11-B
TO: Honorable Mayor and Members of the City Council
ATTENTION: Ryan Smoot, City Manager
FROM: Elizabeth Oba, Director of Planning and Building Services Alan Cook, Building Official
SUBJECT: Consideration and possible action to conduct a public hearing and:
1) Adopt Urgency Ordinance No. 1450 – An Urgency Ordinance adopting the 2025 Editions of the California Building Code, the California Residential Code, the California Electrical Code, the California Mechanical Code, the California Plumbing Code, the California Energy Code, the California Fire Code, the California Existing Building Code, the California Wildland-Urban Interface Code, the California Green Building Standards Code, the California Referenced Standards Code, and the California Building Standards Administrative Code; making certain amendments based upon local conditions; and amending the Bellflower Municipal Code to reflect such changes; and 2) Waive further reading and adopt Ordinance No. 1449 – An Ordinance adopting the 2025 Editions of the California Building Code, the California Residential Code, the California Electrical Code, the California Mechanical Code, the California Plumbing Code, the California Energy Code, the California Fire Code, the California Existing Building Code, the California Wildland- Urban Interface Code, the California Green Building Standards Code, the California Referenced Standards Code, and the California Building Standards Administrative Code; making certain
amendments based upon local conditions; and amending the Bellflower Municipal Code to reflect such changes.
DATE: September 22, 2025
EXECUTIVE SUMMARY
On September 3, 2025, the City Council introduced and waived first reading of Ordinance No. 1449. A public hearing was set for September 22, 2025 for second reading and adoption of the Ordinance. Second reading and adoption is recommended. Beginning October 1, 2025 to June 1, 2031, a city cannot make additional local amendments to the California Building Standards Code (“CBSC”) that regulate residential units. Given the limited window for the code adoption process and to continue the City’s current enforcement practices, Urgency Ordinance No. 1450 is also recommended for adoption. Except for the urgency findings, Ordinance No. 1450 is identical to Ordinance No. 1449. If approved, the Urgency Ordinance would take effect immediately and the regular Ordinance would take effect 30 days after adoption. However, the provisions within the Ordinances will become operative on January 1, 2026.
-1-
Staff Report - 2025 CBSC; Ordinance No. 1449 and Urgency Ordinance No. 1450 September 22, 2025
RECOMMENDATION TO CITY COUNCIL
1. Open the public hearing; take testimonial and documentary evidence; and after considering the evidence, adopt Urgency Ordinance No. 1450 by at least a four-fifths (4/5) vote to take effect immediately; and Waive further reading and adopt Ordinance No. 1449; or
2. Alternatively, discuss and take other action related to this item.
FISCAL IMPACT
The recommended actions will result in no financial impact to the City’s General Fund. The cost to administer this process is captured through Building Department permits and fees.
ATTACHMENTS
Urgency Ordinance No. 1450 ................................................................................................. 3 Ordinance No. 1449 ............................................................................................................. 34 September 3, 2025, Staff Report (Without Attachments) .................................................... 65
-2-
CITY OF BELLFLOWER
ORDINANCE NO. 1450
AN URGENCY ORDINANCE ADOPTING THE 2025 EDITIONS OF THE
CALIFORNIA BUILDING CODE, THE CALIFORNIA RESIDENTIAL CODE,
THE CALIFORNIA ELECTRICAL CODE, THE CALIFORNIA
MECHANICAL CODE, THE CALIFORNIA PLUMBING CODE, THE
CALIFORNIA ENERGY CODE, THE CALIFORNIA FIRE CODE, THE
CALIFORNIA EXISTING BUILDING CODE, THE CALIFORNIA
WILDLAND-URBAN INTERFACE CODE, THE CALIFORNIA GREEN
BUILDING STANDARDS CODE, THE CALIFORNIA REFERENCED
STANDARDS CODE, AND THE CALIFORNIA BUILDING STANDARDS
ADMINISTRATIVE CODE; MAKING CERTAIN AMENDMENTS BASED
UPON LOCAL CONDITIONS; AND AMENDING THE BELLFLOWER
MUNICIPAL CODE TO REFLECT SUCH CHANGES
THE CITY COUNCIL DOES ORDAIN AS FOLLOWS:
SECTION 1. Findings. The City Council finds as follows:
A. The City may adopt model codes by reference pursuant to Government Code §§ 50022.2, et seq.;
Health and Safety Code § 17958 requires the City to adopt certain codes that are set forth in Health and Safety Code § 17922 and published in the California Code of Regulations;
In accordance with Health and Safety Code § 17958.7, it is in the public interest to adopt the most recent codes published by the California Building Standards Commission;
Notice of public hearing to consider this Ordinance was published pursuant to Government Code § 6066 and a duly noticed public hearing was held on September 22, 2025 regarding the adoption of this Ordinance; Pursuant to § 50022.6 of the Government Code, at least one copy of all codes adopted by reference in this Ordinance were filed with the City Clerk of the City and were available for public inspection for at least 15 days preceding the date of the hearing;
Pursuant to Government Code § 50022.9, the City Council intends to adopt by reference, with local amendments, the following 2025 codes in their entirety as if set forth in full herein (collectively, the “Uniform Codes”):
1. The California Building Code, 2025 Edition - Vol. I & II as published in Title 24, Part 2 of the California Code of Regulations;
2. The California Residential Code, 2025 Edition, as published in Title 24, Part 2.5 of the California Code of Regulations;
3. The California Electrical Code, 2025 Edition, as published in Title 24, Part 3 of the California Code of Regulations;
City of Bellflower
Ordinance No. 1450
4. The California Mechanical Code, 2025 Edition, as published in Title 24, Part 4 of the California Code of Regulations;
5. The California Plumbing Code, 2025 Edition, as published in Title 24, Part 5 of the California Code of Regulations;
6. The California Energy Code, 2025 Edition, as published in Title 24, Part 6 of the California Code of Regulations;
7. The California Wildland-Urban Interface Code, 2025 Edition, as published in Title 24, Part 7 of the California Code of Regulations;
8. The California Fire Code, 2025 Edition, as published in Title 24, Part 9 of the California Code of Regulations. In adopting the CFC, the City Council incorporates the findings set forth in Section 1 of Ordinance Nos. 1438 (adopted January 27, 2025) and 1439 (adopted February 10, 2025) as if fully set forth;
9. The California Existing Building Code, 2025 Edition, as published in Title 24, Part 10 of the California Code of Regulations;
10. The California Green Building Standards Code, 2025 Edition, as published in Title 24, Part 11 of the California Code of Regulations; and
11. The California Referenced Standards Code, 2025 Edition, as published at Title 24, Part 12, of the California Code of Regulations.
G. Assembly Bill 130 (2025) (“AB 130”), among other things, amended Health and Safety Code §17958 by prohibiting modifications to building standards affecting residential units between October 1, 2025, and June 1, 2031, unless certain conditions exist, including a finding that the local amendments are “substantially equivalent" to prior provisions; H. The local amendments incorporated into this Ordinance are substantially equivalent to existing regulations as adopted under the 2022 uniform codes.
To provide certainty to property owners and potential permittees, and ensure the safety of all structures within the City, it is imperative that the regulations adopted by this Ordinance become effective not later than September 30, 2025; and
|. Based upon these findings, the City Council finds that this Ordinance should be adopted on an urgency basis to preserve the public health, safety, and welfare in accordance with Government Code §§ 36934 and 36937(b).
SECTION 2. In accordance with Health and Safety Code § 17958.7, the City Council finds that there are local climatic, geographic, and topographic conditions justifying the various local amendments to the Uniform Codes. The City Council finds and determines that certain building standards established by these Codes are inadequate
City of Bellfiower
Ordinance No. 1450
for use and enforcement in the City of Bellfiower because of unique geological conditions prevailing within the City.
Such geological conditions affect the potential consequences of soil strength loss due to known liquefaction zones within the City and the nearby location of earthquake faults, resulting in the possibility of significant loss of life and structures within the City unless appropriate building standards are adopted. The lessons learned from previous earthquakes, such as the Northridge and Whittier earthquakes, were refined with studies and tests that have continued since the last Uniform Code adoption cycle. The results of these studies and tests necessitate adoption of further amendments to the structural requirements of the Uniform Codes. The proposed structural amendments are detailed in the sections of the Bellflower Municipal Code (“BMC”) adopted by this Ordinance.
Additionally, the City of Bellflower is a densely populated area within a climate system capable of producing major winds, fire and rain related disasters including, without limitation, those caused by the Santa Ana winds and El Nifio (or La Nifia) subtropical-like weather. This region is especially susceptible to more active termite and wood attacking insects and microorganisms. Los Angeles County and the City of Bellflower are located in a semi-arid Mediterranean type climate which predisposes all fuels, including wood shingles to rapid ignition and spread of fire. Therefore, there exists a need for additional fire protection measures. Local amendments needed to mitigate these local conditions are also included with this Ordinance.
SECTION 3. BMC Chapter 15.04 is amended in its entirety to read as follows:
“Chapter 15.04 BUILDING CODE
15.04.010 Building Code — Adopted by Reference; Where filed.
Chapters 1 through 35, and Appendix Chapters B, F, G, H, I, J, and P of California Code of Regulations Title 24, Parts 1 and 2 (the 2025 California Building Code) are adopted by reference as the Building Code of the City of Bellflower.
In accordance with Government Code § 50022.6, one copy of the chapters and appendices must remain on file with the Building Official within the Planning Department and must be at all times maintained by the Building Official for use and examination by the public.
15.04.020 Definition of terms.
Unless the contrary is stated or clearly appears from the context, the following definitions govern the construction of the words and phrases used in this Title. Words and phrases not defined by this chapter have the meanings set forth in the applicable Code as set forth in Title 24 of the Code of California Regulations. If the definition of any term contained in this Title conflicts with the definition of the same term in the applicable Code, then the definition contained in this Title governs.
“Building and Safety Division” means the Planning Department’s Building Division for the City. “Code” or “Codes” means the applicable 2025 code adopted by reference in this Chapter.
City of Bellflower
Ordinance No. 1450
“Health Office” means the Los Angeles County Department of Health Services.
15.04.030 Resolution of conflicts in application.
In the event of any conflict or ambiguity between any provision contained in the Codes and Title 15, Title 15 will govern.
15.04.040 Administrative Provisions and Amendments.
A. Chapter 1, Division II (Scope and Administration), Section 101 is amended as follows:
SECTION 101 — TITLE, PURPOSE, INTENT AND SCOPE
B. Chapter 1, Division II (Scope and Administration), Sections 101.1, 101.2, 101.4, are amended and Sections 101.4.9 through 101.4.12 are hereby added to read as follows:
101.1 Title. These regulations may be referred to as the Administrative Provisions of the California Building Codes of the State of California and other Codes as adopted by Title 15 of the Bellflower Municipal Code.
101.2 Scope. The provisions of the codes apply to the construction, alteration, conversion, relocation, enlargement, improvement, replacement, repair, equipment, use and occupancy, location, maintenance, removal and demolition of every building or structure or any appurtenances connected or attached to such buildings or structures.
Exception: Detached one— and two-family dwellings and townhouses not more than three stories above grade plane in height with a separate means of egress, and their accessory structures not more than three stories above grade plane in height, must comply with the California Building Code or the California Residential Code. 101.4 Referenced codes. Codes listed in Sections 101.4.1 through 101.4.12 and referenced elsewhere in the codes are part of the requirements of the codes to the prescribed extent of each such reference.
101.4.9 Electrical Code. The California Electrical Code as adopted in BMC § 1508.010 applies to the installation and removal of electrical conductors, equipment, and raceways; signaling and communications conductors, equipment, and raceways; and optical fiber cables and raceways for the following: (1) Public and private premises, including buildings, structures, mobile homes, recreational vehicles, and floating buildings; (2) Yards, lots, parking lots, carnivals, and industrial substations; (3) Installations of conductors and equipment that connect to the supply of electricity; and (4) Installations used by the electric utility, such as office buildings, warehouses, garages, machine shops, and recreational buildings, that are not an integral part of a generating plant, substation, or control center.
City of Bellflower
Ordinance No. 1450
101 .4.10 Residential Code. The California Residential Code as adopted in BMC §
15.60.010 applies to the construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, removal and demolition of detached one- and two-family dwellings and townhouses not more than three stories above grade plane in height with a separate means of egress and their accessory structures not more than three stories above grade plane in height.
101.4.11 Green Building Standards Code. The mandatory provisions of the California Green Building Standards Code as adopted in BMC § 15.64.010 apply to the planning, design, operation, construction, use and occupancy of every newly constructed building or structure.
101 .4.12 Referenced Standards Code. The provisions of the California Referenced Standards Code as adopted in BMC § 15.80.010 apply to all buildings and structures.
C. Chapter 1, Division ll (Scope and Administration), Section 102.6 is amended as follows:
102.6 Existing structures. The legal occupancy of any structure existing on the date of adoption of the codes may continue without change, except as is specifically covered in the codes or as is deemed necessary by the Building Official for the general safety and welfare of the occupants and the public.
D. Chapter 1, Division II (Scope and Administration), Section 103 — Code Compliance Agency, is amended as follows:
SECTION 103 — BUILDING AND SAFETY CODE COMPLIANCE
103.1 Creation of Agency. The Building and Safety Division is established as part of the Planning Department. Unless othenNise provided, the Building Official is authorized to implement, administer, and enforce the codes as adopted by this Title. 103.2 Appointment. The Building Official is appointed by the City Manager, or designee.
More than one Building Official may be appointed by the City Manager, or designee, at his or her discretion.
103.3 Deputies. in accordance with the prescribed procedures of this jurisdiction and with the concurrence of the City Manager, or designee, the Building Official may appoint a deputy Building Official, the related technical officers, inspectors, plan examiners and other agents. Such appointed agents have powers as delegated by the Building Official.
E. Chapter 1, Division II (Scope and Administration), Section 105 — Permits, is amended as follows:
City of Bellflower
Ordinance No. 1450
SECTION 105 -— PERMITS
105.1 Required. Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the codes, or to cause any such work to be done, must obtain a valid permit from the Building Official.
Work performed without a permit is a misdemeanor. in addition, any such work constitutes a public nuisance and may be abated in accordance with the BMC. 105.1.1 Time-based permit. In lieu of an individual permit for each alteration to an already approved electrical, gas, mechanical or plumbing installation, the Building Official is authorized to issue a permit, valid for a specific time period not exceeding one year, upon application therefore to any person, firm or corporation regularly employing one or more qualified trade persons in the building, structure or on the premises owned or operated by the applicant for the permit.
105.1.2 Permit Records. The Building Official may detail the scope, parameters and conditions of this permit. The permit may be revoked when it is determined by the Building Official that the outlined scope, parameters, conditions or intent of the codes is not upheld by the permittee. The Building Official has access to such records at all times and such records must be filed with the Building Official as designated. 105.2 Work exempt from permit. Exemptions from permit requirements of the codes do not grant authorization for any work to be done in any manner in violation of the provisions of the codes or any other applicable law or policy. Except when otherwise subject to City review and approval or when otherwise required by applicable law, permits are not required for the following:
Building:
1. One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses not more than 10 feet in height, provided the floor area does not exceed 120 square feet and conforms to the zoning regulations of the BMC.
2. Chain-link, wrought-iron, wood and similar fences not over 6 feet high.
3. Concrete or masonry block walls not over 5 feet 11 inches in height and not required as part of the development process.
4. Retaining walls that are not over 4 feet in height measured from the bottom of the footing to the top of the wall and not required as part of the development process.
5. Light standards which do not exceed 15 feet in height.
City of Bellflower
Ordinance No. 1450
6. Flagpoles not erected upon a building and not more than 15 feet in height.
7. A tree house provided that:
7.1 The tree house does not exceed 64 square feet in area or 8 feet in height from floor to roof.
7.2 The ceiling height as established by door height or plate line does not exceed 6 feet.
8. Oil derricks.
9. Water tanks supported directly on grade if the capacity does not exceed 5,000 gallons and the ratio of height to diameter or width is not greater than 2:1.
10. Sidewalks and driveways that are not more than 18 inches above adjacent grade, not over any basement or story below, not part of an accessible route and not part of a commercial site.
11.Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work.
12.Temporary motion picture, television and theater stage sets and scenery.
13.Prefabricated swimming pools accessory to a Group R, Division 3 Occupancy in which the pool walls are entirely above the adjacent grade and the capacity does not exceed 5,000 gallons.
14.Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.
