Request by Resolution that PG&E Underground Utilities in Berkeley’s VHFHSZ CONSENT CALENDAR January 30, 2024
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
California wildfires emit as much carbon as almost 2 million cars every year.
Undergrounding reduces wildfire risk.
CONTACT PERSON
Vice Mayor Susan Wengraf Council District 6 510-981-7160 Attachments:
1: Resolution
2: AP News Study
3: July 2021 letter to PG&E CEO Patti Poppe
4: CAL FIRE VHFHSZ Designation in Berkeley Map
RESOLUTION NO. ##,###-N.S.
URGING PG&E TO UNDERGROUND BERKELEY’S VHFHSZ
WHEREAS, Pacific Gas and Electric (PG&E) states that undergrounding reduces ignitions by 99%, making it one of the most effective ways to reduce wildfire risk; and WHEREAS, Senate Bill 884 (McGuire), which became law in 2023, expedites the undergrounding of utility lines and allows use of federal infrastructure funds; and WHEREAS, PG&E has committed to protect communities from wildfire threat by undergrounding 10,000 miles of power lines in the Highest Fire Threat Districts; and WHEREAS, the Panoramic Hill neighborhood is in CAL FIRE’s Very High Fire Hazard Severity Zone and Berkeley’s Fire Department has designated it with the highest severity level in the City of Berkeley, Fire Zone 3; and WHEREAS, the North East Berkeley Hills also carry CAL Fire’s designation of Very High Fire Hazard Severity Zone and the 94708 ZIP Code, which encompasses most of the NE Hills, was designated as “being roughly within the worst 1% in the state when it comes to population-to-evacuation-route ratios” in 2019 by an AP News Analysis.
NOW THEREFORE, BE IT RESOLVED that the Council of the City of Berkeley urges PG&E to include the areas designated by CAL FIRE: Panoramic Hill neighborhood and the North East Berkeley Hills designated as Very High Fire Hazard Severity Zones, into its 10,000 miles of undergrounding in the Highest Fire Threat Districts.
BE IT FURTHER RESOLVED that the Council of the City of Berkeley requests the City Manager issue a press release about this Resolution as a critical Public Safety matter.
Exhibits
A: AP News: How we analyzed California’s wildfire evacuation routes
Resolution Urging PG&E to Underground Berkeley’s VHFHSZ CONSENT CALENDAR January 30, 2024
Resolution Urging PG&E to Underground Berkeley’s VHFHSZ CONSENT CALENDAR January 30, 2024
Resolution Urging PG&E to Underground Berkeley’s VHFHSZ CONSENT CALENDAR January 30, 2024
Resolution Urging PG&E to Underground Berkeley’s VHFHSZ CONSENT CALENDAR January 30, 2024
Resolution Urging PG&E to Underground Berkeley’s VHFHSZ CONSENT CALENDAR January 30, 2024
Resolution Urging PG&E to Underground Berkeley’s VHFHSZ CONSENT CALENDAR January 30, 2024
Resolution Urging PG&E to Underground Berkeley’s VHFHSZ CONSENT CALENDAR January 30, 2024
Resolution Urging PG&E to Underground Berkeley’s VHFHSZ CONSENT CALENDAR January 30, 2024
Resolution Urging PG&E to Underground Berkeley’s VHFHSZ CONSENT CALENDAR January 30, 2024
Resolution Urging PG&E to Underground Berkeley’s VHFHSZ CONSENT CALENDAR January 30, 2024
https://34c031f8-c9fd-4018-8c5a-4159cdff6b0d-cdn-endpoint.azureedge.net/- /media/osfm-website/what-we-do/community-wildfire-preparedness-and-mitigation/fire- hazard-severity-zones/fire-hazard-severity-zones-map/upload-1/berkeley.pdf
Berkeley City Councilmembers
Mark Humbert, District 8
Ben Bartlett, District 3
2180 Milvia Street, 5th Floor
Berkeley, CA 94704
[email protected]
[email protected]
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7120 ● TDD: (510) 981-6903 E-Mail: [email protected]
ACTION CALENDAR
January 30, 2024
To: Honorable Mayor and Members of the City Council
From: Councilmember Humbert (Author), Councilmember Bartlett (Co-Author) Subject: Budget Referral: Additional Security Cameras at Intersections Experiencing Increased Violent Crime
RECOMMENDATION
In order to deter violent crime and obtain evidence to solve criminal investigations, adopt the following recommendations:
1. Authorize the City Manager to install additional security cameras, prominent signage, and increased lighting in the public right-of-way at intersections experiencing a rise in violent crime and/or which include arterial streets offering entry/exit points for Berkeley.
2. Refer costs for security cameras and lighting to the next budget process.
Security camera footage would be used solely for the purpose of solving criminal investigations. The cameras are not intended and would not be used for continuous surveillance purposes. Cameras should ideally be compatible with those already in use at San Pablo Park under Contract Nos. 31900080 and 31900205 and those deployed at other intersections throughout the city.
Priority intersections for security camera installation would include:
● Alcatraz and College
● Woolsey and Telegraph
● Woolsey and Shattuck
● Alcatraz and Adeline
● Alcatraz and Sacramento
FINANCIAL IMPLICATIONS
Estimated one-time costs to install cameras, signage and lighting are likely to range from $83,000 to $167,000 per intersection, plus $44,000 annually for data, software and maintenance. Total costs would vary based on the number of intersections selected.
Specifically, total one-time costs for prioritizing the five intersections recommended by the authors would be $415,000 to $835,000 plus ongoing data, software and maintenance costs of $220,000.
Budget Referral: Additional Security Cameras in Public Right of Way ACTION CALENDAR January 30. 2024
CURRENT SITUATION AND ITS EFFECTS
According to data from the Berkeley Police Department (BPD), 2023 saw 357 robberies in Berkeley, a 31 percent increase from 2022.1 A considerable number of these robberies targeted elderly victims with violent attacks, such as the one that took place in December 2023 near College and Alcatraz.2 In this particular case, a private security camera recorded the suspect subsequently stealing a car, and the footage proved instrumental in their later apprehension.3 Violent muggings of elders and women have also recently taken place in the vicinity of the Ashby BART station.
High-quality images of suspects and their vehicles would provide valuable investigative leads to assist efforts to bring accountability for violent gun crimes. Shootings often involve suspects who flee the area of the crime in their vehicles. Police investigating the crime often rely on private security cameras owned by residents and/or businesses to obtain video evidence. For these reasons, the City Council already approved funding for and installation of multiple security cameras across the city. Installing additional high- quality cameras at major arterials would expand access to video and allow investigators to check the footage for suspects fleeing the crime area in their vehicle.
Map showing 1-year of crime data in vicinity of southern District 3. (From BPD Transparency Hub) 1 Gecan, Alex N. (2023), Catalytic converter thefts went down in Berkeley this year, but robberies went up, Berkeleyside, https://www.berkeleyside.org/2023/12/29/berkeley-crime-data-2023 2 NBC Bay Area (2023), Berkeley woman speaks out after being mugged, car stolen by thieves, https://www.youtube.com/watch?v=skMisXDQTJk
3 Raguso, Emilie (2023), Berkeley robbery suspect facing new charges after car theft, https://www.berkeleyscanner.com/2023/12/27/arrests/berkeley-robbery-suspect-new-charges/
Budget Referral: Additional Security Cameras in Public Right of Way ACTION CALENDAR January 30. 2024
Map showing 1-year of crime data in vicinity of southern District 8. (From BPD Transparency Hub) The City already urges private property owners with security cameras to register their cameras with BPD to assist in criminal investigations, and property owners readily avail themselves of this resource. According to the Department, as of 2021 a total of 283 security cameras owned by private citizens and businesses are currently registered with BPD. Valuable public safety resources should not be delegated entirely to the voluntary cooperation of private entities, particularly when violent gunfire has occurred in many public spaces including parks and major intersections.
Strategically placed cameras should be of sufficient quality to capture high resolution video. Cameras would not be equipped with Automated License Plate Readers (ALPR) and would not be continuously monitored. The recordings would be an investigative resource which officers could access while investigating specific crimes and could assist in a reduction of crime. This would be an additional element of our Police Department’s crime prevention strategies.
“Stationary security cameras affixed to City property or facilities” are not regulated under the Surveillance Technology Ordinance (BMC Section 2.99.020.1.i). As a result, stationary camera installation at major thoroughfares would be exempt from the requirements of BMC Chapter 2.99.
Providing security cameras in the public right-of-way is a Strategic Plan Priority Project, advancing our goal to create a resilient, safe, connected, and prepared city.
Budget Referral: Additional Security Cameras in Public Right of Way ACTION CALENDAR January 30. 2024
BACKGROUND
A 2011 report4 from The Urban Institute’s Justice Policy Center noted that cameras can be an effective tool for preventing crimes and supporting investigations. These tools appear fiscally prudent both as tools for investigations, and with the installation and maintenance of security cameras being less costly than the costs associated with crimes that may take place without them. Moreover, an experiment conducted at the University of Twente in the Netherlands finds evidence that the presence of security cameras can encourage “prosocial” and “helping behavior” among bystanders.5 Berkeley’s Police Department has been conducting Crime Prevention Through Environmental Design (CPTED) assessments for neighborhoods throughout the City over the past several years. These assessments include recommendations such as:
increased lighting, maintenance of properties, landscaping and signage that can be used to deter criminal behavior.
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
None.
CONTACT PERSON
Councilmember Mark Humbert Council District 8 510-981-7180 Councilmember Ben Bartlett Council District 3 510-981-7130 4 La Vigne, N. G., et al. (2011). Evaluating the use of public surveillance cameras for crime control and prevention. Washington, DC: US Department of Justice, Office of Community Oriented Policing Services.
Urban Institute, Justice Policy Center, 1-152.
5Van Rompay, T. J., et al. (2009). The eye of the camera: Effects of security cameras on prosocial behavior. Environment and Behavior, 41(1), 60-74. Retrieved from http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.844.4026&rep=rep1&type=pdf
Item Removed From
Agenda
This item has been removed from the agenda by the
City Manager.
If you have questions regarding this report, please
contact the person noted on the agenda.
City Clerk Department
2180 Milvia Street
Berkeley, CA 94704
(510) 981-6900
The City of Berkeley, City Council’s Website
https://berkeleyca.gov/your-government/city-council
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager
INFORMATION CALENDAR
January 30, 2024
To: Honorable Mayor and Members of the City Council
From: Dee Williams-Ridley, City Manager
Submitted by: Jordan Klein, Director, Planning and Development Department Subject: LPO NOD: 2119 Marin Avenue, #LMSAP2023-0003
INTRODUCTION
The attached Landmarks Preservation Commission Notice of Decision (NOD) is presented to the Mayor and City Council pursuant to Berkeley Municipal Code/Landmarks Preservation Ordinance (BMC/LPO) Section 3.24.240.A, which requires that “a copy of the Notice of Decision shall be filed with the City Clerk and the City Clerk shall present said copy to the City Council at its next regular meeting.”
CURRENT SITUATION AND ITS EFFECTS
The Landmark Preservation Commission (LPC/Commission) approved a Structural Alteration Permit (SAP) to make alterations to the subject City Structure of Merit property. This action is subject to a 15-day appeal period, which began on January 16, 2024.
BACKGROUND
BMC/LPO Section 3.24.300 allows City Council to review any action of the Landmarks Preservation Commission in granting or denying a Structural Alteration Permit. For Council to review the decision on its merits, Council must appeal the NOD. To do so, a Council member must move this Information Item to Action and then move to set the matter for hearing on its own. Such action must be taken within 15 days of the mailing of the Notice of Decision, or by January 30, 2024. Such certification to Council shall stay all proceedings in the same manner as the filing of an appeal.
If the Council chooses to appeal the action of the Commission, then a public hearing will be set. The Council must then rule on the designation within 30 days of closing the hearing, otherwise the decision of the Commission is automatically deemed affirmed.
Unless the Council wishes to review the determination of the Commission and make its own decision, the attached NOD is deemed received and filed.
LPC NOD: 2119 Marin Avenue/#LMSAP2023-0003 INFORMATION CALENDAR January 30, 2024
ENVIRONMENTAL SUSTAINABILITY & CLIMATE IMPACTS
Landmark designation provides opportunities for the adaptive re-use and rehabilitation of historic resources within the City. The rehabilitation of these resources, rather than their removal, achieves construction and demolition waste diversion, and promotes investment in existing urban centers.
POSSIBLE FUTURE ACTION
The Council may choose to certify or appeal the decision, setting the matter for public hearing at a future date.
FISCAL IMPACTS OF POSSIBLE FUTURE ACTION
There are no known fiscal impacts associated with this action.
