Cities Index.
Agenda packet

Berkeley City Council
April 22, 2025

Document
Agenda packet
Meeting
April 22, 2025
Body
Berkeley City Council
Pages
136
Original file
43.9 MB
Text extracted from the city's file for reading and search. The city's original file is the official record.

Tuesday, April 22, 2025 REVISED AGENDA Page 1

R E V I S E D P R O C L AM AT I O N

C AL L I N G A S P E C I AL M E E T I N G O F T H E

B E R K E L E Y C I T Y C O U N C I L
( R E V I S E D T O A D D T E L E C O N F E R E N C E L O C A T I O N ) In accordance with the authority in me vested, I do hereby call the Berkeley City Council in special session as follows:

Tuesday, April 22, 2025
6:00 PM
SCHOOL DISTRICT BOARD ROOM - 1231 ADDISON STREET, BERKELEY, CA 94702 TELECONFERENCE LOCATION - 9175 LARK STREET, ELK GROVE, CA 95624

ADENA ISHII, MAYOR
Councilmembers:

DISTRICT 1 – RASHI KESARWANI DISTRICT 5 – SHOSHANA O’KEEFE DISTRICT 2 – TERRY TAPLIN DISTRICT 6 – BRENT BLACKABY
DISTRICT 3 – BEN BARTLETT DISTRICT 7 – CECILIA LUNAPARRA DISTRICT 4 – IGOR TREGUB DISTRICT 8 – MARK HUMBERT
This meeting will be conducted in a hybrid model with both in -person attendance and virtual participation. Live captioned broadcasts of Council meetings are available on B -TV (Channel 33) and via internet video stream at http://berkeley.granicus.com/MediaPlayer.php?publish_id=1244. All Council meetings are recorded.

To access the meeting remotely use this URL : https://cityofberkeley-info.zoomgov.com/j/1604791189. To request to speak, use the “raise hand” function in Zoom. To join by phone: Dial 1-669-254-5252 or 1-833-568-8864 (Toll Free) and enter Meeting ID: 160 479 1189 . To provide public comment, Press *9 and wait to be recognized by the Chair. To submit a written communication for the public record, email [email protected].

This meeting will be conducted in accordance with the Brown Act, Government Code Section 54953. Any member of the public may attend this meeting, however, if you are feeling sick, please do not attend the meeting in person.

The City Council may take action related to any subject listed on the Agenda.

Pursuant to the City Council Rules of Procedure and State Law, the presiding officer may remove, or cause the removal of, an individual for disrupting the meeting. Prior to removing an individual, the presiding officer shall warn the individual that their behavior is disrupting the meeting and that their failure to cease their behavior may result in their removal. The presiding officer may then remove the individual if they do not promptly cease their disruptive behavior. “Disrupting” means engaging in behavior during a meeting of a legislative body that actually disrupts, disturbs, impedes, or renders infeasible the orderly conduct of the meeting and includes, but is not limited to, a failure to comply with reasonable and lawful regulations adopted by a legislative body, or engaging in behavior that constitutes use of force or a true threat of force.

Government Code Section 84308 (Levine Act) - Parties to a proceeding involving a license, permit, or other entitlement for use are required to disclose if they made contributions over $5 00 within the prior 12 months to any City employee or officer. Parties and participants with a financial interest are prohibited from making more than $500 in contributions to a decisionmaker for the 12 months after the final decision is rendered on the proceeding.

The above contribution disclosures and restrictions do not apply when the proceeding is competitively bid, or involves a personnel or labor contract. For more information, see Government Code Section 84308.

Rev - 1

Tuesday, April 22, 2025 REVISED AGENDA Page 2

Preliminary Matters
Roll Call:

Action Calendar – Public Hearings

Staff shall introduce the public hearing item and present their comments. For certain hearings, this is followed by five-minute presentations each by first the appellant and then the applicant. The Presiding Officer will request that persons wishing to speak line up at the podium, or use the "raise hand" function in Zoom, to be recognized and to determine the number of persons interested in speaking at that time.

If ten or fewer persons are interested in speaking during a public hearing, each speaker may speak for two minutes. If there are more than ten persons interested in speaking, the Presiding Officer may limit the public comment for all speakers to one minute per speaker. Speakers are permitted to yield their time to one other speaker, however no one speaker shall have more than four minutes. The Presiding Officer may with the consent of persons representing both sides of an issue allocate a block of time to each side to present their issue.

When applicable, each member of the City Council shall verbally disclose all ex parte contacts concerning the subject of the hearing. Councilmembers shall also submit a report of such contacts in writing prior to the commencement of the hearing. Written reports shall be available for public review in the office of the City Clerk.

1. ZAB Appeal: 2274 Shattuck Avenue, Use Permit #ZP2023-0079 From: City Manager
Recommendation: Conduct a public hearing and, upon conclusion, adopt a Resolution affirming the Zoning Adjustments Board decision to approve Use Permit #ZP2023-0079 to demolish the commercial building (preserving and renovating the front façade and lobby), and construct a 17-story (183 feet, plus 5-foot parapet), 214,032-square-foot, mixed-use residential building with 227 dwelling units (including 23 Very Low-Income Density Bonus qualifying units), and one ADA parking space, and dismiss the appeal.

Financial Implications: None
Contact: Jordan Klein, Planning and Development, (510) 981-7400

Adjournment
I hereby request that the City Clerk of the City of Berkeley cause personal notice to be given to each member of the Berkeley City Council on the time and place of said meeting, forthwith.

IN WITNESS WHEREOF, I have hereunto set my hand and caused the official seal of the City of Berkeley to be affixed on this 17th day of April, 2025.

/s/ Adena Ishii, Mayor
Public Notice – this Proclamation serves as the official agenda for this meeting.

Rev - 2

Tuesday, April 22, 2025 REVISED AGENDA Page 3

ATTEST:

Date: April 17, 2025
Mark Numainville, City Clerk

NOTICE CONCERNING YOUR LEGAL RIGHTS : If you object to a decision by the City Council to approve or deny a use permit or variance for a project the following requirements and restrictions apply:
1) No lawsuit challenging a City decision to deny (Code Civ. Proc. §1094.6(b)) or approve (Gov. Code 65009(c)(5)) a use permit or variance may be filed more than 90 days after the date the Notice of Decision of the action of the City Council is mailed. Any lawsuit not filed within that 90 -day period will be barred. 2) In any lawsuit that may be filed against a City Council decision to approve or deny a use permit or variance, the issues and evidence will be limited to those raised by you or someone else, orally or in writing, at a public hearing or prior to the close of the last public hearing on the project.

Archived indexed video streams are available at:
https://berkeleyca.gov/your-government/city-council/city-council-agendas.

Channel 33 rebroadcasts the following Wednesday at 9:00 a.m. and Sunday at 9:00 a.m.

Communications to the City Council are public record and will become part of the City’s electronic records, which are accessible through the City’s website. Please note: e-mail addresses, names, addresses, and other contact information are not required, but if included in any communication to the City Council, will become part of the public record. If you do not want your e-mail address or any other contact information to be made public, you may deliver communications via U.S. Postal Service to the City Clerk Department at 2180 Milvia Street. If you do not want your contact information included in the public record, please do not include that information in your communication. Please contact the City Clerk Department for further information.

Any writings or documents provided to a majority of the City Council regarding any item on this agenda will be made available for public inspection at the public counter at the City Clerk Department located on the first floor of City Hall located at 2180 Milvia Street, and through the City's online records portal:
https://records.cityofberkeley.info/.

Agendas, agenda reports, and revised/supplemental material may be accessed via the online agenda for this meeting at:
https://berkeleyca.gov/your-government/city-council/city-council-agendas and may be accessed at reference desks at the following locations:

City Clerk Department - 2180 Milvia Street, First Floor Tel: 510-981-6900, TDD: 510-981-6903, Fax: 510-981-6901 Email: [email protected]

Libraries: Main – 2090 Kittredge Street,
Claremont Branch – 2940 Benvenue, West Branch – 1125 University, North Branch – 1170 The Alameda, Tarea Hall Pittman South Branch – 1901 Russell

COMMUNICATION ACCESS INFORMATION:

This meeting is being held in a wheelchair accessible location.

To request a disability-related accommodation(s) to participate in the meeting, including auxiliary aids or services, please contact the Disability Services specialist at [email protected], (510) 981-6418 (V), or (510) 981-6347 (TDD) at least three business days before the meeting date.

Please refrain from wearing scented products to this meeting.

Rev - 3

Tuesday, April 22, 2025 REVISED AGENDA Page 4
Captioning services are provided at the meeting, on B -TV, and on the Internet. In addition, assisted listening devices for the hearing impaired are available from the City Clerk prior to the meeting, and are to be returned before the end of the meeting.

Communications
Council rules limit action on Communications to referral to the City Manager and/or Boards and Commissions for investigation and/or recommendations. All communications submitted to Council are public record. Copies of individual communications are available for viewing at the City Clerk Department and through Records Online.

Item #1: ZAB Appeal: 2274 Shattuck Avenue, Use Permit #ZP2023-0079

1. Laura Fujii

2. Frances Wilson

3. Constance Rivemale

4. Summer Brenner (2)

5. Sharon Gong

6. Neil Goldstein

7. Laura and Rose

8. Laura Linden (6)

9. R. Kowalski

10. Lisa Lewis

11. East Bay for Everyone

12. Greg King and Gary Parks

13. Anjali Devi

14. Allen Michaan

15. Barbara Hadenfeldt

16. Jane White

17. Gretta Goldenman

18. Gale Garcia

19. Todd Jersey

20. Mary Ann Gallagher

21. Sara Sunstein

22. James Angus, Liz Linden, Eve Angus, and Lucy Angus

23. Jjbrogan

24. Mollie Starr

25. Kathi Pugh and Josh Maddox

26. Lisa Titus

27. Barbara Kloehn

28. Rose Ellis

29. Dan Ondrasek

30. Kyle Miller

31. Harvey Smith

32. Madeleine Roberts (3)

33. Tom Lippe on behalf of Save the UA Berkeley

34. Scott Selmanoff

35. 283 Similarly worded form letters

Rev - 4
Tuesday, April 22, 2025 AGENDA Page 1

P R O C L AM AT I O N

C AL L I N G A S P E C I AL M E E T I N G O F T H E

B E R K E L E Y C I T Y C O U N C I L
In accordance with the authority in me vested, I do hereby call the Berkeley City Council in special session as follows:

Tuesday, April 22, 2025
6:00 PM
SCHOOL DISTRICT BOARD ROOM - 1231 ADDISON STREET, BERKELEY, CA 94702

ADENA ISHII, MAYOR
Councilmembers:

DISTRICT 1 – RASHI KESARWANI DISTRICT 5 – SHOSHANA O’KEEFE DISTRICT 2 – TERRY TAPLIN DISTRICT 6 – BRENT BLACKABY
DISTRICT 3 – BEN BARTLETT DISTRICT 7 – CECILIA LUNAPARRA DISTRICT 4 – IGOR TREGUB DISTRICT 8 – MARK HUMBERT
This meeting will be conducted in a hybrid model with both in -person attendance and virtual participation. Live captioned broadcasts of Council meetings are available on B -TV (Channel 33) and via internet video stream at http://berkeley.granicus.com/MediaPlayer.php?publish_id=1244. All Council meetings are recorded.

To access the meeting remotely use this URL : https://cityofberkeley-info.zoomgov.com/j/1604791189. To request to speak, use the “raise hand” function in Zoom. To join by phone: Dial 1-669-254-5252 or 1-833-568-8864 (Toll Free) and enter Meeting ID: 160 479 1189 . To provide public comment, Press *9 and wait to be recognized by the Chair. To submit a written communication for the public record, email [email protected].

This meeting will be conducted in accordance with the Brown Act, Government Code Section 54953. Any member of the public may attend this meeting, however, if you are feeling sick, please do not attend the meeting in person.

The City Council may take action related to any subject listed on the Agenda.

Pursuant to the City Council Rules of Procedure and State Law, the presiding officer may remove, or cause the removal of, an individual for disrupting the meeting. Prior to removing an individual, the presiding officer shall warn the individual that their behavior is disrupting the meeting and that their failure to cease their behavior may result in their removal. The presiding officer may then remove the individual if they do not promptly cease their disruptive behavior. “Disrupting” means engaging in behavior during a meeting of a legislative body that actually disrupts, disturbs, impedes, or renders infeasible the orderly conduct of the meeting and includes, but is not limited to, a failure to comply with reasonable and lawful regulations adopted by a legislative body, or engaging in behavior that constitutes use of force or a true threat of force.

Government Code Section 84308 (Levine Act) - Parties to a proceeding involving a license, permit, or other entitlement for use are required to disclose if they made contributions over $5 00 within the prior 12 months to any City employee or officer. Parties and participants with a financial interest are prohibited from making more than $500 in contributions to a decisionmaker for the 12 months after the final decision is rendered on the proceeding.

The above contribution disclosures and restrictions do not apply when the proceeding is competitively bid, or involves a personnel or labor contract. For more information, see Government Code Section 84308.

Page 1 ends

Tuesday, April 22, 2025 AGENDA Page 2

Preliminary Matters
Roll Call:

Action Calendar – Public Hearings

Staff shall introduce the public hearing item and present their comments. For certain hearings, this is followed by five-minute presentations each by first the appellant and then the applicant. The Presiding Officer will request that persons wishing to speak line up at the podium, or use the "raise hand" function in Zoom, to be recognized and to determine the number of persons interested in speaking at that time.

If ten or fewer persons are interested in speaking during a public hearing, each speaker may speak for two minutes. If there are more than ten persons interested in speaking, the Presiding Officer may limit the public comment for all speakers to one minute per speaker. Speakers are permitted to yield their time to one other speaker, however no one speaker shall have more than four minutes. The Presiding Officer may with the consent of persons representing both sides of an issue allocate a block of time to e ach side to present their issue.

When applicable, each member of the City Council shall verbally disclose all ex parte contacts concerning the subject of the hearing. Councilmembers shall also submit a report of such contacts in writing prior to the commencement of the hearing. Written reports shall be available for public review in the office of the City Clerk.

1. ZAB Appeal: 2274 Shattuck Avenue, Use Permit #ZP2023-0079 From: City Manager
Recommendation: Conduct a public hearing and, upon conclusion, adopt a Resolution affirming the Zoning Adjustments Board decision to approve Use Permit #ZP2023-0079 to demolish the commercial building (preserving and renovating the front façade and lobby), and construct a 17-story (183 feet, plus 5-foot parapet), 214,032-square-foot, mixed-use residential building with 227 dwelling units (including 23 Very Low-Income Density Bonus qualifying units), and one ADA parking space, and dismiss the appeal.

Financial Implications: None
Contact: Jordan Klein, Planning and Development, (510) 981-7400

Adjournment
I hereby request that the City Clerk of the City of Berkeley cause personal notice to be given to each member of the Berkeley City Council on the time and place of said meeting, forthwith.

IN WITNESS WHEREOF, I have hereunto set my hand and caused the official seal of the City of Berkeley to be affixed on this 14th day of April, 2025.

/s/ Adena Ishii, Mayor
Public Notice – this Proclamation serves as the official agenda for this meeting.

Page 2 ends

Tuesday, April 22, 2025 AGENDA Page 3

ATTEST:

Date: April 14, 2025
Mark Numainville, City Clerk

NOTICE CONCERNING YOUR LEGAL RIGHTS : If you object to a decision by the City Council to approve or deny a use permit or variance for a project the following requirements and restrictions apply:
1) No lawsuit challenging a City decision to deny (Code Civ. Proc. §1094.6(b)) or approve (Gov. Code 65009(c)(5)) a use permit or variance may be filed more than 90 days after the date the Notice of Decision of the action of the City Council is mailed. Any lawsuit not filed within that 90 -day period will be barred. 2) In any lawsuit that may be filed against a City Council decision to approve or deny a use permit or variance, the issues and evidence will be limited to those raised by you or someone else, orally or in writing, at a public hearing or prior to the close of the last public hearing on the project.

Archived indexed video streams are available at:
https://berkeleyca.gov/your-government/city-council/city-council-agendas.

Channel 33 rebroadcasts the following Wednesday at 9:00 a.m. and Sunday at 9:00 a.m.

Communications to the City Council are public record and will become part of the City’s electronic records, which are accessible through the City’s website. Please note: e-mail addresses, names, addresses, and other contact information are not required, but if included in any communication to the City Council, will become part of the public record. If you do not want your e-mail address or any other contact information to be made public, you may deliver communications via U.S. Postal Service to the City Clerk Department at 2180 Milvia Street. If you do not want your contact information included in the public record, please do not include that information in your communication. Please contact the City Clerk Department for further information.

Any writings or documents provided to a majority of the City Council regarding any item on this agenda will be made available for public inspection at the public counter at the City Clerk Department located on the first floor of City Hall located at 2180 Milvia Street, and through the City's online records portal:
https://records.cityofberkeley.info/.

Agendas, agenda reports, and revised/supplemental material may be accessed via the online agenda for this meeting at:
https://berkeleyca.gov/your-government/city-council/city-council-agendas and may be accessed at reference desks at the following locations:

City Clerk Department - 2180 Milvia Street, First Floor Tel: 510-981-6900, TDD: 510-981-6903, Fax: 510-981-6901 Email: [email protected]

Libraries: Main – 2090 Kittredge Street,
Claremont Branch – 2940 Benvenue, West Branch – 1125 University, North Branch – 1170 The Alameda, Tarea Hall Pittman South Branch – 1901 Russell

COMMUNICATION ACCESS INFORMATION:

This meeting is being held in a wheelchair accessible location.

To request a disability-related accommodation(s) to participate in the meeting, including auxiliary aids or services, please contact the Disability Services specialist at [email protected], (510) 981-6418 (V), or (510) 981-6347 (TDD) at least three business days before the meeting date.

Please refrain from wearing scented products to this meeting.

Page 3 ends

Tuesday, April 22, 2025 AGENDA Page 4
Captioning services are provided at the meeting, on B -TV, and on the Internet. In addition, assisted listening devices for the hearing impaired are available from the City Clerk prior to the meeting, and are to be returned before the end of the meeting.

Communications
Council rules limit action on Communications to referral to the City Manager and/or Boards and Commissions for investigation and/or recommendations. All communications submitted to Council are public record. Copies of individual communications are available for viewing at the City Clerk Department and through Records Online.

Item #1: ZAB Appeal: 2274 Shattuck Avenue, Use Permit #ZP2023-0079

1. Laura Fujii

2. Frances Wilson

3. Constance Rivemale

4. Summer Brenner (2)

5. Sharon Gong

6. Neil Goldstein

7. Laura and Rose

8. Laura Linden (6)

9. R. Kowalski

10. Lisa Lewis

11. East Bay for Everyone

12. Greg King and Gary Parks

13. Anjali Devi

14. Allen Michaan

15. Barbara Hadenfeldt

16. Jane White

17. Gretta Goldenman

18. Gale Garcia

19. Todd Jersey

20. Mary Ann Gallagher

21. Sara Sunstein

22. James Angus, Liz Linden, Eve Angus, and Lucy Angus

23. Jjbrogan

24. Mollie Starr

25. Kathi Pugh and Josh Maddox

26. Lisa Titus

27. Barbara Kloehn

28. Rose Ellis

29. Dan Ondrasek

30. Kyle Miller

31. Harvey Smith

32. Madeleine Roberts (3)

33. Tom Lippe on behalf of Save the UA Berkeley

34. Scott Selmanoff

35. 283 Similarly worded form letters

Page 4 ends

Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager

PUBLIC HEARING
April 22, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Jordan Klein, Director, Planning & Development Department Subject: ZAB Appeal: 2274 Shattuck Avenue, Use Permit #ZP2023-0079

RECOMMENDATION
Conduct a public hearing and, upon conclusion, adopt a Resolution affirming the Zoning Adjustments Board decision to approve Use Permit #ZP2023-0079 to demolish the commercial building (preserving and renovating the front façade and lobby), and construct a 17-story (183 feet, plus 5-foot parapet), 214,032-square-foot, mixed-use residential building with 227 dwelling units (including 23 Very Low-Income Density Bonus qualifying units), and one ADA parking space, and dismiss the appeal.

FISCAL IMPACTS OF RECOMMENDATION
None.

CURRENT SITUATION AND ITS EFFECTS
On November 29, 2022, Isaiah Stackhouse, Trachtenberg Architects, submitted a Preliminary Application to vest rights pursuant to Senate Bill (SB) 330, the Housing Crisis Act of 20191, for a housing development project.

On June 2, 2023, staff received from Isaiah Stackhouse of Trachtenberg Architects, Use Permit application #ZP2023-0079 to demolish the commercial building on a landmarked site (preserving and renovating the front façade and lobby), and construct a 17-story, mixed-use building with 227 dwelling units (“Project”).

On December 5, 2023, staff received Landmark Initiation application #LMIN2023-0003, submitted by members of Save the UA Theater organization. On January 4, 2024, the use permit application #ZP2023-0079 was deemed complete.

On February 1, 2024, the Landmarks Preservation Commission (LPC) reviewed the demolition referral and Landmark Initiation application #LMIN2023-0003, and 1 Government Code, §§ 65941.1 and 66300-66301.

Page 1 of 132 ends
Page 5 ends

ZAB Appeal: 2274 Shattuck Avenue PUBLIC HEARING
Use Permit #ZP2023-0079 April 22, 2025

Page 2 ends

designated the United Artists (UA) Theater building a City Landmark, with the following distinguishing features to be preserved and restored: the upper portion of the Shattuck Avenue building façade in relation to the overall height and massing of the façade, and the architectural and decorative features of the upper portion of the Shattuck Avenue building façade. The Notice of Decision (NOD) was issued thereafter, and became effective on March 20, 2024.

On November 21, 2024, the Project was reviewed by the Design Review Committee (DRC) for Preliminary Design Review (under application #DRCP2023-0008). The DRC provided a favorable recommendation to the ZAB with conditions and recommendations for Final Design Review.

On March 4, 2024, the Applicant’s attorney, Hanson Bridgett, LLP, submitted an Assembly Bill (AB) 1633 Notice with attached technical reports to support a California Environmental Quality Act (CEQA) Categorical Exemption for Infill projects.

On October 4, 2024, upon review of all evidence on the record, staff determined the project to be exempt from CEQA under the Class 32 Categorical Exemption for “In-Fill Development Projects”.

On December 12, 2024, the Zoning Adjustments Board (ZAB) conducted a public hearing for the use permit application. After hearing public comments and holding discussion, the ZAB approved the use permit by a vote of 8-0-0-1 (Yes: Duffy, Plese, Capitelli, Jersey, Sanderson, Thompson, Gaffney, Allen; No: None; Abstain: None;

Absent: Kashani).

On December 30, 2024, staff issued a Notice of Decision for the ZAB approval.

On January 13, 2025, the City Clerk received an appeal filing from Brandt-Hawley Law Group on behalf of Save the UA Berkeley.

On or before March 8, 2025, staff posted the public hearing notice at the site and three nearby locations and mailed notices to property owners and occupants within 300 feet of the project site, and to all registered neighborhood groups that cover this area. The Council must conduct a public hearing to resolve the appeal.

BACKGROUND
The following background is a summary of salient information on the Project for the Council’s consideration of this appeal. For details and additional project background, see Attachment 4, the December 12, 2024 ZAB staff report for the Project.

Project Setting and Description
The Project site is located on an L-shaped lot, on the west side of Shattuck Avenue and the north side of Bancroft Way, within the Downtown Mixed-Use District (C-DMU), Corridor Sub-Area, as identified in the City’s Downtown Area Plan (DAP). The Project

Page 2 of 132 ends
Page 6 ends

ZAB Appeal: 2274 Shattuck Avenue PUBLIC HEARING
Use Permit #ZP2023-0079 April 22, 2025

Page 3 ends

site is surrounded by commercial, residential, institutional and mixed-use commercial/residential buildings ranging in height from one to five stories.

The site is occupied by a 23,289 square foot movie theater that was originally constructed in 1932 as the United Artists Theater (UA Theater), that operated until its closure in February 2023. The UA Theater is listed on the California Register of Historical Resources (CRHR), and the façade on Shattuck Avenue was designated a City Landmark in March 2024.

The Project proposes to demolish the former theater building on the landmarked site (while preserving the front façade and lobby), and construct a 17-story (183 feet, plus 5- foot parapet), 214,032-square-foot, mixed-use residential building with 227 dwelling units, utilizing the State Density Bonus. The Project is eligible for a density bonus2 by including 23 Very Low-income units (15 percent of the 151-unit base project), and qualifies for a 50 percent density bonus, or 76 bonus units, resulting in a 227-unit density bonus project. The Project requests no concessions, but requests waivers for height, front and side setbacks, diagonal width, private (usable) open space, and long- term bicycle parking to accommodate the density bonus project on the site.

Design Review Committee and Landmarks Preservation Commission The Project was referred to the DRC for Preliminary Design Review (#DRCP2023-0008) on November 21, 2024. The DRC provided a favorable recommendation to the ZAB with conditions and recommendations for Final Design Review.

Since the Project involves demolition of a commercial building over 40 years in age, the proposed demolition was referred to the LPC for review under the use permit application. In addition, a Landmark Initiation Application (#LMIN2023-0003) was submitted on December 6, 2023 by Save the UA Theater organization. The LPC reviewed the demolition referral and the landmark initiation concurrently at a meeting on February 1, 2024, and designated the façade a City Landmark, with the following distinguishing features to be preserved and restored: the upper portion of the Shattuck Avenue building façade in relation to the overall height and massing of the façade, and the architectural and decorative features of the upper portion of the Shattuck Avenue building façade. The Notice of Decision was issued, and became effective on March 20, 2024.

The Project’s SB 330 Preliminary Application vested the site’s historical resource status on November 29, 2022, at which time it had not yet been designated as a local historic resource (City Landmark). Therefore, the LPC and the City are prohibited by state law from denying the project or imposing conditions related to cultural or historic resources protections on the project after this date. Although the site is currently a designated City Landmark, the requirements that typically apply to Landmarks do not apply to the 2 Government Code Section 65915

Page 3 of 132 ends
Page 7 ends

ZAB Appeal: 2274 Shattuck Avenue PUBLIC HEARING
Use Permit #ZP2023-0079 April 22, 2025

Page 4 ends

project. However, the project’s impact on cultural resources under CEQA is not affected by the LPC determination.

CEQA Categorical Exemption
On October 4, 2024, staff determined that the Project is categorically exempt from the provisions of CEQA under Section 15332 (“Infill Development Projects”) of the CEQA Guidelines, pursuant to AB 1633 (See Exhibit 1 to Exhibit A of Attachment 1, the proposed Resolution). AB 1633, which became effective on January 1, 2024, revised a provision in the Housing Accountability Act3 (HAA) that allows project sponsors to file a petition to enforce the HAA’s protections where a local agency fails to make a determination that the project is exempt from CEQA when it is eligible for the exemption.

The Project applicant filed an AB 1633 Notice with the City on March 4, 2024, and attached technical reports that supported the Project’s eligibility for a Class 32 Categorical Exemption from CEQA and the inapplicability of any Exceptions to the exemption4 (see Attachment 2). Submitted technical reports included: Traffic Impact Analysis, Historic Resources Evaluation, Project Impacts Analysis, Air Quality Impacts Analysis, Noise Impact Analysis, and Water Quality Impact Analysis. All technical reports were peer reviewed by the City’s CEQA consultant (“Consultant”) and were revised or supplemented for adequacy.

Upon review of all evidence on the record, it was determined that the Project met all of the requirements of the Class 32 Infill Exemption.5 Further, it was determined that the Project would not result in a substantial adverse change to the historical resource (the UA Theater) because it would preserve and rehabilitate the main character-defining feature of the historical resource (namely, the Art Deco upper façade on Shattuck Avenue). Thus, staff determined that the Project would not meet the criteria for the historical resource exception to the use of a categorical exemption.6 Staff also determined that none of the other exceptions in the CEQA Guidelines apply to the 3 Government Code, § 65589.5.
4 CEQA Guidelines, § 15300.2.
5 CEQA Guidelines, § 15332 describes a categorical exemption for infill development projects meeting the following conditions:
(a) The Project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. (b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses.
(c) The project site has no value, as habitat for endangered, rare or threatened species. (d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality.
(e) The site can be adequately served by all required utilities and public services. 6 CEQA Guidelines, § 15300.2(f). “Historical Resources. A categorical exemption shall not be used for a project which may cause a substantial adverse change in the significance of a historical resource.”

