STAFF REPORT
Meeting Date: March 4, 2026
To: Honorable Mayor & City Council
From: Daren Grilley, PE, PTOE, Assistant Director of Public Works/City Engineer Martha Eros, Transportation Planner
Subject: Microtransit Pilot Project
Attachments: 1. City Council/TPC Liaison Committee Staff Report, August 22, 2023

2. Request for Proposals No. 25-350-7

3. Key RFP Requirements

4. Protest from Circuit, Inc., February 12, 2026

5. Via Transportation Proposal [redacted]

INTRODUCTION
The City's adopted Complete Streets Plan includes goals and policies for exploring a fast, reliable local transit system with connections to the Metro D (Purple) Line subway stations planned to open along Wilshire Boulevard in 2026 and 2027. With the absence of convenient parking at both Metro subway stations, interest in local transit connections is expected to be high when the stations become operational.

The City's adopted Climate Action & Adaptation Plan also recommends developing a locally operated transit system to help shift away from single-occupancy vehicles and reduce carbon emissions. These planning documents establish clear policy direction for the City to explore municipal transit options that complement the regional Metro network.

BACKGROUND
Transit Needs Assessment Study
Following direction from City Council at their March 15, 2022 Study Session, staff initiated a study of a potential local transit shuttle system. Kittelson & Associates was retained to conduct a comprehensive Transit Needs Assessment Study to determine whether current and future planned transit services are sufficient to support the needs of Beverly Hills residents, workers, and visitors.

To better understand demand, City staff and the Kittleson team held public workshops with interactive mapping exercises and conducted an online survey, receiving over 400 responses from residents, workers, and visitors. Kittleson also analyzed existing regional and local transit BEVERL
HILLS
~d
Meeting Date: March 4, 2026

Page 2 of 8 ends

use patterns and interviewed peer agencies (LA Metro, West Hollywood, Culver City) regarding their transit operations to inform a potential transit system in Beverly Hills.

Study Findings and Recommendations
The assessment identified significant unmet transit needs and strong community interest with nearly 75% of respondents expressing current or future interest in using transit within Beverly Hills. Primary service gaps include lack of north-south connectivity, infrequent local circulation (e.g., some routes operate only once per hour), and missing connections to key destinations such as schools, parks, medical facilities, and the Golden Triangle business district. Top barriers to transit use include unreliable/slow service, confusing transfers, limited coverage, and system complexity. Community mapping identified high-demand destinations, including the Business Triangle, City facilities, schools, parks, medical facilities, and major shopping areas.

Only 35% of current transit riders rated existing service as "good" or "very good" with most rating it as "fair."
The Kittelson study recommended a pilot fixed-route transit service in the southern portion of the city with a complementary demand-based microtransit program in the northern portion that would serve both commercial and residential areas. The study concluded that Beverly Hills is well-suited for microtransit service due to its compact urban form, strong street grid pattern in much of the city, mix of land uses providing consistent all-day travel demand, and need for flexible service to complement fixed-route regional transit. The study also emphasized the critical importance of ensuring connections to the future subway stations to maximize the effectiveness of the regional transit investment and provide first/last mile connectivity for residents and visitors. As part of the study, the City conducted a one-day demonstration of a fixed-route circulator service to evaluate operational feasibility.

Previous Liaison Committee Direction
In August 2023, the City Council and Traffic and Parking Commission Liaison Committee reviewed the study results (Attachment 1) and determined that a point-to-point, on-demand service would better serve the community's diverse travel needs compared to a fixed-route model with scheduled stops and limited flexibility. Staff was directed to research on-demand, point-to-point transportation options such as microtransit or partnering with Transportation Network Companies (TNCs) like Uber or Lyft to provide greater destination coverage and scheduling flexibility while maintaining the connectivity goals identified in the needs assessment.

What Is Microtransit?
Microtransit is a technology-enabled transit service that provides flexible, on-demand shared rides within a defined service area. Unlike traditional fixed-route transit with predetermined schedules and stops, microtransit uses dynamic routing algorithms to match multiple passengers traveling in similar directions and optimize vehicle routes in real-time based on trip requests. Riders book trips via smartphone app, website, or phone, are picked up at or near their location, and are dropped off at their destination with the service intelligently grouping trips to maximize efficiency.

The microtransit concept emerged in the mid-2010s as advances in smartphone technology, GPS tracking, and algorithmic optimization made it feasible to provide shared-ride services at scale. Cities began piloting microtransit as a solution to the "first mile/last mile" problem— connecting residents to major transit hubs—and to serve lower-density areas where traditional fixed-route service is cost-prohibitive. Microtransit differs from TNCs in that it prioritizes shared rides, operates within defined zones, serves the public interest, and is managed and typically subsidized by public agencies to ensure equitable access and affordable fares.

Meeting Date: March 4, 2026

Page 3 of 8 ends

Today, microtransit services operate in hundreds of cities across the United States, from major metropolitan areas to smaller suburban communities. The service has proven particularly effective in compact urban environments with diverse destinations and integration needs with regional transit networks. The Beverly Hills daytime population is upwards of 200,000 due to the high volume of people who work and visit every day, and a microtransit service could be an effective tool to reduce traffic congestion associated with non-residents entering the City.

DISCUSSION
Request for Proposals and Evaluation
On November 15, 2024, the City released Request for Proposals (RFP) No. 25-350-7 for Microtransit Turnkey Services (Attachment 2). The RFP sought qualified transportation contractors to develop and implement a flexible transit service for an 18-month pilot program in the form of mobility-on-demand or microtransit services for general public use within the City of Beverly Hills. The key RFP requirements are summarized in Attachment 3.

Seven qualified proposals were submitted. The evaluation team comprised of staff from Public Works, Community Services, Policy and Management, and Police, who reviewed and scored all proposals.

The City utilized a qualifications-based selection approach, which is standard for professional services contracts and complex operational services like microtransit. Proposals were first evaluated based on qualifications, experience, approach, and technical merit without consideration of cost. Cost information was provided separately by each proposer and was not shared with evaluators during the initial evaluation. After identifying the most qualified proposer(s), cost proposals were reviewed for reasonableness and competitiveness.

Proposals were evaluated using the following weighted criteria:

1. History and capacity to perform the service (15%);

2. Qualifications and experience with similar programs (15%);

3. Familiarity with and proximity to the program area (10%);

4. Proposed program approach and schedule (30%);

5. Proposed technology and fleet (20%); and

6. References from programs of similar size and scope (10%).

The three highest-scoring firms (Circuit, MV Transportation, and Via Transportation) were invited for oral interviews. Based on the proposals and interviews, the evaluation team agreed unanimously that Via emerged as the clear leading candidate based on comprehensive evaluation across all criteria. Via is the largest microtransit provider in the nation, working with more than 30 agencies in California, including many cities in this area such as Los Angeles, Torrance, Calabasas, and West Covina. Via offers a unique combination of unified technology and operations platform, strong local LA County presence, and proven track record of securing grant funding for peer agencies.

On February 12, 2026, staff received a letter from Circuit, Inc., protesting the award of a contract for microtransit services (Attachment 4). While the evaluation process was completed several months ago, Circuit argues that they should be allowed to provide updated information about their services for reconsideration. The City Attorney’s office has reviewed this protest and determined that the process being followed is consistent with the provisions in the RFP and that the City is not obligated to allow a protesting vendor to submit additional information or reopen the proposal process.

Meeting Date: March 4, 2026

Page 4 of 8 ends

Proposed Service
For the proposed Microtransit Pilot Project, Via would deploy a turn-key shuttle service with ondemand, shared rides that would be dynamically routed in response to demand. Via would provide all aspects of the service, including vehicles, drivers, operations, technology, data analytics, and customer support. Riders would book rides through a customized smartphone application, through a web booking platform, or by phone with 24/7 live customer support. Via’s platform allows riders to plan trips that seamlessly connect with existing Metro fixed-route bus service, as well as the upcoming D Line subway. Support for multiple languages and ADA accessible communication would be provided.

Via proposes a "corner-to-corner" service model for the general public with automatic "curb-tocurb" service for seniors and riders with disabilities. In corner-to-corner service, riders typically walk a short distance to the nearest key intersection for pickup and drop-off. This maximizes efficiency by keeping vehicles on major streets, avoiding time-consuming navigation through residential areas and driveways, enabling more riders to be served per hour and reducing trip times. For seniors and riders with disabilities, the system would automatically provide curb-tocurb service with vehicles brought directly to their specific address.

The proposed vehicle fleet would consist of four zero-emission electric vehicles with seating for 7-10 passengers, including two wheelchair accessible vehicles (WAVs). A fifth vehicle would be available as a spare to ensure service reliability. The vehicles would be marked or wrapped with City-approved branding and equipped with bicycle racks. It is anticipated that the vehicles would be charged using existing infrastructure within or near Beverly Hills.

Service Hours and Performance Expectations
The proposed service would operate seven days per week, year-round, initially from 6 AM to 10 PM daily, providing 16 hours of service each day. This extensive operating schedule is designed to accommodate diverse travel needs, including morning and evening commutes, midday errands, medical appointments, recreational activities, and evening dining and entertainment.

The service would cover the entire 5.7 square mile area of the City with priority connection points at the D Line subway stations along Wilshire Boulevard.

Via projects the pilot project will serve approximately 200 rides per day once established. The service is designed to achieve an average wait time of 15 minutes with 90% of pickups occurring within 20 minutes of request. Fleet deployment would consist of up to four vehicles on weekdays and three on weekends, adjusted based on demand.

Safety and Security
Passenger and driver safety is critically important and would be addressed through a multilayered security approach that exceeds standard transit safety practices. Via’s drivers would undergo extensive background checks, DMV record review, and drug testing before hire. Driver training includes de-escalation techniques, conflict resolution, and passenger safety protocols in partnership with nationally-recognized organizations including the National Safety Council and Community Transportation Association of America. All vehicles will be equipped with multiple security cameras that provide continuous recording and GPS tracking. Via uses these systems to support continuous AI-assisted driver coaching and proactive safety programs ensure ongoing adherence to the highest safety standards.

City staff, including the IT Department, have met with Via's technical team to develop solutions to ensure that live video feeds from all vehicles will be streamed directly to the Beverly Hills Police Department (BHPD) Real Time Watch Center. This integration will provide BHPD with Meeting Date: March 4, 2026

Page 5 of 8 ends

real-time visibility into all microtransit vehicles, enabling immediate response to safety incidents and enhancing overall public safety.

Data Collection and Analytics
Via collects operational data, including vehicle locations, trip requests, passenger origins and destinations, wait times, and completion rates. This data is used in real-time to route vehicles efficiently and adjust deployment based on demand patterns.

City staff will have continuous access to a performance dashboard showing daily ridership, average wait times, on-time performance, customer satisfaction, service area usage, vehicle miles traveled, and estimated emissions reductions. All data can be downloaded for City analysis. Via will provide monthly performance reports and quarterly meetings with staff to review service performance and recommend adjustments.

This data will allow staff to monitor contractor performance against service standards, identify areas or times needing service adjustments, and provide information for City Council when considering continuing, modifying, or expanding the service beyond the pilot period.

Via’s full proposal is included as Attachment 5.

Recent Liaison Committee Direction
On January 7, 2026, the City Council/TPC Liaison Committee received a report on the potential microtransit program and provided feedback on the proposed service. The Council Liaisons were generally supportive of the program and thought the service would be valuable but had several considerations they would like to explore with the full City Council before making a recommendation to pursue the pilot program or not.

First, the Liaisons wanted to consider absorbing the City’s Dial-A-Ride program into the pilot microtransit service to reduce costs. The Dial-A-Ride shuttle provides free curb-to-curb, sharedride transportation for Beverly Hills residents aged 62 and above or residents with disabilities of any age and transports passengers to any location within the city, as well as nearby hospitals and supermarkets outside City limits. The Dial-A-Ride program costs approximately $600,000 per year, which breaks down to approximately $85 per ride (compared with $21 per ride projected for the microtransit pilot). The cost savings associated with incorporating Dial-A-Ride is discussed further in the Fiscal Impact section below.

Because of the similarity in service models and opportunity to reduce the cost per ride through comingling services, cities with microtransit programs have started to operate their Dial-A-Ride programs through microtransit. To ensure seniors are prioritized, they are allowed to pre-book rides while the service remains on-demand for microtransit customers. While incorporating the City’s Dial-A-Ride into microtransit would also allow for evaluation of the comingled service during the pilot period, if microtransit and/or the merger were not successful, the City would need to begin a new procurement process to replace the Dial-A-Ride service. Staff presented the concept of absorbing the Dial-A-Ride program to the City’s Active Adult Club, which offered their support.

Second, the Liaisons asked about potential integration of Waymo into the microtransit program.

In late 2025, Via announced a partnership with Waymo as part of the City of Chandler, Arizona’s microtransit service1 to maintain high quality performance during periods of high demand.

During these busier times, the algorithm determines if it would be more cost-effective to match 1 https://www.chandleraz.gov/news-center/city-chandler-partners-waymo-and-bring-avs-chandler-flex Meeting Date: March 4, 2026

Page 6 of 8 ends

certain riders, such as those with origins/destinations not aligned with other passengers’ routes, to solo, point-to-point Waymo trips.

When the City’s microtransit RFP was issued in late 2024, the City invited Waymo to respond, but they declined because public transit is not part of their service model. While that remains true today, the City could deploy a Via-Waymo partnership similar to their Chandler, Arizona operations that would allow Via’s routing technology to incorporate Waymo’s vehicles into its existing fleet, specifically during peak times. All trips remain algorithm-assigned; riders cannot directly request autonomous or private trips. This capability supports consistent service standards during high-demand periods while reinforcing the City's goals to promote shared transit and reduce single-occupancy vehicle trips.

Finally, while Via has indicated that they could begin the implementation phase immediately with launch of service within eight weeks of approval, one Council Liaison suggestion was to consider delaying the launch of the potential pilot program up to six months after the opening of the Wilshire/La Cienega station to provide a clearer picture of first/last mile needs. Another Liaison suggested that delaying the launch might lead to missed opportunities if potential riders perceive taking the subway to be infeasible without a first/last mile connection and rule out transit as an alternative to driving.

Next Steps
If supported by City Council, staff would work with Via to finalize recommendations for the pilot service – such as fare structure, operating parameters, performance measures, marketing, and security logistics with BHPD – and return for City Council feedback, if requested. Marketing, vehicle branding, and public outreach would be closely coordinated with the City Public Information Team.

Additionally, if City Council direction includes incorporating the Dial-A-Ride program into the microtransit pilot, staff would conduct targeted outreach, including one-on-one training, to current Dial-A-Ride customers to help create a seamless transition.

FISCAL IMPACT
Costs
Via's pricing proposal is structured as a pay-as-you-go model based on vehicle service hours.

The first-year cost is estimated at $1.6 million, which includes operational costs plus $112,000 in one-time upfront costs for technology installation, vehicle retrofits, and branding. Year two operational costs are estimated at $1.5 million. The total two-year pilot program cost is approximately $3.1 million with an average hourly rate of $89 per vehicle hour. (For comparison, the other two firms interviewed provided two-year cost proposals of $2.9 million and $5.8 million.)
The upfront costs cover technology platform configuration, wheelchair accessible vehicle retrofits, custom vehicle wraps, and launch preparation. Monthly operational costs average $125,000 in year one and $128,000 in year two, covering all aspects of service delivery, including vehicle lease and maintenance, driver wages and benefits, insurance, fuel/charging, customer service, technology platform, and ongoing marketing support.

Based on the projected ridership of 200 rides per day over the two-year period (approximately 146,000 total rides), the estimated cost per ride is approximately $21. The actual cost per ride will be higher during initial ramp-up months when ridership is lower and is expected to decrease as the service becomes established and ridership grows.

Meeting Date: March 4, 2026

Page 7 of 8 ends

Potential Integration of Dial-A-Ride Program
Due to the low number of average daily rides currently served by the City’s Dial-A-Ride program, Via’s pricing proposal can absorb Dial-A-Ride without an increase to the proposed cost. In 2024 and 2025, the Dial-A-Ride service averaged 15-16 rides per day with an annual cost of $478,479 and $487,867 respectively (approximately $85 per ride). By absorbing the DialA-Ride program into the microtransit service, the cost to serve Dial-A-Ride customers would drop significantly from approximately $85 to around $20 per trip and provide a cost savings to the City of approximately $500,000 per year.

Funding
The proposed two-year pilot project could be funded from available fund balance in Proposition A revenue (Fund 300), which is restricted to transit uses. The City receives approximately $850,000 annually through the Proposition A Local Return. While there is currently a surplus in this fund that would fully fund a two-year pilot project, and possibly an additional one to two years beyond the pilot, Proposition A alone is not sufficient to fully fund ongoing operations long-term without supplemental funding from other sources. Long-term service sustainability would require a combination of additional local transportation funds (Proposition C, Measure R, and Measure M allocations), grant funding, and/or General Fund support. Via's grants team would work with City staff during the pilot period to identify and pursue competitive grant opportunities that could significantly offset ongoing operational costs, as they have successfully done for peer agencies, including Cupertino ($8.5M state grant) and Richmond ($3.2M state funding).

Farebox Revenue
Microtransit fares in the US typically range from $1 to $5 for a one-way trip. Using an assumed $2 fare and ridership increasing to 200 daily rides, Via estimates potential fare revenue could reach $195,000 over the two-year period. Per the terms of the RFP, fare revenue will either be credited back to the City to reduce net costs or reinvested in service enhancements at the City's discretion. City Council may choose a higher or lower fare as well as a free promotional period to encourage riders to try the service. If Dial-A-Ride is incorporated into the pilot, rides would be free for residents aged 62 and above as well as residents with disabilities of any age.

Comparison to Other Transit Service Costs
This cost per ride is comparable to similar services; for example, LA Metro's Metro Micro program operates at approximately $30 per ride according to the 2022 Transit Needs Assessment Study conducted by Kittelson & Associates.

Like transit systems throughout California and the nation, the proposed microtransit pilot requires significant taxpayer subsidy. California transit systems collectively operate at approximately 10% farebox recovery2, meaning fare revenue covers only one-tenth of operating costs. The Beverly Hills pilot's estimated cost structure is consistent with industry norms for ondemand transit services.

The primary justification for public transit investment is not financial return, but rather the public benefits of reduced traffic congestion, lower greenhouse gas emissions, improved mobility for residents without vehicles, economic vitality through enhanced access to businesses, and fulfillment of the City's adopted Complete Streets and Climate Action goals. The pilot project data collection will enable the City to quantify these benefits and assess whether the public value justifies the ongoing investment.
2 Marc Joffe and Athan Joshi, "The Cost of Transit in California," California Policy Center, January 2025.

Meeting Date: March 4, 2026

Page 8 of 8 ends

RECOMMENDATION
Staff recommends that City Council provide direction on next steps for the potential microtransit pilot project.

Shana Epstein,
Director of Public Works
Approved By
Attachment 1

CITY OF BEVERLY HILLS

PUBLIC WORKS DEPARTMENT

MEMORANDUM
City Council and Traffic and Parking Commission Liaison Committee Daren Grilley, Assistant Director/City EngineerMartha Eros, Transportation Planner August 22, 2023
Beverly Hills Transit Feasibility Study

1. November 14, 2022 City Council Traffic and Parking Commission Liaison Committee Memorandum (Excerpt)

2. Proposed Transit Fixed-Route Circulator
TO:

FROM:DATE:

SUBJECT:

ATTACHMENT:

RECOMMENDATION
Staff recommends that the City Council and Traffic and Parking Commission Liaison Committee (Liaison Committee) receive progress updates on the Transit Feasibility Study and provide feedback and direction to staff on next steps for a potential pilot transit program consisting of a combination of a fixed-route circulator and citywide on-demand microtransit system.

INTRODUCTION
The adopted 2021 Complete Streets Plan includes goals and policies for exploring a fast, reliable local transit shuttle with connections to the upcoming Metro D (Purple) Line subway stations. With the absence of convenient parking at both Metro subway stations, interest in local transit connections is anticipated when the subway stations open in the future. The draft Climate Action& Adaptation Plan also recommends developing a locally operated transit system to help shiftaway from single-occupancy vehicles and reduce the length of vehicle trips.

A transit needs assessment, including public surveys and outreach, was conducted between July and September 2022. The findings were presented at the October 6, 2022, TPC meeting and the Commission supported the recommendation to develop a pilot project for City Council to consider that would consist of one fixed circulator route operating with high frequency (e.g., 15-minute headways) south of North Santa Monica Boulevard, along with demand-based microtransit that would serve residential areas.

This information was reported to the Liaison Committee on November 14, 2022 (Attachment 1).

Vice Mayor Gold, TPC Chair Ignarro and Vice-Chair Shalowitz were in attendance; Councilmember Mirisch recused himself. At that meeting, staff received direction to proceed with additional community outreach to receive feedback on a draft transit route and shuttle stops on commercial and/or residential public right-of-way.

DISCUSSIONSecond Public Survey
Staff released a second Transit Circulator Pilot Program Survey the week of December 5, 2022, to gather feedback on the proposed route and stops. Following the same outreach plan for the TO:

FROM: DATE:

SUBJECT:

ATTACHMENT:

CITY OF BEVERLY HILLS

PUBLIC WORKS DEPARTMENT

MEMORANDUM
City Council and Traffic and Parking Commission Liaison Committee Daren Grilley, Assistant Director/City Engineer Martha Eros, Transportation Planner August 22, 2023
Beverly Hills Transit Feasibility Study

1. November 14, 2022 City Council Traffic and Parking Commission Liaison Committee Memorandum (Excerpt)

2. Proposed Transit Fixed-Route Circulator

RECOMMENDATION
Staff recommends that the City Council and Traffic and Parking Commission Liaison Committee (Liaison Committee) receive progress updates on the Transit Feasibility Study and provide feedback and direction to staff on next steps for a potential pilot transit program consisting of a combination of a fixed-route circulator and citywide on-demand microtransit system. INTRODUCTION The adopted 2021 Complete Streets Plan includes goals and policies for exploring a fast, reliable local transit shuttle with connections to the upcoming Metro D (Purple) Line subway stations. With the absence of convenient parking at both Metro subway stations, interest in local transit connections is anticipated when the subway stations open in the future. The draft Climate Action & Adaptation Plan also recommends developing a locally operated transit system to help shift away from single-occupancy vehicles and reduce the length of vehicle trips. A transit needs assessment, including public surveys and outreach, was conducted between July and September 2022. The findings were presented at the October 6, 2022, TPC meeting and the Commission supported the recommendation to develop a pilot project for City Council to consider that would consist of one fixed circulator route operating with high frequency (e.g., 15-minute headways) south of North Santa Monica Boulevard, along with demand-based microtransit that would serve residential areas.

This information was reported to the Liaison Committee on November 14, 2022 (Attachment 1).

Vice Mayor Gold, TPC Chair lgnarro and Vice-Chair Shalowitz were in attendance; Councilmember Mirisch recused himself. At that meeting, staff received direction to proceed with additional community outreach to receive feedback on a draft transit route and shuttle stops on commercial and/or residential public right-of-way.

DISCUSSION Second Public Survey
Staff released a second Transit Circulator Pilot Program Survey the week of December 5, 2022, to gather feedback on the proposed route and stops. Following the same outreach plan for the

Page 2 of 3 ends

0822.23 CC-TPC Liaison
feasibility planning phase, the City’s Communications team engaged in multiple layers of outreachto solicit participation in the transit survey and attendance at virtual and in-person community meetings. The outreach included newspaper ads, citywide mailings, email blasts, posted signs at transit stops, promotion at City meetings and special events, social media posts, and informationalflyers at public counters and on the City’s Senior Dial-A-Ride vehicles.

Staff provided a summary of the 113 responses at the January and February 2023 TPC meetings.Highlights include:
• 60% indicated interest in using a local public transit system in the future, • 41% focus on on-time and reliable service,
• 38% importance of short distances between stops, and
• 48% will use service for recreation, 48% work/commuter, 22% travel.

Write-in comments included the omission of Roxbury Park, the high school, and residential areas in the southwest and north of North Santa Monica Boulevard; attractive bus stop amenities; and duplicating existing Metro bus operations.

Demonstration and Test RunsMultiple test runs by staff were conducted to test AM and PM peak-hour and non-peak travel times on random days and times, as well as identify stop locations. Based on public input and test runexperiences, a fixed-route circulator was developed (Attachment 2).On March 2, 2023, a transit circulator demonstration was performed from 9 AM to 4 PM to allowcommunity members to get a feel for how a local transit system could operate and to provideadditional feedback on the future pilot project.

The demonstration consisted of two City shuttles traveling, each traveling in opposite directionswith 21 stops. Each full loop took approximately 35-40 minutes to complete depending on traffic conditions; occasional blockage of a bus stop zone by private passenger vehicles wasencountered during operations. Additionally, one run was conducted in the Flats neighborhood, north of North Santa Monica Boulevard via North Rexford and Beverly Drives, to evaluate road grade, potential bus stops on residential street blocks, and distance and timing for a potential northern loop; the loop without stops took approximately 25 minutes.

Phased Implementation Options
The pilot shuttle system could be implemented in phases by adding the southwest area of the city connecting to Beverly Hills High School and Roxbury Park at some point during the pilot period.

The proposed demand-based pilot microtransit system is intended to serve all areas of the city based on availability. Although the proposed pilot route runs alongside existing Metro bus lines, frequency and connections between Metro bus stops can take 30-50 minutes in certain areas and may require multiple transfers to reach a local destination, thus the goal of a local shuttle systemis to increase frequency for shorter bi-directional trips.

Direction RequestedStaff seeks direction on implementing a pilot transit system, including:

1. Continue planning the implementation of a two-year pilot transit system. o Combination of circulator and microtransit (recommended by TPC and staff)o Circulator onlyo Microtransit only

Page 2 of 3 ends

08.22.23 CC-TPC Liaison
feasibility planning phase, the City's Communications team engaged in multiple layers of outreach to solicit participation in the transit survey and attendance at virtual and in-person community meetings. The outreach included newspaper ads, citywide mailings, email blasts, posted signs at transit stops, promotion at City meetings and special events, social media posts, and informational flyers at public counters and on the City's Senior Dial-A-Ride vehicles. Staff provided a summary of the 113 responses at the January and February 2023 TPC meetings. Highlights include:
• 60% indicated interest in using a local public transit system in the future, • 41 % focus on on-time and reliable service, • 38% importance of short distances between stops, and • 48% will use service for recreation, 48% work/commuter, 22% travel.

Write-in comments included the omission of Roxbury Park, the high school, and residential areas in the southwest and north of North Santa Monica Boulevard; attractive bus stop amenities; and duplicating existing Metro bus operations. Demonstration and Test Runs Multiple test runs by staff were conducted to test AM and PM peak-hour and non-peak travel times on random days and times, as well as identify stop locations. Based on public input and test run experiences, a fixed-route circulator was developed (Attachment 2). On March 2, 2023, a transit circulator demonstration was performed from 9 AM to 4 PM to allow community members to get a feel for how a local transit system could operate and to provide additional feedback on the future pilot project.

The demonstration consisted of two City shuttles traveling, each traveling in opposite directions with 21 stops. Each full loop took approximately 35-40 minutes to complete depending on traffic conditions; occasional blockage of a bus stop zone by private passenger vehicles was encountered during operations. Additionally, one run was conducted in the Flats neighborhood, north of North Santa Monica Boulevard via North Rexford and Beverly Drives, to evaluate road grade, potential bus stops on residential street blocks, and distance and timing for a potential northern loop; the loop without stops took approximately 25 minutes. Phased Implementation Options The pilot shuttle system could be implemented in phases by adding the southwest area of the city connecting to Beverly Hills High School and Roxbury Park at some point during the pilot period.

The proposed demand-based pilot microtransit system is intended to serve all areas of the city based on availability. Although the proposed pilot route runs alongside existing Metro bus lines, frequency and connections between Metro bus stops can take 30-50 minutes in certain areas and may require multiple transfers to reach a local destination, thus the goal of a local shuttle system is to increase frequency for shorter bi-directional trips.

Direction Requested Staff seeks direction on implementing a pilot transit system, including:

1. Continue planning the implementation of a two-year pilot transit system. o Combination of circulator and microtransit (recommended by TPC and staff) o Circulator only o Microtransit only

Page 3 of 3 ends

08.22.23 CC-TPC Liaison

2. Postpone implementation to coordinate with opening of the Metro subway system.3. Cease further evaluation of a local transit system.

FISCAL IMPACT
Preliminary Cost Estimate
The initial estimated costs described in Kittelson’s Draft Transit Needs Assessment Study Technical Memorandum was approximately $3.5 million. That figure was based on transit industry standards and a desired 15-minute headway for fixed-route shuttle and on-demand microtransitservices for a one-year pilot program.

Revised Preliminary Cost Estimate
The data gathered from the demonstration was used to determine service frequency, number ofvehicles needed to meet demand and refine the preliminary cost estimates. The following revised cost estimate range for the elements of the proposed pilot program was prepared by staff inconsultation with other agencies and the executive management team of the City’s current transitcontractor:
• Circulator Fixed-Route and On-demand Microtransit: $ 3.5-4.5 million• Circulator Fixed-Route Only: $ 3.0-3.7 million• Microtransit On-demand Only: $ 500,000-800,000 DRAFT Fixed Route Microtransit Both
Vehicles 14* 2 16
Operation 3 0 3
Maintenance 3 0 3
Administration 2 1.5 2
Drivers*l TBD TBD TBD
Fuel TBD TBD TBD
Technology TBD TBD TBD
* 15-minute headway each direction*A Full- and Part-time shifts Factors affecting the actual costs include the general operation and administrative costs by aprofessional transit provider, type and number of vehicles to operate an effective system with the desired 15-minute frequencies, transit stop improvements. The cost estimate does not include potential future infrastructure improvements to support alternative (i.e., electric) fuel vehicles.

Purchasing and contracts associated with the pilot program will follow City solicitation and procurement policies.

Funding for a pilot program is available for one-year only using a combination of local return transportation funds, including Proposition A and Measure M funds. All local, state and federaltransportation funding requires that services be open to the general public without discrimination and cannot be exclusive to one subset of the population.

Depending on the option selected and the duration of the pilot program, additional funding appropriation will be necessary for fiscal year 2024/25 and beyond. Additional study will be required to understand the capital and operations financial needs and revenue options to sustain a long-term, ongoing transit system.

Page 3 of 3 ends

08.22.23 CC-TPC Liaison

2. Postpone implementation to coordinate with opening of the Metro subway system. 3. Cease further evaluation of a local transit system.

FISCAL IMPACT
Preliminary Cost Estimate
The initial estimated costs described in Kittelson's Draft Transit Needs Assessment Study Technical Memorandum was approximately $3.5 million. That figure was based on transit industry standards and a desired 15-minute headway for fixed-route shuttle and on-demand microtransit services for a one-year pilot program.

Revised Preliminary Cost Estimate
The data gathered from the demonstration was used to determine service frequency, number of vehicles needed to meet demand and refine the preliminary cost estimates. The following revised cost estimate range for the elements of the proposed pilot program was prepared by staff in consultation with other agencies and the executive management team of the City's current transit contractor:
• Circulator Fixed-Route and On-demand Microtransit: • Circulator Fixed-Route Only: • Microtransit On-demand Only:
$ 3.5-4.5 million $ 3.0-3. 7 million
$ 500,000-800,000
DRAFT Fixed Route Microtransit Both
Vehicles 14 2 16
Operation 3 0 3 Maintenance 3 0 3
Administration 2 1.5 2
Drivers TBD TBD TBD Fuel TBD TBD TBD
Technology TBD TBD TBD
15-minute headway each direction
n Full- and Part-time shifts
Factors affecting the actual costs include the general operation and administrative costs by a professional transit provider, type and number of vehicles to operate an effective system with the desired 15-minute frequencies, transit stop improvements. The cost estimate does not include potential future infrastructure improvements to support alternative (i.e., electric) fuel vehicles. Purchasing and contracts associated with the pilot program will follow City solicitation and procurement policies.

Funding for a pilot program is available for one-year only using a combination of local return transportation funds, including Proposition A and Measure M funds. All local, state and federal transportation funding requires that services be open to the general public without discrimination and cannot be exclusive to one subset of the population.

Depending on the option selected and the duration of the pilot program, additional funding appropriation will be necessary for fiscal year 2024/25 and beyond. Additional study will be required to understand the capital and operations financial needs and revenue options to sustain a long-term, ongoing transit system.

AATTACHMENT T
T
A
C
H
M
E
NT 1 1

CITY OF BEVERLY HILLS

PUBLIC WORKS DEPARTMENT

MEMORANDUM
City Council and Traffic and Parking Commission Liaison Committee Daren Grilley, Assistant Director/City EngineerNovember 14, 2022Beverly Hills Transit Feasibility Study and Neighborhood Traffic CalmingProgram Update

1. October 6, 2022 Transit Feasibility Study Report

2. November 3, 2022 Neighborhood Traffic Calming Program Report TO:

FROM:DATE:

SUBJECT:

ATTACHMENT:

RECOMMENDATION
Staff recommends that the City Council and Traffic and Parking Commission Liaison Committee receive progress updates on the Transit Feasibility Study and Draft Neighborhood Traffic CalmingProgram (NTCP), and provide feedback and direction to staff on next steps for each of theseinitiatives.

INTRODUCTIONOn April 20, 2021, the City Council adopted the Complete Streets Plan that includes goals and policies that will guide the City in building a safe, convenient and environmentally responsible transportation system serving multiple modes of travel, including driving, walking, cycling andtransit (www.beverlyhills.org/completestreets). Goals of the Complete Streets Plan include:
• Providing First/Last Mile Connections• Improving Transit Rider Experiences• Increasing Transit Ridership• Supporting Safe, Complete, Livable, Sustainable and Quality Neighborhoods Specific policies in support of these goals include exploring a fast, reliable transit shuttle with connections to the upcoming Purple (D) Line subway stations and developing a comprehensive neighborhood traffic calming toolbox for residential neighborhoods.

This report summarizes the progress towards implementing these policies.

DISCUSSION
Transit Feasibility Study
At their March 15, 2022 study session, the City Council directed staff to begin developing a transit service plan with the Traffic and Parking Commission (TPC) as the advisory body. With theassistance of the transportation consulting firm, Kittelson & Associates, Inc., a transit needsassessment, including public surveys and outreach, was conducted between July and September2022.

The findings of the Transit Study were presented at the October 6, 2022 TPC meeting (Attachment 1). The Commission supported the recommendation by staff and Kittelson & Associates to TO:

FROM: DATE:

SUBJECT:

ATTACHMENT:

CITY OF BEVERLY HILLS

PUBLIC WORKS DEPARTMENT

MEMORANDUM
City Council and Traffic and Parking Commission Liaison Committee Daren Grilley, Assistant Director/City Engineer November 14, 2022 Beverly Hills Transit Feasibility Study and Neighborhood Traffic Calming Program Update

1. October 6, 2022 Transit Feasibility Study Report

2. November 3, 2022 Neighborhood Traffic Calming Program Report RECOMMENDATION Staff recommends that the City Council and Traffic and Parking Commission Liaison Committee receive progress updates on the Transit Feasibility Study and Draft Neighborhood Traffic Calming Program (NTCP), and provide feedback and direction to staff on next steps for each of these initiatives. INTRODUCTION
On April 20, 2021, the City Council adopted the Complete Streets Plan that includes goals and policies that will guide the City in building a safe, convenient and environmentally responsible transportation system serving multiple modes of travel, including driving, walking, cycling and transit (www.beverlyhills.org/completestreets). Goals of the Complete Streets Plan include:
• Providing First/Last Mile Connections • Improving Transit Rider Experiences • Increasing Transit Ridership • Supporting Safe, Complete, Livable, Sustainable and Quality Neighborhoods Specific policies in support of these goals include exploring a fast, reliable transit shuttle with connections to the upcoming Purple (D) Line subway stations and developing a comprehensive neighborhood traffic calming toolbox for residential neighborhoods.

This report summarizes the progress towards implementing these policies.

DISCUSSION
Transit Feasibility Study
At their March 15, 2022 study session, the City Council directed staff to begin developing a transit service plan with the Traffic and Parking Commission (TPC) as the advisory body. With the assistance of the transportation consulting firm, Kittelson & Associates, Inc., a transit needs assessment, including public surveys and outreach, was conducted between July and September 2022. The findings of the Transit Study were presented at the October 6, 2022 TPC meeting (Attachment 1). The Commission supported the recommendation by staff and Kittelson & Associates to develop a pilot project for City Council to consider that would consist of one fixed circulator route operating with high frequency (e.g. 15-minute headways) south of North Santa Monica Boulevard, along with demand-based Microtransit that would serve residential areas.Staff is refining the proposed circulator route, including potential stops, which will be presented to the public for input in November-December. A detailed outline of the proposed transit pilot projectwill be presented to the TPC in January, followed by the City Council. If supported, an REP would be issued with the goal of beginning operation of a 12-24 month long pilot project by June 2023.

Neighborhood Traffic Calming Program
At the October 7, 2021 TPC meeting staff presented 16 potential traffic calming measures to consider including in the City’s Traffic Calming Toolbox, which serves as a resource to identify traffic calming options that are applicable to address the traffic-related concerns in a specific location. The TPC supported inclusion of all measures as potential options for neighborhoods torequest on their streets.

At the May 5, 2022 TPC meeting, staff presented industry best practices in NTCPs, as well as policies, procedures, and considerations from the peer cities of Hayward, Glendale, and Encinitas to inform development of a NTCP for Beverly Hills. The Commissioners provided feedback on project initiation, screening, thresholds of community support, approval, and evaluation, which staff incorporated into the Beverly Hills Draft NTCP.

The Draft NTCP, which combines the traffic calming toolbox with the recommended policies and implementation procedures, was made available for public comment from mid-September throughmid-October, and presented to the TPC at their November 3, 2022 meeting (Attachment 2).

Commission comments will be incorporated and the Draft NTCP will be brought to the City Council for consideration in early 2023.

Community Outreach
The City’s Communications team engaged in multiple layers of outreach to solicit participation inthe transit survey and attendance at virtual and in-person community meetings. The outreach—described in detail starting on page 5 of Attachment 1—included newspaper ads, citywide mailings, email blasts, posted signs at transit stops, promotion at City meetings and special events, social media posts, and informational flyers at public counters and on City Dial-A-Rideshuttles.

The City released the Draft NTCP for community review September 16-October 14, 2022 via the project website www.beverlyhills.orc/trafficcalminq. To get the word out, staff mailed a citywidepostcard, distributed a press release, published ads in the newspapers, posted on social media, and emailed community groups. Community members were asked to provide comments viaemail, phone, or through a form on the website.

FISCAL IMPACT
The fiscal impacts for the Transit Pilot Project and the NTCP are discussed in the attached reports. develop a pilot project for City Council to consider that would consist of one fixed circulator route operating with high frequency (e.g. 15-minute headways) south of North Santa Monica Boulevard, along with demand-based Microtransit that would serve residential areas.

Staff is refining the proposed circulator route, including potential stops, which will be presented to the public for input in November-December. A detailed outline of the proposed transit pilot project will be presented to the TPC in January, followed by the City Council. If supported, an RFP would be issued with the goal of beginning operation of a 12-24 month long pilot project by June 2023. Neighborhood Traffic Calming Program At the October 7, 2021 TPC meeting staff presented 16 potential traffic calming measures to consider including in the City's Traffic Calming Toolbox, which serves as a resource to identify traffic calming options that are applicable to address the traffic-related concerns in a specific location. The TPC supported inclusion of all measures as potential options for neighborhoods to request on their streets.

At the May 5, 2022 TPC meeting, staff presented industry best practices in NTCPs, as well as policies, procedures, and considerations from the peer cities of Hayward, Glendale, and Encinitas to inform development of a NTCP for Beverly Hills. The Commissioners provided feedback on project initiation, screening, thresholds of community support, approval, and evaluation, which staff incorporated into the Beverly Hills Draft NTCP.

The Draft NTCP, which combines the traffic calming toolbox with the recommended policies and implementation procedures, was made available for public comment from mid-September through mid-October, and presented to the TPC at their November 3, 2022 meeting (Attachment 2).

Commission comments will be incorporated and the Draft NTCP will be brought to the City Council for consideration in early 2023.

Community Outreach
The City's Communications team engaged in multiple layers of outreach to solicit participation in the transit survey and attendance at virtual and in-person community meetings. The outreachdescribed in detail starting on page 5 of Attachment 1-included newspaper ads, citywide mailings, email blasts, posted signs at transit stops, promotion at City meetings and special events, social media posts, and informational flyers at public counters and on City Dial-A-Ride shuttles.

The City released the Draft NTCP for community review September 16-October 14, 2022 via the project website www.beverlyhills.org/trafficcalming. To get the word out, staff mailed a citywide postcard, distributed a press release, published ads in the newspapers, posted on social media, and emailed community groups. Community members were asked to provide comments via email, phone, or through a form on the website. FISCAL IMPACT The fiscal impacts for the Transit Pilot Project and the NTCP are discussed in the attached reports.

Attachment Atta
c
h
m
e
nt 1 1
IL7
C

CITY OF BEVERLY HILLS

PUBLIC WORKS DEPARTMENT

TRAFFIC AND PARKING COMMISSION
Traffic and Parking Commission
Daren Grilley, Assistant Director/City EngineerMartha Eros, Transportation Planner October 6, 2022
Beverly Hills Transit Feasibility Study

1. Draft Transit Feasibility Study and Unmet Needs Assessment and Suitability Analysis Technical Memorandum

2. Community Outreach Mailer
TO:

FROM:DATE:

SUBJECT:

ATTACHMENT:

RECOMMENDATIONStaff recommends that the Traffic and Parking Commission review the attached draft TransitFeasibility Study and Unmet Needs Assessment and Suitability Analysis Technical Memorandum and consider the recommendation to develop a pilot program consisting of a combination of fixed route and microtransit.

