Task 1.1: Sampling and Analysis Plan
Anchor QEA will prepare a Sampling and Analysis Plan (SAP) for sample collection and analytical testing of sediments from Brisbane Marina and entrance channel. The SAP will be prepared in accordance with the following:
• Evaluation of Dredged Material Proposed for Discharge in Waters of the U.S. – Inland Testing Manual (ITM)
• PN 01-01: Guidelines for Implementing the Inland Testing Manual in the San Francisco Bay Region
The SAP will detail the sampling and analysis methods followed during field sample collection and laboratory analyses to determine sediment suitability for in-Bay disposal at SF-11. An electronic draft SAP will be submitted to the City for review. One round of review with minimal revisions is anticipated.

The final SAP will be distributed to DMMO agencies and the City. Prior to sampling, Anchor QEA will present the project and seek approval of the SAP by the DMMO at a DMMO meeting.

As part of Task 1.1, Anchor QEA will also develop a Health and Safety Plan that will provide background information, emergency phone numbers, the route to the nearest hospital, potential chemicals of concern, personal protective equipment requirements, key personnel responsibilities, and health and safety procedures.

Subtask 1.2: Sample Collection and Laboratory Analysis
Sediment cores will be collected at approximately 16 stations using a vibracore by Anchor QEA and our subcontractor Leviathan Environmental Services. It is anticipated that two cores will be required at each station to collect enough sediment for testing. Reference sediment would be collected from the SF-11 reference site by our subcontractor Brezina and Associates.

Individual core and Z-layer samples will be archived from each station. Depending on composite sample results, limited chemical analysis of individual core or Z-layer samples may be required by the DMMO. An individual core sample would only be analyzed if there is a need to refine the dredge unit based on elevated chemistry. A Z-layer sample would only be analyzed to characterize the newly exposed surface layer if the dredged material exhibited elevated chemical concentrations. Additional analysis of individual core and Z-layer samples is not included in this cost estimate.

In accordance with DMMO guidelines, four composite samples will be submitted for chemical analysis and biological testing to determine suitability for disposal at SF-11. Sediment chemistry will include total solids, total organic carbon, grain size, metals, organotins, polycyclic aromatic hydrocarbons, organochlorine pesticides, and polychlorinated biphenyls. Based on recent sediment characterization studies, it is also anticipated that DMMO will request analysis of dioxin/furans because dioxin/furans have not been tested at this site before. This cost estimate also includes analysis of dioxin/furans. Biological testing for in-Bay disposal will include one water column and two 7 264
I.

August 11, 2025

Page 3 ends

benthic toxicity tests. During the benthic toxicity testing, reference sediment will be tested concurrently with composite samples for comparative purposes.

Biological testing and chemical analysis would be performed by our subcontracted laboratories, Pacific EcoRisk, Inc., and Physis Environmental Laboratories, Inc., respectively. Anchor QEA will perform data validation to ensure laboratory analyses meet the project data quality objectives.

Subtask 1.3: Sampling and Analysis Report
Anchor QEA will produce a Sampling and Analysis Report (SAR) detailing results of testing, final sampling locations, any deviations from the SAP, and conclusions regarding the suitability of dredged material placement at SF-11. The SAR will be prepared in accordance with the ITM and PN-01-01 and DMMO guidelines. An electronic draft SAR will be submitted to the City for review.

One review round with minimal revisions is anticipated. The final SAR will be distributed to DMMO agencies and the City. Final concurrence on dredged material suitability will be requested at a DMMO meeting.

Assumptions
Assumptions for Task 2 are as follows:
• No new survey is required (March 2025 survey is acceptable to DMMO). • Based on the estimated volume of 225,000 cubic yards, sediment cores will be collected at approximately 16 stations within four dredge units. Changes to this volume may impact the number of dredge units, sampling locations, and costs.
• Anchor QEA will spend 4 days in the field collecting and processing sediment cores, plus mobilization and demobilization. DMMO requests for additional sampling locations or dredge units may affect the duration of field activities and costs. • Four composite samples will be submitted for physical, chemical, and biological testing. • One reference sample will be submitted for benthic toxicity testing. • Bioaccumulation testing will not be required. If bioaccumulation triggers are exceeded, additional testing and tissue analysis will be required resulting in additional costs. • The complete analyte list will be subject to DMMO approval. • Analysis of individual cores and Z-layer samples will not be required. • Anchor QEA will attend one DMMO meeting to discuss the SAP and one DMMO meeting to discuss the SAR.

Task 2: Preliminary Dredge Design Documents
Anchor QEA will prepare draft 60% dredge design documents, including drawings, technical specifications, an opinion of probable costs, and a bid form for the dredging work. The 2015 dredge episode design will be used as a basis of the design. Design development will include evaluating dredging production rates, construction timelines, and potential dredging phasing options. The 8 265
I.

August 11, 2025

Page 4 ends

development of these documents will occur concurrently with the permitting and sediment investigation processes to the extent feasible.

The design drawings will depict site features necessary to inform a dredging contractor of existing site conditions, including site bathymetry; existing shorelines, docks, marine features, and structures; site mooring areas and access restrictions (if any); required dredge template (i.e., extents and limits of dredging); dredging side slopes; allowable overdepth limits; and typical cross sections. The CAD files that Anchor QEA developed for the previous dredging episode will be the initial starting point and reduce the time needed to create the dredge prism. If there has been a change to any infrastructure (new structures or demolitions), we will request the as-builts from the City.

The technical specifications will include detailed requirements for dredging and disposal of material at an in-Bay disposal location, in compliance with all permit conditions and environmental restrictions known at the time of preparation. Key input from the previous dredging episode specifications will be used to inform the technical specifications. If there are new engineering requirements by the City or updates to the City’s technical specifications packages, we ask that the City provide those as early in the design process as possible (within 2 weeks after the kick-off meeting). A bid form will be included in the technical specifications package, which will contain estimates of payable dredge quantities, potentially subdivided according to different dredging areas.

The design drawings and technical specifications will be prepared in a manner to be incorporated into a standard bid package provided by the City, which is anticipated to include the City’s Standard Agreement, Contract Terms (including bonding requirements, payment provisions, and insurance requirements), and General Conditions. We have assumed that contract documents, aside from our drawings and technical specifications, will be provided by the City, and the City will create the complete contract package, consistent with previous construction projects conducted by the City.

We will submit a draft (60%) set of design documents to the City for review and discussion, followed by a draft 90% set for City review, followed by a final (100%) set signed and stamped for bid solicitation (anticipated to be approved under a subsequent scope of work). We assume all deliverables will be submitted to the City in electronic format only.

Assumptions
Assumptions for Task 2 are as follows:
• Upland and shoreline topographic survey information, including location and geometry of adjacent structures, and the presence and location of utilities, is assumed to be the same as per the prior episode.
• The design depths will not exceed the original design depths alongside structures and guide piles at the site. We have therefore assumed it will not be necessary to analyze the stability of existing offshore and nearshore structures.
9 266
I.

August 11, 2025

Page 5 ends

• Sediment is anticipated to be disposed of at an in-Bay disposal location (SF-10 or SF-11) rather than at an upland landfill facility.
• The drawing package will be comprised of nine sheets, similar to the 2015 dredge drawings. • Anchor QEA will attend one site visit with the City, as well as up to two meetings (virtual or in person, as appropriate) with the City during the design process. • Any City-requested changes to the draft 90% design documents will be minor in nature, such as grammar correction or formatting. No material changes to the project will be incorporated beyond this phase.
• Bid solicitation and construction management is not included in this scope.

Schedule
We anticipate completing the sampling and 60% design documents within six months of notice to proceed. Permitting and final design (90%, 100%) should be initiated no later than upon approval of the Sampling and Analysis report to maintain schedule for construction in 2026. A separate scope of work and cost estimate for these tasks will be submitted.

