Implementation P16: Use, as appropriate, the “Guidelines for Noise Compatible Land Use” (Table 5, Guidelines for Noise Compatible Land Use), or other measures that are acceptable to the city, to guide land use and zoning reclassification, subdivision, conditional use and use variance determinations and environmental assessment considerations, especially relative to sensitive uses, as defined by this chapter, within a CNEL of 65 dB airport noise exposure areas and within a line-of-sight of freeways, major highways, railroads or truck haul routes.
Table 5
Guidelines for Noise Compatible Land Use
Land Use Category Day-Night Average Exterior Sound Level (Ldn or CNEL, dBA) 50 55 60 65 70 75 80
Residential – Single-Family, Duplex, Mobile Homes A C C C N U U Residential – Multiple Family A A C C N U U
Transient Lodging, Motel, Hotels A A C C N U U
School, Library, Church, Hospital, Nursing Home A A C C N N U Auditorium, Concert Hall, Amphitheater C C C C/N U U U
Sports Arena, Outdoor Spectator Sports C C C C C/U U U
Playground, Neighborhood Park A A A A/N N N/U U
Golf Course, Riding Stable, Water Recreation, Cemetery A A A A N A/N U Office Building, Business Commercial and Professional A A A A/C C C/N N Industrial, Manufacturing, Utilities, Agriculture A A A A A/C C/N N Notes: Ldn: average day/night sound level; CNEL: Community Noise Equivalent Level; dBA = A-weighted decibel A = Normally acceptable – Specified land use is satisfactory, based upon the assumption that any buildings involved are of normal conventional construction, without any special noise insulation requirements.
C = Conditionally Acceptable – New construction or development should be undertaken only after a detailed analysis of the noise reduction requirements is made and needed noise insulation features included in the design. Conventional construction, but with closed windows and fresh air supply systems or air conditioning will normally suffice.
N = Normally Unacceptable – New construction or development should be discouraged. If new construction or development does proceed, a detailed analysis of the noise reduction requirements must be made and needed noise insulation features included in the design.
U = Clearly Unacceptable – New construction or development should generally not be undertaken.
Source: City of Los Angeles, General Plan Noise Element, Exhibit 1: Guidelines for Noise Compatible Land Use, 1999.
City of Los Angeles Municipal Code
Chapter XI of the Los Angeles Municipal Code (Los Angeles Municipal Code) contains noise control regulations.
Los Angeles Municipal Code Section 111.02, Sound Level Measurement Procedure and Criteria, provides procedures and criteria for the measurement of the sound level of “offending” noise sources. According to the Los Angeles Municipal Code, a noise level increase of 5 dBA over the existing average ambient noise level at an adjacent property line is considered a noise violation.
Los Angeles Municipal Code Section 112.03, Construction Noise, regulated noise due to construction or repair work as provided by Section 41.40, Noise due to Construction, Excavation Work – When Prohibited, Oakhurst Apartments Project
Noise and Vibration Assessment 16
of the Los Angeles Municipal Code. No person shall, between the hours of 9:00 p.m. and 7:00 a.m. of the following day, perform any construction or repair work of any kind upon, or any excavating for, any building or structure, where any of the foregoing entails the use of any power driven drill, riveting machine excavator or any other machine, tool, device or equipment which makes loud noises to the disturbance of persons occupying sleeping quarters in any dwelling hotel or apartment or other place of residence. In addition, the operation, repair or servicing of construction equipment and the job-site delivering of construction materials in such areas shall be prohibited during the hours herein specified. Any person who knowingly and willfully violates the foregoing provision shall be deemed guilty of a misdemeanor punishable as elsewhere provided in this Code.
Los Angeles Municipal Code Section 112.05, Maximum Noise Level of Powered Equipment or Powered Hand Tools, states that construction and industrial machinery shall not exceed a maximum of 75 dBA at a distance of 50 feet in a residential zone or within 500 feet of a residential zone, except where compliance is technically infeasible. Technical infeasibility shall mean that said noise limitations cannot be complied with despite the use of mufflers, shields, sound barriers and/or other noise reduction device ortechniques during the operation of the equipment.
CALIFORNIA ENVIRONMENTAL QUALITY ACT THRESHOLDS
The environmental analysis in this memorandum is patterned after the Initial Study Checklist recommended by the CEQA Guidelines. The issues presented in the Initial Study Checklist have been utilized as thresholds of significance in this section. Accordingly, a project may have a significant adverse impact related to noise and vibration if it would do any of the following:
• Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies (refer to Impact Statement NOI-1); • Generation of excessive groundborne vibration or groundborne noise levels (refer to Impact Statement NOI-2); and/or
• For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels (refer to Impact Statement NOI-3).
METHODOLOGY AND THRESHOLDS OF SIGNIFICANCE
Methodology
Noise levels from construction equipment and activities were modeled using the Federal Highway Administration’s Roadway Construction Noise Model (RCNM); refer to Appendix A for results of the RCNM modeling. Project construction equipment are based on the Oakhurst Apartment Project Air Quality Assessment prepared by Michael Baker International, dated September 2024.
Oakhurst Apartments Project
Noise and Vibration Assessment 17
Thresholds of Significance
City of Beverly Hills
Construction Noise
Based on the discussion with the City of Beverly Hills6 , construction noise would be significant if 1)
construction activities occurring on the project site generate a noise increase of five dBA or more outside the hours permitted by the City of Beverly Hill’s noise ordinance at the project site (i.e., between 6:00 p.m. and 8:00 a.m. on weekdays, or at any time on Saturday, Sunday, or a public holiday), or 2) construction activities occurring on a project site generate a noise increase of five dBA or more during daytime hours at uses identified in Section 5-1-206 of the City of Beverly Hills’ Noise Ordinance, which include schools, hospitals, churches, or institutes of learning.
Operational Noise
According to the City of Beverly Hills’ Noise Ordinance, it is unlawful for any stationary source such as mechanical equipment (air condition and heating units) to increase the ambient noise levels at the property line by 5 dBA. However, the City of Beverly Hills does not have a threshold of significance for other operational noise sources (traffic noise, parking lot noise, crowd noise, etc.). As a conservative analysis, these operational noise sources would utilize the threshold of significance used for stationary sources. As such, a significance increase in noise level would occur if operational noise sources would increase the ambient noise levels by 5 dBA.
City of Los Angeles
Construction Noise
According to Los Angeles Municipal Code Section 112.03, Construction Noise, construction-related noise levels are governed by Section 41.40, Noise due to Construction, Excavation Work – When Prohibited.
According to Los Angeles Municipal Code Section 41.40, construction would be required to occur between the hours of 9:00 p.m. and 7:00 a.m. of the following day. Additionally, pursuant of Los Angeles Municipal Code Section 112.05, Maximum Noise Level of Powered Equipment or Powered Hand Tools, construction and industrial equipment should not exceed a maximum of 75 dBA at a distance of 50 feet in a residential zone or within 500 feet of a residential zone, except where compliance is technically infeasible.
Operational Noise
Los Angeles Municipal Code, Section 111.02, Sound Level Measurement Procedure and Criteria, provides procedures and criteria for the measurement of the sound level of “offending” noise sources. According to the Los Angeles Municipal Code, a noise level increase of 5 dBA over the existing average ambient noise level at an adjacent property line is considered a noise violation. As such, a significance increase in noise level would occur if operational noise sources would increase the ambient noise levels by 5 dBA. 6 9229 Wilshire Boulevard – Class 32 Report Discussion, on January 5, 2024.
Oakhurst Apartments Project
Noise and Vibration Assessment 18
IMPACT ANALYSIS
NOI-1 Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
Less Than Significant Impact. As the project site is located within the jurisdiction of both the City of Beverly Hills and the City of Los Angeles, the analysis below would compare the project’s noise impact to the City of Beverly Hills and City of Los Angeles noise thresholds. Both the City of Beverly Hills and City of Los Angeles Noise Elements establishes guidelines for controlling construction and operational noise within their jurisdiction.
Construction Noise Impacts
Ground-borne noise and other types of construction-related noise impacts typically occur during the initial demolition and grading phases, which has the potential to create the highest levels of noise. Construction equipment produce maximum noise levels when equipment is operating under full power conditions (i.e., the equipment engine at maximum speed). However, equipment used on construction sites typically operates under less than full power conditions, or part power. To more accurately characterize construction-period noise levels, the average (Leq) noise level associated with each construction stage is calculated based on the quantity, type, and usage factors for each type of equipment that would be used during each construction stage. These noise levels are typically associated with multiple pieces of equipment simultaneously operating on part power.
Los Angeles Municipal Code Section 112.05 prohibits the use of construction and industrial equipment if the maximum noise levels exceed 75 dBA at 50 feet within a residential zone. Additionally, it should be noted that a portion of the project site is within the jurisdiction of the City of Beverly Hills. As stated above, construction noise in the City of Beverly Hills would be significant if 1) construction activities occurring on the project site generate a noise increase of five dBA or more outside the hours permitted by the City of Beverly Hill’s noise ordinance at the project site (i.e., between 6:00 p.m. and 8:00 a.m. on weekdays, or at any time on Saturday, Sunday, or a public holiday), or 2) construction activities occurring on a project site generate a noise increase of five dBA or more during daytime hours at uses identified in Section 5-1- 206 of the City of Beverly Hills’ Noise Ordinance, which include schools, hospitals, churches, or institutes of learning. For the purposes of this analysis, a construction noise impact would occur at the multi-family residential uses if construction noise generated from mobile construction equipment exceeds 75 dBA at 50 feet pursuant of the Los Angeles Municipal Code. Additionally, a significant impact would occur if construction occurring outside the permitted hours result in a 5 dBA increase or if construction would result in a 5 dBA increase at schools, hospitals, churches, or institutes of learning pursuant of the City of Beverly Hills noise ordinance.
The estimated construction noise levels at the nearest noise-sensitive receptors are presented in Table 6, Construction Noise Levels at the Nearest Residential Receptors. Noise levels from construction equipment and activities were modeled using the Federal Highway Administration’s RCNM. To present a conservative impact analysis, the estimated noise levels were calculated for a scenario in which all heavy construction equipment were assumed to operate simultaneously.
The nearest sensitive uses (multi-family residential uses) are located approximately 15 feet from the project site to the north and south. However, construction activities would occur throughout the project Oakhurst Apartments Project
Noise and Vibration Assessment 19
site, and it should also be noted that construction noise levels would intermittently occur for a few days when construction equipment is operating closest to the nearest sensitive uses. The remainder of the time, the construction noise levels would be much lower because the equipment would be working in an area farther away from the existing sensitive uses. The General Noise Assessment methodology prescribed in the FTA Transit Noise and Vibration Impact Assessment Manual, recommends evaluating construction noise from the center of the site, stating under the variable distance in its construction noise calculation to “assume that all equipment operates at the center of the project.” As such, the construction noise levels shown in Table 6 are estimated using the distance from the center of the project site to the property line of the existing sensitive receptors, which is approximately 45 feet from the closest sensitive receptor to the north and south.
Table 6
Construction Noise Levels at the Nearest Residential Receptors Phase Estimated Exterior Construction Noise Level at 45 feet (Center of the Site to Residential Uses to the North and South) (dBA Leq)1
Demolition 87.8
Grading 85.5
Building Construction 88.5
Architectural Coating 74.6
Notes:
1. These noise levels conservatively assume the simultaneous operation of all heavy construction equipment at the same precise location.
Modeled heavy construction equipment include tractors, dozer, concrete saw, and excavator during the demolition phase, grader, dozer, and tractors during the grading phase, crane, forklift, generator, tractor, air compressor, generator, welders, concrete saw, and cement mixer during the building construction phase, and air compressor during the architectural coating phase.
Source: Federal Highway Administration, Roadway Construction Noise Model (RCNM), 2006 (see Appendix A).
As shown in Table 6, construction-generated noise levels would range from 74.6 dBA Leq to 88.5 dBA Leq at the nearest sensitive receptor (multi-family residences) property boundary located approximately 45 feet to the north and south from the geographic center of the project site. Additionally, it should be noted that modeling of construction noise levels in Table 6 assumes that construction equipment would operate simultaneously and represents a worse-case scenario. According to the Los Angeles Municipal Code Section 112.05, construction and industrial equipment should not exceed a maximum noise level of 75 dBA at 50 feet in a residential zone or within 500 feet of a residential zone, except where compliance is technically infeasible. As shown in Table 6, noise levels during each phase (except for architectural coating) would have an average construction noise level that exceeds the 75 dBA threshold. As part of the proposed project, a Construction Noise Management Plan (CNMP) would be implemented to reduce overall construction noise levels; refer to Appendix B, Construction Noise Management Plan. According to the CNMP, the project would use construction equipment with properly operating and maintained mufflers, locate stationary construction equipment so that emitted noise is directed away from the nearest noise sensitive receptors, and limit construction hours to be consistent with the Los Angeles Municipal Code and Beverly Hills Noise Ordinance. The required features in the CNMP would reduce noise levels by approximately 5 dBA, resulting in construction-generated noise levels ranging from 69.4 to 83.5 dBA Leq. It should be noted that the implementation of a noise barrier would further reduce construction noise levels; however, this feature was considered and determined to be infeasible as the project is surrounded by multi-story buildings, which would require noise barriers as tall as three stories to block the line-of-sight. As such, with the required features outlined in the CNMP, the project would implement all technically feasible measures to reduce construction noise levels, and therefore would comply with the Los Angeles Municipal Code requirements.
Oakhurst Apartments Project
Noise and Vibration Assessment 20
According to the Los Angeles Municipal Code Section 41.40, construction would be prohibited between the hours of 9:00 p.m. and 7:00 a.m. of the following day. Pursuant of the Beverly Hills Noise Ordinance, construction would be prohibited between the hours of 6:00 p.m. and 8:00 a.m. on any day and construction shall not occur on Sunday or a public holiday. As such, to comply with both the Los Angeles Municipal Code and the Beverly Hills Noise Ordinance, noise generated from project construction activities would only occur during the hours of 8:00 a.m. and 6:00 p.m. on weekdays and would not occur on a Sunday or public holiday. Additionally, because the project site is located within a residential zone, project construction would not occur on Saturday pursuant of the Beverly Hills Noise Ordinance. It should be noted that construction activities would be exempt from the Beverly Hills noise standards per Noise Ordinance Section 5-1-205 within the permitted construction hours in recognition that construction activities undertaken during daytime hours are a typical part of living in an urban environment and do not cause a significant disruption.
Furthermore, the project site is not located near any school, hospital, or institute of learning and daytime construction activities at the project site would not result in a significant impact at these receptors. The nearest school (Hawthorne Elementary School) is located approximately 0.75 mile to the west of the project site and the nearest hospital use (Cedars Sinai Medical Center) is approximately 0.5 miles to the east. Therefore, on-site construction noise would attenuate over long distances such that construction activities would not be audible at these receptors.
It should be noted that the nearest religious use (Young Israel of North, within the City of Beverly Hills) is located approximately 1,150 feet to the west (0.20 miles). The estimated construction noise levels at the nearest religious use receptors are presented in Table 7, Construction Noise Levels at the Nearest Religious Receptor.
Table 7
Construction Noise Levels at the Nearest Religious Receptors Phase Estimated Exterior Construction Noise Level at 1,150 feet (Center of the Site to Religious Uses to the West) (dBA Leq)1
Demolition 59.7
Grading 57.3
Building Construction 60.3
Architectural Coating 46.5
Notes:
2. These noise levels conservatively assume the simultaneous operation of all heavy construction equipment at the same precise location.
Modeled heavy construction equipment include tractors, dozer, concrete saw, and excavator during the demolition phase, grader, dozer, and tractors during the grading phase, crane, forklift, generator, tractor, air compressor, generator, welders, concrete saw, and cement mixer during the building construction phase, and air compressor during the architectural coating phase.
Source: Federal Highway Administration, Roadway Construction Noise Model (RCNM), 2006 (see Appendix A).
As indicated in Table 7, construction of the proposed project would result in noise levels ranging from
46.5 to 60.3 dBA Leq at the nearest religious use. A short-term noise measurement was conducted near the closest religious use and indicates that the existing ambient noise level is approximately 63.1 dBA; refer to Table 3. As such, construction of the proposed project would not result in a 5 dBA increase over the existing ambient noise levels as identified in Section 5-1-206 of the Beverly Hills Noise Ordinance.
Thus, less than significant noise impacts from construction activities would result.
Oakhurst Apartments Project
Noise and Vibration Assessment 21
Construction Trips Noise Impacts
Construction activities would also cause increased noise along access routes along the Beverly Boulevard, Alden Drive, and Oakhurst Drive due to movement of equipment and workers, as well as haul trips.
According to the California Department of Transportation (Caltrans), a doubling of traffic (100 percent increase) on a roadway would result in a perceptible increase in traffic noise levels (3 dBA).7 As such, a significant impact would occur if construction-related trips double existing traffic volumes.
According to the Air Quality Assessment, it is anticipated that project construction would generate a maximum of 18 hauling trips per day, 100 worker trips per day, and 22 vendor trips per day. The existing ADT along Beverly Boulevard is 14,100 for eastbound traffic and 16,500 for westbound traffic. 8 Per 24-
hour traffic counts conducted in 1999 as part of the City of Beverly Hills General Plan EIR, Oakhurst Drive experiences approximately 2,397 average daily trips (ADT).9 While this data is outdated, the 24-hour traffic volume counts from 1999 is used as a conservative analysis as current traffic volumes are significantly higher than 1999. Specifically, the City of Beverly Hills Technical Noise Supplement to the Traffic Noise Analysis Protocol utilizes a growth factor of 0.8433 percent per year when factoring traffic volumes up to 2005 where applicable. As such, it would be appropriate to assume that traffic volumes factored to the year 2024 would be greater than 2,397 ADT. Nevertheless, as a conservative analysis, the lower 2,397 ADT along Oakhurst Drive from 1999 is utilized. Based on the Cedars-Sinai Medical Center West Tower Project, Appendix E, Traffic Impact Study, Alden Drive between Swall Drive and Clark Drive experiences approximately 3,468 ADT.
10 While this roadway segment is not directly located within the proximity of the proposed project, it would be appropriate to assume that ADT along this roadway would be similar. The combined total of project-related construction trips (140 trips) would not result in a doubling of existing traffic volumes along Oakhurst Drive or Alden Drive. Similarly, construction trips from the proposed project would not double existing traffic volumes for eastbound and westbound traffic along Beverly Boulevard. As the construction-related trips would not double existing traffic volumes, there would not be a perceptible increase (3 dBA) in traffic noise. Additionally, mobile traffic noise from construction trips would be temporary and would cease upon project completion. Thus, impacts in this regard would be less than significant.
Long-Term Operational Noise Impacts
Off-Site Mobile Noise
Future development generated by the proposed project would result in some additional traffic on adjacent roadways, thereby potentially increasing vehicular noise in the vicinity of existing and proposed land uses. The most prominent source of mobile traffic noise in the project vicinity is along Beverly Boulevard, Alden Drive, and Oakhurst Drive. The proposed development would also include a private alleyway located directly east of the project site.
7 California Department of Transportation, Technical Noise Supplement to the Traffic Noise Analysis Protocol, September 2013. 8 City of Beverly Hills Traffic Engineering, Traffic Flow Data, https://www.beverlyhills.org/950/Traffic-Engineering, accessed July 11, 2024. 9 City of Beverly Hills, General Plan Technical Background Report, Appendices, https://www.beverlyhills.org/DocumentCenter/View/5516/General-Plan-Technical-Background-Report---Appendices-PDF, accessed August 6, 2024. 10 City of Los Angeles, Cedars-Sinai Medical Center West Tower Project, Appendix E, Traffic Impact Study https://planning.lacity.gov/eir/CedarSinia/FEIR/Appendices/Appendix%20E%20%E2%80%93Traffic%20Impact%20Study.pdf, accessed September 26, 2024.
Oakhurst Apartments Project
Noise and Vibration Assessment 22
According to the Air Quality Assessment, the project would generate approximately 283 ADT on weekdays, 255 ADT on Saturday, and 213 ADT on Sunday based on the proposed land use types. As a conservative analysis, the largest number of trips (283 ADT) would be compared to existing traffic volumes. It should be noted that traffic from existing uses on site was not considered, which results in a more conservative analysis. According to the California Department of Transportation (Caltrans), a doubling of traffic (100 percent increase) on a roadway would result in a perceptible increase in traffic noise levels (3 dBA).
As discussed above, the existing ADT along Beverly Boulevard is 14,100 for eastbound traffic and 16,500 for westbound traffic.
11 24-hour traffic counts conducted in 1999 states that Oakhurst Drive experienced around 2,397 ADT. Alden Drive experiences traffic volumes of approximately 3,468. 12 As such, the
project’s 283 ADT would not double existing traffic volumes along Beverly Boulevard (14,100 ADT for eastbound traffic and 16,500 ADT for westbound traffic), Oakhurst Drive (2,397 ADT), and Alden Drive (3,468 ADT). Thus, the project would not result in a perceptible increase traffic noise level (3 dBA) as the project’s operational trip would not double existing traffic volumes. As such, a less than significant impacts would occur in this regard.
It should be noted that the project would use the alleyway for vehicular ingress and egress to the underground parking lot. The alleyway is already used under the existing conditions by surrounding residential development for vehicular movement into parking stalls or underground parking lots.
Additionally, as previously discussed above, the estimated daily trips from the proposed project would represent a nominal increase in daily traffic compared to existing traffic conditions along Beverly Boulevard and Alden Drive which connect to the private alleyway. Thus, a less than significant impact would occur.
Stationary Noise
Stationary noise sources associated with the project would include the operation of mechanical equipment and outdoor gathering areas.
Mechanical Equipment Noise
Heating, ventilation, and air conditioning (HVAC) units would be installed on the roof of the proposed building. Typically, mechanical equipment noise is approximately 66 dBA at 3 feet from the source.13 Based upon the Inverse Square Law, sound levels decrease by 6 dBA for each doubling of distance from the source.14 The mechanical equipment (HVAC units) would be located within a screened mechanical zone located along the northwestern portion of the roof of the proposed structure. The nearest sensitive receptor to the project site is the multi-family residence located approximately 24 feet to the north of the proposed mechanical units (15 feet from the project boundary plus 9 feet setback). At this distance, the noise levels from a single HVAC unit would be approximately 48 dBA at the nearest sensitive receptor. 11 City of Beverly Hills Traffic Engineering, Traffic Flow Data, https://www.beverlyhills.org/950/Traffic-Engineering, accessed July 11, 2024. 12 City of Los Angeles, Cedars-Sinai Medical Center West Tower Project, Appendix E, Traffic Impact Study https://planning.lacity.gov/eir/CedarSinia/FEIR/Appendices/Appendix%20E%20%E2%80%93Traffic%20Impact%20Study.pdf, accessed September 26, 2024. 13 Elliott H. Berger, Rick Neitzel, and Cynthia A. Kladden, Noise Navigator Sound Level Database with Over 1700 Measurement Values, June 26, 2015. 14 Cyril M. Harris, Noise Control in Buildings, 1994.
Oakhurst Apartments Project
Noise and Vibration Assessment 23
This analysis assumes approximately 15 five-ton HVAC units (one single five-ton HVAC unit for every 2,500 square feet), which would generate a combined noise level of approximately 60 dBA when operating simultaneously.15 However, the proposed HVAC units would be shielded by a parapet wall, which would completely shield the HVAC units and break the line-of-sight between the HVAC units and the sensitive receptors to the north. As such, the parapet wall would further attenuate operational noise from the HVAC units by approximately 8 dBA.
16 As such, noise levels from the proposed HVAC units would be approximately 52 dBA and would not increase noise levels by more than 5 dBA over ambient daytime and nighttime noise levels (refer to Table 2, 67.0 LDay and 49.6 dBA LNight). Furthermore, HVAC units currently exist on-site and would not represent a new noise source.
Therefore, the proposed HVAC units would not generate noise levels in excess of 5 dBA over existing ambient daytime and nighttime noise level in the project vicinity in compliance with Section 5-1-202 of the Beverly Hills Noise Ordinance and Section 111.02 of the Los Angeles Municipal Code. Thus, the proposed project would not result in significant noise impacts from HVAC units to the nearest sensitive receptor, and stationary noise levels from the proposed HVAC units would comply with the Beverly Hills Noise Ordinance and Los Angeles Municipal Code. Impacts in this regard would be less than significant.
Outdoor Gathering Area Noise
The project would include an open-air courtyard located centrally on the project site. The open-air courtyard is located centrally on the second floor and would be surrounded on all sides by the proposed building. The courtyard has the potential to be accessed by groups of people intermittently for various occasions (e.g., events, other social gatherings, etc.). Noise generated by groups of people (i.e., crowds) is dependent on several factors including vocal effort, impulsiveness, and the random orientation of the crowd members. Crowd noise is estimated at 60 dBA at one meter (3.28 feet) away for raised normal speaking.17 This noise level would have a +5 dBA adjustment for the impulsiveness of the noise source, and a -3 dBA adjustment for the random orientation of the crowd members.18 Therefore, crowd noise would be approximately 62 dBA at one meter from the source (i.e., open-air courtyard).
At approximately 45 feet (center of the project site to the nearest receptor), crowd noise levels would be approximately 37 dBA. As such, crowd noise from the proposed project would not increase noise levels more than 5 dBA over ambient daytime and nighttime noise levels (refer to Table 2, 67.0 LDay and 49.6 dBA LNight). As such, noise from crowds gathering at the open-air courtyard would not be audible to the nearby sensitive receptors.
According to the Supreme Court of California ruling in the Make UC a Good Neighbor v. the Regents of the University of California, it was determined that “social noise” (noise created by humans) was not an environmental impact required by CEQA to be analyzed for residential projects. As such, Assembly Bill 1307 was signed into law in September 2023. Assembly Bill 1307 added Public Resources Code Section 21085 which states “For the purposes of this division, for residential projects, the effects of noise generated by the project occupants and their guest on human beings is not a significant effect on the environment”. As such, the analysis shown above was only included for informational purposes. Impacts would be less than significant.
15 American Standard Heating and Air Conditioning, What Size AC Unit do I Need, https://www.americanstandardair.com/resources/blog/what-size-ac-unit-do-i-need/, accessed August 7, 2024. 16 Federal Highway Administration, Roadway Construction Noise Model User’s Guide, January 2016. 17 M.J. Hayne, et al, Prediction of Crowd Noise, Acoustics, November 2006. 18 Ibid.
Oakhurst Apartments Project
Noise and Vibration Assessment 24
Cumulative Operational
Off-Site Mobile Noise
As discussed above, the project’s potential traffic redistribution noise levels would not exceed the established significance criteria (i.e., 3.0 dB increase and exceedance of 65 dBA CNEL). As discussed above, the proposed project would not double existing traffic volumes along surrounding roadways and was determined to have a less than significant impact. The closest related project is the 401 North Oakhurst Drive which would remodel the existing six-unit residential building for the construction a taller multifamily residential development with more dwelling units. The 401 North Oakhurst Drive currently on file would construct a total of 25 dwelling units. As the proposed project would construct a total of 52 units, it can be assumed that the 401 North Oakhurst Drive would result in a traffic generation ranging from 107 to 142 ADT (approximately half of the proposed project). Even with the addition of 401 North Oakhurst Drive’s projected ADT to the proposed project’s traffic generation, the combined total would not double existing traffic volumes along Oakhurst Drive, Alden Drive, and Beverly Boulevard. Therefore, the proposed project, in combination with cumulative traffic noise levels, would result in less than significant impacts.
Stationary Noise
Although the proposed multi-family residential building may occur in proximity to other future developments, the proposed development would not involve stationary noise sourcesthat are capable to produce substantial noise above existing ambient noise levels and was determined to result in a less than significant impact. Stationary noise sources associated with the project would include the operation of mechanical equipment (heating, ventilation, and air conditioning) and outdoor gathering areas, all of which are typical noise sources that are currently present in any urban setting. Additionally, as noise dissipates as it travels away from its source, noise impacts from stationary sources would be limited to each of the respective sites and their vicinities. As discussed above, the closest related project is the 401 North Oakhurst Drive. It should be noted that the 401 North Oakhurst Drive currently on file proposes a 11-story tall structure. As such, HVAC units of the related project would be located further above the existing surrounding buildings, which would help minimize noise. Nevertheless, the 401 North Oakhurst Drive would be subjected to BHMC Section 5-1-202, requiring HVAC units’ noise not to exceed 5 dBA over existing ambient noise level. Thus, compliance with BHMC Section 5-1-202 would ensure that the project and any cumulative development in the project vicinity would not be anticipated to result in a significant cumulative impact. A less than significant impact would occur in this regard.
Mitigation Measures: No mitigation is required.
NOI-2 Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels?
Short-Term Construction Vibration Impacts
Project construction can generate varying degrees of groundborne vibration, depending on the construction procedure and the construction equipment used. Operation of construction equipment generates vibrations that spread through the ground and diminish in amplitude with distance from the source. The effect on buildings located in the vicinity of the construction site often varies depending on Oakhurst Apartments Project
Noise and Vibration Assessment 25
soil type, ground strata, and construction characteristics of the receiver building(s). The results from vibration can range from no perceptible effects at the lowest vibration levels, to low rumbling sounds and perceptible vibration at moderate levels, to slight damage at the highest levels. Groundborne vibrations from construction activities rarely reach levels that damage structures.
The Caltrans Transportation and Construction Vibration Manual identifies various vibration damage criteria for different building classes. This evaluation uses the Caltrans architectural damage criterion for continuous vibrations at historic and some old buildings of 0.25 inch-per-second (inch/second) PPV. The nearest structure to the project site is 416 North Oakhurst Drive to the north. This structure was built in 1965 and may be eligible to be listed in the California Register due to the structure being more than 50 years old. While a historical resources survey has not been prepared for 416 North Oakhurst Drive, as a conservative analysis, the threshold of 0.25 inch/second PPV would be used. The types of construction vibration impacts include human annoyance and building damage. Human annoyance is assessed based on levels of perception, with a PPV of 0.08 inch/second being considered “readily perceptible,” 0.1 inch/second being perceptible and may begin to annoy receptors, 0.2 inch/second being perceptible and may annoy people within buildings, and 0.4 to 0.6 inch/second as “unpleasant”; refer to Table 1. Human annoyance occurs when construction vibration rises significantly above the threshold of human perception for extended periods of time. Construction of the proposed project would occur over approximately 32 months and would include demolition, grading, building construction, and architectural coatings. Typical vibration produced by construction equipment is illustrated in Table 8, Typical Vibration Levels for Construction Equipment.
Table 8
Typical Vibration Levels for Construction Equipment
Equipment Approximate peak particle velocity at 25 feet (inch/sec)
Approximate peak particle velocity at 15 feet
(inch/sec)1
Large bulldozer 0.089 0.1915
Loaded trucks 0.076 0.1635
Small bulldozer 0.003 0.0065
Notes:
1. Calculated using the following formula:
PPV equip = PPV ref x (25/D)1.1
where: PPV equip = the peak particle velocity in in/sec of the equipment adjusted for the distance PPV ref = the reference vibration level in in/sec from Table 7-4 of the FTA Transit Noise and Vibration Impact Assessment Guidelines
D = the distance from the equipment to the receiver
Source: California Department of Transportation, Transportation and Construction Vibration Guidance Manual, April 2020.
As indicated in Table 8, vibration velocities from typical heavy construction equipment operation would range from 0.003 to 0.089 inch/second PPV at 25 feet from the source of activity. The nearest structure to the project site occupied by sensitive receptors is the existing multi-family residential building (416 North Oakhurst Drive) located approximately 15 feet to the north when measured from the project site property line to the sensitive receptor’s building façade (approximately 15 feet setback). Vibration level during the operation of construction equipment would be approximately 0.0065 inch/second PPV to
0.1915 inch/second PPV at 15 feet; refer to Table 8. As a result, construction groundborne vibration would not be capable of exceeding the 0.25 inch/second PPV significance threshold for vibration to the historic buildings and other old buildings and a less than significant impact would occur in this regard.
It should be noted that the closest structure to the project site (416 North Oakhurst Drive) would not experience vibration velocities that exceed the 0.25 inch/second PPV significance threshold for vibration Oakhurst Apartments Project
Noise and Vibration Assessment 26
at historic buildings and other old buildings. Other potential historic buildings in the project vicinity are located further from the project site than 416 North Oakhurst Drive and therefore would be subject to lower vibration levels from construction of the project. As the threshold of 0.25 inch/second PPV for historic buildings would not be exceeded at the nearest structure, a less than significant impact would occur at other potential historic buildings nearby.
As indicated in Table 8, vibration velocities from heavy construction equipment operation would be below the 0.2 inch/second factor for human annoyance within buildings. As discussed above, 0.2 inch/second factor is the threshold in which receptors within buildings may begin to experience annoyance due to vibration velocities. However, it should be noted that vibration velocities would only occur when construction equipment are operational closer to the sensitive receptor and would diminish as they move away. Additionally, construction equipment would only be operational for short periods of time, further limiting the overall vibration velocities felt by nearby sensitive receptors. As such, equipment would not be operational at peak vibration velocities for extended periods of time and impacts would be less than significant in this regard.
Long-Term Operational Vibration Impacts
The project would involve construction of a multi-family residential building and would not generate groundborne vibration during its operation that could be felt by surrounding uses. The project operation would not involve railroads or substantial heavy truck operations, and therefore would not result in vibration impacts at surrounding uses. Thus, no impact would occur in this regard.
Mitigation Measures: No mitigation is required.
NOI-3 For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels??
No Impact. The nearest public use airport to the project site is the Santa Monica Municipal Airport which lies approximately 5.2 miles to the southwest of the project site. According to Exhibit 3-4, Year 2018 CNEL Contours Santa Monica Airport, of the City’s Calendar Year 2018 CNEL Contours Santa Monica Municipal Airport, the project site is not located within the Santa Monica Municipal Airport CNEL contours. 19 The
project site is not in the vicinity of a private airstrip. Therefore, no impact related to airport land use compatibility would occur.
Mitigation Measures: No mitigation is required.
19 Santa Monica Municipal Airport, 2018 CNEL Noise Contours, https://www.smgov.net/uploadedFiles/Departments/Airport/2018%20Annual%20Noise%20CNEL%20Report.pdf, accessed July 11, 2024.
Oakhurst Apartments Project
Noise and Vibration Assessment 27
REFERENCES
Documents
1. American Standard Heating and Air Conditioning, What Size AC Unit do I Need, https://www.americanstandardair.com/resources/blog/what-size-ac-unit-do-i-need/, accessed August 7, 2024.
2. California Department of Transportation, Technical Noise Supplement to the Traffic Noise Analysis Protocol, September 2013.
3. California Department of Transportation, Transportation Related Earthborne Vibrations, 2002.
4. City of Beverly Hills, City of Beverly Hills General Plan, Appendix B: Land Use Noise Compatibility Guidelines, January 2010.
5. City of Beverly Hills, General Plan Land Use Designations – City of Beverly Hills, https://www.beverlyhills.org/cbhfiles/storage/files/1807037749744115284/Landuse_11x17_20 220125.pdf, accessed July 8, 2024.
6. City of Beverly Hills, General Plan Technical Background Report, Appendices, https://www.beverlyhills.org/DocumentCenter/View/5516/General-Plan-Technical-BackgroundReport---Appendices-PDF, accessed August 6, 2024.
7. City of Beverly Hills Traffic Engineering, Traffic Flow Data, https://www.beverlyhills.org/950/Traffic-Engineering, accessed July 11, 2024.
8. City of Los Angeles, General Plan Land Use Map, Wilshire Community Map, https://planning.lacity.gov/odocument/2ec22248-3c1e-4354-b5d1- 096cdf9845ab/wilplanmap.pdf, accessed July 8, 2024.
9. City of Los Angeles, General Plan Noise Element, Exhibit 1: Guidelines for Noise Compatible Land Use, 1999.
10. Cyril M. Harris, Noise Control in Buildings, 1994.
11. Santa Monica Municipal Airport, 2016 CNEL Noise Contours, https://www.smgov.net/uploadedFiles/Departments/Airport/2018%20Annual%20Noise%20CNE L%20Report.pdf, accessed July 11, 2024.
12. Cyril M. Harris, Noise Control in Buildings, 1994.
13. Elliott H. Berger, Rick Neitzel, and Cynthia A. Kladden, Noise Navigator Sound Level Database with Over 1700 Measurement Values, June 26, 2015.
14. Federal Highway Administration, Roadway Construction Noise Model (FHWA-HEP-05-054), January 2006.
Oakhurst Apartments Project
Noise and Vibration Assessment 28
15. Federal Transit Administration, Transit Noise and Vibration Impact Assessment Manual, September 2018.
16. Michael Baker International, Oakhurst Apartment Project Air Quality Assessment, dated August 2024.
17. M.J. Hayne, et al, Prediction of Crowd Noise, Acoustics, November 2006.
Websites / Programs
1. Google Earth, 2022.
2. Roadway Construction Noise Model (Version 1.1), 2008.
Appendix A
Noise Data
Site Number: NM-1
Recorded By: Tina Yuan, Darshan Shivaiah
Job Number: 199941
Date: 7/9/2024
Time: 11:49 A.M.
Location: In front of 411 North Oakhurst Drive
Source of Ambient Noise: Traffic along Oakhurst Drive
Noise Data
Leq (dB) Lmax(dB) Lmin (dB)
54.6 70.2 44.0
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 06/04/2023
Microphone Brüel & Kjær 4189 3086765 06/04/2023
Preamp Brüel & Kjær ZC 0032 25380 06/04/2023
Calibrator Brüel & Kjær 4231 2545667 06/04/2023
Weather Data
Est.
Duration: 10 minutes Sky: Clear, Sunny
Note: dBA Offset = -0.04 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 4 mph 78 29.82
Photo of Measurement Location
I
I
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 07/09/2024 11:49:37
End Time: 07/09/2024 11:59:37
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.19
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 07/09/2024 10:46:04
Calibration Type: External reference
Sensitivity: 43.2623401284218 mV/Pa
OAK_003
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 54.6 70.2 44.0
Time 11:49:37 AM 11:59:37 AM 0:10:00
Date 07/09/2024 07/09/2024
I I I
-
-
- ' L J J
-
I I I
I I I
I I I
I I
Cursor: (A) Leq=54.6 dB LFmax=70.2 dB LFmin=44.0 dB
OAK_003
12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 07/09/2024 11:49:37 AM - 11:59:37 AM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
OAK_003
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 07/09/2024 11:49:37 AM - 11:59:37 AM dB
L1 = 64.4 dB
L5 = 59.7 dB
L10 = 57.5 dB
L50 = 51.6 dB
L90 = 47.3 dB
L95 = 46.5 dB
L99 = 45.2 dB
Level Cumulative
- - -
\
\
\
I
\
\
\ ,..,-.. ~ I'--_
Cursor: 07/09/2024 11:54:36 AM - 11:54:37 AM LAIeq=48.1 dB LAFmax=48.2 dB LCpeak=73.3 dB LAFmin=46.9 dB OAK_003
11:50:00 AM 11:52:00 AM 11:54:00 AM 11:56:00 AM 11:58:00 AM 20 40
60 80
100
120
140
dB
LAIeq LAFmax LCpeak LAFmin
OAK_003
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 48.1 48.2 46.9
Time 11:54:36 AM 0:00:01
Date 07/09/2024
Cursor: (A) Leq=47.5 dB
OAK_003
12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 07/09/2024 11:54:36 AM - 11:54:37 AM
Hz
LZeq
Cursor: 07/09/2024 11:49:37 AM - 12:49:37 PM LAIeq=56.4 dB LAFmax=70.2 dB LCpeak=90.3 dB LAFmin=44.0 dB OAK_003 Periodic reports
11:50:00 AM 12:00:00 PM 12:10:00 PM 12:20:00 PM 12:30:00 PM 12:40:00 PM 20 40
60 80
100
120
140
dB
LAIeq LAFmax LCpeak LAFmin
-
l
-
J
-
OAK_003 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 56.4 70.2 44.0
Time 11:49:37 AM 0:10:00
Date 07/09/2024
Cursor: (A) Leq=54.6 dB LFmax=70.2 dB LFmin=44.0 dB
OAK_003 Periodic reports
12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 07/09/2024 11:49:37 AM - 11:59:37 AM
Hz
LZeq LZFmax LZFmin
I I I I I I I I
- - -
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
OAK_003 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 07/09/2024 11:49:37 AM - 11:59:37 AM dB
L1 = 64.4 dB
L5 = 59.7 dB
L10 = 57.5 dB
L50 = 51.6 dB
L90 = 47.3 dB
L95 = 46.5 dB
L99 = 45.2 dB
Level Cumulative
\
\
I
\
j
\
1 \ - \
.c::::. }/'\., I'-
L
Site Number: NM-2
Recorded By: Tina Yuan, Darshan Shivaiah
Job Number: 199941
Date: 7/9/2024
Time: 11:14 A.M.
Location: East of the project site (between 412 North Oakhurst Drive and 131 South Doheny Drive; along the alley Source of Ambient Noise: Traffic along alley; residential noise (people talking and doors opening) Noise Data
Leq (dB) Lmax(dB) Lmin (dB)
52.1 71.9 46.8
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 06/04/2023
Microphone Brüel & Kjær 4189 3086765 06/04/2023
Preamp Brüel & Kjær ZC 0032 25380 06/04/2023
Calibrator Brüel & Kjær 4231 2545667 06/04/2023
Weather Data
Est.
Duration: 10 minutes Sky: Clear, Sunny
Note: dBA Offset = -0.04 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 4 mph 78 29.82
Photo of Measurement Location
I
I
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 07/09/2024 11:14:48
End Time: 07/09/2024 11:24:48
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.19
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 07/09/2024 10:46:04
Calibration Type: External reference
Sensitivity: 43.2623401284218 mV/Pa
OAK_001
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 52.1 71.9 46.8
Time 11:14:48 AM 11:24:48 AM 0:10:00
Date 07/09/2024 07/09/2024
I I I
-
-
- ' L J J
-
I I I
I I I
I I I
I I
Cursor: (A) Leq=52.1 dB LFmax=71.9 dB LFmin=46.8 dB
OAK_001
12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 07/09/2024 11:14:48 AM - 11:24:48 AM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
OAK_001
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 07/09/2024 11:14:48 AM - 11:24:48 AM dB
L1 = 58.8 dB
L5 = 54.4 dB
L10 = 53.0 dB
L50 = 51.1 dB
L90 = 49.2 dB
L95 = 48.7 dB
L99 = 47.8 dB
Level Cumulative
- - -
\
_/ f\\_
Cursor: 07/09/2024 11:19:47 AM - 11:19:48 AM LAIeq=52.8 dB LAFmax=53.0 dB LCpeak=75.4 dB LAFmin=51.4 dB OAK_001
11:15:00 AM 11:17:00 AM 11:19:00 AM 11:21:00 AM 11:23:00 AM 20 40
60 80
100
120
140
dB
LAIeq LAFmax LCpeak LAFmin
OAK_001
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 52.8 53.0 51.4
Time 11:19:47 AM 0:00:01
Date 07/09/2024
I
I I
1"1,.,m .Jl.1, u\11 ~ Ir" t,,,.J"\i1P,~r~ ,....,.,.,.-. ~,,...,•·'~1
I I I I I I I I
Cursor: (A) Leq=52.0 dB
OAK_001
12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 07/09/2024 11:19:47 AM - 11:19:48 AM
Hz
LZeq
Cursor: 07/09/2024 11:14:48 AM - 12:14:48 PM LAIeq=55.5 dB LAFmax=71.9 dB LCpeak=93.3 dB LAFmin=46.8 dB OAK_001 Periodic reports
11:20:00 AM 11:30:00 AM 11:40:00 AM 11:50:00 AM 12:00:00 PM 12:10:00 PM 20 40
60 80
100
120
140
dB
LAIeq LAFmax LCpeak LAFmin
-
l
L l J
OAK_001 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 55.5 71.9 46.8
Time 11:14:48 AM 0:10:00
Date 07/09/2024
Cursor: (A) Leq=52.1 dB LFmax=71.9 dB LFmin=46.8 dB
OAK_001 Periodic reports
12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 07/09/2024 11:14:48 AM - 11:24:48 AM
Hz
LZeq LZFmax LZFmin
I I I I I I I I
- - -
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
OAK_001 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 07/09/2024 11:14:48 AM - 11:24:48 AM dB
L1 = 58.8 dB
L5 = 54.4 dB
L10 = 53.0 dB
L50 = 51.1 dB
L90 = 49.2 dB
L95 = 48.7 dB
L99 = 47.8 dB
Level Cumulative
\
l
I
\ -
A\\
L
Site Number: NM-3
Recorded By: Tina Yuan, Darshan Shivaiah
Job Number: 199941
Date: 7/9/2024
Time: 11:34 A.M.
Location: In front of 348 North Oakhurst Drive
Source of Ambient Noise: Traffic along Oakhurst Drive
Noise Data
Leq (dB) Lmax(dB) Lmin (dB)
54.1 70.2 42.6
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 06/04/2023
Microphone Brüel & Kjær 4189 3086765 06/04/2023
Preamp Brüel & Kjær ZC 0032 25380 06/04/2023
Calibrator Brüel & Kjær 4231 2545667 06/04/2023
Weather Data
Est.
Duration: 10 minutes Sky: Clear, Sunny
Note: dBA Offset = -0.04 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 4 mph 78 29.82
Photo of Measurement Location
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 07/09/2024 11:34:28
End Time: 07/09/2024 11:46:10
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.19
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 07/09/2024 10:46:04
Calibration Type: External reference
Sensitivity: 43.2623401284218 mV/Pa
OAK_002
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 54.1 70.4 42.6
Time 11:34:28 AM 11:46:10 AM 0:10:00
Date 07/09/2024 07/09/2024
I I I
-
-
- ' L J J
-
I I I
I I I
I I I
I I
Cursor: (A) Leq=54.1 dB LFmax=70.4 dB LFmin=42.6 dB
OAK_002
12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 07/09/2024 11:34:28 AM - 11:46:10 AM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
OAK_002
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 07/09/2024 11:34:28 AM - 11:46:10 AM dB
L1 = 65.7 dB
L5 = 60.6 dB
L10 = 57.1 dB
L50 = 48.2 dB
L90 = 44.8 dB
L95 = 44.2 dB
L99 = 43.5 dB
Level Cumulative
- - -
\
I
I
\
\
\
'\
~ ~
Cursor: 07/09/2024 11:39:28 AM - 11:39:29 AM LAIeq=48.6 dB LAFmax=47.9 dB LCpeak=70.8 dB LAFmin=46.7 dB OAK_002
11:36:00 AM 11:38:00 AM 11:40:00 AM 11:42:00 AM 11:44:00 AM 11:46:00 AM 20 40
60 80
100
120
140
dB
LAIeq LAFmax LCpeak LAFmin
OAK_002
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 48.6 47.9 46.7
Time 11:39:28 AM 0:00:01
Date 07/09/2024
Cursor: (A) Leq=47.2 dB
OAK_002
12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 07/09/2024 11:39:28 AM - 11:39:29 AM
Hz
LZeq
Cursor: 07/09/2024 11:34:28 AM - 12:34:28 PM LAIeq=55.7 dB LAFmax=70.4 dB LCpeak=90.8 dB LAFmin=42.6 dB OAK_002 Periodic reports
11:40:00 AM 11:50:00 AM 12:00:00 PM 12:10:00 PM 12:20:00 PM 12:30:00 PM 20 40
60 80
100
120
140
dB
LAIeq LAFmax LCpeak LAFmin
-
l
L l J
OAK_002 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 55.7 70.4 42.6
Time 11:34:28 AM 0:10:00
Date 07/09/2024
Cursor: (A) Leq=54.1 dB LFmax=70.4 dB LFmin=42.6 dB
OAK_002 Periodic reports
12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 07/09/2024 11:34:28 AM - 11:44:28 AM
Hz
LZeq LZFmax LZFmin
I I I I I I I I
- - -
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
OAK_002 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 07/09/2024 11:34:28 AM - 11:44:28 AM dB
L1 = 65.7 dB
L5 = 60.6 dB
L10 = 57.1 dB
L50 = 48.2 dB
L90 = 44.8 dB
L95 = 44.2 dB
L99 = 43.5 dB
Level Cumulative
J
\
J
1 \
\
\ - '\
--- I"---- L
L
Site Number: NM-4
Recorded By: Tina Yuan, Darshan Shivaiah
Job Number: 199941
Date: 7/9/2024
Time: 12:09 P.M.
Location: In front of 401 Maple Drive
Source of Ambient Noise: Traffic along Maple Drive
Noise Data
Leq (dB) Lmax(dB) Lmin (dB)
63.1 86.2 48.1
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 06/04/2023
Microphone Brüel & Kjær 4189 3086765 06/04/2023
Preamp Brüel & Kjær ZC 0032 25380 06/04/2023
Calibrator Brüel & Kjær 4231 2545667 06/04/2023
Weather Data
Est.
Duration: 10 minutes Sky: Clear, Sunny
Note: dBA Offset = -0.04 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 4 mph 78 29.82
Photo of Measurement Location
I
I
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 07/09/2024 12:09:24
End Time: 07/09/2024 12:19:24
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.19
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 07/09/2024 10:46:04
Calibration Type: External reference
Sensitivity: 43.2623401284218 mV/Pa
OAK_004
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 63.1 86.2 48.1
Time 12:09:24 PM 12:19:24 PM 0:10:00
Date 07/09/2024 07/09/2024
I I I
-
-
- ' L J J
-
I I I
I I I
I I I
I I
Cursor: (A) Leq=63.1 dB LFmax=86.2 dB LFmin=48.1 dB
OAK_004
12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 07/09/2024 12:09:24 PM - 12:19:24 PM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.1% Cumulative: 0.7%
OAK_004
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 07/09/2024 12:09:24 PM - 12:19:24 PM dB
L1 = 76.6 dB
L5 = 65.0 dB
L10 = 62.6 dB
L50 = 56.7 dB
L90 = 51.6 dB
L95 = 50.7 dB
L99 = 49.5 dB
Level Cumulative
- - -
\
\
\
\
\
\
\
I
\
- ~ r---...