INTRODUCTION
At their March 15, 2022 study session, the City Council directed staff to begin developing a transit service plan with the Traffic and Parking Commission (Commission) as the advisory body. At the April 7, 2022 Commission meeting, staff outlined a scope of work for a transit needs assessment analysis to identify opportunities for future transit system connections.

The adopted 2021 Complete Streets Plan identifies first-last mile opportunities for the Metro Purple Line (Line D) subway stations in Beverly Hills, including micro transit systems. Continued support by the Commission and advocacy from the CAC spearheaded the commission of a transit feasibility study to identify appropriate transit systems/services based on current and future transit growth.

DISCUSSION
In June 2022, the transportation planning firm of Kittelson & Associates Inc. (Kittelson) was engaged to prepare the transit needs assessment, which will serve as the foundation for the implementation and operation of a citywide transit system.Fundamental first steps of the transit feasibility study include:
• Gather stakeholder and public input• Understand transit needs in the community• Analyze existing transit services to identify gaps/unmet needs• Identify the goals, objectives and options of new transit service TO:

FROM: DATE:

SUBJECT:

ATTACHMENT:

CITY OF BEVERLY HILLS

PUBLIC WORKS DEPARTMENT

TRAFFIC AND PARKING COMMISSION
Traffic and Parking Commission
Daren Grilley, Assistant Director/City Engineer
Martha Eros, Transportation Planner
October 6, 2022
Beverly Hills Transit Feasibility Study

1. Draft Transit Feasibility Study and Unmet Needs Assessment and Suitability Analysis Technical Memorandum

2. Community Outreach Mailer

RECOMMENDATION
Staff recommends that the Traffic and Parking Commission review the attached draft Transit Feasibility Study and Unmet Needs Assessment and Suitability Analysis Technical Memorandum and consider the recommendation to develop a pilot program consisting of a combination of fixed route and microtransit. INTRODUCTION
At their March 15, 2022 study session, the City Council directed staff to begin developing a transit service plan with the Traffic and Parking Commission (Commission) as the advisory body. At the April 7, 2022 Commission meeting, staff outlined a scope of work for a transit needs assessment analysis to identify opportunities for future transit system connections. The adopted 2021 Complete Streets Plan identifies first-last mile opportunities for the Metro Purple Line (Line D) subway stations in Beverly Hills, including micro transit systems. Continued support by the Commission and advocacy from the CAC spearheaded the commission of a transit feasibility study to identify appropriate transit systems/services based on current and future transit growth.

DISCUSSION
In June 2022, the transportation planning firm of Kittelson & Associates Inc. (Kittelson) was engaged to prepare the transit needs assessment, which will serve as the foundation for the implementation and operation of a citywide transit system. Fundamental first steps of the transit feasibility study include:
• Gather stakeholder and public input • Understand transit needs in the community • Analyze existing transit services to identify gaps/unmet needs • Identify the goals, objectives and options of new transit service Community Outreach/Needs Assessment
Two community outreach meetings were conducted in late August/early September withapproximately 12 participants attending either the virtual or in-person sessions, and approximately430 surveys were received in response to a transit survey released on June 20. A summary of the responses include:
• Approximately 28% (118 of 430) of respondents indicated that they are current or past riders of transit within the City; 43% (184) indicated no experience as transit riders and expressed an interest in using public transit in the future; 29% (124) indicated no interest in using public transportation.
• Approximately 35% (41 of 118) of those identifying as transit users rated current transit services within the City as ‘very good” or “good.”
• Conditions or “barriers” cited against using public transit include the following, from most significant to least significant:• Existing transit services take too long or do not run on time• Transfers are confusing, time consuming, or costly • Public transportation does not operate near (my) home• Transit stops are too far from (my) trip origin or destination • Several travel corridors highlighted by users in the interactive mapping survey:
• North-South Corridors: Rodeo, Beverly, Canon, Rexford Drives; Robertson Boulevard• East-West Corridors: Santa Monica, Olympic, Beverly Boulevards • Frequent location types cited by users included medical facilities such as urgent cares and Cedars-Sinai Medical Center, parks, public schools, commercial/retail areas (e.g. coffeeshops and restaurants), civic centers (e.g. post office, library), and religious institutions.

Westside Transit Operators
In addition to conducting community outreach meetings, the Kittelson team conducted individual interviews with Westside transit stakeholders, including the Cities of West Hollywood and CulverCity to gather insight on local transit services serving each community, and with the Metro Westside planning group for NextGen operations and next steps. Each organization indicatedtransit ridership is trending toward shorter, faster trips with higher frequency.

West HollywoodThe City of West Hollywood operates a combination of fixed route service to supplement the Metrotransit network and specialized on-demand service for individuals over 62 years and disabled persons of all ages. In June 2022, the City Council approved a staff proposal to explore amicrotransit pilot project to transition away from dial-a-ride system to provide a general-publicmicrotransit service with priority given to seniors and residents with disabilities served by the current dial-a-ride program. While trips will still be offered to qualifying populations for free, West Hollywood plans to charge non-qualifying riders a fare. Since West Hollywood shares a border and a transit contract with Beverly Hills, there is great opportunity to improve connections between the two cities.

Community Outreach/Needs Assessment
Two community outreach meetings were conducted in late August/early September with approximately 12 participants attending either the virtual or in-person sessions, and approximately 430 surveys were received in response to a transit survey released on June 20. A summary of the responses include:
• Approximately 28% (118 of 430) of respondents indicated that they are current or past riders of transit within the City; 43% (184) indicated no experience as transit riders and expressed an interest in using public transit in the future; 29% (124) indicated no interest in using public transportation.
• Approximately 35% ( 41 of 118) of those identifying as transit users rated current transit services within the City as "very good" or "good."
• Conditions or "barriers" cited against using public transit include the following, from most significant to least significant: • Existing transit services take too long or do not run on time • Transfers are confusing, time consuming, or costly • Public transportation does not operate near (my) home • Transit stops are too far from (my) trip origin or destination • Several travel corridors highlighted by users in the interactive mapping survey:
• North-South Corridors: Rodeo, Beverly, Canon, Rexford Drives; Robertson Boulevard • East-West Corridors: Santa Monica, Olympic, Beverly Boulevards • Frequent location types cited by users included medical facilities such as urgent cares and Cedars-Sinai Medical Center, parks, public schools, commercial/retail areas (e.g. coffee shops and restaurants), civic centers (e.g. post office, library), and religious institutions.

Westside Transit Operators
In addition to conducting community outreach meetings, the Kittelson team conducted individual interviews with Westside transit stakeholders, including the Cities of West Hollywood and Culver City to gather insight on local transit services serving each community, and with the Metro Westside planning group for NextGen operations and next steps. Each organization indicated transit ridership is trending toward shorter, faster trips with higher frequency.

West Hollywood The City of West Hollywood operates a combination of fixed route service to supplement the Metro transit network and specialized on-demand service for individuals over 62 years and disabled persons of all ages. In June 2022, the City Council approved a staff proposal to explore a microtransit pilot project to transition away from dial-a-ride system to provide a general-public microtransit service with priority given to seniors and residents with disabilities served by the current dial-a-ride program. While trips will still be offered to qualifying populations for free, West Hollywood plans to charge non-qualifying riders a fare. Since West Hollywood shares a border and a transit contract with Beverly Hills, there is great opportunity to improve connections between the two cities.

Culver City
In 2017, the City of Culver City completed its Transit Oriented Development (TOD) Visioning Study and Recommendations report, with a vision of refocusing its mobility planning approach toinclude all modes of travel, including walking/pedestrians, transit, bicycles, and automobile traffic.

As a result of the study, the MOVE Culver City project came to fruition with the goal of improving transit connections throughout the City’s urban core and Expo Station area, and to improve the bus transit experience to encourage more transit use.

In November 2021, Culver City introduced an electric, low-floor minibus circulator scheduled to run every 10 minutes at peak times and every 15 minutes off-peak. The intent behind the addition of the circulator to the Move Culver City pilot project, as well as the use of converted electric passenger vans instead of conventional transit buses, was to help make service more accessible and convenient for residents and reduce the stigma of riding transit. During the school year, additional circulator routes that serve Culver City Middle School and High School are now offeredfollowing advocacy and support by the Culver City Unified School District and parents.

Los Ancieles County MetroFollowing 400+ community outreach events over a two year period, Metro launched its countywideNextGen Plan with the goal of providing 10-minute or less headways and restructuring the busline network to focus on local service. The four regional Metro lines operating within the Beverly Hills city limits are confined to major arterial streets. To address transit gaps, Metro launched a three-year micro-transit pilot program (similar to a shared on-demand service such as Lyft) totransport riders within 2-3 miles from major transit centers to key destinations. Currently, Metro microtransit service is operating in Westwood to address high student ridership demands.Service Options for Consideration Beverly Hills is well-suited for a variety of transit options, with a compact footprint, a grid pattern street network (south of Sunset Boulevard), and a mix of land uses that provides consistent allday sources of travel demand. In all instances, it is recommended that any service be offered in the form of a limited pilot period under the administration of the City of Beverly Hills. This will offerthe City the ability to explore alternatives more quickly and respond more quickly to needs that may not have been able to be considered by this study or in existence at the time of this study.

Two complementary options are best suited for consideration of a City-managed transit service pilot project:
• Fixed-route transit• Microtransit
Fixed RouteFixed route transit operates like conventional public transportation as seen within Beverly Hills today provided by Metro, operating defined routes on defined schedules, serving defined stops.

Public input received over the course of the study indicates that public interest is for fast connection into the upcoming Metro D (Purple) Line stations schedule to open in calendar year2024 on Wilshire Boulevard at La Cienega Boulevard and Rodeo Drive. The greatest transitcirculation need within the community is for north-south connectivity, as identified throughcommunity input and LA Metro peer discussions (Attachment-i, Figure 7).

Fixed-route transit propensity is greatest from Santa Monica Boulevard to the south of the city, as the intensity of commercial activity and greater relative density provides the concentration of residents and commercial points of interest that offers the greatest potential ridership base.

The residential land use patterns north of Santa Monica Boulevard are traditionally associated with lower all-day transit propensity and utilization, and it is not evident through public outreach Culver City
In 2017, the City of Culver City completed its Transit Oriented Development (TOD) Visioning Study and Recommendations report, with a vision of refocusing its mobility planning approach to include all modes of travel, including walking/pedestrians, transit, bicycles, and automobile traffic.

As a result of the study, the MOVE Culver City project came to fruition with the goal of improving transit connections throughout the City's urban core and Expo Station area, and to improve the bus transit experience to encourage more transit use.

In November 2021, Culver City introduced an electric, low-floor minibus circulator scheduled to run every 10 minutes at peak times and every 15 minutes off-peak. The intent behind the addition of the circulator to the Move Culver City pilot project, as well as the use of converted electric passenger vans instead of conventional transit buses, was to help make service more accessible and convenient for residents and reduce the stigma of riding transit. During the school year, additional circulator routes that serve Culver City Middle School and High School are now offered following advocacy and support by the Culver City Unified School District and parents.

Los Angeles County Metro Following 400+ community outreach events over a two year period, Metro launched its countywide NextGen Plan with the goal of providing 10-minute or less headways and restructuring the bus line network to focus on local service. The four regional Metro lines operating within the Beverly Hills city limits are confined to major arterial streets. To address transit gaps, Metro launched a three-year micro-transit pilot program (similar to a shared on-demand service such as Lyft) to transport riders within 2-3 miles from major transit centers to key destinations. Currently, Metro microtransit service is operating in Westwood to address high student ridership demands. Service Options for Consideration Beverly Hills is well-suited for a variety of transit options, with a compact footprint, a grid pattern street network (south of Sunset Boulevard), and a mix of land uses that provides consistent allday sources of travel demand. In all instances, it is recommended that any service be offered in the form of a limited pilot period under the administration of the City of Beverly Hills. This will offer the City the ability to explore alternatives more quickly and respond more quickly to needs that may not have been able to be considered by this study or in existence at the time of this study. Two complementary options are best suited for consideration of a City-managed transit service pilot project:
• Fixed-route transit • Microtransit
Fixed Route Fixed route transit operates like conventional public transportation as seen within Beverly Hills today provided by Metro, operating defined routes on defined schedules, serving defined stops.

Public input received over the course of the study indicates that public interest is for fast connection into the upcoming Metro D (Purple) Line stations schedule to open in calendar year 2024 on Wilshire Boulevard at La Cienega Boulevard and Rodeo Drive. The greatest transit circulation need within the community is for north-south connectivity, as identified through community input and LA Metro peer discussions (Attachment-1, Figure 7).

Fixed-route transit propensity is greatest from Santa Monica Boulevard to the south of the city, as the intensity of commercial activity and greater relative density provides the concentration of residents and commercial points of interest that offers the greatest potential ridership base. The residential land use patterns north of Santa Monica Boulevard are traditionally associated with lower all-day transit propensity and utilization, and it is not evident through public outreach that there is an unmet demand in this portion of the city. To ensure citywide transit opportunities, this area may be better served by alternative service, such as microtransit (discussed below).

From the community survey and public workshop feedback in addition to lessons learned from Culver City, there is also evidence to suggest time-limited fixed route service could be effectiveduring morning and afternoon peak-hour activity to connect parts of the city with the greatest concentrations of enrolled students to Beverly Hills High School. Additionally, exploring extended fixed-route, commute-oriented service to connect the Flats region to the upcoming Metro D Line stations as part of a pilot program may be considered for future testing.

M icrotransitMicrotransit is an emerging technology option that offers promise for geographies/terrain more challenging for fixed-route transit or defined zones with lower densities adjacent to areasotherwise favorable for a more conventional transit service, utilizing new technologies to offer ondemand routing between more widely spaced origins and destinations using smaller transitvehicles.

Within Beverly Hills, a microtransit pilot is likely to be the most successful service strategy for portions of the city north of Santa Monica Boulevard. Depending on the limitations of anyprospective partner (app) platform, it may be possible for the full portion of the city north of SantaMonica Boulevard to be served by a single microtransit zone.

As with fixed-route transit, network connectivity is critical to the success of any transit service, and limited specific connections into the regional network outside of the microtransit zone would be strongly advised, such as incorporating the future Metro D Line stations along Wilshire Boulevard as exclaves of the microtransit zone. If evidence of peak commute-oriented demand exists within the microtransit zone, it may be more efficient to instead operate peak service alonga fixed route to more efficiently capture demand and reduce overall trip times.

Next Steps
Based on the study recommendations, staff recommends developing a pilot program consisting of a combination of fixed route and microtransit service. If the Commission supports this recommendation, or similar variation of services, staff will move forward with developing details for the following considerations:
• Route(s) and stop locations• Operating hours• Performance standards (service frequency, safety issues, stop amenities, etc.) • Safety standards (in consultation with the Police Department)• Vehicle types, passenger capacity, and power options Staff would conduct additional outreach to get feedback on these details before returning to theCommission, tentatively in December 2022, for review and recommendation to the City Council.Public Outreach The City’s Communications team engaged in multiple layers of outreach to solicit participation inthe transit survey and attendance at the virtual and in-person community meetings, including:

Ads in BH Courier, BH Weekly, and BH Press Beverly Hills Unified School District and PTA (transit survey participation and community social media posts and partnership outreach meetings)
that there is an unmet demand in this portion of the city. To ensure citywide transit opportunities, this area may be better served by alternative service, such as microtransit (discussed below).

From the community survey and public workshop feedback in addition to lessons learned from Culver City, there is also evidence to suggest time-limited fixed route service could be effective during morning and afternoon peak-hour activity to connect parts of the city with the greatest concentrations of enrolled students to Beverly Hills High School. Additionally, exploring extended fixed-route, commute-oriented service to connect the Flats region to the upcoming Metro D Line stations as part of a pilot program may be considered for future testing.

Microtransit Microtransit is an emerging technology option that offers promise for geographies/terrain more challenging for fixed-route transit or defined zones with lower densities adjacent to areas otherwise favorable for a more conventional transit service, utilizing new technologies to offer ondemand routing between more widely spaced origins and destinations using smaller transit vehicles. Within Beverly Hills, a microtransit pilot is likely to be the most successful service strategy for portions of the city north of Santa Monica Boulevard. Depending on the limitations of any prospective partner (app) platform, it may be possible for the full portion of the city north of Santa Monica Boulevard to be served by a single microtransit zone.

As with fixed-route transit, network connectivity is critical to the success of any transit service, and limited specific connections into the regional network outside of the microtransit zone would be strongly advised, such as incorporating the future Metro D Line stations along Wilshire Boulevard as exclaves of the microtransit zone. If evidence of peak commute-oriented demand exists within the microtransit zone, it may be more efficient to instead operate peak service along a fixed route to more efficiently capture demand and reduce overall trip times.

Next Steps
Based on the study recommendations, staff recommends developing a pilot program consisting of a combination of fixed route and microtransit service. If the Commission supports this recommendation, or similar variation of services, staff will move forward with developing details for the following considerations:
• Route(s) and stop locations • Operating hours • Performance standards (service frequency, safety issues, stop amenities, etc.) • Safety standards (in consultation with the Police Department) • Vehicle types, passenger capacity, and power options Staff would conduct additional outreach to get feedback on these details before returning to the Commission, tentatively in December 2022, for review and recommendation to the City Council.

Public Outreach
The City's Communications team engaged in multiple layers of outreach to solicit participation in the transit survey and attendance at the virtual and in-person community meetings, including:

Ads in BH Courier, BH Weekly, and BH Press
(transit survey participation and community outreach meetings) Beverly Hills Unified School District and PTA social media posts and partnership City social media posts, including a personal re- E-blast notices to approximately 1,200 Complete post by Councilmember Nazarian Streets email subscribersCitywide mailer announcing community meeting Promote on landing page of City website, dates and survey information to all households and calendar of events and project page businesses (www.bevelryhills.org/transitstudy)Post information flyers at 20 high-use Metro bus Promoting project at City events, including the stops along Wilshire Blvd and Beverly Drive Climate Action Committee Movie Night, Concerts on Canon series, Sunday Farmers’ Market
TPC monthly updates and public comment forum Public Works Commission presentation CAAC Advisory Committee updates Beverly Hills Active Adult Club (BHAAC) board presentation
Metro Purple Line monthly community outreach Posted flyers on senior Dial-A-Ride shuttlesmeeting Information flyers distributed at all city public Internal City employee newsletter and emails counters
A total of 430 surveys were submitted as a result of the extensive public outreach. The cost of outreach efforts totaled approximately $20,000 for newspaper advertisements, citywide mailers, newspaper advertisements and social media posts.FISCAL IMPACT The preliminary estimated cost is approximately $3.5 million for a one-year pilot program with one microtransit vehicle and one circulator route as described in the study. Factors affecting the actual costs include the general operation and administrative costs by a professional transit provider, type and number of vehicles to operate an effective system with the desired number of routes andfrequencies, transit stop improvements, infrastructure to support alternative fuel vehicles.

Purchasing and contracts associated with the pilot program will follow City solicitation andprocurement policies.Funding is currently available to start a pilot program using local return transportation funds.Depending on the option selected and the duration of the pilot program, additional funding appropriation will be necessary for fiscal year 2023/24. Additional study will be required to understand the capital and operations funding needs and revenue options to sustain a long-term, ongoing transit system.

City social media posts, including a personal repost by Councilmember Nazarian Citywide mailer announcing community meeting dates and survey information to all households and businesses Post information flyers at 20 high-use Metro bus stops along Wilshire Blvd and Beverly Drive
TPC monthly updates and public comment forum
CAAC Advisory Committee updates
Metro Purple Line monthly community outreach meeting
Information flyers distributed at all city public
counters
E-blast notices to approximately 1,200 Complete
Streets email subscribers
Promote on landing page of City website,
calendar of events and project page (www.bevelryhills.org/transitstudy) Promoting project at City events, including the
Climate Action Committee Movie Night, Concerts on Canon series, Sunday Farmers' Market Public Works Commission presentation Beverly Hills Active Adult Club (BHAAC) board presentation Posted flyers on senior Dial-A-Ride shuttles Internal City employee newsletter and emails A total of 430 surveys were submitted as a result of the extensive public outreach. The cost of outreach efforts totaled approximately $20,000 for newspaper advertisements, citywide mailers, newspaper advertisements and social media posts. FISCAL IMPACT The preliminary estimated cost is approximately $3.5 million for a one-year pilot program with one microtransit vehicle and one circulator route as described in the study. Factors affecting the actual costs include the general operation and administrative costs by a professional transit provider, type and number of vehicles to operate an effective system with the desired number of routes and frequencies, transit stop improvements, infrastructure to support alternative fuel vehicles. Purchasing and contracts associated with the pilot program will follow City solicitation and procurement policies. Funding is currently available to start a pilot program using local return transportation funds. Depending on the option selected and the duration of the pilot program, additional funding appropriation will be necessary for fiscal year 2023/24. Additional study will be required to understand the capital and operations funding needs and revenue options to sustain a long-term, ongoing transit system.

KI TTE LSON 3919 30th Street, Suite 107 San Diego, CA 92104 &ASSOCIATES P74.468.1180 Technical Memorandum
September 30, 2022 Project# 27708
To: Martha Eros, Transportation Planner
City of Beverly Hills455 N Rexford Dr
Beverly Hills, CA 90210
From: Peter Casellini, AICP; Fernando Sotelo, TE; Allison Woodworth; Sam Liu, EITRE’ Beverly Hills Transit Needs Assessment Study Unmet Needs Assessment and Suitability Analysis
Kittelson & Associates, Inc. (Kittelson) is working with the City of Beverly Hills (City) to determine whether the current and future planned transit services are sufficient to support the needs of Beverly Hills residents, workers, and visitors. This memorandum summarizes the community needs expressed by the public and peer agencies during community outreach efforts including the online survey, interactive mapping exercise, and public meetings, and provides initial recommendations to direct future transit planning efforts by the City based on the results of the community needs analysis and current industry best practices.

Contents
Introduction 1Online Survey Findings 3
Existing Regional and Local Transit Use 3
Regional trips 3
local trips 4
lntra- and inter-community transit travel 5
Interest 6
Satisfaction 7
Barriers to Transit 8
Destinations 9Limitations 12
Peer Agency Discussions 13
Los Angeles County Metropolitan Transportation Authority (Metro) 13 Existing Service 13Ridership Impacts from the Opening of the E (Expo) Line 16Limitations of and Opportunities for Service Enhancements 16 West Hollywood 17
Existing Service 17Ridership Trends Across Services 17
Kittelson & Associates, Inc.

Ir,· KITTELSON &ASSOCIATES 3919 30th Street. Suite 107 San Diego. CA 92104 P 714.468.1180 Technical Memorandum
September 30, 2022
To: Martha Eros, Transportation Planner
City of Beverly Hills 455 N Rexford Dr
Beverly Hills, CA 90210 Peter Casellini, AICP; Fernando Sotelo, TE; Allison Woodworth; Sam Liu, EIT Project# 27708
From:

RE:

Beverly Hills Transit Needs Assessment Study Unmet Needs Assessment and Suitability Analysis [INTRODUCTION
Kittelson & Associates, Inc. (Kittelson) is working with the City of Beverly Hills (City) to determine whether the current and future planned transit services are sufficient to support the needs of Beverly Hills residents, workers, and visitors. This memorandum summarizes the community needs expressed by the public and peer agencies during community outreach efforts including the online survey, interactive mapping exercise, and public meetings, and provides initial recommendations to direct future transit planning efforts by the City based on the results of the community needs analysis and current industry best practices. Contents Introduction 1
Online Survey Findings 3
Existing Regional and Local Transit Use 3
Regional trips 3 local trips 4
Intra- and inter-community transit travel. 5
Interest 6
Satisfaction 7
Barriers to Transit 8 Destinations 9 Limitations 12
Peer Agency Discussions 13
Los Angeles County Metropolitan Transportation Authority (Metro) 13 Existing Service 13
Ridership Impacts from the Opening of the E (Expo) Line 16 Limitations of and Opportunities for Service Enhancements 16 West Hollywood 17
Existing Service 1 7 Ridership Trends Across Services 17 Kittelson & Associates, Inc.

September 30, 2022 Page 2
Unmet Needs Assessment and Suitability Analysis Introduction Upcoming Opportunities 18
Culver City 18
Existing Service 18Lessons Learned from E (Expo) Line Development 19 Move Culver City Initiative 19
Prospective Service Design and Mode Suitability Analysis 21 Prospective Service Design 21Fixed-Route Circulator 21
Microtransit 22
Options Not Currently Recommended for Further Consideration 24 Partnership With LA Metro 24Partnership With neighboring municipalities 25NEV Microtransit 25 TNC Subsidies 25Streetcar 26
Unmet Transit Needs 26
Gaps in Existing Transit Network 26
Key Destinations Identified from Outreach 27
Service Design Considerations 29
Principles of Service Design 29
Funding Sources 29
ADA Access and Bus Stops 30
Operational Considerations 31
Fundamentals 31
Contracting 31
Vehicles 32
Service Performance Measurement 33
Next Steps 33
Acknowledgements 34
Kittelson & Associates. Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 2 ends

Introduction
Upcoming Opportunities 18
Culver City 18
Existing Service 18 Lessons Learned from E (Expo) Line Development 19 Move Culver City Initiative 19
Prospective Service Design and Mode Suitability Analysis 21 Prospective Service Design 21 Fixed-Route Circulator 21 Micro transit 22 Options Not Currently Recommended for Further Consideration 24 Partnership With LA Metro 24 Partnership With neighboring municipalities 25 NEV Microtransit 25 TNC Subsidies 25
Streetcar 26
Unmet Transit Needs 26
Gaps in Existing Transit Network 26
Key Destinations Identified from Outreach 27
Service Design Considerations 29
Principles of Service Design 29 Funding Sources 29
ADA Access and Bus Stops 30
Operational Considerations 31
Fundamentals 31
Contracting 31 Vehicles 32
Service Performance Measurement 33
Next Steps 33
Acknowledgements 34
Kittelson & Associates, Inc.

September 30, 2022 Page 3
Unmet Needs Assessment and Suitability Analysis Online Survey Findings

I ONLINE SURVEY FINDINGS
The City developed a Mobility Needs Survey to understand how people who work, live, and recreate in Beverly Hills travel around the community and how they imagine doing so in the future. The survey recorded the demographics of respondents; explored their past and current experiences using publictransit to travel to, from, and within Beverly hills; and solicited opinions on how to improve transit within thecommunity — from serving new destinations to addressing commonly identified barriers to using the existingsystem.

The survey (Appendix A) was published online via Survey Monkey and publicized through the City’swebsite, two project public meetings, traditional and social media, City hosted events (such as the Farmers’ Market), flyers at high activity Metro bus stops within the city, and e-blasts. A full list of outreach distribution strategies will be summarized in the Outreach Memo.

In order to capture broader perspectives on mobility and retain the ability to solicit feedback on existing services from current riders, some survey questions were asked only of existing or interested transit riders andothers only of people who responded that they did not expect to ever use public transit in the city.

The following sections explore the who, where, how, why, and why not of the public transit landscape in Beverly Hills, the answers to which provide a framework for analyzing the City’s unmet transit needs.

Existing Regional and Local Transit Use

REGIONAL TRIPS
Several transit services operate near or within Beverly Hills and provide inter-community and larger regional connectivity. These travel patterns may indicate connection opportunities for potential future local services.

Metro, LADOT, and Big Blue Bus accounted for the highest percentage of daily, several times a week, oroccasional trips on the regional options listed (Figure 1). The most common frequency cited for riding anyof the regional transit services was occasionally”. 1 “Never” accounted for over 80 percent of thefrequency responses across all regional services. ‘This question received a nearly 100 percent response rate tram the over 400 survey users. “Other” write in answers included Metrolink, WeHo F’ickUp, and Metro bikeshare. This question was open to all respondents.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

I ONLINE SURVEY FINDINGS

Page 3 ends

Online Survey Findings
The City developed a Mobility Needs Survey to understand how people who work, live, and recreate in Beverly Hills travel around the community and how they imagine doing so in the future. The survey recorded the demographics of respondents; explored their past and current experiences using public transit to travel to, from, and within Beverly hills; and solicited opinions on how to improve transit within the community -- from serving new destinations to addressing commonly identified barriers to using the existing system.

The survey (Appendix A) was published online via Survey Monkey and publicized through the City's website, two project public meetings, traditional and social media, City hosted events (such as the Farmers' Market), flyers at high activity Metro bus stops within the city, and e-blasts. A full list of outreach distribution strategies will be summarized in the Outreach Memo.

In order to capture broader perspectives on mobility and retain the ability to solicit feedback on existing services from current riders, some survey questions were asked only of existing or interested transit riders and others only of people who responded that they did not expect to ever use public transit in the city.

The following sections explore the who, where, how, why, and why not of the public transit landscape in Beverly Hills, the answers to which provide a framework for analyzing the City's unmet transit needs.

Existing Regional and Local Transit Use

REGIONAL TRIPS
Several transit services operate near or within Beverly Hills and provide inter-community and larger regional connectivity. These travel patterns may indicate connection opportunities for potential future local services.

Metro, LADOT, and Big Blue Bus accounted for the highest percentage of daily, several times a week, or occasional trips on the regional options listed (Figure 1). The most common frequency cited for riding any of the regional transit services was "occasionally". 1 "Never" accounted for over 80 percent of the frequency responses across all regional services. 1 This question received a nearly 100 percent response role from the over 400 survey users. "Other" write in answers included Metrolink, WeHo PickUp, and Metro bikeshare. This question was open lo all respondents. Kittelson & Associates, Inc.

September 30. 2022
Unmet Needs Assessment and Suitability Analysis

Page 4 ends

Online Survey Findings
Figure 1 Regional Transit Use
12000% -- - — 10000%
Which public transportation services do you use to
get around the Region today, and how often?
—
—-—-—---—
— _.—[ — Los Angeles Bus Antelope Big Blue Bus Culver CilyBus West Hollywood Metro Department of Valley Citylise Transportation Transit Authonty (LADOT) (AVTA)

LOCAL TRIPS
• everyday
Three core public transit services exist within the City and serve local trips currently. Survey users that indicated they had previously taken transit within Beverly Hills were asked which of these services they rideand how often.2 Respondents indicated that they use Metro overwhelmingly for most local trips (Figure 2).2 Roughly / of respondents 1991 answered or were eligible to answer this question. 80 00%60 00%40.00% -- 20.00%

0.00% - • several times a week occasionally • weekends only • never Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 4 ends

Online Survey Findings
Figure 1 Regional Transit Use
Which public transportation services do you use to
get around the Region today, and how often?
120 00%
■everyday
(fff% +
weekends
only
■ never
■ several times
a week
.1 occasionally
Culver c,tyBus West Hollywood Metro
Cityline
Bus Antelope Big Blue Bus
Valley
Transit Authonty
(AVTA)
f I
t
- - -- - -
- . _o n r .. �

20.00%+
ooo». Im
Los Angeles
Department of
Transportation
(LADOT)
40 00%
6000% 80.00%

LOCAL TRIPS
Three core public transit services exist within the City and serve local trips currently. Survey users that indicated they had previously taken transit within Beverly Hills were asked which of these services they ride and how often.? Respondents indicated that they use Metro overwhelmingly for most local trips (Figure 2). 2 Roughly '% of respondents (991 answered or were eligible lo answer this question.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 5 ends

Online Survey Findings
Figure 2 Local Transit Use and Frequency
Which services have you taken to get around Beverly
Hills and how often do you use them?
1izI
Metro

INTRA- AND INTER-COMMUNITY TRANSIT TRAVEL
Beverly Hills is part of a larger region that offers significant entertainment, recreation, and employment opportunities. Half of current transit riders indicated that they use transit for inter-community travel (outsideof Beverly Hills).3 While the remaining half of users indicated they take transit to access local destinations, only 14 percent of those riders started their trip within Beverly Hills (Figure 3). This does not necessarilyindicate that there is an insufficient market for new Beverly Hills transit services. It is possible that the riderscoming from outside the community may benefit from additional local connection options to expand theirgreater access to Beverly Hills businesses and entertainment districts.

This question was asked of only current transit riders
100.00% - 90.00%

80.00%70.00%

60.00%

50.00%

40.00%

30.00%20.00%

10.00%

0.00%
• everyday•several times a
week
occasionally
•weekends only
• never
Free Beverly Hills
Trolley
Beverly Hills Dial-A
Ride
Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 5 ends

Online Survey Findings ----- ------------------------------------ Figure 2 Local Transit Use and Frequency
Which services have you taken to get around Beverly
Hills and how often do you use them?
100.00%

90.00% 80.00% 70.00%

60.00%

50.00%

40.00%
3000% 20.00% +

10.00% + I

0.00% -
Free Beverly Hills Beverly Hills Dial-ATrolley Ride Metro everyday ■ several times a
week
occasionally
■ weekends only never
INTRA- AND INTER-COMMUNITY TRANSIT TRAVEL Beverly Hills is part of a larger region that offers significant entertainment, recreation, and employment opportunities. Half of current transit riders indicated that they use transit for inter-community travel (outside of Beverly Hills).3 While the remaining half of users indicated they take transit to access local destinations, only 14 percent of those riders started their trip within Beverly Hills (Figure 3). This does not necessarily indicate that there is an insufficient market for new Beverly Hills transit services. It is possible that the riders coming from outside the community may benefit from additional local connection options to expand their greater access to Beverly Hills businesses and entertainment districts. 3 This question was asked of only current transit riders Kittelson & Associates. Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 6 ends

Online Survey Findings
Interest
Just over a quarter of respondents indicated that they are current or past riders of transit within the City. Acombined 43 percent of respondents indicated no experience as local riders, but expressed an interest instarting in the future. The nearly three quarters of responses from existing or interested riders is a positiveindication toward a market for existing or new and improved services. The strong interest in taking transit when the Purple Line opens emphasizes the importance of ensuring that safe, convenient, and comfortable connections to and from the stations (often referred to as the “first mile I last mile”) areavailable to translate that demand into ridership.

Table 1 Have you used public transportation services in Beverly Hills? Responses

27.7%

0.0%

29.1%22.8%

20.4%
Figure 3 Intra- and Inter-Community Trip Demand
Which communities do you use public transit most
frequently to access?

60.00%

50.00%

40.00%

30.00%

20.00% - 14.29%

50.55%

35. 16%

10.00% - --------- ---.—---.- —- 0.00% L I .
most frequently take public transit to I most frequently take public transit to I most frequently take public transit to destinations within Beverly Hills (and I destinations outside of Beverly Hills destinations within Beverly Hills (and I started in Beverly Hills) (and I started in Beverly Hills) am coming from another community) AnswerChcesnswerChoices
Yes, I have used public transportation in Beverly Hills I rarely use public transportationI have never taken public transportation in Beverly Hills and I have no interest in starting’
I have never taken public transportation in Beverly Hills, but I am interested in starting’
I have never taken public transportation in Beverly Hills, but I plan to start when the Metro Purple Line stations open in the City.’
This question was open to all respondents.

This answer was used to determine the survey “skip logic” for follow up questions. These respondents were not asked questions specific to existing ridership behavior such as how they get to local transit stops.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis
Figure 3 Intra- and Inter-Community Trip Demand

Page 6 ends

Online Survey Findings
Which communities do you use public transit most
frequently to access?

60.00%

50.55%

50.00%

40.00%

30.00%

20.00%

10.00%

0.00%

14.29%

35.16%
I most frequently take public transit to I most frequently take public transit to I most frequently take public transit to destinations within Beverly Hills (and I destinations outside of Beverly Hills destinations within Beverly Hills (and I started in Beverly Hills) (and I started in Beverly Hills) am coming from another community) Interest
Just over a quarter of respondents indicated that they are current or past riders of transit within the City. A combined 43 percent of respondents indicated no experience as local riders, but expressed an interest in starting in the future. The nearly three quarters of responses from existing or interested riders is a positive indication toward a market for existing or new and improved services. The strong interest in taking transit when the Purple Line opens emphasizes the importance of ensuring that safe, convenient, and comfortable connections to and from the stations (often referred to as the "first mile / last mile") are available to translate that demand into ridership.

Table 1 Have you used public transportation services in Beverly Hills? [ Answer Choices
Yes, I have used public transportation in Beverly Hills I rarely use public transportation
Responses

27.7%

0.0%
I have never taken public transportation in Beverly Hills and I have no interest in 29.1% starting1
I have never taken public transportation in Beverly Hills, but I am interested in 22.8% starting1
I have never taken public transportation in Beverly Hills, but I plan to start when the 20.4% Metro Purple Line stations open in the City.1
This question was open to all respondents. This answer was used to determine the survey "skip logic" for follow up questions. These respondents were not asked questions specific to existing ridership behavior such as how they get to loco/ transit stops. Kittelson & Associates, Inc.

September 30, 2022 Page 7
Unmet Needs Assessment and Suitability Analysis Online Survey Findings To explore the scenarios in which the “I have never taken public transit in Beverly Hills’ cohort would consider riding, these respondents were asked “If frequent and reliable public transportation was available where you needed to go, how often would you take it?”. Under this scenario, nearly 40 percent of users indicated a likelihood of using public transit everyday or at least once a week Figure 4). Of the remaining 60 percent, roughly half (32 percent) indicated that they would consider transit for occasional use or to get to special events and 27 percent indicated they would still not consider transita viable mobility option. Overall, this suggests that transit may transform a percentage of the “I have never taken public transit in Beverly Hills” cohort into riders by operating a frequent and reliable service that provides access to popular community destinations.Figure 4 Willingness to Take Transit In Future If frequent and reliable public transportation was available where you needed to go - how often would you take it?

30.00%

25.00%20.00%

15.00%10.00%

5.00%0.00%
Everyday At least once Weekends Several times To special I do not think a week only a month events only I will ever
take public
transit
Satisfaction35 percent of users rated current transit services within the city as very good’ or “good” (Figure 5).

However, the modal response was a “fair” rating. The following section explores the barriers that riders experience which may contribute to the “fair” or “poor” ratings. This question was only asked of people who indicated they had taken public transit in Beverly Hills. —
Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 7 ends

Online Survey Findings
To explore the scenarios in which the "I have never taken public transit in Beverly Hills" cohort would consider riding, these respondents were asked "If frequent and reliable public transportation was available where you needed to go, how often would you take it?". Under this scenario, nearly 40 percent of users indicated a likelihood of using public transit everyday or at least once a week ( Figure 4). Of the remaining 60 percent, roughly half (32 percent) indicated that they would consider transit for occasional use or to get to special events and 27 percent indicated they would still not consider transit a viable mobility option. Overall, this suggests that transit may transform a percentage of the "I have never taken public transit in Beverly Hills" cohort into riders by operating a frequent and reliable service that provides access to popular community destinations. Figure 4 Willingness to Take Transit In Future If frequent and reliable public transportation was available where you needed to go - how often would you take it?

30.00% ,-------------------------------

25.00% -+---------------------------- 20.00%

15.00% 10.00%

5.00% 0.00%
Everyday At least once Weekends Several times To special I do not think a week only a month events only I will ever
take public
transit
Satisfaction
35 percent of users rated current transit services within the city as "very good" or "good" (Figure 5).

However, the modal response was a "fair" rating. The following section explores the barriers that riders experience which may contribute to the "fair" or "poor" ratings. This question was only asked of people who indicated they had taken public transit in Beverly Hills. Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 8 ends

Online Survey Findings
Figure 5 Satisfaction with Current Transit Services in Beverly Hills

45.00%
Overall, how would you rate the quality of existing
public transit services in Beverly Hills?

40.00%

35.00%

30.00%

25.00%20.00%

15.00%10.00%

5.00%0.00%
Very good Good Fair Poor
Barriers to Transit
Barriers to accessing or comfortably navigating a transit network prevent people from perceiving or experiencing transit as a viable and quality way to get around. This depresses transit ridership andundermines its ability to be a competitive transportation alternative. The “I have used public transit in Beverly Hills” cohort was asked to evaluate a list of barriers for relevance to their ridership experience (on a scale of “strongly disagree” to “strongly agree”)
Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis
Figure 5 Satisfaction with Current Transit Services in Beverly Hills Overall, how would you rate the quality of existing
public transit services in Beverly Hills?
Page8
Online Survey Findings

45.00% 40.00%

35.00% 30.00%

25.00% 20.00%

15.00% 10.00%

5.00% 0.00%
Very good
Barriers to Transit
Good Fair Poor
Barriers to accessing or comfortably navigating a transit network prevent people from perceiving or experiencing transit as a viable and quality way to get around. This depresses transit ridership and undermines its ability to be a competitive transportation alternative. The "I have used public transit in Beverly Hills" cohort was asked to evaluate a list of barriers for relevance to their ridership experience (on a scale of "strongly disagree" to "strongly agree") (
Kittelson & Associates, Inc.

September 30, 2022 Page 9
Unmet Needs Assessment and Suitability Analysis Online Survey Findings Figure 6). A weighted average was applied to these responses and resulted in the following barrier rankings from most significant to least:

1. Existing transit services take too long or do not run on time

2. Transfers are confusing, time consuming, or costly3. Public transportation does not go where I need to go or serve nearby my home4. Transit stops are too far from my common origins or destinations5. I do not understand how to use the system Additional barriers were provided via the write-in option. Comments highlighted difficulties accessing transitstations due to distances between the stops and the rider origin or destination; uncomfortable or unsafeconnections to transit for people walking, using a wheelchair, and biking; and safety concerns while ridingtransit.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis
Page9
Online Survey Findings
Figure 6). A weighted average was applied to these responses and resulted in the following barrier rankings from most significant to least:
l . Existing transit services take too long or do not run on time

2. Transfers are confusing, time consuming, or costly 3. Public transportation does not go where I need to go or serve nearby my home 4. Transit stops are too far from my common origins or destinations 5. I do not understand how to use the system Additional barriers were provided via the write-in option. Comments highlighted difficulties accessing transit stations due to distances between the stops and the rider origin or destination; uncomfortable or unsafe connections to transit for people walking, using a wheelchair, and biking; and safety concerns while riding transit.