Proposed Staff
With the exception of the laboratory analyses and sediment sample vessel collection, all work required to fulfill this scope of work will be completed by Anchor QEA staff, predominately located in our San Francisco, California, office. Dr. Joshua Burnam will be Anchor QEA’s Principal-in-Charge and overall project manager. He will be supported by Katie Chamberlin and Marine Vie, who will be our local point of contact and agency liaison for the regulatory permitting task, respectively; Chis Osuch, who will manage sediment characterization efforts; and Megan Collins, PE, and Amy Williams, PE, who will develop the engineering deliverables. Other Anchor QEA staff will provide oversight and guidance as required.

Estimated Costs
The total cost for completing Tasks 1 and 2 is $200,000, which is based on a time-and-materials, notto-exceed basis. Our current rates are included as Attachment 1.

Table 1
Proposed Costs
Task Description Anchor QEA Costs

1.1 Sampling and Analysis Plan $16,300

1.2 Sample Collection and Laboratory Analysis $139,400

1.3 Sampling and Analysis Report $16,800
2 Preliminary Dredge Design $27,500
Total $200,000
10 267
I.

August 11, 2025

Page 6 ends

We appreciate the opportunity to provide this cost proposal and look forward to beginning these project tasks. Please do not hesitate to contact me at [email protected], or at (415) 230-0862, if there are any questions or concerns with this proposal.

Sincerely,
Joshua Burnam, MPH, D.Env.

Principal Environmental Planner
Attachment
Attachment 1 Project Billing Rates
11 268
I.

Attachment 1
Project Billing Rates
12 269
I.

This is a company confidential document.

Anchor QEA
2025 BILLING RATES
Professional Level Hourly Rates
Principal CM1/Engineer/LA2/Planner/Scientist ...................................................................................................... $337 Senior Managing Analyst/CM/Engineer/LA/Planner/Scientist........................................................................ $306 Managing Analyst/CM/Engineer/LA/Planner/Scientist ...................................................................................... $284 Senior Analyst/CM/Engineer/LA/Planner/Project Manager/Scientist........................................................... $254 Staff 3 Analyst/CM/Engineer/LA/Planner/Scientist.............................................................................................. $221 Staff 2 Analyst/CM/Engineer/LA/Planner/Scientist.............................................................................................. $199 Staff 1 Analyst/CM/Engineer/LA/Planner/Scientist.............................................................................................. $168 Senior CAD3 Designer...................................................................................................................................................... $173 CAD Designer...................................................................................................................................................................... $146 Senior Field Technician ................................................................................................................................................... $154 Technician ............................................................................................................................................................................ $140 Senior Technical Editor.................................................................................................................................................... $172 Technical Editor.................................................................................................................................................................. $147 Senior Project Coordinator............................................................................................................................................ $164 Project Coordinator.......................................................................................................................................................... $135 Special Hourly Rates
National expert consultant............................................................................................................................................ $561 All work by a testifying expert.................................................................................1.5 times professional level rate Expert Advisor..................................................................................................................................................................... $431

EXPENSE BILLING RATES
Expense Rates
Technology Fee (of billed labor)......................................................................................................................................5% Mileage (per mile)......................................................................................................................Current federal standard

FEE ON LABOR AND EXPENSE CHARGES
Subcontracts/subconsultants .........................................................................................................................................10% Travel and other direct costs ..........................................................................................................................................10% Field equipment and supplies ........................................................................................................................................10% 1 CM: Construction Manager 2 LA: Landscape Architect 3 CAD: Computer-Aided Design 13 270
I.

PURCHASE ORDER
09/29/2025
ISSUED TO:

Date:

Vendor #: ANC01

ANCHOR QEA LLC
1201 3RD AVE STE 2600
SEATTLE, WA 98101-
SHIP TO: Corp Yard
1020 Tunnel Road
Brisbane, CA 94005
PO Number: PO2600468
Requisition #: R2600569
50 Park Place
Brisbane, CA 94005
PH: (415) 508-2100

CITY OF BRISBANE
ITEM UNITS DESCRIPTION GL ACCT # PROJ ACCT # PRICE AMOUNT 1 0
6-425f-96e1-b367010d8956
MARINA DREDGING 2026-ADDITIONAL TESTING
7215b89b-4f06-425f-96e1-b367010d8956
550-7009-000-52030 0.00 24,000.00
7215b89b-4f06-425f-96e1-b367010d8956 7215b89b-4f06-425f-96e1-b367010d8956 TOTAL 24,000.00
SUBTOTAL:

0.00 24,000.00
SHIPPING:

Authorized by: TOTAL TAX: 0.00
Attachment 2
14 271
I.
15 272
I.
16 273
I.

December 17, 2025
33 New Montgomery Street, Suite 1210
San Francisco, California 94105
415.230.0862
Mr. Maziar Bozorginia
Director of Public Works
City of Brisbane
50 Park Place
Brisbane, California 94005-1310
Re: Scope of Work and Cost Proposal - Continuing
Brisbane Marina Maintenance Dredging Support, 2026 Episode Dear Mr. Bozorginia,
Anchor QEA is pleased to submit this continuing scope of work and cost proposal to support the City of Brisbane’s (City’s) upcoming maintenance dredging needs at Brisbane Marina. This scope of work combines current and prior requests into one document.

Please note that tasks 1-2 of the below in the amount of $224,000 were previously approved.

Proposed Scope of Work
Task 1: Sediment Characterization and Dredged Material Management Office Coordination
Based on the preliminary dredge volume estimate of 225,000 cubic yards, the marina and entrance channel will be divided into four dredge units for sampling and analysis activities. Consistent with the last dredging episode in 2015, proposed dredge material will be evaluated for in-Bay disposal at the Alcatraz Island (SF-11) disposal site. The following subtasks summarize the steps necessary to obtain a suitability determination from the DMMO.

Task 1.1: Sampling and Analysis Plan
Anchor QEA will prepare a Sampling and Analysis Plan (SAP) for sample collection and analytical testing of sediments from Brisbane Marina and entrance channel. The SAP will be prepared in accordance with the following:
• Evaluation of Dredged Material Proposed for Discharge in Waters of the U.S. – Inland Testing Manual (ITM)
• PN 01-01: Guidelines for Implementing the Inland Testing Manual in the San Francisco Bay Region
The SAP will detail the sampling and analysis methods followed during field sample collection and laboratory analyses to determine sediment suitability for in-Bay disposal at SF-11. An electronic draft Attachment 3
17 274
I.

December 17, 2025

Page 2 ends

SAP will be submitted to the City for review. One round of review with minimal revisions is anticipated.

The final SAP will be distributed to DMMO agencies and the City. Prior to sampling, Anchor QEA will present the project and seek approval of the SAP by the DMMO at a DMMO meeting.

As part of Task 1.1, Anchor QEA will also develop a Health and Safety Plan that will provide background information, emergency phone numbers, the route to the nearest hospital, potential chemicals of concern, personal protective equipment requirements, key personnel responsibilities, and health and safety procedures.

Subtask 1.2: Sample Collection and Laboratory Analysis
Sediment cores will be collected at approximately 16 stations using a vibracore by Anchor QEA and our subcontractor Leviathan Environmental Services. It is anticipated that two cores will be required at each station to collect enough sediment for testing. Reference sediment would be collected from the SF-11 reference site by our subcontractor Brezina and Associates.

Individual core and Z-layer samples will be archived from each station. Depending on composite sample results, limited chemical analysis of individual core or Z-layer samples may be required by the DMMO. An individual core sample would only be analyzed if there is a need to refine the dredge unit based on elevated chemistry. A Z-layer sample would only be analyzed to characterize the newly exposed surface layer if the dredged material exhibited elevated chemical concentrations. Additional analysis of individual core and Z-layer samples is not included in this cost estimate.

