14-D
TO: Honorable Mayor and Members of the City Council
ATTENTION: Ryan Smoot, City Manager
FROM: Len Gorecki, Assistant City Manager/Director of Public Works Sarah Ho, Public Works Manager
SUBJECT: Consideration and possible action to authorize the City Manager to execute the Third Amendment to Memorandum of Understanding No. 15 for the Los Cerritos Channel Watershed (MOU No. 15) and the Third Amendment to Memorandum of Understanding No. 17 for the Lower San Gabriel River Watershed (MOU No. 17) with the Gateway Region Integrated Water Management Joint Powers Authority (“GWMA”) for the administration and cost sharing to prepare and implement Watershed Management Programs
(“WMPs”) and Coordinated Integrated Monitoring Programs (“CIMPs”) for the Los Cerritos Channel and the Lower San Gabriel River Watersheds.
Date: October 13, 2025
EXECUTIVE SUMMARY
This action would authorize the City Manager to execute the Third Amendment to MOU Nos. 15 and 17 with the GWMA for administration and cost sharing to prepare and implement WMPs and CIMPs for the Los Cerritos Channel (“LCC”) and Lower San Gabriel River (“LSGR”) Watersheds, as required by the Municipal Separate Storm Sewer System (“MS4”) Permit. The term of each respective MOU would be extended through September 30, 2030.
RECOMMENDATION TO CITY COUNCIL
1) Authorize the City Manager to execute the Third Amendment to MOU Nos. 15 and 17, in a form approved by the City Attorney; or
2) Alternatively, discuss and take other action related to this item.
FISCAL IMPACT
The average annual cost for both programs is approximately $150,000 . Funding for each program is included in the Public Works Maintenance and Operations Budget for FY 2025-27 under Account No. 320-41200-6020 (Measure W – Safe Clean Water Program Funds).
F BELLF
{vi 0 LOVVEQ
% Stmieport
Staff Report – Third Amendment of MOU Nos. 15 and 17
October 13, 2025
DISCUSSION
The City of Bellflower is located in two separate drainage watersheds; the L os Cerritos Channel (“LCC”) Watershed and the Lower San Gabriel River (“LSGR”) Watershed; therefore, the storm drain system that services the City drains to these two watersheds.
The MS4 Permit requires that Bellflower, along with other cities located within these watersheds, develop WMPs and CIMPs for each watershed.
In 2013, the City entered into MOU No. 15 with the GWMA for the preparation of the LCC WMPs and CIMPs, participating with 7 other cities/agencies (Cerritos, Downey, Lakewood, Long Beach, Paramount and Signal Hill, and the L.A. County Flood Control District), as part of the Los Cerritos Channel Watershed Group. The same year, the City entered into MOU No. 17 with the GWMA for the preparation of the LSGR WMPs and CIMPs, participating with 13 other cities/agencies (Artesia, Cerritos, Diamond Bar, Downey, Hawaiian Gardens, Lakewood, La Mirada, Long Beach, Norwalk, Pico Rivera, Santa Fe Springs, Whittier and the L.A. County Flood Control District), as part of the Lower San Gabriel River Watershed Committee. This multi-agency approach in obtaining compliance has been more cost effective rather than addressing these regulatory requirements separately as individual permittees.
Previous amendments to both MOU’s in 2015 and 2020 have extended the term of the agreements. The third amendment of each respective MOU will extend the term through September 30, 2030, and will continue to establish a cost share formula of 90% of cost based on land area in the watershed and 10% of cost based on a proportioned equal share for all participating cities. The amendment for MOU 17 updates the cost share formula. The annual contribution for these MOU amendments will vary depending on the required monitoring and special studies needed to comply with the MS4 Permit. The average annual costs for each MOU over the past 5 years are as follows: MOU No. 15:
$127,000 and MOU No. 17: $23,000 for a total of approximately $150,000.
