Cities Index.
Agenda packet

Berkeley City Council
May 16, 2023

Document
Agenda packet
Meeting
May 16, 2023
Body
Berkeley City Council
Pages
406
Original file
36.4 MB
Text extracted from the city's file for reading and search. The city's original file is the official record.
Page 179 ends

| 34
12'-0"
10'-0"

LATERAL
FILES

LATERAL
FILES
17'-0"
F
TV

LATERAL
FILES
F
F
F
14'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 2

ENGINE II, TRUCK II, MEDIC II, BATTALION CHIEF, EMS CHIEF 04/24/2023

14. WATCH OFFICE (238 S.F.)
SCALE: 1/8"=1'-0"

15. CAPTAIN'S OFFICE (120 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER OFFICES

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 80 of 306 ends
Page 180 ends

| 35
18'-0"
F
F
F
16'-0"

LATERAL
FILES
FAX

PRINTER/COPY

LATERAL
FILES

LATERAL
FILES

CITY OF BERKELEY
FIRE HOUSE NO. 2

ENGINE II, TRUCK II, MEDIC II, BATTALION CHIEF, EMS CHIEF 04/24/2023

16. BATTALION CHIEFS OFFICE (288 S.F.)

17. EMS CHIEF OFFICE (288 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER OFFICES

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 81 of 306 ends
Page 181 ends

| 36
18'-0"
21'-0"
8'-0"
MW
COFFEE
REF.A REF.B
R
+42"+34"
DINING
HOUSE
PANTRY
PANTRY
C
PANTRY
B REF.C HOUSE
REF.

PANTRY
A
DW
DW T
12'-0"

KITCHEN
PATIO
21'-0"

DAYROOM

SEATING
FOR 14
TV

CITY OF BERKELEY
FIRE HOUSE NO. 2

ENGINE II, TRUCK II, MEDIC II, BATTALION CHIEF, EMS CHIEF 04/24/2023

FIRE HOUSE - FIREFIGHTER QUARTERS

18. KITCHEN (378 S.F.)
SCALE: 1/8"=1'-0"

19. DINING AREA (252 S.F.)
SCALE: 1/8"=1'-0"

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 82 of 306 ends
Page 182 ends

| 37
24'-0"

DINING TV
14 RECLINERS

ENTERTAINMENT
CENTER

BOOKSHELVES

WORKSTATION
30'-0"
W D
14'-0"
FULL HT.

STORAGE

LAUNDRY
SINK
10'-0"

MOP SINK

MOP RACK

CITY OF BERKELEY
FIRE HOUSE NO. 2

ENGINE II, TRUCK II, MEDIC II, BATTALION CHIEF, EMS CHIEF 04/24/2023

20. DAY ROOM (720 S.F.)
SCALE: 1/8"=1'-0"

21. LAUNDRY ROOM (140 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 83 of 306 ends
Page 183 ends

| 38
(3) 24"X30"
LOCKERS, TYP.

TV
A B C
9'-0"
8'-6"
TV
A B C

XL TWIN BED

DESK/NIGHT STAND

HALLWAY
9'-0"
9'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 2

ENGINE II, TRUCK II, MEDIC II, BATTALION CHIEF, EMS CHIEF 04/24/2023

22. FIREFIGHTER BEDROOM - 9 (689 S.F.)
SCALE: 1/8"=1'-0"

23. FIREFIGHTER BATHROOM - ADA (81 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 84 of 306 ends
Page 184 ends

| 39
10'-0"
11'-0"
TV
A
B C
(4) 30"X30"
LOCKERS, TYP.
5'-0"
9'-0"
10'-0"
8'-0"
8'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 2

ENGINE II, TRUCK II, MEDIC II, BATTALION CHIEF, EMS CHIEF 04/24/2023

25. CAPTAIN BEDROOM, BATHROOM AND WORK AREA, ACCESSIBLE - 2 (500 S.F.) SCALE: 1/8"=1'-0"

24. FIREFIGHTER BATHROOM - 4 (256 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 85 of 306 ends
Page 185 ends

| 40
10'-0"
11'-0"
TV
A
B C
(4) 30"X30"
LOCKERS, TYP.
5'-0"
9'-0"
10'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 2

ENGINE II, TRUCK II, MEDIC II, BATTALION CHIEF, EMS CHIEF 04/24/2023

26. BC BEDROOM, BATHROOM AND WORK AREA, ACCESSIBLE (250 S.F.)

27. EMS CHIEF BEDROOM, BATHROOM AND WORK AREA, ACCESSIBLE (250 S.F.) SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 86 of 306 ends
Page 186 ends

| 41
9'-0"
12'-0"

FIRE SPRINKLER
RISER

WATER HEATER
HVAC EQUIP.
12'-0"
9'-0"
MAIN SERV.

PANEL

SUB-PANELS

FIRE ALARM
PANEL
14'-0"
10'-0"
RADIO EQUIP.

SECURITY SYS.

TEL. SERVICE

RACKS & DATA

SERVER HUB

CITY OF BERKELEY
FIRE HOUSE NO. 2

ENGINE II, TRUCK II, MEDIC II, BATTALION CHIEF, EMS CHIEF 04/24/2023

FIRE HOUSE - UTILITY SUPPORT/VERTICAL CIRCULATION

28. MECHANICAL ROOM (108 S.F.)
SCALE: 1/8"=1'-0"

29. ELECTRICAL ROOM (108 S.F.)
SCALE: 1/8"=1'-0"

30. COMMUNICATIONS ROOM (140 S.F.)
SCALE: 1/8"=1'-0"

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 87 of 306 ends
Page 187 ends

| 42

BERKELEY FIRE DEPARTMENT MASTER PLAN
(N) 3RD FLOOR
+ ROOF DECK
(N) 2ND
FLOOR
(E) APPARATUS BAY
(N)

ELEVATOR
(E) DINING
(E) KITCHEN
(N) LAUNDRY
(E) DAYROOM
(E) STORAGE
(E) CAPTAIN (E) ASST.

CHIEF
(E) STAIR
(E)
TOILET
(E)
H.C.

TOILET
(E) STAIR
(E) STAIR
(N) TURNOUT GEAR ROOM
(N) LOBBY
(N) OFFICE
(N) AUTOMATIC
BI-FOLDING DOORS (5)
DEMO (E) BLDG.

FOR NEW

PARKING AREA
(N) APPARATUS BAY
TRUCK 2 - 72'

RESERVE TRUCK
ENGINE 2
MEDIC 2

HAZ MAT UNIT

BC COMMAND VEHICLE

TYPE VI,
CROSS
STAFF

RESERVE AMBULANCE

OR EMS CHIEF

UTILITY PICK-UP
(F-250)

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
P:\2823.01 Berkeley Fire Service Master Plan-S&S\06 Design\3.1 Pre-Design\3.1.2 REVIT + CAD\Site-Floor Diagrams\Station No. 2\STATION 2 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 2 - (OPTION 1 - BLDG. RENOVATION & ADDITIONAL AREA) 2029 BERKELEY WAY, BERKELEY, CA 94704

SITE/FIRST FLOOR DIAGRAM
SCALE: 1/64" = 1'-0"

FIRST FLOOR DIAGRAM
SCALE: 1/16" = 1'-0"
FIRE STATION NO. 2 LEGEND:
(E) LOT AREA:
(E) BUILDING TOTAL AREA:

PROPOSED ADDED BLDG. AREA:
26,000 S.F.
13,955 S.F.
7,174 S.F.

EXISTING BUILDING AREA

ADDED BUILDING AREA

RENOVATION AREA
(E) FIRE
STATION 2

BERKELEY WAY
HEARST AVE.

SHATTUCK AVE.

HENRY ST.

03.17.2023

Page 88 of 306 ends
Page 188 ends

| 43

BERKELEY FIRE DEPARTMENT MASTER PLAN
(N)

ELEVATOR
(N) STAIR
(N) DECK
& MECH. AREA
(N) FITNESS
(N) STAIR
(E) MEZZANINE
(E) STAIR
(E) STAIR
(N)

ELEVATOR
(E) STAIR
(N) STAIR
(N) STAIR
(N) FF
RR 2
(N) FF
RR 4
(N) FF
RR 3
(N) FF
RR 1
(N) H.C.

FF RR 1
(N) H.C.

FF RR 2 (N) STORAGE
DEMO (E) BLDG.

OPEN TO
(E) APPARATUS BAY
FF RM. 1
FF RM. 2
FF RM. 9
FF RM. 8
FF RM. 7
FF RM. 4
FF RM. 5
FF RM. 6
FF RM. 3

EMS CHIEF BEDROOM,

WORK AREA

W/ ADA BATHROOM

CAPTAIN'S BEDROOM,

WORK AREA

W/ ADA BATHROOM

BC BEDROOM,

WORK AREA

W/ ADA BATHROOM

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
P:\2823.01 Berkeley Fire Service Master Plan-S&S\06 Design\3.1 Pre-Design\3.1.2 REVIT + CAD\Site-Floor Diagrams\Station No. 2\STATION 2 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
2029 BERKELEY WAY, BERKELEY, CA 94704

SECOND FLOOR DIAGRAM
SCALE: 1/16" = 1'-0"
LEGEND:

THIRD FLOOR DIAGRAM
SCALE: 1/16" = 1'-0"
FIRE STATION NO. 2 - (OPTION 1 - BLDG. RENOVATION & ADDITIONAL AREA)

EXISTING BUILDING AREA

ADDED BUILDING AREA

RENOVATION AREA

03.17.2023

Page 89 of 306 ends
Page 189 ends

| 44

BERKELEY FIRE DEPARTMENT MASTER PLAN

APPARATUS
BAY
+ SUPPORT

APPARATUS BAY
(3 BAYS DRIVE THROUGH)
STAIR
RAMP
UP

OFFICES
APP. BAY

SUPPORT
+

UTILITY
APP. BAY

SUPPORT
+

UTILITY
TRUCK 2 - 72' RESERVE TRUCK
ENGINE 2
MEDIC 2

HAZ MAT UNIT

BC COMMAND VEHICLE

TYPE VI,
CROSS
STAFF

RESERVE AMBULANCE
OR EMS CHIEF?

UTILITY PICK-UP
(F-250)

GENERATOR &

FUELING AREA
LIVING

QUARTERS

PARKING
DECK
(18 SPACES)
RAMP
DN
RAMP
UP
STAIR

OFFICES

FITNESS
+VERT.

CIRCULATION

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
P:\2823.01 Berkeley Fire Service Master Plan-S&S\06 Design\3.1 Pre-Design\3.1.2 REVIT + CAD\Site-Floor Diagrams\Station No. 2\STATION 2 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 2 - (OPTION 2 - NEW BLDG. & PARKING DECK) 2029 BERKELEY WAY, BERKELEY, CA 94704

SITE/FIRST FLOOR DIAGRAM
SCALE: 1/64" = 1'-0"

BERKELEY WAY
HEARST AVE.

SHATTUCK AVE.

HENRY ST.
1ST FLOOR BUILDING AREA:
2ND FLOOR BUILDING AREA:
3RD FLOOR BUILDING AREA:

TOTAL BUILDING AREA:

FIRE STATION NO. 2
12,070 S.F.
7,374 S.F.
1,535 S.F.
20,979 S.F.
2 STORY BUILDING

SECOND FLOOR DIAGRAM
SCALE: 1/32" = 1'-0"

THIRD FLOOR DIAGRAM
SCALE: 1/32" = 1'-0"

03.17.2023

Page 90 of 306 ends
Page 190 ends

| 45

BERKELEY FIRE DEPARTMENT MASTER PLAN

APPARATUS
BAY
+ SUPPORT

APPARATUS BAY
(3 BAYS DRIVE THROUGH)
STAIR
RAMP
UP

OFFICES
APP. BAY

SUPPORT
+

UTILITY
APP. BAY

SUPPORT
+

UTILITY
TRUCK 2 - 72' RESERVE TRUCK
ENGINE 2
MEDIC 2

HAZ MAT UNIT

BC COMMAND VEHICLE

TYPE VI,
CROSS
STAFF

RESERVE AMBULANCE
OR EMS CHIEF?

UTILITY PICK-UP
(F-250)

GENERATOR &

FUELING AREA
LIVING

QUARTERS

PARKING
DECK
(5 SPACES)
RAMP
DN
RAMP
UP
RAMP
UP
RAMP
DN
STAIR

OFFICES
RAMP
DN
ROOF

PARKING
DECK
(12 SPACES)
RAMP
UP
RAMP
DN
RAMP
UP
STAIR

FITNESS
+VERT.

CIRCULARTION

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
P:\2823.01 Berkeley Fire Service Master Plan-S&S\06 Design\3.1 Pre-Design\3.1.2 REVIT + CAD\Site-Floor Diagrams\Station No. 2\STATION 2 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 2 - (OPTION 3 - NEW BLDG. & PARKING/ROOF DECK) 2029 BERKELEY WAY, BERKELEY, CA 94704

SITE/FIRST FLOOR DIAGRAM
SCALE: 1/64" = 1'-0"
1ST FLOOR BUILDING AREA:
2ND FLOOR BUILDING AREA:
3RD FLOOR BUILDING AREA:

TOTAL BUILDING AREA:

FIRE STATION NO. 2
2 STORY BUILDING

SECOND FLOOR DIAGRAM
SCALE: 1/32" = 1'-0"

THIRD FLOOR/ROOF DECK DIAGRAM
SCALE: 1/32" = 1'-0"

BERKELEY WAY
HEARST AVE.

SHATTUCK AVE.

HENRY ST.
12,070 S.F.
7,336 S.F.
1,573 S.F.
20,979 S.F.

03.17.2023

Page 91 of 306 ends
Page 191 ends

FIRE STATION 3

Page 92 of 306 ends
Page 192 ends

DRAFT
MAY 08, 2023

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 46

PROJECT DESCRIPTION
The existing Fire House No. 3 is a two-story, 5,582 SF station and was originally designed in 1961 to provide operational space and living quarters for three personnel. The facility was seismically retrofitted in the 1990’s.

The fir
e station currently houses 6 personnel per shift and the units include Engine 3(3), Medic 3 (2) and Medic Trainee (1). The staffing is anticipated to increase to 7 personnel per shift.

Because this station is not anticipated to add a new unit, only a new staff member, it is a strong candidate for renovation and addition. The recommended solution includes:

1. Renovation of the entire station and expand the first level to provide a private station office and d e d i c a t e d t u r n o u t s t o r a g e a n d e x p a n d t h e s e c o n d l e v e l t o a d d d e d i c a t e d fi t n e s s r o o m . T h e e x p a n d e d area is 611 SF for a total expanded and renovated area of 6,193 SF.

The ROM Project Budget for the Recommended Option is $12-16M; not including escalation beyond 2024.

CITY OF BERKELEY
FIRE HOUSE NO. 3
2710 RUSSELL STREET, BERKELEY , CA 94705
C
C
F
RUSSELL ST.

COLLEGE AVE.

CHERRY ST.

Page 93 of 306 ends
Page 193 ends

| 47
Current Future
34 22
11 00
67 No. Type  of Space Space Attributes
Program Size
Firefighter Parking 14 firefighter parking spaces, secure and separate from public parking
3,200 10'x20'  ea.

Visitor Parking One regular and one ADA adjacent to entrance, shared with other public parking areas.
600 10'  x 20
Apparatus Washing
Area
Adjacent to hydrant for refill and testing; locate at
rear of App. Bays; provide clarifier for run‐off
0 rear  apron
Hose Maintenance
Area
Use rear apron area for cleaning hose; roll wet and
store on apparatus
0 rear  apron
Yard Hydrant Located at rear yard 0 rear  apron
Generator Area Located at rear yard 150 10'x15'
Fueling Area Above Grade Convault System ‐ 500 GA located at  240 12'  x 20' Trash Enclosure Exterior access for service; space for dumpster and recycling bins, Covered
150 10'x15'
Flagpole Flagpole area with lighting 25 5'x5'
Outdoor Patio  Outdoor uses; adjacent to Kitchen 200 10'x20' Fire House No. 3
Engine 3, Ambulance (Medic 3)
2710 Russel Street
SITE OPERATIONS
Square Footage
CONCEPTUAL SPACE NEEDS OUTLINE
Fire  House Company Make‐up ‐ Staffing Per shift
Engine 3 ‐ Captain, Engineer, Firefighter/Paramedic
Reserve Ambulance
TOTAL CURRENT AND FUTURE STAFFING:

Ambulance (Medic 3)
Medic Intern
Fire House No. 3
Berkeley Fire Department
Final Space Needs 3/20/2023 Page 1 of 4

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 94 of 306 ends
Page 194 ends

No. Type  of Space Space Attributes
FIRE HOUSE ‐ APP BAY/APP BAY SUPPORT Replacement
Program Size
1 Apparatus Bay (One
Engine and two
ambulance) Two
Double Bays
Engine, Ambulance and Reserve Ambulance.

Systems include tailpipe exhaust,  power and air
cord drops to each vehicle; electric heating system;
night lighting; bi‐folding auto‐close doors; trench
drains
2,720 (2)  20' x 68' 1,611
2 Medical  Supply Closet Heavy Duty Shelving; medical  supplies off of apparatus bay.
24 3'  x 8' 15
3 Clean Up  Clean‐up sink, shelving, Alcove in bay. 18 3' x 6' included  in T.O.
4 Equipment  Storage Yard equipment, bike storage (LEED  Requirement), compressor
64 8'  x 8' NIC
5 Turnout  Gear Room Two  lockers for each assigned personnel  (7 Personnel per day x 3 = 21 x 2= 42 lockers); Three
unassigned for 45 total lockers. Power at each
locker, continuous exhaust fan, floor drain, heavy
duty shelving; wildland gear bags.  Dirty area in
room with Extractor and Dryer, decon shower and
hanging area.  Part of response return path.
930 14'  x 24'
27' x 22'
384
6 Janitor Room Service sink, mop  rack; janitorial supplies; 48 6' x 8' 25 7 Work  Shop Alcove Work  bench/shop area for vise, peg board, tool storage with large flat work surface, Misc.
equipment storage , tool chest, Full height storage
cabinet, shop sink and eyewash.
120 4'  x 30' 50
8 Firefighter Restroom Fire fighter  toilet  and sink, off of apparatus bay 64 8'  x  8' NIC 9 Fitness  Room  Dedicated Fitness Room 624 24' x 26' 384 Fire House ‐ App Bay/Support Subtotal 4,612 2,469
Square Footage Renovation
SF
Fire House No. 3
Berkeley Fire Department
Final Space Needs 3/20/2023 Page 2 of 4
| 48

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 95 of 306 ends
Page 195 ends

| 49
No. Type  of Space Space Attributes
FIRE HOUSE ‐ FIREFIGHTER OFFICES Replacement
Program Size
10 Fire House Public
Lobby
Lobby with seating; adjacent to the public restroom.

Service window separation between Watch Office
and lobby.  Alcove in Lobby for Blood Pressure and
other wellness checks.
180 12'  x 15' 117
11 Fire House Public
Restroom
One All Gender Restroom, accessible, off of Lobby 64 8'x8' 51 12 Watch Office  Workstations for 2‐persons; provide space for lateral file cabinets (one cabinet per company) copy
machine and office supply storage, book shelving;
conference function
238 14'x17' 170
13 Captains  Office  Workstation for 2‐persons; provide space for lateral file cabinets.
120 12'  x 10' Use  Watch
Office
Fire House ‐ Firefighter Offices Subtotal 602 338
No. Type  of Space Space Attributes
FIRE HOUSE ‐ FIREFIGHTER QUARTERS Replacement
Program Size
14 Kitchen 3‐refrigerators; 3‐shift pantries; 1‐house pantry and refrigerator; 1‐dishwasher; electric induction
range/oven with hood; large microwave; large, 12"
deep sink  with disposer; prep sink at island; trash
and recycling areas; coffer service area; open to
Dining Area
378 18'  x 21' 219
15 Dining  Area Seating for  8 persons; wall‐mounted TV; open to kitchen; open to Day Room
216 12'  x 18' 213
16 Day Room Seating for 8 with recliner chairs; entertainment center and book shelving; Open to Dining, one work
station along wall.
576 24'  x 24' 213
17 Laundry Room Service sink; countertop; janitorial  supplies; mop rack, Washer/Dryer
140 10'  x 14' 96
18 Firefighter  Bedroom 5‐separate  bedrooms each  containing desk, chair, wall‐mounted TV, 1 bed with lockers in the hall
adjacent the room.
383 8.5'  x 9'  (5) 437
19 Intern Bedroom 1 bedroom each containing  desk, chair, wall‐ mounted TV, 1 bed with lockers the hall adjacent
the room.
77 8.5' x 9'   86
20 Firefighter Bathroom
ADA
1 accessible restroom with shower, sink, toilet 81 9' x 9' 81 21 Firefighter Bathrooms 3 restrooms  with shower, sink, toilet 192 8' x 8'  (3) 59 22 Captain  Bedroom,
Bathroom and Work
Area, Accessible
1 bedroom containing desk, chair, wall‐mounted TV,
1 bed, with accessible in‐suite bathroom.
250 10'  x 16'
10' x 9'   (1)
227
Fire House ‐ Firefighter Quarters Subtotal 2,292 1,631
Square Footage
Square Footage Renovation
SF
Renovation
SF
Fire House No. 3
Berkeley Fire Department
Final Space Needs 3/20/2023 Page 3 of 4

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 96 of 306 ends
Page 196 ends

| 50
No. Type  of Space Space Attributes
UTILITY SUPPORT/VERTICAL CIRCULATION Replacement
Program Size
23 Mechanical  Room HVAC  equipment; hot water heater; fire sprinkler riser
108 9'  x 12' NIC
24 Electrical Room Main  service panel, fire alarm panel; sub panels 108 9' X 12' NIC 25 Communications
Room
Telephone service racks, alert response system hub,
data server hub, radio equipment; security system
140 10'  x 14' NIC
26 Stairs (2x) for each level.  Two stairways from the second floor for exiting
576 18'  x 8' 166
27 Fire House Elevator Elevator and  machine room 240 8' x 10' (3) NIC Utility Support/ Vertical Circulation Subtotal 1,172 166 Engine 3, Medic 3, Reserve Ambulance: Summary Replacement Program
Renovation
SF
Fire House ‐ App Bay/Bay Support Subtotal 4,612 2,469
Fire House ‐ Firefighter Offices Subtotal 602 338
Fire House ‐ Firefighter Quarters Subtotal 2,292 1,631
Utility Support/Vertical Circulation Subtotal 1,172 166 BUILDING SUBTOTAL (SF) 8,678 4,604
Circulation at 30% 2,603 1,589
Engine 3,Medic 3, Reserve Ambulance: GRAND TOTAL (SF) 11,281 6,193 Square Footage Renovation
SF
Fire House No. 3
Berkeley Fire Department
Final Space Needs 3/20/2023 Page 4 of 4

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 97 of 306 ends
Page 197 ends

| 51
20'-0"
40'-0"
20'-0"
68'-0"
ENGINE 3
MEDIC 3 RESERVE AMBULANCE

AUTOMATIC
FOLDING DOOR, TYP. TRENCH DRAIN, TYP.

CITY OF BERKELEY
FIRE HOUSE NO. 3
ENGINE 3, AMBULANCE (MEDIC 3)
04/24/2023

1. APPARATUS BAY - 2 DRIVE-THROUGH BAYS (2,720 S.F.)
SCALE: 1/16"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 98 of 306 ends
Page 198 ends

8'-0"
3'-0"

HEAVY DUTY

SHELVING

APPARATUS BAY
6'-0"
3'-0"
S.S. CLEAN-UP SINK

W/ DRAIN BOARD,

HANDS FREE

APPARATUS BAY
8'-0"
8'-0"

COMPRESSOR

YARD TOOLS
BIKE

STORAGE

CITY OF BERKELEY
FIRE HOUSE NO. 3
ENGINE 3, AMBULANCE (MEDIC 3)
04/24/2023

3. CLEAN-UP (18 S.F.)
SCALE: 1/8"=1'-0"

2. MEDICAL SUPPLY CLOSET (24 S.F.)
SCALE: 1/8"=1'-0"

4. EQUIPMENT STORAGE (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT
| 52

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 99 of 306 ends
Page 199 ends

| 53
(45) 24"X24"X72"

TURNOUT LOCKERS
1 (21) 30"X14"
3 HIGH WILD

LAND GEAR

BAGS STORAGE

APPARATUS
BAY

MOP SINK
& SHELF
3 COMP.

SINK

SHELVING
ABOVE

TRENCH DRAIN
DRYING

CABINET

EXTRACTOR
HAZMAT
BINS (2)

SHELVING
ABOVE
20'-0"
24'-0"
27'-0"
20'-0" 14'-0"
34'-8"
SHOWER

APPARATUS
BAY

HANGING AREA

HEAVY DUTY SHELVING
ABOVE, TYP.
45 CITY OF BERKELEY
FIRE HOUSE NO. 3
ENGINE 3, AMBULANCE (MEDIC 3)
04/24/2023

5. TURNOUT GEAR ROOM (930 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 100 of 306 ends
Page 200 ends

6'-0"
8'-0"

SHELVING

MOP RACK

SERVICE
SINK
OPEN
BELOW
30'-0"
4'-0"
EQUIP.

STORAGE
TOOL
CHEST

EYEWASH
WORKBENCHFULL HT.

STORAGE
SHOP
SINK
8'-0"
8'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 3
ENGINE 3, AMBULANCE (MEDIC 3)
04/24/2023

6. JANITOR ROOM (48 S.F.)
SCALE: 1/8"=1'-0"

7. WORKSHOP ALCOVE (120 S.F.)
SCALE: 1/8"=1'-0"

8. FIREFIGHTER RESTROOM (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT
| 54

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 101 of 306 ends
Page 201 ends

| 55
24'-0"
26'-0"

TO EXTERIOR

KETTLE BAR/

STRETCHING

DUMBBELL
RACKS
HI-LOW

DRINKING

FOUNTAIN

EQUIPMENT

STORAGE RACK

EXERCISE
BIKES
BACK

EXTENSION

ELLIPTICAL

MACHINE

TREADMILL

CITY OF BERKELEY
FIRE HOUSE NO. 3
ENGINE 3, AMBULANCE (MEDIC 3)
04/24/2023

9. FITNESS ROOM (624 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 102 of 306 ends
Page 202 ends

15'-0"
12'-0"

ENTRANCE

TO MEETING ROOM &

GENDER NEUTRAL

ACCESSIBLE RESTROOM

BLOOD PRESSURE
& WELLNESS CHECKS

TO WATCH
OFFICE
8'-0"

TO PUBLIC
LOBBY
8'-0"
BABY

CHANGING

STATION

CITY OF BERKELEY
FIRE HOUSE NO. 3
ENGINE 3, AMBULANCE (MEDIC 3)
04/24/2023

10. FIRE HOUSE PUBLIC LOBBY (180 S.F.)
SCALE: 1/8"=1'-0"

11. FIRE HOUSE PUBLIC RESTROOM (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER OFFICES
| 56

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 103 of 306 ends
Page 203 ends

| 57
12'-0"
10'-0"

LATERAL
FILES

LATERAL
FILES
17'-0"
F
14'-0"

LATERAL
FILES

LATERAL
FILES
F
TV
COPY/

PRINT/FAX
BOOK

SHELVING

CITY OF BERKELEY
FIRE HOUSE NO. 3
ENGINE 3, AMBULANCE (MEDIC 3)
04/24/2023

12. WATCH OFFICE (238 S.F.)
SCALE: 1/8"=1'-0"

13. CAPTAIN'S OFFICE (120 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER OFFICES

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 104 of 306 ends
Page 204 ends

18'-0"
21'-0"
8'-0"
MW
COFFEE
REF.A REF.B
R
+42"+34"
DINING
HOUSE
PANTRY
PANTRY
C
PANTRY
B REF.C HOUSE
REF.

