Baylands Specific Plan | City Council Hearing Comments and Responses

Page 1 of 102 ends

City of Brisbane
Baylands Specific Plan: City Council Hearing Comments and Responses
Summary of questions and comments from the City Council hearings held September 14 through October 26, 2026 This document summarizes the questions and comments raised by City Council members and members of the public during the City Council hearings on the Baylands Specific Plan held to date, together with the responses provided. Entries are organized by hearing and by agenda topic, with Council member questions and public comments presented separately.

Hearings covered: Hearing 1 (September 14, 2026); Hearing 2 (September 29, 2026); Hearing 3 (October 6, 2026); Hearing 4 (October 15, 2026); Hearing 5 (October 20, 2026); Hearing 6 (October 26, 2026).

Entries are summaries and paraphrases prepared by staff; they are not verbatim transcripts. The official meeting minutes and video recordings remain the record of the proceedings.

The Response By column identifies who responded at the hearing, such as City Staff Team (either staff or the City's consultants), the applicant (BDI), or a Council member. It is left blank where no response was provided or requested.

Where the Staff Team have prepared additional information after the hearing, the response is shown in two parts: what was said at the hearing, and a Supplemental Staff Response containing the additional information. Some questions were deferred to later hearings, as noted in the responses.

Hearing 1: September 14, 2026
Overview of Measure JJ / General Plan Requirements
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis When staff finds the Project consistent with the General Plan, does that mean specific
consistency with each policy, or a more
general consistency finding?
Staff Team Consistency means the Plan does not frustrate the core purpose of General Plan policies; Council weighs and balances potentially competing policies, except mandatory "shall/must" policies, which must be specifically implemented.

Madison Davis For standards that are not directly
enforceable, what mechanism ensures
commitments are met over the decades-long
buildout?
Staff Team The Specific Plan's mandatory development standards, together with a Development Agreement that is contractual and runs with the land, provide layers of enforcement.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 2 of 102 ends

Council Member Comment / Question Response By Response
Madison Davis At what point is project-level consistency with Measure JJ, including cumulative
Baylands development, determined? Could
a project be approved if it pushes cumulative
development out of compliance?
Staff Team Each future application is independently evaluated for General Plan / Measure JJ consistency; an inconsistent project can be denied on that basis.

Madison Davis If development does not ultimately achieve a Measure JJ requirement, what authority
does the City have to require corrective
action?
Staff Team It depends on the specific policy. The front-line mechanism is to deny an inconsistent project before approval; post-approval monitoring and enforcement vary by topic and will be addressed at future topic-specific hearings.

Cliff Lentz BDI endorsed Measure JJ when it was on
the ballot. If Measure JJ were on the ballot
today, would BDI still endorse it? Does BDI
believe the Specific Plan is consistent with
Measure JJ?
BDI Yes. Eight years have passed, and BDI is comfortable with the Specific Plan and believes it is consistent with Measure JJ.

Cliff Lentz There have effectively been three iterations:
the BDI plan, the staff-recommended
Specific Plan, and the final Plan informed by
public input. Measure JJ is what binds the
project together because the public voted for
it.

Comment noted.

Cliff Lentz Is there a map showing property ownership,
and what percentage of the Specific Plan
area does each owner hold?
Staff Team The ownership map exists, but it was not attached to the hearing packet. The property-owner notice list mixed owners within the Specific Plan area with owners within 300 feet and was mis-titled.

Cliff Lentz What other projects has Sunquest
completed in the last 5–10 or 10–20 years?
BDI Believes Sunquest built the Bay Point condos near Executive Park through a development partner; clarified that Sunquest is a landowner, not the vertical developer, and uses a master-developer model.

Cliff Lentz Explain how the development process would
work and the respective roles of the
landowner, master developer, and vertical
developers.

BDI Referenced Bay Meadows as an example: master developer brings in residential, affordable housing, school, and commercial development partners. Sunquest is the owner and master developer bringing in experts.

Terry O'Connell If a condition is reflected in the Specific Plan, is it enforceable through the City's land use
authority, while Development Agreement
obligations are enforceable contractually?
Staff Team Generally yes. Specific Plan / Measure JJ requirements are enforced through the City's land use and permit authority, while Development Agreement obligations are contractual; DA obligations can also be tied to permit milestones.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 3 of 102 ends

Council Member Comment / Question Response By Response
Terry O'Connell Are any of the other non-Sunquest property owners listed in the notice part of the
proposed development?
Staff Team/ Not to staff's knowledge for parcels outside the Specific Plan area.

The notice list also included owners within 300 feet and was mis-titled; staff will confirm against the ownership map.

Frank Kern What happens to development if Cal Water
fails to gain approval for water service?
Staff Team Measure JJ requires water rights / a reliable water supply before development can occur.

Frank Kern What legal penalties apply if actual post-construction energy use exceeds on-site solar production?
Staff Team None under the current version of the Plan.

Frank Kern How will sea level rise defenses be updated
over time if the state flood projections
change before the year 2100?
No response was provided at the hearing.

Coleen Mackin Why include 6.5 million square feet of
commercial development instead of maStaff
Team the project all housing?
Staff Team Measure JJ provides for both housing and commercial development.

Commercial development also supports the policy goal that the project be fiscally positive; residential uses tend to require more City services.

Coleen Mackin Would an all-housing project generate
sufficient tax revenue for the City?
Staff Team More precise figures are pending the City's real-estate economist.

Keyser Marston's 2018 analysis found the Measure JJ land-use mix fiscally positive.

Coleen Mackin What is the first step of "site development" for purposes of Measure JJ's water-supply
requirement?
Staff Team City practice treats the first building permit as site development.

Coleen Mackin Can infrastructure or remediation proceed without a secured water source, and is the
current Cal Water commitment sufficient
before site development?
Staff Team A water supply assessment and Cal Water will-serve letter exist, but a binding water-service contract is not yet in place. Measure JJ requires a guaranteed permanent water source before a building permit is issued.

Coleen Mackin Is BDI the sole developer, or will it partner with a master developer and specialty /
vertical developers?
BDI BDI is Sunquest's entitlement arm and will bring in a master developer and specialty developers, similar to the Bay Meadows model.

Terry O'Connell Does all water infrastructure need to be in place before building permits are issued, or
can it be phased with development?
Staff Team Water infrastructure is typically phased through subdivision/public improvement agreements tied to and bonded for each development increment, rather than all being built upfront.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 4 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz Who signs the Development Agreement on
behalf of the developer, and is BDI
authorized to bind Sunquest?
BDI BDI's CEO will sign with ownership's input; BDI confirmed it is authorized to act for Sunquest.

Cliff Lentz Will the Council hearing on fiscal issues / revenue positivity occur after the fiscal
analysis is complete?
Staff Team Keyser Marston's peer review of the applicant's fiscal analysis is ongoing; approximately four weeks once scope is finalized, with the hearing tentatively targeted for October 15, 2026.

Cliff Lentz Will there be a full fiscal analysis of
remediation, infrastructure, roads, open
space, and who pays those costs?
Staff Team Those costs are not part of the economist's current scope. The Specific Plan contemplates mixed financing, including private investment, grants, and CFD/IFD financing; the issue will be discussed at the revenue-positivity / Development Agreement hearing.

Madison Davis If the Keyser Marston review needs another four weeks, Council needs time to review the
findings and may need to adjust the hearing
schedule.

Staff Team Keyser Marston has been asked to expedite the review.

Madison Davis How many acres is the Levenson property,
and how many acres are slated for housing?
Staff Team The Levenson property is approximately 22 acres, less once habitat/easement constraints apply; Baylands housing parcels total approximately 50+ acres.

Madison Davis Has mercury testing been done at the site, including in relation to former hospital
waste?
Staff Team At hearing: The question was deferred to the remediation hearing.

Supplemental staff response (provided after the hearing):

As discussed in the FS/RAPs for UPC OU-SM and OU-2, and in the Closure Plan for the former landfill, various soil and water samples have been tested for mercury. There are no records of the landfill accepting hospital waste.

In addition, the FS/RAPs (UPC OU-SM and OU-2) and the Landfill Closure Plan state that the area will be covered with a cap, except for certain areas where a cap is not feasible. For areas covered with a cap, the cap would prevent exposure of the soil to the public, regardless of whether it is contaminated or not. For areas where it is not feasible to place a cap, contaminated soil, if present, would be removed and replaced with clean fill.

Terry O'Connell /
Coleen Mackin
During the remediation phase, where would
water for uses such as dust suppression
come from?
Staff Team Temporary means could be used, such as a hydrant meter or temporary connection to an existing service.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 5 of 102 ends

Public Comments
Speaker Comment / Question Response By Response
Arnold Garlarza My parcel is not in the Specific Plan area.

Can my name be removed from the
property-owner notice list?
Staff Team Staff confirmed the property is within the 300-foot notice radius, not the Specific Plan area; staff agreed to correct the list and directed him to Planning to finalize the correction.

Paul Beschal Raised concerns about brownfield
conditions, housing location, density-transfer
rights, pump failure, school assignment, and
reliability of Cal Water.

Comment noted.

Randall Vendabal Supports change and Measure JJ;
emphasized protecting Brisbane's small-town character and providing space for small businesses.

Comment noted.

Tom Wagner Supports the project. Comment noted.

Mary Rogers Opposes approval of the Bayshore Mobility
Plan without street-by-street traffic
monitoring, baseline traffic counts,
measurable thresholds, public reporting, and
an opportunity for public response.

Comment noted.

Mary Rogers Do not approve the project until the fiscal impact report is complete; believes key
questions remain unanswered.

Comment noted.

Linda Salmon Is Sunquest the same entity as TonTex, or
did the entity simply change names?
BDI Believes TonTex was completely dissolved and Sunquest is the current owner; the corporate history still needs confirmation.

Linda Salmon Raised concerns about
responsibility/protection, EIR adequacy,
gardens and children on the clay cap, and
insufficient water.

Comment noted.

Doug Cheshire Supports approval of the Specific Plan. Comment noted.

Nancy Moxotl Supports moving forward based on what
voters approved in Measure JJ.

Comment noted.

Emily Wagner Supports the project. Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 6 of 102 ends

Speaker Comment / Question Response By Response
Lizzy Tampia Emphasized the need for quality permanent
hotel jobs.

Comment noted.

Michele Salmon Not opposed to the project but concerned about toxics, EIR data gaps, and lead
deposition along Bayshore Boulevard and
Highway 101.

Comment noted.

Michele Salmon Before breaStaff Team ground, must the
entire project's water supply be secured, or
can water be secured piecemeal as
development occurs?
Staff Team Measure JJ requires a reliable water supply for the full range of proposed uses to be secured before site development, not piecemeal.

Michele Salmon What per-capita GHG emissions figure is
being used, and does it reflect projected
population growth?
Staff Team At hearing: This question was not directly answered at the hearing.

Supplemental staff response (provided after the hearing):

The EIR does not use a tons-per-person GHG threshold. The per-person measure it relies on is vehicle miles traveled per resident and per employee, compared to current regional average rates. That measure comes from the regional travel model, which builds in the region's projected growth through 2040. The EIR reports total project emissions, about 51,000 tons per year, rather than a per-person GHG figure.

Allie Saberman Urged adoption of the Plan. Comment noted.

Clara Johnson Urged adherence to Measure JJ; stated the FEIR does not comply; requested the
environmentally superior alternative; asked
the City to slow the process; objected to the
road diet.

No response was provided at the hearing.

Clara Johnson Is Sunquest a wholly owned subsidiary of
Universal Paragon / UPC, and how do the
various corporate and entitlement entities
relate?
BDI Will research and report back on the corporate structure and entity names.

Clara Johnson Asked whether water infrastructure should be in place before development begins.

Staff Team Staff noted that each increment of development would have infrastructure built at developer cost, and that infrastructure would be sized appropriately for the development.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 7 of 102 ends

Speaker Comment / Question Response By Response
Karen
Cunningham
As an author of Measure JJ, asked who is
responsible for landfill closure/remediation
given the mercury-testing concern; whether
the water-supply commitment is adequate;
who funds infrastructure/services; and how
revenue positivity will be demonstrated.

Staff / Council explicitly deferred the questions rather than giving a live answer and requested a considered written response.

Frank Coen What will be done differently to keep new
Baylands streets from settling like Lagoon
Road, and who pays for street / utility repairs
10–30 years later?
Staff Team Infrastructure construction is the developer's responsibility; long-term maintenance and ownership responsibility has not yet been fully developed.

Frank Coen Will Baylands be subject to the full 1%
public-art fee, with no exemption or
reduction?
Staff Team The Plan requires compliance with the City's public art ordinance, currently 1%. Staff recommended that Council direct the Plan to state "1%" explicitly rather than only cross-referencing the ordinance.

Emmett
Cunningham
Without penalties, how are solar, financial,
and water requirements enforced? What
happens if actual water use exceeds Cal
Water's guaranteed amount?
Staff Team Upfront design/performance standards are enforced through the permit process; no penalty mechanism currently exists for future homeowner over-use. Other enforcement questions depend on the specific requirement.

Emmett
Cunningham
How long do building permits last? Staff Team Building permits last one year and are extended with each inspection.

Emmett
Cunningham
What happens if actual water usage
exceeds Cal Water's guaranteed amount?
No complete answer was provided on the record.

Emmett
Cunningham
Does CFD / Mello-Roos financing conflict
with Measure JJ's requirement that
infrastructure be entirely funded by the
developer rather than shifted to future
residents?
Staff Team,
Madison Davis
CFDs raise revenue against future assessed value and are repaid by future owners; whether that structure is consistent with Measure JJ's "entirely funded by the developer" language is a policy / legal question for Council.

Wilbur M. Supports the project and emphasized small-business interests.Comment noted.

Larisa Ocanada Supports the project on behalf of
SAMCEDA.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 8 of 102 ends

Sustainability Measures of the Specific Plan
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Is the EIR definition of energy neutrality correct?
Staff Team The EIR used a conservative, physical-impacts-based definition.

Measure JJ itself does not define "energy neutral," and Council may also consider a broader reading incorporating the Sustainability Framework.

Madison Davis Does staff believe the Specific Plan is
energy neutral as required by the
Sustainability Framework and Measure JJ,
given that approximately 53.5% of demand
is met on site?
Staff Team The consistency determination is ultimately Council's. The 53.5% figure does not credit battery storage or summer grid feed-in, and the Sustainability Framework allows off-site / grid procurement as an available, but not sole, path to neutrality.

Madison Davis What accounting standard is required for
energy neutrality, and is there an ongoing
mechanism to track performance over time?
Staff Team,
Coleen Mackin
There is no standardized accounting method yet. The Planning Commission recommended exploring tracStaff Team /reporting options. Staff prefers upfront prescriptive design standards, but tracStaff Team could be added if Council directs it.

Madison Davis What is the test for determining consistency with the Sustainability Framework and
Measure JJ's energy-neutrality requirement?
Staff Team The ultimate consistency determination is for Council; the Framework's principles and available pathways to energy neutrality inform that determination.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 9 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz Is there an energy self-sufficiency study or master infrastructure / financing plan and
timeline for energy buildout?
Staff Team At hearing: Staff noted that the 2023 Thornton Tomasetti energy study underlies the EIR energy modeling.

Supplemental staff response (provided after the hearing):

The study used the land use plan, building typology, industry-standard energy consumption estimates, weather simulations, and standard Title 24 building energy model inputs. It was based on the 2022 CALGreen code and has not been updated to reflect the current Specific Plan, the current CALGreen code, LEED and GreenPoint requirements, or advances in energy efficiency, solar photovoltaic efficiency, and battery technology. As such, it is a conservative estimate of project energy consumption (i.e., it likely overestimates consumption and underestimates solar generation and battery storage).

The study also included a buildout phasing plan based on the buildout schedule and land use plan available in 2023. It represents an industry-standard energy analysis adequate for CEQA review purposes and is not intended as a binding energy engineering specification or requirement. Specific energy phasing and financing are intended to be defined in the Development Agreement.

Cliff Lentz When does BDI plan to build the solar farm? Will west-side homes be energy efficient
before the solar farm is built?
BDI The solar farm is planned for Phase 2, after soil is moved and the landfill area is capped. Phase 1 buildings would have rooftop solar/battery systems and mandatory 100% renewable electricity enrollment.

Cliff Lentz Who owns and operates the distributed
battery system, and how would stored /
excess energy be sold?
BDI The battery would be owned by the development, potentially through a private partnership; energy would be sold through contracts with PG&E and, for the utility-scale battery, CAISO.

Cliff Lentz Did the team consider biogas or other
community renewable-energy sources, such
as energy from water treatment?
BDI Yes. These were evaluated in the Thornton Tomasetti energy-balance study.

Cliff Lentz Emphasized the need to fulfill what voters
approved in Measure JJ.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 10 of 102 ends

Council Member Comment / Question Response By Response
Terry O'Connell With the solar farm not built until Phase 2 / landfill closure, how will the project create
on-site generation beyond initial needs?
At hearing: This question was redirected to the Topic 3 discussion (Air Quality, Greenhouse Gas Emissions, and Energy), which was continued to September 29, 2026.

Supplemental staff response (provided after the hearing):

The Final EIR does not conclude that on-site generation exceeds the project's electricity demand. FEIR Table 4.11-7 shows on-site generation meeting about 34.2 percent of on-site demand in the first analysis year (assumed to be 2037, with the first increment of the solar field), 50.2 percent in 2038, and 53.5 percent (92,445 MWh per year) at full buildout (assumed to be 2042). On that measure, the FEIR states the project would not be energy neutral. The remaining demand is supplied from the grid, and the Specific Plan requires utility customers to enroll in the 100 percent renewable option of the local community choice provider to the maximum extent allowed by law.

The approximately 55-acre ground-mounted solar field is built in increments as portions of the Title 27 landfill closure are completed.

The FEIR does not provide a more precise completion schedule because landfill closure is subject to state regulatory oversight. The 2037, 2038, and 2042 dates are assumed analysis years, not guaranteed completion dates. The applicant anticipates landfill closure within approximately 10 years of when soil is first removed.

Building-mounted solar is to be constructed concurrent with building construction. The Specific Plan requires a minimum of 85,000 MWh per year of on-site generation at buildout (the FEIR estimates 92,445 MWh) and 30 MW of distributed battery storage installed with site-specific development. The Specific Plan and FEIR do not set separate interim on-site generation percentages for each development phase.

Impacts EN-1 and EN-2 are less than significant. Whether the timing of on-site generation is consistent with Measure JJ is a policy question for the Council.

Sources: FEIR Vol. 1, Table 3-7, p. 3-109; FEIR Vol. 2, pp. 4.11-19 (fns. 242, 243), 4.11-40 to 4.11-43; FEIR Vol. 4, Response M-OSEC-121, p. 13-324; FEIR Vol. 6, Responses OSEC-32 and OSEC-34; FEIR Appendix I, Table 7; Specific Plan Section 4.3.1 (May 2026 redline, pp. 4-6 to 4-7).

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 11 of 102 ends

Council Member Comment / Question Response By Response
Terry O'Connell How are air-quality / GHG and health
impacts from ongoing landfill closure and
construction mitigated once residents are
already living on site?
Staff Team At hearing: Council Member O'Connell redirected this portion of the question to the Topic 3 discussion (Air Quality, Greenhouse Gas Emissions, and Energy), which was continued to September 29, 2026.

Supplemental staff response (provided after the hearing):

Residents on site during construction were modeled. The health risk assessment (HRA) assumed residents living in new homes while construction of the remaining blocks continues. It modeled a child receptor beginning in the third trimester, exposed to ongoing construction emissions plus operational emissions for a total of 30 years, beginning as early as 2029. It also evaluated the on-site middle school (9-year exposure) and on-site workers. After mitigation, no location exceeded the applicable health-risk thresholds.

Frank Kern How will the Sustainability Framework's

0.282 tons CO2e per employee per year
commuting-reduction KPI actually be
measured?
Staff Team At hearing: The KPI is illustrative rather than prescriptive. Staff expects the project may beat the threshold once EIR travel-demand data are broken out, but the precise figure was not available at the hearing.

Supplemental staff response (provided after the hearing):

The 2015 Sustainability Framework derived the 0.282 figure from the following assumptions: transportation emissions are 16.6 MTCO2e per person per year, and 4.7 MTCO2e per person per year for business-related transportation (CoolCalifornia.org); a sustainable global level of GHG emissions is 3.9 MTCO2e per person per year (IPCC); one quarter of that, or about 1 MTCO2e per person per year, is from transportation (the Framework cites no source for this assumption); a reduction from 16.6 to 1.0 is 94 percent; and therefore a 94 percent reduction from 4.7 yields 0.282 MTCO2e per person per year.

Based on the latest version of EMFAC2025 and the FEIR's estimate of 11 daily commute miles per employee, estimated 2030 emissions per employee for the County are 0.636 MTCO2e, or about twice the KPI. This estimate does not account for the project's CALGreen Tier 2 EV charging infrastructure and its effect on the project's vehicle fleet.

Frank Kern / Terry
O'Connell
What phase will the water recycling facility
come online, especially relative to the still-pending Cal Water agreement? BDI The committed facility would come online at about 20% buildout once there is sufficient sewer flow. Under the not-yet-finalized Cal Water deal, a larger jointly funded facility could come online earlier.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 12 of 102 ends

Council Member Comment / Question Response By Response
Coleen Mackin How were the batteries sized, and what
assumptions were used for building energy
consumption?
Staff Team, BDI Sizing is based on the 2023 Thornton Tomasetti report's phased energy-balance modeling across buildout, using industry-standard consumption assumptions by use type.

Coleen Mackin Will the WRF be in place when the first
homes are built?
BDI The committed facility is expected at about 20% buildout; a larger facility under the pending Cal Water agreement could potentially come online earlier.