Cursor: 07/09/2024 12:14:23 PM - 12:14:24 PM LAIeq=64.0 dB LAFmax=65.0 dB LCpeak=86.0 dB LAFmin=61.3 dB OAK_004
12:10:00 PM 12:12:00 PM 12:14:00 PM 12:16:00 PM 12:18:00 PM 20 40
60 80
100
120
140
dB
LAIeq LAFmax LCpeak LAFmin
OAK_004
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 64.0 65.0 61.3
Time 12:14:23 PM 0:00:01
Date 07/09/2024
Cursor: (A) Leq=63.9 dB
OAK_004
12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 07/09/2024 12:14:23 PM - 12:14:24 PM
Hz
LZeq
Cursor: 07/09/2024 12:09:24 PM - 01:09:24 PM LAIeq=67.1 dB LAFmax=86.2 dB LCpeak=99.6 dB LAFmin=48.1 dB OAK_004 Periodic reports
12:10:00 PM 12:20:00 PM 12:30:00 PM 12:40:00 PM 12:50:00 PM 01:00:00 PM 20 40
60 80
100
120
140
dB
LAIeq LAFmax LCpeak LAFmin
-
l
-
L l J
--
OAK_004 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 67.1 86.2 48.1
Time 12:09:24 PM 0:10:00
Date 07/09/2024
Cursor: (A) Leq=63.1 dB LFmax=86.2 dB LFmin=48.1 dB
OAK_004 Periodic reports
12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 07/09/2024 12:09:24 PM - 12:19:24 PM
Hz
LZeq LZFmax LZFmin
I I I I I I I I
- - -
Cursor: [78.2 ; 78.4[ dB Level: 0.1% Cumulative: 0.7%
OAK_004 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 07/09/2024 12:09:24 PM - 12:19:24 PM dB
L1 = 76.6 dB
L5 = 65.0 dB
L10 = 62.6 dB
L50 = 56.7 dB
L90 = 51.6 dB
L95 = 50.7 dB
L99 = 49.5 dB
Level Cumulative
'
j
\
\
\
_l
\
j
Ii -
~- ..,.,,,, "-rL
Site Number: Long-Term – 1
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 199941
Date: 07/10/2024
Time: 11:00 AM
Location: Meter was placed along the southern property line at approximately 30 feet from western property line.
Source of Ambient Noise: Typical urban related activities Noise Data
Ldn (dB) LDay(dB) LNight (dB)
Equipment
Category Type Vendor Microphone Serial No. Note
Sound Sound Level Meter SoundExpert 821 377B02 40078 N/A Weather Data
Est.
Duration: 24 hours Sky: Sunny
Note: dBA Offset = 0.02 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 4 mph 79 29.82
Photo of Measurement Location
I I I I I
I I I I I
I
I
SoundExpert 821 Summary: 2024-07-11 13:07:16
User:
Location:
Job Description:
Notes:
Meter General Information
Model Serial
Meter SoundExpert 821 40078
Preamp PRM821
Microphone 377B02
Overall Measurement
Start Date & Time 2024-07-09 11:03:15
Stop Date & Time 2024-07-10 12:00:56
Run Time 24:57:41
Pre-Calibration Deviation (Cal Lvl) 0.01 dB (114.0 dB) 2024-07-09 11:02:28 Pre-Sensitivity -26.1 dB
Post-Calibration Deviation (Cal Lvl) ---(---) ---
Post-Sensitivity ---
A C Z
Lweq 65.1 70.4 73.4
Lwpk 131.7 dB 139.2 dB 141.8 dB
2024-07-10 11:58:34 2024-07-09 11:03:23 2024-07-09 11:03:23 LwSmin 38.8 dB 54.4 dB 56.8 dB
2024-07-10 03:03:30 2024-07-10 03:17:01 2024-07-10 03:17:01 LwSmax 114.0 dB 115.7 dB 119.8 dB
2024-07-09 11:03:16 2024-07-09 11:03:23 2024-07-09 11:03:23 LwFmin 38.0 dB 52.4 dB 54.6 dB
2024-07-10 03:03:27 2024-07-10 03:11:35 2024-07-10 03:17:01 LwFmax 114.0 dB 124.4 dB 127.8 dB
2024-07-09 11:03:15 2024-07-09 11:03:23 2024-07-09 11:03:23 LwImin 39.8 dB 56.7 dB 59.2 dB
2024-07-10 02:09:34 2024-07-10 03:16:49 2024-07-10 03:16:54 LwImax 114.0 dB 128.8 dB 131.5 dB
2024-07-09 11:03:15 2024-07-09 11:03:23 2024-07-09 11:03:23 w = frequency weighting (A, C or Z)
Community Noise LDN LDay (07:00-22:00) LNight (22:00-07:00)
65.4 dB 67.0 dB 49.6 dB
LDEN LDay (07:00-19:00) LEve (19:00-22:00) LNight (22:00-07:00)
65.4 dB 67.9 dB 52.8 dB 49.6 dB
LCeq - LAeq 5.3 dB
Overload Count 0
Overload Duration 00:00:00
A C Z
Under Range Peak 50.0 dB 50.0 dB 62.0 dB
Under Range Limit 24.0 dB 27.0 dB 37.0 dB
Noise Floor 17.0 dB 18.0 dB 25.0 dB
Statistics
LAS 5 58.2 dB
LAS 10 55.9 dB
LAS 33.3 49.5 dB
LAS 50 47.4 dB
LAS 66.6 45.5 dB
LAS 90 41.3 dB
Michael Baker
INTERNATIONAL
Virtual Dosimeters
1 2 3 4
OSHA-PEL OSHA-HC ACGIH NIOSH
Dose 0.3% 0.3% 5.7% 5.7%
Projected Dose 0.1% 0.1% 1.8% 1.8% Lavg 39.3 dB 40.2 dB 67.7 dB 67.7 dB TWA(8) 47.5 dB 48.4 dB 72.6 dB 72.6 dB
Projected TWA(8) 39.3 dB 40.2 dB 67.7 dB 67.7 dB
Criterion Level 90.0 dB 90.0 dB 85.0 dB 85.0 dB
Threshold Level 90.0 dB 80.0 dB 80.0 dB 80.0 dB
Exchange Rate 5 dB 5 dB 3 dB 3 dB
LEP'd/Lex,8h 70.1 dB 70.1 dB 70.1 dB 70.1 dB
Projected LEP'd/Lex,8h 65.1 dB 65.1 dB 65.1 dB 65.1 dB
Shift Time 8 hours 8 hours 8 hours 8 hours
Exceedances
Count Duration
LAS > 85 dB6 21
LAS > 95 dB39
LCpk > 135 dB11
LCpk > 137 dB11
LCpk > 140 dB00
Sound Exposure
SEL
A 114.7 dB
EA (Pa²s) 116.8 Pa²s
EA,8 h (Pa²s) 37.4 Pa²s EA,40 h (Pa²s) 187.2 Pa²s EA
(Pa²h) 0.0 Pa²h
EA,8 h (Pa²h) 0.0 Pa²h EA,40 h (Pa²h) 0.1 Pa²h
Powered by Larson Davis
Time History
>- u
C:
Q)
:J
O'
Q)
'-
LL.
Vl
Q)
:J
<ii
>
140
105
70 35
0 20kHz
8kHz
lkHz
l00Hz
6.3Hz
Overall OBA
140
co 109 'O
Q) 78
> Q)
...J 48
17.5 6.3
~
12 00
12 00
T
16 00
16 00
20 A
T T
2000 04 00 12 0
l 0. Jul 08 00
-LApk
2000 l 0. Jul 04 00 08 00 12 00
25 dB 50 dB 75 dB
l J J J J J J J J J J J
63 200 630 2k 6.3k 20k
[ • Leq e Lmax • Lmin )
Appendix B
Construction Noise Management Plan
Oakhurst Skyline, LLC
150 South Rodeo Drive, #340
Beverly Hills, CA 90212
412 North Oakhurst Drive | (310) 651-1000 | www.wilshireskyline.com August, 12, 2024
City of Beverly Hills
455 North Rexford Drive
Beverly Hills, CA 90210
Attn: Minjee Hahm
Dear Ms. Hahm,
This Construction Noise Management Plan (CNMP) for the proposed Oakhurst Apartments Project (project), located in the City of Los Angeles and City of Beverly Hills, California describes the best management practices that the contractor will implement to minimize noise disruptions on surrounding properties during construction and to ensure compliance with the City of Los Angeles and City of Beverly Hills noise ordinance.
The project site is surrounded with sensitive receptors to the north, east, and south. The receptors (multifamily residences) to the north are located approximately 15 feet from the project site boundary, the receptors (multi-family residences) to the east are located approximately 35 feet from the project site boundary, and the receptors (multi-family residences) to the south are located approximately 20 feet from the project site boundary. These receptors could be exposed to temporary and intermittent construction noise levels. The project would implement the techniques described below to manage noise generated from project construction.
Construction Noise Control Techniques
To manage construction noise, the project includes the following:
• Construction contracts will specify that all construction equipment, fixed or mobile, will be equipped with properly operating and maintained mufflers and other state-required noise attenuation devices. • A sign, legible at a distance of 50 feet, will be posted at the project construction site providing a contact name and a telephone number where residents can inquire about the construction process and register complaints. This sign will indicate the dates and duration of construction activities. In conjunction with this required posting, a noise disturbance coordinator will be identified to address construction noise concerns received. The coordinator will be responsible for responding to any local complaints about construction noise. When a complaint is received, the disturbance coordinator will notify both the City of Los Angeles and City of Beverly Hills within 24 hours of the complaint and determine the cause of the noise complaint (starting too early, malfunctioning muffler, etc.) and will implement reasonable measures to resolve the complaint. All signs posted at the construction site will include the contact name and the telephone number for the noise disturbance coordinator.
• During construction, stationary construction equipment will be placed such that emitted noise is directed away from sensitive noise receivers.
• Per Section 41.40 of the City of Los Angeles Municipal Code, construction activities will be limited to the hours between 7:00 a.m. and 9:00 p.m. on all days. Per the City of Beverly Hills Noise Ordinance, construction will be limited to the hours between 8:00 a.m. and 6:00 p.m. on any days and all construction activities will be prohibited on Sundays and holidays. To comply with the City of Los Angeles and City of Beverly Hills requirements, construction of the project will only occur during the hours of 8:00 a.m. and 6:00 p.m. on all days. Construction will not occur during Sundays and holidays.
5 Hutton Centre Drive, Suite 500, Santa Ana, CA 92707
Office: 949.472.3505 | Fax: 949.472.8373
M E M O R A N D U M
To: Kristen Bogue, Michael Baker International
From: Zhe Chen, Michael Baker International
Date: September 27, 2024
Subject: Oakhurst Apartments Project – Air Quality Assessment
PURPOSE
The purpose of this technical memorandum is to evaluate potential short- and long-term air quality impacts that would result from the construction and operation of the proposed Oakhurst Apartments Project (project), located in the Cities of Los Angeles and Beverly Hills, California.
PROJECT LOCATION
The community of Beverly Grove is a neighborhood within the City of Los Angeles, regionally located in the western portion of Los Angeles County (County), approximately six miles west of Downtown Los Angeles; refer to Exhibit 1, Regional Vicinity Map. Surrounding communities include Hollywood to the north, Silverlake-Echo Park and Westlake to the east, South Central Los Angeles and West Adams-LeimertBaldwin Hills to the south, and West Los Angeles to the west. The City of Beverly Hills is roughly 5.7 square miles and located in the southwestern portion of the County, approximately 8.5 miles northwest of Downtown Los Angeles. Surrounding jurisdictions include the City of Los Angeles along all sides and the City of West Hollywood to the east.
The project site is specifically located at 412 North Oakhurst Drive within the Cities of Los Angeles and Beverly Hills. As shown on Exhibit 2, Site Vicinity, the site encompasses approximately 0.35-acre (0.10- acre within Beverly Hills and 0.25-acre within Los Angeles) bordered to the west by North Oakhurst Drive.
Surrounding land uses generally include residential uses on all sides. Regional access to the site is provided via State Route 2 (SR-2; Santa Monica Boulevard), Interstate 10 (I-10), State Route 187 (SR-187; Venice Boulevard), and Interstate 405 (I-405). Local access to the site is provided via Beverly Boulevard, Burton Way, South Doheny Drive, and North Oakhurst Drive.
EXISTING SITE CONDITIONS
The project site is currently developed with an existing occupied multi-family residential building located at 412 North Oakhurst Drive within the portion of the lot located within the City of Beverly Hills (within Beverly Hills; Assessor’s Parcel Number [APN] 4335-006-043) and within the portion of the lot located within the City of Los Angeles (within Los Angeles; APN 4335-006-044). The existing residential building is approximately 32,400-gross square feet and includes 15 residential units that are a maximum of three Oakhurst Apartments Project 2
Air Quality Assessment
stories.1 According to the General Plan Land Use Designations – City of Beverly Hills (Beverly Hills General Plan Land Use Map) and General Plan Land Use Map, Wilshire Community Plan (Los Angeles General Plan Land Use Map), the project site is currently designated Multi-Family Residential, High Density (within the portion of the lot located within the City of Beverly Hills) and High Medium Residential (within the portion of the lot located within the City of Los Angeles).2,3 The on-site designations allow for a maximum density of 50 dwelling units per acre (du/acre) within the portion of the lot located within the City of Beverly Hills and between 55 and 109 du/acre within the portion of the lot located within the City of Los Angeles.
Additionally, the portion of the lot located within the City of Beverly Hills allows for a 60-foot maximum building height. The portion of the lot located within the City of Los Angeles does not designate a maximum building height.The City of Beverly Hills portion of the lot is zoned Multiple Residential Zone (R4) and the City of Los Angeles portion of the lot is zoned Qualified Classification, Multiple Dwelling Zone, Height District No. 1, Oil Drilling District ([Q]R4-1-O).
Surrounding uses adjacent to the project site include residential land uses. The project site is located within walking distance of single-family homes, condominiums and apartments, as well as offices, retail stores, restaurants, and other commercial businesses along Beverly Boulevard.
PROJECT DESCRIPTION
The proposed project would involve demolishing the existing 15-unit multi-family residential building and associated parking garage and constructing a new multi-family residential (apartment) building (up to eight stories in height), landscaping, open space, and two levels of basement parking; refer to Exhibit 3, Site Plan. The building would include 52 residential units (12 residential units within the City of Beverly Hills and 40 units within the City of Los Angeles). The residential unit options would include studios through three-bedroom units. The proposed building would include common open space amenities including: a trash room, recycling room, mail room, and long-term bicycle storage room located on the first floor; a bicycle parking/maintenance room and a landscaped outdoor courtyard located on the second floor; a recreation room located on the third floor; a gym located on the fourth floor; and common space located on the fifth floor. The rooftop would include screened mechanical equipment and an area reserved for future solar panel use. Ancillary facilities, such as an elevator lobby, elevators, and stairs are also proposed.
The two basement parking levels would accommodate 66 standard parking spaces (18 standard spaces within the City of Beverly Hills and 48 standard spaces within the City of Los Angeles). Bicycle parking/storage, various utility related rooms (i.e., mechanical and electrical), and storage facilities would also be located on the basement levels. Total parking spaces, including parking at grade within the City of Los Angeles, would be 75.
1 “Gross” (square feet) is used to describe the total area of enclosed space measured from the exterior walls of a building, including unusable spaces (e.g., areas between walls, structural columns, or shafts); “net” (square feet) is used to describe the total area of enclosed space measured from the inside finished surface of surrounding walls that is available for furnishing, equipment, and personnel and excludes any unusable spaces. 2 City of Beverly Hills, General Plan Land Use Designations – City of Beverly Hills, https://www.beverlyhills.org/cbhfiles/storage/files/1807037749744115284/Landuse_11x17_20220125.pdf, accessed July 8, 2024. 3City of Los Angeles, General Plan Land Use Map, Wilshire Community Map, https://planning.lacity.gov/odocument/2ec22248- 3c1e-4354-b5d1-096cdf9845ab/wilplanmap.pdf, accessed July 8, 2024.
OAKHURST APARTMENTS PROJECT
AIR QUALITY ASSESSMENT
Exhibit 1
Regional Vicinity NOT TO SCALE
08/2024 • JN 199941
P A C I F I C
O C E A N
Pyramid
Lake
Lake
Piru
Castaic
Lake
101
101
1 1
2 1
5 5
5 126
118 118
241
142
134
261
133
138
138
138
405
405
605
710
110
110
10 10
210
210
210
10 405
23 2
2 14
14 18
23 23
27 55
91 90
90 57
60 60
30 71
22 Upland
Pomona
Chino
Palmdale
Lancaster
Pasadena
Alhambra
Monterey Park
Pico
Rivera
Downey
South
Gate
Compton
Carson
Hawthorne
Inglewood
Culver
City
Santa
Monica
Sherman
Oaks
Van
Nuys
Hollywood
Bellflower
Lakewood
Arcadia
Monrovia Azuza
Claremont
San
Dimas
West
Covina
La Habra
Heights
Brea
Walnut
Covina Baldwin
Park
Whittier
La
Mirada
Burbank
Pacoima
Glendale
Los
Angeles
Torrance
San
Pedro
Long
Beach
Huntington
Beach
Newport Beach
Santa
Ana
Costa
Mesa
Garden
Grove
Anaheim
Tustin
Orange
Fullerton
Yorba
Linda
Irvine
Lake
Forest
Fillmore Piru
Moorpark
Thousand
Oaks
Simi
Valley
Castaic
Gorman
Lebec
Santa
Clarita
Sylmar
Agoura Hills Woodland
Hills
Canoga
Park
Chatsworth
Westlake
Village
Calabasas
Malibu
Palos
Verdes
Estates
Redondo Beach
Manhattan Beach
El Segundo
Playa Del Rey
Marina
Del Rey
Beverly
Hills
ORANGE
COUNTY
VENTURA
COUNTY
LOS ANGELES
COUNTY
KERN COUNTY
PROJECT
SITE
OAKHURST APARTMENTS PROJECT
AIR QUALITY ASSESSMENT
Exhibit 2
Site Vicinity
Source: Google Earth Pro, August 2024
NOT TO SCALE
08/2024 • JN 199941
OAKHURST DR
N DOHENY DR
PALM DR
PROJECT SITE
OAKHURST APARTMENTS PROJECT
AIR QUALITY ASSESSMENT
Exhibit 3
Site Plan
Source: SPF: architects, August 2024
NOT TO SCALE
08/2024 • JN 199941
DN
2 A
E
1 6
C
3 4 5
D
8 B
PROPOSED 8-STORY
MULTIFAMILY BUILDING W/ TWO
LEVELS SUBTERRANEAN PARKING CITY OF BEVERLY HILLS
JURISDICTION
PUBLIC RIGHT OF
WAY
PROJECT SITE
CL OF ALLEY
TRANSFORMER
PL (102'-7 3/4")
PL (149' - 11 1/2")
PL (102'-7 3/4")
PL (149' - 11 1/2")
BASEMENT PARKINGDRIVEWAYENTRANCE + EXIT
LABH
LABH
LOS ANGELES
OUTLINE OF EXISTING
BUILDING TO BE
DEMOLISHED
OAKHURST DR.
PAVING
PLANTING - SEE
LANDSCAPE DWGS
PLANTED PARKWAY
TO REMAIN
LEGEND
LEVEL 01 PARKINGENTRANCE + EXIT
5'-0" OFFSET LINE
FROM BUILDING
100.25' LOWEST ADJ.
GRADE WITHIN 5' OF
BUILDING LINE
FDC SIAMESE CONNECTION
(E) STREET TREE TO REMAIN (4)
SIDEWALK TO BE REMOVED
AND REPLACED PER CITY
STANDARDS
PLANTED PARKWAY TO REMAIN
DRIVEWAY CURB CUT TO BE
REMOVED AND REPLACED
WITH PLANTING
PUBLIC RIGHT
OF WAY
PROJECT SITE
SETBACK
15' - 0" 27' - 7" 107' - 5"
BEVERLY HILLS
42' - 7"
CITY OF LA
107' - 5"
SETBACK
9' - 0" 84' - 8"
SETBACK
9' - 0"
PLANTER WALL PER
LANDSCAPE - SHALL COMPLY
WITH 10-3-2814, PLASTER
FINISH ON BOTH SIDES,
TYPICAL
EGRESS PATH
3' - 8" 70' - 2" 5' - 0" 19' - 7"
EGRESS PATH
3' - 8"
PLANTING TO PROVIDE
PRIVATE DECK SCREENING.
SEE LANDSCAPE ELEVATION
PLANTING TO PROVIDE
PRIVATE DECK SCREENING.
SEE LANDSCAPE ELEVATION
THIRD PAVED WALKWAY
TO EGRESS STAIRS
BUILDING ENTRY
(WALKWAY 1)
EGRESS PATH
(WALKWAY 2)
EGRESS PATH
(WALKWAY 3)
6' - 0"
1 A 403
____
1 A 402
____
1 A 401
____
1 A 400
____
6"
6"
TREES PER LANDSCAPE
TREES PER LANDSCAPE
REV. ISSUE
DRAWN BY:
PROJECT NO
CHECKED BY
SCALE:
SHEET NO:
HALF SC
NORTH
A 1
OAKHURST APARTMENTS
SITE PLAN
1 SCALE: 1/8" = 1'-0"
SITE PLAN - BH
1 SB330 SUBMITT
2 SB330 RESUBM
3 SB330 RESUBM
4 SB330 RESUBM
5 SB330 RESUBM
6 SB330 RESUBM
7 SB330 RESUBM
8 SB330 RESUBM
Oakhurst Apartments Project 6
Air Quality Assessment
Construction activities would include demolition, grading, building construction, and the application of architectural coatings. Construction activities and would occur over approximately 32 months, beginning in approximately October 2025 and ending May 2028. The proposed earthwork would result in approximately 19,000 cubic yards of soil export and demolition of approximately 32,400-gross square feet of an existing residential building.
CRITERIA AIR POLLUTANTS
Air quality is a general description of how levels of air pollution and other atmospheric conditions can affect public health and the environment. Under the Federal Clean Air Act (FCAA), the U.S. Environmental Protection Agency (EPA) has identified six air pollutants that are environmentally prevalent and produced by human activities to be of concern with respect to health, the environment and welfare of the public.
These specific pollutants, known as criteria air pollutants, are pollutants for which the federal and state governments have established ambient air quality standards—or criteria—for outdoor concentrations to protect public health. These pollutants are common byproducts of human activities and have been documented through scientific research to cause various adverse health effect outcomes. The federal ambient concentration criteria are known as the National Ambient Air Quality Standards (NAAQS), and the California ambient concentration criteria are referred to as the California Ambient Air Quality Standards (CAAQS). The criteria air pollutants regulated at the federal jurisdiction include carbon monoxide (CO), ground-level ozone (O3), nitrogen dioxide (NO2), respirable particulate matter ten microns or less in diameter (PM10), fine particulate matter 2.5 microns or less in diameter (PM2.5), sulfur dioxide (SO2), and lead (Pb).
Carbon Monoxide (CO). CO is an odorless, colorless toxic gas that is emitted by mobile and stationary sources as a result of incomplete combustion of hydrocarbons or other carbon-based fuels. In cities, automobile exhaust can cause as much as 95 percent of all CO emissions. CO replaces oxygen in the body’s red blood cells. Individuals with a deficient blood supply to the heart, patients with diseases involving heart and blood vessels, fetuses (unborn babies), and patients with chronic hypoxemia (oxygen deficiency) as seen in high altitudes are most susceptible to the adverse effects of CO exposure. People with heart disease are also more susceptible to developing chest pains when exposed to low levels of CO.
Ozone (O3). O3 occurs in two layers of the atmosphere. The layer surrounding the earth’s surface is the troposphere. The troposphere extends approximately 10 miles above ground level, where it meets the second layer, the stratosphere. The stratospheric (the “good” O3 layer) extends upward from about 10 to 30 miles and protects life on earth from the sun’s harmful ultraviolet rays. “Bad” O3 is a photochemical pollutant, and needs volatile organic compounds (VOCs), nitrogen oxides (NOX), and sunlight to form; therefore, VOCs and NOX are O3 precursors. To reduce O3 concentrations, it is necessary to control the emissions of these O3 precursors. Significant O3 formation generally requires an adequate amount of precursors in the atmosphere and a period of several hours in a stable atmosphere with strong sunlight.
High O3 concentrations can form over large regions when emissions from motor vehicles and stationary sources are carried hundreds of miles from their origins.
While O3 in the upper atmosphere (stratosphere) protects the earth from harmful ultraviolet radiation, high concentrations of ground-level O3 (in the troposphere) can adversely affect the human respiratory system and other tissues. O3 is a strong irritant that can constrict the airways, forcing the respiratory system to work hard to deliver oxygen. Individuals exercising outdoors, children, and people with preexisting lung disease such as asthma and chronic pulmonary lung disease are considered to be the most susceptible to the health effects of O3. Short-term exposure (lasting for a few hours) to O3 at elevated Oakhurst Apartments Project 7
Air Quality Assessment
levels can result in aggravated respiratory diseases such as emphysema, bronchitis and asthma, shortness of breath, increased susceptibility to infections, inflammation of the lung tissue, increased fatigue, as well as chest pain, dry throat, headache, and nausea.
Nitrogen Dioxide (NO2). NOX are a family of highly reactive gases that are a primary precursor to the formation of ground-level O3 and react in the atmosphere to form acid rain. NO2 (often used interchangeably with NOX) is a reddish-brown gas that can cause breathing difficulties at elevated levels.
Peak readings of NO2 occur in areas that have a high concentration of combustion sources (e.g., motor vehicle engines, power plants, refineries, and other industrial operations). NO2 can irritate and damage the lungs and lower resistance to respiratory infections such as influenza. The health effects of short-term exposure are still unclear. However, continued or frequent exposure to NO2 concentrations that are typically much higher than those normally found in the ambient air may increase acute respiratory illnesses in children and increase the incidence of chronic bronchitis and lung irritation. Chronic exposure to NO2 may aggravate eyes and mucus membranes and cause pulmonary dysfunction.
Coarse Particulate Matter (PM10). PM10 refers to suspended particulate matter, which is smaller than 10 microns or ten one-millionths of a meter. PM10 arises from sources such as road dust, diesel soot, combustion products, construction operations, and dust storms. PM10 scatters light and significantly reduces visibility. In addition, these particulates penetrate into lungs and can potentially damage the respiratory tract. On June 19, 2003, the California Air Resources Board (CARB) adopted amendments to the statewide 24-hour particulate matter standards based upon requirements set forth in the Children’s Environmental Health Protection Act (Senate Bill 25). Exposure to PM10 would result in particles being deposited on the lung surface, causing tissue damage, lung inflammation, and impacting respiratory and cardiovascular health.
Fine Particulate Matter (PM2.5). Due to recent increased concerns over health impacts related to fine particulate matter (particulate matter 2.5 microns in diameter or less), both State and Federal PM2.5 standards have been created. Particulate matter impacts primarily affect infants, children, the elderly, and those with pre-existing cardiopulmonary disease. In 1997, the EPA announced new PM2.5 standards.
Industry groups challenged the new standard in court and the implementation of the standard was blocked. However, upon appeal by the EPA, the United States Supreme Court reversed this decision and upheld the EPA’s new standards.
On January 5, 2005, the EPA published a Final Rule in the Federal Register that designates the South Coast Air Basin (Basin) as a nonattainment area for Federal PM2.5 standards. On June 20, 2002, CARB adopted amendments for statewide annual ambient particulate matter air quality standards. These standards were revised/established due to increasing concerns by CARB that previous standards were inadequate, as almost everyone in California is exposed to levels at or above the current State standards during some parts of the year, and the statewide potential for significant health impacts associated with particulate matter exposure was determined to be large and wide-ranging. On July 8, 2016, EPA made a finding that the Basin has attained the 1997 24-hour and annual PM2.5 standards based on 2011-2013 data. However, the Basin remains in nonattainment as the EPA has not determined that California has met the FCAA requirements for redesignating the Basin nonattainment area to attainment.
Due to the size of PM2.5, these particles are more likely to be inhaled and deposited in the deeper parts of the lungs. Short-term exposure (up to 24 hours) would result in chronic bronchitis, asthma attacks, respiratory symptoms, and premature mortality.
Oakhurst Apartments Project 8
Air Quality Assessment
Sulfur Dioxide (SO2). Sulfur dioxide (SO2) is a colorless, irritating gas with a rotten egg smell; it is formed primarily by the combustion of sulfur-containing fossil fuels. Sulfur dioxide is often used interchangeably with SOX. Exposure of a few minutes to low levels of SO2 can result in airway constriction in some asthmatics.
Volatile Organic Compounds (VOC). VOCs are hydrocarbon compounds (any compound containing various combinations of hydrogen and carbon atoms) that exist in the ambient air. VOCs contribute to the formation of smog through atmospheric photochemical reactions and/or may be toxic. Compounds of carbon (also known as organic compounds) have different levels of reactivity; that is, they do not react at the same speed or do not form O3 to the same extent when exposed to photochemical processes. VOCs often have an odor, and some examples include gasoline, alcohol, and the solvents used in paints.
Exceptions to the VOC designation include carbon monoxide, carbon dioxide, carbonic acid, metallic carbides or carbonates, and ammonium carbonate. VOC is not considered a criteria pollutant; however, it is a precursor to O3, which is a criteria pollutant. VOCs are a criteria pollutant since they are a precursor to O3, which is a criteria pollutant. The terms VOC and ROG (see below) are used interchangeably.
Exposure to VOC vapors would result in eyes, nose, and throat irritation, nausea, headaches, and damage to the liver, kidney, and central nervous system.
Reactive Organic Gases (ROG). Similar to VOCs, ROGs are also precursors in forming O3 and consist of compounds containing methane, ethane, propane, butane, and longer chain hydrocarbons, which are typically the result of some type of combustion/decomposition process. Smog is formed when ROG and nitrogen oxides react in the presence of sunlight. ROGs are a criteria pollutant since they are a precursor to O3, which is a criteria pollutant. The terms ROG and VOC are used interchangeably. Exposure to ROGs would result in the same adverse health effects as VOCs.
EXISITNG SETTING
Regional Topography
The CARB divides the State into 15 air basins that share similar meteorological and topographical features.
The project site lies within the South Coast Air Basin. The Basin is a 6,600 square mile area bounded by the Pacific Ocean to the west and the San Gabriel, San Bernardino, and San Jacinto Mountains to the north and east. The Basin includes all of Orange County and the non-desert portions of Los Angeles, Riverside, and San Bernardino Counties, in addition to the San Gorgonio Pass area in Riverside County. The Basin’s terrain and geographical location (i.e., a coastal plain with connecting broad valleys and low hills) determine its distinctive climate.
The extent and severity of the air pollution problem in the Basin is a function of the area’s natural physical characteristics (weather and topography), as well as man-made influences (development patterns and lifestyle). Factors such as wind, sunlight, temperature, humidity, rainfall, and topography all affect the accumulation and/or dispersion of pollutants throughout the Basin.
Climate
The general region lies in the semi-permanent high-pressure zone of the eastern Pacific Ocean. As a result, the climate is mild, tempered by cool sea breezes. The climate consists of a semi-arid environment with mild winters, warm summers, moderate temperatures, and comfortable humidity. The typical mild Oakhurst Apartments Project 9
Air Quality Assessment
climatological pattern is interrupted infrequently by periods of extremely hot weather, winter storms, or Santa Ana winds. Precipitation is limited to a few winter storms.
The average annual temperature varies little throughout the Basin, averaging 75 degrees Fahrenheit (°F).
However, with a less pronounced oceanic influence, the eastern inland portions of the Basin show greater variability in annual minimum and maximum temperatures. All portions of the Basin have had recorded temperatures over 100°F in recent years.
Although the Basin has a semi-arid climate, the air near the surface is moist due to the presence of a shallow marine layer. Except for infrequent periods when dry, continental air is brought into the Basin by offshore winds, the ocean effect is dominant. Periods with heavy fog are frequent, and low stratus clouds, occasionally referred to as “high fog,” are a characteristic climate feature. Annual average relative humidity is 70 percent at the coast and 57 percent in the eastern part of the Basin. Precipitation in the Basin is typically nine to 14 inches annually and is rarely in the form of snow or hail due to typically warm weather. The frequency and amount of rainfall is greater in the coastal areas of the Basin.
The height of the inversion is important in determining pollutant concentration. An inversion is an increase of temperature with height. When the inversion is approximately 2,500 feet above sea level, the sea breezes carry the pollutants inland to escape over the mountain slopes or through the passes. At a height of 1,200 feet, the terrain prevents the pollutants from entering the upper atmosphere, resulting in a settlement in the foothill communities. Below 1,200 feet, the inversion puts a tight lid on pollutants, concentrating them in a shallow layer over the entire coastal basin. Usually, inversions are lower before sunrise than during the day. Mixing heights for inversions are lower in the summer and more persistent, being partly responsible for the high levels of O3 observed during summer months in the Basin. Smog in southern California is generally the result of these temperature inversions combining with coastal day winds and local mountains to contain the pollutants for long periods of time, allowing them to form secondary pollutants by reacting with sunlight. The Basin has a limited ability to disperse these pollutants due to typically low wind speeds.
The area in which the project is located offers clear skies and sunshine yet is still susceptible to air inversions. These inversions trap a layer of stagnant air near the ground, where it is then further loaded with pollutants. These inversions cause haziness, which is caused by moisture, suspended dust, and a variety of chemical aerosols emitted by trucks, automobiles, furnaces, and other sources.
The project area experiences average high temperatures of up to 75°F during the month of August, and average low temperatures of 50°F during the month of December. The area also experiences an average of up to approximately 3.4 inches of precipitation per month, with the most precipitation occurring in the month of February.
4 Local Ambient Air Quality
CARB monitors ambient air quality at approximately 250 air monitoring stations across the State. Air quality monitoring stations usually measure pollutant concentrations ten feet above ground level; therefore, air quality is often referred to in terms of ground-level concentrations. The project site is located within Source Receptor Area (SRA) 2, Northwest Los Angeles County Coastal. The closest air 4 Weather Spark, Average Weather in Los Angeles, California, United States, https://weatherspark.com/y/145341/Average‐Weather‐at‐Los‐Angeles‐International‐Airport‐California‐United‐States‐Year‐ Round, accessed July 8, 2024.
Oakhurst Apartments Project 10
Air Quality Assessment
monitoring station to the project site that monitors O3, CO, and NO2 is the West Los Angeles-VA Hospital Monitoring Station located at Wilshire Boulevard and Sawtelle, Los Angeles CA 90025. The closest air monitoring station to the project site that monitors PM10 and PM2.5 is the Los Angeles-North Main Street Monitoring Station located at 1630 North Main Street, Los Angeles CA 90012. Local air quality data from 2020 to 2022 is provided in Table 1, Summary of Air Quality Data. Table 1 lists the monitored maximum concentrations and number of exceedances of federal/state air quality standards for each year.
Table 1
Measured Air Quality Level
Pollutant
Primary Standard
Year Maximum
Concentration1
Number of Days
State/Federal
Std. Exceeded California Federal
Ozone (O3)2
(1-hour)
0.09 ppm
for 1 hour NA6
2020
2021
2022
0.134 ppm
0.095 ppm
0.081 ppm
6/1
1/1
0/0
Ozone (O3)2
(8-hour)
0.070 ppm
for 8 hours
0.070 ppm
for 8 hours
2020
2021
2022
0.093 ppm
0.083 ppm
0.070 ppm
8/8
1/1
0/0
Carbon Monoxide
(CO)2,3 (1-hour)
20 ppm
for 1 hour
35 ppm
for 1 hour
2020
2021
2022
2.002 ppm
1.532 ppm
1.672 ppm
0/0
0/0
0/0
Nitrogen Dioxide
(NO2)1
0.18 ppm
for 1 hour
0.100 ppm
for 1 hour
2020
2021
2022
0.077 ppm
0.061 ppm
0.051 ppm
0/0
0/0
0/0
Fine Particulate
Matter
(PM2.5)3, 4
No Separate
Standard
35 µg/m3
for 24 hours
2020
2021
2022
175.0 µg/m3
61.1 µg/m3
38.0 µg/m3
NA/12
NA/13
NA/ 0
Coarse Particulate
Matter
(PM10)3, 4, 5
50 µg/m3
for 24 hours
150 µg/m3
for 24 hours7
2020
2021
2022
185.2 µg/m3
138.5 µg/m3
43.7 µg/m3
34/0
14/0
0/0
ppm = parts per million PM10 = particulate matter 10 microns in diameter or less µg/m3 = micrograms per cubic meter PM2.5 = particulate matter 2.5 microns in diameter or less N/A = Not Applicable
Notes:
1. Maximum concentration is measured over the same period as the California Standards.
2. Data collected from the West Los Angeles-VA Hospital Monitoring Station located at Wilshire Boulevard and Sawtelle, Los Angeles, CA 90025.
3. Data collected from the Los Angeles-North Main Street Monitoring Station located at 1630 North Main Street, Los Angeles, CA 90012.
4. PM10 and PM2.5 exceedances are derived from the number of samples exceeded, not days.
5. PM10 exceedances are based on State thresholds established prior to amendments adopted on June 20, 2002.
6. The Federal standard for 1-hour ozone was revoked in June 2005.
7. The Federal standard for average PM10 was revoked in December 2006.
Sources:
California Air Resources Board, ADAM Air Quality Data Statistics, http://www.arb.ca.gov/adam/, accessed July 8, 2024.
California Air Resources Board, AQMIS2: Air Quality Data, https://www.arb.ca.gov/aqmis2/aqdselect.php, accessed July 8, 2024.
Sensitive Receptors
Sensitive receptors are defined as facilities or land uses that include members of the population that are particularly sensitive to the effects of air pollutants, such as children, the elderly, and people with illnesses.
Examples of these sensitive receptors are residences, schools, hospitals, and daycare centers. CARB has identified the following groups of individuals as the most likely to be affected by air pollution: the elderly Oakhurst Apartments Project 11
Air Quality Assessment
over 65, children under 14, athletes, and persons with cardiovascular and chronic respiratory diseases such as asthma, emphysema, and bronchitis.
The nearest sensitive receptors to the project site are the existing multi-family residential uses located 15 feet to the north and south, and multi-family residential uses located approximately 25 feet to the east.
REGULATORY SETTING
Federal
Federal Clean Air Act
The FCAA of 1970 and the FCAA Amendments of 1971 required the EPA to establish NAAQS, which required the EPA to adopt more stringent air quality standards or to include standards for other specific pollutants. The FCAA was amended in 1990 to address a large number of air pollutants that are known to cause or may reasonably be anticipated to cause adverse effects to human health or adverse environmental effects. A total of 188 specific pollutants and chemical groups were initially identified as hazardous air pollutants, and the list has been modified over time. The FCAA Amendments included new regulatory programs to control acid deposition and regulate the issuance of stationary source operating permits. These standards identify levels of air quality for “criteria” pollutants that are considered the maximum levels of ambient (background) air pollutants considered safe, with an adequate margin of safety, to protect the public health and welfare; refer to Table 2, National and California Ambient Air Quality Standards.
State
California Clean Air Act
Clean Air Act permitting in California is the shared responsibility of the CARB, its 35 air pollution control agencies (districts), and EPA Region 9. Generally, CARB plays an oversight role for permitting and does not issue any pre-construction or operating permits. However, the State agency provides significant support to agencies that need permitting assistance.
California Air Resource Board
CARB administers the air quality policy in California. The CAAQS were established in 1969 pursuant to the Mulford-Carrell Act. These standards, shown with the NAAQS in Table 2, are generally more stringent and apply to more pollutants than the NAAQS. In addition to the criteria pollutants, CAAQS have been established for visibility reducing particulates, hydrogen sulfide, and sulfates. The California Clean Air Act (CCAA), which was approved in 1988, requires that each local air district prepare and maintain an Air Quality Management Plan (AQMP) to achieve compliance with the CAAQS. These AQMPs also serve as the basis for the preparation of the State Implementation Plan (SIP) for the State of California.
Like the EPA, CARB also designates areas within California as either attainment or non-attainment for each criteria pollutant based on whether the CAAQS have been achieved. Under the CCAA, areas are designated as non-attainment for a pollutant if air quality data show that a State standard for the pollutant was violated at least once during the previous three calendar years. Exceedances that are affected by highly Oakhurst Apartments Project 12
Air Quality Assessment
irregular or infrequent events are not considered violations of a State standard and are not used as a basis for designating areas as non-attainment.
Table 2
National and California Ambient Air Quality Standards
Pollutant Averaging Time
California1 Federal2
Standard3 Attainment Status Standards3,4 Attainment Status Ozone (O3) 1 Hour 0.09 ppm (180 µg/m3) Nonattainment N/A N/A5 8 Hours 0.070 ppm (137 µg/m3) Nonattainment 0.070 ppm (137 µg/m3) Nonattainment Particulate
Matter (PM10)
24 Hours 50 µg/m3 Nonattainment 150 µg/m3 Attainment/Maintenance Annual Arithmetic
Mean 20 µg/m3 Nonattainment N/A N/A
Fine Particulate
Matter
(PM2.5)
24 Hours No Separate State Standard 35 µg/m3 Nonattainment Annual Arithmetic
Mean 12 µg/m3 Nonattainment 12.0 µg/m3 Nonattainment
Carbon
Monoxide (CO)
8 Hours 9.0 ppm (10 mg/m3) Attainment 9 ppm (10 mg/m3) Attainment/Maintenance 1 Hour 20 ppm (23 mg/m3) Attainment 35 ppm (40 mg/m3) Attainment/Maintenance Nitrogen Dioxide
(NO2)5
Annual Arithmetic
Mean 0.030 ppm (57 µg/m3) N/A 53 ppb (100 µg/m3) Attainment/Maintenance 1 Hour 0.18 ppm (339 µg/m3) Attainment 100 ppb (188 µg/m3) Attainment/Maintenance Lead (Pb)7,8
30 days Average 1.5 µg/m3 Attainment N/A N/A
Calendar Quarter N/A N/A 1.5 µg/m3 Nonattainment
Rolling 3-Month
Average N/A N/A 0.15 µg/m3 Nonattainment
Sulfur Dioxide
(SO2)
6 24 Hours 0.04 ppm (105 µg/m3) Attainment 0.14 ppm
(for certain areas) Unclassified/Attainment
3 Hours N/A N/A N/A N/A
1 Hour 0.25 ppm (655 µg/m3) Attainment 75 ppb (196 µg/m3) N/A Annual Arithmetic
Mean N/A N/A 0.30 ppm
(for certain areas) Unclassified/Attainment
VisibilityReducing
Particles9
8 Hours (10 a.m. to
6 p.m., PST)
Extinction coefficient =
0.23 km@<70% RH Unclassified
No
Federal
Standards Sulfates 24 Hour 25 µg/m3 Attainment
Hydrogen Sulfide 1 Hour 0.03 ppm (42 µg/m3) Unclassified Vinyl Chloride7 24 Hour 0.01 ppm (26 µg/m3) N/A
Notes: µg/m3 = micrograms per cubic meter; ppm = parts per million; ppb = parts per billion; km = kilometer(s); RH = relative humidity; PST = Pacific Standard Time; N/A = Not Applicable
1. California standards for ozone, carbon monoxide (except 8-hour Lake Tahoe), sulfur dioxide (1- and 24-hour), nitrogen dioxide, and particulate matter (PM10, PM2.5, and visibility reducing particles), are values that are not to be exceeded. All others are not to be equaled or exceeded. California ambient air quality standards are listed in the Table of Standards in Section 70200 of Title 17 of the California Code of Regulations.
2. National standards (other than ozone, particulate matter, and those based on annual arithmetic mean) are not to be exceeded more than once a year. The ozone standard is attained when the fourth highest 8-hour concentration measured at each site in a year, averaged over three years, is equal to or less than the standard. For PM10, the 24-hour standard is attained when the expected number of days per calendar year with a 24-hour average concentration above 150 μg/m3 is equal to or less than one. For PM2.5, the 24-hour standard is attained when 98 percent of the daily concentrations, averaged over three years, are equal to or less than the standard.
3. Concentration expressed first in units in which it was promulgated. Equivalent units given in parentheses are based upon a reference temperature of 25°C and a reference pressure of 760 torr. Most measurements of air quality are to be corrected to a reference temperature of 25°C and a reference pressure of 760 torr; ppm in this table refers to ppm by volume, or micromoles of pollutant per mole of gas.
4. National Primary Standards: The levels of air quality necessary, with an adequate margin of safety, to protect the public health.
5. To attain the 1-hour national standard, the 3-year average of the annual 98th percentile of the 1-hour daily maximum concentrations at each site must not exceed 100 ppb. Note that the national 1-hour standard is in units of parts per billion (ppb). California standards are in units of parts per million (ppm). To directly compare the national 1-hour standard to the California standards the units can be converted from ppb to ppm. In this case, the national standard of 100 ppb is identical to 0.100 ppm.
6. On June 2, 2010, a new 1-hour SO2 standard was established, and the existing 24-hour and annual primary standards were revoked. To attain the 1-hour national standard, the 3-year average of the annual 99th percentile of the 1-hour daily maximum concentrations at each site must not exceed 75 ppb. The 1971 SO2 national standards (24-hour and annual) remain in effect until one year after an area is designated for the 2010 standard, except that in areas designated nonattainment for the 1971 standards, the 1971 standards remain in effect until implementation plans to attain or maintain the 2010 standards are approved. Note that the 1-hour national standard is in units of ppb. California standards are in units of parts per million (ppm). To directly compare the 1-hour national standard to the California standard the units can be converted to ppm. In this case, the national standard of 75 ppb is identical to 0.075 ppm.
7. CARB has identified lead and vinyl chloride as ‘toxic air contaminants’ with no threshold level of exposure for adverse health effects determined. These actions allow for the implementation of control measures at levels below the ambient concentrations specified for these pollutants.
8. The national standard for lead was revised on October 15, 2008, to a rolling 3-month average. The 1978 lead standard (1.5 μg/m3 as a quarterly average) remains in effect until one year after an area is designated for the 2008 standard, except that in areas designated nonattainment for the 1978 standard, the 1978 standard remains in effect until implementation plans to attain or maintain the 2008 standard are approved.
9. In 1989, CARB converted both the general statewide 10-mile visibility standard and the Lake Tahoe 30-mile visibility standard to instrumental equivalents, which are “extinction of 0.23 per kilometer” and “extinction of 0.07 per kilometer” for the statewide and Lake Tahoe Air Basin standards, respectively.
Source: California Air Resources Board, Ambient Air Quality Standards Chart, http://www.arb.ca.gov/research/aaqs/aaqs2.pdf, May 4, 2016.
Oakhurst Apartments Project 13
Air Quality Assessment
Regional
South Coast Air Quality Management District
The SCAQMD is one of California’s 35 air quality management districts that have prepared AQMPs to accomplish a five-percent annual reduction in air emissions. SCAQMD adopted the 2022 AQMP on December 2, 2022. The primary purpose of the 2022 AQMP is to identify, develop, and implement strategies and control measures to meet the 2015 eight-hour ozone NAAQS – 70 parts per billion (ppb) as expeditiously as practicable, but no later than the statutory attainment deadline of August 3, 2038, for the Basin and August 3, 2033, for the Riverside County portion of the Salton Sea Air Basin. The 2022 AQMP incorporates the recently adopted Southern California Association of Governments’ (SCAG) 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy (2020-2045 RTP/SCS) and motor vehicle emissions from CARB. The 2022 AQMP relies on a multi-level partnership of governmental agencies at the Federal, State, regional, and local level. These agencies (EPA, CARB, local governments, SCAG, and the SCAQMD) are the primary agencies that implement the AQMP programs.
Southern California Association of Governments
On September 3, 2020, the Regional Council of SCAG formally adopted the 2020-2045 RTP/SCS. The SCS portion of the 2020-2045 RTP/SCS highlights strategies for the region to reach the regional target of reducing greenhouse gases (GHGs) from autos and light-duty trucks by 8 percent per capita by 2020, and 19 percent by 2035 (compared to 2005 levels). Specially, these strategies are:
• Focus growth near destinations and mobility options;
• Promote diverse housing choices;
• Leverage technology innovations;
• Support implementation of sustainability policies; and • Promote a green region.
Furthermore, the 2020-2045 RTP/SCS discusses a variety of land use tools to help achieve the statemandated reductions in GHG emissions through reduced per capita VMT. Some of these tools include center-focused placemaking, focusing on priority growth areas, job centers, transit priority areas, as well as high quality transit areas and green regions.
The latest 2024-2050 RTP/SCS (Connect SoCal 2024) was adopted on April 4, 2024. Connect SoCal 2024 is a vision for the future of Southern California that includes policies, strategies, and projects to advance the region's mobility, economy, and sustainability through 2050. While SCAG recently adopted the Connect SoCal 2024, the SCAQMD has not released an updated AQMP. As such, this memorandum is based off the 2022 AQMP and the RTP/SCS that was adopted at the time, the 2020-2045 RTP/SCS.
Air Pollutant Emissions Thresholds
Under CEQA, the SCAQMD is an expert agency on air quality within its jurisdiction or impacting its jurisdiction. Under the FCAA, the SCAQMD has adopted Federal attainment plans for O3 and PM10. The SCAQMD reviews projects to ensure they do not: (1) cause or contribute to any new violation of any air quality standard; (2) increase the frequency or severity of any existing violation of any air quality standard; Oakhurst Apartments Project 14
Air Quality Assessment
or (3) delay timely attainment of any air quality standard or any required interim emission reductions or other milestones of any Federal attainment plan.
The CEQA Air Quality Handbook also provides significance thresholds for both construction and operation of projects within the SCAQMD’s jurisdiction. If the SCAQMD thresholds are exceeded, a potentially significant impact could result. However, ultimately the lead agency determines the thresholds of significance for impacts. If a project proposes development in excess of the established thresholds, as outlined in Table 3, South Coast Air Quality Management District Emissions Thresholds, a significant air quality impact may occur, and additional analysis is warranted to fully assess the significance of impacts.
