Telegraph Avenue, between Carleton Street and Parker Street 45% Under 1.5 1.5 Telegraph Avenue, between Derby Street and Carleton Street 45% Under 1.5 1.5 Telegraph Avenue, between Derby Street and Ward Street 44% Under 1.5 1.5 Telegraph Avenue, between Dowling Place and Webster Street 56% Under 1.5 1.5 Telegraph Avenue, between Howe Street and Ashby Avenue 58% Under 1.5 1.5 Telegraph Avenue, between Oregon Street and Russell Street 53% Under 1.5 1.5 Telegraph Avenue, between Oregon Street and Stuart Street 61% Under 1.5 1.5 Telegraph Avenue, between Parker Street and Carleton Street 49% Under 1.5 1.5 Telegraph Avenue, between Prince Street and Dowling Place 57% Under 1.5 1.5 Telegraph Avenue, between Russell Street and Howe Street 50% Under 1.5 1.5 Telegraph Avenue, between Russell Street and Oregon Street 54% Under 1.5 1.5 Telegraph Avenue, between Stuart Street and Derby Street 36% Under 1.5 1.5 Telegraph Avenue, between Stuart Street and Oregon Street 62% Under 1.5 1.5 Telegraph Avenue, between Ward Street and Stuart Street 42% Under 1.5 1.5 Telegraph Avenue, between Webster Street and Ashby Avenue 59% Under 1.5 1.5 Telegraph Avenue, between Webster Street and Prince Street 55% Under 1.5 1.5 Telegraph Avenue, between Woolsey Street and Prince Street 58% Under 1.5 1.5 Telegraph Avenue, ending at Blake Street 68% Target 1.5 1.5 Telegraph Avenue, ending at Dwight Way 71% Target 1.5 1.5 Telegraph Avenue, starting at Parker Street 2% Under 1.5 1.5 Webster Street, between Colby Street and Telegraph Avenue 67% Target 1.5 1.5 Webster Street, between Halcyon Court and Telegraph Avenue 0% Under 1.5 1.5 Webster Street, starting at Telegraph Avenue 34% Under 1.5 1.5 Southside Visitor Parking Pilot 38% Under 2.5 2.5
Channing Way, ending at College Avenue 45% Under 2.5 2.5 Durant Avenue, between College Avenue and Piedmont Avenue 39% Under 2.5 2.5 Durant Avenue, between Piedmont Avenue and College Avenue 43% Under 2.5 2.5 Haste Street, between College Avenue and Piedmont Avenue 36% Under 2.5 2.5 Haste Street, between Piedmont Avenue and College Avenue 46% Under 2.5 2.5 Piedmont Avenue, between Bancroft Way and Durant Avenue 46% Under 2.5 2.5 Piedmont Avenue, between Haste Street and Piedmont Crescent 21% Under 2.5 2.5 Piedmont Avenue, ending at Bancroft Way 44% Under 2.5 2.5 Piedmont Avenue, ending at Haste Street 24% Under 2.5 2.5 Piedmont Avenue, starting at Durant Avenue 39% Under 2.5 2.5

Page 34 of 40 ends
Page 292 ends

Piedmont Avenue, starting at Piedmont Crescent 39% Under 2.5 2.5 Southside/Telegraph Premium 43% Under 3.5 3.5
Bancroft Way, between Bowditch Street and College Avenue 9% Under 3.5 3.5 Bancroft Way, between Dana Street and Telegraph Avenue 11% Under 3.5 3.5 Bancroft Way, between Ellsworth Street and Dana Street 19% Under 3.5 3.5 Bancroft Way, between Fulton Street and Ellsworth Street 10% Under 3.5 3.5 Bancroft Way, between Piedmont Avenue and Fulton Street 16% Under 3.5 3.5 Bancroft Way, between Telegraph Avenue and Bowditch Street 21% Under 3.5 3.5 Bowditch Street, between Durant Avenue and Bancroft Way 50% Under 3.5 3.5 Channing Way, between Bowditch Street and Telegraph Avenue 136% Above 3.5 4 Channing Way, between Telegraph Avenue and Dana Street 67% Target 3.5 3.5 College Avenue, starting at Durant Avenue 41% Under 3.5 3.5 Dana Street, between Channing Way and Durant Avenue 19% Under 3.5 3.5 Dana Street, between Durant Avenue and Bancroft Way 17% Under 3.5 3.5 Dana Street, ending at Durant Avenue 0% Under 3.5 3.5
Durant Avenue, between Bowditch Street and Telegraph Avenue 47% Under 3.5 3.5 Durant Avenue, between Dana Street and Ellsworth Street 50% Under 3.5 3.5 Durant Avenue, between Dana Street and Telegraph Avenue 40% Under 3.5 3.5 Durant Avenue, between Ellsworth Street and Dana Street 41% Under 3.5 3.5 Durant Avenue, between Telegraph Avenue and Bowditch Street 34% Under 3.5 3.5 Durant Avenue, between Telegraph Avenue and Dana Street 55% Under 3.5 3.5 Dwight Way, between Bowditch Street and Regent Street 0% Under 3.5 3.5 Dwight Way, between Dana Street and Telegraph Avenue 77% Target 3.5 3.5 Dwight Way, between Regent Street and Hillegass Avenue 0% Under 3.5 3.5 Dwight Way, between Regent Street and Telegraph Avenue 67% Target 3.5 3.5 Dwight Way, between Telegraph Avenue and Dana Street 74% Target 3.5 3.5 Dwight Way, between Telegraph Avenue and Regent Street 0% Under 3.5 3.5 Fulton Street, between Bancroft Way and Durant Avenue 23% Under 3.5 3.5 Haste Street, between Dana Street and Telegraph Avenue 70% Target 3.5 3.5 Haste Street, between Telegraph Avenue and Dana Street 71% Target 3.5 3.5 Piedmont Avenue, ending at Bancroft Way 41% Under 3.5 3.5 Telegraph Avenue, between Bancroft Way and Durant Avenue 85% Target 3.5 3.5 Telegraph Avenue, between Channing Way and Durant Avenue 54% Under 3.5 3.5 Telegraph Avenue, between Channing Way and Haste Street 66% Target 3.5 3.5

Page 35 of 40 ends
Page 293 ends

Telegraph Avenue, between Durant Avenue and Channing Way 50% Under 3.5 3.5 Telegraph Avenue, between Haste Street and Channing Way 87% Above 3.5 4 Telegraph Avenue, between Haste Street and Dwight Way 70% Target 3.5 3.5 Telegraph Avenue, starting at Durant Avenue 65% Under 3.5 3.5 Southside/Telegraph Value 39% Under 3.25 3.25
Bowditch Street, between Channing Way and Durant Avenue 90% Above 3.25 3.75 Bowditch Street, between Haste Street and Channing Way 35% Under 3.25 3.25 Bowditch Street, ending at Haste Street 0% Under 3.25 3.25 Channing Way, between College Avenue and Bowditch Street 70% Target 3.25 3.25 College Avenue, between Channing Way and Durant Avenue 76% Target 3.25 3.25 College Avenue, between Channing Way and Haste Street 27% Under 3.25 3.25 College Avenue, between Durant Avenue and Channing Way 64% Under 3.25 3.25 College Avenue, between Dwight Way and Haste Street 26% Under 3.25 3.25 College Avenue, between Haste Street and Channing Way 28% Under 3.25 3.25 College Avenue, between Haste Street and Dwight Way 24% Under 3.25 3.25 College Avenue, between Parker Street and Dwight Way 32% Under 3.25 3.25 Durant Avenue, between Bowditch Street and College Avenue 28% Under 3.25 3.25 Durant Avenue, between College Avenue and Bowditch Street 33% Under 3.25 3.25 Dwight Way, between College Avenue and Bowditch Street 46% Under 3.25 3.25 Dwight Way, between Hillegass Avenue and Benvenue Avenue 29% Under 3.25 3.25 Haste Street, between Bowditch Street and College Avenue 22% Under 3.25 3.25 Haste Street, between College Avenue and Bowditch Street 28% Under 3.25 3.25 Sports Basement Value 42% Under 0.5 1.5
Derby Street, between Milvia Street and Shattuck Avenue 41% Under 0.5 1.5 Milvia Street, between Ward Street and Derby Street 45% Under 0.5 1.5 Ward Street, between Adeline Street and Milvia Street 41% Under 0.5 1.5 Telegraph Channing Garage 58% Under 1 1
Telegraph Channing Garage Zone 58% Under 1 1
University Ave Value 40% Under
Acton Street, between Berkeley Way and University Avenue 26% Under 0.5 1.5 Acton Street, between University Avenue and Berkeley Way 3% Under 0.5 1.5 Bonar Street, between Addison Street and University Avenue 52% Under 0.5 1.5 Bonar Street, between University Avenue and Addison Street 50% Under 0.5 1.5 California Street, between Berkeley Way and University Avenue 44% Under 0.5 1.5

Page 36 of 40 ends
Page 294 ends

California Street, between University Avenue and Berkeley Way 51% Under 0.5 1.5 California Street, ending at University Avenue 31% Under 2 2 California Street, starting at University Avenue 0% Under 0.5 1.5 Curtis Street, between Hearst Avenue and University Avenue 19% Under 0.5 1.5 Curtis Street, between University Avenue and Hearst Avenue 35% Under 0.5 1.5 Grant Street, ending at University Avenue 43% Under 0.5 1.5 Grant Street, starting at University Avenue 53% Under 0.5 1.5 University Avenue, between Acton Street and Chestnut Street 32% Under 0.5 1.5 University Avenue, between Acton Street and Sacramento Street 36% Under 0.5 1.5 University Avenue, between Bonar Street and Acton Street 38% Under 0.5 1.5 University Avenue, between California Street and Jefferson Avenue 60% Under 0.5 1.5 University Avenue, between California Street and Sacramento Street 40% Under 0.5 1.5 University Avenue, between Chestnut Street and Curtis Street 33% Under 0.5 1.5 University Avenue, between Curtis Street and Bonar Street 32% Under 0.5 1.5 University Avenue, between Curtis Street and San Pablo Avenue 49% Under 0.5 1.5 University Avenue, between Grant Street and Martin Luther King Junior Way 61% Under 0.5

1.5 University Avenue, between Grant Street and McGee Avenue 54% Under 0.5 1.5 University Avenue, between Jefferson Avenue and McGee Avenue 46% Under 0.5 1.5 University Avenue, between Martin Luther King Junior Way and Grant Street 64% Under 0.5

1.5 University Avenue, between McGee Avenue and California Street 50% Under 0.5 1.5 University Avenue, between McGee Avenue and Grant Street 51% Under 0.5 1.5 University Avenue, between Sacramento Street and Acton Street 30% Under 0.5 1.5 University Avenue, between Sacramento Street and California Street 28% Under 0.5 1.5 University Avenue, between San Pablo Avenue and Curtis Street 44% Under 1 1.5 University/San Pablo Premium 50% Under 1 1.5
Ninth Street, ending at University Avenue 34% Under 1 1.5 Ninth Street, starting at University Avenue 61% Under 1 1.5 San Pablo Avenue, between Addison Street and Allston Way 59% Under 1 1.5 San Pablo Avenue, between Addison Street and University Avenue 70% Target 1 1.5 San Pablo Avenue, between Allston Way and Cowper Street 47% Under 1 1.5 San Pablo Avenue, between Cowper Street and Addison Street 75% Target 1 1.5 San Pablo Avenue, between Hearst Avenue and University Avenue 58% Under 1 1.5 San Pablo Avenue, between University Avenue and Addison Street 77% Target 1 1.5

Page 37 of 40 ends
Page 295 ends

San Pablo Avenue, between University Avenue and Hearst Avenue 38% Under 1 1.5 Tenth Street, between Addison Street and University Avenue 57% Under 1 1.5 Tenth Street, between University Avenue and Hearst Avenue 32% Under 1 1.5 University Avenue, between Eighth Street and Ninth Street 36% Under 1 1.5 University Avenue, between Ninth Street and Eighth Street 36% Under 1 1.5 University Avenue, between Ninth Street and Tenth Street 43% Under 1 1.5 University Avenue, between San Pablo Avenue and Tenth Street 34% Under 1 1.5 University Avenue, between Tenth Street and Ninth Street 32% Under 1 1.5 University Avenue, between Tenth Street and San Pablo Avenue 62% Under 1 1.5 Source: Turnstone Data Analytics, August 1, 2025 - October 31, 2025

Page 38 of 40 ends
Page 296 ends

Attachment 4: Cal Football Game Day Surcharge Meter Map

Page 39 of 40 ends
Page 297 ends

Attachment 5: Proposed Changes to Monthly Garage Parking Permits Location
Existing
No.

Monthly
Permits
Projected
No.

Monthly
Permits
Total
Spaces
Existing
Cost of
Monthly
Permit
Projected
Cost of
Monthly
Permit
Existing
Annual
Revenue
Projected
Annual
Revenue
Total
Additional
Annual
Revenue
Center Street
Garage 123 134 720 $250 $270 $369,000 $434,160 $65,160
Telegraph
Channing
Garage
139 150 420 $170 $190 $283,560 $342,000 $58,440
Oxford Garage 40 49 99 $170 $190 $81,600 $111,720 $30,120 TOTAL 333 1,239 1,239 $734,160 $887,880 $153,720

Page 40 of 40 ends
Page 298 ends

CONSENT CALENDAR
January 27, 2026
To: Honorable Members of the City Council
From: Mayor Adena Ishii
Subject: AC Transit Berkeley Emeryville Inter-Agency Liaison Committee Appointments

RECOMMENDATION
Adopt a resolution appointing Councilmembers Terry Taplin and Cecilia Lunaparra as the liaisons and Councilmember Mark Humbert as the alternate, to the consolidated AC Transit Berkeley Emeryville Inter-Agency Liaison Committee.

BACKGROUND
On October 22, 2025, AC Transit Board of Directors approved the Charter for the Inter-Agency Liaison Committees (ILC), combining Berkeley and Emeryville into one committee. The Mayor’s office received a request from the AC Transit Board of Directors on December 12, 2025 to appoint two Councilmembers and an alternate by the end of January to serve as liaisons on the Berkeley Emeryville ILC.

AC Transit District’s efforts to consolidate the Berkeley and Emeryville Inter-Agency Liaison Committee will set a strong example of how cities and transit agencies can work together to deliver coordinated and responsive public transit. This consolidated committee will reduce duplication, save staff time, and better align our priorities, strengthening communication and problem-solving to benefit residents across the corridor. The attached ILC Charter provides details on the committee’s purpose, structure, roles, and meetings.

FINANCIAL IMPLICATIONS
There are no financial implications to the City of Berkeley.

ENVIRONMENTAL SUSTAINABILITY
There are no adverse effects to the environment.

CONTACT PERSON
Mayor Adena Ishii
510-981-7100

Attachments:

1. Resolution

Page 1 of 8 ends
Page 299 ends

2. AC Transit Charter for Inter-Agency Liaison Committee

RESOLUTION NO. ##,###-N.S.

APPOINTING COUNCILMEMBERS TERRY TAPLIN AND CECILIA LUNAPARRA AS THE

LIAISONS AND COUNCILMEMBER MARK HUMBERT AS AN ALTERNATE TO THE

ALAMEDA CONTRA COSTA TRANSIT DISTRICT BERKELEY EMERYVILLE INTER-AGENCY

LIAISON COMMITTEE (ILC)
WHEREAS, on October 22, 2025, AC Transit Board of Directors approved the Charter for the Inter-Agency Liaison Committees (ILC), combining Berkeley and Emeryville into one committee.

WHEREAS, the Mayor’s office received a request from the AC Transit Board of Directors on December 12, 2025 to appoint two Councilmembers and an alternate by the end of January to serve as liaisons on the Berkeley Emeryville ILC; and
WHEREAS, the AC Transit District Board of Directors’ effort to consolidate the Berkeley and Emeryville Inter-agency Liaison Committee will set a strong example of how cities and transit agencies can work together to deliver coordinated and responsive public transit. This consolidated committee will reduce duplication, save staff time, and better align our priorities, strengthening communication and problem-solving to benefit residents across the corridor. The attached ILC Charter provides details on the committee’s purpose, structure, roles, and meetings.

NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that Councilmembers Terry Taplin and Cecilia Lunaparra are hereby appointed as the City of Berkeley’s liaisons, and Councilmember Mark Humbert as the alternate to the AC Transit Berkeley Emeryville Inter-Agency Liaison Committee for a the term commencing on January 27, 2026 ending January 1, 2027.

Page 2 of 8 ends
Page 300 ends

December 12, 2025

Page 2 ends

1600 Franklin Street  Oakland, CA 94612  TEL (510) 891-7284  FAX (510) 891-4705  www.actransit.org linda
Alameda-Contra Costa Transit District

VIA EMAIL
December 12, 2025
Honorable Sukhdeep Kaur, Mayor
City of Emeryville
1333 Park Avenue
Emeryville, CA 94608
Honorable Adena Ishii, Mayor
City of Berkeley
2180 Milvia Street
Berkeley, CA 94704
Dear Mayors Kaur and Ishii,
On behalf of the AC Transit Board of Directors, I want to thank you for supporƟng the District’s efforts to consolidate the Berkeley and Emeryville Inter-agency Liaison CommiƩees. Your commitment to collaboraƟon sets a strong example of how ciƟes and transit agencies can work together to deliver coordinated and responsive public transit.

This consolidated commiƩee will reduce duplicaƟon, save staff Ɵme, and beƩer align our prioriƟes, strengthening communicaƟon and problem-solving to benefit residents across the corridor. We respecƞully request that the CiƟes of Berkeley and Emeryville each appoint two liaisons from your city councils by January 2026. Once appointments are made, please noƟfy AC Transit’s District Secretary, Linda Nemeroff, at lnemeroff@actransit.org so we can coordinate the commiƩee’s first meeƟng. The aƩached ILC Charter provides details on the commiƩee’s purpose, structure, roles, and meeƟngs. The Charter was approved by the AC Transit Board of Directors on October 22, 2025.

Your willingness to work collaboraƟvely with AC Transit and with one another demonstrates a proacƟve vision for public governance. We are grateful for your engagement and trust, and we look forward to advancing our shared goals for the communiƟes we serve.

Thank you again for your partnership. Please contact me at (510) 891-7171 or [email protected] with any quesƟons.

Sincerely,
Diane Shaw
President, Board of Directors
Board of Directors
Diane Shaw, President
Ward 5
Murphy McCalley, Vice President
Ward 4
Harpreet S. Sandhu
Ward 1
Jean Walsh
Ward 2
Sarah Syed
Ward 3
Anthony C. Silva
Ward 6
Joel B. Young,
Director at Large
Board Officers
Salvador Llamas
General Manager/
Chief Executive Officer
Aimee L. Steele
General Counsel/
Chief Legal Officer
Linda A. Nemeroff
Board Administrative Officer/
District Secretary

Page 3 of 8 ends
Page 301 ends

December 12, 2025

Page 2 ends

1600 Franklin Street  Oakland, CA 94612  TEL (510) 891-7284  FAX (510) 891-4705  www.actransit.org

Enclosure

cc:

Director Jean Walsh, Ward 2, AC Transit
Director Joel Young, At-Large, AC Transit
Salvador Llamas, General Manager, AC Transit
Paul Buddenhagen, City Manager City of Berkeley
LaTanya Bellow, City Manager, City of Berkeley
Mark Helmbrecht, TransportaƟon Manager, City of Berkeley Mohamed Alaoui, Public Works Director, City of Emeryville Ramakrishna Pochiraju, Exec. Director of Planning & Engineering, AC Transit Robert del Rosario, Director of Planning & Service Development, AC Transit

Page 4 of 8 ends
Page 302 ends

AC Transit Inter-agency Liaison Committee (ILC) Charter

Page 1 of 4 ends

1. Overview
The AC Transit Inter-agency Liaison Committees (ILCs) are formal Brown Act committees established by the AC Transit Board of Directors to promote collaborative planning and coordination between AC Transit and its partner jurisdictions or agencies. Each ILC includes elected representatives from AC Transit and the respective partner city or agency.

2. Purpose
The purpose of the ILCs is to improve service planning coordination and strengthen partnerships between AC Transit and part
ner cities or agencies. The ILCs provide a forum for
discussion and collaboration on a range of transit-related topics, including:
• New residential and commercial developments
• Roadway and right-of-way projects
• Service planning, including routes, schedules, and bus stops • Service partnerships (e.g., service to a new development) • Transit corridor projects (e.g., Rapid Bus, Bus Rapid Transit) • Area Service Plans or Comprehensive Operations Analyses • Intermodal connections between transit systems

3. Scope and Authority
ILCs are for
med for collaborative purposes only and do not possess decision-making authority, nor can they bind respective partner city or agency to any particular course of action. Their primary function is to facilitate dialogue, coordination, and alignment on mutual interests and initiatives.

4. Committee Structure

4.1 Participating Committees (Effective January 1, 2026) • City of Berkeley – City of Emeryville / AC Transit ILC • City of Fremont – City of Newark / AC Transit ILC
• BART / AC Transit ILC
• City of Hayward / AC Transit ILC
• City of Alameda / AC Transit ILC

Page 5 of 8 ends
Page 303 ends

AC Transit Inter-agency Liaison Committee (ILC) Charter

Page 2 of 4 ends

• City of Oakland / AC Transit ILC

4.2 Membership
• BART and Oakland ILCs:
o 3 elected representatives from AC Transit
o 3 elected representatives from the partner agency or local jurisdiction • All Other ILCs:
o 2 elected representatives from AC Transit
o 2 elected representatives from each city or partner agency

4.3 Alternates
• Each city or partner agency may appoint at least one (1) and no more than two (2) alternate members.

The appointments outlined in Sections 4.2 and 4.3 shall be selected in accordance with each jurisdiction’s internal rules and procedures concerning appointments.

4.3 Notification
Each partner city or agency shall provide notice to the AC Transit District Secretary’s Office whenever changes in appointments occur.

5. Meetings

5.1 Frequency
• Each ILC shall meet no fewer than two (2) times and no more than three (3) times per calendar year.
• Meetings shall not be held in January, to accommodate appointment cycles. • Additional meetings may be scheduled for urgent or emergency issues if there is consensus from the ILC.
• Staff-level coordination meetings may occur more frequently between formal ILC meetings.

5.2 Duration
• Meetings shall not exceed 90 minutes; however, this time limitation shall not preclude the public from offering public comment at meetings.

5.3 Location

Page 6 of 8 ends
Page 304 ends

AC Transit Inter-agency Liaison Committee (ILC) Charter

Page 3 of 4 ends

• Meetings will be held in the jurisdiction of the partner city or agency, to encourage local public participation.
• Meeting venues shall be accessible to the public and ideally reachable via public transit. • Remote meetings may be held in compliance with the Brown Act, provided there is a physical location available for public access within the partner city or agency’s jurisdiction.

6. Agenda Planning and Management
• Agenda items may be proposed by committee members at prior meetings. • A draft agenda is prepared by staff, with input from both agencies. • Final approval of the agenda rests with the AC Transit General Manager and the AC Transit ILC members.
• The partner city or agency shall approve agenda items following its own internal procedures.

7. Governance and Joint Meetings
• ILCs are Brown Act Committees formed solely for collaborative purposes. • ILCs do not have authority to make binding decisions on behalf of AC Transit or any partner jurisdiction.
• Joint meetings may be scheduled when two ILCs have overlapping concerns or regional alignment.

8. Staff Responsibilities
AC Transit’s Service Development and Planning Department shall coordinate staff support for all IL
C meetings. Key responsibilities include:
• Administrative and logistical coordination
• Taking and maintaining action minutes
• Convening internal staff preparation meetings one month prior to ILC meetings • Collaborating with partner city or agency staff to develop briefings and agenda materials • Reviewing draft agendas with partner agency staff

Page 7 of 8 ends
Page 305 ends

AC Transit Inter-agency Liaison Committee (ILC) Charter

Page 4 of 4 ends

• Publishing agendas through the AC Transit District Secretary’s Office, unless otherwise arranged
• Ensuring compliance with all Brown Act posting and notification requirements

9. Staff Participation
• The AC Transit General Manager and the counterpart executive at the partner agency, or their designees, are encouraged to attend all ILC meetings. • Departmental staff shall attend as needed based on the agenda. • Meeting administration is the responsibility of the Service Development and Planning Department.

10. Public Notification and Compliance
• In compliance with the Brown Act, AC Transit will publish:
o Regular meeting agendas and materials at least 72 hours in advance o Special meeting notices at least 24 hours in advance
• If the partner agency has stricter posting requirements, those timelines will be honored. • Agendas shall be posted:
o At the physical location of the meeting
o In the lobby of AC Transit’s General Office in Oakland o At applicable teleconference locations

11. Amendments
This Charter may be amended by action of the AC Transit Board of Directors.

Page 8 of 8 ends
Page 306 ends

Rashi Kesarwani
Councilmember, District 1

CONSENT CALENDAR
January 27, 2026
TO: Honorable Mayor and Members of the City Council
FROM: Councilmember Rashi Kesarwani (Author), Mayor Adena Ishii (Co-Sponsor)
SUBJECT: Refer to the City Manager to include in the Community Survey a Poll Question about Increasing Sales Tax in the City of Berkeley

RECOMMENDATION
Refer to the City Manager to include in the upcoming community survey for the November 2026 election a question about increasing the sales tax in the City of Berkeley from 10.25 percent to the maximum of 10.75 percent to help address the City’s projected budget deficit of $27 million.

CURRENT SITUATION AND ITS EFFECTS
Currently, the total sales tax rate in the City is 10.25 percent and consists of a combination of state, county, and special district sales tax rates as follows:
● State of California: 6.00%
● Alameda County: 0.25%
● District/Special: 4.00%
● City of Berkeley: 0%
According to our Finance Director Henry Oyekanmi, if Berkeley were to raise its tax rate from 10.25 percent to 10.75 percent, as many other cities in Alameda County have already done, the City would see additional annual sales tax revenue anywhere from $9.3 million (on the conservative end) to as much as $10.3 million–the more likely figure. This additional revenue could be used for general fund purposes, such as retaining staff in our Police and Fire Departments.

Page 1 of 3 ends
Page 307 ends

2 2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7110 ● Fax: (510) 981-7111 E-Mail: [email protected]
Currently, eight cities in Alameda County have a tax rate higher than Berkeley’s

10.25 percent, as shown in Exhibit 1 below.

Exhibit 1: Alameda County Cities with a Higher Sales Tax Rate Than Berkeley City Sales Tax Rate
City of Alameda 10.75%
City of Albany 10.75%
City of Emeryville 10.50%
City of Hayward 10.75%
City of Newark 10.75%
City of Oakland 10.75%
City of San Leandro 10.75%
City of Union City 10.75%
Source: California Department of Tax and Fee Administration1

BACKGROUND
During the April 24, 2025 Budget and Finance Committee, City staff gave a presentation and reported on a projected General Fund deficit of roughly $27 million for the upcoming fiscal year.2 Since that time, the City Council has had several discussions related to the City’s fiscal condition. On June 17, 2025 and September 30, 2025, the City Council referred to the City Manager items to assess the potential for a 2026 ballot measure to help fund capital improvements to our Fire Department facilities and improvements to our recreation and community facilities3 that would address the City’s infrastructure needs. During the December 2, 2025 City Council meeting, the Council provided input and direction to staff on project priorities for a 1 California Department of Tax and Fee Administration: California Sales and Use Tax Rates by City and County, updated as of January 1, 2026: https://cdtfa.ca.gov/formspubs/cdtfa95.pdf 2 April 24, 2025 Budget and Finance Committee, presentation on FY Mid-Biennial Update Preliminary Budget Status: https://berkeleyca.gov/sites/default/files/legislative-body-meeting-attachments/2025- 04-24%20Item%2002%20Presentation%20Preliminary%20FY26%20MB%20Update.pdf 3 June 17, 2025 City Council agenda item #28: “Fire Facility Revenue Measures”:
https://berkeleyca.gov/sites/default/files/documents/2025-06- 17%20Item%2028%20Fire%20Facility%20Revenue%20Measures.pdf, and September 30, 2025 City Council agenda item #11: “Recreation and Community Facility Improvement Measures”:
https://berkeleyca.gov/sites/default/files/documents/2025-09- 30%20Item%2011%20Recreation%20and%20Community%20Facility%20Improvement%20Measures .pdf

Page 2 of 3 ends
Page 308 ends

3 2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7110 ● Fax: (510) 981-7111 E-Mail: [email protected]
potential revenue measure in preparation for a community survey to gauge residents’ interest in such a bond measure.4

RATIONALE FOR RECOMMENDATION
This referral is requesting questions be added to the upcoming community survey related to raising the City’s sales tax as a way of increasing revenue to partially address the City’s significant projected budget deficit. Understanding residents’ interest in a potential sales tax increase will provide needed direction for City Council.

