14-G
TO: Honorable Mayor and Members of the City Council

ATTENTION: Jeffrey L. Stewart, City Manager

FROM: Len Gorecki, Assistant City Manager/Director of Public Works

SUBJECT: Consideration and possible action to adopt Resolution No. 23-27 – A Resolution approving the Plans and Specifications for the traffic signal modification on Bellflower Boulevard at Park Street (Specifications No. 21/22-02), pursuant to Government
Code §830.6, establishing a project payment account; and authorizing solicitation of bids.

DATE: August 14, 2023

EXECUTIVE SUMMARY

This action would approve the Plans and Specifications, preserve the City’s right to assert design immunity to any claim for damages arising from the design, and authorize the Public Works Department to advertise for bids for the traffic signal modification on Bellflower Boulevard at Park Street (Specifications No. 21/22-02). The award of a contract will be brought before the City Council at a later date for approval.

RECOMMENDATION TO CITY COUNCIL

1) Adopt Resolution No. 23-27; or

2) Alternatively, discuss and take other action related to this item.

FISCAL IMPACT

The Engineer’s estimate of cost plus contingency to perform the work under Specifications No. 22/23-04 is $480,000. Funds are budgeted in Account Nos. 115-47148-9000 (Measure M), 125-47148-9000 (Measure R),135-47148- 9000 (Prop C) and 140-47148-9000 (Gas Tax).

DISCUSSION

This project will be for the modification of the existing traffic signal on Bellflower Boulevard at Park Street. The design and technical specifications for the traffic signal modification at this location have been prepared by Hartzog & Crabill, Inc. Upon City Council approval of the Plans and Specifications for this project, staff will solicit bids for the construction of the improvements.
-1-

Staff Report – Approval of Plans and Specifications for the Traffic Signal Modification on Bellflower Boulevard at Park Street, Spec. No. 21/22-02 August 14, 2023

Page 2 of 2 ends

CEQA

Pursuant to the California Environmental Quality Act (CEQA) (Public Resources Code §§ 21000, et seq.) and CEQA Guidelines (California Code of Regulations, Title 14, §§ 15000, et seq.), the City conducted an environmental assessment. Based on the environmental assessment, the project was determined to be categorically exempt pursuant to CEQA Guidelines § 15303 (Class 3 - New Construction or Conversion of Small Structures).

ATTACHMENTS:

Resolution No. 23-27....................................................................................................... 3 Plans & Specifications ..................................................................................................... 5

-2-

Page 1 of 2 ends

CITY OF BELLFLOWER

RESOLUTION NO. 23-27

A RESOLUTION APPROVING THE PLANS AND

SPECIFICATIONS FOR THE TRAFFIC SIGNAL

MODIFICATION ON BELLFLOWER BOULEVARD AT
PARK STREET (SPECIFICATIONS NO. 21/22-02)
PURSUANT TO GOVERNMENT CODE §830.6,
ESTABLISHING A PROJECT PAYMENT ACCOUNT; AND

AUTHORIZING SOLICITATION OF BIDS

THE CITY COUNCIL RESOLVES AS FOLLOWS:

SECTION 1. The City Council finds and declares as follows:

A. Public Works Department prepared the plans and specifications for the Traffic Signal modification on Bellflower Boulevard at Park Street (“Project”);

B. The Director of Public Works reviewed the completed Plans and Specifications for the Project and agrees that the plans and specifications are complete and the Project may be completed;

C. The City Council wishes to obtain the immunities set forth in Government Code §830.6 with regard to the Plans and
Specifications and completion of the Project; and

D. The City reviewed the project’s environmental impacts under the California Environmental Quality Act (CEQA) (Public Resources Code §§ 21000, et seq.) and CEQA Guidelines (California Code of Regulations, Title 14 §§ 15000, et seq.). The Project is categorically exempt pursuant to CEQA Guidelines § 15303 (Class 3 – New Construction or Conversion of Small Structures).

SECTION 2. Design Immunity; Authorization.

A. The Plans and Specifications for the Project are determined to be consistent with the City’s standards and are approved.

B. The Plans and Specifications approval set forth in this Resolution occurred before actual work on the Project construction commenced.

C. The approval granted by this Resolution conforms to the City’s General Plan.

D. The Director of Public Works, or designee, is authorized to act on the City’s behalf in approving any alterations or modifications of the Plans and Specifications approved by this Resolution.

-3-

City of Bellflower
Resolution No. 23-27

Page 2 of 2 ends

E. The approval and authorization granted by this Resolution is intended to avail the City of the immunities set forth in Government Code §830.6.

F. The City Manager, or designee, may solicit bids for the Project in accordance with applicable law.

SECTION 3. Project Payment Account. For purposes of the Contract Documents administering the Project, the City Council directs the City Manager, or designee, to establish a fund containing sufficient monies from the current fiscal year budget to pay for the Project (“Project Payment Account”). The Project Payment Account is the sole source of funds available for the Contract Sum, as defined in the Contract Documents administering the Project.

SECTION 4. If any part of this Resolution or its application is deemed invalid by a court of competent jurisdiction, the City Council intends that such invalidity will not affect the effectiveness of the remaining provisions or applications and, to this end, the provisions of this Resolution are severable.

SECTION 5. Electronic Signatures. This Resolution may be executed with electronic signatures in accordance with Government Code 16.5 Such electronic signatures will be treated in all respects as having the same effect as an original signature.

SECTION 6. The Mayor, or presiding officer, is hereby authorized to affix his signature to this Resolution signifying its adoption by the City Council of the City of Bellflower and the City Clerk, or her duly appointed deputy, shall attest thereto.

SECTION 7. This Resolution will become effective immediately upon adoption.

PASSED, APPROVED, AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF BELLFLOWER ON THIS 14th DAY OF AUGUST 2023.

____________________________
Sonny R. Santa Ines, Mayor
ATTEST:

_______________________________
Mayra Ochiqui, City Clerk

APPROVED AS TO FORM:

________________________________
Karl H. Berger, City Attorney
-4-

CITY OF BELLFLOWER

BELLFLOWER, CALIFORNIA

PLANS

SPECIFICATIONS

AND CONTRACT DOCUMENTS

FOR THE

TRAFFIC SIGNAL MODIFICATION ON BELLFLOWER BOULEVARD AT

PARK STREET

SPECIFICATIONS NO. 21/22-02

PREPARED BY:

CITY OF BELLFLOWER

PUBLIC WORKS DEPARTMENT
16600 CIVIC CENTER DRIVE
BELLFLOWER, CALIFORNIA 90706
(562) 804-1424

For questions regarding these Bid Specifications
or project, please contact:

Project Manager: Jerry Stock, City Engineer
(562) 804-1424, ext. 2218

BIDS DUE: Wednesday, September 13, 2023 at 11:30 AM

These plans and specifications are the exclusive property of the City of Bellflower and shall not be used in any manner without prior consent of the City of Bellflower. Any reuse of these plans and specifications by others shall be at other’s sole risk and without liability to the City of Bellflower.

-5-

CITY OF BELLFLOWER

TRAFFIC SIGNAL MODIFICATION ON BELLFLOWER BOULEVARD AT

PARK STREET

SPECIFICATIONS NO. 21/22-02

TABLE OF CONTENTS

SECTION PAGE

NOTICE INVITING SEALED BIDS ............................................................................. N-1

BIDDING INSTRUCTIONS .......................................................................................... I-1

BID DOCUMENTS (All Bid Documents must be submitted by bid date) Bid ................................................................................................................................ B-1 Bidders General Information ........................................................................................ B-2 Bidder’s Statement of Past Contract Disqualifications ................................................. B-3 Insurance Requirements .............................................................................................. B-4 List of Subcontractors ................................................................................................... B-6 Project Bid Sheet ......................................................................................................... B-7 Bid Bond ....................................................................................................................... B-8 Non Collusion Declaration ............................................................................................ B-9

CONTRACT DOCUMENTS
Agreement ................................................................................................................... C-1 Faithful Performance Bond ...................................................................................... FPB-1 Labor and Materials Bond .................................................................................... L&MB-1 Worker’s Compensation Insurance Certificate ......................................................... WC-1 Declaration of Sufficiency of Funds……………………………………………………..DSF-1

GUARANTY ................................................................................................................ G-1

STANDARD SPECIFICATIONS ................................................................................ SS-1 PCC § 9204 .................................................................................................... ATTACHED

TECHNICAL PROVISIONS ....................................................................................... TP-1 -6-

N-1

NOTICE INVITING SEALED BIDS

FOR THE TRAFFIC SIGNAL MODIFICATION ON BELLFLOWER BOULEVARD AT

PARK STREET

IN THE CITY OF BELLFLOWER
SPECIFICATIONS NO. 21/22-02

The City of Bellflower is accepting sealed bids in the City Clerk’s office, 16600 Civic Center Drive, Bellflower, CA 90706, until 11:30 a.m. on:

WEDNESDAY, SEPTEMBER 13, 2023

at which time they will be publicly opened. Each bid must be accompanied by a certified or cashier’s check or bidder’s bond payable to the order of the City of Bellflower or cash for an amount not less than ten percent (10%) of the bid price submitted, and the check, bond, or cash deposit of the successful bidder shall be forfeited to the City if such bidder fails to enter into the contract to perform the work within ten (10) days after written notice of award. Bids will not be accepted after that time.

As described in the Bidding Documents, the bids are for a public works project (“Project”) which consists of a Traffic Signal Modification on Bellflower Boulevard at Park Street and related work as shown on the plans on file with the City’s Public Works Department. The Engineer’s Estimate of cost is $480,000. Bids will be publicly opened on September 13, 2023. At the time of contract award, the contractor shall possess a Class A or C-10 Contractor’s License. No bid will be accepted from a contractor who has not been licensed in accordance with the Provisions of Chapter 9, Division III, of the Business and Professions Code of the State of California at the time the bid is submitted. Following the issuance of the Notice to Proceed and the delivery of traffic signal equipment, the contractor shall have ninety (90) working days to complete the work.

Work on the Project must be performed in strict conformity with Specification No. 21/22- 02 as adopted by the City’s City Council on August 14, 2023 which is filed with the City’s Public Works Department. Copies of these plans and specifications may be obtained by prospective bidders from the Public Works Department, 16600 Civic Center Drive, Bellflower, CA 90706 for a non-refundable fee of $35.00. Plans and specifications can be mailed for an additional non-refundable fee of $10.00 per set.

Mandatory jobsite walk will be held at 10:30 AM on Thursday, September 7, 2023 at 9944 Flora Vista Street, Bellflower, CA 90706. Prospective bidders will have opportunity to examine the project site and are encouraged to raise any questions associated with the project and site. Attendance of the jobsite walk is mandatory for parties wishing to submit a bid as the Prime Contractor.

-7-

Notice Inviting Sealed Bids
Specifications No. 16/17-04
N-2

The terms and conditions for bidding on the Project are described in the Bidding Instructions which can be found at www.bellflower.org .

This project requires payment of State prevailing rates of wages for Los Angeles County. The contractor must post copies of the prevailing schedule at each job site.

Copies of these rates of wages are available from the State of California Department of Industrial Relations Prevailing Wage Unit, Telephone No. (415) 703-4774. The website for this agency is currently located at www.dir.ca.gov .

Note that the Project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations. Pursuant to California law, the City must find bids failing to comply with all applicable Labor Code requirements including, without limitation, Labor Code §§ 1725.5 and 1771.4, to be nonresponsive.

Five percent (5%) will be deducted from each progress payment and retained by the City. The remainder less the amount of all previous payments will be paid to the Contractor. Pursuant to Public Contracts Code (“PCC”) § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC § 22300, any such election will be at the Contractor own expense and will include costs incurred by the City to accommodate the Contractor’s request.

DATED this 14th day of August, 2023.

CITY OF BELLFLOWER, CALIFORNIA

-8-

Instructions to Bidders
Specifications No. 21/22-02
I-1

CITY OF BELLFLOWER

TRAFFIC SIGNAL MODIFICATION ON BELLFLOWER BOULEVARD AT PARK STREET

SPECIFICATIONS NO. 21/22-02

BIDDING INSTRUCTIONS

1 DEFINITIONS. Unless provided otherwise, the definitions in the Greenbook, Special Conditions, or other Contract Documents are applicable to all Bidding Documents.

1.1 “Addenda” means written or graphic instruments issued by the City before the Bid Deadline that modify or interpret the Bidding Documents by additions, deletions, clarifications, or corrections.

1.2 “Alternate” means a proposed change in the Work, as described in the Bidding Documents which, if accepted, may result in a change to either the Contract Sum or the Contract Time, or both.

1.3 “Bid Deadline” means the date and time designated in the Notice for Bids as the last date and time for receipt of Bids, as may be revised by Addenda.

1.4 “Bidder” means a person or firm that submits a Bid.

1.5 “Bidding Documents” means the construction documents prepared and issued for bidding purposes including all Addenda.

1.6 “Lump Sum Base Bid” means the sum stated in the Bid for which Bidder offers to perform the Work described in the Bidding Documents, but not including unit price items or Alternates.

1.7 “Unit Price” means an amount stated in the Bid for which Bidder offers to perform the Unit Price Work for a fixed price per unit of measurement. 2 BIDDER’S REPRESENTATIONS. By making its Bid, Bidder represents that:

2.1 Bidder read, understood, and made the Bid pursuant to the requirements in the Bidding Documents.

2.2 Bidder visited the Project site and is familiar with the conditions under which the Work will be performed and the local conditions as related to the Contract Documents.

2.3 The Bid is based upon the materials, equipment, and systems required by the Bidding Documents.
-9-

Instructions to Bidders
Specifications No. 21/22-02
I-2

2.4 Bidder and all Subcontractors, regardless of tier, have the appropriate current licenses issued by the State of California Contractor’s State License Board for the Work to be performed. If Bidder is a joint venture, the Bidder will have a joint venture license appropriate for the performance of the work, and each member of the joint venture will likewise have the appropriate license. Business and Professions Code §§ 7000-7191 establish licensing requirements for contractors.

If a Bidder, that is a specialty contractor, submits a Bid involving 3 or more specialized building trades, the work of which is more than incidental and supplemental to the performance of the Work for which Bidder holds a specialty contractor license, Bidder must also hold either (1) a specialty contractor “C” license in each such trade, (2) a General Engineering contractor “A” license, or (3) a General Building contractor “B” license. This requirement is applicable whether or not Bidder lists a Subcontractor for each such trade.

2.5 If licensure or proper licensure is controverted, then proof of licensure pursuant to this section must be made by production of a verified certificate of licensure from the Contractors' State License Board which establishes that the individual or entity bringing the action was duly licensed in the proper classification of contractors at all times during the performance of any act or contract covered by the action. Nothing in this subdivision requires any person or entity controverting licensure or proper licensure to produce a verified certificate.

When licensure or proper licensure is controverted, the burden of proof to establish licensure or proper licensure is on the licensee.

2.6 Bidder has the expertise and financial capacity to perform and complete all obligations under the Bidding Documents.

2.7 The person executing the Bid Form is duly authorized and empowered to execute the Bid Form on Bidder’s behalf.

2.8 Bidder is aware of and, if awarded the Contract, will comply with Applicable Code Requirements in its performance of the Work.

2.9 The Bidder has paid the City’s business license fee(s). 3 BIDDING DOCUMENTS.

3.1 Bidders may obtain complete sets of the Bidding Documents from the City’s Public Works Department for the sum stated in the Notice for Bids.

3.2 Bidders will use a complete set of Bidding Documents in preparing Bids.

3.3 The City makes copies of the Bidding Documents available, on the above terms, for the sole purpose of obtaining Bids for the Work and does not confer a license or grant permission for any other use of the Bidding Documents. 4 INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS.

4.1 Before submitting its Bid, Bidder will carefully study and compare the various documents comprising the Bidding Documents and compare them with any other work being bid concurrently or presently under construction which relates to the -10-

Instructions to Bidders
Specifications No. 21/22-02
I-3
Work for which the Bid is submitted; will examine the Project site, the conditions under which the Work is to be performed, and the local conditions; and will at once report to the City’s Representative errors, inconsistencies, or ambiguities discovered.

4.2 Requests for clarification or interpretation of the Bidding Documents will be addressed to the City’s Representative and must be received at least seven (7) days prior to the date of receipt of bids. No request shall be taken within the six (6) days prior to bid opening.

4.3 Clarifications, interpretations, corrections, and changes to the Bidding Documents will be made by Addenda. Clarifications, interpretations, corrections, and changes to the Bidding Documents made in any other manner will not be binding and Bidders will not rely upon them.
5 PRODUCT SUBSTITUTIONS. No substitutions will be considered before award of Contract. Substitutions will only be considered after award of the Contract and as provided for in the Contract Documents.
6 SUBCONTRACTORS.

6.1 Each Bidder will list in the Bid Form all first-tier Subcontractors that will perform work, labor or render such services. The Bid Form contains spaces for the following information when listing Subcontractors: (1) Work Activity; (2) name of Subcontractor; (3) city of Subcontractor’s business location. Failure to list any of these items on the Bid Form will result in the City treating the Bid as if no Subcontractor was listed for the Work and that Bidder represents to the City that it is fully qualified to perform that portion of the Work and will perform do so.

6.2 Subcontractors listed in the Bid Form will only be substituted after the Bid Deadline with the City’s written consent in accordance with California law. 7 ADDENDA.

7.1 Addenda will be in writing and issued only by the City. Addenda will be mailed or delivered to all who are known by the City to have received a complete set of Bidding Documents and who have provided a street address for receipt of Addenda.

7.2 Copies of Addenda will be made available for inspection at the City’s Public Works Department.

7.3 The City will issue Addenda so that they are received by prospective Bidders not later than three (3) business days before the Bid Deadline. Addenda that withdraw the request for Bids or postpone the Bid Deadline may be issued any time before the Bid Deadline.

7.4 Each Bidder is responsible for ensuring that it has received all issued Addenda before issuing a Bid.
-11-

Instructions to Bidders
Specifications No. 21/22-02
I-4
8 PRE-BID CONFERENCE. Bidder will attend a Pre-Bid Conference where the City will discuss the Bidding Documents, answer questions, accept comments, and conduct a Project site visit. The City requires all Pre-Bid Conference attendees to arrive for the meeting on time and to sign an attendance list which is used to determine if Bidders meet this requirement. Any Bidder not attending the Pre-Bid Conference in its entirety will be deemed to have not complied with the requirements of the Bidding Documents and its Bid will be rejected. 9 FORM AND STYLE OF BIDS

9.1 Bids will be submitted on the Bid Form included with the Bidding Documents.

Bids not submitted on the City’s Bid Form will be rejected.

9.2 All blanks on the Bid Form will be filled in legibly in ink or by typewriter.

9.3 Bidder’s failure to submit a price for any Alternate or unit price will result in the Bid being considered as nonresponsive. If Alternates are called for and no change in the Lump Sum Base Bid is required, enter “No Change.”

9.4 Each Bidder must fill out the “Bidders Statement of Past Contract Disqualifications” form stating any and all instances of contract disqualifications due to a violation of a law or safety regulation. The Bidder must explain the circumstances of each disqualification. The City may reject the bid based on such information.

9.5 Bidder will make no stipulations on the Bid Form nor qualify the Bid in any manner.

9.6 The Bids will be based upon full completion of all the Work as shown on the plans and specifications. It is expressly understood that the plans are drawn with as much accuracy as is possible in advance, but should errors, omissions or discrepancies exist in the plans which show conditions that vary from those encountered in construction, the Bidder (if awarded the Contract) specifically agrees to construct a completed work ready for the use and in the manner which is intended. In the event of increasing or decreasing of work, the total amount of work actually done or materials or equipment furnished must be paid for according to the unit or lump sum price established for such work under the contract, wherever such unit or lump sum price has been established. In the event no prices are named in the contract to cover such changes or alterations, the cost of such changes must be covered as extra work.

9.7 The Bid Form will be signed by a person or persons legally authorized to bind Bidder to a contract. Bidder’s Representative will sign and date the Declaration included in the Bid Form. Failure to sign and date the declaration will cause the Bid to be rejected.
10 BID SECURITY

10.1 Each Bid will be accompanied by Bid Security, in the amount of 10% of the Lump Sum Base Bid as security for Bidder’s obligation to enter into a Contract with the City on the terms stated in the Bid Form and to furnish all items required -12-

Instructions to Bidders
Specifications No. 21/22-02
I-5
by the Bidding Documents. Bid Security will be a Bid Bond on the form provided by the City or a certified check made payable to “City of Bellflower.” When a Bond is used for Bid Security, failure to use the City’s Bid Bond form will result in the rejection of the Bid.

10.2 If the apparent lowest responsible Bidder fails to sign the Agreement and furnish all items required by the Bidding Documents within the time limits specified in these Instructions to Bidders, the City will disqualify such Bidder and select the next apparent lowest responsible Bidder until all bids have been exhausted or the City may reject all bids. In such an event, the disqualified Bidder will be liable for and forfeit to the City the amount of the difference, not to exceed the amount of the Bid Security, between the amount of the disqualified Bid and the larger amount for which the City procures the Work.

10.3 If a Bid Bond is submitted and an attorney-in-fact executes the Bid Bond on behalf of the surety, a notarized and current copy of the power of attorney will be affixed to the Bid Bond. The surety issuing the Bid Bond will be listed in the latest published State of California, Department of Insurance list of, “Insurers Admitted to Transact Surety Insurance in This State.”

10.4 The City will retain Bid Security until the occurrence of one of the following:

10.4.1 All items required by the Bidding Documents have been furnished and the Agreement has been signed by the successful Bidder and the City.

10.4.2 The specified time has elapsed during which Bids may be withdrawn.

10.4.3 All Bids have been rejected.

10.5 The Bid Form, Bid Security, and all other documents required to be submitted with the Bid will be enclosed in a sealed opaque envelope. The envelope will be addressed to the City Clerk. The envelope will be identified with the TRAFFIC SIGNAL MODIFICATION ON BELLFLOWER BOULEVARD AT PARK STREET, Bidder’s name and address, and, if applicable, the designated portion of the Project for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope will be enclosed in a separate mailing envelope labeled as follows: “SEALED BID ENCLOSED.”

10.6 Bids will be deposited at the designated location on or before the Bid Deadline. A Bid received after the Bid Deadline will be returned to Bidder unopened.

10.7 Bidder will assume full responsibility for timely delivery at the location designated for receipt of Bids.

10.8 Oral, telephonic, facsimile, or telegraphic Bids are invalid and will not be accepted.
11 MODIFICATION OR WITHDRAWAL OF BID.
-13-

Instructions to Bidders
Specifications No. 21/22-02
I-6

11.1 Before the Bid Deadline, a submitted Bid may be modified or withdrawn.

Notice of such action will be given to the City in writing and signed by the Bidder’s authorized representative. A change so made will be so worded as not to reveal the amount of the original Bid.

11.2 A withdrawn Bid may be resubmitted up to the Bid Deadline, provided that it then fully complies with the Bidding Requirements.

11.3 Bid Security will be in an amount sufficient for the Bid as modified or resubmitted.

11.4 Bids may not be modified, withdrawn, or canceled within sixty (60) days after the Bid Deadline unless otherwise provided in Supplementary Instructions to Bidders.
12 OPENING OF BIDS. Bids submitted in the manner required by these instructions and are received on or before the Bid Deadline will be opened publicly. 13 REJECTION OF BIDS.

13.1 The City will have the right to reject all Bids.

13.2 The City will have the right to reject any Bid not accompanied by the required Bid Security or any other item required by the Bidding Documents, or a Bid which is in any other way materially incomplete or irregular. 14 AWARD

14.1 The City may retain all bids for a period of sixty (60) days for examination and comparison, and to delete any portion of the work from the contract.

14.2 The City will have the right to waive nonmaterial irregularities in a Bid and to accept the lowest responsive Bid as determined by The City.

14.3 The City will have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents.

14.4 The City will determine the low Bidder on the basis of the sum of the Lump Sum Base Bid plus all unit prices multiplied by their respective estimated quantities as stated in the Bid Form, if any, plus the Contractor Delay Damages multiplied by the “multiplier” as stated in the Bid Form, plus the amounts of all accepted Alternates.

14.4.1 Inclusion of Contractor Delay Damages within the Bid Form is solely for the purpose of determining the low bidder and establishing the City’s maximum daily liability as a result of City delays to Contractor, if any, and City has no obligation to pay any daily Contractor Delay Damages except as provided for in these Contract Documents for Compensable Delays. In the event that City becomes liable to Contractor for compensable delays, City agrees to pay Contractor the daily Contractor Delay Damages set forth in the Proposal Form or Contractor’s -14-

Instructions to Bidders
Specifications No. 21/22-02
I-7
actual daily delay damages, whichever is less, for each day of Compensable Delay as provided for by these Contract Documents.

