© 2016 HDR, Inc., all rights reserved.

Proposed 2025
Solid Waste Rates
September 10, 2024
Overview of the Presentation
2 Review Franchise Agreement and
Rate Setting Process
Review of 2025 Rate Application
Proposed 2025
Schedule L and Schedule Q Rates
 Rate year 2025 is fifth year of the amended and
extended Agreement
 Rate setting process:
o Each July, Recology calculates the “maximum rates” for scheduled and additional services
o Recology’s data and information is independently audited o City and HDR independently review calculations of
“maximum rates”
o City adopts solid waste rates that do not exceed the
Contractor’s calculated “maximum” rates
 The calculation of “maximum rates” is formula-driven
and specified in the Section 11 of the Agreement
Overview of Franchise Agreement and Rate Setting
Process
3 Rate Year 2025 Application
4  Base Contractor’s increase 3.63%
o Base contractor “component” CPI
index adjustments
 Pass-Thru increase 0.41%
o Disposal and Agency costs
 2025 Adjustment Multiplier
o (2025 Total Target Revenue ÷
2024 Total Target Revenue) - 1 = 2.04%
o Summary of component to 2025 rates
2024 2025 $ %
Target Rev. Target Rev. Difference Difference
Base Contractor's Compensation
Direct Labor Related $2,382,648 $2,455,457 $72,808 3.06% Direct Fuel Costs 287,249 322,119 34,870 12.14%
General Expense Direct & Indirect 1,393,783 1,446,287 52,503 3.77% Depreciation 281,317 281,317 0 0.00%
Profit 456,105 472,919 16,815 3.69%
Interest 73,679 73,679 0 0.00%
Total Base Contractor's Comp. $4,874,782 $5,051,777 $176,996 3.63% Performance (Inc.)/Dis. (6,147) (4,487) 1,660 -27.01%
Pass-Thru Costs
Disposal Projected Cost (i) $2,241,715 $2,434,527 $192,812 8.60% Disposal Actual Prior Year Cost (ii) 1,843,054 2,114,505 271,451 14.73% Disposal Prior Projected Cost (iii) (1,745,620) (2,241,715) (496,095) 28.42% Net Disposal Cost Component $2,339,149 $2,307,317 ($31,832) -1.36% Agency Payments 2,532,464 2,584,050 51,587 2.04%
Total Pass-Through Costs $4,871,613 $4,891,367 $19,755 0.41% Total Target Revenue $9,740,247 $9,938,658 $198,410 2.04% Plus Disincentive Payable 0 0 0 0.00%
Total Target Revenue $9,740,247 $9,938,658 $198,410 2.04% 2025 Rate Application
Cost Component
Component 2024 2025 $ Diff. Rate Change
Base Contractor $4,874,782 $5,051,777 $176,996 1.82%
Pass Thru/Disc./Inc. 4,865,466 4,886,880 21,415 0.22%
Total Target $9,740,247 $9,938,658 $198,410 2.04%
Belmont History of Solid Waste Rates by Component
5 Proposed 2025 Residential Rates By Cart Size ($/Month) 6 6
Schedule Schedule Description
Present
Rates
Proposed
2025 Rates
$ / Month
Change
R20G Residential Waste – 20 Gallons $40.21 $41.03 $0.82 R32G Residential Waste – 32 Gallons 47.97 48.95 0.98
R64G Residential Waste – 64 Gallons 94.43 96.36 1.93
R96G Residential Waste – 96 Gallons 141.65 144.54 2.89
Overview of Schedule Q (Additional Services)
Calculations of “Maximum” Rates
7  Schedule Q is related to additional services (e.g., extra pickup, community dropoff events, etc.)  Schedule Q uses a different rate index than Schedule L for its annual adjustments  Schedule Q adjusted annually by CPI-U General formula 2024 calculation for 2025 rates = (April 2024 CPI-U/April 2023 CPI-U = % adjustment) o 2025 rate is a 3.77% increase over 2024 rates
Recommendation and Council Discussion
8  HDR and the City have independently reviewed the study and concluded that the resulting maximum rates for 2025 were calculated in a manner consistent with the Agreement
o Schedule L – Maximum rate adjustment multiplier is 2.04% o Schedule Q – Additional Services are proposed to increase by the CPI-U General calculation of 3.77%
 HDR would recommend:
o The City move forward with the Proposition 218 process for the proposed 2025 rates o Set a Public Protest Hearing date for November 12, 2024 Proposed 2025
Schedule L and
Schedule Q Rates
Proposed 2025 Residential Rates By Cart Size ($/Month)
1 0
10 20 32 64 96
1 Pickup Per Week $41.03 $48.95 $96.36 $144.54
Residential customers are billed based on their Garbage Cart size.