FISCAL IMPACT
The fiscal impact of the referral is minimal and would include only staff time. The community survey has been approved and the City Manager’s office is already in the process of soliciting proposals from qualified firms to execute the survey. This referral is requesting additional questions be added that would gauge residents’ interest in raising the City’s sales tax. The impact of the additional revenue, were a sales tax increase approved by the voters during the November 2026 election, is considerable, as noted above.

ENVIRONMENTAL SUSTAINABILITY
This referral has no significant impact on environmental sustainability.

CONTACT PERSON
Councilmember Rashi Kesarwani, District 1 (510) 981-7110 4 December 2, 2025 Special City Council meeting, agenda item #2: “Discussion Regarding Potential Ballot Measures for the November 3, 2026, General Municipal Election:
https://berkeleyca.gov/sites/default/files/documents/2025-12- 02%20Special%20Item%2002%20Discussion%20Regarding%20Potential%20Ballot.pdf

Page 3 of 3 ends
Page 309 ends
Page 310 ends

Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager

PUBLIC HEARING
January 27, 2026
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Terrance Davis, Director, Public Works
Subject: Implement Residential Preferential Parking (RPP) Program on the 1700 Block of Cedar Street

RECOMMENDATION
Conduct a public hearing and upon its conclusion, adopt a Resolution amending Resolution No. 56,508-N.S. Section 25P by adding a subsection to implement Residential Preferential Parking (RPP) on the north side of Cedar Street, between McGee Avenue and Edith Street (1701-1721 Cedar Street) in RPP Area E.

FISCAL IMPACTS OF RECOMMENDATION
Implementing RPP on this block would require installation of two signs, costing the City approximately $730, including labor.

CURRENT SITUATION AND ITS EFFECTS
Residents of 1701-1721 Cedar Street have submitted a petition to join the RPP Program in RPP Area E. As shown in Attachment 3, the block requesting to opt into the RPP Program is the north side of Cedar Street between McGee Avenue and Edith Street.

In accordance with Berkeley Municipal Code (BMC) Section 14.72.050(A)(1), staff verified that residents submitted signatures on a qualifying petition representing a numerical majority of residentially zoned parcels wishing to “opt-in” to the RPP Program for the street section listed above and in the attached Resolution. Staff verified that at least 75% of the curb parking spaces were occupied during either mid-morning or mid- afternoon observation periods at the location.

The addition of the north side of one block in Area E should have a minimal impact on enforcement capabilities, as RPP restrictions are already in place on the block of Cedar to the east. Each new addition to the RPP Program, however, tends to result in slightly diminished enforcement for all other existing permit areas, due to parking enforcement officers having slightly larger areas to patrol.

Page 1 of 7 ends
Page 311 ends

Implement Residential Preferential Parking (RPP) Program on the PUBLIC HEARING 1500 Block of Virginia Street January 27, 2026

Page 2 ends

BACKGROUND
The RPP Program was instituted in 1980 to:
 Protect Berkeley residential neighborhoods from an influx of non-resident vehicles and related traffic;
 To assure continued quality of life for residents; and  To provide neighborhood parking for residents.

In most areas, the Program limits parking for vehicles not displaying an RPP permit to two hours, and reserves available daytime parking for residents, from 8:00 a.m.-7:00 p.m. Monday through Friday, and on some blocks, Saturday.

The RPP Program allows residents within RPP Program boundaries to petition the City to “opt-in” or “opt-out” of the Program. The process to install RPP controls requires submittal of a petition signed by residents (including tenants of rental properties) of at least 51% of dwellings sited along the affected block, and a parking survey of those blocks that shows at least 75% of available on-street parking spaces are occupied during the mid-morning and mid-afternoon time periods.

The RPP Program is in alignment with Strategic Plan Priorities, advancing our goal to be a customer-focused organization that provides excellent, timely, easily accessible service and information to the community.

ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
Expansion of the RPP Program to include additional blocks is expected to have minimal net environmental impact. While RPP controls may discourage some non-residents from driving to certain blocks to park, they also make parking more convenient for elderly and/or disabled residents.

RATIONALE FOR RECOMMENDATION
Households on the subject block overwhelmingly support including the north side of Cedar Street between McGee Avenue and Edith Street in the RPP Program. Further, residents have met all requirements as set forth in BMC Section 14.72.050(A)(1) to opt this block into the RPP Program.

ALTERNATIVE ACTIONS CONSIDERED
Council may allow unrestricted parking to remain on these streets. However, Council has previously approved the “opting in” of blocks where the requisite number of households signed a petition requesting RPP control, and where the parking utilization exceeds 75%.

CONTACT PERSON
Wahid Amiri, Deputy Director, Public Works, (510) 981-6396 Mark Helmbrecht, Transportation Manager, Public Works, (510) 981-6403 Scott Artis, Parking Services Manager, Public Works, (510) 981-7786

Page 2 of 7 ends
Page 312 ends

Implement Residential Preferential Parking (RPP) Program on the PUBLIC HEARING 1500 Block of Virginia Street January 27, 2026

Page 3 ends

Elliott Schwimmer, Senior Planner, Public Works, (510) 981-7066 Joshua Brett, Assistant Planner, Public Works (510) 981-7064 Attachments:

1. Resolution

2. Map of Street Section Opting Into the RPP Program

3. Public Hearing Notice

Page 3 of 7 ends
Page 313 ends

RESOLUTION NO. ##,###-N.S.

IMPLEMENT RESIDENTIAL PREFERENTIAL PARKING (RPP) PROGRAM ON

CEDAR STREET BETWEEN MCGEE AVENUE AND EDITH STREET
WHEREAS, Berkeley Municipal Code Section 14.72.050.A.1, Designation of a Residential Preferential Parking (RPP) Area, allows residents to petition the City to "opt- in" or "opt-out" of the program and requires submittal of a petition containing signatures of residents of at least 51% of residentially zoned parcels on the affected block; and WHEREAS, residents of at least 51% of the dwellings on the following block has petitioned to “opt-in” to the RPP Program:

1. North side of Cedar Street between McGee Avenue and Edith Street (1701-1721 Cedar Street);
WHEREAS, staff has conducted field observations and determined at least 75% of available on-street parking spaces are occupied during the mid-morning and mid- afternoon time periods; and
WHEREAS, the designation of these blocks as a residential permit parking area will not be detrimental to the peace, morals, comfort and general welfare of persons residing in the area designated; and
WHEREAS, the $730 implementation cost is subject to appropriation in the FY 2026 budget in the General Fund 011 for Transportation Traffic Maintenance.

NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the following subsection of Section 25 of Resolution No. 56,508-N.S. are hereby added to read as follows:

Section 25P CEDAR STREET, north side between McGee Avenue and Edith Street

Page 4 of 7 ends
Page 314 ends
Page 2 ends

NOTICE OF PUBLIC HEARING

BERKELEY CITY COUNCIL

EXTEND RESIDENTIAL PREFERENTIAL PARKING PROGRAM TO
1700 BLOCK OF CEDAR STREET BETWEEN MCGEE AVENUE AND

EDITH STREET
The Department of Public Works is proposing to conduct a public hearing and, if recommendations are approved, adopt a Resolution amending Section 25P of Resolution No. 56,508-N.S. by adding a subsection to extend residential preferential parking on the north side of the 1700 block of Cedar Street between McGee Avenue and Edith Street.

The Residential Preferential Parking (RPP) Program allows for residents to petition the City to "opt-in" or "opt-out" of the Program. Complying with program requirements, residents of the block under consideration for opting into the RPP Program have submitted the qualifying signatures on a petition and also have at least 75% of the curb spaces occupied during the morning and mid-afternoon observation periods. Adding a block within the existing residential study area boundaries through evaluations by an EIR study certified on September 27, 1988, and in accordance with California Environment Quality Act (CEQA) guidelines, are categorically exempt as defined by Section 15.162(c).

The hearing will be held on January 27, 2026, at 6:00 p.m. in the School District Board Room located at 1231 Addison Street, Berkeley, CA 94702.

A copy of the agenda material for this hearing will be available on the City’s website at https://berkeleyca.gov/ as of 5 p.m. on January 15, 2026. Once posted, the agenda for this meeting will include a link for public participation using Zoom video technology, as well as any health and safety requirements for in-person attendance.

For further information, please contact Joshua Brett, Assistant Planner at (510) 981- 7064. Written comments should be mailed or delivered directly to the City Clerk, 2180 Milvia Street, Berkeley, CA 94704, or e-mailed to [email protected] in order to ensure delivery to all Councilmembers and inclusion in the agenda packet.

Communications to the Berkeley City Council are public record and will become part of the City’s electronic records, which are accessible through the City’s website. Please note: e-mail addresses, names, addresses, and other contact information are not required, but if included in any communication to the City Council, will become part of the public record. If you do not want your e-mail address or any other contact information to be made public, you may deliver communications via U.S. Postal Service or in person to the City Clerk. If you do not want your contact information included in the public record, please do not include that information in your communication. Please

Page 5 of 7 ends
Page 315 ends
Page 3 ends

contact the City Clerk at (510) 981-6900 or [email protected] for further information.

Posted by: January 17, 2026 - Pursuant to Berkeley Municipal Code Chapter 14.72 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ I hereby certify that the Notice for this Public Hearing of the Berkeley City Council was posted at the display case located near the walkway in front of the Maudelle Shirek Building, 2134 Martin Luther King Jr. Way, as well as on the City’s website, on January 15, 2026.
__________________________________
Mark Numainville, City Clerk

Page 6 of 7 ends
Page 316 ends

1707
1526
1739
1710 1644
1641
1624
1622
1538
1612
1629
1737
1607
1611
1629
1612
16171615
1633
1707
1668
1611
1608
1517
1623
1612
1632
1623
1807
1522
1613
1631
1535
1610
1531
1535
1616
1627
1628
1631
1518
1537
1619
1639
1508
1624
1525
1519
1631
1620
1718
1511
1533
1636
1619
1633
1540
1533
1635
1527
15421712
1523
1625
1515
1514
1531
1515
1711
1716
1516
1672
1713
1628
1809
1611
1607
1615
1709
1643
1517
1705
1603
1514
1521
1642
1524
1735
1510
1736
1619
1660
1516
1717
1636
1634
1528
1627
1737
1519
1625
1805
1745
1809
1643
1526
1509
1617
1537
1529
1741
1631
1507
1639
1516
1739
1526 1535
1526
1711
1654
1512
1734
1515
1615
1636
1640
1602
1530
1607
1600
1743
1501
1518
1608
1611
1635
1513
1701
1734
1633
1741
1604
1642
1635
1625
1632
1627
1510
1634
1530
1611
1617
1710
1715
1614
1640
1606
1631
1743
1512
1534
1644
1715
1534
1615
1610
1610
1525
1641
1712
1721
1710
1720
1508
1716
1736
1630
1518
1634
1700
1712
1532
1605
1701
1645
1516
1636
1541
1626
1608
1543
1520
1808
1619
1522
1635
1615
1605
1635
1526
1506
1629
1502
1541
1806
1704
1708
1727
1617
1629
1649
1620
1609
1720
1715
1620
1802
1632
1721
1624
1532
1630
1645
1618
1534
1633
1712
1536
1814
1732
1609
1601
1728
17441742
1801 1805
1737
1803
1724
1648
1531
1611
1615
1740
1617
1601
1609
1606
173317291731
CEDAR
MCGEE
GRANT

LINCOLN
JAYNES
EDITH
VINE

COMSTOCK
NORTH
BUENA
EDITH
[
0 100 20050
Meters
Petition Area Map
Eligible Parcels

Page 7 of 7 ends
Page 317 ends
Page 318 ends

Office of the City Manager

PUBLIC HEARING
January 27, 2026
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Scott Ferris, Director, Parks Recreation and Waterfront Subject: Selected Marina Fee Increases

RECOMMENDATION
Conduct a public hearing and upon conclusion, adopt a Resolution approving new fees and increasing current fees for select Marina fees; and rescinding Resolution No. 71,840-N.S. and all amendatory resolutions.

FISCAL IMPACTS OF RECOMMENDATION
The cumulative impact of these fee increases is estimated to add $247,500 in annual revenue to the Marina Fund (Fund 608), which supports Waterfront operations including the Marina, facilities, roads, recreation programs and special events, (see Table 1).

These increases are needed to offset the costs of providing these services and to help ensure the long-term financial sustainability of the Waterfront. As discussed at the Council Budget & Finance Policy Committee meeting on October 28, 2025, the Marina Fund has had operating deficits for several years, and the Council has had to address these shortfalls with a variety of General Fund balancing measures.1 The Marina Fund was buoyed by the passage of the 2024 Parks Tax increase, which shifted more than $1.5M in costs for Waterfront parks and landscaped areas off the Marina Fund.

However, the weak recovery of the regional hotel market since COVID has created significant uncertainty for the Marina Fund’s single largest revenue source, the Doubletree Hotel.

These fee increases are needed as one part of the City’s strategy to balance the Marina Fund in the next budget cycle. Other measures include Waterfront recreation fee increases2, revenue from updated Waterfront leases, and increased berth occupancy at the Marina. If these fees are not adopted, the Marina Fund is likely to generate deficits which will either require additional reductions to address any shortfall or additional General Fund subsidy which may not be feasible given the projected fiscal constraints of the General Fund.
1 See https://berkeleyca.gov/sites/default/files/legislative-body-meeting-attachments/2025-10- 28%20Item%2003%20Marina%20Fund%20Update%20Presentation.pdf 2 See Council report on Recreation Fee Increases, 1/20/26.

Page 1 of 15 ends
Page 319 ends

Selected Marina Fee Increases PUBLIC HEARING
January 27, 2026

Page 2 of 15 ends

Table 1 - Summary of Estimated Annual Increase in Revenue Fee increases
Marina Fund
(608)
Berth Fee increase $148,000
Power Surcharge $43,000
Liveaboard $27,000
Launch Ramp fees $10,000
Waterfront Parking Passes $19,500
TOTAL $247,500

CURRENT SITUATION AND ITS EFFECTS
On June 24, 2025, Council adopted an updated Marina fee (Resolution No. 71,840- N.S.). The City regularly reviews all Marina fees in an effort to keep facilities and infrastructure accessible to the public while accounting for increased costs to deliver those services.  Proposed fee changes described below are proposed to go into effect January 28, 2026, unless otherwise noted.
 Berth Fees are the monthly slip fee for slipholders with a permit to berth. Fees are proposed to increase by 3% for each of the next two years: a 3% increase in FY27, and a 3% increase in FY28. This is to better recover operational costs, while staying competitive with the local market for slips, (see Tables 2 and 3).

Table 2 – Proposed Berth Fees
Length of boat
(in feet)
Current FY26
$/ft
Proposed
FY27
+3%
Proposed
FY28
+3%
20' -21' $8.96 $9.23 $9.51
22' -24' $9.48 $9.76 $10.05
25' -29' $10.66 $10.98 $11.31
30' -39' $11.30 $11.64 $11.99
40' -49' $11.97 $12.33 $12.70
50' -59' $12.69 $13.07 $13.46
60' -69' $13.47 $13.87 $14.29
70' -79' $14.24 $14.67 $15.11
80' -89' $15.09 $15.54 $16.01
90’+ $18.04 $18.58 $19.14
Table 3 - Berth Fee Comparisons (shown for 30’ and 50’ length boats) Marina - 30' Double Finger
San Francisco Marina Small Craft Harbor - West $21.80
Clipper Yacht Harbor (Sausalito) $20.00
Blue Water Yacht Harbor (Sausalito) $19.00
South Beach Harbor (San Francisco) $15.46
San Francisco Marina Small Craft Harbor -EAST $14.00
Emery Cove Yacht Harbor (Emeryville) $13.50

Page 2 of 15 ends
Page 320 ends

Selected Marina Fee Increases PUBLIC HEARING
January 27, 2026

Page 3 of 15 ends

Marina - 30' Double Finger
Berkeley Marina (FY28) $13.19
Berkeley Marina (FY27) $12.80
Berkeley Marina (current) $12.43
AVERAGE $12.42
Safe Harbor Marina Bay Yacht Harbor (Richmond) $12.42
MEDIAN $11.90
Pillar Point Harbor (Half Moon Bay) $11.90
Union Point (Oakland) $11.05
Oyster Point Marina (South San Francisco) $10.57
Grand Marina (Alameda) $10.37
Oakland Yacht Club $10.00
Brisbane Marina $9.52
Coyote Point Marina (San Mateo) $9.30
Vallejo Municipal Marina $8.62
Marina - 50' Double Finger
Blue Water Yacht Harbor (Sausalito) $35.30
Clipper Yacht Harbor (Sausalito) $30.46
San Francisco Marina Small Craft Harbor - West $23.09
South Beach Harbor (San Francisco) $21.76
AVERAGE $16.27
Berkeley Marina (FY28) $14.81
Safe Harbor Marina Bay Yacht Harbor
(Richmond) $14.80
Union Point (Oakland) $14.54
Berkeley Marina (FY27) $14.38
MEDIAN $14.32
Emery Cove Yacht Harbor (Emeryville) $14.25
Grand Marina (Alameda) $14.11
Oakland Yacht Club $14.05
Westpoint Harbor (Redwood City) $14.03
Berkeley Marina (current) $13.96
Pillar Point Harbor (Half Moon Bay) $11.56
Oyster Point Marina (South San Francisco) $10.88
Brisbane Marina $9.52
Vallejo Municipal Marina $8.62

Page 3 of 15 ends
Page 321 ends

Selected Marina Fee Increases PUBLIC HEARING
January 27, 2026

Page 4 of 15 ends

 Power Surcharge: All slip holders on unmetered slips (slips that are not separately metered for power by Pacific Gas and Electric Company) currently pay an additional 0-12% on top of their monthly dockage to partially offset the costs of the electric bills paid by the City for various docks. This fee would add an additional 40% per month to the existing power surcharges for unmetered slips to offset the cost of power.

Slipholders with unmetered power have not been subject to a power fee increase since 2015. This fee would account for a portion of the increased cost of power paid for by the Marina for these unmetered slips. Since the time this fee was established, power costs for the Marina have increased by over 100%. Raising the fee by this much would cause a significant increase to slip fees for unmetered slips, so a 40% increase is being proposed, (see Table 4).

Table 4 – Proposed Power Surcharge
Vessel
Length
Current
Surcharge per
foot, per month
Proposed
Surcharge
+40%
20-21 $0.00
22-24 $0.20 $0.28
25-29 $0.40 $0.56
30-39 $0.60 $0.84
40-49 $0.80 $1.12
50-59 $1.00 $1.40
60-69 $1.20 $1.68
70-79 $1.40 $1.96
80-89 $1.60 $2.24
90+ $1.60 $2.24
 Liveaboard Fees are applied to permits for cruising vessels used as a residence, and thirteen floating homes in the Berkeley Marina. This fee is proposed to increase from $220/month to $270/month. This liveaboard fee increase is in place to offset staff costs of administering this permit, including the liveaboard waitlist. The fee also offsets the additional usage of Marina facilities by a full-time resident at an otherwise recreational facility. Even with the proposed fee increase, Berkeley’s fees are the lowest among neighboring marinas, (see Table 5).

Table 5 – Liveaboard fee comparisons Source: 2025 Bay Area Marina Survey Marina Rate
Blue Water Yacht Harbor (Sausalito) $600 1st person/month, $450 2nd person/month Clipper Yacht Harbor (Sausalito) $594 1st person/month, $297 2nd person/month Westpoint Harbor (Redwood City) $465/month
Oyster Point Marina (S. San Francisco) $473/month
Emery Cove Marina (Emeryville) $440/month
Grand Marina (Alameda) $400/month
Brisbane Marina $400/month

Page 4 of 15 ends
Page 322 ends

Selected Marina Fee Increases PUBLIC HEARING
January 27, 2026

Page 5 of 15 ends

Marina Rate
Oakland Yacht Club $301.25/month
Marina Bay Yacht Harbor (Richmond) $275/month
Berkeley (proposed) $270/month
Berkeley (current) $220/month
 Launch ramp fees are charged for access to the Marina launch ramp and parking lot. The fees are proposed to increase from $17 to $20/day; from $95 to $120/month; and $310 to $400 for a seasonal pass. This fee has not been increased since 2019 and is needed to help offset the costs of maintenance and management of the Launch Ramp facilities. This fee is consistent with local Marinas, (see Table 6).

Table 6 – Launch ramp fee comparisons
Source: 2025 Bay Area Marina Survey
Marina Rate Notes
Loch Lomond Marina (San Rafael) $20/launch $500 annual pass Pillar Point Marina (Half Moon Bay) $20/launch $269 annual pass Berkeley (Proposed) $20/day $120/month
$400/seasonal
Santa Cruz Harbor $18/launch
Marina Bay Yacht Harbor (Richmond) $17/launch $350/year Berkeley (Current) $17/day $105/month
$350/seasonal
Oyster Point Marina (San Mateo) $13/launch $213/year
Coyote Point (San Mateo) $12/launch
 New Customer Discount. Currently, new customers who sign up before September receive two months of free dockage (slip fees) in December and January, along with a $75 gift card to a Berkeley Waterfront business. To improve marketing and simplify implementation of the incentive, this discount is proposed to change to: two months free after the initial two months are paid. This has no fiscal impact but may help recruit new boaters.
 Waterfront Special Event Fees established in 2020 are working well for non- ticketed events. In 2025, $28,722 in fees was received from 11 special events.

The fees and process help external event producers clearly understand the costs of producing events at the Waterfront, facilitate fair and consistent application of the fees, and offset the impact of these events. There are two changes proposed to the existing fees outlined in Table 7 below.
 Ticket fees for gated events would remain at 10% of gross ticket sales, but the calculation would change to match San Francisco’s recently updated method of assessing the fee on gross ticket sales less special event fees.  Concession fees would be reduced from 10% to 3% of gross concession sales, to remain competitive with our neighboring jurisdictions. San Francisco charges

Page 5 of 15 ends
Page 323 ends

Selected Marina Fee Increases PUBLIC HEARING
January 27, 2026

Page 6 of 15 ends

5% of concessions. East Bay Regional Park District charges the greater of $75 or 10% of vendor sales at the event but does not charge ticket fees. Oakland does not charge for ticket or concession fees.

Table 7 – Updates to Select Waterfront Special Event Fees Fee Description Cost
Ticket Fee, for ticket sales at gated events 10% of gross ticket sales less other special event fees (Venue Fees, Additional Fees, and Pass-
Through Fees) or $0, whichever is greater.

Concession Fee, for concessions sold on
site at the event
3% of gross sales for concessions sold on site at
the event
 Additional Waterfront Parking Passes. A new fee of $200 is proposed for additional boater and tenant parking passes to park in Waterfront lots. Each Waterfront business will receive a predetermined number of free passes based on annual revenue and employee need. Additional passes for tenant staff and slipholders may be purchased for $200/pass. The fee is needed to offset costs to maintain Waterfront parking lots and infrastructure.

BACKGROUND
The Marina Fund covers all Waterfront operations including the Marina, landscaping, facilities, parks, roads, recreation programs and special events. Specific examples include the daily maintenance of over 1,000 berths, repairs to docks, pilings and buildings, staffing in Shorebird Nature Center and Adventure playground and the daily administration of what essentially is a “small city”. These costs are paid via revenues from berth fees, special fees, and commercial leases and licenses. Berth fees comprise 46% of all Marina Fund revenue, while all other marina fees combined comprise approximately 9% of Marina Fund revenue.

The proposed fees were brought before the Parks, Recreation & Waterfront Commission on November 12, 2025 at their regular meeting. These fees along with a range of financial alternatives to fiscally stabilize the Marina Fund were presented to the Council Budget & Finance Policy Committee on October 28, 2025.3

ENVIRONMENTAL SUSTAINABILITY
The proposed fee increases will improve the City’s ability to manage and operate the Berkeley Waterfront, where the City provides unique recreational and educational opportunities for the community to engage with and learn about the Bay and local marine environment.
3 See https://berkeleyca.gov/sites/default/files/legislative-body-meeting-attachments/2025-10- 28%20Item%2003%20Marina%20Fund%20Update%20Presentation.pdf

Page 6 of 15 ends
Page 324 ends

Selected Marina Fee Increases PUBLIC HEARING
January 27, 2026

Page 7 of 15 ends

CONTACT PERSON
Scott Ferris, Director, Parks, Recreation & Waterfront 510-981-6711 Attachments:

1. Resolution
Exhibit A: Fee Schedule

2. Notice of Public Hearing

Page 7 of 15 ends
Page 325 ends

RESOLUTION NO. ##,###-N.S.

ESTABLISHING FEES FOR GOODS AND SERVICES PROVIDED AT THE BERKELEY MARINA AND RESCINDING RESOLUTION NO. 71,840-N.S.

WHEREAS, on June 24, 2025, Council adopted the new Marina Fee Schedule (Resolution No. 71,840-N.S.); and
WHEREAS, the City’s costs to operate facilities, provide services and undertake capital improvements at the Berkeley Marina have increased with inflation, rising staff costs, and aging infrastructure; and
WHEREAS, Marina fees are required to offset those costs and the additional revenue will be deposited in the Marina Fund (608); and
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the attached rate structure (Exhibit A) is hereby established for use by the general public for facilities and services at the Berkeley Marina, effective January 28, 2026.

BE IT FURTHER RESOLVED that Resolution No. 71,840-N.S. and all amendatory resolutions are hereby rescinded effective January 27, 2026.

Exhibit A: Fee Schedule

Page 8 of 15 ends
Page 326 ends

Exhibit A: Fee Schedule
Marina Rate Schedule
(effective January 28, 2026, unless otherwise noted)
Berth fee (per foot/month) Surcharge for Unmetered
Power (per foot/month)
Length
of boat
(in feet)
Effective
7/1/26
Effective
7/1/27
Effective
7/1/26
20' -21' $8.96 $9.23 $9.51 $0.00 $0.00
22' -24' $9.48 $9.76 $10.05 $0.20 $0.28
25' -29' $10.66 $10.98 $11.31 $0.40 $0.56
30' -39' $11.30 $11.64 $11.99 $0.60 $0.84
40' -49' $11.97 $12.33 $12.70 $0.80 $1.12
50' -59' $12.69 $13.07 $13.46 $1.00 $1.40
60' -69' $13.47 $13.87 $14.29 $1.20 $1.68
70' -79' $14.24 $14.67 $15.11 $1.40 $1.96
80' -89' $15.09 $15.54 $16.01 $1.60 $2.24
90’+ $18.04 $18.58 $19.14 $1.60 $2.24
Surcharges Base Rate Per Foot
Upwind Berth* 10% added to the base rate
Single Berth (Double Finger Berth) 10% added to the base rate Upwind & Single Berth 20% added to the base rate
Catamaran/ Trimaran/ or End Tie Fees 20% added to the base rate Discounts Base Rate Per Foot
Multiple Berth Discount > 20 30% off Base Berth Rent
Multiple Berth Discount 11-20 20% off Base Berth Rent
Multiple Berth Discount 5-10 10% off Base Berth Rent
Incentive: Referral Discount ** $250 off first month of berth fees Incentive: New Slip Holders*** 2 months free after initial 2 months are paid New Customer Discount No slip fees December & January plus $75 gift card Other Fees Amount
Abandoned Vessel Fee $1,000
Commercial Business Fee - Docks $25/year
Chaining Fee (per occurrence) $120/occurrence
Charter Boat Fee $35/event + $1/person
Dry Storage (22’ length or less) $200/month
Dry Storage (23-27’ length) $220/month
Dry Storage (28-40’ length) $240/month
Dry Storage (40’ length or more) $280/month
Electronic key pass (initial 1-2 keys) $15/key
Electronic key pass (additional keys) $75/key
Group key fee (Organizations) $15/key
Floating Home Sewer Charge – monthly $25/month

Page 9 of 15 ends
Page 327 ends

Other Fees Amount
Food Booth Fee $500/event
Impound Fee $55/day
Insurance – Outdated / Inadequate $75/month
Labor Fees $75/hour
Launch Ramp – Monthly $105/month
Launch Ramp – Seasonal $350 per 6-month period
Launch Ramp – Daily $20/day
Lien Fee $100/occurrence
Limited Access Berth Vessel Length x Rate
Liveaboard Fee – boat (monthly) ++ $270/month
Liveaboard Fee – floating home (monthly) ++ $270/month
Locker Fee $30/month
Merchandise Booth Fee $100/event
Organized Group Use Fees See table below
Registration/Documentation –
Outdated/Inadequate
$75/month
Skiff <20’ length $140/month
Slip Transfer Fee $30/occurrence
Small Scale Ferry Service Fee See table below
Visitor Berth Fees (11 – 30 nights) up to 29’ $.50/ft/night Visitor Berth Fees (11 – 30 nights) 30’-49’ $.60/ft/night Visitor Berth Fees (11 – 30 nights) 50’ or more $.70/ft/night Visitor Berth Fees (10 nights or less) $1/foot/night
Waterfront Parking Fee Hourly $1/hour
Waterfront Parking Fee Daily $6/day
Waterfront Parking Pass Yearly $500/year
Additional Waterfront Parking Pass
(Boaters/Tenants)+
$200/year
Waterfront Rental Areas See table below
Waterfront Special Event Fees See table below.
*Houseboats excepted
**Fee credit offered on first month of slip fees to both a new slip holder (that has not previously held a slip at the Berkeley Marina) and an existing customer who made the referral. ***One time 100% off of two monthly slip fees for a new slip holder (that has not held a slip at the Berkeley Marina in the past 5 years), redeemable after initial 2 months of berth fees paid on time and in full.
+ Additional passes for tenant staff and slipholders beyond baseline allocation. ++ Boaters may apply for a refund of any Liveaboard fee increase that takes effect from FY 2016 onward through the City’s Very Low-Income Refund policy.