14.5 The City will select the apparent lowest responsive and responsible Bidder and notify such Bidder within thirty (30) days (unless number of days is modified in Supplementary Instructions to Bidders) after the Bid Deadline or reject all bids.

Within ten (10) days after receiving the City’s notice that Bidder was selected as the apparent lowest responsible Bidder, Bidder will submit to the City all of the following items:

14.5.1 Two originals of the Agreement signed by Bidder.

14.5.2 Two originals of the Labor and Materials Bond.

14.5.3 Two originals of the Faithful Performance Bond.

14.5.4 Certificates of Insurance.

14.5.5 Names of all Subcontractors, with their addresses, telephone number, facsimile number, trade on Bidders’ company stationery.

Evidence, as required by the City, of the reliability and responsibility of the proposed Subcontractors such as statements of experience, statements of financial condition, and references.

14.5.6 Preliminary Contract Schedule.

14.5.7 Selection of Retention Options and Escrow Agreement for Deposit of Securities in Lieu of Retention and Deposit of Retention. If not submitted, the City will withhold retention.

14.5.8 Cost Breakdown.

14.6 Before award of the Contract, the City will notify Bidder in writing, if the City objects to a Subcontractor proposed by Bidder, in which case Bidder will propose a substitute acceptable to the City. Failure of the City to object to a proposed Subcontractor before award will not preclude the City from requiring replacement of any Subcontractor based upon information received subsequent to award, information which cannot be properly evaluated before award due to time constraints, or information relating to a failure to comply with the requirements of the Contract.

14.7 If Bidder submits the two original signed Agreements and all other items within ten (10) days after receiving the City’s notification, and all such items comply with the requirements of the Bidding Documents, the City will award the Contract to Bidder by signing the Agreement and returning a signed copy of the Agreement to Bidder.

14.8 If the City consents to the withdrawal of the Bid of the apparent lowest responsible Bidder, or the apparent lowest responsible Bidder fails or refuses to sign the Agreement or submit to the City all of the items required by the Bidding Documents, within ten (10) days after receiving the City’s notification, or the City -15-

Instructions to Bidders
Specifications No. 21/22-02
I-8
determines that the Bidder is not financially or otherwise qualified to perform the Contract, the City may reject such Bidder’s Bid and select the next apparent lowest responsible Bidder, until all bids are exhausted, or reject all Bids. 15 PROTEST

15.1 Procedure to be followed by protester and City Clerk.

A. Persons may challenge (the “Protester”) an award of a City of Bellflower Public Works contract (the “Project”) based upon whether the apparent lowest responsible bidder (the “Low Bidder”) is a “responsible bidder” as defined by applicable law.

B. The Protester must file a written statement with the City Clerk (the “Protest”) that sets forth the reasons for objection. The Protest must be filed with the City Clerk not later than seven (7) days after the bids were received and opened, or as soon as the Protester becomes aware of the ground for the Protest, whichever date occurs first. Any documents which support the objections must be filed together with the Protest.

C. Upon receiving the Protest, the City Clerk must mail a copy of the Protest to the Low Bidder, together with any supporting documents filed with the Protest. The City Clerk must include a letter of transmittal with the Protest which contains substantially the following information:

1. Notice that the Protest (and supporting documents, if any) was filed with the City Clerk;

2. Notice regarding the date, time, and place when and where the City Council will consider the bids received in connection with the Project; and

3. Notice that the Low Bidder may appear at the meeting and rebut the Protest including, without limitation, the ability to present evidence that the Low Bidder is qualified to perform the work and is the “lowest responsible bidder” on the Project.

D. In addition to the notice provided to the Low Bidder, the City Clerk must attempt to contact the Low Bidder by phone regarding the Protest. If the City Clerk is able to contact the Low Bidder, the City Clerk must provide, if the Low Bidder requests it, a facsimile copy of the Protest.

E. The City Clerk must also provide the Protester with notice regarding the date, time, and place when and where the City Council will meet to consider bids for the Project.

15.2 Procedure to be followed at the Hearing.

A. At the time set for consideration of the bids received in connection with the Project, the City Council must allow City staff to proceed with its presentation first. -16-

Instructions to Bidders
Specifications No. 21/22-02
I-9

B. Following the staff presentation, the City Council will allow the Protester to make his/her presentation. The Protester has the right to introduce any testimony or other evidence which could not, by the exercise of reasonable diligence, have been submitted at the time the Protest was filed.

C. Following the Protester’s presentation, the Low Bidder has the right to cross-examine any witnesses who testified on behalf of the Protester and to rebut any other evidence introduced or produced by the Protester or City staff.

D. The City Council may, in its discretion, permit rebuttals and surrebuttals by the Protester and/or the Low Bidder.

E. At the conclusion of the hearing on the Protest, the City Council must decide whether, based on the evidence produced at the hearing, the Low Bidder is or is not the lowest responsible bidder.

F. In deciding where the Low Bidder is “responsible,” the City Council must consider the Low Bidder’s trustworthiness, and the quality, fitness and capacity of the Low Bidder to satisfactorily perform the work required to be performed for the Project. Evidence of pervasive and significant violations of the prevailing wage laws of the State of California by the Low Bidder on a City Public Works project or on public works projects involving other public agencies warrants a finding by the City Council that the Low Bidder is not the lowest responsible bidder.

G. If the Low Bidder is found to be “responsible” under the criteria referred to above, the City Council must award the contract for the Project to the Low Bidder, unless the City Council rejects all bids for the Project.

H. If the Low Bidder is found not be “responsible” under the criteria referred to above, the City Council must make a finding to that effect and must then award the contract to the second lowest responsible bidder, unless the City Council rejects all bids for the Project.

-17-

BID
Specifications No. 21/22-02
B-1
BID

BID TO: CITY OF BELLFLOWER, CALIFORNIA

The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the City in the form included in the Contract Documents to perform the Work as specified or indicated in said Contract Documents entitled:

FOR CONSTRUCTION OF

TRAFFIC SIGNAL MODIFICATION ON BELLFLOWER BOULEVARD AT PARK STREET

IN THE CITY OF BELLFLOWER
SPECIFICATION NO. 21/22-02

Bidder accepts all of the terms and conditions of the Contract Documents, including without limitation those in the Notice Inviting Bids and the Instructions to Bidders dealing with the disposition of the Bid Security.

This Bid will remain open for the period stated in the Notice Inviting Bids, unless otherwise required by law. Bidder will enter into an Agreement within the time and in the manner required in the Instructions to Bidders, and will furnish the insurance certificates, Payment Bond, Performance Bond, and all Permits required by the Contract Documents.

Bidder has examined copies of all the Contract Documents, including the following Addenda (receipt of which is hereby acknowledged):

Number ______________ Date ____________________

Number ______________ Date ____________________

Number ______________ Date ____________________

Number ______________ Date ____________________

Bidder has familiarized itself with the nature and extent of the Contract Documents, the Work, the site, the locality where the Work is to be performed, the legal requirements (federal, state, and local laws, ordinances, rules, and regulations), and the conditions affecting cost, progress, or performance of the Work, and has made such independent investigations as Bidder deems necessary.

In conformance with the current statutory requirements of Labor Code § 1860, et seq., the undersigned confirms the following as its certification:

I am aware of Labor Code § 3700, which require every employer to be insured against liability for worker's compensation, or to undertake self-insurance in accordance with the provisions, before commencing the performance of the Work of this Contract.

To all the foregoing, and including all Bid Schedule(s), List of Subcontractors, Non-collusion Affidavit, Bidder's General Information, and Bid Bond contained in these Bid Forms, said Bidder further agrees to complete the Work required under the Contract Documents within the Contract Time stipulated in said Contract Documents, and to accept in full payment therefor the Contract Price based on the Lump Sum or Unit Bid Price(s) named in the aforementioned Bidding Schedule(s).

Dated: ______________________________ Bidder:

By:
(Signature)

Title:
-18-

BID
Specifications No. 21/22-02
B-2

BIDDER'S GENERAL INFORMATION

The Bidder shall furnish the following information. Failure to complete all Items will cause the Bid to be non-responsive and may cause its rejection. Additional sheets may be attached as required.

1. BIDDER/CONTRACTOR'S Name and Street Address:

2. CONTRACTOR'S Telephone Number: ( )
Facsimile Number: ( )
Email address:

3. CONTRACTOR'S License: Primary Classification
State License Number(s)
Supplemental License Classifications
Department of Industrial Relations (DIR) Registration No. _______________________________

4. Surety Company and Agent who will provide the required Bonds on this Contract:

Name of Surety
Address

Surety Company Agent
Telephone Numbers: Agent ( ) Surety ( )

5. Type of Firm (Individual, Partnership or Corporation):

6. Corporation organized under the laws of the State of:

7. List the names and addresses of the principal members of the firm or names and titles of the principal officers of the corporation or firm:

-19-

BID
Specifications No. 21/22-02
B-3
BIDDER'S GENERAL INFORMATION (Continued)

8. Number of years experience as a contractor in this specific type of construction work:

9. List at least three related projects of comparable size and complexity completed to date:

1. Owner
Contact
Phone ( )
Project ( )
Address
Class of Work
Contract amount
Date completed

2. Owner
Contact
Phone ( )
Project ( )
Address
Class of Work
Contract amount
Date completed

3. Owner
Contact
Phone ( )
Project ( )
Address
Class of Work
Contract amount
Date completed

10. List the name and title of the person who will supervise full-time the proposed work for your firm:

11. Is full-time supervisor an employee contract services ?

12. A financial statement or other information and references sufficiently comprehensive to permit an appraisal of your current financial condition may be required by the Engineer.

13. Name of the person who inspected the site of the proposed Work for the bidder:

Name: Date of Inspection:

-20-

BID
Specifications No. 21/22-02
B-4

TRAFFIC SIGNAL MODIFICATION ON BELLFLOWER BOULEVARD AT PARK STREET

BIDDER’S STATEMENT OF PAST CONTRACT DISQUALIFICATIONS

Please state all instances of being disqualified, removed, or otherwise prevented from bidding on, or completing, a federal, state, or local government project due to a violation of a law or safety regulation.

1. Have you ever been disqualified from any government contract?

Yes  No 

2. If yes, explain the circumstances:

_________________________________
Bidder’s Signature

-21-

BID
Specifications No. 21/22-02
B-5

INSURANCE REQUIREMENTS
[MUST BE SUBMITTED WITH PROJECT PROPOSAL]

To be awarded this contract, the successful bidder must procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below:

Type of Insurance Limits

Commercial general liability: $3,000,000
Business automobile liability $1,000,000
Workers compensation Statutory requirement.

Commercial general liability insurance must meet or exceed the requirements of ISO- CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above must be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies must be endorsed to name the City, its officials, and employees as “additional insureds” under said insurance coverage and to state that such insurance will be deemed “primary” such that any other insurance that may be carried by the City will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 11 85 or 88, or equivalent. Such insurance must be on an “occurrence,” not a “claims made,” basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to the City.

Automobile coverage must be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto).

The Consultant must furnish to the City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by the City from time to time. Insurance must be placed with admitted insurers with a current A.M. Best Company Rating equivalent to at least a Rating of “A:VII.” Certificate(s) must reflect that the insurer will provide thirty (30) day notice of any cancellation of coverage. The Consultant will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions.

By signing this form, the bidder certifies that it has read, understands, and will comply with these insurance requirements if it is selected as the City’s consultant. Failure to provide this insurance will render the bidder’s proposal “nonresponsive.”

___________________ __________________________
Date Bidder
-22-

BID
Specifications No. 21/22-02
B-6
Contractor's Name
_________________________________________________________ List of Subcontractors and Off-Job Fabricators
Listing must comply with the provisions of Public Contract Code § 4104.

Name of Subcontractor
or Off-Job Fabricator
Contractor’s License No.

DIR Registration No.

Business Address
Telephone No.

Email address
Items of Work and Dollar
Amount

If more space is needed, attach additional sheets.

Public Contract Code § 4104 provides that bidders must list:
(a)(1) The name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of 1 percent of the prime contractor's total bid or ten thousand dollars ($10,000), whichever is greater.

Per Public Contract Code §4104, Contractor’s bidding on public projects are required to list above California contractor license numbers for all subcontractor’s performing work in excess of one- half of one-percent of the contract’s value.

-23-

BID
Specifications No. 21/22-02
B-7

UNIT PRICE BID SCHEDULE A
Schedule of Prices for the Construction of the:

TRAFFIC SIGNAL MODIFICATION ON BELLFLOWER BOULEVARD AT PARK STREET
SPECIFICATIONS NO. 21/22-02
in Bellflower, California

Item
No. Description Estimated
Quantity Unit Price Total Amount

1. Mobilization/De-mobilization
(may not exceed 5% of total
construction costs)
1 LS

2. Construct modified traffic
signal and all ancillary
improvements complete. Note
includes acquisition and
providing all equipment
1 LS

3. Maintain existing traffic signal
operation via temporary
overhead wiring complete.
1 LS

4. Install temporary 1-A pole on
concrete blocks. 1 LS

5. Install temporary traffic signal
pole on concrete blocks with
safety lights.
1 LS

6. Cut, cap and remove
abandoned conduit complete. 1 LS

7. Survey Monumentation 1 LS

8. Construction BMP’s 1 LS

9. Prepare and implement traffic
control plan complete. Note,
plan to be prepared by a CA.
licensed civil or traffic engineer
1 LS

Name of Bidder or Firm
TOTAL BID PRICE – FOR SCHEDULE A
For the lump sum of

$
(Price in figures)

(Price in words)

QUANTITIES OF WORK:

The quantities of work or material stated in the unit price items of the Bid Schedule are supplied only to give an indication of the general scope of the Work. The City of Bellflower does not expressly or by implication agree that the actual amounts of work or material will correspond therewith, and reserves the right after award to increase or -24-

BID
Specifications No. 21/22-02
B-8
decrease the quantity of any unit price bid item, by an amount up to 25 percent of increase or decrease, without a change in the unit prices, and may delete any bid item in its entirety, and receive full credit in the amount shown in the Bid Schedule for the deleted item of Work.

Name of Bidder or Firm

BID BOND

KNOW ALL MEN BY THESE PRESENTS: That we ___________________________

__________________________________________________________________, Principal,

and________________________________________________________________________

__________________________________________________________, Surety, are held and firmly bound unto
THE CITY OF BELLFLOWER Obligee,
in the sum of Ten Percent of the total amount of the Bid for the payment of which we bind ourselves, our legal representatives, successors and assigns, jointly and severally, firmly by these presents.

Principal submitted or is about to submit a bid or proposal to Obligee on a contract for

TRAFFIC SIGNAL MODIFICATION ON BELLFLOWER BOULEVARD AT PARK STREET

Should a contract be awarded to the principal and principal, within such time as specified, duly execute the contract in the prescribed form and deliver the same to obligee with all required bonds/performance securities, certificates of insurance and such other items as required in the bidding or contract documents then this obligation is null and void. Otherwise, it will remain in full force and effect, and if the contract is awarded to principal and principal fails, within the time specified, to duly execute the contract in the prescribed form and deliver the same to obligee with all said required items, then surety must pay obligee the full penalty sum of this bond.

Surety, for value received, hereby agrees that no extension of time, change, alteration, modification, or addition to the bidding or contract documents, or of the work required thereunder, releases or exonerates surety on this bond or in any way affect the obligation of this bond; and surety does hereby waive notice of same.

Signed, sealed and dated
_______________________________________________
(Principal)

by________________________________________(Seal)

_______________________________________________
(Surety)

by_____________________________________________
Attorney-in-Fact

INDICATE COMPLETE ADDRESS OF SURETY TO WHICH

CORRESPONDENCE CONCERNING THIS BOND SHOULD BE
DIRECTED.

Telephone No.

-25-

BID
Specifications No. 21/22-02
B-9

NON COLLUSION DECLARATION TO BE EXECUTED
BY

BIDDER AND SUBMITTED WITH BID

The undersigned declares:

I am the __________________ of ________________________________, the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ____________ [date], at ______________________ [city], ________________________ [state].

___________________________
Signature

-26-

Agreement
Specifications No. 21/22-02
C-1

PUBLIC WORKS CONTRACT

BETWEEN

THE CITY OF BELLFLOWER AND

This CONTRACT is entered into this day of , 20 , by and between the CITY OF BELLFLOWER, a general law city and municipal corporation (“the City”) and (“the Contractor”).

1. WORK.

A. The Contractor will provide all work required by the Contract Documents (the “Work”). The Contractor agrees to do additional work arising from changes ordered by the City in accordance with the Contract Documents.

B. The Contractor and the City agree to abide by the terms and conditions contained in the Contract Documents;

C. The Contractor will furnish all of the labor; supplies and materials; equipment; printing; vehicles; transportation; office space and facilities; all tests, testing and analyses; and all matters whatsoever (except as otherwise expressly specified to be furnished by the City) needed to perform and complete the Work and provide the services required of the Contractor by the Contract Documents.

D. “Contract Documents” means the Notice Inviting Bids; Instructions to Bidders; Supplementary Instructions to Bidders; Proposal; this Contract; Standard Specifications; Supplementary Conditions; Exhibits; Technical Specifications; List of Drawings; Drawings; Addenda; Notice to Proceed; Change Orders; Notice of Completion; and all other documents identified in the Contract Documents which together form the contract between the City and the Contractor for the Work. The Contract Documents constitute the complete agreement between the City and the Contractor and supersede any previous agreements or understandings.

2. CONTRACT SUM. The City agrees to pay the Contractor a sum not to exceed dollars ($ ) for the Work in the manner set forth in the Contract Documents. The City may adjust this amount as set forth in the Contract Documents.

3. TIME FOR PERFORMANCE.

A. The Contractor will fully complete the Work within (XX) working days (the “Contract Time.”)

B. The Contract Time will commence when the City issues a notice to proceed.

The Contract Documents will supersede any conflicting provisions included on the notice to proceed issued pursuant to this Contract. -27-

Agreement
Specifications No. 21/22-02
C-2

C. The Contractor may not perform any Work until:

i. The Contractor furnishes proof of insurance as required by the Contract Documents; and

ii. The City gives the Contractor a written, signed, and numbered purchase order and notice to proceed.

D. By signing this Contract, the Contractor represents to the City that the Contract Time is reasonable for completion of the Work and that the Contractor will complete the Work within the Contract Time.

E. Should the Contractor begin the Work before receiving written authorization to proceed, any such Work is at the Contractor’s own cost and risk.

4. DISPUTES. Disputes arising from this contract will be determined in accordance with the Contract Documents and Public Contracts Code §§ 10240-10240.13.

5. THIRD PARTY CLAIMS. In accordance with Public Contracts Code § 9201, the City will promptly inform the Contractor regarding third-party claims against the Contractor, but in no event later than ten (10) business days after the City receives such claims. Such notification will be in writing and forwarded in accordance with the “Notice” section of the Contract Documents. As more specifically detailed in the Contract Documents, the Contractor agrees to indemnify and defend the City against any third-party claim.

6. TAXPAYER IDENTIFICATION NUMBER. The Contractor will provide the City with a Taxpayer Identification Number.

7. PERMITS AND LICENSES. Unless otherwise provided, the Contractor, at its sole expense, will obtain and maintain during the Contract Time, all necessary permits, licenses, and certificates that may be required in connection with the Work.

8. OWNERSHIP OF DOCUMENTS. All documents, data, studies, drawings, maps, models, photographs and reports prepared by the Contractor under the Contract Documents are the City’s property. The Contractor may retain copies of said documents and materials as desired, but will deliver all original materials to the City upon the City’s written notice.

9. INDEMNIFICATION. The Contractor agrees to indemnify, defend, and hold the City harmless as set forth in the Contract Documents. The requirements as to the types and limits of insurance coverage to be maintained by the Contractor as required by the Contract Documents, and any approval of such insurance by the City, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Contractor pursuant to the Contract Documents, including, without limitation, to the provisions concerning indemnification.

10. INDEPENDENT CONTRACTOR. The City and the Contractor agree that the Contractor will act as an independent contractor and will have control of all work and -28-

Agreement
Specifications No. 21/22-02
C-3
the manner in which is it performed. The Contractor will be free to contract for similar service to be performed for other employers while under contract with the City. The Contractor is not an agent or employee of the City and is not entitled to participate in any pension plan, insurance, bonus or similar benefits the City provides for its employees. Any provision in this Contract that may appear to give the City the right to direct the Contractor as to the details of doing the work or to exercise a measure of control over the work means that the Contractor will follow the direction of the City as to end results of the work only.

11. AUDIT OF RECORDS. The Contractor will maintain full and accurate records with respect to all services and matters covered under this Contract. The City will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. The Contractor will retain such financial and program service records for at least three (3) years after termination or final payment under the Contract Documents.

12. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows:

The City The Contractor
Len Gorecki, Director of Public Works
16600 Civic Center Drive
Bellflower, CA
[email protected]

Any such written communications by mail will be conclusively deemed to have been received by the addressee three (3) days after deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph.

13. NO THIRD PARTY BENEFICIARY. This Contract and every provision herein is for the exclusive benefit of the Contractor and the City and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of the Contractor’s or the City’s obligations under this Contract.

14. INTERPRETATION. This Contract was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this Contract will be in Los Angeles County.

15. EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity between any provision of the Contract Documents, precedence will be as follows:

A. This Contract;

B. The Standard Specifications; and
-29-

Agreement
Specifications No. 21/22-02
C-4
C. Precedence of documents as determined in the Standard Specifications.

16. SEVERABILITY. If any portion of the Contract Documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Contract will continue in full force and effect.

17. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Contract and to engage in the actions described herein. This Contract may be modified by written amendment. The City’s city manager, or designee, may execute any such amendment on the City’s behalf.

18. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Contract, agreements ancillary to this Contract, and related documents to be entered into in connection with this Contract will be considered signed when the signature of a party is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature.

19. COVENANTS AND CONDITIONS. The parties agree that all of the provisions hereof will be construed as both covenants and conditions, the same as if the words importing such covenants and conditions had been used in each separate paragraph.

20. CAPTIONS. The captions of the paragraphs of this Contract are for convenience of reference only and will not affect the interpretation of this Contract.

21. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the Contract Documents.

[SIGNATURES ON NEXT PAGE]

-30-

Agreement
Specifications No. 21/22-02
C-5

IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written.

CITY OF BELLFLOWER _______

_________________________________ ____________________________ Jeffrey L. Stewart,
City Manager

_____________________________

ATTEST:

_____________________________ Taxpayer ID No. _______________ Mayra Ochiqui,
City Clerk

APPROVED AS TO FORM:

_________________________________
Karl H. Berger,
City Attorney

-31-

Faithful Performance Bond
Specifications No. 21/22-02
FPB-1

CITY OF BELLFLOWER

TRAFFIC SIGNAL MODIFICATION ON BELLFLOWER BOULEVARD AT PARK STREET

SPECIFICATIONS NO. 21/22-02

FAITHFUL PERFORMANCE BOND

Bond No.

Bond Fee:

(“PRINCIPAL”)
and , a corporation incorporated under the laws of the State of and licensed by the State of California to execute bonds and undertakings as sole surety, as surety (“SURETY”), are held and firmly bound unto the CITY OF BELLFLOWER (“CITY”) in the sum of ($ ) dollars, lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument.

PRINCIPAL or SURETY will apply this bond for the faithful performance of any and all of the conditions and stipulations set forth in this bond, SPECIFICATIONS NO. 21/22-02, and the public works contract executed with such Specifications. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default.

BOND CONDITIONS

1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. 21/22-02, a copy of which is on file with CITY’s Public Works Department (“Public Project”). Such performance will be in accordance with CITY’s plans and profiles which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY’s Public Works Department. CITY has estimated the required amount of the bond as shown above.

2. PRINCIPAL’s work on the Public Project will be done in accordance with CITY’s plans and specifications and with any permit issued by CITY. Should PRINCIPAL fail to complete all required work within the time allowed, CITY may, at its sole discretion, cause all required work to be done and the parties executing the bond will be firmly bound for the payment of all necessary costs therefor.

3. PRINCIPAL will guarantee its work against any defective work, labor, or materials on the Public Project for a period of one (1) year following the Public Project’s completion and acceptance by CITY.

4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the Bellflower Municipal Code (“BMC”).

-32-

Faithful Performance Bond
Specifications No. 21/22-02
FPB-2

5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. 21/22-02 or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed.

6. This bond consists of this instrument; the plans and specifications identified above; and the following two (2) attached exhibits all of which are incorporated herein by reference:

A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so;

B. A certificate issued by the county clerk for the county in which SURETY’s representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY’s certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted; and

7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL’s obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect.

SIGNED AND SEALED this day of , 20__.

