on each commercial and industrial facility that meets need for a NPDES permit. Tasks also included coordinating appointments for inspection, conducting storrnwater pollution prevention inspections of facilities, and record keeping photos, inspection forms, and notes.

Infrastructure Engineers, a Bowman company I Brea, CA
Intern. Aided development of plans for beautification and rehabilitation projects.

Jaelin also aided in the development of specifications packages. Coordinated utility notices for traffic and rehabilitation projects. Handled quantities and subsequent cost estimates for various roadway improvements and beautifications. Drafted preliminary design of retaining ring wall design.

Internship I City of Dona Point, CA*
Capital Improvement Project Intern. Drafted project exhibits and utility maps with AutoCAD. She streamlined records of city property inventory, construction budgeting and bid scheduling. Aided in the development of roadway project plans and as-builts.

Accompanied, conducted field walks for topography, drainage, and roadway damage assessment. Navigated records requests for right of way, building plans and utility maps.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2&g Services I November 9,2023 85

Jennifer Santillan
Engineering Assistant
Education Jennifer Santillan has four years of progressive experience in design and CAD support B.S. Civil Engineering, University of in engineering and transportation. She has experience working for civil design, California, Irvine engineering, and transportation companies prior to joining Infrastructure Engineers, a Bowman company.

Experience
Various Residential Street Improvements Projects I City of Bell Gardens,, CA Engineering Assistant who worked on the design of pavement rehabilitation of various residential streets within the City of Bell Gardens. This included preparing plans, specifications and estimate for the city to advertise the package for contractors to bid. Other roles included sending out utility notices to coordinate with Edison, water, and gas companies. (2021-2022)
Arterial Street Improvement I City of Bell Gardens, CA
Engineering Assistant who prepared alignments, profiles, utility research, and many other items for plans and also communicated with the engineering team on projects and assisted the staff engineers with their day-to-day duties. Coordinated field investigations with city staff and took field data measurements to then be able to map on AutoCAD and prepare improvements, establish quantities necessary for work, prepare a cost estimate and develop a spec package for performance and bidding requirements. (2021-2022)
CIP Priority 2 Street Improvement Project I City of Lynwood, CA Engineering Assistant who coordinated with geotechnical investigators to obtain boring and coring results to identify pavement rehabilitation requirements on various streets within the City of Lynwood. Other tasks included obtaining field data from conducting multiple site investigations and plotting obtained data onto AutoCAD. (2022-2023)
Transportation Intern for City of Costa Mesa I City of Costa Mesa, CA* Intern who authorized parking, film, and oversize load permits. She also developed interpersonal skills for communicating via telephone as well as ernail correspondence with the residents of Costa Mesa.

Engineering Intern for RCE Consultants Inc. I CA*
Intern who learned how to do markups, alignments, profiles, utility research, and many other items for plans. Also communicated with the engineering team on projects and assisted the staff engineers with their day-to-day duties. Learned how to be independent in her assigned tasks, and was self -motivated when given a task.

Civil Design Team for UCI Transportation & Distribution Services I CA* Worked in a team to update and design AutoCAD drawings for UCI parking lots, parking structures, and roadway striping. Also completed fieldwork in measuring, locating utilities, striping, and analyzing existing sites. -'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal Engin22tog Services I November 9,2023 86

Annie Li
CAD Technician
Education Experience
B.S. Electronics, Suzhou Advanced Bill Carr Surveys, Inc. I Anaheim, CA* Electronic College, Suzhou, China CAD Drafter. Anchor bolt sheet preparation. Provided coordinates to locate U.S. Site location. Checked dimensions, scaled and aligned the drawings, changed layer colors Certifications and dirn to start a new drawing or match previous. Page setup, pdf and plot, export Drafting - Computer Aided Technical all the cogo pnts data out. Imported all the data into excel spreadsheet, data entry Modeling and Animation Certificate, grids, bbp, pattern types info, extract data and processed them into AB Report. Sent Pasadena City College to client.

GKC Engineering Corp. I Irwindale, CA*
CAD / System Manager. Drew rough and detailed scale plans using cornputer-assisted drafting (CAD) equipment and software in the design of foundations, buildings, and structures from start to finish, based on preliminary concepts, sketches, survey points, engineering calculations, specification sheets, and other data, in support of engineering. Prepared professional sheets, drawings, and documents, meeting contractor specifications and compliant with industry standards, legal requirements, municipal codes, and regulations. Developed plans for grading, exterior buildings, parking lots, storm drains, street improvements, and street lighting within the confines of the property; some residential experience. Generated cross section views; edited existing ground profiles and finished ground profiles. Surveyed construction documents from points to drawing. Worked closely with designers and drafters and supported engineering staff to ensure coordination with interior design. Collected and processed information and data for engineering development by researching and obtaining standards / codes required by client and jurisdiction through interaction with necessary personnel to accurately and efficiently develop plans 2MMfflM==
Drew rough and detailed scale plans using cornputer-assisted drafting (CAD) equipment and software in the design of foundations, buildings, and structures from start to finish, based on preliminary concepts, sketches, engineering calculations, specification sheets, and other data, in support of engineering. Prepared professional sheets, drawings, and documents, meeting contractor specifications and compliant with industry standards, legal requirements, municipal codes, and regulations.