PANTRY
A
DW T
12'-0"

KITCHEN
TV
PATIO
18'-0"

DAYROOM

SEATING
FOR 8

CITY OF BERKELEY
FIRE HOUSE NO. 3
ENGINE 3, AMBULANCE (MEDIC 3)
04/24/2023

FIRE HOUSE - FIREFIGHTER QUARTERS

14. KITCHEN (378 S.F.)
SCALE: 1/8"=1'-0"

15. DINING AREA (216 S.F.)
SCALE: 1/8"=1'-0"
| 58

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 105 of 306 ends
Page 205 ends

| 59
24'-0"
DINING
TV
8 RECLINERS

ENTERTAINMENT
CENTER

WORKSTATION
24'-0"
W D
14'-0"
FULL HT.

STORAGE

LAUNDRY
SINK
10'-0"

MOP SINK

MOP RACK

CITY OF BERKELEY
FIRE HOUSE NO. 3
ENGINE 3, AMBULANCE (MEDIC 3)
04/24/2023

16. DAYROOM (576 S.F.)
SCALE: 1/8"=1'-0"

17. LAUNDRY ROOM (140 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 106 of 306 ends
Page 206 ends

9'-0"
8'-6"
(3) 24"X30"
LOCKERS, TYP.

TV
A B C
TV

XL TWIN BED

DESK/NIGHT STAND

HALLWAY
A B C
9'-0"
9'-0"
9'-0"
8'-6"
TV

CITY OF BERKELEY
FIRE HOUSE NO. 3
ENGINE 3, AMBULANCE (MEDIC 3)
04/24/2023

18. FIREFIGHTER BEDROOM - 5 (383 S.F.)
SCALE: 1/8"=1'-0"

19. FIREFIGHTER BATHROOM - ADA (81 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

20. INTERN BEDROOM (77 S.F.)
SCALE: 1/8"=1'-0"
| 60

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 107 of 306 ends
Page 207 ends

| 61
10'-0"
11'-0"
TV
A
B C
(4) 30"X30"
LOCKERS, TYP.
5'-0"
9'-0"
10'-0"
8'-0"
8'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 3
ENGINE 3, AMBULANCE (MEDIC 3)
04/24/2023

22. CAPTAIN BEDROOM & ACCESSIBLE BATHROOM (250 S.F.)
SCALE: 1/8"=1'-0"

21. FIREFIGHTER BATHROOM - 3 (192 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 108 of 306 ends
Page 208 ends

| 62
9'-0"
12'-0"

FIRE SPRINKLER
RISER

WATER HEATER
HVAC EQUIP.
12'-0"
9'-0"
MAIN SERV.

PANEL

SUB-PANELS

FIRE ALARM
PANEL
14'-0"
10'-0"
RADIO EQUIP.

SECURITY SYS.

TEL. SERVICE

RACKS & DATA

SERVER HUB

CITY OF BERKELEY
FIRE HOUSE NO. 3
ENGINE 3, AMBULANCE (MEDIC 3)
04/24/2023

FIRE HOUSE - UTILITY SUPPORT/VERTICAL CIRCULATION

23. MECHANICAL ROOM (108 S.F.)
SCALE: 1/8"=1'-0"

24. ELECTRICAL ROOM (108 S.F.)
SCALE: 1/8"=1'-0"

25. COMMUNICATIONS ROOM (140 S.F.)
SCALE: 1/8"=1'-0"

BERKELEY FIRE DEPARTMENT MASTER PLAN

Page 109 of 306 ends
Page 209 ends

| 63

BERKELEY FIRE DEPARTMENT MASTER PLAN

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
C:\Users\Luz\AppData\Local\Temp\AcPublish_7780\STATION 3 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 3 - SITE DIAGRAM (BLDG. RENOVATION & ADDITIONAL AREA) 2710 RUSSELL STREET, BERKELEY, CA 94705

SITE PLAN DIAGRAM
SCALE: 1/32" = 1'-0"
RUSSELL ST.

COLLEGE AVE.

CHERRY ST.

EXISTING LOT AREA:

FIRE STATION NO. 3
LEGEND:
9,359 S.F.
(E) FIRE STATION
NO. 3
2 STORY BUILDING

EXISTING BUILDING AREA

ADDED BUILDING AREA

RENOVATION AREA

03.17.2023
(E) PARKING AREA
(E) FUEL
PUMP

Page 110 of 306 ends
Page 210 ends

| 64

BERKELEY FIRE DEPARTMENT MASTER PLAN
(E) APPARATUS
ROOM
(E) OFFICE(N) LOBBY
(E) ADA
TOILET
(E) DAYROOM
(E) STAIR
(E) JAN.
(E) KITCHEN (E) LAUNDRY DEMO
(E) TOWER
ENGINE 3
MEDIC 3RESERVE AMBULANCE
(E) FUEL

STATION
(N) TURNOUT GEAR & DECON
(E)
STAIR
(N) FITNESS
(E) FF
BDRM. 1 (N) CAPT. BEDROOM
& WORK AREA,

ACCESSIBLE
(N) FF
BDRM. 2
(N) FF
BDRM. 3
(N) FF
BDRM. 4
(N) FF
BDRM. 5
(N) INTERN
BDRM.
(N) CAPT.

ACCESSIBLE

BATHROOM
(N) FF

ACCESSIBLE

BATHROOM
(N) FF
BATHROOM 1

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
C:\Users\Luz\AppData\Local\Temp\AcPublish_7780\STATION 3 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 3 - FLOOR PLANS (BLDG. RENOVATION & ADDITIONAL AREA) 2710 RUSSELL STREET, BERKELEY, CA 94705

FIRST FLOOR PLAN
SCALE: 1/16" = 1'-0"

SECOND FLOOR PLAN
SCALE: 1/16" = 1'-0"
EXISTING BUILDING AREA:

PROPOSED ADDED BUILDING AREA:

TOTAL BUILDING AREA:

FIRE STATION NO. 3
LEGEND:
5,582 S.F.
611 S.F.
6,193 S.F.
2 STORY BUILDING

EXISTING BUILDING AREA

ADDED BUILDING AREA

RENOVATION AREA

03.17.2023

Page 111 of 306 ends
Page 211 ends

FIRE STATION 4

Page 112 of 306 ends
Page 212 ends

| 65
DRAFT
MAY 08, 2023

BERKELEY FIRE DEPARTMENT MASTER PLAN

PROJECT DESCRIPTION
The existing Fire House No. 4 is 5,341 SF and was originally designed to provide operational space and living quarters for two people in 1960. The facility was seismically retrofitted and expanded to the size noted above in 1998. The fir
e station currently houses 3 personnel per shift on Engine 4 (3). And, per the Standards of Coverage Study prepared by Citigate, the Firehouse 4 location is recommended to add a future ambulance and Medic Intern. The staffing will increase to 7 personnel per shift.

Two options were evaluated. They include:

1. Renovation and expansion of 1,600 SF for a total SF of 6,941. The expansion will add the turnout storage space and a fitness room. The site does not have enough space to expand the apparatus bay for the added ambulance nor to expand the living quarters for additional staffing. Parking and privacy goals can not be met through the expansion.

2. Replace station on the existing expanded site. This option requires the expansion of the site and adds subterranean parking. A replacement 12,802 SF station plus a 6,000SF basement for parking would allow the addition of the future ambulance in this ambulance. (Recommended) The ROM Project Budget for the Recommended Option 2 is $36-41M; not including escalation beyond 2024.

CITY OF BERKELEY
FIRE HOUSE NO. 4
1900 MARIN AVENUE, BERKELEY , CA 94707
MARIN AVE.

MARIN AVE.

THE ALAMEDA

Page 113 of 306 ends
Page 213 ends

| 66

BERKELEY FIRE DEPARTMENT MASTER PLAN
Current Future
34 02
11 00
47 No. Type of Space Space Attributes
Program Size
Firefighter Parking 14 firefighter parking spaces, secure and separate from public parking
1,600 10'x20'  ea.

Visitor Parking One regular and one ADA adjacent to entrance, shared with other public parking areas.
600 10'  x 20
Apparatus Washing Area Adjacent to hydrant for refill and testing; locate at rear of App. Bays; provide clarifier for run‐off
0 rear  apron
Hose Maintenance Area Use rear apron area for cleaning hose; roll wet and store on apparatus
0 rear  apron
Yard Hydrant Located at rear yard 0 rear  apron
Generator Area Located at rear yard 150 10'x15'
Fueling Area Above Grade Convault System ‐ 500 GA 240 12'  x 20' Trash Enclosure Exterior access for service; space for dumpster and recycling bins, Covered
150 10'x15'
Flagpole Flagpole area with lighting 25 5'x5'
Outdoor Patio or Deck Outdoor uses; adjacent to Kitchen 200 10'x20' Fire House No. 4
Engine 4, Future Medic 4
1900 Marin Avenue
CONCEPTUAL SPACE NEEDS OUTLINE
Fire  House Company Make‐up ‐ Staffing Per shift
Future Ambulance
Reserve Engine
TOTAL CURRENT AND FUTURE STAFFING:

Engine 4 ‐ Captain, Engineer, Firefighter/Paramedic
Medic Intern
SITE OPERATIONS
Square Footage
Fire House No. 4
Berkeley Fire Department
Final Space Needs 3/16/2023 Page 1 of 3

Page 114 of 306 ends
Page 214 ends

| 67

BERKELEY FIRE DEPARTMENT MASTER PLAN
No. Type of Space Space Attributes
FIRE HOUSE ‐ APP BAY/APP BAY SUPPORT Program Size
1 Apparatus Bay (One Engine,
Future Ambulance and one
engine reserve)
Engine, Reserve Engine and Future Ambulance. Systems
include tailpipe exhaust,  power and air cord drops to each vehicle; electric heating system; night lighting; bi‐folding auto‐ close doors; trench drains
3,944 (2)  20'x 68'
(1) 18' x 68'
2 Medical  Supply Closet Heavy  Duty Shelving; medical supplies off of apparatus bay. 24 3' x 8' 3 Clean Up  Clean‐up sink, shelving, Alcove in bay. 18 3' x 6' 4 Equipment  Storage Yard equipment, bike storage (LEED Requirement), compressor
64 8'  x 8'
5 Turnout  Gear Room Two  lockers for each assigned personnel  (7 Personnel per day x 3 = 21x 2= 42 lockers); four unassigned for 46 total lockers. Power at each locker, continuous exhaust fan, floor drain, heavy duty shelving; wildland gear bags.  Dirty area in room with Extractor and Dryer, decon shower and hanging area.  Part of response return path.
876 20'  x 27'
14' x 24'
6 Janitor Room Service sink, mop rack; janitorial supplies; 48 6' x 8' 7 Work  Shop Alcove Work bench/shop area for vise, peg board, tool storage with large flat work surface, Misc. equipment storage , tool chest, Full height storage cabinet, shop sink and eyewash.
120 4'  x 30'
8 Firefighter Restroom Fire fighter  toilet  and sink, off of apparatus bay 64 8'  x 8' 9 Fitness  Room  Dedicated Fitness Room 624 26'  x 24'
Fire House ‐ App Bay/Support Subtotal 5,782
No. Type of Space Space Attributes
FIRE HOUSE ‐ FIREFIGHTER OFFICES Program Size
10 Fire House Public  Lobby Lobby  with seating; adjacent to the public restroom.   Service window separation between Watch Office and lobby.  Alcove in Lobby for Blood Pressure and other wellness checks.
180 12'  x 15'
11 Fire House Public  Restroom One All  Gender Restroom, accessible, off of Lobby 64 8'x8' 12 Watch Office  Workstations for up to 4‐persons; provide space for lateral file cabinets (one cabinet per company) copy machine and office supply storage, book shelving; conference function 238 14'  x 17'
13 Captains  Office  Workstation for 1‐person; provide space for lateral file cabinets.
120 10'  x 12'
Fire House ‐ Firefighter Offices Subtotal 602
Square Footage
Square Footage
Fire House No. 4
Berkeley Fire Department
Final Space Needs 3/16/2023 Page 2 of 3

Page 115 of 306 ends
Page 215 ends

| 68

BERKELEY FIRE DEPARTMENT MASTER PLAN
No. Type of Space Space Attributes
FIRE HOUSE ‐ FIREFIGHTER QUARTERS Program Size
14 Kitchen 3‐refrigerators; 3‐shift pantries; 1‐house pantry and refrigerator; 1‐dishwasher; electric induction range/oven with hood; large microwave; large, 12" deep sink  with
disposer; prep sink at island; trash and recycling areas; coffer service area; open to Dining Area
378 18'  x 21'
15 Dining  Area Seating for 8 persons; wall‐mounted TV; open to kitchen; open to Day Room
216 12'  x 18'
16 Day Room Seating for 8 with recliner chairs; entertainment center and book shelving; Open to Dining, one work station along wall. 576 24'  x 24'
17 Laundry Room Service sink; countertop; janitorial supplies; mop rack, Washer/Dryer
140 10'  x 14'
18 Firefighter Bedroom 6‐ separate bedrooms each containing desk, chair, wall‐ mounted TV, 1 bed with lockers outside door.
459 8.5'  x 9' (6)
19 Firefighter Bathroom ADA 1 accessible restroom with  shower, sink, toilet 81 9' x 9' 20 Firefighter Bathrooms 3 restrooms  with shower, sink, toilet 192 8' x 8'  (3) 21 Captain  Bedroom, Bathroom
and Work Area, Accessible
1 bedroom containing desk, chair, wall‐mounted TV, 1 bed, with accessible in‐suite bathroom.
250 10' x 16'
10' x 9'
(1)
Fire House ‐ Firefighter Quarters Subtotal 2,292
No. Type of Space Space Attributes
UTILITY SUPPORT/VERTICAL CIRCULATION Program Size
22 Mechanical  Room HVAC equipment; hot water heater; fire sprinkler riser 108 9'  x 12' 23 Electrical Room Main service panel, fire alarm panel; sub panels 108 9' X 12' 24 Communications  Room Telephone  service racks, alert response system hub, data server hub, radio equipment; security system
140 10'  x 14'
25 Stairs (2x) for each level.  Two stairways from the second floor for exiting
576 18'  x 8'
26 Fire House Elevator Elevator and machine room 240 8' x 10' (3) Utility Support/ Vertical Circulation Subtotal 1,172
Engine 4, Future Medic 4: Summary Program
Fire House ‐ App Bay/Bay Support Subtotal 5,782
Fire House ‐ Firefighter Offices Subtotal 602
Fire House ‐ Firefighter Quarters Subtotal 2,292
Utility Support/Vertical Circulation Subtotal 1,172
BUILDING SUBTOTAL (SF) 9,848
Circulation at 30% 2,954
Engine 4, Future Medic 4: GRAND TOTAL (SF) 12,802
Square Footage
Square Footage
Fire House No. 4
Berkeley Fire Department
Final Space Needs 3/16/2023 Page 3 of 3

Page 116 of 306 ends
Page 216 ends

| 69

BERKELEY FIRE DEPARTMENT MASTER PLAN
20'-0"
58'-0"
18'-0"
68'-0"
ENGINE 4
FUTURE MEDIC 4

AUTOMATIC
FOLDING DOOR, TYP.

TRENCH DRAIN, TYP.
20'-0"

RESERVE ENGINE

CITY OF BERKELEY
FIRE HOUSE NO. 4
ENGINE 4, FUTURE MEDIC 4
04/24/2023

1. APPARATUS BAY - 3 DRIVE-THROUGH BAYS (3,944 S.F.)
SCALE: 1/16"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 117 of 306 ends
Page 217 ends

| 70

BERKELEY FIRE DEPARTMENT MASTER PLAN
8'-0"
3'-0"

HEAVY DUTY

SHELVING

APPARATUS BAY
6'-0"
3'-0"
S.S. CLEAN-UP SINK

W/ DRAIN BOARD,

HANDS FREE

APPARATUS BAY
8'-0"
8'-0"

COMPRESSOR

YARD TOOLS
BIKE

STORAGE

CITY OF BERKELEY
FIRE HOUSE NO. 4
ENGINE 4, FUTURE MEDIC 4
04/24/2023

3. CLEAN-UP (18 S.F.)
SCALE: 1/8"=1'-0"

2. MEDICAL SUPPLY CLOSET (24 S.F.)
SCALE: 1/8"=1'-0"

4. EQUIPMENT STORAGE (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 118 of 306 ends
Page 218 ends

| 71

BERKELEY FIRE DEPARTMENT MASTER PLAN
(46) 24"X24"X72"

TURNOUT LOCKERS
1 (21) 30"X14"
3 HIGH WILD

LAND GEAR

BAGS STORAGE

APPARATUS
BAY

MOP SINK
& SHELF
3 COMP.

SINK

SHELVING
ABOVE

TRENCH DRAIN
DRYING

CABINET

EXTRACTOR
HAZMAT
BINS (2)

SHELVING
ABOVE
20'-0"
24'-0"
27'-0"
20'-0" 14'-0"
34'-8"
SHOWER

APPARATUS
BAY
46 HANGING AREA

HEAVY DUTY SHELVING
ABOVE, TYP.

CITY OF BERKELEY
FIRE HOUSE NO. 4
ENGINE 4, FUTURE MEDIC 4
04/24/2023

5. TURNOUT GEAR ROOM (876 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 119 of 306 ends
Page 219 ends

| 72

BERKELEY FIRE DEPARTMENT MASTER PLAN
6'-0"
8'-0"

SHELVING

MOP RACK

SERVICE
SINK
OPEN
BELOW
30'-0"
4'-0"
EQUIP.

STORAGE
TOOL
CHEST

EYEWASH
WORKBENCHFULL HT.

STORAGE
SHOP
SINK
8'-0"
8'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 4
ENGINE 4, FUTURE MEDIC 4
04/24/2023

6. JANITOR ROOM (48 S.F.)
SCALE: 1/8"=1'-0"

7. WORKSHOP ALCOVE (120 S.F.)
SCALE: 1/8"=1'-0"

8. FIREFIGHTER RESTROOM (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 120 of 306 ends
Page 220 ends

| 73

BERKELEY FIRE DEPARTMENT MASTER PLAN
24'-0"
26'-0"

TO EXTERIOR
KETTLE
BALL/

STRETCHING
AREA

DUMBBELL
RACKS
HI-LOW

DRINKING

FOUNTAIN

EQUIPMENT

STORAGE RACK

EXERCISE
BIKES
BACK

EXTENSION

ELLIPTICAL

MACHINE

TREADMILL

CITY OF BERKELEY
FIRE HOUSE NO. 4
ENGINE 4, FUTURE MEDIC 4
04/24/2023

9. FITNESS ROOM (624 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 121 of 306 ends
Page 221 ends

| 74

BERKELEY FIRE DEPARTMENT MASTER PLAN
15'-0"
12'-0"

ENTRANCE

TO MEETING ROOM &

GENDER NEUTRAL

ACCESSIBLE RESTROOM

BLOOD PRESSURE
& WELLNESS CHECKS

TO WATCH
OFFICE
8'-0"

TO PUBLIC
LOBBY
8'-0"
BABY

CHANGING

STATION

CITY OF BERKELEY
FIRE HOUSE NO. 4
ENGINE 4, FUTURE MEDIC 4
04/24/2023

10. FIRE HOUSE PUBLIC LOBBY (180 S.F.)
SCALE: 1/8"=1'-0"

11. FIRE HOUSE PUBLIC RESTROOM (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER OFFICES

Page 122 of 306 ends
Page 222 ends

| 75

BERKELEY FIRE DEPARTMENT MASTER PLAN
12'-0"
10'-0"

LATERAL
FILES
17'-0"
F
TV

LATERAL
FILES
F
F
F
14'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 4
ENGINE 4, FUTURE MEDIC 4
04/24/2023

12. WATCH OFFICE (238 S.F.)
SCALE: 1/8"=1'-0"

13. CAPTAIN'S OFFICE (120 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER OFFICES

Page 123 of 306 ends
Page 223 ends

| 76

BERKELEY FIRE DEPARTMENT MASTER PLAN
18'-0"
21'-0"
8'-0"
MW
COFFEE
REF.A REF.B
R
+42"+34"
DINING
HOUSE
PANTRY
PANTRY
C
PANTRY
B REF.C HOUSE
REF.

PANTRY
A
DW T
12'-0"

KITCHEN
TV
PATIO
18'-0"

DAYROOM

SEATING
FOR 8

CITY OF BERKELEY
FIRE HOUSE NO. 4
ENGINE 4, FUTURE MEDIC 4
04/24/2023

FIRE HOUSE - FIREFIGHTER QUARTERS

14. KITCHEN (378 S.F.)
SCALE: 1/8"=1'-0"

15. DINING AREA (216 S.F.)
SCALE: 1/8"=1'-0"

Page 124 of 306 ends
Page 224 ends

| 77

BERKELEY FIRE DEPARTMENT MASTER PLAN
24'-0"
DINING
TV
8 RECLINERS

ENTERTAINMENT
CENTER

WORKSTATION
24'-0"
W D
14'-0"
FULL HT.

STORAGE

LAUNDRY
SINK
10'-0"

MOP SINK

MOP RACK

CITY OF BERKELEY
FIRE HOUSE NO. 4
ENGINE 4, FUTURE MEDIC 4
04/24/2023

16. DAYROOM (576 S.F.)
SCALE: 1/8"=1'-0"

17. LAUNDRY ROOM (140 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

Page 125 of 306 ends
Page 225 ends

| 78

BERKELEY FIRE DEPARTMENT MASTER PLAN
9'-0"
8'-6"
(3) 24"X30"
LOCKERS, TYP.

TV
A B C
TV

XL TWIN BED

DESK/NIGHT STAND

HALLWAY
A B C
9'-0"
9'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 4
ENGINE 4, FUTURE MEDIC 4
04/24/2023

18. FIREFIGHTER BEDROOM - 6 (459 S.F.)
SCALE: 1/8"=1'-0"

19. FIREFIGHTER BATHROOM - ADA (81 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

Page 126 of 306 ends
Page 226 ends

| 79

BERKELEY FIRE DEPARTMENT MASTER PLAN
10'-0"
11'-0"
TV
A
B C
(4) 30"X30"
LOCKERS, TYP.
5'-0"
9'-0"
10'-0"
8'-0"
8'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 4
ENGINE 4, FUTURE MEDIC 4
04/24/2023

21. CAPTAIN BEDROOM, BATHROOM AND WORK AREA, ACCESSIBLE (250 S.F.) SCALE: 1/8"=1'-0"

20. FIREFIGHTER BATHROOM - (3) 192 S.F.

SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

Page 127 of 306 ends
Page 227 ends

| 80

BERKELEY FIRE DEPARTMENT MASTER PLAN
9'-0"
12'-0"

FIRE SPRINKLER
RISER

WATER HEATER
HVAC EQUIP.
12'-0"
9'-0"
MAIN SERV.

PANEL

SUB-PANELS

FIRE ALARM
PANEL
14'-0"
10'-0"
RADIO EQUIP.

SECURITY SYS.

TEL. SERVICE

RACKS & DATA

SERVER HUB

CITY OF BERKELEY
FIRE HOUSE NO. 4
ENGINE 4, FUTURE MEDIC 4
04/24/2023

FIRE HOUSE - UTILITY SUPPORT/VERTICAL CIRCULATION

24. MECHANICAL ROOM (108 S.F.)
SCALE: 1/8"=1'-0"

25. ELECTRICAL ROOM (108 S.F.)
SCALE: 1/8"=1'-0"

26. COMMUNICATIONS ROOM (140 S.F.)
SCALE: 1/8"=1'-0"

Page 128 of 306 ends
Page 228 ends

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 81

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
C:\Users\Luz\AppData\Local\Temp\AcPublish_16256\STATION 4 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 4 - (OPTION 1 - BLDG. RENOVATION & ADDITIONAL AREA) 1900 MARIN AVENUE, BERKELEY, CA 94707

SITE PLAN DIAGRAM
SCALE: 1/64" = 1'-0"
MARIN AVE.

MARIN AVE.

THE ALAMEDA
MONTEREY AVE.

EXISTING LOT AREA:

EXISTING BUILDING AREA:

PROPOSED NEW BUILDING AREA:

FIRE STATION NO. 4

EXISTING BUILDING AREA

PROPOSED NEW BUILDING AREA
LEGEND:
12,623 S.F.
5,341 S.F.
1,600 S.F.
2 STORY BUILDING

Page 129 of 306 ends
Page 229 ends

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 82
34'-0"
24'-0"
ENGINE 4

FUTURE MEDIC
4 RESERVE

AMBULANCE

THE ALAMEDA
MONTEREY AVE.
(FOR RESIDENCE DRIVEWAY ONLY)
MARIN AVE.

PROPOSED PROPERTY LINE

RAMP DOWN

TO BASEMENT PARKING

PROPOSED

SIDEWALK

EXISTING

CURB LINE
OFFICES + UTILITY
+ VERT. CIRCULATION
+ APP. BAY SUPPORT

APPARATUS BAY

APPARATUS BAY
SUPPORT + UTILITY
+ VERT. CIRCULATION

FIREHOUSE

LOBBY ENTRANCE

EXISTING ROAD CURB LINE

PROPOSED

ROAD CURB

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
C:\Users\Luz\AppData\Local\Temp\AcPublish_16256\STATION 4 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 4 - (OPTION 2 - NEW BUILDING, EXPANDED SITE AND ADD BASEMENT PARKING) 1900 MARIN AVENUE, BERKELEY, CA 94707

SITE & FIRST FLOOR DIAGRAM
SCALE: 1/32" = 1'-0"
PROPOSED LOT AREA:

PROPOSED 1ST FLOOR:

PROPOSED 2ND FLOOR:

TOTAL BLDG. AREA:

FIRE STATION NO. 4
±20,296 S.F.
8,667 S.F
4,135 S.F.
12,802 S.F.

PROPOSED 2 STORY BUILDING

03.17.2023

Page 130 of 306 ends
Page 230 ends

FIRE STATION 5

Page 131 of 306 ends
Page 231 ends

| 83
DRAFT
MAY 08, 2023

BERKELEY FIRE DEPARTMENT MASTER PLAN

PROJECT DESCRIPTION
Fire House No. 5 was expanded to 9, 369 SF when it was seismically upgraded in 2012. In this expansion the living quarters were modified to provide space for 9 on-duty personnel per shift. The fire station currently houses 9 personnel per shift and Truck 5 (3), Engine 5 (3), Medic 5 (2), and Medic Intern (1). The staffing is planned t
o increase to 11 personnel per shift. The firehouse also houses a Type VI wildland unit, a reserve engine and a utility truck. Several of the units can not be housed in the apparatus bays.

Three options were evaluated. They include:

1. Renovation and expansion of the existing station on the second level to provide 16, 983 SF of space. Parking requirements are not met with this solution.

2. Replace station on existing site without additional parking. Parking requirements are not met.

3. Replace station on existing site with 2 story, 16,983 SF station plus basement parking. Parking requirements are met with this solution.

The recommended option for this location is Option 3. All program criteria are met.

The ROM Project Budget for the Recommended Option 3 is $53-58M not including escalation beyond 2024.

CITY OF BERKELEY
FIRE HOUSE NO. 5
2680 SHATTUCK AVENUE, BERKELEY , CA 94704

CURRENT NUM

CURRENT APP
· ENGIN
· TRUCK
· RESERV
· TYPE IV

FIRE STATIO
DERBY ST.