Cliff Lentz Was the Thornton Tomasetti energy study
peer-reviewed by ESA or anyone else?
Staff Team At hearing: This question was noted for follow-up.

Supplemental staff response (provided after the hearing):

The Thornton Tomasetti study is the applicant's engineering study and was not independently peer reviewed by an outside engineer.

ESA reviewed it for reasonableness before using it in the EIR. ESA checked the energy-use rates by building type, the land uses, and the phasing against the project description, and compared the results with its own CalEEMod estimates, which were more conservative but in the same range. ESA did not audit the underlying calculations or the energy model. Whether to commission a third-party review is a City decision.

Cliff Lentz Was LEED Platinum considered for
commercial buildings, rather than the LEED
Gold floor?
BDI No LEED expert was present at the hearing; BDI will follow up.

Madison Davis How many acres are available at Sierra
Point, and could that area be used for off-site energy generation? BDI Approximately 7 acres was discussed, subject to confirmation.

Madison Davis Does staff or the Planning Commission
recommend the road-diet portion of the
Mobility Plan?
Staff Team The Planning Commission recommended eliminating the road-diet component; staff's recommendation was to adopt the full Mobility Plan, including the road diet.

Public Comments
Speaker Comment / Question Response By Response
Paul Beschal How can the City move forward when
mitigation measures are required only "when
feasible"? Who decides what is feasible, and
does that wording create a loophole?
Staff Team "Feasible" is a defined CEQA term; EIR mitigation measures have already been determined feasible, and CEQA requires adoption of all feasible measures. Beschal said this did not resolve his concern about conditional "when feasible" wording.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 13 of 102 ends

Speaker Comment / Question Response By Response
Paul Beschal Is "open space and/or open area" wording a loophole that could allow private, less-protected open areas instead of true public open space? Who decides ownership and
maintenance?
Staff Team Public open space exceeds 25% of developable land even excluding open areas, the solar farm, and lagoon. Ownership / maintenance responsibility for open space versus open area is intended to be resolved later through the Development Agreement / future discussion.

Anthony Walker Challenged ESA's August 7, 2026 Planning Commission memo as redefining "energy
neutral" to allow approximately 53% on-site
generation plus grid procurement, contrary
to the Sustainability Framework's on-site-first
/ in-Brisbane-second / grid-last order and
ESA's March 2025 Energy Resources
Technical Report. Asked whether this
represents a policy change that should be
decided by Council.

Mayor Mackin asked a clarifying question about off-site renewable purchases; Walker clarified that the Framework calls for off-site generation within Brisbane. No direct rebuttal of the core critique was provided.

Linda Salmon Referenced the 1994 General Plan FARs
and suggested commercial development
with residential above and solar panels near
the north end.

Comment noted.

Michele Salmon If the project cannot be energy neutral, reduce the non-housing portion of the
project rather than housing; consider
additional renewable-energy approaches
such as wind.

Comment noted.

Allie Saberman Supports the project on behalf of a housing coalition.

Comment noted.

Susan Brandon Under the Cal Water concept, would
Brisbane receive recycled / "toilet-to-tap"
water while the Baylands receives fresh
water?
Staff Team No toilet-to-tap facility is proposed. The Specific Plan water recycling facility would produce non-potable recycled water for non-potable uses.

Susan Brandon When soil is moved from east to west, what happens to the contaminated soil?
Staff Team The soil proposed for relocation is clean stockpiled soil, not contaminated soil. The remediation / capping approach will be covered at the dedicated remediation hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 14 of 102 ends

Speaker Comment / Question Response By Response
Susan Brandon If residents experience a cancer cluster or other health effects decades later, who
would be liable?
Staff Team The property owner / developer is responsible for complying with cleanup orders and regulatory mandates.

Clara Johnson Stated that batteries only store energy, that 47% is not energy neutral, and that more
solar acreage is needed.

Comment noted.

Clara Johnson Is the railroad refusing to allow the soil-conveyor system over its tracks, which would mean reverting to approximately
1,200 truck trips per day?
At hearing: This question was not addressed at the hearing.

Supplemental staff response (provided after the hearing):

Mitigation Measure AQ-1f requires the cleanest commercially available technology for moving soil from the east side to the west side, with Model Year 2020 trucks required at a minimum. An electric conveyor is one listed option; low- or zero-NOx trucks are another. A conveyor over the Caltrain right-of-way would need approval from the CPUC and Caltrain, and Caltrain has commented that it may not be feasible.

The EIR analyzed the truck scenario (about 640 round trips per day at the peak, over roughly three years), and its conclusions do not rely on a conveyor. The health risk analysis also does not assume a conveyor will be built, and the health risk impact (AQ-2) remains less than significant with mitigation without it. The regional air quality impact (AQ-1) is significant and unavoidable with or without the conveyor.

Revised Mitigation Measure AQ-1f does not eliminate the conveyor.

Rather, the revisions require Best Available Control Technology (BACT) to reduce NOx from the transport of excavated materials and provide options for achieving BACT, including use of different truck technologies, a conveyor to avoid trucks, or other means and methods that meet the BACT definition.

Clara Johnson What would the project's energy and water needs be under the Environmentally
Superior Alternative, for comparison?
Not addressed on the record.

Clara Johnson Was this the first time Council heard about Cal Water's proposal to double the recycling
facility's size in exchange for potable water,
and what are the toxic-byproduct / SFPUC
implications?
Not answered; deferred to a future water-topic hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 15 of 102 ends

General / Procedural
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Frank Kern If hearing topics are changed or added, how
should the meetings be noticed?
Staff Team Staff noted that a session can be added and that re-noticing is not required.

Coleen Mackin Suggested a subcommittee meeting to cover remaining items.

Procedural item; no response requested.

Coleen Mackin Continued the hearing to September 29 at
5:30 PM and discussed adding another
meeting to catch up.

Procedural item; no response requested.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 16 of 102 ends

Hearing 2: September 29, 2026
Air Quality, Greenhouse Gas Emissions, and Energy Impacts and Mitigation Measures Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Does the Specific Plan and EIR evaluate the full buildout program of 2,200 dwelling units,

6.5 million square feet of commercial use,
and 500,000 square feet of hotel use?
Staff Team Yes. The Specific Plan allows development of the full program, and the environmental analyses discussed apply to that program.

Cliff Lentz Why is the project's regional GHG impact
considered less than significant? Is the
conclusion based on the Baylands' transit-oriented location and design producing lower emissions than the same growth elsewhere?
Staff Team Yes. The analysis considers the project's location, transit accessibility, mix of uses, and required design features. Development at the Baylands is expected to generate lower regional GHG emissions than comparable growth in a less transit-accessible location without those features.

Cliff Lentz If the regional GHG impact is less than
significant, does that mean mitigation is not
required for that impact, and why was the
draft EIR offset requirement removed?
Staff Team Yes for the regional GHG impact. The Final EIR removed the offset requirement because the regional GHG impact was determined to be less than significant. Other mitigation measures remain for separate impact categories, including plan consistency.

Cliff Lentz The sustainability framework says buildings should be designed for zero carbon
emissions. What Specific Plan requirements
implement that goal, and how is compliance
verified?
Staff Team The Specific Plan includes mandatory solar, distributed battery facilities, energy-efficiency standards, 100% carbon-free energy requirements, and the mandatory steps in Section 4.3. Compliance is verified through development review and permitting; a project that does not comply would not receive permits.

Madison Davis Should the City require site-wide carbon
budgeting, monitoring and reporting, with
corrective action if actual performance does
not achieve the assumed zero-carbon
outcome, including if residents do not opt
into 100% renewable electricity?
Staff Team Discussion focused on the Specific Plan's mandatory zero-carbon building requirements and development-review enforcement. Council raised ongoing reporting/corrective action as an additional implementation concept.

Cliff Lentz The EIR used a conservative estimate of
approximately 53% on-site energy
generation. How does that relate to the
Specific Plan's energy-neutrality objective?
Staff Team The 53% figure was described as a conservative EIR assumption.

Staff indicated that compliance with more current building-code standards would be expected to result in a higher percentage of building energy use generated on site.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 17 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz Alternative 7 reduces development and
building heights. Did the EIR quantify GHG
emissions for the alternatives, including the
reduced-development alternative?
Staff Team Yes. The EIR includes a quantified GHG analysis prepared by ESA and compares project emissions with emissions expected under the alternatives.

Cliff Lentz How is approximately 2.5 million cubic yards of soil expected to move from the east side
to the west side: conveyor or trucks?
BDI Both methods were studied in the EIR. BDI's preference is to avoid public streets and move soil across the Caltrain tracks, but the method remains subject to ongoing coordination with Caltrain.

Cliff Lentz If trucks are used to move soil, were those truck trips included in the air-quality
analysis?
Staff Team Yes. The construction analysis assumed on-road diesel trucks moving the full 2.5 million cubic yards from east to west. That activity contributed to AQ-1 being significant and unavoidable and is addressed by Mitigation Measure AQ-1f.

Cliff Lentz /
Madison Davis
How much truck activity could soil
movement generate if trucks are used?
Staff Team The analysis identified peak activity of approximately 640 round trips per day during the soil-movement period. Based on 2.5 million cubic yards and approximately 20 cubic yards per truck, the discussion identified roughly 125,000 one-way loads/trips.

Terry O'Connell Did the air-quality analysis assume soil is moved only once? Will some soil have to be
moved more than once to complete the east-side landfill closure and grading? Staff Team, BDI The EIR analysis assumed the 2.5 million cubic yards is moved once from east to west. BKF clarified that soil remaining on the east side will be moved within the east side as part of the Title 27 closure and pad grading, but soil moved west would not be moved back east and no additional soil import is anticipated for that process.

Cliff Lentz Can the Specific Plan require electric trucks rather than diesel trucks for soil movement?
Staff Team Staff indicated such a requirement would need to account for feasibility and commercial availability. Mitigation Measure AQ-1f already requires the best available control technology and lowest-emitting commercially available equipment at the time of construction, which could include zero-emission trucks, an electric conveyor, or a combination.

Madison Davis /
Cliff Lentz
Because AQ-1f is an EIR mitigation
measure, is that sufficient, or should the
lowest-emitting truck requirement also be
repeated in the Specific Plan so it is easier
for the public to find?
Staff Team If the EIR is certified and the mitigation monitoring and reporting program adopted, the mitigation measure becomes a project requirement. Council discussed whether this particular requirement should also be repeated in the Specific Plan.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 18 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz Should Council evaluate GHG emissions
using a Specific Plan-area/site perspective
rather than, or in addition to, the regional
'whether here or there' approach?
Staff Team Staff explained that the City has discretion to select supported thresholds; GHG is generally analyzed as a regional/global impact, and the Final EIR uses a regional threshold for the applicable impact.

Staff Team also noted that GHG-3 evaluates project features and emissions at the project site using project-specific thresholds. Lentz requested that the regional-versus-site approach return for Council deliberation.

Cliff Lentz When would the solar field be delivered
relative to west-side development?
BDI BDI described the solar field as occurring near the end of the first phase / during the transition from west-side development to east-side development, after the necessary soil movement and landfill work. It is not a day-one improvement.

Frank Kern What changed between the earlier
conclusion that the project would not be
energy neutral and the later conclusion that
grid-supplied renewable energy could
support a consistency finding?
Staff Team Staff said the option to use grid-supplied renewable energy was always available. What changed was the context and methodology used to evaluate the policies, including additional analysis prepared in response to Planning Commission questions about Measure JJ consistency.

Madison Davis Which pollutants drive the AQ-1 significant and unavoidable conclusion, and how do
construction impacts compare with
operational impacts?
Staff Team After mitigation, ROG, NOx, PM10 and PM2.5 exceed the applicable thresholds when construction, operations and overlapping activity are considered. For construction alone, NOx is the pollutant that exceeds the threshold; for operations alone, all four exceed. Operational ROG and particulate emissions are substantially higher than construction emissions, while NOx is of a similar order.

Terry O'Connell Is using a regional GHG framework rather than a site-specific framework legally
required, or is it a discretionary analytical
choice by the City?
Staff Team The City has discretion to define thresholds if supported by evidence.

Staff explained that GHG emissions are regional/global impacts and that state guidance informed the regional approach, but ultimately the threshold choice is a City decision.

Terry O'Connell How long were significant construction
emissions evaluated, and how were health
effects on residents living near ongoing
construction addressed?
Staff Team AQ-1 evaluated construction from 2026 through 2033, as well as operational phases and full buildout. Potential exposure of on-site and off-site residents to localized construction and operational emissions was evaluated separately in the EIR as a health-risk impact with its own threshold and mitigation.

Cliff Lentz Who prepared the air-quality study? Staff Team ESA prepared the air-quality analysis.

Cliff Lentz Evaluate the GHG emissions performance of
Alternative 7 and compare it to the Project
Staff responded to a similar question at this hearing (see Council Member Lentz's question on Alternative 7 above).

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 19 of 102 ends

Public Comments
Speaker Comment / Question Response By Response
Paul Beschal Commented that a conveyor may still require truck activity and urged keeping soil-hauling
trucks off local streets because of dust and
diesel emissions; suggested an over-track
solution.

Staff Team At hearing: Staff noted that a separate remediation hearing would address soil handling and remediation in more detail.

Supplemental staff response (provided after the hearing):

The EIR impact analyses consider the movement of soil on site by both equipment and trucks, as best articulated in Mitigation Measure AQ-1f, subsection 3, Applicability: "The BACT requirement applies to any construction equipment or vehicle used to transport excavated material from its initial excavation location to another portion of the site for transfer purposes, including transfer to a conveyor system and/or movement across Tunnel Avenue. Transport activities subject to this measure include but are not limited to hauling, conveying, or otherwise moving excavated soil material for fill balancing purposes." An over-track solution would fit within the EIR's air quality, greenhouse gas, energy, and noise analysis assumptions and could reduce, but not necessarily avoid, construction-related impacts to the extent it reduces truck trip length and the distribution of trucks onto local roads.

Anthony Walker Questioned how the EIR can conclude the
GHG impact is less than significant when the
Baylands would add substantial project
emissions; expressed concern that removal
of the outcome-based offset mitigation
leaves no mechanism tied to actual project
emissions or corrective action.

No response was provided at the hearing.

Michele Salmon Raised concerns about dust controls, regular soil testing, covered trucks and a covered
conveyor, and urged stronger requirements
rather than relying solely on regulatory
agencies.

Staff Team Staff stated that EIR dust-control requirements apply and that trucks would be covered; the conveyor would also be covered.

Dana Dillworth Asked whether existing emissions from the landfill and Kinder Morgan were included in
the GHG calculations.

Staff Team Staff indicated those existing sources are part of baseline conditions; the project analysis evaluates new emissions associated with the project.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 20 of 102 ends

Speaker Comment / Question Response By Response
Karen
Cunningham
Raised concern about asbestos and mercury
in soil becoming airborne during soil
movement and construction.

Staff Team At hearing: Staff indicated mercury and remediation issues would be addressed during the remediation hearing.

Supplemental staff response (provided after the hearing):

As discussed in Appendix D of the UPC OU-SM FS/RAP and
Appendix F of the OU-2 FS/RAP, the stockpiled soil will be tested for chemicals in accordance with DTSC's Information Advisory, Clean Imported Fill Material (October 2001). The list of required analyses includes mercury. If the detected concentration of mercury exceeds regulatory action levels, that soil would be excluded from use and sent for disposal at an offsite landfill permitted to accept the waste.

As discussed in EIR Section 4.9, Air Quality, Bay Area Air Quality Management District (BAAQMD) Regulation 6, Rules 1 and 6 (Fugitive Dust Control), sets standards and requirements for controlling and reducing fugitive dust emissions. In addition, City Policy 202b requires demolition and construction projects to conform to the BAAQMD recommended dust control measures.

Land Use Plan & Design Topics
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Coleen Mackin Can the Council legally remove the High-Speed Rail Light Maintenance Facility reservation from the Specific Plan?
Staff Team Staff stated that Council has discretion to adopt the plan with or without the LMF reservation; both configurations were studied in the EIR.

Madison Davis What interim uses could occur in the LMF
area while environmental cleanup and future
development advance?
BDI BDI described existing/interim uses such as outdoor storage and vehicle/parStaff Team storage and discussed uses that could support the landowner's environmental and development work.

Frank Kern If Council retains the LMF reservation now,
can the Specific Plan later be amended to
remove it? What options does Council have?
Staff Team Council may adopt the Specific Plan with or without the LMF. If adopted with the LMF, the Plan could later be amended to remove it.

Both options were studied in the EIR.

Frank Kern Could the Specific Plan retain the LMF
reservation but include an expiration date?
Staff Team Staff indicated an expiration mechanism could potentially be built into the Specific Plan.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 21 of 102 ends

Council Member Comment / Question Response By Response
Frank Kern How will development and soil movement
occur around existing uses that remain on
the Baylands?
Staff Team Staff confirmed that existing uses may remain while surrounding Baylands work proceeds; the detailed interface with existing uses will require implementation coordination.

Terry O'Connell If the LMF is removed, what land-use and design controls would apply to the area,
including controls on noise, lighting and
future uses?
Council discussed the City's future review tools and the implications of removing the LMF reservation, but the response was not fully resolved during the hearing.

Cliff Lentz Can BDI provide renderings showing how
the proposed heights and housing types
would look together, including towers in
relation to the Roundhouse and lower-scale
residential development?
BDI BDI and the design team acknowledged the request. Council asked for additional visualizations to help the public understand the proposed scale and mix of development.

Cliff Lentz Is Baylands Boulevard intended to be a
mixed-use shopping street with residential
as well as retail?
BDI Yes. BDI clarified that the area is planned as mixed use with both residential and retail components.

Cliff Lentz Could residential development be extended
south of Main Street, or would doing so
require a change to Measure JJ / voter
approval?
Staff Team Council discussed the Measure JJ boundary and requested clarification regarding whether residential south of Main Street could be considered. The issue was not resolved during the hearing.

Public Comments
Speaker Comment / Question Response By Response
Melissa Foley Provided comments on Baylands open
space / estuary issues and prior input
provided to BDI.

Comment noted.

Paul Beschal Raised concerns regarding Visitacion Creek and its potential effect on development,
including how density or development
capacity may respond to constraints.

Comment noted.

Allie Saberman Urged the City Council to certify the EIR. Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 22 of 102 ends

Speaker Comment / Question Response By Response
Michele Salmon Raised concern that lead deposition along Bayshore Boulevard and Highway 101 has
not been adequately studied, particularly in
relation to a potential school site; supported
conservation easements and lower building
heights.

Staff Team At hearing: No complete response was provided at the hearing.

Supplemental staff response (provided after the hearing):

The FS/RAPs (UPC OU-SM and OU-2) and the Landfill Closure Plan state that the area will be covered with a cap, except for certain areas where a cap is not feasible. For areas covered with a cap, the cap would prevent exposure of the soil to the public, regardless of whether it is contaminated or not. For areas where it is not feasible to place a cap, contaminated soil, if present, would be removed and replaced with clean fill.

Linda Salmon Supported allowing housing on the Baylands but raised concerns about placing residents
on contaminated land; urged a flexible plan
and argued that environmental issues
should be resolved before approvals
proceed.

Comment noted.

Roland Lebrun Suggested Giken silent piling as an
alternative construction technology and
advocated removing the high-speed rail
maintenance facility from Brisbane, disputing
the EIR's rejection of an alternative location.

Comment noted.

Objective Standards and Design Guidelines
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis What design authority will the City retain when individual development proposals
come forward?
Staff Team Future buildings are not approved by the Specific Plan itself. Projects remain subject to City review under the Specific Plan's standards and applicable review processes. Council emphasized retaining meaningful design oversight.

Madison Davis Are the Chapter 3 design standards
complete and fixed, or can the City refine or
add standards later?
Staff Team The standards are intended to be comprehensive, but the City may amend the Specific Plan and adopt/refine standards in the future.

Housing review is more constrained by objective-design-standard requirements than commercial review.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 23 of 102 ends

Council Member Comment / Question Response By Response
Madison Davis Can the City retain or hire third-party design professionals to review future Baylands
proposals?
Staff Team Yes. Staff indicated the City can use third-party design expertise in future review.

Madison Davis Does the Specific Plan expressly state that the City retains design review authority over
future buildings? Council wants to ensure
the City retains full design control to the
extent legally available.

Staff Team Staff clarified that the Specific Plan functions more like a regulatory code and does not itself approve individual buildings. Staff agreed to review the language in response to Council's concern.

Cliff Lentz Should the City conduct additional design
engagement or use outside design
organizations/experts so future Baylands
buildings and neighborhoods reflect
Brisbane's character and are inviting and
cohesive?
Staff Team, BDI The design team explained that the standards were developed to be feasible and flexible and drew from prior engagement, but additional precedent work and community engagement could further define what is authentic to Brisbane. Council expressed interest in continued public design engagement.

Schools / Community Facilities
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Frank Kern Are the potential middle-school sites
identified in the Roundhouse area large
enough for a middle school?
Staff Team Staff said it would follow up. The Specific Plan identifies potential school locations, but the hearing did not resolve the acreage/site-program question.

Cliff Lentz How will the Baylands school-district
boundary issue be addressed, and will BDI
actively participate in discussions about
placing Baylands students within one school
district?
BDI BDI said the landowner had previously requested a boundary change and is willing to participate in a collaborative discussion. Any boundary change would require action by the applicable school district(s).

Madison Davis Should BDI and the City convene
representatives of both school districts and
Council members to advance the school-boundary discussion rather than leaving it as a general future conversation?
BDI BDI agreed the topic warrants further discussion outside the hearing forum.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 24 of 102 ends

Noise / Building Construction
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Coleen Mackin Mitigation Measure NOI-1 limits pile driving where geological conditions permit. When is
pile driving actually necessary, and which
parts of the site have geological conditions
that would require or allow it?
Staff Team At hearing: Staff said it would return with additional information.