Developed plans for grading, exterior buildings, parking lots, storm drains, street improvements, and street lighting within the confines of the property; some residential experience. Generated cross section views; edited existing ground profiles and finished ground profiles. Worked closely with designers and drafters and support engineering staff. Collected and process information and data for engineering. -'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal Engin22§lg Services I November 9,2023 87

Rickey D. Stuchell
Director of Right -of -Way and Land Services
Education
Rickey Stuchell has specialized in the appraisal of Real Property since 2004 and Coursework, Allied Business Schools,
will serve as Project Manager for this contract with the City of Lynchburg. He is Inc.
qualified as an Expert Witness in matters pertaining to real estate, has served as an Appraiser for the Virginia Department of Transportation, and as Negotiator on Coursework & Seminars, The Real
numerous projects. In January of 2017, the Governor of Virginia appointed Rickey Estate Academy, Inc.
to be a member of the Real Estate Appraiser Board through the year 2020 and is the FHWA-NHI Programs
chairman of the appraisal board and was re -appointed through 2024. In addition, he VDOT Specific Appraisal Seminars
has been a Project Manager on small acquisition projects, and a Relocation Specialist on other projects.

Coursework & Seminars, The Appraisal
Institute
Experience
VDOT 1-66 Express Lane P3 Project I Fairfax, VA
Registration
Lead appraiser and appraisal manager for a 275-parcel project.

Certified General Real Estate Appraiser:

Virginia and West Virginia
Route 460 1 Lynchburg, VA
Lead negotiator and relocation agent on this project. Mr. Stuchell handled 5 State Licensed Real Estate Salesperson:
negotiations and 2 residential relocations on the project meeting an aggressive Virginia
design build schedule.

Appraisal Experience
Route 29 Interchange I Culpeper, VA
500+ Eminent Domain Appraisals
Lead negotiator and relocation agent on this project. This project is being constructed Completed since 2006
to create a flyover and on and off ramps from Route 29 to Route 666 eliminating the need for a signalized intersection. Mr. Stuchell handled the appraisals for 10 of the Commercial, Industrial & Residential
parcels and the negotiation for an additional 7 parcels.

Experience
Qualified Expert Witness:

Route 7 Widening I Fairfax, VA
City of Charlottesville, VA
Lead appraiser and appraisal manager for a 11 O-parcel project. Mr. Stuchell handled Colonial Heights, VA
all of the advanced appraisals that required significant acquisitions and oversaw a Culpeper County, VA
team of 2 review appraisers and 5 appraisers on the project.

Fauquier County, VA
Dulles Metro Rail, Phase I I DCMetro, VA
Lead negotiator and relocation agent on this project. This project involved the Affiliations/Memberships
extension of the rail service from the DC metro area beyond Tyson's Corner. Mr.

Virginia State Real Estate Appraiser
Stuchell handled the negotiations of 15 parcels and the relocation of 3 businesses.

Board, Chairman
Rolling Road I Fairfax, VA
Location
Lead appraiser and project manager for a 142-parcel project. Mr. Stuchell oversaw a Fredericksburg, VA
team of one (1) Review Appraiser, five (5) Appraisers, and five (5) Negotiatiors on the project.
-'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2j�g Services I November 9,2023 88

Chelisa Pack, MS, PE, QSP / QSD
Drainage and Stormwoter Engineer
Education Chelisa is a registered civil engineer and has over 18 years of experience specializing Master of Science, Emphasis in Water
in drainage and stormwater quality. Her expertise spans a wide range of public and Resources, University of Colorado at
private projects in Riverside and San Diego Counties including development and Boulder
implementation of stormwater pollution prevention plans (SWPPPs), design of storm drain improvements, analysis of hydromodification management practices, analysis B.S., Civil Engineering, Brigham Young
of hydrology and hydraulic models and design of Best Management Practices (BMPs), University
which includes Low Impact Development (LID) practices.

Registrations
Experience
Professional Engineer: California
The Villages I City of Escondido, CA
(#71026)
Implemented regional BMP and drainage strategy for 11 O-acre residential Qualified SWPPP Developer (QSD) and
development that included redevelopment of a former golf course. Also included Qualified SWPPP Practitioner (QSP) in
offsite roadway and drainage improvements within both the Caltrans and city California
jurisdiction for the 380-unit development.

BallparkVillage I Son Diego, CA
Developed water quality technical report and drainage study for Ballpark Village mixed use high rise near Petco Park for JMI. Evaluated design options to address project's drainage challenges and coordinated with building team for water quality BMP design and construction. Developed stormwater pollution prevention plan (SWPPP) and trained construction staff regarding weekly inspections to comply with CGP requirements.

Park and Market I Son Diego, CA
Prepared drainage study and storm water quality management plan for high profile mixed use downtown redevelopment block. Coordinated with building team for integrated BMP solutions and green roof for stormwater compliance.

North Ernbarcadero Visionary Plan I Son Diego, CA
Developed drainage and water quality studies for Phase I of San Diego's western waterfront revitalization project.Tasks included preparation of construction documents to shift Harbor Drive east to create a I 00-ft promenade between E Street and B Street and improvements to West Broadway from the railroad tracks to Harbor Drive to create a "Grand Hall" leading to the Harbor. SWPPP development included complex phasing and traffic control plans. Provided construction support services to revise the drainage design due to field constraints.

Lane Field North and Setback Park I Son Diego, CA
Prepared SWPPP and water quality technical report for downtown San Diego's waterfront redevelopment project. Assisted processing of the Water Quality Technical Report through approval by the Port of San Diego and California Coastal Commission.