Page 4 of 132 ends
Page 8 ends

ZAB Appeal: 2274 Shattuck Avenue PUBLIC HEARING
Use Permit #ZP2023-0079 April 22, 2025

Page 5 ends

Project [(a) Location, (b) Cumulative Impact, (c) Significant Effect, and (d) Scenic Highways, and (e) Hazardous Waste Sites].

Staff issued an AB 1633 Determination Letter on October 4, 2024, with the determination that the Project is exempt under the Class 32 Infill Exemption. The ZAB found the Project compliant with all vested and applicable, objective General Plan and zoning standards, without specific adverse impact on public health or safety, and approved the Project at the decision hearing on December 12, 2024 without reductions to Project’s density, pursuant to the HAA.7

RATIONALE FOR RECOMMENDATION
The issues raised in the Appellant’s letter and staff’s responses follow. For the sake of brevity, the appeal issues are not re-stated in their entirety. Please refer to the appeal letter (Attachment 3) for the full text.

Issue 1:

The appellant asserts that the UA Theater qualifies as a "mandatory" historic resource vis-a-vis its listing in the California Register of Historical Resources (Public Resources Code, Section 21084.1). The State of California recognizes that the historic status encompasses more than the facade. The substantial demolition of the theater would cause a substantial adverse change in its historic significance, and therefore, the historic resource exemption exception applies.

Response:

The City recognizes that the UA Theater building is an historic resource as defined in CEQA Guidelines, Section 21084.18, as the appellant asserts. The building as a whole was designated in the CRHR on March 15, 2006 by the State, after an evaluation of the building as a part of the Alameda-Contra Costa County Transit East Bay Rapid Transit Project, in which the site’s condition was documented. The applicant submitted a Historic Resource Evaluation (HRE, dated December 7, 2023) and a Project Impact Analysis (PIA, dated March 1, 2024) prepared by a qualified consultant, which extensively evaluated the history of alterations to the building, the building’s current condition, and the Project’s consistency with applicable Secretary of Interior standards.

The HRE found substantial evidence documenting that the UA Theater historic resource has been significantly altered over time, such that its extant character-defining features 7 The Housing Accountability Act (HAA), Government Code, § 65589.5(j), requires that when a proposed housing development complies with the applicable, objective general plan and zoning standards, but a local agency proposes to deny the project or approve it only if the density is reduced, the agency must base its decision on written findings supported by substantial evidence that the development would have a specific adverse impact on public health or safety unless disapproved, or approved at a lower density; and there is no feasible method to satisfactorily mitigate or avoid the specific adverse impact, other than the disapproval, or approval at a lower density.
8 Public Resources Code § 21000, et seq., is also known as the CEQA Guidelines.

Page 5 of 132 ends
Page 9 ends

ZAB Appeal: 2274 Shattuck Avenue PUBLIC HEARING
Use Permit #ZP2023-0079 April 22, 2025

Page 6 ends

no longer convey the site’s significance. The PIA concluded that the Project would not cause “substantial adverse change” to the remaining character-defining features of the theater building that still convey significance (the upper front façade), and that the Project is consistent with the Secretary of Interior standards for rehabilitation. The City’s LPC conducted a review and public hearing to consider the designation of the theater as a City Landmark on February 1, 2024, and after considering the request in the initiation application to designate the entire theater building (including interior elements) as a City Landmark, the LPC chose to designate only the building façade and its decorative detail as the distinguishing features to be preserved.9 Staff retained a Consultant to peer review all of the applicant-submitted technical reports. The City’s Consultant prepared a revised PIA that identified other character- defining features in addition to the theater façade, and recommended that despite the Project’s proposal to retain aspects of the theater’s Art Deco design, the proposed demolition of the theater would result in a substantial adverse change to the resource.

Prior to making the CEQA determination for the Project, staff reviewed all of the evidence in the record, including: 1) the project application materials, plans and technical reports10; 2) City Consultant peer reviews of submitted technical reports, including the historic resource reports; 3) the revised PIA prepared by the City’s Consultant; 4) the LPC’s Notice of Determination; 5) City Attorney guidance; and 6) City Council’s deliberations at the closed session meeting held on September 24, 2024.

Based on the consideration of all evidence on the record for the Project, staff ultimately determined that there is substantial evidence in the record that the Project meets all of the requirements for a Class 32, Infill Exemption from CEQA review.11 Further, staff determined that the Project would not result in a substantial adverse change to the UA Theater historical resource, because it proposes to retain the architectural design and details of the character-defining feature that embodies its historical significance, and that the historical resource exception to the use of a categorical exemption would not 9 The LPC’s Notice of Determination (NOD) states that the designation shall apply to specific distinguishing features of the main building as the features that shall be preserved and restored to the extent possible: 1) the upper portion of the Shattuck Avenue building façade in relation to the overall height and massing of the façade; and 2) the architectural and decorative features of the upper portion of the Shattuck Avenue building façade.

Note that while the LPC designated the site a City Landmark, the project’s SB 330 Preliminary Application vested the site’s historical resource status on November 29, 2022 as not a local historic resource (City Landmark). This status remains valid during the pendency of the housing development project for which the application was made.
10 Technical reports submitted by the applicant included a Traffic Impact Analysis, an Historic Resource Evaluation, a Project Impacts Analysis, and Air Quality, Noise, and Water Quality reports. 11 Pursuant to Government Code, § 65589.5, the Housing Accountability Act (under AB 1633)

Page 6 of 132 ends
Page 10 ends

ZAB Appeal: 2274 Shattuck Avenue PUBLIC HEARING
Use Permit #ZP2023-0079 April 22, 2025

Page 7 ends

apply. Staff issued an AB 1633 determination letter to convey the exempt determination on October 4, 2024.12
Issue 2:

The categorical exemption is not consistent with the Downtown Plan, including policies for the protection and expansion of historic theaters that specifically reference UA Berkeley (Theater).

Response:

The City’s Downtown Area Plan (DAP) is comprised of broad policies and goals that guide development in the downtown district. It includes policies and goals that encourage the retention and expansion of cinema, along with live theater and music venues, with the goal to strengthen the downtown as a prime regional destination for these types of art. Specifically, Policy ED-1.7: Entertainment & Culture in the DAP, speaks to the goal of preserving cinema in the downtown:

Policy ED-1.7: Entertainment & Culture. Strengthen Downtown as a prime regional destination for alternative and mainstream cinema, and live theater and music. Evaluate and enhance the theater- and cinema-going experience in subareas where they are concentrated.
a) Work to retain and expand cinemas, live theaters, and music venues. b) Work with cinema, theater, and music venues to upgrade to state-of-the-art facilities.
c) Evaluate the experience of going to Downtown theaters, cinemas and music venues, and make enhancements to public safety and aesthetics. Adopt SOSIP recommendations such as pedestrian-scaled lighting for enhancing Downtown as a destination as part of the SOSIP (see policies under Goal OS-1). Give special attention to improving the theater-going experience near Shattuck and Kittredge Street and near Shattuck and Addison, as well as connections to nearby parking facilities.
d) Promote the arts and cultural events, programs and activities.13 Economic Development Policy ED-1.7 identifies the UA Theater in a photograph in Figure ED-1 Historic Cinemas14 as a building that helps to “contribute to the special sense of place that distinguishes Downtown from other destinations”, along with the California Theater, and music clubs and live theater venues in the area. Though the UA Theater is referenced, this policy is not an objective development standard that can be 12 Pursuant to Government Code, § 65589.5(h)(6)(D)(iv), in the Housing Accountability Act (under AB 1633)
13 Berkeley Downtown Area Plan, p. ED-5.
14 Ibid.

Page 7 of 132 ends
Page 11 ends

ZAB Appeal: 2274 Shattuck Avenue PUBLIC HEARING
Use Permit #ZP2023-0079 April 22, 2025

Page 8 ends

specifically applied to the Project. The Project complies with the policy by preserving as much of the existing theater as is feasible – the front façade and the lobby area. A Structural Review Memo, dated January 24, 202415 was submitted by the applicant’s structural engineer to the LPC for its landmark review which concluded that substantial demolition of the theater building would be required in order to bring it into compliance with current seismic and building code, if preservation of the larger building were considered. Instead, the ZAB found that the Project is consistent with all applicable objective General Plan and Downtown Area Plan goals and policies, as discussed in the ZAB staff report (see Attachment 4), and approved the Project in accordance with state housing permit streamlining requirements.

Issue 3:

The project description relied upon in ZAB's review is not finite or stable, and is inadequate for consideration for categorical exemption, per the applicant's recent public assertions that the application will be substantially modified.

Response:

Staff determined that the CEQA exemption applies to the project that is described in the use permit #ZP2023-0079, and that is represented in the plans that are attached to the permit. Any substantial change to the project as approved that meets the revision thresholds specified in BMC Section 23.404.070, Permit Modifications16 will be required to undergo a Use Permit Modification that is subject to a new staff review (including any review required pursuant to CEQA) and decision by the ZAB on the modified project. To date, no application to modify the approved project has been submitted to the City.

Issue 4:

Appellant asserts that there was a potential “due process violation” in the ZAB proceedings, based on a representation in the applicant’s letter to ZAB that “the City approved the Class 32 categorical exemption in October of 2024 after deliberation by the City Council and in consultation with the City Attorney”, where there has been no public review before any City Council deliberation regarding the subject categorical exemption.

Response:

Staff reviewed the Project in accordance with the regulations and timeframes set forth in AB 163317 that apply to projects which invoke the law to ensure that the City determines a project exempt from CEQA when it is eligible. The AB 1633 Notice was received from 15 See “Structural Review for LPC hearing”, in the Administrative Record, page 2691. 16 https://berkeley.municipal.codes/BMC/23.404.070
17 Pursuant to Government Code, § 65589.5(h)(6)(D) in the HAA.

Page 8 of 132 ends
Page 12 ends

ZAB Appeal: 2274 Shattuck Avenue PUBLIC HEARING
Use Permit #ZP2023-0079 April 22, 2025

Page 9 ends

the applicant on March 4, 2024. A local agency is required by law to make a lawful determination on the project’s eligibility for a CEQA exemption within 90 days of the written notice, and may extend the time period up to 90 days, if needed.18 Staff issued the determination letter on October 4, 2024, following 180 days and a tolling agreement signed with the applicant to extend the deadline by 30 days. Because the project application was required to appear at public meetings before the LPC for the Structural Alteration Permit and the DRC for Preliminary Design Review prior to appearing before the ZAB for a decision, significant lead times that are typically required for public hearings (for staff review, staff report writing, noticing, and commission materials publishing) necessitated that staff make the CEQA exemption determination prior to appearing before the ZAB. It is acceptable under CEQA, and a common practice, for exemption determinations to be made at the staff level.

The City Council met in closed session on September 24, 2024, as noticed on the Council hearing agendas webpage19, to discuss potential litigation related to the City’s consideration of the exemption determination for the Project under CEQA. No public discussion regarding the CEQA determination is required by AB 1633/HAA, and none was conducted prior to the determination.

Issue 5:

The ZAB was not provided with all relevant City reports from architectural historians regarding the UA Berkeley (Theater).

Response:

The City Consultant’s peer review of the historic resource reports and supplemental PIA were publicly released on October 4, 2024, concurrently with the CEQA Determination Letter. Staff used the 180 days provided by law, as well as an additional 30 days per a written agreement with the applicant, to consider all of the evidence on the record, including consultation with the City Attorney, in order to make the determination of CEQA exemption.

Also, as discussed in the previous appeal point response, staff had already made the exemption determination prior to the ZAB hearing on December 12, 2024. Though all technical reports were publicly available well in advance of the hearing, the reports staff relied upon were not necessary for ZAB’s deliberation on whether to approve or disapprove the Project’s use permit.
18 Pursuant to HAA, Government Code, § 65589.5(h)(6)(D)(V)(ic) (2024). 19 The City Council agenda for September 24, 2024 is at this link: https://berkeleyca.gov/city-council- closed-meeting-eagenda-september-24-2024

Page 9 of 132 ends
Page 13 ends

ZAB Appeal: 2274 Shattuck Avenue PUBLIC HEARING
Use Permit #ZP2023-0079 April 22, 2025

Page 10 ends

ENVIRONMENTAL SUSTAINABILITY
The project approved by the ZAB is compliant with all applicable State and local environmental requirements, would be located in a transit-rich area, and would be built and operated according to current codes for energy conservation, waste reduction, low toxicity, and other factors.

ALTERNATIVE ACTIONS CONSIDERED
Pursuant to BMC Section 23.410.040(G), the Council may (1) continue the public hearing, (2) reverse, affirm, or modify the ZAB’s decision, or (3) remand the matter to the ZAB. The April 22, 2025 City Council appeal hearing represents the fourth public hearing for the Project, pursuant to Government Code Section 65905.5(a). The City can hold one additional public hearing for a decision on the Project.

Action Deadline:

Pursuant to BMC Section 23.410.040(I), if the disposition of the appeal has not been determined within 30 days from the date the public hearing was closed by the Council (not including Council recess), then the decision of the Board shall be deemed affirmed and the appeal shall be deemed denied.

CONTACT PERSONS
Jordan Klein, Director, Planning & Development Department, (510) 981-7534 Anne Hersch, Land Use Planning Manager, (510) 981-7411
Sharon Gong, Principal Planner, (510) 981-7429
Attachments:

1. Draft Resolution
 Exhibit A: Findings and Conditions
o Exhibit 1 to Findings and Conditions: AB 1633 CEQA Exemption Determination Letter, dated October 4, 2024
 Exhibit B: Project Plans, received December 8, 2023

2. AB 1633 Notice from Hanson Bridgett, LLC, dated March 4, 2024

3. Appeal Letter, dated received January 13, 2025

4. December 12, 2024 ZAB Staff Report

5. Index to Administrative Record

6. Administrative Record

7. Public Hearing Notice

Page 10 of 132 ends
Page 14 ends

RESOLUTION NO. ##,###-N.S.

AFFIRMING THE ZONING ADJUSTMENTS BOARD APPROVAL OF USE PERMIT #ZP2023-0079 TO DEMOLISH THE COMMERCIAL BUILDING (PRESERVING AND RENOVATING THE FRONT FAÇADE AND LOBBY), AND CONSTRUCT A 17-STORY (183 FEET, PLUS 5-FOOT PARAPET), 214,032-SQUARE-FOOT, MIXED-USE RESIDENTIAL BUILDING WITH 227 DWELLING UNITS (INCLUDING 23 VERY LOW-

INCOME DENSITY BONUS QUALIFYING UNITS), AND ONE ADA PARKING SPACE,

AND DISMISS THE APPEAL
WHEREAS, on November 29, 2022, Isaiah Stackhouse, Trachtenberg Architects (“applicant”) submitted a Preliminary Application to vest rights pursuant to Senate Bill (SB) 330, the Housing Crisis Act of 2019 (Government Code Sections 65941.1 and 66300), for a housing development project; and
WHEREAS, on June 2, 2023, Isaiah Stackhouse submitted Use Permit application #ZP2023-0079 to demolish the commercial building on a landmarked site (preserving and renovating the front façade and lobby), and construct a 17-story, mixed-use building with 227 dwelling units (“project”); and
WHEREAS, on December 5, 2023, staff received Landmark Initiation application #LMIN2023-0003, submitted by members of Save the UA Theater organization; and WHEREAS, on January 4, 2024, staff deemed the Use Permit application complete; and WHEREAS, on February 1, 2024, the Landmarks Preservation Commission (LPC) reviewed the demolition referral and Landmark Initiation application #LMIN2023-0003, and designated the United Artists (UA) Theater building a City Landmark, and the Notice of Decision (NOD) was issued thereafter, and became effective on March 20, 2024; and WHEREAS, on November 21, 2024, the project was reviewed by the Design Review Committee (DRC) for Preliminary Design Review (application #DRCP2023-0008), and provided a favorable recommendation to the ZAB with conditions and recommendations for Final Design Review; and
WHEREAS, on March 4, 2024, the Applicant’s attorney, Hanson Bridgett, LLP, submitted an Assembly Bill (AB) 1633 Notice with attached technical reports to support a California Environmental Quality Act (CEQA) Categorical Exemption for Infill projects; and WHEREAS, on October 4, 2024, upon review of all evidence on the record, staff determined the project to be exempt from CEQA under the Class 32 Categorical Exemption for “In-Fill Development Projects”; and
WHEREAS, on November 26, 2024, staff mailed and posted a Notice of Public Hearing for the project at the site and at nearby locations, and mailed notices to property owners and occupants within 300 feet of the project site, and to all registered neighborhood groups that cover this area; and

Page 11 of 132 ends
Page 15 ends
Page 2 ends

WHEREAS, on December 12, 2024, the Zoning Adjustments Board (ZAB) conducted a public hearing for the use permit, and after hearing public comments and holding discussion, the ZAB approved the use permit by a vote of 8-0-0-1 (Yes: Duffy, Plese, Capitelli, Jersey, Sanderson, Thompson, Gaffney, Allen; No: None; Abstain: None;

Absent: Kashani); and
WHEREAS, on December 30, 2024, staff issued the notice of the ZAB decision; and WHEREAS, on January 13, 2025, the City Clerk received an appeal filing from Brandt- Hawley Law Group on behalf of Save the UA Berkeley; and WHEREAS, on or before March 8, 2025, staff mailed and posted a Notice of Public Hearing at the site and at nearby locations, and mailed notices to property owners and occupants within 300 feet of the project site, and to all registered neighborhood groups that cover this area; and
WHEREAS, on April 22, 2025, the Council held a public hearing to consider the ZAB’s decision, and in the opinion of this Council, the facts stated in, or ascertainable from the public record, including the staff report and comments made at the public hearing, warrant approving the project.

NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Berkeley that the City Council hereby adopts the findings made by the ZAB in Exhibit A to affirm the decision of the ZAB to approve Use Permit #ZP2022-0144, adopts the conditions of approval in Exhibit A; adopts the project plans in Exhibit B; and dismisses the appeal.

Exhibits
 Exhibit A: Findings and Conditions
o Exhibit 1 to Findings and Conditions: AB 1633 CEQA Exemption Determination Letter, dated October 4, 2024
 Exhibit B: Project Plans, received December 8, 2023

Page 12 of 132 ends
Page 16 ends

A t t a c h m e n t 1, Exhibit A
F i n d i n g s a n d C o n d i t i o n s
APRIL 22, 2025
1947 Center Street, Berkeley, CA 94704 Tel: 510.981.7410 TDD: 510.981.7474 Fax: 510.981.7420 Email [email protected]
2274 Shattuck Avenue
Use Permit #ZP2023-0079 to demolish the commercial building (preserving and renovating the front façade and lobby), and construct a 17-story (183 feet, plus 5-foot parapet), 214,032-square-foot, mixed-use residential building with 227 dwelling units (including 23 Very Low-Income Density Bonus qualifying units), and one ADA parking space.

ZONING PERMITS REQUIRED
 Use Permit under BMC Section 23.326.070(A) to demolish a non-residential building  Use Permit under BMC Section 23.204.020(A) to construct a new mixed-use residential development
 Use Permit under BMC Section 23.204.020(A) to construct dwelling units  Use Permit under BMC Section 23.204.030(B)(1) to create new floor area of 10,000 square feet or more
 Use Permit under BMC Section 23.204.130(E)(1) to exceed the maximum building height limit, up to 75 feet (plus 5-foot parapet, by right)
 Use Permit under BMC Section 23.04.130(E)(3)(b) to modify front and side setback requirements
 Administrative Use Permit under BMC Section 23.304.050(A) to exceed building height limits with rooftop architectural elements which exceed the maximum height limit for the district CONCESSIONS/WAIVERS UNDER GOVERNMENT CODE SECTION 65915-65918  Concession – none.
 Waiver of BMC Section 23.04.130(E)(1) to exceed building height limits – to be 183 feet to roof (plus 5-foot parapet, by right), where 75 feet is the limit (plus 5-foot parapet by right)  Waiver of BMC Section 23.204.130(E)(3)(b) to waive front and side setback minimums  Waiver of BMC Section 23.204.130(E)(3) to increase front setback maximum to 7-foot, 1 inch, where 5 feet maximum is required, at 0-20-foot building height  Waiver of BMC Section 23.204.130(E)(3)(b)(i) to exceed 120 feet in width in diagonal measurement above 120 feet in height – to be 178 feet, 9 inches in width, where 120 feet is required
 Waiver of BMC Section 23.204.130(E)(4) to reduce the usable open space requirement – to provide 7,737 square feet, where 18,160 square feet is required  Waiver of BMC Section 23.322.090(A) to provide 72 long term residential bicycle parking, where 210 is required

Page 13 of 132 ends
Page 17 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 2 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
I. CEQA FINDINGS
A. On October 4, 2024, the City determined that the project is categorically exempt from the provisions of CEQA under Section 15332 (“Infill Development Projects”) of the CEQA Guidelines, pursuant to Assembly Bill (AB) 1633. (See Exhibit A.) The project applicant filed an AB 1633 Notice with the City on March 4, 2024 and attached technical reports that supported the project’s eligibility for a Class 32 Categorical Exemption from CEQA and the inapplicability of any Exceptions to the exemption (CEQA Guidelines, Section 15300.2). Submitted technical reports included the following: Traffic Impact Analysis, Historic Resources Evaluation, Project Impacts Analysis, Air Quality Impacts Analysis, Noise Impact Analysis, and Water Quality Impact Analysis. All technical reports were peer reviewed by a CEQA consultant, and were revised or supplemented for adequacy.

B. Upon review of all evidence on the record, the City determined that the project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA, Public Resources Code §21000, et seq. and California Code of Regulations, §15000, et seq.) pursuant to Section 15332 (“Infill Development Projects”) of the CEQA Guidelines.

The project meets the requirements under CEQA Guidelines Section 15332, as follows:

1. The project is consistent with the applicable General Plan designation and policies, and with the applicable zoning designation and regulations.

2. The project occurs within the Berkeley City limits on a project site of no more than five acres, and is surrounded by urban uses.

3. The parcels within the project site have previously been developed and have no value as habitat for endangered, rare or threatened species.

4. The project would not result in any significant effects relating to traffic, noise, air quality or water quality. The Traffic Impact Analysis prepared for the project was reviewed by the City Transportation Division which concurred with the findings of less than significant impacts.

City Standard Conditions would address potential impacts related to traffic, noise, air quality, and water quality.

5. The site can be adequately served by all required utilities and public services.

C. Furthermore, none of the exceptions in CEQA Guidelines Section 15300.2 apply, as follows:
(a) the site is not located in an environmentally sensitive area, (b) there are no cumulative impacts, (c) there are no significant effects on the environment due to unusual circumstances, (d) the project is not located near a scenic highway, (e) the project site is not located on a hazardous waste site pursuant to Government Code Section 65962.5, and (f) the project would not cause a substantial adverse change in the significance of any historical resource.

Page 14 of 132 ends
Page 18 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 3 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
II. HOUSING ACCOUNTABILITY ACT FINDINGS
A. The Housing Accountability Act, Government Code Section 65589.5(j) requires that when a proposed housing development complies with applicable, objective general plan and zoning standards, a local agency may not deny the project or approve it with reduced density unless the agency makes written findings supported by substantial evidence that: (1) the development would have a specific adverse impact on public health or safety unless disapproved or approved at a lower density; and (2) there is no feasible method to satisfactorily mitigate or avoid the specific adverse impact, other than the disapproval or approval at a lower density.

B. The project includes construction of 227 dwelling units. Because the base project complies with applicable, objective general plan and zoning standards, §65589.5(j) does apply to this project. No significant, quantifiable, direct and unavoidable impacts, based on objective, identified written public health or safety standards, polices, or conditions, have been identified.

III. DENSITY BONUS FINDINGS
A. Pursuant to Government Code Section 65915, the Zoning Adjustments Board finds that:

1. Under the City’s methodology for implementing density bonuses, the “base project” consists of 151 units;

2. The project will provide at least 23 Very Low-Income (VLI) qualifying units in the 151-unit “base project”;

3. The project is entitled to a density increase of 50 percent over the otherwise maximum allowable residential density under the Zoning Ordinance and General Plan Land Use Element, under the requirements of Government Code Section 65915(b) and (f), plus three concessions or incentives. This equates to a density bonus of 76 units above the Base Project, for a total of 227 units.

B. In accordance with Government Code Section 65915(e) the Zoning Adjustments Board hereby grants the following waivers to modify development standards as necessary to accommodate these density bonus units:

1. Waiver of BMC Section 23.04.130(E)(1) to exceed building height limits – to be 183 feet to roof (plus 5-foot parapet, by right), where 75 feet is the limit (plus 5-foot parapet by right)

2. Waiver of BMC Section 23.204.130(E)(3)(b) to waive front and side setback minimums

3. Waiver of BMC Section 23.204.130(E)(3) to increase front setback maximum to 7-foot, 1 inch, where 5 feet maximum is required, at 0-20-foot building height

4. Waiver of BMC Section 23.204.130(E)(3)(b)(i) to exceed 120 feet in width in diagonal measurement above 120 feet in height – to be 178 feet, 9 inches in width, where 120 feet is required

5. Waiver of BMC Section 23.204.130(E)(4) to reduce the usable open space requirement – to provide 7,737 square feet, where 18,160 square feet is required

6. Waiver of BMC Section 23.322.090(A) to provide 72 long term residential bicycle parking, where 210 is required
D. In accordance with Government Code Section 65915(e), in order to allow construction of the proposed project with the density permitted under State law, the Zoning Adjustments Board finds approval of waivers is required 1) construct the proposed project at the density permitted under State law; 2) approval of requested waivers will not have a specific adverse impact upon

Page 15 of 132 ends
Page 19 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 4 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
public health and safety, or the physical environment, or on any real property listed in the California Register of Historical Resources; and 3) approval of the requested waivers will not be contrary to State or Federal law.

IV. FINDINGS FOR APPROVAL
A. As required by Section 23.406.040(E) of the BMC, the project, under the circumstances of this particular case existing at the time at which the application is granted, will not be detrimental to the health, safety, peace, morals, comfort, and general welfare of the persons residing or working in the neighborhood of such proposed use or be detrimental or injurious to property and improvements of the adjacent properties, the surrounding area or neighborhood, or to the general welfare of the City because:

1. The project is consistent with all applicable C-DMU District standards and qualifies for waivers and concessions for the listed district standards granted pursuant to State Density Bonus, Government Code, Section 65915;

2. New shadow impacts will occur: a) in the summer months in the hours after sunrise on the residential buildings at 2120 Bancroft Way and 2020 Kittredge Street to the west, and in the hours before sunset on the mixed-use residential buildings at 2295 and 2319 Shattuck Avenue to the east; and b) in the winter months in the hours after sunrise on the residential buildings at 2020 Kittredge Street to the west, and in the hours before sunset on the mixed- use residential building at 2231 Shattuck Avenue to the east. All other new shadows will impact commercial buildings in the vicinity. The extent of the new shadow impact from the project on the site’s adjacent areas will not be unreasonable for a development in the dense, downtown district that allows building heights up to 60-foot, with zero to five-foot setbacks from property lines, by right.

3. The project will be subject to the City’s standard conditions of approval regarding construction noise and air quality, waste diversion, toxics, and stormwater requirements, which will ensure that the project will not be detrimental to the health, safety, peace, morals, comfort or general welfare of persons residing or working in the area or neighborhood of such proposed use or be detrimental or injurious to property and improvements of the adjacent properties, the surrounding area or neighborhood or to the general welfare of the City.

V. OTHER FINDINGS FOR APPROVAL
A. As required by BMC Section 23.326.070(A), in order to approve a Use Permit to demolish a commercial structure, the Zoning Adjustments Board finds that:

1. Although proposed demolition of the majority of the existing movie theater building will replace the existing commercial building with a mixed-use residential building that would reduce the amount of commercial floor area on the site, the project will not be materially detrimental to the commercial needs and public interest of the neighborhood because the movie theater business ceased operations in February 2023, and the new project will contain a ground-floor café, to bring more services to residents and workers in the vicinity.

