CITY COUNCIL/SUCCESSOR AGENCY AGENDA
Zoom Webinar ID: 760 1397 0037

May 14, 2024, 7:00 p.m.

City Council Chambers
150 City Park Way
Brentwood, CA 94513
City Council Zoom Link
A. CALL TO ORDER & ROLL CALL
B. PLEDGE OF ALLEGIANCE
C. PUBLIC COMMENTS
Pursuant to Council/Administrative Policy, Meeting Rules and Procedures section 5.2 (Decorum Generally – Public), comments by members of the public are generally limited to five minutes, or less time if a large number of speakers is anticipated, or if approved by the Mayor. Speakers desiring answers to questions should direct them to the Council/Successor Agency and, if relevant, they may direct them to the appropriate staff member. Speakers can also follow up directly with staff during regular City business hours.

Please file a speaker’s card with the City Clerk on the form provided on the counter at the back of the Chambers.

During this portion of the meeting those present in the Council Chambers are permitted to speak on items that are listed under Presentations; Informational Reports; Consent Calendar; Requests for Future Agenda Items- New Items; or items not on the agenda during this portion of the meeting. Public comments for scheduled agenda items should wait until that time.

Zoom participation during this general public comment period will not be accepted.

D. INFORMATIONAL REPORTS FROM COUNCIL MEMBERS, COMMITTEES, LIAISONS, AND STAFF This portion of the agenda is to provide an opportunity for Council Members to report on attendance at events, subcommittee meetings, and entities on which the Council Member has been appointed as a liaison and for staff to provide brief updates and/or information to the City Council.

E. CONSENT CALENDAR
All matters listed on the consent calendar are considered routine in nature and will be enacted by one motion. If discussion is required, that particular item will be removed from the consent calendar and will be considered separately.

E.1 Minutes of the Special City Council meeting of April 23, 2024 E.2 Minutes of the City Council/Successor Agency meeting of April 23, 2024 E.3 Minutes of the Special City Council meeting of April 30, 2024 E.4 A Proclamation Proclaiming May 27, 2024, as Memorial Day E.5 A Proclamation Proclaiming May 13 - 18, 2024, as Armed Forces Week E.6 A Proclamation Proclaiming May 19 - 25, 2024, as Public Works Week E.7 Amendment to Council/Administrative Policy No. 30-1 (Appointment of Planning Commission Members) to be consistent with current practices.

Title/Recommendation
Adopt a resolution amending Council/Administrative Policy No. 30-1 (Appointment of Planning Commission Members) to be consistent with current practices.

E.8 Award of Agreement for Architectural Services to Advance Design Consultants, Inc. for the Water and Wastewater Laboratory Project, CIP Project No. 592-59207.

Title/Recommendation
Adopt a Resolution approving and authorizing the City Manager or designee to execute an Agreement for Architectural Services with Advance Design Consultants, Inc. (“ADC”) in the amount of $279,330, plus funding authorization for a 15% contingency of $41,899.50, for a total funding authorization not to exceed amount of $321,229.50, for the Water and Wastewater Laboratory Project, CIP Project No. 592-59207 (“Project”).

E.9 Purchase and Sale Agreement with Nunn Family (No.2) Limited Partnership for utility easements to service the Innovation Center @ Brentwood.

Title/Recommendation
Adopt a resolution approving and authorizing the City Manager, or designee, in coordination with the City Attorney, to execute an Agreement for Purchase and Sale of Easement Rights, in substantial conformance with the attached Agreement, with Nunn Family (No.2) Limited Partnership, for a portion of APNs 019-081-023 and 019-081-024, to acquire utility easements necessary for CIP Project No. 336-31695, Innovation Center @ Brentwood Infrastructure (“Project”) for $193,904, and authorizing execution of other documents as necessary to complete the right-of-way transaction.

E.10 Purchase and Sale Agreement with Brian Joseph Friedel for road right-of-way for the Lone Tree Way Roadway Improvements, CIP Project No. 336-31701.

Title/Recommendation
Adopt a resolution approving and authorizing the City Manager, or designee, to execute an Agreement for Purchase and Sale of Real Property, with Brian Joseph Friedel for a portion of APN 018-100-031, to acquire road right-of-way for Lone Tree Way Roadway Improvements, CIP Project No. 336-31701 (“Project”) for $120,203, and authorizing execution of other documents as necessary to complete the right-of-way transaction.

E.11 Purchase and Sale Agreement with Louis A. Ferraro, as Trustee of the Louis A. Ferraro Family Trust dated July 2, 2004 for road right-of-way for the Lone Tree Way Roadway Improvements, CIP 336-31701.

Title/Recommendation
Adopt a resolution approving and authorizing the City Manager, or designee, to execute an Agreement for Purchase and Sale of Real Property with Louis A. Ferraro, as Trustee of the Louis A. Ferraro Family Trust dated July 2, 2004, for a portion of APN 018-100-038, to acquire road right-of-way for Lone Tree Way Roadway Improvements, CIP Project No. 336-31701, for $68,303, and authorizing execution of other documents as necessary to complete the right-of-way transaction.

E.12 Award of contract to Ghilotti Bros., Inc. for Lone Tree Way Roadway Improvements (Phase 1), CIP Project No. 336-31701.

Title/Recommendation
Adopt a Resolution approving the contract documents, awarding the bid and authorizing the City Manager or designee to execute a contract and necessary documents for Lone Tree Way Roadway Improvements (Phase 1), CIP Project No. 336-31701, (“Project”) with Ghilotti Bros., Inc. (“GBI”) as the lowest responsible and responsive bidder in the amount of $2,031,692.30, plus funding authorization for a 15% contingency of $304,753.84, for a total funding authorization not to exceed amount of $2,336,446.14.

Page 2 of 244 ends

F. BUSINESS ITEMS
Persons addressing the City Council using Zoom are asked to raise their hands using the Zoom feature. Those attending in person and wishing to address the Council may do so from the podium. The Council may adopt reasonable regulations at the onset of each business item to facilitate public testimony. These regulations may include time limits. In the absence of such regulations, the item shall follow the protocol for Public Comments. Public comment on each of the following items is limited to what is described in the specific agenda item.

F.1 Discuss and provide direction regarding potential modifications to the regulation of outdoor dining and merchandise displays in Downtown Brentwood to ensure an aesthetic, safe, and accessible environment
Title/Recommendation
Staff recommends that the City Council discuss and provide direction regarding potential modifications to the regulation of outdoor dining and merchandise displays in Downtown Brentwood, as well as implementation of an updated ordinance, and authorize staff to prepare the appropriate text amendments to the Brentwood Municipal Code and Downtown Specific Plan for Planning Commission consideration.

G. REQUEST FOR FUTURE AGENDA ITEMS - NEW REQUEST(S)
Council Members wishing to have an agenda item placed on a future agenda shall make a request under this section of the agenda. These items will be included on the agenda for the next Council meeting
H. ADJOURNMENT
Any disclosable public records related to an agenda item for the open session of this meeting distributed to all or a majority of the City Council less than 72 hours before this meeting is available for inspection at City Hall, located at 150 City Park Way, during normal business hours.

These writings will also be available for review at the City Council meeting in the public access binder in the entrance of the City Council Chambers.

Public comments received after 3:00 p.m. of the meeting date, but prior to the start of the meeting, will be emailed to the City Council, posted online at www.brentwoodca.gov/councilmeetingonline within one day following the meeting, and will be summarized in the meeting minutes.

The Closed Captioning provided via Zoom is auto generated. It is not the official record and is provided as a convenience.

If you challenge the any of the matters listed under 'Public Hearings' in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence delivered to the Brentwood City Council at, or prior to, the public hearing
NOTICE
In compliance with the Americans with Disabilities Act, the meeting room is wheelchair accessible and disabled parking is available at the City Hall parking lot. If you are a person with a disability and you need disability-related modifications or accommodations to participate in this meeting, please contact the City Clerk's Office at (925) 516-5440 or fax (925) 516-5441. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting. {28 CFR 35.102-35, 104 ADA Title II}

POSTING STATEMENT
On May 10, 2024, a true and correct copy of this agenda was posted on the City Hall Bulletin Board, outside City Hall, 150 City Park Way, Brentwood, CA 94513 and at our website www.brentwoodca.gov
A complete packet of information is available for public review at City Hall or on our website at www.brentwoodca.gov

Page 3 of 244 ends

1 SPECIAL CITY COUNCIL MINUTES
April 23, 2024, 5:30 p.m.

A. CALL TO ORDER & ROLL CALL
Mayor Bryant called the meeting to order at 5:30 p.m.

Roll Call found the following members present: Mendoza, Meyer, Pierson, Oerlemans, and Mayor Bryant.

Council Member Mendoza participated remotely via Zoom Teleconference at the noticed teleconference location: Arizona Biltmore Conference Center Hallway 2400 E. Missouri Ave, Phoenix, AZ 85016.

B. PLEDGE OF ALLEGIANCE
Mayor Bryant led the Pledge of Allegiance.

C. PUBLIC COMMENTS
Mayor Bryant opened Public Comments. With no one wishing to speak, Mayor Bryant closed Public Comments.

D. RECESS TO CLOSED SESSION
It was moved/seconded by Vice Mayor Meyer/Council Member Mendoza to recess to Closed Session at 5:31 p.m. Motion carried with Mendoza, Meyer, Oerlemans, Pierson, and Mayor Bryant in favor.

D.1 CONFERENCE WITH LABOR NEGOTIATORS
E. RECONVENE IN OPEN SESSION
City Council reconvened in open session at 7:13 p.m. and Mayor Bryant called to order the regular meeting of the City Council and Successor Agency.

Page 4 of 244 ends

1 CITY COUNCIL/SUCCESSOR AGENCY MINUTES
April 23, 2024, 7:00 p.m.

A. CALL TO ORDER & ROLL CALL
Mayor Bryant called the meeting to order at 7:13 p.m.

Roll Call found the following members present: Mendoza, Meyer, Pierson, Oerlemans, and Mayor Bryant.

Council Member Mendoza participated remotely via Zoom Teleconference at the noticed teleconference location: Arizona Biltmore Conference Center Hallway 2400 E. Missouri Ave, Phoenix, AZ 85016
B. PLEDGE OF ALLEGIANCE
Mayor Bryant led the Pledge of Allegiance.

C. REPORT ON CLOSED SESSION
Mayor Bryant reported there were no reportable actions.

D. PUBLIC COMMENTS
Bill Weber provided comments on the positive influence of youth leadership, the need of additional membership with the Kiwanis Club of Brentwood, and comments related to the Jewish American Heritage Month proclamation.

Danny Dohrmann provided comments related to virtual public comments during the general public comment period, thanked Assistant City Manager Darin Gale for taking time to speak with him regarding a Community Enrichment matter related to Brentwood Municipal Code §17.640.008 and §17.640.009, and comments related to a moratorium on drive-through establishments.

Carolina Villaseca requested City Council pull item F.18 from the Consent Calendar, provided comments regarding the Delta Conveyance Project, and provided information on the upcoming All Abilities Family Picnic at Marsh Creek Elementary on May 18th from 11 a.m. to 1:30 p.m.

E. INFORMATIONAL REPORTS FROM COUNCIL MEMBERS, COMMITTEES,

LIAISONS, AND STAFF
Council Member Mendoza reported on attendance shadowing Senator Steve Glazer in Sacramento, Latino Caucus Communications Subcommittee and noted she will be moving to the Legislative Review Committee, watched the Planning Commission meeting, and attendance at an Our Neighborhood Voices meeting.

Page 5 of 244 ends

2 Council Member Pierson reported she watched the Planning Commission meeting, attended a Police Activities League (PAL) meeting, Juneteenth planning meetings, Age and Disabilities Friendly Communities Ad-hoc Committee meeting, and attended as a guest speaker at the Contra Costa County Bar Association 90th Anniversary Gala.

Council Member Oerlemans reported on attendance at the Brentwood Police Department's Town Hall on human trafficking, watched the Planning Commission meeting, a meeting with Joe Young, president of Trilogy HOA, attendance at the Farmers Market and Makers Mart, and at the PAL BBQ fundraiser supporting Liberty High School.

Vice Mayor Meyer reported on facilitating a Cal Cities Mayors and Council Members virtual roundtable discussion, attendance at the Youth and Government mock City Council meeting, Community Day of Service planning meeting, watched the Planning Commission meeting, attendance at the Age and Disabilities Friendly Communities Ad-hoc Committee meeting, Our Neighborhood Voices meeting, and a presentation by the Contra Costa County Public Defender's Office on equity.

Mayor Bryant reported on attendance at an East Contra Costa County Habitat Conservancy board meeting, the Youth and Government mock City Council meeting, TRANSPLAN Committee, East Contra Costa Regional Finance Authority, and Bart and State Route 4 Bypass Authority meetings.

City Manager Tim Ogden provided an update on the upcoming Community Day of Service event on April 27, 2024.

F. CONSENT CALENDAR
Mayor Bryant pulled items F.4, and F.18, and Council Member Mendoza pulled item F.14 to be heard separately.

Moved by: Susannah Meyer, Vice Mayor
Seconded by: Tony Oerlemans, Council Member
Adopted the Consent Calendar as recommended by staff.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, Tony Oerlemans, Council Member, and Joel Bryant, Mayor
Motion Approved (5 to 0)
F.1 Minutes of the City Council/Successor Agency meeting of April 9, 2024 F.2 Minutes of the Special City Council meeting of April 9, 2024 F.3 A Proclamation Proclaiming April 26, 2024, as Arbor Day F.4 A Proclamation Proclaiming May 5 - 11, 2024, as Municipal Clerk's Week

Page 6 of 244 ends

3 Mayor Bryant presented the Proclamation to Margaret Wimberly, City Clerk, and Amanda McVey, Assistant City Clerk.

Moved by: Joel Bryant, Mayor
Seconded by: Jovita Mendoza, Council Member
Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, Tony Oerlemans, Council Member, and Joel Bryant, Mayor
Motion Approved (5 to 0)
F.5 A Proclamation Proclaiming May 2, 2024, as National Day of Prayer F.6 A Proclamation Proclaiming May 12 - 18, 2024, as Police Week F.7 A Proclamation Proclaiming May 13 - 19, 2024, as Bike to Work Week F.8 A Proclamation Proclaiming May as Jewish American Heritage Month F.9 A Proclamation Proclaiming May as Asian American and Pacific Islanders Heritage Month
F.10 A Proclamation Proclaiming May as Older Americans Month F.11 A Proclamation Proclaiming May as Water Awareness Month F.12 A Proclamation Proclaiming May as Building and Safety Month F.13 Award a contract to Sandstone Environmental Engineering, Inc. for the Pavement Management Program 2024 (Concrete), CIP Project No. 336-31703.

Adopted Resolution 2024-39 approving the contract, awarding the bid and authorizing the City Manager or designee to execute a contract and necessary documents for the Pavement Management Program 2024 (Concrete), CIP Project No. 336-31703, (“Project”) with Sandstone Environmental Engineering, Inc. (“Sandstone”) as the lowest responsible and responsive bidder in the amount of $378,110, plus funding authorization for a 15% contingency of $56,716.50, for a total funding authorization not to exceed amount of $434,826.50.

F.14 A Resolution accepting park and landscaping improvements on Parcel ‘D’ (Magpie Park).

Moved by: Jovita Mendoza, Council Member
Seconded by: Pa'tanisha Pierson, Council Member
Adopted Resolution 2024-43 accepting the park and landscaping improvements on Parcel ‘D’ of the Chandler development (Subdivision 9428) for maintenance by the City and request that the City Clerk file this Resolution with the Recorder of Contra Costa County.

Page 7 of 244 ends

4 Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, Tony Oerlemans, Council Member, and Joel Bryant, Mayor
Motion Approved (5 to 0)
F.15 Consideration of actions pertaining to the City’s Landscape and Lighting Assessment Districts, including Landscape and Lighting Assessment Districts No. 19-3 and No. 21-1, and the Citywide Park Maintenance District No. 98-1 for Fiscal Year 2024/25.

Adopted Resolution 2024-40 declaring the intention to order improvements for the Landscape & Lighting Assessment Districts, Landscape and Lighting District No. 19-3, Landscape and Lighting Assessment District No. 21-1 (collectively, the “LLADs”), and the Citywide Park Maintenance District No. 98-1 for Fiscal Year 2024/25; declaring the intention to levy and collect assessments; and setting the date of May 28, 2024, at 7:00 p.m. or at such time thereafter that the matter can be heard for the public hearing in accordance with the provisions of the Streets and Highways Code “Landscaping and Lighting Act of 1972” and California Proposition No. 218.

F.16 Purchase two new solid waste collection trucks, and authorize the City Manager or designee to execute any necessary documents in a total amount not to exceed $951,050.

Adopted Resolution 2024-41 approving the purchase of two new collection vehicles for the Solid Waste Division, one residential Labrie split body truck and one Labrie front load truck, from Arata Equipment Company in San Carlos, CA; and authorizing the City Manager or designee to execute any necessary documents in an amount not to exceed $951,050 for fiscal year 2023/24.

F.17 An Agreement with Robertson-Bryan, Inc. for environmental compliance services for the Solid Waste Organics Diversion project and the Water and Wastewater Laboratory project.

Adopted Resolution 2024-42 approving the contract documents and authorizing the City Manager or his designee to execute an Agreement with Robertson-Bryan, Inc. for environmental compliance services for the Solid Waste Organics Diversion, CIP Project No. 542-54021 (SW Project), and the Water and Wastewater Laboratory, CIP Project No. 592-59207 (Laboratory Project), in the amount not to exceed $252,575.

Page 8 of 244 ends

5 F.18 2023 Military Equipment Annual report, Determination of AB 481 Compliance, Renewal of Military Equipment Ordinance, and Approval of Military Equipment
Moved by: Joel Bryant, Mayor
Seconded by: Pa'tanisha Pierson, Council Member
Adopted Resolution 2024-44 1) accepting the 2023 Military Equipment Annual Report; 2) determining that the Brentwood Police Department’s (BPD) use of military equipment in 2023 complied with BPD Policy 708 and applicable state laws; 3) determining that, based on the 2023 Military Equipment Annual Report, each type of military equipment identified in that report has complied with the standards for approval set forth in applicable state laws, including Government Code section 7071(e); 4) renewing Ordinance No. 1037, thereby determining that Policy 708 shall be continued without change; and 5) approving the BPD’s funding, acquisition, and use of military equipment to preserve life and enhance the safety of citizens and officers.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, Tony Oerlemans, Council Member, and Joel Bryant, Mayor
Motion Approved (5 to 0)
F.19 An Informational Summary and Overview of Recent Statewide Housing and Land Use Legislation
Received an informational summary and overview of housing and land use related legislation from the 2023 legislative session.

F.20 Informational Report on Final Map of Subdivision No. 9452, Cowell Ranch, developed by Shea Homes, LP.

Received an Informational Report on Final Map approval by the City Manager of Subdivision No. 9452, Cowell Ranch, developed by Shea Homes, LP, located south of Marsh Creek Road and east of Vineyards Parkway (APN’s 007-380-002 and 007-380-003).

G. PUBLIC HEARINGS
G.1 An Extension of Interim Urgency Ordinance implementing Interim Objective Design Standards for residential housing projects in the City of Brentwood, and finding the action exempt from CEQA
Jennifer Hagen, Senior Planner, presented the item.

Mayor Bryant opened the Public Hearing.

Page 9 of 244 ends

6 There being no one wishing to speak on the item, Mayor Bryant requested a motion to close the Public Hearing.

It was moved/seconded by Council Member Oerlemans /Council Member Pierson to close the Public Hearing and carried unanimously.

Moved by: Tony Oerlemans, Council Member
Seconded by: Pa'tanisha Pierson, Council Member
Adopted Urgency Ordinance No. 1073 extending, for an additional period of one year, the interim ordinance adopting Appendix B to the City of Brentwood Residential Design Guidelines to Implement Interim Residential Objective Design Standards, and finding the action exempt from CEAQ.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, Tony Oerlemans, Council Member, and Joel Bryant, Mayor
Motion Approved (5 to 0)
H. BUSINESS ITEMS
H.1 Extension of Urgency Ordinance and Introduction and Waiver of First Reading of a Permanent Ordinance Implementing a Modification to the Brentwood Municipal Code to allow Pad-Mounted Transformers within Development Projects.

Staff withdrew the extension of the Interim Urgency Ordinance, which will be considered at a future date.

Allen Baquilar, Director of Engineering/City Engineer presented the item.

Mayor Bryant opened the public comment period.

There being no one else wishing to speak, Mayor Bryant closed the public comment period.

Moved by: Jovita Mendoza, Council Member
Seconded by: Susannah Meyer, Vice Mayor
The City Council continued to a special or regular meeting the consideration of a Permanent Ordinance Implementing a modification to the Brentwood Municipal Code that would allow permittees to install pad-mounted transformers within the development projects.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, Tony Oerlemans, Council Member, and Joel Bryant, Mayor
Motion Approved (5 to 0)

Page 10 of 244 ends

7 H.2 Update of Parks and Recreation Special Event Process, Consideration of Future New Fees for Special Events, and provide direction to staff Thien Nguyen, Recreation Manager presented the item.

Mayor Bryant opened the public comment period.

Amy Tilley spoke in support of the item as presented.

Cheyenne Erickson spoke in support of the item as presented.

Vinoy Mereddy provided comments and inquiries on the item.

There being no one else wishing to speak, Mayor Bryant closed the public comment period.

Moved by: Jovita Mendoza, Council Member
Seconded by: Pa'tanisha Pierson, Council Member
The City Council, by motion, directed staff to implement the process outlined in the staff report.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, Tony Oerlemans, Council Member, and Joel Bryant, Mayor
Motion Approved (5 to 0)
H.3 Memorandum of Understanding between the City and the Downtown Brentwood Coalition for downtown district programming and management services
Abraham Salinas, Senior Analyst, presented item.

Mayor Bryant opened the public comment period.

Amy Tilley spoke in favor of the item.

Peter Jacoway spoke in favor of the item.

There being no one else wishing to speak, Mayor Bryant closed the public comment period.

Moved by: Pa'tanisha Pierson, Council Member
Seconded by: Tony Oerlemans, Council Member
Adopted Resolution 2024-45 approving a Memorandum of
Understanding (MOU) between the City and the Downtown Brentwood Coalition for the delivery of downtown programming and management services for fiscal years 2024/25 and 2025/26 not to exceed $160,000.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, Tony Oerlemans, Council Member, and Joel Bryant, Mayor

Page 11 of 244 ends

8 Motion Approved (5 to 0)
H.4 Creation of the Brentwood Municipal Code Review Committee Tim Ogden, City Manager, presented the item.

Mayor Bryant opened the public comment period.

There being no one else to speak on the item, Mayor Bryant closed the public comment period.

Moved by: Pa'tanisha Pierson, Council Member
Seconded by: Tony Oerlemans, Council Member
The Council, by motion, approved the creation of the Brentwood Municipal Code Review Committee, and accepted the scope as follows:

The committee will review the City’s municipal code, and make recommendations to staff on updates that may be needed. This committee will meet bi-annually on the 2nd Wednesday in July and January at 5:30 PM, with special meetings as needed. The Council appointed Council Member Pierson and Council Member Oerlemans, and requested the Planning Commission appoint one of its members as an advisory member to the committee.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, Tony Oerlemans, Council Member, and Joel Bryant, Mayor
Motion Approved (5 to 0)
I. REQUEST FOR FUTURE AGENDA ITEMS - NEW REQUEST(S)
There were no new requests for future agenda items.

J. REQUESTED FUTURE AGENDA ITEM(S)
J.1 Consider a request from Vice Mayor Meyer related to an overview of the City’s economic development efforts
Vice Mayor Meyer presented the item.

Mayor Bryant opened the public comment period.

There being no one wishing to speak on the item, Mayor Bryant closed the public comment period.

Moved by: Susannah Meyer, Vice Mayor
Seconded by: Pa'tanisha Pierson, Council Member
The City Council, by motion, directed staff to spend time and resources to provide an update on economic development efforts, including the Innovation Center website.

Page 12 of 244 ends

9 Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, Tony Oerlemans, Council Member, and Joel Bryant, Mayor
Motion Approved (5 to 0)
J.2 Consider a request from Council Member Mendoza related to traffic on Minnesota Avenue
Council Member Mendoza presented the item.

Mayor Bryant opened the public comment period.

There being no one wishing to speak on the item, Mayor Bryant closed the public comment period.

Moved by: Jovita Mendoza, Council Member
Seconded by: Susannah Meyer, Vice Mayor
The City Council, by motion, directed staff to spend time and resources to replicate the traffic analysis and improvement efforts that were used on Vineyards Parkway, and to include the schools to find a solution for traffic issues.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, Tony Oerlemans, Council Member, and Joel Bryant, Mayor
Motion Approved (5 to 0)
J.3 Consider a request from Council Member Mendoza related to letters of support or opposition to California state legislation
Council Member Mendoza presented the item.

Mayor Bryant opened the public comment period.

There being no one else to speak on the item, Mayor Bryant closed the public comment period.

Moved by: Jovita Mendoza, Council Member
Seconded by: Susannah Meyer, Vice Mayor
The City Council, by motion, authorized staff to spend time and resources to send letters regarding the following legislation: a letter in support of AB 3233 (Weiner); in opposition to AB 1893 (Wicks), and in opposition to AB 2560 (Alvarez), with the letters to clarify that position of the City of Brentwood is current as of the date of the letter. Staff will likewise send letters regarding other legislation, as authorized by the Signature Policy.

Page 13 of 244 ends

10 Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, Tony Oerlemans, Council Member, and Joel Bryant, Mayor
Motion Approved (5 to 0)
K. ADJOURNMENT
It was moved/seconded by Vice Mayor Meyer/Council Member Pierson to adjourn the meeting at 10:08 p.m. in honor of longtime Brentwood resident, Helen Myers, and carried unanimously.

Page 14 of 244 ends

1 SPECIAL CITY COUNCIL MINUTES
April 30, 2024, 5:30 p.m.

A. CALL TO ORDER & ROLL CALL
Mayor Bryant called the meeting to order at 5:36 p.m.

Roll Call found the following members present: Mendoza, Meyer, Pierson, Oerlemans, and Mayor Bryant.

B. PLEDGE OF ALLEGIANCE
Mayor Bryant led the Pledge of Allegiance.

C. BUSINESS ITEMS
C.1 Discuss Possible New Tobacco Regulations and Provide Direction to Staff
Following the presentation of the staff report, Mayor Bryant opened the public comments section.

Michelle Gallardo submitted, by email, a letter of support for staff recommendations.

Clay Hawley, Brian Davis, Blythe Young, Zain Memon, Rod Flohr, Carolina Villaseca, Mayra Lopez spoke in support of a Tobacco Retail License and provided feedback on the options provided to Council.

There being no one else wishing to speak, the public comment period was closed.

Moved by: Jovita Mendoza, Council Member
Seconded by: Pa'tanisha Pierson, Council Member
The City Council directed staff to draft an Ordinance for Council consideration to include the following:

1. Implementing a local tobacco retail license (TRL) system, including maximum amount that can be charged, and
how those fees will be spent: 'Implement a local TRL, which includes (a) a system of 2 compliance checks plus one decoy within each 12 month period, (b) revocation on the third violation within five year period, (c) imposition of fines at the highest level allowed by law, (d) suspension periods for violations consistent with model ordinance's first two violations

Page 15 of 244 ends

2 2. 100% flavor ban on tobacco sales: Yes, include in TRL, as set out in state law

3. Prohibiting vaping product sales: 'Yes, include in TRL, as set out in state law

4. Maximum distance between tobacco retailers and schools that’s allowed by law: Require at least 500 feet between tobacco retailers and youth-oriented facilities. No TRL shall be renewed if business is noncompliant with new regulations after one year (with possibility of one year longer with demonstration of hardship). Modify 'youth-oriented facilities' definition to (a) remove kindergarten, playground open to public, recreation facility open to the public, parks, childcare facilities/preschools; (b) change youth center ages to 11-17.

5. Minimum sales sizes (e.g. pack/carton): Require minimum pack size as set out in model ordinance.

6. Strictest laws for proximity between retailers: Copy item number 4. Staff to research various methodologies (e.g., scorecard, lottery, other system used by other cities) for Council to consider to choose amongst retailers located within 500' of each other.