ATTACHMENT
Third Amendment to MOU No. 15 ..................................................................................... ……...3 Third Amendment to MOU No. 17 ............................................................................................. 14
LCC
July 2025
1 THIRD AMENDMENT TO THE MEMORANDUM OF UNDERSTANDING
BETWEEN THE LOS ANGELES GATEWAY REGION INTEGRATED REGIONAL
WATER MANAGEMENT JOINT POWERS AUTHORITY AND THE CITIES OF BELLFLOWER,
CERRITOS, DOWNEY, LAKEWOOD, LONG BEACH, PARAMOUNT, AND SIGNAL HILL, AND
THE LOS ANGELES COUNTY FLOOD CONTROL DISTRICT
FOR
ADMINISTRATION AND COST SHARING TO PREPARE AND IMPLEMENT A WATERSHED
MANAGEMENT PROGRAM AND COORDINATED INTEGRATED MONITORING PROGRAM AS
REQUIRED BY THE REGIONAL WATER QUALITY CONTROL BOARD, LOS ANGELES REGION,
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM MUNICIPAL SEPARATE STORM SEWER SYSTEM PERMIT ORDER NO. R4-2021-0105 MUNICIPAL SEPARATE
STORM SEWER SYSTEM
This THIRD AMENDMENT to the memorandum of understanding (“MOU”) is made and entered into as of the date of the last signature set forth below, by and between the Los Angeles Gateway Region Integrated Regional Water Management Joint Powers Authority (“GWMA”), a California Joint Powers Authority, and the Cities of Bellflower, Cerritos, Downey, Lakewood, Long Beach, Paramount, and Signal Hill (“Cities”), and the Los Angeles County Flood Control District (“LACFCD”):
1. Recitals. This THIRD AMENDMENT is made with the respect to the following facts and purposes:
A. For the purposes of this Third Amendment, the term “Watershed Permittees” shall mean the Cities of Bellflower, Cerritos, Downey, Lakewood, Long Beach, Paramount, and Signal Hill, and the Los Angeles County Flood Control District; and
B. The Watershed Permittees and GWMA are collectively referred to as the “Parties”; and
C. The Los Cerritos Watershed Group (“Group”) is the technical committee comprised of one representative from each of the Watershed Permittees.
D. On December 6, 2013, the Parties entered into a Memorandum of Understanding between the Los Angeles Gateway Region Integrated Regional Water Management Joint Powers Authority and the Cities of Bellflower, Cerritos, Downey, Lakewood, Long Beach, Paramount, and Signal Hill, and the Los Angeles County Flood Control District for Administration and Cost Sharing to Prepare a Watershed Management Program (“WMP”) and a Coordinated Integrated Monitoring Program (“CIMP”), collectively the “Plans,” as required by the Regional Water Quality Control Board, Los Angeles Region (“Regional Board”), National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Permit, Order No. R4-2012-0175 Municipal Separate Storm Sewer System (“MS4 Permit”); and
3 LCC
July 2025
2 E. The Watershed Permittees prepared and submitted the Plans to the Regional Board in compliance with certain provisions of the MS4 Permit; and
F. In 2021, the Regional Board re-adopted the MS4 Permit by Order No. R4- 2021-0105. This version of the MS4 Permit included similar WMP and CIMP provisions; and
G. The Watershed Permittees are implementing the Plans in accordance with the MS4 Permit; and
H. The Parties have determined that authorizing GWMA to continue its retention of a consultant to implement the Plans will be beneficial to the Parties; and
I. On April 17, 2015, the Parties entered into the First Amendment to the MOU in order to: (1) add implementation of the Plans to the scope and purpose of the MOU; and (2) provide a separate cost-share formula for the implementation of the Plans, subject to annual budget approval, in accordance with each Party’s cost share allocations; and
J. On July 9, 2020, the Parties entered into the Second Amendment to the MOU in order to (1) extend the MOU’s term through September 30, 2025; (2) incorporate GWMA’s administrative cost recovery program into the MOU; and (3) provide a consolidated cost-share formula for implementation of the Plans and any other approved expenditures, subject to annual budget approval; and
K. The Parties now desire to amend the MOU to extend the MOU’s term through September 30, 2030.
NOW, THEREFORE, the Parties agree that the following provisions of the MOU shall be amended as follows:
2. Section 1 of the MOU entitled “Recitals” is hereby amended by adding thereto Recitals A-K of Section 1 of this Third Amendment, which are set forth above and incorporated herein as though set forth in full.