2. The existing structure to be demolished is a 23,289-square-foot movie theater. This commercial use will be replaced by a 865-square-foot café and 227 new residential units, including 23 very low-income affordable units. The demolition is required in order to allow the proposed mixed-use residential project to be built.

Page 16 of 132 ends
Page 20 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 5 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx

3. The LPC reviewed the demolition referral for the project and did not recommend against the demolition permit.

B. As required by BMC Section 23.204.130(I) of the, the Zoning Adjustments Board finds that the proposed use or structure:

1. Is compatible with the purposes of the district to implement the vision and goals of the Downtown Area Plan (DAP):
a. Environmental Sustainability and Access: The project will be a high-density development in proximity to regional transit, shops and amenities, and will provide more housing in the Downtown to increase access to local services and amenities by foot, by bicycle and via transit, while promoting public transit as an efficient and attractive choice through its location and through its Transportation Demand Management measures and other associated Conditions of Approval. The project is designed to achieve GreenPoint Rated Silver certification, which is equivalent to LEED Gold, and satisfies this DAP requirement.

The project will also comply with the State’s Model Water Efficient Landscape Ordinance (MWELO), and will feature a number of native plant species in its landscape palette. b. Land Use: The mixed-use residential project, which includes 23 VLI units, will add affordable housing to the Downtown area. The rehabilitated movie theater front façade and café (repurposed from a theater lobby) will contribute to the area’s vitality, livability, sustainability, and character. New street trees and landscaping along Bancroft Way will add to the cultivation of the Downtown as an attractive residential neighborhood. c. Housing and Community Health and Services:

The project will involve construction of a
mixed-use residential building with a total of 227 dwelling units, including 23 VLI units.

The project will expand the supply of affordable housing and contribute to a thriving, livable, diverse residential neighborhood with a mix of supportive uses in Downtown. d. Economic Development: The project will introduce 227 new residential units, in a mix of unit sizes – studio, two-bedroom and four-bedroom units – and 23 very low-income units to the neighborhood, to help broaden the range of household incomes in the area and contribute to diversifying housing opportunities for households of different ages, incomes, varying sizes, and abilities in the Downtown, while preserving the character of the Downtown Historic neighborhood through the rehabilitation of the UA Theater façade. e. Historic Preservation and Urban Design:

The 2274 Shattuck building, also known as the
United Artists Theater, is an historic resource listed in the CRHR and was found to be eligible for NAHP designation, as well as a contributor to the Shattuck Avenue Commercial Corridor Historic District. The LPC designated the building a City Landmark in February 2024, with the upper portion of the Shattuck Avenue building façade as the distinguishing features to be preserved and restored . The project will demolish the entire building, excepting the Shattuck Avenue façade and theater lobby, which will be rehabilitated and repurposed.
f. Streets and Open Space:

The project will include new street trees along Bancroft Way and 7,737 square feet of private open space in the form of private patios, ground-floor common space and a roof deck for residents, that will comply with the State’s MWELO requirements. In addition, the project will be required to contribute to the Streets and Open Space Improvement Plan (SOSIP) fund via Condition of Approval.

Page 17 of 132 ends
Page 21 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 6 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx

2. Is compatible with surrounding uses and buildings: Uses on properties surrounding the project site include retail, the Berkeley Public Library, restaurants, retail and offices, and multi-family residential. The project features primarily a multi-family residential use with a ground-floor café, a similar mixture of uses that already exists on the site and in the vicinity.

Thus, the project will not introduce new land uses that do not already exist in the Downtown, and will further the vision and goals of the DAP. The DRC provided a favorable recommendation of the project with conditions for further design refinement, and deemed the project consistent with DAP design guidelines.

C. As required by Section 23.304.050(A) of the BMC, the Zoning Adjustments Board finds that the proposed rooftop equipment, which exceeds the district height limit, does not exceed 15 percent the average floor area of the building’s floors. None of the equipment structures will be used as habitable or commercial space. The project will include mechanical and staircase/elevator penthouses and an architectural frame totaling 1,891 square feet on the roof that will extend 15 feet over the roof height. These areas represent 15 percent of the 12,659- square-foot average of all the floor areas.

D. As required by BMC Section 23.204.130(E), the Zoning Adjustments Board finds that:

1. The setback encroachment in the Base Project will result in a minimal contribution to new shadow impact relative to the increase in shadow impact from the Density Bonus project height and reduced setbacks that are requested as waivers. Thus, the setback reduction the Base Project will not unreasonably limit solar access.

2. A Wind and Comfort Impact Analysis was prepared in March, 2022 for an approved use permit at 2190 Shattuck, a site that is one block to the east of the subject site, for a 25- story building proposal with zero to five-foot setbacks up to 268 feet in height, that concluded that the building will not cause significant additional wind impact on the street level at Shattuck Avenue and Allston Way. Based on that study, the project, which consists of a 17-story building with similar setback reductions up to 183 feet in height, will also result in insignificant changes to wind patterns on the sidewalk at the site along Shattuck Avenue or Bancroft Way.

VI. STANDARD CONDITIONS OF APPROVAL FOR ALL PROJECTS
The following conditions, as well as all other applicable provisions of the Zoning Ordinance, apply to this Permit:

1. Conditions Shall be Printed on Plans. The conditions of this Permit shall be printed on the second sheet of each plan set submitted for a building permit pursuant to this Use Permit, under the title ‘Use Permit Conditions.’ Additional sheets may also be used if the second sheet is not of sufficient size to list all of the conditions. The sheet(s) containing the conditions shall be of the same size as those sheets containing the construction drawings.

2. Compliance Required (BMC Section 23.102.050). All land uses and structures in Berkeley must comply with the Zoning Ordinance and all applicable City ordinances and regulations.

Compliance with the Zoning Ordinance does not relieve an applicant from requirements to comply with other federal, state, and City regulations that also apply to the property.

3. Approval Limited to Proposed Project and Replacement of Existing Uses (BMC Sections

23.404.060(B)(1) and (2)):

Page 18 of 132 ends
Page 22 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 7 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
A. This Permit authorizes only the proposed project described in the application. In no way does an approval authorize other uses, structures or activities not included in the project description.

B. When the City approves a new use that replaces an existing use, any prior approval of the existing use becomes null and void when permits for the new use are exercised (e.g., building permit or business license issued). To re-establish the previously existing use, an applicant must obtain all permits required by the Zoning Ordinance for the use.

4. Conformance to Approved Plans (BMC Section 23.404.060(B)(4)).

All work performed under an approved permit shall comply with the approved plans and any conditions of approval.

5. Exercise and Expiration of Permits (BMC Section 23.404.060(C)):

A. A permit authorizing a land use is exercised when both a valid City business license is issued (if required) and the land use is established on the property.

B. A permit authorizing construction is exercised when both a valid City building permit (if required) is issued and construction has lawfully begun.

C. The Zoning Officer may declare a permit lapsed if it is not exercised within one year of its issuance, except if the applicant has applied for a building permit or has made a substantial good faith effort to obtain a building permit and begin construction. The Zoning Officer may declare a permit lapsed only after 14 days written notice to the applicant. A determination that a permit has lapsed may be appealed to the ZAB in accordance with Chapter 23.410 (Appeals and Certification).

D. A permit declared lapsed shall be void and of no further force and effect. To establish the use or structure authorized by the lapsed permit, an applicant must apply for and receive City approval of a new permit.

6. Permit Remains Effective for Vacant Property (BMC Section 23.404.060(D)). Once a Permit for a use is exercised and the use is established, the permit authorizing the use remains effective even if the property becomes vacant. The same use as allowed by the original permit may be re-established without obtaining a new permit, except as set forth in Standard Condition #5 above.

7. Permit Modifications (BMC Section 23.404.070). No change in the use or structure for which this Permit is issued is permitted unless the Permit is modified by the Board. The Zoning Officer may approve changes to plans approved by the Board, consistent with the Board’s policy adopted on May 24, 1978, which reduce the size of the project.

8. Permit Revocation (BMC Section 23.404.080). The City may revoke or modify a discretionary permit for completed projects due to: 1) violations of permit requirements; 2) Changes to the approved project; and/or 3) Vacancy for one year or more. However, no lawful residential use can lapse, regardless of the length of time of the vacancy. Proceedings to revoke or modify a permit may be initiated by the Zoning Officer, Zoning Adjustments Board (ZAB), or City Council referral.

9. Pay Transparency Acknowledgement (BMC Section 13.104.030). Prior to the issuance of a building permit for any Project subject to this Chapter:

Page 19 of 132 ends
Page 23 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 8 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
A. A Responsible Representative of the Permittee shall certify under penalty of perjury that:
(1) the Permittee has reviewed Chapter 13.104 of the Berkeley Municipal Code; and (2) the Permittee will be responsible for demonstrating compliance with this Chapter.

B. The Permittee shall provide to the City a Contractor Pay Transparency Acknowledgment on a form approved by the City for this purpose. A Responsible Representative of the Permittee shall certify under penalty of perjury that the Contractor and all Qualifying Subcontractors performing work on the Project will comply with Chapter 13.104 of the Berkeley Municipal Code and with Labor Code sections 226(a) and 2810.5 for each employee who works on the Project.

10.Pay Transparency Attestations following Project Completion (BMC Section 13.104.040).

Within 10 days of the approved final inspection of any Project subject to this Chapter, each Permittee shall provide to the City for each Contractor and Qualifying Subcontractor a Pay Transparency Attestation on a form approved by the City. On each Pay Transparency Attestation, a Responsible Representative of the Contractor or Qualifying Subcontractor shall attest under penalty of perjury that the Contractor or Qualifying Subcontractor complied with Chapter 13.104 of the Berkeley Municipal Code and Labor Code sections 226(a) and 2810.5 for each employee who performed work on the Project. The City will maintain Pay Transparency Attestation forms for period of at least three years after their date of receipt by the City.

11.Posting of Wage Theft Ordinance (BMC Section 13.104.050). Each day work is performed on the Project, each Permittee shall post, and keep posted in a conspicuous location where it may be easily read by employees during the hours of the workday, a notice that: (A) contains the text of Chapter 13.104 of the Berkeley Municipal Code; (B) explains that workers can report violations of Labor Code sections 226 and 2810.5 to the Labor Commissioner of the State of California; and (C) provides current contact information, including office address, telephone number, and email address of the Labor Commissioner of the State of California.

12.Wage Theft Prevention Conditions of Approval (BMC Section 13.104.060). The requirements of Sections 13.104.030 through 13.104.050 shall be included as conditions of approval of any Use Permit or Zoning Certificate for any Project that is subject to this Chapter.

Failure to comply with the requirements of any provision of this Chapter shall be grounds for issuance of an administrative citation under Chapter 1.28 and/or the revocation or modification of any Use Permit issued for the Project under BMC Chapter 23.404.

Page 20 of 132 ends
Page 24 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 9 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx

13.Hold Harmless. The permittee agrees as a condition of approval of this application to indemnify, protect, defend with counsel selected by the City, and hold harmless, the City, and any agency or instrumentality thereof, and its elected and appointed officials, officers, employees and agents, from and against any and all liabilities, claims, actions, causes of action, proceedings, suits, damages, judgments, liens, levies, costs and expenses of whatever nature, including reasonable attorney’s fees and disbursements (collectively, “Claims”) arising out of or in any way relating to the approval of this application, any actions taken by the City related to this entitlement, or any environmental review conducted under the California Environmental Quality Act, Public Resources Code Section 210000 et seq., for this entitlement and related actions. The indemnification shall include any Claims that may be asserted by any person or entity, including the permittee, arising out of or in connection with the approval of this application, whether or not there is concurrent, passive or active negligence on the part of the City, and any agency or instrumentality thereof, and its elected and appointed officials, officers, employees and agents. The permittee’s duty to defend the City shall not apply in those instances when the permittee has asserted the Claims, although the permittee shall still have a duty to indemnify, protect and hold harmless the City.

VII. ADDITIONAL CONDITIONS IMPOSED BY THE ZONING ADJUSTMENTS BOARD Pursuant to BMC 23.404.050(H), the Zoning Adjustments Board attaches the following additional conditions to this Permit:

Prior to Submittal of Any Building Permit:

14.Project Liaison. The applicant shall include in all building permit plans and post onsite the name and telephone number of an individual empowered to manage construction-related complaints generated from the project. The individual’s name, telephone number, and responsibility for the project shall be posted at the project site for the duration of the project in a location easily visible to the public. The individual shall record all complaints received and actions taken in response, and submit written reports of such complaints and actions to the project planner on a weekly basis. Please designate the name of this individual below:
 Project Liaison ____________________________________________________ Name Phone #

15.Address Assignment. The applicant shall file an “Address Assignment Request Application” with the Permit Service Center (1947 Center Street) for any address change or new address associated with this Use Permit. The new address(es) shall be assigned in accordance with BMC 16.28.030, and, except for new buildings on vacant lots, entered into the City’s database after the building permit is issued but prior to final inspection.

16.Construction Noise Reduction Program. The applicant shall develop a site-specific noise reduction program prepared by a qualified acoustical consultant to reduce construction noise impacts to the maximum extent feasible, subject to review and approval of the Zoning Officer.

The noise reduction program shall include the time limits for construction listed above, as measures needed to ensure that construction complies with BMC Section 13.40.070. The noise reduction program should include, but shall not be limited to, the following available controls to reduce construction noise levels as low as practical:

Page 21 of 132 ends
Page 25 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 10 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
A. Construction equipment should be well maintained and used judiciously to be as quiet as practical.

B. Equip all internal combustion engine-driven equipment with mufflers, which are in good condition and appropriate for the equipment.

C. Utilize “quiet” models of air compressors and other stationary noise sources where technology exists. Select hydraulically or electrically powered equipment and avoid pneumatically powered equipment where feasible.

D. Locate stationary noise-generating equipment as far as possible from sensitive receptors when adjoining construction sites. Construct temporary noise barriers or partial enclosures to acoustically shield such equipment where feasible.

E. Prohibit unnecessary idling of internal combustion engines.

F. If impact pile driving is required, pre-drill foundation pile holes to minimize the number of impacts required to seat the pile.

G. Construct solid plywood fences around construction sites adjacent to operational business, residences or other noise-sensitive land uses where the noise control plan analysis determines that a barrier would be effective at reducing noise.

H. Erect temporary noise control blanket barriers, if necessary, along building facades facing construction sites. This mitigation would only be necessary if conflicts occurred which were irresolvable by proper scheduling. Noise control blanket barriers can be rented and quickly erected.

I. Route construction related traffic along major roadways and away from sensitive receptors where feasible.

17.Damage Due to Construction Vibration. The project applicant shall submit screening level analysis prior to, or concurrent with demolition building permit. If a screening level analysis shows that the project has the potential to result in damage to structures, a structural engineer or other appropriate professional shall be retained to prepare a vibration impact assessment (assessment). The assessment shall consider project specific information such as the composition of the structures, location of the various types of equipment used during each phase of the project, as well as the soil characteristics in the project area, in order to determine whether project construction may cause damage to any of the structures identified as potentially impacted in the screening level analysis. If the assessment finds that the project may cause damage to nearby structures, the structural engineer or other appropriate professional shall recommend design means and methods of construction that to avoid the potential damage, if feasible. The assessment and its recommendations shall be reviewed and approved by the Building and Safety Division and the Zoning Officer. If there are no feasible design means or methods to eliminate the potential for damage, the structural engineer or other appropriate professional shall undertake study of existing conditions (study) of any structures (or, in case of large buildings, of the portions of the structures) that may experience damage.

Page 22 of 132 ends
Page 26 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 11 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx

1. This study shall establish the baseline condition of these structures, including, but not limited to, the location and extent of any visible cracks or spalls; and include written descriptions and photographs.

2. The study shall be reviewed and approved by the Building and Safety Division and the Zoning Officer prior to issuance of a grading permit. Upon completion of the project, the structures (or, in case of large buildings, of the portions of the structures) previously inspected will be resurveyed, and any new cracks or other changes shall be compared to pre-construction conditions and a determination shall be made as to whether the proposed project caused the damage. The findings shall be submitted to the Building and Safety Division and the Zoning Officer for review. If it is determined that project construction has resulted in damage to the structure, the damage shall be repaired to the pre-existing condition by the project sponsor, provided that the property owner approves of the repair.

18.Compliance with Conditions of Approval and Environmental Mitigations. The building permit application is subject to verification of compliance of these Conditions of Approval and the DAP Mitigation Monitoring and Reporting Program (Attachment 4). The applicant shall be responsible for demonstrating compliance with all conditions of approval and mitigation measures per the timeline set forth by this use permit. The applicant shall deposit $10,000 with the City, or less with the approval of the Zoning Officer, to pay for the cost of monitoring compliance with these Conditions of Approval and other applicable conditions and regulations.

Should compliance-monitoring expenses exceed the initial deposit, the applicant shall deposit additional funds to cover such additional expenses upon the request of the Zoning Officer; any unused deposit will be refunded to the applicant.

Prior to Issuance of Any Building & Safety Permit (Demolition or Construction)

19.Demolition. Demolition of the existing building cannot commence until a complete application is submitted for the replacement building. In addition, all plans presented to the City to obtain a permit to allow the demolition are subject to these conditions.

20.Construction Noise Management - Public Notice Required. At least two weeks prior to initiating any construction activities at the site, the applicant shall provide notice to businesses and residents within 500 feet of the project site. This notice shall at a minimum provide the following: (1) project description, (2) description of construction activities during extended work hours and reason for extended hours, (3) daily construction schedule (i.e., time of day) and expected duration (number of months), (4) the name and phone number of the Project Liaison for the project that is responsible for responding to any local complaints, and (5) that construction work is about to commence. The liaison would determine the cause of all construction-related complaints (e.g., starting too early, bad muffler, worker parking, etc.) and institute reasonable measures to correct the problem. A copy of such notice and methodology for distributing the notice shall be provided in advance to the City for review and approval.

Page 23 of 132 ends
Page 27 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 12 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx

21.Construction Phases. The applicant shall provide the Zoning Officer with a schedule of major construction phases with start dates and expected duration, a description of the activities and anticipated noise levels of each phase, and the name(s) and phone number(s) of the individual(s) directly supervising each phase. The Zoning Officer or his/her designee shall have the authority to require an on-site meeting with these individuals as necessary to ensure compliance with these conditions. The applicant shall notify the Zoning Officer of any changes to this schedule as soon as possible.

22.Construction and Demolition Diversion. Applicant shall submit a Construction Waste Management Plan that meets the requirements of BMC Chapter 19.37 including 100 percent diversion of asphalt, concrete, excavated soil and land-clearing debris and a minimum of 65 percent diversion of other nonhazardous construction and demolition waste.

23.Toxics. The applicant shall contact the Toxics Management Division (TMD) at 1947 Center Street or (510) 981-7470 to determine which of the following documents are required and timing for their submittal:

A. Phase I and Phase II Environmental Site Assessment (ESA) (per ASTM 1527).

A
recent Phase I ESA (less than 2 years old) shall be submitted to the Toxics Management Division for developments for: all new commercial, industrial and mixed-use developments and all improvement projects that require work 5 or more feet below grade, and all new residential buildings with more than four dwelling units located in the Environmental Management Area (or EMA). The EMA can be viewed at: City of Berkeley Community GIS Portal (arcgis.com)
B. Depending on the findings in the Phase I, a Phase II or additional investigation may be necessary. Any available soils and groundwater analytical data available for projects listed in this section must also be submitted to TMD.

C. Environmental Site Clearance. The applicant shall provide environmental screening clearance from either the San Francisco Bay Regional Water Quality Control Board (RWQCB), Department of Toxic Substances Control (DTSC), or the Alameda County Department of Environmental Health’s Local Oversight Program (LOP). Clearance from one of these regulatory agencies will ensure that the property meets development investigation and cleanup standards for the specific use proposed on the property.

Environmental screening clearance shall be submitted to the City of Berkeley’s Toxics Management Division prior to issuance of any building permits.

D. Soil and Groundwater Management Plan. A site-specific Soil and Groundwater Management Plan (SGMP) shall be submitted to Toxics Management Division (TMD) for all non-residential projects, and residential or mixed-use projects with more than four dwelling units, that: (1) are in the Environmental Management Area (EMA), as shown on the most recent City of Berkeley EMA map, and (2) propose any excavations deeper than 5 feet below grade or if significant soils removal is anticipated. The SGMP shall be submitted to the TMD with the project’s building permit application and shall be approved by TMD prior to issuance of the building permit.

Page 24 of 132 ends
Page 28 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 13 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
The SGMP shall comply with the hazardous materials and waste management standards required by BMC Section 15.12.100, the stormwater pollution prevention requirements of San Francisco Bay Regional Water Quality Control Board’s Order No. R2-2009-0074, California hazardous waste generator regulations (Title 22 California Code of Regulations (CCR) 66260 et seq.), and the East Bay Municipal Utility District’s Ordinance 311, and shall include the following:
i. procedures for soil and groundwater management including identification of pollutants and disposal methods;
ii. procedures to manage odors, dust and other potential nuisance conditions expected during development;
iii. notification to TMD within 24 hours of the discovery of any previously undiscovered contamination; and
iv. the name and phone number of the individual responsible for implementing the SGMP and who will respond to community questions or complaints.

TMD may require additional information or impose additional conditions as deemed necessary to protect human health and the environment. All requirements of the approved SGMP shall be deemed conditions of approval.

E. Demolitions & Renovations – Building Materials Survey. A hazardous materials survey for building materials and plans on hazardous materials and hazardous waste removal and disposal is required and must be prepared by qualified professionals, and submitted to the Toxics Management Division (TMD) prior to issuance of the building permit. i. The survey shall include the identification of all materials to be disturbed for lead- based paints, PCB containing equipment and caulking, hydraulic fluids, refrigerants, treated wood, and mercury containing devices (including fluorescent light bulbs and mercury switches), asbestos and other hazardous materials and chemicals. ii. If asbestos is identified, Bay Area Air Quality Management District Regulation 11-2- 401.3 a notification must be made and the J number must be made available to the City of Berkeley Permit Service Center. Contractors must follow state regulations where there is asbestos-related work involving 100 square feet or more of asbestos containing material (8 Cal. Code Regs. §1529, §341.6 et seq.) iii. The report to the TMD shall include, in addition to the survey, plans on hazardous materials and hazardous waste removal and disposal that comply with State and Federal codes including California Code of Regulations (CCR) 66260 et seq. iv. Documentation evidencing disposal of hazardous waste in compliance with the survey shall be submitted to TMD within 30 days of the completion of the demolition.

Please note, the PCB Screening Form required by Public Works, Engineering, is a separate requirement and does not address the PCB identification requirement of the Toxics Management Division.

Page 25 of 132 ends
Page 29 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 14 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
F. Hazardous Materials Business Plan. A Hazardous Materials Business Plan (HMBP) in compliance with BMC Section 15.12.040 and California Health & Safety Code, Chapter

6.95 Div. 20, shall be submitted to the Toxics Management Division through the California Environmental Reporting System: http://cers.calepa.ca.gov/ for chemicals used or stored on site during construction that exceed reporting thresholds. The reporting is required if your facility stores or handles hazardous materials in aggregate quantities equal to or greater than 55 gallons for liquids, 500 pounds for solids, or 200 cubic feet of compressed gases, or generates any quantity of hazardous waste. This includes welding gases, emergency generator fuel, paints, etc.

Additionally, the business occupant must submit an HMBP within 30 days of starting operations.

G. Petroleum Storage. An (SPCC) Plan is required to be prepared and implemented for facilities with any one of the following:
i. aggregate aboveground petroleum storage capacities of 1,320 gallons or more stored in aboveground storage containers, tanks, oil-filled equipment, or ii. one or more tank(s) in an underground area (TIUGA) with petroleum storage capacities of 55 gallons or greater. More information on TIUGAs can be found here:
https://osfm.fire.ca.gov/divisions/pipeline-safety-and-cupa/certified-unified-program- agency-cupa/aboveground-petroleum-storage-act/tank-in-an-underground-area-tiuga/ The SPCC plan must be prepared prior to beginning operations and you must submit facility information to Toxics Management Division (TMD) through the California Environmental Reporting System: http://cers.calepa.ca.gov/. The SPCC plan will be reviewed during the site inspection and shall not be submitted in CERS or to the TMD.

Prior to Issuance of Any Building (Construction) Permit

24.Historic Resource Inventory. The Applicant shall prepare and submit an Historic Resource Inventory to the Land Use Planning Division prior to Final Design Review (FDR).

25.Final Design Review. The Project requires approval of an FDR application by the Design Review Committee (DRC). The DRC shall review and consider the incorporation of the Historic Resource Inventory submitted by applicant.

26.Percent for Public Art. Consistent with BMC Section 23.316, the applicant shall either pay the required in-lieu fee or provide the equivalent amount in a financial guarantee to be released after installation of the On-Site Publicly Accessible Art.

27.Affordable Housing Mitigation Fee. Consistent with BMC Section 22.20.065, and fee resolution applicable to this project, the applicant shall provide a schedule, consistent with a schedule approved by the City Manager or her designee, outlining the timeframe for payment of the AHMF, and they shall pay this fee.

Page 26 of 132 ends
Page 30 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 15 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx

28.HVAC Noise Reduction. Prior to the issuance of building permits, the project applicant shall submit plans that show the location, type, and design of proposed heating, ventilation, and cooling (HVAC) equipment. In addition, the applicant shall provide product specification sheets or a report from a qualified acoustical consultant showing that operation of the proposed HVAC equipment will meet the City’s exterior noise requirements in BMC Section 13.40.050. The City’s Planning and Development Department shall review the submitted plans, including the selected HVAC equipment, to verify compliance with exterior noise standards.

29.Interior Noise Levels. Prior to issuance of a building permit, the applicant shall submit a report to the Building and Safety Division and the Zoning Officer by a qualified acoustic engineer certifying that the interior residential portions of the project will achieve interior noise levels of no more than 45 Ldn (Average Day-Night Levels). If the adopted Building Code imposes a more restrictive standard for interior noise levels, the report shall certify compliance with this standard.

30.Streets and Open Space Improvement Plan. Street Frontage Improvements. Consistent with the Downtown Streets and Open Space Improvement Plan (SOSIP) (or subsequent iterations as adopted by the City), the developer shall construct improvements along Oxford Street and Center Street to the centerline. Such improvements shall be included with the building permit submittal, designed and constructed as directed by the Public Works Engineering, Public Works Transportation, and Fire Departments, and constructed prior to certificate of occupancy.

31.Streets and Open Space Improvement Plan. Impact Fee: As required by BMC Section

23.204.130(F), the project shall pay an impact fee to implement the Streets and Open Space Improvement Plan (SOSIP) per the fee schedule adopted by the Council by resolution. The City shall deposit this payment into the Downtown Streets and Open Space Improvement Fund (SOSIF), or its equivalent, to pay for the design and construction of the SOSIP Major Projects.

The fee shall apply to the project’s “Gross Floor Area” as defined in BMC Section 23.106.030, less any existing Gross Floor Area removed as part of the project.

At the City's discretion, the City Manager or her designee may reduce the required SOSIP Impact Fee, on a $1 to $1 ratio, as a credit for constructing all or a portion of a Major SOSIP Improvement Project beyond the frontage improvements already required by this Permit. The first half of this fee shall be paid prior to issuance of a building permit, and the second half shall be paid prior to issuance of a certificate of occupancy.

32.Green Building Certification. The applicant shall submit documentation demonstrating that the building will attain LEED Gold or higher, or attain a building performance equivalent to this rating that has been approved by the Zoning Officer for this project. Documentation shall include proof of payment of the registration/application fee to the organization administering the green building certification system (e.g. USGBC/GBCI for LEED, Build It Green for GreenPoint Rated, etc.), a copy of the updated green building checklist that reflects anticipated points, and a statement from the appropriate project team professional (e.g. LEED Accredited Professional, GreenPoint Rater, etc.) verifying that the project is on track for certification at the required level or above. The submitted green building checklist must be a type that is appropriate for the project and a version that is being accepted by the organization granting the green building certification at the time of building permit application. Whenever applicable, measures from the green building checklist shall be incorporated and noted on site plans.