7. All tobacco sales banned at pharmacies: Yes, ban tobacco sales at all pharmacies.

8. Working with law enforcement on decoy purchasers:

Implement compliance checks (two per year) and a decoy
operation involving law enforcement.

9. Any way to retroactively revoke licenses (if applicable):

Since the City currently has no TRL, this is not applicable.

10.Minimum prices on tobacco: $10 per package of 20
cigarettes, package of little cigars, and per cigar.

11.Prohibit coupons/discounts: Yes, prohibit coupons and discounts in TRL ordinance.

12.Cap on smoke shops and tobacco retailers in total: No more than 42 licenses shall be issued.

13.DOJ grants to support code enforcement: Staff is directed to research and apply for applicable grants.

14.Require CUP for tobacco sales: No CUP to be required; TRL will be regulatory method.

15.Potential penalties available: Penalties will include fines and possibility of suspension and/or revocation of TRL license for violations. Fines shall be set in an amount sufficient to cover

Page 16 of 244 ends

3 staff time. Fines may be used for educational purposes and/or additional enforcement. Staff to research how partnering with third parties to complete inspections may be feasible.

16.Bring other best practices from other cities for Council consideration: Only as directed above.

17.Additional Information Requested by LUD: Provide
recommendations on how to regulate sign content within
the law. Prohibit the sale of drug paraphernalia in TRL:
(1) Use outside counsel to draft TRL ordinance, (2) prohibit the sale of drug paraphernalia
Ayes (4): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Pa'tanisha Pierson, Council Member, and Joel Bryant, Mayor Noes (1): Tony Oerlemans, Council Member
Motion Approved (4 to 1)
C.2 Discussion and direction on the Vineyards at Marsh Creek - Event Center/Amphitheater Phase I, CIP No. 337-37231, and associated funds.

Following the presentation of the staff report, Mayor Bryant opened the public comments period.

Joe Young and John Tomei submitted written public comments by email.

Joe Young, representing Vineyards at Marsh Creek Owners Association, spoke to the City Council and expressed concerns about impacts to homeowners. (see written statement)
Carolina Villaseca, resident, spoke about the need for space for local drama/music clubs to perform.

Rod Flohr, resident, expressed disappointment in a sized down project, and felt there should be more of an effort to preserve a footprint for a full facility, and spoke in support of Option C but to build out the full parking lot.

There being no one else wishing to speak, the public comment period was closed.

Moved by: Pa'tanisha Pierson, Council Member
Seconded by: Jovita Mendoza, Council Member
Received an update on the Vineyards at Marsh Creek - Event Center/Amphitheater Phase I, CIP No. 337-37231, (“Project”), discuss and provided the following direction to staff:

The City Council, by motion, provided the following direction to staff:

Page 17 of 244 ends

4  Research (a) availability of using existing Public Art funds for amphitheater/performance arts purposes, or, if necessary (b) possibility of amending Public Art ordinance to allow existing funds to be used for amphitheater/performance arts purposes  Work with consultant on developing new concept that would include, within currently available project budget for Option C:
o Stage in upper area in a location that is sensitive to noise impacts
o Removal of wedding pavilion
o Lights to allow use of facility at night
o Area for food trucks to come and go (not be permanently parked)
o Possibility of use by operations such as Farmers’ Market when not in use for performances
o Analysis of impacts of (a) noise and (b) light of siting performance area at top of site
o Seating for facility users (not solely lawn seating) – as art pieces?
o Evaluation of ADA considerations for both upper phase and lower phase
o Evaluation of parking needs based on new vision – consider same types of parking as used in Sand Creek sports complex o Break down cost by phase and amenity (as was done for Sand Creek sports complex)
o Preserving lower area for development of full amphitheater in the future, as funds allow
o Removal of art pieces and repurposing of funds for
performance arts
o Accept public comment in the course of next City Council meeting at which this is considered
Council will reassess after evaluating this new concept. Bring back to Council as soon as ready for review.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Vice Mayor, Tony Oerlemans, Council Member, Pa'tanisha Pierson, Council Member, and Joel Bryant, Mayor
Motion Approved (5 to 0)

Page 18 of 244 ends

5 D. ADJOURNMENT
It was moved/seconded by Meyer/Mendoza to adjourn at 10:23 p.m. Motion carried with Mendoza, Meyer, Oerlemans, Pierson, and Mayor Bryant in favor.

Page 19 of 244 ends

PROCLAMATION
WHEREAS, Memorial Day is a time to remember the valor and sacrifice of the men and women who have given their lives in service to our nation; and
WHEREAS, the tradition of Memorial Day began in the aftermath of the Civil War, and was originally known as Decoration Day, a time set aside to decorate the graves of those who died in the war; and WHEREAS, this day has since been expanded to honor all Americans who have died while in military service, serving as a poignant reminder of the cost of freedom and the bravery of those who protect it; and WHEREAS, it is essential that we remember and honor these heroes who have fallen, ensuring their bravery and stories are not forgotten amidst the passage of time; and
WHEREAS, this solemn holiday offers an opportunity for the community to come together in remembrance and gratitude for those who have made the ultimate sacrifice; and
WHEREAS, it is fitting that as a community and nation, we set aside this day to reflect on the values of courage, commitment, and the fierce dedication to our country demonstrated by these servicemen and women; and NOW, THEREFORE, BE IT PROCLAIMED that the City Council
of the City of Brentwood does hereby recognize the May 27, 2024, as

MEMORIAL DAY
and urges all Brentwood residents to observe this day with appropriate ceremonies and activities that honor and remember those who have courageously laid down their lives for the peace and security of our country.

Dated this 14th day of May 2024

Joel R. Bryant, Mayor

Page 20 of 244 ends

PROCLAMATION
WHEREAS, the United States Armed Forces, consisting of the Army, Navy, Marine Corps, Air Force, Space Force, and Coast Guard, serve to protect our nation, its interests, and its allies with honor, valor, and integrity; and WHEREAS, the members of our Armed Forces demonstrate
unparalleled commitment and sacrifice, embodying the highest standards of service and dedication to our nation and its principles; and WHEREAS, Armed Forces Week is an annual observance allowing citizens across the nation to express their gratitude and appreciation for the service and sacrifices of our military personnel and their families; and WHEREAS, we must acknowledge and celebrate the hard work, dedication, and patriotic duty of the men and women who wear the uniform of the U.S. Armed Forces; and
WHEREAS, through their unwavering commitment, these brave individuals ensure our safety and security, often placing themselves in harm’s way to protect the freedoms we hold dear; and
WHEREAS, this week-long observance offers an opportunity for communities, schools, and organizations to engage in activities that show support for our troops and to educate our citizens about the military’s role in national security and civic life; and
NOW, THEREFORE, BE IT PROCLAIMED that the City Council
of the City of Brentwood does hereby recognize the May 13 – 18, 2024, as

ARMED FORCES WEEK
and call upon all Brentwood residents to join in showing our heartfelt appreciation and steadfast support for our military men and women.

Dated this 14th day of May 2024

Joel R. Bryant, Mayor

Page 21 of 244 ends

PROCLAMATION
WHEREAS, public works professionals focus on infrastructure, facilities, and services that are of vital importance to sustainable and resilient communities and to the public health, high quality of life, and well-being of the people of Brentwood; and
WHEREAS, these infrastructure, facilities, and services could not be provided without the dedicated efforts of public works professionals, who are engineers, managers, and employees, responsible for rebuilding, improving, and protecting our city’s transportation, water supply, water treatment, solid waste systems, public buildings, and other structures and facilities essential for our residents; and
WHEREAS, it is in the public interest for the residents, civic leaders, and children in Brentwood to gain knowledge of and to maintain a progressive interest in the public works needs and programs of their respective communities; and
WHEREAS, the theme, “Advancing Quality of Life for All”, shines a spotlight on the way public works professionals advance our quality of life, whether as a first responder to a water main break, regular waste pickup, or a myriad of other ways they silently serve their communities.

NOW, THEREFORE, BE IT PROCLAIMED that the City Council
of the City of Brentwood does hereby recognize the May 19 – 25, 2024, as

PUBLIC WORKS WEEK
and calls upon all Brentwood residents to join in showing our heartfelt appreciation and steadfast support for our military men and women.

Dated this 14th day of May 2024

Joel R. Bryant, Mayor

Page 22 of 244 ends

CITY COUNCIL AGENDA ITEM NO. E.7
05/14/2024
SUBJECT: Amendment to Council/Administrative Policy No. 30-1 (Appointment of Planning Commission Members) to be consistent with current practices.

DEPARTMENT: Community Development Department
STAFF: Alexis Morris, Director of Community Development Erik Nolthenius, Planning Manager

TITLE/RECOMMENDATION
Adopt a resolution amending Council/Administrative Policy No. 30-1 (Appointment of Planning Commission Members) to be consistent with current practices.

FISCAL IMPACT
Not Applicable.

BACKGROUND
Council/Administrative Policy No. 30-1 was originally adopted by the City Council in 1983 to provide for the appointment and composition of the Planning Commission.

It was amended in 2006 to account for instances when a Commissioner’s term expires but a successor has not yet been appointed. Since that time, changes have been made to the Planning Commission appointment process, including clarifications to the means of selecting and interviewing candidates, adopted by the City Council in February 2021, which was amended December of 2023 (see Attachment 2).

Staff recommends that the policy be amended at this time to be consistent with current practices, including the City Council process for interviewing prospective Commissioners, as well as the City Council process for removing current Commissioners. These changes are reflected in Exhibit A to the attached draft resolution for the City Council’s review.

CITY COUNCIL STRATEGIC INITIATIVE
Not Applicable.

Page 23 of 244 ends

CITY COUNCIL AGENDA ITEM NO. E.7
05/14/2024

PREVIOUS ACTION
Previous Action by the City Council is included on Attachment 1.

DATE OF NOTICE
Not Applicable.

ENVIRONMENTAL DETERMINATION
Not Applicable.

ALTERNATIVE OPTION(S)
Alternative options to staff’s recommendation:

1. Do not approve staff’s recommended changes.

2. Modify staff’s recommended changes based on discussion.

3. Continue item with direction for staff to return with additional information.

ATTACHMENT(S)

1. Previous Action

2. Planning Commissioner Candidate Selection, Interview, and Appointment Process (February 2021 and Amended December 2023)

3. Draft resolution amending Council/Administrative Policy No. 30-1

Page 24 of 244 ends

PREVIOUS ACTION(S)
Previous actions related to this agenda item that were taken by the City Council are listed below. To view prior actions and materials, and Brentwood Municipal Code references in the staff report, as applicable:

Visit www.brentwoodca.gov/meetings, and select the meeting date(s) desired to see the reference materials and videos.

Visit www.brentwoodca.gov/municipalcode to research references to the Brentwood Municipal Code and search by the code section(s) cited.

On September 13, 1983, the City Council adopted Resolution No. 83-44, adopting Council/Administrative Policy No. 30-1 to provide for the appointment and composition of the Planning Commission.

On January 10, 2006, the City Council adopted Resolution No. 2006-005, amending Council/Administrative Policy No. 30-1 to account for instances when a Commissioner’s term expires but a successor has not yet been appointed.

On February 9, 2021, the City Council, by motion, approved a selection, interview, and appointment process for Planning Commission applicants.

On December 12, the City Council, by motion, directed staff to amend the process for selections and interviews, to include amendments to the process including: The Mayor and each Council member will email their individual selections to the City Clerk. Each Council Member will submit up to three (3) questions, in order of preference to the City Clerk no later than twenty-four (24) hours before the special meeting. For meetings held in person, the applicants will be seated in a room where there is not audio/video of the City Council meeting; and be brought in to the public meeting in sequence. The order of sequence will be randomly selected by the City Clerk drawing names.

Page 25 of 244 ends

Planning Commissioner Candidate Selection, Interview, and Appointment Process
As adopted by the City Council February 9, 2021,
Revised on December 12, 2023.

1. Selection of applicants to be interviewed
a. Unless an applicant has withdrawn their application, a compilation of all received applications will be provided to the City Council. b. The Mayor and City Council members will each choose up to five (5) candidates to be interviewed from among the applications submitted.

The Mayor and each Council member will email their individual selections to the City Clerk. Each applicant that is selected by at least two (2) Mayor/Council members will be advanced for an interview. c. In the alternative to Section 1.b., the Mayor and City Council may agree to interview all applicants for a particular commission.

2. Interviews
a. Regular or special meetings may be held for the interview and/or selections of applicants or each commission. Unless the number of candidates otherwise permits, there will be one meeting for each commission.
b. The purpose of each meeting is to allow City Council members to interview applicants, to provide recommendations to the Mayor on who could be considered for appointment, and for the City Council to consider approval of the Mayor's recommended appointees.
c. Each special meeting will be held in-person or virtually, and will be properly noticed and open to the public. Redacted applications and resumes of each applicant will be attached to the meeting agenda. d. Public comment will be received on the special meeting’s agenda item. e. For virtual meetings, at the meeting’s start, the applicants will be in a separate private “room” or “lobby” (without access to the video or audio of the public meeting); for meetings held in person, the applicants will be seated in a room where there is not audio/video of the City Council meeting; and be brought in to the public meeting in sequence. (The order of sequence will be randomly selected by the City Clerk drawing names.)
f. The Mayor and each Council Member will have the opportunity to ask one (1) question each of the applicants. Each Council Member will submit up to three (3) questions, in order of preference to the City Clerk no later than twenty-four (24) hours before the special meeting. In case of multiple Council Members having the same first or second preference question, a second or third preference question may be used. The City Clerk will review the final questions with the City Manager or designee

Page 26 of 244 ends

to ensure there are no duplicate questions. The questions will not be shared with other Council Members prior to the meeting. The same questions must be asked of all applicants. Each applicant will be limited to three (3) minutes for each question. Limited follow up questions may be permitted by the Mayor, based on available time.

3. Appointments
a. After all interviews are complete, the Mayor, with the assistance of the City Clerk, will poll the City Council members on their top two choices, in order from first to last. The Mayor will then state his or her top two choices, in order of first to last, indicating which applicant(s) will be appointed to a full term, or to complete an unexpired term, if applicable, and submit them to the City Council for approval.
b. Following submittal of the Mayor’s recommended applicant(s), there will be City Council discussion and then a vote on each applicant, until all open seats are filled. If an applicant receives the majority of the City Council votes (including those of the Mayor), then they are approved. If any applicant does not receive a majority vote, they are not selected, and the Mayor could either make another recommendation, or ask staff to advertise the Commission opening(s) again, seeking additional applicants.

Page 27 of 244 ends

CITY COUNCIL RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRENTWOOD AMENDING COUNCIL/ADMINISTRATIVE POLICY NO. 30-1
(APPOINTMENT OF PLANNING COMMISSION MEMBERS) TO BE

CONSISTENT WITH CURRENT PRACTICES
WHEREAS, on September 13, 1983, the City Council adopted Resolution No. 83-44, adopting Council/Administrative Policy No. 30-1 to provide for the appointment and composition of the Planning Commission; and WHEREAS, on January 10, 2006, the City Council adopted Resolution No. 2006-005, amending Council/Administrative Policy No. 30-1 to account for instances when a Commissioner’s term expires but a successor has not yet been appointed; and
WHEREAS, on February 9, 2021, the City Council clarified the process for the selection of Planning Commission applicants to be interviewed, interviews, and appointment; and
WHEREAS, on December 12, 2023, the City Council amended the process for selections and interviews, to include amendments to the process including: The Mayor and each Council member will email their individual selections to the City Clerk Each Council Member will submit up to three (3) questions, in order of preference to the City Clerk no later than twenty-four (24) hours before the special meeting. For meetings held in person, the applicants will be seated in a room where there is not audio/video of the City Council meeting; and be brought in to the public meeting in sequence. The order of sequence will be randomly selected by the City Clerk drawing names; and
WHEREAS, the current policy does not account for the City Council process for interviewing prospective Commissioners, nor the City Council process for removing current Commissioners.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Brentwood does hereby amend Council/Administrative Policy No. 30-1 as reflected in the attached Exhibit A, with text to be added underlined and text to be deleted in strikethrough.

PASSED, APPROVED AND ADOPTED by the City Council of the City of Brentwood at a regular meeting held on the 14th day of May, 2024, by the following vote:

Page 28 of 244 ends

EXHIBIT A

COUNCIL/ADMINISTRATIVEPOLICY
Subject: Policy No: 30-1 Date: 5/14/24 1/10/06

APPOINTMENT OF PLANNING

COMMISSION MEMBERS
Resolution No. 2024-XXX
2006-006

Page 1 of 1 ends

PURPOSE:

To provide for the appointment and composition of the Planning Commission of the City of Brentwood.

POLICY:

1. The Planning Commission shall consist of five (5) members who shall be appointed by the Mayor, with the approval of the City Council, and through an interview process that includes the City Council, for a term of two (2) years and thereafter until their respective successors are appointed and qualified. Appointees filling vacancies occurring during a regular term shall serve the remainder of the term of the preceding appointee.

2. All Each person appointed to the Planning Commission shall be a resident of the City.

3. At least one (1) month prior to the expiration of the term of a member, the City shall publish a notice of public hearing for the purpose of soliciting candidates for the Commission, in addition to incumbent appointees who may have indicated a desire to be considered for reappointment.

4. Candidates, other than incumbents, must submit an application, obtained from City Hall, for consideration by the City Council. Once appointment(s) are made, applications will not remain on file, and unsuccessful candidates should reapply for consideration of future vacancies.

5. An appointee member of the Commission may be removed at any time by a majority vote of the City Council, or by the Mayor, subject to approval of the City Council.

6. Should a position on the Commission become vacant other than by expiration of a normal term, the City Council may fill the vacancy without regard to the provisions of this policy requiring public notice.

CITY OF BRENTWOOD

Page 29 of 244 ends

CITY COUNCIL AGENDA ITEM NO. E.8
05/14/2024
SUBJECT: Award of Agreement for Architectural Services to Advance Design Consultants, Inc. for the Water and Wastewater Laboratory Project, CIP Project No. 592-59207.

DEPARTMENT: Public Works
STAFF: Casey Wichert, Director of Public Works
Vatsal Patel, Engineering Manager
Renee Payette, Project Services Specialist

TITLE/RECOMMENDATION
Adopt a Resolution approving and authorizing the City Manager or designee to execute an Agreement for Architectural Services with Advance Design Consultants, Inc. (“ADC”) in the amount of $279,330, plus funding authorization for a 15% contingency of $41,899.50, for a total funding authorization not to exceed amount of $321,229.50, for the Water and Wastewater Laboratory Project, CIP Project No. 592- 59207 (“Project”).

FISCAL IMPACT
The total funding authorization for architectural design services with ADC is $321,229.50, which includes a 15% contingency.

The funds for this Project and work per the attached Agreement for Architectural Services are included in the adopted 2023/24 – 2027/28 Capital Improvement Program (“CIP”). This Project is funded by Water Enterprise and Wastewater Enterprise Funds.

BACKGROUND
This Project will provide a new, larger laboratory for the water and wastewater systems. The existing laboratory, which was constructed in 2002, is outdated and has outgrown its footprint, and the building is not readily expandable. Constructing a new laboratory and converting the existing laboratory to office space will provide adequate space for build-out of the City.

Page 30 of 244 ends

CITY COUNCIL AGENDA ITEM NO. E.8
05/14/2024
Staff prepared the necessary Request for Proposals (“RFP”) for Architectural Design Services (“Services”) and advertised it in the local paper, on the City website, via builders’ exchanges and on Public Purchase. The RFP was available for approximately four weeks and staff received five proposals.

Public Works and Engineering staff evaluated the proposals based upon the RFP criteria and selected ADC as the most qualified firm to provide these Services. Staff has negotiated a scope of work and cost proposal with ADC to provide these Services consistent with the Project requirements.

Staff recommends approval of the Agreement for Architectural Services with ADC for this Project.

CITY COUNCIL STRATEGIC INITIATIVE
Not Applicable.

PREVIOUS ACTION
Previous Action by the City Council is included on Attachment 1.

ENVIRONMENTAL DETERMINATION
CEQA work is ongoing and will be done concurrently with the architectural design process. A determination is expected to be brought to the City Council prior to awarding a contract for construction.

ALTERNATIVE OPTION(S)
Alternative Options to the Staff Recommendation:

1. Do not approve staff’s recommendation.

2. Modify staff’s recommendation based on legally defensible findings.

3. Continue item with direction for staff to return with additional information.

ATTACHMENT(S)

1. Previous Action

2. Resolution

3. Agreement for Architectural Services

4. CIP Project Sheet

Page 31 of 244 ends

Attachment 1

PREVIOUS ACTION
Previous actions related to this agenda item that were taken by the Council are listed below. To view prior actions and materials, and Brentwood Municipal Code references in the staff report, as applicable:
 Visit www.brentwoodca.gov/meetings, and select the meeting date(s) desired to see the reference materials and videos.
 Visit www.brentwoodca.gov/municipalcode to research references to the Brentwood Municipal Code and search by the code section(s) cited.

On June 13, 2023, by Resolution No. 2023-80, the City Council adopted the 2023/24 – 2027/28 Capital Improvement Program, which included the Project.

Page 32 of 244 ends

RESOLUTION NO. 2024-XX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

BRENTWOOD APPROVING AND AUTHORIZING THE CITY

MANAGER OR DESIGNEE TO EXECUTE AN AGREEMENT FOR

ARCHITECTURAL SERVICES WITH ADVANCE DESIGN
CONSULTANTS, INC. IN THE AMOUNT OF $279,330, PLUS
FUNDING AUTHORIZATION FOR A 15% CONTINGENCY OF
$41,899.50, FOR A TOTAL FUNDING AUTHORIZATION NOT TO
EXCEED AMOUNT OF $321,229.50, FOR THE WATER AND
WASTEWATER LABORATORY PROJECT, CIP PROJECT NO. 592-
59207.

WHEREAS, on June 13, 2023, by Resolution No. 2023-80, the City Council adopted the 2023/24 – 2027/28 Capital Improvement Program, which included the Water and Wastewater Laboratory Project, CIP Project No. 592-59207 (“Project”); and
WHEREAS, this Project will provide a new, larger laboratory for the water and wastewater systems; and
WHEREAS, the existing laboratory, which was constructed in 2002, is outdated and has outgrown its footprint, and the building is not readily expandable; and
WHEREAS, constructing a new laboratory and converting the existing laboratory to office space will provide adequate space for build-out of the City; and WHEREAS, staff prepared the necessary Request for Proposals (“RFP”) for Architectural Design Services (“Services”) and advertised it in the local paper, on the City website, via builders’ exchanges and on Public Purchase; and WHEREAS, the RFP was available for approximately four weeks and staff received five proposals; and
WHEREAS, Public Works and Engineering staff evaluated the proposals based upon the RFP criteria and selected Advance Design Consultants, Inc. (“ADC”) as the most qualified firm to provide these Services; and
WHEREAS, staff has negotiated a scope of work and cost proposal with ADC to provide these Services consistent with the Project requirements.

NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Brentwood does hereby adopt a Resolution approving and authorizing the City Manager or designee to execute an Agreement for Architectural Services with Advance Design Consultants, Inc. in the amount of $279,330, plus funding

Page 33 of 244 ends
Page 2 of 2 ends

authorization for a 15% contingency of $41,899.50, for a total funding authorization not to exceed amount of $321,229.50, for the Water and Wastewater Laboratory Project, CIP Project No. 592-59207.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Brentwood at a regular meeting held on the 14th day of May 2024 by the following vote:

Page 34 of 244 ends

City Attorney Approved Version 040821 1

AGREEMENT FOR ARCHITECTURAL SERVICES
Advance Design Consultants, Inc.

THIS AGREEMENT FOR ARCHITECTURAL SERVICES (“Agreement”) is made and entered into as of the _____ day of __________________, 2024 by and between the City of Brentwood, a municipal corporation of the State of California ("City"), and Advance Design Consultants, Inc., a C Corporation ("Architect") (each a “Party” and collectively, the “Parties”).

RECITALS
A. City does not have available personnel specifically trained and experienced to perform the architectural services required and requires the professional services of an individual or business entity with the necessary license, qualifications and experience to provide architectural services for the City’s Water and Wastewater Laboratory Project, CIP Project No. 592-59207 (the “Project”).

B. Architect has the necessary license, professional skills and experience necessary to perform the architectural services described in this Agreement, and as further described in Exhibit A to this Agreement (“Exhibit A”), and in the City’s Request for Proposals for architectural Services for the Project, dated January 5, 2024 (“RFP”), attached as Exhibit B, both of which exhibits are incorporated herein.

C. City desires to engage Architect to provide these architectural services by reason of its qualifications and experience in performing such services.

D. Architect has submitted a proposal to City, dated February 9, 2024 (“Proposal”), attached as Exhibit C and incorporated herein, in response to the City’s RFP, and has affirmed its willingness and ability to provide such Architectural services on the terms and manner set forth in this Agreement.

NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, the Parties agree as follows:

1. Definitions. The following definitions apply to the body of this Agreement and Exhibit A unless otherwise indicated. Defined terms are capitalized in the Agreement with the exception of the words “day” and “including.”

1.1 Additional Services means Architectural services in addition to the Basic Services, which are provided pursuant to the City’s written request or prior written authorization.

1.2 Basic Services means those Architectural services necessary for design and construction of the Project, as specified in Exhibit A and in the RFP and Proposal.

1.3 Change Order means a written document approved and signed by the City after execution of the Construction Contract, which changes the scope of Work, the Construction Contract Price, or the Construction Contract Time.

1.4 City Engineer means the current or acting City Engineer and Director of Public Works for the City of Brentwood or his or her authorized delegee.

1.5 Construction Contract means the signed agreement between the City and Contractor, which includes and incorporates the Construction Documents.

1.6 Construction Contract Price means the total compensation to be paid to the Contractor for performance of the Work, as set forth in the Construction Contract.

1.7 Construction Contract Time means the time within which the Contractor is required to perform the Work, as set forth in the Construction Contract and as may be amended by Change Order.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 35 of 244 ends

City Attorney Approved Version 040821 2

1.8 Construction Documents means all of the documents that are prepared following approval of the Design Development Documents for bidding and construction of the Project, as further detailed in Exhibit A.

1.9 Contractor means the individual, partnership, corporation, or other entity which has signed the Construction Contract with the City to perform the Work. “Contractor” includes the Contractor’s subcontractors, unless the context indicates otherwise.

1.10 Day means a calendar day unless otherwise specified.

1.11 Design Development Documents means detailed documents which are prepared following approval of the Schematic Design Documents, as further detailed in Exhibit A.

1.12 Design Documents means, collectively, the plans, drawings and specifications prepared or provided by the Architect for the Project at all design stages, including Schematic Design Documents, Design Development Documents and Construction Documents.

1.13 Including, whether or not capitalized, means “including; but not limited to” unless the context requires otherwise.

1.14 Project Manager means the City employee or representative with primary responsibility for overseeing design and construction of the Project and who will be Architect’s sole point of contact for the City unless otherwise stated. The Project Manager for this Project is Vatsal Patel.

1.15 Project Schedule means the detailed schedule developed by the Architect, and subject to the City’s approval, for design and construction of the Project, based on the Proposed Project Schedule provided in Exhibit A.

1.16 Proposed Project Schedule means the proposed Project schedule provided by the City in Exhibit A to this Agreement.

1.17 Rate Schedule means the schedule listing the hourly rates for Architect’s staff and rates for costs associated with providing the Services. The Rate Schedule is included in the Proposal.

1.18 Schematic Design Documents means preliminary drawings and related documents showing the Project’s basic components, scale and location, as further detailed in Exhibit A.

1.19 Services means all architectural and related services required under this Agreement, including all Basic Services and any authorized Additional Services.

1.20 Work means the Contractor’s construction and services necessary or incidental to constructing the Project in conformance with the requirements of the Construction Documents.

2. Scope of Services. Architect, acting in its capacity as an architect licensed under California law, will provide the Basic Services necessary to design and construct the Project in accordance with the City’s requirements, as set forth in Part One – Scope of Services in Exhibit A, and will provide those Additional Services, if any, as requested and authorized in writing by the City.

