AGENDA REPORT
Meeting Date: December 16, 2025
Item Number:

To: Honorable Mayor & City Council
From: Mandana Motahari, City Architect
Subject: AMENDMENT NO. 1 TO THE AGREEMENT BETWEEN THE CITY

OF BEVERLY HILLS AND BROSKIN, LLC FOR DESIGN
SERVICES FOR THE OCTOBER 7TH MEMORIAL MONUMENT;
AND
Attachment: 1. Amendment No. 1

2. Rendering

RECOMMENDATION
Staff recommends that City Council approve Amendment No. 1 to the Agreement between the City of Beverly Hills and Broskin, LLC for additional architectural and engineering services for design of the October 7th memorial monument and approval of a change purchase order in the amount of $116,350. The total amount of the original agreement and the amendment is a not-to-exceed amount of $216,100. Staff also recommends that Council approve a one-time appropriation from the General Fund committed fund balance of $500,000 to fund a portion of this project.

INTRODUCTION
City Council has been steadfast in its support of Israel and the creation of a permanent memorial dedicated to the hundreds of victims from numerous countries from the brutal attack by Hamas on October 7, 2023. Through an RFP process, five firms were selected to present their design concept, after a series of interviews with designers/artists/architects with the goal of selecting a design for the October 7th Permanent Memorial.

BEVERLV
HILLS
di

APPROVAL OF A CHANGE PURCHASE ORDER IN THE AMOUNT
OF $116,350 FOR A TOTAL NOT-TO-EXCEED AMOUNT OF
$216,100; AND

APPROVAL OF A ONE-TIME APPROPRIATION FROM THE
GENERAL FUND COMMITTED FUND BALANCE OF $500,000
Meeting Date: December 16, 2025

Page 2 of 3 ends

After careful consideration, on August 19, 2025, the Committee recommended to City Council the selection of 40 Steps to the Sky: A Memorial of Light and Memory by Broskin, LLC (formerly Archillusion Design Studio/C.I. Form), and City Council unanimously approved of the design concept. On October 5, 2025, a site dedication ceremony was conducted, and the proposed design was presented to members of the community and received exceptional support.

DISCUSSION
The architectural and engineering design services of Broskin, LLC were engaged, and the architect and his engineering team started preparing schematic design documents based on the approved conceptual design. The original contract with Broskin, LLC in the amount of $99,750 included preparing schematic design and design development documents as well as fabrication of a mockup of one of the main design elements (a Step) made of glass and stainless steel.

The design development documents are near completion. The proposed development includes the main memorial plaza and the monument (1,500 SF) as well as site development of 9,200 SF surrounding the plaza. The memorial plaza includes the October 7th memorial monument in a water fountain basin with scriptures and a wall commemorating the victims with carved names. The surrounding site development area includes a series of curvilinear site walls creating significant areas for donor walls and integrated benches, landscape and hardscape area, and site lighting.

To get the project started right away, staff engaged the services of Broskin, LLC to work on phase one of the design and prepare schematic and design development packages.

The original agreement is in the amount of $96,400, which included a reduced designer fee of $29,800; the amendment to the Broskin, LLC contract for additional professional services in the amount of $104,080 will include architectural and engineering services for preparation of construction and bid documents, assistance during bidding and construction administration services during the construction phase.

The total not-to-exceed amount of $216,100 for the original agreement and Amendment No. 1 includes a reimbursable expenses amount of $8,500 for mockup fabrications and $7,120 in contingency for any design services beyond the scope of work.

The bid documents are scheduled to be completed in approximately mid-January. The Broskin, LLC team currently estimates the project cost of the memorial to be approximately $1.55 million, including this $0.2 million in design costs. Staff is currently working with professional cost estimators to provide estimates of probable costs based on the design development package. However, it should be noted that a final cost cannot be determined until formal bid drawings are prepared.

Staff is currently in the process of pre-qualifying contractors for the construction phase of the project.