15.Swings and other playground equipment.
16.Canopies or awnings attached to a Group R or U Occupancy and extending not more than 54 inches from the exterior wall of the building.
17.Temporary sheds, office or storage buildings, and other structures incidental to and work authorized by a valid permit during construction activities. Such structures must be removed upon expiration of the permit or completion of the work covered by the permit.
18.Non-fixed and movable fixtures, cases, racks, counters and prefabricated partitions not over 5 feet 9 inches in height.
19.Steel tanks supported on a foundation not more than two feet (610 mm) above grade when the height does not exceed 1.5 times the diameter.
City of Bellflower
Ordinance No. 1450
Electrical:
1. Repairs and maintenance: Minor repair work, including the replacement of lamps or the connection of approved portable electrical equipment to approved per- manently installed receptacles.
2. Radio and television transmitting stations: The provisions of the codes do not apply to electrical equipment used for radio and television transmissions but do apply to equipment and wiring for a power supply and the installation of towers and antennas.
3. Temporary testing systems: A permit is not required for the installation of any temporary system required for the testing or servicing of electrical equipment or apparatus.
Gas:
1. Portable heating appliance.
2. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe.
Mechanical:
1. Portable heating appliance.
2. Portable ventilation equipment.
3. Portable cooling unit.
4. Steam, hot or chilled water piping within any heating or cooling equipment regulated by the codes.
5. Replacement of any part that does not alter its approval or make it unsafe.
6. Portable evaporative cooler.
7. Self-contained refrigeration system containing 10 pounds or less of refrigerant and actuated by motors of 1 horsepower (746 W) or less.
Plumbing:
1. The stopping of leaks in drains, water, soil, waste or vent pipe, provided, however, that if any concealed trap, drain pipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with the new material, such work is considered new work and a permit must be obtained and inspection made as provided in the codes.
-10.
City of Bellflower
Ordinance No. 1450
2. The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures and the removal and reinstallation of water closets in their originally approved location, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures.
105.2.1 Emergency repairs. Where equipment replacements and repairs are performed in an emergency situation, the permit application must be submitted within the next working business day to the Building Official.
10522 Public service agencies. A permit is not required for installation, alteration or repair of generation, transmission, distribution or metering or other related equipment that is under the ownership and control of public service agencies by established right. 105.3 Application for permit. To obtain a permit, the applicant must first file an application therefore in writing on a form furnished by the Building Official for that purpose.
Such application must:
1. Identify and describe the work to be covered by the permit for which application is made.
2. Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work.
3. Indicate the use and occupancy for which the proposed work is intended.
4. Be accompanied by construction documents and other information as required in Section 107.
5. State the valuation of the proposed work.
6. Be signed by the applicant, or the applicant‘s authorized agent.
7. Give such other data and information as required by the Building Official. 105.3.1 Action on application. The Building Official will examine or cause to be examined applications for permits and amendments within a reasonable time after filing.
If the application or the construction documents do not conform to the requirements of applicable law, the Building Official must reject such application in writing.
No building permit or other similar applicable permit bearing on property development or use including additions, modifications or revisions may be issued unless and until the review and approval of all other departments and agencies having legal authority for review of construction projects have found the construction project to be in compliance with all applicable code provisions or entitlements.
-11-
City of Bellflower
Ordinance No. 1450
When the Building Official is satisfied that the proposed work conforms to the requirements of applicable law, the Building Official must issue a permit in accordance with applicable law.
105.3.2 Time limitation of application. An application for a permit for any proposed work is deemed expired 180 days after the completion of the first submittal review unless a permit has been issued. The Building Official is authorized to grant one extension of time of an unexpired application for additional period not exceeding 180 days. The extension must be requested in writing and justifiable cause demonstrated.
For the purpose of this section, contact by a City representative indicating the review is completed is deemed completion of any submittal review. 105.4 Permit issuance. The application, plans, specifications, computations, and other data filed by an applicant for a permit will be reviewed by the Building Official. Such plans may be reviewed by other City officials to verify compliance with applicable law. If the Building Official finds that the work described in an application for a permit and the plans, specifications and other data filed therewith conform to applicable law, and that the specified fees have been paid, the permit must be issued.
When the Building Official issues the permit where plans are required, they must endorse in writing or stamp the plans and specifications. Such approved plans and specifications cannot be changed, modified or altered without authorization from the Building Official, and all work regulated by the codes must be done in accordance with the approved plans. 105.5 Validity of permit. lssuing a permit or approving plans, specifications, and computations cannot be construed to be a permit for, or an approval of, any violation of applicable law. Permits presuming to give authority to violate or cancel the provisions of the codes or other ordinances of the City are not valid.
Issuing a permit based on construction documents and other data does not prevent the Building Official from requiring the correction of errors in the construction document and other data. Any addition to or alteration of approved construction documents must be approved in advance by the Building Official, as evidenced by the issuance of a new or amended permit. The Building Official is also authorized to prevent occupancy or use of a structure where in violation of the codes or of any other ordinances of this City. 105.6 Expiration. Every permit issued by the Building Official underthe provisions of the codes will expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 12 months from the date issued, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days, except that no permit expires before a date 12 months from the date of being issued. Before such work can be commenced or recommenced, the Building Official must issue a new permit. The Building Officila may not extend, nor is any permit valid, for any period exceeding three years from the original date a permit was issued.
City of Bellflower
Ordinance No. 1450
For the purpose of this section, if an inspection approval is not recorded, the work authorized by the permit is deemed not commenced, suspended or abandoned. (1) Requesting extension of an unexpired permit: Any permittee holding an unexpired permit may apply for an extension of time within which permittee may commence work under that permit when the permittee is unable to commence or recommence work within the time required by this section for good cause shown. The Building Official may extend the time for action by the permittee for a period not more than 180 days upon written request by the permittee showing good cause beyond the control of the permittee have prevented action from being taken. Subject to approval of the Building Official, permits extended in this manner do not require additional permit fees. (2) Requesting reissuance of an expired permit: Any permittee holding a permit which expired may apply for a reissuance of the permit subject to compliance with current regulations and payment of plan check and permit fees. Plans must be resubmitted for plan check.
105.6.1 Expiration of Permit for Unlawfut Structure. Notwithstanding any provision of Section 105.6, if a building permit was issued in order to bring an un-permitted structure or other unlawful, substandard, or hazardous condition into compliance with any applicable law, ordinance, rule or regulation, such permit expires 90 days after the date on which the permit was issued. The Building Official may extend the validity of the permit for a period not exceeding 90 days beyond the initial 90-day limit upon written request by the applicant filed with the Building Official before the expiration date of the original permit. 105.7 Suspension or revocation. The Building Official is authorized to suspend or revoke a permit issued under this code wherever the permit is issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any ordinance or regulation or any of the provisions of the codes.
105.8 Placement of permit. The building permit or a copy must be kept on the site of the work until the completion of the project.
105.9 Responsibility. Every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, must comply with the codes.
105.10 Preliminary inspection. Before issuing a permit, the Building Official is authorized to examine or cause to be examined buildings, structures and sites for which an application has been filed.
105.11 Change of contractor or of ownership. A valid permit terminates upon a change of ownership or a change of contractor regarding the building, structure or grading for which said permit was issued if the work is not complete. A new permit is required for the completion of the work. Permit and applicable fees, must be paid to the City before the Building Official issues a new permit. If, however, changes have been made to the plans and specifications last submitted to the Building Official, a permit fee based upon the proposed changes may be levied.
-13-
City of Bellflower
Ordinance No. 1450
105.12 Incomplete construction. When a permit is revoked pursuant to Section 105.7 or abandoned pursuant to Section 105.6, the incomplete construction for which the permit is issued constitute a public nuisance and must be appropriately abated as in accordance with the procedure set forth in Chapter 8.36.
105.13 Surrender of permit. If a portion of the work or construction covered by the issued permit has not been commenced, the permittee may deliver such permit and approved documents to the Building Official with request that such permit is to be canceled. The Building Official will make note on the permit with or with like wording “Canceled at the request of the Permittee.” Thereupon the permit and documents become void. 105.14 Liens to be discharged. A permit cannot be issued to any person or corporation under the provision of this Title where the cost of any building repair or abatement was performed and a lien is recorded by the City, until the amount of such lien with interestis paid to the City in full.
F. Chapter 1, Division II (Scope and Administration), Section 107.1, 107.2, 107.32, 107.3.3, 107.3.4.1, and 107.5 are amended as foliows:
SECTION 107 — CONSTRUCTION DOCUMENTS
107.1 General. Construction documents, statement of special inspections, geotechnical reports and other data must be submitted in three or more sets, or in a digital formal where allowed by the Building Official, with each permit application. The construction documents must be prepared by a registered design professional where required by the statutes of the City in which the project is to be constructed. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional.
Exception: The Building Official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if the Building Official finds that the nature of the work applied for is such that review of construction documents is not necessary to obtain compliance with the codes. 107.2 Information on construction documents. Construction documents must be dimensioned and drawn upon suitable material. Electronic media documents are permit- ted to be submitted when approved by the Building Official. Construction documents must be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of the codes and relevant laws, ordinances, rules and regulations, as determined by the Building Official. 107.3.2 Previous approvals. The codes cannot require changes in the construction documents, construction or designated occupancy of a structure for which a lawful permit was previousiy issued or otherwise lawfully authorized, and the construction of which was pursued in good faith within 180 days after the effective date of the codes, has not been abandoned or the Building Official has not determined the permit was issued under false information.
-14-
City of Bellflower
Ordinance No. 1450
107.3.3 Phased approval. The Building Official is authorized to issue a permit for the construction of foundations or any other part of a building or structure before the construction documents for the whole building or structure have been submitted, provided that adequate information and detailed statements are filed complying with pertinent requirements of the codes and the BMC. The holder of such permit for the foundation or other parts of a building or structure must proceed at the holder's own risk with the building operation and without assurance that a permit for the entire structure will be granted. 107.3.4.1 Deferred submittals. For the purposes of this section, deferred submittals are defined as those portions of the design that are not submitted at the time of the application and that are to be submitted to the Building Official within a specified period.
Deferral of any submittal items must have the prior approval of the Building Official. The registered design professional in responsible charge must list the deferred submittals on the construction documents for review by the Building Official.
Documents for deferred submittal items must be submitted to the registered design professional in responsible charge who must review them and fonNard them to the Building Official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building.
The deferred submittal items must not be installed until the design and submittal documents have been approved by the Building Official.
107.5 Retention of construction documents. One set of approved construction documents must be retained by the Building Official for a period of not less than that required by applicable law and the City’s retention policy.
G. Chapter 1, Division II (Scope and Administration), Section 107.6 — Self- Certification Program, is added as follows:
107.6 Self-Certification Program.
1. Purpose. To expedite building permit approvals by allowing Licensed Design Professionals to voluntarily self-certify building plans.
2. Definitions. Unless the contrary is stated or clearly appears from the context, the following definitions will govern the construction of the words and phrases used in this section:
(a) “Self-certification,” “self-certify” or “self-certified” means the submission to the Building Official (i) is made by a Licensed Design Professional identified in the building permit application; (ii) accompanies plans filed with Building Division by that Licensed Design Professional; and (iii) that Licensed Design Professional attests such plans (1) do not contain any false information, (2) are in compliance with requirements of the applicable State and City of Bellflower laws, codes, and regulations, and (3) were prepared by or under the direct supervision of, and signed and stamped by, that Licensed Design Professional.
City of Bellflower
Ordinance No. 1450
(b) “Licensed Design Professional" means the California Licensed Architect or Engineer, as applicable, identified as such on the building permit application and accompanying plans.
3. Eligible Participants. In order to participate in the Program, applicants must be registered and be in good standing as a Licensed Design Professional with the State of California.
4. insurance Requirements. For a project to be accepted for Self-Certification, the Licensed Design Professional is required to furnish the Building Official a Certificate of Professional Liability Insurance, issued by an insurer authorized to insure in the State of California. The amount of required coverage will be reasonably determined by the City Manager or his designee; typically, a minimum of $1,000,000, but not less than the valuation of the permitted project.
5. Optional Prescreening Process. The Licensed Design‘Professional who intends on filing an application with a Self-Certification may meet with the Building Official, or designee, for a courtesy prescreening of the proposed project to ensure the submittal is complete.
6. Submittal Requirements. The Licensed Design Professional who intends on filing an application with a Self-Certification must submit that application to participate in the program to the Building Official. Self-certified plans must contain all the information listed in the corresponding City of Bellflower handout regarding building design criteria. A Self- Certification form and a “hold harmless" letter, in a form approved by the city attorney, must be completed in its entirety and submitted for each project by the design team and the property owner. The Self-Certification program will be all inclusive, all construction trade work that requires permits for the project must be Self-Certified. Each page of the plans submitted, must be wet stamped and signed by a Licensed Design Professional for each applicable trade.
7. Non-Building Division Approvals. The Licensed Design Professional who intends on filing an application with a Self-Certification must provide documentation to the Building Official demonstrating final approvals of any applicable City Divisions/Departments, such as Planning, Public Works, and Engineering before permit issuance. That licensed design professional must also provide documentation to the Building Official appropriate approvals of any applicable “outside” agency. Those outside agencies include, without limitation, the following: Los Angeles County Health Department, school districts, Air Quality Management Districts, and Los Angeles County Sanitation District.
8. Fees: All fees set forth in the City’s Comprehensive Fee Schedule apply.
9. Permit Issuance. Applications that have met all the criteria of this voluntary Self-Certification program will be issued a building permit the same day of completed and approved application submittal.
-15-
City of Bellflower
Ordinance No. 1450
10.lnspection Protocol. All code-required State of California or City of Bellfiower inspections are required.
11.Audits. All Self-Certified plans are subject to auditing by the Building Official to determine whether plans comply with the applicable State and City of Bellfiower laws, codes, rules, and regulations. If plans are found to be in non-compliance, then the Licensed Design Professional who intends on filing an application with a Self-Certification will ensure compliance. If compliance is not obtained within a reasonable amount of time, then the Building Official may report the non-compliance items to the appropriate licensing board with the State of California.
H. Chapter 1, Division II (Scope and Administration), Section 108 - Temporary Structures and Uses, is amended as follows:
SECTION 108 — TEMPORARY STRUCTURES AND USES
108.1 General. The Building Official is authorized to issue a permit for temporary structures, equipment or systems and temporary uses. Such permits must be limited as to time of service but cannot be permitted for more than 12 months. The Building Official is authorized to grant extensions for demonstrated good cause. 108.2 Conformance. Temporary structures and uses must conform to the structural strength, fire safety, means of egress, accessibility, light, ventilation and sanitary requirements of the codes as necessary to ensure public health, safety and general welfare.
108.3 Temporary power. The Building Official is authorized to give permission to temporarily supply and use power in part of an electric installation before such installation has been fully completed and the final certificate of completion has been issued. The part covered by the temporary certificate must comply with the requirements specified for temporary lighting, heat or power in the California Electrical Code. 108.4 Termination of approval. The Building Official is authorized to terminate such permit for a temporary structure or use and to order the temporary structure or use to be discontinued.
l. Chapter 1, Division II (Scope and Administration), Section 109 - Fees, is amended as follows:
SECTION 109 — FEES
109.1 General. A fee as established by resolution of the City Council must be paid for each plan review when submitted and each permit at time of issuance. 109.2 Permit fees. A fee for each required permit must be assessed in accordance with the fee schedule adopted by City Council resolution.
-17-
City of Bellflower
Ordinance No. 1450
Failure to pay fees and obtain a permit before commencing work is a misdemeanor, except when a program is established by the Building Official and permit conditions are defined, or it can be proven to the satisfaction of the Building Official that an emergency existed which made it impractical to first obtain the permit. A violation will result in an assessment of an investigation fee in an amount equal to the permit fee for the work undertaken without permit. Payment of a double fee does not relieve any person from fully complying with the requirements of the codes nor from any other penalties prescribed herein.
109.3 Permit valuations. The applicant for a permit must provide an estimated permit value at time of application. Permit valuations must reflect the total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. if, in the opinion of the building official, the valuation is underestimated on the application, the permit will be denied, unless the applicant can show detailed estimates to meet the approval of the Building Official. Final building permit valuation is set by the Building Official. 109.4 Plan review fees. When a plan or other data is ready to be submitted in accordance with Section 105.3, a plan-checking fee, in the amount as established by City Council must be paid to the Building Official at the time of submitting plans and specifications for checking. When submittal documents are incomplete or include changes so as to require additional plan review or when the project involves differed submittal items an additional fee must be assessed in accordance with the fee schedule established by City Council.
