Tuesday, November 14, 2023 AGENDA Page 1
P R O C L AM AT I O N
C AL L I N G A S P E C I AL M EE TI NG O F T HE
B E R K E LE Y CI T Y C O U N CIL
In accordance with the authority in me vested, I do hereby call the Berkeley City Council in special session as follows:
Tuesday, November 14, 2023
4:00 PM
SCHOOL DISTRICT BOARD ROOM - 1231 ADDISON STREET, BERKELEY, CA 94702 TELECONFERENCE LOCATION - 1404 LE ROY AVE, BERKELEY, CA 94708
JESSE ARREGUIN, MAYOR
Councilmembers:
DISTRICT 1 – RASHI KESARWANI DISTRICT 5 – SOPHIE HAHN
DISTRICT 2 – TERRY TAPLIN DISTRICT 6 – SUSAN WENGRAF
DISTRICT 3 – BEN BARTLETT DISTRICT 7 – RIGEL ROBINSON
DISTRICT 4 – KATE HARRISON DISTRICT 8 – MARK HUMBERT
This meeting will be conducted in a hybrid model with both in-person attendance and virtual participation. If you are feeling sick, please do not attend the meeting in person.
Live captioned broadcasts of Council Meetings are available on Cable B -TV (Channel 33) and via internet accessible video stream at http://berkeley.granicus.com/MediaPlayer.php?publish_id=1244.
Remote participation by the public is available through Zoom. To access the meeting remotely: Join from a PC, Mac, iPad, iPhone, or Android device: Please use this URL: https://cityofberkeley-info.zoomgov.com/j/1617610462 To request to speak, use the “raise hand” icon by rolling over the bottom of the screen. To join by phone: Dial 1- 669-254-5252 or 1-833-568-8864 (Toll Free) and enter Meeting ID: 161 761 0462. If you wish to comment during the public comment portion of the agenda, Press *9 and wait to be recognized by the Chair. Please be mindful that the meeting will be recorded.
To submit a written communication for the City Council’s consideration and inclusion in the public record, email [email protected].
This meeting will be conducted in accordance with the Brown Act, Government Code Section 54953 and applicable Executive Orders as issued by the Governor that a re currently in effect. Any member of the public may attend this meeting. Questions regarding public participation may be addressed to the City Clerk Department (510) 981-6900.
The City Council may take action related to any subject listed on the Agenda.
Pursuant to the City Council Rules of Procedure and State Law, the presiding officer may remove, or cause the removal of, an individual for disrupting the meeting. Prior to removing an individual, the presiding officer shall warn the individual that their behavior is disrupting the meeting and that their failure to cease their behavior may result in their removal. The presiding officer may then remove the individual if they do not promptly cease their disruptive behavior. “Disrupting” means engaging in be havior during a meeting of a legislative body that actually disrupts, disturbs, impedes, or renders infeasible the orderly conduct of the meeting and includes, but is not limited to, a failure to comply with reasonable and lawful regulations adopted by a legislative body, or engaging in behavior that constitutes use of force or a true threat of force.
Tuesday, November 14, 2023 AGENDA Page 2
Preliminary Matters
Roll Call:
Action Calendar
The public may comment on each item listed on the agenda for action as the item is taken up. For items moved to the Action Calendar from the Consent Calendar or Information Calendar, persons who spoke on the item during the Consent Calendar public comment period may speak again at the time the matter is taken up during the Action Calendar.
The Presiding Officer will request that persons wishing to speak line up at the podium, or use the "raise hand" function in Zoom, to determine the number of persons interested in speaking at that time. Up to ten (10) speakers may speak for two minutes. If there are more than ten persons interested in speaking, the Presiding Officer may limit the public comment for all speakers to one minute per speaker. Speakers are permitted to yield their time to one other speaker, however no one speaker shall have more than four minutes. The Presiding Officer may, with the consent of persons representing both sides of an issue, allocate a block of time to each side to present their issue.
Action items may be reordered at the discretion of the Chair with the consent of Council.
1. Alameda County Transportation Commission San Pablo Avenue Multimodal Corridor Program: Safety Enhancement and Parallel Bike Improvements Projects
From: City Manager
Recommendation: Adopt a Resolution:
1. Approving the conceptual designs for the San Pablo Avenue Multimodal Corridor Program: Safety Enhancements and Parallel Bike Improvements Projects; as well as the Addison Street Bike Boulevard Connector, within the City of Berkeley (City);
2. Authorizing the City Manager to direct City staff to partner with the Alameda County Transportation Commission (Alameda CTC) on final design and implementation of these projects; and
3. Authorizing the City Manager to direct staff to grant permits for construction activities within City right-of-way, contingent on City staff approval of final construction drawings and specifications from Alameda CTC.
Financial Implications: See report
Contact: Liam Garland, Public Works, (510) 981-6300
Adjournment
I hereby request that the City Clerk of the City of Berkeley cause personal notice to be given to each member of the Berkeley City Council on the time and place of said meeting, forthwith.
IN WITNESS WHEREOF, I have hereunto set my hand and caused the official seal of the City of Berkeley to be affixed on this 2nd day of November, 2023.
Jesse Arreguin, Mayor
Public Notice – this Proclamation serves as the official agenda for this meeting.
Tuesday, November 14, 2023 AGENDA Page 3
ATTEST:
Date: November 2, 2023
Mark Numainville, City Clerk
NOTICE CONCERNING YOUR LEGAL RIGHTS: If you object to a decision by the City Council to approve or deny a use permit or variance for a project the following requirements and restrictions apply: 1) No lawsuit challenging a City decision to deny (Code Civ. Proc. §1094.6(b)) or approve (Gov. Code 65009(c)(5)) a use permit or variance may be filed more than 90 days after the date the Notice of Decision of the action of the City Council is mailed. Any lawsuit not filed within that 90 -day period will be barred. 2) In any lawsuit that may be filed against a City Council decision to approve or deny a use permit or variance, the issues and evidence will be limited to those raised by you or someone else, orally or in writing, at a public hearing or prior to the close of the last public hearing on the project.
Archived indexed video streams are available at:
https://berkeleyca.gov/your-government/city-council/city-council-agendas.
Channel 33 rebroadcasts the following Wednesday at 9:00 a.m. and Sunday at 9:00 a.m.
Communications to the City Council are public record and will become part of the City’s electronic records, which are accessible through the City’s website. Please note: e-mail addresses, names, addresses, and other contact information are not required, but if included in any communication to the City Council, will become part of the public record. If you do not want your e-mail address or any other contact information to be made public, you may deliver communications via U.S. Postal Service to the City Clerk Department at 2180 Milvia Street. If you do not want your contact information included in the public record, please do not include that information in your communication. Please contact the City Clerk Department for further information.
Any writings or documents provided to a majority of the City Council regarding any item on this agenda will be made available for public inspection at the public counter at the City Clerk Department located on the first floor of City Hall located at 2180 Milvia Street as well as posted on the City's website at https://berkeleyca.gov/.
Agendas and agenda reports may be accessed via the Internet at:
https://berkeleyca.gov/your-government/city-council/city-council-agendas and may be read at reference desks at the following locations:
City Clerk Department - 2180 Milvia Street, First Floor Tel: 510-981-6900, TDD: 510-981-6903, Fax: 510-981-6901 Email: [email protected]
Libraries: Main – 2090 Kittredge Street,
Claremont Branch – 2940 Benvenue, West Branch – 1125 University, North Branch – 1170 The Alameda, Tarea Hall Pittman South Branch – 1901 Russell
COMMUNICATION ACCESS INFORMATION:
This meeting is being held in a wheelchair accessible location.
To request a disability-related accommodation(s) to participate in the meeting, including auxiliary aids or services, please contact the Disability Services specialist at (510) 981-6418 (V) or (510) 981-6347 (TDD) at least three business days before the meeting date.
Please refrain from wearing scented products to this meeting.
Captioning services are provided at the meeting, on B-TV, and on the Internet. In addition, assisted listening devices for the hearing impaired are available from the City Clerk prior to the meeting, and are to be returned before the end of the meeting.
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: https://berkeleyca.gov/
ACTION CALENDAR
November 14, 2023
To: Honorable Mayor and Members of the City Council
From: Dee Williams-Ridley, City Manager
Submitted by: Liam Garland, Director, Public Works
Subject: Alameda County Transportation Commission San Pablo Avenue Multimodal Corridor Program: Safety Enhancement and Parallel Bike Improvements Projects
RECOMMENDATION
Adopt a Resolution:
1. Approving Alameda County Transportation Commission (Alameda CTC’s) conceptual designs for the San Pablo Avenue Multimodal Corridor Program: Safety Enhancements and Parallel Bike Improvements Projects; as well as the Addison Street Bike Boulevard Connector, within the City of Berkeley (City);
2. Authorizing the City Manager to direct City staff to partner with the Alameda CTC on final design and implementation of these projects; and
3. Authorizing the City Manager to direct City staff to grant permits for construction activities within City right-of-way, contingent on City staff approval of final construction drawings and specifications from Alameda CTC.
SUMMARY
The Alameda CTC is leading the development of the San Pablo Avenue Multimodal Corridor Program, which consists of three projects to improve safety and multimodal access: the Safety Enhancements Project (Berkeley and Albany); the Parallel Bike Improvements Project (Berkeley, Albany, and North Oakland); and the Bus and Bike Lane Project (Oakland, Emeryville, and South Berkeley). The goals of the program are to enhance safety for all travel modes, improve comfort and quality of trips for all users, support a strong local economy and efficiently accommodate growth along the corridor while respecting local contexts, and promote equitable transportation and design solutions for diverse communities throughout the corridor. The three projects were identified as part of a multi-year corridor planning effort conducted from 2017-2021, which included multiple rounds of community engagement, concluding with the Alameda CTC adopting an overall San Pablo Avenue corridor concept in March 2022. Alameda CTC, in partnership with the City and other agency partners, has conducted preliminary
Alameda County Transportation Commission San Pablo Avenue ACTION CALENDAR Multimodal Corridor Program: Safety Enhancement and November 14, 2023 Parallel Bike Improvements Projects
design and outreach on design details for the Safety Enhancements Project and Parallel Bike Improvements Project. However, preliminary design and outreach for the Bus and Bike Lane Project is being done separately and thus this project is not the subject of this report.
As a separate project, City Staff are leading the Addison Street Bike Boulevard Project, which would implement bicycle boulevard improvements along Addison Street between Aquatic Park and Sacramento Street and between Milvia Street and UC Berkeley Campus. Because the Addison Street Bike Boulevard overlaps with the Alameda CTC’s Safety Enhancements Project at the intersection of San Pablo Avenue and Addison Street, City staff led a separate concept design development and outreach process for the Addison Street Bike Boulevard connection across San Pablo Avenue. Following concept design approval, Alameda CTC will include the Addison Street Bike Boulevard Connector at San Pablo Avenue as part of the Safety Enhancements Project. The City will implement the other portions of the Addison Street Bike Boulevard as a separate project.
Therefore, this report seeks Council approval for three concept designs: Alameda CTC’s Safety Enhancements Project; Alameda CTC’s Parallel Bike Improvements Project; and the City-led Addison Street Bike Boulevard Connector (to be implemented by Alameda CTC as part of the Safety Enhancements Project).
The concept designs have been developed and refined by Alameda CTC based on input from the public and City staff from Public Works; Parks, Recreation and Waterfront; and Fire. The concept designs are consistent with adopted City plans, including the 2017 Bike Plan, the 2020 Pedestrian Plan, the 2022 Transit First Implementation Plan, and the 2020 Vision Zero Action Plan.
City and Alameda CTC staff seek City Council approval for the three conceptual designs; authorization to proceed with detailed engineering design; issuance of construction permits contingent on City staff approval of final design; and authorization to grant permits for construction activities in the City right-of-way. Following City Council approval of concept designs, Alameda CTC will complete environmental clearance, secure necessary Caltrans approvals for improvements along San Pablo Avenue (State Route 123), and lead final design and construction of the projects, including the Addison Street Bike Boulevard Connector, in coordination with City staff.
Alameda CTC is seeking the City’s concept approval for these two San Pablo Avenue Corridor Projects in order to keep the federally-funded engineering design and construction phases on schedule and not endanger Alameda CTC’s federal aid grant funding. Alameda CTC plans to fast-track completion of detailed engineering design in order to seek allocation of construction funding in 2024.
Alameda County Transportation Commission San Pablo Avenue ACTION CALENDAR Multimodal Corridor Program: Safety Enhancement and November 14, 2023 Parallel Bike Improvements Projects
FISCAL IMPACTS OF RECOMMENDATION
Design and construction of the projects is funded by the Alameda CTC. Alameda CTC is utilizing various federal, state, and local funds for design, public outreach, and construction of the Safety Enhancement and Parallel Bike Improvements Projects.
Therefore, the only direct fiscal impact is due to the allocation of City staff time to support this project.
CURRENT SITUATION AND ITS EFFECTS
Alameda CTC has developed a conceptual design for the Safety Enhancements and Parallel Bike Improvements Projects, conducted public engagement, and refined the design based on input from the public and City staff. In addition, Public Works staff have developed a conceptual design and conducted internal and external stakeholder engagement for the related Addison Bike Boulevard Connector.
Safety Enhancements Project Description
The Safety Enhancements Project extends along San Pablo Avenue from Oregon Street in South Berkeley to the Contra Costa County line in Albany. San Pablo Avenue in both Berkeley and Albany is Caltrans right-of-way as part of State Route 123. The project is focused on improving safety for pedestrians and bicyclists crossing San Pablo Avenue and targeted improvements to bus speed and reliability. Specific project components include:
• High visibility crosswalks and striping
• Pedestrian signals (also called Pedestrian Hybrid Beacons (PHBs) or High-intensity Activated Crosswalk (HAWK) signals)
• Rectangular Rapid Flashing Beacons (RRFBs)
• Median refuges
• ADA compliant curb ramps
• Improved bicycle crossings of San Pablo Avenue at intersections with bike routes, particularly offset crossings of San Pablo Avenue
• Bus bulbs at AC Transit Rapid stops
• Bus stop relocations from nearside to far side of intersection to reduce delays for buses and improve sightlines between motorists and pedestrian crossings • Bus stop length adjustments to accommodate frequent bus arrivals • Sidewalk repair within bus stop areas
• Targeted lighting improvements at crosswalks and bus stops • Leading pedestrian intervals
• Accessible pedestrian signal upgrades
Alameda County Transportation Commission San Pablo Avenue ACTION CALENDAR Multimodal Corridor Program: Safety Enhancement and November 14, 2023 Parallel Bike Improvements Projects
Attachment 2 includes the concept design and provides more details on the proposed improvements.