The October 7th Permanent Memorial Ad Hoc has met and will meet again to discuss raising additional funds for the memorial. Once the fundraising program has been finalized, it will be brought to City Council for approval. The Beverly Hills Community Charitable Foundation will play a role in fundraising and accepting donated funds. It is anticipated that donations will supplement costs beyond the City’s available $500,000 fund for the construction of the memorial monument and surrounding site improvements.

Meeting Date: December 16, 2025

Page 3 of 3 ends

FISCAL IMPACT
City Council has committed $500,000 of City funds to be used toward the October 7th permanent memorial, and it is recommended that Council provides direction to appropriate this amount from the General Fund committed fund balance. The funds will be transferred to newly created CIP 00107 in Fund 405, where the memorial construction activity will be managed.

On June 17, 2025, City Council approved the Fiscal Year 2025-26 Capital and Operating Budgets, which indicated potential financial challenges on the horizon, including forecasted deficits within the next five years. The forecasted General Fund operating surplus of $1.9 million was projected before one-time public benefit contributions of $10.0 million. The chart below displays the adjusted forecasted General Fund results for Fiscal Year 2025-26 incorporating both approved and proposed mid-year appropriations. $ 1,944,997
Less Approved and Proposed Mid-Year Appropriations (717,700) $ 1,227,297 Date Agenda Item Council Mid-Year
Appropriations
7/15/2025 Fully Burdened Cost to Add Program Operations Specialist in the Fire Department 92,610 $ 8/5/2025 Appropriation to Fund Police Management Association MOU 82,000 8/19/2025 Salary Schedule Updates (General Fund portion) 4,000 9/30/2025 Salary Schedule Updates (General Fund portion) 39,090 12/16/2025 Appropriation to Fund the October 7th Memorial (Pending) 500,000 $ 717,700 General Fund Summary
Fiscal Year 2025-26 Projected Surplus before One-Time Public Benefit Contributions [1] Net Impact on General Fund Unassigned Reserves or Additional Use of One-Time Public Benefit Contributions
Fiscal Year 2025-26 Mid-Year General Fund Appropriations Approved by Council [1] Excludes $10.0 million in anticipated one-time public benefit contributions to be considered for earmark towards Committed Fund Balance.

Jeff Muir,
Director of Finance
Shana Epstein,
Director of Public Works
Approved By Approved By
Attachment 1
1 B0785-0001\3193232v1.doc
AMENDMENT NO. 1 TO THE AGREEMENT BETWEEN THE

CITY OF BEVERLY HILLS AND BROSKIN, LLC FOR DESIGN
SERVICES FOR THE OCTOBER 7TH MEMORIAL MONUMENT
NAME OF CONSULTANT: Broskin, LLC
RESPONSIBLE PRINCIPAL Artur Nesterenko, Partner
OF CONSULTANT:

CONSULTANT'S ADDRESS: 6100 Wilshire Boulevard, Suite 1250 Los Angeles, CA 90048
Attention: Artur Nesterenko, Partner
CONSULTANT’S E.I.N./TAX I.D. NO.: 92-0699822
CITY'S ADDRESS: City of Beverly Hills
345 Foothill Road
Beverly Hills, CA 90210
Attention: Director of Public Works
COMMENCEMENT DATE: September 1, 2025
TERMINATION DATE: December 31, 2026, unless extended pursuant to Section 2 (original termination date)
CONSIDERATION: Original Agreement:

Professional fees not to exceed $96,400.00;
Reimbursable expenses not to exceed $3,350.00
Total Not to Exceed: $99,750.00, as described in
Exhibit B
Amendment No.1: Additional Professional Fees not
to exceed $104,080.00
Additional Reimbursable expenses: $5,150.00
Contingency: $7,720.00
Total not to exceed $216,100.00 as described in
Exhibit B

Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C 2 AMENDMENT NO. 1 TO THE AGREEMENT BETWEEN THE

CITY OF BEVERLY HILLS AND BROSKIN, LLC FOR DESIGN
SERVICES FOR THE OCTOBER 7TH MEMORIAL MONUMENT
This Amendment No. 1 is to that certain Agreement between the City of Beverly Hills (hereinafter called "CITY"), and Broskin, LLC (hereinafter called "CONSULTANT") dated September 17, 2025, and identified as Contract No. 479-25 (“Agreement”).