Page 10 of 15 ends
Page 328 ends

Organized Group Use Fees
Annual Fee $250/year
Attendance Fee (up to 50 people) $50/day
Small-Scale Ferry Service Fee
Landings
Per Day
Daily Landing
Fee
Landings per
Day
Daily Landing
Fee
1 $14.34 11 $68.83
2 $25.80 12 $70.27
3 $35.84 13 $71.70
4 $44.44 14 $73.15
5 $51.61 15 $74.58
6 $57.35 16 $76.02
7 $61.65 17 $77.46
8 $64.52 18 $78.89
9 $65.96 19 $80.33
10 $67.40 20 $81.77
For each additional SSFS landing in excess of 20 landings, the daily landing fee would increase by $2.88.

Waterfront Rental Areas
Location Fee
Gateway Pier (16,000 sq. ft) $150/4 hours
South Cove Eastern Shoreline (5,000 sq. ft) $150/4 hours Marina Mall (10,500 sq. ft) $150/4 hours
South Cesar Chavez Peninsula (27,000 sq. ft) $150/4 hours

Page 11 of 15 ends
Page 329 ends

Waterfront Special Event Fees
Venue Fee
- 1-99 attendees $350/day
- 100-249 attendees $500/day
- 250-499 attendees $700/day
- 500-999 attendees $1,000/day
- 1000-4999 attendees $5,000/day
- 5000-9999 attendees $10,000/day
- 10,000-14,999 attendees $15,000/day
- Over 15,000 attendees $20,000/day
Additional fees
- Road closure request $500
- Road closure $2,000
- Participant fee (for event w/alcohol) $5/person or $1,000/day* - Exclusive Use Parking $10/space/day
- Attended Parking $20/vehicle less than 17’; $50/vehicle for vehicles and trailers in excess of 17’
- Ticket Fee 10% of gross ticket sales less other
special event fees (venue fee, additional
fees, and pass-through fees) or $0.*
- Concession Fee 3% of gross sales for concessions sold on site at the event
- Event clean up deposit $1,000
Pass-Through Costs
- Operations staff to plan & monitor event
- Parking attendants
- Parks staff to prepare site, inspect after
event, and make any necessary repairs
- Custodial staff
- Signage, rentals, equipment, green waste,
and other goods or services required for the
event.

Actual costs
*Whichever is higher.

Page 12 of 15 ends
Page 330 ends

ATTACHMENT 2

NOTICE OF PUBLIC HEARING

NOTICE OF PUBLIC HEARING

BERKELEY CITY COUNCIL
Marina Fee Increases
Notice is hereby given by the City Council of the City of Berkeley that a public hearing will be conducted by said city council of the City of Berkeley at which time and place all persons may attend and be heard upon the following:

The Department of Parks, Recreation & Waterfront is proposing to increase selected Marina fees, as contained in the attached Marina Fee Schedule and summarized below:

Table 1 - Current vs. Proposed Fees
Fee Current Proposed

1.Berth Fees
Length of
boat
(in feet)
Berth fee
(per
foot/month)
20' -21' $8.96
22' -24' $9.48
25' -29' $10.66
30' -39' $11.30
40' -49' $11.97
50' -59' $12.69
60' -69' $13.47
70' -79' $14.24
80' -89' $15.09
90’+ $18.04
Berth fee (pe
r foot/month)Length
of boat
(in feet)
Effective 7/1/26 Effective 7/1/27
20' -21' $9.23 $9.51
22' -24' $9.76 $10.05
25' -29' $10.98 $11.31
30' -39' $11.64 $11.99
40' -49' $12.33 $12.70
50' -59' $13.07 $13.46
60' -69' $13.87 $14.29
70' -79' $14.67 $15.11
80' -89' $15.54 $16.01
90’+ $18.58 $19.14

2. Surcharge
for Unmetered
Power
Length of
boat
(feet)
Surcharge
(per ft/mo)
20-21 $0.00
22-24 $0.20
25-29 $0.40
30-39 $0.60
40-49 $0.80
50-59 $1.00
60-69 $1.20
70-79 $1.40
Length
of boat
(feet)
Surcharge
(per ft/mo)
20-21 $0.00
22-24 $0.28
25-29 $0.56
30-39 $0.84
40-49 $1.12
50-59 $1.40
60-69 $1.68
70-79 $1.96

Page 13 of 15 ends
Page 331 ends

80-89 $1.60
90+ $1.60
80-89 $2.24
90+ $2.24

3. Liveaboard
Fees (boat and
floating home)
$220/month $270/month

4. Launch
Ramp Fees
$17/day
$105/month
$350/seasonal
$20/day
$120/month
$400/seasonal

5. New
Customer
Discount
100% off of monthly slip fees for
the first December and January
2 months free after initial 2 months are paid

6. Waterfront
Special Event
Fees
Concession
fee
10% of gross
sales including

ticket sales
Ticket fee 10% of gross ticket sales, less
other special event fees or $0,
which
ever is greater.

Concession
fee
3% of gross sales for
concessions sold on site at the
event
The hearing will be held January 27, 2026. in the School District Board Room, 1231 Addison Street.

For further information, please contact Scott Ferris at 510-981-6711.

A copy of the agenda material for this hearing will be available on the City’s website at www.berkeleyca.gov as of January 15, 2026. Once posted, the agenda for this meeting will include a link for public participation using Zoom video technology, as well as any health and safety requirements for in-person attendance.

Written comments should be mailed or delivered directly to the City Clerk, 2180 Milvia Street, Berkeley, CA 94704, in order to ensure delivery to all Councilmembers and inclusion in the agenda packet.

Communications to the Berkeley City Council are public record and will become part of the City’s electronic records, which are accessible through the City’s website. Please note: e-mail addresses, names, addresses, and other contact information are not required, but if included in any communication to the City Council, will become part of the public record.

If you do not want your e-mail address or any other contact information to be made public, you may deliver communications via U.S. Postal Service or in person to the City Clerk. If you do not want your contact information included in the public record, please do not include that information in your communication. Please contact the City Clerk at 981-6900 or [email protected] for further information.

If you challenge the above in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence delivered to the City of Berkeley at, or prior to, the public hearing. Background information concerning this proposal will be available at the City Clerk Department and posted on the City of Berkeley webpage at least 12 days prior to the public hearing.

Page 14 of 15 ends
Page 332 ends

Published: January 9 and January 16, 2026 – The Berkeley Voice Published pursuant to Government Code 6062a
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ I hereby certify that the Notice for this Public Hearing of the Berkeley City Council was posted at the display case located near the walkway in front of the Maudelle Shirek Building, 2134 Martin Luther King Jr. Way, as well as on the City’s website, on January 15, 2026.

Mark Numainville, City Clerk

Page 15 of 15 ends
Page 333 ends
Page 334 ends

Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: https://berkeleyca.gov/

PUBLIC HEARING
January 27, 2026
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Jordan Klein, Director, Planning & Development Department Subject: Zoning Adjustment Board Appeal: 2109 Virginia, Use Permit #ZP2024-0066

RECOMMENDATION
Conduct a public hearing, and upon conclusion adopt a Resolution denying the appeal and affirming the Zoning Adjustment Board (ZAB) decision to approve Use Permit #ZP2024-0066 to demolish a two-story, 4,604-square-foot non-residential building and surface parking lot, and construct an eight-story (89 feet and 4 inches), 112,969 square- foot mixed-use residential building containing 110 dwelling units (including 9 Very Low- Income and 9 Moderate Income Density Bonus qualifying units), 690 square feet of ground-floor commercial space, 109 off-street vehicle parking spaces and 64 bicycle parking spaces, on a 22,513 square foot lot.

SUMMARY
On September 11, 2025, the ZAB approved Use Permit #ZP2024-0066 to demolish the existing two-story, non-residential building and construct an eight-story, mixed-use residential building containing a total of 110 dwelling units, including nine Very Low- Income (VLI) units, nine Moderate Income (MI) units, 690 square feet of ground floor commercial space, 109 vehicle parking spaces, and 64 bicycle parking spaces. The project approval was based on findings that the project would not be detrimental to the general welfare of the City, aligns with the purpose of the zoning district, encourages the use of public transit, and facilitates the construction of affordable housing.

On September 30, 2025, the ZAB’s decision was appealed by neighboring residents, who raised concerns that the approved project would be a detriment to their property and cause impacts related to noise, pollution (air, soil, water), traffic, safety, and shadows. The appeal further states the proposed project lacks adequate labor standards, lacks community input, and does not include enough affordable housing units to justify the height increase from five to eight stories.

FISCAL IMPACTS OF RECOMMENDATION
None.

Page 1 of 432 ends
Page 335 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 2 ends

CURRENT SITUATION AND ITS EFFECTS
On December 14, 2023, the applicant submitted a Preliminary Use Permit application (PLN2023-0091) pursuant to SB 330, thereby vesting rights.

On June 3, 2024, the applicant submitted a Use Permit application (#ZP2024-0066).

On July 3, 2024 the application was deemed complete.

On October 7, 2024, the Landmarks Preservation Commission (LPC) took no action to initiate a Landmark or Structure of Merit designation and recommended that the ZAB approve the demolition.

On May 15, 2025, the Design Review Committee provided a favorable recommendation to the ZAB with recommendations for Final Design Review. Before and shortly after the DRC meeting, staff received three public comment letters.

On July 10, 2025, the City mailed public hearing notices to property owners and occupants within 300 feet of the project site, as well as to interested neighborhood organizations. The City also posted notices at three nearby locations within the neighborhood.

On July 24, 2025, the applicant requested to remove the project from the Action Calendar of the ZAB public hearing. At that public hearing, staff received three public comment letters.

On August 20, 2025, the City received three public comment letters about this project from citizens who attended the North Shattuck community workshop about the Corridors Zoning Update.

On August 28, 2025, the City mailed new public hearing notices to property owners and occupants within 300 feet of the project site, as well as to interested neighborhood organizations. The City also posted notices at three nearby locations within the neighborhood.

On September 11, 2025, the ZAB held a public hearing for the Use Permit and received no additional public comments. See Attachment 3 for the staff report submitted for ZAB consideration. The ZAB voted to approve the project with a 7-0-0-1 vote (Moved Duffy, Second: Gaffney. Ayes: Duffy, Gaffney, Mae Palmatier, Allen, Thompson, Choi, Sanderson; Noes: None; Abstain: None; Absent: Yung).

On September 30, 2025, neighboring residents filed an appeal of the ZAB’s decision.

BACKGROUND

Page 2 of 432 ends
Page 336 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 3 ends

The project site is a rectangular north-south-oriented corner lot located on the northeast corner of Shattuck Avenue and Virginia Street in the North Berkeley neighborhood. It is a 22,513 square foot split-zoned lot consisting of the following zoning districts: North Shattuck Commercial District (C-NS), Restricted Multiple-Family Residential District (R- 2A), and Multi-Family Residential District (R-4).

The project site is surrounded by commercial uses and mixed-use buildings to the north, east, and west. A multi-family residential building is located to the south across Virginia Street. The surrounding buildings are one to three stories in height. Housing types include single-family homes, duplexes, and small apartment buildings, and are mostly located to the northeast. There are existing on-street metered parking spaces along the frontages of Shattuck Avenue and Virginia Street. The property is served by Alameda County Transit buses and is less than one mile from the North Berkeley BART Station and half mile from the Downtown Berkeley BART Station. There are various local shops, restaurants, services, public parks, and the University of California, Berkeley, all within a half mile of the site.

Page 3 of 432 ends
Page 337 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 4 ends

Figure 1. Zoning
The proposed project would demolish the existing two-story commercial building and surface parking lot to construct a 112,969-square-foot mixed-use residential building containing 110 dwelling units (including nine Very Low-Income and nine Moderate Income Density Bonus qualifying units), 690 square feet of ground-floor commercial space and 109 vehicle parking spaces. The proposed project is also providing 7,060 square-feet of usable open space, 64 bicycle parking spaces, and new street trees on Shattuck and Virginia.

The subject site is also identified as a Housing Opportunity Site in the adopted, certified 2023-2031 Housing Element. Due to the site size exceeding 0.5 acres, it was identified as a “High Potential” site for redevelopment of residential uses, with a capacity of 50 dwelling units per acre.

Page 4 of 432 ends
Page 338 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 5 ends

Figure 2: Street View
Figure 3: Site Plan/Ground Floor Plan

Page 5 of 432 ends
Page 339 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 6 ends

Figure 4: Shattuck Avenue Rendering Looking Northeast
Figure 5: South Elevation Facing Virginia Street

Page 6 of 432 ends
Page 340 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 7 ends

Figure 6: West Elevation Facing Shattuck Avenue
Figure 7: East (Interior Side) Elevation Facing Existing Residential

Page 7 of 432 ends
Page 341 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 8 ends

Senate Bill 330 (Housing Crisis Act of 2019) and State Density Bonus Law The proposed project qualifies as a housing development project under SB 330 and is requesting a density bonus under the State Density Bonus Law. The total density bonus is calculated based on the site’s base density and the allowable bonus granted for providing affordable housing. The base density reflects the maximum number of units allowed on the site while fully complying with applicable district development standards, including height, setbacks, usable open space, and parking requirements. The density bonus is then determined by the percentage of total units dedicated as affordable and their affordability level. For this site, the base density is 55 units. By proposing nine very low-income (VLI) units,15% of the total base units, and nine moderate income (MI) units, 15% of the total base units, the project qualifies for a 100% density bonus, increasing the maximum allowable density to 110 units. (See Table 1: Density Bonus) Table 1: Density Bonus
Base Project Units a Qualifying Units
Percent
Density
Bonus
Number of
Density Bonus
Units a
Proposed
Project Units a
55 9 VLI Units (15%
of base project)
9 MI Units (15% of
base project)
100% 55
(100% of 55 units) 110
Notes:
a. Pursuant to Government Code 65915(q), all unit calculations are rounded up to the nearest whole number.

The proposed project is entitled to three concessions or incentives under Government Code Section 65915(d), as well as an unlimited number of development standard waivers under Government Code Section 65915(e). The applicant is requesting two concessions for the project as follows:
 Public Art In-lieu Fee. A Concession from BMC Chapter 23.316 “Percentage for Public Art on Private Projects” to allow an exemption from the in-lieu fee; and
 On-Grade Parking. A Concession to relocate the underground parking in the base project to an on-grade podium structure in the proposed project.

The applicant is requesting 11 waivers from the following development standards:

North Shattuck Commercial District (C-NS):
 Main Building Height. Waiver from BMC Section 23.204.090(D)(1) “Basic Development Standards” for a mixed-use project to exceed the 35-foot maximum

Page 8 of 432 ends
Page 342 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 9 ends

height limit by adding 54 feet, 4 inches, for a total of 89 feet, 4 inches, and exceed the 3-story limit by adding 5 stories, for a total of 8 stories.  Residential Window Setback. Waiver from BMC Section 23.204.090(D)(4) “Residential Window Setback” to reduce the setback for a Mixed-Use building, opposite a required window in any habitable room of a residential use, to 0 feet, 0 inches where 10 feet is required.
 Interior Side Setback. Waiver from BMC Section 23.304.030(C)(2) “Lots Adjacent to Residential Districts” to reduce the interior side setback to 0 feet, 0 inches for the interior side where 5 feet is required.
 Parking. Waiver from BMC Section 23.322.070(D)(1) “Excess Off-Street Parking” to exceed the maximum number of off-street residential parking.

Restricted Multiple Family Residential District (R-2A):
 Main Building Height. Waiver from BMC Section 23.202.090(D)(1) “Basic Development Standards” to exceed the 35-foot maximum by adding 54 feet, 4 inches for a total of 89 feet, 4 inches, and exceed the 3-story limit by adding 5 stories, for a total of 8 stories.
 Lot Coverage. Waiver from BMC Section 23.202.090(D)(2) “Supplemental Development Standards” to exceed the 40% lot coverage limit for a 3-story building on a corner lot by adding 60% for a total of 100% lot coverage.  Interior Side Setback. Waiver from BMC Section 23.202.090(D)(1) “Basic Development Standards” to reduce the interior side setback to 0 feet, 0 inches on the first and second story where 4 feet is required.

Multi-Family Residential District (R-4):
 Main Building Height. Waiver from BMC Section 23.202.110(E)(1) “Basic Development Standards” to exceed the 65-foot maximum height by adding 24 feet, 4 inches for a total of 89 feet, 4 inches and exceed the 6-story limit by adding 2 stories, for a total of 8 stories.
 Lot Coverage. Waiver from BMC Section 23.202.110(E)(2) “Supplemental Development Standards” to exceed the 40% lot coverage limit for a 6-story building on a corner lot in by adding 60% for a total of 100% lot coverage.  Front Setback. Waiver from BMC Section 23.202.110(E)(1) “Basic Development Standards” to reduce the front setback to 2 feet, 10 inches on the

Page 9 of 432 ends
Page 343 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 10 ends

western side of the lot and 5 feet, 8 inches on the eastern side of the lot where 15 feet is required.

Multi-Family Residential District (R-4) cont’d:
 Interior Side Setback. Waiver from BMC Section 23.202.110(E)(1) “Basic Development Standards” to reduce the interior side setback to 0 feet, 0 inches for stories 1-2 where 4 feet is required, and provide a 9 foot, 8-inch setback for 3-8 stories, where:
o 6 feet is required for the third story,
o 8 feet is required for the fourth story,
o 10 feet is required for the fifth story, and
o 12 feet is required for the sixth story.

The waivers are requested because they are necessary to physically accommodate the additional 18 units as allowed under the State Density Bonus Law.

The City may only deny the waivers if it finds that the waivers would have a specific adverse impact upon public health and safety, or the physical environment, or on any real property listed in the California Register of Historical Resources, and there is no feasible method to satisfactorily mitigate or avoid the specific adverse impact without rendering the development unaffordable to low-income, very-low income, and moderate-income households, or if the waiver would be contrary to State or Federal law.

In addition, the project is subject to the Permit Streamlining Act (Chapter 4.5, beginning with Section 65920), which limits the number of public hearings to no more than five.

The January 27, 2026 City Council hearing represents the fourth public hearing for the proposed project since the project was deemed complete.

RATIONALE FOR RECOMMENDATION
The issues raised in the appellant’s letter (Attachment 2) and staff’s responses are detailed below. For the sake of brevity, the appeal issues are not re-stated in their entirety.

Issue 1: The appellants argue that construction activities would create noise, dust, and vibration that would disrupt nearby households, and they are requesting mitigation measures to reduce these impacts. In addition, they are requesting mitigation to nearby creeks and aquifers, additional soil testing due to the site’s past use as a dry cleaner, measures to protect community health from exposure to hazardous substances, and written disclosures to future tenants regarding soil or groundwater monitoring and any health risks associated with the site.

Page 10 of 432 ends
Page 344 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 11 ends

Response: The Conditions of Approval include several conditions to mitigate the construction impacts mentioned. See Conditions number 17, 21, 23, 24C, 24D, 24E, 44-

46. No creek or culvert, as defined by BMC Chapter 17.08, exists on or within 30 feet of the project site.

Due to its previous use as a dry cleaner, the site was remediated under the oversight of the DTSC in 1987 and assessed by the San Francisco Bay Regional Water Quality Control Board (RWQCB) in 1999. The applicant submitted Phase I and II reports, which were preliminarily reviewed by the City of Berkeley’s Toxics Division and subsequently by LSA Consultants to prepare an environmental checklist in accordance with CEQA Section 15183.3 (“Streamlining for Infill Projects”) and 15162 (“Subsequent EIRs and Negative Declarations”). The Phase I ESA identified a past contamination issue, so a Phase II ESA was subsequently prepared. The Phase II ESA found that any remaining soil or groundwater impacts are minimal and consistent with the conditions described in the case closure letters granted by the DTSC in 1987 and the San Francisco Bay RWQCB in 1999. Because no land use restrictions or continuing obligations were required by DTSC and the San Francisco Bay RWQCB, the Phase II ESA concluded that no further assessment or regulatory oversight is necessary. The CEQA analysis found that the project would not have significant environmental effects that have not already been analyzed in the Housing Element EIR or that are more significant than those previously analyzed.

Issue 2: The appellants argue that the project should be conditioned to use union labor, ensuring fair wages, safety protections, and higher construction quality.

Response: The project was vested on December 27, 2023 under the Housing Crisis Act of 2019. This vesting date is prior to the January 1, 2024 effective date of the Hard Hats ordinance (BMC Chapter 13.107). Therefore, a Condition of Approval cannot be retroactively applied to the project.

Issue 3: The appellants argue that parking will overflow into nearby streets, worsening the existing shortage. They also claim the location of the parking entrance will increase congestion on Shattuck Avenue and pose safety risks for pedestrians and cyclists.

Response: The project provides 109 off-street parking spaces, nearly double the amount typically required near transit (55 maximum), helping to minimize neighborhood spillover given the site's proximity to transit and commercial areas. Also, the project is not eligible for the Residential Permit Parking program, (RPP) and new residents would not be able to secure the existing permits for on-street residential parking that serve the neighborhood. The site is well-served by BART and AC Transit and includes transit incentives and unbundled parking (see Condition number 63), which encourage reduced car ownership and use.

Page 11 of 432 ends
Page 345 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 12 ends

The parking entrance on Shattuck Avenue reuses an existing curb cut and is consistent with existing commercial access patterns. Placing the entrance on Virginia Street would have required major excavation due to the slope of the lot. The project includes streetscape improvements, such as a corner bulb-out with seating and new street trees, which enhance pedestrian safety and visibility.

Issue 4: The appellants claim that the number of units and parking spaces will lead to operational impacts, including noise and increased traffic from deliveries, rideshare pickups, and service vehicles.

Response: The project includes standard Conditions of Approval to manage operational impacts such as noise and traffic. These include:

Noise Reduction Measures: HVAC systems must meet City noise standards, and interior noise levels must comply with residential limits (Condition 27–28).

Transportation Demand Management (TDM): Residents receive transit benefits and real-time transit info (Condition 63), reducing reliance on rideshare and personal vehicles.

Loading Zone and Designated Areas: The ground floor includes a loading zone to accommodate deliveries and service vehicles, minimizing disruption to surrounding streets.

Unbundled Parking: Parking spaces are leased separately from units, discouraging excess vehicle ownership.

No significant operational impacts were identified in the CEQA analysis, and the project complies with all applicable zoning and environmental standards.

Issue 5: The appellants claim the project increased from 5 to 8 stories without clear public notice or sufficient community input. They request stronger affordability commitments in exchange for the added height and ask for transparency on how the density bonus was calculated, which concessions and waivers were granted, and how the City ensures that concessions result in real community benefit.

Response: Public outreach for the project included a neighborhood meeting, mailed notices, posted signage, and multiple public hearings, as outlined in the ZAB staff report. The increase to 8 stories complies with State Density Bonus Law, which allows additional height in exchange for affordable housing. The project includes 18 below- market-rate units (nine Very Low-Income and nine Moderate-Income), qualifying for a 100% density bonus. The ZAB staff report explains how the bonus was calculated and lists the concessions and waivers requested. All of this information was presented at the ZAB public hearing. Per Government Code Section 65915(k), concessions granted

Page 12 of 432 ends
Page 346 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 13 ends

under the State Density Bonus Law are intended to support affordable housing and do not require the provision of community benefits.

Issue 6: The appellants claim the proposed project would create shade and privacy impacts for the adjacent homes.

Response: The applicant submitted shadow studies illustrating the shadows cast by the project at three times of day during the summer and winter solstices. The studies indicate new shadows would fall on the following nearby residences:
 Winter (2 hours before sunset): 1624, 1628, 1632, 1634, 1636, and 1640 Walnut Street, located to the northeast and east of the project site.  Summer (2 hours before sunset): 1634, 1636, and 1640 Walnut Street, located to east of the project site.

While the project would introduce new shadows on neighboring properties, these impacts would be limited in duration and extent and affect only portions of the buildings for a few hours of the day, only during certain times of the year. Such impacts are typical in a built urban environment and are not considered detrimental to the surrounding residential uses.

To address privacy, the proposed project steps back above the podium level on the north and east sides and incorporates trees and planters to minimize privacy impacts.

The step back is maintained for all upper stories of the building.

Issue 7: The appellants raise concerns about emergency preparedness and infrastructure impacts. They cite the site’s seismic risk and deep excavation for the 8-story building as potential safety issues, and request details on fire protection and emergency access. They also note increased demand on police and fire services, loss of trees and green space, and claim the project’s impact on utilities and infrastructure hasn’t been fully addressed.

Response: The project site is not located within a designated seismic hazard zone for landslides, liquefaction, or fault rupture, according to the State Seismic Hazard Zones map. Therefore, no additional geotechnical mitigation is required beyond standard building code compliance. The project is subject to standard Conditions of Approval requiring compliance with all applicable fire and building codes. These include installation of fire sprinklers to meet the 2025 Building and Fire Codes, emergency access provisions, and evacuation planning, which will be reviewed during the building permit process. The CEQA analysis did not identify any significant impacts on police, fire, or ambulance services beyond those already addressed in the Housing Element EIR. The project is consistent with planned residential growth and infrastructure capacity and includes new street trees and landscaping improvements to offset the

Page 13 of 432 ends
Page 347 ends

ZAB Appeal: 2109 Virginia Street, Use Permit ZP2024-0066 PUBLIC HEARING January 27, 2026

Page 14 ends

removal of existing vegetation. These features enhance the pedestrian environment and contribute to the urban canopy. The project is located in a fully developed urban area with existing utility connections. No new or more severe infrastructure impacts were identified in the CEQA consistency analysis.

ALTERNATIVE ACTIONS CONSIDERED
Pursuant to BMC Section 23.410.040(G), the Council may (1) continue the public hearing, (2) reverse, affirm, or modify the ZAB’s decision, or (3) remand the matter to the ZAB.

ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
The project approved by the ZAB is compliant with all applicable State and local environmental requirements, would be located in a transit-rich area, and would be built and operated according to current codes for energy conservation, waste reduction, and water conservation.

The proposed project is categorically exempt from the provisions pursuant to CEQA Guidelines Section 15183.3 (“Streamlining for Infill Projects”). An environmental checklist was prepared for the project in accordance with CEQA Sections 15183.3 and 15162, utilizing the Housing Element’s Environmental Impact Report (EIR, SCH#2010032073) for a consistency analysis. The analysis concluded that the proposed project would not result in any new impacts that would require additional mitigation measures beyond those required by the Housing Element EIR.

CONTACT PERSON
Jordan Klein, Director, Planning & Development Department, (510) 981-7534 Anne Hersch, Land Use Planning Manager, (510) 981-7411
Singeh Saliki, Senior Planner, (510) 981-7412
Attachments:
1: Draft Resolution
Exhibit A: Findings and Conditions, September 11, 2025
Exhibit B: Project Plans, received July 9, 2025
2: ZAB Decision Appeal Letter, received September 30, 2025 3: ZAB Packet (staff report and attachments), dated September 11, 2025 4: Public Hearing Notice
5: Index to Administrative Record
6: Administrative Record

Page 14 of 432 ends
Page 348 ends

RESOLUTION NO. ##,###-N.S.

DENY THE APPEAL AND AFFIRM THE ZONING ADJUSTMENT BOARD DECISION TO APPROVE USE PERMIT #ZP2024-0066 TO DEMOLISH A TWO-STORY, 4,604-

SQUARE-FOOT NON-RESIDENTIAL BUILDING AND SURFACE PARKING LOT, AND CONSTRUCT AN EIGHT-STORY (89 FEET AND 4 INCHES) 112,969 SQUARE-FOOT MIXED-USE RESIDENTIAL BUILDING CONTAINING 110 DWELLING UNITS (INCLUDING 9 VERY LOW-INCOME AND 9 MODERATE INCOME DENSITY BONUS QUALIFYING UNITS), 690 SQUARE FEET OF GROUND-FLOOR COMMERCIAL SPACE, 109 OFF-STREET VEHICLE PARKING SPACES AND 64 BICYCLE PARKING SPACES.