CONTACT PERSON
Fatema Crane, Principal Planner/LPC Secretary; Planning and Development Department, 510-981-7410
Reina Kapadia, AICP, Senior Planner; Planning and Development Department, 510-981-7485
Attachments:
1: Notice of Decision – 2119 Marin Avenue, #LMSAP2023-0003
Attachment 1, part 1
L A N D M A R K S
P R E S E R V A T I O N
C O M M I S S I O N
N o t i c e o f D e c i s i o n
DATE OF BOARD DECISION: November 2, 2023
DATE NOTICE MAILED: January 15, 2024
APPEAL PERIOD EXPIRATION: January 30, 2024
EFFECTIVE DATE OF PERMIT (Barring Appeal or Certification): January 31, 20241 2119 Marin Avenue – The Laflin House
Structural Alteration Permit (#LMSAP2023-0003) to complete exterior façade and roof alterations to a City Structure of Merit property.
The Landmarks Preservation Commission of the City of Berkeley, after conducting a public hearing, APPROVED the Structural Alteration Permit request. Property Owner: Michael and Anne Ray
2119 Marin Avenue
Berkeley, CA 94707
Project Applicant & Architect: Kerstin Fischer
Fischer Architects
2984 San Pablo Avenue
Berkeley, CA 94702
ZONING DISTRICT: Single Family Residential, Hillside Overlay (R-1H) 1 Pursuant to BMC Chapter 3.24, the City Council may “certify” any decision of the LPC for review, which has the same effect as an appeal. In most cases, the Council must certify the LPC decision during the 14-day appeal period. However, pursuant to BMC Section 1.04.070, if any portion of the appeal period falls within a Council recess, the deadline for Council certification is suspended until the first Council meeting after the recess, plus the number of days of the appeal period that occurred during the recess, minus one day. If there is no appeal or certification, the Use Permit becomes effective the day after the certification deadline has passed.
LANDMARKS PRESERVATION COMMISSION
NOTICE OF DECISION
#LMSAP2023-0003
2119 Marin Avenue
Mailed: January 15, 2024
ENVIRONMENTAL REVIEW STATUS: The project is categorically exempt from further environmental review in accordance with CEQA Guidelines Section 15331 for Historical Resource Restoration/Rehabilitation.
LANDMARKS PRESERVATION COMMISSION
NOTICE OF DECISION
#LMSAP2023-0003
2119 Marin Avenue
Mailed: January 15, 2024
The application materials for this project is available online at:
https://berkeleyca.gov/construction-development/land-use-development/zoning-projects or https://permits.cityofberkeley.info/CitizenAccess/Default.aspx
FINDINGS AND CONDITIONS OF APPROVAL AND APPROVED PLANS ARE ATTACHED
TO THIS NOTICE
COMMISSION VOTE: 8-0-0-0 (note: one vacancy)
YES: CRANDALL, ENCHILL, LEUSCHNER, MONTGOMERY, SCHWARTZ, TWU,
FINACOM, LINVILL
NO: NONE
ABSTAIN: NONE
ABSENT: NONE
TO APPEAL THIS DECISION (see Section 3.24.300 of the Berkeley Municipal Code):
To appeal a decision of the Landmarks Preservation Commission to the City Council you must:
1. Submit a letter clearly and concisely setting forth the grounds for the appeal to the City Clerk, located at 2180 Milvia Street, 1st Floor, Berkeley. The City Clerk’s telephone number is (510) 981-6900.
a. Pursuant to BMC Section 3.24.300.A, an appeal may be taken to the City Council by the application of the owners of the property or their authorized agents, or by the application of at least fifty residents of the City aggrieved or affected by any determination of the commission made under the provisions of Chapter 3.24.
2. Submit the required fee (checks and money orders must be payable to ‘City of Berkeley’):
a. The basic fee for persons other than the applicant is $1,500. This fee may be reduced to $500 if the appeal is signed by persons who lease or own at least 50 percent of the parcels or dwelling units within 300 feet of the project site, or at least 25 such persons (not including dependent children), whichever is less. Signatures collected per the filing requirement in BMC Section 3.24.300.A may be counted towards qualifying for the reduced fee, so long as the signers are qualified. The individual filing the appeal must clearly denote which signatures are to be counted towards qualifying for the reduced fee.
LANDMARKS PRESERVATION COMMISSION
NOTICE OF DECISION
#LMSAP2023-0003
2119 Marin Avenue
Mailed: January 15, 2024
b. The fee for appeals of affordable housing projects (defined as projects which provide 50 percent or more affordable units for households earning 80% or less of Area Median Income) is $500, which may not be reduced.
c. The fee for all appeals by Applicants is $5,520.
3. The appeal must be received prior to 5:00 p.m. on the "APPEAL PERIOD EXPIRATION" date shown above (if the close of the appeal period falls on a weekend or holiday, then the appeal period expires the following business day).
If no appeal is received, the Structural Alteration Permit will be final on the first business day following expiration of the appeal period.
NOTICE CONCERNING YOUR LEGAL RIGHTS:
If you object to this decision, the following requirements and restrictions apply:
1. If you challenge this decision in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence delivered to the Landmarks Preservation Commission at, or prior to, the public hearing.
2. You must appeal to the City Council within fifteen (15) days after the Notice of Decision of the action of the Landmarks Preservation Commission is mailed. It is your obligation to notify the Land Use Planning Division in writing of your desire to receive a Notice of Decision when it is completed.
3. Pursuant to Code of Civil Procedure Section 1094.6(b) and Government Code Section 65009(c)(1), no lawsuit challenging a City Council decision, as defined by Code of Civil Procedure Section 1094.6(e), regarding a use permit, variance or other permit may be filed more than ninety (90) days after the date the decision becomes final, as defined in Code of Civil Procedure Section 1094.6(b). Any lawsuit not filed within that ninety (90) day period will be barred.
4. Pursuant to Government Code Section 66020(d)(1), notice is hereby given to the applicant that the 90-day protest period for any fees, dedications, reservations, or other exactions included in any permit approval begins upon final action by the City, and that any challenge must be filed within this 90-day period.
5. If you believe that this decision or any condition attached to it denies you any reasonable economic use of the subject property, was not sufficiently related to a legitimate public purpose, was not sufficiently proportional to any impact of the project, or for any other reason constitutes a “taking” of property for public use without just compensation under the California or United States Constitutions, your appeal of this decision must include the following information:
A. That this belief is a basis of your appeal.
B. Why you believe that the decision or condition constitutes a "taking" of property as set forth above.
LANDMARKS PRESERVATION COMMISSION
NOTICE OF DECISION
#LMSAP2023-0003
2119 Marin Avenue
Mailed: January 15, 2024
C. All evidence and argument in support of your belief that the decision or condition constitutes a “taking” as set forth above.
If you do not do so, you will waive any legal right to claim that your property has been taken, both before the City Council and in court.
PUBLIC COMMENT:
Communications to Berkeley boards, commissions or committees are public record and will become part of the City’s electronic records, which are accessible through the City’s website.
Please note: e-mail addresses, names, addresses, and other contact information are not required, but if included in any communication to a City board, commission or committee, will become part of the public record. If you do not want your e-mail address or any other contact information to be made public, you may deliver communications via U.S. Postal Service or in person to the secretary of the relevant board, commission or committee. If you do not want your contact information included in the public record, please do not include that information in your communication. Please contact the secretary to the relevant board, commission or committee for further information.
FURTHER INFORMATION:
Questions about the project should be directed to the project planner, Reina Kapadia, at (510) 981-7485 or [email protected]. All project application materials may be viewed at the Permit Service Center (Zoning counter), 1947 Center Street, 3 rd Fl., during regular business hours.
ATTACHMENTS:
1. Findings and Conditions
2. Project Plans and Materials Information
ATTEST:
Fatema Crane, Secretary
Landmarks Preservation Commission
cc: City Clerk
Applicant: Kerstin Fischer, Fischer Architects, 2984 San Pablo Avenue, Berkeley, CA 94702
Property Owner: Michael and Anne Ray, 2119 Marin Avenue, Berkeley, CA 94707
Interested Party: Daniel Fisher and Kirsten Tranter, 2125 Marin Avenue, Berkeley, CA 94707
A t t a c h m e n t 1, Part 2
F i n d i n g s a n d C o n d i t i o n s
1947 Center Street, Berkeley, CA 94704 Tel: 510.981.7410 TDD: 510.981.7474 Fax: 510.981.7420 Email: [email protected]
2119 Marin Avenue – The Laflin House
Structural Alteration Permit #LMSAP2023-0003 to complete exterior façade and roof alterations to a City Structure of Merit property.
CEQA FINDINGS
1. The project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA, Public Resources Code §21000, et seq. and California Code of Regulations, §15000, et seq.) pursuant to Section 153331 of the CEQA Guidelines (“Historic Resource Restoration/Rehabilitation”). Furthermore, none of the exceptions in CEQA Guidelines Section 15300.2 apply, as follows: (a) the site is not located in an environmentally sensitive area, (b) there are no cumulative impacts, (c) there are no significant effects, (d) the project is not located near a scenic highway, and (e) the project site is not located on a hazardous waste site pursuant to Government Code Section 65962.5.
SECRETARY OF THE INTERIOR’S STANDARDS FINDINGS
Regarding the Secretary of the Interior’s Standards for Rehabilitation, the Landmarks Preservation Commission of the City of Berkeley makes the following findings:
1. The subject property features a single-family residence designed by Walter H. Ratcliff, Jr. The use of the property would continue, unchanged, with this project.
2. As conditioned, the project will retain the historic character of the property and will avoid extensive removal of distinctive materials and the alteration of features that characterize the property.
3. This property will continue to be recognized as a physical record of its time, place, and use as a result of the approved project. None of the proposed alterations are found to create a false sense of historical development.
4. No changes to this property that have acquired historic significance in their own right, would be impacted by this project. The majority of alterations are located on the rear elevation at the area of the 1978 addition, which is not considered to have acquired historic significance.
2119 MARIN AVENUE STRUCTURAL ALTERATION PERMIT - Findings and Conditions
5. Distinctive materials, features, finishes, and construction techniques, or examples of craftsmanship that characterize this property, such as the exterior wood shingles and lap siding of the main building, will be preserved and refurbished where possible with this project, and only replaced in-kind where preservation is not physically feasible.
6. As conditioned herein, if deteriorated historic features will be affected by this request, then they would be repaired or replaced to match the materials, design, and finishes of the original items.
7. Chemical or physical treatments are not anticipated; however, if they are appropriate, they will be undertaken using the gentlest means possible. Treatments that cause damage to historic materials are prohibited by the Conditions herein.
8. The project site is not known to have the potential to yield subsurface resources; the scope of proposed excavation is limited and not likely to disturb such resources if they exist. Nevertheless, as conditioned herein, actions to preserve and protect unexpected discoveries during project construction are required
9. Since the proposed new work does not involve a new addition and relates to changes to the facades of the existing structure, the work has been designed in a manner to increase compatibility with the historic structure. The project utilizes complementary, high-quality materials employing colors and finishes that harmonize with the historic design elements of the building. New siding at the area of the 1978 (non-historic) addition will be sufficiently differentiated from the historic siding design.
10. If the proposed façade alterations, re-roofing, or painting were to be removed or reversed in the future, the essential form and integrity of the historic property and its environment would be unimpaired.
2119 MARIN AVENUE STRUCTURAL ALTERATION PERMIT - Findings and Conditions
LANDMARK PRESERVATION ORDINANCE FINDINGS
1. As required by Section 3.24.260 of the Landmarks Preservation Ordinance, the Commission finds that the proposed work is appropriate for and consistent with the purposes of the Ordinance, and will preserve and enhance the characteristics and features specified in the designation for this property, because:
A. The proposed project will not adversely affect the architectural design of the City Structure of Merit Laflin House because the scope of work is limited to minor alteration such as enlargement of windows that are similar to and compatible with the Shingle style of the residence. The placement and spatial arrangements of the property will be retained as the proposed façade and roofing material alterations do not impact the footprint and volume of the historic structure. As conditioned, the removal of historic materials, such as original windows and exterior cladding materials, will be minimized to the greatest extent possible.
B. The special character and historic value of this City Structure of Merit property lay in its direct associations with the notable architect Walter H. Ratcliff, Jr., Shingle-style architecture, and as a contemporary of nearby City Landmarks (Elmer Buckman House, 1910, and Northbrae Public Improvements, 1907). The proposed work would not impair these associations.
2119 MARIN AVENUE STRUCTURAL ALTERATION PERMIT - Findings and Conditions
STANDARD CONDITIONS
The following conditions, as well as all other applicable provisions of the Landmarks Preservation Ordinance, apply to this Permit:
1. Conditions Shall be Printed on Plans
The conditions of this Permit shall be printed on the second sheet of each plan set submitted for a building permit pursuant to this Permit, under the title ‘Structural Alteration Permit Conditions’. Additional sheets may also be used if the second sheet is not of sufficient size to list all of the conditions. The sheet(s) containing the conditions shall be of the same size as those sheets containing the construction drawings; 8-1/2” by 11” sheets are not acceptable.
2. Plans and Representations Become Conditions
Except as specified herein, the site plan, floor plans, building elevations and/or any additional information or representations, whether oral or written, indicating the proposed structure or manner of operation submitted with an application or during the approval process are deemed conditions of approval.
