AGENDA REPORT
Meeting Date: September 9, 2025
Item Number:
To: Honorable Mayor & City Council
From: Daren Grilley, Assistant Director of Public Works/City Engineer Christine Chung, Project Manager
Subject: FINAL NORTH CAÑON DRIVE CLOSURE EXTENSION
CONSIDERATION
Attachments: 1. July 24, 2018, Agenda Report
2. September 21, 2021, Staff Report (without attachments)
3. September 12, 2022, Staff Report (without attachments)
4. June 6, 2023, Staff Report (without attachments)
5. November 7, 2023, Agenda Report (without attachments)
6. May 21, 2024, Agenda Report (without attachments)
7. November 7, 2024, Agenda Report (without attachments)
8. Metro’s Extension Request
9. Stakeholder Comments
RECOMMENDATION
Staff recommends that City Council (1) review the request from the Los Angeles County Metropolitan Transportation Authority (Metro) for a final five-and-half month extension of the temporary closure of North Cañon Drive at Wilshire Boulevard until March 14, 2026; (2) conditionally approve or deny Metro’s request; and (3) provide feedback on recommended permit conditions, if applicable.
INTRODUCTION
On July 24, 2018, City Council approved the temporary closure of North Cañon Drive for a minimum of two years and up to six years to mitigate the construction impacts of the Los Angeles County Metropolitan Transportation Authority (Metro) Purple (D) Line Extension – Section 2 project (Attachment 1). Per Article XII of the Memorandum of Agreement (MOA) with Metro, the street was closed, and a cul-de-sac was created in September 2019. A temporary sound wall featuring a mural by Tomokazu Matsuyama was also constructed across North Cañon Drive at Wilshire Boulevard. The current
BEVERLW
HILLS
d
Meeting Date: September 9, 2025
street closure with the sound wall is approved until September 2025. On June 13, 2025, Metro requested to delay removing the sound wall and cul-de-sac to March 2026 to align with the expected completion of Beverly Dr Station and ensure safe access to the Cañon Staging Yard, as access from Wilshire Boulevard may be limited.
DISCUSSION
On September 21, 2021, City Council approved a one-year extension of the temporary closure of North Cañon Drive until September 30, 2022 (Attachment 2). On September 12, 2022, City Council approved a nine-month extension of the temporary closure until June 30, 2023 (Attachment 3). Subsequent six-month extensions were approved on June 6, 2023, until December 31, 2023 (Attachment 4); on November 7, 2023, until June 30, 2024 (Attachment 5); and on May 21, 2024, until December 31, 2024 (Attachment 6).
Finally, an additional nine-month extension of the temporary closure was approved on November 7, 2024, until September 30, 2025 (Attachment 7).
Anticipated Construction Through 2026
Construction of the Beverly Dr Station on Wilshire Boulevard (between Beverly Drive and Crescent Drive) is progressing and expected to be mostly complete by summer 2026. The station is tentatively set to open in late 2026. The 20-foot sound wall continues to help reduce noise, dust, and traffic impacts while maintaining safe access to businesses.
Work on appendage structures, such as emergency exits and ventilation shafts, will continue through early 2026. Some of the structures are located near the Wilshire Boulevard and Beverly Drive intersection.
Street restoration, including utility work and permanent road repairs, is also expected to finish by early summer of 2026. Until then, Wilshire Boulevard will remain reduced to minimum two lanes in each direction, with K-rails and fencing in place for safety.
If the closure and sound walls are removed after September 2025 but before March 2026, construction on North Cañon Drive would need to occur twice: first, for temporary street restoration to reopen the road early, which would take one to two months; and then again, for an additional two months, to complete the permanent restoration from Wilshire Boulevard to Clifton Way during the third quarter of 2026.
Reopening the street early would result in unpredictable traffic patterns, requiring frequent changes at the Wilshire Boulevard and North Cañon Drive intersection, including lane closures and turn restrictions. Daily traffic control would be needed from Wilshire Boulevard to Dayton Way with detours, message boards, traffic cones, and restrictions on valet and on-street parking.
During street restoration in 2026, access to the Cañon Staging Yard will remain necessary with construction vehicles entering and exiting North Cañon Drive daily. This will require ongoing traffic control along North Cañon Drive to maintain safe and consistent yard access.
Removing the sound wall would also lead to intermittent sidewalk closures and increased impacts from noise, dust, and lighting for nearby businesses. In addition, early removal would introduce irregular traffic detours and more heavy lane reductions of Wilshire Boulevard and North Cañon Drive. There is also a higher risk of heavy Metro construction vehicles using North Cañon Drive, which violates approved haul routes.
Meeting Date: September 9, 2025
If the closure is extended and North Cañon Drive reopens by March 2026, permanent restoration work can begin in early 2026. This work includes removing the sound wall and cul-de-sac, restoring sidewalks, paving, and installing final striping and signage along North Cañon Drive from Wilshire Boulevard to Clifton Way. The restoration is expected to take approximately two months with a permanent reopening of North Cañon Drive by March 2026.
At the same time, sidewalk restoration on the north side of Wilshire Boulevard between Beverly Drive and Crescent Drive will be substantially complete, allowing removal of Krails and fencing in that area. Restoration on the south side of Wilshire Boulevard will continue behind K-rails, with eastbound traffic remaining reduced to two lanes, while all three westbound lanes will reopen with intermittent lane reductions. As construction progresses, overnight lane closures on Wilshire Boulevard are expected to occur less frequently.
During restoration in 2026, access to the Cañon Staging Yard will continue, although construction vehicle activity on North Cañon Drive will be for a shorter duration compared to an earlier reopening. Traffic control with flaggers will be necessary for any oversized deliveries and equipment access to the yard.
After the 20-foot sound wall is removed, Metro will continue noise and dust mitigation, using sound blankets and water spraying, in accordance with the MOA.
City Council Ad Hoc and Staff Recommendations
On July 2 and July 30, 2025, the Metro Ad Hoc Committee, which includes Mayor Nazarian and Councilmember Friedman, was briefed on the North Cañon Drive closure extension request, upcoming Metro construction in 2026, and initial feedback from nearby stakeholders.
Given the anticipated construction impacts before and after March 2026 and concerns regarding safety for businesses at the Wilshire Boulevard and North Cañon Drive intersection, the Ad Hoc Committee asked staff to confirm with Metro whether North Cañon Drive could commit to reopening by mid-March 2026 and implement measures to ensure intersection safety and minimize construction impacts post reopening.
Staff discussed these conditions with Metro, and Metro agreed to the following:
1. North Cañon Drive shall be permanently reopened by March 14, 2026 – 7:00 a.m. No further extensions will be considered beyond this date. Work shall start early enough to allow for complete street restoration and punchlist by March 14th to avoid impacts during any Academy Awards related events. (Note: the Academy Awards ceremony will be on March 15, 2026, and no work is allowed on this date per the MOA.)
2. The Contractor shall coordinate with the City to maintain access to North Cañon Drive north of Wilshire Boulevard and mitigate construction impacts to adjacent businesses while the North Cañon Drive reopening work is completed.
3. By March 14, 2026, the temporary driveway access at North Cañon Drive must be removed and permanently restored as sidewalk. Until construction is completed, or the Temporary Construction Easement (TCE) expires, access to the Cañon Yard shall be maintained via the temporary driveway on Wilshire Boulevard, located east of the South Cañon Drive crosswalk. Metro shall permanently restore the driveway to Meeting Date: September 9, 2025
sidewalk, curb, and gutter once yard access is no longer needed or prior to the TCE expiration, whichever is earlier in 2026. Additionally, any improvements damaged by construction or restoration near the driveway shall be repaired by Metro.
4. Directional closures on North Cañon Drive shall be limited to the overnight hours of 11:00 p.m. to 7:00 a.m. If directional closures of North Cañon Drive are proposed during business operations or traffic peak hours (7:00 a.m. to 11:00 p.m.), Metro shall pay the City $20,000 per day for each day such closure is in effect.
5. Final street restoration in 2026 shall include widening of the crosswalks across Wilshire Boulevard at North Cañon Drive and at Beverly Drive. The City will reimburse the incremental cost for the increased striping.
Environmental Considerations
The Final Environmental Impact Report (EIR)/Environmental Impact Statement (EIS) prepared by Metro covers the impacts of North Cañon Drive closure at Wilshire Boulevard until the end of Purple Line Extension – Section 2 construction.
Community Engagement
City staff completed the following stakeholder meetings and outreach to receive feedback on the proposal to reopen North Cañon Drive by March 14, 2026, under the recommended conditions.
Staff presented at the Monthly Chamber of Commerce Stakeholder Meeting on August 14, 2025; the Chamber shared a letter of support on August 27, 2025 (Attachment 9).
Staff presented at the Beverly Hills Chamber of Commerce Government Affairs Committee (GAC) meeting on August 14, 2025; the GAC supported the staff recommendations.
Staff informed the Next Beverly Hills Committee and the Arts and Culture Commission representatives on August 15, 2025; no questions or comments were received.
Staff informed the Rodeo Drive Committee (RDC) representatives on August 11, 2025; Two Rodeo Drive expressed concerns about the certainty of the reopening date and inquired about additional traffic mitigations along Dayton Way and North Beverly Drive. Metro has committed to meeting this deadline, and the City will closely monitor and coordinate with Metro to ensure that restoration work begins early enough to meet this timeline. Staff also followed up with Two Rodeo Drive to address specific questions about Dayton Way and reassured that traffic will be monitored throughout the construction period. The RDC representatives had no objection on the staff recommendations.
Staff informed the Beverly Hills Conference & Visitors Bureau (CVB) on August 11, 2024; the CVB representative supported the staff recommendations. One-on-one contacts were made with stakeholders located along North Cañon Drive between Wilshire Boulevard and North Santa Monica Boulevard in July and August 2025. Some of the stakeholders include Brickstar Capital, the Maybourne Meeting Date: September 9, 2025
Beverly Hills, 9401 Wilshire, Spago, Canon Business Properties, Inc., and 190 N Cañon Dr. – Fred Hayman Building.
Brickstar Capital and several other stakeholders raised concerns about how the March 14, 2026, reopening date can be assured. Metro has committed to meeting this deadline, and the City will closely monitor and coordinate with Metro to ensure that restoration work begins early enough to achieve it. Additionally, the Independent Compliance Monitor will continue overseeing the construction site to verify adherence to the terms outlined in the Memorandum of Agreement (MOA).
Spago requested that the sound wall and cul-de-sac not be removed before the Golden Globe Awards on January 11, 2026. Metro confirmed that the removal will not occur until after that date.
Overall, the stakeholders supported the staff recommendations. Cañon Drive Closure extension notices were mailed to the residents and businesses bound by South Santa Monica Boulevard, Wilshire Boulevard, Camden Drive, Olympic Boulevard, and Rexford Drive on August 19, 2025.
These same notices were emailed to the City’s contact database on August 15, 2025. Links to this notice and upcoming City Council meeting agenda items were posted on the City website.
One comment was received from a business owner on Wilshire Boulevard requesting that Metro provide $10,000 in compensation per business for the additional disruption caused by the extended closure. The business owner noted that the closure created inconvenience for residents, visitors, and shoppers, and resulted in a loss of business for local merchants. Staff acknowledged the concern and emphasized that this final phase of construction will require appropriate mitigation measures from Metro. Staff also provided contact information for Metro’s Small Business Support Program to assist businesses impacted by the Purple Line Extension construction. Additionally, the business owner urged the City to either deny Metro’s request for an extension or, alternatively, advocate more strongly for the interests of local merchants (Attachment 9).
Overall, staff has received support or no objections to the 5.5-month extension and reopening of North Cañon Drive by March 14, 2026, from local businesses near the closure and multiple business committees. While a few concerns were raised about potential impacts from the extension, these will be addressed through the mitigation measures in accordance with the recommended approval conditions.
Next Steps
Given the ongoing above-ground construction anticipated in 2026, staff recommends approving a final extension of the North Cañon Drive closure through March 14, 2026, with the measures recommended. This would help minimize impacts on nearby businesses, maintain safety at the Wilshire Boulevard and North Cañon intersection during construction, and ensure continued safety after reopening.
If the final extension is approved, staff will notify the mural artist at least 30 days in advance of the planned removal, as required under the art agreement, and coordinate Meeting Date: September 9, 2025
with Metro to remove the temporary sound wall. Staff will also work with adjacent businesses to reduce potential disruptions during the restoration.
If the extension is not approved, staff will coordinate removal of the mural and sound wall by November 2025 and work with Metro and businesses to minimize conflicts during the temporary and permanent restoration periods.
FISCAL IMPACT
There is no direct fiscal impact associated with approving this request. Per the MOA, Metro is to pay for the installation and removal of the sound wall and other work associated with the closure, as well as reimburse the City for its associated costs.
Funds are available in the approved budget for CIP No. 00050 for Metro project-related mitigation and engineering expenses, including monitoring of North Cañon Drive closure and maintenance of Public Information Graphics and mural on the sound wall until its removal.
Shana Epstein,
Director of Public Works
Approved By
Attachment 1
çByYLY
AGENDA REPORT
Meeting Date: July 24, 2018
Item Number: F-i
To: Honorable Mayor & City Council
From: Aaron Kunz, Deputy Director of Transportation
Robert Welch, Project Manager
Jessie Holzer, Transportation Planner
Subject: NORTH CANON DRIVE CLOSURE
Attachments: 1. Potential Closure of N. Canon Drive During Purple Line Construction —Summary of Transportation Impact Analysis
2. Final Recommended Roadway Designs
3. Preliminary Design Conceptual Plan Drawings
4. Public Notices
5. Public Information Graphics
RECOMMENDATION
That City Council approve the final recommended roadway designs for North Canon Drive and Clifton Way for the temporary closure of North Canon Drive at Wilshire Boulevard, authorizing the installation of the roadway changes.
INTRODUCTION
In response to stakeholder concerns, on June 27, 2017, the City Council approved a Memorandum of Agreement (MOA) for Metro utility relocation work related to Section 2 of the Purple Line Extension project that included the requirement for a feasibility analysis to study options for temporarily closing North Canon Drive at Wilshire Boulevard to vehicular traffic.
The feasibility analysis, completed by Fehr & Peers consulting firm, concluded that traffic operations during the closure could improve by providing advanced vehicle detour signage, updating traffic signal timings, and the signalization of the North Crescent Drive and Clifton Way intersection. On March 6, 2018, City Council approved the feasibility analysis and approved moving into the design development phase of the project.
City and Metro staff hosted a series of three stakeholder meetings with the businesses on North Canon Drive to discuss design priorities and review drafts of the roadway designs for North Canon Drive and Clifton Way, which are discussed in detail in this
BEVERLY
HILLS
AGENDA REPORT
Meeting Date:
Item Number:
To:
From:
Subject:
Attachments:
July 24, 2018
F-l
Honorable Mayor & City Council
Aaron Kunz, Deputy Director of Transportation
Robert Welch, Project Manager
Jessie Holzer, Transportation Planner
NORTH CANON DRIVE CLOSURE
1. Potential Closure of N. Canon Drive During Purple Line Construction -Summary of Transportation Impact Analysis
2. Final Recommended Roadway Designs
3. Preliminary Design Conceptual Plan Drawings
4. Public Notices
5. Public Information Graphics
RECOMMENDATION
That City Council approve the final recommended roadway designs for North Canon Drive and Clifton Way for the temporary closure of North Canon Drive at Wilshire Boulevard, authorizing the installation of the roadway changes.
INTRODUCTION
In response to stakeholder concerns, on June 27, 2017, the City Council approved a Memorandum of Agreement (MOA) for Metro utility relocation work related to Section 2 of the Purple Line Extension project that included the requirement for a feasibility analysis to study options for temporarily closing North Canon Drive at Wilshire Boulevard to vehicular traffic.
The feasibility analysis, completed by Fehr & Peers consulting firm, concluded that traffic operations during the closure could improve by providing advanced vehicle detour signage, updating traffic signal timings, and the signalization of the North Crescent Drive and Clifton Way intersection. On March 6, 2018, City Council approved the feasibility analysis and approved moving into the design development phase of the project.
City and Metro staff hosted a series of three stakeholder meetings with the businesses on North Canon Drive to discuss design priorities and review drafts of the roadway designs for North Canon Drive and Clifton Way, which are discussed in detail in this
Meeting Date: July 24, 2018
report. If approved, City Council would authorize Metro to install these roadway changes in conjunction with the sound wall.
DISCUSSION
On June 27, 2017, the City Council approved an MOA for Metro utility relocation work related to Section 2 of the Purple Line Extension project. The MOA (AG #348-17) authorized staff to issue Metro the necessary permits for Southern California Edison underground utility relocation work for the future Wilshire/Rodeo Station1. The Wilshire/Rodeo underground station box will span Wilshire Boulevard between Beverly and Crescent Drives, with the on-street work zone spanning (approximately) west of El Cammo Drive to east of Rexford Drive.
During public comment on June 27, 2017, representatives from Spago restaurant and other businesses advocated placing a tall sound wall, creating a cul-de-sac, and providing valet service to assist the businesses and restaurants on North Canon Drive during the disruption created by construction. Spago reported general support of a proposed street closure from adjacent businesses.
A key element highlighted for the approval of the MOA was the inclusion of a feasibility analysis to study options for a temporary closure of North Canon Drive at Wilshire Boulevard to vehicular traffic to address noise, vibration, and pollution generated by construction activity, and to mitigate possible driver confusion due to lane closures required during various construction activities.
Following City Council approval of the MOA (AG #348-17), City staff engaged Fehr & Peers consulting firm to conduct a more detailed transportation impact analysis (TIA) to evaluate construction related impacts to nearby intersections with a potential closure of North Canon Drive at Wilshire Boulevard (Attachment 1). The study area included 15 intersections that extend into the residential neighborhoods, bounded by Brighton Way to the north, North Beverly Drive to the west, Charleville Boulevard to the south, and North Rexford Drive to the east. The analysis concluded that traffic operations could improve by providing advanced vehicle detour signage, updating traffic signal timings, and the signalization of the North Crescent Drive and Clifton Way intersection. It also recommended a review of the striping of Clifton Way during design development to determine if opportunities exist for increasing the roadway capacity to further improve traffic operations.
City Council approved the feasibility analysis on March 6, 2018 and approved moving into the design development phase of the project. City and Metro staff hosted a series of three stakeholder meetings on April 19, 2018, May 10, 2018, and June 11,2018 with the businesses on North Canon Drive to discuss design priorities and review drafts of the roadway designs for North Canon Drive and Clifton Way. The final recommended designs are shown in Attachment 2. At these meetings, stakeholders also discussed three concept designs that consulting firm Psomas — the company on contract with the City for work related to the Metro Purple Line extension — developed in conjunction with the feasibility analysis to start the conversation about potential design alternatives (presented to City Council on March 6, 2018 and shown in Attachment 3).
Throughout the meetings, stakeholders requested a design that prioritizes circulation through the cul-de-sac, retains the existing meters on North Canon Drive, and City of Beverly Hills, City Council Adjourned Meeting.. Minutes, June 29, 2017, Item G-2.
Meeting Date: July 24, 2018
report. If approved, City Council would authorize Metro to install these roadway changes in conjunction with the sound wall.
DISCUSSION
On June 27, 2017, the City Council approved an MOA for Metro utility relocation work related to Section 2 of the Purple Line Extension project. The MOA (AG #348-17) authorized staff to issue Metro the necessary permits for Southern California Edison underground utility relocation work for the future Wilshire/Rodeo Station'. The Wilshire/Rodeo underground station box will span Wilshire Boulevard between Beverly and Crescent Drives, with the on-street work zone spanning (approximately) west of El Camino Drive to east of Rexford Drive.
During public comment on June 27, 2017, representatives from Spago restaurant and other businesses advocated placing a tall sound wall, creating a cul-de-sac, and providing valet service to assist the businesses and restaurants on North Canon Drive during the disruption created by construction. Spago reported general support of a proposed street closure from adjacent businesses.
A key element highlighted for the approval of the MOA was the inclusion of a feasibility analysis to study options for a temporary closure of North Canon Drive at Wilshire Boulevard to vehicular traffic to address noise, vibration, and pollution generated by construction activity, and to mitigate possible driver confusion due to lane closures required during various construction activities.
Following City Council approval of the MOA (AG #348-17), City staff engaged Fehr & Peers consulting firm to conduct a more detailed transportation impact analysis (TIA) to evaluate construction related impacts to nearby intersections with a potential closure of North Canon Drive at Wilshire Boulevard (Attachment 1). The study area included 15 intersections that extend into the residential neighborhoods, bounded by Brighton Way to the north, North Beverly Drive to the west, Charleville Boulevard to the south, and North Rexford Drive to the east. The analysis concluded that traffic operations could improve by providing advanced vehicle detour signage, updating traffic signal timings, and the signalization of the North Crescent Drive and Clifton Way intersection. It also recommended a review of the striping of Clifton Way during design development to determine if opportunities exist for increasing the roadway capacity to further improve traffic operations.
City Council approved the feasibility analysis on March 6, 2018 and approved moving into the design development phase of the project. City and Metro staff hosted a series of three stakeholder meetings on April 19, 2018, May 10, 2018, and June 11, 2018 with the businesses on North Canon Drive to discuss design priorities and review drafts of the roadway designs for North Canon Drive and Clifton Way. The final recommended designs are shown in Attachment 2. At these meetings, stakeholders also discussed three concept designs that consulting firm Psomas -- the company on contract with the City for work related to the Metro Purple Line extension -- developed in conjunction with the feasibility analysis to start the conversation about potential design alternatives (presented to City Council on March 6, 2018 and shown in Attachment 3).
Throughout the meetings, stakeholders requested a design that prioritizes circulation through the cul-de-sac, retains the existing meters on North Canon Drive, and 1 City of Beverly Hills, City Council Adjourned Meeting...Minutes, June 29, 2017, Item G-2.
Meeting Date: July 24, 2018
maximizes on-street parking as much as possible without inhibiting traffic flow. The majority of stakeholders did not support a design that included diagonal parking, either in the median or along the curb as shown in several of the initial concept designs prepared with the feasibility analysis, due to concerns of congestion through the cul-de-sac from drivers waiting for parking stalls.
The final recommended designs developed with stakeholders are discussed in detail below. The Beverly Hills Fire and Police Departments reviewed and approved the final recommended designs.
North Canon Drive
The future sound wall will be located along the northern boundary of the property at 160 North Canon Drive, the future Canon staging yard. Vehicles entering and exiting the staging yard will do so south of the sound wall.
The final recommended design for North Canon Drive between Clifton Way and Wilshire Boulevard converts to one southbound lane to accommodate turning vehicles around the cul-de-sac and retains two northbound lanes. Due to the width of North Canon Drive, the street cannot accommodate two turning lanes around the cul-de-sac. Staff determined with stakeholder feedback that a second northbound travel lane would provide more benefit to the project than a second southbound lane as it would provide sufficient travel space for drivers to go around the valet activity and help maintain traffic flow through the cul-de-sac.
The parking stalls on the east side of the street shift to the north to provide space for the sound wall and for vehicles traveling through the cul-de-sac. One 20 minute metered parking stall on the east side of North Canon Drive at Clifton Way is temporarily relocated to the west side of the street as there is not adequate space for all eight existing parking meters. This shift maintains the existing number of meters on North Canon Drive. The remaining seven stalls on the east side operate as valet parking for Citizen and Spago during certain hours of the day and retain their existing hours of operation, per stakeholder requests.
As the existing crosswalk across North Canon Drive at Wilshire Boulevard will be south of the sound wall, the cul-de-sac is delineated by planters and/or bollards to create a new 10-foot wide pedestrian crossing area, which includes new curb access ramps on each side of the street.