Page 27 of 132 ends
Page 31 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 16 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx

33.Solar Photovoltaic (Solar PV) and Battery Energy Storage Systems (ESS). A solar PV system shall be installed, subject to specific limited exceptions, as specified by the Berkeley Energy Code (BMC Chapter 19.36). Energy storage system (ESS) readiness (new single- family, duplex, and townhouse homes) or ESS installation (new multifamily and most nonresidential buildings) shall be completed as specified by BMC Chapter 19.36. Location of the solar PV system and the ESS, if applicable, shall be noted on the construction plans. (Project required to meet applicable code at time of building permit application, if different from above.)

34.Nonresidential Electric Vehicle (EV) Charging.

At least 10 percent of project parking spaces
for nonresidential use shall have installed Level 2 (40 amp) electric vehicle (EV) charging stations and/or DC Fast Charging Stations, and least 40 percent shall be “EV Capable” equipped with raceway, electrical panel service capacity, and an electrical system to support future Level 2 (40 amp) EV charging stations, or any more stringent EV charging requirements, as specified by the Berkeley Green Code (BMC Chapter 19.37). EV charging station installations and EV Capable spaces shall be noted on the construction plans. Public access parking spaces shall provide any applicable mandatory accessibility provisions. (Project required to meet applicable code at time of building permit application, if different from above.)

35.Water Efficient Landscaping. Landscaping, totaling 500 square feet of more of new landscaping or 2,500 square feet or more of renovated irrigated area, shall comply with the State’s Model Water Efficient Landscape Ordinance (MWELO). MWELO-compliant landscape documentation including a planting, grading, and irrigation plan shall be included in site plans.

Water budget calculations are also required for landscapes of 2,500 square feet or more and shall be included in site plans. The reference evapotranspiration rate (ETo) for Berkeley is

41.8. 36.Recycling and Organics Collection. Applicant shall provide recycling and organics collection areas for occupants, clearly marked on plans, which comply with the Alameda County Organics Reduction and Recycling Ordinance (2021-02). Contact the Zero Waste Division’s Recycling Program Manager, Julia A. Heath, at [email protected].

37.Public Works ADA. Plans submitted for building permit shall include replacement of sidewalk, curb, gutter, and other streetscape improvements, as necessary to comply with current City of Berkeley standards for accessibility.

BELOW MARKET RATE UNITS

38.Affordable Housing Mitigation Fee (AHMF). Consistent with BMC 22.20.065 and fee resolution No. 68,074-N.S., the applicant shall provide a schedule, consistent with a schedule approved by the City Manager or her designee, outlining the timeframe for payment of the AHMF, or provide an alternative to the fee payment as permitted by the BMC. Payment of the AHMF may be reduced if paid prior to the building permit per resolution No. 68,074-N.S., and shall be paid no later than prior to the issuance of a certificate of occupancy for the project.

Page 28 of 132 ends
Page 32 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 17 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
As indicated on the development application, the applicant shall provide below market rate rental dwelling units (“BMR Units”) – 23 VLI units, in perpetuity – and will be required to pay the AHMF as calculated in BMC Section 22.20.065(D). The applicant may elect to avoid the AHMF by providing, for the life of the project, a number of units equal to 20 percent of the total units in the project at rental rates affordable to Low-Income and Very Low-Income Households in accordance with the BMC. The applicant may also elect to provide BMR units below 20 percent of total units for a reduced AHMF as calculated in BMC Section 22.20.065(D). The applicant must contact and coordinate with the Department of Health, Housing and Community Services (HHCS) via email to [email protected] for review and approval. The final number of affordable onsite units must be declared prior to issuance of the first building permit for the project.

39.Number of Below Market Rate Units. The project shall provide below market rate rental dwelling units (“BMR Units”) – 23 VLI units, in perpetuity – which are required to comply with the State Density Bonus Law (Government Code Section 65915) and BMC Section 22.20.065.

The BMR Units shall be designated in the Regulatory Agreement and shall be reasonably dispersed throughout the project; be of the same size and contain, on average, the same number of bedrooms as the non-BMR units in the project; and be comparable with the design or use of non-BMR units in terms of appearance, materials and finish quality. The designation of BMR Units shall conform to the addresses assigned to the building by the City.

40.Affordable Housing: Regulatory Agreement. Prior to the issuance of a building permit, the applicant shall enter into a Regulatory Agreement that implements Government Code Section 65915 and this Use Permit should they elect to provide BMR units to avoid or reduce their AHMF obligation. The Regulatory Agreement shall include any terms and affordability standards determined by the City to be necessary to ensure such compliance. The maximum qualifying household income for very low income BMR Units shall be 50 percent of Area Median Income (AMI), and their maximum housing payment shall be 30 percent of 50 percent of AMI. The maximum qualifying household income for Low Income BMR units shall be 80 percent of Area Median Income (AMI), and their maximum housing payment shall be 30 percent of 80 percent of AMI for Low-Income households, as set forth in the following paragraphs of this condition. If the BMR units are occupied by Very Low-Income tenants receiving a rental subsidy through the Section 8 or Shelter Plus Care programs, the rent received by the project sponsor may exceed the restricted rent to the payment standards allowed under those programs so long as the rent allowed under the payment standards is not greater than the market rents charged for comparable units in the development. The applicant shall submit the Regulatory Agreement to the Department of Health, Housing and Community Services (HHCS) via email to [email protected] for review and approval.

41.Affordable Housing: Below Market Rate Program. In addition, affordable units must adhere to the administrative guidelines for the City’s Below Market Rate program. These guidelines can be found online at https://berkeleyca.gov/community-recreation/affordable-housing- berkeley/below-market-rate-rental-information-owners-and.The guidelines are updated annually by HHCS and posted online. Please note the following key provisions from the guidelines:

A. Maximum rent shall be adjusted for the family size appropriate for the unit pursuant to B. California Health & Safety Code Section 50052.5 (h).

Page 29 of 132 ends
Page 33 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 18 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
C. Rent shall include a reasonable allowance for utilities, as published and updated by the D. Berkeley Housing Authority, including garbage collection, sewer, water, electricity, gas, and other heating, cooking and refrigeration fuels. Such allowance shall take into account the cost of an adequate level of service. Utilities do not include telephone service. Rent also includes any separately charged fees or service charges assessed by the lessor which are required of all tenants, other than security deposits.

E. BMR units will be provided for the life of the project under Section 22.20.065.

F. Determination of Area Median Income (AMI):
 The AMI shall be based on the income standards for the Oakland Primary Metropolitan Statistical Area reported by the United States Department of Housing and Urban Development (HUD). In the event HUD discontinues establishing such income standards, AMI shall be based on income standards determined by the California State Department of Housing and Community Development (HCD). If such income standards are no longer in existence, the City will designate another appropriate source or method for determining the median household income.
 The applicable AMI for the purpose of determining the allowable rent for each unit (but not for the purpose of determining eligibility for occupancy of an inclusionary unit) shall be determined in accordance with the following table:

Unit Size AMI Standard
Studio unit AMI for a one-person household
One-
bedroom unit
AMI for a two-person household
Two-
bedroom unit
AMI for a three-person household
Three-
bedroom unit
AMI for a four-person household

42.Affordable Housing. Nothing in these conditions shall be interpreted to prohibit, or to require modification of the Use Permit or Regulatory Agreement to allow, the provision of additional BMR units, or additional affordability, then are required in the foregoing provisions.

43.Affordable Housing. Dwellings that are approved as rental units, but in which a condo map is approved prior to issuance of an occupancy permit, shall be subject to the affordability requirements within BMC 23.328 in effect on March 31, 2023. (A) Residential housing projects for the construction of five or more Dwelling Units; (B) Residential housing projects for the construction of one to four new Dwelling Units, when such Units are added to an existing one to four-unit property, which has been developed after August 14, 1986, and the resulting number of units totals five or more. All Units in such a property are subject to the requirements of this chapter; (C) Residential housing projects proposed on lots whose size and zoning designation is such to allow construction of five or more Dwelling Units.

Page 30 of 132 ends
Page 34 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 19 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx

44.Affordable Housing – Density Bonus. If a density bonus was granted for the project, the regulatory agreement shall reflect the number of qualifying units set forth in Section 65915(f)(4) that are needed to support the bonus that was granted.

Prior to Demolition or Start of Construction:

45.Construction Meeting. The applicant shall request of the Zoning Officer an on-site meeting with City staff and key parties involved in the early phases of construction (e.g., applicant, general contractor, foundation subcontractors) to review these conditions and the construction schedule. The general contractor or applicant shall ensure that all subcontractors involved in subsequent phases of construction aware of the conditions of approval.

46.Transportation Construction Plan. The applicant and all persons associated with the project are hereby notified that a Transportation Construction Plan (TCP) may be required, particularly for the following activities:

A. Alterations, closures, or blockages to sidewalks, pedestrian paths or vehicle travel lanes (including bicycle lanes);
B. Storage of building materials, equipment, dumpsters, debris anywhere in the public ROW; C. Provision of exclusive contractor parking on-street; or D. Significant truck activity.

Please contact the Office of Transportation at (510) 981-7010, or 1947 Center Street, and ask to speak to a traffic engineer. In addition to other requirements of the Traffic Engineer, this plan shall include the locations of material and equipment storage, trailers, worker parking, a schedule of site operations that may block traffic, and provisions for traffic control. The TCP shall be stamped and signed by a registered engineer prior to submittal. The TCP shall be consistent with any other requirements of the construction phase. A current copy of this Plan shall be available at all times at the construction site for review by City Staff.

47.Construction/No Parking Permits. Contact the Permit Service Center (PSC) at 1947 Center Street or 981-7500 for details on obtaining Construction/No Parking Permits (and associated signs and accompanying dashboard permits). Please note that the Zoning Officer and/or Traffic Engineer may limit off-site parking of construction-related vehicles if necessary to protect the health, safety or convenience of the surrounding neighborhood.

During Construction:

48.Construction Hours. Construction activity shall be limited to between the hours of 7:00 AM and 6:00 PM on Monday through Friday, and between 9:00 AM and 4:00 PM on Saturday. No construction-related activity shall occur on Sunday or any Federal Holiday.

Page 31 of 132 ends
Page 35 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 20 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx

49.Construction Hours- Exceptions. It is recognized that certain construction activities, such as the placement of concrete, must be performed in a continuous manner and may require an extension of these work hours. Prior to initiating any activity that might require a longer period, the developer must notify the Zoning Officer and request an exception for a finite period of time. If the Zoning Officer approves the request, then two weeks prior to the expanded schedule, the developer shall notify businesses and residents within 500 feet of the project site describing the expanded construction hours. A copy of such notice and methodology for distributing the notice shall be provided in advance to the City for review and approval. The project shall not be allowed more than 15 extended working days.

50.Project Construction Website. The applicant shall establish a project construction website with the following information clearly accessible and updated monthly or more frequently as changes warrant.

A. Contact information (i.e. “hotline” phone number, and email address) for the project construction manager
B. Calendar and schedule of daily/weekly/monthly construction activities C. The final Conditions of Approval, Mitigation Monitoring and Reporting Program, Transportation Construction Plan, Construction Noise Reduction Program, and any other reports or programs related to construction noise, air quality, and traffic.

51.Public Works - Implement Bay Area Air Quality Management District (BAAQMD)- Recommended Measures during Construction. For all proposed projects, BAAQMD recommends implementing all the Basic Construction Mitigation Measures, listed below to meet the best management practices threshold for fugitive dust:

A. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day.

B. All haul trucks transporting soil, sand, or other loose material off-site shall be covered.

C. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.

D. All vehicle speeds on unpaved roads shall be limited to 15 mph.

E. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.

F. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]).

Clear signage shall be provided for construction workers at all access points.

G. All construction equipment shall be maintained and properly tuned in accordance with manufacturer specifications. All equipment shall be checked by a certified visible emissions evaluator.

Page 32 of 132 ends
Page 36 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 21 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
H. Post a publicly visible sign with the telephone number and person to contact at the lead agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations.

52.Air Quality - Diesel Particulate Matter Controls during Construction. All off-road construction equipment used for projects with construction lasting more than 2 months shall comply with one of the following measures:

A. The project applicant shall prepare a health risk assessment that demonstrates the project’s on-site emissions of diesel particulate matter during construction will not exceed health risk screening criteria after a screening-level health risk assessment is conducted in accordance with current guidance from BAAQMD and OEHHA. The health risk assessment shall be submitted to the Land Use Planning Division for review and approval prior to the issuance of building permits; or
B. All construction equipment shall be equipped with Tier 2 or higher engines and the most effective Verified Diesel Emission Control Strategies (VDECS) available for the engine type (Tier 4 engines automatically meet this requirement) as certified by the California Air Resources Board (CARB). The equipment shall be properly maintained and tuned in accordance with manufacturer specifications.

C. In addition, a Construction Emissions Minimization Plan (Emissions Plan) shall be prepared that includes the following:
i. An equipment inventory summarizing the type of off-road equipment required for each phase of construction, including the equipment manufacturer, equipment identification number, engine model year, engine certification (tier rating), horsepower, and engine serial number. For all VDECS, the equipment inventory shall also include the technology type, serial number, make, model, manufacturer, CARB verification number level, and installation date.
ii. A Certification Statement that the Contractor agrees to comply fully with the Emissions Plan and acknowledges that a significant violation of the Emissions Plan shall constitute a material breach of contract. The Emissions Plan shall be submitted to the Public Works Department for review and approval prior to the issuance of building permits.

53.Construction and Demolition Diversion. Divert debris according to your plan and collect required documentation. Get construction debris receipts from sorting facilities in order to verify diversion requirements. Upload recycling and disposal receipts if using Green Halo and submit online for City review and approval prior to final inspection. Alternatively, complete the Construction Waste Management Plan and present it, along with your construction debris receipts, to the Building Inspector by the final inspection to demonstrate diversion rate compliance. The Zoning Officer may request summary reports at more frequent intervals, as necessary to ensure compliance with this requirement.

Page 33 of 132 ends
Page 37 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 22 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx

54.Low-Carbon Concrete. The project shall maintain compliance with the Berkeley Green Code (BMC Chapter 19.37) including use of concrete mix design with a cement reduction of at least 25 percent. Documentation on concrete mix design shall be available at all times at the construction site for review by City Staff. (Project required to meet applicable code at time of building permit application, if different from above.)

55.Avoid Disturbance of Nesting Birds. Initial site disturbance activities, including vegetation and concrete removal, shall be prohibited during the general avian nesting season (February 1 to August 30), if feasible. If nesting season avoidance is not feasible, the applicant shall retain a qualified biologist to conduct a preconstruction nesting bird survey to determine the presence/absence, location, and activity status of any active nests on or adjacent to the project site. The extent of the survey buffer area surrounding the site shall be established by the qualified biologist to ensure that direct and indirect effects to nesting birds are avoided. To avoid the destruction of active nests and to protect the reproductive success of birds protected by the MBTA and CFGC, nesting bird surveys shall be performed not more than 14 days prior to scheduled vegetation and concrete removal. In the event that active nests are discovered, a suitable buffer (typically a minimum buffer of 50 feet for passerines and a minimum buffer of 250 feet for raptors) shall be established around such active nests and no construction shall be allowed inside the buffer areas until a qualified biologist has determined that the nest is no longer active (e.g., the nestlings have fledged and are no longer reliant on the nest). No ground-disturbing activities shall occur within this buffer until the qualified biologist has confirmed that breeding/nesting is completed and the young have fledged the nest. Nesting bird surveys are not required for construction activities occurring between August 31 and January 31.

56.Archaeological Resources (Ongoing throughout demolition, grading, and/or construction). Pursuant to CEQA Guidelines section 15064.5(f), “provisions for historical or unique archaeological resources accidentally discovered during construction” should be instituted. Therefore:

A. In the event that any prehistoric or historic subsurface cultural resources are discovered during ground disturbing activities, all work within 50 feet of the resources shall be halted and the project applicant and/or lead agency shall consult with a qualified archaeologist, historian or paleontologist to assess the significance of the find.

B. If any find is determined to be significant, representatives of the project proponent and/or lead agency and the qualified professional would meet to determine the appropriate avoidance measures or other appropriate measure, with the ultimate determination to be made by the City of Berkeley. All significant cultural materials recovered shall be subject to scientific analysis, professional museum curation, and/or a report prepared by the qualified professional according to current professional standards. There shall be no destructive or invasive testing on sacred items, burial goods and Native American human remains (invasive procedures include photography of cultural materials).

C. In considering any suggested measure proposed by the qualified professional, the project applicant shall determine whether avoidance is necessary or feasible in light of factors such as the uniqueness of the find, project design, costs, and other considerations.

Page 34 of 132 ends
Page 38 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 23 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
D. If avoidance is unnecessary or infeasible, other appropriate measures (e.g., data recovery) shall be instituted. Work may proceed on other parts of the project site while mitigation measures for cultural resources is carried out.

E. If significant materials are recovered, the qualified professional shall prepare a report on the findings for submittal to the Northwest Information Center.

57.Human Remains (Ongoing throughout demolition, grading, and/or construction). In the event that human skeletal remains are uncovered at the project site during ground-disturbing activities, all work shall immediately halt and the Alameda County Coroner shall be contacted to evaluate the remains, and following the procedures and protocols pursuant to Section 15064.5 (e)(1) of the CEQA Guidelines. If the County Coroner determines that the remains are Native American, the City shall contact the California Native American Heritage Commission (NAHC), pursuant to subdivision (c) of Section 7050.5 of the Health and Safety Code, and all excavation and site preparation activities shall cease within a 50-foot radius of the find until appropriate arrangements are made. If the agencies determine that avoidance is not feasible, then an alternative plan shall be prepared with specific steps and timeframe required to resume construction activities. Monitoring, data recovery, determination of significance and avoidance measures (if applicable) shall be completed expeditiously.

58.Paleontological Resources (Ongoing throughout demolition, grading, and/or construction). In the event of an unanticipated discovery of a paleontological resource during construction, excavations within 50 feet of the find shall be temporarily halted or diverted until the discovery is examined by a qualified paleontologist (per Society of Vertebrate Paleontology standards [SVP 1995,1996]). The qualified paleontologist shall document the discovery as needed, evaluate the potential resource, and assess the significance of the find. The paleontologist shall notify the appropriate agencies to determine procedures that would be followed before construction is allowed to resume at the location of the find. If the City determines that avoidance is not feasible, the paleontologist shall prepare an excavation plan for mitigating the effect of the project on the qualities that make the resource important, and such plan shall be implemented. The plan shall be submitted to the City for review and approval.

59.Halt Work/Unanticipated Discovery of Tribal Cultural Resources. In the event that cultural resources of Native American origin are identified during construction, all work within 50 feet of the discovery shall be redirected. The project applicant and project construction contractor shall notify the City Planning Department within 24 hours. The City will again contact any tribes who have requested consultation under AB 52, as well as contact a qualified archaeologist, to evaluate the resources and situation and provide recommendations. If it is determined that the resource is a tribal cultural resource and thus significant under CEQA, a mitigation plan shall be prepared and implemented in accordance with State guidelines and in consultation with Native American groups. If the resource cannot be avoided, additional measures to avoid or reduce impacts to the resource and to address tribal concerns may be required.

60.Stormwater Requirements. The applicant shall demonstrate compliance with the requirements of the City’s National Pollution Discharge Elimination System (NPDES) permit as described in BMC Section 17.20. The following conditions apply:

Page 35 of 132 ends
Page 39 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 24 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
A. The project plans shall identify and show site-specific Best Management Practices (BMPs) appropriate to activities conducted on-site to limit to the maximum extent practicable the discharge of pollutants to the City's storm drainage system, regardless of season or weather conditions.

B. Trash enclosures and/or recycling area(s) shall be covered; no other area shall drain onto this area. Drains in any wash or process area shall not discharge to the storm drain system; these drains should connect to the sanitary sewer. Applicant shall contact the City of Berkeley and EBMUD for specific connection and discharge requirements.

Discharges to the sanitary sewer are subject to the review, approval and conditions of the City of Berkeley and EBMUD.

C. Landscaping shall be designed with efficient irrigation to reduce runoff, promote surface infiltration and minimize the use of fertilizers and pesticides that contribute to stormwater pollution. Where feasible, landscaping should be designed and operated to treat runoff.

When and where possible, xeriscape and drought tolerant plants shall be incorporated into new development plans.

D. Design, location and maintenance requirements and schedules for any stormwater quality treatment structural controls shall be submitted to the Department of Public Works for review with respect to reasonable adequacy of the controls. The review does not relieve the property owner of the responsibility for complying with BMC Chapter 17.20 and future revisions to the City's overall stormwater quality ordinances. This review shall be shall be conducted prior to the issuance of a Building Permit.

E. All paved outdoor storage areas must be designed to reduce/limit the potential for runoff to contact pollutants.

F. All on-site storm drain inlets/catch basins must be cleaned at least once a year immediately prior to the rainy season. The property owner shall be responsible for all costs associated with proper operation and maintenance of all storm drainage facilities (pipelines, inlets, catch basins, outlets, etc.) associated with the project, unless the City accepts such facilities by Council action. Additional cleaning may be required by City of Berkeley Public Works Engineering Dept.

G. All private or public projects that create and/or replace 10,000 square feet or more of impervious surface must comply with Provision C.3 of the Alameda County NPDES permit and must incorporate stormwater controls to enhance water quality. Permit submittals shall include a Stormwater Requirement Checklist and detailed information showing how the proposed project will meet Provision C.3 stormwater requirements, including a) Site design measures to reduce impervious surfaces, promote infiltration, and reduce water quality impacts; b) Source Control Measures to keep pollutants out of stormwater runoff; c) Stormwater treatment measures that are hydraulically sized to remove pollutants from stormwater; d) an O & M (Operations and Maintenance) agreement for all stormwater treatment devices and installations; and e) Engineering calculations for all stormwater devices (both mechanical and biological). (Project required to meet applicable code at time of building permit application, if different from above.) H. All on-site storm drain inlets must be labeled “No Dumping – Drains to Bay” or equivalent using methods approved by the City.

Page 36 of 132 ends
Page 40 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 25 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
I. Most washing and/or steam cleaning must be done at an appropriately equipped facility that drains to the sanitary sewer. Any outdoor washing or pressure washing must be managed in such a way that there is no discharge or soaps or other pollutants to the storm drain. Sanitary connections are subject to the review, approval and conditions of the sanitary district with jurisdiction for receiving the discharge.

J. All loading areas must be designated to minimize “run-on” or runoff from the area.

Accumulated waste water that may contribute to the pollution of stormwater must be drained to the sanitary sewer or intercepted and pretreated prior to discharge to the storm drain system. The property owner shall ensure that BMPs are implemented to prevent potential stormwater pollution. These BMPs shall include, but are not limited to, a regular program of sweeping, litter control and spill cleanup.

K. Restaurants, where deemed appropriate, must be designed with a contained area for cleaning mats, equipment and containers. This contained wash area shall be covered or designed to prevent run-on or run-off from the area. The area shall not discharge to the storm drains; wash waters should drain to the sanitary sewer, or collected for ultimate disposal to the sanitary sewer. Employees shall be instructed and signs posted indicating that all washing activities shall be conducted in this area. Sanitary connections are subject to the review, approval and conditions of the waste water treatment plant receiving the discharge.

L. Sidewalks and parking lots shall be swept regularly to prevent the accumulation of litter and debris. If pressure washed, debris must be trapped and collected to prevent entry to the storm drain system. If any cleaning agent or degreaser is used, wash water shall not discharge to the storm drains; wash waters should be collected and discharged to the sanitary sewer. Discharges to the sanitary sewer are subject to the review, approval and conditions of the sanitary district with jurisdiction for receiving the discharge.

M. The applicant is responsible for ensuring that all contractors and sub-contractors are aware of and implement all stormwater quality control measures. Failure to comply with the approved construction BMPs shall result in the issuance of correction notices, citations, or a project stop work order.

61.Public Works. Subject to approval of the Public Works Department, the applicant shall repair any damage to public streets and/or sidewalks by construction vehicles traveling to or from the project site.

62.Public Works. All piles of debris, soil, sand, or other loose materials shall be covered at night and during rainy weather with plastic at least one-eighth millimeter thick and secured to the ground.

63.Public Works. The applicant shall ensure that all excavation accounts for surface and subsurface waters and underground streams so as not to adversely affect adjacent properties and rights-of-way.

64.Public Works. The project sponsor shall maintain sandbags or other devices around the site perimeter during the rainy season to prevent on-site soils from being washed off-site and into the storm drain system. The project sponsor shall comply with all City ordinances regarding construction and grading.

Page 37 of 132 ends
Page 41 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 26 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx

65.Public Works. Prior to any excavation, grading, clearing, or other activities involving soil disturbance during the rainy season the applicant shall obtain approval of an erosion prevention plan by the Building and Safety Division and the Public Works Department. The applicant shall be responsible for following these and any other measures required by the Building and Safety Division and the Public Works Department.

66.Public Works. The removal or obstruction of any fire hydrant shall require the submission of a plan to the City’s Public Works Department for the relocation of the fire hydrant during construction.

67.Public Works / Building and Safety. If underground utilities leading to adjacent properties are uncovered and/or broken, the contractor involved shall immediately notify the Public Works Department and the Building & Safety Division, and carry out any necessary corrective action to their satisfaction.

Prior to Final Inspection or Issuance of Occupancy Permit:

68.Compliance with Conditions and Environmental Mitigations. The project shall conform to the plans and statements in the Use Permit. The developer is responsible for providing sufficient evidence to demonstrate compliance with the requirements throughout the implementation of this Use Permit. Occupancy is subject to verification of compliance to the Mitigation Monitoring and Reporting Program.

69.All landscape, site and architectural improvements shall be completed per the attached approved drawings dated December 8, 2023.

70.Number of Below Market Rate Units.

Should the Applicant elect to provide BMR units prior
to receiving a building permit for the Project, they are entitled to eliminate or receive a proportional reduction in the AHMF consistent with BMC Section 22.20.065. The BMR Units shall be designated in the Regulatory Agreement; comply with the City’s BMR administrative guidelines; shall be reasonably dispersed throughout the project; be of the same size and contain, on average, the same number of bedrooms as the non-BMR units in the project; and be comparable with the design or use of non-BMR units in terms of appearance, materials and finish quality. The designation of BMR Units shall conform to the addresses assigned to the building by the City. Any additional BMR units the applicant may choose to provide must also conform with these conditions.

71.Transportation Demand Management. Prior to issuance of a Certificate of Occupancy, the property owner shall facilitate a site inspection by Land Use Division staff to confirm that the physical improvements required in BMC Section 23.322.060 have been installed. A Parking and Transportation Demand Management (PTDM) compliance report documenting that the programmatic measures required in BMC Section 23.322.060 are implemented shall be submitted to the Land Use Division prior to occupancy, and on an annual basis thereafter, which demonstrates that the project is compliant with the applicable requirements in this section:

Page 38 of 132 ends
Page 42 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 27 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx
A. For new structures or additions over 20,000 square feet, the property owner shall provide transportation benefits at no cost to every employee, residential unit, and/or group living accommodation resident, one pass for unlimited local bus transit service; or (subject to the review and approval of the Zoning Officer in consultation with the Transportation Division) a functionally equivalent transit benefit in an amount at least equal to the price of a non-discounted adult monthly local bus pass. A notice describing these transportation benefits shall be posted in a location or locations visible to all employee and residents.

72.Green Building Certification. The applicant shall submit updated documentation demonstrating that the building will attain LEED Gold or higher, or attain a building performance equivalent to this rating that has been approved by the Zoning Officer for this project. Documentation expected at this stage includes proof of submission of the final application materials and payment of the certification fee. If this submission has not yet occurred, a detailed explanation and timeline indicating when it will it happen must be submitted to the Zoning Officer for review and approval. Once awarded by the organization administering the green building certification system, the applicant shall forward a copy of the certification award to the Zoning Officer.

At All Times:

73.Compliance with Approved Plan. The project shall conform to the plans and statements in the Use Permit.

74.Exterior Lighting. All exterior lighting shall be energy efficient where feasible; and shielded and directed downward and away from property lines to prevent excessive glare beyond the subject property.

75.Rooftop Projections. No additional rooftop or elevator equipment shall be added to exceed the approved maximum roof height without submission of an application for a Use Permit Modification, subject to Board review and approval.

76.Design Review. Signage and any other exterior modifications, including but not limited to landscaping and lighting, shall be subject to Design Review approval.