Parallel Bike Improvements Project Description
The Parallel Bike Improvements Project seeks to provide upgraded and contiguous biking facilities along local streets parallel and leading to San Pablo Avenue in Albany, Berkeley, and North Oakland. In Berkeley, the project includes improvements to Kains Avenue between the Albany border and Camelia Street, Harrison Street between 8th and 10th streets, Camelia Street between Stannage Avenue and 9th Street, Stannage Avenue between Camelia and Virginia Streets, portions of 9th Street in Berkeley between Harrison and Heinz Streets, Mabel Street from Ward Street to 66th Street, Idaho Street from 66th Street to the Oakland border, and 66th Street between Mabel Street and Idaho Street. The project takes advantage of the existing and planned bicycle boulevard/neighborhood bike route networks as defined in the 2017 Bike Plan.
Specific project elements include:
• Speed management traffic calming measures (traffic circles, speed tables) • Volume management traffic calming measures (diverters) • Improvements at bikeway crossings of major streets (arterial and collector streets) including PHBs/RRFBs, bulbouts, and median refuges
• Wayfinding improvements
Attachment 2 includes the concept design and provides more details on the proposed improvements.
Addison Street Bike Boulevard Connector Description
San Pablo Avenue has been identified as a high-injury street in the 2020 Berkeley Vision Zero Action Plan. The City-led Addison Street Bike Boulevard Connector would construct a Class IV separated bikeway connector across San Pablo Avenue to reduce future collision risk for vulnerable users crossing the street and will address a key barrier to east-west bicycle connectivity in the City.
City staff worked with a consultant, Alta Planning and Design, on a conceptual design and public outreach process for the Addison Street Bike Boulevard Connector. Two conceptual designs were developed: a one-way protected cycle track on both the west and east sides of San Pablo Avenue; and a two-way protected cycle track on the east side of San Pablo Avenue. Attachment 3 includes the concept design and provides more details on the proposed improvements.
Public outreach for the Addison Street Bike Boulevard Connector included postcards sent to residents within 300 feet of the project area informing them of the project and providing directions for how to attend a public meeting to provide feedback. Staff also distributed postcards in person to affected businesses along San Pablo Avenue. The conceptual designs were presented to the public, including representatives from the Office of Economic Development, and Walk Bike Berkeley, during a virtual meeting on
Alameda County Transportation Commission San Pablo Avenue ACTION CALENDAR Multimodal Corridor Program: Safety Enhancement and November 14, 2023 Parallel Bike Improvements Projects
September 26, 2023. In general, comments during the virtual meeting were related to parking, trees, and circulation impacts. One member of the public suggested an alternative bike boulevard route. Overall, external stakeholders present at the meeting generally preferred the one-way protected cycle track option because, while it would remove 8 parking spots compared to 4 under the two-way cycle track option, it would preserve a mature London Plane street tree (Platanus x hispanica) and maintain the right turn movement for vehicles turning east onto Addison Street. While City staff agrees with external and internal stakeholders that the one-way protected cycle track option is the preferred option, Alameda CTC will be analyzing the preferred concept design as part of the upcoming detailed engineering design phase for the larger corridor study. In the event Alameda CTC determines the one-way cycle track infeasible based on technical analysis during the subsequent detailed engineering design phase, they may choose to carry forward the two-way cycle track for detailed engineering and construction. Therefore, Public Works is recommending that Council approve the one- way cycle tracks as the preferred option, with the two-way cycle track as a fallback option. In the event that the fallback option is needed, Public Works would return to City Council with an update on the Alameda CTC detailed engineering design phase process at that time.
If this item is approved, Alameda CTC would shepherd the concept design described herein for the Addison Street Bike Boulevard Connector through the environmental clearance and Caltrans approvals and detailed engineering phases and would ultimately construct the project as part of the Safety Enhancements Project.
Inter-Agency and Internal Stakeholder Coordination
Since 2017, beginning with the initial scoping of the San Pablo Avenue Multimodal Corridor Program of Projects, Staff worked closely with Alameda CTC staff. Throughout the development of these projects, Staff has asked Alameda CTC staff to follow established City and Department of Public Works processes and workflow, including internal and external technical agency stakeholder review, public stakeholder engagement, Transportation and Infrastructure Commission review, and eventual City Council conceptual approval.
Alameda CTC staff have engaged Staff as well as colleagues from other cities along the project corridor, Alameda-Contra Costa Transit District (AC Transit), and Caltrans in seeking technical review and comment. As is typical for City-led transportation projects, Alameda CTC engaged multiple City departments through a series of design review and comment meetings. Where necessary, Alameda CTC and Staff have collaborated to solicit follow-up input and organized focused follow-up meetings to ensure engagement with all necessary City technical stakeholders. Staff comments have been incorporated through changes to the conceptual project design.
On September 5 and 28, 2023, City staff presented the concept design for the Addison Street Bike Boulevard Connector to internal City Department stakeholders from Public Works, Fire, and Parks, Recreation and Waterfront. Feedback from the internal City stakeholders have been incorporated into the conceptual design for this City-led project.
Alameda County Transportation Commission San Pablo Avenue ACTION CALENDAR Multimodal Corridor Program: Safety Enhancement and November 14, 2023 Parallel Bike Improvements Projects
Parking
The projects include several elements that will modify parking. These elements are described here and also depicted in Attachment 2 and Attachment 3.
The majority of parking impacts are a result of intersection safety “daylighting”.
Daylighting consists of eliminating on-street parking spaces at an intersection (up to 8 spaces at each intersection may be restricted) so that all road users have improved visibility at the intersection. Daylighting was recommended in the 2020 Berkeley Pedestrian Plan and was prioritized through a February 28, 2023 Council referral to develop a comprehensive intersection daylighting policy.1 California Assembly Bill 413 (AB-413), which was signed into law on October 10, 2023, makes it unlawful to park within 20 feet of a marked or unmarked crosswalk.
The Safety Enhancements Project includes changes to parking along San Pablo Avenue associated with relocating/lengthening bus stops and with daylighting intersections. Parking changes will typically remove between 1 and 3 spaces along any particular block, and in cases where parking spaces are removed due to a bus stop relocation, the parking removal will be at least partially offset by adding back some spaces in the vacated stop location. Where possible, color curbs will be replaced in a nearby location. Parking changes along San Pablo Avenue have been reviewed with adjacent businesses through door-to-door direct outreach and follow-up phone outreach. Based on their feedback, some proposed bus stop relocations and bus stop lengths were refined, as described in Attachment 2. As shown in Table 1, an estimated 14 spaces in 11 commercial areas on San Pablo Avenue within the City would be removed as a result of this project.
Table 1: Net Parking Change in the City of Berkeley
Net Parking Change
Project On San
Pablo Ave
On other Residential and
Non-residential Streets
Safety Enhancements Project -14 0
Parallel Bike Improvements Project 0 -152
Addison Street Bike Boulevard
Connector (one-way cycletrack option)
-7 -1
TOTAL -21 -153
The Parallel Bike Improvements Project includes changes to parking at intersections along bicycle boulevards primarily from daylighting of intersections and installation of traffic calming. An estimated 152 spaces in 33 locations on residential and non- residential streets parallel or nearby to San Pablo Avenue within the City would be removed as a result of this project.
1 Referral: Creation of an Intersection Daylighting Policy, Item 14, Berkeley City Council Meeting Agenda, February 28, 2023.
Alameda County Transportation Commission San Pablo Avenue ACTION CALENDAR Multimodal Corridor Program: Safety Enhancement and November 14, 2023 Parallel Bike Improvements Projects
The Addison Street Bike Boulevard Connector would remove parking spaces in order to install a cycle track and daylight the intersection. The preferred One-way Cycle Track option for the Addison Street Bike Boulevard Connector would eliminate a total of 8 parking spaces. The Two-way Cycle Track option would eliminate a total of 4 parking spaces.
In total, approximately 190 parking spaces would be removed throughout the project area. The project area is extensive, consisting of improvements along more than 2 miles of San Pablo Avenue and 3.4 miles of residential and non-residential streets within the City. Given the extremely large size of the project area, the comparatively small number of parking spaces that are impacted, and the intensive level of engagement, public notification, and direct outreach to affected residents and businesses, Alameda CTC has not completed a comprehensive parking inventory and occupancy study of the project area at this time.
Traffic Circulation
The Safety Enhancements Project includes circulation changes due to median closures at the intersections of San Pablo Avenue/Virginia Street, San Pablo Avenue/Channing Way, San Pablo Avenue/Pardee Street, and San Pablo Avenue/Blake Street. The proposed median closures would prohibit left turns into and out of the side street from San Pablo Avenue. The purpose of the median closures is to improve safety for all road users by eliminating motorists turning across multiple lanes of traffic at unsignalized intersections. At the intersections of San Pablo Avenue/Virginia Street and San Pablo Avenue/Channing Way, the median closures will also provide space for pedestrian and cyclist refuges while crossing San Pablo Avenue and will help manage traffic volumes along bicycle boulevard routes by preventing through-traffic from crossing San Pablo Avenue to continue along the Bicycle Boulevard routes.
The Parallel Bike Improvements Project includes circulation changes due to installation of new diverters at the intersections of Curtis Street/Channing Way and 9th Street/Jones Street as well as a modification to the existing diverter at 9th Street/Delaware Street.
Diverters are a common traffic calming treatment to manage volumes along residential streets in the City. Examples of diverters are common in the City and are used to prohibit motorists from using neighborhood streets as cut-through routes by forcing motorists to turn instead of proceeding through an intersection.
Alameda CTC has reviewed proposed circulation changes (median closures and diverters) with Public Works Staff and determined that viable alternate circulation routes are available. Alameda CTC also reviewed the proposed circulation changes with Berkeley Unified School District.
Alameda CTC has reviewed the proposed median closure and diverter locations with Fire and Zero Waste staff. Alameda CTC has incorporated Fire and Zero Waste requests for mountable diverters that permit passage for Fire and Zero Waste vehicles into the concept designs.
Alameda County Transportation Commission San Pablo Avenue ACTION CALENDAR Multimodal Corridor Program: Safety Enhancement and November 14, 2023 Parallel Bike Improvements Projects
The preferred option for the Addison Street Bike Boulevard Connector (the one-way cycle track option) would not involve any changes to vehicle turning movements.
However, the two-way cycle track would likely involve a right turn restriction for vehicles turning east onto Addison Street from San Pablo Avenue. Fire and Zero Waste staff reviewed this design option and requested that any new curbs in the public right-of-way include a chamfered edge and be mountable by Fire and Zero Waste vehicles. If the two-way cycle track is determined by Alameda CTC to be the only feasible design option after undergoing detailed technical analysis, a mountable curb at the right turn restriction bulb-out will be incorporated into the final design.
Public Engagement
Alameda CTC led a multi-year corridor planning effort conducted from 2017-2021 which included multiple rounds of community engagement and identified the basic scope elements of the Safety Enhancement and Parallel Bike Improvement projects. This outreach effort included a variety of methods including pop-up events, focus groups, intercept surveys, online surveys, open houses, and presentations to a project Active Transportation Working Group that garnered input from more than 4,900 people.
Between December 2022 and Summer 2023, through online, mailing, and in-person outreach activities, Alameda CTC has sought feedback from hundreds of merchants, residents, and others who rely on the San Pablo Avenue Corridor on the concept designs for the Safety Enhancement and Parallel Bike Improvement Projects. In total, public outreach generated more than 700 detailed comments on the two projects. Public outreach activities and meetings with stakeholders included:
On January 14, 2023, an Alameda CTC presentation to the Berkeley Neighborhood Council;
On January 25, 2023, an Alameda CTC presentation to the San Pablo Active Transportation Working Group comprised of multimodal advocacy groups including representatives from Walk Bike Berkeley;
From December 5-16, 2022, door-to-door outreach to all businesses along San Pablo Avenue that front proposed parking changes and follow-up phone outreach was conducted;
In spring, 2023, two rounds of post-card mailers were distributed to those on the same block or within 300 feet of proposed improvements, which informed residents and property owners of the projects and announced the availability of a project website and upcoming open house;
A project website, including an interactive project webmap with comment features that enabled users to view location-specific improvements;2 2 Alameda CTC, San Pablo Avenue Corridor Project, https://www.alamedactc.org/programs-projects/multimodal- arterial-roads/sanpabloave.
Alameda County Transportation Commission San Pablo Avenue ACTION CALENDAR Multimodal Corridor Program: Safety Enhancement and November 14, 2023 Parallel Bike Improvements Projects
On February 9, 2023, an Alameda CTC presentation to the Alameda CTC Bicycle and Pedestrian Advisory Committee;
On March 30, 2023, an in-person open house at the Berkeley Adult School on San Pablo Avenue in Berkeley hosted by the Alameda CTC and attended by more than 100 people; and
Email updates to a project mailing list.
Key themes from public engagement included suggestions for parallel bike boulevard routing, changes to bikeway facility type, traffic control devices at bike crossing of major streets, suggestions for more stop-control changes and traffic calming to minimize the need for cyclists to stop and slow traffic, signal operations changes, additional improvements on non-project streets, importance of accessibility for people with disabilities, implications from traffic redistribution where local circulation changes are proposed, parking, bus stop nuisance issues such as trash and crime, materials and landscaping, and comments related to other ongoing City projects. A summary of outreach activities, comment themes, and actions taken in response to comments is provided in Attachment B in Attachment 2.
Many public comments were incorporated through changes to the conceptual project design, which were subsequently reviewed by City staff for consistency with the City’s previous comments and with Council adopted plans, policies, and Public Works engineering design practices.
Staff have led a separate outreach process for the conceptual design of the Addison Street Bike Boulevard Connector. Staff and consultants with Alta Planning and Design led an online public meeting on September 26, 2023. In the leadup to this meeting, the project consultants mailed postcards regarding the project, including input opportunities and notification of the online public meeting to every address within 300 feet of the project area. In addition, City staff canvassed the area, reaching out directly to local businesses and properties with leave-behind postcards regarding the project. Public comment, combined with the technical input from City internal stakeholders, was a key input into the selection of the recommended concept design.