RECITALS
A. CITY and CONSULTANT entered into an agreement for design services for the October 7th Memorial.

B. CITY and CONSULTANT desire to amend the Agreement to increase the Consideration, expand the Scope of Work, amend Exhibit A of the Agreement to reflect the added services, and amend Exhibit B of the Agreement to reflect the new Consideration amount.

NOW, THEREFORE, the parties agree as follows:

Section 1. The Consideration shall be amended as stated on the cover page.

Section 2. EXHIBIT A, “Scope of Work”, of the Agreement is hereby restated and amended as attached hereto and incorporated herein.

Section 3. EXHIBIT B, “Schedule of Payment and Rates”, of the Agreement is hereby amended as attached hereto and incorporated herein.

Section 4. Except as specifically amended by this Amendment No. 1, the remaining provisions of the Agreement shall remain in full force and effect.

Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C 3 EXECUTED the _____ day of __________________, 20___, at Beverly Hills, California.

CITY OF BEVERLY HILLS
A Municipal Corporation
____________________________
SHARONA R. NAZARIAN, PsyD
Mayor
ATTEST:
______________________(SEAL)

HUMA AHMED
CITY Clerk
CONSULTANT: Broskin, LLC

ARTUR NESTERENKO
Partner
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
_______________________ ____________________________
LAURENCE S. WIENER NANCY HUNT-COFFEY
City Attorney City Manager

____________________________
SHANA E. EPSTEIN
Director of Public Works

____________________________

MANDANA MOTAHARI
City Architect
____________________________
SHARON L’HEUREUX DRESSEL
Risk Manager
____________________________

ANTHONY RODSTEIN
Purchasing Services Manager
Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C 4 EXHIBIT A

SCOPE OF WORK

ORIGINAL AGREEMENT
Under the direction of the City Architect or her designee, CONSULTANT shall provide design services for the October 7th memorial monument, “Forty Steps to the Sky: A Memorial of Light and Memory” (the “Project”), to be located adjacent to the south side of the Library, at the northeast corner of Burton Way and Rexford Drive, including the following phases:

Pre-Schematic Design Phase
Completed by CONSULTANT and included in proposal submittal.

Schematic Design Phase
CONSULTANT and its engineers shall provide CITY with Schematic Design services, consisting of drawings and documents illustrating the scale and relationship of the Project components.

Deliverables include:
● A detailed Code Analysis confirmation, consisting of the Project type, occupancy summary, and other elements necessary to define the work fully. ● Attend coordination meetings.
● Conceptual layouts, elevations, and preliminary sections, including architectural and landscape.
● Preliminary cluster type configurations and area calculations. ● Concept and Schematic material palettes and color boards. ● Schematic renderings as necessary to fully describe the overall Project design.

Design Development Phase
Based on the approved Schematic Design, CONSULTANT and its engineers shall provide to CITY Design Development services. Design Development entails drawings and other documents to fix and describe the size and character of the Project. Finishes and materials will also be described in further detail and as appropriate. Deliverables shall include:
● CAD-generated design development plans, sections, elevations, and typical details indicating systems
● Orchestrate review meetings with governing agencies to verify code compliance and identify special conditions that may exist for the Project ● Attend coordination meetings
● Prepare and coordinate the Project outline specifications and drawings ● Prepare preliminary finish schedule, including primary material selections ● Updated 3D Concept Renderings used to describe the quality and character of the design The phases identified above shall include the following services to be performed by CONSULTANT or its subconsultants:

Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C 5 Structural Design Services
● Attend one (1) co-ordination meeting.
● Plan and organize structural retaining wall systems, including foundation systems. ● Prepare schematic design sketches and narrative, including preliminary sizing of primary structural systems for retaining walls, foundations, and the center sculpture support. ● Provide preliminary plans and sections.
● Prepare outline specifications.
● Obtain CONSULTANT and CITY written approvals of all structural proposals before the design development phase of work.