Plan deficiencies identified in the initial plan review that are not resolved by the third review shall render the plan submittal incomplete and additional fees shall be assessed. 109.5 Investigation fee. An investigation fee as established by Section 109.2 may be charged by the Building Official whenever work for which a permit is required by the codes has been commenced without first obtaining a permit. This fee must be paid and the investigation must be made before the issuance of any permit for said work. An investigation fee may be charged for any investigation of a building, structure, work reports, certification or any other related work requested by an owner or authorized agent of such owner.
109.6 Fee Refunds. In the event that an applicant has submitted for plan review or obtained a permit and no portion of the review, work, or construction covered by such permit has been commenced, and such permit is cancelled, the applicant may submit a written request to the Building Official requesting a refund of permit fees. The request must be submitted within one year of the date of cancellation or expiration of the permit.
The Building Official may refund all or a portion of the permit fees to the applicant except that no portion of any permit issuance fee or other administrative fee shall be refunded. 109.7 Change of Occupancy Investigation fee. A fee as established by City Council resolution must be paid when an occupancy investigation inspection is required by the Building Official. Note: The occupancy investigation fees are in addition to other investigation fees and do not include the fees for the building permit, or fees for electrical, plumbing or mechanical permits covering the alterations and/or repairs of the occupancy conversion.
-18-
City of Bellflower
Ordinance No. 1450
J. Chapter 1, Division II (Scope and Administration), Section 111 — Certificate of Occupancy, is amended as follows:
SECTION 111 — CERTIFICATE OF OCCUPANCY
111.1 Use and occupancy. No building or structure can be used or occupied in whole or in part, and no change in the existing use or occupancy classification of a building or structure or portion thereof can be made until the Building Official issues a certificate of occupancy. The Building Official cannot issue a Certificate of Occupancy to the builder upon the completion of a commercial structure where there is tenant space. Instead, a Certificate of Occupancy is issued to a business entity that is going to occupy the building or a portion thereof. issuing a certificate of occupancy is not an approval of a violation of the provisions of the codes or other ordinances of the City.
Exception: The Building Official may not issue Certificate of Occupancies for single and duplex residential dwelling units and owner-occupied dwelling units, such as townhomes, condominiums and U occupancies. Certificates of occupancy are not required for work exempt from permits in accordance with Section 105.2.
111.2 Time limitation of application. An application for a certificate of occupancy is deemed abandoned one year after the date of filing, unless such application has been pursued in good faith or a certificate of occupancy has been issued. 111.3 Certificate issued. After the Building Official inspects the building or structure and finds no violations of the provisions of the codes or other laws that are enforced by the City, the Building Official must issue a certificate of occupancy that contains the following:
1. The building permit number.
2. The address of the structure.
3. The name and address of the owner.
4. A description of that portion of the structure for which the certificate is issued.
5. A statement that the described portion of the structure has been inspected for compliance with the requirements of the codes for the occupancy and division of occupancy and the use for which the proposed occupancy is classified.
6. The name of the Building Official.
7. The edition of the code under which the permit was issued.
8. The use and occupancy, in accordance with the provisions of Chapter 3.
9. The type of construction as defined in Chapter 6.
-19-
City of Bellflower
Ordinance No. 1450
10.The design occupant load.
11.lf an automatic sprinkler system is provided, whether the sprinkler system is required.
12.Any special stipulations and conditions of the building permit. 111.4 Temporary occupancy. The Building Official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions must be occupied safely. The Building Official must set a time period during which the temporary certificate of occupancy is valid.
In the event the building is not completed and ready for final inspection in the time prescribed by the Building Official, the building must be vacated and the utilities disconnected until such time the building is completed, final inspection is completed and a Certificate of Occupancy is issued.
111.5 Revocation. The Building Official is authorized to, in writing, suspend or revoke a certificate of occupancy or completion issued under the provisions of the codes, in writing, wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation or any of the provisions of the codes.
K. Chapter 1, Division II (Scope and Administration), Section 112 — Service Utilities, is amended as follows:
SECTION 112 — SERVICE UTILITIES
112.1 Connection of service utilities. Connections from a utility, source of energy, fuel or power, or a water system or sewer system to any building or system that is regulated by the codes for which a permit is required, must not be established until released by the Building Official.
112.2 Temporary connection. The Building Official may authorize the temporary connection of the building or system to the utility, the source of energy, fuel or power, or the water system or sewer system for the purpose of testing systems or for use under a temporary approval. .
Temporary connections may be terminated by the Building Official in the event the permit for such work expires, temporary occupancy is terminated, or it is determined by the Building Official that conditions associated with the connected utility are not met. 112.3 Authority to disconnect service utilities. The Building Official may cause or order the disconnection or discontinuance of utility service to a building, structure, premises, system, equipment, fixture, or device that is regulated by this Code or by the referenced codes and standards set forth in Section 101.4, or elsewhere in the BMC: (i) when necessary to eliminate or mitigate an immediate hazard to life, health, safety, or property; (ii) when such building, structure, system, equipment, fixture, or device, or any utility service thereto, has been installed, equipped, altered, or used without requisite approvals, permits, or inspections; or (iii) when such building, structure. premises, system, equipment, fixture or device is found to be an unlicensed cannabis facility. An “unlicensed cannabis facility” means any facility within the City conducting commercial cannabis activity without a permit issued in accordance with the BMC. -20-
City of Bellflower
Ordinance No. 1450
The Building Official must attempt to notify the sewing utility, and wherever possible the owner or the owner’s authorized agent and occupant of the building, structure, premises, system, equipment, fixture, or device, of the decision to disconnect before taking such action; provided that the Building Official may dispense with any attempt at prior notification if, in the sole discretion of the Building Official, the nature or severity of the hazard justifies such inaction. if not notified before disconnecting, the Building Official must notify the owner of the owner’s authorized agent or occupant of the building, structure, premises, system, equipment, fixture, or device in writing of the disconnection as soon as practical thereafter.
The utility service must remain disconnected or discontinued until the Building Official releases the utility service. The Building Official cannot release the utility service until: (i) the imminent hazard has been abated or eliminated; or (ii) all requisite approvals, permits, and inspections have been obtained for the building, structure, system, equipment, fixture, or device, or any utility service thereto.
L. Chapter 1, Division II (Scope and Administration), Section 112 — Means of Appeals, is amended as follows:
SECTION 113 - BOARD OF APPEALS — CITY COUNCIL
113.1 General. The City Council is designated to hear and decide appeals of orders, decisions or determinations made by the Building Official relative to the application and interpretation of this code. All references to the “Board of Appeals" means the City Council.
113.2 Limitations on authority. The Board of Appeals does not have authority to interpret the administrative provisions of the codes, nor is the Board empowered to waive requirements of the codes. The application for appeal must be based on a claim that the true intent of the codes or the rules legally adopted thereunder was incorrectly interpreted where the provision of the codes do not fully apply, or where an equally good or better form of construction is proposed.
113.3 Applications, fees and findings. Any person appealing the decision of the Building Official must file with the Building Official a written application accompanied by a filing fee in accordance with the fee schedule adopted by City Council resolution at any time not more than 20 calendar days after the decision of the Building Officiat.
The application must set forth and include any information the Building Official may require.
Upon the filing of a verified application, the Building Official must transmit said application forthwith to the Board of Appeals, and such Board must investigate, examine, review, hear testimony, from and on behalf of the applicant, and render findings and decisions on the matter in writing to the applicant with a duplicate copy to the Building Official within 20 days after the conclusion of its proceedings, the Building Official must make all findings and decisions available to the public without fees.
-21-
City of Bellflower
Ordinance No. 1450
M. Chapter 1, Division II (Scope and Administration), Section 114 — Violations, is amended as follows:
SECTION 114 —VIOLATIONS AND PENALTIES
114.1 General. Violation of the codes constitutes a misdemeanor. In addition, such violation constitutes a public nuisance subject to abatement in accordance with applicable law.
114.2 Notice of violation. The Building Official is authorized to serve a notice of violation or order on the person responsible for the erection, construction, alteration, extension, repair, moving, removal, demolition or occupancy of a building or structure in violation of the provisions of the codes, or in violation of a permit or certificate issued under the provisions of the codes. Such order must direct the discontinuance of the illegal action or condition and the abatement of the violation.
114.3 Compliance with Notice and prosecution of violation. if the notice of violation is not complied with promptly, the Building Official is authorized to request the City Attorney to institute the appropriate proceeding at law or in equity to restrain, correct or abate such violation, or to require the removal or termination of the unlawful occupancy of the building or structure in violation of the provisions of the codes or of the order or direction made pursuant thereto. No person may remain in or enter any building or structure that has been posted with a red tag by the Building Official. Notwithstanding the foregoing, a person may enter the building or structure to repair, demolish or remove such building or structure pursuant to a duly issued permit. No person may remove or deface any order issued by the Building Official including, without limitation, a red tag, after it is posted until the required repairs, demolition or removal have been completed and a certificate of occupancy has been issued, where applicable. 114.4 Violation penalties. Any person who violates a provision of the codes or fails to comply with any of the requirements thereof or who erects, constructs, alters or repairs a building or structure in violation of the approved construction documents or directive of the Building Official, or of a permit or certificate issued under the provisions of the codes, is subjected to penalties as prescribed by law.
N. Chapter 1, Division II (Scope and Administration), the title of Section 116 — Unsafe Structures and Equipment, is amended as follows:
SECTION 116 — UNSAFE STRUCTURES AND BUILDINGS
0. Chapter 1, Division II (Scope and Administration), Sections 116.1, 116.2,116.3 are amended as follows:
116.1 General. All buildings, structures or existing equipment that are or hereafter become unsafe, insanitary or deficient because of inadequate means of egress facilities, inadequate light and ventilation, or which constitute a fire hazard, or are otherwise dangerous to human life or the public welfare, or that involve illegal or improper occupancy or inadequate maintenance, are, for the purpose of this section, unsafe conditions. All such unsafe buildings or conditions are public nuisances and must be abated by repair, rehabilitation, improvement, removal, or demolition, in whole or part.
A vacant building or structure that is not secure against entry is deemed “unsafe.” -22-
City of Bellflower
Ordinance No. 1450
116.2 Placards and orders relating to occupancy of unsafe structures and buildings. Pursuant to the completion of a visual, nondestructive examination to determine the condition for continued occupancy, the Building Official or designee is authorized to designate the condition of the unsafe building or structure with a placard or order, as follows:
1. A “stop work” order means an order requiring the immediate cessation of all work being done contrary to the provisions of Title 15 or other pertinent laws or ordinances implemented through the enforcement of this Code, or which results in a dangerous, hazardous or unsafe condition. Persons notified of this order must immediately stop such work until otherwise authorized by the Building Official or designee.
2. A “limited access” order or “yellow tag” denotes restricted use and is to be posted on each building or structure that has been damaged wherein the damage has resulted in some form of restriction to the continued occupancy. The individual who posts this placard will note in general terms the type of damage encountered and will clearly note the restrictions on continued occupancy.
3. A “do not enter - unsafe to occupy” order or “red tag” denotes that the building or structure is so damaged that continued occupancy poses a threat to life safety. Buildings or structures posted with this placard may not be entered under any circumstance except as authorized in writing by the building official or designee. Safety assessment teams are authorized to enter these buildings at any time. This placard is not to be used or considered as a demolition order. The individual who posts this placard will note in general terms the type of damage encountered.
The appropriate placard must be posted at each entry point to a building or structure.
Once it has been attached to a building or structure, a placard is not to be removed, altered or covered until done so by an authorized representative of the building official. It is unlawful for any person, firm or corporation to alter, cover or deface a placard pursuant to this section.
116.3 Notice. If an unsafe condition is found, the Building Official must serve on the owner, agent or person in control of the structure, a written notice that describes the condition deemed unsafe and specifies the required repairs or improvements to be made to abate the unsafe condition, or that requires the unsafe structure to be demolished within a reasonable time. Such notice will be deemed properly served when made in conjunction with section 1.04.080 of the Bellflower Municipal Code.
P. Chapter 1, Division II (Scope and Administration), Section 117 — Construction Hours of Operation, is added as follows:
-23-
City of Bellflower
Ordinance No. 1450
SECTION 117 CONSTRUCTION HOURS OF OPERATION
117.1 Hours of Construction. No construction activities may commence within the City of Bellflower except as set forth in Table 118.1 below or as otherwise approved by the Building Official:
Table 117.1 Construction Hours of Operations
Start Time End Time
7:00 am. 6:00
8:00 am. 6:00
and Not Permitted Not Permitted
For purposes of this Section, construction includes, without limitation, site preparation, demolition, grading, excavation, and the erection, improvement, remodeling, or repair of buildings or structures, including operation of equipment or machinery and the delivery of material associated with those activities, irrespective of whether a building permit is required for the construction.”
Q. Table 1505.1 is hereby amended, by the deletion of Table 1505.1 and the addition of a new Table 1505.1 thereto, to read as follows:
TABLE 1505.1a
MINIMUM ROOF COVERING CLASSIFICATIONS
TYPES OF CONSTRUCTION
IA IB IIA IIB IIIA IIIB IV VA VB
B B B B B B B B B
For Si: 1 foot = 304.8 mm, 1 square foot = 0.0929 m2.
a. Unless otherwise required in accordance with Chapter 7A.
R. Section 150512 is hereby amended, by the deletion of the entire section and the addition of a new section thereto, to read as follows:
1505.1.2 Roof coverings within all other areas. The entire roof covering of every existing structure where more than 50 percent of the total roof area is replaced within any one-year period, the entire roof covering of every new structure, and any roof covering applied in the alteration, repair or replacement of the roof of every existing structure, shall be a fire-retardant roof covering that is at least Class B.
SECTION 4. BMC Chapter 15.08 is amended in its entirety to read as follows:
“Chapter 15.08 ELECTRICAL CODE
15.08.010 Electrical Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 3 (the 2025 California Electrical Code) is adopted by reference as the Electrical Code of the City of Bellflower. .24-
City of Bellflower
Ordinance No. 1450
In accordance with Government Code § 50022.6, one copy of the 2025 California Electrical Code must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.08.020 Amendments.
A. Article 91 is added to read as follows:
Article 91
Administrative Provisions
For administrative provisions for this Code, see § 1504.040.” SECTION 5. BMC Chapter 15.12 is amended in its entirety to read as follows:
“Chapter 15.12 PLUMBING CODE
15.12.010 Plumbing Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 5 (the 2025 California Plumbing Code) with amendments and including Appendices A, B, C, D, E, G, I, K, and L is adopted by reference as the Plumbing Code of the City of Beilfiower.
In accordance with Government Code § 50022.6, one copy of the 2025 California Plumbing Code must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.12.020 Amendments.
A. Chapter 1 Division II is amended in its entirety to read as follows:
Chapter1 Division II
Administrative Provisions
For administrative provisions for this Code, see § 1504.040." SECTION 6. BMC Chapter 15.16 is amended in its entirety to read as follows:
“Chapter 15.16 MECHANICAL CODE
15.16.010 Mechanical Code - Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 4 (the 2025 California Mechanical Code) with amendments and including Appendices C, D, E, and F is adopted by reference as the Mechanical Code of the City of Bellflower.
-25-
City of Bellflower
Ordinance No. 1450
In accordance with Government Code § 50022.6, one copy of the 2025 California Mechanical Code must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.16.020 Amendments.
A. The text within Chapter 1 Division II is amended to read as follows:
Chapter 1 Division II
Administrative Provisions
For administrative provisions for this Code, see § 1504.040.” SECTION 7. BMC Chapter 15.40 is amended in its entirety to read as follows:
“Chapter 15.40 FIRE CODE
15.40.010 Fire Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 9 (the 2025 California Fire Code) with amendments, including Section 503and Appendices Chapter 4, B, C, D, H, I, M, and O is adopted by reference as the Fire Code of the City of Bellflower.
In accordance with Government Code § 50022.6, one copy of the chapters and appendices must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
Only the Bellflower Building Official is authorized to exercise the authority in CBSC § 105.4 including, without limitation, issuing building permits.
15.40.020 Amendments.
A. Section 111, including its subparts, is amended to read as follows:
SECTION 111 - BOARD OF APPEALS — CITY COUNCIL
111.1 General. The City Council is designated to hear and decide appeals of orders, decisions or determinations made by the Fire Code Official relative to the application and interpretation of this Division. All references to the “Board of Appeals” means the City Council.