In accordance with DMMO guidelines, four composite samples will be submitted for chemical analysis and biological testing to determine suitability for disposal at SF-11. Sediment chemistry will include total solids, total organic carbon, grain size, metals, organotins, polycyclic aromatic hydrocarbons, organochlorine pesticides, and polychlorinated biphenyls. Based on recent sediment characterization studies, it is also anticipated that DMMO will request analysis of dioxin/furans because dioxin/furans have not been tested at this site before. This cost estimate also includes analysis of dioxin/furans. Biological testing for in-Bay disposal will include one water column and two benthic toxicity tests. During the benthic toxicity testing, reference sediment will be tested concurrently with composite samples for comparative purposes.

Biological testing and chemical analysis would be performed by our subcontracted laboratories, Pacific EcoRisk, Inc., and Physis Environmental Laboratories, Inc., respectively. Anchor QEA will perform data validation to ensure laboratory analyses meet the project data quality objectives.

Subtask 1.3: Sampling and Analysis Report
Anchor QEA will produce a Sampling and Analysis Report (SAR) detailing results of testing, final sampling locations, any deviations from the SAP, and conclusions regarding the suitability of dredged material placement at SF-11. The SAR will be prepared in accordance with the ITM and PN-01-01 and DMMO guidelines. An electronic draft SAR will be submitted to the City for review. 18 275
I.

December 17, 2025

Page 3 ends

One review round with minimal revisions is anticipated. The final SAR will be distributed to DMMO agencies and the City. Final concurrence on dredged material suitability will be requested at a DMMO meeting.

Assumptions
Assumptions for Task 2 are as follows:
• No new survey is required (March 2025 survey is acceptable to DMMO). • Based on the estimated volume of 225,000 cubic yards, sediment cores will be collected at approximately 16 stations within four dredge units. Changes to this volume may impact the number of dredge units, sampling locations, and costs.
• Anchor QEA will spend 4 days in the field collecting and processing sediment cores, plus mobilization and demobilization. DMMO requests for additional sampling locations or dredge units may affect the duration of field activities and costs. • Four composite samples will be submitted for physical, chemical, and biological testing. • One reference sample will be submitted for benthic toxicity testing. • Bioaccumulation testing will not be required. If bioaccumulation triggers are exceeded, additional testing and tissue analysis will be required resulting in additional costs. • The complete analyte list will be subject to DMMO approval. • Analysis of individual cores and Z-layer samples will not be required. • Anchor QEA will attend one DMMO meeting to discuss the SAP and one DMMO meeting to discuss the SAR.

Task 2: Preliminary Dredge Design Documents
Anchor QEA will prepare draft 60% dredge design documents, including drawings, technical specifications, an opinion of probable costs, and a bid form for the dredging work. The 2015 dredge episode design will be used as a basis of the design. Design development will include evaluating dredging production rates, construction timelines, and potential dredging phasing options. The development of these documents will occur concurrently with the permitting and sediment investigation processes to the extent feasible.

The design drawings will depict site features necessary to inform a dredging contractor of existing site conditions, including site bathymetry; existing shorelines, docks, marine features, and structures; site mooring areas and access restrictions (if any); required dredge template (i.e., extents and limits of dredging); dredging side slopes; allowable overdepth limits; and typical cross sections. The CAD files that Anchor QEA developed for the previous dredging episode will be the initial starting point and reduce the time needed to create the dredge prism. If there has been a change to any infrastructure (new structures or demolitions), we will request the as-builts from the City. 19 276
I.

December 17, 2025

Page 4 ends

The technical specifications will include detailed requirements for dredging and disposal of material at an in-Bay disposal location, in compliance with all permit conditions and environmental restrictions known at the time of preparation. Key input from the previous dredging episode specifications will be used to inform the technical specifications. If there are new engineering requirements by the City or updates to the City’s technical specifications packages, we ask that the City provide those as early in the design process as possible (within 2 weeks after the kick-off meeting). A bid form will be included in the technical specifications package, which will contain estimates of payable dredge quantities, potentially subdivided according to different dredging areas.

The design drawings and technical specifications will be prepared in a manner to be incorporated into a standard bid package provided by the City, which is anticipated to include the City’s Standard Agreement, Contract Terms (including bonding requirements, payment provisions, and insurance requirements), and General Conditions. We have assumed that contract documents, aside from our drawings and technical specifications, will be provided by the City, and the City will create the complete contract package, consistent with previous construction projects conducted by the City.

We will submit a draft (60%) set of design documents to the City for review and discussion, followed by a draft 90% set for City review, followed by a final (100%) set signed and stamped for bid solicitation (anticipated to be approved under a subsequent scope of work). We assume all deliverables will be submitted to the City in electronic format only.

Assumptions
Assumptions for Task 2 are as follows:
• Upland and shoreline topographic survey information, including location and geometry of adjacent structures, and the presence and location of utilities, is assumed to be the same as per the prior episode.
• The design depths will not exceed the original design depths alongside structures and guide piles at the site. We have therefore assumed it will not be necessary to analyze the stability of existing offshore and nearshore structures.
• Sediment is anticipated to be disposed of at an in-Bay disposal location (SF-10 or SF-11) rather than at an upland landfill facility.
• The drawing package will be comprised of nine sheets, similar to the 2015 dredge drawings. • Anchor QEA will attend one site visit with the City, as well as up to two meetings (virtual or in person, as appropriate) with the City during the design process. • Any City-requested changes to the draft 90% design documents will be minor in nature, such as grammar correction or formatting. No material changes to the project will be incorporated beyond this phase.
• Bid solicitation and construction management is not included in this scope. 20 277
I.

December 17, 2025

Page 5 ends

Task 3: Permitting
Anchor QEA will prepare and submit the Dredged Material Management Office (DMMO) Consolidated Dredging Permit application to obtain permits covering the City’s proposed dredging work. The City’s prior permits have expired since the last episode, but we will make use of those materials to apply for renewed permits to the extent feasible.

The following permits will be obtained for the proposed dredging work:
• 10-year permit from the U.S. Army Corps of Engineers
• Endangered Species Act Section 7 concurrence letters from the National Marine Fisheries Service and U.S. Fish and Wildlife Service
• 10-year permit from the San Francisco Bay Conservation and Development Commission • Section 401 Water Quality Certification from the San Francisco Bay Regional Water Quality Control Board
• Notification only to the California State Lands Commission To obtain the required state and federal permits and approvals, Anchor QEA will prepare the following documents:
• Permit application forms
• A memorandum containing supplemental information that will be needed for permit issuance but cannot easily fit into the agency form templates
To streamline the project, the permitting process will be conducted parallel to the sediment characterization effort (in progress). Anchor QEA will prepare draft versions of these documents for review by the City. After addressing comments, we will prepare final versions of each document and submit them to the respective agencies for review and processing. After submitting applications, Anchor QEA will remain in close contact with the regulatory agencies issuing permits or approvals for the project. We will respond to agency comments, inquire regularly for status updates, and coordinate with agency points of contact as needed throughout the process of the issuance of permits. Anchor QEA will review all issued permits to determine if the permit conditions are feasible or if they prompt further discussions from the agencies.

Assumptions
Assumptions for Task 3 are as follows:
• All dredging is maintenance dredging, not new work.
• Dredging will occur within the established window of June 1 through November 30. • The project will qualify for the Small Dredger Programmatic Alternatives Analysis and will not require preparation of an Integrated Alternatives Analysis. • The DMMO application will be completed to state and federal standards. Anchor QEA will respond to agency comments on the DMMO application.
21 278
I.

December 17, 2025

Page 6 ends

• Anchor QEA will coordinate and lead a virtual pre-application meeting. • Anchor QEA will develop draft and final versions of the application forms and supplement.

