TO: Honorable Mayor and Members of the City Council
FROM: Jeffrey L. Stewart, City Manager
Tae Rhee, Director of Finance/City Treasurer
SUBJECT: Consideration and possible action to approve the Development Impact Fee Annual Report for Fiscal Year 2021-22 pursuant to Government Code § 66006.

DATE: November 28, 2022

EXECUTIVE SUMMARY
Pursuant to BMC Chapter 3.24 (Ordinance No. 1117) and Chapter 3.36 (Ordinance No. 1118), the City has been collecting the Public Facilities and Park Facilities Fees, respectively, since October 2006. Section 8.a of the Resolution No. 11-22 directs the City Manager to prepare the required annual report for these fees. Government Code § 66006 requires an annual report on these fees containing certain financial and other information for the City Council and public.

As supplemental information, the annual report incorporates similar data on the Public Arts Fee (BMC Chapter 3.32; Ordinance No. 1098). The Public Arts Fee has a unique provision in that any developer can choose to install public art on the property that is being developed instead of paying a fee to the City. Such installation of public art by a developer requires City Council approval.

RECOMMENDATION TO CITY COUNCIL
1) Approve the Development Impact Fee Annual Report for Fiscal Year 2021-22 pursuant to Government Code § 66006; or
2)Alternatively, discuss and take other action related to this item.

FISCAL IMPACT
None. The Fund balances as of June 30, 2022, were as follows:

Park Facilities Fund $ 1,283,694
Public Facilities Fund 162,345
Public Arts Fund 311,350
- 1 -

Staff Report – Development Impact Fee Annual and Five-Year Reports November 28, 2022

Page 2 of 2 ends

PUBLIC NOTICE

On October 31, 2022, a Public Notice was posted at City Hall, Bellflower Substation, Caruthers Park, Thompson Park, and Simms Park. In addition, Southern California Gas Company and Southern California Edison were also notified on that same day pursuant to their written request on file with the City Clerk’s Office.

DISCUSSION

The City collects public facilities and park facilities fees, which are fees associated with development projects. Government Code Section 66006 requires the City to prepare an annual report that describes certain information about the fees, such as the amount of fees collected, public improvements for which the fees were expended, fund balance, and other information. In addition, Government Code Section 66001 requires the City to provide a report and make findings every five years regarding unexpended fund fees. The next five-year report is required for Fiscal Year 2025-2026.

City staff has prepared the attached annual report and recommends City Council receipt and approval.

ATTACHMENTS

Public Notice ................................................................................................................... 3 Development Impact Fee Annual Report for Fiscal Year 2021-22 .................................. 4

- 2 -

CITY OF BELLFLOWER

PUBLIC NOTICE

DEVELOPMENT IMPACT FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Pursuant to Ordinance Nos. 1117 and 1118, the City has been collecting public facilities and park facilities fees since October 2006, and is required to report annually certain information to the City Council and public in compliance with the Government Code § 66006.

The attached annual report which has been prepared pursuant to state law is currently available at the Finance Department, City Hall 2nd Floor, 16600 Civic Center Drive, Bellflower, CA 90706. The report will be presented to the City Council for review at a public meeting on Monday, November 28, 2022, at 7:00 p.m., at the Council Chambers, City Hall 1st Floor, 16600 Civic Center Drive, Bellflower, CA 90706. The public is welcome to attend this Council Meeting and provide any relevant comments to the Council on the report.

If you have any questions regarding the reports in advance of the Council Meeting, please contact the Finance Department, 16600 Civic Center Drive, Bellflower, CA 90706, or call (562) 804-1424, extension 2239.

By: Tae Rhee, Finance Director/City Treasurer
Date: October 31, 2022

- 3 -

Development Impact Fee
Annual Report
(Fiscal Year 2021-22)

- 4 -

CITY OF BELLFLOWER

PARK FACILITIES FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Page 1 of 5 ends

This annual report section has been prepared pursuant to the requirements of Government Code Section 66006.

(A) Brief description of the type of fee in the account or fund.

Pursuant to BMC Chapter 3.36 (Ordinance No. 1118), the Park Facilities Fee is collected for the development of new and rehabilitation of existing neighborhood or community parks and recreational facilities within the City.

The objective of the Park Facilities Fee is to ensure that new development pays the capital costs associated with population growth which increases the demand for municipal services and park facilities.

(B) Amount of the fee.