3. Personnel and Subconsultants. Architect will be responsible for employing or engaging all persons necessary to perform the Services. Architect will control the manner and means of the services to be performed by its employees and subconsultants. All of Architect's staff will be qualified by training and experience to perform their assigned tasks. Architect will give its personal attention to the fulfillment of the provisions of this Agreement by all of its employees and Architect, if any, and will keep the Services under its control. On demand of City, if any employee or Architect fails or refuses to carry out the provisions of this Agreement or appears to be incompetent or to act in a disorderly or improper manner, he or she will be discharged immediately from the Services.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 36 of 244 ends

City Attorney Approved Version 040821 3

3.1 Architect’s Key Personnel. The Architect’s key personnel assigned to this Project, as specified in Architect’s Proposal, may not be changed without the prior written approval of the City. Architect must promptly notify the City in writing of any changes or proposed changes to the key personnel identified in the Proposal (or subsequently approved by the City), and of any changes to the contact information (telephone and email) for any key personnel.

3.2 Architect’s Principal Representative. Architect’s principal representative assigned to this Project is Lorenzo R. Rios, Principal, who will have full authority from Architect to receive and act on instructions from the City.

3.3 Subconsultants. Architect may not engage the services of any subconsultant for this Project, including, but not limited to, firms or individuals providing specialized architectural or engineering services, without obtaining the City’s prior written approval. The City’s approval must not be deemed to create any contractual relationship between the City and any such subconsultant, except that the City must be considered a third party beneficiary of such services for the Project. Architect must bind its subconsultants in the same manner as Architect is bound to the City under this Agreement, including, but not limited to, the insurance and indemnity requirements.

3.4 Warranty of Qualifications. Architect warrants and represents that Architect, its personnel, and its subconsultants are each duly qualified, licensed, and authorized by law to perform the Architectural and related services required under this Agreement.

4. Standard of Performance. Architect acknowledges that in entering into this Agreement the City is relying on Architect's special Architectural skills and experience to do and perform the Services. The Services provided by Architect pursuant to this Agreement must, at all times, meet or exceed the standard of care applicable to experienced, licensed civil engineers performing similar work in the area in which the Project is located. Similarly, the Services provided by any subconsultant must meet or exceed the standard of care applicable to others practicing in the subconsultant’s field and performing similar work in the area in which the Project is located. The acceptance of the Services by City does not release Architect from these obligations.

5. Term. Unless earlier terminated, the term of this Agreement will commence upon the date first above written and will expire upon completion of the Services by Architect.

6. Schedule.

6.1 Time is of the essence for providing the Services. Architect will generally adhere to the approved Project Schedule provided, that City will grant reasonable extensions of time for the performance of the Services occasioned by unusually lengthy governmental reviews of Architect’s work product or other unavoidable delays occasioned by unforeseen circumstances; provided, further, that such unavoidable delay will not include strikes, lockouts, work stoppages, or other labor disturbances conducted by, or on behalf of, Architect’s officers or employees.

6.2 Architect acknowledges the importance to City of City’s Project Schedule and agrees to put forth its best professional efforts to perform the Services in a manner consistent with that schedule.

City understands, however, that Architect’s performance must be governed by sound practices. Architect will work such overtime or engage such personnel and equipment as necessary to maintain the schedule, without additional compensation.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 37 of 244 ends

City Attorney Approved Version 040821 4

7. Compensation.

7.1 The total fee payable for the Basic Services to be performed during the term of this Agreement will be based on the Rate Schedule, for a not to exceed amount of Two Hundred Seventy Nine Thousand Three Hundred Thirty dollars ($279,330), including authorized expense reimbursements, or as otherwise specified in Exhibit A. Any authorized Additional Services will be paid for based on the Rate Schedule. No other compensation for the Services will be allowed except for items covered by subsequent amendments to this Agreement. The City reserves the right to withhold a ten percent (10%) retention until City has accepted the Services.

7.2 Payment will occur only after receipt by City of invoices sufficiently detailed to include hours performed, hourly rates, and related activities and costs for approval by City.

7.3 Within thirty (30) days after receipt of any applicable progress payment request, City will verify the accuracy of the request, correct the charges where appropriate, and make payment to Architect in an amount equal to the amount of such application, as verified or corrected by City. No payment made prior to completion and acceptance of the Services will constitute acceptance of any part of the Services.

City reserves the right to withhold payment from Architect on account of Services not performed satisfactorily, delays in Architect's performance of Services, or other defaults hereunder.

8. Status of Architect.

8.1 Architect will perform the Services in Architect's own way, by controlling the manner and means of the work City needs completed, and pursuant to this Agreement as an independent contractor and in pursuit of Architect's independent calling, and not as an employee of City. The persons used by Architect to provide the Services under this Agreement will not be considered employees of City for any purposes whatsoever.

8.2 The payment made to Architect pursuant to the Agreement will be the full and complete compensation to which Architect is entitled. City will not make any federal or state tax withholdings on behalf of Architect or its agents, employees or subconsultants. City will not pay any workers' compensation insurance, retirement contributions or unemployment contributions on behalf of Architect or its employees or subconsultants. Architect agrees to indemnify and pay City within thirty (30) days for any tax, retirement contribution, social security, overtime payment, unemployment payment or workers' compensation payment, including, but not limited to, those based on any provision of the Federal Affordable Care Act, which City may be required to make on behalf of Architect or any agent, employee, or subconsultant of Architect for work done under this Agreement. At the City’s election, City may deduct the amounts paid pursuant to this Section, from any balance owing to Architect.

9. Subcontracting. Architect's services are being requested by City because they are unique and personal. Except as may be specified in Exhibit A, Architect will not subcontract any portion of the Services without prior written approval of City Manager or his/her designee. If Architect subcontracts any of the Services, Architect will be fully responsible to City for the acts, errors and omissions of Architect's subconsultant and of the persons either directly or indirectly employed by the subconsultant, as Architect is for the acts and omissions of persons directly employed by Architect. Nothing contained in this Agreement will create any contractual relationship between any subconsultant of Architect and City. Architect will be responsible for payment of subconsultants. Architect will bind every subconsultant and every subconsultant of a subconsultant by the terms of this Agreement applicable to Architect's work unless specifically noted to the contrary in the subcontract and approved in writing by City.

10. Other Architects. The City reserves the right to employ other consultants in connection with the Project or the Services.

11. Indemnification. Architect agrees to indemnify, including the cost to defend, City, its officers, agents, volunteers and employees from any and all claims, demands, costs or liability (collectively, “Liability”) that arise out of, or pertain to, or relate to the negligence, recklessness, or willful misconduct of DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 38 of 244 ends

City Attorney Approved Version 040821 5
Architect and its agents in the performance of Services under this Agreement, but this indemnity does not apply to Liability caused by the active negligence, sole negligence or willful misconduct of City. This indemnification obligation is not limited by any limitation on the amount or type of damages available under any applicable insurance coverage and will survive the expiration or termination of this Agreement with respect to any Liability arising from or caused during the term of the Agreement.

12. Insurance. Architect will obtain and maintain, at its cost and expense, for the duration of the Agreement and any and all amendments, insurance against claims for injuries to persons or damage to property which may arise out of or in connection with performance of the Services by Architect or Architect’s agents, representatives, employees or subconsultants. The insurance will be obtained from an insurance carrier admitted and authorized to do business in the State of California. The insurance carrier is required to have a current Best's Key Rating of not less than "A:VII."

12.1 Coverages and Limits. Architect will maintain the types of coverages and minimum limits indicated below, unless Risk Manager or City Manager, in consultation with the City Attorney approves a lower amount. These minimum amounts of coverage will not constitute any limitations or cap on Architect's indemnification obligations under this Agreement. City, its officers, agents, volunteers and employees make no representation that the limits of the insurance specified to be carried by Architect pursuant to this Agreement are adequate to protect Architect. The coverage will contain no special limitations on the scope of its protection to the above-designated insureds except for Workers Compensation and errors and omissions insurance. Architect will obtain occurrence coverage, excluding Professional Liability, which will be written as claims-made coverage. If Architect believes that any required insurance coverage is inadequate, Architect will obtain such additional insurance coverage, as Architect deems adequate, at Architect's sole expense.

12.1.1 Commercial General Liability Insurance. $2,000,000 combined single-limit per occurrence for bodily injury, personal injury and property damage. If the submitted policies contain aggregate limits, general aggregate limits will apply separately to the work under this Agreement or the general aggregate will be twice the required per occurrence limit.

12.1.2 Automobile Liability. $1,000,000 combined single-limit per accident for bodily injury and property damage.

12.1.3 Workers' Compensation and Employer's Liability. Workers' Compensation limits as required by the California Labor Code and Employer's Liability limits of $1,000,000 per accident for bodily injury. Workers' Compensation and Employer's Liability insurance will not be required if Architect has no employees and provides, to City's satisfaction, a declaration stating this.

12.1.4 Professional Liability. Errors and omissions liability appropriate to Architect’s profession with limits of not less than $1,000,000 per claim. The professional liability insurance must include prior acts coverage.

12.2 Endorsements. For Commercial General Liability Insurance, Architect will ensure that the policies are endorsed to name the City, its officers, agents, volunteers and employees as additional insureds. Prior to City's execution of this Agreement, Architect will furnish certificates of insurance and endorsements to City.

12.3 Cancellation. Insurance will be in force during the life of the Agreement and any extensions of it and will not be canceled without thirty (30) days prior written notice to City sent pursuant to the notice provisions of this Agreement.

12.4 Failure to Maintain Coverage. If Architect fails to maintain any of these insurance coverages, then City will have the option to declare Architect in breach of this Agreement, or may purchase replacement insurance or pay the premiums that are due on existing policies in order to maintain the required coverages. Architect is responsible for any payments made by City to obtain or maintain insurance DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 39 of 244 ends

City Attorney Approved Version 040821 6
and City may collect these payments from Architect or deduct the amount paid from any sums due Architect under this Agreement.

12.5 Submission of Insurance Policies. City reserves the right to require, at any time, complete and certified copies of any or all required insurance policies and endorsements.

12.6 Primary Coverage. For any claims related to the Services and this Agreement, the Architect’s insurance coverage will be primary insurance with respect to City, its officers, agents, volunteers and employees. Any insurance or self-insurance maintained by City for itself, its officers, agents, volunteers and employees, will be in excess of Architect’s insurance and not contributory with it.

12.7 Reduction in Coverage/Material Changes. Architect will notify City in writing pursuant to the notice provisions of this Agreement thirty (30) days prior to any reduction in any of the insurance coverage required pursuant to this Agreement or any material changes to the respective insurance policies.

12.8 Waiver of Subrogation. The policies shall contain a waiver of subrogation for the benefit of City.

13. Business License. Architect will obtain and maintain a City of Brentwood Business License for the term of the Agreement, as it may be amended from time-to-time.

14. Maintenance of Records. Architect will maintain complete and accurate records with respect to costs incurred under this Agreement. All records will be clearly identifiable. Architect will allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of records and any other documents created pursuant to this Agreement. Architect will allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

15. Ownership of Documents.

15.1 All product produced by Architect or its agents, employees, and subcontractors pursuant to this Agreement (the “Work Product”) is the property of City. In the event this Agreement is terminated, all Work Product produced by Architect or its agents, employees and subcontractors pursuant to this Agreement will be delivered to City pursuant to the termination clause of this Agreement. Architect will have the right to make one (1) copy of the Work Product for Architect’s records.

15.2 The Work Product may be used by City and its agents, employees, representatives, and assigns, in whole or in part, or in modified form, for all purposes City may deem advisable, without further employment of or payment of any compensation to Architect; provided, however, that if this Agreement is terminated for any reason prior to completion of the Project and if under such circumstances City uses, or engages the services of and directs another Architect to use, the Work Product, City agrees to hold Architect harmless from any and all liability, costs, and expenses relative to claims arising out of matters and/or events which occur subsequent to the termination of this Agreement as a result of causes other than the fault or negligence of Architect, or anyone for whose acts it is responsible, in preparation of the Work Product. Architect will not be responsible for deficiencies solely attributable to modifications of the Work Product performed by others, or that arise from use of the Documents in connection with a project or site other than that shown in the Work Product.

16. Copyrights. Architect agrees that all copyrights that arise from the Services will be vested in City and Architect relinquishes all claims to the copyrights in favor of City.

17. Confidentiality. All documents, reports, information, data, and exhibits prepared or assembled by Architect in connection with the performance of the Services pursuant to the Agreement are confidential until released by the City to the public, and the Architect will not make any of these documents or information available to any individual or organization not employed by the Architect or the City without the written consent of the City before any such release.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 40 of 244 ends

City Attorney Approved Version 040821 7

18. Notices. Any notices relating to this Agreement shall be given in writing and shall be deemed sufficiently given and served for all purposes when delivered personally, by facsimile or by generally recognized overnight courier service, or five (5) days after deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, addressed as follows:

For City:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Phone No. (925) 516-5307
Attn: Vatsal Patel
Email: [email protected]
For Architect:

Name: Advance Design Consultants, Inc.

Title: Principal
Address: 998 Park Avenue
San Jose, CA 95126
Phone No.: (408) 297-1881
Attn: Lorenzo R. Rios, P.E.

Email: [email protected]
Either Party may change its address for purposes of this section by giving the other Party written notice of the new address in the manner set forth above.

19. Conflicts of Interest.

19.1 City will evaluate Architect’s duties pursuant to this Agreement to determine whether disclosure under the Political Reform Act and City’s Conflict of Interest Code is required of Architect or any of Architect’s employees, agents, or subcontractors. Should it be determined that disclosure is required, Architect or Architect’s affected employees, agents, or subconsultants will complete and file with the City Clerk those schedules specified by City and contained in the Statement of Economic Interests Form 700.

19.2 Architect understands that its professional responsibility is solely to City. Architect warrants that it presently has no interest, present or contemplated, and will not acquire any direct or indirect interest, that would conflict with its performance of this Agreement. Architect further warrants that neither Architect, nor Architect’s agents, employees, subcontractors and Architects have any ancillary real property, business interests or income that will be affected by this Agreement or, alternatively, that Architect will file with the City an affidavit disclosing this interest. Architect will not knowingly, and will take reasonable steps to ensure that it does not, employ a person having such an interest in the performance of this Agreement. If after employment of a person, Architect discovers that it has employed a person with a direct or indirect interest that would conflict with its performance of this Agreement, Architect will promptly disclose the relationship to the City and take such action as the City may direct to remedy the conflict.

20. General Compliance with Laws. Architect will keep fully informed of federal, state and local laws and ordinances and regulations which in any manner affect those employed by Architect, or in any way affect the performance of the Services by Architect. Architect will at all times observe and comply with these laws, ordinances, and regulations and will be responsible for the compliance of the Services with all applicable laws, ordinances and regulations.

21. Pandemic Health Laws. Architect’s duty to comply with Laws includes compliance by Architect and Subcontractors with all local, state, or federal Laws that have been or may be enacted in response to the COVID-19 pandemic (collectively, “Health Laws”), which include all of the County of Contra Costa Health Orders. Failure to fully comply with the Health Laws constitutes a material default, subject to all available remedies including suspension or termination.

22. Discrimination and Harassment Prohibited. Architect will comply with all applicable local, state and federal laws and regulations prohibiting discrimination and harassment.

23. Termination. In the event of the Architect's failure to prosecute, deliver, or perform the Services, City may terminate this Agreement for nonperformance by notifying Architect in writing pursuant to the notice provisions of this Agreement. Architect has five (5) business days to deliver any documents owned DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 41 of 244 ends

City Attorney Approved Version 040821 8
by City and all work in progress to City address contained in this Agreement. City will make a determination of fact based upon the work product delivered to City and of the percentage of work that Architect has performed which is usable and of worth to City in having the Agreement completed. Based upon that finding City will determine the final payment of the Agreement. In the event City elects to terminate, City will have the right to immediate possession of all Work Product and work in progress prepared by Architect, whether located at the project site, at Architect's place of business, or at the offices of a subconsultant.

Either Party, upon tendering thirty (30) calendar days written notice to the other Party, may terminate this Agreement for convenience. In this event and upon request of City, Architect will assemble the work product without charge and put it in order for proper filing and closing and deliver it to City. Architect will be paid for work performed to the termination date; however, the total will not exceed the lump sum fee payable under this Agreement. City will make the final determination as to the portions of tasks completed and the compensation to be made.

24. Covenants Against Contingent Fees. Architect warrants that Architect has not employed or retained any company or person, other than a bona fide employee working for Architect, to solicit or secure this Agreement, and that Architect has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift, or any other consideration contingent upon, or resulting from, the award or making of this Agreement. For breach or violation of this warranty, City will have the right to terminate this Agreement for nonperformance, or, in its discretion, to deduct from the Agreement price or consideration, or otherwise recover, the full amount of the fee, commission, percentage, brokerage fees, gift, or contingent fee.

25. Claims And Lawsuits. By signing this Agreement, Architect agrees that any Agreement claim submitted to City must be asserted as part of the Agreement process as set forth in this Agreement and not in anticipation of litigation or in conjunction with litigation. Architect acknowledges that if a false claim is submitted to City by Architect, it may be considered fraud and Architect may be subject to criminal prosecution. Architect acknowledges that California Government Code sections 12650 et seq., the False Claims Act, applies to this Agreement and, provides for civil penalties where a person knowingly submits a false claim to a public entity.

26. Jurisdiction, Venue and Governing Law. Any action at law or in equity brought by either of the Parties for the purpose of enforcing a right or rights provided for by this Agreement will be tried in a court of competent jurisdiction in the County of Contra Costa, State of California, and the Parties waive all provisions of law providing for a change of venue in these proceedings to any other county. This Agreement will be governed by the laws of the State of California.

27. Testimony. Architect will testify at City's request if litigation is brought against City in connection with Architect's services under this Agreement. Unless the action is brought by Architect, or is based upon Architect's actual or alleged negligence or other wrongdoing, City, upon prior written agreement with Architect will compensate Architect for time spent in preparation for testimony, testimony, and travel at Architect's standard hourly rates at the time of actual testimony.

28. Successors and Assigns. It is mutually understood and agreed that this Agreement will be binding upon the Parties and their respective successors. Neither this Agreement nor any part of it nor any monies due or to become due under it may be assigned by Architect without the prior written consent of City, which will not be unreasonably withheld.

29. Section Headings. Section headings as used in this Agreement are for convenience only and will not be deemed to be a part of such sections and will not be construed to change the meaning of the section.

30. Waivers. The waiver by either Party of any breach or violation of any term, covenant, or condition of this Agreement or of any applicable law will not be deemed to be a waiver of such term, covenant, condition or law or of any subsequent breach or violation of same or of any other term, covenant, condition or law. The acceptance by either Party of any fee or other payment which may become due under this DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 42 of 244 ends

City Attorney Approved Version 040821 9
Agreement will not be deemed to be a waiver of any preceding breach or violation by the other Party of any term, covenant, or condition of this Agreement or any applicable law.

31. Entire Agreement and Order of Precedence. This Agreement, together with any other written document referred to or contemplated by it embody the entire Agreement and understanding between the Parties relating to the subject matter of it. The City Manager is authorized, in consultation with the City Attorney, to agree to non-material amendments to this Agreement. Neither this Agreement nor any of its provisions may be amended, modified, waived or discharged except in a writing signed by both Parties.

Notwithstanding that the RFP and Proposal are incorporated into this Agreement as Exhibit B and Exhibit C, respectively, if any provision in the Proposal or the RFP differs from or is inconsistent with the terms of this Agreement, including Exhibit A, the terms of this Agreement, including Exhibit A, will take precedence over any such differing or inconsistent provision. Likewise, to the extent any terms in the Proposal differ from or are inconsistent with the terms of the RFP, the terms of the RFP will take precedence over any differing or inconsistent terms in the Proposal.

32. Authority. The individuals executing this Agreement and the instruments referenced in it on behalf of Architect each represent and warrant that they have the legal power, right and actual authority to bind Architect to the terms and conditions of this Agreement. [Signatures on the following page]
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 43 of 244 ends

City Attorney Approved Version 040821 10

33. Severability. If any term, provision, condition or covenant of this Agreement or its application to any Party or circumstances shall be held, to any extent, invalid or unenforceable, the remainder of this Agreement, or the application of the term, provision, condition or covenant to persons or circumstances other than those as to whom or which it is held invalid or unenforceable, shall not be affected, and shall be valid and enforceable to the fullest extent permitted by law.

34. Signatures.

34.1 Counterparts. This Agreement may be executed in two or more counterparts, each of which together will be deemed an original, but all of which together will constitute the same instrument.

34.2 Digital/Electronic Signatures. Using a City-approved method, this Agreement may be executed through the use of digital or electronic signatures in accordance with Government Code Section

16.5. The presence of an electronic signature on this Agreement will be construed as the Parties’ consent to do business electronically.

ARCHITECT:
* By:

Lorenzo R. Rios, President
** By:

Paola Martinez, Secretary
CITY:

By:

Tim Y. Ogden, City Manager
ATTEST:

By:

Margaret Wimberly, City Clerk
APPROVED AS TO FORM:

By:

Katherine Wisinski, Interim City Attorney
If required by City, proper notarial acknowledgment of execution by Architect must be attached. If a Corporation, Agreement must be signed by one corporate officer from each of the following two groups. *Group A. **Group B.

Chairman, Secretary,
President, or Assistant Secretary,
Vice-President CFO or Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation.

If an LLC:
• The Agreement must be signed by a Managing Member or the LLC must attach a resolution empowering the signatory to bind the LLC.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 44 of 244 ends

City Attorney Approved Version 040821 11
If a partnership:
• The Agreement must be signed by the Managing Partner or the Partner authorized to execute agreements of this type. Additional documentation, such as the partnership agreement, confirming this signature authority may be required.

If a sole proprietorship:
• The Agreement must be signed by the owner.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 45 of 244 ends

City Attorney Approved Version 040821 12

AGREEMENT FOR ARCHITECTURAL SERVICES
Advance Design Consultants, Inc.

Water and Wastewater Laboratory Project, CIP No. 592-59207 EXHIBIT “A”

PART ONE - SCOPE OF SERVICES

1. General. Architect must provide Architectural design and related services for the Project, as more particularly described in the RFP and Proposal, including and subject to the following general requirements.

1.1 Preliminary Design Conference. Following the City’s execution of this Agreement, or as otherwise specified in Exhibit A, Architect must attend a preliminary design conference with the Project Manager. At the request of the Project Manager, the Architect must submit written minutes of the preliminary design conference in order to demonstrate its understanding of the Project requirements.

1.2 City Approval. Architect may not proceed with the development of successive Design Documents, as detailed below in Section 2, until it has received written approvals from the City. Architect must promptly review and revise the following to the City’s satisfaction, without additional compensation:
(A) Design Documents submitted for City approval and to which the City has objections; and
(B) Design Documents which have been determined by the City to present excessive cost or constructability problems.

1.3 Governmental Approval. Architect must assist the City with obtaining the required approvals from applicable governmental agencies with jurisdiction over the Project.

1.4 Architect will control the manner and the means of the services to be provided, and be responsible for the professional quality, technical accuracy and coordination of the Services. Architect will, without additional compensation, correct or revise any errors or deficiencies in the Services.

1.5 Architect will keep City informed on a regular basis that the Services are being performed in accordance with the requirement and intentions of this Agreement.

2. Basic Services. In addition to the tasks specified in the RFP and Proposal, Architect’s Basic Services include the following:

2.1 Project Schedule. Following the City’s execution of this Agreement, Architect must prepare and submit for the City Engineer’s review and approval a preliminary Project Schedule, based on the Proposed Project Schedule included in in Part Two, below,, showing the timing and sequencing of the major design and construction phases required to complete the Project. The preliminary Project Schedule should include times for completion of all major phases of environmental procedures, if applicable; design; bidding; construction; final close out; or as otherwise specified by the Project Manager. The Project Schedule must be updated for the City Engineer’s review and approval upon completion of each major phase included in the Project Schedule.

2.2 Cost Estimate. Following the City’s execution of this Agreement, Architect must prepare and submit for the City Engineer’s review and approval a preliminary estimate of the cost to construct the Project. As the design process progresses, Architect must submit updates to the preliminary cost estimate for the City’s approval concurrent with its submission of the Schematic Design Documents, Design Development Documents, and Construction Documents, respectively. If at any time, an updated cost estimate exceeds the City’s previously approved cost estimate, Architect must provide the City with recommendations for constructing the Project within the City’s budget.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 46 of 244 ends

City Attorney Approved Version 040821 13

2.3 Schematic Design Documents. Within the time specified in the approved Project Schedule, Architect must prepare and submit for the City Engineer’s review and approval Schematic Design Documents consisting of drawings, outline specifications, and other documents showing the Project’s basic components, scale, and location on the Project site. The Schematic Design Documents must include, to the extent applicable, conceptual plans of the Project site and improvements; preliminary sections and elevations; approximate areas, volumes, and dimensions; and preliminary selections of materials and systems. The Schematic Design Documents and updated cost estimate may be submitted electronically to the Project Manager, unless the Project Manager specifically requests two printed sets and one reproducible set of the Schematic Design Documents.

2.4 Design Development Documents. Based on the approved Schematic Design Documents and within the time specified in the approved Project Schedule, Architect must prepare for the City Engineer’s review and approval the Design Development Documents. The Design Development Documents must further define the Project, including drawings and outline specifications fixing and describing the Project size, character and site relationships, and other appropriate elements describing the structural, engineering, mechanical and electrical systems, as applicable. The Design Development Documents must include, as applicable, plans, sections and elevations; criteria and sizing of major components; equipment sizes and capacities and approximate layouts, including required spaces and clearances; typical details; materials selections and general quality levels. When submitting the Design Development Documents for the City Engineer’s approval, the Architect must identify in writing all material changes and deviations, if any, that have taken place since approval of the Schematic Design Documents, including, but not limited to, changes to the last updated cost estimate and the approved Project Schedule.

The Design Development Documents and updated cost estimate may be submitted electronically to the Project Manager, unless the Project Manager specifically requests two printed sets and one reproducible set of the Design Development Documents.

2.5 Construction Documents. Based on the approved Design Development Documents and within the time specified in the approved Project Schedule, Architect must prepare for the City Engineer’s review and approval, and required governmental agency approval(s), if applicable, Construction Documents setting forth in detail the quality levels of and the requirements for construction of the Project, and consisting of drawings and technical specifications that comply with all applicable codes, laws, ordinances and regulations in effect at the time of their preparation at the location of the Project, and as further specified in the RFP. The Construction Documents must be submitted to the City Engineer in electronic form, ready to be added to the front end documents, which will be prepared by the City using the City’s approved front end documents. When submitting the Construction Documents for the City Engineer’s approval, the Architect must identify in writing all material changes and deviations, if any, that have taken place since approval of the Design Development Documents including, but not limited to, changes to the last updated cost estimate and the approved Project Schedule. The Construction Documents and updated cost estimate may be submitted electronically to the Project Manager, unless the Project Manager specifically requests two printed sets and one reproducible set of the Construction Documents.

2.6 Bidding Phase Services. Architect must assist the City during the bidding phase, including, if applicable, prequalification of bidders; conducting pre-bid meetings or site walks; issuance of addenda; bid review; and review of bid protests. If the lowest responsive bid exceeds the final approved construction cost estimate by twenty-five percent or more, and the City, acting in its sole discretion decides to reject all bids and re-bid the Project, Architect must, at no additional cost to the City, work with the City to make the modifications to the Construction Documents to reduce the cost of construction so as not to exceed the previously approved construction cost estimate by more than the stated additional percentage.

2.7 Construction Phase Services. During the Construction Phase the Architect must provide the following services to the City, as more particularly specified in Exhibit A:
(A) General administration of the Construction Contract including: review and advise the Project Manager as to the accuracy and reasonableness of Contractor’s schedule of values; coordinate the Project Schedule with the Contractor’s Work schedule; provide prompt and complete responses to DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 47 of 244 ends

City Attorney Approved Version 040821 14
Contractor’s requests for information; and coordinate efforts with the Project Manager to ensure the Project is completed in a timely, cost-effective manner, consistent with the City’s requirements. (B) Ongoing design services as needed, including: interpretations and clarifications of the Construction Documents provided by the Architect; and preparation of design details for Change Orders, as needed for the proper execution and progress of the Work and consistent with the intent of the approved Construction Documents.
(C) Architect must timely review Contractor’s design-related submittals, including shop drawings, product data and samples, and issue written approvals of and/or recommendations to the City within ten days of receipt of each such submittal, unless additional time is required based on the nature of the submittal, in which case the review must be completed as soon as practicable under the circumstances.