Anchor QEA will address one round of comments from the City on these documents. • Anchor QEA will attend up to two virtual meetings with the regulatory agencies, if required. • A California State Lands Commission dredging lease will not be required (confirmed during the previous 2015 dredging episode).
• No cultural resources memorandum will be provided for this effort; because the project is proposing maintenance dredging in an area that was previously dredged, there is no potential to encounter archeological and/or cultural resources.
• The Dredge Operations Plan for the 2026 dredging episode will be completed by the contractor, as specified in Task 3.
• The City will prepare a California Environmental Quality Act notice of exemption (similar to the previous 2015 dredging episode).
• Preparation of a biological assessment, biological surveys, and fieldwork is excluded from this scope of work.
• An Incidental Take Permit (ITP) from California Department of Fish and Wildlife (CDFW) will not be required because the project will not result in the “take” of state-listed special status species. By working within the established window, constraining the project to previously dredged areas, and minimizing the upland footprint of the project through using an established placement site, an ITP should be avoidable; however, if CDFW determines that the project requires an ITP, Anchor QEA would require additional funds to perform the additional work. • The City will provide proof of legal interest for the permit applications. • The City will be responsible for all permit fees.

Task 4: Dredge Design Documents – 90 and 100%
Anchor QEA will prepare draft 90%, and final 100% dredge design documents, including drawings, technical specifications, an opinion of probable costs, and a bid form for the dredging work. The 2015 dredge episode design will be used as a basis of the design. Design development will include evaluating dredging production rates, construction timelines, and potential dredging phasing options. The development of these documents will occur concurrently with the permitting and sediment investigation processes to the extent feasible.

The design drawings will depict site features necessary to inform a dredging contractor of existing site conditions, including site bathymetry; existing shorelines, docks, marine features, and structures; site mooring areas and access restrictions (if any); required dredge template (i.e., extents and limits of dredging); dredging side slopes; allowable overdepth limits; and typical cross sections. The CAD files that Anchor QEA developed for the previous dredging episode will be the initial starting point and reduce the time needed to create the dredge prism. If there has been a change to any infrastructure (new structures or demolitions), we will request the as-builts from the City. 22 279
I.

December 17, 2025

Page 7 ends

The technical specifications will include detailed requirements for dredging and disposal of material at an in-Bay disposal location, in compliance with all permit conditions and environmental restrictions known at the time of preparation. Key input from the previous dredging episode specifications will be used to inform the technical specifications. If there are new engineering requirements by the City or updates to the City’s technical specifications packages, we ask that the City provide those as early in the design process as possible (within 2 weeks after the kick-off meeting). A bid form will be included in the technical specifications package, which will contain estimates of payable dredge quantities, potentially subdivided according to different dredging areas.

The design drawings and technical specifications will be prepared in a manner to be incorporated into a standard bid package provided by the City, which is anticipated to include the City’s Standard Agreement, Contract Terms (including bonding requirements, payment provisions, and insurance requirements), and General Conditions. We have assumed that contract documents, aside from our drawings and technical specifications, will be provided by the City, and the City will create the complete contract package, consistent with previous construction projects conducted by the City.

We assume all deliverables will be submitted to the City in electronic format only.

Assumptions
Assumptions for Task 4 are as follows:
• Upland and shoreline topographic survey information, including location and geometry of adjacent structures, and the presence and location of utilities, is assumed to be the same as per the prior episode.
• The design depths will not exceed the original design depths alongside structures and guide piles at the site. We have therefore assumed it will not be necessary to analyze the stability of existing offshore and nearshore structures.
• Sediment is anticipated to be disposed of at an in-Bay disposal location (SF-10 or SF-11) rather than at an upland landfill facility.
• The drawing package will be comprised of nine sheets, similar to the 2015 dredge drawings. • Anchor QEA will attend one site visit with the City, as well as up to two meetings (virtual or in person, as appropriate) with the City during the design process. • Any City-requested changes to the draft 90% design documents will be minor in nature, such as grammar correction or formatting. No material changes to the project will be incorporated beyond this phase.
• Bid solicitation and construction management is not included in this scope.

Task 5: Additional Sediment Characterization Support
Anchor QEA is currently characterizing sediment from Brisbane Marina to determine suitability for inBay disposal at the Alcatraz Island (SF-11) disposal site and beneficial reuse at the Cullinan Ranch 23 280
I.

December 17, 2025

Page 8 ends

Restoration Project (CRRP) and Montezuma Wetland Restoration Projection (MWRP). Sediment sampling was conducted from November 10 to 12, 2025, and composite sediment samples were submitted for sediment chemistry, in-Bay biological testing, and modified elutriate test (MET) chemistry and bioassay testing.

Composite sediment chemistry results showed elevated concentrations of DDTs (above in-Bay bioaccumulation trigger and beneficial reuse criteria for cover and foundation), polychlorinated biphenyls (PCBs; above in-Bay bioaccumulation trigger and total maximum daily load [TMDL] limit), and polycyclic aromatic hydrocarbons (PAHs; above the beneficial reuse criteria for cover). Based on these results, additional testing is required for in-Bay disposal and beneficial reuse at MWRP as foundation material. To allow for additional management alternatives, additional testing will also be conducted to determine suitability for ocean disposal at the San Francisco Deep Ocean Disposal Site (SFDODS).

As part of this task, the following tests will be performed:
• Individual core chemistry for DDTS at one dredge unit (BM-DU4) • Z-layer composite chemistry for DDTs and PCBs at two dredge units (BM-DU1 and BM-DU4) • Deionized waste extraction test (DI-WET) at all dredge units for metals, pesticides, PAHs, and/or PCBs
• Bioaccumulation testing using two species (contracted directly with Pacific EcoRisk and not included as part of this scope of work)
• Bioaccumulation tissue chemistry for lipids, DDTs, and/or PCBs. This will include a composite of all replicates for each treatment.
• Suspended particulate phase testing using two species (contracted directly with Pacific EcoRisk and not included as part of this scope of work) Additional effort associated with this task includes coordination with the San Francisco Dredge Material Management Office (DMMO) and MWRP on the testing approach to obtain approval, data validation and management, data analysis, and reporting. Anchor QEA understands that the City has separately contracted with Pacific EcoRisk to handle laboratory services. Anchor QEA will coordinate with Pacific EcoRisk as needed.

Task 6: Project Management
This task includes an allowance for overall management of the project, including regular meetings, schedule updates, and invoicing for the project manager.

Future Tasks
This scope of work will be considered complete when our final (100%) design documents have been completed and submitted to the City. However, once the design plans have been prepared, 24 281
I.

December 17, 2025

Page 9 ends

Anchor QEA can also support the City in bidding and construction management to guide the project per the technical specifications and regulatory permits. Successful construction projects are attributable, in part, to effective and thorough oversight and management of the contractor’s work, and Anchor QEA’s experience in this regard could be a valuable addition to this project. For example, we commonly participate in and lead pre-bid site visits, provide input to the bid review process, review contractor pre-construction submittals, participate (in person or by phone) in selected construction meetings, and review contractor progress and post-dredge survey pay requests. A separate scope of work and cost estimate for these tasks will be prepared once our current tasks are completed.

Estimated Costs
Table 1 shows the task-specific breakdown of costs for each task. All of our included fee assumptions are dependent on Anchor QEA performing all listed services. Rates will be the same as our current approved scope of work.

Table 1
Proposed Costs
Task Description
Anchor QEA
Costs
1 Sediment Characterization and DMMO $196,500
2 Preliminary Dredge Design $27,500
3 Permitting $30,000
4 Dredge Design $32,500
5 Additional Sediment Characterization Support $62,000
6 Project Management $15,000
Total $363,500
We appreciate the opportunity to provide this cost proposal and look forward to beginning these project tasks. Please do not hesitate to contact me at [email protected], or at (415) 230-0862, if there are any questions or concerns with this proposal.

Sincerely,
Joshua Burnam, MPH, D.Env.