The monthly rate above includes the following:

One (1) Garbage Cart provided to customer
Curbside Household Hazardous Waste Collection
One (1) 64-Gallon Recycling Cart and (1) 96-Gallon Yard Waste Cart

RESIDENTIAL CARTS
Cart Size (in Gallons)
Proposed 2025 Commercial Waste Carts By Cart Size and
Number of Pickups ($/Month)
1 1
11 20 32 64 96
1 $52.35 $58.12 $112.40 $162.46
2 107.69 119.66 226.80 332.78
3 160.34 178.12 344.13 505.02
4 220.12 244.57 462.71 683.13
5 278.50 309.42 588.16 863.66
6 348.47 387.17 716.74 1,087.16
7 424.49 471.64 839.05 1,268.34
The monthly rate above includes the following:

One (1) Garbage Cart
Recycling Cart

COMMERCIAL CARTS
Cart Size (in Gallons)
# of Pickups Per Week
Proposed 2025 Commercial Carts Organics By Cart Size and Number of Pickups ($/Month)
1 2
12 32 64 96
1 $40.71 $78.70 $113.72
2 83.76 158.76 232.94
3 124.68 240.88 353.51
4 171.22 323.92 478.18
5 216.60 411.72 604.56
6 271.05 501.68 761.00
7 330.17 587.33 887.84
Not Organics containers are charged at seventy percent (70%) of the similar Garbage commercial cart rate above container size and service levels for Garbage, representing a thirty percent (30%) discount
Cart Size (in Gallons)
# of Pickups Per Week

COMMERCIAL CARTS ORGANICS
Proposed 2025 Commercial Bins By Bin Size and Number
of Pickups ($/Month)
1 3
13 1 2 3 4 6
1 $272.61 $548.36 $827.02 $1,128.96 $1,736.26
2 555.02 1,105.73 1,664.02 2,277.43 3,521.40
3 842.26 1,668.35 2,505.93 3,425.93 5,293.26
4 1,132.86 2,235.07 3,350.35 4,587.49 7,050.05
5 1,425.79 2,809.79 4,197.69 5,753.95 8,831.87
6 1,779.46 3,317.14 5,095.81 6,968.80 10,676.95
7 2,099.54 3,928.58 6,000.20 8,209.08 12,505.21
The monthly rate above includes the following:

One (1) Garbage Bin
Recycling container at customer's requested size

COMMERCIAL BINS
Bin Size (in Cubic Yards)
# of Pickups Per Week
Proposed 2025 Commercial Bins Organics By Bin Size and
Number of Pickups ($/Month)
1 4
14 1 2 3 4 6
1 $190.84 $383.86 $578.90 $790.28 $1,215.39
2 388.50 773.99 1,164.85 1,594.20 2,464.99
3 589.57 1,167.86 1,754.16 2,398.14 3,705.27
4 793.00 1,564.54 2,345.25 3,211.25 4,935.04
5 998.06 1,966.83 2,938.37 4,027.75 6,182.32
6 1,245.63 2,321.99 3,567.07 4,878.21 7,473.85
7 1,469.69 2,750.01 4,200.14 5,746.36 8,753.64
Not Organics containers are charged at seventy percent (70%) of the similar garbage container size above and service level for garbage, representing a thirty percent (30%) discount
Bin Size (in Cubic Yards)
# of Pickups Per Week

COMMERCIAL BINS ORGANICS
Proposed 2025 Garbage Compactor Rates By Type
($/Month)
1 5
15 Commercial Waste 3 Yard Compactor $1,985.89
Solid Waste Compactor Rate Per Yard $152.78
The monthly fee above includes the following:

Recycling container at customer's requested size

GARBAGE COMPACTORS
Proposed 2025 Schedule Q Rates ($/Month)
1 6
16 No. Additional Service Category Reference
Agency-Approved Maximum
Rate Description
1 Single-Family Dwelling
Backyard Collection Service
Section 5.02.A See Maximum Rate in the table
at the end of this Attachment
See Maximum Rate in the table at
the end of this Attachment
2 Long Distance Service for
MFD, Mixed Use, and
Commercial Accounts (Note:
only applicable to Containers
with wheels)
Section 5.02.B,

5.02.C; 8.02 B
A - No more than 10% of base
monthly Maximum Rate of the
Collection Rate for each
Container requiring Long
Distance Service
B - 25% of base monthly Rate of
the Collection Rate for each
Container requiring Long
Distance Service
A - Distance greater than 50 feet and
less than or equal to 100 feet
B - Distance greater than 100 feet
Distance shall be measured from the
face of the curb, or from the edge of
the roadway nearest the closest edge
of the Container, if there is no curb.