WHEREAS, on December 14, 2023, the City received an SB330 Preliminary Use Permit application (PLN2023-0091); and
WHEREAS, on December 27, 2023, the SB 330 Preliminary Use Permit application (PLN2023-0091) was deemed complete; and
WHEREAS, on June 3, 2024, Isaiah Stackhouse (“applicant”) submitted a Use Permit Application (ZP2024-0066) to demolish a two-story, 4,604-square-foot non-residential building and surface parking lot, and construct an eight-story (89 feet and 4 inches) 112,969 square-foot mixed-use residential building containing 110 dwelling units (including nine Very Low-Income and nine Moderate Income Density Bonus qualifying units), 690 square feet of ground-floor commercial space, 109 off-street vehicle parking spaces and 64 bicycle parking spaces; and
WHEREAS, on July 3, 2024, the Use Permit application (ZP2024-0066) was deemed complete; and
WHEREAS, on October 7, 2024, the Landmarks Preservation Commission (LPC) reviewed the demolition referral; and
WHEREAS, on May 15, 2025, the Design Review Committee conducted preliminary review and provided a favorable recommendation with suggested refinements; and WHEREAS, on July 10, 2025, the City mailed public hearing notices to all adjacent property owners and occupants within 300 feet of the subject property, and to interested neighborhood organizations. Staff also posted the Notice of Public Hearing at three locations within the immediate vicinity of the subject site; and WHEREAS, on July 24, 2025, the applicant requested to remove the project from the Action Calendar of the ZAB public hearing; and
WHEREAS, on August 28, 2025, the City mailed new public hearing notices to all adjacent property owners and occupants within 300 feet of the subject property, and to interested

Page 15 of 432 ends
Page 349 ends

neighborhood organizations. Staff also posted the Notice of Public Hearing at three locations within the immediate vicinity of the subject site; and WHEREAS, on September 11, 2025, the ZAB conducted a public hearing for the Use Permit application (ZP2024-0066). After considering the staff report, the administrative record, and hearing comments from staff, the applicant, and the members of the public, the ZAB approved the project by a vote of 7-0-0-1; and
WHEREAS, on September 30, 2025, neighbors of the proposed project (“appellants”) submitted an appeal of the ZAB decision to the City Clerk; and WHEREAS, on or before January 13, 2026, staff posted the public hearing notice at the site and three nearby locations, and mailed notices to property owners and occupants within 300 feet of the project site, and to all registered neighborhood groups that cover this area. The Council must conduct a public hearing to resolve the appeal; and WHEREAS, on January 27, 2026, the Council held a public hearing to consider the ZAB’s decision, and in the opinion of this Council, the facts stated in, or ascertainable from the public record, including the staff report and comments made at the public hearing, warrant approving the project.

NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Berkeley hereby affirms the decision made by ZAB to approve a Use Permit #ZP2024-0066; adopts the Findings and Conditions of Approval in Exhibit A; and adopts the project plans in Exhibit B.

Exhibits
A: Findings and Conditions, September 11, 2025
B: Project Plans, received July 9, 2025
Commented [SS1]: SS to update

Page 16 of 432 ends
Page 350 ends

Zoning Adjustments Board Findings
Project Facts Project Description:

Applicant: Isaiah Stackhouse. Stackhouse,
De La Pena, Trachtenberg Architects
Property Owner: American
Commonwealth Associates
Project Address: 2109 Virginia Street/1685
Shattuck Avenue
GP Land Use:

Neighborhood Commercial (NC),
Medium Density Residential (MDR),
High Density Residential (HDR)
Zoning:

North Shattuck Commercial (C-NS),
Restricted Multiple-Family Residential
District (R-2A), Multi-Family Residential
District (R-4)
Site Size: .51 acres
CEQA: Exempt pursuant to Section 15183.3
(“Streamlining for Infill Projects”)
Vesting Date: December 27, 2023
Date Deemed Complete: July 23, 2024
Project Planner: Singeh Saliki
The applicant is seeking approval to demolish a 2 -story commercial building (4,604 square feet) and surface parking lot, and construct an 8- story (89 feet and 4 inches ) 112,969 square-foot mixed-use residential development with 110 dwelling units (including 9 Very Low-Income and 9 Moderate Income units), 690 square feet of ground floor commercial space, 109 off -street vehicle parking sp aces and 64 bicycle parking spaces.

Permits Requested:

1. Demolition. Use Permit under BMC Section 23.326.070(A) “Main Non- Residential Building” to demolish a non- residential building

2. New Construction. Use Permit under BMC Section 23.202.020 (A) “Allowed Land Uses” to construct a new mixed -use development.

3. New Construction. Use Permit under BMC Section 23.204.020 (A) “Allowed Land Uses” to construct a new mixed -use development.

4. New Floor Area. Use Permit under BMC Section 23.204.030(A)(1) “Floor Area Permit Requirements” to create new floor area of 2,000 square feet or more.

5. Building Height. Administrative Use Permit under BMC Section

23.304.050(A) “P rojections Above Height Limits” to exceed the allowed height limit with a rooftop projection
Waivers Concessions

1. Building Height

2. Residential Window Setback

3. Parking

4. Lot Coverage

5. Interior Side Setback

6. Front Setback

1. Public Art In-lieu Fee

2. On-Grade Parking
Staff Recommendation
Staff recommends that ZAB determine the project is exempt from CEQA, pursuant to Section 15183.3 of the CEQA Guidelines (“Streamlining for Infill Projects”), and approve ZP2024 -0066 pursuant to BMC Section

23.406.040 (E) “Findings for Approval” and subject to the attached Findings and Conditions of Approval.

App # ZP2024-0066
Use Permit for a Project at 2109 Virginia Street
Sept 11, 2025
ATTACHMENT 1, EXHIBIT A

Page 17 of 432 ends
Page 351 ends

Page | 2

C EQA

Qualified Infill Checklist
The project is exempt from the requirements of CEQA pursuant to Section 15183.3 of the CEQA Guidelines (“Streamlining for Infill Projects”).

Evidence: The project is located in an urban area on a previously developed site. It is consistent with the applicable General Plan designations and policies, and with the applicable zoning designations and regulations. An environmental checklist was prepared for the project in accordance with CEQA Sections 15183.3 and 15162, utilizing the Housing Element’s Environmental Impact Report (EIR, SCH#2010032073) for a consistency analysis. The analysis concluded that the proposed project would not result in any new impacts that would require addit ional mitigation measures beyond those required by the Housing Element EIR.

FINDINGS FOR APPROVAL
As required by BMC Section 23.406.040 (E) (1-4) “Findings for Approval ,” the following findings shall be made:

1. To approv
e a Use Permit, the ZAB shall find that the proposed project or use:

a) Will not be detrimental to the health, safety, peace, morals, comfort, or general welfare of persons residing or visiting in the area or neighborhood of the proposed use; and

Evidence: The project will not be detrimental to the health safety, peace, morals, comfort or general welfare of person residing or visiting in the area because the project is consistent with all applicable C -NS, R-2A, and R -4 District standards , qualifies for concessions and waivers for the standards granted pursuant to State Density Bonus, Government Code, Section 65915 , and will not unreasonably obstruct sunlight, air , or views.

The increase in shadows would be limited to certain times of days during winter and summer, on adjacent properties. Specifically, in the summer, portions of buildings to the east would experience additional shade in the late afternoon, and the buildings to the west would experience additional shade in the morning . In the winter, additional shade would extend to buildings to the northwest in the morning , to the building in the north at noon, and to the buildings in the east in the late afternoon.

The project site is on a major commercial corridor, significantly slopes down from east to west, and abuts R-4 lots to the east, which allow heights up to 65 feet with a Use Permit. Therefore, even though the project will create new shadow impacts on neighboring buildings, the projected impacts will be in line with what is expected within a built urban environment.

Page 18 of 432 ends
Page 352 ends

Page | 3

The reduction in setbacks is consistent with development patterns found in the neighborhood, where commercial and mixed-use buildings are built up to the property line, and is permissible under a density bonus waiver to allow the construction of dwelling units; the project would not be detrimental to air quality.

b) Will not be detrimental or injurious to property and improvements of the adjacent properties, the surrounding area or neighborhood, or to the general welfare of the City.

Evidence: The project will not be detrimental or injurious to property and improvements of the adjacent properties, the surrounding area or neighborhood, or the general welfare of the City because the project will benefit the immediate and surrounding neighborhoods by replacing an underutilized commercial building with 110 additional housing units, including 18 below-market-rate units, which contribute to the local and regional housing stock, and ground floor commercial space that may provide services conveniently ac cessible to the nearby neighborhoods, and accessible by public transit. The 110 units proposed for an opportunity site, as identified in the Housing Element, will be accompanied by a commensurate amount of parking intended to mitigate any potential strain on the current on- street parking supply that may result from the mixed-use project.

2. To approve the Use Permit, the ZAB must also make any other Use Permit findings specifically required by the Zoning Ordinance for the proposed project.

DEMOLITION

Pursuant to BMC Section 23.326.070(D) “Demolition of Non -Residential Buildings,” the following findings shall be made : (1) the demolition will not be materially detrimental to the commercial needs and public interest of any affected neighborhood or the City, and (2) the demolition is required to allow a proposed new building or other proposed new use, will remove a building that is unusable for activities compatible with the purpose of the district or infeasible to modify for such uses, will remove a struct ure that is an uninhabitable attractive nuisance to the public, or is required for the furtherance of specific plans or projects sponsored by the City or other local district or authority.

Evidence: The proposed ground -floor commercial space is compatible with existing development patterns along Shattuck Avenue and Virginia Street and will accommodate neighborhood-serving commercial uses. The project aligns with the district’s objectives to provide a mix of commercial and residential development that is compatible with the existing uses within the C -NS district. The project redevelops an underutilized lot with a mixed- use building that will provide more

Page 19 of 432 ends
Page 353 ends

Page | 4

housing opportunities. The demolition of the existing 4,604-square -foot, two-story commercial building is necessary to allow the proposed new mixed- use building with 110 dwelling units, which cannot be accommodated in the existing building envelope. The project demolishes an underutilized parking lot and comm ercial building with vacant ground-floor tenants to be replaced with a mixed-use building that contains active frontages on Shattuck Avenue. The project implements the goals of the Housing Element by providing twice the number of units identified for the site.

DENSITY BONUS
A. Pursuant to Government Code Section 65915, the Zoning Adjustments Board finds that:

1. Under the City’s methodology for implementing density bonuses, the base pro
ject consists of 55 units;

2. T
he project will provide at least 9 Very Low Income and 9 Moderate Income qualifying units in the 55-unit base project, as more fully set forth in Condition 33;

3. The project is entitled to a density increase of 100 percent over the otherwise maximum allowable residential density under the Zoning Ordinance and General Plan Land Use Element, under the requirements of Government Code Section 65915(b) and (f), plus three concessions or incentives. This equates to a density bonus of up to 55 units above the base project, for a total of up to 110 units.

B. In accordance with Government Code Section 65915(d) and (k), the Zoning Adjustments Board hereby grants the following concessions in order to provide for affordable housing costs:

1. Public Art In-lieu Fee. A Concession from BMC Chapter 23.316 to allow an exemption from the Percentage for Public Art on Private Projects in-lieu fee; and

2. On-Grade Parking. A Concession to relocate the underground parking in the base project to above grade in the proposed project.

C. In accordance with Government Code Section 65915(d), in order to allow construction of the proposed project with the density permitted under State law, the Zoning Adjustments Board finds that the approval of the concessions is required to provide for affordable rents, as provided in Government Code Section 65915(d)(1)(A) because 1) approval of the concession would result in identifiable and actual cost reduction; 2) approval of the concession would not have a specific adverse impact upon public health and safety, or the physical environment, or on any real property listed in the California Register of Historical Resources; and 3) would not be contrary to State or Federal law.

Page 20 of 432 ends
Page 354 ends

Page | 5

D. In accordance with Government Code Section 65915(e) the Zoning Adjustments Board hereby grants the following waivers to modify development standards as necessary to accommodate these density bonus units.

North Shattuck Commercial District (C-NS)

1. Waiver from BMC Section 23.204.090(D)(1) “Basic Development Standards” for a mixed-use project to exceed the 35 -foot maximum height limit by adding 54 feet, 4 inches, for a total of 89 feet, 4 inches, and exceed the 3-story limit by adding 5 stories, for a total of 8 stories;

2. Waiver from BMC Section 23.204.090(D)(4) “Residential Window Setback” to reduce the setback for a Mixed -Use building, opposite a required window in any habitable room of a residential use to 0 feet, 0 inches where 10 feet is required;

3. Waiver from BMC Section 23.304.030(C)(2) “Lots Adjacent to Residential Districts” to reduce the interior side setback to 0 feet, 0 inches for the interior side where 5 feet is required;

4. Waiver from BMC Section 23.322.070(D)(1) “Excess Off -Street Parking” to exceed the maximum number of off-street residential parking;

Restricted Multiple Family Residential District (R-2A)

5. Waiver from BMC Section 23.202.090(D)(1) “Basic Development Standards” to exceed the 35 -foot maximum by adding 54 feet, 4 inches for a total of 89 feet, 4 inches, and exceed the 3 -story limit by adding 5 stories, for a total of 8 stories;

6. Waiver from BMC Section 23.202.090(D)(2) “Supplemental Development Standards” to exceed the 40% lot coverage limit for a 3 - story building on a corner lot by adding 60% for a total of 100% lot coverage;

7. Waiver from BMC Section 23.202.090(D)(1) “Basic Development Standards” to reduce the interior side setback to 0 feet, 0 inches on the first and second story where 4 feet is required;

Multi-Family Residential District (R-4)

8. Waiver from BMC Section 23.202.110(E)(1) “Basic Development Standards” to exceed the 65 -foot maximum height by adding 24 feet, 4 inches for a total of 89 feet, 4 inches and exceed the 6 -story limit by adding 2 stories, for a total of 8 stories;

9. Waiver from BMC Section 23.202.110(E)(2) “Supplemental Development Standards” to exceed the 40% lot coverage limit for a 6 - story building on a corner lot by adding 60% for a total of 100% lot coverage;

10. Waiver from BMC Section 23.202.110(E)(1) “Basic Development Standards” to reduce the front setback to 2 feet, 10 inches on the

Page 21 of 432 ends
Page 355 ends

Page | 6

western side of the lot and 5 feet, 8 inches on the eastern side of the lot where 15 feet is required; and

11. Waiver from BMC Section 23.202.110(E)(1) “Basic Development Standards” to reduce the interior side setback to 0 feet, 0 inches for stories 1-2 where 4 feet is required, and provide a 9 foot, 8-inch setback for 3-8 stories.

E. In accordance with Government Code Section 65915(e), in order to allow construction of the proposed project with the density permitted under State law, the Zoning Adjustments Board finds that the approval of waivers is required 1) to construct the proposed project at the density permitted under State law; 2) approval of requested waivers will not have a specific adverse impact upon public health and safety, or the physical environment, or on any real property listed in the California Register of Historical Resources; and 3) approval of the requested waivers will not be contrary to State or Federal law.

HOUSING ACCOUNTABILITY ACT

The Housing Accountability Act, Government Code Section 65589.5(j) requires that when a pr
oposed housing development complies with applicable, objective general plan and zoning standards, a local agency may not deny the project or approve it with reduced density
unless the agency makes written findings
supported by substantial evidence that: (1) the development would have a specific adverse impact on public health or safety unless disapproved or approved at a lower density; and (2) there is no feasible method to satisfactorily mitigate or avoid the specific adverse impact, other than the disapproval or approval at a lower density.

Evidence: The project includes construction of an 8-story (89 feet and 4 inches) 112,969 square-foot mixed-use residential development with 110 dwelling units (including 9 Very Low -Income and 9 Moderate Income units), 690 square feet of ground floor commercial space. Because the base project complies with applicable, objective general plan and zoning standards, Section 65589.5(j) does apply to this project. No significant, quantifiable, direct and unavoidable impacts, based on objective, identified written public health or safety standards, polices, or conditions, have been identified.

PERMIT FINDINGS FOR THE C-NS ZONING DISTRICT
As required by BMC Section 23.204.090 (E) “Permit Findings,” the following findings shall be made: To approve an AUP or Use Permit for a project in the C -NS district, the review authority must make the findings in Section 23.406.040 (Use Permits ) and find that the proposed use or structure:

Page 22 of 432 ends
Page 356 ends

Page | 7

1. Is compatible in design and character with the commercial district and the adjacent residential neighborhoods;
Evidence: The project is compatible in design and character to the commercial district and adjacent residential neighborhoods because it will construct a mixed- use building that offers both housing and commercial space, thereby contributing to the existing uses in the area and reinforcing compatibility with the C -NS neighborhood and adjacent residential neighborhoods.

2. Is compatible with the purposes and the existing character of the district.

Evidence: The project is compatible with the existing character and purposes of the district because it will construct a mixed-use building that provides housing and commercial space, contributing to the existing commercial and residential uses in the neighborhood and, therefore, compatible. It will provide commercial use on the ground level and provide off-street vehicle parking and bicycle parking, allowing the project to mitigate any potential intensification of available traffic capacity and potential parking supply that would result from the increased density.

3. Does not interfere with the continuity of retail or compatible service facilities at the ground level;

Evidence: The project does not interfere with the continuity of retail or compatible service facilities at the ground level because it will provide a commercial space on the ground floor , creating modern space and continuity to the existing ground-floor uses on Shattuck Avenue.

4. Does not exceed the amount and intensity of use that can be served by available traffic capacity and potential parking supply.

Evidence: The project does not exceed the amount and intensity of use that can be served by available traffic capacity and potential parking supply because it is accessible by public transportation, and will provide bicycle and vehicle parking spaces, thereby reduci ng the strain on the metered street parking supply in the area.

3. When taking action on a Use Permit, the ZAB shall consider in its findings:

(a) The proposed land use; and

Evidence: The proposed land use meets the findings for approval because the project’s residential and commercial uses are allowed land uses and consistent with the General Plan Land Use Designation of Neighborhood Commercial and with the C-NS, R-2A and R-4 zoning of the property. The additional residential units provided

Page 23 of 432 ends
Page 357 ends

Page | 8

will create new housing opportunities on a transit-served site, contributing to local and regional housing needs and consistent with the development standards, with the inclusion of applicable waivers and concessions allowed under the State Density Bonus law.

(b) The structure or addition that accommodates the use.

Evidence: The proposed construction of an 8-story multi-family building (89 feet and 4 inches in maximum height) i s consistent with the zoning development standards, with the inclusion of waivers to modify height and setback limits, pursuant to Government Code Section 65915 “State Density Bonus Law.”

4. Required findings shall be made based on the circumstances existing at the time a decision is made on the application.

Evidence: The required findings are satisfied because the project has been determined to be fully compliant with all applicable local and state regulations based on the project plans submitted on July 9, 2025 , included as analysis in this report, and evaluated based on the existing conditions of the subject site and surrounding neighborhood at the time of decision.

Page 24 of 432 ends
Page 358 ends

USE PERMIT ZP2024-0066

CONDITIONS OF APPROVAL
September 11, 2025

1947 Center Street, Berkeley, CA 94704 Tel: 510.981.7410 TDD: 510.981.7474 Fax: 510.981.7420 Email [email protected]
2109 Virginia Street
Use Permit to demolish a 2 -story commercial building (4,604 square feet) and surface parking lot, and construct an 8 -story (89 feet and 4 inches) 112,969 square-foot mixed -use residential development with 110 dwelling units (including 9 Very Low-Income and 9 Moderate Income units), 690 square feet of ground floor commercial space, 109 off -street vehicle parking spaces and 64 bicycle parking spaces.

I. STANDARD CONDITIONS OF APPROVAL FOR ALL PROJECTS
Pursuant to Berkeley Municipal Code (BMC) Title 23 Zoning Ordinance and Title 13 Public Peace, Morals, and Welfare, the following conditions, as well as all other applicable provisions of the Zoning Ordinance, apply to this Permit:

1. Conditions and Mi tigation Monitoring and Reporting Program Shall be Printed on
Plans. The conditions of this Permit shall be printed on the second sheet of each plan set submitted for a building permit pursuant to this Use Permit, under the title ‘Use Permit Conditions.’ Additional sheets may also be used if the second sheet is not of sufficient size to list all of the conditions. The sheet(s) containing the conditions shall be of the same size as those sheets containing the construction drawings.

2. Compliance Required (BMC Section 23.102.050). All land uses and structures in Berkeley must comply with the Zoning Ordinance and all applicable City ordinances and regulations. Compliance with the Zoning Ordinance does not relieve an applicant from requirements to comply with other federal, state, and City regulations that also apply to the property.

3. Approval Limited to Proposed Project and Replacement of Existing Uses (BMC Sections 23.404.060(B)(1) and (2)):

This Permit authorizes only the proposed project described in the application. In no way does an approval authorize other uses, structures or activities not included in the project description.

When the City approves a new use that replaces an existing use, any prior approval of the existing use becomes null and void when permits for the new use are exercised (e.g., building permit or business license issued). To re-establish the previously existing use, an applicant must obtain all permits required by the Zoning Ordinance for the use.

Page 25 of 432 ends
Page 359 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 2 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx

4. Conformance to Approved Plans (BMC Section 23.404.060(B)(4)).

All work performed under an approved permit shall comply with the approved plans and any conditions of approval.

5. Exercise and Expiration of Permits (BMC Section 23.404.060(C)):

A permit authorizing a land use is exercised when both a valid City business license is issued (if required) and the land use is established on the property.

A permit authorizing construction is exercised when both a valid City building permit (if required) is issued and construction has lawfully begun.

The Zoning Officer may declare a permit lapsed if it is not exercised within one year of its issuance, except if the applicant has applied for a building permit or has made a substantial good faith effort to obtain a building permit and begin construction. The Zoning Officer may declare a permit lapsed only after 14 days written notice to the applicant. A determin ation that a permit has lapsed may be appealed to the ZAB in accordance with BMC Chapter 23.410, Appeals and Certification.

A permit declared lapsed shall be void and of no further force and effect. To establish the use or structure authorized by the lapsed permit, an applicant must apply for and receive City approval of a new permit.

6. Permit Remains Effective for Vacant Property (BMC Section 23.404.060(D)). Once a Permit for a use is exercised and the use is established, the permit authorizing the use remains effective even if the property becomes vacant. The same use as allowed by the original permit may be re-established without obtaining a new permit, except as set forth in Standard Condition #5 above.

7. Permit Modifications (BMC Section 23.404.070). No c
hange in the use or structure for
which this Permit is issued is permitted unless the Permit is modified by the Board. The Zoning Officer may approve changes to plans approved by the Board, consistent with the Board’s policy adopted on May 24, 1978, which reduc
e the size of the project.

8. Permit Revocation (BMC Section 23.404.080). The City may revoke or modify a discretionary permit for completed projects due to: 1) violations of permit requirements; 2) Changes to the approved project; and/or 3) Vacancy for one year or more. However, no lawful residential use can lapse, regardless of the length of time of the vacancy.

Proceedings to revoke or modify a permit may be initiated by the Zoning Officer, Zoning Adjustments Board (ZAB), or City Council referral.

9. Pay Transparency Acknowledgement (BMC Section 13.104.030). Prior to the issuance of a building permit for any Project subject to this Chapter:

A Responsible Representative of the Permittee shall certify under penalty of perjury that the Permittee has reviewed Chapter 13.104 of the Berkeley Municipal Code, and will be responsible for demonstrating compliance with this Chapter.

The Permittee shall provide to the City a Contractor Pay Transparency Acknowledgment on a form approved by the City for this purpose. A Responsible Representative of the Permittee shall certify under penalty of perjury that the Contractor and all Qualifying Subcontractors performing work on the Project will comply with BMC

Page 26 of 432 ends
Page 360 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 3 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx Chapter 13.104 and with Labor Code sections 226(a) and 2810.5 for each employee who works on the Project.

10. Pay Transparency Attestations following Project Completion (BMC Section

13.104.040). Within 10 days of the approved final inspection of any Project subject to this Chapter, each Permittee shall provide to the City for each Contractor and Qualifying Subcontractor a Pay Transparency Attestation on a form approved by the City. On each Pay Transparency Attestation, a Responsible Representative of the Contractor or Qualifying Subcontractor shall attest under penalty of perjury that the Contractor or Qualifying Subcontractor complied with BMC Chapter 13.104 and Labor Code sections 226(a) and 2810.5 for each employee who performed work on the Project. The City will maintain Pay Transparency Attestation forms for period of at least three years after their date of receipt by the City

Page 27 of 432 ends
Page 361 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 4 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx

11. Posting of Wage Theft Ordinance (BMC Section 13.104.050). Each day work is performed on the Project, each Permittee shall post, and keep posted in a conspicuous location where it may be easily read by employees during the hours of the workday, a notice that: (A) contains the text of BMC Chapter 13.104; (B) explains that workers can report violations of Labor Code sections 226 and 2810.5 to the Labor Commissioner of the State of California; and (C) provides current contact information, including office address, telephone number, and email address of the Labor Commissioner of the State of California.

12. Wage Theft Prevention Conditions of Approval (BMC Section 13.104.060). The requirements of BMC Sections 13.104.030 through 13.104.050 shall be included as conditions of approval of any Use Permit or Zoning Certificate for any Project that is subject to this Chapter. Failure to comply with the requirements of any provision of this Chapter shall be grounds for issuance of an administrative citation under BMC Chapter 1.28 and/or the revocation or modification of any Use Permit issued for the Project under BMC Chapter

23.404.

13. Hold Harmless. The permittee agrees as a condition of approval of this application to indemnify, protect, defend with counsel selected by the City, and hold harmless, the City, and any agency or instrumentality thereof, and its elected and appointed officials, officers, employees and agents, from and against any and all liabilities, claims, actions, causes of action, proceedings, suits, damages, judgments, liens, levies, costs and expenses of whatever nature, including reasonable attorney’s fees and disbursements (collectively, “Claims”) arising out of or in any way relating to the approval of this application, any actions taken by the City related to this entitlement, or any environmental review conducted under the California Environmental Quality Act, Public Resources Code Section 210000 et seq., for this entitlement and related actions. The indemnification shall include any Claims that may be asserted by any person or entity, including the permittee, arising out of or in connection with the approval of this application, whether or not there is concurrent, passive or active negligence on the part of the City, and any agency or instrumentality thereof, and its elected and appointed officials, officers, employees and agents. The permittee’s duty to defend the City shall not apply in those instances when the permittee has asserted the Claims, although the permittee shall still have a duty to indemnify, protect and hold harmless the City.

Page 28 of 432 ends
Page 362 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 5 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx II. ADDITIONAL CONDITIONS IMPOSED BY THE ZONING ADJUSTMENTS BOARD Pursuant to BMC Section 23.404.050(H) Conditions of Approval, the Zoning Adjustments Board attaches the following additional conditions to this Permit:

Prior to Submittal of Any Building Permit:

14. Project Liaison. The applicant shall include in all building permit plans and post onsite the name and telephone number of an individual empowered to manage construction-related complaints generated from the project. The individual’s name, telephone number, and responsibility for the project shall be posted at the project site for the duration of the project in a location easily visible to the public. The individual shall record all complaints received and actions taken in response, and submit written reports of such complaints and actions to the project planner on a weekly basis. Please designate the name of this individual below:
 Project Liaison ____________________________________________________ Name Phone #

15. Address Assignment. The applicant shall file an “Address Assignment Request Application” with the Permit Service Center (1947 Center Street) for any address change or new address associated with this Use Permit. The new address(es) shall be assigned in accordance with BMC Section 16.28.030 Assignment and Installation of Numbers, and, except for new buildings on vacant lots, entered into the City’s database after the building permit is issued but prior to final inspection.

16. Bird Safe Buildings. Prior to submittal of the building permit, the applicant shall demonstrate compliance with the applicable bird safe building provisions in BMC Section

23.304.150, Bird Safe Buildings.

17. Construction Noise Reduction Program. The applicant shall develop a site-specific noise reduction program prepared by a qualified acoustical consultant to reduce construction noise impacts to the maximum extent feasible, subject to review and approval of the Zoning Officer. The noise reduction program shall include the time limits for construction listed above, as measures needed to ensure that construction complies with BMC Section

13.40.070, Prohibited Acts. The noise reduction program should include, but shall not be limited to, the following available controls to reduce construction noise levels as low as practical:

Construction equipment should be well maintained and used judiciously to be as quiet as practical.