Table 3
South Coast Air Quality Management District Emissions Thresholds Phase Pollutant (pounds per day)
ROG NOX CO SOX PM10 PM2.5
Construction 75 100 550 150 150 55
Operational 55 55 550 150 150 55
Notes: ROG = reactive organic gases; NOX = nitrous oxides; CO = carbon monoxide; SOX = sulfur oxides; PM10 = particulate matter 10 microns in diameter or less; PM2.5 = particulate matter 2.5 microns in diameter or less Source: South Coast Air Quality Management District, South Coast AQMD Air Quality Significance Thresholds, April 2019.
Local Carbon Monoxide Standards
A project would result in a local air quality impact if the project results in increased traffic volumes and/or decreases in level of service (LOS) that would result in an exceedance of the CO ambient air quality standards of 20 parts per million (ppm) for 1-hour CO concentration levels, and 9 ppm for 8-hour CO concentration levels. If the CO concentrations at potentially impacted intersections with the project are lower than the standards, then there is no significant impact. If future CO concentrations with the project are above the standard, then the project would have a significant local air quality impact.
Localized Significance Thresholds
Localized significance thresholds (LSTs) were developed in response to SCAQMD Governing Boards’ Environmental Justice Enhancement Initiative (I-4). The SCAQMD provided the Final Localized Significance Threshold Methodology (dated July 2008) for guidance. The LST methodology assists lead agencies in analyzing localized impacts associated with site-specific projects. The SCAQMD provides the LST lookup tables for one-, two-, and five-acre projects emitting CO, NOX, PM2.5, or PM10. The LST methodology and associated mass rates are not designed to evaluate localized impacts from mobile sources traveling over the roadways. The SCAQMD recommends that any project over five acres should perform air quality dispersion modeling to assess impacts to nearby sensitive receptors.
Oakhurst Apartments Project 15
Air Quality Assessment
Local
City of Beverly Hills
Beverly Hills Sustainable City Plan
The Climate Change and Air Quality Element of the Beverly Hills Sustainable City Plan (SCP)5 includes goals and polices related to air quality. The following goal, objective, and policies are applicable to the proposed project:
Climate Change and Air Quality Element
Goal 2: Combat climate change and improve air quality.
Objective 2: Reduce and encourage the reduction of air emissions in City operations and Citywide.
Policy 2.2: Minimize mobile source emissions from on- and off-road (construction) vehicles.
Policy 2.3: Minimize stationary source air emissions.
Policy 2.4: Minimize particulate matter, both airborne photochemical precipitates and windborne dust.
City of Los Angeles
City of Los Angeles General Plan
The Air Quality Element of the City of Los Angeles General Plan6 includes goals and polices related to air quality. The following goals, objectives, and policies are applicable to the proposed project:
Air Quality Element
Goal 1: Good air quality and mobility in an environment of continued population growth and healthy economic structure.
Objective 1.1: It is the objective of the City of Los Angeles to reduce air pollutants consistent with the Regional Air Quality Management Plan (AQMP), increase traffic mobility, and sustain economic growth citywide.
Policy 1.1.1: Encourage demonstration projects which involve creative and innovative uses of market incentive mechanisms to achieve air quality objectives.
5 City of Beverly Hills, Beverly Hills Sustainable City Plan¸ February 17, 2009, http://www.beverlyhills.org/cbhfiles/storage/files/24347783778629768/SustainableCityPlan.pdf, accessed July 8, 2024. 6 City of Los Angeles, Air Quality Element¸ Adopted November 24, 1992, https://planning.lacity.gov/odocument/0ff9a9b0- 0adf-49b4-8e07-0c16feea70bc/Air_Quality_Element.pdf, accessed July 8, 2024.
Oakhurst Apartments Project 16
Air Quality Assessment
Objective 1.3: It is the objective of the City of Los Angeles to reduce particulate air pollutants emanating from unpaved roads, parking lots, and construction sites.
Policy 1.3.1: Minimize particulate emissions from construction sites.
Policy 1.3.2: Minimize particulate emissions from unpaved roads and parking lots which are associated with vehicular traffic.
Goal 2: Less reliance on single-occupant vehicles with fewer commute and non-work trips.
Objective 2.2: It is the objective of the City of Los Angeles to increase vehicle occupancy for non-work trips by creating disincentives for single passenger vehicles, and incentives for high occupancy vehicles.
Policy 2.2.1: Discourage single-occupant vehicle use through a variety of measures such as market incentive strategies, mode-shift incentives, trip reduction plans and ridesharing subsidies.
Policy 2.2.2: Encourage multi-occupant vehicle travel and discourage single-occupant vehicle travel by instituting parking management practices.
Goal 4: Minimal impact of existing land use patterns and future land use development on air quality by addressing the relationship between land use, transportation, and air quality.
Objective 4.2: It is the objective of the City of Los Angeles to reduce vehicle trips and vehicle miles traveled associated with land use patterns.
Policy 4.2.3: Ensure that new development is compatible with pedestrians, bicycles, transit, and alternative fuel vehicles.
Policy 4.2.4: Require that air quality impacts be a consideration in the review and approval of all discretionary projects.
Policy 4.2.5: Emphasize trip reduction, alternative transit and congestion management measures for discretionary projects.
Goal 5: Energy efficiency through land use and transportation planning, the use of renewable resources and less polluting fuels, and the implementation of conservation measures including passive methods such as site orientation and tree planting.
Objective 5.1: It is the objective of the City of Los Angeles to increase energy efficiency of City facilities and private developments.
Policy 5.1.2: Effect a reduction in energy consumption and shift to non-polluting sources of energy in its buildings and operations.
Policy 5.1.4: Reduce energy consumption and associated air emissions by encouraging waste reduction and recycling.
Oakhurst Apartments Project 17
Air Quality Assessment
CALIFORNIA ENVIRONMENTAL QUALITY ACT THRESHOLDS
In accordance with the California Environmental Quality Act Guidelines(CEQA Guidelines), project impacts are evaluated to determine whether significant adverse environmental impacts would occur. This analysis will focus on the project’s potential impacts and provide mitigation measures, if required, to reduce or avoid any potentially significant impacts that are identified. According to Appendix G of the CEQA Guidelines, the proposed project would have a significant impact related to air quality if it would:
• Conflict with or obstruct implementation of the applicable air quality plan (refer to Impact Statement AQ-1);
• Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable Federal or State ambient air quality standard (refer to Impact Statement AQ-2);
• Expose sensitive receptors to substantial pollutant concentrations (refer to Impact Statement AQ-3); and/or
• Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people (refer to Impact Statement AQ-4).
Methodology
Construction
Project construction would primarily generate temporary criteria pollutants from construction equipment operation on-site and construction worker vehicle trips to and from the project site, and from construction material deliveries to and from the project site. Construction input data for CalEEMod include, but are not limited to, (1) the anticipated start and finish dates of construction activity; (2) inventories of construction equipment to be used; and (3) areas to be excavated and graded. Construction emissions were quantified by estimating the types and quantity of equipment that would be used on-site during each construction phase, as provided by the model defaults. CalEEMod also estimates off-site emissions from worker, vendor, and hauling truck trips.
Construction of the proposed project is anticipated to take approximately 32 months to complete. The construction activities would include demolition, grading, building construction, and architectural coating.
The number of worker and vendor trips were based on CalEEMod defaults, and the hauling truck trips were generally based on the soil export volumes provided by the project Applicant and the building area of the existing building to be demolished; approximately 19,000 cubic yards of soil export is required for this project and the existing building to be demolished is approximately 32,400 square feet. The default trip lengths were used for worker, vendor, and hauling truck trips.
Operation
Operational sources of criteria pollutant emissions include area, energy, and mobile sources, which are further discussed below. CalEEMod modeling was conducted for the proposed project condition. As a conservative analysis, emissions from existing uses on-site were not modeled or deducted from project emissions.
Oakhurst Apartments Project 18
Air Quality Assessment
Area Sources
Emissions associated with area sources include consumer products, landscape maintenance, and architectural coating. Area source emissions were calculated using standard emission rates from CARB, USEPA, SCAQMD, and CalEEMod model defaults.
Energy Sources
The project would be served by Los Angeles Department of Water and Power (LADWP). The primary use of electricity by the project would be for space heating and cooling, water heating, ventilation, lighting, appliances, landscaping equipment, and electronics. Emissions from energy sources are primarily generated by natural gas use. The emissions factors for natural gas combustion are based on EPA’s AP-42 (Compilation of Air Pollutant Emissions Factors). Emissions from electricity use are not included in the air quality analysis as they only apply to greenhouse gas emissions since electricity generation is an indirect emission generated off-site and, therefore, not relevant for local and regional air quality conditions.
Mobile Sources
Mobile source emissions are estimated by multiplying the project’s total vehicle miles traveled (VMT) by the vehicle emission factors. The vehicle emission factors were CalEEMod default values for the Los Angeles County. The project-specific VMT were calculated from project trip generation rates and CalEEMod default trip lengths. According to CalEEMod default values, the project would result in approximately 283 daily trips during weekdays, 255 trips on Saturdays, and 213 trips on Sundays.
IMPACT ANALYSIS
AQ-1 WOULD THE PROJECT CONFLICT WITH OR OBSTRUCT IMPLEMENTATION OF THE APPLICABLE AIR QUALITY PLAN?
Level of Significance: Less Than Significant Impact.
The project is located within the South Coast Air Basin, which is governed by the SCAQMD. On December 2, 2022, the SCAQMD Governing Board adopted the 2022 AQMP. The 2022 AQMP incorporates the latest scientific and technical information and planning assumptions, including the latest applicable growth assumptions, updated emission inventory methodologies for various source categories. Additionally, the 2022 AQMP utilized information and data from SCAG and its 2020-2045 RTP/SCS. While SCAG has recently adopted Connect SoCal 2024, SCAQMD has not released an updated AQMP. As such, this consistency analysis is based off the 2022 AQMP and the RTP/SCS that was adopted at the time, the 2020-2045 RTP/SCS. According to the SCAQMD’s CEQA Air Quality Handbook, projects must be analysed for consistency with two main criteria, as discussed below.
Criterion 1:
With respect to the first criterion, SCAQMD methodologies require that an air quality analysis for a project include forecasts of project emissions in relation to contributing to air quality violations and delay of attainment.
Oakhurst Apartments Project 19
Air Quality Assessment
a) Would the project result in an increase in the frequency or severity of existing air quality violations? Since the consistency criteria identified under the first criterion pertain to pollutant concentrations, rather than to total regional emissions, an analysis of a project’s pollutant emissions relative to localized pollutant concentrations associated with the CAAQS and NAAQS is used as the basis for evaluating project consistency. As discussed under Impact Statements AQ-2 and AQ-3, the project’s short-term construction emissions, long-term operational emissions, and localized concentrations of CO, NOX, PM10, and PM2.5 would be less than significant. Due to the role VOC plays in O3 formation, it is classified as a precursor pollutant and only a regional emissions threshold has been established. As such, the project would not cause or contribute to localized air quality violations or delay the attainment of air quality standard or interim emissions reductions specified in the AQMP.
b) Would the project cause or contribute to new air quality violations? As discussed in Impact Statements AQ-2 and AQ-3, construction and operation of the proposed project would result in emissions that would be below the SCAQMD construction and operational thresholds. Therefore, the proposed project would not have the potential to cause or contribute to a violation of the ambient air quality standards.
c) Would the project delay timely attainment of air quality standards or the interim emissions reductions specified in the AQMP?
As discussed in Impact Statement AQ-3, the proposed project would result in less than significant impacts regarding localized concentrations during project construction and operations. As such, the proposed project would not delay the timely attainment of air quality standards or 2022 AQMP emissions reductions.
Criterion 2:
With respect to the second criterion for determining consistency with SCAQMD and SCAG air quality policies, it is important to recognize that air quality planning within the Basin focuses on attainment of ambient air quality standards at the earliest feasible date. Projections for achieving air quality goals are based on assumptions regarding population, housing, and growth trends. Thus, the SCAQMD’s second criterion for determining project consistency focuses on whether the project exceeds the assumptions utilized in preparing the forecasts presented in the 2022 AQMP. Determining whether a project exceeds the assumptions reflected in the 2022 AQMP involves the evaluation of the following criteria. a) Would the project be consistent with the population, housing, and employment growth projections utilized in the preparation of the AQMP?
A project is consistent with the 2022 AQMP if it is consistent with the population, housing, and employment assumptions that were used in the development of the 2022 AQMP. In the case of the 2022 AQMP, foursources of data form the basis for the projections of air pollutant emissions:
the City of Beverly Hills General Plan, the City of Los Angeles General Plan, SCAG’s regional growth forecast, and the SCAG 2020-2045 RTP/SCS. The 2020-2045 RTP/SCS also provides socioeconomic forecast projections of regional population growth.
Oakhurst Apartments Project 20
Air Quality Assessment
The project site is zoned Multiple Residential Zone (R-4), and the Beverly Hills General Plan Land Use Map and Los Angeles General Plan Land Use Map currently designate the project site as MultiFamily Residential, High Density (within the portion of the lot located in the City of Beverly Hills) and High Medium Residential (within the portion of the lot located in the City of Los Angeles). The on-site designations allow for a maximum density of 50 du/acre on the portion of the lot located in the City of Beverly Hills and between 55 and 109 du/acre on the portion of the lot located in the City of Los Angeles. Additionally, the portion of the lot located in the City of Beverly Hills allows for a 60-foot maximum building height, and the portion of the lot located in the City of Los Angeles does not designate a maximum building height. The proposed project would involve demolishing the existing residential building and constructing a 52-unit (12 residential units within the portion of the lot located in the City of Beverly Hills and 40 units within the portion of the lot located in the City of Los Angeles) residential building with common open space amenities and two levels of basement parking on an approximately 0.35-acre (0.10-acre within the portion of the lot located in Beverly Hills and 0.25-acre within the portion of the lot located in Los Angeles on) site. As such, the project would result in an overall density of 149 du/acre. The proposed building would be constructed up to a height of eight stories (or 86 feet, 11 inches), including rooftop appurtenances.
The project would seek a Density Bonus Permit within the City of Beverly Hills to allow a 50 percent density bonus for projects that include an amount of very low income units equal to 15 percent of the total base density (pursuant to California Government Code Section 65915[f][2]); and an additional 38.75 percent density bonus for projects that include an amount of very low income units equal to 10 percent of the total base density (pursuant to California Government Code Section 65915[v][2]). Within the City of Los Angeles, the project Applicant requests a 50 percent density bonus for projects that include an amount of very low income units equal to 15 percent of the total base density (pursuant to California Government Code Section 65915[f][2]).
Within the City of Beverly Hills, the proposed project would include two very low-income units; one low income unit; and nine market-rate units. With the approval of the requested waiver and Density Bonus Permit, the project would be consistent with the General Plan and Zoning Map requirements.
The population estimate as of January 1, 2024, is 31,806 persons in Beverly Hills and 3,814,318 persons in Los Angeles.
7 The project would induce population growth directly through the construction of 52 residential units. Based on CalEEMod default value, the project would result in a direct population increase of approximately 154 persons. Based on the population forecast provided in the 2020-2045 RTP/SCS, Beverly Hills and Los Angeles are estimated to have approximately 35,800 residents and 4,771,300 residents, respectively, by 2045 (the 2020-2045 RTP/SCS horizon year).8 Therefore, between 2024 and 2045, Beverly Hills and Los Angeles are expected to have an estimate population growth of 3,994 residents and 956,982 residents, respectively. The project’s 154 residents would represent approximately 3.9 percent or 0.02 percent of the anticipated growth in Beverly Hills and Los Angeles, respectively. Thus, the project would be consistent with the projections in the 2020-2045 RTP/SCS. It should be noted that the 7 California Department of Finance, Population and Housing Estimates for Cities, Counties, and the State, January 2021- 2024, with 2020 Benchmark, https://dof.ca.gov/forecasting/demographics/estimates/e-5-population-and-housing-estimatesfor-cities-counties-and-the-state-2020-2024/, accessed July 9, 2024. 8 Southern California Association of Governments, Connect SoCal 2020, Demographics and Growth Forecast, https://scag.ca.gov/sites/main/files/file-attachments/0903fconnectsocal_demographics-and-growth-forecast.pdf?1606001579, accessed July 9, 2024.
Oakhurst Apartments Project 21
Air Quality Assessment
analysis above is a conservative analysis as the project’s estimated population growth of 154 persons does not take into account the existing residents on the project site. Since SCAQMD has incorporated the 2020-2045 RTP/SCS projections into the 2022 AQMP, it can be concluded that the project would also be consistent with the 2022 AQMP.
Therefore, the project is consistent with the types, intensity, and patterns of land use envisioned for the site vicinity and would be considered consistent with the General Plans upon the approvals on the required waivers and permits. Further, the population, and housing, which are adopted by SCAG’s Regional Council, are based on the local plans and policies applicable to Beverly Hills and Los Angeles. As the SCAQMD has incorporated these same projections into the 2022 AQMP, it can be concluded that the proposed project would be consistent with the projections. b) Would the project implement all feasible air quality mitigation measures? The proposed project would not require mitigation and would result in less than significant air quality impacts; refer to Impact Statements AQ-2 and AQ-3. In addition, the project would comply with all applicable SCAQMD rules and regulations, including Rule 403 that requires control of excessive fugitive dust emissions by regular watering or other dust prevention measures, and Rule 1113 that regulates the ROG content of paint. As such, the proposed project meets this AQMP consistency criterion.
c) Would the project be consistent with the land use planning strategies set forth in the AQMP? Land use planning strategies set forth in the 2022 AQMP are primarily based on the 2020-2045 RTP/SCS. The project is located less than 0.3-mile from multiple bus stops located along Santa Monica Boulevard and Burton Way operated by Los Angeles Metro. Further, the project would provide electric vehicle (EV) charging stations and bicycle parking on-site to promote alternative transportation options. Therefore, the project would be consistent with the actions and strategies of the 2020-2045 RTP/SCS to reduce VMT and related mobile source emissions.
In conclusion, the determination of 2022 AQMP consistency is primarily concerned with the long-term influence of a project on air quality in the Basin. The proposed project would not result in a long-term impact on the region’s ability to meet State and Federal air quality. Also, the proposed project would be consistent with the goals and policies of the 2022 AQMP for control of fugitive dust. As discussed above, the proposed project’s long-term influence would also be consistent with the SCAQMD and SCAG’s goals and policies and is, therefore, considered consistent with the 2022 AQMP.
Mitigation Measures: No mitigation is required.
AQ-2 WOULD THE PROJECT RESULT IN A CUMULATIVELY CONSIDERABLE NET INCREASE OF ANY
CRITERIA POLLUTANT FOR WHICH THE PROJECT REGION IS NON-ATTAINMENT UNDER AN APPLICABLE FEDERAL OR STATE AMBIENT AIR QUALITY STANDARD? Level of Significance: Less Than Significant Impact.
Oakhurst Apartments Project 22
Air Quality Assessment
Construction
Refer to Appendix A, Air Quality Emissions Data for the detailed CalEEMod output. Table 4, Maximum Daily Construction Emissions summarizes the estimated maximum daily emissions of VOC (ROG), NOx, CO, SO2, PM10, and PM2.5.
Table 4
Maximum Daily Construction Emissions
Scenario Pollutant (pounds/day) 1,2
ROG NOX CO SO2 PM10 PM2.5
Year 1 (2025) Construction Emissions 1.13 11.3 10.9 0.02 2.21 1.20 Year 2 (2026) Construction Emissions 1.35 10.5 16.1 0.02 2.16 1.16 Year 3 (2027) Construction Emissions 1.29 10.2 15.9 0.02 1.04 0.46 Year 4 (2028) Construction Emissions 8.09 9.77 15.2 0.02 1.01 0.42 Maximum Daily Emissions 8.09 11.3 16.1 0.02 2.21 1.20
SCAQMD Significance Thresholds 75 100 550 150 150 55
Threshold Exceeded? No No No No No No
Notes:
1. Emissions were calculated using CalEEMod version 2022.1. Higher emissions between winter and summer are presented as a conservative analysis.
2. Modeling assumptions include compliance with SCAQMD Rule 403 which requires: properly maintain mobile and other construction equipment; replace ground cover in disturbed areas quickly; water exposed surfaces three times daily; cover stockpiles with tarps; water all haul roads twice daily; and limit speeds on unpaved roads to 15 miles per hour.
Source: Refer to Appendix A for assumptions used in this analysis.
Fugitive Dust Emissions
Construction activities are a source of fugitive dust emissions that may have a substantial, temporary impact on local air quality. In addition, fugitive dust may be a nuisance to those living and working in the project area. Fugitive dust emissions are associated with land clearing, ground excavation, cut-and-fill, and truck travel on unpaved roadways. Fugitive dust emissions vary substantially from day to day, depending on the level of activity, specific operations, and weather conditions. Fugitive dust from demolition, site preparation, and construction is expected to be short-term and would cease upon project completion. It should be noted that most of this material is inert silicates, rather than the complex organic particulates released from combustion sources, which are more harmful to health.
Dust (larger than 10 microns) generated by such activities usually becomes more of a local nuisance than a serious health problem. Of particular health concern is the amount of PM10 generated as a part of fugitive dust emissions. PM10 poses a serious health hazard alone or in combination with other pollutants.
PM2.5 is mostly produced by mechanical processes. These include automobile tire wear, industrial processes such as cutting and grinding, and re-suspension of particles from the ground or road surfaces by wind and human activities such as construction or agriculture. PM2.5 is mostly derived from combustion sources, such as automobiles, trucks, and other vehicle exhaust, as well as from stationary sources. These particles are either directly emitted or are formed in the atmosphere from the combustion of gases such as NOX and sulfur oxides (SOX) combining with ammonia. PM2.5 components from material in the earth’s crust, such as dust, are also present, with the amount varying in different locations.
Oakhurst Apartments Project 23
Air Quality Assessment
Construction activities would comply with SCAQMD Rule 402, which prohibits fugitive dust from creating a nuisance off-site, and Rule 403, which requires that excessive fugitive dust emissions be controlled by regular watering or other dust prevention measures. Adherence to SCAQMD Rule 403 would greatly reduce PM10 and PM2.5 concentrations. It should be noted that these estimated reductions were applied in CalEEMod. As depicted in Table 4, total PM10 and PM2.5 emissions would not exceed the SCAQMD thresholds during construction. Thus, construction-related air quality impacts would be less than significant.
Construction Equipment and Worker Vehicle Exhaust
Exhaust emissions (e.g., NOx and CO) from construction activities include emissions associated with the transport of machinery and supplies to and from the project site, emissions produced on-site as the equipment is used, and emissions from trucks transporting materials to/from the site. As depicted in Table 4, construction equipment and worker vehicle exhaust emissions would be below the established SCAQMD thresholds. Therefore, air quality impacts from equipment and vehicle exhaust emissions would be less than significant.
ROG Emissions
In addition to gaseous and particulate emissions, the application of asphalt and surface coatings creates ROG emissions, which are O3 precursors. As required, all architectural coatings for the proposed project structures would comply with SCAQMD Rule 1113. Rule 1113 provides specifications on painting practices as well as regulates the ROG content of paint. ROG emissions associated with the proposed project would be less than significant; refer to Table 4.
Total Daily Construction Emissions
In accordance with the SCAQMD Guidelines, CalEEMod was utilized to model construction emissions for ROG, NOX, CO, SOX, PM10, and PM2.5. As indicated in Table 4, criteria pollutant emissions during construction of the proposed project would not exceed the SCAQMD significance thresholds. Thus, total construction related air emissions would be less than significant.
Naturally Occurring Asbestos
Asbestos is a term used for several types of naturally occurring fibrous minerals that are human health hazards when airborne. The most common type of asbestos is chrysotile, but other types such as tremolite and actinolite are also found in California. Asbestos is classified as a known human carcinogen by State, federal, and international agencies and was identified as a toxic air contaminant by CARB in 1986.
Asbestos can be released from serpentinite and ultramafic rocks when the rock is broken or crushed. At the point of release, the asbestos fibers may become airborne, causing air quality and increase the risk of asbestos-related diseases and cancer (i.e., scarring of lungs [asbestosis], pleural disease, lung cancer, and mesothelioma). These rocks have been commonly used for unpaved gravel roads, landscaping, fill projects, and other improvement projects in some localities. Asbestos may be released to the atmosphere due to vehicular traffic on unpaved roads, during grading for development projects, and at quarry operations. All of these activities may have the effect of releasing potentially harmful asbestos into the air. Natural weathering and erosion processes can act on asbestos bearing rock and make it easier for asbestos fibers to become airborne if such rock is disturbed. According to the California Department of Conservation Division of Mines and Geology, A General Location Guide for Ultramafic Rocks in California Oakhurst Apartments Project 24
Air Quality Assessment
– Areas More Likely to Contain Naturally Occurring Asbestos Report (August 2000), serpentinite and ultramafic rocks are not known to occur within the project area.9 As such, the project is not subject to naturally occurring asbestos.
It is possible that the existing on-site structure contains asbestos, otherwise known as asbestos-containing materials [ACMs]. According to SCAQMD Rule 1403 requirements, prior to the start of demolition activities, the existing structure must be surveyed for the presence of ACMs by a specialist that is certified by California Occupational Safety and Health Administration (Cal/OSHA) for ACM surveys. If ACMs are determined to be present, Rule 1403 requires that the SCAQMD be notified a minimum of 10 days before any demolition activities begin with specific details of all asbestos to be removed, start and completion dates of demolition, work practices and engineering controls to be used to contain the asbestos emissions, estimates on the amount of asbestos to be removed, the name of the waste disposal site where the asbestos will be taken, and the names and addresses of all contractors and transporters that will be involved in the asbestos removal process. Therefore, through adherence to the ACMs removal requirements, detailed in SCAQMD Rule 1403, a less than significant impact pertaining to potential ACMs would result during demolition activities.
Operations
Long-term air quality impacts typically consist of mobile source emissions generated from project-related traffic (i.e., motor vehicle use by employees, deliveries travelling to and from the site), and emissions from area and energy sources. It should be noted that, as a conservative analysis, operational emissions associated with the existing uses are not deducted from project emissions. Emissions associated with each of these sources were calculated and are discussed below. Operational emissions generated by the proposed project are detailed in Table 5, Maximum Operational Emissions.
Table 5
Maximum Operational Emissions
Scenario Emissions (pounds per day)1
ROG NOx CO SOx PM10 PM2.5
Project Summer Emissions
Mobile Source 0.85 0.60 7.15 0.02 1.70 0.44
Energy Source 3.18 1.02 17.3 0.05 1.89 1.82
Area Source 0.01 0.13 0.06 <0.01 0.01 0.01
Total Project Maximum Daily Emissions2 4.04 1.75 24.5 0.07 3.60 2.27 SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? No No No No No No
Project Winter Emissions
Mobile Source 0.84 0.66 6.60 0.02 1.70 0.44
Energy Source 2.71 0.98 13.1 0.05 1.88 1.81
Area Source 0.01 0.13 0.06 <0.01 0.01 0.01
Total Project Maximum Daily Emission2 3.56 1.77 19.7 0.06 3.59 2.26 SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? No No No No No No
9 California Department of Conservation Division of Mines and Geology, A General Location Guide for Ultramafic Rocks in California – Areas More Likely to Contain Naturally Occurring Asbestos Report, August 2000, https://ww3.arb.ca.gov/toxics/asbestos/ofr_2000-019.pdf, accessed July 8, 2024.
Oakhurst Apartments Project 25
Air Quality Assessment
Notes:
1. Emissions were calculated using CalEEMod, version 2022.1.
2. The numbers may be slightly off due to rounding.
Refer to Appendix A for assumptions used in this analysis.
Mobile Source
Mobile sources are emissions from motor vehicles, including tailpipe and evaporative emissions.
Depending upon the pollutant being discussed, the potential air quality impact may be of either regional or local concern. For example, ROG, NOX, SOX, PM10, and PM2.5 are all pollutants of regional concern (NOX and ROG react with sunlight to form O3 [photochemical smog], and wind currents readily transport SOX, PM10, and PM2.5). However, CO tends to be a localized pollutant, dispersing rapidly at the source.
Project-generated vehicle emissions have been estimated using CalEEMod. Based on CalEEMod defaults, the proposed project would generate approximately 283 daily trips during weekdays, 255 trips on Saturdays, and 213 trips on Sundays. As shown in Table 5, emissions generated by vehicle traffic associated with the project would not exceed established SCAQMD thresholds.
Area Source Emissions
Area source emissions would be generated from consumer products, architectural coatings, and landscaping. The project’s criteria pollutant emissions from area sources would not exceed the established thresholds; refer to Table 5.
Energy Source Emissions
The primary use of electricity by the project would be for space heating and cooling, water heating, ventilation, lighting, appliances, landscaping equipment, and electronics. Criteria air pollutant emissions from electricity use were not quantified since criteria pollutants emissions occur at the site of the power plant, which is off-site. The project would install high efficiency lighting, appliances, and solar ready roofs.
However, as a conservative analysis, these project design features were not accounted for in the modeling. The project’s criteria pollutant emissions would be minimal and not exceed established thresholds; refer to Table 5.
Total Operational Emissions
As shown in Table 5, the total operational emissions would not exceed the SCAQMD significance thresholds. Therefore, impacts in this regard would be less than significant.
Air Quality Health Impacts
Adverse health effects induced by criteria pollutant emissions are highly dependent on a multitude of interconnected variables (e.g., cumulative concentrations, local meteorology and atmospheric conditions, and the number and character of exposed individual [e.g., age, gender]). In particular, ozone precursors VOCs and NOx affect air quality on a regional scale. Health effects related to ozone are therefore the product of emissions generated by numerous sources throughout a region. Existing models have limited sensitivity to small changes in criteria pollutant concentrations, and, as such, translating projectgenerated criteria pollutants to specific health effects or additional days of nonattainment would produce Oakhurst Apartments Project 26
Air Quality Assessment
meaningless results. In other words, the project’s less than significant increases in regional air pollution from criteria air pollutants would have nominal or negligible impacts on human health.
As noted in the Brief of Amicus Curiae by the SCAQMD, the SCAQMD acknowledged it would be extremely difficult, if not impossible to quantify health impacts of criteria pollutants for various reasons including modeling limitations as well as where in the atmosphere air pollutants interact and form. Further, as noted in the Brief of Amicus Curiae by the San Joaquin Valley Air Pollution Control District (SJVAPCD), SJVAPCD has acknowledged that currently available modeling tools are not equipped to provide a meaningful analysis of the correlation between an individual development project’s air emissions and specific human health impacts.
The SCAQMD acknowledges that health effects quantification from ozone, as an example is correlated with the increases in ambient level of ozone in the air (concentration) that an individual person breathes.
SCAQMD’s Brief of Amicus Curiae states that it would take a large amount of additional emissions to cause a modeled increase in ambient ozone levels over the entire region. The SCAQMD states that based on their own modeling in the SCAQMD’s 2012 Air Quality Management Plan, a reduction of 432 tons (864,000 pounds) per day of NOX and a reduction of 187 tons (374,000 pounds) per day of VOCs would reduce ozone levels at highest monitored site by only nine parts per billion. As such, the SCAQMD concludes that it is not currently possible to accurately quantify ozone-related health impacts caused by NOX or VOC emissions from relatively small projects (defined as projects with regional scope) due to photochemistry and regional model limitations. As such, for the purpose of this analysis, since the project would not exceed SCAQMD thresholds for construction and operational air emissions, the project would have a less than significant impact for air quality health impacts as well.
Cumulative Conclusion
With respect to the proposed project’s construction-related air quality emissions and cumulative Basinwide conditions, the SCAQMD has developed strategies to reduce criteria pollutant emissions outlined in the 2022 AQMP pursuant to FCAA mandates. As such, the proposed project would comply with SCAQMD Rule 403 requirements and the adopted 2022 AQMP emissions control measures. Rule 403 requires that fugitive dust be controlled with the best available control measures in order to reduce dust so that it does not remain visible in the atmosphere beyond the property line of the proposed project. Per SCAQMD rules and mandates, as well as the CEQA requirement that significant impacts be mitigated to the extent feasible, these same requirements (i.e., Rule 403 compliance, the implementation of all feasible mitigation measures, and compliance with adopted 2022 AQMP emissions control measures) would also be imposed on construction projects throughout the Basin, which would include related projects.
According to the SCAQMD CEQA Air Quality Handbook, project-related emissions that fall below the established construction and operational thresholds should be considered less than significant unless there is pertinent information to the contrary. As discussed previously, the proposed project would not result in short- or long-term air quality impacts, as emissions would not exceed the SCAQMD adopted construction or operational thresholds. Additionally, adherence to SCAQMD rules and regulations would alleviate potential impacts related to cumulative conditions on a project-by-project basis. As a result, the proposed project would not contribute a cumulatively considerable net increase of any nonattainment criteria pollutant. Therefore, the project’s incremental construction and operational impacts would be less than cumulatively considerable and impacts in this regard are less than significant.
Mitigation Measures: No mitigation is required.
Oakhurst Apartments Project 27
Air Quality Assessment
AQ-3 WOULD THE PROJECT EXPOSE SENSITIVE RECEPTORS TO SUBSTANTIAL POLLUTANT CONCENTRATIONS?
Level of Significance: Less Than Significant Impact.
Sensitive receptors are defined as facilities or land uses that include members of the population that are particularly sensitive to the effects of air pollutants, such as children, the elderly, and people with illnesses.
Examples of these sensitive receptors are residences, schools, hospitals, and daycare centers. CARB has identified the following groups of individuals as the most likely to be affected by air pollution: the elderly over 65, children under 14, athletes, and persons with cardiovascular and chronic respiratory diseases such as asthma, emphysema, and bronchitis.
The nearest sensitive receptors to the project site are the existing multi-family residential uses located approximately 15 feet to the north and south, and multi-family residential uses located approximately 25 feet to the east. To identify impacts to sensitive receptors, the SCAQMD recommends addressing localized significance thresholds (LSTs) for construction and operations impacts (area sources only). The CO hotspot analysis following the LST analysis addresses localized mobile source impacts.
Localized Significance Thresholds
LSTs were developed in response to SCAQMD Governing Boards’ Environmental Justice Enhancement Initiative (I-4). The SCAQMD provided the Final Localized Significance Threshold Methodology (dated June 2003 [revised 2008]) for guidance. The LST methodology assists lead agencies in analyzing localized air quality impacts. The SCAQMD provides the LST screening lookup tables for one-, two-, and five-acre projects emitting CO, NOX, PM2.5, or PM10. The LST methodology and associated mass rates are not designed to evaluate localized impacts from mobile sources traveling over the roadways. The project is located within SRA 2, Northwest Los Angeles County Coastal.
Construction LST
The SCAQMD guidance on applying CalEEMod to LSTs specifies the number of acres a particular piece of equipment would likely disturb per day.10 SCAQMD provides LST thresholds for one-, two-, and five-acre site disturbance areas; SCAQMD does not provide LST thresholds for projects over five acres. The project would actively disturb approximately one acre per day during the grading phase of construction.
Therefore, the LST thresholds for one-acre were utilized for the construction LST analysis. The closest sensitive receptors are the existing multi-family residential uses adjacent to the north and south, approximately 15 feet away. While there are receptors to the east and west that are slightly further away, the following analysis would analyze the impacts on the nearest sensitive receptors to the north and south of the project site as a conservative analysis. These sensitive land uses may be potentially affected by air pollutant emissions generated during on-site construction activities. LST thresholds are provided for distances to sensitive receptors of 25, 50, 100, 200, and 500 meters. As the nearest sensitive uses are located approximately 15 feet from the project site, the LST values for 25 meters (82 feet) were used. It should be noted that the following analysis would also address localized air quality impacts for receptors to the east and west as they are located within 25 meters (82 feet) of the project site. 10 The number of acres represent the total acres traversed by grading equipment. To properly grade a piece of land, multiple passes with equipment may be required. The disturbance acreage is based on the equipment list and days of the grading phase according to the anticipated maximum number of acres a given piece of equipment can pass over in an 8-hour workday.
Oakhurst Apartments Project 28
Air Quality Assessment
Table 6, Localized Significance of Construction Emissions, shows the localized construction-related emissions for NOX, CO, PM10, and PM2.5 compared to the LSTs for SRA 2. It is noted that the localized emissions presented in Table 6 are less than those in Table 4 because localized emissions include only onsite emissions (i.e., from construction equipment and fugitive dust), and do not include off-site emissions (i.e., from hauling activities). As shown in Table 6, localized construction emissions would not exceed the LSTs for SRA 2. Therefore, localized significance impacts from construction would be less than significant.
Table 6
Localized Significance of Construction Emissions
Construction Year Emissions (pounds per day)
NOX CO PM10 PM2.5
Year 1 (2025)1 10.1 10.0 1.84 1.10
Year 2 (2026)2 9.95 12.7 1.80 1.06
Year 3 (2027)3 9.59 12.7 0.30 0.27
Year 4 (2028)3 9.23 12.7 0.26 0.24
Maximum Daily Emissions4 10.1 12.7 1.84 1.10
Localized Significance Threshold5 103.0 562.0 4.0 3.0
Thresholds Exceeded? No No No No
Notes:
1. Maximum on-site daily emissions occur during grading phase for NOX, CO, PM10, and PM2.5 in Year 1 (2025).
2. Maximum on-site daily emissions occur during building construction phase for NOx and CO, and during grading phase for PM10 and PM2.5 in Year 2 (2026).
3. Maximum on-site daily emissions occur during building construction phase for NOX, CO, PM10, and PM2.5 in Year 3 (2027) and Year 4 (2028).
4. Modeling assumptions include compliance with SCAQMD Rule 403 which requires the following: properly maintain mobile and other construction equipment; replace ground cover in disturbed areas quickly; water exposed surfaces three times daily; cover stockpiles with tarps; water all haul roads twice daily; and limit speeds on unpaved roads to 15 miles per hour.
5. The Localized Significance Threshold Mass Rate Screening Criteria was determined using Appendix C of the SCAQMD Final Localized Significant Threshold Methodology guidance document for pollutants NOX, CO, PM10, and PM2.5. The Localized Significance Threshold was based on the anticipated daily acreage disturbance for construction (approximately one acre; therefore, the one-acre threshold was used) and Source Receptor Area 2.
Refer to Appendix A for assumptions used in this analysis.
Operational LST
According to SCAQMD LST methodology, LSTs would apply to operational activities if the project includes stationary sources or attracts mobile sources that may spend extended periods queuing and idling at the site (i.e., warehouse or transfer facilities). The proposed residential development does not include such uses. Thus, due to the lack of such emissions, no long-term LST analysis is needed. Operational LST impacts would be less than significant in this regard.
Carbon Monoxide Hotspots
CO emissions are a function of vehicle idling time, meteorological conditions, and traffic flow. Under certain extreme meteorological conditions, CO concentrations near a congested roadway or intersection may reach unhealthful levels (e.g., adversely affecting residents, school children, hospital patients, and the elderly).
The Basin is designated as an attainment/maintenance area for the federal CO standards and an Oakhurst Apartments Project 29
Air Quality Assessment
attainment area under State standards. There has been a decline in CO emissions even though vehicle miles traveled (VMT) on U.S. urban and rural roads have increased; estimated anthropogenic CO emissions have decreased 68 percent between 1990 and 2014. In 2014, mobile sources accounted for 82 percent of the nation’s total anthropogenic CO emissions. Three major control programs have contributed to the reduced per-vehicle CO emissions, including exhaust standards, cleaner burning fuels, and motor vehicle inspection/maintenance programs.
According to the SCAQMD CEQA Air Quality Handbook, a potential CO hotspot may occur at any location where the background CO concentration already exceeds 9.0 parts per million (ppm), which is the 8-hour California ambient air quality standard. As previously discussed, the site is in SRA 2. Communities within SRAs are expected to have similar climatology and ambient air pollutant concentrations. The monitoring station closest to the project site is the West Los Angeles-VA Hospital Monitoring Station located at Wilshire Boulevard and Sawtelle, Los Angeles CA 90025, which is located approximately 1.34 miles southeast of the site. The CO measurements collected by this monitoring station is representative of the background CO concentration due to its close proximity to the project. The maximum CO concentration at West Los Angeles-VA Hospital Monitoring station was measured at 1.672 ppm in 2022, refer to Table
1. Given that the background CO concentration does not currently exceed 9.0 ppm, a CO hotspot would not occur at the project site.
Additionally, a detailed CO analysis was conducted in the Federal Attainment Plan for Carbon Monoxide (CO Plan) for the SCAQMD’s 2003 Air Quality Management Plan, which is the most recent AQMP that addresses CO concentrations. The locations selected for microscale modeling in the CO Plan are worstcase intersections in the Basin and would likely experience the highest CO concentrations. Thus, CO analysis within the CO Plan is utilized in a comparison to the proposed project since it represents a worstcase scenario with heavy traffic volumes within the Basin.
Of these locations, the Wilshire Boulevard/Veteran Avenue intersection in Los Angeles experienced the highest CO concentration (4.6 ppm), which is well below the 35-ppm 1-hr CO federal standard. The Wilshire Boulevard/Veteran Avenue intersection is one of the most congested intersections in Southern California with an average daily trip (ADT) volume of approximately 100,000 vehicles per day. The Beverly Boulevard currently has traffic volumes ranging from 14,100 to 16,500 ADT.11 Even with the addition of the project’s traffic generation ranging from 213 to 283 ADT, Beverly Boulevard would not experience traffic volumes exceeding 100,000 vehicles per day. As the CO hotspots were not experienced at the Wilshire Boulevard/Veteran Avenue intersection, it can be reasonably inferred that CO hotspots would not be experienced at any intersections near the project site due to the comparatively low volume of traffic that would occur as a result of project implementation. Therefore, CO hotspot impacts would not be experienced in the project’s vicinity and a less than significant impact would occur in this regard.
Mitigation Measures: No mitigation is required.
AQ-4 WOULD THE PROJECT RESULT IN OTHER EMISSIONS (SUCH AS THOSE LEADING TO ODORS) ADVERSELY AFFECTING A SUBSTANTIAL NUMBER OF PEOPLE?
Level of Significance: Less Than Significant Impact.
11 City of Beverly Hills Traffic Engineering, Traffic Flow Data, https://www.beverlyhills.org/950/Traffic-Engineering, accessed July 11, 2024.
Oakhurst Apartments Project 30
Air Quality Assessment
According to the SCAQMD CEQA Air Quality Handbook, land uses associated with odor complaints typically include agricultural uses, wastewater treatment plants, food processing plants, chemical plants, composting, refineries, landfills, dairies, and fiberglass molding. The proposed project does not include any uses identified by the SCAQMD as being associated with odors. As such, operation of the proposed project would not generate odors that would impact nearby receptors and a less than significant impact would occur in this regard.
However, certain odors may emanate from construction operations if diesel-powered construction equipment during the construction period for the project. These odors would be limited to the construction period and would disperse quickly; therefore, these odors would not be considered a significant impact. Construction activities associated with the project may generate detectable odors from heavy-duty equipment exhaust and architectural coatings. However, construction-related odors would be short-term in nature and cease upon project completion. In addition, the project would be required to comply with the California Code of Regulations, Title 13, sections 2449(d)(3) and 2485, which minimizes the idling time of construction equipment either by shutting it off when not in use or by reducing the time of idling to no more than five minutes. This would further reduce the detectable odors from heavy-duty equipment exhaust. The project would also comply with the SCAQMD Regulation XI, Rule 1113 – Architectural Coating, which would minimize odor impacts from ROG emissions during architectural coating. Any impacts to existing adjacent land uses would be short-term and are less than significant.
Mitigation Measures: No mitigation is required.
Oakhurst Apartments Project 31
Air Quality Assessment
REFERENCES
Documents
1. California Air Resources Board, Ambient Air Quality Standards Chart, http://www.arb.ca.gov/research/aaqs/aaqs2.pdf, May 4, 2016.
2. California Air Resources Board, ADAM Air Quality Data Statistics, http://www.arb.ca.gov/adam/, accessed July 8, 2024.
3. California Air Resources Board, AQMIS2: Air Quality Data, https://www.arb.ca.gov/aqmis2/aqdselect.php, accessed July 8, 2024.
4. California Department of Conservation Division of Mines and Geology, A General Location Guide for Ultramafic Rocks in California – Areas More Likely to Contain Naturally Occurring Asbestos Report, August 2000, https://ww3.arb.ca.gov/toxics/asbestos/ofr_2000-019.pdf, accessed July 8, 2024.
5. City of Beverly Hills, General Plan Land Use Designation – City of Beverly Hills, January 25, 2022, https://www.beverlyhills.org/cbhfiles/storage/files/8673173201260376675/Landuse_11x17_20 220125.pdf, accessed July 8, 2024.
6. City of Beverly Hills Traffic Engineering, Traffic Flow Data, https://www.beverlyhills.org/950/Traffic-Engineering, accessed July 11, 2024.
7. City of Los Angeles, General Plan Land Use Map, Wilshire Community Map, https://planning.lacity.gov/odocument/2ec22248-3c1e-4354-b5d1- 096cdf9845ab/wilplanmap.pdf, accessed July 8, 2024.
8. City of Los Angeles, Air Quality Element¸ Adopted November 24, 1992, https://planning.lacity.gov/odocument/0ff9a9b0-0adf-49b4-8e07- 0c16feea70bc/Air_Quality_Element.pdf, accessed July 8, 2024.
9. Southern California Association of Governments, 2020–2045 Regional Transportation Plan/Sustainable Communities Strategy, September 3, 2020.
10. South Coast Air Quality Management District, 2022 Air Quality Management Plan, December 2, 2022.
11. South Coast Air Quality Management District, CEQA Air Quality Handbook, November 1993.
12. South Coast Air Quality Management District, Final Localized Significance Threshold Methodology, July 2008.
13. South Coast Air Quality Management District, South Coast AQMD Air Quality Significance Thresholds, April 2019.
Oakhurst Apartments Project 32
Air Quality Assessment
14. South Coast Air Quality Management District, Regulation XI Source Specific Standards, http://www.aqmd.gov/docs/default-source/rule-book/reg-xi/r1113.pdf?sfvrsn=15, July 8, 2024.
15. Weather Spark, Average Weather in Los Angeles, California, United States, https://weatherspark.com/y/145341/Average‐Weather‐at‐Los‐Angeles‐International‐Airport‐ California‐United‐States‐Year‐Round, accessed July 8, 2024.
Programs
1. Google Earth Pro, 2024.
2. California Air Pollution Control Officers Association, California Emissions Estimator Model (CalEEMod), version 2022.1.