3. Subject to All Applicable Laws and Regulations
The approved construction is subject to, and shall comply with, all applicable City Ordinances and laws and regulations of other governmental agencies. Prior to installation, the applicant shall obtain Use Permit approval in accordance with BMC Section 23C.17 (Wireless Telecommunication). Prior to construction, the applicant shall identify and secure all applicable permits from the Building and Safety Division, Public Works Department and other affected City divisions and departments.
4. Exercise and Lapse of Permits
B. A permit for the construction of a building or structure is deemed exercised when a valid City building permit, if required, is issued, and construction has lawfully commenced.
A. A permit may be declared lapsed and of no further force and effect if it is not exercised within one year of its issuance, except that permits for construction or alteration of structures or buildings may not be declared lapsed if the permittee has:
(1) applied for a building permit; or, (2) made substantial good faith efforts to obtain a building permit and begin construction, even if a building permit has not been issued and/or construction has not begun.
5. Indemnification Agreement
The permittee agrees as a condition of approval of this application to indemnify, protect, defend with counsel selected by the City, and hold harmless, the City, and any agency or instrumentality thereof, and its elected and appointed officials, officers, employees and agents, from and against any and all liabilities, claims, actions, causes of action,
2119 MARIN AVENUE STRUCTURAL ALTERATION PERMIT - Findings and Conditions
proceedings, suits, damages, judgments, liens, levies, costs and expenses of whatever nature, including reasonable attorney’s fees and disbursements (collectively, “Claims”) arising out of or in any way relating to the approval of this application, any actions taken by the City related to this entitlement, or any environmental review conducted under the California Environmental Quality Act, Public Resources Code Section 210000 et seq., for this entitlement and related actions. The indemnification shall include any Claims that may be asserted by any person or entity, including the permittee, arising out of or in connection with the approval of this application, whether or not there is concurrent, passive or active negligence on the part of the City, and any agency or instrumentality thereof, and its elected and appointed officials, officers, employees and agents. The permittee’s duty to defend the City shall not apply in those instances when the permittee has asserted the Claims, although the permittee shall still have a duty to indemnify, protect and hold harmless the City.
6. Halt Work/Unanticipated Discovery of Tribal Cultural Resources. In the event that cultural resources of Native American origin are identified during construction, all work within 50 feet of the discovery shall be redirected. The project applicant and project construction contractor shall notify the City Planning Department within 24 hours. The City will again contact any tribes who have requested consultation under AB 52, as well as contact a qualified archaeologist, to evaluate the resources and situation and provide recommendations. If it is determined that the resource is a tribal cultural resource and thus significant under CEQA, a mitigation plan shall be prepared and implemented in accordance with State guidelines and in consultation with Native American groups. If the resource cannot be avoided, additional measures to avoid or reduce impacts to the resource and to address tribal concerns may be required.
7. Archaeological Resources (Ongoing throughout demolition, grading, and/or construction).
Pursuant to CEQA Guidelines Section 15064.5(f), “provisions for historical or unique archaeological resources accidentally discovered during construction” should be instituted.
Therefore:
A. In the event that any prehistoric or historic subsurface cultural resources are discovered during ground disturbing activities, all work within 50 feet of the resources shall be halted and the project applicant and/or lead agency shall consult with a qualified archaeologist, historian or paleontologist to assess the significance of the find.
B. If any find is determined to be significant, representatives of the project proponent and/or lead agency and the qualified professional would meet to determine the appropriate avoidance measures or other appropriate measure, with the ultimate determination to be made by the City of Berkeley. All significant cultural materials recovered shall be subject to scientific analysis, professional museum curation, and/or a report prepared by the qualified professional according to current professional standards.
C. In considering any suggested measure proposed by the qualified professional, the project applicant shall determine whether avoidance is necessary or feasible in light of factors such as the uniqueness of the find, project design, costs, and other considerations.
2119 MARIN AVENUE STRUCTURAL ALTERATION PERMIT - Findings and Conditions
D. If avoidance is unnecessary or infeasible, other appropriate measures (e.g., data recovery) shall be instituted. Work may proceed on other parts of the project site while mitigation measures for cultural resources is carried out.
E. If significant materials are recovered, the qualified professional shall prepare a report on the findings for submittal to the Northwest Information Center.
8. Human Remains (Ongoing throughout demolition, grading, and/or construction ). In the event that human skeletal remains are uncovered at the project site during ground- disturbing activities, all work shall immediately halt and the Alameda County Coroner shall be contacted to evaluate the remains, and following the procedures and protocols pursuant to CEQA Guidelines Section 15064.5 (e)(1) . If the County Coroner determines that the remains are Native American, the City shall contact the California Native American Heritage Commission (NAHC), pursuant to Health and Safety Code Section 7050.5(c), and all excavation and site preparation activities shall cease within a 50-foot radius of the find until appropriate arrangements are made. If the agencies determine that avoidance is not feasible, then an alternative plan shall be prepared with specific steps and timeframe required to resume construction activities. Monitoring, data recovery, determination of significance and avoidance measures (if applicable) shall be completed expeditiously.
9. Paleontological Resources (Ongoing throughout demolition, grading, and/or construction).
In the event of an unanticipated discovery of a paleontological resource during construction, excavations within 50 feet of the find shall be temporarily halted or diverted until the discovery is examined by a qualified paleontologist (per Society of Vertebrate Paleontology standards [SVP 1995,1996]). The qualified paleontologist shall document the discovery as needed, evaluate the potential resource, and assess the significance of the find. The paleontologist shall notify the appropriate agencies to determine procedures that would be followed before construction is allowed to resume at the location of the find. If the City determines that avoidance is not feasible, the paleontologist shall prepare an excavation plan for mitigating the effect of the project on the qualities that make the resource important, and such plan shall be implemented. The plan shall be submitted to the City for review and approval.
ADDITIONAL CONDITIONS
The following additional conditions are attached to this Permit:
10. CITY PERMITS . This Structural Alteration Permit (SAP) approval is contingent upon approval of the requisite Use Permit and Public Work Permits for the project scope.
11. PLANS COMPLIANCE. Construction and building permit plans shall substantially conform to the SAP project plans dated/received December 21, 2022
12. REPAIR AND REPLACEMENT OF CHARACTER-DEFINING FEATURES.
Deteriorated historic features shall be repaired rather than replaced. Where the severity of deterioration requires replacement of a distinctive feature, the new feature shall match the old or historic feature in design, color, texture, and, where possible,
2119 MARIN AVENUE STRUCTURAL ALTERATION PERMIT - Findings and Conditions
materials. Replacement of missing features shall be substantiated by documentary and physical evidence.
13. PROJECT PLANS – REVISIONS REQUIRED. Prior to submittal of any building permit for this project, the applicant shall revise the proposed awning design on the rear (north) elevation to avoid diminishing of San Francisco from the residence to the east (2125 Marin Avenue) to the extent possible, for final approval by the Landmarks plan checker.
The applicant may submit a letter from the owner of the residence at 2125 Marin Avenue indicating that improvements were made to the proposed awning design.
14. Chemical or physical treatments, if appropriate, shall be undertaken using the gentlest means possible. Treatments that cause damage to historic materials shall not be used.
15. COLORS AND MATERIALS. Prior to submittal of any building permit for this project, the applicant shall submit a final color and materials board for review and approval by Landmarks staff, in coordination with the LPC Chair as needed. Approved colors and materials shall be denoted on the building permit set of drawings.
16. DETAILS. Prior to Landmarks plan checker sign-off of the Building Permit set of drawings, the applicant shall submit window, door, base, and trim details for review and approval by the Landmarks plan checker.
17. ROOF EQUIPMENT. Any roof equipment shall be shown to scale on the architectural drawings of the building permit set of drawings in both plan and elevation, in order to determine if additional screening and SAP may be required.
18. LIGHTING. Prior to Landmarks plan checker sign-off of the building permit set of drawings, the applicant shall submit lighting details showing all existing and proposed site and building lighting. Exterior lighting shall be downcast and not cause glare on the public right-of-way and adjacent parcels.
19. LANDSCAPE PLANS. Prior to Landmarks plan checker sign-off of the Building Permit set of drawings, the applicant shall submit a Landscape plan including the number, location, and species of all proposed plantings, and which existing plantings shall be removed. The applicant shall provide irrigation for all landscaped areas or provide drought tolerant plant palette. This shall be called out on Landscape building permit drawings.
20. LANDSCAPE IRRIGATION. The applicant shall provide irrigation for all landscaped areas. This shall be called out on Landscape building permit drawings.
21. CURB CUTS All curbs and curb cuts shall be constructed per the standards and specifications of the Public Works Department. Curb cuts no longer utilized shall be restored per the Public Works Department specifications.
2119 MARIN AVENUE STRUCTURAL ALTERATION PERMIT - Findings and Conditions
22. The applicant shall be responsible for identifying and securing all applicable permits from the Building and Safety Division and all other affected City divisions/departments prior to the start of work.
23. The applicant is responsible for complying with all the above conditions. Failure to comply with any condition could result in construction work being stopped, issuance of citations, as well as further review by the Landmarks staff, which may modify or impose additional conditions, or revoke approval.
24. All building permit drawings and subsequent construction shall substantially conform to the approved plans as outlined in Condition #1. Any modifications must be reviewed by the Landmarks plan checker to determine whether the modification requires approval.
25. The applicant shall hold harmless, defend, and indemnify the City of Berkeley and its officers, agents, and employees against any and all liability, damages, claims, demands, judgments or other losses (including without limitation, attorney’s fees, expert witness and consultant fees and other litigation expenses), referendum or initiative relating to, resulting from or caused by, or alleged to have resulted from, or caused by, any action or approval associated with the project. The indemnity includes without limitation, any legal or administrative challenge, referendum or initiative filed or prosecuted to overturn, set aside, stay or otherwise rescind any or all approvals granted in connection with the Project, any environmental determination made for the project and granting any permit issued in accordance with the project. This indemnity includes, without limitation, payment of all direct and indirect costs associated with any action specified herein. Direct and indirect costs shall include, without limitation, any attorney’s fees, expert witness and consultant fees, court costs, and other litigation fees. City shall have the right to select counsel to represent the City at Applicant’s expense in the defense of any action specified in this condition of approval. City shall take reasonable steps to promptly notify the Applicant of any claim, demand, or legal actions that may create a claim for indemnification under these conditions of approval.
2119 MARIN AVE
BERKELEY , CA 94707
OCTOBER 5, 2023
STRUCTURAL ALTERATIONS
Attachment 1, part 3
SHEET
DESCRIPTION
REV. DATE ISSUE DRWN.
2119 Marin Ave
Berkeley, CA 94707
APN: 061 258400300
RAY RESIDENCE
NOTES:
SITE PLAN AND INFO
A0.1
000
PROJECT DESCRIPTION
OWNER
Anne and Michael Ray
2119 Marin Ave
Berkeley, CA 94707
ARCHITECT
Fischer Architecture
2984 San Pablo Avenue
Berkeley, CA 94702
tel. 510.204.9250
Kerstin Fischer, Principal
Andrew Fischer, Principal
SYMBOLS / ABBREVIATIONS
Exterior Elevation / Section Cut
A-
Detail Key
GENERAL NOTES
Room
000
00 Room Name / Number
Door Number
Window Number
Elevation Marker
adj adjustable
af.f. above finished floor
blkg blocking
CL center line
clng ceiling
clr clear
dim dimension
DN down
dtl detail
dwg drawing(s)
ea each
el elevation (height)
elect electrical
elevs elevation (drawings)
eq equal
(e) existing
ext exterior
f.b.o. furnished by owner
f.f. finished floor
fluor fluroescent
ga gauge
galv galvanized
gyp. bd. gypsum board
hr hour
ht height
max maximum
mech mechanical
manuf manufacturer
min minimum
mtl metal
min minimum
mtl metal
NIC not in contract
NTS not to scale
(n) new
o.c. on center
opp opposite
o/ over
PL property line
Project Address: 2119 Marin Ave, Berkley, CA 94707
APN: 057 205602300
Zoning District: R-1H
Construction Type: V-B
Occupancy Type: R-3
Parking Spaces: 2 (garage)
Front Yard Setback: 20'-0"
Side Yard Setback: 4'-0"
Rear Yard Setback: 20'-0"
Number of Stories: 2
Basement: 1
Average Building Height: 26'-4" (no change)
Maxium Building Height: 32'-6" (no change)
Lot Area: 10,553 sq ft
Gross Building Area-existing
(residence and garage): 3,369 sq ft
Gross Building Area-proposed
(residence and garage): 3,400 sq ft
Applicable Codes: 2022 CBC, CRC, CEC, CPC, CMC, CFC,
Calif Green Building Code,
Calif Energy Code, BMC
Sprinkler System: No
Fire Alarm System: Yes
1. EXAMINATION OF THE SITE AND PORTIONS THEREOF WHICH WILL AFFECT THIS WORK SHALL BE MADE
IMMEDIATELY BY THE CONTRACTOR, WHO SHALL COMPARE IT WITH THE DRAWINGS AND SATISFY HIMSELF TO CONDITIONS UNDER WHICH WORK IS TO BE PERFORMED. HE SHALL AT SUCH TIME ASCERTAIN AND CHECK LOCATIONS OF THE EXISTING STRUCTURES AND EQUIPMENT WHICH MAY AFFECT HIS WORK. NO
ALLOWANCE SHALL BE MADE FOR ANY EXTRA EXPENSE TO WHICH HE MAY BE DUE BECAUSE OF FAILURE OR NEGLECT ON HIS PART TO MAKE SUCH EXAMINATIONS. ANY CONFLICTS OR OMISSIONS, ETC., SHALL BE REPORTED TO THE ARCHITECT BEFORE PROCEEDING WITH ANY WORK.