77.Drainage Patterns. The applicant shall establish and maintain drainage patterns that do not adversely affect adjacent properties and rights-of-way. Drainage plans shall be submitted for approval of the Building & Safety Division and Public Works Department, if required.

78.Electrical Meter. Only one electrical meter fixture may be installed per dwelling unit.

79.Loading. All loading/unloading activities associated with deliveries to all uses shall be restricted to the hours of 7:00 a.m. to 10:00 p.m. daily.

80.Residential Permit Parking. No Residential Permit Parking (RPP) permits shall be issued to project residents, nor shall commercial placards be issued to non-residential occupants and/or users of the site. The Finance Department, Customer Service Center shall add these addresses to the list of addresses ineligible for RPP permits. The property owner shall notify all tenants of rental units, and/or buyers of condominium units, of this restriction in leases and/or contracts.

81.Required Bike Parking. Secure and on-site bike parking for a minimum of 72 bicycles shall be provided for the life of the building.

Page 39 of 132 ends
Page 43 ends

2274 SHATTUCK AVENUE - USE PERMIT #ZP2023-0079 FINDINGS & CONDITIONS April 22, 2025 Page 28 of 28
File: G:\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12- 12_ATT1_ZAB_FC-FINAL_2274 Shattuck.docx

82.Nonresidential Electric Vehicle (EV) Charging. Required Level 2 charging stations and DC Fast Charge stations, as specified by the Berkeley Green Code (BMC Chapter 19.37) shall be maintained in good working condition and made available for building occupant and/or visitor use. (Project required to meet applicable code at time of building permit application, if different from above.)

83.Tenant Notification. The developer shall provide tenant notification, via a lease rider or deed covenant, that each dwelling unit is located in a mixed-use area that includes commercial, food service, and entertainment uses, and that each occupant shall not seek to impede their lawful operation.

84.Guaranteed Ride Home. If qualifying for participation in the Alameda County Guaranteed Ride Home program (or successor program), shall participate in the “Guarantee Ride Home” program to reduce employee single occupant vehicle trips by providing alternate means of leaving work in an emergency. Enrollment shall be encouraged by providing Guarantee Ride Home information to all employees. An affidavit/statement indicating number of participating employees shall be provided annually to the Transportation Division Manager

85.Transit Subsidy Condition. If 10 or more employees, the business operator shall reimburse employees the maximum non-taxable cost of commuting to and from work on public transportation (e.g., monthly passes) if they so commute, and a notice informing employees of the availability of such subsidy shall be permanently displayed in the employee area as per BMC Chapter 9.88.

Page 40 of 132 ends
Page 44 ends

1947 Center Street, 2nd Floor, Berkeley, CA 94704 Tel: 510.981.7410 TDD: 510.981.6903 Fax: 510.981.7420 E-mail: [email protected]
Planning and Development
Land Use Planning Division
October 4, 2024
Robin Baral
Senior Counsel
Hanson Bridgett LLP
425 Market Street, 26th Floor
San Francisco, CA 94105
RE: Response t
o AB 1633 Notice for Use Permit #ZP2023-0079 – 2274 Shattuck Avenue Dear Mr. Baral,
The City of Berkeley has received the AB 1633 Noti
ce of CEQA Exemption prepared by Hanson
Bridgett, LLC, dated March 4, 2024, with the attached technical reports (Traffic Impact Analysis, Historic Resource Evaluation, Project Impacts Analysis, and Air Quality, Noise, and Water Quality reports). With this letter, staff is fulfilling its obligation to provide a determination on the AB 1633 Notice within 180 days, plus the extension of time in the Tolling Agreement executed on September 3, 2024.

Staff has determined that this project meets the criteria for a Categorical exemption pursuant to CEQA Guidelines, Section 15332, “In-Fill Development Projects” (Class 32).

Next Steps

1. ZAB Decision. Pursuant to Government Code Section 65950, the project shall be approved or disapproved within 60 days of staff’s determination that the project is exempt from CEQA (December 3, 2024). However, the Berkeley Municipal Code requires the permit application to undergo Preliminary Design Review (DRCP2023-0008) at a public meeting before the Design Review Committee (DRC) prior to a decision on the use permit (ZP2023-0079) by the Zoning Adjustments Board (ZAB). The earliest that the design review application can be scheduled for DRC review is November 21, 2024.

Following the DRC review, the earliest that the permit application can be scheduled for a decision hearing before the ZAB is December 14, 2024.

Pursuant to Government Code Section 65957, the project applicant and lead agency may extend the time limit once, up to 90 days, by mutual written agreement. To meet the time limits afforded by Section 65950, staff is recommending a time extension agreement to allow the DRC meeting to occur on November 21 and ZAB hearing to occur on December 14.

Please provide written confirmation that you agree to an extension of the time limit set forth in Government Code section 65950.

Sent via Email:

[email protected]
Attachment 1, Exhibit A, Exhibit 1

Page 41 of 132 ends
Page 45 ends
Page 2 of 2 ends

2. Notice of Exemption. The City will be filing the Notice of Exemption (NOE) for projects that go to the ZAB or City Council. Filing the NOE starts a 35-day statute of limitations period on legal challenges to the agency’s decision that a project is exempt from CEQA.

If the NOE is not filed, a 180- day statute of limitations applies. The NOE needs to be filed with the State Clearinghouse and with the County Clerk’s office. The City will post with the State Clearinghouse, but the posting with the County Clerk’s office can be done by either the City or the applicant. If the City completes the posting, there is a fee of $920. Otherwise, the applicant can file with the County and provide the $50 filing fee directly to the County. The NOE is filed after the use permit becomes effective.

Please complete the attached form to state your preference and return it to me via email.

Note that additional information may be required to correct, clarify, or amplify the materials submitted in the application, to prepare the project for a ZAB decision hearing. Please provide the information requested by staff in a timely manner in order to maintain the discussed project schedule.

Please feel free to contact me with any questions regarding this letter or your application.

Sincerely,

Sharon Gong
Senior Planner
(510) 981-7429
[email protected]

Cc:

JP Walsh, Panoramic Interests
Patrick Kennedy, Panoramic Interests
Farimah Brown, City Attorney, City of Berkeley
Sara Stephens, Deputy City Attorney, City of Berkeley
Jordan Klein, Director of Department of Planning and Development, City of Berkeley Anne Hersch, Land Use Planning Manager, City of Berkeley Claudia Garcia, Principal Planner, City of Berkeley

Attachment:

Notice of Exemption Filing Preference Form

Page 42 of 132 ends
Page 46 ends

Internal

1947 Center St., 2nd Floor • Berkeley, CA 94704 • (510) 981-7400 • TDD: (510) 981-7474 • [email protected]

To: Applicant
From: City of Berkeley Planning & Development
Project Address/Permit # (ZP): ___________________________________________________________ Subject: Private Projects – Filing Notice of Exemption (NOE) form with the Alameda County Clerk-Recorder

Following decision-maker approval of a project exempt from the provisions of the California Environmental Quality Act (CEQA), a NOE may be filed with the Alameda County Clerk-Recorder. It is strongly recommended that the NOE be filed in a timely manner. The filing of a NOE starts a 35-day statute of limitations period on legal challenges to the agency’s decision that the project is exempt from the provisions of CEQA. If the NOE is not filed a 180 -day statute of limitations will apply, refer to CEQA Guidelines Section 15062(d). Please note that recent legislation requires the City to file the NOE with the State Clearinghouse in the Office of Planning and Research.

Please review the attached NOE and indicate how you would like to proceed with filing by selecting one of the options below:
Berkeley Planning & Development to file the NOE: Within 30-days of deeming the project complete, the Applicant will be invoiced for the NOE filing fee, refer to the current fee schedule linked here. Please note that Berkeley Planning staff will schedule the public hearing once all outstanding fees are paid. Once the project receives final approval and after the 15-day appeal period expires, Berkeley Planning staff will file the NOE with the Alameda County Clerk-Recorder and the State Clearinghouse. Applicant to file the NOE: Applicant shall submit a copy to the Alameda County Clerk-Recorder in accordance with CEQA Guidelines Section 15062 after the project receives final approval and the 14-day appeal period expires. The Office of the County Clerk-Recorder is located at 1106 Madison Street, Oakland, CA 94607. The Clerk will stamp the NOE, return the original set, and post the NOE for a period of 30 days. Once recorded, the applicant shall provide a stamped copy to the Berkeley Planning staff person assigned to the project. Refer to Alameda County Clerk-Recorder’s website linked here for more information on hours of operation, fees, and payment methods.

Applicant Name (please print):

Applicant Signature:

Date:

Please note that categorical exemptions are not subject to the California Department of Fish and Wildlife environmental document filing fee and do not require a no effect determination (Cal. Code Regs., tit. 14, §§ 15260- 15333; Fish & Game Code §711.4, subd. (d)(1)).

Page 43 of 132 ends
Page 47 ends

PROJECT SITE KITTREDGE ST.

BANCROFT WAY
SHATTUCK AVE.

MILVIA ST.

PROJECT DESCRIPTION
N.T.S.

N

PROJECT DIRECTORY VICINITY MAP

ZONING CODE SUMMARY
(BASED ON THE BERKELEY MUNICIPAL ZONING CODE)
ZONING: C-DMU
SEE SHEET A0.1 FOR COMPLETE ZONING DATA
OWNER/APPLICANT:

JP Walsh, Director

PANORAMIC INTERESTS
2539 Telegraph Ave, Suite 101
415.701.7000
Berkeley, CA 94704
panoramic.com
PROJECT ADDRESS: 2274 Shattuck Ave.

Berkeley, CA 94704 (APN: 057 202800300)
SCOPE OF WORK:

PARTIAL REMOVAL OF THE EXISTING COMMERCIAL STRUCTURES TO CONSTRUCT A NEW 17-STORY MIXED-USE BUILDING WITH 227 DWELLING UNITS, GROUND LEVEL LOBBIES, COMMERCIAL SPACE, AND PARKING WITH STATE OF CALIFORNIA DENSITY BONUS.

GENERAL

INFORMATION
A0.0

DRAWING LIST

ARCHITECTURAL
SHEET NO. & TITLE
A0.0GENERAL INFORMATION
FLOOR PLANSA2.1
A2.2
A3.1BUILDING ELEVATIONS
A3.2BUILDING ELEVATIONS
A3.3 A0.1

FLOOR PLANS

BUILDING ELEVATIONS
A3.4BUILDING ELEVATIONS
ARCHITECT:

David Trachtenberg, Principal

TRACHTENBERG ARCHITECTS
2421 Fourth Street
Berkeley, CA 94710
510.649.1414
www.TrachtenbergArch.com
A2.3FLOOR PLANS
A2.0AEXISTING SITE PLAN

ZONING DATA
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
A0.3ADENSITY BONUS DIAGRAMS
A1.0SURVEY
A1.1SURVEY
A3.5STREET STRIP ELEVATION
A3.6STREET STRIP ELEVATION
A3.9RENDERED PERSPECTIVE
A3.10RENDERED PERSPECTIVE

MATBUILDING MATERIALS
A0.5SITE CONTEXT PHOTOS
A0.6VICINITY MAP
A2.0BSITE PLAN
A3.0BUILDING SECTIONS
A3.11RENDERED PERSPECTIVE
A3.12RENDERED PERSPECTIVE
A3.13RENDERED PERSPECTIVE
A3.14RENDERED PERSPECTIVE
A3.15RENDERED PERSPECTIVE
A3.7PHOTO MATCH VIEWS
A3.8PHOTO MATCH VIEWS

LANDSCAPE
LANDSCAPE ARCHITECT:

Jesse Markman, Principal
JETT LANDSCAPE ARCHITECTURE + DESIGN
2 Theatre Square, Suite 218
Orinda CA 94563
www.jett.land
L1.01LANDSCAPE PLAN - GROUND FLOOR
L1.02LANDSCAPE ROOF PLAN
L2.01
L3.01PLANT IMAGES, NOTES AND CALCULATIONS A0.4ASHADOW STUDIES A0.4BSHADOW STUDIES
A0.4CSHADOW STUDIES
A0.3BDENSITY BONUS DIAGRAMSPRECEDENT IMAGES
L4.01PRELIMINARY PLANTING PLAN - GROUND
L4.02PRELIMINARY PLANTING PLAN - ROOF
L5.01PRELIMINARY IRRIGATION PLAN - GROUND
L5.02PRELIMINARY IRRIGATION PLAN - ROOF
A4.0HISTORIC FACADE RESTORATION
Attachment 1, Exhibit B

Page 44 of 132 ends
Page 48 ends

3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
FD
43'-10"2'-0"
9'-2"11'-1"
TRASH
908 SF
5'-6" 31'-8" 2'-9"
12'-6"82'-7"29'-0"
1'-0"
23'-1"33'-3"35'-5"
2'-11"31'-3"
30'-8"
45'-8" 35'-6"
18'-2"
2'-8"
2'-0"

ROOF DECK

COMMON OPEN SPACE
5,804 SF
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
FD
65'-0"
65'-0"
96 gal
96 gal
96 gal
16'-4" 27'-5"
12'-0"
1'-3"
11'-7"
1'-0"
10'-3" 27'-5" 21'-1" 22'-11"
22'-5"13'-0"
12'-9"

PRIVATE PATIO

OPEN SPACE
80 SF COUNTED

PRIVATE PATIO

OPEN SPACE
80 SF COUNTED

PRIVATE PATIO

OPEN SPACE
80 SF COUNTED
36'-0"

COMMON OPEN SPACE
317 SF

COMMON OPEN SPACE
1,340 SF
13'-6"
4'-3"
55'-11"

PRIVATELY OWNED

PUBLIC OPEN SPACE
17 SF
BIKES
(72)

ARCHITECTURAL

ROOFTOP ELEMENTS
1,891 SF SOLID AREAS OF

ARCHITECTURAL

FRAME NOT OPEN TO

SKY ARE INCLUDED IN

CALCULATION

ZONING DATA
A0.1

REFUSE AND RECYCLING

PROJECT SITE
2274 SHATTUCK
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
ROOF

OPEN SPACE DIAGRAM

GROUND LEVEL BIKE PARKING

ROOFTOP ELEMENTS

ZONING MAP

ZONING COMPLIANCEZONING COMPLIANCE

Page 45 of 132 ends
Page 49 ends

ROOF DECK
10'-3"10'-3"10'-3"10'-3"10'-3"13'-6"
L8
L7
L6
L5
L4
L3
L2
GROUND
75'-0"
10'-3"
PLPL
65'-0"
65'-0"

ROOF DECK
14,043 SF
1 24
23 22
21 20
19 18 17 16
15 14
13 12
11 10 9
8 7
5432
65'-0"
65'-0"
0"

SIDE YARD

SETBACK
5'-0"

SIDE YARD

SETBACK
5'-0"

SIDE YARD

SETBACK
5'-0"

SIDE YARD

SETBACK
5'-0"

SIDE YARD

SETBACK
5'-0"

SIDE YARD

SETBACK

ALLOWABLE USE PERMIT MODIFICATIONS

23.204.130.E.3(B) FOR MODIFIED SETBACKS
6 1 6
54 65'-0"
65'-0"
8 3
2 7

TRASHLEASING
MEP
2,702 SF
MAIL STOR.

LOBBY
LOBBY

LAUNDRY
BIKES - 1,161 SF
CAFE
865 SF

PRIVATELY OWNED

PUBLIC OPEN
SPACE
150 SF

DENSITY BONUS

DIAGRAMS -

BASE PROJECT
A0.3A

BASE PROJECT
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

PLAN AT GROUND
(0' TO 20')
PLAN AT LEVELS 2-7
(21' TO 75')

PLAN AT ROOF

SECTION

Page 46 of 132 ends
Page 50 ends

3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
FD
65'-0"
65'-0"
96 gal
96 gal
96 gal CAFE
865 SFLOBBY
1 32
MEP
3,959 SF

PARKING
1,327 SF

PRIVATELY OWNED

PUBLIC OPEN SPACE
17 SF
96 gal
96 gal
65'-0"
65'-0"
5'-0"

SIDE YARD

SETBACK
5'-0"

SIDE YARD

SETBACK
5'-0"

SIDE YARD

SETBACK
5'-0"

SIDE YARD

SETBACK
5'-0"

SIDE YARD

SETBACK
5'-0"

SIDE YARD

SETBACK
6 5
4 321
7 8
9 10
11 12
13 14
65'-0"

ROOF DECK

ROOF DECK
PL
PL

LOBBY/LEASING ENTRY/CAFEMEP CIRCULATION
LEVEL 2
AVE. GRADE
18'-0" 10'-3" 10'-3" 10'-3"10'-3" 10'-3"10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
LEVEL 11
LEVEL 12
LEVEL 13
LEVEL 14
LEVEL 15
LEVEL 17
11'-3"10'-3" LEVEL 16
183'-0"
T.O. ROOF
T.O. GLASS RAILING
5'-0" 10'-0"
ELEV. OVERRUN

LOWEST GRADE
96 gal
96 gal
65'-0"
65'-0"
15'-0"

FRONT YARD

SETBACK
15'-0"
FRONT

SETBACK
15'-0"

SIDE YARD

SETBACK
15'-0"

SIDE YARD

SETBACK
15'-0"

SIDE YARD

SETBACK
15'-0"

SIDE YARD

SETBACK
15'-0"

SIDE YARD

SETBACK
15'-0"

SIDE YARD

SETBACK
5'-0"

SIDE YARD

SETBACK
5'-0"

SIDE YARD

SETBACK
96 gal
96 gal
65'-0"
65'-0"
15'-0"
FRONT

SETBACK
15'-0"

FRONT YARD

SETBACK
15'-0"

SIDE YARD

SETBACK
15'-0"

SIDE YARD

SETBACK
15'-0"

SIDE YARD

SETBACK
15'-0"

SIDE YARD

SETBACK
15'-0"

SIDE YARD

SETBACK
15'-0"

SIDE YARD

SETBACK

DENSITY BONUS

DIAGRAMS -

PROPOSED PROJECT
A0.3B

PLAN AT GROUND

PROPOSED DENSITY BONUS PROJECT
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
PLAN AT LEVELS 2-7
(21' TO 75')

PLAN AT ROOF

SECTION
PLAN AT LEVELS 8-11
(76' TO 120')
PLAN AT LEVELS 12-17
(>120')
SEE A0.1 FOR PROPOSED PROJECT COMPLIANCE

Page 47 of 132 ends
Page 51 ends

2231

SHATTUCK
2020

KITTREDGE ST
KITTREDGE ST.

SHATTUCK AVE.

MILVIA ST

BANCROFT WAY

HAROLD WAY
2231

SHATTUCK

NEW SHADOWS CAST ONEXISTING RESIDENTIAL
KITTREDGE ST.

SHATTUCK AVE.

MILVIA ST

BANCROFT WAY

HAROLD WAY
5-STORY

MULTIFAMILY
3-STORY
MULTI-FAM.
3-STORY
RES.
4-STORY

MULTI-FAMILY
2020

KITTREDGE ST
6-STORY

MULTIFAMILY
3-STORY

MULTI-FAMILY
3-STORY

MULTI-FAMILY

NEW SHADOWS CAST ONEXISTING RESIDENTIAL
KITTREDGE ST.

SHATTUCK AVE.

MILVIA ST

BANCROFT WAY

HAROLD WAY

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

PROPOSED BUILDING

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

PROPOSED BUILDING

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

PROPOSED BUILDING
N

SHADOW STUDIES
DECEMBER 21ST
A0.4A

WINTER SOLSTICE
DEC 21ST:
2-HRS BEFORE SUNSET (PM)

WINTER SOLSTICE
DEC 21ST:

NOON

WINTER SOLSTICE
DEC 21ST:
2-HRS AFTER SUNRISE (AM)
3SHADOW STUDY - NOON
1:180 @ 11X17 1:90 @ 24X36
5SHADOW STUDY - PM
1:180 @ 11X17 1:90 @ 24X36
1SHADOW STUDY - AM
1:180 @ 11X17 1:90 @ 24X36
2SHADOW STUDY AXONOMETRIC - AM
N.T.S.
4SHADOW STUDY AXONOMETRIC - NOON
NT.S.
6SHADOW STUDY AXONOMETRIC - PM
N.T.S.

N
N
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 48 of 132 ends
Page 52 ends

2295

SHATTUCK AVE
2010

BANCROFT WY
2020

KITTREDGE ST
KITTREDGE ST.

SHATTUCK AVE.

MILVIA ST

BANCROFT WAY

HAROLD WAY
KITTREDGE ST.

SHATTUCK AVE.

MILVIA ST

BANCROFT WAY

HAROLD WAY
2319

SHATTUCK AVE
2295

SHATTUCK AVE

NEW SHADOWS CAST ONEXISTING RESIDENTIAL
2010

BANCROFT WY
KITTREDGE ST.

SHATTUCK AVE.

MILVIA ST

BANCROFT WAY

HAROLD WAY
2020

KITTREDGE ST

NEW SHADOWS CAST ONEXISTING RESIDENTIAL

NEW SHADOWS CAST ONEXISTING RESIDENTIAL

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

PROPOSED BUILDING

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

PROPOSED BUILDING

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

PROPOSED BUILDING
N

SHADOW STUDIES
JUNE 21ST
A0.4B

SUMMER SOLSTICE
JUN 21ST:
2-HRS BEFORE SUNSET (PM)

SUMMER SOLSTICE
JUN 21ST:

NOON

SUMMER SOLSTICE
JUN 21ST:
2-HRS AFTER SUNRISE (AM)
3SHADOW STUDY - NOON
1:160 @ 11X17 1:80 @ 24X36
5SHADOW STUDY - PM
1:160 @ 11X17 1:80 @ 24X36
1SHADOW STUDY - AM
1:160 @ 11X17 1:80 @ 24X36
2SHADOW STUDY AXONOMETRIC - AM
N.T.S.
4SHADOW STUDY AXONOMETRIC - NOON
NT.S.
6SHADOW STUDY AXONOMETRIC - PM
N.T.S.

N
N
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 49 of 132 ends
Page 53 ends

2319

SHATTUCK AVE
2295

SHATTUCK AVE
2010

BANCROFT WY
2020

KITTREDGE ST
KITTREDGE ST.

SHATTUCK AVE.

MILVIA ST

BANCROFT WAY
KITTREDGE ST.

SHATTUCK AVE.

MILVIA ST

BANCROFT WAY

HAROLD WAY
2319

SHATTUCK AVE
2295

SHATTUCK AVE

NEW SHADOWS CAST ONEXISTING RESIDENTIAL
KITTREDGE ST.

SHATTUCK AVE.

MILVIA ST

BANCROFT WAY

HAROLD WAY
2010

BANCROFT WY
2020

KITTREDGE ST

NEW SHADOWS CAST ONEXISTING RESIDENTIAL

NEW SHADOWS CAST ONEXISTING RESIDENTIAL

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

PROPOSED BUILDING

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

PROPOSED BUILDING

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

PROPOSED BUILDING
N

SHADOW STUDIES
MAY 9TH
A0.4C

CURRENT
MAY 9TH:
2-HRS BEFORE SUNSET (PM)

CURRENT
MAY 9TH:

NOON

CURRENT
MAY 9TH:
2-HRS AFTER SUNRISE (AM)
3SHADOW STUDY - NOON
1:160 @ 11X17 1:80 @ 24X36
5SHADOW STUDY - PM
1:160 @ 11X17 1:80 @ 24X36
1SHADOW STUDY - AM
1:160 @ 11X17 1:80 @ 24X36
2SHADOW STUDY AXONOMETRIC - AM
N.T.S.
4SHADOW STUDY AXONOMETRIC - NOON
NT.S.
6SHADOW STUDY AXONOMETRIC - PM
N.T.S.

N
N
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 50 of 132 ends
Page 54 ends

1 -
GOOGLE EARTH BIRD'S EYE CONTEXT VIEW 3
-

VIEW FROM BANCROFT LOOKING WEST
4 -
VIEW FROM SHATTUCK LOOKING SOUTH2
-

VIEW FROM SHATTUCK LOOKING NORTH
2274 SHATTUCK

PROJECT SITE

PROJECT SITE
2274 SHATTUCK AVE.

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
2274 SHATTUCK

PROJECT SITE

SITE CONTEXT
PHOTOS
A0.5
SHATTUCK AVE.

BANCROFT WAY
KITTREDGE ST.

DURANT AVE.
2274 SHATTUCK

PROJECT SITE

BERKELEY PUBLIC

LIBRARY
(CIVIC)
2110 KITTREDGE
(3-STORY MIXED-USE)
2274 - 2283 SHATTUCK
(1-2 STORY COMMERICAL)
2105 BANCROFT
(4-STORY

COMMERICAL)
2041 BANCROFT
(3-STORY

COMMERCIAL)
2272 SHATTUCK
(2-STORY

COMMERCIAL)
2105 BANCROFT
(4-STORY

COMMERICAL)
2041 BANCROFT
(3-STORY

COMMERCIAL)

BERKELEY PUBLIC

LIBRARY
(CIVIC)
2272 SHATTUCK
(2-STORY

COMMERCIAL)
2110 KITTREDGE
(3-STORY MIXED-USE)
2274 - 2283 SHATTUCK
(1-2 STORY COMMERICAL)
2041 BANCROFT
(3-STORY

COMMERCIAL)

BERKELEY PUBLIC

LIBRARY
(CIVIC)
2272 SHATTUCK
(2-STORY

COMMERCIAL)

PROJECT SITE FRONTING
BANCROFT 2322 SHATTUCK
(4-STORY MIXED USE)

Page 51 of 132 ends
Page 55 ends

2276
2274
2090
2200-2260
2219
2225
2231
2231
2115
2222
2018
2210
2222
2110
2124
2138
2020
2090
2070
2110
2271
2277
2281
2283
2105
2105
2274
2276
2031
2223
2239
2000
2235
2001PROJECT SITE
2274 SHATTUCK
6-STORY

COMMERCIAL
3-STORY

MULTI-FAMILY
2-STORY

COMMERCIAL
2-STORY

COMMERCIAL
5-STORY

COMMERCIAL
2-STORY

COMMERCIAL
3-STORY

COMMERCIAL
2070
3-STORY

COMMERCIAL
1-STORY
COMMERCIAL 2-STORY

COMMERCIAL
2000
2018

KITTREDGE ST

BANCROFT WAY

SHATTUCK AVE

HAROLD WAY

MILVIA ST
2200-2260
2070
2239
2010
2001
2000
2000
2000
2000
2000
2025
2028
2030
2300
2300
2301
2301
2323
2327
2333
2333
4-STORY

COMMERCIAL
2-STORY

COMMERCIAL
5-STORY

MULTIFAMILY
2-STORY

COMMERCIAL
1-STORY
COMM
3-STORY

COMMERCIAL
3-STORY
MULTI-FAM.3-STORY
RES.
4-STORY

MULTI-FAMILY

COMMERCIAL

PARKING
3-STORY

COMMERCIAL
3-STORY

COMMERCIAL
3-STORY

COMMERCIAL
3-STORY

COMMERCIAL
5-STORY

MULTI-FAMILY
1-STORY
COMM

COMMERCIAL

PARKING
3-STORY

COMMERCIAL
2-STORY

COMMERCIAL
4-STORY

COMMERCIAL
3-STORY

COMMERCIAL
2-STORY

COMMERCIAL
4-STORY

COMMERCIAL
1-STORY
COMM
2-STORY
COMM
3-STORY

MULTI-FAMILY
2-STORY
COMM
2-STORY
COMM
2-STORY
COMM

VICINITY MAP
A0.6
1 -

VICINITY MAP
NTS
N
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 52 of 132 ends
Page 56 ends

SURVEY
A1.0
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 53 of 132 ends
Page 57 ends

SURVEY
A1.1
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 54 of 132 ends
Page 58 ends

SHATTUCK AVE.

BANCROFT WAY

MORSE BLOCK
2276 SHATTUCK

EXISTING COMMERCIAL USE
(HISTORIC BUILDING)

EXISTING BUILDINGS TO BE

DEMOLISHED, SHOWN HATCHED
2274 SHATTUCK

EXISTING

COMMERCIAL USE
2270 SHATTUCK

EXISTING

COMMERCIAL USE
KITTREDGE ST.
2274 SHATTUCK

EXISTING
COMMERCIAL USE*
2031 BANCROFT

EXISTING

COMMERCIAL USE
2022 KITTREDGE

EXISTING

RESIDENTIAL USE
2022 KITTREDGE

EXISTING

RESIDENTIAL USE
* NOTE, THERE ARE NO EXISTING

RESIDENTIAL UNITS ONSITE, SO NO

DWELLING UNITS WILL BE DEMOLISHED
AS PART OF THIS PROJECT.