A fee may be paid in lieu of or in addition to land dedication. The amount of such fee is determined by multiplying the number of acres of land which would otherwise be required to be dedicated by the fair market value per acre of the land within the proposed residential development.

Single Family Per Unit $21,839
Multi-Family Per Unit $18,288
ADUs larger than 750 s.f. Fee proportional to primary unit

The amount of land to be dedicated is equal to .0025 acres per person multiplied by the number of persons added to the City’s population by the new residential development.

The number of persons added to the City’s population by the new residential development is determined by multiplying the number of new dwelling units being developed by the density factor determined.

(C) Beginning and ending balance of the account or fund. (D) Amount of the fees collected and the interest earned.

No.

Fiscal
Year
Beginning
Balance
Park Fac.

Fees
Collected
Interest
earned
Other
Revenue

Expenditures

Transfers
Ending
Balance
16 2021-22 $ 796,206 $ 495,634 $ 5,089 $ - $ 13,235 $ - $1,283,694 15 2020-21 $ 669,479 $ 344,985 $ 3,562 $ - $ 221,820 $ - $ 796,206 14 2019-20 $ 677,421 $ 210,278 $ 15,253 $ - $ 233,473 $ - $ 669,479 13 2018-19 $ 477,879 $ 335,857 $ 12,874 $ - $ 149,189 $ - $ 677,421 12 2017-18 $ 300,054 $ 331,944 $ 7,245 $ - $ 161,364 $ - $ 477,879 11 2016-17 $ 230,946 $ 132,676 $ 3,651 $ - $ 67,219 $ - $ 300,054 10 2015-16 $ 31,741 $ 242,211 $ 378 $ 1,724 $ 45,108 $ - $ 230,946 9 2014-15 $ 19,935 $ 50,284 $ 345 $ - $ 38,823 $ - $ 31,741 - 5 -

CITY OF BELLFLOWER

PARK FACILITIES FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Page 2 of 5 ends

No.

Fiscal
Year
Beginning
Balance
Park Fac.

Fees
Collected
Interest
earned
Other
Revenue

Expenditures

Transfers
Ending
Balance
8 2013-14 $ 2,917 $ 63,505 $ 382 $ 500 $ 47,369 $ - $ 19,935 7 2012-13 $ 129,260 $ 19,631 $ 513 $ - $ 146,487 $ - $ 2,917 6 2011-12 $ 176,347 $ 3,949 $ 1,833 $ - $ 52,869 $ - $ 129,260 5 2010-11 $ 156,155 $ 25,533 $ 1,527 $ - $ 6,868 $ - $ 176,347 4 2009-10 $ 127,673 $ 52,548 $ 1,736 $ - $ 25,802 $ - $ 156,155 3 2008-09 $ 143,863 $ 63,600 $ 4,046 $ - $ 83,836 $ - $ 127,673 2 2007-08 $ 54,819 $ 84,789 $ 4,255 $ - $ - $ - $ 143,863 1 2006-07 $ - $ 53,941 $ 878 $ - $ - $ - $ 54,819 Cumulative $ - $2,511,365 $ 63,567 $ 2,224 $ 1,293,462 $ - $1,283,694 (E) Identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the total percentage of the cost of the public improvement that was funded with fees.

PROJECTS IN PROGRESS:

Butterfly Garden Project
Park Facilities Fee 2021-2022 $ 2,400 3%
Grants Projects Capital Projects Fund 2018-2022 74,790 97% Total $ 77,190 100%

Thompson Park Improvements – Playground Replacement
Park Facilities Fee 2021-2022 $ 3,841 100%
Total $ 3,841 100%

Constitution Park Improvements
Park Facilities Fee 2021-2022 $ 6,994 100%
Total $ 6,994 100%

COMPLETED PROJECTS:

Caruthers Park Improvements / Tubular Steel Fence and Resurfacing of Courts Park Facilities Fee 2020-2021 $ 22,604 24%
Park Facilities Fee 2019-2020 58,204 61%
Grants Projects Capital Projects Fund 2020-2021 14,109 15% Total $ 94,917 100%

- 6 -

CITY OF BELLFLOWER

PARK FACILITIES FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Page 3 of 5 ends

Veterans Memorial Enhancements
Park Facilities Fee 2020-2021 $ 89,566 30%
Public Art Fee 2020-2021 179,099 61%
Public Art Fee 2019-2020 26,294 9%
Total $ 294,959 100%