PRINCIPAL’s PRESIDENT SURETY’s PRESIDENT

PRINCIPAL’s SECRETARY SURETY’s SECRETARY

PRINCIPAL’s MAILING ADDRESS: SURETY’s MAILING ADDRESS:

NOTE: ALL signatures must be acknowledged by a notary public. -33-

Labor and Materials Bond
Specifications No. 21/22-02
L&MB-1

CITY OF BELLFLOWER

TRAFFIC SIGNAL MODIFICATION ON BELLFLOWER BOULEVARD AT PARK STREET

SPECIFICATIONS NO. 21/22-02

LABOR AND MATERIALS BOND

Bond No.

Bond Fee:

, as principal (“PRINCIPAL”)
and , a corporation incorporated under the laws of the State of and licensed by the State of California to execute bonds and undertakings as sole surety, as surety (“SURETY”), are held and firmly bound unto the CITY OF BELLFLOWER (“CITY”) in the sum of ($ ) dollars, lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument.

This bond is conditioned upon and guarantees payment by PRINCIPAL to contractors, subcontractors, and persons renting equipment; payment by PRINCIPAL and all PRINCIPAL’S subcontractors for all materials, provisions, provender, or other supplies, and equipment used in, upon, for or about the performance of the work contemplated in SPECIFICATIONS NO. 21/22-02 (“Public Project”), the public works contract executed for such Public Project, and for all work or labor of any kind performed for the Public Project. In the case of any default in the performance of the conditions and stipulations of this undertaking, it is agreed that PRINCIPAL or SURETY will apply the bond or any portion thereof, to the satisfaction of any damages, reclamation, assessments, penalties, or deficiencies arising by reason of such default.

BOND CONDITIONS

1. PRINCIPAL will construct the public improvements identified in SPECIFICATIONS NO. 21/22-02, and the public works contract executed for such Specifications, copies of which is on file with CITY’s Public Works Department (“Public Project”). Such performance will be in accordance with CITY’s plans and profiles which are made a part of this bond when said plans and profiles are approved by the City Council and filed with CITY’s Public Works Department.

2. PRINCIPAL will pay all contractors, subcontractors, and persons renting equipment.

3. PRINCIPAL will pay for all materials and other supplies, for equipment used in, on, for or about the performance of the Public Project, and will pay for all work and labor thereon.

4. This bond is conditioned upon and guarantees due compliance with all -34-

Labor and Materials Bond
Specifications No. 21/22-02
L&MB-2
applicable law including, without limitation, the Bellflower Municipal Code (“BMC”).

5. SURETY, for value received, agrees that no changes, extensions of time, alteration or modification of SPECIFICATIONS NO. 21/22-02, or of the obligation to be performed will in any way affect its obligation on this bond, and it waives notice of any such change, extension of time, alteration or modification of the contract documents or of the obligation to be performed.

6. This bond consists of this instrument; the plans and specifications identified above; and the following TWO (2) attached exhibits all of which are incorporated herein by reference:

A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and

B. A certificate issued by the county clerk for the county in which SURETY’s representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY’s certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted.

7. Should PRINCIPAL perform its obligations within the time allowed, PRINCIPAL’s obligation will be void upon the acceptance of the performance by CITY; otherwise this obligation will remain in full force and effect.

SIGNED AND SEALED this day of , 20__.

PRINCIPAL’s PRESIDENT SURETY’s PRESIDENT

PRINCIPAL’s SECRETARY SURETY’s SECRETARY

PRINCIPAL’s MAILING ADDRESS: SURETY’s MAILING ADDRESS:

NOTE: ALL signatures must be acknowledged by a notary public.

-35-

Worker’s Compensation
Specifications No. 21/22-02
WC-1

WORKERS’ COMPENSATION CERTIFICATE

(AS REQUIRED BY LABOR CODE § 1861)

I am aware of Labor Code § 3700 which requires every employer to be insured against liability for workers’ compensation, or to undertake self-insurance in accordance with the provisions of said Code, and I will comply with such provisions before commencing the performance of the Work of this Contract.

Contractor

By

Title

-36-

Declaration of Sufficiency of Funds
Specifications No. 21/22-02
DSF-1

DECLARATION OF SUFFICIENCY OF FUNDS
(California Labor Code Section 2810)

I, the undersigned, an authorized representative of ________________ (insert name of Bidder) (“Bidder”) with authority to make the statements contained in this Declaration on behalf of Bidder, hereby declare the following:

1. The Bidder’s employer identification number for state tax purposes is ______________________ (insert identification number).

2. The Bidder’s workers’ compensation insurance policy number is ______________________ (insert policy number) and the name, address, and telephone number of the insurance carrier providing said insurance is:
__________________________________ (insert information requested).

3. The following information is provided concerning any and all vehicles that are owned by the Bidder and that will be used for transportation in connection with any service provided for the performance of the Work that is subject of the Bidder’s Bid to the District (insert information requested.

Attach addition sheets, if needed):

Vehicle Vehicle ID No.

Vehicle
Liability Insurance Policy No.
(of Policy covering vehicle)
Name, Address and Telephone No.
of Vehicle Liability Insurance Carrier
(issuing Policy covering vehicle)

-37-

Declaration of Sufficiency of Funds
Specifications No. 21/22-02
DSF-2

4. The following is the address of any real property that will be used to house workers in connection with the performance of the W ork that is subject of the Bidder’s Bid to the District (insert information requested. If no such housing will be provided, enter “none”). ___________________________.

5. The actual or estimated number of workers that will be employed to perform the Work of the Project that is the subject of the Bidder’s Bid, the total amount of wages to be paid to said workers, and the date on which said wages will be paid are as follows (attach additional sheets, if needed):

Total Number of Workers Total Amount of Wages Dates for Payment of Wages

6. Check only one of the following boxes, as applicable:

The statement of number of workers declared in Paragraph 5, above, is a statement of the actual number of workers that will be employed; or

The actual number of workers requested in Paragraph 5, above, is unknown and therefore the statement of number of workers declared therein is based on the Bidder’s best estimate available at the time of Bid, rather than the actual number of workers that will be employed.

7. The actual or estimated total number of persons and entities who will be utilized as independent contractors to perform the Work of the Project that is the subject of the Bidder’s Bid (together with their known, current local, state, and federal contractor license identification numbers that each is required to have under local, state or federal laws or regulations are as follows (attach additional sheets, if needed):

List of Independent Contractors Current, Local, State and Federal Contractor License Identification Number

-38-

Declaration of Sufficiency of Funds
Specifications No. 21/22-02
DSF-3

8. Check only one of the following boxes, as applicable:

The statement of number of independent contractors declared in Paragraph 7, above, is a statement of the actual number of independent contractors that will be utilized; or,

The actual number of independent contractors requested in Paragraph 7, above, is unknown and therefore the statement of number of independent contractors declared therein is based on the Bidder’s best estimate available at the time of Bid, rather than the actual number of independent contractors that will be utilized.

I, the undersigned, declare under penalty of perjury that the foregoing statements are within my personal knowledge and are true and correct. Executed on this ______ day of ______________, in the year 20___.

_____________________________________

_____________________________________
Print Name

-39-

Guaranty
Specifications No. 21/22-02
G-1

CITY OF BELLFLOWER

TRAFFIC SIGNAL MODIFICATION ON BELLFLOWER BOULEVARD AT PARK STREET

SPECIFICATIONS NO. 21/22-02

GUARANTY

In accordance with the terms of the contract for the Traffic Signal Modification on Bellflower Boulevard at Park Street in the City of Bellflower (the “Contract”) approved ______________________________ between the City of Bellflower (the “Agency”) and the undersigned (the “Contractor”), under which the Contractor shall complete work as described in the Contract Documents (as defined in the Contract), the following guarantee of said work is hereby made.

If any of the items installed pursuant to the Contract, prove defective or if the item, as a whole, proves defective, due to faulty workmanship, material furnished or methods of installation, or if the said item or any part thereof fails to operate properly, as planned, due to any of the above causes, all within one (1) year after date on which the work is accepted by the Agency, then the undersigned agrees the repairs shall be made and such materials as are necessary shall be furnished and installed within thirty (30) days after the receipt of demand from the Agency; provided, that if the Contract Documents require a longer guaranty period, then the longer period shall apply. In the event repairs are not made within thirty (30) days, the Agency shall have the unqualified option to make any needed repairs or replacements itself or by any other contractor. The Contractor agrees to reimburse the Agency, upon demand, of its expenses incurred in restoring said items to the condition contemplated in the Contract, including the cost of any equipment or materials replaced, or upon demand by the Agency, to replace any such equipment and repair said items completely without cost to the Agency so that they will operate successfully as originally contemplated.

Emergency repairs must necessarily be made by the Agency; therefore, when defective material or workmanship results in emergency repairs, the undersigned agrees to reimburse the Agency, upon demand, expenses incurred.

Each item will be deemed defective within the meaning of this guaranty in the event that item fails to operate as originally intended thereof and in accordance with the plans and specifications included in the Contract. The Faithful Performance Bond required for the Contract shall remain in full force and effect for the entire first year of the applicable guarantee period.

_____________________________ ________________________________ Date (Print Name of Contractor, Company or Corporation)

________________________________
Signature

-40-

Standard Specifications
Specifications No. 21/22-02
SS-1

CITY OF BELLFLOWER

PUBLIC WORKS DEPARTMENT

STANDARD SPECIFICATIONS

Except as modified by these Standard Specifications, the provisions of the latest edition of the “Standard Specifications for Public Works Construction” (“Greenbook”) and its supplements prepared and promulgated by the Southern California Chapters of the American Public Works Association and the Associated General Contractors of America, constitute the Standard Specifications for this project. THESE STANDARD

SPECIFICATIONS ARE INTENDED TO, AND DO, TAKE PRECEDENCE OVER ANY CONFLICTING PROVISION OF THE GREENBOOK.

1. NUMBERING OF SECTIONS

The numbering of these Standard Specifications is NOT intended to conform with the Greenbook. Rather, the numbering is specific for these Standard Specifications. As noted at the outset, however, the provisions contained within these Standard Specifications supersede any conflicting clauses within the Greenbook and govern the contractual relationship between the Parties.

2. MODIFICATIONS

To the extent that the provisions of the Contract Documents conflict with the Green Book, the Contract Documents take precedence.

3. DEFINITIONS

Unless the contrary is stated or clearly appears from the context, the following definitions will govern the construction of the words and phrases used in these Standard Specifications.

Acceptance – The date on which the City Council accepts the Work as complete.

Architect, Design Engineers, Soils Engineer, Structural Engineers – Advisors employed by the City.

Bidder – Any individual, firm, partnership, corporation, or combination thereof, submitting a proposal for the work contemplated, acting directly or through a duly authorized representative.

Compensable Delay – a delay entitling the Contractor to an adjustment of the Contract Sum and an adjustment of the Contract Time in accordance with this Agreement.

Due Notice – A written notification, given in due time, of a proposed action where such notification is required by the contract to be given a specified interval of time (usually 48 hours or two working days) before the commencement of the contemplated action. -41-

Standard Specifications
Specifications No. 21/22-02
SS-2

Notification may be from Public Works Director to Contractor or from Contractor to Public Works Director.

Public Works Director – The City Public Works Director, or designee, as defined in the Greenbook. Unless otherwise provided, all correspondence and decisions made relative to the contract will be by the City Public Works Director or designee.

PCC – California Public Contract Code.

Prompt – The briefest interval of time required for a considered reply, including time required for approval of a governing body.

(Check if applicable) State Standard Specifications - State of California Standard Specifications ( https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard- specifications).

Working Days – A working day is defined as any day, except Saturdays, Sundays, legal holidays and days when work is suspended by the Public Works Director.

4. ABBREVIATIONS
AAN American Association of Nurserymen
AGC Associated General Contractors of America
AISC American Institute of Steel Construction
APWA American Public Works Association
ASA American Standard Association
ASME American Society of Mechanical Engineers
CA MUTCD California Manual on Uniform Traffic Control Devices IEEE Institute of Electric and Electronic Engineers
NEC National Electric Code
Greenbook The most current edition of the Standard Specifications for Public Works Construction, and subsequent supplements prepared by Public Works Standards, Inc.

SPPWC Standard Plans for Public Works Construction by the American Public Works Association
SSPWC Standard Specifications for Public Works Construction by the American Public Works Association

5. ACCESS TO PROJECT SITE

Not later than the date designated in the City Notice to Proceed, the City will provide access to the real property and facilities upon which the Work is to be performed, including access to real property and facilities designated in the Contract Documents for the Contractor’s use.

6. SUBCONTRACTOR LISTING

Except as provided in PCC §§ 4100, et seq., each bidder will file with its bid the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work -42-

Standard Specifications
Specifications No. 21/22-02
SS-3

or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specifically fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent of the prime contractor’s total bid. Only one subcontractor will be listed for each portion of the work, which portion will be defined in the bid. In each instance, the nature and extent of the work to be sublet will be described. The failure of the Contractor to specify a subcontractor, or the listing of more than one subcontractor for the same portion of the work, constitutes an agreement by the Contractor that it is fully qualified to perform that portion itself and that it will perform that portion itself.

The Contractor must have the City Council’s written consent to substitute a subcontractor other than that designated in the original bid, to permit any subcontract to be assigned or transferred, or to allow a subcontract to be performed by other than the original subcontractor.

Subcontracting of work for which no subcontractor was designated in the original bid, and which is more than one-half of one percent of the work, will be allowed only in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the City Council setting forth the facts constituting the emergency or necessity.

Violation of any of the above provisions will be considered a breach of the Contract, and the City may terminate the Contractor’s control over the Work, cancel the contract, or assess the Contractor a penalty of not more than 10 percent of the subcontract involved.

All persons engaged in the work, including subcontractors and their employees will be considered as employees of the Contractor. The Contractor will be solely responsible for and have control over construction means, methods, techniques, sequences, procedures, and the coordination of all portions of the Work. The City will deal directly with, and make all payments to, the prime Contractor.

When subcontracted work is not being prosecuted in a satisfactory manner, the Contractor will be notified to take corrective action. The Public Works Director may report the facts to the City Council. If the City Council so orders, and on receipt by the Contractor of written instructions from the Public Works Director, the subcontractor will be removed immediately from the Work. That subcontractor will not again be employed on the Work.

If licensure or proper licensure is controverted, then proof of licensure pursuant to this section must be made by production of a verified certificate of licensure from the Contractors’ State License Board which establishes that the individual or entity bringing the action was duly licensed in the proper classification of contractors at all times during the performance of any act or contract covered by the action. Nothing in this subdivision requires any person or entity controverting licensure or proper licensure to produce a verified certificate. When licensure or proper licensure is controverted, the burden of proof to establish licensure or proper licensure is on the licensee.

-43-

Standard Specifications
Specifications No. 21/22-02
SS-4

The Contractor will submit experience statements for each subcontractor who will perform contract work that amounts to more than 10% of the Work.

7. CONTRACT BONDS

The Faithful Performance Bond and the Labor and Materials Bond must be paid and in effect for one year after the acceptance of the job by the City in accordance with the guarantee required by the Greenbook.

The term “surety bond,” “guarantee,” and “bond” also includes such other acceptable security, such as letters of credit or cash deposit agreements issued by responsible financial institutions, which are approved by the City Attorney. Sureties must be admitted to do business in California.

8. CONTRACT DOCUMENTS

The Contractor will maintain the following at the Work site:

• One as-built copy of the Plans and Specifications, in good order and marked to record current changes and selections made during construction. As-built plans must be submitted to the City representative for approval before the City pays a final retention amount.

• The current accepted Contract Schedule.

• Shop Drawings, Product Data, and Samples.

• Approved permits from other agencies, including Cal-OSHA permits for trench shoring.

• All other required submittals.

The Plans, Specifications, and other Contract Documents will govern the Work. The Contract Documents are intended to be complementary and cooperative and to describe and provide for a complete project. Anything in the Specifications and not on the Plans, or on the Plans and not in the Specifications, will be as though shown or mentioned in both.

Payment for any items on the plans for which there is no specific bid item will be included in the various items of work or in any item to which it is appurtenant.

If the Contractor performs any work which it knows or should know involves an error, inconsistency, or omission without notifying and obtaining written consent from the Public Works Director, the Contractor will be responsible for the resulting losses, including, without limitation, the costs of correcting defective work.

9. PRECEDENCE OF CONTRACT DOCUMENTS

-44-

Standard Specifications
Specifications No. 21/22-02
SS-5

As the figured dimensions shown on the plans and in the specifications of the Contract may not in every case agree with scaled dimensions, the figured dimensions will be followed in preference to the scaled dimensions and plans to a large scale will be followed in preference to the plans to a small scale. Should it appear that the work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained in the Contract, the Contractor will apply to the Public Works Director for such further explanations as may be necessary and will conform thereto as part of the Contract so far as may be consistent with the terms thereof. Any items shown on drawings and not mentioned in the specifications will be of like effect as if shown or mentioned in both.

10. ACCURACY OF PLANS AND SPECIFICATIONS

Although it is believed that much of the information pertaining to conditions and existing utilities that may affect the cost of the Work will be shown on the Plans or indicated in the Specifications, the City does not warrant the completeness or accuracy of such information.

The Contractor will carefully study and compare each of the Contract Documents with the others and with information furnished by the City and will promptly report in writing to the Public Works Director any errors, inconsistencies, or omissions in the Contract Documents or inconsistencies with applicable law observed by the Contractor.

The Contractor will take field measurements, verify field conditions, perform soil investigations, and carefully compare with the Contract Documents such field measurements, conditions, and other information known to the Contractor before commencing the Work. Errors, inconsistencies, or omissions discovered at any time will be promptly reported in writing to the Public Works Director.

11. RIGHT-OF-WAY

When the Contractor arranges for additional temporary work areas and facilities, the Contractor will provide the City with proof that the additional work areas or facilities were left in a condition satisfactory to the owner(s) of said work areas or facilities before acceptance of the work.

12. SURVEYING

The Contractor will provide for all construction surveying required to layout, monitor and complete the work. The surveying will be performed by a Land Surveyor or Civil Engineer authorized to practice land surveying by the State of California.

The Project Benchmark is shown on the plans. The Contractor will establish all necessary control lines based on the plans and record information on file with the County of Los Angeles Surveyor and the Public Works Director.

It is the Contractor’s responsibility to protect the survey control as shown on the plans.

If the survey control is destroyed or disturbed during construction, the Contractor will -45-

Standard Specifications
Specifications No. 21/22-02
SS-6

provide for resetting them and file appropriate documents with the County of Los Angeles at the direction of the Public Works Director.

Computations, survey notes, and other data used to accomplish the work will be neat, legible and accurate. Copies of all computations, survey notes, and other data (electronic format may be required) will be furnished to the Public Works Director before beginning work that requires their use.

13. MEASUREMENT AND PAYMENT

Construction Survey – Unless a separate bid item is provided, payment will be considered included in the other items of the bid and no additional payment will be made therefore.

14. BASIS FOR ESTABLISHING COSTS

Regardless of ownership, the rates to be used in determining the equipment usage costs will not exceed those listed for the same or similar equipment in the California State Department of Transportation publication of Labor Surcharge and Equipment Rates effective for the period of usage.

15. MARK UP

Work by Contractor. The following percentages will be added to the Contractor’s costs and will constitute the markup for all overhead and profits.

Labor .................................................... 20 Materials .................................................... 15 Equipment Rental .................................................... 15 Other Items and Expenditures .............................................. 15

To the sum of the costs and markups provided for in this subsection, 1 percent will be added as compensation for bonding. No other formula, e.g., the Eichleay or other method, may be used to calculate daily damages for office overhead, profit, or other purported loss.

Work by Subcontractors. When all or any part of the extra work is performed by a Subcontractor, the markup established in this Section will be applied to the Subcontractor’s actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.

In the event that City becomes liable to Contractor for compensable delays, City agrees to pay Contractor the daily Contractor Delay Damages set forth in the Bid Form or Contractor’s actual daily delay damages, whichever is less, for each day of Compensable Delay as provided for by these Contract Documents.

-46-

Standard Specifications
Specifications No. 21/22-02
SS-7

16. DAILY REPORTS BY CONTRACTOR

If disagreement continues regarding extra work, the Contractor may seek compensation in accordance with the Claims procedure. Daily Reports required by this subsection must be made part of the Claim as supporting data for the Claim.

17. CHANGED CONDITIONS

If the Contractor encounters concealed or unknown conditions that differ materially from those anticipated or expected (“changed conditions”), the Contractor will immediately notify the Public Works Director in writing of such changed conditions (upon discovery and before disturbing such changed conditions), so that the Public Works Director can determine if such conditions require design details that differ from those design details shown in the Contract Documents. Notwithstanding any other time period, the Contractor is liable to City for any extra costs incurred as a result of the Contractor’s failure to promptly give such notice.

Changed conditions include, without limitation, the following:

• Subsurface or latent physical conditions differing materially from those represented in the Contract Documents;

• Unknown physical conditions of an unusual nature differing materially from those ordinarily encountered and generally recognized as inherent in work of the character being performed; and

• Material differing from what is represented in the Contract which the Contractor believes may be hazardous waste as defined in California Health & Safety Code § 25117 that is required to be removed to a Class I, II, or III disposal site in accordance with applicable law.

The Public Works Director will promptly investigate conditions that appear to be changed conditions. The Public Works Director’s decision, and any dispute regarding that decision, will be made in accordance with the Greenbook except that the Public Works Director will render a decision promptly.

Any information provided pursuant to INFORMATION AVAILABLE TO BIDDERS is subject to the following provisions:

• The information is made available for the Bidders’ convenience and is not a part of the Contract.

• The City has not determined the accuracy or completeness of such information and all such information is made available to Bidders without any representation or warranty by the City whatsoever as to its accuracy, completeness, or relevancy.

-47-

Standard Specifications
Specifications No. 21/22-02
SS-8

• Bidders will independently evaluate such information for their use and will be solely responsible for use or interpretation of such information. Any such use or interpretation will not be the basis of any claim against the City.

18. DISPUTED WORK

If the Contractor and the City do not reach agreement on disputed work, the City may direct the Contractor to proceed with the work. Any payment for the disputed work will be determined pursuant to the claims procedures in these Standard Specifications.

Although not to be construed as proceeding under extra work provisions, the Contractor will keep and furnish records of disputed work as required by the Contract Documents.

19. INSPECTION REQUIREMENTS

Unless otherwise specified, inspection at the source of production for such materials and fabricated items as bituminous paving mixtures, structural concrete, fabricated metal products, cast metal products, welding, reinforced and unreinforced concrete pipe, application of protective coatings, and similar shop and plant operations is not required. A certificate of compliance, signed by an authorized officer of the producer, certifying compliance with the contract documents will be submitted for all of the following materials: steel pipe, sizes less than 18 inches; vitrified clay pipe; asbestos cement pipe; cast iron pipe; reinforced concrete pipe; non-reinforced concrete pipe; and PVC sewer and water pipe; subject to sampling and testing by City.

Standard items of equipment, such as electric motors, conveyors, plumbing fittings and fixtures, lumber, plywood, and so on, are subject to inspection at the job site.

All other equipment items will be inspected and tested in accordance with the contract documents.

The City does not provide full time inspection. The Contractor will provide 24-hour minimum notice for each inspection required by the work unless other arrangements have been agreed upon, in writing, with the Public Works Director. Any inspection required outside of normal working hours and days, including holidays, will be at the Contractor’s cost at rates established by the City.

20. INSPECTION OF MATERIALS NOT PRODUCED LOCALLY

Contractor purchased materials, fabricated items, and equipment, produced at sources located more than 50 miles outside the corporate limits of the City, and which are specified to be inspected in the Contract Documents, will be inspected by inspectors or testing laboratories arranged for and paid for by City. Report of such inspection must be submitted to the City. If any item inspected fails to meet the specified criteria, the Contractor will pay all costs for reinspection, and such costs may be deducted from payments due to the Contractor.

21. TRADE NAMES OR EQUALS
-48-

Standard Specifications
Specifications No. 21/22-02
SS-9

Whenever any material, product, equipment, or service is specified by brand, trade, or proprietary name, the item so specified will be deemed to be followed by the words “or equal.”

For the City’s consideration of a proposed “equal” item, the Bidder must submit, a minimum of 10 calendar days before the date of the bid opening, documentation of the particulars of the proposed “equal item.” At a minimum, the submitted documentation will include:

• Written request with explanation of why the product should be considered as an equal product.
• Material specifications.
• Technical specifications.
• Test data.
• Samples.
• Comparison chart of key specifications of the “equal” item against similar specifications of the specified item.
• Work locations and reference telephone numbers of at least three (3) locations where the proposed “equal” item has been recently installed under similar conditions.
• Warranty data.

The Bidder will be notified by the Public Works Director whether or not the proposed “equal” product is acceptable to the City five calendar days before the date of the bid opening. Failure to submit all required documentation and/or submittal of incomplete documents may result in the City’s rejection of the proposed “equal” product without further consideration.