Architect must check the submittals for compliance with the approved Construction Documents. Architect’s review must not extend to the Contractor’s means, methods, techniques, sequences, or procedures, unless such have previously been specified in the Construction Documents. (D) Architect must assist the Project Manager in evaluating whether to recommend approval of requests for changes in the Work, and, if applicable, must assist with preparing proposed Change Orders.
(E) Architect must visit the Project site at intervals sufficient to monitor the progress and quality of the Work and to determine whether the Work is proceeding in conformance with the Construction Documents. Following each Project site visit, Architect must promptly provide the Project Manager with a written report of Architect’s observations and recommendations, if any. If Architect becomes aware of any defects or deficiencies in the Work, Architect must provide prompt notice to the Project Manager, followed by written confirmation of that notice. If, in Architect’s opinion, special testing or inspection of the Work is needed, Architect must recommend appropriate procedures and Architects to the City. Architect is not responsible for Contractor’s safety precautions and programs. However, if Architect has knowledge of safety violations, Architect must give prompt notice to the City of such violations. (F) Architect must assist the City in evaluating the Contractor’s payment applications in accordance with the Construction Documents. Based on on-site observations and review of other relevant information, Architect must evaluate whether the Work has progressed to the point indicated in the payment application. Architect’s review must include review of the status of the Contractor’s record drawings.
(G) Architect must attend meetings with the Project Manager and Contractor(s) prior to and during construction as follows: twice monthly progress meetings. (H) Architect must prepare and submit reports on the progress or status of the Work to the Project Manager as specified: Monthly invoicing emailed to Accounts Payable, [email protected], with copies to Vatsal Patel, [email protected], and Renee Payette, [email protected].
(I) Architect must conduct inspections reasonably necessary to determine whether Contractor has achieved final completion of the Work in accordance with the Construction Contract, and must prepare a list of items to be completed or corrected (the “punch list”), including estimates of the cost for the City to correct or complete each punch list item, as well as required final submittals (e.g., warranties, manuals, as-built drawings, etc.) in order to achieve final completion.

2.8 Close Out and Post-Construction Services
(A) Architect must promptly perform all tasks reasonably necessary for Project close out. If requested, Architect must provide the City with a color schedule of all finished materials incorporated into the Project.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 48 of 244 ends

City Attorney Approved Version 040821 15
(B) If requested by the City, Architect must visit the Project site during the warranty period to advise the City on the need for warranty work, as determined by the City. (C) All Project plans, including, but not limited to, record drawings, specifications, and estimates prepared pursuant thereto, must be and remain the property of the City for the purposes of repair, maintenance, renovation, modernization, or other purposes, only as they relate to the Project. The City reserves the right to use the Construction Documents, record drawings, or estimates related to the Project for the purposes of additions, alignments, or other development on or near the site or elsewhere in the City.

Nothing in this provision is intended to transfer or waive Architect’s copyrights over these documents, including, but not limited to, all common law, statutory, and other reserved rights, unless transferred or waived in writing by Architect. Notwithstanding the foregoing, if the City proposes to reuse the Construction Documents, in whole or in part, the City and Architect will specify the terms and conditions for the reuse in this Agreement by an amendment or addendum.

3. Additional Services. If not expressly included in Basic Services, as specified above or in RFP or the Scope of Services in Exhibit A, the following services must be provided by Architect and will be paid for as Additional Services, subject to prior written authorization by the City:

3.1 Investigation of financing or other special studies to determine the financial feasibility of the Project.

3.2 Consultations, negotiation, and the like for procurement of Project financing.

3.3 Investigation of or measured drawings of existing conditions or improvements or verification of the accuracy of the City-provided drawings or other information on existing conditions.

3.4 Surveys, site evaluations, or legal descriptions.

3.5 Soils, subsurface and environmental studies, reports and investigations required by outside agencies with jurisdiction over the Project.

3.6 Revisions to the City-approved Construction Documents which are required due to circumstances outside of Architect’s control.

3.7 Design, coordination, management, expediting and other services for the procurement of materials to be obtained or work to be performed by the City, including, but not limited to technology or other specialty systems which are not otherwise required by this Agreement.

3.8 Estimates, appraisals, consultations, and related services required for the repair or replacement of an insured loss.

3.9 Preparing for or providing expert witness services or participation in out-of-court dispute resolution in connection with any Project-related dispute or adversarial proceeding to which the Architect is not a party, or potential party.

3.10 Out of town travel in connection with the Services, other than travel between Architect’s office, the City’s offices, and the Project site.

3.11 The City-requested services which are not included in Basic Services and are not customarily provided as part of generally accepted Architectural design services for this type of project and the region in which the Project is located.

3.12 Extended services required by non-performance, suspension, termination, or default of the Contractor in the performance of the Work, through no fault of Architect.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 49 of 244 ends

City Attorney Approved Version 040821 16

3.13 Preparation of special models, renderings or mock-ups, which are not included in Basic Services.

3.14 Other services as agreed to by the Parties as set forth in written amendment or addendum to this Agreement.

4. References. Architect’s Services, including preparation of the Design Documents, should be informed and guided by the information or requirements included in the following document(s):

1. Preliminary Design Report

2. Environmental Clearance Document

3. Geotechnical Report

4. Utility Maps

5. Any other applicable document(s) that may assist in the design and/or construction

PART TWO - PROPOSED PROJECT SCHEDULE
Activity Tentative Date(s)
Preliminary Design Conference March 2024
Submit Preliminary Project Schedule March 2024
Submit Schematic Design Documents May 2024
Submit Design Development Documents July 2024
Submit Construction Documents October 2024
Publication of Bid Notice December 2024
Bid Opening January 2025
Award Construction Contract February 2025
Begin Construction March 2025
Project Completion December 2025
Project Closeout January 2026
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 50 of 244 ends

City Attorney Approved Version 040821 17

AGREEMENT FOR ARCHITECTURAL SERVICES
EXHIBIT “B”

REQUEST FOR PROPOSALS
City of Brentwood
Water and Wastewater Laboratory Project, CIP No. 592-59207 DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 51 of 244 ends

ENGINEERING DEPARTMENT
150 City Park Way, Brentwood, CA 94513
Phone 925.516.5420 Fax 925.516.5421
www.brentwoodca.gov
January 5, 2024
To: All Interested Qualified Architectural Design Firms Subject: Request for Proposals for Architectural Design Services Water and Wastewater Laboratory Project, CIP Project No. 592-59207 The City of Brentwood invites qualified architectural design firms to submit proposals for architectural design services for the Water and Wastewater Laboratory Project, CIP Project No. 592-59207 (“Project”).

The Project will construct a new, larger laboratory for the water and wastewater systems at the City’s Wastewater Operations Administrative Building (“Admin Building”) located at 2251 Elkins Way, Brentwood, CA.

The existing laboratory was constructed in 2002 as part of the Admin Building, which includes three workstations and an area for sampling, testing, and analysis. However, it has become outdated, outgrown its current footprint, and is not expandable within the Admin Building. The new laboratory will provide adequate laboratory space for future build-out conditions within the City’s Municipal Services Corporation Yard.

To be considered, please email your proposal in PDF format to [email protected] no later than 4:00 p.m. on February 9, 2024, with the subject line as follows: “Proposal for Water and Wastewater Laboratory Project, CIP Project No. 592-59207.” A mandatory Pre-submittal Meeting is scheduled for 10:00 a.m. on Tuesday, January 23, 2024, in the Conference Room at the Wastewater Operations Administrative Building, located at 2251 Elkins Way, Brentwood.

Questions should be e-mailed to [email protected] to the attention of Vatsal Patel no later than 5:00 p.m. on January 31, 2024. Answers to questions will be shared with all firms that have obtained the RFP document. To ensure receipt of notifications regarding this RFP and to have the proposal considered valid, this document must be obtained directly from the City.

To obtain an electronic copy of the RFP via email at no charge, complete the Document Request Form located at https://www.brentwoodca.gov/government/projects-bids-rfps.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 52 of 244 ends

RFP for Architectural Design Services Water and Wastewater Laboratory Project

Page 2 of 2 ends

January 5, 2024
This solicitation does not commit the City to pay any costs incurred in the preparation and presentation of submittals or to select any consultant who responds. This solicitation covers only the work described herein and does not commit the City to any work beyond that described.

Sincerely,
Vatsal Patel, P.E.

Engineering Manager
Attachments:

Request for Proposals
Exhibit A – Sample Agreement for Architectural Services Exhibit B – Scope of Services
Exhibit C – Site Maps
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 53 of 244 ends

City Attorney Approved Version 060120
City of Brentwood

REQUEST FOR PROPOSALS
for Architectural Design Services
Water and Wastewater Laboratory Project
CIP Project No. 592-59207
Date of Issuance: January 5, 2024
Pre-Submittal Meeting Date: 10:00 a.m. on January 23, 2024 Request for Information Deadline: 5:00 p.m. on January 31, 2024 Proposal Deadline 4:00 p.m. on February 9, 2024
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 54 of 244 ends

City of Brentwood
Request for Proposals
Page | 1
City Attorney Approved Version 060120

CITY OF BRENTWOOD

REQUEST FOR PROPOSALS
The City of Brentwood (“City”) requests proposals (“Proposals”) from qualified individuals or firms (individually, a “Respondent” and collectively, “Respondents”) for architectural design services for its Water and Wastewater Laboratory Project, CIP Project No. 592-59207 (“Project”).

1. ABOUT THE CITY
The City is a general law city located in east Contra Costa County, with an estimated population of 65,300. Additional information about the City is available online at:
https://www.brentwoodca.gov.

2. THE PROJECT
A. Summary. The City requires architectural design services (“Services”) for its Project. The Project involves construction of a new, larger laboratory at the City’s Wastewater Operations Administrative Building (“Admin Building”) located at 2251 Elkins Way, Brentwood. The Services required for the Project include architectural services to develop and prepare construction design documents for the Project.

B. Form of Agreement. A copy of the City’s standard Agreement for Architectural Services (“Agreement”) is attached and incorporated as Exhibit A. By submitting a Proposal, the Respondent agrees to enter into the Agreement using the attached form with no exceptions to the form of the Agreement.

C. Scope of Services. The required Scope of Services is attached and incorporated as Exhibit B. By submitting a Proposal, the Respondent represents that it is fully qualified and available to provide the Services set forth in the Scope of Services at the price set forth in its Proposal, and that it agrees to provide those Services if it is awarded the Agreement, which will attach and incorporate the Scope of Services.

D. Site Maps. Attached as Exhibit C.

3. REQUEST FOR PROPOSAL PROCEDURES
A. Requests for Information. Questions or objections relating to the Request for Proposal (“RFP”), the RFP attachments, the RFP procedures, the Project, or the required Services may only be submitted via email to [email protected] by 5:00 p.m., January 31, 2024 (the “Request for Information Deadline”). Any questions or objections that are not submitted in the manner specified and by the Request for Information Deadline will be deemed waived. City will not be bound by the oral representations of any City officials, employees, or representatives.

B. Pre-Submittal Meeting. A Pre-Submittal Meeting will be held at 10:00 a.m. on January 23, 2024, in the Conference Room at the Wastewater Operations Administrative Building (2251 Elkins Way, Brentwood). Prospective Respondents will have the DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 55 of 244 ends

City of Brentwood
Request for Proposals
Page | 2
City Attorney Approved Version 060120
opportunity to ask questions about the RFP and the required Services. Respondents will be required to sign-in at the Pre-Submittal Meeting and to provide an email address for the Respondent’s representative for receipt of any subsequent addenda. The PreSubmittal Meeting is mandatory, and the City may, acting in its sole discretion, disregard any Proposal submitted by a Respondent that failed to attend or failed to arrive on time for the Pre-Submittal Meeting.

C. Submittal Instructions. Proposals must be received by the City by or before February 9, 2024 at 4:00 p.m. Pacific Standard Time (“Proposal Deadline”).Respondent must submit one copy of the Proposal in PDF format via email to Vatsal Patel, Engineering Manager at [email protected] with the subject line stating: “Proposal for Water and Wastewater Laboratory Project, CIP Project No. 592-59207” by the Proposal Deadline. Late submissions will be disregarded.

D. Planned RFP Schedule. The following schedule is provided for planning purposes based on current information. However, all dates are subject to revision, including the Proposal Deadline, and may be amended by addenda to this RFP.

ACTIVITY PLANNED DATES/TIME
RFP Issued January 5, 2024
Mandatory Pre-Submittal Meeting January 23, 2024 at 10:00 a.m.

Request for Information Deadline January 31, 2024 by 5:00 p.m.

Proposal Deadline February 9, 2024 by 4:00 p.m.

Interviews (if requested by City) February 16, 2024
Notice of Selection February 20, 2024
Council Consideration of Award March 12, 2024
Commence Services March 26, 2024
Project Completion November 30, 2024
E. Addenda. City reserves the right to issue addenda to modify the terms and conditions of this RFP, including modifications to the Proposal Deadline or to the Exhibits to this RFP. Addenda will be posted on the City’s website at https://www.brentwoodca.gov/government/projects-bids-rfps. Each Respondent is solely responsible for checking the City’s website for addenda, and for reviewing any and all addenda before submitting its Proposal.

4. PROPOSAL REQUIREMENTS
Each Proposal must be submitted in compliance with the requirements of this RFP. Each Proposal must respond to the items listed below. Clarity and brevity are preferable to volume. Unless requested, do not attach brochures or promotional materials to the Proposal. Proposals should not exceed sixteen (16) one-sided pages, excluding any tabs or dividers, cost sheet(s), and cover page(s). However, resumes may be included in an appendix and will not be counted in the total page count. By submitting a Proposal, the Respondent agrees that the lump sum price and proposed approach to providing the Services, including staffing, constitute a firm offer to enter into the Agreement with the City, and that the offer will remain open for 60 days following the Proposal Deadline.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 56 of 244 ends

City of Brentwood
Request for Proposals
Page | 3
City Attorney Approved Version 060120
A. Cover Letter. Provide a brief cover letter that includes all of the following information:
(1) Respondent’s name, address, phone number, and website address; (2) Type of organization (e.g. corporation, partnership, sole proprietorship; and State of formation);
(3) A summary of general information about Respondent and the types of services it provides in relation to the Services required by the City; and (4) Contact information, including name, title, address, phone number, and email, of Respondent’s primary representative for purposes of this RFP.

The cover letter must be signed by a representative that is authorized to bind Respondent by contract and must state their name, title, and email address.

B. General Qualifications. Provide a brief description of the Respondent’s business, including the number of years in business under the current name. Describe the size of the business, including total number of employees and offices, and identify and briefly describe each local office that will be involved in providing the Services if awarded the Agreement. Describe how and why Respondent is qualified to provide the Services.

C. Experience. Identify services Respondent has provided in the last five years for projects that are similar in scope and nature to the Project described in this RFP, particularly with respect to services provided to other cities or public agencies. For each example, provide (1) a brief description of the services provided, (2) an explanation of why this experience is relevant to the required Services, and (3) the name and address of the contracting agency, including contact information for a reference check (name, title, phone number, and email address).

D. Staffing. Identify by name and title Respondent’s key personnel that will be assigned to provide the Services and for each, include a resume with his or her education, training, and experience. Identify by name, address, and website, each sub-consultant or subcontractor, if any, that will be involved with providing the Services, including the proposed role for each such sub-consultant or subcontractor. Include all applicable license numbers for any license required to perform the Services.

E. Price. Provide a lump sum price and cost breakdown for the Services that is fully inclusive of all costs to provide the Services, including hourly billing rates, all labor, materials, equipment, supplies, the insurance required under the terms of the Agreement, travel fees, and any additional cost(s) the City would incur if Respondent is awarded the Agreement. Attach a copy of billing rates that would apply to any authorized additional Services.

F. Proposed Approach. Briefly describe Respondent’s proposed approach to providing the Services and how that approach will offer value to the City. Identify any proposed innovations that may be used to achieve more cost-effective delivery of the Services and/or cost savings for the Project as a whole.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 57 of 244 ends

City of Brentwood
Request for Proposals
Page | 4
City Attorney Approved Version 060120

5. EVALUATION
The factors that the City will consider in evaluating Proposals are as follows:
• General qualifications 1-15 points
• Relevant experience 1-15 points
• Proposed staffing 1-15 points
• Pricing 1-15 points
• Proposed approach 1-10 points
• Responsiveness 1-10 points
• References 1-10 points
• Interview (if requested) 1-10 points
Total Points Possible 100 points

6. SELECTION AND AWARD
A. Review. Proposals will be reviewed for responsiveness and evaluated and ranked based on the factors listed in Section 5, above. When the evaluation is complete, the Proposals will be ranked based on total scores to identify the Proposal that provides the best value to the City. Acting in its sole discretion, the City may elect to conduct interviews with shortlisted Respondents. Interviews are not public meetings as defined by California open meeting laws (the Brown Act).

B. Award. The City staff will recommend award of the Agreement, if at all, to the Respondent that is determined by the staff to offer the best value to the City based on the City’s review, as outlined above. City staff will submit its recommendation to the City Council or the awarding officer, as applicable, for award of the Agreement to the Respondent that it determines to offer the best value. The Respondents will be notified of staff’s intended recommendation by a Notice of Selection, which will be posted on the City’s website at https://www.brentwoodca.gov/government/projects-bids-rfps, and which may also be emailed to each Respondent that submits a Proposal. The City Council or awarding officer will award the Agreement, if at all, to the Respondent that is determined by the City Council, acting in its sole discretion, to offer the best value to the City.

C. Protest Procedures. Any protest challenging the City’s intended selection or the selection process must be submitted no later than 5:00 p.m., on the fifth business day following the date of the Notice of Selection. The protest must be submitted in writing via email to Vatsal Patel, Engineering Manager, at [email protected], and must clearly specify the basis for the protest. The protest will be reviewed by Allen Baquilar, Director of Engineering/City Engineer, in consultation with the City Attorney’s Office, and the reviewing individual’s determination on the protest is final. No public hearing will be held on the protest. Time being of the essence, the City reserves the right to proceed with award of the Agreement and commencement of the Services notwithstanding any pending protest or legal challenge.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 58 of 244 ends

City of Brentwood
Request for Proposals
Page | 5
City Attorney Approved Version 060120

7. MISCELLANEOUS
A. Disclaimers and Reservation of Rights. Upon receipt, each Proposal becomes the sole property of City and will not be returned to the Respondent. Each Respondent is solely responsible for the costs it incurs to prepare and submit its Proposal. The City reserves, in its sole discretion, the right to reject any and all Proposals, including the right to cancel or postpone the RFP or the Services at any time, or to decline to award the Agreement to any of the Respondents. The City reserves the right to waive any immaterial irregularities in a Proposal or submission of a Proposal. The City reserves the right to reject any Proposal that is determined to contain false or misleading information, or material omissions.

B. Conflict of Interest. Respondents must disclose to the City any actual, apparent, direct or indirect, or potential conflicts of interest that may exist with respect to Respondent, any employees of Respondent, or any other person relative to the Services to be provided pursuant to this RFP. This RFP process will be conducted in compliance with all laws regarding political contributions, conflicts of interest, or unlawful activities. In accordance with Government Code Section 1090, Respondents who have participated in preliminary discussions, negotiations, reasoning, planning, and/or drawing of plans and specifications for previous agreements related to the same scope of work, will be excluded from consideration for the award of the Agreement. City employees are prohibited from participating in the selection process for this RFP if they have any financial or business relationship with any Respondent.

C. Public Records. The City is subject to the provisions of the California Public Records Act (Govt. Code § 6250 et seq.) (the “Act”), and each Proposal submitted to the City is subject to disclosure as a public record, unless the Proposal or any portion thereof is exempt under the Act. If a Respondent believes that any portion of its Proposal is exempt from disclosure under the Act, it must clearly identify the portion(s) it believes to be exempt and identify the basis for the exemption. Each Respondent bears the burden of proving any claimed exemption under the Act, and by submitting a Proposal, a Respondent agrees to indemnify, defend, and hold harmless the City against any third party claim seeking disclosure of the Proposal or any portions thereof.

Attachments:

Exhibit A – Form of Agreement
Exhibit B – Scope of Services
Exhibit C – Site Maps
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 59 of 244 ends

City of Brentwood
Request for Proposals
Page | 6
City Attorney Approved Version 060120
Exhibit A – Form of Agreement
The City utilizes standard contract provisions for all professional and technical services agreements. A sample agreement is herein attached for your review. Submission of a proposal constitutes acceptance of the agreement format and provisions.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 60 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 1

AGREEMENT FOR ARCHITECTURAL SERVICES
[Insert Name of Architect]
THIS AGREEMENT FOR ARCHITECTURAL SERVICES (“Agreement”) is made and entered into as of the _____ day of __________________, 2024 by and between the City of Brentwood, a municipal corporation of the State of California ("City"), and ____________________________________________, a _______________ ("Architect") (each a “Party” and collectively, the “Parties”).

RECITALS
A. City does not have available personnel specifically trained and experienced to perform the architectural services required and requires the professional services of an individual or business entity with the necessary license, qualifications and experience to provide architectural services for the City’s Water and Wastewater Laboratory Project, CIP Project No. 592-59207 (the “Project”).

B. Architect has the necessary license, professional skills and experience necessary to perform the architectural services described in this Agreement, and as further described in Exhibit A to this Agreement (“Exhibit A”), and in the City’s Request for Proposals for architectural Services for the Project, dated January 5, 2024 (“RFP”), attached as Exhibit B, both of which exhibits are incorporated herein.

C. City desires to engage Architect to provide these architectural services by reason of its qualifications and experience in performing such services.

D. Architect has submitted a proposal to City, dated <Month and Day>, 20<Year> (“Proposal”), attached as Exhibit C and incorporated herein, in response to the City’s RFP, and has affirmed its willingness and ability to provide such Architectural services on the terms and manner set forth in this Agreement.

NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, the Parties agree as follows:

1. Definitions. The following definitions apply to the body of this Agreement and Exhibit A unless otherwise indicated. Defined terms are capitalized in the Agreement with the exception of the words “day” and “including.”

1.1 Additional Services means Architectural services in addition to the Basic Services, which are provided pursuant to the City’s written request or prior written authorization.

1.2 Basic Services means those Architectural services necessary for design and construction of the Project, as specified in Exhibit A and in the RFP and Proposal.

1.3 Change Order means a written document approved and signed by the City after execution of the Construction Contract, which changes the scope of Work, the Construction Contract Price, or the Construction Contract Time.

1.4 City Engineer means the current or acting City Engineer and Director of Public Works for the City of Brentwood or his or her authorized delegee.

1.5 Construction Contract means the signed agreement between the City and Contractor, which includes and incorporates the Construction Documents.

1.6 Construction Contract Price means the total compensation to be paid to the Contractor for performance of the Work, as set forth in the Construction Contract.

1.7 Construction Contract Time means the time within which the Contractor is required to perform the Work, as set forth in the Construction Contract and as may be amended by Change Order.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 61 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 2

1.8 Construction Documents means all of the documents that are prepared following approval of the Design Development Documents for bidding and construction of the Project, as further detailed in Exhibit A.

1.9 Contractor means the individual, partnership, corporation, or other entity which has signed the Construction Contract with the City to perform the Work. “Contractor” includes the Contractor’s subcontractors, unless the context indicates otherwise.

1.10 Day means a calendar day unless otherwise specified.

1.11 Design Development Documents means detailed documents which are prepared following approval of the Schematic Design Documents, as further detailed in Exhibit A.

1.12 Design Documents means, collectively, the plans, drawings and specifications prepared or provided by the Architect for the Project at all design stages, including Schematic Design Documents, Design Development Documents and Construction Documents.

1.13 Including, whether or not capitalized, means “including; but not limited to” unless the context requires otherwise.

1.14 Project Manager means the City employee or representative with primary responsibility for overseeing design and construction of the Project and who will be Architect’s sole point of contact for the City unless otherwise stated. The Project Manager for this Project is Vatsal Patel.

1.15 Project Schedule means the detailed schedule developed by the Architect, and subject to the City’s approval, for design and construction of the Project, based on the Proposed Project Schedule provided in Exhibit A.

1.16 Proposed Project Schedule means the proposed Project schedule provided by the City in Exhibit A to this Agreement.

1.17 Rate Schedule means the schedule listing the hourly rates for Architect’s staff and rates for costs associated with providing the Services. The Rate Schedule is included in the Proposal.

1.18 Schematic Design Documents means preliminary drawings and related documents showing the Project’s basic components, scale and location, as further detailed in Exhibit A.

1.19 Services means all architectural and related services required under this Agreement, including all Basic Services and any authorized Additional Services.

1.20 Work means the Contractor’s construction and services necessary or incidental to constructing the Project in conformance with the requirements of the Construction Documents.

2. Scope of Services. Architect, acting in its capacity as an architect licensed under California law, will provide the Basic Services necessary to design and construct the Project in accordance with the City’s requirements, as set forth in Part One – Scope of Services in Exhibit A, and will provide those Additional Services, if any, as requested and authorized in writing by the City.

3. Personnel and Subconsultants. Architect will be responsible for employing or engaging all persons necessary to perform the Services. Architect will control the manner and means of the services to be performed by its employees and subconsultants. All of Architect's staff will be qualified by training and experience to perform their assigned tasks. Architect will give its personal attention to the fulfillment of the provisions of this Agreement by all of its employees and Architect, if any, and will keep the Services under its control. On demand of City, if any employee or Architect fails or refuses to carry out the provisions of DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 62 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 3
this Agreement or appears to be incompetent or to act in a disorderly or improper manner, he or she will be discharged immediately from the Services.

3.1 Architect’s Key Personnel. The Architect’s key personnel assigned to this Project, as specified in Architect’s Proposal, may not be changed without the prior written approval of the City. Architect must promptly notify the City in writing of any changes or proposed changes to the key personnel identified in the Proposal (or subsequently approved by the City), and of any changes to the contact information (telephone and email) for any key personnel.

3.2 Architect’s Principal Representative. Architect’s principal representative assigned to this Project is <Name and Title>, who will have full authority from Architect to receive and act on instructions from the City.

3.3 Subconsultants. Architect may not engage the services of any subconsultant for this Project, including, but not limited to, firms or individuals providing specialized architectural or engineering services, without obtaining the City’s prior written approval. The City’s approval must not be deemed to create any contractual relationship between the City and any such subconsultant, except that the City must be considered a third party beneficiary of such services for the Project. Architect must bind its subconsultants in the same manner as Architect is bound to the City under this Agreement, including, but not limited to, the insurance and indemnity requirements.

3.4 Warranty of Qualifications. Architect warrants and represents that Architect, its personnel, and its subconsultants are each duly qualified, licensed, and authorized by law to perform the Architectural and related services required under this Agreement.

4. Standard of Performance. Architect acknowledges that in entering into this Agreement the City is relying on Architect's special Architectural skills and experience to do and perform the Services. The Services provided by Architect pursuant to this Agreement must, at all times, meet or exceed the standard of care applicable to experienced, licensed civil engineers performing similar work in the area in which the Project is located. Similarly, the Services provided by any subconsultant must meet or exceed the standard of care applicable to others practicing in the subconsultant’s field and performing similar work in the area in which the Project is located. The acceptance of the Services by City does not release Architect from these obligations.

5. Term. Unless earlier terminated, the term of this Agreement will commence upon the date first above written and will expire upon completion of the Services by Architect.

6. Schedule.

6.1 Time is of the essence for providing the Services. Architect will generally adhere to the approved Project Schedule provided, that City will grant reasonable extensions of time for the performance of the Services occasioned by unusually lengthy governmental reviews of Architect’s work product or other unavoidable delays occasioned by unforeseen circumstances; provided, further, that such unavoidable delay will not include strikes, lockouts, work stoppages, or other labor disturbances conducted by, or on behalf of, Architect’s officers or employees.