Equip all internal combustion engine-driven equipment with mufflers, which are in good condition and appropriate for the equipment.

Utilize “quiet” models of air compressors and other stationary noise sources where technology exists. Select hydraulically or electrically powered equipment and avoid pneumatically powered equipment where feasible.

Page 29 of 432 ends
Page 363 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 6 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx Locate stationary noise- generating equipment as far as possible from sensitive receptors when adjoining construction sites. Construct temporary noise barriers or partial enclosures to acoustically shield such equipment where feasible.

Prohibit unnecessary idling of internal combustion engines.

If impact pile driving is required, pre- drill foundation pile holes to minimize the number of impacts required to seat the pile.

Construct solid plywood fences around construction sites adjacent to operational business, residences or other noise- sensitive land uses where the noise control plan analysis determines that a barrier would be effective at reducing noise.

Erect temporary noise control blanket barriers, if necessary, along building facades facing construction sites. This mitigation would only be necessary if conflicts occurred which were irresolvable by proper scheduling. Noise control blanket barriers can b e rented and quickly erected.

Route construction related traffic along major roadways and away from sensitive receptors where feasible.

18. Damage Due to Construction Vibration. The project applicant shall submit screening level analysis prior to, or concurrent with demolition building permit. If a screening level analysis shows that the project has the potential to result in damage to structures, a structural engineer or other appropriate professional shall be retained to prepare a vibration impact assessment (assessment). The assessment shall consider project specific information such as the composition of the structures, location of the various types of equipment used during each phase of the project, as well as the soil characteristics in the project area, in order to determine whether project construction may cause damage to any of the structures identified as potentially impacted in the screening level analysis. If the assessment finds that the project may cause damage to nearby structures, the structural engineer or other appropriate professional shall recommend design means and methods of construction that to avoid the potential damage, if feasible. The assessment and its recommendations shall be reviewed and approved by the Building and Safety Division and the Zoning Officer. If there are no feasible design means or methods to eliminate the potential for damage, the structural engineer or other appropriate professional shall undertake study of existing conditions (study) of any structures (or, in case of large buildings, of the portions of the structures) that may experience damage.

This study shall establish the baseline condition of these structures, including, but not limited to, the location and extent of any visible cracks or spalls; and include written descriptions and photographs.

Page 30 of 432 ends
Page 364 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 7 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx The study shall be reviewed and approved by the Building and Safety Division and the Zoning Officer prior to issuance of a grading permit. Upon completion of the project, the structures (or, in case of large buildings, of the portions of the structures) previously inspected will be resurveyed, and any new cracks or other changes shall be compared to pre-construction conditions and a determination shall be made as to whether the proposed project caused the damage. The findings shall be submitted to the Building and Safety Division and the Zoning Officer for review. If it is determined that project construction has resulted in damage to the structure, the damage shall be repaired to the pre-existing condition by the project sponsor, provided that the property owner approves of the repair.

19. Compliance with Conditions of Approval and Environmental Mitigations. The building permit application is subject to verification of compliance of these Conditions of Approval and the adopted Mitigation Monitoring and Reporting Program (Attachment 3 – Exhibit A).

The applicant shall be responsible for demonstrating compliance with all conditions of approval and mitigation measures per the timeline set forth by this use permit. The applicant shall deposit $10,000 with the City, or less with the approval of the Zoning Officer, to pay for the cost of monitoring compliance with these Conditions of Approval and other applicable conditions and regulations. Should compliance-monitoring expenses exceed the initial deposit, the applicant shall deposit additional funds to cover such additional expenses upon the request of the Zoning Officer; any unused deposit will be refunded to the applicant.

Prior to Issuance of Any Building & Safety Permit (Demolition or Construction)

20. Demolition. Demolition of the existing building cannot commence until a complete application is submitted for the replacement building. In addition, all plans presented to the City to obtain a permit to allow the demolition are subject to these conditions.

21. Construction Noise Management - Public Notice Required. At least two weeks prior to initiating any construction activities at the site, the applicant shall provide notice to businesses and residents within 500 feet of the project site. This notice shall at a minimum provide the following: (1) project description, (2) description of construction activities during extended work hours and reason for extended hours, (3) daily construction schedule (i.e., time of day) and expected duration (number of months), (4) the name and phone number of the Project Liaison for the project that is responsible for responding to any local complaints, and (5) that construction work is about to commence. The liaison would determine the cause of all construction-related complaints (e.g., starting too early, bad muffler, worker parking, etc.) and institute reasonable measures to correct the problem. A copy of such notice and methodology for distributing the notice shall be provided in advance to the City for review and approval.

22. Construction Phases. The applicant shall provide the Zoning Officer with a schedule of major construction phases with start dates and expected duration, a description of the activities and anticipated noise levels of each phase, and the name(s) and phone number(s) of the individual(s) directly supervising each phase. The Zoning Officer or his/her designee shall have the authority to require an on-site meeting with these individuals as necessary to ensure compliance with these conditions. The applicant shall notify the Zoning Officer of any changes to this schedule as soon as possible.

Page 31 of 432 ends
Page 365 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 8 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx

23. Construction and Demolition Diversion. Applicant shall submit a Construction Waste Management Plan that meets the requirements of BMC Chapter 19.37 including 100 percent diversion of asphalt, concrete, excavated soil and land-clearing debris and a minimum of 65 percent diversion of other nonhazardous construction and demolition waste.

24. Toxics. The applicant shall contact the Toxics Management Division (TMD) at 1947 Center Street or (510) 981-7470 to determine which of the following documents are required and timing for their submittal:

Phase I and Phase II Environmental Site Assessment (ESA) (per ASTM 1527). A recent Phase I ESA (less than 2 years old) shall be submitted to the Toxics Management Division for developments for: all new commercial, industrial and mixed- use developments and all improvement projects that require work 5 or more feet below grade, and all new residential buildings with more than four dwelling units located in the Environmental Management Area (or EMA). The EMA can be viewed at: City of Berkeley Community GIS Portal (arcgis.com)
Depending on the findings in the Phase I, a Phase II or additional investigation may be necessary. Any available soils and groundwater analytical data available for projects listed in this section must also be submitted to TMD.

Environmental Site Clearance. The applicant shall provide environmental screening clearance from either the San Francisco Bay Regional Water Quality Control Board (RWQCB), Department of Toxic Substances Control (DTSC), or the Alameda County Department of Environmental Health’s Local Oversight Program (LOP). Clearance from one of these regulatory agencies will ensure that the property meets development investigation and cleanup standards for the specific use proposed on the property.

Environmental screening clearance shall be submitted to the City of Berkeley’s Toxics Management Division prior to issuance of any building permits.

Soil and Groundwater Management Plan. A site -specific Soil and Groundwater Management Plan (SGMP) shall be submitted to Toxics Management Division (TMD) for all non-residential projects, and residential or mixed-use projects with more than four dwelling units, that: (1) are in the Environmental Management Area (EMA), as shown on the most recent City of Berkeley EMA map, and (2) propose any excavations deeper than 5 feet below grade or if significant soils removal is anticipated. The SGMP shall be submitted to the TMD with the project’s building permit application and shall be approved by TMD prior to issuance of the building permit.

The SGMP shall comply with the hazardous materials and waste management standards required by BMC Section 15.12.100, the stormwater pollution prevention requirements of San Francisco Bay Regional Water Quality Control Board’s Order No.

R2-2009-0074, Califo rnia hazardous waste generator regulations (Title 22 California Code of Regulations (CCR) 66260 et seq.), and the East Bay Municipal Utility District’s Ordinance 311, and shall include the following:
i. procedures for soil and groundwater management including identification of pollutants and disposal methods;

Page 32 of 432 ends
Page 366 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 9 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx ii. procedures to manage odors, dust and other potential nuisance conditions expected during development;
iii. notification to TMD within 24 hours of the discovery of any previously undiscovered contamination; and
iv. the name and phone number of the individual responsible for implementing the SGMP and who will respond to community questions or complaints.

TMD may require additional information or impose additional conditions as deemed necessary to protect human health and the environment. All requirements of the approved SGMP shall be deemed conditions of approval.

Demolitions & Renovations – Building Materials Survey . A hazardous materials survey for building materials and plans on hazardous materials and hazardous waste removal and disposal is required and must be prepared by qualified professionals, and submitted to the Toxics Management Division (TMD) prior to issuance of the building permit.
i. The survey shall include the identification of all materials to be disturbed for lead-based paints, PCB containing equipment and caulking, hydraulic fluids, refrigerants, treated wood, and mercury containing devices (including fluorescent light bulbs and mercury switches), asbestos and other hazardous materials and chemicals.
ii. If asbestos is identified, Bay Area Air Quality Management District Regulation 11-2-401.3 a notification must be made and the J number must be made available to the City of Berkeley Permit Service Center. Contractors must follow state regulations where there is asbestos-related work involving 100 square feet or more of asbestos containing material (8 Cal. Code Regs. §1529, §341.6 et seq.)
iii. The report to the TMD shall include, in addition to the survey, plans on hazardous materials and hazardous waste removal and disposal that comply with State and Federal codes including California Code of Regulations (CCR) 66260 et seq.
iv. Documentation evidencing disposal of hazardous waste in compliance with the survey shall be submitted to TMD within 30 days of the completion of the demolition.

Please note, the PCB Screening Form required by Public Works, Engineering, is a separate requirement and does not address the PCB identification requirement of the Toxics Management Division.

Page 33 of 432 ends
Page 367 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 10 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx Hazardous Materials Business Plan. A Hazardous Materials Business Plan (HMBP) in compliance with BMC Section 15.12.040 and California Health & Safety Code, Chapter 6.95 Div. 20, shall be submitted to the Toxics Management Division through the California Environmental Reporting System: http://cers.calepa.ca.gov/ for chemicals used or stored on site during construction that exceed reporting thresholds. The reporting is required if your facility stores or handles hazardous materials in aggregate quantities equal to or greater than 55 gallons for liquids, 500 pounds for solids, or 200 cubic feet of compressed gases, or generates any quantity of hazardous waste. This includes welding gases, emergency generator fuel, paints, etc.

Additionally, the business occupant must submit an HMBP within 30 days of starting operations.

Petroleum Storage. An (SPCC) Plan is required to be prepared and implemented for facilities with any one of the following:
i. aggregate aboveground petroleum storage capacities of 1,320 gallons or more stored in aboveground storage containers, tanks, oil-filled equipment, or ii. one or more tank(s) in an underground area (TIUGA) with petroleum storage capacities of 55 gallons or greater. More information on TIUGAs can be found here: https://osfm.fire.ca.gov/divisions/pipeline-safety-and-cupa/certified- unified-program-agency-cupa/aboveground-petroleum-storage-act/tank-in-an- underground-area-tiuga/
The SPCC plan must be prepared prior to beginning operations and you must submit facility information to Toxics Management Division (TMD) through the California Environmental Reporting System: http://cers.calepa.ca.gov/. The SPCC plan will be reviewed during the site inspection and shall not be submitted in CERS or to the TMD.

Prior to Issuance of Any Building (Construction) Permit

25. Parcel Merger/Lot Line Adjustment. The applicant shall secure approval of any parcel merger and/or lot line adjustment associated with this Use Permit.

26. Final Design Review. The Project requires approval of a Final Design Review application by the Design Review Committee.

27. HVAC Noise Reduction. Prior to the issuance of building permits, the project applicant shall submit plans that show the location, type, and design of proposed heating, ventilation, and cooling (HVAC) equipment. In addition, the applicant shall provide product specification sheets or a report from a qualified acoustical consultant showing that operation of the proposed HVAC equipment will meet the City’s exterior noise requirements in BMC Section

13.40.050. The City’s Planning and Development Department shall review the submitted plans, including the selected HVAC equipment, to verify compliance with exterior noise standards.

Page 34 of 432 ends
Page 368 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 11 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx

28. Interior Noise Levels. Prior to issuance of a building permit, the applicant shall submit a report to the Building and Safety Division and the Zoning Officer by a qualified acoustic engineer certifying that the interior residential portions of the project will achieve interior noise levels of no more than 45 Ldn (Average Day-Night Levels). If the adopted Building Code imposes a more restrictive standard for interior noise levels, the report shall certify compliance with this standard.

29. Solar Photovoltaic (Solar PV) and Battery Energy Storage Systems (ESS). A solar PV system shall be installed, subject to specific limited exceptions, as specified by the Berkeley Energy Code (BMC Chapter 19.36). Energy storage system (ESS) readiness (new single-family, duplex, and townhouse homes) or ESS installation (new multifamily and most nonresidential buildings) shall be completed as specified by BMC Chapter 19.36.

Location of the solar PV system and the ESS, if applicable, shall be noted on the construction plans. (Project required to meet applicable code at time of building permit application, if different from above.)

30. Electric Vehicle (EV) Charging. At least 10 percent of the project parking spaces for residential parking shall have installed Level 2 (40 amp) electric vehicle (EV) charging stations, and at least 40 percent shall have installed low power Level 2 EV charging receptacles (20 amp), or any more stringent EV charging requirements as specified by the Berkeley Green Code (BMC Chapter 19.37). Required Level 2 charging stations and low power Level 2 EV charging receptacles shall be installed, maintained, and made available for building resident use. EV charging station installations, EV charging receptacles, and EV Capable spaces shall be noted on the construction plans. Public access parking spaces shall provide any applicable mandatory accessibility provisions. (Project required to meet applicable code at time of building permit application, if different from above.)

31. Water Efficient Landscaping. Landscaping, totaling 500 square feet of more of new landscaping or 2,500 square feet or more of renovated irrigated area, shall comply with the State’s Model Water Efficient Landscape Ordinance (MWELO). MWELO-compliant landscape documentation including a planting, grading, and irrigation plan shall be included in site plans. Water budget calculations are also required for landscapes of 2,500 square feet or more and shall be included in site plans. The reference evapotranspiration rate (ETo) for Berkeley is 41.8.

32. Recycling and Organics Collection. Applicant shall provide recycling and organics collection areas for occupants, clearly marked on plans, which comply with the Alameda County Organics Reduction and Recycling Ordinance (2021-02). Contact the Zero Waste Division at [email protected].

33. Public Works ADA. Plans submitted for building permit shall include replacement of sidewalk, curb, gutter, and other streetscape improvements, as necessary to comply with current City of Berkeley standards for accessibility.

Page 35 of 432 ends
Page 369 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 12 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx AFFORDABLE HOUSING REQUIREMENTS – RESIDENTIAL PROJECTS

34. Affordable Housing Compliance Plan. The final Affordable Housing Compliance Plan (“AHCP”) must be certified by the Zoning Officer and the Department of Health, Housing, and Community Services prior to the issuance of Building Permit. Projects that receive approval from the Building Official for multiple phase construction permits must have the final AHCP certified prior to the issuance of the phase one building permit.

35. Below Market Rate Units. Nine Very-Low Income and nine Moderate Income Below Market Rate rental dwelling units (BMR Units) shall be provided in the project. All affordable units provided pursuant to Density Bonus Section of the permit findings shall be designated as BMR Units. All BMR units are required to comply with the stricter of the State Density Bonus Law (Government Code Section 65915) and BMC Section 23.328.030(A) Affordable Housing Requirements.

Summary table of project BMR units
Code
Section
Extremely-
Low Income
(30% AMI)
Very-Low
Income
(50% AMI)
Low Income
(80% AMI)
Moderate Income
(30% x 110% AMI)
BMC Chapter

23.328
(Inclusionary
Housing)
0 9 0 0
State Density
Bonus Law
(Gov. Code
Section
65915)
0 9 0 9
Total 0 9 0 9

Page 36 of 432 ends
Page 370 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 13 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx

36. Regulatory Agreement. If BMR units are provided, the owner shall enter into a Regulatory Agreement that implements Government Code Section 65915, BMC Section 23.328.030, and other provisions for BMR units included in this Use Permit. The Regulatory Agreement may include any terms and affordability standards determined by the City to be necessary to ensure such compliance. The Regulatory Agreement will secure the property’s obligation to comply with the requirements for providing BMR units as defined by BMC Chapter

23.328 and State Density Bonus Law (Government Code Section 65915). The applicant shall submit the Regulatory Agreement to the Department of Health, Housing, and Community Services for review and approval. All BMR units are required to comply with the Regulatory Agreement and the BMR Administrative Guidelines. Regulatory Agreements must be executed prior to the issuance of Building Permit, or, in the case of projects that receive approval from the Building Official for multiple phase construction permits, prior to the issuance of the phase one building permit.

37. Payment of Affordable Housing In-Lieu Fee. The Affordable Housing In-Lieu Fee shall be paid as required by BMC Section 23.328.030(B) and Resolution 70,698 N.S. The fee for this project is $462,855, subject to proration to reflect affordable units provided. Any adjustments to the fee and the final fee amount will be determined prior to building permit issuance as part of the Affordable Housing Compliance Plan approval. The In-Lieu Fee shall be paid prior to the issuance of the first Certificate of Occupancy, or if no Certificate of Occupancy is required, prior to the final inspection of the Project. Nothing in these conditions shall be interpreted to prohibit, or to require modification of the Use Permit or Regulatory Agreement to allow, the provision of additional BMR units, or additional affordability, then are required in the foregoing provisions.

Prior to Demol
ition or Start of Construction:

38. Construction Meeting. The applicant shall request of the Zoning Officer an on-site meeting with City staff and key parties involved in the early phases of construction (e.g., applicant, general contractor, foundation subcontractors) to review these conditions and the construction schedule. The general contractor or applicant shall ensure that all subcontractors involved in subsequent phases of construction aware of the conditions of approval.

39. Transportation Construction Plan. The applicant and all persons associated with the project are hereby notified that a Transportation Construction Plan (TCP) may be required, particularly for the following activities:

Alterations, closures, or blockages to sidewalks, pedestrian paths or vehicle travel lanes (including bicycle lanes);
Storage of building materials, equipment, dumpsters, debris anywhere in the public ROW;
Provision of exclusive contractor parking on-street; or Significant truck activity.

Page 37 of 432 ends
Page 371 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 14 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx Please contact the Office of Transportation at (510) 981-7010, or 1947 Center Street, and ask to speak to a traffic engineer. In addition to other requirements of the Traffic Engineer, this plan shall include the locations of material and equipment storage, trailers, worker parking, a schedule of site operations that may block traffic, and provisions for traffic control. The TCP shall be stamped and signed by a registered engineer prior to submittal.

The TCP shall be consistent with any other requirements of the construction phase. A current copy of this Plan shall be available at all times at the construction site for review by City Staff.

40. Construction/No Parking Permits. Contact the Permit Service Center (PSC) at 1947 Center Street or 981-7500 for details on obtaining Construction/No Parking Permits (and associated signs and accompanying dashboard permits). Please note that the Zoning Officer and/or Traffic Engineer may limit off-site parking of construction-related vehicles if necessary to protect the health, safety or convenience of the surrounding neighborhood.

During Construction:

41. Construction Hours. Construction activity shall be limited to between the hours of 7:00 AM and 6:00 PM on Monday through Friday, and between 9:00 AM and 4:00 PM on Saturday. No construction-related activity shall occur on Sunday or any Federal Holiday.

42. Construction Hours- Exceptions. It is recognized that certain construction activities, such as the placement of concrete, must be performed in a continuous manner and may require an extension of these work hours. Prior to initiating any activity that might require a longer period, the developer must notify the Zoning Officer and request an exception for a finite period of time. If the Zoning Officer approves the request, then two weeks prior to the expanded schedule, the developer shall notify businesses and residents within 500 feet of the project site describing the expanded construction hours. A copy of such notice and methodology for distributing the notice shall be provided in advance to the City for review and approval. The project shall not be allowed more than 15 extended working days.

43. Project Construction Website. The applicant shall establish a project construction website with the following information clearly accessible and updated monthly or more frequently as changes warrant.

Contact information (i.e. “hotline” phone number, and email address) for the project construction manager
Calendar and schedule of daily/weekly/monthly construction activities The final Conditions of Approval, Mitigation Monitoring and Reporting Program, Transportation Construction Plan, Construction Noise Reduction Program, and any other reports or programs related to construction noise, air quality, and traffic.

44. Public Works - Implement Bay Area Air District (BAAD)-Recommended Measures during Construction. For all proposed projects, BAAD recommends implementing all the Basic Construction Mitigation Measures, listed below to meet the best management practices threshold for fugitive dust:

Page 38 of 432 ends
Page 372 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 15 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day.

All haul trucks transporting soil, sand, or other loose material off-site shall be covered.

All visible mud or dirt track -out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.

All vehicle speeds on unpaved roads shall be limited to 15 mph.

All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.

Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]).

Clear signage shall be provided for construction workers at all access points.

All construction equipment shall be maintained and properly tuned in accordance with manufacturer specifications. All equipment shall be checked by a certified visible emissions evaluator.

Post a publicly visible sign with the telephone number and person to contact at the lead agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District ’s phone number shall also be visible to ensure compliance with applicable regulations.

45. Air Quality - Diesel Particulate Matter Controls during Construction. All off-road construction equipment used for projects with construction lasting more than 2 months shall comply with one of the following measures:

The project applicant shall prepare a health risk assessment that demonstrates the project’s on- site emissions of diesel particulate matter during construction will not exceed health risk screening criteria after a screening- level health risk assessment is conducted in accordance with current guidance from BAAD and OEHHA. The health risk assessment shall be submitted to the Land Use Planning Division for review and approval prior to the issuance of building permits; or
All construction equipment shall be equipped with Tier 2 or higher engines and the most effective Verified Diesel Emission Control Strategies (VDECS) available for the engine type (Tier 4 engines automatically meet this requirement) as certified by the Cal ifornia Air Resources Board (CARB). The equipment shall be properly maintained and tuned in accordance with manufacturer specifications.

In addition, a Construction Emissions Minimization Plan (Emissions Plan) shall be prepared that includes the following:

Page 39 of 432 ends
Page 373 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 16 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx i. An equipment inventory summarizing the type of off-road equipment required for each phase of construction, including the equipment manufacturer, equipment identification number, engine model year, engine certification (tier rating), horsepower, and engine serial number. For all VDECS, the equipment inventory shall also include the technology type, serial number, make, model, manufacturer, CARB verification number level, and installation date. ii. A Certification Statement that the Contractor agrees to comply fully with the Emissions Plan and acknowledges that a significant violation of the Emissions Plan shall constitute a material breach of contract. The Emissions Plan shall be submitted to the Public Works Department for review and approval prior to the issuance of building permits.

46. Construction and Demolition Diversion. Divert debris according to your plan and collect required documentation. Get construction debris receipts from sorting facilities in order to verify diversion requirements. Upload recycling and disposal receipts if using Green Halo and submit online for City review and approval prior to final inspection. Alternatively, complete the Construction Waste Management Plan and present it, along with your construction debris receipts, to the Building Inspector by the final inspection to demonstrate diversion rate compliance. The Zoning Officer may request summary reports at more frequent intervals, as necessary to ensure compliance with this requirement.

47. Low-Carbon Concrete. The project shall maintain compliance with the Berkeley Green Code (BMC Chapter 19.37) including use of concrete mix design with a cement reduction of at least 25 percent. Documentation on concrete mix design shall be available at all times at the construction site for review by City Staff. (Project required to meet applicable code at time of building permit application, if different from above.)

48. Avoid Disturbance of Nesting Birds. Initial site disturbance activities, including vegetation and concrete removal, shall be prohibited during the general avian nesting season (February 1 to August 30), if feasible. If nesting season avoidance is not feasible, the applicant shall retain a qualified biologist to conduct a preconstruction nesting bird survey to determine the presence/absence, location, and activity status of any active nests on or adjacent to the project site. The extent of the survey buffer area surrounding the site shall be established by the qualified biologist to ensure that direct and indirect effects to nesting birds are avoided. To avoid the destruction of active nests and to protect the reproductive success of birds protected by the MBTA and CFGC, nesting bird surveys shall be performed not more than 14 days prior to scheduled vegetation and concrete removal.

In the event that active nests are discovered, a suitable buffer (typically a minimum buffer of 50 feet for passerines and a minimum buffer of 250 feet for raptors) shall be established around such active nests and no construction shall be allowed inside the buffer areas until a qualified biologist has determined that the nest is no longer active (e.g., the nestlings have fledged and are no longer reliant on the nest). No ground-disturbing activities shall occur within this buffer until the qualified biologist has confirmed that breeding/nesting is completed and the young have fledged the nest. Nesting bird surveys are not required for construction activities occurring between August 31 and January 31.

Page 40 of 432 ends
Page 374 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 17 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx

49. Archaeological Resources (Ongoing throughout demolition, grading, and/or construction). Pursuant to CEQA Guidelines section 15064.5(f), “provisions for historical or unique archaeological resources accidentally discovered during construction” should be instituted. Therefore:

In the event that any prehistoric or historic subsurface cultural resources are discovered during ground disturbing activities, all work within 50 feet of the resources shall be halted and the project applicant and/or lead agency shall consult with a qualified archaeologist, historian or paleontologist to assess the significance of the find.

If any find is determined to be significant, representatives of the project proponent and/or lead agency and the qualified professional would meet to determine the appropriate avoidance measures or other appropriate measure, with the ultimate determination to be made by the City of Berkeley. All significant cultural materials recovered shall be subject to scientific analysis, professional museum curation, and/or a report prepared by the qualified professional according to current professional standards.

In considering any suggested measure proposed by the qualified professional, the project applicant shall determine whether avoidance is necessary or feasible in light of factors such as the uniqueness of the find, project design, costs, and other considerations.

If avoidance is unnecessary or infeasible, other appropriate measures (e.g., data recovery) shall be instituted. Work may proceed on other parts of the project site while mitigation measures for cultural resources is carried out.

If significant materials are recovered, the qualified professional shall prepare a report on the findings for submittal to the Northwest Information Center.

50. Human Remains (Ongoing throughout demolition, grading, and/or construction). In the event that human skeletal remains are uncovered at the project site during ground- disturbing activities, all work shall immediately halt and the Alameda County Coroner shall be contacted to evaluate the remains, and following the procedures and protocols pursuant to Section 15064.5 (e)(1) of the CEQA Guidelines. If the County Coroner determines that the remains are Native American, the City shall contact the California Native American Heritage Commission (NAHC), pursuant to subdivision (c) of Section 7050.5 of the Health and Safety Code, and all excavation and site preparation activities shall cease within a 50- foot radius of the find until appropriate arrangements are made. If the agencies determine that avoidance is not feasible, then an alternative plan shall be prepared with specific steps and timeframe required to resume construction activities. Monitoring, data recovery, determination of significance and avoidance measures (if applicable) shall be completed expeditiously.

Page 41 of 432 ends
Page 375 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 18 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx

51. Paleontological Resources (Ongoing throughout demolition, grading, and/or construction). In the event of an unanticipated discovery of a paleontological resource during construction, excavations within 50 feet of the find shall be temporarily halted or diverted until the discovery is examined by a qualified paleontologist (per Society of Vertebrate Paleontology standards [SVP 1995,1996]). The qualified paleontologist shall document the discovery as needed, evaluate the potential resource, and assess the significance of the find. The paleontologist shall notify the appropriate agencies to determine procedures that would be followed before construction is allowed to resume at the location of the find. If the City determines that avoidance is not feasible, the paleontologist shall prepare an excavation plan for mitigating the effect of the project on the qualities that make the resource important, and such plan shall be implemented. The plan shall be submitted to the City for review and approval.

52. Halt Work/Unanticipated Discovery of Tribal Cultural Resources. In the event that cultural resources of Native American origin are identified during construction, all work within 50 feet of the discovery shall be redirected. The project applicant and project construction contractor shall notify the City Planning Department within 24 hours. The City will again contact any tribes who have requested consultation under AB 52, as well as contact a qualified archaeologist, to evaluate the resources and situation and provide recommendations. If it is determined that the resource is a tribal cultural resource and thus significant under CEQA, a mitigation plan shall be prepared and implemented in accordance with State guidelines and in consultation with Native American groups. If the resource cannot be avoided, additional measures to avoid or reduce impacts to the resource and to address tribal concerns may be required.

53. Stormwater Requirements. The applicant shall demonstrate compliance with the requirements of the City’s National Pollution Discharge Elimination System (NPDES) permit as described in BMC Section 17.20. The following conditions apply:

The project plans shall identify and show site- specific Best Management Practices (BMPs) appropriate to activities conducted on- site to limit to the maximum extent practicable the discharge of pollutants to the City's storm drainage system, regardless of season or weather conditions.

Trash enclosures and/or recycling area(s) shall be covered; no other area shall drain onto this area. Drains in any wash or process area shall not discharge to the storm drain system; these drains should connect to the sanitary sewer. Applicant shall contact the City of Berkeley and EBMUD for specific connection and discharge requirements.