Transportation and Infrastructure Commission
On July 20, 2023, Alameda CTC staff presented the conceptual design for the San Pablo Avenue Multimodal Corridor Program Safety Enhancements and Parallel Bike Improvements projects to the Transportation and Infrastructure Commission. The Transportation and Infrastructure Commission passed a motion to recommend approval of the conceptual designs for the Safety Enhancements and Parallel Bike Improvements projects by the Berkeley City Council, as follows:
Item B1 - ACTC San Pablo Avenue Multimodal Corridor Program: Safety Enhancement and Parallel Bike Improvements Projects
Alameda County Transportation Commission San Pablo Avenue ACTION CALENDAR Multimodal Corridor Program: Safety Enhancement and November 14, 2023 Parallel Bike Improvements Projects
It was Moved / Seconded (Fixler / Raffanti) that the Transportation and Infrastructure Commission recommends City Council approve the Alameda County Transportation Commission concept design within Berkeley for the San Pablo Avenue Multimodal Corridor Program with the following adjustments and considerations:
Explore the potential funding for greening San Pablo Ave as part of this project, contribute to the overall urban design perspective in project scope, for example, bike racks, benches, bus stations, or other designs. Speed tables can be unpleasant for cyclists, the preferable design is diverters to remove thru traffic from bicycle boulevards altogether. If speed tables are added, a wheel gap for cyclist convenience is recommended.
Additionally, the Transportation and Infrastructure Commission recommends that the City Council direct City staff to partner with the Alameda County Transportation Commission on final design and implementation of these projects.
Outside of the scope of the San Pablo Avenue Multimodal Corridor Program, the Transportation and Infrastructure Commission recommends the Alameda County Transportation Commission investigate the following items for projects in the future:
Ensuring robust connections between cities that are hard to plan between, for example the Adams Street discontinuity between Berkeley and Albany. Explore future efforts to ensure Google, Apple Maps, Waze, and other direction apps do not lead drivers on bike boulevards and other designated bike routes.
Ayes: Fixler, Ghosh, Leung, Nesbitt, Raffanti, Walton, Yep; Noes: None; Abstain:
None; Absent: Parolek, Lutzker; Recused: None
Motion passed 7-0-0-2-0
Due to the timing of Council and Commission meetings, and the need for the Alameda CTC to continue to move forward on the San Pablo Avenue Multimodal Corridor Program projects, City staff have not yet presented the Addison Bike Boulevard Connector to the Transportation and Infrastructure Commission. Staff plans to brief the Commission on the project at an upcoming meeting, and given that the recommended concept design is consistent with the 2017 Berkeley Bicycle Plan and with other recent transportation projects, City staff does not anticipate this will substantially alter the selected conceptual design for this intersection. If Commission comments require substantial revisions to the concept design, City staff would return to City Council at a future meeting for approval of the updated intersection concept design.
Alameda County Transportation Commission San Pablo Avenue ACTION CALENDAR Multimodal Corridor Program: Safety Enhancement and November 14, 2023 Parallel Bike Improvements Projects
Environmental Clearance and Project Delivery Next Steps Alameda CTC is the lead agency for environmental clearance of the projects that comprise the San Pablo Avenue Multimodal Corridor Program. Alameda CTC will also include the Addison Street Bike Boulevard Connector in environmental documents as part of the Safety Enhancements Project. The Albany City Council approved the concept designs for the Safety Enhancements and Parallel Bike Improvement projects in July 2022. Upon receipt of approval from the Council, the Alameda CTC will advance the Safety Enhancements (including the Addison Bike Boulevard Connector) and Parallel Bike projects to subsequent project development phases. This includes obtaining necessary state and federal environmental clearance and developing final plans, specifications, and estimates. In addition, the Safety Enhancements Project, including the Addison Street Bike Boulevard Connector, require Caltrans’ approval of a Caltrans Project Report, which would be completed by the Alameda CTC.
BACKGROUND
The San Pablo Avenue Multimodal Corridor Program is a central program to achieving the goals and strategies adopted in the 2020 Countywide Transportation Plan. San Pablo Avenue is on the countywide High-injury Network and is identified in the 2020 Vision Zero Action Plan as a high-injury street. San Pablo Avenue has the third highest incidence of injury collisions in Alameda County. San Pablo Avenue is also one of the streets with the highest bus ridership in the East Bay. Therefore, the three projects that comprise the San Pablo Avenue Multimodal Corridor Program are being implemented to enhance safety for all travel modes and to improve comfort and quality of trips for all users. The three projects are:
• Safety Enhancements Project (Berkeley and Albany);
• Parallel Bike Improvements Project (Berkeley, Albany, and North Oakland); and • Bus and Bike Lane Project (Oakland, Emeryville, and South Berkeley).
The Bus and Bike Lane Project will provide side-running bus lanes and protected bike lanes along San Pablo Avenue from Downtown Oakland (16th Street) to Russell and Heinz Streets in South Berkeley. This project is not the subject of this report and outreach on design details will be conducted separately.
These projects were identified as part of a multi-year planning effort that began in 2017 and were approved by the Alameda CTC in March 2022. The fundamental purpose of the three projects is to implement safety and transit reliability improvements, including project recommendations from the City’s adopted plans, among them the 2017 Bike Plan, the 2020 Pedestrian Plan, the 2022 Transit First Implementation Plan, and the 2020 Vision Zero Action Plan.
In addition, the two projects support the City Strategic Plan because they advance our goals to: provide state-of-the-art, well-maintained infrastructure, amenities, and facilities; foster a dynamic, sustainable, and locally-based economy; create a resilient, safe,
Alameda County Transportation Commission San Pablo Avenue ACTION CALENDAR Multimodal Corridor Program: Safety Enhancement and November 14, 2023 Parallel Bike Improvements Projects
connected, and prepared city; and be a global leader in addressing climate change, advancing environmental justice, and protecting the environment.
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
The projects would result in a safer pedestrian environment, more efficient transit operations, improved bicycle routes, and would encourage more people to use public transportation and engage in active modes of transportation instead of driving. The Safety Enhancements and Parallel Bike Improvements Projects and the Addison Street Bike Boulevard Connector are consistent with the City’s 2009 Climate Action Plan Policy 5.a. that calls for expanding and improving the City’s bicycle and pedestrian infrastructure. The Climate Action Plan states that transportation modes such as public transit, walking, and bicycling must become the primary means of fulfilling the City’s mobility needs to meet the plan’s transportation sector emissions targets.
RATIONALE FOR RECOMMENDATION
The City has adopted numerous plans and policies, including the Bicycle Plan, Pedestrian Plan, Vision Zero Action Plan, Transit-First Policy, and Complete Streets Policy which call for transportation safety infrastructure investments. Approval of the concept design will keep the Parallel Bike Improvements Project on track to advertise for construction by Summer 2024, and the Safety Enhancements Project, including the Addison Street Bike Boulevard Connector, to advertise for construction in Spring 2025 consistent with grant requirement deadlines.
ALTERNATIVE ACTIONS CONSIDERED
Alameda CTC is seeking the City’s concept approval for these two San Pablo Avenue Corridor Projects in order to keep the federally-funded engineering design and construction phases on schedule and not endanger Alameda CTC’s federal aid grant funding. Alameda CTC plans to fast-track completion of detailed engineering design in order to seek allocation of construction funding in 2024. City Council could opt not to approve the conceptual designs and/or defer the item to a future Council agenda. This decision would delay the subsequent detailed engineering design and construction phases of the project and a delay could endanger Alameda CTC federal aid grant funding deadlines.
CONTACT PERSON
Hamid Mostowfi, Acting Transportation Manager (510) 981-6403 Eric Anderson, Principal Planner (510) 981-7062
Elliott Schwimmer, Associate Planner (510) 981-7066
Attachments:
1: Resolution
Alameda County Transportation Commission San Pablo Avenue ACTION CALENDAR Multimodal Corridor Program: Safety Enhancement and November 14, 2023 Parallel Bike Improvements Projects
2: Memo from the Alameda CTC to the Berkeley Transportation and Infrastructure Commission
A. Concept Design Boards
B. Outreach Summary Report
C. City of Berkeley Location-Specific Design Issues Technical Appendix D. Project Fact Sheets
3: Addison Street Bike Boulevard Connector Concept Design
RESOLUTION NO. ##,###-N.S.
SAN PABLO AVENUE MULTIMODAL CORRIDOR PROGRAM: SAFETY
ENHANCEMENTS AND PARALLEL BIKE IMPROVEMENT PROJECTS
WHEREAS, the San Pablo Avenue Multimodal Corridor Program is a central program to achieving the goals and strategies adopted in the 2020 Countywide Transportation Plan; and
WHEREAS, San Pablo Avenue is on the countywide High-injury Network and is identified in the City’s 2020 Vision Zero Action Plan as a high-injury street. San Pablo Avenue has the third highest incidence of injury collisions in Alameda County; and WHEREAS, promoting environmentally beneficial alternatives to driving, including bicycling, walking, and taking transit, supports the goals of the City’s Climate Action Plan and City’s Strategic Plan and may also lead to improved public health outcomes; and
WHEREAS, the San Pablo Avenue corridor is an Equity Priority Community and a Priority Development Area, which is planned for growth and increased density; improved multimodal options are needed to accommodate growth and better serve residents that may rely on alternatives to driving; and WHEREAS, in order to enhance safety for all travel modes and to improve comfort and quality of trips for all users, Alameda County Transportation Commission staff have developed conceptual designs for the Safety Enhancements Project and the Parallel Bike Improvements Project, and Staff have developed a conceptual design for the Addison Bike Boulevard Connector; and
WHEREAS, if this item is approved, Alameda County Transportation Commission would implement the Addison Street Bike Boulevard Connector as part of the Safety Enhancements Project.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the conceptual designs for the San Pablo Avenue Multimodal Corridor Program: Safety Enhancements and Parallel Bike Improvements projects and the Addison Street Bike Boulevard Connector within the City of Berkeley are approved; and BE IT FURTHER RESOLVED that the Council of the City of Berkeley authorizes the City Manager to direct Staff to partner with the Alameda County Transportation Commission on final design and implementation of these projects; and
2 BE IT FURTHER RESOLVED that the Council of the City of Berkeley authorizes the City Manager to direct staff to grant permits for construction activities within City right-of-way, contingent on City staff approval of final construction drawings and specifications from Alameda County Transportation Commission.
Memorandum
DATE: July 20, 2023
TO: Berkeley Transportation and Infrastructure Commission FROM: Matt Bomberg, Senior Transportation Engineer
Colin Dentel-Post, Principal Transportation Planner
SUBJECT: San Pablo Avenue Multimodal Corridor Program: Safety Enhancement and Parallel Bike Improvements Projects
Recommendation
It is recommended that the Transportation and Infrastructure Commission recommend that the Berkeley City Council:
1) Approve the conceptual design for the San Pablo Avenue Multimodal Corridor Program: Safety Enhancement and Parallel Bike Improvements Projects within the City of Berkeley
2) Direct City staff to partner with the Alameda County Transportation Commission (Alameda CTC) on final design and implementation of these projects.
Summary
Alameda CTC is leading the development of the San Pablo Avenue Multimodal Corridor Program, which consists of three projects to improve safety and multimodal access. The three projects were identified as part of a multi-year planning effort that began in 2017 and were approved by Alameda CTC’s Commission in March 2022. This TIC item concerns the Safety Enhancement and Parallel Bike Improvement projects, which are both partially within the City of Berkeley. Alameda CTC, in partnership with the City of Berkeley, other cities along the corridor, and AC Transit, has completed community engagement on the concept designs of the Safety Enhancement and Parallel Bike Improvements projects, including the parking and circulation implications of the projects.
Approval of the conceptual designs will provide Alameda CTC with firm direction on project scope to advance to subsequent project development phases. Following approval of the concept designs, the projects will proceed to environmental clearance, final design, and
construction. The Safety Enhancement Project also requires Caltrans approval through the Project Report process for the conceptual design.
Background
Alameda CTC is leading the San Pablo Avenue Multimodal Corridor Program, which is central to achieve the goals and strategies that were adopted in the 2020 Countywide Transportation Plan (CTP). San Pablo Avenue is on the countywide High-injury Network (HIN) and has the third highest incidence of injury collisions in Alameda County. There is an urgent need to improve safety for all users.1 San Pablo Avenue is also one of the streets with the highest bus ridership in the East Bay. However, due to congestion, buses are often slow and unreliable. The entire length of San Pablo Avenue within Alameda County is a Priority Development Area (PDA, or locally-nominated area for focused housing and job growth) and significant stretches are regionally-identified Equity Priority Communities (EPCs). With ongoing residential and commercial growth in the corridor, reliable, attractive bus service is critical to efficiently move more people.
The goals of the San Pablo Avenue Multimodal Corridor Program are to:
• Enhance safety for all travel modes
• Improve comfort and quality of trips for all users
• Support a strong local economy and efficiently accommodate growth along the corridor while respecting local contexts
• Promote equitable transportation and design solutions for diverse communities throughout corridor
San Pablo Avenue traverses four cities in northern Alameda County: Oakland, Emeryville, Berkeley and Albany. The State owns the right-of-way just north of I-580 (where San Pablo Avenue is designated as State Route 123), while the City of Oakland owns the right-of-way south of I-580. Caltrans is responsible for improvements on the State Highway System.
Alameda CTC and partner agencies initiated a robust planning process for San Pablo Avenue in 2017. Phase 1 of the project evaluated potential long-term concepts for the corridor in Alameda and Contra Costa Counties – including bus rapid transit and protected bike facilities – through extensive outreach and technical analysis. Phase 1 of the project entailed multiple rounds of engagement with the community, including residents, businesses, and community-based organizations, and garnered input from more than 4,900 individuals.
The Phase 1 Summary Report and materials are documented on the Project History tab of the project webpage: www.alamedactc.org/sanpablo. Due to the complex and constrained nature of the corridor every concept that was considered entailed notable trade-offs,
1 The Countywide High Injury Networks (HIN) were developed as part of the 2019 Countywide Active Transportation Plan and consists of focused portions of the countywide roadway network which account for an outsize share of severity - weighted crashes. The biking high injury network consists of 4% of street miles that saw 59% of bicycle -involved crashes and the pedestrian high injury network consists of 4% of street miles that saw 65% of pedestrian -involved crashes.
especially at intersections. At the end of Phase 1, there was not consensus around a single long-term vision to advance throughout the corridor.