6.2 Architect acknowledges the importance to City of City’s Project Schedule and agrees to put forth its best professional efforts to perform the Services in a manner consistent with that schedule.

City understands, however, that Architect’s performance must be governed by sound practices. Architect will work such overtime or engage such personnel and equipment as necessary to maintain the schedule, without additional compensation.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 63 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 4

7. Compensation.

7.1 The total fee payable for the Basic Services to be performed during the term of this Agreement will be based on the Rate Schedule, for a not to exceed amount of <Amount in Words> dollars ($<Amount in Numerals>), including authorized expense reimbursements, or as otherwise specified in Exhibit A. Any authorized Additional Services will be paid for based on the Rate Schedule. No other compensation for the Services will be allowed except for items covered by subsequent amendments to this Agreement. The City reserves the right to withhold a ten percent (10%) retention until City has accepted the Services.

7.2 Payment will occur only after receipt by City of invoices sufficiently detailed to include hours performed, hourly rates, and related activities and costs for approval by City.

7.3 Within thirty (30) days after receipt of any applicable progress payment request, City will verify the accuracy of the request, correct the charges where appropriate, and make payment to Architect in an amount equal to the amount of such application, as verified or corrected by City. No payment made prior to completion and acceptance of the Services will constitute acceptance of any part of the Services.

City reserves the right to withhold payment from Architect on account of Services not performed satisfactorily, delays in Architect's performance of Services, or other defaults hereunder.

8. Status of Architect.

8.1 Architect will perform the Services in Architect's own way, by controlling the manner and means of the work City needs completed, and pursuant to this Agreement as an independent contractor and in pursuit of Architect's independent calling, and not as an employee of City. The persons used by Architect to provide the Services under this Agreement will not be considered employees of City for any purposes whatsoever.

8.2 The payment made to Architect pursuant to the Agreement will be the full and complete compensation to which Architect is entitled. City will not make any federal or state tax withholdings on behalf of Architect or its agents, employees or subconsultants. City will not pay any workers' compensation insurance, retirement contributions or unemployment contributions on behalf of Architect or its employees or subconsultants. Architect agrees to indemnify and pay City within thirty (30) days for any tax, retirement contribution, social security, overtime payment, unemployment payment or workers' compensation payment, including, but not limited to, those based on any provision of the Federal Affordable Care Act, which City may be required to make on behalf of Architect or any agent, employee, or subconsultant of Architect for work done under this Agreement. At the City’s election, City may deduct the amounts paid pursuant to this Section, from any balance owing to Architect.

9. Subcontracting. Architect's services are being requested by City because they are unique and personal. Except as may be specified in Exhibit A, Architect will not subcontract any portion of the Services without prior written approval of City Manager or his/her designee. If Architect subcontracts any of the Services, Architect will be fully responsible to City for the acts, errors and omissions of Architect's subconsultant and of the persons either directly or indirectly employed by the subconsultant, as Architect is for the acts and omissions of persons directly employed by Architect. Nothing contained in this Agreement will create any contractual relationship between any subconsultant of Architect and City. Architect will be responsible for payment of subconsultants. Architect will bind every subconsultant and every subconsultant of a subconsultant by the terms of this Agreement applicable to Architect's work unless specifically noted to the contrary in the subcontract and approved in writing by City.

10. Other Architects. The City reserves the right to employ other consultants in connection with the Project or the Services.

11. Indemnification. Architect agrees to indemnify, including the cost to defend, City, its officers, agents, volunteers and employees from any and all claims, demands, costs or liability (collectively, “Liability”) that arise out of, or pertain to, or relate to the negligence, recklessness, or willful misconduct of DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 64 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 5
Architect and its agents in the performance of Services under this Agreement, but this indemnity does not apply to Liability caused by the active negligence, sole negligence or willful misconduct of City. This indemnification obligation is not limited by any limitation on the amount or type of damages available under any applicable insurance coverage and will survive the expiration or termination of this Agreement with respect to any Liability arising from or caused during the term of the Agreement.

12. Insurance. Architect will obtain and maintain, at its cost and expense, for the duration of the Agreement and any and all amendments, insurance against claims for injuries to persons or damage to property which may arise out of or in connection with performance of the Services by Architect or Architect’s agents, representatives, employees or subconsultants. The insurance will be obtained from an insurance carrier admitted and authorized to do business in the State of California. The insurance carrier is required to have a current Best's Key Rating of not less than "A:VII."

12.1 Coverages and Limits. Architect will maintain the types of coverages and minimum limits indicated below, unless Risk Manager or City Manager, in consultation with the City Attorney approves a lower amount. These minimum amounts of coverage will not constitute any limitations or cap on Architect's indemnification obligations under this Agreement. City, its officers, agents, volunteers and employees make no representation that the limits of the insurance specified to be carried by Architect pursuant to this Agreement are adequate to protect Architect. The coverage will contain no special limitations on the scope of its protection to the above-designated insureds except for Workers Compensation and errors and omissions insurance. Architect will obtain occurrence coverage, excluding Professional Liability, which will be written as claims-made coverage. If Architect believes that any required insurance coverage is inadequate, Architect will obtain such additional insurance coverage, as Architect deems adequate, at Architect's sole expense.

12.1.1 Commercial General Liability Insurance. $2,000,000 combined single-limit per occurrence for bodily injury, personal injury and property damage. If the submitted policies contain aggregate limits, general aggregate limits will apply separately to the work under this Agreement or the general aggregate will be twice the required per occurrence limit.

12.1.2 Automobile Liability. $1,000,000 combined single-limit per accident for bodily injury and property damage.

12.1.3 Workers' Compensation and Employer's Liability. Workers' Compensation limits as required by the California Labor Code and Employer's Liability limits of $1,000,000 per accident for bodily injury. Workers' Compensation and Employer's Liability insurance will not be required if Architect has no employees and provides, to City's satisfaction, a declaration stating this.

12.1.4 Professional Liability. Errors and omissions liability appropriate to Architect’s profession with limits of not less than $1,000,000 per claim. The professional liability insurance must include prior acts coverage.

12.2 Endorsements. For Commercial General Liability Insurance, Architect will ensure that the policies are endorsed to name the City, its officers, agents, volunteers and employees as additional insureds. Prior to City's execution of this Agreement, Architect will furnish certificates of insurance and endorsements to City.

12.3 Cancellation. Insurance will be in force during the life of the Agreement and any extensions of it and will not be canceled without thirty (30) days prior written notice to City sent pursuant to the notice provisions of this Agreement.

12.4 Failure to Maintain Coverage. If Architect fails to maintain any of these insurance coverages, then City will have the option to declare Architect in breach of this Agreement, or may purchase replacement insurance or pay the premiums that are due on existing policies in order to maintain the required coverages. Architect is responsible for any payments made by City to obtain or maintain insurance DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 65 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 6
and City may collect these payments from Architect or deduct the amount paid from any sums due Architect under this Agreement.

12.5 Submission of Insurance Policies. City reserves the right to require, at any time, complete and certified copies of any or all required insurance policies and endorsements.

12.6 Primary Coverage. For any claims related to the Services and this Agreement, the Architect’s insurance coverage will be primary insurance with respect to City, its officers, agents, volunteers and employees. Any insurance or self-insurance maintained by City for itself, its officers, agents, volunteers and employees, will be in excess of Architect’s insurance and not contributory with it.

12.7 Reduction in Coverage/Material Changes. Architect will notify City in writing pursuant to the notice provisions of this Agreement thirty (30) days prior to any reduction in any of the insurance coverage required pursuant to this Agreement or any material changes to the respective insurance policies.

12.8 Waiver of Subrogation. The policies shall contain a waiver of subrogation for the benefit of City.

13. Business License. Architect will obtain and maintain a City of Brentwood Business License for the term of the Agreement, as it may be amended from time-to-time.

14. Maintenance of Records. Architect will maintain complete and accurate records with respect to costs incurred under this Agreement. All records will be clearly identifiable. Architect will allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of records and any other documents created pursuant to this Agreement. Architect will allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

15. Ownership of Documents.

15.1 All product produced by Architect or its agents, employees, and subcontractors pursuant to this Agreement (the “Work Product”) is the property of City. In the event this Agreement is terminated, all Work Product produced by Architect or its agents, employees and subcontractors pursuant to this Agreement will be delivered to City pursuant to the termination clause of this Agreement. Architect will have the right to make one (1) copy of the Work Product for Architect’s records.

15.2 The Work Product may be used by City and its agents, employees, representatives, and assigns, in whole or in part, or in modified form, for all purposes City may deem advisable, without further employment of or payment of any compensation to Architect; provided, however, that if this Agreement is terminated for any reason prior to completion of the Project and if under such circumstances City uses, or engages the services of and directs another Architect to use, the Work Product, City agrees to hold Architect harmless from any and all liability, costs, and expenses relative to claims arising out of matters and/or events which occur subsequent to the termination of this Agreement as a result of causes other than the fault or negligence of Architect, or anyone for whose acts it is responsible, in preparation of the Work Product. Architect will not be responsible for deficiencies solely attributable to modifications of the Work Product performed by others, or that arise from use of the Documents in connection with a project or site other than that shown in the Work Product.

16. Copyrights. Architect agrees that all copyrights that arise from the Services will be vested in City and Architect relinquishes all claims to the copyrights in favor of City.

17. Confidentiality. All documents, reports, information, data, and exhibits prepared or assembled by Architect in connection with the performance of the Services pursuant to the Agreement are confidential until released by the City to the public, and the Architect will not make any of these documents or information available to any individual or organization not employed by the Architect or the City without the written consent of the City before any such release.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 66 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 7

18. Notices. Any notices relating to this Agreement shall be given in writing and shall be deemed sufficiently given and served for all purposes when delivered personally, by facsimile or by generally recognized overnight courier service, or five (5) days after deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, addressed as follows:

For City:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Phone No. (925) 516-5307
Attn: Vatsal Patel
Email: [email protected]
For Architect:

Name:

Title:

Address:

Phone No.:

Attn:

Email:__________________________
Either Party may change its address for purposes of this section by giving the other Party written notice of the new address in the manner set forth above.

19. Conflicts of Interest.

19.1 City will evaluate Architect’s duties pursuant to this Agreement to determine whether disclosure under the Political Reform Act and City’s Conflict of Interest Code is required of Architect or any of Architect’s employees, agents, or subcontractors. Should it be determined that disclosure is required, Architect or Architect’s affected employees, agents, or subconsultants will complete and file with the City Clerk those schedules specified by City and contained in the Statement of Economic Interests Form 700.

19.2 Architect understands that its professional responsibility is solely to City. Architect warrants that it presently has no interest, present or contemplated, and will not acquire any direct or indirect interest, that would conflict with its performance of this Agreement. Architect further warrants that neither Architect, nor Architect’s agents, employees, subcontractors and Architects have any ancillary real property, business interests or income that will be affected by this Agreement or, alternatively, that Architect will file with the City an affidavit disclosing this interest. Architect will not knowingly, and will take reasonable steps to ensure that it does not, employ a person having such an interest in the performance of this Agreement. If after employment of a person, Architect discovers that it has employed a person with a direct or indirect interest that would conflict with its performance of this Agreement, Architect will promptly disclose the relationship to the City and take such action as the City may direct to remedy the conflict.

20. General Compliance with Laws. Architect will keep fully informed of federal, state and local laws and ordinances and regulations which in any manner affect those employed by Architect, or in any way affect the performance of the Services by Architect. Architect will at all times observe and comply with these laws, ordinances, and regulations and will be responsible for the compliance of the Services with all applicable laws, ordinances and regulations.

21. Pandemic Health Laws. Architect’s duty to comply with Laws includes compliance by Architect and Subcontractors with all local, state, or federal Laws that have been or may be enacted in response to the COVID-19 pandemic (collectively, “Health Laws”), which include all of the County of Contra Costa Health Orders. Failure to fully comply with the Health Laws constitutes a material default, subject to all available remedies including suspension or termination.

22. Discrimination and Harassment Prohibited. Architect will comply with all applicable local, state and federal laws and regulations prohibiting discrimination and harassment.

23. Termination. In the event of the Architect's failure to prosecute, deliver, or perform the Services, City may terminate this Agreement for nonperformance by notifying Architect in writing pursuant to the notice provisions of this Agreement. Architect has five (5) business days to deliver any documents owned by City and all work in progress to City address contained in this Agreement. City will make a determination DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 67 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 8
of fact based upon the work product delivered to City and of the percentage of work that Architect has performed which is usable and of worth to City in having the Agreement completed. Based upon that finding City will determine the final payment of the Agreement. In the event City elects to terminate, City will have the right to immediate possession of all Work Product and work in progress prepared by Architect, whether located at the project site, at Architect's place of business, or at the offices of a subconsultant.

Either Party, upon tendering thirty (30) calendar days written notice to the other Party, may terminate this Agreement for convenience. In this event and upon request of City, Architect will assemble the work product without charge and put it in order for proper filing and closing and deliver it to City. Architect will be paid for work performed to the termination date; however, the total will not exceed the lump sum fee payable under this Agreement. City will make the final determination as to the portions of tasks completed and the compensation to be made.

24. Covenants Against Contingent Fees. Architect warrants that Architect has not employed or retained any company or person, other than a bona fide employee working for Architect, to solicit or secure this Agreement, and that Architect has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift, or any other consideration contingent upon, or resulting from, the award or making of this Agreement. For breach or violation of this warranty, City will have the right to terminate this Agreement for nonperformance, or, in its discretion, to deduct from the Agreement price or consideration, or otherwise recover, the full amount of the fee, commission, percentage, brokerage fees, gift, or contingent fee.

25. Claims And Lawsuits. By signing this Agreement, Architect agrees that any Agreement claim submitted to City must be asserted as part of the Agreement process as set forth in this Agreement and not in anticipation of litigation or in conjunction with litigation. Architect acknowledges that if a false claim is submitted to City by Architect, it may be considered fraud and Architect may be subject to criminal prosecution. Architect acknowledges that California Government Code sections 12650 et seq., the False Claims Act, applies to this Agreement and, provides for civil penalties where a person knowingly submits a false claim to a public entity.

26. Jurisdiction, Venue and Governing Law. Any action at law or in equity brought by either of the Parties for the purpose of enforcing a right or rights provided for by this Agreement will be tried in a court of competent jurisdiction in the County of Contra Costa, State of California, and the Parties waive all provisions of law providing for a change of venue in these proceedings to any other county. This Agreement will be governed by the laws of the State of California.

27. Testimony. Architect will testify at City's request if litigation is brought against City in connection with Architect's services under this Agreement. Unless the action is brought by Architect, or is based upon Architect's actual or alleged negligence or other wrongdoing, City, upon prior written agreement with Architect will compensate Architect for time spent in preparation for testimony, testimony, and travel at Architect's standard hourly rates at the time of actual testimony.

28. Successors and Assigns. It is mutually understood and agreed that this Agreement will be binding upon the Parties and their respective successors. Neither this Agreement nor any part of it nor any monies due or to become due under it may be assigned by Architect without the prior written consent of City, which will not be unreasonably withheld.

29. Section Headings. Section headings as used in this Agreement are for convenience only and will not be deemed to be a part of such sections and will not be construed to change the meaning of the section.

30. Waivers. The waiver by either Party of any breach or violation of any term, covenant, or condition of this Agreement or of any applicable law will not be deemed to be a waiver of such term, covenant, condition or law or of any subsequent breach or violation of same or of any other term, covenant, condition or law. The acceptance by either Party of any fee or other payment which may become due under this Agreement will not be deemed to be a waiver of any preceding breach or violation by the other Party of any term, covenant, or condition of this Agreement or any applicable law.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 68 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 9

31. Entire Agreement and Order of Precedence. This Agreement, together with any other written document referred to or contemplated by it embody the entire Agreement and understanding between the Parties relating to the subject matter of it. The City Manager is authorized, in consultation with the City Attorney, to agree to non-material amendments to this Agreement. Neither this Agreement nor any of its provisions may be amended, modified, waived or discharged except in a writing signed by both Parties.

Notwithstanding that the RFP and Proposal are incorporated into this Agreement as Exhibit B and Exhibit C, respectively, if any provision in the Proposal or the RFP differs from or is inconsistent with the terms of this Agreement, including Exhibit A, the terms of this Agreement, including Exhibit A, will take precedence over any such differing or inconsistent provision. Likewise, to the extent any terms in the Proposal differ from or are inconsistent with the terms of the RFP, the terms of the RFP will take precedence over any differing or inconsistent terms in the Proposal.

32. Authority. The individuals executing this Agreement and the instruments referenced in it on behalf of Architect each represent and warrant that they have the legal power, right and actual authority to bind Architect to the terms and conditions of this Agreement. [Signatures on the following page]
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 69 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 10

33. Severability. If any term, provision, condition or covenant of this Agreement or its application to any Party or circumstances shall be held, to any extent, invalid or unenforceable, the remainder of this Agreement, or the application of the term, provision, condition or covenant to persons or circumstances other than those as to whom or which it is held invalid or unenforceable, shall not be affected, and shall be valid and enforceable to the fullest extent permitted by law.

34. Signatures.

34.1 Counterparts. This Agreement may be executed in two or more counterparts, each of which together will be deemed an original, but all of which together will constitute the same instrument.

34.2 Digital/Electronic Signatures. Using a City-approved method, this Agreement may be executed through the use of digital or electronic signatures in accordance with Government Code Section

16.5. The presence of an electronic signature on this Agreement will be construed as the Parties’ consent to do business electronically.

ARCHITECT:
* By:

Printed Name:

Title:
** By:

Printed Name:

Title:

CITY:

By:

Tim Y. Ogden, City Manager
ATTEST:

By:

Margaret Wimberly, City Clerk
APPROVED AS TO FORM:

By:

Its:

If required by City, proper notarial acknowledgment of execution by Architect must be attached. If a Corporation, Agreement must be signed by one corporate officer from each of the following two groups. *Group A. **Group B.

Chairman, Secretary,
President, or Assistant Secretary,
Vice-President CFO or Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation.

If an LLC:
• The Agreement must be signed by a Managing Member or the LLC must attach a resolution empowering the signatory to bind the LLC.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 70 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 11
If a partnership:
• The Agreement must be signed by the Managing Partner or the Partner authorized to execute agreements of this type. Additional documentation, such as the partnership agreement, confirming this signature authority may be required.

If a sole proprietorship:
• The Agreement must be signed by the owner.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 71 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 12

AGREEMENT FOR ARCHITECTURAL SERVICES
<Name of Architect>
Water and Wastewater Laboratory Project, CIP No. 592-59207 EXHIBIT “A”

PART ONE - SCOPE OF SERVICES

1. General. Architect must provide Architectural design and related services for the Project, as more particularly described in the RFP and Proposal, including and subject to the following general requirements.

1.1 Preliminary Design Conference. Following the City’s execution of this Agreement, or as otherwise specified in Exhibit A, Architect must attend a preliminary design conference with the Project Manager. At the request of the Project Manager, the Architect must submit written minutes of the preliminary design conference in order to demonstrate its understanding of the Project requirements.

1.2 City Approval. Architect may not proceed with the development of successive Design Documents, as detailed below in Section 2, until it has received written approvals from the City. Architect must promptly review and revise the following to the City’s satisfaction, without additional compensation:
(A) Design Documents submitted for City approval and to which the City has objections; and
(B) Design Documents which have been determined by the City to present excessive cost or constructability problems.

1.3 Governmental Approval. Architect must assist the City with obtaining the required approvals from applicable governmental agencies with jurisdiction over the Project.

1.4 Architect will control the manner and the means of the services to be provided, and be responsible for the professional quality, technical accuracy and coordination of the Services. Architect will, without additional compensation, correct or revise any errors or deficiencies in the Services.

1.5 Architect will keep City informed on a regular basis that the Services are being performed in accordance with the requirement and intentions of this Agreement.

2. Basic Services. In addition to the tasks specified in the RFP and Proposal, Architect’s Basic Services include the following:

2.1 Project Schedule. Following the City’s execution of this Agreement, Architect must prepare and submit for the City Engineer’s review and approval a preliminary Project Schedule, based on the Proposed Project Schedule included in in Part Two, below,, showing the timing and sequencing of the major design and construction phases required to complete the Project. The preliminary Project Schedule should include times for completion of all major phases of environmental procedures, if applicable; design; bidding; construction; final close out; or as otherwise specified by the Project Manager. The Project Schedule must be updated for the City Engineer’s review and approval upon completion of each major phase included in the Project Schedule.

2.2 Cost Estimate. Following the City’s execution of this Agreement, Architect must prepare and submit for the City Engineer’s review and approval a preliminary estimate of the cost to construct the Project. As the design process progresses, Architect must submit updates to the preliminary cost estimate for the City’s approval concurrent with its submission of the Schematic Design Documents, Design Development Documents, and Construction Documents, respectively. If at any time, an updated cost estimate exceeds the City’s previously approved cost estimate, Architect must provide the City with recommendations for constructing the Project within the City’s budget.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 72 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 13

2.3 Schematic Design Documents. Within the time specified in the approved Project Schedule, Architect must prepare and submit for the City Engineer’s review and approval Schematic Design Documents consisting of drawings, outline specifications, and other documents showing the Project’s basic components, scale, and location on the Project site. The Schematic Design Documents must include, to the extent applicable, conceptual plans of the Project site and improvements; preliminary sections and elevations; approximate areas, volumes, and dimensions; and preliminary selections of materials and systems. The Schematic Design Documents and updated cost estimate may be submitted electronically to the Project Manager, unless the Project Manager specifically requests two printed sets and one reproducible set of the Schematic Design Documents.

2.4 Design Development Documents. Based on the approved Schematic Design Documents and within the time specified in the approved Project Schedule, Architect must prepare for the City Engineer’s review and approval the Design Development Documents. The Design Development Documents must further define the Project, including drawings and outline specifications fixing and describing the Project size, character and site relationships, and other appropriate elements describing the structural, engineering, mechanical and electrical systems, as applicable. The Design Development Documents must include, as applicable, plans, sections and elevations; criteria and sizing of major components; equipment sizes and capacities and approximate layouts, including required spaces and clearances; typical details; materials selections and general quality levels. When submitting the Design Development Documents for the City Engineer’s approval, the Architect must identify in writing all material changes and deviations, if any, that have taken place since approval of the Schematic Design Documents, including, but not limited to, changes to the last updated cost estimate and the approved Project Schedule.

The Design Development Documents and updated cost estimate may be submitted electronically to the Project Manager, unless the Project Manager specifically requests two printed sets and one reproducible set of the Design Development Documents.

2.5 Construction Documents. Based on the approved Design Development Documents and within the time specified in the approved Project Schedule, Architect must prepare for the City Engineer’s review and approval, and required governmental agency approval(s), if applicable, Construction Documents setting forth in detail the quality levels of and the requirements for construction of the Project, and consisting of drawings and technical specifications that comply with all applicable codes, laws, ordinances and regulations in effect at the time of their preparation at the location of the Project, and as further specified in the RFP. The Construction Documents must be submitted to the City Engineer in electronic form, ready to be added to the front end documents, which will be prepared by the City using the City’s approved front end documents. When submitting the Construction Documents for the City Engineer’s approval, the Architect must identify in writing all material changes and deviations, if any, that have taken place since approval of the Design Development Documents including, but not limited to, changes to the last updated cost estimate and the approved Project Schedule. The Construction Documents and updated cost estimate may be submitted electronically to the Project Manager, unless the Project Manager specifically requests two printed sets and one reproducible set of the Construction Documents.

2.6 Bidding Phase Services. Architect must assist the City during the bidding phase, including, if applicable, prequalification of bidders; conducting pre-bid meetings or site walks; issuance of addenda; bid review; and review of bid protests. If the lowest responsive bid exceeds the final approved construction cost estimate by twenty-five percent or more, and the City, acting in its sole discretion decides to reject all bids and re-bid the Project, Architect must, at no additional cost to the City, work with the City to make the modifications to the Construction Documents to reduce the cost of construction so as not to exceed the previously approved construction cost estimate by more than the stated additional percentage.

2.7 Construction Phase Services. During the Construction Phase the Architect must provide the following services to the City, as more particularly specified in Exhibit A:
(A) General administration of the Construction Contract including: review and advise the Project Manager as to the accuracy and reasonableness of Contractor’s schedule of values; coordinate the Project Schedule with the Contractor’s Work schedule; provide prompt and complete responses to DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 73 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 14
Contractor’s requests for information; and coordinate efforts with the Project Manager to ensure the Project is completed in a timely, cost-effective manner, consistent with the City’s requirements. (B) Ongoing design services as needed, including: interpretations and clarifications of the Construction Documents provided by the Architect; and preparation of design details for Change Orders, as needed for the proper execution and progress of the Work and consistent with the intent of the approved Construction Documents.
(C) Architect must timely review Contractor’s design-related submittals, including shop drawings, product data and samples, and issue written approvals of and/or recommendations to the City within ten days of receipt of each such submittal, unless additional time is required based on the nature of the submittal, in which case the review must be completed as soon as practicable under the circumstances.

Architect must check the submittals for compliance with the approved Construction Documents. Architect’s review must not extend to the Contractor’s means, methods, techniques, sequences, or procedures, unless such have previously been specified in the Construction Documents. (D) Architect must assist the Project Manager in evaluating whether to recommend approval of requests for changes in the Work, and, if applicable, must assist with preparing proposed Change Orders.
(E) Architect must visit the Project site at intervals sufficient to monitor the progress and quality of the Work and to determine whether the Work is proceeding in conformance with the Construction Documents. Following each Project site visit, Architect must promptly provide the Project Manager with a written report of Architect’s observations and recommendations, if any. If Architect becomes aware of any defects or deficiencies in the Work, Architect must provide prompt notice to the Project Manager, followed by written confirmation of that notice. If, in Architect’s opinion, special testing or inspection of the Work is needed, Architect must recommend appropriate procedures and Architects to the City. Architect is not responsible for Contractor’s safety precautions and programs. However, if Architect has knowledge of safety violations, Architect must give prompt notice to the City of such violations. (F) Architect must assist the City in evaluating the Contractor’s payment applications in accordance with the Construction Documents. Based on on-site observations and review of other relevant information, Architect must evaluate whether the Work has progressed to the point indicated in the payment application. Architect’s review must include review of the status of the Contractor’s record drawings.
(G) Architect must attend meetings with the Project Manager and Contractor(s) prior to and during construction as follows: twice monthly progress meetings. (H) Architect must prepare and submit reports on the progress or status of the Work to the Project Manager as specified: Monthly invoicing emailed to Accounts Payable, [email protected], with copies to Vatsal Patel, [email protected] and Renee Payette, [email protected].
(I) Architect must conduct inspections reasonably necessary to determine whether Contractor has achieved final completion of the Work in accordance with the Construction Contract, and must prepare a list of items to be completed or corrected (the “punch list”), including estimates of the cost for the City to correct or complete each punch list item, as well as required final submittals (e.g., warranties, manuals, as-built drawings, etc.) in order to achieve final completion.

2.8 Close Out and Post-Construction Services
(A) Architect must promptly perform all tasks reasonably necessary for Project close out. If requested, Architect must provide the City with a color schedule of all finished materials incorporated into the Project.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 74 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 15
(B) If requested by the City, Architect must visit the Project site during the warranty period to advise the City on the need for warranty work, as determined by the City. (C) All Project plans, including, but not limited to, record drawings, specifications, and estimates prepared pursuant thereto, must be and remain the property of the City for the purposes of repair, maintenance, renovation, modernization, or other purposes, only as they relate to the Project. The City reserves the right to use the Construction Documents, record drawings, or estimates related to the Project for the purposes of additions, alignments, or other development on or near the site or elsewhere in the City.

Nothing in this provision is intended to transfer or waive Architect’s copyrights over these documents, including, but not limited to, all common law, statutory, and other reserved rights, unless transferred or waived in writing by Architect. Notwithstanding the foregoing, if the City proposes to reuse the Construction Documents, in whole or in part, the City and Architect will specify the terms and conditions for the reuse in this Agreement by an amendment or addendum.