22. PROTECTION

If the Contractor, while performing the Work, discovers utility facilities not identified correctly or not shown in the contract plans or specifications by the City, the Contractor will immediately notify the City and utility owner in writing.

23. RESPONSIBILITY OF UTILITY REMOVAL OR RELOCATION

The City is responsible to arrange for the removal, repair, or relocation of existing utilities located within the project limits if such utilities are not correctly identified in the contract plans or specifications by the City. The City has sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation.

24. DELAYS

Actual loss is understood to include no items of expense other than idle time of equipment and necessary payments for idle time of workers, cost of extra moving of equipment, and cost of longer hauls. Compensation for idle time of equipment and idle time of workers will be determined by these Standard Specifications and no markup will -49-

Standard Specifications
Specifications No. 21/22-02
SS-10

be added in either case for overhead and profit. The cost of extra moving of equipment and the cost of longer hauls will be paid for as extra work.

25. CALCULATING IDLE TIME

Equipment and worker idle time is calculated in accordance with these Standard Specifications and the Greenbook; it is based upon the actual normal working time during which the delay condition exists, but in no case will exceed 8 hours in any one day. The days for which compensation will be paid will be the calendar days, excluding Saturdays, Sundays and legal holidays, during the existence of the delay.

26. CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK

A. Pre-Construction Meeting:

After contract award, City will arrange for a pre-construction meeting to discuss the construction of the project. City will invite utility agencies and the contractor will arrange for all of its sub-contractors to attend the meeting.

B. Contract Schedule

After notification of award and before starting any work, the Contractor will submit a Contract Schedule to the Public Works Director for review, as required by these Standard Specifications within 15 calendar days of award.

C. Contract Schedule Content

The Contract Schedule, and any updated Contract Schedule, will meet the following requirements:

• Schedules must be suitable for monitoring progress of the Work. • Schedules must provide necessary data about the time for the Public Works Director’s decisions.
• Schedules must be sufficiently detailed to demonstrate adequate planning for the Work.
• Schedules must represent a practical plan to complete the Work within the Contract Time.
• Schedules must show the critical path method for completing the Work.

The Public Works Director’s review of the form and general content of the Contract Schedule and any updated Contract Schedules is only for the purpose of determining if the listed requirements are satisfied, nothing more.

D. Effect of Contract Schedule

The Contract Schedule, and any updated Contract Schedules, will represent a practical plan to complete the Work within the Contract Time. Extension of any schedule beyond the Contract Time will not be acceptable. Schedules showing the Work completed in -50-

Standard Specifications
Specifications No. 21/22-02
SS-11

less than the Contract may be acceptable if judged by the Public Works Director to be practical. Acceptance of such a schedule by the Public Works Director will not change the Contract Time. The Contract Time, not the Contract Schedule, will control in determining liquidated damages payable by the Contractor and in determining any delay.

If a schedule showing the Work completed in less than the Contract Time is accepted, the Contractor will not be entitled to extensions of the Contract Time for Excusable Delays or Compensable Delays or to adjustments of the Contract Sum for Compensable Delays until such delays extend the completion of the Work beyond the expiration of the Contract Time.

The Contractor will plan, develop, supervise, control, and coordinate the performance of the Work so that its progress and the sequence and timing of Work activities conform to the current accepted Contract Schedule. The Contractor will continuously obtain from Subcontractors information and data about the planning for and progress of the Work and the delivery of equipment, will coordinate and integrate such information and data into updated Contract Schedules, and will monitor the progress of the Work and the delivery of equipment. The Contractor will act as the expeditor of potential and actual delays, interruptions, hindrances, or disruptions for its own forces and those forces of Subcontractors. The Contractor will cooperate with the Public Works Director in developing the Contract Schedule and updated Contract Schedules.

The Public Works Director’s review and comments about any schedule or scheduling data will not relieve the Contractor from its sole responsibility to plan for, perform, and complete the Work within the Contract Time. Review and comments about any schedule will not transfer responsibility for any schedule to the Public Works Director or City nor imply their agreement with (1) any assumption upon which such schedule is based or (2) any matter underlying or contained in such schedule.

The Public Works Director’s failure to discover errors or omissions in schedules that have been reviewed, or to inform the Contractor that the Contractor, Subcontractors, or others are behind schedule, or to direct or enforce procedures for complying with the Contract Schedule will not relieve the Contractor from its sole responsibility to perform and complete the Work within the Contract Time and will not be a cause for an adjustment of the Contract Time or the Contract Sum.

The Contractor will perform the Work in accordance with the currently accepted Contract Schedule.

E. Commencement of Contract Time

The Contract Time will commence when the City issues a Notice to Proceed. The Work will start on the date specified in the Notice to Proceed and within a maximum of 15 calendar days after the date of the Notice to Proceed and be diligently prosecuted to completion with the time provided in the Specifications.

27. DEFAULT BY CONTRACTOR
-51-

Standard Specifications
Specifications No. 21/22-02
SS-12

A. General

Should the Contractor fail to begin delivery of material and equipment, to commence the Work within the time specified, to maintain the rate of delivery of material, to execute the Work in the manner and at such locations as specified, or fail to maintain the Work schedule (as determined by the current accepted Contract Schedule) which will ensure the City’s interest, or if the Contractor is not carrying out the intent of the Contract, the City may serve written notice upon the Contractor and the Surety on its Faithful Performance Bond demanding satisfactory compliance with the Contract.

B. Termination of Contractor’s Control Over the Work

City may terminate the Contractor’s control over the Work without liability for damages when, in the City’s opinion, the Contractor is not complying in good faith, has become insolvent, or has assigned or subcontracted any part of the Work without the City’s consent. Should such termination occur, the Contractor will be paid the actual amount due based on Contract Unit Prices or lump sums bid and the quantity and quality of the Work completed at the time of termination, less damages caused to the City by the Contractor’s action or inaction.

In the event of such termination of control, the City may do any one, or combination of, the following:

• Serve written notice upon the Surety on its Faithful Performance Bond demanding satisfactory compliance with the Contract. In such event the Surety will, within 5 days, assume control and perform the Work as successor to the Contractor;
• The City may perform the Work itself and deduct the cost thereof from any payment due to the Contractor;
• The City may replace the Contractor with a different contractor to complete the work and deduct the cost thereof from any payment due to the Contractor.

Nothing herein will waive, or serve as a limitation upon, any additional remedy the City may have under these Contract Documents or applicable law.

C. Surety’s Assumption of Control

Should the Surety assume any part of the Work, it will take the Contractor’s place in all respects for that part and will be paid by the City for all work performed by it in accordance with the Contract. If the Surety assumes the entire Contract, all money due the Contractor at the time of its default will be payable to the Surety as the Work progresses, subject to the terms of the Contract.

If the Surety does not assume control and perform the Work within five days after receiving notice of cancellation, or fails to continue to comply, the City may exclude the Surety from the premises. The City may then take possession of all material and equipment and complete the Work by City’s forces, by letting the unfinished work to -52-

Standard Specifications
Specifications No. 21/22-02
SS-13

another contractor, or by a combination of such methods. In any event, the cost of completing the Work will be charged against the Contractor and its Surety and may be deducted from any money due or becoming due from the City. If the sums due under the Contract are insufficient for completion, the Contractor or Surety will pay to the City within five days of completion, all costs in excess of the sums due.

The provisions of this subsection will be in addition to all other rights and remedies available to the City under applicable law.

28. DELAYS AND EXTENSIONS OF TIME

A. General

If delays are caused by unforeseen events beyond the control of the Contractor, such delays will entitle the Contractor to an extension of time as provided herein, but the Contractor will not be entitled to damages or additional payment due to such delays except as otherwise provided herein. Excusable delay may include war, earthquakes exceeding 3.5 on the Richter Scale, government regulation, labor disputes outside the contemplation of the parties, strikes outside the contemplation of the parties, fires, floods, changes to the Work as identified herein, or other specific events that may be further described in the Specifications.

Delays to the project caused by labor disputes or strikes involving trades not directly related to the project, or involving trades not affecting the project as a whole will not warrant an extension of time.

The City will not grant an extension of time for a delay by the Contractor’s inability to obtain materials unless the Contractor furnishes to the Public Works Director documentary proof. The proof must be provided in a timely manner in accordance with the sequence of the Contractor’s operations and accepted construction schedule.

Should delays be caused by events other than those included herein, the Public Works Director may, but is not required to, deem an extension of time to be in the City’s best interests.

B. Extensions of Time

If granted, extensions of time will be based upon the effect of delays to the critical path of the Work as determined by the current accepted Contract Schedule. Delays to minor portions of the Work that do not affect the critical path will not be eligible for extensions of time.

C. Payment for Delays to Contractor

Any payment for compensable delay will be based upon actual costs excluding, without limitation, what damages, if any, the Contractor may have reasonably avoided.

The Contractor understands that this is the sole basis for recovering delay damages and explicitly waives any right to calculate daily damages for office overhead, profit, or -53-

Standard Specifications
Specifications No. 21/22-02
SS-14

other purported loss, using different formulas including, without limitation, the Eichleay Formula.

D. Written Notice and Report

If the Contractor desires payment for a delay or an extension of time, it will give the Public Works Director written notice of such request not later than the time limit set forth in the Proposal for submitting a claim after the event or occurrence giving rise to a delay claim. Failure to submit a written request within such amount of time will result in the Contractor waiving its delay claim.

Any claim for payment or an extension of time must be in the form required by the “Claims” sections of these Standard Specifications.

In no event will the City grant the Contractor an extension of time if the delay is within the Contract Time as identified by the Contract Documents.

29. WORKDAYS AND WORKING HOURS

City Hall is ordinarily open from Monday thru Thursday during normal working hours (8 a.m. to 5:30 p.m.) and alternating Fridays (8 a.m. to 4:30 p.m.). It is closed on the following holidays:

New Year’s Day - January 1
Martin Luther King, Jr. Day - January 18
President’s Day - February 16
Memorial Day - May 31
Independence Day - July 4
Labor Day - September 6
Veterans’ Day - November 11
Thanksgiving - November 25
Friday after Thanksgiving - November 26
Christmas Eve - December 24
Christmas - December 25
New Year’s Eve - December 31

If the Contractor requests an inspection on a day when City Hall is closed, then the Contractor will have to reimburse the City for the costs of inspection. The Contractor must request such an inspection at least 48 hours in advance. City inspections during hours when City Hall is closed are subject to inspection overtime fees to be paid for by the Contractor. Friday work that does not require inspection can be done without an inspection fee and must be discussed with City staff before its occurrence. If the Contractor does construction on a Friday or a day when City Hall is closed, that day is counted as a project working day.

On workdays, Contractor’s activities will be confined to the hours between 7:30 a.m. and 4:00 p.m. Traffic may only be restricted between the hours of 7:30 am and 2:00 pm and subject to the review of the City Manager.
-54-

Standard Specifications
Specifications No. 21/22-02
SS-15

A. Night Work

Except as otherwise provided in the Technical Specifications or separate permit, City does not permit Work between the hours of 4 p.m. and 7:30 a.m. of the following day.

B. Weekend and Holiday Work

The Public Works Director may, but is not required to, allow the Contractor to work on Saturdays, Sundays and City Holidays.

30. COMPLETION AND ACCEPTANCE

The Work will be inspected by the Public Works Director for acceptance upon the Public Works Director receiving the Contractor’s written assertion that the Work is complete.

If, in the Public Works Director’s judgment, the Work is complete and is ready for acceptance, the Public Works Director will accept the Work on behalf of the City in the manner prescribed by the City. Once a Notice of Completion is issued, the Contractor is relieved from responsibility to protect the Work.

All work will be guaranteed by the Contractor against defective workmanship and materials furnished by the Contractor for a minimum period of one year from the date the Work was completed. The Contractor will replace or repair any such defective work in a manner satisfactory to the Public Works Director, after notice to do so from the Public Works Director, and within the time specified in the notice. If the Contractor fails to make such replacement or repairs within the time specified in the notice, the City may perform this work and the Contractor’s sureties will be liable for the cost thereof.

31. LIQUIDATED DAMAGES

If all the Work is not completed before or upon the expiration of the Contract Time, City will sustain damage. Since it is and will be impracticable to determine the actual damage which the City will sustain in the event of and by reason of such delay, it is agreed that the Contractor will pay to the City the sum specified in the Proposal for each and every calendar day beyond the time prescribed to complete the work not as a penalty, but as a predetermined liquidated damage. The Contractor agrees to pay such liquidated damages as are herein provided, and in case the same are not paid, agrees that the City may deduct the amount thereof from any money due or that may become due to the Contractor under the contract.

Unless otherwise specified, liquidated damages will be $1,000 per calendar day.

32. DISPUTES AND CLAIMS; PROCEDURE

A. General

-55-

Standard Specifications
Specifications No. 21/22-02
SS-16

Consistent with PCC §§ 9204 and 10240.6, “Claim” means a written demand or assertion by the Contractor that seeks an adjustment or interpretation of the terms of the Contract Documents, payment of money, extension of time, or other relief with respect to the Contract Documents, including a determination of disputes or matters in question between the City and the Contractor arising out of or related to the Contract Documents or the performance of the Work, and claims alleging an unforeseen condition or an act, error, or omission by the City, the Public Works Director, their agents or employees. “Claim” does not mean, and the Claims procedures herein do not apply, to the following:

• Claims respecting penalties for forfeitures prescribed by statute or regulations, which a government agency is specifically authorized to administer, settle, or determine.
• Claims respecting personal injury, death, reimbursement, or other compensation arising out of or resulting from liability for personal injury or death. • Claims respecting a latent defect, breach of warranty, or guarantee to repair. • Claims respecting stop notices.

If a Claim is subject to the Change Order procedures, the Claim arises upon the issuance of a written final decision denying in whole or in part the Contractor’s Change Order Request. If a Claim is not subject to the Change Order Procedures, the Claim arises when the Contractor discovers, or reasonably should discover, the condition or event giving rise to the Claim. The requirements of this Section are intended to supplement and implement PCC § 9204, a copy of which is attached for reference.

Accordingly, pursuant to PCC § 9204(f), the parties agree to utilize these Standard Specifications.

B. Form

A Claim must include the following:

• A statement that it is a Claim and a request for a decision.

• A detailed description of the act, error, omission, unforeseen condition, event or other condition giving rise to the Claim.

• If the Claim is subject to the Change Order procedures, a statement demonstrating that a Change Order Request was timely submitted and denied.

• A detailed justification for any remedy or relief sought by the Claim, including to the extent applicable, the following:

 If the Claim involves extra work, a detailed cost breakdown claimed. The breakdown must be provided even if the costs claimed have not been incurred when the Claim is submitted.

 To the extent costs have been incurred when the Claim is submitted, the Claim must include actual cost records (including, without limitation, -56-

Standard Specifications
Specifications No. 21/22-02
SS-17

payroll records, material and rental invoices) demonstrating that costs claimed have actually been incurred.

 To the extent costs have not yet been incurred at the time the Claim is submitted, actual cost records must be submitted on a current basis not less than once a week during any time period costs are incurred. A cost record will be considered current if submitted within seven calendar days of the date the cost reflected in the record is incurred. At the Public Works Director’s request, claimed extra costs may be subject to further verification procedures (such as having an inspector verify the performance of alleged extra work on a daily basis).

• If the Claim involves an error or omission in the Contract Documents:

 An affirmative representation that the error or omission was not discovered before submitting a bid for the Contract; and

 A detailed statement demonstrating that the error or omission reasonably should not have been discovered by the Contractor, its Subcontractors and suppliers, before submitting a bid for the Contract.

• If the Claim involves an extension of the Contract Time, written documentation demonstrating the Contractor’s entitlement to a time extension.

• If the Claim involves an adjustment of the Contract Sum for delay, written documentation demonstrating the Contractor’s entitlement to such an adjustment.

• A personal certification from the Contractor that reads as follows:

“I, , BEING THE (MUST BE AN

OFFICER) OF (CONTRACTOR
NAME),

DECLARE UNDER PENALTY OF PERJURY UNDER CALIFORNIA LAW, AND DO

PERSONALLY CERTIFY AND ATTEST THAT I HAVE THOROUGHLY REVIEWED

THE ATTACHED CLAIM FOR ADDITIONAL COMPENSATION OR EXTENSION OF TIME, AND KNOW ITS CONTENTS, AND SAID CLAIM IS MADE IN GOOD FAITH; THE SUPPORTING DATA IS TRUTHFUL AND ACCURATE; THAT THE AMOUNT

REQUESTED ACCURATELY REFLECTS THE CONTRACT ADJUSTMENT FOR WHICH THE CONTRACTOR BELIEVES CITY IS LIABLE; AND, FURTHER, THAT I AM FAMILIAR WITH CALIFORNIA PENAL CODE § 72 AND CALIFORNIA GOVERNMENT CODE § 12650, ET SEQ., PERTAINING TO FALSE CLAIMS, AND

FURTHER KNOW AND UNDERSTAND THAT SUBMITTING OR CERTIFYING A

FALSE CLAIM MAY LEAD TO FINES, IMPRISONMENT, AND OTHER SEVERE LEGAL CONSEQUENCES.”

C. Claims Submitted to Public Works Director

-57-

Standard Specifications
Specifications No. 21/22-02
SS-18

Within 30 calendar days after the circumstances giving rise to a Claim occur, the Contractor will submit its Claim to the Public Works Director for a decision. Regardless of any Claim submittal, or any dispute regarding a Claim, unless otherwise directed by the Public Works Director, the Contractor will not cause any delay, cessation, or termination of the Work, but will diligently proceed with the performing the Work in accordance with the Contract Documents. Except as otherwise provided, the City will continue to make payments in accordance with the Contract Documents.

D. Claim Is Prerequisite to Other Remedy

The Contractor certifies that it is familiar with PCC § 10240.2 and understands and agrees that submitting a Claim in accordance with these Specifications is an express condition precedent to the Contractor’s right to otherwise pursue a claim whether through alternative dispute resolution or by litigation. Should the Contractor fail to submit a claim in accordance with these Specifications, including the time limits set forth herein, it will waive any right to a remedy, whether in law or equity, it might otherwise have pursuant to the Contract Documents or applicable law.

E. Decision on Claims

The Public Works Director will promptly review Claims submitted by the Contractor in accordance with these Standard Specifications. Should the Public Works Director require additional supporting evidence to evaluate the claim, the Public Works Director will request such additional information in writing. Any such requested data will be furnished not later than 10 calendar days after the Contractor receives the Public Works Director’s request.

The Public Works Director will render a decision not later than 30 calendar days after either receiving the Claim or the deadline for furnishing additional supporting data, whichever is later. If the Claim amount is more than $50,000, the time period will be extended to 60 days. If the Public Works Director fails to render a decision within the time period established herein, then the Claim will be deemed denied. The Public Works Director’s decision will be final and binding unless appealed in accordance with these Specifications.

The Public Works Director’s decision on a Claim will include a statement substantially as follows:

“This is a decision pursuant to the Standard Specifications of your contract. If you are dissatisfied with the decision and have complied with the procedural requirements for asserting claims, you may have the right to alternative dispute resolution or litigation.

Should you fail to take appropriate action within 30 calendar days of the date of this decision, the decision will become final and binding and not subject to further appeal.”

F. Appeal of Public Works Director’s Decision

Should the Contractor dispute the Public Works Director’s decision, then the Contractor must appeal that decision to the City Manager within 30 calendar days of receiving the Public Works Director’s decision.
-58-

Standard Specifications
Specifications No. 21/22-02
SS-19

The City Manager will address disputes or claims within 30 calendar days after receiving such request and all necessary supporting data. The City Manager’s decision on the dispute or claim will be the City’s final decision.

If the Contractor disputes the City Manager’s decision, then the Contractor must demand alternative dispute resolution in accordance with this Section and the PCC within 30 calendar days of the City’s final decision.

G. Mediation

If the City and the Contractor agree, disputes between the parties may be submitted to non-binding mediation. If the parties cannot agree to an alternative form of mediation, then mediation will be administered by the American Arbitration Association (“AAA”) under its Construction Industry Mediation Rules, unless the use of such rules are waived by mutual stipulation of both parties.

The parties may, but are not required to be, represented by counsel in mediation.

The requirement for mediation will not alter or modify the time limitations otherwise provided for claims and no conduct or settlement negotiation during mediation will be considered a waiver of the City’s right to assert that claim procedures were not followed.

H. Arbitration

If the City and Contractor do not agree to mediation, then disputes will be submitted to neutral non-binding (except as provided herein) arbitration. Arbitration will be conducted in accordance with PCC § 10240.3. Any decision rendered by an arbitrator will be consistent with PCC § 10240.8.

The exclusive venue for any arbitration will be in Los Angeles County.

The expenses and fees of the arbitrators and the administrative fees, if any, will be divided among the parties equally. Each party will pay its own counsel fees, witness fees, and other expenses incurred for its own benefit.

I. When Arbitration Decision Becomes Binding

The decision rendered by the arbitrator will become binding upon the parties unless appealed to the Los Angeles County Superior Court pursuant to PCC § 10240.12 within 30 calendar days of the decision. If subsequent litigation results in an award to the party appealing the arbitration that is less than or equal to that of the arbitration decision, or if the litigation results in a decision in favor of the nonappealing party, then the party appealing the arbitration will pay the nonappealing party’s attorney’s fees and court costs.

J. Appeal to Superior Court; Waiver of Jury Trial

-59-

Standard Specifications
Specifications No. 21/22-02
SS-20

Should a party timely object to the arbitration decision, it may file a petition with the Los Angeles County Superior Court in accordance with California Code of Civil Procedure (“CCP”) §§ 1285, et seq. Notwithstanding the limitations set forth in CCP § 1286.2, the court may vacate, correct, or adjust an arbitration award, and enter judgment in accordance with CCP § 1287.4, for any legal or equitable basis including, without limitation, error of law. The court will apply the substantial evidence standard of review when considering the appeal of an objecting party.

BY EXECUTING THESE CONTRACT DOCUMENTS, THE CONTRACTOR AGREES

TO HAVE DISPUTES OR CONTROVERSY CONCERNING THE CONSTRUCTION,

INTERPRETATION, PERFORMANCE, OR BREACH OF THESE CONTRACT

DOCUMENTS, INCLUDING CLAIMS FOR BREACH OF CONTRACT OR ISSUES OF BAD FAITH DECIDED IN ACCORDANCE WITH THIS SECTION. BOTH THE CITY

AND THE CONTRACTOR WAIVE THEIR RIGHT TO A JURY TRIAL FOR THESE DISPUTES OR ISSUES.

33. PREVAILING WAGES

The Contractor will post at appropriate conspicuous points at the site of the project a schedule showing determinations of the Director of Industrial Relations of the prevailing rate of per diem wages. It will be the Contractor’s responsibility to obtain copies of the prevailing rate of per diem wages. One source that may be used is the California Department of Industrial Relations website which is currently located at www.dir.ca.gov , or by calling the Prevailing Wage Unit at (415) 703-4774.

Attention is directed to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by the Contractor or any subcontractor.

Labor Code § 1777.5 requires the Contractor or subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate will also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except:

• When employment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 calendar days before the request for certificate, or

• When the number of apprentices in training in the area exceeds a ratio of one to five, or

• When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state-wide or locally, or

-60-

Standard Specifications
Specifications No. 21/22-02
SS-21

• When the Contractor provides evidence that the Contractor employs registered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen.

The Contractor is required to make contributions to funds established for the administration of apprenticeship programs if the Contractor employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions.

The Contractor and any subcontractor will comply with Labor Code §§ 1777.5 and 1777.6 in the employment of apprentices.

Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex-officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

34. RECORD OF WAGES PAID: INSPECTION

Every Contractor and subcontractor will keep an accurate certified payroll records showing the name, occupation, and the actual per diem wages paid to each worker employed in connection with the Work. The record will be kept open at all reasonable hours to the inspection of the body awarding the contract and to the Department of Industrial Relations. If requested by the City, the Contractor will provide copies of the records at its cost.

35. LIABILITY INSURANCE

Contractor must comply with City’s insurance requirements for public works projects which are either adopted by City Council resolution or promulgated by the City Manager, or designee (the “Insurance Matrix”). Contractor will provide endorsements or other proof of coverage for contractual liability in accordance with the Insurance Matrix.

The cost of such insurance will be included in the various items of work in the Contractor’s bid and no additional compensation for purchasing insurance or additional coverage needed to meet these requirements will be allowed.

In the event that any required insurance is reduced in coverage, cancelled for any reason, voided or suspended, Contractor agrees that City may arrange for insurance coverage as specified, and Contractor further agrees that administrative and premium costs may be deducted from payments due to the Contractor. Contractor will not be allowed to work until alternate coverage is arranged.