SHATTUCK AVE.

TUCK AVE.

CARLETON ST.

Page 132 of 306 ends
Page 232 ends

| 84

BERKELEY FIRE DEPARTMENT MASTER PLAN
Current Future
34 34
22 11
00 00
00 9 11
No. Type  of Space Space Attributes
Program Size
Firefighter Parking 22 firefighter parking spaces, secure and separate from public parking
4,400 10'x20'  ea.

Visitor Parking One regular and one ADA adjacent to entrance, shared with other public parking areas.
200 10'  x 20
Apparatus Washing Area Adjacent to hydrant for refill and testing; locate at rear of App. Bays; provide clarifier for run‐off
0 rear  apron
Hose Maintenance Area Use rear apron area for cleaning hose; roll wet and store on apparatus
0 rear  apron
Yard Hydrant Located at rear yard 0 rear  apron
Generator Area Located at rear yard 150 10'x15'
Fueling Area Above Grade Convault System ‐ 1,500 GA 240 12'  x 20' Trash Enclosure Exterior access for service; space for dumpster and recycling bins, Covered
150 10'x15'
Flagpole Flagpole area with lighting 25 5'x5'
Outdoor Patio or Deck Outdoor uses; adjacent to Kitchen 200 10'x20' Medic 5 ‐ Medic, EMT
Medic Intern
Fire House No. 5
Truck 5, Engine 5, Medic 5,
2680 Shattuck Avenue
SITE OPERATIONS
Square Footage
CONCEPTUAL SPACE NEEDS OUTLINE
Fire  House Company Make‐up ‐ Staffing Per shift
Truck 5 ‐ Captain , Engineer, Firefighter/Paramedic
Engine 5 ‐ Captain, Engineer, Firefighter/Paramedic
Type III 4X4 ‐ Cross Staffed
Utility Pick‐up (F‐250)
TOTAL CURRENT AND PLANNED STAFFING:

Engine ‐ Reserve
Fire House No. 5
Berkeley Fire Department
Final Space Needs 3/17/2023 Page 1 of 3

Page 133 of 306 ends
Page 233 ends

| 85

BERKELEY FIRE DEPARTMENT MASTER PLAN
No. Type  of Space Space Attributes
FIRE HOUSE ‐ APP BAY/APP BAY SUPPORT Program Size
1 Apparatus  Bay (One Truck
drive through bay, three
double bays)
Truck, Engine, Medic  ‐  Front line apparatus.   Type III 4x4, Reserve Engine, Air Unit, Utility Truck ‐  Second Line Storage.

Systems include tailpipe exhaust,  power and air cord drops to each vehicle; electric heating system; night lighting; bi‐ folding auto‐close doors; trench drains
6,080 (2)  20'x 80'
(2) 18' x 80'
2 Medical  Supply Closet Heavy  Duty Shelving; medical supplies off of apparatus bay. 24 3'  x 8' 3 Clean  Up  Clean‐up sink, shelving, Alcove in bay. 18 3'  x 6' 4 Equipment  Storage Yard equipment, bike storage (LEED Requirement), compressor
96 8'  x 12'
5 Turnout  Gear Room Two lockers for each assigned personnel  (11 Personnel per day x 3 = 33), 66 lockers); 4 unassigned for 70 total lockers.

Power at each locker, continuous exhaust fan, floor drain, heavy duty shelving; wildland gear bags.  Dirty area in room with Extractor and Dryer, decon shower and hanging area.

Part of response return path.
1,200 24'  x 50'
6 Janitor  Room Service sink, mop rack; janitorial supplies; 48 6'  x 8' 7 Work  Shop Alcove Work bench/shop area for vise, peg board, tool storage with large flat work surface, Misc. equipment storage , tool chest, Full height storage cabinet, shop sink and eyewash.
120 4'  x 30'
8 Firefighter  Restroom Fire  fighter  toilet and sink, off o f apparatus bay 64 8'  x 8' 9 Fitness  Room  Dedicated Fitness Room 624 26'  x 24'
Fire House ‐ App Bay/Support Subtotal 8,274
No. Type  of Space Space Attributes
FIRE HOUSE ‐ FIREFIGHTER OFFICES Program Size
10 Fire  House Public Lobby Lobby  with seating; adjacent to the public restroom.   Service window separation between Watch Office and lobby.  Alcove in Lobby for Blood Pressure and other wellness checks.
180 12'  x 15'
11 Fire  House Public Restroom One  All Gender Restroom, accessible, off of Lobby 64 8'x8' 12 Watch  Office  Workstations for 4‐persons; provide space for lateral file cabinets (one cabinet per company) copy machine and office supply storage, book shelving; conference function
238 14'  x 17'
13 Captains  Office (Truck Captain
and Engine Captain)
Workstation for 2‐persons; provide space for (6) lateral file cabinets.
120 12'  x 10'
Fire House ‐ Firefighter Offices Subtotal 602
Square Footage
Square Footage
Fire House No. 5
Berkeley Fire Department
Final Space Needs 3/17/2023 Page 2 of 3

Page 134 of 306 ends
Page 234 ends

| 86

BERKELEY FIRE DEPARTMENT MASTER PLAN
No. Type  of Space Space Attributes
FIRE HOUSE ‐ FIREFIGHTER QUARTERS Program Size
14 Kitchen 3‐refrigerators; 3‐shift pantries; 1‐house pantry and refrigerator; 2‐dishwasher; electric induction range/oven with hood; large microwave; large, 12" deep sink  with
disposer; prep sink at island; trash and recycling areas; coffer service area; open to Dining Area
378 18'  x 21'
15 Dining  Area Seating for 12 persons; wall‐mounted TV; open to kitchen; open to Day Room
252 12'  x 21'
16 Day  Room Seating for 12 with recliner chairs; entertainment center and book shelving; Open to Dining, one work station along wall. 720 24'  x 30'
17 Laundry  Room Service sink; countertop; janitorial supplies; mop rack, Washer/Dryer
140 10'  x 14'
18 Firefighter  Bedroom 9 ‐separate bedrooms each containing desk, chair, wall‐ mounted TV, 1 bed with lockers outside door.
689 8' ‐6" x 9' (9)
19 Firefighter  Bathroom ADA 1  accessible restroom with shower, sink, toilet 81 9'  x 9' 20 Firefighter  Bathrooms 4  restrooms with shower, sink, toilet 256 8'  x 8' (4) 21 Captain  Bedroom, Bathroom
and Work Area, Accessible
2‐separate bedrooms each containing desk, chair, wall‐
mounted TV, 1 bed. One with accessible in‐suite bathroom. 500 10' x 11' (2)
5' x10 (2)
10' x 9' (2)
Fire House ‐ Firefighter Quarters Subtotal 3,016
No. Type  of Space Space Attributes
UTILITY SUPPORT/VERTICAL CIRCULATION Program Size
22 Mechanical  Room HVAC equipment; hot water heater; fire sprinkler riser 108 9'  x 12' 23 Electrical  Room Main service panel, fire alarm p anel; sub panels 108 9'  X 12' 24 Communications  Room Telephone  service racks, alert response system hub, data server hub, radio equipment; security system
140 10'  x 14'
25 Stairs (2x) for each level.  Two stairways from the second floor for exiting
576 18'  x 8'
26 Fire  House Elevator Elevator and machine room 240 8'  x 10' (3) Utility Support/ Vertical Circulation Subtotal 1,172
Engine 5, Truck 5, Medic 5: Summary Program
Fire House ‐ App Bay/Bay Support Subtotal 8,274
Fire House ‐ Firefighter Offices Subtotal 602
Fire House ‐ Firefighter Quarters Subtotal 3,016
Utility Support/Vertical Circulation Subtotal 1,172
BUILDING SUBTOTAL (SF) 13,064
Circulation at 30% 3,919
Engine 5, Truck 5, Medic 5: GRAND TOTAL (SF) 16,983
Square Footage
Square Footage
Fire House No. 5
Berkeley Fire Department
Final Space Needs 3/17/2023 Page 3 of 3

Page 135 of 306 ends
Page 235 ends

| 87

BERKELEY FIRE DEPARTMENT MASTER PLAN

AUTOMATIC

FOLDING DOOR,
TYP.

TRENCH DRAIN,
TYP.
76'-0"
18'-0" 20'-0"20'-0"
80'-0"

UTILITY TRUCKBC VEHICLE - FUTURE

OR RESERVE ENGINE
MEDIC 5
FIRE TRUCK 5

TRENCH DRAIN,
TYP.

FIRE ENGINE 5

AIR UNIT
TYPE III 4X4
18'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 5
TRUCK 5, ENGINE 5, MEDIC 5
04/24/2023

1. APPARATUS BAY - 4 DRIVE-THROUGH BAYS (6,080 S.F.)
SCALE: 1/16"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 136 of 306 ends
Page 236 ends

| 88

BERKELEY FIRE DEPARTMENT MASTER PLAN
8'-0"
3'-0"

HEAVY DUTY

SHELVING

APPARATUS BAY
6'-0"
3'-0"
S.S. CLEAN-UP SINK

W/ DRAIN BOARD,

HANDS FREE

APPARATUS BAY
8'-0"
12'-0"

COMPRESSOR

YARD TOOLS
BIKE

STORAGE

CITY OF BERKELEY
FIRE HOUSE NO. 5
TRUCK 5, ENGINE 5, MEDIC 5
04/24/2023

3. CLEAN-UP (18 S.F.)
SCALE: 1/8"=1'-0"

2. MEDICAL SUPPLY CLOSET (24 S.F.)
SCALE: 1/8"=1'-0"

4. EQUIPMENT STORAGE (96 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 137 of 306 ends
Page 237 ends

| 89

BERKELEY FIRE DEPARTMENT MASTER PLAN
35'-0"
50'-0"
24'-0"

MOP SINK
& SHELF
DRYING

CABINET

EXTRACTOR
DECON
SHOWER

APPARATUS
BAY (72) 24"X24"X72" LOCKERS, TYP.
(POWER @ EA. LOCKER AND

CONTINUOUS EXHAUST FAN)

HEAVY DUTY SHELVING
ABOVE, TYP.
(36) 30"X14"
3 HIGH WILD LAND

GEAR BAGS STORAGE
HAZMAT
BINS (2)

SHELVING
ABOVE
1 7 8 14
15 24
25 54
33 32
55 64
65 70

APPARATUS
BAY

TRENCH DRAIN

UTILITY
SINK &
SHELF
DRYING
AREA

CITY OF BERKELEY
FIRE HOUSE NO. 5
TRUCK 5, ENGINE 5, MEDIC 5
04/24/2023

5. TURNOUT GEAR ROOM (1,200 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 138 of 306 ends
Page 238 ends

| 90

BERKELEY FIRE DEPARTMENT MASTER PLAN
6'-0"
8'-0"

SHELVING

MOP RACK

SERVICE
SINK
OPEN
BELOW
30'-0"
4'-0"
EQUIP.

STORAGE
TOOL
CHEST

EYEWASH
WORKBENCHFULL HT.

STORAGE
SHOP
SINK
8'-0"
8'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 5
TRUCK 5, ENGINE 5, MEDIC 5
04/24/2023

6. JANITOR ROOM (48 S.F.)
SCALE: 1/8"=1'-0"

7. WORKSHOP ALCOVE (120 S.F.)
SCALE: 1/8"=1'-0"

8. FIREFIGHTER RESTROOM (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 139 of 306 ends
Page 239 ends

| 91

BERKELEY FIRE DEPARTMENT MASTER PLAN
24'-0"
26'-0"

TO EXTERIOR
KETTLE
BALL/

STRETCHING

DUMBBELL
RACKS
HI-LOW

DRINKING

FOUNTAIN

EQUIPMENT

STORAGE RACK

EXERCISE
BIKES
BACK

EXTENSION

ELLIPTICAL

MACHINE

TREADMILL

CITY OF BERKELEY
FIRE HOUSE NO. 5
TRUCK 5, ENGINE 5, MEDIC 5
04/24/2023

9. FITNESS ROOM (624 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 140 of 306 ends
Page 240 ends

| 92

BERKELEY FIRE DEPARTMENT MASTER PLAN
15'-0"
12'-0"

ENTRANCE

TO MEETING ROOM &

GENDER NEUTRAL

ACCESSIBLE RESTROOM

BLOOD PRESSURE
& WELLNESS CHECKS

TO WATCH
OFFICE
8'-0"

TO PUBLIC
LOBBY
8'-0"
BABY

CHANGING

STATION

CITY OF BERKELEY
FIRE HOUSE NO. 5
TRUCK 5, ENGINE 5, MEDIC 5
04/24/2023

10. FIRE HOUSE PUBLIC LOBBY (180 S.F.)
SCALE: 1/8"=1'-0"

11. FIRE HOUSE PUBLIC RESTROOM (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER OFFICES

Page 141 of 306 ends
Page 241 ends

| 93

BERKELEY FIRE DEPARTMENT MASTER PLAN
12'-0"
10'-0"

LATERAL
FILES

LATERAL
FILES
17'-0"
F
TV

LATERAL
FILES
F
F
F
14'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 5
TRUCK 5, ENGINE 5, MEDIC 5
04/24/2023

12. WATCH OFFICE (238 S.F.)
SCALE: 1/8"=1'-0"

13. CAPTAIN'S OFFICE (120 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER OFFICES

Page 142 of 306 ends
Page 242 ends

| 94

BERKELEY FIRE DEPARTMENT MASTER PLAN
18'-0"
21'-0"
8'-0"
MW
COFFEE
REF.A REF.B
R
+42"+34"
DINING
HOUSE
PANTRY
PANTRY
C
PANTRY
B REF.C HOUSE
REF.

PANTRY
A
DW
DW T
TV
PATIO

DAYROOM

SEATING
FOR 12
12'-0"
21'-0"

KITCHEN

CITY OF BERKELEY
FIRE HOUSE NO. 5
TRUCK 5, ENGINE 5, MEDIC 5
04/24/2023

FIRE HOUSE - FIREFIGHTER QUARTERS

14. KITCHEN (378 S.F.)
SCALE: 1/8"=1'-0"

15. DINING AREA (252 S.F.)
SCALE: 1/8"=1'-0"

Page 143 of 306 ends
Page 243 ends

| 95

BERKELEY FIRE DEPARTMENT MASTER PLAN
24'-0"
DINING
TV
12 RECLINERS

ENTERTAINMENT
CENTER

WORKSTATION
30'-0"

BOOK SHELVING
W D
14'-0"
FULL HT.

STORAGE

LAUNDRY
SINK
10'-0"

MOP SINK

MOP RACK

CITY OF BERKELEY
FIRE HOUSE NO. 5
TRUCK 5, ENGINE 5, MEDIC 5
04/24/2023

16. DAYROOM (720 S.F.)
SCALE: 1/8"=1'-0"

17. LAUNDRY ROOM (140 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

Page 144 of 306 ends
Page 244 ends

| 96

BERKELEY FIRE DEPARTMENT MASTER PLAN
(3) 24"X30"
LOCKERS, TYP.

TV
A
9'-0"
8'-6"
TV

XL TWIN BED

DESK/NIGHT STAND

HALLWAY
B C
A B C
9'-0"
9'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 5
TRUCK 5, ENGINE 5, MEDIC 5
04/24/2023

18. FIREFIGHTER BEDROOM - 9 (689 S.F.)
SCALE: 1/8"=1'-0"

19. FIREFIGHTER BATHROOM - ADA (81 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

Page 145 of 306 ends
Page 245 ends

| 97

BERKELEY FIRE DEPARTMENT MASTER PLAN
10'-0"
11'-0"
TV
A
B C
(4) 30"X30"
LOCKERS, TYP.
5'-0"
9'-0"
10'-0"
8'-0"
8'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 5
TRUCK 5, ENGINE 5, MEDIC 5
04/24/2023

21. CAPTAIN BEDROOM, BATHROOM AND WORK AREA, ACCESSIBLE - 2 (500 S.F.) SCALE: 1/8"=1'-0"

20. FIREFIGHTER BATHROOM - 4 (256 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

Page 146 of 306 ends
Page 246 ends

| 98

BERKELEY FIRE DEPARTMENT MASTER PLAN
9'-0"
12'-0"

FIRE SPRINKLER
RISER

WATER HEATER
HVAC EQUIP.
12'-0"
9'-0"
MAIN SERV.

PANEL

SUB-PANELS

FIRE ALARM
PANEL
14'-0"
10'-0"
RADIO EQUIP.

SECURITY SYS.

TEL. SERVICE

RACKS & DATA

SERVER HUB

CITY OF BERKELEY
FIRE HOUSE NO. 5
TRUCK 5, ENGINE 5, MEDIC 5
04/24/2023

22. MECHANICAL ROOM (108 S.F.)
SCALE: 1/8"=1'-0"

23. ELECTRICAL ROOM (108 S.F.)
SCALE: 1/8"=1'-0"

24. COMMUNICATIONS ROOM (140 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - UTILITY SUPPORT/VERTICAL CIRCULATION

Page 147 of 306 ends
Page 247 ends

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 99

EXISTING
FIRE STATION 5

EXISTING

PARKING
AREA

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
P:\2823.01 Berkeley Fire Service Master Plan-S&S\06 Design\3.1 Pre-Design\3.1.2 REVIT + CAD\Site-Floor Diagrams\Station No. 5\STATION 5 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 5 - SITE PLAN (OPTION 1 - BLDG. RENOVATION & ADDITIONAL AREA) 2680 SHATTUCK AVENUE, BERKELEY, CA 94704

SITE / FIRST FLOOR DIAGRAM
SCALE: 1/64" = 1'-0"
DERBY ST.

SHATTUCK AVE.

CARLETON ST.

EXISTING LOT AREA: 17,300 S.F.

FIRE STATION NO. 5 LEGEND:
2 STORY BUILDING

EXISTING BUILDING AREA
(E) FIRE
STATION 5

03.17.2023

Page 148 of 306 ends
Page 248 ends

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 100
(E)
LOBBY
(E) WATCH
OFFICE
(E) H.C.

TOILET
(E) STAIR
(N) LAUNDRY/
DECON
(N) CAPT.

OFFICE
(N)

KITCHEN
(E)

DAYROOM
(E) CORRIDOR
(N) CORRIDOR
(N)
STAIR
(E) CORRIDOR
(E) APPARATUS BAYS 1 & 2
(N) APPARATUS BAY 3
(N) TURNOUT GEAR
(N)
DINING
(E) CORRIDOR
UTILITY TRUCK RESERVE ENGINE MEDIC 5
FIRE ENGINE 5

AIR UNIT
TYPE III 4X4
FIRE TRUCK 5
(E) FF
BDRM. 1
(N) ADA

BATHROOM
(N)

STORAGE
(N) FITNESS
(N) FF
BDRM. 2
(N) FF
BDRM. 3
(N) FF
BDRM. 6
(N) FF
BDRM. 8
(N) FF
BDRM. 7
(N) CAPT.

BEDROOM

W/ WORK

AREA & ADA

BATHROOM
(N) FF
BDRM. 5
(N) FF
BDRM. 4
(N) FF
BDRM. 9
(N) CAPT. BEDROOM

W/ WORK AREA &

ADA BATHROOM
(N)

STORAGE

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
P:\2823.01 Berkeley Fire Service Master Plan-S&S\06 Design\3.1 Pre-Design\3.1.2 REVIT + CAD\Site-Floor Diagrams\Station No. 5\STATION 5 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 5 - FLOOR PLAN (OPTION 1 - BLDG. RENOVATION & ADDITIONAL AREA) 2680 SHATTUCK AVENUE, BERKELEY, CA 94704
EXISTING SECOND FLOOR AREA:

EXISTING FIRST FLOOR AREA:

EXISTING TOTAL BLDG. AREA:

ADDED SECOND FLOOR AREA:
1,132 S.F.
8,404 S.F.
9,536 S.F.
3,004 S.F.

FIRE STATION NO. 5 LEGEND:

FIRST FLOOR DIAGRAM
SCALE: 1/16" = 1'-0"

SECOND FLOOR DIAGRAM
SCALE: 1/16" = 1'-0"
2 STORY BUILDING

EXISTING BUILDING AREA

ADDED BUILDING AREA

RENOVATION AREA

03.17.2023

Page 149 of 306 ends
Page 249 ends

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 101
TANDEM

PARKING
(10 SPACES)
APPARATUS BAY SUPPORT + UTILITY

APPARATUS
BAY SUPPORT + UTILITY
+VERTICAL CIRCULATION

OFFICES
APPARATUS BAY (5 BAYS)

UTILITY TRUCK

BC VEHICLE - FUTURE

OR RESERVE ENGINE
MEDIC 5
FIRE TRUCK 5
FIRE ENGINE 5

AIR UNIT
TYPE III 4X4

LIVING QUARTERS
+ FITNESS +
VERT. CIRCULATION

OFFICES

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
P:\2823.01 Berkeley Fire Service Master Plan-S&S\06 Design\3.1 Pre-Design\3.1.2 REVIT + CAD\Site-Floor Diagrams\Station No. 5\STATION 5 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 5 - OPTION 2 (NEW BUILDING & EXISTING PARKING AREA) 2680 SHATTUCK AVENUE, BERKELEY, CA 94704

SITE / FIRST FLOOR DIAGRAM
SCALE: 1/64" = 1'-0"
DERBY ST.

SHATTUCK AVE.

CARLETON ST.

EXISTING LOT AREA:

PROPOSED SECOND FLOOR AREA:

PROPOSED FIRST FLOOR AREA:

PROPOSED TOTAL BLDG. AREA:

FIRE STATION NO. 5
17,300 S.F.
7,099 S.F.
9,884 S.F.
16,983 S.F.
2 STORY BUILDING

SECOND FLOOR DIAGRAM
SCALE: 1/32" = 1'-0"

03.17.2023

Page 150 of 306 ends
Page 250 ends

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 102

LIVING QUARTERS
+ FITNESS +
VERT. CIRCULATION

OFFICES
RAMP
DN
RAMP
UP
APPARATUS BAY SUPPORT + UTILITY

APPARATUS
BAY SUPPORT + UTILITY
+VERTICAL CIRCULATION

OFFICES
APPARATUS BAY (5 BAYS)

UTILITY TRUCK

BC VEHICLE - FUTURE

OR RESERVE ENGINE
MEDIC 5
FIRE TRUCK 5
FIRE ENGINE 5

AIR UNIT
TYPE III 4X4

RAMP UP

RAMP DN
(20) PARKING
SPACES

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
P:\2823.01 Berkeley Fire Service Master Plan-S&S\06 Design\3.1 Pre-Design\3.1.2 REVIT + CAD\Site-Floor Diagrams\Station No. 5\STATION 5 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 5 - OPTION 3 (NEW BLDG. W/ BASEMENT PARKING) 2680 SHATTUCK AVENUE, BERKELEY, CA 94704

SITE / FIRST FLOOR DIAGRAM
SCALE: 1/64" = 1'-0"
DERBY ST.

SHATTUCK AVE.

CARLETON ST.

EXISTING LOT AREA:

PROPOSED SECOND FLOOR AREA:

PROPOSED FIRST FLOOR AREA:

PROPOSED BASEMENT PARKING:

PROPOSED TOTAL BLDG. AREA:

FIRE STATION NO. 5
17,300 S.F.
7,099 S.F.
9,884 S.F.
9,963 S.F.
26,946 S.F.
2 STORY BUILDING

SECOND FLOOR DIAGRAM
SCALE: 1/32" = 1'-0"

BASEMENT PARKING DIAGRAM
SCALE: 1/32" = 1'-0"

03.17.2023

Page 151 of 306 ends
Page 251 ends

FIRE STATION 6

Page 152 of 306 ends
Page 252 ends

| 103
DRAFT
MAY 08, 2023

BERKELEY FIRE DEPARTMENT MASTER PLAN

PROJECT DESCRIPTION
The existing Fire House No. 6 is a one story, 4,596 SF station and was originally designed to provide operational space and living quarters for two personnel in the 1960’s. The facility was seismically retrofitted and expanded in the 1990’
s. The fire station currently houses 3 personnel per shift with a single unit, Engine 6 (3). The staffing is anticipated to increase to 4 personnel per shift.

Because this station is not anticipated to add a new unit, only a new staff member, it was a strong candidate for renovation and addition The recommended solution includes:

1. Renovate the entire station and expand to 6,312 SF to provide a private station office, dedicated sleeping rooms, turnout storage and a dedicated fitness room.

The ROM Project Budget for the Recommended Option is $12-16M; not including escalation beyond 2024.

CITY OF BERKELEY
FIRE HOUSE NO. 6
999 CEDAR STREET, BERKELEY , CA 94710
CEDAR ST.

NINTH ST.

EIGHTH ST.

Page 153 of 306 ends
Page 253 ends

| 104

BERKELEY FIRE DEPARTMENT MASTER PLAN
Current Future
34 00
34 No. Type of Space Space Attributes
Program Size
Firefighter Parking 8 firefighter parking spaces, secure and separate from public parking
2,000 10'x20' ea.