Appendix A
Air Quality Emissions Data
412 N Oakhurst Drive Detailed Report, 8/1/2024
1 / 82
412 N Oakhurst Drive Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year, Unmitigated
2.3. Construction Emissions by Year, Mitigated
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
2.6. Operations Emissions by Sector, Mitigated
3. Construction Emissions Details
3.1. Demolition (2025) - Unmitigated
3.2. Demolition (2025) - Mitigated
3.3. Grading (2025) - Unmitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
2 / 82
3.4. Grading (2025) - Mitigated
3.5. Grading (2026) - Unmitigated
3.6. Grading (2026) - Mitigated
3.7. Building Construction (2026) - Unmitigated
3.8. Building Construction (2026) - Mitigated
3.9. Building Construction (2027) - Unmitigated
3.10. Building Construction (2027) - Mitigated
3.11. Building Construction (2028) - Unmitigated
3.12. Building Construction (2028) - Mitigated
3.13. Architectural Coating (2028) - Unmitigated
3.14. Architectural Coating (2028) - Mitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.1.2. Mitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.2. Electricity Emissions By Land Use - Mitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
3 / 82
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.2.4. Natural Gas Emissions By Land Use - Mitigated
4.3. Area Emissions by Source
4.3.1. Unmitigated
4.3.2. Mitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
4.4.2. Mitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
4.5.2. Mitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.6.2. Mitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
4.7.2. Mitigated
4.8. Stationary Emissions By Equipment Type
412 N Oakhurst Drive Detailed Report, 8/1/2024
4 / 82
4.8.1. Unmitigated
4.8.2. Mitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.9.2. Mitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.2.2. Mitigated
5.3. Construction Vehicles
412 N Oakhurst Drive Detailed Report, 8/1/2024
5 / 82
5.3.1. Unmitigated
5.3.2. Mitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.9. Operational Mobile Sources
5.9.1. Unmitigated
5.9.2. Mitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.1.2. Mitigated
5.10.2. Architectural Coatings
412 N Oakhurst Drive Detailed Report, 8/1/2024
6 / 82
5.10.3. Landscape Equipment
5.10.4. Landscape Equipment - Mitigated
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.11.2. Mitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.12.2. Mitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.13.2. Mitigated
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.14.2. Mitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.15.2. Mitigated
5.16. Stationary Sources
412 N Oakhurst Drive Detailed Report, 8/1/2024
7 / 82
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
5.18.2.2. Mitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
412 N Oakhurst Drive Detailed Report, 8/1/2024
8 / 82
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
412 N Oakhurst Drive Detailed Report, 8/1/2024
9 / 82
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name 412 N Oakhurst Drive
Construction Start Date 10/1/2025
Operational Year 2028
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70
Precipitation (days) 19.6
Location 412 N Oakhurst Dr, Beverly Hills, CA 90210, USA County Los Angeles-South Coast
City —
Air District South Coast AQMD
Air Basin South Coast
TAZ 4342
EDFZ 16
Electric Utility Los Angeles Department of Water & Power Gas Utility Southern California Gas
App Version 2022.1.1.26
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Apartments Mid
Rise
52.0 Dwelling Unit 0.35 54,619 478 — 154 —
412 N Oakhurst Drive Detailed Report, 8/1/2024
10 / 82
Enclosed Parking
with Elevator
75.0 Space 0.00 30,000 0.00 — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector # Measure Title
Construction C-10-A Water Exposed Surfaces
Construction C-10-B Water Active Demolition Sites
Construction C-11 Limit Vehicle Speeds on Unpaved Roads
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 8.12 8.09 10.5 16.1 0.02 0.43 5.67 6.10 0.40 2.66 3.06 — 3,099 3,099 0.13 0.16 3.18 3,131 Mit. 8.12 8.09 10.5 16.1 0.02 0.43 1.73 2.16 0.40 0.76 1.16 — 3,099 3,099 0.13 0.16 3.18 3,131 %
Reduced
— — — — — — 69% 65% — 71% 62% — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.62 1.34 11.3 15.7 0.02 0.48 5.67 6.14 0.44 2.66 3.10 — 3,064 3,064 0.13 0.17 0.08 3,093 Mit. 1.62 1.34 11.3 15.7 0.02 0.48 1.73 2.21 0.44 0.76 1.20 — 3,064 3,064 0.13 0.17 0.08 3,093 %
Reduced
— — — — — — 69% 64% — 71% 61% — — — — — — —
Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
11 / 82
Unmit. 1.22 1.17 7.48 11.1 0.02 0.28 2.57 2.85 0.26 1.16 1.42 — 2,182 2,182 0.09 0.09 0.90 2,202 Mit. 1.22 1.17 7.48 11.1 0.02 0.28 0.94 1.22 0.26 0.37 0.63 — 2,182 2,182 0.09 0.09 0.90 2,202 %
Reduced
— — — — — — 64% 57% — 68% 56% — — — — — — —
Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.22 0.21 1.36 2.03 < 0.005 0.05 0.47 0.52 0.05 0.21 0.26 — 361 361 0.01 0.02 0.15 365 Mit. 0.22 0.21 1.36 2.03 < 0.005 0.05 0.17 0.22 0.05 0.07 0.11 — 361 361 0.01 0.02 0.15 365 %
Reduced
— — — — — — 64% 57% — 68% 56% — — — — — — —
2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2026 1.62 1.35 10.5 16.1 0.02 0.43 5.67 6.10 0.40 2.66 3.06 — 3,099 3,099 0.13 0.16 3.18 3,131 2027 1.55 1.29 10.1 15.9 0.02 0.30 0.74 1.04 0.28 0.18 0.46 — 3,079 3,079 0.13 0.08 2.91 3,111 2028 8.12 8.09 0.84 1.68 < 0.005 0.02 0.13 0.15 0.01 0.03 0.04 — 264 264 0.01 0.01 0.37 266 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2025 1.40 1.13 11.3 10.9 0.02 0.48 5.67 6.14 0.44 2.66 3.10 — 2,753 2,753 0.13 0.17 0.07 2,805 2026 1.62 1.34 10.5 15.7 0.02 0.43 5.67 6.10 0.40 2.66 3.06 — 3,064 3,064 0.13 0.16 0.08 3,093 2027 1.55 1.29 10.2 15.4 0.02 0.30 0.74 1.04 0.28 0.18 0.46 — 3,045 3,045 0.11 0.08 0.08 3,073 2028 1.49 1.24 9.77 15.2 0.02 0.27 0.74 1.01 0.25 0.18 0.42 — 3,026 3,026 0.10 0.08 0.07 3,054 Average
Daily
— — — — — — — — — — — — — — — — — —
2025 0.18 0.14 1.39 1.58 < 0.005 0.05 0.47 0.52 0.05 0.18 0.23 — 375 375 0.02 0.02 0.17 382 2026 1.03 0.84 7.48 9.11 0.02 0.28 2.57 2.85 0.26 1.16 1.42 — 2,055 2,055 0.09 0.09 0.84 2,086 412 N Oakhurst Drive Detailed Report, 8/1/2024
12 / 82
2027 1.10 0.92 7.26 11.1 0.02 0.22 0.52 0.74 0.20 0.13 0.32 — 2,182 2,182 0.08 0.06 0.90 2,202 2028 1.22 1.17 1.84 2.92 < 0.005 0.05 0.15 0.20 0.05 0.03 0.08 — 571 571 0.02 0.02 0.22 577 Annual — — — — — — — — — — — — — — — — — —
2025 0.03 0.03 0.25 0.29 < 0.005 0.01 0.09 0.10 0.01 0.03 0.04 — 62.0 62.0 < 0.005 < 0.005 0.03 63.2 2026 0.19 0.15 1.36 1.66 < 0.005 0.05 0.47 0.52 0.05 0.21 0.26 — 340 340 0.01 0.02 0.14 345 2027 0.20 0.17 1.32 2.03 < 0.005 0.04 0.10 0.14 0.04 0.02 0.06 — 361 361 0.01 0.01 0.15 365 2028 0.22 0.21 0.34 0.53 < 0.005 0.01 0.03 0.04 0.01 0.01 0.01 — 94.6 94.6 < 0.005 < 0.005 0.04 95.5
2.3. Construction Emissions by Year, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2026 1.62 1.35 10.5 16.1 0.02 0.43 1.73 2.16 0.40 0.76 1.16 — 3,099 3,099 0.13 0.16 3.18 3,131 2027 1.55 1.29 10.1 15.9 0.02 0.30 0.74 1.04 0.28 0.18 0.46 — 3,079 3,079 0.13 0.08 2.91 3,111 2028 8.12 8.09 0.84 1.68 < 0.005 0.02 0.13 0.15 0.01 0.03 0.04 — 264 264 0.01 0.01 0.37 266 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2025 1.40 1.13 11.3 10.9 0.02 0.48 1.73 2.21 0.44 0.76 1.20 — 2,753 2,753 0.13 0.17 0.07 2,805 2026 1.62 1.34 10.5 15.7 0.02 0.43 1.73 2.16 0.40 0.76 1.16 — 3,064 3,064 0.13 0.16 0.08 3,093 2027 1.55 1.29 10.2 15.4 0.02 0.30 0.74 1.04 0.28 0.18 0.46 — 3,045 3,045 0.11 0.08 0.08 3,073 2028 1.49 1.24 9.77 15.2 0.02 0.27 0.74 1.01 0.25 0.18 0.42 — 3,026 3,026 0.10 0.08 0.07 3,054 Average
Daily
— — — — — — — — — — — — — — — — — —
2025 0.18 0.14 1.39 1.58 < 0.005 0.05 0.20 0.25 0.05 0.06 0.11 — 375 375 0.02 0.02 0.17 382 2026 1.03 0.84 7.48 9.11 0.02 0.28 0.94 1.22 0.26 0.37 0.63 — 2,055 2,055 0.09 0.09 0.84 2,086 2027 1.10 0.92 7.26 11.1 0.02 0.22 0.52 0.74 0.20 0.13 0.32 — 2,182 2,182 0.08 0.06 0.90 2,202 2028 1.22 1.17 1.84 2.92 < 0.005 0.05 0.15 0.20 0.05 0.03 0.08 — 571 571 0.02 0.02 0.22 577 412 N Oakhurst Drive Detailed Report, 8/1/2024
13 / 82
Annual — — — — — — — — — — — — — — — — — —
2025 0.03 0.03 0.25 0.29 < 0.005 0.01 0.04 0.05 0.01 0.01 0.02 — 62.0 62.0 < 0.005 < 0.005 0.03 63.2 2026 0.19 0.15 1.36 1.66 < 0.005 0.05 0.17 0.22 0.05 0.07 0.11 — 340 340 0.01 0.02 0.14 345 2027 0.20 0.17 1.32 2.03 < 0.005 0.04 0.10 0.14 0.04 0.02 0.06 — 361 361 0.01 0.01 0.15 365 2028 0.22 0.21 0.34 0.53 < 0.005 0.01 0.03 0.04 0.01 0.01 0.01 — 94.6 94.6 < 0.005 < 0.005 0.04 95.5
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 5.65 4.04 1.75 24.5 0.07 1.91 1.69 3.60 1.84 0.43 2.27 331 3,533 3,864 4.05 0.09 5.40 3,996 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 5.13 3.56 1.77 19.7 0.06 1.90 1.69 3.59 1.83 0.43 2.26 331 3,444 3,776 4.05 0.09 0.52 3,904 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.70 2.49 0.85 10.3 0.02 0.15 1.59 1.74 0.15 0.40 0.55 45.5 2,469 2,514 2.69 0.09 2.45 2,610 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.49 0.45 0.16 1.88 < 0.005 0.03 0.29 0.32 0.03 0.07 0.10 7.53 409 416 0.45 0.01 0.41 432
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
14 / 82
Mobile 0.94 0.85 0.60 7.15 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,811 1,811 0.08 0.07 5.01 1,839 Area 4.70 3.18 1.02 17.3 0.05 1.89 — 1.89 1.82 — 1.82 307 999 1,306 1.45 < 0.005 — 1,342 Energy 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 698 698 0.05 0.01 — 701 Water — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Waste — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Refrig. — — — — — — — — — — — — — — — — 0.39 0.39
Total 5.65 4.04 1.75 24.5 0.07 1.91 1.69 3.60 1.84 0.43 2.27 331 3,533 3,864 4.05 0.09 5.40 3,996 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.93 0.84 0.66 6.60 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,736 1,736 0.09 0.07 0.13 1,760 Area 4.19 2.71 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Energy 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 698 698 0.05 0.01 — 701 Water — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Waste — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Refrig. — — — — — — — — — — — — — — — — 0.39 0.39
Total 5.13 3.56 1.77 19.7 0.06 1.90 1.69 3.59 1.83 0.43 2.26 331 3,444 3,776 4.05 0.09 0.52 3,904 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 0.88 0.79 0.63 6.43 0.02 0.01 1.59 1.60 0.01 0.40 0.41 — 1,670 1,670 0.08 0.07 2.06 1,695 Area 1.81 1.68 0.09 3.81 < 0.005 0.13 — 0.13 0.13 — 0.13 21.0 76.6 97.6 0.10 < 0.005 — 100 Energy 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 698 698 0.05 0.01 — 701 Water — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Waste — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Refrig. — — — — — — — — — — — — — — — — 0.39 0.39
Total 2.70 2.49 0.85 10.3 0.02 0.15 1.59 1.74 0.15 0.40 0.55 45.5 2,469 2,514 2.69 0.09 2.45 2,610 Annual — — — — — — — — — — — — — — — — — —
Mobile 0.16 0.14 0.11 1.17 < 0.005 < 0.005 0.29 0.29 < 0.005 0.07 0.08 — 276 276 0.01 0.01 0.34 281 Area 0.33 0.31 0.02 0.70 < 0.005 0.02 — 0.02 0.02 — 0.02 3.48 12.7 16.2 0.02 < 0.005 — 16.6 412 N Oakhurst Drive Detailed Report, 8/1/2024
15 / 82
Energy < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 116 116 0.01 < 0.005 — 116 Water — — — — — — — — — — — 0.61 4.15 4.76 0.06 < 0.005 — 6.80 Waste — — — — — — — — — — — 3.43 0.00 3.43 0.34 0.00 — 12.0 Refrig. — — — — — — — — — — — — — — — — 0.06 0.06
Total 0.49 0.45 0.16 1.88 < 0.005 0.03 0.29 0.32 0.03 0.07 0.10 7.53 409 416 0.45 0.01 0.41 432
2.6. Operations Emissions by Sector, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.94 0.85 0.60 7.15 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,811 1,811 0.08 0.07 5.01 1,839 Area 4.70 3.18 1.02 17.3 0.05 1.89 — 1.89 1.82 — 1.82 307 999 1,306 1.45 < 0.005 — 1,342 Energy 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 698 698 0.05 0.01 — 701 Water — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Waste — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Refrig. — — — — — — — — — — — — — — — — 0.39 0.39
Total 5.65 4.04 1.75 24.5 0.07 1.91 1.69 3.60 1.84 0.43 2.27 331 3,533 3,864 4.05 0.09 5.40 3,996 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.93 0.84 0.66 6.60 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,736 1,736 0.09 0.07 0.13 1,760 Area 4.19 2.71 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Energy 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 698 698 0.05 0.01 — 701 Water — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Waste — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Refrig. — — — — — — — — — — — — — — — — 0.39 0.39
Total 5.13 3.56 1.77 19.7 0.06 1.90 1.69 3.59 1.83 0.43 2.26 331 3,444 3,776 4.05 0.09 0.52 3,904 412 N Oakhurst Drive Detailed Report, 8/1/2024
16 / 82
Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 0.88 0.79 0.63 6.43 0.02 0.01 1.59 1.60 0.01 0.40 0.41 — 1,670 1,670 0.08 0.07 2.06 1,695 Area 1.81 1.68 0.09 3.81 < 0.005 0.13 — 0.13 0.13 — 0.13 21.0 76.6 97.6 0.10 < 0.005 — 100 Energy 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 698 698 0.05 0.01 — 701 Water — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Waste — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Refrig. — — — — — — — — — — — — — — — — 0.39 0.39
Total 2.70 2.49 0.85 10.3 0.02 0.15 1.59 1.74 0.15 0.40 0.55 45.5 2,469 2,514 2.69 0.09 2.45 2,610 Annual — — — — — — — — — — — — — — — — — —
Mobile 0.16 0.14 0.11 1.17 < 0.005 < 0.005 0.29 0.29 < 0.005 0.07 0.08 — 276 276 0.01 0.01 0.34 281 Area 0.33 0.31 0.02 0.70 < 0.005 0.02 — 0.02 0.02 — 0.02 3.48 12.7 16.2 0.02 < 0.005 — 16.6 Energy < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 116 116 0.01 < 0.005 — 116 Water — — — — — — — — — — — 0.61 4.15 4.76 0.06 < 0.005 — 6.80 Waste — — — — — — — — — — — 3.43 0.00 3.43 0.34 0.00 — 12.0 Refrig. — — — — — — — — — — — — — — — — 0.06 0.06
Total 0.49 0.45 0.16 1.88 < 0.005 0.03 0.29 0.32 0.03 0.07 0.10 7.53 409 416 0.45 0.01 0.41 432
3. Construction Emissions Details
3.1. Demolition (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
17 / 82
Off-Roa
Equipment
0.68 0.56 5.16 6.67 0.01 0.18 — 0.18 0.17 — 0.17 — 994 994 0.04 0.01 — 997 Demoliti
on
— — — — — — 0.75 0.75 — 0.11 0.11 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.08 0.07 0.61 0.79 < 0.005 0.02 — 0.02 0.02 — 0.02 — 117 117 < 0.005 < 0.005 — 117 Demoliti
on
— — — — — — 0.09 0.09 — 0.01 0.01 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.11 0.14 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 19.4 19.4 < 0.005 < 0.005 — 19.5 Demoliti
on
— — — — — — 0.02 0.02 — < 0.005 < 0.005 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.06 0.74 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 164 164 0.01 0.01 0.02 166 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.05 0.01 0.77 0.29 < 0.005 0.01 0.16 0.17 0.01 0.04 0.05 — 601 601 0.03 0.09 0.04 630 412 N Oakhurst Drive Detailed Report, 8/1/2024
18 / 82
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.09 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 19.6 19.6 < 0.005 < 0.005 0.03 19.8 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 < 0.005 0.09 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 — 70.8 70.8 < 0.005 0.01 0.07 74.3 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 3.24 3.24 < 0.005 < 0.005 0.01 3.29 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 11.7 11.7 < 0.005 < 0.005 0.01 12.3
3.2. Demolition (2025) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.68 0.56 5.16 6.67 0.01 0.18 — 0.18 0.17 — 0.17 — 994 994 0.04 0.01 — 997 Demoliti
on
— — — — — — 0.48 0.48 — 0.07 0.07 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
19 / 82
Off-Roa 0.08 0.07 0.61 0.79 < 0.005 0.02 — 0.02 0.02 — 0.02 — 117 117 < 0.005 < 0.005 — 117 d
Equipm
ent
Demoliti
on
— — — — — — 0.06 0.06 — 0.01 0.01 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.11 0.14 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 19.4 19.4 < 0.005 < 0.005 — 19.5 Demoliti
on
— — — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.06 0.74 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 164 164 0.01 0.01 0.02 166 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.05 0.01 0.77 0.29 < 0.005 0.01 0.16 0.17 0.01 0.04 0.05 — 601 601 0.03 0.09 0.04 630 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.09 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 19.6 19.6 < 0.005 < 0.005 0.03 19.8 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 < 0.005 0.09 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 — 70.8 70.8 < 0.005 0.01 0.07 74.3 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 3.24 3.24 < 0.005 < 0.005 0.01 3.29 412 N Oakhurst Drive Detailed Report, 8/1/2024
20 / 82
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 11.7 11.7 < 0.005 < 0.005 0.01 12.3
3.3. Grading (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.29 1.09 10.1 10.0 0.02 0.46 — 0.46 0.43 — 0.43 — 1,714 1,714 0.07 0.01 — 1,720 Dust
From
Material
Movement
— — — — — — 5.32 5.32 — 2.57 2.57 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.08 0.07 0.61 0.61 < 0.005 0.03 — 0.03 0.03 — 0.03 — 104 104 < 0.005 < 0.005 — 104 Dust
From
Material
Movement
— — — — — — 0.32 0.32 — 0.16 0.16 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 412 N Oakhurst Drive Detailed Report, 8/1/2024
21 / 82
Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.11 0.11 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 — 17.2 17.2 < 0.005 < 0.005 — 17.3 Dust
From
Material
Movement
— — — — — — 0.06 0.06 — 0.03 0.03 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04 0.03 0.04 0.44 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 98.3 98.3 < 0.005 < 0.005 0.01 99.5 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.07 0.01 1.20 0.45 0.01 0.01 0.25 0.26 0.01 0.07 0.08 — 941 941 0.05 0.15 0.06 986 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 6.05 6.05 < 0.005 < 0.005 0.01 6.13 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.07 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 — 57.0 57.0 < 0.005 0.01 0.06 59.8 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.00 1.00 < 0.005 < 0.005 < 0.005 1.02 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 9.44 9.44 < 0.005 < 0.005 0.01 9.91
3.4. Grading (2025) - Mitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
22 / 82
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.29 1.09 10.1 10.0 0.02 0.46 — 0.46 0.43 — 0.43 — 1,714 1,714 0.07 0.01 — 1,720 Dust
From
Material
Movement
— — — — — — 1.38 1.38 — 0.67 0.67 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.08 0.07 0.61 0.61 < 0.005 0.03 — 0.03 0.03 — 0.03 — 104 104 < 0.005 < 0.005 — 104 Dust
From
Material
Movement
— — — — — — 0.08 0.08 — 0.04 0.04 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.11 0.11 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 — 17.2 17.2 < 0.005 < 0.005 — 17.3 412 N Oakhurst Drive Detailed Report, 8/1/2024
23 / 82
Dust — — — — — — 0.02 0.02 — 0.01 0.01 — — — — — — —
From
Material
Movement
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04 0.03 0.04 0.44 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 98.3 98.3 < 0.005 < 0.005 0.01 99.5 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.07 0.01 1.20 0.45 0.01 0.01 0.25 0.26 0.01 0.07 0.08 — 941 941 0.05 0.15 0.06 986 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 6.05 6.05 < 0.005 < 0.005 0.01 6.13 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.07 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 — 57.0 57.0 < 0.005 0.01 0.06 59.8 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.00 1.00 < 0.005 < 0.005 < 0.005 1.02 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 9.44 9.44 < 0.005 < 0.005 0.01 9.91
3.5. Grading (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
24 / 82
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Off-Roa
d
Equipm
ent
1.22 1.02 9.19 9.69 0.02 0.42 — 0.42 0.39 — 0.39 — 1,714 1,714 0.07 0.01 — 1,720 Dust
From
Material
Movement
— — — — — — 5.32 5.32 — 2.57 2.57 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.22 1.02 9.19 9.69 0.02 0.42 — 0.42 0.39 — 0.39 — 1,714 1,714 0.07 0.01 — 1,720 Dust
From
Material
Movement
— — — — — — 5.32 5.32 — 2.57 2.57 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.51 0.43 3.81 4.02 0.01 0.17 — 0.17 0.16 — 0.16 — 711 711 0.03 0.01 — 714 Dust
From
Material
Movement
— — — — — — 2.21 2.21 — 1.07 1.07 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 412 N Oakhurst Drive Detailed Report, 8/1/2024
25 / 82
Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.09 0.08 0.70 0.73 < 0.005 0.03 — 0.03 0.03 — 0.03 — 118 118 < 0.005 < 0.005 — 118 Dust
From
Material
Movement
— — — — — — 0.40 0.40 — 0.19 0.19 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.48 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 102 102 < 0.005 < 0.005 0.34 103 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.07 0.01 1.11 0.44 0.01 0.01 0.25 0.26 0.01 0.07 0.08 — 923 923 0.05 0.15 2.07 970 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.41 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 96.3 96.3 < 0.005 < 0.005 0.01 97.5 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.07 0.01 1.16 0.44 0.01 0.01 0.25 0.26 0.01 0.07 0.08 — 924 924 0.05 0.15 0.05 969 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.18 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 40.6 40.6 < 0.005 < 0.005 0.06 41.1 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.03 0.01 0.48 0.18 < 0.005 < 0.005 0.10 0.11 < 0.005 0.03 0.03 — 383 383 0.02 0.06 0.37 402 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 6.71 6.71 < 0.005 < 0.005 0.01 6.80 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 < 0.005 0.09 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 — 63.4 63.4 < 0.005 0.01 0.06 66.6 412 N Oakhurst Drive Detailed Report, 8/1/2024
26 / 82
3.6. Grading (2026) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.22 1.02 9.19 9.69 0.02 0.42 — 0.42 0.39 — 0.39 — 1,714 1,714 0.07 0.01 — 1,720 Dust
From
Material
Movement
— — — — — — 1.38 1.38 — 0.67 0.67 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.22 1.02 9.19 9.69 0.02 0.42 — 0.42 0.39 — 0.39 — 1,714 1,714 0.07 0.01 — 1,720 Dust
From
Material
Movement
— — — — — — 1.38 1.38 — 0.67 0.67 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.51 0.43 3.81 4.02 0.01 0.17 — 0.17 0.16 — 0.16 — 711 711 0.03 0.01 — 714 412 N Oakhurst Drive Detailed Report, 8/1/2024
27 / 82
Dust
From
Material
Movement
— — — — — — 0.57 0.57 — 0.28 0.28 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.09 0.08 0.70 0.73 < 0.005 0.03 — 0.03 0.03 — 0.03 — 118 118 < 0.005 < 0.005 — 118 Dust
From
Material
Movement
— — — — — — 0.10 0.10 — 0.05 0.05 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.48 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 102 102 < 0.005 < 0.005 0.34 103 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.07 0.01 1.11 0.44 0.01 0.01 0.25 0.26 0.01 0.07 0.08 — 923 923 0.05 0.15 2.07 970 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.41 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 96.3 96.3 < 0.005 < 0.005 0.01 97.5 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.07 0.01 1.16 0.44 0.01 0.01 0.25 0.26 0.01 0.07 0.08 — 924 924 0.05 0.15 0.05 969 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.18 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 40.6 40.6 < 0.005 < 0.005 0.06 41.1 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 412 N Oakhurst Drive Detailed Report, 8/1/2024
28 / 82
Hauling 0.03 0.01 0.48 0.18 < 0.005 < 0.005 0.10 0.11 < 0.005 0.03 0.03 — 383 383 0.02 0.06 0.37 402 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 6.71 6.71 < 0.005 < 0.005 0.01 6.80 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 < 0.005 0.09 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 — 63.4 63.4 < 0.005 0.01 0.06 66.6
3.7. Building Construction (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.38 1.15 9.95 12.7 0.02 0.34 — 0.34 0.31 — 0.31 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.38 1.15 9.95 12.7 0.02 0.34 — 0.34 0.31 — 0.31 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.41 0.35 2.98 3.81 0.01 0.10 — 0.10 0.09 — 0.09 — 627 627 0.03 0.01 — 629 412 N Oakhurst Drive Detailed Report, 8/1/2024
29 / 82
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.08 0.06 0.54 0.70 < 0.005 0.02 — 0.02 0.02 — 0.02 — 104 104 < 0.005 < 0.005 — 104 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.21 0.18 0.19 3.23 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 678 678 0.03 0.02 2.29 688 Vendor 0.02 0.01 0.36 0.17 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 327 327 0.01 0.05 0.88 342 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.21 0.18 0.22 2.76 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 643 643 0.03 0.02 0.06 651 Vendor 0.02 0.01 0.38 0.18 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 327 327 0.01 0.05 0.02 341 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.07 0.86 0.00 0.00 0.19 0.19 0.00 0.05 0.05 — 195 195 0.01 0.01 0.30 198 Vendor 0.01 < 0.005 0.11 0.05 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 97.8 97.8 < 0.005 0.01 0.11 102 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.16 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 32.3 32.3 < 0.005 < 0.005 0.05 32.8 Vendor < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 — 16.2 16.2 < 0.005 < 0.005 0.02 16.9 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 412 N Oakhurst Drive Detailed Report, 8/1/2024
30 / 82
3.8. Building Construction (2026) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.38 1.15 9.95 12.7 0.02 0.34 — 0.34 0.31 — 0.31 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.38 1.15 9.95 12.7 0.02 0.34 — 0.34 0.31 — 0.31 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.41 0.35 2.98 3.81 0.01 0.10 — 0.10 0.09 — 0.09 — 627 627 0.03 0.01 — 629 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.08 0.06 0.54 0.70 < 0.005 0.02 — 0.02 0.02 — 0.02 — 104 104 < 0.005 < 0.005 — 104 412 N Oakhurst Drive Detailed Report, 8/1/2024
31 / 82
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.21 0.18 0.19 3.23 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 678 678 0.03 0.02 2.29 688 Vendor 0.02 0.01 0.36 0.17 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 327 327 0.01 0.05 0.88 342 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.21 0.18 0.22 2.76 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 643 643 0.03 0.02 0.06 651 Vendor 0.02 0.01 0.38 0.18 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 327 327 0.01 0.05 0.02 341 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.07 0.86 0.00 0.00 0.19 0.19 0.00 0.05 0.05 — 195 195 0.01 0.01 0.30 198 Vendor 0.01 < 0.005 0.11 0.05 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 97.8 97.8 < 0.005 0.01 0.11 102 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.16 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 32.3 32.3 < 0.005 < 0.005 0.05 32.8 Vendor < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 — 16.2 16.2 < 0.005 < 0.005 0.02 16.9 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.9. Building Construction (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
32 / 82
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Off-Roa
d
Equipm
ent
1.33 1.10 9.59 12.7 0.02 0.30 — 0.30 0.27 — 0.27 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.33 1.10 9.59 12.7 0.02 0.30 — 0.30 0.27 — 0.27 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.95 0.79 6.85 9.07 0.02 0.21 — 0.21 0.20 — 0.20 — 1,496 1,496 0.06 0.01 — 1,501 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.17 0.14 1.25 1.65 < 0.005 0.04 — 0.04 0.04 — 0.04 — 248 248 0.01 < 0.005 — 248 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
33 / 82
Worker 0.20 0.18 0.17 3.01 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 665 665 0.03 0.02 2.07 675 Vendor 0.02 0.01 0.34 0.16 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 320 320 0.01 0.04 0.84 335 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.20 0.17 0.22 2.55 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 630 630 0.01 0.02 0.05 638 Vendor 0.02 0.01 0.36 0.17 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 320 320 0.01 0.04 0.02 334 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.14 0.12 0.15 1.91 0.00 0.00 0.46 0.46 0.00 0.11 0.11 — 457 457 0.01 0.02 0.64 463 Vendor 0.02 0.01 0.26 0.12 < 0.005 < 0.005 0.06 0.07 < 0.005 0.02 0.02 — 229 229 0.01 0.03 0.26 239 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.03 0.02 0.03 0.35 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 75.7 75.7 < 0.005 < 0.005 0.11 76.6 Vendor < 0.005 < 0.005 0.05 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 37.9 37.9 < 0.005 0.01 0.04 39.5 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.10. Building Construction (2027) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.33 1.10 9.59 12.7 0.02 0.30 — 0.30 0.27 — 0.27 — 2,094 2,094 0.08 0.02 — 2,101 412 N Oakhurst Drive Detailed Report, 8/1/2024
34 / 82
Onsite 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 truck
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.33 1.10 9.59 12.7 0.02 0.30 — 0.30 0.27 — 0.27 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.95 0.79 6.85 9.07 0.02 0.21 — 0.21 0.20 — 0.20 — 1,496 1,496 0.06 0.01 — 1,501 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.17 0.14 1.25 1.65 < 0.005 0.04 — 0.04 0.04 — 0.04 — 248 248 0.01 < 0.005 — 248 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.20 0.18 0.17 3.01 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 665 665 0.03 0.02 2.07 675 Vendor 0.02 0.01 0.34 0.16 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 320 320 0.01 0.04 0.84 335 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
35 / 82
Worker 0.20 0.17 0.22 2.55 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 630 630 0.01 0.02 0.05 638 Vendor 0.02 0.01 0.36 0.17 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 320 320 0.01 0.04 0.02 334 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.14 0.12 0.15 1.91 0.00 0.00 0.46 0.46 0.00 0.11 0.11 — 457 457 0.01 0.02 0.64 463 Vendor 0.02 0.01 0.26 0.12 < 0.005 < 0.005 0.06 0.07 < 0.005 0.02 0.02 — 229 229 0.01 0.03 0.26 239 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.03 0.02 0.03 0.35 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 75.7 75.7 < 0.005 < 0.005 0.11 76.6 Vendor < 0.005 < 0.005 0.05 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 37.9 37.9 < 0.005 0.01 0.04 39.5 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.11. Building Construction (2028) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.28 1.06 9.23 12.7 0.02 0.26 — 0.26 0.24 — 0.24 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
36 / 82
Off-Roa 0.23 0.19 1.64 2.26 < 0.005 0.05 — 0.05 0.04 — 0.04 — 373 373 0.02 < 0.005 — 374 d
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.04 0.03 0.30 0.41 < 0.005 0.01 — 0.01 0.01 — 0.01 — 61.7 61.7 < 0.005 < 0.005 — 62.0 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.19 0.17 0.19 2.40 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 619 619 0.01 0.02 0.05 627 Vendor 0.02 0.01 0.34 0.16 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 313 313 0.01 0.04 0.02 326 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.45 0.00 0.00 0.12 0.12 0.00 0.03 0.03 — 112 112 < 0.005 < 0.005 0.14 113 Vendor < 0.005 < 0.005 0.06 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 — 55.7 55.7 < 0.005 0.01 0.06 58.2 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.08 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 18.5 18.5 < 0.005 < 0.005 0.02 18.8 Vendor < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 9.23 9.23 < 0.005 < 0.005 0.01 9.63 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.12. Building Construction (2028) - Mitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
37 / 82
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.28 1.06 9.23 12.7 0.02 0.26 — 0.26 0.24 — 0.24 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.23 0.19 1.64 2.26 < 0.005 0.05 — 0.05 0.04 — 0.04 — 373 373 0.02 < 0.005 — 374 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.04 0.03 0.30 0.41 < 0.005 0.01 — 0.01 0.01 — 0.01 — 61.7 61.7 < 0.005 < 0.005 — 62.0 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
38 / 82
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Worker 0.19 0.17 0.19 2.40 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 619 619 0.01 0.02 0.05 627 Vendor 0.02 0.01 0.34 0.16 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 313 313 0.01 0.04 0.02 326 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.45 0.00 0.00 0.12 0.12 0.00 0.03 0.03 — 112 112 < 0.005 < 0.005 0.14 113 Vendor < 0.005 < 0.005 0.06 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 — 55.7 55.7 < 0.005 0.01 0.06 58.2 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.08 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 18.5 18.5 < 0.005 < 0.005 0.02 18.8 Vendor < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 9.23 9.23 < 0.005 < 0.005 0.01 9.63 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.13. Architectural Coating (2028) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.13 0.11 0.81 1.12 < 0.005 0.02 — 0.02 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architect
ural
Coating
s
7.95 7.95 — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
39 / 82
Onsite 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 truck
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.02 0.01 0.10 0.13 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 15.7 15.7 < 0.005 < 0.005 — 15.8 Architect
ural
Coating
s
0.94 0.94 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
< 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 2.60 2.60 < 0.005 < 0.005 — 2.61 Architect
ural
Coating
s
0.17 0.17 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04 0.03 0.03 0.56 0.00 0.00 0.13 0.13 0.00 0.03 0.03 — 131 131 < 0.005 < 0.005 0.37 132 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 412 N Oakhurst Drive Detailed Report, 8/1/2024
40 / 82
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.06 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 14.8 14.8 < 0.005 < 0.005 0.02 15.0 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.45 2.45 < 0.005 < 0.005 < 0.005 2.48 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.14. Architectural Coating (2028) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.13 0.11 0.81 1.12 < 0.005 0.02 — 0.02 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architect
ural
Coating
s
7.95 7.95 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
41 / 82
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.02 0.01 0.10 0.13 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 15.7 15.7 < 0.005 < 0.005 — 15.8 Architect
ural
Coating
s
0.94 0.94 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
< 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 2.60 2.60 < 0.005 < 0.005 — 2.61 Architect
ural
Coating
s
0.17 0.17 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04 0.03 0.03 0.56 0.00 0.00 0.13 0.13 0.00 0.03 0.03 — 131 131 < 0.005 < 0.005 0.37 132 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.06 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 14.8 14.8 < 0.005 < 0.005 0.02 15.0 412 N Oakhurst Drive Detailed Report, 8/1/2024
42 / 82
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.45 2.45 < 0.005 < 0.005 < 0.005 2.48 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.94 0.85 0.60 7.15 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,811 1,811 0.08 0.07 5.01 1,839 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.94 0.85 0.60 7.15 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,811 1,811 0.08 0.07 5.01 1,839 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.93 0.84 0.66 6.60 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,736 1,736 0.09 0.07 0.13 1,760 412 N Oakhurst Drive Detailed Report, 8/1/2024
43 / 82
Enclose
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.93 0.84 0.66 6.60 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,736 1,736 0.09 0.07 0.13 1,760 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.16 0.14 0.11 1.17 < 0.005 < 0.005 0.29 0.29 < 0.005 0.07 0.08 — 276 276 0.01 0.01 0.34 281 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.16 0.14 0.11 1.17 < 0.005 < 0.005 0.29 0.29 < 0.005 0.07 0.08 — 276 276 0.01 0.01 0.34 281
4.1.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.94 0.85 0.60 7.15 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,811 1,811 0.08 0.07 5.01 1,839 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.94 0.85 0.60 7.15 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,811 1,811 0.08 0.07 5.01 1,839 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
44 / 82
Apartme 0.93 0.84 0.66 6.60 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,736 1,736 0.09 0.07 0.13 1,760 nts
Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.93 0.84 0.66 6.60 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,736 1,736 0.09 0.07 0.13 1,760 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.16 0.14 0.11 1.17 < 0.005 < 0.005 0.29 0.29 < 0.005 0.07 0.08 — 276 276 0.01 0.01 0.34 281 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.16 0.14 0.11 1.17 < 0.005 < 0.005 0.29 0.29 < 0.005 0.07 0.08 — 276 276 0.01 0.01 0.34 281
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 323 323 0.02 < 0.005 — 324
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — — 209 209 0.01 < 0.005 — 210
412 N Oakhurst Drive Detailed Report, 8/1/2024
45 / 82
Total — — — — — — — — — — — — 532 532 0.04 0.01 — 535
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 323 323 0.02 < 0.005 — 324
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — — 209 209 0.01 < 0.005 — 210
Total — — — — — — — — — — — — 532 532 0.04 0.01 — 535
Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 53.5 53.5 < 0.005 < 0.005 — 53.7 Enclose
d
Parking
with
Elevator
— — — — — — — — — — — — 34.7 34.7 < 0.005 < 0.005 — 34.8 Total — — — — — — — — — — — — 88.1 88.1 0.01 < 0.005 — 88.6
4.2.2. Electricity Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 323 323 0.02 < 0.005 — 324
412 N Oakhurst Drive Detailed Report, 8/1/2024
46 / 82
Enclose — — — — — — — — — — — — 209 209 0.01 < 0.005 — 210 d
Parking
with
Elevator
Total — — — — — — — — — — — — 532 532 0.04 0.01 — 535
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 323 323 0.02 < 0.005 — 324
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — — 209 209 0.01 < 0.005 — 210
Total — — — — — — — — — — — — 532 532 0.04 0.01 — 535
Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 53.5 53.5 < 0.005 < 0.005 — 53.7 Enclose
d
Parking
with
Elevator
— — — — — — — — — — — — 34.7 34.7 < 0.005 < 0.005 — 34.8 Total — — — — — — — — — — — — 88.1 88.1 0.01 < 0.005 — 88.6
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
47 / 82
Apartme
Mid Rise
0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
< 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 27.4 27.4 < 0.005 < 0.005 — 27.5 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 27.4 27.4 < 0.005 < 0.005 — 27.5
4.2.4. Natural Gas Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 412 N Oakhurst Drive Detailed Report, 8/1/2024
48 / 82
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Apartme
nts
Mid Rise
0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
< 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 27.4 27.4 < 0.005 < 0.005 — 27.5 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 27.4 27.4 < 0.005 < 0.005 — 27.5
4.3. Area Emissions by Source
412 N Oakhurst Drive Detailed Report, 8/1/2024
49 / 82
4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 2.93 1.45 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Consum
er
Product
s
1.17 1.17 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.09 0.09 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
0.50 0.47 0.04 4.26 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 13.3 13.3 < 0.005 < 0.005 — 13.3 Total 4.70 3.18 1.02 17.3 0.05 1.89 — 1.89 1.82 — 1.82 307 999 1,306 1.45 < 0.005 — 1,342 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 2.93 1.45 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Consum
er
Product
s
1.17 1.17 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.09 0.09 — — — — — — — — — — — — — — — —
Total 4.19 2.71 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Annual — — — — — — — — — — — — — — — — — —
Hearths 0.04 0.02 0.01 0.16 < 0.005 0.02 — 0.02 0.02 — 0.02 3.48 11.2 14.7 0.02 < 0.005 — 15.1 412 N Oakhurst Drive Detailed Report, 8/1/2024
50 / 82
Consum
Products
0.21 0.21 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.02 0.02 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
0.06 0.06 < 0.005 0.53 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.50 1.50 < 0.005 < 0.005 — 1.51 Total 0.33 0.31 0.02 0.70 < 0.005 0.02 — 0.02 0.02 — 0.02 3.48 12.7 16.2 0.02 < 0.005 — 16.6
4.3.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 2.93 1.45 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Consum
er
Product
s
1.17 1.17 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.09 0.09 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
0.50 0.47 0.04 4.26 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 13.3 13.3 < 0.005 < 0.005 — 13.3 Total 4.70 3.18 1.02 17.3 0.05 1.89 — 1.89 1.82 — 1.82 307 999 1,306 1.45 < 0.005 — 1,342 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 2.93 1.45 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 412 N Oakhurst Drive Detailed Report, 8/1/2024
51 / 82
Consum
Products
1.17 1.17 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.09 0.09 — — — — — — — — — — — — — — — —
Total 4.19 2.71 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Annual — — — — — — — — — — — — — — — — — —
Hearths 0.04 0.02 0.01 0.16 < 0.005 0.02 — 0.02 0.02 — 0.02 3.48 11.2 14.7 0.02 < 0.005 — 15.1 Consum
er
Product
s
0.21 0.21 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.02 0.02 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
0.06 0.06 < 0.005 0.53 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.50 1.50 < 0.005 < 0.005 — 1.51 Total 0.33 0.31 0.02 0.70 < 0.005 0.02 — 0.02 0.02 — 0.02 3.48 12.7 16.2 0.02 < 0.005 — 16.6
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1
412 N Oakhurst Drive Detailed Report, 8/1/2024
52 / 82
Enclose
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 0.61 4.15 4.76 0.06 < 0.005 — 6.80 Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 0.61 4.15 4.76 0.06 < 0.005 — 6.80
4.4.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
53 / 82
Apartme — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 nts
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 0.61 4.15 4.76 0.06 < 0.005 — 6.80 Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 0.61 4.15 4.76 0.06 < 0.005 — 6.80
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 412 N Oakhurst Drive Detailed Report, 8/1/2024
54 / 82
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 3.43 0.00 3.43 0.34 0.00 — 12.0
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.43 0.00 3.43 0.34 0.00 — 12.0 412 N Oakhurst Drive Detailed Report, 8/1/2024
55 / 82
4.5.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 3.43 0.00 3.43 0.34 0.00 — 12.0
412 N Oakhurst Drive Detailed Report, 8/1/2024
56 / 82
Enclose — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00 d
Parking
with
Elevator
Total — — — — — — — — — — — 3.43 0.00 3.43 0.34 0.00 — 12.0
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 0.39 0.39
Total — — — — — — — — — — — — — — — — 0.39 0.39
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 0.39 0.39
Total — — — — — — — — — — — — — — — — 0.39 0.39
Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 0.06 0.06
Total — — — — — — — — — — — — — — — — 0.06 0.06
4.6.2. Mitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
57 / 82
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 0.39 0.39
Total — — — — — — — — — — — — — — — — 0.39 0.39
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 0.39 0.39
Total — — — — — — — — — — — — — — — — 0.39 0.39
Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 0.06 0.06
Total — — — — — — — — — — — — — — — — 0.06 0.06
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
58 / 82
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.7.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
59 / 82
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 412 N Oakhurst Drive Detailed Report, 8/1/2024
60 / 82
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.9.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 412 N Oakhurst Drive Detailed Report, 8/1/2024
61 / 82
Vegetati TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e on
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 412 N Oakhurst Drive Detailed Report, 8/1/2024
62 / 82
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
63 / 82
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
64 / 82
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
65 / 82
Sequest — — — — — — — — — — — — — — — — — —
ered
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 10/1/2025 11/30/2025 5.00 43.0 —
Grading Grading 12/1/2025 7/31/2026 5.00 175 —
Building Construction Building Construction 8/1/2026 3/31/2028 5.00 435 — Architectural Coating Architectural Coating 4/1/2028 5/31/2028 5.00 43.0 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Tractors/Loaders/Back
hoes
Diesel Average 2.00 6.00 84.0 0.37
Demolition Rubber Tired Dozers Diesel Average 1.00 1.00 367 0.40 Demolition Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Demolition Excavators Diesel Average 1.00 8.00 36.0 0.38 Grading Graders Diesel Average 1.00 6.00 148 0.41
Grading Rubber Tired Dozers Diesel Average 1.00 6.00 367 0.40 412 N Oakhurst Drive Detailed Report, 8/1/2024
66 / 82
Grading Tractors/Loaders/Back Diesel Average 1.00 7.00 84.0 0.37 Building Construction Cranes Diesel Average 1.00 4.00 367 0.29 Building Construction Forklifts Diesel Average 2.00 6.00 82.0 0.20 Building Construction Tractors/Loaders/Back
hoes
Diesel Average 2.00 8.00 84.0 0.37
Building Construction Air Compressors Diesel Average 1.00 8.00 37.0 0.48 Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 Building Construction Welders Diesel Average 1.00 8.00 46.0 0.45 Building Construction Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Building Construction Cement and Mortar
Mixers
Diesel Average 1.00 8.00 10.0 0.56
Architectural Coating Air Compressors Diesel Average 1.00 6.00 37.0 0.48
5.2.2. Mitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Tractors/Loaders/Back
hoes
Diesel Average 2.00 6.00 84.0 0.37
Demolition Rubber Tired Dozers Diesel Average 1.00 1.00 367 0.40 Demolition Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Demolition Excavators Diesel Average 1.00 8.00 36.0 0.38 Grading Graders Diesel Average 1.00 6.00 148 0.41
Grading Rubber Tired Dozers Diesel Average 1.00 6.00 367 0.40 Grading Tractors/Loaders/Back
hoes
Diesel Average 1.00 7.00 84.0 0.37
Building Construction Cranes Diesel Average 1.00 4.00 367 0.29 Building Construction Forklifts Diesel Average 2.00 6.00 82.0 0.20 Building Construction Tractors/Loaders/Back
hoes
Diesel Average 2.00 8.00 84.0 0.37
Building Construction Air Compressors Diesel Average 1.00 8.00 37.0 0.48 412 N Oakhurst Drive Detailed Report, 8/1/2024
67 / 82
Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 Building Construction Welders Diesel Average 1.00 8.00 46.0 0.45 Building Construction Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Building Construction Cement and Mortar
Mixers
Diesel Average 1.00 8.00 10.0 0.56
Architectural Coating Air Compressors Diesel Average 1.00 6.00 37.0 0.48
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition — — — —
Demolition Worker 12.5 18.5 LDA,LDT1,LDT2
Demolition Vendor — 10.2 HHDT,MHDT
Demolition Hauling 8.67 20.0 HHDT
Demolition Onsite truck — — HHDT
Grading — — — —
Grading Worker 7.50 18.5 LDA,LDT1,LDT2
Grading Vendor — 10.2 HHDT,MHDT
Grading Hauling 13.6 20.0 HHDT
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 50.0 18.5 LDA,LDT1,LDT2
Building Construction Vendor 10.5 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck — — HHDT
Architectural Coating — — — —
Architectural Coating Worker 10.0 18.5 LDA,LDT1,LDT2
412 N Oakhurst Drive Detailed Report, 8/1/2024
68 / 82
Architectural Coating Vendor — 10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT
5.3.2. Mitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition — — — —
Demolition Worker 12.5 18.5 LDA,LDT1,LDT2
Demolition Vendor — 10.2 HHDT,MHDT
Demolition Hauling 8.67 20.0 HHDT
Demolition Onsite truck — — HHDT
Grading — — — —
Grading Worker 7.50 18.5 LDA,LDT1,LDT2
Grading Vendor — 10.2 HHDT,MHDT
Grading Hauling 13.6 20.0 HHDT
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 50.0 18.5 LDA,LDT1,LDT2
Building Construction Vendor 10.5 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck — — HHDT
Architectural Coating — — — —
Architectural Coating Worker 10.0 18.5 LDA,LDT1,LDT2
Architectural Coating Vendor — 10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT
412 N Oakhurst Drive Detailed Report, 8/1/2024
69 / 82
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 110,603 36,868 0.00 0.00 —
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (Cubic
Yards)
Material Exported (Cubic
Yards)
Acres Graded (acres) Material Demolished (Building
Square Footage)
Acres Paved (acres)
Demolition 0.00 0.00 0.00 32,400 —
Grading — 19,000 131 0.00 —
5.6.2. Construction Earthmoving Control Strategies
Non-applicable. No control strategies activated by user.