Civil Engineering – Design Services
Schematic Design Phase
● Review existing civil and utility information.
● Identify preliminary grading, stormwater, and utility considerations. ● Prepare schematic-level grading and utility diagrams to support the site design. ● Provide input on ADA access, pathways, and site circulation. ● Attend coordination meetings with CONSULTANT and CITY.

Design Development Phase
● Develop civil site plans indicating grading, drainage, utility connections, and paving coordination.
● Preparation of a horizontal and vertical control plan, establishing benchmarks, reference points, and layout data, for use by the design team and contractor. ● Coordinate with Landscape Architect and Mechanical, Engineering and Plumbing (MEP) for site integration.
● Prepare preliminary technical specifications.

Electrical, Plumbing Services
Schematic Design Phase
● Review Project concept and identify preliminary E/P requirements. ● Provide initial input on electrical service, drainage, and mechanical considerations (if applicable).
● Develop schematic diagrams for power distribution, lighting controls, plumbing connections, and any mechanical systems needed.
● Provide coordination with CONSULTANT and Civil Engineer. ● Attend CITY coordination meetings.

Design Development Phase
● Prepare Electrical and Plumbing (EP) design development drawings:
○ Electrical: load calculations, power layouts, conduit routing, panel schedules. ○ Plumbing: site water/sewer connections, drains, and fountain. ● Develop outline specifications.
● Coordinate with Lighting Designer for fixture power/control.

Landscape Architecture Services
Schematic Design Phase
Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C 6 ● Prepare conceptual landscape layouts, including preliminary grading, hardscape, planting, and irrigation strategies.
● Provide diagrams and sketches to illustrate the integration of the memorial with the surrounding park environment.
● Attend coordination meetings with CONSULTANT and CITY staff. ● Provide preliminary plant palettes and material boards.

Design Development Phase
● Prepare landscape plans, sections, and elevations to illustrate layout, grading, and planting strategies.
● Develop a preliminary irrigation approach.
● Coordinate with the Civil Engineer for grading and drainage integration. ● Update plant palettes and hardscape materials
● Attend review meetings with the CITY and agencies as required.

Civil Engineering – Design Services
● Review existing civil and utility information.
● Identify preliminary grading, stormwater and utility considerations. ● Prepare schematic-level grading and utility diagrams to support the site design. ● Provide input on ADA access, pathways, and site circulation. ● Attend coordination meetings with CONSULTANT and CITY. ● Assist CITY with final written approvals for civil scope.

Lighting Design Services
Schematic Design Phase
● Review site and memorial concept for lighting opportunities. ● Establish preliminary artistic and safety lighting goals. ● Develop concept lighting diagrams showing proposed fixture types and effects. ● Provide initial fixture palette and mood boards.
● Attend coordination meetings with CONSULTANT and CITY.

Design Development Phase
● Prepare lighting plans, fixture schedules, and outline specifications. ● Develop details for the integration of memorial step lighting, feature illumination, and landscape lighting.
● Coordinate with the Electrical Engineer for power and control requirements.

CONSULTANT guarantees the work shall be performed in accordance with the Scope of Work specified herein and to CITY’s full satisfaction and accordance with all relevant codes and regulations.

AMENDMENT NO. 1
In addition to the Scope of Work set forth above, CONSULTANT shall provide additional services as follows:

Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C 7 Architectural:

Construction Documents Services
Based on the approved Design Development package, CONSULTANT shall provide Construction Documents. The Construction Documents phase consists of providing construction drawings and specifications setting forth in detail the requirements for the construction of the Project, including:
 CAD-generated Construction Drawings set including detailed rendered floor plans, sections, elevations, and details sufficient to allow for lump sum bidding and construction of the Project (scale to vary requirements).
 Provide complete Project Specifications.
 Preparation of supplemental documents and bulletins as required during the bidding phase.  Submit construction documents for plan check and obtain governing agencies' written approvals.

