MAY 11, 2026 PEDESTRIAN
COKE AVENUE DESIGN UPDATE of a lease by the Los Angeles City Council.negotiation of the existing land use lease with the nursery and the final approval -reinternal design review, negotiations for cost and terms for the necessary easement, 3 years) as it includes their -approval for construction is 30 to 36 months (2 ½ Second, if it were approved, the estimated timeframe from design submittal to final radius and likely would not be approved for construction.foot -transmission tower footing. The proposed sidewalk would be within this 50foot radius of each -First, LADWP does not allow any new construction within a 50major issues associated with our requestregarding the matter. From that meeting, LADWP staff informed the City of two On 4/21/26 PW staff and the Willdan design met with LADWP Real Estate Division lanes on Coke Ave.for space to place the new sidewalk to avoid narrowing the vehicle travel way to -of-regarding the possibility of utilizing some of the existing LADWP rightAt the 1/26/26 meeting, City Council directed PW staff to reach out with LADWP
5 curb lines curb ramps at all intersections, particularly at Coke/Rose.west side of Coke Ave. adjacent to LADWP/nursery fence line and establish defined The project will clean up the –Improve Quality of Life & Visual Appeal in the City 4.connect adjacent street sidewalks to Coke Ave.walk along Coke Ave, establish ADA compliant sidewalks and curb ramps and Proposed improvements will allow pedestrians to safely –Enhance Public Safety 1.Strategic Plan Objectives$400,000 for construction-27 -FY 26$150,000 for design-26 -FY 2527 budgeting sessions-City Council during FY 25As part of the City’s CIP Program, the Coke Avenue project was approved by Way Improvements (51611)--Pedestrian RightYEAR CIP PROGRAM-
COKE AVENUE DESIGN PARAMETERS outs” to be -(Artesia Blvd.) to south (Rose St.). This would allow for pedestrian “bulbway road with vehicle direction moving from the north -convert Coke Ave. into a oneTo enhance pedestrian crossings at each intersection, this option would –Option 2 compliant pedestrian curb ramps.-each intersection would include ADAwhere sidewalk and appropriate curb & gutter will be constructed on the west side and Typical street design with a single travel lane in each direction (north & south) –Option 1 Willdan has presented 2 design options for considerationLADWP/nursery boundary.most viable path for sidewalk installation is the west side adjacent to Due to varying properties lines, tree and utility conflicts along the east side, the project.City partnered with Willdan Engineering to determine the best suited design for the
OPTION 1 -TWO–
ONE OUT -WAY w/ BULB-ONE–OPTION 2 WAY
STREET VIEW SOUTH OF ROSE STREET–
RECOMMENDED ACTION Alternatively, discuss and take other action Limit; orbetween Artesia Boulevard and the south City installation of sidewalk on Coke Avenue Approve one of the two design options for the
JANUARY 26, 2026 IMPROVEMENTSPEDESTRIAN COKE AVENUE
Artesia Blvd to south City LimitCedar Street to Cedar Street