Coverage will not extend to any indemnity coverage for the active negligence of the additional insured if the agreement to indemnify the additional insured would be invalid under Civil Code § 2782(b).

36. INDEMNIFICATION AND DEFENSE
-61-

Standard Specifications
Specifications No. 21/22-02
SS-22

In addition to all other provisions of the Contract Documents including, without limitation, the Greenbook, as between the City and Contractor, Contractor will take and assume all responsibility for the work as stated herein or shown on the plans.

The Contractor will bear all losses and damages directly or indirectly resulting to it, to the City, its officers, employees, and agents, or to others on account of the performance or character of the work, unforeseen difficulties, accidents, traffic control, job site maintenance, or any other causes whatsoever.

The Contractor will assume the defense of and indemnify and save harmless the City of Bellflower, its officers, employees, and agents, from and against any and all claims, losses, damage, expenses and liability of every kind, nature, and description, directly or indirectly arising from the performance of the contract or work, regardless of responsibility for negligence, and from any and all claims, losses, damage, expenses, and liability, howsoever the same may be caused, resulting directly, or indirectly from the nature of the work covered by the contract, regardless of responsibility for negligence, to the fullest extent permitted by law. In accordance with Civil Code § 2782, nothing in this Section will require defense or indemnification for death, bodily injury, injury to property, or any other loss, damage or expense arising from the sole negligence or willful misconduct of the City, or its agents, servants or independent contractors who are directly responsible to the City, or for defects in design furnished by such persons. Moreover, nothing in this Section will apply to impose on the Contractor, or to relieve the City from, liability for active negligence of the City.

The City does not, and will not, waive any rights against the Contractor which it may have by reason of the aforesaid hold harmless agreements because of the acceptance by the City, or deposit with City by Contractor, of any insurance policies. This hold harmless agreement by the Contractor applies to all damages and claims for damages of every kind suffered or alleged to have been suffered by reasons of any of the aforesaid operations of Contractor, or any subcontractor, regardless of whether or not such insurance policies are determined to be applicable to any of such damages or claims for damages.

No act by the City, or its representatives in processing or accepting any plans, in releasing any bond, in inspecting or accepting any work, or of any other nature, will in any respect relieve the Contractor or anyone else from any legal responsibility, obligation or liability he might otherwise have.

37. PERMITS

The Contractor will apply for permits required by the City. These permits including, without limitation, a business license, will be issued on a “no-fee” basis. However, the Contractor must pay for and obtain all other permits from other governmental and utility agencies necessitated by their operations but cannot charge the City an administrative fee for obtaining such permits.

-62-

Standard Specifications
Specifications No. 21/22-02
SS-23

All bonding fees, (overweight and oversized vehicle permit fees) inspection permit fees or other fees charged or required for such permits must be paid by the Contractor.

These costs will be included in the bid item provided. If no bid item is included, costs will be included in the various items of work, and no additional payment will be allowed.

38. CLEANUP AND DUST CONTROL

On any construction project requiring trenching within public streets and for which total trenching is in excess of 500 feet, the Contractor will be required to sweep the worksite utilizing a pick-up type of street sweeper a minimum of once daily.

39. WATERING

Water for dust control caused by Contractor’s operations or the passage of traffic through the work will be applied as necessary or as directed by the Public Works Director. Water for the above or other purposes may be obtained from any approved source. If the Contractor chooses to use a City fire hydrant, Contractor must contact the appropriate water purveyor to pay deposits and fees. Costs of water to be used will be included in the cost of various bid items.

40. WATER POLLUTION CONTROL

The following requirements are added to establish storm water and urban runoff pollution prevention controls.

Storm or construction generated water containing sediment such as, construction waste, soil, slurry from concrete/asphalt concrete saw cutting operations, clean-up of concrete transit mixers or other pollutants from construction sites and parking areas will be retained or controlled on site and will not be permitted to enter the storm drain system.

Temporary sediment filtering systems such as sandbags, silt fences, or gravel berms will be utilized to trap sediment so that only filtered water enters the City’s storm drain system. Proper clean up and disposal of settled sediment and the filtering system will be the responsibility of the Contractor.

Discharge of concrete transit mixer wash water on to approved dirt areas (sub-grade area designated for new concrete construction for example) is acceptable. Discharge on to private property, parkway areas, or the street is not permitted.

Plastic or other impervious covering will be installed where appropriate to prevent erosion of an otherwise unprotected area, along with any other runoff control devices deemed appropriate by the City.

Excavated soil stored on the site will be covered in a manner that minimizes the amount of sediments running into the storm drain system, street or adjoining properties.

-63-

Standard Specifications
Specifications No. 21/22-02
SS-24

No washing of construction or other industrial vehicles and equipment will be allowed adjacent to a construction site. During the rainy season (October 15 to April 15), Contractor will keep at the construction site sufficient materials and labor to install temporary sediment filtering systems and other water pollution prevention control measures. These control measures will be in place and maintained by the Contractor on a daily basis on days when construction is not in progress due to rain.

All costs associated with water pollution control will be borne by the Contractor. Any expense incurred by the City to expeditiously respond to storm drain contamination resulting from Contractor’s failure to implement water pollution control measures will be charged to the Contractor.

41. PROTECTION AND RESTORATION OF EXISTING

IMPROVEMENTS

Where existing traffic striping, pavement markings, and curb markings are damaged or their reflectively reduced by the Contractor’s operations, such striping or markings will also be considered as existing improvements and the Contractor will replace such improvements.

Relocations, repairs, replacements, or re-establishments will be at least equal to the existing improvements and will match such improvements in finish and dimensions unless otherwise specified.

42. PUBLIC CONVENIENCE AND SAFETY

Unless otherwise specified all traffic control will be performed in accordance with the California Manual on Uniform Traffic Control Devices (CA MUTCD), Latest Edition.

Building News, 3055 Overland Avenue, Los Angeles, CA 90034, telephone 310-474- 7771.

43. TRAFFIC AND ACCESS

The Contractor will notify the occupants of all affected properties at least 48 hours before any temporary obstruction of access. Vehicular access to property line will be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Public Works Director.

At least one, 12 foot wide, traffic lane will be provided for each direction of travel on all streets at all times except as permitted by the Public Works Director. The traffic lanes will be maintained on pavement and will remain unobstructed. All work requiring that a lane be closed, or a lane moved right or left will be noticed to the traveling public by use of City approved lighted arrow boards.

Clearances from traffic lanes will be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

-64-

Standard Specifications
Specifications No. 21/22-02
SS-25

One four-foot-wide paved pedestrian walkway will be maintained in the parkway area on each side of all streets. The clearance from the pedestrian walkway to any traffic lane will be five feet. Pedestrians and vehicles will be protected from all excavations, material storage, and/or obstructions by the placement of an adequate number of lighted barricades (minimum two) at each location, one at each end of the obstruction or excavation), which will have flashing lights during darkness. Barricades will be Type I or Type II and lights will be Type A per the CA MUTCD.

44. STREET CLOSURES, DETOURS, BARRICADES

Street closures will not be allowed except as specifically permitted by the Public Works Director.

The Contractor will prepare any traffic control or detour plans that may be required as directed by the Public Works Director. Lane transitions will not be sharper than a taper of 30 to one.

Temporary traffic channelization will be accomplished with barricades or delineators.

Temporary striping will not be allowed unless specifically permitted by the Public Works Director. The Contractor will prepare any plans that may be required for temporary striping to the satisfaction of the Public Works Director. In no event will temporary striping be allowed on finish pavement surfaces, which are to remain.

Where access to driveway or street crossings need to be maintained, minimum 1 1/4- inch-thick steel plating will be used to bridge the trench. All steel plating will have temporary asphalt concrete 1:12 minimum sloped ramps to assist vehicles to cross comfortably over the plates and have a non-skid surface. Plates subject to vehicle high traffic speeds and in residential areas will be secured by welding at the discretion of the Public Works Director.

45. PROTECTION OF THE PUBLIC

It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor will use foresight and will take such steps and precautions as his operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public service, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the Project which will require that immediate and unusual provisions be made to protect the public from danger or loss of life, or damage to life and property, due directly or indirectly to prosecution of work under this contract.

Whenever, in the opinion of the Public Works Director, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Public Works Director, immediate action will be considered necessary in order to protect the public or property due to the Contractor’s operations under this contract, the Public Works -65-

Standard Specifications
Specifications No. 21/22-02
SS-26

Director will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation immediately, the Public Works Director may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Public Works Director, may seem reasonable and necessary.

The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, will be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. Such remedial measures by the City will not relieve the Contractor from full responsibility for public safety.

46. HAZARDOUS MATERIAL

For any excavation, which extends more than four feet below existing grade, the Contractor will promptly, and before the conditions are disturbed, notify the Public Works Director, in writing, of 1) any material that the Contractor believes may be hazardous waste, as defined in Health and Safety Code § 25117, which is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law, 2) subsurface or latent physical conditions at the site differing from those indicated, or 3) unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents.

After receiving notice from the Contractor, the Public Works Director will promptly investigate any condition identified by the Contractor as being hazardous. The rights and obligations of the City and the Contractor with regard to such conditions (including, without limitation, the procedures for procuring change orders and filing claims) will be specified by the provisions of these Standard Specifications regarding Changed Conditions.

If a dispute arises between the City and the Contractor whether the conditions materially differ, involve hazardous waste, or cause a change in the Contractor’s cost or time required for performance of the work, the Contractor will not be excused from any scheduled completion date provided for by the contract, but will proceed with all work to be performed under the contract.

If the Public Works Director determines that material called to the Public Works Director’s attention by the Contractor is hazardous waste, or if the Public Works Director otherwise discovers the existence of hazardous waste, the Contractor will be responsible for removal and disposal of the hazardous waste by qualified personnel and appropriate equipment in the manner required by law as directed by the Public Works Director.

47. LUMP SUM WORK

Items for which quantities are indicated as “Lump Sum,” “L.S.,” or “Job” will be paid for at the price indicated in the Proposal. Such payment will be full compensation for all -66-

Standard Specifications
Specifications No. 21/22-02
SS-27

costs for labor, equipment, materials and plant necessary to furnish, construct and install the lump sum item of work, complete, in place, and for all necessary appurtenant work, including, but not limited to, all necessary cutting, patching, repair and modification of existing facilities, and clean-up of site.

Contractor will furnish three copies of a detailed schedule, which breaks down the lump sum work into its component parts and cost for each part, in a form and sufficiently detailed as to satisfy Public Works Director that it correctly represents a reasonable apportionment of the lump sum. This schedule is subject to approval by Public Works Director as to both the components into which the lump sum item is broken down, and the proportion of cost attributable to each component.

This schedule will be the basis for progress payments for the lump sum work.

48. PARTIAL AND FINAL PAYMENTS

The closure date for the purpose of making partial progress payments will be the last working day of each month. The Contractor will prepare the partial payment invoice with measurement of the work performed through the closure date and submit it to City for approval.

When work is complete, the Contractor will determine the final quantities of the work performed and prepare the final progress payment and submit it to the Public Works Director for approval.

It will take a minimum of 35 calendar days from the date of approving the Contractor’s invoice to make the payment to the Contractor. However, payments will be withheld pending receipt of any outstanding reports required by the contract documents, or legal release of filed Stop Payment Notices against the Contractor. In addition, the final progress payment will not be released until the Contractor returns the control set of Plans and Specifications showing the as-built conditions.

The full five percent (5%) retention will be deducted from all progress payments. The Contractor will make a payment request for the retained amount, for approval by the City, upon field acceptance of the work by the City Public Works Director. The City Public Works Director upon field acceptance and receipt of the final as-built plans and any other reports or documents required to be provided by the Contractor will process a recommendation to the City for acceptance of the work. Not less than 35 calendar days from the City acceptance of the work, the Contractor’s final payment will be made provided Stop Payment Notices or other claims have not been filed against the Contractor and/or the City by material suppliers, sub- contractors, other governmental agencies, and private property owners. Until these Stop Payment Notices are released, and claims are resolved the stop payment/claim amount will be withheld from the final payment.

The Contractor, however, may receive interest on the retention for the length of construction, or receive the retention itself as long as the retention is substituted with escrow holder surety or equal value.
-67-

Standard Specifications
Specifications No. 21/22-02
SS-28

At the request and expense of the Contractor, surety equivalent to the retention may be deposited with the State Treasurer, or a State or Federally chartered bank, as the escrow agent, who will pay such surety to the Contractor upon satisfactory completion of the contract.

Pursuant to PCC § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account.

The Contractor is notified, pursuant to PCC § 22300, that any such election will be at the Contractor’s own expense and will include costs incurred by the City to accommodate the Contractor’s request.

Progress payment paid by the City as contemplated herein, will be contingent upon the Contractor submitting, in addition to any additional documents, an updated Contract Schedule in the form prescribed by these Contract Documents. Failure of the Contractor to submit an acceptable updated Contract Schedule will result in the City withholding partial payment, without liability to the City, until such an acceptable updated Contract Schedule is submitted. Nothing herein will allow the Contractor to suspend or slow progress of the Work.

A City Council resolution established a Project Payment Account, encumbered money in the current budget, and assigned that money to the Project Payment Account which is the sole source of funds available for payment of the Contract Sum. Contractor understands and agrees that Contractor will be paid only from this special fund and if for any reason this fund is not sufficient to pay Contractor, Contractor will not be entitled to payment. The availability of money in this fund, and City’s ability to draw from this fund, are conditions precedent to City’s obligation to make payments to Contractor.

49. DELIVERED MATERIALS

Materials and equipment delivered or stored, but not incorporated into the work, will not be approved for progress payments.

50. TERMINATION OF AGENCY LIABILITY

Before receiving final payment, the Contractor will execute a “Release on Contract” form which will operate as, and will be a release to the City, the City Council, and each member of the City Council and their agencies, from all claims and liability to the Contractor for anything done or furnished for, or relating to, the work or for any act of neglect of the City of any person relating to or affecting the work, except the claim against the City for the remainder, if any there be, of the amounts kept or retained as in these Standard Specifications and except for any unsettled claims listed on said form which have been filed in compliance with the requirements for making claims.

- END OF SECTION -

-68-

Standard Specifications Specifications No. 21/22-02 SS-29 -69-

PCC 9204
Specifications No. 21/22-02
PCC-1

-70-

PCC 9204
Specifications No. 21/22-02
PCC-2

-71-

PCC 9204
Specifications No. 21/22-02
PCC-3

-72-

PCC 9204
Specifications No. 21/22-02
PCC-4

-73-

Technical Provisions
Specifications No. 21/22-02

CITY OF BELLFLOWER

TECHNICAL PROVISIONS

FOR THE

TRAFFIC SIGNAL MODIFICATION ON

BELLFLOWER BOULEVARD AT PARK STREET
SPECIFICATION NO. 21/22-02

SECTION 1 - GENERAL

1.01 LOCATION OF WORK

The project site is at the following intersection:

• Intersection of Bellflower Boulevard and Park Street,

in the City of Bellflower, County of Los Angeles, State of California.

1.02 PRECONSTRUCTION CONFERENCE

A Preconstruction conference shall be conducted at the Bellflower City Hall, 16600 Civic Center Drive, Bellflower, California, 90706, prior to the start of construction. The job- site foreman or superintendent assigned by the CONTRACTOR for this project shall be present at the Preconstruction Meeting. The CONTRACTOR shall prepare a tentative progress schedule for submission and review at the Preconstruction Meeting. The discussion shall include: verification of equipment orders; project supervision; on-site inspection; progress schedules and reports; payments to CONTRACTOR; safety; and other anticipated issues pertinent to the project. CITY will issue Notice to Proceed and City Encroachment Permit at the Preconstruction Meeting.

At this conference, the CONTRACTOR shall designate, in writing, a representative who shall have complete authority to act for the CONTRACTOR. An alternate representative may be designated. The representative or alternate shall be present at the job site whenever work is in progress or whenever actions of the elements necessitate its presence to take measures necessary to protect the project, persons, or property. Any order or communication given to this representative shall be deemed delivered to the CONTRACTOR.

In the absence of the CONTRACTOR or its designated representative, necessary or desirable directions or instructions may be given by the CITY ENGINEER to the superintendent or person having charge of the specific work to which the order applies.

Such order shall be complied with promptly and referred to the CONTRACTOR or its representative.
-74-

Technical Provisions
Specifications No. 21/22-02

1.03 STORAGE

Materials and equipment shall be so stored as to not create a public nuisance and to ensure the preservation of their quality and fitness for the work. No materials or equipment shall be stored at the project sites or in the public right-of-way.

1.04 APPLICABLE STANDARD SPECIFICATIONS

The work to be done under this Contract requires the completion of all work in accordance with the General Specifications and the Technical Provisions herein, and the following Standard Specifications and Standard Drawings, as modified herein. In the case of conflict between the Standard Specifications and Standard Drawings and the Technical Provisions and Construction Drawings, the Technical Provisions and Construction Drawings shall take precedence over all of the following referenced Standard Specifications and Standard Drawings, in all areas. Said referenced Standard Specifications and Standard Drawings shall take precedence in the following order:

1) "Standard Drawings" City of Bellflower, Department of Public Works, latest edition. Said City "Standard Drawings" are incorporated herein by this reference.

2) "Standard Specifications for Public Works Construction", (Green Book), latest edition, including all revisions, addendums and supplements.

Said "Standard Specifications" are incorporated herein by this reference.

Copies may be purchased from Building News, Inc. 3055 Overland Avenue, Los Angeles, California 90034.

3) State of California, Department of Transportation (CALTRANS), Standard Specifications and Standard Plans, 2015 Non-Revised edition.

Said "State Standard Specifications” and “State Standard Plans" are incorporated herein by this reference.

4) “State of California Manual on Uniform Traffic Control Devices” (California MUTCD), latest edition, is incorporated herein by this reference.

SECTION 2 - WORK DETAILS

2.01 DESCRIPTION OF WORK

The work to be done generally consists of furnishing all labor, materials, necessary tools, equipment, supervision, and all utility and transportation services required for the traffic signal upgrade modification at the intersection of Bellflower Boulevard and Park Street, and corresponding signing and striping improvements in accordance with the Plans, Drawings, Specifications and other provisions of the Contract.

-75-

Technical Provisions
Specifications No. 21/22-02

2.02 TRAFFIC CONTROL

1. The compensation for furnishing, placing, maintaining and removing traffic cones, telescoping tree flags, advance warning signs, flagmen, barricades, temporary striping and other safety devices, as required for public safety or as directed by the CITY ENGINEER, shall be considered as included in the Mobilization and Traffic Control Bid Items, or included in the lump sum price paid for various contract items of work, and no additional compensation will be made therefore.

2. The CONTRACTOR shall furnish a detailed traffic control plan, prepared and signed/stamped by a registered Traffic Engineer in the State of California, for CITY and State approval. A minimum of one paved lane of traffic in each direction shall be maintained at all times. No reduction of the traveled way width shall be permitted before 8:30 a.m. or after 3:30 p.m., unless prior approval in writing is obtained from the CITY ENGINEER. Detours shall be in accordance with State Standard Plans and the latest edition of the “California MUTCD, Part 6: Temporary Traffic Control”. The CONTRACTOR shall submit detailed drawings of any proposed detour(s) to the CITY ENGINEER for approval.

3. All traffic lanes and detours shall be continually maintained to prevent the development of potholes and provide smooth, dust-free and mud-free traffic. The CONTRACTOR shall abate dust nuisance on traffic lanes, detours and work sites by cleaning, sweeping and sprinkling with water, or other means, as necessary, during and after the construction hours, including such non-working days as Saturdays, Sundays and holidays.

4. All roadway signs, delineators, channelizers, cones and barricades shall be in “like new” condition. All roadway signs used for night-time traffic control shall have retro-reflective sheeting that meet or exceed ASTM Standard D 4956 Type III (3M Co. High Intensity Grade or approved equal).

5. Contractor shall furnish, provide, and maintain four (4) Changeable Message Signs (CMS) to be used along Bellflower Boulevard prior to and throughout the duration of the project. The primary message shall state “Bellflower Blvd Construction Expect Delays”, or as indicated by CITY ENGINEER.

2.03 ORDER OF WORK

1. Order equipment and provide CITY ENGINEER written confirmation of equipment orders from vendors. See Sections 3.1.1 and 3.1.2.

-76-

Technical Provisions
Specifications No. 21/22-02

2. The CONTRACTOR shall notify local authorities and utility companies of his intent to begin work at least two (2) days before work is begun. The CONTRACTOR shall cooperate with local authorities in handling traffic through the work area.

2.04 DUST CONTROL

1. The CONTRACTOR shall comply with Section 7-8.1, "Cleanup and Dust Control," of the Standard Specifications. The CONTRACTOR must comply with the CITY OF BELLFLOWER’S MUNICIPAL CODE. Dust generated by traffic, CONTRACTOR’S operations, or wind are all included in the definitions of "dust".

2. The CONTRACTOR will be responsible for watering the work area where dust is generated from public traffic, CONTRACTOR’S operations, and wind. CONTRACTOR’S area of operations includes areas outside of the roadbed limits where excavation, fill, or stockpiling of dirt or debris has taken place. The CONTRACTOR is responsible for monitoring all of the above-described areas in the project area during the life of the project, including holidays and weekends.

3. Payment for maintaining dust control within the project area shall be considered as included in the lump sum price paid for the Traffic Signal Modification bid item, and Signing and Striping bid item, and no additional compensation will be made therefore.

2.05 CONSTRUCTION SCHEDULE

1. The CONTRACTOR shall prepare a construction schedule for this contract in conformance with the Provisions in Section 6-1, "Construction Schedule and Commencement of Work," of the Standard Specifications.

2. The CONTRACTOR shall be responsible for establishing a Critical Path method construction schedule for removal of existing signing and striping, and traffic signal pole equipment, and installation of the new traffic signal equipment within the limits as shown on the Plan(s). This schedule will be subject to review and approval by the CITY ENGINEER before any of these processes begin. Where areas of additional removal are found to be needed during the course of this work, the CITY ENGINEER may provide for such work to be performed by other forces or direct that it may be performed by the CONTRACTOR as a change in the work. -77-

Technical Provisions
Specifications No. 21/22-02

2.06 WATER

1. The CONTRACTOR shall make arrangements with the BELLFLOWER- SOMERSET MUTUAL WATER COMPANY to obtain water from
designated fire hydrants at or near the project for use in dust control and soil compaction. It shall be the responsibility of the CONTRACTOR to pay for the water and any deposits required.

2. The cost to furnish and apply water shall be considered as included in the lump sum price paid for the Traffic Signal Modification bid item, and Signing and Striping bid item, and no additional compensation will be made therefore.

2.07 DRAWING & SPECIFICATIONS; (AS-BUILT DRAWINGS)

1. The CONTRACTOR shall maintain on the job sites, a set of full-size blueline or blackline prints, to which the CITY ENGINEER or his/her representative shall have access at all times.

2. The Plans, Specifications, and other Contract Documents will govern the project. The Contract Documents are intended to be complementary and cooperative and to describe and provide for a complete project. Anything in the Specifications and not on the Plans, or on the Plans and not in the Specifications, shall be as though shown or mentioned in both.

3. While it is believed that much of the project will be shown on the Plans or indicated in the Specifications, this does not warrant the completeness or accuracy of such information. The CONTRACTOR shall ascertain the existence of any conditions affecting the cost of the project which would have been disclosed by a reasonable examination of the sites.

4. On these Plans the CONTRACTOR shall mark all as-built conditions, locations, configurations, and other details that may vary from the details represented on the original drawings. This master record of as-built conditions, including all revisions made necessary by Addenda, Change Orders, and the like, shall be maintained up to date during the progress of the work.

5. In the case of those drawings that are superseded by final shop drawings, the as-built drawings shall be updated by indicating how those portions are superseded.

6. Upon completion of the work and prior to final acceptance, legible, as-built drawings shall be turned over to the CITY ENGINEER.
-78-

Technical Provisions
Specifications No. 21/22-02

2.08 STORM WATER POLLUTION PREVENTION PLAN

The CONTRACTOR shall implement proper Best Management Practices (BMPs) throughout construction to comply with all applicable NPDES requirements.

2.09 CLEANUP AND RESTORATION OF SURFACES

1. The CONTRACTOR shall, as directed by the CITY ENGINEER, remove from all public and private property at its own expense all temporary structures, rubbish and waste materials resulting from its operations. This includes temporary work area obtained by the CONTRACTOR.

2. All existing surfaces, whether asphaltic or concrete, Portland Cement concrete, permanent fencing and barriers, landscape material such as turf, trees, shrubs, gravel, etc., or other, shall, after construction, be restored to a condition at least equal to that which existed prior to construction. All restoration shall be in-kind except in those areas where details indicate to the contrary. The details of those areas will govern.