At the conclusion of Phase 1, in March 2022, Alameda CTC’s Commission adopted an overall corridor concept which includes three projects within Alameda County. These projects differ between jurisdictions based on the local preferences and technical considerations and are intended to be near-term improvements which can be delivered within 3-5 years.
Collectively the three projects comprise the San Pablo Avenue Multimodal Corridor Program.
The projects are described in subsequent sections and include:
• Safety Enhancements Project (Berkeley and Albany)
• Parallel Bike Improvements Project (Berkeley, Albany, and North Oakland) • Bus and Bike Lane Project (Oakland, Emeryville, and South Berkeley) Safety Enhancement Project
The Safety Enhancements project extends along San Pablo Avenue from Oregon Street in South Berkeley to the Contra Costa County line in Albany. The project is focused on improving safety for pedestrians and bicyclists crossing San Pablo Avenue and targeted improvements to bus speed and reliability. This project is intended to target near-term safety enhancements and was developed with the intention of including priority improvements that can be implemented quickly to address the urgent safety needs on the corridor. The Safety Enhancements project seeks to avoid adjustments to curb lines in order to preserve longer- term design options along the corridor and minimize utility and drainage adjustments which would increase project cost and schedule. As such, bulbouts are generally only included at bus bulb locations and where needed to feasibly fit an ADA compliant curb ramp.
Specific project components include:
• High visibility crosswalks and striping
• Pedestrian signals (also called Pedestrian Hybrid Beacons (PHBs) or High-intensity Activated Crosswalk (HAWK) signals)
• Rectangular Rapid Flashing Beacons (RRFBs)
• Median refuges
• ADA compliant curb ramps
• Improved bicycle crossings of San Pablo Avenue at intersections with bike routes, particularly offset crossings of San Pablo Avenue
• Bus bulbs at AC Transit Rapid stops
• Bus stop relocations from nearside to farside of intersection • Sidewalk repair within bus stop areas
• Targeted lighting improvements at crosswalks and bus stops • Leading pedestrian intervals
• Accessible Pedestrian Signal (APS) upgrades
Attachment A provides more details on the improvements proposed at different project locations and the conceptual design of key project locations.
Parallel Bike Improvements Project
The Parallel Bike Improvements project seeks to provide all ages and abilities biking facilities along local streets parallel and leading to San Pablo Avenue in Albany, Berkeley, and North Oakland. The project takes advantage of the existing and planned bicycle boulevard/neighborhood bike route networks in these jurisdictions. Specific project elements include:
• Speed management traffic calming measures (traffic circles, speed tables) • Volume management traffic calming measures (diverters) • Improvements at bikeway crossings of major streets (arterial and collector streets) including PHBs/RRFBs, bulbouts, and median refuges
• Wayfinding improvements
Attachment A provides more details on the improvements proposed at different project locations and the conceptual design of key project locations.
Coordinated City of Berkeley Projects
The City of Berkeley has several funded projects that are being coordinated with the Safety Enhancement and Parallel Bike Improvement projects as described below:
• Addison Street Bicycle Boulevard – the project would implement bicycle boulevard improvements along Addison St between Aquatic Park and Sacramento Street and between Milvia Street and UC Berkeley Campus and has funding through the state Active Transportation Program. The project overlaps with Alameda CTC’s Safety Enhancements project at the intersection of San Pablo Ave/Addison St. The City of Berkeley has been selected to participated in a Complete Streets Leadership Academy which is being hosted by Caltrans and the National Complete Streets Leadership Academy. As part of its participation in the Leadership Academy, Berkeley will implement a quick build pilot on the state highway system. Berkeley will use the quick build pilot to test a concept design and receive stakeholder feedback on bike crossing improvements at San Pablo Ave and Addison St. This quick build is planned to be installed in Summer 2023. Following the conclusion of the quick build, the concept design will be incorporated as part of the Alameda CTC Safety Enhancements project. This will allow the location to obtain necessary Caltrans approvals and be designed and constructed along with the Alameda CTC project, which already involves Caltrans coordination.
• Parker Street to Addison Street Bikeway Project – project includes bicycle boulevard upgrades generally along Bonar St, Mabel St, and Parker St between Strawberry Creek Park/West St Pathway and San Pablo Park and has funding through the Affordable Housing and Sustainable Communities grant program. The project is being developed and implemented by the City of Berkeley separately from Alameda
CTC’s projects. The project will work in concert with Alameda CTC’s Parallel Bike Improvements project to create a complete north-south bicycle boulevard route along the east side of San Pablo Avenue.
• Ohlone Greenway Safety Improvements project – the project will improve existing sections and close gaps in the Ohlone Greenway between Virginia Gardens and Santa Fe Avenue. The project is being developed and implemented by the City of Berkeley separately from Alameda CTC’s projects. The project will work in concert with Alameda CTC’s Parallel Bike Improvements project to create a complete north- south cycling route along the east side of San Pablo Avenue.
Bus and Bike Lanes Project
The Bus and Bike Lanes Project will provide side-running bus lanes and protected bike lanes along San Pablo Avenue from Downtown Oakland (17th St) to Russell/Heinz in South Berkeley.
This project is not the subject of this TIC item; information is provided for background only.
Advancement of the currently scoped near-term project does not preclude additional multimodal improvements on San Pablo Avenue in Berkeley or Albany in the future.
Safety Enhancement and Parallel Bike Projects Community Engagement Alameda CTC, in partner with local jurisdictions and AC Transit, conducted engagement from December 2022 to May 2023 to seek input on the design details of the Safety Enhancement and Parallel Bike Improvements Projects. Engagement utilized a variety of methods, including:
• Direct outreach to storefronts along San Pablo Avenue • Mailers (two rounds)
• Interactive webmap and survey
• Bus stop flyers
• E-blasts to community groups
• Presentations to Alameda CTC Bicycle and Pedestrian Advisory Committee (BPAC) and San Pablo Active Transportation Working Group (ATWG) comprised of multimodal advocacy groups including representatives from Walk Bike Berkeley • Presentations to community groups including Berkeley Neighborhoods Council and Albany Chamber of Commerce
• In-person open house specifically on the Safety Enhancement and Parallel Bike Improvement Projects attended by more than 100 people
• Information including project open house boards and Frequently Asked Questions on project website
The attached outreach summary report (Attachment B) provides more details on the outreach methods utilized, materials, and level of feedback.
Project outreach generated more than 700 detailed comments on the Safety Enhancements and Parallel Bike Improvements Projects. The attached outreach summary report distills these
detailed comments down to a series of key themes and provides information on how the key themes have been considered.
In addition, based on the input from community engagement, a number of location-specific refinements were made to the concept designs. The Location-Specific Design Issues Technical Appendix provides more details on specific comments and design refinements made in response to public feedback. Examples of design changes made within the City of Berkeley in response to public feedback include changes to the parallel bike routing to avoid the complex intersection of Kains St/Cedar St/Hopkins St, additional crossing improvements at Kains St/Gilman St, addition of speed tables along parallel bike streets, and removing the diverter at 9th St/Pardee St due to conflicts with nearby delivery truck activity.
Schedule and Next Steps
Upon receipt of approval from key partner agencies, described above, Alameda CTC will advance the Safety Enhancement and Parallel Bike projects to subsequent project development phases, including obtaining necessary state and federal environmental clearance and developing final plans, specifications, and estimates. In addition, the Safety Enhancement project will require developing and gaining approval of a Caltrans Project Report, which is Caltrans’ formal approval of the project scope and design.
Alameda CTC has secured a combined $44 million in competitive grant funding from One Bay Area Grant, regional Active Transportation Program Cycle 6, and federal Safe Streets for All programs. These grant funds awarded $29 million for the Safety Enhancements project and $15 million for the Parallel Bike Improvements project and are programmed for the construction phase of the project. The project schedules are for the Parallel Bike Improvements project to be ready to advertise for construction by Spring 2024 and the Safety Enhancements project to be ready to advertise for construction by Fall 2024.
Attachments:
A) Concept Design Boards
• Overview Handout
• Map Boards
B) Outreach Summary Report
C) City of Berkeley Location-Specific Design Issues Technical Appendix D) Project Fact Sheets
• Safety Enhancements Project
• Parallel Bike Improvements Project
• Bus and Bike Lanes Project
Welcome to the Community Open House!
San Pablo Ave Safety Enhancements and Parallel Bike Improvements More Information
To learn more about these
efforts, please go to
www.alamedactc.org
/sanpablo.
Thank you for participating in today’s open house!
The Community Open House is an opportunity to discuss the roadway changes proposed to make walking and biking safer along the San Pablo Avenue Corridor in Albany, Berkeley and North Oakland.
Project Schedule
San Pablo Ave Safety Enhancement
Project
• Design/Environmental fi nalized by
Winter 2025
• Construction Spring 2025 - Winter
2026
Parallel Bike Improvement Project
• Design/Environmental fi nalized by
Spring 2024
• Construction Summer 2024 - Winter
2026
Project Background
Alameda CTC conducted an extensive planning process for the San Pablo Avenue corridor from 2017-2020 which included multiple phases of public outreach that reached nearly 5000 individuals. This effort led to the adoption of a corridor concept in March 2022 by the Alameda County Transportation Commission which includes three projects along San Pablo Avenue within Alameda County. Tonight’s open house covers two of the three projects.
The San Pablo Avenue Safety Enhancements Project will construct improvements to make it safer and easier to cross the street and make transit faster and more reliable along San Pablo Ave in Albany and Berkeley north of Heinz Ave. The project will maintain two traffi c lanes and most parking spaces along both sides of the street.
The Parallel Bike Improvement Project will construct bike safety and connectivity improvements along streets parallel to and across San Pablo Ave from 63rd Street in North Oakland through Berkeley and Albany. Together with improvements being led by local jurisdictions, this will result in a fully connected bicycle network along the corridor.
San Pablo Improvements to the South
The Bus and Bike Lanes Project, will construct bus and bike lanes as well as safety improvements from south of Heinz Avenue in Berkeley through Oakland and Emeryville.
The next phase of public engagement for that project will begin in Fall 2023.
Why is this Project Important?
San Pablo Avenue is a key multi-modal arterial street linking the cities of Oakland, Emeryville, Berkeley, and Albany in Alameda County.
San Pablo Ave is one of the streets with the most collisions and traffi c injuries in all of Alameda County, is one of AC Transit’s major corridors, is a Caltrans state highway route, and traverses regionally and locally identifi ed Equity Priority Communities and Priority Development Areas.
14th St
40th StAdeline St
San Pablo Ave
Cedar St
Hollis St
14th
Dwight Way
Telegraph Ave
12th St
27th
Spruce St
Ashby Ave
Marin Ave
Haste St
11th St
W Grand Ave
8th St
Martin Luther King Jr Way
Webster St
51st St
Arlington Ave
3rd St
Fulton St
Alcatraz Ave
Franklin St
Shattuck Ave
Powell St
20th St
College Ave
Central Ave
Macarthur Blvd
Durant Ave
5th St
Oak St
Oxford St
Stanford AveSolano Ave
Fairmount Ave
Key Route Blvd Madison St
Oakland Ave
Maritime St
Grizzly Peak Blvd Moraga Ave
Sutter St
The Alameda
Middle Harbor Rd
Peralta
Broadway Ter
Buchanan St
Pleasant Valley Ave
Claremont Ave
Santa Clara Ave
Macarthur
Lakeside
Gayley Rd
Shellmound St
Broadway
Adeline St
Gilman St
7th St
Telegraph Ave
8th St
Harrison StRose St
Martin Luther King Jr Way
Market St
University Ave
7th St
Lakeshore
Hearst Ave
Colusa Ave
Mandela Pkwy
Piedmont Ave
Grand Ave
Sacramento St
OaklandBerkeleyAlbany
Emeryville
24 13
§¨¦
80 §¨¦
580
§¨¦
80 §¨¦
580
§¨¦
580
§¨¦
80 §¨¦
580880
San Pablo Ave
San Pablo Avenue Safety Enhancements
Gilman St
University Ave
San Pablo Ave
San Pablo Ave
San Pablo Avenue Safety Enhancements
14th St
14th St
14th St
14th St
14th St
14th St
14th St
San Pablo Ave
12th St
San Pablo Ave
San Pablo Avenue Bus and Bike Lanes
Parallel Bike Improvements
Parallel Bike Improvements
San Pablo Avenue Safety Enhancements
Provide improvements that enhance safety for
vulnerable road users while not modifying roadway
allocation, such as pedestrian improvements, bicycle
crossing improvements, and targeted bus stop
improvements. Includes in-lane stops for Rapid buses.
San Pablo Avenue Bus and
Bike Lanes - EA# 2W290
Evaluate feasibility of dedicated bus
and bike lanes within Southern
Berkeley, Oakland, and Emeryville.
Parallel Bike Improvements
Enhance existing and planned bike
corridors in North Oakland, Berkeley,
and Albany to create a connected bike
network parallel to San Pablo Avenue.
0 1,500 3,000 Feet
San Pablo Avenue Multimodal Corridor Project
Phase 2 Project Elements
March 2023
Project Overview Map
Draft Proposals Subject to Approval by Cities and Caltrans
Welcome to the Community Open House!
San Pablo Ave Safety Enhancements and Parallel Bike Improvements Bicycle Network Improvements and Traffi c Calming
Improvements proposed largely along streets near San Pablo Ave to create a connected and comfortable bicycle network that provides an alternative route to San Pablo Ave and improves connections to businesses and residences. Also includes some improvements on San Pablo Ave.
Bicycle and Pedestrian Crossing
Improvements
Improvements focused on the safety of
crossings for pedestrians and cyclists at
existing and new street crossings. This
category includes:
Pedestrian/ Bicycle Crossing Beacons
Pedestrian Signals
Traffi c Signal Upgrades for Pedestrians
Median/ Pedestrian Refuge Island
Bulbout
New Pedestrian Crosswalks
Existing Crosswalk Removal
Improved Lighting
Diverter
Traffi c Circle
STOP Control Modifi cation
Yield Control Modifi cation
Speed Hump/Table
Vertical Separation for Bicycles
Bus Stop Improvements
Changes are proposed to bus stops to make the
transit service more effective and reliable, and to
improve pedestrian safety. This includes upgrading
and, in some cases relocating, existing stops and
limited stop removal.
