DATE STAMP HERE
Land Use Planning 2120 Milvia Street, Berkeley, CA 94704 Tel: 510.981.7410 TDD: 510.981.6903 Fax: 510.981.7420 Email:
Land Use Planning 2120 Milvia Street, Berkeley, CA 94704 Tel: 510.981.7410 TDD: 510.981.6903 Fax: 510.981.7420 Email: [email protected]
Project Address: ___________________________________________Zone: ___________________
Project Description: ________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________ Date Use Permit or Zoning Permit was applied for: _________________ Associated Permit number: _____________________
Property Owner Name (Print) ____________________________________________________________ Owner's Mailing Address: ________________________________________________________________ ________________________________________________________________ Daytime Phone # ___________________________________ E-mail: _____________________________ Applicant Name (Print) SAME as Above: ________________________________________________ Applicant's Mailing Address: _____________________________________________________________ _____________________________________________________________ Daytime Phone # __________________________________ E-mail: ____________________________
Under penalties of perjury, I certify that the information above and in any attachments hereto, is true and accurate to the best of my knowledge.
Applicant Signature: Date:
Owner’s Signature: Date:
Does the project include: No Yes Handout / Application Requirement
1. Demolition of, or exterior modifications to, a designated City of Berkeley landmark, structure of merit, or structure in a historic district?
Refer to the “Landmark Preservation
Commission: Structural Alteration Permit
and Design Review Submittal
Requirements”
2. Application to designate a landmark, structure of merit or historic district?
Refer to the “Landmark, Structure of Merit
or Historic District Designation Form”
Landmarks
Application Form
Effective April 3, 2013
For: ____ Alteration / Sign Permit
____ Landmark Designation
Intake Planner ____________________
X
2845 Woolsey Street
Caitlin Hibma, Left Coast Architectural History
PO Box 70415
Richmond, CA. 94807
(415) 745-1906 [email protected] n/a
n/a
12/16/2024
X
X
Application for Landmark designation.
Attachment 1, Part 3
City of Berkeley
Ordinance #4694 N.S.
LANDMARK APPLICATION
________________________________________________________________
1. Street Address 2845 Woolsey Street
City Berkeley
County Alameda
Zip 94705
2. Assessor's Parcel Number: 52-1563-15
Block and Lot: Block 1563, Lot 15
Tract: Parkside Claremont
Dimensions: 100' (southwest) x 95' (southeast) x 113' (northeast) x 99.65' (northwest) Cross Streets: Woolsey Street and Claremont Avenue
3. Is property on the State Historic Resource Inventory? No Is property on the Berkeley Urban Conservation Survey? Yes Form # 11425
4. Application for Landmark includes:
a. Building: Yes (1) Garden: No Other features: No
b. Landscape or Open Space: No
c. Historic Site: No
d. District: No
e. Other: No
5. Historic Name: F.B. Norton House
Commonly Known Name: None
6. Date of Construction: 1908
a. Factual: Yes
Source of Information: Daily Pacific Builder, 18 May 1908
7. Architects: Newsom & Newsom (Samuel, Sidney, and Noble Newsom) Architecture was the Newsom family trade, with two generations of brothers and sons collaborating on some of the Bay Area's, and California's, best know architecture of the late-19th and early-20th centuries.
The Newsom family came to Oakland from Canada in 1860; a horticultural nurseryman, his wife, and eight children. Eldest son, John, was apprenticed to an architect by 18701 and, eventually, four of the five Newsom sons gravitated toward that profession. By 1880, Thomas, Samuel, and Joseph C. Newsom were all listed as architects in census records.
None of the Newsom brothers appear to have been formally educated as architects, but gained their training through apprenticeships and from each other.
The four Newsom brothers initially worked together, but in 1878, Samuel and Joseph went out on their own, naming their practice Newsom & Newsom, which became a much better- known and widely-respected firm than that of their brothers'.2 They began in San Francisco, but by 1884, had moved their practice back to their hometown of Oakland. A few years later, they opened an office in Los Angeles and Joseph C. Newsom relocated to Southern California to lead it.
Newsom & Newsom's work initially focused on Victorian architectural styles, especially Queen Anne, and was known for being elaborately decorative, although it was primarily designed for middle-class clients. They designed around 650 buildings ranging from single- family houses to apartments and hotels. They designed the iconic Carson Mansion in Eureka, California (1884-1886), the original Berkeley City Hall (1884), the T.H. Boyd House in Eureka (1884), the 30-room Pinney House hotel in Sierra Madre (1887), and the Sessions House in Los Angeles (1888).3 A number of their works are listed on the National Register of Historic Places or otherwise designated as significant historical landmarks.
Maintaining offices at opposite ends of the state ultimately resulted in Samuel and Joseph parting ways professionally in 1888, with Joseph continuing his own solo-practice in Los Angeles. For a time, from 1889 to 1901, Samuel partnered with Frederick Herman Meyer, under the name of Newsom & Meyer. During that time, in 1893, Samuel's son Sidney joined his father's practice, becoming the second generation of Newsoms in architecture.
He was 16 years old at the time and the initial arrangement was likely an apprenticeship of sorts, as he also trained with various architecture firms on the East Coast before returning to the Newsom firm full-time.4 In 1906, after graduating from U.C. Berkeley's school of architecture, Samuel's second son, Noble Newsom, joined the firm, which had returned to being known as Newsom & Newsom.
As father and sons worked together around the turn of the twentieth century, the firm's design aesthetics evolved along with prevailing architectural fashions, away from the Victorian and toward newly popular styles like Spanish Colonial and Mediterranean Revival, French Provincial, Tudor Revival, Colonial Revival, and Craftsman. In 1905, their wildly fanciful and overstated design of Gilroy City Hall seems to illustrate this transition, while also symbolizing a “last hurrah” as they moved away from the decorative exuberance of the Victorian period and toward more quietly understated houses of high quality and 1 U.S. Federal Census, 1870.
2 Daniella Thompson, “Berkeley’s City Hall Was Inspired by a Mairie on the Loire,” http://www.berkeleyheritage.com/berkeley_landmarks/city_hall.html. 3 Pacific Coast Architecture Database (PCAD), “Newsom and Newsom, Architects,” https://digital.lib.washington.edu/architect/partners/446/. 4 David Weinstein, “Quiet Pleasures, Newsom brothers created homes with a timeless appeal,” San Francisco Chronicle, 5 February 2005.
highly-livable designs. By then, the Newsom & Newsom name had become prominent and popular. Their clients included the affluent as much as the middle-class.5 Samuel Newsom died of a coronary while onboard a ferry from San Francisco to Alameda on the first of September 1908; just three and a half months after the building contract for the house at 2845 Woolsey Street was published.6 Presumably, he never saw the finished house. Sidney and Noble continued in business without their father and Newsom & Newsom continued to be known for high-quality residential design that followed current architectural tastes, but often playfully mixed styles while using restraint in applying historical details. Later Newsom & Newsom buildings were noted to have relatively symmetrical forms and simple rooflines, lending to the sense of understated luxury that became the firm's signature aesthetic.7
In 1911, Newsom & Newsom designed the Berkeley Inn at 2501 Haste Street, a four-story brick Classical Revival building, which was damaged by fires and eventually demolished in 1990. Prior to its destruction it was the only Newsom & Newsom building to be designated as a City of Berkeley Landmark (#118).
Both Newsom brothers served in World War I, applying their building expertise in the Army Corps of Engineers. Like many other architects and builders, they brought back a new appreciation for Old World architecture that inspired further design work in European- influenced revival styles. Post-War, Archie Newsom (no relation) joined the firm as an interior architect and designer. With skyrocketing reputations, the Newsoms were in demand by clients like the Ghirardellis (of chocolate fame) and the Hills (of Hills Coffee), many of whom commissioned houses in wealthy enclaves like Piedmont. Both brothers eventually designed houses for themselves in or near Piedmont.8 Sidney was a partner in the firm until the Depression, when business slowed drastically and he retired to Walnut Creek. Noble and Archie Newsom continued the firm, designing some grand houses that belied the economic hardships of the 1930s. In 1933, Noble fractured his skull in a car accident, but survived. When World War II erupted, he joined the war effort as a designer at the Kaiser Shipyards in Richmond. During the war years, Sidney died of a stroke at the age of 65. Noble had hopes of reopening a Newsom & Newsom office in San Francisco after the war, but died only a few short days after the Kaiser Shipyards closed in 1945 and never got back to private practice. He was 58.9 The house at 2845 Woolsey Street, built in 1908, was designed during a brief period when the Newsom & Newsom firm consisted of both generations of the Newsom family (from 1893 to 1908); father Samuel, and sons Sidney and Noble. One or all three of the Newsoms may have had input in the house's design.
Other Berkeley residential buildings designed by Newsom & Newsom during that period or later (when Sidney and Noble made up the partnership, 1908 to the 1930s), include:
45 El Camino Real; 1907, First Bay Tradition
2540 (2538) Ellsworth; 1908, First Bay Tradition
2241 Parker Street; 1908, First Bay Tradition
2815 Benvenue Ave.; 1908, Craftsman Bungalow
5 David Weinstein.
6 Daily Pacific Builder, 18 May 1908.
7 David Weinstein.
8 David Weinstein.
9 David Weinstein. Pacific Coast Architecture Database (PCAD).
3121 Claremont Ave.; 1909, First Bay Tradition
20 Hillcrest Road; 1909, First Bay Tradition/Craftsman 1749 Allston Way; 1912, Craftsman
2610-1612 Parker St.; 1913, altered, possibly First Bay Tradition 3201 Claremont Ave.; 1914, Classical Revival
1924 Yosemite Road; 1916, Tudor Revival
1923 Thousand Oaks Blvd.; 1922, Classical Revival
1963 Yosemite Road; 1925, Tudor Revival, altered
38 Somerset Place; 1925, Spanish Colonial Revival
1430 Le Roy Ave.; 1928, Spanish Colonial/Monterey Colonial Revival 686 San Fernando Ave.; 1930, Tudor Revival
702 San Luis Road; 1931, style unknown10
Three of these houses were built the same year as the house at 2845 Woolsey Street and in the First Bay Tradition style, but with markedly different character. The following year and in 1914, Newsom & Newsom designed three houses within the same neighborhood as the subject house; two in a First Bay Tradition aesthetic, the latter in the Classical Revival style. This suggests that the house at 2845 Woolsey Street could have influenced some nearby neighbors to commission Newsom & Newsom for their Parkside Claremont or Uplands neighborhood homes. From 1913 onward, Newsom & Newsom's designs began a marked move away from the First Bay Tradition and Craftsman aesthetics, toward Revival styles of later popularity.
8. Builder: Henry Newton
In addition to identifying the house's architects, the Daily Pacific Builder building contract notice for the property identifies the builder; Henry Newton. The notice and a 1909 Oakland city directory indicate that Newton was based in downtown Oakland, with an office in the Bacon Building. A city directory from 1908 specifies that he was employed as the manager of the Newton-Sanford Construction Company. No census records or other vital information were found to provide a biographical account of Newton.
Around the time that he was building the house at 2845 Woolsey Street, the Daily Pacific Builder notes a few other projects that the Newton-Sanford Construction Company completed, including two four- and five-room bungalows in Berkeley (10 January 1907); a 24 bungalow tract in Fruitvale (11 April 1908); and a two-story mixed use building containing three shops and 15-room flats on San Pablo Avenue in Oakland (1 June 1908).
In February 1908, they built a house at 81 Hillcrest Road, nearby the subject house.
9. Style: First Bay Tradition
Stylistically, the house at 2845 Woolsey Street can be classified as First Bay Tradition. The 10 This list represents a sampling of properties designed by Newsom & Newsom, as identified on Berkeley Architectural Heritage's “41 Walking Tours” (2009) index; https://berkeleyheritage.com/docs/41_Walking_Tours.index.pdf Other Newsom & Newsom designs likely exist in Berkeley beyond what is listed here.
Bay Tradition was an ongoing regional architectural trend spanning from around 1880 through the 1960s, and was the only dominant regional style of architecture to emerge in the San Francisco Bay Area. Buildings of the Bay Tradition can be classified within three different periods, but the designs of each period tended to perpetuate the common characteristics of modest, straightforward, distinctive design that responded to the Bay Area's climate, geography, and relatively informal cultural attitudes. The First Bay Tradition style was a derivation of the East Coast's Shingle style, while the Second Bay Tradition style was inspired by the International and Ranch styles, and the Third Bay Tradition style was a synthesis of the earlier two that combined rustic materials with strikingly modern forms. The stylistic trend as a whole was noted and perpetuated by publications of the day, such as Architect and Engineer, Sunset magazine, California's Arts & Architecture, Magazine of Art, and Pencil Points.11
The First Bay Tradition style was popular around the turn of the twentieth century, between about 1880 and 1917. “The houses of the Eastern Shingle Style with their large living areas and wide openings between rooms, when mixed with the Craftsmen [sic], Swiss Chalet, some Queen Anne and Art Nouveau Styles with a Japanese influence in detailing, formed the basis of the work of early practitioners in the San Francisco Bay region.” 12 Bay Area architects such as Ernest Coxhead, Willis Polk, John Galen Howard, Bernard Maybeck, and Julia Morgan were known for honing the style. The aesthetic is in great evidence and beloved in Berkeley, where it is commonly referred to using the “brown shingle” moniker, which simply referenced the often unpainted wood shingle cladding, although painted shingle can also qualify for the First Bay Tradition classification. Houses of the First Bay Tradition style are characterized by:
Tall narrow profiles of 2-3 stories
Asymmetrical plans and facade organization that includes projecting and recessed bays and porches
Prominent porches
Steeply pitched roofs with gable and gambrel forms, often with cross-gables and dormers Wood windows with small divided lights and double-hung or casement sashes Wood shingle cladding, sometimes incorporating wavy patterns or diamonds Wall planes that flare and/or overhang at the bottom, especially between stories; or that bulge or bow above windows
Tall, prominent brick chimneys and other brick elements; brick is often of the clinker variety Ornamentation that tends toward the Classical or Gothic, applied in an eclectic way that referenced no style directly but created an overarching historical sense At 2845 Woolsey Street, the house's mixture of shingled aesthetics dating to 1908, places it within the appropriate time period and stylistic genres to be considered First Bay Tradition. As is said of Bay Tradition buildings of all sub-types, “although they have certain common characteristics... every good Bay Region house is unique in design. This is because each one, unlike most U.S. homes, represents a tailor-made solution to the particular living problems of the owner.”13 Therefore, a wide range of aesthetic influences are typically present in Bay Tradition buildings and can account for the subject house's mixture of Shingle, Craftsman, Tudor, Classical Revival, American Four Square, even 11 San Francisco Planning Department, San Francisco Modern Architecture and Landscape Design, 1935-1970, Context Statement (2010)
12 Lester Walker, American Shelter (New York: Overlook Press, 1996) 192. 13 “San Francisco Houses: They embody a new U.S. Regional architecture,” Life Magazine, 5 September 1949.
Prairie styles, all of which amount to an eclectic and unique First Bay Tradition design that Newsom & Newsom likely crafted with strong input of the Norton family who would live in it.
The form of the house differs somewhat from the identified tall narrow profile, but does not detract substantially from the overall aesthetic. It is two stories high and has a regular, rectangular plan that results in a less asymmetrical plan and less articulated facades. The more boxy massing can be attributed to Classical and American Four Square influences, however. Projecting bays, bay windows, the (original but currently not-extant) recessed second story balcony/porch at the northeast corner, and the main entry porch all lend to subtle articulations that are typical to the First Bay Tradition style. The entry porch's prominent and obvious visual indication of a formal entrance to the house is also characteristically First Bay Tradition.
The hip roof, though relatively shallowly pitched, has distinctly flared eaves that make strong reference to the Japanese influences described, and the prominent, decoratively shaped, exposed rafter tails at the eaves are either – or both – distinctly Craftsman and referential to Classical modillions, as are the projecting shaped beam ends between stories.
Most of the current windows are not original, but maintain a double-hung configuration typical of the style. Original windows are known to have been multi-lite-over-one double hung sashes with vertical muntins, extremely appropriate to the First Bay Tradition style.
Also extremely appropriate to the aesthetic is the three-part, diamond pattern, leaded glass feature window on the rear (west) facade that relates to the interior stair.
Of course, the house's wood shingle siding is a strong indicator its First Bay Tradition identity, and includes the characteristic flared shingle-work at the base of the second story walls. Other typical ornamental elements include traditional wood moldings; pronounced trim around openings, especially with prominent hoods and projecting sills; decorative flower boxes, which were an often-borrowed signature of Maybeck's work; and original but no longer extant Classical balustrades and diamond pattern railings at the porch. A clinker brick chimney is also present, tall and slender, and although placed less prominently on the rear facade, is quite visible from the street.
10. Original Owners: F.B. Norton
Original Use: Single-family residence
11. Present Owners: Michael A. Pearson & Annette Blum
12. Present Use: Single-family residence
Current Zoning: R-2
Adjacent Property Zoning: C-N (to northeast), and R-2 (to northwest, west, and southwest), RH-1 (across Claremont Ave. to east)
13. Present Condition of Property:
Exterior: Good
Interior: Good
Grounds: Good
Has the property's exterior been altered? Yes
Building permit records indicate the following exterior alterations:
Date Permit # Description of Work/Notes
10/10/1945 57983 Reroof entire house with composition shingles. 12/31/1958 85721 Replace front steps (4) with brick steps on 8” slab. [Altered again at a later date; steps now concrete and
located on east side of porch.]
1/22/1969 113371 Add new stairway and exit door, close front porch. [Stairway and exit may refer to western portion of
northern addition.]
5/30/1973 ID# 053073839 Deck addition for exiting door, 6 x 14. [Located at second story, east side of north facade; associated with the two- story addition already located on west side of north
facade. All since removed.]
12/30/1980 0130807340/
UP# 9109
Close in porch.
7/20/1987 720874645 Repair rear stairway.
11/30/2000 00-00005015 Reroof with composition shingle. 7/14/2021 B2021-03100 Removal of dry-rot shingles, installation of vapor barrier, and installation of new cedar shingles.