3. Section 6 of the MOU entitled “Term” is hereby amended to read as follows:
“Section 6. Term. This MOU shall remain and continue in effect until September 30, 2030, unless sooner terminated as provided herein. ”
4. Except for the changes specifically set forth herein, all other terms and conditions of the MOU and First and Second Amendments shall remain in full force and effect.
[SIGNATURE PAGES FOLLOW]
4 LCC
July 2025
3 IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _____________________ LOS ANGELES GATEWAY REGION INTEGRATED
REGIONAL WATER MANAGEMENT JOINT
POWERS AUTHORITY
_______________________________________
Adriana Figueroa
GWMA Chair
_______________________________________
Nicholas R. Ghirelli
General Counsel
5 LCC
July 2025
4 IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF BELLFLOWER
City Manager
16600 Civic Center Drive
Bellflower, CA 90706
_____________________________
_____________________________
City Manager
ATTEST: APPROVED AS TO FORM:
_____________________________ ______________________________ _____________________________ ______________________________ City Clerk City Attorney
6 LCC
July 2025
5 IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF CERRITOS
City Manager
P.O. Box 3130
Cerritos, CA 90703-3130
_____________________________
_____________________________
City Manager
ATTEST: APPROVED AS TO FORM:
_____________________________ ______________________________ _____________________________ ______________________________ City Clerk City Attorney
7 LCC
July 2025
6 IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF DOWNEY
City Manager
11111 Brookshire Avenue
Downey, CA 90241
_____________________________
_____________________________
City Manager
ATTEST: APPROVED AS TO FORM:
_____________________________ ______________________________ _____________________________ ______________________________ City Clerk City Attorney
8 LCC
July 2025
7 IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF LAKEWOOD
City Manager
5050 Clark Avenue
Lakewood, CA 90712
_______________________________
_______________________________
Mayor
ATTEST: APPROVED AS TO FORM:
_____________________________ ______________________________ _____________________________ ______________________________ City Clerk City Attorney
9 LCC
July 2025
8 IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: ______________ CITY OF LONG BEACH
City Manager
333 West Ocean Boulevard, 13th Floor
Long Beach, CA 90802
_______________________________
_______________________________
City Manager
ATTEST: APPROVED AS TO FORM:
_____________________________ ______________________________ _____________________________ ______________________________ City Clerk City Attorney
By: ________________________________
Deputy City Attorney
10 LCC
July 2025
9 IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF PARAMOUNT
City Manager
16400 Colorado Avenue
Paramount, CA 90723
_______________________________
_______________________________
City Manager
ATTEST: APPROVED AS TO FORM:
_____________________________ ______________________________ _____________________________ ______________________________ City Clerk City Attorney
11
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF SIGNAL HILL
City Manager
2175 Cherry Avenue
Signal Hill, CA 90602
_______________________________
_______________________________
City Manager
ATTEST: APPROVED AS TO FORM:
_____________________________ _______________________________ _____________________________ _______________________________ City Clerk City Attorney
12
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _____________ LOS ANGELES COUNTY FLOOD
CONTROL DISTRICT
County of Los Angeles
Department of Public Works
By: _______________________________
Chief Engineer
APPROVED AS TO FORM:
________________________________
Dawyn R Harrison
County Counsel
________________________________
Deputy
13 LSGR
July 2025
THIRD AMENDMENT TO THE MEMORANDUM OF UNDERSTANDING
BETWEEN THE LOS ANGELES GATEWAY REGION INTEGRATED REGIONAL
WATER MANAGEMENT JOINT POWERS AUTHORITY AND
THE CITIES OF ARTESIA, BELLFLOWER, CERRITOS, DIAMOND BAR, DOWNEY,
HAWAIIAN GARDENS, LA MIRADA, LAKEWOOD, NORWALK, PICO RIVERA, SANTA