FOOTPRINT OF (N) BUILDING SHOWN W/ BLUE DASH

EXISTING BUILDING TO
REMAIN
104'-6" 1'-3"
134'-8" 34'-0"
117'-10"
31'-9"
100'-0"
113'-2"
36'-0"
100'-0"
2'-6"

BERKELEY PUBLIC LIBRARY
2090 KITTREDGE

EXISTING CIVIC USE
(HISTORIC BUILDING)

EXISTING

SITE & DEMO
PLAN
A2.0A
1 A2.0

EXISTING SITE & DEMO PLAN
1/32"=1'-0" @ 11x17 1/16"=1'-0" @ 24x36 80 4 16 32
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
N

Page 55 of 132 ends
Page 59 ends

SHATTUCK AVE.

BANCROFT WAY
2270 SHATTUCK

EXISTING

COMMERCIAL USE

BERKELEY PUBLIC LIBRARY
2090 KITTREDGE

EXISTING CIVIC USE
(HISTORIC BUILDING)
KITTREDGE ST.
2031 BANCROFT

EXISTING

COMMERCIAL USE
2022 KITTREDGE

EXISTING

RESIDENTIAL USE
2022 KITTREDGE

EXISTING

RESIDENTIAL USE
104'-6"
134'-8" 34'-0"
117'-10"
31'-9"
100'-0"
113'-2"
36'-0"
100'-0"
2'-6"

SOLAR AREA BELOW
MECH.

EQUIPMENT
BELOW

ROOF DECK
BELOW

UNOCCUPIED
ROOF
UN-

OCCUPIED
ROOF
ELEV.

OVERRUN

ROOF DECK
BELOW

ROOF DECK
BELOW

UNOCCUPIED ROOF OF

EXISTING BUILDING BELOW
9'-0"
10'-0"
10'-3" 23'-1"
11'-7"
11'-4"
20'-0" NEW CURB CUT

MORSE BLOCK
2276 SHATTUCK

EXISTING COMMERCIAL USE
(HISTORIC BUILDING)

SITE PLAN
A2.0B
1 A2.0

SITE PLAN
1/32"=1'-0" @ 11x17 1/16"=1'-0" @ 24x36 80 4 16 32
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
N

Page 56 of 132 ends
Page 60 ends

SHOP AND

MAINTENANCE
2276 SHATTUCK

EXISTING

COMMERCIAL USE
2270 SHATTUCK

EXISTING COMMERCIAL USE
2031 BANCROFT

EXISTING

COMMERCIAL USE
2270 SHATTUCK

EXISTING COMMERCIAL USE
SHATTUCK AVE.
8'-0"
8' MIN.

MDF/MPOE

SHOP AND

MAINTENANCE
BIKES (72)

EXIT PASSAGEWAY

SEE LANDSCAPE

DRAWINGS

SEE LANDSCAPE DRAWINGS
FIRE

COMMAND
200 SFLOBBY / STUDY

BANCROFT WAY
3 CY
BIN
3 CY
BIN
TRASH
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal

LAUNDRY
MECH
MAIN

ELECTRICAL
ROOM

GENERATOR

DOMESTIC
PUMP

BACKFLOW
& CHECK
VALVE

FIRE WATER STORAGE

FIRE PUMPFIRE PUMP

SWITCHGEAR

LOADING ZONE
STO.

MAIL
MEP
157'-1" 11'-7"
10'-3"84'-6"23'-1"
155'-1" 11'-4"
1'-0"
10'-0"82'-6"12'-0"
4-BR
1,018 SF
2-BR
540 SF
4-BR
1,047 SF

LOBBYCAFE
865 SF W/C
TRASH
/ STO.

W/C
OFFICE
ENTRY
STO.

BOH
20'-0" NEW CURB CUT

COURTYARD

PACKAGES
FD
2'-0"
35'-6" 71'-0" 50'-6"
9"
47'-0"35'-6"
2'-0"
4'-3"
28'-10"
31'-0"13'-6"10'-11"
35'-11"
2'-8"
97'-4" 25'-9"
1'-0"
47'-0"37'-6"
96 gal
96 gal
96 gal
7'-1"5'-0"
96 gal
96 gal
96 gal
96 gal
6' TALL FENCE AT PROPERTY LINE
6' TALL FENCE AT PROPERTY LINE
6' TALL FENCE AT PROPERTY LINE
6' TALL FENCE AT PROPERTY LINE
6' TALL FENCE AT PROPERTY LINE
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

GROUND LEVEL

FLOOR PLAN
A2.1
8 0416
N
1 -

GROUND LEVEL PLAN
3/64"=1'-0" @ 11x173/32"=1'-0" @ 24x36

Page 57 of 132 ends
Page 61 ends

SHOWER
30"x60"

FIRE SERVICE

ELEVATOR
LOBBY
200 SF MIN.
8'-0"
8' MIN.

SHOWER
96 gal
96 gal
EL.

RISER
SHOWER
30"x60"
IDF

LAUNDRY

UNOCCUPIED ROOF OF

EXISTING BUILDING BELOW
35'-6" 26'-6" 26'-6" 18'-0" 12'-6" 2'-6" 35'-6"
157'-1" 11'-7"29'-0"18'-0"37'-6"
10'-3"84'-6"23'-1"
28'-0"
3'-0"
12'-6"26'-6"26'-6"26'-6"
3'-0"
29'-0"
155'-1" 11'-4"
1'-0"
10'-0"82'-6"10'-0"
29'-0"18'-0"35'-6"
4-BR
1,018 SF
2-BR
540 SF
4-BR
1,047 SF
STUDIO
362 SF
3-BR
795 SF
3-BR
795 SF
3-BR
795 SF
4-BR
1,018 SF 4-BR
1,018 SF
2-BR
540 SF
STUDIO
409 SF
3-BR
795 SF
3-BR
795 SF
2-BR
522 SF
MEP 1'-0"
2'-9"
2'-0"
9"
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
LEVELS 2-16

FLOOR PLANS
A2.2
8 0416
N
1 -
PLAN AT LEVELS 2-17
3/64"=1'-0" @ 11x173/32"=1'-0" @ 24x36

Page 58 of 132 ends
Page 62 ends

FIRE SERVICE

ELEVATOR
LOBBY
200 SF MIN.
8'-0"
8' MIN.
15% SOLAR
AREA
MECH.

EQUIPMENT
157'-1" 11'-7"
10'-3"84'-6"23'-1"
155'-1" 11'-4"
1'-0"
10'-0"82'-6"12'-0"
MECH.

ROOF DECK OPEN SPACE

SEE LANDSCAPE DRAWINGS
1'-0"
2'-9"
2'-0"
2'-0"
9"
50'-6"71'-0"35'-6"
47'-0"
35'-6"
29'-0" 82'-7" 43'-6"
47'-0"37'-6"
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

ROOF DECK

LEVEL FLOOR
PLAN
A2.3
8 0416
N
1 -

PLAN AT ROOF DECK
3/64"=1'-0" @ 11x173/32"=1'-0" @ 24x36

Page 59 of 132 ends
Page 63 ends

SHATTUCK

ROOF DECK
PL
PL

BANCROFT

ROOF DECK
PL
PL

LOBBY/LEASINGENTRY/CAFE MEPCIRCULATION MEP TRASH LOADINGUNITS LEVEL 2
AVE. GRADE
18'-0" 10'-3" 10'-3" 10'-3"10'-3" 10'-3"10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
LEVEL 11
LEVEL 12
LEVEL 13
LEVEL 14
LEVEL 15
LEVEL 17
11'-3"10'-3"LEVEL 16
183'-0"
T.O. ROOF
T.O. GLASS RAILING
5'-0" 10'-0"
ELEV. OVERRUN

LOWEST GRADE
LEVEL 2
AVE. GRADE
18'-0" 10'-3" 10'-3" 10'-3"10'-3" 10'-3"10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
LEVEL 11
LEVEL 12
LEVEL 13
LEVEL 14
LEVEL 15
LEVEL 17
11'-3"10'-3"LEVEL 16
183'-0"
T.O. ROOF
T.O. GLASS RAILING
5'-0" 10'-0"
ELEV. OVERRUN

LOWEST GRADE

BUILDING

SECTIONS
A3.0
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
1 -

E-W BUILDING SECTION
3/128"=1'-0" @ 11X17 3/64" = 1'-0" @ 24X368 041632
2 -

N-S BUILDING SECTION
3/128"=1'-0" @ 11X17 3/64" = 1'-0" @ 24X368 041632

Page 60 of 132 ends
Page 64 ends

LEVEL 2
AVE. GRADE
18'-0" 10'-3" 10'-3" 10'-3"10'-3" 10'-3"10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
LEVEL 11
LEVEL 12
LEVEL 13
LEVEL 14
LEVEL 15
LEVEL 17
11'-3"10'-3"
LEVEL 16
183'-0"
T.O. ROOF
T.O. GLASS RAILING
5'-0" 10'-0"
ELEV. OVERRUN

LOWEST GRADE
T.O.(E) ROOF

LOWEST GRADE

ALONG SHATTUCK
32'-0"
T.O. ROOF
176'-0"

BUILDING

ELEVATIONS
A3.1
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
1 A3.1

EAST ELEVATION
3/64"=1'-0" @ 11X17 3/32" = 1'-0" @ 24X368 041632
(BANCROFT)
2274 SHATTUCK 2276 SHATTUCK2270 SHATTUCK2090 KITTREDGE

ALUMINUM

WINDOWS

METAL INFILL
PANEL

STUCCOMETAL FINS

Page 61 of 132 ends
Page 65 ends

LEVEL 2
AVE. GRADE
18'-0" 10'-3" 10'-3" 10'-3"10'-3" 10'-3"10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
LEVEL 11
LEVEL 12
LEVEL 13
LEVEL 14
LEVEL 15
LEVEL 17
11'-3"10'-3"
LEVEL 16
183'-0"
T.O. ROOF
T.O. GLASS RAILING
5'-0" 10'-0"
ELEV. OVERRUN

LOWEST GRADE

BUILDING

ELEVATIONS
A3.2
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
1 A3.2

NORTH ELEVATION
3/64"=1'-0" @ 11X17 3/32" = 1'-0" @ 24X368 041632

EXISTING

NEIGHBORING

BUILDING

ALUMINUM

WINDOWS

METAL INFILL
PANEL

STUCCOMETAL FINS

Page 62 of 132 ends
Page 66 ends

LEVEL 2
AVE. GRADE
18'-0" 10'-3" 10'-3" 10'-3"10'-3" 10'-3"10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
LEVEL 11
LEVEL 12
LEVEL 13
LEVEL 14
LEVEL 15
LEVEL 17
11'-3"10'-3"
LEVEL 16
183'-0"
T.O. ROOF
T.O. GLASS RAILING
5'-0" 10'-0"
ELEV. OVERRUN

LOWEST GRADE

BUILDING

ELEVATIONS
A3.3
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
(BANCROFT)
1 A3.3

WEST ELEVATION
3/64"=1'-0" @ 11X17 3/32" = 1'-0" @ 24X368 041632

EXISTING

NEIGHBORING

BUILDING

EXISTING

NEIGHBORING

BUILDING

ALUMINUM

WINDOWS

METAL INFILL
PANEL

STUCCOMETAL FINS

Page 63 of 132 ends
Page 67 ends

LEVEL 2
AVE. GRADE
18'-0" 10'-3" 10'-3" 10'-3"10'-3" 10'-3"10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
LEVEL 11
LEVEL 12
LEVEL 13
LEVEL 14
LEVEL 15
LEVEL 17
11'-3"10'-3"
LEVEL 16
183'-0"
T.O. ROOF
T.O. GLASS RAILING
5'-0" 10'-0"
ELEV. OVERRUN

LOWEST GRADE

BUILDING

ELEVATIONS
A3.4
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
(SHATTUCK)
1 A3.4

SOUTH ELEVATION
3/64"=1'-0" @ 11X17 3/32" = 1'-0" @ 24X368 041632

ALUMINUM

WINDOWS

METAL INFILL
PANEL

STUCCOMETAL FINS

Page 64 of 132 ends
Page 68 ends

STREET STRIP

ELEVATION
A3.5
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
1 -
STREET STRIP ELEVATION @ BANCROFT
-"=1'-0" @ 11X17 -" = 1'-0" @ 24X368 041632
2274 SHATTUCK
(FRONTAGE ON BANCROFT)
2031 BANCROFT 2020 KITTREDGE2041 BANCROFTSHATTUCK AVE.
(SUBJECT PROPERTY)

Page 65 of 132 ends
Page 69 ends

STREET STRIP

ELEVATION
A3.6
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
1 -
STREET STRIP ELEVATION @ SHATTUCK
-"=1'-0" @ 11X17 -" = 1'-0" @ 24X368 041632
2274 SHATTUCK 2286-2278 SHATTUCK BANCROFT WAY 2322 SHATTUCK2272 SHATTUCK2090 KITTREDGEKITTREDGE STREET2200-2240 SHATTUCK (BERKELEY PUBLIC LIBRARY) (SUBJECT PROPERTY)

Page 66 of 132 ends
Page 70 ends

PHOTO CONTEXT
VIEWS
A3.7
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
1 -

SHATTUCK LOOKING NORTH - BEFORE
2 -

SHATTUCK LOOKING NORTH - AFTER
3 -

SHATTUCK LOOKING SOUTH - BEFORE
4 -

SHATTUCK LOOKING SOUTH - AFTER

Page 67 of 132 ends
Page 71 ends

PHOTO CONTEXT
VIEWS
A3.8
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
1 -

BANCROFT LOOKING WEST - BEFORE
2 -

BANCROFT LOOKING WEST - AFTER
3 -

BANCROFT LOOKING EAST - BEFORE
4 -

BANCROFT LOOKING EAST - AFTER

Page 68 of 132 ends
Page 72 ends

RENDERED

PERSPECTIVE
A3.9
1 -

CONCEPTUAL RENDERING - SHATTUCK LOOKING WEST
N.T.S.

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 69 of 132 ends
Page 73 ends

RENDERED

PERSPECTIVE
A3.10
1 -

CONCEPTUAL RENDERING - SHATTUCK ENTRY
N.T.S.

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 70 of 132 ends
Page 74 ends

RENDERED

PERSPECTIVE
A3.11
1 -

CONCEPTUAL RENDERING - CAFE INTERIOR
N.T.S.

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
A3.10B

Page 71 of 132 ends
Page 75 ends

RENDERED

PERSPECTIVE
A3.10C
1 -

CONCEPTUAL RENDERING - COURTYARD
N.T.S.

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 72 of 132 ends
Page 76 ends

RENDERED

PERSPECTIVE
A3.10D
1 -

CONCEPTUAL RENDERING - RESIDENTIAL LOBBY
N.T.S.

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 73 of 132 ends
Page 77 ends

RENDERED

PERSPECTIVE
A3.11
1 -

CONCEPTUAL RENDERING - BANCROFT LOOKING WEST
N.T.S.

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 74 of 132 ends
Page 78 ends

RENDERED

PERSPECTIVE
A3.12
1 -

CONCEPTUAL RENDERING - BANCROFT ENTRY
N.T.S.

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 75 of 132 ends
Page 79 ends

RENDERED

PERSPECTIVE
A3.13
1 -

CONCEPTUAL RENDERING - BANCROFT LOOKING EAST
N.T.S.

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 76 of 132 ends
Page 80 ends

RENDERED

PERSPECTIVE
A3.14
1 -

CONCEPTUAL RENDERING - SHATTUCK LOOKING NORTH
N.T.S.

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 77 of 132 ends
Page 81 ends

RENDERED

PERSPECTIVE
A3.15
1 -

CONCEPTUAL RENDERING - SHATTUCK LOOKING SOUTH
N.T.S.

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 78 of 132 ends
Page 82 ends

1 -

EXAMPLE IMAGES OF PAST FACADE RENOVATIONS
-

HISTORIC
FACADE

RESTORATION
A4.0
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
~1932~1968~1974~1980~2023
2 -

EXISTING FACADE CHANGES
-
3 -

PROPOSED FACADE RESTORATIONS
-

REMOVE RECENT

NON-HISTORIC PAINT

VIA APPROVED

METHODS THAT DO NOT

DAMAGE THE EXISTING
STUCCO

EXISTING STUCCO

FACADE, RESTORE TO

EARLIER SIMPLE WHITE
COLOR

REMOVE RECENT

NON-HISTORIC MARQUIS

REMOVE RECENT

NON-HISTORIC

STOREFRONTNEW STOREFRONT

SYSTEM, MATERIALS TO

MATCH PROPOSED NEW

BUILDING BEYOND

NEW SIGNAGE

REMOVE RECENT

NON-HISTORIC STONE

CLADDING

NEW AWNING

NEW ACCENT PAINT TO

HIGHLIGHT EXISTING

RELIEF SCULPTURES

Page 79 of 132 ends
Page 83 ends

LEVEL 2
AVE. GRADE
18'-0" 10'-3" 10'-3" 10'-3"10'-3" 10'-3"10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" 10'-3" LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
LEVEL 11
LEVEL 12
LEVEL 13
LEVEL 14
LEVEL 15
LEVEL 17
11'-3"10'-3"
LEVEL 16
183'-0"
T.O. ROOF
T.O. GLASS RAILING
5'-0" 10'-0"
ELEV. OVERRUN

LOWEST GRADE

BUILDING

MATERIALS
MAT

ALUMINUM

WINDOWS &

METAL INFILL
STUCCO
1 -

SOUTH ELEVATION
1/32"=1'-0" @ 11X17 1/16" = 1'-0" @ 24X368 0416

ALUMINUM

WINDOWS
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL
32 (SHATTUCK)

METAL INFILL
PANEL
STUCCO

METAL INFILL
PANEL

Page 80 of 132 ends
Page 84 ends

11 POLLINATOR GARDEN

POLLINATOR GARDEN
N0’ 4’8’ 8’
SCALE: 1/8”= 1’-0”
13 12
12 9
1 2
3 4
5 6
7 8
9 10
11 12
13 5’ ACCESS PATH

PRIVATE PATIO

CENTRAL COURTYARD & OUTDOOR SEATING AREA

STORMWATER TREATMENT AREA

PREFABRICATED PLANTER, TYP

PLANTING AREA, TYP
6’ FENCE AND EMERGENCY EGRESS GATE

BENCH, TYP

EXISTING TREE TO REMAIN, TYP

PROPOSED STREET TREE, TYP
(9) SHORT TERM BIKE RACK PER CITY STANDARDS, TYP . (18 STALLS)

CITY STANDARD SIDEWALK
4’X8’ TREE WELL, PER CITY STANDARDS, TYP
LEGEND
4 2270 SHATTUCK

EXISTING COMMERCIAL USE
2276 SHATTUCK

EXISTING COMMERCIAL USE
2031 BANCROFT

EXISTING COMMERCIAL USE
1 1
2 5
5 2
2 3
6 6
6 6
11 10
8 4
7 7
7 9
4 6
SHATTUCK AVE.

PROPERTY LINE
4-BR
4-BR

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 81 of 132 ends
Page 85 ends

0’ 4’8’ 8’
SCALE: 1/8”= 1’-0”
N
6 6
1 1
1 22
2 2
2 2
3 3
11 3
3 3
3 4
4 4
5 5
5 5
6 7
7 8
9 10
11 11
11 10
10 98
8 7

STUDY AREA

PREFAB RAISED PLANTER, TYP

LOW GREENROOF PLANTING

FRAME STR

UCTURE ABOVE

BAR TABLE AND CHAIRS

BENCH, TYP

LOUNGE FURNITURE

RAISED PLANTER AND BENCH, TYP

STEPPERS

FLEXIBLE SEATING AND GATHERING AREA

GREEN SCREEN
LEGEND
15% SOLAR AREA
MECH.

EQUIPMENT
2 3

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 82 of 132 ends
Page 86 ends

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

08.15.2022 SB-330 APPLICATION

04.26.2023 ZONING APPLICATION
CRLA #3335 · 2 Theatre Square #218 · Orinda CA · 94563
925.254.5422 · www.jett.land
LANDSCAPE ARCHITECTURE + DESIGN

07.27.2023 ZONING APPLICATION

PRECEDENT IMAGES
L2.01

GROUND LEVEL

ROOF GARDEN
BENCH

RAISED PLANTER BENCH FENCE

TABLE AND CHAIRS ROOF PAVERS AND TILESPREFABRICATED PLANTER AND BENCH CHAIRS

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 83 of 132 ends
Page 87 ends

Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

08.15.2022 SB-330 APPLICATION

04.26.2023 ZONING APPLICATION
CRLA #3335 · 2 Theatre Square #218 · Orinda CA · 94563
925.254.5422 · www.jett.land
LANDSCAPE ARCHITECTURE + DESIGN

07.27.2023 ZONING APPLICATION

PLANT IMAGES, NOTES AND

CALCULATIONS
L3.01

GENERAL PLANTING AND IRRIGATION NOTES

1. LANDSCAPE AND IRRIGATION PLANS SHALL COMPLY WITH THE CRITERIA OF THE CALIFORNIA

MODEL WATER EFFICIENCY ORDINANCE AND APPLY THOSE CRITERIA FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLAN.

2. LANDSCAPE AND IRRIGATION PLANS SHALL COMPLY WITH ALL APPLICABLE CITY CODES AND ORDINANCES.

3. ALL PLANTING AREAS SHALL BE TOP-DRESSED WITH A 3” LAYER OF ORGANIC, UN- DYED

MULCH RECYCLED FROM LOCAL ORGANIC MATERIALS SUCH AS TREE TRIMMINGS, PLANT, OR CLEAN WOOD WASTE. COMPOST APPLICATION TO ACHIEVE A MINIMUM OF 6% ORGANIC

MATTER IN SOIL COMPOSITION BASED ON MWELO SPECIFIED SOIL ANALYSIS RESULS FOR THE SITE SOIL PER [CGBSC 4.304].

4. 50% OF ALL SHRUBS AND GROUNDCOVER SHALL BE A MINIMUM OF 5-GALLON SIZE OR LARGER.

5. IRRIGATION SYSTEM IS TO BE A FULLY AUTOMATIC WEATHER-BASED SYSTEM USING LOW FLOW DRIP AND BUBBLER SYSTEM.

6. STREET TREES SHALL BE TIED INTO IRRIGATION SYSTEM.
7 . 75% OF ALL PLANTS PROPOSED ARE NATIVE AND WILD-LIFE SUPPORTING.

8. PLANT SELECTION AND DESIGN TO COMPLY WITH BAY-AREA FRIENDLY BASICS LANDSCAPE CHECKLIST.

IRRIGATION SYSTEM DESIGN INTENT

1. THIS PLAN SHALL COMPLY WITH THE REQUIREMENTS OF THE STATE OF CALIFORNIA’S

MODEL WATER EFFICIENT LANDSCAPE ORDINANCE (MWELO), CITY OF BERKELEY, AND EAST BAY MUNICIPAL UTILITY DISTRICT (EBMUD) WATER DISTRICT.

2. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE THE MINIMUM AMOUNT OF WATER NECESSARY TO SUSTAIN GOOD PLANT HEALTH.

3. THE IRRIGATION SYSTEM IS TO BE A FULLY AUTOMATIC, WEATHER-BASED SYSTEM USING

RAIN SENSOR, LOW FLOW DRIP , BUBBLER DISTRIBUTION, AND ROTOR WITH MATCHED PRECIPITATION RATE NOZZLES DESIGNED FOR HEAD-TO-HEAD COVERAGE.

4. ALL SELECTED COMPONENTS SHALL BE PERMANENT, COMMERCIAL GRADE, SELECTED

FOR DURABILITY, VANDAL RESISTANCE AND MINIMUM MAINTENANCE REQUIREMENT, INSTALLED BELOW-GRADE, AND DESIGNED FOR 100% COVERAGE.

5. THE SYSTEM SHALL INCLUDE A MASTER CONTROL VALVE, RAIN SENSOR AND FLOW

SENSING CAPABILITY CONNECTED TO THE IRRIGATION CONTROLLER WHICH WILL SHUT DOWN ALL OR PART OF THE SYSTEM IF LEAKS ARE DETECTED.

6. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO DELIVER WATER TO HYDROZONES BASED ON MOISTURE REQUIREMENTS OF THE PLANT GROUPING.
7 . COLOR CODED HYDROZONE LANDSACPING HYDROZONE MAP WITH GROUPING AND

COLLOCATING PLANTING MATERIAS BY WUCOLS WATER USE CATEGORY VL, L, M, OR H, PER [CGBSC 4.304}, TO BE PROVIDED IN PERMIT DRAWINGS.

8. RAIN SENSOR AND CONTROLLER LOCATION TO BE PROVIDED IN PERMIT DRAWINGS.

LANDSCAPE AREA CALCULATION:

STORMWATER TREATMENT AREA:

REQUIRED STORMWATER TREATMENT AREA= 4% OF THE ROOF AREA (16810 SF) = 672 SF PROPOSED STORMWATER TREATMENT AREA= 762 SF
TREES
SHRUBS

GROUNDCOVER
VINES

DENOTES BUTTERFLY

POLLINATED SPECIES
BIKE PARKING CALCULATIONS:
(1) COMMERCIAL BIKE PARKING STALL
(16) SHORT TERM RESIDENTIAL BIKE PARKING STALLS
TOTAL SHORT TERM BIKE PARKING STALLS REQUIRED: 17 STALLS TOTAL SHORT TERM BIKE PARKING STALLS PROVIDED: 18 STALLS (9 BIKE RACKS)

LANDSCAPE AREA
LEVEL 1: 2,559 SF
ROOF LEVEL: 1,525 SF
TOTAL: 4,084 SF (69%)

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 84 of 132 ends
Page 88 ends

2276 SHATTUCK

EXISTING

COMMERCIAL USE
2270 SHATTUCK

EXISTING COMMERCIAL USE
SHATTUCK AVE.

MDF/MPOE

SHOP AND

MAINTENANCE
BIKES

EXIT PASSAGEWAY
4,202 SF
FIRE

COMMAND
200 SF LOBBY / STUDY

BANCROFT WAY
3 CY
BIN
3 CY
BIN
TRASH
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal

LAUNDRY
MECH
MAIN

ELECTRICAL
ROOM

GENERATOR

DOMESTIC
PUMP

BACKFLOW
& CHECK
VALVE

FIRE WATER STORAGE

FIRE PUMP

FIRE PUMP

SWITCHGEAR
STO.

MAIL

PACKAGES
5-BR
1,018 SF
2-BR
540 SF
5-BR
1,047 SF

LOBBY CAFE
865 SFW/C
STO.

BOH
W/C
OFFICE
ENTRY
STO.

BOH

PMPM PMPM SIGNSL
L4.01
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

08.15.2022 SB-330 APPLICATION

04.26.2023 ZONING APPLICATION
CRLA #3335 · 2 Theatre Square #218 · Orinda CA · 94563
925.254.5422 · www.jett.land
LANDSCAPE ARCHITECTURE + DESIGN

07.27.2023 ZONING APPLICATION
PRELIMINARY PLANTING PLAN_
GROUND FLOORPERCENTAGE OF NATIVE PLANTS: 75%

POLLINATOR GARDEN
0’ 4’8’ 8’
SCALE: 1/8”= 1’-0”
N
4-BR
4-BR

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 85 of 132 ends
Page 89 ends

96 gal
96 gal
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

08.15.2022 SB-330 APPLICATION

04.26.2023 ZONING APPLICATION
CRLA #3335 · 2 Theatre Square #218 · Orinda CA · 94563
925.254.5422 · www.jett.land
LANDSCAPE ARCHITECTURE + DESIGN

07.27.2023 ZONING APPLICATION
PRELIMINARY PLANTING PLAN_

ROOF PLAN
L4.02
PERCENTAGE OF NATIVE PLANTS: 75% 0’ 4’8’ 8’
SCALE: 1/8”= 1’-0”
N

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 86 of 132 ends
Page 90 ends

2276 SHATTUCK

EXISTING

COMMERCIAL USE
2270 SHATTUCK

EXISTING COMMERCIAL USE
SHATTUCK AVE.