The existing two southbound travel lanes approaching Clifton Way convert to a left turn pocket for vehicles turning left onto Clifton Way and a shared through/right turn lane, maintaining access to the parking structure entrance located at the intersection of North Canon Drive and Clifton Way. Signage at the entrance to the cul-de-sac will alert drivers that there is “no outlet” and that truck traffic is prohibited, as large trucks will be too long to be able to safely travel through the cul-de-sac.
The following design elements are included at the request of the stakeholders:
• Retains existing seven valet spaces
• Retains a second northbound lane that valet drivers can use to more quickly move vehicles off of the cul-de-sac
• Retains a second northbound lane to minimize the possibility of southbound vehicle queuing that may block driveways as motorists wait to access the valet
Meeting Date: July 24, 2018
maximizes on-street parking as much as possible without inhibiting traffic flow. The majority of stakeholders did not support a design that included diagonal parking, either in the median or along the curb as shown in several of the initial concept designs prepared with the feasibility analysis, due to concerns of congestion through the cul-de-sac from drivers waiting for parking stalls.
The final recommended designs developed with stakeholders are discussed in detail below. The Beverly Hills Fire and Police Departments reviewed and approved the final recommended designs.
North Canon Drive
The future sound wall will be located along the northern boundary of the property at 160 North Canon Drive, the future Canon staging yard. Vehicles entering and exiting the staging yard will do so south of the sound wall.
The final recommended design for North Canon Drive between Clifton Way and Wilshire Boulevard converts to one southbound lane to accommodate turning vehicles around the cul-de-sac and retains two northbound lanes. Due to the width of North Canon Drive, the street cannot accommodate two turning lanes around the cul-de-sac. Staff determined with stakeholder feedback that a second northbound travel lane would provide more benefit to the project than a second southbound lane as it would provide sufficient travel space for drivers to go around the valet activity and help maintain traffic flow through the cul-de-sac.
The parking stalls on the east side of the street shift to the north to provide space for the sound wall and for vehicles traveling through the cul-de-sac. One 20 minute metered parking stall on the east side of North Canon Drive at Clifton Way is temporarily relocated to the west side of the street as there is not adequate space for all eight existing parking meters. This shift maintains the existing number of meters on North Canon Drive. The remaining seven stalls on the east side operate as valet parking for Citizen and Spago during certain hours of the day and retain their existing hours of operation, per stakeholder requests.
As the existing crosswalk across North Canon Drive at Wilshire Boulevard will be south of the sound wall, the cul-de-sac is delineated by planters and/or bollards to create a new 10-foot wide pedestrian crossing area, which includes new curb access ramps on each side of the street.
The existing two southbound travel lanes approaching Clifton Way convert to a left turn pocket for vehicles turning left onto Clifton Way and a shared through/right turn lane, maintaining access to the parking structure entrance located at the intersection of North Canon Drive and Clifton Way. Signage at the entrance to the cul-de-sac will alert drivers that there is "no outlet" and that truck traffic is prohibited, as large trucks will be too long to be able to safely travel through the cul-de-sac.
The following design elements are included at the request of the stakeholders:
• Retains existing seven valet spaces
• Retains a second northbound lane that valet drivers can use to more quickly move vehicles off of the cul-de-sac
• Retains a second northbound lane to minimize the possibility of southbound vehicle queuing that may block driveways as motorists wait to access the valet
Meeting Date: July 24, 2018
• Does not add more than one parking stall to the west side of the street, which could lead to vehicle queuing in front of driveways as motorists wait to park • Retains the existing metered parking for business patrons traveling to the area outside of valet hours
• Provides an approximately 10-foot wide pedestrian walkway between the cul-de sac and the sound wall to maintain accessibility
Clifton Way
The feasibility analysis projected an increase in traffic volumes on North Crescent Drive as a result of the closure. As part of the project, Metro will install a new traffic signal at the intersection of Clifton Way and Crescent Drive to improve traffic flow.
The feasibility analysis also recommended exploring opportunities to restripe Clifton Way between North Canon Drive and North Crescent Drive to add capacity to the block. The design temporarily removes parking on the south side of Clifton Way to allow the center line to be shifted south for wider travel lanes. Shifting the center line to the south will provide more space for large vehicles/vans accessing the existing loading zone on the north side of the street in front of Sunrise Senior Living and allow continued operation of the loading zone.
The one-way, southbound alley that intersects with Clifton Way will temporarily convert to two-way just north of the valet-only parking structure entrance, allowing valet drivers to make left turns onto westbound Clifton Way and return to the valet on North Canon Drive. When the closure is installed, valet drivers would no longer have access to the valet from Wilshire Boulevard. Allowing left turns onto Clifton Way from the alley will help valet drivers move vehicles off of North Canon Drive more quickly, which should improve traffic flow. Temporary parking removal on the south side of Clifton Way will also improve visibility for valet drivers making left turns from the alley onto westbound Clifton Way.
In addition, the design temporarily removes one parking stall on the north side of the street at the intersection with North Canon Drive to improve traffic flow by providing space for right-turning vehicles, which should help move vehicles off of Clifton Way more quickly.
Community Outreach
City and Metro staff completed the following community meetings and stakeholder outreach to determine the final recommended designs for North Canon Drive and Clifton Way:
1. Monthly community outreach meetings were held on April 4, 2018, May 2, 2018, and June 6, 2018, and staff presented the final recommended designs at the meeting on July 11,2018.
One resident asked if there would be coordination between the potential closure and construction traffic control for the proposed 700 North Crescent Drive development. Spago suggested removing an additional parking stall on the north side of Clifton Way or shifting the center line farther south to assist valet drivers in making left turns.
Meeting Date: July 24, 2018
• Does not add more than one parking stall to the west side of the street, which could lead to vehicle queuing in front of driveways as motorists wait to park • Retains the existing metered parking for business patrons traveling to the area outside of valet hours
• Provides an approximately 10-foot wide pedestrian walkway between the cul-desac and the sound wall to maintain accessibility Clifton Way
The feasibility analysis projected an increase in traffic volumes on North Crescent Drive as a result of the closure. As part of the project, Metro will install a new traffic signal at the intersection of Clifton Way and Crescent Drive to improve traffic flow.
The feasibility analysis also recommended exploring opportunities to restripe Clifton Way between North Canon Drive and North Crescent Drive to add capacity to the block. The design temporarily removes parking on the south side of Clifton Way to allow the center line to be shifted south for wider travel lanes. Shifting the center line to the south will provide more space for large vehicles/vans accessing the existing loading zone on the north side of the street in front of Sunrise Senior Living and allow continued operation of the loading zone.
The one-way, southbound alley that intersects with Clifton Way will temporarily convert to two-way just north of the valet-only parking structure entrance, allowing valet drivers to make left turns onto westbound Clifton Way and return to the valet on North Canon Drive. When the closure is installed, valet drivers would no longer have access to the valet from Wilshire Boulevard. Allowing left turns onto Clifton Way from the alley will help valet drivers move vehicles off of North Canon Drive more quickly, which should improve traffic flow. Temporary parking removal on the south side of Clifton Way will also improve visibility for valet drivers making left turns from the alley onto westbound Clifton Way.
In addition, the design temporarily removes one parking stall on the north side of the street at the intersection with North Canon Drive to improve traffic flow by providing space for right-turning vehicles, which should help move vehicles off of Clifton Way more quickly.
Community Outreach
City and Metro staff completed the following community meetings and stakeholder outreach to determine the final recommended designs for North Canon Drive and Clifton Way:
1. Monthly community outreach meetings were held on April 4, 2018, May 2, 2018, and June 6, 2018, and staff presented the final recommended designs at the meeting on July 11, 2018.
One resident asked if there would be coordination between the potential closure and construction traffic control for the proposed 100 North Crescent Drive development. Spago suggested removing an additional parking stall on the north side of Clifton Way or shifting the center line farther south to assist valet drivers in making left turns.
Meeting Date: July 24, 2018
2. Monthly presentations were provided to the Traffic and Parking Commission on April 5, 2018, May 3, 2018, and June 7, 2018. The Commission reviewed the final recommended designs on July 12, 2018 and provided their comments to be forwarded to the City Council.
The Commission received one written comment from Co/dwell Banker in support of the final recommended designs due to the revised parking configurations on North Canon Drive and Clifton Way.
Commissioners Meshkaty and Solnit expressed concern that left turns from the alley onto westbound Clifton Way could conflict with through traffic, and that making the traffic signal permanent may not benefit the neighborhood in the longterm.
Commissioner Manaster expressed that he did not support the design in its entirety. He believes the second northbound lane will cause congestion through the cul-de-sac and has concern about making the traffic signal permanent.
Commissioner Seidel expressed support of the designs, but expressed concern about making the traffic signal permanent.
3. Three “Stakeholders” meetings were held on April 19, 2018, May 10, 2018, and June 11, 2018. Stakeholders included the Beverly Hills Chamber of Commerce, Conference and Visitor’s Bureau, Spago Beverly Hills, Citizen, the Montage Hotel, Coldwell Banker, and Douglas Emmett. Staff emailed the final recommended designs to stakeholders on July 9, 2018.
In response to the email, staff received one comment from Douglas Emmett in support of the final recommended designs. Staff did not receive any stakeholder comments in opposition to the final recommended designs.
4. Staff presented design concepts and accepted feedback at the May 10, 2018 Chamber of Commerce Government Affairs Committee meeting and the June 12, 2018 Chamber of Commerce Brokers Roundtable meeting.
Staff answered questions about the designs, but meeting attendees did not provide any comments in support of or opposition to the designs.
5. City staff met with business stakeholders individually to review the designs and answer questions, upon request.
Noticing
City staff mailed public notices (shown in Attachment 4) citywide on July 3, 2018, which included announcements that the North Canon Drive Closure would be discussed at the July 12, 2018 Traffic and Parking Commission meeting and the City Council Formal Meeting on July 24, 2018. City staff also emailed the public notice to stakeholders involved in the design development process on July 3, 2018.
On July 6, 2018, notices (Attachment 4) were hand delivered to the properties below, announcing that the North Canon Drive Closure would be discussed at the July 12, 2018 Traffic and Parking Commission meeting.
• All businesses on North Canon Drive between Wilshire and North Santa Monica Boulevards
Meeting Date: July 24, 2018
2. Monthly presentations were provided to the Traffic and Parking Commission on April 5, 2018, May 3, 2018, and June 7, 2018. The Commission reviewed the final recommended designs on July 12, 2018 and provided their comments to be forwarded to the City Council.
The Commission received one written comment from Coldwell Banker in support of the final recommended designs due to the revised parking configurations on North Canon Drive and Clifton Way.
Commissioners Meshkaty and So/nit expressed concern that left turns from the alley onto westbound Clifton Way could conflict with through traffic, and that making the traffic signal permanent may not benefit the neighborhood in the longterm.
Commissioner Manaster expressed that he did not support the design in its entirety. He believes the second northbound lane will cause congestion through the cul-de-sac and has concern about making the traffic signal permanent.
Commissioner Seidel expressed support of the designs, but expressed concern about making the traffic signal permanent.
3. Three "Stakeholders" meetings were held on April 19, 2018, May 10, 2018, and June 11, 2018. Stakeholders included the Beverly Hills Chamber of Commerce, Conference and Visitor's Bureau, Spago Beverly Hills, Citizen, the Montage Hotel, Coldwell Banker, and Douglas Emmett. Staff emailed the final recommended designs to stakeholders on July 9, 2018.
In response to the email, staff received one comment from Douglas Emmett in support of the final recommended designs. Staff did not receive any stakeholder comments in opposition to the final recommended designs.
4. Staff presented design concepts and accepted feedback at the May 10, 2018 Chamber of Commerce Government Affairs Committee meeting and the June 12, 2018 Chamber of Commerce Brokers Roundtable meeting.
Staff answered questions about the designs, but meeting attendees did not provide any comments in support of or opposition to the designs.
5. City staff met with business stakeholders individually to review the designs and answer questions, upon request.
Noticing
City staff mailed public notices (shown in Attachment 4) citywide on July 3, 2018, which included announcements that the North Canon Drive Closure would be discussed at the July 12, 2018 Traffic and Parking Commission meeting and the City Council Formal Meeting on July 24, 2018. City staff also emailed the public notice to stakeholders involved in the design development process on July 3, 2018.
On July 6, 2018, notices (Attachment 4) were hand delivered to the properties below, announcing that the North Canon Drive Closure would be discussed at the July 12, 2018 Traffic and Parking Commission meeting.
• All businesses on North Canon Drive between Wilshire and North Santa Monica Boulevards
Meeting Date: July 24, 2018
• Properties between the alleys to the east and west of North Canon Drive on South Santa Monica BIvd, Brighton Way, Dayton Way, Clifton Way, and Wilshire Blvd
• Properties on Crescent Drive between Dayton Way and Wilshire Boulevard On July 19, 2018, follow-up notices (Attachment 4) were hand delivered to the following properties, announcing that the North Canon Drive Closure would be discussed at the July 24, 2018 City Council Formal Meeting.
• All businesses on North Canon Drive between Wilshire and North Santa Monica Boulevards
• Properties between the alleys to the east and west of North Canon Drive on South Santa Monica Blvd, Brighton Way, Dayton Way, Clifton Way, and Wilshire Blvd
• Properties on Crescent Drive between Dayton Way and Wilshire Boulevard • Businesses on Wilshire Boulevard between Beverly Drive and Crescent Drive Next Steps
City Council approval of the final recommended designs for the North Canon Drive closure authorizes Metro to install the roadway changes in conjunction with the sound wall, cul-de-sac, striping changes on Clifton Way, and traffic signal at Clifton Way/North Crescent Drive. Per the feasibility analysis, implementation will also include installation of advanced vehicle detour signage (such as at the intersections of North Canon Drive at North Santa Monica Boulevard and South Santa Monica Boulevard) to alert drivers of the closure and instruct them to take other streets, and an update of existing signal timing to account for shifts in traffic flow. Implementation is anticipated to occur in fall 2018, prior to commencement of major construction activities like piling and decking.
Sound Wall Aesthetics
On March 6, 2018, along with approval to begin the design development phase of the North Canon Drive closure, City Council approved Public Information Graphics concepts for the Wilshire/Rodeo Station (Attachment 5). Since approval of both, City staff has worked with business stakeholders, the Next Beverly Hills committee, and partner agencies to determine a process for applying art work on the north side of the sound wall on North Canon Drive, with the goal of creating an aesthetically pleasing cul-de-sac that fosters a sense of place and identifies North Canon Drive as a destination.
Due to uncertainty of the exact construction timeline for sound wall installation, the project team is working on the following options for covering the wall:
• Develop mural program with the Next Beverly Hills committee Use the wall to showcase past winners of the Beverly Hills Art Show Create a graphic design to incorporate elements of the Winter Bold graphics • Create a graphic associated with the previously approved public information graphics that will be applied to the other sound walls in the Wilshire/Rodeo station area
The design will require funding, which will be brought to the City Council separately for consideration.
Meeting Date: July 24, 2018
• Properties between the alleys to the east and west of North Canon Drive on South Santa Monica Blvd, Brighton Way, Dayton Way, Clifton Way, and Wilshire Blvd
• Properties on Crescent Drive between Dayton Way and Wilshire Boulevard On July 19, 2018, follow-up notices (Attachment 4) were hand delivered to the following properties, announcing that the North Canon Drive Closure would be discussed at the July 24, 2018 City Council Formal Meeting.
• All businesses on North Canon Drive between Wilshire and North Santa Monica Boulevards
• Properties between the alleys to the east and west of North Canon Drive on South Santa Monica Blvd, Brighton Way, Dayton Way, Clifton Way, and Wilshire Blvd
• Properties on Crescent Drive between Dayton Way and Wilshire Boulevard • Businesses on Wilshire Boulevard between Beverly Drive and Crescent Drive Next Steps
City Council approval of the final recommended designs for the North Canon Drive closure authorizes Metro to install the roadway changes in conjunction with the sound wall, cul-de-sac, striping changes on Clifton Way, and traffic signal at Clifton Way/North Crescent Drive. Per the feasibility analysis, implementation will also include installation of advanced vehicle detour signage (such as at the intersections of North Canon Drive at North Santa Monica Boulevard and South Santa Monica Boulevard) to alert drivers of the closure and instruct them to take other streets, and an update of existing signal timing to account for shifts in traffic flow. Implementation is anticipated to occur in fall 2018, prior to commencement of major construction activities like piling and decking.
Sound Wall Aesthetics
On March 6, 2018, along with approval to begin the design development phase of the North Canon Drive closure, City Council approved Public Information Graphics concepts for the Wilshire/Rodeo Station (Attachment 5). Since approval of both, City staff has worked with business stakeholders, the Next Beverly Hills committee, and partner agencies to determine a process for applying art work on the north side of the sound wall on North Canon Drive, with the goal of creating an aesthetically pleasing cul-de-sac that fosters a sense of place and identifies North Canon Drive as a destination.
Due to uncertainty of the exact construction timeline for sound wall installation, the project team is working on the following options for covering the wall:
• Develop mural program with the Next Beverly Hills committee • Use the wall to showcase past winners of the Beverly Hills Art Show • Create a graphic design to incorporate elements of the Winter Bold graphics • Create a graphic associated with the previously approved public information graphics that will be applied to the other sound walls in the Wilshire/Rodeo station area
The design will require funding, which will be brought to the City Council separately for consideration.
Meeting Date: July 24, 2078
ENVIRONMENTAL CONSIDERATIONS
The Final Environmental Impact Report (EIR)/Environmental Impact Statement (EIS) prepared by Metro concluded that there would be significant unavoidable traffic impacts as a result of construction of the Purple Line Extension, including in the vicinity of the Wilshire/Rodeo station. Metro adopted a statement of overriding considerations for the temporary construction impacts and adopted mitigation measures intended to reduce, but that would not eliminate the significant impacts. A decision to proceed with the temporary closure of Canon Drive would be considered an action of the City, as a responsible agency, to implement the mitigation measure as contemplated in the Final EIR/EIS, and although the Fehr & Peers study identifies potentially significant impacts at certain intersections, the potential for these unavoidable impacts were disclosed in Metro’s EIR/EIS. Thus, the impacts were also covered by Metro’s statement of overriding considerations.
After City Council approval of the feasibility analysis on March 6, 2018, the City Council found that it considered the Final EIR/EIS analysis of construction traffic impacts, that the closure and its impacts are covered by Metro’s Final EIR/EIS, and directed staff to file a notice of determination in reliance on the Final EIR. It should be noted that, as a responsible agency, the City does not have to state that Metro’s EIR complies with CEQA, per CEQA Guidelines Section 15096(i). Staff filed the notice of determination with the Los Angeles County Clerk’s office on April 16, 2018 for posting, which commences a 30 day statute of limitations for legal challenges to the approval. The City did not receive any legal challenges during this period, thus the statute of limitations has ended. Council approval of the final recommended roadway designs for North Canon Drive and Clifton Way for the temporary closure of North Canon Drive at Wilshire Boulevard, authorizing the installation of the roadway changes, represents implementation of mitigation measure and feasibility action of the City Council and direction to proceed with the closure and related actions, and is within the scope of the City’s prior environmental determination.
FISCAL IMPACT
The terms of the MOA include provisions to provide reimbursement of costs for all staff and consultants performing work associated with the Third Party Advance Utility Relocation Phase of the Westside Purple Line Extension — Section 2 in Beverly Hills.
The City is currently negotiating the Design-build MOA for the Rodeo Station and Metro has committed to pay for the North Canon Drive improvements as part of the future approval of the MOA.
RECOMMENDATION
That City Council approve the final recommended roadway designs for North Canon Drive and Clifton Way for the temporary closure of North Canon Drive at Wilshire Boulevard, authorizing the installation of the roadway changes.
Susan Healey Keene, AICP
vedBy
Meeting Date: July 24, 2018
ENVIRONMENTAL CONSIDERATIONS
The Final Environmental Impact Report (EIR)/Environmental Impact Statement (EIS) prepared by Metro concluded that there would be significant unavoidable traffic impacts as a result of construction of the Purple Line Extension, including in the vicinity of the Wilshire/Rodeo station. Metro adopted a statement of overriding considerations for the temporary construction impacts and adopted mitigation measures intended to reduce, but that would not eliminate the significant impacts. A decision to proceed with the temporary closure of Canon Drive would be considered an action of the City, as a responsible agency, to implement the mitigation measure as contemplated in the Final EIR/EIS, and although the Fehr & Peers study identifies potentially significant impacts at certain intersections, the potential for these unavoidable impacts were disclosed in Metro's EIR/EIS. Thus, the impacts were also covered by Metro's statement of overriding considerations.
After City Council approval of the feasibility analysis on March 6, 2018, the City Council found that it considered the Final EIR/EIS analysis of construction traffic impacts, that the closure and its impacts are covered by Metro's Final EIR/EIS, and directed staff to file a notice of determination in reliance on the Final El R. It should be noted that, as a responsible agency, the City does not have to state that Metro's EIR complies with CEQA, per CEQA Guidelines Section 15096(i). Staff filed the notice of determination with the Los Angeles County Clerk's office on April 16, 2018 for posting, which commences a 30 day statute of limitations for legal challenges to the approval. The City did not receive any legal challenges during this period, thus the statute of limitations has ended. Council approval of the final recommended roadway designs for North Canon Drive and Clifton Way for the temporary closure of North Canon Drive at Wilshire Boulevard, authorizing the installation of the roadway changes, represents implementation of mitigation measure and feasibility action of the City Council and direction to proceed with the closure and related actions, and is within the scope of the City's prior environmental determination.
FISCAL IMPACT
The terms of the MOA include provisions to provide reimbursement of costs for all staff and consultants performing work associated with the Third Party Advance Utility Relocation Phase of the Westside Purple Line Extension -- Section 2 in Beverly Hills.
The City is currently negotiating the Design-build MOA for the Rodeo Station and Metro has committed to pay for the North Canon Drive improvements as part of the future approval of the MOA.
RECOMMENDATION
That City Council approve the final recommended roadway designs for North Canon Drive and Clifton Way for the temporary closure of North Canon Drive at Wilshire Boulevard, authorizing the installation of the roadway changes.
Susan Healey Keene, AICP
3"
Attachment Attachment 1 1
Potential Closure of N. Canon Drive
During Purple Line Construction
Summary of Transportation
Impact Analysis
Prepared for:
City of Beverly Hills
February 2018
LA17-2772.02
FEHRS’PEERs
Potential Closure of N. Canon Drive
During Purple Line Construction
Summary of Transportation
Impact Analysis
Pre pa red for:
City of Beverly Hills
February 2018
LA17-2772.02
FEHR # PEERS
N. Canon Drive Closure Transportation Impact Summary
A transportation impact analysis (TIA) was prepared for the potential closure of N. Canon Drive at Wilshire Boulevard during construction of the Rodeo Drive Purple Line Station in Beverly Hills. A feasibility analysis was conducted to evaluate potential operational impacts to nearby intersections during peak morning and afternoon commute hours and midday business hours with the potential closure of N. Canon Drive at Wilshire Boulevard.