12/1/2021 B2021-04972 Dry rot repair. Roofing repair, shingles, and chimney removal. [Main chimney remains, may have referred to a
secondary kitchen chimney.]
1/04/2022 B2022-00014 Replace windows in like kind (26). [Current vinyl sash] Other substantial alterations that have been observed, but which are not reflected or fully elaborated upon by above records, include:
The house originally had an integral open balcony at the northeast corner of second story. At some point, a large opening related to the balcony, at the right side of the second story of the primary facade, was fitted with an aluminum sliding sash window.
Openings on the left side of north facade were also altered by an addition to the north facade. In 2021-2022, the opening on the primary facade was infilled entirely. A shallow, shed-roofed, two-story addition with a substantial exterior stair, was made to the north facade, possibly in 1969. In 1973, an additional deck was added to the east side of the addition, which itself was, or became, enclosed. The entire addition was
removed in 2021-2022, but all fenestration on the north facade remains altered and non-original.
The front porch was originally open with brick entry steps oriented toward Woolsey Street to the south. There were three thick square porch posts along the east side and the railings in between were Classical balustrades. A diamond-patterned railing surrounded the roof deck. The porch was later enclosed, in 1969 and/or 1980, new brick steps and an exterior door were installed on the south side, while the rest was enclosed with glazing. The roof deck railing remained. In 2021-2022, the porch was reopened, but oriented to the east. Three original porch posts were replaced with four of somewhat smaller dimension, while concrete steps, non-original railings, interior finishing, and a new entry door were added (original leaded glass sidelights appear to remain). The roof deck railing was removed and the integral hip roof over the projecting bay to the right of the porch appears to have been extended across the width of the porch. Structural beams may have been altered, as the porch roof now exhibits a distinct slope to one side.
14. Description:
The parcel and house are oriented on a diagonal axis, with Woolsey Street to the southwest and Claremont Avenue to the southeast. For the purposes of this report, the primary facade, which faces Claremont Avenue will be referred to as facing east, the rear facade facing west, etc.
Site
The property is located in a densely developed residential setting of large-scale houses, with a row of commercial buildings located to the immediate north, along Claremont Avenue. It is set in close proximity to neighboring buildings on an almost square lot, measuring 100 feet along Woolsey Street and 95 feet along Claremont Avenue. The lot is flat and elevated slightly above street level, with a cast stone site wall bordering it on the south and east. The house is set back from Claremont Avenue with a large front yard, and sits very close to the western lot line, resulting in no rear yard. Narrow margins exist between the house and the north and south lot lines. The lot is landscaped with hardscaping and small plantings. Four mature trees stand at the eastern edge of the lot, while others surround the house but are not located on the property, itself.
House
The house has a rectangular plan, sits on a concrete foundation, is two stories high, and topped by a hip roof. The roof is clad with composition shingle and features broad flared eaves with closely-spaced, decoratively shaped rafter tails on all sides. Exterior wall cladding is wood shingle that flares out at the base of the second story wall, creating a small overhang that is ornamented with a horizontal wood molding and/or block modillions in most locations. Current fenestration consists of vinyl-sash, double-hung windows with vertical faux muntins in the upper sashes. Most windows and other openings have wide flat wood trim, projecting sills, and simply molded hoods.
The primary facade faces east toward Claremont Avenue and represents the long side of the house's rectangular plan. It features an entry porch to the left of center and a projecting bay to its immediate right. Both are topped by an intermediate hip roof with slightly flaring eaves, while a flat roof projects to cover the balance of the porch. The porch is accessed from the east by concrete steps. It has a shingled base, metal railings with solid shingled
railings at the sides, and thick square wood posts that support the flat roof that extends from the intermediate hip roof. The flat porch roof features decorative rafter tails with shaped ends, supported in turn by cross beams with shaped ends. Within the porch, the ceiling, back wall, and interior of the solid side railings are clad with simple wood paneling and battens. The entry door is paneled and has a leaded glass oval window at its center. It is flanked by partial height, diamond-pattern, leaded glass sidelights. The projecting bay to the right of the porch features a three-part window, with a narrow middle sash flanked by wider sashes, all separated by wood mullions. Standard windows are located at the far left and right sides of the facade and at the second story level, where a three-part window (wide sash flanked by narrower sashes) is flanked by single windows. These three openings are regularly spaced from one another, but set off-center to the left, leaving a blank wall plane at the far right side of the second story.
The south facade, facing Woolsey Street, represents the short side of the rectangular plan.
It features a shallow projecting square bay fenestrated with a pair of standard windows at the far left side, while a shallow angled bay window with three standard sashes is located on the right side. Two symmetrically placed standard windows at the second story have decorative paneled wood flower boxes beneath that are supported by projecting beams and short cross beams.
The north facade also represents the short side of the rectangular plan and faces a small side yard and neighboring property. It features two fully-glazed wood doors spaced widely at the first story. At the second story there is one large window on the right side that has a single-lite, fixed sash.
The east facade represents the long side of the rectangular plan and faces a narrow passage between the house and the neighboring property. There are three irregularly placed windows on the first story, one of which has a sliding aluminum sash. The second story features a shallow, flat topped, projecting rectangular bay that is located to the right of center. The bay is supported by decoratively shaped projecting beam ends and is fenestrated with a large three-part window that has diamond-pattern leaded glass.
Elsewhere on the second story are three standard windows. A narrow clinker brick chimney rises up the right side of the facade and projects through the eaves to rise above the roofline.
15. History:
The first owners and residents of the house at 2845 Woolsey Street were the Frank Butler Norton family. Frank Norton was born in Martha's Vineyard, Massachusetts, in 1849, the son of a New Bedford whaling ship captain. In 1870, he went west to San Francisco at the age of 21, where he found work as a bookkeeper in the offices of a provisions wholesaler.
By 1884, he had started his own provisions wholesale business and had a number of partners over the years, until the the firm finally became known as Norton, Teller & Company. The company sold wholesale produce, meat, and dairy products and acted as a commission merchant, selling goods for other purveyors. Its offices were in San Francisco.14
In July 1877, Frank married Eliza J. Mayhew in Santa Barbara.15 They had three children:
Mayhew, Frances Amelia, and Charles Worth. Eliza died in 1886 at the age of 31, and the 14 “F.B. Norton, Pioneer, Dies,” San Francisco Examiner, 9 December 1931. San Francisco city directories. 15 Ancestry.com; California, U.S., County Birth, Marriage, and Death Records, 1849-1980.
following year Frank remarried. His second wife was Cora B. Wightman of Sonoma.16 Cora was born in Plainfield, Illinois in 1862 and grew up in Sebastapol, where her father was a bank president. The couple had three children of their own: May Elizabeth, Frank B. Jr., and William Wightman (often known as Wightman). Frank's three oldest children were grown and living on their own by the time that Frank and Cora built and moved into the house on Woolsey Street. Prior to living at 2845 Woolsey Street, the family had lived only a few blocks from the subject property, at 6441 Benvenue Avenue and had addresses in Oakland and San Francisco prior to that.17
In 1908, the Nortons commissioned the architecture firm of Newsom & Newsom to design a handsome residence for them at 2845 Woolsey Street. Living nearby on Benvenue Avenue likely lead to their purchase of the large empty parcel at the corner of Claremont Avenue and Woolsey Street. There appears to be no documentation of how or why the Nortons came to select the Newsoms' firm or any of the client-architect interactions that likely went into the design of the house. An article and illustration (see attached) ran in the 19 April 1908 edition of the Oakland Tribune, however; which reported on F.B. Norton “putting up a pretty house.” The article noted that the “home will be roomy and have all the latest improvements.” It went on to say:
F.B. Norton, of Norton & Teller Co., San Francisco, is building a two-story residence... It is to be located on the north side of Woolsey Street, sixty feet west of Claremont avenue, Berkeley. Newsom & Newsom, 526 Larkin Street, San Francisco, are the architects. The house will cost about $6,000, complete.
The feature of the exterior will be heavy beam work on the front porch and cornice. The house is to be shingled. The living-room and library will face the south and are to be paneled with burnt board and batten. A large open fireplace is in the library. The vestibule and dining-room are to have heavily beamed ceilings. A large kitchen, pass pantry, laundry and servant's room are in the rear.
On the second story are five large sunny bedrooms, all having large closets. There are also linen closets and cases which are always needed.
Facing the north is a balcony, commanding and excellent view of the Berkeley hills.
Two years after the house was built, the 1910 federal census recorded the Nortons at 2827 Woolsey Street, as the property was originally addressed. Frank was 61 and employed as a commission merchant. Cora was 48, and their three children – Wightman, May, and Frank Jr. – lived at home. Their ages ranged from 12 to 22. Wightman was old enough to work and was employed as a commission merchant, likely by his father's firm. The family employed Mary Anderson, a 40 year old household servant from Sweden, although in late 1911, numerous want ads for a new “girl for general housework,” ran in the newspaper.18 Ten years later, in 1920, the occupancy of 2845 Woolsey Street (then still 2827) was much the same. Wightman had married and moved away from home, but May and Frank Jr. remained. Both in their early 20s, May worked as a school teacher, while Frank was not 16 Ancestry.com; U.S. Select Marriages, 1850-1945.
17 Oakland city directory, 1908.
18 Berkeley Daily Gazette, October 1911.
employed. The Norton's household servant was Nellie Haupt, a 40 year old woman from California.
In 1930, the address of the house remained 2827 Woolsey Street on census records, and the property was valued at $20,000 (about $380,000 today). Frank Norton, at age 81, was retired. Cora was 63. The Norton's three children still lived at home or had returned.
Wightman, age 41, had divorced and moved back home. He worked as a distributing agent for a furnace manufacturer. May, 31, remained unmarried and continued to work as a public school teacher. Frank Jr., 30, was also unmarried and was a dentist in general practice. The family employed Marie Moen, a 19 year old servant from Norway.
Frank Norton died in 1931. His obituary noted that he had retired several years before his death, but at one time had served as president of the San Francisco Dairy Exchange. In his personal time, he was active in the Alameda County Sportsmen's Club, the oldest duck hunting club in the West, and was a member of the Sons of the American Revolution.19
In the late 1930s, address renumbering occurred in the neighborhood and 2845 Woolsey Street was finally assigned its current address. In 1940, the house was occupied by Cora, then a 77 year old widow. Daughter May, who never married, lived with her. She was 40 and employed as a kindergarten teacher. The census also shows that Wightman Norton had remarried and lived next door with his wife, Violet, and daughter, Nancy. The Wightman Norton house (presumably built 193720) was located to the rear (northwest) of 2845 Woolsey Street and had been assigned the subject house's old address, 2827 Woolsey Street. The Nortons also appear to have owned the house at 2823-2825 Woolsey Street (now 2823 Woolsey Street), which was a duplex that they rented out.21 In August 1944 a one-alarm fire was reported at 2845 Woolsey Street. It was caused by an electric heater and caused $100 in damages.22
Cora Norton died in February 1950 at age 90. Later the same year, the census indicates that May Norton was living at the subject house by herself, still working as a public school kindergarten teacher. Her brother and sister-in-law continued to live next door and eventually had three children.
Around 1951, May Norton moved to 2844 Woolsey Street, directly across Woolsey Street from the subject property. The details of her move are unclear, but Planning Department records indicate that she petitioned to have the zoning of the subject house changed a couple of times without success. As early as November 1950, Rhoda Nichols, a playground director for Berkeley city schools, and very likely a professional acquaintance of May's, was associated with the rezoning attempts and change of use converting property to a nursery school. It may be that May Norton's professional interests as a kindergarten teacher led her to devote her family home to become a nursery school, with her associate Rhoda Nichols heading the establishment. May Norton died shortly thereafter, in 1953. She was 59 years old and succumbed to a month-long illness in an Oakland hospital.23 Ownership of the house presumably passed to Luther and Rhoda 19 “F.B. Norton, Pioneer, Dies,” San Francisco Examiner, 9 December 1931. 20 Alameda County Assessor.
21 “Houses for Rent,” Berkeley Daily Gazette, 2 May 1936. 22 “Heater fire causes $100 damage here,” Berkeley Daily Gazette, 2 August 1944. 23 “May E. Norton” (obituary), Berkeley Gazette, 24 August 1953.
Nichols around this time.
In 1952, use permit records indicate that Rhoda Nichols was granted the change-of-use for the property and permission to create a playground area in the front yard. Later records indicate that part of the house was retained as the Nichols' residence; occupied by Rhoda, her husband Luther, and at some point her elderly father. Rhoda Nichols grew up in Petaluma and attended U.C. Berkeley. Luther had grown up in Berkeley and also attended U.C. Berkeley, then went to work as a newspaper reporter for the San Francisco Chronicle.
The couple were married in 1950.24
On 16 December 1952, an announcement ran in the Berkeley Daily Gazette that the Rhoda Reed Nichols Nursery School, located on Prince Street, had moved around the corner to 3090 Claremont Avenue (an alternate address for 2845 Woolsey Street) and would be known as the Claremont Day Nursery. It was noted that “the lovely garden is much larger and the play area inside and out, is more spacious.” It has “pleasant surroundings and thoroughly trained and experienced supervision.” By 1958, Rhoda Nichols had opened another branch of the Claremont Day Nursery at 5830 College Avenue, and in 1962, she opened yet another at 912 Ensenada Avenue.
Rhoda Nichols owned the property and ran the nursery school until 1976, when both the property and the nursery school business were sold to Tom and Frances Morabito. Tom Morabito was a teacher, who worked in private and public schools prior to taking over the Claremont Day Nurseries.25 Around 2021, due to failing health, the Morabitos decided to close the nursery school. At that time, they remodeled the house prior to selling it, which resulted in a number of the recent changes noted under item 17, above. In June 2022, the property was sold to the current owners, Michael A. and Annette Pearson, who will return it to single-family residential use and wish to reverse a number of the earlier incompatible alterations.
Chain of Title
Dates Owners Occupants
1908 – 1950 Frank B. & Cora Norton Norton family
1950 – ca.1952 Mary Elizabeth Norton Mary Elizabeth Norton ca.1952 – 1976 Luther & Rhoda Nichols Nichols family
Claremont Day Nursery
1976 – 2022 Tom & Frances Morabito Claremont Day Nursery 2022 - present Michael A. & Annette Pearson Michael A. & Annette Pearson 24 “Marriage of Rhoda Reed to Berkeley man is announced,” Petaluma Argus Courier, 13 February 1950. 25 “Owner to close beloved day care schools because of failing health,” Berkeleyside, 28 June 2021; https://www.berkeleyside.org/2021/06/28/tom-morabito-owner-child-care-claremont-day-nurseries-to-close
16. Significance:
Historic Value: City and neighborhood
Architectural Value: City and neighborhood
The property at 2845 Woolsey Street is eligible for designation as a Berkeley Landmark; meeting Landmark criteria 1B and 1C in relation to its architectural merit.26 The following provides an evaluation of the significance of 2845 Woolsey Street.
In accordance with Landmark criterion 1B, 2845 Woolsey Street is an outstanding example of early-twentieth century residential architecture in the First Bay Tradition style and is a notable example of design by the renowned Bay Area architecture firm of Newsom & Newsom.
The house presents a unique and complexly crafted example of the First Bay Tradition style. The style has certain typical traits (especially wood shingle exterior cladding), but is intrinsically varied in individual design and stylistic influence, often responding to customization for the specific homeowner-client and resulting an eclectic presentation of form and ornament. The house at 2845 Woolsey Street is most strongly identified as First Bay Tradition by its wood shingle cladding and Classical Revival ornamentation; however ornamentation and other features also hint at Craftsman, Tudor Revival, American Four Square, and Prairie aesthetics, and even some Japanese influence. The mixture of popular styles of the day and their amalgam into a completely unique iteration of the locally significant First Bay Tradition style makes 2845 Woolsey Street a significant example of the style. The deft adaptation of the style by architects Newsom & Newsom, presumably with the input of the Norton family who commissioned the house, makes it a prime example not only of the style but the way the style was made unique to every project.
The firm of Newsom & Newsom consisted of two generations of the Newsom family and, as it was built in 1908, 2845 Woolsey Street falls within the brief period when both Samuel Newsom and his two sons were designing together. A transitional period in the firm's history, this was also a time when the firm's design aesthetics shifted with prevailing architectural fashions, away from the exuberant Victorian and toward newly popular styles that included the increasingly popular First Bay Tradition style and its many eclectic aesthetic influences. The house at 2845 Woolsey Street showcases the evolution that the Newsoms' work took toward more quietly understated houses of high quality and highly- livable designs during this period. While the Newsoms worked throughout the Bay Area, their most recognized work is primarily found in San Francisco and Piedmont. They were active in Berkeley, however; and a selection of their residential designs illustrate both the progression of their stylistic aesthetics and their work in particular areas of the city as they became known and presumably referred among clients. The house at 2845 Woolsey Street represents a time during the first decade of the twentieth century when the Newsoms adhered strongly to the First Bay Tradition style, while making each house unique. It stands out from their earlier houses of the style in having more Classical overtones and influences from a wide variety of other styles, perhaps indicating the shift the Newsoms would make toward later Revivial styles. It was also the first of three Newsom & Newsom projects in the Parkside Claremont and Uplands neighborhood, suggesting that the firm may have been introduced to the area with their work at 2845 Woolsey Street and then 26 City of Berkeley Municipal Code, Chapter 3.24.110, Landmarks, historic districts and structures of merit – Designation – Criteria for consideration.
were eagerly hired by nearby neighbors.
In accordance with Landmark criteria 1C, the house at 2845 Woolsey Street is worth recognizing and preserving for its exceptional contribution to the historic and aesthetic fabric of the Parkside Claremont neighborhood. The house is sited on a prominent corner, at the intersection of Woolsey Street and Claremont Avenue; surrounded by other architecturally interesting houses, adjacent to a bustling neighborhood commercial row, and opposite the entrance to the Uplands neighborhood which is enhanced by historic stone pillars and transit shelters, creating a rich surrounding built-environment. The house is a highly visible and noteworthy element of a residential neighborhood that has many good and varied examples of early-twentieth century architecture, including similar, but always unique, examples of what is colloquially and fondly referred to as Berkeley's “brown shingle” architecture (i.e. the First Bay Tradition style identified by its ubiquitous siding material). The house represents the First Bay Tradition style, designed by renowned architects, that contributes strongly to both the visual and historical context of the area.