MDF/MPOE

SHOP AND

MAINTENANCE
BIKES

EXIT PASSAGEWAY
4,202 SF
FIRE

COMMAND
200 SF LOBBY / STUDY

BANCROFT WAY
3 CY
BIN
3 CY
BIN
TRASH
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal
96 gal

LAUNDRY
MECH
MAIN

ELECTRICAL
ROOM

GENERATOR

DOMESTIC
PUMP

BACKFLOW
& CHECK
VALVE

FIRE WATER STORAGE

FIRE PUMP

FIRE PUMP

SWITCHGEAR
STO.

MAIL

PACKAGES
5-BR
1,018 SF
2-BR
540 SF
5-BR
1,047 SF

LOBBY CAFE
865 SFW/C
STO.

BOH
W/C
OFFICE
ENTRY
STO.

BOH

PMPM PMPM SIGNSL
L5.01
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

08.15.2022 SB-330 APPLICATION

04.26.2023 ZONING APPLICATION
CRLA #3335 · 2 Theatre Square #218 · Orinda CA · 94563
925.254.5422 · www.jett.land
LANDSCAPE ARCHITECTURE + DESIGN

07.27.2023 ZONING APPLICATION

PRELIMINARY IRRIGATION

PLAN - GROUND FLOOR
0’ 4’8’ 8’
SCALE: 1/8”= 1’-0”
N
4-BR
4-BR

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 87 of 132 ends
Page 91 ends

96 gal
96 gal
Berkeley, CA
2274

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2201JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

08.15.2022 SB-330 APPLICATION

04.26.2023 ZONING APPLICATION
CRLA #3335 · 2 Theatre Square #218 · Orinda CA · 94563
925.254.5422 · www.jett.land
LANDSCAPE ARCHITECTURE + DESIGN

07.27.2023 ZONING APPLICATION

PRELIMINARY IRRIGATION

PLAN - ROOF PLAN
L5.02
0’ 4’8’ 8’
SCALE: 1/8”= 1’-0”
N

11.29.2022 SB-330 APPLICATION

05.22.2023 ZONING APPLICATION

08.09.2023 ZONING RESUBMITTAL

12.08.2023 ZONING RESUBMITTAL

Page 88 of 132 ends
Page 92 ends

20483092.6
Hanson Bridgett LLP
425 Market Street, 26th Floor, San Francisco, CA 94105
ROBIN R. BARAL

SENIOR COUNSEL
DIRECT DIAL (916) 491-3052
DIRECT FAX (916) 491-3085
E-MAIL [email protected]
March 4, 2024

VIA EMAIL
Sharon Gong
Senior Planner
City of Berkely Planning Department
1947 Center Street, 3rd Floor
Berkeley, CA 94704
Re: 2274 Shattuck Avenue – AB 1633 Notice of CEQA Exemption Dear Ms. Gong:

As you know, our office represents the applic
ant team for the proposed mixed-use project at
2274 Shattuck Avenue (“Project”). In accordance with Assembly Bill 1633 (“AB 1633”),1 we request that the City find the Project exempt from review under the California Environmental Quality Act (“CEQA”) pursuant to the "Class 32" exemption for Infill Development Projects,2 as well as the "Class 31" exemption for Historical Resource Restoration/Rehabilitation.3 Substantial evidence supports the application of both the Class 32 and Class 31 exemptions for this Project, as documented in the technical reports submitted with the Project application and concurrently with this letter. Moreover, substantial evidence supports that no exceptions to the exemptions apply.4 We therefore request that the City find the Project exempt from CEQA under Class 32 as well as Class 31, as those exemptions are now mandated by the Housing Accountability Act ("HAA"),5 within the next 90 days.

AB 1633 makes CEQA exemptions mandatory under the Housing Accountability Act for eligible high-density infill residential projects.

AB 1633 amended the HAA as of January 1, 2024, to require that cities find certain high-density infill residential projects, such as this Project, exempt from CEQA. AB 1633 redefines an unlawful disapproval of a housing development project under the HAA (for eligible projects) to now include "any instance in which a local agency… fails to make a determination of whether the project is exempt from [CEQA] or commits an abuse of discretion as defined in [the HAA]."6 1 Gov. Code § 65589.5
2 14 Cal. Code Reg. § 15332
3 14 Cal. Code Reg. § 15331
4 14 Cal. Code Reg. § 15300.2(c) and (f)
5 Gov. Code § 65589.5(h)(6)(D)
6 Id.

Attachment 2

Page 89 of 132 ends
Page 93 ends

Sharon Gong, Senior Planner
March 4, 2024

Page 2 ends

20483092.6
AB 1633 also amended the HAA to include a new statutory definition of "abuse of discretion" as follows: "'abuse of discretion' means the conditions set forth [by AB 1633] are satisfied, but the local agency does not determine that the project is exempt from [CEQA]."7 The legislature therefore expressly modified the standard of review under CEQA to require that cities find eligible, high-density infill residential projects such as this one exempt in any instance in which there is substantial evidence to support a CEQA exemption and lack of exception.8 As a result, an unlawful denial or abuse of discretion now occurs, for eligible high-density infill residential projects, if (1) an applicant provides substantial evidence that the project is eligible for a CEQA exemption and there are no exceptions to the exemption, but (2) the agency fails to find the project exempt.9 The legislature therefore revised the substantial evidence standard to establish that an HAA violation occurs if a city fails to make a mandatory AB 1633/CEQA exemption finding for eligible infill projects.

AB 1633 requires that the City find this Project exempt within 90 days.

By rewriting the substantial evidence standard to favor housing production, the legislature intended that AB 1633 CEQA exemption findings be made promptly – i.e., within 90 days after the submission of this notice.10 The HAA allows cities to extend the 90-day deadline by an additional 90 days. An extension, however, is only authorized if "necessary to determine if there is substantial evidence in the record that the housing development project is eligible for the exemption."11 In this case, the applicant has provided all of the reports and studies needed to support the exemption. The reports submitted concurrently with this letter constitute substantial evidence to support all of the necessary findings for the Class 32 and Class 31 CEQA exemptions. As such, there is no legal basis or need for the City to peer review or provide additional studies to document the Class 32 and Class 31 CEQA exemptions for this Project.

The applicant therefore requests that the City promptly find that the Project is exempt under both the Class 31 and Class 32 CEQA exemptions, and that no exceptions to these exemptions apply. We request that this decision be made within the next 30-60 days but in no case should the determination require more than 90 days for this Project.

This Project meets all of the requirements for a mandatory Class 32 CEQA exemption.

Project Description
Trachtenberg Architects is the applicant for this Project, which proposes to construct a 214,082 square-foot mixed-use project at 2274 Shattuck Avenue, at the corner of Shattuck Avenue and Bancroft Way. The project sponsor is 2274 Shattuck QOZB, LLC (Panoramic Interests). The Project is located on the east side of Shattuck Avenue, with frontage on Shattuck Avenue and the north side Bancroft Way. The Project entails renovation of the commercial frontage on Shattuck Avenue, and renovations to the interior foyer and lobby, with a café and repurposed commercial space that celebrates the site’s prior use as a theater. The ground floor and roof will include open space and other amenities for Project residents. The subdivided theater space will be demolished to facilitate the construction of 227 housing units. The units will be diverse in

7 Gov. Code § 65589.5(h)(6)(D)(ii)(I)
8 Gov. Code § 65589.5(h)(6)(D)(i)(IV)
9 Gov. Code § 65589.5(h)(6)(D)(i)(IV)
10 Gov. Code § 65589.5(h)(6)(D)(i)(V)(ia)
11 Id. subd. (h)(6)(D)(i)(V)(ic)

Page 90 of 132 ends
Page 94 ends

Sharon Gong, Senior Planner
March 4, 2024

Page 3 ends

20483092.6
size, consisting of 32 studios, 49 two-bedrooms, 80 three-bedrooms, and 66 four-bedrooms. In accordance with state density bonus law, 23 of those units will be reserved for very-low income households earning no more than 50% of the area median income (AMI) for Alameda County.

The following reports support the findings fo r the Class 32 CEQA exemption: (1) Traffic Impact Analysis, 2274 Shattuck Avenue Project, Abrams Associates, dated August 9, 2023 (Attachment 1); (2) 2274 Shattuck Avenue Historic Resources Evaluation Memorandum, West Coast Architectural History, dated December 7, 2023 (Attachment 2); (3) 2274 Shattuck Avenue Project Impacts Analysis Memorandum, Left Coast Architectural History, dated March 1, 2024 (Attachment 3); (4) Air Quality Impacts Analysis for the 2274 Shattuck Avenue Mixed Use Project in Berkeley, California, FirstCarbon Solutions, dated March 1, 2024 (Attachment 4); (5) Noise Impact Analysis for the 2274 Shattuck Avenue Mixed Use Project in Berkeley, California, FirstCarbon Solutions, dat ed March 1, 2024 (Attachment 5), and (6) Water Quality Impact Analysis for the 2274 Shattuck Avenue Mixed Use Project in Berkeley, California, FirstCarbon Solutions, dated March 1, 2024 (Attachment 6). The Historic Resources Evaluation and Project Impact Analysis also support the findings for the Class 31 CEQA exemption.

AB 1633 Eligibility Criteria
The HAA requires the Project to meet the following criteria in order to qualify for a mandatory CEQA exemption:

1. The Project cannot be on an environmentally sensitive site or a site subject to certain environmental hazards;

2. The Project must be on a legal parcel, in an urbanized area that is also a transit priority area, low vehicle miles traveled area, or amenity-rich area;

3. The density of the housing development project must meet or exceed 15 dwelling units per acre; and

4. There must be substantial evidence in the record that the Project qualifies for an exemption and is not subject to any exceptions.

As detailed below, the Project satisfies each criterion and is therefore subject to a mandatory Class 32 CEQA exemption under AB 1633. In other words, this Project meets all requirements imposed by the state legislature to facilitate expedited review under the HAA for high-density residential infill projects. The applicable findings, backed by substantial evidence as detailed below, demonstrate that this Project is categorically exempt under CEQA, and that a decision to the contrary would constitute an unlawful denial under the HAA.12

1. The Project is not located on an environmentally sensitive site and it is not subject to certain environmental hazards.

AB 1633 requires the Project to not be located on any site that is environmentally sensitive, subject to certain environmental hazards, or within a very high fire hazard severity zone. 13 The
following environmentally sensitive sites and hazards must be avoided: (A) coastal zones;

12 Gov. Code § 65589.5(h)(6)(D)(i)
13 See Gov. Code § 65589.5(h)(6)(D)(i)(l), citing Gov. Code § 65913.4(a)(6)(A)-(C) and (E)-(K)

Page 91 of 132 ends
Page 95 ends

Sharon Gong, Senior Planner
March 4, 2024

Page 4 ends

20483092.6
(B) prime farmland; (C) wetlands; (D) hazardous waste sites; (E) earthquake fault zones; (F) flood hazard areas; (G) regulatory floodways; (H) conservation lands; (I) habitat for protected species; (J) conservation easements; and (K) very-high fire severity zones. As detailed below, the Project site does not contain any of these characteristics.

A. The Project is not in the Coastal Zone.

AB 1633 applies to projects that are generally not located in an area of the Coastal Zone.14 The "Coastal Zone" is the land and water area along the entire the California Coast that generally extends 1,000 yards from the mean high tide line of the sea, and is identified on a detailed map adopted by the Coastal Commission.15 The City of Berkely is not within the Coastal Zone, as documented in Attachment 7 attached to this letter.

B. The Project is not located on prime farmland.

AB 1633 applies to projects that are not (i) located on prime farmland or farmland of statewide importance, as defined by the United States Department of Agriculture and designated on the maps prepared by the Farmland Mapping and Monitoring Program of the Department of Conservation, or (ii) zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction. 16 It should be abundantly
clear that the existing site is not located on prime farmland or farmland of statewide importance, and is not otherwise zoned for agricultural protection. Substantial evidence to support this finding is provided by reference to the Department of Conservation’s Important Farmland Finder Map, where the Project site is identified as Urban and Built Up Land. (See Attachment 7).17

C. The Project site is not located in a wetland.

AB 1633 applies to projects that are not located on federally designated wetlands.18 The Project site is an infill, urbanized location that has no water features. Accordingly, the U.S. Fish & Wildlife Service has determined the site does not contain any potential for wetlands or aquatic resources.(See National Wetlands Inventory in Attachment 7).19

14 See, e.g., Gov. Code, §§ 65913.4(a)(6)(A)(ii) [“An area of the coastal zone that is not subject to a certified local coastal program or certified land use plan.”]; 65913.4(a)(6)(A)(iv) [“In a parcel within the coastal zone that is not zoned for multifamily housing.”]; 65589.5 (h)(6)(D)(i)(I)(ia); 65913.4(a)(6)(A).) 15 Pub. Res. Code § 30103.
16 Gov. Code, §§ 65589.5(h)(6)(D)(i)(I)(ia); 65913.4(a)(6)(B). 17 California Department of Conservation, California Important Farmland Finder [https://maps.conservation.ca.gov/DLRP/CIFF/], last accessed on February 21, 2024 18 Gov. Code, §§ 65589.5 (h)(6)(D)(i)(I)(ia); 65913.4(a)(6)(C) 19 See U.S. Fish and Wildlife Service, National Wetlands Inventory https://www.fws.gov/wetlands/, last accessed on February 21, 2024

Page 92 of 132 ends
Page 96 ends

Sharon Gong, Senior Planner
March 4, 2024

Page 5 ends

20483092.6
D. The Project is not located on a hazardous waste site.

AB 1633 generally applies to projects that are not located on the "Cortese List" or on hazardous waste sites designated by the Department of Toxic Substances Control ("DTSC").20 The Project site is not listed on either of these lists and is not located on a hazardous waste site.21

E. The Project is not located in a fault zone.

AB 1633 applies to projects that are not located “[w]ithin a delineated earthquake fault zone as determined by the State Geologist in any official maps published by the State Geologist, unless the development complies with applicable seismic protection building code standards adopted by the California Building Standards Commission under the California Building Standards Law.22 The Project is not located within a delineated earthquake fault zone on an official map published by the United States Geologic Service (“USGS”) (see Attachment 7). 23 F. The Project is not located in a special flood hazard area or regulatory floodway.

AB 1633 applies to projects that are not located “[w]ithin a special flood hazard area subject to inundation by the 1 percent annual chance flood (100-year flood) as determined by the Federal Emergency Management Agency ("FEMA") in any official maps published by [FEMA],"24 and to projects that are not located “[w]ithin a regulatory floodway as determined by [FEMA] in any official maps published by [FEMA]. The Project is not located in a special flood hazard area25 or regulatory floodway26 as determined by FEMA (see Attachment 7).

G. The Project site is not identified in a natural resource protection plan.

AB 1633 applies to projects that are not located on land identified for conservation in (i) an adopted natural community conservation plan under the California Fish and Game Code, (ii) a habitat conservation plan pursuant to the federal Endangered Species Act, or (iii) another adopted natural resource protection plan.27 The Project is located on an urban, infill site in Downtown Berkeley. It is not located in an adopted natural community conservation plan,

20 Gov. Code, §§ 65589.5 (h)(6)(D)(i)(I)(ia); 65913.4(a)(6)(E); 65962.5; Health and Safety Code § 78760. Note that certain sites on the Cortese List may still be eligible under AB 1633, however those provisions do not apply here as this site is not on the Cortese List.
21 DTSC, Hazardous Waste and Substance Site List,
https://www.envirostor.dtsc.ca.gov/public/search?cmd=search&reporttype=CORTESE&site_type=CSITES,FUDS&sta tus=ACT,BKLG,COM&reporttitle=HAZARDOUS+WASTE+AND+SUBSTANCES+SITE+LIST+%28CORTESE%29, last accessed on February 21, 2024.) The Cortese list as of February 21, 2024, is incorporated by refence into the project's administrative record of proceeding
22 Gov. Code §§ 65589.5 (h)(6)(D)(i)(I)(ia); 65913.4(a)(6)(F) 23 See USGS, U.S. Quaternary Faults Map https://www.usgs.gov/programs/earthquake-hazards/faults, last accessed on February 21, 2024
24 Gov. Code §§ 65589.5(h)(6)(D)(i)(I)(ia); 65913.4(a)(6)(G) 25 See FEMA, National Flood Hazard Layer Viewer https://www.fema.gov/flood-maps/national-flood-hazard-layer, last accessed on February 21, 2024
26 Id.
27 Gov. Code §§ 65589.5 (h)(6)(D)(i)(I)(ia); 65913.4(a)(6)(I)

Page 93 of 132 ends
Page 97 ends

Sharon Gong, Senior Planner
March 4, 2024

Page 6 ends

20483092.6
habitat conservation plan or any other adopted natural resource protection plan (see Attachment 7).28

H. The Project site is not habitat for protected species.

AB 1633 applies to projects that are not located on habitat for candidate, sensitive, or special status species as identified under the federal Endangered Species Act, the California Endangered Species Act, or the Native Plant Protection Act.29 The Project site is located in the urban landscape of Downtown Berkeley and has no value as habitat for any listed species.

I. The Project site is not under a conservation easement.

AB 1633 applies to projects that are not located on lands under conservation easement.30 The Project site is in an entirely urbanized infill location, and accordingly is not encumbered by any conservation easement (see Attachment 7).31

J. The Project is not located in a Very High Fire Hazard Severity Zone.

AB 1633 applies to projects that are not located within a very high fire hazard severity zone, as determined by the Department of Forestry and Fire Protection, or within a high or very high fire hazard severity zone as indicated on maps adopted by the Department of Forestry and Fire Protection.32 The Project is not located in a very high fire hazard severity zone (see Attachment 7).33

2. The Project is located on a legal parcel, in an urbanized area as defined by AB 1633.

AB 1633 applies to a housing development project "located on a legal parcel or parcels within an urbanized area" that meets at least one of the following criteria:

(ia) The housing development project is located within one-half mile walking distance to either a high-quality transit corridor or a major transit stop;

(ib) The housing development project is located in a very low vehicle travel area; or

(ic) The housing development project is proximal to six or more of the following amenities pursuant to subclause (IV) of clause (ii) as of the date of submission of the project application:

28 California Department of Fish and Wildlife, California Natural Community Conservation Plans (August 2023); see also Federal Conservation Plans of West Coast https://www.fisheries.noaa.gov/west-coast/habitat- conservation/habitat-conservation-plans-west-coast, last accessed on February 21, 2024 29 Gov. Code §§ 65589.5(h)(6)(D)(i)(I)(ia); 65913.4(a)(6)(J) 30 Gov. Code §§ 65589.5 (h)(6)(D)(i)(I)(ia); 65913.4(a)(6)(K) 31 (See California Natural Resources Agency, California Conservation Easement Database [https://data.cnra.ca.gov/dataset/california-conservation-easement-database]; [https://databasin.org/datasets/65202ded0d40478a847f019630950570/], last accessed on February 21, 2024 32 Gov. Code, § 65589.5(h)(6)(D)(i)(I)(ia)
33 See Dept. of Forestry and Fire Protection https://osfm.fire.ca.gov/what-we-do/community-wildfire-preparedness- and-mitigation/fire-hazard-severity-zones/fire-hazard-severity-zones-maps, last accessed on February 21, 2024

Page 94 of 132 ends
Page 98 ends

Sharon Gong, Senior Planner
March 4, 2024

Page 7 ends

20483092.6
(IV) “Proximal” to an amenity means either of the following:

(ia) Within one-half mile of either of the following amenities:

(Ia) A bus station.

(Ib) A ferry terminal.

(ib) Within two miles of any of the following amenities:

(Ia) A supermarket or grocery store.

(Ib) A public park.

(Ic) A community center.

(Id) A pharmacy or drugstore.

(Ie) A medical clinic or hospital.

(If) A public library.

(Ig) A school that maintains a kindergarten or any of grades 1 to 12, inclusive

(id) Parcels that are developed with urban uses adjoin at least 75 percent of the perimeter of the project site or at least three sides of a four-sided project site. For purposes of this clause, parcels that are only separated by a street or highway shall be considered to be adjoined.
34 Although only required to meet one of the four "urbanized area" scenarios, the Project meets all four, as the Project is:

• Located within a transit priority area designated by the City of Berkeley, which means it is within 1/2-mile from a rail station and/or 1/4-mile from bus stops with service at least every 15 minutes. This is supported by the transit priority area map included in the City's VMT Criteria and Thresholds guidance, which establishes that the Project site is within 1/2-mile from a rail station or 1/4-mile from bus stops with service at least every 15 minutes. (See Attachment 7.) • Located in a very low vehicle travel area. A “very low vehicle travel area” means an urbanized area, as designated by the United States Census Bureau, where the existing residential development generates vehicle miles traveled ("VMTs") per capita that is below 85 percent of either regional vehicle miles traveled per capita or city vehicle miles traveled per capita. (Gov. Code, § 659159(o)(9).) The City defines low-VMT areas based on the results of the Alameda County Transportation Commission model, and depicts these areas in the map included

34 Gov. Code §65589.5 (h)(6)(D)(i)(II)

Page 95 of 132 ends
Page 99 ends

Sharon Gong, Senior Planner
March 4, 2024

Page 8 ends

20483092.6
in Exhibit I. The areas shaded green are those identified as "Low VMT Areas," where "VMT per capita … is 15% lower than the baseline regional average."35 The Project is located in a Low VMT Area (see Attachment 7). • Located proximal to the following amenities:
• Numerous bus stops;
• W ithin one mile of a supermarket or grocery store (Trader Joe’s); • W ithin one mile of a public park (Martin Luther King Jr. Civic Center Park and Ohlone Park);
• W ithin one mile of a community center (Multicultural Community Center); • Within one mile of a pharmacy or drugstore (CVS pharmacy); • W ithin one mile of a public library (Berkeley Public Library); • W ithin one mile of a school that maintains a kindergarten or any of grades 1 to 12, inclusive (Washington Elementary School).
• L ocated in an urban area, on a property surrounded on all sides by urban uses.

The Project therefore meets all of the urbanized criteria for a mandatory CEQA exemption.

3. The Project's density qualifies under AB 1633.

AB 1633 applies to projects that meet or exceed 15 dwelling units per acre.36 Here, the Project proposes 227 dwelling units on 0.51 acres, resulting in a density of more than 440 dwelling units per acre.

4. Substantial evidence establishes that the Project is exempt under Class 32 and Class 31, and there are no applicable exceptions.

A. Substantial evidence supports the Class 32 exemption.

The Class 32 exemption applies to infill development projects that are (a) consistent with the applicable general plan and zoning designation, (b) on a site smaller than five acres and substantially surrounded by urban uses with no potential value as habitat for endangered, rare or threatened species, and where (c) approval of the project would not result in any significant effects relating to traffic, noise, air quality or water quality, and (d) the site can be adequately served by all required utilities and public services.
37 35 City of Berkeley VMT Criteria and Thresholds, June 29, 2020, p. 7 and attachments https://berkeleyca.gov/sites/default/files/2022-02/VMT-Criteria-and-Thresholds.pdf, last accessed on February 21, 2024.
36 Gov. Code § 65589.5(h)(6)(D)(i)(III)
37 14 Cal. Code Reg. § 15332

Page 96 of 132 ends
Page 100 ends

Sharon Gong, Senior Planner
March 4, 2024

Page 9 ends

20483092.6
Here, the City has already conclusively established that the Project is consistent with the applicable general plan and zoning standards, given that no notice or other documentation was provided to the applicant within 30 days after the City deemed the zoning application complete.38 The site is approximately one-half acre and, as noted above, has no potential habitat value.

The applicant submitted a traffic report with the zoning application to confirm that the Project meets the City's local VMT threshold and is screened from further review due to its location within a transit priority area. Concurrently submitted with this letter are additional reports confirming that the Project will not result in impacts related to air quality, noise and water quality.

B. Substantial evidence supports the Class 31 exemption.

While the Class 32 exemption is sufficient for clearing this Project from environmental review, the Class 31 exemption also applies here. Class 31 "consists of projects limited to maintenance, repair, stabilization, rehabilitation, restoration, preservation, conservation or reconstruction of historical resources in a manner consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings."
39 The Historic Resources Evaluation recently conducted for the Project site, and submitted as part of the zoning application, establishes the remaining historical context of the Project site. The Project Impact Analysis (PIA) analyzes the Project in connection with the site's historical context and with the proposed Shattuck Avenue Downtown Historic District. The PIA concludes that the Project will not cause a significant impact on any historical resources. In connection with that finding, the PIA establishes that implementation of the Project will be consistent with the Secretary of Interior's Standards for Rehabilitation pursuant to the SOI Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, & Reconstructing Historic Buildings (1995, rev. 2017).

C. Substantial evidence supports the finding that no exceptions may be found to the Class 32 or Class 31 CEQA exemptions for this Project.

Under CEQA, an exception may prohibit the application of a categorical exemption if the Project (a) is located in an environmentally sensitive area; (b) causes cumulative impacts due to successive projects implemented of the same type, in the same place; (c) causes a significant impact due to unusual circumstances; (d) causes damage to scenic resources within a state scenic highway; (e) is on the "Cortese List" of hazardous sites; or (f) causes a substantial adverse change in the significance of a historical resource. 40 None of these exceptions apply here. The Project is located in Downtown Berkeley, and does not contain environmentally sensitive features, as the building envelope is virtually coextensive with the entire parcel. There are no cumulative impacts resulting from the City's implementation of the Downtown Area Plan, which the City adopted for the purpose of reducing environmental impacts, such as vehicle-miles traveled, by locating higher density housing near high-quality public transit and near the University of California, Berkeley campus. There are no unusual circumstances associated with this Project, as it proposes a high-quality mixed-use development in the Downtown Berkeley core area, consistent with the goals of the Downtown

38 Gov. Code § 65589.5(j)(2)(A)(i)
39 14 Cal. Code Reg. § 15331
40 14 Cal. Code Reg. § 15300.2

Page 97 of 132 ends
Page 101 ends

Sharon Gong, Senior Planner
March 4, 2024

Page 10 ends

20483092.6
Area Plan. The site will cause no impacts to scenic resources within a state scenic highway (to the extent this criterion even applies after the enactment of SB 743), and the site is not located on the Cortese List. With regard to historical resources, the PIA submitted concurrently with this letter confirms that the Project will not have an impact on any mandatory or potential historical resources, and that implementation of the Project will be consistent with the SOI Standards for Rehabilitation. Given the project's eligibility for a Class 31 exemption, and the findings in the PIA, the Project cannot legally be deemed to have a significant impact on historical resources.

As a result, substantial evidence in the zoning application, materials submitted concurrently with this letter, and the record of proceedings as a whole supports the finding that there are no impacts to historical resources, unusual circumstances, nor any other exceptions that could apply to the Class 31 and Class 32 exemptions for this Project.

In summary, this Project meets all of the criteria under the HAA to qualify as an eligible high-density residential infill project subject to an expedited CEQA exemption under AB 1633.

Given the mandatory effect of the HAA as to this Project, the applicant requests that the City find that the Project is subject to the Class 32 and Class 31 CEQA exemptions and that there are no applicable exceptions to these exemptions. While up to 90 days may be allowed for this decision, the applicant respectfully requests that a decision be made sooner, if possible. As noted above, there is no basis that would justify the City in needing an additional 90 days to respond, given that there is no basis for seeking a peer review of the submitted studies, or preparing additional studies to support the Class 32 exemption.

Thank you for considering this request and please do not hesitate to contact me if you have any questions regarding the applicability of the mandatory Class 32 and Class 31 CEQA exemptions under AB 1633 for this Project.

Very truly yours,

Robin R. Baral
Senior Counsel

cc: Farimah Brown, City Attorney
Anne Hersch, Planning Manager
Client

Page 98 of 132 ends
Page 102 ends

ATTACHMENT 3

Page 99 of 132 ends
Page 103 ends
Page 100 of 132 ends
Page 104 ends
Page 101 of 132 ends
Page 105 ends

Z ONING

A DJUSTMENT S
B OARD
Staff Report
1947 Center Street, Berkeley, CA 94704 Tel: 510.981.7410 TDD: 510.981.7474 Fax: 510.981.7420 E-mail: [email protected]

FOR BOARD ACT
ION
DECEMBER 12, 2024
2274 Shattuck Avenue
Use Permit #ZP2023-0079 to demolish the commercial building (preserving and renovating the front façade and lobby ), and construct a 17-story (183 feet, plus 5-fo ot parapet), 214,032-square-foot, mixed-use residential building with 227 dwelling units (including 23 Very Low -Income Density Bonus qualifying units), and one ADA parking space.

