Council Member Comment / Question Response By Response
Cliff Lentz Alternative 7 reduces development and
building heights. Did the EIR quantify GHG
emissions for the alternatives, including the
reduced-development alternative?
Staff Team Yes. The EIR includes a quantified GHG analysis prepared by ESA and compares project emissions with emissions expected under the alternatives.
Cliff Lentz How is approximately 2.5 million cubic yards of soil expected to move from the east side
to the west side: conveyor or trucks?
BDI Both methods were studied in the EIR. BDI's preference is to avoid public streets and move soil across the Caltrain tracks, but the method remains subject to ongoing coordination with Caltrain.
Cliff Lentz If trucks are used to move soil, were those truck trips included in the air-quality
analysis?
Staff Team Yes. The construction analysis assumed on-road diesel trucks moving the full 2.5 million cubic yards from east to west. That activity contributed to AQ-1 being significant and unavoidable and is addressed by Mitigation Measure AQ-1f.
Cliff Lentz /
Madison Davis
How much truck activity could soil
movement generate if trucks are used?
Staff Team The analysis identified peak activity of approximately 640 round trips per day during the soil-movement period. Based on 2.5 million cubic yards and approximately 20 cubic yards per truck, the discussion identified roughly 125,000 one-way loads/trips.
Terry O'Connell Did the air-quality analysis assume soil is moved only once? Will some soil have to be
moved more than once to complete the east-side landfill closure and grading? Staff Team
BDI (BKF)
The EIR analysis assumed the 2.5 million cubic yards is moved once from east to west. BKF clarified that soil remaining on the east side will be moved within the east side as part of the Title 27 closure and pad grading, but soil moved west would not be moved back east and no additional soil import is anticipated for that process.
Cliff Lentz Can the Specific Plan require electric trucks rather than diesel trucks for soil movement?
Staff Team Staff indicated such a requirement would need to account for feasibility and commercial availability. Mitigation Measure AQ-1f already requires the best available control technology and lowest-emitting commercially available equipment at the time of construction, which could include zero-emission trucks, an electric conveyor, or a combination.
Madison Davis /
Cliff Lentz
Because AQ-1f is an EIR mitigation
measure, is that sufficient, or should the
lowest-emitting truck requirement also be
repeated in the Specific Plan so it is easier
for the public to find?
Staff Team If the EIR is certified and the mitigation monitoring and reporting program adopted, the mitigation measure becomes a project requirement. Council discussed whether this particular requirement should also be repeated in the Specific Plan.
Baylands Specific Plan | City Council Hearing Comments and Responses
Council Member Comment / Question Response By Response
Cliff Lentz Should Council evaluate GHG emissions
using a Specific Plan-area/site perspective
rather than, or in addition to, the regional
'whether here or there' approach?
Staff Team Staff explained that the City has discretion to select supported thresholds; GHG is generally analyzed as a regional/global impact, and the Final EIR uses a regional threshold for the applicable impact.
Staff also noted that GHG-3 evaluates project features and emissions at the project site using project-specific thresholds. Lentz requested that the regional-versus-site approach return for Council deliberation.
Cliff Lentz When would the solar field be delivered
relative to west-side development?
BDI BDI described the solar field as occurring near the end of the first phase / during the transition from west-side development to east-side development, after the necessary soil movement and landfill work. It is not a day-one improvement.
Frank Kern What changed between the earlier
conclusion that the project would not be
energy neutral and the later conclusion that
grid-supplied renewable energy could
support a consistency finding?
Staff Team Staff said the option to use grid-supplied renewable energy was always available. What changed was the context and methodology used to evaluate the policies, including additional analysis prepared in response to Planning Commission questions about Measure JJ consistency.
Madison Davis Which pollutants drive the AQ-1 significant and unavoidable conclusion, and how do
construction impacts compare with
operational impacts?
Staff Team After mitigation, ROG, NOx, PM10 and PM2.5 exceed the applicable thresholds when construction, operations and overlapping activity are considered. For construction alone, NOx is the pollutant that exceeds the threshold; for operations alone, all four exceed. Operational ROG and particulate emissions are substantially higher than construction emissions, while NOx is of a similar order.
Terry O'Connell Is using a regional GHG framework rather than a site-specific framework legally
required, or is it a discretionary analytical
choice by the City?
Staff Team The City has discretion to define thresholds if supported by evidence.
Staff explained that GHG emissions are regional/global impacts and that state guidance informed the regional approach, but ultimately the threshold choice is a City decision.
Terry O'Connell How long were significant construction
emissions evaluated, and how were health
effects on residents living near ongoing
construction addressed?
Staff Team AQ-1 evaluated construction from 2026 through 2033, as well as operational phases and full buildout. Potential exposure of on-site and off-site residents to localized construction and operational emissions was evaluated separately in the EIR as a health-risk impact with its own threshold and mitigation.
Cliff Lentz Who prepared the air-quality study? Staff Team ESA prepared the air-quality analysis.
Cliff Lentz Evaluate the GHG emissions performance of
Alternative 7 and compare it to the Project
Staff responded to a similar question at this hearing (see Council Member Lentz's question on Alternative 7 above).