3. Additional Services. If not expressly included in Basic Services, as specified above or in RFP or the Scope of Services in Exhibit A, the following services must be provided by Architect and will be paid for as Additional Services, subject to prior written authorization by the City:

3.1 Investigation of financing or other special studies to determine the financial feasibility of the Project.

3.2 Consultations, negotiation, and the like for procurement of Project financing.

3.3 Investigation of or measured drawings of existing conditions or improvements or verification of the accuracy of the City-provided drawings or other information on existing conditions.

3.4 Surveys, site evaluations, or legal descriptions.

3.5 Soils, subsurface and environmental studies, reports and investigations required by outside agencies with jurisdiction over the Project.

3.6 Revisions to the City-approved Construction Documents which are required due to circumstances outside of Architect’s control.

3.7 Design, coordination, management, expediting and other services for the procurement of materials to be obtained or work to be performed by the City, including, but not limited to technology or other specialty systems which are not otherwise required by this Agreement.

3.8 Estimates, appraisals, consultations, and related services required for the repair or replacement of an insured loss.

3.9 Preparing for or providing expert witness services or participation in out-of-court dispute resolution in connection with any Project-related dispute or adversarial proceeding to which the Architect is not a party, or potential party.

3.10 Out of town travel in connection with the Services, other than travel between Architect’s office, the City’s offices, and the Project site.

3.11 The City-requested services which are not included in Basic Services and are not customarily provided as part of generally accepted Architectural design services for this type of project and the region in which the Project is located.

3.12 Extended services required by non-performance, suspension, termination, or default of the Contractor in the performance of the Work, through no fault of Architect.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 75 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 16

3.13 Preparation of special models, renderings or mock-ups, which are not included in Basic Services.

3.14 Other services as agreed to by the Parties as set forth in written amendment or addendum to this Agreement.

4. References. Architect’s Services, including preparation of the Design Documents, should be informed and guided by the information or requirements included in the following document(s):

1. Preliminary Design Report

2. Environmental Clearance Document

3. Geotechnical Report

4. Utility Maps

5. Any other applicable document(s) that may assist in the design and/or construction

PART TWO - PROPOSED PROJECT SCHEDULE
Activity Tentative Date(s)
Preliminary Design Conference March 2024
Submit Preliminary Project Schedule March 2024
Submit Schematic Design Documents May 2024
Submit Design Development Documents July 2024
Submit Construction Documents October 2024
Publication of Bid Notice December 2024
Bid Opening January 2025
Award Construction Contract February 2025
Begin Construction March 2025
Project Completion December 2025
Project Closeout January 2026
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 76 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 17

AGREEMENT FOR ARCHITECTURAL SERVICES
EXHIBIT “B”

REQUEST FOR PROPOSALS
City of Brentwood
Water and Wastewater Laboratory Project, CIP No. 592-59207 [Attach City’s RFP, including any exhibits thereto.]
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 77 of 244 ends

SAMPLE
Exhibit A
City Attorney Approved Version 040821 18

AGREEMENT FOR ARCHITECTURAL SERVICES
EXHIBIT “C”

PROPOSAL
<Name of Architect>
City of Brentwood
Water and Wastewater Laboratory Project, CIP No. 592-59207 [Attach Architect’s Proposal, including any exhibits thereto.] DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 78 of 244 ends

City of Brentwood
Request for Proposals
Page | 7
City Attorney Approved Version 060120
Exhibit B – Scope of Services
The Water and Wastewater Laboratory Project (“Project”) is a Capital Improvement Program project that will construct a new, larger laboratory for the water and wastewater systems on the City’s Wastewater Operations Administrative Building (“Admin Building”) site located at 2251 Elkins Way, Brentwood.

The existing laboratory was constructed in 2002 as part of the Admin Building, which includes three (3) workstations and an area for sampling, testing, and analysis. However, it has become outdated, outgrown its current footprint, and is not expandable within the Admin Building.

Therefore, the Project would construct a new, larger laboratory to provide adequate laboratory space for future build-out conditions within the City’s Municipal Services Corporation Yard. The new laboratory space will be located behind the existing Admin Building, see site maps herein attached as Exhibit C.

The new laboratory shall include spaces for staff, sampling and testing, work areas for equipment, and storage. The basic design of the new laboratory should include, but not be limited to: two (2) offices for the Lab Supervisor and the Environmental Compliance Inspector; three (3) cubicle workstations for the Lab Technicians; Sampling Room for the storage, preparation, and supplies of the test samples as well as refrigerators for storage of test samples; Microbiology and Ionchromatography Rooms for testing and analysis of water and wastewater; an open space in the center for a work area and various lab equipment; a separate Storage Room for general and records storage; and be designed to meet all applicable codes, regulations, and City standards.

The exterior finish shall be consistent with that of the Admin Building and other structures within the City’s Municipal Services Corporation Yard.

Design Services
All design services work that will be necessary to complete the Project from design, construction, and close-out shall be done under the supervision of, and stamped by a Professional Architect licensed in the State of California. The scope of design services work shall include, but not be limited to:
• Preparing all reports that are necessary to acquire permits from various agencies such as, Air Resources Board for Authority to Construct and Operate and the Regional Water Quality Control Board for Construction Stormwater Permits; • Preparing a Preliminary Design Report that includes as a minimum a project summary, design criteria, site master plan, exterior and interior circulation, connection to the existing Admin Building, laboratory access, geotechnical analysis and assessment, architectural and structural design criteria, overview of electrical, instrumentation and control requirements, National Pollutant Discharge Elimination System (“NPDES”) permit compliance, project schedule, and construction cost estimate; • Preparing a minimum of three (3) layout alternatives. Layouts to be presented and reviewed by the City. Modify the selected layout to finalize, as needed; DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 79 of 244 ends

City of Brentwood
Request for Proposals
Page | 8
City Attorney Approved Version 060120
• Preparing design development documents; such as, site plan, layout and sections, interior and exterior elevations, wall sections, reflected ceiling plan, building systems plans, outline specifications for basic materials and systems, material samples, color board, and exterior rendering;
• Meeting with City to develop and implement sustainability standards; • Participating in PG&E’s Savings by Design program to ensure an energy-efficient design; and
• Preparing Construction Documents (Plans, Specifications, and Construction Cost Estimates):
o Prepare 30%, 60%, 90%, 100% design submittal plans, technical specifications, and construction cost estimates;
o Prepare Geotechnical Report to be used during design and support all new facilities to be constructed;
o Prepare civil design, including all underground utilities, grading, earthwork calculations, erosion control, and paving. Civil design shall also evaluate the most appropriate means for compliance with General Permit for Storm Water Discharges Associated with Industrial Activities Order NPDES No. CAS000001; o Prepare landscaping, lighting, and security design for the surrounding area; o Design all architectural, structural, mechanical, electrical, and plumbing for all structures and facilities to be constructed;
o Design for compliance with the Americans with Disabilities Act; o Prepare and complete Title 24 calculations; and
o Assist the City of Brentwood Building Division’s Building Permit process:
 Review and prepare responses to the plan check comments.  Prepare revisions to the construction documents for resubmittal.  Attend in meetings to discuss plan check comments, as needed.

The City requires two (2) hard copies and electronic (PDF) formats.

Environmental Clearance & Document
A California Environmental Quality Act analysis including the Initial Study and Mitigated Negative Declaration document is being completed and prepared concurrently by the City’s Environmental Consultant.

The selected design firm is to work closely with the City’s Environmental Consultant to ensure all the processes, design criteria discussed and required permits for construction in the finalized document are addressed appropriately, as needed. The document is expected to be finalized either before the design begins or at the latest, before the Preliminary Design Report is due.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 80 of 244 ends

City of Brentwood
Request for Proposals
Page | 9
City Attorney Approved Version 060120
Surveying
All survey work shall be performed under the supervision of a Licensed Surveyor to practice land surveying in the State of California. The scope of surveying services required for this project includes, but is not limited to:
• Preparing all topographic surveys needed to study and design this project, 20-scale with 1-ft contours;
• Preparing topographic maps;
• Providing necessary office and field documentation to the City; • Preparing control surveys (horizontal and vertical, vertical datum set to NAVD88); • Completing construction staking; and
• Certifying building pad (for elevation); and
• Setting new monuments for the City’s Municipal Services Corporation Yard, as needed.

In addition to hard copies, all survey data will be provided to the City in a digital drawing file compatible with Auto CAD 2012 or newer version.

Local Agencies and Utility Coordination
Coordinating with all affected local agencies and utilities is essential to the success of this Project.

The following is a list of the local agencies and utilities that may be affected by this Project:
• Pacific Gas and Electric (PG&E);
• AT&T;
• Comcast;
• Contra Costa County Flood Control District;
• Contra Costa Fire District Protection District; and
• City of Brentwood - sewer, potable and non-potable water, storm drain, fiber optic, SCADA, landscape, irrigation, street lights and City-owned electrical and gas lines, as well as building and electrical permits.

The scope of this Project includes all coordination with affected local agencies and utilities including those not mentioned above that may have facilities or jurisdiction within the Project area.

All utilities shall be clearly identified in the plans.

Project Timeline
RFP Available from City January 5, 2024
Mandatory Pre-Submittal Meeting January 23, 2024 at 10:00 a.m.

Request for Information Deadline January 31, 2024 no later than 5:00 p.m.

Proposal Deadline February 9, 2024 no later than 4:00 p.m.

Anticipated Award of Contract March 12, 2024
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 81 of 244 ends

City of Brentwood
Request for Proposals
Page | 10
City Attorney Approved Version 060120
Notice to Proceed to Consultant March 26, 2024
Estimated Design Completion October 12, 2024
Bid Documents Available November 12, 2024
Bid Opening January 7, 2025
Award of Construction Contract February 11, 2025
Design Deliverable Milestones
Preliminary Design Report May 12, 2024
30% design with preliminary cost estimate July 12, 2024 60% design with detailed cost estimate August 12, 2024
90% design, draft specifications with detailed cost estimate September 12, 2024 100% Final design, specifications with detailed cost estimate October 12, 2024 Project Management
The selected design firm shall assign a project manager to manage all aspects of this Project and shall not change or reassign said person without prior written notice to City, nor replace individuals to whom City has a reasonable objection. The assigned project manager will be the primary contact for City staff. The project manager and other key personnel associated with specific disciplines shall meet with City staff as needed. The City will schedule these meetings as needed and the content of these meeting will be coordinated through the City. The project manager for this Project will also be available to participate in public workshops and to attend various meetings with affected jurisdictions and agencies as needed.

Bidding Support Phase
The selected design firm will participate as required and directed by the City in bidding of the Project. Responsibilities included, but are not limited to, responding to questions and preparing addenda, if required. Addenda(s) may include preparing supplementary drawings and specifications. The copying and distribution of the Contract Documents during Bidding shall be the responsibility of the City.

Construction Administration
It is the intent of the City to hire the selected design firm to assist with construction administration including, but not limited to:

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 82 of 244 ends

City of Brentwood
Request for Proposals
Page | 11
City Attorney Approved Version 060120
• Preparing and providing a stamped conformed set of issued construction documents with all addenda and plan check comments;
• Participating in weekly field visits and construction meeting; • Reviewing and responding to submittals and RFIs; and
• Providing clarifications of the construction documents, as needed; and participate in the punch-list walkthrough.

Post Construction Services
Post construction services include, but not limited to: preparing and distribution of record drawings, researching and updating the existing Operations and Maintenance (O&M) Manuals or, in the absence of, preparing new O&M Manuals for the Laboratory and assistance with warranty issues.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 83 of 244 ends

City of Brentwood
Request for Proposals
Page | 12
City Attorney Approved Version 060120
Exhibit C – Site Maps
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Request for Proposals

Page 84 of 244 ends

NEW

LABORATORY LABORATORY

ELKINS WAY

IPARQ WAY

REQUEST FOR PROPOSALS

FOR ARCHITECTURAL DESIGN SERVICES FOR THE

WATER AND WASTEWATER LABORATORY PROJECT
CIP PROJECT NO. 592-59207
Document Path: W:\MXD\CIP\Wastewater Treatment Plant Expansion\Cip Location Map New Lab.mxd 1 inch = 300 feet

CITY OF BRENTWOOD

CORPORATION YARD
SUNSET

ATHLETIC

COMPLEX NEW LABORATORY LOCATION
City Corporation Yard

NEW LABORATORY
City Limit

MARSH CREEK
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Exhibit CRequest for Proposals

Page 85 of 244 ends

NEW

LABORATORY LABORATORY

ELKINS WAY
Document Path: W:\MXD\CIP\Wastewater Treatment Plant Expansion\Cip Site Map New Lab.mxd 1 inch = 50 feet

WASTEWATER

TREATMENT
PLANT

NEW LABORATORY SITE

NEW LABORATORY

OPERATIONS

BUILDING

REQUEST FOR PROPOSALS

FOR ARCHITECTURAL DESIGN SERVICES FOR THE

WATER AND WASTEWATER LABORATORY PROJECT
CIP PROJECT NO. 592-59207
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "B" - Exhibit CRequest for Proposals

Page 86 of 244 ends

City Attorney Approved Version 040821 18

AGREEMENT FOR ARCHITECTURAL SERVICES
EXHIBIT “C”

PROPOSAL
Advance Design Consultants, Inc.

City of Brentwood
Water and Wastewater Laboratory Project, CIP No. 592-59207 DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0

Page 87 of 244 ends

998 PARK AVE., SAN JOSE, CA 95126
PRIMARY CONTACT FOR RFP:

LORENZO R. RIOS, PRINCIPAL
[email protected]
408.297.1881

CITY OF BRENTWOOD

ARCHITECTURAL DESIGN SERVICES -

WASTE WATER LABORATORY PROJECT,
RFP FOR CIP PROJECT NO 592-59207 PREPARED FOR
ATTN: ENGINEERING DEPARTMENT
150 CITY PARK WAY
BRENTWOOD, CA 94513
[email protected]
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 88 of 244 ends

Table of Contents | i

TABLE OF CONTENTS
A. COVER LETTER 1
B. GENERAL QUALIFICATIONS 3
C. EXPERIENCE 5
D. STAFFING 8
E. PROPOSED APPROACH 12
F. APPENDIX
ADDENDUM ACKNOWLEDGEMENT 17
RESUMES 24
PRICE PROPOSAL 37
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 89 of 244 ends

A.

COVER LETTER
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 90 of 244 ends

A. Cover Letter | 1
February 9, 2024
City of Brentwood
Engineering Department
150 City Park Way
Brentwood, CA 94513
Subject: RFP for Architectural Design Services
Water and Wastewater Laboratory Project, CIP Project No. 592-59207 Attention: Vatsal Patel; Engineering Department - [email protected] Dear City of Brentwood Engineering Department,
Advance Design Consultants (ADC) is pleased to submit the enclosed information for your consideration in response to the request for proposals for Architectural Design Services for CIP Project No. 592-59207, Water and Wastewater Laboratory Project. Advance Design Consultants, Inc. is a corporation with headquarters in San Jose, CA. Lorenzo R. Rios, Principal will serve as the primary representative for the purposes of this RFP. He has signed this Cover Letter and would be responsible to sign the contract to bind the company should this project be awarded. His contact information is included with his signature.

The Firm. Advance Design Consultants Inc. (ADC) offers a well-established history in working with local municipalities and California Public Works agencies. Our knowledge, experience and procedural understanding allow task orders to be expedited and specific assignments executed. As a group, we take pride in the delivery of sustainable solutions; however, we recognize that a balance of economic, environmental, and reliable designs must stay within City of Brentwood’s budget requirements. With a roster of comprehensive services available, our company will support the City of Brentwood during every stage of the Water and Wastewater Laboratory Project. We strive to conduct efficient, effective job site investigations and implement quality control during the entire design process.

This allows our designs to be extremely accurate and very detailed. Over the decades of service to governmental agencies, we continue to strengthen our team in order to execute and maintain our high level of standards.

Outstanding Performance. As a firm, we have developed a reputation for excellence, aligning our efforts on scope, schedule and budget. ADC has held contracts from design to construction support phases. We have successfully completed projects for federal, state and municipal agencies with essentially the same team and same senior staff proposed for this project. Our experience has taught us that code and governmental agency design guidelines are always the bare minimum of how a space is to be designed. Our design teams must keep in mind that once constructed, these buildings and their design elements have to function optimally and must be easily maintained and operated over a long period of time. To fully understand how a new design will be completed and the space operated after construction, our team of architects and engineers must gather project requirements early in the design process. We must delve into how the City’s Wastewater Operations team will actually use the space. Facilities such as these serve as a consistent reminder and motivation that lead our vision to define, establish and create spaces where our necessary processes can be completed effectively. ADC’s experience with federal, state and local government contracts requires enhanced transparency, budget adherence and timely completion.

Project Delivery Approach and Local Government Experience. Over the last thirty-nine years, the ADC team has completed numerous projects for local Municipalities such as the Cities of San Jose, Sunnyvale, Fremont, Palo Alto, Dublin, Gilroy, Menlo Park, Monterey, Carmel, and Scotts Valley. From our prior experience, we know that the suc998 Park Avenue, San Jose CA 95126 Advance Design Consultants, Inc.

P: 408.297.1881 F: 408.294.3186 Experience. Passion. Excellence.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 91 of 244 ends

2 | Advance Design Consultants, Inc.
cess of any project is to assign highly experienced individuals who understand the project policies and procedures and who have been through the planning, design, and construction phases of projects that can be expected in this Architectural Design contract.

We trust our experience demonstrates how ADC aligns efficiently and effectively with the qualifications required for the completion of the Water and Wastewater Laboratory Project. ADC looks forward to the opportunity to serve the City of Brentwood’s needs.

Lorenzo R. Rios, PE
Principal
Advance Design Consultants, Inc.
[email protected]
P: (408) 297-1881 ext. 238
Advance Design Consultants, Inc.
998 Park Ave.

San Jose, CA 95126
www.adcengineers.com
Phone: 408-297-1881
Fax: 408-294-3186
Federal Tax ID: 77-0046221
998 Park Avenue, San Jose CA 95126 Advance Design Consultants, Inc.

P: 408.297.1881 F: 408.294.3186 Experience. Passion. Excellence.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 92 of 244 ends

B.

GENERAL QUALIFICATIONS
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 93 of 244 ends

B. Background Information | 3

GENERAL QUALIFICATIONS
Established in 1984, Advance Design Consultants, Inc. (ADC) is an integrated team of architects, engineers, designers, planners, consultants and technical specialists offering a wide range of professional services. ADC has extensive experience in providing Architecture and MEP Engineering Services for local municipalities and government entities similar to the City of Brentwood. In addition to various single-project contracts, ADC currently has IDIQ, MTA or On-Call Retainer contracts to provide Architectural and/or Engineering services with the City of San Jose, City of Sunnyvale, City of Menlo Park, City of Monterey, City of Alameda, City of Fremont, City of Marina, City of San Bruno, City of Scotts Valley, County of San Mateo, City of Carmel-by-the-Sea, City of Union City, City of Vallejo, as well as and Judicial Council of CA, CalVet, and CA Military Department. Projects under these contracts include community centers, administrative facilities, public buildings, health care facilities, pump stations, county jails, data centers, City systems, transportation facilities, parking structures, and miscellaneous public spaces. The firm also has extensive experience in both laboratory and office design for federal government and commerical clients.

ADC’s in-house disciplines include; Architecture, Mechanical Engineering, Electrical Engineering, Plumbing Engineering, Process Engineering and Control Engineering. In order to strengthen our core team of disciplines, ADC has developed long-lasting relationships with subconsultants that we work with on a project-by-project basis. ADC typically hold 95% of its contracts as the prime contractor.

ADC is confident it can serve as Prime on this project and provide all Architectural and MEP Engineering services that may fall under this agreement in-house.

Firm: Advance Design Consultants, Inc. (ADC)
998 Park Avenue
San Jose, CA 95126
(o) 408-297-1881
adcengineers.com
Year Established: 1984
Type of Organization: Corporation
Point of Contact: Lorenzo R. Rios, PE
Principal
998 Park Avenue San Jose, CA 95126
[email protected]
Phone: (408)297-1881
Fax: (408) 294-3186
Current Employees: 29
Business Size Determination: Small Business Enterprise (SBE) DUNS number: 13-163-1947
Financial Resources:

Advance Design Consultants has been in business for 39 years which directly reflects its financial stability.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 94 of 244 ends

4 | Advance Design Consultants, Inc.

Description of the Scope of Services usually provided:

Advance Design Consultants, Inc. has a comprehensive list of service opportunities to cover the Water and Wastewater Laboratory Project’s engineering, consulting, planning and construction needs. ADC offers full service engineering, from analysis through implementation with experienced professional mechanical, electrical, process piping, and plumbing engineers. Additionally, we have an in-house team of architects that work alongside our engineers to develop comprehensive building designs that are coordinated across all disciplines and of the highest constructibility. Feasibility studies, facility conditions assessments, building programming and planning, sustainable building design and consulting are some of the addtional available services offered by ADC that will fulfill your architectural and engineering design needs.

Our Architects are experienced in all aspects of building and infrastructure systems designs including:

Architectural Design, Architectural Planning, ADA/California Building Code Accessibility Standards, Building Design, Exterior Design, Energy Strategy, Facilities Management, Interior Design, Lean Architecture, Programming, Cost Estimating & Life-Cycle Costing, and Sustainable Infrastructure.

Our Mechanical Engineers are experienced in all aspects of building and infrastructure systems designs including:

Commercial/Industrial Central Plant Heating and Cooling Systems, Boiler Design, Chiller Design, Cooling Tower Design, Pumping Systems, Heating Water, Chilled Water, and Condenser, Water Piping Systems, Glycol Feed Systems, Office VAV Systems, Constant Volume Systems, Heat Pump Systems, Temperature Control Systems, Geothermal Systems, Radiant In-Floor Heating Systems, Lab Exhaust Fan Systems, ISO Certified Clean Room Systems, Exhaust Systems for Industrial Applications, Air Scrubber Systems, Existing System Renovations and Remodels.

Our Electrical Engineers are experienced in all aspects of building infrastructure systems designs including: commercial/industrial Power Distribution systems, Diesel Generators and UPS, Alternate Energy Systems, Critical Facilities, Interior/Exterior Lighting, Lighting Control Systems, Sub-Stations with Controls, Complete Building Automation design/retrofits, Fire Monitoring, Alarm/Smoke, Venting Systems, Short Circuit Analysis, Office Core and Shell Design, Computer Room USP Design and Specification, Emergency Power Generation, Retail Big Box Design, Site Photometric Analysis, Generator Design and Specification and Cogeneration Plants. In addition, ADC provides electrical system studies and engineering design for modifications to electrical Power, Control, Signaling and Communication Systems.

Our Plumbing Engineers are experienced in all aspects of building and infrastructure systems designs including:

Commercial Waste and Vent Systems, Commercial Domestic Water and Hot Water Systems, Central Domestic Water Heating Plant Design, Commercial Plumbing Systems Design, Storm Water Systems, Storm Water Per-Treatment Systems, Commercial Plumbing Systems Design, Grease Waste Systems, Sump Pump Sewage Ejector/Lift Station Design, Medical Gas Systems for Hospitals and Clinics, Veterinarian Clinic Plumbing, Medical Gas Systems, Vacuum Systems, Deionized Water Systems, Propane Gas Piping, High Purity Gas Systems, High Pressure Process Piping Systems, Toxic and Flammable Leaker Storage Facilities, IPA Storage and Distribution Systems, Diesel Tank and Piping Systems (2nd Containment), Liquid Nitrogen Storage, Evaporator and Distribution Inert Gasses (Argon, Helium, Nitrogen), Waste Water Collection, Heavy Metal, Solvent. ADC also offers, Sanitary and Drain Water Systems, RO Water and DI Water Systems, Piping Expansion, Flexibility and Stress Analysis, Natural Gas Piping Systems Compressed Air Equipment and Piping Design Acid Neutralizing Pre-treatment Systems, Correctional facilities plumbing design.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 95 of 244 ends

C.

EXPERIENCE
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 96 of 244 ends

C. Experience | 5

EXPERIENCE
As discussed in our General Qualifications section, ADC has extensive experience in providing Architecture and MEP Engineering Services for local municipalities and government entities similar to the City of Brentwood. The projects below showcase our experience with the design and construction of new public buildings in existing operating sites with public access. The first two projects show work for municipal entities for projects that include Architectural and Engineering services similar to those that would be necessary for the Water and Wastewater Laboratory Project. The third project showcases the design and construction supervision of a new building, for a federal government agency, in which the project is local. Additionally, the first three projects include reference information. The fourth project is for a confidential federal public agency and highlights our experience with designing office and laboratory space with very specific and precise requirements. All projects included in this section had services performed locally, within the last five years. Our ability to successfully deliver these projects, demonstrates our ability to serve the needs of the City of Brentwood on the Water and Wastewater Laboratory Project including the new building construction.

City of San Jose - Camden Community Center Shelter
Services: AMEPS Address: 3369 Union Ave, San Jose, CA 95124. Performance: 2022-2023 Contract Amount: $299,540 Contact: Rosa Kim (408) 535-5689 ; [email protected] The project consists of various improvements to architectural, mechanical/plumbing, electrical and structural systems in order to facilitate use of Camden Community Center as a temporary shelter site. The project included proving new TPO roofing and insulation for Building C (Classroom/Offices), Building D (Activity Center), and Building E (Gymnasium). This included replacing all existing wood conduit supports with UV resistant, dura-block rooftop supports and investigating and replacing any needed rooftop cables/wires/conduits. Additionally, ADC designed for accessibility updates to make the site ADC and code compliant along each of the routes from the site to the designated shelter area (Gymnasium). The project also included reconfiguring the kitchen layout for Emergency Shelter operations and designing all mechanical, electrical and plumbing work for the existing, relocated and new kitchen equipment and appliances. ADC provided all architectural and MEP design for adding one (1) commercial washer and one (1) commercial dryer, two (2) HVAC systems, as well ensuring connection ready portable backup power system and DOC Power and data. The structural scope included structural seismic strengthening for additional rooftop HVAC equipment as well as assessing structure of Buildings C, D & E and identifying any weak points to be addressed through voluntary structural upgrades.

This project experience is relevant to the required services, because it is a City project which demonstrates the firm’s experience in changing the existing building’s occupancy while maintaining the building as CODE compliant, as will be required for the conversion of the existing lab space to office occupancy.

City of Dublin - HVAC & Roof Replacement
Services: Design Build - MEP, Controls Address: 100 Civic Plaza, Dublin, CA Performance: 2020-2023 Contract Amount: $101,040 Contact: Michael Boinott (925) 833-6630 ; [email protected] ADC and sister-company, ADC Construction Management, were hired by the City of Dublin for a design-build project for the replacement of the roof and HVAC system at City Hall Building. The two-story City Hall building is approximately 32,000 square feet. The roof area is approximately 16,000 square feet. The existing HVAC system, which consisted of three (3) 28-ton roof top multi-zone units, one (1) 25-ton multi-zone unit, two (2) 20-ton multizone units, and one (1) 10-ton gas/electric, had reached its design life. It. Additionally, the system had some zones DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 97 of 244 ends

6 | Advance Design Consultants, Inc.
that never performed adequately, so the scope included performing “pre-balance of the existing air distribution system, to assess and evaluate the existing zoning deficiencies and determine the required adjustments/upgrades to existing ductwork, VAVs, thermostat location adjustments, re-zoning, additional split-system for data closet, etc.

The work also included a new Fire Alarm System, EMS system for the City Hall building HVAC, replacement of all exhaust fans, and installation of approximately 200 Cat6e data drops.

The structural scope included modifications of roof framing to accommodate new HVAC units.

The project included replacing the existing roof on the City Hall building. The existing roof was a sprayed-on foam type roof. The new design was for a roof is a white TPO roofing system, consisting of a fully adhered feltback TPO (thermoplastic polyolefin) single-ply roofing membrane roof, with Energy Star certified “cool roof” white coating, minimum Solar Reflectance Index (SRI) of 0.78, by Henry or Tremco, over 2” polyiso rigid insulation, over (E) 5/8” glass mat faced gypsum roof sheathing. Replacement of the parapet wall coverings within the roof well were included with TPO system.

Additionally, the design including providing walk pads from roof hatch to HVAC units, exhaust fans and other roof mounted serviceable equipment. Removal and replacement of portion of suspended ceilings, patch and painting of interior walls and ceilings accessed to install new work or removal of existing improvements were all included in the project scope.