Proposed 2025 Schedule Q Rates ($/Month)
1 7
17 No. Additional Service Category Reference
Agency-Approved Maximum
Rate Description
3 Container Relocation Service Section 5.02.B and

8.02.B
A - 12% of base monthly Rate of
the Collection Rate for each
Container requiring Container
Relocation Service
B - 27% of base monthly Rate of
the Collection Rate for each
Container requiring Container
Relocation Service
A - Distance greater than 50 feet and
less than or equal to 100 feet
B - Distance greater than 100 feet
Distance shall be measured from the
face of the curb, or from the edge of
the roadway nearest the closest edge
of the Container, if there is no curb.
4 On-Call, Pick-up for SFD, MFD,
Mixed Use, and Commercial
Customers
Section 5.02.A,

5.02.B, and 5.02.C
25% of the base monthly Rate for
the size of Container Collected
once per week.

Per Collection event per Container
for Collection requested by Customer
Proposed 2025 Schedule Q Rates ($/Month)
1 8
18 No. Additional Service Category Reference
Agency-Approved Maximum
Rate Description
5 Return Trip (SFD, MFD, Mixed
Use, or Commercial)
Sections

5.02.A, B, C;

5.03.A, B, C;

5.04.A, B, C
$20.92 for SFD
$20.92 for Commercial, Mixed
Use, and MFD
Per Collection event (i.e. request to
return and provide Collection service
after the Customer failed to properly
set out their Container(s) for
regularly scheduled Collection)
6 Additional Targeted
Recyclable Materials or
Organic Materials Cart Service
for SFD
Sections

5.03.A and

5.04.A
$1.37 per Recycling Cart
$4.16 per Organic Materials Cart
Per Cart month (any Cart size). Six
month minimum charge required.

Includes one-time Cart delivery upon
start of service and removal of Cart
when service is discontinued by
Customer.
7 Additional On-Call Bulky Item
Collection
Sections

5.05,

5.06 $113.74 Per Bulky Item Collection event (in
addition to the events provided at no
charge to Customer pursuant to
Section 5.12)
8 Collect Contaminated
Targeted Recyclable Materials
or Organic Materials
Container
Section 6.03.A and

8.02.F
25% of base monthly Solid Waste
Rate for the size of Container
Collected once per week plus
Return Trip Fee if applicable
Per Collection event for Container
with Contamination Level greater
than the maximum level pursuant to
Table 1 in Section 6.02.B
9 Lock Service (Key Service) Section 8.02.B A - $11.85 per usage B - $13.24 per usage
Monthly cost:

A-Residential Customers
B-Commercial Customers
10 Lock Purchase Section 8.02.B $23.71 per lock Per lock 1 9
19 Proposed 2025 Schedule Q Rates ($/Month)
No. Additional Service Category Reference
Agency-Approved Maximum
Rate Description
11 Overage Service Section 8.02.G 100% of the base monthly Solid Waste Collection Rate
Per Collection event (after the first
two events)
12 Overage Bags Cost Section 8.02.G 50% of the base monthly Solid Waste Collection Rate or $11.14
minimum
Per bag
13 Container Cleaning Service Section 8.05.D A - $69.73 B - $118.54
A - per Cart
B - per Bin or Drop-Box Charge only
applies to cleaning or Container
exchange in addition to the service to
be provided at no charge to the
Customer pursuant to Section 8.05.D.
14 Dirty Cart Replacement
(Exchange) Service
Section 8.05.D A - $90.65
B - $104.60
C - $118.54
A - per 32 gallon Cart
B - per 64 gallon Cart
C - per 96 gallon Cart
Charge only applies to cleaning or
Container exchange in addition to the
service to be provided at no charge to
the Customer pursuant to Section