Baylands Specific Plan | City Council Hearing Comments and Responses
Public Comments
Speaker Comment / Question Response By Response
Paul Bescal Commented that a conveyor may still require truck activity and urged keeping soil-hauling
trucks off local streets because of dust and
diesel emissions; suggested an over-track
solution.
Staff Team Staff noted that a separate remediation hearing will address soil handling/remediation in more detail.
Anthony Walker Questioned how the EIR can conclude the
GHG impact is less than significant when the
Baylands would add substantial project
emissions; expressed concern that removal
of the outcome-based offset mitigation
leaves no mechanism tied to actual project
emissions or corrective action.
Comment noted; no response requested.
Michele Salmon Raised concerns about dust controls, regular soil testing, covered trucks and a covered
conveyor, and urged stronger requirements
rather than relying solely on regulatory
agencies.
Staff Team Staff stated that EIR dust-control requirements apply and that trucks would be covered; the conveyor would also be covered.
Dana Dillworth Asked whether existing emissions from the landfill and Kinder Morgan were included in
the GHG calculations.
Staff Team Staff indicated those existing sources are part of baseline conditions; the project analysis evaluates new emissions associated with the project.
Karen
Cunningham
Raised concern about asbestos and mercury
in soil becoming airborne during soil
movement and construction.
Staff Team Staff indicated mercury/remediation issues would be addressed during the remediation hearing.
Land Use Plan & Design Topics
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Coleen Mackin Can the Council legally remove the High-Speed Rail Light Maintenance Facility reservation from the Specific Plan?
Staff Team Staff stated that Council has discretion to adopt the plan with or without the LMF reservation; both configurations were studied in the EIR.
Baylands Specific Plan | City Council Hearing Comments and Responses
Council Member Comment / Question Response By Response
Madison Davis What interim uses could occur in the LMF
area while environmental cleanup and future
development advance?
BDI BDI described existing/interim uses such as outdoor storage and vehicle/parking storage and discussed uses that could support the landowner's environmental and development work.
Frank Kern If Council retains the LMF reservation now,
can the Specific Plan later be amended to
remove it? What options does Council have?
Staff Team Council may adopt the Specific Plan with or without the LMF. If adopted with the LMF, the Plan could later be amended to remove it.
Both options were studied in the EIR.
Frank Kern Could the Specific Plan retain the LMF
reservation but include an expiration date?
Staff Team Staff indicated an expiration mechanism could potentially be built into the Specific Plan.
Frank Kern How will development and soil movement
occur around existing uses that remain on
the Baylands?
Staff Team Staff confirmed that existing uses may remain while surrounding Baylands work proceeds; the detailed interface with existing uses will require implementation coordination.
Terry O'Connell If the LMF is removed, what land-use and design controls would apply to the area,
including controls on noise, lighting and
future uses?
Council discussed the City's future review tools and the implications of removing the LMF reservation, but the response was not fully resolved during the hearing.
Cliff Lentz Can BDI provide renderings showing how
the proposed heights and housing types
would look together, including towers in
relation to the Roundhouse and lower-scale
residential development?
BDI BDI and the design team acknowledged the request. Council asked for additional visualizations to help the public understand the proposed scale and mix of development.
Cliff Lentz Is Baylands Boulevard intended to be a
mixed-use shopping street with residential
as well as retail?
Staff Team
BDI
Yes. BDI clarified that the area is planned as mixed use with both residential and retail components.
Cliff Lentz Could residential development be extended
south of Main Street, or would doing so
require a change to Measure JJ / voter
approval?
Staff Team Council discussed the Measure JJ boundary and requested clarification regarding whether residential south of Main Street could be considered. The issue was not resolved during the hearing.
Public Comments
Speaker Comment / Question Response By Response
Melissa Foley Provided comments on Baylands open
space / estuary issues and prior input
provided to BDI.
Comment noted; no response requested.
Baylands Specific Plan | City Council Hearing Comments and Responses
Speaker Comment / Question Response By Response
Paul Bescal Raised concerns regarding Visitacion Creek
and its potential effect on development,
including how density or development
capacity may respond to constraints.
Comment noted; no response requested.
Allie Saberman Urged the City Council to certify the EIR. Comment noted; no response requested.
Michele Salmon Raised concern that lead deposition along Bayshore Boulevard and Highway 101 has
not been adequately studied, particularly in
relation to a potential school site; supported
conservation easements and lower building
heights.
Staff Team No complete response was provided during the hearing; remediation and environmental issues continue to be addressed in the hearing process.
Linda Salmon Supported allowing housing on the Baylands but raised concerns about placing residents
on contaminated land; urged a flexible plan
and argued that environmental issues
should be resolved before approvals
proceed.
Comment noted; no response requested.
Roland Suggested Giken silent piling as an
alternative construction technology and
advocated removing the high-speed rail
maintenance facility from Brisbane, disputing
the EIR's rejection of an alternative location.
Comment noted; no response requested.
Objective Standards and Design Guidelines
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis What design authority will the City retain when individual development proposals
come forward?
Staff Team Future buildings are not approved by the Specific Plan itself. Projects remain subject to City review under the Specific Plan's standards and applicable review processes. Council emphasized retaining meaningful design oversight.