Bidding and Negotiation Phase
CONSULTANT, following CITY’s written approval of the Construction Documents and of the latest preliminary estimate of Construction Costs, shall assist CITY in obtaining bids and assist in preparing and awarding the Contract(s) for Construction. Services for this phase include:
 Assist CITY in answering Requests for Information (“RFIs”).  Assist CITY in the evaluation of contractor-proposed alternates or substitutions.  Exhaustive bidding and/or requests to provide extensive material/finish alternates are not included in this proposal, but can be provided on an hourly billing basis.

Construction Administration Phase
CONSULTANT shall provide CITY administration services of the Contract(s) for Construction.

CONSULTANT shall, as a representative of CITY, visit the Project site at intervals appropriate to the stage of the contractor’s operations, or as otherwise agreed by CITY and CONSULTANT, to become generally familiar with and to keep CITY informed about the progress and quality of the portion of the work completed, to endeavor to guard CITY against defects and deficiencies in the work, and to determine in general if the work is being performed in a manner indicating that the work, when fully completed, will be in accordance with the Contract Documents. Services shall include:
 Review and certify applications for payment by the contractor.  Review, approve, and take other appropriate action upon submitting contract documents (i.e. shop drawings, product data, sample submittals, etc.).  Provide services related to the evaluation of the contractor's proposed substitutions or alternates.
 Review and respond to all Project submittals, including RFIs, shop drawings, and change order proposals for all building trades and disciplines.  Assist CITY in the Project close-out process, which would include the preparation of punch lists and the management of the completion of all work on those punch lists on a timely basis.
 Assist CITY in gaining the necessary Final Approvals from all governmental agencies and all required certificates of occupancy permits.

Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C 8 Structural:

Structural Bidding/Construction Administration Services  Support the bidding process, responding to RFIs.
 3 site visits for general observation of construction work in progress for the sole purpose of observing basic conformance to the contract documents.  Review contractor-supplied shop drawings, product data, material samples, and other related submittals for general conformance with the contract documents. Review of contractor submittals is limited to two (2) consecutive reviews for any single submission.  Review of other contractor-generated RFIs.
 Assist architect and contractor with the preparation of punch lists prior to final handover Landscape Architecture:

Construction Documents Phase
 Prepare complete landscape drawings, including planting plans, irrigation plans, hardscape details, and specifications.
 Provide coordination drawings with civil and lighting systems.  Submit drawings for CITY and agency written approvals.

Bidding and Negotiation Phase
 Respond to landscape-related RFIs during bidding.
 Review contractor-submitted alternates for landscape/hardscape materials.

Construction Administration
 Review contractor’s landscape submittals, shop drawings, and product data.  Conduct site visits to review planting, irrigation, and hardscape installation.  Assist CITY with punch lists and Project closeout for the landscape scope.

Civil Engineering:

Construction Documents Phase
 Prepare complete landscape drawings, including planting plans, irrigation plans, hardscape details, and specifications.
 Provide coordination drawings with civil and lighting systems.  Submit drawings for CITY and agency written approvals.

Bidding and Negotiation Phase
 Respond to landscape-related RFIs during bidding.
 Review contractor-submitted alternates for landscape/hardscape materials.

Construction Administration
 Review contractor’s landscape submittals, shop drawings, and product data.  Conduct site visits to review planting, irrigation, and hardscape installation.  Assist CITY with punch lists and project closeout for the landscape scope.

Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C 9 Electrical & Plumbing Engineering Services:

Construction Documents Phase
 Provide stamped construction drawings and specifications for EP systems.  Include diagrams, risers, details, and schedules as required by code.  Coordinate with Civil and Landscape drawings for utility integration.

Bidding and Negotiation Phase
 Respond to RFIs regarding EP scope.
 Review contractor substitutions for equipment and systems.

Construction Administration
 Review EP shop drawings and product submittals.
 Conduct periodic site visits during installation.
 Assist CITY in start-up, testing, and commissioning of EP systems.  Support CITY with final punch lists and approvals.

Lighting Design Services:

Construction Documents Phase
 Provide final lighting plans, fixture schedules, specifications, and control diagrams.  Prepare details for mounting, wiring, and integration with civil/landscape systems.  Submit for CITY’s written approval.