The potential closure of N. Canon Drive would occur just north of Wilshire Boulevard. Vehicles would no longer be able to access Wilshire Boulevard directly from N. Canon Drive, or access N. Canon Drive directly from Wilshire Boulevard. Instead, vehicles would be rerouted to adjacent roadways, such as N. Beverly Drive and N. Crescent Drive. Local vehicle access to the southern end of N. Canon Drive prior to the closure would be provided on Clifton Way and Dayton Way. The following study intersections were selected for analysis based on the locations most likely to be impacted due to the closure of N. Canon Drive:
1. Brighton Way & N. Beverly Drive
2. Brighton Way & N. Canon Drive
3. Brighton Way & N. Crescent Drive
4. Dayton Way & N. Beverly Drive
5. Dayton Way & N. Canon Drive
6. Dayton Way & N. Crescent Drive
7. Wilshire Boulevard & Beverly Drive
8. Clifton Way & N. Canon Drive
9. Clifton Way & N. Crescent Drive
10. Wilshire Boulevard & Canon Drive
11. Wilshire Boulevard & Crescent Drive12. Wilshire Boulevard & Rexford Drive
13. Charleville Boulevard & S. Reeves Drive
14. Charleville Boulevard & S. Canon Drive15. Charleville Boulevard & S. Crescent Drive The study area and intersections selected for analysis are shown in Figure ES-i.
OVERVIEW
Es-i
N Canon Drive Closure Transportation Impact Summary
OVERVIEW
A transportation impact analysis (TIA) was prepared for the potential closure of N. Canon Drive at Wilshire Boulevard during construction of the Rodeo Drive Purple Line Station in Beverly Hills. A feasibility analysis was conducted to evaluate potential operational impacts to nearby intersections during peak morning and afternoon commute hours and midday business hours with the potential closure of N. Canon Drive at Wilshire Boulevard. The potential closure of N. Canon Drive would occur just north of Wilshire Boulevard. Vehicles would no longer be able to access Wilshire Boulevard directly from N. Canon Drive, or access N. Canon Drive directly from Wilshire Boulevard. Instead, vehicles would be rerouted to adjacent roadways, such as N. Beverly Drive and N. Crescent Drive. Local vehicle access to the southern end of N. Canon Drive prior to the closure would be provided on Clifton Way and Dayton Way. The following study intersections were selected for analysis based on the locations most likely to be impacted due to the closure of N. Canon Drive:
1. Brighton Way & N. Beverly Drive
2. Brighton Way & N. Canon Drive 3. Brighton Way & N. Crescent Drive
4. Dayton Way & N. Beverly Drive
5. Dayton Way & N. Canon Drive
6. Dayton Way & N. Crescent Drive
7. Wilshire Boulevard & Beverly Drive
8. Clifton Way & N. Canon Drive 9. Clifton Way & N. Crescent Drive
10. Wilshire Boulevard & Canon Drive
11. Wilshire Boulevard & Crescent Drive
12. Wilshire Boulevard & Rexford Drive 13. Charleville Boulevard & S. Reeves Drive 14. Charleville Boulevard & S. Canon Drive 15. Charleville Boulevard & S. Crescent Drive The study area and intersections selected for analysis are shown in Figure ES-1.
ES-1
\tpta03\detarJobscbe\Z00sr2772 02_Metro PrpIe Lne Secton 2 Rodeo\Gmophcs\GIStMXD\FX Stu te;socr000 mxd • •
%
SBEDFORDDR
S PECK DR
q1,
S CAMDEN DR
0 SRODEODR
n
I
SELCAMINODR
I
0 0
0 S BEVERLY DR
0 0
SREEVESDR 0
0 S CANON DR 0
N FOOTHILL RD
CRESCENT DR 0
SELMDR
NELMDR
S REXFORD DR
N MAPLE DR
S MAPLE DR
N PALM DR
S PALM DR
Lr) ‘-I
m NOAKHURSTDR
SOAKHURSTDR
I> (t
or
0 h
u
cc
2 r
¥
<C
0 z
cc
0 > t
5 z
cr
0 LAI _,
a
<
3 z
CLIFTON WY
DAYTON WY
0 o
3 t
w
z
€
"use
a"P.@
r
b
0 A
z
0 cc
0 w
z
a. _,
<C
z
cc er: cc
0¢ cr o 0 0r 0
0 0 h cc 0 0r Iu z z a 0 0 u
0 w
w cc 0 w _, > > u 3 0 a - A z tu _, LA <C " r
w <( Al w < 5 8 - cc u cc u w <C
VI u u 0r U u 0 u u
0 0 0 u
A NORTH
0 0
O
o
o
o
0 e
cr
0 cc r 0 cc o 0 or z cc 0 0
0 cr
0 z
w 0 5 2
0 4 0 w <C cc
LL u 0 u LA
0 w 3 0 a l >
w <C cc L Lr
co u u u co
u u
u u CHARLEVILLE BLVD
J
3 55
u
l
,;
)
3 t
0 G
0 ' l_
If}
}
n
r.
¢
er:
0 - cc
2 co
< 0
cr
u
" "C
e
%
Stu
dy
Int
e
r
s
ect
i
o
ns
•
Signali
z
ed
•
St
o
p-co
n
trolled
Fi
gu
re
E
S
-1
St
udy
Area
N. Cation Drive Closure Transportation Impact Summary
ANALYSIS SCENARIOS
The operations of the study locations were analyzed for the following scenarios:
- Existing (2017) Conditions: The analysis of existing conditions was based on traffic counts collected in Fall 2016 and September 2017.
Existing Plus Roadway Closure Conditions: This scenario reflects the potential closure of N.Canon Drive and the rerouting of vehicles based on existing traffic volumes and travel demands. • Mid-Construction (Year 2022) Baseline Conditions: Future traffic projections without the roadway closure were developed for the Year 2022. The objective of this scenario was to forecast future traffic growth and operating conditions that could be expected to result from regional growth and related projects in the vicinity of the project site mid-construction. Year 2022 reflects the time period four years into construction assuming an eight-year construction duration beginning in 2018 and ending in 2026.
• Mid-Construction (Year 2022) PIus Roadway Closure Conditions: This scenario reflects the potential closure of N. Canon Drive and the rerouting of vehicles based on forecasted Year 2022 traffic volumes and travel demands.
The traffic impact analysis was prepared in accordance with the Beverly Hilts Traffic Thresholds of Significance (Planning Commission of the City of Beverly Hills, October 2010).
DOWNTOWN TRIANGLE ACCESS
With the potential closure of N. Canon Drive, vehicles would be rerouted to adjacent roadways, such as Beverly Drive and Crescent Drive. Additional roadway characteristics that factor into the route choices that drivers use when traveling to/from the Golden Triangle are as follows:
- S. Canon Drive is restricted to right-turns only onto Wilshire Boulevard; therefore, vehicles traveling north on S. Canon Drive cannot continue directly into the Golden Triangle on N. Canon Drive. • Dayton Way provides eastbound only travel through the downtown triangle and two-way travel east of N. Crescent Drive.
• Brighton Way provides westbound only travel through the downtown triangle between N.
Crescent Drive and Wilshire Boulevard.
• N. Beverly Drive does not permit vehicles to make a southbound left-turn movement from N.
Beverly Drive onto eastbound Wilshire Boulevard.
ES-3
N. Canon Drive Closure Transportation Impact Summary
ANALYSIS SCENARIOS
The operations of the study locations were analyzed for the following scenarios:
• Existing (2017) Conditions: The analysis of existing conditions was based on traffic counts collected in Fall 2016 and September 2017.
• Existing Plus Roadway Closure Conditions: This scenario reflects the potential closure of N.
Canon Drive and the rerouting of vehicles based on existing traffic volumes and travel demands. • Mid-Construction (Year 2022) Baseline Conditions: Future traffic projections without the roadway closure were developed for the Year 2022. The objective of this scenario was to forecast future traffic growth and operating conditions that could be expected to result from regional growth and related projects in the vicinity of the project site mid-construction. Year 2022 reflects the time period four years into construction assuming an eight-year construction duration beginning in 2018 and ending in 2026.
• Mid-Construction (Year 2022) Plus Roadway Closure Conditions: This scenario reflects the potential closure of N. Canon Drive and the rerouting of vehicles based on forecasted Year 2022 traffic volumes and travel demands.
The traffic impact analysis was prepared in accordance with the Beverly Hills Traffic Thresholds of Significance (Planning Commission of the City of Beverly Hills, October 2010).
DOWNTOWN TRIANGLE ACCESS
With the potential closure of N. Canon Drive, vehicles would be rerouted to adjacent roadways, such as Beverly Drive and Crescent Drive. Additional roadway characteristics that factor into the route choices that drivers use when traveling to/from the Golden Triangle are as follows:
• S. Canon Drive is restricted to right-turns only onto Wilshire Boulevard; therefore, vehicles traveling north on S. Canon Drive cannot continue directly into the Golden Triangle on N. Canon Drive. • Dayton Way provides eastbound only travel through the downtown triangle and two-way travel east of N. Crescent Drive.
• Brighton Way provides westbound only travel through the downtown triangle between N.
Crescent Drive and Wilshire Boulevard.
• N. Beverly Drive does not permit vehicles to make a southbound left-turn movement from N.
Beverly Drive onto eastbound Wilshire Boulevard.
ES-3
N. Canon Drive Closure Transportation Impact Summary
N. CANON DRIVE LOCAL ACCESS
Local vehicle access would continue to be provided on N. Canon Drive south of Clifton Way. The southern end of N. Canon Drivejust prior to Wilshire Boulevard would serve as a cul-de-sac to allow vehicles traveling southbound to make a U-turn and continue northbound on N. Canon Drive. Figure ES-2 displays the onstreet parking, valet operations, and local access driveways along N. Canon Drive in the vicinity of the potential closure.
The following travel patterns were considered in the development of the traffic diversions with the roadway closure. Figure ES-3 displays the potential trip diversions with the N. Canon Drive closure.
Turning Movement Restrictions at N. Canon Drive & Wilshire Boulevard: With the closure of N. Canon Drive just north of Wilshire Boulevard, the following turning movements will no longer be permitted: eastbound left-turn and westbound right-turn from Wilshire Boulevard onto N.
Canon Drive; and southbound left-turn and right-turn from N. Canon Drive onto Wilshire Boulevard.
N. Canon Drive Local Access Needs between Clifton Way and Closure: South of Clifton Way, N.
Canon Drive has on-street metered parking on both sides of the roadway. Several of the parking spaces on the east side of N. Canon Drive operate as valet parking zones for the Spago and Citizen restaurants. Other than the on-street parking spaces and valet zones, no other uses have direct access to/from this block of N. Canon Drive.
• Parking Structure at N. Canon Drive & Clifton Way: The west leg of the intersection of N. Canon Drive & Clifton Way provides direct access to a private parking structure for the building at 9401 Wilshire. With the closure of N. Canon Drive, vehicles would exit the garage onto Clifton Way or make a left-turn onto N. Canon Drive. To enter the garage, vehicles would be routed to N. CrescentDrive to utilize Clifton Way, or travel on N. Beverly Drive to Dayton Way to access N. Canon Drive. • N. Canon Drive Local Access Needs between Clifton Way and Dayton Way: North of Clifton Way, the Montage Beverly Hills Hotel’s motor court is accessed to/from N. Canon Drive. Just north of the hotel, a public parking garage also has direct inbound and outbound access on N. Canon Drive. In addition, N. Canon Drive has on-street metered parking on both sides of the roadway and several of the parking spaces operate as valet parking zones during designated time periods. • N. Canon Drive Access Needs between Dayton Way and S. Santa Monica Boulevard: N. Canon Drive provides access to two parking structures (one public and one private) between Dayton Way and S. Santa Monica Boulevard, and has on-street parking with valet zones during designated times.
I
N. Canon Drive Closure Transportation Impact Summary
N. CANON DRIVE LOCAL ACCESS
Local vehicle access would continue to be provided on N. Canon Drive south of Clifton Way. The southern end of N. Canon Drive just prior to Wilshire Boulevard would serve as a cul-de-sac to allow vehicles traveling southbound to make a U-turn and continue northbound on N. Canon Drive. Figure ES-2 displays the onstreet parking, valet operations, and local access driveways along N. Canon Drive in the vicinity of the potential closure. The following travel patterns were considered in the development of the traffic diversions with the roadway closure. Figure ES-3 displays the potential trip diversions with the N. Canon Drive closure. • Turning Movement Restrictions at N. Canon Drive & Wilshire Boulevard: With the closure of N. Canon Drive just north of Wilshire Boulevard, the following turning movements will no longer be permitted: eastbound left-turn and westbound right-turn from Wilshire Boulevard onto N. Canon Drive; and southbound left-turn and right-turn from N. Canon Drive onto Wilshire Boulevard. • N. Canon Drive Local Access Needs between Clifton Way and Closure: South of Clifton Way, N. Canon Drive has on-street metered parking on both sides of the roadway. Several of the parking spaces on the east side of N. Canon Drive operate as valet parking zones for the Spago and Citizen restaurants. Other than the on-street parking spaces and valet zones, no other uses have direct access to/from this block of N. Canon Drive. • Parking Structure at N. Canon Drive & Clifton Way: The west leg of the intersection of N. Canon Drive & Clifton Way provides direct access to a private parking structure for the building at 9401 Wilshire. With the closure of N. Canon Drive, vehicles would exit the garage onto Clifton Way or make a left-turn onto N. Canon Drive. To enter the garage, vehicles would be routed to N. Crescent Drive to utilize Clifton Way, or travel on N. Beverly Drive to Dayton Way to access N. Canon Drive. • N. Canon Drive Local Access Needs between Clifton Way and Dayton Way: North of Clifton Way, the Montage Beverly Hills Hotel's motor court is accessed to/from N. Canon Drive. Just north of the hotel, a public parking garage also has direct inbound and outbound access on N. Canon Drive. In addition, N. Canon Drive has on-street metered parking on both sides of the roadway and several of the parking spaces operate as valet parking zones during designated time periods. • N. Canon Drive Access Needs between Dayton Way and S. Santa Monica Boulevard: N. Canon Drive provides access to two parking structures (one public and one private) between Dayton Way and S. Santa Monica Boulevard, and has on-street parking with valet zones during designated times.
ES-4
C
0UUa) UIC
-J0
Co
a)
In
CoC
Co
C
0 a)
-Co
>
C a) a)
U,
a?w
pi#jik _gut#fcggtie."SF
• r. •
r, .
Ii '5° I Spa o Valet , • ')!: i.%. _'·w
·ha - {'
·r,
r
mr9,
j['8r."
hic Pan6a le
rance/Eat
f
EEL
Y
ii [. nus _see ee;nu-.r4.ar!pr-=4 1 Wt4zT '= ti, .fgj j.=f '=H zj is '
Ar.gr't@
.t Lt-'
~Ye1') . , i
- jg Ai, '·
...... ..,, ..,.i t @rdi»ry [ flll' � -.:,
gr
yrd .
2'
ii &issued
"eI;
- -tl
0 • • k
t ·,F .
I 7s : 1. : [Eour
$, m"
«t 't
% :i»
i
s
Street Parking
• Metered Parking
e Metered/Valet Parking
» Parking Lot Access
Valet Stand
Figure ES-2
Local Access, On-Street Parking & Valet Operations
U
10 >
>
0 E
a)
2 0
2 2
-c
C
-J
0 U
10 6:
U
Ua)
>a)
L)
a)0
0 0
a)
E
10C
t
C
0 a)
C
•4J
CO
U
>
a)
a)
-o1—
CO
C
-J
0 6:
U
Ua)v
LU
0 C
z
U
C
0 C
U
>
0 0
C
4J
-c
>a)
L)
0)
0)
Q
CO
>
0 0
E
0)
vi
1 C
0 a)
C(0
cx
a)
vi
U
a)
-o
F0
2 0
>
a)
Ea)
C
1i
6:
2 C
2 2
-D \\
—
\———
Ci-)
10 C
-o
>
10 a)
.
,..,
. ' ,
tl ir g·,r, ' I Spago Valet .., Y, ., w . lo
--w 4
eon5ij '
e
0¢
g92'
[y'
I
a3
t
5 ,_
"» Parking Lot Access
Valet Stand
-) Potential Restricted Turn Movements AM (PM) [Mid-Day] Volumes --t Potential Diverted Trips (Local Access Vehicles Would Remain) AM (PM) [Mid-Day) Volumes Figure ES 3
Vehicle Rerouting with Potential N. Canon Drive Closure N. Canon Drive Closure Transportation Impact Summary
MID-CONSiRUCTION TRAFFIC FORECASTS
The mid-construction plus roadway closure condition evaluates the traffic volumes for Year 2022 with the rerouting of vehicles due to the closure of N. Canon Drive. The following sources were utilized to develop the mid-construction traffic forecasts:
Existing traffic counts
Traffic from approved and pending projects in the City of Beverly Hills, City of Los Angeles, and City of West Hollywood
• Ambient growth in existing traffic volumes to reflect growth in regional traffic; a growth rate of one (1) percent per year was applied to reflect this ambient growth
POTENTIAL IMPACTS WITH N, CANON CLOSURE
Impacts to intersection operations, active transportation facilities and transit service with the potential closure of N. Canon Drive are described below:
• Traffic Operations of Study Intersections: The study intersections were analyzed during existing and mid-construction (Year 2022) conditions with the vehicle trip diversions and rerouting due to the potential N. Canon Drive closure. The City of Beverly Hills traffic impact criteria consider the following changes in V/C at signalized intersection or delay at unsignalized to be a significant impact:
Project-Related Increase Project-Related Increase in LOS with Project in V/C Ratio Seconds of Average Total Delay equal to or greater than
4.0 seconds
equal to or greater than
3.0 seconds
Source: City of Beverly HUIs, October 2010.
D
E or F
equal to or greater than
0.030
equal to or greater than
0.020
ES-7
N. Canon Drive Closure Transportation Impact Summary
MID-CONSTRUCTION TRAFFIC FORECASTS
The mid-construction plus roadway closure condition evaluates the traffic volumes for Year 2022 with the rerouting of vehicles due to the closure of N. Canon Drive. The following sources were utilized to develop the mid-construction traffic forecasts:
• Existing traffic counts
• Traffic from approved and pending projects in the City of Beverly Hills, City of Los Angeles, and City of West Hollywood
• Ambient growth in existing traffic volumes to reflect growth in regional traffic; a growth rate of one (1) percent per year was applied to reflect this ambient growth POTENTIAL IMPACTS WITH N. CANON CLOSURE
Impacts to intersection operations, active transportation facilities and transit service with the potential closure of N. Canon Drive are described below:
• Traffic Operations of Study Intersections: The study intersections were analyzed during existing and mid-construction (Year 2022) conditions with the vehicle trip diversions and rerouting due to the potential N. Canon Drive closure. The City of Beverly Hills traffic impact criteria consider the following changes in V/C at signalized intersection or delay at unsignalized to be a significant impact:
LOS with Project
D
E or F
Project-Related Increase
in V/C Ratio
equal to or greater than
0.030
equal to or greater than
0.020
Project-Related Increase in
Seconds of Average Total Delay
equal to or greater than
4.0 seconds
equal to or greater than
3.0 seconds
Source. City of Beverly Hills, October 2010
ES-7
N. Canon Drive Closure Transportation Impact Summary
The following intersections would experience an increase in V/C or delay greater than the thresholds above during one or more analysis periods:
o Wilshire Boulevard & Beverly Drive during the AM peak hour o Wilshire Boulevard & Crescent Drive during the AM and PM peak hourso Clifton Way & N. Crescent Drive during the AM, midday and PM peak hours o Dayton Way & N. Canon Drive during the PM peak hour
Based on the City’s threshold guidelines, the project impact would be potentiatty significant to intersection operations in the vicinity of the N. Canon Drive closure.
The following measures are recommended to improve traffic operations with the N. Canon Drive closure:
o Provide Advanced Vehicle Detour Sinage: The impact analysis assumes that the majority of vehicles currently utilizing N. Canon Drive will shift to the closest nearby intersections, such as N. Beverly Drive and N. Crescent Drive. While these intersections are expected to experience an increase in vehicle delay with the N. Canon Drive closure, drivers have multiple access options to/from the Downtown Triangle. Therefore, drivers are likely to select alternate routes further to the east and west to avoid overly congested locations. o Update Traffic Signal Timings: Traffic signal timings should be modified along N. Canon Drive and on the parallel roadways of N. Beverly Drive and N. Crescent Drive to accommodate the shift in vehicle flows with the N. Canon Drive closure and provide additional green time to the heaviest turning movements. o Signalization of Clifton Way & N. Crescent Drive Intersection: With the closure of N. Canon Drive at Wilshire Boulevard, vehicles will shift to N. Crescent Drive. This will result in traffic volume increases along N. Crescent Drive and also at the intersection of Clifton Way & N.
Crescent Drive as vehicles utilize Clifton Way to access local uses along the southern portion of N. Canon Drive. With the additional traffic volumes with the potential closure, the increase in vehicle delay will result in a significant impact based on City thresholds, and the increase in traffic volumes will also result in the intersection meeting the peak hour traffic volume warrant for the installation of a traffic signal. The installation of a traffic signal would result in LOS C or better operations during peak travel hours.
Bicycle Facilities & Access: The potential closure may restrict direct bicycle access between N.Canon Drive and Wilshire Boulevard, depending on the ultimate design of the cul-de-sac. While bicyclists would have the ability to walk their bikes utilizing the pedestrian pathway, they may not Es-s
N. Canon Drive Closure Transportation Impact Summary
The following intersections would experience an increase in V/C or delay greater than the thresholds above during one or more analysis periods:
o Wilshire Boulevard & Beverly Drive during the AM peak hour o Wilshire Boulevard & Crescent Drive during the AM and PM peak hours o Clifton Way & N. Crescent Drive during the AM, midday and PM peak hours o Dayton Way & N. Canon Drive during the PM peak hour Based on the City's threshold guidelines, the project impact would be potentially significant to intersection operations in the vicinity of the N. Canon Drive closure.
The following measures are recommended to improve traffic operations with the N. Canon Drive closure:
o Provide Advanced Vehicle Detour Signage: The impact analysis assumes that the majority of vehicles currently utilizing N. Canon Drive will shift to the closest nearby intersections, such as N. Beverly Drive and N. Crescent Drive. While these intersections are expected to experience an increase in vehicle delay with the N. Canon Drive closure, drivers have multiple access options to/from the Downtown Triangle. Therefore, drivers are likely to select alternate routes further to the east and west to avoid overly congested locations. o Update Traffic Signal Timings: Traffic signal timings should be modified along N. Canon Drive and on the parallel roadways of N. Beverly Drive and N. Crescent Drive to accommodate the shift in vehicle flows with the N. Canon Drive closure and provide additional green time to the heaviest turning movements. o Signalization of Clifton Way &N Crescent Drive Intersection: With the closure of N. Canon Drive at Wilshire Boulevard, vehicles will shift to N. Crescent Drive. This will result in traffic volume increases along N. Crescent Drive and also at the intersection of Clifton Way & N.
Crescent Drive as vehicles utilize Clifton Way to access local uses along the southern portion of N. Canon Drive. With the additional traffic volumes with the potential closure, the increase in vehicle delay will result in a significant impact based on City thresholds, and the increase in traffic volumes will also result in the intersection meeting the peak hour traffic volume warrant for the installation of a traffic signal. The installation of a traffic signal would result in LOS C or better operations during peak travel hours. • Bicycle Facilities & Access: The potential closure may restrict direct bicycle access between N.
Canon Drive and Wilshire Boulevard, depending on the ultimate design of the cul-de-sac. While bicyclists would have the ability to walk their bikes utilizing the pedestrian pathway, they may not ES-8
0 N. Canon Drive Closure Transportation Impact Summary
I
be able to ride between the two roadways with the closure. As part of the data collection effort, bicyclists were counted during peak hours. The volumes indicate a fairly low bicycle demand between N. Canon Drive and Wilshire Boulevard with approximately 5 bicyclists traveling from N.