17. Is the property endangered?
No. On the contrary, Landmark designation will make the property eligible for Mills Act benefits that will facilitate rehabilitation and restoration of the house, including the reversal of a number of previous inappropriate alterations.
18. Photographs:
Date: 7 November 2024
Repository: Left Coast Architectural History
Photographer: Caitlin Hibma, Left Coast Architectural History
19. Bibliography/Sources:
Alameda County Assessor.
Ancestry.com; federal census and other vital records.
Berkeley Architectural Heritage Assoc., “41 Walking Tours” (2009) index; https://berkeleyheritage.com/docs/41_Walking_Tours.index.pdf Berkeleyside, 28 June 2021.
City of Berkeley, Municipal Code, Chapter 3.24.110.
City of Berkeley, Planning & Development Department; building permit and planning records.
Daily Pacific Builder.
Historical Information Gatherers, Fire Insurance Maps online (FIMo) .
Life Magazine, 5 September 1949.
NewspaperArchive.com
Newspapers.com
Pacific Coast Architecture Database (PCAD). “Newsom and Newsom, Architects,” https://digital.lib.washington.edu/architect/partners/446/.
San Francisco Planning Department, “San Francisco Modern Architecture and Landscape Design, 1935-1970, Context Statement,” 2010.
Thompson, Daniella. “Berkeley’s City Hall Was Inspired by a Mairie on the Loire,” http://www.berkeleyheritage.com/berkeley_landmarks/city_hall.html.
University of California Riverside, California Digital Newspaper Collection.
University of California Santa Barbara, Library Geospatial Collection.
Walker, Lester. American Shelter. New York: Overlook Press, 1996.
Weinstein, David. “Quiet Pleasures, Newsom brothers created homes with a timeless appeal,” San Francisco Chronicle, 5 February 2005.
20. Recorder: Caitlin Hibma
Date: 12 December 2024
Organization: Left Coast Architectural History
Historical Images
Illustration of F.B. Norton House, 1908. (Oakland Tribune, 19 April 1908.) Interior of 2845 Woolsey Street, 1908; library looking (north) into dining room. (Berkeley Architectural History Assoc.)
Interior of 2845 Woolsey Street, 1908; library looking northwest into stair hall. (Berkeley Architectural Heritage Assoc.)
Sanborn Fire Insurance map, 1911. Subject property outlined in red. (Historical Information Gatherers)
Aerial photograph, 1931. Subject property circled in red. (UCSB Library)
Aerial photograph, 1946. Subject property circled in red. (UCSB Library)
Sanborn Fire Insurance map, 1950. Subject property outlined in red. (Historical Information Gatherers)
View of Woolsey Street (south) facade; 1950s.
(Berkeley Architectural Heritage Assoc., Donough Collection)
Aerial photograph, 1965. Subject property circled in red. (UCSB Library)
View of Woolsey Street (south) facade; recent nursery school era, 2000s. (Berkeley Architectural Heritage Assoc.)
2845 Woolsey St. south and east facades, looking northwest from Woolsey St., ca. 2014.
Note original windows and enclosed porch with upper railing intact. (Google Streetview)
2845 Woolsey St. south facade, looking north from Woolsey St., ca. 2014.
Note original windows and enclosed porch with upper railing intact. (Google Streetview)
2845 Woolsey St. south and east facades, looking northwest from Woolsey St., ca. 2014.
Note original balcony opening (glazed) and later northern addition at right side of second story. (Google Streetview)
Current Images
View of primary (east) facade from Claremont Avenue, looking west.
View of south and primary (east) facades from Woolsey Street, looking northwest.
View of rear (west) and south facades from Woolsey Street, looking northeast.
View of primary (east) facade from front of property, looking west.
Detail of entry porch, primary (east) facade, looking west.
View of south facade from Woolsey Street, looking north.
View of primary (east) and north facade from yard, looking southwest.
View of north side of rear (west) facade, looking north.
View along rear facade from southwest corner of house, looking north.
Detail of upper south facade, showing flower boxes, looking northwest.
Detail of eaves, southeast corner of house.
Detail of cast stone site wall along south and east sides of property; near corner, looking northwest.
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager
INFORMATION CALENDAR
June 17, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Jordan Klein, Director, Planning and Development Department Subject: Landmarks Preservation Ordinance Notice of Decision: 1947 Center Street/#LMSAP2025-0007
INTRODUCTION
The attached Landmarks Preservation Commission Notice of Decision (NOD) is presented to the Mayor and City Council pursuant to Berkeley Municipal Code/Landmarks Preservation Ordinance (BMC/LPO) Section 3.24.240.A, which requires that “a copy of the Notice of Decision shall be filed with the City Clerk and the City Clerk shall present said copy to the City Council at its next regular meeting.”
CURRENT SITUATION AND ITS EFFECTS
The Landmarks Preservation Commission (LPC/Commission) has approved a Structural Alteration Permit (SAP) for the subject National Landmark property. This action is subject to a 15-day appeal period, which began on June 3, 2025.
BACKGROUND
BMC/LPO Section 3.24.300 allows City Council to review any action of the Landmarks Preservation Commission in granting or denying a Structural Alteration Permit. For Council to review the decision on its merits, Council must appeal the Notice of Decision.
To do so, a Council member must move this Information Item to Action and then move to set the matter for hearing on its own. Such action must be taken within 15 days of the mailing of the Notice of Decision, or by June 17, 2025. Such certification to Council shall stay all proceedings in the same manner as the filing of an appeal.
If the Council chooses to appeal the action of the Commission, then a public hearing will be set. The Council must then rule on the designation within 30 days of closing the hearing, otherwise the decision of the Commission is automatically deemed affirmed.
Unless the Council wishes to review the determination of the Commission and make its own decision, the attached NOD is deemed received and filed.
LPO NOD: 1947 Center Street/#LMSAP2025-0007 INFORMATION CALENDAR June 17, 2025
ENVIRONMENTAL SUSTAINABILITY & CLIMATE IMPACTS
Landmark designation and discretionary alteration reviews by staff and LPC provide opportunities for the adaptive re-use and rehabilitation of historic resources within the City. The rehabilitation of these resources, rather than their removal, achieves construction and demolition waste diversion, and promotes investment in existing urban centers.
POSSIBLE FUTURE ACTION
The Council may choose to appeal the decision, in which case it would conduct a public hearing at a future date.
FISCAL IMPACTS OF POSSIBLE FUTURE ACTION
There are no known fiscal impacts associated with this action.
CONTACT PERSON
Joshua Muller, Associate Planner, Planning and Development, 510-981-7488 Attachments:
1: Notice of Decision – #LMSAP2025-0007/1947 Center Street
Attachment 1, part 1
L A N D M A R K S
P R E S E R V A T I O N
C O M M I S S I O N
N o t i c e o f D e c i s i o n
DATE OF BOARD DECISION: May 1, 2025
DATE NOTICE MAILED: June 2, 2025
APPEAL PERIOD EXPIRATION: June 17, 2025
EFFECTIVE DATE (Barring Appeal or Certification): June 18, 20251 1947 Center Street – The Former State Farm
Insurance Company Building
Structural Alteration Permit #LMSAP2024-0007 to replace windows at a National Landmark property.
The Landmarks Preservation Commission of the City of Berkeley, after conducting a public hearing, APPROVED the Structural Alteration Permit request. Applicant Uriel Gonzalez, City of Berkeley
1947 Center Street
Berkeley, CA 94704
Property Owner City of Berkeley
2180 Milvia Street
Berkeley, CA 94704
ZONING DISTRICT: Downtown Mixed-Use District (C-DMU Buffer) ENVIRONMENTAL REVIEW STATUS: The project is categorically exempt from further environmental review in accordance with CEQA Guidelines Section 15331 for Historical Resource Restoration/Rehabilitation.
1 Pursuant to BMC Chapter 3.24, the City Council may “certify” any decision of the LPC for review, which has the same effect as an appeal. In most cases, the Council must certify the LPC decision during the 14-day appeal period. However, pursuant to BMC Section 1.04.070, if any portion of the appeal period falls within a Council recess, the deadline for Council certification is suspended until the first Council meeting after the recess, plus the number of days of the appeal period that occurred during the recess, minus one day. If there is no appeal or certification, the Use Permit becomes effective the day after the certification deadline has passed.
LANDMARKS PRESERVATION COMMISSION
NOTICE OF DECISION
#LMSAP2025-007
1947 Center Street
Mailed: June 2, 2025
The application materials for this project is available online at:
https://berkeleyca.gov/construction-development/land-use-development/zoning-projects or https://permits.cityofberkeley.info/CitizenAccess/Default.aspx
FINDINGS AND CONDITIONS OF APPROVAL AND APPROVED PLANS ARE ATTACHED
TO THIS NOTICE
COMMISSION VOTE: 5-0-0-3
YES: ENCHILL, CRANDALL, SCHWARTZ, FINACOM, HALL-MONTGOMERY NO: NONE
ABSTAIN: NONE
ABSENT: PLESE, ORBUCH, LEUSCHNER
TO APPEAL THIS DECISION (see Section 3.24.300 of the Berkeley Municipal Code):
To appeal a decision of the Landmarks Preservation Commission to the City Council you must:
1. Submit a letter clearly and concisely setting forth the grounds for the appeal to the City Clerk, located at 2180 Milvia Street, 1st Floor, Berkeley. The City Clerk’s telephone number is (510) 981-6900.
a. Pursuant to BMC Section 3.24.300.A, an appeal may be taken to the City Council by the application of the owners of the property or their authorized agents, or by the application of at least fifty residents of the City aggrieved or affected by any determination of the commission made under the provisions of Chapter 3.24.
2. Submit the required fee (checks and money orders must be payable to ‘City of Berkeley’):
a. The basic fee for persons other than the applicant is $1,500. This fee may be reduced to $500 if the appeal is signed by persons who lease or own at least 50 percent of the parcels or dwelling units within 300 feet of the project site, or at least 25 such persons (not including dependent children), whichever is less. Signatures collected per the filing requirement in BMC Section 3.24.300.A may be counted towards qualifying for the reduced fee, so long as the signers are qualified. The individual filing the appeal must clearly denote which signatures are to be counted towards qualifying for the reduced fee.
b. The fee for appeals of affordable housing projects (defined as projects which provide 50 percent or more affordable units for households earning 80% or less of Area Median Income) is $500, which may not be reduced.
c. The fee for all appeals by Applicants is $6,000.
LANDMARKS PRESERVATION COMMISSION
NOTICE OF DECISION
#LMSAP2025-007
1947 Center Street
Mailed: June 2, 2025
3. The appeal must be received prior to 5:00 p.m. on the "APPEAL PERIOD EXPIRATION" date shown above (if the close of the appeal period falls on a weekend or holiday, then the appeal period expires the following business day).
If no appeal is received, the Structural Alteration Permit will be final on the first business day following expiration of the appeal period.
NOTICE CONCERNING YOUR LEGAL RIGHTS:
If you object to this decision, the following requirements and restrictions apply:
1. If you challenge this decision in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence delivered to the Landmarks Preservation Commission at, or prior to, the public hearing.
2. You must appeal to the City Council within fifteen (15) days after the Notice of Decision of the action of the Landmarks Preservation Commission is mailed. It is your obligation to notify the Land Use Planning Division in writing of your desire to receive a Notice of Decision when it is completed.
3. Pursuant to Code of Civil Procedure Section 1094.6(b) and Government Code Section 65009(c)(1), no lawsuit challenging a City Council decision, as defined by Code of Civil Procedure Section 1094.6(e), regarding a use permit, variance or other permit may be filed more than ninety (90) days after the date the decision becomes final, as defined in Code of Civil Procedure Section 1094.6(b). Any lawsuit not filed within that ninety (90) day period will be barred.
4. Pursuant to Government Code Section 66020(d)(1), notice is hereby given to the applicant that the 90-day protest period for any fees, dedications, reservations, or other exactions included in any permit approval begins upon final action by the City, and that any challenge must be filed within this 90-day period.
5. If you believe that this decision or any condition attached to it denies you any reasonable economic use of the subject property, was not sufficiently related to a legitimate public purpose, was not sufficiently proportional to any impact of the project, or for any other reason constitutes a “taking” of property for public use without just compensation under the California or United States Constitutions, your appeal of this decision must include the following information:
A. That this belief is a basis of your appeal.
B. Why you believe that the decision or condition constitutes a "taking" of property as set forth above.
C. All evidence and argument in support of your belief that the decision or condition constitutes a “taking” as set forth above.
If you do not do so, you will waive any legal right to claim that your property has been taken, both before the City Council and in court.
LANDMARKS PRESERVATION COMMISSION
NOTICE OF DECISION
#LMSAP2025-007
1947 Center Street
Mailed: June 2, 2025
PUBLIC COMMENT:
Communications to Berkeley boards, commissions or committees are public record and will become part of the City’s electronic records, which are accessible through the City’s website.
Please note: e-mail addresses, names, addresses, and other contact information are not required, but if included in any communication to a City board, commission or committee, will become part of the public record. If you do not want your e-mail address or any other contact information to be made public, you may deliver communications via U.S. Postal Service or in person to the secretary of the relevant board, commission or committee. If you do not want your contact information included in the public record, please do not include that information in your communication. Please contact the secretary to the relevant board, commission or committee for further information.
FURTHER INFORMATION:
Questions about the project should be directed to the project planner, Joshua Muller, at (510) 981-7488 or [email protected]. All project application materials may be viewed at the Permit Service Center (Zoning counter), 1947 Center Street, 3 rd Fl., during regular business hours.
ATTACHMENTS:
1. Findings and Conditions
2. Project Plans
ATTEST:
Anne Hersch, Secretary
Landmarks Preservation Commission
cc: City Clerk
A t t a c h m e n t 1 , P a r t 2
Findings and Conditions
1947 Center Street – State Farm Insurance Company Building Structural Alteration Permit #LMSAP2024-0007 to replace windows at a National Landmark property.
FINDINGS REQUIRED UNDER CEQA
1. The discretionary design review for this project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA, Public Resources Code §21000, et seq. and California Code of Regulations, §15000, et seq.) pursuant to Section 15331 of the CEQA Guidelines (“Historic Resource Restoration/Rehabilitation”).
FINDINGS RELATED TO THE SECRETARY OF THE INTERIOR’S STANDARDS Regarding the Secretary of the Interior’s Standards (SOI) for Rehabilitation (36 CFR Part 67), the Landmarks Preservation Commission of the City of Berkeley makes the following findings:
1. A property shall be used for its historic purpose or be placed in a new use that requires minimal change to the defining characteristics of the building and its site and environment.
Evidence: The proposed project does not require a change of use.
2. The historic character of a property shall be retained and preserved. The removal of historic materials or alteration of features and spaces that characterize a property shall be avoided.
Evidence: The existing window units are not cited as a significant feature of the landmark in its original landmark application, so the project will therefore avoid the removal of distinctive materials and the alteration of features that characterize the property and will retain the historic character of the property.
3. Each property shall be recognized as a physical record of its time, place, and use.
Changes that create a false sense of historical development, such as adding conjectural features or architectural elements from other buildings, shall not be undertaken.
Evidence: Although the new window units will resemble the original units and designs from the property’s historic Moderne period, the units will not insert ancillary architectural elements from other buildings designed in the Moderne style. These new features are aligned with the specific aesthetic character of the existing building and will not result in a false sense of historical development.
4. Most properties change over time; those changes that have acquired historic significance in their own right shall be retained and preserved.
Evidence: Changes to the property that may have acquired significance in their own right are not affected by this project. There have been no significant modifications or redesigns of the building that could exhibit historical significance.
FINDINGS AND CONDITIONS 1947 Center St – Structural Alteration Permit
5. Distinctive features, finishes, and construction techniques or examples of craftsmanship that characterize a historic property shall be preserved.
Evidence: Distinctive materials, features, finishes, and construction techniques, or examples of craftsmanship that characterize this property, such as recess dimension of the windows and the use of metal as a material, will be substantially retained and preserved with this limited-scope project.
6. Deteriorated historic features shall be repaired rather than replaced. Where the severity of deterioration requires replacement of a distinctive feature, the new feature shall match the old in design, color, texture, and other visual qualities and, where possible, materials. Replacement of missing features shall be substantiated by documentary, physical, or pictorial evidence.
Evidence: As conditioned herein, if deteriorated historic features will be affected by this request, then they would be repaired or replaced to match the materials, design, and finishes of the original items.
7. Chemical or physical treatments, such as sandblasting, that cause damage to historic materials shall not be used. The surface cleaning of structures, if appropriate, shall be undertaken using the gentlest means possible.
Evidence: Standard conditions of approval for a Structural Alteration Permit will require any potential chemical or physical treatments to be undertaken using the gentlest means possible.
8. Significant archeological resources affected by a project shall be protected and preserved. If such resources must be disturbed, mitigation measures shall be undertaken.
Evidence: The project does not have the potential to affect any archaeological resources because no excavation is proposed.
9. New additions, exterior alterations, or related new construction shall not destroy historic materials that characterize the property. The new work shall be differentiated from the old and shall be compatible with the massing, size, scale, and architectural features to protect the historic integrity of the property and its environment.
Evidence: The proposed new work is designed with complimentary, high- qua lity materials in simplified, contemporary style employing colors and finishes that harmonize with the historic design elements of the building. Owing to these aspects, as well as the comprehensive nature of the project scope , new work will be sufficiently differentiated from the historic design.
10. New additions and adjacent or related new construction shall be undertaken in such a manner that if removed in the future, the essential form and integrity of the historic property and its environment would be unimpaired.
Evidence: If the proposed improvements were removed in the future, they would not permanently impair the integrity or essential form of the subject building.