Baylands Specific Plan | City Council Hearing Comments and Responses
Council Member Comment / Question Response By Response
Madison Davis Are the Chapter 3 design standards
complete and fixed, or can the City refine or
add standards later?
Staff Team The standards are intended to be comprehensive, but the City may amend the Specific Plan and adopt/refine standards in the future.
Housing review is more constrained by objective-design-standard requirements than commercial review.
Madison Davis Can the City retain or hire third-party design professionals to review future Baylands
proposals?
Staff Team Yes. Staff indicated the City can use third-party design expertise in future review.
Madison Davis Does the Specific Plan expressly state that the City retains design review authority over
future buildings? Council wants to ensure
the City retains full design control to the
extent legally available.
Staff Team Staff clarified that the Specific Plan functions more like a regulatory code and does not itself approve individual buildings. Staff agreed to review the language in response to Council's concern.
Cliff Lentz Should the City conduct additional design
engagement or use outside design
organizations/experts so future Baylands
buildings and neighborhoods reflect
Brisbane's character and are inviting and
cohesive?
Staff Team
BDI
The design team explained that the standards were developed to be feasible and flexible and drew from prior engagement, but additional precedent work and community engagement could further define what is authentic to Brisbane. Council expressed interest in continued public design engagement.
Schools / Community Facilities
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Frank Kern Are the potential middle-school sites
identified in the Roundhouse area large
enough for a middle school?
Staff Team Staff said it would follow up. The Specific Plan identifies potential school locations, but the hearing did not resolve the acreage/site-program question.
Cliff Lentz How will the Baylands school-district
boundary issue be addressed, and will BDI
actively participate in discussions about
placing Baylands students within one school
district?
BDI BDI said the landowner had previously requested a boundary change and is willing to participate in a collaborative discussion. Any boundary change would require action by the applicable school district(s).
Baylands Specific Plan | City Council Hearing Comments and Responses
Council Member Comment / Question Response By Response
Madison Davis Should BDI and the City convene
representatives of both school districts and
Council members to advance the school-boundary discussion rather than leaving it as a general future conversation?
BDI BDI agreed the topic warrants further discussion outside the hearing forum.
Noise / Building Construction
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Coleen Mackin Mitigation Measure NOI-1 limits pile driving where geological conditions permit. When is
pile driving actually necessary, and which
parts of the site have geological conditions
that would require or allow it?
Staff Team Staff said it would return with additional information.
Roundhouse / Objective Standards and Design Guidelines
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Why does the architectural-compatibility
requirement around the historic Roundhouse
extend only 50 feet? Should the compatible-design area be broader? BDI The 50-foot distance comes from the EIR mitigation measure addressing visual effects on the historic resources. The design team noted that Chapter 2 and Chapter 3 also include inspiration imagery and other design direction.
Open Space and Amenities
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Can Mission Blue Nursery remain in its
current location?
Staff Team
BDI
The Planning Commission recommended retaining Mission Blue Nursery in its current location, and Council expressed support for the nursery.
Baylands Specific Plan | City Council Hearing Comments and Responses
Council Member Comment / Question Response By Response
Cliff Lentz Can Icehouse Hill retain elements of
Brisbane's rural character, including
concepts such as an urban farm or stables?
Council raised the concept for consideration; no final direction or detailed response was reached during this portion of the hearing.
Cliff Lentz / Frank
Kern / Madison
Davis
Should the Specific Plan more intentionally
plan for childcare, rather than merely
allowing childcare as a use?
Staff Team Council members expressed support for addressing childcare in the Specific Plan, including the recommendation to add a childcare goal to Section 2.2.
Cliff Lentz Why are the community ballfields located
where shown rather than adjacent to the
potential school site?
BDI BDI said the location reflects prior outreach, including community interest in locating the ballfields closer to central Brisbane and the Crocker area.
Public Comments
Speaker Comment / Question Response By Response
Ariel (San Bruno
Mountain Watch /
Mission Blue
Nursery)
Supported retaining Mission Blue Nursery in
its current location and emphasized its role
in habitat restoration, locally native plant
propagation, community use, and the
mountain-to-bay ecological connection.
Comment noted; no response requested.
Eileen McLaughlin Supported conservation easements and
stronger habitat-sensitive lighting controls,
including shielding/timing to prevent spill into
sensitive habitat and a warm 2700K
standard rather than using full-moon
brightness as a daily benchmark.
Comment noted; no response requested.
Dao Jane Pei /
Build Up San
Mateo County
Requested that childcare be intentionally
planned for in the Baylands land-use
framework, particularly near residential
neighborhoods and employment centers,
and supported adding a childcare goal to
Section 2.2.
Comment noted; no response requested.
Baylands Specific Plan | City Council Hearing Comments and Responses
Sea Level Rise
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Could a tidal gate be considered as part of the sea-level-rise strategy for Brisbane
Lagoon, including to help prevent lagoon
flooding onto adjacent properties?
Staff Team The design team noted that Highway 101 and other low-lying infrastructure create a broader shoreline challenge and that sensitive mudflats would need to be protected. Matt Brennan explained that the Specific Plan's north lagoon shoreline is relatively high and well suited to a nature-based horizontal-levee / gradual-slope adaptation approach, and that a tide gate is not necessary for that portion of the shoreline.