New Bus Bulbs
Bus Stop Moved to Adjacent Location
New Bus Stop Location
Bus Stop Removed
Bus Stop Upgrades
Parking and Auto Circulation
Changes
The improvements discussed in the
other sections will contribute to
greater user safety and bus reliability.
In order to achieve those goals, some
modifi cations are needed to redirect
vehicles and change where on-street
parking is provided.
Turning Movement
Restriction/ Reassignment
Parking Removal
Associated Changes
At all locations with project
improvements identifi ed,
additional upgrades not
shown on the maps include:
• Curb Ramp Upgrades
• Improvements to Existing
Pedestrian Crosswalks
• Bike Pavement Markings
Alameda County Transportation Commission • 1111 Broadway, Suite 800 Oakland, CA 94607 • 510.208.7400 • www.AlamedaCTC.org Use your handout to help guide you through the benefi ts and defi nitions of the proposed improvements.
Diverter in Residential Neighborhood
Speed Table in Residential Neighborhood
Draft Proposals Subject to Approval by Cities and Caltrans
YIELD YIELD
Albany City Hall
Sprouts
Kains Ave
9th St
San Pablo Ave
Marin Ave
-7
-4
-3
-1
-1
-4 ([LVWLQJ3+%ZLWKDGGHG
F\FOLVWGHWHFWLRQ
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
Albany City Hall
Sprouts
San Pablo Ave
Marin Ave
-1
-1
-4 ([LVWLQJ3+%ZLWKDGGHG
F\FOLVWGHWHFWLRQ
Legend
Bus Improvements
Bus Stop Upgrade (Existing Location to
Remain)
Existing Bus Stop (To Remain)
Bus Stop Removed
Project Bike Route Improvements
Existing or Proposed Bike Route per City Bike
Plans
City of Berkeley Complete Streets Study
Corridor
%LF\FOH1HWZRUN,PSURYHPHQWVDQG7UDIÀF
Calming
([LVWLQJ7UDIÀF&LUFOH
1HZ7UDIÀF&LUFOH
Existing Stop Control (To Remain)
Existing Stop Control Removal
1HZ6WRS&RQWURO0RGLÀFDWLRQ
YIELD YIELD
1HZ<LHOG&RQWURO0RGLÀFDWLRQ
New Vertical Separation for Bicycles
Existing Speed Hump/ Table
New Speed Hump/ Table
(Note: Number and location of new speed humps/
WDEOHVVXEMHFWWRIXUWKHUUHÀQHPHQWGXULQJÀQDOGHVLJQ
Bicycle and Pedestrian Crossing Improvements
New Pedestrian/ Bicycle Crossing Beacon
New Pedestrian Signals
7UDIÀF6LJQDO8SJUDGHVIRU3HGHVWULDQV
New Median/Pedestrian Refuge Island
New Bulbout
New Pedestrian Crosswalk
Parking and Auto Circulation Changes
New Turning Movement Restriction/
Reassignment
Parking Removal
Segment 2: Gilman St to Cedar St
Future City of Albany
Intersection Bike
Improvement Project
Future UC Village
Jackson Street Bike
Gap Closure Project
San Pablo Ave and Marin Ave Intersection
Draft Proposal Subject to Cities and Caltrans Approval
ALBANY
Kains Ave and Marin Ave Intersection
&RQFHSWOD\RXWLVSUHOLPLQDU\DQGWREHUHÀQHGLQFRRUGLQDWLRQZLWK&LW\RI$OEDQ\ &RQFHSWOD\RXWLVSUHOLPLQDU\DQGWREHUHÀQHGLQFRRUGLQDWLRQZLWK&LW\RI$OEDQ\ 125 ft0 250 ft
October 2023
&RQFHSWOD\RXWLVSUHOLPLQDU\DQGWREHUHÀQHGLQFRRUGLQDWLRQZLWK&LW\RI$OEDQ\ &RQFHSWOD\RXWLVSUHOLPLQDU\DQGWREHUHÀQHGLQFRRUGLQDWLRQZLWK&LW\RI$OEDQ\ San Pablo Ave Safety Enhancements and Parallel Bike Improvements Berkeley Segment 1: Buchanan St to Harrison St
Acme Bread
Kains Ave
9th St
Camelia St
Stannage Ave
San Pablo Ave
Gilman St
Jones St
Page St ([LVWLQJ
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
-5 -7
-7
-5
-6
-2
-1
-8
-2
-3
-3
-1
-3
+1
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
Legend
Bus Improvements
Bus Stop Upgrade (Existing Location to
Remain)
Bus Stop Moved to Adjacent Location
New Bus Stop Location
New Bus Bulb
Project Bike Route Improvements
Existing or Proposed Bike Route per City Bike
Plans
City of Berkeley Complete Streets Study
Corridor
%LF\FOH1HWZRUN,PSURYHPHQWVDQG7UDIÀF
Calming
New Diverter
([LVWLQJ7UDIÀF&LUFOH
7UDIÀF&LUFOH8SJUDGH
1HZ7UDIÀF&LUFOH
Existing Stop Control (To Remain)
Existing Stop Control Removal
1HZ6WRS&RQWURO0RGLÀFDWLRQ
YIELD YIELD
1HZ<LHOG&RQWURO0RGLÀFDWLRQ
New Vertical Separation for Bicycles
Existing Speed Hump/ Table
New Speed Hump/ Table
(Note: Number and location of new speed humps/
WDEOHVVXEMHFWWRIXUWKHUUHÀQHPHQWGXULQJÀQDOGHVLJQ
Bicycle and Pedestrian Crossing Improvements
New Pedestrian/ Bicycle Crossing Beacon
New Pedestrian Signals
7UDIÀF6LJQDO8SJUDGHVIRU3HGHVWULDQV
New Median/Pedestrian Refuge Island
1HZ0HGLDQ0RGLÀFDWLRQ
New Bulbout
New Pedestrian Crosswalk
Existing Crosswalk Removal
Improved Lighting
Parking and Auto Circulation Changes
New Turning Movement Restriction/
Reassignment
Existing Turning Movement Restriction
Parking Removal
Parking Addition
San Pablo Ave and Jones St Intersection
See Segment 3: Virginia St to Allston Way
See Segment 1: Buchanan St to Harison St
Other
Improvements
Other
Improvements
Kains Ave and Gilman St Intersection
San Pablo Ave and Gilman St Intersection
Draft Proposal Subject to City of Berkeley and Caltrans Approval Current City of Berkeley
West of Gilman – Hopkins
Corridor Study
125 ft0 250 ft
October 2023
San Pablo Ave Safety Enhancements and Parallel Bike Improvements Berkeley Segment 2: Gilman St to Cedar St
Berkeley Adult
School
Public Library
San Pablo Ave
Delaware St
YIELD YIELD
YIELD YIELD
YIELD YIELD
-3
-5
+3
-7
-3
-1 -2
2ULHQWDWLRQRIH[LVWLQJ
GLYHUWHUWRFKDQJH
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
Legend
Bus Improvements
Bus Stop Upgrade (Existing Location to
Remain)
Bus Stop Moved to Adjacent Location
New Bus Stop Location
New Bus Bulb
Project Bike Route Improvements
Existing or Proposed Bike Route per City Bike
Plans
City of Berkeley Complete Streets Study
Corridor
%LF\FOH1HWZRUN,PSURYHPHQWVDQG7UDIÀF
Calming
New Diverter
([LVWLQJ7UDIÀF&LUFOH
7UDIÀF&LUFOH8SJUDGH
1HZ7UDIÀF&LUFOH
Existing Stop Control (To Remain)
Existing Stop Control Removal
YIELD YIELD
1HZ<LHOG&RQWURO0RGLÀFDWLRQ
Existing Speed Hump/ Table
New Speed Hump/ Table
(Note: Number and location of new speed humps/
WDEOHVVXEMHFWWRIXUWKHUUHÀQHPHQWGXULQJÀQDOGHVLJQ
Bicycle and Pedestrian Crossing Improvements
7UDIÀF6LJQDO8SJUDGHVIRU3HGHVWULDQV
New Median/Pedestrian Refuge Island
Improved Lighting
Parking and Auto Circulation Changes
New Turning Movement Restriction/
Reassignment
Parking Removal
Parking Addition
See Segment 4: Bancroft Way toCarleton St
See Segment 2: Gilman St to Cedar St
Other
Improvements
Other
Improvements
Future City of Berkeley
Addison Street Bicycle
Boulevard Project
West Street Pathway
Connects with Ohlone
Greenway to the north
Future City of Berkeley
Parker-Addison Mobility and
Safety Improvement Project
Draft Proposal Subject to City of Berkeley and Caltrans Approval Virginia St and San Pablo Ave Intersection
San Pablo Ave and University Ave Intersection
125 ft0 250 ft
October 2023
San Pablo Ave Safety Enhancements and Parallel Bike Improvements Berkeley Segment 3: Virginia St to Allston Way
San Pablo Ave
Parker S
t
Dwigh
t Wa
y
Carleton St
-7
+3
-3
-7
+3 -2
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
+2
Legend
Bus Improvements
Existing Bus Stop (To Remain)
Bus Stop Removed
Bus Stop Moved to Adjacent Location
New Bus Stop Location
New Bus Bulb
Existing or Proposed Bike Route per City Bike
Plans
City of Berkeley Complete Streets Study
Corridor
%LF\FOH1HWZRUN,PSURYHPHQWVDQG7UDIÀF
Calming
Existing Diverter
New Diverter
([LVWLQJ7UDIÀF&LUFOH
7UDIÀF&LUFOH8SJUDGH
Existing Stop Control Removal
1HZ6WRS&RQWURO0RGLÀFDWLRQ
YIELD YIELD
1HZ<LHOG&RQWURO0RGLÀFDWLRQ
Existing Speed Hump/ Table
New Speed Hump/ Table
(Note: Number and location of new speed humps/
WDEOHVVXEMHFWWRIXUWKHUUHÀQHPHQWGXULQJÀQDOGHVLJQ
Bicycle and Pedestrian Crossing Improvements
New Pedestrian/ Bicycle Crossing Beacon
New Pedestrian Signals
New Median/Pedestrian Refuge Island
New Pedestrian Crosswalk
Existing Crosswalk Removal
Parking and Auto Circulation Changes
New Turning Movement Restriction/
Reassignment
Parking Removal
Parking Addition
Channing Way and San Pablo Ave Intersection
See Segment 5:Derby St to Carrison St
See Segment 3: Virginia St to Allston Way
Other
Improvements
Carleton St and San Pablo Ave Intersection
Future City of Berkeley Parker-
Addison Mobility and Safety
Improvements Project
Draft Proposal Subject to City of Berkeley and Caltrans Approval Blake St and San Pablo Ave
Dwight Way and San Pablo Ave Intersection
125 ft0 250 ft
October 2023
San Pablo Ave Safety Enhancements and Parallel Bike Improvements Berkeley Segment 4: Bancroft Way to Carleton St
Mabel St
Mabel St
San Pablo Ave
Carleton St
Carrison S
t
Ashby Ave
Pardee
St
-6
-3
-2
-3
-2
-7
-4
-4
-6 -3 -6
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
Legend
Bus Improvements
Bus Stop Upgrade (Existing Location to
Remain)
Existing Bus Stop (To Remain)
Bus Stop Moved to Adjacent Location
New Bus Stop Location
Project Bike Route Improvements
Existing or Proposed Bike Route per City Bike
Plans
City of Berkeley Complete Streets Study
Corridor
%LF\FOH1HWZRUN,PSURYHPHQWVDQG7UDIÀF
Calming
Existing Diverter
([LVWLQJ7UDIÀF&LUFOH
7UDIÀF&LUFOH8SJUDGH
1HZ7UDIÀF&LUFOH
Existing Stop Control (To Remain)
Existing Stop Control Removal
1HZ6WRS&RQWURO0RGLÀFDWLRQ
YIELD YIELD
1HZ<LHOG&RQWURO0RGLÀFDWLRQ
Existing Speed Hump/ Table
New Speed Hump/ Table
(Note: Number and location of new speed humps/
WDEOHVVXEMHFWWRIXUWKHUUHÀQHPHQWGXULQJÀQDOGHVLJQ
Bicycle and Pedestrian Crossing Improvements
7UDIÀF6LJQDO8SJUDGHVIRU3HGHVWULDQV
New Median/Pedestrian Refuge Island
New Bulbout
New Pedestrian Crosswalk
Existing Crosswalk Removal
Parking and Auto Circulation Changes
New Turning Movement Restriction/
Reassignment
Parking Removal
Pardee Ave and San Pablo Ave Intersection
30'
See Segment 6: Haskell St to 63rd St
See Segment 4: Bancroft Way to Carleton St
Other
Improvements
Other
Improvements
Russell St and Mabel St Intersection
Future City of Berkeley
Parker-Addison Mobility and
Safety Improvement Project
Draft Proposal Subject to City of Berkeley and Caltrans Approval 125 ft0 250 ft
October 2023
San Pablo Ave Safety Enhancements and Parallel Bike Improvements Berkeley Segment 5: Derby St to Carrison St
Mabel St
Idaho St
65th St
63r
d S
t
San Pablo Ave
65th S
t
63rd S
t
Pea
body
Ln
64th
St
Ocea
n Ave
67th St
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
YIELD YIELD
-5
-4
-3
-4
-7
-3
-6 -6
65th St65th St65th St
ttSS
hhhtt55666666
tt
66 666
666
636363
333
33r3r
dS td Std St
San Pablo Ave
66666666
SSS
hS
5th S5th S
SS
hhtt55
ttttt
tttt
ttt
6 3
r
d S
t
P
ea
body
Ln
64th
St
O
cea
n Ave
67th St
YIELDYIELDYIELD
YIELDYIELDYIELD
YIELDYIELDYIELD
YIELDYIELDYIELD
YIELDYIELDYIELD
YIELDYIELDYIELD
YIELDYIELDYIELD
-4
-7
-3
Legend
Project Bike Route Improvements
Existing or Proposed Bike Route per City Bike
Plans
City of Berkeley Complete Streets Study
Corridor
%LF\FOH1HWZRUN,PSURYHPHQWVDQG7UDIÀF
Calming
([LVWLQJ7UDIÀF&LUFOH
1HZ7UDIÀF&LUFOH
Existing Stop Control (To Remain)
Existing Stop Control Removal
1HZ6WRS&RQWURO0RGLÀFDWLRQ
YIELD YIELD
1HZ<LHOG&RQWURO0RGLÀFDWLRQ
New Vertical Separation for Bicycles
Existing Speed Hump/ Table
New Speed Hump/ Table
(Note: Number and location of new speed humps/
WDEOHVVXEMHFWWRIXUWKHUUHÀQHPHQWGXULQJÀQDOGHVLJQ
Bicycle and Pedestrian Crossing Improvements
New Bulbout
New Pedestrian/ Bicycle Crossing Beacon
New Median/Pedestrian Refuge Island
New Pedestrian Crosswalk
Parking and Auto Circulation Changes
Parking Removal
63rd at Market Street Intersection
San Pablo Ave
65th S
t
Pea
body
Ln
Ocean
Ave
Emeryville Greenway
San Pablo Ave
66666666
SSS
h S
5th S5th S
SS
hhtt55
ttttt
tttt
ttt
P
ea
body
Ln
O
cean
Ave
Emeryville Gre
enway
San Pablo Ave to Oakland City Limit
See inset map for
improvements further
west on 65th Street.