Canon Drive onto Wilshire Boulevard, or from Wilshire Boulevard onto N. Canon Drive in both the AM and midday peak hours (no bicyclists were observed during the PM peak hour). The City is beginning the process of preparing a Complete Streets Plan that will provide guidance on new active transportation facilities throughout the City. At this time, no additional bicycle facilities are planned adjacent to the project site. Therefore, the project impact is tess than significant and nomitigation is required.
Pedestrian Facilities & Access: The closure of N. Canon Drive would maintain pedestrian accessbetween Wilshire Boulevard and N. Canon Drive. At the stop controlled intersection of N. Canon Drive and Clifton Way, high visibility continental crosswalks along with additional pedestrian crossing signage are planned by the City and are expected to be implemented within the next few months. These pedestrian enhancements will benefit those walking along N. Canon Drive. There are no additional planned pedestrian facilities in the vicinity of the roadway closure. Therefore, the project impact is tess than significant and no mitigation is required.
Transit Service: Several transit lines operate within the study area with service provided by Metro.
Metro has already made minor route adjustments to Line 14/37 in conjunction with the advanced utility work being conducted for the Metro Purple Line construction project and the intermittent closure of the eastbound left-turn lane from Wilshire Boulevard onto N. Canon Drive. In addition, Metro relocated several bus stops in the area due to on-going construction activities on Wilshire Boulevard in January 2018. The bus stops were relocated outside of the Metro Purple Line construction zone with the new eastern bus stops on Wilshire Boulevard between Rexford Drive and Crescent Drive and the new western bus stops on Wilshire Boulevard between Camden Drive and Rodeo Drive. The closure of N. Canon Drive would not result in any additional changes to bus service routes or stop locations. Therefore, the project impact is less than significant and no mitigation is required.
ENVIROMENTAL CONSIDERATIONS
The Final EIR/EIS prepared by Metro concluded that there would be significant unavoidable traffic impacts as a result of construction of the Purple Line Extension, including in the vicinity of the Wilshire/Rodeostation. The potential closure, including the results of the feasibility study, is consistent with the conclusions and mitigations identified in Metro’s Final EIR/EIS, which found significant unavoidable traffic impacts prm
N. Canon Drive Closure Transportation Impact Summary
be able to ride between the two roadways with the closure. As part of the data collection effort, bicyclists were counted during peak hours. The volumes indicate a fairly low bicycle demand between N. Canon Drive and Wilshire Boulevard with approximately 5 bicyclists traveling from N.
Canon Drive onto Wilshire Boulevard, or from Wilshire Boulevard onto N. Canon Drive in both the AM and midday peak hours (no bicyclists were observed during the PM peak hour). The City is beginning the process of preparing a Complete Streets Plan that will provide guidance on new active transportation facilities throughout the City. At this time, no additional bicycle facilities are planned adjacent to the project site. Therefore, the project impact is less than significant and no mitigation is required. • Pedestrian Facilities & Access: The closure of N. Canon Drive would maintain pedestrian access between Wilshire Boulevard and N. Canon Drive. At the stop controlled intersection of N. Canon Drive and Clifton Way, high visibility continental crosswalks along with additional pedestrian crossing signage are planned by the City and are expected to be implemented within the next few months. These pedestrian enhancements will benefit those walking along N. Canon Drive. There are no additional planned pedestrian facilities in the vicinity of the roadway closure. Therefore, the project impact is less than significant and no mitigation is required.
Transit Service: Several transit lines operate within the study area with service provided by Metro.
Metro has already made minor route adjustments to Line 14/37 in conjunction with the advanced utility work being conducted for the Metro Purple Line construction project and the intermittent closure of the eastbound left-turn lane from Wilshire Boulevard onto N. Canon Drive. In addition, Metro relocated several bus stops in the area due to on-going construction activities on Wilshire Boulevard in January 2018. The bus stops were relocated outside of the Metro Purple Line construction zone with the new eastern bus stops on Wilshire Boulevard between Rexford Drive and Crescent Drive and the new western bus stops on Wilshire Boulevard between Camden Drive and Rodeo Drive. The closure of N. Canon Drive would not result in any additional changes to bus service routes or stop locations. Therefore, the project impact is less than significant and no mitigation is required.
ENVIROMENTAL CONSIDERATIONS
The Final EIR/EIS prepared by Metro concluded that there would be significant unavoidable traffic impacts as a result of construction of the Purple Line Extension, including in the vicinity of the Wilshire/Rodeo station. The potential closure, including the results of the feasibility study, is consistent with the conclusions and mitigations identified in Metro's Final EIR/EIS, which found significant unavoidable traffic impacts ES-9
N. Canon Drive Ctosure Transportation Impact Summary
resulting from construction in the areas of the intersections of Wilshire Boulevard & Beverly Drive and Wilshire Boulevard & Canon Drive. The EIR/EIS includes mitigation measures ICON-i for preparation of Traffic Control Plans and TCON-4 for Transportation Management Plans to help address the significant and unavoidable traffic impacts caused by construction activities. Specifically, TCON-1 contemplates that trafficcontrol plans developed in close coordination with local agencies, which will have various features including, but not limited to, temporary street closures, detour routes, and temporary traffic signals. Further, TCON 4 contemplates transportation management plans that could include the N. Canon Drive Closure.
Metro adopted a statement of overriding considerations for the temporary construction impacts. A decision to proceed with the temporary closure of N. Canon Drive would be considered an action of the City, as a responsible agency, to implement the mitigation measure as contemplated in the Final EIR/EIS. Although the transportation feasibility study identifies potentially significant impacts at certain intersections, the potential for these unavoidable impacts were disclosed in Metro’s EIR/EIS. Thus, the impacts were also covered by Metro’s statement of overriding considerations. Should the City decide to proceed with the N.
Canon Drive closure, the Council should also find that it considered the Final EIR/EIS analysis of construction traffic impacts, that the closure and its impacts are covered by Metro’s Final EIR/EIS, and direct staff to file a notice of determination in reliance on the Final EIR. It should be noted that, as a responsible agency, the City would not have to state that Metro’s EIR complies with CEQA, per CEQA Guidelines Section 15096(i).
ES-10
0)
N Canon Drive Closure Transportation Impact Summary
resulting from construction in the areas of the intersections of Wilshire Boulevard & Beverly Drive and Wilshire Boulevard & Canon Drive. The EIR/EIS includes mitigation measures TCON-1 for preparation of Traffic Control Plans and TCON-4 for Transportation Management Plans to help address the significant and unavoidable traffic impacts caused by construction activities. Specifically, TCON-1 contemplates that traffic control plans developed in close coordination with local agencies, which will have various features including, but not limited to, temporary street closures, detour routes, and temporary traffic signals. Further, TCON4 contemplates transportation management plans that could include the N. Canon Drive Closure.
Metro adopted a statement of overriding considerations for the temporary construction impacts. A decision to proceed with the temporary closure of N. Canon Drive would be considered an action of the City, as a responsible agency, to implement the mitigation measure as contemplated in the Final EIR/EIS. Although the transportation feasibility study identifies potentially significant impacts at certain intersections, the potential for these unavoidable impacts were disclosed in Metro's EIR/EIS. Thus, the impacts were also covered by Metro's statement of overriding considerations. Should the City decide to proceed with the N.
Canon Drive closure, the Council should also find that it considered the Final EIR/EIS analysis of construction traffic impacts, that the closure and its impacts are covered by Metro's Final EIR/EIS, and direct staff to file a notice of determination in reliance on the Final EIR. It should be noted that, as a responsible agency, the City would not have to state that Metro's EIR complies with CEQA, per CEQA Guidelines Section 15096(i).
ES-10
Attachment Attachment 22
CURRENT PARKING RESTRICTIONS LEGEND
ALL CURRSNTLS DPERATIND PARK’ND METERS DPEEATE AS 1 HR Sal,] Rpm MDN SAT. 3 HR Rpm Rpm MDN SAT. AND 3 HR ‘2pm Rpm RUN
UNLESS OTHERWISE NDTED AS EDLLDWS
a, VALET PAREIND DNLY 11:33am 2pm & Rpm 2am TUE TAT AND Rpm Sam SUN MDN.
VALET PARKING ONLY Tiam 4pm &Rpm Uam TUE SAT AND 6pm 2am SUN MDN a. VALET PARK,ND ONLI 11am Sam TOES EAT, AND Rpm 2am SUN MDN.
V.VA..E’ PARK NC DNLS 2pm 3pm MDN ER! 6pm 12am MON SA AND iTa’’ 3pm SUN. a 24 MiNUTE PARKING Var Rpm MON RAT
a’
4••j3 W--—
Ii’
t A A
£ £ S .1
N. CANON DRIVE:
20 SHIFT THE EXISTING 7 METERED/VALET PARKING SPACES
TO THE NORTH AND MAINTAIN EXISTING VALET METRO PURPLE LINE PARKING TIME PERIODS. METERS WILL NEED TO BE T5I0N SOUNOWALL —o
RELOCATED TO ALIGN WITH NEW PARKING LOCATIONS,
C
— -a—
JR (ZJ. -I “Li
LEGEND
e
e
e
e
0 RS 2 RELOCATE 20 MINUTE METERED
I - PARKING SPACE ON EAST SIDE OF N
L CANON DRIVE TO WEST SIDE ADJACENT
TO EXISTING 20 MINUTE METERS.
D’ W14-2
PARKIND METER TO RE TEMPDRATILS REMOVED
PARKING METER TO REMAIN
PARKING METER TO RE TEMPORARILT INSTALLED
PARKING l.IETLP TO BE TETUPDRARILT RELOCATED
UICIVEARLE PLANTER RUBE INSTALLED
EIRK HSDRRNI
Pt’
4Th
r
r ‘
V CONSTRUCTION ‘
DRIVEWAR AREA
N.T.S.
IEEE I’’
N Canon Drive ConCeptual Design
N Canon Drive Closure at Wilshire Boulevard
Beverly Hills, CA CONCET”UAL NOT FOR CONSTRUCT.0N
DFTAIsED ANALySIs AND ENGINCCR:ND DFSIuN RFOUIRLD
♦
♦
♦
%
♦
t.
R5-2
L
' W142
SHIFT THE EXISTING 7 METERED/VALET PARKING SPACES
TO THE NORTH AND MAINTAIN EXISTING VALET
PARKING TIME PERIODS. METERS WILL NEED TO BE
RELOCATED TO ALIGN WITH NEW PARKING LOCATIONS
" } e
RELOCATE 20 MINUTE METERED
PARKING SPACE ON EAST SIDE OF N.
CANON DRIVE TO WEST SIDE ADJACENT
TO EXISTING 20 MINUTE METERS.
METRO PURPLE LINE
EXTENSION SOUNDWALL
N.TS
LEGEND
« PARKING METER TO BE TEMPORARILY REMOVED
« PARKNG METER TO REMAIN
<> PARKING METER TO BE TEMPORARILY INSTALLED
<» PARKING METEF TO BE TEMPORARILY RELOCATED
MOVEABLE PLANTIER TIO BE INSTALLED
+C+ FIRE HYDRANT
CONCEPTUAL NOT FOR CONSTRUCTION
DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED
CURRENT PARKING RESTRICTIONS LEGEND
ALL CURRENTLY OPERATING PARKING METERS OPERATE AS 1 HR 8am 6pm MON SAT 3 HR 6pm 9pm MON SAT, AND 3 HR 12pm 6pm SUN UNLESS OTHERWISE NOTED AS FOLLOWS.
a. VALET PARKING ONLY 11.30am 2pm & 6pm 2am TUE SAI, AND 6pm 2am SUN MON. b. VALET PARKING ONLY 11am 4pm & 6pm 2am TUE SAT AND 6pm 2am SUN MON c. VALET PARKING ONLY 11am 2am TUES SAI, AND 5pm 2am SUN MON d. VALET PARKING ONLY 12pm 3pm MON FRI 6pm 12am MON SAT AND 11am 3pm SUN. e 20 MINUTE PARKING 8am 9pm MON SAT
N Canon Drive Conceptual Design
N Canon Drive Closure at Wilshire Boulevard
Beverly Hills, CA
ALLEYWAY
SHIFT YELLOW CENTERLINE ON CLIFTONWAY 2 FEET TO THE SOUTH TO PROVIDE
WIDER TRAVEL LANE NEXT TO ON-STREET
PARKING AND LOADING ZONE.
PARKING METER TO BE TEMPORARILY INSTALLEDPARKING METER TO BE TEMPORAR LT RE OCAEED z% !.
RE
TEMPORARILY REMOVE 4 PARKING
SPACES FOR ENHANCED TRAFFIC
FLOW APPROACHING NEW
SIGNALIZED INTERSECTION.
ALLEYWAY
N 1.5
LOADING ZONE REMAINS
+
+
TEMPORARILY REMOVE PARKING METER
CLOSEST TO N. CANON DRIVE FOR
ENHANCED TRAFFIC FLOW FOR VEHICLES
APPROACHING INTERSECTION.
-15
ii .it
TEMPORARILY REMOVE 4 PARKING
SPACES FOR ENHANCED VISIBILITY
AND TRAFFIC FLOW FOR VEHICLES
EXITING THE ALLEYWAY.
+
c c
;-
-
( -Iw— I’ C) C)ZI
-
e . e V
LEGEND
PARKING METER TOTE TEMPORARILY REMOVED
PARKING METER TO PEMAIN
co Clifton Way Conceptual Design___
N Canon Drive Closure at Wilshire Boulevard
CONCEPTUAL NOT Beverly Hills, CA FOR (ONSTRUCOONDETAILED ANALYS S AND ENGINEER NG DESI N REQUIRED NTS
° e
Clifton Way Conceptual Design
N Canon Drive Closure at Wilshire Boulevard
Beverly Hills, CA
TEMPORARILY REMOVE 4 PARKING
SPACES FOR ENHANCED VISIBILITY
AND TRAFFIC FLOW FOR VEHICLES
EXITING THE ALLEYWAY.
ALLEYWAY
TEMPORARILY REMOVE 4 PARKING
SPACES FOR ENHANCED TRAFFIC
FLOW APPROACHING NEW
SIGNALIZED INTERSECTION. ¢
ALLEYWAY
LOADING ZONE REMAINS
LEGEND
< PARKING MEIER IO BE TEMPORARILY REMOVED « PARKING METER IO REMAIN <@> PARKING METER IO BE TEMPORARILY INSTALLED
<p» PARKING}METER IO BE TEMPORARILY RELOCATED
CONCEPTUAL NOT FOR CONSTRUCTION DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED
SHIFT YELLOW CENTERLINE ON CLIFTON
WAY 2 FEET TO THE SOUTH TO PROVIDE
WIDER TRAVEL LANE NEXT TO ON-STREET
PARKING AND LOADING ZONE.
TEMPORARILY REMOVE PARKING METER
CLOSEST TO N. CANON DRIVE FOR
ENHANCED TRAFFIC FLOW FOR VEHICLES
APPROACHING INTERSECTION.
E 4 z
r r L =
I
Ea E
Attachment Attachment 33
I,
________
t
j
o4
CONCEPTUAL PLAN
OPTION -1
N. CANON DRIVE CLOSURE
PSOMAS
ALLEY °
V
<
/
/
/
eTtR VALET
£Roe3ED
VAT LA«E CACITY
ANG STALLS $
PARKING SUMMARY
.f
ALLEY
-..Fl l
Zee±
i
t 4 t
r4.
t
ut
N. CANON DRIVE
r
C
AVM NOJJIYO
zU
I->
-Jo
..JZD
ZNW0
z
U
Z
c
CONSTRUCTION STAGNO
;
I
I
I
ALLEY
-
r
Terese5
t t
gt
t
N. CANON DRIVE
7 PARKING SUMMARY CONCEPTUAL PLAN
j] ;A [2.... OPTION-2
] 'a} low ow N. CANON DRIVE CLOSURE
j - ze4.t .4 . ?s·isl !L--------------------== =====---------- - --- ==· .. �"·w • • In->
_ZD
zc,wu
-
zU
Z
00 z
U
fN
/ / N
/
/
A
/
l
ALLEY
_rs==
I
11 -,_ ·
____s- '---..... __
.,_
..
_._
---..l
· I -
'--- ----....:........ · __
'-=-------..:........J�'---=--=---==---/
/
//'/ ••
. en. '-,
4A4if
;
t t
4 i
l
I
t
,.,
N. CANON DRIVE
I
'
C
PARKING SUMMARY
WE TU'J VNET
0Posso
VA£TLAe .$ CAPACITY
PG $74LS
CONCEPTUAL PLAN
OPTION - 3
N. CANON DRIVE CLOSURE
PSOMAS
zz l
Attachment Attachment 44
4 METRO PROJECT NOTICE Of UPCOMING MEETINGS
July 11 — Monthly Community Outreach Meeting, Section 1 and 2 • City Hall, Municipal Gallery, 6:30 PM flight refreshments served) July 12 — Section 2, North Canon Drive Closure to Traffic and Parking Commission • City Hall, Council Chambers, 9 AM
July 17 — Section 2, Memorandum of Agreement to City Council for Introduction (no action to be taken)
• City Hall, Council Chambers, 7 PM
July 24 — Section 2, North Canon Drive Closure to City Council for Consideration • City Hall, Council Chambers, 7 PM
August 1 — Monthly Community Outreach Meeting, Section 1 and 2 • City Hall, Municipal Gallery, 6:30 PM (light refreshments served) August 21 — Memorandum of Agreement to City Council for Consideration, Section 2 • City Hall, Council Chambers, 7 PM
For more information on any of these meetings or the Metro Purple Line Extension Prolect, visit www.beverlyhills.org/purpleline, email [email protected] or call us at 310.285.2467. 2 5
Jo
1 8 9
15 16
22 23
6 7
1$
13 1 20
14 21
25 26 27 28
29 30 31
2 5
12 19
26 6
13 20
27 7
14 28
8 15
22 29
3 10
17 24
31 9
16 23
30 11
18 25
l
JULY
S I0 5 s
1 2 6 7
8 9 13 14
15 16 20 21
22 23 27 28
29 30 31
I AUGUST
s a m 2 m [3 $
2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 22 23 24 25
26 27 28 29 30 31
METRO PROJECT NOTICE OF UPCOMING MEETINGS
July 11 - Monthly Community Outreach Meeting, Section 1 and 2 • City Hall, Municipal Gallery, 6:30 PM (light refreshments served) July 12 - Section 2, North Canon Drive Closure to Traffic and Parking Commission • City Hall, Council Chambers, 9 AM
July 17 - Section 2, Memorandum of Agreement to City Council for Introduction (no action to be taken)
• City Hall, Council Chambers, 7 PM
July 24 - Section 2, North Canon Drive Closure to City Council for Consideration • City Hall, Council Chambers, 7 PM
August 1 - Monthly Community Outreach Meeting, Section l and 2 • City Hall, Municipal Gallery, 6:30 PM (light refreshments served) August 21 -Memorandum of Agreement to City Council for Consideration, Section 2 • City Hall, Council Chambers, 7 PM
For more information on any of these meetings or the Metro Purple Line Extension Project, visit www.beverlyhills.org/purpleline, email [email protected] or call us at 310.285.2467.
II
S
—t&S
Nc’
CITY OF BEVERLY HILLS
Department of Public Works
345 Foothill Road
Beverly Hills, CA 90210
CITY OF
BEVERLY HILLS
METRO PURPLE
LINE EXTENSION
Presorted
Standard
U.S. Postage
PAID
Los Angeles, CA
Permit #3328
NOTICE OF PUBLIC MEETING
100 block of North Canon Drive at Wilshire Boulevard
Recommended Roadway Designs for Temporary Cul-de-Sac Closure Metro Rodeo Station Construction
The Community Development Department invites your participation in the review of designs to mitigate traffic impacts during the Metro Rodeo Station construction. The Rodeo Station work zone will span Wilshire Boulevard between El Camino and Elm Drives and includes periodic lane closures throughout the life of the project (2026).
‘‘
MEETING: Traffic & Parking Commission
DATE: Thursday, July 12, 2018
TIME: 9:00 a.m., or as soon thereafter as the matter may be heard
LOCATION City Hall Council Chambers, 455 N Rexford Drive -% Beverly Hills CA 90210 wisreauiavari
PROPOSAL: The Traffic & Parking Commission will provide input that will be forwarded to City Council for review and action on the following recommended roadway designs for the temporary closure of North Canon Drive at Wilshire Boulevard to create a cul-de-sac and sound wall on the north side of the street:
(1) Convert North Canon Drive between Clifton Way and Wilshire Boulevard to one southbound lane to allow for vehicles turning around the cul-de-sac (2) Temporarily remove nine parking stalls on Clifton Way between North Canon Drive and North Crescent Drive (one on the north side and eight on the south side) to improve traffic flow
Persons wishing to comment on this item are invited to attend the July 12, 2018 Traffic & Parking Commission meeting and/or submit written comments. Please submit correspondence a minimum of 24-hours in advance of the meeting date to allow for routing. Any communication received by the City becomes part of the public record.
Email: transportation @ beverlyhills. org
Mail: City of Beverly Hills
Community Development -Transportation Planning
455 North Rexford Drive, Beverly Hills, CA 90210
The Traffic & Parking Commission is an advisory board to the City Council. The Commission’s input will be forwarded to the City Council for consideration on July 24, 2018 at 2:30 pm at City Hall in Council Chambers. The City Council may approve, deny, or modify the designs based on the Commission’s feedback.
The meeting agenda and staff report will be available online at www.beverlyhills.org/tpcagendas by July 6, 2018. If you would like additional information regarding these recommendations, please contact the Transportation Planning Division at (310) 285-1128.
Please note: If you are unable to attend the Traffic & Parking Commission meeting, an evening Metro community meeting is scheduled on Wednesday, July 77, 2078, at City Hall in the Municipal Gallery starting at 6:30 p.m. For additional information, please call (370) 285-2467. in accordance with the Americans with Disabilities Act, Room 280-A is wheelchair accessible and is equipped with audio equipment for the hearing impaired. if you need special assistance to attend this meeting, please call the Transportation Planning Division at (310) 285-1 128 or TTY (310) 285-6881 Please notify the Transportation Planning Division at least forty-eight (48) hours prior to the meeting if you require captioning service so that reasonable arrangements can be made.
Date Delivered: 07/06/2018
...z::... w
Recommended Roadway Designs for Temporary Cul-de-Sac Closure Metro Rodeo Station Construction
Traffic & Parking Commission Thursday, July 12, 2018
9:00 a.m., or as soon thereafter as the matter may be heard City Hall, Council Chambers, 455 N. Rexford Drive
Beverly Hills, CA 90210
MEETING: DATE:
TIME:
The Community Development Department invites your participation in the review of designs to mitigate traffic impacts during the Metro Rodeo Station construction. The Rodeo Station work zone will span Wilshire Boulevard between El Camino and Elm Drives and includes periodic lane closures throughout the life of the project (2026). LOCATION:
PROPOSAL: The Traffic & Parking Commission will provide input that will be forwarded to City Council for review and action on the following recommended roadway designs for the temporary closure of North Canon Drive at Wilshire Boulevard to create a cul-de-sac and sound wall on the north side of the street:
(1) Convert North Canon Drive between Clifton Way and Wilshire Boulevard to one southbound lane to allow for vehicles turning around the cul-de-sac (2) Temporarily remove nine parking stalls on Clifton Way between North Canon Drive and North Crescent Drive (one on the north side and eight on the south side) to improve traffic flow
Persons wishing to comment on this item are invited to attend the July 12, 2018 Traffic & Parking Commission meeting and/or submit written comments. Please submit correspondence a minimum of 24-hours in advance of the meeting date to allow for routing. Any communication received by the City becomes part of the public record.