5.7. Construction Paving
Land Use Area Paved (acres) % Asphalt
Apartments Mid Rise — 0%
Enclosed Parking with Elevator 0.00 100%
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
412 N Oakhurst Drive Detailed Report, 8/1/2024
70 / 82
2025 0.00 690 0.05 0.01
2026 0.00 690 0.05 0.01
2027 0.00 690 0.05 0.01
2028 0.00 690 0.05 0.01
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Apartments Mid
Rise
283 255 213 98,154 2,383 2,150 1,791 826,698
Enclosed Parking
with Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Apartments Mid
Rise
283 255 213 98,154 2,383 2,150 1,791 826,698
Enclosed Parking
with Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
Hearth Type Unmitigated (number)
Apartments Mid Rise —
Wood Fireplaces 0
Gas Fireplaces 47
412 N Oakhurst Drive Detailed Report, 8/1/2024
71 / 82
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 5
Conventional Wood Stoves 0
Catalytic Wood Stoves 3
Non-Catalytic Wood Stoves 3
Pellet Wood Stoves 0
5.10.1.2. Mitigated
Hearth Type Unmitigated (number)
Apartments Mid Rise —
Wood Fireplaces 0
Gas Fireplaces 47
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 5
Conventional Wood Stoves 0
Catalytic Wood Stoves 3
Non-Catalytic Wood Stoves 3
Pellet Wood Stoves 0
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq
ft)
Residential Exterior Area Coated (sq
ft)
Non-Residential Interior Area Coated
(sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
110603.47499999999 36,868 0.00 0.00 —
5.10.3. Landscape Equipment
412 N Oakhurst Drive Detailed Report, 8/1/2024
72 / 82
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.10.4. Landscape Equipment - Mitigated
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Apartments Mid Rise 170,742 690 0.0489 0.0069 516,119
Enclosed Parking with
Elevator
110,743 690 0.0489 0.0069 0.00
5.11.2. Mitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Apartments Mid Rise 170,742 690 0.0489 0.0069 516,119
Enclosed Parking with
Elevator
110,743 690 0.0489 0.0069 0.00
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
73 / 82
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Apartments Mid Rise 1,938,238 8,193
Enclosed Parking with Elevator 0.00 0.00
5.12.2. Mitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Apartments Mid Rise 1,938,238 8,193
Enclosed Parking with Elevator 0.00 0.00
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Apartments Mid Rise 38.5 —
Enclosed Parking with Elevator 0.00 —
5.13.2. Mitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Apartments Mid Rise 38.5 —
Enclosed Parking with Elevator 0.00 —
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Apartments Mid Rise Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
412 N Oakhurst Drive Detailed Report, 8/1/2024
74 / 82
Apartments Mid Rise Household
refrigerators and/or
freezers
R-134a 1,430 0.12 0.60 0.00 1.00
5.14.2. Mitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Apartments Mid Rise Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Apartments Mid Rise Household
refrigerators and/or
freezers
R-134a 1,430 0.12 0.60 0.00 1.00
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.15.2. Mitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor
5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr) Daily Heat Input (MMBtu/day) Annual Heat Input (MMBtu/yr) 412 N Oakhurst Drive Detailed Report, 8/1/2024
75 / 82
5.17. User Defined
Equipment Type Fuel Type
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
5.18.2.2. Mitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
76 / 82
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 7.73 annual days of extreme heat Extreme Precipitation 7.05 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.30 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
412 N Oakhurst Drive Detailed Report, 8/1/2024
77 / 82
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. 412 N Oakhurst Drive Detailed Report, 8/1/2024
78 / 82
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 57.8
AQ-PM 65.4
AQ-DPM 78.6
Drinking Water 94.3
Lead Risk Housing 16.4
Pesticides 0.00
Toxic Releases 74.1
Traffic 51.1
Effect Indicators —
CleanUp Sites 59.3
Groundwater 36.2
Haz Waste Facilities/Generators 62.6
Impaired Water Bodies 0.00
Solid Waste 73.0
Sensitive Population —
Asthma 15.2
Cardio-vascular 40.3
Low Birth Weights 36.1
Socioeconomic Factor Indicators —
Education 24.6
Housing 81.8
Linguistic 37.0
Poverty 30.8
Unemployment 22.6
7.2. Healthy Places Index Scores
412 N Oakhurst Drive Detailed Report, 8/1/2024
79 / 82
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 50.72500962
Employed 91.65918132
Median HI 45.06608495
Education —
Bachelor's or higher 95.30347748
High school enrollment 100
Preschool enrollment 86.52636982
Transportation —
Auto Access 42.10188631
Active commuting 67.66328757
Social —
2-parent households 0.128320287
Voting 28.84640062
Neighborhood —
Alcohol availability 38.77839086
Park access 4.59386629
Retail density 99.30707045
Supermarket access 94.25125112
Tree canopy 23.49544463
Housing —
Homeownership 14.5515206
Housing habitability 16.68163737
Low-inc homeowner severe housing cost burden 1.539843449 Low-inc renter severe housing cost burden 76.08109842
Uncrowded housing 96.93314513
Health Outcomes —
412 N Oakhurst Drive Detailed Report, 8/1/2024
80 / 82
Insured adults 84.88387014
Arthritis 63.4
Asthma ER Admissions 81.1
High Blood Pressure 70.1
Cancer (excluding skin) 18.5
Asthma 65.7
Coronary Heart Disease 63.8
Chronic Obstructive Pulmonary Disease 79.3
Diagnosed Diabetes 91.9
Life Expectancy at Birth 87.6
Cognitively Disabled 15.9
Physically Disabled 9.6
Heart Attack ER Admissions 65.5
Mental Health Not Good 80.9
Chronic Kidney Disease 79.8
Obesity 76.5
Pedestrian Injuries 84.5
Physical Health Not Good 85.2
Stroke 70.4
Health Risk Behaviors —
Binge Drinking 24.0
Current Smoker 84.4
No Leisure Time for Physical Activity 94.8
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 98.7
Elderly 18.9
412 N Oakhurst Drive Detailed Report, 8/1/2024
81 / 82
English Speaking 44.9
Foreign-born 59.3
Outdoor Workers 98.2
Climate Change Adaptive Capacity —
Impervious Surface Cover 6.3
Traffic Density 62.4
Traffic Access 87.4
Other Indices —
Hardship 7.1
Other Decision Support —
2016 Voting 23.3
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 44.0 Healthy Places Index Score for Project Location (b) 55.0 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
412 N Oakhurst Drive Detailed Report, 8/1/2024
82 / 82
8. User Changes to Default Data
Screen Justification
Land Use Total site acreage 0.35-acre
Construction: Construction Phases Per construction questionnaire Construction: Off-Road Equipment Per construction questionnaire Operations: Hearths SCAQMD Rule 445
Construction: Architectural Coatings SCAQMD Rule 1113
5 Hutton Centre Drive, Suite 500, Santa Ana, CA 92707
Office: 949.472.3505 | Fax: 949.472.8373
M E M O R A N D U M
To: Kristen Bogue, Michael Baker International
From: Zhe Chen, Michael Baker International
Date: September 27, 2024
Subject: Oakhurst Apartments Project – Greenhouse Gas Emissions Technical Memorandum
PURPOSE
The purpose of this technical memorandum is to evaluate potential greenhouse gas (GHG) impacts resulting from the construction and operation of the proposed Oakhurst Apartments Project (project), located in the Cities of Los Angeles and Beverly Hills, California.
PROJECT LOCATION
The community of Beverly Grove is a neighborhood within the City of Los Angeles, regionally located in the western portion of Los Angeles County (County), approximately six miles west of Downtown Los Angeles; refer to Exhibit 1, Regional Vicinity Map. Surrounding communities include Hollywood to the north, Silverlake-Echo Park and Westlake to the east, South Central Los Angeles and West Adams-LeimertBaldwin Hills to the south, and West Los Angeles to the west. The City of Beverly Hills is roughly 5.7 square miles and located in the southwestern portion of the County, approximately 8.5 miles northwest of Downtown Los Angeles. Surrounding jurisdictions include the City of Los Angeles along all sides and the City of West Hollywood to the east.
The project site is specifically located at 412 North Oakhurst Drive within the Cities of Los Angeles and Beverly Hills. As shown on Exhibit 2, Site Vicinity, the site encompasses approximately 0.35-acre (0.10- acre within Beverly Hills and 0.25-acre within Los Angeles) bordered to the west by North Oakhurst Drive.
Surrounding land uses generally include residential uses on all sides. Regional access to the site is provided via State Route 2 (SR-2; Santa Monica Boulevard), Interstate 10 (I-10), State Route 187 (SR-187; Venice Boulevard), and Interstate 405 (I-405). Local access to the site is provided via Beverly Boulevard, Burton Way, South Doheny Drive, and North Oakhurst Drive.
EXISTING SITE CONDITIONS
The project site is currently developed with an existing occupied multi-family residential building located at 412 North Oakhurst Drive within the portion of the lot located within the City of Beverly Hills (within Beverly Hills; Assessor’s Parcel Number [APN] 4335-006-043) and within the portion of the lot located within the City of Los Angeles (within Los Angeles; APN 4335-006-044). The existing residential building is approximately 32,400-gross square feet and includes 15 residential units that are a maximum of three Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 2
stories.1 According to the General Plan Land Use Designations – City of Beverly Hills (Beverly Hills General Plan Land Use Map) and General Plan Land Use Map, Wilshire Community Plan (Los Angeles General Plan Land Use Map), the project site is currently designated Multi-Family Residential, High Density (within the portion of the lot located within the City of Beverly Hills) and High Medium Residential (within the portion of the lot located within the City of Los Angeles).2,3 The on-site designations allow for a maximum density of 50 dwelling units per acre (du/acre) on the portion of the lot located within the City of Beverly Hills and between 55 and 109 du/acre on the portion of the lot located within the City of Beverly Hills. Additionally, the portion of the lot located within the City of Beverly Hills allows for a 60-foot maximum building height.
Lot 2 does not designate a maximum building height. The City of Beverly Hills portion of the lot is zoned Multiple Residential Zone (R-4) and the City of Los Angeles portion of the lot is zoned Qualified Classification, Multiple Dwelling Zone, Height District No. 1, Oil Drilling District ([Q]R4-1-O).
Surrounding uses adjacent to the project site include residential land uses. The project site is located within walking distance of single-family homes, condominiums and apartments, as well as offices, retail stores, restaurants, and other commercial businesses along Beverly Boulevard.
PROJECT DESCRIPTION
The proposed project would involve demolishing the existing 15-unit multi-family residential building and associated parking garage and constructing a new multi-family residential (apartment) building (up to eight stories in height), landscaping, open space, and two levels of basement parking; refer to Exhibit 3, Site Plan. The building would include 52 residential units (12 residential units within the City of Beverly Hills and 40 units within the City of Los Angeles). The residential unit options would include studios through three-bedroom units. The proposed building would include common open space amenities including: a trash room, recycling room, mail room, and long-term bicycle storage room located on the first floor; a bicycle parking/maintenance room and a landscaped outdoor courtyard located on the second floor; a recreation room located on the third floor; a gym located on the fourth floor; and common space located on the fifth floor. The rooftop would include screened mechanical equipment and an area reserved for future solar panel use. Ancillary facilities, such as an elevator lobby, elevators, and stairs are also proposed.
The two basement parking levels would accommodate 66 standard parking spaces (18 standard spaces within the City of Beverly Hills and 48 standard spaces within the City of Los Angeles). Bicycle parking/storage, various utility related rooms (i.e., mechanical and electrical), and storage facilities would also be located on the basement levels. Total parking spaces, including parking at grade within the City of Los Angeles, would be 75.
Construction activities would include demolition, grading, building construction, and the application of architectural coatings. Construction activities and would occur over approximately 32 months, beginning 1 “Gross” (square feet) is used to describe the total area of enclosed space measured from the exterior walls of a building, including unusable spaces (e.g., areas between walls, structural columns, or shafts); “net” (square feet) is used to describe the total area of enclosed space measured from the inside finished surface of surrounding walls that is available for furnishing, equipment, and personnel and excludes any unusable spaces. 2 City of Beverly Hills, General Plan Land Use Designations – City of Beverly Hills, https://www.beverlyhills.org/cbhfiles/storage/files/1807037749744115284/Landuse_11x17_20220125.pdf, accessed July 8, 2024. 3City of Los Angeles, General Plan Land Use Map, Wilshire Community Map, https://planning.lacity.gov/odocument/2ec22248- 3c1e-4354-b5d1-096cdf9845ab/wilplanmap.pdf, accessed July 8, 2024.
OAKHURST APARTMENTS PROJECT
GREENHOUSE GAS EMISSIONS TECHNICAL MEMORANDUM
Exhibit 1
Regional Vicinity NOT TO SCALE
08/2024 • JN 199941
P A C I F I C
O C E A N
Pyramid
Lake
Lake
Piru
Castaic
Lake
101
101
1 1
2 1
5 5
5 126
118 118
241
142
134
261
133
138
138
138
405
405
605
710
110
110
10 10
210
210
210
10 405
23 2
2 14
14 18
23 23
27 55
91 90
90 57
60 60
30 71
22 Upland
Pomona
Chino
Palmdale
Lancaster
Pasadena
Alhambra
Monterey Park
Pico
Rivera
Downey
South
Gate
Compton
Carson
Hawthorne
Inglewood
Culver
City
Santa
Monica
Sherman
Oaks
Van
Nuys
Hollywood
Bellflower
Lakewood
Arcadia
Monrovia Azuza
Claremont
San
Dimas
West
Covina
La Habra
Heights
Brea
Walnut
Covina Baldwin
Park
Whittier
La
Mirada
Burbank
Pacoima
Glendale
Los
Angeles
Torrance
San
Pedro
Long
Beach
Huntington
Beach
Newport Beach
Santa
Ana
Costa
Mesa
Garden
Grove
Anaheim
Tustin
Orange
Fullerton
Yorba
Linda
Irvine
Lake
Forest
Fillmore Piru
Moorpark
Thousand
Oaks
Simi
Valley
Castaic
Gorman
Lebec
Santa
Clarita
Sylmar
Agoura Hills Woodland
Hills
Canoga
Park
Chatsworth
Westlake
Village
Calabasas
Malibu
Palos
Verdes
Estates
Redondo Beach
Manhattan Beach
El Segundo
Playa Del Rey
Marina
Del Rey
Beverly
Hills
ORANGE
COUNTY
VENTURA
COUNTY
LOS ANGELES
COUNTY
KERN COUNTY
PROJECT
SITE
OAKHURST APARTMENTS PROJECT
GREENHOUSE GAS EMISSIONS TECHNICAL MEMORANDUM
Exhibit 2
Site Vicinity
Source: Google Earth Pro, August 2024
NOT TO SCALE
08/2024 • JN 199941
OAKHURST DR
N DOHENY DR
PALM DR
PROJECT SITE
OAKHURST APARTMENTS PROJECT
GREENHOUSE GAS EMISSIONS TECHNICAL MEMORANDUM
Exhibit 3
Site Plan
Source: SPF: architects, August 2024
NOT TO SCALE
08/2024 • JN 199941
DN
2 A
E
1 6
C
3 4 5
D
8 B
PROPOSED 8-STORY
MULTIFAMILY BUILDING W/ TWO
LEVELS SUBTERRANEAN PARKING CITY OF BEVERLY HILLS
JURISDICTION
PUBLIC RIGHT OF
WAY
PROJECT SITE
CL OF ALLEY
TRANSFORMER
PL (102'-7 3/4")
PL (149' - 11 1/2")
PL (102'-7 3/4")
PL (149' - 11 1/2")
BASEMENT PARKINGDRIVEWAYENTRANCE + EXIT
LABH
LABH
LOS ANGELES
OUTLINE OF EXISTING
BUILDING TO BE
DEMOLISHED
OAKHURST DR.
PAVING
PLANTING - SEE
LANDSCAPE DWGS
PLANTED PARKWAY
TO REMAIN
LEGEND
LEVEL 01 PARKINGENTRANCE + EXIT
5'-0" OFFSET LINE
FROM BUILDING
100.25' LOWEST ADJ.
GRADE WITHIN 5' OF
BUILDING LINE
FDC SIAMESE CONNECTION
(E) STREET TREE TO REMAIN (4)
SIDEWALK TO BE REMOVED
AND REPLACED PER CITY
STANDARDS
PLANTED PARKWAY TO REMAIN
DRIVEWAY CURB CUT TO BE
REMOVED AND REPLACED
WITH PLANTING
PUBLIC RIGHT
OF WAY
PROJECT SITE
SETBACK
15' - 0" 27' - 7" 107' - 5"
BEVERLY HILLS
42' - 7"
CITY OF LA
107' - 5"
SETBACK
9' - 0" 84' - 8"
SETBACK
9' - 0"
PLANTER WALL PER
LANDSCAPE - SHALL COMPLY
WITH 10-3-2814, PLASTER
FINISH ON BOTH SIDES,
TYPICAL
EGRESS PATH
3' - 8" 70' - 2" 5' - 0" 19' - 7"
EGRESS PATH
3' - 8"
PLANTING TO PROVIDE
PRIVATE DECK SCREENING.
SEE LANDSCAPE ELEVATION
PLANTING TO PROVIDE
PRIVATE DECK SCREENING.
SEE LANDSCAPE ELEVATION
THIRD PAVED WALKWAY
TO EGRESS STAIRS
BUILDING ENTRY
(WALKWAY 1)
EGRESS PATH
(WALKWAY 2)
EGRESS PATH
(WALKWAY 3)
6' - 0"
1 A 403
____
1 A 402
____
1 A 401
____
1 A 400
____
6"
6"
TREES PER LANDSCAPE
TREES PER LANDSCAPE
REV. ISSUE
DRAWN BY:
PROJECT NO
CHECKED BY
SCALE:
SHEET NO:
HALF SC
NORTH
A 1
OAKHURST APARTMENTS
SITE PLAN
1 SCALE: 1/8" = 1'-0"
SITE PLAN - BH
1 SB330 SUBMITT
2 SB330 RESUBM
3 SB330 RESUBM
4 SB330 RESUBM
5 SB330 RESUBM
6 SB330 RESUBM
7 SB330 RESUBM
8 SB330 RESUBM
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 6
in approximately October 2025 and ending May 2028. The proposed earthwork would result in approximately 19,000 cubic yards of soil export and demolition of approximately 32,400-gross square feet of an existing residential building.
Global Climate Change
California is a substantial contributor of global greenhouse gases (GHGs), emitting over 381.3 million metric tons of carbon dioxide equivalent (MTCO2e) in 2021.4 Methane (CH4) is also an important GHG that potentially contributes to global climate change. GHGs are global in their effect, which is to increase the earth’s ability to absorb heat in the atmosphere. As primary GHGs have a long lifetime in the atmosphere, accumulate over time, and are generally well-mixed, their impact on the atmosphere is mostly independent of the point of emission. Every nation emits GHGs and as a result makes an incremental cumulative contribution to global climate change; therefore, global cooperation will be required to reduce the rate of GHG emissions enough to slow or stop the human-caused increase in average global temperatures and associated changes in climatic conditions.
The impact of human activities on global climate change is apparent in the observational record. Air trapped by ice has been extracted from core samples taken from polar ice sheets to determine the global atmospheric variation of CO2, CH4, and nitrous oxide (N2O) from before the start of industrialization (approximately 1750), to over 650,000 years ago. For that period, it was found that CO2 concentrations ranged from 180 to 300 parts per million (ppm). For the period from approximately 1750 to the present, global CO2 concentrations increased from a pre-industrialization period concentration of 280 to 379 ppm in 2005, with the 2005 value far exceeding the upper end of the pre-industrial period range. As of July 2024, the highest monthly average concentration of CO2 in the atmosphere was recorded at 427 ppm.5 The Intergovernmental Panel on Climate Change (IPCC) constructed several emission trajectories of GHGs needed to stabilize global temperatures and climate change impacts. It concluded that a stabilization of GHGs at 400 to 450 ppm carbon dioxide equivalent (CO2e)6 concentration is required to keep global mean warming below 2 degrees Celsius (ᵒC), which in turn is assumed to be necessary to avoid dangerous climate change.
REGULATORY SETTING
State
Various Statewide and local initiatives to reduce the State’s contribution to GHG emissions have raised awareness that, even though the various contributors to and consequences of global climate change are not yet fully understood, global climate change is under way, and there is a real potential for severe adverse environmental, social, and economic effects in the long term.
Assembly Bill 32 (California Global Warming Solutions Act of 2006). California passed the California Global Warming Solutions Act of 2006 (AB 32; California Health and Safety Code Division 25.5, Sections 38500 - 38599). AB 32 establishes regulatory, reporting, and market mechanisms to achieve quantifiable 4 California Air Resources Board, California Greenhouse Gas Emissions for 2000 to 2021, https://ww2.arb.ca.gov/ghginventory-data, accessed July 31, 2024. 5 Scripps Institution of Oceanography, Carbon Dioxide Concentration at Mauna Loa Observatory, https://scripps.ucsd.edu/programs/keelingcurve/, accessed July 31, 2024. 6 Carbon Dioxide Equivalent (CO2e) – A metric measure used to compare the emissions from various greenhouse gases based upon their global warming potential.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 7
reductions in GHG emissions and establishes a cap on Statewide GHG emissions. AB 32 requires that Statewide GHG emissions be reduced to 1990 levels by 2020. AB 32 specifies that regulations adopted in response to AB 1493 should be used to address GHG emissions from vehicles. However, AB 32 also includes language stating that if the AB 1493 regulations cannot be implemented, then the California Air Resources Board (CARB) should develop new regulations to control vehicle GHG emissions under the authorization of AB 32.
Executive Order S-3-05. Executive Order S-3-05 set forth a series of target dates by which Statewide emissions of GHGs would be progressively reduced, as follows:
• By 2010, reduce GHG emissions to 2000 levels;
• By 2020, reduce GHG emissions to 1990 levels; and
• By 2050, reduce GHG emissions to 80 percent below 1990 levels.
The Executive Order directed the California Environmental Protection Agency (CalEPA) Secretary to coordinate a multi-agency effort to reduce GHG emissions to the target levels. The Secretary is required to submit biannual reports to the Governor and California Legislature describing the progress made toward the emissions targets, the impacts of global climate change on California’s resources, and mitigation and adaptation plans to combat these impacts. To comply with Executive Order S-3-05, the CalEPA Secretary created the California Climate Action Team, made up of members from various State agencies and commissions. The Climate Action Team released its first report in March 2006, which proposed to achieve the targets by building on the voluntary actions of California businesses, local governments, and communities and through State incentive and regulatory programs.
Senate Bill 32. Signed into law on September 2016, SB 32 codifies the 2030 GHG reduction target in Executive Order B-30-15 (40 percent below 1990 levels by 2030). The bill authorizes CARB to adopt an interim GHG emissions level target to be achieved by 2030.
CARB Scoping Plan. On December 11, 2008, CARB adopted the Climate Change Scoping Plan (Scoping Plan), which functions as a roadmap to achieve GHG reductions in California required by AB 32 through subsequently enacted regulations. The Scoping Plan contains the main strategies California will implement to reduce GHG emissions by 174 million metric tons (MT), or approximately 30 percent, from the State’s projected 2020 emissions level of 596 million MTCO2e under a business as usual (BAU)7 scenario. This is a reduction of 42 million MTCO2e, or almost ten percent, from 2002 to 2004 average emissions, but requires the reductions in the face of population and economic growth through 2020.
The Scoping Plan calculates 2020 BAU emissions as the emissions that would be expected to occur in the absence of any GHG reduction measures. The 2020 BAU emissions estimate was derived by projecting emissions from a past baseline year using growth factorsspecific to each of the different economic sectors (e.g., transportation, electrical power, commercial and residential, industrial, etc.). CARB used three-year average emissions, by sector, for 2002 to 2004 to forecast emissions to 2020. The measures described in the Scoping Plan are intended to reduce the projected 2020 BAU to 1990 levels, as required by AB 32. 7 “Business as Usual” refers to emissions that would be expected to occur in the absence of GHG reductions; refer to http://www.arb.ca.gov/cc/inventory/data/bau.htm. Note that there is significant controversy as to what BAU means. In determining the GHG 2020 limit, CARB used the above as the “definition.” It is broad enough to allow for design features to be counted as reductions.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 8
AB 32 requires CARB to update the Scoping Plan at least once every five years. CARB adopted the first major update to the Scoping Plan on May 22, 2014. The updated Scoping Plan identifies the actions California has already taken to reduce GHG emissions and focuses on areas where further reductions could be achieved to help meet the 2020 target established by AB 32. The Scoping Plan update also looks beyond 2020 toward the 2050 goal, established in Executive Order S-3-05, and observes that “a mid-term statewide emission limit will ensure that the State stays on course to meet our long-term goal.” On January 20, 2017, CARB released the proposed Second Update to the Scoping Plan, which identifies the State’s post-2020 reduction strategy. The Second Update was finalized in November 2017 and approved on December 14, 2017, and reflects the 2030 target of a 40 percent reduction below 1990 levels, set by Executive Order B-30-15 and codified by SB 32. The 2017 Scoping Plan Update establishes a new Statewide emissions limit of 260 million MTCO2e for the year 2030, which corresponds to a 40 percent decrease in 1990 levels by 2030.
On December 15, 2022, CARB released the 2022 Scoping Plan for Achieving Carbon Neutrality (2022 Scoping Plan), which identifies the strategies achieving carbon neutrality by 2045 or earlier. The 2022 Scoping Plan contains the GHG reductions, technology, and clean energy mandated by statutes. The 2022 Scoping Plan was developed to achieve carbon neutrality by 2045 through a substantial reduction in fossil fuel dependence, while at the same time increasing deployment of efficient non-combustion technologies and distribution of clean energy. The plan would also reduce emissions of short-lived climate pollutants (SLCPs) and would include mechanical CO2 capture and sequestration actions, as well as emissions and sequestration from natural and working lands and nature-based strategies. Under 2022 Scoping Plan, by 2045, California aims to cut GHG emissions by 85 percent below 1990 levels, reduce smog-forming air pollution by 71 percent, reduce the demand for liquid petroleum by 94 percent compared to current usage, improve health and welfare, and create millions of new jobs. This plan also builds upon current and previous environmental justice efforts to integrate environmental justice directly into the plan, to ensure that all communities can reap the benefits of this transformational plan.
California Building Energy Efficiency Standards (Title 24) The 2022 California Building Energy Efficiency Standards for Residential and Nonresidential Buildings (California Code of Regulations, Title 24, Part 6), commonly referred to as “Title 24,” became effective on January 1, 2023. In general, Title 24 requires the design of building shells and building components to conserve energy. The standards are updated periodically to allow consideration and possible incorporation of new energy efficiency technologies and methods. The 2022 Title 24 standards encourage efficient electric heat pumps, establish electric-ready requirements for new homes, expand solar photovoltaic and battery storage standards, strengthen ventilation standards, and more.
California Green Building Standards (CALGreen)
The 2022 California Green Building Standards Code (California Code of Regulations, Title 24, Part 11), commonly referred to as CALGreen, went into effect on January 1, 2023. CALGreen is the first-in-thenation mandatory green buildings standards code. The California Building Standards Commission developed CALGreen to meet the State’s landmark initiative Assembly Bill (AB) 32 goals, which established a comprehensive program of cost-effective reductions of GHG emissions to 1990 levels by 2020. CALGreen was developed to (1) reduce GHG emissions from buildings; (2) promote environmentally responsible, cost-effective, and healthier places to live and work; (3) reduce energy and water consumption; and (4) respond to the environmental directives of the administration. CALGreen requires that new buildings employ water efficiency and conservation, increase building system efficiencies (e.g., lighting, Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 9
heating/ventilation and air conditioning [HVAC], and plumbing fixtures), divert construction waste from landfills, and incorporate electric vehicles charging infrastructure. There is growing recognition among developers and retailers that sustainable construction is not prohibitively expensive, and that there is a significant cost-savings potential in green building practices and materials.8 Regional
2020-2045 Regional Transportation Plan/ Sustainable Communities Strategy On September 3, 2020, the Regional Council of the Southern California Association of Governments (SCAG) formally adopted the Connect SoCal: 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy (2020-2045 RTP/SCS). The SCS portion of the 2020-2045 RTP/SCS highlights strategies for the region to reach the regional target of reducing GHGs from autos and light-duty trucks by 8 percent per capita by 2020, and 19 percent by 2035 (compared to 2005 levels). Specially, these strategies are to:
• Focus growth near destinations and mobility options;
• Promote diverse housing choices;
• Leverage technology innovations;
• Support implementation of sustainability policies; and • Promote a green region.
Furthermore, the 2020-2045 RTP/SCS discusses a variety of land use tools to help achieve the Statemandated reductions in GHG emissions through reduced per capita vehicle miles traveled (VMT). Some of these tools include center focused placemaking, focusing on priority growth areas, job centers, transit priority areas, as well as high quality transit areas and green regions.
The most recent 2024-2050 RTP/SCS was adopted by SCAG’s Regional Council in April 2024. The 2024- 2050 RTP/SCS outlines a vision for a more resilient and equitable future, with investment, policies, and strategies for achieving the region’s shared goals through 2050. The 2024-2050 RTP/SCS sets forth a forecasted regional development pattern which, when integrated with the transportation network, measures, and policies, will reduce GHG emissions from automobiles and light-duty trucks and achieve the GHG emissions reduction target for the region set by the CARB. In addition, the 2024-2050 RTP/SCS is supported by a combination of transportation and land use strategies that outline how the region can achieve California’s GHG-emission-reduction goals and federal Clean Air Act requirements. These are articulated in a set of Regional Strategic Investments, Regional Planning Policies, and Implementation Strategies. The Regional Planning Policies are a resource for County Transportation Commissions (CTCs) and local jurisdictions, who can refer to specific policies to demonstrate alignment with the 2024-2050 RTP/SCS when seeking resources from state or federal programs. The Implementation Strategies articulate priorities for SCAG efforts in fulfilling or going beyond the Regional Planning Policies.9 While SCAG has adopted the 2024-2050 RTP/SCS, CARB has not yet certified it or approved SCAG’s GHG emissions reduction calculations.
8 U.S. Green Building Council, Green Building Costs and Savings, https://www.usgbc.org/articles/green-building-costsand-savings, accessed July 31, 2024. 9 Southern California Association of Governments, Connect SoCal: A Plan for Navigating to a Brighter Future (2024-2050 Regional Transportation Plan/Sustainable Communities Strategy), adopted April 4, 2024.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 10
Local
City of Beverly Hills
City of Beverly Hills General Plan
The City of Beverly Hills General Plan (General Plan), adopted in January 2010, contains the following goals related to GHG emission reduction.
Land Use Element
Goal LU 14 - Environmental Sustainability and Carbon Footprint: Lan uses and built form that are environmentally sustainable by minimizing consumption of scarce resources, pollution, greenhouse gas emissions, wastes, and exposure of residents and visitors to toxics and hazards.
Open Space Element
Goal OS 7 - Improved Air Quality: Improved health and sustainability of the community through improved regional air quality and reduced greenhouse gas emissions that contribute to climate change.
Objective OS 7.9: Work with the California Air Resources Board (CARB) and the SCAQMD to comply with statewide greenhouse gas reduction goals as established in AB 32 and other subsequent legislation.
Beverly Hills Sustainable City Plan
The following elements the Beverly Hills Sustainable City Plan (SCP)10 includes goals and policies related to GHG: Climate Change and Air Quality Element, Energy Element, and Land-Use, Transportation and Open Space Element. The following goals, objectives, and policies are applicable to the proposed project:
Climate Change and Air Quality Element
Goal 2: Combat climate change and improve air quality.
Objective 2: Reduce and encourage the reduction of air emissions in City operations and Citywide.
Policy 2.2: Minimize mobile source emissions from on and off-road (construction) vehicles.
Energy Element
Goal 3: Encourage the use of energy in a clean and efficient manner and the use of renewable energy sources.
10 City of Beverly Hills, Beverly Hills Sustainable City Plan¸ February 17, 2009, http://www.beverlyhills.org/cbhfiles/storage/files/24347783778629768/SustainableCityPlan.pdf, accessed July 31, 2024.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 11
Objective 3: Reduce the use of non-renewable fuels through efficiency and an increase in use of renewable energy.
Policy 3.2: Maximize the use of renewable energy generating systems and other energy efficient technologies on City, other agency, residential, and commercial buildings.
Policy 3.3: Minimize the use of nonrenewable, polluting transportation fuels.
Land-Use, Transportation and Open Space Element
Goal 5: Foster an energy efficient, walk-able community that provides ample goods, services and benefits to all residents while respecting the local environment.
Objective 5: Encourage buildings, infrastructure, parks and open space that better the quality of life for all who live, work and play in the City.
Policy 5.1: Implement land-use and transportation programs that encourage new buildings, re-use of buildings, infrastructure, parks and open space that improve the quality of life for all who live, work and play in the City.
Policy 5.2: Promote a diversity of buildings, infrastructure, parks, open space and uses to support a variety of businesses and improve the quality-of-life for residents at all income levels.
Policy 5.3: Reduce traffic congestion while improving the pedestrian experience on roadways and encourage alternative forms of travel, especially to parks.
City of Los Angeles
City of Los Angeles General Plan
The Air Quality Element of the City of Los Angeles General Plan11 includes goals and polices related to GHG emissions. The following goals, objectives, and policies are applicable to the proposed project:
Air Quality Element
Goal 2: Less reliance on single-occupant vehicles with fewer commute and non-work trips.
Objective 2.2: It is the objective of the City of Los Angeles to increase vehicle occupancy for non-work trips by creating disincentives for single passenger vehicles, and incentives for high occupancy vehicles.
Policy 2.2.1: Discourage single-occupant vehicle use through a variety of measures such as market incentive strategies, mode-shift incentives, trip reduction plans and ridesharing subsidies.
11 City of Los Angeles, Air Quality Element¸ Adopted November 24, 1992, https://planning.lacity.gov/odocument/0ff9a9b0- 0adf-49b4-8e07-0c16feea70bc/Air_Quality_Element.pdf, accessed July 8, 2024.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 12
Policy 2.2.2: Encourage multi-occupant vehicle travel and discourage single-occupant vehicle travel by instituting parking management practices.
Goal 4: Minimal impact of existing land use patterns and future land use development on air quality by addressing the relationship between land use, transportation, and air quality.
Objective 4.2: It is the objective of the City of Los Angeles to reduce vehicle trips and vehicle miles traveled associated with land use patterns.
Policy 4.2.3: Ensure that new development is compatible with pedestrians, bicycles, transit, and alternative fuel vehicles.
Policy 4.2.5: Emphasize trip reduction, alternative transit and congestion management measures for discretionary projects.
Goal 5: Energy efficiency through land use and transportation planning, the use of renewable resources and less polluting fuels, and the implementation of conservation measures including passive methods such as site orientation and tree planting.
Objective 5.1: It is the objective of the City of Los Angeles to increase energy efficiency of City facilities and private developments.
Policy 5.1.2: Effect a reduction in energy consumption and shift to non-polluting sources of energy in its buildings and operations.
Policy 5.1.4: Reduce energy consumption and associated air emissions by encouraging waste reduction and recycling.
L.A.’s Green New Deal
The City of Los Angeles’s Sustainability pLAn was first published in 2015, formalizing a commitment to addressing the climate emergency. The plan included a series of targets and strategies across different city sectors and departments to reduce GHG emissions. The second iteration of the plan was released in 2019, called L.A.’s Green New Deal. The plan is consistent with the objectives of the Paris Climate Agreement, which commits signatories to a climate action plan to help limit global warming to 1.5 degrees Celsius above pre-industrial levels. This plan is also recognized by the CARB as a comprehensive GHG reduction plan; it points to a Community and Municipal GHG Inventory as prepared by the Department of Public Works Bureau of Sanitation (LASAN), sets GHG reduction targets, forecasts emissions and determines emissions reductions required to meet targets, and lays out a selection of strategies to meet emission reduction targets. The Green New Deal includes the following targets:
• Supply 55% renewable energy by 2025; 80% by 2036; and 100% by 2045 • Source 70% of our water locally by 2035, and capture 150,000 acre feet per year of stormwater by 2035
• Reduce building energy use per square feet for all types of buildings 22% by 2025; 34% by 2035; and 44% by 2050
• Reduce Vehicle Miles Traveled per capita by at least 13% by 2025, 39% by 2035, and 45% by 2050 Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 13
• Ensure 57% of new housing units are built within 1,500 feet of transit by 2025; and 75% by 2035 • Increase the percentage of zero emission vehicles in the city to 25% by 2025; 80% by 2035; and 100% by 2050
• Create 300,000 green jobs by 2035; and 400,000 by 2050 • Convert all city fleet vehicles to zero emission where technically feasible by 2028 • Reduce municipal GHG emissions 55% by 2025 and 65% by 2035 from 2008 baseline levels, reaching carbon neutral by 2045
City of Los Angeles Green Building Code
The Los Angeles Green Building Code (LAGBC) is based on the CALGreen Code that was developed and mandated by the State to attain consistency among the various jurisdictions within the State, reduce the building's energy and water use, reduce waste, and reduce the carbon footprint. The LAGBC is Article 9 of Chapter IX of the Los Angeles Municipal Code, and adopts by reference the 2022 CALGreen Code. The provisions of LAGBC apply to the construction of every new building, every building alteration with a building permit valuation of $200,000 or more, and every building addition, unless otherwise indicated in the LAGBC, throughout the City of Los Angeles.
CALIFORNIA ENVIRONMENTAL QUALITY ACT THRESHOLDS
The environmental analysis in this memorandum is patterned after the Initial Study Checklist recommended by the CEQA Guidelines, as amended. The issues presented in the Initial Study Checklist have been utilized as thresholds of significance in this section. Accordingly, a project may create a significant environmental impact if it causes one or more of the following to occur:
• Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment (refer to Impact Statement GHG-1); and/or • Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases (refer to Impact Statement GHG-2).
Methodology
Amendments to CEQA Guidelines Section 15064.4 were adopted to assist lead agencies in determining the significance of the impacts of GHG emissions. Consistent with existing CEQA practice, Section 15064.4 gives lead agencies the discretion to determine whether to assess those emissions quantitatively or qualitatively. This section recommends certain factors to be considered in the determination of significance (i.e., the extent to which a project may increase or reduce GHG emissions compared to the existing environment; whether the project exceeds an applicable significance threshold; and the extent to which the project complies with regulations or requirements adopted to implement a plan for the reduction or mitigation of GHGs). The amendments do not establish a quantified or performance-based threshold of significance; rather, lead agencies are granted discretion to establish significance thresholds for their respective jurisdictions, including looking to thresholds developed by other public agencies or suggested by other experts, such as the California Air Pollution Control Officers Association (CAPCOA), so long as any threshold chosen is supported by substantial evidence (see CEQA Guidelines Section 15064.7(c)).
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 14
The City of Beverly Hills and City of Los Angeles have not adopted numerical significance thresholds for assessing impacts related to GHG emissions. Similarly, the SCAQMD, CARB, or any other State or regional agency have not yet adopted a numerical significance threshold for assessing GHG emissions that is applicable to the project. Since there is no applicable adopted or accepted numerical threshold of significance for GHG emissions, the methodology for evaluating the project’s impacts related to GHG emissions focuses on its consistency with statewide, regional, and local plans adopted for the purpose of reducing and/or mitigating GHG emissions. This evaluation of consistency with such plans is the sole basis for determining the significance of the project’s GHG-related impacts on the environment.
Notwithstanding, for informational purposes, the analysis also calculates the amount of GHG emissions that would be attributable to the project using recommended air quality models, as described below. The primary purpose of quantifying the project’s GHG emissions is to satisfy State CEQA Guidelines Section 15064.4(a), which calls for a good-faith effort to describe and calculate emissions. The estimated emissions inventory is also used to determine if there would be a reduction in the project’s incremental contribution of GHG emissions as a result of compliance with regulations and requirements adopted to implement plans for the reduction or mitigation of GHG emissions.
IMPACT ANALYSIS
GHG-1: Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
GHG-2: Would the project conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Level of Significance: Less Than Significant Impact.
Project-Related Sources of Greenhouse Gases
The proposed project would result in direct and indirect GHG emissions. Direct project-related GHG emissions would include emissions from construction activities, area sources, mobile sources, and refrigerants, while indirect sources would include emission from energy consumption, water demand, and solid waste generation. The most recent version of the California Emissions Estimator Model (CalEEMod), version 2022.1 was used to calculate project-related GHG emissions. Project construction would consist of demolition, grading, building construction, and architectural coating and would occur during a single phase over a period of 32 months, starting in October 2025 and concluding in May 2028. The project would require approximately 19,000 cubic yards of earthwork export. It should be noted that, as a conservative analysis, operational emissions associated with the existing uses are not deducted from project emissions. Table 1, Estimated Greenhouse Gas Emissions, presents the estimated GHG emissions of the proposed project. CalEEMod outputs are contained within Appendix A, Greenhouse Gas Emissions Data.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 15
Table 1
Estimated Greenhouse Gas Emissions
Source
CO2 CH4 N2O Refrigerants CO2e
Metric Tons/year1
Direct Emissions
Construction (amortized over 30 years) 28.60 <0.01 <0.01 0.01 28.96 Area Source 16.16 0.02 <0.01 0.00 16.58
Mobile Source 276.41 0.01 0.01 0.34 280.57
Refrigerants 0.00 0.00 0.00 0.06 0.06
Total Direct Emissions2 321.16 0.03 0.01 0.42 326.17
Indirect Emissions
Energy 115.54 0.01 <0.01 0.00 116.03
Water Demand 4.76 0.06 <0.01 0.00 6.80
Solid Waste 3.43 0.34 <0.01 0.00 12.01
Total Indirect Emissions2 123.73 0.42 <0.01 <0.01 134.84 Total Project-Related Emissions2 461.01 MTCO2e/year
Notes:
1. Emissions calculated using California Emissions Estimator Model Version 2022.1 (CalEEMod) computer model.
2. Totals may be slightly off due to rounding.
Refer to Appendix A for assumptions used in this analysis.
Direct Project-Related Source of Greenhouse Gases
Construction Emissions. Construction GHG emissions are amortized (i.e., total construction emissions divided by the lifetime of the project, assumed to be 30 years), 12 then added to the operational emissions.
As seen in Table 1, construction of the proposed project would result in a total of 28.96 MTCO2e per year when amortized over 30 years. This would represent a total of approximately 869 MTCO2e from all construction activities.
Area Source. Area source emissions were calculated using CalEEMod and project-specific land use data.
Project-related area sources include exhaust emissions from landscape maintenance equipment, such as lawnmowers, shedders/grinders, blowers, trimmers, chain saws, and hedge trimmers used to maintain the landscaping of the site. As noted in Table 1, the proposed project would result in 16.58 MTCO2e per year of area source GHG emissions.
Mobile Source Emissions. Based on CalEEMod defaults, the project would generate approximately 283 daily trips during weekdays, 255 trips on Saturdays, and 213 trips on Sundays, which equates to approximately 280.57 MTCO2e per year of mobile source-generated GHG emissions as modeled in CalEEMod; refer to Table 1.
Refrigerants. Refrigerants are substances used in equipment for air conditioning and refrigeration. Most of the refrigerants used today are HFCs or blends thereof, which can have high GWP values. All equipment that uses refrigerants has a charge size (i.e., quantity of refrigerant the equipment contains), and an operational refrigerant leak rate, and each refrigerant has a GWP that is specific to that refrigerant.
CalEEMod quantifies refrigerant emissions from leaks during regular operation and routine servicing over 12 In accordance with the SCAQMD guidance, projected GHGs from construction have been quantified and amortized over 30 years, which is the number of years considered to represent the life of the project. The amortized construction emissions are added to the annual average operational emissions.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 16
the equipment lifetime, and then derives average annual emissions from the lifetime estimate. Project’s operation primarily includes air conditioning and refrigeration on-site. The project would directly result in
0.06 MTCO2e per year from refrigerants; refer to Table 1.
Indirect Project-Related Source of Greenhouse Gases
Energy Consumption. Energy consumption emissions were calculated using the CalEEMod model and project-specific land use data. Electricity and natural gas would be provided to the project site via the Los Angeles Department of Water and Power and Southern California Gas Company. The project would install high efficiency lighting, appliances, and solar ready roofs. However, as a conservative analysis, these project design features were not accounted for in the modeling. The project would indirectly result in 116.03 MTCO2e per year of GHG emissions due to energy consumption; refer to Table 1.
Water Demand. The proposed project’s operations would result in a demand of approximately 1.95 million gallons of water per year, refer to Appendix A. Emissions from indirect energy impacts due to water supply would result in 6.80 MTCO2e per year; refer to Table 1.
Solid Waste. Solid waste associated with operations of the proposed project would result in 12.01 MTCO2e per ear; refer to Table 1.
Total Project-Related Sources of Greenhouse Gases
As shown in Table 1, the total amount of proposed project-related GHG emissions from direct and indirect sources combined would total 461.01 MTCO2e per year.
Consistency with Applicable GHG Plans, Policies, or Regulations The GHG plan consistency analysis for the project is based on the project’s consistency with the SCAG’s 2020-2045 RTP/SCS, CARB’s 2022 Scoping Plan, City of Beverly Hills General Plan, Beverly Hills Sustainable City Plan, and City of Los Angeles General Plan. The 2020-2045 RTP/SCS is a regional growth management strategy that targets per-capita GHG reduction from passenger vehicles and light-duty trucks in the Southern California region. The 2020-2045 RTP/SCS incorporates local land use projections and circulation networks in city and county general plans. The 2022 Scoping Plan describes the approach California will take to reduce GHG emissions by 40 percent below 1990 levels by the year 2030. The City of Beverly Hills General Plan and City of Los Angeles General Plan contain goals and policies to reduce GHG emissions in both cities. Similarly, the Beverly Hills Sustainable City Plan (SCP) contains goals intended to support sustainable development within the City of Beverly Hills, and implementation of the SCP would contribute to a reduction in the City of Beverly Hills overall GHG emissions.
Consistency with the SCAG 2020-2045 RTP/SCS
As mentioned above, the latest 2024-2050 RTP/SCS (Connect SoCal 2024) was adopted on April 4, 2024.
However, CARB concluded that the technical methodology SCAG used to quantify the GHG emission reductions for the Connect SoCal 2024 does not operate accurately.13 SCAG resubmitted the Sustainable Communities Strategy (SCS) Submittal Package for CARB’s review in June 2024. CARB will have 60 business days to evaluate it and make its determination. Review by CARB is limited to acceptance or rejection of 13 California Air Resources Board, RE: CARB Review of Southern California Association of Governments’ 2024 SCS Senate Bill 375 Greenhouse Gas Emissions Draft Technical Methodology, March 29, 2024, https://ww2.arb.ca.gov/sites/default/files/2024-04/SCAG%20memo%20final.pdf, accessed July 31, 2024.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 17
SCAG’s determination that its SCS would, if implemented, achieve the region’s GHG emission reduction target. If CARB rejects SCAG’s determination of meeting the GHG emission target, SCAG would need to revise the SCS or adopt an alternative planning strategy demonstrating the ability to achieve the target.
As such, until CARB makes the decision, Connect SoCal 2024 is not a fully adopted document and is potentially subject to further updates, especially from the GHG reduction perspective of the methods and assumptions of the calculation of Auto Operating Costs (AOC)14, induced travel, electric vehicle incentives, job center parking and parking deregulation, off-model strategy assumptions, and emissions factors. As CARB has not made the decision at the time of preparation of this document, the consistency analysis relies upon the 2020-2045 RTP/SCS. Table 2¸ Consistency with the 2020-2045 RTP/SCS shows the project’s consistency with these five strategies found within the 2020-2045 RTP/SCS. As shown therein, the proposed project would be consistent with the GHG emission reduction strategies contained in the 2020- 2045 RTP/SCS.
Table 2
Consistency with the 2020-2045 RTP/SCS
Reduction Strategy
Applicable
Land Use
Tools
Project Consistency Analysis
Focus Growth Near Destinations and Mobility Options
• Emphasize land use patterns that
facilitate multimodal access to work,
educational and other destinations.
Center
Focused
Placemaking,
Priority
Growth Areas
(PGA), Job
Centers, High
Quality
Transit Areas
(HQTAs),
Transit
Priority Areas
(TPA),
Neighborhood
Mobility Areas
(NMAs),
Livable
Corridors,
Spheres of
Influence
(SOIs), Green
Region, Urban
Greening.
Consistent. The proposed Project would construct a multi-family residential development near existing residential and commercial developments.
Transit Priority Areas (TPAs) are defined in the 0.5-mile radius around an existing or planned major transit stop or an existing stop along a High-Quality Transit Corridor (HQTC). A HQTC is defined as a corridor with fixed route bus service frequency of 15 minutes (or less) during peak commute hours. The project is located within an HQTC and TPA.
1,2 Specifically, the closest bus
stop is the Burton/Doheny bus stop, approximately 1,500 feet to the south. As such, the project site is within an area that is adequately serviced by public transit. The project would also include short- and long-term bicycle parking which would encourage residents and visitors to utilize biking as an alternative mode of transportation.
Further, the project site would be a pedestrian friendly development as it is located within walking distances to existing grocery stores (Ralphs and Bristol Farm) which are less than 0.1 miles to the northeast, and existing commercial retails (Beverly Center Shopping Mall) less than 0.7 miles to the east. As such, the project would be consistent with this strategy.
• Focus on a regional jobs/housing
balance to reduce commute times and
distances and expand job
opportunities near transit and along
Consistent. The proposed project is a residential development that would replace the existing 15-unit multi-family residential building with a new residential building comprising of 52 dwelling units (12 units in the City of Beverly Hills and 40 units in the City 14 AOC is used as key variable across several major model components of the travel demand model, such as vehicle ownership, destination choice, and mode choice. This parameter represents the expenses associated with the usage of vehicles, expressed in cents per mile or dollar per mile. AOC plays a pivotal role as a fundamental parameter within the travel demand model.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 18
Reduction Strategy
Applicable
Land Use
Tools
Project Consistency Analysis
center-focused main streets. of Los Angeles). As such, the proposed project would increase the overall regional housing availability. The project is not a retail or commercial development and as such, would not directly generate new job opportunities. Nevertheless, residents of the proposed project would be located near Beverly Boulevard, a major street in the City of Beverly Hills. As such, the project would be in close proximity to job opportunities that may be available from developments near this major street, and is consistent with this strategy.
• Plan for growth near transit
investments and support
implementation of first/last mile
strategies.
Consistent. As discussed, the proposed project is located within a TPA and HQTC. Specifically, the closest bus stop is the Burton/Doheny bus stop, approximately 1,500 feet to the south.
Additionally, the proposed project would include bicycle parking along Oakhurst Drive. This would encourage cycling as another mode of transportation. Additionally, the project is located within walking distances to existing destinations. The close proximity to existing destinations and the project’s features (reduced parking, proximity to public transit, and bicycle parking) would encourage residents and guests to use public transportation. As such, the project is consistent with this strategy.
• Promote the redevelopment of
underperforming retail developments
and other outmoded nonresidential
uses.
Not Applicable. The proposed project is not a retail or nonresidential development and as such, this strategy would not be applicable.
• Prioritize infill and redevelopment of
underutilized land to accommodate
new growth, increase amenities and
connectivity in existing
neighborhoods.
Consistent. The proposed project would replace the existing multi-family residential building comprising of 15 dwelling units with a new residential building comprising of 52 dwelling units (12 units in the City of Beverly Hills and 40 units in the City of Los Angeles). As such, the proposed project would redevelop the land to accommodate new population growth within both cities. As such, the project is consistent with this strategy.
• Encourage design and transportation
options that reduce the reliance on
and number of solo car trips (this
could include mixed uses or locating
and orienting close to existing
destinations).
Consistent. As discussed in the “right size” parking requirements consistency analysis below, the project would be subjected to California Government Code Section 65589.5(p)(1) which would require fewer parking spaces compared to the parking
requirements in the City of Beverly Hills and City of Los Angeles.
The reduction in parking spaces would reduce the overall number of solo car trips and promote the use of alternative modes of transportation. Specifically, the proposed project would include short- and long-term bicycle parking spaces which would encourage residents and visitors to utilize biking as an alternative mode of transportation. Additionally, the project is also located less than one mile from multiple bus stops serviced by the Los Angeles Metro. The project site is also located within walking distances to existing destinations such as grocery stores (Ralphs and Bristol Farms) located less than 0.1 miles to the northeast and the Beverly Center Shopping Mall less than 0.7 miles to the east. As such, the proposed project would include features that would reduce solo car trips and would be located near existing destinations (food, retail, and commercial destinations, and is consistent with this strategy.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 19
Reduction Strategy
Applicable
Land Use
Tools
Project Consistency Analysis
• Identify ways to “right size” parking
requirements and promote alternative
parking strategies (e.g. shared
parking or smart parking).
Consistent. Pursuant to California Government Code Section 65589.5(p)(1), the maximum parking ratio that may be required of a qualifying density bonus project is one on-site parking space for each zero to one bedroom unit, one and one-half on-site parking spaces for each two- to three-bedroom unit, and two and one-half parking spaces for each four- or more bedroom unit. Within the City of Beverly Hills, the building would include: two one-bedroom units; nine two-bedroom units; and one three-bedroom unit. As such, 17 parking spaces would be required for the proposed project. The proposed project would accommodate two basement parking levels, including 18 standard parking spaces in the City of Beverly Hills.