tt
ttttt
See Segment 5: Derby St to Carrison St
Other
Improvements
Draft Proposal Subject to Cities and Caltrans Approval
OAKLAND
EMERYVILLE
125 ft0 250 ft
October 2023
San Pablo Ave Safety Enhancements and Parallel Bike Improvements Berkeley Segment 6: Haskell St to 63rd St
San Pablo Avenue Safety Enhancements and Parallel Bike Improvements 2022-2023 Outreach Summary
1. History of outreach on SPA Corridor
San Pablo Avenue is a key multimodal arterial street linking the cities of Oakland, Emeryville, Berkeley, and Albany in Alameda County. It is one of the streets with the most collisions and traffic injuries in all of Alameda County, is one of AC Transit’s major corridors, is a Caltrans state highway route, and traverses regionally and locally identified Equity Priority Communities and Priority Development Areas.
Since 2017, Alameda CTC has worked with cities, AC Transit, Caltrans and thousands of storefronts, residents and others who rely on the San Pablo Avenue Corridor. Phase 1 of this outreach effort, which ended in 2020, evaluated a wide variety of configurations for San Pablo Avenue, exploring what transportation modes could be accommodated within the limited right- of-way and trade-offs between different concepts.
That in-depth public engagement process revealed that participants placed the highest priorities on making walking safer and the bus more reliable. There was also widespread support for safer bike facilities either on San Pablo Avenue or on nearby bike routes. The greatest support for significant changes to San Pablo Avenue was in Oakland and Emeryville, especially for a bus lane to make bus service faster and more reliable.
By the conclusion of Phase 1 of the San Pablo Avenue Corridor project in 2020, decision- makers in Alameda County determined that the project would eventually include safety enhancements for pedestrians throughout the corridor, dedicated bus lanes and bike lanes in Oakland and Emeryville, and improvements to nearby parallel bike routes in Berkeley and Albany.
1 This project scope was formally adopted by Alameda CTC’s Commission in March of 2022.
2. Purpose of this round of outreach
Phase 2 of San Pablo Avenue Corridor project outreach consists of sharing and getting input on the conceptual design details of proposed improvements. Phase 2 outreach is being undertaken in two rounds, with the first round focused on Safety Enhancements and Parallel Bike improvements in Berkeley, Albany, and North Oakland and the second round to focus on Bus and Bike Lane improvements to the south. The first round of Phase 2 of the San Pablo Avenue Corridor outreach process was in 2022-2023. Key stakeholders in this round of outreach included storefronts along San Pablo Avenue, nearby residents, bus-riders and others who travel in the corridor.
1 Note that none of these geographies are exact; the Bus and Bike Lane project and parallel bikeways extend slightly into adjacent cities in order to end at logical locations.
3. Outreach activities
Project team-members organized, publicized and participated in several activities and gatherings to discuss proposed safety enhancements and parallel bike improvements with stakeholders along the corridor, as follows. Please see Appendix A for notes of these activities:
● Storefronts: Proposed safety enhancements on San Pablo Avenue will remove and, in some cases add, on-street parking in front of 62 businesses in Albany and Berkeley. During the weeks of December 5 and 12, 2022, Alameda CTC and consultant staff visited each of these storefronts in person, shared plans of the proposed changes and recorded responses. Additional follow-up with businesses was conducted via phone. Sixteen businesses objected to proposed parking losses, and these businesses were contacted to inform them of decisions regarding their objections.
● Berkeley Neighborhood Council (BNC): According to the BNC website, the organization is dedicated to improving the quality of life for all by creating a unified neighborhood voice for promoting livability and resolving problems. On Jan. 14, 2023, Alameda CTC staff met virtually with approximately 20 members of this group.
Questions included impacts to trees and emergency access. Appendix A contains notes of the meeting and the online chat interchange.
● Alameda CTC Active Transportation Working Group (ATWG): The ATWG includes representatives of walk and bike advocacy groups from throughout Alameda County and is a forum to discuss issues that affect active transportation in the county, including projects like the San Pablo Avenue Corridor project. On Jan. 25, 2023, this project was presented to nine ATWG members, including representatives of Albany Strollers & Rollers, Walk Bike Berkeley and Bike East Bay. Comments about the Safety Enhancements/Parallel Bike Improvements project in Albany and Berkeley included suggesting temporary barriers at daylit curbs, raised crosswalks (none on SPA to avoid interfering with emergency vehicles) and bulbouts on SPA (not included to avoid conflicting with potential for future bike lanes). ● Alameda CTC Bicycle and Pedestrian Advisory Committee (BPAC): This group advises Alameda CTC on projects that affect bicycle and pedestrian transportation being planned throughout Alameda County. All ten BPAC members participated in the February 9, 2023 meeting. Comments about the project included support for designing median closures to allow emergency access, a request for automatic detection of bikes at pedestrian-activated signals because push-buttons are often difficult for cyclists to reach, and a suggestion that the Brighton/Clay separated bike lanes be at sidewalk level consistent with the existing similar facility farther south on SPA.
● Albany Chamber of Commerce: This is a group of businesses in Albany, including many on San Pablo Avenue. On Mar. 1, 2023, Alameda CTC staff discussed the project with 30-40 members of this business group at the Solano Oriental Rug Gallery. Most comments and questions were about changes to bus stops that could reduce on-street parking and places used for informal loading. General concerns about losing on-street parking were also expressed. Staff cleared up confusion that a
lane of traffic would be replaced with a dedicated bus lane, as is proposed in Oakland in Emeryville.
● Open house: On Mar. 30, 2023, Alameda CTC hosted a two-hour open house at the Berkeley Adult School on San Pablo Avenue in Berkeley. At this gathering, approximately 100 participants viewed two welcome/overview boards and maps of the corridor through Albany and Berkeley divided into seven zoomed-in boards. Alameda CTC and consultant staff transcribed verbal comments, and participants affixed 234 sticky notes to specific map locations.
4. Communication materials
A variety of materials were developed to communicate plans for San Pablo Avenue and parallel routes in Albany and Berkeley, including the following (see Appendix B):
● Mailer sent to 8,588 households and properties that informed recipients of the projects, directed them to a project website and interactive map (described below), and provided information on how to provide feedback. Mailing radii were based on the City of Berkeley’s Public Works Public Engagement Policy (2021). ● Email communicating the same information as the mailer, sent to stakeholders by Alameda CTC, City Council members in Albany and Berkeley and AC Transit ● Flyer left at storefronts that were closed or where no one was available to talk ● Flyers posted at every San Pablo Avenue bus stop in Albany and Berkeley ● Mailer publicizing the Mar. 30, 2023 open house sent to 4.032 households near proposed improvements that alter traffic circulation
● Simplified/non-technical boards showing all planned improvements in Albany and Berkeley and handout explaining the icons used on the boards
5. Feedback tools
Input on the planned safety enhancements and parallel bike improvements was gathered using several mechanisms, including:
● In-person survey of storefront owners and managers
● Online interactive map survey
● Notes of in-person meetings
● Physical sticky notes on project boards
● Chat and recordings of virtual meetings
6. Key themes
The project team received a wide range of input across the various outreach activities, including both general and location-specific comments, input, and concerns. Table 1 below summarizes key themes related to the Safety Enhancements and Parallel Bike projects that emerged across this breadth of feedback. The table also provides information on considerations and actions taken (or to be taken) based on each theme.
The project team also received comments related to other parts of the San Pablo Avenue corridor and other ongoing projects. Table 2 summarizes key themes and considerations related to other comments.
A companion Location-Specific Design Issues Technical Appendix document provides further details on comments and design refinements made at specific locations.
Table 1: Safety Enhancements and Parallel Bike Comments Comment Theme Considerations/Action Taken
Suggestions for changes to routing of parallel bike
improvements (e.g. Kains vs Stannage vs Cornell,
Idaho vs. Herzog, 10th vs 9th); concerns about
legibility/ directness of parallel routes east of San
Pablo
The parallel bike project streets/routing are based on City’s adopted Bicycle Master Plans and prior coordination with City staff and public engagement and analysis from Phase 1,
including review by a project Active Transportation Working Group comprised of multimodal transportation advocacy
organizations. Routing was revised in several locations based on feedback and coordination with cities (and cities will incorporate revised routing in future Bike Plan updates).
Suggestions for changes to bikeway facility type
along parallel routes (e.g. Class II bike lane vs.
Class III bike route)
The parallel bike project streets/routing are based on City’s adopted Bicycle Master Plans and prior coordination with City staff.
Comments related to level of traffic control device at
bike crossings of major/busy streets (e.g.
Kains/Marin, Kains/Gilman). Concerns regarding
adequacy of flashing beacons at multi-lane
crossings, requests to replace RRFBs with PHBs.
Level of traffic control device revised (from RRFB to PHB) and/or additional crossing treatment measures (bulbouts) added at several locations
Suggestions to add more stop-control changes and
speed humps to parallel bike streets, to minimize
need for cyclists to stop and slow traffic
Stop-control changes and speed humps were included (or
not included) in accordance with local design
guidelines/adopted policies and design direction from local jurisdiction staff.
Suggestions for signal operations changes
(pedestrian recall (no “beg buttons), timing,
detection issues)
Suggestions/comments related to signal operations have
been shared with cities who operate the signals. At signals to be modified by Alameda CTC, bike detection and signal
timing/phasing will be implemented in accordance with the agency responsible for signal operations.
Suggestions for additional improvements at other
locations that are not along project streets (e.g. San
Pablo/Curtis crossing, Gilman/10
th Crossing, Cerrito
Creek bridge)
These suggestions are outside of the geographic scope of Alameda CTC’s projects and have been forwarded to the
applicable city. In some cases, they overlap with ongoing City projects.
Comments related to ensuring designs are
accommodating to people in wheelchairs, mobility
devices, and with other disabilities
Design will be in accordance with all applicable laws and codes related to universal design. Project elements such as median refuges, ADA ramp upgrades, and Accessible
Pedestrian Signals will improve access for these users.
Concerns regarding traffic redistribution from local
circulation changes (diverters, median closures)
Streets proposed for diverters and median closures are low- volume residential streets so the amount of traffic that would use other routes is low.
Location-specific concerns related to parking
changes from bus stop relocation and lengthening
and new bus stop locations
Considered and incorporated as part of Design Changes
listed below. Some bus bulbs shortened to balance
lengthening of bus stops with business parking needs. Some stop relocations at signalized intersections not pursued based on existing side street parking prohibitions and
driveway constraints siting new farside bus stops.
Location-specific concerns related to crossing
designs (e.g. San Pablo/Washington)
Considered and incorporated as part of Design Issues
Technical Appendix
Location-specific concerns related to vehicular
routing from diverters/median closures (e.g.
Pardee/9th)
Considered and incorporated as part of Design Issues
Technical Appendix.
Concerns regarding bus stop nuisance issues
(trash, crime).
Project will explore replacing Rapid stop shelters with more open, canopy style shelter that promotes better visibility.
Potential for trash receptacles to be discussed with cities during final design. When raised as an objection to a
proposed bus stop relocation was not considered a reason not to pursue relocation.
Suggestions related to striping, materials,
landscaping, ease of detection of cyclists, and other
design details
Will be considered as part of detailed design
Table 2: Other Comments
Comment Theme Considerations/Action Taken
Support and opposition for extending Bus/Bike
Lanes through the entirety of Berkeley and Albany
The San Pablo Avenue Corridor Concept approved by
Alameda CTC’s Commission in March 2022 calls for bus and bike lanes only in Oakland, Emeryville, and South Berkeley south of Russell/Heinz.
Comments and concerns related to San Pablo
Avenue south of Russell/Heinz (Bus/Bike
improvements)
Comments will be revisited as part of Bus/Bike project
outreach in late 2023.
Comments indicating misconception that traffic and
parking lanes would be removed throughout
Berkeley/Albany, including concerns related to
additional traffic from development, San Pablo
Avenue’s function as a reliever route, emergency
evacuations, and business impacts
Comments generally related to removal of traffic and parking lanes, which are not proposed as part of the Safety
Enhancements or Parallel Bike projects.
Comments related to other ongoing City projects
(Hopkins St separated bike lanes, Parker-Addison
Safety and Mobility Project, Addison St Bike
Boulevard, Kains-Adams Bike Boulevard pilot)
Shared with City staff
7. Appendi
ces
Project mailers (attached)
Storefront outreach flyer (attached)
Bus stop flyer (attached)
Online interactive map and survey screen captures (attached) Open House boards and handouts (available online at www .alamedactc.org/sanpablo under
Key Materials tab)
San Pablo Avenue Corridor Projects
Safety Enhancements & Parallel Bike Improvements
San Pablo Ave. has the third
highest number of collisions
in Alameda County and is
the second-busiest bus
corridor in the County.
Enhancements to make the street safer
and easier to cross for people walking,
biking, and taking the bus, bus stop
improvements, and upgraded routes for
bikes on parallel streets are coming soon!