2. ANY ERRORS, OMISSIONS, OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE PROCEEDING WITH THE WORK.
3. WHERE REFERENCED IN NOTES, ARCHITECT SHALL BE FISCHER ARCHITECTURE, OWNER SHALL BE ANNE AND MICHAEL RAY.
4. CONTRACTOR SHALL PROVIDE ARCHITECT AND OWNER WITH A COMPLETE COST BREAKDOWN AND SCHEDULE OF CONSTRUCTION FOR THIS PROJECT PRIOR TO COMMENCEMENT OF WORK.
5. CONTRACTOR SHALL PROTECT NEW MATERIALS AND FINISHES FROM DAMAGE WHICH MAY OCCUR FROM CONSTRUCTION, DEMOLITION, DUST, WATER. ETC., AND SHALL PROVIDE AND MAINTAIN TEMPORARY BARRICADES, CLOSURE WALLS. ETC., AS REQUIRED TO PROTECT THE PUBLIC AS REQUIRED DURING THE PERIOD OF CONSTRUCTION. DAMAGE TO NEW MATERIALS, FINISHES, STRUCTURES, AND EQUIPMENT SHALL BE REPAIRED OR REPLACED. CONTRACTOR SHALL COORDINATE TEMPORARY BARRICADES WITH ARCHITECT AND / OR OWNER PRIOR TO COMMENCEMENT OF WORK.
6. ALL CONSTRUCTION WORK, IS TO COMPLY WITH THE 2019 CALIFORNIA BUILDING, RESIDENTIAL,
MECHANICAL, ELECTRICAL, PLUMBING, ENERGY , HISTORICAL, EXISTING AND GREEN BUILDING STANDARDS CODE AS AMENDED BY THE CITY OF SAN FRANCISCO, AND AS APPLICABLE. [CAC 1-201(a)] ALL
WORK SHALL BE DONE IN A THOROUGH, WORKMANLIKE MANNER AND EQUAL TO THE BEST STANDARDS OF THE PRACTICE.
7. ALL WORK LISTED, SHOWN OR IMPLIED ON ANY CONSTRUCTION DOCUMENT SHALL BE SUPPLIED AND INSTALLED BY THE CONTRACTOR EXCEPT WHERE NOTED. THE CONTRACTOR SHALL CLOSELY COORDINATE
HIS WORK WITH THAT OF OTHER CONTRACTORS OR VENDORS TO ASSURE THAT ALL SCHEDULES ARE MET AND THAT ALL WORK IS DONE IN CONFORMANCE TO MANUFACTURERS REQUIREMENTS. WORK REQUIRED UNDER THIS CONTRACT SHALL INCLUDE ALL LABOR, MATERIALS, EQUIPMENT, ETC., NECESSARY TO COMPLETE THIS PROJECT. ALL MATERIALS SHALL BE NEW AND UNUSED, UNLESS SPECIFICALLY NOTED, AND BE OF A QUALITY ACCEPTABLE BY INDUSTRY STANDARDS.
8. THE USE OF THE WORD "PROVIDE" IN CONNECTION WITH ANY ITEM SPECIFIED IS INTENDED TO MEAN
THAT SUCH ITEM SHALL BE FURNISHED, INSTALLED, AND CONNECTED WHERE SO REQUIRED, EXCEPT AS NOTED.
9. THE CONTRACTOR SHALL MAINTAIN A CURRENT AND COMPLETE SET OF CONSTRUCTION DOCUMENTS
ON THE JOB SITE DURING ALL PHASES OF CONSTRUCTION FOR USE OF ALL TRADES AND SHALL PROVIDE ALL SUBCONTRACTORS WITH CURRENT CONSTRUCTION DOCUMENTS AS REQUIRED. THE CONTRACTOR, IN
ASSUMING RESPONSIBILITY FOR THE WORK INDICATED, SHALL COMPLY WITH THE LETTER IN WHICH THEY WERE DRAWN.
10. THE CONTRACTOR SHALL REMOVE ALL RUBBISH AND WASTE MATERIALS OF ALL SUBCONTRACTORS
AND TRADES ON A REGULAR BASIS, AND SHALL EXERCISE STRICT CONTROL OVER JOB CLEANING TO
PREVENT ANY DIRT, DEBRIS OR DUST FROM AFFECTING IN ANY WAY , FINISHED AREAS IN OR OUTSIDE THE JOB SITE.
11. THE CONSTRUCTION DOCUMENTS ARE PROVIDED TO ILLUSTRATE THE DESIGN INTENT AND GENERAL TYPE OF CONSTRUCTION DESIRED.
12. DETAILS SHOWN ARE TYPICAL U.O.N. SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS.
13. ALL ELECTRICAL, MECHANICAL, AND PLUMBING WORK AND MATERIALS SHALL BE IN FULL
ACCORDANCE WITH THE LATEST RULES AND REGULATIONS OF THE NATIONAL BOARD OF FIRE
UNDERWRITERS, THE STATE FIRE MARSHALL, THE SAFETY ORDERS OF THE DIVISION OF INDUSTRIAL SAFETY , AND ANY APPLICABLE STATE OR LOCAL LAWS AND ORDINANCE. NOTHING ON THESE DRAWINGS IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE CODES. ANY QUESTIONS REGARDING INSTALLATIONS SHALL BE BROUGHT TO THE ARCHITECT FOR CLARIFICATION.
14. INSTALL BATT INSULATION PER T24 AND CAL ENERGY CODE BETWEEN STUDS AND JOISTS AT ALL EXTERIOR WALLS, CEILINGS, AND FLOORS WHERE EXPOSED.
15. ALL DIMENSIONS ON CONSTRUCTION DRAWINGS ARE TO FACE OF FINISH UNLESS NOTED AS BEING TO FACE OF FRAMING. DIMENSIONS ARE TO BOTTOM OF FINISHED CEILING OR TOP OF FINISHED FLOOR IN INTERIOR ELEVATIONS UNLESS OTHERWISE NOTED.
16. ALL DIMENSIONS TAKE PRECEDENCE OVER SCALE. ANY DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE ARCHITECT. CONTRACTOR SHALL NOT SCALE DRAWINGS.
QUESTIONS REGARDING DIMENSIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO ANY START OF WORK.
17. WINDOW AND DOOR SIZES ARE NOMINAL DIMENSIONS. REFER TO MANUFACTURER FOR ACTUAL ROUGH OPENING SIZES.
18. NOT USED.
19. NOT USED.
20. SEALANT, CAULKING, AND FLASHING, ETC., LOCATIONS SHOWN ON DRAWINGS ARE NOT INTENDED TO BE INCLUSIVE. FOLLOW MANUFACTURER’S INSTALLATION RECOMMENDATIONS AND STANDARD INDUSTRY AND BUILDING PRACTICES.
21. PROVIDE SOLID WOOD BACKING FOR ALL SURFACE MOUNTED ACCESSORIES.
22. ALL WORK SHALL BE GUARANTEED AGAINST DEFECTS IN DESIGN, INSTALLATION AND MATERIAL FOR A MINIMUM PERIOD OF ONE YEAR FROM DATE OF COMPLETION.
23. ALL MATERIALS FOR USE ON THE PROJECT SHALL BE STORED WITHIN THE PROJECT SITE.
24. CONTRACTOR SHALL PERSONALLY SUPERVISE AND DIRECT THE WORK OR SHALL KEEP A COMPETENT EMPLOYEE, AUTHORIZED TO RECEIVE INSTRUCTIONS AND ACT ON THE CONTRACTOR’S BEHALF , CONTINUOUSLY ON SITE DURING WORKING HOURS.
25. ALL QUESTIONS REGARDING PROJECT EITHER DURING BIDDING PHASE OR DURING CONSTRUCTION SHALL BE DIRECTED TO THE ARCHITECT IN WRITING BY EMAIL: [email protected]
26. DEMOLITION: THE CONTRACTOR SHALL ENTIRELY DEMOLISH AND REMOVE FROM SITE ANY STRUCTURE OR PORTION THEREOF , OR SITE FEATURE INDICATED TO BE REMOVED.
27. SALVAGE & RECYCLING: ALL ITEMS DEEMED SALVAGEABLE OR RECYCLABLE BY THE OWNER WILL
EITHER HAVE BEEN INDICATED ON THE DRAWINGS, REMOVED PRIOR TO THE START OF DEMOLITION, OR
WILL BE DIRECTED BY THE OWNER TO BE STORED BY THE CONTRACTOR AND SHALL REMAIN THE PROPERTY OF THE OWNER. ITEMS TO BE RELOCATED WILL HAVE BEEN INDICATED ON THE DRAWINGS.
REFER TO CITY RECYCLING AND SALVAGING REQUIREMENTS ON FOLLOWING PAGES.
28. DESIGN BUILD: ALL ELECTRICAL, MECHANICAL, AND PLUMBING WORK SHALL BE DESIGN BUILD BASED ON THE INFORMATION PROVIDED IN THE CONSTRUCTION DOCUMENTS.
29. THE CONTRACTOR SHALL SUBMIT A LIST OF PAINTS, PRIMERS, SEALANTS, CAULKING, AND ADHESIVES INSTALLED WITHIN THE INTERIOR OF THE BUILDING. LIST TO INCLUDE MATERIAL TYPE (PER CALGREEN TABLES 4.504.1 AND 4.504.3) MANUFACTURER NAME, MODEL NAME/NUMBER, VOC AMOUNT, AND CALGREEN VOC NOT TO EXCEED LIMIT PER PRODUCT.
30. PROJECT CLOSEOUT:
A. CONTRACTOR SHALL REVIEW PROJECT WITH ARCHITECT AND/OR OWNER TO ENSURE THAT ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS HAVE BEEN FOLLOWED.
B. CONTRACTOR SHALL OBTAIN ALL REQUIRED CERTIFICATES AND NOTICES.
C. ALL WORK PERFORMED SHALL BE CLEAN AND READY FOR USE.
D. UPON SUBSTANTIAL COMPLETION, THE ARCHITECT SHALL, AT THE CONTRACTOR’S WRITTEN REQUEST, COMPILE A PROJECT PUNCH LIST NOTING ANY CORRECTIONS OR OMISSIONS. ARCHITECT'S ACCEPTANCE WILL BE CAUSE FOR FINAL PAYMENT, UNLESS SPECIFICALLY DETERMINED OTHERWISE BY OWNER.
GENERAL CONTRACTOR
Oliver Builders Inc.
1031 Pardee St,
Berkeley, CA 94710
tel. 510.527.5171
Severin Oliver, Contractor
STRUCTURAL ENGINEER
Berkeley Structural Design
1411 Glendale Ave
tel. 510.981.1016
Berkeley, CA 94708
Bill Lynch, Engineer
ply plywood
ptd painted
r radius
req'd required
r.o. rough opening
s.s.d. see structural drawings
s.c.d. see civil drawings
s.l.d. see lanscape drawings
sim similar
st. stl. stainless steel
st. steel
std standard
(t) tempered glass
t.b.d. to be determined
thru through
t.o. top of
typ. typical
ver verify
v.i.f. verify in field
w.o. where occurs
u.o.n. unless otherwise noted
UP up
PROJECT INFORMATION
VICINITY MAP
PROJECT TEAM
SHEET INDEX
Architectural Drawings
A0.0 Cover
A0.1 Project Info
A0.2 BMP
A0.3 Site/Roof Plan and Photos
A1.0 Existing/Demo Plans
A1.1 Existing/Demo Elevations
A2.0 Proposed Floor Plans
A3.0 Proposed Elevations
A3.1 Proposed Elevations - Illustrative
Interior remodel of the kitchen, breakfast area, office nook, powder room, primary bed/bath suite, and secondary bathroom. Exterior work comprises a reconfiguration of window locations on north elevation on the main and upper levels; the addition of a window and the relocation of a window at the basement level on the north elevation; the addition of two skylights on the roof; and the replacement of a bedroom window on the east elevation. Exterior changes to historic characteristic features are limited to two windows on the west elevation, which will be enlarged but retain the same center post, and one window on the south elevation, which will be moved to be centered on the dormer ridgeline and reduced by 4” in height by raising the sill to coordinate with the adjacent roof. Exterior finishes will be replaced in-kind where damage has occurred.
subject property
N
Office
101
1/A6.0
A
B
C
D
1 1/A0.0
100
+height
text
1 A
10.5.2023 Structural Alterations KF/AJ
Materials storage & spill cleanup
Non-hazardous materials management
4 Sand, dirt, and similar materials must be stored at least 10 feet from catch basins, and covered with a tarp during wet weather or when rain is forecast. 4 Use (but don’t overuse) reclaimed water for dust control as needed. 4 Sweep streets and other paved areas daily. Do not wash down streets or work areas with water!