Supplemental staff response (provided after the hearing):

Given the underlying Bay Mud, pile driving could be implemented anywhere in the area. However, if pile driving is implemented through existing portions of the cap, the entity conducting the pile driving would be required to submit a plan to the overseeing regulatory agency for review and approval describing procedures to restore and maintain the integrity of the cap.

Roundhouse / Objective Standards and Design Guidelines
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Why does the architectural-compatibility
requirement around the historic Roundhouse
extend only 50 feet? Should the compatible-design area be broader? BDI The 50-foot distance comes from the EIR mitigation measure addressing visual effects on the historic resources. The design team noted that Chapter 2 and Chapter 3 also include inspiration imagery and other design direction.

Open Space and Amenities
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Can Mission Blue Nursery remain in its
current location?
BDI The Planning Commission recommended retaining Mission Blue Nursery in its current location, and Council expressed support for the nursery.

Cliff Lentz Can Icehouse Hill retain elements of
Brisbane's rural character, including
concepts such as an urban farm or stables?
Council raised the concept for consideration; no final direction or detailed response was reached during this portion of the hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 25 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz / Frank
Kern / Madison
Davis
Should the Specific Plan more intentionally
plan for childcare, rather than merely
allowing childcare as a use?
Staff Team Council members expressed support for addressing childcare in the Specific Plan, including the recommendation to add a childcare goal to Section 2.2.

Cliff Lentz Why are the community ballfields located
where shown rather than adjacent to the
potential school site?
BDI BDI said the location reflects prior outreach, including community interest in locating the ballfields closer to central Brisbane and the Crocker area.

Public Comments
Speaker Comment / Question Response By Response
Ariel (San Bruno
Mountain Watch /
Mission Blue
Nursery)
Supported retaining Mission Blue Nursery in
its current location and emphasized its role
in habitat restoration, locally native plant
propagation, community use, and the
mountain-to-bay ecological connection.

Comment noted.

Eileen McLaughlin Supported conservation easements and
stronger habitat-sensitive lighting controls,
including shielding/timing to prevent spill into
sensitive habitat and a warm 2700K
standard rather than using full-moon
brightness as a daily benchmark.

Comment noted.

Dao Jane Pei /
Build Up San
Mateo County
Requested that childcare be intentionally
planned for in the Baylands land-use
framework, particularly near residential
neighborhoods and employment centers,
and supported adding a childcare goal to
Section 2.2.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 26 of 102 ends

Sea Level Rise
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Could a tidal gate be considered as part of the sea-level-rise strategy for Brisbane
Lagoon, including to help prevent lagoon
flooding onto adjacent properties?
Staff Team At hearing: The design team noted that Sierra Point Parkway, the Caltrain tracks, and other low-lying infrastructure create a broader shoreline challenge and that sensitive mudflats would need to be protected. Staff Team explained that the Specific Plan's north lagoon shoreline is relatively high and well suited to a nature-based horizontal-levee / gradual-slope adaptation approach, and that a tide gate is not necessary for that portion of the shoreline.

Supplemental staff response (provided after the hearing):

Other sea-level-rise adaptation planning efforts, which consider the entire lagoon, are likely to be relevant to the final plan for the lagoon, but the Specific Plan area is not likely to constrain that overall plan.

Coleen Mackin Sea-level-rise work outside the Specific Plan has identified a problem near the
bridge/railroad intersection at the northwest
lagoon shoreline that could affect Caltrain.

Should the Baylands team coordinate with
the consultants studying the full lagoon
shoreline so the approaches connect?
Staff Team At hearing: Staff Team agreed that shoreline adaptation must account for transitions between parcels. He noted that the Tunnel Avenue/railroad drainage area is outside the Specific Plan area and had not been reviewed by him in detail, but coordination between adjoining shoreline approaches is important.

Supplemental staff response (provided after the hearing):

On the north side of the creek mouth there is a small tidal marsh that transitions to a gentle upland slope in the Specific Plan area's southwest corner, consistent with the Specific Plan's proposed habitat plan for the lagoon's north shoreline.

The low points just outside the southwest corner of the Specific Plan area appear to be the Caltrain tracks (approximately 14 feet NAVD) and the Brisbane fire station (approximately 13 feet NAVD), which are about 4 feet and 3 feet above today's 100-year bay water level, respectively.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 27 of 102 ends

Council Member Comment / Question Response By Response
Frank Kern How will sea-level rise and raised Baylands
grades affect existing-use areas such as
Recology, Golden State Lumber and Kinder
Morgan that are not being raised?
Staff Team At hearing: Council flagged these lower existing-use areas as potential flooding interfaces. The discussion recognized that grades and adaptation measures must transition across parcel boundaries; detailed site-specific resolution was not completed at the hearing.

Supplemental staff response (provided after the hearing):

Most of the existing fuel tank farm, lumber yard, and recycling facilities are on ground with elevations of 17 feet NAVD or above.

This elevation is about six feet above the current 100-year bay flood elevation, so most of these facilities are not at risk of coastal flooding until sea-level rise exceeds six feet. A few portions of the northeast corner of the fuel tank farm are at lower elevations (approximately 13 to 15 feet NAVD), but these areas appear to be occupied only by parStaff Team lots and outbuildings. The portion of Visitacion Creek that runs along the northern edge of the tank farm will be upstream of the Specific Plan's proposed tide gate, further limiting the coastal flood hazard for the tank farm.

For most of these areas, the existing ground surface elevation is only a few feet from the minimum proposed grade for the Specific Plan area, 19 feet NAVD, so grading to manage transitions between Specific Plan areas and these existing facilities should not be especially challenging.

Remediation
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Council Member
(name not
recorded)
The east side has unregulated garbage and
waste. When soil is moved from east to
west, how does the contractor know when it
is hitting toxic waste? Should anything be
added to the Plan to address this?
At hearing: Staff indicated these issues could be addressed during the remediation hearing.

Supplemental staff response (provided after the hearing):

All waste at the former landfill has been covered with a soil stockpile that will be used to create a cap across the Specific Plan area. The thickness of, and depth to, buried waste is approximate in some areas. To address this, the Landfill Closure Plan states that "Future study to update the location of waste material will be performed for final project design." This study will map the bottom of the soil stockpile and the top of the buried landfill waste.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 28 of 102 ends

Public Comments
Speaker Comment / Question Response By Response
Charles Spencer What is the direction of flow of contaminants underneath the cap and where are potential
accumulation points?
Does the cap create a situation where
pressure builds and can't be relieved the
way it normally would? If so, is there an
analysis on how that pressure is relieved?
At hearing: Staff indicated these issues could be addressed during the remediation hearing.

Supplemental staff response (provided after the hearing):

As discussed under Impact HWQ-3 in EIR Section 4.14, Hydrology and Water Quality, an extraction system will be installed at the former landfill designed to capture and treat leachate and groundwater. This extraction system will direct groundwater flow toward the system, as shown on Figure 4.14-7, which would prevent pressure or accumulation points.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 29 of 102 ends

Hearing 3: October 6, 2026
Land Use Plan & Design Topics
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Frank Kern How does the Specific Plan address off-street loading bays, staging areas, curb management, and tenant move-in/move-out
activity during monthly peak turnover periods
in high-density residential areas, rather than
only general deliveries?
Staff Team The Specific Plan includes standards for driveway and loading operations modeled in part on San Francisco practices, including reserving on-street loading space or demonstrating that loading can be accommodated on site, plus procedures for addressing complaints. These requirements are embedded in Chapter 6 and transportation-related design/mitigation materials.

Coleen Mackin Has BDI coordinated with San Francisco
Planning/SFMTA regarding the Bayshore
Caltrain Station Plaza and San Francisco's
Bayshore Multimodal Facility Study,
including its alternative concepts?
BDI BDI has had initial regional-infrastructure discussions with San Francisco Planning and SFMTA, but has not yet coordinated on the exact station-plaza design. BDI said coordination with relevant stakeholders will be required once a design is advanced. Council Member Mackin emphasized that this coordination is important to undertake in advance.

Coleen Mackin How will the required affordable housing be delivered in a timely manner if different
neighborhoods are built by multiple
developers over many years? Will affordable
units be prioritized, and when would the
larger Housing Element goal of 514
affordable units be completed?
BDI, Staff Team BDI said the 15% inclusionary requirement would be delivered in phases, with each development phase including its affordable component, often through partnerships with nonprofit affordable-housing developers. BDI cautioned against requiring affordable units to be built first because nonprofit financing can take two to four years to assemble. Staff clarified that 2,200 units at 15% equals 330 inclusionary units; the 514 figure comes from the Housing Element and is a broader City goal.

Terry O'Connell Is affordable housing counted differently during Housing Element planning than when
units are actually built, with planning
assumptions based on density but actual
affordability determined by sales price or
rent?
Staff Team Yes. During Housing Element planning, affordability can be assumed based on the density for which land is planned. When development permits are issued and reported to HCD, actual sales prices or rents determine the income category of completed units.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 30 of 102 ends

Public Comments
Speaker Comment / Question Response By Response
Karen
Cunningham
Requested physical/3D models or similarly
understandable visualizations showing the
proposed Baylands, including the effect of fill
elevations, building heights, and the
Roundhouse, so residents can better
understand what the development would
look like from Brisbane and as the project
evolves.

Comment noted.

Linda Salmon Commented that the hearing process and
timing of public comment were confusing
and that it is difficult for the public to
comment meaningfully before seeing the full
presentation and discussion on a topic.

Comment noted.

Michele Salmon Raised concern about 22-story buildings, including whether fire equipment and fire-department capabilities are adequate for buildings of that height and whether
earthquake and fire risks have been
sufficiently considered.

Comment noted.

Open Space and Amenities
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Requested a final accounting of the
approximately 157 acres identified as open
space/open area, separately showing
permanent habitat conservation, wetlands,
publicly accessible parkland, recreational
open space, and privately controlled open
area, preferably on a map with acreage
totals for each category.

Staff Team Staff noted that an existing Specific Plan figure provides some of this information. Council Member Davis clarified that she would like total acreages parsed by category, including combined totals for active recreation areas, to make the allocation clearer.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 31 of 102 ends

Council Member Comment / Question Response By Response
Madison Davis Does the Specific Plan preserve flexibility to change recreational or community amenities
over time as community needs change, and
what authority would the City have to require
a different amenity than one shown in an
illustrative plan?
Staff Team Future parks, open spaces, and trails would require site-specific improvement plans as development occurs. The Parks and
Recreation Commission has delegated review authority under the Specific Plan and would review those plans using the Plan's framework and policy direction.

Madison Davis Given the Baylands' environmental history and remediation/landfill-closure oversight by
other agencies, can the City secure
permanent public-access, maintenance, and
utility easements for infrastructure, parks,
and open space while leaving fee ownership
and responsibility for the landfill cap,
remediation, and future environmental
failures with the responsible property owner
or other legally responsible party?
Requested clearer Specific Plan language if
feasible.

Staff Team Yes. Publicly accessible open space can remain privately owned through easements/dedications and associated ownership, maintenance, and operating agreements. Staff said that, if Council directs, language could be brought forward maStaff Team this approach more explicit or mandatory.

Public Comments
Speaker Comment / Question Response By Response
Michele Salmon Questioned the proposed location of the
community fields because the area
historically functioned as wetland, may
become wet again, and appears constrained
for parStaff Team by surrounding uses and
infrastructure.

No response was provided at the hearing.

Michael Barnes Opposed treating the existing Mission Blue Nursery location as necessarily fixed.

Suggested that the nursery could operate on
remediated land because plants are grown
on tables, while the limited clean land could
be reserved for more sensitive receptors or
uses that require direct soil contact.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 32 of 102 ends

Roundhouse / Objective Standards and Design Guidelines
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Coleen Mackin Is the Page & Turnbull Roundhouse
rehabilitation concept in the Specific Plan a
prescriptive blueprint or an illustrative idea,
who is expected to undertake the
renovation, and how would the restoration
and long-term operation be financed?
BDI BDI stated that the Page & Turnbull concept is a real adaptive-reuse plan and that the Roundhouse must be preserved. Financing is envisioned as a stack of private equity/funding, CFDs,
HOAs/commercial associations, and potentially public-art funds.

Revenue-producing uses such as shops, cafés, restaurants, theater/event uses, and other active uses are intended to help support long-term maintenance.

Madison Davis If Roundhouse programming changes over
time, does the Specific Plan require a
continuing public museum, educational,
cultural, historic-interpretation, or community
component so the public can appreciate the
Roundhouse even if portions are used for
restaurants, cafés, or events?
BDI The EIR requires future adaptive reuse to undergo design review and comply with the Secretary of the Interior's Standards, but Kathy Cleveland did not identify an explicit requirement for a historic-interpretation component. BDI said the Roundhouse is intended primarily as a public amenity/open-air amphitheater and park, with commercial uses as a smaller component, and agreed that educational signage or interpretation is appropriate.

Public Comments
Speaker Comment / Question Response By Response
Michele Salmon Raised concern about toxic contamination at the Roundhouse site and asked how
contamination would be remediated if the
Roundhouse remains at its existing
elevation/location rather than being raised or
relocated.

Council Member Mackin indicated that the remediation issue would likely be addressed under the remediation topic.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 33 of 102 ends

Sea Level Rise
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Does the Specific Plan require ongoing
groundwater monitoring or site-specific
groundwater baselines so the City can
detect whether actual groundwater
conditions differ from the assumptions used
in the EIR as sea level rises?
Staff Team At hearing: The sea-level-rise/groundwater expert was not available.

Staff committed to return to the question in connection with the remediation or phasing discussion.

Supplemental staff response (provided after the hearing):

The Specific Plan does not require ongoing groundwater monitoring.

For the landfill's remedial actions, ongoing sea-level-rise vulnerability assessments, which would likely include monitoring groundwater levels, would likely be required (for example, DTSC sea-level-rise vulnerability assessments include five-year reviews).

Madison Davis For buildings or infrastructure constructed later in the multi-decade buildout, how does
the Specific Plan ensure that the applicable
future 100-year sea-level-rise projection is
reevaluated at the time of development
rather than relying only on today's 2100
assumptions?
Staff Team Staff stated that the infrastructure provisions require ongoing application of updated standards, particularly for sea-level rise and flood levels, so current standards would be applied as future development permits are processed.

Circulation / Street Sections
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Raised a fundamental concern with green
shared streets because pedestrians,
bicyclists, and vehicles would occupy the
same space in a dense mixed-use
neighborhood. Requested Council consider
removing the concept and using more
conventional separated facilities with clearly
defined space for vehicles, bicycles, and
pedestrians.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 34 of 102 ends

Council Member Comment / Question Response By Response
Frank Kern Shared concern about green shared streets
based on experience with Argyle Street in
Chicago. While the concept can work in a
commercial/retail setting, questioned how
well it would work in a residential
neighborhood with children, cars, bicycles,
and other mobility devices sharing space.

Comment noted.

Cliff Lentz Requested examples of neighborhood-type
green shared streets and asked how bicycle
sharing would be implemented and whether
it is a required City TDM measure or a
developer strategy.

BDI, Staff Team BDI said bike share is a key TDM strategy and could be implemented through an existing or new program, potentially with sponsorship.

Staff clarified that bike share/shared micromobility is identified in the Specific Plan as a physical TDM feature, but it is not one of the City's required TDM measures because there is no current countywide program; it is an optional project strategy used to help meet traffic-reduction targets.

Terry O'Connell The project video and Specific Plan appear to show Caltrain tracks at grade with the
development even though development
pads would be raised. How would that work,
and would the developer be responsible for
paying to change the Caltrain grade?
Staff Team Staff said the issue requires further review and could be addressed as part of the phasing discussion.

Coleen Mackin Raised concern that green shared streets
may not function safely with deliveries,
double parStaff Team , loading activity, and
drivers using them as shortcuts, particularly
with children and pedestrians in the street.

Requested the concept be revisited.

Staff Team Staff explained that the design follows FHWA guidance, requires a separated ADA-accessible pedestrian path, and includes parStaff Team /loading areas outside the mixed travel area. Horizontal deflection and other traffic-calming features would discourage straight-through travel, and double parStaff Team would remain illegal and enforceable.

Terry O'Connell How can green shared streets function
safely if the Specific Plan allows up to 1,000
vehicles per day, which could mean roughly
one vehicle every one to two minutes during
active periods?
Staff Team The 1,000-vehicle figure is a maximum threshold, paired with a 15 mph maximum, based on FHWA guidance and comparable slow-street programs. Staff cited evidence of reduced collisions in San Francisco and noted that the EIR requires the City to monitor safety on these streets.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 35 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz How is the Baylands-specific shuttle different from existing Commute.org service, why
does the proposed route not clearly extend
to the Northeast Ridge and Sierra Point as
described in the Sustainability Framework,
and what happens before the 50%
commercial-occupancy trigger for the
dedicated Baylands shuttle?
BDI, Staff Team BDI explained that existing Commute.org service and the future Baylands-specific shuttle serve different purposes. Staff said individual projects would contribute to Commute.org/TDM service as development occurs, allowing service to adjust incrementally. The dedicated Baylands shuttle must be in place by the 50% commercial-occupancy trigger; staff/BDI agreed to look further at connections to the Ridge and Sierra Point.

Coleen Mackin Is a 15 mph speed limit on the proposed
green shared streets legally enforceable in
California?
Staff Team Yes. Staff stated that 15 mph limits are enforceable in certain contexts, including this type of shared street, and that the proposed design follows applicable State and FHWA standards. San Francisco slow streets were cited as a comparable example.

Cliff Lentz How were the 11,000 off-street parStaff
Team -space maximums calculated given
the Sustainability Framework's emphasis on
reducing personal parStaff Team , car
share, shared parStaff Team , and transit-oriented development? BDI The parStaff Team framework started with standard parStaff Team -demand assumptions by land use, then applied reductions associated with TDM measures and transit-oriented development.

The analysis targeted roughly a 43% reduction from baseline and established an approximately 11,000-space overall cap, with district-specific caps and the ability to phase parStaff Team ratios downward as transit/TDM programs mature.

Coleen Mackin Given the regional Smart Corridor/managed-lane system's potential to divert Highway 101 traffic onto Bayshore during severe
congestion or emergencies, has the City
considered whether reducing Bayshore
capacity is wise when Brisbane may not be
able to prevent diverted traffic from entering
the City?
Staff Team Staff acknowledged that regional systems can direct traffic to surface streets in emergency conditions but noted that Bayshore is City-owned and Brisbane retains authority over its street configuration.

Council Member Mackin emphasized that her concern is the potential volume of diverted traffic under a reduced-capacity configuration.

Cliff Lentz Is the TDM coordinator a full-time City
position, and who would employ or manage
that role? Also, does the Specific Plan's
reference to a 2020 VMT baseline rely on
pandemic conditions?
Staff Team The Specific Plan does not designate the employer; TDM coordinators are commonly managed through project/Commute.org processes, with the role potentially shared for smaller projects and expanding as development grows. Staff clarified that the model data described as 2020 reflects 2019 through January 2020 conditions and is therefore pre-pandemic.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 36 of 102 ends

Council Member Comment / Question Response By Response
Terry O'Connell What provisions are being made for senior mobility within the Baylands, particularly for
residents who may not bicycle, and does
that support more frequent shuttle service?
Staff Team BDI cited ADA-compliant design, accessible shuttles, other mobility devices, and potential senior-serving affordable housing. The hearing identified a Phase 1 weekday shuttle with maximum 15-minute headways once the specified trigger is reached, plus on-demand service in other periods. Staff clarified that fixed-route service is triggered at 50% occupancy of commercial floor area in Ice House Hill, with other TDM/on-demand strategies potentially operating earlier.

Coleen Mackin How does the Schlage Lock/Leland Square
development in San Francisco connect to
the Baylands transportation network,
including street continuations and
intersections with Bayshore?
BDI BDI explained that Leland Square is treated as the northern portion of the broader Baylands concept. Existing Visitation Valley streets such as Leland and Sunnydale would extend into the San Francisco development but would terminate before Caltrain rather than becoming through routes to Highway 101. Existing Bayshore intersections would generally remain/connect into the development, although BDI did not have the full Schlage plan available to confirm every intersection detail.

Madison Davis Based on Michael Barnes's comments, can
the project reevaluate bicycle-lane design to
provide more distinct physical separation
from cars and make bicycling a genuinely
viable, low-stress alternative to driving?
Staff Team Staff confirmed that all planned bike lanes are physically separated Class IV facilities, not Class II lanes, and that protected intersections are required. Specific design details can be refined during engineering so long as the Specific Plan standards are met.

Public Comments
Speaker Comment / Question Response By Response
Michael Barnes Urged stronger physical separation of
bicyclists from motor vehicles throughout the
Baylands. Suggested placing landscaping
between traffic lanes and bikeways, avoiding
Class II lanes, strengthening protection at
intersections, using Class IV facilities on
Tunnel Road, reconsidering vegetated
medians where that space could protect
bicyclists, and correcting/clarifying bicycle-facility definitions in the Specific Plan.

Staff Team In follow-up discussion, staff clarified that the Specific Plan requires physically separated Class IV facilities rather than Class II bike lanes, including protected intersections, and that Tunnel Road would have a separated Class IV facility with a raised buffer. Staff said details such as swapping landscaping and bikeway locations could be evaluated during engineering/design review if standards are met.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 37 of 102 ends

Speaker Comment / Question Response By Response
Linda Salmon Warned that shared bicycle/pedestrian
pathways can create conflicts and cited
experiences where pedestrians were injured
or killed. Urged caution about mixing
bicycles and pedestrians.

Comment noted.