Constitution Park Improvements
Park Facilities Fee 2020-2021 $ 109,650 55%
General Fund 2020-2021 86,330 43%
Park Facilities Fee 2019-2020 4,550 2%
Total $ 200,530 100%

Simms Park Improvements
Park Facilities Fee 2019-2020 $ 141,287 100%

Aquatic Center Improvements
Park Facilities Fee 2019-2020 $ 29,432 2%
Park Facilities Fee 2017-2019 300,053 16%
General Fund 2017-2019 289,414 15%
Public Projects Fund 2018-2020 1,268,271 67%
Total $ 1,887,170 100%

Coke Avenue Park (Planning)
Park Facilities Fee 2015-2018 $ 18,295 100%

Simms Park Fitness Center / Trail
Park Facilities Fee 2015-2017 $ 63,873 15%
General Fund 2015-2017 53,831 12%
L.A. County Proposition A Grant 2015-2017 324,822 73% Total $ 442,526 100%

Simms Park Playground
Park Facilities Fee 2014-2016 $ 20,993 19%
Private Contribution (Est. Property & Cash) 2015-2016 91,724 81% Total $ 112,717 100%

Caruthers Park Playground / Fitness Center
Park Facilities Fee 2015-2016 $ 27,567 32%
General Fund 2015-2016 16,001 18%
Kaiser Permanente 2015-2016 43,846 50%
Total $ 87,414 100%

Zinn Park and Trail Improvements
Park Facilities Fee 2013-2016 $ 22,230 8%
L.A. County Proposition A Grant 2013-2015 251,869 92% Total $ 274,099 100%
- 7 -

CITY OF BELLFLOWER

PARK FACILITIES FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Page 4 of 5 ends

Flora Vista Dog Park Construction
Park Facilities Fee 2012-2015 $ 55,836 16%
Economic Development Fund 2014-2015 296,533 84%
Central Basin MWD Grant 2013-2014 500 -
Total $ 352,869 100%
Palm Street Park Construction
Park Facilities Fee 2008-2013 $ 313,862 15%
Rivers & Mountains Conservancy Grant 2012-2013 1,730,916 83% Redevelopment Funds 2006-2011 50,862 2%
Total $ 2,095,640 100%
Note: The percentage details may not total 100% due to rounding. (F)Identification of an approximate date by which the construction of the public improvement will commence if the local agency determines that sufficient funds have been collected to complete financing on an incomplete public improvement, as identified in paragraph (2) of subdivision (a) of Section 66001, and the public improvement remains incomplete.

For the projects that were in-progress in FY 2021-2022, the following amounts have been allocated in FY 2022-2023:

Butterfly Garden Construction (approx. start date October 2022) $1,227,640 Thompson Park Improvements (approx. start date February 2023) $ 356,083 Constitution Park Improvements (approx. start date March 2023) $ 581,800 (G) Description of each interfund transfer or loan made from the account or fund, including the public improvement on which the transferred or loaned fees will be expended, and, in the case of an interfund loan, the date on which the loan will be repaid, and the rate of interest that the account or fund will receive on the loan.

There were no interfund transfers or loans.
(H) Amount of refunds made pursuant to subdivision (e) of Section 66001 (relating to the unexpended portion of the fees) and any allocations pursuant to subdivision (f) of Section 66001 (relating to the administrative costs of refunding the fees).

There were no reportable refunds nor allocations for some other purpose for which fees were collected.
- 8 -

CITY OF BELLFLOWER

PARK FACILITIES FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Page 5 of 5 ends

Summary of Other Information from August 14, 2006 Staff Report:

Park Facilities Fee Applicable to:

New Single Family
Replacement Single Family
Room Addition
Second Unit
Third (or More) Units
Multi-Family
Commercial (including Institutional)
Office
Industrial

Yes, if more than one unit
No
No
Yes @ 50%
Yes
Yes
No
No
No
Permitted Uses Acquisition of new and rehabilitation of existing park and recreation facilities
Prohibited Uses Operation and maintenance
Property Dedication In Lieu of Fee Yes
Other Exemptions Development restricted to low & moderate income and senior housing (fee payable when
restriction lifted)
Factors Used to Determine Fee 1. Number of Dwelling Units

2. Density Factor - per Census

3. General Plan Parkland Requirement

4. Appraised value of land within development
Adjustment Factors 1. Residential Density (Census)

2. Appraised Value

- 9 -

CITY OF BELLFLOWER

PUBLIC FACILITIES FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Page 1 of 3 ends

This annual report section has been prepared pursuant to the requirements of Government Code Section 66006.