FE SPRINGS, WHITTIER, LONG BEACH, AND THE LOS ANGELES COUNTY FLOOD
CONTROL DISTRICT
FOR
ADMINISTRATION AND COST SHARING TO PREPARE AND IMPLEMENT A
WATERSHED MANAGEMENT PROGRAM AND COORDINATED INTEGRATED
MONITORING PROGRAM AS REQUIRED BY THE REGIONAL WATER QUALITY
CONTROL BOARD, LOS ANGELES REGION, NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM MUNICIPAL SEPARATE STORM SEWER SYSTEM PERMIT ORDER NO. R4-2021-0105 MUNICIPAL SEPARATE STORM SEWER SYSTEM
This THIRD AMENDMENT to the memorandum of understanding (“MOU”) is made and entered into as of the date of the last signature set forth below, by and between the Los Angeles Gateway Region Integrated Regional Water Management Joint Powers Authority (“GWMA”), a California Joint Powers Authority, and the Cities of Artesia, Bellflower, Cerritos, Diamond Bar, Downey, Hawaiian Gardens, La Mirada, Lakewood, Norwalk, Pico Rivera, Santa Fe Springs, Whittier, Long Beach (“Cities”), and the Los Angeles County Flood Control District (“LACFCD”):
1. Recitals. This THIRD AMENDMENT is made with respect to the following facts and purposes:
A. For the purposes of this Third Amendment, the term “Watershed Permittees” shall mean the Cities of Artesia, Bellflower, Cerritos, Diamond Bar, Downey, Hawaiian Gardens, La Mirada, Lakewood, Norwalk, Pico Rivera, Santa Fe Springs, Whittier, Long Beach, and the Los Angeles County Flood Control District; and
B. The Watershed Permittees and GWMA are collectively referred to as the “Parties”; and
C. On August 1, 2013, the Parties entered into a Memorandum of Understanding between the Los Angeles Gateway Region Integrated Regional Water Management Joint Powers Authority and the Cities of Artesia, Bellflower, Cerritos, Diamond Bar, Downey, Hawaiian Gardens, La Mirada, Lakewood, Norwalk, Pico Rivera, Santa Fe Springs, Whittier, Long Beach, and the Los Angeles County Flood Control District for Administration and Cost Sharing to Prepare a Watershed Management Program (“WMP”) and Coordinated Integrated Monitoring Program (“CIMP”), collectively the “Plans,” as required by the Regional Water Quality Control Board, Los Angeles Region (“Regional Board”), National Pollutant Discharge 14 LSGR
July 2025
Elimination System Municipal Separate Storm Sewer System Permit, Order No. R4- 2012-0175 Municipal Separate Storm Sewer System (“MS4 Permit”); and
D. The Watershed Permittees prepared and submitted the Plans to the Regional Board in compliance with certain provisions of the MS4 Permit; and
E. In 2021, the Regional Board re-adopted the MS4 Permit by Order No.
R4-2021-0105. This version of the MS4 Permit included similar WMP and CIMP provisions; and
F. The Watershed Permittees are implementing the Plans in accordance with the MS4 Permit; and
G. The Parties have determined that authorizing GWMA to continue its retention of a consultant to implement the Plans will be beneficial to the Parties; and
H. The Parties entered into the First Amendment to the MOU in order to:
(1) add implementation of the Plans to the scope and purpose of the MOU; and (2) provide a separate cost-share formula for the implementation of the Plans, subject to annual budget approval, in accordance with each Party’s cost share allocations; and
I. On July 9, 2020, the Parties entered into the Second Amendment to the MOU in order to: (1) extend the MOU’s term through September 30, 2025; (2) clarify that funding collected through this MOU may be used for the regional BMP projects agreed to by the Watershed Permittees; (3) incorporate GWMA’s administrative cost recovery program into the MOU; and (4) provide a consolidated cost-share formula for implementation of the Plans and any other approved expenditures, subject to annual budget approval; and
J. The Parties now desire to amend the MOU to extend the MOU’s term through September 30, 2030.
NOW, THEREFORE, the Parties agree that the following provisions of the MOU shall be amended as follows:
2. Section 1 of the MOU entitled “Recitals” is hereby amended by adding thereto Recitals A-I of Section 1 of this Third Amendment, which are set forth above and incorporated herein as though set forth in full.