Emmett
Cunningham
Suggested reviewing Foster City shared-street examples; questioned whether Brisbane would actually enforce 15 mph
limits; highlighted large-scale bike-share
systems as a useful model; and strongly
supported Class IV bike lanes rather than
relying on high-visibility paint/marStaff Team
s.

Comment noted.

Michele Salmon Raised safety concerns about slow/shared streets creating a false sense of security for
pedestrians and conflicts between bicycles
and pedestrians. Asked whether the street
design would safely accommodate three-wheel bicycles, cargo bikes, electric mobility scooters/chairs, and other mobility devices.

No response was provided at the hearing.

Interface with Regional Transportation Network
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Who is responsible for operating and funding the Baylands shuttle service in perpetuity?
Staff Team Shuttles and other TDM services identified in the Specific Plan would be funded by the developer and/or project-generated fees. This includes Commute.org-type service adjustments and other required TDM program elements.

Cliff Lentz /
Madison Davis
Reiterated that the shuttle network should
include a stop serving the Northeast Ridge
so that Ridge residents are not
geographically isolated from the Baylands
and its amenities.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 38 of 102 ends

Council Member Comment / Question Response By Response
Frank Kern For the center-running Geneva Avenue BRT
concept, who is responsible for ensuring
buses can board from the left-side platform,
has SamTrans formally reviewed/concurred
with the geometry, and how would the cross-section be redesigned if transit providers cannot supply compatible buses?
Staff Team Staff explained that the Specific Plan allows either side-running or center-running BRT; the figure cited is illustrative of the center-running option. Final configuration would be determined with regional transit providers and other parties through implementation of the regional BRT concept identified in the bi-county study.

Cliff Lentz What recent coordination has occurred with
San Francisco regarding the 2013 bi-county
transportation study and projects such as
the Candlestick interchange, Geneva
Avenue Extension/BRT, Third Street light rail
extension, and Bayshore Station
reconfiguration?
Staff Team BDI reported recent discussions with San Francisco Planning and SFMTA, joined by Brisbane Public Works, regarding the bi-county study. The study informed the Specific Plan but is about 13 years old; the parties recognize that some elements may need to be revisited or updated during implementation. Regional projects outside the Specific Plan area, such as the Candlestick interchange, were considered in transportation analysis but are not themselves part of the Specific Plan.

Cliff Lentz Suggested convening a regional
transportation forum, potentially with
Congressman Mullin and state/regional
agencies, to revisit the bi-county study,
regional projects, and funding. Asked
whether BDI would participate.

BDI BDI said it would be willing to participate in discussions convened by the Congressman or other regional partners, noting that the projects have regional significance and require participation and fair-share funding from multiple stakeholders.

Coleen Mackin The Specific Plan references the Brisbane Bicycle and Pedestrian Master Plan, last
updated around 2017. Has the City
considered that this reference document is
now outdated?
Staff Team Staff said the 2017 plan is the most current City document. A separate update is being considered/planned but has not yet started.

Madison Davis If TDM and shuttle measures do not achieve the anticipated transportation-performance
results, what mechanism allows the City to
require additional measures?
Staff Team Staff described the existing monitoring framework: Commute.org's countywide TDM program conducts routine monitoring, and Brisbane uses the One Commute platform to monitor projects subject to the City's TDM ordinance in coordination with the project TDM coordinator. The specific additional measures that would be required if performance targets are not met were not identified at the hearing.

Coleen Mackin Noted that the Specific Plan states Brisbane currently has two free shuttle bus routes, but
the routes have been consolidated into one.

Requested correction of this factual
statement.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 39 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz Asked whether smaller on-demand vehicles
could provide first/last-mile service in central
Brisbane and other neighborhoods and
connect riders to the main shuttle network.

Staff Team Staff indicated that on-demand service is a feasible TDM/shuttle strategy and could potentially connect riders to designated shuttle routes; the concept could be considered as service is designed and scaled.

Public Comments
Speaker Comment / Question Response By Response
Roland Lebrun Suggested smaller on-demand electric
vehicles or neighborhood circulators,
potentially using a central hub, to connect
seniors and other residents with parks,
transit stops, the marina, and other
destinations. Also suggested solar charging
for these vehicles.

Comment noted.

Geneva Avenue Extension
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Requested consideration of removing
Specific Plan language that predetermines
future City ownership or a specific funding
mechanism for major infrastructure such as
the Geneva Avenue Extension. Asked that
the applicable infrastructure table identify the
improvement and its transportation role
without presenting City ownership or EIF
funding as predetermined outcomes.

Staff Team Staff understood the concern and indicated that the language/table could be reviewed so financing and ownership are not misconstrued as predetermined. Council direction would be needed for a Plan change.

Terry O'Connell If the Geneva Avenue Extension is not built, what transportation improvements or
mitigation would be required instead, and
can the Specific Plan require the developer
to pay for them? What are the
consequences if the required improvement
is not delivered by the identified
phase/buildout trigger?
Staff Team Staff stated that the EIR identifies the improvement as a mitigation measure and that mitigation would need to be developer funded.

Staff/City Attorney said the consequences and enforcement tied to the buildout trigger require a closer review of the mitigation-monitoring program and committed to return with more detail.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 40 of 102 ends

Council Member Comment / Question Response By Response
Terry O'Connell Asked what mitigation requirements apply to the Candlestick and Schlage Lock/Baylands
North projects; how those requirements
relate to whether the Candlestick
interchange/Geneva Avenue connection is
built; whether those projects would be out of
compliance with their mitigation
requirements if the regional improvements
are not built; and whether the relevant North
County interchange projects have moved up
CCAG's priority list.

Staff Team Explained that approved projects are important to CCAG prioritization and that the interchanges are unlikely to be prioritized until approved projects require them. The Candlestick EIR identifies the interchange as a mitigation measure, with San Francisco responsible for ensuring the Candlestick development fulfills its contribution obligation; Schlage Lock also has a fair-share responsibility. Council Member O'Connell requested a more in-depth follow-up.

Cliff Lentz Requested that BDI locate and provide the
prior conceptual renderings/sketches
showing the Geneva Avenue Extension
connection to the US 101 interchange.

BDI BDI confirmed that BKF had previously prepared conceptual sketches showing different options and agreed to locate them. BDI emphasized that the prior concepts were illustrative and not a final design.

Bayshore Mobility Plan
Public Comments
Speaker Comment / Question Response By Response
Charles Spencer Asked what economic analysis has been
conducted regarding the potential impacts of
the combined Baylands, Visitacion Valley,
and Candlestick development, with or
without the Bayshore road diet, on central
Brisbane retail and its "soft capital
infrastructure." Asked what is planned for
pedestrian and sidewalk safety along the
length of Bayshore as it parallels Brisbane.

No response was provided at the hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 41 of 102 ends

General / Procedural
Public Comments
Speaker Comment / Question Response By Response
Clark Conway Urged Council to treat Measure JJ as the
City's roadmap and fully implement all of its
commitments, not only housing. Raised
concern that key requirements remain
unresolved or deferred, including reliable
water supply, enforceable landfill-closure
schedules and financial guarantees, energy-neutral sustainable development, infrastructure phasing, and fiscal protections.

Requested clear answers before approval
and a full presentation of all seven EIR
alternatives, including Alternative 7 with
reduced density and lower maximum
building heights.

Comment noted.

Karen
Cunningham
Emphasized that Measure JJ was
prescriptive, not aspirational, and urged the
City to strengthen the Specific Plan, close
gaps and ambiguities, and faithfully carry
forward the protections approved by
Brisbane voters.

Comment noted.

Dan Griffiths Expressed support for developing the
Baylands and for housing, connectivity,
bicycle access, and new activity that could
support Brisbane businesses, while
acknowledging that environmental and soil-remediation issues need to be addressed.

Comment noted.

Michele Salmon Reiterated that all provisions of Measure JJ should be honored. Raised continuing
concern about developing housing on a
highly contaminated site and urged Council
to do its best work for future generations
rather than maximizing development simply
because the maximum is allowed.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 42 of 102 ends

Speaker Comment / Question Response By Response
Michael Barnes Supported housing on the Baylands and
emphasized worStaff Team with the
Legislature rather than against it. Recalled
proposing the Baylands fiscal analysis and
stressed that Measure JJ includes fiscal
protections so the project benefits Brisbane
rather than creating an unsustainable
financial burden.

Comment noted.

Linda Salmon Raised broad concerns about the scale of
development, water availability,
environmental fragility, contaminated fill,
sea-level rise, and project financing. Urged
the City to be cautious and suggested that
Specific Plan approvals or agreements be
limited to the current owner rather than
automatically benefiting a future purchaser.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 43 of 102 ends

Hearing 4: October 15, 2026
Sustainability Measures of the Specific Plan
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Terry O'Connell Asked whether future building-permit
applications must undergo individual energy
assessments, or whether the Specific Plan
could require energy studies or tracStaff
Team of energy performance for individual
buildings.

Staff Team The prior building-energy study is a nonregulatory input to the EIR energy model, not standards that permit applicants must match.

Future buildings must meet the energy-performance requirements of the Specific Plan and then-current building code. The Plan currently uses forward-looStaff Team standards rather than post-construction energy reporting; Council could direct additional tracStaff Team provisions, but how resulting data would be used would need discussion.

Terry O'Connell Clarified that the concern was how much energy future buildings would produce on
site, not whether they would comply with the
current energy code; favored stronger use-specific energy-generation requirements in the Specific Plan over either a peer review
or a new study that could become outdated.

Staff Team The prior study modeled consumption and potential on-site generation for different building types. Staff Teamcharacterized its older consumption assumptions as likely conservative; the Specific Plan already has prospective efficiency and on-site-generation standards tied to future codes and could be amended to require more developer-provided on-site generation. No specific new threshold was adopted at this point.

Cliff Lentz Requested at least one additional proposal
from Introba (formerly Integral Group),
whose personnel worked on Brisbane's
sustainability framework and may know the
project, before choosing an energy peer-review or new-study consultant.

Coleen Mackin The Mayor clarified that Council Member Lentz was proposing another bid. Later, when a majority supported proceeding with a peer review using Ramboll to avoid delay, Council Member Lentz said he was amenable to that approach.

Terry O'Connell Stated that independent review is prudent where the energy study originated with the
developer, but was also open to a full new
study given the age of the prior study.

Comment noted.

Frank Kern Asked how long a full new energy study
would take compared with the proposed
four-to-six-week peer review.

Staff Team Staff did not yet have a formal estimate for a new study. Staff Team gave a rough estimate of two to three months, rather than years, and said he could obtain more precise proposals. The peer-review schedule reflected approximately 50 hours of work.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 44 of 102 ends

Council Member Comment / Question Response By Response
Frank Kern Asked whether Ramboll's $17,250 proposed
peer-review cost was reasonable.

Staff Team Staff Team considered the quote typical for specialized work: about 50 hours at an average of $345 per hour. He could obtain other bids and expected broadly comparable pricing.

Frank Kern Asked who would reconcile the old energy
study with potentially conflicting peer-review
findings and decide which information
should be used, including if the review
recommended more work.

Staff Team Staff Team said peer review can affirm the original study or identify additional work, so follow-on work is possible but not inevitable. Staff Team explained that the original study was one nonregulatory input to ESA's EIR energy projections; review would assess whether the assumptions remain adequate for that purpose or need adjustment. A separate decision-maker or reconciliation procedure was not discussed.

Frank Kern Asked whether costs of a peer review or a
new energy study are reimbursable.

Staff Team The City's current reimbursement agreement covers project-processing costs that are necessary to move the project forward.

Frank Kern Expressed support for proceeding with a
peer review rather than a full new energy
study at this time.

Comment noted.

Madison Davis /
Coleen Mackin
Questioned the value of peer-reviewing old
energy-generation assumptions, including
the study's approximately 53% on-site
generation estimate, rather than defining a
desired energy-neutral outcome directly in
the Specific Plan; offered an illustrative 85%
on-site/15% clean-power mix, not an
adopted target.

Favored an independent peer review for
current technical guidance before Council
specifies energy performance expectations,
rather than Council selecting requirements
without expert review; preferred using
Ramboll promptly and asStaff Team
whether the work could be completed in four
weeks.

Asked directly whether a peer review of an
older study or a wholly new study would
provide the most accurate, up-to-date
energy information.

Staff Team Later, Staff Team explained that a peer review would principally examine methodology and acknowledge older numbers and code changes; it might also offer insight on metrics or objectives for the Specific Plan. Staff gave an informal estimate of about $70,000 and two to three months for a full new study. No energy-neutral percentage was established.

Staff Team described the anticipated methodological focus of the review and the different scope of a new study. Later, the Mayor identified support from three Council members for at least a peer review, Council Member Lentz agreed to using Ramboll, and the Mayor stated that staff had direction.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 45 of 102 ends

Council Member Comment / Question Response By Response
Terry O'Connell Asked whether changed energy figures after review would require reopening the EIR and
returning it to the Planning Commission.

Staff Team The EIR would not need to be reopened unless new information identified a new or more severe environmental impact. Staff Teamanticipated updated energy assumptions would more likely show lower use and a smaller impact, although this has not yet been confirmed by analysis.

Terry O'Connell Questioned how an energy study can
forecast future energy use when the ultimate
mix of offices, biotech, and other building
uses is unknown, and suggested applying
energy-neutrality/on-site generation
requirements to the buildings that are
actually proposed.

Staff Team The original study used assumed energy use for building types permitted under the project, not predictions of the exact future tenants or uses. The Plan's current framework focuses on enforceable forward-looStaff Team energy standards at building-permit stage, and Council could choose to strengthen those standards.

Terry O'Connell Noted that many EIR technical studies are four to six years old and questioned whether
concerns about age should apply to all of
them; commented that repeatedly updating
the underlying analyses could delay the
project.

Staff Team CEQA typically evaluates baseline conditions at the time of the notice of preparation; Staff Teamdid not have its exact date. He said EIR analyses generally used conservative assumptions to account for uncertainty; later new or more severe impacts could still necessitate further environmental review.

Cliff Lentz Cited Measure JJ's energy-neutral objective, the study's apparent shortfall, its developer
commissioning, and absence of peer review;
supported spending roughly $17,000 on a
reimbursable independent peer review to
inform Council and the public.

Comment noted.

Madison Davis Although favoring performance requirements in the Specific Plan, stated that if a peer
review would help other Council members
proceed with adoption she supported
obtaining it, ideally on the four-week
schedule suggested by the Mayor.

Comment noted.

Coleen Mackin Asked whether requiring an energy study for each future building would impose costs
around $70,000 per building.

Staff Team A building-specific study could be in that general cost range, potentially less for a single building than a study spanning multiple typologies; Staff Team cautioned it would still be a meaningful expense.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 46 of 102 ends

Bayshore Mobility Plan
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Supported the Planning Commission's
recommendation to omit the Bayshore road
diet and hoped to discuss that choice in
deliberations.

Comment noted.

Terry O'Connell Agreed with not narrowing Bayshore
Boulevard.

Comment noted.

Cliff Lentz Asked what the Bayshore Mobility Plan's
road diet was intended to mitigate or
accomplish, given concerns about reducing
four traffic lanes to two.

Staff Team Staff Team identified speed reduction as the principal purpose. Staff Team added the General Plan goal of reducing Bayshore's function as a regional through route; 60%–80% of current trips were characterized as regional, and modeling found the road diet was the only evaluated measure effective at shifting that traffic.

Frank Kern Asked whether reducing the posted
Bayshore speed limit from 45 mph to 35
mph could achieve speed reduction without
narrowing the road.

Staff Team Staff Team raised enforceability concerns. Staff Team later explained Bayshore is identified as a high-injury network street, allowing safety-based speed-limit reductions, but indicated limits should be paired with engineering measures that actually slow vehicles.

Coleen Mackin Questioned the combined feasibility of a
Bayshore road diet given future connections
from Visitacion Valley, uncertainty about
Geneva Avenue Extension funding,
Candlestick growth, trucks and transit
demand, and the Highway 101 Smart
Corridor system that may divert freeway
traffic onto local streets.

Staff Team Staff Team described the county/CCAG Smart Corridor program and forthcoming maintenance memorandum. His review did not identify restrictions on the City's existing road-design authority; under contemplated agreements Brisbane would permit traffic diversion during major freeway incidents. Traffic-capacity modeling for the combined scenario was not discussed at the hearing.

Coleen Mackin Asked specifically whether Brisbane could reject or challenge the Smart Corridor's
diversion of cars off Highway 101 onto
Tunnel Avenue or Bayshore.

Staff Team Under agreements still to be finalized, the City would be agreeing to diversion during major incidents; Whether the City could decline diversion during such incidents was not discussed further.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 47 of 102 ends

Council Member Comment / Question Response By Response
Frank Kern Asked whether sidewalks, bicycle paths,
protected turns, bus facilities, and
intersection safety treatments could still fit if
Bayshore retains two through lanes in each
direction rather than adopting a road diet.

Staff Team The drawings show one concept, and right-of-way width varies. A sidewalk can fit, but a continuous Class I path with full buffer is not necessarily feasible without further engineering, turn-pocket and median decisions. Many crossing/intersection safety measures and Baylands-specific mitigations could be packaged without a road diet, while a redesigned corridor-wide alternative would need to be developed.

Coleen Mackin Asked what California rules allow speed
reductions on Bayshore, whether a business
district or high-injury designation matters,
and whether the City could lower limits only
at the Baylands frontage or along all
Bayshore in Brisbane.

Staff Team Staff Team confirmed safety-based authority for high-injury network segments and said all Bayshore within Brisbane is on the City's high-injury network. Engineering changes should accompany lower speed limits; Council could consider either geographic scope, while Baylands-specific mitigation focuses on the project frontage.

Frank Kern Asked whether approving the Bayshore
Mobility Plan without the road diet would in
effect approve only a concept requiring
subsequent redesign and approvals.

Staff Team Yes. The plan is conceptual even with the road diet; the City would need further engineering design, evaluation, and implementation decisions to determine specific corridor features.

Cliff Lentz Asked whether Baylands-related intersection and streetscape mitigation costs fall to the
developer and when transportation
improvement impact fees would be
collected.

Staff Team The developer is responsible for mitigation directly attributable to its project and fair-share contributions to the City transportation impact-fee program. Fees are ordinarily collected at building permits, with certain residential deferrals to certificate of occupancy and timing varying by use.

Public Comments
Speaker Comment / Question Response By Response
Paul Beschal Questioned why coordination with San
Francisco on Geneva Avenue, Schlage Lock
and related water/fire infrastructure had not
been pursued earlier, referring to prior
Council discussions.

Cliff Lentz Council Member Lentz disputed Beschal's characterization of his earlier position. The timing of coordination with San Francisco was not discussed further.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 48 of 102 ends

Speaker Comment / Question Response By Response
Paul Beschal Suggested speed cameras and lower posted
limits based on observed traffic-calming
effects along Geneva Avenue; questioned
whether narrow Bayshore sections between
Guadalupe Canyon Parkway and Valley
Drive can safely accommodate sidewalks
and separate bikeways without costly
retaining walls, and suggested a west-side
sidewalk/dedicated bikeway transitioning to
shared space where constrained.

Comment noted.

Charles Spencer Asked how the cumulative Candlestick,
Visitacion Valley and Baylands
development, with or without the Bayshore
road diet, could affect Brisbane's retail base,
social infrastructure and community identity;
said he had not heard a discussion of those
broader community effects.

No response was provided at the hearing.

Christina F. Criticized the Mobility Plan for failing to illustrate how the road diet and corridor
changes would work, despite projected
added Baylands traffic. Argued that signs
alone do not control speeding and that the
plan inadequately explains related Tunnel
Road/Sierra Point Parkway changes.

Comment noted.

Christina F. Questioned whether BDI's lack of
maintenance of Tunnel Road indicates
insufficient readiness for substantial future
soil-movement and construction traffic.

No response was provided at the hearing.

Michele Salmon Opposed a Bayshore road diet given
existing narrow lanes, large trucks, regional
commercial traffic, Guadalupe Canyon
Parkway trips, and anticipated soil hauling;
feared reduced capacity and safety for
Brisbane residents.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 49 of 102 ends

Speaker Comment / Question Response By Response
Michele Salmon Described uncovered quarry-haul trucks and uncontrolled dust during earlier work, said
she contacted police, Caltrans and the
county, and requested enforcement of truck-covering and dust controls during imminent quarry hauling.

Comment noted.

Linda Salmon Expressed concern about pedestrian and
bicycle safety within future Baylands streets
and said she did not understand whether
prior hearing questions on that street design
had been resolved.

Comment noted.

Linda Salmon Warned that soil-haul trucks, including any using Bayshore instead of rough Tunnel
Avenue, would create unsafe interactions
with existing traffic and petroleum trucks.

Comment noted.

Geneva Avenue Extension
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Asked whether the EIR assessed traffic on
existing Bayshore and Highway 101 access
if Geneva Avenue Extension is not built
while approximately 2,200 Brisbane
Baylands homes and 1,700 San Francisco-side homes are developed. Repeated that his question sought the no-extension
impact/mitigation analysis.

Staff Team Staff Team discussed the ability to separate road-diet proposals from Baylands-specific Bayshore safety mitigations. Staff Team explained that the identified Geneva Avenue bridge trigger relates primarily to fire-response access when more than about 50% of Phase 1 is developed. A traffic impact analysis for a no-extension scenario was not presented at the hearing.

Cliff Lentz Asked whether substantial Brisbane and
San Francisco housing and commercial
development could occur without any
Geneva Avenue Extension if the Phase 1
50% trigger is not reached, and expressed
concern about the resulting traffic.