111.2 Limitations on authority. An application for appeal will be based on a claim that the intent of this code or the rules legally adopted hereunder have been incorrectly interpreted, the provisions of this code do not fully apply, or an equivalent method of protection or safety is proposed. The Board does not have the authority to waive the requirements of this code.
City of Bellflower
Ordinance No. 1450
111.3 Applications, fees and findings. Any person appealing the decision of the Fire Code Official must file with the Building Official a written application accompanied by a filing fee in accordance with the fee schedule adopted by City Council resolution at any time not more than 20 calendar days after the decision of the Fire Code Official.
The application must set forth and include any information the Building Official may require.
Upon the filing of a verified application, the Building Official must transmit said application forthwith to the Board of Appeals, and such Board must investigate, examine, review, hear testimony, from and on behalf of the applicant, and render findings and decisions on the matter in writing to the applicant with a duplicate copy to the Building Official within 20 days after the conclusion of its proceedings, the Building Official must make all findings and decisions available to the public without fees.
B. Section 202 is amended by revising the following definitions:
FIRE CHIEF. The City Manager for the City of Bellflower, or designee. Unless otherwise determined by the City Manager, the Fire Chief for the Consolidated Fire Protection District of Los Angeles County ("Fire District") may enforce this chapter as the "Fire Chief" and "Fire Official" for purposes of California Fire Code ("CFC") Section 202. Any such enforcement authority must be exercised in cooperation with the City Manager or designee(s)-to ensure a uniform enforcement of applicable law within the city's jurisdiction.
FIRE CODE OFFICIAL. "Fire Code Official" means the "Building Official." SECTION 8. BMC Chapter 15.56 is amended in its entirety to read as follows:
“Chapter 15.56 ENERGY CODE
15.56.010 Energy Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 6 (the 2025 California Energy Code) with amendments and including Appendices 1A and 1B is adopted by reference as the Energy Code of the City of Bellflower.
In accordance with Government Code § 50022.6, one copy of the 2025 California Energy Code must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.56.020 Amendments.
A. Section 100.2 is added to Subchapter 1 to read as follows:
-27-
City of Bellflower
Ordinance No. 1450
Section 100.2
Administrative Provisions
For administrative provisions for this Code, see § 1504.040.” SECTION 9. BMC Chapter 15.60 is amended in its entirety to read as follows:
“Chapter 15.60 RESIDENTIAL CODE
15.60.010 Residential Code — Adopted by Reference; Where Filed.
Chapter 1 Division II and Chapters 2 through 10, and 44 of California Code of Regulations Title 24, Part 2.5 (the 2025 California Residential Code) are adopted by reference as the Residential Code of the City of Bellflower.
in accordance with Government Code § 50022.6, one copy of the chapters and appendices must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.60.020 Administrative Provisions.
A. The text within Chapter 1 Division ii is amended to read as follows:
Chapter 1 Division II
Administrative Provisions
For administrative provisions for this Code, see § 1504.040.” 1560.030 Design Criteria
A. Table R301 .2(1) is amended, by deleting Table R301.2(1) and replacing it _ with a new Table R301 2.(1), to read as follows
gTABLE R301.2(1)
iCLiMATlC AND GEOGRAPHIC DESIGN CRITERIA ;. -‘ .. -
Ground
Load. " WIND DESIGN i . ": ‘ “SUBJECTTODAMAGE FROM ' V .
Wind ' ' g , ' » Barrier . ' -, ’ 2' .
Topo- Special home Seismic _ Frost Winter Under- - Air - Mean 1 Speed graphic Wind. debris Design Weathering ling Design Layment Flood Freezing Annual mph. m Region zone. Category. ' , 1 Depth Termite. Temp. Req'ulred'. Hazards, index. Temp, f Zero 95 Exposure Yes No Dz orE Negligible 12-24" Very 40 No Yes 0 63 Heavy B
-28-
City of Bellflower
Ordinance No. 1450
7 (50% RH)
l For SI: 1 pound per square foot = 0.0479 kI-‘a, 1 mile per hour - 0.447 m/s.
1. Where weathering requires a higher strength concrete or grade of masonry than necessary to satisfy the structural requirements of this code, the frost line depth strength required for weathering shall govern. The weathering column shall be filled in with the weathering index, “negligible,” “moderate” or “some" for concrete as determined from Figure R30l.2(l). The grade of masonry units shall be determined from ASTM C34, ASTM C55, ASTM C62, ASTM C73, ASTM C90, ASTM 0129. ASTM C145, ASTM C216 or ASTM C652. b. Where the frost line depth requires deeper footings than indicated in Figure R403.l(1), the host line depth strength required for weathu-ing shall govern. Thejurisdiction shall fill in the frost line depth column with the minimum depth of footing below finish grade. c. The jurisdiction shall fill' in this part of the table to indicate the need for protection depending on whetha there has been a history of local subterranean termite damage. d. Thejuiisdiction shall fill in this part of the table with the wind speed from the ultimate design wind speeds map [Figure R301. 2(2)]. Wind exposure category shall be dmrmined on a site- specificbasis' in accordancewith SectionR301.2.l4.
e. The junsdicnon shall fill in this section of the table to establish the design criteria using Table 10A fromACCA Manual I or established criteria dewrmined by the jurisdiction. f. The jurisdiction shall fill in this part of the table with the seismic design category determined from Section R301.2.2.1. g. The jurisdiction shall fill in this part of the table with: the date of the jurisdiction‘s entry into the National Flood Insurance Program (date of adoption of the first code or ordinance for management of floodhazard areas); and the title and date of the currently efi‘eotive Flood Insurance Study or other floodhmrd study and maps adopwd by the authority having jurisdiction, as amended
h. In accordance with Sections R905.1.2, R905.-1.3.1. R905.5.3.l, R905.6.3.l, R905.7.3.1 and R905.8.3.l, where there has been a history of local damage from the efi'ects of ice damning. the jurisdiction shall fill in this part ofthe table with “YES.” Otherwise, the jurisdiction shall fill in this part of the table with “N0.” i. The jurisdiction shall fill in this part of the table with the loo-year return period air freeing index (BF-days) from Figure R403.3(2) or from the 100~year (99 percent) value on the National Climatic Data Center data table “Air Freezing Index- USA Method (Base 32°F)“ j. The jurisdiction shall fill' in this part of the table with the mean annual temperature from the National Climatic Data Center data table “Air Freaing lndex- USA Method (Base 32°F). " k. In accordance with Section R301.2.1.5, where there' is local historical data ‘ ' structural g to ‘ "" ,due to , ‘L' wind speed-up effects, the jurisdiction shall fill' in this part of the table with “YES.’ Otherwise, the jurisdiction shall indicate ‘NO” in this part of the table. i. In accordance with Figure 1801.20), where there is local historical data documenting unusual wind conditions, the jurisdiction shall fill in this part of the table with “YES" and identify any specific requirements. Otherwise, the jurisdiction shall indicate “NO” in this part of the table. m.In accordance with Section R3012. 1.2 the jurisdiction shall indicate the wind-home debris wind zonc(s). Otherwise, the jurisdiction shall indicate “NO" in this part of the table. it. The jurisdiction shall fill in these sections of the table to establish the design criteria using Table la or lb from ACCA Manual J or established criteria determined by the jurisdiction.
0. The jurisdiction shall fill in this section of the allowable stress design table using the Groimd Snow Loads in Figure M0110).
15.60.040 Soil Tests
A. Section R401.4.1.1.5.1 is added to read as follows:
R401.4.1.1.5.1 A soils investigation report shall be provided for all projects exceeding 750 square feet or more than one story in height. Projects under 750 square feet may meet the necessary seismic hazard mitigation following the City of Bellflower Seismic Hazard Mitigation handout.
B. Section R9021 is amended, by deleting the entire section and adding a new section, to read as follows:
R902.1 Roofing covering materials. Roofs must be covered with materials as set forth in Sections R904 and R905. A minimum Class A or B roofing must be installed in areas designated by this section. Classes A and B roofing required by this section to be listed must be tested in accordance with UL 790 or ASTM E 108.
Exceptions:
1. Class A roof assemblies include those with coverings of brick, masonry and exposed concrete roof deck.
2. Class A roof assemblies also include ferrous or copper shingles or sheets, metal sheets and shingles, clay or concrete roof tile, or slate installed on noncombustible decks or ferrous, copper or metal sheets installed without a roof deckon noncombustable framing.
-29-
City of Bellflower
Ordinance No. 1450
3. Class A roof assemblies include minimum 16 ounces per square foot (4.882 kg/m2) copper sheets installed over combustible decks.
4. Class A roof assemblies include slate installed over ASTM D226, Type II underlayment over combustible decks.
C. Section R902.1.2 is amended, by deleting the entire section and replacing it with a new section, to read as follows:
R902.1.2 Roof coverings within ali other areas. The entire roof covering of every existing structure where more than 50 percent of the total roof area is replaced within any one-year period, the entire roof covering of every new structure, and any roof covering applied in the alteration, repair or replacement of the roof of every existing structure, shall be a fire-retardant roof covering that is at least Class B.
SECTION 10. BMC Chapter 15.64 is amended in its entirety to read as follows:
“Chapter 15.64 GREEN BUILDING STANDARDS CODE
15.64.010 Green Building Standards Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 11 (the 2025 California Green Building Standards Code) is adopted by reference as the Green Building Standards Code of the City of Bellflower.
In accordance with Government Code § 50022.6, one copy of California Code of Regulations Title 24, Part 11 (2025 California Green Building Standards Code) must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.64.020 Administrative provisions.
A. The text within Chapter 1 is added to read as follows:
Chapter 1
Administrative Provisions
For administrative provisions for this Code, see § 1504.040.” SECTION 11. BMC Chapter 15.76 is added to read as follows:
“Chapter 15.76 EXISTING BUILDING CODE
15.76.010 Existing Building Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 10 (the 2025 California Existing Building Code) with amendments and including Appendices A, B, and C is adopted by reference as the Existing Building Code of the City of Bellflower.
City of Bellflower
Ordinance No. 1450
In accordance with Government Code § 50022.6, one copy of California Code of Regulations Title 24, Part 10 (2025 California Existing Building Code) must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.76.020 Amendments.
A. The text within Chapter 1 Division 2 is amended to read as follows:
Chapter 1 Part 2
Administrative Provisions
For administrative provisions for this Code, see § 1504.040." SECTION 12. BMC Chapter 15.80 is added to read as follows:
“Chapter 15.80 REFERENCED STANDARDS CODE
15.80.010 Referenced Standards Code — Adopted by Refence; Where Filed.
California Code of Regulations Title 24, Part 12 (the 2025 California Referenced Standards Code) is adopted by reference as the Referenced Standards Code of the City of Bellflower.
In accordance with Government Code § 50022.6, one copy of California Code of Regulations Title 24, Part 12 (2025 California Referenced Standards Code) must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.” SECTION 13. BMC Chapter 15.84 is added to read as follows:
“Chapter 15.84 WILDLAND-URBAN INTERFACE CODE
15.84.010 Wildland-Urban Interface Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 7 (the 2025 California Wildland-Urban Interface Code) is adopted by reference as the Wildland-Urban Interface Code of the City of Bellflower.
In accordance with California Government Code § 50022.6, one (1) copy of California Code of Regulations Title 24, Part 7 (2025 California Wildland-Urban Interface Code) must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public. 1 5.84.020 Amendments.
A. The text within Chapter 1 Division 2, Section 103 through 113 is amended to read as follows:
-31-
City of Bellflower
Ordinance No. 1450
Chapter 1 Part 2
Administrative Provisions Section 103-113
For administrative provisions of Section 103-113 for this Code, see § 15.04.040.” SECTION 14. Construction. This Ordinance must be broadly construed in order to achieve the purposes stated in this Ordinance. It is the City Council’s intent that the provisions of this Ordinance be interpreted or implemented by the City and others in a manner that facilitates the purposes set forth in this Ordinance.
SECTION 15. Enforceability. Repeal of any provision of the Bellflower Municipal Code does not affect any penalty, forfeiture, or liability incurred before, or preclude prosecution and imposition of penalties for any violation occurring before this Ordinance’s effective date. Any such repealed part will remain in full force and effect for sustaining action or prosecuting violations occurring before the effective date of this Ordinance.
SECTION 16. Validity of Previous Code Sections. If this entire Ordinance or its application is deemed invalid by a court of competent jurisdiction, any repeal or amendment of the BMC or other city ordinance by this Ordinance will be rendered void and cause such previous BMC provision or other the city ordinance to remain in full force and effect for all purposes.
SECTION 17. Environmental Assessment. The City Council finds that adoption of this Ordinance is exempt from review under the California Environmental Quality Act (Public Resources Code §§ 21000, et seq., “CEQA”) and the regulations promulgated thereunder (14 California Code of Regulations §§ 15000, et seq., the “CEQA Guidelines") because it consists only of minor revisions and clarifications to an existing code of construction-related regulations and specification of procedures related thereto and will not have the effect of deleting or substantially changing any regulatory standards or findings required therefor, and therefore does not have the potential to cause significant effects on the environment. In addition, this ordinance is an action being taken for enhanced protection of the environment and is exempt from further review under CEQA Guidelines § 15308.
SECTION 18. Severability. If any part of this Ordinance or its application is deemed invalid by a court of competent jurisdiction, the city council intends that such invalidity will not affect the effectiveness of the remaining provisions or applications and, to this end, the provisions of this Ordinance are severable.
SECTION 19. Publication. The City Clerk is directed to certify the passage and adoption of this Ordinance; cause it to be entered into the City of Bellflower’s book of original ordinances; make a note of the passage and adoption in the records of this meeting; and, within 15 days after the passage and adoption of this Ordinance, cause it to be published or posted in accordance with California law. -32-
City of Bellflower
Ordinance No. 1450
SECTION 20. Effective Date. This Urgency Ordinance is adopted by a four-fifths vote for the immediate preservation of the public peace, health, safety and welfare and becomes effective immediately pursuant to Government Code § 36937(b).
The City Manager, or designee, may not apply the regulations adopted by this Ordinance until January 1, 2026. Applications filed with the City after that date must comply with this Ordinance. Project applications filed before December 31, 2025, are exempt from the regulations in this Ordinance if a building permit is issued not later than March 30, 2026.
Should, however, a building permit not be issued by that date or a validly issued building permit expire, all subsequent applications must comply with the regulations adopted by this Ordinance. This Section 20 takes precedence over any conflicting Section of Ordinance No. 1449.
SECTION 21. Filing with Building Standards Commission. The City Clerk must file a certified copy of this Ordinance with the California Building Standards Commission.
ORDINANCE NO. 1450 HAD ITS FIRST READING ON SEPTEMBER 3, 2025, ITS SECOND READING ON SEPTEMBER 22, 2025, AND WAS DULY PASSED,
APPROVED, AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF BELLFLOWER AT ITS REGULAR MEETING OF SEPTEMBER 22, 2025.