Kittelson & Associates, Inc.

September30. 2022 Page 10
Unmet Needs Assessment and Suitability Analysis Online Survey FindingsFigure 6 Challenges Riding Public Transit (Asked of Transit Riders) What challenges do you face in riding transit in
Beverly Hills?

60.00%

50.00%

40.00%30.00%EE .Ii liii • illi liii
Public Transit stops are I do not Transfers are Existing transit transportation too far from my understand how confusing, time services take too does not go common origins to use the system consuming, or long or do not run where I need to or destinations costly on time
go or serve
nearby my home
• Strongly Disagree • Disagree • Agree • Strongly Agree Destinations
Determining where people want to go is an important aspect of understanding whether the current transit system is making those connections at all — agnostic of quality of service — or where future service may be most successful. The survey asked every user to list their “[up to] top three destinations when travelling within Beverly Hills’. This question received a 6] percent response rate and asked people to answer in comment form rather than selecting from a pre-determined list. All comments were compiled (regardless of whichorder the destinations were listed) and mapped. In addition, responses from the live exercise conductedduring the public workshops were preserved and added to the map. Figure 7 shows a concentration ofdestinations within and near the Golden Triangle and along Wilshire Blvd. Several travel corridors were highlighted by users:
e North-South Corridors4
o Rodeo Dro Beverly Dro Canon Dro Rexford Dr
o Robertson Blvd
• E-W Corridors
o Santa Monica Blvdo Olympic Blvdo Beverly Blvd
In most instances, corridors stated in responses did not indicate corridor segments, such as north or south of a given cross street. Because of this, the full corridor was included for mapping purposes.

Kittelson & Associates, Inc.

September 30. 2022
Unmet Needs Assessment and Suitability Analysis
Figure 6 Challenges Riding Public Transit (Asked of Transit Riders) What challenges do you face in riding transit in
Beverly Hills?

Page 10 ends

Online Survey Findings

60.00%

50.00%

40.00%

30.00% 20.00%

10.00%

0.00% I l
Public
transportation
does not go
where I need to
go or serve
nearby my home
Transit stops are I do not
too far from my understand how
common origins to use the system
or destinations
Transfers are
confusing, time
consuming, or
costly
Existing transit
services take too
long or do not run
on time
• Strongly Disagree
Destinations
Disagree ■Agree ■Strongly Agree
Determining where people want to go is an important aspect of understanding whether the current transit system is making those connections at all - agnostic of quality of service -or where future service may be most successful. The survey asked every user to list their" (up to) top three destinations when travelling within Beverly Hills". This question received a 61 percent response rate and asked people to answer in comment form rather than selecting from a pre-determined list. All comments were compiled (regardless of which order the destinations were listed) and mapped. In addition, responses from the live exercise conducted during the public workshops were preserved and added to the map. Figure 7 shows a concentration of destinations within and near the Golden Triangle and along Wilshire Blvd. Several travel corridors were highlighted by users:
• North-South Corridors4
0 Rodeo Dr 0 Beverly Dr 0 Canon Dr 0 Rexford Dr 0 Robertson Blvd • E-W Corridors
0 Santa Monica Blvd 0 Olympic Blvd
0 Beverly Blvd
4 In most instances, corridors stated in responses did not indicate corridor segments, such as north or south of a given cross street. Because of this, the full corridor was included for mapping purposes.

Kittelson & Associates. Inc.

September 30, 2022 Page 11
Unmet Needs Assessment and Suitability Analysis Online Survey Findings Frequent location types cited by users included medical facilities such as urgent cares and Cedars-Sinai Medical Center, parks, public schools, commercial/retail areas (e.g. coffee shops and restaurants), civic cenfers (e.g. Post office. library), and religious institutions.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 11 ends

Online Survey Findings
Frequent location types cited by users included medical facilities such as urgent cares and Cedars-Sinai Medical Center, parks, public schools, commercial/retail areas (e.g. coffee shops and restaurants), civic centers (e.g. Post office, library). and religious institutions.

Kittelson & Associates, Inc.

September 30. 2022
Unmet Needs Assessment and Suitability Analysis

Page 12 ends

Online Survey Findings
Figure 7 Top Destinations Within Beverly Hills
Legend
0 0.25 0.5
• Key Destinations
Key Corridors
— Key Areas
Beverly Hills City Omits
Desired Destinations/Corridors
Beverly Hills, CA
These destinations are sourced from an online survey and pubWc workshops (Summer 2022) in which users responded to the question What are your top destinations when traveling within Beverly Hills?” Some destinations 1< K ITTELSON )st outside the City boundary are included to acknowledge the ‘grey zone’ far nearby inter-community connections. . & ASSOCIATES *‘•flh
-
I
Sources: Ei(HERE. Gatmin, USGS. Intel
Ja_pan, METI, Esri China (Hong Kongi, Eon
OenStreetMap contributors, and Ih&GIS I
1 Miles
Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 12 ends

Online Survey Findings
Figure 7 Top Destinations Within Beverly Hills
t r z
u
5 i
E
5 %
z
-
w 4ms
w tstst
Waning Ave
Oakwood Ave
Oueret A%
e»a."?«a o,
z Rosewood Ave
l
?
5 3
0 %
• ' onownrqf west
g Hollywood '
d" .. 0 et
i n a
€ 0 6
U 2
i 3 r
3 E °
•
z
j" Asaro»w· o, 6
-=---r•
•tBwerty 81t,d
dei Dr
wud st
tigz' " e»ram 'i. 5 ; • ''ti'r ;--·-:,·l + [} ·El I[Jo soi T lit e ». g •••!
'1i
• Olym;c Bt, •1
77, !
oie8rad i; B
"% Ateotst i "
2 g8 Pe%
urces. Esri HERE, Garmin, USGS, lnle"'l!'p, l REMENT P, NRCan, Esr Japan, ME TI, Est China (Hong Koni). g Esri {orea{Esri,(Taland), NGCC,(c) OpenStreetMap contributors, and the GIS User Cl munlit E % %, •
% :; • � • s, i % i
. o q
'oeo or
Bel AIr
Pama
Ope .pt«
Desired Destinations/Corridors
Beverly HIiis, CA
Source: Kittelson ond Associates. Inc 2022
Legend
• Key Destinations
- Key Corridors - Key Areas & every us ciy urits
0 0 25 05
I I
1 Miles I 0
Ihese destinations are sourced from an online survey and public workshops (Summer 2022) in which users responded to the question "What are your top destinations when traveling within Beverly Hilt?" Some destinations just outside the City boundary are included to acknowledge the "grey zone" for nearby inter-community connections I< KITTELSON & ASSOCIATES Kittelson & Associates, Inc.

September 30. 2022 Page 13
Unmet Needs Assessment and Suitability Analysis Online Survey Findings Limitations
It is prudent to note the factors which may have shaped the survey response pool. While outreach occurred both online, in person, and through traditional media outlets, the survey itself was distributedexclusively online and in English. Access to the internet, language barriers, and lack of discretionary time to spend responding to a City survey or attend City events — such as the public workshop — may have resultedin under-representation of certain populations or on specific answers such as those that asked for “write-in”responses (e.g. the Destination question). To keep the survey focused on critical community feedback,demographic questions were limited. However, a comparison of age, which was collected, to 2020 American Community Survey (5 Year) data shows that the median age in Beverly Hills is 47 years old whichfalls within the largest responding cohort 35-49 (46 percent). Only 1 percent at people responding indicated they were under 18 (this is less than the 5 percent of the population between the age of 15-17). The Survey was distributed to Beverly Hills Unified School district social media and Parent Teacher Association channels, potentially leading to overrepresentation of guardians who participate in these forums.

Killelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis
Limitations

Page 13 ends

Online Survey Findings
It is prudent to note the factors which may have shaped the survey response pool. While outreach occurred both online, in person, and through traditional media outlets, the survey itself was distributed exclusively online and in English. Access to the internet, language barriers, and lack of discretionary time to spend responding to a City survey or attend City events -- such as the public workshop - may have resulted in under-representation of certain populations or on specific answers such as those that asked for "write-in" responses (e.g. the Destination question). To keep the survey focused on critical community feedback, demographic questions were limited. However, a comparison of age, which was collected, to 2020 American Community Survey (5 Year) data shows that the median age in Beverly Hills is 47 years old which falls within the largest responding cohort 35-49(46 percent). Only l percent of people responding indicated they were under 18 (this is less than the 5 percent of the population between the age of 15-17). The Survey was distributed to Beverly Hills Unified School district social media and Parent Teacher Association channels, potentially leading to overrepresentation of guardians who participate in these forums.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 14 ends

Peer Agency Discussions

IPEER AGENCY DISCUSSIONS
Discussions with Los Angeles Metro (Metro), West Hollywood, and Culver City were organized in order to explore the successes and experiences of different transit services, models, and networks. These peeragencies were chosen based on the following criteria:

Presence of transit services that supplement Metro lines ‘ Similar rider demographics and experiences to those of Beverly Hills Locality to Beverly Hills
The Plan Review, Existing Conditions Analysis, Peer Benchmarking memo identified additional potential peers (Huntington Beach, Laguna Beach, and Santa Monica). However, while the service of these peercities was analyzed, the selected benchmarking conversations focused on peers with experiencesoperating locally to gain additional input on local considerations and coordination with relevant Los Angeles County institutions.

Key takeaways from each peer agency discussion are discussed below.

Los Angeles County Metropolitan Transportation
Authority (Metro)
The project team organized a virtual discussion with Metro on Monday, August 15, 2022. The following sections summarize key topics mentioned throughout the conversation.

EXISTING SERVICE

LOCAL BUS SERVICE
The northern part of Beverly Hills is served primarily by Line 2. The central and southern parts of Beverly Hills are served by Lines 4, 20, 28, 105, 617, and 720. Currently, Lines 4, 20, and 720 carry the majority ofpassengers within Beverly Hills, and are among Metro’s most productive lines in the system. Most of thetransit service provided is primarily along east-west corridors. Only Lines 105 and 617 partially travel alongnorth-south corridors within the City.

Table 2 summarizes the existing Metro lines that currently serve the City of Beverly Hills.Table 2: Existing Metro Service in Beverly Hills 4 Metro Local Line
20 Metro Local Line28 Metro Local Line
105 Metro Local Line
East-West travel via Santa Monica BlvdEast-West travel via Wilshire BlvdEast-West travel via Olympic BlvdNorth-South travel via La Cienega Blvd

9.5 15

7.5 10
2 Metro Local Line East-West travel via Sunset Blvd 7.5 Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis
[PEER AGENCY DISCUSSIONS

Page 14 ends

Peer Agency Discussions
Discussions with Los Angeles Metro (Metro). West Hollywood, and Culver City were organized in order to explore the successes and experiences of different transit services, models, and networks. These peer agencies were chosen based on the following criteria:
■ Presence of transit services that supplement Metro lines ■ Similar rider demographics and experiences to those of Beverly Hills ■ Locality to Beverly Hills The Plan Review, Existing Conditions Analysis, Peer Benchmarking memo identified additional potential peers (Huntington Beach, Laguna Beach, and Santa Monica). However, while the service of these peer cities was analyzed, the selected benchmarking conversations focused on peers with experiences operating locally to gain additional input on local considerations and coordination with relevant Los Angeles County institutions.

Key takeaways from each peer agency discussion are discussed below.

Los Angeles County Metropolitan Transportation
Authority (Metro}
The project team organized a virtual discussion with Metro on Monday, August 15, 2022. The following sections summarize key topics mentioned throughout the conversation.

EXISTING SERVICE

LOCAL BUS SERVICE
The northern part of Beverly Hills is served primarily by Line 2. The central and southern parts of Beverly Hills are served by Lines 4, 20, 28, l 05, 617, and 720. Currently, Lines 4, 20, and 720 carry the majority of passengers within Beverly Hills, and are among Metro's most productive lines in the system. Most of the transit service provided is primarily along east-west corridors. Only Lines l 05 and 617 partially travel along north-south corridors within the City.

Table 2 summarizes the existing Metro lines that currently serve the City of Beverly Hills.

Table 2: Existing Metro Service In Beverly Hills
2 4
20 28
105
Metro Local Line Metro Local Line Metro Local Line Metro Local Line Metro Local Line
East-West travel via Sunset Blvd East-West travel via Santa Monica Blvd East-West travel via Wilshire Blvd East-West travel via Olympic Blvd North-South travel via La Cienega Blvd

7.5 9.5
15 7.5
10 Kittelson & Associates, Inc.

September 30, 2022 Page 15
Unmet Needs Assessment and Suitability Analysis Peer Agency Discussions 617 Metro Local Line East-West travel via Burton Way 60 North-South travel via Robertson Blvd and Beverly Dr
720 Metro Rapid Line East-West travel via Wilshire 15
Source: Metro, 2022
NEXIGEN BUS PLANIn 2018, Metro launched an effort to reimagine the bus system to better meet the needs of current and future riders through goals such as (1) doubling the number of frequent Metro bus lines and (2) providing more than 80 percent of current bus riders with 10 minute or better frequency. The NextGen Bus Plan was developed through consideration of technical data and public outreach that included over 400 meetings, events, and workshops over two years. It was approved by the Metro Board of Directors in October 2020.

Research supporting the plan showed a trend toward more people using Metro for shorter trips than longer trips. The restructuring plan sought to meet these needs with higher service frequency and a simplified network focused on local service with rebalanced bus stop spacing targeting ‘/4 mile between stops, and subsequently transitioning away from a comprehensive, longer-distance Rapid bus network. The NextGen Bus Plan service changes were developed to improve the speed, reliability, and accessibility of the transit system. These service changes are summarized in Table 3.Challenges related to COVID-19, including on operator shortage, have currently disrupted Metros ability tooperate full service, and as a result, service frequencies in Beverly Hills and across the Metro network arelower than envisioned for full implementation of the NextOen plan.

Kiltelsan & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 15 ends

Peer Agency Discussions
617 720
Metro Local Line Metro Rapid Line
East-West travel via Burton Way North-South travel via Robertson Blvd and Beverly Dr East-West travel via Wilshire 60 15
Source: Metro, 2022

NEXTGEN BUS PLAN
In 2018, Metro launched an effort to reimagine the bus system to better meet the needs of current and future riders through goals such as ( 1 ) doubling the number of frequent Metro bus lines and (2) providing more than 80 percent of current bus riders with 10 minute or better frequency. The NextGen Bus Plan was developed through consideration of technical data and public outreach that included over 400 meetings, events, and workshops over two years. It was approved by the Metro Board of Directors in October 2020.

Research supporting the plan showed a trend toward more people using Metro for shorter trips than longer trips. The restructuring plan sought to meet these needs with higher service frequency and a simplified network focused on local service with rebalanced bus stop spacing targeting ¼ mile between stops, and subsequently transitioning away from a comprehensive, longer-distance Rapid bus network. The NextGen Bus Plan service changes were developed to improve the speed, reliability, and accessibility of the transit system. These service changes are summarized in Table 3. Challenges related to COVID-19, including an operator shortage, have currently disrupted Metro's ability to operate full service, and as a result, service frequencies in Beverly Hills and across the Metro network are lower than envisioned for full implementation of the NextGen plan. Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 16 ends

Peer Agency Discussions
Table 3: NextGen Service Changes Impacting Beverly Hills Metro 4 Downtown LA — Santa Monica
via Santa Monica Blvd
Metro 20 Downtown LA —
Westwood/Santa Monica via
Wilshire Blvd
More Frequency, Simpler network
Merges Lines 4 & 704 on Santa Monica Blvd
More Frequency, Simpler network
Merges Lines 20 & 720 between downtown
Santa Monica and Downtown LA via
Wilshire
Metro 28 Century City — Downtown LA
via Olympic Blvd
Metro 105 West Hollywood — Vernon via
La Cienega Blvd/ Vernon Ave
Metro 617 Beverly Dr — Burton Way —
Robertson Blvd Shuttle
Metro 720 Santa Monica — Downtown LA
via Wilshire Blvd
Source: Metro, 2022
More Frequency, Simpler network
New high frequency line. Merges 28 & 728.

More Frequency, Simpler network
New high frequency line. Merges 105 & 705.

New Line
Simplifies network with a higher frequency.

E Line Culver City station to Cedars-Sinai
Medical Center/Beverly Center via
Robertson Blvd, west via Burton Wy and
South on Beverly Dr. to Pica Blvd (replacing
Lines 14 &16 & 17 on those streets)
More Frequency, Simpler network
New High Freq line 20 merging 20 & 720.

Peak service only.
18 27 36 7.5 10 15
18 20 45 10 10 15-30
30 60 60 45 45 45
8 11 16 10
Metro 2 Downtown LA — Westwood via More Frequency, Simpler network 11 15 27 7.5 10 15
Sunset Blvd Merges Lines 2, 302, and 200
14 15 21 6 7.5 10
15 12 28 5 5 7.5
Kittelson & Associates, Inc.
00 C"') o co 00
c C)
'z o U
U >-
w
> 0
i:
o
uo) o u) uo) co u) r I t )
O
C u
.
.9 . o uo) o o uo) 0 8 . r' t 0
c u
>-
o
9 2
.o to 0 . o ) o uo) o 0 . t r' qt

0. Q) Q)
<
.

I co so uo) o o cu cN cu 0o <t O uo) uo) cu " o o cu cv o z z
9 c
o
z
.,, 0
·a %
%
£
u
)
0 9 <Ii
3 0
g
cy o 0y cw
t cu o
~ « 2> O%•
s
co
t
o c
€
c' u)
0 5
O >
I
3 #
s2
5£ U
co
co
2 5% e£
$
O
8 co 0¥
0 u)
e LI)
¢ o
z ¾
O
-
d (I) Q5 E .
=
g
0 > z 0 0 c
:I (I) o D d o
cg
9c o 0
zr
z
(I)
3 o 9
5 <
c c 0 0 £ £ (I) (I)
> 2>
]
g 9 8 %
38 = 0 o ¢
r @ t0
1 o
cu 00
5%
1 5
2 I
2o
a
2€ 52
zO
0 0'
cu
o
o 0
e
O 0
5 o
I E
< U -'g o
$8%
9gs
5=%
>
.-
>
o
5 0
e
O 0
g
- > c a go
'2 <( 5
'5
Oi e 0
t:
0 '
0 0 - 2 0
>- • :!::: U 4 c c d 0
<
0 cc
0 5
0 z
o £ 0
>
% z
0 ><
e
0 c "' 0 z 0 0
i:
0 .c
j!
U
0 "' u
E %
0 c
(
c
0 c % u
5 d
i z
0 <II
£
V)
0 E
( <II
u •
o C 0 0 u
£
0 0 « • c 0
ct
d >
�
>-
5 .2
E
Q)
a
0 c
0 V) 5
9 o 2
<
c
6 3
u
av : oyo cN
2 c O
0 % $ Qz
Q)
E
Q)
b£
£
¢D
September 30, 2022 Page 17
Unmet Needs Assessment and Suitability Analysis Peer Agency Discussions METRO MICROIn 2020, Metro launched a three year on-demand rideshare service pilot project called Metro Micro. They offer trips within their five service zones across Los Angeles County. The new service is designed to serveshorter local trips and uses small vehicles with seating for up to 10 passengers. Metro Micro as a concept was envisioned to form part of a family of Metro services, and service area pilot zones were designed to be incorporated into the Metro network in conjunction with the NextGen Bus Plan. The service is designed tobe a fast, safe, and convenient option for quick trips around town.Within the context of the Westside, the pilot has so far proven reasonably successful among college students in the Westwood area. Digital familiarity is viewed by Metro staff as key for microtransit and thus adoption has not been as successful among older residents. However, Metro has experienced that oncepassengers become familiar with how to request and use the service, they enjoy the service.Metro Micro implementation also has not had a perceivable negative impact on fixed-route bus ridership.

The following data provides a high-level summary of current pilot performance to date:
ii Trip length of 2-3 miles on averages 3 passengers per hour on average Operational cost of $30 per ride, which is higher than the average fixed route operational costs60 percent of the rides are shared with other community members High trip-reject rate
Consistent growth that may be copped by service availability

RIDERSHIP IMPACTS FROM THE OPENING OF THE E (EXPO) LINE Given the similarity of intent and geographic location of the D (Purple) Line, its opening may trigger similarridership trend impacts as the opening of the fully-completed E (Expo) Line. With the full opening of the E Line, parallel east-west bus lines decreased in ridership by about 25 percent. There was some increase along the north-south lines connecting to the E Line, but the bulk of the increase in ridership was seen bythe municipal agencies (Culver City and Santa Monica) responsible for the majority of connecting busservice in the new portion of the service area.

LIMITATIONS OF AND OPPORTUNITIES FOR SERVICE ENHANCEMENTS There is a prime opportunity for both Metro and Beverly Hills to work together to improve local and regional transit network connectivity around future D Line stations. Metro staff interviewed feel there can be a beneficial role for additional municipal service in these areas to meet demand. As long as these services do not conflict, Metro is supportive of the City’s effort to improve transit services. Metro staff also identifiedopportunities to connect the residents of Beverly Hills by providing better north-south transit service connections.With the NextGen Bus Plan, Line 617 was planned to receive increased service frequency of up to 15 minutes; however, this target has not been met due to Metro’s ongoing operator shortage. Metro staff also identified addition Line 617 improvement opportunities, namely a reroute onto Canon Drive to provide a more direct connection to the future Purple Line station at Wilshire and Rodeo.Metro staff also shared a concern that some riders making longer trips may find the changes introduced with the NextGen bus plan to inconvenience with multiple bus transfers. The completion of the D Line extension to Westwood and the Veterans Administration hospital will hopefully reduce this burden.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis METRO MICRO

Page 17 ends

Peer Agency Discussions
In 2020, Metro launched a three year on-demand rideshare service pilot project called Metro Micro. They offer trips within their five service zones across Los Angeles County. The new service is designed to serve shorter local trips and uses small vehicles with seating for up to 10 passengers. Metro Micro as a concept was envisioned to form part of a family of Metro services, and service area pilot zones were designed to be incorporated into the Metro network in conjunction with the NextGen Bus Plan. The service is designed to be a fast, safe, and convenient option for quick trips around town.

Within the context of the Westside, the pilot has so far proven reasonably successful among college students in the Westwood area. Digital familiarity is viewed by Metro staff as key for microtransit and thus adoption has not been as successful among older residents. However, Metro has experienced that once passengers become familiar with how to request and use the service, they enjoy the service. Metro Micro implementation also has not had a perceivable negative impact on fixed-route bus ridership.

The following data provides a high-level summary of current pilot performance to date:
■ Trip length of 2-3 miles on average ■ 3 passengers per hour on average ■ Operational cost of $30 per ride, which is higher than the average fixed route operational costs ■ 60 percent of the rides are shared with other community members ■ High trip-reject rate ■ Consistent growth that may be capped by service availability

RIDERSHIP IMPACTS FROM THE OPENING OF THE E (EXPO) LINE Given the similarity of intent and geographic location of the D (Purple) Line, its opening may trigger similar ridership trend impacts as the opening of the fully-completed E (Expo) Line. With the full opening of the E Line, parallel east-west bus lines decreased in ridership by about 25 percent. There was some increase along the north-south lines connecting to the E Line, but the bulk of the increase in ridership was seen by the municipal agencies (Culver City and Santa Monica) responsible for the majority of connecting bus service in the new portion of the service area.

LIMITATIONS OF AND OPPORTUNITIES FOR SERVICE ENHANCEMENTS There is a prime opportunity for both Metro and Beverly Hills to work together to improve local and regional transit network connectivity around future D Line stations. Metro staff interviewed feel there can be a beneficial role for additional municipal service in these areas to meet demand. As long as these services do not conflict, Metro is supportive of the City's effort to improve transit services. Metro staff also identified opportunities to connect the residents of Beverly Hills by providing better north-south transit service connections.

With the NextGen Bus Plan, Line 6 17 was planned to receive increased service frequency of up to 15 minutes; however, this target has not been met due to Metro's ongoing operator shortage. Metro staff also identified addition Line 6 17 improvement opportunities, namely a reroute onto Canon Drive to provide a more direct connection to the future Purple Line station at Wilshire and Rodeo.

Metro staff also shared a concern that some riders making longer trips may find the changes introduced with the NextGen bus plan to inconvenience with multiple bus transfers. The completion of the D Line extension to Westwood and the Veterans Administration hospital will hopefully reduce this burden.

Kittelson & Associates, Inc.

September 30, 2022 Page 18
Unmet Needs Assessment and Suitability Analysis Peer Agency Discussions West Hollywood
The project team organized a virtual discussion with West Hollywood’s Social Services division on Thursday, August 11, 2022. The following sections summarize key topics discussed throughout the conversation.

EXISTING SERVICE
The City of West Hollywood is served by fixed route and on-demand services operated by LA Metro and the City. It also offers specialized and subsidized services to seniors (age 62+) and people with disabilities. Table 4 summarizes the existing services West Hollywood currently offers.Table 4: Existing West Hollywood Transit Services CityLine Local Free daytime shuttle (M-Sat 9AM-5:3OPM) that runs every 30 minutes and serves stops throughout the City of West Hollywood. The shuttle serves all purpose intra-community trips.

CityLine Commuter Free rush hour and Saturday evening service connecting the City of West Hollywood and the Hollywood/Highland Metro B (Red) Line Station. The shuttle runs 15-minute frequency on weekdays 7AM-9AM and 5PM-8PM and Saturdays 5PM-8PM.

Pickup Launched in August 2013 as a free entertainment shuttle that ran Fri-Sat (8PM3AM) along Santa Monica Blvd between Fairfax Ave and Doheny Drive. It operates Friday through Saturday (8PM-3AM) and on Sunday (2PM-1OPM) with a frequency of 15 minutes between Robertson Blvd and La Brea Avenue.

Dial-A-Ride Free shared-ride transportation service. Trips are scheduled by appointment only and can be scheduled up to a week in advance. Regular shuttles provide trips for grocery shopping, to UCLA Medical Center, and VA West Los Angeles. Serves anywhere within West Hollywood, UCLA, VA, Kaiser (Cadillac and Sunset) and West Hollywood social service agencies. Only available for West Hollywood residents aged 62 or older and community members with disabilities at any age. All vehicles are ADA accessible. Curb-to-curb and Door-to-door options are available.

On-Call Transportation Registration required service that is available on short notice, without (Lyft/Uber) advanced reservations. They are operating 24/7 and advertise to pick up riders within 15 minutes. Serves anywhere within the City of West Hollywoodand up to a 10 mile radius from the border of the City of West Hollywood boundaries. Only available for West Hollywood residents aged 62 or older and community members with disabilities at any age. ADA accessible vehicles are available.

Source: West Hollywood, 2022
RIDERSHIP TRENDS ACROSS SERVICESDuring the pandemic, ridership across all services decreased sharply. However, ridership is presently trending slightly upward. Prior to the pandemic, the CityLine Commuter route was highly popular,representing 60 percent of West Hollywood municipal transit ridership. CityLine Commuter route ridership is Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis
West Hollywood

Page 18 ends

Peer Agency Discussions
The project team organized a virtual discussion with West Hollywood's Social Services division on Thursday, August 11, 2022. The following sections summarize key topics discussed throughout the conversation.

EXISTING SERVICE
The City of West Hollywood is served by fixed route and on-demand services operated by LA Metro and the City. It also offers specialized and subsidized services to seniors (age 62+) and people with disabilities. Table 4 summarizes the existing services West Hollywood currently offers.

Table 4: Existing West Hollywood Transit Services
Cityline Local CityLine Commuter
Free daytime shuttle (M-Sat 9AM-5:30PM) that runs every 30 minutes and serves stops throughout the City of West Hollywood. The shuttle serves all purpose intra-community trips.

Free rush hour and Saturday evening service connecting the City of West Hollywood and the Hollywood/Highland Metro B (Red) Line Station. The shuttle runs 15-minute frequency on weekdays 7AM-9AM and 5PM-8PM and Saturdays 5PM-8PM.

Launched in August 2013 as a free entertainment shuttle that ran Fri-Sat (8PM3AM) along Santa Monica Blvd between Fairfax Ave and Doheny Drive. It operates Friday through Saturday (8PM-3AM) and on Sunday (2PM-10PM) with a frequency of 15 minutes between Robertson Blvd and La Brea Avenue.

Free shared-ride transportation service. Trips are scheduled by appointment only and can be scheduled up to a week in advance. Regular shuttles provide trips for grocery shopping, to UCLA Medical Center, and VA West Los Angeles. Serves anywhere within West Hollywood, UCLA, VA, Kaiser (Cadillac and Sunset) and West Hollywood social service agencies. Only available tor West Hollywood residents aged 62 or older and community members with disabilities at any age. All vehicles are ADA accessible. Curb-to-curb and Door-to-door options are available. Registration required service that is available on short notice, without advanced reservations. They are operating 24/7 and advertise to pick up riders within 15 minutes. Serves anywhere within the City of West Hollywood and up to a 10 mile radius from the border of the City of West Hollywood boundaries. Only available tor West Hollywood residents aged 62 or older and community members with disabilities at any age. ADA accessible vehicles are available. Source: West Hollywood, 2022

RIDERSHIP TRENDS ACROSS SERVICES
During the pandemic, ridership across all services decreased sharply. However, ridership is presently trending slightly upward. Prior to the pandemic, the CityLine Commuter route was highly popular, representing 60 percent of West Hollywood municipal transit ridership. Cityline Commuter route ridership is Kittelson & Associates, Inc. PickUp Dial-A-Ride On-Call Transportation (Lyft/Uber) September 30, 2022 Page 19
Unmet Needs Assessment and Suitability Analysis Peer Agency Discussions still well below pre-pandemic ridership, which City staff attribute to the shift toward working from home.CityLine Local ridership volume is also still below pre-pandemic ridership; however, it is recovering fasterthan CityLine Commuter given changing worksite dynamics among the conventional daytime commuterpopulation.

Anecdotal evidence from City staff in the absence of surveys conducted since the onset of the COVID-1 9 pandemic suggests that each service has unique demographics, which had in the past been supported by survey data. CityLine Local serves an older population, with many city seniors using the service to access community resources and grocery stores, while CityLine Commuter service users are demographically more similar to the city population as a whole.

The PickUp service is currently performing higher than pre-pandemic with approximately 2,000 trips perweekend compared to 1,700 trips. Based on 90 percent of participants of a 2019 survey, most riders are local residents, under the age of 40, and male5. On Sunday, there are more older participants.

UPCOMING OPPORTUNITIES
As ridership increases, the City of West Hollywood will continue to find ways to improve local and regionalconnectivity. With the opening of the D Line extension, the City of West Hollywood would like toaccommodate future demand by providing a second commuter route.

Recently, the council approved the proposal for a microtransit pilot project. The intent of this project is to transition away from Dial-A-Ride and provide a citywide, general public microtransit service with a priorityfor city seniors and residents with disabilities served by the current Dial-A-Ride service. While trips will still be offered to qualifying populations for free, West Hollywood plans to charge non-qualifying riders a fare.

Since the West Hollywood shares a border with Beverly Hills, City staff agree there is a great opportunity for collaboration to improve connections between the two cities, such as along Doheny Drive.

Culver City
The project team organized a virtual discussion with Culver City’s Transportation department on Wednesday, September 7, 2022. The following sections summarize key topics mentioned throughout theconversation.

EXISTING SERVICE
The City of Culver City provides several varieties of transit services to help residents, workers, and visitors travel around the city. Table 5 summarizes the existing Culver City transit service classifications.Table 5: Existing Culver City Transit Services ?2[
CityBus CityBus operated fixed-route service provides connections throughout Culver City and communities in Los Angles including Century City, Marina del Ray, https://www.weho.org/services/social-services/community-study Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 19 ends

Peer Agency Discussions
still well below pre-pandemic ridership, which City staff attribute to the shift toward working from home.

CityLine Local ridership volume is also still below pre-pandemic ridership; however, it is recovering faster than Cityline Commuter given changing worksite dynamics among the conventional daytime commuter population.

Anecdotal evidence from City staff in the absence of surveys conducted since the onset of the COVID-19 pandemic suggests that each service has unique demographics, which had in the past been supported by survey data. Cityline Local serves an older population, with many city seniors using the service to access community resources and grocery stores, while City Line Commuter service users are demographically more similar to the city population as a whole.

The PickUp service is currently performing higher than pre-pandemic with approximately 2,000 trips per weekend compared to 1,700 trips. Based on 90 percent of participants of a 2019 survey, most riders are local residents. under the age of 40, and male5• On Sunday, there are more older participants.

UPCOMING OPPORTUNITIES
As ridership increases, the City of West Hollywood will continue to find ways to improve local and regional connectivity. With the opening of the D Line extension. the City of West Hollywood would like to accommodate future demand by providing a second commuter route.

Recently, the council approved the proposal for a microtransit pilot project. The intent of this project is to transition away from Dial-A-Ride and provide a citywide, general public microtransit service with a priority for city seniors and residents with disabilities served by the current Dial-A-Ride service. While trips will still be offered to qualifying populations for free, West Hollywood plans to charge non-qualifying riders a fare. Since the West Hollywood shares a border with Beverly Hills, City staff agree there is a great opportunity for collaboration to improve connections between the two cities. such as along Doheny Drive.

Culver City
The project team organized a virtual discussion with Culver City's Transportation department on Wednesday, September 7, 2022. The following sections summarize key topics mentioned throughout the conversation.

EXISTING SERVICE
The City of Culver City provides several varieties of transit services to help residents. workers. and visitors travel around the city. Table 5 summarizes the existing Culver City transit service classifications. Table 5: Existing Culver City Transit Services ]
CityBus CityBus operated fixed-route service provides connections throughout Culver City and communities in Los Angles including Century City, Marina del Ray, 5 https://www.weho.org/services/social-services/community-study Kittelson & Associates, Inc.

September 30, 2022 Page 20
Unmet Needs Assessment and Suitability Analysis Peer Agency Discussions and Westwood. The services interface with major destinations from UCLA toMetro C (Green) and E (Expo) Lines.

CityBus Local Circulator Pilot circulator routes to provide additional frequency to existing fixed-route alignments and support recent investments in dedicated transit infrastructure on key city arterial streets.

Route 1 Cl Culver City Downtown Circulator offers free rides between downtown and the Arts District via the Metro F Line. The circulator uses anelectric, low-floor minibus and runs every 10 minutes at peak hour and 15minutes in the off-peak. Routes SC1 and 5C2 are weekday circulators thatoperate when school is in session, serving Culver City Middle School and High School as well as Downtown and La Cienega Blvd. 5C1 connects the Arts District and Clarksdale to Washington Blvd while 5C2 connects Overland Ave and Fox Hills to Washington Blvd.

Circuit Free electric shuttle service (microtransit) that connects destinations between downtown Culver City, the Art District, and Hayden Tract. It operates weekdays 8AM-5PM and on weekends 1OAM-8PM.

Source: Culver City, 2022

LESSONS LEARNED FROM E (EXPO) LINE DEVELOPMENT
In 2005, Culver City was starting to prepare for the opening of Metro’s E (Expo) Line. The Culver City station was proposed as an intermodal transit facility with an off-street transit center in Metro’s right-of-way. During its design, the culture of Culver City was more car-oriented, thus concerns primarily involved traffic impactsof buses coming in and out of Metro’s right-of-way. Negotiations with Metro resulted in an above-grade railstation and improved integration of the bus transit center to improve intermodal connections.After the Culver City station opened, the city experienced significant development around the station area, with the City working with developers to incorporate transit-oriented principles into newdevelopments and support improvements to streetscape planning. However, even with enhancements tobus transit connectivity, station access by car still experienced overwhelming demand, and the 300 parking spaces that were provided were insufficient to meet the demand for parking at the station. This experience led City staff to advance the Move Culver City project to improve transit connectivity throughout CulverCity’s urban core and station area and improve the bus transit experience to encourage more transit use.MOVE CULVER CITY INITIATIVEMove Culver City is implementing the vision set forth in the City’s TOD Visioning Plan (adopted in 2017) &the Bicycle and Pedestrian Action Plan to implement holistic transportation options forpedestrians, bicyclists, and transit riders. To achieve this, the Culver City Transportation Department islooking to implement three Tactical Mobility Lane Pilot Projects through the quick-build process in threedifferent phases:
e Phase 1: Tactical Mobility Lane on Washington Boulevard Phase 2: Tactical Mobility Lane on Sepulveda BoulevardPhase 3: Tactical Mobility Lane on Jefferson Boulevard Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 20 ends

Peer Agency Discussions
and Westwood. The services interface with major destinations from UCLA to Metro C (Green) and E (Expo) Lines.

CityBus Local Circulator Pilot circulator routes to provide additional frequency to existing fixed-route alignments and support recent investments in dedicated transit infrastructure on key city arterial streets.

Circuit
Source: Culver City, 2022
Route 1 Cl Culver City Downtown Circulator offers free rides between downtown and the Arts District via the Metro E Line. The circulator uses an electric, low-floor minibus and runs every l O minutes at peak hour and 15 minutes in the off-peak. Routes 5C1 and 5C2 are weekday circulators that operate when school is in session, serving Culver City Middle School and High School as well as Downtown and La Cienega Blvd. 5C l connects the Arts District and Clarksdale to Washington Blvd while 5C2 connects Overland Ave and Fox Hills to Washington Blvd.

Free electric shuttle service (microtransit) that connects destinations between downtown Culver City, the Art District, and Hayden Tract. It operates weekdays 8AM-5PM and on weekends l0AM-8PM. LESSONS LEARNED FROM E (EXPO) LINE DEVELOPMENT In 2005, Culver City was starting to prepare for the opening of Metro's E (Expo) Line. The Culver City station was proposed as an intermodal transit facility with an off-street transit center in Metro's right-of-way. During its design, the culture of Culver City was more car-oriented, thus concerns primarily involved traffic impacts of buses coming in and out of Metro's right-of-way. Negotiations with Metro resulted in an above-grade rail station and improved integration of the bus transit center to improve intermodal connections. After the Culver City station opened, the city experienced significant development around the station area, with the City working with developers to incorporate transit-oriented principles into new developments and support improvements to streetscape planning. However, even with enhancements to bus transit connectivity, station access by car still experienced overwhelming demand, and the 300 parking spaces that were provided were insufficient to meet the demand for parking at the station. This experience led City staff to advance the Move Culver City project to improve transit connectivity throughout Culver City's urban core and station area and improve the bus transit experience to encourage more transit use. MOVE CULVER CITY INITIATIVE Move Culver City is implementing the vision set forth in the City's TOD Visioning Plan (adopted in 2017) & the Bicycle and Pedestrian Action Plan to implement holistic transportation options for pedestrians, bicyclists, and transit riders. To achieve this, the Culver City Transportation Department is looking to implement three Tactical Mobility Lane Pilot Projects through the quick-build process in three different phases:
■ Phase l : Tactical Mobility Lane on Washington Boulevard ■ Phase 2: Tactical Mobility Lane on Sepulveda Boulevard ■ Phase 3: Tactical Mobility Lane on Jefferson Boulevard Kittelson & Associates, Inc.

September30, 2022 Page 21
Unmet Needs Assessment and Suitability Analysis Peer Agency Discussions These pilot projects will serve as the opportunity for Culver City to learn how the permanent infrastructure improvement would work and demonstrate the benefits of such infrastructure to maximize the use of theroadway.CIRCULATOR INTEGRATION In November 2021, Culver City introduced an electric, low-floor minibus circulator scheduled to run every 10 minutes at peak times and every 15 minutes off-peak. Until January 2023, the circulator will remain free and open to the public. The intent behind the addition of the circulator to the Move Culver City pilotproject, as well as the use of converted electric passenger vans instead of conventional transit buses, was to help make service more accessible and convenient for residents and reduce the stigma of riding transit.

During the school year, additional circulator routes that serve Culver City Middle School and High School are now offered after organizing by the school district and parents. Unlike the initial 1C1 circulator route,the school routes are not free to the public, but in practice are free for students through a subsidized transitpass program developed in coordination with the school district.

Ridership is currently lower than anticipated due to a variety of challenges, including some technology challenges with the vehicles used for service, operator shortages, and overlapping services with Metro’s Line 1. Since the 1C1 service area expanded in June 2022, ridership has grown slightly. Additional marketing and branding is planned to better publicize the circulator’s availability and benefits to the community.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 21 ends

Peer Agency Discussions
These pilot projects will serve as the opportunity for Culver City to learn how the permanent infrastructure improvement would work and demonstrate the benefits of such infrastructure to maximize the use of the roadway. CIRCULATOR INTEGRATION In November 2021, Culver City introduced an electric, low-floor minibus circulator scheduled to run every l 0 minutes at peak times and every I5 minutes off-peak. Until January 2023, the circulator will remain free and open to the public. The intent behind the addition of the circulator to the Move Culver City pilot project, as well as the use of converted electric passenger vans instead of conventional transit buses, was to help make service more accessible and convenient for residents and reduce the stigma of riding transit.

During the school year, additional circulator routes that serve Culver City Middle School and High School are now offered after organizing by the school district and parents. Unlike the initial l Cl circulator route, the school routes are not free to the public, but in practice are free for students through a subsidized transit pass program developed in coordination with the school district.

Ridership is currently lower than anticipated due to a variety of challenges, including some technology challenges with the vehicles used for service, operator shortages, and overlapping services with Metro's Line l. Since the l Cl service area expanded in June 2022, ridership has grown slightly. Additional marketing and branding is planned to better publicize the circulator's availability and benefits to the community.

Kittelson & Associates, Inc.

September 30, 2022 Page 22
Unmet Needs Assessment and Suitability Analysis Prospective Service Design and Mode Suitability Analysis

PROSPECTIVE SERVICE DESIGN AND MODE
SUITABILITY ANALYSIS jBeverly Hills is well-suited for a variety of transit options, with a compact footprint, a strong grid pattern, and a mix of land uses that provides consistent all-day sources of travel demand. Two complementary optionsare most well-suited for consideration in the form of an early pilot. Advancement of either of these twooptions — or a combination of both — will help to better inform actual transit needs of the community through real-world practical experience, and can be further adjusted or serve as a basis for an informedtransition to a different service configuration.The two options proposed for further consideration under this study are City-controlled fixed-route transit and City-controlled microtransit. Fixed route transit operates like conventional public transportation as seen within Beverly Hills today provided by Metro, operating along defined routes on defined schedules, serving defined stops. Microtransit is an emerging technology option that offers on-demand routing between more widely spaced origins and destinations using smaller transit vehicles.