Principal Environmental Planner
25 282
I.
1 of 2
Thursday, November 20, 2025 at 9:21:04 PM Pacific Standard Time Subject:Subject:Subject:Subject: RE: Brisbane dredging - ROM cost evaluation Date: Thursday, November 13, 2025 at 7:40:24AM Pacific Standard Time From: Josh Burnam
To: Rehberg, Andrew, Bozorginia.Maziar
CC: Megan Collins, Amy Williams, Marine Vie
Andrew, Maziar – as a supplement to my email yesterday, here is a table showing a second column that equates to a “high” cost which is also based on some bids we have seen. We thought this might be helpful. Let us know if you want to have a call.

Josh
Entrance Channel and Marina Basin Dredging to
-8 6 MLLW-8 6 MLLW-8 6 MLLW-8 6 MLLW
Task Unit Unit Cost ($/CY) Unit Cost ($/CY)
Payable Payable Payable Payable
QuanFty (Design
Depth + 1 foot
overdepth)overdepth)overdepth)overdepth)
Total Cost Total Cost Total Cost Total Cost
(Low)
Total Cost Total Cost Total Cost Total Cost
(High)
Direct ConstrucFon Costs
MobilizaFon/DemobilizaFon
MobilizaFon/DemobilizaFon LS -- -- $570,400 $813,600
Dredging with Ocean Disposal at SF-11 (Depth + 1 foot paid overdepth) Entrance Channel CY $35 $50 53,960 $1,889,000 $2,698,000 Marina Areas 1-3 CY $35 $50 29,920 $1,048,000 $1,496,000 Marina Areas 4-11 CY $35 $50 75,480 $2,642,000 $3,774,000 Bathymetric Surveying
3rd party measurement and payment surveys unit $12,000 2 $24,000 $24,000 Total Direct ConstrucFon Costs, Base Bid Only $6,173,400$6,173,400$6,173,400$6,173,400 $8,805,600$8,805,600$8,805,600$8,805,600 OPTIONAL: Area 12 CY $35 $50 2,880 $101,000 $144,000
Total Direct ConstrucFon Costs including OpFonal Area $6,274,400$6,274,400$6,274,400$6,274,400 $8,949,600$8,949,600$8,949,600$8,949,600 Notes:

1. These esFmates were developed using current and generally accepted engineering cost esFmaFon methods. Note that these esFmates are based on assumpFons concerning future events, and actual costs may be affected by known and unknown risks including, but not limited to, changes in general economic and business condiFons, site condiFons that were unknown to Anchor QEA, Inc., at the Fme the esFmates were performed, future changes in site condiFons, regulatory or enforcement policy changes, and delays in performance. Actual costs may vary from these esFmates and such variaFons may be material. Anchor QEA, Inc., is not licensed as accountants or securiFes aborneys and, therefore, makes no representaFons that these costs form an appropriate basis for complying with financial reporFng requirements for such costs.

2. All cost esFmates include material, labor, and taxes, unless otherwise noted. Unit costs are esFmated using standard esFmaFng guides (e.g., Means Site Work and Landscape Cost Data), vendors, professional judgment, and experience from similar projects. Costs do not include so6 costs (i.e., design, permigng, inspecFons, or construcFon management), access costs, legal fees, agency oversight, or public relaFons efforts.

Joshua Burnam, MPH, D.Env. Joshua Burnam, MPH, D.Env. Joshua Burnam, MPH, D.Env.

Principal/Federal Market Sector Lead

ANCHOR QEA
[email protected]
33 New Montgomery St
Suite 1210, San Francisco, CA 94105
Direct      415.361.5150
Mobile    949.636.5166
From: Josh Burnam
Sent: Wednesday, November 12, 2025 1:18 PM
To: Rehberg, Andrew <[email protected]>; Bozorginia.Maziar <[email protected]> Cc: Megan Collins <[email protected]>; Amy Williams <[email protected]>; Marine Vie <[email protected]> Subject:Subject:Subject:Subject: Brisbane dredging - ROM cost evaluaFon Attach ment 4
26 283
I.
2 of 2
Maziar, Andrew – wanted to forward along an updated ROM construction cost estimate. This is based on our current view of the market, recent similar projects/bids we are aware of, and of course our knowledge of the last episode at the marina. As you can see from the table below, our rough estimate at this time is about $6.1-$6.3M for construction cost for all areas, with one area being optional as before.   We would have separate fees for construction oversight if you requested that of us (we did that last time). I wanted to provide this now so you can review and be informed.

If we allow dredgers to work outside the window by going to upland disposal sites, which we will present as an optional item to them, it’s possible some cost savings could be achieved, but we can’t specify that at this time. We are allowing for that option with our testing program. In case you are curious, the permits will be good for multiple years (5-10 depending on the permit) and the sediment results are usually good for 3 years.

Please let us know if you want to discuss this.

Thanks,
Josh
Entrance Channel and Marina
Basin Dredging to -8 6 MLLW
Task Unit
Unit
Cost
Payable
QuanFty (Design
Depth + 1 foot
overdepth) Cost
Direct ConstrucFon Costs
MobilizaFon/DemobilizaFon
MobilizaFon/DemobilizaFon LS -- -- $560,300
Dredging with Ocean Disposal at SF-11 (Depth + 1 foot paid overdepth) Entrance Channel CY $35 53,960 $1,889,000
Marina Areas 1-3 CY $35 29,920 $1,048,000
Marina Areas 4-11 CY $35 75,480 $2,642,000
Bathymetric Surveying
3rd party measurement and payment surveys unit $12,000 2 $24,000 Total Direct ConstrucFon Costs, Base Bid Only $6,163,300 OPTIONAL: Area 12 CY $35 2,880 $101,000
Total Direct ConstrucFon Costs including OpFonal Area $6,264,300 Notes:

1. These esFmates were developed using current and generally accepted engineering cost esFmaFon methods. Note that these esFmates are based on assumpFons concerning future events, and actual costs may be affected by known and unknown risks including, but not limited to, changes in general economic and business condiFons, site condiFons that were unknown to Anchor QEA, Inc., at the Fme the esFmates were performed, future changes in site condiFons, regulatory or enforcement policy changes, and delays in performance. Actual costs may vary from these esFmates and such variaFons may be material. Anchor QEA, Inc., is not licensed as accountants or securiFes aborneys and, therefore, makes no representaFons that these costs form an appropriate basis for complying with financial reporFng requirements for such costs.

2. All cost esFmates include material, labor, and taxes, unless otherwise noted. Unit costs are esFmated using standard esFmaFng guides (e.g., Means Site Work and Landscape Cost Data), vendors, professional judgment, and experience from similar projects. Costs do not include so6 costs (i.e., design, permigng, inspecFons, or construcFon management), access costs, legal fees, agency oversight, or public relaFons efforts. 27 284
I.

Rev. 1/26/99 -1-

AGREEMENT FOR PROFESSIONAL SERVICES
THIS AGREEMENT, dated _________________, is made by and between THE CITY OF BRISBANE, a municipal corporation ("City"), and ANCHOR QEA, a LIMITED LIABILITY COMPANY ("Consultant").

RECITALS
A. City desires to retain Consultant for the performance of certain professional design and permitting services for 2026 Marina Dredging Project ("the Project").

B. Consultant represents that Consultant is specially trained, experienced, and qualified to provide such professional services and is willing to do so pursuant to the terms and conditions of this Agreement.

AGREEMENT

1. Scope of Services. Subject to the direction and approval of City through its staff that City may provide from time to time, Consultant shall perform the services described in Exhibit A attached hereto and incorporated herein by reference.

2. Time of Performance. The services of Consultant shall commence upon the execution of this Agreement and shall be satisfactorily completed in accordance with the time schedule set forth in Exhibit B attached hereto and incorporated herein by reference.

3. Responsible Personnel. The personnel acting on behalf of Consultant primarily responsible for performance of the services hereunder shall be Joshua Burnam, Principal Environmental Planner.

4. Compensation. As compensation for all services to be performed by Consultant under this Agreement, Consultant shall be paid the amounts set forth in Exhibit C attached hereto and incorporated herein by reference. In no event shall Consultant's total compensation exceed the sum of $139,500 without additional authorization from City.

Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.

5. Method of Payment. Consultant shall submit billings to City describing in detail the work performed for which payment is requested, the date the services were performed, the number of hours spent and by whom, and a description of any reimbursable expenditures. Billings shall be submitted monthly, or at such other time as agreed upon between City and Consultant. City shall pay Consultant no later than 30 days after approval of the invoice by City staff.

6. Maintenance and Inspection of Records. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, time cards, and other records or documents relating to charges for services or expenditures charged to City, for a Attachment 5
28 285
I.

Rev. 1/26/99 -2-
minimum of three (3) years from the date of final payment to Consultant under this Agreement and shall make the same available to City or its authorized representatives for inspection and audit, at any time during regular business hours, upon written request by City. The right of inspection shall include the right to make extracts and copies.

7. Assignment and Subcontracts. Consultant acknowledges that Consultant's special skill and expertise is a material consideration for City entering into this Agreement.

Consultant shall not assign, subcontract or delegate to any other party the performance of any services to be rendered by Consultant under this Agreement without the prior written approval of City. If City consents to any subcontracting of work, Consultant shall be fully responsible to City for all acts or omissions of the subcontractor.

8. Ownership of Documents. All plans, studies, documents and other writings prepared by and for Consultant in the course of performing its services under this Agreement, except working notes and internal documents, shall become the property of City upon payment to Consultant for such work, and City shall have the sole right to use such materials in its discretion without further compensation to Consultant or to any other party.

Consultant shall, at Consultant's expense, provide such reports, plans, studies, documents and other writings to City upon written request.

9. Independent Contractor. Consultant is, and at all times shall remain, an independent contractor, and not an agent, officer or employee of City. As such independent contractor, neither Consultant nor any of its agents or employees shall be entitled to any salary, fringe benefits, worker's compensation, retirement contributions, sick leave, insurance or other benefit or right connected with employment by City, or any compensation other than as provided in this Agreement. Consultant shall have no power or authority to bind City to any contract or otherwise to incur any obligation or liability for, or on behalf, or in the name of City.

10. Licenses. Consultant represents and warrants to City that it has all licenses, permits, qualifications, insurance and approvals of whatsoever nature that are legally required of Consultant to practice its profession. Consultant shall, at its sole cost and expense, keep and maintain such licenses, permits, qualifications, insurance and approvals in full force and effect at all times during the term of this Agreement. Consultant shall maintain a City of Brisbane business license.

11. Compliance with Laws. Consultant shall use the standard of care in its profession to comply with all applicable federal, state and local laws, codes, ordinances and regulations in connection with the performance of its services under this Agreement.

12. Indemnity. Consultant shall indemnify, defend, and hold City, its officers, officials, agents, employees and volunteers, harmless from and against any and all claims, demands, causes of action, losses, damages, injuries, expenses and liabilities, direct or indirect, including attorney's fees, arising out of or in any manner relating to the performance by Consultant of its services under this Agreement or its failure to comply with any of the its obligations contained in this Agreement, and City shall not be liable for any acts or omissions of Consultant.
29 286
I.

Rev. 1/26/99 -3-

13. Insurance. Consultant, at its own expense, shall procure and maintain, for the duration of this Agreement, insurance policies which satisfy the following requirements:
(a) Type of policies and coverage:
(1) Commercial General Liability Coverage. Consultant shall maintain commercial general liability insurance in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, and $2,000,000 products and completed operations aggregate for bodily injury, personal injury and property damage, providing coverage at least as broad as Insurance Services Office Commercial General Liability form CG 00 01.

The policy shall include a per project or per location general aggregate endorsement. If a per project/location endorsement is not available, the limit for the general aggregate shall be doubled.
(2) Automobile Liability Coverage. Consultant shall maintain business automobile liability insurance in an amount not less than $1,000,000 each accident combined single limit for bodily injury and property damage, providing coverage at least as broad as Insurance Services Office form CA 00 01 Code 1 (any auto).
(3) Workers' Compensation and Employer's Liability Coverage. Consultant shall maintain workers' compensation insurance as required by the State of California and employer's liability insurance in an amount not less than $1,000,000 each accident, $1,000,000 by disease-policy limit, and $1,000,000 by disease-each employee for any and all persons employed directly or indirectly by Consultant in connection with the performance of services under this Agreement. In the alternative, Consultant may rely on a selfinsurance program to provide this coverage so long as the program of selfinsurance complies fully with the provisions of the California Labor Code.

The insurer, if insurance is provided, or Consultant, if a program of selfinsurance is provided, shall waive all rights of subrogation against City for loss arising from work performed by Consultant for City. (4) Professional Liability Coverage. Consultant shall maintain professional liability insurance that insures against professional errors and omissions in an amount not less than $1,000,000 per claim and in the aggregate, covering negligent acts, errors or omissions which may be committed by Consultant in the performance of its services under this Agreement. (b) Endorsements: Each general liability and automobile liability insurance policy shall contain and be endorsed to contain, the following provisions:
(1) The City, its officers, officials, employees, agents, and volunteers are to be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of Consultant; on Insurance Services Office form CG 20 10 (or equivalent) for ongoing operations, and on Insurance Services Office form CG 20 37 (or equivalent) for products and completed operations of Consultant; premises owned, occupied or used by Consultant; or 30 287
I.

Rev. 1/26/99 -4-
automobiles owned, leased, hired or borrowed by Consultant. The coverage shall contain no special limitations on the scope of protection afforded to City, its officers, officials, employees, agents or volunteers. (2) For any claims related to the Project, Consultant's insurance coverage shall allow and be endorsed primary insurance as respects the City, its officers, officials, employees, agents and volunteers. Any insurance or self-insurance maintained by City, its officers, officials, employees, agents or volunteers shall be excess of Consultant's insurance and shall not contribute with it. (3) The commercial general liability, automobile liability and workers’ compensation policies shall allow and be endorsed to include a waiver of subrogation in favor of the City, its officers, officials, employees, agents, and volunteers.
(4) Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to City, its officers, officials, employees, agents or volunteers. (5) Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.
(6) Consultant's insurance coverage shall not be suspended, voided, canceled or reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to City. If a carrier will not provide the required notice, the Consultant shall provide written notice to the City no later than five (5) business days before policy modification or cancellation.
(c) Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by City. At City's option, Consultant shall demonstrate financial capability for payment of such deductibles or selfinsured retentions. (d) Acceptability of Insurers. Insurance is to be placed with insurers having a current A.M. Best rating of no less than A:VII, unless otherwise approved by City in writing.
(e) Verification of coverage. Consultant shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required by this Agreement. Certificates of such insurance and endorsements shall be filed with City before commencement of work by Consultant. At the request of City, Consultant shall provide complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by this Agreement.
31 288
I.

Rev. 1/26/99 -5-

14. Notices. Any notices required or permitted to be given under this Agreement shall be in writing and shall be either personally delivered or sent by certified mail, return receipt requested, addressed to the other party as follows:

To City City of Brisbane
Attn.: Public Works Director
50 Park Lane
Brisbane, CA 94005
To Consultant Anchor QEA, LLAC
33 New Montgomery Street, Ste 1210
San Francisco, CA 94105

15. Litigation Expenses and Attorneys' Fees. If either party to this Agreement commences any legal action against the other party to enforce or interpret this Agreement, each party shall bear its own costs and expenses, including attorneys' fees, court costs, expert witness fees, and discovery expenses, incurred in connection with the legal action, regardless of which party may be deemed a prevailing party.

16. Termination of Agreement. This Agreement may be terminated by either party, effective upon written notice, should the other party commit any material default in the performance of its obligations hereunder. This Agreement may also be terminated by either party, for any reason, upon fifteen (15) day's prior written notice to the other party. In the event this Agreement is terminated by City through no fault of Consultant, Consultant shall be compensated for all services performed to the date of termination.