Staff Team Staff Team agreed that the general interpretation was correct, while saying he would locate the exact EIR trigger. The bridge is linked to fire-station/emergency-response needs when about 50% of the Phase 1 program has been built, not an immediate requirement for the stated earlier development quantities.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 50 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz Requested the prior Geneva Avenue
Extension/US 101 connection renderings,
asked that they be displayed, and
questioned how vehicles would enter and
leave the interchange and connect east-west
to the east Baylands.

BDI, Staff Team The applicant said drawings had been sent to City staff; Staff Team confirmed receipt. Staff arranged to display the files during the hearing. The displayed image was conceptual and did not show a final roadway and interchange connectivity design.

Frank Kern Asked the date and status of the Geneva
Avenue/US 101 overcrossing rendering
shown during the hearing.

Not recorded The rendering was a conceptual Alternative 2 overcrossing drawing prepared in 2008; it was not presented as a current engineered plan.

Public Comments
Speaker Comment / Question Response By Response
Mary Rogers Urged construction of the Geneva Avenue
overpass before other development in light
of cumulative Baylands, Candlestick and
quarry-related traffic; cited traffic, emissions
and emergency-access benefits. Considered
a road-diet-free Mobility Plan acceptable in
concept but suggested using it as leverage
to prioritize the overpass.

Comment noted.

Interface with Regional Transportation Network
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Reported a meeting with Congressman
Mullin about bringing Brisbane, San
Francisco, transit agencies and other
regional partners together on the Geneva
Avenue Extension and highway connections.

Frank Kern /
Coleen Mackin
Council Member Kern described the Congressman as receptive to facilitating stakeholder discussions but emphasized no commitment had been made. The Mayor described potential regional coordination as a positive discussion, not an approved or funded project.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 51 of 102 ends

Council Member Comment / Question Response By Response
Coleen Mackin Reported that the Geneva Avenue
Extension/US 101 interchange should be
considered for CCAG's pending list of
regional transportation priorities submitted to
MTC, with an end-of-year deadline; warned
missing it could delay consideration for the
next five-year cycle.

Comment noted.

Madison Davis Suggested engaging state elected
representatives to encourage Caltrain
cooperation on cross-track soil conveyance.

BDI BDI welcomed support and advocacy from the City and state representatives; no particular meeting, commitment or agency approval was confirmed.

Public Comments
Speaker Comment / Question Response By Response
Christina F. Urged direct discussions with San Francisco in evaluating traffic and cross-border effects
near the city boundary.

Comment noted.

Site Grading, Soil Testing and Clean Soil Design
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Terry O'Connell Requested additional testing of stockpiled fill as it moves from the east landfill side to
western cap areas, potentially for
radioactivity and other contaminants.

Expressed concern that earlier samples
focused on hand-selected newer piles, and
asked to write additional testing into the
Specific Plan or grading requirements.

BDI In the following discussion, BDI said testing of imported/exported stockpiles is required by Measure JJ, performed using City brownfield grant funds, reviewed by EKI and regulators. 1.9 million cubic yards of post-2010 soil were sampled; approximately 1.8 million were determined suitable for fill/caps. Deeper material not yet tested would be sampled before it is moved. No decision to add the specific mid-transfer testing requested by Council Member O'Connell was made.

Cliff Lentz Requested more readable grading/elevation
visuals at the next meeting showing the
successive stages of western-side grading
and how raised development areas relate to
the existing Caltrain tracks and adjoining
grades.

BDI BDI agreed to bring back grading visuals and displayed existing diagrams and soil-testing information during the current hearing. The detailed staged visualization is to be provided at a later hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 52 of 102 ends

Council Member Comment / Question Response By Response
Frank Kern Asked whether the tested red soil layer
shown on the grading cross-section was
about ten feet thick and how the boundary
between that layer and older untested
material was established.

BDI The diagram used vertical exaggeration; depth of the newer soil varies across the site, roughly five, ten or twenty feet in different places. The boundary was established using aerial topographic surveys before and after the newer soil was placed.

Madison Davis Asked whether a conveyor across the
electrified Caltrain corridor remains feasible,
given concerns about overhead lines and
the requirement for Caltrain approval.

Staff Team The conveyor was not removed from EIR air-quality mitigation and remains a preferred possible option, but the definitive haul/construction plan has not been developed. Other cross-track options include controlled at-grade crossings. The EIR also analyzed on-street hauling as a conservative fallback if preferable alternatives cannot be implemented; discussions with Caltrain remain necessary.

Madison Davis Asked who determines whether soil
transport options are feasible when cross-track conveyor/Caltrain constraints, traffic impacts on Brisbane roads, and
funding/timing of the Geneva extension
present conflicting considerations.

Staff Team The agency with authority over an option determines whether it will permit that work, e.g. Caltrain controls infrastructure over its tracks.

Multiple options remain under evaluation, including a controlled crossing. Staff Team emphasized that the modeled intensive truck-hauling period is a conservative impact-analysis scenario, not a guaranteed construction schedule; actual phasing could distribute truck trips over a longer period.

Coleen Mackin Asked whether an under-track culvert or
small mining-style cart/conveyance system
had been evaluated as a long-term way to
transfer fill without a conventional truck
tunnel or heavy street hauling.

Staff Team, BDI Staff Team said below-track movement was among the options being examined; the plan/EIR prefer crossing Caltrain above, at or below grade before reverting to street trucks, and the City could require evidence that options had been exhausted. BDI later confirmed discussions about an under-track conveyor; a design, cost estimate or approval for small carts has not been completed.

Coleen Mackin Expressed safety concerns about using
large volumes of soil trucks at a Caltrain at-grade crossing, given the railroad's existing accident and grade-crossing issues.

Comment noted.

Madison Davis Asked for the status of Caltrain discussions and whether the applicant had made a
formal conveyor proposal or application to
Caltrain or the California Public Utilities
Commission.

BDI The applicant has not submitted a formal application. BDI reported five to six years of conversations with Caltrain about going over, under or across the railway; overhead electrification makes over-track solutions difficult, and under-track conveyor ideas have been discussed. Any needed Caltrain agreement remains outstanding.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 53 of 102 ends

Council Member Comment / Question Response By Response
Frank Kern Asked how failure of a drainage
geocomposite in a landfill cap would be
detected if the component's suggested
useful life could range from 30 to 100 years.

Asked what corrective action would be taken
if the cap's drainage geocomposite stopped
worStaff Team .

Staff Team Staff Team deferred to the landfill-design specialist. Fallon explained that a buried product avoids solar degradation and that lifespans depend on the material selected. The sloped cap itself redirects infiltration, so changes in water flow could be an indicator; he considered major failure unlikely. Fallon said the geocomposite is supplemental to the sloped, low-permeability cap and groundwater movement: performance might become less optimal but would not necessarily cease. A specific repair or replacement procedure was not discussed.

Cliff Lentz Asked whether Council approval of the
Specific Plan would ultimately allow hauling
soil by public streets if an over-, under- or at-grade agreement with Caltrain cannot be achieved.

Staff Team Yes. Using public streets would be the last-choice transport method if more direct cross-track approaches cannot be implemented.

Cliff Lentz Asked whether, if all alternatives are
infeasible, Brisbane would have to accept
extensive community disruption from street
hauling as a consequence of approving the
project.

Staff Team Staff Team said the mitigation measures seek to reduce impacts to the greatest feasible extent, but approval may leave impacts that cannot be mitigated. Staff Team explained that a future construction management plan could establish haul hours, school/commute peak avoidance, specific routes, complaint hotline, public monitoring, street cleaning, developer-funded roadway repairs and emergency-services review. The EIR route drawing was a concept, not a final approved haul plan.

Terry O'Connell Briefly asked whether a helicopter could be required as another hauling alternative; no
substantive response was provided.

No response was provided at the hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 54 of 102 ends

Public Comments
Speaker Comment / Question Response By Response
Chris Evers Expressed support for moving the Baylands
project forward, but questioned the apparent
removal of the electric soil conveyor as a
mitigation option between EIR versions,
continued inconsistent references to that
conveyor, reliance on trucks and traffic-management systems, effects on Tunnel Avenue bridge, emergency access and air
quality, and a proposed haul route using
Blanken Avenue where large trucks may be
prohibited. Requested an explanation of the
mitigation and routing discrepancies.

Comment noted.

Robin Leiter Asked for a clear map of exactly where
excavated soil leaves and reenters the site
and questioned proposed use of
Blanken/Tunnel streets in San Francisco
that may prohibit the relevant heavy trucks.

No response was provided at the hearing.

Robin Leiter Detailed potential congestion from hundreds of heavy soil-haul trucks at Tunnel Avenue
bridge, Bayshore, Lagoon Road, Tank Farm
access, Golden State Lumber, Old County
Road and freeway approaches; asked how
truck queues, traffic signals, business
access and emergency evacuation and
response could be managed given limited
shoulders and turning space.

No response was provided at the hearing.

Robin Leiter Raised concerns about dust on unpaved
haul routes, exposure at the fire station and
to nearby pedestrians/cyclists, and the
adequacy of a future construction-management plan to overcome physical roadway constraints. Asked that the
developer demonstrate a safe, feasible haul
route before approval and said she would
submit a list of concerns to the City Clerk.

No response was provided at the hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 55 of 102 ends

Speaker Comment / Question Response By Response
Emmett
Cunningham
Argued that transporting 2.5–2.9 million
cubic yards by heavy dump trucks could
cause very large, nonlinear road damage,
increased damage with wet soil, repeated
costly repairs and schedule uncertainty, as
well as diesel-cost exposure. Urged
requiring a conveyor instead and, if trucks
are permitted, requiring developer-funded
roadway resurfacing whenever the City
manager or engineer determines it is
necessary.

Comment noted.

Linda Salmon Questioned whether soil currently stockpiled over the contaminated landfill can genuinely
qualify as clean material for caps or fill.

No response was provided at the hearing.

Michele Salmon Raised concern that soil-testing data gaps remain along Bayshore and around the
former Lazari Fuel location, including areas
with former buildings, and questioned
whether those potentially contaminated
areas have been investigated.

Comment noted.

Michele Salmon Raised concern that invasive jubata/pampas grass and its seeds have infested the
stockpiled soil and Baylands, and that
moving fill could disperse seeds and
propagate a harmful invasive species. Asked
that this be addressed in site preparation,
noting she had raised it in draft EIR
comments.

No response was provided at the hearing.

Erin Becker Requested consideration of passive
radiation monitoring of soil haul trucks or
conveyor belts because of persistent
concerns about undocumented historic
shipments, potentially from Hunters Point,
and possible radioactive or mercury-containing wastes.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 56 of 102 ends

Speaker Comment / Question Response By Response
Paul Beschal Asked whether contaminated material
excavated from the west rail-yard side could
be placed in the former landfill on the east
side and then capped, rather than hauled to
distant permitted disposal facilities. Noted
concerns about long-term responsibility for
off-site waste, truck traffic and diesel
emissions, and asked whether regulations
had changed since this concept was
previously rejected.

No response was provided at the hearing.

Remediation Framework and Responsible Agencies
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Asked whether cities commonly impose
remediation or monitoring requirements
beyond DTSC/Regional Water Board
requirements, and how they avoid
duplicating or conflicting with the agencies'
regulatory oversight.

Water Board,
Staff Team
Water Board said local agencies usually coordinate requests and comments with the state/regional regulators to agree on a final oversight approach. Staff Team said Brisbane already uses EKI to review cleanup documents and advocate City concerns through the regulating agencies, and was unaware of a separate parallel City regulatory program. Staff Team described Brooklyn Basin methane review as ultimately handled by DTSC, not a separate City oversight layer. Council Member Davis characterized independent City requirements as unusually uncommon based on a prior advisory meeting.

Coleen Mackin Recounted DTSC webinar discussions
suggesting that additional monitoring
frequency might be requested under special
circumstances, potentially annually rather
than every five years, and said those
statements would need to be verified
because they were several years old.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 57 of 102 ends

Council Member Comment / Question Response By Response
Terry O'Connell Asked whether cleanup alternatives were chosen principally because capping is
cheaper than contaminant removal, and how
regulators weigh cost against best practice
and long-term safety.

Water Board,
Staff Team
Water Board said cost is one criterion among technical feasibility, CEQA/environmental effects, community and regulatory acceptance, and short-/long-term effectiveness; excavating all contaminants can create other risks, including truck impacts. Staff Team added that protection of human health and the environment is the threshold criterion; alternatives that fail it are rejected, independent of cost.

Terry O'Connell Asked whether housing on the two former rail-yard operable units can be safe and
compliant with Measure JJ at ground level,
rather than requiring residential podium
construction.

Water Board Ground-level or podium housing can be acceptable depending on site-specific tests showing no significant human-health/environmental exposure; the responsible regulators must review the testing and concur. Determinations would be made for each residential parcel based on site-specific testing.

Coleen Mackin Asked how far into the future methane and soil-gas monitoring will continue, including
whether there is an endpoint or monitoring in
perpetuity.

Staff Team Methane output from the mature landfill is expected to decline but monitoring may continue substantially longer than one year, depending on measured conditions. For the west-side volatile-organic-compound areas, later soil-gas sampling will determine whether mitigation is necessary; regulator-approved operations, maintenance and monitoring plans will establish sampling frequency and duration based on concentrations. A fixed end date for monitoring was not identified.

Coleen Mackin Asked whether chemicals, in addition to
decomposing landfill waste, release
hazardous vapors over time and whether
oxygen injection could accelerate gas
dissipation.

Staff Team Staff Team distinguished landfill methane from VOCs associated with west-side contamination; different compounds degrade under different aerobic/anaerobic conditions, so persistence is site-specific.

Regulatory monitoring would continue where needed. Staff Team added that DTSC cleanup of the off-site Schlage Lock source should help reduce VOC migration into OU-SM.

Cliff Lentz Asked when the excavation, stockpiling,
dust-control and stormwater procedures in
the Remedial Design Implementation Plans
(RDIPs) would be finalized, how they would
be evaluated, and how the public could
review or track compliance.

Staff Team Staff Team explained that the RDIPs include soil-vapor investigation, dust and other protective plans. She reported Water Board concurrence on OU-2 and comments with final DTSC approval still pending for OU-SM. During remediation, dust controls and perimeter air monitoring would be implemented. Staff Team added that subsequent operations and maintenance plans provide long-term monitoring/maintenance. A public-posting schedule for these documents was not discussed.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 58 of 102 ends

Council Member Comment / Question Response By Response
Coleen Mackin Asked what it means for monitoring to
continue until contaminant concentrations
fall below regulatory action levels, how the
results are tested, and who determines that
monitoring can end.

Staff Team Consultants take samples against the appropriate residential or commercial screening thresholds. Repeated sampling rounds may be required; consultants submit findings/recommendations, and the oversight agency makes the final decision, potentially requiring further quarters of sampling before approving a reduction in monitoring.

Coleen Mackin Asked who checks whether clean soil caps
remain intact, including beneath buildings
and after settlement or earthquakes;
whether checks occur annually even without
a major event; and how long those
obligations continue.

Staff Team An environmental consulting firm would generally conduct detailed annual cap inspections, plus additional inspections after major earthquakes or similar events; state agencies may conduct less-detailed site visits. Repairs that penetrate caps must use soil-management protections and restore cap integrity. Staff Team stated annual cap inspections are in perpetuity, while 30 years is used for cost estimates.

Public Comments
Speaker Comment / Question Response By Response
Paul Jimenez Supported moving the Baylands project
ahead with safe and responsible
remediation; stressed that qualified,
apprenticeship-trained workers who
understand hazards and public safety should
perform the work.

Comment noted.

Linda Salmon Requested that any project permits or
agreements apply only to the current owner
and not transfer with sale of the property,
citing concerns that future owners could
abandon prior understandings. Expressed
broader concern that the project is unsafe
and that remediation has not begun.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 59 of 102 ends

Speaker Comment / Question Response By Response
Ignacio Dayrit From the Center for Creative Land
Recycling, described the remedial-design
approach as typical of regulated brownfield
redevelopment, drawing on Emeryville
projects and the DTSC grant-supported
investigation. Emphasized that the large site
and multi-decade schedule require agency
oversight, transparent dust/air monitoring,
institutional controls and implementation
plans; supported continuing through the
established process.

Comment noted.

Janet Naito As a former DTSC manager and Center for
Creative Land Recycling representative,
supported use of established phased-investigation, cleanup, monitoring and risk-management procedures for the Baylands, citing Mission Bay and Sherwin-Williams
redevelopment and the need for
dust/community-air safeguards during each
phase.

Comment noted.

Allie Saberman SpeaStaff Team for the Housing Action
Coalition, supported regulated brownfield
redevelopment as an opportunity for
housing, parks and economic activity while
avoiding sprawl and greenhouse gas
emissions; cited Mission Bay as an example
and urged moving the Baylands through
established environmental oversight.

Comment noted.

Erin Becker Questioned the long-term integrity of the
landfill cap, noting that moisture, soil gases,
sea-level rise and roots from landscaped
trees may affect its performance; asked for
protection against contamination reaching
future residents.

No response was provided at the hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 60 of 102 ends

Speaker Comment / Question Response By Response
Erin Becker Cited a perceived inconsistency between a
30-year minimum landfill-cover maintenance
term and an EIR statement that certain
maintenance might be anticipated for only
one year because waste disposal stopped in
1967; requested durable, transparent
monitoring and enforcement of cap,
vegetation and leachate-control protections.

Comment noted.

Christina F. Noted reports from a Baylands advisory
meeting that contamination at the adjacent
San Francisco Schlage Lock site continues
to migrate into Brisbane Baylands
groundwater, and urged caution despite that
neighboring project's 2015 development
agreement.

Comment noted.

Paul Beschal Cited ground squirrels as a potential threat to long-term landfill caps and shallow vapor
barriers, based on Sierra Point experience;
requested study of burrowing-animal
controls for Baylands protections.

Comment noted.

Michele Salmon Cited a Mountain View office building vapor-intrusion incident and asked whether Baylands buildings will be monitored and
protected from VOCs/TCE even if building
ventilation configurations change, including
nonresidential buildings and formerly
contaminated industrial areas.

Staff Team Staff Team distinguished the cited building's history and said that, after fill placement and grading on the Baylands non-landfill area, VOC soil-gas sampling would occur. Where concentrations exceed residential screening levels, residential vapor mitigation would be required; commercial buildings would use commercial standards. She confirmed the planned procedures are addressed in the RDIP.

Monitoring frequencies for future buildings were not discussed in detail.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 61 of 102 ends

Phasing / Specific Plan Chapter 9
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Asked for the specific remediation and Title 27 landfill closure schedule required by
Measure JJ, beyond broad development
dates, and whether Council could require
that schedule in the Specific Plan.

Staff Team The landfill's ten-year closure period begins after the stockpiled soil is removed, correcting the timing in the staff report as Jeremiah Robbins stated earlier in the hearing. Other remedial work is anticipated in phases tied to development. Council can direct added phasing/scheduling requirements in the Specific Plan; a detailed sitewide schedule was not presented at the hearing.

Public Comments
Speaker Comment / Question Response By Response
Linda Salmon Questioned whether the longstanding
property owner intends or is capable of
actually beginning remediation and
development after decades of inactivity, and
voiced concern that the work could be
deferred indefinitely.

No response was provided at the hearing.

General / Procedural
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Coleen Mackin Asked why staff proposed Thursday dates
for the continued public hearings; noted that
Thursdays conflict with her county meetings
and requested consideration of
Monday/Tuesday dates and coordination
with Council schedules.

Staff Team Thursday dates reflected room and calendar availability and the objective of spacing hearings about a week apart, not a substantive preference. Staff would recheck Monday/Tuesday dates, confer with Angel and Council schedules, and return with a revised proposal.

Madison Davis Asked whether the imminent next hearing
would be October 20 or the proposed
October 22, noting conflicts with October 22
and 29.

Coleen Mackin The Mayor proposed retaining October 20 as the next hearing date and revisiting later hearing dates. The meeting was ultimately continued to October 20 at 5:30 p.m.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 62 of 102 ends

Council Member Comment / Question Response By Response
Frank Kern Asked whether staff would present a revised
hearing schedule at the October 20 meeting.

Staff Team Staff would endeavor to work with Angel to develop and present another scheduling proposal at that hearing.

Public Comments
Speaker Comment / Question Response By Response
Emmett
Cunningham
Favored EIR Alternative 3 over Alternative 7,
emphasizing its additional housing and
offices and anticipated long-term tax
revenues; acknowledged wider development
distribution, pile-driving inconvenience and
travel-related greenhouse gases but argued
these are outweighed by fiscal benefits and
may diminish with electric-vehicle adoption.

Comment noted.

Michele Salmon Urged adherence to all Measure JJ
commitments and avoidance of harm to
existing and future Brisbane residents;
emphasized writing a clear energy-neutral
requirement into the Specific Plan and cited
quarry truck-oversight failures as an
example of potential enforcement problems.

Comment noted.

Nels Delander Supported building the Baylands for needed housing accessible to construction workers;
urged use of responsible general contractors
and highly qualified, safety-trained
tradespeople for the project.

Comment noted.

Linda Salmon Raised concerns about wetland protection
and the lack of outreach to neighboring
Bayshore residents about effects on families
and children.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 63 of 102 ends

Hearing 5: October 20, 2026
Overview of Measure JJ / General Plan Requirements
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Asked whether adoption of the Specific Plan itself grants the property owner development
entitlements or allows a developer to file
specific development or permit applications.

Staff Team Adoption creates the regulatory framework for applications such as subdivision maps, design review and conditional use permits, but is a legislative action, not an entitlement to immediate building permits.

Later projects still require individual approvals and substantial infrastructure.

Cliff Lentz Asked whether a development agreement
must be executed before a developer may
submit permit applications after Specific
Plan adoption.

Staff Team Once the Specific Plan is in place, an applicant can apply for permits; a development agreement is not necessarily a prerequisite to submitting an application.