It is recommended that any service be first offered in the form of a limited pilot period under theadministration of the City of Beverly Hills. This will allow the City to explore alternatives and respond morequickly to needs that may arise.

Prospective Service Design
Based on the existing service provided within Beverly Hills, the future regional connections provided by the upcoming D Line extension, current and future demographics and land use patterns, as well as communityinput from public outreach and community preference surveys, a combination of one or more fixed-routecirculator routes and a microtransit service area would provide the desired service throughout Beverly Hills,appropriate connections to maximize the effectiveness of the regional transit network, and provide the most effective means of reducing vehicle miles traveled (VMT) throughout the city. Conceptual details ofeach component and their respective roles in a community transit network are explored below.

Fixed-Route Circulator
The fixed-route service model uses multi-passenger vehicles operating along defined routes on definedschedules to serve passengers at defined stops without reservations. While routes can be of any length, what is commonly referred to as a “circulator” model often operates shorter routes targeted to intra community local circulation needs, and often uses smaller vehicles. The fixed-route circulator model isrecommended to be the primary service incorporated into a Beverly Hills transit pilot due to the geographyserved, anticipated passenger volumes, existing complementary regional transit connections, and the highest relative cost efficiency.

Fixed-route service allows for trips to be aggregated into a more efficient footprint, offering potential for reductions in vehicle miles traveled (VMT), especially if paired with other priority measures that can improvetravel times to match or fall below single-occupancy vehicle travel times such as dedicated transit lanes,shared bus/bike lanes, or emerging options such as municipal high-occupancy vehicle (HOV) lanes.

Public input received over the course of this study indicated that interest was strong throughout the community in a fast connection into the upcoming D Line stations being constructed along Wilshire Kittelson & Associates, Inc.

I
September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 22 ends

Prospective Service Design and Mode Suitability Analysis !PROSPECTIVE SERVICE DESIGN AND MODE SUITABILITY ANALYSIS Beverly Hills is well-suited for a variety of transit options. with a compact footprint. a strong grid pattern. and a mix of land uses that provides consistent all-day sources of travel demand. Two complementary options are most well-suited for consideration in the form of an early pilot. Advancement of either of these two options - or a combination of both -- will help to better inform actual transit needs of the community through real-world practical experience. and can be further adjusted or serve as a basis for an informed transition to a different service configuration. The two options proposed for further consideration under this study are City-controlled fixed-route transit and City-controlled microtransit. Fixed route transit operates like conventional public transportation as seen within Beverly Hills today provided by Metro, operating along defined routes on defined schedules, serving defined stops. Microtransit is an emerging technology option that offers on-demand routing between more widely spaced origins and destinations using smaller transit vehicles.

It is recommended that any service be first offered in the form of a limited pilot period under the administration of the City of Beverly Hills. This will allow the City to explore alternatives and respond more quickly to needs that may arise.

Prospective Service Design
Based on the existing service provided within Beverly Hills, the future regional connections provided by the upcoming D Line extension, current and future demographics and land use patterns, as well as community input from public outreach and community preference surveys, a combination of one or more fixed-route circulator routes and a microtransit service area would provide the desired service throughout Beverly Hills. appropriate connections to maximize the effectiveness of the regional transit network, and provide the most effective means of reducing vehicle miles traveled (VMT) throughout the city. Conceptual details of each component and their respective roles in a community transit network are explored below.

Fixed-Route Circulator
The fixed-route service model uses multi-passenger vehicles operating along defined routes on defined schedules to serve passengers at defined stops without reservations. While routes can be of any length, what is commonly referred to as a "circulator" model often operates shorter routes targeted to intracommunity local circulation needs, and often uses smaller vehicles. The fixed-route circulator model is recommended to be the primary service incorporated into a Beverly Hills transit pilot due to the geography served, anticipated passenger volumes, existing complementary regional transit connections, and the highest relative cost efficiency. Fixed-route service allows for trips to be aggregated into a more efficient footprint, offering potential for reductions in vehicle miles traveled (VMT}, especially if paired with other priority measures that can improve travel times to match or fall below single-occupancy vehicle travel times such as dedicated transit lanes, shared bus/bike lanes, or emerging options such as municipal high-occupancy vehicle (HOV) lanes. Public input received over the course of this study indicated that interest was strong throughout the community in a fast connection into the upcoming D Line stations being constructed along Wilshire Kittelson & Associates, Inc.

September 30, 2022 Page 23
Unmet Needs Assessment and Suitability Analysis Prospective Service Design and Mode Suitability Analysis Boulevard at La Cienega Boulevard and Rodeo Drive, which can be best achieved with a dedicated linear bus route focusing on a limited number of arterial streets. The greatest transit circulation need withinthe community is for north-south connectivity, as identified through community input and LA Metro peerdiscussions, since the regional east-west connectivity continues to be strong with the upcoming D Line and surface transportation options along Sunset, Santa Monica, Wilshire, and Olympic Boulevards.

Fixed-route transit propensity is greatest from Santa Monica Boulevard to the south of the city, as the intensity of commercial activity and greater relative density provides the concentration of residents andcommercial points of interest that offers the greatest potential ridership base. The residential land use patterns north of Santa Monica Boulevard are traditionally associated with lower all-day transit propensity and utilization, and it is not evident through public outreach that there is strong unmet demand in this portion of the city, but this area may be suitable for alternative service delivery mechanisms such asmicrotransit to ensure citywide transit coverage.

From the community survey and public workshop feedback in addition to lessons learned from peer city benchmarking, there is also evidence to suggest other time-limited service could be effective, particularlymorning and afternoon service connecting the parts of the city with the greatest concentrations of enrolled students to local schools. It is not evident that there is strong unmet demand north of SantaMonica Boulevard for all-day fixed-route service, but exploring extending a fixed-route, commute-orientedservice to connect the Flats region to the upcoming D Line stations as part of a pilot program if resourcesare available, or if other potential pilot resources like microtransit vehicles are made available for timelimited service.

Microtra nsit
Microtransit is an emerging transit mode that builds on the traditional Dial-A-Ride model by chainingindividual trip requests together with on-demand routes generated through third-party software. Trips maybe requested using an app similar to those used by ride-hailing services or by phone through a dispatchcenter. In areas where fixed-route service is less attractive due to longer distances to access service orlonger trip times — generally areas of moderate to lower density — microtransit can offer a connection to thepublic transit network.A key advantage of microtransit is that a broader area with lower demand can remain connected to thegreater transit network using fewer resources than would be required to provide appropriate coverage with fixed-route service. Service can be deployed only as needed, and can remain available at key connection points such as the future D Line stations to capture outbound demand immediately duringperiods of lower utilization.

However, Microtransit can become capacity-constrained as ridership increases, and popular service at peak travel times can introduce longer wait times. Microtransit is also more resource-intensive on a perpassenger basis, as local experience through LA Metros Metro Micro program indicates that serviceefficiency is limited to approximately four passengers per service hour, while peer region experience in San Diego County with fixed-route circulators in lower-density suburban areas saw its least efficient routes averaging ten passengers per revenue hour.Microtransit is also challenged in areas with low all-day demand but higher concentrations of demand at specific times, such as office parks or school trips, as the lower-capacity vehicles are less suited to dealing with larger levels of demand. Regular customers with routine travel needs may also find daily trip reservations and changing daily wait time variability to be an impediment to perceived service reliability.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 23 ends

Prospective Service Design and Mode Suitability Analysis Boulevard at La Cienega Boulevard and Rodeo Drive, which can be best achieved with a dedicated linear bus route focusing on a limited number of arterial streets. The greatest transit circulation need within the community is for north-south connectivity, as identified through community input and LA Metro peer discussions. since the regional east-west connectivity continues to be strong with the upcoming D Line and surface transportation options along Sunset, Santa Monica, Wilshire, and Olympic Boulevards.

Fixed-route transit propensity is greatest from Santa Monica Boulevard to the south of the city, as the intensity of commercial activity and greater relative density provides the concentration of residents and commercial points of interest that offers the greatest potential ridership base. The residential land use patterns north of Santa Monica Boulevard are traditionally associated with lower all-day transit propensity and utilization. and it is not evident through public outreach that there is strong unmet demand in this portion of the city, but this area may be suitable for alternative service delivery mechanisms such as microtransit to ensure citywide transit coverage.

From the community survey and public workshop feedback in addition to lessons learned from peer city benchmarking, there is also evidence to suggest other time-limited service could be effective, particularly morning and afternoon service connecting the parts of the city with the greatest concentrations of enrolled students to local schools. It is not evident that there is strong unmet demand north of Santa Monica Boulevard for all-day fixed-route service, but exploring extending a fixed-route, commute-oriented service to connect the Flats region to the upcoming D Line stations as part of a pilot program if resources are available, or if other potential pilot resources like microtransit vehicles are made available for timelimited service.

Microtransit
Microtransit is an emerging transit mode that builds on the traditional Dial-A-Ride model by chaining individual trip requests together with on-demand routes generated through third-party software. Trips may be requested using an opp similar to those used by ride-hailing services or by phone through a dispatch center. In areas where fixed-route service is less attractive due to longer distances to access service or longer trip times - generally areas of moderate to lower density -- microtransit can offer a connection to the public transit network. A key advantage of microtransit is that a broader area with lower demand can remain connected to the greater transit network using fewer resources than would be required to provide appropriate coverage with fixed-route service. Service can be deployed only as needed, and can remain available at key connection points such as the future D Line stations to capture outbound demand immediately during periods of lower utilization. However. Microtransit can become capacity-constrained as ridership increases. and popular service at peak travel times can introduce longer wait times. Microtransit is also more resource-intensive on a perpassenger basis, as local experience through LA Metro's Metro Micro program indicates that service efficiency is limited to approximately four passengers per service hour, while peer region experience in San Diego County with fixed-route circulators in lower-density suburban areas saw its least efficient routes averaging ten passengers per revenue hour. Microtransit is also challenged in areas with low all-day demand but higher concentrations of demand at specific times. such as office parks or school trips, as the lower-capacity vehicles are less suited to dealing with larger levels of demand. Regular customers with routine travel needs may also find daily trip reservations and changing daily wait time variability to be an impediment to perceived service reliability. Kittelson & Associates, Inc.

September 30, 2022 Page 24
Unmet Needs Assessment and Suitability Analysis Prospective Service Design and Mode Suitability Analysis However, microtransit also offers a way of collecting travel demand data in real-time to determine where future fixed-route service can offer capacity to meet demand that may exceed the constraints ofmicrotransit service more effectively. Examples from an early pilot in Eugene, Oregon that replacedunderperforming fixed-route service saw demand exceed supply quickly, with many microtransit riders inthe pilot region making consistent trips throughout the week, and data from that pilot was used to relaunch several fixed-route lines that better matched the changes in demand observed through the microtransit pilot. Similarly, in San Diego, previous Dial-A-Ride service assets connecting business parks in the Sorrento Valley region with the North County Transit District’s Sorrento Valley COASTER commuter rail station weretransitioned into fixed-route services, as MIS discovered that standing trip reservations for repeated weekday trips significantly outnumbered unreserved trips.

Within Beverly Hills. a microtransit pilot is likely to be the most successful service strategy for portions of thecity north of Santa Monica Boulevard. Depending on the limitations of any prospective partner platform, which will have their own recommended criteria for service zones based on specific operating model configurations (such as whether to limit pickups to certain virtual stops), it may be possible for the full portion of the city north of Santa Monica Boulevard to be served by a single microtransit zone. As with fixed-route transit, network connectivity is critical to the success of any transit service, and limited specificconnections into the regional network outside of the microtransit zone would be strongly advised, such asincorporating the future D Line stations along Wilshire Boulevard as exciaves of the microtransit zone.

If evidence of peak commute-oriented demand exists within the microtransit zone, it may be more efficient to instead operate peak service along a fixed route to more efficiently capture demand and reduceoverall trip times, while transitioning back to a microtransit model outside peak commute hours. This wouldrequire the use of vehicles that would support both operating models, which will be discussed later in this memorandum.

Prospective Service Costs
Detailed costs will need to be developed based on an evaluation of exact route alignments using reasonable and realistic real-world travel speeds, but for purposes of high-level estimations ofrecommended service volumes, certain variables can be used.

Service costs are more predictable with contracted service, with most contracts offering service on a perhour basis. Additional detailed benchmarking into costs associated with contracting should be conducted to develop a more detailed independent cost estimate, as the range of costs can vary widely dependingon the responsibilities of the contractor, including to what extent any vehicle costs are associated with thecontract. For simplicity in adjusting further estimations, an estimated contract rate of $100 per vehicle perhour is assumed, but additional vetting is required and is a recommended future task.

A draft circulator routing was developed, operating with a one-way distance of 5.2 miles on an alignment using Beverly Drive, Olympic Boulevard, La Cienega Boulevard, Robertson Boulevard, Burton Way, Doheny Drive, Beverly Boulevard, and Foothill Road to represent an approximate all-day circulator route. With an estimated in-service average travel speed of 12 miles per hour, including stops for passengers and trafficsignals, one bus could complete one loop in under half an hour. To operate this loop bidirectionally with 15- minute frequency, four buses would be required per hour. Assuming an eighteen-hour service day and 365days a year of service, one fixed circulator route would have a gross annual operating cost of $2,628,000.

Further adjustments could be made to increase service in peak hours or to decrease service frequency much later in the evenings on weekdays when demand may be lower if included in a contract and staffinglevels are feasible.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 24 ends

Prospective Service Design and Mode Suitability Analysis However, microtransit also offers a way of collecting travel demand data in real-time to determine where future fixed-route service can offer capacity to meet demand that may exceed the constraints of microtransit service more effectively. Examples from an early pilot in Eugene, Oregon that replaced underperforming fixed-route service saw demand exceed supply quickly, with many microtransit riders in the pilot region making consistent trips throughout the week, and data from that pilot was used to relaunch several fixed-route lines that better matched the changes in demand observed through the microtransit pilot. Similarly, in San Diego, previous Dial-A-Ride service assets connecting business parks in the Sorrento Valley region with the North County Transit District's Sorrento Valley COASTER commuter rail station were transitioned into fixed-route services, as MTS discovered that standing trip reservations for repeated weekday trips significantly outnumbered unreserved trips.

Within Beverly Hills, a microtransit pilot is likely to be the most successful service strategy for portions of the city north of Santa Monica Boulevard. Depending on the limitations of any prospective partner platform, which will have their own recommended criteria for service zones based on specific operating model configurations (such as whether to limit pickups to certain virtual stops), it may be possible for the full portion of the city north of Santa Monica Boulevard to be served by a single microtransit zone. As with fixed-route transit, network connectivity is critical to the success of any transit service, and limited specific connections into the regional network outside of the microtransit zone would be strongly advised, such as incorporating the future D Line stations along Wilshire Boulevard as exclaves of the microtransit zone.

If evidence of peak commute-oriented demand exists within the microtransit zone, it may be more efficient to instead operate peak service along a fixed route to more efficiently capture demand and reduce overall trip times, while transitioning back to a microtransit model outside peak commute hours. This would require the use of vehicles that would support both operating models, which will be discussed later in this memorandum.

Prospective Service Costs
Detailed costs will need to be developed based on an evaluation of exact route alignments using reasonable and realistic real-world travel speeds, but for purposes of high-level estimations of recommended service volumes, certain variables can be used. Service costs are more predictable with contracted service. with most contracts offering service on a perhour basis. Additional detailed benchmarking into costs associated with contracting should be conducted to develop a more detailed independent cost estimate, as the range of costs can vary widely depending on the responsibilities of the contractor, including to what extent any vehicle costs are associated with the contract. For simplicity in adjusting further estimations, an estimated contract rate of $100 per vehicle per hour is assumed, but additional vetting is required and is a recommended future task. A draft circulator routing was developed, operating with a one-way distance of 5.2 miles on an alignment using Beverly Drive, Olympic Boulevard, La Cienega Boulevard, Robertson Boulevard, Burton Way, Doheny Drive, Beverly Boulevard, and Foothill Road to represent an approximate all-day circulator route. With an estimated in-service average travel speed of 12 miles per hour, including stops for passengers and traffic signals, one bus could complete one loop in under half an hour. To operate this loop bidirectionally with 15- minute frequency, four buses would be required per hour. Assuming an eighteen-hour service day and 365 days a year of service, one fixed circulator route would have a gross annual operating cost of $2,628,000. Further adjustments could be made to increase service in peak hours or to decrease service frequency much later in the evenings on weekdays when demand may be lower if included in a contract and staffing levels are feasible. Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability AnalysisMicrotransit service costs are more difficult to calculate if being operated directly, but asimilar hourly cost on the part of thecontractor could be reasonably expectedsince labor will be the primary cost driver, Providing one additional staffed bus to
operate within the city for eighteen hours aday with similar cost assumptions addsanother annual marginal cost of $657,000.

Similarly, a peak overlay service extendingfurther into residential areas and connectingto Beverly Hills High School could require an additional two peak vehicles per hour for twohours a day, depending on resourceavailability, service design, and input from school officials and parents depending on
need, and would add $68,000 per year ingross costs based on a 170-day academic calendar with similar assumptions.

Page 25 ends

Prospective Service Design and Mode Suitability Analysis a aro
*0” ,
\b
‘
ba.d.,
I a ‘‘
anon onoaov.n
a
a
a 1 a
.,,. ...‘ a, 0 $Du1.nC.nTaA,
a a.. nun wn..,u
Figure 8: A sample circulator alignment used tor rough service costing purposes. More detailed service planning is necessary todetermine more accurate potential service costs.

It should be strongly cautioned that these are very rough, high-level cost estimates intended as a basis fororder-of-magnitude level consideration for approximate budgeting purposes, and that more information with respect to service design and current real-world costs given recent inflation must be taken into consideration.

It is advised to start a new service with a best foot forward” approach, ensuring that initial service levels upon launch are convenient and competitive to attract and retain passengers. Launching service withlower levels of investment short of the previously mentioned attractive frequent service levels and makingplans to scale up service if demand increases will result in a first impression of service that is not usefulenough to meet enough needs for enough people, and additional demand is less likely to materialize.

Options Not Currently Recommended for FurtherConsideration While the urban form and demands of Beverly Hills could likely support one or more of several differenttransit operating models, at this time this study does not recommend immediate advancement of severalconcepts. Among several concepts considered but not advanced are:
• Partnerships with Los Angeles Metro to subsidize additional Metro service• Partnerships with neighboring municipalities to share existing models of transit service• Neighborhood Electric Vehicle (NEV) microtransit• Transportation Network Company (TNC) subsidies• Streetcar

PARTNERSHIP WITH LA METRO
A compelling option for many cities across the United States is to enter partnership arrangements with their regional transit operator, in this case LA Metro, to support additional transit service that otherwise is difficult raE Ft., ,
a
4 Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 25 ends

Prospective Service Design and Mode Suitability Analysis Figure 8: A sample circulator alignment used for rough service costing purposes. More detailed service planning is necessary to determine more accurate potential service costs. • I
0UM CARNY
tvtRt Govt
wig
co
OS(rsoN
"ws,
rt FLAT$ 4
$
»
Microtransit service costs are more difficult to calculate if being operated directly, but a similar hourly cost on the part of the contractor could be reasonably expected since labor will be the primary cost driver.

Providing one additional staffed bus to
operate within the city for eighteen hours a day with similar cost assumptions adds another annual marginal cost of $657,000.

Similarly, a peak overlay service extending
further into residential areas and connecting to Beverly Hills High School could require an additional two peak vehicles per hour for two hours a day, depending on resource
availability, service design, and input from school officials and parents depending on need, and would add $68,000 per year in
gross costs based on a 170-day academic calendar with similar assumptions. It should be strongly cautioned that these are very rough, high-level cost estimates intended as a basis for order-of-magnitude level consideration for approximate budgeting purposes, and that more information with respect to service design and current real-world costs given recent inflation must be taken into consideration. It is advised to start a new service with a "best foot forward" approach, ensuring that initial service levels upon launch are convenient and competitive to attract and retain passengers. Launching service with lower levels of investment short of the previously mentioned attractive frequent service levels and making plans to scale up service if demand increases will result in a first impression of service that is not useful enough to meet enough needs for enough people, and additional demand is less likely to materialize. Options Not Currently Recommended for Further Consideration
While the urban form and demands of Beverly Hills could likely support one or more of several different transit operating models, at this time this study does not recommend immediate advancement of several concepts. Among several concepts considered but not advanced are:
• Partnerships with Los Angeles Metro to subsidize additional Metro service • Partnerships with neighboring municipalities to share existing models of transit service • Neighborhood Electric Vehicle (NEV) microtransit • Transportation Network Company (TNC) subsidies • Streetcar

PARTNERSHIP WITH LA METRO
A compelling option for many cities across the United States is to enter partnership arrangements with their regional transit operator, in this case LA Metro, to support additional transit service that otherwise is difficult Kittelson & Associates, Inc.

September 30, 2022 Page 26
Unmet Needs Assessment and Suitability Analysis Prospective Service Design and Mode Suitability Analysisfor Metro to feasibly support within the financial constraints under which they operate. This model wouldpose a low-risk alternative for Beverly Hills by supporting the operations of the regional provider already operating within City limits to increase service levels, and depending on the exact arrangements of a potential agreement, allow the City to exert stronger influence over service decisions. Challenges with thismodel are a lack of precedent within Los Angeles County as explored by this memorandum’s authors as of the time of this writing, particularly given Los Angeles County’s long history with standalone municipaloperators supplementing regional service, as well as the considerable unknowns of acceptance of anyarrangement by an outside Board of Directors and unknowns over any agency-wide regional equityconsiderations. While this model could prove cost-effective to the City with lower administrative burden byleveraging existing public resources, the number of remaining variables are challenging to the success of aservice given a goal of entering a demonstration pilot period on a short time horizon.

PARTNERSHIP WITH NEIGHBORING MUNICIPALITIES
Similarly, entering into a contractual relationship with neighboring municipalities either directly operating (such as Culver City or Santa Monica) or contracting transit service of their own (such as West Hollywood) is also a practical and generally financially viable option. The City of Beverly Hills already offers an excellent example of this arrangement through their relationship with the City of West Hollywood for on-demand DialA-Ride service for qualifying residents. However, similar challenges to the above case of Metro exist in theunknowns that arise in any negotiations with outside parties. A partnership of this nature leverages economies of scale for efficient use of resources; however, due to the greater demand on timeline andresources, this is an option that is recommended for further consideration at a later date if a standalone City-led pilot proves successful.

NEV MICROTRANSIT
A service option benchmarked in other communities such as downtown Santa Monica and Huntington Beach is the prospect of a microtransit service operated by smaller neighborhood electric vehicles, or NEVs. These vehicles are lower-capacity, with up to six seats, and are speed-restricted to operate solely on lower-speed urban streets, This option has also been so far implemented within denser entertainment andretail districts where vehicular congestion is generally already high. While these vehicles are mostcommonly operated in partnership with third-party service providers and supported by advertising revenueto keep overall cost to municipalities or contracting business improvement districts low, their capacity limitations limit the upper range of their service efficiency on a passenger per hour basis, and often do notoffer the congestion reduction goals within their service areas since they are less able to efficiently pool trips. While effective service in the Triangle is critical to the success of a prospective Beverly Hills service, and while there is viability for a microtransit pilot in other portions of the city, the existing implementation model for this service is not seen as a good match for Beverly Hills’ climate and circulation needs and goals at this time.

TNC SUBSIDIES
An option explored by several less-dense municipalities in Southern California and across the United Statesis entering into partnership arrangements with Transportation Network Companies (TNCs), also referred to as ride-hailing services, with major examples being the Uber and Lyft platforms. This approach itself cantake several different shapes, with discounted trips throughout a defined zone. discounted trips originatingor terminating in a zone but with discounts available for trips leaving the zone, or discounted tripsoriginating or terminating at defined transit centers. This option has found qualified success in moresuburban areas such as San Clemente. California and Pinellas County, Florida, but in most instancesstructurally relies upon demand within a given region being low enough to warrant a subsidy for an outside Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 26 ends

Prospective Service Design and Mode Suitability Analysis for Metro to feasibly support within the financial constraints under which they operate. This model would pose a low-risk alternative for Beverly Hills by supporting the operations of the regional provider already operating within City limits to increase service levels, and depending on the exact arrangements of a potential agreement. allow the City to exert stronger influence over service decisions. Challenges with this model are a lack of precedent within Los Angeles County as explored by this memorandum's authors as of the time of this writing, particularly given Los Angeles County's long history with standalone municipal operators supplementing regional service, as well as the considerable unknowns of acceptance of any arrangement by an outside Board of Directors and unknowns over any agency-wide regional equity considerations. While this model could prove cost-effective to the City with lower administrative burden by leveraging existing public resources, the number of remaining variables are challenging to the success of a service given a goal of entering a demonstration pilot period on a short time horizon.

PARTNERSHIP WITH NEIGHBORING MUNICIPALITIES
Similarly, entering into a contractual relationship with neighboring municipalities either directly operating (such as Culver City or Santa Monica) or contracting transit service of their own (such as West Hollywood) is also a practical and generally financially viable option. The City of Beverly Hills already offers an excellent example of this arrangement through their relationship with the City of West Hollywood for on-demand DialA-Ride service for qualifying residents. However, similar challenges to the above case of Metro exist in the unknowns that arise in any negotiations with outside parties. A partnership of this nature leverages economies of scale for efficient use of resources; however, due to the greater demand on timeline and resources, this is an option that is recommended for further consideration at a later date it a standalone City-led pilot proves successful.

NEV MICROTRANSIT
A service option benchmarked in other communities such as downtown Santa Monica and Huntington Beach is the prospect of a microtransit service operated by smaller neighborhood electric vehicles, or NEVs. These vehicles are lower-capacity, with up to six seats, and are speed-restricted to operate solely on lower-speed urban streets. This option has also been so far implemented within denser entertainment and retail districts where vehicular congestion is generally already high. While these vehicles are most commonly operated in partnership with third-party service providers and supported by advertising revenue to keep overall cost to municipalities or contracting business improvement districts low, their capacity limitations limit the upper range of their service efficiency on a passenger per hour basis, and often do not offer the congestion reduction goals within their service areas since they are less able to efficiently pool trips. While effective service in the Triangle is critical to the success of a prospective Beverly Hills service, and while there is viability for a microtransit pllot in other portions of the city. the existing implementation model for this service is not seen as a good match for Beverly Hills' climate and circulation needs and goals at this time.

TNC SUBSIDIES
An option explored by several less-dense municipalities in Southern California and across the United States is entering into partnership arrangements with Transportation Network Companies (INCs), also referred to as ride-hailing services, with major examples being the Uber and Lyft platforms. This approach itself can take several different shapes, with discounted trips throughout a defined zone, discounted trips originating or terminating in a zone but with discounts available for trips leaving the zone, or discounted trips originating or terminating at defined transit centers. This option has found qualified success in more suburban areas such as San Clemente. California and Pinellas County, Florida. but in most instances structurally relies upon demand within a given region being low enough to warrant a subsidy for an outside Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 27 ends

Unmet Transit Needs
service proving more cost-effective — or freeing up enough resources that can be more successfully deployed elsewhere — than investment in standalone alternatives. In addition, the finances of TNC5 over the course of the COVID-19 pandemic and the changing regulatory environment in California raises concerns over the long-term sustainability of a program dependent on third-party platforms. The loweroccupancy vehicle operating model has also demonstrated negative traffic congestion impacts that are contrary to the climate and traffic goals shared by the City.

STREETCARFinally, the idea of a streetcar was considered but dismissed primarily on the basis of significant upfrant capital costs relative to unproven ridership demand. Streetcars are a popular mode in the United States indowntown regions for circulation, but pose significant challenges in operations — especially in mixed-trafficenvironments where streetcars share their operating space with other private vehicles and can become subject to delay. Maintenance space needs also pose a significant challenge given the limited land available within city limits. Streetcars are commonly viewed as offering a degree of transit permanence todowntown regions and have proven to be a popular economic development strategy, but whenpassenger surveys ask transit riders and the community (including the Beverly Hills community) aboutpriorities in transit service, usability and timeliness are more important than the specific mode. Streetcars may have a role in the future if other transit services prove to offer consistent passenger demand along aparticular alignment, but demand should first be proven through other modes with lower upfront capital costs such as fixed-route bus before consideration of more permanent investment.A thorough review of the 2020 Westside Cities Council of Governments Mobility Study, 2021 Beverly HillsComplete Streets Plan, and recent community surveys and outreach was conducted to identify the unmettransit needs in Beverly Hills. Throughout these discussions and review, several recurring themes becameapparent:

A majority of survey respondents view the current transit network’s service within Beverly Hills as ‘fair”or “poor” The existing transit network is viewed as unreliable and inconvenientSeveral destinations of interest are missing from the current network This section will highlight the specific weaknesses referenced through this project’s outreach with respect to missing connections, as well as key community points of interest that have been identified as integral toany municipal service network.

Gaps in Existing Transit Network
There are currently seven primary Metro lines that the City of Beverly Hills rely on to get to their destinations:

Lines 2, 4, 20/720, 28, 105, and 617. These lines are not only limited in frequency, but also limited in destinations. These lines serve the following respective corridors: Sunset Boulevard, Santa Monica Boulevard, Wilshire Boulevard, Olympic Boulevard, La Cienega Boulevard, Burton Way, and Beverly Drive.Despite strong coverage along east-west corridors with frequent crosstown service, there are little to no lines that connect these corridors together.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 27 ends

Unmet Transit Needs
service proving more cost-effective - or freeing up enough resources that can be more successfully deployed elsewhere -- than investment in standalone alternatives. In addition, the finances of TNCs over the course of the COVID-19 pandemic and the changing regulatory environment in California raises concerns over the long-term sustainability of a program dependent on third-party platforms. The loweroccupancy vehicle operating model has also demonstrated negative traffic congestion impacts that are contrary to the climate and traffic goals shared by the City.

STREETCAR Finally, the idea of a streetcar was considered but dismissed primarily on the basis of significant upfront capital costs relative to unproven ridership demand. Streetcars are a popular mode in the United States in downtown regions for circulation, but pose significant challenges in operations - especially in mixed-traffic environments where streetcars share their operating space with other private vehicles and can become subject to delay. Maintenance space needs also pose a significant challenge given the limited land available within city limits. Streetcars are commonly viewed as offering a degree of transit permanence to downtown regions and have proven to be a popular economic development strategy, but when passenger surveys ask transit riders and the community (including the Beverly Hills community) about priorities in transit service, usability and timeliness are more important than the specific mode. Streetcars may have a role in the future if other transit services prove to offer consistent passenger demand along a particular alignment, but demand should first be proven through other modes with lower upfront capital costs such as fixed-route bus before consideration of more permanent investment. [UNMET TRANSIT NEEDS
A thorough review of the 2020 Westside Cities Council of Governments Mobility Study, 2021 Beverly Hills Complete Streets Plan, and recent community surveys and outreach was conducted to identify the unmet transit needs in Beverly Hills. Throughout these discussions and review, several recurring themes became apparent:
■ A majority of survey respondents view the current transit network's service within Beverly Hills as "fair" or "poor"
The existing transit network is viewed as unreliable and inconvenient ■ Several destinations of interest are missing from the current network This section will highlight the specific weaknesses referenced through this project's outreach with respect to missing connections, as well as key community points of interest that have been identified as integral to any municipal service network.

Gaps in Existing Transit Network
There are currently seven primary Metro lines that the City of Beverly Hills rely on to get to their destinations:

Lines 2, 4, 20/720, 28, 105, and 617. These lines are not only limited in frequency, but also limited in destinations. These lines serve the following respective corridors: Sunset Boulevard, Santa Monica Boulevard, Wilshire Boulevard, Olympic Boulevard, La Cienega Boulevard, Burton Way, and Beverly Drive. Despite strong coverage along east-west corridors with frequent crosstown service, there are little to no lines that connect these corridors together.

Kittelson & Associates, Inc.

September 30, 2022 Page 28
Unmet Needs Assessment and Suitability Analysis Unmet Transit NeedsOnly one route is designed to provide some level of intro-community circulation within Beverly Hills — Line617, a new service that combined segments of previous routes in place prior to the NexiGen bus network rollout — but the frequency levels that Metro has been able to operate given current operator shortageshave left this service categorized as more of a lifeline service, operating once per hour per direction toensure that service is available for those without any other option, but remaining very difficult for mostcurrent and prosepective riders to incorporate into routine travel, Bridging the transit connection gap between the northern part of the City (above Sunset Boulevard) and the southern part of the City (south of Santa Monica Boulevard) is important since the northern part of Beverly Hills offers community members access to high-quality community public space and outdoor activity areas identified as key destinations during outreach, These areas include, but are not limited to,Greystone Mansion, Will Rogers Memorial Park, The Maltz Park, Virginia Robinson Gardens, ColdwaterCanyon Park, and Franklin Canyon Park.On a smaller scale, much interest has been shared with the project team on improving circulation within the Triangle, especially among visitors that may currently be compelled to travel between parking areas tovisit multiple destinations within the city. A transit solution that can help visitors arriving to Beverly Hills by car that can connect existing City parking structures near other destinations to key community destinations isconsidered valuable.

There has also been a desire to integrate local schools such as Beverly Hills High School into the transit network. However, this desire is unable to be met with the transit network in the City today given its location away from the major crosstown travel corridors.

The opening of the D Line stations along Wilshire Boulevard will bring an influx of demand for transit connections along this corridor. Lines 20 and 720 alone are operationally unable to meet this incoming demand, and their structure will help to carry passengers incrementally further in the same direction of travel, but will not themselves serve to meaningfully expand the reach of this new rail service. Moreover,there currently aren’t enough transit lines traveling north-south that are able to connect community members to these future stations.It is also key to note that transit is only a part of the solution to completely bridge the gaps within thenetwork. Non-motorized connections will be important to think through and tie into the transit network resolve first and last mile accessibility, especially with the opening of the D Line stations along Wilshire Boulevard. The Beverly Hills Complete Streets Plan has identified several nonmotorized links within the community that will be crucial in expanding the effective reach of the new rail service in addition to anyadded surface tiansit service.

Key Destinations Identified from Outreach
There are several key destinations that have been identified by the community through the online survey and the interactive mapping exercise from public meetings. The following destinations are points within the City of Beverly Hills where the community members currently go to or wishes to go to:
a Commercial and retail shops within the Business Triangle • Community assets such as City Hall, City Public Librarya Schools including Beverly Hills High School, Beverly Vista Middle School, and Horace Mann Elementary School
a Outdoor activity areas including La Cienega Park, Roxbury Park, Greystone Mansion, Will Rogers Memorial Park, The Maltz Park, Virginia Robinson Gardens, Coldwater Canyon Park, and FranklinCanyon Park Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 28 ends

Unmet Transit Needs
Only one route is designed to provide some level of intra-community circulation within Beverly Hills - Line 617, a new service that combined segments of previous routes in place prior to the NextGen bus network rollout -- but the frequency levels that Metro has been able to operate given current operator shortages have left this service categorized as more of a "lifeline" service, operating once per hour per direction to ensure that service is available for those without any other option. but remaining very difficult for most current and prosepective riders to incorporate into routine travel.

Bridging the transit connection gap between the northern part of the City (above Sunset Boulevard) and the southern part of the City (south of Santa Monica Boulevard) is important since the northern part of Beverly Hills offers community members access to high-quality community public space and outdoor activity areas identified as key destinations during outreach. These areas include, but are not limited to, Greystone Mansion, Will Rogers Memorial Park, The Maltz Park. Virginia Robinson Gardens. Coldwater Canyon Park. and Franklin Canyon Park.

On a smaller scale, much interest has been shared with the project team on improving circulation within the Triangle. especially among visitors that may currently be compelled to travel between parking areas to visit multiple destinations within the city. A transit solution that can help visitors arriving to Beverly Hills by car that can connect existing City parking structures near other destinations to key community destinations is considered valuable.

There has also been a desire to integrate local schools such as Beverly Hills High School into the transit network. However. this desire is unable to be met with the transit network in the City today given its location away from the major crosstown travel corridors.

The opening of the D Line stations along Wilshire Boulevard will bring an influx of demand for transit connections along this corridor. Lines 20 and 720 alone are operationally unable to meet this incoming demand. and their structure will help to carry passengers incrementally further in the same direction of travel. but will not themselves serve to meaningfully expand the reach of this new rail service. Moreover. there currently aren't enough transit lines traveling north-south that are able to connect community members to these future stations.

It is also key to note that transit is only a part of the solution to completely bridge the gaps within the network. Non-motorized connections will be important to think through and tie into the transit network resolve first and last mile accessibility, especially with the opening of the D Line stations along Wilshire Boulevard. The Beverly Hills Complete Streets Plan has identified several nonmotorized links within the community that will be crucial in expanding the effective reach of the new rail service in addition to any added surface transit service. Key Destinations Identified from Outreach There are several key destinations that have been identified by the community through the online survey and the interactive mapping exercise from public meetings. The following destinations are points within the City of Beverly Hills where the community members currently go to or wishes to go to:
■ Commercial and retail shops within the Business Triangle ■ Community assets such as City Hall, City Public Library ■ Schools including Beverly Hills High School. Beverly Vista Middle School, and Horace Mann Elementary School
■ Outdoor activity areas including La Cienega Park. Roxbury Park, Greystone Mansion. Will Rogers Memorial Park, The Maltz Park, Virginia Robinson Gardens, Coldwater Canyon Park. and Franklin Canyon Park Kittelson & Associates, Inc.

September 30, 2022 Page 29
Unmet Needs Assessment and Suitability Analysis Unmet Transit Needs • Grocery stores (e.g. Ralphs on Beverly Boulevard, Whole Foods Market on Crescent Drive, and Pavilions on Olympic Boulevard)
These destinations should be considered in any future route recommendation to continue to create an interconnected transportation system that allows a shift in travel from private passenger vehicles toalternative modes.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 29 ends

Unmet Transit Needs
■ Grocery stores (e.g. Ralphs on Beverly Boulevard, Whole Foods Market on Crescent Drive, and Pavilions on Olympic Boulevard)
These destinations should be considered in any future route recommendation to continue to create an interconnected transportation system that allows a shift in travel from private passenger vehicles to alternative modes.

Kittelson & Associates, Inc.

September 30. 2022 Page 30
Unmet Needs Assessment and Suitability Analysis Service Design Considerations

I SERVICE DESIGN CONSIDERATIONS
Principles of Service Design
For any public transit system to be successful, there are several key service area and service design attributes that need to be met, namely the concentration of origins and destinations both in geographicand temporal proximity, a degree of linearity in trip patterns that can be captured by one or more routes, and for areas with multiple routes, support for use of the complete network in route design and policy.

For a new transit service to be successful with respect to ridership and cost effectiveness, it needs to achieve most or all above goals. Listed below are strategies consistent with these goals that should beprioritized in any transit network development:
• Routes should connect areas and people with the highest transit propensity in as direct of a path as possible. These include areas with the greatest concentrations of residents and jobs, areas with the strongest retail and economic activity, and areas of greatest network interconnectivity. Linearity isalso important to ensure that service can carry riders as far as possible as quickly as possible with asfew operating resources as possible, such as buses, operator labor hours, and fuel. • Routes should be operated with the highest practical frequency, and with a span of service to match demand. In most urban areas with consistent all-day activity, rider expectations are increasingly supporting high service frequencies, or the time between bus arrivals at a given stop,of no more than 15 minutes. At high service frequencies of 10 minutes or better, riders feel comfortable using transit without consulting a schedule, arriving to a stop knowing that service willbe available soon. As service frequencies approach 15 minutes, more riders may seek out additional information such as schedules or real-time information to plan their trips, making using transit less intuitive and less convenient. As service frequencies exceed 15 minutes, more specificplanning will be required by riders, leaving these trips only suitable for those with more predictableschedules and travel behavior, such as commutes to school or work, or riders with more travel flexibility such as retirees. Span of service, or the start and end times for the service day, should alsobe consistent with relative activity levels, and ensure that transit remains a viable option a West Hollywood has found success emerging from the COVID-l9 pandemic with its PickUp service, offering a frequent circulator during evenings and weekends targeted toward the community’s peak entertainment hours.
• Routes should form (or contribute to) a comprehensive transit network. Much as a city is made up of a comprehensive set of streets that connect and operate as a uniform, cohesive network, so toodoes a successful transit network. Ensuring that each route adds value in connecting riders between different parts of the community while also connecting to other services that can facilitate complementary connections outside the community will ensure that service investments yield the greatest possible benefit. In the case of Beverly Hills, it is imperative that any new service leverages the regional investments made by the new Purple Line stations by providing connecting service. Routes should be spaced to minimize effective overlapping and duplicative service coverage, bearing in mind that the customary walking distance to access a service corridor is generally one-quarter mile.

Funding Sources
State, federal, and local resources exist to support funding capital infrastructure like vehicles, bus stop amenities, and transit facilities, and to varying extents. ongoing operations. Communities throughout Los Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

I SERVICE DESIGN CONSIDERATIONS
Principles of Service Design

Page 30 ends

Service Design Considerations
For any public transit system to be successful, there are several key service area and service design attributes that need to be met, namely the concentration of origins and destinations both in geographic and temporal proximity, a degree of linearity in trip patterns that can be captured by one or more routes, and for areas with multiple routes, support for use of the complete network in route design and policy.