17. Equal Opportunity Employment. Consultant warrants that it is an Equal Opportunity Employer and shall comply with applicable regulations governing equal opportunity employment.

18. Miscellaneous Provisions.
(a) Severability. Should any portion of this Agreement be declared void or unenforceable in a final decision by a court of competent jurisdiction, such decision shall not affect the validity of the remainder of this Agreement, which shall continue in full force and effect, provided that the remainder of this Agreement can be reasonably interpreted to implement the intention of the parties.
(b) Entire Agreement. This Agreement constitutes the entire agreement between the parties and supersedes and cancels all prior agreements or understandings, whether written or verbal.
(c) Amendments. This Agreement may be modified or amended only by a written document duly executed by both City and Consultant.
(d) Waiver. The waiver of any breach or default under this Agreement shall not constitute a continuing waiver of a subsequent breach of the same provision or any other provision of this Agreement.
32 289
I.

Rev. 1/26/99 -6-
(e) Execution. Each party warrants that the individuals signing this Agreement on its behalf have the legal power and authority to do so and to bind the party to this Agreement.
(f) Successors and Assigns. Subject to the restriction against assignment and subcontracting, this Agreement shall be inure to the benefit of and shall be binding upon the heirs, personal representatives, successors and assigns of the parties hereto.

IN WITNESS WHEREOF, the parties have executed this Agreement the day and year first above written.

THE CITY OF BRISBANE
By: ____________________________
Mayor
ATTEST:
_____________________________
City Clerk
APPROVED AS TO FORM:
_____________________________
City Attorney
CONSULTANT:
________________________________
33 290
I.

Rev. 1/26/99 -7-

EXHIBIT A
Description of Services
34 291
I.

Rev. 1/26/99 -8-

EXHIBIT B
Time Schedule for Performance of Services
35 292
I.

Rev. 1/26/99 -9-

EXHIBIT C
Compensation
36 293
I.

File Attachments for Item:

K. Review Countywide Assignments and Council Subcommittees for 2026 294
DRAFT
2026

CITY OF BRISBANE - CITY COUNCIL ASSIGNMENTS
The following is a list of Commissions, Subcommittees, Boards, Councils and Associations for which the Council selects a representative(s).

County/Other JPA Assignments Representative/Alternate Mtg Sched.

Airport Community Roundtable Terry O’Connell 1st Wed/mo http://sforoundtable.org Madison Davis, Alt 7 pm
Airport Land Use Committee Terry O’Connell, Rep.
http://ccag.ca.gov/committees/ Cliff Lentz, Alt
Association of Bay Area Governments Mayor/Mayor Pro Tem http://www.abag.ca.gov/
Brisbane Baylands Community Madison Davis
Advisory Group (BBCAG) Terry O’Connell
Brisbane Emergency Services Council Cliff Lentz, Rep
(Mayor & SMC Emergency Services Council Rep) Terry O’Connell Caltrain Local Policy Makers Group Frank Kern
www.caltrain.com/calmod Cliff Lentz, Alt
City/County Association of Governments Coleen Mackin, Rep http://ccag.ca.gov/committees/board-of-directors/ Cliff Lentz, Alt.

County Library JPA Frank Kern
Liaison with Friends of Brisbane Library Cliff Lentz, Alt http://www.smcl.org/en/node/11
Housing Endowment & Regional Trust (HEART) Cliff Lentz
of SMC’s Committee Frank Kern
League of California Cities Mayor/Mayor Pro Tem
http://www.cacities.org
North County Fire Authority Board Madison Davis
of Directors/Fire Services (JPA Board) Terry O’Connell
Peninsula Clean Energy JPA Coleen Mackin
www.peninsulacleanenergy.com Madison Davis, Alt
Peninsula Traffic Congestion Relief Alliance Cliff Lentz http://commute.org/ Frank Kern, Alt
San Mateo County Emergency Mayor
Services Council Mayor Pro-tem
4 th Thurs/mo
4-6 pm
Annually/April
As Needed
7-9 pm
4 th Thursday every
other month 5:30
2 nd Thurs/mo
6:30-9:30pm
2 nd Mon/bi-month
8:15 am
Annually (May)
Conferences
Once a year
in June/July
4 th Thurs/mo
7-9 pm
3 rd Thurs/bi-month
8 – 9:30 am
3 rd Thurs/mo/Quart
5:30 pm
Updated 12/31/2025
http://hsd.smcsheriff.com/
295
K.

Updated 12/31/2025
SMC Pre-Hospital EMS Group Frank Kern 3rd Wed Jan/May/Sept Board of Directors (JPA-ALS Paramedic) Terry O’Connell, Alt 6 pm City Council Subcommittees Representative/Alternate
Age Friendly Subcommittee Frank Kern
(created Nov 2021) Cliff Lentz
Baylands Cliff Lentz
(All things Baylands, BSP - UPC application and is Terry O’Connell various studies, i.e., financial, survey, sustainability, + 1 PC, + 1 CSSC, +1 P&R HSR, Soil Processing, Recology) + 1 OSEC, + 1 PAAC
Beautification on City Owned Property Frank Kern
Subcommittee (created Jan 2025) Madison Davis
+ 1 P&R , + 1 OSEC, + 1 CSSC
City Facilities Subcommittee Madison Davis
(created Jan 2025) Coleen Mackin
Communication, Outreach & Engagement Frank Kern
Subcommittee Coleen Mackin (+ Caroline)
Crocker Park Subcommittee Cliff Lentz
Coleen Mackin
Economic Development Subcommittee Frank Kern
Cliff Lentz (+ Mitch)
Emergency Preparedness Subcommittee Madison Davis
(created Jan 2025) Frank Kern
Fiscal Policies Subcommittee Coleen Mackin
(Review of Fiscal policies, such as OPEB, Terry O’Connell Fund Balances Policies, unfunded liabilities)
History Subcommittee Madison Davis
Coleen Mackin
Housing Subcommittee Madison Davis
Cliff Lentz
Infrastructure, Utilities & Franchise Subcommittee Cliff Lentz (Water & Sewer, rates & plans, Franchise agreements, Terry O’Connell Infrastructure plans, Storm drains, streets, marina)
Planning Issues Subcommittee Frank Kern
Coleen Mackin
296
K.

Updated 12/31/2025
Madison Davis
Terry O’Connell
+ 2 P&R, + 1 Business owner
+ 1 Artist, + 1 Community member
Cliff Lentz
Terry O’Connell
Madison Davis
Cliff Lentz
Cliff Lentz
Coleen Mackin
Cliff Lentz
Terry O’Connell
Frank Kern
Cliff Lentz
+ 1 P&R, + 1 OSEC, + 1 PAAC
Representative/Alternate
Public Art Advisory Committee &
Public Art Selection Committee
Quarry Subcommittee
(created Jan 2025)
School/City Subcommittee 2x2
Sea Level Rise Subcommittee
(created Jan 2025)
Sierra Point Parkway & Marina Subcommittee
Sierra Point Parkway Park & Open Space
(For parks and open space projects at SPP)
(Created 1/7/21)
Ad hoc Subcommittees
City Attorney Recruitment Ad hoc
Elections Issues Ad hoc
(created Feb 2024)
Succession Planning Ad hoc
(Support CM as staff retire) created Jan 2025
Parkside II Ad Hoc
Council Liaisons
Cliff Lentz
Terry O’Connell
Madison Davis
Cliff Lentz
Madison Davis
Frank Kern
Cliff Lentz
Coleen Mackin
Representative/Alternate
** Meet with two representatives from each Commission for Liaison meetings: involves discussion around the Commission’s achievements, goals and their upcoming workplan.