(A) Brief description of the type of fee in the account or fund.

Pursuant to BMC Chapter 3.24 (Ordinance No. 1117), the Public Facilities Fee is collected to pay for land acquisition for, and design, engineering, and construction of, the public facilities designated in the City Council resolution and reasonable costs of related outside consultant studies.

The objective of the Public Facilities Fee is to ensure that new development pays the capital costs associated with population growth which increases the demand for municipal services and public facilities.

(B) Amount of the fee.

1. Single Family Development $1,416 per dwelling unit

2. Multi-Family Development $1,185 per dwelling unit

3. Commercial Development $0.188 per square foot of building

4. Office Development $0.227 per square foot of building

5. Industrial Development $0.092 per square foot of building

6. ADUs larger than 750 s.f. Fee proportional to primary unit

(C) Beginning and ending balance of the account or fund. (D) Amount of the fees collected and the interest earned.

No.

Fiscal
Year
Beginning
Balance
Public
Fac. Fees
Collected
Interest
earned

Expenditures

Transfers
Ending
Balance
16 2021-22 $ 27,935 $ 133,843 $ 567 $ - $ - $ 162,345 15 2020-21 $ - $ 27,875 $ 60 $ - $ - $ 27,935 14 2019-20 $ 54,485 $ 20,285 $ 1,200 $ 75,970 $ - $ - 13 2018-19 $ - $ 53,865 $ 620 $ - $ - $ 54,485 12 2017-18 $ 54,360 $ 43,912 $ 688 $ 98,960 $ - $ - 11 2016-17 $ 136,734 $ 16,296 $ 1,330 $ 100,000 $ - $ 54,360 10 2015-16 $ 101,679 $ 34,122 $ 933 $ - $ - $ 136,734 9 2014-15 $ 89,930 $ 10,978 $ 771 $ - $ - $ 101,679 8 2013-14 $ 70,644 $ 18,561 $ 725 $ - $ - $ 89,930 7 2012-13 $ 63,702 $ 6,266 $ 676 $ - $ - $ 70,644 6 2011-12 $ 57,028 $ 5,993 $ 681 $ - $ - $ 63,702 5 2010-11 $ 49,660 $ 6,889 $ 479 $ - $ - $ 57,028 4 2009-10 $ 41,304 $ 7,845 $ 511 $ - $ - $ 49,660 - 10 -

CITY OF BELLFLOWER

PUBLIC FACILITIES FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Page 2 of 3 ends

No.

Fiscal
Year
Beginning
Balance
Public
Fac. Fees
Collected
Interest
earned

Expenditures

Transfers
Ending
Balance
3 2008-09 $ 32,351 $ 8,001 $ 952 $ - $ - $ 41,304 2 2007-08 $ 8,853 $ 22,470 $ 1,028 $ - $ - $ 32,351 1 2006-07 $ - $ 8,757 $ 96 $ - $ - $ 8,853 Cumulative $ - $ 425,958 $ 11,317 $ 274,930 $ - $ 162,345

(E) Identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the total percentage of the cost of the public improvement that was funded with fees.

The Mayne Events Center and Fire Museum Expenditures Public Facilities Fee 2016-2020 274,930 2%
Economic Development and General Funds 2013-2019 8,063,351 73% Lease Financing 2017-2018 200,000 2%
Proceeds from Sale of Property to L.A.

County Fire Museum Association 2016-2018 650,000 6% Public Projects Fund 2017-2020 1,866,661 17%
Total $ 11,054,942 100%
(F) Identification of an approximate date by which the construction of the public improvement will commence if the local agency determines that sufficient funds have been collected to complete financing on an incomplete public improvement, as identified in paragraph (2) of subdivision (a) of Section 66001, and the public improvement remains incomplete.

There were no public improvements that remained incomplete. The remaining fund balance may be proposed to be used towards the construction of Public Works office building.

(G) Description of each interfund transfer or loan made from the account or fund, including the public improvement on which the transferred or loaned fees will be expended, and, in the case of an interfund loan, the date on which the loan will be repaid, and the rate of interest that the account or fund will receive on the loan.

There were no interfund transfers or loans made from the account or fund.

(H) Amount of refunds made pursuant to subdivision (e) of Section 66001 (relating to the unexpended portion of the fees) and any allocations pursuant to subdivision (f) of Section 66001 (relating to the administrative costs of refunding the fees).