Coordinated with geotechnical and landscape consultants on measures to reduce stormwater pollution to San Diego Bay.
-'Experience prior to joining the firm
Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2ling Services I November 9,2023 89

Chelisa Pack, MS, PE, QSP / QSD
Drainage and Stormwoter Engineer
Performed the CEQA master drainage plan and regional water quality analysis for the future expansion of the San Diego Convention Center to support the EIR. The intent of the analysis is to discover the best regional strategy to address the impacts of expansion and minimize disturbances to existing infrastructure.

Old Police Headquarters I Son Diego, CA
Performed the CEQA master drainage plan and regional water quality analysis for the future expansion of the San Diego Convention Center to support the EIR. The intent of the analysis was to discover the best regional strategy to address the impacts of the expansion and minimize disturbances to existing infrastructure.

Encanto and Southeast San Diego Community Plan Update I Son Diego, CA Prepared drainage and water quality summary report in support of the Program EIR for two community plan updates for the City of San Diego. Reviewed CEQA documents and coordinated with EIR team on CEQA drainage and water quality mitigation measures.

Quarry Creek I Carlsbad, CA
Developed stormwater management plan / hydromodification report and drainage studies for Quarry Creek Development Master Plan, encompassing 73 acres of development within a sensitive reclamation area. Designed and implemented regional approach to drainage and water quality design, beginning at the Tentative Map and EIR preparation stage to the final engineering grading plan stage.

Coordinated with EIR team and city staff regarding BMP selection and maintenance.

Front and A Courthouse Commons Redevelopment I Son Diego, CA Developed drainage study and storm water quality management plan for redevelopment of the old Courthouse block into a residential tower.

Mercado del Barrio Mixed Use Development I Son Diego, CA Coordinated LID design from entitlement through final engineering with a fast track schedule. LID components included porous paving and bioretention areas for parking lot, which required detailed coordination between project geotechnical engineer and landscape architect.

Oceanside Sp ring Suites Hotel I Oceanside, CA
Developed storrnwater mitigation plan and BMP O&M manual for hotel site.

Designed LID bioretention BMPs in coordination with project landscape architect and geotechnical engineer.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2ling Services I November 9,2023 90

Jon Becker, RLA, AICP
Landscape Architect
Education Jon Becker has provided management and design for both public and private B.S. Landscape Architecture,
developments in many locations throughout the US and Mexico, with most of his The Ohio State University, 1978
experience focused in the Southwest. His background includes both physical and policy planning, with his physical planning experience ranging from half -acre infill Real Estate Land Development,
sites to several -thousand -acre walkable community developments. He designs urban U.C. San Diego, 1994
settings, residential housing communities, park developments and commercial facilities. No matter how small or large the project, his focus has always been to create Registrations
livable neighborhoods with a sense of place. Jon's master plan projects integrate Registered Landscape Architect:
housing, commercial, school, and park developments with multi -modal linkages. His California (#2542), 1983
policy planning experience has included the preparation of specific plans, permitting Ohio (#468),1982
for planned residential developments, tentative maps, conditional use permits and Arizona (#30593),1996
environmentally sensitive lands. Much of his design experience has been in support Nevada(#606)
of environmental permits such as EIRs, Army Corps 404 permits, U.S. Fish and Wildlife, California Fish and Game, and Coastal Commission permits. Jon has also served as an Associations
expert witness and consultant in land use planning. Additionally, he has completed American Society of Landscape
many successful park projects (some award winning), open spaces, streetscapes, Architects
commercial projects and golf courses.

American Planning Association
Experience
Citizens Coordinate for Century 3
Aviara Community Park I Carlsbad, CA
Urban Land Institute
Landscape architect of the master plan and supervised the preparation of construction documents and construction observation, for a 28-acre active -use Community Involvement
community park.

Urban Forest Advisory Board (Mayoral
Dennery Ranch Neighborhood Park I Son Diego, CA
Appointee), Member
Located in the Ocean View Hills community, Dennery Ranch Neighborhood Park Rancho de los Pensaquitos Community
provides nine acres of population -based park land in the park deficient community.

Planning Group, Past Chair
The design process started with two public workshops with the community. The Land Use Committee, Chair
initial workshop focused on gathering the community's input and vision for the future park site. PDC, a Bowman company was then able to weave community input and Park Village Landscape Maintenance
city comments into a cohesive design that was presented to the community in the District, Chair
subsequent workshop where we received approval from the Ocean Views Recreation City of San Diego Park and Recreation
Council. This allowed us to present to the City of San Diego Park and Recreation Board Board (Mayoral Appointee), Member
where we received unanimous approval of the project. Park design included open play turf area, drought tolerant landscaping, multiple tot lots, fitness stations, two half -court basketball courts, skate plaza, bicycle playground, pre -fabricated comfort station, 75 stall parking lot, decomposed granite walkways with overlooks, drinking fountains, benches, picnic tables, shaded structures, and a trailhead connection to Otay Valley Regional Park.

Ziana Town homes I La Jolla, CA
Landscape architect responsible for preparing planting and irrigation streetscape plans for the frontage along the new residential project fronting Torrey Pines Road.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2j�g Services I November 9,2023 91

Jon Becker, RLA, AICP
Landscape Architect
The streetscape planting followed the La Jolla Shores Planned District Ordinance requirements, the city's street tree requirements, and the city's water audit requirements. To achieve a water -efficient outdoor environment, a drought -tolerant pallet of plant material was used and serviced by three types of irrigation systems; low-volurne spray, drip tubes, and drip emitters. Custom designs for fencing and gates were provided.