Project Map
For more info:
[email protected]
510-208-7400
Si necesita esta información en
un formato diferente, llame al
(510) 208-7400 o envíe un email
a [email protected].
త৴ଉɼ கి
(510) 208-7400 ࢸ݅
[email protected].
Bicycle Intersection Improvements
Bicycle Route Improvements
Existing Parallel Bicycle Network
• Pedestrian and bicycle
crossing improvements
• Bus stop upgrades and
relocations
• Parallel street improvements,
calm traffic and to make biking
safer and more comfortable
The project includes:
Go to WWW.ALAMEDACTC.ORG/SANPABLO
to see what’s planned for your block and
provide input on proposed improvements!
Alameda County Transportation Commission
1111 Broadway, Suite 800
Oakland, CA 94607
San Pablo Avenue Safety Enhancements & Parallel Bike Improvements Community Open House Announcement
San Pablo Ave. has the third highest
number of collisions in Alameda County
and is the second-busiest bus corridor in
the County.
Proposed enhancements will make the street safer and easier to cross for people walking, biking, and taking the bus, improve bus stops, and upgrade routes for bikes on parallel streets. In specific locations, the improvements will change traffic routes and remove parking. Preliminary design plans are ready for your review and comment! Project Map
For more info:
[email protected]
510 -208 -740 0
Si necesita esta información en un formato
diferente, llame al (510) 208-7400 ó envíe
un email a [email protected].
త৴ଉɼ கి(510)
208-7400 ࢸ݅
[email protected].
Herzog St
Bus and Bike Lanes Project
To Downtown
Oakland
San Pablo Ave
Public outreach coming
mid-2023
80 580
Ohlone Greenway
6th St
Marin Ave
University Ave
Hearst Ave
Buchanan St
Solano Ave
Gilman St
Berkeley
Albany
Cedar St
Hopkins St Ashby Ave
7th St
Virginia St
9th St
Kains Ave
Channing Way Heinz Ave
Mabel StWest St Bonar St
West St
Camelia StHarrison St
Jackson St
Brighton Ave
Adams St
Addision St
North Berkeley
Station
California St
65th St
Idaho St 63rd St
9th St10th St
66th St
Alcatraz Ave
Sacramento St
Cedar St
Delaware St Blake St
Pardee St
Grayson St
Ward St Russell St
Clay St
Jones St
Washington Ave
Safety Enhancements Project
San Pablo Avenue Multimodal Corridor Project
March 2023
Existing or Proposed Bike
Route per City Plans
Parallel Bike Improvements
0 1000 ft 2000 ft
Traffic Circulation Change Location
Community
Open House
March 30, 2023
at Berkeley
Adult School
We want to
hear from you!
See reverse for
info & online
commenting
opportunities.
Bicycle Improvements
Existing or Proposed Bike Route
per City Bike Plans
Traffic Restriction Location
Addressing & Postal Barcode
4.5” x 2.0”
1.25” x 1.25”
stamp area
Project Improvements Include:
Go to WWW.ALAMEDACTC.ORG/SANPABLO to see what’s planned for your block and provide input on proposed improvements!
Alameda County Transportation Commission
1111 Broadway, Suite 800
Oakland, CA 94607
You’re Invited to an In-Person Open House!
Please come to a community open house to discuss
roadway changes proposed to make it safer to walk and
bike in the San Pablo Avenue corridor. This event is open to the public.
Traffic Diverter on Residential
Streets: Restricts through auto
passage to calm traffic on bike
boulevards.
Median Closure: Restricts
left-turns to provide improved
crossings for bicycles and
pedestrians.
Bus Stop Improvements:
Relocates and improves bus stops
to make the bus more reliable
and safer to access.
Crosswalk Improvements:
Provides signals and flashing lights
at crosswalks to improve safety.
Other improvements include
enhanced lighting at crosswalks,
traffic circles to slow traffic and
curb ramps to increase
accessibility.
Median Closure
Traffic Diverter
Pedestrian Signal
When:
Thursday,
March 30, 2023
6:00 pm - 8:00 pm
Where:
Berkeley Adult School
1701 San Pablo Ave
Between Virginia and Francisco
Streets. (Enter through San Pablo
Ave. or Curtis St. parking lots.)
San Pablo Avenue Corridor Safety Enhancements
Storefront Outreach - Project Overview
Alameda County Transportation Commission • 1111 Broadway, Suite 800 Oakland, CA 94607 • 510.208.7400 • www.AlamedaCTC.org December 2022
Need for Project
• San Pablo Ave. has one of the highest incidents of injury collisions in Alameda County. We need to improve safety for all users, and especially the most vulnerable: people walking and biking, seniors, and children.
• San Pablo Ave. serves as a main commercial street for many diverse communities. The local economy and growth along the corridor need a street that supports a range of transportation choices. • San Pablo Ave. is one of the highest-ridership bus corridors in the East Bay. However, due to congestion, buses are often slow and unreliable because they are stuck in traffi c.
Reliable, attractive bus
service is critical to effi ciently move more people, while minimizing environmental impacts.
Virginia St
2nd St
5th St
4th St
Kains Ave
10th St
9th St
Delaware St
Cornell AveTalbot Ave
3rd St
Stannage Ave Evelyn Ave
Pierce St
Page St
Jones St
Adams St
Carmel Ave
Curtis St
Peralta Ave
Jackson St
Madison St
Harrison St
Liberty St
Cleveland Ave
Masonic Ave
Cerrito St
West St
Ada St
Brighton Ave
Franklin St
Taft Ave
Polk St
Behrens St
Spokane Ave
Dartmouth St
Washington Ave
C St
Garfield Ave
Lassen St
Berkeley Way
Yosemite Ave
San Diego St
Northside Ave
Ohlone Ave
Belmont Ave
San Gabriel Ave
Hillside Ave
Short St
B St
Castro St
Monroe St
Taylor St
Clay St
Belvedere Ave
Fillmore St
Gateview Ave
Keoncrest Dr
Victoria St
A St
Johnson St
Juanita Way
Bataan Ave
Cedarwood Ln
Virginia Gardens
Bolivar Dr
Washington Ave
Cornell Ave
Masonic Ave
Short St
Jackson St
Lincoln St
Francisco St
Adams St
Curtis St Delaware St
3rd St
Neilson St
Rose St
Santa Fe Ave
Santa Fe Ave
Curtis St
Neilson St
Short St
Portland Ave
5th St4th St
Peralta Ave
Carlson Blvd
Plaza Loop Road
67th St
61st St
9th St
Russell St
Derby St
8th St
Acton StMabel St
10th St
Carleton St
Heinz Ave
Dohr St
Harmon St
Potter St
Park St
Oregon St
Haskell St
Fairview St
Burnett St
Tyler St
Carrison St
Pardee St
Julia St
Wallace St
61st Pl
Bolivar Dr
Peabody Ln
Boise St
Overland Ave
Oregon St
67th St
Ward St
Stanton St
Acton StMabel St
Carleton St
66th St
62nd St
Potter St
Herzog St
Russell St
65th St
Liquid Sugar Dr
Murray St
65th St
8th St
4th St
4th St
5th St
Parker St
Blake St
Derby St
Kains Ave
Acton St
9th St
Curtis St
Carleton St
Cornell Ave
Hearst Ave
Ward St
61st St
Page St
Stannage Ave
Talbot Ave
Bancroft Way
Ordway St
62nd St
66th St
64th St
63rd St
Bonar St
Camelia St
Harrison St
Vallejo St
Baker St
Grayson St
Mathews St
Chestnut St
Browning St
Posen Ave
Pierce St
Byron St
Lowell St
Valley St
Idaho St
Edwards St
Anthony St
61st Pl
Cleveland Ave
Dwight Way
Tevlin St
Cutter Way
Gooding Dr
Francis St
Kinkhead Way
Chaucer St
Liberty Ship Way
Acton Cres
Cowper St
Park Way
Poe St
Occidental St
N Valley St
Acroft Ct
Helen Ct
Terrace St
Sojourner Truth Ct
Albany Ter
Addison St
Pomona Ave
Carmel Ave
California St
5th St
62nd St
64th St
Doyle St
66th St
West St
Ramona Ave
Addison St
Bay St
63rd St
Alcatraz Ave
Alcatraz
Bancroft Way
63rd St
Bolivar Dr
Acton St
Stannage Ave
Cornell AveTalbot Ave
Stuart St
Allston Way
9th St
Allston Way
2nd St
4th St
7th St
Channing Way
8th St
10th St
7th St
West St
Ohlone Greenway
Albany Hill
Park
Ocean
View
Park
67th St
Liquid Sugar Dr
65th St
66th St
Emeryville Greenway
Masonic Ave
Pomona Ave
Ohlone Greenway
Victoria St
Plaza Loop Road
Ohlone Greenway
San Francisco Bay Trail
Cerrito St
Ohlone Ave
Fillmore St
Pierce St
Ocean View Bikeway
Kinkhead Way
Kinkhead Way
Liberty Ship Way
Liberty Ship Way
Ocean
View
Lower Cordonices Path
6th St
Marin Ave
San Pablo Ave
University Ave
Fairmount Ave
Key Route Blvd
Buchanan St
Ashbury Ave
Solano Ave
Eastshore Hwy
Gilman St
Berkeley
Oakland
Emeryville
Albany
Cedar Ave
Hopkins St
Ashby Ave
7th St
We Want to Hear From You!
We’re doing outreach to storefronts where planned safety and bus improvements will affect curb space to discuss the project and better understand your loading, parking, and access needs. Please contact us at: [email protected] | (510) 208-7400 Pedestrian Safety Improvements
Safety treatments for pedestrian crossings will improve visibility and reduce speeding along San Pablo Ave.
Pedestrian Refuges will provide space in the center median for pedestrians to wait to safely cross the second half of the street, while High Visibility Pavement Markings will make crossings more visible to drivers. Additional crosswalk signals and beacons will increase the number of drivers that stop for people crossing the street.
Pedestrian Hybrid Beacons are
traffi c signals that pedestrians
or bicyclists activate to turn the
signal red for motorists.
Project Map
Legend
New Bus Bulb (Existing
Rapid Stop)
New Bus Stop Location Bus Stop Removed
Bus Stop Moved to
Adjacent Location
Existing Bus Stop
(To Remain)
Pedestrian/ Bicycle
Crossing Improvements
Rectangular Rapid Flashing
Beacons are fl ashing lights that
warn drivers when pedestrians
are in the crosswalk.
San Pablo Avenue Corridor Safety Enhancements
Storefront Outreach - Project Improvements
Alameda County Transportation Commission • 1111 Broadway, Suite 800 Oakland, CA 94607 • 510.208.7400 • www.AlamedaCTC.org December 2022
Reduce Bus Travel Time and Enhance
Reliability
The project proposes improvements that improve bus speed, reliability, convenience and safety for all users along San Pablo Ave. Bus stop improvements include:
Bus Bulbs Improve Transit
and Sidewalk Space
Bus bulbs increase sidewalk space for
pedestrians, providing room for a bus
shelter and other stop facilities, while
increasing sidewalk space for people
walking, outdoor seating, or other
space for adjacent businesses. The bulb
out brings the curb into the street and
shortens pedestrian crossing distances.
Changes to Parking & Loading
At locations with relocated or new bus stops, Pedestrian Hybrid Beacons, and/or offset bicycle crossings, some parking and loading spaces will be relocated or removed. New red curbs in advance of pedestrian crossings will improve the overall visibility, which results in some parking loss.
New space for parking and loading can result when relocating bus stops from the near side to the far-side of the intersection. Bus stop relocations in combination with crosswalk and bicycle improvements will increase pedestrian safety, benefi ting customers and everyone else in the community.
Off-Set Bicycle
Crossing
At two locations within
the project area, bicycle
boulevards cross San Pablo
Ave. at offset intersections.
The proposed improvements
provide safer, protected
bikeways on San Pablo Ave.
between the intersections,
creating a continuous, all
ages and abilities bicycle
crossing of San Pablo Avenue.
Images: Google Maps/ Street View
San Pablo Ave
Removed parking
for far-side bus stop
New parking/loading
space.
BUS STOP MOVES
BUS STOP MOVES
Bus bulbs allow buses to
spend less time stopped,
since they do not need to
wait to pull back into traffi c. It
also increases sidewalk space
for pedestrians.
Moving bus stops from near-side to far-side allows buses to get through intersections before stopping, reducing delays for passengers. Other drivers have increased visibility of pedestrians crossing the street as the bus does not block their view anymore.
San Pablo Ave.