Discharges to the sanitary sewer are subject to the review, approval and conditions of the City of Berkeley and EBMUD.

Landscaping shall be designed with efficient irrigation to reduce runoff, promote surface infiltration and minimize the use of fertilizers and pesticides that contribute to stormwater pollution. Where feasible, landscaping should be designed and operated to treat runoff.

When and where possible, xeriscape and drought tolerant plants shall be incorporated into new development plans.

Page 42 of 432 ends
Page 376 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 19 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx Design, location and maintenance requirements and schedules for any stormwater quality treatment structural controls shall be submitted to the Department of Public Works for review with respect to reasonable adequacy of the controls. The review does not relieve the property owner of the responsibility for complying with BMC Chapter

17.20 and future revisions to the City's overall stormwater quality ordinances. This review shall be shall be conducted prior to the issuance of a Building Permit.

All paved outdoor storage areas must be designed to reduce/limit the potential for runoff to contact pollutants.

All on -site storm drain inlets/catch basins must be cleaned at least once a year immediately prior to the rainy season. The property owner shall be responsible for all costs associated with proper operation and maintenance of all storm drainage facilities (pipelines, inlets, catch basins, outlets, etc.) associated with the project, unless the City accepts such facilities by Council action. Additional cleaning may be required by City of Berkeley Public Works Engineering Dept.

All private or public projects that create and/or replace 5,000 square feet or more of impervious surface must comply with Provision C.3 of the Alameda County NPDES permit and must incorporate stormwater controls to enhance water quality. Permit submittals shall include a Stormwater Requirement Checklist and detailed informa tion showing how the proposed project will meet Provision C.3 stormwater requirements, including a) Site design measures to reduce impervious surfaces, promote infiltration, and reduce water quality impacts; b) Source Control Measures to keep pollutants out of stormwater runoff; c) Stormwater treatment measures that are hydraulically sized to remove pollutants from stormwater; d) an O & M (Operations and Maintenance) agreement for all stormwater treatment devices and installations; and e) Engineering calculations for all stormwater devices (both mechanical and biological). (Project required to meet applicable code at time of building permit application, if different from above.)
All on-site storm drain inlets must be labeled “No Dumping – Drains to Bay” or equivalent using methods approved by the City.

Most washing and/or steam cleaning must be done at an appropriately equipped facility that drains to the sanitary sewer. Any outdoor washing or pressure washing must be managed in such a way that there is no discharge or soaps or other pollutants to the storm drain. Sanitary connections are subject to the review, approval and conditions of the sanitary district with jurisdiction for receiving the discharge.

All loading areas must be designated to minimize “run- on” or runoff from the area.

Accumulated waste water that may contribute to the pollution of stormwater must be drained to the sanitary sewer or intercepted and pretreated prior to discharge to the storm drain system. The property owner shall ensure that BMPs are implemented to prevent potential stormwater pollution. These BMPs shall include, but are not limited to, a regular program of sweeping, litter control and spill cleanup.

Page 43 of 432 ends
Page 377 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 20 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx Sidewalks and parking lots shall be swept regularly to prevent the accumulation of litter and debris. If pressure washed, debris must be trapped and collected to prevent entry to the storm drain system. If any cleaning agent or degreaser is used, wash water shall not discharge to the storm drains; wash waters should be collected and discharged to the sanitary sewer. Discharges to the sanitary sewer are subject to the review, approval and conditions of the sanitary district with jurisdiction for receiving the discharge.

The applicant is responsible for ensuring that all contractors and sub- contractors are aware of and implement all stormwater quality control measures. Failure to comply with the approved construction BMPs shall result in the issuance of correction notices, citations, or a project stop work order.

54. Public Works. Subject to approval of the Public Works Department, the applicant shall repair any damage to public streets and/or sidewalks by construction vehicles traveling to or from the project site.

55. Public Works. All piles of debris, soil, sand, or other loose materials shall be covered at night and during rainy weather with plastic at least one-eighth millimeter thick and secured to the ground.

56. Public Works. The applicant shall ensure that all excavation accounts for surface and subsurface waters and underground streams so as not to adversely affect adjacent properties and rights-of-way.

57. Public Works. The project sponsor shall maintain sandbags or other devices around the site perimeter during the rainy season to prevent on-site soils from being washed off-site and into the storm drain system. The project sponsor shall comply with all City ordinances regarding construction and grading.

58. Public Works. Prior to any excavation, grading, clearing, or other activities involving soil disturbance during the rainy season the applicant shall obtain approval of an erosion prevention plan by the Building and Safety Division and the Public Works Department. The applicant shall be responsible for following these and any other measures required by the Building and Safety Division and the Public Works Department.

59. Public Works. The removal or obstruction of any fire hydrant shall require the submission of a plan to the City’s Public Works Department for the relocation of the fire hydrant during construction.

60. Public Works / Building and Safety. If underground utilities leading to adjacent properties are uncovered and/or broken, the contractor involved shall immediately notify the Public Works Department and the Building & Safety Division, and carry out any necessary corrective action to their satisfaction.

Page 44 of 432 ends
Page 378 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 21 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx Prior to Final Inspection or Issuance of Occupancy Permit:

61. Compliance with Conditions. The project shall conform to the plans and statements in the Use Permit. The developer is responsible for providing sufficient evidence to demonstrate compliance with the requirements throughout the implementation of this Use Permit.

62. All landscape, site and architectural improvements shall be completed per the attached approved drawings received July 9, 2025.

63. Transportation Demand Management. Prior to issuance of a Certificate of Occupancy, the property owner shall facilitate a site inspection by Land Use Division staff to confirm that the physical improvements required in BMC Sections 23.334.030(C) and 23.322.090 (bike parking) have been installed. A Parking and Transportation Demand Management (PTDM) compliance report documenting that the programmatic measures required in BMC Sections 23.334.030(C) and 23.322.090 are implemented shall be submitted to the Land Use Division prior to occupancy, and on an annual basis thereafter, which demonstrates that the project is compliant with the applicable requirements in these sections.

Consistent with BMC Section 23.334.030(A), all parking spaces provided for residents be leased or sold separate from the rental or purchase of dwelling units for the life of the dwelling units. The property owner shall notify all residents of this restriction in leases and/or contracts, and shall provide sample leases and/or contracts including such notification to the project planner prior to issuance of Certificate of Occupancy or final inspection.

Consistent with BMC Section 23.334.030(B), at least one of the following transit benefits shall be offered, at no cost to the resident, for a period of ten years after the issuance of a Certificate of Occupancy. A notice describing these transportation benefits shall be posted in a location or locations visible to all residents. i. One monthly pass for unlimited local bus transit service for every bedroom in each dwelling unit.
ii. Subject to the review and approval of the Zoning Officer in consultation with the Transpor
tation Division Manager, a functionally equivalent transit benefit in an amount at least equal to the price of a non-discounted
unlimited adult monthly
pass for unlimited local bus transit service monthly local bus pass.

Consistent with BMC Section 23.334.030(C), publicly-available, real-time transportation information in a common area, such as a lobby or elevator bay, on televisions, computer monitors or other displays readily visible to residents and/or visitors, shall be provided.

Transportation information shall include, but is not limited to, transit arrivals and departures for nearby transit routes.

Property owners may be required to pay administrative fees associated with compliance with this Condition.

Page 45 of 432 ends
Page 379 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 22 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx At All Times:

64. Compliance with Approved Plan. The project shall conform to the plans and statements in the Use Permit.

65. Transportation Demand Management Compliance. A Transportation Demand Management compliance report shall be submitted to the Zoning Officer, on a form acceptable to the City, prior to occupancy, and on an annual basis for ten years thereafter, which demonstrates that the project complies with the applicable requirements. After three years of timely compliant submittals, staff has the option to accept less frequent submittals (minimum one every three years). Property owners may be required to pay administrative fees associated with compliance with this Condition, pursuant to BMC Section

23.334.040(B).

66. Exterior Lighting. All exterior lighting shall be energy efficient where feasible; and shielded and directed downward and away from property lines to prevent excessive glare beyond the subject property.

67. Rooftop Projections. No additional rooftop or elevator equipment shall be added to exceed the approved maximum roof height without submission of an application for a Use Permit Modification, subject to Board review and approval.

68. Design Review. Signage and any other exterior modifications, including but not limited to landscaping and lighting, shall be subject to Design Review approval.

69. Drainage Patterns. The applicant shall establish and maintain drainage patterns that do not adversely affect adjacent properties and rights-of-way. Drainage plans shall be submitted for approval of the Building & Safety Division and Public Works Department, if required.

70. Electrical Meter. Only one electrical meter fixture may be installed per dwelling unit.

71. Loading. All loading/unloading activities associated with deliveries to all uses shall be restricted to the hours of 7:00 a.m. to 10:00 p.m. daily.

72. Residential Permit Parking. No Residential Permit Parking (RPP) permits shall be issued to project residents, nor shall commercial placards be issued to non-residential occupants and/or users of the site. The Finance Department, Customer Service Center shall add these addresses to the list of addresses ineligible for RPP permits. The property owner shall notify all tenants of rental units, and/or buyers of condominium units, of this restriction in leases and/or contracts.

73. Required Bike Parking. Secure and on-site bike parking for at least 64 bicycles (59 residential long-term, 4 residential short-term, and 1 commercial) shall be provided for the life of the building.

74. Residential Electric Vehicle (EV) Charging. Required Level 2 charging stations and low power Level 2 EV charging receptacles, as specified by the Berkeley Green Code (BMC Chapter 19.37) shall be maintained in good working condition and made available for building resident use. (Project required to meet applicable code at time of building permit application, if different from above.)

Page 46 of 432 ends
Page 380 ends

2109 VIRGINIA ST - USE PERMIT #ZP2024-0066 USE PERMIT CONDITIONS September 11, 2025 Page 23 of 23

G:\LANDUSE\Projects by Address\Virginia\2103-09\ZP2024-0066\5-FINAL PUBLIC REPORTS + ATTACHMENTS [WORD]\2025-09-11_ZAB_ATT 3_Conditions_2109 Virginia_Final.docx

75. Nonresidential Electric Vehicle (EV) Charging. Required Level 2 charging stations and DC Fast Charge stations, as specified by the Berkeley Green Code (BMC Chapter 19.37) shall be maintained in good working condition and made available for building occupant and/or visitor use. (Project required to meet applicable code at time of building permit application, if different from above.)

76. Tenant Notification. The developer shall provide tenant notification, via a lease rider or deed covenant, that each dwelling unit is located in a mixed-use area that includes commercial, food service, and entertainment uses, and that each occupant shall not seek to impede their lawful operation.

Page 47 of 432 ends
Page 381 ends

Attachment 3, Exhibit A
Mitigation Monitoring and Reporting Program

Final Environmental Impact Report 1
Mitigation Monitoring and Reporting Program
This Mitigation Monitoring and Reporting Program (MMRP) has been prepared for the City of Berkeley 2023-2031 Housing Element Update Project. The California Environmental Quality Act (CEQA) and State CEQA Guidelines require a public agency to adopt a monitoring and reporting program for ensuring compliance during project implementation with mitigation measures identified in the EIR and adopted at the time of project approval.

As stated in section 21081.6(a)(1) of the Public Resources Code:
...the public agency shall adopt a reporting or monitoring program for the changes made to the p
roject or conditions of project approval, adopted in order to mitigate or avoid significant effects on the environment.

Section 21081.6 and CEQA Guidelines Section 15097 provide general guidance for impl
ementing mitigation monitoring programs, and indicate that specific reporting and/or monitoring requirements, to be enforced during project implementation, shall be defined by the agency.

To ensure that the mitigation measures are properly implemented, this MMRP identifies the timing and responsibility for implementing and monitoring each measure. Applicants for future projects will have the responsibility for implementing the measures that apply to the proposed development activity, and the identified City of Berkeley departments will have the primary responsibility for monitoring and reporting on the implementation of the mitigation measures.

Page 48 of 432 ends
Page 382 ends

City of Berkeley
City of Berkeley 2023-2031 Housing Element Update

2 Mitigation Measure
Implementation
Procedures
Monitoring and
Reporting Action
Monitoring
Timing
Monitoring
Responsibility
Compliance
Verification
(Initial, Date,
Comments)
Air Quality
AQ-1: Construction Emissions Reduction Measures
Projects shall comply with the current Bay Area Air Quality Management District’s basic control measures for reducing construction emissions of PM10 (Table 8-2, Basic Construction Mitigation Measures Recommended for All Proposed Projects, of the May 2017 BAAQMD CEQA Guidelines), outlined below.

All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times a day.

All haul trucks transporting soil, sand, or other loose material off-site shall be covered.

All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.

All vehicle speeds on unpaved roads shall be limited to 15 miles per hour.

All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.

Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to five minutes (as required by the California Airborne Toxics Control Measure Title 13, Section 2485 of California Code of Regulations). Clear signage shall be provided for
construction workers at all access points.

All construction equipment shall be maintained and properly tuned in accordance with manufacture’s specifications. All equipment shall be checked by a certified mechanic and
Project applicants
shall comply with
BAAQMD control
measures for reducing
construction
emissions.

As part of any
grading / building
permit, ensure
control measures
are implemented
during construction.

During
construction.

City of
Berkeley
Department of
Planning &
Development,
Building &
Safety Division

Page 49 of 432 ends
Page 383 ends

Mitigation Monitoring and Reporting Program

Final Environmental Impact Report 3
Mitigation Measure
Implementation
Procedures
Monitoring and
Reporting Action
Monitoring
Timing
Monitoring
Responsibility
Compliance
Verification
(Initial, Date,
Comments)
determined to be running in proper conditions prior to
operation.

Post a publicly visible sign with the telephone number and person to contact at the Lead Agency regarding dust
complaints. This person shall respond and take corrective action within 48 hours. The Air District’s number shall also be visible to ensure compliance with applicable regulations.

AQ-2: Construction Health Risk Assessment
For projects (excluding ADUs, single-family residences, and duplexes) where construction activities would occur within 1,000 feet of sensitive receptors, would last longer than two months, and would not utilize Tier 4 and/or alternative fuel construction equipment, the project applicant shall prepare a construction health risk assessment (HRA) and implement necessary measures to reduce risk below the following BAAQMD thresholds:
 Increased cancer risk of > 10.0 in a million;
 Increased non-cancer risk of > 1.0 Hazard Index (Chronic or Acute); or
 Ambient PM2.5 increase of > 0.3 µg/m3 annual average
Project applicants shall
prepare a construction
health risk assessment
(HRA) where required
by the measure and
implement measures
as necessary to reduce
construction health
risk.

Verify HRA
completed.

Verify measures are
implemented during
construction as
needed.

Prior to
issuance of
building
permit.

During
construction as
needed.

City of
Berkeley
Department of
Planning &
Development

City of
Berkeley
Department of
Planning &
Development,
Building &
Safety Division

AQ-3: TAC Exposure Reduction Building Measures
The following design features shall be incorporated for residential development located within 1,000 feet of I-580/80 or on a lot that fronts on a section of roadway with 10,000 vehicles per day or more in order to reduce exposure of proposed residences to Project applicants shall
incorporate design
features to reduce
exposure of proposed
residences to TACs
Verify design
features to reduce
TACs have been
incorporated into
plans as appropriate.

Prior to issuance
of building
permit.

City of
Berkeley
Department of
Planning &
Development

Page 50 of 432 ends
Page 384 ends

City of Berkeley
City of Berkeley 2023-2031 Housing Element Update

4 Mitigation Measure
Implementation
Procedures
Monitoring and
Reporting Action
Monitoring
Timing
Monitoring
Responsibility
Compliance
Verification
(Initial, Date,
Comments)
TACs from vehicles and stationary combustion engines (i.e., generators):

1. If the proposed buildings would use operable windows or other sources of infiltration of ambient air, the development shall install a central HVAC system that includes high
efficiency particulate filters (HEPA). These types of filters are capable of removing approximately 99.97 percent of the
DPM emissions from air introduced into the HVAC system
(U.S. EPA 2022). The system may also include a carbon filter to remove other chemical matter. Filtration systems must operate to maintain positive pressure within the building interior to prevent entrainment of outdoor air indoors.

2. If the development limits infiltration through non-operable windows, a suitable ventilation system shall include a
ventilation system with filtration specifications equivalent to or better than the following: (1) American Society of
Heating, Refrigerating and Air- Conditioning Engineers
MERV-13 supply air filters, (2) greater than or equal to one air exchanges per hour of fresh outside filtered air, (3) greater than or equal to four air exchanges per hour
recirculation, and (4) less than or equal to 0.25 air exchanges per hour in unfiltered infiltration. These types of filtration methods are capable of removing approximately 90 percent of the DPM emissions from air introduced into the HVAC
system.

3. Windows and doors shall be fully weatherproofed with caulking and weather-stripping that is rated to last at least 20 years. Weatherproof should be maintained and replaced by the property owner, as necessary, to ensure functionality for the lifetime of the project.

4. Where appropriate, install passive (drop-in) electrostatic filtering systems, especially those with low air velocities (i.e., 1 mph).
where required by the
measure.

Inspect at project
site to confirm that
required design
features are
properly installed

During
construction

City of
Berkeley
Department of
Planning &
Development

Page 51 of 432 ends
Page 385 ends

Mitigation Monitoring and Reporting Program

Final Environmental Impact Report 5
Mitigation Measure
Implementation
Procedures
Monitoring and
Reporting Action
Monitoring
Timing
Monitoring
Responsibility
Compliance
Verification
(Initial, Date,
Comments)

5. Prepare an ongoing maintenance plan for the HVAC and filtration systems, consistent with manufacturers’
recommendations.

6. The applicant shall inform occupants regarding the proper use of any installed air filtration system.

Cultural Resources
CUL-1: Historic Context Statement, Cultural Resources Survey and Designations During the period of this Housing Element, the City should conduct a citywide historic context statement and a cultural resource survey to identify historic resources, with priority given to sites in the EIR Site Inventory, to determine if there are designed built environment features which are over 40 years of age proposed to be altered or demolished. Designation of historic or cultural resources should be conducted by the Landmarks Preservation Commission pursuant to 3.24.260 of the Berkeley Municipal Code.

The City shall conduct
a citywide historic
context statement and
a cultural resource
survey.

Verify that survey
has been completed,
designate resources
that are discovered.

During the
housing
element
period.

City of
Berkeley
Department of
Planning &
Development
Landmarks
Preservation
Commission to
make
necessary
designations

CUL-2: Historical Resources Discretionary Review
For projects that are subject to discretionary review that occur during the Housing Element period where a historical-age building or structure that has not been previously evaluated is present, a historical resources assessment shall be performed by an architectural historian or historian who meets the Secretary of the Interior Professional Qualification Standards (PQS) in architectural history or history. The qualified architectural historian or historian shall conduct an intensive-level survey in accordance with the California Office of Historic Preservation guidelines to determine if the property qualifies for federal, state, or local historical resources designation. All age eligible properties shall be evaluated within their historic context and Project applicants shall
retain a qualified
architectural historian
to perform a historical
resources assessment
for any historical-aged
building or structure
that has not been
previously evaluated.

Review and approve
the historical
resources
assessment.

During project
review.

City of
Berkeley
Department of
Planning &
Development

Page 52 of 432 ends
Page 386 ends

City of Berkeley
City of Berkeley 2023-2031 Housing Element Update

6 Mitigation Measure
Implementation
Procedures
Monitoring and
Reporting Action
Monitoring
Timing
Monitoring
Responsibility
Compliance
Verification
(Initial, Date,
Comments)
documented in a technical memorandum with Department of Parks and Recreation Series 523 Forms.

If a property is found to be a qualifying historical resource, then the project shall be subject to the City’s regulations for permit review, including by the Preservation Landmarks Commission pursuant to Chapter 3.24.260, and/or by the Zoning Adjustments Board pursuant to Chapter 23.326 of the City of Berkeley Municipal Code. Efforts shall be made to the extent feasible to ensure that impacts are mitigated. Application of mitigation shall generally be overseen by a qualified architectural historian or historic architect meeting the PQS, unless unnecessary in the circumstances (e.g., preservation in place). In conjunction with a development application that may affect the historical resource, the historical resources built environment assessment shall also identify and specify the treatment of character-defining features and construction activities.

Efforts shall be made to the greatest extent feasible to ensure that the relocation, rehabilitation, or alteration of the resource is consistent with the Secretary of the Interior’s Standards for the Treatments of Historic Properties (Standards). In accordance with CEQA, a project that has been determined to conform with the Standards generally would not cause a significant adverse direct or indirect impact to historical resources (14 CCR §
15126.4(b)(1)). Application of the Standards shall be overseen by a qualified architectural historian or historic architect meeting the PQS. In conjunction with any development application that may affect the historical resource, a report identifying and specifying the treatment of character-defining features and construction activities shall be provided to the City for review and concurrence. As applicable, the report shall demonstrate how the project complies with the Standards and be submitted to the City for review and approval prior to the issuance of permits.

If significant historical
resources are
identified, develop and
implement site-
specific mitigation
measures.

Verify site-specific
mitigation measures
have been
implemented as
needed.

During and at
completion of
construction.

Landmarks
Preservation
Commission

Page 53 of 432 ends
Page 387 ends

Mitigation Monitoring and Reporting Program

Final Environmental Impact Report 7
Mitigation Measure
Implementation
Procedures
Monitoring and
Reporting Action
Monitoring
Timing
Monitoring
Responsibility
Compliance
Verification
(Initial, Date,
Comments)
If significant historical resources are identified on a development site and compliance with the Standards and or avoidance is not possible, appropriate site-specific mitigation measures shall be established and undertaken. These may include documentation of the resource in a manner consistent with the standards of the Historic American Building Survey (HABS). Documentation should include full descriptive and historical narrative, measured drawings, and medium format photographs, all in archivally stable format.

Geology and Soils
GEO-1: Protection of Paleontological Resources
If ground disturbance below the level of prior disturbance and into native soils is proposed to occur in areas mapped as Pleistocene alluvial fan and fluvial deposits (Qpaf), Orinda Formation (Tor), or Knoxville Formation (Kjk), then the City shall require the following to be implemented:

Retention of Qualified Professional Paleontologist. Prior to initial ground disturbance, the project applicant shall retain a Qualified Professional Paleontologist, as defined by Society of Vertebrate Paleontology (SVP) (2010), to determine the project’s potential to significantly impact paleontological resources according to SVP (2010) standards.

If underlying formations are found to have a high potential for paleontological resources, the Qualified Professional
Paleontologist shall create a Paleontological Mitigation and Monitoring Program, which will be approved by the City and contain the following elements:

If underlying formations are found to have a high potential for paleontological resources, the Qualified Paleontologist shall create a Paleontological Mitigation and Monitoring Program, which will be approved by the City and contain the following elements:

On the identified soil
types:

Project applicants shall
retain a qualified
paleontologist.

Verify that qualified
paleontologist has
been retained and
measures have been
implemented.

Prior to
issuance of
grading /
building
permit,
periodically
during
construction.

City of
Berkeley
Department of
Planning &
Development

Page 54 of 432 ends
Page 388 ends

City of Berkeley
City of Berkeley 2023-2031 Housing Element Update

8 Mitigation Measure
Implementation
Procedures
Monitoring and
Reporting Action
Monitoring
Timing
Monitoring
Responsibility
Compliance
Verification
(Initial, Date,
Comments)
Paleontological Worker Environmental Awareness Program
(WEAP). Prior to the start of construction, the Qualified Professional Paleontologist or their designee shall conduct a paleontological Worker Environmental Awareness Program
(WEAP) training for construction personnel regarding the appearance of fossils and procedures for notifying paleontological staff should fossils be discovered by construction staff.

Paleontological Monitoring. Full-time paleontological monitoring shall be conducted during ground disturbing construction activities (i.e., grading, trenching, foundation work) in sediments assigned a high paleontological sensitivity. Paleontological monitoring shall be conducted by a qualified Paleontological Resources Monitor, as defined by the SVP (2010). The duration and timing of the monitoring will be determined by the Qualified Professional Paleontologist based on the observation of the geologic setting from initial ground disturbance, and subject to the review and approval by the City. If the Qualified Professional Paleontologist determines that full-time monitoring is no longer warranted, based on the specific geologic conditions once the full depth of excavations has been reached, they may recommend that monitoring be reduced to periodic spot-checking or ceased entirely. Monitoring shall be reinstated if any new ground disturbances are required, and reduction or suspension shall be reconsidered by the Qualified Professional Paleontologist at that time. In the event of a fossil discovery by the paleontological monitor or construction personnel, all work in the immediate vicinity of the find shall cease. A Qualified Professional Paleontologist shall evaluate the find before restarting construction activity in the area. If it is determined that the fossil(s) is (are) scientifically significant, the Qualified Professional Paleontologist shall complete the following conditions to mitigate impacts to significant fossil resources.

Upon completion of ground disturbing activity (and curation of fossils if necessary) the Qualified Professional Paleontologist shall prepare a final report describing the results of the paleontological Project applicants shall
implement a Worker
Environmental
Awareness Training
(WEAP) on
paleontological
resources.

Project applicants shall
hire a paleontological
resources monitor,
and if fossils are
discovered, follow
procedures for
managing resources.

Project applicants shall
prepare final
Paleontological
Monitoring report and
shall obtain review
and approval of the
report from the City of
Berkeley.

Verify that WEAP
has been completed.

Verify that qualified
paleontological
resources monitor
has been retained.

Review final
Paleontological
Monitoring report.

Prior to
issuance of
grading /
building permit

Prior to
issuance of
grading /
building
permit.

Upon
completion of
ground
disturbing
activity.

City of
Berkeley
Department of
Planning &
Development.

City of
Berkeley
Department of
Planning &
Development.

City of
Berkeley
Department of
Planning &
Development.

Page 55 of 432 ends
Page 389 ends

Mitigation Monitoring and Reporting Program

Final Environmental Impact Report 9
Mitigation Measure
Implementation
Procedures
Monitoring and
Reporting Action
Monitoring
Timing
Monitoring
Responsibility
Compliance
Verification
(Initial, Date,
Comments)
monitoring efforts associated with the project. The report shall include a summary of the field and laboratory methods, an overview of the project geology and paleontology, a list of taxa recovered (if any), an analysis of fossils recovered (if any) and their scientific significance, and recommendations. The report shall be submitted to the City. If the monitoring efforts produced fossils, then a copy of the report shall also be submitted to the designated museum repository.

Tribal Cultural Resources
TCR-1: Tribal Cultural Monitoring
For projects that are determined through tribal consultation to potentially affect tribal cultural resources, in order to mitigate potential adverse impacts to Native American cultural objects and human remains discovered during construction, tribal cultural monitors will be retained to monitor work done in areas of Tribal concern, as determined through tribal consultation. If Native American cultural objects and/or human remains are discovered during construction, work shall be halted within 100 feet of the discovery until the objects have been inspected and evaluated by tribal cultural monitors and a qualified archaeologist meeting the Professional Qualifications Standards of the Secretary of the Interior (36 CFR Part 61). The archaeologist shall, in accordance with the appropriate Guidelines, identify and evaluate the significance of the discovery and develop recommendations for treatment in consultation with the affected Tribe to ensure any impacts to the cultural resource are less than significant. The preferred mitigation is avoidance. If avoidance is not feasible, Project impacts shall be mitigated in consultation with the affected Tribe consistent with the CEQA Guidelines for
Determining the Significance of and Impacts to Cultural Resource, Archaeological Historic and Tribal Cultural Resources. Such mitigation may include, but is not limited to, additional archaeological testing, archaeological monitoring and/or an Project applicants shall
retain tribal cultural
monitors to monitor
work done in areas of
tribal concern.

Project applicants shall
retain a qualified
archaeologist to
identify and evaluate
the significance of a
discovery and develop
recommendations for
treatment in
consultation with the
affected Tribe.

Verify that a tribal
cultural monitor and
qualified
archaeologist have
been retained.

Verify that resources
are mitigated as
appropriate.

Prior to
issuance of
grading /
building permit
and during
construction as
needed.

Prior to
issuance of
grading /
building permit
and during
construction as
needed.

City of
Berkeley
Department of
Planning &
Development.

City of
Berkeley
Department of
Planning &
Development.

Page 56 of 432 ends
Page 390 ends

City of Berkeley
City of Berkeley 2023-2031 Housing Element Update

10 Mitigation Measure
Implementation
Procedures
Monitoring and
Reporting Action
Monitoring
Timing
Monitoring
Responsibility
Compliance
Verification
(Initial, Date,
Comments)
archaeological data recovery program. A Native American monitor shall be retained to monitor the ground disturbance when it is suspected that a TCR might be encountered.

Wildfire
W-1: Undergrounding of Power Drops in the VHFHSZs
The City shall require that new or upgraded power drops located in the very high fire hazard severity zone be installed underground. Prior to the issuance of a building permit, the applicant shall submit plans for undergrounding of power drops Project applicants shall
submit plans for
undergrounding of
power drops.