3. Restoration shall include, but not be limited to, the replacement of landscape planting and irrigation system, and pavement striping which are disturbed by the CONTRACTOR’S operations in the course of work.

4. Payment for this work shall be considered as included in the lump sum price paid for the Traffic Signal Modification bid item, and Signing and Striping bid item, and no additional compensation will be made therefore.

2.10 SPECIFICATIONS AND DRAWINGS FURNISHED TO CONTRACTOR

The CITY will furnish to the CONTRACTOR four (4) sets of approved project Specifications, and four (4) sets of full-scale Drawings. Additional quantities of Specifications and Drawings will be furnished at reproduction cost. -79-

Technical Provisions
Specifications No. 21/22-02

2.11 PERMITS AND LICENSES

1. Permits: In lieu of Section 7-5, "Permits", of the Standard Specifications, the CONTRACTOR shall obtain permits for all work within the CITY, County and State public right-of-way, and the project area and will maintain proper safety and regulatory signs for such work. The CITY will waive the CITY’S permit fee.

2. Licenses: The CONTRACTOR shall obtain and pay all costs incurred for licenses necessitated by his operations. Prior to starting any work, the CONTRACTOR and all sub-contractors, shall be required to have a City of Bellflower Business License valid for the time they are engaged in work.

3. Fees: The CONTRACTOR shall be responsible for all inspection fees required by agencies other than the CITY OF BELLFLOWER
necessitated by his operations for this project. This includes fees required for inspection work within the right-of-way of these other agencies and other public right-of-way. The cost of these fees shall be considered as included in the lump sum price paid for the Traffic Signal Modification bid item, and Signing and Striping bid item, and no additional compensation will be made therefore.

2.12 SURPLUS MATERIALS

1. All excavated material not suitable for stockpiling that contains debris, shrubbery, asphaltic concrete, Portland Cement concrete or other deleterious material shall become the property of the CONTRACTOR.

2. Material shall be disposed of at a legally acceptable disposal site furnished by the CONTRACTOR and shall be considered as included in the lump sum price paid for the applicable Traffic Signal Modification bid item, and Signing and Striping bid item, and no additional compensation will be made therefore.

2.13 AIR CONTAMINANTS

The CONTRACTOR shall not discharge smoke, dust, or any other air contaminants into the atmosphere in such quantity as will violate the regulations of any legally constituted authority.
-80-

Technical Provisions
Specifications No. 21/22-02

2.14 EXISTING FACILITIES

1. DESCRIPTION. This section covers the protection and preservation of existing facilities within or adjacent to the right-of-way and other construction areas, their installation, reconstruction, relocation or replacement and their demolition and removal, as specified, shown or required.

2. TYPES. Known facilities consist of existing roads, sidewalk, landscaping, irrigation, walls, signs, ditches and associated structures, water appurtenances and telephone lines, buried communications cable, buried water pipe, buried gas pipes, buried sewer pipe, walls, fences and gates.

To the extent possible, the locations of such facilities are shown. Facilities other than those shown may exist, and CONTRACTOR shall at all times exercise care to avoid physical damage to or disruption in the service of existing facilities. Existing improvements visible at the job sites, for which no specific disposition is made on the Plans, but which could reasonably be assumed to interfere with the satisfactory completion of the improvements contemplated by the Plans, shall be removed and disposed of by the CONTRACTOR. Where underground main distribution conduits such as water, gas, sewer, electric, telephone or cable television are shown on the Plans, the CONTRACTOR, for the purpose of preparing a bid, shall assume that every adjacent property will be served by a service connection for each type of utility. Damage caused by CONTRACTOR’S operations to facilities that are shown or otherwise indicated to CONTRACTOR by CITY ENGINEER shall be repaired or replaced by and at the expense of CONTRACTOR. When existing sidewalk is removed, entire panels shall be removed and replaced. No new joints will be allowed.

3. PROTECTION OF EXISTING FACILITIES. Before commencement and during the course of the work, CONTRACTOR shall cooperate with CITY ENGINEER and local authorities in making all reasonable efforts to determine the exact locations of facilities, which may be encountered during the course of the work. Facilities that are to remain in place, those that are to be salvaged and those that are to be repaired or reconstructed in locations outside the rights-of-way shall be protected to avoid damage.

Damage caused to such facilities due to CONTRACTOR’S negligence shall be repaired by and at the expense of the CONTRACTOR.

CONTRACTOR shall determine the location and depth of all utilities, including service connections, which have been marked by the respective owners, and which may affect or be affected by its operations. Full compensation for such work shall be considered as included in the lump sum price paid for the Traffic Signal Modification bid item, and Signing and Striping bid item, and no additional compensation will be made therefore.

-81-

Technical Provisions
Specifications No. 21/22-02

CONTRACTOR shall contact Underground Service Alert at 1-800-227- 2600 and shall possess a valid "USA Ticket" throughout the course of construction operations.

If during the course of excavation CONTRACTOR encounters underground facilities whose presence was not previously known or shown on the Plans, the CONTRACTOR shall immediately notify CITY ENGINEER of the location and take steps to prevent damage to the facilities. In the event that damage has already occurred, measures shall be taken to prevent further damage, and to prevent the development of dangerous conditions.

When buried facilities, whose presence were not previously known, are encountered during the course of the work, and it is determined that such facilities must be moved, relocated or replaced, CITY ENGINEER may provide for such work to be performed by other forces, or direct that it may be performed by the CONTRACTOR as a change in the work.

4. PEDESTRIAN SAFETY. Safe pedestrian access shall be maintained through the job sites at all times.

2.15 CONSTRUCTION LIMITS

Construction shall be confined to those areas shown on the Plans, or as directed by the CITY ENGINEER.
-82-

Technical Provisions
Specifications No. 21/22-02

SECTION 3 - CONSTRUCTION DETAILS

3.1 TRAFFIC SIGNAL MODIFICATION IMPROVEMENTS.

The work to be done consists of the modification of an existing traffic signal, including temporary traffic signals/wiring (see Section 3.1.7), and related traffic signing and striping; and performing all operations; furnishing all materials, equipment, and traffic control; and all necessary appurtenant work for the improvements at the following location:

THE INTERSECTION OF:

BELLFLOWER BOULEVARD AND PARK STREET

References in the Technical Provisions to "State Standard Specifications" shall mean the 2015 Non-Revised Standard Specifications, of the State of California, Department of Transportation. References in the Technical Provisions to "State Standard Plans" shall mean the 2015 Non-Revised Standard Plans of the State of California, Department of Transportation, and where applicable, other standard plans noted herein or noted on the plans. Copies of these State specifications and standard plans may be obtained from:

State of California - Department of Transportation
Central Publication Distribution Unit
1900 Royal Oaks Drive
Sacramento, California 95819

Electronic file copies of these specifications and standard plans may be obtained from the CALTRANS website.

The furnishing and installing of traffic signals and safety lighting shall conform to the provisions of Section 86, "Electrical Work" and Section 87 “Electrical Systems” of the 2015 Non-Revised Standard Specifications of the State of California, Department of Transportation, and these Technical Provisions.

3.1.1 EQUIPMENT LIST AND DRAWINGS.

Equipment list and drawings of electrical equipment and material shall conform to the provisions in Section 86-1.01C(1), "Submittals - General", of the State Standard Specifications, and these Technical Provisions.

Add the following:

All equipment and hardware supplied by the CONTRACTOR shall be approved by the CITY ENGINEER prior to purchase. Submittals shall be on hand for the pre-construction meeting.

-83-

Technical Provisions
Specifications No. 21/22-02

The CONTRACTOR is required to submit to the CITY ENGINEER "as-built" prints, prior to the CITY'S accepting the improvements. The prints shall indicate in red all deviations from the contract Plans such as location of poles, pull boxes and runs, depths of conduit, number of conductors, and other appurtenant work for future references.

3.1.2 ORDER OF WORK (SUBMITTALS).

Order of work shall conform to the provisions in 86-1.01C(1), "Submittals - General", of the State Standard Specifications and these Technical Provisions.

Add the following:

Tentative project schedule shall be submitted to the Engineer within ten (10) working days after the date of the Notice of Award of Contract and/or prior to pre-work conference meeting. The schedule shall be supported by a written fully-detailed sales order acknowledgement from each supplier of materials or equipment indicating that all orders have been placed and acknowledged and setting forth the dates that each item will be delivered. Submitted sales order acknowledgements shall be approved by the CITY or its representative and shall be the only material or equipment used on this contract. The CONTRACTOR shall furnish the CITY ENGINEER with a statement from the vendor that the order for said Contractor-provided equipment has been received and accepted by the vendor.

It is important to note, for Type 15 and larger traffic signal poles shown on the Plan, potholing has already been conducted by the CITY during design.

CONTRACTOR shall review/define exact location of all utilities in the vicinity of the proposed new foundations prior to excavation. The exact locations of all foundations for new signal, safety lighting, and electrical system equipment shall be approved by the ENGINEER and/or his field representative prior to the start of any excavation work and CONTRACTOR shall adjust his work as directed. Foundations shall be hand-dug until clear of obstructions.

The first order of work for CONTRACTOR shall be to perform all potholing of the traffic signal control equipment, including full potholing of the signal pole foundations. The CONTRACTOR may perform sub-surface work consisting of the installation of conduit, foundations, and detectors, prior to receipt of all electrical materials and equipment.

Above ground work shall not commence until such time that the CONTRACTOR notifies the CITY ENGINEER in writing of the date that all electrical materials and equipment are received, and said work shall start within (15) days after the said date. No materials or equipment shall be stored at the job site until receipt of said notification by the CITY ENGINEER. The job site shall be maintained in neat and orderly condition at all times.

All salvaged equipment shall become property of the CONTRACTOR, unless otherwise indicated on the Plan, and will be removed and disposed of by CONTRACTOR. The CONTRACTOR shall be responsible for transporting all signal equipment hardware to/from the job site.
-84-

Technical Provisions
Specifications No. 21/22-02

3.1.3 FOUNDATIONS.

Foundations shall conform to the provisions in Section 87-1.03E(3) “Concrete Pads, Foundations, and Pedestals", of the State Standard Specifications and these Technical Provisions.

Add the following:

It is important to note, for Type 15 and larger traffic signal poles shown on the Plan, foundation potholing has already been conducted by the CITY during design. As indicated on Plans, the existing traffic signal pole foundations are to be completely removed before installation of the new traffic signal pole equipment. Temporary wiring shall be installed prior to equipment removal to keep traffic signal operating during construction (see Section 3.1.7). It is noted, the foundations for the new traffic signal equipment shall be in conformance with Caltrans 2015 ‘Non-Revised’ Standard Plans and Specifications.

All new foundation concrete shall be vibrated when poured to eliminate air pockets.

Flyash substitutes and/or admixtures shall not be permitted. A 28" traffic cone with reflective sleeve shall be bolted to all exposed anchor bolts during the period between installation of the foundation and installation of the standard or cabinet. A plywood or aluminum adapter may be used to secure the traffic cone to the anchor bolts.

Costs to remove old foundations and install new foundations for posts and standards as indicated on the Plans shall be included in the lump sum price paid for the applicable Equipment Removal Plan or Traffic Signal Modification bid items, and no additional compensation shall be allowed therefor.

3.1.4 STANDARDS, POLES, STEEL PEDESTALS, AND POSTS.

Standards, steel pedestals and posts shall conform to the provisions in Section 86-

1.02J, "Standards, Poles, Pedestals, and Posts" and Section 87-1.03J, "Standards, Poles, Pedestals, and Posts", of the State Standard Specifications, State Standard Plans, and these Technical Provisions.

Add the following:

CONTRACTOR shall remove and salvage all existing traffic signal pole equipment. Temporary wiring shall be installed prior to equipment removal to keep the traffic signal in operation during construction (see Section 3.1.7). New traffic signal poles, signal and luminaire arms, and anchor bolts shown on Plan shall be CONTRACTOR furnished and installed. The new traffic signal pole/arm equipment shall be ornamental black in color to match the existing ornamental traffic signal equipment at other adjacent traffic signals along Bellflower Boulevard. It is important to note, the decorative traffic signal equipment shall be in conformance with 2015 ‘Non-Revised’ Standard Plans and Specifications. -85-

Technical Provisions
Specifications No. 21/22-02

CITY OF BELLFLOWER

DECORATIVE FLUTED TRAFFIC SIGNAL POLE SPECIFICATIONS

GENERAL

These specifications describe the materials required to complete the traffic signal and electrical system installation as shown on the Plans and/or engineered drawings. They may be modified or deleted by notes on the Plans or drawings. Notify the Project Engineer of any conflicts for clarification.

ACCEPTANCE

The CITY OF BELLFLOWER has reviewed prospective products to be used for decorative traffic signals at intersections along Bellflower Boulevard. These products have been engineered and are detailed in the Plans and/or drawings. All components shall match existing decorative traffic intersections throughout the CITY OF BELLFLOWER.

The decorative traffic signal pole assemblies called out on Plans are engineered by South Coast Lighting & Design and are approved by the CITY OF BELLFLOWER. The approved pole part numbers are:

• BCSTE1827_1A-10
• BCSTE2542_17-3-100_20-12
• BCSTE3142_19-4-100_25(30)-15

See attached approved drawings.

To establish fair bidding practices, the CITY OF BELLFLOWER will review products for pre-approval. Pre-approval must be completed 30 days prior to bid opening. Products that are not pre-approved will NOT be accepted.

Pre-approval requirements include, but are not limited to:

- Furnish complete submittal packages for all products including specification, certifications, drawings and photometric analysis (for LED fixtures). - Provide a list of locations in Southern California where these products are currently installed, including agency contact information. - Company Profile with years in business and how long they have been manufacturing specified products. Include local office, factory and/or warehouse information.
- Casting samples to be furnished to the CITY OF BELLFLOWER for review. -86-

Technical Provisions
Specifications No. 21/22-02

- LED fixture samples to be furnished to the CITY OF BELLFLOWER for evaluation and testing.
- Finish certification and samples to be provided to the CITY OF BELLFLOWER; shall meet finish specification.
- Photometric layout shall meet Caltrans requirements for intersections. ITL reports for photometric analysis suggested, and may be required. - LED fixture LM79.
- Buy America Certification.
- Certification of UL Approval for wet locations.
- IP66 weatherproof rating of LED fixture.
- All welds to conform to AWS-D1.1.
- Pole structural welds shall be by a certified welder. - Furnish banner arm detail with no strapping.

CITY OF BELLFLOWER Engineering staff shall have a minimum of fourteen (14) business days to complete the review and evaluation of submittals, including samples.

MATERIAL SPECIFICATIONS

GENERAL POLE REQUIREMENTS & DESIGN CRITERIA

CITY OF BELLFLOWER Decorative Traffic Signal Poles shall be tapered, fluted and designed to meet 100 mph wind loading. Current Caltrans design criteria shall be used to determine pole diameter, gauge of base plate, and anchor bolt sizing, unless otherwise noted in Specifications and/or Plans.

DECORATIVE TRAFFIC SIGNAL POLES

Decorative traffic signal poles shall be sourced from a CALTRANS-APPROVED POLE MANUFACTURER. Pole taper shall be .14” per foot. A reinforced handhole shall be built into pole structure. Structural calculations signed by a California civil or structural engineer shall accompany pole submittals. CITY will receive 2 wet-stamped copies.

Calculations shall include handhole opening. Pole assemblies are to be finished per the paint & finish specifications shown herein below. All poles are to be furnished by the same manufacturer and shall match existing decorative traffic poles along Bellflower Boulevard.

SIGNAL MOUNTING ARMS

Signal mounting arms to be length, style, and size per Plan. Signal arm shall be finished per finish specification herein.
-87-

Technical Provisions
Specifications No. 21/22-02

BASE PLATE

The base plate shall be ASTM A36 steel and welded to the steel pole shaft by a certified welder. Telescopic weld beads on top and bottom of base. The thickness of the base plate is determined by the structural engineer.

ANCHOR BOLTS

Anchor bolts are to be high-strength steel and sized per Caltrans 2010 specification.

DECORATIVE LUMINAIRE ARM WITH SCROLL

Decorative luminaire arm to be mounted via a Caltrans simplex with a clamp-on scroll.

The arm shall be structurally designed to meet wind load requirements. The luminaire arm length shall be per Plan.

DECORATIVE BELLFLOWER BASE

Decorative Bellflower Base shall be cast aluminum and an exact match of existing bases in the CITY OF BELLFLOWER. Casting ingot shall be new and 1st run ASTM- A356 aluminum ingot. Foundry is to be located in Southern California. Minimum wall thickness is to be 0.200”, all welding shall be ground smooth and no detail of base to be ground away, do not use circular grinders on finished product. All casting voids and imperfections shall be filled by heli-arc weld and ground smooth. NO BONDO OR OTHER PLASTIC FILLER WILL BE ACCEPTABLE. The base shall be by South Coast Lighting & Design.

Access openings & 2 doors shall be cast into base; they shall be cast in such a way where they will not be noticeable. Access doors shall be at same height and opening as pole handhole. Base dimensions and sizes shall match existing.

Saw cutting of bases is not permitted.

Access doors are to be interchangeable on all new bases and existing. Top of base shall be designed to have a fit tolerance of 1/8” maximum against pole. Base shall have a positive connection to secure base to pole and prevent it from being lifted or moved.

A sample base will be required for approval by CITY OF BELLFLOWER at least 7 days prior to bid. The CITY will accept or reject the base until it is of a quality they desire, and the city’s decision is final. The approved base will be used as a benchmark for all decorative bases on this project. The bases are to be finished per paint & finish specification. All hardware shall be stainless and designed to be hidden from view. The CITY OF BELLFLOWER logo is to be cast into each base half. Bases shall have Part # listed on the inside of the base.
-88-

Technical Provisions
Specifications No. 21/22-02

HARDWARE

Hardware shall be stainless steel on all pole components.

LUMINAIRE

Luminaire shall be a LED Mission Bell Style fixture approved and used within the CITY OF BELLFLOWER. The fixture shall be manufactured by King Luminaire (Part No.

K825 Mission Bell – LED – see Attachment) and have a Type 3 Lighting Distribution.

Fixture shall have a 10-Year standard warranty shown on the manufacturer’s website, and shall have a die cast aluminum structural housing and tool-less features to replace driver & photocell. Luminaire fixture parts shall be interchangeable with each other.

CONTRACTOR shall supply the same fixture for the entire project. Wattage and voltage shall be detailed on the Plans. The fixture shall carry a UL label “SUITABLE FOR WET LOCATION”, have an IP rating of IP66, and have documented testing for the finish to withstand salt spray for 3,000+ hours. The fixture shall be designed for 100 MPH wind loading. Finish shall be per paint & coating specification. A sample LED fixture may be required for approval 30 days prior to bid date.

FINISH, PAINT & COATINGS

- Steel pole assemblies and all components shall be hot-dipped galvanized to ASTM A123 after complete fabrication. The galvanizing coats all exterior and internal parts and surfaces of steel poles and parts. Prior to painting, the galvanized surfaces are mechanically etched by brush blasting per SSPC SP7.

Parts are washed and heated cured prior to coating.
- Aluminum components and castings shall be chemically etched and water cleaned. Parts shall be forced heat dried prior to coating and finished within 2 hours after cleaning to prevent oxidation.
- All material shall be finished with a 2 part epoxy polyurethane, color per CITY OF BELLFLOWER & per Plans. Paint shall be TNEMEC ENDURA SHIELD SERIES 71, or approved equal. Prior to finish coat, a TNEMEC primer shall be applied and 2-4 mils DFT shall be achieved. Finish coat shall be TNEMEC Epoxy polyurethane and shall be applied to achieve a 2-4 mils DFT. - Prior to painting, a finished paint chip must be submitted and approved by CITY OF BELLFLOWER.
- All finished components shall be wrapped for maximum protection during shipment and installation. Touch-up paint required with shipment, 1 gallon of finish paint per 25 poles shall be shipped with order. Manufacturer shall furnish paint formula and paint manufacturer to CITY.

-89-

Technical Provisions
Specifications No. 21/22-02

New standards shall be installed with three (3) feet minimum clearance between the pole face and curb face, unless otherwise shown on Plan. CONTRACTOR shall obtain CITY approval for exact equipment locations prior to final placement. Standards shall be set at grade in unpaved areas or at existing or future sidewalk grade level.

New standards shall not be erected or installed until the new concrete foundations have set at least one week and all new conduit, pull boxes, wiring, and other underground installation is complete and in place; and new signal faces, signs, and other materials required to complete the installation in its entirety have been inspected, and are in the CONTRACTOR'S possession and available for immediate installation.

If applicable, CONTRACTOR, at his/her own expense, shall arrange for the filling of any unused “old” or wrong holes left in the pole shafts and signal or luminaire arms, per Caltrans specifications.

The cost of removing the old traffic signal pole assemblies and installing the new decorative (ornamental) traffic signal standards, poles, steel pedestal and posts, including anchor bolts, shall be included in the Lump Sum price paid for the applicable Equipment Removal Plan or Traffic Signal Modification bid items, and no additional compensation shall be allowed therefor.

3.1.5 CONDUIT.

Conduit shall conform to the provisions in Section 86.1.02B, "Conduit and Accessories" and Section 87-1.03B(3), “Conduit Installation Underground”, of the State Standard Specifications, and these Technical Provisions.

Add the following:

It is important to note, certain conduit at the intersection of Bellflower Boulevard and Park Street has already been installed by the CITY during a separate project.

CONTRACTOR shall carefully review the traffic signal plan and verify in the field to determine what conduit has been installed, and what new conduit remains to be installed by the CONTRACTOR.

Boring or drilling methods shall be used for the installation of new conduit, as trenching in pavement method is not allowed.

Rigid metal drill rod to be used as a drilling or jacking rod for new conduit shall be fitted with suitable drill bits for the size as approved by the Engineer. Conduit runs shall be installed continuous in type material form the beginning to the terminating end of the run.

-90-

Technical Provisions
Specifications No. 21/22-02

Conduit shall be installed at a depth of not less than (30) inches below grade or greater than (48) inches below finished grade in all areas, unless otherwise specified on Plan.

Except as otherwise noted, all conduit shall be Type 3 (rigid non-metallic type) conduit -- PVC Schedule 80. All conduit shall be minimum 2" diameter, unless otherwise noted on the Plans. Bell ring type bushings shall be used on all PVC conduits. Non-metallic type conduits, without a grounding conductor, shall have a bare #8 AWG solid copper wire that shall terminate at each pull box and at the ends of conduit runs.

Eighteen (18) inches of the solid copper wire shall be coiled in each pull box. After conductors have been installed, the ends of conduits terminating in pull boxes; the controller cabinet or other terminating facilities shall be sealed with an approved type of sealing compound.

Conduit runs are shown schematically in the desired locations. Field conditions at the time of construction may dictate minor changes to facilitate the CONTRACTOR’S work.

Such minor changes will not constitute extra work. Actual installation shall be done in the most direct manner or as directed by the CITY ENGINEER, and must be shown on the as-builts.

3.1.6 PULL BOXES.

Pull boxes shall conform to the provisions in Section 86-1.02C, “Pull Boxes” of the State Standard Specifications and these Technical Provisions, except as amended herein.

Add the following:

It is important to note, certain pull boxes at the intersection of Bellflower Boulevard and Park Street have already been installed by the CITY during a separate project. CONTRACTOR shall carefully review the traffic signal plan and verify in the field to determine what pull boxes have been installed, and what new pull boxes remain to be installed by the CONTRACTOR.

Pull Boxes shall be placed with their tops flush with surrounding finish grade.

Replace the entire subsection with the following:

Pull boxes, covers and extensions for installation in the ground or in sidewalk areas shall be of the sizes and details shown on the Plans and shall be pre-cast of reinforced Portland Cement Concrete (PCC). Plastic pull boxes shall not be used. All pull boxes shall be Christy Concrete Products, Inc. with Fiberlyte lid, or approved equal.

Pull boxes shall be size No. 6, unless noted otherwise on the construction Plans.

-91-

Technical Provisions
Specifications No. 21/22-02

The amount of pull boxes shown on the Plan is to be installed as a minimum. The CONTRACTOR may, at no additional cost to the CITY, install additional or larger pull boxes to facilitate the CONTRACTOR’S work, with the approval of the ENGINEER.

In unimproved areas, if applicable, install pull box markers and marker posts. Markers shall be Type L.

Pull box installation shall conform to the provisions in Section 87-1.03C(1), "Installation of Pull Boxes - General", of the Caltrans Standard Specifications.

Within the pull box, the conduit shall be placed in a manner such that the lowest portion of the opening shall be a minimum of two (2) inches above the grouted bottom of the pull box, and the upper portion of the opening shall be a minimum of eight (8) inches from the top of the pull box. The conduit shall also be placed in a manner that will allow any cables/wires to be pulled in a straight line and clear the side of the pull box by a minimum of two (2) inches (angle of exit.)