Landscape architect for the widening of the public street into an adjacent commercial center. As part of a Public Facility Financing Plan improvement project, the stakeholders required photo simulations for the road expansion illustrating retaining wall design themes and landscape as well as vehicular and pedestrian barriers. The construction documents were prepared for detailed wall design, planting, irrigation, details and specifications processed through the City of San Diego.

Pacific Coast Highway I Son Diego, CA
PDC, a Bowman company's landscape architects provided conceptual design, community review/approval and construction documents. The streetscape design included exposed aggregate and brick, irrigation, drainage and palrn trees along the highly visible roadway.

Reclaimed Water Retrofit, City of San Diego I Son Diego, CA deliver recycled water tn n. Pn q. ark areas. The develln rffripnt ect was for Maintenance Assessment Districts (MAD) and three community parks.

Jamul Fire Station I Jamul, CA
Land architect/planner for the Rural Fire Protection District (RFPD) Fire Station site project within the larger Peaceful Valley Ranch.The project was for updating the discretionary site plan concurrently while updated the construction documents for the proposed fire station.

SDCRM I La Jolla, CA
Landscape architects on the multi -disciplinary team providing irrigation design for the streetscape and on -site improvements along La Jolla Scenic Drive and North Torrey Pines Road in the UCSD area. A recycled water irrigation system was designed with drip irrigation within the public right-of-way, the on -site parking, drop-off areas, viewing garden and hillsides.

North Embarcadero Visionary Plan I Son Diego, CA
Landscape architect on the multi -disciplinary team providing irrigation design for the streetscape of this promenade along the San Diego Bay. The low flow irrigation design required detailed coordination amongst multiple disciplines in the urban setting.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2jAng Services I November 9,2023 92

Qualifications, Related Experience and
References

Qualifications, Related Experience and References
The proposed IE team members exhibit the interpersonal skills, level of integrity, thoroughness, proactive approach and technical competence required by the city. Our staff has the proven ability to multi -task and to work with minimal supervision that is required to meet the city's current staffing and project needs. The team has a diverse experience in a variety of street improvement, water and sewer, storm drain, grading, traffic, vertical construction and environmental projects.

The various organizational structures in this proposal illustrate our project team structure and lines of communication.

Resumes for these staff were also provided.

Sid Mousavi, MSCE, PE will act as Principal -in -Charge. At IE Sid is the Senior Principal. Sid has over 35 years of experience in engineering projects covering a wide range of municipal management, civil engineering, transportation, public works, construction management, traffic engineering, community development and redevelopment, parks and recreation facilities, and public and private land development. Sid is responsible for the direction and administration of internal services, civil engineering design, city services and other corporate management responsibilities and matters. Prior to joining IE, Sid's accomplishments included serving as City Manager, Director of Public Works, and City Engineer for various cities in Southern California, with responsibilities for directing and administering such functional elements as engineering, planning, building & safety, facilities and equipment, landscaping, streets, environmental services, transportation, transit and other municipal services. Responsibilities also included communication with city councils, city commissions, other city departments and governmental regulatory agencies, utility companies, contractors, consultants, and the general public. Sid has performed the entire spectrum of engineering activities, which include engineering investigations, conceptual and feasibility studies, planning / scheduling, design, specifications, cost analysis, cost estimating, contract negotiations, construction management and engineering support services. Sid has served as the contract City Engineer for the City of Bell Gardens, City of Montebello, City of Irwindale, City of La Puente and City of Baldwin Park.

Masoud Sepahi, PE® LEER GA will serve as City Engineer and Director of Construction Services. At IE Masoud is the Principal of Construction Management Services. Masoud has over 35 years of experience working for both public agencies in addition to the private sector, managing a variety of large and complex public works and capital improvement projects. He has held various leadership positions in managing a variety of projects for major public works programs. As the City Engineer for the City of Placentia, he was responsible for delivery of many projects. As the Director of Construction Management for the Los Angeles Metropolitan Transportation Authority, Masoud was responsible for the southern portion of the Crenshaw / LAX Transit Project. During his tenure with LA Metro, Masoud was responsible for management of all construction on the Southern segment of the project, including major utility relocations. Working for the City of Los Angeles for 10 years, Masoud held various positions, managing many types of public improvement projects as well. The following is a partial list of projects that Masoud has successfully managed over the last 35 years.

Douglas Benash, PE® QSP / QSD will serve as Development Engineer and Water Quality Engineer. Doug has more than 30 years of experience in municipal engineering, construction management, contract administration, design experience, and regulatory compliance. In working with small jurisdictions as a City Engineer, he has been involved in all aspects of the projects that cities have designed and constructed. This includes coordinating with local, county, state and federal agencies, and various utilities to ensure successful project completion. Douglas understands the level of detail and problern-solving skills required to complete high -profile projects on time and within budget. He provides this level of expertise as projects are developed, designed, and constructed. Douglas also manages capital improvements, providing quality design and management of public works projects to our client cities. He oversees and reviews the designs, studies, investigations, plan checks, surveys, and funding requirements for projects. He also facilitates and assists agencies in the bidding process, awards of contracts, initiation of construction and construction and project closeout. Douglas oversees proper file documentation, particularly for federally or state -funded projects, labor compliance, funding administration and project acceptance and provides full construction management.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin2j�g Services I November 9,2023 93

Qualifications, Related Experience and References (cont.) Aldan Mousavi, MBA, PE® QSP / QSD will serve as Director of Design Services and NPIDES Manager. At IE Aidan is the Principal of Design Services. Aidan's professional focus is primarily in the field of city engineering and environmental infrastructure by providing civil engineering assistance to Public Works and Engineering Departments. He works closely with cities to ensure compliance with the National Pollutant Discharge Elimination System (NPDES). Aidan has developed strategies for the efficient use of Best Management Practices (BMPs), thus gaining a set of skills that not only assists municipalities with compliance but helps keep them under budget as well. Aidan is familiar with municipal protocols and works within these structures to conduct field inspections and develop annual compliance reports. As an MBA graduate, Aidan brings his academic knowledge to IE to work with the firm's Operations Manager to manage all Capital Improvement Program (CIP) and non-CIP projects.