3. Section 6 of the MOU entitled “Term” is hereby amended to read as follows:
“Section 6. Term. This MOU shall remain and continue in effect until September 30, 2030, unless sooner terminated as provided herein.”
15 LSGR
July 2025
4. Exhibit “B” (“Annual Average Cost Sharing Formula beginning FY July 1, 2025”) attached hereto and incorporated herein as though set forth in full shall replace “Exhibit “B (“Cost Sharing Formula”) previously adopted under the Second Amendment.
5. Except for the changes specifically set forth herein, all other terms and conditions of the MOU and the First and Second Amendments shall remain in full force and effect.
[SIGNATURE PAGES FOLLOW]
16 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _____________________ LOS ANGELES GATEWAY REGION
INTEGRATED REGIONAL WATER
MANAGEMENT JOINT POWERS
AUTHORITY
_______________________________________
Adriana Figueroa
GWMA Chair
_______________________________________
Nicholas R. Ghirelli
General Counsel
17 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF ARTESIA
City Manager
18747 Clarkdale Avenue
Artesia, CA 90701
_____________________________
_____________________________
City Manager
ATTEST: APPROVED AS TO FORM:
_______________________________ ______________________________ _______________________________ ______________________________ City Clerk City Attorney
18 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF BELLFLOWER
City Manager
City of Bellflower
16600 Civic Center Drive
Bellflower, CA 90706
_____________________________
_____________________________
City Manager
ATTEST: APPROVED AS TO FORM:
_____________________________ ______________________________ ______________________________ ______________________________ City Clerk City Attorney
19 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF CERRITOS
City Manager
P.O. Box 3130
Cerritos, CA 90703-3130
_______________________________
_______________________________
City Manager
ATTEST: APPROVED AS TO FORM:
______________________________ ______________________________ ______________________________ ______________________________ City Clerk City Attorney
20 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF DIAMOND BAR
City Manager
21810 Copley Drive
Diamond Bar, CA 91765
______________________________
______________________________
City Manager
ATTEST: APPROVED AS TO FORM:
_________________________ ______________________________ _________________________ ______________________________ City Clerk City Attorney
21 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF DOWNEY
City Manager
11111 Brookshire Avenue
Downey, CA 90241
_____________________________
_____________________________
City Manager
ATTEST: APPROVED AS TO FORM:
_____________________________ ______________________________ _____________________________ ______________________________ City Clerk City Attorney
22 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: ______________ CITY OF HAWAIIAN GARDENS
City Manager
21815 Pioneer Blvd
Hawaiian Gardens, CA 90716
________________________________
________________________________
City Manager
ATTEST: APPROVED AS TO FORM:
__________________________ ______________________________ __________________________ ______________________________ City Clerk City Attorney
23 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: ____________ CITY OF LA MIRADA
City Manager
13700 La Mirada Blvd
La Mirada, CA 90638
_______________________________
_______________________________
City Manager
ATTEST: APPROVED AS TO FORM:
______________________________ ______________________________ ______________________________ ______________________________ City Clerk City Attorney
24 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF LAKEWOOD
City Manager
5050 Clark Avenue
Lakewood, CA 90712
_______________________________
_______________________________
City Manager
ATTEST: APPROVED AS TO FORM:
_________________________ ______________________________ _________________________ ______________________________ City Clerk City Attorney
25 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: ______________ CITY OF LONG BEACH
City Manager
333 West Ocean Boulevard, 13th Floor
Long Beach, CA 90802
_______________________________
_______________________________
City Manager
ATTEST: APPROVED AS TO FORM:
______________________________ ______________________________ ______________________________ ______________________________ City Clerk City Attorney
______________________________
Deputy City Attorney