No new or existing pull box shall be located within one (1) foot of any wheelchair ramp.

Subsection 86-1.02C(1), “Pull Boxes - General,” of the State Standard Specifications is supplemented and amended as follows:

Covers for pull boxes shall be marked as follows:

(a) “TRAFFIC SIGNAL”: Where pull box contains traffic signal conductors with or without street lighting conductors. Traffic signal conductors include all field wiring, and loop detector conductors and video coaxial cables.

(b) “TRAFFIC S.I.C.”: Traffic Signal Interconnect copper cable.

(c) “TRAFFIC F.O.”: Traffic Signal Interconnect Fiber Optic or Communications cable.

(d) “STREET LIGHTING”: Where a pull box contains street lighting conductors only. “HIGH VOLTAGE” shall be added where street lighting voltage is above 600 volts.

(e) “TELEPHONE”: Where pull box contains telephone conductors only.

(f) “EDISON”: Where pull box contains Southern California Edison Company conductors.

Pull box lids shall be the type that locks down.

-92-

Technical Provisions
Specifications No. 21/22-02

3.1.7 CONDUCTORS, CABLES, AND WIRING.

Conductors and wiring shall conform to the provisions in Section 86-1.02F(1)(c)(i), "Conductors and Cables - General", and Section 87-1.03F(2)(c)(iii), "Conductors Signal Cables", of the State Standard Specifications, and these Technical Provisions.

Add the following:

TEMPORARY SIGNALS & WIRING:

As temporary wiring is applicable to this project, all temporary wiring installations shall be the responsibility of the CONTRACTOR, and all work, materials and equipment required to keep the existing signal system(s) operational, shall be considered as included in the Temporary Traffic Signal/Wiring bid item, and no additional compensation shall be allowed therefore.

All existing vehicle and pedestrian indications, detectors, and control equipment, shall be maintained and operational, except during scheduled shutdown hours. As shown on Plans, due to the installation of certain new traffic signal mast-arm poles at the existing pole locations, ‘temporary’ mast-arm poles shall be installed to meet the needs of traffic operations and safety. CONTRACTOR shall install ‘temporary’ traffic signal poles with safety lights on concrete blocks, as well as ‘temporary’ wiring. At minimum, the temporary pole footing shall be a plate with anchors on it, stacked with six (6) 5-gallon buckets filled with concrete on top of the plate.

Prior to the installation of the temporary mast-arm poles, CONTRACTOR shall place applicable Sidewalk Closed/No Pedestrian Access signs on barricades.

CONTRACTOR shall provide the CITY with a complete and workable temporary electrical system plan proposed to be utilized during construction and signal changeover (i.e., temporary signals and overhead wiring). Prior to the plan being implemented, the CITY ENGINEER, or his field representative, shall approve said temporary electrical system. The CONTRACTOR will be responsible for all costs associated with the final temporary electrical service plan approved by the CITY ENGINEER.

Installation of temporary facilities or wiring for the convenience of the CONTRACTOR during the progress of the work must also be submitted in writing and approved by the Engineer. The cost of installation and removal of such temporary facilities or wiring shall be at the CONTRACTOR’S expense.

All vehicle and pedestrian indications, detectors, and control equipment, shall be maintained and operational, except during scheduled shutdown hours. The signal system shutdown shall be limited to the period between the hours of 9:00 a.m. and 3:00 p.m., unless otherwise approved by CITY ENGINEER. The CONTRACTOR shall notify CITY ENGINEERING at least (48) hours prior to disconnecting any signal indications.

-93-

Technical Provisions
Specifications No. 21/22-02

When an existing system is being modified, or a temporary system is required, the cost for maintaining the existing or temporary electrical systems work shown or not shown on the Plans or specified in the Technical Provisions, and which is considered by the Engineer as necessary to keep all or any part of the system in effective operation, shall be included in the Temporary Traffic Signal/Wiring bid item, and no additional compensation shall be allowed therefore.

Traffic signal shutdowns shall only be allowed with the approval of the Engineer for signal changeover. CONTRACTOR shall provide traffic control officers as deemed necessary by the Engineer during any traffic signal shutdowns. Full compensation for traffic control officers and temporary wiring installations shall be considered as included in the Temporary Traffic Signal/Wiring bid item, and no additional compensation shall be allowed therefore.

CONDUCTORS/CABLES/WIRING:

The CONTRACTOR shall provide new conductors, unless otherwise shown on the Plan or provided for in these Technical Provisions.

New signal cable shall be installed continuously between terminal box and controller cabinet, no splicing will be allowed. All other conductors shall be THW type. Nylon jacketed conductors shall not be used.

Conductors No. 8 AWG and larger shall be stranded. Plastic conduits containing power circuit conductors shall have a bare No. 8 AWG solid grounding copper conductor that shall terminate at each pull box at the ends of the conduit run. Conductors No. 10 AWG or larger shall be spliced by the use of “C” shaped compression connector, and soldered.

Splices shall be Type C insulated by Method B as shown on State Standard Plan ES- 13A.

3.1.8 SPLICE INSULATION.

For wire, splice insulation shall conform to the provisions in Section 86-1.02H, “Splicing Materials”, Section 87-1.03H, "Conductor and Cable Splices", and Section 87-1.03H(2), "Splice Insulation Methods", of the State Standard Specifications, and these Technical Provisions.

Add the following:

Conductors No. 10 AWG or larger shall be spliced by the use of "C" shaped compression connectors.

Splices shall be insulated by Method "B".

-94-

Technical Provisions
Specifications No. 21/22-02

3.1.9 BONDING AND GROUNDING.

Bonding and grounding shall conform to the provisions in Section 86-1.02F(1)(c)(ii), "Bonding Jumpers and Equipment Grounding Conductors", of the State Standard Specifications, and these Technical Provisions.

Add the following:

Grounding jumper shall be attached by a 3/16 inch or larger brass bolt in the signal standard or controller pedestal and shall be run to the conduit, ground rod or bonding wire in adjacent pull box. Grounding jumper shall be visible after cap has been poured on foundation.

3.1.10 SERVICE CABINET.

Electrical service installation shall conform to the provisions in Section 86-1.02P(2), “Service Equipment Enclosures” of the State Standard Specifications and these Provisions, except as amended herein.

Add the following:

CONTRACTOR shall protect-in-place and re-use the existing Type III electrical service cabinet.

If applicable, electrical service equipment work shall conform to Southern California Edison (SCE) requirements. If required, CONTRACTOR shall contact SCE Service Planner, Mr. Daniel Hastert at (310) 738-7122 for coordination.

The bid item price for the Traffic Signal Modification bid item shall include the costs to provide all necessary hook-ups, breakers, conduit and conductors, labor, materials, tools, and equipment necessary to protect-in-place and re-use the existing service cabinet as shown on Plan for the modified traffic signal, and no further compensation shall be allowed therefor.

3.1.11 TESTING.

Testing shall conform to the provisions of the State Standard Specifications, and these Technical Provisions.

Add the following:

Traffic Signal Turn-On:

Turn-on of the modified traffic signal system shall be made on Monday through Wednesday only, and not on the day preceding a legal holiday. The CITY ENGINEER shall be notified at least (1) week prior to the intended "turn-on". The CITY ENGINEER will then schedule a pre-turn-on inspection for the workday prior to turn-on. The CONTRACTOR shall be present for the pre-turn-on inspection and shall make all repairs prior to the scheduled turn-on.

The signal turn-on shall be scheduled for 10:00 A.M. and representatives of the -95-

Technical Provisions
Specifications No. 21/22-02

CONTRACTOR, CITY, City of Santa Fe Springs technician, and necessary sub- contractors shall be present at that time. If the signal cannot be made fully operational by 1:00 P.M., the site shall be secured for non-signal operation and the CONTRACTOR will be directed to reschedule the turn-on.

All roadway signing, striping, markers, and markings shall be in place prior to the traffic signal turn-on. Delays due to scheduling and re-scheduling of signal turn-on are the responsibility of the CONTRACTOR and are subject to liquidated damages.

3.1.12 CONTROLLER ASSEMBLY.

Controller assembly shall conform to the provisions in Section 86-1.02Q(3), "Controller Cabinets", of the State Standard Specifications, these Technical Provisions, and NEMA TS-2 standards.

Replace with the following:

The CONTRACTOR shall protect in place and re-use the existing traffic signal cabinet controller assembly. CONTRACTOR shall modify the controller to accept the phasing, as required for operation as shown on traffic signal Plan. CONTRACTOR shall arrange to have a representative of the ENGINEER and a City of Santa Fe Springs technician present at the time the modified signalized intersection is ‘turned-on’.

The representatives shall be fully qualified to work in the controller assembly. The ENGINEER’S representative shall be notified at least (48) hours prior to the turn on.

3.1.13 CONTROLLER CABINET.

Controller cabinet shall conform to the provisions in Section 86-1.02Q(3), "Controller Cabinets", and Section 87-1.03Q, "Cabinets", of the State Standard Specifications, these Technical Provisions, and NEMA TS-2 standards.

Replace with the following:

The CONTRACTOR shall protect in place and re-use the existing traffic signal cabinet assembly. CONTRACTOR shall modify the controller cabinet to accept the signal phasing, as required for proper operation as shown on traffic signal Plan.

CONTRACTOR shall arrange to have a representative of the ENGINEER and a City of Santa Fe Springs technician, and a qualified representative from the controller supplier, present at the time the modified signalized intersection is ‘turned-on’.

-96-

Technical Provisions
Specifications No. 21/22-02

CONTRACTOR shall be responsible for all damage sustained to the existing signal cabinet as a result of the modification/installation, and all corrective action shall be performed at the CONTRACTOR’S expense.

Costs for the protection and modification of the existing controller cabinet assembly, as indicated on the traffic signal modification Plan, shall be considered to be included in the price paid for the Traffic Signal Modification bid item, and no additional compensation will be allowed.

3.1.14 VEHICLE SIGNAL FACES AND SIGNAL HEADS.

Vehicle signal faces, signal heads and auxiliary equipment, as shown on the Plans, and the installation thereof, shall conform to the provisions in Section 86-1.02R, “Signal Heads” and Section 87-1.03R, “Signal Heads” of the State Standard Specifications, and these Technical Provisions.

Add the following:

New traffic signal vehicle heads, including LED signal modules, shown on the Plan shall be CONTRACTOR furnished and installed. The vehicle head equipment shall be black in color to match the decorative traffic signal pole equipment.

Where a signal face is to be supported by a Type MAS side attachment slip-fitter inserted between (2) signal sections, a spacer or spacers shall be placed between the (2) sections. The vertical dimension of spacers shall permit proper seating of the serrations between the slip-fitter and the (2) sections. Holes in spacers shall align with front holes in the section housings.

In addition to the fastening through the large openings in the housing, the (2) sections shall be joined with at least (2) bolts through the holes near the front of the housings and spacers, and through matching holes in a reinforcing plate installed within each housing. Spacers shall be made of the same material as the signal housing.

Reinforcing plates shall be aluminum with a minimum thickness of 0.125-inch and shall be painted to match the housing. Bolts for joining signal sections shall be either stainless steel or cadmium-plated steel with round or binder heads.

In addition to Section 86-1.02R(2), "Signal Mounting Assemblies," of the State Standard Specifications, the following Technical Provisions shall apply whenever a terminal compartment is required:

The terminal block shall be mounted vertically and to the side of the cable inlet guide.

Sufficient lateral spacing shall be provided to allow pulling and connecting of incoming conductors without removal of the terminal block mounting screws. A minimum of one (1)-inch clearance shall be provided between the terminal block and all inside walls of the terminal compartment.

-97-

Technical Provisions
Specifications No. 21/22-02

The terminal compartment shall be provided with a captive hinged access door. With the door open, there shall be a minimum of ten-by-four-inch (10" x 4") access to the terminal compartment for connection and inspection of the terminal block. The door shall be equipped with a neoprene gasket, permanently secured, to prevent water from entering the terminal compartment and captive screws for securing door. The mounting bolt spacing and cable guide location shall be as dimensioned on drawing ES-4D of the State Standard Plans.

All new signal head indications shall utilize light emitting diode (LED) signal modules.

All LED signal modules shall conform to Section 86-1.02R(4)(b), “LED Signal Modules,” of the Caltrans Standard Specifications and these Technical Provisions.

LIGHT EMITTING DIODE SIGNAL MODULE
LED modules shall be new, manufactured by Dialight Corporation, or approved equal, and hard-wired in vehicle heads (no screw-in type). The specific models to be used in this project are the following:

Indication Model No.

Red Ball 433-1270-003XL
Yellow Ball 433-3270-901XL
Green Ball 433-2270-001XL
Red Arrow 432-1374-001XOD
Yellow Arrow 431-3374-901XOD
Green Arrow 432-2374-001XOD

3.1.15 PEDESTRIAN SIGNALS.

Pedestrian signals shall conform to the provisions in Section 86-1.02S, "Pedestrian Signal Heads," and Section 87-1.03S, “Pedestrian Signal Heads” of the State Standard Specifications and these Technical Provisions.

Add the following:

New pedestrian heads, including LED countdown pedestrian signal modules, shown on the Traffic Signal Modification Plan shall be CONTRACTOR furnished and installed. The pedestrian head equipment shall be black in color to match the decorative traffic signal pole equipment.

New pedestrian signals shall be metal and Type A.

LIGHT EMITTING DIODE PEDESTRIAN FACE “SIDE-BY-SIDE HAND AND PERSON” LED “Hand and Person” Pedestrian Signal modules shall be new, manufactured by Dialight Corporation, or approved equal, and hard-wired in vehicle heads (no screw-in type). The specific model to be used in this project for this type of indication is the following:

-98-

Technical Provisions
Specifications No. 21/22-02

Indication Model No.

Pedestrian Signal (16”x18”) 430-6479-001X

3.1.16 DETECTORS.

Detectors shall conform to the provisions in Section 86-1.02F(1)(c)(iii), "Inductive Loop Conductors", Section 86-1.02F(2)(d)(iii), "Detector Lead In Cables", and Section 87-

1.03V, "Detectors", of the State Standard Specifications and these Technical Provisions.

Add the following:

Existing Video DetectionSystem
CONTRACTOR shall carefully remove the existing video camera detection system equipment and salvage to the CITY.

New Loop Detection:

Loop detector conductors shall be Type 2.

Loop detector lead-in cables shall be Type B.

Loops shall be Type “E” and Type “E (modified)” spaced (10) feet apart, unless shown otherwise on Plan.

All cuts shall be sealed with a sealant in accordance with the State of California Specification for Hot-Melt Rubberized Asphalt Sealant per Section 86-1.02W(4) of the State Standard Specifications.

Loop wires in home runs, beginning at each loop, shall be tightly twisted together with a minimum of five (5) turns per foot. Home runs shall be cut to a sufficient width to accommodate the twisted wire.

All loops shall be connected in series. Splices shall use butt-splice connectors and shall be soldered by the hot-iron. No open flame shall be used on soldered connections.

Wires for each loop shall be marked with bands of colored tape to designate loop number, starting at the crosswalk in the number one lane and proceeding away from the intersection, then to the crosswalk in the number two lane, and so on.

3.1.17 PEDESTRIAN PUSH BUTTONS.

Pedestrian push buttons shall conform to the conditions described in Section 86-

1.02U, "Push Button Assemblies," and Section 87-1.03U, "Push Button Assemblies," of the State Standard Specifications and these Technical Provisions.

Add the following:

-99-

Technical Provisions
Specifications No. 21/22-02

New APS pedestrian push button assemblies shown on the Traffic Signal Modification Plan shall be CONTRACTOR furnished and installed. The APS pedestrian push button assembly equipment shall be black in color to match the decorative traffic signal pole equipment.

New pedestrian push-button assemblies shall be APS Type B with a 50mm, minimum, diameter actuator button. Pedestrian push-button assemblies shall be Polara Engineering, Inc., APS Navigator Pedestrian Pushbutton Assemblies.

Push-button signs shall be porcelain enameled metal and shall have the pedestrian symbol with the respective arrow direction. The signs shall attach to and be securely supported by the framework. Fasteners used shall be stainless steel tamper-proof screws for pedestrian push-button assemblies.

3.1.18 LUMINAIRES.

Luminaires shall conform to the conditions described in Section 86-1.01C(3), "LED Luminaires," of the State Standard Specifications and these Technical Provisions.

Add the following:

New luminaire assemblies shown on the Traffic Signal Modification Plan shall be CONTRACTOR furnished and installed. The luminaire assembly (Mission Bell) equipment shall be black in color to match the decorative traffic signal pole equipment. The approved luminaire shall be K825 Mission Bell-LED manufactured by King Luminaire, as part number K825-P4FL-III-100(SSL)-8060- 120 (see attached approved drawings).

The contract lump sum price bid for the installation of the safety lighting equipment shall be considered to be included in the price paid for the Traffic Signal Modification bid item and no additional compensation will be allowed, and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all the lighting installation related work involving installing, placing, and the components of new traffic control lighting system as specified on the Plan, in these Technical Provisions and as directed by the CITY.

3.1.19 REFLECTIVE STREET NAME SIGNS.

Reflective Street Name Signs shall conform to the conditions described in Section 87-

4.02C, "Internally Illuminated Street Name Signs," of the State Standard Specifications and these Technical Provisions.

Replace section with the following:

-100-

Technical Provisions
Specifications No. 21/22-02

As indicated on Plans, the existing RSNS signs shall be carefully removed from the old traffic signal pole equipment, and re-used on the new traffic signal pole equipment. The RSNS mounting bracket equipment shall be painted black in color to match the decorative traffic signal pole equipment

New reflective street name signs (RSNS) shown on the Traffic Signal Modification Plan, including mounting brackets, shall be owner-furnished (CITY) and CONTRACTOR installed. The RSNS assembly equipment shall be black in color to match the decorative traffic signal pole equipment. CONTRACTOR shall make arrangements with the CITY for pickup and delivery to the job site.

RSNS signs shall be installed on the new signal mast-arms as noted on the pole schedule of the traffic signal modification Plan. The location of the sign on the mast- arm may be adjusted (away from the standard only) to increase sign visibility.

3.1.20 PAYMENT.

Full compensation for conforming to the requirements of the applicable Traffic Signal Modification bid items shall include:

1. all works required under the Project Plan(s) and these Technical Provisions, including removals of all applicable traffic signal equipment, as well as installation of temporary traffic signals/wiring;

2. installation of foundations, conduit, pullboxes, wiring, bonding and grounding, loop detection, applicable electrical systems, installation of CONTRACTOR- furnished traffic signal pole assemblies, vehicle & pedestrian head equipment, pedestrian push buttons, safety lighting, and installation of applicable CITY- furnished RSNS equipment shall be included in the contract unit price for the traffic signal modification;

3. furnishing all labor (including various signal related technicians on turn-on day), tools, materials, equipment and incidentals necessary for doing the work, complete in place, as shown on the Plans and as directed by ENGINEER in field;

4. and all related costs shall be considered as included in the lump sum bid price paid for the applicable Traffic Signal Modification bid item(s), and no additional compensation will allowed therefore.

-101-

Technical Provisions
Specifications No. 21/22-02

3.2 SIGNING AND STRIPING IMPROVEMENTS.

In regards to signing improvements…

Add the following:

SECTION 82: SIGNS AND MARKERS

All signing shown on Plan shall be standard size, unless otherwise indicated, and be installed, relocated, or removed by CONTRACTOR at his/her own cost.

Signs - All regulatory and warning roadway signs shall be 0.80 inch aluminum and shall have 3M diamond (DG3) grade prismatic retro-reflective sheeting 3930-series with 1160-series protective graffiti film, unless otherwise specified, shall conform to the latest California MUTCD standards, and mounted on metal posts.

As applicable, fluorescent yellow-green warning signs shall be 0.80 inch aluminum and 3M diamond grade, 4083-series retro-reflective sheeting with 1160-series protective graffiti film, or approved equal.

As applicable, fluorescent yellow warning signs shall be 0.80 inch aluminum and 3M diamond grade, 4081-series retro-reflective sheeting with 1160-series protective graffiti film, or approved equal.

Posts - All metal posts shall be 12-gage galvanized square (quick-punch) poles; and anchor shall be Anchormate 2-1/4” sq. x 30”/2-1/2”sq x 12”.

Sign Location - The actual location of all roadway signs shall be approved by the CITY ENGINEER, or his designated representative, prior to installation.

In regards to striping improvements…

SECTION 310 – PAINTING

310–5 PAINTING VARIOUS SURFACES

310-5.6 Painting Traffic Striping, Pavement Markings and Curb Markings. If applicable, curb markings shall conform to the provisions in subsection 310-5.6.

For traffic stripes and pavement markings, delete the applicable subsection 310-5.6 and replace with Section 84, “Traffic Stripes and Pavement Markings” of the Caltrans Standard Specifications.

-102-

Technical Provisions
Specifications No. 21/22-02

84-1.01 Description. Replace the first two paragraphs with the following:

This work shall consist of installing traffic stripes (traffic lines) and applicable pavement markings at the specified locations and in accordance with the details shown on the Plan or designated by the ENGINEER, and as specified in these Specifications and Technical Provisions.

All new striping and markings shall be cat-tracked and approved by the CITY ENGINEER, or his designated representative, prior to final installation.

All traffic lane striping, crosswalks, limit lines, and pavement legends shall be thermoplastic.

Stripes and pavement legends shall be reflectorized.

Any removal of existing traffic stripes and markings shall be accomplished by the wet sandblasting method or waterblasting method, and includes removal of raised pavement markers. The machine used for this purpose shall meet all requirements of the air pollution control district having jurisdiction in the project area. All sand used in wet sandblasting shall be removed without delay.

All mast-arm signs shall have Diamond Grade sheeting.

84-3.04 Payment. Replace the entire subsection with the following:

The contract Lump Sum price for this work shall be included in the Signing & Striping Installation bid item, and include full compensation for traffic signing, striping, and applicable pavement markings, and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, necessary to complete the Work.

All costs for establishing alignment of traffic stripes, pavement markings, layout, temporary pavement painting, and sandblasting of existing lines and markings shall be included and no extra costs will be allowed.

SECTION 312 – PAVEMENT MARKER PLACEMENT AND REMOVAL

Delete the entire Section 312 and replace with Section 85, “Pavement Markers” of the Caltrans Standard Specifications.

85-1.03 Construction. Add the following:

The solid 4” white lines at intersections shall have a marker installed at each end.

These markers shall be placed on the line.

-103-

Technical Provisions
Specifications No. 21/22-02

85-1.04 Payment.

Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in furnishing and placing pavement markings, complete in place, including establishing alignment for traffic striping and pavement markers, as shown on the Plan, and specified in these Technical Provisions and shall be included in the contract Lump Sum price for the Signing and Striping bid item, as specified in the specifications, these Technical Provisions, and as directed by the CITY ENGINEER.