Bidding and Negotiation Phase
 Review contractor substitutions for fixtures and controls.  Respond to RFIs regarding lighting intent.

Construction Administration
 Review lighting shop drawings and product submittals.  Conduct aiming and focusing sessions after installation.  Provide a punch list review of the lighting system performance.

Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C 10 ATTACHMENT 1 TO EXHIBIT A
Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C F
- ¥ i u D
u? 0
r u
0 ; %
0% E
+
? u
a. J
>
Lu 0 . £
- 2 ;
>-5 0
£
F ! c:
0 U .

LL. 0
5 11

EXHIBIT B

SCHEDULE OF PAYMENT AND RATES
CITY shall compensate CONSULTANT for the satisfactory performance of the work described in this Agreement in a total amount not to exceed Two Hundred Thousand Four Hundred Eighty Dollars ($200,480.00), including all labor and taxes, as outlined and at the rates set forth in Attachment 1 to Exhibit B.

CITY shall compensate CONSULTANT for reimbursable expenses described in Attachment 1 to Exhibit reasonably incurred in the performance of the Agreement in an amount not to exceed Eight Thousand Five Hundred Dollars ($8,500.00).

Contingency in an amount not to exceed Seven Thousand One Hundred Twenty Dollars ($7,120.00) for additional, unforeseen, and unanticipated work outside the Scope of Work described in Exhibit A, and shall not be undertaken without the express direction by CITY in writing. Compensation for said additional work shall be mutually agreed upon by CITY and CONSULTANT in writing.

In no event shall this Agreement total exceed Two Hundred Sixteen Thousand One Hundred Dollars ($216,100.00).

CONSULTANT shall submit to CITY a detailed invoice, on a monthly basis or less frequently, for the services performed pursuant to this Agreement. Each invoice shall itemize the services rendered during the billing period and the amount due. Within 30 days of receipt of each invoice, CITY shall pay all undisputed amounts included on the invoice. CITY shall pay CONSULTANT said Consideration in accordance with the schedule of payment set forth in this Exhibit.

Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C 12 B0785-0001\3193232v1.doc
ATTACHMENT 1 TO EXHIBIT B
RATES
a. FEE ESTIMATE

ORIGINAL AGREEMENT
Pre-Schematic
Design
Schematic
Design
Design
Development Total
Design Studio /
Artist $14,500 $30,500 $40,500 $85,500
Structural $0 $1,200 $1,800 $3,000
MEP $0 $2,200 $3,000 $5,200
Civil Engineering $0 $4,500 $12,000 $16,500
Landscape
Designer $0 $6,000 $6,000 $12,000
Lighting Designer $0 $2,000 $2,000 $4,000
Professional
Services Subtotal $14,500 $46,400 $65,300 $126,200
Donation -$14,500 -$4,600 -$10,700 -$29,800
Professional
Services Total $0 $41,800 $54,600 $96,400
AMENDMENT NO.1
Construction
Documents
Bidding Construction
Administration Total
Design Studio /
Artist $32,000 $2,500 $25,000 $59,500
Structural $1,800 $900 $2,880 $5,580
MEP $3,000 $300 $0 $3,300
Civil Engineering $13,500 $500 $2,000 $16,000
Landscape
Designer $12,000 $1,200 $2,500 $15,700
Lighting Designer $3,500 $500 $0 $4,000
Professional $65,800 $5,900 $32,380 $104,080
Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C 13 B0785-0001\3193232v1.doc
Services Subtotal
Donation -$0 -$0 -$0 -$0
Professional
Services Total $65,800 $5,900 $32,380 $104,080
Reimbursable Expenses
Step Mockup $6,500
Shipping Cost TBD (shipping rates will be provided after fabrication) Art Piece Mockup (Shard of Light) $2,000
Shipping Cost TBD (shipping rates will be provided after fabrication) Docusign Envelope ID: 78B9ABA7-0522-4430-965F-453E1FCD635C b. HOURLY RATES
Design Studio Hourly Rate Structural Engineer Hourly Rate Principal $300 Principal Engineer $180
Project Director $250
Project Manager $180 MEP Hourly Rate
3D Modeling $150 Principal Engineer $200
Visualization $200 Project Manager $150
Draftsman $125 Electrical Engineer $150
Civil Engineer Hourly Rate Landscape / Lighting Hourly Rates Project Engineer $225 Principal / Designer $125
Project Manager $250 Project Manager $95
Designer $75
Certificate Of Completion
Envelope Id: 78B9ABA7-0522-4430-965F-453E1FCD635C Status: Sent Subject: Complete with Docusign: Broskin (479-25) Oct 7 Memorial AM1.pdf Source Envelope:

Document Pages: 13 Signatures: 6 Envelope Originator:

Certificate Pages: 3 Initials: 0 Jazmin Rosas
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
455 N. Rexford Drive
Beverly Hills, CA 90210
[email protected]
IP Address: 198.245.189.169
Record Tracking
Status: Original
12/5/2025 3:28:34 PM
Holder: Jazmin Rosas
[email protected]
Location: DocuSign
Signer Events Signature Timestamp
Artur Nesterenko
[email protected]
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 8.3.220.162
Sent: 12/5/2025 3:38:39 PM
Resent: 12/8/2025 8:04:03 AM
Viewed: 12/8/2025 8:28:16 AM
Signed: 12/8/2025 8:28:36 AM
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Deborah R. Hakman for
[email protected]
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 2a04:4e41:2801:d376::1165:5376
Signed using mobile
Sent: 12/8/2025 8:28:37 AM
Resent: 12/8/2025 10:20:31 AM
Viewed: 12/8/2025 10:59:18 AM
Signed: 12/8/2025 10:59:37 AM
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Anthony Rodstein
[email protected]
Purchasing Services Manager
City of Beverly Hills (Finance Department)
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 198.245.189.181
Sent: 12/8/2025 10:59:39 AM
Viewed: 12/8/2025 1:49:52 PM
Signed: 12/8/2025 1:49:56 PM
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Sharon L'Heureux Dressel
[email protected]
Risk Manager
Sharon Dressel
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 198.245.189.166
Sent: 12/8/2025 1:49:58 PM
Viewed: 12/8/2025 2:37:36 PM
Signed: 12/8/2025 2:37:43 PM
Electronic Record and Signature Disclosure:

Not Offered via Docusign
? docusign
Signer Events Signature Timestamp
Mandana Motahari
[email protected]
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 198.245.189.177
Sent: 12/8/2025 2:37:45 PM
Viewed: 12/8/2025 2:53:40 PM
Signed: 12/8/2025 2:54:38 PM
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Shana E. Epstein
[email protected]
Director of Public Works
Security Level: Email, Account Authentication
(None) Signature Adoption: Pre-selected Style
Using IP Address: 2600:387:15:817::3
Signed using mobile
Sent: 12/8/2025 2:54:41 PM
Viewed: 12/8/2025 3:23:35 PM
Signed: 12/8/2025 3:24:52 PM
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Anthony Rodstein
[email protected]
Purchasing Services Manager
City of Beverly Hills (Finance Department)
Security Level: Email, Account Authentication
(None)
Sent: 12/8/2025 3:24:54 PM
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Nancy Hunt-Coffey
[email protected]
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Sharona R. Nazarian
[email protected]
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Huma Ahmed
[email protected]
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:

Not Offered via Docusign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Carbon Copy Events Status Timestamp
Jessika Vasquez
[email protected]
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Jackie Galeas
[email protected]
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 12/5/2025 3:38:39 PM
Payment Events Status Timestamps
Attachment 2
Top View - Full Site - Day Time Visualization Page 5 of 21 FORTY STEPS TO THE SKY A Memorial of
tight
aned
Memory
Dedicated to the Victims of October
Front View - Day Time Visualization Page 8 of 21 FORTY STEPS TO THE SKY A Memorial of
Light
and
Memory
Dedicated to the Victims of October 7

← All documents from this meeting