FINDINGS & CONDITIONS 1947 Center Street – Structural Alteration Permit
FINDINGS REQUIRED UNDER LANDMARKS PRESERVATION ORDINANCE
1. Pursuant to Section 3.24.260(C)(1)(a -c) of the Landmarks Preservation Ordinance, the Commission must make the following findings for permit applications for construction, alteration or repair:
(a) For applications relating to landmark sites, the proposed work shall not adversely affect the exterior architectural features of the landmark and, where specified in the designation for a publicly owned landmark, its major interior architectural features; nor shall the proposed work adversely affect the special character or special historical, arc
hitectural or aesthetic interest or value of the landmark and its site, as viewed both in themselves and in their setting.
Evidence: The proposed window replacement will incorporate units that use the same or substantially similar materials, operation, divisions and divided lite patterns as the existing units. The scope of work also involves a significant amount of the windows on the building, which will preserve the visual uniformity of the building’s fenestration treatment and pattern and the overall façade composition. (b) For applications relating to property in historic districts, the proposed work shall not adversely affect the exterior architectural features of the subject property or the relationship and congruity between the subject structure or feature and its neighboring structures and surroundings, including facade, setback and height; nor shall the proposed work adversely affect the special character or special historical, architectural or aesthetic interest or value of the district. The proposed work shall also conform to such further standards as may be embodied in the designation of the historic district.
Evidence: The scope of the application involves a comprehensive rehabilitation of the windows and would not modify the exterior visual character of the building by creating new or removing existing openings. Additionally, the landmark documentation related to the existing building does not cite the window type and characteristics as a distinguishing feature.
(c) For applications relating to structure of merit sites, the proposed work shall not adversely affect the architectural features if architectural merit is the basis for designation; nor shall the proposed work adversely affect the special cultural, educational or historical interest or value if that is the basis for designation.
Evidence: The building in question is not a structure of merit and this finding is therefore not relevant or applicable to this Structural Alteration Permit.
Attachment 1
Findings and Conditions
I. General Administrative Conditions
Regulation Source
Timing/
Implementation
Enforcement/ Monitoring
1. Project Approval . This Structural Alteration Permit approval is for 1947 Center Street, as substantially presented and described to the Landmarks Preservation Commission on May 1, 2025 (“Approval Date”, For any condition herein that requires preparation of a Final Plan where the project applicant has submitted a conceptual plan, the project applicant shall submit final plan(s) in substantial conformance with the conceptual plan, but incorporate the modifications required by the conditions herein for approval by the City. In addition to review by staff, the final plan shall be reviewed by the Chair of the Landmarks Preservation Commission to verify substantial compliance with the scope of the Commission’s approval and accompanying action on the Structural Alteration Permit.
City of Berkeley On-Going Land Use Planning
2. Approval Limited to Proposed Project. This Permit authorizes only the proposed project described in the application. In no way does an approval authorize other uses, structures or activities not included in the project description.
City of Berkeley
BMC Sections
23.404.060
On-Going Land Use Planning
3. Compliance Required. All land uses and structures in Berkeley must comply with the Zoning Ordinance and all applicable City ordinances and regulations. Compliance with the Zoning Ordinance does not relieve an applicant from requirements to comply with other federal, state, and City regulations that also apply to the property.
City of Berkeley
On-Going Land Use Planning
4. Conformance to Approved Final Plan. All work performed under an approved permit shall be in compliance with the approved final plan and any Conditions of Approval.
City of Berkeley
BMC Section
23.404.060. B.4
On-Going Land Use Planning
6. Permit Revocation. The City may revoke or modify a discretionary permit for completed projects due to: 1) violations of permit requirements; 2) Changes to the approved project; and/or 3) Vacancy for one year or more. However, no lawful residential use can lapse, regardless of the length of time of the vacancy. Proceedings to revoke or modify a permit may be initiated by the Landmarks Preservation Commission (LPC), or City Council referral.
City of Berkeley
BMC Section
23.404.080
On-Going Land Use Planning
FINDINGS AND CONDITIONS 1947 Center St – Structural Alteration Permit
I. General Administrative Conditions
Regulation Source
Timing/
Implementation
Enforcement/ Monitoring
8. Exercise and Expiration of Permits A permit authorizing a land use is exercised when both a valid City business license is issued (if required) and the land use is established on the property.
A. A permit authorizing a land use is exercised when both a valid City business license is issued (if required) and the land use is established on the property.
B. A permit authorizing construction is exercised when both a valid City building permit (if required) is issued and construction has lawfully begun.
C. The Zoning Officer may declare a permit lapsed if it is not exercised within one year of its issuance, except if the applicant has applied for a building permit or has made a substantial good faith effort to obtain a building permit and begin construction. The Zoning Officer may declare a permit lapsed only after 14 days written notice to the applicant. A determination that a permit has lapsed may be appealed to the ZAB in accordance with Chapter 23.410 (Appeals and Certification).
D. A permit declared lapsed shall be void and of no further force and effect. To establish the use or structure authorized by the lapsed permit, an applicant must apply for and receive City approval of a new permit.
City of Berkeley
BMC Section
23.404.060 (C)
“Time Limits”
On-Going Land Use Planning
9. Hold Harmless. The permittee agrees as a condition of approval of this application to indemnify, protect, defend with counsel selected by the City, and hold harmless, the City, and any agency or instrumentality thereof, and its elected and appointed officials, officers, employees and agents, from and against any and all liabilities, claims, actions, causes of action, proceedings, suits, damages, judgments, liens, levies, costs and expenses of whatever nature, including reasonable attorney’s fees and disbursements (collectively, “Claims”) arising out of or in any way relating to the approval of this application, any actions taken by the City related to this entitlement, or any environmental review conducted under the California Environmental Quality Act, Public Resources Code Section 210000 et seq., for this entitlement and related actions. The indemnification shall include any Claims that may be asserted by any person or entity, including the permittee, arising out of or in connection with the approval of this application, whether or not there is concurrent, passive or active negligence on the part of the City of Berkeley On-Going Land Use Planning
FINDINGS & CONDITIONS 1947 Center Street – Structural Alteration Permit
I. General Administrative Conditions
Regulation Source
Timing/
Implementation
Enforcement/ Monitoring
City, and any agency or instrumentality thereof, and its elected and appointed officials, officers, employees and agents. The permittee’s duty to defend the City shall not apply in those instances when the permittee has asserted the Claims, although the permittee shall still have a duty to indemnify, protect and hold harmless the City.
II. At Building Permit Submittal
Regulation Source
Timing/Implementation
Enforcement/ Monitoring
1. Conditions of Approval on Building Permit Plan Submittal Structural Alteration Permit. The Conditions of Approval for this Structural Alteration Permit shall be printed on the second sheet of each plan set submitted for a building permit pursuant to this Structural Alteration Permit, under the title ‘Structural Alteration Permit Conditions.’
City of Berkeley At the Time of Building
Permit Submittal
Building & Safety/Land Use
Planning
2. Project Liaison. The applicant shall include in all building permit plans and post onsite the name and telephone number of an individual empowered to manage construction-related complaints generated from the project. The individual’s name, telephone number, and responsibility for the project shall be posted at the project site for the duration of the project in a location easily visible to the public. The individual shall record all complaints received and actions taken in response, and submit written reports of such complaints and actions to the project planner on a weekly basis.
Please designate
the name of this individual below:
Project Liaison ____________________________________________________ Name Phone #
City of Berkeley At the Time of Building
Permit Submittal
Building & Safety/Land Use
Planning
3. Construction and Demolition Diversion. The applicant shall submit a Construction Waste Management Plan that meets the requirements of BMC Chapter 19.37 including 100% diversion of asphalt, concrete, excavated soil and land-clearing debris and a minimum of 65% diversion of other nonhazardous construction and demolition waste.
City of Berkeley
BMC Chapter 19.37
At Building Permit
Submittal
Building & Safety Division
FINDINGS AND CONDITIONS 1947 Center St – Structural Alteration Permit
III. During Construction
A. Building & Safety Division
Regulation Source
Timing/ Implementation
Enforcement/ Monitoring
1 Construction Hours. Construction activity shall be limited to between the hours of 7:00 AM and 6:00 PM on Monday through Friday, and between 9:00 AM and 4:00 PM on Saturday.
No construction-related activity shall occur on Sunday or any Federal Holiday.
City of Berkeley During Construction Building & Safety
2. Construction Hours- Exceptions. It is recognized that certain construction activities, such as the placement of concrete, must be performed in a continuous manner and may require an extension of these work hours. Prior to initiating any activity that might require a longer period, the developer must notify the Zoning Officer and request an exception for a finite period of time.
If the Zoning Officer approves the request, then two weeks prior to the expanded schedule, the developer shall notify businesses and residents within 500 feet of the project site describing the expanded construction hours. A copy of such notice and methodology for distributing the notice shall be provided in advance to the City for review and approval. The project shall not be allowed more than 15 extended working days.
City of Berkeley During Construction Building & Safety
3. Construction / No Parking Permits. Contact the Permit Service Center (PSC) at 1947 Center Street, Third Floor or (510) 981-7500 for details on obtaining Construction/No Parking Permits (and associated signs and accompanying dashboard permits). Please note that the Zoning Officer and/or Traffic Engineer may limit off-site parking of construction-related vehicles if necessary to protect the health, safety or convenience of the surrounding neighborhood. A current copy of this Plan shall be available at all times at the construction site for review by City Staff.
City of Berkeley During Construction Building & Safety
FINDINGS & CONDITIONS 1947 Center Street – Structural Alteration Permit
IV. During Construction
B. During Construction: Public Works
Regulation Source
Timing/ Implementation
Enforcement/ Monitoring
1. Site Debris. All piles of debris, soil, sand, or other loose materials shall be covered at night and during rainy weather with plastic at least one-eighth millimeter thick and secured to the ground.
City of
Berkeley
During Construction Public Works
2. Street & Sidewalk Damages. Subject to approval of the Public Works Department, the applicant shall repair any damage to public streets and/or sidewalks by construction vehicles traveling to or from the project site.
City of
Berkeley
During Construction Public Works
3. Underground Utilities. If underground utilities leading to adjacent properties are uncovered and/or broken, the contractor involved shall immediately notify the Public Works Department and the Building & Safety Division, and carry out any necessary corrective action to their satisfaction
City of
Berkeley
During Construction Public Works
4. Hauling of Debris. Trucks hauling debris, soil, sand, or other loose materials shall be covered or required to maintain at least two feet of board.
City of
Berkeley
During Construction Public Works
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:34 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-G000a.dwg© Copyright 2025. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KEL/JAW
AJB
As Noted
TITLE SHEET
G000
HISTORIC STEEL WINDOW SCHEMATIC DESIGN
1947 CENTER STREET, BERKELEY, CA 94704
GENERAL NOTES
1. THE BUILDING IS A REGISTERED HISTORIC RESOURCE. ALL WORK MUST CONFORM TO THE SECRETARY OF THE INTERIOR'S STANDARDS FOR THE TREATMENT OF HISTORIC BUILDINGS.
2. DRAWINGS AND ASSOCIATED SPECIFICATIONS APPLY ONLY TO THE SPECIFIC PROJECT IDENTIFIED IN
TITLEBLOCK AND SHALL NOT BE USED FOR ANY OTHER PURPOSE WITHOUT SPECIFIC WRITTEN CONSENT OF ARCHITECT/ENGINEER, ARCHITECT/ENGINEER'S SUB-CONSULTANTS, AND OWNER. ANY UNAUTHORIZED USE
OF ARCHITECT/ENGINEER'S WORK PRODUCT SHALL BE AT USER'S SOLE RISK AND USER SHALL INDEMNIFY ARCHITECT/ENGINEER AGAINST ANY LIABILITY OR LEGAL EXPOSURE RELATED TO THE UNAUTHORIZED USE.
3. DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY, ARE TO BE TAKEN AS A WHOLE, AND SHOULD
INCLUDE SUFFICIENT INFORMATION NECESSARY FOR THE EXECUTION AND COMPLETION OF THE WORK IN A MANNER CONSISTENT WITH THE DESIGN INTENT. IN THE ABSENCE OF EXPLICIT OR REASONABLY INFERABLE
INFORMATION ON DRAWINGS OR IN SPECIFICATIONS, PROMPTLY SEEK CLARIFICATION FROM ARCHITECT/ENGINEER AS A REQUEST FOR INFORMATION.
4. SPECIFIED PRODUCTS ARE BELIEVED TO HAVE PROPERTIES ADEQUATE FOR THE INTENDED PURPOSE. IF
CONTRACTOR HAS PREVIOUSLY FOUND SPECIFIED PRODUCTS TO BE UNACCEPTABLE FOR ANY REASON, CONTRACTOR SHALL PROMPTLY INFORM ARCHITECT/ENGINEER AS A REQUEST FOR SUBSTITUTION.
5. PROMPTLY REPORT TO ARCHITECT/ENGINEER AS A REQUEST FOR INFORMATION KNOWN OR SUSPECTED
ERRORS, INCONSISTENCIES, OR OMISSIONS WITHIN OR BETWEEN DRAWINGS AND SPECIFICATIONS AS WELL AS KNOWN OR SUSPECTED VARIANCE OF DRAWINGS AND SPECIFICATIONS FROM EXISTING CONDITIONS. FOR
BIDDING PURPOSES ONLY AND UNLESS OTHERWISE DIRECTED BY ARCHITECT/ENGINEER, THE MORE STRINGENT REQUIREMENT OR BETTER QUALITY SHALL TAKE PRECEDENCE.
6. DIMENSIONS, QUANTITIES, AND GEOMETRIES PROVIDED FOR EXISTING CONSTRUCTION ARE BASED ON ORIGINAL DRAWINGS AND LIMITED FIELD DOCUMENTATION BY ARCHITECT/ENGINEER. FIELD VERIFY
APPLICABLE INFORMATION PRIOR TO SUBMITTING A BID, ORDERING MATERIALS, OR OTHERWISE COMMITTING RESOURCES TO THE WORK. PROVIDED DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS.
7. PROVIDE LABOR, MATERIALS, EQUIPMENT, SUPERVISION, AND COORDINATION DIRECTLY AND INCIDENTALLY NECESSARY TO PERFORM THE WORK IN ACCORDANCE WITH CONTRACT DOCUMENTS.
8. ACTIVITIES OR DUTIES OF ARCHITECT/ENGINEER OR TESTS, INSPECTIONS, OR APPROVALS REQUIRED OR
PERFORMED BY THIRD PARTIES SHALL NOT RELIEVE CONTRACTOR OF ITS OBLIGATION TO PERFORM THE WORK IN ACCORDANCE WITH CONTRACT DOCUMENTS.
9. SECURE AND PAY FOR ALL PERMITS, FEES, LICENSES, AND INSPECTIONS BY GOVERNMENT AGENCIES NECESSARY FOR PROPER AND COMPLIANT EXECUTION AND COMPLETION OF THE WORK.
10. COMPLY WITH AND GIVE NOTICES REQUIRED BY LAWS, STATUTES, ORDINANCES, CODES, RULES AND REGULATIONS, AND LAWFUL ORDERS OF AUTHORITIES HAVING JURISDICTION APPLICABLE TO THE WORK.
11. SUPPLY OWNER WITH SAFETY DATA SHEETS (SDS) FOR EACH CHEMICAL THAT WILL BE BROUGHT ONTO OWNER'S PROPERTY.
12. CONTRACTOR IS SOLELY RESPONSIBLE FOR, AND SHALL HAVE SOLE CONTROL OVER, CONSTRUCTION MEANS,
METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES, AND FOR COORDINATING ALL PORTIONS OF THE WORK. ARCHITECT/ENGINEER HAS NO SUCH RESPONSIBILITIES. SPECIFIC INSTRUCTION THAT MAY BE GIVEN
IN CONTRACT DOCUMENTS CONCERNING CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES SHALL NOT RELIEVE CONTRACTOR OF ITS RESPONSIBILITY FOR CONTROL AND COORDINATION.
13. CONTRACTOR IS SOLELY RESPONSIBLE FOR INITIATING, MAINTAINING, AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF THE WORK.
ARCHITECT/ENGINEER HAS NO SUCH RESPONSIBILITIES BEYOND ITS OWN EMPLOYEES.
14. THE WORK WILL BE PERFORMED AT AN OCCUPIED AND OPERATIONAL FACILITY. COORDINATE CONSTRUCTION
ACTIVITIES AND PROCEDURES WITH OWNER TO (A) MAINTAIN UNOBSTRUCTED EXISTING MEANS OF EGRESS FROM FACILITY; (B) COMPLY WITH FACILITY'S EXISTING SECURITY PROCEDURES AND REQUIREMENTS; AND (C) PROVIDE NOT LESS THAN 48 HOURS ADVANCE NOTICE TO AND GAIN APPROVAL FROM OWNER PRIOR TO
CONSTRUCTION ACTIVITIES THAT WILL DISRUPT NORMAL USE OF FACILITY (INCLUDING EXCEPTIONAL NOISE AND/OR VIBRATIONS, UNCONTROLLED DUST, OBTRUSIVE ODORS, OR INTERRUPTIONS OF UTILITIES). WORK
NOT COORDINATED AND APPROVED IN ADVANCE THAT DISRUPTS THE NORMAL USE OF THE FACILITY MAY BE STOPPED UNTIL PROPER COORDINATION AND APPROVAL IS ACHIEVED. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY COSTS INCURRED AS A CONSEQUENCE OF STOPPAGE.
15. SUBMIT PROPOSED DEMOLITION AND CONSTRUCTION SCHEDULES TO OWNER AND ARCHITECT/ENGINEER PRIOR TO BEGINNING WORK. PROCEED WITH THE WORK ONLY AFTER A MUTUALLY AGREEABLE SCHEDULE HAS BEEN ESTABLISHED. REGULARLY REVISE SCHEDULE TO REFLECT PROGRESS OF THE WORK.
16. MAINTAIN PREMISES AND SURROUNDING AREA FREE FROM ACCUMULATIONS OF WASTE MATERIAL AND RUBBISH RESULTING FROM THE WORK.