Coleen Mackin Asked whether the City could amend an
adopted Specific Plan before or after a
development agreement and whether later
amendments could affect approved
development rights.

Staff Team The Council can amend its legislative Specific Plan. Changes causing new or more severe effects may require further CEQA review. A development agreement can vest selected standards, so whether later amendments apply depends on its negotiated provisions and any other vested rights; without those rights the amended plan may apply.

Coleen Mackin Asked whether amendment of an adopted
Specific Plan would involve Planning
Commission public hearings and Council
action.

Staff Team Yes. Planning Commission recommendation and final City Council action are required through the process applicable to amending planning regulations.

Frank Kern Asked for an approximate start-to-finish
timeline to amend the Specific Plan after
adoption, including notice and Council
approvals.

Staff Team Staff Team said timing depends on complexity and staff preparation; changes to intensity or uses require 20-day Planning Commission notice and 10-day City Council notice. Zutler noted two readings and a 30-day effective period for zoning-ordinance amendments, while Staff Team clarified that the Specific Plan itself would be adopted by resolution and does not require a second reading. Council Member Kern suggested roughly 90 days, but no firm duration was confirmed.

Terry O'Connell Asked whether the same Specific Plan
amendment process applies to both
upzoning and downzoning.

Staff Team Yes. Amendments may also address design standards, implementation procedures and other Specific Plan requirements without changing density.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 64 of 102 ends

Sustainability Measures of the Specific Plan
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Asked that the commissioned peer review of
the applicant-paid energy-demand study, or
any new study, consider the higher Tier 1
building standard referenced in the
sustainability framework rather than the Title
24 Part 6 baseline; evaluate how Measure
JJ energy neutrality could be achieved,
including on-site/off-site or grid
combinations; and compare the current plan
with Alternative 7.

Staff Team Staff Team clarified that the report being peer-reviewed by Ramboll estimates building-type energy demand and uses less stringent building assumptions, yielding a conservative, higher demand estimate. It does not determine whether the project is energy-neutral or identify changes to achieve that goal. Separate ESA/consultant work and EIR analysis examine energy and alternatives, which could be highlighted in a future alternatives discussion. Council Member Lentz reiterated the importance of Measure JJ energy neutrality.

Land Use Plan & Design Topics
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Frank Kern Asked what steps and approximate time
would be required if Council selected a
CEQA alternative (e.g., Alternative 3 or 7)
instead of the staff-recommended plan.

Staff Team Council may select an analyzed alternative that meets objectives and has EIR coverage, but staff would need to revise the not-yet-adopted Specific Plan program and standards to implement it. Staff Team would confer with staff and consultants before estimating the work, and agreed the effort is more likely to take months than weeks.

Madison Davis Requested that staff bring to the next
hearing an estimate of time needed to revise
the Specific Plan if Council chooses an EIR
alternative.

Staff Team Staff Team agreed to have the discussion with staff and consultants; no specific estimate or firm delivery commitment was stated.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 65 of 102 ends

Phasing / Specific Plan Chapter 9
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Terry O'Connell Asked when Tunnel Road would be
redesigned or upgraded given that east-side
remediation and development would follow
completion of the west side.

Staff Team A redesigned Tunnel Road would be built with east-side development; repairs and maintenance might occur while the west side is under construction.

Cliff Lentz Asked whether state-approved remediation
for OU-SM and OU-2 must be completed
and certified for the entire western side of
Caltrain before any west-side
development/construction permits can
proceed, as stated in the staff report.

Staff Team Staff confirmed that complete west-side remediation and regulatory certification are required before west-side development.

Frank Kern Asked whether completion of Roundhouse,
Ice House Hill and Sustainability District
infrastructure would require an additional ten
years beyond the first Bayshore District
phase, and which districts actually develop
together.

BDI The Sustainability District is a grouping of different uses rather than an independent later phase. Some elements, such as utility-scale battery storage and potentially water infrastructure, would be built with the roughly ten-year Bayshore phase; Roundhouse residential and Ice House Hill commercial could follow in tandem over approximately another ten years.

Madison Davis Asked if residents may move into west-side homes while landfill remediation continues
nearby, whether such sequencing is
common, and how airborne contaminants or
particulates would be prevented, monitored
and enforced in occupied areas.

Staff Team Staff Team said adjacent occupation during phased cleanup is not unusual; OU-SM/OU-2 RDIPs include perimeter air-monitoring plans to measure possible pollutant migration from active landfill-remediation areas toward occupied residential areas. A resident-specific enforcement and response protocol was not discussed.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 66 of 102 ends

Council Member Comment / Question Response By Response
Coleen Mackin /
Madison Davis /
Cliff Lentz
Noted detailed phasing requirements for
streets, pedestrian and micromobility
facilities, water, wastewater and drainage
had been removed between draft and
current Specific Plan versions; asked what
enforceable consequences exist if
infrastructure is not delivered when required.

Asked staff to confirm that draft enforceable
Specific Plan phasing language would be
brought back for Council review.

Said the current Specific Plan Table 9.2.1 on
phases and districts was much less detailed
than a prior draft and asked staff to display
the earlier removed phasing provisions on
screen at the next meeting so Council and
the public can assess a baseline for
enforceable sequencing changes.

Staff Team Staff Team said the current Specific Plan sets broad phasing provisions, with detailed relationships once intended for a development agreement. Because a concurrent agreement is not expected, staff recommends adding specific performance and timing standards to the Specific Plan before adoption, including triggers tying park/infrastructure deliveries to permits or occupancy. The Specific Plan is a regulatory document, not a contract. Staff will bring back draft language; specific penalties or stop-work provisions have not yet been drafted.

Confirmed that staff would bring back draft language.

Cliff Lentz Asked whether the Specific Plan, rather than an uncertain later development agreement,
could establish detailed deadlines and
dependencies for open space, roads,
infrastructure, remediation and landfill
closure relative to permits and certificates of
occupancy.

Staff Team Yes; Staff Team agreed this was the same phasing/performance-standard amendment staff had just recommended for the Specific Plan.

Frank Kern Flagged an apparent conflict between the
north-to-south sequence described by the
applicant and EIR Volume 1 project-description language saying site grading proceeds south to north.

Staff Team, BDI BDI said the south-to-north reference was likely an outdated typo from an earlier staging concept and affirmed the current plan is north to south. Staff Team explicitly said the mistake would be added to the EIR errata list.

Cliff Lentz Asked how BDI would ensure appropriately
skilled, certified personnel handle the
extensive excavation and contaminated-soil
remediation, and whether all workers must
pass apprenticeship or specialized safety
training.

BDI BDI said experienced remediation contractor Geosyntec typically engages subcontractors under training requirements and that personnel needing onsite access must receive hazardous-waste operations training, generally the 40-hour HAZWOPER certification; supervisory/qualified staff require additional training. Whether all workers would complete a trade apprenticeship was not specified.

Cliff Lentz Asked the status of a project labor
agreement (PLA) with construction trades
and whether a binding PLA already exists.

BDI BDI has a letter of intent dating to about 2005-2006 with building trades and carpenters, not a completed PLA. It calls for a PLA after a general contractor is engaged and before building permits are pulled.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 67 of 102 ends

Council Member Comment / Question Response By Response
Terry O'Connell Noted that an earlier phasing table still showed 2,200 housing units instead of the
range, and asked whether building mostly
homes in the first two phases could reach
the trigger for Geneva Avenue or other east-side infrastructure before a corresponding commercial buildout. Also requested the
precise wastewater infrastructure threshold
and whether a 50% trigger means total
development floor area or housing.

Staff Team Staff Team said a 50% completion benchmark was associated with the Geneva Avenue bridge and that west-side development is linked to west-side infrastructure, with east-side infrastructure later. He agreed to confirm the exact trigger and whether the percentage applies to homes or overall buildout, and to report back to Council Member O'Connell.

Site Grading, Soil Testing and Clean Soil Design
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Asked whether San Francisco had approved
or agreed to the conceptual soil-hauling
route through Blanken Avenue / Tunnel
Avenue and its streets.

Staff Team No haul route is being approved now. The EIR analyzed a conceptual worst-case truck route for air and noise impacts. A later construction management plan will prioritize moving soil internally across the Caltrain corridor, over, under or at grade; if no crossing is feasible, the City would consider a formal truck-haul route. Final route, truck counts and timing have not been established.

Madison Davis Said the proposed options for moving fill all appear dependent on other jurisdictions and
insufficiently demonstrated; the EIR worst-case scenario of roughly 600-plus round-trip trucks per day has alarmed residents. Asked
for a credible feasible fallback, with a
reasonable route even if trucks become a
third or fourth choice, before she could be
comfortable approving the Specific Plan.

BDI The applicant prefers conveyor/over-, under- or at-grade on-site movement and said hauling over public streets is not preferred.

Sondej said the EIR assumption of moving approximately 2.5 million cubic yards at once is highly unlikely and a first Bayshore phase might use about 22% of that volume; EIR mitigation includes air, noise and haul coordination measures. Detailed implementation remains for subsequent plans and interagency study.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 68 of 102 ends

Council Member Comment / Question Response By Response
Coleen Mackin Asked exactly where fill-haul trucks would enter and exit each side of the Baylands,
where drives or roads would be built, where
vehicles would queue and park, whether
they could use Tunnel, Beatty, Lagoon Road
or Highway 101, and how prohibited routes,
tarps, dust, oversight and enforcement
would be handled. Cited past Google-bus
route violations and inadequate applicant
cooperation, and said an unresolved haul
route made approval difficult.

Staff Team, BDI Staff Team had stated no formal route is currently selected; Sondej explained that later construction, soil, quality-assurance and dust plans would address logistics and compliance with agencies and the City. She stressed a preference against public-street trucks and said construction would be phased. Specific routes, staging details, enforcement responsibility and oversight funding were not identified at the hearing.

Coleen Mackin /
Cliff Lentz
Presented former Mayor Karen
Cunningham's idea for a ramp or conveyor
from the Schlage/BDI office-area parStaff
Team lot near North Tunnel Road into the
Baylands to keep soil movement on property
rather than Brisbane streets; asked whether
the alternative and historic railroad-tunnel
easement could be investigated.

Requested that the applicant discuss
whether the proposed parStaff Team -lot
ramp/conveyor route could supplement or
replace other soil-transfer approaches.

Staff Team, BDI Staff Team noted the more-than-100-year-old train tunnel under the parStaff Team lot would require consideration. Sondej welcomed exploring the option but said BDI leases, rather than owns, the parStaff Team lot and would need to consult the owner; feasibility and any Caltrain issues remain to be evaluated.

BDI said they prefer to avoid trucks on streets and is willing to examine the parStaff Team -lot option, but it leases that property and would need owner discussions and engineering/agency coordination.

Existing detailed management plans would be developed beyond the Specific Plan framework.

Frank Kern Supported examining the proposed Schlage
parStaff Team -lot ramp but asked whether
the Schlage building/property is historically
protected and should be considered in
evaluating the proposal.

Staff Team Staff confirmed that the property is historically protected; the proposed ramp has not yet been evaluated.

Madison Davis Suggested raising the Schlage parStaff
Team -lot ramp option in discussions with
Caltrain and asStaff Team the owner
whether the land could be purchased
instead of leased to accommodate sustained
hauling or a conveyor.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 69 of 102 ends

Council Member Comment / Question Response By Response
Madison Davis Asked who would verify compliance of
grading work with approved plans and
geotechnical requirements, what inspection
documentation the City would receive, and
which City departments would inspect.

Staff Team Grading would receive ongoing inspections through the building inspection process and by Public Works/building staff to check compliance with approved plans; a specific documentation or reporting package was not discussed.

Terry O'Connell Questioned how the City could finance
adequate inspections, remediation and
infrastructure oversight when the applicant
was described as nearly $7 million behind in
reimbursements; sought assurance the City
would not incur further multimillion-dollar
costs during active work, not just assurances
for future property associations.

BDI, Staff Team BDI described future property-owner environmental associations, insurance and bonds; she also acknowledged outstanding bills and said she would confer with her finance team. Zutler confirmed a City-BDI reimbursement agreement and a gap in payments under it. Staff Team described future subdivision improvement agreements, payment/performance bonds and permit/inspection fees. A payment schedule for the outstanding balance was not provided at the hearing.

Coleen Mackin Asked how "continuous" grading inspections would work in practice and invited former
City Manager Robin Leiter to describe
inspections, staff capacity and developer-funded oversight used for the Northeast Ridge development.

Robin Leiter Leiter said the developer maintained a deposit account, work would stop if deposits stopped, and full-time dedicated inspectors were hired at developer cost. She cautioned that the earlier program was not perfect, that some aspects could have been inspected more thoroughly, and that adequately qualified inspectors are essential.

Madison Davis Clarified whether the project inspectors
described by Leiter would be dedicated
consultants rather than regular City building
inspectors.

Robin Leiter Yes. The referenced inspectors were hired specifically for the development and inspection was their sole assignment.

Madison Davis Requested more realistic phased truck-hauling scenarios beyond the EIR's concentrated worst case, comparing
volumes and daily trips over periods such as
10, 15 and 20 years, including queuing and
emergency access under a truck-only
fallback. Said Council needs quantified
alternatives to understand the impact of
less-intense but longer-running haul
operations.

Staff Team, BDI Staff Team suggested first developing a construction-management framework addressing haul hours, volume and performance standards; parameters could eventually be incorporated into a development agreement, although work could start sooner. BDI said BKF already has district-by-district soil volumes (about 0.5 million cubic yards / 20-22% for the Bayshore phase), but had not analyzed the wider traffic ripple effects; she offered to provide phased soil volumes and corresponding estimated truckloads/timing to City staff, possibly by the next hearing. A multi-scenario traffic and queuing study and a delivery date were not confirmed at the hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 70 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz Asked how a daily truck limit, permissible
routes, bridge load/safety limits, emergency
access and City oversight could be
formulated as enforceable performance
standards to minimize impacts on any day
hauling occurs, without assuming an exact
multi-year buildout schedule.

Staff Team, BDI Staff Team said the Specific Plan currently lacks such daily-haul requirements but could include them. Staff Team said City performance parameters and a construction-management framework could address timing, hours and volumes, with possible later DA terms. BDI distinguished the phased soil-volume information BDI could provide from a separate set of enforceable street-hauling performance standards; preparation of those standards was not assigned at the hearing.

Terry O'Connell Argued that truck-hauling limits and
enforceable construction/grading regulations
belong in the Specific Plan or an ordinance
adopted before Specific Plan action, rather
than depending on a future development
agreement that might never be executed.

Comment noted.

Cliff Lentz Said haul-route health, safety and
environmental performance standards
should be in the Specific Plan, not deferred
to a development agreement principally
addressing negotiated amenities; wanted
that analysis during the public hearing
process.

BDI BDI indicated the applicant's offer concerned phased soil movement amounts, whereas rules governing street-truck movements would be a distinct next-stage performance-standard document. No final placement or standards were agreed.

Coleen Mackin Asked that phase-by-phase soil-hauling
information show anticipated trips per day,
staging/queuing locations, routes and
operating hours, ideally with a map or
presentation that would help Council
evaluate street impacts.

BDI BDI said it would send the phased data to staff and determine what could be brought back at the next meeting, while cautioning that detailed routes and staging remained conceptual at this stage.

Madison Davis Asked that truck hauling be analyzed and
presented in terms of the daily and total
truck-trip limits, the duration of hauling,
enforceable targets, and the tradeoff
between fewer trucks per day and years of
continuing traffic impacts.

BDI BDI said phased information could be assembled and supplied to City staff, potentially for presentation at the next meeting. Trip limits and a quantified impact comparison were not presented at the hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 71 of 102 ends

Council Member Comment / Question Response By Response
Madison Davis Requested specific Specific Plan language or other enforceable provisions setting truck
trip numbers/times, queuing and dispatch
controls, routes for emergency vehicles,
compliance monitoring, and consequences if
haul-trip limits are exceeded; asked that
these details be worked out as far as
feasible before approval.

No response was provided at the hearing.

Frank Kern Said Council should first identify what haul-related information it needs and then establish performance standards, rather
than prematurely prescribing the detailed
operational method or engineering
approach.

Comment noted.

Cliff Lentz Asked for understandable visualizations of
the grading phases, west-side final contours
and relative elevations from Bayshore
Boulevard, the Northeast Ridge, Caltrain
tracks and Tunnel Road, preferably showing
dirt and excavation without future buildings.

Staff Team, BDI Staff Team identified existing EIR Chapter 4.5 photo simulations, but they principally show buildings, not construction-phase soil elevations. Staff Team showed a cut/fill map and said engineering cross-sections could show rail, road and grade relationships; more illustrative renderings would need clearer Council specifications. BDI later said BDI could furnish cross-sections to staff, but BKF was not present; phased grading-only visuals were not available at the hearing.

Coleen Mackin Asked what height difference or slope would remain between the newly graded west side
and the Caltrain tracks, since existing
exhibits do not clearly show whether edges
are five, ten or twenty feet above the rail
line.

Staff Team, BDI Staff Team suggested sections could illustrate an area perhaps 8-12 feet above the frontage road and acknowledged a Specific Plan figure was not an accurate final elevation depiction. BDI described the cut/fill map as showing soil volume to add, not final contours; she said the northern area near the Caltrain Plaza is approximately at the rail grade while lower center areas need substantial fill. A complete cross-section was not available at the hearing.

Terry O'Connell Asked how a five-foot clean cap would be installed in areas that appear to remain near
track level, whether the graded site would be
steeply sloped, and what would happen to
soil excavated to create room for clean fill.

BDI Some areas would be cut down to place the five-foot cap rather than simply raised five feet. The cut/fill map depicts material quantities, not final topographic slopes; the site is like a shallow bowl, requiring up to roughly 20-25 feet of fill in low areas, while some edges are already near grade. Excavated material would be tested and reused onsite if appropriate; contaminated or unsuitable hotspots would be removed.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 72 of 102 ends

Council Member Comment / Question Response By Response
Coleen Mackin Asked whether all depths of historic
stockpiled soil on the landfill, including soil
below the tested upper layers and former
piles 60-75 feet high, had been sampled and
how excavation would distinguish tested
from untested material.

BDI BDI said soil-import business activity preceded modern testing, which was required on incoming material beginning around 2012. The more recent designated stockpiles, about two million cubic yards, had been sampled and evaluated, with regulatory approval of the soil import evaluation report; older underlying material was not sampled as fully.

The tested material is geotagged for excavation boundaries; if additional older material is needed it must be tested in the future.

Coleen Mackin Asked how soil delivered by truck was
actually sampled at the landfill entrance and
whether the historical testing verified loads
before their acceptance.

BDI BDI said soil was tested before acceptance, sometimes at the origin and sometimes at the gate, and suggested that technical consultants could explain the specific truck and gate sampling procedure.

Terry O'Connell Distinguished remediation-related
groundwater controls from the additional
need for a grading/drainage plan identifying
where rainfall and surface runoff will go after
grading, particularly during construction of
new housing.

Staff Team Staff Team explained that rainfall/surface runoff falls under construction stormwater management and a SWPPP, with Water Board Construction General Permit requirements and best management practices to control sediment and pollutants. This is separate from environmental remediation.

Coleen Mackin Asked how surface runoff from the hills and mountain would be managed or redirected
as individual phases are graded and built,
especially during wet periods, so
construction areas do not flood.

Staff Team Staff Team identified the construction Stormwater Pollution Prevention Plan and Water Board construction permit (for sites exceeding one-half acre) as the mechanism for runoff best practices; no project-specific rechanneling drawing or flow plan was presented.

Madison Davis Requested updated, scaled EIR-style visual renderings reflecting the staff-recommended
Specific Plan rather than the earlier
applicant plan, particularly modified tower
numbers, shapes and positions.

Staff Team Staff Team confirmed the displayed images represent the earlier 2025/pre-mitigation applicant plan, not the current staff version. Staff Team said updating them is possible if Council directs the environmental consultant, would take approximately a month, and could also include other alternatives if Council specifies which; no final authorization was recorded.

Madison Davis Asked whether the EIR photo simulations
were accurately to scale and included the
substantial west-side grading/fill beneath the
depicted buildings.

Staff Team Staff Team confirmed that the visual massing was to scale and initially thought grading was represented, but said this needed verification with the environmental consultants/BDI; the grade elevations shown in the images are to be verified.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 73 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz Asked specifically whether large retaining
walls would be needed and how finish-grade
elevations would transition from the high cut
along Bayshore north of Guadalupe Canyon
Parkway toward Caltrain and the
Roundhouse; stressed that building
renderings do not answer his grading-only
question.

BDI BDI said grading is intended to level the existing bowl and meet cap/flood requirements rather than fill to all existing Bayshore elevations. BDI estimated some Icehouse Hill-area fill at 20-25 feet, but said BKF engineers were not at the hearing and offered cross-sections to clarify; the need for retaining walls is to be clarified through the cross-sections.

Cliff Lentz Asked whether Tunnel Road would remain
available to the public during the phased
construction period, aside from possible
interruptions for improvements.

BDI BDI believed it would generally remain open, with possible closure during roadway upgrades, and identified no other reason to close it.

Coleen Mackin Asked how excavated soil would be kept
from blowing through windy Visitation Valley
and Brisbane, including on unattended
weekends or during unexpected high winds,
and who would apply water or covers to
large exposed areas.

BDI BDI said phased RDIPs have air and dust-control/monitoring requirements, including watering, covering loose soil and stopping work at specified wind velocities. She suggested soil could be stabilized before workers leave on Friday, noted it would not be 300- 400 acres disturbed at once, and referred to the RDIP protocols; weekend-response staffing and contingencies were not discussed in detail.

Coleen Mackin Asked whether nonpotable water would be
used for the large quantities of water
potentially needed for construction dust
suppression.