Coleen Mackin Sea-level-rise work outside the Specific Plan has identified a problem near the
bridge/railroad intersection at the northwest
lagoon shoreline that could affect Caltrain.
Should the Baylands team coordinate with
the consultants studying the full lagoon
shoreline so the approaches connect?
Staff Team Matt Brennan agreed that shoreline adaptation must account for transitions between parcels. He noted that the Tunnel
Avenue/railroad drainage area is outside the Specific Plan area and had not been reviewed by him in detail, but coordination between adjoining shoreline approaches is important.
Frank Kern How will sea-level rise and raised Baylands
grades affect existing-use areas such as
Recology, Golden State Lumber and Kinder
Morgan that are not being raised?
Staff Team Council flagged these lower existing-use areas as potential flooding interfaces. The discussion recognized that grades and adaptation measures must transition across parcel boundaries; detailed site-specific resolution was not completed at the hearing.
Remediation
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Council Member
(name not
recorded)
The east side has unregulated garbage and
waste. When soil is moved from east to
west, how does the contractor know when it
is hitting toxic waste? Should anything be
added to the Plan to address this?
Staff indicated these issues could be addressed during the remediation hearing.
Baylands Specific Plan | City Council Hearing Comments and Responses
Public Comments
Speaker Comment / Question Response By Response
Charles Spencer What is the direction of flow of contaminants underneath the cap and where are potential
accumulation points?
Does the cap create a situation where
pressure builds and can't be relieved the
way it normally would? If so, is there an
analysis on how that pressure is relieved?
Staff indicated these issues could be addressed during the remediation hearing.
Baylands Specific Plan | City Council Hearing Comments and Responses
Hearing 3: October 6, 2026
Land Use Plan & Design Topics
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Frank Kern How does the Specific Plan address off-street loading bays, staging areas, curb management, and tenant move-in/move-out
activity during monthly peak turnover periods
in high-density residential areas, rather than
only general deliveries?
Staff Team The Specific Plan includes standards for driveway and loading operations modeled in part on San Francisco practices, including reserving on-street loading space or demonstrating that loading can be accommodated on site, plus procedures for addressing complaints. These requirements are embedded in Chapter 6 and transportation-related design/mitigation materials.
Coleen Mackin Has BDI coordinated with San Francisco
Planning/SFMTA regarding the Bayshore
Caltrain Station Plaza and San Francisco's
Bayshore Multimodal Facility Study,
including its alternative concepts?
BDI BDI has had initial regional-infrastructure discussions with San Francisco Planning and SFMTA, but has not yet coordinated on the exact station-plaza design. BDI said coordination with relevant stakeholders will be required once a design is advanced. Council Member Mackin emphasized that this coordination is important to undertake in advance.
Coleen Mackin How will the required affordable housing be delivered in a timely manner if different
neighborhoods are built by multiple
developers over many years? Will affordable
units be prioritized, and when would the
larger Housing Element goal of 514
affordable units be completed?
Staff Team
BDI
BDI said the 15% inclusionary requirement would be delivered in phases, with each development phase including its affordable component, often through partnerships with nonprofit affordable-housing developers. BDI cautioned against requiring affordable units to be built first because nonprofit financing can take two to four years to assemble. Staff clarified that 2,200 units at 15% equals 330 inclusionary units; the 514 figure comes from the Housing Element and is a broader City goal.
Terry O'Connell Is affordable housing counted differently during Housing Element planning than when
units are actually built, with planning
assumptions based on density but actual
affordability determined by sales price or
rent?
Staff Team Yes. During Housing Element planning, affordability can be assumed based on the density for which land is planned. When development permits are issued and reported to HCD, actual sales prices or rents determine the income category of completed units.
Baylands Specific Plan | City Council Hearing Comments and Responses
Public Comments
Speaker Comment / Question Response By Response
Karen
Cunningham
Requested physical/3D models or similarly
understandable visualizations showing the
proposed Baylands, including the effect of fill
elevations, building heights, and the
Roundhouse, so residents can better
understand what the development would
look like from Brisbane and as the project
evolves.
Comment noted; no response requested.
Linda Salmon Commented that the hearing process and
timing of public comment were confusing
and that it is difficult for the public to
comment meaningfully before seeing the full
presentation and discussion on a topic.
Comment noted; no response requested.
Michele Salmon Raised concern about 22-story buildings, including whether fire equipment and fire-department capabilities are adequate for buildings of that height and whether
earthquake and fire risks have been
sufficiently considered.
Comment noted; no response requested.
Open Space and Amenities
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Requested a final accounting of the
approximately 157 acres identified as open
space/open area, separately showing
permanent habitat conservation, wetlands,
publicly accessible parkland, recreational
open space, and privately controlled open
area, preferably on a map with acreage
totals for each category.
Staff Team Staff noted that an existing Specific Plan figure provides some of this information. Council Member Davis clarified that she would like total acreages parsed by category, including combined totals for active recreation areas, to make the allocation clearer.
Baylands Specific Plan | City Council Hearing Comments and Responses
Council Member Comment / Question Response By Response
Madison Davis Does the Specific Plan preserve flexibility to change recreational or community amenities
over time as community needs change, and
what authority would the City have to require
a different amenity than one shown in an
illustrative plan?