Verify that plans for
undergrounding of
power drops have
been submitted and
that power drops
are properly
undergrounded.

Prior to
issuance of a
building
permit;
verification
after
construction.

City of
Berkeley
Department of
Planning &
Development

1589966.3

Page 57 of 432 ends
Page 391 ends

SHATUCK AVE.

PROJECT SITE
2109 VIRGINIA
VIRGINIA ST.

WALNUT ST.

LINCOLN ST.

N.T.S.

N

VICINITY MAP

VIEW ALONG SHATTUCK LOOKING NORTHEAST
Xref .\PANORAMIC - Titleblock 24 x36.dwg

PROJECT DIRECTORY
OWNER/APPLICANT:

AMERICAN COMMONWEALTH ASSOCIATES, LP
1683 SHATTUCK AVE
BERKELEY, CA 94709
CO OWNER/APPLICANT:

PANORAMIC INTERESTS
100 BUSH STREET
SAN FRANCISCO, CA 94104
panoramic.com
ARCHITECT:

ISAIAH STACKHOUSE, PRINCIPAL

SDT ARCHITECTS
2421 FOURTH STREET
BERKELEY, CA 94710
510.649.1414
www.trachtenbergarch.com

PROJECT DESCRIPTION

ZONING CODE SUMMARY
(BASED ON THE BERKELEY MUNICIPAL ZONING CODE)
ZONING: C-NS, R2A, R4
SEE SHEET A0.1 FOR COMPLETE ZONING DATA
PROJECT ADDRESS: 2109 Virginia Street
Berkeley, CA 94709 (APN: 058 217801800)
SCOPE OF WORK:

THE PROJECT IS THE CONSTRUCTION OF A NEW 8-STORY(89'-4" TALL), 110-UNIT MIXED-USE HOUSING DEVELOPMENT WITH 112,969SF OF NEW RESIDENTIAL USE, PARKING GARAGE FOR UP TO 109 SPOTS, AND 690SF NEW COMMERCIAL SPACE. PROJECT INCLUDES REMOVAL OF EXISTING NON-LANDMARKED 2-STORY COMMERCIAL STRUCTURE AND SURFACE PARKING. 15% (9 UNITS) OF THE BASE PROJECT'S UNITS WILL BE AFFORDABLE TO VERY-LOW-INCOME HOUSEHOLDS, AND 15% (9 UNITS) WILL BE MODERATE INCOME HOUSEHOLDS, ENTITLING IT TO A 100% DENSITY BONUS, WAIVERS, AND UP TO 3 CONCESSIONS UNDER THE STATE DENSITY BONUS LAW.

DRAWING LIST

ARCHITECTURAL
SHEET NO. & TITLE
A0.0GENERAL INFORMATION
FLOOR PLANSA2.1
A2.2
A3.1BUILDING ELEVATIONS
A3.2BUILDING ELEVATIONS
A3.3
A0.1

DENSITY BONUS DIAGRAMS
A0.5SITE CONTEXT PHOTOS
A0.3A
A0.6VICINITY MAP

ZONING INFORMATION & DIAGRAMS

FLOOR PLANS

BUILDING ELEVATIONS
A3.4BUILDING ELEVATIONS
A3.5STREET STRIP ELEVATIONS

MATMATERIAL BOARD
A3.6PHOTO MATCH PERSPECTIVES
A4.1SECTIONS
A5.1PRELIMINARY GRADING PLAN

GENERAL

INFORMATION
A0.0
SHADOW STUDIESA0.4A
SHADOW STUDIESA0.4B
SHADOW STUDIESA0.4C

LANDSCAPE
L1-SSGROUND LEVEL STREETSCAPE
L2-CYSECOND LEVEL COURTYARD
A2.0ASURVEY
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET
L3-RDEIGHTH LEVEL ROOF DECK
I1.0GROUND LEVEL HYDROZONE PLAN
I2.0SECOND LEVEL HYDROZONE PLAN
I3.0EIGHTH LEVEL HYDROZONE PLAN
LANDSCAPE ARCHITECT:

INSIDEOUT DESIGN
6000 HARWOOD AVENUE
OAKLAND, CA 94618
510.655.7674
https://www.aboutinsideout.com/
A0.3CPRELIMINARY AFFORDABLE HOUSING CALCULATIONS
DENSITY BONUS CALCULATIONSA0.3B
FLOOR PLANSA2.3
A2.0BSURVEY
A3.7CONCEPTUAL RENDERING
A3.8CONCEPTUAL RENDERING
A3.9CONCEPTUAL RENDERING
A3.10CONCEPTUAL RENDERING
A3.11CONCEPTUAL RENDERING
A2.0CSITE PLAN
L4-STSTREET TREE NOTES AND DETAILS
FLOOR PLANSA2.4
FLOOR PLANSA2.5
UNIT PLANSA2.6
ATTACHMENT 1, EXHIBIT B

Page 58 of 432 ends
Page 392 ends

TRASH
96 gal
96 gal
96 gal
96 gal
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal

PATHWAY TO PUBLIC RIGHT OF WAY
96 gal
12'-1"
9'-8"

WASHER /
DRYER

WASHER /
DRYER
MEP
MAINT.

ROOF DECK

OPEN SPACE
WC
LOUNGE
750 SF
3 A4.1

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

BIKE ROOM
(59 BIKES)
18'-3" X 8'-6

TRIPLE-STACK
18'-3" X 8'-6

TRIPLE-STACK
12'-1"
9'-8"

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)

PODIUM GARDEN

WASHER /
DRYER

WASHER /
DRYER
12'-1"
9'-8"

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)
MEP
MAINT.
9'-8"
115'-0"
105'-4"9'-8"
12'-6"
36'-0"
4'-9"
2A4.1
3 A4.1
1 A4.1

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO
24"H

PLANTER
24"H

PLANTER
24"H

PLANTER
~42"H
C3 PLANTER
~42"H C3 PLANTER

PRIVATE
PATIO

PRIVATE
PATIO
24"H

PLANTER
24"H

PLANTER
24"H

PLANTER
24"H

PLANTER
200SF
3'-9"4'-0" 35'-9" 4'-0"
115'-0"

BUILDING

FOOTPRINT
21,623sf
21,623sf /
22,315sf =
97% LOT

COVERAGE
115'-0"
185'-9"
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

ZONING DATA
A0.1
LEVEL 8

OPEN SPACE DIAGRAMS REFUSE AND RECYCLING ZONING MAP

PROJECT SITE
2109 VIRGINIA
N.T.S.

N

BIKE PARKING
N

ZONING TABLES
LEVEL 2
USABLE OPEN SPACE 4,912SFUSABLE OPEN SPACE 1,030SF

LOT COVERAGE DIAGRAM

Page 59 of 432 ends
Page 393 ends

12'-1"
9'-8"

PODIUM GARDEN

WASHER /
DRYER

WASHER /
DRYER
12'-1"
9'-8"

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)
MEP
MAINT.
9'-8"
115'-0"
105'-4"9'-8"
12'-6"
36'-0"
4'-9"
2 A4.1
3 A4.1
1A4.1

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO
24"H

PLANTER
24"H

PLANTER
24"H

PLANTER
~42"H
C3 PLANTER
~42"H C3 PLANTER

PRIVATE
PATIO

PRIVATE
PATIO
24"H

PLANTER
24"H

PLANTER
24"H

PLANTER
24"H

PLANTER
200SF
3'-9"4'-0" 35'-9" 4'-0"
13'-4" SHATTUCK
75'-0" (BELOW HIGH-RISE)
PL
STAIRS
89'-4" FINISHED GRADE TO PARAPET
PL
+233.94
+228 FINISHED GRADE
8'-8" 8'-8" 8'-8" 8'-8" 8'-8" 8'-8" 8'-8"
10'-0"14'-10"
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
5'-6"
ROOF
3'-6"10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0"
T.O.PARAPET
T.O.STAIR
74'-10" LOW-RISE MEASUREMENT

ALLOWABLE ENVELOPE

OF BAY WINDOW

PROJECTIONS INTO

THE RIGHT-OF-WAY
PER CBC SECTION 3202
4'-0"
8'-0" 4'-0"
2' BALCONY

PROJECTIONS

RESIDENT

FITNESS
ROOM
GARAGE

BASEMENT
GARAGE

RAMP DOWN TO BASEMENT PARKING
BIKES
MEP
MEP
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE
8'6" x 18'
w/ 26'
AISLE

STORAGE
1 A0.3A

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)
R-2AR-4
5'-0"
5'-0"
R-2A
AREA
SEE
TABLE
R-4
AREA
SEE
TABLE
#1 UNIT#2 UNIT#3 UNIT#4 UNIT
#14 UNIT #13 UNIT
#11 UNIT
#10 UNIT
#9 UNIT
#8 UNIT
#7 UNIT
#5 UNIT
#23 UNIT
#22 UNIT
#21 UNIT
#20 UNIT
#19 UNIT
#18 UNIT
#17 UNIT
#16 UNIT
#6 UNIT
#12 UNIT
1 A0.3A
#15 UNIT
R-2AR-4
5'-0"5'-0"

ROOF DECK
3,779SF
1 A0.3A
45'-4"
91'-10"
P.L. P.L.
12'-0" 10'-0"
35'-0"
10'-0" 3'-0"

R-ZONE C-NS ZONE

ROOF DECK

BASEMENT PARKING (NOT A STORY), PROPOSED PROJECT USES A CONCESSION TO MOVE PARKING UP TO LEVEL 1 TO REDUCE COSTS 12'-1"
9'-8"

WASHER /
DRYER

WASHER /
DRYER
MEP
MAINT.

ROOF DECK

OPEN SPACE
WC
LOUNGE
750 SF
2A4.1
3 A4.1
1A4.1

WASHER /
DRYER

WASHER /
DRYER
2 A4.1
3 A4.1
1 A4.1
12'-1"
9'-8"
8TH FLOOR DECK

OPEN TO BELOW
ELEV.

OVERRUN
MECH.

EQUIPMENT
15% SOLAR
AREA
2A4.1
3 A4.1

UNOCCUPIED ROOF
1 A4.1

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)

COMMERCIAL
690 SF
GARAGE
UP TO
109 SPACES

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

RESIDENTIAL
LOBBY

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK
ELEC.

STORAGE

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK
MAIL
MEP

PACKAGES

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK
20 23

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK
TRASH
23 METERS
20 +233.94
+226.79
+228
+229
96 gal
96 gal
96 gal
96 galRESIDENT

FITNESS
ROOM

BIKE ROOM
(59 BIKES)
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal
+232

LOADING ZONE
4'-4"
190'-1"
115'-0"
185'-9"
192'-8"
115'-0"

AWNING,
TYP.

PATHWAY TO PUBLIC RIGHT OF WAY

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

LEASING

OFFICES

RESIDENT

LOUNGE /

WORK AREA

MEETING
ROOM
WC
BOH
2'-10"
5'-8"
96 gal
+228
+230
+227
2 A4.1
3A4.1
1A4.1

PROPOSED

BULB-OUT

AND SIDEWALK

SEATING
20 R-2AR-4
5'-0"
5'-0"
C-NS
AREA

SEE TABLE
R-2A
AREA
SEE
TABLE
R-4
AREA
SEE
TABLE

RAMP DOWN TO BASEMENT

PARKING

NO UNITS

IN FRONT
20'-0"

COMMERCIAL
669SF
STUDY
#3 UNIT

RESIDENTIAL

LOBBIES AND

LEASING

OFFICES
#8 UNIT
#4 UNIT
#2 UNIT
#6 UNIT
#5 UNIT
#7 UNIT
TRASH#1 UNIT
MEP
1 A0.3A

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

DENSITY BONUS

DIAGRAMS
A0.3A

PROPOSED DENSITY BONUS PROJECTBASE PROJECT

PLAN AT GROUND LEVEL
PLAN AT 2ND LEVEL
PLAN AT LEVELS 3-7
PLAN AT LEVEL 8SECTION

PLAN AT BASEMENT

PLAN AT GROUND LEVEL
PLAN AT 2ND-3RD LEVEL

PLAN AT ROOF

SECTION

PLAN AT ROOF LEVEL

Page 60 of 432 ends
Page 394 ends

Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

DENSITY BONUS

CALCULATIONS
A0.3B

Page 61 of 432 ends
Page 395 ends

DWELLING UNIT RUFA
LEGEND

RESIDENTIAL AMENITY AREA

COMMERCIAL AREA
12'-1"
9'-8"

PODIUM GARDEN

WASHER /
DRYER

WASHER /
DRYER
12'-1"
9'-8"

FRONT YARD
(VIRGINIA)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)
MEP
MAINT.
9'-8"
12'-6"
36'-0"
2 A4.1
3 A4.1
1A4.1

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO
24"H

PLANTER
24"H

PLANTER
24"H

PLANTER
~42"H
C3 PLANTER
~42"H C3 PLANTER

PRIVATE
PATIO

PRIVATE
PATIO
24"H

PLANTER
24"H

PLANTER
24"H

PLANTER
24"H

PLANTER
200SF
3'-9"4'-0" 35'-9" 4'-0"
12'-1"
9'-8"

WASHER /
DRYER

WASHER /
DRYER
MEP
MAINT.

ROOF DECK

OPEN SPACE
WC
LOUNGE
750 SF
2A4.1
3A4.1
1A4.1

COMMERCIAL
690 SF
GARAGE
UP TO
109 SPACES

RESIDENTIAL
LOBBY
ELEC.

STORAGE
MAIL
MEP

PACKAGES
20 23
TRASH
23 METERS
20 +233.94
+226.79
+228
+229
96 gal
96 gal
96 gal
96 galRESIDENT

FITNESS
ROOM

BIKE ROOM
(59 BIKES)
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal
+232

PATHWAY TO PUBLIC RIGHT OF WAY

LEASING

OFFICES

RESIDENT

LOUNGE /

WORK AREA

MEETING
ROOM
WC
BOH
96 gal
+228
+230
+227
2A4.1
3 A4.1
1A4.1
20 WASHER /
DRYER

WASHER /
DRYER
2A4.1
3 A4.1
1A4.1
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

PRELIMINARY AFFORDABLE

HOUSING CALCULATIONS
A0.3C

PLAN AT GROUND
PLAN AT LEVEL 2

PROPOSED PROJECT RESIDENTIAL UNIT

FLOOR AREA DIAGRAM
PLAN AT LEVELS 3-7
PLAN AT LEVEL 8

PROPOSED PROJECT

AREA AND UNIT CALCULATIONS

Page 62 of 432 ends
Page 396 ends

SHATUCK AVE.
2109

PROJECT
SITE
WALNUT ST.

VIRGINIA ST.

LINCOLN ST.

CEDAR ST.

SHATUCK AVE.

WALNUT ST.

VIRGINIA ST.

LINCOLN ST.
2109

PROJECT
SITE
CEDAR ST.

SHATUCK AVE.

VIRGINIA ST.

WALNUT ST.

LINCOLN ST.
2109

PROJECT
SITE
SHATUCK AVE.

VIRGINIA ST.

WALNUT ST.

LINCOLN ST.
2109

PROJECT
SITE

NEW SHADOWS CAST ON

EXISTING RESIDENTIAL
SHATUCK AVE.

VIRGINIA ST.

WALNUT ST.

LINCOLN ST.
2109

PROJECT
SITE
1640
1636
1634
1632
1628
1624
SHATUCK AVE.

VIRGINIA ST.

WALNUT ST.

LINCOLN ST.
2109

PROJECT
SITE

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING
N

SHADOW STUDIES
DECEMBER 21ST
A0.4A

WINTER SOLSTICE
DEC 21ST:
2-HRS BEFORE SUNSET (PM)

WINTER SOLSTICE
DEC 21ST:

NOON

WINTER SOLSTICE
DEC 21ST:
2-HRS AFTER SUNRISE (AM)
2SHADOW STUDY AXONOMETRIC - AM
N.T.S.
4SHADOW STUDY AXONOMETRIC - NOON
NT.S.
6SHADOW STUDY AXONOMETRIC - PM
N.T.S.

N
N
3SHADOW STUDY - NOON
1:240 @ 11X17 1:120 @ 24X36
5SHADOW STUDY - PM
1:240 @ 11X17 1:120 @ 24X36
1SHADOW STUDY - AM
1:240 @ 11X17 1:120 @ 24X36
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

Page 63 of 432 ends
Page 397 ends

SHATUCK AVE.
2109

PROJECT
SITE
WALNUT ST.

VIRGINIA ST.

LINCOLN ST.

CEDAR ST.

SHATUCK AVE.

WALNUT ST.

VIRGINIA ST.

LINCOLN ST.
2109

PROJECT
SITE
CEDAR ST.

SHATUCK AVE.

VIRGINIA ST.

WALNUT ST.

LINCOLN ST.
2109

PROJECT
SITE
SHATUCK AVE.

VIRGINIA ST.

WALNUT ST.

LINCOLN ST.
2109

PROJECT
SITE

NEW SHADOWS CAST ON

EXISTING RESIDENTIAL
SHATUCK AVE.

VIRGINIA ST.

WALNUT ST.

LINCOLN ST.
2109

PROJECT
SITE
1640
1636
1634
SHATUCK AVE.

VIRGINIA ST.

WALNUT ST.

LINCOLN ST.
2109

PROJECT
SITE

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING
N

SHADOW STUDIES
JUNE 21ST
A0.4B

SUMMER SOLSTICE
JUN 21ST:
2-HRS BEFORE SUNSET (PM)

SUMMER SOLSTICE
JUN 21ST:

NOON

SUMMER SOLSTICE
JUN 21ST:
2-HRS AFTER SUNRISE (AM)
2SHADOW STUDY AXONOMETRIC - AM
N.T.S.
4SHADOW STUDY AXONOMETRIC - NOON
NT.S.
6SHADOW STUDY AXONOMETRIC - PM
N.T.S.

N
N
3SHADOW STUDY - NOON
1:240 @ 11X17 1:120 @ 24X36
5SHADOW STUDY - PM
1:240 @ 11X17 1:120 @ 24X36
1SHADOW STUDY - AM
1:240 @ 11X17 1:120 @ 24X36
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

Page 64 of 432 ends
Page 398 ends

SHATUCK AVE.
2109

PROJECT
SITE
WALNUT ST.

VIRGINIA ST.

LINCOLN ST.

CEDAR ST.

SHATUCK AVE.

WALNUT ST.

VIRGINIA ST.

LINCOLN ST.
2109

PROJECT
SITE
CEDAR ST.

SHATUCK AVE.

VIRGINIA ST.

WALNUT ST.

LINCOLN ST.
2109

PROJECT
SITE
SHATUCK AVE.

VIRGINIA ST.

WALNUT ST.

LINCOLN ST.
2109

PROJECT
SITE

NEW SHADOWS CAST ON

EXISTING RESIDENTIAL
SHATUCK AVE.

VIRGINIA ST.

WALNUT ST.

LINCOLN ST.
2109

PROJECT
SITE
1640
1636
1634
SHATUCK AVE.

VIRGINIA ST.

WALNUT ST.

LINCOLN ST.
2109

PROJECT
SITE

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING

LIGHTER TONE GREY INDICATES SHADOWS

FROM PROPOSED BUILDING

DARK TONE GREY INDICATES SHADOWS

FROM EXISTING BUILDINGS

ALL RESIDENTIAL BUILDINGS BEING

SHADOWED SHOWN IN THESE DIAGRAMS

NEW SHADOW AT RESIDENTIAL BUILDING
N

SHADOW STUDIES
MAY 31ST
A0.4C

CURRENT
MAY 31ST:
2-HRS BEFORE SUNSET (PM)

CURRENT
MAY 31ST:

NOON

CURRENT
MAY 31ST:
2-HRS AFTER SUNRISE (AM)
3SHADOW STUDY - NOON
1:240 @ 11X17 1:120 @ 24X36
5SHADOW STUDY - PM
1:240 @ 11X17 1:120 @ 24X36
1SHADOW STUDY - AM
1:240 @ 11X17 1:120 @ 24X36
2SHADOW STUDY AXONOMETRIC - AM
N.T.S.
4SHADOW STUDY AXONOMETRIC - NOON
NT.S.
6SHADOW STUDY AXONOMETRIC - PM
N.T.S.

N
N
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

Page 65 of 432 ends
Page 399 ends

SITE CONTEXT
PHOTOS
A0.5
1 -
GOOGLE EARTH BIRD'S EYE CONTEXT VIEW 3
-

VIEW FROM VIRGINIA LOOKING WEST
4 -
VIEW FROM SHATTUCK LOOKING SOUTH2
-

VIEW FROM SHATTUCK LOOKING NORTH
125 SHATTUCK

3STORY MIXED USE
210
9IRGINIA

PROJECT SITE
10 SHATTUCK

2STORY MIXEDUSE

1 SHATTUCK

COMMERCIAL

2112 9IRGINIA

2STORY

MULTIFAMILY
210
9IRGINIA

PROJECT SITE
100 WALNUT

2STORY

MULTIFAMILY

150 WALNUT

2 STORY
MIXEDUSE

10

SHATTUCK

4STORY

MULTIFAMILY

210
9IRGINIA

PROJECT SITE
10

SHATTUCK

4STORY MULTIFAMILY

100 SHATTUCK

2STORY COMMERCIAL

PROJECT SITE
210
9IRGINIA
1 SHATTUCK

2STORY MIXEDUSE

Berkeley, CA

PANORAMIC
1685

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2109 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

12.11.2023 SB330 SUBMISSION

04.30.2024 STRUCTURAL CONCEPT

05.31.2024 ZONING APPLICATION
25 25
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION

05.02.2025 DRC HEARING SET

07.10.2025 ZAB HEARING SET

Page 66 of 432 ends
Page 400 ends

1740
1728
1722
1710
1704
1700
1709
2514
2109
1625
1619
1748
1730
1720
1708
1700
1686
1670
1666
1660
1652
1650
2018
2022
2032
2111
1650
1640
1636
1634
1632
1628
1624
1620
4-STORY

MULTIFAMILY
3-STORY
MULTIFAM.
2-STORY
MULTIFAM.
2-STORY
MULTIFAM.
4-STORY
MULTIFAM.
2-STORY

RESIDENTIAL
2-STORY

RESIDENTIAL
2-STORY
MULTIFAM.
1-STORY
COMM.
1-STORY
COMM.
1-STORY
COMM.
2-STORY

COMMERCIAL
2-STORY

COMMERCIAL
2-STORY
MULTIFAM. 2-STORY
MULTIFAM.
4-STORY

MULTIFAMILY
2-STORY
RES. 2-STORY
RES. 2-STORY
RES. 2-STORY
RES. 3-STORY
MULTIFAM.4-STORY
SHATUCK AVE.

VIRGINIA ST.

PROJECT SITE
2109 VIRGINIA
WALNUT ST.

LINCOLN ST.

PARKING
2-STORY

COMMERCIAL
2-STORY

RESIDENTIAL
2-STORY

RESIDENTIAL
2-STORY

RESIDENTIAL
2-STORY

COMMERCIAL
2-STORY

RESIDENTIAL
2-STORY

RESIDENTIAL
2-STORY

RESIDENTIAL
2-STORY

COMMERCIAL
2-STORY

COMMERCIAL
2-STORY

COMMERCIAL
2-STORY

COMMERCIAL
1-STORY
COMM.

COMM.
3-STORY

COMMERCIAL
1-STORY

COMMERCIAL
2141
1643
1639
1635
1631
1629
1623
1619
1618
2141
2143
2151
1686
2015
1700
2024
1650
2043 2039
2037
2031
2025
2021
1607
2-STORY
MULTIFAM.
2-STORY
MULTIFAM.
2-STORY
MULTIFAM.
2-STORY
MULTIFAM.
2-STORY
MULTIFAM.
2-STORY

RESIDENTIAL
2-STORY

RESIDENTIAL
MULTIFAM.
2-STORY
MULTIFAM.
2-STORY
MULTIFAM.
1700

STUDENT
GARDEN

COMMERCIAL
2-STORY
RES.
2-STORY
RES. 2-STORY
RES. 2-STORY
RES. 2-STORY
RES. 2-STORY
RES.
2-STORY

COMMERCIAL
2-STORY
MULTIFAM.
2-STORY
RES. 2-STORY
MULTIFAM.
2-STORY

COMMERCIAL

VICINITY MAP
A0.6
1 -

VICINITY MAP
NTS
N
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

Page 67 of 432 ends
Page 401 ends

Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET
SURVEY
A2.0a

Page 68 of 432 ends
Page 402 ends

Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET
SURVEY
A2.0b

Page 69 of 432 ends
Page 403 ends

115'-0"
198'-0"
+232

LOADING ZONE
115'-0"
190'-1"

PROPOSED

BUILDING

FOOTPRINT

EXISTING

BUILDING

FOOTPRINT
185'-9"4'-4"
192'-8"5'-2"
2'-9"
76'-2" 118'-3"
58'-7" 56'-5"
15'-0"

FRONT SETBACK
2'-0"

PATHWAY
APN 058-2178-013

C-NS ZONE
R-4 ZONE R-2A ZONE

NEIGHBORING
BUILDING WITHIN 20'

NEIGHBORING
BUILDING WITHIN 20'
20'-0"
20'-0"

PROPOSED

UPPER LEVEL

BOUNDARY
6'-0"

INTERIOR

SETBACK

PROPOSED BULB-OUT

AND SIDEWALK

SEATING

PATHWAY BALCONIES
SHATUCK AVE.

VIRGINIA ST.
2109 VIRGINIA

EXISTING

COMMERCIAL USE
R-4
(COMMERCIAL USE)
R-4
(RESIDENTIAL USE)
R-2A
(RESIDENTIAL USE)
C-NS
(COMMERCIAL USE)
R-2A
(RESIDENTIAL USE)
R-2A
(RESIDENTIAL USE)
(RESIDENTIAL USE)

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)
+/- 70'-6"
24"H

PLANTER

INTERIOR

SETBACK
4'-0"
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

PROPOSED SITE
PLAN
A2.0c -
-

SITE PLAN
3/32" = 1'-0"-8 04
N

Page 70 of 432 ends
Page 404 ends

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)

COMMERCIAL
690 SF
GARAGE
UP TO
109 SPACES

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

RESIDENTIAL
LOBBY

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK
ELEC.

STORAGE

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK
MAIL
MEP

PACKAGES

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK
20 23

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK
TRASH
23 METERS
20 +233.94
+226.79
+228
+229
96 gal
96 gal
96 gal
96 galRESIDENT

FITNESS
ROOM

BIKE ROOM
(59 BIKES)
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal
+232

LOADING ZONE
4'-4"
115'-0"
198'-0"
190'-1"
115'-0"
185'-9"
192'-8"
5'-2"
115'-0"

AWNING,
TYP.

PATHWAY TO PUBLIC RIGHT OF WAY

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

PARKLIFT
KLAUS 4300
18'-3" X 8'-6 3
8"

TRIPLE-STACK

LEASING

OFFICES

RESIDENT

LOUNGE /

WORK AREA

MEETING
ROOM
WC
BOH
2'-10"
5'-8"
96 gal
+228
+230
+227
2 A4.1
3 A4.1
1 A4.1

PROPOSED

BULB-OUT

AND SIDEWALK

SEATING
20 Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

PROPOSED
FLOOR
PLAN
A2.1 -
-

PLAN AT GROUND LEVEL
3/32" = 1'-0"-8 04
N

Page 71 of 432 ends
Page 405 ends

12'-1"
9'-8"

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)

PODIUM GARDEN

WASHER /
DRYER

WASHER /
DRYER
12'-1"
9'-8"

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)
MEP
MAINT.
9'-8"
198'-0"
115'-0"
190'-1"
105'-4"
186'-2"
180'-8"
35'-2"
115'-0"
34'-4"35'-6"
9'-8"
12'-6"
69'-0" 36'-0" 69'-0" 12'-1"
4'-9"
2 A4.1
3 A4.1
1 A4.1

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO

PRIVATE
PATIO
24"H

PLANTER
24"H

PLANTER
24"H

PLANTER
~42"H
C3 PLANTER
~42"H C3 PLANTER

PRIVATE
PATIO

PRIVATE
PATIO
24"H

PLANTER
24"H

PLANTER
24"H

PLANTER
24"H

PLANTER
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

PROPOSED
FLOOR
PLAN
A2.2
8 04
-
-
PLAN AT LEVEL 2 PODIUM
3/32" = 1'-0"-
N

Page 72 of 432 ends
Page 406 ends

WASHER /
DRYER

WASHER /
DRYER
12'-1"
9'-8"

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)
MEP
MAINT.
2 A4.1
3 A4.1
1 A4.1
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

PROPOSED
FLOOR
PLAN
A2.3 -
-
PLAN AT LEVELS 3-7
3/32" = 1'-0"-8 04
N

Page 73 of 432 ends
Page 407 ends

12'-1"
9'-8"

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)

WASHER /
DRYER

WASHER /
DRYER
12'-1"
9'-8"

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)
MEP
MAINT.