Per the RFP, IE's "Related Experience and Client Reference List" appear in the "Appendix" of this proposal located here.

Exhlafts�ructure Engineers, a Bowman company I Municipal Enging Services I November 9,2023 94

Cost
and Pricing

Cost and Pricing

PROPOSAL PRICE SHEET
A. City Retainer:

City Engineer @ $ 5,320 per month
B. As -needed Traffic Enaineer:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

C. Public Works Right of Way Permit Management and Inspection:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

D. As -Needed Water Engineer:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

E. As -Needed Development Engineer:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

F. As -Needed Public Works/Capital Improvement Program Projects:

These services will be billed as a percentage of a project's construction cost. Specify the percentages for the services listed below for construction costs less than $499,999, construction cost between $500,000 - $999,999, construction cost between $1,000,000 - $4,999,999, and construction cost over $5,000,000:

1. Design Services _%

2. Project Management and Administration _% Appears on the following pages

3. Funding Management _%

4. Construction Management _%

5. Construction Inspection _%
For Labor Compliance, attach the hourly rates for the various classifications that would be billed to the City under this category.

G. As -Needed Other Public Works Engineering Services:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

H. NPDES Stormwater Compliance Consultant Services
Attach the hourly rates for the various classifications that would be billed to the City under this category.
42 Exhi afts�ructure Engineers, a Bowman company I Municipal Engin21tog Services I November 9, 2023 95

��=~o��� ����=0 ���°@_°���� (cont.)
� ����~~�~~~~�m m-.m.~m~~�� K.~~~~~��
�
Due toour on -going partnership with the City Bell Gardens, weare providing l0% discounts onall the hourly rates listed here.

All other rates will be based on the Infrastructure Engineers 2022 - 2023 Hourly Rate Schedule.

Themethod of compensation for each type of service isasfollows:

City Engineer Retainer: $5,320 lump sum per month
For the proposed retainer fee|nfmstnuctueEngineeopnoposestopnmkdeBhouoperweekofCityEngineehngsemices The City Engineer / Deputy City Engineer will attend all City Council meetings and anyTraffic Commission meetings, as requested by the Director of Public works. During other hours of the week, the City Engineer will be available to respond to any city inquiries via ernail or telephone calls.The retention payrnent will provide the city up to 35 hours per rnonth of City Engineering Services. Any hours beyond 35 hours will be charged as extra at the following discounted hourly rate:

City Engineer: $l7Bper hour. Discounted Rate for Bell Gardens: $760 per hour Deputy City Engineer: $lU9per houc Discounted Rate for Bell Gardens: $752 per hour As -Needed Traffic Engineer: Hourly Rate per Hourly Rate Schedule The Traffic Engineer will beavailable torespond toany inquiries from the city byemail orphone calls during any business hours and attend any traffic commission meetings that the Director of Public Works may require. The discounted hourly rates for these services will be as follows:

CityTraffic Engineer: $169 per hour.

Deputy City Traffic Engineer: $161 per hour
Discounted Rate for Bell Gardens: $752 per hour
Discounted Rate for Bell Gardens: $745 per hour
Water Engineer: Hourly Rate per Hourly Rate Schedule
The Water Engineer will be available to provide engineering consultation on various city water matters on an as -needed basis.

The discounted hourly rates for these services will beasfollows:

Senior Water Engineer: $l7Uper hour. Discounted Rate for Bell Gardens: $758 per hour Water Engineer: $l5Bper hour. Discounted Rate for Bell Gardens: $742 per hour Development Engineer: Hourly Rate per Hourly Rate Schedule Services rnay include participation at rneetings, attendance at the Planning Commission rneetings, review of development plans orother assignments fromthe Community Development Department.

The discounted hourly rate for these services will beasfollows:

Development Engineer: $lU9per hour. Discounted Rate for Bell Gardens: $752 per hour Public Works Right ufWay Permit Management and Inspection: $ll3per hour (hourly rates) The utilities / public works permits, and inspection services will be provided at the following discounted rates:

Engineering Technician: $lQUper hour. Discounted Rate for Bell Gardens: $95 per hour Permit Inspector: $ll3per hour. Discounted Rate for Bell Gardens: $702 per hour Public Works Projects
Other public works studies, reviews and projects not listed here will be charged at hourly rates as listed in the Infrastructure EngineeoZQZZ ZQZ3Hourly Rate Schedule (attached).A|umpsum,not-to-exceed fee will beprovided atthe start ofeach task
ctueEngineers, aBowman company | Municipal Engin24(�ngServices | November 9,2CQ] 96

��=~o��� ����=0 ���°@_°���� (cont.)
� ����~~�~~~~�m m—.m.~m~~�� K.~~~~~��
�
Capital Improvement Projects: Percentage of the total cost of final contractconstruction Capital improvement design fees will be based on the estimated cost of construction. Once the project isdefined, the engineering tearn will estirnate the construction cost and, in accordance with the chart below, will set the design fee. After finalization of design and upon receiving formal bids for construction of the project, the actual design fee will be determined, and the engineering design fee will beadjusted toreflect the exact amount.