For a new transit service to be successful with respect to ridership and cost effectiveness, it needs to achieve most or all above goals. Listed below are strategies consistent with these goals that should be prioritized in any transit network development:
• Routes should connect areas and people with the highest transit propensity in as direct of a path as possible. These include areas with the greatest concentrations of residents and jobs, areas with the strongest retail and economic activity, and areas of greatest network interconnectivity. Linearity is also important to ensure that service can carry riders as far as possible as quickly as possible with as few operating resources as possible, such as buses, operator labor hours, and fuel. • Routes should be operated with the highest practical frequency, and with a span of service to match demand. In most urban areas with consistent all-day activity, rider expectations are increasingly supporting high service frequencies, or the time between bus arrivals at a given stop, of no more than 15 minutes. At high service frequencies of 10 minutes or better, riders feel comfortable using transit without consulting a schedule, arriving to a stop knowing that service will be available soon. As service frequencies approach 15 minutes, more riders may seek out additional information such as schedules or real-time information to plan their trips, making using transit less intuitive and less convenient. As service frequencies exceed 15 minutes, more specific planning will be required by riders, leaving these trips only suitable for those with more predictable schedules and travel behavior, such as commutes to school or work, or riders with more travel flexibility such as retirees. Span of service, or the start and end times for the service day, should also be consistent with relative activity levels, and ensure that transit remains a viable option o West Hollywood has found success emerging from the COVID- I 9 pandemic with its PickUp service, offering a frequent circulator during evenings and weekends targeted toward the community's peak entertainment hours.
• Routes should form (or contribute to} a comprehensive transit network. Much as a city is made up of a comprehensive set of streets that connect and operate as a uniform, cohesive network, so too does a successful transit network. Ensuring that each route adds value in connecting riders between different parts of the community while also connecting to other services that can facilitate complementary connections outside the community will ensure that service investments yield the greatest possible benefit. In the case of Beverly Hills, it is imperative that any new service leverages the regional investments made by the new Purple Line stations by providing connecting service. Routes should be spaced to minimize effective overlapping and duplicative service coverage, bearing in mind that the customary walking distance to access a service corridor is generally one-quarter mile. Funding Sources State. federal, and local resources exist to support funding capital infrastructure like vehicles, bus stop amenities, and transit facilities, and to varying extents, ongoing operations. Communities throughout Los Kittelson & Associates, Inc.

September30, 2022 Page 31
Unmet Needs Assessment and Suitability Analysis Service Design Considerations Angeles County also benefit from local Measure M transportation funding, and municipalities have a history of trading Measure M funding allocations with other local dollars as needs arise. For example, West Hollywood purchases excess Measure M funding from other Los Angeles County communities for arranged prices in unassigned budget dollars to support its transit operations. As the federally designatedMetropolitan Planning Organization (MPO) for Los Angeles County, LA Metro will be able to provide furtherguidance on resources to support a transit pilot and potential permanent transit operation.

An important note is that while many transit operators provide commute-specific services tailored to certain segments of the population like school students, public transit funding support from the federal and state government is conditional upon the basis that service is open to the public without discrimination and cannot be exclusive to school students or other subsets of the population.

Below are sources of potential funding to explore:
• City of Beverly Hills
o Fare revenueso City General Fund support
• Los Angeles County
o Measure M funding, including bolstering the set local allocation with additional funding swaps
• State of California
o State Transit Assistance (STA)o Transit Development Act (TDA)o Transit and Intercify Rail Capital Program (TIRCP) • United States Government
o Formula Grants (to be coordinated with LA Metro)
• 5311 Urbanized Area Grants• Surface Transportation Block Grant (STBG)• Congestion Mitigation and Air Quality (CMAQ) Grant Program o Discretionary Grants
• 5339(c) Low- or No-Emission Vehicle Program• Rebuilding American Infrastructure with Sustainability and Equity (RAISE) Grant Program
ADA Access and Bus Stops
Transit operations must operate with accessibility at the forefront. All public transit vehicles are required to support personal mobility devices such as wheelchairs and mobility scooters by providing wheelchair ramps or lifts, and all public transit infrastructure including bus stops and bus shelters must be fully accessible topassengers with mobility limitations. Capital funding may be required to establish new bus stops in portionsof the city not currently served by transit to ensure accessibility.

In addition, fixed-route transit operation also requires the provision of complementary ADA paratransit service. It is possible that new service may be fully within the existing Access Services service area, butfuture analysis and detailed service planning will be required to fully determine any additional paratransitservice needs.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 3 ends

Service Design Considerations
Angeles County also benefit from local Measure M transportation funding, and municipalities have a history of trading Measure M funding allocations with other local dollars as needs arise. For example, West Hollywood purchases excess Measure M funding from other Los Angeles County communities for arranged prices in unassigned budget dollars to support its transit operations. As the federally designated Metropolitan Planning Organization (MPO) for Los Angeles County, LA Metro will be able to provide further guidance on resources to support a transit pilot and potential permanent transit operation. An important note is that while many transit operators provide commute-specific services tailored to certain segments of the population like school students, public transit funding support from the federal and state government is conditional upon the basis that service is open to the public without discrimination and cannot be exclusive to school students or other subsets of the population.

Below are sources of potential funding to explore:
• City of Beverly Hills
o Fare revenues o City General Fund support
• Los Angeles County
o Measure M funding, including bolstering the set local allocation with additional funding swaps
• State of California
o State Transit Assistance (STA)
o Transit Development Act (TDA) o Transit and Intercity Rail Capital Program (TIRCP) • United States Government
o Formula Grants (to be coordinated with LA Metro)
• 5311 Urbanized Area Grants
• Surface Transportation Block Grant (STBG) • Congestion Mitigation and Air Quality (CMAQ) Grant Program o Discretionary Grants
• 5339(c) Low- or No-Emission Vehicle Program • Rebuilding American Infrastructure with Sustainability and Equity {RAISE) Grant Program
ADA Access and Bus Stops
Transit operations must operate with accessibility at the forefront. All public transit vehicles are required to support personal mobility devices such as wheelchairs and mobility scooters by providing wheelchair ramps or lifts, and all public transit infrastructure including bus stops and bus shelters must be fully accessible to passengers with mobility limitations. Capital funding may be required to establish new bus stops in portions of the city not currently served by transit to ensure accessibility. In addition, fixed-route transit operation also requires the provision of complementary ADA paratransit service. It is possible that new service may be fully within the existing Access Services service area, but future analysis and detailed service planning will be required to fully determine any additional paratransit service needs. Kittelson & Associates, Inc.

September 30, 2022 Page 32
Unmet Needs Assessment and Suitability Analysis Operational Considerations

IOPERATIONAL CONSIDERATIONS
Fundamentals
The operation of transit service in any form requires several key non-negotiable attributes to be delivered.These attributes must be incorporated into any model from the beginning to ensure the greatest chance for system success.

Passenger safety and comfort: Service should include on-board security cameras, security at major transfer points, adequate lighting on board vehicles and at waiting areas, and operator training toensure that all riders feel comfortable and empowered to make use of the system withoutreservation or concern. Early system development discussions should include input on security,including obtaining a security contractor and developing an ambassador program to provide aface for the service, or developing a relationship with the Beverly Hills Police Department for selectoversight in limited circumstances. Bus stop and station areas, as well as primary travel paths toaccess these areas, should also be identified in conjunction with Public Works staff to ensure thatillumination at night is sufficient, blind spots are limited, and that any related concerns at key busstop locations can be addressed. Finally, vehicles and bus stop areas should be regularly maintained to ensure a continued perception of cleanliness. • Marketing and branding: While fast and frequent service can be enough to attract new passengers (as well as essential to retaining riders), ensuring a successful product launch willprovide the greatest chance for system success. Innovative branding to produce a mobilityproduct that feels consistent with the character of Beverly Hills will help increase public interest andawareness in the service and could encourage skeptics to try the service. West Hollywood providesan good local example with the distinctive artistic branding of their CityLine service, which drawsattention to the vehicles in operation. • Regional interconnectivity: The Los Angeles region has made great strides in producing a transit landscape that combines several different regional and municipal service providers into acoherent and consistent regional user experience. Shared attributes like the TAP fare payment system and integrated public information through Metro’s transit maps help to empower riders to make use of the transit network more broadly instead of limiting trips to one familiar operator. A Beverly Hills transit service should seek to build on the model of other municipal operators like Culver City and Santa Monica in partnering with Metro to share fare payment systems (if fares areto be charged) and public information.

Contracting
Public transit service can either be contracted or operated directly by cities or transit districts. A contracted approach would be recommended for a pilot project to reduce risk to the City by limiting assets on hand if the pilot is not continued, as contractors can also provide vehicles.

Research has shown that there is not a clear advantage to either approach with respect to operating costs, and local governments can still take on some portions of the overall cost of building and operating atransit service while relying upon an outside contractor for administration of maintenance and operations.A hybrid setup is common in many large California transit agencies such as Foothill Transit and municipalfleets such as those operated by the City of Pasadena, with the agencies and cities taking on responsibility for real estate, facilities, and vehicle procurement to take advantage of capital funding opportunitiesavailable to government agencies, but outsourcing operations and maintenance to outside contractors.Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 32 ends

Operational Considerations
Fundamentals
The operation of transit service in any form requires several key non-negotiable attributes to be delivered. These attributes must be incorporated into any model from the beginning to ensure the greatest chance for system success.
• Passenger safety and comfort: Service should include on-board security cameras, security at major transfer points, adequate lighting on board vehicles and at waiting areas, and operator training to ensure that all riders feel comfortable and empowered to make use of the system without reservation or concern. Early system development discussions should include input on security, including obtaining a security contractor and developing an ambassador program to provide a face for the service, or developing a relationship with the Beverly Hills Police Department for select oversight in limited circumstances. Bus stop and station areas, as well as primary travel paths to access these areas, should also be identified in conjunction with Public Works staff to ensure that illumination at night is sufficient, blind spots are limited, and that any related concerns at key bus stop locations can be addressed. Finally, vehicles and bus stop areas should be regularly maintained to ensure a continued perception of cleanliness. • Marketing and branding: While fast and frequent service can be enough to attract new passengers (as well as essential to retaining riders), ensuring a successful product launch will provide the greatest chance for system success. Innovative branding to produce a mobility product that feels consistent with the character of Beverly Hills will help increase public interest and awareness in the service and could encourage skeptics to try the service. West Hollywood provides an good local example with the distinctive artistic branding of their Cityline service, which draws attention to the vehicles in operation. • Regional interconnectivity: The Los Angeles region has made great strides in producing a transit landscape that combines several different regional and municipal service providers into a coherent and consistent regional user experience. Shared attributes like the TAP fare payment system and integrated public information through Metro's transit maps help to empower riders to make use of the transit network more broadly instead of limiting trips to one familiar operator. A Beverly Hills transit service should seek to build on the model of other municipal operators like Culver City and Santa Monica in partnering with Metro to share fare payment systems (if fares are to be charged) and public information. Contracting Public transit service can either be contracted or operated directly by cities or transit districts. A contracted approach would be recommended for a pilot project to reduce risk to the City by limiting assets on hand if the pilot is not continued, as contractors can also provide vehicles.

Research has shown that there is not a clear advantage to either approach with respect to operating costs, and local governments can still take on some portions of the overall cost of building and operating a transit service while relying upon an outside contractor for administration of maintenance and operations. A hybrid setup is common in many large California transit agencies such as Foothill Transit and municipal fleets such as those operated by the City of Pasadena, with the agencies and cities taking on responsibility for real estate, facilities, and vehicle procurement to take advantage of capital funding opportunities available to government agencies, but outsourcing operations and maintenance to outside contractors.

Kittelson & Associates, Inc.

September 30, 2022 Page 33
Unmet Needs Assessment and Suitability Analysis Operational ConsiderationsIf a Beverly Hills pilot were to continue into a permanent fixture a more detailed financial analysis would be recommended to determine the most cost-effective path forward, but given time constraints and the lackof adequate land to support an appropriately sized transit operating facility within city limits, beginning witha turn-key contract would offer the greatest flexibility and responsiveness, but may result in above-averageoperating costs compared to more mature operations.

Vehicles
A wide range of vehicles could be considered for fixed-route services, while microtransit operations would benefit from a narrower range of smaller vehicles. There are vehicle types that would be appropriate forboth operating models and could add additional flexibility to change the nature of a pilot program or alternate between service models in a region over the course of a day.

In either circumstance, all vehicles must provide accommodation for riders using personal mobility devices such as wheelchairs and mobility scooters, such as through a wheelchair ramp or lift. Vehicles with wheelchair ramps are preferable on routes where high volumes of mobility devices can be expected, aswheelchair lift operation is a more time-consuming process that requires the operator to exit the vehicle, introducing additional delay to service.As well, transit operators in California are now required to meet the California Air Resources Board’s Innovative Clean Transit regulation, with non-zero-emission vehicles operated in revenue service to be fullyphased out by 2035. Given the stated community environmental goals for this project, the state of current operating technology, and the need for a future transition, a transit pilot project should seek to use batteryelectric vehicles.

Fixed-route service along major corridors is most commonly provided using a standardized 40-foot transit bus and 60-foot articulated transit bus model, while circulator service like that operated by the Los Angeles Department of Transportation’s DASH service may use 30- and 35-foot transit buses that are more maneuverable on streets with tighter turns and with the same heavy-duty build quality rated for FTArequired 12 year, 500,000 mile minimum vehicle lifespans. but at the expense of reduced passengercapacity compared to larger vehicles. Other circulator services like West Hollywood’s CityLine make use ofcutaway buses, using bus bodies placed on conventional passenger van frames. These vehicles aregenerally less expensive and can be somewhat more maneuverable. but are not tested to the samestandards as transit buses and are rated for a shorter service lifespan. Most commercially availablecutaway buses for transit use also include wheelchair lifts.Operating costs can decrease with the use of smaller vehicles as energy efficiency will generally increase, but it should be noted that the energy cost associated with vehicle operation is a relatively small portion ofoverall operating costs, with most operating cost associated with labor, both in the form of drivers as well asmaintenance overhead.Microtransit service is generally operated using smaller vehicles, such as cutaway buses or large passengervans modified to include wheelchair capabilities. A distinct advantage to the use of passenger vans, more specifically those rated to seat 10 or fewer people. is that a commercial driver’s license is not required for operation in California. However, the reduced capacity of these vehicles limits their successful use in moreconventional higher-capacity applications.

It is likely that securing a cutaway van fleet for a pilot program would offer the greatest flexibility for pilotprogram development while likely providing appropriate capacity for a fixed-route circulator.

Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 33 ends

Operational Considerations
If a Beverly Hills pilot were to continue into a permanent fixture a more detailed financial analysis would be recommended to determine the most cost-effective path forward, but given time constraints and the lack of adequate land to support an appropriately sized transit operating facility within city limits, beginning with a turn-key contract would offer the greatest flexibility and responsiveness, but may result in above-average operating costs compared to more mature operations.

Vehicles
A wide range of vehicles could be considered for fixed-route services, while microtransit operations would benefit from a narrower range of smaller vehicles. There are vehicle types that would be appropriate for both operating models and could add additional flexibility to change the nature of a pilot program or alternate between service models in a region over the course of a day.

In either circumstance, all vehicles must provide accommodation for riders using personal mobility devices such as wheelchairs and mobility scooters, such as through a wheelchair ramp or lift. Vehicles with wheelchair ramps are preferable on routes where high volumes of mobility devices can be expected, as wheelchair lift operation is a more time-consuming process that requires the operator to exit the vehicle, introducing additional delay to service. As well, transit operators in California are now required to meet the California Air Resources Board's Innovative Clean Transit regulation, with non-zero-emission vehicles operated in revenue service to be fully phased out by 2035. Given the stated community environmental goals for this project, the state of current operating technology, and the need for a future transition, a transit pilot project should seek to use battery electric vehicles.

Fixed-route service along major corridors is most commonly provided using a standardized 40-foot transit bus and 60-foot articulated transit bus model, while circulator service like that operated by the Los Angeles Department of Transportation's DASH service may use 30- and 35-foot transit buses that are more maneuverable on streets with tighter turns and with the same heavy-duty build quality rated for FT Arequired 12 year, 500,000 mile minimum vehicle lifespans, but at the expense of reduced passenger capacity compared to larger vehicles. Other circulator services like West Hollywood's Cityline make use of cutaway buses, using bus bodies placed on conventional passenger van frames. These vehicles are generally less expensive and can be somewhat more maneuverable, but are not tested to the same standards as transit buses and are rated for a shorter service lifespan. Most commercially available cutaway buses for transit use also include wheelchair lifts. Operating costs can decrease with the use of smaller vehicles as energy efficiency will generally increase, but it should be noted that the energy cost associated with vehicle operation is a relatively small portion of overall operating costs, with most operating cost associated with labor, both in the form of drivers as well as maintenance overhead. Microtransit service is generally operated using smaller vehicles, such as cutaway buses or large passenger vans modified to include wheelchair capabilities. A distinct advantage to the use of passenger vans, more specifically those rated to seat 10 or fewer people, is that a commercial driver's license is not required for operation in California. However, the reduced capacity of these vehicles limits their successful use in more conventional higher-capacity applications. It is likely that securing a cutaway van fleet for a pilot program would offer the greatest flexibility for pilot program development while likely providing appropriate capacity for a fixed-route circulator. Kittelson & Associates, Inc.

September 30, 2022 Page 34
Unmet Needs Assessment and Suitability Analysis Service Performance Measurement

I SERVICE PERFORMANCE MEASUREMENT
Transit service performance can be measured in several ways, but common metrics for urban transit system planners and administrators to track closely are passengers per revenue hour, or how many passengers are carried for every hour a vehicle operated in revenue service, and passenger subsidy, which is the overallcost of providing service on a per-passenger basis. It is recommended that performance targets bedefined in advance of a pilot program to help guide evaluation of whether the program is operatingsustainably and whether resources are being used to the greatest benefit of the community. Forcomparison, the below are fiscal year 2019 systemwide passengers per revenue hour metrics for neighboring transit operators’ fixed-route bus service as reported to the Federal Transit Administration:
• Los Angeles Metropolitan Transit Authority: 39.0 passengers/revenue hour• Los Angeles DASH: 28.3 passengers/revenue hour• Culver CityBus: 27.1 passengers/revenue hour• Santa Monica Big Blue Bus: 22.5 passengers/revenue hour• West Hollywood CityLine: 6.0 passengers/revenue hour However, while performance metrics can inform planners of the relative efficiency of different services, it is important to note that metrics focusing only on performance of the service in isolation can only form partof an overall analysis of the role of service in the community. To this end, the State of California has beenopenly considering revisions to its Transit Development Act (TDA) funding guidelines for several years toreduce an emphasis on farebox recovery, or the share of revenue contributed toward transit operationsfrom passenger fares, noting that meeting broader community goals may require the operation of servicethat places less of an emphasis on absolute cost efficiency. In addition, the remaining effects of changes intravel patterns resulting from the COVID-19 pandemic make it challenging to compare service performance today to service performance prior to March 2020. Most agencies have seen declines inoverall ridership levels, and consequently declines in overall service efficiency indicators.

For example, many communities and agencies have set goals toward reducing community Vehicle Miles Traveled (VMT), which measures overall vehicle travel volumes, and can be a metric that rises and falls in parallel with carbon dioxide (C02) emissions and air pollutants like fine particulate matter depending on the community’s vehicle fleet mix. A strategy toward achieving this goal would be to ensure that servicealternatives exist and are attractive to capture trips, which may require operating more transit vehicles inservice to provide more attractive service frequency than may be most cost-efficient.This project sought to provide a needs assessment for the feasibility of additional transit service within the City of Beverly Hills, and has found that there are gaps in existing transit service and potential newconnections that can be made to better support regional transportation investments and improve localcirculation. This project has also found that this need can be practically met by the City of Beverly Hills on its own, with viable options for exploring a pilot program using contracted service.

As establishment of a pilot program is explored further, there are several additional recommended considerations to explore:
• A second community survey focused on community preferences to determine what service attributes and which potential benefits or incentives would encourage use of public transportation within Beverly Hills
Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 34 ends

Service Performance Measurement

I SERVICE PERFORMANCE MEASUREMENT
Transit service performance can be measured in several ways, but common metrics for urban transit system planners and administrators to track closely are passengers per revenue hour, or how many passengers are carried for every hour a vehicle operated in revenue service, and passenger subsidy, which is the overall cost of providing service on a per-passenger basis. It is recommended that performance targets be defined in advance of a pilot program to help guide evaluation of whether the program is operating sustainably and whether resources are being used to the greatest benefit of the community. For comparison, the below are fiscal year 2019 systemwide passengers per revenue hour metrics for neighboring transit operators' fixed-route bus service as reported to the Federal Transit Administration:
• Los Angeles Metropolitan Transit Authority: 39.0 passengers/revenue hour • Los Angeles DASH: 28.3 passengers/revenue hour • Culver CityBus: 27.1 passengers/revenue hour • Santa Monica Big Blue Bus: 22.5 passengers/revenue hour • West Hollywood Cityline: 6.0 passengers/revenue hour However, while performance metrics can inform planners of the relative efficiency of different services, it is important to note that metrics focusing only on performance of the service in isolation can only form part of an overall analysis of the role of service in the community. To this end, the State of California has been openly considering revisions to its Transit Development Act (TDA) funding guidelines for several years to reduce an emphasis on farebox recovery, or the share of revenue contributed toward transit operations from passenger fares, noting that meeting broader community goals may require the operation of service that places less of an emphasis on absolute cost efficiency. In addition, the remaining effects of changes in travel patterns resulting from the COVID-19 pandemic make it challenging to compare service performance today to service performance prior to March 2020. Most agencies have seen declines in overall ridership levels, and consequently declines in overall service efficiency indicators. For example, many communities and agencies have set goals toward reducing community Vehicle Miles Traveled (VMT), which measures overall vehicle travel volumes, and can be a metric that rises and falls in parallel with carbon dioxide (CO2) emissions and air pollutants like fine particulate matter depending on the community's vehicle fleet mix. A strategy toward achieving this goal would be to ensure that service alternatives exist and are attractive to capture trips, which may require operating more transit vehicles in service to provide more attractive service frequency than may be most cost-efficient. I NEXT STEPS This project sought to provide a needs assessment for the feasibility of additional transit service within the City of Beverly Hills, and has found that there are gaps in existing transit service and potential new connections that can be made to better support regional transportation investments and improve local circulation. This project has also found that this need can be practically met by the City of Beverly Hills on its own, with viable options for exploring a pilot program using contracted service. As establishment of a pilot program is explored further, there are several additional recommended considerations to explore:
• A second community survey focused on community preferences to determine what service attributes and which potential benefits or incentives would encourage use of public transportation within Beverly Hills
Kittelson & Associates, Inc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 35 ends

Acknowledgements
• More detailed route planning to provide specific fixed-route service alignments and operating cost units to inform prospective future Requests for Information (RFI5), including any capability ofoperating microtransit service using a third-party platform • Release of an RFI to explore microtransit suitability in more detail with third-party technology providers
• Early partner discussions with LA Metro to explore available finances that could support development of a standalone City transit operation, including federal, state, and county fundingopportunities and whether outside funds could be available for a pilot program • Development of a strategy to transition existing City operating assets and programs, specifically for Dial-A-Ride and trolley service, to be guided by the results of a pilot program The Kittelson & Associates project team would like to recognize the following individuals for contributingtheir time and knowledge to our understanding of the transportation landscape in the surrounding region:
• Francisco Gomez, Transportation Planner, City of West Hollywood• Diana Chang, Manager of Mobility, City of Culver City• Carl Torres, Transportation Planning Manager, LA Metro• Joe Forgiarini, Senior Director, Service Performance & Analysis, LA Metro Kittelson & Associates, nc.

September 30, 2022
Unmet Needs Assessment and Suitability Analysis

Page 35 ends

Acknowledgements
• More detailed route planning to provide specific fixed-route service alignments and operating cost units to inform prospective future Requests for Information (RFIs), including any capability of operating microtransit service using a third-party platform • Release of an RFI to explore microtransit suitability in more detail with third-party technology providers
• Early partner discussions with LA Metro to explore available finances that could support development of a standalone City transit operation, including federal, state, and county funding opportunities and whether outside funds could be available for a pilot program • Development of a strategy to transition existing City operating assets and programs, specifically for Dial-A-Ride and trolley service, to be guided by the results of a pilot program ]ACKNOWLEDGEMENTS
The Kittelson & Associates project team would like to recognize the following individuals for contributing their time and knowledge to our understanding of the transportation landscape in the surrounding region:
• Francisco Gomez, Transportation Planner, City of West Hollywood • Diana Chang, Manager of Mobility, City of Culver City • Carl Torres, Transportation Planning Manager, LA Metro • Joe Forgiarini, Senior Director, Service Performance & Analysis, LA Metro Kittelson & Associates, Inc.

AATTACHMENT T
T
A
C
H
M
E
NT
22 PROPOSED TRANSIT FIXED-ROUTE
November 2022
Colgate Ave
Clifton Way
z
c’ •E fl Z N 3 9
acenn
Schod
C, C
Charlevlfle Blvd 0
D
9 h..

ATTACHMENT-i
CC-TPC LIAISON 08-22-23
e0

CITYWIDE MICROTRANSIT
• On-Demand shared ride
• Collect data for other
potential fixed route(s)
0 W3rdSt
0 t
4th
# arleviUe Blvd
9 It. p4 ‘1 Z Z Z Z
DaytonWa .
4 PHASE1: -
•Everyl5minutes
•Bi-directional .
hre Blvd ,.1.81.Designated stops:W.IhBl..
— -Commercialcorridors -
-Residential area adjacent
9 FUTURE PHASE 2: ChievB -La Cienega Park • Peak AM/PM hours ,. - Beverly Vista .
• Every 30 minutes South evef School
• Additional stops 9 -
Gregory - South 5MB Gregory :Iay Gregory Way
-HighSchool
Beverly Hills
‘HIgh School - Roxbury Park ,.
— — ————————
Roxbury Park a
2 . 3 0. -
0 D. - — 9 -
1 C)
C)
rD
C)
0,
COrexe
vi

0. C

0. Chalmers Dr
E
C)
r La Clenega
ra m Park 0 aC
C)

0. <S

0. W °IYm
x -
—-
el (
! N
z 4
LI (u 3 %
r o
e z £3
<c
u
u ; - a.u a
S EIm
S Oak
S Pol S Map
0 re]
au
Is pIo
S Camd
S Peck Bedford
Le Doux Rd IS @up
SHolt
±g
$
E
i
rescent Dr
j
d
S
CanonOr
s
s
Reevd Dr
st @ C
q
s '? !- £
5~
6s 3
db-La Cienega Blvd
t
N Clark Dr S Clark Dr
i >
e"" es
oateor
see" S
g2°' N Hamilton Dr
N Dor/
Dr
c =
d
«
~ %
La Cienega Blvd
N Maple N Oakh t
N Swall
NLa Pe
o
5 0 c
5 >-
N Palm D
3 0
P
75 Doheny Dr
n Blvd
cc 0 2 f
LA
I
uJ c
tN 2< N
u. tN € ± ± u @ zz
E a
¢
o
g
p z a. or
0 a.
0 u LA
Attachment 2
B0785-0001\3036554v1.doc

REQUEST FOR PROPOSALS

TO PROVIDE

MICTROTRANSIT TURNKEY SERVICES
RFP No. 25-350-7

CITY OF BEVERLY HILLS
Public Works Department
345 Foothill Road
Beverly Hills, CA 90210
November 15, 2024
Submittal Deadline: 5:00 p.m., December 18, 2024
Contact:

Martha Eros, Transportation Planner
Email: [email protected]

Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 2 of 30
B0785-0001\3036554v1.doc

TABLE OF CONTENTS

1.0 Introduction………………………………………………………………….3

2.0 Scope of Work……………………………………………………………….4

3.0 Qualifications………………………………………………………………13

4.0 Submission and Evaluation………………………………………………...13

5.0 Evaluation Process and Criteria……………………………………………17

6.0 General Terms and Conditions…………………………………………….17
Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 3 of 30
B0785-0001\3036554v1.doc

1.0 INTRODUCTION
The City of Beverly Hills Complete Streets Plan includes goals and policies for exploring a fast, reliable local transit system with connections to the upcoming Metro D (Purple) Line subway stations. With the absence of convenient parking at both Metro subway stations, interest in local transit connections is expected when one of the subway stations opens in late 2025. The City’s Climate Action & Adaptation Plan also recommends developing a locally operated transit system to help shift away from single-occupancy vehicles and reduce carbon emissions. A transit needs assessment, including public surveys and outreach, was conducted in 2022, and the findings recommend a pilot demand-based microtransit program that would serve both commercial and residential areas within the City of Beverly Hills.

The City of Beverly Hills’ (City) Public Works Department Transportation Bureau invites qualified transportation contractors (Contractor) to respond to a Request for Proposals (RFP) for microtransit turnkey services for the City. The City is looking for a Contractor that can develop and implement a flexible transit service for an 18-month pilot program (Program) in the form of mobility on-demand or microtransit services for general public use within the City of Beverly Hills and identified destinations. The City seeks a turnkey/all-in-one service to include the necessary technology, labor, and vehicles for complete operations management.

The vehicles provided by the Contractor shall be zero-emission, accommodate 8-10 passengers, accommodate wheelchairs/bikes, and traverse all City streets (including the hillside areas). The City encourages autonomous technology for the proposed fleet. The Program shall provide the option for passengers to request rides via mobile app, website, and phone/call center to book a ride.

Tentative Proposal Evaluation Schedule
The City has established the following target dates for evaluation and scheduling purposes. The following dates are tentative, non-binding, and are subject to change without prior notice.

RFP Release ....................................................................................................... November 15, 2024 Deadline for Contractors to Submit Questions.………….………………… ...November 22, 2024 Anticipated Deadline for City to Respond to Questions………………………..December 4, 2024 Proposals Due and Received by……………………………………………….December 18, 2024 Recommend City Council to Award (tentative)……………………….........February/March 2025 The deadline for Contractors to submit questions via PlanetBids is November 22, 2024 at 5 p.m.

Proposals for this program will be due on December 18, 2024 at 5 p.m., and must include all requirements. Late or incomplete proposals will not be accepted. The City reserves the right to modify these dates at any time, with appropriate notice to prospective contractors.

Submit Questions To:

Please submit questions regarding the RFP via PlanetBids.

Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 4 of 30
B0785-0001\3036554v1.doc
Obtaining RFP Documents and Submitting Proposals
The RFP documents may be viewed on and downloaded from the City’s PlanetBids portal:
https://vendors.planetbids.com/portal/39493/portal-home Section 4.0 of this RFP provides a list of items that must or may be included in a complete proposal.

All Contractors are required to submit their proposals electronically to the PlanetBids website. The electronic bid system will close exactly at the date and time set forth in this RFP or as changed by addenda. Contractors are responsible for submitting complete proposals before the closing time set forth in this RFP or as changed by addenda.

NOTE: Pushing the submit button on the electronic bid system may not be instantaneous; it may take time for the Contractor’s documents to upload and transmit before the proposal is accepted.

It is the Contractor’s sole responsibility to ensure their documents are uploaded, are transmitted, and arrive in time electronically. The City of Beverly Hills will have no responsibility for proposals that do not arrive in a timely manner, no matter what the reason.

All proposals and accompanying documentation will become the property of the City and will not be returned.

Any questions regarding any error, omission, or ambiguity, and any requests for clarification, should be submitted through the PlanetBids website no later than the given deadline. Questions or requests for clarification received after the deadline or sent/posed directly to staff will be disregarded.

For any other questions, please contact the City at [email protected].

2.0 SCOPE OF WORK
The following is a list of tasks that are intended to be the responsibility of the Contractor pursuant to this RFP. Submittals are encouraged to propose a comprehensive service approach, describing a specific operational model, technology platform, service territory, vehicle acquisition scheme, and a marketing and performance monitoring plan.

Task 1: Project Management
All communications between the City and the Contractor shall be coordinated through their respective Project Managers and/or their designee. In the area of Project Management, the Contractor shall:
 Schedule and facilitate monthly Project Development Team (PDT) meetings, including a kick-off meeting and meetings at key milestones interagency meetings, field reviews, advisory and/or stakeholder group meetings, and other project related meetings.  Contractor shall prepare agendas, minutes, and sign in sheets for all meetings.

Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 5 of 30
B0785-0001\3036554v1.doc
 The City Project Manager must be kept abreast of all coordination with outside agencies, prior to any meeting with an outside agency or organization.  The Contractor will prepare and maintain a detailed work plan in accordance with any major milestones and deadlines to launch, expand, and/or make changes to the service. The Contractor will maintain and update the work plan as approved in writing by the City Project Manager.
 Coordinate project resources and work so that milestones are met in an efficient manner.

Tasks will be laid out to minimize implementation time and cost while taking into consideration resource and time constraints such as City staff availability.  Oversee activity of subcontractors, subconsultants, or other contracting parties (collectively, “Subcontractors”), if any. The Contractor's Project Manager will ensure that individuals performing tasks have appropriate skill levels and credentials.  Coordinate all required deliverables including but not limited to service launch, operations, vehicle acquisition, installation and configuration of software and hardware, documentation and training, branding and marketing, and/or performance monitoring and reporting, per the final contract agreement.
 Contractor shall submit to the City Project Manager invoices monthly to include expenses for the preceding month. Invoices shall include documentation for all services rendered during the period of the invoice. Contractor shall provide additional documentation upon request by the City to further substantiate expenses submitted for reimbursement, as feasible.

Task 2: Service Planning & Parameters
The Contractor shall coordinate with the City Project Manager and staff to develop, approve, and/or refine the service model, including specific stops, routes, schedules, service coverage areas, and cost structure, as it applies.

Tentative Service Performance Standards
 Service Operating Hours
o The service shall operate seven (7) days per week, including holidays, from 6:00 AM to 10:00 PM Pacific Time.
o The Contractor may propose modified service hours for holidays subject to City written approval. Any changes to service hours must be communicated to the public at least 30 days in advance.
 Passenger Wait Times
o Average wait time shall not exceed 15 minutes from request to pickup o 90% of all rides must be picked up within 20 minutes of request o During peak hours (7:00-9:00 AM and 4:00-7:00 PM weekdays), average wait times shall not exceed 18 minutes
o The Contractor shall provide real-time notifications to passengers if estimated wait times will exceed these thresholds
Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 6 of 30
B0785-0001\3036554v1.doc
 Service Reliability
o Minimum 98% completion rate for accepted ride requests o Maximum 2% cancellation rate by service provider
o Vehicle availability shall be maintained at minimum 90% of contracted fleet size during service hours
 Coverage Requirements
o Services must be available throughout the entire City of Beverly Hills and specific locations adjacent to the City
o Maximum walking distance to pickup location shall not exceed 1/8 mile in commercial areas and 1/4 mile in residential areas, unless specifically agreed to by the City Project Manager
Some considerations for the service model may involve consideration of regularly occurring special events. The Contractor shall be available for field visits to assess safety, ADA access, pedestrian amenities, and other considerations when developing the service model. The Contractor will perform all planning and work necessary to launch and continue operations on agreed-upon service plan for the Program and to implement any future Council-approved expansions of hours of operation and fleet supply. The Contractor will coordinate with the City on updates related to the technology platform and related rider and driver apps, and the coordination of the delivery and integration of additional vehicles to be operated on the platform in the city. This may include coordination on additional product features, as made available by the Contractor.

Task 3: Deployment Plan and Operations
The Contractor shall coordinate, manage, and control all necessary Program activities which shall include operating the services, dispatch, vehicle maintenance and management personnel; providing driver and other personnel training; preparing administrative procedures, performance statistics, and financial records; and developing methods to maximize service efficiency. The Contractor shall submit a draft plan for City Project Manager approval detailing all tasks necessary to deploy the Program showing the relationship across all components. Include timelines and indicate responsible parties. Please share a deployment plan consistent with a April 2025 target launch date. Deployment tasks shall include but are not limited to:
 Vehicle procurement, lease, or vehicle availability
 Stop or station preparation (i.e., signage, installation of amenities)  Operator procurement and training
 Administrative processes
 Test runs
 Promotional events and marketing
 Full-service deployment
The Contractor shall work closely with the City to incorporate stakeholder and community feedback into the service model, as appropriate. The final service plan is subject to the written approval of the City. Should changes be proposed to the service, an updated deployment plan for the change must be shared with and approved by the City in writing.

Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 7 of 30
B0785-0001\3036554v1.doc
Task 4: Marketing and Outreach
The Contractor shall develop a comprehensive marketing and promotions plan based upon previous experience deploying a new transit, rideshare, or similar service. The City envisions a combination of hard copy marketing materials, promotional events and subsidies, and online advertising. Contractor shall continually work with the City to implement a unified marketing and promotional program that increases community awareness of the Program and maximizes its success in a matter that is context sensitive with the City's various communities and population to successfully engage various community members that may be hard to reach - zero-car households, non-English speakers, persons without internet access, elderly, persons with disabilities, etc. As reasonable, the City will cooperate with and provide support to the Contractor to promote the service and create local awareness. The City will provide ongoing support to the Contractor’s team by providing useful local insights and leveraging existing marketing platforms to amplify the Program. Contractor and the City shall collaborate on the following key marketing activities during the course of the Program:
 Press releases and media campaigns
 Rider acquisition campaigns
 Ongoing promotional campaigns
 Outreach to major employers within the City
 Partnerships with key City stakeholders and community organizations Task 5: Data Collection, Visualization, and Ownership
The Contractor should be able to provide program operational records and additional statistical information as requested to assist the City in complying with other funding and/or legislative requirements. The City will use the information requested in this section to monitor and evaluate the productivity of the service. Information should be accessible to the City through a backend dashboard or information must be regularly submitted to the City according to the reporting schedule to be established by the City. All data generated as a result of the Program service shall become the property of the City. Data listed below are preferable:
 Data on each unique ride request that includes date/time of request, number of passengers, Wheelchair Accessible Vehicle (WAV) request, origin and destination (in both address and longitude/latitude), ride price, ride distance, ride duration, ride rating, etc.  Number of ride requests and breakdown of detailed status of ride request (completed ride, unaccepted proposal, rider no show, booked out of service hours, seat unavailable, other error)
 Scheduled pick-up time and actual pick-up time - wait time for pick-up for all trips, difference between estimated wait time and actual wait time for all trips (e.g., on-time and not on-time trips)
 Walking distance from origin location to planned pick-up location - not necessary if operating a curb-to-curb service model
 Travel time (i.e., pick-up to drop-off) for all trips, difference between estimated travel time and actual travel time for all trips
Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 8 of 30
B0785-0001\3036554v1.doc
 Travel distance (i.e., pick-up to drop-off) for all trips.  Utilization - average number of riders per vehicle per hour  Trip cancellations and no-show hotspots/concentrations by day and time of day, as well as methods for diagnosis (e.g., increased wait time due to traffic congestion)  Percentage of trips paid by various payment methods (if applicable)  Percentage of trips booked through app, through phone-based service, and through webbased platform  Rideshare/shared rides percentage (i.e., percent of vehicle hours with more than one trip/multiple passengers who did not book a “group trip” on a vehicle at the same time, for vehicle hours with no group trips)
 Rideshare/shared ride counts (i.e., all vehicle hours with trip counts, broken down by day and hour with group trips factored in)
 Percentage of passengers requiring assistance with mobility devices  Customer satisfaction data including comments, complaints, ratings, and other information submitted through the app/web-based platform
 Rider demographics- age, gender, ethnicity, etc. - if feasible.  Vehicle miles travelled
 Ability to aggregate data and see averages, medians, mode, standard deviation, etc. as determined useful planning purposes
 Ability to manage data by various time frames (days, hours of the day, days of the week, weeks, months, years)
 Ability to manage data by geographical zones or subsets of the City The Contractor shall provide reporting that is consistent/compliant with funding requirements such that the City can seek potential grant funding opportunities. For example, the City must be able to access the following data:
 Vehicle revenue hours - The hours that vehicles are scheduled to or actually travel while in revenue service. Vehicle revenue hours include: layover/recovery time. Vehicle revenue hours exclude: deadhead, operator training, vehicle maintenance testing; and other nonrevenue uses of vehicles.  Vehicle revenue miles - The miles that vehicles are scheduled to or actually travel while in revenue service. Vehicle revenue miles include: layover/recovery time. Vehicle revenue hours exclude: deadhead, operator training, vehicle maintenance testing; and other nonrevenue uses of vehicles.  Passengers per Revenue Hour
 Passengers per Revenue Mile
 Accidents/Vehicle roadcalls/breakdowns
 On-time performance
 Passenger complaints and compliments
Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 9 of 30
B0785-0001\3036554v1.doc
Technical Specifications
The Contractor shall furnish all tools, materials, supplies, and equipment to perform the tasks outlined in the Scope of Work. This may require a technology platform that can achieve the following functions:

A. In real time, aggregate riders traveling from multiple origins to multiple destinations in an exceptionally efficient way that optimizes the balance between maximizing vehicle utilization across the fleet and maintaining excellent quality of customer experience.

B. Support fully automated scheduling, dispatch, and reservations, allowing passengers to book trips in real-time via phone, mobile application, and/or web browser. If pre-scheduled bookings are recommended as part of the transit model, indicate how is demand managed with pre-scheduled rides.

C. Flexible in developing pricing models to meet the City’s various service goals and objectives such as pricing by distance, day/time of ride, location, or additional passenger pricing. The platform should also have the ability to apply different rate structures to passengers (i.e. elderly, disabled, student, etc.). Please indicate what pricing models can be developed. Please indicate whether City staff may have the ability to apply discounted rate structures to passengers who meet eligibility requirements.

D. Provide promotional pricing such as free rides, promo codes, or vouchers if requested by the City.

E. Allow an option for people to request a wheelchair/mobility device on-demand vehicle. If the service can provide bike racks and are not available on all vehicles, the platform should allow people to request a vehicle with a bike rack.

F. Enhance connections to other mode choices - such as biking, walking, or taking existing fixed route transit. Please indicate if the platform can provide real time information regarding other transportation options, recommend optional trip routes, or allow multi-modal booking. Please indicate if the platform is able to integrate with third party fare collection systems utilized by other transportation/mobility options in the region.