BDI Probably not. BDI expected to use the existing SFPUC water service on the rail-yard site during construction/remediation
Madison Davis /
Coleen Mackin
Asked whether the possibility of hauling soil
in rail cars on existing tracks had ever been
presented to Caltrain and rejected, and
whether it should be raised as part of
renewed discussions.

Asked whether rail cars could be loaded on
spurs on each side during the day and
moved across the Caltrain main line at night,
or whether another spur could be installed to
avoid conflicts with passenger trains over a
decades-long project.

Staff Team, BDI Staff Team deferred to BDI. BDI said BDI had asked Caltrain about putting material on the tracks, but Caltrain strongly rejected the idea because increased electrified passenger headways leave little capacity; she said limited Union Pacific freight movements appear to operate under a grandfathered arrangement. A formal written Caltrain determination on a specific rail-haul design was not referenced.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 74 of 102 ends

Council Member Comment / Question Response By Response
Terry O'Connell Pointed out that Union Pacific freight, including hazardous-materials and
aggregate loads, already uses the rail
corridor and suggested talStaff Team to
Union Pacific about whether an existing
freight arrangement could serve the
Baylands soil movement.

BDI BDI acknowledged the correction of the Union Pacific name and that the approach was worth considering, while cautioning that an active spur on one side still would not solve transfer across the main corridor.

Madison Davis Asked whether BDI could contract for soil haulage through Union Pacific's existing rail
rights instead of separately obtaining track
use from Caltrain.

Terry O'Connell,
BDI
Council Member O'Connell cited her familiarity with Union Pacific freight operations on the line as a possible opening. BDI welcomed the suggestion but noted that getting railcars or soil across to the other side remained a problem; no feasibility conclusion was reached.

Coleen Mackin Stated that rail spurs exist on both sides of the Caltrain corridor, including at Golden
State Lumber and another potentially
reactivatable spur, challenging the
suggestion that only one side has spur
infrastructure.

Comment noted.

Public Comments
Speaker Comment / Question Response By Response
Chris Evers Urged Council not to allow dirt-hauling trucks on City streets; said the applicant should
have engineered a practicable crossing
sooner, and criticized portraying an EIR
diagram through Blanken Avenue, where he
said trucks are prohibited, as a haul route
when no actual approved route exists.

Opposed approving an unworkable plan on
an assumption it could be fixed later.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 75 of 102 ends

Speaker Comment / Question Response By Response
Robin Leiter Argued that hauling approximately 2.2
million cubic yards over about 34 months
constitutes a major project activity whose
actual route and environmental impacts
must be described and evaluated under
CEQA before approval. Said the EIR's
illustrated worst-case route appeared to
have originated from applicant assumptions;
changing the route would require revising
and analyzing the project description rather
than deciding later.

Comment noted.

Michele Salmon Said learning that the EIR truck haul-route diagram was only conceptual aggravated
concerns that other EIR assumptions may
not match the actual Specific Plan;
questioned whether other project features
were similarly based on unimplemented or
unrealistic assumptions.

Comment noted.

Michele Salmon Said the stockpiled soil contains invasive jubata/pampas grass seeds that can survive
soil movement and spread through new
landscapes; asked for soil testing/control for
invasive species in addition to chemical
contaminants, citing past damage to the
coastline and San Bruno Mountain.

No response was provided at the hearing.

Michele Salmon Suggested a three-dimensional printed site model or architectural diorama to convey
grading/building heights and scale more
reliably than AI-generated views.

Comment noted.

Paul Beschal Suggested transporting soil in rail air-dump cars pulled by electric locomotives, using or
extending existing spur tracks rather than
extensive street trucStaff Team ; described
the approximate capacity of a 50-cubic-yard
car versus 20-cubic-yard road trucks and
urged a feasibility/cost assessment.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 76 of 102 ends

Speaker Comment / Question Response By Response
Paul Beschal Argued that project agreements allowing
mitigation "when feasible" demand an actual
determination of feasible soil-transfer
measures rather than automatically
defaulting to what may be the cheapest
trucStaff Team method.

Comment noted.

Robin Leiter Called for a quantitative, site-specific
fugitive-dust assessment of millions of cubic
yards of earth moving, including exposed
acreage, stockpile heights, truck
loading/unloading, unpaved-road traffic,
strong winds and needed dust-suppression
water. Argued the EIR reliance on standard
best practices does not demonstrate actual
emissions or public exposure for a windy
industrial-scale operation.

Comment noted.

Robin Leiter Requested independent developer-funded
inspectors with authority to enter the work
area, review haul records, order corrective
measures, stop work for violations and
publish monitoring results, rather than
leaving dust control and enforcement to
unspecified later plans.

Comment noted.

Michele Salmon Cited alleged Northeast Ridge construction defects and inadequate past City/developer
inspections as reasons for genuinely
independent inspectors with community-safety accountability and effective mitigation of dust and other hazards during the larger
Baylands project.

Comment noted.

Michele Salmon Recalled extensive fugitive dust and soil mound heights allegedly above past permit
limits on the Baylands, and said moving
historic soil piles raises additional concerns
about untested materials and invasive weed
seeds, including star thistle as well as jubata
grass; urged strong testing and mitigation.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 77 of 102 ends

Speaker Comment / Question Response By Response
Roland Lebrun Cited a recent incident when his passenger train reportedly stopped after construction
debris fell onto the Caltrain tracks and the
car filled with cement dust; offered to supply
the incident record and cautioned that any
construction crossing must address rail-passenger dust and debris exposure.

Comment noted.

Interface with Regional Transportation Network
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Asked whether BDI had contacted Caltrain
since the previous hearing to arrange
discussions about an on-site conveyor or
crossing, and requested an update rather
than leaving feasibility until after Specific
Plan approval.

BDI, Staff Team BDI described longstanding discussions but said the applicant was not meeting with Caltrain currently while the Specific Plan remained unsettled; BDI expects renewed detailed coordination when Council direction is clearer and invited joint conversations with the City.

Dennis said City staff had reached out to Caltrain government relations and was awaiting a reply on next steps.

Cliff Lentz Urged earlier joint outreach to Caltrain to learn its preferences for soil crossing
options, and said Council members could
work with elected representatives on the
Caltrain board.

BDI BDI welcomed City collaboration with BDI in discussions with Caltrain; no meeting or Caltrain position was confirmed.

Cliff Lentz Requested that Roland Lebrun email City
Council a link to the railroad-crossing or soil-movement example he cited.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 78 of 102 ends

Public Comments
Speaker Comment / Question Response By Response
Robin Leiter Proposed assessing the property owner's
ability to obtain a private rail crossing
because it reportedly owns land on both
sides and under the railroad easement,
citing provisions of California utility law and
case law. Urged formal
engineering/application to the CPUC and
Caltrain/JPB for a conveyor, overpass or
underpass and evidence of infeasibility
before declaring cross-track soil movement
impossible.

Comment noted.

Paul Beschal Questioned whether prior joint planning with San Francisco for the Caltrain station
western entrance and multimodal
connections, which he described as dating
from 2015 with a 2030 horizon, would lapse
or need to be redone; urged slower, more
careful coordination rather than rushing
decisions.

No response was provided at the hearing.

Roland Lebrun Offered examples for evaluating soil
movement across or on railroad tracks,
including Caltrain workers crossing an active
Union Pacific track during Guadalupe River
Bridge work and a separate rail soil-hauling
discussion near Santa Clara Station;
requested closer examination of precedents.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 79 of 102 ends

Remediation Framework and Responsible Agencies
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Cliff Lentz Asked how cleanup criteria differ for
commercial and residential uses, including
schools, child care, parks and other
sensitive uses, and whether residential and
commercial areas separated by Main Street
on the western rail yard would be treated
differently.

Staff Team, BDI Staff Team explained residential risk exposure assumptions are more protective than a typical 5-day-per-week commercial worker scenario, and residential screening levels also commonly apply to schools/child care. Hotspots may require use-specific excavation; the planned five-foot clean-soil cap otherwise interrupts exposure pathways across the west side. Staff Team described effectively uniform protection for ground-level residential and related uses; Staff Team qualified that site-specific hotspots still need characterization. BDI agreed the west-side cap is designed to protect both residential and commercial uses, without differing overall cap standards.

Terry O'Connell Compared the proposed Baylands rail-yard cleanup with the Schlage Lock site and
asked whether Schlage permits ground-level
residential use without a podium or vapor
restrictions.

BDI BDI said Schlage has two operating units: the northern area near offices does not require residential vapor mitigation, while the more contaminated southern area requires vapor mitigation systems below ground-level residential buildings. She distinguished that vapor-plume issue from the proposed Baylands five-foot clean-soil cover.

Coleen Mackin Asked why a groundwater-management plan
was not included in the Specific Plan before
approval, given phased grading and
construction and potential changes in water
flow throughout the site.

Staff Team Staff Team confirmed the groundwater plan is not part of the Specific Plan and is instead addressed through DTSC/Water Board-regulated RDIPs. Staff Team said procedures cover encountered groundwater and construction dewatering. Staff Team cited mitigation measure HAZ-1b requiring an agency-approved soil/groundwater management plan subject to City peer review before grading/building permits.

Council Member Mackin indicated she was also concerned with grading-related drainage, rather than remediation alone.

Coleen Mackin Raised a county/CCAG report identifying
PCB contamination and movement in
Brisbane stormwater/groundwater; asked
whether Baylands soils had been
investigated, whether the City's regional
PCB program covers the Baylands, and
whether monitoring would continue.

Staff Team Staff Team described the Bay Area Water Board's general PCB-source investigations. Staff Team said Brisbane reports and tests PCBs through a county regional stormwater program covering all areas inside City limits, including the Baylands, with additional requirements for larger construction sites; he offered PCB documents at a future meeting. Staff Teams aid specific Baylands PCB exceedances were identified in EIR hazard testing and are to be addressed in remediation, with ongoing system monitoring. A project-specific PCB sampling schedule was not discussed.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 80 of 102 ends

Public Comments
Speaker Comment / Question Response By Response
Michele Salmon Asked for more thorough soil testing of the former Lazari fuel-site location and along the
Bayshore and Highway 101 corridors,
including lead and other contaminants, and
questioned gaps shown in the testing
diagram.

No response was provided at the hearing.

Michele Salmon Raised concerns about historic VWR
industrial contamination, recounted
anecdotal reports of former workers with
cancer, and questioned whether the five-foot
clean cap sufficiently protects residents and
children if roots from trees and other plants
penetrate through to underlying
contaminants.

Comment noted.

Sea Level Rise
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Coleen Mackin Asked how phased fill design addresses
sea-level rise and 100-year flooding,
especially water potentially overtopping
Highway 101 and reaching the east side;
requested the actual projections being used,
noting uncertainty in evolving climate
forecasts.

BDI BDI said planned fill raises low western areas to meet flood elevations and that 100-year flood and sea-level-rise assumptions were incorporated into engineered final grades. She said the applicant could provide more technical explanation, described using what she believed was 2024 state/regional guidance and cited a 6.6- foot high sea-level-rise scenario. She said BDI cannot control Highway 101 flooding. Conditions if water overtops the roadway were not addressed further at the hearing.

Public Comments
Speaker Comment / Question Response By Response
Michele Salmon Expressed concern that approximately 6.6 feet of sea-level rise may occur sooner than
the end-of-century assumptions discussed
during the hearing.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 81 of 102 ends

General / Procedural
Council Member Questions and Comments
Baylands Specific Plan | City Council Hearing Comments and Responses

Page 82 of 102 ends

Council Member Comment / Question Response By Response
Baylands Specific Plan | City Council Hearing Comments and Responses

Page 83 of 102 ends

Frank Kern Council Member Kern suggested reserving a
contingency hearing date on December 7, 8,
or 9, before the December 10 Council
reorganization, in case further Baylands
hearings are necessary.

Council Member Davis supported the
proposed hearing schedule and Council
Member Kern's December contingency
placeholder, but noted the closely spaced
November 17 hearing and November 19
regular Council meeting; asked why the
second week of November was relatively
open.

Council Member Lentz questioned
scheduling the November 17 Baylands
hearing and November 19 regular Council
meeting so close together; suggested
moving the hearing to November 23 or
potentially canceling the November 19
meeting, preferring one intense meeting per
week so Council has time to study.

The Mayor asked whether short regular City
Council business could be handled
immediately before or after a Baylands
hearing so City operations are not effectively
suspended during the hearing series.

The Mayor opposed the proposed three
consecutive November 17-19 meetings and
the labeling of December meetings as
"deliberations" without a scheduled public
discussion of accumulated potential Specific
Plan changes. Asked who was compiling
unresolved hearing issues and sought a
December meeting to review possible
changes with public input.

Council Member Lentz suggested keeping
the hearing schedule open for additional
substantive sessions on EIR alternatives,
objective design standards with visual
renderings, and public safety, noting new
questions arise during hearings and the
project warrants sufficient review despite
schedule pressure.

Staff Team Veterans Day was identified as a complication in scheduling. Council Member Davis then noticed the November 9 date and said she could accept the schedule.

Staff was monitoring November meeting agendas to avoid
overloading Council, and Staff Team knew of no particular November 19 business that could not be moved; the regular meeting might potentially be canceled. No final rescheduling was announced.

Yes, for important consent items that do not require substantial Council discussion.

Dennis said staff intended "deliberations" to encompass robust Council discussion based on materials and errata brought back, and did not intend the proposed dates to end all meetings. Zutler later clarified that labeling a session "deliberations" or "discussion" does not itself determine whether public comments can continue. Council Member Mackin favored tentative Baylands placeholders rather than restrictive labels.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 84 of 102 ends

Council Member Comment / Question Response By Response
Council Member Mackin suggested using
the label "Tentative Baylands meeting" for
December placeholders rather than fixing
topics such as deliberations before Council
determines what additional discussions and
alternatives review are needed.

Cliff Lentz Asked whether Council must close the public hearing before discussing or deliberating
potential Specific Plan changes, and
whether it may keep receiving public input
while considering new information.

Staff Team No. Council can discuss comments and possible changes without closing the hearing; the label applied to the discussion does not control whether public input is permitted. Zutler noted a caveat that public comment cannot always be completely limited.

Frank Kern Asked why the State of the City event
mentioned in the schedule memo was not
posted on the City calendar less than a
month beforehand.

Not recorded The response stated that its absence from the calendar was intentional; no further reason was given.

Cliff Lentz Renewed his request for a letter or
agreement showing the property owner
authorized BDI to negotiate agreements and
contracts; asked when the document
previously discussed with the applicant
would be provided.

BDI After consulting counsel, BDI said the ownership/management agreement disclosure was not necessary during current zoning and Specific Plan proceedings, which concern City legislative documents.

She said she would share relevant authorization/management documents at the appropriate development-agreement negotiation stage, when BDI signing authority is relevant; no document was provided at this hearing.

Frank Kern Requested clearer public explanation of the
hearing sequence and the specific topic
being discussed at each meeting, citing
community feedback that the movement
through topics was difficult to follow.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 85 of 102 ends

Council Member Comment / Question Response By Response
Coleen Mackin Asked when Council would receive the
running table of significant issues and
possible Specific Plan changes raised at
earlier hearings, which Council needs to
review ahead of year-end discussions;
clarified that the request was for issue
summaries, not a verbatim transcript.

Asked whether staff was compiling hearing
comments, responses, unresolved issues
and potential Specific Plan revisions, and
requested early release of at least part of
that matrix ahead of December to allow
meaningful Council and public review.

Staff Team Staff Team said staff and consultants were updating both a table and transcripts and could provide the issue-summary table at the next hearing. Council Member O'Connell said her understanding was that staff had agreed to a high-level issue list, not verbatim transcripts.

Staff and consultants are tracking each comment in a matrix, including initial answers, information to return, changes directed and issues needing further Council direction. Staff Teams aid this informs change pages and a list of open items for further Council discussion, and staff would follow Council direction on earlier distribution.

Cliff Lentz Noted the City has spent substantial
unreimbursed staff and consultant time
preparing the Specific Plan and EIR,
questioned whether this meets Measure JJ's
fiscal-positive-by-phase requirement, and
asked how and when BDI would make the
City whole, including a payment schedule.

BDI BDI agreed to consult BDI's chief finance officer/controller and seek an answer and possible schedule for staff, expressing hope to provide it by the next hearing.

Coleen Mackin Requested that underlying technical studies and reports, including soil testing
attachments, be included as full documents
in City Council agenda packets instead of
supplied only as hyperlinks, so Council and
the public do not miss material evidence.

Staff Team Staff asked whether Council Member Mackin meant physically attaching the complete reports; she confirmed that was her request.

Coleen Mackin Asked whether the applicant's letters of
intent for a future PLA cover all building
trades or only particular unions.

BDI The original 2005-2006 LOI covered building trades including carpenters; because carpenters later separated from the Building Trades Council, BDI now has a separate, largely parallel LOI with the carpenters. A binding PLA has not yet been executed.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 86 of 102 ends

Public Comments
Speaker Comment / Question Response By Response
Linda Salmon In a statement read aloud by Michele
Salmon, demanded that the current
Baylands property owner begin reimbursing
approximately $7 million the City has
reportedly spent before further approvals;
linked the unpaid costs to concerns about
City finances and rising recreation
costs/reduced senior and children's benefits.

Comment noted.

Bart Pantoja SpeaStaff Team for the San Mateo County
Building Trades Council, supported eventual
Baylands development and stressed skilled
union construction workers,
workplace/environmental safety, workforce
standards, inclusive agreements,
apprenticeship pathways and construction
career opportunities; said the trades are
ready to perform remediation, utilities and
building work.

Comment noted.

Roland Lebrun Suggested City policy requiring prompt
posting of hearing transcripts at the same
time as meeting videos, rather than a week
later, to improve public and Council access;
offered to forward his own transcript and
described an intent to seek statewide
legislation.

Comment noted.

Nels Delander SpeaStaff Team for Carpenters Local 217,
supported the Baylands project for
construction jobs and economic opportunity;
said the carpenters supplied the Building
Trades Council an example of a successful
three-party PLA and were waiting for its
response, while remaining interested in
collaboration.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 87 of 102 ends

Hearing 6: October 26, 2026
General / Applicant Reimbursement
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Terry O'Connell Asked whether City staff considered BDI's letter and explanation for outstanding
consultant reimbursements reasonable, and
whether staff agreed with its characterization
of the dispute.

Staff Team The City did not agree with many characterizations in the letter; attorneys for the City and applicant were communicating about the outstanding amounts.

Cliff Lentz Asked BDI to confirm that BDI accepts the
reimbursement agreement and intends to
reimburse the City in full for costs incurred
preparing the Specific Plan and EIR;
expressed concern that months of
nonpayment are unacceptable and
requested a concrete payment plan and
timetable.

BDI BDI acknowledged the reimbursement agreement and said the applicant's finance team and attorneys were working with the City to reach a solution that makes everyone whole; a payment date was not provided at the hearing. Council requested a concrete reimbursement payment plan and timetable for the next hearing; applicant said it would follow up.

Terry O'Connell Asked whether BDI had received all
documents and invoices it requested, noting
that document requests had continued
throughout 2026 while the outstanding
invoices remained unresolved.

Staff Team Staff said it had transmitted materials to BDI on more than one occasion over approximately the preceding 18 months and had located and supplied additional documents in response to requests.

Coleen Mackin Expressed concern that the unpaid City
reimbursements undermine confidence in
the applicant's financial reliability on a
project of this scale; questioned whether BDI
could finance and complete remediation if it
begins work and later stops; urged the
parties to resolve the reimbursement issue
promptly.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 88 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz Stated that he wants the Specific Plan and
EIR approved, the site remediated, and
housing built, but believes BDI must first
address the City's outstanding
reimbursements with a credible payment
arrangement rather than allowing further
months to pass without payment.

Comment noted.

Coleen Mackin Asked when the City last received any
payment from BDI and sought clarification of
the current amount owed and whether the
balance had changed as additional costs
accrued.

Staff Team Staff discussed the payment history and outstanding balance, including that costs continued to accrue; a final agreed amount and payment schedule have not yet been established.

Madison Davis Asked for clarification of the reimbursement figures, including the difference between the
prior and current balances and an
approximately $800,000 change.

Staff Team Staff discussed the difference in the figures; no final resolution of the reimbursement dispute was announced.

General / Hearing Administration
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Supported the format of the new City
Council comment-and-response tracker
because it makes lengthy questions more
concise; identified a spelling correction for
Clark Conway's name.

Staff Team Staff acknowledged that names and other details in the tracker might require correction and welcomed Council feedback on the prototype.

Coleen Mackin Asked Council and staff to review the
proposed schedule for the remaining
Baylands hearings and whether the
upcoming meeting dates accommodated
Council members' commitments.

Staff Team Staff discussed the proposed hearing dates, including November 9, and noted that later meetings remained tentative depending on the topics still to be covered.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 89 of 102 ends

Phasing / Specific Plan Chapter 9
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Asked whether district-level remediation and infrastructure performance requirements
could be placed directly in the Specific Plan
rather than left to a future development
agreement, particularly if no development
agreement is ultimately approved.

Staff Team Staff described proposed district-based requirements and indicated that phasing and performance standards could be included in the Specific Plan before development, rather than relying solely on a later development agreement. Staff presented proposed district phasing requirements for potential incorporation in the Specific Plan; further refinement anticipated.

Cliff Lentz Asked for greater clarity on the timing and sequencing of remediation, grading, soil
movement, infrastructure and development
on the west and east sides, including how
those activities would be coordinated with
later occupancy.

Staff Team Staff discussed proposed district-level sequencing and performance requirements and explained that detailed implementation would be tied to subsequent development approvals and regulatory remediation milestones. Staff Team described the phasing framework as a draft and indicated a revised presentation would return.