Email:
Mail:
[email protected]
City of Beverly Hills
Community Development - Transportation Planning
455 North Rexford Drive, Beverly Hills, CA 90210
The Traffic & Parking Commission is an advisory board to the City Council. The Commission's input will be forwarded to the City Council for consideration on July 24, 2018 at 2:30 pm at City Hall in Council Chambers. The City Council may approve, deny, or modify the designs based on the Commission's feedback.
The meeting agenda and staff report will be available online at www.beverlyhills.org/tpcagendas by July 6, 2018. If you would like additional information regarding these recommendations, please contact the Transportation Planning Division at (310) 285-1128.
Please note: If you are unable to attend the Traffic & Parking Commission meeting, an evening Metro community meeting is scheduled on Wednesday, July 11, 2018, at City Hall in the Municipal Gallery starting at 6:30 p.m. For additional information, please call (310) 285-2467.
In accordance with the Americans with Disabilities Act, Room 280-A is wheelchair accessible and is equipped with audio equipment for the hearing impaired. If you need special assistance to attend this meeting, please call the Transportation Planning Division at (310) 285-1128 or TTY (310) 285-6881. Please notify the Transportation Planning Division at least forty-eight (48) hours prior to the meeting if you require captioning service so that reasonable arrangements can be made. Date Delivered: 07/06/2018
NOTICE OF PUBLIC MEETING
100 block of North Canon Drive at Wilshire Boulevard
Recommended Roadway Designs for Temporary Cul-de-Sac Closure Metro Purple Line Wilshire/Rodeo Station Construction
City Council Formal Meeting
Tuesday, July 24, 2018
City Hall, Council Chambers
455 N. Rexford Drive
Beverly Hills, CA 90210
(1) Construct a sound wall to create a cul-de-sac
(2) Convert North Canon Drive between Clifton Way and Wilshire Boulevard to one southbound lane to allow for vehicles turning around the cul-de-sac (3) Temporarily remove nine parking stalls on Clifton Way between North Canon Drive and North Crescent Drive (one on the north side and eight on the south side) to improve traffic flow
At the July 12, 2018 Traffic & Parking Commission meeting, the Commission reviewed the recommended designs and provided input that was forwarded to the City Council for consideration.
Persons wishing to comment on this item are invited to attend the July 24, 2018 City Council FormalMeeting and/or submit written comments. Please submit correspondence a minimum of 24-hours in advance of the meeting date to allow for routing. Any communication received by the City becomes part of the public record.
Email: transportation @beverlyhills. org
Mail: City of Beverly Hills
Community Development -Transportation Planning
455 North Rexford Drive, Beverly Hills, CA 90210
The Traftic & Parking Commission is an advisory board to the City Council. The City Council may approve, deny, or modify the designs based on the Commission’s feedback. If you would likeadditional information regarding these recommendations, please contact the Transportation Planning Division at (310) 285-1128.
MEETING:DATE:
TIME:
LOCATION:
PROPOSAL:
The Community Development Department invites your participation in the review of designs to mitigate traffic impacts during the Metro Purple Line Wilshire/Rodeo station construction. The Rodeo Station work zone will span Wilshire Boulevard between El Camino and Elm Drives and includesperiodic lane closures throughout the life of the project (2026). -
4. F “ 7:00 p.m., or as soon thereafter as the matter may be ( i ‘%...•. heard r I
WIshh. BouI.vird
Pending public comment, the City Council will review and take action on the following recommended roadway designs for the temporary (at least two years) closure ofNorth Canon Drive at Wilshire Boulevard:
In accordance with the Americans with Disabilities Act, Room 280-A is wheelchair accessible and is equipped with audio equipment for the hearing impaired. If you need special assistance to attend this meeting, please call the Transportation Planning Division at (310) 285-1 128 or TTY (310) 285-6881. Please notify the Transportation Planning Division at least forty-eight (48) hours prior to the meeting if you require captioning service so that reasonable arrangements can be made.
Date Delivered: 07/19/2018
..::::.....
Recommended Roadway Designs for Temporary Cul-de-Sac Closure Metro Purple Line Wilshire/Rodeo Station Construction
TIME:
DATE:
MEETING: City Council Formal Meeting
Tuesday, July 24, 2018
7:00 p.m., or as soon thereafter as the matter may be
heard
City Hall, Council Chambers
455 N. Rexford Drive
Beverly Hills, CA 90210
PROPOSAL: Pending public comment, the City Council will review and take action on the following recommended roadway designs for the temporary (at least two years) closure of North Canon Drive at Wilshire Boulevard:
The Community Development Department invites your participation in the review of designs to mitigate traffic impacts during the Metro Purple Line Wilshire/Rodeo station construction. The Rodeo Station work zone will span Wilshire Boulevard between El Camino and Elm Drives and includes periodic lane closures throughout the life of the project (2026).
LOCATION:
(1) Construct a sound wall to create a cul-de-sac
(2) Convert North Canon Drive between Clifton Way and Wilshire Boulevard to one southbound lane to allow for vehicles turning around the cul-de-sac (3) Temporarily remove nine parking stalls on Clifton Way between North Canon Drive and North Crescent Drive (one on the north side and eight on the south side) to improve traffic flow
At the July 12, 2018 Traffic & Parking Commission meeting, the Commission reviewed the recommended designs and provided input that was forwarded to the City Council for consideration. Persons wishing to comment on this item are invited to attend the July 24, 2018 City Council Formal Meeting and/or submit written comments. Please submit correspondence a minimum of 24-hours in advance of the meeting date to allow for routing. Any communication received by the City becomes part of the public record. Email:
Mail:
transportation @beverlyhills.org
City of Beverly Hills
Community Development - Transportation Planning
455 North Rexford Drive, Beverly Hills, CA 90210
The Traffic & Parking Commission is an advisory board to the City Council. The City Council may approve, deny, or modify the designs based on the Commission's feedback. If you would like additional information regarding these recommendations, please contact the Transportation Planning Division at (310) 285-1128.
In accordance with the Americans with Disabilities Act, Room 280-A is wheelchair accessible and is equipped with audio equipment for the hearing impaired. If you need special assistance to attend this meeting, please call the Transportation Planning Division at (310) 285-1128 or TTY (310) 285-6881. Please notify the Transportation Planning Division at least forty-eight (48) hours prior to the meeting if you require captioning service so that reasonable arrangements can be made. Date Delivered: 07/19/2018 Attachment Attachment 55
Public Information Graphics Program
Bank of
America
Financial Center
Sound Wall
!! j
Pedestrian Barrier Automotive Barrier
, SoulCycle
OPEN
3 7
2 SoulCycle
Detour
Temporary light pole boxes Wayfinding
Public Information Graphics Program
Sound Wall
Pedestrian Barrier Automotive Barrier
Wayfinding
SoulCycle
OPEN
Bank of
America
Financial Center
◄ Detour
«>
► 9
3 7
2 Temporary light pole boxes
Attachment 2
BEVERLYRLY
STAFF REPORT
Meeting Date: September 21 , 2021
To: Honorable Mayor & City Council
From: Daren Grilley, City Engineer
Robert Welch, Engineering Manager
Christine Chung, Associate Project Manager
Subject: North Cañon Drive Closure Extension Consideration Attachments: 1. July 24, 2018, Agenda Report with Attachments
2. Stakeholder Feedback Letter(s)
INTRODUCTIONOn July 24, 2018, City Council initially approved the closure of North Cañon Drive for a minimum of two years and up to six years to mitigate Metro Purple Line Extension — Section 2 construction impacts. Per the Article XII of the MOA with Metro, the closure and conversion to a cul-de-sac were implemented in September 2019, followed by theconstruction of the temporary sound wall across North Cañon Drive at Wilshire Boulevard.
City Council approved a mural designed by Tomokazu Matsuyama, completed in November 2019.DISCUSSION
Since the cul-de-sac was established at North Cañon Drive in 2019, Metro continued construction of Wilshire/Rodeo Station along Wilshire Boulevard between Beverly Drive and Crescent Drive. Over the last two years, installation of piles, decking and station box excavations have been completed. The 20-foot tall North Cañon Drive sound wall has successfully mitigated noise and dust impacts of these major construction activities. Inaddition, the closure provided a safe and consistent traffic pattern and uninterrupted access for businesses located on North Cañon Drive.
Anticipated Construction between 2021 and 2022
For the remaining months of 2021 and through 2022, Metro will continue to set up cranes to access deck panels along Wilshire for material deliveries and pump concrete for building below ground station slabs, plafforms and walls. For these activities, WilshireBoulevard between Beverly Drive and Crescent Drive is typically reduced to a minimum
BEVERLW
HILLS
STAFF REPORT
Meeting Date:
To:
From:
Subject:
Attachments:
September 21, 2021
Honorable Mayor & City Council
Daren Grilley, City Engineer Robert Welch, Engineering Manager Christine Chung, Associate Project Manager
North Cafion Drive Closure Extension Consideration
1. July 24, 2018, Agenda Report with Attachments
2. Stakeholder Feedback Letter(s)
INTRODUCTION
On July 24, 2018, City Council initially approved the closure of North Canon Drive for a minimum of two years and up to six years to mitigate Metro Purple Line Extension - Section 2 construction impacts. Per the Article XII of the MOA with Metro, the closure and conversion to a cul-de-sac were implemented in September 2019, followed by the construction of the temporary sound wall across North Canon Drive at Wilshire Boulevard. City Council approved a mural designed by Tomokazu Matsuyama, completed in November 2019. DISCUSSION
Since the cul-de-sac was established at North Canon Drive in 2019, Metro continued construction of Wilshire/Rodeo Station along Wilshire Boulevard between Beverly Drive and Crescent Drive. Over the last two years, installation of piles, decking and station box excavations have been completed. The 20-foot tall North Canon Drive sound wall has successfully mitigated noise and dust impacts of these major construction activities. In addition, the closure provided a safe and consistent traffic pattern and uninterrupted access for businesses located on North Canon Drive. Anticipated Construction between 2021 and 2022 For the remaining months of 2021 and through 2022, Metro will continue to set up cranes to access deck panels along Wilshire for material deliveries and pump concrete for building below ground station slabs, platforms and walls. For these activities, Wilshire Boulevard between Beverly Drive and Crescent Drive is typically reduced to a minimum Meeting Date: September 21 , 2021
of two lanes in each direction during day shifts and a minimum of one lane in each direction during night shifts. In addition, Metro anticipates starting construction of multipleappendage structures along Wilshire as early as mid-2022, which would also require traffic lane reconfiguration for additional piling and excavation.
Anticipated Construction post-2022While Section 2 construction continues until 2025, City staff anticipates construction of the North Portal, the second entrance for the Wilshire/Rodeo Station, to start as early as 2023 for approximately 2.5 to 3.5 years. Through the certified Environmental Impact Report, a full street closure of North Beverly Drive between Beverly Cañon Gardens and Wilshire Boulevard may be expected due to the limited work area and available staging areas for contractors. During 2022, additional constructability and traffic studies will be developedalong with the North Portal design progress to identify alternative feasible traffic controloptions in order to optimize traffic flows and parking operations in the area duringconstruction.
If the closure and sound wall remain in place until September 2022, traffic patterns will remain consistent along North Cañon Drive, with all mapping applications up to date to reflect current closure and turn restrictions. No overlapping construction nor traffic impacts at North Beverly Drive, associated with the North Portal, are expected in 2022.
The 20-foot sound wall will continue to mitigate noise, dust and lighting spillage from construction activities at the Cañon Yard entrance and Wilshire Boulevard. The Public Information Graphics with business wayfinding signs and mural will remain in place to beautify the cul-de-sac and Wilshire Boulevard side of the sound wall. In addition, the two-way lane conversion from one-way eastbound of Dayton Way, between Crescent Drive and North Cañon Drive, will remain in place until the removal of the North CañonDrive cul-de-sac. The two-way conversion has allowed more convenient access to businesses and parking structures near North Cañon Drive since early 2020.
If the closure and sound walls are removed post-September 2021, traffic patterns would no longer remain consistent along North Cañon Drive near Wilshire Boulevard dueto the intermittent left or right turn restrictions for the station building activities. With continuous access to the Cañon Yard and other activities along Wilshire Boulevard, implementation of daily traffic control along North Cañon Drive as far north as Dayton Way will be necessary with message boards and/or traffic cones near business entrances and valet as well as on-street parking restrictions. Due to dynamic changes in traffic configurations, real-time updates to mapping applications would be challenging. Also, removing the sound wall would impact pedestrian paths to North Cañon Drive withintermittent sidewalk closures. Noise, dust and lighting impacts would be more noticeable to businesses on North Cañon. Finally, removal of the cul-de-sac would increase the chance of Metro heavy construction vehicles potentially driving through North Cañon Drive (though that would be a violation of approved haul routes).
Additionally, since March 2021, two restaurants on the 100 block of North Cañon Drive, Spago and Nusr-Et, have been approved for outdoor dining tents through the COVID-19 response OpenBH program with temporary Special Event Permits. City Council is reviewing any extension to these expansions and if this North Cañon Drive closure item is not approved and the OpenBH expansions recommended to remain up, staff will coordinate on the necessary traffic control and other mitigation measures to avoid conflicts with Metro construction activities near the outdoor dining tents.
Meeting Date: September 21, 2021
of two lanes in each direction during day shifts and a minimum of one lane in each direction during night shifts. In addition, Metro anticipates starting construction of multiple appendage structures along Wilshire as early as mid-2022, which would also require traffic lane reconfiguration for additional piling and excavation.
Anticipated Construction post-2022
While Section 2 construction continues until 2025, City staff anticipates construction of the North Portal, the second entrance for the Wilshire/Rodeo Station, to start as early as 2023 for approximately 2.5 to 3.5 years. Through the certified Environmental Impact Report, a full street closure of North Beverly Drive between Beverly Canon Gardens and Wilshire Boulevard may be expected due to the limited work area and available staging areas for contractors. During 2022, additional constructability and traffic studies will be developed along with the North Portal design progress to identify alternative feasible traffic control options in order to optimize traffic flows and parking operations in the area during construction.
If the closure and sound wall remain in place until September 2022, traffic patterns will remain consistent along North Canon Drive, with all mapping applications up to date to reflect current closure and turn restrictions. No overlapping construction nor traffic impacts at North Beverly Drive, associated with the North Portal, are expected in 2022. The 20-foot sound wall will continue to mitigate noise, dust and lighting spillage from construction activities at the Canon Yard entrance and Wilshire Boulevard. The Public Information Graphics with business wayfinding signs and mural will remain in place to beautify the cul-de-sac and Wilshire Boulevard side of the sound wall. In addition, the two-way lane conversion from one-way eastbound of Dayton Way, between Crescent Drive and North Canon Drive, will remain in place until the removal of the North Canon Drive cul-de-sac. The two-way conversion has allowed more convenient access to businesses and parking structures near North Canon Drive since early 2020. If the closure and sound walls are removed post-September 2021, traffic patterns would no longer remain consistent along North Canon Drive near Wilshire Boulevard due to the intermittent left or right turn restrictions for the station building activities. With continuous access to the Canon Yard and other activities along Wilshire Boulevard, implementation of daily traffic control along North Canon Drive as far north as Dayton Way will be necessary with message boards and/or traffic cones near business entrances and valet as well as on-street parking restrictions. Due to dynamic changes in traffic configurations, real-time updates to mapping applications would be challenging. Also, removing the sound wall would impact pedestrian paths to North Canon Drive with intermittent sidewalk closures. Noise, dust and lighting impacts would be more noticeable to businesses on North Canon. Finally, removal of the cul-de-sac would increase the chance of Metro heavy construction vehicles potentially driving through North Canon Drive (though that would be a violation of approved haul routes). Additionally, since March 2021, two restaurants on the 100 block of North Canon Drive, Spago and Nusr-Et, have been approved for outdoor dining tents through the COVID-19 response OpenBH program with temporary Special Event Permits. City Council is reviewing any extension to these expansions and if this North Canon Drive closure item is not approved and the OpenBH expansions recommended to remain up, staff will coordinate on the necessary traffic control and other mitigation measures to avoid conflicts with Metro construction activities near the outdoor dining tents. Page 2 of 4 Meeting Date: September 21 , 2021
Community EngagementCity and Metro staff completed the following community meetings and stakeholder outreach to receive feedback on the proposed North Cañon Drive closure extension until September 2022.
. Item discussed at the monthly community outreach meetings held on August 4, 2021 , and September 2, 2021 ; no comments nor questions were received. . Item discussed at the monthly Chamber of Commerce Stakeholder Meetings held on August 1 1 , 2021 , and September 8, 2021 ; no objection was received. . Small Business Assistance Task Force Committee Liaison and Beverly Hills Chamber of Commerce Government Affairs Committee meetings were held on August 1 1 , 2021 , and August 1 2, 2021 ; no objection was received. . Staff held a joint meeting with leadership representatives from the Next Beverly Hills Committee and the Arts and Culture Commission on August 24, 2021; no objection was received on the extension of the North Cañon closure for anotheryear. Staff answered questions about potential opportunities to maintain aesthetic site conditions of the North Portal project.
. One-on-one meetings with stakeholders located along North Cañon Drive between Wilshire Boulevard and North Santa Monica Boulevard were held, either virtually or by in-person visits, in July and August 2021 . Some of the stakeholders includethe Maybourne Beverly Hills, 9401 Wilshire, Spago, Nusr-Et, Hilton & Hyland, Brickstar Capital, Canon Properties, Mastro’s, the Beverly Hills Chamber of Commerce, Rodeo Realty, 190 N Cañon Dr. Fred Hyman Building and TheStandard Oil Investment Group. All stakeholders support the extension of the North Cañon Drive closure for another year and staff answered questions about the North Portal project. A support letter from the Beverly Hills Chamber of Commerce is labeled as Attachment 2. The Canon Properties did not share any opinion to the extension of North Cañon Drive closure.
. Completed hand delivery of Cañon Closure Drive extension notices to the residents and businesses bound by Clifton Way, Gregory, El Camino Dr. and Rexford Dr., and emailed the notices to Metro’s and the City’s databases. Links to this notice and upcoming City Council meeting agenda items were posted on both the City and Metro websites and shared on social media platforms. No comments nor questions were received.
Overall, staff has received support and/or no objection to the request from the residential and business communities. Staff will monitor resident and business concerns and work with Metro and appropriate City departments to mitigate any North Cañon Drive closure related concerns.Next StepsBased on public feedback and anticipated construction impacts, Staff recommends considering the extension of North Cañon Drive closure for an additional one (1) year until September 2022.
Meeting Date: September 21, 2021
Community Engagement City and Metro staff completed the following community meetings and stakeholder outreach to receive feedback on the proposed North Canon Drive closure extension until September 2022.
• Item discussed at the monthly community outreach meetings held on August 4, 2021, and September 2, 2021; no comments nor questions were received. • Item discussed at the monthly Chamber of Commerce Stakeholder Meetings held on August 11, 2021, and September 8, 2021; no objection was received. • Small Business Assistance Task Force Committee Liaison and Beverly Hills Chamber of Commerce Government Affairs Committee meetings were held on August 11, 2021, and August 12, 2021; no objection was received. • Staff held a joint meeting with leadership representatives from the Next Beverly Hills Committee and the Arts and Culture Commission on August 24, 2021; no objection was received on the extension of the North Calion closure for another year. Staff answered questions about potential opportunities to maintain aesthetic site conditions of the North Portal project.
• One-on-one meetings with stakeholders located along North Canon Drive between Wilshire Boulevard and North Santa Monica Boulevard were held, either virtually or by in-person visits, in July and August 2021. Some of the stakeholders include the Maybourne Beverly Hills, 9401 Wilshire, Spago, Nusr-Et, Hilton & Hyland, Brickstar Capital, Canon Properties, Mastro's, the Beverly Hills Chamber of Commerce, Rodeo Realty, 190 N Canon Dr. Fred Hyman Building and The Standard Oil Investment Group. All stakeholders support the extension of the North Canon Drive closure for another year and staff answered questions about the North Portal project. A support letter from the Beverly Hills Chamber of Commerce is labeled as Attachment 2. The Canon Properties did not share any opinion to the extension of North Canon Drive closure.
• Completed hand delivery of Canon Closure Drive extension notices to the residents and businesses bound by Clifton Way, Gregory, El Camino Dr. and Rexford Dr., and emailed the notices to Metro's and the City's databases. Links to this notice and upcoming City Council meeting agenda items were posted on both the City and Metro websites and shared on social media platforms. No comments nor questions were received. Overall, staff has received support and/or no objection to the request from the residential and business communities. Staff will monitor resident and business concerns and work with Metro and appropriate City departments to mitigate any North Canon Drive closurerelated concerns. Next Steps Based on public feedback and anticipated construction impacts, Staff recommends considering the extension of North Canon Drive closure for an additional one (1) year until September 2022.
Meeting Date: September 21 2021
If approved, staff will continue maintenance of the mural and Public Information Graphics on the sound wall and the landscaped planters to upkeep the cul-de-sac aesthetically pleasing. Also, in September 2022, staff will provide updates of the North Portal project to City Council to consider whether to extend the temporary closure of North Cañon Drive at Wilshire Boulevard.
If not approved, staff will schedule to remove the mural and coordinate with Metro to remove the temporary sound wall. With this decision, if the outdoor dining tents at the North Cañon cul-de-sac are approved to be extended beyond December 2021 , the Public Works Project staff will coordinate with OpenBH staff and stakeholders to amend the OpenBH permits to include necessary traffic control and other mitigation measures to avoid conflicts with construction activities near the outdoor dining tents. Also, City staff will continue to monitor Metro construction for compliance with the MOA and the outdoor dining operation for compliance with OpenBH permits.
Environmental Considerations
The Final Environmental Impact Report (EIR) /Environmental Impact Statement (ElS) prepared by Metro covers the impacts of North Cañon Drive closure at Wilshire Boulevard until the end of Purple Line Extension — Section 2 construction.
FISCAL IMPACT
There is no direct fiscal impact associated with approving this request. The terms of the Memorandum of Agreement (MOA) with Metro include provisions to providereimbursement of costs for all staff and consultants performing work associated with the Purple Line Extension — Section 2 (Wilshire/Rodeo Station) in Beverly Hills, including the installation and removal of the temporary sound wall at North Cañon Drive.
The Fiscal Year 2022 CIP budget includes an appropriation of $3,086,887 for Metro project related mitigation and engineering expenses. Such expenses include the monitoring of North Cañon Drive closure and maintenance of Public Information Graphics and mural at the sound wall.
RECOMMENDATION
Staff recommends that City Council move to approve an additional one (1) year extensionof the temporary closure of North Cañon Drive at Wilshire Boulevard until September 30, 2022.
Shana Epstein,
Director of Public Works
Approved By
Meeting Date: September 21, 2021
If approved, staff will continue maintenance of the mural and Public Information Graphics on the sound wall and the landscaped planters to upkeep the cul-de-sac aesthetically pleasing. Also, in September 2022, staff will provide updates of the North Portal project to City Council to consider whether to extend the temporary closure of North Canon Drive at Wilshire Boulevard.
If not approved, staff will schedule to remove the mural and coordinate with Metro to remove the temporary sound wall. With this decision, if the outdoor dining tents at the North Canon cul-de-sac are approved to be extended beyond December 2021, the Public Works Project staff will coordinate with OpenBH staff and stakeholders to amend the OpenBH permits to include necessary traffic control and other mitigation measures to avoid conflicts with construction activities near the outdoor dining tents. Also, City staff will continue to monitor Metro construction for compliance with the MOA and the outdoor dining operation for compliance with OpenBH permits.
Environmental Considerations
The Final Environmental Impact Report (EIR) /Environmental Impact Statement (EIS) prepared by Metro covers the impacts of North Canon Drive closure at Wilshire Boulevard until the end of Purple Line Extension - Section 2 construction.