Liaison to Complete Streets Safety Committee Frank Kern Coleen Mackin
Liaison to Inclusion, Diversity Equity & Accountability (IDEA) Madison Davis Liaison to Open Space & Ecology Committee
Liaison to Parks & Recreation Commission
Liaison to Planning Commission
Cliff Lentz
Coleen Mackin
Terry O’Connell
Madison Davis
Frank Kern
Cliff Lentz
Coleen Mackin
297
K.

File Attachments for Item:

L. Countywide Assignments and Subcommittee Reports
i. Parkside 2 Ad Hoc Subcommittee Update
ii. Report Out on Subcommittee Meetings
iii. Upcoming Subcommittee Meetings
298
CITY of BRISBANE
Council Subcommittee Update
From December 6th, 2025, to January 9th, 2026

1. Report Out on Subcommittees/Committees
A. Liaison to Park & Recreation Commission Subcommittee 12/8 Davis, Kern, P&R Chair T. Davis, P&R Vice-Chair Seawell
The liaisons discussed the commission’s goals for the year and reviewing City facilities. Two main concerns for the commissioners are the kitchen at Mission Blue and the Community Center building.

Councilmembers are aware and share the same sentiment; however, the council is waiting on potential impact fees to assist with these repairs. There is also a $900K projected deficit that the City needs to manage. Specific to the community center, some of the Redwood trees will need to be removed and the ADA requirements will need to be brought into compliance by adding an elevator. Public Works Director has potential alternatives that he is exploring. The Park and Recreation department has also created a Park & Rec foundation that will work in unison with the department and commission to develop a volunteer group and create a fundraising mechanism that could benefit these projects in the future.

Next steps #1:

Facilities Subcommittee is scheduled to review all city properties in Q2.

Next steps #2:

Park and Recreation Director Leek will compile the department’s project “dream list”.

The commissioners also talked about other projects they are exploring, including: adding elements along the Crocker Trail, trail adoption and ambassadors and a trash pick-up volunteer program; Age Friendly initiatives, such as benches and workshops; new fitness equipment at Sierra Point Parkway; Youth Volunteer of the Year honors; and frog habitat stewardship support. They also mentioned that the bicentennial walkway will have its 50th anniversary in July 2026, which also happens to be Park and Rec Month and would benefit from volunteer fundraising for repairs. Councilmembers Davis and Kern would like the Park & Rec Commission to think about what they envision in the Baylands and consider having a Volunteer Spotlight in the Brisbane Star showing before and after highlights of projects.

Additional step #3:

Park and Recreation Chair and Vice-Chair will be invited to future Sierra Point Parkway Parks & Open Space Subcommittee to hear about City owned property (Parcel R) in the Brisbane Marina that the City owns and would like to utilize for public space in some way.

To view the meeting, please visit:
https://www.brisbaneca.org/citycouncil/meeting/liaison-park-recreation-subcommittee 299
L.

B. Housing Subcommittee 12/15 Davis, Kern (Alt)
The Housing Endowment and Regional Trust (HEART) of San Mateo County discussed their response to the City’s Request for Proposal regarding ownership and management of Visitacion Senior Housing.

HEART was represented by Audrey Washington and Armando Sanchez. HEART originally was a lender, but they have now began specializing in renting out small developments (8–20-unit range). HEART would assume the debt and restructure the loan if needed. They project that it will be about 10 years when units will turn over and rent to debt ratio would equalize. They discussed how the waitlist would be managed, expectations of property management, and continued annual reporting to the City.

HEART will begin their due diligence regarding the property such as appraisal and repairs.

Next steps #1: HEART will send loan documents to staff for legal review in January.

Next steps #2: This is targeted to be brought to Council on February 5th.

To view the meeting page, please visit:
https://www.brisbaneca.org/citycouncil/meeting/housing-subcommittee-meeting-1 C. Fiscal Policy Subcommittee 12/16 Mackin, O’Connell
Finance Director Yuen gave the subcommittee a progress update on the Business License Fee study by analyzing the current tax registry, conducting a fee analysis and comparative study and reviewing modified tax structure options. The study includes comparisons of similar type cities to Brisbane, polling of businesses and their input on ballot language, structure changes for certain industries, and considerations between smaller and larger businesses. The subcommittee wants the ballot language for the voters to speak to quality-of-life issues to inform ballot initiatives.

Finance Director Yuen and representatives from Matrix Consulting then reviewed the Master Fee Study Results with the subcommittee. The general purpose of the study was to document the direct and indirect costs associated with fee-based city services. The study would also identify services currently provided for which fees could be assessed and understand how services and fees compare within the region. The Study recommends/suggests updates to the Master Fee Schedule, for example: There were several areas that were determined that departments could charge more in relation to the cost of service; Although many of the current fees are reflected as much less than the cost to provide the service, some departments have elected not to charge enough to cover the full cost, primarily due to competitive pricing to neighboring jurisdictions; The proposed Master Fee Schedule has been reorganized for clarity and ease of reference; There were several fees that were higher than service cost or higher than regulation and needed to be reduced; The City should continue to use CPI for annual adjustment determinations.

Within the study, it also reflects the feedback from each department and whether they support the recommendation. The subcommittee asked for more narrative for each line increase and also recommended that an application fee for a marina slip and the actual certification/verification fee be separated instead of the current single fee. When this comes to council, there needs to be a large discussion around Park and Recreation fees. They support the idea of subsidizing childcare, seniors and pool activities, but not for facility rentals.
300
L.

It is recommended that if the fees are adopted, there is a phased in approach. Matrix Consulting also recommend reviewing the Master Fee Schedule every 5-7 years.

Next steps #1: Come back to the subcommittee with the suggested changes and updates completed and then go to council on February 5th.

To view the meeting page, please visit:
https://www.brisbaneca.org/citycouncil/meeting/fiscal-policy-subcommittee-meeting D. Emergency Preparation Subcommittee 12/16 Davis, Kern The City received notice from CalOES that our Local Hazard Mitigation Plan (LHMP) was expiring in December 2026. The County of San Mateo is taking the lead in coordinating a comprehensive LHMP for all San Mateo County cities. As a stakeholder, the City has assembled a planning team consisting of the City Manager’s Office, Public Works, Planning, Police, and Fire to participate in the County’s workshop.

The subcommittee discussed the outreach plan, especially those not on social media such as some older seniors, and work with current groups in town for feedback and information. The group brainstormed emergency refrigeration for medications, portable generators (Mission Blue equipped?) and continue to work with the City’s businesses for resources. Staff will continue to work on getting residents signed up for SMC Alert. It is recommended that when the annual EOC exercise is scheduled, that the office be closed so all staff participate.

Next steps #1: County workshop will be attended in February.

To view the meeting page, please visit:
https://www.brisbaneca.org/citycouncil/meeting/emergency-preparedness-subcommittee-meeting-0 E. Sierra Point Pkwy Parks & Open Space Subcommittee 1/7/26 Kern, Lentz, P&R Chair T. Davis, P&R Vice-Chair Seawell
The subcommittee focused on updating the Park and Recreation Commission Chair and Vice-Chair on the progress and next steps for City owned property Parcel R at Sierra Point Parkway. They discussed the current status of the project, including community feedback, environmental considerations, and funding for a potential first phase at Parcel R. They emphasized the importance of collaboration to develop recommendations for a park that enhances open space and public amenities. The Park and Recreation Chair and Vice-Chair will work to create a solid proposal for the council to adopt.

To view the meeting page, please visit:
https://www.brisbaneca.org/citycouncil/meeting/sierra-point-parks-open-space-subcommittee-0

2. Upcoming Subcommittees:

Fiscal Policy Subcommittee 1/20 1:30pm Mackin, O’Connell Economic Vitality Subcommittee 1/22 2:00pm Kern, Lentz 301 L.

Public Art Advisory Committee 1/26 5:15pm Davis, O’Connell Quarry Subcommittee 1/29 10:30am Lentz, O’Connell

3. Proposed Subcommittees:

Does any councilmember wish to propose any items for a subcommittee to discuss? 302