Terry O'Connell Questioned how the Regional Water Board's approximately ten-year landfill-closure
timeline would be triggered if substantial
east-side soil movement must occur first;
asked what happens to roughly 4.5 to 5
million cubic yards of soil remaining on the
landfill during that period.

Staff Team, BDI The applicant described moving roughly 2 to 2.5 million cubic yards to the east side, with the remainder used on the landfill; staff said it would discuss the proposed sequencing and timing with the applicant and noted that east-side development can independently trigger cleanup obligations. Council Member O'Connell requested a Specific Plan trigger tied to the ten-year closure/remediation horizon and implications if not completed.

Cliff Lentz Followed up on the ten-year closure trigger and asked how the timing of east-side soil
movement and commencement of the
regulatory closure period would work in
practice.

Staff Team Staff Team said staff could discuss the intended sequence with the applicant; he distinguished the overall landfill-closure clock from remediation and closure work that would be required for specific east-side development areas in the interim.

Coleen Mackin Asked what the Specific Plan means when it says development in one part of a district
should not prematurely consume that
district's development capacity; asked how
development allocations across blocks and
the balance of residential and commercial
uses would be maintained.

Staff Team Staff Team explained that the district development allocations have some flexibility, but the intent is to prevent early projects from using capacity needed for other blocks and to maintain the planned distribution of development across districts.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 90 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz Pointed out an apparent inconsistency
between the previous staff report, which said
OU-SM and OU-2 remediation must be
certified complete before west-of-Caltrain
construction permits, and staff's current
explanation allowing remediation and
development by individual areas or blocks.

Staff Team Staff Team clarified that staff intended remediation and agency approval to occur for each development area before that area proceeds, not necessarily complete remediation of the entire west side before any development. He acknowledged the previous staff report could have conveyed a different understanding.

Cliff Lentz Asked whether Council could require
remediation of the entire west side before
residential occupancy, even if commercial
development were allowed earlier, rather
than permitting occupancy as individual
areas are remediated.

Staff Team Staff Team said the approach could raise feasibility concerns because it would require remediation of a very large area before allowing residential development to be occupied; no Council decision on that alternative was made.

Terry O'Connell Asked whether remediation certification applies to each block, such as A1, or to a
larger district, and expressed concern that
grading and developing one block while
adjoining blocks remain unremediated would
be impractical for streets and infrastructure;
preferred district-wide remediation before
buildings proceed.

Staff Team Staff Team said the intent was to be more granular than an entire district, with boundaries and details established through subsequent tentative maps and remediation plans. Council Member O'Connell maintained her concern about block-by-block implementation.

Public Comments
Speaker Comment / Question Response By Response
Michele Salmon Questioned whether regulators and sufficient funding will remain available throughout a
prolonged, phased cleanup; urged
remediation of an entire district before
residents occupy any part of it, citing
exposure, disruption, uncertainty, and
effects on residents and property values.

No response was provided at the hearing.

Paul Beschal Questioned whether the entire Baylands
should be planned as a single project rather
than focusing first on parcels and
development that are financially and
technically feasible; cited the potentially
prohibitive costs of site cleanup.

No response was provided at the hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 91 of 102 ends

Speaker Comment / Question Response By Response
Robin Leiter Requested additional time for public review of the phasing information and exhibits first
shown during the hearing before Council
makes decisions based on them.

Comment noted.

Emmett
Cunningham
Asked why project activities appear to
proceed serially rather than allowing more
remediation, infrastructure and development
workstreams to advance in parallel where
feasible.

No response was provided at the hearing.

Emmett
Cunningham
Questioned the significance of the 1,001st
housing unit as a project milestone
compared with the level of development
needed to support the Geneva Avenue
connection and other major infrastructure.

No response was provided at the hearing.

Michele Salmon Expressed concern that affordable housing concentrated in separate areas could isolate
lower-income residents; urged greater
integration of lower-income, moderate-income and market-rate housing across the project.

Comment noted.

Robin Leiter Asked whether regulatory financial
assurance bonds are a last-resort backstop
and whether assigning obligations to
homeowners first could make those
homeowners' funds liable before a
developer's bond; requested confirmation of
how priorities work.

No response was provided at the hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 92 of 102 ends

Land Use Restrictions and Enforcement
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Asked which long-term environmental
maintenance obligations remain with the
original developer, which attach to individual
parcels or future homeowners and
businesses, and which would be funded
through an association or environmental
management entity after parcels are sold.

Staff Team Staff distinguished regulatory cleanup obligations from continuing land-use covenants, monitoring and maintenance requirements.

Responsibilities and management arrangements depend on the final remedy, property interests and long-term environmental management structure; not all obligations automatically transfer to an individual homeowner.

Terry O'Connell Asked whether California's cradle-to-grave responsibility for hazardous materials ends
when regulators certify cleanup or whether
the original polluter or responsible party
remains liable afterward.

Staff Team The response distinguished continuing regulatory responsibility of identified responsible parties from property owners' routine maintenance obligations; Staff Team said a developer may remain a responsible party in the eyes of regulators even after remediation work and property transfers.

Coleen Mackin Asked under what circumstances an
engineered soil cap might be disturbed or
breached after remediation, including during
utility repairs, building alterations,
earthquake damage or other unforeseen
work.

Staff Team Staff Team explained that utilities are intended to be placed in clean corridors separated from contaminated soil by demarcation material, reducing routine disturbance; deeper excavations, slab modifications or damage repairs could still disturb caps and would require applicable controls.

Cliff Lentz Asked how future utilities and maintenance
crews will know exactly where clean utility
corridors end and contaminated soil or the
engineered cap begins, including whether
surveyed maps and adequate worStaff
Team widths will be available.

Staff Team Staff Team said the utility corridors would be surveyed and mapped, with demarcation fabric along their boundaries and bottoms and sufficient clean space around the pipes; the intention is to keep normal utility work within the clean corridors.

Madison Davis Asked who will inspect, operate and
maintain vapor intrusion mitigation systems
over the long term, how frequently they will
be monitored, and what happens if an active
system loses power for several days or a
week.

Staff Team Staff Team said engineered systems, including passive systems, require long-term operation, monitoring and maintenance plans, with frequency dependent on the system. She explained that screening levels reflect long-term exposure assumptions and that a short outage would not necessarily create the same risk as prolonged exposure.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 93 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz Asked for more detailed drainage mapping
showing how the proposed grading
elevations change water flows near adjacent
properties, including the tank farm, Golden
State Lumber, Recology and pumping
facilities. Asked how the master drainage
basin plan would relate to the Baylands
phasing approach and master infrastructure
system, and requested further discussion of
the relationship.

BDI, Staff Team The applicant said it believed a drainage map existed in the infrastructure materials and offered to bring it back; staff displayed an older drainage/sea-level-rise map but acknowledged that a more detailed exhibit might be needed.

Terry O'Connell Noted that a drainage exhibit appeared to direct water across Golden State Lumber
and asked whether the developer would
need to prevent runoff from being
discharged onto another owner's property.

Staff Team, BDI The response agreed that the developer would need to control drainage so that the project does not improperly direct runoff onto neighboring properties.

Madison Davis Asked staff and the applicant to reconcile two drainage exhibits that appeared to show
water flowing in different directions, one
toward the Bay and another toward adjoining
properties.

Staff Team, BDI The participants reviewed the exhibits and distinguished their different depictions; a final comprehensive drainage design has not yet been prepared.

Cliff Lentz Asked how contaminated soil excavated on
the west side would be managed, including
whether it would be reused on site or hauled
away and how dust, truck contamination and
trackout would be controlled.

Staff Team Staff Team said the remedial design implementation plans would establish dust controls, perimeter air monitoring, truck decontamination and trackout prevention; excavated material could be reconsolidated on site or disposed off site depending on its characteristics and the approved plans.

Coleen Mackin Asked whether the City's former tipping-fee ordinance or existing truck-hauling and
grading fees would apply to the substantial
soil movement anticipated for the project,
including soil moved within the site versus
on public roads.

Staff Team Public Works said current grading-permit and truck-hauling fees are assessed under the City's master fee schedule, including fees for existing interim uses, unless changed by an agreement. Staff Team distinguished those current fees from the historical landfill tipping fee and said the old ordinance's application would need further review.

Cliff Lentz Asked whether the former tipping fee was
limited to the period when the landfill
accepted waste or could also apply to later
soil-hauling activities.

Staff Team Staff Team said he did not have the details of the historical ordinance and would need to review its language before answering definitively.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 94 of 102 ends

Council Member Comment / Question Response By Response
Madison Davis Asked that the long-term land-use
restrictions, maintenance obligations, and
responses to Council questions be clearly
documented in the hearing record, including
who would carry obligations after property
transfers.

Staff Team Staff Team described layered obligations that would depend on remediation status, including responsibilities carried through homeowners associations and restrictions running with the land.

Public Comments
Speaker Comment / Question Response By Response
Linda Salmon Questioned how soil from the contaminated
Baylands could become material suitable for
a clean clay cap; expressed concern about
the composition, durability and long-term
safety of caps and the uncertainty of who
would be liable if they fail.

No response was provided at the hearing.

Michele Salmon Questioned how more than one million cubic yards of soil would be accommodated in the
Ice House Hill District and whether
contaminated material would be fully
characterized and managed before
movement.

No response was provided at the hearing.

Michele Salmon Cited perceived enforcement failures at
Northeast Ridge, including subsequent
homeowner modifications and HOA
approvals inconsistent with original
restrictions, and questioned whether similar
covenants, development agreements and
oversight would be reliable at the Baylands.

Comment noted.

Paul Beschal Raised concerns about the Kinder Morgan
pipeline and the risk of corrosion, soil
movement or other damage, and asked
whether utility-corridor assumptions
adequately address existing pipelines and
infrastructure.

No response was provided at the hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 95 of 102 ends

Speaker Comment / Question Response By Response
Paul Beschal Asked why some contaminated soil could be
left beneath roads or hardscape on the rail-side property while other material could not be consolidated on the old landfill and
capped, rather than being hauled off site.

No response was provided at the hearing.

Robin Leiter Questioned whether long-term
environmental maintenance and potential
emergency repairs would be backed by an
escrow or comparable dedicated reserve so
that money remains available when needed.

No response was provided at the hearing.

Susan Brandon Expressed concern that the proposed soil-hauling route and approximately 640 truck trips could create queuing, idling, difficult
turns and emergency-access impacts;
requested a traffic microsimulation and
resolution of safety issues before deferring
them to later plans.

Comment noted.

Clara Johnson Questioned whether the proposed five-foot clean-soil cap is sufficiently protective and
why a deeper cap was not selected;
requested indoor monitoring where vapor
intrusion is present, in addition to mitigation
systems and ongoing groundwater and
cover monitoring.

No response was provided at the hearing.

Clara Johnson Urged that critical remediation, phasing and transportation issues be resolved in the
Specific Plan rather than deferred;
questioned whether alternatives and the
feasibility of the truck-haul route had been
adequately explored and suggested
additional attention to rail-based soil
movement.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 96 of 102 ends

Speaker Comment / Question Response By Response
Linda Salmon Questioned the long-term implications of
families and children living above capped
contaminated soil for decades, and whether
annual inspections and other monitoring
would detect leakage or cap deterioration
soon enough.

No response was provided at the hearing.

Emmett
Cunningham
Suggested examining alternative methods
for moving soil across the Caltrain corridor,
including whether a conveyor or other
crossing below the tracks could reduce
reliance on truck hauling.

Comment noted.

City Liability and Financial Risk
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Asked what happens if major repairs to a
landfill cap or remediation system become
necessary decades from now and the
responsible entity lacks funds, and what
legal or financial mechanisms ensure the
work is completed.

Staff Team Staff Team said regulatory agencies require financial assurance mechanisms for long-term remedy obligations and that ongoing monitoring would identify needed repairs; the long-term management organization, supported by financial assurances, is intended to fund anticipated work.

Cliff Lentz Asked how the funding amount for
monitoring and maintaining the cap in
perpetuity is calculated, whether an
established model exists, and whether
funds, bonds, insurance or an investment
reserve would be used.

Staff Team Staff Team described DTSC guidance for estimating reasonably anticipated long-term costs, commonly using a 30-year present-value calculation. She said permitted assurance mechanisms can include bonds or set-aside funds and are worked out with the regulatory agencies.

Cliff Lentz Asked whether the City Council could
require a post-remediation security deposit
before vesting of development rights, as
additional protection against future
remediation or maintenance costs.

Staff Team Staff Team explained that vested rights may arise through a development agreement, vesting tentative map or valid permit and substantial reliance, depending on circumstances; the appropriate mechanism and timing would require consideration within the applicable approval process.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 97 of 102 ends

Council Member Comment / Question Response By Response
Terry O'Connell Asked whether long-term remediation and monitoring costs would be paid through HOA
dues or by the entity that financed the
original cleanup, and whether a sitewide
environmental management organization
would be responsible.

Staff Team, BDI Staff Team described the concept of a Baylands-wide environmental management association; the exact funding and allocation of responsibilities were not finalized. The applicant cited Sierra Point's environmental management association, funded by property-owner dues, as a potential model.

Terry O'Connell Asked whether a later developer could be prevented from receiving permits because
an unrelated earlier developer had not
satisfied its remediation or financial
assurance obligations.

Staff Team Staff Team said the effect depends on how the site and phases are regulated; later developers may need to address the risk through acquisition negotiations, assurances or step-in rights and may wait until prior-phase obligations are complete.

Madison Davis Asked which financial instruments would be required for landfill-cap maintenance, landfill
gas controls, groundwater monitoring and
other remedies, who determines the amount,
and whether estimates are updated for
inflation, changing site conditions or actual
repair costs.

Staff Team Staff Team said regulators typically require an estimated 30-year cost of operation, maintenance and monitoring before approving financial assurances. Whether those estimates are periodically adjusted for inflation was not confirmed at the hearing.

Terry O'Connell Asked whether the City could condition
subsequent building permits or occupancy
on evidence that required financial
assurances, regulatory reporting and
maintenance arrangements are in place and
current.

Staff Team Staff Team said the Specific Plan could clarify that regulatory compliance and reporting must be documented to the City and that failure to complete required remediation or monitoring steps could prevent further development permits.

Coleen Mackin Asked whether phased construction could
redirect runoff onto existing businesses or
leave drainage unmanaged if work pauses
for years; asked whether BDI had formally
consulted Golden State Lumber, Kinder
Morgan, Recology and other adjoining
property owners about grading and
stormwater plans.

BDI, Staff Team BDI said there had not been formal meetings to review the plans with adjacent owners, although the applicant maintained relationships with them. She said construction stormwater management plans would address runoff and be reviewed with permits; Staff Team noted approved plans must be supplied to the City and regulatory oversight continues during construction pauses.

Coleen Mackin Asked whether the City would receive and
review stormwater management plans for
individual grading and building phases,
rather than relying on general conceptual
drainage exhibits.

BDI, Staff Team The applicant said the City would review plans when specific grading or building permits are sought; Staff Team added that mitigation measures require evidence of approved stormwater plans before construction permits and copies to the City.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 98 of 102 ends

Council Member Comment / Question Response By Response
Madison Davis Asked whether there is any circumstance in which the City might have to pay for
remediation repairs or assume site
responsibility if the responsible party or
property owners cannot afford the work.

Staff Team Staff Team said the proposed structure is intended to keep ownership and remediation responsibilities on private property and with responsible parties, rather than give the City a direct obligation to perform or finance repairs.

Madison Davis Asked whether recommendations from the
environmental oversight group could protect
the City through its existing authority without
inadvertently maStaff Team the City
responsible for environmental cleanup
decisions that belong to regulatory agencies.

Staff Team Staff Team said the regulatory agencies should determine cleanup sufficiency and financial assurances. He supported giving the City access to regulatory reports, allowing it to review and comment, and using City permit authority when required cleanup milestones have not been satisfied, without assuming primary regulatory responsibility.

Cliff Lentz Suggested requiring a reserve or fund that
accumulates over time to pay for significant
future environmental repairs, rather than
relying on an HOA that may lack sufficient
resources when repairs are needed.

Staff Team Staff Team said he could follow up with staff on a recommendation.

Public Comments
Speaker Comment / Question Response By Response
Linda Salmon Questioned BDI's financial reliability given unpaid City reimbursements and the
potential for future cost escalation; feared
that the City or residents could ultimately be
burdened with cleanup and maintenance
costs if the developer cannot perform.

No response was provided at the hearing.

Michele Salmon Asked whether the City would ultimately be responsible for maintaining dedicated streets
and infrastructure if they fail, as at Northeast
Ridge, and whether specialized fire
equipment and services for tall buildings
would impose additional City costs.

No response was provided at the hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 99 of 102 ends

Speaker Comment / Question Response By Response
Michele Salmon Expressed concern about the length of the planning process and perceived
inconsistencies between the applicant's
Specific Plan and environmental review
documents; urged that the development be
made safe and financially sustainable before
proceeding.

Comment noted.

Paul Beschal Asked whether dedication of approximately
25 percent of the site as public open space
could expose the City to liability for
contaminated land, damaged caps or
ongoing environmental maintenance.

No response was provided at the hearing.

Paul Beschal Questioned the absence of a public works
corporation yard and funding strategy to
support maintenance of the Baylands over
time, compared with proposed police and
fire facilities.

No response was provided at the hearing.

Paul Beschal Raised concerns that insufficient
coordination with San Francisco and
delayed regional transportation connections,
including connections to US 101 and transit
stations, could leave Brisbane with traffic
and infrastructure burdens during early
phases.

Comment noted.

Emmett
Cunningham
Asked what financial protections would
prevent the City from inheriting an unfinished
project if the master developer or a later
developer runs out of money partway
through construction.

No response was provided at the hearing.

Emmett
Cunningham
Asked who would bear the costs of
catastrophic failures, as distinct from
predictable routine maintenance, and
whether financial assurances account for
such events.

No response was provided at the hearing.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 100 of 102 ends

Speaker Comment / Question Response By Response
Emmett
Cunningham
Raised concern about rockfall from Ice
House Hill along a proposed roadway and
asked whether a protective wall or barrier
would be needed.

No response was provided at the hearing.

Emmett
Cunningham
Asked whether Caltrain had been consulted
on drainage and water flowing toward its
right-of-way, and whether the project would
protect rail infrastructure from grading-related runoff changes.

No response was provided at the hearing.

Charles Spencer Asked where the public can obtain the
signed reimbursement agreement between
BDI and the City to review its provisions.

No response was provided at the hearing.

Charles Spencer Asked which City funds have been used to cover Baylands-related costs while BDI's
reimbursement payments remain overdue.

No response was provided at the hearing.

Charles Spencer Asked whether the reimbursement
agreement authorizes legal action or
suspension of negotiations or project
processing if BDI fails to pay amounts due.

No response was provided at the hearing.

Robin Leiter Requested grading cross-sections, not just plan-view maps, showing existing and
proposed elevations, excavation, fill and
transitions to the adjacent tank farm, pump
station, Kinder Morgan and Golden State
Lumber properties.

Comment noted.

Susan Brandon Said the applicant should consult adjacent owners about changes to grading and
drainage before fixing initial building-pad,
road and storm-drain elevations; warned that
poorly coordinated gravity drainage could
force expensive pumping solutions later.

Comment noted.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 101 of 102 ends

Speaker Comment / Question Response By Response
Susan Brandon Asked for examples of comparable large
projects completed by the developer to help
Council assess its capacity to carry out the
proposed development and associated
responsibilities.

No response was provided at the hearing.

Clara Johnson Expressed concern that future homeowners
could face large environmental maintenance
liabilities without a dedicated protective fund,
and questioned whether the City could face
litigation if owners cannot meet those costs.

Comment noted.

Clara Johnson Suggested that cleanup and financial
assurance decisions remain principally with
the responsible regulatory agencies rather
than the City, which may not have the
resources to manage obligations extending
many decades.

Comment noted.

Phasing and Remediation
Council Member Questions and Comments
Council Member Comment / Question Response By Response
Madison Davis Asked that the proposed phasing diagrams
identify approximate dwelling-unit counts by
development block so Council can evaluate
how the distribution of units relates to
infrastructure and open-space timing.

Staff Team Staff Team directed Council to the Specific Plan table with approximate units by block. Staff Team indicated the unit counts could be added to the diagrams.

Terry O'Connell Requested that the Specific Plan include a clear remediation timing trigger linked to the
Water Board closure period and that staff
explain the consequences if remediation is
not completed within the applicable period.

Staff Team Staff Team explained that the ten-year period relates to removal of the stockpile rather than running automatically from Specific Plan approval; he said the Specific Plan could potentially mirror the relevant timing horizon.

Baylands Specific Plan | City Council Hearing Comments and Responses

Page 102 of 102 ends

Council Member Comment / Question Response By Response
Cliff Lentz Asked for a clearer visual showing the
proposed final grades without illustrative
landscaping or buildings so Council can
understand how the site will drain and how
proposed grades may affect existing
residents and neighboring properties.

BDI BDI indicated that drainage information might be available in the infrastructure plans and would follow up.

Cliff Lentz Asked where the Caltrain right-of-way or
easement boundary lies relative to the
proposed frontage road and grading work,
including whether soil excavation would
occur immediately adjacent to Caltrain
property.

BDI BDI said the easement varies by location and that she would need to get back to Council about the boundary.

From: Earthhelp <[email protected]>
Sent: Saturday, October 31, 2026 7:01 PM
To: Padilla, Ingrid <[email protected]>
Subject: Trick or Treat
Videos about Millineum Towers
For the Public Record re: Baylands Project
Thinking out loud…..
952 likes, 151 comments. "San Francisco’s
$13M Penthouses Are Leani...

Collapsing Estates
youtube.com
1K likes, 147 comments. "San Francisco’s
Luxury Tower Flooded From ...

Falling Mansions
youtube.com

← All documents from this meeting