MOVING BUS STOPS FROM NEAR-SIDE TO FAR-SIDE
OFF-SET CROSSING DIAGRAM
NEAR-SIDE STOP FAR-SIDE STOP
NOTICE OF POTENTIAL
BUS STOP CHANGE
AVISO DE POSIBLES CAMBIOS
EN LA PARADA DE AUTOBÚS
ପऽ
Virginia St
2nd St
5th St
4th St
Kains Ave
10th St
9th St
Delaware St
Cornell AveTalbot Ave
3rd St
Stannage Ave Evelyn Ave
Pierce St
Page St
Jones St
Adams St
Carmel Ave
Curtis St
Peralta Ave
Jackson St
Madison St
Harrison St
Liberty St
Cleveland Ave
Masonic Ave
Cerrito St
West St
a St
Brighton Ave
Franklin St
Taft Ave
Polk St
Behrens St
Spokane Ave
Dartmouth St
Washington Ave
C St
Garfield Ave
Lassen St
Berkeley Way
emite Ave
San Diego St
Northside Ave
Ohlone Ave
Belmont Ave
San Gabriel Ave
Hillside Ave
Short St
B St
Castro St
Monroe St
Taylor St
Clay St
Belvedere Ave
Fillmore St
Gateview Ave
Keoncre
Victoria St
A St
Johnson St
Juanita Way
Bataan Ave
Cedarwood Ln
Virginia Gardens
r
Washington Ave
Cornell Ave
Masonic Ave
Jackson St
Lincoln St
Francisco St
Adams St
Curtis St Delaware St
3rd St
Neilson St
Rose St
Santa Fe Ave
Santa Fe Ave
Curtis St
Neilson St
Short St
Portland Ave
5th St4th St
Peralta Ave
Carlson Blvd
Plaza Loop Road
67th St
61st St
9th St
Russell St
Derby St
8th St
Acton StMabel St
10th St
Carleton St
Heinz Ave
Dohr St
Harmon St
Potter St
Park St
Oregon St
Haskell St
Fairview St
Burnett St
Tyler St
Carrison St
Pardee St
Julia St
Wallace St
61st Pl
Dr
Peabody Ln
Boise St
Overland Ave
Oregon St
67th St
Ward St
Stanton St
Acton StMabel St
Carleton St
66th St
62nd St
er St
Herzog St
Russell St
65th St
Liquid Sugar Dr
Murray St
65th St
8th St
4th St
4th St
5th St
Parker St
Blake St
Derby St
Kains Ave
Acton St
9th St
Curtis St
Carleton St
Cornell Ave
Hearst Ave
Ward St
61st St
Page St
Stannage Ave
Talbot Ave
Bancroft Way
Ordway St
62nd St
66th St
64th St
63rd St
Bonar St
Camelia St
Harrison St
Vallejo St
Baker St
Grayson St
Mathews St
Chestnut St
Browning St
Ave
Pierce St
Byron St
Lo
w
Valley St
Idaho St
Edwards St
Anthony St
61st Pl
Cleveland Ave
Dwight Way
Tevlin St
Cutter Way
Gooding Dr
Francis St
Kinkhead Way
Chaucer St
Liberty Ship Way
Acton Cres
Cowper St
Park Way
Poe St
Occid
e
N Valley St
Acroft Ct
Helen Ct
Terra
ce
Sojourner Truth Ct
Alb
Addison St
Pomona Ave
Carmel Ave
California St
5th St
62nd St
4th St
Doyle St
66th St
West St
Ramona Ave
Addison St
Bay St
63rd
Alcatraz Ave
Alcatraz
Bancroft Way
63rd St
Bo
livar Dr
Stannage Ave
Cornell AveTalbot Ave
Stuart St
Allston Way
9th St
Allston Way
2nd St
4th St
7th St
Channing Way
8th St
10th St
7th St
West St
Ohlone Greenway
Albany Hill
Park
Ocean
View
Park
67t
Dr
65 66
Emeryville Greenway
Masonic Ave
e
Ohlone Greenway
Victoria St
V
Road
Ohlone Greenway
San Francisco Bay Trail
St
Ohlone Ave
t
t
Ocean View Bikeway
y
y
y
y
Ocean
View
Lower Cordonices Path
6th St
Marin Ave
San Pablo Ave
University Ave
Fairmount Ave
Key Route Blvd
Buchanan St
Ashbury Ave
Solano Ave
Eastshore Hwy
Gilman St
Berkeley
Oakland
Emeryville
Albany
Cedar Ave
Hopkins St
Ashby Ave
7th St
For more information and to provide feedback on the project visit alamedactc.org/sanpablo or email [email protected].
Para obtener más información y brindar comentarios sobre el proyecto, visite alamedactc.org/sanpablo o envíe un correo electrónico a [email protected]. ҈Նͫબઘalamedactc.org/sanpablo
ଽўਙ [email protected]澞
Post 12/01/22
Remove after 6/01/23
0429-22
Alameda County Transportation Commission is
leading the development of the San Pablo Avenue Corridor Improvements Project to improve safety for pedestrians and bicyclists, and to enhance bus service.*
This stop may change in one or more of the following ways:
• Extension of curb and widened sidewalk
• Relocation to far side of intersection (approx. 100 – 200 ft.) Timeline
Design: 2022 – 2024 • Construction: 2024 – 2026
La Comisión de Transporte del Condado de Alameda está liderando el desarrollo del Proyecto de Mejoras del Corredor de San Pablo Avenue para mejorar la seguridad de los peatones y ciclistas, y potenciar el servicio de autobús. Esta parada puede cambiar en una o más de las siguientes maneras:
• Ampliación de bordillo y ensanchamiento de la acera
• Reubicación al lado lejano de la intersección (aproximadamente 100 a 200 pies) Cronograma
Diseño: 2022 – 2024 • Construcción: 2024 – 2026
ճѪாऩͧSan Pablo Avenue Corridor
Improvements ProjectҠழॻՕਈљ
• ы੧ଳ
• ଈਙсՂ૨Սଓҋͧ100 - 200 ͨ
ગઋ2022 ਙ 2024 ٶ • 2024ਙ 2026 ٶ
Legend
New Bus Bulb (Existing
Rapid Stop)
New Bus Stop Location
Bus Stop Removed
Bus Stop Moved to
Adjacent Location
Existing Bus Stop
(To Remain)
Pedestrian/ Bicycle
Crossing Improvements
*This project is separate and distinct from AC Transit’s signal work that is currently underway. * Este proyecto es independiente y distinto de las obras de señalización de AC Transit que se están llevando a cabo actualmente.
*ࣩٖݲ֧ࠔAC Transit 澞
0429-22 At-Stop Signage ACTC San Pablo Ave_TRI_D5.indd 10429-22 At-Stop Signage ACTC San Pablo Ave_TRI_D5.indd 1 1/6/23 11:561/6/23 11:56
San Pablo Avenue Safety Enhancements/Parallel Bike Improvements Projects Interactive Webmap Screen Capture
San Pablo Avenue Safety Enhancements and Parallel Bike Improvements City of Berkeley Design Issues Technical Appendix
Introduction
The Alameda County Transportation Commission (Alameda CTC) conducted community outreach to seek input on the design details of the San Pablo Avenue Safety Enhancements and Parallel Bike Improvements projects from December 2022-May 2023. This outreach effort, which was conducted in partnership with the cities of Albany, Berkeley, and Oakland and AC Transit, yielded a number of location-specific suggestions and comments related to the design.
This document summarizes these comments and design changes that were made in response to the feedback. The document focuses on locations within the City of Berkeley that generated a significant volume of comments and comments that appeared multiple times and is not intended to be a comprehensive log of all comments received across all project outreach.
City of Berkeley Design Issues
• SB Bus bulbs at Dwight and University – the bus bulb lengths were shortened to 130’ of red curb (110’ of stop length) to reduce parking loss. At University, the 130’ length means no additional parking will be removed. At Dwight, parking loss was reduced from 3 spaces to 2 spaces. The 110’ length provides future operational flexibility for multiple bus arrivals, including articulated buses.
• NB bus stop at Cedar and SB bus stop at Allston – the bus stops were retained at their current nearside location, due to existing side street parking prohibition (at Cedar) and driveways in the bus stop area (at Allston). An additional consideration is that these intersections are signalized so there is no concern related to a bus blocking the line of sight to a pedestrian crossing in front of the bus.
• NB bus stop at Oregon – the proposed bus stop location was changed from farside of Oregon to farside of Heinz due to driveway constraints in the bus stop area. • NB and SB Channing bus stop locations – one or more businesses objected to parking removal associated with a bus stop relocation. It was determined that the benefits to safety and bus operations outweigh the potential business impacts. Considerations include that the intersection is an uncontrolled pedestrian crossing where the nearside stop creates a multiple threat collision scenario.
• Bike boulevard routing between Virginia and Camelia (Kains/Cedar/Hopkins) – the bike boulevard routing was changed from Virginia – Kains to Virginia – Stannage – Camelia – Kains. New traffic circles were added at Virginia/Stannage and Camelia/Stannage and new flashing beacons/bulbouts were added at Stannage/Cedar and Stannage/Hopkins.
Proposed traffic circles at Virginia/Kains and bikeway crossing treatments at Kains/Cedar/Hopkins were removed. Considerations included challenges with sight lines and complex, closely spaced traffic movements at the intersections of Kains/Cedar/Hopkins.
• Kains/Gilman– bulbouts were added to supplement the proposed RRFB. It is also noted that the project will change the lane configuration along eastbound San Pablo at Gilman which will eliminate the current merge that happens just east of Gilman (approaching Kains).
• Pardee/9th diverter – although recommended in the 2017 Bike Plan, the diverter was removed due to traffic operations issues with routing more traffic near the Acme bakery which is along a narrow street and has numerous delivery trucks staged. • Channing/10th diverter – although recommended in the 2017 Bike Plan, this was not included due to the presence of a new proposal for a diverter median closure on San Pablo Avenue which was not anticipated by the Bike Plan. The San Pablo Ave diverter serves the purpose of the Channing/10th diverter originally envisioned in the Bike Plan. • 9th St n/o Cedar – several comments were received that the bikeway facility should be changed from a Class III to a Class II bikeway north of Cedar Street. The Class III bikeway facility was retained based on the existing good pavement condition and need to do additional pavement surface treatments if striping changes were to be implemented.
• Stop-control changes along bicycle boulevard streets – several comments were received that the project should change stop-control along bicycle boulevard streets. Several additional intersections where changed to be side-street stop control in which traffic along a bicycle boulevard can proceed without stopping. In addition, traffic circle intersections were changed from stop-control to yield-control. • Additional speed humps – several comments were received that the project should install additional speed humps along bicycle boulevard streets. Speed tables were added along bicycle boulevard streets including Kains St, Camelia St, Stannage St, Mabel St, Idaho St, Harrison St, and 9th Street.
• Mabel/65th St bikeway routing – the parallel bike network routing was changed in the vicinity of Mabel/65th. Parallel Bike segments between along 66th between Mabel and Herzog and along Herzog between 66th and 65th were deleted and a segment was added along 65th between Herzog and Idaho. The change in routing provides for a more direct east-west connection between 65th St and Harmon St, which is a planned City of Berkeley Bike Boulevard route.
Public
Department of Public Works
Transportation Division
1947 Center Street, 4th Floor, Berkeley, CA 94704 Tel: 510.981-7010 TDD: 510.981-6903 Fax: 510.981-7060
July 20, 2023
To: Berkeley Transportation and Infrastructure Commission From: Eric Anderson, Acting Principal Transportation Planner Elliott Schwimmer, Associate Transportation Planner
Re: San Pablo Avenue Multimodal Corridor Program: Safety Enhancement and Parallel Bike Improvements Projects
Staff Recommendation
Recommend that the Transportation and Infrastructure Commission (TIC) recommend that the City Council:
1. Approve the conceptual designs for the San Pablo Avenue Multimodal Corridor Program: Safety Enhancement and Parallel Bike Improvements Projects within the City of Berkeley, and
2. Direct city staff to partner with the Alameda County Transportation Commission on final design and implementation of these projects.
Background
The memorandum and materials from the Alameda County Transportation Commission (Alameda CTC) staff report provide extensive background and discussion on this item.
As stated in the report, Alameda CTC is leading the development of the San Pablo Avenue Multimodal Corridor Program, which consists of three projects to improve safety and multimodal access. This TIC item concerns the Safety Enhancement and Parallel Bike Improvement projects, which are both partially within the City of Berkeley.
The three projects were identified as part of a multi-year planning effort that began in 2017 and were approved by the Alameda CTC in March 2022. The fundamental purpose of the three projects is to implement project recommendations from Berkeley City Council adopted plans, including the 2017 Bike Plan, the 2020 Pedestrian Plan, the 2022 Transit First Implementation Plan, and the 2020 Vision Zero Action Plan.
Since 2017, beginning with the initial scoping of these projects, City staff has worked closely with Alameda CTC. Throughout the development of these projects, City staff has asked Alameda CTC staff to follow established City of Berkeley and Department of
Public
July 13, 2023
Re: San Pablo Avenue Multimodal Corridor Program: Safety Enhancement and Parallel Bike Improvements Projects
Public Works processes and workflow, including internal and external technical agency stakeholder review, public stakeholder engagement, TIC review, and eventual recommendation for Berkeley City Council conceptual approval.
Alameda CTC staff have engaged City of Berkeley staff as well as other cities’s staff, AC Transit, and Caltrans in seeking technical review and comment. As is typical for City-led transportation projects, Alameda CTC engaged multiple City departments through a series of design review and comment meetings. Where necessary, Alameda CTC and City staff have collaborated to solicit follow-up input and in some cases organized focused follow-up meetings to ensure engagement with all necessary City of Berkeley technical stakeholders. City of Berkeley comments have been incorporated through changes to the conceptual project design.
Through online, mailing, and in-person outreach activities, Alameda CTC has sought feedback from hundreds of merchants, residents, and others who rely on the San Pablo Avenue Corridor. Alameda CTC has hosted outreach activities with stakeholders that have a particular interest in the projects, including the Berkeley Neighborhood Council, the Alameda CTC Bicycle and Pedestrian Advisory Committee, and, on March 30, 2023, a two-hour public open house at the Berkeley Adult School on San Pablo Avenue in Berkeley that included approximately 100 participants, including City of Berkeley and other agency staff. Many public comments were also incorporated through changes to the conceptual project design, which changes were subsequently reviewed by City staff for consistency with the City’s previous comments and with City Council adopted plans, policies, and Public Works engineering design practices.
Alameda CTC staff is seeking Berkeley City Council approval of the conceptual project designs before entering the subsequent engineering design phases. City staff anticipates that continued partnership with Alameda CTC on the San Pablo Avenue Multimodal Corridor Program will support the delivery of much-needed traffic safety and transit operations improvements along the San Pablo Avenue corridor.
New curb extension
and curb ramps
Removal of 2
parking spots
Tree remains
in place
One-way Class IV
separated bikeway
with curb barrier
Reconstruct
curb ramp
Closure of
driveway and
reconstruction
of curb ramp
Removal of 1
parking spot
Reconstruct
curb ramps
Removal of 4
parking spots
One-way Class IV
separated bikeway
with curb barrier
Reconstruct
curb ramp
New Pedestrian
Hybrid Beacon or
Traffic Signal
New bicycle
crossing
Removal of 1
parking spot
4' curb ext
11' lane
11' lane
11' lane
11' lane
6' bike lane
2' curb
8' ped
10'
bike
6' bike lane
2' curb
No right turn from
northbound San
Pablo except
Fire Dept
Removal of 2
parking spots
Removal of
street tree
Two-way Class IV
separated bikeway
Closure of
driveway and
reconstruction
of curb ramp
Removal of 1
parking spot
Reconstruct
curb ramps
Reconstruct
curb ramp
New Rectangular
Rapid-Flashing
Beacons (RRFBs)
New curb extension
and re-oriented
curb ramps
Removal of 1
parking spot
4' curb ext
10' bikeway
2' curb
11' lane
10.5' lane
8.5' sidewalk
11' lane
11' lane
8' parking