ROOF DECK

OPEN SPACE
WC
LOUNGE
750 SF
2 A4.1
3 A4.1
1 A4.1
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

PROPOSED
FLOOR
PLAN
A2.4 -
-
PLAN AT LEVEL 8
3/32" = 1'-0"-8 04
N
N

Page 74 of 432 ends
Page 408 ends

12'-1"
9'-8"

FRONT YARD
(VIRGINIA)

STREET SIDE YARD (SHATTUCK)

REAR YARD

INTERIOR SIDE YARD (ABUTS RESIDENTIAL)
12'-1"
9'-8"
8TH FLOOR DECK

OPEN TO BELOW
ELEV.

OVERRUN
MECH.

EQUIPMENT
15% SOLAR
AREA
2 A4.1
3 A4.1

UNOCCUPIED ROOF
1 A4.1
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

PROPOSED
ROOF
PLAN
A2.5 -
-

PLAN AT ROOF
3/32" = 1'-0"-8 04
N

Page 75 of 432 ends
Page 409 ends

2BR PLUS OFFICE
1,000 SF
1BR
677 SF
STUDIO
485 SF
17'-0"
30'-6"
30'-6"
30'-6"
34'-4"
11'-6"11'-0"
2BR CORNER UNIT AT WEST
1,075 SF
1BR AT COURTYARD
706 SF

WASHER /
DRYER
11'-9"11'-2"6'-5"
31'-4"
6'-8"9'-4"
10'-6"22'-6"
34'-6"
13'-3"
11'-0" 8'-2" 10'-10"
19'-6"
32'-0"
24'-0"
2BR CORNER UNIT AT EAST
1,075 SF
10'-6"22'-6"
34'-6"
13'-3"
11'-0" 8'-2" 10'-10"
19'-6"
32'-0"
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

PROPOSED
UNIT
PLANS
A2.6 -
-

TYPICAL UNIT PLANS
3/32" = 1'-0"-8 04

Page 76 of 432 ends
Page 410 ends

15'-10" 10'-0"
ROOF

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

SIXTH FLOOR

SEVENTH FLOOR

PARAPET
89'-4" TO ROOF
3'-6"5'-6"
T.O. STAIR

EIGHTH FLOOR
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0"

BUILDING

ELEVATIONS
A3.1
1 A3.1

WEST ELEVATION
1/16"=1'-0" @ 11X17 1/8" = 1'-0" @ 24X36
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET
8 0416

Page 77 of 432 ends
Page 411 ends

15'-10" 10'-0"
ROOF

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

SIXTH FLOOR

SEVENTH FLOOR

PARAPET
89'-4" TO ROOF
3'-6"5'-6"
T.O. STAIR

EIGHTH FLOOR
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0"
(SHATTUCK)

BUILDING

ELEVATIONS
A3.2
1 A3.2

SOUTH ELEVATION
1/16"=1'-0" @ 11X17 1/8" = 1'-0" @ 24X36
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET
8 0416

Page 78 of 432 ends
Page 412 ends

15'-10" 10'-0"
ROOF

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

SIXTH FLOOR

SEVENTH FLOOR

PARAPET
89'-4" TO PARAPET
3'-6"5'-6"
T.O. STAIR

EIGHT FLOOR
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0"

BUILDING

ELEVATIONS
A3.3
1 A3.3

EAST ELEVATION
1/16"=1'-0" @ 11X17 1/8" = 1'-0" @ 24X368 0416
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

Page 79 of 432 ends
Page 413 ends

(SHATTUCK)
15'-10" 10'-0"
ROOF

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

SIXTH FLOOR

SEVENTH FLOOR

PARAPET
89'-4" TO ROOF
3'-6"5'-6"
T.O. STAIR

EIGHTH FLOOR
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0"

BUILDING

ELEVATIONS
A3.4
1 A3.4

NORTH ELEVATION
1/16"=1'-0" @ 11X17 1/8" = 1'-0" @ 24X36
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET
8 0416

Page 80 of 432 ends
Page 414 ends

(SHATTUCK AVE)
1650 WALNUT ST
1686 SHATTUCK AVE.
(WALNUT ST.)
(VIRGINIA)1709 SHATTUCK AVE.
1625 SHATTUCK AVE. 1619 SHATTUCK AVE.
2109 VIRGINIA

STREET STRIP

ELEVATIONS
A3.5
1 -
SHATTUCK AVE.
1/32"=1'-0" @ 11X17 1/16" = 1'-0" @ 24X36
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET
4 016
2 -
VIRGINIA ST.
1/32"=1'-0" @ 11X17 1/16" = 1'-0" @ 24X36
32 8
4 01632 8

Page 81 of 432 ends
Page 415 ends

PHOTO MATCH
VIEWS
A3.6
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET
1 -

VIRGINIA LOOKING WEST - BEFORE
2 -

VIRGINIA LOOKING WEST - AFTER
3 A3.6

SHATTUCK LOOKING SOUTH - BEFORE
4 A3.6

SHATTUCK LOOKING SOUTH - AFTER

Page 82 of 432 ends
Page 416 ends

CONCEPTUAL

RENDERING
A3.7
1 -

PERSPECTIVE VIEW - SHATTUCK LOOKING NORTHEAST
-
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

Page 83 of 432 ends
Page 417 ends

CONCEPTUAL

RENDERING
A3.8
1 -

PERSPECTIVE VIEW - SHATTUCK LOOKING NORTHEAST
-
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

Page 84 of 432 ends
Page 418 ends

CONCEPTUAL

RENDERING
A3.9
1 -

SIDEWALK VIEW - SHATTUCK LOOKING NORTH
-
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

Page 85 of 432 ends
Page 419 ends

CONCEPTUAL

RENDERING
A3.10
1 -

PERSPECTIVE VIEW - SHATTUCK LOOKING SOUTHEAST
-
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET

Page 86 of 432 ends
Page 420 ends

CONCEPTUAL

RENDERING
A3.11
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET
1 -

PERSPECTIVE VIEW - VIRGINIA LOOKING WEST
-

Page 87 of 432 ends
Page 421 ends

VIRGINIA
PL
229.6
13'-4"
75'-0" (BELOW HIGH-RISE)
STAIRS
10'-0"
89'-4" FINISHED GRADE TO PARAPET
12'-10"
PL
1625 SHATTUCK
+229.72
+228
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7

FINISHED GRADE
LEVEL 8
5'-6"
ROOF
3'-6"
STAIRS
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0"
T.O.PARAPET
T.O.STAIR
230
ELEC.GARAGE
13'-4" SHATTUCK
75'-0" (BELOW HIGH-RISE)
PL
STAIRS
89'-4" FINISHED GRADE TO PARAPET
PL
1650 WALNUT ST.
+233.94
+228 FINISHED GRADE
8'-8" 8'-8" 8'-8" 8'-8" 8'-8" 8'-8" 8'-8"
10'-0"14'-10"
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
5'-6"
ROOF
3'-6"10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0"
T.O.PARAPET
T.O.STAIR
74'-10" LOW-RISE MEASUREMENT

ALLOWABLE ENVELOPE

OF BAY WINDOW

PROJECTIONS INTO

THE RIGHT-OF-WAY
PER CBC SECTION 3202
4'-0"
8'-0" 4'-0"
2' BALCONY

PROJECTIONS

RESIDENT

FITNESS
ROOM
GARAGE
P.L. P.L.
14'-10" 3'-6"

R-ZONE C-NS ZONE
8TH FLOOR DECK
LEVEL 2

FINISHED GRADE
10'-0" 10'-0" 10'-0"10'-0" 10'-0"10'-0" 10'-0" 10'-0"
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
T.O ROOF
89'-4" FINISHED GRADE TO PARAPET
T.O. PARAPET
10'-0"
ROOF

SHATTUCK

COMMERCIALSTORAGE
+227+228 +230
ELEC.

Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET
3 -

NORTH SOUTH SECTION
1/16" = 1'-0"-
2 -

EAST WEST SECTION
1/16" = 1'-0"-

PROPOSED

SECTIONS
A4.1
1 -

EAST WEST SECTION
1/16" = 1'-0"-

Page 88 of 432 ends
Page 422 ends

+233.94
+226.79
+228
+229
+232

LOADING ZONE
28'-1"
115'-0"
198'-0"
190'-1"
73'-4"
157'-8"
152'-1"20'-0"
34'-2"
+228
+230 +227
+219.33
+219.33
+228
32'-8" 13'-1" 35'-1"
20'-8"
115'-0"
41'-8"
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET
1 -

PRELIMINARY GRADING PLAN
1/16" = 1'-0"-

PRELIMINARY

GRADING PLAN
A5.1

Page 89 of 432 ends
Page 423 ends

15'-10" 10'-0"
ROOF

FIFTH FLOOR

FOURTH FLOOR

THIRD FLOOR

SECOND FLOOR

GROUND FLOOR

SIXTH FLOOR

SEVENTH FLOOR

PARAPET
89'-4" TO ROOF
3'-6"5'-6"
T.O. STAIR

EIGHTH FLOOR
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0"

BUILDING

MATERIALS
MAT
1 -

WEST ELEVATION
1/16"=1'-0" @ 11X17 1/8" = 1'-0" @ 24X36

METAL INFILL
PANELS

ALUMINUM

WINDOWS
Berkeley, CA

PANORAMIC
1685

SHATTUCK/
2109 VIRGINIA

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2341 JOB:

SHEET:

12.11.2023 SB330 SUBMISSION

05.31.2024 ZONING APPLICATION

09.18.2024 ZONING RESUBMISSION

04.02.2025 ZONING RESUBMISSION
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.sdtarch.com
DE LA PEÑA

TRACHTENBERG

ARCHITECTS

STACKHOUSE

05.02.2025 DRC HEARING SET

07.24.2025 ZAB HEARING SET
8 0416

ALUMINUM

STOREFRONT
WINDOW

THIN BRICK

WOOD LOOK
SIDING

THIN BRICK

WOOD LOOK SIDING

METAL INFILL
PANEL

DECORATIVE METAL

BALCONY

DECORATIVE METAL

BALCONY

Page 90 of 432 ends
Page 424 ends

96 gal
96 gal
96 gal
96 gal
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal
96 gal

V I R G I N I A S T R E E T
4' x 8' WELLS FOR SMALLER

TREES AT VIRGINIA ST
3' X 3' SCORING

PATTERN PER

CITY STANDARDS

S H A T T U C K A V E N U E

CURB RAMP AND

CROSSING PER CITY AND
PROWAG STANDARDS, TYP.

BICYCLE RACK (2 SPACES), TYP.
-ALL BICYCLE PARKING TO BE

SPECIFIED AND INSTALLED PER
Berkeley Bicycle Plan - Appendix F -
Facility Design Toolbox
TREE WELLS EXPANDED TO 4' x 12'

WHERE UTILITIES PERMIT
-Filled w/ Flexi-Pave per City arborist
(E) STREET TREE AT SHATTUCK AVE
(5) TO REMAIN AND BE PROTECTED:
-ASH SPP.
(City Trees site unavailable as of 3.19.25)
(E) TREE TO BE REMOVED DUE

TO CONFLICT WITH PROPOSED

CURB CUT

LOW PERIMETER

PLANTING

PROPOSED STREET TREE
AT VIRGINIA STREET (2):
-WESTERN REDBUD STF
(Cercis occidentalis)

PENDING APPROVAL OF

CITY ARBORIST

STEEL RAISED

PLANTER SHIELDS

SEATING FROM STREET
-Powdercoat color
per Arch

WOOD BENCH
BISTRO TABLE + SEATS
L1-SS
NorthNorth
Berkeley, CA

PANORAMIC
1685

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2109 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

12.11.2023 SB330 SUBMISSION

04.30.2024 STRUCTURAL CONCEPT

05.31.2024 ZONING APPLICATION

09.13.2024 ZONING SUBMITTAL

04.01.2025 ZONING RESUBMITTAL

07.24.2025 ZAB HEARING SET
Ground Level
Streetscape and UOS
00081632 0
1/16" = 1'-0"
A
A
B
D
per Berkeley Bicycle Plan - Appendix F - Facility Design ToolboxB C
C
D
E
CC
D
E
C

Page 91 of 432 ends
Page 425 ends

SPECIMEN TREE

SEATING PODSSMALL ACCENT TREE PEDESTAL PAVERSWOOD BENCHES

IN-GROUND PLANTING
42" TALL PLANTER

PRIVATE PATIO
233 SQFT

GROUNDCOVER MIX OF

EK, ID AND SA
24" TALL PLANTER
NorthNorth
Berkeley, CA

PANORAMIC
1685

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2109 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

12.11.2023 SB330 SUBMISSION

04.30.2024 STRUCTURAL CONCEPT

05.31.2024 ZONING APPLICATION

09.13.2024 ZONING SUBMITTAL

04.01.2025 ZONING RESUBMITTAL

07.24.2025 ZAB HEARING SET
L2-CY
Second Level
Courtyard
A
B
C
0004816 0
1/8"=1'-0"
A
B
D

MATCH LINE

MATCH LINE
E
C
D
E
F
F

Page 92 of 432 ends
Page 426 ends

ACCENT TREE:

MEYER LEMON

BAR HEIGHT TABLES

BUFFER PLANTING

BUILT-IN BENCH

PROPANE FIRE PIT

PEDESTAL PAVERS

BISTRO LIGHTS
LOW PLANTING:SMALL SUCCULENTS

BAR HEIGHT TABLES

PARAPET BY ARCHITECT

CUTTING GARDENAPPLE ESPALIERPASSIONFRUIT VINEBELOW PARAPET VEGGIES AND HERBS ATADA PLANTING TABLECOMMUNITY GARDEN MUNSTEAD ENGLISHLAVENDER Berkeley, CA

PANORAMIC
1685

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2109 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

12.11.2023 SB330 SUBMISSION

04.30.2024 STRUCTURAL CONCEPT

05.31.2024 ZONING APPLICATION

09.13.2024 ZONING SUBMITTAL

04.01.2025 ZONING RESUBMITTAL

07.24.2025 ZAB HEARING SET
L3-RD
Eighth Level
Roof Deck
4 028 NorthNorth
1/4" = 1'-0"
A
A
K H

RESIDENTIAL
LOUNGE
I
D
C
G
BC
D
E
F
GGIJK
B
C
E
F
J
H

Page 93 of 432 ends
Page 427 ends

L4-ST
Berkeley, CA

PANORAMIC
1685

SHATTUCK

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2109 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

12.11.2023 SB330 SUBMISSION

04.30.2024 STRUCTURAL CONCEPT

05.31.2024 ZONING APPLICATION

09.13.2024 ZONING SUBMITTAL

04.01.2025 ZONING RESUBMITTAL

07.24.2025 ZAB HEARING SET
Street Tree Notes and
Details
STREET TREE COORDINATION NOTES:
a)

PROPOSED STREET TREE SPECIES, LOCATION, AND CONDITIONS SUBJECT TO ONGOING REVIEW AND APPROVAL BY THE CITY OF BERKELEY'S MANAGING CONSULTING URBAN FORESTER AND ARBORIST.

PROPOSED STREET TREES ARE
CURRENT WITH EXISTING UTILITIES AS OF xx.xx.2024 AND

WILL BE SUBJECT TO ADDITIONAL REVIEW AFTER PROPOSED
UTILITIES ARE FINALIZED.
b)

TREE PROTECTION FENCING LOCATIONS AND DETAILS TO BE ADDED TO THE DEMOLITION PLAN IN BUILDING PERMIT SET.
c)
CLEARANCE PRUNING REQUIRES PRIOR APPROVAL OF THE CITY. APPROVED CLEARANCE PRUNING SHALL BE COMPLETED IN ACCORDANCE WITH THE LATEST EDITIONS OF THE BEST MANAGEMENT PRACTICESFOR PRUNING (INTERNATIONAL SOCIETY OF ARBORICULTURE) AND THE AMERICAN NATIONAL STANDARD FORTREE CARE OPERATIONS (Z133.1) AND PRUNING (A300, PART 1). TREES SHALL NOT BE TOPPED OR HEADEDBACK. TREE PRUNING SHALL BE COMPLETED TO REDUCE LIMBS FOR CLEARANCE WHILE MAKING THESMALLEST CUTS POSSIBLE . TREE PRUNING SHOULD BE LIMITED TO MINOR BRANCHES. BRANCH REMOVAL OR REDUCTION CUTS (THINNING CUTS) ARE TO BE EMPLOYED RATHER THAN HEADING CUTS. d)

ALL EXISTING STREET TREES (INCLUDING ANY OF THEIR BRANCHES) ADJACENT TO PLANNED CONSTRUCTION SCAFFOLDING MUST BE PROTECTED FROM MECHANICAL INJURY. e)

ROOT PRUNING REQUIRES PRIOR APPROVAL OF THE CITY AND SHALL BE SUPERVISED BY THE PROJECT ARBORIST.

SEE NOTES BELOW FOR MORE INFORMATION.

STREET TREE PROTECTION DURING CONSTRUCTION NOTES:
a)

ALL TREE PROTECTION REQUIREMENTS AND RESTRICTIONS SHALL BE INCLUDED IN THE CONSTRUCTION NOTES AND PRINTED ON ALL COPIES OF THE PLANS. INCLUDE THE NAME AND PHONE NUMBER OFTHE PARTY THAT WILL MONITOR THE SITE AND ENSURE THE TREE PROTECTION MEASURES AREBEING FOLLOWED; AND WHAT THE MONITORING SCHEDULE WILL BE:

NAME / PHONE / SCHEDULE
b)
TREE PROTECTION ZONES: THE CALCULATED TREE PROTECTION ZONE IS THE ENTIRE DRIPLINE OF THE TREES.

THE SPECIFIED TREE PROTECTION ZONE IS THE ENTIRE PARKWAY (TREE WELL).

NO GRADING, EXCAVATION, CONSTRUCTION OR STORAGE OF MATERIALS SHALL OCCUR WITHIN THE SPECIFIED TREE PROTECTION ZONE. NO UNDERGROUND SERVICESINCLUDING UTILITIES, SUB-DRAINS, WATER OR SEWER SHALL BE PLACED IN THE TREEPROTECTION ZONE. c)
TREE PROTECTIONS: ADD TREE PROTECTION FENCING TO PROTECT THE EXPOSED DRIPLINE WITHIN THE PARKWAY (FIGURE 2).

INSTALL 6 FOOT CHAIN-LINK OR WOOD FENCING TO
PROTECT THE AREA WITHIN THE TREE WELL OF ANY PROTECTED TREE IN THE DEVELOPMENT AREA. FENCINGSHALL BE MOUNTED TO POSTS THAT ARE DRIVEN INTO THE GROUND (SEE FIGURES 2 AND 3).

ALL STREET

TREE PROTECTION FENCING MUST PROTECT ENTIRE EXPOSED SOIL AREA WITHIN EACH TREE WELL. WHERE THIS IS NOT POSSIBLE BECAUSE OF EXISTING STRUCTURES, TREE ROOTS, OR OTHER OBSTACLES, CHAIN-LINK PANELS MOUNTED TO STANCHIONS AND CONNECTED TO EACH OTHER MAY BEAPPROVED. IN AREAS WHERE DIFFICULT TERRAIN MAKES THIS IMPRACTICAL, ORANGE CONSTRUCTIONFENCING MAY BE APPROVED. d)

ALL FENCING SHALL HAVE SIGNAGE STATING THE REQUIREMENTS AND RESTRICTIONS, AND THE CONTACT INFORMATION FOR THE PROJECT ARBORIST.
e)

WHEN ANY APPROVED CONSTRUCTION ACTIVITY WILL OCCUR WITHIN THE DRIP LINE OF A PROTECTED TREE THAT IS NOT SURROUNDED BY PROTECTIVE FENCING, THE TRUNK SHALL BE PROTECTED BY WRAPPING ITWITH STRAW TUBES (WATTLE) OR VERTICAL WOOD SLATS (EX. 2X4), UP TO A MINIMUM OF 8 FEET FROM GRADE (SEE FIGURE 1, PAGE 6). SLATS SHALL BE ANGLED TO PROTECT THE ROOT FLARE AT THE BASE OF THE TREE; AND CLOSED CELL FOAM OR EQUIVALENT MATERIAL SHALL BE USED TO PROTECT THE TRUNK OF THETREE WHERE IT CONTACTS THE SLATS. LATERAL BRANCHES BELOW 8 FEET SHALL ALSO BE PROTECTED. IN ADDITION, THE AREA SHALL BE COVERED WITH A 6 INCH LAYER OF MULCH TOPPED WITH 3/4 INCH PLYWOODTHAT IS FASTENED TOGETHER. IF ANY LARGE OR MOTORIZED EQUIPMENT (MINI EXCAVATOR, BOBCAT®,POWERED WHEELBARROW) WILL TRAVEL OVER THIS AREA, THE PLYWOOD MUST BE A MINIMUM OF 1 INCHAND ADEQUATE FOR THE WEIGHT OF THE EQUIPMENT THAT WILL TRAVEL OVER IT. IF LARGER EQUIPMENT(BACKHOE, TRACTOR) WILL BE USED, CONSULT THE CITY ARBORIST.

CONSTRUCTION ACTIVITY REFERS TO ANY
MOVEMENT OF PEOPLE, TOOLS, OR EQUIPMENT; OR STORAGE OF ANY TOOLS, EQUIPMENT, OR SUPPLIES. f)
IRRIGATION: ADD IRRIGATION TO WET THE SOIL IN THE PARKWAY TO A DEPTH OF 12 INCHES. ONCE SOIL IS AT FIELD CAPACITY, IRRIGATION CAN BE SCALED BACK TO REPLACE THEWATER LOST THROUGH EVAPOTRANSPIRATION (ET). g)
MULCH: ADD 4 - 6 INCHES OF COURSE ORGANIC MULCH. THE MULCH SHOULD NOT COME IN CONTACT WITH THE TRUNK BUT SHOULD BE 24 INCHES AWAY FROM THE TRUNK. h)
LOCATE AND EXPOSE ANY ROOTS 2 INCHES IN DIAMETER OR GREATER THAT MAY NEED TO BE PRUNED TO FACILITATE THE PROJECT. THIS INCLUDES ANY TRENCHING THAT WILL BE DONE AS PART OF FOUNDATIONOR UTILITY INSTALLATION. CONTACT THE CITY ARBORIST IN ADVANCE TO LESSEN THE AMOUNT OF TIME THATTHE ROOTS WILL BE EXPOSED. IF ROOTS MUST BE LEFT EXPOSED FOR MORE THAN THREE DAYS, CONSULT THECITY ARBORIST. NOTE:

THE 2 INCH DIAMETER THRESHOLD FOR ROOTS IS A GUIDELINE THAT MAY BE ADJUSTED BY THE CITY ARBORIST DEPENDING ON THE SIZE AND CONDITION OF THE TREE, AND THE LOCATIONOF THE ROOTS. THE CITY ARBORIST MAY INCREASE THE TPZ, OR IMPOSE OTHER RESTRICTIONS, WHEN THEDRIPLINE OF A TREE HAS BEEN ALTERED BY PRUNING OR UNUSUAL GROWTH PATTERNS. ANY ROOT PRUNING THAT WILL OCCUR WITHIN THE PARKWAY:

ALL WORK IN THE AREA WILL REQUIRE PRIOR
APPROVAL AND SHALL BE SUPERVISED BY THE PROJECT ARBORIST. ROOTS SHOULD BE CUTWITH A SAW TO PROVIDE A FLAT AND SMOOTH CUT. REMOVAL OF ROOTS LARGER THAN 2 INCHESIN DIAMETER SHOULD BE AVOIDED. i)

NO STORAGE OF BUILDING MATERIALS, REFUSE, EXCAVATED SPOILS, OR DUMPING OF POISONOUS MATERIALS, IS PERMITTED WITHIN THE DRIP LINE OF ANY PROTECTED TREE. POISONOUS MATERIALS INCLUDE,BUT ARE NOT LIMITED TO, PAINT, PETROLEUM PRODUCTS, CONCRETE OR STUCCO MIX, DIRTY WATER, OR ANYOTHER MATERIAL WHICH MAY BE DELETERIOUS TO TREE HEALTH.STREET TREE PLANTING NOTES:

1. FOR NEW PLANTING:
a.

THE CITY ARBORIST SHALL BE NOTIFIED, BY CALLING (510) 981-6660, PRIOR TO THE DELIVERY OF THETREES FOR INSPECTION OF THEIR SIZE AND STRUCTURE. b.

EACH TREE SHALL BE PROPERLY PLANTED AT OR JUST BELOW GRADE (<1").

SOIL AMENDMENT IS NOT
RECOMMENDED. NO CONSTRUCTION RUBBLE OR NON-ORGANIC MATERIAL SHALL BE WITHIN THE TREEWELL. NATIVE SOIL IS PREFERRED. c.

THE SURROUNDING SOIL OUTSIDE THE CONTAINER (ROOT BALL) SHOULD BE LIGHTLY COMPACTEDTO ABOUT 4 INCHES BELOW GRADE WITH THE ROOT BALL HIGHER THAN THAT. d.
2 TO 2.5 INCHES OF BASE ROCK SHOULD BE APPLIED AROUND THE ROOT BALL LEAVING 1.5 TO 2INCHES LEFT FOR THE MATERIAL. e.
15G CONTAINERS ARE APPROXIMATELY 15-16 INCHES IN DIAMETER AND THE MATERIAL SHOULD BEAPPLIED TO THE APPROXIMATE EDGE OF THE ROOT BALL WITH THE TOP GRADE OF THE ROOT BALLUP TO 1 INCH BELOW THE TOP OF THE MATERIAL THAT WILL BE APPLIED. f.

EACH NEW TREE SHALL HAVE AUTOMATIC DRIP IRRIGATION (NETAFIM PREFERRED) AND PROVIDE AMINIMUM OF 20 GALLONS PER WEEK BETWEEN MARCH 15 AND OCTOBER 15 FOR THE FIRST THREEYEARS. LARGER TREES MAY REQUIRE ADDITIONAL

BUBBLERS
DRIP LINES AND/OR EMITTERS. BUBBLERS
DRIP EMITTERS SHOULD BE LOCATED ON TOP OF THE ROOT BALL WITHIN THIS 15-16 INCH CIRCLEAND NOT BE COVERED WITH MATERIAL.

WHERE POSSIBLE, DRIP LINES AND EMITTERS ARE TO BE
INSTALLED IN CONCENTRIC CIRCLES, STARTING 24" AWAY FROM THE TRUNK, SPACED AT 18"APART, COVERING THE ENTIRE TREE WELL. g.

EACH EXISTING TREE TO REMAIN SHALL HAVE AUTOMATIC

DRIP IRRIGATION (NETAFIM PREFERRED)
AND PROVIDE A MINIMUM OF 20 GALLONS PER WEEK BETWEEN MARCH 15 AND OCTOBER 15 FOR THEFIRST THREE YEARS AFTER IT WAS PLANTED (PLANTING DATES AVAILABLE AT "CITY TREES" FROM CITYOF BERKELEY OPEN DATA, https://data.cityofberkeley.info/Natural-Resources/ City-Trees/9t35-jmin.)LARGER TREES MAY REQUIRE ADDITIONAL DRIP LINES AND/OR EMITTERS.

DRIP EMITTERS SHOULD
BE LOCATED AS FAR FROM THE TRUNKS OF MATURE TREES AS POSSIBLE. WHERE POSSIBLE, DRIP LINES AND EMITTERS ARE TO BE INSTALLED IN CONCENTRIC CIRCLES, STARTING 24" AWAYFROM THE TRUNK, SPACED AT 18" APART, COVERING THE ENTIRE TREE WELL. h.

TREES THAT DIE WITHIN THE FIRST THREE YEARS MUST BE REPLACED AT THE PROPERTY OWNER'S EXPENSE.

FIGURE 1 — TREE TRUNK PROTECTION EXAMPLESFIGURE 2 — TREE PROTECTION FENCE EXAMPLE FIGURE 4 — FLEXI-PAVE EXAMPLE (via City of Berkeley)(via City of Berkeley) (via City of Berkeley - SEE DETAIL TP2 FOR NOTES) NOTE: As of 9.11.24, no construction activities are approved within the tree wells of any existing trees to remain. See Figures 2 and 3 for examples of acceptable tree protection. All TPF to protect entire exposed soil area within each tree well.

TP2
FIGURE 3 — TREE

PROTECTION FENCE

EXAMPLE

Page 94 of 432 ends