17. COORDINATE LOCATIONS OF ON-SITE STORAGE OF MATERIALS AND EQUIPMENT WITH OWNER SO AS TO NOT UNREASONABLY ENCUMBER FACILITY OR SITE.
18. DO NOT ALLOW CONSTRUCTION MATERIALS, EQUIPMENT, OR PROCEDURES TO OVERLOAD OR EXCEED THE
STRUCTURAL CAPACITY OF EXISTING CONSTRUCTION TO REMAIN, PARTIALLY COMPLETED WORK, OR COMPLETED WORK. MAKE INSPECTIONS AND/OR PERFORM ANALYSES AND TESTS NECESSARY TO VERIFY THAT EXISTING ELEMENTS HAVE ADEQUATE CAPACITY TO SUPPORT PROPOSED CONSTRUCTION LOADS.
19. DRAWINGS ILLUSTRATE THE COMPLETED WORK WITH ELEMENTS IN THEIR FINAL INTENDED POSITIONS.
PROVIDE SHORING, BRACING, SUPPORT, AND SEQUENCE WORK AS REQUIRED TO MAINTAIN THE STRUCTURAL INTEGRITY OF NEW OR EXISTING CONSTRUCTION DURING THE WORK.
20. TEMPORARILY RELOCATE AND RESTORE EXISTING EQUIPMENT AND APPURTENANCES (WHETHER OR NOT SHOWN ON THE DRAWINGS) THAT OBSTRUCT ACCESS TO PORTIONS OF THE WORK.
21. DEVELOP, IMPLEMENT, ERECT, AND MAINTAIN SAFEGUARDS TO PREVENT DAMAGE, INJURY, OR LOSS RESULTING FROM THE WORK TO (A) WORKERS, OCCUPANTS, PASSERS-BY, AND OTHER PERSONS; (B)
IN-PROGRESS WORK, MATERIALS, AND EQUIPMENT UNDER CARE, CUSTODY, AND CONTROL OF THE CONTRACTOR (WHETHER ON OR OFF SITE); AND (C) OTHER PROPERTY AT THE SITE OR ADJACENT THERETO NOT DESIGNATED AS PART OF THE WORK FOR REMOVAL, RELOCATION, OR REPLACEMENT. IN THE EVENT OF DAMAGE, INJURY, OR LOSS, PROMPTLY NOTIFY ARCHITECT/ENGINEER AND PRESENT PROPOSED REMEDY.
22. DEVELOP, IMPLEMENT, ERECT, AND MAINTAIN SAFEGUARDS TO PROVIDE FOR WATERTIGHT INTEGRITY OF WORK IN PROGRESS. IN THE EVENT OF DAMAGE, INJURY, OR LOSS, PROMPTLY NOTIFY ARCHITECT/ENGINEER AND PRESENT PROPOSED REMEDY.
23. IN AN EMERGENCY AFFECTING SAFETY OF PERSONS OR PROPERTY, ACT TO PREVENT OR STOP FURTHER DAMAGE, INJURY, OR LOSS.
24. ALL WORK SHALL BE SUBJECT TO REVIEW BY ARCHITECT/ENGINEER BEFORE IT IS CONCEALED BY OTHER WORK AND/OR MEANS OF ACCESS IS REMOVED. COORDINATE MANDATORY REVIEWS WITH ARCHITECT/ENGINEER PRIOR TO START OF CONSTRUCTION. PROVIDE REASONABLE NOTIFICATION TO ARCHITECT/ENGINEER TO ALLOW FOR SUCH REVIEW AS WORK PROCEEDS.
25. PROMPTLY CORRECT WORK REJECTED BY ARCHITECT/ENGINEER OR FAILING TO CONFORM TO REQUIREMENTS OF THE CONTRACT DOCUMENTS. ASSOCIATED COSTS (INCLUDING ADDITIONAL TESTING OR
INSPECTIONS, COST OF UNCOVERING AND CORRECTION, AND COMPENSATION FOR ARCHITECT/ENGINEER'S SERVICES AND EXPENSES MADE NECESSARY THEREBY) SHALL BE THE CONTRACTOR'S RESPONSIBILITY.
EXISTING CONSTRUCTION
1. EXISTING ITEMS ARE INDICATED AS EXISTING OR (E). ITEMS WITHOUT THIS INDICATION ARE NEW CONSTRUCTION. FOR CLARITY, SOME NEW CONSTRUCTION MAY BE INDICATED AS (N).
2. DIMENSIONS OF THE EXISTING CONSTRUCTION SHOWN ARE BASED ON LIMITED FIELD MEASUREMENTS.
ACTUAL DIMENSIONS AND ELEVATIONS OF THE EXISTING CONSTRUCTION VARY. FIELD-VERIFY EXISTING DIMENSIONS AND CONDITIONS PRIOR TO STARTING THE WORK. ADJUST DIMENSIONS OF THE NEW CONSTRUCTION TO FIT THE EXISTING CONDITIONS.
3. LOCATIONS OF EXISTING CONCRETE REINFORCING AND EMBEDDED STEEL AND EMBEDDED UTILITIES ARE NOT KNOWN. NOT ALL OBSTRUCTIONS ARE NOTED ON PLANS. WHERE SHOWN ON DRAWINGS, THE DEPICTIONS ARE DIAGRAMMATIC. CONTRACTOR SHALL USE NON-DESTRUCTIVE TECHNIQUES TO POSITIVELY IDENTIFY EMBEDDED ITEMS PRIOR TO DEMOLITION. CONTACT THE CONTRACTING OFFICER IF EMBEDDED ITEMS INTERFERE WITH WORK. REINFORCING (SUCH AS, BUT NOT LIMITED TO, REINFORCING TIES) SHALL BE FABRICATED TO FIT ACTUAL CONDITIONS. CONTRACTOR SHALL IDENTIFY OBSTRUCTIONS AND EMBEDDED ITEMS IN FIELD PRIOR TO DEMOLITION.
4. DURING ALL STAGES OF CONSTRUCTION, PROTECT THE EXISTING BUILDING ELEMENTS THAT ARE TO REMAIN.
DAMAGE TO THE EXISTING ELEMENTS SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE REPAIRED TO THE SATISFACTION OF THE NATIONAL PARK SERVICE AT THE CONTRACTOR'S EXPENSE.
5. DETAILS NOT SHOWN, OR DETAILED ON DRAWINGS, OR CALLED FOR IN THESE NOTES SHALL BE
CONSTRUCTED TO SAME SIZE AND CHARACTER AS FOR SIMILAR CONDITIONS WHICH ARE SHOWN, DETAILED OR SPECIFIED.
6. PROVIDE OTHER MATERIALS NOT SPECIFICALLY DESCRIBED BUT REQUIRED FOR COMPLETE AND PROPER
INSTALLATION OF WORK AS SELECTED BY THE CONTRACTOR AND SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER.
HAZARDOUS MATERIALS
1. HAZARDOUS MATERIALS REPORTS HAVE BEEN PREPARED FOR THIS SITE. THE REPORT(S) ARE INCLUDED IN THE SUPPLEMENTAL INFORMATION DOCUMENTS.
2. THE PROJECT MANUAL CONTAINS INFORMATION ON EXISTING HAZARDOUS CONDITIONS AND HAZARDOUS MATERIAL PROCEDURES, REFER TO THE HAZARDOUS MATERIALS SPECIFICATION SECTIONS.
3. HAZARDOUS MATERIALS ARE TYPICALLY NOT CALLED OUT IN THE DRAWINGS. REFER TO THE REPORT(S) FOR LOCATIONS. ANY DRAWING CALLOUTS TO SPECIFIC MATERIALS OR LOCATIONS DOES NOT RELIEVE THE
CONTRACTOR FROM RESPONSIBILITY FOR SPECIFIED TREATMENT AT ALL LOCATIONS, WHETHER CALLED OUT OR NOT.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT PERSONNEL WITHIN THE WORK AREA AND
ADJACENT OCCUPIED STRUCTURES ARE PROTECTED FROM EXPOSURE TO ANY HAZARDOUS MATERIALS FROM THE WORK OF THIS PROJECT.
5. IF UNKNOWN MATERIALS ARE DISCOVERED THAT MAY BE HAZARDOUS, THAT ARE OUTSIDE THE SCOPE OF
THE REPORTS AND SPECIFICATIONS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND CEASE WORK UNTIL CONDITIONS CAN BE MAINTAINED IN COMPLIANCE WITH ALL APPLICABLE REGULATIONS. 1SCALE: N.T.S.
VICINITY MAP
CREATED BY NEARMAP ON 9/30/2024. ANNOTATIONS BY WJE.
N
TRUE
NORTH
2SCALE: N.T.S.
SITE MAP
CREATED BY NEARMAP ON 9/30/2024. ANNOTATIONS BY WJE.
N
TRUE
NORTH
PROJECT LOCATION
PROJECT LOCATION
UNIVERSITY AVENUE
ADDISON STREET
CENTER STREETALLSTON WAY
KITTREDGE STREET
BANCROFT WAY
MARTIN LUTHER KING JR WAY
MILVIA STREET
SHATTUCK AVENUE
KALA BAGAI WAY
MCKINLEY AVENUE
GRANT STREET
BERKELEY WAY
CENTER STREET
ADDISON STREET
MILVIA STREET
Sheet List Table
Sheet Number Sheet Title
G000 TITLE SHEET
A200BASEMENT FLOOR PLAN
A201FIRST FLOOR PLAN
A202SECOND FLOOR PLAN
A203THIRD FLOOR PLAN
A204FOURTH FLOOR PLAN
A205FIFTH FLOOR PLAN
A206SIXTH FLOOR PLAN
A301SOUTH ELEVATION
A302EAST ELEVATION
A303WEST ELEVATION
A304NORTH ELEVATION
A401SECTIONS
A402WINDOW SCHEDULE AND EXISTING WINDOWS
A501WINDOW REPAIR ELEVATIONS
A502WINDOW REPLACEMENT ELEVATIONS
A503WINDOW REPLACEMENT DETAILS
A504WINDOW REPAIR DETAILS
A505CONCRETE REPAIR DETAILS
MATERIALS DESCRIPTIONS
SEALANTSilPruf SCS2000
BACKER RODSofRod BY NOMACO
ELASTOMERIC COATINGSika Thorolastic 750 (MULTIPLE COLORS AND TEXTURES TBD) REPAIR MORTARSikatop 123 Plus
PARGE COATSikatop 123 Plus (TEXTURED FINISH)
STEEL WINDOW PRIMERKem Kromik Universal Metal Primer
STEEL WINDOW COATING Sher-Cryl HPA BY SHERWIN WILLIAMS
REBAR CORROSION INHIBITOR Sika Armatec 110 EpoCem or Sikagard P 8100 AP MONOLITHIC GLASS6mm CLEAR GLASS
INSULATING GLASS UNIT6mm CLEAR GLASS WITH SB70 - 12mm
ARGON-FILLED GAP - 6mm CLEAR GLASS
ALUMINUM WINDOWSGraham Windows SR6700 SERIES STEEL REPLICA JOCKEY SASHESWausau SEAL 1737 SERIES CASEMENT WINDOW
Attachment 1, Part 3
UP
F
E
F
E F
E
F
E
F
E
F
E
UP DN
F
E
F
E
F
E
F
E
F
E
F
E
F
E
1 OAK
A1WAL2
OAK
A1WAL2
OAK
A1WAL2
OAK
A1WAL2
OAK
A1WAL2
LT/30
LT/30
LT/30
LT/30
LT/ 30
FDU/36
FDU/36
FDU/36
FDU/36
FDU/30
FDU/24
24/3 6
24/3 6
24/3 6
24/3 6
24/ 5424/ 5424/ 5424/ 54
24/36
24/36
24/36
24/36
24/3 6
24/54
24/36
F62/36G
F32/36G
F62/36G
F32/36G
F62/36G
F32/36G
F62/36G
F32/36G F32/24GF32/30GF32/24GF32/30GF32/24GF32/30GF32/24GF32/30G F6 2/ 36 N
F6 2/ 36 N
F6 2/ 36 N
F6 2/ 36 N
F3 2/ 36 G F3 2/ 36 G
62/36G 62/24G 62/30N
62 / 2 4 N
BBF
T
BBF
T
BBF
T
BBF
T
FF
T
FF
T
FF
T
FF
T
BBF
T
FF
T
06 ET
C
B
A
06 ET
C
B
A
C
B
A
C
B
A
C
B
A
DNUP
F
E
F
E
F
E
F
E
F
E
F
E
F
E
F
E
UP DN
F
E
F
E
F
E
F
E
F
E
F
E
F
E
UP
OAK
A1WAL2
24 /3 6
2 4 / 3 6
F 6 2 / 3 6 N
F 47/ 36G
F 4 7 / 2 4 NF 39/ 36G
F 4 7 / 2 4 N
G14/ 36G14/ 36
F 4 7 / 3 6 N
FF
T
B B F
T
DNUP
F
E
F
E
F
E
F
E
F
E
DNUP
ELEVATORSSTAIR
STAIRSTAIR
SQ
FT
16,969
BASEMENT
- GSF
SQ
FT
16,856
FIRST -
GSF
ELEVATORSSTAIR
STAIRSTAIR
ELEVATORS
STAIR
STAIRSTAIR
SQ
FT
13,945
SECOND -
GSF
ROOF
ELEVATORS
STAIR
STAIRSTAIR
SQ
FT
14,017
FOURTH -
GSF
ELEVATORS
STAIR
STAIRSTAIR
SQ
FT
14,004
FIFTH -
GSF
SQ
FT
14,015
THIRD
-GSF
ELEVATORSSTAIR
STAIRSTAIR
ELEVATORSSTAIR
STAIRSTAIR
SQ
FT
13,984
SIXTH -
GSF
DRAFT!
NOT FOR
CONSTRUCTION
729 Heinz Avenue
Berkeley, CA 94710
tel 510.542.2200
fax 510.542.2201
APPROVALS
SEAL
SHEET TITLE
SHEET NUMBER
PROJECT TITLE
REVISIONS
N&T JOB NUMBER
ISSUE DATE
11/7/2024 5:26:48 PM C:\Users\tom.beil\Documents\Revit Locals\Berkeley 1947 Center 2024_detached_tom.beil.rvt
CITY OF
BERKELEY 1947
Center Street
Exterior Window
Replacement
GROSS AREA PLANS
G001
Structural Alteration
Permit
21401
SEPTEMBER, 2024
1947 Center Street
Berkeley CA
3/64" = 1'-0"G001
00- BASEMENT0
3/64" = 1'-0"G001
01- FIRST FLOOR1
3/64" = 1'-0"G001
02- SECOND FLOOR2
3/64" = 1'-0"G001
04- FOURTH FLOOR4
3/64" = 1'-0"G001
05- FIFTH FLOOR (FOR REFERENCE ONLY)5
3/64" = 1'-0"G001
03- THIRD FLOOR3
3/64" = 1'-0"G001
06- SIXTH FLOOR (FOR REFERENCE ONLY)6
▲N
GROSS AREA SUMMARY
AREA SCHEDULE (GSF)
Lev
el Area
BASEMENT 16969 SF
FIRST FLOOR 16856 SF
SECOND FLOOR 13945 SF
THIRD FLOOR 14015 SF
FOURTH FLOOR 14017 SF
FIFTH FLOOR 14004 SF
SIXTH FLOOR 13984 SF
103790 SF
# DATE DESCRIPTION
H
G
F
FE
FE
FE
E
ELEV 3
FE
(FREIGHT)
DFE
UPELEV 2
ELEV 1
C
B
ELEV 4
A
FE
A401
1 A401
2 A301
1 A302
1 A303
1 A304
1 12
15' - 1" VIF23' - 8" VIF
3 23' - 6" VIF
4 147' - 11 1/4"
23' - 6" VIF23' - 7" VIF23' - 7" VIF15' - 0 1/4" VIF
5678
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:34 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A200.dwg© Copyright 2025. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
BASEMENT FLOOR
PLAN
A200
1SCALE: 3/32" = 1'-0"
BASEMENT FLOOR PLAN (FOR REFERENCE ONLY)
N
PLAN NORTH
N
TRUE NORTH
1 15' - 1" VIF
2 23' - 8" VIF
3 23' - 6" VIF
4 147' - 11 1/4"
23' - 6" VIF23' - 7" VIF23' - 7" VIF15' - 0 1/4" VIF
H
ACCOUNTING
MANAGER
OFFICE
129A
119 SF
STAIR N0. 2
S2-1ST
OPEN OFFICE -
ACCOUNTING
129
511 SF
OPEN OFFICE -
ACCOUNTING/
REVENUE
39 SF
STOR
124
CLOSET
123A
PRIVATE OFFICE
123
134 SF
HALLWAY
108
FEFEHALL
107
CONFERENCE
ROOM
134
164 SF
MECH
131
CONFERENCE
135
304 SF
105 SF
FILES
138
FINANCE
STORAGE
132
117 SF
OPEN OFFICE -
TREASURY
136
1578 SF
C
FINANCE
RECEIVING
ROOM
133
128 SF
1044 SF
LOBBY
101
PUBLIC WAITING
AREA
140
872 SF
B
CS SERVICE
WINDOWS
137
192 SF
ELEV 4
PARKING
HEARING ROOM
139
80 SF
ENTRY
110
LIFTPRC OFFICER
OFFICE
148
263 SF
PRC STOR
148A
19 SF
PRC OFFICE
149
157 SF
OESD SHARED
OFFICE
150
230 SF
(2 PEOPLE)
OESD DIVISION
MANAGER
OFFICE
151
181 SF
A
B
PUBLIC AREA
147
214 SF
PRC RECEPTION
146
169 SF
ELEV 1
UPDN
STAIR NO. 1
S1-1ST
ELEV 2
ELEC
103
WOMEN
104
HALL
105MEN
106
233 SF
BREAK
141
SHARED
COPY/FILE
142
112 SF
PRC STOR
143
MDF - IT
145
61 SF
FE
(INTERNS / TEMP /
OVERFLOW)
OESD OFFICE
144
133 SF
C
OPEN OFFICE -
OESD
152
922 SFSERVICE
CORRIDOR
165
CONFERENCE/HEARING
ROOM
153
327 SF
D
STOR
126
E
ELEV 3
(FREIGHT)
PUBLIC AREA -
TOXICS
114
CONFERENCE/HEARING
ROOM
116
COLLECTION
125
1815 SF
TOXICS
MANAGER
OFFICE
112
122 SFOPEN OFFICE -
TOXICS
111
STAIR N0.3
S3-1ST
G
FINANCE
STORAGE/SAFE
121
110 SF
STORAGE
122
390 SF
TOXICS
5678
A1
3 A
STORAGE
154F 92 SF
FE
FE
FE
FE
A401
1 A401
2 A301
1 A302
1 A303
1 A304
1 2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:34 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A201.dwg© Copyright 2025. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
FIRST FLOOR PLAN
A202
N
PLAN NORTH
N
TRUE NORTH
1SCALE: 3/32" = 1'-0"
FIRST FLOOR PLAN (FOR REFERENCE ONLY)
12 15' - 1" VIF23' - 8" VIF
3 23' - 6" VIF
4 147' - 11 1/4"
23' - 6" VIF23' - 7" VIF23' - 7" VIF15' - 0 1/4" VIF
H
ROOF
ROOF
FE
WORK AREA -
HHCS
227
356 SF
SHARED OFFICE
225
124 SF
SHARED OFFICE
222
160 SFSHARED OFFICE
224
165 SF
FE
HALL
240
SHARED OFFICE
221
172 SF37 SF
STOR
218
MECH
217
SHARED OFFICE
220
157 SF
DEPT
OPERATIONS
CENTER
214
508 SFMEDICAL
RECORDS
215
112 SF
COPY/MAIL
216
113 SF
HALL
223
37 SF
STOR
219
D
FEUPDN
ELEV 2
STAIR N0. 1
S1-2ND
156 SF
LOBBY
201
ELEV 1
OPEN OFFICE -
LAND USE
PLANNING
249
CONFERENCE
ROOM
251
149 SF
C
FE
153 SF
OFFICE
213
VITAL STATS
212
148 SF
SHARED OFFICE
210
153 SF
SHARED OFFICE
209
154 SF
CONFERENCE/TRAINING
203
479 SF
171 SF
OFFICE
211
147 SF
OFFICE
208
142 SF
OFFICE
207
120 SF
OFFICE
206
244 SF
OFFICE
205
STOR
258 A
PLANNING
MANAGER
OFFICE
258
182 SF
POLICY OFFICE
257
122 SF
POLICY OFFICE
256
140 SF
PROJECTS
OFFICE
255
144 SF
PROJECTS
OFFICE
254
154 SF
A
143 SF
OFFICE
204
HALL
202
FE
COPY/SUPPLY
ROOM
252
144 SF
INTERN ROOM
253
141 SF
B
IDF - ELEC / IT
262
WOMEN
263
HALL
264
MEN
265
BREAK
266
128 SF
OFFICE
233
130 SF
OFFICE
234
OPEN WORK
AREA
237
CONFERENCE
235
136 SF
SMALL
F3
518 SF
OPEN OFFICE -
HHCS
230
280 SFSHARED OFFICE
232
156 SF
ASSOC.