-104-

APPENDIX A

APPROVED DECORATIVE TRAFFIC SIGNAL POLE EQUIPMENT

-105-

CAL-TRANS 2015 STANDARD SPECIFICATIONS(NON-REVISED) FOR STRUCTURAL SUPPORTS FOR HIGHWAYSIGNS, LUMINAIRES AND TRAFFIC SIGNALS.MAXIMUM DESIGN FOR MANDREL TUBULARMEMBERS TO BE 48 K.S.I. MINIMUMYIELD STRENGTH. ALL OTHER TUBULARMEMBERS TO BE MAXIMUM DESIGN OF50 K.S.I. MINIMUM YIELD STRENGTH.WIND VELOCITY - 100 M.P.H. ISOTACH* ALL HARDWARE TO BE STAINLESS STEEL* ALL STEEL ASSEMBLIES GALVNIZED TO ASTM-A123* ALL WELDS IN ACCORDANCE WITH AWS WELDING CODE* ALL MATERIALS FINISH COATED SEMI-GLOSS BLACK OVER GALVANIZED11 GA. (.119") TAPERED (.14"/FT) STEEL, 10' x 5.25" x 4.5"5.1875" TOPOPENING OFCAST BASE2 PC. ASTM-A356 CAST ALUMINUMINGOT BASE; CAT. # BCSTE1827;SEE DETAIL 1 - BASE COVER DETAILACCESS PLATE ATTACHED WITH(2) 1/4-20 STAINLESS STEELBUTTON HEAD CAP SCREWSSECTION A-A5.375"3" RAD.1.75"AA0.5" NUT HOLDER WITHFASTENERS FOR GROUNDING;LOCATED @ 180° FROM HANDHOLECAULK OPENING AFTERINSTALLATION; CAULKING BYOTHERSTUBE THK. +.06PER AWS D.1.1TUBETHK.3/4" BASE PLATEASTM-A36 PLATE;36,000 KSI-YIELD9.5"TWO BASE HALVESSECURED TOGETHERWITH (4) 5/16-18 X 1"STAINLESS STEEL BUTTONHEAD CAP SCREWS4.5"4"4" NPSSTANDARDPIPETUBE EDGE BEVELED,BUTTED AGAINST PIPEAND WELDEDSEE TENONDETAIL2.97"8.5" BOLTCIRCLE5.1875" TOPOPENING OFCAST BASE9.5"10' - 0"DETAIL 1 - BASE COVERDETAIL 2 - TENONDETAIL 3 - POLE SHAFTDETAIL 6 - ANCHOR BOLTDETAIL 7 - HAND HOLEDETAIL 5 - POLE BASEDETAIL 4 - BASE TOP19.5" O.D. POINT TO POINT18.25" O.D. FLAT TO FLAT27"5/16"THROUGHHOLE5/16"THROUGHHOLE3.25"22"3/8" THICK CASTALUMINUM INGOTDRILL & TAP 1/4-20DRILL & TAP 1/4-207"11"18.875" I.D. POINT TO POINT17.5" I.D. FLAT TO FLATALL SOUTH COAST LIGHTING DECORATIVE BASE COVERS DESIGNED TO BE INSTALLED SO THAT THE BOTTOM OFTHE DECO COVER IS EVEN WITH THE BOTTOM OF THE POLE BASE PLATE; ANY DEVIATION FROM THISINSTALLATION REQUIREMENT MAY RESULT IN THE DECORATIVE BASE COVER NOT FITTING PROPERLY AROUNDTHE POLE SHAFT(4) 1" X 36" ANCHOR BOLTS WITH (2) HEXNUTS AND (2) FLAT WASHERS PER BOLT ON A0.375" THICK SQUARE PLATE (DIMENSIONSPER CALTRANS 2015 STANDARDSPECIFICATIONS)1"36".375"QTY. (4)REVISION NOTEDATECHECKED BYSOUTH COAST LIGHTING & DESIGN1101 VIA CALLEJON, STE. 100, SAN CLEMENTE, CA. 92673VOICE - 949.276.8850 / FAX - [email protected] / WWW.SOUTHCOASTLIGHTING.COMDUE TO CONTINUING IMPROVEMENTS, SOUTH COAST LIGHTING & DESIGN, INC RESERVES THE RIGHT TOCHANGE DIMENSIONS, DESIGNS, AND CONSTRUCTION FROM THAT WHICH IS SHOWN IN THIS BROCHURE.CONTACT FACTORY FOR DETAILED ENGINEERING DRAWINGSREV.Lighting & DesignSouthoastCK-040323-3S3 OF 3C.O. BELLFLOWERK.N.4.3.23BELLFLOWER BLVD & PARK STBCSTE1827_1A-10-----106-

TAPERED (.14"/FT) 30' - 0" STEEL POLE SHAFT
SEE TABLE 1 FOR POLE SPECS
NOTE:ALL VALMONT DECORATIVE POLES, BASESAND ARMS IDENTIFIED WITH VALMONT NAMEAND LOGO; SEE DETAIL 8 - MAST ARM I.D.TAG, DETAIL 9 - POLE I.D. TAGPOLE SHAFT - 16 SHARP FLUTECROSS SECTIONFLUTING STOPS 43" UPFROM BOTTOM OF POLE17' - 6" SIGNAL ARM MOUNTING HEIGHT POLE TOPFINIAL42"DETAIL 5 - BASE COVERSEE DETAIL 2 - BASEPLATE DETAILSEE DETAIL 7 - ANCHORBOLT DETAILSEE DETAIL 3 - SIGNAL MASTARM ATTACHMENT DETAILSEE DETAIL 5 - BASECOVER DETAILALL SOUTH COAST LIGHTING DECORATIVE BASE COVERS DESIGNED TO BE INSTALLEDSO THAT THE BOTTOM OF THE DECO COVER IS EVEN WITH THE BOTTOM OF THE POLEBASE PLATE; ANY DEVIATION FROM THIS INSTALLATION REQUIREMENT MAY RESULTIN THE DECORATIVE BASE COVER NOT FITTING PROPERLY AROUND THE POLE SHAFTSEE TABLE 1 FORBASE PLATE DIMENSIONS1.75" DIA. BOLT HOLESEE TABLE 1FOR BOLT CIRCLESEE TABLE 1FOR POLE BASEDIAMETERDETAIL 2 - BASE PLATE1.50" X 3.25" ALUMINUMIDENTIFICATION TAGSECURED TO POLE SHAFTWITH (2) 0.188" RIVETSAT 6" UP FROM BASE;STAMPED AS SHOWNSTANDARDPIPEARMTUBE0.44" DIAM.THROUGH HOLE.25 PER4"1.75"1.50" X 3.25" ALUMINUMIDENTIFICATION TAGSECURED TO POLE SHAFTWITH (2) 0.188" RIVETSAT 6" UP FROM BASE;STAMPED AS SHOWNDETAIL 1 - SIGNAL ARM TENONDETAIL 8 - MAST ID TAGDETAIL 9 - POLE ID TAG5.63"7.31"0.5"0.28"NOTE:DETAIL 6 - HAND HOLEDETAIL 7 - ANCHOR BOLT2"0.5" NUT HOLDER WITH FASTENERS FOR GROUNDING WILL BESUPPLIED; LOCATED @ 180° FROM HANDHOLEDETAIL 4 - LUMINAIRE ARM ATTACHMENT(4) 1.5" X 42" ANCHOR BOLTSWITH (2) HEX NUTS & (2) FLATWASHERS PER BOLT ON A STEELSQUARE PLATE (DIMENSIONS PERCALTRANS 2015 STANDARDSPECIFICATIONS)1.5"42"* ALL HARDWARE TO BE STAINLESS STEEL* ALL STEEL ASSEMBLIES GALVNIZED TO ASTM-A123* ALL WELDS IN ACCORDANCE WITH AWS WELDING CODE* ALL MATERIALS FINISH COATED OVER GALVANIZED;COLOR TO BE PER CITY SPECIFICATIONS* PER CALTRANS 2015 STANDARD SPECIFICATIONS (NON-REVISED)24" TOCENTER OFHAND HOLE2.375" DIAM.ACCESSHOLE(4) 0.63" x 1.75" LONGHIGH STRENGTH HEXHEAD BOLTS7.63"8.75"TYP.4.63"5.75"0.75"1".25" THICKGUSSETSTYP.0.25"TYP.0.25"0.25" PERAWSMATERIAL/FINISH SPECIFICATIONS2.375" DIAM.ACCESSHOLE(4) HIGH STRENGTHHEX HEAD BOLTS WITH(1) WASHER PER BOLT"J""D"0.25"THICKGUSSETS"K"SEE BELOW"C""B""B"THK.TUBETYP.AWS0.25 PERDETAIL 3 - SIGNAL ARM ATTACHMENTTYP.ARM PLATETHICKNESS"D"IN.PLATESQUARE"B"ARMLENGTH"E"BOLTCIRCLE"C"POLE PLATETHICKNESS"J"FT.MOUNT.HEIGHT"G"ARMATTACHMENT"H"ARMBASEDIAM.DEGREE"K"QTY.20'11.2512121.523°AWS0.25 PERSIGNALSPACING"F1"N/ASIGNALSPACING"F"CUT OUT TO ACCOMMODATECROSSWALK SIGNAL CALLBUTTON BOXCROSSWALK SIGNAL CUTOUT42" TOCENTEROF PPBBUTTONPOLETYPELOADCASEWINDVELOCITYmphHEIGHTBASEDIAM."A"TOPDIAM.THICKNESSBOLTCIRCLETHICKNESSANCHORBOLTSBASE PLATE DATASIZEMIN. O.D.POLE DATAIN.IN.FT.6.437530317310010.750.179317.517.51.5 x 42QTY.2PLATESQUARETABLE 127.1875"POINT TO POINT25.125"FLAT TO FLAT26.6875" I.D.POINT TO POINT24.75" I.D.FACE TO FACE21' - 8"17.5'7.375"N/A"E"MOUNTING HEIGHT - TYPE 17 = 21' - 8"STREET SIGNSBY OTHERSREFLECTIVESTREET SIGN3.5'TRAFFIC SIGNALSBY OTHERSDETAIL "U"4SEE DETAIL 4 - LUMINAIRE ARMATTACHMENT DETAIL30"12'SEE TABLE 1FOR BASE PLATETHICKNESSSEE DETAIL 11 -BACKING RINGPOLE/ARM WALL0.25" x 2" BACKINGRINGPOLE/ARM BASE PLATE0.25"CJPtcREINFORCINGFILLET = tc x 0.13DETAIL 11 - BACKING RING DETAILSEAL JOINT WITHCAULKING AFTERGALVANIZINGBACKING RINGSEE DETAIL 11 -TRAFFICRADIAL INDEXSMA/LMAPPBHAND HOLE
270°0°180°90°REVISION NOTEDATECHECKED BYSOUTH COAST LIGHTING & DESIGN1101 VIA CALLEJON, STE. 100, SAN CLEMENTE, CA. 92673VOICE - 949.276.8850 / FAX - [email protected] / WWW.SOUTHCOASTLIGHTING.COMDUE TO CONTINUING IMPROVEMENTS, SOUTH COAST LIGHTING & DESIGN, INC RESERVES THE RIGHT TOCHANGE DIMENSIONS, DESIGNS, AND CONSTRUCTION FROM THAT WHICH IS SHOWN IN THIS BROCHURE.CONTACT FACTORY FOR DETAILED ENGINEERING DRAWINGSREV.Lighting & DesignSouthoastCK-040323-1S1 OF 3C.O. BELLFLOWERK.N.4.3.23BELLFLOWER BLVD & PARK STBCSTE2542_17-3-100_20-12REMOVED IISNS COUPLING, ADDED RADIAL INDEX, PPB TO 42"6/5/23K.N.A-107-

TAPERED (.14"/FT) 30' - 0" STEEL POLE SHAFT
TYPE 29 - SEE TABLE 1 FOR POLE SPECS
MOUNTING HEIGHT (SEE DETAIL 3 - SIGNAL ARM ATTACHMENT CHART)NOTE:ALL VALMONT DECORATIVE POLES, BASESAND ARMS IDENTIFIED WITH VALMONT NAMEAND LOGO; SEE DETAIL 8 - MAST ARM I.D.TAG, DETAIL 9 - POLE I.D. TAG"E"POLE SHAFT - 16 SHARP FLUTECROSS SECTIONFLUTING STOPS 43" UPFROM BOTTOM OF POLE16' SIGNAL ARM MOUNTING HEIGHT POLE TOPFINIALDETAIL 5 - BASE COVERSEE DETAIL 4 - LUMINAIRE ARMATTACHMENT DETAILSEE DETAIL 2 - BASEPLATE DETAILSEE DETAIL 7 - ANCHORBOLT DETAILSEE DETAIL 3 - SIGNAL MASTARM ATTACHMENT DETAILSEE DETAIL 5 - BASECOVER DETAILALL SOUTH COAST LIGHTING DECORATIVE BASE COVERS DESIGNED TO BE INSTALLEDSO THAT THE BOTTOM OF THE DECO COVER IS EVEN WITH THE BOTTOM OF THE POLEBASE PLATE; ANY DEVIATION FROM THIS INSTALLATION REQUIREMENT MAY RESULTIN THE DECORATIVE BASE COVER NOT FITTING PROPERLY AROUND THE POLE SHAFT30"15' - 0"SEE TABLE 1 FORBASE PLATE DIMENSIONS2.25" DIA. BOLT HOLESEE TABLE 1FOR BOLT CIRCLESEE TABLE 1FOR POLE BASEDIAMETERDETAIL 2 - BASE PLATE1.50" X 3.25" ALUMINUMIDENTIFICATION TAGSECURED TO POLE SHAFTWITH (2) 0.188" RIVETSAT 6" UP FROM BASE;STAMPED AS SHOWNSTANDARDPIPEARMTUBE0.44" DIAM.THROUGH HOLE.25 PER4"1.75"1.50" X 3.25" ALUMINUMIDENTIFICATION TAGSECURED TO POLE SHAFTWITH (2) 0.188" RIVETSAT 6" UP FROM BASE;STAMPED AS SHOWNDETAIL 1 - SIGNAL ARM TENONDETAIL 8 - MAST ID TAGDETAIL 9 - POLE ID TAG5.63"7.31"0.5"0.28"NOTE:DETAIL 6 - HAND HOLEDETAIL 7 - ANCHOR BOLT2"0.5" NUT HOLDER WITH FASTENERS FOR GROUNDING WILL BESUPPLIED; LOCATED @ 180° FROM HANDHOLEDETAIL 4 - LUMINAIRE ARM ATTACHMENT(4) 2" X 42" ANCHOR BOLTS WITH(2) HEX NUTS & (2) FLATWASHERS PER BOLT ON A STEELSQUARE PLATE (DIMENSIONS PERCALTRANS 2015 STANDARDSPECIFICATIONS)2"42"* ALL HARDWARE TO BE STAINLESS STEEL* ALL STEEL ASSEMBLIES GALVNIZED TO ASTM-A123* ALL WELDS IN ACCORDANCE WITH AWS WELDING CODE* ALL MATERIALS FINISH COATED OVER GALVANIZED;COLOR TO BE PER CITY SPECIFICATIONS* PER CALTRANS 2015 STANDARD SPECIFICATIONS (NON-REVISED)24" TOCENTER OFHAND HOLEREFLECTIVESTREET NAME SIGN3.5'TRAFFIC SIGNALSBY OTHERSSTREET SIGNSBY OTHERSDETAIL "U"4SEE DETAIL 1 - SIGNAL ARMTENON DETAIL2" DIAM.ACCESSHOLE(4) 0.63" x 1.75" LONGHIGH STRENGTH HEXHEAD BOLTS7.63"8.75"TYP.4.63"5.75"0.75"1".25" THICKGUSSETSTYP.0.275"TYP.0.275"0.275" PERAWSMATERIAL/FINISH SPECIFICATIONS2.375" DIAM.ACCESSHOLE(4) HIGH STRENGTHHEX HEAD BOLTS WITH(1) WASHER PER BOLT"J""D"0.25"THICKGUSSETS"F"SEE BELOW"C""B""B"THK.TUBETYP.AWS0.25 PERDETAIL 3 - SIGNAL ARM ATTACHMENTTYP.ARM PLATETHICKNESS"D"IN.PLATESQUARE"B"ARMLENGTH"E"BOLTCIRCLE"C"POLE PLATETHICKNESS"J"FT.MOUNT.HEIGHT"G"ARMATTACHMENT"H"ARMBASEDIAM.DEGREEQTY.22'-8"16'7.375"AWS0.25 PERSIGNALSPACING"F1"SIGNALSPACING"F"42" TOCENTEROF PPBBUTTONPOLETYPELOADCASEWINDVELOCITYmphHEIGHTBASEDIAM."A"TOPDIAM.THICKNESSBOLTCIRCLETHICKNESSANCHORBOLTSBASE PLATE DATASIZEMIN. O.D.POLE DATAIN.IN.FT.QTY.PLATESQUARETABLE 17.687530319410012.1250.31251917.52 x 42225'11.2512121.523°N/AN/A13.125"42"33.375" POINT TO POINT30.75" FLAT TO FLAT32.875" I.D. POI NT T
O P
OINT

30.5" I.D. FACE TO FACE23'16'8"30'11.2512121.523°N/AN/ASEE TABLE 1FOR BASE PLATETHICKNESSSEE DETAIL 11 -BACKING RINGPOLE/ARM WALL0.25" x 2" BACKINGRINGPOLE/ARM BASE PLATE0.25"CJPtcREINFORCINGFILLET = tc x 0.13DETAIL 11 - BACKING RING DETAILSEAL JOINT WITHCAULKING AFTERGALVANIZINGBACKING RINGSEE DETAIL 11 -TRAFFICRADIAL INDEXSMA/LMAPPBHAND HOLE
270°0°180°90°CUT OUT TO ACCOMMODATECROSSWALK SIGNAL CALLBUTTON BOXCROSSWALK SIGNAL CUTOUTREVISION NOTEDATECHECKED BYSOUTH COAST LIGHTING & DESIGN1101 VIA CALLEJON, STE. 100, SAN CLEMENTE, CA. 92673VOICE - 949.276.8850 / FAX - [email protected] / WWW.SOUTHCOASTLIGHTING.COMDUE TO CONTINUING IMPROVEMENTS, SOUTH COAST LIGHTING & DESIGN, INC RESERVES THE RIGHT TOCHANGE DIMENSIONS, DESIGNS, AND CONSTRUCTION FROM THAT WHICH IS SHOWN IN THIS BROCHURE.CONTACT FACTORY FOR DETAILED ENGINEERING DRAWINGSREV.Lighting & DesignSouthoastCK-040323-2S2 OF 3C.O. BELLFLOWERK.N.4.3.23BELLFLOWER BLVD & PARK STBCSTE3142_19-4-100_25(30)-15REMOVED IISNS COUPLING, ADDED RADIAL INDEX, PPB TO 42"6/5/23K.N.A-108-

APPENDIX B

APPROVED SAFETY LIGHT BELL LUMINAIRE FIXTURE
-109-

6-20-23Q-2303046-1CONCEPT DRAWINGMJSC3BELLFLOWER & PARK DECO TRAFFIC SIGNAL TO ACCEPT2" IPS (2 3/8" O.D.)PIPE ARMU-CLAMP FOR 2" IPS PIPE4" LONG21 5/8"24 3/4"SET SCREWS 1/4-20PARALLEL TO ROAD.2 ST.STL CUP POINTTWIST LOCK PHOTOCELL RECEPTACLE(THIS SIDE TO BE 6" LONG)QUICK DISCONECTS C/W10' WIRING HARNESS(THIS SIDE TO BE 10' LONG)100ANSI 1"X1" STANDARDWATTAGE LABELLED-110-

K825K825 MISSION BELL - LEDMISSION BELL - LED

PRODUCT SPECIFICATIONSPRODUCT SPECIFICATIONS
CERTIFICATION:

CSA US Listed
Suitable for wet locations
ISO 9001
IP66
ARRA Compliant
LM79 / LM80 Compliant
DRIVER INFO:
>0.9 Power Factor
<20% Total Harmonic Distortion
120 - 277V & 347 - 480V
-40°C Min. Case Temperature
70°C Max. Case Temperature
Surge Protection: ANSI C136.2
extreme level 20kV/10kA
Dimming Capable: 1-10vdc
EPA:

Flat Lens: 1.13 sq. ft.

FIXTURE WEIGHT:

Flat Lens: 42 lbs
21 5/8"
24 3/4"

LED ENGINE
Light engine shall include an ar-
ray of 60 or 84 solid state Cree
X-Series high power LEDs (light
emitting diodes). The emitters
shall be mounted to a metal core
circuit board using SMT tech-
nology. The LEDs and circuit
boards shall then be mounted
to a high performance heat sink
which is vented to the outside
ambient air to provide dynamic
airflow for cooling the system.

OPTICS
External light control shall consist
of high precision refractive lenses
mounted above the LED emitter
arrays in such a way to achieve
optimum uplight control. The
lenses shall also control horizon-
tal light distribution so that Type
II, III, IV or V IESNA distribution
patterns are achieved.

LUMINAIRE CONSTRUCTION
The luminaire shall consist of a
heavy cast aluminum housing
that acts as the enclosure for the
engine and is of adequate thick-
ness to give structural rigidity.

The engine must be affixed to the
inside of the housing with stain-
less steel screws.

The bottom decorative por-
tion of the K825 Mission Bell
fixture is comprised of a one-
piece spun aluminum alloy with
a minimum thickness of 0.09”.

The spinning is permanently af-
fixed to the cast housing with the
use of stainless steel hardware.

PLUMBIZER
The K825 Mission Bell comes with
multiple mounting options in-
cluding the KPL10, KPL11, KPL20,
KPL21, KPL30, KPL31 and KPL40.

Please contact King Luminaire for
more details and specifications.

DRIVER
The LED universal dimmable driv-
er will be class 2 and capable of
120 - 277V or 347 - 480V input
voltage, greater than 0.9 power
factor, less than 20% total har-
monic distortion. The case tem-
perature of the driver can range
from -40°C to 70°C. Each LED
system comes with a standard
surge protection designed to
withstand up to 20kV/10kA of
transient line surge as per IEEE
C62.41.2 C High. An in-line ferrite
choke is utilized to provide pro-
tection against EFT’s. The driver
assembly will be mounted on a
heavy duty fabricated aluminum
bracket to allow complete tool-
less maintenance. tool-less main-
tenance. Dimming capable using
1-10vdc (10% to 100%), 10v PWM,
or resistance.

PHOTOMETRICS
Fixtures are tested to IESNA
LM79 specifications. These re-
ports are available upon request.

CHROMATICITY
High output LEDs come standard
at 3000K & 4000K (+/- 300K)
with a minimum nominal 70 CRI.

Additional CCT emitters are avail-
able upon request.

LUMEN MAINTENANCE
Reported (TM21) and Calculated
(L70) reports are available upon
request with a minimum calcu-
lated value of 100,000 hrs.

WIRING
All internal wiring and connec-
tions shall be completed so that
it will be necessary only to attach
the incoming supply connectors
to Mate-N-Lok connectors or to a
terminal block. Mate-N-Lok shall
be certified for 600V operation.

Internal wire connectors shall be
crimp connector only and rated
at 1000V and 150°C. All wiring to
be CSA certified and/or UL listed,
type SFF-2, SEWF-2, or SEW-2
No. 14 gauge, 150°C, 600V, and
color coded for the required volt-
age.

THERMALS
Fixtures tested to DOE sanc-
tioned standards to determine
the maximum in-situ solder-point
or junction-point temperatures of
the LED emitters. This report is
available upon request.

FINISH
Housing is finished with a 13 step
KingCoat™ SuperDurable poly-
ester TGIC powder coat. Stan-
dard colors include strobe white,
brown metal, marina blue, gate
gray, Chicago bronze, standard
gold, standard black, federal
green and rain forest. Please see
our website for a complete list
of colors. RAL and custom color
matches are available.

MISCELLANEOUS
All exterior hardware and fasten-
ers, wholly or partly exposed,
shall be stainless steel alloy. All in-
ternal fasteners are stainless steel
or zinc coated steel. All remain-
ing internal hardware is stain-
less steel, aluminum alloy, or zinc
coated steel.

WARRANTY
The K825 Mission Bell LED lumi-
naire comes with a 7 year limited
warranty.

The K825 Mission Bell provides a traditional
bell pendant designed to increase roadway
performance while providing superior spac-
ing. Suitable for off roadway applications
as well, this time-less design can be used in
both contemporary and historical settings.

Contact King Luminaire for product specifications
that are exempt from CSA Certification.
08-11-2021
-111-

K825 MISSION BELL - LED
K825

LUMINAIRE STYLE
K825 - Mission Bell

OPTICAL OPTIONS
P4FL - P4 Flat (No Lens)

IES LIGHTING

CLASSIFICATION
II - Type 2
III - Type 3
IV - Type 4
V - Type 5
SOURCE
SSL - Solid State
8060 (60 emitters, 25 - 120W)
8084 (84 emitters, 150 - 200W)
SERIES

WATTAGE
25, 40, 60, 75, 100, 120, 150
---(SSL)-
*Additional wattages available,
please contact King Luminaire
120V (120-277V)
480V (347-480V)*
*Select wattages available within
this range, contact King Luminaire.
120V will be provided if blank.

LINE VOLTAGE
-
KPL10, KPL11, KPL20,
KPL21, KPL30, KPL31,
KPL40
*leave blank if
not required

PLUMBIZER
--

PHOTO CONTROL OPTIONS
PR - Photo Receptacle, available with
KPL11, KPL20, KPL21, KPL30, KPL31
PE - Photo Receptacle, PR and Photo Eye.

Available with KPL11, KPL20, KPL21, KPL30, KPL31
PEBC - Photo Electric Buttoncell
* leave blank if not required

PAINT COLOR
GN -Federal Green
BE -Blue
GY -Gray
BN -Brown
BK -Black
BZ -Bronze
*Additional options
available on website. BK
will be provided if blank.
-

WATTAGE

SELECTOR
WS - Wattage
Selector
* leave blank if
not required
CCT
3K - 3000K
4K - 4000K
-

HOW TO ORDERHOW TO ORDER
www.scgrp.com

PLUMBIZER/MOUNTING OPTIONSPLUMBIZER/MOUNTING OPTIONS
KPL10 KPL11*KPL20**KPL21**KPL31**KPL40KPL30**
*Available with PR7
**Available with PR7 or finial
1 3/4"
KPL-10
5 5/8"
KPL-11
10"
KPL-31KPL-21
6 1/2"
KPL-20
7 5/8"
KPL-30
7 3/8"
KPL-40
7 3/4"
-112-

-113-

-114-

-115-