Staff Team Future parks, open spaces, and trails would require site-specific improvement plans as development occurs. The Parks and
Recreation Commission has delegated review authority under the Specific Plan and would review those plans using the Plan's framework and policy direction.
Madison Davis Given the Baylands' environmental history and remediation/landfill-closure oversight by
other agencies, can the City secure
permanent public-access, maintenance, and
utility easements for infrastructure, parks,
and open space while leaving fee ownership
and responsibility for the landfill cap,
remediation, and future environmental
failures with the responsible property owner
or other legally responsible party?
Requested clearer Specific Plan language if
feasible.
Staff Team Yes. Publicly accessible open space can remain privately owned through easements/dedications and associated ownership, maintenance, and operating agreements. Staff said that, if Council directs, language could be brought forward making this approach more explicit or mandatory.
Public Comments
Speaker Comment / Question Response By Response
Michele Salmon Questioned the proposed location of the
community fields because the area
historically functioned as wetland, may
become wet again, and appears constrained
for parking by surrounding uses and
infrastructure.
Comment noted; no response requested.
Michael Barnes Opposed treating the existing Mission Blue Nursery location as necessarily fixed.
Suggested that the nursery could operate on
remediated land because plants are grown
on tables, while the limited clean land could
be reserved for more sensitive receptors or
uses that require direct soil contact.
Comment noted; no response requested.
Baylands Specific Plan | City Council Hearing Comments and Responses
Roundhouse / Objective Standards and Design Guidelines
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Coleen Mackin Is the Page & Turnbull Roundhouse
rehabilitation concept in the Specific Plan a
prescriptive blueprint or an illustrative idea,
who is expected to undertake the
renovation, and how would the restoration
and long-term operation be financed?
BDI BDI stated that the Page & Turnbull concept is a real adaptive-reuse plan and that the Roundhouse must be preserved. Financing is envisioned as a stack of private equity/funding, CFDs,
HOAs/commercial associations, and potentially public-art funds.
Revenue-producing uses such as shops, cafés, restaurants, theater/event uses, and other active uses are intended to help support long-term maintenance.
Madison Davis If Roundhouse programming changes over
time, does the Specific Plan require a
continuing public museum, educational,
cultural, historic-interpretation, or community
component so the public can appreciate the
Roundhouse even if portions are used for
restaurants, cafés, or events?
BDI The EIR requires future adaptive reuse to undergo design review and comply with the Secretary of the Interior's Standards, but Kathy Cleveland did not identify an explicit requirement for a historic-interpretation component. BDI said the Roundhouse is intended primarily as a public amenity/open-air amphitheater and park, with commercial uses as a smaller component, and agreed that educational signage or interpretation is appropriate.
Public Comments
Speaker Comment / Question Response By Response
Michele Salmon Raised concern about toxic contamination at the Roundhouse site and asked how
contamination would be remediated if the
Roundhouse remains at its existing
elevation/location rather than being raised or
relocated.
Council Member Mackin indicated that the remediation issue would likely be addressed under the remediation topic.
Baylands Specific Plan | City Council Hearing Comments and Responses
Sea Level Rise
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Does the Specific Plan require ongoing
groundwater monitoring or site-specific
groundwater baselines so the City can
detect whether actual groundwater
conditions differ from the assumptions used
in the EIR as sea level rises?
Staff Team The sea-level-rise/groundwater expert was not available. Staff committed to return to the question in connection with the remediation or phasing discussion.
Madison Davis For buildings or infrastructure constructed later in the multi-decade buildout, how does
the Specific Plan ensure that the applicable
future 100-year sea-level-rise projection is
reevaluated at the time of development
rather than relying only on today's 2100
assumptions?
Staff Team Staff stated that the infrastructure provisions require ongoing application of updated standards, particularly for sea-level rise and flood levels, so current standards would be applied as future development permits are processed.
Circulation / Street Sections
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Raised a fundamental concern with green
shared streets because pedestrians,
bicyclists, and vehicles would occupy the
same space in a dense mixed-use
neighborhood. Requested Council consider
removing the concept and using more
conventional separated facilities with clearly
defined space for vehicles, bicycles, and
pedestrians.
Comment noted; no response requested.
Baylands Specific Plan | City Council Hearing Comments and Responses
Council Member Comment / Question Response By Response
Frank Kern Shared concern about green shared streets
based on experience with Argyle Street in
Chicago. While the concept can work in a
commercial/retail setting, questioned how
well it would work in a residential
neighborhood with children, cars, bicycles,
and other mobility devices sharing space.
Comment noted; no response requested.
Cliff Lentz Requested examples of neighborhood-type
green shared streets and asked how bicycle
sharing would be implemented and whether
it is a required City TDM measure or a
developer strategy.
Staff Team
BDI
BDI said bike share is a key TDM strategy and could be implemented through an existing or new program, potentially with sponsorship.
Staff clarified that bike share/shared micromobility is identified in the Specific Plan as a physical TDM feature, but it is not one of the City's required TDM measures because there is no current countywide program; it is an optional project strategy used to help meet traffic-reduction targets.
Terry O'Connell The project video and Specific Plan appear to show Caltrain tracks at grade with the
development even though development
pads would be raised. How would that work,
and would the developer be responsible for
paying to change the Caltrain grade?