8.05.D.
15 Additional Confidential
Document Destruction Service
Event
Section 5.07 $1,673.47 Per event
2 0
20 Proposed 2025 Schedule Q Rates ($/Month)
No. Additional Service Category Reference
Agency-Approved Maximum
Rate Description
16 Additional Compost Material
Delivery
Section 5.11 A - $174.31 per delivery
B - $348.65 per delivery
A - "one-way" only delivery by
Contractor where Contractor delivers
to and unloads compost at an Agencyapproved location
B- "Round-trip" delivery by
Contractor where Contractor delivers
compost in a Drop Box to an Agencyapproved location and returns at a later time or date to pick up the Drop
Box and any remaining compost
(charge includes the delivery of and
later pick-up of the Drop Box)
17 Community Drop-Off Events Section 5.13 $28,449.23 per event or day Per event or day targeting 5,000 households. Does not include
disposal or public education
expenses.
2 1
21 Proposed 2025 Schedule Q Rates ($/Month)
No. Additional Service Category Reference
Agency-Approved Maximum
Rate Description
18 Collection for AgencySponsored and Non-Agency
sponsored Community Events
Section 5.08 A - $4,183.70
B - $6,972.84
C - $10,459.27
A - One day event with a projected
2,500 or fewer attendees
B - One (1) or two (2) day events with
a projected 2,501 to 7,500 attendees
per day
C - One (1) or two (2) day events with
a projected 7,501 to 10,000 attendees
per day
Proposed 2025 Schedule Q Rates ($/Month)
2 2
22 Distance from Curb** One (1) Solid
Waste Cart
Two (2) Solid
Waste Carts
Three (3) Solid
Waste Carts
Four (4) Solid
Waste Carts
Distance <= 50 feet $25.08 $40.03 $80.12 $120.15
50 < Distance <= 100 feet 29.29 44.25 84.29 124.35
100 < Distance <= 150 feet 33.45 48.42 88.45 128.53
150 < Distance <= 200 feet 37.66 52.61 92.64 132.73
200 < Distance <= 250 feet 41.83 56.78 96.85 136.91
250 < Distance <= 300 feet 46.02 60.96 101.03 141.07
300 < Distance <= 350 feet 50.21 65.14 105.22 145.25
Each additional 50 foot
increment over 350 feet
** Distance shall be measured from the face of the curb, or from the edge of the roadway nearest the closest edge of the Cart, if there is no curb.

Backyard Collection Service Charge for Single Family Dwellings (Section 5.02.A)
Amount equal the difference between the Charge for 250 to 300 feet and 300 to 350 feet
* Backyard Collection Service Charges are charges added to the base monthly Rate for Single-Family Collection service, and cover the provision of Backyard Collection Service for all Customer's Solid Waste, Recyclable Materials, and Organic Materials Carts. © 2014 HDR Architecture, Inc., all rights reserved. © 2016 HDR, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.

Adoption of Revised Housing Element
City Council- September 10, 2024
Kathy Kleinbaum, Assistant City Manager
Housing Element Update Process
• Housing Element Update commenced in May 2021
• City Council adopted the Housing Element and certified the Final Environmental Impact Report (EIR) in January 2023, prior to the State’s statutory deadline
• Since then, revisions have been made in response to additional comment letters from HCD
• The City completed the zoning amendments needed for
compliance with State regulations in January 2024
• On July 26, 2024, HCD determined the most recent draft met statutory requirements of State Housing Element Law
• The City must repeal the prior adopted Housing Element and adopt the revised version in order to obtain HCD certification • Planning Commission unanimously recommended City Council adoption of revised Housing Element on August 20th
2 Revisions to Housing Element
from prior adopted version
• Added new policies to meet requirements to Affirmatively Further Fair Housing (AFFH) by encouraging affordable
housing development throughout Belmont
• Standardized approach and assumptions for housing sites inventory analysis
• Reduced density assumptions for the sites
• Broke up larger site consolidations into multiple
smaller sites
• Removed some smaller parcels from sites inventory
 No new properties were added to the inventory
• Reformatted the document to be more consistent with other City plan documents
3 Overview of AFFH Policy Additions
• Policy updates reviewed by City Council in March 2024 • Primary focus is on ADU development – going beyond
existing State laws related to ADUs and SB9 units
• Newly added programs allow for more flexible unit sizes and configurations
• Provide targeted outreach to encourage more ADU
development
• Offer loans to encourage ADUs to be available for lowincome households • Provide technical assistance to support development of affordable housing on church and school properties allowed under SB4
4 City Council Action
Approve Resolution to Adopt a General Plan Amendment
to repeal the previously adopted 2023-2031 Housing
Element and adopt the revised 2023-2031 Housing Element of the 2035 General Plan, in Compliance with State Housing Element Law
Next Steps
• Staff will submit Adopted Housing Element to HCD for
certification
• HCD has up to 60 days for final review cycle
5 Questions?
6 Belmont Library Exterior Improvement
City Council Meeting
September 10, 2024
1/13/2025 Belmont Library Improvements 2
Background
• Library was built in 2006
• Exterior paint update is needed (industry standard: 5-10 years) • Interior improvements will be proposed soon
1/13/2025 Belmont Library Improvements 3
Existing Exterior Paint
1/13/2025 Belmont Library Improvements 4
New Exterior Paint
1/13/2025 Parks & Recreation Monthly Highlights 5
New Exterior Paint
“My Belmont” 311 App
Ann Ritzma, Admin Services Director
September 10, 2024
Text here
Title
Text here
Title
Quickly access City information from your phone:

City Website
City News
City Event Calendar
Parks and Recreation Information
Permit Center
Social Media Channels
Text here
Title
Report a non-emergency issue using the “My Belmont” app or the MYBELMONT portal on the City’s website
Concerns Parking Traffic Storm Water
Sewer Sidewalks Streets Parks and Open Space
MYBELMONT tracks your report and sends you updates (if you provide an email address) The status of all MYBELMONT issues are posted and available on the app or website.

Text here
Download
the app for
use with
your mobile
device.

Or use the
web portal
on any
browser.
www.belmont.gov/mybelmont
www.belmont.gov/311
Text here
Promoted on:
- City Social Accounts
- Weekly Updates
- Meetings
- City Website
Thank you!
www.belmont.gov/mybelmont
National Night Out 2024
Event Recap
September 10, 2024
September 10, 2024 National Night Out 2024- Recap to Belmont City Council 2 August 6, 2024
Sept. 26, 2023 National Night Out 2023 - Update to Belmont City Council
3 September 10, 2024 National Night Out 2024 - Recap to Belmont City Council 4 Neighborhood Event Address Time of Event
Carlmont 1110 Alameda de las Pulgas (Belmont Library) 6:00 - 8 p.m.

Sterling Downs 409 Yorkshire Way (Alexander Park) TBD
Homeview 350-398 Ralston Avenue (O'Donnell Park) 5-7:30 p.m.

McDougal 1405 Solana Drive (Charles Armstrong School) 5-7 p.m.

Downtown 1300 Fifth Avenue (Good Shepherd Church) 6-8 p.m.

Central Cul de sac at end of Mezes Avenue 6-8 p.m.

Central 900 block of Ruth Avenue 6-8 p.m.

Plateau Skymont 3266 Lori Drive (Calvary Chapel) 6:00-8 p.m.

Western Hills End of Carlmont Drive (Hidden Canyon Park) TBD September 10, 2024 National Night Out 2024 - Recap to Belmont City Council 5 September 10, 2024 National Night Out 2024 - Recap to Belmont City Council 6 On behalf of the Belmont Police
Department, we would like to
thank the Belmont City Council,
staff of the city, the site sponsors
and especially the community for a
great event. Looking forward to
next year!
Save the Date:

August 5, 2025
[email protected]

TWIN PINES PARK STORMWATER

DETENTION BASIN PROJECT
City Council
September 10, 2024

MEETING OVERVIEW
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 2 Project Background and Objectives
Project Description
CEQA Findings
Staff Recommendations
The Belmont Creek watershed encompasses
approximately 1,900 acres
Regional flooding occurs downstream of El Camino
Real
Belmont Creek can convey 10-year storm; however
more frequent events its capacity
The Belmont Creek Watershed Management Plan
identified the need for stormwater detention
basins
Project Background
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 3 Project Objectives
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 4 To provide downstream flood mitigation to protect the community, while maintaining habitat and natural surface water features as much as possible.