Similarly, the portion of the project within the City of Los Angeles is subjected to California Government Code Section
65589.5(p)(1). Within the City of Los Angeles, the building would include: four studio units; seven one-bedroom units; and 29 twobedroom units. As such, 55 parking spaces would be required for the proposed project. The proposed project would accommodate two levels of basement parking levels and parking at grade comprising of 57 parking spaces. As such, the project would be consistent with parking requirements in the City of Beverly Hills and City of Los Angeles.
Promote Diverse Housing Choices
• Preserve and rehabilitate affordable
housing and prevent displacement.
PGA, Job
Centers,
HQTAs, NMA,
TPAs, Livable
Corridors,
Green Region,
Urban
Greening.
Not Applicable. The proposed project would not displace existing affordable housing. As such, this strategy is not applicable.
However, it should be noted that the proposed project would increase the regional housing supply and affordable housing availability. Under Senate Bill 330, cities are not permitted to replace existing residential dwelling units unless a proposed project would replace each demolish unit with a one-to-one ratio.
Additionally, replacement units must be included in the proposed housing development. The proposed project would replace the existing 15-unit multi-family building with a new residential building comprising of 52 dwelling units (12 units in the City of Beverly Hills and 40 units in the City of Los Angeles). As such, the project is consistent with Senate Bill 330. Additionally, of the 52 proposed dwelling units, the proposed project would feature three affordable housing units (two very low income units and one low income unit) within the City of Beverly Hills and five very low income units and two low income units in the City of Los Angeles. • Identify funding opportunities for new
workforce and affordable housing
development.
Not Applicable. This strategy only pertains to governmental agencies and would not be applicable to development projects.
As such, this strategy would not be applicable.
• Create incentives and reduce
regulatory barriers for building context
sensitive accessory dwelling units to
increase housing supply.
Not Applicable. The proposed project does not include accessory dwelling units. As such, this strategy is not applicable.
Leverage Technology Innovations
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 20
Reduction Strategy
Applicable
Land Use
Tools
Project Consistency Analysis
• Promote low emission technologies
such as neighborhood electric
vehicles, shared rides hailing, car
sharing, bike sharing and scooters by
providing supportive and safe
infrastructure such as dedicated
lanes, charging and parking/drop-off
space.
HQTA, TPAs,
NMA, Livable
Corridors.
Consistent. The proposed project would include low emission features such as the installation of EV chargers, bicycle parking, and reduced parking. Incorporation of the features and
technology would reduce overall GHG emissions from
transportation related emissions. As such, the proposed project would be consistent with this strategy.
• Improve access to services through
technology—such as telework and
telemedicine as well as other
incentives such as a “mobility wallet,”
an app-based system for storing
transit and other multi-modal
payments.
Not Applicable. This strategy focuses on SCAG’s support on technology which may reduce VMT or allow for easier access to transportation options.
• Identify ways to incorporate “micropower grids” in communities, for example solar energy, hydrogen fuel
cell power storage and power
generation
Not Applicable. This strategy focuses on SCAG’s support on promoting “micro-power grids”.
Support Implementation of Sustainability Policies
• Pursue funding opportunities to
support local sustainable
development implementation projects
that reduce greenhouse gas
emissions
Center
Focused
Placemaking,
PGA, Job
Centers,
HQTAs, TPA,
NMAs, Livable
Corridors,
SOIs, Green
Region, Urban
Greening.
Consistent. While this strategy is focused on local governments, agencies, and organizations’ actions to support the
implementation of sustainability policies, the project would participate in opportunities provided by these agencies that would support sustainability. For example, the proposed project may participate in programs and rebates provided by Los Angeles Department of Water and Power that promotes sustainability. As such, the project is consistent with this strategy.
• Support statewide legislation that
reduces barriers to new construction
and that incentivizes development
near transit corridors and stations
Not Applicable. This strategy focuses on SCAG’s support on statewide legislation.
• Support local jurisdictions in the
establishment of Enhanced
Infrastructure Financing Districts
(EIFDs), Community Revitalization
and Investment Authorities (CRIAs),
or other tax increment or value
capture tools to finance sustainable
infrastructure and development
projects, including parks and open
space
Not Applicable. This strategy focuses on SCAG’s support on statewide legislation.
• Work with local jurisdictions/
communities to identify opportunities
and assess barriers to implement
sustainability strategies
Consistent. The project would work alongside the City of Beverly Hills, City of Los Angeles, and the Los Angeles Department of Water and Power in implementing required sustainability programs and/or optional rebate programs. As such, the project is consistent with this strategy.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 21
Reduction Strategy
Applicable
Land Use
Tools
Project Consistency Analysis
• Enhance partnerships with other
planning organizations to promote
resources and best practices in the
SCAG region
Not Applicable. This strategy focuses on SCAG’s support with local planning organizations.
• Continue to support long range
planning efforts by local jurisdictions
Not Applicable. This strategy focuses on SCAG’s support with local planning organizations.
Promote a Green Region
• Support development of local climate
adaptation and hazard mitigation
plans, as well as project
implementation that improves
community resiliency to climate
change and natural hazards
Green Region,
Urban
Greening,
Greenbelts
and
Community
Separators.
Not Applicable. This strategy focuses on SCAG’s support with local planning organizations.
• Support local policies for renewable
energy production, reduction of urban
heat islands and carbon sequestration
Consistent. As discussed above, the proposed project would have a solar ready roof for the future installation of photovoltaic panels for on-site renewable energy production. Additionally, the proposed project would include landscaping along the perimeter of the project site which would reduce the urban heat island effect.
Specifically, the project would also incorporate 1,762 square feet of landscaping, including trees and shrubs. As such, the project is consistent with this strategy.
• Integrate local food production into the
regional landscape
Not Applicable. This strategy focuses on incorporation of food production (community gardens).
• Promote more resource efficient
development focused on
conservation, recycling and
reclamation
Consistent. As discussed, the proposed project would incorporate a variety of project design features focused on sustainability and conservation such as low flow water fixtures, high efficiency lighting, and energy efficient appliances. The project would also comply with local and regional regulations for recycling and composting; refer to Table 3. As such, the project is consistent with this strategy.
• Preserve, enhance and restore
regional wildlife connectivity
Not Applicable. The project is located within an urbanized and built environment.
• Reduce consumption of resource
areas, including agricultural land
Not Applicable. The project is located within an urbanized and built environment. Project development would not remove any agricultural land.
• Identify ways to improve access to
public park space
Not Applicable. This strategy focuses on SCAG’s cooperation with local agencies in supporting accessibility public parks.
Note:
1. Southern California Association of Governments, High Quality Transit Areas (HQTA) 2045 – SCAG Region, https://gisdatascag.opendata.arcgis.com/datasets/43e6fef395d041c09deaeb369a513ca1/explore?location=34.066267%2C-118.377301%2C13.89, accessed August 2, 2024.
2. Southern California Association of Governments, 2045 Transit Priority Areas (TPAs) – SCAG Region, https://hub.scag.ca.gov/datasets/c6b4717526c247528d868c2fc046894d/explore?location=34.078422%2C-118.386281%2C16.00, accessed August 2, 2024.
Source: Southern California Association of Governments, 2020-2040 Regional Transportation Plan/Sustainable Communities Strategy – Connect SoCal, September 3, 2020.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 22
Consistency with the 2022 CARB Scoping Plan
The 2022 Scoping Plan identifies reduction measures necessary to achieve the goal of carbon neutrality by 2045 or earlier. Actions that reduce GHG emissions are identified for each AB 32 inventory sector.
Provided in Table 3, Consistency with the 2022 Scoping Plan, is an evaluation of applicable reduction actions/strategies by emissions source category to determine how the project would be consistent with or exceed reduction actions/strategies outlined in the 2022 Scoping Plan.
Table 3
Consistency with the 2022 Scoping Plan
Actions and Strategies Project Consistency Analysis
Smart Growth / Vehicles Miles Traveled (VMT)
Reduce VMT per capita to 25% below
2019 levels by 2030, and 30% below
2019 levels by 2045
Consistent. The project would include various design features that would promote the reduction of overall VMT generated from the proposed development. Such features include the installation of bicycle parking, reduced parking, close proximity to existing destinations, and proximity to public transportation. As discussed above, the proposed project is located within a TPA and HQTC. As such, the bus stops near the project site are adequately serviced and would be a reliable and consistent mode of transportation. Additionally, the project would be a qualifying density bonus project and pursuant of California Government Code Section 65589.5(p)(1), would have reduce parking requirements compared to the City of Los Angeles and City of Beverly Hills. The reduction in parking spots would encourage carpooling which would lower overall VMT. The project would also install short- and long-term bicycle parking spots which would encourage residents and guests to utilize cycling as an alternative mode of transportation. Lastly, the project is located within walking distances to existing destinations that residents may potentially visit, such as grocery stores (Ralphs and Bristol Farms) located less than 0.1 miles to the northeast and commercial and retail destinations (Beverly Center Shopping Mall) located less than 0.7 miles to the east. As such, the project’s close proximity to existing public transit and destinations and design features (reduced parking and bicycle facilities) would reduce overall VMT. As such, the project would be consistent with this action.
New Residential and Commercial Buildings
All electric appliances beginning 2026
(residential) and 2029 (commercial),
contributing to 6 million heat pumps
installed statewide by 2030
Not Applicable. The project is expected to consist of natural gas heating and/or cooking on-site. It should be noted that the project’s building permit would be applied before 2026 and as such, is before the date required by this action. Thus, this action would not be applicable to the proposed project.
Additionally, the City of Beverly Hills has not adopted an ordinance or program limiting the use of natural gas for on-site cooking and/or heating. Additionally, the City of Beverly Hills also does not have any policy that requires an all electric development. However, if such policies are adopted in the future, the project would comply with the applicable goals or policies limiting the use of natural gas equipment in the future and/or requiring all electric developments. Furthermore, the project would install high efficiency lighting which would reduce energy consumption. As such, the project would be consistent with this action.
Construction Equipment
Achieve 25% of energy demand
electrified by 2030 and 75% electrified by
2045
Not Applicable. It should be noted that project construction would be completed prior to 2030. As such, the project would not be required to have 25 percent of construction equipment energy demand electrified. Additionally, the City of Beverly Hills has not adopted an ordinance or program requiring electricitypowered construction equipment which would be consistent with the 2022 Scoping Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 23
Actions and Strategies Project Consistency Analysis
Plan. However, if such programs or ordinance is adopted in the future, the project would be required to comply with the applicable goals or policies requiring the use of electric construction equipment in the future.
Non-combustion Methane Emissions
Divert 75% of organic waste from landfills
by 2025
Consistent. SB 1383 establishes targets to achieve a 50 percent reduction in the level of the statewide disposal of organic waste to a 75 percent reduction by 2025.
The law establishes an additional target that not less than 20 percent of currently disposed edible food is recovered for human consumption by 2025. The project would comply with local and regional regulations and recycle or compost 75 percent of waste by 2025 pursuant to SB 1383. As such, the project would be consistent with this action.
Source: California Air Resources Board, 2022 Scoping Plan, November 16, 2022.
Consistency with City of Beverly Hills General Plan and Sustainable City Plan As discussed above, the City of Beverly Hills General Plan contains several goals related to GHG emission reduction. Similarly, the City of Beverly Hills SCP contains goals intended to support sustainable development within the City of Beverly Hills, and implementation of the SCP would contribute to a reduction in the City Beverly Hills’s overall GHG emissions. Table 4, Consistency with Applicable Goals and Policies of the City of Beverly Hills General Plan and Sustainable City Plan, compares the proposed project to applicable policies from the SCP and City of Beverly Hills General Plan.
Table 4
Consistency with Applicable Goals and Policies of
the City of Beverly Hills General Plan and Sustainable City Plan Goal/Policy Project Consistency
City of Beverly Hills General Plan
Land Use Element
Goal LU 14 - Environmental Sustainability and Carbon
Footprint: Land uses and built form that are
environmentally sustainable by minimizing consumption of scarce resources, pollution, greenhouse gas emissions,
wastes, and exposure of residents and visitors to toxics and hazards.
Consistent. The City of Beverly Hills adopted the CALGreen Code as BHMC Section 9-1-1101, Adoption of the California Green Building Standards Code, which requires new buildings to implement sustainability techniques related to site development, indoor/outdoor water use, material conservation, etc. As such, the proposed project would be designed and constructed in
accordance with the sustainability techniques as outlined in the CALGreen Code and BHMC, in addition to those outlined in the 2022 Title 24 Standards. The project would also install energy efficient lighting and appliances and have an area on the rooftop reserved for future solar panel use. Additionally, pursuant of SB 1383, the project would comply with local and regional regulations and recycle or compost 75 percent of waste by 2025. As such, the project would be consistent with the goal.
Open Space Element
Goal OS 7 (Improved Air Quality): Improved health and
sustainability of the community through improved regional air quality and reduced greenhouse gas emissions that
contribute to climate change.
Objective OS 7.9: Work with the California Air
Resources Board (CARB) and the SCAQMD to
comply with statewide greenhouse gas reduction
goals as established in AB 32 and other subsequent
legislation.
Consistent. Refer to Table 3 for a project consistency analysis with the 2022 Scoping Plan, as well as the discussion under Land Use Element Goal LU-14, above. Additionally, the project would incorporate features which encourages conservation and
sustainability such as low flow fixtures, high efficiency lighting, and energy efficient appliances. The utilization of these features would reduce GHG emissions (production of electricity off-site and less energy used to obtain water off-site). As such, the project would be consistent with the goal.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 24
Table 4
Consistency with Applicable Goals and Policies of
the City of Beverly Hills General Plan and Sustainable City Plan Goal/Policy Project Consistency
City of Beverly Hills Sustainable City Plan
Climate Change and Air Quality
Goal 2: Combat climate change and improve air quality.
Objective 2: Reduce and encourage the reduction of
air emissions in City operations and Citywide.
Policy 2.2: Minimize mobile source emissions
from on and off-road (construction) vehicles.
Consistent. Pursuant of the Beverly Hills Municipal Code Section 10-3-2816, two parking spaces be provided for each one-bedroom unit, two and one-half parking spaces for each two-bedroom unit, and three parking spaces for each three- or four-bedroom units.
However, as the project is a qualifying density bonus project, the maximum parking ratios that may be required is one on-site parking space for each zero to one bedroom unit, one and onehalf on-site parking spaces for each two- to three-bedroom unit, and two and one-half parking spaces for each four or more bedroom unit pursuant of California Government Code Section 65589.5(p)(1). The vehicular parking ratio pursuant of California Government Code Section 65589.5(p)(1) would result in reduced parking than what is required by the City of Beverly Hills. As such, the reduced parking would encourage the use of alternative modes of transportation and would reduce vehicular trips. The proposed project’s close proximity to existing transit stops and potential destinations (grocery stores, retail, and commercial destinations) and installation of bicycle parking would encourage residents and guests to utilize alternative modes of transportation (public transit, walking, cycling). As such, the project would be consistent with the goal.
Energy
Goal 3: Encourage the use of energy in a clean and efficient manner and the use of renewable energy sources.
Objective 3: Reduce the use of non-renewable fuels
through efficiency and an increase in use of renewable
energy.
Policy 3.2: Maximize the use of renewable energy
generating systems and other energy efficient
technologies on City, other agency, residential,
and commercial buildings.
Policy 3.3: Minimize the use of nonrenewable,
polluting transportation fuels.
Consistent. The proposed project would comply with the 2022 Title 24 Building Energy Efficiency Standards and construct environmentally-sensitive architecture and building systems. The project would include energy-efficient lighting and appliances. The project would also provide bicycle parking and electrical vehicle charging spaces that would promote alternative modes of transportation that do not rely on non-renewable polluting transportation fuels. The project would be consistent with the goal.
Land Use, Transportation, and Open Space
Goal 5: Foster an energy-efficient, walkable community that provides ample goods, services, and benefits to all
residents while respecting the local environment.
Objective 5: Encourage buildings, infrastructure,
parks and open space that better the quality of life for all who live, work and play in the City.
Policy 5.1: Implement land-use and transportation
programs that encourage new buildings, re-use of
buildings, infrastructure, parks and open space
that improve the quality of life for all who live, work and play in the City.
Policy 5.2: Promote a diversity of buildings,
infrastructure, parks, open space and uses to
support a variety of businesses and improve the
quality-of-life for residents at all income levels.
Consistent. The proposed infill residential development is in an urbanized area within close proximity to existing bus stops operated by Los Angeles Metro. As discussed above, the project is located within a TPA and HQTC. Thus, the project would be adequately served by public transit and would represent a reliable and consistent mode of transportation. Additionally, the project site is located within walking distance to existing destinations such as grocery stores, retail, and commercial uses. Additionally, the project would provide bicycle storage spaces which would encourage cycling as an alternative modes of travel. Lastly, the reduce parking requirement pursuant to California Government Code Section 65589.5(p)(1) compared to what is required by the City of Beverly Hills would encourage residents to utilize the modes of transportation listed above. Residents of the proposed project would be able to reach numerous destinations via various modes of transportation, including biking, walking, and taking Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 25
Table 4
Consistency with Applicable Goals and Policies of
the City of Beverly Hills General Plan and Sustainable City Plan Goal/Policy Project Consistency
Policy 5.3: Reduce traffic congestion while
improving the pedestrian experience on roadways
and encourage alternative forms of travel,
especially to parks.
public transit. The proposed project would also provide landscaped courtyard on the second floor. As such, the project would foster an energy-efficient, walkable community and would be consistent with the goal.
Sources:
City of Beverly Hills, Beverly Hills Sustainable City Plan, February 17, 2009.
City of Beverly Hills, City of Beverly Hills General Plan, April 30, 2010.
Consistency with City of Los Angeles General Plan
As discussed above, the City of Los Angeles General Plan contains several goals related to GHG emission reduction. L.A.’s Green New Deal contains a series of targets and strategies across different city sectors and departments to reduce GHG emissions. It should be noted that all strategies included in L.A.’s Green New Deal are at the City level and do not apply to individual development projects, and therefore the project’s consistency with L.A.’s Green New Deal is not analyzed. Table 5, Consistency with Applicable Goals and Policies of the City of Los Angeles General Plan, compares the proposed project to applicable policies from the City of Los Angeles General Plan. It should be noted that the City of Beverly Hill’s decision on approving the proposed project is based on its consistency with the City of Beverly Hill’s General Plan, Sustainable City Plan, and applicable ordinances. The project’s consistency to the City of Los Angeles General Plan is provided for informational purposes only.
Table 5
Consistency with Applicable Goals and Policies of the City of Los Angeles General Plan Goal/Policy Project Consistency
City of Los Angeles General Plan
Air Quality Element
Goal 2: Less reliance on single-occupant vehicles with fewer commute and non-work trips.
Objective 2.2: It is the objective of the City of Los Angeles to increase vehicle occupancy for non-work trips by creating disincentives for single passenger vehicles, and incentives for high occupancy vehicles.
Policy 2.2.1: Discourage single-occupant vehicle use
through a variety of measures such as market incentive
strategies, mode-shift incentives, trip reduction plans and ridesharing subsidies.
Policy 2.2.2: Encourage multi-occupant vehicle travel
and discourage single-occupant vehicle travel by
instituting parking management practices.
Consistent. Pursuant to the Los Angeles Municipal Code
Section 12.22.25(d), two options are provided regarding parking requirements for density bonus projects. Option 1 requires that one parking spaces be provided for each zero to one bedroom unit, two parking spaces for each two or three-bedroom units, and two and one-half parking spaces for each four- or more bedroom unit. However, pursuant to California Government Code Section 65589.5(p)(1) the
maximum parking ratio that may be required of a qualifying density bonus project is one on-site parking space for each zero to one bedroom unit, one and one-half on-site parking spaces for each two- to three-bedroom unit, and two and one-half parking spaces for each four- or more bedroom unit.
As such, the proposed project would have less parking than what is required in the Los Angeles Municipal Code. The reduction in parking would discourage single-occupant
vehicle travel. As previously discussed, the project is located within a TPA and HQTC which would encourage public
transit travel. As such, the project would be consistent with the goal.
Air Quality Element Consistent. The project would include electric vehicle (EV) Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 26
Table 5
Consistency with Applicable Goals and Policies of the City of Los Angeles General Plan Goal/Policy Project Consistency
Goal 4: Minimal impact of existing land use patterns and future land use development on air quality by addressing the
relationship between land use, transportation, and air quality.
Objective 4.2: It is the objective of the City of Los Angeles to reduce vehicle trips and vehicle miles traveled associated with land use patterns.
Policy 4.2.3: Ensure that new development is compatible with pedestrians, bicycles, transit, and alternative fuel vehicles.
Policy 4.2.5: Emphasize trip reduction, alternative transit and congestion management measures for discretionary
projects.
charging stations, EV capable spaces, and bicycle parking spaces. The project is also located less than one mile from multiple bus stops serviced by the Los Angeles Metro. As such, the project is in close proximity to public transit and includes features that would promote alternative modes of transportation that would reduce vehicle trips and VMT. As such, the project would be consistent with the goal.
Air Quality Element
Goal 5: Energy efficiency through land use and transportation planning, the use of renewable resources and less polluting fuels, and the implementation of conservation measures including passive methods such as site orientation and tree planting.
Objective 5.1: It is the objective of the City of Los Angeles to increase energy efficiency of City facilities and private developments.
Policy 5.1.2: Effect a reduction in energy consumption and shift to non-polluting sources of energy in its buildings and operations.
Policy 5.1.4: Reduce energy consumption and associated
air emissions by encouraging waste reduction and
recycling.
Consistent. The City of Los Angeles adopted the CalGreen Code as Los Angeles Green Building Code (LAGBC), which
requires new buildings to implement sustainability
techniques related to site development, indoor/outdoor water use, material conservation, etc. As such, the proposed
project would be designed and constructed in accordance with the sustainability techniques as outlined in the
CALGreen Code and LAGBC, in addition to those outlined in the 2022 Title 24 Standards. The project would also install energy efficient lighting and appliances, and have an area on the rooftop reserved for future solar panel use. The project would also comply with local and regional regulations and recycle or compost 75 percent of waste by 2025 pursuant to SB 1383. As such, the project would be consistent with the goal.
Source: City of Los Angeles, City of Los Angeles General Plan, November 24, 1992.
Conclusion
In summary, the plan consistency analysis provided above demonstrates that the proposed project complies with or exceeds the plans, policies, regulations and GHG reduction actions/strategies outlined in the SCAG’s 2020-2045 RTP/SCS, CARB’s 2022 Scoping Plan, City of Beverly Hills General Plan, Beverly Hills Sustainable City Plan, and City of Los Angeles General Plan. Therefore, the project would not conflict with any applicable plan, policy, or regulation of an agency adopted for the purpose of reducing emissions of GHGs, and project-specific impacts regarding GHG emissions would be less than significant.
Mitigation Measures: No mitigation is required.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 27
REFERENCES
Documents
1. California Air Resources Board, 2022 Scoping Plan, November 16, 2022.
2. California Air Resources Board, California Greenhouse Gas Emissions for 2000 to 2021, https://ww2.arb.ca.gov/ghg-inventory-data, accessed July 31, 2024.
3. City of Beverly Hills, City of Beverly Hills General Plan, April 30, 2010.
4. City of Beverly Hills, General Plan Land Use Designation – City of Beverly Hills, January 25, 2022, https://www.beverlyhills.org/cbhfiles/storage/files/8673173201260376675/Landuse_11x17_20 220125.pdf, accessed July 8, 2024.
5. City of Beverly Hills, Beverly Hills Sustainable City Plan, February 17, 2009.
6. City of Los Angeles, General Plan Land Use Map, Wilshire Community Map, https://planning.lacity.gov/odocument/2ec22248-3c1e-4354-b5d1- 096cdf9845ab/wilplanmap.pdf, accessed July 8, 2024.
7. City of Los Angeles, Air Quality Element¸ Adopted November 24, 1992, https://planning.lacity.gov/odocument/0ff9a9b0-0adf-49b4-8e07- 0c16feea70bc/Air_Quality_Element.pdf, accessed July 8, 2024.
8. Scripps Institution of Oceanography, Carbon Dioxide Concentration at Mauna Loa Observatory, https://scripps.ucsd.edu/programs/keelingcurve/, accessed July 31, 2024.
9. Southern California Association of Governments, 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy – Connect SoCal, September 3, 2020.
10. Southern California Association of Governments, High Quality Transit Areas (HQTA) 2045 – SCAG Region,
https://gisdatascag.opendata.arcgis.com/datasets/43e6fef395d041c09deaeb369a513ca1/explore?location=34. 066267%2C-118.377301%2C13.89, accessed August 2, 2024.
11. Southern California Association of Governments, 2045 Transit Priority Areas (TPAs) – SCAG Region,
https://hub.scag.ca.gov/datasets/c6b4717526c247528d868c2fc046894d/explore?location=34.0 78422%2C-118.386281%2C16.00, accessed August 2, 2024.
12. South Coast Air Quality Management District, Draft Guidance Document—Interim CEQA Greenhouse Gas (GHG) Significance Threshold, October 2008.
13. U.S. Green Building Council, Green Building Costs and Savings, https://www.usgbc.org/articles/green-building-costs-and-savings, accessed July 31, 2024.
Oakhurst Apartments Project
Greenhouse Gas Emissions Technical Memorandum 28
Websites / Programs
1. Google Earth, 2024.
2. South Coast Air Quality Management District, California Emissions Estimator Model (CalEEMod), version 2022.1.
Appendix A
Greenhouse Gas Emissions Data
412 N Oakhurst Drive Detailed Report, 8/1/2024
1 / 82
412 N Oakhurst Drive Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year, Unmitigated
2.3. Construction Emissions by Year, Mitigated
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
2.6. Operations Emissions by Sector, Mitigated
3. Construction Emissions Details
3.1. Demolition (2025) - Unmitigated
3.2. Demolition (2025) - Mitigated
3.3. Grading (2025) - Unmitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
2 / 82
3.4. Grading (2025) - Mitigated
3.5. Grading (2026) - Unmitigated
3.6. Grading (2026) - Mitigated
3.7. Building Construction (2026) - Unmitigated
3.8. Building Construction (2026) - Mitigated
3.9. Building Construction (2027) - Unmitigated
3.10. Building Construction (2027) - Mitigated
3.11. Building Construction (2028) - Unmitigated
3.12. Building Construction (2028) - Mitigated
3.13. Architectural Coating (2028) - Unmitigated
3.14. Architectural Coating (2028) - Mitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.1.2. Mitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.2. Electricity Emissions By Land Use - Mitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
3 / 82
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.2.4. Natural Gas Emissions By Land Use - Mitigated
4.3. Area Emissions by Source
4.3.1. Unmitigated
4.3.2. Mitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
4.4.2. Mitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
4.5.2. Mitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.6.2. Mitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
4.7.2. Mitigated
4.8. Stationary Emissions By Equipment Type
412 N Oakhurst Drive Detailed Report, 8/1/2024
4 / 82
4.8.1. Unmitigated
4.8.2. Mitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.9.2. Mitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.2.2. Mitigated
5.3. Construction Vehicles
412 N Oakhurst Drive Detailed Report, 8/1/2024
5 / 82
5.3.1. Unmitigated
5.3.2. Mitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.9. Operational Mobile Sources
5.9.1. Unmitigated
5.9.2. Mitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.1.2. Mitigated
5.10.2. Architectural Coatings
412 N Oakhurst Drive Detailed Report, 8/1/2024
6 / 82
5.10.3. Landscape Equipment
5.10.4. Landscape Equipment - Mitigated
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.11.2. Mitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.12.2. Mitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.13.2. Mitigated
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.14.2. Mitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
5.15.2. Mitigated
5.16. Stationary Sources
412 N Oakhurst Drive Detailed Report, 8/1/2024
7 / 82
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.1.2. Mitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
5.18.2.2. Mitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
412 N Oakhurst Drive Detailed Report, 8/1/2024
8 / 82
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
412 N Oakhurst Drive Detailed Report, 8/1/2024
9 / 82
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name 412 N Oakhurst Drive
Construction Start Date 10/1/2025
Operational Year 2028
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70
Precipitation (days) 19.6
Location 412 N Oakhurst Dr, Beverly Hills, CA 90210, USA County Los Angeles-South Coast
City —
Air District South Coast AQMD
Air Basin South Coast
TAZ 4342
EDFZ 16
Electric Utility Los Angeles Department of Water & Power Gas Utility Southern California Gas
App Version 2022.1.1.26
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Apartments Mid
Rise
52.0 Dwelling Unit 0.35 54,619 478 — 154 —
412 N Oakhurst Drive Detailed Report, 8/1/2024
10 / 82
Enclosed Parking
with Elevator
75.0 Space 0.00 30,000 0.00 — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector # Measure Title
Construction C-10-A Water Exposed Surfaces
Construction C-10-B Water Active Demolition Sites
Construction C-11 Limit Vehicle Speeds on Unpaved Roads
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 8.12 8.09 10.5 16.1 0.02 0.43 5.67 6.10 0.40 2.66 3.06 — 3,099 3,099 0.13 0.16 3.18 3,131 Mit. 8.12 8.09 10.5 16.1 0.02 0.43 1.73 2.16 0.40 0.76 1.16 — 3,099 3,099 0.13 0.16 3.18 3,131 %
Reduced
— — — — — — 69% 65% — 71% 62% — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.62 1.34 11.3 15.7 0.02 0.48 5.67 6.14 0.44 2.66 3.10 — 3,064 3,064 0.13 0.17 0.08 3,093 Mit. 1.62 1.34 11.3 15.7 0.02 0.48 1.73 2.21 0.44 0.76 1.20 — 3,064 3,064 0.13 0.17 0.08 3,093 %
Reduced
— — — — — — 69% 64% — 71% 61% — — — — — — —
Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
11 / 82
Unmit. 1.22 1.17 7.48 11.1 0.02 0.28 2.57 2.85 0.26 1.16 1.42 — 2,182 2,182 0.09 0.09 0.90 2,202 Mit. 1.22 1.17 7.48 11.1 0.02 0.28 0.94 1.22 0.26 0.37 0.63 — 2,182 2,182 0.09 0.09 0.90 2,202 %
Reduced
— — — — — — 64% 57% — 68% 56% — — — — — — —
Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.22 0.21 1.36 2.03 < 0.005 0.05 0.47 0.52 0.05 0.21 0.26 — 361 361 0.01 0.02 0.15 365 Mit. 0.22 0.21 1.36 2.03 < 0.005 0.05 0.17 0.22 0.05 0.07 0.11 — 361 361 0.01 0.02 0.15 365 %
Reduced
— — — — — — 64% 57% — 68% 56% — — — — — — —
2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2026 1.62 1.35 10.5 16.1 0.02 0.43 5.67 6.10 0.40 2.66 3.06 — 3,099 3,099 0.13 0.16 3.18 3,131 2027 1.55 1.29 10.1 15.9 0.02 0.30 0.74 1.04 0.28 0.18 0.46 — 3,079 3,079 0.13 0.08 2.91 3,111 2028 8.12 8.09 0.84 1.68 < 0.005 0.02 0.13 0.15 0.01 0.03 0.04 — 264 264 0.01 0.01 0.37 266 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2025 1.40 1.13 11.3 10.9 0.02 0.48 5.67 6.14 0.44 2.66 3.10 — 2,753 2,753 0.13 0.17 0.07 2,805 2026 1.62 1.34 10.5 15.7 0.02 0.43 5.67 6.10 0.40 2.66 3.06 — 3,064 3,064 0.13 0.16 0.08 3,093 2027 1.55 1.29 10.2 15.4 0.02 0.30 0.74 1.04 0.28 0.18 0.46 — 3,045 3,045 0.11 0.08 0.08 3,073 2028 1.49 1.24 9.77 15.2 0.02 0.27 0.74 1.01 0.25 0.18 0.42 — 3,026 3,026 0.10 0.08 0.07 3,054 Average
Daily
— — — — — — — — — — — — — — — — — —
2025 0.18 0.14 1.39 1.58 < 0.005 0.05 0.47 0.52 0.05 0.18 0.23 — 375 375 0.02 0.02 0.17 382 2026 1.03 0.84 7.48 9.11 0.02 0.28 2.57 2.85 0.26 1.16 1.42 — 2,055 2,055 0.09 0.09 0.84 2,086 412 N Oakhurst Drive Detailed Report, 8/1/2024
12 / 82
2027 1.10 0.92 7.26 11.1 0.02 0.22 0.52 0.74 0.20 0.13 0.32 — 2,182 2,182 0.08 0.06 0.90 2,202 2028 1.22 1.17 1.84 2.92 < 0.005 0.05 0.15 0.20 0.05 0.03 0.08 — 571 571 0.02 0.02 0.22 577 Annual — — — — — — — — — — — — — — — — — —
2025 0.03 0.03 0.25 0.29 < 0.005 0.01 0.09 0.10 0.01 0.03 0.04 — 62.0 62.0 < 0.005 < 0.005 0.03 63.2 2026 0.19 0.15 1.36 1.66 < 0.005 0.05 0.47 0.52 0.05 0.21 0.26 — 340 340 0.01 0.02 0.14 345 2027 0.20 0.17 1.32 2.03 < 0.005 0.04 0.10 0.14 0.04 0.02 0.06 — 361 361 0.01 0.01 0.15 365 2028 0.22 0.21 0.34 0.53 < 0.005 0.01 0.03 0.04 0.01 0.01 0.01 — 94.6 94.6 < 0.005 < 0.005 0.04 95.5
2.3. Construction Emissions by Year, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2026 1.62 1.35 10.5 16.1 0.02 0.43 1.73 2.16 0.40 0.76 1.16 — 3,099 3,099 0.13 0.16 3.18 3,131 2027 1.55 1.29 10.1 15.9 0.02 0.30 0.74 1.04 0.28 0.18 0.46 — 3,079 3,079 0.13 0.08 2.91 3,111 2028 8.12 8.09 0.84 1.68 < 0.005 0.02 0.13 0.15 0.01 0.03 0.04 — 264 264 0.01 0.01 0.37 266 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2025 1.40 1.13 11.3 10.9 0.02 0.48 1.73 2.21 0.44 0.76 1.20 — 2,753 2,753 0.13 0.17 0.07 2,805 2026 1.62 1.34 10.5 15.7 0.02 0.43 1.73 2.16 0.40 0.76 1.16 — 3,064 3,064 0.13 0.16 0.08 3,093 2027 1.55 1.29 10.2 15.4 0.02 0.30 0.74 1.04 0.28 0.18 0.46 — 3,045 3,045 0.11 0.08 0.08 3,073 2028 1.49 1.24 9.77 15.2 0.02 0.27 0.74 1.01 0.25 0.18 0.42 — 3,026 3,026 0.10 0.08 0.07 3,054 Average
Daily
— — — — — — — — — — — — — — — — — —
2025 0.18 0.14 1.39 1.58 < 0.005 0.05 0.20 0.25 0.05 0.06 0.11 — 375 375 0.02 0.02 0.17 382 2026 1.03 0.84 7.48 9.11 0.02 0.28 0.94 1.22 0.26 0.37 0.63 — 2,055 2,055 0.09 0.09 0.84 2,086 2027 1.10 0.92 7.26 11.1 0.02 0.22 0.52 0.74 0.20 0.13 0.32 — 2,182 2,182 0.08 0.06 0.90 2,202 2028 1.22 1.17 1.84 2.92 < 0.005 0.05 0.15 0.20 0.05 0.03 0.08 — 571 571 0.02 0.02 0.22 577 412 N Oakhurst Drive Detailed Report, 8/1/2024
13 / 82
Annual — — — — — — — — — — — — — — — — — —
2025 0.03 0.03 0.25 0.29 < 0.005 0.01 0.04 0.05 0.01 0.01 0.02 — 62.0 62.0 < 0.005 < 0.005 0.03 63.2 2026 0.19 0.15 1.36 1.66 < 0.005 0.05 0.17 0.22 0.05 0.07 0.11 — 340 340 0.01 0.02 0.14 345 2027 0.20 0.17 1.32 2.03 < 0.005 0.04 0.10 0.14 0.04 0.02 0.06 — 361 361 0.01 0.01 0.15 365 2028 0.22 0.21 0.34 0.53 < 0.005 0.01 0.03 0.04 0.01 0.01 0.01 — 94.6 94.6 < 0.005 < 0.005 0.04 95.5
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 5.65 4.04 1.75 24.5 0.07 1.91 1.69 3.60 1.84 0.43 2.27 331 3,533 3,864 4.05 0.09 5.40 3,996 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 5.13 3.56 1.77 19.7 0.06 1.90 1.69 3.59 1.83 0.43 2.26 331 3,444 3,776 4.05 0.09 0.52 3,904 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.70 2.49 0.85 10.3 0.02 0.15 1.59 1.74 0.15 0.40 0.55 45.5 2,469 2,514 2.69 0.09 2.45 2,610 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.49 0.45 0.16 1.88 < 0.005 0.03 0.29 0.32 0.03 0.07 0.10 7.53 409 416 0.45 0.01 0.41 432
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
14 / 82
Mobile 0.94 0.85 0.60 7.15 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,811 1,811 0.08 0.07 5.01 1,839 Area 4.70 3.18 1.02 17.3 0.05 1.89 — 1.89 1.82 — 1.82 307 999 1,306 1.45 < 0.005 — 1,342 Energy 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 698 698 0.05 0.01 — 701 Water — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Waste — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Refrig. — — — — — — — — — — — — — — — — 0.39 0.39
Total 5.65 4.04 1.75 24.5 0.07 1.91 1.69 3.60 1.84 0.43 2.27 331 3,533 3,864 4.05 0.09 5.40 3,996 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.93 0.84 0.66 6.60 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,736 1,736 0.09 0.07 0.13 1,760 Area 4.19 2.71 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Energy 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 698 698 0.05 0.01 — 701 Water — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Waste — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Refrig. — — — — — — — — — — — — — — — — 0.39 0.39
Total 5.13 3.56 1.77 19.7 0.06 1.90 1.69 3.59 1.83 0.43 2.26 331 3,444 3,776 4.05 0.09 0.52 3,904 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 0.88 0.79 0.63 6.43 0.02 0.01 1.59 1.60 0.01 0.40 0.41 — 1,670 1,670 0.08 0.07 2.06 1,695 Area 1.81 1.68 0.09 3.81 < 0.005 0.13 — 0.13 0.13 — 0.13 21.0 76.6 97.6 0.10 < 0.005 — 100 Energy 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 698 698 0.05 0.01 — 701 Water — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Waste — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Refrig. — — — — — — — — — — — — — — — — 0.39 0.39
Total 2.70 2.49 0.85 10.3 0.02 0.15 1.59 1.74 0.15 0.40 0.55 45.5 2,469 2,514 2.69 0.09 2.45 2,610 Annual — — — — — — — — — — — — — — — — — —
Mobile 0.16 0.14 0.11 1.17 < 0.005 < 0.005 0.29 0.29 < 0.005 0.07 0.08 — 276 276 0.01 0.01 0.34 281 Area 0.33 0.31 0.02 0.70 < 0.005 0.02 — 0.02 0.02 — 0.02 3.48 12.7 16.2 0.02 < 0.005 — 16.6 412 N Oakhurst Drive Detailed Report, 8/1/2024
15 / 82
Energy < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 116 116 0.01 < 0.005 — 116 Water — — — — — — — — — — — 0.61 4.15 4.76 0.06 < 0.005 — 6.80 Waste — — — — — — — — — — — 3.43 0.00 3.43 0.34 0.00 — 12.0 Refrig. — — — — — — — — — — — — — — — — 0.06 0.06
Total 0.49 0.45 0.16 1.88 < 0.005 0.03 0.29 0.32 0.03 0.07 0.10 7.53 409 416 0.45 0.01 0.41 432
2.6. Operations Emissions by Sector, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.94 0.85 0.60 7.15 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,811 1,811 0.08 0.07 5.01 1,839 Area 4.70 3.18 1.02 17.3 0.05 1.89 — 1.89 1.82 — 1.82 307 999 1,306 1.45 < 0.005 — 1,342 Energy 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 698 698 0.05 0.01 — 701 Water — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Waste — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Refrig. — — — — — — — — — — — — — — — — 0.39 0.39
Total 5.65 4.04 1.75 24.5 0.07 1.91 1.69 3.60 1.84 0.43 2.27 331 3,533 3,864 4.05 0.09 5.40 3,996 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.93 0.84 0.66 6.60 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,736 1,736 0.09 0.07 0.13 1,760 Area 4.19 2.71 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Energy 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 698 698 0.05 0.01 — 701 Water — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Waste — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Refrig. — — — — — — — — — — — — — — — — 0.39 0.39
Total 5.13 3.56 1.77 19.7 0.06 1.90 1.69 3.59 1.83 0.43 2.26 331 3,444 3,776 4.05 0.09 0.52 3,904 412 N Oakhurst Drive Detailed Report, 8/1/2024
16 / 82
Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 0.88 0.79 0.63 6.43 0.02 0.01 1.59 1.60 0.01 0.40 0.41 — 1,670 1,670 0.08 0.07 2.06 1,695 Area 1.81 1.68 0.09 3.81 < 0.005 0.13 — 0.13 0.13 — 0.13 21.0 76.6 97.6 0.10 < 0.005 — 100 Energy 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 698 698 0.05 0.01 — 701 Water — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Waste — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Refrig. — — — — — — — — — — — — — — — — 0.39 0.39
Total 2.70 2.49 0.85 10.3 0.02 0.15 1.59 1.74 0.15 0.40 0.55 45.5 2,469 2,514 2.69 0.09 2.45 2,610 Annual — — — — — — — — — — — — — — — — — —
Mobile 0.16 0.14 0.11 1.17 < 0.005 < 0.005 0.29 0.29 < 0.005 0.07 0.08 — 276 276 0.01 0.01 0.34 281 Area 0.33 0.31 0.02 0.70 < 0.005 0.02 — 0.02 0.02 — 0.02 3.48 12.7 16.2 0.02 < 0.005 — 16.6 Energy < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 116 116 0.01 < 0.005 — 116 Water — — — — — — — — — — — 0.61 4.15 4.76 0.06 < 0.005 — 6.80 Waste — — — — — — — — — — — 3.43 0.00 3.43 0.34 0.00 — 12.0 Refrig. — — — — — — — — — — — — — — — — 0.06 0.06
Total 0.49 0.45 0.16 1.88 < 0.005 0.03 0.29 0.32 0.03 0.07 0.10 7.53 409 416 0.45 0.01 0.41 432
3. Construction Emissions Details
3.1. Demolition (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
17 / 82
Off-Roa
Equipment
0.68 0.56 5.16 6.67 0.01 0.18 — 0.18 0.17 — 0.17 — 994 994 0.04 0.01 — 997 Demoliti
on
— — — — — — 0.75 0.75 — 0.11 0.11 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.08 0.07 0.61 0.79 < 0.005 0.02 — 0.02 0.02 — 0.02 — 117 117 < 0.005 < 0.005 — 117 Demoliti
on
— — — — — — 0.09 0.09 — 0.01 0.01 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.11 0.14 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 19.4 19.4 < 0.005 < 0.005 — 19.5 Demoliti
on
— — — — — — 0.02 0.02 — < 0.005 < 0.005 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.06 0.74 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 164 164 0.01 0.01 0.02 166 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.05 0.01 0.77 0.29 < 0.005 0.01 0.16 0.17 0.01 0.04 0.05 — 601 601 0.03 0.09 0.04 630 412 N Oakhurst Drive Detailed Report, 8/1/2024
18 / 82
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.09 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 19.6 19.6 < 0.005 < 0.005 0.03 19.8 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 < 0.005 0.09 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 — 70.8 70.8 < 0.005 0.01 0.07 74.3 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 3.24 3.24 < 0.005 < 0.005 0.01 3.29 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 11.7 11.7 < 0.005 < 0.005 0.01 12.3
3.2. Demolition (2025) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.68 0.56 5.16 6.67 0.01 0.18 — 0.18 0.17 — 0.17 — 994 994 0.04 0.01 — 997 Demoliti
on
— — — — — — 0.48 0.48 — 0.07 0.07 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
19 / 82
Off-Roa 0.08 0.07 0.61 0.79 < 0.005 0.02 — 0.02 0.02 — 0.02 — 117 117 < 0.005 < 0.005 — 117 d
Equipm
ent
Demoliti
on
— — — — — — 0.06 0.06 — 0.01 0.01 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.11 0.14 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 19.4 19.4 < 0.005 < 0.005 — 19.5 Demoliti
on
— — — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.06 0.74 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 164 164 0.01 0.01 0.02 166 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.05 0.01 0.77 0.29 < 0.005 0.01 0.16 0.17 0.01 0.04 0.05 — 601 601 0.03 0.09 0.04 630 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.09 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 19.6 19.6 < 0.005 < 0.005 0.03 19.8 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 < 0.005 0.09 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 — 70.8 70.8 < 0.005 0.01 0.07 74.3 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 3.24 3.24 < 0.005 < 0.005 0.01 3.29 412 N Oakhurst Drive Detailed Report, 8/1/2024
20 / 82
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 11.7 11.7 < 0.005 < 0.005 0.01 12.3
3.3. Grading (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.29 1.09 10.1 10.0 0.02 0.46 — 0.46 0.43 — 0.43 — 1,714 1,714 0.07 0.01 — 1,720 Dust
From
Material
Movement
— — — — — — 5.32 5.32 — 2.57 2.57 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.08 0.07 0.61 0.61 < 0.005 0.03 — 0.03 0.03 — 0.03 — 104 104 < 0.005 < 0.005 — 104 Dust
From
Material
Movement
— — — — — — 0.32 0.32 — 0.16 0.16 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 412 N Oakhurst Drive Detailed Report, 8/1/2024
21 / 82
Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.11 0.11 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 — 17.2 17.2 < 0.005 < 0.005 — 17.3 Dust
From
Material
Movement
— — — — — — 0.06 0.06 — 0.03 0.03 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04 0.03 0.04 0.44 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 98.3 98.3 < 0.005 < 0.005 0.01 99.5 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.07 0.01 1.20 0.45 0.01 0.01 0.25 0.26 0.01 0.07 0.08 — 941 941 0.05 0.15 0.06 986 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 6.05 6.05 < 0.005 < 0.005 0.01 6.13 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.07 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 — 57.0 57.0 < 0.005 0.01 0.06 59.8 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.00 1.00 < 0.005 < 0.005 < 0.005 1.02 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 9.44 9.44 < 0.005 < 0.005 0.01 9.91
3.4. Grading (2025) - Mitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
22 / 82
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.29 1.09 10.1 10.0 0.02 0.46 — 0.46 0.43 — 0.43 — 1,714 1,714 0.07 0.01 — 1,720 Dust
From
Material
Movement
— — — — — — 1.38 1.38 — 0.67 0.67 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.08 0.07 0.61 0.61 < 0.005 0.03 — 0.03 0.03 — 0.03 — 104 104 < 0.005 < 0.005 — 104 Dust
From
Material
Movement
— — — — — — 0.08 0.08 — 0.04 0.04 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01 0.01 0.11 0.11 < 0.005 0.01 — 0.01 < 0.005 — < 0.005 — 17.2 17.2 < 0.005 < 0.005 — 17.3 412 N Oakhurst Drive Detailed Report, 8/1/2024
23 / 82
Dust — — — — — — 0.02 0.02 — 0.01 0.01 — — — — — — —
From
Material
Movement
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04 0.03 0.04 0.44 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 98.3 98.3 < 0.005 < 0.005 0.01 99.5 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.07 0.01 1.20 0.45 0.01 0.01 0.25 0.26 0.01 0.07 0.08 — 941 941 0.05 0.15 0.06 986 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 6.05 6.05 < 0.005 < 0.005 0.01 6.13 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.07 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 — 57.0 57.0 < 0.005 0.01 0.06 59.8 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.00 1.00 < 0.005 < 0.005 < 0.005 1.02 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 9.44 9.44 < 0.005 < 0.005 0.01 9.91
3.5. Grading (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
24 / 82
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Off-Roa
d
Equipm
ent
1.22 1.02 9.19 9.69 0.02 0.42 — 0.42 0.39 — 0.39 — 1,714 1,714 0.07 0.01 — 1,720 Dust
From
Material
Movement
— — — — — — 5.32 5.32 — 2.57 2.57 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.22 1.02 9.19 9.69 0.02 0.42 — 0.42 0.39 — 0.39 — 1,714 1,714 0.07 0.01 — 1,720 Dust
From
Material
Movement
— — — — — — 5.32 5.32 — 2.57 2.57 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.51 0.43 3.81 4.02 0.01 0.17 — 0.17 0.16 — 0.16 — 711 711 0.03 0.01 — 714 Dust
From
Material
Movement
— — — — — — 2.21 2.21 — 1.07 1.07 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 412 N Oakhurst Drive Detailed Report, 8/1/2024
25 / 82
Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.09 0.08 0.70 0.73 < 0.005 0.03 — 0.03 0.03 — 0.03 — 118 118 < 0.005 < 0.005 — 118 Dust
From
Material
Movement
— — — — — — 0.40 0.40 — 0.19 0.19 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.48 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 102 102 < 0.005 < 0.005 0.34 103 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.07 0.01 1.11 0.44 0.01 0.01 0.25 0.26 0.01 0.07 0.08 — 923 923 0.05 0.15 2.07 970 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.41 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 96.3 96.3 < 0.005 < 0.005 0.01 97.5 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.07 0.01 1.16 0.44 0.01 0.01 0.25 0.26 0.01 0.07 0.08 — 924 924 0.05 0.15 0.05 969 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.18 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 40.6 40.6 < 0.005 < 0.005 0.06 41.1 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.03 0.01 0.48 0.18 < 0.005 < 0.005 0.10 0.11 < 0.005 0.03 0.03 — 383 383 0.02 0.06 0.37 402 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 6.71 6.71 < 0.005 < 0.005 0.01 6.80 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 < 0.005 0.09 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 — 63.4 63.4 < 0.005 0.01 0.06 66.6 412 N Oakhurst Drive Detailed Report, 8/1/2024
26 / 82
3.6. Grading (2026) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.22 1.02 9.19 9.69 0.02 0.42 — 0.42 0.39 — 0.39 — 1,714 1,714 0.07 0.01 — 1,720 Dust
From
Material
Movement
— — — — — — 1.38 1.38 — 0.67 0.67 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.22 1.02 9.19 9.69 0.02 0.42 — 0.42 0.39 — 0.39 — 1,714 1,714 0.07 0.01 — 1,720 Dust
From
Material
Movement
— — — — — — 1.38 1.38 — 0.67 0.67 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.51 0.43 3.81 4.02 0.01 0.17 — 0.17 0.16 — 0.16 — 711 711 0.03 0.01 — 714 412 N Oakhurst Drive Detailed Report, 8/1/2024
27 / 82
Dust
From
Material
Movement
— — — — — — 0.57 0.57 — 0.28 0.28 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.09 0.08 0.70 0.73 < 0.005 0.03 — 0.03 0.03 — 0.03 — 118 118 < 0.005 < 0.005 — 118 Dust
From
Material
Movement
— — — — — — 0.10 0.10 — 0.05 0.05 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.48 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 102 102 < 0.005 < 0.005 0.34 103 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.07 0.01 1.11 0.44 0.01 0.01 0.25 0.26 0.01 0.07 0.08 — 923 923 0.05 0.15 2.07 970 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.41 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 96.3 96.3 < 0.005 < 0.005 0.01 97.5 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.07 0.01 1.16 0.44 0.01 0.01 0.25 0.26 0.01 0.07 0.08 — 924 924 0.05 0.15 0.05 969 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.18 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 40.6 40.6 < 0.005 < 0.005 0.06 41.1 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 412 N Oakhurst Drive Detailed Report, 8/1/2024
28 / 82
Hauling 0.03 0.01 0.48 0.18 < 0.005 < 0.005 0.10 0.11 < 0.005 0.03 0.03 — 383 383 0.02 0.06 0.37 402 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 6.71 6.71 < 0.005 < 0.005 0.01 6.80 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.01 < 0.005 0.09 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 — 63.4 63.4 < 0.005 0.01 0.06 66.6
3.7. Building Construction (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.38 1.15 9.95 12.7 0.02 0.34 — 0.34 0.31 — 0.31 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.38 1.15 9.95 12.7 0.02 0.34 — 0.34 0.31 — 0.31 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.41 0.35 2.98 3.81 0.01 0.10 — 0.10 0.09 — 0.09 — 627 627 0.03 0.01 — 629 412 N Oakhurst Drive Detailed Report, 8/1/2024
29 / 82
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.08 0.06 0.54 0.70 < 0.005 0.02 — 0.02 0.02 — 0.02 — 104 104 < 0.005 < 0.005 — 104 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.21 0.18 0.19 3.23 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 678 678 0.03 0.02 2.29 688 Vendor 0.02 0.01 0.36 0.17 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 327 327 0.01 0.05 0.88 342 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.21 0.18 0.22 2.76 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 643 643 0.03 0.02 0.06 651 Vendor 0.02 0.01 0.38 0.18 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 327 327 0.01 0.05 0.02 341 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.07 0.86 0.00 0.00 0.19 0.19 0.00 0.05 0.05 — 195 195 0.01 0.01 0.30 198 Vendor 0.01 < 0.005 0.11 0.05 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 97.8 97.8 < 0.005 0.01 0.11 102 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.16 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 32.3 32.3 < 0.005 < 0.005 0.05 32.8 Vendor < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 — 16.2 16.2 < 0.005 < 0.005 0.02 16.9 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 412 N Oakhurst Drive Detailed Report, 8/1/2024