Visitor Parking One regular and one ADA adjacent to entrance, shared with other public parking areas.
600 10' x 20
Apparatus Washing Are
aAdjacent to hydrant for refill and testing; locate
at rear of App. Bays; provide clarifier for run‐off
0 rear apron
Hose Maintenance Area Use rear apron area for cleaning hose; roll wet and store on apparatus
0 rear apron
Yard Hydrant Located at rear yard 0 rear apron
Generator Area Located at rear yard 150 10'x15'
Fueling Area Above Grade Convault System ‐ 500 GA 240 12' x 20' Trash Enclosure Exterior access for service; space for dumpster and recycling bins, Covered
150 10'x15'
Flagpole Flagpole area with lighting 25 5'x5'
Outdoor Patio or Deck Outdoor uses; adjacent to Kitchen 200 10'x20' No. Type of Space Space Attributes
FIRE HOUSE ‐ APP BAY/APP BAY SUPPORT Replacement
Program Size
1 Apparatus Bay (One
Engine, Reserve Engine)
Engine and Reserve Engine. Systems include
tailpipe exhaust,  power and air cord drops to
each vehicle; electric heating system; night
lighting; bi‐folding auto‐close doors; trench drains
2,560 (2) 20' x 64'     2,037
2 Medical Supply Closet Heavy Duty Shelving; medical supplies off  of apparatus bay.
24 3' x 8' 26
3 Clean Up  Clean‐up sink, shelving, Alcove in bay. 18 3' x 6' NIC 4 Equipment Storage Yard equi pment, bike storage (LEED Requirement), compressor
64 8' x 8' NIC
Renovation SF
Fire House No. 6
Engine 6, Reserve Engine
999 Cedar Street
CONCEPTUAL SPACE NEEDS OUTLINE
Fire  House Company Make‐up ‐ Staffing Per shift
Engine 6 ‐ Captain, Engineer, Firefighter/Paramedic
Reserve Engine
TOTAL CURRENT AND FUTURE STAFFING:

SITE OPERATIONS
Square Footage
Square Footage
Fire House No. 6
Berkeley Fire Department
Final Space Needs 3/21/2023 Page 1 of 3

Page 154 of 306 ends
Page 254 ends

| 105

BERKELEY FIRE DEPARTMENT MASTER PLAN
No. Type of Space Space Attributes
FIRE HOUSE ‐ APP BAY/APP BAY SUPPORT CONTINUED Replacement Program Size
5 Turnout Gear Room Tw o lockers for each assigned personnel  (4 Personnel per day x 3 = 12 x 2= 24 lockers); four
unassigned for 28 total lockers. Power at each
locker, continuous exhaust fan, floor drain, heavy
duty shelving; wildland gear bags.  Dirty area in
room with Extractor and Dryer, decon shower
and hanging area.  Part of response return path.
648 24' x 27' 583
6 Janitor Room Service sink, mop  rack; janitorial supplies; 48 6' x  8' inc. in T.O. 7 Work Shop Alcove Work bench/shop  area for vise, peg board, tool storage with large flat work surface, Misc.
equipment storage , tool chest, Full height
storage cabinet, shop sink and eyewash.
120 4' x 30' NIC
8 Firefighter Restroom Fire fight er  toilet and sink, off of apparatus bay 64 8' x 8' 55 9 Fitness Room  Dedicated Fitness Room 624 24' x 26' 393 Fire House ‐ App Bay/Support Subtotal 4,170 3,094
No. Type of Space Space Attributes
FIRE HOUSE ‐ FIREFIGHTER OFFICES Replacement
Program Size
10 Fire House Public Lobby Lobby with seating; adjacent to the public restroom.   Service window separation between
Watch Office and lobby.  Alcove in Lobby for
Blood Pressure and other wellness checks.
180 12' x 15' NIC
11 Fire House Public
Restroom
One All Gender Restroom, accessible, off of
Lobby
64 8' x 8' NIC
12 Watch Office  Workstations for  2‐persons; provide space for lateral file cabinets (one cabinet per company)
copy machine and office supply storage, book
shelving; conference function
144 12' x 12' 127
13 Captains Office  Workstation for 1‐person; provide space for lateral file cabinets.
120 10' x 12' NIC
Fire House ‐ Firefighter Offices Subtotal 508
No. Type of Space Space Attributes
FIRE HOUSE ‐ FIREFIGHTER QUARTERS Replacement
Program Size
14 Kitchen 3‐refrigerators; 3‐shift pantries; 1‐house pantry and refrigerator; 1‐dishwasher; electric induction
range/oven with hood; large microwave; large,
12" deep sink  with disposer; prep sink at island;
trash and recycling areas; coffer service area;
open to Dining Area
378 18' x 21' 245
Renovation SF
Renovation SF
Renovation SF
Square Footage
Square Footage
Square Footage
Fire House No. 6
Berkeley Fire Department
Final Space Needs 3/21/2023 Page 2 of 3

Page 155 of 306 ends
Page 255 ends

| 106

BERKELEY FIRE DEPARTMENT MASTER PLAN
15 Dining Area Seating for 6 persons; wall‐mounted TV; open to kitchen; open to Day Room
192 12' x 16' inc. in Kitchen
16 Day Room Seating for 4 with recliner chairs; entertainment center and book shelving; Open to Dining, one
work station along wall.
352 16' x 22' 308
No. Type of Space Space Attributes
FIRE HOUSE ‐ FIREFIGHTER QUARTERS CONTINUED Replacement Program Size
17 Laundry Room Service sink; countertop; janitorial supplies; mop rack, Washer/Dryer
140 10' x 14' NIC
18 Firefighter Bedroom 3‐separate b edrooms each containing desk, chair, wall‐mounted TV, 1 bed with lockers outside
door.
230 8'‐6" x 9' (3)  348
19 Firefighter Bathroom
ADA
1 accessible restroom with shower, sink, toilet 81 9' x 9' 132 20 Firefighter Bathrooms 1 restroom s with shower, sink, toilet 64 8 ' x 8' (1) 76 21 Captain Bedroom,
Bathroom and Work
Area, Accessible
1 bedroom containing desk, chair, wall‐mounted
TV, 1 bed, with accessible in‐suite bathroom.
250 10' x 11'
9' x 10'
5' x 10'
299
Fire House ‐ Firefighter Quarters Subtotal 1,687 1,408
No. Type of Space Space Attributes
UTILITY SUPPORT Replacement
Program Size
22 Mechanical Room HVAC equipment; hot water heater; fire sprinkl er riser
108 9' x 12' NIC
23 Electrical Room Main service panel, fire alarm panel; sub pane ls 108 9' X 12' 27 24 Communications Room Telephone ser vice racks, alert response system hub, data server hub, radio equipment; security
system
140 10' x 14' NIC
UTILITY SUPPORT Subtotal 356 27
Fire House No. 6 : Summary Replacement
Program Renovation SF
Fire House ‐ App Bay/Bay Support Subtotal 4,170 3,094
Fire House ‐ Firefighter Offices Subtotal 508 0
Fire House ‐ Firefighter Quarters Subtotal 1,687 1,408
Utility Support/Vertical Circulation Subtotal 356 27
SUBTOTAL (SF) 6,721 4,529
Circulation at 30% 2,016 1,783
FIRE HOUSE NO. 6: GRAND TOTAL (SF) 8,737 6,312
Square Footage
Renovation SF
Renovation SF
Square Footage
Fire House No. 6
Berkeley Fire Department
Final Space Needs 3/21/2023 Page 3 of 3

Page 156 of 306 ends
Page 256 ends

| 107

BERKELEY FIRE DEPARTMENT MASTER PLAN

AUTOMATIC

FOLDING DOOR,
TYP.

TRENCH DRAIN,
TYP.
40'-0"
20'-0"20'-0"
64'-0"

FIRE ENGINE

RESERVE ENGINE

CITY OF BERKELEY
FIRE HOUSE NO. 6
ENGINE 6 & RESERVE ENGINE
04/24/2023

1. APPARATUS BAY - 2 DRIVE-THROUGH BAYS (2,560 S.F.)
SCALE: 1/16"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 157 of 306 ends
Page 257 ends

| 108

BERKELEY FIRE DEPARTMENT MASTER PLAN
8'-0"
3'-0"

HEAVY DUTY

SHELVING

APPARATUS BAY
6'-0"
3'-0"
S.S. CLEAN-UP SINK

W/ DRAIN BOARD,

HANDS FREE

APPARATUS BAY
8'-0"
8'-0"

COMPRESSOR

YARD TOOLS
BIKE

STORAGE

CITY OF BERKELEY
FIRE HOUSE NO. 6
ENGINE 6 & RESERVE ENGINE
04/24/2023

3. CLEAN-UP (18 S.F.)
SCALE: 1/8"=1'-0"

2. MEDICAL SUPPLY CLOSET (24 S.F.)
SCALE: 1/8"=1'-0"

4. EQUIPMENT STORAGE (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 158 of 306 ends
Page 258 ends

| 109

BERKELEY FIRE DEPARTMENT MASTER PLAN

MOP SINK
& SHELF
2 COMP. SINK
& SHELVING
ABOVE
DECON
SHOWER
24'-0"
(28) 24"X24"X72"
LOCKERS , TYP.

HEAVY DUTY SHELVING
ABOVE, TYP.

SHELVING
ABOVE
(15) 30"X14"
3 HIGH WILD LAND

GEAR BAGS STORAGE
1 28

APPARATUS BAY

HANGING
AREA
HAZMAT
BINS (2)
27'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 6
ENGINE 6 & RESERVE ENGINE
04/24/2023

5. TURNOUT GEAR ROOM (648 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 159 of 306 ends
Page 259 ends

| 110

BERKELEY FIRE DEPARTMENT MASTER PLAN
6'-0"
8'-0"

SHELVING

MOP RACK

SERVICE
SINK
OPEN
BELOW
30'-0"
4'-0"
EQUIP.

STORAGE
TOOL
CHEST

EYEWASH
WORKBENCHFULL HT.

STORAGE
SHOP
SINK
8'-0"
8'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 6
ENGINE 6 & RESERVE ENGINE
04/24/2023

6. JANITOR ROOM (48 S.F.)
SCALE: 1/8"=1'-0"

7. WORKSHOP ALCOVE (120 S.F.)
SCALE: 1/8"=1'-0"

8. FIREFIGHTER RESTROOM (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 160 of 306 ends
Page 260 ends

| 111

BERKELEY FIRE DEPARTMENT MASTER PLAN
24'-0"
26'-0"

TO EXTERIOR
KETTLE
BALL/

STRETCHING

DUMBBELL
RACKS
HI-LOW

DRINKING

FOUNTAIN

EQUIPMENT

STORAGE RACK

EXERCISE
BIKES
BACK

EXTENSION

ELLIPTICAL

MACHINE

TREADMILL

CITY OF BERKELEY
FIRE HOUSE NO. 6
ENGINE 6 & RESERVE ENGINE
04/24/2023

9. FITNESS ROOM (624 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 161 of 306 ends
Page 261 ends

| 112

BERKELEY FIRE DEPARTMENT MASTER PLAN
15'-0"
12'-0"

ENTRANCE

TO MEETING ROOM &

GENDER NEUTRAL

ACCESSIBLE RESTROOM

BLOOD PRESSURE
& WELLNESS CHECKS

TO WATCH
OFFICE
8'-0"

TO PUBLIC
LOBBY
8'-0"
BABY

CHANGING

STATION

CITY OF BERKELEY
FIRE HOUSE NO. 6
ENGINE 6 & RESERVE ENGINE
04/24/2023

10. FIRE HOUSE PUBLIC LOBBY (180 S.F.)
SCALE: 1/8"=1'-0"

11. FIRE HOUSE PUBLIC RESTROOM (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER OFFICES

Page 162 of 306 ends
Page 262 ends

| 113

BERKELEY FIRE DEPARTMENT MASTER PLAN
12'-0"
10'-0"

LATERAL
FILES

LATERAL
FILES
TV

LATERAL
FILES
12'-0"
12'-0"
F F

FAX PRINT/
COPIER

TO PUBLIC
LOBBY

CITY OF BERKELEY
FIRE HOUSE NO. 6
ENGINE 6 & RESERVE ENGINE
04/24/2023

12. WATCH OFFICE (144 S.F.)
SCALE: 1/8"=1'-0"

13. CAPTAIN'S OFFICE (120 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER OFFICES

Page 163 of 306 ends
Page 263 ends

| 114

BERKELEY FIRE DEPARTMENT MASTER PLAN
18'-0"
21'-0"
8'-0"
MW
COFFEE
REF.A REF.B
R
+42"+34"
DINING
HOUSE
PANTRY
PANTRY
C
PANTRY
B REF.C HOUSE
REF.

PANTRY
A
DW T
TV
PATIO

DAYROOMSEATING
FOR6
12'-0"
16'-0"

KITCHEN

CITY OF BERKELEY
FIRE HOUSE NO. 6
ENGINE 6 & RESERVE ENGINE
04/24/2023

FIRE HOUSE - FIREFIGHTER QUARTERS

14. KITCHEN (378 S.F.)
SCALE: 1/8"=1'-0"

15. DINING AREA (192 S.F.)
SCALE: 1/8"=1'-0"

Page 164 of 306 ends
Page 264 ends

| 115

BERKELEY FIRE DEPARTMENT MASTER PLAN
16'-0"

DINING TV
4 RECLINERS ENTERTAINMENT
CENTER

WORKSTATION
22'-0"

BOOK SHELVING
W D
14'-0"
FULL HT.

STORAGE

LAUNDRY
SINK
10'-0"

MOP SINK

MOP RACK

CITY OF BERKELEY
FIRE HOUSE NO. 6
ENGINE 6 & RESERVE ENGINE
04/24/2023

16. DAYROOM (352 S.F.)
SCALE: 1/8"=1'-0"

17. LAUNDRY ROOM (140 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

Page 165 of 306 ends
Page 265 ends

| 116

BERKELEY FIRE DEPARTMENT MASTER PLAN
9'-0"
8'-6"
(3) 24"X30"
LOCKERS, TYP.

TV
A B C
TV

XL TWIN BED

DESK/NIGHT STAND

HALLWAY
A B C
9'-0"
9'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 6
ENGINE 6 & RESERVE ENGINE
04/24/2023

18. FIREFIGHTER BEDROOM - 3 (230 S.F.)
SCALE: 1/8"=1'-0"

19. FIREFIGHTER BATHROOM - ADA (81 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

Page 166 of 306 ends
Page 266 ends

| 117

BERKELEY FIRE DEPARTMENT MASTER PLAN
10'-0"
11'-0"
TV
A
B C
(4) 30"X30"
LOCKERS, TYP.
5'-0"
9'-0"
10'-0"
8'-0"
8'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 6
ENGINE 6 & RESERVE ENGINE
04/24/2023

21. CAPTAIN BEDROOM & ACCESSIBLE BATHROOM (250 S.F.)
SCALE: 1/8"=1'-0"

20. FIREFIGHTER BATHROOM (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

Page 167 of 306 ends
Page 267 ends

| 118

BERKELEY FIRE DEPARTMENT MASTER PLAN
9'-0"
12'-0"

FIRE SPRINKLER
RISER

WATER HEATER
HVAC EQUIP.
12'-0"
9'-0"
MAIN SERV.

PANEL

SUB-PANELS

FIRE ALARM
PANEL
14'-0"
10'-0"
RADIO EQUIP.

SECURITY SYS.

TEL. SERVICE

RACKS & DATA

SERVER HUB

CITY OF BERKELEY
FIRE HOUSE NO. 6
ENGINE 6 & RESERVE ENGINE
04/24/2023

FIRE HOUSE - UTILITY SUPPORT/VERTICAL CIRCULATION

22. MECHANICAL ROOM (108 S.F.)
SCALE: 1/8"=1'-0"

23. ELECTRICAL ROOM (108 S.F.)
SCALE: 1/8"=1'-0"

24. COMMUNICATIONS ROOM (140 S.F.)
SCALE: 1/8"=1'-0"

Page 168 of 306 ends
Page 268 ends

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 119
100'

69.50'

FIRE ENGINE

RESERVE ENGINE
(E) DAYROOM
(E)

APPARATUS
ROOM
(E) KITCHEN
(E)
OFFICE
(E)
ELEC.
(E)
H.C
TOILET
(E)

APPARATUS
ROOM
(N) FF
BDRM. 4
(N) FF
BDRM. 2
(N) FF

BATHROOM
(E) CORRIDOR 2
(E) FF
BDRM. 3
(E) CORRIDOR 1
(N) FITNESS
(N) TURNOUT GEAR

FIRE ENGINE

RESERVE ENGINE
(N) STATION
OFFICE
(N) CAPT. BEDROOM,

BATHROOM & WORK AREA,

ACCESSIBLE
(N) ADA

BATHROOM
(N) INTERN
BDRM.

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
P:\2823.01 Berkeley Fire Service Master Plan-S&S\06 Design\3.1 Pre-Design\3.1.2 REVIT + CAD\Site-Floor Diagrams\Station No. 6\STATION 6 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 6 - BLDG. RENOVATION & ADDITIONAL AREA 999 CEDAR STREET, BERKELEY, CA 94710
CEDAR ST.

NINTH ST.

EIGHTH ST.

FIRE STATION NO. 6
LEGEND:
(E) FIRE STATION 6

SITE PLAN DIAGRAM
SCALE: 1/64" = 1'-0"

FLOOR PLAN DIAGRAM
SCALE: 1/16" = 1'-0"

EXISTING BUILDING AREA

ADDED BUILDING AREA

RENOVATION AREA

DEMO (E) STRUCTURE
EXISTING LOT AREA:

EXISTING BUILDING AREA:

ADDED BUILDING AREA:

TOTAL BUILDING AREA:
26,000 S.F.
4,596 S.F.
1,990 S.F.
6,312 S.F.

DEMO (E) TOWER .CREATE

ADDITIONAL PARKING SPACES

REMOVE (E) STRUCTURES

03.17.2023

Page 169 of 306 ends
Page 269 ends

FIRE STATION 7

Page 170 of 306 ends
Page 270 ends

| 120
DRAFT
MAY 08, 2023

BERKELEY FIRE DEPARTMENT MASTER PLAN

PROJECT DESCRIPTION
The existing Fire House No. 7 is a two story, 6,920 SF station and was designed to provide operational space and living quarters for four personnel in 2005. The fire station currently houses 6 personnel per shift during wildfire season. Appar
atus at the site include Engine 7(3) and surge unit Type VI with surge staffing. The staffing is anticipated to increase to 8 personnel per shift.

Because this station is not anticipated to add a new unit, only a new staff members, it is a strong candidate for renovation and addition The recommended solution includes:

1. Renovate a portion of the first level to provide dedicated turnout storage and decontamination space. Expand the second level to provide additional sleeping rooms and restrooms; and a d e d i c a t e d fi t n e s s r o o m . T h e e x p a n s i o n a r e a i s p r o p o s e d t o b e 1 , 0 8 0 S F a n d w i l l o c c u r o v e r t h e e x i s ti n g second level roof deck. The total building SF will increase to 8,000SF.

The ROM Project Budget for the Recommended Option is $10-13M; not including escalation beyond 2024.

CITY OF BERKELEY
FIRE HOUSE NO. 7
3000 SHASTA ROAD, BERKELEY , CA 94708

CITY OF BERKELEY

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
CURRENT NUMBER OF STAFF: X
CURRENT APPARATUS ENGINES:
· ENGINE SEVEN
· EBRPD ENGINE (SEASONA
FIRE STATION NO. 7
3000 SHASTA ROAD, BERKELEY, CA 94708
FIRE STATION NO.7

EXISTING SITE PLAN DIAGRAM
SCALE: 1/64" = 1'-0"
SHASTA RD.

HILL RD.

PARK GATE

PARK GATE
GRIZZLY PEAK BLVD.

Page 171 of 306 ends
Page 271 ends

| 121

BERKELEY FIRE DEPARTMENT MASTER PLAN
Current Future
34 34
00 00
00 Medic Intern 11
79 No. Type of Space Space Attributes
Program Size
Firefighter Parking 18 firefighter parking spaces, secure and separate from public parking
3,600 10'x20' ea.

Visitor Parking One regular and one ADA adjacent to entrance, shared with other public parking areas.
200 10' x 20
Apparatus Washing Area Adjacent to hydrant for refill and testing; locate at rear of App. Bays; provide clarifier for run‐off
0 rear apron
Hose Maintenance Area Use rear apron area for cleaning hose; roll wet and store on apparatus
0 rear apron
Yard Hydrant Located at rear yard 0 rear apron
Generator Area Located at rear yard 150 10'x15'
Fueling Area Above Grade Convault System ‐ 500 GA 240 12' x 20' Trash Enclosure Exterior access for service; space for dumpster and recycling bins, Covered
150 10'x15'
Flagpole Flagpole area with lighting 25 5'x5'
Outdoor Patio or Deck Outdoor uses; adjacent to Kitchen 200 10'x20' Fire House No. 7
Engine 7, Type VI (Cross staffed)
3000 Shasta Road
CONCEPTUAL SPACE NEEDS OUTLINE
Fire  House Company Make‐up ‐ Staffing Per shift
Engine 7 ‐ Captain, Engineer, Firefighter/Paramedic
TOTAL CURRENT AND FUTURE STAFFING:

Water Tender (2 total)
Surge Unit Type VI (cross‐staffed)
Reserve Engine Type I
Polaris ( 2 total)
Square Footage
SITE OPERATIONS
Fire House No. 7
Berkeley Fire Department
Final Space Needs 3/21/2023 Page 1 of 3

Page 172 of 306 ends
Page 272 ends

| 122

BERKELEY FIRE DEPARTMENT MASTER PLAN
No. Type of Space Space Attributes
FIRE HOUSE ‐ APP BAY/APP BAY SUPPORT Replacement
Program Size
1 Apparatus Bay (One
Engine, Type 3 Engine)
Two apparatus bays
Engine, Surge Unit Type VI, Reserve Engine Type I, Polaris Vehicle (x2), Water Tender (x2). Systems include tailpipe exhaust,  power and air cord drops to each vehicle;
electric heating system; night lighting; bi‐folding auto‐ close doors; trench drains
3,280 (2) 20'x 82'      2190
2 Medical Supply Closet Heavy Duty Shelving; medical supplies off of apparatus b
24 3' x 8' 34
3 Clean Up  Clean‐up sink, shelving, Alcove in bay. 18 3' x 6' 18 4 Equipment Storage Yard equipment, bike storage (LEED Requirement), compressor
64 8' x 8' inc. in medical
closet
5 Turnout Gear Room Two lockers for each assigned personnel  (5 Personnel per day x 3 = 15 x 2= 30 lockers); One locker for each surge team member (four  personnel x 3= 12), four unassigned
for 46 total lockers. Power at each locker, continuous
exhaust fan, floor drain, heavy duty shelving; wildland gear bags.  Dirty area in room with Extractor and Dryer, decon shower and hanging area.  Part of response return path.
840 24' x 35' 521
6 Janitor Room Service sink, mop rack; janitorial supplies; 48 6' x 8' 40 7 Work Shop Alcove Work bench/shop area for vise, peg board, tool storage with large flat work surface, Misc. equipment storage , tool chest, Full height storage cabinet, shop sink and
eyewash.
120 4' x 30' 173
8 Firefighter Restroom Fire fighter  toilet and sink, off of apparatus bay 64 8' x 8' 72 9 Fitness Room  Dedicated Fitness Room 624 24' x 26' 723 Fire House ‐ App Bay/Support Subtotal 5,082 3,771
No. Type of Space Space Attributes
FIRE HOUSE ‐ FIREFIGHTER OFFICES Replacement
Program Size
10 Fire House Public Lobby Lobby with seating; adjacent to the public restroom.

Service window separation between Watch Office and
lobby.  Alcove in Lobby for Blood Pressure and other
wellness checks.
180 12' x 15' 108
11 Fire House Public
Restroom
One All Gender Restroom, accessible, off of Lobby 64 8'x8' NIC 12 Watch Office  Workstations for 2‐persons; provide space for lateral file cabinets (one cabinet per company) copy machine and
office supply storage, book shelving; conference function 144 12' x 12' 196
13 Captains Office (Assume
there will only be one
house captain)
Workstation for 1‐person; provide space for lateral file cabinets.
120 10' x 12' inc. in Watch
Office
Fire House ‐ Firefighter Offices Subtotal 508 304
Square Footage
Square Footage
Renovation SF
Renovation SF
Fire House No. 7
Berkeley Fire Department
Final Space Needs 3/21/2023 Page 2 of 3

Page 173 of 306 ends
Page 273 ends

| 123

BERKELEY FIRE DEPARTMENT MASTER PLAN
No. Type of Space Space Attributes
FIRE HOUSE ‐ FIREFIGHTER QUARTERS Replacement
Program Size
14 Kitchen 3‐refrigerators; 3‐shift pantries; 1‐house pantry and refrigerator; 1‐dishwasher; electric induction range/oven with hood; large microwave; large, 12" deep sink  with
disposer; prep sink at island; trash and recycling areas; coffer service area; open to Dining Area
378 18' x 21' 246
15 Dining Area Seating for 9 persons; wall‐mounted TV; open to kitchen; open to Day Room
240 12' x 20' 246
16 Day Room Seating for 9 with recliner chairs; entertainment center and book shelving; Open to Dining, one work station along wall.
528 22' x 24' 475
17 Laundry Room Service sink; countertop; janitorial supplies; mop rack, Washer/Dryer
140 10' x 14' 157
18 Firefighter Bedroom 4‐separate bedrooms each containing desk, chair, wall‐ mounted TV, 1 bed with lockers outside door.
306 8'‐6" x 9' (4)
19 Surge Unit Bedroom 1 bedroom containing (4) murphy beds 253 11' x 23' 240 20 Firefighter Bathroom
ADA
1 accessible restroom with shower, sink, toilet 81 9' x 9' 81 21 Firefighter Bathrooms 3 restrooms with shower, sink, toilet 192 8' x 8' (3) 285 22 Captain Bedroom,
Bathroom and Work
Area, Accessible
1 bedroom containing desk, chair, wall‐mounted TV, 1
bed, with accessible in‐suite bathroom.
250 10' x 11'         5'
x 10'             10'
x 9'
161
Fire House ‐ Firefighter Quarters Subtotal 2,368 1,891
No. Type of Space Space Attributes
UTILITY SUPPORT/VERTICAL CIRCULATION Replacement
Program Size
23 Mechanical Room HVAC equipment; hot water heater; fire sprinkler riser 108 9' x 12' 40 24 Electrical Room Main service panel, fire alarm panel; sub panels 108 9' X 12' 22 25 Communications Room Telephone service racks, alert response system hub, data server hub, radio equipment; security system
140 10' x 14' NIC
26 Stairs (2x) for each level.  Two stairways from the second floor for exiting
576 18' x 8' 144
27 Fire House Elevator Elevator and machine room 240 8' x 10' (3) 100 Utility Support/ Vertical Circulation Subtotal 1,172 306 Engine 7, Type VI Cross Staffed: Summary Replacement
Program Renovation SF
Fire House ‐ App Bay/Bay Support Subtotal 5,082 3,771
Fire House ‐ Firefighter Offices Subtotal 508 304
Fire House ‐ Firefighter Quarters Subtotal 2,368 1,891
Utility Support/Vertical Circulation Subtotal 1,172 306 BUILDING SUBTOTAL (SF) 9,130 6,272
Circulation at 30% 2,739 1,728
Engine 7, Type VI Cross Staffed: GRAND TOTAL (SF) 11,869 8,000 Square Footage
Square Footage
Renovation SF
Renovation SF
Fire House No. 7
Berkeley Fire Department
Final Space Needs 3/21/2023 Page 3 of 3

Page 174 of 306 ends
Page 274 ends

| 124

BERKELEY FIRE DEPARTMENT MASTER PLAN

AUTOMATIC

FOLDING DOOR,
TYP.

TRENCH DRAIN,
TYP.
40'-0"
20'-0"20'-0"
82'-0"

FIRE ENGINE

RESERVE ENGINE

TYPE VI WILDLAND UNIT

POLARIS
WATER TENDER (2)

WATER TENDER WHEN
UNIT AT STATION 2

POLARIS

CITY OF BERKELEY
FIRE HOUSE NO. 7
ENGINE 7, TYPE VI (Cross staffed)
04/24/2023

1. APPARATUS BAY - 2 DRIVE-THROUGH BAYS (3,280 S.F.)
SCALE: 1/16"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 175 of 306 ends
Page 275 ends

| 125

BERKELEY FIRE DEPARTMENT MASTER PLAN
8'-0"
3'-0"

HEAVY DUTY

SHELVING

APPARATUS BAY
6'-0"
3'-0"
S.S. CLEAN-UP SINK

W/ DRAIN BOARD,

HANDS FREE

APPARATUS BAY
8'-0"
8'-0"

COMPRESSOR

YARD TOOLS
BIKE

STORAGE

CITY OF BERKELEY
FIRE HOUSE NO. 7
ENGINE 7, TYPE VI (Cross staffed)
04/24/2023

3. CLEAN-UP (18 S.F.)
SCALE: 1/8"=1'-0"

2. MEDICAL SUPPLY CLOSET (24 S.F.)
SCALE: 1/8"=1'-0"

4. EQUIPMENT STORAGE (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 176 of 306 ends
Page 276 ends

| 126

BERKELEY FIRE DEPARTMENT MASTER PLAN

MOP SINK
& SHELF
2 COMP. SINK
& SHELVING
ABOVE
TRENCH
DRAIN
DRYING

CABINET

EXTRACTOR
DECON
SHOWER

APPARATUS
BAY
24'-0"
35'-0"
24'-0"
(46) 24"X24"X72"
LOCKERS, TYP.

HEAVY DUTY SHELVING
ABOVE, TYP.
(15) 30"X14"
3 HIGH WILD LAND

GEAR BAGS STORAGE
HAZMAT
BINS

SHELVING
ABOVE

APPARATUS
BAY

CITY OF BERKELEY
FIRE HOUSE NO. 7
ENGINE 7, TYPE VI (Cross staffed)
04/24/2023

5. TURNOUT GEAR ROOM (840 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 177 of 306 ends
Page 277 ends

| 127

BERKELEY FIRE DEPARTMENT MASTER PLAN
6'-0"
8'-0"

SHELVING

MOP RACK

SERVICE
SINK
OPEN
BELOW
30'-0"
4'-0"
EQUIP.