This experience is relevant to the required services because it includes design and construction of a municipal building that is operational during construction. This project shows ADC’s ability to design and supervise construction to minimize building operations interruptions.

VAMC Martinez - Design and Construct Psychosocial Rehabilitation and Recovery Center (PRRC) Services: AMEPSC Address: 150 Muir Road, Martinez, CA 94553 Performance: 2016-2022 Contract Amount: $1,234,000 Contact: Lye Saechao, PE (916) 366-5403; [email protected] The intent of this project was to conceptualize, design, and provide design support for the construction of a new two-story, 11,180 square feet building for Psychosocial Rehabilitation and Recovery Center (PRRC) for the Veterans Administration Social Health (VASH). This engineering, contracting and support infrastructure project also included demolishing building AB-4, A 2,150 square foot temporary structure, and replacing it with 10 parking spaces. The design of this building must meet LEED requirements for Silver Certification, as required by the USGBC.

ADC provided all required documentation, submitted required applications and fees, and performed necessary coordination to obtain LEED Silver Certification for this building.

ADC provided all required documentation and paid all fees for the SMUD Design ADC provided a California-certified QSD who was responsible for developing, submitting, and paying all associated fees for SWPP and permit. ADC provided an interior design to work with the VA end users to establish a furniture plan, also providing furniture drawing and an excel sheet of items by model and quantity. ADC successfully designed a project that adhered to the construction budget and the business case. ADC provided a checklist of all submittals, certifications, tests and inspections required during construction inspections.

This project is relevant to the required services because it shows ADC’s experience in the design and construction supervision of a new building including, building materials, site features and interior distribution. It is a governmental (federal) job.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 98 of 244 ends

C. Experience | 7
Confidential Client - Laboratory and Office Renovation
Services: AMEPS Address: Livermore, CA Performance: 2021-2022 Contract Amount: $534,533 Contact: Confidential
Advance Design Consultants, Inc. was hired by the client to remodel existing non laboratory space within a building to create a new radiological laboratory capable of handling wet and dry, and chemical laboratory hoods. The remodel required demolition and construction of new walls, doors, HVAC, electrical distribution, and mechanical utilities to support new laboratory functional requirements. The project included modification of mechanical and electrical utilities to meet program requirements including removal of existing unused utilities to the greatest extent.

Architectural features included building accessibility, wall and doors configuration, roofing, and room finishes in addition to accessories such as signage, fire extinguishers, and marketboard. Architect prepared existing condition drawings that were used for the identification of the existing work that was removed for the development of the project. Architect conformed the designs to the codes, regulations, and standards. The Architectural design included new fire rated doors, security doors and security locks.

HVAC included the complete replacement of the existing HVAC equipment non-laboratory space with new HVAC equipment suitable for wet and dry radiological and chemical laboratory space including design of semi-custom roof top air handling units and fan coil fed by the existing chilled water and heating hot water system. The existing central plant was used to supply heating and cooling for the project. Size air handling and exhaust systems with 15% reserve capacity. The design of specialized fume exhaust system including HEPA filtration for customerfurnished laboratory fume hoods, gloveboxes and vacuum furnaces. During the BOD phase, the mechanical engineer prepared heating and cooling load calculations for the project area and Coordinate with the client for verification of central plant capacity. Mechanical engineer completed the load calculations and Central Plant capacity verification before progressing the project into design development.

ADC designed DDC Controls including modifications of the existing system and replaced the system in the building to ensure that the new equipment will be controlled and monitored by the site wide Automated Logic Corporation (ALC) controls system and connected to the building existing ALC control system.

Plumbing system design included the design of the new restrooms and upgrades to existing work as required to provide clean and sanitary facilities for the building occupants while reducing water usage.

The electrical engineer performed field investigations and reviewed drawings to determine the removing of unused electrical equipment & devices back to next active devices to remain in service or source as needed.

Engineer visited the existing facilities for collecting technical electrical information on the existing equipment and proposed laboratory equipment that was installed in this project.

This project experience is relevant to the required services because it shows ADC experience and capability to design laboratories despite of any complexity. Also, the project includes the conversion of existing building space to ADA compliant offices. ADC is experienced and capable of designing the proposed lab spaces and office conversion. It is a governmental (federal) job.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 99 of 244 ends

D.

STAFFING
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 100 of 244 ends

D. Staffing | 8

STAFFING
Advance Design Consultants, Inc. (ADC) offers the City of Brentwood a team of architects, engineers, and designers that encompass all the disciplines required for the Water and Wastewater Laboratory Project. The proposed team has extensive experience in Architectural and Engineering designs for California municipalities and public agencies.

Recognizing that projects are dynamic and require a myriad of disciplines and services providing support to be successful, Advance Design Consultants, Inc. offers complete architectural evaluation and design services in addition to full-service engineering, from analysis through implementation with professional mechanical, electrical, process piping, and plumbing engineers. Our architects work alongside our engineers to develop comprehensive building designs that are coordinated across all disciplines and of the highest constructability.

PRIME
Advance Design Consultants, Inc - Architectural, Mechanical Engineering, Electrical Engineering and Plumbing Engineering
ADC offers the following key personnel:

EXECUTIVE TEAM
Our Executive Team are experienced licensed engineering professionals who have lead engineering and design teams for decades. They are experts in their fields and each bring a unique perspective to our firm to provide clients with a well-rounded and diverse base of knowledge. • Lorenzo A. Rios, MS, PE, registered electrical and mechanical engineer, and licensed contractor in the State of California, is the Founding Principal and will serve in an advisory and oversight role for the firm. Mr. Rios has over 45 years of multi-disciplinary engineering experience overseeing, managing, and participating in every part of the design process and construction proccess. His experience includes working extensively with HVAC systems, process piping, fire protection, plumbing, power distribution, motor control centers, generators, boiler installation and replacement, tool installations, and programmable logic control. Mr. Rios is extremely knowledgeable in the preparation of project budgets and design for similar project to this contract. • Lorenzo R. Rios, PE, registered mechanical engineer in the State of California, Principal and Project Executive will ensure the quality of the services provided by the firm. His 20 years of experience include a wide range of technical and communication skills which can be applied to an assortment of industries. His primary focus has been in the semi-conductor clean room industry and commercial/industrial building improvements.

His expertise is the engineering design complex facilities in which hazardous products are used in product development along with complex manufacturing tools and equipment. As a Thermal Fluids focus in mechanical engineering, Lorenzo has an extensive knowledge of complex mechanical systems which he applies to all projects he manages. His experience is multi-disciplinary and he is well versed in the electrical engineering, structural engineering and building design standards as well. As Project Executive, Lorenzo will ensure will ensure that the project is well staffed to deliver a quality product within the time and budget established.

PROJECT MANAGEMENT
Our Project Management Team consists of experienced professionals who consistentenly lead engineering and design teams for governmental and corporate clients. Dina Aljuburi, MBA LEED AP has been assigned to serve as Project Manager for the Water and Wastewater Laboratory Project. She will respond to the City of Brentwood’s DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 101 of 244 ends

9 | Advance Design Consultants, Inc.
requests to ensure a timely response. She will also be responsible lead the project team to ensure the completion of each task. Additionally, she will have support from our Project Coordinator and other support staff. • Dina Aljuburi, MBA, LEED AP, Senior Project Manager is Mechanical Engineer and LEED-AP certified professional. She has 24 years of experience in HVAC design, project management, energy analysis and AutoCAD drafting field for commercial and institutional projects. Her specialized experience and LEED-AP credentials help her effectively lead highly sensitive projects for Lockheed Martin and other governmental and high tech clients.
• Kenna Lumos, Project Coodinator, will be assigned to maintain clear and timely communications in the project from beginning to end. She will coordinate collaboration, complete meeting minutes, and assist with scheduling of meetings, both internal and external. Ms. Lumos is an expert in Procore, MS Suite programs, and other specification and scheduling programs that have been very useful in Public Works projects.

ARCHITECTURE
Our Architects are experienced in all aspects of building and infrastructure systems designs and are well equipped to design the Architectural components of the Water and Wastewater Laboratory Project. • Eman Bermani AIA, NCARB, LEED AP, Architect, will serve as Sr. Architect for this project. Ms. Bermani is Certified Architect in California with 38 years of architectural experience. Ms. Bermani brings her extensive Architectural knowledge to all of her projects. She not only leads our Architectural team, but is responsible for the design of architectural elements including ADA, interior design, space planning and ingress and regress paths. She has ample experience in District State Architect (DSA) processes and procedures and brings this expertise to all of her projects.
• Roland Lazzarotto, AIA, LEED, ISPE, Architect, will serve as Laboratory Liaison for this project. Mr. Lazzarotto is a has over fifty years of experience in all facets of wet and dry labs, office, industrial, microelectronics and biotech architectural projects. He specializes in complex projects that require special attention due to complex program, multi-party clients, aggressive schedule, large size or existing conditions requiring special accommodations. He will ensure that ADC’s design for the new laboratory building is compliant with all City’s needs and work as a liason between the City’s laboratory design personnel and ADC’s Project Manager/Sr.

Architect.
• Jose Aguirre, Senior Architect Designer, will support the Architect under this contract. Mr. Aguirre has his Bachelor’s degree in Architecture from Architecture Instituto Tecnologico de Mexico. He brings over 12 years of experience in ADA, interior design, space planning, feasibility studies, building code research, ingress and regress paths.
• Roger Sotelo, Sr. REVIT Designer, will provide REVIT/CAD design/drafting services.

MECHANICAL ENGINEERING
Our Mechanical Engineers are experienced in all aspects of building infrastructure systems designs and and have previously designed for office spaces and laboratory projects. • Gewargis Youssefi, PE, LEED AP BD+C, registered mechanical engineer in the State of California will perform mechanical engineering services for the HVAC and Plumbing systems. • Michael Zell, Mechanical Engineer I, provides additional support for Sr. Mechanical Engineers with design and drafting for HVAC systems, boiler and chiller design, exhaust fan systems, and related field work and calculations.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 102 of 244 ends

D. Staffing | 10

ELECTRICAL ENGINEERING
Our Electrical Engineers are experienced in all aspects of building infrastructure systems designs and have previously all relevant electrical design components needed for this project. • Alex Hernandez, PE, registered electrical engineer in the State of California will perform infrastructure electrical analysis including electrical supply and distribution on site and inside buildings and structures, lighting design, fire alarm, security and communication systems. • Fernando Sepulveda, Electrical Engineer II, performs design and engineering for electrical power supply and distribution on site and inside buildings and structures, lighting design, fire alarm, security and communication systems.
• Mario Cuellar, Senior Electrical Designer/BIM, performs design and engineering for electrical power supply and distribution.

PLUMBING ENGINEERING
Our Plumbing & Process Piping Engineers are experienced in all aspects of building and infrastructure systems designs and have designed for a wide variety of public works and municipal projects. • David Hammond, PE, registered mechanical engineer in the State of California will perform infrastructure analysis and site engineering including utility coordination, water supply and distribution, storm drainage, and waste water from buildings and structures.
• Xiuqing (Jean) Jin, MS, PE, LEED AP BD+C, registered mechanical engineer in the State of California will provide additional plumbing/process piping engineering support.

SUBCONSULTANTS
ADC has developed and maintained strategic partnerships with sub consultants such as architectural, structural, civil, fire protection and geotechnical engineers, code/permitting consultants, environmental specialists, and specific technical experts who further expand our outreach and provide resources and insight to ADC’s already multi-disciplined and experienced team. We work with these consultants on the design of new buildings and building renovations. Between ADC’s in-house personnel and network of sub consultants, we are fully able to provide any civil, structural, geotechical, and landscape architecture work or other disciplines that become needed as part of this contract. All sub consultants work directly with the Project Manager who ensures the quality and timeliness of all work. Our partners are organizations that share our purpose and passion, teaming with ADC to drive innovation and sustainability through every aspect of a project to exceed client expectations and industry standards.

ADC proposes the following Sub-Consultants for this project. ADC has long-standing relationships with each of these firms and has active projects with them at any given time.

STRUCTURAL ENGINEERING - MORRIS SHAFFER ENGINEERING
Website: https://morris-shaffer.com/
Contact: Geoff Clifford, SE, CE - Structural Principcal License: 3662 - Structural Engineer; 40608 - Civil Engineer Address: 1300 Industrial Road, Suite 14, San Carlos, CA 94070 Phone: (650) 595-2973 DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 103 of 244 ends

11 | Advance Design Consultants, Inc.

CIVIL ENGINEERING - MISSION ENGINEERS
Website: https://missionengineersinc.com/
Contact: Daniel Nunes, PE, Civil Principal License: 76449 - Civil Engineer; 9212 - Land Surveyor Address: 2355 De La Cruz Blvd., Santa Clara, CA 95050 Phone: (408) 727-8262

BAGG ENGINEERS - GEOTECHNICAL ENGINEERING
Website: https://www.baggengineers.com/
Contact: Jason Van Zwol - Chief Geotechnical License: 854 - Geotechnical Engineer; 33662 - Civil Engineer Address: 138 Charcot Avenue, San Jose, CA 95131 Phone: (650) 852-9133

LANDSCAPE ARCHITECTURE - MERRIL MORRIS PARTNERS
Website: https://merrill-morris.com/
Contact: John Potis, RLA - Sr. Associate Landscape Architect License: 4790 - Registered Landscape Architect SF Office Address: 249 Front Street, San Francisco, CA 94111 Phone: (650) 595-2973 Oakland Office Address: 155 Fibert Street, Suite 240/250, Oakland, CA 94607 Phone: (510) 277-3400 DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 104 of 244 ends

E.

PROPOSED APPROACH
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 105 of 244 ends

F. Proposed Approach | 12

PROPOSED APPROACH
The Water and Wastewater Laboratory Project (“Project”) is a Capital Improvement Program project that includes the construction of a new building that will house the laboratory and the remodeling the existing laboratory space for the water and wastewater systems on the City’s Wastewater Operations Administrative Building (“Admin Building”) site located at 2251 Elkins Way, Brentwood.

The new laboratory building will be approximately 2,500 to 3,000 square feet to provide adequate laboratory space for future build-out conditions within the City’s Municipal Services Corporation Yard. The new laboratory space will be located behind the existing Admin Building. A new breezeway will connect the existing laboratory space to the new laboratory.

The design services include the following items:

Architectural:

1. ADC will provide design services for the construction of a new single-story Laboratory of approximately 2,500 to 3,000 square feet within the City of Brentwood Municipal Services Corporation Yard. ADC will prepare a basis-of-design report for the new building construction including proposed building type, occupancy, and alternative materials of construction that will fit best the project requirements.

2. ADC will prepare a minimum of three (3) building layouts that will fit the new laboratory requirements established by the City. The new lab layout and basic design will include spaces for City of Brentwood staff, sampling, and testing, work areas for equipment, and storage. The three layouts will be presented and reviewed by the city representatives. The proposed lab layouts will be presented to the city during the programming stage of design. The construction design document will comply with the Americans with Disabilities Act.

3. The proposed Laboratory space will include card readers and security similar to the rest of the Municipal Services Center.

4. The new lab will be provided with new equipment. The city is responsible for providing equipment specifications and cut sheets.

5. ADC will provide design services for a new breezeway connection to the existing laboratory space from the new Laboratory. ADC will ensure that the new pathway will be ADA-compliant.

6. ADC will provide design services for site improvement to ensure that existing parking and the new lab location can accommodate access for deliveries and turnaround.

7. ADC will provide design services for the existing Laboratory and Administration Building. The expanded Architectural and Engineering design will include the following:
a. Remodeling the existing laboratory open space area and portions of the Lab Storage Room into a new workspace with workstations for approximately seven (7) staff. b. Converting the existing Bio Assay Room and a portion of the BOD Microbiology Room into a new Storage Room.
c. Expanding the existing Locker Room through the BOD Microbiology Room and portions of the Bio Assay Room.
d. Converting the existing Lab Storage into the Mechanic’s Office. e. Converting the existing Lab Office into the Collections Office.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 106 of 244 ends

13 | Advance Design Consultants, Inc.
f. Expanding the existing Lunchroom and adjacent Office into a new multi-Purpose Room for a capacity of 20 or more; and Replacing the existing entry mats at the main entry and plant entry. The proposed improvements to the Conference Room and Multi-purpose Room will require modification and/or relocation of T-bar ceilings, air outlets, electrical outlets, light fixtures, and finishes. g. Replace the existing linoleum flooring throughout the Admin Building except for the Group Office. h. Incorporate the same finishes for the new office area as the rest of the Admin Building. i. Repair the existing T-bar ceiling as part of the existing lab improvement.

Civil:

1. The ADC team will prepare a Geotechnical engineering report presenting the results of field investigation, summarizing of findings and recommendations including laboratory testing program on the collected soil samples. The Geotech report will include a vicinity map, a site plan showing the approximate boring/CPT locations, an area geologic map, a regional fault map, the boring and CPT logs, and the laboratory test results.

2. ADC will provide services for civil engineering design, including all underground utilities, grading, earthwork, calculations, erosion control, and paving. Civil design will also evaluate the most appropriate means for compliance with general permit for Storm Water Discharges Associated with Industrial Activities.

3. ADC’s team will provide topographic surveys needed to study and design this project, 20-scale with 1-ft contours. This includes topographic maps, control surveys (horizontal and vertical, vertical datum set to NAVD88); elevations, and new monuments needed. The topographic map will present existing and new utilities within the area of the scope of work.

4. ADC will prepare construction staking calculations, set offset stakes, and provide staking diagrams.

Structural:

1. ADC will provide structural design services for the new Laboratory Building which will include the design of a new structural system, building foundation, and framing.

2. The ADC team will review the soils report and other engineering documents pertaining to the site and the existing administration building. Additionally, ADC will review Architectural schematic design drawings.

3. ADC will prepare preliminary building plan sheets showing foundations, column locations, framing layouts, and location of vertical shear elements. ADC will provide structural design services for the new breezeway connection to the new Laboratory.

4. ADC will provide equipment anchorage support and concrete pads for the new HVAC system serving the Laboratory building.

Mechanical:

1. ADC will provide a new mechanical system for the new building. The proposed HVAC system would consist of either a VRF system or a split system with a heating and cooling option. The new Lab building design DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 107 of 244 ends

F. Proposed Approach | 14
will include mechanical closet/ closets to house the new indoor units and a mechanical services yard for the outdoor units.

2. ADC will provide a mechanical ventilation system for the new lab. The basis-of-design and ventilation requirements will be coordinated during the design phase.

3. ADC will provide load calculation for the new Workspace and the new Multipurpose Room to ensure that the existing HVAC system has sufficient capacity to serve the new scope of work. Additionally, ADC will relocate, and adjust existing air devices and ductwork system as necessary.

4. The project does not include a new dedicated mechanical system to serve the new Workspace and the new Multipurpose Room.

5. ADC will provide T-24 energy calculation for the new mechanical system serving the new laboratory.

Electrical:

1. ADC will provide power service to the new laboratory building. This includes, but is not limited to, electrical services to the lab equipment and HVAC system, new outlets, and new electrical panels.

2. The project assumes that the source power at the existing site is adequate to serve the new scope of work including the new Laboratory. The project excludes upgrades to the existing electrical services including coordination with PG&E. ADC will verify existing services, provide load calculation, and update the single-line diagrams in addition to panel schedules.

3. ADC will install load reading equipment over 30 calendar days at the main distribution switchgear. The project assumes that the existing electrical substation, switchboards, and panels have enough capacity to serve the proposed equipment.

4. ADC will adjust existing electrical outlets to serve the new scope of work at the new Workspace and the new Multipurpose Room. Typical for existing light fixtures.

5. ADC will provide design services for new light fixtures and security devices serving the surrounding area of the new Laboratory.

Plumbing:

1. ADC will provide plumbing design services for a new building including restrooms and laboratory equipment.

This includes, but is not limited to, sanitary sewers, condensate, and domestic water supply.

2. ADC will provide new plumbing fixtures for the new Workspace and the new Multipurpose Room.

Landscaping:

1. ADC will provide landscape architectural design for the new Laboratory surrounding area. Layout, design concept, and plant selection with be coordinated with the City of Brentwood representatives.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 108 of 244 ends

15 | Advance Design Consultants, Inc.

Assumptions and Exclusions:

1. The project excludes the preparation of construction drawings for fire sprinklers, fire alarm and/or life safety systems. Schematic documents will be provided to a licensed contractor for shop drawings and permit drawings preparation.

2. No audio/visual will be included in the proposed Multipurpose Room.

3. The City will be retaining RBI to assist with preparing all necessary reports and obtaining permits from various agencies such as, Air Resources Board for Authority to Construct and Operate and the Regional Water Quality Control Board for Construction Stormwater Permits as part of this Project.

4. The project excludes electric vehicle charging station design.

5. The design standards will be consistent with applicable Building Codes, City Standards, authorities having jurisdiction, etc.

6. The project excludes coordination with the gas company/ PG&E. A New gas meter is excluded from the project scope of work.

7. The project excludes new light fixtures for the new Workspace and the new Multipurpose Room.

8. The project excludes ARC flash study of the existing switchgear.

9. The project assumes that there will be only one (1) design package for the whole project and that there will be only one (1) document/construction phase.

10. All permit fees are excluded and the client will pay for permit fees at the City to obtain the permits. City of Brentwood also elects to have ADC pay for permit fees and then request a direct re-imbursement with zero mark-up as a Change Order.

11. The project assumes cost reduction or value engineering requiring redesign after approved systems have been designed at the 60% submittal is excluded.

12. The project assumes that the existing electrical substation, switchboards, and panels have enough capacity to serve the proposed equipment.

13. The project excludes any structural upgrades to the existing administration building frame, foundation, or roof.

14. Outdoor equipment cover if any such as a canopy, or roof is excluded from this proposal’s scope of work.

15. LEED requirements are not part of this project’s scope of work.

16. It is assumed that the City of Brentwood will provide as-built drawings for the Administration Building including up-to-date single line diagrams and panel schedules.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 109 of 244 ends

F. Proposed Approach | 16
Engineering Deliverables

1. Integrated CPM Schedule to meet the completed design needs date specified in the RFP.

2. Provide Architectural services to develop a Preliminary/ Programming Design Report.

3. Provide A-E services to develop 30% Schematic Design (SD) documents per SOW identified in section A.

4. Provide A-E services to develop 60% Design Development (DD) documents per SOW identified in section A.

5. Provide A-E services to develop 90% of Construction Documents (CD) documents per SOW identified in section A. Reference Lockheed specifications and standard details needed.

6. Provide A-E services to develop 100% of Construction Documents (CD) documents per SOW identified in section A.

7. Provide Rough-Order-Magnitude (ROM) Cost estimates at 30% SD, 60% DD, 90% CD and 100% CD design phases.

8. Provide project draft technical specifications at 90% CD design phase and final specifications at 100% CD.

9. Provide Post Construction and Construction Administration services for the completed design. Construction duration will not exceed sixteen (16) months.

Construction Administration Deliverables and Services include the following:
a. Responses to RFI’s.
b. Submittal Reviews including shop drawings.
c. Bulletin drawing updates for any design changes/updates during construction d. As-Built drawings at the end of construction.
e. List of Long lead assets with estimated lead-times.
f. Attend final punch walk and prepare punch walk lists. g. Assist the City of Brentwood Building Division’s Building Permit process.

DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 110 of 244 ends

F.

APPENDIX
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 111 of 244 ends

Appendix - Signed Addendums | 17

ENGINEERING DEPARTMENT
150 City Park Way, Brentwood, CA 94513
Phone 925.516.5420 FAX 925.516.5421
[email protected]
January 16, 2024
ADDENDUM NO. 1
Water and Wastewater Laboratory Project
CIP Project No. 592-59207
NOTICE TO PROPOSERS:

The following clarifications, amendments, additions and/or deletions as set forth herein shall apply to the above documents and shall be made a part thereof and shall be subject to all the requirements thereof as though originally specified and/or shown. Submitters shall assure themselves that all addendum changes have been incorporated into their proposal.

A. AMENDMENTS

1. The mandatory Pre-submittal Meeting time has been changed to 11:00 a.m. on January 23, 2024. Changes are to be reflected throughout RFP.

2. Include the following additions:
a. Cover Letter: 2nd paragraph add after (“Admin Building”) “as well as design services for remodeling the existing laboratory space to accommodate build-out…” b. Request for Proposals under THE PROJECT add to A. Summary after (“Admin Building”) “as well as design services for remodeling the existing laboratory space to accommodate future build-out…”
c. Exhibit B – Scope of Services add the following sentence to the end of paragraph 3: “Design services also include remodeling the existing laboratory space to accommodate future build-out.”
All bidders shall acknowledge receipt and acceptance of Addendum No. 1 by signing below and including it in the RFP.
-END OF ADDENDUM NO. -1-
Vatsal Patel, P.E.

Engineering Manager
Acknowledgment of Receipt and Acceptance: __________________________________ DocuSign Envelope ID: B9B09FA3-1A5E-4A55-A47C-CA0EE8B000EE 1/30/2024
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 112 of 244 ends

18 | Advance Design Consultants, Inc.

ENGINEERING DEPARTMENT
150 City Park Way, Brentwood, CA 94513
Phone 925.516.5420 FAX 925.516.5421
[email protected]
January 29, 2024
ADDENDUM NO. 2
Water and Wastewater Laboratory Project
CIP Project No. 592-59207
NOTICE TO PROPOSERS:

The following clarifications, amendments, additions and/or deletions as set forth herein shall apply to the above documents and shall be made a part thereof and shall be subject to all the requirements thereof as though originally specified and/or shown. Submitters shall assure themselves that all addendum changes have been incorporated into their proposal.

A. GENERAL
The as-built plans for the existing Wastewater Operations Administrative Building (“Admin Building”) will be made accessible to the Consultants via a link provided by the City. Please contact the Engineering Department at [email protected] to request the link.

B. AMENDMENTS

1. The expanded scope of work for the existing Laboratory and Admin Building shall be revised to include the following:
a. Remodeling the existing laboratory open space area and portions of the Lab Storage Room into a new work space with workstations for approximately seven (7) staff;
b. Converting the existing Bio Assay Room and a portion of the BOD Microbiology Room into a new Storage Room;
c. Expanding the existing Locker Room through the BOD Microbiology Room and portions of the Bio Assay Room;
d. Converting the existing Lab Storage into the Mechanic’s Office; e. Converting the existing Lab Office into the Collections Office; f. Expanding the existing Lunch Room and adjacent Office into a new Multi-Purpose Room for a capacity of 20 or more; and
g. Replacing the existing entry mats at the main entry and plant entry.

Please see Exhibit A – Conceptual Layout, herein attached, with a conceptual layout for reference. The selected Consultant can propose alternative layouts to optimize the space based on existing mechanical, electrical, and plumbing configuration.

DocuSign Envelope ID: 1684AAAE-8419-4437-9B67-013166D47BD5 DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 113 of 244 ends

Appendix - Signed Addendums | 19
Water and Wastewater Laboratory Project
CIP Project No. 592-59207
Addendum No. 2
January 29, 2024

ENGINEERING DEPARTMENT
150 City Park Way, Brentwood, CA 94513
Phone 925.516.5420 FAX 925.516.5421
www.brentwoodca.gov

2. The expanded scope of work will also include replacement of the existing linoleum flooring throughout the Admin Building except for the Group Office.

Please see Exhibit B – Flooring Replacement, herein attached.

C. CLARIFICATIONS

1. The intent is that the proposed laboratory shall be approximately 2,500 to 3,000 square feet.

2. There will be a breeze way connected to the existing laboratory space from the new laboratory.

3. The proposed laboratory space shall include card readers and security similar to the rest of the Municipal Services Center.

4. There is no listing of all laboratory equipment. It is expected that all existing laboratory equipment shall be replaced with all new equipment.

5. The existing parking layout and proposed laboratory area shall be reconfigured to accommodate turnaround and access for deliveries.

6. No audio/visual shall be included in the proposed Multi-Purpose Room.

7. The proposed laboratory shall be single-story.

8. No LEED certification is required for the new laboratory.

9. The CEQA consultant for the Wastewater Treatment Plant Expansion - Phase II is Art O’Brien, Robertson-Bryan, Inc. (RBI).