30 / 82
3.8. Building Construction (2026) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.38 1.15 9.95 12.7 0.02 0.34 — 0.34 0.31 — 0.31 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.38 1.15 9.95 12.7 0.02 0.34 — 0.34 0.31 — 0.31 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.41 0.35 2.98 3.81 0.01 0.10 — 0.10 0.09 — 0.09 — 627 627 0.03 0.01 — 629 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.08 0.06 0.54 0.70 < 0.005 0.02 — 0.02 0.02 — 0.02 — 104 104 < 0.005 < 0.005 — 104 412 N Oakhurst Drive Detailed Report, 8/1/2024
31 / 82
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.21 0.18 0.19 3.23 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 678 678 0.03 0.02 2.29 688 Vendor 0.02 0.01 0.36 0.17 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 327 327 0.01 0.05 0.88 342 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.21 0.18 0.22 2.76 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 643 643 0.03 0.02 0.06 651 Vendor 0.02 0.01 0.38 0.18 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 327 327 0.01 0.05 0.02 341 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.07 0.86 0.00 0.00 0.19 0.19 0.00 0.05 0.05 — 195 195 0.01 0.01 0.30 198 Vendor 0.01 < 0.005 0.11 0.05 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 97.8 97.8 < 0.005 0.01 0.11 102 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.16 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 32.3 32.3 < 0.005 < 0.005 0.05 32.8 Vendor < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 — 16.2 16.2 < 0.005 < 0.005 0.02 16.9 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.9. Building Construction (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
32 / 82
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Off-Roa
d
Equipm
ent
1.33 1.10 9.59 12.7 0.02 0.30 — 0.30 0.27 — 0.27 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.33 1.10 9.59 12.7 0.02 0.30 — 0.30 0.27 — 0.27 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.95 0.79 6.85 9.07 0.02 0.21 — 0.21 0.20 — 0.20 — 1,496 1,496 0.06 0.01 — 1,501 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.17 0.14 1.25 1.65 < 0.005 0.04 — 0.04 0.04 — 0.04 — 248 248 0.01 < 0.005 — 248 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
33 / 82
Worker 0.20 0.18 0.17 3.01 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 665 665 0.03 0.02 2.07 675 Vendor 0.02 0.01 0.34 0.16 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 320 320 0.01 0.04 0.84 335 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.20 0.17 0.22 2.55 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 630 630 0.01 0.02 0.05 638 Vendor 0.02 0.01 0.36 0.17 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 320 320 0.01 0.04 0.02 334 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.14 0.12 0.15 1.91 0.00 0.00 0.46 0.46 0.00 0.11 0.11 — 457 457 0.01 0.02 0.64 463 Vendor 0.02 0.01 0.26 0.12 < 0.005 < 0.005 0.06 0.07 < 0.005 0.02 0.02 — 229 229 0.01 0.03 0.26 239 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.03 0.02 0.03 0.35 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 75.7 75.7 < 0.005 < 0.005 0.11 76.6 Vendor < 0.005 < 0.005 0.05 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 37.9 37.9 < 0.005 0.01 0.04 39.5 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.10. Building Construction (2027) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.33 1.10 9.59 12.7 0.02 0.30 — 0.30 0.27 — 0.27 — 2,094 2,094 0.08 0.02 — 2,101 412 N Oakhurst Drive Detailed Report, 8/1/2024
34 / 82
Onsite 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 truck
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.33 1.10 9.59 12.7 0.02 0.30 — 0.30 0.27 — 0.27 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.95 0.79 6.85 9.07 0.02 0.21 — 0.21 0.20 — 0.20 — 1,496 1,496 0.06 0.01 — 1,501 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.17 0.14 1.25 1.65 < 0.005 0.04 — 0.04 0.04 — 0.04 — 248 248 0.01 < 0.005 — 248 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.20 0.18 0.17 3.01 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 665 665 0.03 0.02 2.07 675 Vendor 0.02 0.01 0.34 0.16 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 320 320 0.01 0.04 0.84 335 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
35 / 82
Worker 0.20 0.17 0.22 2.55 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 630 630 0.01 0.02 0.05 638 Vendor 0.02 0.01 0.36 0.17 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 320 320 0.01 0.04 0.02 334 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.14 0.12 0.15 1.91 0.00 0.00 0.46 0.46 0.00 0.11 0.11 — 457 457 0.01 0.02 0.64 463 Vendor 0.02 0.01 0.26 0.12 < 0.005 < 0.005 0.06 0.07 < 0.005 0.02 0.02 — 229 229 0.01 0.03 0.26 239 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.03 0.02 0.03 0.35 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 75.7 75.7 < 0.005 < 0.005 0.11 76.6 Vendor < 0.005 < 0.005 0.05 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 37.9 37.9 < 0.005 0.01 0.04 39.5 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.11. Building Construction (2028) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.28 1.06 9.23 12.7 0.02 0.26 — 0.26 0.24 — 0.24 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
36 / 82
Off-Roa 0.23 0.19 1.64 2.26 < 0.005 0.05 — 0.05 0.04 — 0.04 — 373 373 0.02 < 0.005 — 374 d
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.04 0.03 0.30 0.41 < 0.005 0.01 — 0.01 0.01 — 0.01 — 61.7 61.7 < 0.005 < 0.005 — 62.0 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.19 0.17 0.19 2.40 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 619 619 0.01 0.02 0.05 627 Vendor 0.02 0.01 0.34 0.16 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 313 313 0.01 0.04 0.02 326 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.45 0.00 0.00 0.12 0.12 0.00 0.03 0.03 — 112 112 < 0.005 < 0.005 0.14 113 Vendor < 0.005 < 0.005 0.06 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 — 55.7 55.7 < 0.005 0.01 0.06 58.2 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.08 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 18.5 18.5 < 0.005 < 0.005 0.02 18.8 Vendor < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 9.23 9.23 < 0.005 < 0.005 0.01 9.63 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.12. Building Construction (2028) - Mitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
37 / 82
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.28 1.06 9.23 12.7 0.02 0.26 — 0.26 0.24 — 0.24 — 2,094 2,094 0.08 0.02 — 2,101 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.23 0.19 1.64 2.26 < 0.005 0.05 — 0.05 0.04 — 0.04 — 373 373 0.02 < 0.005 — 374 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.04 0.03 0.30 0.41 < 0.005 0.01 — 0.01 0.01 — 0.01 — 61.7 61.7 < 0.005 < 0.005 — 62.0 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
38 / 82
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Worker 0.19 0.17 0.19 2.40 0.00 0.00 0.65 0.65 0.00 0.15 0.15 — 619 619 0.01 0.02 0.05 627 Vendor 0.02 0.01 0.34 0.16 < 0.005 < 0.005 0.09 0.09 < 0.005 0.02 0.03 — 313 313 0.01 0.04 0.02 326 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.45 0.00 0.00 0.12 0.12 0.00 0.03 0.03 — 112 112 < 0.005 < 0.005 0.14 113 Vendor < 0.005 < 0.005 0.06 0.03 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 — 55.7 55.7 < 0.005 0.01 0.06 58.2 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.08 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 18.5 18.5 < 0.005 < 0.005 0.02 18.8 Vendor < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 9.23 9.23 < 0.005 < 0.005 0.01 9.63 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.13. Architectural Coating (2028) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.13 0.11 0.81 1.12 < 0.005 0.02 — 0.02 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architect
ural
Coating
s
7.95 7.95 — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
39 / 82
Onsite 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 truck
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.02 0.01 0.10 0.13 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 15.7 15.7 < 0.005 < 0.005 — 15.8 Architect
ural
Coating
s
0.94 0.94 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
< 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 2.60 2.60 < 0.005 < 0.005 — 2.61 Architect
ural
Coating
s
0.17 0.17 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04 0.03 0.03 0.56 0.00 0.00 0.13 0.13 0.00 0.03 0.03 — 131 131 < 0.005 < 0.005 0.37 132 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 412 N Oakhurst Drive Detailed Report, 8/1/2024
40 / 82
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.06 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 14.8 14.8 < 0.005 < 0.005 0.02 15.0 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.45 2.45 < 0.005 < 0.005 < 0.005 2.48 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.14. Architectural Coating (2028) - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.13 0.11 0.81 1.12 < 0.005 0.02 — 0.02 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architect
ural
Coating
s
7.95 7.95 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
41 / 82
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.02 0.01 0.10 0.13 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 15.7 15.7 < 0.005 < 0.005 — 15.8 Architect
ural
Coating
s
0.94 0.94 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
< 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 2.60 2.60 < 0.005 < 0.005 — 2.61 Architect
ural
Coating
s
0.17 0.17 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04 0.03 0.03 0.56 0.00 0.00 0.13 0.13 0.00 0.03 0.03 — 131 131 < 0.005 < 0.005 0.37 132 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.06 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 14.8 14.8 < 0.005 < 0.005 0.02 15.0 412 N Oakhurst Drive Detailed Report, 8/1/2024
42 / 82
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.45 2.45 < 0.005 < 0.005 < 0.005 2.48 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.94 0.85 0.60 7.15 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,811 1,811 0.08 0.07 5.01 1,839 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.94 0.85 0.60 7.15 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,811 1,811 0.08 0.07 5.01 1,839 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.93 0.84 0.66 6.60 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,736 1,736 0.09 0.07 0.13 1,760 412 N Oakhurst Drive Detailed Report, 8/1/2024
43 / 82
Enclose
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.93 0.84 0.66 6.60 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,736 1,736 0.09 0.07 0.13 1,760 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.16 0.14 0.11 1.17 < 0.005 < 0.005 0.29 0.29 < 0.005 0.07 0.08 — 276 276 0.01 0.01 0.34 281 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.16 0.14 0.11 1.17 < 0.005 < 0.005 0.29 0.29 < 0.005 0.07 0.08 — 276 276 0.01 0.01 0.34 281
4.1.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.94 0.85 0.60 7.15 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,811 1,811 0.08 0.07 5.01 1,839 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.94 0.85 0.60 7.15 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,811 1,811 0.08 0.07 5.01 1,839 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
44 / 82
Apartme 0.93 0.84 0.66 6.60 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,736 1,736 0.09 0.07 0.13 1,760 nts
Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.93 0.84 0.66 6.60 0.02 0.01 1.69 1.70 0.01 0.43 0.44 — 1,736 1,736 0.09 0.07 0.13 1,760 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.16 0.14 0.11 1.17 < 0.005 < 0.005 0.29 0.29 < 0.005 0.07 0.08 — 276 276 0.01 0.01 0.34 281 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.16 0.14 0.11 1.17 < 0.005 < 0.005 0.29 0.29 < 0.005 0.07 0.08 — 276 276 0.01 0.01 0.34 281
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 323 323 0.02 < 0.005 — 324
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — — 209 209 0.01 < 0.005 — 210
412 N Oakhurst Drive Detailed Report, 8/1/2024
45 / 82
Total — — — — — — — — — — — — 532 532 0.04 0.01 — 535
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 323 323 0.02 < 0.005 — 324
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — — 209 209 0.01 < 0.005 — 210
Total — — — — — — — — — — — — 532 532 0.04 0.01 — 535
Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 53.5 53.5 < 0.005 < 0.005 — 53.7 Enclose
d
Parking
with
Elevator
— — — — — — — — — — — — 34.7 34.7 < 0.005 < 0.005 — 34.8 Total — — — — — — — — — — — — 88.1 88.1 0.01 < 0.005 — 88.6
4.2.2. Electricity Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 323 323 0.02 < 0.005 — 324
412 N Oakhurst Drive Detailed Report, 8/1/2024
46 / 82
Enclose — — — — — — — — — — — — 209 209 0.01 < 0.005 — 210 d
Parking
with
Elevator
Total — — — — — — — — — — — — 532 532 0.04 0.01 — 535
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 323 323 0.02 < 0.005 — 324
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — — 209 209 0.01 < 0.005 — 210
Total — — — — — — — — — — — — 532 532 0.04 0.01 — 535
Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 53.5 53.5 < 0.005 < 0.005 — 53.7 Enclose
d
Parking
with
Elevator
— — — — — — — — — — — — 34.7 34.7 < 0.005 < 0.005 — 34.8 Total — — — — — — — — — — — — 88.1 88.1 0.01 < 0.005 — 88.6
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
47 / 82
Apartme
Mid Rise
0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
< 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 27.4 27.4 < 0.005 < 0.005 — 27.5 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 27.4 27.4 < 0.005 < 0.005 — 27.5
4.2.4. Natural Gas Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 412 N Oakhurst Drive Detailed Report, 8/1/2024
48 / 82
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Apartme
nts
Mid Rise
0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.02 0.01 0.13 0.06 < 0.005 0.01 — 0.01 0.01 — 0.01 — 165 165 0.01 < 0.005 — 166 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
< 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 27.4 27.4 < 0.005 < 0.005 — 27.5 Enclose
d
Parking
with
Elevator
0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 27.4 27.4 < 0.005 < 0.005 — 27.5
4.3. Area Emissions by Source
412 N Oakhurst Drive Detailed Report, 8/1/2024
49 / 82
4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 2.93 1.45 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Consum
er
Product
s
1.17 1.17 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.09 0.09 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
0.50 0.47 0.04 4.26 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 13.3 13.3 < 0.005 < 0.005 — 13.3 Total 4.70 3.18 1.02 17.3 0.05 1.89 — 1.89 1.82 — 1.82 307 999 1,306 1.45 < 0.005 — 1,342 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 2.93 1.45 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Consum
er
Product
s
1.17 1.17 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.09 0.09 — — — — — — — — — — — — — — — —
Total 4.19 2.71 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Annual — — — — — — — — — — — — — — — — — —
Hearths 0.04 0.02 0.01 0.16 < 0.005 0.02 — 0.02 0.02 — 0.02 3.48 11.2 14.7 0.02 < 0.005 — 15.1 412 N Oakhurst Drive Detailed Report, 8/1/2024
50 / 82
Consum
Products
0.21 0.21 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.02 0.02 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
0.06 0.06 < 0.005 0.53 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.50 1.50 < 0.005 < 0.005 — 1.51 Total 0.33 0.31 0.02 0.70 < 0.005 0.02 — 0.02 0.02 — 0.02 3.48 12.7 16.2 0.02 < 0.005 — 16.6
4.3.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 2.93 1.45 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Consum
er
Product
s
1.17 1.17 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.09 0.09 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
0.50 0.47 0.04 4.26 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 13.3 13.3 < 0.005 < 0.005 — 13.3 Total 4.70 3.18 1.02 17.3 0.05 1.89 — 1.89 1.82 — 1.82 307 999 1,306 1.45 < 0.005 — 1,342 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 2.93 1.45 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 412 N Oakhurst Drive Detailed Report, 8/1/2024
51 / 82
Consum
Products
1.17 1.17 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.09 0.09 — — — — — — — — — — — — — — — —
Total 4.19 2.71 0.98 13.1 0.05 1.88 — 1.88 1.81 — 1.81 307 985 1,292 1.45 < 0.005 — 1,329 Annual — — — — — — — — — — — — — — — — — —
Hearths 0.04 0.02 0.01 0.16 < 0.005 0.02 — 0.02 0.02 — 0.02 3.48 11.2 14.7 0.02 < 0.005 — 15.1 Consum
er
Product
s
0.21 0.21 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s
0.02 0.02 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent
0.06 0.06 < 0.005 0.53 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.50 1.50 < 0.005 < 0.005 — 1.51 Total 0.33 0.31 0.02 0.70 < 0.005 0.02 — 0.02 0.02 — 0.02 3.48 12.7 16.2 0.02 < 0.005 — 16.6
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1
412 N Oakhurst Drive Detailed Report, 8/1/2024
52 / 82
Enclose
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 0.61 4.15 4.76 0.06 < 0.005 — 6.80 Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 0.61 4.15 4.76 0.06 < 0.005 — 6.80
4.4.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
53 / 82
Apartme — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 nts
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.71 25.0 28.8 0.38 0.01 — 41.1 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 0.61 4.15 4.76 0.06 < 0.005 — 6.80 Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 0.61 4.15 4.76 0.06 < 0.005 — 6.80
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 412 N Oakhurst Drive Detailed Report, 8/1/2024
54 / 82
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 3.43 0.00 3.43 0.34 0.00 — 12.0
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.43 0.00 3.43 0.34 0.00 — 12.0 412 N Oakhurst Drive Detailed Report, 8/1/2024
55 / 82
4.5.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5
Enclose
d
Parking
with
Elevator
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 20.7 0.00 20.7 2.07 0.00 — 72.5 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 3.43 0.00 3.43 0.34 0.00 — 12.0
412 N Oakhurst Drive Detailed Report, 8/1/2024
56 / 82
Enclose — — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00 d
Parking
with
Elevator
Total — — — — — — — — — — — 3.43 0.00 3.43 0.34 0.00 — 12.0
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 0.39 0.39
Total — — — — — — — — — — — — — — — — 0.39 0.39
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 0.39 0.39
Total — — — — — — — — — — — — — — — — 0.39 0.39
Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 0.06 0.06
Total — — — — — — — — — — — — — — — — 0.06 0.06
4.6.2. Mitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
57 / 82
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 0.39 0.39
Total — — — — — — — — — — — — — — — — 0.39 0.39
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 0.39 0.39
Total — — — — — — — — — — — — — — — — 0.39 0.39
Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 0.06 0.06
Total — — — — — — — — — — — — — — — — 0.06 0.06
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
58 / 82
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.7.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
59 / 82
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 412 N Oakhurst Drive Detailed Report, 8/1/2024
60 / 82
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.9.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 412 N Oakhurst Drive Detailed Report, 8/1/2024
61 / 82
Vegetati TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e on
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 412 N Oakhurst Drive Detailed Report, 8/1/2024
62 / 82
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
63 / 82
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
64 / 82
4.10.6. Avoided and Sequestered Emissions by Species - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
412 N Oakhurst Drive Detailed Report, 8/1/2024
65 / 82
Sequest — — — — — — — — — — — — — — — — — —
ered
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 10/1/2025 11/30/2025 5.00 43.0 —
Grading Grading 12/1/2025 7/31/2026 5.00 175 —
Building Construction Building Construction 8/1/2026 3/31/2028 5.00 435 — Architectural Coating Architectural Coating 4/1/2028 5/31/2028 5.00 43.0 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Tractors/Loaders/Back
hoes
Diesel Average 2.00 6.00 84.0 0.37
Demolition Rubber Tired Dozers Diesel Average 1.00 1.00 367 0.40 Demolition Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Demolition Excavators Diesel Average 1.00 8.00 36.0 0.38 Grading Graders Diesel Average 1.00 6.00 148 0.41
Grading Rubber Tired Dozers Diesel Average 1.00 6.00 367 0.40 412 N Oakhurst Drive Detailed Report, 8/1/2024
66 / 82
Grading Tractors/Loaders/Back Diesel Average 1.00 7.00 84.0 0.37 Building Construction Cranes Diesel Average 1.00 4.00 367 0.29 Building Construction Forklifts Diesel Average 2.00 6.00 82.0 0.20 Building Construction Tractors/Loaders/Back
hoes
Diesel Average 2.00 8.00 84.0 0.37
Building Construction Air Compressors Diesel Average 1.00 8.00 37.0 0.48 Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 Building Construction Welders Diesel Average 1.00 8.00 46.0 0.45 Building Construction Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Building Construction Cement and Mortar
Mixers
Diesel Average 1.00 8.00 10.0 0.56
Architectural Coating Air Compressors Diesel Average 1.00 6.00 37.0 0.48
5.2.2. Mitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Tractors/Loaders/Back
hoes
Diesel Average 2.00 6.00 84.0 0.37
Demolition Rubber Tired Dozers Diesel Average 1.00 1.00 367 0.40 Demolition Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Demolition Excavators Diesel Average 1.00 8.00 36.0 0.38 Grading Graders Diesel Average 1.00 6.00 148 0.41
Grading Rubber Tired Dozers Diesel Average 1.00 6.00 367 0.40 Grading Tractors/Loaders/Back
hoes
Diesel Average 1.00 7.00 84.0 0.37
Building Construction Cranes Diesel Average 1.00 4.00 367 0.29 Building Construction Forklifts Diesel Average 2.00 6.00 82.0 0.20 Building Construction Tractors/Loaders/Back
hoes
Diesel Average 2.00 8.00 84.0 0.37
Building Construction Air Compressors Diesel Average 1.00 8.00 37.0 0.48 412 N Oakhurst Drive Detailed Report, 8/1/2024
67 / 82
Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 Building Construction Welders Diesel Average 1.00 8.00 46.0 0.45 Building Construction Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Building Construction Cement and Mortar
Mixers
Diesel Average 1.00 8.00 10.0 0.56
Architectural Coating Air Compressors Diesel Average 1.00 6.00 37.0 0.48
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition — — — —
Demolition Worker 12.5 18.5 LDA,LDT1,LDT2
Demolition Vendor — 10.2 HHDT,MHDT
Demolition Hauling 8.67 20.0 HHDT
Demolition Onsite truck — — HHDT
Grading — — — —
Grading Worker 7.50 18.5 LDA,LDT1,LDT2
Grading Vendor — 10.2 HHDT,MHDT
Grading Hauling 13.6 20.0 HHDT
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 50.0 18.5 LDA,LDT1,LDT2
Building Construction Vendor 10.5 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck — — HHDT
Architectural Coating — — — —
Architectural Coating Worker 10.0 18.5 LDA,LDT1,LDT2
412 N Oakhurst Drive Detailed Report, 8/1/2024
68 / 82
Architectural Coating Vendor — 10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT
5.3.2. Mitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition — — — —
Demolition Worker 12.5 18.5 LDA,LDT1,LDT2
Demolition Vendor — 10.2 HHDT,MHDT
Demolition Hauling 8.67 20.0 HHDT
Demolition Onsite truck — — HHDT
Grading — — — —
Grading Worker 7.50 18.5 LDA,LDT1,LDT2
Grading Vendor — 10.2 HHDT,MHDT
Grading Hauling 13.6 20.0 HHDT
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 50.0 18.5 LDA,LDT1,LDT2
Building Construction Vendor 10.5 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck — — HHDT
Architectural Coating — — — —
Architectural Coating Worker 10.0 18.5 LDA,LDT1,LDT2
Architectural Coating Vendor — 10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT
412 N Oakhurst Drive Detailed Report, 8/1/2024
69 / 82
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 110,603 36,868 0.00 0.00 —
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (Cubic
Yards)
Material Exported (Cubic
Yards)
Acres Graded (acres) Material Demolished (Building
Square Footage)
Acres Paved (acres)
Demolition 0.00 0.00 0.00 32,400 —
Grading — 19,000 131 0.00 —
5.6.2. Construction Earthmoving Control Strategies
Non-applicable. No control strategies activated by user.
5.7. Construction Paving
Land Use Area Paved (acres) % Asphalt
Apartments Mid Rise — 0%
Enclosed Parking with Elevator 0.00 100%
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
412 N Oakhurst Drive Detailed Report, 8/1/2024
70 / 82
2025 0.00 690 0.05 0.01
2026 0.00 690 0.05 0.01
2027 0.00 690 0.05 0.01
2028 0.00 690 0.05 0.01
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Apartments Mid
Rise
283 255 213 98,154 2,383 2,150 1,791 826,698
Enclosed Parking
with Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Apartments Mid
Rise
283 255 213 98,154 2,383 2,150 1,791 826,698
Enclosed Parking
with Elevator
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
Hearth Type Unmitigated (number)
Apartments Mid Rise —
Wood Fireplaces 0
Gas Fireplaces 47
412 N Oakhurst Drive Detailed Report, 8/1/2024
71 / 82
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 5
Conventional Wood Stoves 0
Catalytic Wood Stoves 3
Non-Catalytic Wood Stoves 3
Pellet Wood Stoves 0
5.10.1.2. Mitigated
Hearth Type Unmitigated (number)
Apartments Mid Rise —
Wood Fireplaces 0
Gas Fireplaces 47
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 5
Conventional Wood Stoves 0
Catalytic Wood Stoves 3
Non-Catalytic Wood Stoves 3
Pellet Wood Stoves 0
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq
ft)
Residential Exterior Area Coated (sq
ft)
Non-Residential Interior Area Coated
(sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
110603.47499999999 36,868 0.00 0.00 —
5.10.3. Landscape Equipment
412 N Oakhurst Drive Detailed Report, 8/1/2024
72 / 82
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.10.4. Landscape Equipment - Mitigated
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Apartments Mid Rise 170,742 690 0.0489 0.0069 516,119
Enclosed Parking with
Elevator
110,743 690 0.0489 0.0069 0.00
5.11.2. Mitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Apartments Mid Rise 170,742 690 0.0489 0.0069 516,119
Enclosed Parking with
Elevator
110,743 690 0.0489 0.0069 0.00
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
73 / 82
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Apartments Mid Rise 1,938,238 8,193
Enclosed Parking with Elevator 0.00 0.00
5.12.2. Mitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Apartments Mid Rise 1,938,238 8,193
Enclosed Parking with Elevator 0.00 0.00
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Apartments Mid Rise 38.5 —
Enclosed Parking with Elevator 0.00 —
5.13.2. Mitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Apartments Mid Rise 38.5 —
Enclosed Parking with Elevator 0.00 —
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Apartments Mid Rise Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
412 N Oakhurst Drive Detailed Report, 8/1/2024
74 / 82
Apartments Mid Rise Household
refrigerators and/or
freezers
R-134a 1,430 0.12 0.60 0.00 1.00
5.14.2. Mitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Apartments Mid Rise Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Apartments Mid Rise Household
refrigerators and/or
freezers
R-134a 1,430 0.12 0.60 0.00 1.00
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.15.2. Mitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor
5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr) Daily Heat Input (MMBtu/day) Annual Heat Input (MMBtu/yr) 412 N Oakhurst Drive Detailed Report, 8/1/2024
75 / 82
5.17. User Defined
Equipment Type Fuel Type
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
5.18.2.2. Mitigated
412 N Oakhurst Drive Detailed Report, 8/1/2024
76 / 82
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 7.73 annual days of extreme heat Extreme Precipitation 7.05 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.30 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
412 N Oakhurst Drive Detailed Report, 8/1/2024
77 / 82
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. 412 N Oakhurst Drive Detailed Report, 8/1/2024
78 / 82
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 57.8
AQ-PM 65.4
AQ-DPM 78.6
Drinking Water 94.3
Lead Risk Housing 16.4
Pesticides 0.00
Toxic Releases 74.1
Traffic 51.1
Effect Indicators —
CleanUp Sites 59.3
Groundwater 36.2
Haz Waste Facilities/Generators 62.6
Impaired Water Bodies 0.00
Solid Waste 73.0
Sensitive Population —
Asthma 15.2
Cardio-vascular 40.3
Low Birth Weights 36.1
Socioeconomic Factor Indicators —
Education 24.6
Housing 81.8
Linguistic 37.0
Poverty 30.8
Unemployment 22.6
7.2. Healthy Places Index Scores
412 N Oakhurst Drive Detailed Report, 8/1/2024
79 / 82
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 50.72500962
Employed 91.65918132
Median HI 45.06608495
Education —
Bachelor's or higher 95.30347748
High school enrollment 100
Preschool enrollment 86.52636982
Transportation —
Auto Access 42.10188631
Active commuting 67.66328757
Social —
2-parent households 0.128320287
Voting 28.84640062
Neighborhood —
Alcohol availability 38.77839086
Park access 4.59386629
Retail density 99.30707045
Supermarket access 94.25125112
Tree canopy 23.49544463
Housing —
Homeownership 14.5515206
Housing habitability 16.68163737
Low-inc homeowner severe housing cost burden 1.539843449 Low-inc renter severe housing cost burden 76.08109842
Uncrowded housing 96.93314513
Health Outcomes —
412 N Oakhurst Drive Detailed Report, 8/1/2024
80 / 82
Insured adults 84.88387014
Arthritis 63.4
Asthma ER Admissions 81.1
High Blood Pressure 70.1
Cancer (excluding skin) 18.5
Asthma 65.7
Coronary Heart Disease 63.8
Chronic Obstructive Pulmonary Disease 79.3
Diagnosed Diabetes 91.9
Life Expectancy at Birth 87.6
Cognitively Disabled 15.9
Physically Disabled 9.6
Heart Attack ER Admissions 65.5
Mental Health Not Good 80.9
Chronic Kidney Disease 79.8
Obesity 76.5
Pedestrian Injuries 84.5
Physical Health Not Good 85.2
Stroke 70.4
Health Risk Behaviors —
Binge Drinking 24.0
Current Smoker 84.4
No Leisure Time for Physical Activity 94.8
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 98.7
Elderly 18.9
412 N Oakhurst Drive Detailed Report, 8/1/2024
81 / 82
English Speaking 44.9
Foreign-born 59.3
Outdoor Workers 98.2
Climate Change Adaptive Capacity —
Impervious Surface Cover 6.3
Traffic Density 62.4
Traffic Access 87.4
Other Indices —
Hardship 7.1
Other Decision Support —
2016 Voting 23.3
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 44.0 Healthy Places Index Score for Project Location (b) 55.0 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
412 N Oakhurst Drive Detailed Report, 8/1/2024
82 / 82
8. User Changes to Default Data
Screen Justification
Land Use Total site acreage 0.35-acre
Construction: Construction Phases Per construction questionnaire Construction: Off-Road Equipment Per construction questionnaire Operations: Hearths SCAQMD Rule 445
Construction: Architectural Coatings SCAQMD Rule 1113
P.O. Box 542
Long Beach, CA
562.500.9451
1 Ostashay & Associates
CONSULTING
Letter Report
To: Judy Gutierrez, Senior Planner Date: 02/21/2024
Cindy Gordon, AICP, Principal Planner
City of Beverly Hills
From: Jan Ostashay, Principal OAC
Re: Historical Resources Assessment-CEQA Compliance: 412 North Oakhurst Drive, Beverly Hills Overview
This letter report presents the findings of a historical resources assessment prepared by Ostashay & Associates Consultants (OAC) for the existing multi-family apartment building located at 412 North Oakhurst Drive (subject property) within both the City of Beverly Hills and City of Los Angeles. The purpose of this historic resources assessment is to identify and evaluate any historical resources that may be affected by the implementation of a new multi-family residential development project proposed for the subject property.
This assessment was prepared to comply with the California Environmental Quality (CEQA); to assess the existing building on the parcel for eligibility as a historical resource, as defined by CEQA1; and to analyze the potential impacts of the proposed project on identified historical resources. Therefore, this letter report documents and evaluates the state and local significance and eligibility of the subject property. The report includes a discussion of the survey methods used, a brief historic context of the subject property and surrounding area, the application of relevant significance criteria for the identification and historical evaluation of the subject property, and an impacts analysis for the proposed project. This determination will be used by city staff to help determine the appropriate level of environmental review for consideration of the requested demolition of the existing building.
Based on an intensive-level survey of the subject property and immediate area, the apartment building at 412 North Oakhurst Drive, which is over 45 years of age, does not possess any historical importance or architectural merit to consider it a historical resource pursuant to the CEQA Guidelines. It does not distinctively reflect or exemplify the broad cultural, political, economic, or social history of the nation, state, City of Los Angeles or City of Beverly Hills. For the purposes of CEQA compliance, the proposed project would not result in any direct or indirect impacts to historical resources.
The historic resources assessment was completed by Jan Ostashay, principal with OAC. Ms. Ostashay has over 30 years of historic preservation experience and satisfies the U.S. Secretary of the Interior’s Professional Qualification Standards in history and architectural history (36 CFR, Part 61). 1 CEQA Guidelines, section 15064.5 (a).
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 2 Methodology
In order to identify and assess the project site for historical significance, a multi-step methodology was utilized. A record search to identify previously documented historic resources was conducted. This search included a review of the National Register of Historic Places (National Register) and its annual updates, determinations of eligibility for National Register listings, the California Register of Historical Resources (California Register), and the California Historical Resources Inventory System (CHRIS) maintained by the State Office of Historic Preservation (OHP). Previously completed historic resources surveys and inventories prepared for the City of Beverly Hills were also consulted.
OAC also performed research and reviewed building permits, Sanborn fire insurance maps, historic aerial photographs, prior survey assessments of the area, and other primary and secondary sources relevant to the subject property and immediate neighborhood. More specifically, to complete assessment, Ms. Ostashay completed the following tasks:
• Reviewed the City’s Historic Preservation Ordinance (codified as Beverly Hills [BHMC] Title 10, Chapter 3, Article 32) and applicable previously completed city-sponsored historic resources surveys, survey updates, evaluations, and historic context statements. • Conducted a field inspection of the study area (project site) and photographed the site and its features.
• Conducted additional archival research on the history of the subject property, including its original owner, builder, and designer; any significant physical alterations made to the site and exterior of the building; other prior owners and occupants; and the residential development history of the immediate area. Background research performed also included a review of various online resources locally and globally from a multitude of diverse research, archival, library, museum, and academic repositories and collections, including the Avery Index to Architectural Periodicals; Gale General OneFile online databases; Digital Herrick Library; Calisphere (University of California system); Digital Public Library of America; Google BooksGoogle Research; Proquest (online research applications and databases); Getty Digital Catalog Library; WorldCat–OCLC (online computer library center); HathiTrust Digital Library; Ancestry.com; FamilySearch.com; Architectural Digest Archive; Architectural Record Archives; Huntington Digital Library; Newspapers.com; Pacific Coast Architecture Database (PCAD); University of California Santa Barbara Architecture and Design Collection, Design & Museum archives; Water and Power Associates photographic collection; Issuu – Digital Publishing Platform for Magazines, Catalogs, and other publications; Library of Congress; among others. • Reviewed relevant National Park Service (NPS) guidance documents on evaluating the significance of potential historic properties. Also searched the National Register online database, the City’s online sources, and OAC’s in-house library for any properties with similar contexts or evaluated under similar criteria as that of the subject property. • Reviewed the potential historical significance of the property relevant to the California Register criteria, CEQA, and the City of Beverly Hills (landmark/historic district) significance criteria. • Utilized the results of the research conducted to perform the assessment presented herein this letter report.
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 3 Regulatory Framework
Historic resources fall within the jurisdiction of several levels of government. Federal laws provide the framework for the identification, and in certain instances, protection of historic resources. In addition, states and local jurisdictions play active roles in the identification, documentation, and protection of such resources within their communities.
Numerous laws and regulations require federal, state, and local agencies to consider the effects of a proposed project on historic resources. These laws and regulations stipulate a process for compliance, define the responsibilities of the various agencies proposing or overseeing the action, and prescribe the relationship among other involved agencies (e.g., State Historic Preservation Office and the Advisory Council on Historic Preservation). The National Historic Preservation Act (NHPA) of 1966, as amended; the California Environmental Quality Act (CEQA); the California Register; Public Resources Code (PRC) 5024; and the City of Beverly Hills Municipal Code are the primary laws, policies, and programs governing and affecting preservation of historic resources of national, state, and local significance.
In order for a property to qualify for listing on the California Register and/or as a local landmark (City of Beverly Hills landmark or historic district) it must satisfy the relevant criteria of significance and retain sufficient historical integrity to convey its significance. A property must retain sufficient integrity to continue to evoke the sense of place and time with which it is historically associated.
California Environmental Quality Act
CEQA requires that environmental protection be given significant consideration in the decision-making process of a proposed project. Historic resources are included under environmental protection. Thus, any project or action which may cause a substantial adverse change in the significance of an historic resource is a project that also has a significant effect on the environment. CEQA includes in its definition of historic resources a resource listed in or determined eligible for listing in the California Register.
Properties included on the National Register (and those formally determined to be eligible for such listing) are also automatically included on the California Register. In addition, properties designated by local municipalities can be considered historical resources under CEQA.
As stated, CEQA defines a historical resource as a resource listed in, or determined eligible for listing in, the California Register. All properties on the California Register are to be considered under CEQA.
However, because a property does not appear on the California Register does not mean it is not significant and, therefore, exempt from CEQA consideration. All resources determined eligible for the California Register are also to be considered under CEQA.
The courts have interpreted CEQA as to create three categories of “historical resources” (PRC 21084.1):
• Mandatory historical resources: Resources “listed in, or determined to be eligible for listing in the California Register of Historical Resources.”
• Presumptive historical resources: Resources “included in a local register of historical resources, as defined in subdivision (k) of Section 5020.1 (of the Public Resources Code), or deemed significant pursuant to criteria set forth in subdivision (g) of Section 5024.1, unless the preponderance of the evidence demonstrates that the resource is not historically or culturally significant.
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 4 • Discretionary historical resources: Resources “listed in, or determined to be eligible for listing in, the California Register of Historical Resources.” “The fact that a resource is not listed in, or determined to be eligible for listing in the California Register, not included in a local register of historical resources (pursuant to section 5020.1(k) of the Public Resources Code), or identified in a historical resources survey (meeting the criteria in section 5024.1(g) of the Public Resources Code) does not preclude a lead agency from determining that the resource may be an historical resource” for the purpose of CEQA, as defined in Public Resources Code sections 5020.10 or 5024.1.”
To simplify the first three definitions provided in the CEQA statute, an historical resource is a resource that is:
• Listed in the California Register of Historical Resources; • Determined eligible for the California Register by the State Historical Resources Commission; or
• Included in a local register of historical resources.
Section 16054.5 of the CEQA Guidelines supplements the statute by providing two additional definitions of historical resources, which may be simplified in the following manner. An historical resource is a resource that is:
• Identified as significant in an historical resource survey meeting the requirements of Public Resource Code 5024.1 (g);
• Determined by a Lead Agency to be historically significant or significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California. Generally, this category includes resources that meet the criteria for listing in the California Register.
The fact that a resource is not listed in, or determined eligible for listing in, the California Register, not included in a local register of historical resources, or not deemed significant pursuant to criteria set forth in subdivision (g) of Section 5024.1, does not preclude a lead agency from determining that the resource may be an “historical resource” for purposes of CEQA.
Properties formally determined eligible for listing in the National Register are automatically listed in the California Register. Properties designated by local municipalities can also be considered historical resources. A review of properties that are potentially affected by a project for historic eligibility is also required under CEQA.
National Register of Historic Places
First authorized by the Historic Sites Act of 1935, the National Register of Historic Places (National Register) was established by the NHPA, as “an authoritative guide to be used by Federal, State, and local governments, private groups and citizens to identify the Nation’s cultural resources and to indicate HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 5 what properties should be considered for protection from destruction or impairment.”2 The National Register recognizes properties that are significant at the national, state and local levels.
To be eligible for listing in the National Register, a resource must be significant in American history, architecture, archaeology, engineering, or culture. Districts, sites, buildings, structures, and objects of potential significance must also possess integrity of location, design, setting, materials, workmanship, feeling, and association. In addition, unless the property possesses exceptional significance, it must be at least fifty (50) years old to be eligible for listing in the National Register. For National Register consideration four criteria have been established to determine the historical significance of a resource. 3 A property of potential significance must meet one or more of the following four established criteria:
Criterion A: It is associated with events that have made a significant contribution to the broad patterns of our history;
Criterion B: It is associated with the lives of persons significant in our past; Criterion C: It embodies the distinctive characteristics of a type, period, or method of construction or that represent the work of a master, or that possess high artistic values, or that represent a significant and distinguishable entity whose components may lack individual distinction;
Criterion D: It yields, or may be likely to yield, information important in prehistory or history.
In addition to meeting at least one of the above designation criteria, resources must also retain integrity. The National Park Service recognizes seven aspects or qualities that, considered together, define historic integrity. To retain integrity, a property must possess several, if not all, of these seven qualities, defined as follows:
Location: The place where the historic property was constructed or the place where the historic event occurred.
Design: The combination of elements that create the form, plan, space, structure, and style of a property.
Setting: The physical environment of a historic property.
Materials: The physical elements that were combined or deposited during a particular period of time and in a particular pattern or configuration to form a historic property.
Workmanship: The physical evidence of the crafts of a particular culture or people during any given period in history or prehistory.
Feeling: A property’s expression of the aesthetic or historic sense of a particular period of time.
Association: The direct link between an important historic event or person and a historic property.
The aspects of integrity that are essential vary depending on the significance of the property. However, in assessing a property’s integrity, the National Register(and California Register) criteria does recognize 2 Code of Federal Regulations (CFR), 36 Section 60.2.
3 Guidelines for Completing National Register Forms, National Register Bulletin 16, U.S. Department of Interior, National Park Service, September 30, 1986 (“National Register Bulletin 16”). This bulletin contains technical information on comprehensive planning, survey of cultural resources and registration in the National Register of Historic Places.
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 6 that properties change over time, therefore, it is not necessary for a property to retain all its historic physical features or characteristics. The property must retain, however, the essential physical features that enable it to convey its historic identity. Under the City’s Municipal Code (BHMC Title 10, Chapter 3, Article 32, Section 3202) integrity is defined as “the ability of a property to convey its historical significance through its location, design, setting, materials, workmanship, feeling, relevant association, and character-defining features.”
California Register of Historical Resources
The California Register of Historical Resources was established in 1992 and codified by Public Resources Code Section 5024.1 and Title 14, Section 4852. The California Register is an authoritative guide in California used by State and local agencies, private groups, and citizens to identify the State's historic resources and to indicate what properties are to be protected, to the extent prudent and feasible, from substantial adverse change.4
The California Register was designed on the model of the National Register.5 Though the two programs are extremely similar, they are not one and the same. The California Register criteria have been modified for state use in order to include a range of historical resources that better reflect the history of California (PRC 5024.1(b)). Unlike the National Register, however, the California Register does not have a defined age threshold for eligibility; rather, a resource may be eligible for the California Register if it can be demonstrated that sufficient time has passed to understand its historical or architectural significance. Furthermore, resources may still be eligible for listing in the California Register even if they do not retain sufficient integrity for National Register eligibility. Generally, OHP recommends resources over 45 years of age be recorded and evaluated for historical resources eligibility. A historical resource may be significant at the local, state, or national level.
A property is eligible for listing in the California Register if it meets one or more of the following criteria:
Criterion 1. Associated with events that have made a significant contribution to the broad patterns of local or regional history or the cultural heritage of California or the United States.
Criterion 2. Associated with the lives of persons important to local, California or national history.
Criterion 3. Embodies the distinctive characteristics of a type, period, region or method of construction or represents the work of a master or possesses high artistic values.
Criterion 4. Has yielded, or has the potential to yield, information important to the prehistory or history of the local area, California or the nation.
The California Register consists of resources that are listed automatically and those that have been nominated through an application and public hearing process. The California Register includes the following:
• California properties formally determined eligible for listing in the National Register, identified with a California Historical Resources Status Code (“Status Code”) 2 in the California Historic Resources Inventory (“HRI”); or listed in the National Register (Status Code 1 in the HRI; 4 California PRC, Section 5023.1(a).
5 State of California – The Resources Agency, Office of Historic Preservation, Department of Parks and Recreation, California Office of Historic Preservation Technical Assistance Series #6, “California Register and National Register:
A Comparison (for purposes of determining eligibility for the California Register),” May 2001.
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 7 • State Historical Landmarks No. 770 and all consecutively numbered state historical landmarks following No. 770. For state historical landmarks preceding No. 770, the Office of Historic Preservation (OHP) shall review their eligibility for the California Register in accordance with procedures to be adopted by the State Historical Resources Commission (“Commission”); and • Points of historical interest which have been reviewed by the OHP and recommended for listing by the Commission for inclusion in the California Register in accordance with criteria adopted by the Commission.6
City of Beverly Hills Designation (Significance) Criteria The Beverly Hills Historic Preservation Ordinance (BHMC Title 10, Chapter 3, Article 32) includes criteria and the processfor designating local landmarks and historic districts. The Cultural Heritage Commission inspects, investigates, and recommends the designation of landmarks and historic districts to the City Council for their consideration.
Landmark Designation Criteria
In order to be eligible for designation as a historic landmark in the City of Beverly Hills, a property must satisfy all of the following requirements under Part A, as follows:
Part A:
Criterion A.1 It is at least forty-five (45) years of age, or is a property of extraordinary significance; Criterion A.2 It possesses high artistic or aesthetic value, and embodies the distinctive characteristics of an architectural style or architectural type or architectural period; Criterion A.3 It retains substantial integrity from its period of significance; and Criterion A.4 It has continued historic value to the community such that its designation as a landmark is reasonable and necessary to promote and further the purposes of this article.
In addition to the requirements set forth above, a landmark must satisfy at least one of the following requirements under Part B, as follows:
Part B:
Criterion B.1 It is listed on the National Register of Historic Places; Criterion B.2 It is an exceptional work by a Master Architect; Criterion B.3 It is an exceptional work that was owned and occupied by a person of great importance and was directly connected to a momentous event in the person’s endeavors or the history of the nation. For purposes of this paragraph, personal events such as birth, death, marriage, social interaction, and the like shall not be deemed to be momentous.
Criterion B.4 It is an exceptional property that was owned and occupied by a person of great local prominence;
Criterion B.5 It is an iconic property; or
Criterion B.6 The landmark designation procedure is initiated, or expressly agreed to, by the owner(s) of the property.
6 California PRC, Section 5023.1(d).
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 8 Historic District Designation Criteria
Criterion A. The district is comprised of contributing properties that are contiguous or grouped in close proximity, and that are located in a definable area and are unified by theme, plan, or physical development;
Criterion B. The district reflects significant development patterns, including those associated with different eras of urban growth, particular transportation modes, or distinctive examples of community planning;
Criterion C. No part of the district, and no property in the district, is located in an area of the city zoned for one-family development, including, but not limited to, any area zoned R-1; Criterion D. At least seventy percent (70%) of the properties in the district are contributing properties;
Criterion E. All of the contributing properties predominantly embody the distinctive elements of a single architectural style or architectural type or architectural period; Criterion F. Each contributing property retains substantial integrity from the district's period of significance; and
Criterion G. The district as a whole has continued historic value to the community such that its designation as a district is reasonable and necessary to promote and further the goals of this article.
Historical Assessment
The following section summarizes the results of the site-specific background research and fieldwork as they pertain to the built environment resources that may qualify as historical resources. The field work and records search review resulted in the identification of one historic-age building within the project site. The multi-family apartment building located at 412 North Oakhurst Drive was built in 1974 and is therefore over 45 years of age for CEQA purposes.
Property Background
The apartment structure under review is located along the eastside of North Oakhurst Drive between Beverly Boulevard to the north and Alden Drive to the south. According to the Los Angeles County Assessor’s records, the subject property occupies lots 1 and 2 of Tract No. 31632 (within original Tract No. 5647). The lot 1 measures roughly 102 feet wide and 42.5 feet deep (long) and fronts Oakhurst Drive to the west. The lot 2, set behind lot 1 to the east, measures approximately 102 feet wide and 107 feet deep (long) with an alley that runs north and south at the rear (east) of the parcel. The multistory building is situated at the eastern edge of Beverly Hills and is under the jurisdiction of both the City of Los Angeles and the City of Beverly Hills.