STORAGE
TOOL
CHEST

EYEWASH
WORKBENCHFULL HT.

STORAGE
SHOP
SINK
8'-0"
8'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 7
ENGINE 7, TYPE VI (Cross staffed)
04/24/2023

6. JANITOR ROOM (48 S.F.)
SCALE: 1/8"=1'-0"

7. WORKSHOP ALCOVE (120 S.F.)
SCALE: 1/8"=1'-0"

8. FIREFIGHTER RESTROOM (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 178 of 306 ends
Page 278 ends

| 128

BERKELEY FIRE DEPARTMENT MASTER PLAN
24'-0"
26'-0"

TO EXTERIOR
KETTLE
BALL/

STRETCHING

DUMBBELL
RACKS
HI-LOW

DRINKING

FOUNTAIN

EQUIPMENT

STORAGE RACK

EXERCISE
BIKES
BACK

EXTENSION

ELLIPTICAL

MACHINE

TREADMILL

CITY OF BERKELEY
FIRE HOUSE NO. 7
ENGINE 7, TYPE VI (Cross staffed)
04/24/2023

9. FITNESS ROOM (624 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - APPARATUS BAY/APPARATUS BAY SUPPORT

Page 179 of 306 ends
Page 279 ends

| 129

BERKELEY FIRE DEPARTMENT MASTER PLAN
15'-0"
12'-0"

ENTRANCE

TO MEETING ROOM &

GENDER NEUTRAL

ACCESSIBLE RESTROOM

BLOOD PRESSURE
& WELLNESS CHECKS

TO WATCH
OFFICE
8'-0"

TO PUBLIC
LOBBY
8'-0"
BABY

CHANGING

STATION

CITY OF BERKELEY
FIRE HOUSE NO. 7
ENGINE 7, TYPE VI (Cross staffed)
04/24/2023

10. FIRE HOUSE PUBLIC LOBBY (180 S.F.)
SCALE: 1/8"=1'-0"

11. FIRE HOUSE PUBLIC RESTROOM (64 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER OFFICES

Page 180 of 306 ends
Page 280 ends

| 130

BERKELEY FIRE DEPARTMENT MASTER PLAN
12'-0"
10'-0"

LATERAL
FILES

LATERAL
FILES
TV

LATERAL
FILES
12'-0"
12'-0"
F F

FAX PRINT/
COPIER

TO PUBLIC
LOBBY

CITY OF BERKELEY
FIRE HOUSE NO. 7
ENGINE 7, TYPE VI (Cross staffed)
04/24/2023

12. WATCH OFFICE (144 S.F.)
SCALE: 1/8"=1'-0"

13. CAPTAIN'S OFFICE (120 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER OFFICES

Page 181 of 306 ends
Page 281 ends

| 131

BERKELEY FIRE DEPARTMENT MASTER PLAN
18'-0"
21'-0"
8'-0"
MW
COFFEE
REF.A REF.B
R
+42"+34"
DINING
HOUSE
PANTRY
PANTRY
C
PANTRY
B REF.C HOUSE
REF.

PANTRY
A
DW T
TV
PATIO

DAYROOM

SEATING
FOR 9
12'-0"
20'-0"

KITCHEN

CITY OF BERKELEY
FIRE HOUSE NO. 7
ENGINE 7, TYPE VI (Cross staffed)
04/24/2023

FIRE HOUSE - FIREFIGHTER QUARTERS

14. KITCHEN (378 S.F.)
SCALE: 1/8"=1'-0"

15. DINING AREA (240 S.F.)
SCALE: 1/8"=1'-0"

Page 182 of 306 ends
Page 282 ends

| 132

BERKELEY FIRE DEPARTMENT MASTER PLAN
24'-0"
DINING
TV9 RECLINERS

ENTERTAINMENT
CENTER

WORKSTATION
22'-0"

BOOK SHELVING
W D
14'-0"
FULL HT.

STORAGE

LAUNDRY
SINK
10'-0"

MOP SINK

MOP RACK

CITY OF BERKELEY
FIRE HOUSE NO. 7
ENGINE 7, TYPE VI (Cross staffed)
04/24/2023

16. DAYROOM (528 S.F.)
SCALE: 1/8"=1'-0"

17. LAUNDRY ROOM (140 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

Page 183 of 306 ends
Page 283 ends

| 133

BERKELEY FIRE DEPARTMENT MASTER PLAN
9'-0"
9'-0"
9'-0"
8'-6"
(3) 24"X30"
LOCKERS, TYP.

TV
A B C
TV

XL TWIN BED

DESK/NIGHT STAND

HALLWAY
A B C
23'-0"
11'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 7
ENGINE 7, TYPE VI (Cross staffed)
04/24/2023

20. FIREFIGHTER BATHROOM - ADA (81 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

18. FIREFIGHTER BEDROOM - 4 (306 S.F.)
SCALE: 1/8"=1'-0"

19. SURGE UNIT BEDROOM (253 S.F.)
SCALE: 1/8"=1'-0"

Page 184 of 306 ends
Page 284 ends

| 134

BERKELEY FIRE DEPARTMENT MASTER PLAN
10'-0"
11'-0"
TV
A
B C
(4) 30"X30"
LOCKERS, TYP.
5'-0"
9'-0"
10'-0"
8'-0"
8'-0"

CITY OF BERKELEY
FIRE HOUSE NO. 7
ENGINE 7, TYPE VI (Cross staffed)
04/24/2023

22. CAPTAIN BEDROOM & ACCESSIBLE BATHROOM (250 S.F.)
SCALE: 1/8"=1'-0"

21. FIREFIGHTER BATHROOM - 3 (192 S.F.)
SCALE: 1/8"=1'-0"

FIRE HOUSE - FIREFIGHTER QUARTERS

Page 185 of 306 ends
Page 285 ends

| 135

BERKELEY FIRE DEPARTMENT MASTER PLAN
9'-0"
12'-0"

FIRE SPRINKLER
RISER

WATER HEATER
HVAC EQUIP.
12'-0"
9'-0"
MAIN SERV.

PANEL

SUB-PANELS

FIRE ALARM
PANEL
14'-0"
10'-0"
RADIO EQUIP.

SECURITY SYS.

TEL. SERVICE

RACKS & DATA

SERVER HUB

CITY OF BERKELEY
FIRE HOUSE NO. 7
ENGINE 7, TYPE VI (Cross staffed)
04/24/2023

FIRE HOUSE - UTILITY SUPPORT/VERTICAL CIRCULATION

23. MECHANICAL ROOM (108 S.F.)
SCALE: 1/8"=1'-0"

24. ELECTRICAL ROOM (108 S.F.)
SCALE: 1/8"=1'-0"

25. COMMUNICATIONS ROOM (140 S.F.)
SCALE: 1/8"=1'-0"

Page 186 of 306 ends
Page 286 ends

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 136

EXISTING

PARKING

EXISTING
H.C. PARKING

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
P:\2823.01 Berkeley Fire Service Master Plan-S&S\06 Design\3.1 Pre-Design\3.1.2 REVIT + CAD\Site-Floor Diagrams\Station No. 7\STATION 7 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
FIRE STATION NO. 7 - SITE PLAN (BUILDING RENOVATION)
3000 SHASTA ROAD, BERKELEY, CA 94708

SITE PLAN DIAGRAM
SCALE: 1/64" = 1'-0"
SHASTA RD.

HILL RD.

PARK GATE

PARK GATE
GRIZZLY PEAK BLVD.

LEGEND:

EXISTING BUILDING AREA
(E) FIRE STATION 7

03.17.2023

Page 187 of 306 ends
Page 287 ends

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 137
(E) DINING (E) KITCHEN (E) ELEV. (E) DAYROOM
(E) FF
BDRM. 3
(E)

LAUNDRY/

STORAGE
(E) ROOF DECK
(E) CAPT.

BEDROOM
(E)
JAN.
(E) FF
BATH
(E) FF
BATH
(N) SURGE UNIT

BEDROOM
(N) FITNESS
(E) FF
BDRM. 2
(E) FF
BDRM. 1
(N) FF
BDRM. 4
(N) FF
BATH
(N) ADA FF
BATH
(E) APPARATUS ROOM
(E) BAY 1
(E) BAY 2(E) SHOP
(E)
OFFICE
(E)
LOBBY(E) ELEV.(N) TURNOUT GEAR
(E) ELEV.

MACHINE
(E) GEN.
(E) MAINT. ACCESS
(E) H.C.

BATH

RESERVE ENGINE

POLARIS POLARIS

FIRE ENGINEWATER TENDER

TYPE VI WILDLAND UNIT

CITY OF BERKELEY
610 16th STREET, SUITE 219, OAKLAND, CA 94612
phone: 510.208.9400
www.marymcgratharchitects.com
P:\2823.01 Berkeley Fire Service Master Plan-S&S\06 Design\3.1 Pre-Design\3.1.2 REVIT + CAD\Site-Floor Diagrams\Station No. 7\STATION 7 - Site-Floor Diagram.dwg

FIRE SERVICE MASTER PLAN

SITE STUDIES
TITLE:
6201 DOYLE STREET, SUITE B,
EMERYVILLE, CA 94608
phone: 510.547.8092 | www.siegelstrain.com
3000 SHASTA ROAD, BERKELEY, CA 94708
EXISTING FIRST FLOOR BUILDING AREA:

EXISTING SECOND FLOOR BUILDING AREA:

TOTAL EXISTING BUILDING AREA:

FIRE STATION NO. 7
LEGEND:
3,967 S.F.
2,953 S.F.
6,920 S.F.
2 STORY BUILDING

EXISTING BUILDING AREA

RENOVATION AREA

FIRST FLOOR PLAN
SCALE: 1/16" = 1'-0"

SECOND FLOOR PLAN
SCALE: 1/16" = 1'-0"

03.17.2023
FIRE STATION NO. 7 - FLOOR PLAN (BUILDING RENOVATION)

SECOND FLOOR BUILDING AREA
EXPANSION:
1,080 S.F.

TOTAL BUILDING AREA RENOVATION: 8,000 S.F.

Page 188 of 306 ends
Page 288 ends

HEADQUARTERS,

TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER

Page 189 of 306 ends
Page 289 ends

| 138
DRAFT
MAY 08, 2023

BERKELEY FIRE DEPARTMENT MASTER PLAN

PROJECT DESCRIPTION
The current BFD Headquarters is located within the Public Safety Building in downtown Berkeley. There is not adequate space at this location for all of the current staff nor the proposed additional staff, WUI division, training classrooms, or the proposed ambulance deployment center.

The r
ecomendation is to relocate the headquarters to a city owned building which is large enough to accommodate the administrative offices, training classrooms, and the ambulance deployment center.

The ROM Project Budget for the Recommended Option is $33-36 not including escalation beyond 2024.

CITY OF BERKELEY

FIRE DEPARTMENT HEADQUARTERS
2100 MARTIN LUTHER KING JR. WAY , BERKELEY , CA 94704

Page 190 of 306 ends
Page 290 ends

| 139

BERKELEY FIRE DEPARTMENT MASTER PLAN
CITY OF BERKELEY
FIRE DEPARTMENT MASTER PLAN
CONCEPTUAL SPACE NEEDS OUTLINE
No. Type of Space Space Attributes
SITE OPERATIONS Program Size
Staff Parking 40? staff parking spaces TBD 10'x20' ea.

Fire Department Vehicles 40?  City Vehicle parking spaces TBD 10'x20' ea.

Visitor Parking 4 Total ‐ One Accessible with ramp 1,000 10'  x 20 Generator Area Located at rear yard 150 10'x15'
Trash Enclosure Exterior access for service; space for dumpster and recycling bins
150 10'x15'
Flagpole Flagpole area with lighting 25 5'x5'
Outdoor Patio Outdoor uses; adjacent to Staff Breakroom 200 10'x20' No. Type of Space Space Attributes
OFFICE OF THE CHIEF,  OPERATIONS and SUPPORT SERVICES Program Size A1 Fire Chief Office Private office, lateral file cabinets, meeting table for 4, shelving
256 16'  x 16'
A2 Communications  Specialist Private  office,  lateral file cabinets, shelving 143 11' x 13' A3 Project  Manager Private Office 132 11'  x 12'
A4 Confidential  Secretary Private office, lateral file cabinets, shelving 132 11' x 12' A5 Deputy Fire Chief  Operations
Office
Private office, lateral file cabinets, meeting over desk, shelving
156 12'  x 13'
A6 Administrative Assistance (2) Open  work stations 160 8' x 10' (2) A7 Deputy Fire Chief  Support Services  Private office, lateral file cabinets, meeting over desk, shelving
156 12'  x 13'
A8 Assistant Fire  Chief   Support
Services
Private office, lateral file cabinets, meeting over desk, shelving
156 12'  x 13'
A9 Assistant Mgmt. Analyst (2) Private  office, lateral file cabinets, shelving 264 11' x 12' (2) A10 Small  Conference Seating for 6‐8; white board 180 15' x 12' OFFICE OF THE CHIEF, OPERATIONS, SUPPORT SERVICES Work Area Subtotal 1,735 Training Division Program Size
T1 Training  Assistant Chief Private office, lateral file  cabinets, meeting over desk, shelving
156 12'  x 13'
T2 Training  Admin. Open work station 80 8' x 10'
T3 Training  Specialist Private Office 132 11'  x 12'
T4 Training  Officer (2) Private office, lateral file cabinets, shelving 264 11' x 12' (2) T5 Training  Support (Interns and
RTO) (4)
Touch down work stations adjacent to plan WUI Captain 144 6' x 6'  (4) T6 Administrative  Assistance (2) Open  work stations 160 8' x 10' (2) T7 Human  Performance Coaches
Strength and Rehab (2)
Private office with area for training table. 336 12' x 14' (2) T8 Human  Performance Coaches
(Nutrition and Behavior)
Private office with area for training table. 336 12' x 14' (2) T9 Small  Conference Seating for 6‐8; white board 180 15' x 12' TRAINING DIVISION Area Subtotal 1,788
Square Footage
Fire Department Administrative Offices and Training Classrooms Ambulance Deployment Center
Fire Department Administrative Offices and Training Classrooms Headquarters
Training Classrooms
Ambulance Deployment Center Printed - 4/25/2023 Page 1 of 6

Page 191 of 306 ends
Page 291 ends

| 140

BERKELEY FIRE DEPARTMENT MASTER PLAN
CITY OF BERKELEY
FIRE DEPARTMENT MASTER PLAN
No. Type of Space Space Attributes
ADMINISTRATION AND FISCAL Program Size
F1 Admin  & fiscal Service Manager Private  office with plan layout desk, lateral file cabinets, shelving
143 11'  x 13'
F2 Associate Mgmt. Analyst (2) Private office, lateral file  cabinets, shelving 264 11' x 12' (2) F3 Accounting  Office Spec. III (four
positions)
Open work stations, lateral file cabinets, shelving,
adjacent to copy, file, supply room
320 8'  x 10' (4)
F4 Office  Specialist II (2) Open work stations, lateral file cabinets, shelving, adjacent to copy, file, supply room
160 8'  x 10' (2)
F5 Budget Associate Management
Analyst
Open work stations, lateral file cabinets, shelving,
adjacent to copy, file, supply room
80 8'  x 10' (1)
F6 Small  Conference Seating for 6‐8; white board 180 15' x 12' ADMINISTRATION AND FISCAL Area Subtotal 1,147
EMS Program Size
EMS1 EMS  Assistant Fire Chief Private office, lateral file  cabinets, shelving 143 11' x 13' EMS2 EMS  Captains (2) Shared Private Office with two desks 156 12'  x 13' EMS3 EMS  Quality Improvement Private  office, lateral file cabinets, shelving 143 11' x 13' EMS4 EMS  Open work Area  95
positions)
EMS Admin. Assistant
EMS CQI
EMS Recruitment/Academy
Interns (2)
Open work stations adjacent to lobby, lateral file
cabinets, shelving, adjacent to copy, file, supply room 400 8'  x 10' (5)
Fire Department EMS Work Area Subtotal 842
Emergency Management Program Size
EM1 Emergency  Manager Program
Manager II
Private office with meeting space over desk, lateral file cabinets, shelving
143 11'  x 13'
EM2 Emergency  Services Coordinator
Open work Area  (3 positions)
Open work stations, lateral file cabinets, shelving,
adjacent to copy, file, supply room
240 8'  x 10' (3)
EM3 Emergency  Planning Support
(interns 2)
Open work stations, lateral file cabinets, shelving,
adjacent to copy, file, supply room
160 8'  x 10' (2)
Fire Department Emergency Management Work Area Subtotal 543 Fire Prevention Program Size
FP1 Fire Marshal Private office with meeting space over desk, lateral file cabinets, shelving
143 11'  x 13'
FP2 Assistant Mgmt. Analyst Private office, lateral file  cabinets, shelving 132 11' x 12' FP3 Deputy Fire Marshal Private office with meeting space over desk.  Layout out space for plan review.
143 11'  x 13'
FP4 Fire Prevention Open Work  Area
Plans Review (Two Positions)
Open Work Area adjacent to  Fire Marshall ; two work
stations and work counter for plan layout, storage area for inactive files.
200 10'  x 10' (2)
FP5 Inspector Open work Area
(Five positions)
Open works station with area for plan layout 400 8' x 10'  (5) FP6 Light Duty Work Stations  (2) Open  works station with area for plan layout 160 8' x 10'  (2) FP7 Library and Storage ‐ Archives Full ‐height shelving 100 10' x 10' FP8 Small  Conference seating for 6‐8; white board 180 15' x 12' Fire Prevention Work Area Subtotal 1,458
Fire Department Administrative Offices and Training Classrooms Headquarters
Training Classrooms
Ambulance Deployment Center Printed - 4/25/2023 Page 2 of 6

Page 192 of 306 ends
Page 292 ends

| 141

BERKELEY FIRE DEPARTMENT MASTER PLAN
CITY OF BERKELEY
FIRE DEPARTMENT MASTER PLAN
No. Type of Space Space Attributes
Wildland Division (WUI) Program Size
WD1 Assistant Chief Private office with meeting space over desk, lateral file cabinets, shelving
143 11'  x 13'
WD2 Office Specialist Open work station, lateral file cabinets, shelving, adjacent to copy, file, supply room
80 8'  x 10' (1)
WD3 WUI  Captain Open work station, lateral file cabinets, shelving, adjacent to copy, file, supply room
80 8'  x 10' (1)
WD4 Vegetation Management Open work  station, lateral file cabinets, shelving, adjacent to copy, file, supply room
80 8'  x 10' (1)
WD5 Inspector Open work Area
(Three positions)
Touch down work stations adjacent to plan WUI Captain 108 6' x 6'  (3) WD6 Field  Coordinator/Imspection
education/Interns (6 TD)
Touch down work stations adjacent to plan WUI Captain 216 6' x 6'  (6) Wildland Division Work Area Subtotal 707
Shared and Support Spaces Program Size
S1 Public  Entry Lobby Interior space for visitor seating;  Reception counter, adjacent to small conference room
168 12'  x 14'
S2 Historic  Display Interior lobby space for the display of BFD Historic artifacts
168 12'  x 14'
S3 Public  Restroom ADA Accessible restrooms adjacent to Lobby,  2 Gender Neutral
128 8'  x 8' x 2
S4 Admin  Workroom/Storage full ‐height shelving, open area for copy machine, central work counter for report assembly, storage for office
supplies, form storage, mail box for each station and
admin. personnel
224 14'x  16'
S5 Large Conference Room seating for 20‐24; storage  cabinets, counter space, white board, Adjacent to Lobby
900 30'  x 30'
S6 Small  Conference seating for 6‐8; white board (adjacent to Lobby) 180 15' x 12' S7 Admin.  Break Room seating for 8; kitchenette, vending 224 14'x16' S8 Staff  Restroom/locker Room ADA Accessible restroom adjacent to break room.  6‐ 36" high lockers.  One restroom/locker room each for men
and women.
384 12'  x 16' (2)
S9 Fitness  Room Space for 5‐6 people to work out at one time. 1,200 30'  x 40' S10 Admin.  Janitors Room Storage for cleaning supplies, vacuum, mop sink with mop rack, mop bucket, paper goods,
48 6'  x 8'
S11 General Storage ‐ Supply Full ‐height shelving. Public Ed.  Storage 64 8'  x 8' S12 Admin  File Storage File cabinets (locking) 108 9' x 12' S13 General Building  Storage Storage for building  supplies such as light bulbs, extra paint, ceiling tiles, etc.)
48 6'  x 8'
Fire Department Shared and Support Spaces Subtotal 3,676 Fire Department Administrative Offices and Training Classrooms Headquarters
Training Classrooms
Ambulance Deployment Center Printed - 4/25/2023 Page 3 of 6

Page 193 of 306 ends
Page 293 ends

| 142

BERKELEY FIRE DEPARTMENT MASTER PLAN
CITY OF BERKELEY
FIRE DEPARTMENT MASTER PLAN
No. Type of Space Space Attributes
No. Type of Space Space Attributes
E1 Main  Classroom Seating for 60; storage areas; counters 2,208 46'  x 48' E2 Equipment  Storage shelving for equipment 180 12' x 15' E3 Table  and Chair Storage Table and  Chair storage 192 12'  x 16' E4 Secondary Classroom seating for 24‐30 768 24'  x  32' Training Classroom Subtotal: 3,348
UTILITY SUPPORT SPACE Program Size
U1 Mechanical Room HVAC equipment; hot water heater; fire sprinkler riser.  160 8'  x 10' (2) U2 Electrical Room Main service panel, fire alarm panel; sub panels 192 12' x 16' U3 Communications  Room Telephone service racks, alert response system hub, data server hub, radio equipment; security system
192 12'  x 16'
Utility Support Subtotal 544
Headquarters Space Needs Summary Program
Fire Department Administrative Work Area Subtotal 1,735 Training Division Subtotal 1,788
Fire Department Finance Work Area Subtotal 1,147
Fire Department EMS Work Area Subtotal 842
Fire Department Emergency Management Work Area Subtotal 543 Fire Prevention Work Area Subtotal 1,458
Wildland Division Work Area Subtotal 707
Fire Department Shared and Support Spaces Subtotal 3,676 EOC and Training Classrooms 3,348
Utility Support Subtotal 544
Headquarters Subtotal: 15,788
Circulation at 30% 4,736
Headquarters Subtotal (SF): 20,524
Ambulance Deployment Center Subtotal (SF): 8,324
(See attached spreadsheet)
Sub total: 28,848 Net  SF
Grossing Factor: 15% 4,327
Grand Total HQ, Training Classrooms and Deployment Center: 33,176 EOC/Training Classroom
Fire Department Administrative Offices and Training Classrooms Headquarters
Training Classrooms
Ambulance Deployment Center Printed - 4/25/2023 Page 4 of 6

Page 194 of 306 ends
Page 294 ends

| 143

BERKELEY FIRE DEPARTMENT MASTER PLAN
CITY OF BERKELEY
FIRE DEPARTMENT MASTER PLAN
Current Future
20 80
00 10 0
No. Type  of Space Space Attributes
Program Size
Firefighter Parking 24 firefighter parking spaces, secure and separate from public parking
4,800 10'x20'  ea.

Generator Area Located at rear yard 150 10'x15'
Outdoor Patio or Deck Outdoor uses; adjacent to Kitchen 200 10'x20' No. Type  of Space Space Attributes
Ambulance Deployment Center ‐ APP BAY/APP BAY SUPPORT Program Size 1 Parking  for five
Ambulances
Five Ambulances .  Bay size for five units.

Need power to each unit.
2,400   (5) 16' x 30'
2 Medical Supply  Closet Heavy Duty Shelving;  medical supplies off of apparatus bay.
160 10'  x 16'
3 Medical Clean  Up  Clean‐up sink, shelving, Alcove in bay or near units at entry
18 3'  x 6'
4 Janitor Room Service sink, mop rack; janitorial supplies; 48 6'  x 8' 5 Medical Equipment
Storage and Charging
Heavy Duty Shelving  Equipment Charging
location
64 8'  x 8'
6 Restroom Medic/EMS toilet and sink, off of apparatus
bay
64 8'  x 8'
7 Fitness  Room Work out area with cardio and other
equipment.  Share with HQ.
576 24'  x 24'
Deployment Center ‐ App Bay/Support Subtotal 2,754
Ambulance Deployment Center
2 Paramedics, 8 EMTS, (12 and 10 hour shifts)
Located at HQ
CONCEPTUAL SPACE NEEDS OUTLINE
Deployment Center Staffing
One ALS Unit
SITE OPERATIONS
Square Footage
Four BLS Units
Ambulance ‐ Reserve
TOTAL CURRENT AND PLANNED STAFFING:

Square Footage
Headquarters
Training Classrooms

Page 195 of 306 ends
Page 295 ends

| 144

BERKELEY FIRE DEPARTMENT MASTER PLAN
CITY OF BERKELEY
FIRE DEPARTMENT MASTER PLAN
No. Type  of Space Space Attributes
Deployment Center Staging Area Program Size
8 Kitchenette Kitchen with two refrigerators, sink,
dishwasher and 2 microwaves and space for
ice machine.  Share with HQ.
192 12'  x 16'
9 Dining  Area Seating for  10 persons; wall‐mounted TV; open to kitchen; Share with HQ
168 14'  x 12'
10 Laundry Room Service sink; countertop; janitorial supplies; mop rack, Washer/Dryer, Extractor and TO
Dryer, SCBA Washer
240 12'  x 20'
11 Locker  Area 44‐36" high lockers, double stacked in open room.  18" wide x 2' deep.
360 18'  x 20'
12 Gender  Neutral
Bathroom/Shower ADA
1 accessible restroom with shower, sink,
toilet
81 9'  x 9'
13 Gender  Neutral
Bathrooms
2 restrooms with  sink, toilet 128 8' x 8'  (2)
14 Changing  Rooms 10 private changing  rooms 480 6'  x 8' (10) Deployment Center ‐ Staging Area Subtotal 1,649
Ambulance Deployment Center: Program
App Bay/Bay Support Subtotal 2,754
Staging Area Subtotal 1,649
Utility Support Subtotal 2,000
BUILDING SUBTOTAL (SF) 6,403
Circulation at 30% 1,921
Ambulance Deployment Center: GRAND TOTAL (SF) 8,324
Square Footage
Headquarters
Training Classrooms

Page 196 of 306 ends
Page 296 ends

| 145

BERKELEY FIRE DEPARTMENT MASTER PLAN
16'-0"
16'-0"
LF
11'-0"
13'-0"
LF
F

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
A1 FIRE CHIEF OFFICE (256 S.F.)
SCALE: 1/8"=1'-0"
A2 COMMUNICATIONS SPECIALIST (143 S.F.)
SCALE: 1/8"=1'-0"

OFFICE OF THE CHIEF, OPERATIONS AND SUPPORT SERVICES

Page 197 of 306 ends
Page 297 ends

| 146

BERKELEY FIRE DEPARTMENT MASTER PLAN
11'-0"
12'-0"
LF
F
12'-0"
13'-0"
LF
F

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
A3 PROJECT MANAGER (132 S.F.)
A4 CONFIDENTIAL SECRETARY (132 S.F.)
SCALE: 1/8"=1'-0"
A5 DEPUTY FIRE CHIEF OPERATIONS OFFICE (156 S.F.)
SCALE: 1/8"=1'-0"

OFFICE OF THE CHIEF, OPERATIONS AND SUPPORT SERVICES

Page 198 of 306 ends
Page 298 ends

| 147

BERKELEY FIRE DEPARTMENT MASTER PLAN
8'-0"
10'-0"
12'-0"
13'-0"
LF
F

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
A7 DEPUTY FIRE CHIEF SUPPORT SERVICES (156 S.F.)
A8 ASSISTANT FIRE CHIEF SUPPORT SERVICES (156 S.F.)
SCALE: 1/8"=1'-0"
A6 ADMINISTRATIVE ASSISTANCE - 2 (160 S.F.)
SCALE: 1/8"=1'-0"

OFFICE OF THE CHIEF, OPERATIONS AND SUPPORT SERVICES

Page 199 of 306 ends
Page 299 ends

| 148

BERKELEY FIRE DEPARTMENT MASTER PLAN
12'-0"
15'-0"

SEATING
FOR 6-8

WHITE BOARD
11'-0"
12'-0"
LF
F

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
A9 ASSISTANT MGMT. ANALYST - 2 (264 S.F.)
SCALE: 1/8"=1'-0"

OFFICE OF THE CHIEF, OPERATIONS AND SUPPORT SERVICES
A10 SMALL CONFERENCE (180 S.F.)
SCALE: 1/8"=1'-0"

Page 200 of 306 ends
Page 300 ends

| 149

BERKELEY FIRE DEPARTMENT MASTER PLAN
12'-0"
13'-0"
LF
F
8'-0"
10'-0"

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
T1 TRAINING ASSISTANT CHIEF (156 S.F.)
SCALE: 1/8"=1'-0"
T2 TRAINING ADMIN. (80 S.F.)
SCALE: 1/8"=1'-0"

TRAINING DIVISION

Page 201 of 306 ends
Page 301 ends

| 150

BERKELEY FIRE DEPARTMENT MASTER PLAN
11'-0"
12'-0"
LF
F
6'-0"
6'-0"
8'-0"
10'-0"

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
T3 TRAINING SPECIALIST (132 S.F.)
T4 TRAINING OFFICER - 2 (264 S.F.)
SCALE: 1/8"=1'-0"
T5 TRAINING SUPPORT (INTERNS AND RTO - 4) (144 S.F.)
SCALE: 1/8"=1'-0"

TRAINING DIVISION
T6 ADMINISTRATIVE ASSISTANCE - 2 (160 S.F.)
SCALE: 1/8"=1'-0"

Page 202 of 306 ends
Page 302 ends

| 151

BERKELEY FIRE DEPARTMENT MASTER PLAN
11'-0"
12'-0"
LF
F
12'-0"
15'-0"

SEATING
FOR 6-8

WHITE BOARD

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
T7 HUMAN PERFORMANCE COACHES (STRENGTH AND REHAB - 2 (336 S.F.) T8 HUMAN PERFORMANCE COACHES (NUTRITION AND BEHAVIOR - 2 (336 S.F.) SCALE: 1/8"=1'-0"

TRAINING DIVISION
SCALE: 1/8"=1'-0"
T9 SMALL CONFERENCE (180 S.F.)