FISCAL IMPACT
There is no direct fiscal impact associated with approving this request. The terms of the Memorandum of Agreement (MOA) with Metro include provisions to provide reimbursement of costs for all staff and consultants performing work associated with the Purple Line Extension - Section 2 (Wilshire/Rodeo Station) in Beverly Hills, including the installation and removal of the temporary sound wall at North Canon Drive.
The Fiscal Year 2022 CIP budget includes an appropriation of $3,086,887 for Metro project related mitigation and engineering expenses. Such expenses include the monitoring of North Canon Drive closure and maintenance of Public Information Graphics and mural at the sound wall.
RECOMMENDATION
Staff recommends that City Council move to approve an additional one (1) year extension of the temporary closure of North Canon Drive at Wilshire Boulevard until September 30, 2022.
Shana Epstein,
Director of Public Works
Approved By
Attachment 3
BEVERLY
HILLS
STAFF REPORT
Meeting Date: September 12, 2022
To: Honorable Mayor & City Council
From: Daren Grilley, Assistant Public Works Director/City Engineer Christine Chung, Project Manager
Subject: North Cañon Drive Closure Extension Consideration Attachments: I . September 21 , 2021 , Agenda Report with Attachments
2. Stakeholder Feedback Letter(s)
INTRODUCTION
On July 24, 2018, City Council initially approved the closure of North Cañon Drive for a minimum of two years and up to six years to mitigate the construction impacts of the Los Angeles County Metropolitan Transportation Authority (Metro) Purple (D) Line Extension project.DISCUSSION
Per Article XII of the MOA with Metro, the street was closed and a cul-de-sac was created in September 2019, followed by the construction of the temporary sound wall across North Cañon Drive at Wilshire Boulevard. City Council approved a mural designed by Tomokazu Matsuyama, which was completed in November 2019. On September 21 , 2021 , City Council approved a one-year extension of the temporary closure of North Cañon Drive until September 30, 2022.
Over the last three years, the installation of piles, decking, station box excavations, station slabs and portions of the station walls and platform have been completed. The 20-foot tall North Cañon Drive sound wall has successfully mitigated the noise and dust impacts of these major construction activities. The closure has also provided a safe and consistent traffic pattern and uninterrupted access for businesses located on North Cañon Drive.
Anticipated Construction between 2022 and 2023
For the remaining months of 2022 and through 2023, Metro will continue to set up cranes to access deck panels along Wilshire Boulevard for material deliveries and pump BEVERL
HILLS
STAFF REPORT
Meeting Date:
To:
From:
Subject:
Attachments:
September 12, 2022
Honorable Mayor & City Council Daren Grilley, Assistant Public Works Director/City Engineer Christine Chung, Project Manager
North Calion Drive Closure Extension Consideration
1. September 21, 2021, Agenda Report with Attachments
2. Stakeholder Feedback Letter(s)
INTRODUCTION
On July 24, 2018, City Council initially approved the closure of North Calion Drive for a minimum of two years and up to six years to mitigate the construction impacts of the Los Angeles County Metropolitan Transportation Authority (Metro) Purple (D) Line Extension project.
DISCUSSION
Per Article XII of the MOA with Metro, the street was closed and a cul-de-sac was created in September 2019, followed by the construction of the temporary sound wall across North Calion Drive at Wilshire Boulevard. City Council approved a mural designed by Tomokazu Matsuyama, which was completed in November 2019. On September 21, 2021, City Council approved a one-year extension of the temporary closure of North Canon Drive until September 30, 2022.
Over the last three years, the installation of piles, decking, station box excavations, station slabs and portions of the station walls and platform have been completed. The 20-foot tall North Canon Drive sound wall has successfully mitigated the noise and dust impacts of these major construction activities. The closure has also provided a safe and consistent traffic pattern and uninterrupted access for businesses located on North Caron Drive.
Anticipated Construction between 2022 and 2023
For the remaining months of 2022 and through 2023, Metro will continue to set up cranes to access deck panels along Wilshire Boulevard for material deliveries and pump Meeting Date: September 12, 2022
concrete to continue to construct below ground station’s entrance, platform, walls, concourse level and other components. For these activities, Wilshire Boulevard between Beverly Drive and Crescent Drive is typically reduced to a minimum of two lanes in each direction during day shifts and a minimum of one lane in each direction during nightshifts.
In addition, Metro anticipates starting construction of multiple appendage structures along Wilshire Boulevard as early as 2023, which would also require traffic lane reconfiguration for additional piling and excavation. Appendage structures include various features such as utility rooms, ventilation shafts, and emergency exits. They are located on the north and south sides of Wilshire Boulevard, extending into sidewalksbetween the alley west of Beverly Drive and Crescent Drive. They are also located onSouth Beverly Drive and South Cañon Drive and extend up to approximately 170 feet south of Wilshire Boulevard.
As part of the appendage construction, the MOA allows for a full closure of South Beverly Drive (north of the alley south of Wilshire) for decking and piling for up to five weekends. Full closure of South Cañon Drive at Wilshire Blvd (north of the alley south of Wilshire Boulevard) is also allowed for decking and piling on weekends from 7:00am to I 0:OOpm.
Anticipated Construction post-2023
While Metro Section 2 construction continues until 2025, the construction of the North Portal (the second entrance for the Wilshire/Rodeo Station) may begin as early as 2024.
On May 10, 2022, City Council approved an agreement for the North Portal design, which is anticipated to take approximately 18 months. Once potential constructability constraints are proofed by late 2022, the schematic design package with traffic studies and construction staging plans will be available by the first Quarter of 2023. In 2023, the design would progress enough to identify tentative traffic impacts of North Beverly Drive between Beverly Cañon Gardens and Wilshire Boulevard.
If the closure and sound wall remain in place until 2023, traffic patterns will remain consistent. No construction or traffic impacts associated with the North Portal at North Beverly Drive will occur before 2024, at the earliest. The 20-foot sound wall will continue to mitigate noise, dust and lighting from construction activities at the Cañon Yard entrance and Wilshire Boulevard. The Public Information Graphics with business wayfinding signs and the sound wall mural will remain in place to beautify the cul-de-sac and Wilshire Boulevard side of the sound wall.
If the closure and sound walls are removed post-September 2022, traffic patterns at North Cañon Drive and Wilshire Boulevard would require changes each day with closures and/or turn restrictions as the station construction continues. With continuousaccess to the Cañon Yard and other activities along Wilshire Boulevard, implementationof daily traffic control along North Cañon Drive as far north as Dayton Way will be necessary with message boards and/or traffic cones near business entrances and valet as well as on-street parking restrictions. Removing the sound wall would also impact pedestrian paths to North Cañon Drive with intermittent sidewalk closures. Noise, dust and lighting impacts would be more noticeable to businesses on North Cañon Drive.
Finally, removing the cul-de-sac would increase the chance of Metro heavy construction vehicles driving along North Cañon Drive (though that would be a violation of approved haul routes).
Meeting Date: September 12, 2022
concrete to continue to construct below ground station's entrance, platform, walls, concourse level and other components. For these activities, Wilshire Boulevard between Beverly Drive and Crescent Drive is typically reduced to a minimum of two lanes in each direction during day shifts and a minimum of one lane in each direction during night shifts. In addition, Metro anticipates starting construction of multiple appendage structures along Wilshire Boulevard as early as 2023, which would also require traffic lane reconfiguration for additional piling and excavation. Appendage structures include various features such as utility rooms, ventilation shafts, and emergency exits. They are located on the north and south sides of Wilshire Boulevard, extending into sidewalks between the alley west of Beverly Drive and Crescent Drive. They are also located on South Beverly Drive and South Canon Drive and extend up to approximately 170 feet south of Wilshire Boulevard. As part of the appendage construction, the MOA allows for a full closure of South Beverly Drive (north of the alley south of Wilshire) for decking and piling for up to five weekends. Full closure of South Canon Drive at Wilshire Blvd (north of the alley south of Wilshire Boulevard) is also allowed for decking and piling on weekends from 7:00am to 10:00pm.
Anticipated Construction post-2023 While Metro Section 2 construction continues until 2025, the construction of the North Portal (the second entrance for the Wilshire/Rodeo Station) may begin as early as 2024.
On May 10, 2022, City Council approved an agreement for the North Portal design, which is anticipated to take approximately 18 months. Once potential constructability constraints are proofed by late 2022, the schematic design package with traffic studies and construction staging plans will be available by the first Quarter of 2023. In 2023, the design would progress enough to identify tentative traffic impacts of North Beverly Drive between Beverly Canon Gardens and Wilshire Boulevard.
If the closure and sound wall remain in place until 2023, traffic patterns will remain consistent. No construction or traffic impacts associated with the North Portal at North Beverly Drive will occur before 2024, at the earliest. The 20-foot sound wall will continue to mitigate noise, dust and lighting from construction activities at the Canon Yard entrance and Wilshire Boulevard. The Public Information Graphics with business wayfinding signs and the sound wall mural will remain in place to beautify the cul-de-sac and Wilshire Boulevard side of the sound wall. If the closure and sound walls are removed post-September 2022, traffic patterns at North Canon Drive and Wilshire Boulevard would require changes each day with closures and/or turn restrictions as the station construction continues. With continuous access to the Canon Yard and other activities along Wilshire Boulevard, implementation of daily traffic control along North Canon Drive as far north as Dayton Way will be necessary with message boards and/or traffic cones near business entrances and valet as well as on-street parking restrictions. Removing the sound wall would also impact pedestrian paths to North Canon Drive with intermittent sidewalk closures. Noise, dust and lighting impacts would be more noticeable to businesses on North Canon Drive. Finally, removing the cul-de-sac would increase the chance of Metro heavy construction vehicles driving along North Canon Drive (though that would be a violation of approved haul routes).
Meeting Date: September 12, 2022
Since March 2021, restaurants on the 100 block of North Cañon Drive have operated outdoor dining through the COVID-19 response OpenBH program with temporary Special Event Permits. The current OpenBH permit for Spago’s outdoor dining tent is approved by City Council through December 31 , 2022. The OpenBH permit for NusrEt’soutdoor dining parklet was recently approved with an estimated installation date in midSeptember. If the North Cañon Drive closure is not extended, staff will coordinate on the necessary traffic control and other mitigation measures to avoid conflicts with Metro construction activities near the outdoor dining areas with the impacted OpenBH businesses.Community Engagement
City and Metro staff completed the following community meetings and stakeholder outreach to receive feedback on the initial proposal to extend the North Cañon Drive closure extension until September 2023.
. Monthly Chamber of Commerce Stakeholder Meetings held on July 13, 2022, and August 10, 2022.
. Metro community outreach meeting held September 7, 2022 . Staff informed Beverly Hills Chamber of Commerce Government Affairs Committee in July 2022, City and County Policy Subcommittee on August 25, 2022, and Small Business Assistance Task Force Committee Liaison in September 2022. The Chamber of Commerce supports the extension of the closure up to 9 months and requests the City staff to evaluate the need for theclosure and the wall by June 2023. . Staff held a meeting with the Next Beverly Hills Committee and the Arts and Culture Commission representatives on September 1 , 2022; no objection was received.
. One-on-one meetings with stakeholders located along North Cañon Drive between Wilshire Boulevard and North Santa Monica Boulevard were held, either virtually or by in-person visits, in July and August 2022. Some of the stakeholders include the Maybourne Beverly Hills, 9401 Wilshire, Spago, Nusr-Et, Hilton & Hyland, Brickstar Capital, Canon Properties, Mastro’s, Rodeo Realty and 190 N Cañon Dr. Fred Hayman Building. All stakeholders support the extension of the North Cañon Drive closure for another year and staff answered questions about the North Portal project. Support letters from the 9401 Wilshire, Nusr-Et, and a resident at South Camden Drive are included as Attachment 2. . Cañon Closure Drive extension notices were hand delivered to the residents and businesses bound by Clifton Way, Gregory, El Camino Dr., and Rexford Dr.
These same notices were emailed to Metro and the City’s contact database in August 2022. Links to this notice and upcoming City Council meeting agenda items were posted on both the City and Metro websites and shared on socialmedia platforms. No comments nor questions were received.
Overall, staff has received support and/or no objection to the request from the residential and business communities. Based on feedback received from stakeholders, staff revised the proposed closure extension to nine months instead of one year.
Meeting Date: September 12, 2022
Since March 2021, restaurants on the 100 block of North Canon Drive have operated outdoor dining through the COVID-19 response OpenBH program with temporary Special Event Permits. The current OpenBH permit for Spago's outdoor dining tent is approved by City Council through December 31, 2022. The OpenBH permit for NusrEt's outdoor dining parklet was recently approved with an estimated installation date in midSeptember. If the North Canon Drive closure is not extended, staff will coordinate on the necessary traffic control and other mitigation measures to avoid conflicts with Metro construction activities near the outdoor dining areas with the impacted OpenBH businesses. Community Engagement
City and Metro staff completed the following community meetings and stakeholder outreach to receive feedback on the initial proposal to extend the North Canon Drive closure extension until September 2023. • Monthly Chamber of Commerce Stakeholder Meetings held on July 13, 2022, and August 10, 2022.
• Metro community outreach meeting held September 7, 2022 • Staff informed Beverly Hills Chamber of Commerce Government Affairs Committee in July 2022, City and County Policy Subcommittee on August 25, 2022, and Small Business Assistance Task Force Committee Liaison in September 2022. The Chamber of Commerce supports the extension of the closure up to 9 months and requests the City staff to evaluate the need for the closure and the wall by June 2023. • Staff held a meeting with the Next Beverly Hills Committee and the Arts and Culture Commission representatives on September 1, 2022; no objection was received.
• One-on-one meetings with stakeholders located along North Canon Drive between Wilshire Boulevard and North Santa Monica Boulevard were held, either virtually or by in-person visits, in July and August 2022. Some of the stakeholders include the Maybourne Beverly Hills, 9401 Wilshire, Spago, Nusr-Et, Hilton & Hyland, Brickstar Capital, Canon Properties, Mastro's, Rodeo Realty and 190 N Canon Dr. Fred Hayman Building. All stakeholders support the extension of the North Canon Drive closure for another year and staff answered questions about the North Portal project. Support letters from the 9401 Wilshire, Nusr-Et, and a resident at South Camden Drive are included as Attachment 2. • Canon Closure Drive extension notices were hand delivered to the residents and businesses bound by Clifton Way, Gregory, El Camino Dr., and Rexford Dr. These same notices were emailed to Metro and the City's contact database in August 2022. Links to this notice and upcoming City Council meeting agenda items were posted on both the City and Metro websites and shared on social media platforms. No comments nor questions were received. Overall, staff has received support and/or no objection to the request from the residential and business communities. Based on feedback received from stakeholders, staff revised the proposed closure extension to nine months instead of one year.
Meeting Date: September 12, 2022
Next StepsIf the extension of the closure is approved, staff will continue maintenance of the mural and Public Information Graphics on the sound wall and the landscaped planters to upkeep the cul-de-sac as aesthetically pleasing. Staff will also monitor community concerns and work with Metro and appropriate City departments to mitigate any North Cañon Drive closure-related concerns. Near the expiration date of the closure, staff will provide updates on the North Portal project to City Council to consider whether or not to further extend the temporary closure of North Cañon Drive at Wilshire Boulevard.
If this item is not approved, staff will schedule to remove the mural and coordinate with Metro to remove the temporary sound wall. With this decision, Public Works staff will coordinate with OpenBH staff and stakeholders to amend the outdoor dining permits to include necessary traffic control or other measures to avoid conflicts with construction activities near the outdoor dining tent and/or parklet.
Environmental Considerations
The Final Environmental Impact Report (EIR) /Environmental Impact Statement (EIS) prepared by Metro covers the impacts of North Cañon Drive closure at Wilshire Boulevard until the end of Purple Line Extension — Section 2 construction.
FISCAL IMPACT
There is no direct fiscal impact associated with approving this request. Per the MOA, Metro is to pay for the installation and removal of the sound wall and other work associated with the closure, as well as reimburse the City for its associated costs.
Funds are available in the approved budget for CIP No. 00050 for Metro project-related mitigation and engineering expenses, including the monitoring of North Cañon Drive closure and maintenance of Public Information Graphics and mural at the sound wall.
RECOMMENDATION
Considering the anticipated work and outreach comments, Staff recommends that CityCouncil move to approve an additional nine-month extension of the temporary closure of North Cañon Drive at Wilshire Boulevard until June 30, 2023.
Shana Epstein,
Director of Public Works
Approved By
Meeting Date: September 12, 2022 Next Steps
If the extension of the closure is approved, staff will continue maintenance of the mural and Public Information Graphics on the sound wall and the landscaped planters to upkeep the cul-de-sac as aesthetically pleasing. Staff will also monitor community concerns and work with Metro and appropriate City departments to mitigate any North Canon Drive closure-related concerns. Near the expiration date of the closure, staff will provide updates on the North Portal project to City Council to consider whether or not to further extend the temporary closure of North Canon Drive at Wilshire Boulevard.
If this item is not approved, staff will schedule to remove the mural and coordinate with Metro to remove the temporary sound wall. With this decision, Public Works staff will coordinate with OpenBH staff and stakeholders to amend the outdoor dining permits to include necessary traffic control or other measures to avoid conflicts with construction activities near the outdoor dining tent and/or parklet.
Environmental Considerations
The Final Environmental Impact Report (EIR) /Environmental Impact Statement (EIS) prepared by Metro covers the impacts of North Canon Drive closure at Wilshire Boulevard until the end of Purple Line Extension - Section 2 construction. FISCAL IMPACT There is no direct fiscal impact associated with approving this request. Per the MOA, Metro is to pay for the installation and removal of the sound wall and other work associated with the closure, as well as reimburse the City for its associated costs. Funds are available in the approved budget for CIP No. 00050 for Metro project-related mitigation and engineering expenses, including the monitoring of North Canon Drive closure and maintenance of Public Information Graphics and mural at the sound wall.
RECOMMENDATION
Considering the anticipated work and outreach comments, Staff recommends that City Council move to approve an additional nine-month extension of the temporary closure of North Canon Drive at Wilshire Boulevard until June 30, 2023. Shana Epstein, Director of Public Works
Approved By
Attachment 4
çBEVERLYRLY
STAFF REPORT
Meeting Date: June 6, 2023
To: Honorable Mayor & City Council
From: Daren Grilley, Assistant Public Works Director/City Engineer Christine Chung, Project Manager
Subject: North Cañon Drive Closure Extension Consideration Attachments: I . September 1 2, 2022, Staff Report with Attachments
2. Stakeholder Feedback Emails
INTRODUCTION
On July 24, 2018, City Council initially approved the closure of North Cañon Drive for a minimum of two years and up to six years to mitigate the construction impacts of the Los Angeles County Metropolitan Transportation Authority (Metro) Purple (D) Line Extension project.
DISCUSSION
Per Article XII of the MOA with Metro, the street was closed and a cul-de-sac was created in September 201 9, followed by the construction of the temporary sound wall across North Cañon Drive at Wilshire Boulevard. City Council approved a muraldesigned by Tomokazu Matsuyama, which was completed in November 2019. On September 21 , 2021 , City Council approved a one-year extension of the temporary closure of North Cañon Drive until September 30, 2022. On September 12, 2022, City Council approved a nine-month extension of the temporary closure until June 30, 2023.
The Wilshire/Rodeo station construction along Wilshire Blvd is underway and made nearly 60% progress in building the station structure. The 20-foot tall North Cañon Drive sound wall has successfully mitigated the noise and dust impacts of these majorconstruction activities. The closure has also provided a safe and consistent traffic patternand uninterrupted access for businesses located on North Cañon Drive.
Anticipated Construction between 2023 and 2024
For the remaining months of 2023 and through 2024, Metro will continue to set up cranes to access deck panels along Wilshire Boulevard for material deliveries and pump BEVERL
HILLS
STAFF REPORT
Meeting Date:
To:
From: Subject:
Attachments:
June 6, 2023
Honorable Mayor & City Council
Daren Grilley, Assistant Public Works Director/City Engineer Christine Chung, Project Manager
North Canon Drive Closure Extension Consideration
1. September 12, 2022, Staff Report with Attachments
2. Stakeholder Feedback Emails
INTRODUCTION
On July 24, 2018, City Council initially approved the closure of North Canon Drive for a minimum of two years and up to six years to mitigate the construction impacts of the Los Angeles County Metropolitan Transportation Authority (Metro) Purple (D) Line Extension project.
DISCUSSION
Per Article XI I of the MOA with Metro, the street was closed and a cul-de-sac was created in September 2019, followed by the construction of the temporary sound wall across North Canon Drive at Wilshire Boulevard. City Council approved a mural designed by Tomokazu Matsuyama, which was completed in November 2019. On September 21, 2021, City Council approved a one-year extension of the temporary closure of North Canon Drive until September 30, 2022. On September 12, 2022, City Council approved a nine-month extension of the temporary closure until June 30, 2023.
The Wilshire/Rodeo station construction along Wilshire Blvd is underway and made nearly 60% progress in building the station structure. The 20-foot tall North Canon Drive sound wall has successfully mitigated the noise and dust impacts of these major construction activities. The closure has also provided a safe and consistent traffic pattern and uninterrupted access for businesses located on North Canon Drive.
Anticipated Construction between 2023 and 2024
For the remaining months of 2023 and through 2024, Metro will continue to set up cranes to access deck panels along Wilshire Boulevard for material deliveries and pump Meeting Date: June 6, 2023
concrete to continue to construct below ground station’s entrance, concourse level, walls, roof deck, side structures and other components. For these activities, Wilshire Boulevard between Beverly Drive and Crescent Drive is typically reduced to a minimum of two lanes in each direction during day shifts and a minimum of one lane in eachdirection during night shifts.
In addition, Metro begins construction of multiple appendage structures at South Beverly Drive and South Cañon Drive in late May 2023 until early 2024. Appendage structures include various features such as utility rooms, ventilation shafts, and emergency exits.
They are located on the north and south sides of Wilshire Boulevard, extending into sidewalks between the alley west of Beverly Drive and Crescent Drive. They are also located on South Beverly Drive and South Cañon Drive and extend to approximately 170 feet south of Wilshire Boulevard.As part of the appendage construction, the MQA allows for a full closure of South Beverly Drive (north of the alley south of Wilshire) for decking and piling up to five weekends from Friday 8:00pm to Monday 7:00am. Full closure of South Cañon Drive at Wilshire Blvd (north of the alley south of Wilshire Boulevard) is also allowed for decking and piling on weekends. For any long-term traffic reconfiguration proposal for theappendage work, Metro will require a traffic study to verify the minimal impact on the traffic flow along the arterial streets or seek alternative traffic control and/or mitigation options.
If the closure and sound wall remain in place until the end of 2023, traffic patterns will remain consistent. No construction or traffic impacts associated with the North Portal at North Beverly Drive will occur before 2025, at the earliest, based on the preliminary design review. Also, North Beverly Drive will remain accessible with a traffic taper partially extended from South Beverly Drive during the appendage construction.
The 20-foot sound wall will continue to mitigate noise, dust and lighting from construction activities at the Cañon Yard entrance and Wilshire Boulevard. The Public Information Graphics with business wayfinding signs and the sound wall mural will remain in place to beautify the cul-de-sac and Wilshire Boulevard side of the sound wall.