G. Access to related ridership and performance data and the ability to create reports with ease. The technology platform should allow the City to self-generate standard reports, graphs, and/or spatial data or the Contractor should provide assistance in organizing data through graphs or spatial analysis. Data should be available for direct download in a format accessible by the City (CSV, excel, shapefiles for ArcGIS, etc.).

Equipment and Supplies
The Contractor shall furnish all tools, materials, supplies, and equipment to perform the tasks outlined in the Scope of Work. This may require providing vehicles, vehicle maintenance, mobile data terminals, tablet computer, or other equipment. The Contractor shall work closely with the Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 10 of 30
B0785-0001\3036554v1.doc
City to develop a vehicle plan that clearly outlines the fleet size, fixed and variables costs, operations and maintenance needs.

The City is looking for a turnkey microtransit demand responsive service, so vehicle supply throughout the service period may be different through the day or day of week (i.e. peak commute hours may have more vehicles available to manage demand or holidays may have less vehicles due to lower anticipated ridership) adjust based on historic or anticipated ridership trends.

The City desires vehicles that are zero-emission, can accommodate 8-10 passengers, can accommodate wheelchairs/bikes, and can traverse all City streets (including the hillside areas).

The City also encourages autonomous technology for the proposed fleet.

Vehicle Specifications
 Zero-Emission Vehicle Requirements:
o Primary preference: Battery-electric vehicles (BEV)
o Secondary preference: Plug-in hybrid electric vehicles (PHEV) o Minimum range for BEVs: 150 miles per charge under typical operating conditions o For PHEVs: Minimum 30 miles of electric-only range
o If zero-emission vehicles are not available in sufficient quantities, the Contractor must provide a timeline for fleet transition to zero-emission vehicles within the first 6 months of service
 Passenger capacity: 8-10 passengers minimum
 Accessibility: At least 50% of fleet must be ADA-compliant Wheelchair Accessible Vehicles
 Maximum vehicle age: 3 years at service start, not to exceed 5 years during contract term  All vehicles must have:
o Automatic door systems
o Security cameras
o GPS tracking systems
o Climate control
o Bike racks (minimum 2 bike capacity)
o Service branding and vehicle identification information o Ability to traverse all City streets (including the hillside areas).

All vehicles and vehicle equipment required by this RFP shall be maintained in good repair and in a condition satisfactory to the City. All vehicles, including wheelchair accessible vehicles, must meet all safety and mechanical standards established by Federal, State, County, and local law, rules, or regulations. Contractor shall assume all responsibility for the proper maintenance of the vehicles. It shall be the expressed responsibility of the Contractor to assume all coordination with the original manufacturer of the vehicles if necessary to keep the vehicles in safe and good operating condition. This shall include negotiating and processing all vehicle warranty claims through the manufacturer's own warranty department, and is responsible for collection of any monies, extended warranties, or credits as a result, for the length of time the warranty is in effect.

Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 11 of 30
B0785-0001\3036554v1.doc
The extent of the proposed preventive maintenance program shall be an important consideration in the selection of the Contractor.

The Contractor, in collaboration with the City, shall develop a brand and logo suitable for multilingual users and campaigns that builds upon, and integrates with, the City's existing brand.

Vehicles should have decals or be wrapped with an agreed-upon design that indicates the vehicles are for the City of Beverly Hills’ program.

Each vehicle must receive a daily pre-trip inspection by the operator prior to being placed in service. Daily pre-trip inspections must be supplemented by regular time and mileage maintenance inspections to ensure safe and proper operating condition of vehicles. Inspection of each vehicle shall be completed after its daily service to ensure all lights are functioning, all seating is secure and that all tires, wheels, lugs, air brake systems (if applicable), wheelchair lifts (if applicable) and exit doors are in proper operating condition.

Proposals will be evaluated on the ability of the Contractor’s fleet to service the general populations, as well as elderly and limited mobility clients. Contractors shall describe the proposed fleet in detail, showing how the fleet meets ADA requirements and the service needs of the City.

The driver/operator user interface should be safe and easy to use, and include audible and clear messaging indicating passenger updates and stop changes. Driving instructions should be available in list, map, and turn-by-turn voice instructions to ensure safe operation.

The Contractor shall provide a vehicle storage and maintenance facility site that is within reasonable distance (within approximately 6-8 miles) and a response time of 30 minutes from the City. The Contractor shall also provide a plan on where/how the vehicles will be charged/fueled.

Autonomous Vehicle Integration
The City seeks to position this service for future integration of autonomous vehicle technology.

The Contractor shall maintain awareness of autonomous vehicle developments and provide the City with regular updates on potential implementation opportunities. Any autonomous vehicle deployment shall require separate City written approval and must comply with all applicable federal, state, and local regulations.

Staffing and Support Services
The Contractor shall provide staffing and support services necessary to perform the tasks outlined in the Scope of Work.

Vehicle Operator
The Contractor will provide all driver personnel, as well as be responsible for providing driver and other personnel training. The City does not require the Contractor to have a specified number of affiliated drivers, so long as the Contractor can ensure that it will provide a sufficient number of drivers to provide its proposed level of service at any given time during service hours, including periods of peak demand. Vehicle operators must have all appropriate California Driver's Licenses and Certificates as well as any other licenses, certificates or training required by applicable Federal, Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 12 of 30
B0785-0001\3036554v1.doc
State, and local regulations. Contractor shall indicate their hiring standards in their proposal including their background check policies and procedures. All drivers shall be employees of Contractor and Contractor shall be solely responsible for payment of all employees' wages and benefits.

Vehicle operators must be trained in all operational procedures relating to the system. Training must include customer service techniques for interacting with the public in a helpful and courteous manner, basic information about the route and the City of Beverly Hills, and sensitivity and empathy training directed towards the needs of elderly and passengers with limited mobility, in compliance with the Americans with Disabilities Act. Contractor shall describe how it will maintain an ongoing employee safety and training program. Contractor shall provide City with incident reports and notify the City if any incident may affect the available fleet.

Dispatching and Customer Service
Although the City expects that users will utilize a mobile app or web browser to book their trips and seek customer service assistance, an option for users without a smart phone or internet access is necessary to create an equitable program. The Contractor shall have capable and courteous personnel who are responsible for taking requests, accurately record appointments; properly manage complaints and customer service requests and responding to telephone inquiries regarding transportation services. Customer service support should also be available by email.

Training and Technology Support
The Contractor shall provide training and manuals for the City staff needed to monitor, assess, access data and develop reports using the dashboard and other tools provided by the Contractor.

The Contractor shall provide training to City staff such that they are well-equipped and understand the technology aspects of the service to provide assistance and general support to the end user (public). The Contractor shall provide technology support and assistance as issues or questions arise with City staff, via phone and email during service hours. The Contractor shall provide any training to City staff to understand any products or platforms available to City staff. The Contractor will work with the City to determine the most effective and cost-efficient method of training.

Term of Contract
The initial term of the Contract is 2 years at the City's discretion. The City also reserves the right to extend the Contract for up to 3 additional 1-year terms (individually, “Extension”) upon the same terms and conditions as parties agreed to in the Contract. Thus, parties agree the Contract may be for a total of 5 years upon the same terms and conditions as parties agreed in the Contract.

Notwithstanding the foregoing, the City is not obligated to extend the Contract for any amount of time. If there is outstanding work within the Scope of Work at the end of the initial two year term of the Contract and the City requires time to solicit for and secure an alternative contractor, Contractor shall continue to provide the services within the Scope of Work on a month-to-month basis, not to exceed six (6) months, at the same cost, terms, and conditions in effect at the termination of the Contract. The City shall give Contractor at least thirty (30) days written notice of such a need and the anticipated timeline to secure an alternative contractor.

Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 13 of 30
B0785-0001\3036554v1.doc

3.0 QUALIFICATIONS
The minimum requirements Contractors must meet to be eligible are:
 Qualification to conduct business in Beverly Hills
 Not have been debarred by Federal, State, or local government  Current or previous experience operating similar programs in at least three (3) cities  W2 employees and local-hire plan/program
 Ability to provide ride data and metrics, including map-based data

4.0 SUBMISSION AND EVALUATION
Contractors wishing to be considered shall submit the following:

1. Format
o Submit electronically via PlanetBids as discussed in Section 1.0 of this RFP o The proposal shall be signed by an official authorized to bind the company o Include a table of contents in the proposal
o Submit Cost Proposal rates and budget in a separate file electronically on PlanetBids via the Cost File section
o Include company name and RFP number in files submitted electronically

2. Cover Letter
Provide a cover letter that includes the following:
o Complete name, or business name, of the Contractor preparing the proposal o Name, title, email address, mailing address, and phone number of the person the City should contact regarding the proposal
o Statement that the proposal is an offer to complete the Scope of Work listed in the RFP and the offer (including the Cost Proposal rates and budget) remains valid for at least ninety (90) business days after the Proposal due date. o Statement whether the Contractor, or any individual who would perform work under the Contract, has a possible conflict of interest and, if so, the nature of that conflict. The City reserves the right to terminate the Contract if its execution would or could create, or give the appearance of creating, a conflict of interest. The City, at its sole discretion, shall make all determinations on the existence or appearance of a conflict of interest.
o Statement of acknowledgment that the City’s standard contract and insurance have been reviewed and accepted by the Contractor with or without qualification. o Statement whether the Contractor intends to use Subcontractors to complete the Scope of Work. If so, identify the name of each proposed Subcontractor, their mailing address, email address, and phone number. Include the service related to the Scope of Work that the Subcontractor is anticipated to perform. o Signature of a person empowered to bind the Contractor to the provisions of the RFP and any contract awarded pursuant to it.

Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 14 of 30
B0785-0001\3036554v1.doc

3. Work Proposal
The proposal narrative should provide a straightforward, concise delineation of capabilities to satisfy the RFP and should include the following:
o Experience:
 Describe why the Contractor is qualified to provide the services described in the RFP.
 Describe the length of time the Contractor has been providing the services described in the RFP.
 Describe the total number of clients for which the Contractor has provided the services outlined in the RFP.
 Describe the Contractor’s experience with public agency transportation programs.
 Describe how the Contractor has promoted its services and/or encouraged communities to utilize the services outlined in the RFP. o Staffing:
 Provide a plan overview for how the Program will be staffed (e.g., managers, drivers, operational staff), including organizational charts, shift hours, local hiring, and employment plan.
 Name the key staff that would be involved in the Program. List all relevant licenses, specialties and trainings held by the key staff.  State how many employees the Contractor has in total.  List the office location(s) and identify the office(s) from which services will be performed.
o Method of Approach:
 Provide a narrative detailing the operational and organizational approach the Contractor will take to timely fulfill the Scope of Work  Describe how the Contractor will complete the Scope of Work, communicate with the City throughout the work, advance the Program goal/objectives, and provide continuity on work efforts.  Describe how the Contractor will address or mitigate the following potential risks or challenges:
 Operational shortfalls due to staffing issues, vehicle issues/maintenance, or mobile app issues.
 Vehicles involved in collisions or vandalism.
 Unruly or uncooperative passengers
 Recharging/fueling of vehicles during service hours (if necessary)  Explain the data and reporting systems that will be used to routinely evaluate program performance. Provide a sample metric report from a previous/current program as an appendix.
 Provide an outline of what you will need from the City (if any) to implement the contract successfully.

Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 15 of 30
B0785-0001\3036554v1.doc
o Subcontractor Information (if any)
 Describe the specific requirements of the RFP that the Subcontractor will perform.
 Describe why the Subcontractor is qualified to provide the services described in the RFP.
 Describe the length of time the Subcontractor has been providing the services described in the RFP.
 Provide a plan overview for how the Subcontractor will staff the Program.

Include organizational charts, shift hours, local hiring, and employment plan.
 Name the key Subcontractor staff that would be involved in the Program.

List all relevant licenses, specialties and trainings held by the key staff.  State how many employees the Subcontractor has in total.  List the office location(s) and identify the office(s) from which services will be performed.

4. References
o Include a list of three (3) references for whom the services required to complete the Scope of Work have been performed by the Contractor within the last three (3) years.
o The list of references should include name, email address, mailing address, brief description of services completed relevant to the RFP, and point of contact who can attest to the quality and effectiveness of the services.

5. Cost Proposal
o The Cost Proposal should provide information about hours of operation, number of vehicles per day, monthly cost, and total annual cost.
o Submit Cost Proposal rates and budget in a separate file (preferably Excel format) electronically on PlanetBids via the Cost File section

6. Business License
o Attach a copy of a proof of registration with the Secretary of State to conduct business in the State of California

7. Insurance
(a) Contractor shall at all times during the term of this Agreement carry, maintain, and keep in full force and effect, insurance as follows:

(1) A policy or policies of Comprehensive General Liability Insurance, with minimum limits of Two Million Dollars ($2,000,000) for each occurrence, combined single limit, against any personal injury, death, loss or damage resulting from the wrongful or negligent acts by Contractor.

Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 16 of 30
B0785-0001\3036554v1.doc
(2) A policy or policies of Comprehensive Vehicle Liability Insurance covering personal injury and property damage, with minimum limits of One Million Dollars ($1,000,000) per occurrence combined single limit, covering any vehicle utilized by Contractor in performing the Scope of Work required by this Agreement. (3) Workers’ compensation insurance as required by the State of California.
(b) Contractor shall require each of its sub-contractors to maintain insurance coverage which meets all of the requirements of this Agreement. (c) The policy or policies required by this Agreement shall be issued by an insurer admitted in the State of California and with a rating of at least a A+;VII in the latest edition of Best’s Insurance Guide.
(d) Contractor agrees that if it does not keep the aforesaid insurance in full force and effect City may either immediately terminate this Agreement or, if insurance is available at a reasonable cost, City may take out the necessary insurance and pay, at Contractor’s expense, the premium thereon.
(e) At all times during the term of this Agreement, Contractor shall maintain on file with City’s Risk Manager a certificate or certificates of insurance on the form set forth in Exhibit C, attached hereto and incorporated herein, showing that the aforesaid policies are in effect in the required amounts. Contractor shall, prior to commencement of work under this Agreement, file with City’s Risk Manager such certificate or certificates. The general liability insurance shall contain an endorsement naming the City as an additional insured. (f) The general liability and vehicle liability policies required under this Agreement shall contain an endorsement providing that the policies cannot be canceled or reduced except on thirty (30) days prior written notice to City, and specifically stating that the coverage contained in the policies affords insurance pursuant to the terms and conditions as set forth in the Agreement.
(g) The insurance provided by Contractor shall be primary to any coverage available to City. The policies of insurance required by this Agreement shall include provisions for waiver of subrogation.
(h) Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, Contractor shall either reduce or eliminate the deductibles or selfinsured retentions with respect to City, or Contractor shall procure a bond guaranteeing payment of losses and expenses.
(i) The insurance coverage amounts required under the Agreement do not limit City’s right to recover against Contractor and its insurance carriers. o Affirmative statement of compliance with indemnity and insurance. Requirements are specified in this section and Attachment A.

Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 17 of 30
B0785-0001\3036554v1.doc

8. Acknowledgment of All Addenda
o If any addenda are posted, all firms planning to submit proposals must acknowledge addenda via PlanetBids.

Please Note: Any substitution of key personnel during the Program shall require the prior written approval of the City and submittal of the above information for the proposed new team members for City review.

5.0 EVALUATION PROCESS AND CRITERIA
The City’s review process will emphasize the following criteria:

A. Contractor’s history and capacity to perform the service (15%) B. Contractor’s qualifications and experience with programs of similar size and scope (15%) C. Contractor’s familiarity with and proximity to the program (10%) D. Contractor’s proposed program approach and schedule (30%) E. Contractor’s proposed technology and fleet (20%)
F. Submitted references from programs of similar size and scope (10%) Submittals will be evaluated by a review panel from the City’s Public Works Department. The City will provide the answers to any questions submitted by an interested party after the release of the RFP to all parties that have indicated interest in the RFP via PlanetBids.

After the closing date, the City intends to hold oral interviews and select a recommended contractor, after which a negotiated agreement between the City and recommended contractor will be presented to the City Council for consideration. Work will commence on the Commencement Date set forth in the Contract. .

6.0 GENERAL TERMS AND CONDITIONS
The City of Beverly Hills shall not, in any event, be liable for any pre-contractual expenses incurred by the Contractor. Pre-contractual expenses are defined as expenses incurred by the Contractor in:

1. Preparing the response to this RFP.

2. Submitting the proposal to the City.

3. Negotiating with the City in any matter related to this proposal.

4. Any other expenses incurred by the Contractor prior to the date of the executed agreement.

The City of Beverly Hills reserves the right to reject any and all proposals. Further, the City makes no representations that any agreement will be awarded to any contractor responding to this RFP.

Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 18 of 30
B0785-0001\3036554v1.doc
The City reserves the right to cancel the services at any phase or at any point in any phase and pay the Contractor only for costs of services satisfactorily performed and incurred to that date. All data, documents and other products used or developed during the course of facilitating the Complete Streets Planning services will remain the property of the City.

6.1 Contract between Contractor and City
The City will prepare an agreement for implementation between the Contractor and the City. See Attachment A for a sample of the City’s services contract. Please indicate in your proposal any exceptions taken to the requirements of the agreement.

6.2 Late Proposals It is the Contractor's sole responsibility to ensure that proposals are received prior to the scheduled closing time specified in this RFP. Proposals will not be accepted after the deadline.

6.3 Withdrawal of Proposals
Proposals may be withdrawn if written notification of withdrawal of the proposal is signed by an authorized representative of the Contractor and received by the City prior to the closing time for receipt of proposals. Proposals cannot be changed or withdrawn after the time designated for receipt.

6.4 Rejection of Proposals
The City reserves the right to reject any and all proposals received in response to this RFP and to waive any informality in any proposal if it is determined to be in the best interest of the City to do so.

6.5 Proposal Validity Period
Submission of a proposal will signify the Contractor's agreement that the proposal, and contents thereof, are valid for ninety (90) days following the submission of the proposal and shall become part of the agreement that is negotiated with the Contractor.

6.6 Documents to be Construed Together
The RFP proposal and all documents incorporated by reference in a contract entered into between the Contractor and the City, and all modifications of said documents, shall be construed together as one document.

6.7 Extra Work or Materials
The City shall have the right to make alterations, eliminations and additions in the scope of work.

Exercise of such right shall in no way void the agreement. The value of such extra work shall be agreed upon by the City and the Contractor in writing in accordance with the agreement.

Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 19 of 30
B0785-0001\3036554v1.doc

6.8 News Releases
News releases pertaining to the award of any agreement resulting from this RFP shall not be made without prior written approval of the City. The City's name shall not appear on customer lists, advertising or other materials used to promote the Contractor’s services without prior written approval of the City.

6.9 Closing
The City reserves the right to accept or reject any and all proposals, waive any defects or irregularity, modify the proposal terms or the selection process or negotiate a contract, along with a revised Scope of Work, schedule and fees with the Contractor. The City reserves the right to eliminate or add tasks identified in the Scope of Work with a corresponding reduction or increase in the fee. Staff shall present its recommendation to the City Council and is subject to its approval.

ATTACHMENT A

SAMPLE AGREEMENT
B0785-0001\3036554v1.doc

AGREEMENT BETWEEN THE CITY OF BEVERLY HILLS AND

CONTRACTOR'S NAME FOR BRIEFLY DESCRIBE PURPOSE

OF CONTRACT
NAME OF CONTRACTOR: Insert name of contractor
RESPONSIBLE PRINCIPAL OF CONTRACTOR: Insert name, title CONTRACTOR'S ADDRESS:

CONTRACTOR'S E.1.N/TAX I.D. NO.:

CITY'S ADDRESS:

COMMENCEMENT DATE:

TERMINATION DATE:

CONSIDERATION:

Gen/AP Contract Template [Rev. 06/24 v.15]
Insert street address
Insert city, state, zip code
Attention: Insert name, title
Insert contractor's Tax I.D. No.

City of Beverly Hills
455 N. Rexford Drive
Beverly Hills, CA 90210
Attention: Dept. Head's Name, Title
Insert date of commencement
Insert date of termination
Not to exceed $ Insert consideration amount
Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 21 of 30
B0785-0001\3036554v1.doc

AGREEMENT BETWEEN THE CITY OF BEVERLY HILLS AND

CONTRACTOR'S NAME FOR BRIEFLY DESCRIBE PURPOSE

OF CONTRACT
THIS AGREEMENT is made by and between the City of Beverly Hills (hereinafter called "CITY"), and Insert contractor's name (hereinafter called "CONTRACTOR").

RECITALS
A. CITY desires to have certain services and/or goods provided as set forth in Exhibit A (the "Scope of Work"), attached hereto and incorporated herein.

B. CONTRACTOR represents that it is qualified and able to perform the Scope of Work.

NOW, THEREFORE, the parties agree as follows:

Section 1. CONTRACTOR's Scope of Work. CONTRACTOR shall perform the Scope of Work described in Exhibit A in a manner satisfactory to CITY and consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing in the same locality under similar conditions. CITY shall have the right to order, in writing, changes in the Scope of Work. Any changes in the Scope of Work by CONTRACTOR must be made in writing and approved by both parties. The cost of any change in the Scope of Work must be agreed to by both parties in writing.

Section 2. Time of Performance.

CONTRACTOR shall commence its services under this Agreement upon the Commencement Date or upon a receipt of a written notice to proceed from CITY.

CONTRACTOR shall complete the performance of services by the Termination Date set forth above.

D The City Manager or her designee may extend the time of performance in writing for two additional one-year terms or such other term not to exceed two years from the date of termination pursuant to the same terms and conditions of this Agreement.

Section 3.
(a)
Compensation.

Compensation
If compensation is based on an hourly rate or other rates D CITY agrees to compensate CONTRACTOR for the services and/or goods provided under this Agreement, and CONTRACTOR agrees to accept in full satisfaction for such services, a sum not to exceed the Consideration set forth above and more particularly described in Exhibit B, attached hereto and incorporated herein, based on the rates set forth in Exhibit B.
2 Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 22 of 30
B0785-0001\3036554v1.doc
If compensation is based on a flat fee
D CITY agrees to compensate CONTRACTOR for the services and/or goods provided under this Agreement, and CONTRACTOR agrees to accept in full satisfaction for such services, a sum not to exceed the Consideration set forth above and more particularly described in Exhibit B.
(b) Expenses
If no reimbursable expenses
D The amount set forth in paragraph (a) shall include reimbursement for all actual and necessary expenditures reasonably incurred in the performance of this Agreement (including, but not limited to, all labor, materials, delivery, tax, assembly, and installation, as applicable). There shall be no claims for additional compensation for reimbursable expenses.

If CITY reimburses for certain expenses in addition to compensation 0 CONTRACTOR shall be entitled to reimbursement only for those expenses expressly set forth in Exhibit B. Any expenses incurred by CONTRACTOR which are not expressly authorized by this Agreement will not be reimbursed by CITY. (c) Additional Services. CITY may from time to time require CONTRACTOR to perform additional services not included in the Scope of Work. Such requests for additional services shall be made by CITY in writing and agreed upon by both parties in writing.

Section 4. Method of Payment. CITY shall pay CONTRACTOR said Consideration in accordance with the method and schedule of payment set forth in Exhibit B.

Section 5. Independent Contractor. CONTRACTOR is and shall at all times remain, as to CITY, a wholly independent contractor. Neither CITY nor any of its agents shall have control over the conduct of CONTRACTOR or any of CONTRACTOR's employees, except as herein set forth. CONTRACTOR shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of CITY.

Section 6. Assignment. This Agreement shall not be assigned in whole or in part, by CONTRACTOR without the prior written approval of the City Manager. Any attempt by CONTRACTOR to so assign this Agreement or any rights, duties or obligations arising hereunder shall be void and of no effect.

Section 7. Responsible Principal(s)
(a) CONTRACTOR's Responsible Principal set forth above shall be principally responsible for CONTRACTOR's obligations under this Agreement and shall serve as principal liaison between CITY and CONTRACTOR. Designation of another Responsible Principal by CONTRACTOR shall not be made without prior written consent of CITY. (b) CITY's Responsible Principal shall be the City Manager or his designee set forth above who shall administer the terms of the Agreement on behalf of CITY. 3 Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 23 of 30
B0785-0001\3036554v1.doc
Section 8. Personnel. CONTRACTOR represents that it has, or shall secure at its own expense, all personnel required to perform CONTRACTOR's Scope of Work under this Agreement. All personnel engaged in the work shall be qualified to perform such Scope of Work.

Section 9. Permits and Licenses. CONTRACTOR shall obtain and maintain during the Agreement term all necessary licenses, permits and certificates required by law for the provision of services under this Agreement, including a business license.

Section 10. Interests of CONTRACTOR. CONTRACTOR affirms that it presently has no interest and shall not have any interest, direct or indirect, which would conflict in any manner with the performance of the Scope of Work contemplated by this Agreement. No person having any such interest shall be employed by or be associated with CONTRACTOR.

Section 11. Insurance.
(a) CONTRACTOR shall at all times during the term of this Agreement carry, maintain, and keep in full force and effect, insurance as follows:
(1) A policy or policies of Comprehensive General Liability Insurance, with minimum limits of Two Million Dollars ($2,000,000) for each occurrence, combined single limit, against any personal injury, death, loss or damage resulting from the wrongful or negligent acts by CONTRACTOR.
(2) A policy or policies of Comprehensive Vehicle Liability Insurance covering personal injury and property damage, with minimum limits of One Million Dollars ($1,000,000) per occurrence combined single limit, covering any vehicle utilized by CONTRACTOR in performing the Scope of Work required by this Agreement. (3) Workers' compensation insurance as required by the State of California.
(4) Professional Liability Insurance
D A policy or policies of Professional Liability Insurance (errors and omissions) with minimum limits of One Million Dollars ($1,000,000) per claim and in the aggregate. Any deductibles or self-insured retentions attached to such policy or policies must be declared to and be approved by CITY. Further, CONTRACTOR agrees to maintain in full force and effect such insurance for one year after performance of work under this Agreement is completed.
(b) CONTRACTOR shall require each of its sub-contractors to maintain insurance coverage which meets all of the requirements of this Agreement. (c) The policy or policies required by this Agreement shall be issued by an insurer admitted in the State of California and with a rating of at least a A+;VII in the latest edition of Best's Insurance Guide.
(d) CONTRACTOR agrees that if it does not keep the aforesaid insurance in full force and effect CITY may either immediately terminate this Agreement or, if insurance is available at a reasonable cost, CITY may take out the necessary insurance and pay, at CONTRACTOR's expense, the premium thereon.
4 Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 24 of 30
B0785-0001\3036554v1.doc
(e) At all times during the term of this Agreement, CONTRACTOR shall maintain on file with CITY's Risk Manager a certificate or certificates of insurance on the form set forth in Exhibit C, attached hereto and incorporated herein, showing that the aforesaid policies are in effect in the required amounts. CONTRACTOR shall, prior to commencement of work under this Agreement, file with CITY's Risk Manager such certificate or certificates. The general liability insurance shall contain an endorsement naming the CITY as an additional insured.
(f) The general liability and vehicle liability policies required under this Agreement shall contain an endorsement providing that the policies cannot be canceled or reduced except on thirty (30) days prior written notice to CITY, and specifically stating that the coverage contained in the policies affords insurance pursuant to the terms and conditions as set forth in the Agreement.
(g) The insurance provided by CONTRACTOR shall be primary to any coverage available to CITY. The policies of insurance required by this Agreement shall include provisions for waiver of subrogation.
(h) Any deductibles or self-insured retentions must be declared to and approved by CITY. At the option of CITY, CONTRACTOR shall either reduce or eliminate the deductibles or self-insured retentions with respect to CITY, or CONTRACTOR shall procure a bond guaranteeing payment of losses and expenses.
(i) The insurance coverage amounts required under the Agreement do not limit CITY's right to recover against CONTRACTOR and its insurance carriers.

Section 12. Indemnification.
(a) CONTRACTOR agrees to indemnify, hold harmless and defend CITY, City Council and each member thereof, and every officer, employee and agent of CITY, from any claim, liability or financial loss (including, without limitation, attorney's fees and costs) arising from any intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of CONTRACTOR or any person employed by CONTRACTOR in the performance of this Agreement.
(b) All duties of CONTRACTOR shall survive termination or expiration of the Agreement.

Section 13. Termination.
(a) CITY shall have the right to terminate this Agreement for any reason or for no reason upon five calendar days' written notice to CONTRACTOR. CONTRACTOR agrees to cease all work under this Agreement on or before the effective date of such notice. (b) In the event of termination or cancellation of this Agreement by CITY, due to no fault or failure of performance by CONTRACTOR, CONTRACTOR shall be paid based on the percentage of work satisfactorily performed at the time of termination. In no event shall CONTRACTOR be entitled to receive more than the amount that would be paid to CONTRACTOR for the full performance of the services required by this Agreement.

CONTRACTOR shall have no other claim against CITY by reason of such termination, including any claim for compensation.
5 Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 25 of 30
B0785-0001\3036554v1.doc
Section 14. CITY's Responsibility. CITY shall provide CONTRACTOR with all pertinent data, documents, and other requested information as is available for the proper performance of CONTRACTOR's Scope of Work.

Section 15. Information and Documents. All data, information, documents and drawings prepared for CITY and required to be furnished to CITY in connection with this Agreement shall become the property of CITY, and CITY may use all or any portion of the work submitted by CONTRACTOR and compensated by CITY pursuant to this Agreement as CITY deems appropriate.

Section 16. Records Retention and Examination. CONTRACTOR shall retain, protect, and maintain in an accessible location all records and documents, including paper, electronic, and computer records, with respect to all matters covered under this Agreement for five (5) years after receipt of final payment by CITY under the Agreement. CONTRACTOR shall make all such records and documents available for inspection, copying, or other reproductions, and auditing by authorized representatives of CITY, including the City Manager or designee, free of charge. CONTRACTOR shall make available all requested data and records at reasonable locations within the County of Los Angeles at any time during normal business hours, and as often as CITY deems necessary. If records are not made available within the County of Los Angeles, CONTRACTOR shall pay CITY's travel, hotel and meal costs to the location where the records are maintained. CONTRACTOR must include this provision in all subcontracts made in connection with this Agreement. This provision shall survive the termination of the Agreement.

Section 17. Nondiscrimination by CONTRACTOR. In the performance of this Agreement, CONTRACTOR assures that no person shall, on the basis of race, color, religious creed, sex, gender, gender identity, gender expression, marital status, national origin, ancestry, age, physical disability, mental disability, medical condition, genetic information, sexual orientation or other basis prohibited by law, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under this Agreement or under any project, program or activity supported by the Agreement, as required by Title VI of the Civil Rights Act of 1964, as amended, the Civil Rights Restoration Act of 1987, and Federal Executive Order 12898 (Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations). CONTRACTOR shall not discriminate against any employee, subcontractor, or applicant for employment because of race, color, religious creed, sex, gender, gender identity, gender expression, marital status, national origin, ancestry, age, physical disability, mental disability, medical condition, genetic information, sexual orientation or other basis prohibited by law, and shall take affirmative action to ensure that subcontractors and applicants are employed, and that employees are treated during employment, without regard to their race, color, religious creed, sex, gender, gender identity, gender expression, marital status, national origin, ancestry, age, physical disability, mental disability, medical condition, genetic information or sexual orientation.

Section 18. Notice. Any notices, bills, invoices, etc. required by this Agreement shall be deemed received on (a) the day of delivery if delivered by hand during the receiving party's regular business hours or by facsimile before or during the receiving party's regular business hours; or (b) on the second business day following deposit in the United States mail, postage prepaid to the addresses set forth above, or to such other addresses as the parties may, from time to time, designate in writing pursuant to this section. 6 Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 26 of 30
B0785-0001\3036554v1.doc
Section 19. Attorney's Fees. In the event that either party commences any legal action or proceeding to enforce or interpret the provisions of this Agreement, the prevailing party in such action shall be entitled to reasonable attorney's fees, costs and necessary disbursements, in addition to such other relief as may be sought and awarded.

Section 20. Entire Agreement. This Agreement represents the entire integrated agreement between CITY and CONTRACTOR, and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be amended only by a written instrument signed by both CITY and CONTRACTOR.

Section 21. Exhibits; Precedence. All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any discrepancy between the express or implied subject matters of this Agreement and the provisions of any document incorporated herein by reference, the provisions of this Agreement shall prevail.

Section 22. Governing Law. The interpretation and implementation of this Agreement shall be governed by the domestic law of the State of California.

Section 23. CITY Not Obligated to Third Parties. CITY shall not be obligated or liable under this Agreement to any party other than CONTRACTOR.

Section 24. Severability. Invalidation of any provision contained herein or the application thereof to any person or entity by judgment or court order shall in no way affect any of the other covenants, conditions, restrictions, or provisions hereof, or the application thereof to any other person or entity, and the same shall remain in full force and effect.

EXECUTED the day of 20_, at Beverly Hills,
California.

CITY OF BEVERLY HILLS
A Municipal Corporation
Insert Name of Dept Head/ Dir. of Fin. / CM
Insert Title
CONTRACTOR:

Insert Contractor Name
Insert Title
Insert Contractor Name
Insert Title
APPROVED AS TO CONTENT:
7 Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 27 of 30
B0785-0001\3036554v1.doc
Insert Dept Head Name
Title
Insert Risk Manager Name
Risk Manager
Insert Purchasing Services Manager Name
Purchasing Services Manager
8 Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 28 of 30
B0785-0001\3036554v1.doc

EXHIBIT A

SCOPE OF WORK
I. SCOPE OF WORK
CONTRACTOR shall perform the following services:
[Describe the services in detail. Include schedule for deliverables and/or services. If there is a need for a Project schedule, insert a Project schedule or insert "The City Manager or his designee may establish a project schedule in writing."] II. INFECTIOUS DISEASE
A. CONTRACTOR shall be required to know and adhere to the California Occupational Safety and Health Act of 1973 ("CalOSHA") COVID-19 Prevention NonEmergency Regulations, the California Department of Public Health orders and all state, federal and local regulations regarding COVID-19 and other infectious diseases that may pose a risk to public health.

B. CONTRACTOR shall advise employees who have any symptoms of COVID-19, the common cold, influenza or infectious disease not to report to work.

C. CONTRACTOR shall notify their CITY Responsible Principal and the Risk Manager immediately upon learning that an employee who was working onsite at a CITY facility has been diagnosed with COVID-19 or any infectious disease.

For questions, please contact CITY's Responsible Principal or Risk Management at 310- 285-1073.
9 Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 29 of 30
B0785-0001\3036554v1.doc

EXHIBIT B

SCHEDULE OF PAYMENT AND RATES
(a) Rates/Compensation
(b) CONTRACTOR shall submit to CITY a detailed invoice, on a monthly basis or less frequently, for the services performed pursuant to this Agreement. Each invoice shall itemize the services rendered during the billing period and the amount due. Within 30 days of receipt of each invoice, CITY shall pay all undisputed amounts included on the invoice. CITY shall pay CONTRACTOR said Consideration in accordance with the schedule of payment set forth in this Exhibit.
10 Released: November 15, 2024
Due: 5:00pm, December 18, 2024
City of Beverly Hills – Request for Proposals:

Microtransit Turnkey Services Page 30 of 30
B0785-0001\3036554v1.doc

EXHIBITC

CERTIFICATE OF INSURANCE
This is to certify that the following endorsement is part of the policy(ies) described below:

NAMED INSURED

ADDRESS

COMPANIES AFFORDING COVERAGE
A
B.

C.

COMPANY POLICY EXPIRATION B.I. LIMITS AGGREGATE
(A..B. C) COVERAGE NUMBER DATE P.D.

El\ 0TOMOBILE LIABILITY
EloENERAL LIABILITY
[PRODUCTS/COMPLETED
"
$

OPERATIONS
ElL ANKET CONTRACTUAL
�
ElcONTRACTOR'S PROTECTIVE
ElPERSONAL INJURY
El
[
E
W
x
O
cE
RKE
ss
RS
LI
'
A
C
B
O
I
M
LI
P
T
E
Y

NSATION
4 �
□ A
It is hereby understood and agreed that the City of Beverly Hills, its City Council and each member thereof and every officer and employee of the City shall be named as joint and several assureds with respect to claims arising out of the following project or agreement:

It is further agreed that the following indemnity agreement between the City of Beverly Hills and the named insured is covered under the policy: Contractor agrees to indemnify, hold harmless and defend City, its City Council and each member thereof and every officer and employee of City from any and all liability or financial loss resulting from any suits, claims, losses or actions brought against and from all costs and expenses of litigation brought against City, its City Council and each member thereof and any officer or employee of City which results directly or indirectly from the wrongful or negligent actions of contractor's officers, employees, agents or others employed by Contractor while engaged by Contractor in the (performance of this agreement) construction of this project.

It is further agreed that the inclusion of more than one assured shall not operate to increase the limit of the company's liability and that insurer waives any right of contribution with insurance which may be available to the City of Beverly Hills.

In the event of cancellation or material change in the above coverage, the company will give 30 days written notice of cancellation or material change to the certificate holder.

Except to certify that the policy(ies) described above have the above endorsement attached, this certificate or verification of insurance is not an insurance policy and does not amend, extend or alter the coverage afforded by the policies listed herein.

Notwithstanding any requirement, term, or condition of any contract or other document with respect to which this certificate or verification of insurance may be issued or may pertain, the insurance afforded by the policies described herein is subject to all the terms, exclusions and conditions of such policies.

DATE:

AGENCY:

B0785-0001\1142491 v 15.doc
BY:

TITLE:

ADDRESS:

Authorized Insurance Representative
RMO2.DOC REVISED 10/14/96.

Attachment 3
Key RFP Requirements
Service Parameters:
• Operating hours: 7 days per week, 6:00 AM to 10:00 PM (16-hour service day) • Service area: Entire City of Beverly Hills (5.7 square miles) and identified adjacent destinations
• Booking options: Mobile app, website, and phone/call center Fleet Requirements:
• Zero-emission vehicles
• Capacity: 8-10 passengers per vehicle
• Wheelchair/bike accessible
• Capable of traversing all City streets including hillside areas • Autonomous technology encouraged
Performance Standards:
• Average wait time: ≤15 minutes (≤18 minutes during peak hours) • 90% of pickups within 20 minutes of request
• 98% completion rate for accepted ride requests
• Maximum 2% cancellation rate by service provider
• 90% minimum vehicle availability during service hours • Maximum walking distance: ⅛ mile in commercial areas, ¼ mile in residential areas Technology Platform Requirements:
• Real-time scheduling, dispatch, and reservations
• Flexible pricing models
• Comprehensive data reporting and analytics
• Integration capabilities with regional transit systems Turnkey Service Scope: The RFP required a comprehensive turnkey solution including:
• Complete technology platform (rider app, driver app, dispatch systems) • All operational delivery (vehicles, drivers, dispatchers) • Vehicle maintenance and management
• Driver recruitment, screening, and training
• Customer service and call center support
• Marketing and community engagement
• Data collection, reporting, and performance monitoring Contract Terms:
• Initial term: 2 years
• Optional extensions: Up to 3 additional one-year terms (5 years total maximum) Attachment 4
Circuit Inc.
501 E. Las Olas Blvd
Suite 300
Fort Lauderdale, FL 33301
Re: Protest of Intent to Award – RFP No. 25-350-7 Microtransit Turnkey Services Dear Assistant Director Grilley and Members of the Evaluation Committee:

Circuit respectfully submits this protest regarding the City’s stated intent to award RFP No. 25-350-7 for Microtransit Turnkey Services.

This protest is not based solely on comparative pricing. Rather, it is based on a fundamental procedural concern: the City is proceeding toward award more than one year after proposals were submitted, without requesting updated qualifications, service plans, or pricing.

Given the rapid evolution of the microtransit industry and the City’s reliance on a qualifications-based selection process, proceeding to contract based on December 2024 submissions materially undermines the integrity of the competitive process and creates avoidable risk for the City.

1. The Evaluation Is Based on Stale Proposals
Proposals were due on December 18, 2024. The staff report recommending award is dated January 7, 2026 — more than twelve months later.

Microtransit operations are not static. Over the past year:
● Fleet technology has evolved significantly (including new EV platforms and ADA configurations),
● Software routing and dispatch systems have materially advanced, ● Safety integrations and reporting tools have expanded, ● Insurance, labor, and operating cost structures have shifted, ● Service deployment strategies have improved based on live-market data.

The RFP was evaluated using weighted criteria that emphasized program approach (30%) and technology/fleet (20%). When those elements are central to scoring, evaluating year-old technical submissions without refresh unfairly freezes the competitive field in time.

A best-and-final-offer (BAFO) round would not “re-score” the past. It would ensure the City is awarding a two-year, $3.1 million pilot based on current capabilities, not outdated snapshots. @ Circuit
Many of Circuit’s recent enhancements resulted in Circuit being awarded a contract instead of Via to bring a microtransit pilot to Warner Center in the San Fernando Valley, supported by the Los Angeles County Board of Supervisors and Los Angeles City Councilmembers.

2. Circuit’s Capabilities Have Materially Improved Since Submission
Since December 2024, Circuit has:
● Expanded its Southern California operations footprint, ● Deployed Volkswagen ID. Buzz EV fleets in multiple markets, ● Enhanced ADA and safety monitoring systems,
● Improved launch timelines and deployment processes,
● Refined service optimization strategies based on live operational data.

These advancements were not reflected in the 2024 proposal because they did not yet exist.

Awarding a contract in 2026 without permitting proposers to present current capabilities deprives the City of evaluating the best available version of each vendor.

3. Qualifications-Based Selection Heightens the Need for Updated Review
The City utilized a qualifications-based selection approach, evaluating firms first on experience, technical approach, and operational merit before reviewing cost.

Because cost was not initially scored, the competitive differentiation rests heavily on:
● Demonstrated operational capacity,
● Technology maturity,
● Fleet strategy,
● Familiarity with the service environment,
● References and recent performance.