Designed a reasonable and cost-effective project that:
 Reduces downstream flooding and maximizes flood protection in the Lower Belmont Creek watershed;
 Reduces erosion and prevent failure of stream banks;
 Reduces downstream sedimentation and need for dredging;  Minimizes disruption and damage to public and private landowners; and  Improves water quality through pollutant capture and removal. Constructs an underground stormwater detention facility in Twin Pines Park / City Hall parking area
Designed to:
attenuate the peak stormwater flow of Belmont Creek
trap sediment and debris
reduce flood risk in the flood-prone lower creek reach downstream of El Camino Real
provide ancillary water quality benefits
Project Description
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 5 Project Description
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 6

COMPONENTS
High Flow
Low Flow
Project Description
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 7 Water levels
rise to diversion
weir elevation
Water spills into
detention basin
Water exits
through 12-inch
outlet pipe into
Belmont Creek
Water diverted
through the
sediment
chamber
Water exits the
chamber
downstream of
the check
structure

OPERATION
Regular inspection and periodic sediment removal from
the sediment chamber
The amount of sediment removed during routine
maintenance varies depending on storm events and
sediment moving through the creek each year
Likely annual removal
Estimated to be approximately 200 cubic yards on average Removed sediment would be hauled to a site within San
Mateo County for beneficial reuse or to Ox Mountain
Landfill
Project Description
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 8

MAINTENANCE
CEQA
9 The California Environmental Quality Act enacted in 1970 The City drafted an Initial Study and Environmental Impact Report (EIR) for the “whole of the project” and project alternatives CEQA requires the lead agency consider significant environmental impacts prior to project approval
CEQA requires the lead agency to adopt a Statement of Overriding Considerations and the Mitigation Monitoring and Reporting Program
CEQA
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 10 EIR identifies four areas that can be reduced to less than significant with mitigation measures:
• Air Quality and Greenhouse Gas (GHG) Emissions. Mitigation addresses construction emissions.
• Biological Resources. Mitigation reduces construction impacts to sensitive species (special-status plants, bats, nesting birds); requires worker awareness environmental training;
compensation for loss of habitat and a wetland mitigation and monitoring plan.

CEQA ANALYSIS
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 11

EIR FINDINGS
EIR findings continued:
• Cultural Resources. Mitigation requires development of an Archaeological Resources Data Recovery and Treatment Plan (ARDRTP), a cultural resources monitoring plan, a cultural resources awareness and sensitivity training program, and informational signage.
• Hydrology and Water Quality. Mitigation addresses in-water construction plan; and development of a geomorphic
monitoring and adaptive management plan.

CEQA ANALYSIS
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 12

EIR FINDINGS
EIR identifies one area that cannot be reduced to less than significant with mitigation measures and the impact would remain significant and unavoidable:
• Tribal Cultural Resources. Mitigation requires development of an ARDRTP in consultation with the Muwekma Ohlone Tribe of the San Francisco Bay Area.

CEQA ANALYSIS
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 13

EIR FINDINGS
Initial Study (Appendix B) identifies two areas that can be reduced to less than significant with mitigation measures:
• Geology and Soils. Mitigation addresses the potential to discover paleontological resources.
• Noise. Mitigation addresses temporary construction noise and ground-borne vibrations.

CEQA ANALYSIS
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 14

EIR FINDINGS
EIR analyzed 5 alternatives:

1. Alternative 1 – No Project

2. Alternative 2 – Hidden Canyon Park

3. Alternative 3 – Notre Dame Belmont High School Softball Field

4. Alternative 4 – Notre Dame de Namur Soccer Field

5. Alternative 5 – Carlmont High School Softball Field
The Project was determined to be the environmentally superior alternative.

CEQA ANALYSIS
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 15

ALTERNATIVES

CEQA ANALYSIS
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 16

ALTERNATIVES

FINAL EIR
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 17 Responses to Comments
• Draft EIR published on May 14, 2024 (45-day public
review period)
• Planning Commission hearing on June 4, 2024
• Commissioners commented on Draft EIR
• No public comments received
• Comment period closed June 28, 2024
• Two comment letters received
• CDFW
• County of San Mateo

FINAL EIR
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 18 Responses to Comments
• Comments pertained to biological resources,
project design and alternatives
• None of the comments required recirculation of the
Draft EIR
• After Project approval, City to file Notice of
Determination
• 30-day statute of limitations on CEQA challenges
(approx. Nov 11)

STAFF RECOMMENDATIONS
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 19 • Certify the EIR
• Adopt the Statement of Overriding Considerations
• Adopt the MMRP
• Approve the Project under CEQA Guidelines Section
15092

SCHEDULE
9/10/2024 Twin Pines Park Stormwater Detention Basin Project 20 City published Draft EIR May 14 through June 28, 2024
City published Final EIR/Response
to Comments August 30, 2024
City Council certifies EIR and
approves project for CEQA September 10, 2024
Design completion End of 2024
Construction begins TBD (2025 or 2026 stream
construction season)
Questions?
21 Website:
www.belmont.gov/StormwaterBasin
Public Works Department
(650) 595-7425
[email protected]