4 Recycle all asphalt, concrete, and aggregate base material from demolition activities.
4 Check dumpsters regularly for leaks and to make sure they don’t overflow.
Repair or replace leaking dumpsters promptly.
Hazardous materials management
4 Label all hazardous materials and hazardous wastes (such as pesticides, paints, thinners, solvents, fuel, oil, and antifreeze) in accordance with city, state, and federal regulations.
4 Store hazardous materials and wastes in secondary containment and cover them during wet weather.
4 Follow manufacturer’s application instructions for hazardous materials and be careful not to use more than necessary. Do not apply chemicals outdoors when rain is forecast within 24 hours.
4 Be sure to arrange for appropriate disposal of all hazardous wastes.
Spill prevention and control
4 Keep a stockpile of spill cleanup materials (rags, absorbents, etc. ) available at the construction site at all times.
4 When spills or leaks occur, contain them immediately and be particularly care- ful to prevent leaks and spills from reaching the gutter, street, or storm drain.
Never wash spilled material into a gutter, street, storm drain, or creek! 4 Report any hazardous materials spills immediately! Dial 911 or your local emer- gency response number.
Vehicle and equipment
maintenance & cleaning
4 Inspect vehicles and equipment for leaks
frequently. Use drip pans to catch leaks
until repairs are made; repair leaks
promptly.
4 Fuel and maintain vehicles on site only
in a bermed area or over a drip pan that
is big enough to prevent runoff.
4 If you must clean vehicles or equipment
on site, clean with water only in a
bermed area that will not allow
rinsewater to run into gutters, streets,
storm drains, or creeks.
4 Do not clean vehicles or equipment
on-site using soaps, solvents, degreasers,
steam cleaning equipment, etc.
Dewatering
operations
4 Reuse water for dust control, irrigation,
or another on-site purpose to the greatest
extent possible.
4 Be sure to call your city’s storm drain
inspector before discharging water to a
street, gutter, or storm drain. Filtration or diversion through a basin, tank, or sediment trap may be required.
4 In areas of known contamination, testing is required prior to reuse or discharge of groundwater. Consult with the city inspector to determine what testing to do and to interpret results. Contaminated groundwater must be treated or hauled off-site for proper disposal.
Concrete, grout, and mortar
storage & waste disposal
4 Be sure to store concrete, grout, and mortar under cover and away from drainage areas. These materials must never reach a storm drain.
4 Wash out concrete equipment/trucks off-site or designate an on-site area for washing where water will flow onto dirt or into a temporary pit in a dirt area. Let the water seep into the soil and dispose of hardened concrete with trash.
Make sure your crews and subs do the job right!
Storm drain polluters may be liable for fines of $10,000 or more per day! Runoff from streets and other paved areas is a major source of pollution in San Francisco Bay. Construction activities can directly affect the health of the Bay unless contractors and crews plan ahead to keep dirt, debris, and other construction waste away from storm drains and local creeks. Following these guidelines will ensure your compliance with local ordinance requirements.
4 Divert water from washing
exposed aggregate concrete
to a dirt area where it will
not run into a gutter, street,
or storm drain.
4 If a suitable dirt area is not
available, collect the wash
water and remove it for
appropriate disposal off site.
Earthwork & contaminated soils
4 Keep excavated soil on the site where it is least likely to collect in the street.
Transfer to dump trucks should take place on the site, not in the street. 4 Use fiber rolls, silt fences, or other control measures to minimize the flow of silt off the site.
Paving/asphalt work
Saw cutting
4 Always completely cover or barricade storm drain inlets when saw cutting. Use filter fabric, catch basin inlet filters, or sand/gravel bags to keep slurry out of the storm drain system.
4 Shovel, absorb, or vacuum saw-cut slurry and pick up all waste as soon as you are finished in one location or at the end of each work day (whichever is sooner!).
4 If saw cut slurry enters a catch basin, clean it up immediately. 4 Do not pave during wet weather or when
rain is forecast.
4 Always cover storm drain inlets and man-
holes when paving or applying seal coat,
tack coat, slurry seal, or fog seal.
4 Place drip pans or absorbent material un-
der paving equipment when not in use.
4 Protect gutters, ditches, and drainage
courses with sand/gravel bags, or earthen
berms.
4 Do not sweep or wash down excess sand
from sand sealing into gutters, storm drains, or creeks. Collect sand and return it to the stockpile, or dispose of it as trash.
4 Do not use water to wash down fresh asphalt concrete pavement.
Painting
4 Never rinse paint brushes or
materials in a gutter or street!
4 Paint out excess water-based
paint before rinsing brushes,
rollers, or containers in a sink.
If you can’t use a sink, direct
wash water to a dirt area and
spade it in.
4 Paint out excess oil-based paint before cleaning brushes in thinner. 4 Filter paint thinners and solvents for reuse whenever possible.
Dispose of oil-based paint sludge and unusable thinner as hazardous waste.
4 Avoid scheduling earth moving activities
during the rainy season if possible. If
grading activities during wet weather
are allowed in your permit, be sure to
implement all control measures necessary
to prevent erosion.
4 Mature vegetation is the best form of
erosion control. Minimize disturbance to
existing vegetation whenever possible.
4 If you disturb a slope during construction,
prevent erosion by securing the soil with
erosion control fabric, or seed with fast-
growing grasses as soon as possible. Place
fiber rolls down-slope until soil is secure.
4 If you suspect contamination (from site history, discoloration, odor, texture, abandoned underground tanks or pipes, or buried debris), call the Regional Water Quality Control Board or local hazardous waste management agency for help in determining what testing should be done, and manage disposal of contaminated soil according to their instructions.
Bay Area Stormwater Management
Agencies Association (BASMAA)
1-888-BAYWISE
Pollution Prevention — It’s Part of the Plan
For more detailed information:
Get a copy of the “Field Manual” — (510) 622-2465 or
www.abag.ca.gov/bayarea/sfep/reports/construction.html
SHEET
DESCRIPTION
REV. DATE ISSUE DRWN.
2119 Marin Ave
Berkeley, CA 94707
APN: 061 258400300
RAY RESIDENCE
NOTES:
SITE/ROOF PLANS AND PHOTOS
SCALE : 1/8" = 1'-0"
A0.3
1. PROPOSED SITE/ROOF PLAN
SCALE: 1/8" = 1'-0"
0 4 8 16
(e) Residence
(e) Garage
Marin Ave
(e) fence
(e) landscaping
(e) stone wall
(e) paved patio
dn
dndn
(e) landscaping
(e) landscaping
(e) landscaping
(e) landscaping
(e) paving
(e) paving
(e) landscaping
(e) landscaping
dn
(e) landscaping
(e) landscaping
(e) landscaping
(e) landscaping
(e) landscaping (e) landscaping
(e) paving
(e) landscaping
(e) firepit
(e) landscaping (e) landscaping
(e) conc driveway
(e) landscaping
(e) paving
dn
dn
dn
(e) fence
(e) conc wall
(e) fence
dn
dn
dn
dn
dndn
dn
(e) paving
(e) paving
dn
dn
dn
dn
dn
(e) paving
(e) paving
sidewalk
(e) landscaping (e) landscaping
(e) retaining wall
12:1212:12
2:12
12:1212:12
7:12
7:12
6:12
13:12
11:12
12:12
4:12
12:12
13:12 13:12
13:12
13:12 13:12
12:12
11:12
7:12
(n)
skylight
(n)
skylight
(e) skylight to
be replaced
APN 61-2584-4 APN 61-2584-3
125.8'
37.65'
33.93'
64.73'
41'
41.5'
40'56.02'
20'-0"
rear setback
4'-0"
side setback
20'-0"
front setback
4'-0"
side setback
20'-0"
rear setback
4'-0"
side setback
4'-0"
side setback
23'-2"
28'-0"
33'-5"
54'-7"
3'-10"
(e) wall-mounted
floodlight to be replaced
7:12
(n) roof, flashings, and downspouts to
replace (e) non-historic comp roof shingles;
(n) comp roof shingles to be GAF Timberline
UHDZ in Weathered Wood
(n) brick landing &
step to patio
4'-0"
side setback
4'-0"
side setback
2. EXISTING HOUSE PHOTO - SOUTH ELEVATION
3. WEST ELEVATION
4. EXISTING HOUSE PHOTO - NORTH ELEVATION5A. EAST ELEVATION FROM NORTH SIDE
6. EXISTING GARAGE PHOTO - SOUTH ELEVATION7. WEST ELEVATION
8. NORTH ELEVATION9. EAST ELEVATION
5B. EAST ELEVATION FROM SOUTH SIDE
N
10.5.2023 Structural Alterations KF/AJ
SHEET
DESCRIPTION
REV. DATE ISSUE DRWN.
2119 Marin Ave
Berkeley, CA 94707
APN: 061 258400300
RAY RESIDENCE
NOTES:
EXISTING/ DEMO FLOOR PLANS
SCALE : 1/4" = 1'-0"
A1.0
Hallway
Family Room
Breakfast
Living Room
Dining Room
Kitchen
1 4 '-3 "
up
dn
Covered
Porch
Porch
DW
(e) built-in
Powder
salvage (e) built-in
and reinstall in
adjacent corner
salvage (e) doors
for reuse, typ
demolish (e) exterior finishes only,
framing to remain
demo brick landing and steps
demo steps, railings
demo all fixtures, finishes,
salvage for donation where
possible
salvage (e) door
and trim, relocate
demo all fixtures, finishes, salvage
for donation where possible
salvage (e)
door, reverse
swing
demo all fixtures,
finishes, salvage
for donation where
possible
Primary Bedroom
Bedroom
Bedroom
Primary
Bathroom
Bathroom
Bedroom
remove wall for
(n) window
2. EXISTING/DEMO MAIN LEVEL PLAN
SCALE: 1/4" = 1'-0"
3. EXISTING/DEMO UPPER LEVEL PLAN
SCALE: 1/4" = 1'-0"
N
WD
WH
FURN
Basement
Laundry
up
up
remove wall for
(n) window
1. EXISTING/DEMO BASEMENT PLAN
SCALE: 1/4" = 1'-0"
10.5.2023 Structural Alterations KF/AJ
0 2 4 8
SHEET
DESCRIPTION
REV. DATE ISSUE DRWN.
2119 Marin Ave
Berkeley, CA 94707
APN: 061 258400300
RAY RESIDENCE
NOTES:
DEMO/EXISTING ELEVATIONS
SCALE : 1/4" = 1'-0"
A1.1
SOUTHWEST
remove historic lap siding where
damaged, replace with new to
match (e), this elevation
remove non-historic roofing, flashings,
downspouts
remove non-historic wood lean-to
remove damaged historic shingles, typ.
remove non-historic obsoete
ductwork
remove (e) non-historic
exterior stair
remove historic window and
wall for (n) window
major ridge
bedroom ceiling finish
upper level finish floor
family room ceiling finish
main level finish floor
11"
8'-11"
11"
1'-2"
5'-10"
1978 non-historic addition
1978 non-historic addition
1. DEMO/EXISTING EAST ELEVATION
SCALE: 1/4" = 1'-0"
3. DEMO/EXISTING WEST ELEVATION
SCALE: 1/4" = 1'-0"
NORTHEAST
remove historic window
remove (e)
non-historic
siding in area
of new workremove (e)
non-historic
stair and
railing
major ridge
bedroom ceiling finish
upper level finish floor
family room ceiling finish
main level finish floor
breakfast finish floor
1978 non-historic addition
1978 non-historic additionremove non-original shed roof remove damaged
historic shingles, typ.
remove (e) gutter
major ridge
bedroom ceiling finish
upper level finish floor
family room ceiling finish
main level finish floor
remove (e) damaged
historic wood stair
remove historic window
and wall for (n) window
NORTHWEST
major ridge
bedroom ceiling finish
upper level finish floor
family room ceiling finish
main level finish floor
basement finish floor
demo non-historic
openings and exterior
finish material on 1978
non-historic addition
remove (e) non-historic
exterior stair
remove non-historic obsolete ductwork
remove non-historic skylight
remove non-historic roofing, flashings,
downspouts
remove
non-historic
wood lean-to
remove historic wall for
(n) window
breakfast finish floor
1978 non-historic addition
2. DEMO/EXISTING SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
4. DEMO/EXISTING NORTH ELEVATION
SCALE: 1/4" = 1'-0"
10.5.2023 Structural Alterations KF/AJ
0 2 4 8
SHEET
DESCRIPTION
REV. DATE ISSUE DRWN.