Staff Team Staff said the issue requires further review and could be addressed as part of the phasing discussion.
Coleen Mackin Raised concern that green shared streets
may not function safely with deliveries,
double parking, loading activity, and drivers
using them as shortcuts, particularly with
children and pedestrians in the street.
Requested the concept be revisited.
Staff Team Staff explained that the design follows FHWA guidance, requires a separated ADA-accessible pedestrian path, and includes
parking/loading areas outside the mixed travel area. Horizontal deflection and other traffic-calming features would discourage straight-through travel, and double parking would remain illegal and enforceable.
Terry O'Connell How can green shared streets function
safely if the Specific Plan allows up to 1,000
vehicles per day, which could mean roughly
one vehicle every one to two minutes during
active periods?
Staff Team The 1,000-vehicle figure is a maximum threshold, paired with a 15 mph maximum, based on FHWA guidance and comparable slow-street programs. Staff cited evidence of reduced collisions in San Francisco and noted that the EIR requires the City to monitor safety on these streets.
Baylands Specific Plan | City Council Hearing Comments and Responses
Council Member Comment / Question Response By Response
Cliff Lentz How is the Baylands-specific shuttle different from existing Commute.org service, why
does the proposed route not clearly extend
to the Northeast Ridge and Sierra Point as
described in the Sustainability Framework,
and what happens before the 50%
commercial-occupancy trigger for the
dedicated Baylands shuttle?
Staff Team
BDI
BDI explained that existing Commute.org service and the future Baylands-specific shuttle serve different purposes. Staff said individual projects would contribute to Commute.org/TDM service as development occurs, allowing service to adjust incrementally. The dedicated Baylands shuttle must be in place by the 50% commercial-occupancy trigger; staff/BDI agreed to look further at connections to the Ridge and Sierra Point.
Coleen Mackin Is a 15 mph speed limit on the proposed
green shared streets legally enforceable in
California?
Staff Team Yes. Staff stated that 15 mph limits are enforceable in certain contexts, including this type of shared street, and that the proposed design follows applicable State and FHWA standards. San Francisco slow streets were cited as a comparable example.
Cliff Lentz How were the 11,000 off-street parking-space maximums calculated given the Sustainability Framework's emphasis on
reducing personal parking, car share, shared
parking, and transit-oriented development?
BDI The parking framework started with standard parking-demand assumptions by land use, then applied reductions associated with TDM measures and transit-oriented development. The analysis targeted roughly a 43% reduction from baseline and established an approximately 11,000-space overall cap, with district-specific caps and the ability to phase parking ratios downward as transit/TDM programs mature.
Coleen Mackin Given the regional Smart Corridor/managed-lane system's potential to divert Highway 101 traffic onto Bayshore during severe
congestion or emergencies, has the City
considered whether reducing Bayshore
capacity is wise when Brisbane may not be
able to prevent diverted traffic from entering
the City?
Staff Team Staff acknowledged that regional systems can direct traffic to surface streets in emergency conditions but noted that Bayshore is City-owned and Brisbane retains authority over its street configuration.
Council Member Mackin emphasized that her concern is the potential volume of diverted traffic under a reduced-capacity configuration.
Cliff Lentz Is the TDM coordinator a full-time City
position, and who would employ or manage
that role? Also, does the Specific Plan's
reference to a 2020 VMT baseline rely on
pandemic conditions?
Staff Team The Specific Plan does not designate the employer; TDM coordinators are commonly managed through project/Commute.org processes, with the role potentially shared for smaller projects and expanding as development grows. Staff clarified that the model data described as 2020 reflects 2019 through January 2020 conditions and is therefore pre-pandemic.
Baylands Specific Plan | City Council Hearing Comments and Responses
Council Member Comment / Question Response By Response
Terry O'Connell What provisions are being made for senior mobility within the Baylands, particularly for
residents who may not bicycle, and does
that support more frequent shuttle service?
Staff Team
BDI
BDI cited ADA-compliant design, accessible shuttles, other mobility devices, and potential senior-serving affordable housing. The hearing identified a Phase 1 weekday shuttle with maximum 15-minute headways once the specified trigger is reached, plus on-demand service in other periods. Staff clarified that fixed-route service is triggered at 50% occupancy of commercial floor area in Ice House Hill, with other TDM/on-demand strategies potentially operating earlier.
Coleen Mackin How does the Schlage Lock/Leland Square
development in San Francisco connect to
the Baylands transportation network,
including street continuations and
intersections with Bayshore?
BDI BDI explained that Leland Square is treated as the northern portion of the broader Baylands concept. Existing Visitation Valley streets such as Leland and Sunnydale would extend into the San Francisco development but would terminate before Caltrain rather than becoming through routes to Highway 101. Existing Bayshore intersections would generally remain/connect into the development, although BDI did not have the full Schlage plan available to confirm every intersection detail.
Madison Davis Based on Michael Barnes's comments, can
the project reevaluate bicycle-lane design to
provide more distinct physical separation
from cars and make bicycling a genuinely
viable, low-stress alternative to driving?