MANAGEMENT
SPECIALIST
238
144 SFF
STAIR N0. 3
S3-2ND
202 SF
G
5678
FE
E
FE
FE
A401
1 A401
2 A301
1 A302
1 A303
1 A304
1 2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:34 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A202.dwg© Copyright 2025. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
SECOND FLOOR PLAN
A202
1SCALE: 3/32" = 1'-0"
SECOND FLOOR PLAN (FOR REFERENCE ONLY)
N
PLAN NORTH
N
TRUE NORTH
12 15' - 1" VIF23' - 8" VIF
3 23' - 6" VIF
4 147' - 11 1/4"
23' - 6" VIF23' - 7" VIF23' - 7" VIF15' - 0 1/4" VIF
H
7 A3.03.2
STAIR NO.2
S2-3RDFE
54 SF
MECH
322
HOUSING
CLOSET
325A
HOUSING
INSPECTOR
SUPERVISOR
325
114 SF
FE
A1
3 A
B&S OFFICE
326
123 SF
BREAK ROOM
331
209 SF
B&S OFFICE
335
195 SF
HALL
337
JANITOR
332
ASSISTANT
BUILDING
OFFICIAL
OFFICE
336
PSC
COORDINATOR
OFFICE
351
232 SF
PSC PLAN
CHECK
COORDINATION
330
177 SF
PSC PLAN
CHECKER
352
141 SF
PUBLIC / STAFF
CONFERENCE
328
247 SF
OPEN OFFICE -
PS
329
797 SF
214 SF
CASHIERS
OFFICE
333
144 SF
CASHIER
334
75 SF
33 SF
ELEC
303
160 SF
WOMEN
304
110 SF
HALL
305
212 SF
MEN
306
1544 SF
HALL
340PLAN
COLLATION &
STORAGE
307
108 SF
PLAN CHECKER
OFFICE
341
112 SF
P/C PLAN
CHECKER
OFFICE
342
117 SF
UPDN
ELEV 2
STAIR NO. 1
S1-3RDINFO CENTER +
WELCOME DESK
301
445 SFELEV 2
10 SF
IT
345
P/C CHECKER
OFFICE
343
102 SF
BLDG
INSPECTOR
SUPERVISOR
363
118 SF
PLAN CHECK
SUPERVISOR
OFFICE
347
160 SF
P/C SENIOR
ENGINEER
OFFICE
346
132 SF
P/C ENGINEER
PLAN CHECK
OFFICE
348
148 SF
PLAN CHECK /
STATION 13
344
135 SF
P/C FIRE OFFICE
349
148 SF
PW
ENGINEERING
PLAN CHECK
362
138 SF
PERMIT CENTER
PUBLIC WAITING
302
1328 SF
B COPY/FILE
AREACONFERENCE
360
351 SF
PUBLIC SERVICE
COUNTERS
310
1085 SF
OPEN OFFICE -
ADMIN
350
C
BUILDING
OFFICIAL
361
233 SF
D
E
INSPECTION
DESK AREA
323
CONFERENCE/TRAINING
321
623 SF
F
OPEN OFFICE -
BLDG INSPECT
320
STAIR NO.3
S3-3RD
G
5678
CSS3 OFFICE
359A 120 SF
FE
FE
FE
E-PLAN CHECK
MONITORS
A401
1 A401
2 A301
1 A302
1 A303
1 A304
1 2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:35 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A203.dwg© Copyright 2025. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
THIRD FLOOR PLAN
A203
1SCALE: 3/32" = 1'-0"
THIRD FLOOR PLAN (FOR REFERENCE ONLY)
N
PLAN NORTH
N
TRUE NORTH
12 15' - 1" VIF23' - 8" VIF
3 23' - 6" VIF
4 147' - 11 1/4"
23' - 6" VIF23' - 7" VIF23' - 7" VIF15' - 0 1/4" VIF
H
5678
STAIR NO. 2
S2-4TH
STAIR NO. 3
S3-4TH
MECH
421
OPEN OFFICE -
OPEN OFFICE -
PUBLIC WORKS
420
1299 SF
F
DISABILITY
PW OFFICE
466
154 SF
PW OFFICE
465
152 SFFE
HALL
457
FE
E
PW OFFICE
464
154 SF
PW OFFICE
463
153 SF
LACTATION
ROOM
431
125 SF
JANITOR
432
71 SF
ELEC
403
WOMEN
404
HALL
405
PRODUCTION
441
410 SF
MEN
406
HALL
456
HALL
455
PW MANAGER
OFFICE
452
233 SF
PW
ENGINEERING
PLAN CHECK
430A
276 SF
PRINTER/FILE
433
283 SF
STAIR NO. 1
S1-4TH
TRANSPORTATION
OFFICE
467
167 SF
D
UPDN
562 SF
LOBBY
401
ELEV 2
IDF - IT
445
52 SF
PW
TRANSPORTATION
PLAN CHECK -
PUBLIC ACCESS
440A
271 SF
ELEV 1
140 SF
OFFICE
451
132 SF
BREAK
444
C
FE
HALL
454
138 SF
OFFICE
462
TRANSPORT
MGR OFFICE
461
229 SF
TRANSPORTATION
OFFICE
468
149 SF
COORDINATOR
470
68 SF
TRANSPORTATION
469
653 SF
G
B
CONFERENCE
450
347 SF
OPEN OFFICE -
PUBLIC WORKS
411
1920 SF
OPEN OFFICE -
TRANSPORTATION
410
1278 SF
CONFERENCE
460
345 SF
A
FE
FE
FE
FE
A401
1 A401
2 A301
1 A302
1 A303
1 A304
1 2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:35 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A204.dwg© Copyright 2025. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
FOURTH FLOOR PLAN
A204
1SCALE: 3/32" = 1'-0"
FOURTH FLOOR PLAN (FOR REFERENCE ONLY)
N
PLAN NORTH
N
TRUE NORTH
G
F
E
D
UP
C
B
A
A401
1 A401
2 A301
1 A302
1 A303
1 A304
1 12
15' - 1" VIF23' - 8" VIF
3 23' - 6" VIF
4 147' - 11 1/4"
23' - 6" VIF23' - 7" VIF23' - 7" VIF15' - 0 1/4" VIF
5678
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:35 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A205.dwg© Copyright 2025. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
FIFTH FLOOR PLAN
A205
1SCALE: 3/32" = 1'-0"
FIFTH FLOOR PLAN (FOR REFERENCE ONLY)
N
PLAN NORTH
N
TRUE NORTH
H
G
F
E
D
UPDN
C
B
A
A401
1 A401
2 A301
1 A302
1 A303
1 A304
1 12
15' - 1" VIF23' - 8" VIF
3 23' - 6" VIF
4 147' - 11 1/4"
23' - 6" VIF23' - 7" VIF23' - 7" VIF15' - 0 1/4" VIF
5678
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:36 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A206.dwg© Copyright 2025. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
SIXTH FLOOR PLAN
A206
1SCALE: 3/32" = 1'-0"
SIXTH FLOOR PLAN (FOR REFERENCE ONLY)
N
PLAN NORTH
N
TRUE NORTH
T.O. 1ST FLOOR
+0"
T.O. 2ND FLOOR
+14'-8"
T.O. 3RD FLOOR
+28'-4"
T.O. 4TH FLOOR
+41'-0"
T.O. 5TH FLOOR
+53'-8"
T.O. 6TH FLOOR
+66'-4"
T.O. 7TH FLOOR
+79'-0"
T.O. ELEV. MACHINERY FLOOR
+89'-8"
T.O. PENTHOUSE ROOF
+98'-10"
12345678
CITY OF BERKELEY
T.O. BASEMENT FLOOR
-12'-2"
MAX, BUILDING HEIGHT
+101'-10"
A401
1 A401
2 REPLACE EXISTING ALUMINUM
REPLACEMENT WINDOW
NO SCOPE OF WORK FOR ENTRY
OR BASEMENT WINDOWS, TYP.
REPAIR CONCRETE
SPALL PER 4/A505
EXISTING STEEL WINDOW PUNCHED OPENINGS,
SEE 1 AND 2/A502, TYP.
NO SCOPE OF WORK FOR
ROOFTOP WINDOWS OR
CONCRETE, TYP.
(E) STONE CLADDING,
NO SCOPE OF WORK
SHEET NOTES:
1.SURVEY ALL CONCRETE SURFACES INCLUDED WITHIN THE SCOPE OF WORK
FOR DETERIORATION AND DAMAGE, INCLUDING (BUT NOT LIMITED TO) BULGES,
DISPLACEMENTS, DELAMINATIONS, CRACKS, INCIPIENT SPALLS, SPALLS, ABANDONED INSERTS, AND OTHER DETERIORATION OR DAMAGE. EVALUATE
TACTICALLY FOR STABILITY, INCLUDING ACOUSTIC HAMMER SOUNDING FOR DELAMINATIONS. REPAIR PER A504 AND A505 AS APPLICABLE.
2.PERFORM ADHESION TEST ON (E) WALL COATING. PENDING ACCEPTABLE RESULTS, RECOAT WALLS W/ ELASTOMERIC COATING.
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:36 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A301.dwg© Copyright 2024. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
SOUTH ELEVATION
A301
1SCALE: 1/8" = 1'-0"
SOUTH ELEVATION
T.O. 1ST FLOOR
+0"
T.O. 2ND FLOOR
+14'-8"
T.O. 3RD FLOOR
+28'-4"
T.O. 4TH FLOOR
+41'-0"
T.O. 5TH FLOOR
+53'-8"
T.O. 6TH FLOOR
+66'-4"
T.O. 7TH FLOOR
+79'-0"
T.O. ELEV. MACHINERY FLOOR
+89'-8"
T.O. PENTHOUSE ROOF
+98'-10"
ABCDEFGH
T.O. BASEMENT FLOOR
-12'-2"
MAX, BUILDING HEIGHT
+101'-10"
EXISTING INFILLED
OPENING, TYP.
WINDOW REPAIR PER 1/A502, SIM.
EXISTING STEEL WINDOW PUNCHED OPENINGS,
SEE 1 AND 2/A502, TYP.
NO SCOPE OF WORK FOR
ROOFTOP WINDOWS OR
CONCRETE, TYP.
SHEET NOTES:
1.SURVEY ALL CONCRETE SURFACES INCLUDED WITHIN THE SCOPE OF WORK
FOR DETERIORATION AND DAMAGE, INCLUDING (BUT NOT LIMITED TO) BULGES,
DISPLACEMENTS, DELAMINATIONS, CRACKS, INCIPIENT SPALLS, SPALLS, ABANDONED INSERTS, AND OTHER DETERIORATION OR DAMAGE. EVALUATE
TACTICALLY FOR STABILITY, INCLUDING ACOUSTIC HAMMER SOUNDING FOR DELAMINATIONS. REPAIR PER A504 AND A505 AS APPLICABLE.
2.PERFORM ADHESION TEST ON (E) WALL COATING. PENDING ACCEPTABLE RESULTS, RECOAT WALLS W/ ELASTOMERIC COATING.
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:36 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A302.dwg© Copyright 2024. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
EAST ELEVATION
A302
1SCALE: 1/8" = 1'-0"
EAST ELEVATION
A B C D E F G H
T.O. 1ST FLOOR
+0"
T.O. 2ND FLOOR
+14'-8"
T.O. 3RD FLOOR
+28'-4"
T.O. 4TH FLOOR
+41'-0"
T.O. 5TH FLOOR
+53'-8"
T.O. 6TH FLOOR
+66'-4"
T.O. 7TH FLOOR
+79'-0"
T.O. ELEV. MACHINERY FLOOR
+89'-8"
T.O. PENTHOUSE ROOF
+98'-10"
T.O. BASEMENT FLOOR
-12'-2"
MAX, BUILDING HEIGHT
+101'-10"
NO SCOPE OF WORK FOR
ROOFTOP WINDOWS OR
CONCRETE, TYP.
EXISTING STEEL WINDOW PUNCHED OPENINGS,
SEE 1 AND 2/A502, TYP.
EXISTING DUCT
PENETRATIONS. PROVIDE
NEW DUCT SEGMENT AT
WINDOWS WITH FLANGE
SEALED INTO GLAZING
POCKET OF NEW WINDOW.
CONNECT DUCT SEGMENT
TO ADJACENT (E) DUCTS.
EXISTING NOTCHES CUT IN
WINDOW FRAMES. IF WINDOWS
ARE NOT REPLACED, REPAIR
PER 4/A504 OR REPLACE FRAME.
SHEET NOTES:
1.SURVEY ALL CONCRETE SURFACES INCLUDED WITHIN THE SCOPE OF WORK
FOR DETERIORATION AND DAMAGE, INCLUDING (BUT NOT LIMITED TO) BULGES,
DISPLACEMENTS, DELAMINATIONS, CRACKS, INCIPIENT SPALLS, SPALLS, ABANDONED INSERTS, AND OTHER DETERIORATION OR DAMAGE. EVALUATE
TACTICALLY FOR STABILITY, INCLUDING ACOUSTIC HAMMER SOUNDING FOR DELAMINATIONS. REPAIR PER A504 AND A505 AS APPLICABLE.
2.PERFORM ADHESION TEST ON (E) WALL COATING. PENDING ACCEPTABLE RESULTS, RECOAT WALLS W/ ELASTOMERIC COATING.
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:37 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A303.dwg© Copyright 2024. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
WEST ELEVATION
A303
1SCALE: 1/8" = 1'-0"
WEST ELEVATION
1 2 3 4 6 7 8
T.O. 1ST FLOOR
+0"
T.O. 2ND FLOOR
+14'-8"
T.O. 3RD FLOOR
+28'-4"
T.O. 4TH FLOOR
+41'-0"
T.O. 5TH FLOOR
+53'-8"
T.O. 6TH FLOOR
+66'-4"
T.O. 7TH FLOOR
+79'-0"
T.O. ELEV. MACHINERY FLOOR
+89'-8"
T.O. PENTHOUSE ROOF
+98'-10"
T.O. BASEMENT FLOOR
-12'-2"
5 MAX, BUILDING HEIGHT
+101'-10"
REPLACE EXISTING
ALUMINUM REPLACEMENT
WINDOW
CLEAN EXISTING LOUVERS AND
REPLACE EXISTING PERIMETER
SEALANT JOINT, TYP.
EXISTING INFILLED
OPENING, TYP.
EXISTING STEEL WINDOW PUNCHED OPENINGS,
SEE 1 AND 2/A502, TYP.
REPLACE EXISTING
ALUMINUM REPLACEMENT
WINDOW
EXISTING DUCT
PENETRATIONS. PROVIDE
NEW DUCT SEGMENTS AT
WINDOWS WITH FLANGE
SEALED INTO GLAZING
POCKET OF NEW WINDOW.
CONNECT DUCT SEGMENT
TO ADJACENT (E) DUCTS.