Page 203 of 306 ends
Page 303 ends

| 152

BERKELEY FIRE DEPARTMENT MASTER PLAN
11'-0"
13'-0"
LF
F
11'-0"
12'-0"
LF
F

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

ADMINISTRATION AND FISCAL
F1 ADMIN. & FISCAL SERVICE MANAGER (143 S.F.)
SCALE: 1/8"=1'-0"
FP2 ASSOCIATE MGMT. ANALYST - 2 (264 S.F.)

Page 204 of 306 ends
Page 304 ends

| 153

BERKELEY FIRE DEPARTMENT MASTER PLAN
8'-0"
10'-0"
12'-0"
15'-0"

SEATING
FOR 6-8

WHITE BOARD

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023ADMINISTRATION AND FISCAL
SCALE: 1/8"=1'-0"
F3 ACCOUNTING OFFICE SPEC. III - 4 POSITIONS (320 S.F.) F4 OFFICE SPECIALIST II - 2 (160 S.F.)
F5 BUDGET ASSOCIATE MANAGEMENT ANALYST (80 S.F.)
SCALE: 1/8"=1'-0"
F6 SMALL CONFERENCE (180 S.F.)

Page 205 of 306 ends
Page 305 ends

| 154

BERKELEY FIRE DEPARTMENT MASTER PLAN
11'-0"
13'-0"
LF
F
13'-0"
12'-0"

FILES FILES

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"
EMS
EMS1 EMS ASSISTANT FIRE CHIEF (143 S.F.)
SCALE: 1/8"=1'-0"
EMS2 EMS CAPTAINS (156 S.F.)

Page 206 of 306 ends
Page 306 ends

| 155

BERKELEY FIRE DEPARTMENT MASTER PLAN
11'-0"
13'-0"
LF
F
8'-0"
10'-0"

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

EMERGENCY MANAGEMENT
EMS3 EMS QUALITY IMPROVEMENT (143 S.F.)
SCALE: 1/8"=1'-0"
EMS4 EMS OPEN WORK AREA (95 POSITIONS)
EMS ADMIN. ASSISTANT

EMS CQI
EMS RECRUITMENT/ACADEMY INTERNS - 2
(8'X10') (5) 400 S.F.

Page 207 of 306 ends
Page 307 ends

| 156

BERKELEY FIRE DEPARTMENT MASTER PLAN
11'-0"
13'-0"
LF
F
8'-0"
10'-0"

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

EMERGENCY MANAGEMENT
EM1 EMERGENCY MANAGER PROGRAM MANAGER II (143 S.F.)
SCALE: 1/8"=1'-0"
EM2 EMERGENCY SERVICES COORDINATOR OPEN WORK AREA - 3 POSITIONS (240 S.F.) EM3 EMERGENCY PLANNING SUPPORT - 2 INTERNS (160 S.F.)

Page 208 of 306 ends
Page 308 ends

| 157

BERKELEY FIRE DEPARTMENT MASTER PLAN
11'-0"
13'-0"
LF
F
11'-0"
12'-0"
LF
F

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

FIRE PREVENTION
FP1 FIRE MARSHAL (143 S.F.)
SCALE: 1/8"=1'-0"
FP2 ASSISTANT MGMT. ANALYST (132 S.F.)

Page 209 of 306 ends
Page 309 ends

| 158

BERKELEY FIRE DEPARTMENT MASTER PLAN
11'-0"
13'-0"
LF
F
10'-0"
10'-0"
8'-0"
10'-0"

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

FIRE PREVENTION
FP3 DEPUTY FIRE MARSHAL (143 S.F.)
SCALE: 1/8"=1'-0"
FP4 FIRE PREVENTION OPEN WORK AREA - TWO POSITIONS (200 S.F.) SCALE: 1/8"=1'-0"
FP5 INSPECTOR OPEN WORK AREA - FIVE POSITIONS (400 S.F.)

Page 210 of 306 ends
Page 310 ends

| 159

BERKELEY FIRE DEPARTMENT MASTER PLAN
10'-0"
10'-0"

HEAVY DUTY

FULL HEIGHT

SHELVING
8'-0"
10'-0"
12'-0"
15'-0"

SEATING
FOR 6-8

WHITE BOARD

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

FIRE PREVENTION
FP6 LIGHT DUTY WORKSTATIONS - 2 (160 S.F.)
SCALE: 1/8"=1'-0"
FP7 LIBRARY AND STORAGE
- ARCHIVES (100 S.F.)
SCALE: 1/8"=1'-0"
FP8 SMALL CONFERENCE (180 S.F.)

Page 211 of 306 ends
Page 311 ends

| 160

BERKELEY FIRE DEPARTMENT MASTER PLAN
11'-0"
13'-0"
LF
F
8'-0"
10'-0"
6'-0"
6'-0"

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
WD1 ASSISTANT CHIEF (143 S.F.)
SCALE: 1/8"=1'-0"

WILDLAND DIVISION (WUI)
WD2 OFFICE SPECIALIST (80 S.F.)
WD3 WUI CAPTAIN (80 S.F.)
WD4 VEGETATION MANAGEMENT (80 S.F.)
SCALE: 1/8"=1'-0"
WD5 INSPECTOR OPEN WORK AREA - 3 POSITIONS (108 S.F.)
WD6 FIELD COORDINATOR/INSPECTION EDUCATION/INTERNS - 6 TD (216 S.F.) SCALE: 1/8"=1'-0"

Page 212 of 306 ends
Page 312 ends

| 161

BERKELEY FIRE DEPARTMENT MASTER PLAN
14'-0"
12'-0"

ENTRANCE

TO CONFERENCE ROOM,

HISTORIC DISPLAY & RESTROOMS
12'-0"
14'-0"

ARTIFACTS

DISPLAY

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

SHARED AND SUPPORT SPACES
S1 PUBLIC ENTRY LOBBY (168 S.F.)
S2 HISTORIC DISPLAY (168 S.F.)
SCALE: 1/8"=1'-0"

Page 213 of 306 ends
Page 313 ends

| 162

BERKELEY FIRE DEPARTMENT MASTER PLAN
8'-0"
8'-0"

TO PUBLIC

ENTRY LOBBY
BABY

CHANGING

STATION
14'-0"

CENTRAL WORK

COUNTER
16'-0"
COPIER

MAILBOX
FULL HT.

SHELVING &

CABINETRY

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

SHARED AND SUPPORT SPACES
S3 PUBLIC RESTROOM - 2 (128 S.F.)
SCALE: 1/8"=1'-0"
S4 ADMIN. WORKROOM/STORAGE (224 S.F.)

Page 214 of 306 ends
Page 314 ends

| 163

BERKELEY FIRE DEPARTMENT MASTER PLAN
30'-0"
30'-0"

TO PUBLIC

ENTRY LOBBY

WHITE BOARD

STORAGE/

COUNTER
SPACE

STORAGE

STORAGE

SEATING
FOR 20-24
12'-0"
15'-0"

SEATING
FOR 6-8

WHITE BOARD

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

SHARED AND SUPPORT SPACES
S5 LARGE CONFERENCE ROOM (900 S.F.)
SCALE: 1/8"=1'-0"
S6 SMALL CONFERENCE (180 S.F.)

Page 215 of 306 ends
Page 315 ends

| 164

BERKELEY FIRE DEPARTMENT MASTER PLAN
14'-0"
16'-0"
REF.

VENDING

MACHINE
C
MW
16'-0"

GROOMING STATION/
MIRROR
16'-0"

ACCESSIBLE

RESTROOM
6 LOCKERS

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

SHARED AND SUPPORT SPACES
S7 ADMIN. BREAK ROOM (224 S.F.)
SCALE: 1/8"=1'-0"
S8 STAFF RESTROOM/LOCKER ROOM - 2 (384 S.F.)

Page 216 of 306 ends
Page 316 ends

| 165

BERKELEY FIRE DEPARTMENT MASTER PLAN
40'-0"

KETTLE BAR/

STRETCHING

TO EXTERIOR

DUMBBELL RACKS
EQPT. STORAGE
30'-0"
D.F.
6'-0"
8'-0"

SHELVING

MOP RACK

SERVICE
SINK

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

SHARED AND SUPPORT SPACES
S9 FITNESS ROOM (1,200 S.F.)
SCALE: 1/8"=1'-0"
S10 ADMIN. JANITORS ROOM (48 S.F.)

Page 217 of 306 ends
Page 317 ends

| 166

BERKELEY FIRE DEPARTMENT MASTER PLAN
8'-0"
8'-0"

HEAVY DUTY
FULL HT.

SHELVING
12'-0"
9'-0" FILE CABINETS
(LOCKING)
6'-0"
8'-0"

HEAVY DUTY
FULL HT.

SHELVING

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023SHARED AND SUPPORT SPACES
SCALE: 1/8"=1'-0"
S11 GENERAL STORAGE - SUPPLY (64 S.F.)
SCALE: 1/8"=1'-0"
S12 ADMIN. FILE STORAGE (108 S.F.)
SCALE: 1/8"=1'-0"
S13 GENERAL BUILDING STORAGE (48 S.F.)

Page 218 of 306 ends
Page 318 ends

| 167

BERKELEY FIRE DEPARTMENT MASTER PLAN
46'-0"
48'-0"

STORAGE AREA / COUNTER

STORAGE AREA / COUNTER

WHITE BOARD & PROJECTOR SCREEN

TV MONITOR TV MONITOR
SEATING FOR 60 PERSONS

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

EOC/TRAINING CLASSROOM
E1 MAIN CLASSROOM (2,208 S.F.)

Page 219 of 306 ends
Page 319 ends

| 168

BERKELEY FIRE DEPARTMENT MASTER PLAN
15'-0"
12'-0"

HEAVY DUTY

SHELVING

FOR EQUIPMENT
16'-0"
12'-0"

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

EOC/TRAINING CLASSROOM
E3 TABLE AND CHAIR STORAGE (192 S.F.)
SCALE: 1/8"=1'-0"
E2 EQUIPMENT STORAGE (180 S.F.)

Page 220 of 306 ends
Page 320 ends

| 169

BERKELEY FIRE DEPARTMENT MASTER PLAN
24'-0"
32'-0"

WHITE BOARD &

PROJECTOR SCREENTV MONITOR
SEATING FOR 24-30 PERSONS

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023

EOC/TRAINING CLASSROOM
SCALE: 1/8"=1'-0"
E4 SECONDARY CLASSROOM (768 S.F.)

Page 221 of 306 ends
Page 321 ends

| 170

BERKELEY FIRE DEPARTMENT MASTER PLAN
8'-0"
10'-0"

FIRE SPRINKLER
RISER

WATER HEATER
HVAC EQUIP.
16'-0"
MAIN SERV.

PANEL

SUB-PANELS

FIRE ALARM
PANEL
12'-0"
16'-0"
12'-0"
RADIO EQUIP.

SECURITY SYS.

TEL. SERVICE

RACKS & DATA

SERVER HUB

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023
SCALE: 1/8"=1'-0"

UTILITY SUPPORT SPACE
SCALE: 1/8"=1'-0"
SCALE: 1/8"=1'-0"
U1 MECHANICAL ROOM - 2 (160 S.F.) U2 ELECTRICAL ROOM (192 S.F.) U3 COMMUNICATIONS ROOM (192 S.F.)

Page 222 of 306 ends
Page 322 ends

| 171

BERKELEY FIRE DEPARTMENT MASTER PLAN
16'-0"
80'-0"
30'-0"
HI-SPEED ROLL-UP DOOR, TYP.

TRENCH DRAIN,
TYP.

AMBULANCE
16'-0" 16'-0"16'-0" 16'-0"

AMBULANCE

AMBULANCE

AMBULANCE

AMBULANCE

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023

1. APPARATUS BAY - 5 DRIVE-THROUGH BAYS (3,760 S.F.)
SCALE: 1/16"=1'-0"

AMBULANCE DEPLOYMENT CENTER -

APPARATUS BAY/APPARATUS BAY SUPPORT

Page 223 of 306 ends
Page 323 ends

| 172

BERKELEY FIRE DEPARTMENT MASTER PLAN
16'-0"
10'-0"

HEAVY DUTY

SHELVING

APPARATUS BAY
6'-0"
3'-0"
S.S. CLEAN-UP SINK

W/ DRAIN BOARD,

HANDS FREE

APPARATUS BAY

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023

3. CLEAN-UP (18 S.F.)
SCALE: 1/8"=1'-0"

2. MEDICAL SUPPLY (160 S.F.)
SCALE: 1/8"=1'-0"

AMBULANCE DEPLOYMENT CENTER -

APPARATUS BAY/APPARATUS BAY SUPPORT

Page 224 of 306 ends
Page 324 ends

| 173

BERKELEY FIRE DEPARTMENT MASTER PLAN
6'-0"
8'-0"

SHELVING

MOP RACK

SERVICE
SINK
8'-0"
8'-0"

HEAVY DUTY
EQPT. CHARGING

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023AMBULANCE DEPLOYMENT CENTER -

APPARATUS BAY/APPARATUS BAY SUPPORT

4. JANITOR ROOM (48 S.F.)
SCALE: 1/8"=1'-0"

5. MEDICAL EQUIPMENT STORAGE & CHARGING (64 S.F.)
SCALE: 1/8"=1'-0"

Page 225 of 306 ends
Page 325 ends

| 174

BERKELEY FIRE DEPARTMENT MASTER PLAN
8'-0"
8'-0"
24'-0"
24'-0"

TO EXTERIOR

KETTLE BAR/

STRETCHING

DUMBBELL
RACKS
HI-LOW

DRINKING

FOUNTAIN

EQUIPMENT

STORAGE RACK

EXERCISE
BIKES
BACK

EXTENSION

ELLIPTICAL

MACHINE

TREADMILL

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023AMBULANCE DEPLOYMENT CENTER -

APPARATUS BAY/APPARATUS BAY SUPPORT

6. RESTROOM (64 S.F.)
SCALE: 1/8"=1'-0"

9. FITNESS ROOM (576 S.F.)
SCALE: 1/8"=1'-0"

Page 226 of 306 ends
Page 326 ends

| 175

BERKELEY FIRE DEPARTMENT MASTER PLAN
16'-0"
12'-0"
MW
(2) REF.A REF.B
DINING
DW
ICE

MACHINE
12'-0"

SEATING
FOR 10KITCHEN
14'-0"

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023

8. KITCHENETTE (192 S.F.)
SCALE: 1/8"=1'-0"

9. DINING AREA (168 S.F.)
SCALE: 1/8"=1'-0"

DEPLOYMENT CENTER STAGING AREA

Page 227 of 306 ends
Page 327 ends

| 176

BERKELEY FIRE DEPARTMENT MASTER PLAN
W D
20'-0"
12'-0"
JAN. SUPPLIES

STORAGE

MOP SINK

MOP RACK

SERVICE
SINK

COUNTERTOP

EXTRACTOR
DRYING

CABINET
TRENCH
DRAIN
20'-0"
18'-0"
1 24
25 48
18"X24"X
36" HIGH -

DOUBLE STACK

LOCKERS

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023

10. LAUNDRY ROOM (240 S.F.)
SCALE: 1/8"=1'-0"

11. LOCKER AREA (360 S.F.)
SCALE: 1/8"=1'-0"

DEPLOYMENT CENTER STAGING AREA

Page 228 of 306 ends
Page 328 ends

| 177

BERKELEY FIRE DEPARTMENT MASTER PLAN
9'-0"
9'-0"
8'-0"
8'-0"
6'-0"
8'-0"
BENCH

CITY OF BERKELEY

HEADQUARTERS, TRAINING CLASSROOMS &

AMBULANCE DEPLOYMENT CENTER
ALS UNIT, 4 BLS UNITS & AMBULANCE-RESERVE
04/24/2023

12. GENDER NEUTRAL BATHROOM/SHOWER ADA (81 S.F.)
SCALE: 1/8"=1'-0"

DEPLOYMENT CENTER STAGING AREA

13. GENDER NEUTRAL BATHROOMS - 2 (128 S.F.)
SCALE: 1/8"=1'-0"

14. CHANGING ROOMS - 10 (480 S.F.)
SCALE: 1/8"=1'-0"

Page 229 of 306 ends
Page 329 ends

TRAINING CENTER

Page 230 of 306 ends
Page 330 ends

| 178
DRAFT
MAY 08, 2023

BERKELEY FIRE DEPARTMENT MASTER PLAN

PROJECT DESCRIPTION
The existing training center is colocated with Fire House No. 6 and was built in 1990. Because of its location in a residential neighborhood there are many limitations to the trainings which can be held there and the time in which the tr
ainings can take place. It is also undersized for he current needs of the Berkeley Fire Department.

The region (inclusive of the cities of Berkeley, Albany, El Cerrito, Kensington, Richmond, Contra Costa County, and UC Berkeley) is devoid of adequate training space for emergency responders. The closest adequately sized facilities are in Concord and Hayward – far too great a distance to send on-duty staff to train.

The recomendation is to partner with other local municpalities to build a large technical rescue training and education center for this region’s first responders.

The ROM Project Budget for the Recommended Option is $81-90 not including escalation beyond 2024. Note that this cost would be shared with the other participating municipalities.

CITY OF BERKELEY

TRAINING CENTER
999 CEDAR STREET, BERKELEY , CA 94703
CEDAR ST.

NINTH ST.

EIGHTH ST.

Page 231 of 306 ends
Page 331 ends

ALL DRAWINGS ARE PROTECTED BY FEDERAL COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODU CED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION.

DOCUMENTS MAY NOT BE USED IN PART OR WHOLE TO DEVELOP THE DESIGN OF ANOTHER BUILDING WITHOUT EXPRESS WRITTEN PERMISSION BY MANNS WOODWARD STUDIOS. 410-344-1460 | WWW.MWSARCH.COM

S T U D I O S
ARCHITECTURE + MASTER PLANNING

BERKELEY TRAINING FACILITY

CUTTING BOULEVARD SITE

SOUTHEAST VIEW
08/05/22 | X002

BERKELEY TRAINING FACILITY

CUTTING BOULEVARD SITE

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 179

Page 232 of 306 ends
Page 332 ends

ALL DRAWINGS ARE PROTECTED BY FEDERAL COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODU CED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION.

DOCUMENTS MAY NOT BE USED IN PART OR WHOLE TO DEVELOP THE DESIGN OF ANOTHER BUILDING WITHOUT EXPRESS WRITTEN PERMISSION BY MANNS WOODWARD STUDIOS. 410-344-1460 | WWW.MWSARCH.COM

S T U D I O S
ARCHITECTURE + MASTER PLANNING

BERKELEY TRAINING FACILITY

CUTTING BOULEVARD SITE

OVERALL PLAN
08/05/2022 | X001

BERKELEY TRAINING FACILITY

CUTTING BOULEVARD SITE

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 180

Page 233 of 306 ends
Page 333 ends

Berkeley Regional Training Facility - Brookside Drive
Draft Program
6/13/2022

FUNCTION COMMENTS QTY NOMINAL LENGTH

NOMINAL

WIDTH UNIT NET SF TOTAL NET SF GROSS FACTOR
TOTAL

GROSS SF
A INSTRUCTION BUILDING - PHASE 1

10.1 TURNOUT GEAR - TRAINEE 40 Turnout Gear Lockers 1 19.3 FT x 28.8 FT 555 NSF EACH 555 NSF 35% 749 GSF

10.2 TURNOUT GEAR - INSTRUCTOR 10 Turnout Gear Lockers 1 15.3 FT x 10.0 FT 153 NSF EACH 153 NSF 35% 207 GSF

11.0 DECON 1 29.3 FT x 19.0 FT 557 NSF EACH 557 NSF 35% 752 GSF

11.1 DECON TOILET Locate near Turnout Gear and Dirty Classroom 2 11.0 FT x 9.0 FT 99 NSF EACH 198 NSF 35% 267 GSF

12.0 DIRTY CLASSROOM Fit (1) apparatus 1 28.0 FT x 65.0 FT 1,820 NSF EACH 1,820 NSF 15% 2,093 GSF

13.0 UTILITY/MECHANICAL 1 14.0 FT x 10.0 FT 140 NSF EACH 140 NSF 35% 189 GSF

14.0 UTILITY/ELECTRICAL 1 14.0 FT x 10.0 FT 140 NSF EACH 140 NSF 35% 189 GSF

15.0 IT/SERVER 1 14.0 FT x 10.0 FT 140 NSF EACH 140 NSF 35% 189 GSF

16.0 WORKSHOP 1 15.0 FT x 15.0 FT 225 NSF EACH 225 NSF 35% 304 GSF

17.0 SCBA 1 12.0 FT x 11.0 FT 132 NSF EACH 132 NSF 35% 178 GSF

17.1 COMPRESSOR ROOM 1 8.0 FT x 6.0 FT 48 NSF EACH 48 NSF 35% 65 GSF SUB TOTALS 4,108 NSF 35% AVG 5,181 GSF
B CLASSROOM BUILDING - PHASE 2

1.0 SECURE VESTIBULE/LOBBY 1 20.0 FT x 15.0 FT 300 NSF EACH 300 NSF 35% 405 GSF

2.0 TOILET ROOM

3.0 CLASSROOM 60/30 Students, Dividable into 2 smaller rooms 2 54.5 FT x 38.3 FT 2,085 NSF EACH 4,169 NSF 35% 5,628 GSF

3.1 BREAKOUT ROOM 4 16.0 FT x 12.0 FT 192 NSF EACH 768 NSF 35% 1,037 GSF

4.0 OFFICE SPACES 25

4.1 SMALL OFFICE 1 occupant 10 10.0 FT x 8.5 FT 85 NSF EACH 850 NSF 35% 1,148 GSF

4.2 MANAGER OFFICE 1 occupant 10.5 FT x 11.5 FT 121 NSF EACH NSF 35% GSF

4.3 GROUP OFFICE 4 occupants 4 13.0 FT x 16.0 FT 208 NSF EACH 832 NSF 35% 1,123 GSF

4.4 OPEN OFFICE 16 occupants 26.0 FT x 22.5 FT 585 NSF EACH NSF 35% GSF

5.0 CAFETERIA/DINING 40 People 1 41.8 FT x 26.0 FT 1,086 NSF EACH 1,086 NSF 35% 1,465 GSF

6.0 FITNESS 40 People 1 47.5 FT x 25.0 FT 1,188 NSF EACH 1,188 NSF 35% 1,603 GSF

7.0 VR SIMULATOR ROOM was 'Command Simulation' 1 30.0 FT x 12.0 FT 360 NSF EACH 360 NSF 35% 486 GSF

8.0 DRIVING SIMULATOR ROOM was 'VR Room' 1 20.0 FT x 16.0 FT 320 NSF EACH 320 NSF 35% 432 GSF

9.0 LOCKER & T/S ROOM 40 Lockers, 6 T/S 1 27.3 FT x 51.0 FT 1,392 NSF EACH 1,392 NSF 35% 1,880 GSF SUB TOTALS 9,872 NSF 35% AVG 13,328 GSF

C APPARATUS STORAGE

1.0 VEHICLE STORAGE 1 108.5 FT x 73.5 FT 7,975 NSF EACH 7,975 NSF 0% 7,975 GSF

1.1 ENGINE 1 NSF EACH NSF 35% GSF

1.2 MEDIC 2 NSF EACH NSF 35% GSF

1.3 SPRINTER VAN 5 NSF EACH NSF 35% GSF
1 BERKELEY FIRE DEPARTMENT MASTER PLAN
| 181

Page 234 of 306 ends
Page 334 ends

Berkeley Regional Training Facility - Brookside Drive
Draft Program
6/13/2022

1.4 STAFF TRUCK 1 NSF EACH NSF 35% GSF

1.5 RESCUE TRAILER 30' Tow 1 NSF EACH NSF 35% GSF

1.6 TILLER 1 NSF EACH NSF 35% GSF

1.7 FORKLIFT 2 NSF EACH NSF 35% GSF

1.8 GATOR 1 NSF EACH NSF 35% GSF
SUB TOTALS 7,975 NSF 35% AVG 7,975 GSF

D SITE TRAINING

1.0 BART STATION 1 30.0 FT x 80.0 FT 2,400 NSF EACH 2,400 NSF 0% 2,400 GSF

2.0 FLASHOVER SIM TRAILER 1 NSF EACH NSF 0% GSF

3.0 VEHICLE RESCUE/EXTRACTION 1 100.0 FT x 75.0 FT 7,500 NSF EACH 7,500 NSF 0% 7,500 GSF

4.0 CONFINED SPACE 1 50.0 FT x 50.0 FT 2,500 NSF EACH 2,500 NSF 0% 2,500 GSF

5.0 VENTILATION SIMULATOR 1 NSF EACH NSF 0% GSF

6.0 RESIDENTIAL SEARCH AND RESCUE 1 50.0 FT x 50.0 FT 2,500 NSF EACH 2,500 NSF 0% 2,500 GSF

6.1 BASEMENT SIMULATOR 0%

7.0 BREACHING PROP 1 NSF EACH NSF 0% GSF

8.0 SPRINKER LAB 1 NSF EACH NSF 0% GSF

9.0 STANDPIPE/HIGH RISE 1 NSF EACH NSF 0% GSF

10.0 ELEVATOR PROP 1 197 NSF EACH 197 NSF 0% 266 GSF

12.0 TRENCH RESCUE 1 100.0 FT x 75.0 FT 7,500 NSF EACH 7,500 NSF 0% 7,500 GSF

13.0 HIGH ANGLE RESCUE 1 50.0 FT x 50.0 FT 2,500 NSF EACH 2,500 NSF 0% 2,500 GSF

14.0 DRAFTING PIT 1 NSF EACH NSF 0% GSF
SUBTOTALS 25,097 NSF % AVG 25,166 GSF
STARTI
STARTI
2 BERKELEY FIRE DEPARTMENT MASTER PLAN
| 182