2119 Marin Ave
Berkeley, CA 94707
APN: 061 258400300
RAY RESIDENCE
NOTES:
PROPOSED FLOOR PLANS
SCALE : 1/4" = 1'-0"
N
A2.0
Hallway
Family Room
Breakfast
Living Room
Dining Room
Kitchen
1 4 '-3 "
up
dn
Covered
Porch
Porch
(e) built-in
Powder
sink
built in desk
48" range
36" rfrg
raise floor
D
(n) porch
(n) parapet walls to
match (e) at entry
with steel handrail
(n) pocket door,
modify (e) swing door
(e) door, (n) location
(n) French doors, sidelight
2'-3"
2'-2"
books
D
uppersuppers
uppers
tall
table 40" x 96"
54" dia.
saddle
saddle
saddle
5'-4 3/4"
2'-2"
(e) stone edging
(e) brick (e) paving
(e)
landscaping
(e) planting bed
(e) landscaping
(e) paving
(e) paving
(e) landscaping
(e) landscaping
(e) planting bed
(e) paving
(n) plant.
(n) plant.
(n) plant.
(n) brick
landing &
step to patio
(e) landscaping
Primary Bedroom
Bedroom
Bedroom
Primary
Bathroom
Bathroom
Bedroom
Hallway
DN
DN
14'-8"2'-4"
cust.med cabs.
tile
wood
36"
7'-0"
med.
relocated
access door
(n) operable
skylight,
match (e) size
and location
mirror mirror
built in
shelving
dresser
Dressing
(n) operable skylight shown
projected on sloped ceiling,
see schedule for size,
location tbd
(e) soffit
(n) tile floor, (n) tile
wainscot 80", (n) gyp
board walls
(n) window,
awning
(egress)reuse (e) door
(n) windows
fur wall at
med cabs
(n) door, reuse
salvaged door if
possible
3'-10"
2. PROPOSED MAIN LEVEL PLAN
SCALE: 1/4" = 1'-0"
3. PROPOSED UPPER LEVEL PLAN
SCALE: 1/4" = 1'-0"
1. PROPOSED BASEMENT PLAN
SCALE: 1/4" = 1'-0"
WD
WH
FURN
Basement
Laundry
up
up
10.5.2023 Structural Alterations KF/AJ
0 2 4 8
SHEET
DESCRIPTION
REV. DATE ISSUE DRWN.
2119 Marin Ave
Berkeley, CA 94707
APN: 061 258400300
RAY RESIDENCE
NOTES:
PROPOSED ELEVATIONS
SCALE : 1/4" = 1'-0"
A3.0
(n) operable skylights
(n) operable skylight
to replace (e)
major ridge
bedroom ceiling finish
upper level finish floor
family room ceiling finish
main level finish floor
basement finish ceiling
basement finish floor
(n) wood casement
windows, painted blue gray,
sashes & casings match (e)
historic
(n) French doors and
sidelight, wood, painted
blue gray, casings match
(e) historic
(n) parapet wall and
handrail each side of (n)
stair, match entry stair,
painted lap siding
painted wood treads
and risers at (n) stair
(n) lap siding, 6x
(n) roof, flashings, and downspouts to
replace (e) non-historic comp roof shingles;
(n) comp roof shingles to be GAF
Timberline UHDZ in Weathered Wood
replace all downspouts, round,
painted, typ.
(e) historic shingles at north
elev, repair as needed, paint
(n) glass awning over
painted wood
brackets to match
soffit brackets at west
south porch
(n) fixed wood window, painted
blue gray, match (e) historic details
(n) lap siding where
irreparable, match (e)
historic, painted
(n) wood shingles to
match (e), painted
(n) stepped parapet
wall w/ 6x lap siding
line of (n) stairs
beyond
(e) conc. patio
(n) conc. step
(n) roof, flashings, and downspouts to
replace (e) non-historic comp roof shingles;
(n) comp roof shingles to be GAF Timberline
UHDZ in Weathered Wood
replace all downspouts, round,
painted weathered brown gray,
typ.
(n) glass awning over
painted wood
brackets to match
soffit brackets at west
south porch
(n) double hung wood
windows to align with (e)
windows below, painted
blue gray, window sashes
& casings to match (e)
historic details
(n) wall sconce
5'-10"
8'-11"
5" 5"
8" 5"
2 1/4" 2 1/4"
2 1/4" 2 1/4"
8'-5"
4'-0"23"
typ.
6'-3"
2'-4"
1'-11"
1'-4"
3'-10"
2'-8"
1978 non-historic addition
1978 non-historic addition
1978 non-historic addition
(n) operable skylight
to replace (e)
non-historic
(n) operable skylight
(n) roof, flashings, and downspouts to
replace (e) non-historic comp roof shingles;
(n) comp roof shingles to be GAF Timberline
UHDZ in Weathered Wood
replace all downspouts, round,
painted, typ.
repair (e) historic lap
wood siding, paint
(n) lap wood siding,
6x, paint, see detail
6 for profile
(n) stepped parapet
wall w/ 6x lap siding,
see detail 6 for profile
line of (n) stairs
beyond
(n) wood awning window to
match divisions and details of
(e) historic double hung, to
improve bedroom egress
(n) glass awning over
painted wood brackets to
match soffit brackets at
west south porch
1978 non-historic addition
1978 non-historic addition
1. PROPOSED EAST ELEVATION
SCALE: 1/4" = 1'-0"
4. PROPOSED NORTH ELEVATION
SCALE: 1/4" = 1'-0"
recreate scooped
wood shingle roof
per historical
photos, painted
(n) wood shingles,
match (e), painted
weathered brown
gray, typ
(n) larger gutter
replace all downspouts, round, painted
weathered brown gray, typ.
major ridge
bedroom ceiling finish
upper level finish floor
family room ceiling finish
main level finish floor
(n) roof, flashings, and downspouts to
replace (e) non-historic comp roof shingles;
(n) comp roof shingles to be GAF
Timberline UHDZ in Weathered Wood
(n) stair to match (e), wood
treads and risers, painted
weathered brown gray
repair (e) historic lap wood
siding, painted weathered
brown gray, typ
(n) pendant to replace (e)
pendant
3 (n) wall sconces
3'-0"
3'-8"
(n) double hung wood
window, painted blue
gray, window sashes &
casings to match (e)
historic details
3. PROPOSED WEST ELEVATION
SCALE: 1/4" = 1'-0"
2. PROPOSED SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
10.5.2023 Structural Alterations KF/AJ
WINDOW NOTE:
Repair existing wood windows
or, where irreparable, selectively
replace with new wood windows
to mach existing including upper
sash drops/ears at double hung
windows. Paint (n) and (e)
frames and sashes blue gray,
similarly to color commonly seen
in First Bay Tradition
architecture
LAP SIDING & WOOD TRIMS
NOTE:
Repair existing where feasible,
replace to match existing where
irreparable, paint all weathered
brown gray
1. Additional information regarding composition shingle selection:
in order to address the Mills Act work plan to provide new "composition roof shingles visually similar to original/early wood roof shingles, including ridgeline and hipline shingles, ” the selected comp. shingle product was chosen to provide for the serrated roof ridge and hip profile associated with wood shingle.
Based on historic photos, the original roof was straight-cut wood shingles, not shakes, and which were first replaced with comp. shingles in 1958.
2. Additional information regarding windows: all new double hung windows will be detailed to match the historic windows. They will have the same sash member dimensions, same casing detail, with lugs at the double hung condition. The new windows at the 1978 addition will be detailed similarly, but without lugs, as those are not double hung (see elevation 4). See elevations for dimensions for each opening.
+/- 3/8" 9"
5. EXISTING SIDING PROFILE
SCALE: 3" = 1'-0" 5 1/2"
+/- 1/2"
6. PROPOSED 6X SIDING PROFILE
SCALE: 3" = 1'-0"
0 2 4 8
SHEET
DESCRIPTION
REV. DATE ISSUE DRWN.
2119 Marin Ave
Berkeley, CA 94707
APN: 061 258400300
RAY RESIDENCE
NOTES:
PROPOSED ELEVATIONS - ILLUSTRATIVE
SCALE : 1/4" = 1'-0"
A3.1
(n) operable skylights
(n) operable skylight
to replace (e)
major ridge
bedroom ceiling finish
upper level finish floor
family room ceiling finish
main level finish floor
basement finish ceiling
basement finish floor
(n) wood casement
windows, painted blue gray,
sashes & casings match (e)
historic
(n) French doors and
sidelight, wood, painted
blue gray, casings match
(e) historic
(n) parapet wall and
handrail each side of (n)
stair, match entry stair,
painted lap siding
painted wood treads
and risers at (n) stair
(n) lap siding, 6x
(n) roof, flashings, and downspouts to
replace (e) non-historic comp roof shingles;
(n) comp roof shingles to be GAF
Timberline UHDZ in Weathered Wood
replace all downspouts, round,
painted, typ.
(e) historic shingles at north
elev, repair as needed, paint
(n) glass awning over
painted wood
brackets to match
soffit brackets at west
south porch
(n) fixed wood window, painted
blue gray, match (e) historic details
(n) lap siding where
irreparable, match (e)
historic, painted
(n) wood shingles to
match (e), painted
(n) stepped parapet
wall w/ 6x lap siding
line of (n) stairs
beyond
(e) conc. patio
(n) conc. step
(n) roof, flashings, and downspouts to
replace (e) non-historic comp roof shingles;
(n) comp roof shingles to be GAF Timberline
UHDZ in Weathered Wood
replace all downspouts, round,
painted weathered brown gray,
typ.
(n) glass awning over
painted wood
brackets to match
soffit brackets at west
south porch
(n) double hung wood
windows to align with (e)
windows below, painted
blue gray, window sashes
& casings to match (e)
historic details
(n) wall sconce
5'-10"
8'-11"
5" 5"
8" 5"
2 1/4" 2 1/4"
2 1/4" 2 1/4"
8'-5"
4'-0"23"
typ.
6'-3"
2'-4"
1'-11"
1'-4"
3'-10"
2'-8"
1978 non-historic addition
1978 non-historic addition
1978 non-historic addition
(n) operable skylight
to replace (e)
non-historic
(n) operable skylight
(n) roof, flashings, and downspouts to
replace (e) non-historic comp roof shingles;
(n) comp roof shingles to be GAF Timberline
UHDZ in Weathered Wood
replace all downspouts, round,
painted, typ.
repair (e) historic lap
wood siding, paint
(n) lap wood siding,
6x, paint, see detail
6 for profile
(n) stepped parapet
wall w/ 6x lap siding,
see detail 6 for profile
line of (n) stairs
beyond
(n) wood awning window to
match divisions and details of
(e) historic double hung, to
improve bedroom egress
(n) glass awning over
painted wood brackets to
match soffit brackets at
west south porch
1978 non-historic addition
1978 non-historic addition
1. PROPOSED EAST ELEVATION
SCALE: 1/4" = 1'-0"
4. PROPOSED NORTH ELEVATION
SCALE: 1/4" = 1'-0"
recreate scooped
wood shingle roof
per historical
photos, painted
(n) wood shingles,
match (e), painted
weathered brown
gray, typ
(n) larger gutter
replace all downspouts, round, painted
weathered brown gray, typ.
major ridge
bedroom ceiling finish
upper level finish floor
family room ceiling finish
main level finish floor
(n) roof, flashings, and downspouts to
replace (e) non-historic comp roof shingles;
(n) comp roof shingles to be GAF
Timberline UHDZ in Weathered Wood
(n) stair to match (e), wood
treads and risers, painted
weathered brown gray
repair (e) historic lap wood
siding, painted weathered
brown gray, typ
(n) pendant to replace (e)
pendant
3 (n) wall sconces
3'-0"
3'-8"
(n) double hung wood
window, painted blue
gray, window sashes &
casings to match (e)
historic details
3. PROPOSED WEST ELEVATION
SCALE: 1/4" = 1'-0"
2. PROPOSED SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
WINDOW NOTE:
Repair existing wood windows
or, where irreparable, selectively
replace with new wood windows
to mach existing including upper
sash drops/ears at double hung
windows. Paint (n) and (e)
frames and sashes blue gray,
similarly to color commonly seen
in First Bay Tradition
architecture
LAP SIDING & WOOD TRIMS
NOTE:
Repair existing where feasible,
replace to match existing where
irreparable, paint all weathered
brown gray
1. Additional information regarding composition shingle selection:
in order to address the Mills Act work plan to provide new "composition roof shingles visually similar to original/early wood roof shingles, including ridgeline and hipline shingles, ” the selected comp. shingle product was chosen to provide for the serrated roof ridge and hip profile associated with wood shingle.
Based on historic photos, the original roof was straight-cut wood shingles, not shakes, and which were first replaced with comp. shingles in 1958.