WINDOW TYPE G:
REPLACE, PER 1/A502,
SIM.
NO SCOPE OF WORK
FOR ROOFTOP
WINDOWS OR
CONCRETE, TYP.
REPAIR CONCRETE
SPALL PER 2/A505
EXISTING LOUVER
SHEET NOTES:
1.SURVEY ALL CONCRETE SURFACES INCLUDED WITHIN THE SCOPE OF WORK
FOR DETERIORATION AND DAMAGE, INCLUDING (BUT NOT LIMITED TO) BULGES,
DISPLACEMENTS, DELAMINATIONS, CRACKS, INCIPIENT SPALLS, SPALLS, ABANDONED INSERTS, AND OTHER DETERIORATION OR DAMAGE. EVALUATE
TACTICALLY FOR STABILITY, INCLUDING ACOUSTIC HAMMER SOUNDING FOR DELAMINATIONS. REPAIR PER A504 AND A505 AS APPLICABLE.
2.PERFORM ADHESION TEST ON (E) WALL COATING. PENDING ACCEPTABLE RESULTS, RECOAT WALLS W/ ELASTOMERIC COATING.
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:37 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A304.dwg© Copyright 2024. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
NORTH ELEVATION
A304
1SCALE: 1/8" = 1'-0"
NORTH ELEVATION
A
T.O. 1ST FLOOR
+0"
T.O. 2ND FLOOR
+14'-8"
T.O. 3RD FLOOR
+28'-4"
T.O. 4TH FLOOR
+41'-0"
T.O. 5TH FLOOR
+53'-8"
T.O. 6TH FLOOR
+66'-4"
T.O. 7TH FLOOR
+79'-0"
T.O. BASEMENT FLOOR
-12'-2"
A
T.O. 1ST FLOOR
+0"
T.O. 2ND FLOOR
+14'-8"
T.O. 3RD FLOOR
+28'-4"
T.O. 4TH FLOOR
+41'-0"
T.O. 5TH FLOOR
+53'-8"
T.O. 6TH FLOOR
+66'-4"
T.O. 7TH FLOOR
+79'-0"
T.O. BASEMENT FLOOR
-12'-2"
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:38 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A401.dwg© Copyright 2024. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
SECTIONS
A401
2SCALE: 1/8" = 1'-0"
SECTION AT GRIDLINE A BETWN 2 & 3 1SCALE: 1/8" = 1'-0"
SECTION AT GRIDLINE A BETWN 1 & 2
6'-8 1/16"
(E) METAL GRILLE,
TO REMAIN
5'-0 13/16"
8'-1"
5'-078"
2'-10"
5'-078"
6'-8 1/16"
4'-0 9/16"
6'-8 1/16"
3'-478"
4'-1"
3'-478"
WINDOW AWINDOW BWINDOW CWINDOW DWINDOW EWINDOW F
4'-1"
5'-078"
WINDOW G
EXISTING WINDOW SCHEDULE
TYPESIZEFRAME MATERIALGLAZINGTOTAL NO.DETAILSCOMMENTS WIDTHHEIGHTNO. OF LITESTYPE A5'-0 13/16"6'-8 1/16"STEEL5SINGLE PANE1641/A402REPLACE PER WINDOW TYPE AA.
B5'-0 7/8"8'-1"STEEL5SINGLE PANE131/A402REPLACE PER WINDOW TYPE BB.
C5'-0 7/8"2'-10"STEEL1SINGLE PANE41/A402TO REMAIN. REPLACE PERIMETER SEALANT.
D4'-0 9/16"6'-8 1/16"STEEL4SINGLE PANE551/A402REPLACE PER WINDOW TYPE DD.
E3'-0 7/8"6'-8 1/16"STEEL4SINGLE PANE51/A402REPLACE PER WINDOW TYPE EE.
F3'-0 7/8"4'-1"STEEL2SINGLE PANE61/A402REPLACE PER WINDOW TYPE FF.
G5'-0 7/8"4'1"STEEL3SINGLE PANE11/A402REPLACE PER WINDOW TYPE GG.
NEW WINDOW SCHEDULE
TYPESIZEFRAME MATERIALGLAZINGTOTAL NO.DETAILSCOMMENTS WIDTHHEIGHTNO. OF LITESTYPE AA5'-0 13/16"6'-8 1/16"ALUMINUM5IGU1642/A502
BB5'-0 7/8"8'-1"ALUMINUM5IGU13A502 SIM.
DD4'-0 9/16"6'-8 1/16"ALUMINUM4IGU551/A502
EE3'-0 7/8"6'-8 1/16"ALUMINUM4IGU5A502 SIM.
FF3'-0 7/8"4'-1"ALUMINUM2IGU6A502 SIM.
GG5'-0 7/8"4'1"ALUMINUM3IGU1A502 SIM.
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/18/2025 1:47 PM by LeBlanc, Katie File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A402.dwg© Copyright 2025. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
WINDOW SCHEDULE
AND EXISTING
WINDOWS
A402 1SCALE: 1/2" = 1'-0"
EXISTING WINDOW ELEVATIONS
A504
1 A504
2 A504
3 A504
3 O.H.
A501
1A
A501
1B
3'-1112"
6'-95 8"
BPLAN - SECTION
ASECTION
INTERIOR
EXTERIOR
INTERIOR
EXTERIOR
REMOVE (E) SEALANT, REPLACE
WITH (N) FILLET SEALANT, TYP.
ABATE AND REMOVE (E)
PUTTY. REMOVE (E)
GLAZING, SALVAGE, AND
REINSTALL. REPLACE
BROKEN PANES IN-KIND.
INSTALL (N) GLAZING
PUTTY, TYP.
ABATE AND REMOVE (E) COATINGS.
REMOVE (E) CORROSION.
SELECTIVELY REPAIR DETERIORATED
OR DAMAGED SEGMENTS, AS OCCUR,
PER 4/A504 SIM. PRIME WITH
CORROSION INHIBITOR. INSTALL
HIGH-PERFORMANCE COATING, TYP.
COATING TO MATCH EXISTING COLOR.
2516" 2716" 13 8" 1"3'-11116" 1'-23 4"
2116"1'-838"2916"1'-838"2116"
1'-0916"
4"
A504
1 A504
2 A504
3 A504
3 O.H.
A501
2A
A501
2B
4'-1134"
6'-1014"
REMOVE (E) SEALANT, REPLACE
WITH (N) FILLET SEALANT, TYP.
ABATE AND REMOVE (E)
PUTTY. REMOVE (E)
GLAZING, SALVAGE, AND
REINSTALL. REPLACE
BROKEN PANES IN-KIND.
INSTALL (N) GLAZING
PUTTY, TYP.
ABATE AND REMOVE (E)
COATINGS. REMOVE (E)
CORROSION. SELECTIVELY
REPAIR DETERIORATED OR
DAMAGED SEGMENTS, AS
OCCUR, PER 4/A504 SIM.
PRIME WITH CORROSION
INHIBITOR. INSTALL
HIGH-PERFORMANCE
COATING, TYP. COATING TO
MATCH EXISTING COLOR.
BPLAN - SECTION
ASECTION
INTERIOR
EXTERIOR
INTERIOR
EXTERIOR
2116"1'-5316"158"1'-6"158"1'-5316"2116"
1"1'-23 4"13 8"3'-11316"
2716"
1'-0916"2516"
4"
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:38 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A501.dwg© Copyright 2025. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
WINDOW REPAIR
ELEVATIONS
A501
1SCALE: 1 1/2" = 1'-0"
WINDOW ELEVATION 012SCALE: 1 1/2" = 1'-0"
WINDOW ELEVATION 02
A503
4 A503
6 O.H.
A502
1A
A503
5 A502
1B
A503
6 EXTERIOR
11316" 218" 218" 11316"3'-105 8" 1'-11116"1'-03 8"
INTERIOR
4'-0916"
6'-8116"
21116"1'-8"218"1'-8"21116"
INTERIOR
EXTERIOR
REMOVE (E) SEALANT, REPLACE WITH
(N) SEALANT AND BACKER ROD, TYP.
ABATE MATERIALS. REMOVE (E) WINDOW
AND REPLACE WITH NEW THERMALLY
BROKEN ALUMINUM WINDOW WITH
FRAMES TO MATCH (E), TYP.
ASECTION
BPLAN - SECTION
4"
A503
4 A503
6 A503
5 A503
6 O.H.
A502
2A
A502
2B
EXTERIOR
11316" 218" 218" 11316"3'-105 8" 1'-11116"1'-03 8"
INTERIOR
5'-01316"
6'-8116"
ABATE MATERIALS. REMOVE (E)
WINDOW AND REPLACE WITH
NEW THERMALLY BROKEN
ALUMINUM WINDOW WITH
FRAMES TO MATCH (E), TYP.
21116"1'-4516"218"1'-512"218"1'-4516"21116"
INTERIOR
EXTERIOR
ASECTION
BPLAN - SECTION
REMOVE (E) SEALANT,
REPLACE WITH (N) SEALANT
AND BACKER ROD, TYP.
4"
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:38 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A502.dwg© Copyright 2024. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
WINDOW
REPLACEMENT
ELEVATIONS
A502
1SCALE: 1 1/2" = 1'-0"
WINDOW REPLACEMENT ELEVATION 012SCALE: 1 1/2" = 1'-0"
WINDOW REPLACEMENT ELEVATION 02
(E) PARGE COAT
(E) STEEL WINDOW FRAME
(E) PUTTY(N) REPLICA WINDOW WITH
INSULATING GLASS UNIT. MATCH
EXISTING COLOR
REPAIR (E) PARGE AND CONCRETE
CRACKS AND SPALLS, AS OCCUR. MATCH
EXISTING COLOR AND PROFILE
(N) SEALANT AND BACKER ROD (E) FILLET JOINT OF SEALANT
(E) ELASTOMERIC COATING(N) ELASTOMERIC COATING
(E) FASTENER
(E) WINDOW ANCHOR
(E) MORTAR
(E) PARGE COAT
(E) PAINT
(E) STEEL WINDOW FRAME
(E) PUTTY
(E) INTERIOR FINISH, VARIES
(E) PARGE COAT
(N) SEALANT AND BACKER ROD
(N) REPLICA WINDOW WITH
INSULATING GLASS UNIT. MATCH
EXISTING COLOR.
(N) ELASTOMERIC COATING
(E) FILLET JOINT OF SEALANT
REPAIR (E) PARGE AND CONCRETE
CRACKS & SPALLS, AS OCCUR. MATCH
EXISTING COLOR AND PROFILE
(E) STEEL WINDOW FRAME
(E) PUTTY
(E) PARGE COAT
(E) INTERIOR FINISH, VARIES
(E) FASTENER
(E) MORTAR
(E) WINDOW ANCHOR
(E) PAINT
(E) FILLET JOINT OF SEALANT
(N) MORTAR
(N) REPLICA WINDOW WITH
INSULATING GLASS UNIT. MATCH
EXISTING COLOR
REPAIR (E) PARGE AND CONCRETE
CRACKS AND SPALLS, AS OCCUR. MATCH
EXISTING COLOR AND PROFILE
(N) SEALANT AND BACKER ROD
(E) PARGE COAT
(N) ELASTOMERIC COATING
(E) INTERIOR FINISH, VARIES. ABATE, REMOVE &
REINSTALL/REPLACE (E) FINISHES, AS REQUIRED.
(E) PARGE COAT
(N) SEALANT AND BACKER ROD
(N) REPLICA WINDOW WITH
INSULATING GLASS UNIT. MATCH
EXISTING COLOR.
(N) ELASTOMERIC COATING(E) INTERIOR FINISH, VARIES. ABATE, REMOVE & REINSTALL/REPLACE (E) FINISHES, AS REQUIRED.
REPAIR (E) PARGE AND CONCRETE
CRACKS & SPALLS, AS OCCUR. MATCH
EXISTING COLOR AND PROFILE
(E) PARGE COAT
(E) INTERIOR FINISH, VARIES, REMEDIATE AND
REMOVE. REPLACE WITH (N) INTERIOR PLASTER
(N) ELASTOMERIC COATING
(N) SEALANT AND BACKER ROD
(N) STEEL REPLICA WINDOW WITH
INSULATING GLASS UNIT. MATCH
EXISTING COLOR.
REPAIR (E) PARGE AND CONCRETE
CRACKS AND SPALLS, AS OCCUR.
MATCH EXISTING COLOR AND PROFILE
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:39 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A503.dwg© Copyright 2024. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
WINDOW
REPLACEMENT
DETAILS
A503
1SCALE: 6" = 1'-0"
EXISTING SILL
2SCALE: 6" = 1'-0"
EXISTING HEAD
3SCALE: 6" = 1'-0"
EXISTING JAMB
4SCALE: 6" = 1'-0"
REPLACEMENT SILL
5SCALE: 6" = 1'-0"
REPLACEMENT HEAD
6SCALE: 6" = 1'-0"
REPLACEMENT JAMB
(N) FILLET JOINT OF SEALANT
(N) WOOD BLOCKING (E) STEEL WINDOW FRAME,
REMEDIATE AND RECOAT.
MATCH EXISTING COLOR.
(N) PUTTY
REMOVE, SALVAGE, AND
REINSTALL GLAZING
(N) OPERABLE JOCKEY SASH WINDOW
(E) PARGE COAT
(N) ELASTOMERIC COATING
(E) FASTENER REPLACE WITH (N)
STAINLESS STEEL FASTENERS, TYP.
(E) WINDOW ANCHOR RECOAT
(N) WOOD BACKING
(E) INTERIOR FINISH, VARIES. REMEDIATE AND
REMOVE. REPLACE WITH (N) INTERIOR PLASTER.
(N) OPERABLE JOCKEY SASH WINDOW
(E) MORTAR
(E) PARGE COAT
(N) ELASTOMERIC COATING
(E) STEEL WINDOW FRAME,
REMEDIATE AND RECOAT.
MATCH EXISTING COLOR.
(N) PUTTY
REMOVE, SALVAGE, AND
REINSTALL GLAZING
(N) SEALANT JOINT
REMEDIATE PUTTY, REMOVE, SALVAGE, AND REINSTALL
GLAZING
(E) STEEL WINDOW FRAME, RECOAT ALL SURFACES
(N) PUTTY
(N) SEALANT JOINT
(E) PARGE COAT
(N) ELASTOMERIC COATING
(N) OPERABLE JOCKEY SASH WINDOW
(N) WOOD BLOCKING
(E) INTERIOR FINISH, VARIES. REMEDIATE AND REMOVE.
REPLACE WITH (N) INTERIOR PLASTER
(E) FASTENER REPLACE WITH (N) STAINLESS STEEL
FASTENERS
(E) MORTAR REMOVE AND REPLACE
(E) WINDOW ANCHOR RECOAT
REPAIR (E) PARGE AND CONCRETE
CRACKS & SPALLS, AS OCCUR. MATCH
EXISTING COLOR AND PROFILE
CUT OUT DAMAGED PORTION OF
STEEL FRAME, INSTALL NEW STEEL
INTO OPENING, WELD ALL EDGES OF
NEW STEEL TO EXISTING, GRIND
SMOOTH AND RECOAT
B-P1c, TYP.
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:39 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A504.dwg© Copyright 2024. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
WINDOW REPAIR
DETAILS
A504
1SCALE: 6" = 1'-0"
JOCKEY SASH SILL
2SCALE: 6" = 1'-0"
JOCKEY SASH HEAD
3SCALE: 6" = 1'-0"
JOCKEY SASH JAMB
4SCALE: 6" = 1'-0"
PARTIAL MUNTIN REPAIR
CLEAN & COAT EXPOSED
REINF. w/ CORROSION
INHIBITING COATING
VARIES
NOTE:
1.SEE 3/A505 FOR TYPICAL SPALL PATCH REQUIREMENTS.
(E) REINF. BAR,
AS OCCURS
3" TYP
2" MIN
34" MIN
CONCRETE REPAIR
MATERIAL
FACE OF (E) CONC.
(E) PARGE COAT,
AS OCCURS
PARGE REPAIR
MORTAR, SEE 5/A505
1"
MIN.
(N) ELASTOMERIC
COATING
1.SPALL REPAIRS TO BE GENERALLY RECTANGULAR IN SHAPE
WITH NO REENTRANT CORNERS.
2.SPALL REPAIR FINISH, TEXTURE, AND COLOR TO MATCH
ADJACENT CONCRETE.
3.SAW CUT AROUND THE PERIMETER OF THE REPAIR AREAS, DO
NOT OVER RUN CUTS AT CORNERS. SAW CUT DEPTH: 1/2" MIN.
4.CHECK REPAIR AREAS FOR EMBEDDED ITEMS USING
NON-DESTRUCTIVE MEANS BEFORE CUTTING. DO NOT SAW
THROUGH REINFORCING OR OTHER EMBEDDED ITEMS.
5.GRIND OR CHIP SQUARE THE REPAIR AREA EDGES TO
PROVIDE A UNIFORM, STRAIGHT EDGE.
6.REMOVE CONCRETE AS FOLLOWS:
a. ALL UNSOUND MATERIAL
b. A MINIMUM DEPTH OF 2" UNLESS NOTED OTHERWISE.
7.WHERE 50% OR MORE OF EXISTING REINFORCING IS EXPOSED,
CHIP AROUND BAR TO ENCAPSULATE IT ENTIRELY IN THE
SPALL REPAIR, PROVIDE 3/4" MINIMUM CLEAR AROUND BAR.
8.PREPARE SPALL REPAIR SUBSTRATE TO SPECIFIED CONCRETE
SURFACE PROFILE (CSP) 7 OR HIGHER, PER ICRI 310.2R.
9.WHERE VERTICAL AND OVERHEAD SPALL REPAIRS WILL NOT
OTHERWISE CONTAIN ORIGINAL OR SUPPLEMENTAL
REINFORCING, PROVIDE SPALL REPAIR REINFORCING
CONSISTING OF S.S. WELDED WIRE FABRIC AND 1/4" x 2" S.S.
SCREW ANCHORS AT 12" O.C.