10. The City will be retaining RBI to assist with preparing all necessary reports and obtaining permits from various agencies such as, Air Resources Board for Authority to Construct and Operate and the Regional Water Quality Control Board for Construction Stormwater Permits as part of this Project.

Therefore, Consultants shall remove this scope of services as part of their proposals. The selected Consultant shall provide support to the City and RBI in these processes should it be required.

DocuSign Envelope ID: 1684AAAE-8419-4437-9B67-013166D47BD5 DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 114 of 244 ends

20 | Advance Design Consultants, Inc.

Water and Wastewater Laboratory Project
CIP Project No. 592-59207
Addendum No. 2
January 29, 2024

ENGINEERING DEPARTMENT
150 City Park Way, Brentwood, CA 94513
Phone 925.516.5420 FAX 925.516.5421
www.brentwoodca.gov
All bidders shall acknowledge receipt and acceptance of Addendum No. 2 by signing below and including it in the RFP.
-END OF ADDENDUM NO. -2-
Vatsal Patel, P.E.

Engineering Manager
Acknowledgment of Receipt and Acceptance: __________________________________ DocuSign Envelope ID: 1684AAAE-8419-4437-9B67-013166D47BD5 1/30/2024
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 115 of 244 ends

Appendix - Signed Addendums | 21

ENGINEERING DEPARTMENT
150 City Park Way, Brentwood, CA 94513
Phone 925.516.5420 FAX 925.516.5421
[email protected]
February 2, 2024
ADDENDUM NO. 3
Water and Wastewater Laboratory Project
CIP Project No. 592-59207
NOTICE TO PROPOSERS:

The following clarifications, amendments, additions and/or deletions as set forth herein shall apply to the above documents and shall be made a part thereof and shall be subject to all the requirements thereof as though originally specified and/or shown. Submitters shall assure themselves that all addendum changes have been incorporated into their proposal.

A. CLARIFICATIONS

1. The schedule is driven by the approved budget.

2. Client group time review will mainly be during the Preliminary Design Report and 60% design submittal.

3. The plan review time through the Building Division is dependent on the completeness of submittals and addressing of comments by the Consultant.

4. The Consultant shall be responsible for the building permit process, which includes but is not limited to: preparing and submitting application forms, preparing required submittals and documents; submitting and resubmitting permit applications and documents; preparing and responding to comments from the Building Division as part of the plan check process; meeting with the Building Division as needed to review submittals and comments; and all other tasks required to obtain a building permit for this Project.

5. The City’s CEQA Consultant has been contacted to begin preparing the amendment. The intent is to complete it before the Preliminary Design Report submittal by the Consultant.

6. The Project will need to be phased to maintain the laboratory operations. Therefore, the new laboratory will be constructed and operational before the existing laboratory and remaining Wastewater Operations Administrative Building (“Admin Building”) improvements are completed.

7. Perimeter landscaping for beautification and green infrastructure for stormwater management and discharge control shall be in accordance with the City’s Municipal Code and National Pollutant Discharge Elimination System Permit.

8. The fee proposal can be attached as an appendix to the Proposal.

DocuSign Envelope ID: 20A85E40-1B24-41A9-B78E-A2DF53E4AE20 DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 116 of 244 ends

22 | Advance Design Consultants, Inc.

Water and Wastewater Laboratory Project
CIP Project No. 592-59207
Addendum No. 3
February 2, 2024

ENGINEERING DEPARTMENT
150 City Park Way, Brentwood, CA 94513
Phone 925.516.5420 FAX 925.516.5421
www.brentwoodca.gov

9. The City is open to recommendations and different approaches to the design and construction of the new laboratory. Consultants should provide their approach and options within their Proposal to better understand.

10. The current tests performed by City staff within the laboratory are identified in the Fields of Accreditation, herein attached as Exhibit A.

11. There are no additional tests City staff would like to perform as part of the new laboratory.

12. The Consultant shall not anticipate any increase in functions or equipment planned for the new laboratory.

13. The Consultant shall assist the City in preparing the specifications and submittal requirements for the list of equipment to be used in the new laboratory. The City will assist in providing a list of equipment.

14. The City is currently undergoing an update to the ADA Transition Plan; the existing plan can be made available to the Consultant. However, it is understood that the breeze way or pathway from the new to the existing laboratory and Admin Building will be ADA compliant.

15. The Consultant shall not incorporate any proposed electric vehicle charging stations in this Project.

16. The Consultant shall assist the City during the bidding process, which includes but is not limited to: preparing and responding to requests for information (“RFIs”) during bidding; preparing addenda; revising the plans and specifications to address RFIs; and all other tasks required during bidding.

17. The Consultant should anticipate to assist the City with construction administration for a duration between 14 and 16 months. Please note this is subject to change due to the building permit process, contractor’s schedule, procurement and delivery of materials and equipment, weather, and possible delays due to unforeseen conditions.

18. The Consultant shall plan on using the existing as-built PDFs as there are no as-built drawings available in CAD or Revit.

19. The existing HVAC system will not serve the new laboratory. The Consultant shall plan on proposing a new HVAC system for the new laboratory.

20. The proposed improvements to the Conference and Multi-purpose rooms will require modification and/or relocation of T-bar ceilings, HVAC, electrical, plumbing, outlets, fixtures, finishes, etc.

21. Load reading and historical data is not available for the peak load of the Admin Building at this time. The Consultant can include this as part of their City’s deliverables during the kick-off meeting.

DocuSign Envelope ID: 20A85E40-1B24-41A9-B78E-A2DF53E4AE20 DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 117 of 244 ends

Appendix - Signed Addendums | 23
Water and Wastewater Laboratory Project
CIP Project No. 592-59207
Addendum No. 3
February 2, 2024

ENGINEERING DEPARTMENT
150 City Park Way, Brentwood, CA 94513
Phone 925.516.5420 FAX 925.516.5421
www.brentwoodca.gov

22. The Consultant shall not anticipate a BMS/EMS system for the existing Admin Building as part of this Project.

23. The Consultant shall only anticipate modification and/or repair to the T-bar ceiling as part of the existing laboratory improvements.

24. The Consultant shall incorporate the same finishes for the new office area as the rest of the Admin Building.

25. The design standards shall be consistent with applicable Building Codes, City Standards, authorities having jurisdiction, etc.

26. For title block, sheet settings, size, etc., refer to “Plan Sheet Samples” and “Plan Sheet Templates” located: https://www.brentwoodca.gov/government/engineering/forms and in accordance with the “Engineering Procedures Manual” located:
https://www.brentwoodca.gov/government/engineering/reference-information/-folder306.

27. The Consultant shall provide hard copies and PDFs for all deliverables. As-builts will be submitted in CAD and PDF formats per the City’s “Engineering Procedures Manual.” All bidders shall acknowledge receipt and acceptance of Addendum No. 3 by signing below and including it in the RFP.
-END OF ADDENDUM NO. -3-
Vatsal Patel, P.E.

Engineering Manager
Acknowledgment of Receipt and Acceptance: __________________________________ DocuSign Envelope ID: 20A85E40-1B24-41A9-B78E-A2DF53E4AE20 2/5/2024
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 118 of 244 ends

24 | Advance Design Consultants, Inc.

ORGANIZATIONAL CHART
Lorenzo A. Rios, PE
Founding Principal
Lorenzo R. Rios, PE
Principal & Project Executive
Executives
Michael Zell
Mechanical Engineer
Fernando Sepulveda
Electrical Engineer II, Energy &
Title 24
Mario Cuellar
Senior Electrical Designer/ BIM
Jean Jin, PE
Plumbing Engineer III
Electrical Engineers
Mechanical Engineers Plumbing Engineers
Jose Aguirre
Senior Architectural Designer

REVIT & CAD
Roland Lozzarotto, AIA, LEED
Architect and Laboratory Liaison
Architecture
Eman Bermani, AIA, LEED AP
Senior Architect, Site Access &
Interior Improvements
Gewargis Youssefi, PE LEED AP
Senior Mechanical /
HVAC Engineer
Alex Hernandez, PE
Senior Electrical Engineer
David Hammond, PE
Senior Plumbing, Process Piping,
Automation Controls Engineer
Support Staff
AutoCAD - BIM - REVIT - NavisWorks Support Staff
Specification Writers, Administrative Staff
Key Team Members
Resumes included in proposal
Roger Sotelo
Sr. REVIT Designer
Project Management
Kenna Lumos
Project Coordinator
Dina Aljuburi, MBA, LEED AP
Project Manager
Subconsultants
Geotechnical
BAGG Engineers
Jason Van Zwol, PE, GE
Chief Geotechnical Engineer
Structural Engineering Morris Shaffer Engineering
Geoffery Clifford, PE, SE
Principal Structural Engineer
Civil Engineering Mission Engineers, Inc.

Daniel Nunes, PE
Principal Civil Engineer
Landscape Architecture Merrill Morris Partners
John Potis
Sr. Assoc. Landscape Architect
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 119 of 244 ends

Appendix - Org Chart & Resumes | 25
Mr. Rios is the Founding Principal of Advance Design Consultants, Inc. Lorenzo holds a Master’s of Science in Mechanical Engineering, a Bachelor’s of Science in Electrical Engineering, and has over 40 years of multi-disciplinary engineering experience. Mr. Rios maintains active Mechanical and Electrical Engineering licenses as well as a Class B Contractors License with his company, ADC Construction Management. He has extensive experience overseeing, managing, and participating in every aspect of the design and construction process. His experience includes working extensively with HVAC systems, process piping, fire protection, plumbing, power distribution, motor control centers, boiler installation and replacement, tool installations, and programmable logic control.

SELECTED EXPERIENCE
Veterans Administration Medical Center | PRRC
Martinez, California
Veterans Administration Medical Center | Building 650
1st Floor Renovation
Mathers, California
Veterans Administration Medical Center | Construct
Outpatient Mental Health Services
Mather, California
City of San Jose | Camden Community Center Shelter
San Jose, California
City of San Jose | Fossa Night House
San Jose, California
City of Dublin | HVAC & Roof Replacement
Dublin, California
Confidential Client | Laboratory Renovatio
Livermore, California
Confidential Client | B298 ACU-05 Replacement
Livermore, California
City of Scotts Valley | Generator Install Senior and
Community Center
Scotts Valley, California
City of Scotts Valley | City Hall HVAC Improvement
Scotts Valley, California
City of Menlo Park | Dispatch Radio Room HVAC Upgrades
Menlo Park, California
City of Sunnyvale | Renovations for Internal Affairs at Community Center
Sunnyvale, California
City of Palo Alto | Replace Switchgear and Motor Control Center
Palo Alto, California
California Military Department | Camp Roberts
Camp Roberts, California
Santa Clara County | Main Jail South | Control Room
Upgrades
San Jose, California
EDUCATION | PROFESSIONAL LICENSE
Master of Science, Mechanical Engineering
University of Texas at Austin
Bachelor of Science, Electrical Engineering
University of Texas at Austin
Professional Engineer
California #M21000 - 1980
California #E10342 - 1979
Contractors License
California #750193 - Class B

AFFILIATIONS
American Society of Heating, Referigerating and AirConditioning Engineers Member
International Society for Pharmaceutical Engineering
Member
International Facility Management Association - Silicon Valley
Member
Association for Facilities Engineering
Member
Rotary Club of Santa Clara
Member
Lorenzo A. Rios, PE

FOUNDING PRINCIPAL
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 120 of 244 ends

26 | Advance Design Consultants, Inc.

Lorenzo R. Rios, PE

PRINCIPAL / PROJECT EXECUTIVE
Lorenzo R. Rios is Principal at Advanced Design Consultants, Inc., and as such he serves as a Project Executive is managing several architectural/engineering design projects for many of the company’s clients. His 20+ years of experience include a wide range of technical and communication skills which can be applied to an assortment of industries. His primary focus has been in the semi-conductor cleanroom industry and commercial/industrial building improvements. His expertise is the engineering design complex facilities in which hazardous products are used in product development along with complex manufacturing tools and equipment. As a Thermal Fluids focus in mechanical engineering, Lorenzo has an extensive knowledge of complex mechanical systems which he applies to all projects he manages. His experience is multi-disciplinary and he is well versed in the electrical engineering, structural engineering and building design standards as well.

SELECTED EXPERIENCE
City of San Jose | Camden Community Center Shelter
San Jose, California
City of San Jose | City Hall HVAC & Fire Alarm Controls Upgrade
San Jose, California
City of San Jose | City National Civic Auditorium | New HVAC System
San Jose, California
City of Dublin | HVAC & Roof Replacement
Dublin, California
City of Palo Alto | Replace Switchgear and Motor Control Center
Palo Alto, California
Confidential Client | Laboratory Renovatio
Livermore, California
Confidential Client | B298 ACU-05 Replacement
Livermore, California
California Military Department | Camp Roberts
Camp Roberts, California
City of Sunnyvale | Renovations for Internal Affairs at Community Center
Sunnyvale, California
Veterans Administration Medical Center | PRRC
Martinez, California
Veterans Administration Medical Center | Construct
Outpatient Mental Health Services
Mather, California
City of Menlo Park | MPOE Room HVAC Upgrades
Menlo Park, California
City of Menlo Park | Dispatch Radio Room HVAC Upgrades
Menlo Park, California
City of Menlo Park | 2021 Recreation Center HVAC Study
Menlo Park, California
City of Menlo Park | EV Charging Stations Install
Menlo Park, California
City of Milpitas | MEP Services for Fire Doors
Milpitas, California
City of Milpitas | Electrical Upgrades at Pump Stations Milpitas, California
City of Fremont | Development Center
Fremont, California
EDUCATION | PROFESSIONAL LICENSE
Bachelor of Science, Mechanical Engineering
San Jose State University
Professional Engineer
California #M36814 - 2013

AFFILIATIONS
American Society of Heating, Referigerating and AirConditioning Engineers Refrigeration Chair & Member
Association for Facilities Engineering
Member
U.S. Green Building Council
Member
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 121 of 244 ends

Appendix - Org Chart & Resumes | 27
Mrs. Aljuburi has 24 years of experience in HVAC design of commercial and industrial buildings, institutional facilities in addition to specialized mechanical systems such as clean rooms, wet and dry laboratories, health care and testing centers. She also serves as project manager, project engineer and a project coordinator depending on the project, and is responsible for the quality control management, team coordination and client relationships.

She is highly organized and has excellent internal & external team coordination skills. She is hands-on from the initial proposal and through the entire project management process including process plan coordination, design, plan submittals, change orders, construction administration support.

SELECTED EXPERIENCE
Confidential Client | Laboratory Renovatio
Livermore, California
Confidential Client | B298 ACU-05 Replacement
Livermore, California
City of Scotts Valley | Generator Installation at Senior and Community Center
Scotts Valley, California
City of Scotts Valley | City Hall HVAC
Scotts Valley, California
City of Menlo Park | BHCC Electric Dryer
Menlo Park, California
City of Menlo Park | MCC Electric Dryer
Menlo Park, California
City of Menlo Park | Dispatch Radio Room HVAC Upgradesr Menlo Park, California
City of Menlo Park | MPOE Room HVAC Upgrades
Menlo Park, California
Arista | 3510 Basset MEP
Santa Clara, California
Lockheed Martin | B157 Surveillance & Navigation
Sunnyvale, California
Lockheed Martin | Relocate Hazmat Storage
Sunnyvale, California
Lockheed Martin | B172 Mainframe Pump
Sunnyvale, California
Lockheed Martin | B157 SBIRS/FTA Labs
Sunnyvale, California
TDK/Headway | Building 1 | Phase 1 Expansion
Milpitas, California
Supermicro | B23 BI Rn Liquid Cooling
San Jose, California
Tesla | Backlight Lift Assist
Fremont, California
Tesla | F22-0073 GA3 Mezzanine Beam Removal
Fremont, California
EDUCATION | PROFESSIONAL LICENSE
Master of Science, Business Administration
University of Phoenix
Bachelor of Science, Mechanical Engineering
University of Technology, Baghdad Iraq
Leadership in Energy and Environmental Design
Accredited Professional (LEED AP)

AFFILIATIONS
American Society of Heating, Referigerating and AirConditioning Engineers Member
Iraqi Childrens Foundation
Member
Project Manager Network
Member
Association for Facilities Engineering
Member
Rotary Club of Santa Clara
Member
Dina Aljuburi, MBA, LEED AP

PROJECT MANAGER / MECHANICAL ENGINEER
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 122 of 244 ends

28 | Advance Design Consultants, Inc.

Ms. Bermani is a Certified Architect in California as well as holds the certifications of LEED AP and NCARB professional. She has 37 years of architectural experience. Ms. Bermani is responsible for the design of architectural elements including ADA, interior design, space planning and ingress and regress paths. She has ample experience in Master Planning, Feasibility Studies, design of new facilities, and renovations across governmental, commercial, educational and residential industries. She is well versed in District State Architect (DSA) processes and procedures.

SELECTED EXPERIENCE
City of San Jose | Fossa Night House
San Jose, California
City of San Jose | Camden Community Center Shelter
San Jose, California
City of Sunnyvale | Renovations for Internal Affairs at Community Center
Sunnyvale, California
City of Sunnyvale | DPS Emergency Generator Replacement Sunnyvale, California
City of Menlo Park | Rec Center HVAC
Menlo Park, California
City of Menlo Park | Fire Alarm
Menlo Park, California
California Military Department | Camp Roberts
Camp Roberts, California
California Military Department | Camp Roberts B6428
Reno for JLTV
Camp Roberts, California
California Military Department | Van Nuys Armory Fire
Protection
Van Nuys, California
Cal Vet | Conex Box Study
Fresno, California
Judicial Council of California | Bellflower Courthouse
Bellflower, California
Orange County Fair & Event Center| The Cultural Zone
Costa Mesa, California
Orange County Fair & Event Center| Administration
Building
Costa Mesa, California
Image Printing Solutions | New 19,100 SF Office Building Irvine, California
California State University, East Bay | Multi-Campus
Master Plan & Feasibility Studies
Hayward, California
California Sate University | Campus Sports Complex &
Tennis Team Building
Los Angeles, California
EDUCATION | PROFESSIONAL LICENSE
Bachelor of Arts, Architecture Engineering
University of Baghdad, School of Architecture
Architect
California C29420 - 2003
Leadership in Energy and Environmental Design
Accredited Professional (LEED AP)

AWARDS & RECOGNITION
ATI Creative Design Award & Exceptional Performance
November 2011
NMIIC Interfaith Bridge Builder Award
May 2011
ATI Exceptional Performance
September 2008
Women in Construction Award
January 1998

AFFILIATIONS
Newport, Mesa, Irvine Interfaith Council, (NMIIC)
Board of Directors
American Institute of Architects (AIA)
Member
Eman Bermani, AIA, NCARB, LEED AP

ARCHITECT
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 123 of 244 ends

Appendix - Org Chart & Resumes | 29
Roland Lazzarotto has over fifty years of experience in all facets of wet and dry labs, office, industrial, microelectronics and biotech architectural projects. Roland has also managed the design and construction of university buildings, medical office buildings, and data centers. He specializes in complex projects that require special attention due to complex program, multi-party clients, aggressive schedule, large size or existing conditions requiring special accommodations. He has experience with many projects where he was responsible for the front-end programming, site selection, site master planning and building design of many office and high tech facilities. In the past 25 years Roland has completed several hundred tenant improvement projects in Northern California that have included clean rooms, labs and various types of office developments. Roland is a talented award-winning designer who works well with a team. His approach is to keep in balance the main project drivers of time, money and scope. He has developed a reputation among co-workers, engineers and contractors as one who can be depended on and trusted. Roland enjoys the team approach of a design-build project and has been selected by many general contractors to be their architect.

SELECTED EXPERIENCE
Keysight Technologies | New Building for Anechoic Testing Chamber
Rancho Santa Margarita, California
Union Sanitary District | Lab and Operations Building
Programming
Union City, California
Chiron | Building M GMP Upgrade
Emeryville, California
Bionovo | Manufacturing Plant
Hayward, California
State of California | DOJ Crime Lab
Richmond, California
Bayer | Diagnostics Lab Design
Berkeley, California
Quantum/Maxtor | Testing Labs Design
Milpitas, California
GTE Government Systems | New High Security SCIF for
DOD
Mountain View, California
Ask Jeeves | Headquarters Office Expansion
Emeryville, California
Chevron Park | New Headquarters Site
San Ramon, California
EDUCATION | PROFESSIONAL LICENSE
Bachelor of Arts, Architecture
University of California, Berkeley
Architect
California C9635 - 1978
Leadership in Energy and Environmental Design
Accredited Professional (LEED)

AFFILIATIONS
International Society for Pharmaceutical Engineering
(ISPE)
Member
Lake Vera Mutual Water Co.

President
Fratellanza Club, Oakland)
Board Member
Roland Lazzarotto, AIA, LEED

ARCHITECT, LABORATORY LIAISON
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 124 of 244 ends

30 | Advance Design Consultants, Inc.

Mr. Youssefi is a Senior Mechanical Engineer at ADC. He is a registered professional engineer (P.E.) and a certified LEED AP. He brings over 15 years of extensive engineering experience in HVAC systems design. His expertise concentrates on projects including HVAC new Systems and Upgrades, Feasibility Studies, LEED design, Mechanical Systems Design, humidification/dehumidification, Central Boiler plants, Chiller Plants and Cooling Towers. He is able effectively coordinate with different trades, city departments, and utilitiy providers involved in project design in order to prepare a complete design. Mr. Youssefi has successfully completed multiple Federal and Municipal projects from conceptual phase till construction documents.

SELECTED EXPERIENCE
City of San Jose | Camden Community Center Shelter
San Jose, California
City of San Jose | Fossa Night House
San Jose, California
City of San Jose | City Hall HVAC & Fire Alarm Controls Upgrade
San Jose, California
Veterans Administration Medical Center | PRRC
Martinez, California
Veterans Administration Medical Center | Building 650
1st Floor Renovation
Mathers, California
Veterans Administration Medical Center | Construct
Outpatient Mental Health Services
Mather, California
Veterans Administration Medical Center | Building 100 & 101 Emergency Generator
Palo Alto, California
California Military Department | Camp Roberts
Camp Roberts, California
City of Palo Alto | Lucie Stern Buildings
Palo Alto, California
Confidential Client | Laboratory Renovatio
Livermore, California
Confidential Client | B298 ACU-05 Replacement
Livermore, California
City of Milpitas | Community Center HVAC
Milpitas, California
City of Vallejo | Full MEP Services for Design Vallejo Transit Center
Vallejo, California
City of Dublin | HVAC & Roof Replacement
Dublin, California
City of Gilroy| Back up Generator
Gilroy, California
Santa Clara County | Main Jail South | Control Room
Upgrades
San Jose, California
City of Sunnyvale | DPS Emergency Generator Replacement Sunnyvale, California
City of Sunnyvale | City Hall Annex Generator
Sunnyvale, California
EDUCATION | PROFESSIONAL LICENSE
Bachelor of Science, Mechanical Engineering
University of Iran Science and Technology
Professional Engineer
California #M33044 - 2006

AFFILIATIONS
American Society of Heating, Referigerating and AirConditioning Engineers Member
Gewargis Youssefi, LEED AP, PE

SENIOR MECHANICAL/HVAC ENGINEER
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 125 of 244 ends

Appendix - Org Chart & Resumes | 31
Mr. Hernandez has extensive experience in electrical systems study and design, power modules and power distribution. He has successfully completed projects for Industrial and Commercial clients as well as local and federal government agencies. Mr. Hernandez’s areas of expertise include power system engineering, preparation of drawings, specifications and equipment selection, power distribution design and modifications for code compliance. Mr. Hernandez has completed fault current analysis, short circuit studies, arc flashing and electrical systems coordination for over 20 projects.

SELECTED EXPERIENCE
California Military Department | Camp Roberts
Camp Roberts, California
City of San Jose | Camden Community Center Shelter
San Jose, California
City of San Jose | Fossa Night House
San Jose, California
City of San Jose | Plaza Meter Upgrade
San Jose, California
City of San Jose | City Hall Annex Parking Lot
San Jose, California
City of San Jose | City National Civic Auditorium | New HVAC System
San Jose, California
City of Sunnyvale | DPS Emergency Generator Replacement Sunnyvale, California
City of Sunnyvale | Renovations for Internal Affairs at Community Center
Sunnyvale, California
City of Palo Alto | Replace Switchgear and Motor Control Center
Palo Alto, California
City of Palo Alto | Lucie Stern Buildings
Palo Alto, California
City of Menlo Park | EV Charging Stations Install
Menlo Park, California
City of Milpitas | MEP Services for Fire Doors
Milpitas, California
City of Milpitas | Electrical Upgrades at Pump Stations Milpitas, California
City of Dublin | HVAC & Roof Replacement
Dublin, California
City of Gilroy | Back up Generator
Gilroy, California
City of Mountain View | Five 150kW Generators to serve
Water Well Site
Mountain View, California
Veterans Administration Medical Center | PRRC
Martinez, California
Veterans Administration Medical Center | Building 100 & 101 Emergency Generator
Palo Alto, California
Confidential Client | Laboratory Renovatio
Livermore, California
Confidential Client | B298 ACU-05 Replacement
Livermore, California
Lawrence Berkeley National Lab | ALS Controls HVAC
Upgrade Retrofit
Berkeley, California
EDUCATION | PROFESSIONAL LICENSE
Bachelor of Science, Electrical Engineering
University of Oklahoma
Professional Engineer
California #22586 - 2018

AFFILIATIONS
The Institute of Electrical and Electronic Engineers
Senior Member
Alex Hernandez, PE

SENIOR ELECTRICAL ENGINEER
DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 126 of 244 ends

32 | Advance Design Consultants, Inc.

Mr. Hammond brings over 29 years of engineering experience, and holds a Bachelor’s of Science in Mechanical Engineering from the State University of New York at Stonybrook. David has extensive experience working with HVAC cooling and heating load calculations, Chilled water plants, Boiler Plants. His areas of expertise include chiller sizing, boiler sizing, system layout and piping design, plumbing layout and design for commercial buildings. Having been a part of multiple boiler replacements with the ADC team, David is very well experienced and understanding of the necessary requirements of the boiler installation and replacement processes.

SELECTED EXPERIENCE
City of San Jose | Camden Community Center Shelter
San Jose, California
City of San Jose | City National Civic Auditorium | New HVAC System
San Jose, California
City of San Jose | City Hall HVAC & Fire Alarm Controls Upgrade
San Jose, California
City of Dublin | HVAC & Roof Replacement
Dublin, California
City of Palo Alto | MSC Gas Line Upgrade
Palo Alto, California
City of Palo Alto | Lucie Stern Buildings
Palo Alto, California
City of Palo Alto | LED Lighting for VTA
Palo Alto, California
City of Sunnyvale | DPS Emergency Generator Replacement Sunnyvale, California
City of Milpitas | MEP Services for Fire Doors
Milpitas, California
City of Menlo Park | Park Recreation Center HVAC Study
Menlo Park, California
City of Fremont | Community Center HVAC
Fremont, California
Confidential Client | Laboratory Renovatio
Livermore, California
Confidential Client | B298 ACU-05 Replacement
Livermore, California
City of Gilroy| Back up Generator
Gilroy, California
Veterans Administration Medical Center | Construct
Outpatient Mental Health Services
Mather, California
Veterans Administration Medical Center | PRRC
Martinez, California
Veterans Administration Medical Center | Building
6501st Floor Renovations
Mathers, California
TDK/Headway Technologies | Phase 2 Expansion
Milpitas, California
California Military Department | Camp Roberts
Camp Roberts, California
Cal Vet | Conex Box Study
Fresno, California
EDUCATION | PROFESSIONAL LICENSE
Bachelor of Science, Mechanical Engineering
State University of New York at Stonybrook
Professional Engineer
California #M30389 - 1995
New York #16 073561
Alaska #ME13606

AFFILIATIONS
American Society of Heating, Referigerating and AirConditioning Engineers Member
Association for Facilities Engineering
Member
David Hammond, PE

SENIOR PLUMBING, PROCESS PIPING & AUTOMATION CONTROLS ENGINEER DocuSign Envelope ID: 906990F2-2BF7-4EA8-935A-5519603CBFB0 Exhibit "C" - Proposal

Page 127 of 244 ends