If the closure and sound walls are removed post-June 2023, traffic patterns at North Cañon Drive and Wilshire Boulevard would require daily changes with closures and/or turn restrictions as the station construction continues. With continuous access to the Cañon Yard and other activities along Wilshire Boulevard, implementation of daily traffic control will be necessary along North Cañon Drive as far north as Dayton Way using message boards, detour signage, and/or traffic cones near business entrances,permitted parklets, and valet as well as on-street parking restrictions. Removing the sound wall would also impact pedestrian paths to North Cañon Drive with intermittentsidewalk closures. Noise, dust and lighting impacts would be more noticeable to businesses on North Cañon Drive. It would also create an irregular traffic pattern as detours must be implemented daily due to day and night traffic control and crane setup for deck access on Wilshire Blvd. Finally, removing the cul-de-sac would increase the chance of Metro heavy construction vehicles driving along North Cañon Drive (though that would violate approved haul routes).
Community EngagementCity and Metro staff completed the following community meetings and stakeholder outreach to receive feedback on the proposal to extend the North Cañon Drive closureextension until December 2023.
Meeting Date: June 6, 2023
concrete to continue to construct below ground station's entrance, concourse level, walls, roof deck, side structures and other components. For these activities, Wilshire Boulevard between Beverly Drive and Crescent Drive is typically reduced to a minimum of two lanes in each direction during day shifts and a minimum of one lane in each direction during night shifts. In addition, Metro begins construction of multiple appendage structures at South Beverly Drive and South Canon Drive in late May 2023 until early 2024. Appendage structures include various features such as utility rooms, ventilation shafts, and emergency exits. They are located on the north and south sides of Wilshire Boulevard, extending into sidewalks between the alley west of Beverly Drive and Crescent Drive. They are also located on South Beverly Drive and South Canon Drive and extend to approximately 170 feet south of Wilshire Boulevard. As part of the appendage construction, the MOA allows for a full closure of South Beverly Drive (north of the alley south of Wilshire) for decking and piling up to five weekends from Friday 8:00pm to Monday 7:00am. Full closure of South Canon Drive at Wilshire Blvd (north of the alley south of Wilshire Boulevard) is also allowed for decking and piling on weekends. For any long-term traffic reconfiguration proposal for the appendage work, Metro will require a traffic study to verify the minimal impact on the traffic flow along the arterial streets or seek alternative traffic control and/or mitigation options.
If the closure and sound wall remain in place until the end of 2023, traffic patterns will remain consistent. No construction or traffic impacts associated with the North Portal at North Beverly Drive will occur before 2025, at the earliest, based on the preliminary design review. Also, North Beverly Drive will remain accessible with a traffic taper partially extended from South Beverly Drive during the appendage construction.
The 20-foot sound wall will continue to mitigate noise, dust and lighting from construction activities at the Canon Yard entrance and Wilshire Boulevard. The Public Information Graphics with business wayfinding signs and the sound wall mural will remain in place to beautify the cul-de-sac and Wilshire Boulevard side of the sound wall. If the closure and sound walls are removed post-June 2023, traffic patterns at North Canon Drive and Wilshire Boulevard would require daily changes with closures and/or turn restrictions as the station construction continues. With continuous access to the Canon Yard and other activities along Wilshire Boulevard, implementation of daily traffic control will be necessary along North Canon Drive as far north as Dayton Way using message boards, detour signage, and/or traffic cones near business entrances, permitted parklets, and valet as well as on-street parking restrictions. Removing the sound wall would also impact pedestrian paths to North Canon Drive with intermittent sidewalk closures. Noise, dust and lighting impacts would be more noticeable to businesses on North Canon Drive. It would also create an irregular traffic pattern as detours must be implemented daily due to day and night traffic control and crane setup for deck access on Wilshire Blvd. Finally, removing the cul-de-sac would increase the chance of Metro heavy construction vehicles driving along North Canon Drive (though that would violate approved haul routes). Community Engagement City and Metro staff completed the following community meetings and stakeholder outreach to receive feedback on the proposal to extend the North Canon Drive closure extension until December 2023.
Meeting Date: June 6, 2023
. Monthly Chamber of Commerce Stakeholder Meetings held on April 12 and May 10, 2023.
. Metro community outreach meeting held April 12, 2023. . Staff informed Beverly Hills Chamber of Commerce Government Affairs Committee on April 20, 2023, and the Chamber Small Business Assistance Task Force Committee Liaison on May 23, 2023. The Government Affairs Committee supports the extension of the closure up to 6 months and requests the City staff to evaluate the potential impacts of appendage work with the closure. North Beverly Drive will remain accessible during the appendage work and Staff will require a traffic study for any long-term traffic reconfiguration. . Staff informed the Next Beverly Hills Committee and the Arts and Culture Commission representatives on May I 8, 2023; no objection was received. . One-on-one contacts made with stakeholders located along North Cañon Drive between Wilshire Boulevard and North Santa Monica Boulevard between March and May 2023. Some of the stakeholders include the Maybourne Beverly Hills, 9401 Wilshire, Spago, Nusr-Et, Hilton & Hyland, Brickstar Capital, Canon Properties, Mastro’s, Rodeo Realty and 190 N Cañon Dr. Fred Hayman Building.Majority of the stakeholders support the additional six-month extension of the North Cañon Drive closure. Support emails from the Nusr-Et and Fred HaymanBuilding are included as Attachment 2. . Cañon Drive Closure extension notices were hand-delivered to the residents and businesses bound by Dayton Way, Gregory Way, El Camino Dr. , and Rexford Dr on May I 8, 2023. These same notices were emailed to Metro contact database on May 26, 2023. Links to this notice and upcoming City Council meeting agenda items were posted on both the City and Metro websites and shared on socialmedia platforms. No comments nor questions were received.
Overall, staff has received support and/or no objection to the request from the residential and business communities.
Next Steps
If the extension of the closure is approved, staff will continue maintenance of the mural and Public Information Graphics on the sound wall and the landscaped planters to keep the cul-de-sac aesthetically pleasing. Staff will also monitor community concerns and work with Metro and appropriate City departments to mitigate any North Cañon Drive closure-related concerns. Near the expiration date of the closure, staff will provide updates on the Purple Line project to City Council to consider whether or not to further extend the temporary closure of North Cañon Drive at Wilshire Boulevard.
If this item is not approved, staff will schedule to remove the mural and coordinate with Metro to remove the temporary sound wall. With this decision, Public Works staff will coordinate with OpenBH staff and stakeholders to amend the outdoor dining permits to include necessary traffic control or other measures to avoid conflicts with construction activities near the dining parklet.
Meeting Date: June 6, 2023
• Monthly Chamber of Commerce Stakeholder Meetings held on April 12 and May 10, 2023. • Metro community outreach meeting held April 12, 2023. • Staff informed Beverly Hills Chamber of Commerce Government Affairs Committee on April 20, 2023, and the Chamber Small Business Assistance Task Force Committee Liaison on May 23, 2023. The Government Affairs Committee supports the extension of the closure up to 6 months and requests the City staff to evaluate the potential impacts of appendage work with the closure. North Beverly Drive will remain accessible during the appendage work and Staff will require a traffic study for any long-term traffic reconfiguration. • Staff informed the Next Beverly Hills Committee and the Arts and Culture Commission representatives on May 18, 2023; no objection was received. • One-on-one contacts made with stakeholders located along North Canon Drive between Wilshire Boulevard and North Santa Monica Boulevard between March and May 2023. Some of the stakeholders include the Maybourne Beverly Hills, 9401 Wilshire, Spago, Nusr-Et, Hilton & Hyland, Brickstar Capital, Canon Properties, Mastro's, Rodeo Realty and 190 N Canon Dr. Fred Hayman Building.
Majority of the stakeholders support the additional six-month extension of the North Canon Drive closure. Support emails from the Nusr-Et and Fred Hayman Building are included as Attachment 2. • Canon Drive Closure extension notices were hand-delivered to the residents and businesses bound by Dayton Way, Gregory Way, El Camino Dr., and Rexford Dr on May 18, 2023. These same notices were emailed to Metro contact database on May 26, 2023. Links to this notice and upcoming City Council meeting agenda items were posted on both the City and Metro websites and shared on social media platforms. No comments nor questions were received.
Overall, staff has received support and/or no objection to the request from the residential and business communities.
Next Steps
If the extension of the closure is approved, staff will continue maintenance of the mural and Public Information Graphics on the sound wall and the landscaped planters to keep the cul-de-sac aesthetically pleasing. Staff will also monitor community concerns and work with Metro and appropriate City departments to mitigate any North Canon Drive closure-related concerns. Near the expiration date of the closure, staff will provide updates on the Purple Line project to City Council to consider whether or not to further extend the temporary closure of North Canon Drive at Wilshire Boulevard. If this item is not approved, staff will schedule to remove the mural and coordinate with Metro to remove the temporary sound wall. With this decision, Public Works staff will coordinate with OpenBH staff and stakeholders to amend the outdoor dining permits to include necessary traffic control or other measures to avoid conflicts with construction activities near the dining parklet.
Meeting Date: June 6, 2023
Environmental Considerations
The Final Environmental Impact Report (EIR) /Environmental Impact Statement (EIS) prepared by Metro covers the impacts of North Cañon Drive closure at Wilshire Boulevard until the end of Purple Line Extension — Section 2 construction.
FISCAL IMPACT
There is no direct fiscal impact associated with approving this request. Per the MOA, Metro is to pay for the installation and removal of the sound wall and other work associated with the closure, as well as reimburse the City for its associated costs.
Funds are available in the approved budget for CIP No. 00050 for Metro project-related mitigation and engineering expenses, including the monitoring of North Cañon Drive closure and maintenance of Public Information Graphics and mural at the sound wall.
RECOMMENDATION
Considering the anticipated work and outreach comments, Staff recommends that CityCouncil approve an additional six-month extension of the temporary closure of North Cañon Drive at Wilshire Boulevard until December 31, 2023.
Shana Epstein,
Director of Public Works
Approved By
Meeting Date: June 6, 2023
Environmental Considerations
The Final Environmental Impact Report (EIR) /Environmental Impact Statement (EIS) prepared by Metro covers the impacts of North Canon Drive closure at Wilshire Boulevard until the end of Purple Line Extension - Section 2 construction. FISCAL IMPACT There is no direct fiscal impact associated with approving this request. Per the MOA, Metro is to pay for the installation and removal of the sound wall and other work associated with the closure, as well as reimburse the City for its associated costs.
Funds are available in the approved budget for CIP No. 00050 for Metro project-related mitigation and engineering expenses, including the monitoring of North Canon Drive closure and maintenance of Public Information Graphics and mural at the sound wall.
RECOMMENDATION
Considering the anticipated work and outreach comments, Staff recommends that City Council approve an additional six-month extension of the temporary closure of North Canon Drive at Wilshire Boulevard until December 31, 2023. Shana Epstein, Director of Public Works
Approved By
Attachment 5
AGENDA REPORT
Meeting Date: November 7, 2023
Item Number:
To: Honorable Mayor & City Council
From: Daren Grilley, Assistant Director of Public Works/City Engineer Christine Chung, Project Manager
Subject: NORTH CAÑON DRIVE CLOSURE EXTENSION
CONSIDERATION
Attachments: 1. June 6, 2023, Staff Report
2. Stakeholder Comments
RECOMMENDATION
Staff recommends that City Council (1) approve an additional one-year extension of the temporary closure of North Cañon Drive at Wilshire Boulevard until December 31, 2024, or sooner when the street closure and soundwall are no longer necessary to mitigate construction impacts in 2024 or alternatively (2) approve an additional six-month extension until June 30, 2024 and each future extension to consider up to six months until September 2025, which is when the closure extension expires.
INTRODUCTION
On July 24, 2018, City Council initially approved the closure of North Cañon Drive for a minimum of two years and up to six years to mitigate the construction impacts of the Los Angeles County Metropolitan Transportation Authority (Metro) Purple (D) Line Extension – Section 2 project.
DISCUSSION
Per Article XII of the MOA with Metro, the street was closed and a cul-de-sac was created in September 2019, followed by the construction of the temporary sound wall across North Cañon Drive at Wilshire Boulevard. City Council approved a mural designed by Tomokazu Matsuyama, which was completed in November 2019. On September 21, 2021, City Council approved a one-year extension of the temporary closure of North Cañon Drive until September 30, 2022. On September 12, 2022, City Council approved a nine-month extension of the temporary closure until June 30, 2023.
BEVERLY
HILLS
-~
BEVERLW
HILLS
d
Meeting Date: November 7, 2023
On June 6, 2023, City Council approved a six-month extension of the temporary closure until December 31, 2023.
The Metro Section 2 project is actively building the station structure along Wilshire Boulevard and began constructing multiple appendage structures at South Beverly Drive and South Cañon Drive in the summer of 2023. The 20-foot-high sound wall has successfully mitigated the noise and dust impacts of these major construction activities.
The closure has also provided a safe and consistent traffic pattern and uninterrupted access for businesses located on North Cañon Drive.
Anticipated Construction in 2024
Within 2024, Metro will continue to set up cranes to access deck panels along Wilshire Boulevard for material deliveries and pump concrete to continue to construct the below ground station’s entrance, concourse level, walls, roof deck, side structures, and other components. For these activities, Wilshire Boulevard between Beverly Drive and Crescent Drive is typically reduced to a minimum of two lanes in each direction during day shifts and a minimum of one lane in each direction during night shifts.
In addition, Metro will continue building multiple appendage structures through 2024.
Appendage structures include various features such as utility rooms, ventilation shafts, and emergency exits. They are located on the north and south sides of Wilshire Boulevard, extending into sidewalks between the alley west of Beverly Drive and Crescent Drive. A couple of appendage structures are located close to the North Cañon Drive intersection and the southeast corner of Cañon Staging Yard. For any substantial continuous traffic closures related to the Section 2 project, Metro will be required to submit a traffic study to verify the minimal impact on the traffic flow along the arterial streets or seek alternative traffic control and/or mitigation options.
If the closure and sound wall remain in place until the end of 2024, traffic patterns will remain consistent. No construction or traffic impacts associated with the North Portal at North Beverly Drive will occur before 2025, at the earliest, based on the preliminary design review. Also, North Beverly Drive will remain accessible with a traffic taper partially extended from South Beverly Drive during the appendage construction. The 20- foot sound wall will continue to mitigate noise, dust, and lighting from construction activities at the Cañon Yard entrance and Wilshire Boulevard. The Public Information Graphics with business wayfinding signs and the sound wall mural will remain in place to beautify the cul-de-sac and Wilshire Boulevard side of the sound wall.
If the closure and sound walls are removed post-December 2023, traffic patterns at North Cañon Drive and Wilshire Boulevard would require daily changes with closures and/or turn restrictions as the station construction continues. With continuous access to the Cañon Yard and other activities along Wilshire Boulevard, implementation of daily traffic control will be necessary along North Cañon Drive as far north as Dayton Way using message boards, detour signage, and/or traffic cones near business entrances, permitted parklets, and valet as well as on-street parking restrictions. Removing the sound wall would also impact pedestrian paths to North Cañon Drive with intermittent sidewalk closures. Noise, dust, and lighting impacts would be more noticeable to businesses on North Cañon Drive. It would also create an irregular traffic pattern as detours must be implemented daily and nightly traffic control, and crane setup for deck access on Wilshire Boulevard and appendage work close to Cañon Yard. Finally, removing the cul-de-sac would increase the chance of Metro heavy construction vehicles driving along North Cañon Drive (though that would violate approved haul routes).
Meeting Date: November 7, 2023
Environmental Considerations
The Final Environmental Impact Report (EIR)/Environmental Impact Statement (EIS) prepared by Metro covers the impacts of North Cañon Drive closure at Wilshire Boulevard until the end of Purple Line Extension – Section 2 construction.
Community Engagement
City and Metro staff completed the following stakeholder meetings and stakeholder outreach to receive feedback on the proposal to extend the North Cañon Drive closure extension until December 2024.
Monthly Chamber of Commerce Stakeholder Meeting held on October 11, 2023 o One stakeholder shared concern about traffic back-up at the parking structures near Dayton Way and Beverly Drive since the closure. Per observation of the garage exits and this intersection between October 12th and 20th, the traffic continues to flow with minimal backup and cars can leave the garages within one traffic signal cycle at the adjacent intersections. BHPD and staff will continue to monitor adjacent intersections to determine if additional mitigation measures are required. o Beverly Hills Chamber of Commerce submitted a letter in support of a sixmonth extension for the City to present findings and changes in the project status to have more transparency related to the temporary closure (Attachment 2).
Staff informed the Next Beverly Hills Committee and the Arts and Culture Commission representatives in October 2023; no objection was received. One-on-one contacts made with stakeholders located along North Cañon Drive between Wilshire Boulevard and North Santa Monica Boulevard between March and May 2023. Some of the stakeholders include the Maybourne Beverly Hills, 9401 Wilshire, Spago, Nusr-Et, Hilton & Hyland, Brickstar Capital, Canon Properties, Mastro’s, Rodeo Realty, and 190 N Cañon Dr. Fred Hayman Building.
Overall, no objection was received on the extension. 9401 Wilshire shared support of the one-year extension of the closure (Attachment 2) and Brickstar Capital rep, David Mirahooni, verbally commented that he supports a six-month extension.
Cañon Drive Closure extension notices were hand-delivered to the residents and businesses bound by South Santa Monica Boulevard, North Cañon Drive, Dayton Way, Rexford Drive, Camden Drive, and Olympic Boulevard on October 20, 2023. Links to this notice and upcoming City Council meeting agenda items were posted on both the City and Metro websites and shared on social media platforms. No comments or questions were received.
Overall, staff has received support and/or no objection to the extension request from the residential and business communities. Based on the feedback received from stakeholders, staff included an alternative recommendation to consider a six-month extension until June 30, 2024 and each future extension to consider up to six months until September 2025, which is when the closure extension expires.
Meeting Date: November 7, 2023
Next Steps
If the extension of the closure is approved for either six-month or one-year, staff will continue maintenance of the mural and Public Information Graphics on the sound wall and the landscaped planters to keep the cul-de-sac aesthetically pleasing. Staff will also monitor community concerns and work with Metro and appropriate City departments to mitigate any North Cañon Drive closure-related concerns or consider earlier re-opening of North Cañon Drive depending on the project progress. Near the expiration date of the closure, staff will provide updates on the Purple Line project to City Council to consider whether to further extend the temporary closure of North Cañon Drive at Wilshire Boulevard.
If this item is not approved, staff will schedule to remove the mural and coordinate with Metro to remove the temporary sound wall. With this decision, Public Works staff will coordinate with OpenBH staff and stakeholders to amend the outdoor dining permits to include necessary traffic control or other measures to avoid conflicts with construction activities near the dining parklet.
FISCAL IMPACT
There is no direct fiscal impact associated with approving this request. Per the MOA, Metro is to pay for the installation and removal of the sound wall and other work associated with the closure, as well as reimburse the City for its associated costs.
Funds are available in the approved budget for CIP No. 00050 for Metro project-related mitigation and engineering expenses, including the monitoring of North Cañon Drive closure and maintenance of Public Information Graphics and mural at the sound wall.
Shana Epstein,
Director of Public Works
Approved By
Attachment 6
AGENDA REPORT
Meeting Date: May 21, 2024
Item Number:
To: Honorable Mayor & City Council
From: Daren Grilley, Assistant Director of Public Works/City Engineer Christine Chung, Project Manager
Subject: NORTH CAÑON DRIVE CLOSURE EXTENSION
CONSIDERATION
Attachments: 1. July 24, 2018, Staff Report
2. September 21, 2021, Staff Report (without attachments)
3. September 12, 2022, Staff Report (without attachments)
4. June 6, 2023, Staff Report (without attachments)
5. November 7, 2023, Staff Report (without attachments)
6. Stakeholder Comments
RECOMMENDATION
Staff recommends that City Council approve an additional six-month extension of the temporary closure of North Cañon Drive at Wilshire Boulevard until December 31, 2024.
INTRODUCTION
On July 24, 2018, City Council approved the closure of North Cañon Drive for a minimum of two years and up to six years to mitigate the construction impacts of the Los Angeles County Metropolitan Transportation Authority (Metro) Purple (D) Line Extension – Section 2 project (Attachment 1). Per Article XII of the MOA with Metro, the street was closed and a cul-de-sac was created in September 2019, followed by the construction of the temporary sound wall with a mural designed by Tomokazu Matsuyama across North Cañon Drive at Wilshire Boulevard. The temporary street closure with the sound wall is currently in place through June 2024 and, per the original approval in 2018, may be continued until September 2025 with City Council approval.
DISCUSSION
On September 21, 2021, City Council approved a one-year extension of the temporary closure of North Cañon Drive until September 30, 2022 (Attachment 2). On September
BEVERLY
HILLS
-~
BEVERLW
HILLS
d
Meeting Date: May 21, 2024
12, 2022, City Council approved a nine-month extension of the temporary closure until June 30, 2023 (Attachment 3). On June 6, 2023, City Council approved a six-month extension until December 31, 2023 (Attachment 4). On November 7, 2023, City Council approved a six-month extension until June 30, 2024 (Attachment 5).
Metro Section 2 construction is near completion of the underground main station structures along Wilshire Boulevard. In addition, multiple appendage structures at South Beverly Drive and South Cañon Drive have been under construction since summer of 2023 and near the alley within the Cañon Staging Yard east of North Cañon Drive since early 2024. The 20-foot-high sound wall has successfully mitigated the noise, dust, and traffic control disruption impacts of these major construction activities. The closure has also provided a safe and consistent traffic pattern and uninterrupted access for businesses located on North Cañon Drive.
Anticipated Construction in 2024
Within 2024, Metro will continue to set up cranes to access deck panels along Wilshire Boulevard for material deliveries and pump concrete to continue to construct below ground station’s entrance, roof deck, side structures, and other components. For these activities, Wilshire Boulevard between Beverly Drive and Crescent Drive is typically reduced to a minimum of two lanes in each direction during day shifts and a minimum of one lane in each direction during night shifts.
In addition, Metro will continue building multiple appendage structures through 2024 and 2025. Appendage structures include various features such as utility rooms, ventilation shafts, and emergency exits. They are located on the north and south sides of Wilshire Boulevard, extending into sidewalks between the alley west of Beverly Drive and Crescent Drive. A couple of appendage structures are located close to the North Cañon Drive and Wilshire Boulevard intersection and the southwest corner of Cañon Staging Yard. For any substantial continuous traffic closures related to the Section 2 project, Metro will be required to submit a traffic study to verify the minimal impact on the traffic flow along the arterial streets or seek alternative traffic control and/or mitigation options.
If the closure and sound wall remain in place until the end of 2024, traffic patterns will remain consistent. North and South Beverly Drive will remain accessible in both directions with intermittent traffic taper or soft closure of the southbound curb lane during multiple appendage construction near Beverly Drive. During this summer, the City plans to add an east crosswalk at the intersection of Wilshire Boulevard and Crescent Drive, and Crescent Drive will remain open in both directions with intermittent soft closure of the northbound curb lane. The 20-foot sound wall will continue to mitigate noise, dust, traffic control disruptions, and lighting from construction activities at the Cañon Yard entrance and Wilshire Boulevard. The Public Information Graphics with business wayfinding signs and the sound wall mural will remain in place to beautify the cul-de-sac and Wilshire Boulevard side of the sound wall.
If the closure and sound walls are removed post-June 2024, traffic patterns at North Cañon Drive and Wilshire Boulevard would require daily changes with closures and/or turn restrictions as the station construction continues. With continuous access to the Cañon Yard, daily access through the deck, and other activities along Wilshire Boulevard, implementation of daily traffic control will be necessary along North Cañon Drive as far north as Dayton Way using message boards, detour signage, and/or traffic cones near business entrances, permitted parklets, and valet as well as on-street parking restrictions. Removing the sound wall would also impact pedestrian paths to Meeting Date: May 21, 2024
North Cañon Drive with intermittent sidewalk closures. Noise, dust, and lighting impacts would be more noticeable to businesses on North Cañon Drive. It would also create an irregular traffic pattern as detours must be implemented daily and nightly traffic control, and crane setup for deck access on Wilshire Blvd and appendage work close to Cañon Yard. Finally, removing the cul-de-sac would increase the chance of Metro heavy construction vehicles driving along North Cañon Drive (though that would violate approved haul routes).