2. Additional information regarding windows: all new double hung windows will be detailed to match the historic windows. They will have the same sash member dimensions, same casing detail, with lugs at the double hung condition. The new windows at the 1978 addition will be detailed similarly, but without lugs, as those are not double hung (see elevation 4). See elevations for dimensions for each opening.
+/- 3/8" 9"
5. EXISTING SIDING PROFILE
SCALE: 3" = 1'-0" 5 1/2"
+/- 1/2"
6. PROPOSED 6X SIDING PROFILE
SCALE: 3" = 1'-0"
10.5.2023 Structural Alterations KF/AJ
0 2 4 8
Attachment 1, Part 4
Millions of families have found shelter
under a beautiful, durable, Timberline ®
roof. Now, Timberline
®
UHDZ ™ shingles
offer a combination of beauty and
benefits that goes beyond any
Timberline
® shingles available before.
We protect what matters most
™
gaf.com/uhdz©2023 GAF • RESUHD101-0223 415204-0223
Exhibit A
Weathered
Wood
The perfect neutral color, Weathered Wood complements a broad range of hues and works well with sage, cream, ivory, and beige.
Note: It is difficult to reproduce the color clarity and actual color blends of these products. Before selecting your color, please ask to see several full-size shingles.
Exhibit A
Leak Barrier
Helps prevent leaks
caused by wind-driven
rain and ice dams
1 Lifetime Shingles †
Beautify and protect
for years to come
4 Ridge Cap Shingles
The finishing touch that
helps defend against leaks
at the hips and ridges
6 Starter Strip Shingles
Helps guard against
shingle blow-offs
3 Roof Deck Protection
Helps shield the roof
deck from moisture
infiltration
2 Cobra ® Attic Ventilation
Helps reduce attic
moisture and heat
5 The GAF Lifetime
†
Roofing System
Install any GAF Lifetime † Shingle and
at least 3 qualifying GAF Accessories
and get a Lifetime † limited warranty
on your qualifying GAF products plus
non-prorated coverage for the first 10
years. For even stronger coverage, ask
your GAF factory-certified contractor
2 about enhanced GAF warranties.
LIFETIME
LIMITED
W ARRANTY TERM
†
† Lifetime refers to the length of warranty coverage provided and means as long as the original individual owner(s) of a single- family detached residence [or eligible second owner(s)] owns the property where the qualifying GAF products are installed.
For other owners/structures, Lifetime coverage is not applicable. Lifetime coverage on shingles requires the use of GAF Lifetim e Shingles only. See the GAF Shingle & Accessory Limited Warranty for complete coverage and restrictions. Visit gaf.com/LRS for qualifying GAF products. Lifetime coverage on shingles and accessories requires the use of any GAF Lifetime Shingle and at least 3 qualifying GAF Accessories. See the GAF Roofing System Limited Warranty for complete coverage and restrictions. For installations not eligible for the GAF Roofing System Limited Warranty , see the GAF Shingle & Accessory Limited Warranty . Visit gaf.com/LRS for qualifying GAF products .
1 Contractors enrolled in GAF certification programs are not employees or agents of GAF, and GAF does not control or otherwise supervise these independent businesses. Contractors may receive benefits, such as loyalty rewards points and discounts on marketing tools from GAF for participating in the program and offering GAF enhanced warranties, which require the use of a minimum amount of GAF products.
It’ s a system,
built to
protect
A Timberline
®
UHDZ ™ roof is so much more
than shingles. It’s layers of protection,
working together to help keep your home
safe from rain, snow, sun, and wind.
In fact, installing 4 qualifying GAF Accessories
— GAF starter strips, roof deck protection,
ridge cap shingles, and either leak barrier or
attic ventilation — in one roof system makes
Timberline
®
UHDZ ™ Shingles eligible for the
WindProven ™ limited wind warranty. 1
Visit gaf.com/LRS for qualifying GAF products.
1 15-year WindProven ™ limited wind warranty on Timberline ® UHDZ ™ Shingles requires the use of GAF starter strips, roof deck protection, ridge cap shingles, and leak barrier or attic ventilation. See GAF Roofing System Limited Warranty for complete coverage and restrictions. Visit gaf.com/LRS for qualifying GAF prod ucts. For installations not eligible for the WindProven ™ limited wind warranty, see GAF Shingle & Accessory Limited Warranty for complete coverage and restrictions. m uc h m o r e
t ection,
p your h ome
wind.
G AF Accessories
protection,
l ea k b arr i er or
s ystem makes
g ible f or the
r an t y .
1 Exhibit A
30 +DQJLQJ/DPS&RH6WXGLRV&RH6WXGLRV
KWWSV
FRHVWXGLRVFRPSURGXFWVVROLGEURQ]HKDQJLQJODPS 6\[KVVYSPNO[PUNMVYNHYKLUZ^HSR^H`ZHUKKYP]L^H`Z
/HUNPUN3HTW
0RGHO+/*/+/(1+/(6+/3/0RGHO+/*/+/(1+/(6+/3/ 8/'DPS/RFDWLRQ$SSURYHG8/'DPS/RFDWLRQ$SSURYHG
7KH+DQJLQJ/DPSVFRPHLQWKUHHVL]HVDQGDUHGHVLJQHGWRKDQJXQGHUWKHHDYHVRIDKRXVHIURPDQ7KH+DQJLQJ/DPSVFRPHLQWKUHHVL]HVDQGDUHGHVLJQHGWRKDQJXQGHUWKHHDYHVRIDKRXVHIURPDQ DUERURULQRWKHURYHUKHDGVHWWLQJV
HYHQLQWHULRU
$EURQ]HHVFXWFKHRQSODWHFRYHUVWKHFHLOLQJMXQFWLRQDUERURULQRWKHURYHUKHDGVHWWLQJV HYHQLQWHULRU
$EURQ]HHVFXWFKHRQSODWHFRYHUVWKHFHLOLQJMXQFWLRQ ER[7KH+/(6DQG+/(1KDYHDVWDQGDUGSRUFHODLQVRFNHWZLWKVFUHZEDVHZKLOHWKH+/*/DQG+/ER[7KH+/(6DQG+/(1KDYHDVWDQGDUGSRUFHODLQVRFNHWZLWKVFUHZEDVHZKLOHWKH+/*/DQG+/ 3/KDVDED\RQHWVRFNHW3/KDVDED\RQHWVRFNHW
šŘRIKDQGPDGHFKDLQRILQFKEURQ]HURGSURYLGHG DGGLWLRQDOFKDLQDYDLODEOHšŘRIKDQGPDGHFKDLQRILQFKEURQ]HURGSU RYLGHG DGGLWLRQDOFKDLQDYDLODEOH
š/('EXOEVXSSOLHGš/('EXOEVXSSOLHG
š8/'DPS/RFDWLRQDSSURYHGš8/'DPS/RFDWLRQDSSURYHG
0RGHO+/*/
YROW25YROWFXUUHQW0RGHO+/*/
YROW25YROWFXUUHQW
0RGHO+/(1
YROW25YROWFXUUHQW0RGHO+/(1
YROW25YROWFXUUHQW
0RGHO+/(6
YROW25YROWFXUUHQW0RGHO+/(6
YROW25YROWFXUUHQW
0RGHO+/3/
YROWFXUUHQW0RGHO+/3/
YROWFXUUHQW
-\SS7YVK\J[Z3PZ[
:WLJPÄJH[PVUZ!:VSPK)YVUaL
/HUNPUN3HTW
4VKLS
/3.34VKLS
/3.3
+PTLUZPVUZ!+PTLUZPVUZ!+Ҟ[:Ҟ['Ҟ+Ҟ[:Ҟ['Ҟ >LPNO[!>LPNO[!OEVOEV
4VKLS
/3,54VKLS
/3,5
+PTLUZPVUZ!+PTLUZPVUZ!+Ҟ[:Ҟ['Ҟ+Ҟ[:Ҟ['Ҟ >LPNO[!>LPNO[!OEVOEV
4VKLS
/3,:4VKLS
/3,:
+PTLUZPVUZ!+PTLUZPVUZ!+Ҟ[:Ҟ['Ҟ+Ҟ[:Ҟ['Ҟ >LPNO[!>LPNO[!OEVOEV
4VKLS
/3734VKLS
/373
+PTLUZPVUZ!+PTLUZPVUZ!+Ҟ[:Ҟ['+Ҟ[:Ҟ[' ҞҞ
>LPNO[!>LPNO[!OEVOEV
¬
/LNH6KDUH
/VTL 7YVK\J[Z(IV\[
Exhibit C
30 6HD5DQFK6FRQFH&RH6WXGLRV&RH6WXGLRV
KWWSV
FRHVWXGLRVFRPSURGXFWVVHDUDQFKVFRQFH
6\[KVVYSPNO[PUNMVYNHYKLUZ^HSR^H`ZHUKKYP]L^H`Z
:LH9HUJO:JVUJL
0RGHO65*/DQG0RGHO65(10RGHO65*/DQG0RGHO65(1 7KLVKDQGVRPHZDOOVFRQFHSURYLGHVJRRGGRZQOLJKWDQGVLGHOLJKWIRUHQWU\ZD\V)RUWKH65*/RXU7KLVKDQGVRPHZDOOVFRQFHSURYLGHVJRRGGRZQOLJKWDQGVLGHOLJKWIRUHQWU\ZD\V)RUWKH65*/RXU VXSSOLHG ZY RU YROW /(' EXOEV SURYLGH JRRG OLJKW IRU DQ IRRW UDGLXV )RU WKH 65(1 RXUVXSSOLHG ZY RU YROW /(' EXOEV SURYLGH JRRG OLJKW IRU DQ IRRW UDGLXV )RU WKH 65(1 RXU VXSSOLHGZYRUYROW/('EXOEVSURYLGHVOLJKWIRUDIRRWUDGLXV7KHVHı[WXUHVDOVRDFFHSWVXSSOLHGZYRU YROW/('EXOEVSURYLGHVOLJKWIRUDIRRWUDGLXV7KHVHı[WXUHVDOVRDFFHSW ORZYROWDJHEXOEVIRUORZYROWDJHLQVWDOODWLRQV$OOPRXQWLQJIDVWHQHUVDUHSURYLGHGORZYROWDJHEXOEVIRUORZYROWDJHLQVWDOODWLRQV$OOPRXQWLQJIDVWHQHUVDUHSURYLGHG -\SS7YVK\J[Z3PZ[
:WLJPÄJH[PVUZ!:LH9HUJO
:JVUJL
4VKLS
:9.3!4VKLS
:9.3!
+PTLUZPVUZ!+PTLUZPVUZ!+Ҟ[Ř:Ҟ['Ҟ+Ҟ[Ř:Ҟ['Ҟ >LPNO[!>LPNO[!OEVOEV
4VKLS
:9,5!4VKLS
:9,5!
+PTLUZPVU!+PTLUZPVU!+Ҟ[:Ҟ['Ҟ+Ҟ[:Ҟ['Ҟ >LPNO[!>LPNO[!OEVOEV
*HUVW`^HSSWSH[LKPHTL[LY!*HUVW`^HSSWSH[LKPHTL[LY!+Ҟ[+Ҟ[ 'Ҟ'Ҟ
¬
/LNH6KDUH
/VTL 7YVK\J[Z(IV\[
Exhibit D
2119 Marin Ave
Material Swatches Board
October 5, 2023
Reclaimed corrugated glass awning
GAF Timberline UHDZ composiFon asphalt shingle in Weathered Wood
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager
INFORMATION CALENDAR
January 30, 2024
To: Honorable Mayor and Members of the City Council
From: Dee Williams-Ridley, City Manager
Submitted by: Jordan Klein, Director, Planning and Development Department Subject: LPO NOD: 910 Indian Rock Avenue, #LMIN2023-0002
INTRODUCTION
The attached Notice of Decision (NOD) for the Landmarks Designation is presented to the Mayor and City Council pursuant to Berkeley Municipal Code/Landmarks Preservation Ordinance (BMC/LPO) Section 3.24.160, which requires that “a copy of the Notice of Decision shall be filed with the City Clerk and the City Clerk shall present said copy to the City Council at its next regular meeting.”
CURRENT SITUATION AND ITS EFFECTS
The Landmark Preservation Commission (LPC/Commission) has disapproved the request to designate the subject property as a City Landmark or Structure of Merit. This action is subject to a 15-day appeal period, which began on January 16, 2024.
BACKGROUND
BMC/LPO Section 3.24.190 allows the Council to review any action of the Commission in granting or denying Landmark, Structure of Merit or Historic District status. In order for Council to review the decision on its merits, Council must appeal the NOD. To do so, a Councilmember must move this Information Item to Action and then move to “certify” the decision. Such action must be taken within 15 days from the mailing of the NOD or by January 30, 2024. Such certification to Council shall stay all proceedings in the same manner as the filing of an appeal.
If the Council chooses to appeal the action of the Commission, then a public hearing will be set within 25 days pursuant to BMC/LPO Section 3.24.300. The Council must then rule on the designation within 30 days from the date that the public hearing is opened or the decision of the Commission is automatically deemed affirmed.