Page 235 of 306 ends
Page 335 ends

77997788 SSFF

VVEEHHIICCLLEE

SSTTOORRAAGGEE
108' - 5"

AISLE CLEARANCE
14 x 14 14 x 1414 x 14

SIDE WALL CLEARANCE

SIDE WALL CLEARANCE
73' - 7"
5' - 0"
5' - 0"
12 x 14 12 x 1412 x 14
5' - 0"
DWG NUMBER:

ALL DRAWINGS ARE COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODUCED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION DWG ISSUED ON:

DWG SCALE:
(P) 410-344-1460
(F) 443-403-2460
(E) [email protected]
WWW.MWSARCH.COM

STUDIOS
ARCHITECTURE + MASTER PLANNING
10839-D PHILADELPHIA RD
WHITE MARSH, MD 21162
6/2/2022 5:26:50 PM
3/32" = 1'-0"
PR-1BERKELEY TRAINING FACILITY
VVEEHHIICCLLEE SSTTOORRAAGGEE 06/02/2022
JOB NO:21-000

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 183

Page 236 of 306 ends
Page 336 ends

886600 SSFF

CCLLAASSSSRROOOOMM
AA
886600 SSFF

CCLLAASSSSRROOOOMM
BB
8877 SSFF

SSTTOORRAAGGEE
8877 SSFF

SSTTOORRAAGGEE
3' - 4"
9' - 2"
6' - 4" 5' - 5"
5' - 0"

EXIT EXIT

EXIT EXIT
16' - 10"
119922 SSFF

BBRREEAAKKOOUUTT

RROOOOMM
119922 SSFF

BBRREEAAKKOOUUTT

RROOOOMM
12' - 5" 54' - 7" 12' - 5"

NICHE FOR MOVEABLE

PARTITION

LECTURNPROJECTOR SCREEN
32' - 10"
27' - 3 1/2" 27' - 3 1/2"
32 SEATS 32 SEATS
DWG NUMBER:

ALL DRAWINGS ARE COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODUCED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION DWG ISSUED ON:

DWG SCALE:
(P) 410-344-1460
(F) 443-403-2460
(E) [email protected]
WWW.MWSARCH.COM

STUDIOS
ARCHITECTURE + MASTER PLANNING
10839-D PHILADELPHIA RD
WHITE MARSH, MD 21162
6/2/2022 5:26:53 PM
1/8" = 1'-0"
PR-3.0BERKELEY TRAINING FACILITY
CCLLAASSSSRROOOOMM 06/02/2022
JOB NO:21-000

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 184

Page 237 of 306 ends
Page 337 ends

11882200 SSFF

DDIIRRTTYY

CCLLAASSSSRROOOOMM
65' - 0"
28' - 0
"
14 x 14
20' - 0"
10' - 0
"
8' - 0
"
10' - 0
"

TO DECON/

TURNOUT GEAR TO LOCKERS

TO EXTERIOR
10' - 0"
DWG NUMBER:

ALL DRAWINGS ARE COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODUCED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION DWG ISSUED ON:

DWG SCALE:
(P) 410-344-1460
(F) 443-403-2460
(E) [email protected]
WWW.MWSARCH.COM

STUDIOS
ARCHITECTURE + MASTER PLANNING
10839-D PHILADELPHIA RD
WHITE MARSH, MD 21162
6/2/2022 5:26:54 PM
1/8" = 1'-0"
PR-12.0BERKELEY TRAINING FACILITY
DDIIRRTTYY CCLLAASSSSRROOOOMM 06/02/2022
JOB NO:21-000

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 185

Page 238 of 306 ends
Page 338 ends

10' - 0"
8855 SSFF

SSMMAALLLL

OOFFFFIICCEE
8' - 6"
10' - 8"
112211 SSFF

SSMMAALLLL

MMAANNAAGGEERR

OOFFFFIICCEE
11' - 4"
16' - 0"
13' - 0"
220088 SSFF

GGRROOUUPP

UPPER CABINETS
30" DEEP WORK SURFACE

UPPER CABINETS
557744 SSFF

SSHHAARREEDD//OOPPEENN

OOFFFFIICCEE
26' - 0"
2' - 6" 6' - 0" 2' - 6"
22' - 5"
30" WORKSURFACE
5'x5' WORKSPACE
DWG NUMBER:

ALL DRAWINGS ARE COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODUCED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION DWG ISSUED ON:

DWG SCALE:
(P) 410-344-1460
(F) 443-403-2460
(E) [email protected]
WWW.MWSARCH.COM

STUDIOS
ARCHITECTURE + MASTER PLANNING
10839-D PHILADELPHIA RD
WHITE MARSH, MD 21162
6/2/2022 5:27:33 PM
1/8" = 1'-0"
PR-4.0

BERKELEY TRAINING FACILITY

OOFFFFIICCEESS
06/02/2022
JOB NO:21-000
PR-4.1 Office
PR-4.2 Manager Office
PR-4.3 Group Office
PR-4.4 Open Office

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 186

Page 239 of 306 ends
Page 339 ends

11000077 SSFF

CCAAFFEETTEERRIIAA

MICROWAVE

REFRIGERATOR/FREEZER

DISHWASHER

WALL MOUNTED TV

DINING TABLES
(10 SEATS EACH)

WALL CABINETS
41' - 9"
26' - 0"

TO EXTERIOR

COUNTERTOP W/

BASE CABINETS

TO CORRIDOR
DWG NUMBER:

ALL DRAWINGS ARE COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODUCED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION DWG ISSUED ON:

DWG SCALE:
(P) 410-344-1460
(F) 443-403-2460
(E) [email protected]
WWW.MWSARCH.COM

STUDIOS
ARCHITECTURE + MASTER PLANNING
10839-D PHILADELPHIA RD
WHITE MARSH, MD 21162
6/2/2022 5:27:33 PM
1/8" = 1'-0"
PR-5.0

BERKELEY TRAINING FACILITY

CCAAFFEETTEERRIIAA
06/02/2022
JOB NO:21-000

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 187

Page 240 of 306 ends
Page 340 ends

25' - 10"
11118888 SSFF

FFIITTNNEESSSS
SOUND
INSULATION, TYP.
8' X 8' COILING
DOOR

DUMBBELL
RACKS
4' X 8' NON-SHATTERING
MIRROR

EXERCISE
BIKE

ELLIPTICAL

MACHINES

TREADMILL
TO

PATIO JACOB'S LADDER SQUAT RACK
WATER

COOLERWEIGHT BENCH
48' - 4"

TO CORRIDOR
DWG NUMBER:

ALL DRAWINGS ARE COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODUCED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION DWG ISSUED ON:

DWG SCALE:
(P) 410-344-1460
(F) 443-403-2460
(E) [email protected]
WWW.MWSARCH.COM

STUDIOS
ARCHITECTURE + MASTER PLANNING
10839-D PHILADELPHIA RD
WHITE MARSH, MD 21162
6/2/2022 5:27:35 PM
1/8" = 1'-0"
PR-6.0

BERKELEY TRAINING FACILITY

FFIITTNNEESSSS
06/02/2022
JOB NO:21-000

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 188

Page 241 of 306 ends
Page 341 ends

660000 SSFF
VVRR

SSIIMMUULLAATTOORR

RROOOOMM
30' - 0"
20' - 0"
16' - 0"

DRIVING SIMULATION

STATION

SERVER RACK

PROJECTION SCREEN

VR MOBILITY SPACE
15' - 0"
15' - 0"

VR COMPUTER

WORKSTATION
332200 SSFF

DDRRIIVVIINNGG

SSIIMMUULLAATTOORR

RROOOOMM
20' - 0"
DWG NUMBER:

ALL DRAWINGS ARE COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODUCED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION DWG ISSUED ON:

DWG SCALE:
(P) 410-344-1460
(F) 443-403-2460
(E) [email protected]
WWW.MWSARCH.COM

STUDIOS
ARCHITECTURE + MASTER PLANNING
10839-D PHILADELPHIA RD
WHITE MARSH, MD 21162
6/2/2022 5:27:35 PM
1/8" = 1'-0"
PR-7.0

BERKELEY TRAINING FACILITY

VVRR RROOOOMMSS
06/02/2022
JOB NO:21-000

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 189

Page 242 of 306 ends
Page 342 ends

3' - 3" 6' - 5"
8' - 0"
6' - 6" 8' - 0"
18' - 11"
51' - 0"
27' - 4"
(40) 24"x24"

LOCKERS

ADA BENCH

ADA TOILET

ADA TOILET
994488 SSFF

LLOOCCKKEERR

RROOOOMM
6622 SSFF
TT&&SS
6644 SSFF
TT&&SS
6644 SSFF
TT&&SS
6611 SSFF
TT&&SS
6611 SSFF
TT&&SS
6644 SSFF
TT&&SS
DWG NUMBER:

ALL DRAWINGS ARE COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODUCED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION DWG ISSUED ON:

DWG SCALE:
(P) 410-344-1460
(F) 443-403-2460
(E) [email protected]
WWW.MWSARCH.COM

STUDIOS
ARCHITECTURE + MASTER PLANNING
10839-D PHILADELPHIA RD
WHITE MARSH, MD 21162
6/2/2022 5:27:36 PM
1/8" = 1'-0"
PR-9.0

BERKELEY TRAINING FACILITY

LLOOCCKKEERRSS
06/02/2022
JOB NO:21-000

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 190

Page 243 of 306 ends
Page 343 ends

449999 SSFF

TTUURRNNOOUUTT

GGEEAARR
19' - 4"
5' - 0" 5' - 0" FLOOR DRAIN
(41) 24" x 24"

LOCKERS
28' - 8"
114422 SSFF

TTUURRNNOOUUTT

GGEEAARR
6' - 0"

FLOOR DRAIN
(10) 24" x 24"

LOCKERS
BENCH
15' - 4"
10' - 0"
DWG NUMBER:

ALL DRAWINGS ARE COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODUCED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION DWG ISSUED ON:

DWG SCALE:
(P) 410-344-1460
(F) 443-403-2460
(E) [email protected]
WWW.MWSARCH.COM

STUDIOS
ARCHITECTURE + MASTER PLANNING
10839-D PHILADELPHIA RD
WHITE MARSH, MD 21162
6/2/2022 5:27:37 PM
1/8" = 1'-0"
PR-10.0

BERKELEY TRAINING FACILITY

TTUURRNNOOUUTT GGEEAARR
06/02/2022
JOB NO:21-000
PR-10.1 Turnout Gear - Trainee
PR-10.2 Turnout Gear - Instructor

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 191

Page 244 of 306 ends
Page 344 ends

TO TURNOUT GEAR
4' - 0" 11' - 4" 11' - 0" 3' - 0"
3' - 4"8' - 0"7' - 8"
443377 SSFF

DDEECCOONN
29' - 4"
19' - 0"

DECON SHOWER W/

TRENCH DRAIN

HAND SINK

WASHER AND
DRYER

SHELVING ABOVE

GEAR DRYER
3 COMP SINK

GEAR EXTRACTOR

TRENCH DRAIN

RAISED PLATFORM

TO EXTERIOR
DWG NUMBER:

ALL DRAWINGS ARE COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODUCED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION DWG ISSUED ON:

DWG SCALE:
(P) 410-344-1460
(F) 443-403-2460
(E) [email protected]
WWW.MWSARCH.COM

STUDIOS
ARCHITECTURE + MASTER PLANNING
10839-D PHILADELPHIA RD
WHITE MARSH, MD 21162
6/2/2022 5:27:37 PM
1/8" = 1'-0"
PR-11.0

BERKELEY TRAINING FACILITY

DDEECCOONN
06/02/2022
JOB NO:21-000

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 192

Page 245 of 306 ends
Page 345 ends

220011 SSFF

WWOORRKKSSHHOOPP
15' - 0"
15' - 0"
8'x8' COILING
DOOR

TO EXTERIOR TO DIRTY

CLASSROOM
30" DEEP

WORKBENCH
8' - 0"
8' - 0"

CLEAR WORK SPACE
DWG NUMBER:

ALL DRAWINGS ARE COPYRIGHT BY MANNS WOODWARD STUDIOS, INC. AND CAN NOT BE REPRODUCED OR MODIFIED IN ANY MANNER WITHOUT WRITTEN PERMISSION DWG ISSUED ON:

DWG SCALE:
(P) 410-344-1460
(F) 443-403-2460
(E) [email protected]
WWW.MWSARCH.COM

STUDIOS
ARCHITECTURE + MASTER PLANNING
10839-D PHILADELPHIA RD
WHITE MARSH, MD 21162
6/7/2022 12:57:47 PM
1/8" = 1'-0"
PR-16.0

BERKELEY TRAINING FACILITY

WWOORRKKSSHHOOPP
06/07/22
JOB NO:21-000

BERKELEY FIRE DEPARTMENT MASTER PLAN
| 193

Page 246 of 306 ends
Page 346 ends

610 16TH STREET, SUITE 210, OAKLAND, CA 94612
510.208.9400
www.marymcgratharchitects.com
6201 DOYLE STREET, SUITE B, EMERYVILLE, CA 94608
510.547.8092
www.seigelstrain.com

Page 247 of 306 ends
Page 347 ends

STRATEGIC ECONOMICS | 2991 SHATTUCK AVE. SUITE 203 BERKELEY, CA. 94705 | 510.647.5291

MEMORANDUM
To: Susi Marzuola and Madison Jackson, Siegel & Strain Architects From: Dena Belzer and Tatum Troutt
Date: November 10, 2022
Project: Berkeley Fire Department Master Plan
Subject: Mixed-Use Fire Station Case Studies
The City of Berkeley Fire Department is in the process of developing an Essential Facilities Master Plan to address the replacement and/or upgrading of current Fire Department facilities. As part of this process, the potential to use “public private partne rships” involving fire stations incorporated into larger mixed-use development is being explored as an option for funding some or all of the cost to provide new or upgraded fire station facilities. Strategic Economics was hired to conduct case studies profiling mixed-use fire stations to determine how transferable these examples could be to the Berkeley context and therefore whether the public/private approach should be considered as a potential funding option.

Mixed-use fire stations are very unusual, thus limiting the potential pool of case studies to draw upon.

However, there is growing interest in pursuing this type of development project, particularly in land - constrained and highly urbanized areas. The c ase studies presented below were identified by the consultant team based on professional knowledge and potential fit w ith Berkeley Fire Department’s interest in the potential to use new development to help fund fire stations. Information for each case study was collected from official planning documents, local news outlets, CoStar real estate data service, and discussions with key stakeholders. The case studies summarize each project’s development history, funding sources general takeaways, and potential applicability to the Berkeley Fire Department. This memorandum presents the following case studies:
1) Fire Station 13, San Francisco, California
2) The Station at Potomac Yard, Alexandria, Virginia
3) Lincoln Towers in Wilmington, Delaware
Each case study provided valuable context for the prospect of building mixed -use fire stations in Berkeley. The case studies represent diver se market conditions, site needs, funding streams, and challenges, all of which impacted the ability to build these projects. The details of each case study and their applicability to Berkeley are detailed in the body of the memo, but the following points summarize the key takeaways based on the overall differences and similarities among the case studies:

BERKELEY FIRE DEPARTMENT MASTER PLAN | 1
APPENDIX A.

Page 248 of 306 ends
Page 348 ends

Berkeley Fire Department Mixed-Use Fire Station Case Studies November 10, 2022
1) Developer contributions to funding mixed-use fire stations are only possible when the private development generates enough value to pay for the extra construction costs without impacting expected rates of return for the overall project. Both Fire Station 13 in San Francisco and The Station at Potomac Yards involved very large-scale development programs. 2) California’s seismic building codes are extremely stringent for public safety buildings. As a result, if a fire station were to be integrated into a mixed-use building, the entire building would need to meet these high seismic safety standards, making construction costs prohibitive.

Other states do not have these same seismic safety issues; therefore, it is not as challenging to integrate a fire station into a mixed-use building.
3) Berkeley could use its community benefits program to help pay for fire stations, but this would create some challenges. First, developers only provide a community benefits package when they are requesting a rezoning or General Plan amendment that would create a significant uplift in the overall value of their project. Not all development projects contribute community benefits, so this would be a limited opportunity to generate additional revenue for fire stations.

Second, community benefits packages in Berkeley typically include offering more affordable housing units or deeper affordability. If developers were asked to con tribute towards fire stations instead, the City would have fewer opportunities to produce affordable housing. 4) Each of these projects benefitted from having other funding sources already in place to offset some costs. In San Francisco, there was already mo ney for the interim operations of a fire station, and in Alexandria and Lincoln, there were various sources of government funding and financing to help pay for components of the construction costs. 5) Given the costs associated with the seismic safety requirements for fire stations in California, pairing affordable housing with a fire station is not cost-effective. The projects in Alexandria and Lincoln incorporated affordable housing which inherently requires the use of many different funding and financing sources. This is also possible in Berkeley, but the extraordinary costs make combining a fire station and an affordable housing project cost prohibitive.

Additionally, tax credits which are used for low-income housing would likely not be awarded to such a high-cost project.1
Fire Station 13: San Francisco, CA
Fire Station 13 is located at 530 Sansome Street in San Francisco’s Financial District near Chinatown and the Jackson Square Historic District . Built in 1975, this active fir e station serves the Financial District and is one of the busiest fire stations in the City. In the early 2000s, Supervisor Aaron Peskin suggested exploring the potential to redevelop this site with housing, but the idea was not pursued further at the time. After reelection more than a decade later, Supervisor Peskin again introduced the idea in 2017. The proposal was to utilize city controlled buildable air rights to fund improvements to an outdated fire station including improved ventilation and a better layout to improve efficiency for the firefighters.

By 2017, the housing crisis in San Francisco was much more acute than in 2002, so this concept was presented as a potential source for funding affordable housing, as well as for achieving other community benefits including preserving a specific legacy business nearby and modernizing the fire station itself. The potential to capture these community benefits and to enhance to public safety by

1 California Tax Credit Allocation Committee Regulations Implementing the Federal and State Low Income Housing Tax Credit Laws: Section 10317. State Tax Credit Eligibility Requirements.

BERKELEY FIRE DEPARTMENT MASTER PLAN | 2
APPENDIX A.

Page 249 of 306 ends
Page 349 ends

Berkeley Fire Department Mixed-Use Fire Station Case Studies November 10, 2022
building a more efficient and effective fire station were recognized as important enough by the community and other stakeholders to enable the concept to gain more traction than it had the first time it was proposed. The combination of the needs of the City and the strong market conditions in San Francisco’s Financial District at the time created an ideal opportunity to push this idea forward.

A resolution was introduced by Supervisor Peskin requesting that the City’s Real Estate Division issue a request for proposals for the site, and the Board of Supervisors unanimously passed the resolution.

In January of 2019, Mayor London Breed and Supe rvisor Peskin announced the development opportunity.2 The City’s Public Works and Fire departments created specifications for the fire station design to inform developer proposals, and multiple proposals were received and subsequently reviewed by the Fire Commission. Later in 2019, the City chose Related California to redevelop the parcel.

Related California submitted two scenarios for developing the site: one was primarily residential, and the other was primarily commercial. The residential scenario woul d yield about 250 apartments or condos on top of the fire station, going up 21 stories. The commercial scenario included the fire station, a 200 -room hotel, 40,500 square feet of office, 8,000 square feet of restaurants, and a 35,000 square foot fitness center, with the building going up only 19 stories but due to different floor heights, this scenario would be about the same height as the residential scenario. Both scenarios include a fully renovated, seismically enhanced 4 -story fire station. 3 The City h as approved both scenarios, but as of 2022, the commercial scenario is moving forward.

The property is in the Downtown Office Zoning District, the highest intensity zoning area in San Francisco, and is where the City’s most identifiable buildings are located. Related California has hired the architecture firm Skidmore, Owings, and Merrill which has designed other iconic buildings in San Francisco, to provide continuity between the new development and the general architectural character of this specific district. The area immediately around is already built out at densities that are consistent with either of Related California's proposed scenarios, and other strong development activity nearby, including proposals for higher intensity hotel, office, and housi ng, suggests that there is sufficient market support for this particular project.

The request for proposals issued by the City only included the fire station parcel, but Related California also acquired two adjacent parcels to provide greater design flexibility in the way that the fire station would be integrated with the private uses. This assemblage resulted in a parcel approximately 0.41 acres in size. Initially, the plan had been to build the private uses directly on top of the fire station, however in the final design , the private use s are in a separated component of the building that is suspended above the fire station with a physical gap in -between. This gap enables the fire station to meet extremely high seismic standards required of this use without having to apply these same standards to the remaining components of the building above. Had the private development been built directly on top of the fire station, the private uses would have been subject to the same seismic standards as the fire station. The cost to meet these additional and unnecessary seismic standards would have rendered the entire project infeasible.

Another critical component of this project is that regardless of which development scenario were to get built, either one would be subject to an affordable housing in-lieu fee typically only associated with a residential project. These fee revenues will contribute to funding more than 50 affordable units in nearby Chinatown. Additionally, a portion of the fees from this project wi ll be used to preserve New

2 Mayor London Breed Announces Plan To Redevelop Fire Station 13 With Housing, 2019. 3 Project Authorization, 2021.

BERKELEY FIRE DEPARTMENT MASTER PLAN | 3
APPENDIX A.

Page 250 of 306 ends
Page 350 ends

Berkeley Fire Department Mixed-Use Fire Station Case Studies November 10, 2022
Asia Restaurant, a legacy business on the site of the affordable housing project planned for Chinatown and which is a culturally significant business for the Chinatown community.

This project will result in providing a new modern fire station that is entirely privately financed. The fire station is projected to cost $35 million, accounting for 19 percent of the total estimated project cost of over $184 million, which includes the cost of acquiring the adjacent parcels.4 However, it should be noted that these costs may increase due to the impacts of COVID -19 supply chain issues on construction costs, but the developer is still planning to move forward. The benefit to the City comes from utilizing the very valuable air rights above the fire station, while maintaining City ownership of the fire station itself. By capturing this value , the City is allowing for underutilized space to fund needed renovations of the station, provide affordable housing fees, preserve a legacy business, and enable a suitable development appropriate to the immediate neighborhood context. The developer benefits from gaining development rights in this highly valuable market location . The significant community benefits have resulted in very little community opposition which has also enhanced the viability of this development.

The case in San Francisco is particularly relevant for Berkeley because both are subject to California’s stringent seismic safety codes , but it is important to also recognize that the market conditions influencing the return for the developer are very different when comparing Fire Station 13’s location and overall market context with the places in Berkeley where fire stations are located . The key considerations raised by this case study that are potentially relevant to the Berkeley Fire Department Master Plan include the following points:

1. Location and real estate market conditions are critical to the success of a public/private partnership like the one between San Francisco and Related California. The value created from the site’s upzoning was significant enough for the Developer to agree to completely fund the fire station’s redevelopment and to pay the housing in-lieu fees despite intending to build a commercial project not subject to such fees. This project was possible because the site’s use as a single-story fire station underutilized a very valuable location in one of the densest parts of a major global city with a very high-density development pattern and very high real estate values.

2. City input on the design of the project, particularly from fire department stakeholders, is crucial to frontload on the project. Stakeholders interviewed for this case study indicated that fire department stakeholders had extensive feedback on initial preliminary designs for this project related to access, frontage, seismic standards, and efficiency needs specific to emergency services. If the developer had waited to verify the needs of the fire department until later in their own design process, there could have been many wasted costs on engineering and architectural fees due to redesigns that would have been necessary. By ensuring that the needs of the fire department are prioritized at the beginning design stages, all stakeholders involved can save time and money from avoiding oversights and extensive redesigns.

3. When redeveloping an existing fire station with a mixed-use project that will include a new fire station, it is critical to create a plan to prevent disruption of services. Not planning this in advance can disrupt service and potentially be very costly. The San Francisco project was able to address this challenge because the Fire Department already had funding and plans in place for maintaining fire operations when a fire station is being rebuilt due to other stations throughout the city also undergoing renovations and seismic improvements. The

4 San Francisco Business Times, 2021.

BERKELEY FIRE DEPARTMENT MASTER PLAN | 4
APPENDIX A.

Page 251 of 306 ends
Page 351 ends

Berkeley Fire Department Mixed-Use Fire Station Case Studies November 10, 2022
funding and plans for continuous operations are expected to still be available when construction commences for the new Fire Station 13.

The Station at Potomac Yard: Alexandria, VA
Potomac Yard includes approximately 295 acres and is located in northeastern Alexandria, Virginia just south of downtown Washington D.C. The Station at Potomac Yard, the City’s mixed-use fire station and housing development located at 650 Maskell Street, was one of the first developments in Potomac Yard. The overall Potomac Yard site had been a rail yard that began operating in 1857. Rail operations ceased in 1987, and the property owner at the time worked with the City to begin envisioning different uses for this site as part of the citywide comprehensive planning process, which ultimately was not adopted, and at the same time, the community began pushing for a mixed-use neighborhood.

In 1992, the Potomac Yard Small Area Plan was approved by the Alexandria city council, establishing the vision guiding residential and commercial d evelopment in the area. The 1992 Area Plan allowed for approximately 12 million square feet of development with a combination of office, retail, hotel, and residential uses divided into sub-districts or “land bays” with each land bay including its own land use mix. The property owner proposed two initial ideas for this site including a football stadium and the United States Patent and Trade Office, but neither of these proposals passed the planning commission. Ongoing discussions with stakeholders and the c ommunity regarding allowable development prompted an update to the area plan by the late 1990s which ultimately lowered the overall allowable development capacity to approximately 8 million square feet.

Following the two failed proposals submitted by the property owner, in 2004 two major developers joined forces to purchase the land and create the Potomac Yard Development LLC. The master developer and the Potomac Yard Planning Commission were beginning work to realize development plans by 2005. 5 At the ti me of initial plan adoption, there was very little d evelopment in the areas immediately surrounding Potomac Yard except for a few small apartment complexes and a bit of freestanding retail, but the planning process, which had lasted nearly a decade, garner ed strong community and market interest. The zoning for the Potomac Yard site was designated as a Coordinated Development District which was unique compared to the nearby areas which were primarily zoned for various levels of residential intensity with much of the city being zoned as low-density residential.