Construction costs will bethe average ofthree (]) lowest bids for the project. |fthere are only two (J)bids, the average oftwo (Z)bids will beused for construction cost.
' Construction cost less than $499,999 the design fee will be 8% of the construction cost. ' Construction cost $5QOQQQ $999,999the design fee will be7%ofthe construction cost. ' Construction cost $l,QQOQQQ 4,999,999the design fee will be6%ofthe construction cost. ' Construction cost over $5,000,000 the design fee will be 5% of the construction cost.

In addition to these percentages, Infrastructure Engineers fees for program rnanagernent, project rnanagernent and administration will be 4% of the construction cost, 2% of the project rnanagernent will be charged during design phase and the additional Z96will becharged during construction phase ofthe project. |naddition, funding managementwill bel.5%for local funds and Z5% for state and federally funded projects. Half ofthe fund managementwill becharged during the design phase and the other half will becharged during the construction phase ofthe project.

A program manager / project manager's role for every project in various stages of the project is as follows:

Budgeting stage.
' Identify the funding for the project that will meetthe funding eligibility. ' Obtain funding approval fromthe funding agency.
' Work with the City's Finance Department to clear the budgeting objectives. ges��
' Work with Public Works Director togenerate aconcise project scope. ' Work with the design group toget the project designed and ensure that the project will bewithin the time and budget established.
' Draft the staff report for the approval ofthe design.

RLddinaStage.
' Advertise the project for bids.
' Work with City Engineer toopen bids and provide bid analysis. ' Draft the staff report for approval of the lowest responsible and responsive bidder.

Construction stacLe.

Work with the construction manager to ensure the project objectives are attained. ' Oversee the construction process and work with funding agencies when necessary. ' Draft the staff report for completion ofthe project.
ctueEngineers, aBowman company | Municipal Engin24imgServices | November 9,2CQ] 97

��=~o��� ����=0 ���°@_°���� (cont.)
� ����~~�~~~~�m m—.m.~m~~�� K.~~~~~��
�
Notify the County of the final City acceptance of the project.

Construction Management and Inspection: Percentage of total construction cost Upon on receiving the bids for the construction of a capital irnprovernent project, the engineering tearn will prepare the fee for construction rnanagernent and inspection services in accordance with the following chart.The fee will be calculated based on average cost of the three (3) lowest bids and, if there are only two (2) bids, an average of two bids will be used.

Construction cost less than $499,999 the CM services 2.5% 1 inspection services 4.5% for a total fee of 7% of the construction cost.
' Construction cost $50lQQQ $999,999the CK8services Z.596+inspection services of3.5%for atotal fee of6%ofthe construction cost.

Construction cost $1,000,000 - $4,999,999 the CM Services fee of 2.5% 1 inspection services of 3% for a total fee of 5.5% of the construction cost.
' Construction cost over $5,000,000 the CM services fee will be 4.5% of the construction cost.

Labor compliance will be charged on an as -needed basis and based on actual hourly rates of $105 per hour per the Hourly Rate Schedule.

NPDES:Hourly rates
All NPE)ES services will be provide on as -needed bases at the following discounted rates:

Program Manager: $lUBper hour. Discounted Rate for BeMGardens: $757 per hour Engineering Associates: $l35per hour. Discounted Rate for BeMGardens: $722 per hour Inspector: $lQUper hour. Discounted Rate for BeMGardens: $95 per hour Other Services: Hourly rates nut'tu'exceedanegotiated lump sum Other fees will bebased onInfrastructure Engineers ZQZZ ZQZ3Hourly Rate Schedule attached tothis proposal.

Civil Engineering Plan Checks: 0596ufthe plan check fees, based unLos Angeles [uunty'slatest fee schedule and hourly rate. If the city uses its "City Fees" for public works projects, then civil engineering fees will be charged at 90% of those city fees.

Plan checkfees include first, second and third plan checks. Fourth and all subsequent plan checks will be at the plan checkers' hourly rate.The rate provided here is Infrastructure Engineers'discounted rates for the City of Bell Gardens only, due to our long-term relationship with the city. Expedited plan checks will be provided at 90% of the plan check fees. Fourth and subsequent plan checks will becharged atlJ5timesthe norma|hourly rate.

Plan Check Engineer: $l5Qper hour Discounted Rate for BeMGardens: $735 per hour Notes:

Land surveying, geotechnica| services, material testing and potholing for capital projects will be provided bysubconsu|tants.

The fee for these services will beanegotiated cost +l596.

Any other subconsultant services that rnight be needed will be charge at a negotiated cost 1 15%.

Hourly rates and the retainer fees are subject to increases at the annual Consurner Price Index for All Urban Consurners (CPI-U), Los Angeles area increase rates or a 5% increase, whichever is greater, effective July 1, 2024 and all subsequent years. ctueEngineers, aBowman company | Municipal Engin2&gServices | November 9,2CQ] 98

Cost and Pricing (cont.)