I. Background
A. Land Use Des
ignations:
• General Plan: DT – Downtown; Downtown Area Plan
• Zoning: C-DMU (Corridor) – Downtown Mixed-Use Commercial District – Corridor Sub-Area
B. Zoning Permits Required:
• Use Permit under BMC Section 23.326.070(A) to demolish a non- residential building
• Use Permit under BMC Section 23.204.020(A) to construct a new mixed- use residential development
• Use Permit under BMC Section 23.204.020(A) to construct dwelling units • Use Permit under BMC Section 23.204.030(B)(1) to create new floor area of 10,000 square feet or more
• Use Permit under BMC Section 23.204.130(E)(1) to exceed the maximum building height limit, up to 75 feet (plus 5-foot parapet, by right) • Use Permit under BMC Section 23.04.130(E)(3)(b) to modify front and side setback requirements
• Administrative Use Permit under BMC Section 23.304.050(A) to exceed building height limits with rooftop architectural elements which exceed the maximum height limit for the district
C. Concessions and Waivers Requested Pursuant to State Density Bonus Law (California Government Code Section 65915):
• Concession – none.

Item 6
ZAB 2024-12-12

Page 1 of 28 ends

1 of 142
ATTACHMENT 4

Page 102 of 132 ends
Page 106 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 2 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx • Waiver of BMC Section 23.04.130(E)(1) to exceed building height limits – to be 183 feet to roof (plus 5-foot parapet, by right), where 75 feet is the limit (plus 5- foot parapet by right)
• Waiver of BMC Section 23.204.130(E)(3)(b) to waive front and side setback minimums
• Waiver of BMC Section 23.204.130(E)(3) to increase front setback maximum to 7-foot, 1 inch, where 5 feet maximum is required, at 0-20-foot building height; • Waiver of BMC Section 23.204.130(E)(3)(b)(i) to exceed 120 feet in width in diagonal measurement above 120 feet in height – to be 178 feet, 9 inches in width, where 120 feet is required
• Waiver of BMC Section 23.204.130(E)(4) to reduce the usable open space requirement – to provide 7,737 square feet, where 18,160 square feet is required • Waiver of BMC Section 23.322.090(A) to provide 72 long term residential bicycle parking, where 210 is required

D. The California Environmental Quality Act (CEQA) Exemption Determination:

Pursuant to Government Code Section 65589.5 , i t is staff’s determination that the project is categorically exempt under Section 15332 (“Infill Development Projects”) of the CEQA Guidelines.

E. Project Recommendation: Approve Use Permit #ZP2023- 0079, pursuant to BMC Section 23.406.040(D).

F. Parties Involved:
• Applicant Isaiah Stackhouse, 2421 Fourth St., Berkeley, CA 94710 • Property Owner 2274 Shattuck QOZB, LLC, C/O JP Walsh, 2539 Telegraph Avenue, Suite 101, Berkeley CA 94704

Item 6
ZAB 2024-12-12

Page 2 of 28 ends

2 of 142

Page 103 of 132 ends
Page 107 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 3 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx Figure 1: Zoning Map

Legend

AC Transit Bus Route
C-DMU: Downtown Mixed-Use
District
Core: C-DMU Core Sub-Area
Buffer: C-DMU Buffer Sub-Area
Corridor: C-DMU Corridor Sub-Area
Outer Core: C-DMU Outer Core Sub-Area

U.C. Berkeley
Campus
R-5
C-DMU
Buffer
R-SMU
Project Site
Item 6
ZAB 2024-12-12

Page 3 of 28 ends

3 of 142

Page 104 of 132 ends
Page 108 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 4 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx Figure 2: Aerial View of Site

Project Site
Item 6
ZAB 2024-12-12

Page 4 of 28 ends

4 of 142

Page 105 of 132 ends
Page 109 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 5 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx Figure 3: Shattuck Avenue Street (East) Elevation

Item 6
ZAB 2024-12-12

Page 5 of 28 ends

5 of 142

Page 106 of 132 ends
Page 110 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 6 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx Figure 4: Bancroft Way (South) Elevation

Item 6
ZAB 2024-12-12

Page 6 of 28 ends

6 of 142

Page 107 of 132 ends
Page 111 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 7 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx Table 1: Land Use Information
Location Existing Use Zoning
District
General
Plan
Designation
Subject Property United Artists Theater (closed)
C-DMU
Corridor
Sub-Area
DT
Surrounding
Adjacent
Properties
North Government (Berkeley Public Library, Main
Branch, City Landmark) / Restaurant
C-DMU
Corridor
Sub-Area
East
Commercial (Tupper and Reed, Hezlett’s
Silk Store, City Landmarks) / Mixed-use
Commercial (retail and offices, Masonic
Temple City Landmark)
C-DMU
Outer Core
Sub-Area
Southeast Mixed-use Commercial (retail and offices,
Morse Block Building City Landmark)
C-DMU
Corridor
Sub-Area
West Government (Berkeley Public Library)
C-DMU
Buffer Sub-
Area
South
Multi-family Residential (Broad House and
Broad Apartment Building City Landmarks)/
Commercial (Corder Building City
Landmark)
C-DMU
Buffer /
Corridor
Sub-Area

Item 6
ZAB 2024-12-12

Page 7 of 28 ends

7 of 142

Page 108 of 132 ends
Page 112 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 8 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx Table 2: Special Characteristics
Characteristic Applies to
Project? Explanation
Affordable Child Care Fee &
Affordable Housing Fee for
qualifying non-residential
projects (Per Resolutions
66,618-N.S. & 66,617-N.S.)
No
These fees apply to projects with more than 7,500 square feet of net new non-residential gross floor area. The project provides no net new non-residential gross floor area.

Therefore, the project is not subject to these fees. Affordable Housing Fee for qualifying non-residential
projects (Per Resolution
66,617-N.S.)
Affordable Housing Mitigations
for rental housing projects (Per
BMC 22.20.065)
Yes
The project vested policies in place at the time of submittal of an SB 330 Preliminary Application on November 29, 2022
and is therefore subject to this section.a

To meet the requirements of BMC Section 22.20.065, the
project will include 23 Very Low-Income units. The remainder of the mitigation will be paid in fee to the Housing Trust Fund.

Prior to the finalizing the affordable unit Regulatory
Agreement (prior to Certificate of Occupancy), affordable units in the building will be designated in floor plans to ensure distribution per BMC Section 22.20.065 requirements, and additional affordable in-lieu units may be added by the applicant to reduce the fee further.

Alcohol Sales/Service No The project is not proposing any alcohol sales or service.

Bird Safe Buildings
(BMC Section 23.304.150) No
The project was vested under the Housing Crisis Act of 2019 prior to the July 27, 2023 effective date of the ordinance, and therefore these provisions do not apply.

Coast Live Oaks No There are no oak trees on the project site.

Creeks No The project site is not within a creek buffer.

Density Bonus Yes
The project would provide 23 Very Low-Income units, or 15 percent of the 151 Base Project units, and qualifies for a 50 percent density bonus, or 76 bonus units, under Government Code Section 65915. See Section III.B for discussion.

Green Building Score Yes
The project is designed to achieve a Leadership in Energy and Environmental Design (LEED) - Gold (or equivalent)
rating. The project is proposing GreenPoint Rated Silver certification, which is equivalent to LEED Gold.

Hard Hats
(BMC Chapter 13.107) No
The project was vested under the Housing Crisis Act of 2019 prior to the January 1, 2024 effective date of the ordinance, and therefore these provisions do not apply.
a
Item 6
ZAB 2024-12-12

Page 8 of 28 ends

8 of 142

Page 109 of 132 ends
Page 113 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 9 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx Characteristic Applies to
Project? Explanation
Historic Resources Yes
The project would involve the demolition of all but the front façade and lobby of the existing United Artists movie theater, which is listed in the California Register of Historical Resources. See Section IV.C for discussion of Landmarks Preservation Commission action, and Section V.A for
Environmental Review.

Housing Accountability Act
(HAA) (Gov’t Code Section
65589.5(j))
Yes
The project meets the definition of a “Housing Development Project” per Government Code Section 65589.5(h)(2).b The base project complies with applicable, objective general plan and zoning standards, and thus section (j) of the Housing Accountability Act applies, and the project cannot be denied at the density proposed unless the findings for denial can be made. See Section VI.A of this report for additional
discussion on compliance with the Housing Accountability Act.

Housing Crisis Act of 2019
(SB 330)
Yes
The project meets the definition of a “Housing Development Project” per Government Code Section 65589.5(h)(2).b See Section VI.B of this report for additional discussion on the sections of SB 330 that apply to the project.

Public Art on Private Projects
(BMC Chapter 23.316) Yes
The project is subject to the Percentage for Public Art on Private Projects Ordinance. The applicant is electing to provide pay the in-lieu fee (equal to 8% of total building permit valuation) to comply.

Rent Controlled Units No The project involves the demolition of non-residential structures and no rent-controlled units would be demolished.

Residential Preferred Parking
(RPP) No
The site is located in RPP zone “I”. The project is not eligible for RPP permits per BMC Section 14.72.080(C)(1) as no
permits shall be issued to residents in newly constructed residential units.

Seismic Hazards No
The project site is not located in an area susceptible to liquefaction, as shown on the State Seismic Hazard Zones map.c No further study is required.

Soil/Groundwater
Contamination No
The project site is located within the City’s Environmental Management Area. The project site is not listed on the
Cortese List.
d The applicant submitted a Phase I report
which found no evidence of Recognized Environmental
Conditions on the site. The applicant also submitted a Water Quality Impact Analysis, which concluded that the project would result in less than significant impacts to water quality after incorporation of the City’s Standard COAs, compliance with the federal and State regulations, and compliance with City’s plans, policies, and regulations. Standard Conditions of Approval related to hazardous materials would apply to the project.

Item 6
ZAB 2024-12-12

Page 9 of 28 ends

9 of 142

Page 110 of 132 ends
Page 114 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 10 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx Characteristic Applies to
Project? Explanation
Transit Yes
The project site is served by multiple bus lines (local, rapid, and Transbay) that operate along Shattuck Avenue, one-half block west of the site and is two blocks away from the
Downtown Berkeley Bay Area Rapid Transit (BART) Station.

Notes:
a Project vested under SB 330 on/before April 1, 2023, prior to effective date of new inclusionary housing requirements and is therefore subject to the Affordable Housing Mitigations in BMC 22.20.065 that was in effect at the time of vesting. b. Government Code Section 65589.5(h)(2) “Housing development project” means a use consisting of any of the following: (A) residential units only, (B) mixed-use developments consisting of residential and nonresidential uses in which at least two-thirds of the square footage is designated for residential use, and (C) transitional or supportive housing. c. California Department of Conservation. DOC Maps: Geologic Hazards. Available:
https://maps.conservation.ca.gov/geologichazards/
d. The Cortese List is an annually updated list of hazardous materials sites complied pursuant Government Code Section 65962.5.

Table 3: Project Chronology
Date Action
November 29, 2022
(vesting date) SB 330 Preliminary Application complete
June 2, 2023 SB 330 Use Permit Application submitted
January 4, 2024 Use Permit Application deemed complete
February 1, 2024 Demolition Referral and Landmark Initiation Meeting at LPC March 4, 2024 Assembly Bill 1633 Notice received from Applicant supporting CEQA Categorical Exemption
October 4, 2024 CEQA Categorical Exemption determination by staff – Class 32 Categorical Exemption “In-Fill Development Projects”
November 26, 2024 Public hearing notices mailed/posted
December 12, 2024 ZAB Hearing

Item 6
ZAB 2024-12-12

Page 10 of 28 ends

10 of 142

Page 111 of 132 ends
Page 115 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 11 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx Table 4: Development Standards
C-DMU Standards,
Corridor Sub-Area Existing Change Proposed Permitted/Required Lot Area (sq. ft.) 22,112 -- 22,112 n/a
Gross Floor Area (s.f.) 23,289 +190,743 214,032 n/a
Commercial Floor Area (s.f.) 23,289 -22,424 865 n/a
FAR 1 +8.7 9.7 n/a
Dwelling Units n/a +227 227 n/a
Bedrooms n/a +634 634 n/a
Building
Height1
Maximum 72’ +111’ 183’ (plus
5’ parapet)
40’ min./60’ max.
(75’ max. w/use permit,
5’ max. parapet by right)
Stories 2 +15 17 n/a
Building
Setbacks2

Front
(Shattuck) 3
0’
0’
n/a
--
--
--
0’ to 7’-1”
0’
121’-4”
0’–5’ (bldg. ht.≤20’)
0’ (bldg. ht.>20’ ≤75’)
15’ (bldg. ht.>65’)4
Front
(Bancroft)
0’
0’
n/a
--
--
n/a
0’
0’
0’
0’ (bldg. ht.≤20’)
5’ (bldg. ht.>20’ ≤75’)
15’ (bldg. ht.>75’)
Interior
Side
(north)
0’-65’
from
frontage
0’
n/a
n/a
--
n/a
n/a
0’
n/a
n/a
0’ (bldg. ht.≤75’)
5’ (bldg. ht.>75’ ≤120’)
15’ (bldg. ht.>120’)
>65’ from
frontage
0’
0’
n/a
+11’-7”
+11’-7”
n/a
11’-7”
11’-7”
11’-7”
0’ (bldg. ht.≤20’)
5’ (bldg. ht.>20’ ≤75’)
15’ (bldg. ht.>75’)
Interior
Side
(west)
0’-65’
from
frontage
0’
0’
n/a
+10’
+10’
n/a
10’
10’
10’
0’ (bldg. ht.≤75’)
5’ (bldg. ht.>75’ ≤120’)
15’ (bld1g. ht.>120’)
>65’ from
frontage
0’
0’
n/a
+10’-3”
+10’-3”
n/a
10’-3”
10’-3”
10’-3”
0’ (bldg. ht.≤20’)
5’ (bldg. ht.>20’ ≤75’)
15’ (bldg. ht.>75’)
Interior
Side
(east)
0’-65’
from
frontage
1’-3”
1’-3”
n/a
+8’-9”
+8’-9”
n/a
10’
10’
10’
0’ (bldg. ht.≤75’)
5’ (bldg. ht.>75’ ≤120’)
15’ (bld1g. ht.>120’)
>65’ from
frontage
1’-3”
1’-3”
n/a
+8’-9”
+8’-9”
n/a
10’
10’
10’
0’ (bldg. ht.≤20’)
5’ (bldg. ht.>20’ ≤75’)
15’ (bldg. ht.>75’)
1 A use permit to allow height up to 75 feet (is included in the Base Project for the calculation of the density bonus, and is not a requested waiver. Additional height beyond 75 feet is being requested as a waiver. 2 The use permit to allow modified front and side setbacks below 75 feet building height is included in the Base Project for the calculation of the density bonus, and is not a requested waiver. Setback reductions above 75’ are being requested as waivers. 3 The existing theater marquee (to be preserved) overhangs approximately 18” into the right-of-way. 4 Per BMC 23.204.130(E)(3)(d)(iv), “For lots with frontage on the Shattuck Avenue right-of-way south of Durant Avenue, a new building shall be set back 15 feet from the Shattuck Avenue property line where the building exceeds 65 feet in height”.

________ = Waiver requested to modify the district standard.

Abbreviations: s.f.= square feet; d.u.=dwelling unit; min.=minimum; max.=maximum; n/a = not applicable; % = percent; bldg. ht.=building height; ft = feet (’); in. = inches (”)

Item 6
ZAB 2024-12-12

Page 11 of 28 ends

11 of 142

Page 112 of 132 ends
Page 116 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 12 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx Table 4: Development Standards (Continued)
C-DMU Standards,
Corridor Sub-Area Existing Change Proposed Permitted/Required Building
Setbacks2
Interior
Side
(south)
0’-65’
from frontage
0’
n/a
n/a
--
n/a
n/a
0’
n/a
n/a
0’ (bldg. ht.≤75’)
5’ (bldg. ht.>75’ ≤120’)
15’ (bld1g. ht.>120’)
>65’ from
frontage
0’
0’
n/a
--
--
n/a
0’
0’
0’
0’ (bldg. ht.≤20’)
5’ (bldg. ht.>20’ ≤75’)
15’ (bldg. ht.>75’)
Diagonal Dimension
(above 120’ height) n/a n/a 178’-9” 120’ max.
(bldg. ht.>120’)
Lot Coverage (%) 94 -20 74 n/a
Usable Open Space (s.f.) n/a n/a 7,737 18,160 min.
(80 s.f./d.u.)
Privately Owned Public Open
Space (s.f.) n/a n/a 17 17 min.
(1 s.f./50 s.f. of commercial)
Parking
Commercial
(865 sq. ft.) 0 -- 1 0 min.*
Residential n/a n/a 0 0 min./114 max.
(0.5 spaces/du max.)
Carshare n/a n/a n/a n/a
Total 0 -- 1 0 min./114 max.

Bicycle
Parking
Commercial - Short
Term
(865 sq. ft.)
0 -- 2 1
(1 space/2,000 s.f. commercial)
Residential - Long
Term
(313 bedrooms)
n/a n/a 72 210 min.
(1 space/3 bedrooms)
Residential - Short
Term
(313 bedrooms)
n/a n/a 16 16 min.
(1 space/40 bedrooms, or 2)
Total 0 n/a
72/18
(long term/short
term)
210/17 min.
(long term/short term)
2 The use permit to allow modified front and side setbacks below 75 feet building height is included in the Base Project for the calculation of the density bonus, and is not a requested waiver. Setback reductions above 75’ are being requested as waivers. * Pursuant to Assembly Bill 2097, no parking is required for residential or commercial uses on a site located within ½-mile of public transit.

________ = Waiver requested to modify the district standard.

Abbreviations: s.f.= square feet; d.u.=dwelling unit; min.=minimum; max.=maximum; n/a = not applicable; % = percent; bldg. ht.=building height; ft = feet (’); in. = inches (”)

Item 6
ZAB 2024-12-12

Page 12 of 28 ends

12 of 142

Page 113 of 132 ends
Page 117 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 13 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx II. Project Setting

A. Neighborhood/Area Description: The project site is located on the west side of Shattuck Avenue and north side of Bancroft Way, within the Downtown Mixed-Use District (C-DMU), Corridor Sub-Area, as identified in the City’s Downtown Area Plan (DAP). The project site is surrounded by commercial , residential, institutional and mixed-use commercial/residential buildings ranging in height from one to five stories. Directly north is the Berkeley Public Library Main Branch, a City Landmark. Along Shattuck Avenue to the east are one - and two -story retail and restaurant uses , and a four-story, mixed commercial (retail and office) building. To the southeast , at the northeast corner of Shattuck and Bancroft is three-story, mixed commercial (retail and office) building, also known as the Morse Block Building, a City Landmark. To the west is a three-story, public library administrative building. To the south are residential buildings known as the Broad House and the Broad Apartment Building City Landmarks, Further southeast at the southwest corner of Shattuck and Bancroft, is a four-story commercial building known as the Corder Building City Landmark. (See Figure 1: Zoning Map and Figure 2: Aerial View.) The project site is served by multiple bus lines (local, rapid, and Transbay) that operate along its frontage on Shattuck Avenue, and is two blocks away from the Downtown Berkeley Bay Area Rapid Transit (BART) Station, the University of California at Berkeley Shuttle, and a bike share station at the Shattuck Avenue and Center Street intersection.

B. Site Conditions /Background: The project site is associated with the address 2274 Shattuck Avenue and Assessor’s Parcel Number 57-2028-3. The 22,112-square-foot (0.51-acre) project site is a n irregular, L -shaped parcel that has a 36-foot frontage on Shattuck Avenue and a 104-foot, 6-inch frontage on Bancroft Way. The site is occupied by a 23,289-square-foot, movie theater (United Artists (UA) Theater) that was originally constructed in 1932 and operated until its closure in February 2023. The UA Theater is listed on the California Register of Historical Resources (CRHR), and was designated a City Landmark in March 2024. (See section IV.C for discussion).

III. Project Description

A. Proposed Project Details:

The project proposes to demolish the commercial building (UA Theater) on the landmarked site, and construct a mixed-use residential building that utilizes the State Density Bonus, with the following main components:
• Preservation and renovation of the UA Theater Shattuck façade and theater lobby • 17 stories, 183 feet in height, plus 5-foot parapet
• 2 27 d
welling units – 32 studios, 49 two-bedroom, 80 two-bedroom, 66 four-bedroom • 634 bedrooms total
• 23 Very Low Income (VLI) units
Item 6
ZAB 2024-12-12

Page 13 of 28 ends

13 of 142

Page 114 of 132 ends
Page 118 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 14 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx • 7,737 square feet of usable open space – ground-floor common space, private patios, roof deck
• 72-space bike room and 18 short-term bike parking spaces • 865-square-foot, ground-floor café
B. Base Project and Density Bonus: By committing to provide 23 VLI units, the project is eligible for a density bonus under Government Code Section 65915. Under the City’s density bonus procedures, the Base Project was calculated to have 151 units, as the maximum allowable density for the site. 1 The Base Project has an average unit size of 917 square feet in a seven-story building. Twenty-three VLI units, or 15 percent of the Base Project, qualifies the project for a 50 percent density bonus or 76 bonus units. The resulting proposed project would be a 17-story building with 227 units, with an average unit size of 922 square feet (see Table 5: Density Bonus).

Table 5: Density Bonus – Government Code 65915
Base Project
Units* Qualifying Units Percent Density
Bonus
Number of
Density Bonus
Units*
Proposed
Project Units
151 23 VLI
(15 percent of BP) 50 percent 76 max.
(50 percent x 151) 227
*Per Government Code 65915(q), all unit calculations are rounded up to the nearest whole number.

IV. Community Discussion
A. Neighbor/Community Concerns: Prior to submitting the use permit application to the City on June 2, 2023, the applicant installed yellow Proposed Development Project signs at the project site.

On April 25, 2023 a virtual neighborhood outreach meeting was held by the applicant.

Eleven members of the public attended and discussed questions about the lack of affordable housing in the City and the impact of the project to the downtown area, including questions on: the preservation of the entire historic movie theater building (as opposed to only the façade and lobby) , the preservation of a downtown arts culture, the building design, construction impact, excessive building height and massing, empty storefronts, a decrease in quality of life, and inadequate parking.

Numerous letters and emails were received by staff during the application review period from individuals and organizations with concerns for the loss of the UA Theater building as a cultural and historic resource, the loss of movie theaters in the downtown, and

1 Per the City’s Density Bonus Procedures (DBP), the Base Project is the largest project allowed on the site that is fully compliant with district development standards (i.e. height, setbacks, usable open space, parking, etc.), or, the maximum allowable density for the site. The City uses the DBP to calculate the maximum allowable density for a site where there is no density standard in the zoning district, and to determine the number of units in the Proposed Project, which is the number of B ase Project units plus the number of density bonus units that can be added according to the percentage of BMR units proposed, per Government Code, §65915(f).

Item 6
ZAB 2024-12-12

Page 14 of 28 ends

14 of 142

Page 115 of 132 ends
Page 119 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 15 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx arguing for rehabilitation of the building into a live performance venue. All correspondence received by staff during project review can be found at this link:
https://aca.cityofberkeley.info/CitizenAccess/Default.aspx Click on Zoning tab; enter permit number #ZP2023-0079; click on the “Record Info” drop down menu; click on Attachments for a list of all application materials.

On November 26, 2024, the City mailed public hearing notices to property owners and occupants within 300 feet of the project site, and to interested neighborhood organizations., and to interested neighborhood organizations, and posted notices within the neighborhood in three locations. On December 2, 2024, two email correspondence and on December 4, 2024, one email correspondence was received by staff, expressing opposition to the demolition of the UA Theater and support for the rehabilitation of the building into a live performance venue.

No further communications regarding the project were received as of the writing of this staff report.

B. Design Review Committee:

This project proposes development in a non- residential zoning district; therefore, it is subject to review by Design Review Committee (DRC) pursuant to BMC Section

23.406.070(B)(1). The project was referred to the DRC f or Preliminary Design Review on November 21, 2024. The DRC provided a favorable recommendation to ZAB with the following conditions and recommendations for Final Design Review (FDR) [VOTE (6-0-0-1) Kahn: recused]:

Recommendations
• Look at color palette at FDR; look for more contrast between the theater and the tower as this may highlight the theater.
• Consider more symmetry in the tower, with additional details to add interest and some asymmetry.
• Consider more reference in the tower to the theater structure. • Look carefully at the Shattuck façade, including the blank horizontal band. • Landmark Designation ‘features to be preserved’ should guide restoration. • Consult an architectural historian to identify the original colors of the Landmark façade and consider colors that reference that palette.
• Interior of the landmarked building should be more open for more visual connection to the sidewalk.
• Consider the historic character of the interior space when finalizing the ground floor design.
• Consider an alternate location for building signage at FDR; building identification should come down to the horizontal band.
• Consider more transparency at the Shattuck entrance.
• Further develop the design of the tower façade; the shoulders, the parapet, and some wall and window ratios may need further refinement.

Item 6
ZAB 2024-12-12

Page 15 of 28 ends

15 of 142

Page 116 of 132 ends
Page 120 ends

ZONING ADJUSTMENTS BOARD 2274 SHATTUCK AVENUE
December 12, 2024 Page 16 of 28

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\Shattuck\2274\ZP2023-0079\4-REPORT DOCUMENTS [DRAFTS]\2024-12-12 ZAB\2024-12-12_ZAB_SR_2274 Shattuck.docx • Further develop the trellis design on the roof deck for shade and design consistency. • Bird-safe glazing is recommended wherever possible, but at least at upper levels. • Parking space on Bancroft is not recommended unless needed for an accessible space.
• Pollinator plants recommended at the front entry.
• Consider shading when selecting plants in the courtyard. • Recommend that the applicant work closely with the Library Staff. • Recommend that any public art be seen from the sidewalk. • Consider a larger commercial space on Shattuck, and the main residential entry being on Bancroft.
• Recommending historic plaque on the Shattuck facade, consistent with LPC direction.

C. Landmarks Preservation Commission:

The existing building , known as the United Artists Theater, was constructed in 1932. In 2004, the building was found to be eligible for the National Register of Historic Places (NAHP) through survey evaluation. In 2006, the existing building was listed in the CRHR and determined eligible for the NAHP by a consensus through the Section 106 process. In 2015, the City’s Shattuck Avenue Commercial Corridor Historic Context and Survey concluded that the subject building is located in a potential Historic District and serves as a contributor to the district .
2 Regal Cinemas, whic h inhabited the UA T heater, ceased operations in February 2023.

Because the project involves demolition of a commercial building over 40 years in age, the proposed demolition was referred to the Landmarks Preservation Commission (LPC) pursuant to BMC Section 23.326.070(C). In addition, a L andmark Initiation Application (LMIN2023-0003) was submitted on December 6, 2023. The LPC reviewed the demolition referral and the landmark initiation concurrently at a meeting on February 1, 2024.

On February 1, 2024, the LP C reviewed the demolition referral and Landmark Initiation Application and designated the building a City Landmark, with the following distinguishing features to be preserved and restored: the upper portion of the Shattuck Avenue building façade in relation to the overall height and massing of the façade, and the architectural and decorative features of the upper portion of the Shattuck Avenue building façade. The Notice of Decision (NOD) was issued and was effective on March 20, 2024.

The project’s SB 330 Preliminary Application vested the site’s historical resource status on November 29, 2022. The SB 330 Preliminary Application serves to vest for the project the policies, standards, and fees that are in effect at the time that it is complete. This includes the determination of whether the site is an historic site, which shall remain valid during the pendency of the housing development project for which the application was made. 3 The
preliminary application vested the site’s status at the time – it was not a local historic

2 The Historic District was never officially established by the City Council. 3 Pursuant to Government Code Section 65913.10(a).

Item 6
ZAB 2024-12-12

Page 16 of 28 ends
← All documents from this meeting