Staff Team Staff confirmed that all planned bike lanes are physically separated Class IV facilities, not Class II lanes, and that protected intersections are required. Specific design details can be refined during engineering so long as the Specific Plan standards are met.
Public Comments
Speaker Comment / Question Response By Response
Michael Barnes Urged stronger physical separation of
bicyclists from motor vehicles throughout the
Baylands. Suggested placing landscaping
between traffic lanes and bikeways, avoiding
Class II lanes, strengthening protection at
intersections, using Class IV facilities on
Tunnel Road, reconsidering vegetated
medians where that space could protect
bicyclists, and correcting/clarifying bicycle-facility definitions in the Specific Plan.
Staff Team In follow-up discussion, staff clarified that the Specific Plan requires physically separated Class IV facilities rather than Class II bike lanes, including protected intersections, and that Tunnel Road would have a separated Class IV facility with a raised buffer. Staff said details such as swapping landscaping and bikeway locations could be evaluated during engineering/design review if standards are met.
Baylands Specific Plan | City Council Hearing Comments and Responses
Speaker Comment / Question Response By Response
Linda Salmon Warned that shared bicycle/pedestrian
pathways can create conflicts and cited
experiences where pedestrians were injured
or killed. Urged caution about mixing
bicycles and pedestrians.
Comment noted; no response requested.
Emit Cunningham Suggested reviewing Foster City shared-street examples; questioned whether Brisbane would actually enforce 15 mph
limits; highlighted large-scale bike-share
systems as a useful model; and strongly
supported Class IV bike lanes rather than
relying on high-visibility paint/markings.
Comment noted; no response requested.
Michele Salmon Raised safety concerns about slow/shared streets creating a false sense of security for
pedestrians and conflicts between bicycles
and pedestrians. Asked whether the street
design would safely accommodate three-wheel bicycles, cargo bikes, electric mobility scooters/chairs, and other mobility devices.
No response was provided at the hearing.
Interface with Regional Transportation Network
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Who is responsible for operating and funding the Baylands shuttle service in perpetuity?
Staff Team Shuttles and other TDM services identified in the Specific Plan would be funded by the developer and/or project-generated fees. This includes Commute.org-type service adjustments and other required TDM program elements.
Cliff Lentz /
Madison Davis
Reiterated that the shuttle network should
include a stop serving the Northeast Ridge
so that Ridge residents are not
geographically isolated from the Baylands
and its amenities.
Comment noted; no response requested.
Baylands Specific Plan | City Council Hearing Comments and Responses
Council Member Comment / Question Response By Response
Frank Kern For the center-running Geneva Avenue BRT
concept, who is responsible for ensuring
buses can board from the left-side platform,
has SamTrans formally reviewed/concurred
with the geometry, and how would the cross-section be redesigned if transit providers cannot supply compatible buses?
Staff Team Staff explained that the Specific Plan allows either side-running or center-running BRT; the figure cited is illustrative of the center-running option. Final configuration would be determined with regional transit providers and other parties through implementation of the regional BRT concept identified in the bi-county study.
Cliff Lentz What recent coordination has occurred with
San Francisco regarding the 2013 bi-county
transportation study and projects such as
the Candlestick interchange, Geneva
Avenue Extension/BRT, Third Street light rail
extension, and Bayshore Station
reconfiguration?
Staff Team
BDI
BDI reported recent discussions with San Francisco Planning and SFMTA, joined by Brisbane Public Works, regarding the bi-county study. The study informed the Specific Plan but is about 13 years old; the parties recognize that some elements may need to be revisited or updated during implementation. Regional projects outside the Specific Plan area, such as the Candlestick interchange, were considered in transportation analysis but are not themselves part of the Specific Plan.
Cliff Lentz Suggested convening a regional
transportation forum, potentially with
Congressman Mullin and state/regional
agencies, to revisit the bi-county study,
regional projects, and funding. Asked
whether BDI would participate.
BDI BDI said it would be willing to participate in discussions convened by the Congressman or other regional partners, noting that the projects have regional significance and require participation and fair-share funding from multiple stakeholders.
Coleen Mackin The Specific Plan references the Brisbane Bicycle and Pedestrian Master Plan, last
updated around 2017. Has the City
considered that this reference document is
now outdated?
Staff Team Staff said the 2017 plan is the most current City document. A separate update is being considered/planned but has not yet started.
Madison Davis If TDM and shuttle measures do not achieve the anticipated transportation-performance
results, what mechanism allows the City to
require additional measures?
Staff Team Staff described the existing monitoring framework: Commute.org's countywide TDM program conducts routine monitoring, and Brisbane uses the One Commute platform to monitor projects subject to the City's TDM ordinance in coordination with the project TDM coordinator. The specific additional measures that would be required if performance targets are not met were not identified at the hearing.
Coleen Mackin Noted that the Specific Plan states Brisbane currently has two free shuttle bus routes, but
the routes have been consolidated into one.
Requested correction of this factual
statement.
Comment noted; no response requested.
Baylands Specific Plan | City Council Hearing Comments and Responses
Council Member Comment / Question Response By Response
Cliff Lentz Asked whether smaller on-demand vehicles
could provide first/last-mile service in central
Brisbane and other neighborhoods and
connect riders to the main shuttle network.