Unless the Council wishes to review the determination of the Commission and make its own decision, the attached NOD is deemed received and filed.
LPO NOD: 910 Indian Rock Avenue/#LMIN2023-0002 INFORMATION CALENDAR January 30, 2024
LPC Hearing – Decision to Deny Designation Status
At the October 5, 2023 LPC meeting, the Commission members voted 6-1-0-1 to disapprove the request by petitioners to designate the single-family residence at 910 Indian Rock as a Structure of Merit. [Vote: Yes: Crandall, Enchill, Leuschner, Montgomery; Schwartz, Twu; No: Finacom; Abstain; none; Absent: Linvill (due to recusal)]. Those in favor of the action found that the structure was not worthy of designation status as an individual property or example of the residential work of Berkeley Master architect Walter H. Ratcliff, Jr. This finding was largely based on the lack of exceptional design quality in comparison to other Ratcliff works, and a request from the property owner to deny the petition because they intend to retain and expand the residence rather than demolishing it per a previous plan. Some of the petitioners also spoke during the hearing and encouraged the Commission to deny Landmark status as they no longer considered the property to be in danger of destruction.
ENVIRONMENTAL SUSTAINABILITY & CLIMATE IMPACTS
Landmark designation provides opportunities for the adaptive re-use and rehabilitation of historic resources within the City. The rehabilitation of these resources, rather than their removal, achieves construction and demolition waste diversion, and promotes investment in existing urban centers.
POSSIBLE FUTURE ACTION
The Council may choose to certify or appeal the decision to disapprove designation status, setting the matter for public hearing at a future date.
FISCAL IMPACTS OF POSSIBLE FUTURE ACTION
There are no known fiscal impacts associated with this designation action.
CONTACT PERSON
Fatema Crane, Principal Planner/LPC Secretary, Planning and Development Department; 510-981-7413
Allison Riemer, AICP, Associate Planner, Planning and Development, 510-981-7433 Attachments:
1: Notice of Decision – 910 Indian Rock Avenue, #LMIN2023-0002
Attachment 1, part 1
L A N D M A R K S
P R E S E R V A T I O N
C O M M I S S I O N
N o t i c e o f D e c i s i o n
DATE OF BOARD DECISION: November 2, 2023
DATE NOTICE MAILED: January 15, 2024
APPEAL PERIOD EXPIRATION: January 30, 2024
EFFECTIVE DATE OF PERMIT (Barring Appeal or Certification): January 31, 20241 910 Indian Rock Avenue – Robert H. T. and
Emma Lohse Marrenner House
Landmark application #LMIN2023-0002 for the consideration of City Landmark or Structure of Merit designation status for a residential building constructed in 1916– APN 61-2579-10
The Landmarks Preservation Commission of the City of Berkeley, after conducting a public hearing, DISAPPROVED the Landmark/Structure of Merit designation petition. Initiated by: Verified Application of 83 Berkeley residents Application Authors: John Bernstein and Anthony Bruce, Berkeley Architectural Heritage Association
ZONING DISTRICT: Single Family-Residential (R-1) District, Hillside Overlay (H) ENVIRONMENTAL REVIEW STATUS: Categorically exempt under the California Environmental Quality Act Guidelines, Section 15061(b)(4) for projects that are disapproved. 1 Pursuant to BMC Chapter 3.24, the City Council may “certify” any decision of the LPC for review, which has the same effect as an appeal. In most cases, the Council must certify the LPC decision during the 14-day appeal period. However, pursuant to BMC Section 1.04.070, if any portion of the appeal period falls within a Council recess, the deadline for Council certification is suspended until the first Council meeting after the recess, plus the number of days of the appeal period that occurred during the recess, minus one day. If there is no appeal or certification, the Use Permit becomes effective the day after the certification deadline has passed.
LANDMARKS PRESERVATION COMMISSION
NOTICE OF DECISION
#LMIN2023-0002
910 Indian Rock Avenue
Mailed: January 15, 2024
The application materials for this project is available online at:
https://berkeleyca.gov/construction-development/land-use-development/zoning-projects or https://permits.cityofberkeley.info/CitizenAccess/Default.aspx
FINDINGS FOR DENIAL AND APPLICATION ARE ATTACHED TO THIS NOTICE COMMISSION VOTE: 6-1-0-1 (note: one vacancy)
YES: CRANDALL, ENCHILL, LEUSCHNER, MONTGOMERY, SCHWARTZ, TWU NO: FINACOM
ABSTAIN: NONE
ABSENT: LINVILL (recusal)
TO APPEAL THIS DECISION (see Section 3.24.300 of the Berkeley Municipal Code):
To appeal a decision of the Landmarks Preservation Commission to the City Council you must:
1. Submit a letter clearly and concisely setting forth the grounds for the appeal to the City Clerk, located at 2180 Milvia Street, 1st Floor, Berkeley. The City Clerk’s telephone number is (510) 981-6900.
a. Pursuant to BMC Section 3.24.300.A, an appeal may be taken to the City Council by the application of the owners of the property or their authorized agents, or by the application of at least fifty residents of the City aggrieved or affected by any determination of the commission made under the provisions of Chapter 3.24.
2. Submit the required fee (checks and money orders must be payable to ‘City of Berkeley’):
a. The basic fee for persons other than the applicant is $1,500. This fee may be reduced to $500 if the appeal is signed by persons who lease or own at least 50 percent of the parcels or dwelling units within 300 feet of the project site, or at least 25 such persons (not including dependent children), whichever is less. Signatures collected per the filing requirement in BMC Section 3.24.300.A may be counted towards qualifying for the reduced fee, so long as the signers are qualified. The individual filing the appeal must clearly denote which signatures are to be counted towards qualifying for the reduced fee.
LANDMARKS PRESERVATION COMMISSION
NOTICE OF DECISION
#LMIN2023-0002
910 Indian Rock Avenue
Mailed: January 15, 2024
b. The fee for appeals of affordable housing projects (defined as projects which provide 50 percent or more affordable units for households earning 80% or less of Area Median Income) is $500, which may not be reduced.
c. The fee for all appeals by Applicants is $5,520.
3. The appeal must be received prior to 5:00 p.m. on the "APPEAL PERIOD EXPIRATION" date shown above (if the close of the appeal period falls on a weekend or holiday, then the appeal period expires the following business day).
If no appeal is received, the Structure of Merit designation will be final on the first business day following expiration of the appeal period.
NOTICE CONCERNING YOUR LEGAL RIGHTS:
If you object to this decision, the following requirements and restrictions apply:
1. If you challenge this decision in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence delivered to the Landmarks Preservation Commission at, or prior to, the public hearing.
2. You must appeal to the City Council within fifteen (15) days after the Notice of Decision of the action of the Landmarks Preservation Commission is mailed. It is your obligation to notify the Land Use Planning Division in writing of your desire to receive a Notice of Decision when it is completed.
3. Pursuant to Code of Civil Procedure Section 1094.6(b) and Government Code Section 65009(c)(1), no lawsuit challenging a City Council decision, as defined by Code of Civil Procedure Section 1094.6(e), regarding a use permit, variance or other permit may be filed more than ninety (90) days after the date the decision becomes final, as defined in Code of Civil Procedure Section 1094.6(b). Any lawsuit not filed within that ninety (90) day period will be barred.
4. Pursuant to Government Code Section 66020(d)(1), notice is hereby given to the applicant that the 90-day protest period for any fees, dedications, reservations, or other exactions included in any permit approval begins upon final action by the City, and that any challenge must be filed within this 90-day period.
5. If you believe that this decision or any condition attached to it denies you any reasonable economic use of the subject property, was not sufficiently related to a legitimate public purpose, was not sufficiently proportional to any impact of the project, or for any other reason constitutes a “taking” of property for public use without just compensation under the California or United States Constitutions, your appeal of this decision must include the following information:
A. That this belief is a basis of your appeal.
B. Why you believe that the decision or condition constitutes a "taking" of property as set forth above.
LANDMARKS PRESERVATION COMMISSION
NOTICE OF DECISION
#LMIN2023-0002
910 Indian Rock Avenue
Mailed: January 15, 2024
C. All evidence and argument in support of your belief that the decision or condition constitutes a “taking” as set forth above.
If you do not do so, you will waive any legal right to claim that your property has been taken, both before the City Council and in court.
PUBLIC COMMENT:
Communications to Berkeley boards, commissions or committees are public record and will become part of the City’s electronic records, which are accessible through the City’s website.
Please note: e-mail addresses, names, addresses, and other contact information are not required, but if included in any communication to a City board, commission or committee, will become part of the public record. If you do not want your e-mail address or any other contact information to be made public, you may deliver communications via U.S. Postal Service or in person to the secretary of the relevant board, commission or committee. If you do not want your contact information included in the public record, please do not include that information in your communication. Please contact the secretary to the relevant board, commission or committee for further information.
FURTHER INFORMATION:
Questions about the project should be directed to the project planner, Allison Riemer, at (510) 981-7433 or [email protected]. All project application materials may be viewed at the Permit Service Center (Zoning counter), 1947 Center Street, 3 rd Fl., during regular business hours.
ATTACHMENTS:
1. Findings for Denial
2. Landmark Application
ATTEST:
Fatema Crane, Secretary
Landmarks Preservation Commission
cc: City Clerk
Applicant: Jeffrey Hart, 1811 Yosemite Road, Berkeley, CA 94707 Property Owner: Jacqueline and Gregory Emerson, 910 Indian Rock Avenue, Berkeley, CA 94707
A t t a c h m e n t 1 , p a r t 2
F i n d i n g s f o r D e n i a l
NOVEMBER 2, 2023
910 Indian Rock Avenue – Robert H.T. and Emma
Lohse Marrenner House
Landmark application #LMIN2023-0002 for the consideration of City Landmark or Structure of Merit designation status for a residential building constructed in 1916 – APN 61-2579-10
PROJECT/DESIGNATION DESCRIPTION
City Landmark or Structure of Merit designation of the property at 910 Indian Rock Avenue, Robert H.T. and Emma Lohse Marrenner House.
CEQA FINDINGS
1. The project is found to be exempt from the provisions of the California Environmental Quality Act (CEQA, Public Resources Code §21000, et seq.) pursuant to Section 15061.b.4 of the CEQA Guidelines for projects that have been disapproved.
LANDMARK PRESERVATION ORIDNANCE FINDINGS
2. Pursuant to Berkeley Municipal Code (BMC) Section 3.24.150, the Landmarks Preservation Commission finds that the site is not worthy of designation, and therefore disapproves the request to grant City Landmark or Structure of Merit (SOM) status to the subject property.
Attachment 1, part 3
Communications – January 30, 2024
Council rules limit action on Communications to referral to the City Manager and/or Boards and Commissions for investigation and/or recommendations. All communications submitted to Council are public record.
Supportive Housing
1. David Lerman
Stop Sign Added
2. Theo Posselt
Tibetan Flag Ceremony
3. Tenzin Tsering, on behalf of the Tibetan Association of Northern California (2)
Lack of Berkeley Businesses
4. Marnie Hatch
Berkeley Police Matters
5. Tenzin Jimenez
Residential Parking Permits
6. Ian Goodman
American Democracy
7. Vivian Warkentin
San Francisco Bay Ferry
8. Lauren Gularte, on behalf of Water Transit
Reparations
9. Aden Ishii
Port of Oakland
10. Danny Wan, on behalf of Port of Oakland
Brown Act
11. Jonathan Weissglass
12. Juan Carlo
Chronicle
13. Marc Sapir
Councilmember Robinson
14. Toni Mester
URL’s Only
15. Vivian Warkentin (3)
People’s Park
16. Jack Kurzweil
17. Sylvia
18. Jill Polsby
19. Moni Law (2)
20. Joty Dhaliwal
21. Summer Brenner (2)
22. Max Ventura
23. Arthur Stopes
24. Justin Lee
25. Leslie Firestone
26. Richard Crago
27. Sky Ocean
28. Owen Martin Zuidema
Gaza and Israel
29. Jack Kurzweil (3)
30. Linda and Stanley Wulf
31. Sandy Slauson
32. Karen Davis
33. Jane White
34. Stephanie Thomas
35. Cynthia Moore
36. Michael Weber (2)
37. Sally Nelson
38. Gael Alcock
39. Summer Brenner (2)
40. Mary Ann Gallagher
41. Jocelyn Goldsmith
42. Stephanie Allan
43. Barbara Erickson (2)
44. Jamie Cooney
45. Esha Potharaju
46. Summer Brenner
47. Diana Bohn
48. Dahlia Frydman
49. Elinor Tamari
50. Michael Kaye
51. Mincers.shroud.0k@
52. Noga Alon
53. Deborah Green
54. June Safran
55. Barbara Schick
56. Elana Auerbach
57. Esther Brass-Chorin
58. Allen Mayer
59. Dorit Dorenz
60. Doreet Stein
61. Robert Bonem
62. Peggy Scott
63. 5 similarly-worded form letters
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63