26 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF NORWALK
City Manager
12700 Norwalk Blvd
Norwalk, CA 90650
________________________________
________________________________
City Manager
ATTEST: APPROVED AS TO FORM:
__________________________ ______________________________ __________________________ ______________________________ City Clerk City Attorney
27 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF PICO RIVERA
City Manager
6615 Passons Boulevard
Pico Rivera, CA 90660
________________________________
________________________________
City Manager
ATTEST: APPROVED AS TO FORM:
____________________________ ________________________________ ____________________________ ________________________________ City Clerk City Attorney
28 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF SANTA FE SPRINGS
City Manager
11710 Telegraph Road
Santa Fe Springs, CA 90670
_______________________________
_______________________________
City Manager
ATTEST: APPROVED AS TO FORM:
_________________________ ______________________________ _________________________ ______________________________ City Clerk City Attorney
29 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _______________ CITY OF WHITTIER
City Manager
13230 Penn Street
Whittier, CA 90602
_______________________________
_______________________________
City Manager
ATTEST: APPROVED AS TO FORM:
______________________________ _______________________________ ______________________________ _______________________________ City Clerk-Treasurer City Attorney
30 LSGR
July 2025
IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:
DATE: _____________ LOS ANGELES COUNTY FLOOD
CONTROL DISTRICT
County of Los Angeles
Department of Public Works
By: _______________________________
Chief Engineer
APPROVED AS TO FORM:
________________________________
Dawyn R Harrison
County Counsel
________________________________
Deputy
31 Exhibit B
Annual Average Cost Sharing Formula beginning FY July 1, 2025
Agency Area
(sq. mile)
Cost Share
Percentage
90% of Average Cost
(after Deducting
LACFCD’s Cost)
Proportioned Based
on Area
10% of Average
Cost (after
Deducting
LACFCD’s Cost)
Proportioned
Equally
Total Average
Annual Cost*
Artesia 1.62 1.85% $12,777.67 $5,903.29 $18,680.96
Bellflower 1.90 2.17% $14,987.86 $5,903.29 $20,891.15
Cerritos 8.82 10.09% $69,690.10 $5,903.29 $75,593.39
Diamond Bar 14.89 17.03% $117,623.63 $5,903.29 $123,526.92 Downey 6.62 7.57% $52,284.84 $5,903.29 $58,188.13
Hawaiian Gardens 0.96 1.10% $7,597.53 $5,903.29 $13,500.82 La Mirada 7.84 8.97% $61,954.43 $5,903.29 $67,857.72
Lakewood 2.02 2.31% $15,954.82 $5,903.29 $21,858.11
Long Beach 3.34 3.82% $26,384.16 $5,903.29 $32,287.45
Norwalk 9.76 11.16% $77,080.43 $5,903.29 $82,983.72
Pico Rivera 6.14 7.02% $48,486.08 $5,903.29 $54,389.36
Santa Fe Springs 8.88 10.15% $70,104.51 $5,903.29 $76,007.80 Whittier 14.66 16.76% $115,758.78 $5,903.29 $121,662.07 LACFCD (5% of total) -- $34,135.40 -- $34,135.40
Total 87.45 100.00% $724,820.24 $76,742.76 $801,563.00
* Does not include GWMA Administrative Fee and Indirect Administrative Fee (approved by GWMA Board annually).
Notes:
• The LSGR Watershed Group will determine and approve a budget each year for the following fiscal year necessary to comply with the MS4 permit(s).
• The average Watershed budget for the next four years is anticipated to range between $656,984.85 and $795,297.45, (Average = $726,141.15) depending on the potential for a new regional MS4 Permit to go in effect, plus GWMA administrative fees. The current MS4 Permit is scheduled to expire on September 11, 2026. The watershed budgets may be higher if reassessments of the Watershed Management Program (WMP), the Coordinated Integrated Monitoring Program (CIMP), and the Reasonable Assurance Analysis (RAA) are required for the new Permit.
• Other agencies may participate upon approval of cost sharing agreements by the LSGR Watershed Committee and GWMA. Future participants shall be assessed a late entry cost as if they had been a participant from the beginning of the Metals TMDL MOU, as of March 1, 2012, unless otherwise determined by the LSGR Watershed Committee.
• Watershed Permittees and the cost share are subject to modifications due to, but not limited to, changes in the number of participating agencies, refinements in mapping, and changes in boundaries.
• LACFCD’s annual contribution shall not exceed $100,000 unless otherwise amended.
32