Ray Dunton, Mayor
ATTEST:
Mayra Ochiqui, City Clerk
APPROVED AS TO FORM:
Karl H. Berger, City Attorney
-33-
CITY OF BELLFLOWER
ORDINANCE NO. 1449
AN ORDINANCE ADOPTING THE 2025 EDITIONS OF THE CALIFORNIA
BUILDING CODE, THE CALIFORNIA RESIDENTIAL CODE, THE
CALIFORNIA ELECTRICAL CODE, THE CALIFORNIA MECHANICAL
CODE, THE CALIFORNIA PLUMBING CODE, THE CALIFORNIA ENERGY
CODE, THE CALIFORNIA FIRE CODE, THE CALIFORNIA EXISTING
BUILDING CODE, THE CALIFORNIA WILDLAND-URBAN INTERFACE
CODE, THE CALIFORNIA GREEN BUILDING STANDARDS CODE, THE
CALIFORNIA REFERENCED STANDARDS CODE, AND THE
CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE;
MAKING CERTAIN AMENDMENTS BASED UPON LOCAL CONDITIONS;
AND AMENDING THE BELLFLOWER MUNICIPAL CODE TO REFLECT
SUCH CHANGES
THE CITY COUNCIL DOES ORDAIN AS FOLLOWS:
SECTION 1. Findings. The City Council finds as follows:
A. The City may adopt model codes by reference pursuant to Government Code §§ 50022.2, et seq.;
Health and Safety Code § 17958 requires the City to adopt certain codes that are set forth in Health and Safety Code § 17922 and published in the California Code of Regulations;
In accordance with Health and Safety Code § 17958.7, it is in the public interest to adopt the most recent codes published by the California Building Standards Commission;
Notice of public hearing to consider this Ordinance was published pursuant to Government Code § 6066 and a duly noticed public hearing was held on September 22, 2025 regarding the adoption of this Ordinance; Pursuant to § 50022.6 of the Government Code, at least one copy of all codes adopted by reference in this Ordinance were filed with the City Clerk of the City and were available for public inspection for at least 15 days preceding the date of the hearing;
Pursuant to Government Code § 50022.9, the City Council intends to adopt by reference, with local amendments, the following 2025 codes in their entirety as if set forth in full herein (collectively, the “Uniform Codes”):
1. The California Building Code, 2025 Edition — Vol. I & II as published in Title 24, Part 2 of the California Code of Regulations;
2. The California Residential Code, 2025 Edition, as published in Title 24, Part 2.5 of the California Code of Regulations;
City of Bellflower
Ordinance No. 1449
3. The California Electrical Code, 2025 Edition, as published in Title 24, Part 3 of the California Code of Regulations;
4. The California Mechanical Code, 2025 Edition, as published in Title 24, Part 4 of the California Code of Regulations;
5. The California Plumbing Code, 2025 Edition, as published in Title 24, Part 5 of the California Code of Regulations;
6. The California Energy Code, 2025 Edition, as published in Title 24, Part 6 of the California Code of Regulations;
7. The California Wildland-Urban Interface Code, 2025 Edition, as published in Title 24, Part 7 of the California Code of Regulations;
8. The California Fire Code, 2025 Edition, as published in Title 24, Part 9 of the California Code of Regulations. in adopting the CFC, the City Council incorporates the findings set forth in Section 1 of Ordinance Nos. 1438 (adopted January 27, 2025) and 1439 (adopted February 10, 2025) as if fully set forth;
9. The California Existing Building Code, 2025 Edition, as published in Title 24, Part 10 of the California Code of Regulations;
10. The California Green Building Standards Code, 2025 Edition, as published in Title 24, Part 11 of the California Code of Regulations; and
11. The California Referenced Standards Code, 2025 Edition, as published at Title 24, Part 12, of the California Code of Regulations.
SECTION 2. In accordance with Health and Safety Code § 17958.7, the City Council finds that there are local climatic, geographic, and topographic conditions justifying the various local amendments to the Uniform Codes. The City Council finds and determines that certain building standards established by these Codes are inadequate for use and enforcement in the City of Bellflower because of unique geological conditions prevailing within the City. Such geological conditions affect the potential consequences of soil strength loss due to known liquefaction zones within the City and the nearby location of earthquake faults, resulting in the possibility of significant loss of life and structures within the City unless appropriate building standards are adopted. The lessons learned from previous earthquakes, such as the Northridge and Whittier earthquakes, were refined with studies and tests that have continued since the last Uniform Code adoption cycle. The results of these studies and tests necessitate adoption of further amendments to the structural requirements of the Uniform Codes. The proposed structural amendments are detailed in the sections of the Bellflower Municipal Code (“BMC”) adopted by this Ordinance. Additionally, the City of Bellflower is a densely populated area within a climate system capable of producing major winds, fire and rain related disasters including, without limitation, those caused by the Santa Ana winds and -35-
City of Bellflower
Ordinance No. 1449
El Nifio (or La Nifia) subtropical-like weather. This region is especially susceptible to more active termite and wood attacking insects and microorganisms. Los Angeles County and the City of Bellflower are located in a semi-arid Mediterranean type climate which predisposes all fuels, including wood shingles to rapid ignition and spread of fire.
Therefore, there exists a need for additional fire protection measures. Local amendments needed to mitigate these local conditions are also included with this Ordinance.
SECTION 3. BMC Chapter 15.04 is amended in its entirety to read as follows:
“Chapter 15.04 BUILDING CODE
15.04.010 Building Code — Adopted by Reference; Where filed.
Chapters 1 through 35, and Appendix Chapters B, F, G, H, l,. J, and P of California Code of Regulations Title 24, Parts 1 and 2 (the 2025 California Building Code) are adopted by reference as the Building Code of the City of Bellflower. in accordance with Government Code § 50022.6, one copy of the chapters and appendices must remain on file with the Building Official within the Planning Department and must be at all times maintained by the Building Official for use and examination by the public.
15.04.020 Definition of terms.
Unless the contrary is stated or clearly appears from the context, the following definitions govern the construction of the words and phrases used in this Title. Words and phrases not defined by this chapter have the meanings set forth in the applicable Code as set forth in Title 24 of the Code of California Regulations. if the definition of any term contained in this Title conflicts with the definition of the same term in the applicable Code, then the definition contained in this Title governs.
“Building and Safety Division” means the Planning Department’s Building Division for the City.
“Code” or “Codes” means the applicable 2025 code adopted by reference in this Chapter. “Health Office” means the Los Angeles County Department of Health Services.
15.04.030 Resolution of conflicts in application.
In the event of any conflict or ambiguity between any provision contained in the Codes and Title 15, Title 15 will govern.
15.04.040 Administrative Provisions and Amendments.
A. Chapter 1, Division II (Scope and Administration), Section 101 is amended as follows:
City of Bellflower
Ordinance No. 1449
SECTION 101 — TITLE, PURPOSE, INTENT AND SCOPE
B. Chapter 1, Division II (Scope and Administration), Sections 101.1, 101.2, 101.4, are amended and Sections 101.4.9 through 101.4.12 are hereby added to read as follows:
101.1 Title. These regulations may be referred to as the Administrative Provisions of the California Building Codes of the State of California and other Codes as adopted by Title 15 of the Bellflower Municipal Code.
101.2 Scope. The provisions of the codes apply to the construction, alteration, conversion, relocation, enlargement, improvement, replacement, repair, equipment, use and occupancy, location, maintenance, removal and demolition of every building or structure or any appurtenances connected or attached to such buildings or structures.
Exception: Detached one- and two-family dwellings and townhouses not more than three stories above grade plane in height with a separate means of egress, and their accessory structures not more than three stories above grade plane in height, must comply with the California Building Code or the California Residential Code. 101.4 Referenced codes. Codes listed in Sections 101.4.1 through 101.412 and referenced elsewhere in the codes are part of the requirements of the codes to the prescribed extent of each such reference.
101.4.9 Electrical Code. The California Electrical Code as adopted in BMC § 1508.010 applies to the installation and removal of electrical conductors, equipment, and raceways; signaling and communications conductors, equipment, and raceways; and optical fiber cables and raceways for the following: (1) Public and private premises, including buildings, structures, mobile homes, recreational vehicles, and floating buildings; (2) Yards, lots, parking lots, carnivals, and industrial substations; (3) Installations of conductors and equipment that connect to the supply of electricity; and (4) Installations used by the electric utility, such as office buildings, warehouses, garages, machine shops, and recreational buildings, that are not an integral part of a generating plant, substation, or control center.
101.4.10 Residential Code. The California Residential Code as adopted in BMC § 15.60.010 applies to the construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, removal and demolition of detached one- and two-family dwellings and townhouses not more than three stories above grade plane in height with a separate means of egress and their accessory structures not more than three stories above grade plane in height.
101.4.11 Green Building Standards Code. The mandatory provisions of the California Green Building Standards Code as adopted in BMC § 15.64.010 apply to the planning, design, operation, construction, use and occupancy of every newly constructed building or structure.
-37-
City of Bellflower
Ordinance No. 1449
101.4.12 Referenced Standards Code. The provisions of the California Referenced Standards Code as adopted in BMC § 15.80.010 apply to all buildings and structures.
C. Chapter 1, Division II (Scope and Administration), Section 102.6 is amended as follows:
102.6 Existing structures. The legal occupancy of any structure existing on the date of adoption of the codes may continue without change, except as is specifically covered in the codes or as is deemed necessary by the Building Official for the general safety and welfare of the occupants and the public.
D. Chapter 1, Division II (Scope and Administration), Section 103 — Code Compliance Agency, is amended as follows:
SECTION 103 — BUILDING AND SAFETY CODE COMPLIANCE
103.1 Creation of Agency. The Building and Safety Division is established as part of the Planning Department. Unless otherwise provided, the Building Official is authorized to implement, administer, and enforce the codes as adopted by this Title. 103.2 Appointment. The Building Official is appointed by the City Manager, or designee.
More than one Building Official may be appointed by the City Manager, or designee, at his or her discretion.
103.3 Deputies. In accordance with the prescribed procedures of this jurisdiction and with the concurrence of the City Manager, or designee, the Building Official may appoint a deputy Building Official, the related technical officers, inspectors, plan examiners and other agents. Such appointed agents have powers as delegated by the Building Official.
E. Chapter 1, Division II (Scope and Administration), Section 105 — Permits, is amended as follows:
SECTION 105 — PERMITS
105.1 Required. Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the codes, or to cause any such work to be done, must obtain a valid permit from the Building Official.
Work performed without a permit is a misdemeanor. In addition, any such work constitutes a public nuisance and may be abated in accordance with the BMC. 105.1.1 Time-based permit. In lieu of an individual permit for each alteration to an already approved electrical, gas, mechanical or plumbing installation, the Building Official is authorized to issue a permit, valid for a specific time period not exceeding one year, upon application therefore to any person, firm or corporation regularly employing one or -38-
City of Bellflower
Ordinance No. 1449
more qualified trade persons in the building, structure or on the premises owned or operated by the applicant for the permit.
105.1.2 Permit Records- The Building Official may detail the scope, parameters and conditions of this permit. The permit may be revoked when it is determined by the Building Official that the outlined scope, parameters, conditions or intent of the codes is not upheld by the permittee. The Building Official has access to such records at all times and such records must be filed with the Building Official as designated. 105.2 Work exempt from permit. Exemptions from permit requirements of the codes do not grant authorization for any work to be done in any manner in violation of the provisions of the codes or any other applicable law or policy. Except when otherwise subject to City review and approval or when otherwise required by applicable law, permits are not required for the following:
Building:
1. One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses not more than 10 feet in height, provided the floor area does not exceed 120 square feet and conforms to the zoning regulations of the BMC.
2. Chain-link, wrought-iron, wood and similar fences not over 6 feet high.
3. Concrete or masonry block walls not over 5 feet 11 inches in height and not required as part of the development process.
4. Retaining walls that are not over 4 feet in height measured from the bottom of the footing to the top of the wall and not required as part of the development process.
5. Light standards which do not exceed 15 feet in height.
6. Flagpoles not erected upon a building and not more than 15 feet in height.
7. A tree house provided that:
7.1 The tree house does not exceed 64 square feet in area or 8 feet in height from floor to roof.
7.2 The ceiling height as established by door height or plate line does not exceed 6 feet.
8. Oil derricks.
9. Water tanks supported directly on grade if the capacity does not exceed 5,000 gallons and the ratio of height to diameter or width is not greater than 2:1.
10. Sidewalks and driveways that are not more than 18 inches above adjacent grade, not over any basement or story below, not part of an accessible route and not part of a commercial site.
City of Bellflower
Ordinance No. 1449
11.Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work.
12.Temporary motion picture, television and theater stage sets and scenery.
13.Prefabricated swimming pools accessory to a Group R, Division 3 Occupancy in which the pool walls are entirely above the adjacent grade and the capacity does not exceed 5,000 gallons.
14.Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.
15.Swings and other playground equipment.
16.Canopies or awnings attached to a Group R or U Occupancy and extending not more than 54 inches from the exterior wall of the building.
17.Temporary sheds, office or storage buildings, and other structures incidental to and work authorized by a valid permit during construction activities. Such structures must be removed upon expiration of the permit or completion of the work covered by the permit.
18.Non-fixed and movable fixtures, cases, racks, counters and prefabricated partitions not over 5 feet 9 inches in height.
19.Steel tanks supported on a foundation not more than two feet (610 mm) above grade when the height does not exceed 1.5 times the diameter.
Electrical:
1. Repairs and maintenance: Minor repair work, including the replacement of lamps or the connection of approved portable electrical equipment to approved per- manently installed receptacles.
2. Radio and television transmitting stations: The provisions of the codes do not apply to electrical equipment used for radio and television transmissions but do apply to equipment and wiring for a power supply and the installation of towers and antennas.
3. Temporary testing systems: A permit is not required for the installation of any temporary system required for the testing or servicing of electrical equipment or apparatus.
Gas:
1. Portable heating appliance.
-40-
City of Bellflower
Ordinance No. 1449
2. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe.
Mechanical:
1. Portable heating appliance.
2. Portable ventilation equipment.
Portable cooling unit.
P
9°
Steam, hot or chilled water piping within any heating or cooling equipment regulated by the codes.
5. Replacement of any part that does not alter its approval or make it unsafe.
6. Portable evaporative cooler.
7. Self-contained refrigeration system containing 10 pounds or less of refrigerant and actuated by motors of 1 horsepower (746 W) or less.
Plumbing:
1. The stopping of leaks in drains, water, soil, waste or vent pipe, provided, however, that if any concealed trap, drain pipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with the new material, such work is considered new work and a permit must be obtained and inspection made as provided in the codes.
2. The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures and the removal and reinstallation of water closets in their originally approved location, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures.
105.2.1 Emergency repairs. Where equipment replacements and repairs are performed in an emergency situation, the permit application must be submitted within the next working business day to the Building Official.
105.2.2 Public service agencies. A permit is not required for installation, alteration or repair of generation, transmission, distribution or metering or other related equipment that is under the ownership and control of public service agencies by established right. 105.3 Application for permit. To obtain a permit, the applicant must first file an application therefore in writing on a form furnished by the Building Official forthat purpose.
Such application must:
1. Identify and describe the work to be covered by the permit for which application is made.
-41-
City of Bellflower
Ordinance No. 1449
2. Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work.
3. indicate the use and occupancy for which the proposed work is intended.
4. Be accompanied by construction documents and other information as required in Section 107.
5. State the valuation of the proposed work.
6. Be signed by the applicant, or the applicant's authorized agent.
7. Give such other data and information as required by the Building Official. 105.3.1 Action on application. The Building Official will examine or cause to be examined applications for permits and amendments within a reasonable time after filing.
If the application or the construction documents do not conform to the requirements of applicable law, the Building Official must reject such application in writing.
No building permit or other similar applicable permit bearing on property development or use including additions, modifications or revisions may be issued unless and until the review and approval of all other departments and agencies having legal authority for review of construction projects have found the construction project to be in compliance with all applicable code provisions or entitlements.
When the Building Official is satisfied that the proposed work conforms to the requirements of applicable law, the Building Official must issue a permit in accordance with applicable law.
105.3.2 Time limitation of application. An application for a permit for any proposed work is deemed expired 180 days after the completion of the first submittal review unless a permit has been issued. The Building Official is authorized to grant one extension of time of an unexpired application for additional period not exceeding 180 days. The extension must be requested in writing and justifiable cause demonstrated.
For the purpose of this section, contact by a City representative indicating the review is completed is deemed completion of any submittal review. 105.4 Permit issuance. The application, plans, specifications, computations, and other data filed by an applicant for a permit will be reviewed by the Building Official. Such plans may be reviewed by other City officials to verify compliance with applicable law. If the Building Official finds that the work described in an application for a permit and the plans, specifications and other data filed therewith conform to applicable law, and that the specified fees have been paid, the permit must be issued. -42-
City of Bellflower
Ordinance No. 1449
When the Building Official issues the permit where plans are required, they must endorse in writing or stamp the plans and specifications. Such approved plans and specifications cannot be changed, modified or altered without authorization from the Building Official, and all work regulated by the codes must be done in accordance with the approved plans. 105.5 Validity of permit. Issuing a permit or approving plans, specifications, and computations cannot be construed to be a permit for, or an approval of, any violation of applicable law. Permits presuming to give authority to violate or cancel the provisions of the codes or other ordinances of the City are not valid. issuing a permit based on construction documents and other data does not prevent the Building Official from requiring the correction of errors in the construction document and other data. Any addition to or alteration of approved construction documents must be approved in advance by the Building Official, as evidenced by the issuance of a new or amended permit. The Building Official is also authorized to prevent occupancy or use of a structure where in violation of the codes or of any other ordinances of this City. 105.6 Expiration. Every permit issued by the Building Official under the provisions of the codes will expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 12 months from the date issued, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days, except that no permit expires before a date 12 months from the date of being issued. Before such work can be commenced or recommenced, the Building Official must issue a new permit. The Building Officila may not extend, nor is any permit valid, for any period exceeding three years from the original date a permit was issued.