All of these factors are time-sensitive.
@ Circuit
A vendor’s relative position in late 2024 may not reflect their relative position in early 2026. A brief BAFO process would allow the City to confirm whether the originally identified ranking still reflects current market reality.

4. Public Interest and Fiscal Stewardship Require
Updated Assumptions
The staff report estimates a two-year pilot cost of approximately $3.1 million.

Committing public transit funds based on year-old pricing and deployment assumptions creates several risks:
● Cost structures may no longer reflect market conditions, ● Fleet availability and EV supply chains have changed, ● Insurance and labor costs have shifted,
● Ridership forecasting models have evolved,
● Grant funding landscapes have changed.

A short best-and-final-offer round would protect the City’s fiscal interests by confirming that pricing, service levels, and operational assumptions remain accurate and competitive.

5. Service Levels Remain a Material Value Consideration While cost was not a weighted evaluation criterion, the City’s stated goals emphasize reliability, wait times, and rider satisfaction — all of which are driven by vehicle service hours.

For reference:

Metric Circuit Option 1 Circuit Option 2 Via Proposal
Vehicles 5 4 4
Weekly Vehicle Hours ~511 ~409 ~327
2-Year Cost ~$2.9M ~$2.38M ~$3.1M
@ Circuit
Even under a qualifications-based framework, service capacity directly affects pilot success outcomes. A refreshed comparison using standardized service parameters would allow the City to confirm the optimal balance of supply, reliability, and fiscal stewardship.

Requested Remedy
Circuit respectfully requests that the City:

1. Pause contract execution, and

2. Issue a short Best and Final Offer (BAFO) request to both Circuit and Via, based on clearly defined and uniform service parameters (fleet size, service hours, performance standards, reporting requirements).

This step would:
● Ensure the City is evaluating current capabilities,
● Confirm pricing reflects present-day market conditions, ● Protect the integrity of the competitive process,
● Reduce legal and fiscal risk associated with a delayed award, ● Strengthen public confidence in the procurement outcome.

Circuit remains fully committed to partnering with the City of Beverly Hills and stands ready to submit updated materials immediately upon request.

Thank you for your consideration.

Respectfully,
Daniel Kramer
Vice President, Business Development (West)
Circuit
@ Circuit
¢=
Attachment 5
Proposal for Turnkey
Microtransit Services
City of Beverly Hills Public Works Department
Request for Proposals I No. 25-350-7
January 6, 2025
Submitted by Crosby Street Transit, LLC
(A wholly owned subsidiary of Via Transportation, Inc.) Crosby Street Transit, LLC
(a wholly owned subsidiary of Via Transportation, Inc.) 114 5th Avenue, 17th Floor
New York, NY 10011
Subject: Proposal for Turnkey Microtransit Services
To: City of Beverly Hills Public Works Department
Attn: Martha Eros, Transportation Planner
January 6, 2025
Dear Ms. Eros,
Crosby Street Transit, LLC (“Via”) is delighted to present our proposal to the City of Beverly Hills for the delivery of a turnkey microtransit service. We understand that the City is seeking a forward-thinking partner to enhance local connectivity, with a clearly stated goal to integrate microtransit with the planned expansion of the Metro D Purple Line subway stations. We value and share the City’s commitment to reducing use of single-occupancy vehicles and greenhouse gas emissions. As the world’s leading provider of microtransit and integrated transit solutions and with our deep local commitment to Los Angeles County, Via is uniquely positioned to bring this vision to life.

Our team is excited to partner with Beverly Hills to design and deliver a successful and sustainable microtransit pilot program for the City.

The following proposal is an offer to complete the Scope of Work listed in the RFP. The offer, including the cost proposal and budget, will remain valid for at least 90 business days after the proposal due date. Our legal team has reviewed the contractual and insurance requirements in the City’s standard contract and has assured us that they are generally acceptable. Should our submission be of interest, we would seek a brief discussion to propose options for mutually agreeable revisions to the (i) intellectual property ownership; (ii) indemnification provision(s); and (iii) termination for convenience provisions. Via has no conflicts of interest that would interfere with the performance of this contract, and no subcontractors will be used in the completion of our work.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 2 Docusign Envelope ID: FFA47A5E-1882-42AB-B00F-EE45B34E8E53 vo
We hope this proposal demonstrates our excitement to partner and build a modern, sustainable, and high-quality microtransit service for Beverly Hills. In the pages that follow we have provided a more detailed description of our operational model and service offering.

Sincerely,
_________________________
Binding Signatory: Authorized Contacts:

Alex Lavoie
Manager
Crosby Street Transit, LLC
Chief Operations Officer
Via Transportation, Inc.
114 5th Avenue, 17th Floor
New York, NY 10011
Jack Klempay
Strategy Associate
Via Transportation, Inc.
(888) 501-7511, ext. 4
114 5th Avenue, 17th Floor
New York, NY 10011
[email protected]
Brian Nelson
Partnerships Principal
Via Transportation, Inc.
(818) 620-6996
2707 S Genesee Ave
Los Angeles, CA 90016
[email protected]
Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 3 Docusign Envelope ID: FFA47A5E-1882-42AB-B00F-EE45B34E8E53 Table of Contents
Table of Contents 4

1. Work Proposal 5

1.1 Executive Summary 5

1.2 Experience 9

1.2.1 Public Agency Transportation Experience 10

1.2.2 Community Outreach and Promoting Rider Growth 11

1.3 Staffing 12

1.3.1 Organizational Chart 13

1.3.2 Qualifications of Key Personnel 13

1.3.3 Local Hiring and Employment Plan 17

1.4 Method of Approach 19

1.4.1 Approach to Project Tasks 19

1.4.2 Technical Specifications 29

1.4.3 Equipment & Supplies 36

1.4.4 Autonomous Vehicle Integration 41

1.4.5 Staffing and Support Services 42

1.4.6 Mitigation of Potential Risks and Challenges 46

2. References 49

3. Cost Proposal 52

4. Business License 54

5. Insurance 56
Appendix A: Sample Metric Report 57
Appendix B: Vehicle Maintenance Plan 61
Proprietary and Confidential Information 77
Intellectual Property 78
Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 4

1. Work Proposal

1.1 Executive Summary
Via is delighted to present our proposal to the City of Beverly Hills for the delivery of a turnkey microtransit service. Our turnkey solution includes our end-to-end software platform, planning and mobilization services, driver hiring and training, a call center for multilingual customer service, vehicles and maintenance, marketing and community engagement services, and more. This approach ensures that all aspects of the service are managed seamlessly by Via, with appropriate oversight and participation by Beverly Hills’ stakeholders. With Via as the City’s single point of contact for the delivery of the turnkey pilot, our teams will:

Execute a collaborative service design that directly addresses the City’s goals using proprietary technology and our in-house transit planning team, Via Strategies. Our experts anticipate running a service that meets or exceeds the performance standards described in the RFP.

Manage a seamless launch process leveraging our local experts and existing operational infrastructure across the Los Angeles metropolitan area. Via is prepared to launch the City’s microtransit pilot in as little as 8 weeks.

Supply and grow a fully-electric fleet to support the City’s sustainability goals.

We recommend a fleet consisting of two Volkswagen ID.Buzz electric buses and two Ford E-Transit electric WAVs (wheelchair accessible vehicles).

Offer a high-quality rider experience with intuitive passenger-facing technology and intelligent vehicle routing. Our Rider App has been downloaded by millions of passengers and consistently receives glowing reviews.

Enhance local connectivity with our integrated transit technology, facilitating in-app first- and last-mile connections to transit hubs. Via is the undisputed leader in building microtransit services that connect to fixed route networks.

Develop a recognizable brand that is customized for Beverly Hills, with localized marketing materials and a white-labeled Rider Application. Our marketing team works in a range of languages, including English and Spanish.

Provide end-to-end support resources and innovative features to help transform the City’s microtransit pilot into a sustainable permanent service, including grant support, service planning, AV technology, and more.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 5 t7
#
CT
Below, we have summarized the core components of our offering for the turnkey delivery of the City’s microtransit pilot program.

Experience Providing Turnkey Microtransit Services
Via is the world’s leading provider of on-demand, flexible transportation systems: no other vendor has more experience powering and operating turnkey microtransit services in the United States. Over the past decade we have launched nearly 100 microtransit pilots that have grown into staples of public mobility in the communities that we serve. We are especially proud of our contributions to the growth of microtransit in California, where we operate or provide software for 30 microtransit services and have powered more than 4 million rides to date. For example, we recently launched two microtransit services in Los Angeles County supported by the LA Metro Visionary Seed Fund, including one service in the City of Torrance and another in
West Covina. We were also selected as
the operations partner for LA Metro’s
Metro Micro program, an eight-zone
microtransit service throughout Los
Angeles County. These partnerships,
combined with our services in
communities like San Diego and
Imperial County, make us by far the
largest and most experienced
microtransit operator in Southern
California. Beyond our commitment to
local and regional connectivity, Via has
a significant global footprint, with
offices in New York, San Francisco,
London, Berlin, and Tel Aviv.

A Unified Provider for Software, Operations, and End-to-End Support Services Via is the only vendor offering best-in-class public mobility technology, world-class transit operations, and end-to-end support services in a unified turnkey solution.

Partnering with Via through our turnkey model means Beverly Hills will have a single provider for everything needed to operate, grow, and optimize its microtransit service.

This includes market-leading applications for riders, drivers, and dispatchers; intelligent electric vehicle and driver supply planning; full staffing and management; and unmatched subject matter expertise in areas like service design, marketing, community engagement, Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 6 @
e •
•
LOT
4my
· =a#
$
TCTA
SET bus
MERCED
<" " U " T r
•
•
•
·%,
• "
··
•
• •
• • €.:
•
ma
Google
00 Meta
( ALo ALro
.. <""••-
A,
grants, and more. With a single turnkey provider, the City will benefit from faster troubleshooting and an operator who fully leverages their software platform for the best operational results. This synchronization between operations and technology is critical for success, and has allowed us to consistently deliver the lowest cost per ride among our competition. In situations where Via services were compared head to head with competitors in nearby services, we have consistently delivered a meaningfully lower cost per ride. This can be seen in the data below from case studies in Seattle, WA (in pilots run by King County Metro) and in suburban services outside Phoenix, AZ.

Integrated Transit Capabilities
The City of Beverly Hills’ commitment to building an integrated transit network, as outlined in the Complete Streets Plan, calls for an on-demand microtransit service that complements the existing fixed-route system and aligns with the future expansion of the Metro D (Purple) Line. Leveraging our experience with partners in Los Angeles County and across the state of California — including a recently-announced partnership with LA Metro along with deployments in Torrance and West Covina — Via can deploy adaptable on-demand mobility options that enhance local connectivity, providing residents with seamless access to major transit hubs. Multi-modal trip planning enables riders to understand the best trip options across all transit modes, while intermodal routing facilitates first- and last-mile connections by coordinating the arrival times of microtransit trips to align with the timetables of fixed-route buses. Mode preference will enable the City to control when microtransit and fixed route options are displayed, ensuring that microtransit complements the fixed route network. With these features, Via is uniquely positioned to assist the City in bridging first- and last-mile gaps, offering seamless connections to local transit networks while enhancing mobility within the City.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 7 loo county
METRO
e
a
uvu
+ii@r
80% decrease in cost per ride >53% lower cost per ride
$108.97
tie t st
2022 +
$58.47
$27.00
- Qi RIDE(o RIDE(O
see¥ Gt@see¥
A pre tat by
dt r rte 20
ye ard CM;
f
spare
(With third-party operators)
$68.66
$15.05
- vio
ll

CONNECT
Via's turnkey microtransit service in Miami-Dade seamlessly integrates the County's fixed routes, city trolleys, and on-demand services. This collaboration has led to impressive outcomes: 50% of rides connect to other transit options, passenger wait times have decreased by Sx, and walking distances to transit are 3x shorter than before the rollout of the service.

Holistic Service Design Expertise and Sustainable Funding Support Via Strategies, our dedicated in-house transit planning and consulting practice, will support the success of the pilot by designing, evaluating, and optimizing a microtransit service that realizes the City's forward-thinking vision for urban connectivity while effectively addressing transportation barriers. As a global leader in transit feasibility studies, integrated network design, and electric vehicle service planning, Via Strategies draws on extensive experience in designing and operating advanced mobility solutions across diverse use-cases, geographies, and contexts. As part of our turnkey proposal, Via Strategies will work with the City to track and analyze service data and ensure that the pilot program consistently aligns the City's goals. This data-driven feedback will allow us to make iterative improvements in real-time, adjusting service zones and points of interest (in-zone and out-of-zone) to optimize performance. Furthermore, as the service matures, our Grants and Public Policy team will assist the City in pursuing additional funding at the federal, state, and local levels to ensure the longevity and sustainability of the service.

In October 2019, the City of Cupertino partnered with Via to address rising emissions, increased traffic congestion, and limited alternatives to single-occupancy vehicle travel. After several highly successful years of on-demand service, Cupertino joined forces with the City of Santa Clara to secure an $8.SM state grant to improve regional connectivity and reduce emissions. The expanded service zones enable connections to two key fixed-route transit hubs, operating with a 100% EV fleet.

Local Presence and Commitment to the Region
By partnering with Via, the City of Beverly Hills will benefit from the strength of our local presence and existing operations in Southern California. Over the past year, Via has made significant investments in the operational infrastructure required to support the expansion Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services] 8 of our microtransit services in Los Angeles County, including the development of local business partnerships, driver recruitment channels, vendor relationships, and vehicle depots in Burbank and Compton. We also have significant regulatory and compliance experience with the California Department of Transportation, as demonstrated by the number and variety of services that we operate. To ensure a strong transit program for Beverly Hills, the City's pilot will be fully supported by our West Coast office in San Francisco and more than 150 team members located across the state including several members of our proposed project team who are lifelong residents of Los Angeles. "As a lifelong Angeleno and LMU alum, I am excited about this opportunity to expand public mobility in my community. I'm in the neighborhood every week as part of the Beverly Hills basketball recreation league at Beverly Hills High, and an avid fan of Funke for date nights with my wife;this partnership literally hits home for me!" Brian Nelson, Via Partnerships Lead for Beverly Hills
We hope this proposal demonstrates our excitement to partner and build a modern, sustainable, and high-quality transit service for Beverly Hills. In the pages that follow we have provided a more detailed description of our operational model and service offering.

1.2 Experience
At Via, we power efficient operations and build innovative software that enables our customers to transform their transportation systems into smart, data-driven, technology-enabled networks. Founded in 2012, we provide services across the public mobility spectrum including microtransit, paratransit, multimodal transit network planning, electric vehicle service management, and more. To date, we have deployed transit solutions in partnership with over 750 cities and transit agencies in 40 countries, powering 165 million rides around the world.

In particular, over the past 12 years we have become the undisputed leader in flexible and on-demand transportation systems: no other vendor has more experience delivering turnkey microtransit services in the United States. To date, Via has deployed more than 100 turnkey microtransit services worldwide, with over 1,200 vehicles on average on the roads every day. In California alone, we have delivered nearly 4 million rides and directly Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services] 9 operate or provide software for 30 microtransit services across the state, including all-electric services in communities like Cupertino, Richmond, and Palo Alto.

Today, Via employs many of the
world’s foremost experts on
algorithms, navigation systems,
artificial intelligence, machine
learning, and user experience.

Throughout the duration of our
partnership, the City of Beverly Hills
will have access to support from
Via’s global team, including: over
1,000 full-time employees focused
on operations, partner success, community engagement, and service planning; and over 500 full-time software engineers with deep experience in advanced algorithms, data science, digital mapping, database architecture, and product design.

1.2.1 Public Agency Transportation Experience
The world’s largest and most innovative public agencies (including the San Francisco Municipal Transportation Agency and the Los Angeles Country Metropolitan Transportation Authority) trust Via to transform their microtransit systems because of our technical capabilities, extensive experience, and commitment to collaboration and innovation. No other vendor can match our level of public agency experience, as demonstrated by the following partial list of municipal and transit agency partners:

Trusted by cities and transit agencies large and small
We are excited by the opportunity to continue leveraging this experience to enhance mobility for local residents in Beverly Hills. For more detailed information about our work with public agency partners in California and beyond, please see section 2. References.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 10 TransitTech Deployments
• Software only
• Software & operations I
C-tywry -Lit.go mocwt Drud -Uber -Pantoni -Dwnto Ecole afh. lTrio¢ l Sr de V.a fr% Routing
Cornpyy
a
METRO
EN!
LE
MTS uTA€
DCTA Green Bay
M€1Ro
lAiscounty go
METRO wEEE
Tmnr¥ t TO
f1

MILWAUKEE
COUNTY
n]CtTYOF 4!
lit CUPERTINO ,oaiu
• Irv o

LONE TREE
►� Mobile )M MOBILE 4 Chamber & ALABAMA

1.2.2 Community Outreach and Promoting Rider Growth
Via has more than a decade of experience developing and executing marketing, communications, and community engagement strategies for microtransit pilots. Our in-house microtransit marketing team has leveraged this experience to develop effective programs for growing pilots and shifting riders onto Via-powered transit services, with a particular focus on reaching communities that are typically underserved by transit, including populations with limited English proficiency. Examples of successful strategies in past campaigns include programs for free and discounted rides; partnerships with community organizations; on-the-ground engagement events; and the distribution of targeted outreach materials. For more details on our proposed marketing plan for the City of Beverly Hills, please refer to section 14.1 Approach to Project Tasks. t_ el.
., _
---·-
-
-- .
--�--- ---- ·----- ---. --.
------ ·--
topper
Reserve en vehiculos
ible
va
p
i
ar
'
a
.
sl ace>",plicacion
ruedas en\
.
~e¢ "" ·"gt. Evar',lthing you
ed to know a •
nSiiet con Vat ueu
+g Hopper.
zz.± zrz:.

Students ride
for FREE with
_
Richmond Moves!
.. _ .... ___ --- .. - .. - =.:::=====--
zzz. .
---ww--e ---
Examples of marketing materials from a selection of Via's services in California Chandler
Flex
Chandler Flex in Chandler, Arizona launched in July 2022 as a microtransit service primarily designed for students, providing reliable, efficient transportation to support their needs. Recognizing its potential to serve a wider audience, Via and the City of Chandler expanded marketing efforts to include seniors, commuters, and other community groups. These efforts drove a 31% YoY increase in non-student ridership and transformed the service into a vital transit option for residents accessing public transit stops, shopping centers, and recreational hubs. Since its inception, Chandler Flex has grown into a dynamic and inclusive mobility solution, completing over 85,000 rides to date.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services I 11

1.3 Staffing
Via has assembled a comprehensive project team to design, operate, and optimize the City’s microtransit service, leveraging the team’s local experience in delivering microtransit services across the state of California. Our Project Manager for Beverly Hills, Alex Battisti, is a seasoned member of Via’s Partner Success team who is based in Los Angeles. Alex will be responsible for the overall success of the turnkey service and will serve as the main point of contact between Via and the City throughout the duration of our partnership. He will coordinate the work of our teams of experts in contracting, service launch, daily operations, and technical support, ensuring a seamless implementation and the ongoing optimization of the service:
● Contracting: Our team of contracting experts will work closely with the City to finalize project goals, key performance indicators (KPIs), and the initial service design. Lifelong Angeleno Brian Nelson will be Beverly Hills’ point of contact from the Contracting team, under the leadership of Krista Glotzbach, Via’s Vice President of West Coast Partnerships.
● Launch: Our Launch team will manage the implementation of Via’s turnkey solution, including the hiring of drivers and training of any relevant City personnel.

Alex Neumann will serve as the project’s Launch Manager with Kyle Snyder advising from Launch leadership. Alex will be on-site throughout the implementation phase to ensure a smooth rollout for the service. ● Operations: Our Operations team will be responsible for day-to-day service delivery, including driver recruitment, vehicle supply, and safety. Nancy Liao, an experienced General Manager, will leverage our local expertise and infrastructure from operating services across Southern California to ensure success for Beverly Hills’ day-to-day service delivery, while Director of Operations Emily Shapiro will provide operational oversight and coordinate support from Via’s central teams. ● Partner Success: Partner Success will provide consistent support for the City, orchestrating business review meetings, continuously monitoring service performance, and driving iterative improvements. As Project Manager, Alex Battisti will be responsible for overall success of the service with oversight from Joe Martin, who also lives in Los Angeles and serves as Via’s Director of Partner Success for the West Coast region.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 12 ● Expert Support: In addition to the core project team outlined above, the service will be supported by a number of value-added offerings here at Via, including Via Strategies (our in-house transit planning team), Rider Growth & Marketing, Community Engagement, and Grant Writing.

All members of the core project team for Beverly Hills are based in California and report to Via’s West Coast headquarters in San Francisco. In addition to the personnel identified in this proposal, the City will benefit from the full support of Via’s global resources, including more than 70 employees located in-state and more than 1,500 employees working around the world.

1.3.1 Organizational Chart
Below is an organizational chart outlining the structure of the proposed project team, along with oversight from senior leadership in Via’s Contracting, Launch, Operations, and Partner Success organizations.

1.3.2 Qualifications of Key Personnel
Profiles outlining the qualifications of key personnel assigned to the Beverly Hills pilot are provided below. We would be happy to provide the City with full-length resumes of project personnel upon request.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 13 Beverly Hills Microtransit Service, Via Project Personnel « «E Partner Success Expert Support
E 0 er � 9 o a g
8 0
• >
Krista Glotzbach Kyle Snyder Em• ily Shapiro Joe Martin Dan Berkovits Fred Dintenfass Vice President of Director of Director of Director of Vice President of Strategy Vice President of West Coagt Partnerships Launch Operations Partner Success & Consulting Rider Growth ----
E €$ 0 9 0 8 • �
e
0 Brian Nelson Alex Neumann Nancy Lao Alex Battisti Rachel DiSalvo Yesenia Covarrubias 0 Contracting Lead Launch Lead General Manager Partner Success Manager Grants Lead Community Engagement Lead Alex Battisti

PROJECT MANAGER/PARTNER SUCCESS MANAGER
As a Partner Success Manager, Alex works closely with each partner to ensure their deployment’s success. He is based in Los Angeles and brings extensive experience managing partnerships in and around LA County, including recent launches of microtransit services in communities like Torrance and West Covina, as well as several other deployments throughout the state of California. In addition to his work with Via, Alex is deeply invested in LA’s public spaces, and sits on the Board of Directors of the Los Angeles Forum for Architecture and Urban Design. He holds an MBA from the University of California, Los Angeles.

Joe Martin

DIRECTOR OF PARTNER SUCCESS
Joe oversees Via’s partnerships across the West Coast, collaborating closely with cities and transit agencies to ensure the success of their programs. He has played a key role in the ongoing success of services in communities like Cupertino, Palo Alto, and Richmond. Prior to Via, Joe led partnerships at a medical technology startup, and worked as a consultant at a company that helped clients reach data-driven decisions through in-market experimentation. He holds a BS in Finance and a BA in Mathematics from the University of Virginia. Joe lives in Los Angeles.

Brian Nelson

CONTRACTING LEAD
Part consultant, part project manager, part salesperson, Brian will help Beverly Hills achieve its goals and priorities, and will advise the City on building the most optimal tech-enabled mobility solutions to help solve unique challenges within the local community. Brian supports our partners across Southern California, including in communities such as San Diego, Torrance, and West Covina. He received his BS in Business Management and Marketing from Loyola Marymount University. He is a lifelong resident of Los Angeles County.

Krista Glotzbach

VICE PRESIDENT OF WEST COAST PARTNERSHIPS
Krista Glotzbach will oversee Via’s Partner Success team for Beverly Hills, during implementation and beyond. Krista brings 30 years of experience Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 14 0 to this role, and has been at Via since 2019. Krista oversees all of our Partnerships and Partner Success team members on the West Coast of the United States and has a deep understanding of the needs of our West Coast partners in Southern California and beyond. Krista is based in California and is the most senior member of our West Coast team. She holds an MBA from Harvard University.

Alex Neumann

LAUNCH LEAD
Alex will directly manage the launch of the City’s microtransit service, including the implementation of Via software and the training of any City staff. Based in California, Alex works with public transit agencies and private operators to launch new services across Via’s entire product suite.

He has helped partners launch services in on-demand, pre booking microtransit, and paratransit. He also has specific expertise launching services with third-party product integrations (including AV deployments) and setting up operations for first mile/last mile services. Alex holds a BA in Political Science from Northwestern University.

Kyle Snyder

DIRECTOR OF LAUNCH
Kyle will support Alex and the launch team through the transition and implementation of Via’s software and microtransit service, leveraging his experience in transitioning, launching, and operating transit services across the country. Kyle has over 10 years experience as a project manager and engineer in transportation. Today, Kyle leads our launch team, launching 20 services for Via. He holds an MBA from the Kellogg School of Management (Northwestern University), and a BS in Civil Engineering from Clarkson University.

Nancy Liao

GENERAL MANAGER
As General Manager, Nancy leads operations, strategy, and community engagement for Via in Richmond, West Sacramento, and Calexico, along with corporate deployments at LinkedIn and Meta. She has grown ridership in each market, improved both rider and driver satisfaction, and built strong relationships with local leaders to drive expansion of these services. Prior to Via, Nancy worked in Strategy & Operations at Lime Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 15 0 %e
delivering micromobility services to city governments, and as a management consultant at Bain & Company. Nancy holds an MBA from Stanford University and a BS in Business Administration from the University of California, Berkeley.

Emily Shapiro

DIRECTOR OF OPERATIONS
Emily will act as a senior operations advisor for the City, ensuring operational success through support, oversight, and management of our various operations teams. As Via’s Director of Operations, Emily oversees service operations for our partners in the Western US, ensuring service continuity and ongoing operational excellence. Prior to Via, she led the US strategy for a sales technology project implemented with Anheuser Busch’s distribution network. She holds a BS in Systems Engineering from Washington University in St. Louis.

Dan Berkovits

VICE PRESIDENT OF STRATEGY & CONSULTING
Dan leads Via Strategies, Via’s dedicated transit consulting team. His team will advise and guide the City as service needs evolve. Dan brings extensive experience working in and for the public sector to solve complex challenges related to new infrastructure. Prior to joining Via, Dan managed a variety of interdisciplinary consulting engagements for public and private-sector clients at AECOM; led an award-winning, participatory long-term recovery and resiliency program to address the impacts of Hurricane Sandy; and worked as a land-use lawyer. He holds a JD and a MUP from Harvard University.

Fred Dintenfass

VICE PRESIDENT OF MARKETING & RIDER GROWTH
Fred and his team lead marketing initiatives to drive ridership. They will focus on the full funnel, from raising awareness to rider retention, replicating the success we have seen in services from Jersey City, NJ to Cupertino, CA. Prior to Via, Fred led marketing for New Products and Ventures at The New York Times. During his tenure, subscriptions from the Crossword and Cooking apps became a key part of the company's growth strategy. He also founded his own digital agency, Think Barrel, and worked at Isobar, a global marketing consultancy. Clients at Isobar Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 16 included Sotheby's, Avis Budget Group, and General Motors.

Yesenia Covarrubias

COMMUNITY ENGAGEMENT LEAD
Yesenia will work with the City to develop a custom community engagement and outreach strategy to align Via’s service with the priorities of the community. She specializes in outreach to riders who live with disabilities, lack bank accounts or smartphones, or have limited English proficiency. Prior to this role, Yesenia worked within the Community offices for organizations such as St. Jude Children's Research Hospital - ALSAC, the New York Mets, the United States Olympic Committee, and Major League Soccer. Yesenia holds a degree in Sports Marketing from California State University, Fresno.

Rachel DiSalvo

GRANTS LEAD
Rachel will partner with the City to sustain the services by identifying and securing additional grant opportunities at the local, state, and federal levels. Rachel has helped to secure grant funding for Via’s partners across the United States, including funding to support the electrification of services in Cupertino and Richmond, CA. Prior to Via, Rachel worked in the non-profit space to secure grants for organizations such as The Door and University Settlement Society of New York. Rachel holds a Bachelor’s degree from Colgate University, and Master’s degrees from Columbia University, and the London School of Economics and Political Science.

1.3.3 Local Hiring and Employment Plan
Via combines the resources of a global company with a highly localized approach to deliver turnkey microtransit services in the wide range of communities we serve. Alex Battisti, Beverly Hills’ designated Project Manager, lives in Los Angeles and will be the main point of contract for the City throughout the duration of our partnership. Nancy Liao, Via’s General Manager for services in Southern California, will leverage support from Via’s central teams and conduct frequent site visits to ensure the smooth running of the microtransit program. She will also be responsible for the hiring and oversight of Via’s employee drivers. Below, we have outlined the organizational structure of this local team.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 17 Driver Recruitment and Qualifications
Beverly Hills’ microtransit service will be operated by an engaged, qualified, and reliable pool of employee drivers. Our driver recruitment program will prioritize the hiring of drivers from the local community, offering competitive wages, benefits, and training to create stable employment opportunities. For the City’s microtransit service, we anticipate hiring 12-14 highly qualified drivers with an average pay of $24 per hour, with a complete benefits package. Via’s Driver Operations team has been highly successful in recruiting and retaining pools of qualified drivers in a range of markets across the United States, including Southern California and the Los Angeles metropolitan area.

Drivers for the City of Beverly Hills will hold all required licenses and certifications, including a valid California drivers license, and will receive in-depth training on passenger assistance, sensitivity, and defensive driving, among other topics. Via partners with nationally-recognized organizations to provide the highest possible quality of driver training, including the National Safety Council (NSC), Driverge, and the Community Transportation Association of America (CTAA). For more details on our driver training program, please see section 1.4.5 Staffing and Support Services.

Dynamic Shift Scheduling
As an operator, Via takes a fundamentally different approach than our competitors. We leverage innovative technology and robust data to inform, power, and optimize all aspects of our operations, including shift scheduling. While other providers rely on long, 8-10 hour Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 18 �
Alex Battisti
Project Manager
ti Nancy Liao
General Manager
' '
Employee Drivers
Support and
Dispatch Agents
'------ '--
Support from
Central Teams
Driver
Acquisition
Vehicle
Sourcing
Data
Science
Trust and
Safety
driver shifts and fixed driver
schedules, Via’s driver model is built
to match driver availability to
dynamic rider demand. Our shift
optimization tools leverage machine
learning to forecast demand and
generate hour-by-hour daily plans for
required driver supply and
associated driver shifts, while
considering any labor restrictions and local regulatory requirements. We offer updated shift options each week, and drivers are able to choose short driving slots or irregular hours to ensure we’re best matching rider demand. Our ability to adjust these driving slots in response to changing demand patterns — whether weekly or even daily — is a key factor that sets our model apart from other providers. This highly efficient supply plan results in fewer driver hours and lower costs per trip.

1.4 Method of Approach
Via is proposing a turnkey solution for the delivery of the City of Beverly Hills’ microtransit pilot, which includes our end-to-end software platform, full operational delivery, and expert support services from the global Via team. This approach ensures that all aspects of the service — from technology implementation to daily operations — are managed seamlessly by Via, allowing the City and their riders to benefit from an integrated, end-to-end solution. In this section, we provide a narrative detailing our proposed approach to ensure the timely delivery of the service, including plans to complete each task outlined in the Scope of Work; a high-level overview of our technology platform; operational plans for vehicle supply, staffing, and support services; and our approach to mitigating potential risks of challenges that could arise over the course of this project.

1.4.1 Approach to Project Tasks
Task 1: Project Management
From implementing complex transit services with hundreds of partners globally, Via understands that exceptional project management is key to the success of any deployment. Via takes an agile approach to both product development and project governance; we rapidly test and iterate ideas, communicate frequently with our partners, and quickly incorporate feedback without causing delays later in the process. Through Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 19 Traditional
Transit
Via's operating mode (L ) ensures sophisticated supply and demand matching, delivering superior cost efficiency compared to models with flat driver hours ( R J
Driver hours Rides
productive partner communication and nimble project management, our team meets deliverables with agreed-upon timelines while maintaining the flexibility to course-correct as necessary.

Throughout our partnership with the City of Beverly Hills, Via will provide comprehensive support, including 24/7 technical assistance and guidance from the Via project team. We will manage all aspects of the service required for a
successful microtransit launch and operation, such as
workflow management, fleet provision, customer support, and safety planning. After launch, we will continuously refine the solution based on performance data and rider feedback. As outlined in section 1.3 Staffing, Alex Battisti (left) will serve as the designated Project Manager for the City and Nancy Liao (right) will lead the Operations Team.

Together, they will be available to answer any questions by phone and/or email during normal work hours.

Via's project management approach includes the following key elements:
● Transparent stakeholder communication: Alex will schedule and facilitate regular Project Development Team meetings, including an initial kick-off meeting, weekly check-ins, and quarterly business reviews. Quarterly business reviews will be held in Beverly Hills — both Alex and Nancy, as well as other members of Via’s leadership team, will be on-site to present updates in-person. Alex will be responsible for preparing all agendas, minutes, and sign-in sheets for these meetings. The City Project Manager will be informed prior to any meeting with an outside agency or organization.
● Seamless and expedited launch process: With the support of the Via project team, Alex will produce a detailed Work Plan during the mobilization period and will meet regularly with key stakeholders during the implementation phase to ensure the timely delivery of the City’s pilot service. This includes coordinating with the City Project Manager to ensure alignment on major project milestones and deadlines, and to secure approval for any changes to the service. ● Coordination of project resources: Alex and Nancy will coordinate project resources and tasks according to the Work Plan to minimize implementation time and cost, while addressing resource constraints such as City staff availability. This Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 20 includes coordination of all required deliverables, including service launch, driver recruitment, vehicle acquisition, software and hardware installation, branding and marketing, performance monitoring, and planning for future service expansions.

Alex will also be the main point of contact for technical support, working with Via's technical teams to answer the City's questions or address issues as necessary. • Invoicing and documentation: Alex will submit monthly invoices to the City Project Manager, detailing services rendered during the period of the invoice. These invoices will include supporting documentation, and Alex will provide additional details upon request to substantiate expenses.

I•
In 2024, Via's project teams launched an average of 3 to 4 new services every week.

Task 2: Service Planning & Parameters
Via's proposed service design for the City of Beverly Hills features on-demand service across a 5.7 square mile zone covering the entire city, with service running every day from 6:00 am to 10:00 pm. To enable more efficient routing and lower trip times, we recommend for the pilot to be operated as a corner-to-comer service, where riders will be asked to walk a block or two to
reach their pickup or drop-off point. We
can also direct riders to existing transit
stops to take advantage of shelters and
other infrastructure, such as the
planned Purple Line subway stations
along Wilshire Boulevard. To ensure
accessibility, seniors and riders with
disabilities will automatically receive
curb-to-curb service, in which riders
are picked up and dropped off directly
at their requested locations.

Via also has experience leveraging our turnkey model to service regularly occurring special events. With our software, new service zones and/or additional operating hours can easily be configured and launched to accommodate unique rider behavior during festivals, sporting events, and celebrations. For example, we partnered with the City of Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services ] 21 Birmingham, Alabama to leverage our existing Birmingham On-Demand service to support the Birmingham World Games, a large-scale international sporting event lasting more than a week. We also leveraged our Breeze On-Demand service in Sarasota County, Florida to assist hurricane response and recovery efforts across the County.

Via Strategies, our in-house transit planning and consulting team, has conducted a preliminary analysis of service parameters based on the Beverly Hills geographic area, the City of Beverly Hills Complete Streets Plan, and local demographic data using our Remix On-demand Planning tool. Based on this analysis, we anticipate operating a high-performing service for Beverly Hills with the following characteristics:

Estimated Performance With Via
Daily Demand
Expected Ridership
~200
Avg. Wait Time
Request time vs. pickup time
15 min
Max. Walk Distance
Walk time to pickup and drop off locations
< ⅛ mi (commercial)
< ¼ mi (residential)
Fleet Size
# of active vehicles
Weekdays: 4
Weekends: 3
Service Hours
Hours of operation
6 am - 10 pm, every day
Peak: 7 - 9 am and 4 - 7 pm, weekdays
Via employs an iterative, feedback-based process to ensure that each service is designed around the unique needs of our partners, coordinating closely with stakeholders throughout the planning and implementation phases. In our transit planning studies, we conduct robust analyses of the existing service area, local demographic information, and direct community input to advise partners on the optimal parameters for their desired services. This includes designing customized solutions for service areas, fleet size, routing, and scheduling. Our in-house consultants, transit planners, and operations specialists leverage Remix On-demand Planning — our proprietary simulation and planning tool — to explore how services would operate in real-world conditions, including specific field assessments for safety, ADA access, and pedestrian amenities. By doing so, we ensure that our approach supports Beverly Hills’ service goals, from integrating Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 22 updates across the dispatch platform and enhancing communication channels for riders and drivers, to coordinating vehicle fleet expansion and future service needs.

Task 3: Deployment Plan and Operations
To implement Beverly Hills' microtransit pilot, we recommend a8-week launch timeline to meet the City's desired launch date of April 1, 2025. However, we remain flexible and can expand or contract this timeline depending on the City's requirements and availability.

Upon contract signing, Via will promptly begin recruiting, vetting, and training drivers, as well as sourcing the necessary vehicles for service. Leveraging our experience in launching turnkey microtransit services around the globe, we are confident in our ability to assemble and prepare the team well ahead of the desired launch date, allowing ample time for promotional events and marketing; the refinement of key performance indicators (KPIs) and administrative procedures; and dry-run testing.

Throughout the launch process, we will collaborate closely with the City to incorporate stakeholder and community feedback. If any service adjustments are proposed, we will promptly submit an updated deployment plan for the City's review and approval. Our Launch team, led by our Launch Lead Alex Neumann, will be on-site in Beverly Hills to ensure the smooth implementation of the service. Below, we outline our overall approach to launching the City's service and are available to discuss and refine this plan as needed. -
- -
-
-
Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services I 23 Step Core Activities City Activities Via Activities
-
-
-
I
I
I
I
I
+
I
I
I
I -
r
-
-
A
-
-
Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services I 24 Step Core Activities City Activities Via Activities
I
I
I
I
+
I
I -
I
I
I
I
I
I
-
•
-
A
-
-
Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services I 25 Task 4: Marketing and Outreach
Via has more than a decade of experience
successfully marketing microtransit and
growing ridership on behalf of our partners.

Our marketing strategy will focus on
increasing community awareness of the
program in a manner that is sensitive to
local context and the various communities
residing within the City. We recommend
using a mix of channels and continuously
reviewing and optimizing the growth plan
based on those channels that prove to be
most effective. Our teams will also ensure
that community members with the highest
barriers to entry — including those without
smartphones, non-English speakers, riders
with disabilities, and senior citizens — are
ready to ride when the service launches.

As part of our marketing strategy, we will:
● Build a bespoke brand for the Beverly Hills microtransit service including custom logos and vehicle wraps, a white-labelled Rider Application, and a marketing campaign that is tailored to the specific needs of the City. ● Develop materials that engage and educate new riders including pamphlets, mailers, videos, and physical or digital advertisements. Using in-app tools such as promo codes, referral campaigns, and direct rider communications will encourage regular use of the City’s service.
● Conduct high-touch, individualized outreach for hard-to-reach groups like zero-car households, non-English speakers, persons without internet access, senior citizens, and persons with disabilities. Our accessible materials, including pamphlets, flyers, how-to-ride videos, and digital advertising materials can be prepared in English, Spanish, and any other languages that the City requires. ● Engage local businesses whose customers and employees are potential users of the City’s pilot service. For example, we can develop partnerships with major employers to encourage the use of microtransit by commuters.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 26 (hopper
Headed to work,
school, or shopping?
Let Silicon Valley
Hopper get you there!
• Hold in-person and virtual information sessions with community stakeholders to describe how the service will work. These information sessions can be hosted in partnership with community organizations, like libraries and senior centers, or in proximity to local transit hubs. Our community engagement team has identified candidate sites for in-person information centers at the Beverly Hill Public Library, the Roxbury Park Community Center, and the La Cienega Community Center. We can also send street teams to engage commuters near major transportation hubs. • Craft and execute customized surveys to monitor passenger trends and feedback throughout the service area. Via's Rider Growth team has extensive experience assisting partners in data collection efforts, including surveys, on-board feedback, and in-app push questions.
a.577
Flex
In the Detroit suburb of Dearborn, Ml, our SMART Flex service deployed the use of on-the-ground street teams at transit hubs and local events to connect with commuters and explain the benefits of the service. Ridership in these areas increased by double-digit percentages within three months.

Task 5: Data Collection, Visualization, and Ownership
Via understands the value of data and analytics to our partners. Our world-class data science team has developed sophisticated tools to optimize the performance of our deployments and to help inform our partners' future transportation decisions. As described in section 14.2 Technical Specifications, the City of Beverly Hills will have 24/7 access to dashboards with daily, weekly, monthly, quarterly, and yearly views of key performance indicators as well as self-service tools to aggregate, filter, and download data in various formats. The City of Beverly Hills will have full access to its service data both during and after the conclusion of our partnership.

As a complement to these self-service tools, Beverly Hills will also receive regular reports and assistance in data analysis from Alex Battisti, the City's designated Project Manager.

Alex is an expert user of Via's backend systems and will be the key point of contact for all the City's data and reporting needs. In addition to presenting historical data at quarterly business review meetings, Alex will develop customized reports and dashboards to support investigations into topics of special interest and at the City's request. He will also be a resource in training City staff in the effective use of Via's dashboards and self-service tools.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services I 27 Via’s reporting capabilities cover all the operational records and statistical data requested by the City, including but not limited to the following:

Description of Data Request Self-Service Via Project Manager Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 28 ■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
To better illustrate the scope of Via’s reporting and data-generating capabilities, we have attached a Sample Metric Report from a comparable microtransit service in Appendix A.

This summary of service-level metrics is just one of the reports that the City will be able to access with Via’s turnkey microtransit solution, in addition to the raw underlying data as described in section 1.4.2 Technical Specifications.