There were no reportable refunds nor allocations for some other purpose for which fees were collected.
- 11 -

CITY OF BELLFLOWER

PUBLIC FACILITIES FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Page 3 of 3 ends

Summary of Other Information from August 14, 2006 Staff Report:

Public Facilities Fee Applicable to:

New Single Family
Replacement Single Family
Room Addition
Second Unit
Third (or More) Units
Multi-Family
Commercial (including Institutional)
Office
Industrial

Yes
No (if sq ft increase <50%)
No
Yes
Yes
Yes
Yes
Yes
Yes
Permitted Uses Land or property acquisition, construction and expansion for specified public facilities (i.e., City
Hall, Public Works Yard, City storage facilities,
and alternative facilities for similar uses.)
Prohibited Uses Operation and maintenance
Property Dedication In Lieu of Fee Credit for Facilities Installed Other Exemptions 1. Alteration/addition to existing residential structure, except addition of dwelling unit.

2. Replacement of existing residential structure
without adding dwelling units.

3. Replacement of existing non-residential
structure with no additional increase of area.

Factors Used to Determine Fee 1. Facility Standard
a. Cost of Construction
b. Cost of Land

2. Density Factor
a. Residential – per Census or DOF estimate

b. Non-Residential – per SCAG Study

3. Admin Fee – per study
Adjustment Factors 1. Residential Density (Census or DOF Estimate)

2. Cost of Construction

3. Cost of Land

- 12 -

CITY OF BELLFLOWER

SUPPLEMENTAL INFORMATION

PUBLIC ARTS FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Page 1 of 4 ends

This report has been prepared as supplemental information to the annual report prepared pursuant to the requirements of Government Code Section 66006.

(A) Brief description of the type of fee in the account or fund.

Pursuant to BMC Chapter 3.32 (Ordinance No. 1098), the Public Arts Fee collected can be used to provide works of art in public places in order to promote the visual arts in the City of Bellflower by creating a collection of permanent outdoor art work by recognized artists throughout the City, to be of public benefit, and to present the community with a variety of art work styles and themes, all of the highest possible quality.

(B) Amount of the fee.

1% of applicable project costs.

(C) Beginning and ending balance of the account or fund. (D) Amount of the fees collected and the interest earned.

No.

Fiscal
Year
Beginning
Balance
Public Arts
Fee
Collected
Interest
Earned /
Other

Expenditures Transfers
Ending
Balance 17 2021-22 $ 120,858 $ 196,446 $ 914 $ 6,868 $ - $ 311,350 16 2020-21 $ 275,672 $ 23,252 $ 1,033 $ 179,099 $ - $ 120,858 15 2019-20 $ 296,109 $ 7,332 $ 5,603 $ 33,372 $ - $ 275,672 14 2018-19 $ 254,490 $ 35,230 $ 6,389 $ - $ - $ 296,109 13 2017-18 $ 186,206 $ 65,110 $ 3,174 $ - $ - $ 254,490 12 2016-17 $ 163,112 $ 21,053 $ 2,041 $ - $ - $ 186,206 11 2015-16 $ 62,012 $ 100,440 $ 660 $ - $ - $ 163,112 10 2014-15 $ 38,927 $ 41,759 $ 522 $ 19,196 $ - $ 62,012 9 2013-14 $ 38,895 $ 22,850 $ 447 $ 23,265 $ - $ 38,927 8 2012-13 $ (8,078) $ 56,762 $ 219 $ 10,008 $ - $ 38,895 7 2011-12 $ (51,578) $ 43,500 $ - $ - $ - $ (8,078) 6 2010-11 $ (62,578) $ 11,000 $ - /
$ 2,000
$ 2,000 $ - $ (51,578)
5 2009-10 $ 145,725 $ (9,500) $ 619 $ 199,422 $ - $ (62,578) 4 2008-09 $ 110,035 $ 37,500 $ 3,190 $ 5,000 $ - $ 145,725 3 2007-08 $ 70,252 $ 35,744 $ 4,039 $ - $ - $ 110,035 2 2006-07 $ 30,103 $ 37,750 $ 2,399 $ - $ - $ 70,252 1 2005-06 $ - $ 29,941 $ 162 $ - $ - $ 30,103 - 13 -

CITY OF BELLFLOWER

SUPPLEMENTAL INFORMATION

PUBLIC ARTS FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Page 2 of 4 ends

No.