For the purpose of this section, if an inspection approval is not recorded, the work authorized by the permit is deemed not commenced, suspended or abandoned. (1) Requesting extension of an unexpired permit: Any permittee holding an unexpired permit may apply for an extension of time within which permittee may commence work under that permit when the permittee is unable to commence or recommence work within the time required by this section for good cause shown. The Building Official may extend the time for action by the permittee for a period not more than 180 days upon written request by the permittee showing good, cause beyond the control of the permittee have prevented action from being taken. Subject to approval of the Building Official, permits extended in this manner do not require additional permit fees. (2) Requesting reissuance of an expired permit: Any permittee holding a permit which expired may apply for a reissuance of the permit subject to compliance with current regulations and payment of plan check and permit fees. Plans must be resubmitted for plan check.
105.6.1 Expiration of Permit for Unlawful Structure. Notwithstanding any provision of Section 105.6, if a building permit was issued in order to bring an un-permitted structure or other unlawful, substandard, or hazardous condition into compliance with any applicable law, ordinance, rule or regulation, such permit expires 90 days after the date
City of Bellflower
Ordinance No. 1449
on which the permit was issued. The Building Official may extend the validity of the permit for a period not exceeding 90 days beyond the initial 90-day limit upon written request by the applicant filed with the Building Official before the expiration date of the original permit. 105.7 Suspension or revocation. The Building Official is authorized to suspend or ' revoke a permit issued under this code wherever the permit is issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any ordinance or regulation or any of the provisions of the codes.
105.8 Placement of permit. The building permit or a copy must be kept on the site of the work until the completion of the project.
105.9 Responsibility. Every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, must comply with the codes.
105.10 Preliminary inspection. Before issuing a permit, the Building Official is authorized to examine or cause to be examined buildings, structures and sites for which an application has been filed.
105.11 Change of contractor or of ownership. A valid permit terminates upon a change of ownership or a change of contractor regarding the building, structure or grading for which said permit was issued if the work is not complete. A new permit is required for the completion of the work. Permit and applicable fees, must be paid to the City before the Building Official issues a new permit. if, however, changes have been made to the plans and specifications last submitted to the Building Official, a permit fee based upon the proposed changes may be levied.
105.12 incomplete construction. When a permit is revoked pursuant to Section 105.7 or abandoned pursuant to Section 105.6, the incomplete construction for which the permit is issued constitute a public nuisance and must be appropriately abated as in accordance with the procedure set forth in Chapter 8.36.
105.13 Surrender of permit. If a portion of the work or construction covered by the issued permit has not been commenced, the permittee may deliver such permit and approved documents to the Building Official with request that such permit is to be canceled. The Building Official will make note on the permit with or with like wording “Canceled at the request of the Permittee.” Thereupon the permit and documents become void. 105.14 Liens to be discharged. A permit cannot be issued to any person or corporation under the provision of this Title where the cost of any building repair or abatement was performed and a lien is recorded by the City, until the amount of such lien with interestis paid to the City in full.
F. Chapter 1, Division II (Scope and Administration), SectiOn 107.1, 107.2, 107.32, 107.3.3, 107.3.4.1, and 107.5 are amended as follows:
SECTION 107 — CONSTRUCTION DOCUMENTS
-44-
City of Bellflower
Ordinance No. 1449
107.1 General. Construction documents, statement of special inspections, geotechnical reports and other data must be submitted in three or more sets, or in a digital formal where allowed by the Building Official, with each permit application. The construction documents must be prepared by a registered design professional where required by the statutes of the City in which the project is to be constructed. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional.
Exception: The Building Official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if the Building Official finds that the nature of the work applied for is such that review of construction documents is not necessary to obtain compliance with the codes. 107.2 Information on construction documents. Construction documents must be dimensioned and drawn upon suitable material. Electronic media documents are permit- ted to be submitted when approved by the Building Official. Construction documents must be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of the codes and relevant laws, ordinances, rules and regulations, as determined by the Building Official. 107.3.2 Previous approvals. The codes cannot require changes in the construction documents, construction or designated occupancy of a structure for which a lawful permit was previously issued or otherwise lawfully authorized, and the construction of which was pursued in good faith within 180 days after the effective date of the codes, has not been abandoned or the Building Official has not determined the permit was issued under false information.
107.3.3 Phased approval. The Building Official is authorized to issue a permit for the construction of foundations or any other part of a building or structure before the construction documents for the whole building or structure have been submitted, provided that adequate information and detailed statements are filed complying with pertinent requirements of the codes and the BMC. The holder of such permit for the foundation or other parts of a building or structure must proceed at the holder's own risk with the building operation and without assurance that a permit for the entire structure will be granted. 107.3.4.1 Deferred submittals. For the purposes of this section, deferred submittals are defined as those portions of the design that are not submitted at the time of the application and that are to be submitted to the Building Official within a specified period.
Deferral of any submittal items must have the prior approval of the Building Official. The registered design professional in responsible charge must list the deferred submittals on the construction documents for review by the Building Official.
Documents for deferred submittal items must be submitted to the registered design professional in responsible charge who must review them and forward them to the Building Official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building. -45-
City of Bellflower
Ordinance No. 1449
The deferred submittal items must not be installed until the design and submittal documents have been approved by the Building Official.
107.5 Retention of construction documents. One set of approved construction documents must be retained by the Building Official for a period of not less than that required by applicable law and the City’s retention policy.
G. Chapter 1, Division II (Scope and Administration), Section 107.6 -— Self- Certification Program, is added as follows:
107.6 Self-Certification Program.
1. Purpose. To expedite building permit approvals by allowing Licensed Design Professionals to voluntarily self-certify building plans.
2. Definitions. Unless the contrary is stated or clearly appears from the context, the following definitions will govern the construction of the words and phrases used in this section:
(a) “Setf-certification," “self-certify” or “self—certified” means the submission to the Building Official (i) is made by a Licensed Design Professional identified in the building permit application; (ii) accompanies plans filed with Building Division by that Licensed Design Professional; and (iii) that Licensed Design Professional attests such plans (1) do not contain any false information, (2) are in compliance with requirements of the applicable State and City of Bellflower laws, codes, and regulations, and (3) were prepared by or under the direct supervision of, and signed and stamped by, that Licensed Design Professional. (b) “Licensed Design Professional” means the California Licensed Architect or Engineer, as applicable, identified as such on the building permit application and accompanying plans.
3. Eligible Participants. In order to participate in the Program, applicants must be registered and be in good standing as a Licensed Design Professional with the State of California.
4. insurance Requirements. For a project to be accepted for Self-Certification, the Licensed Design Professional is required to furnish the Building Official a Certificate of Professional Liability Insurance, issued by an insurer authorized to insure in the State of California. The amount of required coverage will be reasonably determined by the City Manager or his designee; typically, a minimum of $1,000,000, but not less than the valuation of the permitted project.
5. Optional Prescreening Process. The Licensed Design Professional who intends on filing an application with a Self-Certification may meet with the Building Official, or designee, for a courtesy prescreening of the proposed project to ensure the submittal is complete.
-45-
City of Bellflower
Ordinance No. 1449
6. Submittal Requirements. The Licensed Design Professional who intends on filing an application with a Self-Certification must submit that application to participate in the program to the Building Official. Self-certified plans must contain all the information listed in the corresponding City of Bellflower handout regarding building design criteria. A Self- Certification form and a “hold harmless” letter, in a form approved by the city attorney, must be completed in its entirety and submitted for each project by the design team and the property owner. The Self-Certification program will be all inclusive, all construction trade work that requires permits for the project must be Self-Certified. Each page of the plans submitted, must be wet stamped and signed by a Licensed Design Professional for each applicable trade.
7. Non-Building Division Approvals. The Licensed Design Professional who intends on filing an application with a Self-Certification must provide documentation to the Building Official demonstrating final approvals of any applicable City Divisions/Departments, such as Planning, Public Works, and Engineering before permit issuance. That licensed design professional must also provide documentation to the Building Official appropriate approvals of any applicable “outside” agency. Those outside agencies include, without limitation, the following: Los Angeles County Health Department, school districts, Air Quality Management Districts, and Los Angeles County Sanitation District.
8. Fees: All fees set forth in the City’s Comprehensive Fee Schedule apply.
9. Permit Issuance. Applications that have met all the criteria of this voluntary Self-Certification program wili be issued a building permit the same day of completed and approved application submittal.
10.lnspection Protocol. All code-required State of California or City of Bellflower inspections are required.
11.Audits. All Self-Certified plans are subject to auditing by the Building Official to determine whether plans comply with the applicable State and City of Bellflower laws, codes, rules, and regulations. If plans are found to be in non-compliance, then the Licensed Design Professional who intends on filing an application with a Self-Certification will ensure compliance. lf compliance is not obtained within a reasonable amount of time, then the Building Official may report the non-compliance items to the appropriate licensing board with the State of California.
H. Chapter 1, Division II (Scope and Administration), Section 108 -— Temporary Structures and Uses, is amended as follows:
SECTION 108 — TEMPORARY STRUCTURES AND USES
108.1 General. The Building Official is authorized to issue a permit for temporary structures, equipment or systems and temporary uses. Such permits must be limited as to time of service but cannot be permitted for more than 12 months. The Building Official is authorized to grant extensions for demonstrated good cause.
City of Bellflower
Ordinance No. 1449
108.2 Conformance. Temporary structures and uses must conform to the structural strength, fire safety, means of egress, accessibility, light, ventilation and sanitary requirements of the codes as necessary to ensure public health, safety and general welfare.
108.3 Temporary power. The Building Official is authorized to give permission to temporarily supply and use power in part of an electric installation before such installation has been fully completed and the final certificate of completion has been issued. The part covered by the temporary certificate must comply with the requirements specified for temporary lighting, heat or power in the California Electrical Code. 108.4 Termination of approval. The Building Official is authorized to terminate such permit for a temporary structure or use and to order the temporary structure or use to be discontinued.
i. Chapter 1, Division II (Scope and Administration), Section 109 — Fees, is amended as follows:
SECTION 109 — FEES
109.1 General. A fee as established by resolution of the City Council must be paid for each plan review when submitted and each permit at time of issuance. 109.2 Permit fees. A fee for each required permit must be assessed in accordance with the fee schedule adopted by City Council resolution.
Failure to pay fees and obtain a permit before commencing work is a misdemeanor, except when a program is established by the Building Official and permit conditions are defined, or it can be proven to the satisfaction of the Building Official that an emergency existed which made it impractical to first obtain the permit. A violation will result in an assessment of an investigation fee in an amount equal to the permit fee for the work undertaken without permit. Payment of a double fee does not relieve any person from fully complying with the requirements of the codes nor from any other penalties prescribed herein.
109.3 Permit valuations. The applicant for a permit must provide an estimated permit value at time of application. Permit valuations must reflect the total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application, the permit will be denied, unless the applicant can show detailed estimates to meet the approval of the Building Official. Final building permit valuation is set by the Building Official. 109.4 Plan review fees. When a plan or other data is ready to be submitted in accordance with Section 105.3, a plan-checking fee, in the amount as established by City Council must be paid to the Building Official at the time of submitting plans and specifications for checking. When submittal documents are incomplete or include changes so as to require additional plan review or when the project involves differed submittal items an additional -43-
City of Bellflower
Ordinance No. 1449
fee must be assessed in accordance with the fee schedule established by City Council.
Plan deficiencies identified in the initial plan review that are not resolved by the third review shall render the plan submittal incomplete and additional fees shall be assessed. 109.5 Investigation fee. An investigation fee as established by Section 109.2 may be charged by the Building Official whenever work for which a permit is required by the codes has been commenced without first obtaining a permit. This fee must be paid and the investigation must be made before the issuance of any permit for said work. An investigation fee may be charged for any investigation of a building, structure, work reports, certification or any other related work requested by an owner or authorized agent of such owner.
109.6 Fee Refunds. In the event that an applicant has submitted for plan review or obtained a permit and no portion of the review, work, or construction covered by such permit has been commenced, and such permit is cancelled, the applicant may submit a written request to the Building Official requesting a refund of permit fees. The request must be submitted within one year of the date of cancellation or expiration of the permit.
The Building Official may refund all or a portion of the permit fees to the applicant except that no portion of any permit issuance fee or other administrative fee shall be refunded. 109.7 Change of Occupancy Investigation fee. A fee as established by City Council resolution must be paid when an occupancy investigation inspection is required by the Building Official. Note: The occupancy investigation fees are in addition to other investigation fees and do not include the fees for the building permit, or fees for electrical, plumbing or mechanical permits covering the alterations and/or repairs of the occupancy conversion.
J. Chapter 1, Division II (Scope and Administration), Section 111 — Certificate of Occupancy, is amended as follows:
SECTION 111 - CERTIFICATE OF OCCUPANCY
111.1 Use and occupancy. No building or structure can be used or occupied in whole or in part, and no change in the existing use or occupancy classification of a building or structure or portion thereof can be made until the Building Official issues a certificate of occupancy. The Building Official cannot issue a Certificate of Occupancy to the builder upon the completion of a commercial structure where there is tenant space. Instead, a Certificate of Occupancy is issued to a business entity that is going to occupy the building or a portion thereof. Issuing a certificate of occupancy is not an approval of a violation of the provisions of the codes or other ordinances of the City.
Exception: The Building Official may not issue Certificate of Occupancies for single and duplex residential dwelling units and owner-occupied dwelling units, such as townhomes, condominiums and U occupancies. Certificates of occupancy are not required for work exempt from permits in accordance with Section 105.2.
-49-
City of Bellflower
Ordinance No. 1449
111.2 Time limitation of application. An application for a certificate of occupancy is deemed abandoned one year after the date of filing, unless such application has been pursued in good faith or a certificate of occupancy has been issued. 111.3 Certificate issued. After the Building Official inspects the building or structure and finds no violations of the provisions of the codes or other laws that are enforced by the City, the Building Official must issue a certificate of occupancy that contains the following:
1. The building permit number.
2. The address of the structure.
3. The name and address of the owner.
4. A description of that portion of the structure for which the certificate is issued.
5. A statement that the described portion of the structure has been inspected for compliance with the requirements of the codes for the occupancy and division of occupancy and the use for which the proposed occupancy is classified.
6. The name of the Building Official.
7. The edition of the code under which the permit was issued.
8. The use and occupancy, in accordance with the provisions of Chapter 3.
9. The type of construction as defined in Chapter 6.
10.The design occupant load.
11.lf an automatic sprinkler system is provided, whether the sprinkler system is required.
12.Any special stipulations and conditions of the building permit. 111.4 Temporary occupancy. The Building Official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions must be occupied safely. The Building Official must set a time period during which the temporary certificate of occupancy is valid. in the event the building is not completed and ready for final inspection in the time prescribed by the Building Official, the building must be vacated and the utilities disconnected until such time the building is completed, final inspection is completed and a Certificate of Occupancy is issued.
111.5 Revocation. The Building Official is authorized to, in writing, suspend or revoke a certificate of occupancy or completion issued under the provisions of the codes, in writing, wherever the certificate is issued in error, or on the basis of incorrect information supplied, -50-
City of Bellflower
Ordinance No. 1449
or where it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation or any of the provisions of the codes.
K. Chapter 1, Division ll (Scope and Administration), Section 112 — Service Utilities, is amended as follows:
SECTION 112 — SERVICE UTILITIES
112.1 Connection of service utilities. Connections from a utility, source of energy, fuel or power, or a water system or sewer system to any building or system that is regulated by the codes for which a permit is required, must not be established until released by the Building Official.
112.2 Temporary connection. The Building Official may authorize the temporary connection of the building or system to the utility, the source of energy, fuel or power, or the water system or sewer system for the purpose of testing systems or for use under a temporary approval.
Temporary connections may be terminated by the Building Official in the event the permit for such work expires, temporary occupancy is terminated, or it is determined by the Building Official that conditions associated with the connected utility are not met. 112.3 Authority to disconnect service utilities. The Building Official may cause or order the disconnection or discontinuance of utility service to a building, structure, premises, system, equipment, fixture, or device that is regulated by this Code or by the referenced codes and standards set forth in Section 101.4, or elsewhere in the BMC: (i) when necessary to eliminate or mitigate an immediate hazard to life, health, safety, or property; (ii) when such building, structure, system, equipment, fixture, or device, or any utility service thereto, has been installed, equipped, altered, or used without requisite approvals, permits, or inspections; or (iii) when such building, structure. premises, system, equipment, fixture or device is found to be an unlicensed cannabis facility. An “unlicensed cannabis facility" means any facility within the City conducting commercial cannabis activity without a permit issued in accordance with the BMC.