Environmental Considerations
The Final Environmental Impact Report (EIR)/Environmental Impact Statement (EIS) prepared by Metro covers the impacts of North Cañon Drive closure at Wilshire Boulevard until the end of Purple Line Extension – Section 2 construction.
Community Engagement
City staff completed the following stakeholder meetings and outreach to receive feedback on the proposal to extend the North Cañon Drive closure extension until December 2024.
Staff presented at the Monthly Chamber of Commerce Stakeholder Meeting on April 10, 2024; the Chamber shared a letter of support for the six-month closure extension on May 1, 2024.
Staff presented at the Beverly Hills Chamber of Commerce Government Affairs Committee meeting on April 11, 2024; no objection was received. Staff informed the Next Beverly Hills Committee and the Arts and Culture Commission representatives in April 2024; no objection was received. One-on-one contacts were made with stakeholders located along North Cañon Drive between Wilshire Boulevard and North Santa Monica Boulevard between April and May 2024. Some of the stakeholders include the Maybourne Beverly Hills, 9401 Wilshire, Spago, Nusr-Et, Hilton & Hyland, Brickstar Capital, Canon Properties, Mastro’s, Rodeo Realty, and 190 N Cañon Dr. Fred Hayman Building.
Overall, no objection was received to this 6-month extension until December 31, 2024.
Attachment 6 includes stakeholder comments. 9401 Wilshire and Spago shared support for the six-month extension of the closure. Canon Properties, while not opposing the six-month extension within the current timeframe, conveyed that they oppose any further extension beyond the end of 2024 due to the lease of 166 N. Cañon Drive, which is located just north of the sound wall. If an additional extension of the closure is considered in 2025, staff will explore alternative or additional mitigation options that might accommodate the visibility of the 166 N.
Cañon Drive building while maintaining construction mitigations. Cañon Drive Closure extension notices were hand-delivered to the residents and businesses bound by South Santa Monica Boulevard, North Cañon Drive, Dayton Way, Rexford Drive, Camden Drive, and Olympic Boulevard on May 1, 2024. These same notices were emailed to the City’s contact database on May 3, 2024. Links to this notice and upcoming City Council meeting agenda items Meeting Date: May 21, 2024
were posted on the City website and shared on social media platforms. No comments or questions were received.
Overall, staff has received support and/or no objection to the 6-month extension until December 2024 request from the residential and business communities.
Next Steps
If the extension of the closure is approved, staff will continue maintenance of the mural and Public Information Graphics on the sound wall and the landscaped planters to keep the cul-de-sac aesthetically pleasing. Staff will also monitor community concerns and work with Metro and appropriate City departments to mitigate any North Cañon Drive closure-related concerns or consider earlier re-opening of North Cañon Drive depending on the project progress. Near the expiration date of the closure, staff will provide updates on the Purple Line project to City Council to consider whether to further extend the temporary closure of North Cañon Drive at Wilshire Boulevard.
If this item is not approved, staff will schedule to remove the mural and coordinate with Metro to remove the temporary sound wall. With this decision, Public Works staff will coordinate with OpenBH staff and stakeholders to amend the outdoor dining permits to include necessary traffic control or other measures to avoid conflicts with construction activities near the dining parklet.
FISCAL IMPACT
There is no direct fiscal impact associated with approving this request. Per the MOA, Metro is to pay for the installation and removal of the sound wall and other work associated with the closure, as well as reimburse the City for its associated costs.
Funds are available in the approved budget for CIP No. 00050 for Metro project-related mitigation and engineering expenses, including the monitoring of North Cañon Drive closure and maintenance of Public Information Graphics and mural at the sound wall.
Shana Epstein,
Director of Public Works
Approved By
Attachment 7
AGENDA REPORT
Meeting Date: November 7, 2024
Item Number:
To: Honorable Mayor & City Council
From: Daren Grilley, Assistant Director of Public Works/City Engineer Christine Chung, Project Manager
Subject: NORTH CAÑON DRIVE CLOSURE EXTENSION
CONSIDERATION
Attachments: 1. July 24, 2018, Agenda Report
2. September 21, 2021, Staff Report (without attachments)
3. September 12, 2022, Staff Report (without attachments)
4. June 6, 2023, Staff Report (without attachments)
5. November 7, 2023, Agenda Report (without attachments)
6. May 21, 2024, Agenda Report (without attachments)
7. Stakeholder Comments
RECOMMENDATION
Staff recommends that City Council approve an additional nine-month extension of the temporary closure of North Cañon Drive at Wilshire Boulevard until September 30, 2025.
INTRODUCTION
On July 24, 2018, City Council approved the temporary closure of North Cañon Drive for a minimum of two years and up to six years to mitigate the construction impacts of the Los Angeles County Metropolitan Transportation Authority (Metro) Purple (D) Line Extension – Section 2 project (Attachment 1). Per Article XII of the Memorandum of Agreement (MOA) with Metro, the street was closed, and a cul-de-sac was created in September 2019. A temporary sound wall featuring a mural by Tomokazu Matsuyama was also constructed across North Cañon Drive at Wilshire Boulevard. The current street closure with the sound wall is approved until December 2024, with the potential for an extension until September 2025, pending City Council approval.
BEVERLY
HILLS
-~
BEVERLW
HILLS
d
Meeting Date: November 7, 2024
DISCUSSION
On September 21, 2021, City Council approved a one-year extension of the temporary closure of North Cañon Drive until September 30, 2022 (Attachment 2). On September 12, 2022, City Council approved a nine-month extension of the temporary closure until June 30, 2023 (Attachment 3). Subsequent six-month extensions were approved on June 6, 2023, until December 31, 2023 (Attachment 4); on November 7, 2023, until June 30, 2024 (Attachment 5); and on May 21, 2024, until December 31, 2024 (Attachment 6).
Construction for Metro Section 2 is nearing completion with underground main station structures ready for backfill along Wilshire Boulevard. Key appendage structures at South Beverly Drive and the Cañon Staging Yard are expected to be finished by early 2025. Work on appendage structures along Wilshire Boulevard has also commenced in September 2024. The 20-foot-high sound wall has effectively mitigated noise, dust, and traffic disruptions, while ensuring safe and uninterrupted access for businesses on North Cañon Drive.
Anticipated Construction in 2025
In 2025, Metro will initiate the significant task of removing deck panels and restoring Wilshire Boulevard between Beverly Drive and Crescent Drive. This will necessitate full weekend closures of Wilshire Boulevard, expected to span up to 13 consecutive weekends per the allowable MOA conditions. Weekday activities will also include utility relocations, temporary and permanent civil restoration, and other infrastructure work, which may require installation of K-rails and reduction of Wilshire Boulevard to two lanes in each direction in the long-term.
Appendage structures and the station entrance construction will continue throughout 2025 with features such as emergency exits and ventilation shafts located on both sides of Wilshire Boulevard. A couple of appendage structures are located close to the North Cañon Drive and Wilshire Boulevard intersection. Metro will be required to conduct traffic studies for any new significant closures to minimize impacts on arterial streets.
If the closure and sound wall remain in place until September 2025, they will continue to mitigate construction impacts, ensuring access to adjacent streets. North and South Beverly Drive will remain open in both directions, though there will be intermittent traffic modifications during construction. A full weekend closure of the Wilshire Boulevard and Beverly Drive intersection will be necessary during deck removal. Additionally, in early 2025, the City plans to add an east crosswalk at the intersection of Wilshire Boulevard and Crescent Drive, while maintaining traffic flow in both directions on Crescent Drive.
The 20-foot sound wall would continue to alleviate noise, dust, traffic control disruptions, and lighting from construction activities at the Cañon Yard entrance and Wilshire Boulevard. The Public Information Graphics with business wayfinding signs and the sound wall mural will remain in place to beautify the cul-de-sac and Wilshire Boulevard side of the sound wall.
If the closure and sound walls are removed post-December 2024, the traffic patterns would be unpredictable and the intersection of North Cañon Drive and Wilshire Boulevard would require daily changes with closures and/or turn restrictions as the station construction continues and during the full closure over the 13-weekend deck removal. With continuous access to the Cañon Yard, station construction, street restoration, and other activities, implementation of daily traffic control will be necessary Meeting Date: November 7, 2024
along North Cañon Drive as far north as Dayton Way using message boards, detour signage, and/or traffic cones near business entrances, and valet as well as on-street parking restrictions. Removing the sound wall would also impact pedestrian paths to North Cañon Drive with intermittent sidewalk closures. Noise, dust, and lighting impacts would be more noticeable to businesses on North Cañon Drive. It would also create an irregular traffic pattern as detours must be implemented daily and nightly traffic control, full closure of Wilshire Boulevard over weekends, and appendage work close to Cañon Yard. Finally, removing the cul-de-sac would increase the chance of Metro heavy construction vehicles driving along North Cañon Drive (though that would violate approved haul routes).
City Council Ad Hoc
On November 1, 2024, the Metro Ad Hoc Committee, which includes Mayor Friedman and Councilmember Wells, was briefed on the North Cañon Drive closure extension recommendation and anticipated Metro construction in 2025. Based on the anticipated work impacts and benefits of the closure and soundwall to the community, the Ad Hoc Committee concurred with the staff recommendation to extend the closure for nine months until September 2025 during the City Council meeting scheduled for November 7, 2024.
Environmental Considerations
The Final Environmental Impact Report (EIR)/Environmental Impact Statement (EIS) prepared by Metro covers the impacts of North Cañon Drive closure at Wilshire Boulevard until the end of Purple Line Extension – Section 2 construction.
Community Engagement
City staff completed the following stakeholder meetings and outreach to receive feedback on the proposal to extend the North Cañon Drive closure extension until September 2025.
Staff presented at the Monthly Chamber of Commerce Stakeholder Meeting on October 10, 2024; the Chamber shared a letter of support for the nine-month closure extension on October 30, 2024. Additionally, the Chamber shared a condition that no further extension to be granted beyond September 2025. Staff presented at the Beverly Hills Chamber of Commerce Government Affairs Committee (GAC) meeting on October 10, 2024; the GAC supported a ninemonth closure extension. Staff informed the Next Beverly Hills Committee and the Arts and Culture Commission representatives in October 2024; no objection was received. Staff informed the Rodeo Drive Committee and the Beverly Hills Conference & Visitors Bureau representatives in October 2024; no objection was received. One-on-one contacts were made with stakeholders located along North Cañon Drive between Wilshire Boulevard and North Santa Monica Boulevard in October 2024. Some of the stakeholders include the Maybourne Beverly Hills, 9401 Wilshire, Spago, Nusr-Et, Hilton & Hyland, Brickstar Capital, Canon Properties, Mastro’s, Rodeo Realty, and 190 N Cañon Drive – Fred Hayman Building.
Meeting Date: November 7, 2024
Attachment 7 includes stakeholder comments. 9401 Wilshire, Spago, and Fred Hayman Building supported the nine-month extension. Canon Properties did not oppose the nine-month extension, and staff responded to their questions about construction progress and the existing soundwall. Brickstar Capital recommended a six-month extension for transparent and continuous updates of the construction. Metro and City staff will provide construction and traffic updates at the monthly Chamber of Commerce key stakeholder meeting. Overall, the stakeholders supported the closure extension.
Cañon Drive Closure extension notices were mailed to the residents and businesses bound by South Santa Monica Boulevard, Wilshire Boulevard, Camden Drive, Olympic Boulevard, and Rexford Drive on October 18, 2024.
These same notices were emailed to the City’s contact database in October 2024. Links to this notice and upcoming City Council meeting agenda items were posted on the City website and shared on social media platforms. No comments or questions were received.
Metro’s November lookahead notices were handed out to the residents and businesses bound by Wilshire Boulevard, Camden Drive, Olympic Boulevard, Hamel Drive, Rexford Drive, South Santa Monica Boulevard, and Crescent Drive on October 31, 2024.
Overall, staff has received support and no objections from the residential community and the majority of business community regarding the request for a nine-month extension until September 2025.
Next Steps
Given the anticipated increase in above-ground construction activity in 2025, staff recommends extending the closure for the maximum allowable period, until September 2025, to mitigate impacts on businesses. Should the extension be approved, staff will maintain the sound wall mural and monitor community concerns, coordinating with Metro and relevant City departments to address any issues. Near the closure's expiration, staff will update City Council on project progress to determine the appropriate timing for reopening North Cañon Drive.
If this item is not approved, staff will schedule the removal of the mural and coordinate with Metro to remove the temporary sound wall. Staff will also coordinate with the permit department and stakeholders to amend any open permits to include necessary traffic control or other measures to avoid conflicts with construction activities near the restaurants and other businesses.
FISCAL IMPACT
There is no direct fiscal impact associated with approving this request. Per the MOA, Metro is to pay for the installation and removal of the sound wall and other work associated with the closure, as well as reimburse the City for its associated costs.
Meeting Date: November 7, 2024
Funds are available in the approved budget for CIP No. 00050 for Metro project-related mitigation and engineering expenses, including the monitoring of North Cañon Drive closure and maintenance of Public Information Graphics and mural at the sound wall.
Shana Epstein,
Director of Public Works
Approved By
Attachment 8
June 13, 2025 Metro Unifier Record No. 01745
City of Beverly Hills
345 Foothill Road
Beverly Hills, CA 90210
Attention: Mr. Daren Grilley
Reference: Purple Line Extension Section 2 Project
Metro and City of Beverly Hills Memorandum of Agreement (MOA) Subject: Request to Postpone the North Canon Drive Sound Wall Removal Date Dear Mr. Grilley,
Metro is requesting to postpone the removal date for North Canon Drive sound wall from the currently agreed upon date of September 2025 to a future date to be aligned with the forecasted completion date of Beverly Dr Station (BDS) construction activities (currently set for March 2026). Metro’s justification for this postponement request is presented below:
• In September 2025, the construction of the Station Entrance Plaza (Reeves Yard) will be nearly completed, thereby removing the availability of this area for staging of project materials and equipment. Additionally, to minimize the risk of damage to the soon-to-be-finished tile pavers and artwork, Reeves Yard will no longer be used as a staging area. The North Canon Yard will become the main staging area for the entire BDS work.
• Concrete placement for the tunnel track work will continue to be staged in the North Canon Yard.
All equipment and permanent materials to service the BDS construction from September 2025 until the end of construction will need to be staged in the North Canon Yard. • The streetscape construction, including the sidewalk restoration on the north side of Wilshire Boulevard from the AKA Alley to North Canon Drive, is scheduled to start on August 2025. This will eliminate the construction access to the North Canon Yard staging area from Wilshire Blvd, further limiting access in and out of the yard to the entrance gate at the ‘triangle’ area. Access to North Canon will remain limited from August 2025 until demobilization of the staging area and during preparations to complete North Canon Drive street restoration and streetscape. North Canon Drive restoration work is anticipated to start in March 2026.
It should be noted that opening North Canon Drive in September 2025 would require construction vehicles to make left turns while exiting the North Canon Yard at an unsignalized and potentially unsafe intersection due to limited sight distance. The North Canon Drive closure facilitates safer entry/exit to the yard, both day and night shift, by eliminating car movements conflicting with trucks and equipment at the West entrance. Metro has explored alternative approaches that would enable the removal of the sound wall and reopen the North Canon Drive in either a full or partial configuration but was unable to find an alternative approach that is safe for construction operations, pedestrians and drivers traversing the area.
Therefore, Metro requests that the North Canon Drive sound wall remain in place and continue to successfully provide a safe and consistent traffic pattern, mitigate construction noise, and dust until the completion of the Beverly Dr Station major construction activities (currently forecast to be March 2026).
Los Angeles County
Metropolitan Transportation Authority
Metro
One Gateway Plaza
Los Angeles, CA 90012-2952
213.922.2000 Tel
metro.net
Mr. Daren Grilley
Request for the Extension of the North Canon Drive Sound Wall Removal Date June 13, 2025
Sincerely,
Zephaniah Varley
Senior Executive Officer, (Interim) Project Management
Purple Line Extension Section 2 Project
cc: Ayokunle Ogunrinde – Metro
Kim Chan – Metro
Gregg Davidson – Metro
Document Control File
Attachment 9
August 27, 2025
Honorable Mayor and City Council
Beverly Hills City Hall
455 N. Rexford Drive
Beverly Hills, CA 90210
Dear Honorable Mayor Nazarian and Members of the City Council:
The Beverly Hills Chamber of Commerce (Chamber) writes to you in support of a request by the Los Angeles County Metropolitan Transportation Authority (MTA) to extend the closure of North Canon Drive at Wilshire. Specifically, the Chamber supports a proposed arrangement worked out between the City and MTA to allow one final extension of the closure and to require Canon Drive to reopen no later than March 14, 2026.
The Beverly Hills City Council approved the closure of Canon Drive and creation of a sound wall in July 2018 to mitigate the impact of construction of the D Line subway extension and a wall was subsequently constructed. Since then, the Council has approved several extensions of the closure and wall with the most recent extension due to expire in September of this year.
The Chamber supports the City staff’s recommendation to permit one last extension of the North Canon Drive street closure and requiring Canon Drive to reopen by March 14 of next year and making it clear that no further extensions will be granted. This will allow construction to be completed more efficiently while providing protection to the businesses along that corridor and predictability to commuters and other travelers.
We look forward to MTA and its contractor timely and efficiently completing subway construction and to the planned opening of the subway station at Wilshire/Beverly Drive in short order. Thank you.
Todd Johnson
President and CEO
Beverly Hills Chamber of Commerce
BH Chamber of Commerce
CHAMBER
--ef--
COMMERCE
Comment from Wilshire Business
8/29/25, 8:46 AM
outlook
Mail - Christine Chung - Outlook
Re: Metro's Request to Extend closure of North Canon Drive From Dar Mahboubi
Date Thu 8/28/2025 8:18 PM
To Shana Epstein <[email protected] >
Cc 12-Sharona Nazarian <[email protected] >; Nancy Hunt-Coffey < [email protected]>; Ryan Gohlich <[email protected]>; Daren Grilley <[email protected]>; Christine Chung <[email protected]>
A CAUTION: EXTERNAL SENDER A
Be cautious when clicking links or opening attachments. Verify the sender's email address and be on the lookout for phishing attempts.
Please accept my gratitude
dar
On Aug 28, 2025, at 7:05 PM, Shana Epstein <[email protected]> wrote:
We will make sure your concerns are shared at the City Council meeting on Sept 9th.
Shana Epstein
Sent from my iPhone
On Aug 28, 2025, at 5:26 PM, Dar Mahboubi
EXTERNAL SENDER A
wrote:
A CAUTION:
Be cautious when clicking links or opening attachments.
Verify the sender's email address and be on the lookout for phishing attempts.
Dear Shana:
https://outlook.office.com/mail/inbox/id/AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AdJldtl5Wr0OVKdK7h7jrlQAC5H2zzAAA?nativeVersion=... 1/4 8/29/25, 8:46 AM Mail - Christine Chung - Outlook
The closure of Canon Drive has been of great inconvenience to residents, visitors, and shoppers in addition to loss of business to merchants. 1- Merchants, one by one, do not have access to affordable legal resources to fight the Metro.
2- Metro spends over a $100 million per year in legal fees to fight claims filed against Metro. Their attorneys are extremely aggressive.
All I am asking is as follows:
Either the City of Beverly Hills should deny Metro's request for extension or alternatively represent the best interests of our merchants.
I don't think that's an unreasonable request. After all you and all of our elected representatives and officials in charge of various departments are working to protect our best interests not Metro's.
Res pectfu I ly,
dar Mahboubi
On Aug 26, 2025, at 5:55 PM, Shana Epstein
<[email protected]> wrote:
Good evening Mr. Mahboubi,
Thank you for sharing your concerns. The Canon Closure being extended through March 14, 2026, has provisions that the closure will be completely removed and ingress and egress to that the Canon Construction Yard will be on Wilshire only. These considerations insure that when Canon opens it will really open and will have proper mitigation from the continued construction.
Metro does offer support to small businesses that may be impacted by the construction. Please follow this link to the resources. There are also resources on a connected page to file claims for direct damages to property.
If you have any additional questions, we are happy to answer them. My phone number is below my signature.
Sincerely,
Shana Epstein
Director
Public Works
City of Beverly Hills
Beverly Hills, CA 90210
Direct: 310.285.2494
Email: [email protected]
This message contains information which may be privileged, confidential and intended only for the addressee. If the reader of this message is not the intended https://outlook.office.com/mail/inbox/id/AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AdJldtl5Wr0OVKdK7h7jrlQAC5H2zzAAA?nativeVersion=... 2/4 8/29/25, 8:46 AM Mail - Christine Chung - Outlook
recipient, or the employee or agent responsible for delivering the message to the intended recipient, you are herby notified that any use, dissemination, distribution or reproduction of this communication, or any part thereof, is strictly prohibited.
If you have received this message in error, please advise the sender by reply email and delete the message.
From: 12-Sharona Nazarian <[email protected]>
Sent: Monday, August 25, 2025 7:21 PM
To: Dar Mahboubi Nancy Hunt-Coffey
<[email protected]>; Shana Epstein
<[email protected]>
Subject: Re: Metro's Request to Extend closure of North Canon Drive Dear Dar,
Thank you for your email. I am including our City Manager to assist you with this process.
Best regards,
Sharona R. Nazarian, PsyD
Mayor
City of Beverly Hills
455 N. Rexford Drive
Beverly Hills, CA 90210
P: (310) 285-1013
[email protected]
<image001.jpg >
<image002.jpg>
https://www.instagram.com/sharona4bh/
<image003.jpg>
https://x.com/sharona4bh
< i mage004.j pg>
https://www.facebook.com/sharona4bh
From: Dar Mahboubi
Sent: Monday, August 25, 2025 5:56:59 PM
To: 12-Sharona Nazarian <[email protected]>
Subject: Metro's Request to Extend closure of North Canon Drive https://outlook.office.com/mail/inbox/id/AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AdJldtl5Wr0OVKdK7h7jrlQAC5H2zzAAA?nativeVersion=... 3/4 8/29/25, 8:46 AM Mail - Christine Chung - Outlook
You don't often get email from
Learn why_this is important
A CAUTION: EXTERNAL SENDER A
Be cautious when clicking links or opening attachments. Verify the sender's email address and be on the lookout for phishing attempts.
Dear Mrs. Mayor:
Regarding Metro:
We're being too nice and too accommodating to Metro's
requests. They've caused irreparable damage to businesses north of Wilshire between Crescent and Camden. It would not be unreasonable to request that they compensate $10,000 per business for this additional disruption. The City Council's mandate is to protect its residents and businesses. Enough is enough. They keep asking for extensions because the
contractor makes tens of millions on change orders.
Respectfu Ily,
dar Mahboubi
The City keeps a copy of all E-mails sent and received
for a minimum of 2 years. All retained E-mails will be
treated as a Public Record per the California Public
Records Act, and may be subject to disclosure pursuant
to the terms, and subject to the exemptions, of that
Act.
The City keeps a copy of all E-mails sent and received for a minimum of 2 years. All retained E-mails will be treated as a Public Record per the California Public Records Act, and may be subject to disclosure pursuant to the terms, and subject to the exemptions, of that Act. https://outlook.office.com/mail/inbox/id/AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AdJldtl5Wr0OVKdK7h7jrlQAC5H2zzAAA?nativeVersion=... 4/4