The neighborhood immediately surrounding the subject property consists of multi-family apartment buildings and condominiumsthat range from two-storiesto four-storiesin height and have a date range from 1935 to 1999. The majority of the buildings on this portion of the 400 block of North Oakhurst Drive are three-story condominiums with one-story subterranean garages that were built in the 1960s and 1970s.
The subject property is not currently listed in the National Register or California Register and has not been designated a local City of Beverly Hills landmark or City of Los Angeles Historic-Cultural HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 9 Monument. In addition, the property has not been previously evaluated for historical significance either individually or as a contributor to a potential historic district. The 1985-1986 Beverly Hills Historic Resources Survey did not record it or identify it as part of its survey efforts. The 2004 Historic Resources Survey Update did not identify it as that particular survey work assessed only multi-family residences south of Wilshire Boulevard and re-evaluated properties previously identified from the 1985-1986 survey. The 2006-2007 survey re-evaluated previously identified commercial properties along Wilshire Boulevard and within the City’s Commercial Triangle area as well as other commercial properties constructed between 1935 and 1965. Hence, the subject property was not identified or recorded as part of that survey work. In addition, the City of Los Angeles SurveyLA program did not identify it or record it for potential historical significance.
Building Description
Constructed in 1974, the building, called the “Oakhurst Royale Apartments,” exhibits the typical features of the ubiquitous podium style Stucco Box multi-family typology, a popular building form of the late 1950s, 1960s, and early 1970s. The architecturalstyle of the 412 North Oakhurst Drive property is perhaps best characterized as “Vernacular” Contemporary, a low style of the period that takes some characteristics of the Late Modern idiom and popularizes and dilutes them in terms of design application and use of mass-produced materials. The smooth stucco exterior wall surfaces(east, north, south elevations), simple use of wood accent trim on the front (west) façade, aluminum frame flush set windows, slider balcony doors, integrated parking, flat roof with central light well (interior courtyard area), and floor-to-ceiling glazing typifies this style.
The medium size, multi-family residential structure consists of 15 units arranged around a small, interior landscaped courtyard area with cutaway along its east (side) elevation. With a “C” shaped plan, the three-story building is slightly raised from grade and sits above a subterranean garage. The building fronts west onto Oakhurst Drive and its front (primary) façade features a centrally placed entry driveway into the garage and an offset pedestrian entry approached from the public sidewalk via a paved walkway, low-rise steps, and landing with integrated brick planters. Access into the building is through aluminum-framed glazed double doors that lead to the lobby and elevator.
The building’s only readily visible detailing occurs on the asymmetrical composed front (west) façade with a series of solids to voids that include extended balconies constructed ofhorizontally stacked wood planks, large sliding glass doors that open onto the balconies, vertical wood (painted) plank veneer siding with corner boards, floor-to-ceiling large pane windows, and varied height parapets. The secondary (north, south, and east) elevations are more non-descript in design and function as they include stucco sheathing, some varied aluminum-framed fenestration, limited recessed balcony space, and the modest application of wood accent trim. The multi-level communal courtyard features integrated raised brick planters and steps, stone pavers, lush plantings of small trees and shrubs, and a brick paved floor deck. The open courtyard affords ample natural light to the units and provides a garden setting for the apartment units (some first-floor units have direct access via sliding glass patio doors, some upper units have extended balconies that open out over portions of the courtyard space).
Construction History
The area where the subject property is located was initially subdividedinto a few hundred lotsof varying size in October 1922 by Burton Green, president of the Rodeo Land & Water Company as Tract No. 5647. Prior to the construction of the subject property in 1974 the site was initially developed with two multi-family improvements addressed as 412 North Oakhurst Drive and 414 North Oakhurst Drive that HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 10 dated to the 1930s. Each structure sat on its own lot that measured roughly 51 feet by 150 feet and were referred to as lots 7 and 8.
The two parcels were purchased in early 1973 by the Lincoln Property Company, a Dallas based developer of garden type apartments and condominiums across the nation with an office in Los Angeles (it later moved to Santa Monica). In May 1973, Lincoln Property Co. was issued a permit from the City of Los Angelesfor the construction of a new three-story condominium with integrated garage on lots 7 and 8. Lincoln Property Co. had just built three similar condominium buildings along the 400 blocks of North Oakhurst Drive (403-406-429 North Oakhurst Drive) using essentially the identical design plan and configuration as that proposed for the 412 North Oakhurst Drive site. Demolition permits were also issued to Lincoln Property Co. for the removal of the two existing apartment structures at 412 and 414 North Oakhurst Drive in October 1973. However, ownership of the two lots changed to David Konis of Los Angelesin December of that year. Konis continued the redevelopment of the site with the same architectural plans developed by the Lincoln Property Co.
In January 1974, Konis had the two existing apartment buildings at 412 and 414 North Oakhurst Drive demolished and then began construction of the new three-story, multi-family building.7 The 15-unit
complex was designed with three one-bedroom units with den and 1.5 bathrooms; three two-bedroom with den units and two bathrooms; and nine two-bedroom, two bath units. All units featured fireplaces, wet bars, walk-in closets, washer and dryer, air conditioning, and parking.
A subdivision map of the two lots was recorded with the Los Angeles County Recorder Office by David Konis in August 1974, thereby combining the two parcels to create Tract No. 31632 lot 1 for that portion in the City of Beverly Hills and lot 2 for the that portion in the City of Los Angeles of. 8 A certificate of
occupancy was ultimately issued for the new multi-story building with 15 apartment units and subterranean parking at 412 North Oakhurst Drive property on November 21, 1974. Final inspection of the building was signed off by the City of Beverly Hills in December 1974. Though initially designed and planned as a condominium the building was actually maintained and operated as an apartment complex upon its completion.
Over the years the building has undergone limited exterior changes including repair work to the balconies due to termite damage and some roof repair and replacement. Work on the balconies involved removing the original wide plank wood handrails and replacing them with metal guardrails with simple scroll work detailing. Horizontal guardrails of the same material and style were also added to the base of the large floor-to-ceiling windows along all four elevations and those facing into the communal courtyard. An additional noted change was the painting of the vertical plank wood siding on the front façade (it was originally stained). Despite these changes, the exterior of the building overall is in good condition and retains much of its integrity.
Ownership/Occupancy History
Upon issuance of the certificate of occupancy from the City of Los Angeles David Konis began advertising the apartment units for rentin the local newspapersin early November 1974. Konis and his wife Elvira remained the sole owners of the Oakhurst Royale Apartments over several decades. With 7 Permits for the associated work were issued from both the City of Los Angeles and City of Beverly Hills. 8 The new subdivision and associated tract map were created for condominium purposes.
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 11 the passing of David Konis in 2007, Elvira retained ownership until December 2020 when the property was sold to Oakhurst Skyline, LLC, who is the current owner9
David Konis was born in Salonica, Greece on September 9, 1917. He entered to the United States through Ellis Island, New York City with his then wife Bella Nee Amir (1919-1981) and two children Maurice (1946- ) and Joseph (1946-2011) in 1951. In June 1957, he and his family petitioned for U.S. citizenship (naturalization), which was granted on February 21, 1958. David Konis, who changed his surname from Kohen at the time of naturalization, owned and operated the Hamilton Supply Company, Inc., a large wholesale plumbing supply company with offices and warehouses throughout the southland. Eventually, his two sons took over the business upon David’s retirement. David and Bella had another son, Lawrence Jack in January 1959, though later divorced in 1968. David went on to marry Elvira Robles (1944- ) in 1970, just a few years before the 412 North Oakhurst Drive property was constructed. David Konis, a Jewish survivor of the Holocaust, passed away on June 26, 2007, just shy of his 90th birthday.
The occupancy history of 412 North Oakhurst Drive is typical of a multi-family residential building, which has had a number of residents over the years. Most of the prior occupants were white collar employees and retirees. Research through newspapers, city directories, and various repository databases did not yield any information on any significant individuals associated with the property. As a building occupied by numerous residents throughout its existence, with few identified tenants remaining occupants for more than a three to five year period, the building is not strongly associated with a particular individual.
Designer-Architect
According to the original 1973 building permit, the architect of the subject property was Ehud Feldman.
Feldman was a Los Angeles architect whose office was located at 8322 Beverly Boulevard just east of La Cienega Boulevard. Born in Tel Aviv, Israel on February 11, 1939, Feldman arrived in the United States on April 10, 1968. Three years later he received his license to practice architecture in California in November 1971. By March 1974 he had petitioned for U.S. citizenship in Los Angeles, which was granted April 26, 1974.
The earliest references to Feldman practicing architecture in the Los Angeles area are in association with development projects by the Lincoln Property Company of Los Angeles. Between 1973 and 1974, Feldman designed a number of the company’s smaller multi-family residences in and around the west side of Los Angeles, as well as Santa Monica and Beverly Hills. His known design work in Beverly Hills includes 424 North Palm Drive (condominium, 1973), 429 North Oakhurst Drive (condominium, 1973), 406 North Oakhurst Drive (1973, condominium), 403 North Oakhurst Drive (1974, condominium), and the subject property (1974, apartment). These residential buildings were essentially identical in design and were based on a standardized plan for efficiency and cost effectiveness by the initial property developer. By the end of 1976, Ehud Feldman had incorporated as Ehud Feldman Associates, Inc. with his office located in Tarzana. Other projects associated with Feldman included the design of a Bank of America branch office in the City of Commerce in 1974 and a large single-family residential project in Agoura for Maier-Dinow Homes in 1977. Feldman continued to practice architecture in and around the 9 The grant deed lists Oakhurst Skyline, LLC (52.72% interest); 412 Oakhurst 1, LLC (12,49% interest); 412 Oakhurst 2, LLC (12.49% interest); and 412 Oakhurst 3, LLC (22.30% interest)-collectively referred to as Oakhurst Skyline, LLC.
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 12 Encino, Tarzana, Sherman Oaks, and Woodland Hills areas for several additional years. Ehud Feldman passed away on November 17, 2018, at the age of 79 years.
Ehud Feldman is not included in the City’s “List of Local Master Architects” nor was he ever recognized amongst his peers for his design practice or architectural portfolio. Hence, at this time no evidence was found to consider him a master within the architectural design field.
Historical Evaluation Findings
The property was evaluated for individual listing in the National Register, California Register, and for potential local designation as a City of Beverly Hills landmark. Because eligibility criteria for the California Register align in large degree with the eligibility criteria for the National Register, the following evaluation considers eligibility for federal and state levels under a single heading.
NATIONAL REGISTER/CALIFORNIA REGISTER
National Register Criterion A/California Register 1
The subject property does not appear to have made a significant contribution to events that have made a significant contribution to the broad patterns of California history, national history, or local regional history. Research did not identify the initial tract, Tract No. 5647 (or the newer Tract No. 31632) or North Oakhurst Drive as developments significant to Beverly Hills’ (or Los Angeles) post-World War II development. In addition, the period of the subject property’s construction (1974) does not seem to be strongly associated with the history of multi-family residential development in Beverly Hills.
Therefore, the subject property does not meet this criterion.
National Register Criterion B/California Register 2
The research through various primary and secondary sources did not identify any persons who made significant contributions to history that were strongly associated with the subject property. As mentioned, the building was occupied by numerous residents throughout its existence, with few identified tenants remaining as occupants for more than a three to five year period. Therefore, the building is not strongly associated with any one particular individual(s) and does not meet this criterion.
National Register Criterion C/California Register 3
The subject property does not embody the distinctive characteristics of a type, period, region, or method of construction, nor does it represent the work of an important creative individual or possess high artistic value. As an example of its type, era, and construction method, the subject property does not stand out as individually significant within the framework of vernacular contemporary architecture or late-twentieth century architectural design. The plan and design of the apartment building is based on a standardized design by the architect Ehud Feldman for property development Lincoln Property Company as a means of saving money and processing construction as quickly as possible. As such, the subject property is representative of vernacular regional construction, common to many communities in terms of its form, materiality, and does not stand out for exhibiting the distinctive characteristics of a particular style. Furthermore, the subject property was not designed or constructed by a notable master architect or builder of the City or southland. The 412 North Oakhurst Drive property, therefore, does not meet this criterion.
HISTORICAL RESOURCES ASSESSMENT‐ CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 13 National Register Criterion D/California Register 4
Areviewof available evidence and recordssearch does notsuggestthe subject property hasthe yielded or hasthe potential to yield information important in prehistory or history of Beverly Hills, Los Angeles, regionally, the state, or nationally. Assuch, the subject property does not meet this criterion.
CITY OF BEVERLY HILLS
To qualify as eligible as an historic landmark in Beverly Hills, a property must satisfy all of the requirements in Section A and at least one of the requirements in Section B. As evaluated below, the subject property did notsatisfy the necessary mandates asstipulated in the City’s Historic Preservation Ordinance (BHMC Title 10, Chapter 3, Article 32, Section 3212).
Criterion A.1 – Age
It is at least forty‐five (45) years of age or is a property of extraordinary significance.
The multi‐family residence under review was completed in 1974. It is, therefore, over 45 years of age.
Assuch, the subject property meetsthe requirement for Criterion A.1.
Criterion A.2 ‐ Style
It possesses high artistic or aesthetic value and embodies the distinctive characteristics of an architecturalstyle or architectural type or architecture period.
As mentioned above, the subject property is not representative of any particular architectural style, type, or period of architecture. The podium style apartment building with subterranean parking, many of which are still extant in the immediate area, was a common building type and form that became ubiquitous in areas of Beverly Hills, Los Angeles, and throughout the region. In addition, the property does not embody any distinct artistic or aesthetic value. The 412 North Oakhurst Drive property does notsatisfy Criterion A.2.
Criterion A.3 ‐ Integrity
It retainssubstantial integrity from its period ofsignificance.
Minimal alterations have occurred to the exterior of the building, which allows it to retain much of its integrity from its period ofsignificance (1974). Therefore, the subject property satisfiesthis criterion.
Criterion A.4 – Historic Value
It has continued historic value to the community such that its designation as a landmark is reasonable and necessary to promote and further the purposes of this article.
The subject property does not appear to have a strong historic value. It is not known to have a particularly strong link to any historic or notable individuals orsignificant eventsin Beverly Hills history.
It also does not appear to have been an important contributor to the history of multi‐family residential development in Beverly Hills. Therefore, the subject property does not meet this criterion.
Criterion B.1 – National Register
It islisted on the National Register of Historic Places.
The subject property is not listed on the National Register. Therefore, it does not meet Criterion B.1.
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 14 Criterion B.2 – Exceptional Work – Master Architect
It is an exceptional work by a Master Architect.
The subject property was designed by architect Ehud Feldman. Feldman is not included in the City’s “List of Local Master Architects” nor was he ever recognized amongst his peers for his design practice or architectural portfolio. Hence, at this time no evidence was found to consider him a master within the architectural design field. As such, the subject property does not satisfy this criterion.
Criterion B.3 – Person of Great Importance
It is an exceptional work that was owned or occupied by a person of great importance, and was directly connected to a momentous event in the person’s endeavors or the history of the nation. Personal events such as birth, death, marriage, social interaction, and the like shall not be deemed to be momentous.
Upon conducting and reviewing background information on the prior owners and occupants of the subject property is not known to have been owned or occupied by any person of great importance, as defined in the City’s Ordinance. Furthermore, the property is not recognized as an “exceptional work,” as defined in the City’s Ordinance. Consequently, the property does not meet Criterion B.3.
Criterion B.4 – Person of Great Local Prominence
It is an exceptional property that was owned and occupied by a person of great local prominence.
The subject property is not known to be owned or occupied by a person of great local prominence.
Research conducted on the subject property owners as delineated through grant deeds does not show any significant link between the initial property owners and the City. Therefore, the 412 North Oakhurst Drive apartment building does not meet this criterion.
Criterion B.5 – Iconic
It is an iconic property.
The subject property is not recognized as an iconic property, as defined in the City’s Ordinance. Hence, the subject property does not meet this criterion.
Criterion B.6 – Voluntary Designation
The landmark designation procedure is initiated, or expressly agreed to, by the owner(s) of the property.
The owner of the subject property is not seeking landmark designation. The subject property, therefore, does not meet this criterion.
Conclusion
Based upon the criteria and evaluation considered above, the apartment building located 412 North Oakhurst Drive appears ineligible for listing in the National Register, California Register, and as a City of Beverly Hills landmark. Furthermore, because of the varied development patterns, architectural styles, and infill with new construction no potential historic district was identified for potential landmarking in the immediate area. This portion of North Oakhurst Drive lacks integrity and any cohesiveness, concentration, or continuity of resources united by plan, architecture, period, or physical development.
As such, the subject property does not qualify as a historical resource and its demolition would not result in a significant adverse impact as defined by Section 15064.5 of the CEQA Guidelines. Based on the findings of this investigation, OAC concludes a finding of no impact to historical sources under CEQA.
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 15 Sources
“2 Swimming Pools Featured.” Real Estate Section, Los Angeles Times, November 25, 1973, B6. “Agoura Project Breaks Ground.” Los Angeles Times, October 16, 1977.
American Council of Engineering Companies of California. 2023 California Environmental Quality Act & CEQA Guidelines. Sacramento: American Council of Engineering Companies of California, 2023.
Ancestry.com. United States Census records (database on-line): 1890, 1900, 1910, 1920, 1930, 1940, 1950; World War I draft registration records; World War II draft registration records; California Death Index Records; voter registration records, city directory files, other relevant misc. files, etc. Provo, Utah. Available through ancestry.com. Accessed February 1-5, 2024.
Anderson, Robert S. Beverly Hills: The First 100 Years. New York: Rizzoli, 2014.
AD Archives. Available through https://archive.architecturaldigest.com. Accessed February 1, 2024.
Avery Index to Architectural Periodicals. Available through the Los Angeles Public Library. Accessed January 31, 2024.
Basten, Fred E. Beverly Hills: Portrait of a Fabled City. Los Angeles: Douglas-West Publishers, 1975.
Benedict, Pierce E., ed. History of Beverly Hills. Beverly Hills: A.H. Cawston, 1934.
Beverly Hills City Directories (various years). U.S. City Directories, 1822-1995. Available through ancestry.com. Accessed February 1-2, 2024.
“Beverly Hills Projects Honored for Architecture.” Los Angeles Times, April 20, 1975, pt. IX, 16.
California Historical Society Collection at the University of Southern California. USC Digital Library, Los Angeles. Accessed February 1-2, 2024.
Calisphere, University of California. Historical photograph collection. Available at https://calisphere.org. Accessed January 31, 2024.
City of Beverly Hills. Building Permit Records. Available online at https://cs.beverlyhills.org/cs/. Assessed January 31, 2024.
City of Los Angeles. Building Permit Records. Available online at https://cs.beverlyhills.org/cs/.
Assessed January 31, 2024.
City of Los Angeles. California Environmental Quality Act, Notice of Exemption-412 North Oakhurst Drive. City of Los Angeles-Department of City Planning, 2023.
City of Los Angeles. Letter of Compliance-Ministerial On-Menu Density Bonus, 412 North Oakhurst Drive, Beverly Hills. City of Los Angeles-Department of City Planning, November 22, 2023. “Classified Advertisement, Apartment for Rent – Oakhurst Royale Apts.” Los Angeles Times, November 3, 1974, 49.
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 16 “Classified Advertisement, Apartment for Rent – Oakhurst Royale Apartments.” Los Angeles Times, December 8, 1974, 35.
“Classified Advertisement, Apartment for Rent – Oakhurst Royale Apts.” Los Angeles Times, January 5, 1975, 49.
“Classified Advertisement, Apartment for Rent – Oakhurst Royale Apts.” Los Angeles Times, October 4, 1980, 16.
Davis, Genevieve. Beverly Hills: An Illustrated History. Northridge, California: Windsor Publications, Inc., 1988.
Desser, Lou. “4 Beverly Hills Projects Bow.” Real Estate Section, Los Angeles Times, February 17, 1974, pt. X.
“Display Ad, Beverly Hills Condominiums.” Los Angeles Times, April 14, 1974, pt. X, 14. “Display Ad, Beverly Hills Condominiums.” Westchester-Ladera Observer, June 26, 1974, 5. “Display Ad, Lincoln Property Company, Apartments in a Garden.” Los Angeles Times, January 2, 1972, pt. X.
“Display Ad, No Money Down.” The Southwest Wave, March 17, 1960, 9. “Lincoln Property Co. Schedules Move.” Los Angeles Times, February 24, 1974, pt. X, 3.
Gebhard, David and Robert Winter. Architecture in Los Angeles. Salt Lake City, Utah: Peregrine Smith Books, 1985.
Gebhard, David and Robert Winter. An Architectural Guidebook to Los Angeles. Salt Lake City, Utah:
Gibbs Smith Publishers, 2003.
Getty Research Institute. Architecture & Design Collections (online). Available at https:// getty.libguides.com/architecture_design/welcome. Accessed February 5, 2024.
Google Books. Available at https://books.google.com. Searched relevant research topics, contexts, themes of subject property, prior owners and occupants, architect, etc. Accessed February 5, 2024.
Gross, Michael. Unreal Estate. New York: Broadway Books, 2011.
Hise, Greg. Magnetic Los Angeles. Baltimore, Maryland: The John Hopkins University Press, 1997.
Historic Aerial Images, 1947-2005. Accessed at http://historicalaerials.com., February 2, 2024.
Historic Aerial Photographs. University of California, Santa Barbara, Special Collections, UCSB Library, Frame Finder. Accessed February 2, 2024.
Johnson Heumann Research Associates. Beverly Hills Historic Resources Survey 1985-1986 Final Report.
Prepared for the City of Beverly Hills, 1986.
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 17 Jones & Stokes, ICF. “City of Beverly Hills Historic Resources Survey Report, Survey Area 5: Commercial Properties.” Prepared for the City of Beverly Hills, June 2006, rev. April 2007.
Los Angeles City Directories (various years). U.S. City Directories, 1822-1995. Available through ancestry.com. Accessed February 1-2, 2024.
Los Angeles County Public Works Records Information. Available at https://www.dpw.lacounty.gov/ smpm/landrecords/TractMaps.aspx. Accessed January 31, 2024.
Los Angeles County Recorder’s Office. “Grant Deed Records, 412 North Oakhurst Drive, Beverly Hills.” Accessed January 31, 2024.
Los Angeles County Tax Assessor Information. “412 North Oakhurst Drive, Beverly Hills: Index Map, Parcel Map, parcel information.” Available at https://maps.assessor.lacounty.gov/m/.
Accessed January 31, 2024.
Los Angeles Public Library. On-line historical and image database archives and files. Accessed February 2-5, 2024.
McAlester, Virginia. A Field Guide to American Houses. New York: Alfred A. Knopf, 2018.
Motley, Jack. “Developer Features Gardens at Residential Development.” Los Angeles Times, June 16, 1974, pt. VII, 1,10.
PCR Services Corporation. Historic Resources Survey Report. Prepared for the City of Beverly Hills, June 2004.
ProQuest Historical Newspapers: Los Angeles Times(1881-1988). Accessed February 1-6, 2024.
Regan, Michael. Stars, Moguls, Magnates: The Mansions of Beverly Hills, Bel Air, Holmby Hills and Vicinity. Los Angeles: Regan Publishing Company, 2012.
Sanborn Fire Insurance Company. Sanborn Fire Insurance Maps, Beverly Hills: 1922, 1926, 1927, 1950, 1951, 1969.
State of California – Department of Consumer Affairs. DCA License Search database. Available at https://search.dca.ca.gov. Accessed February 5-6, 2024.
State of California – The Resources Agency, Office of Historic Preservation, Department of Parks and Recreation.
California Office of Historic Preservation Technical Assistance Series #6, “California Register and National Register: A Comparison (for purposes of determining eligibility for the California Register),” May 2001.
THE MLS.COM. 412 North Oakhurst Drive, Beverly Hills listing photographs. Accessed January 31, 2024.
Turpin, Dick. “Building Giant’s Keys to Success.” Los Angeles Times, August 4, 1974, pt. VII, 2.
United States Department of the Interior. National Register Bulletin 15. “How to Apply the National Register Criteria for Evaluation.” Washington, D.C.: National Park Service, Interagency Resources Division, 1997.
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 18 United States Department of the Interior. National Register Bulletin 16, “Guidelines for Completing National Register Forms.” Washington, D.C.: National Park Service, Interagency Resources Division, 1986.
United States Department of the Interior. National Register Bulletin 24, “Guidelines for Local Surveys:
A Basis for Preservation Planning.” Washington, D.C.: National Park Service, Interagency Resources Division, 1985.
United States Department of the Interior. Preservation Brief 17. “Architectural Character – Identifying the Visual Aspects of Historic Buildings as an Aid to Preserving Their Character.” Washington, D.C.: National Park Service, Interagency Resources Division, 1982 rev.
Wanamaker, Marc. Images of America: Early Beverly Hills. Charleston, South Carolina: Arcadia Publishing, 2005.
Wanamaker, Marc. Images of America: Beverly Hills 1930-2005. Charleston, South Carolina: Arcadia Publishing, 2006.
Whiffen, Marcus. American Architecture Since 1780, A Guide to the Styles. Cambridge, Massachusetts:
MIT Press, 1969.
HISTORICAL RESOURCES ASSESSMENT- CEQA COMPLIANCE: 412 North Oakhurst Drive, Beverly Hills 19 EXHIBITS
Location Map
Site Map
Assessor Parcel Map
Original Permits(Beverly Hills and Los Angeles)
Photographs
PHOTOGRAPHS: 412 North Oakhurst Drive
Beverly Hills
Hawth:,rne
Elemen tary
School
,,,_ ,,,_ <:: (' ., ~?
~ "• .,,. ~ q_
~·
...
7,.
... '1,
...
t .. _
•.,. q_
Bi>Yerly
G,lfd~ns Park
q_
LOCATION MAP
412 N. Oakhurst Drive
-
Jli,
City of Beverly
,f HUlscm iall
ii'.
e ... .,r1yBlvd
r I
>--
----
-
Alden Dr
ul
3 !/
W3rd Sl
Burton Way
Dayton Way
CliftonW;,,y
-
Beverly 81\ld
BtverlyBlvd
- I
....... --------------- .::
.
. -..... .................
- !
• I
I
!
I
j
'"f o,
Mel•ose A.ve
Rangely ~"e
llouwood Ave
z
Alden Dr
W 3rd SL
!/
,.
3 I
i '
i
I
I
i
i
.
I
-.: - -
l,
t
~ .
I
SITE LOCATION MAP
• • • 412 N. Oakhurst Drive I
4335 I 6 I
I shE c~ I
:ALE 1.. , 6 0'-=:.1 --!
+- !
~or µ.~,eel m:mlwr:; Lid ·, I 1; '.' , lr,1c\ thi .. j "'- CODE 2420 - : I CODE 398 31 :' 1'• , ''"" ,;1,,,., I ?. l \_
I ·//J-6!> G - 2 8 -56
2-/-66 // -Zl-6tJ IZ- 4- GI
2 - 28-62
t.!JtJ4tJ93/0
69tJ718249
1~93
cc; ~ 398
2410
2420
2422
la.Jo
0N
ost
u (\J
o..1 N ON
0 st
<...) N I
ci
::j
(D
~ 0:
CJUW 01\J > 0"1'
u N W (D
~o - o - o..., r ·
UN
7 -:::;z. ~
100
--
I
~
~
100
'
FOR PREV. ASSM'T. SEE I ~99 - 6
DOHENY I H.LJ. M . 37 - 1-c.'
. TS
0)
"1 :::, "'i
~ 13 ,_:;:,
'.:? "
.38.90
~
J8.68
® "' ")
<::, "','
12 ®,~ "'
~ ,;
3674
,..__
lo
i"'-
I"-
S I. .JI "
14 IS
@) ® .5"/ 3 1 "
.5'/. 3 / "
@
11 10
®
SI..JI "
~ 6-l ~ ~ ~
S i .JI ~ ~T !'.! "'T o,
' ' ~T~ T
I S l. 3 1 51 3 / 5131 "
t:l 16 0)0) 17 "' "' 18 "' ~ 19 ~ ~ 2J 21
~ ~ PoR f ~ PoR. ~ °' POR. ~'Q PoR. '"'-'. PoR.
'v ' ' ~ ~ '~
' @) I @ @ I @"") I
® )
I
I
I
I
" ,, "
B\;-K, I 2
" "
- --------- .50/ • //!Z. 65 : -_;:~--~-- IOZ. 60'
:,
. ._ . . . @ i
0 HEET 3 ~ SHEET 2
,;., ~ tl..P54c. ~ N "i
'" ""- ~ ~ ~ \ ~- ~ " ~ ~ ~ 'S
9 : 2 . . I 2 . . . 1 ~--· . - - , o:;a:::. - @ . @ L
~-" ~ ~ ~ ~ "" "' I ,uc?//c <\i • '~ ')
<\j
~ ¥ r 2 ~ ~ I .51.31 : lc?2.6S . 6/.3,1 /OC.66
412 N. OAKHURST DR.
OAKHURST
TRACT NO. 564 7
M.B. 60 - 88
CONDOMINIUM
TRACT NO. 31215 --- - - M. B . 84 I - 6 3 - 64
CONDOMINIUM
TRACT NO. 3 I 632 .. .. ..
M. B . 847 - 5 I - 52
CONDOMINIUM
TRACT NO. 48073 . . .
M. B. 11 74- 9 - I 0
~ .0'0856'[
T
,,
22 PoR. "I"
"
5/.3/
~ ~
""' ~ ~ 'r-,.
3 -
"' ~ 'is ~ ~ Ii Ii 513/
DR
SI.Ji 36 41 ~
-~-
(l)
23 ~ 24 PaR. ~ POR. 0) ~j
,.
i's ~ ~ ~ ~
@) ~
~
51..31 .S/41
~
.5"l..31 514/
® ~
'r-- ~ "
2 I
@ ~ '-.
'1' " S l..3/ 51.41
l;;
DR.
GO 0:
0 z
w
0 _J
-< --
60 '100219
J/tt.~? 2 1 (,::/.._) {~/
/40927402
/60:3/11401
85/tJ/8r.:c!,:J - ,8C,
ar, o;cyo!?oz f?;
a'8 -i/ c<.OcJ /t'IC/
;J//J/i//&?011//11/&C/•~7
91090:.:I
9IP9259100/t10 Z-07
9303/ 7
co
())
(")
~..J
Cl
C
Cl
0 <t
(\J
w
0 0
u
' ;~ ~ ~: ~1: :~~)~~~i c ; ~ ~rpi i ~;~ si. c?J ~f .'-~-:1i ~~:;.~ ~ g dJ-;;:~~si~11:l~~ ! Pl an·~ i r. c ! ud l ,; .:11 r iJn h dn ci i.ntercsts i r t he c ommon areas as- set ·f ,) rth in cfecas of recorC:.
Con::lon i n i VO",
Plan 1;:<?·ft:ren, 1;,· fnct of Airs ace'
7fi568 4- 30 - 74 Sheet 2
r. mo1131 ,·,5--3 1-91 1rno73 S ~1ee t 3
ASSC:-5-~!)1? 1S MAP
C0" NTY OF LO~ ANGELES , CAL IF .
DlPAITMlNT USE 0NL 'I'
TOTAL FEE
APPLICATION
APPROVED
a~., I L D I N (;
H\IIIL 'I' HILLS, CALlf0.NIA
LOT BU(. 2 TR.
DESCRIPTION
OF WORK A artment - 15 Unit
PROPOSED .USE.
OR OCCUPANCY
5647
.,. ! j ; : ♦ i • I
PLAN ON FILE PLAN ON BACK NO PLANS 1-~,-.~~--,,.,...--.--------• OWNEU AD0RES5 5514 Wilshire Blvd. ~
AREA OF NO. OF DWELL.
BLDG. UNITS
STORIES HEIGHT
FRONT SIDE
SET BACK SET BACK L.
PARK SPACES PARK SPACES
PROVIDED REQUIRED
INSURANCE COVENANT BONO
ENGINEER
'.>0
yc=-s
CITY ANO
ZONE
CONTRACTOR
·:_ .. ,'.:.l'..J J
Los An eles PHONE938~6269hlLawrence Dinovitz ' • 1~ Lt .~u.v CONIAA<;TOR S
4 .,.. . , , --;"-~ - . .. --; . f . . ~J,l ._. L ··1• .. ~~ ,'DDAESS! I • o5l :Cerrilllt>s . ; .\ • j:i_i.'L :J
VALUATION
OF JOB $ 460 000
ARCHITECT Ehud Feldman
ADDRESS 8201 Beverly Blvd11HONE 653-4410 ADDRESS 8322 Beverl nlvd .PHONE 655-6982 STATE
LIC. NO.
CITY
LIC. NO.
STATE CITY
UC. NO. LIC. NO.
IMPORTANT
Application 11 hereby made to the Oiu,ctor of Building and Planning for a p1umit subject to lhe c0ndlli0r1 and rulrlctlans sat forth an the front and rear faces ol rhit applicahan.
I. The oppliconl ce,1ilie1 rhal all workmen 1holl be covered by W0rlmen'1 C0mpen101i0n Insurance in accordance with tho law, of 1he S1are of California governing 1he ,amo.
2. Eoch person upon whose behalf this application i1 mod~ and each person al whose requo II ond 101 whoso benefit woril 11 pe,lormed under or punuanr 10 any po,mir iuued 01 a re1ull of rhi1 opplicolion ogreei to, and shall, Indemnify and hold harmless rhe Cily al Beverly Hill1, ill officers, ogenll and employees in accordance wilh the pr0vl1ion1 of Secllan 9·9,201 of lhe Beverly Hills Municipal Code.
3. Any permit iuued 01 11 re1uh of 1hi1 application bocomes null and void ii work 11 not commenced within SIXTY 160) DAYS from date of iuuance of such pormil. SIGNATURE OF • •
AP;CA7'~j ~~
731.:is
APPLICANT
l'.i\Y ·?. r)-1; 5 2 z 3 r: i?
--~-:l.9,73 -0,2 2 37 z_
OEC·2~·73 s :3 s 9 9 3
I;. -J.ct-7 3 5" 3 s-? Ll
.. _, .... l"l , 1 O' '•I I' . ; - • V
l:Utl2.0C
4~., ij' '
• .
1 --1~L~, ,
~r,l~P llPLpll ; ' 1r,•.~11 .,
,· ,:
... l . .. . .
•= .... . .. . . .. .. ~ .J_,. J -- ~·· . . .... • .. .. ·~* .. H b'l 0 611 4,z~~ .. ,~ I ( . .i. ~ ' •~-t-,:
-- '.
~ - I ' ' .~ ! _,
Ir i ' ·, \'.
..
... : ,I
•
'
·' · : f'
,., .
, .. -J,~ : .. C- :,
~ '• ' ' ' "' ,. . ._: , I t .. ! I •. -~ ' "· l I ,. ' \)
r I : .:.i S l I _,;.~ ":l. "" 1-!J'""""' ~ -- . ,_ ,I - ' ,··~. r i ~ _ ... ..,. _, _, . j -'I ' ~ ~ I ii: ~ t 1 i D . ··-
~ ~ ·,
i ; 1 - ·; .. I ..
l • I ~ i
' - ' ) -~ p:f j
l • ' I u1Vf-T I . J • I . .,. = l
- ~ ' ~"<t" l , ~ ' - ~,
t .• -~
' ... - .... ' ~
-- ~,• IZII' 4-1-11 ; , .-N "' -- '
'2':1'.pll lltl1
-c'11 :
r ; . ···1 ,' ·1~•="u I,
·•·; , .- : ,. .. ~· ~ 1~'-~•
? ..
b 116
- ., •At"!~,•~uow .toR.-n ... sr!CTION Of·NJ:W BUILDING-' -.<ai,·N~r~-:,·;:·"' ,. cit. OF 1.os ANG£t.ES AND f.Ok ClRTtPfCATl OF QC<;UPANCY. · Uf.ll<f,..OF'l!UILlllHf.U,~m fHSTRUCTIOMSr ,. Applkont1 tG Complct. Numbered Item, Oniy.. 2. Plot Plan Rttqi,{,.d on .Boc;k of OritG.E:,.
2. l' PUl omG
• artment
a. J 412 N. Oakhu:rst
AND Beveraly Bouleva~d
S~ OWNERS JMTAE PHONE
Lincoln Prop C. 659-3944
6. OWNER'S AOORESS CITY ZIP
LtCENSE No. PHONE
a. ENGUEER Erkel Greenfield
LICENSE No, !'HONE
SE1513 653-4410·
9, CQNT!'!ACTOR STATE LICENSE No, PHONE
Morel
10, LE.NOE~
Uni.on Bank S.F. 455 Montgomery
11, SIZE Of tlE\'1.1:J:°6• 8 4 6 rORIES H¾GHT Ng QF EXISTING BUILDINGS ON LOT AND USE t.aiGTH \~Dll'l .... 3 3 2 apts/2 P:kg strcu
12. ~1ffff?J~M6u EXT,WtJ'od RooF wood FLOOR wood
1 13, ,JOB ADDRESS 412 N. Oakhurst Drive
(1() I --::=
GUEST REQ'D PROVIDE
ROOMS D 30 3
CONT, INSP.,
'5oa,c ~ 5dce, "'- o
S.P.C. G,P,f. B.P.
/ JD/:A,.
LOT SIZE
102.62/lSC
ALLEY
20 R
~~iVfi&x ·f.t(!: •.
o:f frontai,r
in Bev RK
DJSTR!CT OFFICE
ZOijEO BY siwmsvold
FILEWlTit
PLAN CHECI< EXPIRES SIX MONTHS AFTER FEE JS PAID. PERMIT EXPIRES ONE VEAR AFTER FEE IS !'AID -OR SIX MOUTHS &r· FEE IS PAID IF COllSTRUCTIO/l IS NOT COMMEtlCEO.
~ . . . MAY· 30-75' o--•f•Ou•----•- 01192 Y - 6 CK 1,145.58 ~-----~-~~-···-...OCT-30-73 !!l 324 9 2 t 0 80075 c:::
UJ_--70-•• ,... .. -_ ..
::c
~ u_it_...:,,.~e•.a.-w•..,
,.. STATEMENT OF RESPONSJBILJTY ,
I certify that in doing the work outhori:zed hereby I will not employ any person 1n violation of the Labor Code of the State of California relating to workmen's compensation insorance, "This permit is on application for inspection, the issuance of which is not on approval or on outhor..- izotion of the work specified herein. This permit does not authorize or permit, nor shall it be constrµet! as authorizing or permitting the violation or failure to comply with any applicable low. Neither the CiW of Los Angeles, nor any board, deportment, officer or employee thereof make any warranty or shall be responsible for the performance or results of any work described herein, or the condition of the property :~g::~ .. ~~-on w::a:or~ is ~t~~zt {See Sec. 91.0202 L.A.M~::e Dote Conservation
Plumbing
Plonnlng
Ffre
•
<O ror A~nU
sEWERSAYAlt/ffll$c due 3992. 50 DeWidt/Shum
NOT AVAILABLE
DRIVEWAY APPROVED non w dwy Shum 5-29-
HIGHWAY DEDICATION REQUIRED
"'.'c--:o~:--.,,,:-:-1.--:Et-:-ED----t-------------.1-.-.--------
FLOOD CLEARANCE APPROVED
APPROVED FOR ISSUE
FlLE#
l'RIVAT£SEWAGE DISPOSAL
SYSTEM APPROVEb
APPROVED UNDER
CASE#
APPROVED mn.E 191
(L.A,M.C.-5700)
·'l I
I
I
i I ,,
I
I
-.
-1 ·:i
··~ '
i:;==11
• I-, •
'\ > ~ -, ~ -h - • ,_
.
.. -- ' -
'= . . .. ----
_,
I
--=i~o~i' t. . - -~ -ff~" o,eii l¾-11 ,v ~;&.JI t~r$.: 4~a~f- : .... ~ -i i ,.. . . 1oi1.,.1.'fz.JJ <.N.'1:$.) • ; • • • 1 ' 1
) ' - ' ', --~,;ta,.',!,""'* > ~~~--~~~~~~~.k:!l .. ~~-t-.......... ;t~J . J_ , L. H5Vli tJO :1sn QNV .LOl NO ~~Nli:l1~~a :nv (,".Om~, l'-1"1'11 .LO'llJ NO \ di~ 17Hl1f~- . •. , .•
t:7~ ,q.U 1-lfl ~ I " 4~ .:t 4J}J-;..::~!1(fc?;4~. f..TOIJ.o~jql-J~ $. 4;1)J_ ttJ..t~ J.?.-:a~J lJ(lif.uH0~1-1M • )~ • ~--- ·v -~~r· t1t-t1~1riee1 - • • v1N~l1¥? J,. dvit? (4~1?W ~1'1 J; .JJw,w .. . ~?'H~ JJ.Wrlt?? ~f-JJ; v 4?tJ,lp • ~HJ; HI -~~:
# -46 ~W.-.:1 .'11 ;I~ Hl Ct~Miti Jlf,.1- "el~ o/'-1
L+~ ·tJ~ l~t J~ ~ °7i?P1ia ~I ~ 9 _L ~W1 -
3 APPLICATION TO ADD-ALTElt-REPAIR-DEMOLlSH
CITY OF LOS ANGELES AND FOR CH.TIFICATE OF OCCUPANCY DEPT, OF IIUILDING AND SAFE'I\' INSTRUCTIONS: .Applicant to Complete Num!Jered Items Only.
I, LOT
LEGAL
OESCR. 7 & 8
2, PREiE,tiT USE OF BUjLDING
< U:> Apt.
3, JOB ADORES
412
4, BETWEEN CR ST S
!ILK,
2 TRACT
5647
NEW USE OF BUILDING
<05 > same
--=-=~A~l~em _______ _M~leJl~aly_Bl¥4,,..,_ __ --1.-1,L·ns:a,· e
5. OWNER'S NA >T~
---=--:::-~D=a=vY-i:?.:i'::'.::-==~-----.....,_,._.._~~------:;;-::--------1102.62/150 6, OW AD 14 Wilsh
ALLlcY
a. STATE LICEIISE No. PHONE
AFFIDAVITS
--=-=---,,,~c,.;=.=-=------==------------,,=,-----PP 40 10, ADDRESS STATE LICEIISE No. PHONE
--=:-=:-===U~n~i~o~n~~~~==-~~~~~~~~=""-=-~~:----1of front 11, SIZE OF EXISTING BLD j I
WIDTH 110 LENGTH in Eev HI1
12, CONST, MATERIAL
OF EXISTING BLDG. ~-~
13, JOB ADDRESS 3 412 N. Oakhurst Dr.
14' r~bf~k0
J'T TJH~fk~8\foLpm~ $
1 5, NEW
(Describe)
WORK:
AND
C
USE PROPOSED BUILDING
---
I SIZE OF AD!:!TION
(.) I"-"'
TYPE
.-:,0:--.
BLOG,
AREA
1L
DWELL,
UNITS ;vie,_
P.C.
GROUP M ,., occ. -- (.,
MAX
occ.
F-1
/
TOTAL
.{I/ c:...
GUEST ,/
ROOMS/l'lC.-
PARKING REQ'~/ PROVIDED
CONT,
INSP.
S.P.C,
IV/ c.-
11.P •z;... I.F.
PLANS C
DIST. °t"J.tE
7m. SOIL
GliWAY OED.
P.C. No. PLAN CHECK EXPIRES SIX MONTHS AFTER FEE IS PAID. PERMIT EXPIRES ONE YEAR AFTER FEE IS PAID OR SIX MONTHS AFTER FEE IS PAID IF CONSTRUCTIOl{ IS NOT COMMENCEO. f ~7:li" ~ z------
0 ILi
~----1 •• -,..,, .., _____ _
Y-1.CK 6.30
:i:
~----- ST A TEMENT OF RESPONSIBILITY
I certify that in doing the work authorized hereby I will not employ any person in violation of the Labor Code of the State of California relating, to workmen's compensation insurance. "This permit is an application for inspection, the issuance of which is not an approval or an authorization of the work specified herein. This permit does not authorize er permit, nor shall it be construed as authorizing or permitting the violation or failure to comply with any applicable law. Neither the City of Los Angeles, n;i any board, department, officer or employee thereof make any warranty or shall be responsible for th erf rm e re.suits of any work described herein, or the condition of the property or soil upon whi such work • erf~rmed." [See Sec. 91.0202 L.A.M.C.) Signed_' --- .. -nr-• .. - - - ·•-·--_'d_ ____ Signature/Date (Owner or Agentl Bureau of ADDRESS .APPROVED .,,,...,... i II A(')(')'71::: /'7'2 Engineering SEWERS NO SEWER/PLUMB~NG REQ'D . - - SFC NOT APPLICABLE
SFC PAID
SFC DliE.
DltlVEWAY .
HIGHWAY DEDICATION REWIRED
CCJ.IPLETED
FLOOD CLEARANCE
Conservation APPROVED FOR lSSUE 0 NJ FILE Q
Fire APPl'IOV~ mn.E 191 (L,A.lot.C..-S700)
Plumbin~ Pl'IJVATE SEWAGE SYSTEM A1"0VED
Plat1ning APPftOVEl> UNDER CASE#
Traffic APPROVED fOR
,~- .I',
--
PHOTOGRAPHS: 412 North Oakhurst Drive
Front (west) façade view, looking east (MLS) Front (west) facade, looking east (MLS) Aerial view (front elevation), looking northeast (MLS) Aerial view (front elevation), looking southeast (MLS) Aerial view (rear elevation), looking northwest (MLS) Aerial context view, looking southeast (MLS) PHOTOGRAPHS: 412 North Oakhurst Drive
Front (west) entry details (MLS) Entry lobby, looking west (MLS) Interior courtyard area (MLS) Interior courtyard area (MLS) Front (west) façade view, looking northeast (2001, BH) Rear (east) elevation, looking northwest (2001, BH) PHOTOGRAPHS: 412 North Oakhurst Drive
Aerial view 400 block North Oakhurst Drive, all designed in same configuration plan by Ehud Feldman (1973-1974)
THIS PAGE INTENTIONALLY BLANK
END OF DOCUMENT
City of Beverly Hills 345 Foothill Road Beverly Hills, California 90210 t(310) 285-2467 f(310) 278-1838 BeverlyHills.org Vince Damasse, P.E.
Water Resources/ Operations Manager
Public Works Department
July 23, 2024
Oakhurst Skyline, LLC
ATTN: Avi Stieglitz
150 S. Rodeo Drive, Suite 340
Beverly Hills, CA 90212
Subject: Conditional Water Will Serve
Proposed (8) Story Multi-Family Housing
412 N. Oakhurst Drive., Beverly Hills, CA 90210
Dear Mr. Stieglitz,
This Conditional Water Will Serve letter confirms that your proposed development lies within the City of Beverly Hills water service area. This conditional letter is contingent on the City’s analysis of your proposed water demands and the potential impacts to the City’s water infrastructure. Plans and calculations shall be submitted for the City’s review and approval once available. Depending on the complexity of your project, a hydraulic analysis may be required to determine impacts to the City’s water system. All applicable fees including but not limited to application processing, plan checking, connection, water capacity, water supply and wastewater fees shall apply.
Please contact me at 310-285-2491 should you have additional questions and/or concerns. We look forward to working with you.
Vince Damasse, P.E.
Water Resources/Operations Manager
~
18WERLY
H ILLS
-~
.,
ATTACHMENT 11
Applicant-provided
Incentives/Waivers Narrative
400 South Hope Street, 8th Floor | Los Angeles, CA 90071 | T 213.896.2400 | F 213.896.2450 Holland & Knight LLP | www.hklaw.com
Ryan M. Leaderman
+1 213-896-2405
[email protected]
Atlanta | Austin | Birmingham | Boston | Century City | Charlotte | Chattanooga | Chicago | Dallas | Denver | Fort Lauderdale Houston | Jacksonville | Los Angeles | Miami | Nashville | Newport Beach | New York | Orlando | Philadelphia Portland | Richmond | San Francisco | Stamford | Tallahassee | Tampa | Tysons | Washington, D.C. | West Palm Beach August 6, 2024
David Snow, Assistant City Attorney
City of Beverly Hills
455 N. Rexford Drive
Beverly Hills, CA 90210
Re: 412 N. Oakhurst Drive/Application Waiver & Incentive Analysis Dear David:
My client, Oakhurst Skyline, LLC (the “Applicant”), is excited that its Project (as defined below) at 412 North Oakhurst Drive (the “Property) will bring much needed housing to the city of Beverly Hills (the “City” or “Beverly Hills”) and help it achieve its Regional Housing Needs Allocation with the inclusion of market rate and affordable housing.
The Property is situated in both Beverly Hills and the city of Los Angeles (“LA”). Approximately 28% of the Property is in Beverly Hills and 72% of the Property is in LA. The Project includes 12 units in the City portion of the Property (nine are market rate and three are affordable).1 There are 39 units in the LA portion of the Property (33 are market and six are affordable).
The Project utilizes State Density Bonus Law (“SDBL”) to achieve the density proposed along with incentives and waivers, consistent with case law. While an applicant is not required to prove requested incentives will lead to cost reductions, an incentive is presumed to result in cost reductions, and a city bears the burden to demonstrate otherwise if it intends to deny the incentive or waiver.2 Similarly, the burden is on a city to establish an exception applies to a requested waiver.3 Nevertheless, this letter is in response to the request of City staff (“Staff”) that Applicant 1 The 12 total units in the Beverly Hills portion of the Property consist of six base density units, three density bonus units as a result of providing 15 percent Very Low Income units, and three AB 1287 density bonus units as a result of providing 10 percent Very Low Income units.
2 Schreiber v. City of Los Angeles 69 Cal.App.5th 549 at 555 (2021); Bankers Hill 150 v. City of San Diego 74 Cal.App.5th 755, 770 (2022).
3 Bankers Hill at 770.
David Snow
August 6, 2024