The Building Official must attempt to notify the serving utility, and wherever possible the owner or the owner’s authorized agent and occupant of the building, structure, premises, system, equipment, fixture, or device, of the decision to disconnect before taking such action; provided that the Building Official may dispense with any attempt at prior notification if, in the sole discretion of the Building Official, the nature or severity of the hazard justifies such inaction. If not notified before disconnecting, the Building Official must notify the owner of the owner’s authorized agent or occupant of the building, structure, premises, system, equipment, fixture, or device in writing of the disconnection as soon as practical thereafter.
The utility service must remain disconnected or discontinued until the Building Official releases the utility service. The Building Official cannot release the utility service until: (i) the imminent hazard has been abated or eliminated; or (ii) all requisite approvals, permits, -51-
City of BeIIflower
Ordinance No. 1449
and inspections have been obtained for the building, structure, system, equipment, fixture, or device, or any utility service thereto.
L. Chapter 1, Division II (Scope and Administration), Section 112 — Means of Appeals, is amended as follows:
SECTION 113 — BOARD OF APPEALS - CITY COUNCIL
113.1 General. The City Council is designated to hear and decide appeals of orders, decisions or determinations made by the Building Official relative to the application and interpretation of this code. All references to the “Board of Appeals” means the City Council.
113.2 Limitations an authority. The Board of Appeals does not have authority to interpret the administrative provisions of the codes, nor is the Board empowered to waive requirements of the codes. The application for appeal must be based on a claim that the true intent of the codes or the rules legally adopted thereunder was incorrectly interpreted where the provision of the codes do not fully apply, or where an equally good or better form of construction is proposed.
113.3 Applications, fees and findings. Any person appealing the decision of the Building Official must file with the Building Official a written application accompanied by a filing fee in accordance with the fee schedute adopted by City Council resolution at any time not more than 20 calendar days after the decision of the Building Official.
The application must set forth and include any information the Building Official may require.
Upon the filing of a verified application, the Building Official must transmit said application forthwith to the Board of Appeals, and such Board must investigate, examine, review, hear testimony, from and on behalf of the applicant, and render findings and decisions on the matter in writing to the applicant with a duplicate copy to the Building Official within 20 days after the conclusion of its proceedings, the Building Official must make all findings and decisions available to the public without fees.
M. Chapter 1, Division II (Scope and Administration), Section 114 — Violations, is amended as follows:
SECTION 114 — VIOLATIONS AND PENALTIES
114.1 General. Violation of the codes constitutes a misdemeanor. In addition, such violation constitutes a public nuisance subject to abatement in accordance with applicable law.
114.2 Notice of violation. The Building Official is authorized to serve a notice of violation or order on the person responsible for the erection, construction, alteration, extension, repair, moving, removal, demolition or occupancy of a building or structure in violation of the provisions of the codes, or in violation of a permit or certificate issued under the -52-
City of Bellflower
Ordinance No. 1449
provisions of the codes. Such order must direct the discontinuance of the illegal action or condition and the abatement of the violation.
114.3 Compliance with Notice and prosecution of violation. If the notice of violation is not complied with promptly, the Building Official is authorized to request the City Attorney to institute the appropriate proceeding at law or in equity to restrain, correct or abate such violation, or to require the removal or termination of the unlawful occupancy of the building or structure in violation of the provisions of the codes or of the order or direction made pursuant thereto. No person may remain in or enter any building or structure that has been posted with a red tag by the Building Official. Notwithstanding the foregoing, a person may enter the building or structure to repair, demolish or remove such building or structure pursuant to a duly issued permit. No person may remove or deface any order issued by the Building Official including, without limitation, a red tag, after it is posted until the required repairs, demolition or removal have been completed and a certificate of occupancy has been issued, where applicable. 114.4 Violation penalties. Any person who violates a provision of the codes or fails to comply with any of the requirements thereof or who erects, constructs, alters or repairs a building or structure in violation of the approved construction documents or directive of the Building Official, or of a permit or certificate issued under the provisions of the codes, is subjected to penalties as prescribed by law.
N. Chapter 1, Division ll (Scope and Administration), the title of Section 116 — Unsafe Structures and Equipment, is amended as follows:
SECTION 116 — UNSAFE STRUCTURES AND BUILDINGS
0. Chapter 1, Division II (Scope and Administration), Sections 116.1, 116.2,116.3 are amended as follows:
116.1 General. All buildings, structures or existing equipment that are or hereafter become unsafe, insanitary or deficient because of inadequate means of egress facilities, inadequate light and ventilation, or which constitute a fire hazard, or are otherwise dangerous to human life or the public welfare, or that involve illegal or improper occupancy or inadequate maintenance, are, for the purpose of this section, unsafe conditions. All such unsafe buildings or conditions are public nuisances and must be abated by repair, rehabilitation, improvement, removal, or demolition, in whole or part.
A vacant building or structure that is not secure against entry is deemed “unsafe.” 116.2 Placards and orders relating to occupancy of unsafe structures and buildings. Pursuant to the completion of a visual, nondestructive examination to determine the condition for continued occupancy, the Building Official or designee is authorized to designate the condition of the unsafe building or structure with a placard or order, as follows:
1. A “stop work” order means an order requiring the immediate cessation of all work being done contrary to the provisions of Title 15 or other pertinent laws or ordinances implemented through the enforcement of this Code, or which -53-
City of Bellflower
Ordinance No. 1449
results in a dangerous, hazardous or unsafe condition. Persons notified of this order must immediately stop such work until otherwise authorized by the Building Official or designee.
2. A “limited access” order or “yellow tag” denotes restricted use and is to be posted on each building or structure that has been damaged wherein the damage has resulted in some form of restriction to the continued occupancy. The individual who posts this placard will note in general terms the type of damage encountered and will clearly note the restrictions on continued occupancy.
3. A “do not enter — unsafe to occupy” order or “red tag" denotes that the building or structure is so damaged that continued occupancy poses a threat to life safety. Buildings or structures posted with this placard may not be entered under any circumstance except as authorized in writing by the building official or designee. Safety assessment teams are authorized to enter these buildings at any time. This placard is not to be used or considered as a demolition order. The individual who posts this placard will note in general terms the type of damage encountered.
The appropriate placard must be posted at each entry point to a building or structure.
Once it has been attached to a building or structure, a placard is not to be removed, altered or covered until done so by an authorized representative of the building official. It is unlawful for any person, firm or corporation to alter, cover or deface a placard pursuant to this section.
116.3 Notice. If an unsafe condition is found, the Building Official must serve on the owner, agent or person in control of the structure, a written notice that describes the condition deemed unsafe and specifies the required repairs or improvements to be made to abate the unsafe condition, or that requires the unsafe structure to be demolished within a reasonable time. Such notice will be deemed properly served when made in conjunction with section 1.04.080 of the Bellflower Municipal Code.
P. Chapter 1, Division II (Scope and Administration), Section 117 — Construction Hours of Operation, is added as follows:
SECTION 117 CONSTRUCTION HOURS OF OPERATION
117.1 Hours of Construction. No construction activities may commence within the City of Beliflower except as set forth in Table 118.1 below or as otherwise approved by the Building Official: ,
Table 117.1 Construction Hours of Operations
Start Time End Time
7:00 am. 6:00
8:00 am. 6:00
Not Permitted Not Permitted
City of Bellflower
Ordinance No. 1449
For purposes of this Section, construction includes, without limitation, site preparation, demolition, grading, excavation, and the erection, improvement, remodeling, or repair of buildings or structures, including operation of equipment or machinery and the delivery of material associated with those activities, irrespective of whether a building permit is required for the construction.”
Q. Table 1505.1 is hereby amended, by the deletion of Table 1505.1 and the addition of a new Table 1505.1 thereto, to read as follows:
TABLE 1505.1a
MINIMUM ROOF COVERING CLASSIFICATIONS
TYPES OF CONSTRUCTION
IA IB IIA IIB IIIA IIIB IV VA VB
B B B B B B B B B
For Si: 1 foot = 304.8 mm, 1 square foot = 0.0929 m2.
a. Unless otherwise required in accordance with Chapter 7A.
R. Section 1505.1.2 is hereby amended, by the deletion of the entire section and the addition of a new section thereto, to read as follows:
1505.1.2 Roof coverings within all other areas. The entire roof covering of every existing structure where more than 50 percent of the total roof area is replaced within any one-year period, the entire roof covering of every new structure, and any roof covering applied in the alteration, repair or replacement of the roof of every existing structure, shall be a fire-retardant roof covering that is at least Class B.
SECTION 4. BMC Chapter 15.08 is amended in its entirety to read as follows:
“Chapter 15.08 ELECTRICAL CODE
15.08.010 Electrical Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 3 (the 2025 California Electrical Code) is adopted by reference as the Electrical Code of the City of Beliflower.
In accordance with Government Code § 50022.6, one copy of the 2025 California Electrical Code must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.08.020 Amendments.
A. Article 91 is added to read as follows:
Article 91
Administrative Provisions
-55-
City of Bellflower
Ordinance No. 1449
For administrative provisions for this Code, see § 1504.040.” SECTION 5. BMC Chapter 15.12 is amended in its entirety to read as follows:
“Chapter 15.12 PLUMBING CODE
15.12.010 Plumbing Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 5 (the 2025 California Plumbing Code) with amendments and including Appendices A, B, C, D, E, G, I, K, and L is adopted by reference as the Plumbing Code of the City of Bellflower.
In accordance with Government Code § 50022.6, one copy of the 2025 California PlumbingCode must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.12.020 Amendments.
A. Chapter 1 Division IE is amended in its entirety to read as follows:
Chapter1 Division II
Administrative Provisions
For administrative provisions for this Code, see § 1504.040.” SECTION 6. BMC Chapter 15.16 is amended in its entirety to read as follows:
“Chapter 15.16 MECHANICAL CODE
15.16.010 Mechanical Code - Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 4 (the 2025 California Mechanical Code) with amendments and including Appendices C, D, E, and F is adopted by reference as the Mechanical Code of the City of BeIIflower.
In accordance with Government Code § 50022.6, one copy of the 2025 California Mechanical Code must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.16.020 Amendments.
A. The text within Chapter 1 Division II is amended to read as follows:
Chapter1 Division II
Administrative Provisions
-56-
City of Bellflower
Ordinance No. 1449
For administrative provisions for this Code, see § 1504.040.” SECTION 7. BMC Chapter 15.40 is amended in its entirety to read as follows:
“Chapter 15.40 FIRE CODE
15.40.010 Fire Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 9 (the 2025 California Fire Code) with amendments, including Section 503and Appendices Chapter 4, B, C, D, H, l, M, and O is adopted by reference as the Fire Code of the City of Bellflower.
In accordance with Government Code § 50022.6, one copy of the chapters and appendices must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
Only the Bellfiower Building Official is authorized to exercise the authority in CBSC § 105.4 including, without limitation, issuing building permits.
15.40.020 Amendments.
A. Section 111, including its subparts, is amended to read as follows:
SECTION 111 — BOARD OF APPEALS — CITY COUNCIL
111.1 General. The City Council is designated to hear and decide appeals of orders, decisions or determinations made by the Fire Code Official relative to the application and interpretation of this Division. All references to the “Board of Appeals” means the City Council.
111.2 Limitations on authority. An application for appeal will be based on a claim that the intent of this code or the rules legally adopted hereunder have been incorrectly interpreted, the provisions of this code do not fully apply, or an equivalent method of protection or safety is proposed. The Board does not have the authority to waive the requirements of this code.
111.3 Applications, fees and findings. Any person appealing the decision of the Fire Code Official must file with the Building Official a written application accompanied by a filing fee in accordance with the fee schedule adopted by City Council resolution at any time not more than 20 calendar days after the decision of the Fire Code Official.
The application must set forth and include any information the Building Official may require.
Upon the filing of a verified application, the Building Official must transmit said application forthwith to the Board of Appeals, and such Board must investigate, examine, review, -57-
City of Bellflower
Ordinance No. 1449
hear testimony, from and on behalf of the applicant, and render findings and decisions on the matter in writing to the applicant with a duplicate copy to the Building Official within 20 days afterthe conclusion of its proceedings, the Building Official must make all findings and decisions available to the public without fees.
B. Section 202 is amended by revising the following definitions:
FIRE CHIEF. The City Manager for the City of Bellflower, or designee. Unless otherwise determined by the City Manager, the Fire Chief for the Consolidated Fire Protection District of Los Angeles County ("Fire District") may enforce this chapter as the "Fire Chief" and "Fire Official" for purposes of California Fire Code ("CFC") Section 202. Any such enforcement authority must be exercised in cooperation with the City Manager or designee(s)-to ensure a uniform enforcement of applicable law within the city's jurisdiction.
FIRE CODE OFFICIAL. "Fire Code Official" means the "Building Official." SECTION 8. BMC Chapter 15.56 is amended in its entirety to read as follows:
“Chapter 15.56 ENERGY CODE
15.56.010 Energy Code - Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 6 (the 2025 California Energy Code) with amendments and including Appendices 1A and 1B is adopted by reference as the Energy Code of the City of Bellflower.
In accordance with Government Code § 50022.6, one copy of the 2025 California Energy Code must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.56.020 Amendments.
A. Section 100.2 is added to Subchapter1 to read as follows:
Section 100.2
Administrative Provisions
For administrative provisions for this Code, see § 1504.040.” SECTION 9. BMC Chapter 15.60 is amended in its entirety to read as follows:
“Chapter 15.60 RESIDENTIAL CODE
15.60.010 Residential Code — Adopted by Reference; Where Filed.
EASTE‘EB _T“5”i“1")',y;r
City of Bellflower
Ordinance No. 1449
Chapter 1 Division II and Chapters 2 through 10, and 44 of California Code of Regulations Title 24, Part 2.5 (the 2025 California Residential Code) are adopted by reference as the Residential Code of the City of Bellflower.
in accordance with Government Code § 50022.6, one copy of the chapters and appendices must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.60.020 Administrative Provisions.
A. The text within Chapter 1 Division II is amended to read as follows:
Chapter 1 Division ll
Administrative Provisions
For administrative provisions for this Code, see § 1504.040."
15.60.030 Design Criteria
A. Table R301 .2(1) is amended, by deleting Table R301.2(1) and replacing it with a new Table R301“ 12(1) to read as follows
wmc DESIGN 'suaJEcTTo DAMAGEFRVOM‘ . 7 . g ._ he“
Wind ' Barrier
Special home Seismic ' Frost I_Winter Under-
}llIind. _i , debris Design Weathering line. ' .
Region 10:19.. Category; ' .
595 Exposure Yes No D2 orE Negligible 12-24" Very 40 No Yes 0 63 ‘ ’ Heavy
79 "35.68" "37"' M 91" NIAM‘ 70' ‘75" M ‘ I ‘ -
Difference
For SI: 1 pound per aqua-e foot = 0.0479 kPa, 1 mile per hour - 0.447 mls. -59-
City of Bellflower
Ordinance No. 1449
is. Where weathering requires a higher strength concrete or grade of masonry than necessary to satisfy the structural requirements of this code, the frost line depth strength required for weathering shall govern. The weathering column shall be filled in with the weathering index, “negligible," “moderate” or “severe" for concrete as determined from Figure 1601.20). The grade of masonry units shall be determined from ASTM C34, ASTM C55, ASTM C62, ASTM C73, ASTM C90, ASTM C129, ASTM C145, ASTM C216 or ASTM C652. b. Where the frost line depth requires deeper footings than indicated in Figure R403.1(1), the frost line depth strength required for weathering shall govern. The jurisdicn'on shall fill in the frost line depth column with the minimum depth of footing below finish grade. c. The jurisdiction shall fill in this part of the table to indicate the need for protection depending on whether there has been a history of local subterranean termite damage. d. The jurisdiction shall fill in this part of the table with the wind speed from the ultimate design wind speeds map [Figure P301.2(2)]. Wind exposure category shall be determined on a site— specific basis in accordance with Section R301.2.1.4.
e. The jurisdiction shall fill in this section of the table to establish the design criteria using Table 10A from ACCA Manual J or established criteria determined by the jurisdiction. f. The jurisdiction shall fill in this part of the table with the seismic design category determined from Section R301.2.2.1. g. The jm-isdiction shall fill in this part of the table with: the date of the jurisdiction’s entry into the National Flood Insurance Program (date of adoption of the first code or ordinance for management of flood hazard areas); and the title and date of the currently effective Flood Insurance Study or other flood hazard study and maps adopted by the authority having jurisdiction, as amended.
h. In accordance with Sections R905.1.2, R905.4.3. 1, R905.5.3.l, 119056.31, R905.7.3.l and R905.8.3.l, where there has been a history of local damage from the effects of ice damning. the jurisdiction shall fill in this part of the table with “YES.” Otherwise, the jurisdiction shall fill in this part of the table with “NO.” i. The jurisdiction shall fill in this part of the table with the 100-year return period air freem'ng index (BF-days) from Figure R403.3(2) or from the loo-year (99 percent) value on the National Climatic Data Center data table “Air Freezing Index-USA Method (Base 32°F).” j. The jurisdiction shall fill in this part of the table with the mean annual temperature from the National Climatic Data Center data table “Air Freezing Index-USA Method (Base 32°F)" k. In accordance with Section R3011. 1.5, where there is local historical data documenting structural damage to buildings due to topographic wind speed—up effects, the jurisdiction shall fill in this part of the table with “YES.” Otherwise, the jurisdiction shall indicate “NO" in this part of the table.