By 2006, the master plan had evolved to include enough development potential to warrant the need for additional on-site emergency services. In particular, there was a need identified for a fire station to serve the new population with acceptable response times. The developers agreed to provide an approximately one-acre parcel of land adjacent to the neighborhood and $6 .6 million in financial support for the construction of a new fire station that could support the required emergency service activities. This decision was beneficial to the developer because, otherwise, they would have needed to reconfigure the master plan design to accommodate the emergency services within the area, instead of directly ad jacent to it, resulting in a reduction in developable area or they would have needed to reduce development overall in order to meet demand with existing emergency services. This also allowed for the developer to proceed with their planned timeline and proj ect phasing. The fire station was planned to be 21,953 square feet including four bays, offices, day spaces, operational

5 For more information on the development history of Potomac Yard, see History of Land Use and Planning in Potomac Yard, North Potomac Yard Small Area Plan Appendix I, and Building The Station at Potomac Yard: A Model for Public/Private Partnership.

BERKELEY FIRE DEPARTMENT MASTER PLAN | 5
APPENDIX A.

Page 252 of 306 ends
Page 352 ends

Berkeley Fire Department Mixed-Use Fire Station Case Studies November 10, 2022
support spaces, on-site training features, private bunk rooms and lockers for 15 fire fighters, and 20 parking spaces in a below grade garage.

Government stakeholders saw the opportunity to gain two benefits with one development by utilizing the air space above the fire station to build residential units. Eventually, this concept evolved into using these air rights to provide additional a ffordable housing for the city . Not only did the land donation provide cost savings for undertaking an affordable housing development, but it was also an opportunity to build up instead of further out. This was important to the community for maintaining the mixed-use urban feel of the planned development. The plan was to build four stories of housing directly over the fire station with a small amount of ground floor commercial space. To mitigate concerns regarding noise impacts on future residents, the desi gn included a concrete buffer between the fire station and the residential space and specific window and window frame designs. Note that unlike Fire Station 13 in San Francisco, the Station at Potomac Yards did not have to meet very high seismic safety
The Station at Potomac Yards was built in 2009 as a 100 percent subsidized housing development over the fire station. It includes 64 one-, two-, and three-bedroom units, a community meeting space, garden terrace with a community garden that provides free pro duce for residents, and underground parking. Forty-four of the units are set aside for households earning less than 60 percent Area Median Income (AMI) with the remaining units affordable to households at or below 80 percent AMI, and housing vouchers are accepted. The entire project, including the housing, fire station, and commercial space, is LEED and Earth Craft certified.

Getting the project built was a successful public private partnership between the City of Alexandria, Potomac Yards Development LLC, and the Alexandria Housing Development Corporation. Today, the housing is operated and maintained by the Alexandria Housing Development Corporation, and the fire station is operated and maintained by the City of Alexandria. The two entities operate using a condominium governance structure but with some shared responsibilities and spaces. As shown in FIGURE 1, the project was able to utilize a variety of sources of financing and funding, and FIGURE 2 demonstrates how the financial resources were allocated. Notably, this project was the very first use of the Low-Income Housing Tax Credits (LIHTC) in Alexandria. Additionally, the Developer donated the land for this project which, although not captured in the sources or uses below, is a significant contribution to the feasibility of the project given that the value of the land at that time was approximately $3 million.

BERKELEY FIRE DEPARTMENT MASTER PLAN | 6
APPENDIX A.

Page 253 of 306 ends
Page 353 ends

Berkeley Fire Department Mixed-Use Fire Station Case Studies November 10, 2022
FIGURE 1. SOURCES OF FUNDING AND FINANCING
Low Income Housing Tax Credit Equity (a) $8,626,657
Virginia Housing Development Authority Construction/Permanent Loan $8,350,000 Potomac Yards Development LLC Grant for Fire Station (b) $6,600,000 Potomac Yards Development LLC Voluntary Affordable Housing Contribution $6,000,000 City of Alexandria Loan to Alexandria Housing Development Corporation (c) $1,900,000 City of Alexandria Grant for 4th Fire Bay LEED Certification $1,000,000 Alexandria Housing Development Corporation Deferred Developers Fee $880,000 Potomac Yards Development LLC Lease Income $363,000
Potomac Yards Development LLC Contribution to Site Work and Open Space $275,000 Total $33,994,657
Source: City of Alexandria.

Notes:
(a) Awarded $1,027,000 and sold at 0.84
(b) This “grant” is a contribution from the developer.
(c) Included additional affordable housing contribution from Potomac Yards Development LLC and City of Alexandria Capital Improvement Project Funds.
(d) These figures are not inflation adjusted.

FIGURE 2. USES OF FUNDING AND FINANCING
Construction Hard Costs (a)
Housing (b) $18,297,138
Fire Station $9,200,000
Retail $800,000
Soft Costs (c) $2,392,519
Architectural and Engineering Costs (d) $1,280,000
Alexandria Housing Development Corporation Developer Fee $1,750,000 Tax Credit and Loan Fees $275,000
Total $33,994,657
Source: City of Alexandria.

Notes:
(a) Includes costs for underground parking garage with 142 spaces at $51,000 each. (b) Cost per residential unit was approximately $387,000. (c) Soft costs include construction management, permits and fees, insurance, transaction costs, legal, accounting, reserves, and more. (d) Architectural and engineering costs include consultant studies, value engineering, contract administration, and LEED AP. (e) These figures are not inflation adjusted. Construction costs have risen significantly since the time of this project.

Key findings from this case study provide a few lessons learned for other mixed -use fire station projects, including:

1. Developer contributions in the form of land donations and financial support made a significant impact on the ability to fund this project. This is an especially important consideration when including affordable housing units due to the costliness and complexity of building these units. Without the land donation, millions of dollars in additional funding would have been needed in order to purchase nearby land, or development capacity would have needed to be reduced.

2. Consideration of the appropriate parking ratios are important for making this type of project work financially. According to stakeholders interviewed for this case study, the project may have saved money by spending more time considering the correct parking needs for their project instead of applying the citywide parking ratio that was in place at that time. This project is widely considered overparked.

BERKELEY FIRE DEPARTMENT MASTER PLAN | 7
APPENDIX A.

Page 254 of 306 ends
Page 354 ends

Berkeley Fire Department Mixed-Use Fire Station Case Studies November 10, 2022

3. If incorporating affordable housing units, careful consideration of the affordability levels is important. Stakeholders interviewed for this study indicated that they decided to include” units priced at the 80 percent AMI level, but later learned that there was greater demand units at the 60 percent AMI level. These affordability thresholds impacted their ability to qualify for certain governmental financing., Ultimately, the project may have received additional funding if it had incorporated more deeply affordable units instead of workforce units.

4. Stakeholders in this case study also recommend that if utilizing a split governance structure, it is beneficial to consider responsibilities for operations and maintenance of shared spaces and building elements upfront in order to appropriately balance costs.

Lincoln Towers: Wilmington, DE
Lincoln Towers is a 100 percent affordable housing development built on top of a fire station located at 1800 N Dupont Street in the Trolley Square neighborhood of Wilmington, Delaware. Previously, this

0.7-acre site was public housing that was built in the 1970s, but it was in very poor condition by the early 2000s. The public housing on this site was demolished in 2010, and the new development broke ground in 2011. The site was considered by government officials and community stakeholders as an important spot for maintaining affordable housing. The addition of the fire station was considered a prime opportunity to address two community needs in one unified project. The fire station replacement was needed because the one serving that area, located just a few blocks away, had been in continuous operation since the 1800s and needed to be adapted to modern day operational needs.

The site is located in the lively Trolley Square neighborhood which has easy access to restaurants, parks, transit, and is generally considered one of the most desirable neighborhoods in Wilmington.

This site is zoned R -5-C: High density resident ial apartments . The surrounding area is zoned for neighborhood shopping with some residential zoning specific to rowhouses. According to data from the real estate data service CoStar, a t the time of this development there was very little active construction of multifamily development projects in the area , but of the developments that were occurring, most were relatively large, with more than 100 units each . The majority of the other developments in the area at this time were retail uses. However, because th is was a public housing redevelopment, market conditions did not have an impact on the financial viability or need for this project.

The 8-story development includes 88 one- and two-bedroom apartments for low-income seniors ages 62 and older. The housing is a mix of traditional public housing and units that are set aside for Section 8 voucher holders. Amenities for residents include a fitness center, computer lab, community space for supportive and social services, and underground parking. The fire station component of the development accommodates 16 firefighters and four battalion chiefs. The building is a “green” development in that it uses high energy efficiency systems and materials throughout.

Lincoln Towers is jointly operated with the City of Wilmingt on managing the fire station and the Wilmington Housing Authority managing the housing units. The project was developed by Michaels Development Company and the Wilmington Housing Authority utilizing a number of funding streams from the City of Wilmington, Prestige Affordable Housing Equity Partners, Delaware State Housing BERKELEY FIRE DEPARTMENT MASTER PLAN | 8
APPENDIX A.

Page 255 of 306 ends
Page 355 ends

Berkeley Fire Department Mixed-Use Fire Station Case Studies November 10, 2022
Authority, and the United States Department of Housing and Urban Development (HUD). The development cost approximately $27.5 million and utilized the following sources6:
• Approximately $10 million in “green grant” money from the American Recovery and Reinvestment Act
• Approximately $3.5 million from the City of Wilmington for the fire station • 4% Low Income Housing Tax Credits
• Tax exempt bonds issued by the City of Wilmington
• Federal Home Loan Bank Funds
• Wilmington Housing Authority Replacement Housing Factor Funds, which are funds available from HUD for public housing authorities that have demolished public housing for the sole purpose of developing new public housing
Key take aways from this case study include the following:

1. Having the publicly owned land provided an important opportunity to build a new fire station in addition to replacing the public housing.

2. The grant from the American Recovery and Reinvestment Act incentivized the green building, but it was also essential to the project’s success.

3. Other funds were available to build this project because it was a public housing replacement.

Without these sources, the project could not have been built. A layered funding approach, which is typical for affordable housing projects, was important here because there was no “value” to be captured from a private development component.

6 Affordable Housing Finance, 2014; Delaware Business Now, 2013.

BERKELEY FIRE DEPARTMENT MASTER PLAN | 9
APPENDIX A.

Page 256 of 306 ends
Page 356 ends

Bronchospasms
Findings Presentation
Berkeley Fire
Department
Master Plan
May 16, 2023 – Berkeley City Council Presentation DRAFT Siegel & Strain Architects
Mary McGrath Architects

Page 257 of 306 ends
Page 357 ends

2 BFD Studies and Reorganization
January 2020 Fire Chief Staff Report
which identified need to study Operations,
Response Times, and create a Facilities
Master Plan.
● The draft Standards of Coverage analysis
and report prepared by Citygate Associates
(first ever assessment)
● Internal Operations Reorganization
discussions and plan
● BFD Facilities Master Plan, prepared by
Siegel & Strain Architects and
Mary McGrath Architects, 2022 - 2023

Page 258 of 306 ends
Page 358 ends

3 Purpose of BFD Facilities Master Plan
• Evaluate aging and outdated facilities
• Identify operational changes and impact on facilities • Integrate health, safety and personnel need
• Make the most conservative improvements possible that meet goals • Improve public safety by addressing current and projected needs • Comply with industry standards and align with best practices • Support evolved mission now and into the future
Goals of BFD Facilities Master Plan

Page 259 of 306 ends
Page 359 ends

Presentation Outline
4 ● Facility Background
● Operational Changes
● Methodology
● Site Studies and
Recommendations
● Priorities and Phasing

Page 260 of 306 ends
Page 360 ends

5 Original Facilities
BFD is operating in facilities
built between 1960 and 2010
with the majority built in the
1960’s. Most were designed as
neighborhood fire stations with:
● A single fire engine
● Three personnel per shift
● Limited space for expansion,
storage, and future needs.

Page 261 of 306 ends
Page 361 ends

Operational Changes –
Evolving Mission of BFD
6

Page 262 of 306 ends
Page 362 ends

Operational Changes -
Apparatus and Specialty Units
Since the 1960’s Berkeley’s fire operations and
equipment have changed.
● Firefighters have moved from the tailboard to inside, seated and belted
● Addition of Ambulance Service with interns
● Addition of Wildfire Urban Interface program with
crossed staffed units (Type VI and water tankers)
● Addition of specialty equipment and units including air units, hazardous materials units, ATV’s, and a Water
Rescue program. 7

Page 263 of 306 ends
Page 363 ends

8 Modified Facilities
Since their original construction
in the 1960s, the older stations
have been renovated and
changed to accommodate:
● Seismic upgrades in the 1990’s
● Additional units and staffing
without adding or expanding the
spaces for privacy, health and
safety protocols.
● Ongoing minor upgrades and
maintenance including lighting,
kitchens, restrooms and the like.

Page 264 of 306 ends
Page 364 ends

9 Outdated Facilities
Facilities are are approaching end of useful life.
• Limited expansion space at stations
• Stations do not meet health safety standards
• Stations are not hazards ready
• Hose drying towers are obsolete
• Stations do not support the evolving culture of the fire department

Page 265 of 306 ends
Page 365 ends

Operational Changes -
Response and Delivery Changes
The Citygate Standards of Coverage report and Internal Operations Reorganization efforts identified need for additional operational changes and space accommodations for:
● Additional Ambulances
● Community Paramedic Program (Mobile Integrated Paramedic, MIP) ● Expanding administrative for WUI and EMS
● Larger dispatch center to allow for triaging of calls and pre-arrival instructions (requires fire to vacate 2100 HQ)
● Future Battalion Chief (Recommended by Citygate, proposed at Station 1) ● Increased staffing to address changing risk/demand from climate change & development 10

Page 266 of 306 ends
Page 366 ends

Operational Changes -
Electrification
The City and State are moving towards all
electric buildings and vehicles.
● New Stations are required to be all electric.
● Electric charging stations will be necessary
for BFD electric vehicles and apparatus, and
for staff’s personal electric vehicles.
● Public safety buildings will need to function
off the grid in emergency situations and
power outages.
11

Page 267 of 306 ends
Page 367 ends

Health, Safety, and Personnel –
Decontamination
Significant health and safety concerns related to carcinogens from turnout gear and equipment, and the overall air quality a Fire Stations have long been identified as unsafe. Since the 1960’s the fire service has started to implement best practices to combat this issue:
● Dedicated turnout rooms with personnel decontamination and turnout cleaning facilities.
● Reorganized path of travel to and from the apparatus bay for decontamination between each call.
(Known as the "Hot, Warm and Cool" zone organization.)
● Hands-free medical cleanup facilities
● Dedicated physical fitness rooms (not in apparatus bays), and airlock air separation between apparatus bay and living/office quarters ● Direct capture or similar vehicle exhaust systems in apparatus bays (Completed in 2001) 12

Page 268 of 306 ends
Page 368 ends

13 Health, Safety, and Personnel –
Inclusion & Privacy Considerations
Since the 1960's there have been
significant changes in the workforce and
work environment driving the need for
increased privacy in the fire stations in the
living and office environment:
● Gender neutral restrooms
● Single occupancy bedrooms
● Dedicated Captains’ offices
● Accessible accommodations

Page 269 of 306 ends
Page 369 ends

14 Methodology
The planning team’s approach for developing the master plan was to:

1. Study existing facilities and review provided construction drawings;

2. Document the fire department’s program needs;

3. Lay out the program needs over the existing sites and buildings plans;

4. Initial planning efforts attempted to accommodate programmatic needs through renovation;

5. When renovation was not possible, the design team studied replacement options.

High level findings:
● The new Mobile Integrated Paramedic program (or MIP) and additional ambulances could not be accommodated on existing sites, whether renovation or new construction. This program element was removed from the station scope due to space constraints and needs to be located at a different (new) facility.
● Reserve apparatus take up a lot of space at stations. These could be relocated to a new warehouse location which could also facilitate ongoing maintenance. ● Parking was a variable for the replacement options. Some sites accommodate parking better than others.

Page 270 of 306 ends
Page 370 ends

15 Renovation Approach - Space Addition and
Arrangement Priorities
● Provide private sleeping rooms for all on-duty staff
● Provide private gender-neutral restrooms and increase numbers based on added staff.
● Provide dedicated Turnout storage, decontamination and proper paths of travel
● Provide dedicated Fitness Room (out of apparatus bay/exhaust) ● Provide office space for on-duty supervisor
● Increase size of kitchen, dining and dayroom to accommodate added staff.
● Add apparatus bays for future units (Station 1 and 4)

Page 271 of 306 ends
Page 371 ends

Replacement Approach –
New Construction
16 ● Capture 100% of operational program
including new units apart from parking.
● Add as much parking as possible,
including options for fully parked stations.

Page 272 of 306 ends
Page 372 ends

17 Mixed Use Case Study
As part of the master plan, economics planner Strategic Economics researched three mixed-use projects with affordable housing and a fire station.

Fire Station 13, San Francisco, CA Potomac Yard, Alexandria VA Lincoln Towers in Wilmington, DE

Page 273 of 306 ends
Page 373 ends

18 Mixed Use Case Study Findings
Strategic Economics found that given the costs associated with the seismic safety requirements for fire stations in California, pairing affordable housing with a fire station is not cost-effective in Berkeley.
● Developer contributions to funding mixed-use fire stations are only possible when the private development generates enough value to pay for the extra construction costs without impacting expected rates of return for the overall project.
● Each project studied benefitted from having other funding sources already in place to offset some costs.
● California’s seismic building codes are extremely stringent for public safety buildings making them difficult (and expensive) to pair with other uses.

Page 274 of 306 ends
Page 374 ends

Site Studies & Recommendations
● Stations 1 – 6
● Division of Training
● Fire Department
Headquarters
19

Page 275 of 306 ends
Page 375 ends

Fire Station Space Needs
> Public Lobby and
Restroom
> Watch Office
> Supervisor Office
20 > Mechanical Room
> Electrical Room
> Communications
Equipment Room
> Circulation
> Storage
> Kitchen
> Dining
> Day Room
> Bedrooms
> Bathrooms
> Laundry
> NEW Fitness Room 4% of total
> Apparatus Bay
> Medical Supply
> Clean Up
> Workshop
> Restroom
> NEW Turnout Gear Room 7% of
total

Page 276 of 306 ends
Page 376 ends

Station 1 Overview - 2442 Eighth Street
21 Existing – 5,410 sf 2 story building
Fire House Company Make-up –
Staffing Per Shift
Current Need
Engine 1 – Captain, Engineer,
Firefighter/Paramedic
3 4
Medic 1 (Ambulance) – Medic,
EMT
2 2
Future Additional
Ambulance/Future Mobile
Integrated Paramedic (MIP)
0 2
Future Battalion Chief 0 1
Medic Trainee 1 1
Ambulance – Reserve 0 0

TOTAL CURRENT AND PLANNED

STAFFING
6 11

Page 277 of 306 ends
Page 377 ends

Station 1: Option 1
22 15,700 sf 2 story building renovation & additional area Purchase three adjacent properties, expand and renovate station.

SITE / FIRST FLOOR DIAGRAM
ROM Project Budget $34-40M

Page 278 of 306 ends
Page 378 ends

Station 1: Option 2
23 15,700 sf 2-story Fire Station. Replace existing station and replace with new. Purchase three properties and provide surface parking.

SITE / FIRST FLOOR DIAGRAM
ROM Project Budget $32-37M

Page 279 of 306 ends
Page 379 ends

Station 1: Option 3
24 15,700 sf 2-story building & basement parking
Replace existing station and replace with new. Purchase three properties and provide basement parking and drive through bays. Meets program.

SITE / FIRST FLOOR DIAGRAM
ROM Project Budget $40-45M

Page 280 of 306 ends
Page 380 ends

Station 1: Option 4
25 NEW LOCATION– 15,700 sf 2 story building, plus parking.

Purchase new property and replace station.

ROM Project Budget $42-47M

Page 281 of 306 ends
Page 381 ends

26 Station 2 Overview - 2029 Berkeley Way
Existing – 13,598 sf 2 story building
Fire House Company Make-up –
Staffing Per Shift
Current Need
Truck 2 – Captain, Engineer,
Firefighter/Paramedic
3 4
Engine 2 – Captain, Engineer,
Firefighter/Paramedic
3 4
Medic 2 – Medic, EMT 2 2
Medic Supervisor 1 1
Battalion Chief 1 1
Medic Trainee 1 1
Type VI 4x4 - Cross Staffed 0 0
Hazardous Materials Unit – Cross
Staffed
0 0
Truck – Reserve 0 0
Ambulance – Reserve 0 0

TOTAL CURRENT AND PLANNED

STAFFING
11 13

Page 282 of 306 ends
Page 382 ends

27 Station 2: Option 1
21,000 sf 3-story building. Renovate existing station add 3rd level. Parking and adjacency requirements not met.

ROM Project Budget $35-40M

Page 283 of 306 ends
Page 383 ends

28 Station 2: Option 2
21,000 sf 3 story building. Replace with three story station including rooftop parking. Parking requirement not met.

ROM Project Budget $40-45M

Page 284 of 306 ends
Page 384 ends

29 Station 2: Option 3
21,000 sf 3 story building. Replace with three story station.

Includes two levels of rooftop parking.

ROM Project Budget $51-56M

Page 285 of 306 ends
Page 385 ends

30 Station 3 Overview - 2710 Russell Street
Existing – 5,582 sf 2 story building
Fire House Company Make-up –
Staffing Per Shift
Current Need
Engine 3 – Captain, Engineer,
Firefighter/Paramedic
3 4
Medic 3 (Ambulance) – Medic,
EMT
2 2
Medic Trainee 1 1
Ambulance – Reserve 0 0

TOTAL CURRENT AND PLANNED

STAFFING
6 7

Page 286 of 306 ends
Page 386 ends

31 Station 3: Option 1
6, 193 sf 2 story building
Renovate and reconfigure station to add Turnout and Fitness ROM Project Budget $12-16M

Page 287 of 306 ends
Page 387 ends

32 Station 4 Overview - 1900 Marin Avenue
Existing – 5,341 sf 2 story building
Fire House Company Make-up –
Staffing Per Shift
Current Need
Engine 4 – Captain, Engineer,
Firefighter/Paramedic
3 4
Future Ambulance 0 2
Future Medic Intern 0 1
Reserve Engine 0 0

TOTAL CURRENT AND PLANNED

STAFFING
3 7

Page 288 of 306 ends
Page 388 ends

33 Station 4: Option 1
6,941 sf 2 story building. Addition to add turnout and fitness. Does not meet need to add ambulance at this location. Parking and privacy goals not met.

ROM Project Budget $4-6M

Page 289 of 306 ends
Page 389 ends

34 Station 4: Option 2
12,800 sf 2 story building. Expand site and add basement parking. Replace station to add new ambulance and meet safety requirements.

ROM Project Budget $36-41M

Page 290 of 306 ends
Page 390 ends

35 Station 5 Overview - 2680 Shattuck Avenue
Existing – 9,369 sf 2 story building
Fire House Company Make-up –
Staffing Per Shift
Current Need
Truck 5 – Captain, Engineer,
Firefighter/Paramedic
3 4
Engine 5 – Captain, Engineer,
Firefighter/Paramedic
3 4
Medic 5 – Medic, EMT 2 2
Medic Intern 1 1
Type VI 4x4 - Cross Staffed 0 0
Engine – Reserve 0 0
Utility Pick-up (F-250) 0 0

TOTAL CURRENT AND PLANNED

STAFFING
9 11

Page 291 of 306 ends
Page 391 ends

36 Station 5 : Option 1
17,000 sf 2 story building
Reconfigure and expand station. Parking not met.

SITE / FIRST FLOOR DIAGRAM
ROM Project Budget $18-23M

Page 292 of 306 ends
Page 392 ends

37 Station 5: Option 2
17,000 sf 2 story building
Replace station on existing site. Parking requirement not met.

SITE / FIRST FLOOR DIAGRAM
ROM Project Budget $33-38M

Page 293 of 306 ends
Page 393 ends

38 Station 5: Option 3
17,000 sf 2 story building
Replace building with basement parking. Program met.

SITE / FIRST FLOOR DIAGRAM
ROM Project Budget $53-58M

Page 294 of 306 ends
Page 394 ends

39 Station 6 Overview - 999 Cedar Street
Existing – 4,596 sf 1 story building
Fire House Company Make-up –
Staffing Per Shift
Current Need
Engine 6 – Captain, Engineer,
Firefighter/Paramedic
3 4
Reserve Engine 0 0

TOTAL CURRENT AND PLANNED

STAFFING
3 4

Page 295 of 306 ends
Page 395 ends

40 Station 6: Option 1
6,312 sf 1 story building
Renovation and addition using training site.

SITE / FIRST FLOOR DIAGRAM
ROM Project Budget $11.6-15M

Page 296 of 306 ends
Page 396 ends

41 Station 7 Overview - 3000 Shasta Road
Existing – 6,920 sf 2 story building
Fire House Company Make-up –
Staffing Per Shift
Current Need
Engine 7 – Captain, Engineer,
Firefighter/Paramedic
3 4
Surge Unit Type VI - Cross
Staffed
3 4
Reserve Engine Type 1 0 0
Polaris (2 total) 0 0
Water Tender (2 total) 0 0

TOTAL CURRENT AND PLANNED

STAFFING
6 8

Page 297 of 306 ends
Page 397 ends

42 Station 7: Option 1
8,000 sf 2 story building
Reconfigure and expand to add additional living quarters & fitness ROM Project Budget $10-13M

Page 298 of 306 ends
Page 398 ends

43 Division of Training Overview - 997 Cedar Street
Existing – 3,893 sf 1+ story building

Page 299 of 306 ends
Page 399 ends

44 Division of Training – Richmond
Proposal – Joint 30,694 sf training facility with cities of Albany, Richmond, and El Cerrito
ROM Project Budget $81-90M

Page 300 of 306 ends
Page 400 ends

45 Division of Training – El Cerrito
Proposal – Joint 12-acre training facility with cities of Albany, Richmond, and El Cerrito

Page 301 of 306 ends
Page 401 ends

46 Fire Headquarters Overview - 2100 MLK Jr. Way
Existing – 11,789 sf in the Public Safety 2 story building

Page 302 of 306 ends
Page 402 ends

47 Fire Headquarters - TBD
Proposal – Relocate the Fire administration offices, EOC center, and Ambulance program.

Headquarters Space Needs Program
Fire Department Admin 1,735
Fire Department Training Division 1,788
Fire Department Finance 1,147
Fire Department EMS 842
Fire Department Emergency Management 543
Fire Prevention 1,458
Wildland Division 707
Fire Department Shared and Support Spaces 3,676
Utility Support Spaces 544
Circulation at 30% 4,736
Headquarters Subtotal (SF) 17,176
Training Classroom Space Needs Program
Main Classroom 2,208
Equipment Storage 180
Table and Chair Storage 192
Secondary Classroom 768
Training Classrooms Subtotal (SF) 3,348
Headquarters Subtotal (SF) 17,176
Training Classrooms Subtotal (SF) 3,348
Ambulance Deployment Center Subtotal (SF) 8,324
Grossing Factor 15% 4,327
Grand Total 33,175
ROM Project Budget $33-36M

Page 303 of 306 ends
Page 403 ends

48 Priorities and Phasing
Phased process starting with
the most impacted stations –
Stations 1, 2 & 5 with goal to
increase staffing in the
Downtown area:
● Recommendation is to start with
Station 1 relocation and then use the
existing station as a temporary
station.
● Station 2 and 5 are the most impacted
by density and are high priorities.
● A new Training Center and
Headquarters are also high priorities.

Page 304 of 306 ends
Page 404 ends

49 Priorities and Phasing

Page 305 of 306 ends
Page 405 ends

Bronchospasms
Thank you
50

Page 306 of 306 ends
Page 406 ends
← All documents from this meeting