INFRASTRUCTURE
2022-2023 HOURLY RATE SCHEDULE ENGINEERS
(effective March 1, 2022) a Bowman company
Principal in Charge $238 Community evelomet— Fire Prevention Civil Engineefing/Traffic Engineering Environmental & Planning Fire Marshal $165 Project Manager
$185
Director
$195
Fire Investigator
$154
Principal Engineer
$180
Development Services Manager
$189
Fire Plans Examiner
$143
Senior Engineer
$170
Project Manager
$173
Senior Fire Inspector
$138
Senior Plan Check Engineer
$175
Planning Manager
Principal Planner
$167
$163
Fire Inspector
Counter Technician
$120
$93
Plan Check Engineer
g
Associate Engineer
$165
$155
Senior Planner
Associate Planner
$153
$139
Architectural Services
Assistant Engineer
$145
Assistant Planner
$129
Director
$200
Engineering Associate
$135
Planning Technician
$98
Studio Manager
$184
Engineering Assistant
$115
CEQA/NEPA Specialist
$175
Senior Project Manager/
$176
GIS Analyst
$150
Environmental Specialist
$170
Senior Architect
CAD Manager
$135
Senior Environmental Planner
$165
Project Manager/Project Architect
$155
CAD Designer
$110
Environmental Planner II
$155
Senior Job Captain
$126
CAD Technician
$100
Environmental Planner 1
$144
Job Captain
$105
Engineering Technician
$105
Environmental Technician
$100
Drafter
$90
Principal Traffic Engineer
$185
Municipal Engineering Support
ProgramManagement/Public Outreach
Senior Traffic Engineer
$170
Interim City Manager
$220
Program Director
$184
Traffic Engineer
$150
Assistant/Deputy City Manager
$197
Web Designer
$150
Water/Wastewater/NPDESCity
Engineer
City Traffic Engineer
$178
$169
Media Specialist
Program Coordinator
$145
$135
Senior Water Engineer
$167
Deputy City Engineer
$169
Photographer
$128
Water Engineer
$158
Deputy City Traffic Engineer
$161
Outreach Specialist
$125
Program Manager (NPDES)
$168
Plan Check Engineer
$178
Interpreter/Translator
$125
Inspector (NPDES)
$110
Plan Examiner
$155
Production Assistant
$85
Environmental Scientist
$105
CIP Manager
$178
Fund Administrator
$138
Surveying
Associate Engineer
Engineering Associate
$149
$142
Labor Compliance Coordinator
$105
Project Manager
$185
Engineering Assistant
$118
Administrative Clerical Services
Plan Checker
$162
Engineering Technician
$106
Organizer/Supervisor
$108
(Subdivision & Survey Document)
Building
Administrative Assistant
$90
Survey Analyst
$150
Building Official
$175
Clerk Typist
$80
Survey Crew (2-man)
$236
Plan Check Engineer
$165
Other Charges
Survey Crew
(2-man, prevailing wages)
$278
Landscape Plan Checker
$162
Delivery
$110
Senior Certified Access Specialist
$165
Mileage (Current federal guideline
Construction Management
Certified Access Specialist
$155
rate @ time of billing)/Mile
Construction Manager
$188
Plans Examiner
$145
Travel Cost+ 150/6
Resident Engineer
$188
Code Enforcement Manager
$145
Reimbursements Cost+ 15%
Scheduler/Controller
$163
Code Enforcement Officer
$127
Utilities Coordinator
$138
Senior Building Inspector
Building Inspector
$127
$120
Senior PW Observer/Inspector
$130
Grading Inspector
$120
Senior PW Observer/Ins ector
p
$191
Counter Technician
$10505
(prevailing wages)
PW ObserverAnspector
$113
PW ObserverAnspector
$159
(prevailing wages)
Additional billing classifications may be added to the above list throughout the year as new positions are created. The above schedule is for straight time. Overtime will be charged at 1.5 times. Sundays and Holidays are charged at 2.0 times the standard time. Deposition and court appearances will be charged at 1.5 times the listed billing rates. Hourly rates and the retainer fees are subject to increases at the annual Consumer Price Index for All Urban Consumers (CPI-U), Los Angeles County area increase rates or a 5% increase, whichever is greater, effective July 1, 2024, and all subsequent years. We will inform the city of the rate increase by April of each succeeding year.

Exhi afts�ructure Engineers, a Bowman company I Municipal Engin24:�ng Services I November 9, 2023 99

Additions or Exceptions

Additions or Exceptions

ADDITIONS OR EXCEPTIONS TO THE CITY'S REQUEST FOR PROPOSAL 1E has no additions or exceptions to the provisions and conditions of the city's standard professional services contract.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin24ing Services I November 9,2023 100

Pending Litigation

Pending Litigation
IE has not been involved in any substantiated complaints, litigation, legal proceedings, or investigations by a regulatory authority in the last five years.

Exhlafts�ructure Engineers, a Bowman company I Municipal Engin241ng Services I November 9,2023 101

Insurance

Insurance
AC7"RhIP CERTIFICATE OF LIABILITY INSURANCE

DATE(MM/DDVYYY)
07/06/2023
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

PRODUCER
NAME:

Klein Agency, LLC
PHONE
Ext: (410)832-7600 (A/C No (410)832-1849
ADDRESS: [email protected]
P.O. Box 219

INSURER(S) AFFORDING COVERAGE
NAIC #
Timonium MD 21094
INSURERA : Charter Oak Fire Insurance Cc
25615

INSURED
INSURER B : Travelers Property Casualty Co. of America
25674
Infrastructure Engineers, a Bowman Company
INSURER C : Berkley Insurance Company
3060 Saturn Street
INSURER D :

INSURER E
Suite 250
INSURER F:

Brea CA 92821
COVERAGES CERTIFICATE NUMBER: 22-23Infrastructure Engi REVISION NUMBER:

THIS IS TO CERTIFY THATTHE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TOTHE INSURED NAMEDABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAYBE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TOALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