Fiscal
Year
Beginning
Balance
Public Arts
Fee
Collected
Interest
Earned /
Other

Expenditures Transfers
Ending
Balance Cumulative $ - $ 756,169 $ 33,411 $ 478,230 $ - $ 311,350

(E) Identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the total percentage of the cost of the public improvement that was funded with fees.

Expenditures
Thru 2021-22
% of Costs
Funded with Fees
PROJECT IN-PROGRESS:

Bellflower Gateway Sign $ 6,700 100%

COMPLETED PROJECTS:

Veterans Memorial* 205,393 70%
New Hope Temporary Shelter Mural 7,078 100% Journey to Market 108,000 100%
Belle the Cow 106,430 100%
Colored StreetPrint/
16922 Bellflower Blvd (Fronk’s/Café Camellia) 23,265 100% Gateway Arch 16,231 100%
Mural/Breezeway/
16700 Bellflower Blvd (Belmont Court) 2,965 100% Gas Pump Utility Box 2,000 100%
Total Costs Funded with Fees $ 478,062

*The remaining 30% or $89,566 of the Veterans Memorial Project was funded with Park Facilities Fees.

Expenditures
Thru 2021-22
% of Costs
Funded with Fees
Veterans Memorial Maintenance $ 168 100% Total Costs Funded with Fees $ 168

(F) Identification of an approximate date by which the construction of the public improvement will commence if the local agency determines that sufficient funds have been collected to complete financing on an incomplete public improvement, as identified in paragraph (2) of subdivision (a) of Section 66001, and the public improvement remains incomplete.
- 14 -

CITY OF BELLFLOWER

SUPPLEMENTAL INFORMATION

PUBLIC ARTS FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Page 3 of 4 ends

Bellflower Gateway Sign (approximate project
commencement date: January 2023) Estimated Cost: $ 494,000

(G) Description of each interfund transfer or loan made from the account or fund, including the public improvement on which the transferred or loaned fees will be expended, and, in the case of an interfund loan, the date on which the loan will be repaid, and the rate of interest that the account or fund will receive on the loan.

There were no interfund transfers or loans.

(H) Amount of refunds made pursuant to subdivision (e) of Section 66001 (relating to the unexpended portion of the fees) and any allocations pursuant to subdivision (f) of Section 66001 (relating to the administrative costs of refunding the fees).

There were no reportable refunds nor allocations for some other purpose for which fees were collected.

Other Information Regarding the Public Arts Fee:

3.32.030 Projects Subject to the Public Arts Ordinance.

A. The requirements of this chapter shall apply to the following activities:

1. All capital improvement projects where the project cost exceeds two hundred and fifty thousand dollars ($250,000.00);

2. All commercial/industrial development projects where the project cost exceeds two hundred and fifty thousand dollars ($250,000.00); and

3. All residential projects of more than two (2) lots or units, including single-family residential structures, condominiums, apartments, townhouses or other dwelling units, where the project cost exceeds five hundred thousand dollars ($500,000.00).

B. Notwithstanding the foregoing, the requirements of this chapter shall not apply to the following activities:

1. Any project which consists solely of the reconstruction of structures which have been damaged by fire, flood, wind, earthquake or other calamity;

2. Any project constructed by a government agency other than the City or the Bellflower Redevelopment Agency or which is constructed on property exempt from taxation pursuant to California Revenue and Taxation Code Section 214; and

3. Single and multi-family residential remodeling.
- 15 -

CITY OF BELLFLOWER

SUPPLEMENTAL INFORMATION

PUBLIC ARTS FEE ANNUAL REPORT
(FISCAL YEAR 2021-22)

Page 4 of 4 ends

3.32.040 Requirement to Provide Art Work or Pay In-Lieu Contribution.

W hen a project is subject to the requirements of this chapter, the applicant shall provide public art by complying with one (1) of the following provisions. The choice of compliance methods shall be within the sole discretion of the applicant.

A.Acquiring and Installing Art. The project applicant shall acquire and install art work in a public place on or in the vicinity of the project site, as approved by the City Council pursuant to this chapter. The cost or value of such work shall equal or exceed one percent (1%) of the project cost.

B.In-Lieu Contribution. In-lieu of acquiring and installing art work, the project applicant may contribute an amount equal to one percent (1%) of the project cost to the Public Arts Fund. - 16 -