10.IF THE EXISTING REINFORCING HAS LESS THAN 1/2" COVER NOTIFY THE ARCHITECT.
11.ADD (N) REINF. BARS TO SUPPLEMENT (E) BARS THAT ARE
DAMAGED.
112"
MIN
2"
MIN
2:1 TAPER
2"
MINxxx
APatch Includes RebarBPatch Does Not Include Rebar
34"
VARIES
VARIES
3" TYP
2" MIN
(E) REINF. BAR,
AS OCCURS TYP
3 4" MIN
34" MIN, TYP
3 4" MIN
FACE OF (E) CONC.
CONCRETE REPAIR
MATERIAL
NOTE:
1.SEE 3/A505 FOR TYPICAL SPALL REPAIR REQUIREMENTS.
CLEAN & COAT EXPOSED
REINF. w/ CORROSION
INHIBITING COATING
(E) PARGE COAT,
AS OCCURS
PARGE REPAIR
MORTAR, SEE 5/A505
1"
MIN.
(N) ELASTOMERIC
COATING
VARIES
34" MIN
VARIES
CLEAN & COAT EXPOSED
REINF. w/ CORROSION
INHIBITING COATING
NOTES:
1.SEE 3/A505 FOR TYPICAL SPALL PATCH REQUIREMENTS.
2.CONFIGURATION VARIES.
(E) REINF. BAR, AS OCCURS
FACE OF (E) CONC.
CONCRETE REPAIR
MATERIAL
PROFILE VARIES, FINISHED PROFILE
MUST REPLICATE ORIGINAL PROFILE
(E) PARGE COAT,
AS OCCURS
PARGE REPAIR
MORTAR, SEE 5/A505
1" MIN.
1" MIN.
(N) ELASTOMERIC COATING
(E) PARGE COAT
(E) CONC SUBSTRATE
REPAIR CRACKS, SPALLS & OTHER
DAMAGE TO SUBSTRATE (AS
OCCURS), & PREPARE SURFACE
PARGE REPAIR MORTAR
VARIES
NOTE:
1.SEE 3/A505 FOR TYPICAL SPALL PATCH REQUIREMENTS.
PATCHES > 1 SQ. FT, ADD: METAL
LATH FASTENED W/ 1/4" x 2" S.S.
SCREW ANCHORS AT 12" O.C.
x
(N) ELASTOMERIC COATING
(E) CRACK
INJECT CRACK WITH EPOXY USING
SURFACE MOUNTED PORTS
USE REMOVABLE SURFACE
SEAL THAT WILL NOT MAR THE
EXISTING SURFACE
PENETRATION:
MIN: 1"
TARGET: 2"-3"
(E) CONCRETE
(N) ELASTOMERIC COATING
(E) PARGE, AS OCCURS
2" 1" 1/2" 0
THIS SHEET PLOTS FULL SIZE
AT 22x34 (INCHES)
Client
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
Date MarkDescription
Project
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC Consultants
Plotted: 4/17/2025 7:40 PM by Watanabe, Jenn File Name: P:\2024\2024.0xxx\2024.0881.0 - 1947 CENTER ST - ENERGY RETROFIT (AJB)\5 Construction Documents\1 Drawings\Sheets\2024_0881_0-A505.dwg© Copyright 2024. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Wiss, Janney, Elstner Associates, Inc. (WJE). WJE disclaims any responsibility for its unauthorized use.
E
D
C
B
A
E
D
C
B
7 7
6 6
5 5
4 4
3 3
2 2
1 A
1 STATE OF CALIFORNIA
L ICENSED
ARCHITECT
ANDREW J. BISHOP
No. C 36411
Exp. 03/31/25
NOT FOR
CONSTRUCTION
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
www.wje.com
HISTORIC STEEL WINDOW
SCHEMATIC DESIGN
1947 CENTER STREET
BERKELEY, CA 94704
NOLL & TAM ARCHITECTS
729 HEINZ AVENUE
BERKELEY, CA 94710
2024.0881.0
18 APRIL 2025
KL/JAW
AJB
As Noted
CONCRETE REPAIR
DETAILS
A505
1SCALE: 3" = 1'-0"
CONCRETE SPALL REPAIR
2SCALE: 3" = 1'-0"
CONCRETE SPALL REPAIR AT CORNER
3SCALE: 3" = 1'-0"
TYPICAL SPALL REPAIR REQUIREMENTS
4SCALE: 3" = 1'-0"
CONCRETE ORNAMENTAL SPALL PATCH
5SCALE: 6" = 1'-0"
PARGE COAT PATCH
6SCALE: 1' = 1'-0"
CRACK INJECTION - PARTIAL PENETRATION
Internal
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: https://berkeleyca.gov/
INFORMATION CALENDAR
June 17, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Terrance Davis, Director, Public Works
Subject: goBerkeley Parking Management Program - Recommended Adjustments for July 20, 2025
INTRODUCTION
This report provides information regarding planned parking rate and time limit adjustments included in the goBerkeley Parking Management Program (goBerkeley parking program). These changes will take effect Sunday, July 20, 2025. On June 20, 2025, City staff will begin to notify the public through updates to the City website, and through coordination with merchant groups in program areas. Please see the rate and time limit adjustments summarized in Attachment 1 of this report.
CURRENT SITUATION AND ITS EFFECTS
The goBerkeley parking program regularly monitors parking conditions in all areas where there is paid parking to ensure a majority of blocks in these areas maintain parking occupancies of 65 to 85 percent, or roughly 1-2 open spaces per block. Paid parking areas in the goBerkeley Parking Program consist of “Premium” and “Value” zones, which are designed to balance demand for parking in and around popular commercial districts by changing rates to increase parking availability. Typically, “Premium” zones feature higher prices and shorter time limits to improve access in high- demand core commercial areas, while peripheral “Value” zones feature lower prices and longer time limits, offering customers the option to park in areas with lower demand for a longer duration.
Since the outset of the program in 2013, staff primarily relied on manual data collection (i.e., counting cars) to understand parking behavior and make program adjustments.
With goBerkeley now citywide, the City contracted with Turnstone Data, Inc. in 2024 to establish a more efficient way to view and analyze parking activity to make informed decisions about parking prices and/or time limits in multiple commercial districts (Resolution No. 71,054-N.S. Contract: Turnstone Data Inc., For Parking Data Analytics Services, September 19, 2023). Turnstone offers multiple ways to visualize, interact with and export parking occupancy data. Turnstone calculates parking occupancy using the supply of parking spaces in a given area, number of paid transactions and advanced prediction that incorporates duration-of-stay and unpaid behavior, such as disabled
goBerkeley Parking Management Program –
Recommended Adjustments for July 20, 2025 INFORMATION CALENDAR June 17, 2025
person placards or intentional violations. Turnstone currently provides similar services in Seattle, Boston and Denver, which, while larger in size, have parking systems with a comparable design to Berkeley.
Notification
Consistent with the Public Works Public Engagement Policy, public outreach for changes to parking rates will be provided as an Information Report to City Council, on a webpage, and via email to affected business associations. The recommended rate changes herein will be posted to the City’s website and emailed to the Fourth Street business association and the Alta Bates Campus prior to the anticipated date of the rate change (July 20, 2025).
Adjustments
Staff used the data gathered by Turnstone Data, Inc. for the purposes of rate adjustments under the goBerkeley parking program. The complete parking occupancy data for the period of January 1, 2025 through March 31, 2025 used to determine rate adjustments is provided in Attachment 2. The following summary presents City staff’s key findings and recommended adjustments in the Fourth Street and Alta Bates areas.
1. Fourth Street
a. Parking Occupancy
i. From January 1, 2025 to March 31, 2025, average parking occupancy in the afternoon (12 p.m. – 6 p.m.) was 101%, which exceeds the program’s target occupancy of 65%-85%. The average morning occupancy was only 54% (morning hours are 9 a.m. – noon); therefore, staff recommends that the hourly rate for this zone be raised during the afternoon period only (12 – 6 p.m.).
Occupancy can exceed 100% when parkers are paying the meter and then leaving earlier than what they paid for, and another parker comes in to occupy and pay for that same spot. Occupancy can also exceed 100% when parkers illegally park in red zones or double-park.
b. Recommended Adjustment
i. Staff recommends increasing the hourly rate from $3.00 per hour to $3.50 per hour in response to the high demand for on-street parking in this area. Increasing the rate by $.50 per hour will increase the likelihood that a driver will find an on-street parking space on the block nearest to their destination.
goBerkeley Parking Management Program –
Recommended Adjustments for July 20, 2025 INFORMATION CALENDAR June 17, 2025
Table 1: Fourth Street Recommended Rate Change
Area Name Area Zone Time of Day Existing
Rate
Proposed
Rate
Change
4th Street Premium Afternoon
(12 – 6 p.m.) $3.00/hour $3.50/hour + $0.50
Note: Per section 14.52.120 of the Berkeley Municipal Code, the City Manager may adjust parking rates by increments no larger than 50 cents ($0.50) per hour.
2. Alta Bates
a. Parking Occupancy
i. From January 1, 2025 to March 31, 2025, average parking occupancy in the afternoon (12 – 6 p.m.) was 105%, which exceeds the program’s target occupancy of 65%-85%. The
average morning occupancy was only 79%, which is on target (morning hours are 9 a.m. – noon). Therefore, staff recommends that the hourly rate for this zone be raised by $.50 per hour during the afternoon period only (12 – 6 p.m.)
b. Recommended Adjustment
i. Staff recommends increasing the hourly rate from $1.50 per hour to $2.00 per hour in response to the high demand for on-street parking in this area. Increasing the rate by $.50 per hour will increase the likelihood that a driver will find an available space in the area on the block nearest to their destination.
Table 2: Alta Bates Recommended Rate Change
Area Name Area Zone Time of Day Existing
Rate
Proposed
Rate
Change
Alta Bates N/A Afternoon
(12 – 6 p.m.)
$1.50/hour $2.00/hour + $0.50
Note: Per section 14.52.120 of the Berkeley Municipal Code, the City Manager may adjust parking rates by increments no larger than 50 cents ($0.50) per hour.
goBerkeley Parking Management Program –
Recommended Adjustments for July 20, 2025 INFORMATION CALENDAR June 17, 2025
BACKGROUND
The City uses parking meters to manage parking demand, particularly in commercial areas where parking availability and turnover are critical for visitor access and convenience. The goBerkeley program consists of a suite of strategies and initiatives designed to improve economic vitality and reduce greenhouse gas emissions. The program features improved parking availability that enhances pedestrian and bicyclist safety by reducing the likelihood of incidents of distracted driving search for parking. In addition, clearer signage and longer on-street parking time limits provide better customer service.
Policy regarding rate and time limit adjustments was established in Resolution No. 67,613-N.S. Update Policies and Fee Schedule for On-Street Parking Meters and Off- Street Parking Facilities Under the goBerkeley Program (adopted July 12, 2016).
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
The goBerkeley Parking Program’s recommended rate adjustments and refined parking management lessen traffic congestion and vehicle emissions, as drivers are anticipated to spend less time searching for available parking spaces. Reducing greenhouse gas emissions produced by vehicular traffic is one of the City’s Climate Action Plan goals.
POSSIBLE FUTURE ACTION
Council could decide to take action regarding the recommended rate adjustments. For example, Council could decide not to implement these recommended rate adjustments, and the City would forego potential additional revenue on blocks that exceed the goBerkeley target occupancy of 65percent to p-85 percent. In addition, these blocks would likely continue to have full or nearly full occupancies that would cause drivers to drive additional blocks searching for on-street parking.
If Council takes no action regarding the recommended rate adjustments, staff will begin public notification on June 20, 2025 through the City website and outreach to business associations. Staff anticipate that these rate adjustments will be implemented on July 20, 2025.
FISCAL IMPACTS OF POSSIBLE FUTURE ACTION
Fiscal impacts are difficult to forecast as parking behaviors resulting from these price adjustments may vary, particularly at on-street meters. Staff anticipate incremental parking revenue from the goBerkeley parking program should continue to be sufficient to cover expected expenditures of the program.
CONTACT PERSON
Wahid Amiri, Deputy Director, Public Works (510) 981-6396 Noah Budnick, Acting Parking Services Manager (510) 981-7069 Elliott Schwimmer, Senior Planner, Public Works (510) 981-7066
goBerkeley Parking Management Program –
Recommended Adjustments for July 20, 2025 INFORMATION CALENDAR June 17, 2025
Attachments:
1: City Council Notification Report
2: Parking Occupancy Maps
Attachment 1: City Council Notification Report
PARKING CHANGES
The following seven tables represent the standard notification requirement for each goBerkeley parking program change.
1. Types of Parking Affected
X ON-STREET METERS __ GARAGES __ LOTS
2. Dates
Date of Proposed Change Date of Previous Change Days/Years Between Change
July 20, 2025 June 2022 (COVID-19
adjustments) Approximately 3 years
3. Areas Affected
Area Name Area Zone Boundaries Map
Fourth
Street
Premium No boundary changes recommended
Alta Bates N/A No boundary changes recommended
See
Attachment
2. 4. Rate Changes
Area Name Area Zone Time of Day Existing
Rate
Proposed
Rate
Change
4th Street Premium Afternoon
(12PM–
6PM)
$3.00/hour $3.50/hour + $0.50
Alta Bates N/A Afternoon
(12PM–
6PM)
$1.50/hour $2.00/hour + $0.50
5. Time Limit Changes
Area Name Area Zone Existing Proposed
Attachment 1: City Council Notification Report
No changes recommended
6. Hours of Operation
Area Name Area Zone Existing Change
No changes recommended
7. Parking Occupancy
Location and Time of Day Occupancy Occupancy Target
4th Street Premium 80% Target
Morning 54% Under
Afternoon 101% Over
4th Street Value 45% Under
Morning 31% Under
Afternoon 55% Under
Adeline/Shattuck Premium 35% Under
Morning 29% Under
Afternoon 40% Under
Adeline/Shattuck Value 56% Under
Morning 52% Under
Afternoon 61% Under
Alta Bates 94% Over
Morning 79% Target
Afternoon 105% Over
Claremont Premium 60% Under
Morning 66% Target
Afternoon 56% Under
Downtown Premium 71% Target
Morning 66% Target
Afternoon 74% Target
Downtown Value 56% Under
Morning 56% Under
Afternoon 56% Under
Elmwood Lot Value 61% Under
Morning 51% Under
Afternoon 68% Target
Attachment 1: City Council Notification Report
Elmwood Premium 70% Target
Morning 61% Under
Afternoon 78% Target
Hearst 2200 Block Premium 62% Under
Morning 64% Under
Afternoon 59% Under
North San Pablo/Gilman Premium 30% Under
Morning 34% Under
Afternoon 27% Under
North San Pablo/Gilman Value 32% Under
Morning 35% Under
Afternoon 30% Under
North Shattuck Premium 65% Under
Morning 60% Under
Afternoon 68% Target
Northside Premium 61% Under
Morning 58% Under
Afternoon 64% Under
Northside Value 59% Under
Morning 59% Under
Afternoon 60% Under
Rockridge Premium 70% Target
Morning 66% Target
Afternoon 73% Target
San Pablo North Value 40% Under
Morning 30% Under
Afternoon 48% Under
San Pablo North/Gilman Premium 31% Under
Morning 32% Under
Afternoon 31% Under
San Pablo North/Gilman Value 25% Under
Morning 28% Under
Afternoon 23% Under
San Pablo South Premium 67% Target
Morning 49% Under
Afternoon 82% Target
San Pablo South Value 47% Under
Morning 46% Under
Attachment 1: City Council Notification Report
Afternoon 47% Under
Solano East Value 31% Under
Morning 25% Under
Afternoon 36% Under
Solano Premium 46% Under
Morning 35% Under
Afternoon 55% Under
Solano West Value 34% Under
Morning 24% Under
Afternoon 42% Under
South Shattuck 50% Under
Morning 43% Under
Afternoon 56% Under
South Telegraph 61% Under
Morning 61% Under
Afternoon 62% Under
Southside Visitor Parking Pilot 51% Under
Morning 51% Under
Afternoon 51% Under
Southside/Telegraph Premium 70% Target
Morning 57% Under
Afternoon 81% Target
Southside/Telegraph Value 56% Under
Morning 46% Under
Afternoon 65% Under
Sports Basement Value 47% Under
Morning 53% Under
Afternoon 43% Under
University Ave Value 48% Under
Morning 47% Under
Afternoon 49% Under
University/San Pablo Premium 60% Under
Morning 52% Under
Afternoon 65% Target
Grand Total 57%
* Occupancy Ranges:
“Under” = 0-64% || “Target” = 65-84% ||
“Over” = 85%+
Average of M, T, W, Th, F, Sa from
January 1, 2025 - March 31, 2025
Attachment 2: Parking Occupancy Maps
4th Street Premium Zone Parking Occupancy, January 1 – January 31, 2025, 12 – 6 p.m.
4th Street Premium Zone Parking Occupancy, February 1 – February 28, 2025, 12 – 6 p.m.
4th Street Premium Zone Parking Occupancy, March 1 – 31, 2025, 12 – 6 p.m.
Alta Bates Zone Parking Occupancy, January 1 – January 31, 2025, 12 – 6 p.m.
Alta Bates Zone Parking Occupancy, February 1 – February 28, 2025, 12 – 6 p.m.
Alta Bates Zone Parking Occupancy, March 1 – 31, 2025, 12 – 6 p.m.
Communications
All communications submitted to the City Council are
public record. Communications are not published directly to the City’s website. Copies of individual communications are available for viewing at the City Clerk Department and through Records Online.
City Clerk Department
2180 Milvia Street
Berkeley, CA 94704
(510) 981-6900
Records Online
https://records.cityofberkeley.info/
To search for communications associated with a particular City Council meeting using Records Online:
1. Select Search Type = “Public – Communication Query (Keywords)”
2. From Date: Enter the date of the Council meeting
3. To Date: Enter the date of the Council meeting (this may match the From Date field)
4. Click the “Search” button
5. Communication packets matching the entered criteria will be returned
6. Click the desired file in the Results column to view the document as a PDF