INSR
LTR

TYPE OF INSURANCE
INSD
WVD

POLICY NUMBER

POLICY EFF

MM/DD/YYYY

POLICY EXP

MM/DD/YYYY
LIMITS

COMMERCIAL GENERAL LIABILITY

EACH OCCURRENCE
$ 1,000,000

CLAIMS -MADE FAOCCURPREMISES
Ea occurrence
$ 1,000,000
MED EXP (Any one person)
$ 10,000
X
Contractual Liability

PERSONAL & ADV INJU RY
$ 1,000,000
A
6306JO47645
08/31/2022
08/31/2023
GEN'LAGGREGATE LIMITAPPLIES PER:

GENERAL AGGREGATE
$ 2,000,000
POLICY ® PRO-

JECT LOC

PRODUCTS - COMP/OPAGG
$ 2,000,000
$
OTHER:

AUTOMOBILE

LIABILITY

COMBINED SINGLE LIMIT
Ea accident
$ 1,000,000
BODILY INJURY (Per person)
$

ANYAUTO
B

OWNED SCHEDULED

AUTOS ONLY AUTOS
8108TO20400
08/31/2022
08/31/2023
BODILY INJURY (Per accident)
$
1 PROPERTY DAMAGE
Per accident
$

HIRED NON -OWNED

AUTOS ONLY AUTOS ONLY
$

UMBRELLA LIAB
OCCUR

EACH OCCURRENCE
$ 25,000,000

AGGREGATE
$ 25,000,000
B

EXCESS LIAB
I

ICLAIMS-MADE
CUP6J395074
08/31/2022
08/31/2023
DED RETENTION $
$
B

WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY v/N
ANY PROP RIRlPARTN ER/EXECUTIVE
OFFICERlMEMBEMBER EXCLUDED?
(Mandatory in NH)
N/A
UB6J317115
08/31/2022
08/31/2023

PER OTH-

STATUTE ER
E.L. EACH ACCIDENT
$ 1,000,000
E.L. DISEASE - EA EMPLOYEE
$ 1,000,000
Ifyes, describe under
DESCRIPTION OF OPERATIONS below
E.L. DISEASE - POLICY LIMIT
$ 1,000,000
C
Primary Professional &Pollution Liab /
Excess Professional & Pollution Liability
AEC905795802/V3349C220101
08/31/2022
08/31/2023
Each Claim/Aggregate
Excess Each Claim/Aggr.
5,000,000
5,000,000
Total Limits:
10,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, maybe attached if more space is required) If required by an insured written contract, executed prior to any loss, the certificate holder is an Additional Insured on a primary and non-contributory basis under the General and Auto Liability Policies. If required by an insured written contract, executed prior to any loss, Waiver of Subrogation is provided for General, Auto, and Workers Compensation Policies. Umbrella Policy follows form over General, Auto, and Employer's Liability Policies. 30 day notice of cancellation, 10 day for non-payment.

CERTIFICATE HOLDER CANCELLATION

SHOULDANY OF THEABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN * Evidence of Coverage *
ACCORDANCE WITH THE POLICY PROVISIONS.

AUTHORIZED REPRESENTATIVE
��y
@ 1988-2015 ACORD CORPORATION. All rights reserved.

ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD Exhi afts�ructure Engineers, a Bowman company I Municipal Engin24tog Services I November 9, 2023 102

Appendix

Related Experience and Client Reference List
Client Contact

XIIIINNIMM
Former Director of Public Works
Client Contact
Cesar Roldan
Public Works Director
323.584.6274
[email protected]
Montebello Boulevard Widening Project
City of Montebello, CA
"2021 American Public Works Association Project of the Year" award winner.

Phase 11 of the Montebello Boulevard Bike Lane and Sidewalk Improvement project included design, preparation of PS&E for roadway improvements and widening, pavement rehabilitation, concrete improvements, sidewalk improvement, utility adjustments, ADA improvements, Class 11 bike lane, traffic signal improvements, pedestrian lighting, and landscaping, bioswales along center medians and irrigation improvements.

Address Team Members
1600 W. Beverly Boulevard Aidan Mousavi
Montebello, CA 90640 Shawnt Babakhanian
Schedule Shawn Mousavi
2017-2020
Slauson Congestion Relief Project
City of Huntington Pork, CA
Utilized Synchro modeling for signal and timing improvement. Upgraded traffic signal equipment, enhanced phasing operations, street widening, concrete improvements, coordination with Los Angeles county and various railroad agencies. The goal of the project was to study and design improvements along the Slauson corridor to increase capacity, reduce congestion and improve traffic flow. Design plans have been finalized.

Address Team Members
6550 Miles Avenue Aidan Mousavi
Huntington Park, CA 90255 Shawnt Babakhanian
Schedule Shawn Mousavi
90JUJI11111=1
Exhlafts�ructure Engineers, a Bowman company I Municipal Engin26ing Services I November 9,2023

Related Experience and Client Reference List (cont.)
Client Contact
Sam Gutierrez
Director of Public Works
626.960.4011
sg uttierrez@ba ldwi n pa rk.corn
Client Contact
Julian Lee
Director of Public Works
310.603.0220 ext. 201
[email protected]
Downtown Beautification Project
City of Baldwin Pork, CA
Replaced existing streetlight and traffic signal infrastructure with new decorative infrastructure designed to identify and create visual points of interest that highlight and activate the Baldwin Park community. Branding included streetscape enhancements and decorative poles designed to tie-in with the new infrastructure including, but not limited to, decorative pavement in the parkway and crosswalks, entry monument signs in the center medians, and installation of a public art centerpiece on Ramona Boulevard.

← All documents from this meeting