1. In accordance with Figure 1801.2(2), where there is local historical data documenting unusual wind conditions, the jurisdiction shall fill in this part of the table with “YES" and identify any specific requirements. Otherwise, the jurisdiction shall indicate “N0” in this part of the table. min accordance with Section R301.2.1.2 the jurisdiction shall indicate the wind-home debris wind zone(s). Otherwise, the jurisdiction shall indicate “NO” in this part of the table.
11. The jurisdiction shall fill in these sections of the table to establish the design criteria using Table 1a or II: from ACCA Manual J or established criteria determined by the jurisdiction
0. The jurisdiction shall fill in this section of the allowable stress design table using the Ground Snow Loads in Figure R301.2(3).
15.60.040 Soil Tests
A. Section R401.4.1.1.5.1 is added to read as follows:
R401 .4.1.1 .5.1 A soils investigation report shall be provided for all projects exceeding 750 square feet or more than one story in height. Projects under 750 square feet may meet the necessary seismic hazard mitigation following the City of Bellflower Seismic Hazard Mitigation handout.
B. I Section R902.1 is amended, by deleting the entire section and adding a new ' section, to read as follows:
R902.1 Roofing covering materials. Roofs must be covered with materials as set forth in Sections R904 and R905. A minimum Class A or B roofing must be installed in areas designated by this section. Classes A and B roofing required by this section to be listed must be tested in accordance with UL 790 or ASTM E 108.
Exceptions:
1. Class A roof assemblies include those with coverings of brick, masonry and exposed concrete roof deck.
2. Class A roof assemblies also include ferrous or copper shingles or sheets, metal sheets and shingles, clay or concrete roof tile, or slate installed on noncombustible decks or ferrous, copper or metal sheets installed without a roof deckon noncombustable framing.
3. Class A roof assemblies include minimum 16 ounces per square foot (4.882 kg/m2) copper sheets installed over combustible decks.
4. Class A roof assemblies include slate installed over ASTM D226, Type II underlayment over combustible decks.
C. Section R902.1.2 is amended, by deleting the entire section and replacing it with a new section, to read as follows:
R902.1.2 Roof coverings within all other areas. The entire roof covering of every existing structure where more than 50 percent of the total roof area is replaced within any one-year period, the entire roof covering of every new structure, and any -50-
City of Bellflower
Ordinance No. 1449
roof covering applied in the alteration, repair or replacement of the roof of every existing structure, shall be a fire-retardant roof covering that is at least Class B.
SECTION 10. BMC Chapter 15.64 is amended in its entirety to read as follows:
“Chapter 15.64 GREEN BUILDING STANDARDS CODE
15.64.010 Green Building Standards Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 11 (the 2025 California Green Building Standards Code) is adopted by reference as the Green Building Standards Code of the City of Bellflower.
In accordance with Government Code § 50022.6, one copy of California Code of Regulations Title 24, Part 11 (2025 California Green Building Standards Code) must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.64.020 Administrative provisions.
A. The text within Chapter 1 is added to read as follows:
Chapter 1
Administrative Provisions
For administrative provisions for this Code, see § 15.04.040." SECTION 11. BMC Chapter 15.76 is added to read as follows:
“Chapter 15.76 EXISTING BUILDING CODE
15.76.010 Existing Building Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 10 (the 2025 California Existing Building Code) with amendments and including Appendices A, B, and C is adopted by reference as the Existing Building Code of the City of Bellflower.
In accordance with Government Code § 50022.6, one copy of California Code of Regulations Title 24, Part 10 (2025 California Existing Building Code) must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.
15.76.020 Amendments.
A. The text within Chapter 1 Division 2 is amended to read as follows:
Chapter 1 Part 2
Administrative Provisions
-51-
City of Bellflower
Ordinance No. 1449
For administrative provisions for this Code, see § 1504.040.” SECTION 12. BMC Chapter 15.80 is added to read as follows:
“Chapter 15.80 REFERENCED STANDARDS CODE
15.80.010 Referenced Standards Code — Adopted by Refence; Where Filed.
California Code of Regulations Title 24, Part 12 (the 2025 California Referenced Standards Code) is adopted by reference as the Referenced Standards Code of the City of Bellflower.
In accordance with Government Code § 50022.6, one copy of California Code of Regulations Title 24, Part 12 (2025 California Referenced Standards Code) must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Building Official for use and examination by the public.” SECTION 13. BMC Chapter 15.84 is added to read as follows:
“Chapter 15.84 WILDLAND-URBAN INTERFACE CODE
15.84.010 Wildland-Urban Interface Code — Adopted by Reference; Where Filed.
California Code of Regulations Title 24, Part 7 (the 2025 California Wildland-Urban Interface Code) is adopted by reference as the Wildland-Urban Interface Code of the City of Bellflower.
In accordance with California Government Code § 50022.6, one (1) copy of California Code of Regulations Title 24, Part 7 (2025 California Wildland-Urban Interface Code) must remain on file with the Building Official within the Department of Planning and must be at all times maintained by the Buiiding Official for use and examination by the public.
15.84.020 Amendments.
A. The text within Chapter 1 Division 2, Section 103 through 113 is amended to read as follows:
Chapter 1 Part 2
Administrative Provisions Section 103-113
For administrative provisions of Section 103-1 13 for this Code, see § 1504.040.” SECTION 14. Construction. This Ordinance must be broadly construed in order to achieve the purposes stated in this Ordinance. It is the City Council’s intent that the provisions of this Ordinance be interpreted or implemented by the City and others in a manner that facilitates the purposes set forth in this Ordinance. -6 2-
City of Bellflower
Ordinance No. 1449
SECTION 15. Enforceability. Repeal of any provision of the Bellflower Municipal Code does not affect any penalty, forfeiture, or liability incurred before, or preclude prosecution and imposition of penalties for any violation occurring before this Ordinance’s effective date. Any such repealed part will remain in full force and effect for sustaining action or prosecuting violations occurring before the effective date of this Ordinance.
SECTION 16. Validity of Previous Code Sections. If this entire Ordinance or its application is deemed invalid by a court of competent jurisdiction, any repeal or amendment of the BMC or other city ordinance by this Ordinance will be rendered void and cause such previous BMC provision or other the city ordinance to remain in full force and effect for all purposes.
SECTION 17. Environmental Assessment. The City Council finds that adoption of this Ordinance is exempt from review under the California Environmental Quality Act (Public Resources Code §§ 21000, et seq., “CEQA”) and the regulations promulgated thereunder (14 California Code of Regulations §§ 15000, et seq., the “CEQA Guidelines”) because it consists only of minor revisions and clarifications to an existing code of construction-related regulations and specification of procedures related thereto and will not have the effect of deleting or substantially changing any regulatory standards or findings required therefor, and therefore does not have the potential to cause significant effects on the environment. In addition, this ordinance is an action being taken for enhanced protection of the environment and is exempt from further review under CEQA Guidelines § 15308.
SECTION 18. Severability. If any part of this Ordinance or its application is deemed invaiid by a court of competent jurisdiction, the city council intends that such invalidity will not affect the effectiveness of the remaining provisions or applications and, to this end, the provisions of this Ordinance are severable.
SECTION 19. Publication. The City Clerk is directed to certify the passage and adoption of this Ordinance; cause it to be entered into the City of Bellflower’s book of original ordinances; make a note of the passage and adoption in the records of this meeting; and, within 15 days after the passage and adoption of this Ordinance, cause it to be published or posted in accordance with California law.
SECTiON 20. Effective Date. This Ordinance will become effective 30 days after adoption, however the provisions herein shall not become operative until January 1, 2026. Projects for which a building permit application and building plans are submitted before the effective date of this Ordinance, and for which building permits are obtained within 90 days from the effective date of this Ordinance, are exempt from the regulations in the 2025 code update including the codes adopted by reference in this Ordinance.
Should, however, the building permit expire, all building plans must comply with this Ordinance.
SECTION 21. Filing with Building Standards Commission. The City Clerk must file a certified copy of this Ordinance with the California Building Standards Commission.
-53-
City of BeIIflower
Ordinance No. 1449
ORDINANCE NO. 1449 HAD ITS FIRST READING ON SEPTEMBER 3, 2025, ITS SECOND READING ON SEPTEMBER 22, 2025, AND WAS DULY PASSED,
APPROVED, AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF BELLFLOWER AT ITS REGULAR MEETING OF SEPTEMBER 22, 2025.
Ray Dunton, Mayor
ATTEST:
Mayra Ochiqui, City Clerk
APPROVED AS TO FORM:
Karl H. Berger, City Attorney
-54-
BELL
“if Staft'eport
TO: Honorable Mayor and Members of the City Council
ATTENTION: Ryan Smoot, City Manager
FROM: Elizabeth Oba, Director of Planning and Building Services Alan Cook, Building Official
SUBJECT: Consideration and possible action to 1) read by title only, waive further reading and introduce Ordinance No. 1449 — An Ordinance adopting the 2025 Editions of the California Building Code, the California Residential Code, the California Electrical Code, the California Mechanical Code, the California Plumbing Code, the California Energy Code, the California Fire Code, the California Existing Building Code, the California Wildland-Urban Interface Code, the California Green Building Standards Code, the California Referenced Standards Code, and the California Building Standards Administrative Code; making certain amendments based upon local conditions, and amending the Bellflower Municipal Code to reflect such changes; and 2) setting a public hearing for September 22, 2025 for second reading and adoption of the Ordinance.
DATE: September 3, 2025
EXECUTIVE SUMMARY
The 2025 California Building Standards Code (“CBSC”) takes effect on January 1, 2026.
These are part of the uniform codes imposed by the California Legislature every three years via Title 24 of the California Code of Regulations. Health and Safety Code §17958 allows local governments to amend the CBSC based upon local climatic, topographical, and geological conditions, or for administrative reasons.
The Planning Department, including the Building and Safety Division, is proposing amendments to the Bellflower Municipal Code relating to building code regulations for the purpose of complying with State requirements and to update current administrative and technical standards. The last code adoption with amendments to the Bellfiower Municipal Code relating to building code regulations was December 22, 2022.
This Ordinance would amend portions of the proposed 2025 CBSC and adopt the 2025 Edition of the CBSC. The most significant changes with the 2025 Edition of the CBSC relate to the Energy Code regulations and include, without limitation, changes to solar roofing products, fire sprinkler protection, and where electric vehicles are stored or repaired. In addition, this ordinance includes requirements for minimum Class B roofing materials, increased foundation minimum requirements due to the soil liquefaction potential, and administrative modifications including changes to the permit and plan check expiration. Lastly, this ordinance includes the new California Wildland-Urban Interface Code.
-6 5-
Staff Report - 2025 CBSC; Ordinance No. 1449
September 3, 2025
RECOMMENDATION TO CITY CQLINCIL
1) Read by title only, waive further reading, and introduce Ordinance No. 1449; and 2) Set a public hearing for the September 22, 2025, City Council Meeting for second reading and possible adoption of the Ordinance; or
3) Alternatively, discuss and take other action related to this item.
FISCAL IMPACT
The cost to administer implementation of the 0380 is recovered via Building Division permit fees.
PUBLIC NOTICE
For the adoption of building codes by reference, California law requires that the second reading of the Ordinance be noticed as a public hearing. Accordingly, if the City Council follows staff’s recommendation to set a public hearing for September 22, 2025, legal notice wilt be published on September 5 and September 12. 2025, in the Los Cerritos Community News newspaper.
ENVIRONMENTAL ASSESSMENT 7
This Ordinance is exempt from review under the California Environmental Quality Act (Public Resources Code §§ 21000, et seq., “CEQA") and the regulations promulgated thereunder (14 California Code of Regulations §§ 15000, et seq., the “CEQA Guidelines’) because it consists only of minor revisions and clarifications to an existing code of construction-related regulations and specification of procedures. These will not have the effect of deleting or substantially changing any regulatory standards or findings.
Accordingly, the Ordinance (by itself) does not have the potential to cause significant effects on the environment. In addition, this Ordinance is an action being taken for enhanced protection of the environment and is exempt from further review under CEQA Guidelines § 15308.
DISCUSSION
The California Building Standards Commission is authorized by the California Building Standards Law (Health and Safety Code §§ 18901 through 18949.31) to administer the processes related to the adoption, approval, publication, and implementation of California’s building codes.
California Code of Regulations Title 24, also known as the CBSC, is a compilation of three types of building criteria from three origins:
0 Building standards that have been adopted by state agencies with change from building standards contained in national model codes;
-66-
Staff Report - 2025 CBSC; Ordinance No. 1449
September 3, 2025
DISCUSSION — Continued
0 Building standards that have been adopted and adapted from the national model code standards to meet California conditions; and
0 Building standards, authorized by the California legislature, that constitute extensive additions not covered by the model codes that have been adopted to address particular California concerns.
Since 1989, the Commission has published triennial editions of Title 24 in their entirety.
These building codes are comprised of 12 parts containing the regulations that govern and serve as the basis for the design and construction of ali buildings and structures in California.
Effective July 1, 2025, AB 130 restricts the City’s ability to make iocal amendments to the California Codes. Beginning October 1, 2025 to June 1, 2031, a city cannot make additional local amendments to these codes that regulate residential units. This creates a limited window for the code adoption process while ensuring the City’s ability to continue current enforcement practices.
California law requires that the City Council conduct a public hearing before second reading of ordinances that adopt the CBSC by reference. The Director recommends that the City Council set a public hearing for the second reading of the Ordinance at its September 22, 2025 meeting.
The most significant changes with the 2025 Edition of the CBSC relate to the Energy Code regulations, which include without limitation, changes to solar roofing products, fire sprinkler protection for various occupancies where Lithium type batteries are manufactured, tested, stored, and where electric vehicles are stored or repaired. This ordinance also includes requirements for minimum Class B roofing materials, increased ‘ foundation minimum requirements due to the soil liquefaction potential, and administrative modifications including changes to the permit and plan check expiration. Also included in the Ordinance is the City Council’s ongoing decision to adopt and implement the CFC rather than regulations proposed by the Fire Protection District. Lastly, the Building Standards Commission added a new California Wildland-Urban interface Code as Title 7 in Title 24 of the California Code of Regulations, which replaces chapter 7A of the Building Code, and is included in this ordinance.
The recommended action includes amending Title 15 of the Bellflower Municipal Code by adopting the 2025 Edition of the CBSC. In considering such action, the City Council acts in its discretionary legislative capacity (formulating rules that apply to all future cases).
For the proposed amendments, the City Council must find that they are reasonably necessary because of local climatic, geological or topographical conditions (Health and Safety Code § 17958.7). These findings, and the facts upon which they rely, are included within the draft Ordinance.
-67-
Staff Report - 2025 C380; Ordinance No. 1449
September 3, 2025
DISCUSSION — Continued
Projects for which a building permit application and building plans were submitted before the Ordinance’s effective date, and for which building permits are obtained within 90 days of the effective date, are exempt from the updated regulations in the the Ordinance.
Should, however, the building permit expire, all building plans must comply with the updated regulations.