Staff Team Staff indicated that on-demand service is a feasible TDM/shuttle strategy and could potentially connect riders to designated shuttle routes; the concept could be considered as service is designed and scaled.
Public Comments
Speaker Comment / Question Response By Response
Roland Suggested smaller on-demand electric
vehicles or neighborhood circulators,
potentially using a central hub, to connect
seniors and other residents with parks,
transit stops, the marina, and other
destinations. Also suggested solar charging
for these vehicles.
Comment noted; no response requested.
Geneva Avenue Extension
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Requested consideration of removing
Specific Plan language that predetermines
future City ownership or a specific funding
mechanism for major infrastructure such as
the Geneva Avenue Extension. Asked that
the applicable infrastructure table identify the
improvement and its transportation role
without presenting City ownership or EIF
funding as predetermined outcomes.
Staff Team Staff understood the concern and indicated that the language/table could be reviewed so financing and ownership are not misconstrued as predetermined. Council direction would be needed for a Plan change.
Terry O'Connell If the Geneva Avenue Extension is not built, what transportation improvements or
mitigation would be required instead, and
can the Specific Plan require the developer
to pay for them? What are the
consequences if the required improvement
is not delivered by the identified
phase/buildout trigger?
Staff Team Staff stated that the EIR identifies the improvement as a mitigation measure and that mitigation would need to be developer funded.
Staff/City Attorney said the consequences and enforcement tied to the buildout trigger require a closer review of the mitigation-monitoring program and committed to return with more detail.
Baylands Specific Plan | City Council Hearing Comments and Responses
Council Member Comment / Question Response By Response
Terry O'Connell Asked what mitigation requirements apply to the Candlestick and Schlage Lock/Baylands
North projects; how those requirements
relate to whether the Candlestick
interchange/Geneva Avenue connection is
built; whether those projects would be out of
compliance with their mitigation
requirements if the regional improvements
are not built; and whether the relevant North
County interchange projects have moved up
CCAG's priority list.
Staff Team Staff explained that approved projects are important to CCAG prioritization and that the interchanges are unlikely to be prioritized until approved projects require them. The Candlestick EIR identifies the interchange as a mitigation measure, with San Francisco responsible for ensuring the Candlestick development fulfills its contribution obligation; Schlage Lock also has a fair-share responsibility. Council Member O'Connell requested a more in-depth follow-up.
Cliff Lentz Requested that BDI locate and provide the
prior conceptual renderings/sketches
showing the Geneva Avenue Extension
connection to the US 101 interchange.
BDI BDI confirmed that BKF had previously prepared conceptual sketches showing different options and agreed to locate them. BDI emphasized that the prior concepts were illustrative and not a final design.
Bayshore Mobility Plan
Public Comments
Speaker Comment / Question Response By Response
Charles Spencer Asked what economic analysis has been
conducted regarding the potential impacts of
the combined Baylands, Visitacion Valley,
and Candlestick development, with or
without the Bayshore road diet, on central
Brisbane retail and its "soft capital
infrastructure." Asked what is planned for
pedestrian and sidewalk safety along the
length of Bayshore as it parallels Brisbane.
No response was provided at the hearing.
Baylands Specific Plan | City Council Hearing Comments and Responses
General / Procedural
Public Comments
Speaker Comment / Question Response By Response
Clark Conway Urged Council to treat Measure JJ as the
City's roadmap and fully implement all of its
commitments, not only housing. Raised
concern that key requirements remain
unresolved or deferred, including reliable
water supply, enforceable landfill-closure
schedules and financial guarantees, energy-neutral sustainable development, infrastructure phasing, and fiscal protections.
Requested clear answers before approval
and a full presentation of all seven EIR
alternatives, including Alternative 7 with
reduced density and lower maximum
building heights.
Comment noted; no response requested.
Karen
Cunningham
Emphasized that Measure JJ was
prescriptive, not aspirational, and urged the
City to strengthen the Specific Plan, close
gaps and ambiguities, and faithfully carry
forward the protections approved by
Brisbane voters.
Comment noted; no response requested.
Dan Griffiths Expressed support for developing the
Baylands and for housing, connectivity,
bicycle access, and new activity that could
support Brisbane businesses, while
acknowledging that environmental and soil-remediation issues need to be addressed.
Comment noted; no response requested.
Michele Salmon Reiterated that all provisions of Measure JJ should be honored. Raised continuing
concern about developing housing on a
highly contaminated site and urged Council
to do its best work for future generations
rather than maximizing development simply
because the maximum is allowed.
Comment noted; no response requested.
Baylands Specific Plan | City Council Hearing Comments and Responses
Speaker Comment / Question Response By Response
Michael Barnes Supported housing on the Baylands and
emphasized working with the Legislature
rather than against it. Recalled proposing
the Baylands fiscal analysis and stressed
that Measure JJ includes fiscal protections
so the project benefits Brisbane rather than
creating an unsustainable financial burden.
Comment noted; no response requested.
Linda Salmon Raised broad concerns about the scale of
development, water availability,
environmental fragility, contaminated fill,
sea-level rise, and project financing. Urged
the City to be cautious and suggested that
Specific Plan approvals or agreements be
limited to the current owner rather than
automatically benefiting a future purchaser.
Comment noted; no response requested.