1.4.2 Technical Specifications
By partnering with Via, the City of Beverly Hills and its riders will benefit from the combined power of our market-leading transit software and our tech-enabled operational approach. As global operators with extensive experience delivering microtransit service on our platform, we have prioritized the development of features that directly address the day-to-day needs of delivering microtransit service, offering unparalleled efficiency, an exceptional rider experience, and high quality of service. The Via platform consists of three main components:
● Rider Application: Via will provide the City of Beverly Hills with a white-labeled Rider Application, which will be both iOS and Android compatible. Our Rider Application provides riders with an all-in-one location for booking, tracking, and Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 29 ■
■
■
■
■
■
■
■
■
■
■
■
canceling rides, providing feedback, and contacting support in real-time. The application also offers configurable rider communications to ensure transparency through events such as service changes, expansions, or disruptions. Via’s Rider Application has been downloaded by millions of passengers and consistently receives glowing reviews.
● Driver Application: Our driver-facing application has been developed to make drivers' jobs safer and easier, enabling them to deliver an exceptional rider experience. For more details on these safety and productivity-enhancing features, please refer to section 1.4.3 Equipment & Supplies.
● Via Operations Center: The Via Operations Center (VOC) is the central application that our local team will use to manage every aspect of the City’s service. The VOC allows our operators to optimize service performance and maximize cost efficiency through sophisticated automations and robust data reporting (described in more detail below). The VOC also preserves significant flexibility to allow Via operators to manually respond to complex service incidents in real-time when needed, ensuring ongoing oversight, strong customer support, and a consistently high quality of service for riders.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 30 Driver App
t om
Hi we're Sa.icon
Valley lopper
(hopper
•
• •
•
Rider App
G Ride Plan
0 -· a ·-
..
•
« .be 0. •• .. . . .. .. . Unassigned (4)
A
' • • • .0
• •
4 4 ..
6 Dispatch, Operations,
4 ' .
• • • and Reporting Platform 0
$
• •
•
b
• •
platform to best meet the City's
service goals and objectives.

Key Performance Indicators for a selection of Via's
turnkey microtransit services in California
Algorithms to Maximize Service Quality and Efficiency
All components of the Via software suite are powered by ViaAlgo, our proprietary routing, aggregation, dispatch, and demand prediction algorithms. These algorithms are the foundation of our platform, achieving the lowest cost per ride in the industry while maintaining a high-quality customer experience. With machine learning and artificial intelligence, our algorithms
become smarter over time,
continuously optimizing pickups,
drop-offs, and routing while
dynamically updating riders,
drivers, and administrators with
real-time information. These
algorithms are configurable and
can be adjusted to accommodate
a diverse and nuanced set of local
needs, ensuring that we can
optimize the use of our technology
Automated Scheduling, Dispatch, and Reservations
As described above, the Via platform supports fully
automated scheduling, dispatch, and reservations, allowing passengers to book trips in real-time via phone, mobile application, and/or web browser. Once a rider has selected their pick-up and drop-off locations, the Via algorithm matches the requested ride with available seats across the fleet, assigning the rider to a vehicle for a convenient personal trip that also optimizes for efficiency across the entire service. This guarantees reliable service, including high rates of on-time performance and customer satisfaction.

For microtransit services like the one envisioned for Beverly Hills, Via's Service Design team recommends a fully
on-demand service, without prescheduled rides. For more details on our analysis of the proposed service design, please see section 141 Approach to Project Tasks.
a
.. _ .... _
9 �
!
i
Geed.hi
Where would you like to 9oT
Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services] 3T Flexible Pricing Models
Riders can pay for their trips directly through the Rider App or over the phone using a variety of payment methods, including digital transit passes, credit or debit cards, subscription passes, cash cards, or vouchers. We support a range of pricing models and fare structures, which can be further tailored to meet the City’s unique service goals and objectives. Possible configurations include the following:
● Discounted Fares: Via can charge different fares for individuals eligible for customer-specific discounts, such as students, seniors, and riders with disabilities, based on their rider profiles. We are also able to offer discounted rates for additional passengers.
● Fares by Journey Path: Via can assess fare structures that incentivize riders to use existing fixed route services where available. In one of our deployments, for instance, a Via partner offers rides for $2.50 for most journeys, but $5 for any rides that replicate existing bus service, as determined by origin and destination. ● Fares by Origin or Destination: Via’s technology can designate focal points, such as business or transit hubs, as eligible for reduced fares, either permanently or during specific time windows. This means that Beverly Hills could charge a different fare for trips to/from transit hubs versus general trips. ● Distance, Time, and Location: Via can configure the service to charge different fares based on distance, time of ride, or location, helping to increase cost efficiency for the City.

Our Service Design and Rider Growth teams look forward to working with the City to determine the optimal fare structure to meet the City’s service goals and objectives.

Promotional Pricing
The Via Platform supports a full range of promotional pricing options, including free rides, promo codes, and vouchers. Examples of promotional pricing that we have successfully deployed in other services include the following:
● Promo Codes: Via’s system accepts promotional codes which can be distributed on any basis desired by the City. Riders enter the code to receive ride credit, which can be used to book rides. We recommend launching the service with promotional fares during the first month to grow ridership (e.g., first 3 trips free).

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 32 ● Transfer Discounts/Vouchers: Via can configure vouchers to be used in the service to accommodate multi-ride passes and transfer discounts, supporting the integration of the service within the broader transit network.
● Fare Passes: We can also work with the City to define various levels of subscription-style passes. For example, riders could purchase a weekly pass for a flat fee, allowing them to ride up to 4 times per day at no additional cost. Riders can also purchase “packages” of ride credit at a discounted rate.

Requesting Accessible Vehicles
Riders are able to request wheelchair-accessible vehicles or vehicles with bike racks using the Rider App or over the phone. Via’s system logs unique rider preferences and automatically personalizes the trip experience based on these needs. After riders create a Via account, our system populates a Rider Profile that tracks customized rider needs, such as:
● The need for a wheelchair accessible vehicle (WAV)
● If the rider travels with a care attendant or service animal ● Whether the customer is visually- or hearing-impaired ● Contact information of a family member or care attendant in case of emergencies ● Option for curb-to-curb service for seniors and riders with disabilities The data stored about each rider influences the decisions made by our routing and scheduling algorithms. For example, once a rider logs their need for wheelchair accessibility, our system will automatically dispatch a wheelchair accessible vehicle (WAV) for all future trips. For riders traveling with a care attendant, our system will account for the additional space requirement and dispatch a vehicle with the appropriate capacity. Further, our system sends rider-specific notes to the assigned driver (e.g., instructions to speak clearly for hearing-impaired riders), and for riders in wheelchairs and those who have requested walking/boarding assistance, our algorithms build in extra time for these pickups and drop-offs — allowing for sufficient boarding time without compromising overall system efficiency.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 33 - --
Sare the Silicon
Valley Hopper love!
640
0rte
- -----
Via has a proven track record of both caring deeply about riders requiring accessible transit and delivering innovative advancements to the paratransit space. We operate paratransit and paratransit overflow services for large agencies like Trinity Metro in Texas, as well as core paratransit fleets for smaller agencies like Capital Area Transit System in Louisiana and Green Bay Metro in Wisconsin.

Additionally, our Rider Application has been designed with accessibility at the forefront and includes features for those in need of visual, audio, cognitive, or mobility accommodations. This also includes Voice Over and Talkback, screen readers for iOS and Android devices respectively, adaptive font sizes and contrast, and switch control. Via relies on broadly-adopted, recognized accessibility standards such as compliance with the Web Content Accessibility Guidelines (WCAG) at the 2.0 AA level, as well as the American with Disabilities Act (ADA) - to ensure all riders can easily digest and engage with all service communication.

Enhancing Connections to Other Mode Choices
Via's Integrated Transit features will enable seamless connections with other mode choices, such as biking, walking, or taking existing fixed-route transit (including the Purple Line extension anticipated in late 2025). Within the Rider Application and web portal, riders are able to view all available public transit options for their requested trip, including stop-by-stop fixed route information, and book trips that span microtransit, fixed route, or a combination of both. Mode Preference logic also allows the City to control when microtransit and fixed route options are displayed, ensuring that microtransit acts as a complement to the existing fixed route network.
. ..
•
Mode Preference
-
%..9
o0MM
•
-- -
j 06 0 ---4 -- 1---
$-
-
__ .., __
-- I -. - ...
4 .. •
-- or
I
sot 0 6
I . ---- .
de
ooe ..
er
·- 1 ·--
' - -- oooe ·••
- - •--·-
.. -%.
.- ..,_,_
Multimodal Intermodal Fixed Route Schedules
•
•
Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services] 34 Via's platform is designed for a high level of integration; our modular and open architecture is purpose-built for ease of integration with other platforms using our proven APIs. This system architecture reflects our mission, which is to help our partners manage all transportation modes within a single holistic platform. For example, we support integrations with third-party fare collection systems, allowing riders to pay for Via trips using the same payment method they use for other public transit modes.

Access to Ridership and Performance Data
Through the Via Operations Center, the City of Beverly Hills will have 24/7 access to daily, weekly, monthly, quarterly, and yearly views of key performance indicators as well as the ability to aggregate, filter, and download data in various formats. Regulatory reports can be automated to present the required service data in the format requested by regulatory and grant-making agencies, including the FTA. Below we provide a high-level overview of these self-service tools.

Service KPI Dashboards
These dashboards function as the central view for service analysis and management.

Through this interface, our partners can organize and visualize the thousands of data points our system collects every minute based on their unique needs and concerns, and leverage our filtering and grouping
tools to generate reports that range
from simple to highly complex. These
reports ensure that partners
understand core service indicators,
such as total ridership and on-time
performance, and can make
data-driven changes to service
parameters such as maximum wait
time, fleet size, and/or vehicle supply
throughout the day.

Data Generator
The Data Generator provides more than a dozen raw data tables that will enable the City to conduct original, granular performance analyses. Staff will be able to organize tables for a detailed view of rider and/or driver activity, passenger feedback, trip cost, vehicle Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 35 .
------- ---
..4. 1.n.1. .
- - - -- - 1.h, .u.t.A
- •· .
information, and more, and pull data for any time period. Further, staff can easily download the data in a range of formats (including CSV, excel, and shapefiles for ArcGIS) and export it to their preferred data analysis software, allowing them to conduct analyses and create reports that incorporate additional datasets to investigate questions of specific interest. This will enable the City to gain an in-depth understanding of the impact of the service on broader trends, such as access to transportation hubs or reduction in the use of single occupancy vehicles.

Compliance Reporting
As a contractor to many recipients and subrecipients of federal and state funding, Via understands the importance and considerable effort involved in reporting for compliance purposes. To address these challenges, we offer pre-built dashboards that contain all the data fields that may require reporting over the course of the year (e.g., total hours, total miles, revenue hours, revenue miles, deadhead miles, unlinked passenger trips, passenger miles traveled, and average passenger trip length). With this information, our system automatically populates reports with the required service-related data on a monthly and/or annual basis, providing a complete package that can be shared directly with grant-making and regulatory agencies.

1.4.3 Equipment & Supplies
Via’s turnkey model includes all the tools, materials, and equipment to perform the tasks outlined in the Scope of Work. In this section, we outline our proposal for an all-electric fleet for the City of Beverly Hills, as well as our general approach to vehicle acquisition and maintenance.

Proposed Fleet for the City of Beverly Hills
To support the City’s service and sustainability goals, Via recommends a four-vehicle fleet consisting of two Volkswagen ID.Buzz electric buses and two Ford E-Transit electric WAVs (wheelchair accessible vehicles). A spare vehicle will be provided to guarantee a consistently reliable service. This fleet composition ensures our ability to effectively serve the general population, as well as elderly riders and riders with limited mobility. Please see below for detailed descriptions of our proposed zero-emissions vehicles:

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 36 Volkswagen ID.Buzz Electric Bus Ford E Transit Electric WAV • 234 miles per charge under typical
operating conditions
Range
• 159 miles per charge under typical
operating conditions
Seating and Accessibility Features
• Seating for 8-10 passengers, including one
wheelchair position with fold-away seats
• Rear-entry, non-slip ramp with a low
incline for wheelchair access
• Wheelchair securement options with
Q'Straint or Sure-Lok systems
Convenience and Comfort Features
• Seating for up to 7 passengers, with
comfortable seating configurations to
accommodate passengers and cargo.
• Ample legroom and headroom ensures
passenger comfort on longer trips.
• Multiple USB ports for passenger
convenience
• Automatic climate control
• Power sliding doors for easy entry and exit
• Comfortable cloth upholstery with
power-adjustable front seats
• Automatic climate control
• Power sliding doors for easy entry and exit
• Comfortable cloth upholstery with
power-adjustable front seats
Each vehicle in the City's fleet will be equipped with bike racks, security cameras, GPS tracking, and a computer tablet pre-loaded with Via's Driver App to track all routes and communicate instructions to drivers during active service. Our vehicle plan is fully flexible and we look forward to collaborating with the City to finalize the seating configurations and the composition of the proposed fleet. We also have extensive experience designing and operating services with autonomous vehicle (AV) technology, as described in section

14.4 Autonomous Vehicle Integration.

Brand, Logo, and Vehicle Wrapping
All vehicles in the proposed fleet will be custom-wrapped with uniform branding. For illustrative purposes, an example of vehicle branding for Beverly Hills is included below.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services] 37 Via’s Marketing team will refine this design in consultation with the City such that all vehicles are easily identifiable, appealing, and conform with the City’s approved branding guidelines.

As described in section 1.4.1 Approach to Project Tasks, Via’s Marketing and Rider Growth teams have extensive experience conducting outreach campaigns and building ridership among multilingual users and other transportation-disadvantaged groups. We look forward to working closely with the City to develop a brand and microtransit program that effectively serves these communities.

Driver/Operator User Interface
Our driver/operator user interface, the Driver App, has been developed to make drivers' jobs safer and easier,
enabling them to deliver an exceptional rider
experience. The application provides a single interface where a driver can access everything they need
before, during, and after their shifts. This includes
turn-by-turn navigation (including list, map, and voice instructions), a ride manifest that updates in real-time as new rides are booked, automated notifications, and
one-click task acknowledgements. Via’s Driver App
offers several opportunities for customization,
including fully configurable requirements for driver
wait times at pickup stops. The Driver App ensures
operational transparency by tracking real-time vehicle
location, and driver safety through features like the
“Silent Alarm”, which automatically alerts dispatchers if drivers are in need of assistance.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 38 442
A 300 m
w 153rd St Broadway
- -
\
•
\
07EE 12 min
W153rd St b/w Broadway Ave
SW Comer, Near Houston Deli Cafe
Vehicle Acquisition and Supply
Leveraging our existing vehicle acquisition and leasing channels in Southern California, Via will work with our trusted national leasing partners, such as Avis or VGM, to procure a microtransit fleet that is clean, well-maintained, accessible, and tailored to the needs of the City’s service. Our close relationships with our leasing partners allow us to launch services quickly at very competitive rates, and enable us to flexibly support a variety of fleet configurations as service needs evolve. Via works closely with our partners on an ongoing basis to determine the optimal fleet size based on overall expected ridership, demand patterns according to time of day, day of week, and season, and ongoing vehicle maintenance needs. Leveraging our proprietary supply optimization tools and robust performance data, we will ensure that we deploy active vehicles to match expected demand in the most cost-efficient way possible, while also effectively meeting rider needs.

Our partnerships with national leasing partners are also unique in that they provide access to the significant national fleets that both companies maintain for their other business lines. As a result, we are able to quickly “flex” additional fleet into our services, allowing us to immediately respond in the event of operational challenges such as higher than predicted maintenance issues or service expansion needs. We are able to rapidly deploy temporary Avis or VGM vehicles, typically within 1-3 weeks. Should we choose to increase fleet size because of a change in service design, we can access additional permanent, branded fleet vehicles within 2-4 weeks.

Vehicle Maintenance and Preventative Maintenance Program Via’s Maintenance Program is a critical component of our operational excellence. We leverage a data-driven software system to set and monitor maintenance intervals according to a vehicle’s use case and manufacturer specifications, in addition to local, state, and federal guidelines. All of this information is stored in our Vehicle Database, which contains complete vehicle histories including past preventative maintenance, repairs, and other key data. This data-driven approach enables us to meet or exceed the manufacturer’s recommended service plan for vehicles being used as part of the project.

In the Vehicle Database, a preventative maintenance schedule is created for each vehicle in the fleet based on vehicle and manufacturer requirements, mileage, and maintenance history. Preventative maintenance is scheduled through our tracking software, and all performed maintenance is recorded and linked to a vehicle’s VIN. The system will issue reminders to maintenance personnel when required maintenance is approaching.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 39 Additionally, drivers complete Daily Vehicle Inspection Reports (DVIRs) prior to their shifts to ensure that the vehicles are in good operating condition. After daily service, vehicles are inspected to ensure that all lights are functioning, all seating is secure and that all tires, wheels, lugs, air brake systems (if applicable), wheelchair lifts (if applicable) and exit doors are in proper operating condition.

Maintenance checklist in the Vehicle Database (by mileage) In addition, vehicle cleanliness is a top priority for our operations teams, given the impact on customer satisfaction and safety. We will develop specifications and checklists ensuring that all vehicles meet Via’s and the City’s cleanliness standards, remaining consistently free of trash, debris, and odors. Our maintenance team will vacuum seats and floors, wipe down surfaces in vehicles, including, but not limited to, dashboards, consoles, seatbelts, and door handles. Vehicles will undergo professional deep cleanings at least once per week by a professional service and daily maintenance cleanings by in-house personnel. We are happy to adjust any aspect of our cleaning regimen to accommodate specific requests by the City.

A sample Vehicle Maintenance Plan for a similarly-sized turnkey microtransit service is attached to this proposal as Appendix B.

Storage and Maintenance Facility
Via will rent a lot inside or near the service area to store vehicles outside of service hours.

This facility will be equipped with EV charging stations to support the overnight charging of vehicles. Our Operations team has initiated a search with a local broker to identify suitable locations ahead of service launch, leaving us with ample time to coordinate installation if a suitable location with preexisting charging infrastructure cannot be Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 40 - ---- -
-
-- ... -
6 ------
··- 4 __- _ ... __
.
-.-.-- .-
------------ ---�-
0 -
• • • •
identified. Vehicle repairs beyond basic daily maintenance will be conducted off-site and coordinated with our national leasing partners.

1.4.4 Autonomous Vehicle Integration
Innovation is at the core of Via's approach to designing and operating turnkey microtransit services. Our commitment to advancing public mobility has set new industry standards by integrating ultra-modern technology with forward-thinking strategies. To date, Via is the only mobility company with direct experience deploying AVs across a variety of vehicle form factors, geographies, and transit use cases to provide tens of thousands of autonomous rides around the world. Our vehicle-agnostic software platform has also been proven to be the most reliable, comprehensive, and effective solution for deploying autonomous demand-response services. Leveraging our world-class software platform, we successfully design, deploy, and operate AVs as public microtransit services around the world - from students in Texas to seniors in Australia.

Should the City be interested at any point during our partnership, we are able to leverage our existing partnerships with AV providers to secure the type of vehicle that meets the City's expectations, including May Mobility, Beep, and multiple other providers. Before any autonomous vehicle deployment, we will work closely with the City Project Manager and other stakeholders in Beverly Hills to secure written approval and ensure that the deployment aligns with the City's service goals and objectives. Autonomous vehicles will comply with all applicable federal, state, and local regulations. c
CCTA
The Arlington RAPID pilot program (a joint venture between Via and May Mobility) was the first in the United States to integrate on-demand autonomous vehicles into an existing public
transportation service. Since launching in 2019, the service has provided more than 60,000 rides to residents, university students, and visitors around Downtown and the University of Texas at Arlington campus.

In September 2024, Via and May Mobility partnered with the Contra Costa Transportation Authority to launch PRESTO, a shared AV service in Martinez, California. A goal of the service is to improve access to healthcare in the area by providing another reliable and convenient mode of transportation for Contra Costa Regional Medical Center patients and members of the general public.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services I 41

1.4.5 Staffing and Support Services
Via's turnkey model includes a full range of staging and support services. Below we describe our approach to driver training and recruitment, dispatching and customer service, and technical support.

Vehicle Operators
Beverly Hills' microtransit service will be operated by an engaged, qualified, and reliable pool of employee drivers, many of whom will be hired directly from the local community.

By focusing on local hiring in Los Angeles County, we ensure that drivers are invested in providing quality service to their community, while reducing the risk of costly driver shortages that have affected providers nationwide. We deliver these results through a combination of incentives, including above-market wages, targeted driver marketing, high-touch support, a mentorship program with senior drivers, a shift-claim model that gives drivers significant input into their own schedules, and hands-on, in-vehicle training.

For details on Via's local hiring and employment plan, please refer to section 1.3 Staffing. "It feels good to be able to provide a service and help people accomplish the things they need to do during the day."
- Ligia Alicea, Via driver in Jersey City since 2020
Driver Screening
Via's hiring procedure for our microtransit drivers includes a robust screening and vetting process, which we will align with the City's requirements. All drivers are required to undergo detailed background checks, driving record reviews, and criminal record reviews. Key requirements include, but are not limited to:
• Valid California driver's license
• Prior employment verification
e State motor vehicle records check
• Criminal background check
• Road test certification
• Annual list of violations
e FTA-compliant mandatory drug and alcohol testing
• English proficiency test
Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services] 42 ● Outstanding customer service skills
Once drivers have passed the application phase, and have conducted the necessary checks, tests, and reviews specified above, they are subject to a comprehensive final review process on their first day to ensure that they have met and exceeded our hiring requirements before they begin the onboarding and training process described below.

Driver Training
The Via team has successfully trained tens
of thousands of drivers across our global
deployments, facilitating both
behind-the-wheel training and classroom
programs to cover the essentials of
providing safe and reliable service. We
also work with organizations such as the
National Safety Council (NSC), Driverge,
and the Community Transportation
Association of America (CTAA) to furnish
safety training, first aid training, sensitivity
training, passenger assistance training, drug and alcohol awareness training, wheelchair securement training, and defensive driving training, among other topics. As part of the onboarding process, and at regular intervals as part of ongoing, annual refresher training, drivers participate in an intensive series of workshops, including sessions on:

Introduction to Beverly Hills
Basic information about Beverly Hills’ service, including service hours, service area boundaries, and service rules.

How to Use the Via Driver App
Workshops on using the Via Driver App for safe and reliable service, including sessions on troubleshooting and reporting technical issues.

Customer Service Training
How to provide outstanding customer service, including instructions on greeting passengers, providing assistance to those who may not understand how to use the service, and handling customer complaints.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 43 Sensitivity and Accessibility Training
How to assist elderly passengers with and passengers with limited mobility in a sensitive manner, in compliance with the requirements of the Americans with Disabilities Act (ADA).

Mandatory Safety Training
Series of workshops on topics such as defensive driving and safely navigating roads; vehicle and equipment operation; and following safety and emergency instructions, including how to handle and report accidents and major incidents.

Once they are on the road, drivers are continuously evaluated based on rider feedback, continuous driver record monitoring, and observation by our local field staff. Via regularly runs reports on driver performance including for metrics such as on-time performance and customer feedback to identify drivers who may require additional training. Drivers who fail to improve with additional training, or who are failing to meet Via or the City’s service standards, will undergo retraining or in some cases may be removed from the service altogether.

Safety Program
With more than 5.8 million miles driven every month, Via’s drivers and vehicles are the cornerstone of our safety program. Our driver recruitment and vetting processes, onboarding and training, strict vehicle requirements, and comprehensive vehicle inspection plans ensure that we are able to provide industry-leading safety in our services. In addition to these general safety measures, Via has invested in tech-enabled operational advances to ensure that we can be proactive when it comes to safe driving.

This includes in-vehicle video recording with auto-save features to ensure any traffic violations or near-violations are clearly documented; preventative tools such as AI programs that detect potentially risky in-vehicle behavior; and audio alerts to help drivers avoid accidents before they ever occur.

Via has established rigorous operational processes to ensure that every driver maintains the highest professionalism standards, prioritizes rider safety, and delivers reliable service. Our driver recruitment and vetting processes, onboarding and training, strict vehicle requirements, and comprehensive vehicle inspection plans ensure that we are able to provide industry-leading safety in our services: out of the almost 5 million trips that we served in 2023, only 0.005% of Via-provided rides had a substantiated safety-related incident.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 44 In April 2024, Via hosted our first Safety Month to elevate safety awareness across our services. In total, about 500 drivers attended a safety workshop, about 800 vehicles underwent an audit, and 700 riders received a preventative safety message in this highly successful celebration of Via's safety culture.

In the unlikely event of an accident, Via will provide the City with a report and notify the City if an incident could affect the fleet. Please see section 146 Mitigation of Risks and Challenges for more details on how we respond to these incidents.

Dispatching and Customer Service
From our experience as both operators and
software providers for transit services around
the world, we understand that high-quality
customer service and technical support is
incredibly important for our on-demand public
transportation riders, drivers, and partners.

Within our turnkey model, we leverage this
experience to provide full-spectrum customer
support, covering all aspects of operational
and technical assistance. Our Customer
Support agents are available to assist riders via phone, text, in app, and email queues in multiple languages, such as English and Spanish. Agents are able to provide support with booking rides, troubleshooting service issues, documenting customer feedback, and other rider needs as necessary. Customer Support performance is regularly monitored to ensure service compliance, and all agents are subject to random quality assurance checks. We have developed predefined escalation procedures to ensure that all concerns are addressed with the appropriate level of support and oversight, and that all relevant parties are kept apprised of updates and resolution timelines.

Training and Technology Support
As described in section 13 Staffing, Alex Battisti will serve as our dedicated Partner Success Manager, the City's main point of contact for training and technology support.

Alex will be available to support the City via email and over the phone during service hours. He will also provide training and manuals for City staff, offer refresher sessions on Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services ] 45 an as-needed basis, and provide additional training after significant software updates. As a unified provider for software and operations, Via is able to offer this training and support at no additional cost to the City. All of our project staff are Via experts, ensuring rapid troubleshooting and the optimal use of the platform.

Additionally, Beverly Hills will have around-the-clock access to Via’s technical support platform. A rotating team of support engineers is on call at all times to resolve any problems that may arise. Incidents are escalated using a predefined alert protocol, which instantly notifies the on-call member of the team. The technical team member will immediately examine the issue to begin the process of issue resolution and resource allocation. All issues will be resolved based on their level of severity and associated response times, and Via will provide the City with regular status updates on resolution.

1.4.6 Mitigation of Potential Risks and Challenges
Operational Shortfalls
Through our experience providing software and turnkey microtransit services for more than 750 partners around the world, we understand how important it is to maintain continuity of service in case of unforeseen staffing shortages, vehicle issues, and technology failures. We have developed the following strategies to mitigate potential risks and challenges due to these operational shortfalls:
● Staffing Issues: We know that running excellent transit operations depends on fostering strong retention and consistency among our drivers. We have developed a high-touch driver engagement program that we leverage throughout our operations to minimize turnover, including frequent office hours, 1:1 support provided by the local team, and ongoing learning and development opportunities.

We also perform ongoing compensation benchmarking to ensure that we are always providing fair and competitive driver rates. We also offer various incentive programs and performance-based bonuses to improve retention when necessary. ● Vehicle Issues/Maintenance: Via’s preventative maintenance program takes a proactive approach to vehicle maintenance, detecting issues early through regularly scheduled inspections. Whenever possible, preventative maintenance and general repairs will be scheduled to avoid service disruption. Via will maintain a spare vehicle to ensure full coverage in the event of unexpected vehicle issues.

As described in section 1.4.3 Equipment & Supplies, we are also able to deploy temporary vehicles to replace vehicles that cannot be quickly returned to service, Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 46 typically within 1-3 weeks. Permanent vehicles with the City’s custom branding can be accessed within 2-4 weeks.
● Mobile App Issues: Our system is highly stable, delivering 99.9% uptime. As described in section 1.4.5 Staffing and Support Services, a rotating team of support engineers is on call at all times to resolve any problems that may arise.

Vehicles Involved in Collisions or Vandalism
If a vehicle has been involved in a collision and/or has a mechanical defect that impairs safe operation, Via’s team will immediately remove the vehicle from service until it is repaired and able to operate safely. For roadside incidents, Via will ensure the driver is safely transported back to the lot while the impacted vehicle is towed away, and Via will also make arrangements to have another driver in service pick up any passengers on board and transport them to their destinations. Via will coordinate the repair of any issue identified as expeditiously as possible and we will keep the City informed of details regarding the incident and the resolution timeframe.

Unruly or Uncooperative Passengers
Via has developed policies and procedures for drivers to follow in the event of passenger issues and/or disturbances. For any real-time issue with a rider, drivers are advised to de-escalate a situation when within their control. For example, if the number of passengers at pick-up does not match the number of passengers recorded in the app, drivers are advised to ask the rider to correct the value. If this is not well-received by the passenger, drivers have the ability to update passenger count by using the chat function within the Driver App. If there is a customer-related issue that cannot be de-escalated at the point of boarding, the driver is advised to either refuse the ride if their safety feels compromised or to call support to advise them of the situation, if they can do so safely. In any circumstance that involves criminal behavior, the driver is instructed to call 911 and then report the situation to the support team immediately.

Recharging/Fueling of Vehicles During Service Hours
Managing EV services requires a complex interaction between hardware (vehicles and charging stations), software (shift planning, routing, and charge cycle management) and people (passengers, drivers, fleet teams, and shift supervisors). Via’s turnkey solution for Beverly Hills includes both proprietary technology and operational strategies for planning and optimizing each of these components, which will enable us to deliver a seamless EV service for the City’s pilot. For example, Via’s platform includes built-in capabilities that support electric fleets, including proprietary simulation tools that factor in vehicle Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 47 charging requirements to ensure vehicles
have enough charge capacity to serve
demand throughout the day. The platform
also displays each vehicle’s battery status
and remaining range, allowing dispatchers
the ability to notify drivers if their vehicle is
at risk of running low on charge. Although
our vehicle charging plan prioritizes the
overnight charging of EVs at designated
parking spaces, we will leverage
publicly-available charging infrastructure in
the City of Beverly Hills to recharge
vehicles during service hours if necessary.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 48 Vehicle State of Charge by Shift
f •

2. References
Via has extensive experience designing and operating turnkey microtransit services that enable cities like Beverly Hills to achieve their public mobility goals, including supporting a shift away from single-occupancy vehicles, reducing greenhouse gas emissions, and improving connectivity to local and regional transportation networks. Below, please find a list of three references who can speak to the quality and effectiveness of our services.

Brief descriptions of these reference case studies for the implementation of Via's turnkey microtransit solution are provided on the following pages. We have also included an additional case study for our partnership with Richmond, CA, as it displays a successful all-electric microtransit service in California.

Silicon Valley Hopper
(City of Cupertino, CA)
Bayview Shuttle
(SFMTA)
Link On-Demand
(City of Lone Tree, CO)
Silicon Valley Hopper
In October 2019, the City of Cupertino partnered with Via to deliver their first on-demand service and address key goals such as increasing traffic congestion, limited alternatives to single-occupancy vehicle
travel, and no first- and
last-mile connection to
fixed-route transit throughout
the greater Silicon Valley area.

After several highly successful
years of on-demand service in
the city of Cupertino, the cities
of Cupertino and Santa Clara
joined forces with Via to apply
Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services I 49 for an $8.5M grant from the California State Transportation Agency (CalSTA) to improve regional connection and advance the state’s mission of reducing transportation emissions. In addition to expanding service to Santa Clara the zones also serve two key fixed-route transit hubs in Mountain View. The service and our ability to drive ridership have both been extremely successful: over 70% of riders switched from single occupancy vehicles to microtransit, and we have already delivered more than 100,000 rides. Today, the service operates with a 100% electric fleet, leading to the elimination of 76,000 metric tons of carbon dioxide equivalent (MTCO₂e).

Bayview Shuttle
This year, Via partnered with the San Francisco Municipal Transportation Agency (SFMTA) and the California Air Resources Board to bring an on-demand shuttle service to Bayview-Hunters Point, an historically underserved neighborhood with limited transportation options. Via worked closely with community stakeholders to address the agency’s ongoing commitment to equity and design a service that is fully responsive to local needs. The goal is to seamlessly ferry passengers within the service area and to external points of interest, such as the 22nd St Caltrain Station, the San Francisco General Hospital, the 24th St./Mission BART Station, and the Bayshore Caltrain Station. The initiative also aims to create local workforce pathways by recruiting Bayview residents to be shuttle drivers, with the goal of eventually getting jobs with the municipal transit agency. The service, which launched in November, has been popular among community members and ridership continues to
grow, with a recent record of 111 rides
per day. “For too long, this
neighborhood has needed safer and
easier access to transportation,” said
Supervisor Shamann Walton, whose
district includes the Bayview. “I’m proud
that we’re rolling out a shuttle service
that can help break down the obstacles
that our residents have historically had
to navigate on their own.”
Link On-Demand
Lone Tree, CO is a fast-growing suburb of Denver. Local residents previously had few options for reaching local business and major employers in the area, and limited access to the regional light-rail commuter line. In 2019, the City partnered with Via to power their Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 50 first- and last-mile microtransit service.

The Via platform provided the City with
enhanced service visibility and
comprehensive reporting tools, which
their previous technology provider
lacked. The City was also able to
decrease their cost per ride by 30%
while increasing daily rides by 41%.

Building on this success, the City
expanded its software partnership with
Via to include turnkey microtransit
operations, unlocking efficiencies by choosing a unified provider for software and operations. Since Via took over operations in 2023, the service has achieved a nearly 3x increase in utilization, as measured by passengers served per vehicle hour.

Richmond MOVES
In April 2022, Via partnered with the City of Richmond to launch Richmond MOVES, the city’s first on-demand public shuttle service, with a fleet of 100% plug-in hybrid electric vehicles to reduce energy consumption. Richmond MOVES’ goal is to fill access gaps in the city’s transportation network, which has historically lacked intra-city transit options and faced challenges from heavily polluted air. The service enables residents to easily connect with key transit hubs — such as Amtrak and BART stations and the Ferry Terminal — without a private car. The popularity of Richmond MOVES has continued to grow month over month, hitting an all-time high with nearly 5,897 monthly rides served in October 2024. Initially funded by the
California Clean Mobility Options
(CMO) Voucher Pilot Program, Via
helped the City of Richmond secure an
additional $3.2M in state funding to
support the existing pilot and expand
service to nearly the entire city. New
data validates Richmond Moves is
making a positive environmental impact
on the city, with nearly 50% of rides
replacing trips previously served by
single-occupancy vehicles.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 51

3. Cost Proposal
Via offers a transparent pay-as-you-go cost structure that includes regular reporting to keep Via accountable to meeting the City’s ridership and budget targets. We will only deploy the hours that the City needs to meet demand, guaranteeing controlled costs and optimal service efficiency. Our pricing model is designed to maximize efficiency over time, allowing costs to gradually ramp up as the service scales, and ensuring the longterm sustainability of the pilot service.

Our cost proposal for the City of Beverly Hills assumes a service operating from 6:00 am to 10:00 pm every day, with peak hours from 7:00 am to 9:00 am and 4:00 pm to 7:00 pm on weekdays. We anticipate deploying 4 vehicles to satisfy peak demand on weekdays and 3 vehicles on the weekends, for an estimated total of 327 vehicle hours per week.

Rates and budget for this proposal are included in a separate file, as per the instructions in the RFP. The rates provided are for a fleet consisting of two Volkswagen ID Buzz EV busses and two Ford E-Transit EV WAVs with one additional spare, as outlined in the proposal narrative. We would be happy to provide the City with refreshed pricing as this service model is refined or if the City has a different fleet preference.

Our pricing structure includes two fee categories:
● One-Time Upfront Costs: This category includes the launch and implementation costs associated with getting the service up and running, including technology localization, quality assurance and system testing, launch preparation, WAV retrofits, vehicle wraps, and charging infrastructure.
● Per-Vehicle Hour Fees: Via’s all-inclusive per-vehicle hour fee covers all operating and ongoing technology costs required to deliver an outstanding quality of service for the City and its riders. This fee is charged on a monthly basis according to the number of vehicle hours actually used. This all-inclusive fee also covers the delivery of ongoing support from all positions required for service.

Any fares collected by Via will either be credited back to the City or reinvested in service enhancements at the City's sole discretion. Potential savings to the City from fare credits are outlined in the cost file, assuming a $2 flat fare for rides inside the proposed service area. Fares are fully customizable, and we look forward to working with the City to determine the optimal fare structure according to the City’s ridership goals and needs.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 52 Alternative Pricing Scenarios
Via is committed to developing creative solutions with our partners to deliver the highest possible quality of service for every budget. For example, the overall cost to the City could be reduced in the following ways:
● Charging Infrastructure: Via’s Operations team is currently reviewing suitable locations for vehicle storage and charging in and around the service area. If we are able to identify lots that are adequately supplied with charging stations, we would deduct the cost of installation from the one-time upfront fees, ● Modified Service Design: In our initial service analysis, Via Strategies has already identified several opportunities for cost savings without diminishing the overall quality of service, such as slight reductions in the total number of service hours, the number of active vehicles, or the extent of the service zone. ● Independent Contractor (IC) Drivers: While our core proposal fulfills the City’s requirement for W2 employee drivers, we have found that in services of this type an IC model can result in greater flexibility for drivers at a significantly lower cost to our partners. IC drivers benefit from the same above-market wages as employees and the freedom to set their own availability and schedule. We have successfully deployed this model in many microtransit services that we operate, both in California and across the United States.

We would be delighted to discuss our proposal further with the City and work to design a high-quality, efficient service that aligns with the City’s goals and funding availability.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 53

4. Business License
Proof of Via’s registration with the Secretary of State to conduct business in the State of California is attached.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 54 Secretary of State
Certificate of Qualification / Registration
I, SHIRLEY N. WEBER, PH.D., California Secretary of State, hereby certify:

Crosby Street Transit LLC
202464110938
10/03/2024
Limited Liability Company - Out of State

DELAWARE
Entity Name:

Entity No.:

Registration Date:

Filing Type:

Formed In:

The above referenced entity complied with the requirements of California law in effect on the Registration Date for the purpose of qualifying to transact intrastate business in the State of California, and that as of the Registration Date, said entity became and now is duly registered, qualified and authorized to transact intrastate business in the State of California, subject however, to any licensing requirements otherwise imposed by the laws of this State and that the entity shall transact all intrastate business within California under the Entity Name as set forth above.

No information is available from this office regarding the financial condition, status of licenses, if any, business activities or practices of the entity.

IN WITNESS WHEREOF, I execute this certificate and affix the Great Seal of the State of California this day of October 04, 2024.

SHIRLEY N. WEBER, PH.D.

Secretary of State
Certificate No.:

To verify the issuance of this Certificate, use the Certificate No. above with the Secretary of State Certification Verification Search available at bizfileOnline.sos.ca.gov. 253899132

5. Insurance
Via maintains coverage that is fully compliant with the indemnity and insurance requirements stated in the sample contract.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 56 Appendix A: Sample Metric Report
Below we have included screenshots of dashboards that Beverly Hills will be able to access through the Via Operations Center (described in section 1.4.2 Technical Specifications). The sample reports reflect a ten-day snapshot of activity for a similarly-sized service in California:

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services I 57 Other dashboards provide deeper insight into rider growth and rider experience, key indicators of success for any microtransit service:

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 58 In addition to these dashboards, Beverly Hills will have access to all the underlying data, which can be exported in a range of formats. The table below summarizes the data and graphs that are provided in our standard service package.

Dashboard Data / Graphs provided
Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 59 Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 60 I
I
I
I
I -
Appendix B: Vehicle Maintenance Plan
A sample Vehicle Maintenance Plan for one of Via’s turnkey microtransit services is attached. Specific details in this plan may be changed according to the vehicle choice for the City of Beverly Hills’ fleet.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 61

Proprietary and Confidential Information
Crosby Street Transit LLC’s (“Via”) response and all supporting documentation, including associated exhibits and appendices, comprise proprietary, confidential, and trade secret information, exempt from disclosure under California Government Code (“C.G.C.”) § 7920 et al. (“California Public Records Act”). Information presented in our response relating to the pricing of Via's services, back-end application processes, proprietary algorithms, unique business methodologies, and sensitive information on key performance indicators are our confidential business information, which qualify as trade secrets under California and federal law. This information is exempt from disclosure under several provisions of the California Public Records Act, including but not limited to, C.G.C. § 7927.705 (disclosure is “prohibited pursuant to federal or state law,” including laws protecting trade secrets such as Section 1060 of the California Evidence Code, the federal Defend Trade Secrets Act, the California Uniform Trade Secrets Act and state common law) and C.G.C. § 7922.000 (balancing of public interests). If this proprietary and confidential information is disclosed, it would harm Via by giving its competitors an unfair advantage. In addition, the public has an overwhelming interest in maintaining the confidentiality of proprietary information disclosed in the RFP process to avoid discouraging companies from full participation in public procurement processes. Via’s response and accompanying materials also include personal information about Via’s employees and other individuals, which is exempt from disclosure under both C.G.C. § 7927.700 (disclosure would constitute an “unwarranted invasion of personal privacy”) and C.G.C. § 7927.705 (disclosure is prohibited by state law, which would include California’s Constitutional right to privacy in Article I, section 1, and the California Consumer Protection Act). Accordingly, we request that your office maintain the confidentiality of our responses and provide us with notice of any request for information under the California Public Records Act prior to production by contacting [email protected].

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 77 Intellectual Property
The Via Transportation, Inc. products are protected by one or more of the following U.S., European or International Patents:

US: 9,816,824 ; 9,562,785 ; 10,197,411 ; 10,677,604 ; 10,168,168 ; 10,168,167 ; 10,458,803 ; 10,677,602 ; 11,107,352 ; and other patents pending.

Europe: EP3355028; NL3355028; FR3355028; GB3355028 ; DE3355028 ; and other patents pending.

Proprietary, Confidential, and Trade Secret Information Turnkey Microtransit Services | 78

← All documents from this meeting